Sydney – Ivanhoe & Albury (SIA)Config 14 & NSW Super Possession
Stage 1 - Chullora Jctn to Enfield WestStage 2 - Enfield West to GlenleeStage 3 - Glenlee to Berrima JctnStage 4 - Berrima Jctn to Moss ValeStage 5 - Moss Vale to GoulburnStage 6 - Goulburn to Yass JctnStage 7 - Yass Jctn to JuneeStage 8 - Junee to AlburyStage 9 - Cootamundra to StockinbingalStage10 - Stockinbingal to Goobang Jctn
Stage 1 – 3, 2230hrs Friday 4th Sept – 0200 Monday 7th SeptStage 4, 0400hrs Saturday 4th Sept – 0200 Monday 7th SeptStage 5, 2230hrs Friday 4th Sept – 0200 Monday 7th SeptStage 6 -10, 0600hrs Saturday 5th Sept – 180hrs Monday 7th Sept
2
CONTENTS
• Possession Contacts• COVID–19 Declaration• Train Alteration Advice• ARTC Network Rules &
Procedures• PPE Requirements• Drug & Alcohol• Communication• Safety• Environmental Management
4
POSSESSIONCONTACTS
MOSS VALE - ALBURY Position Shift Name Phone number
Possession Manager (PM) 0600 - 1800 Warren Williams 0438 672 296
Logistics Coordinator 0600 - 1800 Deane Thrower 0477 385 470
Possession Administrator (PA) 0600 - 1800 Michael Gordon 0428 562 906
Work as Executed [email protected]
NSW Super Possession PPO’s Moss Vale - AlburyPPO (Day) Stage 4,5,6 0600 - 1800 Paul Mangion 0428 341 167
PPO (Night) Stage 4,5,6 1800 - 0600 Tony Bush 0458 092 124
PPO (Day) Stage 7 0600 - 1800 Chris Sternbaur 0497 621 507
PPO (Night) Stage 7 1800 - 0600 Stephen Boyle 0408 864 565
PPO (Day) Stage 8,9,10 0600 - 1800 Craig Diesel 0401 272 818
PPO (Night) Stage 8,9,10 1800 - 0600 Barry Llewellyn 0428 592 661
5
COVID-19DECLARATION
2020 NSW Super Possession COVID-19 Declaration Record
ARTC has implemented a COVID-19 declaration form to help manage the safety of our communities, staff and contractors during the current pandemic. The measures that have been implemented is based on advice by the NSW Government website.
All personnel participating in the Config 14 & NSW Super Possession must complete the declaration prior to coming to site, and answer each question truthfully to the best of their ability.
When completing the declaration please take note the information at the top of the page and action the requirements accordingly.
You can scan the QR Code below using the camera on your phone to access the declaration. Alternatively your Project Manager (PM) should have forwarded a link, if you have not received, or cannot access via the QR Code please contact your relevant PM.
6
ARTC NETWORK RULES &
PROCESURES
ARTC NSW Network Rules & ProceduresAs part of the SIA Corridor’s Possession Teams effort to continue driving a positive safety culture for all personnel working within our possessions, we have included links via QR Codes to the NSW Network Rules and Procedures.
As with the COVID-19 declaration, you can use the camera on your phone to scan the code and you will be taken to the relevant section of the ARTC website containing the Rules and Procedures.
It is important for ALL personnel to understand the requirements to work within the corridor, and regularly check for updates to the rules and procedures.
We have included some of the relevant rules and procedures related the Config 14 & NSW Super Possession below and highly recommend you review these documents prior to the possession.
General Rules• ANGE 218 - Type F Level Crossing Management
Work on Track• ANWT 302 - Local Possession Authority• ANWT 314 - Work Trains• ANWT 316 - Track Vehicles
Procedures• ANPR 700 - Using a Local Possession Authority• ANPR 704 - Using Infrastructure Booking Advices• ANPR 710 - Piloting Trains and Track Vehicles
7
ARTC NETWORK RULES &
PROCEDURESQR CODE LINKS
ARTC NSW Network Rules & Procedures
Glossary
General Rules
Work on Track
Procedures
8
PPE REQUIREMENTS • Reflective stripes are only required at night or when there is poor light conditions or reduced visibility. Reflective vests or shirts must be available in case work extends and conditions deteriorate
• Hard hats must be worn at all times in the shared corridor• Hard hats are to be worn on a risk assessed basis, or when mandated by the
Safe Work Method Statement (SWMS)
• Safety glasses are to be worn at all times (Must meet AS/NZS 1337.1:2010)• Ear protection is to be carried and worn as required, unless mandated by the
Safe Work Method Statement (SWMS)
• Gloves are to be carried at all times, and worn as required unless mandated by the Safe Working Method Statement
• Ankle length steel / carbon fiber capped boots that are fit for purpose must be worn at all times.
• Boots must have laces, but can have zippered side. Correct fit should be checked each morning before commencing work
9
DRUGS AND ALCOHOL
• A positive drug and/or alcohol test or other breach of policy, procedure or relevant law may result in disciplinary action which may include termination of employment or contract / service and/or suspension of a worker’s rail industry worker card.
• The refusal to supply or undertake testing, is considered a positive result
• What if a worker has been prescribed or is taking medication?
• Prescription and over the counter medicine (including herbal medicine or product) may affect a worker’s ability to work safely.
• Workers must explain to their doctor, pharmacist or other practitioner the nature of their work and seek advice as to the possible effects of the medicine. Workers should ask for medication that will not affect their ability to work safely or show up as a Positive Drug Test where this is available.
• If a worker needs to take medication that may affect their ability to work safely and/or show up as a Positive Drug Test, they must declare the medication and it’s drug class(es) to their ARTC Manager and must not work contrary to any medical advice or instructions.
• ARTC may require a worker to sign a medical release to allow the Chief Medical Officer to consult with their medical practitioner.
10
FATIGUE MANAGEMENT WHAT IS FATIGUE?
Fatigue is more than feeling tired and drowsy. In a work context, fatigue is a state of mental and/or physical exhaustion that reduces a person’s ability to perform work safely and effectively. It can occur because of prolonged or intense mental or physical activity, sleep loss and/or disruption of the internal body clock.
Signs of fatigue include:
• Tiredness even after sleep • Reduced hand-eye coordination or slow reflexes • Short term memory problems and an inability to concentrate • Blurred vision or impaired visual perception • A need for extended sleep during days off work.
WHAT CAUSES FATIGUE?
Fatigue can be caused by work related or non-work related factors or a combination of both. Work related causes of fatigue include excessively long shifts, not enough time to recover between shifts and blocks of shifts, very strenuous jobs and long commuting times. An example of non-work related fatigue would be poor quality sleep due to street noise or family demands.
11
ENVIRONMENTALSOIL AND WATER CONTAMINATION
It is important for staff to plan work to avoid known contamination (particularly when excavating soils) and minimise the potential to cause contamination of soil and water. Indicators of soil and water contamination include soil staining, discoloration, smell/odours, unusual texture and oily sheens.
Planning your work Identify likely presence of contamination through site inspection, ARTC database search,
local knowledge and environmental assessment (such as REF or TBEIA). If soil or water contamination is identified seek advice from your Environmental Officer. A
specialist consultant may be required to undertake testing or help manage the site. Review the fuels, oils, chemicals or maintenance activities proposed for the project, and
ensure appropriate containment measures (e.g. contained areas, bunded fuel tanks or drip trays) and spill kits are available to capture and manage spills that may occur.
What should I do? If contamination has been identified try to avoid the area and if necessary erect signage or
fencing to delineate ‘no go zones’. If contaminated soils cannot be avoided follow advice from your Environmental Officer and
where available consultancy reports / management plan. Soil material cannot be taken outside the rail corridor without contamination testing and
having gained the correct waste transport / disposal approvals. Contaminated material is to be stockpiled separately so that it is not mixed with non-
contaminated material. Consideration to be given to covering the contaminated stockpile and / or using sandbags
to bund the area and contain the material.
12
ENVIRONMENTALSTOCKPILES
Stockpiles are often associated with construction and maintenance activities and can be in place for the short or long term. Poorly managed stockpiles can lead to issues such as erosion, vegetation removal, visual impacts and dusty sites. ARTC may receive complaints from the EPA or community if a stockpile is poorly managed.
Planning your work The following should be considered when establishing a stockpile site: Place the stockpile on flat ground rather than a slope; Locate the stockpile away from drainage lines or creeks where there is concentrated water flow
or potential for erosion; Place away from residential areas and in locations where views of surrounding environments
will not be blocked; Select locations that have previously been used for stockpiling or which are disturbed; Access to the stockpile site and associated impacts from truck and vehicle movements; and Where stockpiles are long term, consider other spoil management options such as offsite
disposal or reuse.
13
ENVIRONMENTALSTOCKPILES CONT…
What should I do? Define or delineate the stockpile area to prevent stockpiles from ‘creeping’ to other areas. Do not stockpile under tree drip lines or within tree root zones as this can damage trees. Store site topsoil separately so it can be put back and assist in revegetating the site. If contaminated soil is stockpiled on site, keep in a separate location away from other soil to
prevent cross contamination, cover and clearly delineate on maps or by way of signage or fencing.
Use sediment controls such as sand bags, sediment fence, a ballast mound or covers to minimise sediment run off.
Limit stockpile height to 2 meters as this limits the potential for dust and visual impacts. Monitor and review stockpiles after rain events, strong winds and manage in accordance with
environmental assessment (where relevant). If dust is observed from the stockpile consider using a water cart to suppress the dust. For long
term stockpiles consider using more permanent covers such as vegetation, tarpaulins or a binding agent.
14
POSSESSION REPORTING
As part of the possession, the Possession Management Team are required to issue at the end of each shift to ARTC management a report showing the below details, A nominated ARTC representative will call all sites between 16:30 – 18:00 hrs. each day for the required details;
1. Number of staff onsite and hours worked2. Production for the day3. Issues4. TSR’s
All Work as Executed information is required to be submitted within 24 hours of project completion, this includes but is not limited to certification forms.
Please send to [email protected] and use the phrase ‘Work as Executed’ in the email subject.
NOTE: If your job finishes prior to 1630 hrs. it is the responsibility of the site supervisor to call the Possession
Admin and advise of the project status
NSW Super Shut
Possession Stage Area Day
PositionNight
Position Times Hours Shift Name Location Contact Dates
PPO Stage 4,5,6 Moss Vale - Yass Junction PO4 21:00 Friday - 06:00 Saturday 9 NIGHT Tony Bush Goulburn PC 0458 092 124
Stage 4,5,6 Moss Vale - Yass Junction PO4 18:00 Saturday - 06:00 Sunday 12 NIGHT Tony Bush Goulburn PC 0458 092 124
Stage 4,5,6 Moss Vale - Yass Junction PO4 18:00 Sunday - 06:00 Monday 12 NIGHT Tony Bush Goulburn PC 0458 092 124
PPO ASSIST Stage 4,5,6 Moss Vale - Yass Junction 21:00 Friday - 06:00 Saturday 9 NIGHT Richard Luckas Goulburn PC 0428 592 860
Stage 4,5,6 Moss Vale - Yass Junction 18:00 Saturday - 06:00 Sunday 12 NIGHT Richard Luckas Goulburn PC 0428 592 860
Stage 4,5,6 Moss Vale - Yass Junction 18:00 Sunday - 06:00 Monday 12 NIGHT Richard Luckas Goulburn PC 0428 592 860
PPO Stage 4,5,6 Moss Vale - Yass Junction PO4 06:00 Saturday - 18:00 Saturday 12 DAY Paul Mangion Goulburn PC 0428 341 167
Stage 4,5,6 Moss Vale - Yass Junction PO4 06:00 Sunday - 18:00 Sunday 12 DAY Paul Mangion Goulburn PC 0428 341 167
Stage 4,5,6 Moss Vale - Yass Junction PO4 06:00 Monday - 18:00 Monday 12 DAY Paul Mangion Goulburn PC 0428 341 167
PPO ASSIST Stage 4,5,6 Moss Vale - Yass Junction 06:00 Saturday - 18:00 Saturday 12 DAY Mark Brown Goulburn PC 0413 007 863
Stage 4,5,6 Moss Vale - Yass Junction 06:00 Sunday - 18:00 Sunday 12 DAY Mark Brown Goulburn PC 0413 007 863
Stage 4,5,6 Moss Vale - Yass Junction 06:00 Monday - 18:00 Monday 12 DAY Mark Brown Goulburn PC 0413 007 863
PPO Stage 7 Yass Junction - Junee PO4 06:00 Saturday - 18:00 Saturday 12 DAY Chris Sternbauer Cootamundra PC 0497 621 507
Stage 7 Yass Junction - Junee PO4 06:00 Sunday - 18:00 Sunday 12 DAY Chris Sternbauer Cootamundra PC 0497 621 507
Stage 7 Yass Junction - Junee PO4 06:00 Monday - 18:00 Monday 12 DAY Chris Sternbauer Cootamundra PC 0497 621 507
PPO ASSIST Stage 7 Yass Junction - Junee 06:00 Saturday - 18:00 Saturday 12 DAY Michael Bereyne Cootamundra PC 0417 292 745
Stage 7 Yass Junction - Junee 06:00 Sunday - 18:00 Sunday 12 DAY Michael Bereyne Cootamundra PC 0418 292 745
Stage 7 Yass Junction - Junee 06:00 Monday - 18:00 Monday 12 DAY Michael Bereyne Cootamundra PC 0419 292 745
PPO Stage 7 Yass Junction - Junee PO4 18:00 Saturday - 06:00 Sunday 12 NIGHT Stephen Boyle Cootamundra PC 0408 864 565
Stage 7 Yass Junction - Junee PO4 18:00 Sunday - 06:00 Monday 12 NIGHT Stephen Boyle Cootamundra PC 0409 864 565
PPO ASSIST Stage 7 Yass Junction - Junee 18:00 Saturday - 06:00 Sunday 12 NIGHT Mellissa Mendeyk Cootamundra PC 0432 745 734
Stage 7 Yass Junction - Junee 18:00 Sunday - 06:00 Monday 12 NIGHT Mellissa Mendeyk Cootamundra PC 0433 745 734
PPO Stage 8,9,10 Junee - Albury & Parkes PO4 06:00 Saturday - 18:00 Saturday 12 DAY Craig Diesel Cootamundra PC 0401 272 818
Stage 8,9,10 Junee - Albury & Parkes PO4 06:00 Sunday - 18:00 Sunday 12 DAY Craig Diesel Cootamundra PC 0401 272 818
Stage 8,9,10 Junee - Albury & Parkes PO4 06:00 Monday - 18:00 Monday 12 DAY Craig Diesel Cootamundra PC 0401 272 818
PPO ASSIST Stage 8,9,10 Junee - Albury & Parkes 06:00 Saturday - 18:00 Saturday 12 DAY Michael O'donnell Cootamundra PC 0416 996 229
Stage 8,9,10 Junee - Albury & Parkes 06:00 Sunday - 18:00 Sunday 12 DAY Michael O'donnell Cootamundra PC 0416 996 229
Stage 8,9,10 Junee - Albury & Parkes 06:00 Monday - 18:00 Monday 12 DAY Matthew Robinson Cootamundra PC 0416 996 229
PPO Stage 8,9,10 Junee - Albury & Parkes PO4 18:00 Saturday - 06:00 Sunday 12 NIGHT Barry Llewellyn Cootamundra PC 0428 592 661
Stage 8,9,10 Junee - Albury & Parkes PO4 18:00 Sunday - 06:00 Monday 12 NIGHT Barry Llewellyn Cootamundra PC 0428 592 661
PPO ASSIST Stage 8,9,10 Junee - Albury & Parkes 18:00 Saturday - 06:00 Sunday 12 NIGHT Mark Walsh Cootamundra PC 0418 438 813
Stage 8,9,10 Junee - Albury & Parkes 18:00 Sunday - 06:00 Monday 12 NIGHT Mark Walsh Cootamundra PC 0418 438 813
2020 NSW SUPER POSSESSION PPO ROSTER
Friday 4th September Saturday 5th September , Sunday 6th September Monday 7th September
2020
Amendment 1 TAA 1057- 2020 Issued 02 September 2020 (JH) Page 1 of 14
TRAIN ALTERATION ADVICE No: 1057 – 2020 Amendment 1
Interstate Network
Sydney – Ivanhoe – Albury Corridor
Sydney to Albury & Cootamundra to Goobang Junction Closedown
Sydney Trains WE10 Possession Alterations
04 – 07 September 2020
TRACK POSSESSIONS
Date From Date To From Boundary Tracks To Boundary Possession Protection
Officer Area
Metropolitan Freight Network
1
2230
04/09/2020
Continuous
0200
07/09/2020
Chullora Junction
Clear of 354 Points
Up Main
Down Main
Enfield West
EW418 Signal
SP3 Signal (YL/EYL)
PPO 1
Config 14
Southern Sydney Freight Line
2
2230
04/09/2020
Continuous
0200
07/09/2020
Enfield West
EW418 Signal
Glenfield
GF22 & GF23 Signals
SSFL
Leightonfield Loop
Glenfield Loop
Glenlee
GE25 Signal
PPO 1
Config 14
Main South
3
2230
04/09/2020
Continuous
0200
07/09/2020
Glenlee
GE23 Signal
GE25 Signal
36.0 (EYL) Signal
All Lines
Berrima Junction
Clear of
188 & 189 Points
PPO 1
Config 14
Amendment 1 TAA 1057- 2020 Issued 02 September 2020 (JH) Page 2 of 14
TRAIN ALTERATION ADVICE No: 1057 – 2020 Amendment 1
Date From Date To From Boundary Tracks To Boundary
Possession Protection
Officer Area
4
0400
05/09/2020
Continuous
0200
07/09/2020
Berrima Junction
Clear of 188 and 189
Points (Inclusive)
All Lines
Moss Vale
148.1 (EYL) Signal
MV88 Signal
MV21 Signal
Clear of Frames C, D, E & F
PPO 2
Goulburn
5
2230
04/09/2020
Continuous
0400
07/09/2020
Moss Vale
148.1 (EYL) Signal
MV88 Signal
Down Main
Up Main
Goulburn
G6 Signal
Clear of 101 and 102
Points (Inclusive)
PPO 2
Goulburn
6
0600
05/09/2020
Continuous
1800
07/09/2020
Goulburn
Clear of 101 and 102
Points
All Lines
Yass Junction
YJ 22 Signal
YJ 24 Signal
PPO 2
Goulburn
7
0600
05/09/2020
Continuous
1800
07/09/2020
Yass Junction
YJ 22 Signal
YJ 24 Signal
All Lines
Junee
JE 03 Signal
JE 02 Signal
Cootamundra
Clear of 104 & 107
Points
PPO 3
Cootamundra
Amendment 1 TAA 1057- 2020 Issued 02 September 2020 (JH) Page 3 of 14
TRAIN ALTERATION ADVICE No: 1057 – 2020 Amendment 1
Date From Date To From Boundary Tracks To Boundary
Possession Protection
Officer Area
8
0600
05/09/2020
Continuous
1800
07/09/2020
Junee
JE 03 Signal
JE 02 Signal
JE 15 Signal
All Lines Albury
AY56 Signal
PPO 4
Wagga / Parkes
Cootamundra – Goobang Junction Line
9
0600
05/09/2020
Continuous
1800
07/09/2020
Cootamundra
Clear of 104 & 107
Points (Inclusive)
All Lines
Stockinbingal
SL20 Signal
SL22 Signal
PPO 4 Wagga / Parkes
10
0600
05/09/2020
Continuous
1800
07/09/2020
Stockinbingal
Start/End Train Order Working
Board
All Lines
Goobang Junction
Start/End Train Order Working
Board
PPO 4
Wagga / Parkes
To be read in conjunction with:
• Sydney Trains STN 1930-2020, 1931-2020 • TAA 1164-2020 (Albury – Melbourne Closedown)
The following train alterations will apply:
Wednesday 2nd September 2020
Pacific National (Intermodal)
4PS6 on Wed 02/09/2020 will run as timetabled, arrive Goobang Jct Sat 05/09/2020 0805 depart 0901, pass CRN/ARTC Boundary Main Line - Parkes 0903, run as arranged by the CRN & Sydney Trains, pass Flemington MFN Border 1925, arrive SOY 1932 terminate
Approval No Derek Rogers / Michael
Irons
Project No/Type (Eg RCRM, MPM,CAP, if external ie non ARTC works - provide owner
entity name)
Work Description Location / KM's Scope Shift Tracks Affected Work
GroupPlant/
RescourcesProjectOwner Comments Possession Electrical Bonding required / Power out
permitt
1 MPM Vegetation Control
Targeted Location
within Possession Boundaries
Team 1: Removal and Mulching of Wattle trees: Linden Rd LXING
Galong (367.383 km both Up and Down Main)
Team 2: Cutting and spraying of saplings: Gerogery to Table Top
(613.300 km- 631.176 km both Up and Down sides) & Culcairn to
Wagga Wagga (597.330 km-525.922 km both Up and Down sides)
Team 1: Clayton Holder 06:00 18:00 0422 542 040
Team 2: Hannah Meyer 06:00 18:00 0439 316 363
Team 1: Clayton Holder 06:00 18:00 0422 542 040
Team 2: Hannah Meyer 06:00 18:00 0439 316 363
N/A
N/A
2 CAP Underbridge Renewal or Upgrade
236.000km - Yarra, RunOff
Waters Ck
236.000 -Yarra, Run Off Waters Ck - Face retransoming up main (42)
Kurt Ellsley 0600 1800 0407 872 973
Stephen Hedley 0600 1800 0409 999 167
Dave McDowell 0600 1800 0408 919 770
Stephen Hedley 0600 1800 0409 999 167
3 MPM
Steel Underbridge Repairs
(MPM)
236.000km - Yarra RunOff
Waters Ck
236.000-UB Repairs - Yarra, RunOff Waters Ck
236.019km – Down Main (fast clip & Pandrol sleepers) Remove TD on
bridge-Materials
-1 x 110m 60kg SC rail-2 x 13.7m 53km SC Rail.
-Scaffolding-Will need signal support
Kurt Ellsley 0600 1800 0407 872 973
Stephen Hedley 0600 1800 0409 999 167
Dave McDowell 0600 1800 0408 919 770
Stephen Hedley 0600 1800 0409 999 167
SIGNAL SUPPORT
WORKSITE CERTIFIER
Possession of Down
Main required
on 06 Sep 2020:
0600-1600 hours
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
Day Shift:
06 Sep 2020: 0600-1800 hours
PC Down MainRhomber
g Rail Aust PL
Hi-Rail Excavators,
Hi-Rail Trollies &
Tools
Tofiq Ahmed
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
WORKSITE CERTIFIER
Day Shift: 05 &
06 Sep 2020: 0600-1800 hours
PC Up MainRhomber
g Rail Aust PL
Hi-Rail Excavators,
Hi-Rail Trollies &
Tools
Tofiq Ahmed
Work Trains/Trac
k Machines can pass through Down
Main Only.Prior
arrangements must be made
with Project
Manager & Site
Full Possession of Up Main
Required on 05 & 06 Sep
2020
N/A
Full Possession N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
Day PC UP and Down Mains
Weedmasters PL
Excavator, Chipper & Chainsaws
Spray Rigs &
Chainsaws
Tofiq Ahmed
Plant can be
removed from track for track
machines movement
Worksite Contact Details
NB: if not ARTC works, please obtain application pack from [email protected] The Job No will be issued upon ARTC
acceptance of the proposal then sent to the [email protected] email. By
Derek / Michael
For any projects potentially impacting ARTC network, the minimum review time is 20 business days following receipt of completed application
pack at above email. Any queries to same address. SIA Possession Bid Sheet
Date : 2nd & 3rd of May 2020 Config if Required: Config 14 & NSW Super Possession Weekend :
4 CAP
Level Crossing
Upgrade or Renewal
428.948km - Cootamundra
,Temora Rd,Ped lxing
428.948 - Cootamundra, Temora Rd, Pedlxing - Upgrade
Upgrade pedestrian level crossing
Day & Night PC All Five (5)
TracksTaylor
Rail
Hi-Rail Excavators,
Tip Trucks,
Loader & Tools
Steven Twyford
Full Possession of all five (5) Track required during
Upgrade Works No Machines can pass through this site.
Full Possession N/A
5 CAP
Level Crossing
Upgrade or Renewal
428.956km - Cootamundra, Temora Rd
428.956-Temora Rd Lxing, Cootamundra - Upgrade
- Renew bitumen level crossing surface All 5 tracks
- Install slab / culvert upside where roundabout (old channel line) rodding
was located-53kg rail-Drainage
-T/O to remain timber-Concrete sleepers for other tracks
Day & Night PC All Five (5)
TracksTaylor
Rail
Hi-Rail Excavators,
Tip Trucks,
Loader & Tools
Steven Twyford
Full Possession of all five (5) Track required during
Upgrade Works No Machines can pass through this site.
Full Possession N/A
6 CAP
Level Crossing
Upgrade or Renewal
535.529km - Uranquinty,
Yarrangundry
535.529- Yarrangundry St, Uranquinty - Upgrade Main line
crossing with bitumenRerail, drainage ect
Murry Nolan 0600 1800 0424 164 007 Phillip Ibote 1800 0600 0484 863 484
Craig Jed Holdsworth 0600 1800 0438 008 117
Samuel Tom 1800 0600 0476 718 134
Don Walker 0600 1800 0419608863
Craig Jed Holdsworth 0600 1800 0438 008 117
7 CAP
Level Crossing
Upgrade or Renewal
580.200km - Henty,
Sladen Street
580.200 - Henty, Sladen Street - Upgrade Crossing to bitumen.
Drainage
Andrew Latimer 0600 1800 0477 387 487Michael Weston 1800 0600 0490 852 580
Simon Newman 0600 1800 0428 595 247Michael Davis 1800 0600 0419 250 737
Christopher Hutchinson 0600 1800 0477 708 987
TBC 0600 1800 TBC
8 MPM3 x Ballast Undercuttin
g Teams
Moss Vale Junction -
Yass
Team 1: (05-06/09/2020)Starts at Up main: 146.896km and
finishes at Up Main: 185.930 Team 2: (05-06/09/2020)
Starts at Up main: 193.045km and finishes at Up main: 186.130km
Team 3: (05-06/09/2020)Starts at Up main: 291.750km and finishes at Up Main: 263.216km
Viktoriya Subbota: Team 1 0700 1700 0415 858 085
Nicholas Borg: Team 2 0700 1700 0405 210 928
Neil Mitchison: Team 3 0700 1700 0467 574 519
Anthony King: Team 1 0700 1700 0431 393 400
Track Machines can pass through
sites with prior
arrangements made
with Project
Manager
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
WORKSITE SUPERVISOR
Team 1 & 2:
05-06/09/2020: 0700-1700 hours
Team 3:
05
Jason Walsh Jeremy Clark
William (Adam)
Up & Down Mains
Team 1: DMT PL
Team 2 & 3:
Quickway PL
Hi-Rail Excavators,
Tip Trucks,
Loader & Tools
Tofiq Ahmed N/A
PROTECTION OFFICER
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day & Night PC Main Downer
PL
Hi-Rail Excavators, Loader &
Tools
Tofiq Ahmed
Full Possession of Level Crossing Required
during works.
Full Possession
Full Possession of Level Crossing Required
during works. Track
Panels will be cut
Full Possession N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
PROTECTION OFFICER: Tim Ryan, 0434 255 780
Supervisor: Brett Schliebs 0417 245 768
PROTECTION OFFICER: Tim Ryan, 0434 255 780 , Supervisor: Brett Schliebs 0417 245
768
05-06/09/2020: 0600-1800 hours
05/09/2020: 1800-0600 hours
PC Main
Thee Rail
Specialist PL
Hi-Rail Excavators,
Hi-Rail Hydremas, Loaders &
Tools
Tofiq Ahmed
Aisake Parker: Team 2 0700 1700 0457 025 542
Mathew Sheehan: Team 3 0700 1700 0476 923 921
James Crisp 0700 1700 0449 543 216
Aisake Parker: Team 1 0700 1700 0457 025 542
Aisake Parker: Team 2 0700 1700 0457 025 542
Mathew Sheehan: Team 3 0700 1700 0476 923 921
9 MPMBallast
Undercutting (MPM)
Junee - Albury
Undercutting - Wagga PCRemoval of mudholes at various
locations
Jamie Bedimgfield 0600 1800 0438715641
shaun skates 0600 1800 0467766985
TBC 0600 1800 TBC
shaun skates 0600 1800 0467766985
10 MPM Tamping (MPM)
Joppa Junction to
Yass
Joppa Junction to Yass231.330km Joppa Jnc to 315.000km
YassKath Kirkness 0600 1800 0414 318 312 Joe Arregui 1800 0600 0405 921 886
Fred Keys 0600 1800 0474 000 623Daniel Jaunalksnis 1800 0600 0437 390 337
James Crisp 0600 1800 0449 543 216
Brett Bohringer 0600 1800 0418 261180 Daniel Jaunalksnis 1800 0600 0437 390 337
11 MPMTurnout Tamping
(MPM)
Exeter to Marulan
Turnouts and Plain Track Tamping between 155.000km Exeter to
193.000km MarulanLuke Murray 0600 1800 0400 299 286
Regan Woollard 0600 1800 0428 664 111
Dave McDowell 0600 1800 0408 919 770
Regan Woollard 0600 1800 0428 664 111
12 MPMTurnout Tamping
(MPM)
Marulan to Goulburn & Goulburn
Yard
Turnouts and Plain Track Tamping between 193.000km Marulan to
224.180km Goulburn and Goulburn Yard Works
Ethan Brophy 05-06/09/2020: 1200 2400 0403 141 545
Blake Davies 06/09/2020 0001 1200 0457 613 951
Ethan Brophy 05-06/09/2020: 1200 2400 0403 141 545
Blake Davies 06/09/2020 0001 1200 0457 613 951
Dave McDowell 0600 1800 0408919770
Ethan Brophy 05-06/09/2020: 1200 2400 0403 141 545
Justin Brimble06/09/2020 0001 1200 0402 759 562
13 MPM Tamping (MPM)
Yass to Cootamundra
Plain Track Tamping between 324.210km Yass and 428.000km
CootamundraPhil Sharp 0600 1800 0409 150 092
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
Day Shifts: 05 07
Dean Bradley Up & Down Rhomberg Rail
09-3X Hi-Production
Tamper
Tofiq
All Sites to make
necessary arrangeme
All Sites to make
necessary arrangements not to
hold Tampers
WORKSITE SUPERVISOR
1200 hours
on 05/09/2020 to 1200 hours
on 06/09/2020:
Goulburn
Yard Works1200-2400 hours
on 06/09/2020:
Goulbu
Site RepUp & Down
Mains & Goulburn Yard
Brimble Rail PL
Plasser Turnout Tamper (Unimat)
and Regulator,
Tools
Tofiq Ahmed
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day Shifts: 05-06 Sep 2020
Troy Collins Up & Down Mains
Brimble Rail PL
Plasser Turnout Tamper (07-275)
and Regulator,
Tools
Tofiq Ahmed
All Sites to make
necessary arrangements not to
hold Tampers
All Sites to make
necessary arrangements not to
hold Tampers
WORKSITE SUPERVISOR
Day Shifts: 05-07 Sep 2020 Night Shifts: 05-06 Sep 2020
Simon Grant (D) Rodney Walsh (N)
Up & Down Mains
Rhomberg Rail
Aust PL
09-3X Hi-Production
Tamper and
Regulator, Tools
Tofiq Ahmed
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day shaun Skates Main Wagga pc
Hi-Rail Excavators,
Tip Trucks,
Loader & Tools
Steve Skates
Track Machines can pass through
sites with prior
arrangements made
with Project
Manager and Site
Manager and Site
Supervisor
05-07/09/2020: 0700-1700 hours
y PL
SIGNAL SUPPORT
WORKSITE CERTIFIER
David Masters 0600 1800 0429 233 093
Mitch Saxby 0600 1800 0421147091
David Bowe 0600 1800 0407 233 093
14 MPMTurnout Tamping
(MPM)
Cootamundra to Junee
Turnouts and Plain Track Tamping between 428.956km Cootamundra
and 482.000km JuneePeter Klarner 0600 1800 0407 881 166
Warren Hill 0600 1800 0401 400 619
Don Walker 0600 1800 0419 608 863
Warren Hill 0600 1800 0401 400 619
15 MPM Tamping (MPM)
Junee - Wagga Wagga
Plain Track Tamping between 488.619km Junee and 428.000km
CootamundraGreg Nuss 0600 1600 0435 030 866
Kurt Beatty 0600 1600 0437 844 266
Steven Deweske 0600 1600 0417664778
Stan Alipate 0600 1600 0402 489 225
16 MPM Tamping (MPM)
Uranquinty to Henty
Turnout & Plain Track Tamping between 531.000km Uranquinty and
582.000km HentyShift 1: Sat: Matt
Woods 1700 0400 0439 062 523
Shift 2: Sun: Greg Nuss 0400 1400 0435 030 866
Shift 3: Sun: Matt Woods 1400 2200 0439 062 523
Shift 1: Sat: Craig McKenna 1700 0400 0411 674 772
Shift 2: Sun: Kurt Beatty 0400 1400 0437 844 266
Shift 3: Sun: Craig McKenna 1400 2200 0411 674 772
Jeff Bristow 0600 1800 0418 972 554
Shift 1: Sat: Craig McKenna 1700 0400 0411 674 772
Shift 2: Sun: Stan Alipate 0400 1400 0402 489 225
Shift 3: Sun: Craig McKenna 1400 2200 0411 674 772
17 MPM
Steel Underbridge Repairs
(MPM)
184.610km Underbridge-
Tallong
184.617km (Down Main Only) Remove LOB and wheelburns on
bridge. -Materials
-1 x 110m 60kg SC rail-2 x 13.7m 53km SC Rail.
-Scaffolding-Will need signal support-Will need traffic control
05/09/2020: Owen Nhang 1200 2100 0431 240 113
05/09/2020: Owen Nhang 0800 1900 0431 240 113
05/09/2020: Alexander Dennis 1200 2100 0429 998 841
05/09/2020: Alexander Dennis 1200 2100 0429 998 841
James Crisp 0600 1800 0449 543 216
Craig Jed Holdsworth 0800 1900 0438 008 117
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
05/09/2020:
1200 – 2100 hours
06/09/2020: 0800-1900 hours
PC Down Main
Thee Rail
Specialist PL
Hi-Rail Excavators, Loaders, Welding
Tools
Tofiq Ahmed
Access through
this site be available
at adjacent
Track with Prior Arrangements to be
made with Project
Manager and Site
Supervisor for any
passage required.
Full Possession
All Sites to make
necessary arrangements not to
hold Tampers
WORKSITE SUPERVISOR
Night & Day Site Rep Main Line &
LoopsTaylor Rail PL
Pandrol Jackson Tamper
and Regulator,
Tools
Tofiq Ahmed
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day Site Rep Main Taylor Rail PL
09-2X Hi-Production
Tamper and
Regulator, Tools
Tofiq Ahmed
All Sites to make
necessary arrangements not to
hold Tampers
All Sites to make
necessary arrangements not to
hold Tampers
WORKSITE SUPERVISORDay Paul Meale Up & Down Mains
Taylor Rail PL
Pandrol Jackson Tamper
and Regulator,
Tools
Tofiq Ahmed
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
SIGNAL SUPPORT
WORKSITE CERTIFIER
05-07 Sep 2020
Dean Bradley Mains g Rail
Aust PL
and
Regulator, Tools
Ahmed
arrangements not to
hold Tampers
18 MPM
Redundant Infrastructure Removal
Wallendbeen Yard
407.920 Km to 408.010
Km
Remove redundant infrastructure and straight rail 6AA points ,6AB
catch points ,3AA points 3AB points and Sim Recon,lay new sleepers, rail
weld out, and resurface
Day & Night PC Up & Down Main Earthtrac
k
Excavators, Loaders,
Dump Trucks,Water Cart and Resurfacing
Team
Steven Twyford
Access through this site may be available with Prior Arrangements to be
made with Project
Manager and Site
Supervisor for any
passage required.
Full Possession
19 CAPSteel
Component Upgrade
Wingello Yard
176.853 Km to 177.060
Km
3CA points replace L & R heeled switches with flexi switches .3CB
points replace L & R heelded switches withFlexi. 14 B points
replace heeled switches with flexi 4D Points
Down Main
Day PC Up & Down Main Taylor Rail
Excavator and
welding teams
Steven Twyford
Access through this site may be available with Prior Arrangements to be
made with Project
Manager and Site
Supervisor for any
passage required.
Full Possession
20 MPM Minor Re- railing
Lockersleigh creek bridge 200.700 Km
Remove defect rail up main,up & down rails 165m in length each rail
weld in new rail Day PC Up Main Railcon
Excavator and
welding teams
Steven Twyford
Access through this site may be available with Prior Arrangements to be
made with Project
Manager and Site
Supervisor for any
passage required.
Full Possession
21 CAP
Full Recondition Upgrade turnout
from timber to concrete
Goulburn Yard
225.200Km to 225.250Km
Remove 117A,B and C points. Do a full recondition replace turnout with
new concrete turnout
Day/Night PC Up & Down
mains John
Holland
Excavators, Loaders,
Dump Trucks,Water Cart and Resurfacing
Team
Steven Twyford
There will no access
through this site
Full Possession
22 CAPSteel
Component Upgrade
Goulburn Yard
225.200 Km to 225.250
Km
119A/B points replace L7R hand heeled switches with new flexi
switches Day PC Up & Down
mainsJohn
Holland
Excavator and
welding teams
Steven Twyford
Access through this site may be available with Prior Arrangements to be
made with Project
Manager and Site
Supervisor for any
passage required.
Full Possession
23 ARTC MPM Track Renewal 162.180km Skim Recon/Retimber 3BBpts
PROTECTION OFFICER
Protection Officer : Joanne Sepping 0421 852 202, Supervisor: Paul Vella 0414 066 210
Protection Officer: Paul Stephens 0477 860 964, Supervisor: Paul Whyler 0407 931 431
Protection Officer : Eddie Mott 0400 602 513, Supervisor: Lee Gomes 0401 647 824
Protection Officer Day: Hahn Germakain 0400 800 808, Protection officer Night: David Lawton 0466 981 838, Supervisor Day: Mal Gerrish 0439 631 524,
Supervisor Night: Brendan Woods 0458 379 010
Protection Officer Day: Hahn Germakain 0400 800 808, Protection officer Night: David Lawton 0466 981 838, Supervisor Day: Mal Gerrish 0439 631 524,
Supervisor Night: Brendan Woods 0458 379 010
Cherie Weiss 0600 1800 0408 987 380David Shore 1730 0530 0420 431 333Cherie Weiss 0500 1700 0408 987 380David Shore 1630 0230 0420 431 333
Ray McLellan 0700 1800 0407 879 178Jason Olejnik 1800 0600 0407 261 969
Dan Russ 0600 1600 0415 890 688Dan Russ 1600 2300 0415 890 688
Ray McLellan 0700 1700 0407 879 178
24 ARTC Incident Works Tree Removal 225.450km Remove overgrown Gum tree
Clayton Holder 0600 1800 0422 542 040
Clayton Holder 0600 1800 0422 542 040
N/A
TBA
25 CAPSpeno Defect
Removal
MossVale to Goulburn
Goulburn to Yass
Defect Removal
Andrew Lancaster 19:00 07:00 0400 999 977
James Callanan 0600 1800 0429 465 672
N/A
Adam Davidson 600 1800 0407222772
26 Incident
Renew left and right
hand switch and stock rail 116 B pts
485.323 Repairs to derailment site
Ben Caton 0600 1800 0439 407 060
Kiet Qauch 0600 1800 0408 887 445
Mick Vesperman 0600 1800 0427973979
Kiet Qauch 600 1800 0408 887 445
27 Incident
Renew right hand switch and stock rail 122 A pts
485.342 Repairs to derailment site
PROTECTION OFFICER
Nil Passing
SiteLPA
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
WORKSITE SUPERVISORDay M.Vesperman ALL main lines
except Down
ARTC / Contract
or
Welding equipment
Hi Rail Excavtor /
FEL / Dumpers
etc.
Steve Skates
SIGNAL SUPPORT
WORKSITE CERTIFIER
Sig Elec required
PROTECTION OFFICER
WORKSITE CERTIFIER
Day J.Callanan Up & Down Mains
Goulburn PC
Multiple Plant and resources
C McClella
nd
Up & Down mains
Full N/A
Full N/A
PROTECTION OFFICER
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day Site Rep
Up & Down Mains and Up refuge Plus Shunt Neck
Goulburn PC
Tree removalists with plant
C McClella
ndFlexible
C McClella
nd
Up Main total block
with resurfacing activitiies
FullBundanoon Pedestrian Level crossing affected. 3BBpts will be disconnected
during worksDay
Craig Bell (D) Jason Apps
(N)
Up & Down Mains
Goulburn PC
Multiple Plant and resources
Ben Caton 0600 1800 0439 407 060
Kiet Qauch 0600 1800 0408 887 445
Mick Vesperman 0600 1800 0427973979
Kiet Qauch 600 1800 0408 887 445
28 CAP
759 - Point Machine
Replacement
226.595- Goulburn
226.595 - Goulburn, 107A Pts - Upgrade
Pts machine upgrade as per 1819 design
-New cable route with Pit & Pipe-Wiring mods-New rodding-A & B timbers
PO - Day Shift 0600 1800Richard
Kambugu- 0451 663 049
PO - Night Shift 1800 0600 NA
Supervisor - Day Shift 0600 1800
Norman Smith- 0428
256 787 Supervisor - NIght Shift 1800 0600 NA
Day Shift 0600 1800Norman
Smith- 0428 256 787 Night Shift 1800 0600 NA
TBC 0600 1800 Jeff Hadaway- 0419 287 170
29 CAP
759 - Point Machine
Replacement
226.649- Goulburn
226.649 - Goulburn, 107B Pts - Upgrade
Pts machine upgrade as per 1819 design
-New cable route with Pit & Pipe-Wiring mods-New rodding-A & B timbers
PO - Day Shift 0600 1800Richard
Kambugu- 0451 663 049
Supervisor - Day Shift 0600 1800
Norman Smith- 0428
256 787
TBC 0600 1800Norman
Smith- 0428 256 787
TBC 0600 1800 Jeff Hadaway- 0419 287 170
30 CAP
759 - Point Machine
Replacement
226.523- Goulburn
226.523 - Goulburn, 109A CPts - Upgrade
Pts machine upgrade as per 1718 design
-New Pts machine-New cable route with Pit & Pipe
-Wiring Mods-New rodding
-A and B Timbers
PO - Day Shift 0600 1800Richard
Kambugu- 0451 663 049
Work Commenc
e with prior
arrangements made
with Project
Full Possession
WORKSITE SUPERVISOR
Day PC Refuge Loop SJM Excavators, Tools
Atiqul Hassan N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day PC Down Main SJM Excavators, Tools
Atiqul Hassan
Work Commenc
e with prior
arrangements made
with Project
Manager, PO & Site Supervisor.
Full Possession
Work Commenc
e with prior
arrangements made
with Project
Manager, PO & Site Supervisor.
Full Possession
WORKSITE SUPERVISORDay PC Up Main SJM Excavators, Tools
Atiqul Hassan
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
Sig Elec required WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day M.Versperman
ALL main lines except Down
ARTC / Contract
or
Welding equipment
Hi Rail Excavtor /
FEL / Dumpers
etc.
Steve Skates
Nil Passing
SiteLPA
Supervisor - Day Shift 0600 1800
Norman Smith- 0428
256 787
TBC 0600 1800Norman
Smith- 0428 256 787
TBC 0600 1800 Jeff Hadaway- 0419 287 170
31 CAP
759 - Point Machine
Replacement
226.578- Goulburn
226.578 - Goulburn, 109B Pts - Upgrade
Pts machine upgrade as per 1718 design
-New Pts machine-New cable route with Pit & Pipe.
-Wiring mods-New rodding-A&B timbers
PO - Day Shift 0600 1800Richard
Kambugu- 0451 663 049
Night Shift 1800 0600 NA
Supervisor - Day Shift 0600 1800
Norman Smith- 0428
256 787 Night Shift 1800 0600 NA
Day Shift 0600 1800Norman
Smith- 0428 256 787 Night Shift 1800 0600 NA
TBC 0600 1800 Jeff Hadaway- 0419 287 170
32 CAP
764 - Level Crossing Upgrade (Signals)
580.209 - Henty Sladen
St Lxing
- Changeover of the RX5 assemblies at Sladen Street Level Crossing- boom change and boom LED
upgradeDay Shift 0600 1800 From Civil
Day Shift 0600 1800Chris
Hutchinson - 0477 708 987
Day Shift 0600 1800 Mat Rehling - 0408 467 561
TBC 0600 1800 Mat Rehling - 0408 467 561
33 Wabtec Control Systems
Upgrade of Harefield (Main Rd)
Level Crossing
Harefield (Main Rd) - 496.934 km
Level Crossing upgrade and related changes to signalling system.
Paul Fysh 07:00 19:00 0490 008 662Greg Southam 19:00 07:00 0419 696 877
Julian Roberts 07:00 19:00 0448 025 473
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
5/09/2020 -
7/09/2020
Day
PCMain LineLoop Line
Stock SidingWabtec
No On-track plant / Hi-Rail required
Rod Flett
Block section Junee
JE75 to Bomen BN26 &
BN28 will show
occupied during works.Works
trains may pass
through section
On completion of works /
shift Harefield
Full Posession
Work trains may
pass through this site
with prior arrangeme
nt
Full Possession
WORKSITE SUPERVISOR
Day PC All Lines AldridgeEWP, Hi-
ab, Excavators
Atiqul Hassan
SIGNAL SUPPORT
WORKSITE CERTIFIER
NA
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day PC Up Main SJM Excavators, Tools
Atiqul Hassan
Work Commenc
e with prior
arrangements made
with Project
Manager, PO & Site Supervisor.
Full Possession
Manager, PO & Site Supervisor.
SIGNAL SUPPORT
WORKSITE CERTIFIER
34 John Holland
Working on Quarrey
Rd Overbridge
at Bundanoon, cracks on parapets
will be fixes from road
level
Quarry Road Overbridge
at Bundanoon,
Plating Cracks on
Both Parapets
Plating Cracks in Parapits and Spangel Wall EWP on Track
Kerry Anne Chomiszak 0600 1800 0411 368 416
David Milsom 0600 1800 0417 128 388
David Milsom 0600 1800 0417 128 388
35 John Holland
Farm access
(Burham's Rd)
OverbridgePlating
Cracks on Both
Parapets
152.000 - 152.100
No plant on track, working from road level
Graham Hill 0600 1800 0448 422 146
Joseph Bartlett 0600 1800 0400 915 346
David Milsom 0600 1800 0417 128 388
36 TfNSW (RMS)
Detailed inspection
of twin bridges
over Hume Highway
227.050 - 227.100
MOBI (under bridge platform) which will be parked on the top of the
bridge (on the Hume hwy ) with a swing boom /flat form to inspect the
bridge girders from underside
Akisi Turagavou. 0700 1700 0490 249 485
Will Sullivan 0700 1700 0407 495 472Syed Nowmani 0700 1700 0428 688 115
1 hour notice
required
Full Possession WORKSITE SUPERVISOR
0600-1700 Sat & Sun
UP and Down Mains
MOBI (under bridge
platform) which will be parked on the top
of the bridge (on the Hume hwy ) with a swing
boom /flat form to
inspect the bridge girders from
underside
Syed Nowmani
0428 688 115
syed.nowmani@r
ms.nsw.gov.au
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0700-1700 Sat & Sun
UP and Down Mains N/A
Deblina Chowdbu
ry0407
m.au
Full Possession
Full Possession
WORKSITE SUPERVISOR
5th & 6th
September
2020
0600 - 1800
Site Rep UP and Down Mains N/A
Deblina Chowdbu
ry0407
m.au
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
37 GHD
New level crossing staged works
Full Track Recondition
ing approximately 40m to
install strengthened subgrade
for a proposed new level crossing
577.500 - 578.500
Total Block no trains tp pass from 0600 Sat 5 Sept to 1800 Sun 6 Sept
with Track Machine to resurface
Symal - Graham Doneley 06:00 18:00 0499 085 978
Ryan Barnes 0.75 0.25 0415 151 128ASI - Meagan
Kuhn 06:00 18:00 0422 498 187
Symal - Emlyn Gray 0.75 0.25 0468 860 294
Symal - Luis Rodriguez 0.25 0.75 0477 500 092
ASI - Gary Docherty 06:00 18:00 0488 318 273
ASI - Matt Rehling 06:00 18:00 0408 467 561 ASI - Chris Hutchinson 06:00 18:00 0477 708 987
ASI - Matt Rehling (Signal
Certifier) 06:00 18:00 0408 487 561
Daryl Woodeson (Civil Certifier) 0.25 0.75 0428 470 126
38 CAPRerailing AMPR - SIA #K
165.178km-167.268km
Bundanoon - Penrose
Rerailing AMP 60kg H/H
PO. Gary Pipi 21:00 06:00 0458 575 936PO. Josh Pipi 06:00 18:00 0481 435 424
Support. Drew Paton 06:00 18:00 0409 833 966
PO. Gary Pipi 18:00 06:00 0458 575 936PO. Josh Pipi 06:00 18:00 0481 435 424
Support. Drew Paton 06:00 18:00 0409 833 966
PO. Gary Pipi 18:00 04:00 0458 575 936
Marc Ross 21:30 04:00 0419 827 888Corey Taylor 03:00 13:00 0407 525 269Marc Ross 14:00 02:00 0419 827 888
Corey Taylor 03:00 13:00 0407 525 269Marc Ross 14:00 22:00 0419 827 888
PO. Brian Koskela 21:00 09:00 0413 264 385Sig Elec. Colin
Shoemark 21:00 09:00 0409 586 620
PO. Brian Koskela 13:00 01:00 0413 264 385Sig Elec. Colin
Shoemark 13:00 01:00 0409 586 620
Marc Ross 0419 827 888
2300 Fri - 0200 Mon
Up Main
AMPRJHG
Programmed
Contractor / Plant
TBC
Steve Smith 0429
662 655
No Passing Possible
FELHi Rail
Excavator
LPA N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0600 Sat -1800 Sun
PC Single Main
Earthmomving
Equipment and tamper
Jeremy Smith0438
No Access Full Possession
39 CAP Rail Train #2
185.000km-155.000kmMedway - Moss Vale
67 x 110m 60kg Rails
Dean Fisher 21:30 07:30 0413 030 705Gary Pipi 21:30 06:00 0458 575 936
Todd Walklate 21:30 07:30 0416 640 274
Marc Ross 21:30 06:00 0419 827 888
Nicklaus Lichtenberger 0437 991 059
Marc Ross 21:30 06:00 0419 827 888
40 CAPRerailing AMPR - SIA #L
259.920km-260.085kmBreadalbane - Cullerin
Rerailing AMP 60kg H/H
PO. Adam Hartley 06:00 18:00 0477 119 124Support. Anthony
Grech 06:00 18:00 0498 181 096
Matthew Puttock 06:00 18:00 0424 380 992
PO. Anthony Neesom 04:00 16:00 0432 916 699
Sig Elec. Mick Every 04:00 16:00 0447 788 690
PO. Anthony Neesom 06:00 18:00 0432 916 699
Sig Elec. Mick Every 06:00 18:00 0447 788 690
PO. Anthony Neesom 08:00 20:00 0432 916 699
Sig Elec. Mick Every 08:00 20:00 0447 788 690
Matthew Puttock 06:00 18:00 0424 380 992
41 CAPRerailing AMPR - SIA #O
282.810km-283.360km
Gunning -
Oolong
Rerailing AMP 60kg H/H
PO. Fiona Saunders 06:00 18:00 0456 677 966
Support. Craig Klienberg 06:00 18:00 0417 355 916
Jye Kirkland 06:00 18:00 0408 839 202
PO. Anthony Neesom 04:00 16:00 0432 916 699
Sig Elec. Mick Every 04:00 16:00 0447 788 690
PO. Anthony Neesom 06:00 18:00 0432 916 699
Sig Elec. Mick Every 06:00 18:00 0447 788 690
PO. Anthony Neesom 08:00 20:00 0432 916 699
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0600 Sat to
1800 Mon
Down MainAMPR
Earthtrack
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
LPA N/A
LPA N/A
PROTECTION OFFICER
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
1200 Sun to
1800 Mon
Up Main AMPRAnric
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
No Passing Possible
FELHi Rail
Excavator
N/A N/A
PROTECTION OFFICER
PILOT2300 Fri - 0700 Sat
Up Main
AMPRJHG
Programmed
PN
1 x Railset
Adrain Unwin0419
634 639
Sig Elec. Mick Every 08:00 20:00 0447 788 690
Jye Kirkland 06:00 18:00 0408 839 202
42 CAPRerailing AMPR - SIA #Y
301.900km-302.155kmJerrawa -
Yass
Rerailing AMP 60kg H/H
PO. Fiona Saunders 06:00 18:00 0456 677 966
Support. Craig Klienberg 06:00 18:00 0417 355 916
Jye Kirkland 06:00 18:00 0408 839 202
PO. Anthony Neesom 04:00 16:00 0432 916 699
Sig Elec. Mick Every 04:00 16:00 0447 788 690
PO. Anthony Neesom 06:00 18:00 0432 916 699
Sig Elec. Mick Every 06:00 18:00 0447 788 690
PO. Anthony Neesom 08:00 20:00 0432 916 699
Sig Elec. Mick Every 08:00 20:00 0447 788 690
Jye Kirkland 06:00 18:00 0408 839 202
43 CAPRerailing AMPR - SIA #P
303.420km-304.010km Jerrawa -
Yass
Rerailing AMP 60kg H/H
PO. Fiona Saunders 06:00 18:00 0456 677 966
Support. Craig Klienberg 06:00 18:00 0417 355 916
Jye Kirkland 06:00 18:00 0408 839 202
PO. Anthony Neesom 04:00 16:00 0432 916 699
Sig Elec. Mick Every 04:00 16:00 0447 788 690
PO. Anthony Neesom 06:00 18:00 0432 916 699
Sig Elec. Mick Every 06:00 18:00 0447 788 690
PO. Anthony Neesom 08:00 20:00 0432 916 699
Sig Elec. Mick Every 08:00 20:00 0447 788 690
Jye Kirkland 06:00 18:00 0408 839 202
44 CAPRerailing AMPR - SIA #Q
334.580km-334.930kmBowning - Binalong
Rerailing AMP 60kg H/H
PO. Alex Burl 06:00 18:00 0402 793 580Support. John
Murray 06:00 18:00 0410 135 353
Nick Elliott 06:00 18:00 0401 487 0930600 Sat
Contracto
Steve
Nil / Limit
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Day / Night Site Rep Up Main AMPR
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
LPA
Nil / Limit Rail
Traffic During
LPA
LPA
WORKSITE CERTIFIER
WORKSITE SUPERVISOR0600 Sat to
1800 Mon
Down MainAMPREarthtr
ack
Contractor /
Plant TBC
Steve Smith 0429
662 655
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
PO. Chantelle Young 04:00 16:00 0415 150 559
Sig Elec. Danial Klaassen 04:00 16:00 0432 290 206
PO. Chantelle Young 06:00 18:00 416 150 559
Sig Elec. Danial Klaassen 06:00 18:00 0432 290 206
PO. Chantelle Young 08:00 20:00 417 150 559
Sig Elec. Danial Klaassen 08:00 20:00 0432 290 206
Nick Elliott 06:00 18:00 0401 487 093
45 CAPRerailing AMPR - SIA #S
347.370km-348.290kmBowning - Binalong
Rerailing AMP 60kg H/H (Single Leg Hi)
PO. Alex Burl 06:00 18:00 0402 793 580Support. John
Murray 06:00 18:00 0410 135 353
Nick Elliott 06:00 18:00 0401 487 093
PO. Chantelle Young 04:00 16:00 0415 150 559
Sig Elec. Danial Klaassen 04:00 16:00 0432 290 206
PO. Chantelle Young 06:00 18:00 416 150 559
Sig Elec. Danial Klaassen 06:00 18:00 0432 290 206
PO. Chantelle Young 08:00 20:00 417 150 559
Sig Elec. Danial Klaassen 08:00 20:00 0432 290 206
Nick Elliott 06:00 18:00 0401 487 093
46 CAPRerailing AMPR - SIA #T
353.790km-354.334kmBinalong - Binalong
Rerailing AMP 60kg H/H (Single Leg Hi)
PO. Nick Moutos 06:00 18:00 0424 237 147Support. Bob
Peters 06:00 18:00 0439 623 761
Luke Bruntflett 06:00 18:00 0455 596 270
PO. Desa Conelly 04:00 16:00 0400 766 746Sig Elec. Callum
Nolan 04:00 16:00 0459 432 252
PO. Desa Conelly 06:00 18:00 0400 766 746Sig Elec. Callum
Nolan 06:00 18:00 0459 432 252
PO. Desa Conelly 08:00 20:00 0400 766 746Sig Elec. Callum
Nolan 08:00 20:00 0459 432 252
David Horder 06:00 18:00 0479 067 398
47 CAPRerailing AMPR - SIA #U
360.085km-360.690kmBinalong -
Galong
Rerailing AMP 60kg H/H (Both Legs)
PO. Nick Moutos 06:00 18:00 0424 237 147
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0600 Sat to
1800 Mon
Up Main AMPRCAMS
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
LPA
Nil / Limit Rail
Traffic During
LPA
LPA
WORKSITE SUPERVISOR0600 Sat to
1800 Mon
Up Main AMPRCorfad
Contractor / Plant
TBC
Steve Smith 0429
662 655
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
Sat to
1800 Mon
Up Main AMPRCorfad
Contractor / Plant
TBC
Smith 0429
662 655
Rail Traffic During
LPA
LPA N/A
WORKSITE CERTIFIER
Support. Bob Peters 06:00 18:00 0439 623 761
Luke Bruntflett 06:00 18:00 0455 596 270
PO. Desa Conelly 04:00 16:00 0400 766 746Sig Elec. Callum
Nolan 04:00 16:00 0459 432 252
PO. Desa Conelly 06:00 18:00 0400 766 746Sig Elec. Callum
Nolan 06:00 18:00 0459 432 252
PO. Desa Conelly 08:00 20:00 0400 766 746Sig Elec. Callum
Nolan 08:00 20:00 0459 432 252
David Horder 06:00 18:00 0479 067 398
48 CAPRerailing AMPR - SIA #V
362.070km-362.510kmBinalong -
Galong
Rerailing AMP 60kg H/H (Both Legs)
PO. Pori Pipi 06:00 18:00 0431 475 719Support. Elsie
Sing 06:00 18:00 0426 802 822
Shaun Bouma 06:00 18:00 0477 347 582
PO. Dina Cairns 04:00 16:00 0411 105 617Sig Elec. Chris
Birkby 04:00 16:00 0419 039 101
PO. Dina Cairns 06:00 18:00 0411 105 617Sig Elec. Chris
Birkby 06:00 18:00 0419 039 101
PO. Dina Cairns 08:00 20:00 0411 105 617Sig Elec. Chris
Birkby 08:00 20:00 0419 039 101
Shaun Bouma 06:00 18:00 0477 347 582
49 CAPRerailing AMPR - SIA #W
367.850km-368.132kmGalong - Cunnigar
Rerailing AMP 60kg H/H (Single leg Low RESURFACE)
PO. Pori Pipi 06:00 18:00 0431 475 719Support. Elsie
Sing 06:00 18:00 0426 802 822
Shaun Bouma 06:00 18:00 0477 347 582
PO. Dina Cairns 04:00 16:00 0411 105 617Sig Elec. Chris
Birkby 04:00 16:00 0419 039 101
PO. Dina Cairns 06:00 18:00 0411 105 617Sig Elec. Chris
Birkby 06:00 18:00 0419 039 101
PO. Dina Cairns 08:00 20:00 0411 105 617Sig Elec. Chris
Birkby 08:00 20:00 0419 039 101
Shaun Bouma 06:00 18:00 0477 347 582
50 CAPRerailing AMPR - SIA #X
453.269km-454.039km
Junee - Cootamund
raBethungra
Spiral
Rerailing AMP 60kg H/H (Single Leg Hi)
PROTECTION OFFICER
Nil / Limit Rail
Traffic During
LPA
LPA
WORKSITE SUPERVISOR0600 Sat to
1800 Mon
Up MainAMPRQuickw
ay
Contractor / Plant
TBC
Steve Smith 0429
662 655
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
PROTECTION OFFICER
N/A
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0600 Sat to
1800 Mon
Up MainAMPRQuickw
ay
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
LPA
Nil / Limit Rail
Traffic During
LPA
LPA
WORKSITE SUPERVISOR0600 Sat to
1800 Mon
Up Main AMPRCAMS
Contractor / Plant
TBC
Steve Smith 0429
662 655
SIGNAL SUPPORT
WORKSITE CERTIFIER
N/A
Adam Hartley 06:00 18:00 0477 119 124Anthony Grech 06:00 18:00 0498 181 096
Matthew Puttock 06:00 18:00 0424 380 992
PO. Anthony Neesom 04:00 16:00 0432 916 699
Sig Elec. Mick Every 04:00 16:00 0447 788 690
PO. Anthony Neesom 06:00 18:00 0432 916 699
Sig Elec. Mick Every 06:00 18:00 0447 788 690
PO. Anthony Neesom 08:00 20:00 0432 916 699
Sig Elec. Mick Every 08:00 20:00 0447 788 690
Matthew Puttock 06:00 18:00 0424 380 992
51 CAPTrack
reconditioning
155.900 km Resurfacing and Drainage
TO Luke Murray 0600 1800 0400 299 286
Regan Woolard 0600 1800 0428 664 111
SJM Dave McDowell 0408 919 770
Regan Woolard 0600 1800 0428 664 111
52 RCRMSPENO
Ultrasonic run
Start Junee on Up main and work on
a face capturing both main
lines to Yass
Ultrasonic testing of rail to identify internal rail flaws
SPENO 5th of September 0600 1800 0427666488
SPENO 6th of September 0600 1800 0427666488
SPENO 7th of September 0600 1800 0427666488
53 CAPSpeno Defect
RemovalJunee-Albury Defect Removal
Shane green 0600 1800 0477328764
Shane green 0600 1800 0477328764
M. vesperman 0600 1800 0427973979
A. wheeler 600 1800 o418429549
54 CAP
Level Crossing
Upgrade or Renewal
Demondrille to
Cootamundra
418.640-Upgrade - Wallendbeen, Lxing
Paul Casey 0600 1800 0427 320 609
Corey Nuku 0600 1800 0457 577 222
Jeff Bristow 0600 1800 0418 972 554SIGNAL SUPPORT
N/A
PROTECTION OFFICER
WORKSITE SUPERVISORDay Site Rep Main
Earthtrack
Solutions PL
Hi-Rail Excavators,
Hi-Rail Hydremas, Loaders &
Tools
Tofiq Ahmed
All Sites to make
necessary arrangements not to
hold Tampers
1 hour notice
requiredFull
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE SUPERVISOR
Day S.Green All Tracks Wagga pc
Multiple Plant and resources
S.Skates
SIGNAL SUPPORT
WORKSITE CERTIFIER
Signal Support as Required
PROTECTION OFFICER
WORKSITE SUPERVISOR
SIGNAL SUPPORT
Day Dave Izzard Up main AND Down main
SPENO - 740CIV
SPENO car and hirail for
hand testers
Michael Simons
SPENO will require
track access via the PPO
as worksites permit.
May have to jump around
worksites and
traverse back to capture testing
Requires windows
Hi rail excavators, Loaders,
dump trucks, water carts,
resurfacing team
Steven Twyford Total Block Full
possession
WORKSITE CERTIFIER
PROTECTION OFFICER
WORKSITE CERTIFIER
NIL
Contact Michael Simons - 0427666488
Saturday
Only Day
C.Moloney Up and Down Contractor
N/A
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
0600 Sat
1200 Sun
Up / Down Main
AMPRAnric
Contractor / Plant
TBC
Steve Smith 0429
662 655
Nil / Limit Rail
Traffic During
LPA
LPA
Corey Nuku 0600 1800 0457 577 222
55 CAPSpeno Defect
RemovalYass - Junee Defect Removal
Dave Izzard 0600 1800 0477328764
Dave Izzard 0600 1800 0477328764
Rowen Bradley 0600 1800
Dave Izzard 600 1800 418429549
56 RCRM Track Patrol Yass - Junee End of Possession Track Patrol
Dave Izzard 0600 1800 0477328764
Mick Simons 0600 1800 0427666488
57 RCRM Track Patrol
Moss Vale - Yass End of Possession Track Patrol
Jason Apps 0600 1800 0409688452
Jason Apps 0600 1800 0409688452
SIGNAL SUPPORT
WORKSITE CERTIFIER
1 hour notice
requiredFull Signal Support as Required
PROTECTION OFFICER
WORKSITE SUPERVISOR
Day Jason Apps All Tracks Goulburn PC
Multiple Plant and resources
Curtis McClella
nd
WORKSITE SUPERVISOR
SIGNAL SUPPORT
WORKSITE CERTIFIER
Multiple Plant and resources
Mick Simons
1 hour notice
requiredFull Signal Support as Required
PROTECTION OFFICER
Day Mick Simons All Tracks Coota PC
WORKSITE SUPERVISOR
SIGNAL SUPPORT
Multiple Plant and resources
Mick Simons
1 hour notice
requiredFull Signal Support as Required
PROTECTION OFFICER
WORKSITE CERTIFIER
Day Dave Izzard All Tracks Coota PC
WORKSITE CERTIFIER
PROJECT MANAGER
SITE SUPERVISOR
PROTECTION OFFICER
CIVIL CERTIFIER
SIGNAL CERTIFIER
Name / Mobile No / Email Address
Down Up KM From KM To(Name / Mobile
No.)(Name / Mobile
No.)DN UP
(Name / Mobile No.)
(Name / Mobile No.)
PLANT DESCRIPTION
MOVEMENT DATE
MOVEMENT TIMES
MOVEMENT FROM / TO
DATE OF CANCELLATION
REASON FOR CANCELLATION
1 04/09/202005/09/2020
2300 to 0600Shift 1 - Rail Grinding
(LORAM RG415)
Bojan Svigelj0427 202104
Berrima to Tahmoor
Up Main Full Possession 0 0 143.295 km 91.846 km YES 0 0Ex Moss Vale Yard travel
to BerrimaJack Rubery
(0439 290 676)Aaron Johnson (0491 200 923)
N/A143.295km
to 91.846km
NOJack Rubery
(0439 290 676)
SJMChris Weir
(0419 250139)
LORAM RG419 Rail Grinder
4th to 5th Sept. 2020
23:00 to 06:00Up Main
143.295 km to 91.846 km
2 44079 0600 to 1900Shift 2 - Rail Grinding
(LORAM RG415)
Bojan Svigelj0427 202104
Tahmoor to Glenlee Jnct.
Glenlee Jnct. to Leightonfield
Up Main
SSFL Single Line
Full Possession 0 0
91.486 km
58.275 km
58.275 km
23.000 km
YES 0 0 UP Main through to SSFLSean Noble
(0474 737 213)Dean Carlisle
(0400 054 584)N/A
91.846kmto
20.400kmNO
Sean Noble (0474 737 213)
Andrew Woodford(0418 282258)
LORAM RG419 Rail Grinder
5th Sept. 2020
06:00 to 19:00Up Main
91.846km to 20.400km
3 05/09/202006/09/2020
1900 to 0430Shift 3 - Rail Grinding
(LORAM RG415)
Bojan Svigelj0427 202104
Leightonfield to Sefton Dive
Glenlee to Bargo
SSFL Single Line
Down Main
Full Possession 0 0
23.000 km
57.657km
20.400km
103.000 km
YES 0 0
Complete SSFL then transfer from Sefton Dive to Glenlee Junction Dn
Main (TOA)
Jack Rubery (0439 290 676)
Aaron Johnson (0491 200 923)
20.400kmto
103.000kmN/A NO
Jack Rubery (0439 290 676)
SJMChris Weir
(0419 250139)
LORAM RG419 Rail Grinder
5th to 6th Sept. 2020
19:00 to 04:30Dn Main
20.400km to 103.000km
4 44080 0430 to 1830Shift 4 - Rail Grinding
(LORAM RG415)
Bojan Svigelj0427 202104
Bargo to Berrima
Berrima to Bundanoon
Down Main
Up MainFull Possession 0 0
103.000 km
143.295km
143.295 km
162.698 kmYES 0 0
Transfer from Down to Up Main at Berrima
Sean Noble (0474 737 213)
Dean Carlisle(0400 054 584)
103.000kmto
162.700kmN/A NO
Sean Noble (0474 737 213)
Andrew Woodford(0418 282258)
LORAM RG419 Rail Grinder
6th Sept. 2020
04:30 to 18:30Dn Main
103.000km to 162.700km
5 06/09/202007/9/2020
1830 to 0300Shift 5 - Rail Grinding
(LORAM RG415)
Bojan Svigelj0427 202104
Bundanoon to Lynwood
Up Main Full Possession 0 0 162.698 km 200.000km YES 0 0 Stable clear of Lynwood Jack Rubery
(0439 290 676)Aaron Johnson (0491 200 923)
N/A162.700km
to 200.000km
NOJack Rubery
(0439 290 676)
SJMChris Weir
(0419 250139)
LORAM RG419 Rail Grinder
6th to 7th Sept. 2020
18:30 to 03:00Up Main
146.000km to 200.000km
6 05/09 - 06/090600-1700 Sat
& SunOHW Guy Anchor Footing Construction
Keshab Shrestha0437 081 034
Sydney TrainsLeumeah to
CampbelltownSSFL, Up & Dn
MainFull Possession LPA LPA S53+165 S53+329 NO NO YES
Access to SSFL for construction of footings on
Up South Main at SW53+165 and
SW53+329 and implement safety buffer
No plants on SSFL track
Antonio Curtale0419 421 766
Philip Ibote0484863484
S53+165 to S53+329
S53+165 to S53+329
YESLupco Kotevski0421 055 593
N/A Mobile Plants5/09/2020 and
06/09/202006:00 to 1630 daily
S53+165 to S53+329
No mobile plants on ARTC/SSFL2xHi-Rail Excavator,
1xDumpy,1xConcrete Pump truck to work on Up & Dn South Mains
7 05/09 - 06/090600 to 1630
Sat & SunOHW Rustry Pipe Replacment
Anh Nguyen0435 510 665
Sydney TrainsMinto To Leumeah
Up and Down South Main
Full Possession LPA LPA S50+700 S53+ 500 NO NO YES
2 MVE track machines will be working on Up and Down South Mains. No
work will be pefomed on ARTC SSFL.
Dzung Tran/ 0457525020
Muhammad Ahmed 0450661335
S50+200 to S54+000
S50+200 to S54+000
YES N/A N/A MVE5/09/2020 and
06/09/202006:00 to 1630 daily
S50+700 t0 S53+500
2 MVE track machines will be working on Up and Down South Mains. No work will
be pefomed on ARTC SSFL.
8 05/09 - 06/090600-1700 Sat
& SunOHW Clockwork weights replacement
Keshab Shrestha0437 081 034
Sydney Trains Macarthur Up & Dn Main Full Possession LPA LPA 56.433 58.416 NO NO YES
Access to SSFL required for Hi-Rail plants to get on the Up & Dn at 58.371km (Glenlee S/S) and travel
towards Macarthur Station. No works planned
on ARTC/SSFL track. Permission is required to implement safety buffer.
Darren Brettell0409 822 430
Nyasha Simbi0414199008
S56+433 to S58+416
S56+433 to S58+416
YES N/A N/A Hi-Rail Plants05/09/2020'06/09/2020
Sat 0530hrs &1700hrs
Sun 0530 & 1700hrs
S58+416 to/from S56+433 both
days
3xHi-Rail Plants access/exit through take-off pad at S58+371 Glenlee S/S on the Up & Dn Mn ARTC/SSFL and travel towards Macarthur Station. No works planned on
ARTC/SSFL track.
9 05/09 - 06/090600 to 1800
Sat & SunMittagong Station TAP Upgrade
Peter Page0411 016 322
Degnan Mittagong Station Up & Dn Main Full Possession LPA LPA 131.35 131.65 NO NO YESTrack access through site can be provided with 30
minute notice
Scott Porteous0425 559 567
Mark Hudson0400 871 526
131.350 131.650 YESTrack CertifierAaron Swain0429 922 929
N/A
alluminium scaffold, EWP, Knuckle Boom,
trucks and manitau (TBA), crane trucks, excavator (small), tippers, ladders, minor plant/tools
5/09/2020 and 06/09/2020
06:00 to 1800 daily131.350 to
131.650
As part of our scope, it will be necessary to close the pedestrian bridge. Members of the public will be directed to use the
pedestrian crossing (@ 131.685km) to the south of the Mittagong Station.
Note: this wil be advertised to the public (letterbox drop, signage, etc).
10 5th to 6th September
2020
07:00 to 20:30Enfield 373B Points -
Retimbering 50 timbers(Access site via Joseph St - Enfield PC site)
Bojan Svigelj (0427 202 104)
ARTC(Rhomberg Rail)
Berrima to Enfield West
West Enfield - Up Goods Road
Full possession SP03 EW418 19.949 km 19.949 km YES YES 0
LPA LimitGlenlee GE23/36 Signal Berrima 188PtsDn Main
189Pts Up Main / Glenlee Clear of 65Pts
Enfield West EW418 - Clear of 354Pts & SP03
to Clear of 354Pts
Justin Male / 0419 440 288
Huessin Allami/ 0424 933 229
20.5 19.5 NOJustin Male / 0419
440 288Sigtech Callum
Nolan 0459432 252 Front End Loader,
Hyrail Excavator 5-6/9/20 0600-1800 19.5-20.5
11 5th Sept - 6th Sept 2020
0700 - 1800Comms Pit installation
Site Walk
Simon Weaver0427848145
Sydney ProjectsLeightonfield to
GlenleeSSFL Full Possession LF11, LF13
GF16, GF18, GF22
27 36 NO YES 0Sunday likely a spare day. Works expected to finish
Saturday
Mohammad Obeid 0491061599
Hussein Al-Lami 27.000 36.000 NO Dan Wakefield N/AHydro Vac and
excavator 44079 0.291666667
12 4407906:00am - 18:00pm
Structure inspections of tunnels via hi-rail EWP
Matthew Dal Santo - 0472 501 080 -
Sterling Infrastructure
Picton Tunnel to Maldon Bridge
Rd
Hi-rail EWP only needs access to
one track - flexible for possession
manager to propose which track would suit
best
Full possession MN32 Dist. MN3 81.5 88 NO NO NO
Hi-rail access via Maldon Bridge road, unless a
closer access pad can be located
Matthew Dal Santo / 0472 501 080
Glen Charles / 0412 155 313 81,500KM 88,000KM YES N/A N/A Hi-Rail EWP 05/09/2020 Between 06:00am
and 18:00pm81,500KM - 88,000KM
Protection plan to be provided once completed
13 4407906:00am - 18:00pm
Structure inspections of tunnels via hi-rail EWP
Matthew Dal Santo - 0472 501 080 -
Sterling Infrastructure
Bowral tunnel to Railway Rd Burradoo
Hi-rail EWP only needs access to
one track - flexible for possession
manager to propose which track would suit
best
Full possession 82.5 87.4 134.9 140 NO NO NOHi-rail access via Railway
Rd, unless a closer access pad can be located
Liam Fetherston / 0429 506 414
Leanne Gray / 0422 208 208 134,900KM 140,000KM YES N/A N/A Hi-Rail EWP 05/09/2020 Between 06:00am
and 18:00pm134,900KM - 140,000KM
Protection plan to be provided once completed
14 4407906:00am - 18:00pm
Structure inspections of bridges via hi-rail EWP
Matthew Dal Santo - 0472 501 080 -
Sterling Infrastructure
Sefton area
Hi-rail EWP only needs access to
one track - flexible for possession
manager to propose which track would suit
best
Full possession EW407 LF6 20 22 NO NO NOAccess via access pad
near 47 Wellington Street, Birrong
Liam Fetherston / 0429 506 414
Leanne Gray / 0422 208 208 100,000KM 121,000KM YES N/A N/A Hi-Rail EWP 06/09/2020 Between 06:00am
and 18:00pm100,000KM - 121,000KM
Protection plan to be provided once completed
15 4408006:00am - 18:00pm
Structure inspections of tunnels via hi-rail EWP
Matthew Dal Santo - 0472 501 080 -
Sterling Infrastructure
Aymerton Tunnel to Great
Southern Road access pad,
Bargo
Hi-rail EWP only needs access to
one track - flexible for possession
manager to propose which track would suit
best
Full possession 303 80.8 100 125.5 NO NO NO
Hi-rail access via access pad near Great Southern
Rd in Bargo unless an access can be located
closer
Liam Fetherston / 0429 506 414
Leanne Gray / 0422 208 208 100,000KM 125,500KM YES N/A N/A Hi-Rail EWP 06/09/2020 Between 06:00am
and 18:00pm100,000KM - 125,500KM
Protection plan to be provided once completed
16 4408006:00am - 18:00pm
Structure inspections of tunnels via hi-rail EWP
Matthew Dal Santo - 0472 501 080 -
Sterling Infrastructure
Yerrinbool Tunnel to Great Southern Road
access pad, Bargo
Hi-rail EWP only needs access to
one track - flexible for possession
manager to propose which track would suit
best
Full possession 303 119 100 121 NO NO NO
Hi-rail access via access pad near Great Southern
Rd in Bargo unless an access can be located
closer
Matthew Dal Santo / 0472 501 080
Glen Charles / 0412 155 313 20,000KM 22,000KM YES N/A N/A Hi-Rail EWP 06/09/2020 Between 06:00am
and 18:00pm20,000KM - 22,000KM
Protection plan to be provided once completed
PROJECT CANCELLATION
CANCELLATION
PROJECT SCOPE DATE
WORKSITE PROTECTING SIGNAL NUMBER
Noise and public
notifications - Internal (See notes
below)
POSSESSION BID - PART BPOSSESSION BID - PART A
NOTES & COMMENTS
WORK HOURS
All lines/Main/Loop
/Up Main / Down Main - Single - Up
Goods/Bot / Dn Goods/ Bot
Possession Required (eg)
Windows / Full Possession /
PSW
SECTION (TO - FROM)
NOTES & COMMENTS
Protection Plan
completed and attached
(Yes/No)
WORKSITE LOCATION
Noise and public
notifications - External (See notes
below)
Do the works affect
signalling systems? (Yes/No)
PROTECTION KMProject No
CLOSEDPossession Bid - Part A Due: Possession Bid - Part B Due: CLOSED
Config 14 - Enfield to Berrima (SIA)2020 Possession.
POSSESSION WORK MATRIX V1
ON TRACK PLANT
ORGANISATION
175th & 6th
Septemper 2020
0600-1800
Undercutting Team 1
o Location 1: Down Main: 130 030-130 090km & Up Main: 130.000-130.155km
(Undercutting through T/Outs)o Location 2: Up Main: 113.250-113.400km
(Undercutting through T/Outs)
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
TBCTennessee to
MittagongUp & Down Mains -
Tennessee to Mittagong
Track Machines can pass through
Undercuttting Sites with prior
arrangements made with Project Manager and Site
Supervisor
0 0 21.6 130.155 NO YES YES 0Paul Follington:
Ph: 0419 197 410 Wayne McDonald : Ph: 0414 358 262
0 0 0Paul Follington: Ph:
0419 197 410 0
Hi-Rail Excavators, Tip Trucks, Loader
05-06/09/2020 0600-1800 hours 111.300-130.155 0
185th & 6th
Septemper 2020
0600-1800
Undercutting Team 2o Up Arrival Road: 143.300-143.400km
o Up Arrival: 146.020-145.880km (Through T/Outs)
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
TBC Moss Vale Yard Up Arrival Road
Track Machines can pass through
Undercuttting Sites with prior
arrangements made with Project Manager and Site
Supervisor
0 0 143.3 146.02 YES YES YES 0Anthony Martinuzzo:
Ph: 0410 510 005 Hasmukh Lal:
Ph: 0452 390 7880 0 0
Anthony Martinuzzo: Ph: 0410 510 005
0Hi-Rail Excavators, Tip Trucks, Loader
05-06/09/2020 0600-1800 hours 143.300-145.980 0
195th & 6th
Septemper 2020
0600-1800Undercutting Team 3
o Dn Main: 145.880-145.960km (Through T/Outs)
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
TBC Moss Vale Yard Down Main
Track Machines can pass through
Undercuttting Sites with prior
arrangements made with Project Manager and Site
Supervisor
0 0 145.88 145.96 YES YES YES 0Chris Pennings: Ph:0422 441 113
David Joseski : Ph:0410 530 775
0 0 0Anthony Martinuzzo:
Ph: 0410 510 005 0
Hi-Rail Excavators, Tip Trucks, Loader
05-06/09/2020 0600-1800 hours 145.915-146.020 0
205th & 6th
Septemper 2020
0600-1800
Track Resurfacing (09-32 Tamper)o Dn Main: 82.300-86.000kmo Up Main: 94.500-95.000kmo Up Main: 97.000-97.300kmo Up Main: 95.000-94.300kmo Up Main: 86.800-85.100km
o Dn Main: 106.800-107.500kmAdditional Tamping Locations as per updated
Scope
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
Laing O'Rourke Aust PL
Maldon to Tennessee
Up & Down Main
Worksites to make necessary
arrangements not to hold the Tampers
0 0 82.3 107.5 YES YES YES 0Phill Webb
Ph: 0409 716 934 Vince Constatino Ph: 0408 890 612
0 0 0Phill Webb
Ph: 0409 716 934 0
09-32 Tamper & Regulator
05-06/09/2020 0800-2000 hours 85.100-131.700 0
21
5th & 6th Septemper
20200600-1800
Turnout & Plain Track TamperoUp Arrival Road: 143 300-143 400km
oDn Main: 145 880-145 960km (Through T/Outs)
oUp Arrival: 146 020-145 880km (Through T/Outs)
oDown Main: 130 030-130 090km & Up Main: 130 000-130 155km
oUp Main: 113.250-113.400km
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
Laing O'Rourke Aust PL
Moss Vale Yard & Moss Vale to
Mittagong
Up Arrival RoadUp & Down Main
Worksites to make necessary
arrangements not to hold the Tampers
0 0 146.025 113.25 YES YES YES 0Jeff McGrath
Ph: 0409 473 944 Maurice Sharp
Ph: 0407 209 0080 0 0
Jeff McGrathPh: 0409 473 944
0Jackson Tamper &
Regulator05-06/09/2020 1200-2330 hours 130.000-146.500 0
225th & 6th
Septemper 2020
0600-180021.000-Track Remediation - Sefton Dive
Track Undercutting and Ballasting
Tofiq AhmedPh: 0437 959 279
Email: [email protected]
TBC Sefton Dive Down Goods 0 0 0 20.97 21.966 NO YES YES 0Joseph Gunn
Ph: 0408 208 142Wilfred Ndeda
Ph: 0478 018 5530 0 0
Kyle WardPh: 0427 800 823
0Hi-Rail Excavators, Tip Trucks, Loader
05-06/09/2020 0600-1800 20.750-22.000 0
235th and 6th September
2020
06:00hrs to 18:00hrs
Resurfacing, monitoring equipment maintenance
Chris Bloor 0422 807 231
BloorRail / SIMECTahmoor to
PictonUp and Down Main Full Possession 0 0 88.5 94 NO NO YES 0
Chris Jacobsen 0409 006 398
Jim Beggs 0413 561 016
88.500km 93.500km NOChris Jacobsen
0409 006 398N/A
09-32 Tamper and SSP110 Regulator
5th and 6th September
06:00hrs and 17:00hrs
A, 84.000km Picton Siding to
90.000km Worksite B, 90.000km
Worksite to 98.000km
Tahmoor Colliery and RTN C, 90.000km
Worksite to 84.000km Picton
Siding
A, WAR on Up Main, B, 17:00hrs Sat Transfer machine to Down Main at
Tahmoor Colliery stable on Down Main overnight, C, 17:00hrs Sun WAR on Down Main and stable in Picton Up Siding upon
completion
245th and 6th September
2020
06:00hrs to 18:00hrs
Track maintenance and monitoring equipment maintenance
Chris Bloor 0422 807 231
BloorRail / S32Menagle to
MaldonUp and Down Main Full Possession 0 0 68 76 NO NO YES 0
Craig Stuckey 0428 231 139
Bruno Pertout 0428 191 087
68.000km 76.000km NOBruno Pertout
0428 191 087N/A Hi Rails Various Various Various Hirails can be moved clear at anytime
25 04/09/202005/09/2020
2230 Fri to 2350 Sat
AMPR Rail TrainNate Gomes
0428 286 [email protected]
AMPRTHEE Rail
Pacific National
Berrima to Glenlee to
BerrimaUp and Down Full Possession 0 0 70 57 NO YES YES
See RT tab for Movement plan
Shift 1. Fri 2230-0700
Alex Dennis0429 998 841
Shift 2. Sat 0700 - 1700
Jed Holdsworth0438 008 117
Shift 1. Fri 2100-0700
Katelin O'Hara0438 718 082
Shift 2. Sat 0700 - 1700
Paul Casey0427 320 609
70.000km 58.000km NOJed Holdsworth0438 008 117
Nick Litchenberger0437 991 059
Rail TrainFEL
Hi Rail Excavator
4th and 5th September
22:00 to 23:50 0
Pilot: Shift 1. Fri 2100-0700 Andrew Sepping 0417 804 689
Shift 2. Sat 0700 - 1700 Brian Hilditch 0481 435 424
Shift 3. Sat 1700 - 0100 Andrew Sepping 0417 804 689
26 05/09/202006/09/2021
06:00hrs to 18:00hrs
Scrap Rail RecoveryNate Gomes
0428 286 [email protected]
AMPR Berrima to Mittagong
Up and Down Full Possession 0 0 135 140 NO YES YES 0 ???? ???? 134.000km 141.000km NO ????Nick Litchenberger
0437 991 059Hi Rails
5th and 6th September
06:00 to 18:00Daily
Various 0
27 05/09/2020 06/09/2020
07.00HRS/ 16.30HRS
Welding / Speno defect removal on the SSFL- 1X Welding crews various locations
Steve Chance -0418 630 440-
ARTC Glenlee / Sefton All Single line full 19 58.1 YES NO NO
1x wellding team, with contracr PO and
excavator. Removing speno rail defects at
Various locations on t6hs SSFL .km54.600
km51.061 km49.163 km36.450 km23.762
paul pearce 0418 435 727
Lang O Rouke Protection Office
25.000 58.000 NOpaul pearce 0418
435 727Ingelbrun Sgnal
Welding / Speno defect removal on the
SSFL- 1X Welding crews various
locations
1x wellding team, with contracr PO and excavator. Removing speno rail defects at
Various locations on t6hs SSFL .km54.600 km51.061 km49.163 km36.450
km23.762
28 05/09/2020 06/09/2020
07.00HRS/ 17.00HRS
Welding / Speno defect removal on the - 1X Welding crews various locations
Steve Chance -0418 630 440-
ARTCmittagong/
tahmoorup/dn mains full 100 000 130 000 NO YES YES
1x wellding team, with contracr PO and
excavator. Removing speno rail defects at
Various locations on the up and Down main ,
Between Mittagong and Tahamoor .km102.750 km103.320 km126.517 km128.230 km127.250
Scott Richerson 0416910391
SRS Solultion Protection Office
131.500 95.000 NOJosh Moran 0419690624
Ingelbrun Sgnal
Welding / Speno defect removal on the on the up and Down mains - 1X Welding
crews various locations
1x wellding team, with contracr PO and excavator. Removing speno rail defects at
Various locations on the up and Down main , Between Mittagong and Tahamoor
.km102.750 km103.320 km126.517 km128.230 km127.250
29 05/09/2020 06/09/2020
07.00HRS/ 16.30HRS
Clear out drains / remove mud and silk/ Lift and Pack through the Sefton dive to remove
TSR with Hi Rail Excavator.
Steve Chance -0418 630 440-
ARTC Sefton Dive All Single line full 20.4 21.966 NO YES YES
drainage cleaning at Sefton dive pumps area to remove silk spoil from drains, Plus remove rail
out of the dive area, Plus lift and pack through the Sefton dive to remove
TSR with Hi Rail Excavator,
Graham Doherty 0418881872
Under Tofiq Protection Officer
Contractor PO WORKS at Sefton
dive
20.000 21.200 NOGraham Doherty
0418881872
Clear out drains / remove mud and silk/ Lift and Pack through
the Sefton dive to remove TSR with Hi
Rail Excavator.
Clear out drains / remove mud and silk/ Lift and Pack through the Sefton dive to
remove TSR with Hi Rail Excavator.
30 05/09/2020 06/09/2020
16.00hrs to 00.00hrs
track patrol on the SSFL to berrima
Steve Chance -0418 630 440-
ARTCEnfield west to
Picton
All lines/Main/Loop/Up Main / Down Main -
Single - Up Goods/Bot / Dn
Goods/ Bot
full 17.8 143 000 NO NO NOEnd of Possession track Patrol from Enfield West
/Picton
Graham Doherty 0418881872
Josh Moran 0419690624
17.700 143.000 NOGraham Doherty
0418881872track patrol on the SSFL to Berrima
17.700 143.000 track patrol on the SSFL to Berrima
31 05/09/2020 06/09/2020
07.00HRS/ 16.30HRS
RCM Maintainance
Steve Chance -0418 630 440-
ARTCEnfield West to
Glenlee All Single line full 19 58.1 NO NO NO RCRM WORKS MST
Ardalan Esfandiari ( 0420 504 683 )
James Gent (0404360876)
Nil Nil NO NA NA Nil Nil Nil Nil Look out working only
32 05/09/2020 06/09/2020
07.00HRS/ 16.30HRS
track centre measuring
Steve Chance -0418 630 440-
ARTC maldon- tahmoor up/dn mains full 78 000 98 000 NO NO NOtrack centre measuring
crewadam davidson
0427561315rod odea
0427561315mobile crew NO
adam davidson 0427561315
n/a n/a 78 000 98 000 track centre measuring crew
33 05/09/2020 06/09/2020
07.00HRS/ 16.30HRS
solar greasepot install
Steve Chance -0418 630 440-
ARTC picton-yerrinbool up/dn mains full 90 000 120 000 NO NO NOinstall connect solar rail
lubricatorp hokianga
0432 579 175b pertout
042819108789 500 119 000
91 000 120 500
NOJosh Moran 0419690624
n/a n/a 90 000 120 000install connect solar rail lubricator (picton j beggs 0413561016)
(yerrinbool b pertout 0428191087)
34 5-6/09/200700 - 1900 Day
ShiftsSignal Maintenance
Danial Whitty/ 0427 412 004/
ARTC Possession Limits All Lines Full Possession N/A N/A TBC TBC YES NO NOSignal Maintenace works to be confirmed based on
tasks due under RCRM.
Day Shift - Matt McHugh, PH: 0434
487 713
Day Shift - Matt McHugh, PH: 0434
487 713
Possession Limits LOW
Only
Possession Limits
LOW OnlyNO N/A
Day Shift - Matt McHugh, PH: 0434
487 713N/A N/A N/A N/A
Works to be carried out mainly off track, minimal on track work to be undertaken
under LOW arrangements.
35 5-6/09/201900 - 0700 Night Shifts
Signal Maintenance
Danial Whitty/ 0427 412 004/
ARTC Possession Limits All Lines Full Possession N/A N/A TBC TBC YES NO NOSignal Maintenace works to be confirmed based on
tasks due under RCRM.
Night Shift - Chase Abbott, PH: 0458
077 967
Night Shift - Kieren Mullen, PH: 0427
868 289
Possession Limits WIC
Only
Possession Limits WIC
OnlyNO N/A
Night Shift - Chase Abbott, PH: 0458
077 967N/A N/A N/A N/A
All work to be WIC only. No work on track to be undertaken on night shifts outside of
daylight hours.
36 5-6/09/20 04:00 to 10:00Remove Axle Counters along SSFL prior to
Rail Grinding
Dan Whitty0427 412 004
ARTCSSFL
Macarthur to Enfield West
SSFL Single Line Full Possession 0 0 58.275km 20.435km YES YES 0
39 Worksite Locations where Axle Counters are
to be removed prior to Loram Rail Grinder
commences rail grinding the SSFL
Dan Whitty(0427 412 004)
Dan Whitty(0417 392 398)
20.435km 58.275km NO N/ADan Whitty
(0427 412 004)Nil
5th Sept. 2020
04:00 to 10:00SSFL
58.275km to 20.435km
Off track movements along SSFL route between Macarthur and Enfield West
37 5-6/09/20 12:00 to 24:00Replace & Recalibrate Axle Counters along
SSFL after completion of Rail Grinding
Dan Whitty0427 412 004
ARTCSSFL
Enfield West to Macarthur
SSFL Single Line Full Possession 0 0 20.435km 58.275km YES YES 0
Hi-Rail run to replace and recalibrate Axle Counters
at 39 locations after Loram Rail Grinder has
completed rail grinding the SSFL
Dan Whitty(0427 412 004)
Todd Holland (TVO)(0409 990 620)
20.435km 58.275km NO N/ADan Whitty
(0427 412 004)ARTC
Hi-Rail Vehicle6th
Sept. 202012:00 to 24:00
SSFL20.435km to
58.275km
HiRail vehicle moving between 39 axle counter sites along SSFL from Enfield
West and Macarthur
38 Friday04/09/2020
0700 to 1200Menangle 67.255km Remove Wayside
DeviceAlan Shore
(0409 368 122)ARTC
Glenlee - Douglas Park
Up Main ATP 0 42.6 67.255 67.255 0 YES NO
Removal required prior to rail gridning scheduled for
0845 Saturday 5th September 2020.
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
067.200 to
67.300NO
Alan Shore(0409 368 122)
N/A N/A 0 0 0Removal required prior to rail gridning
scheduled for 0845 Saturday 5th September.
39 Sunday06/09/2020
0700 to 1200Menangle 67.255km Reinstate & Recalibrate
Wayside DeviceAlan Shore
(0409 368 122)ARTC
Glenlee - Douglas Park
Up Main Possession 0 42.6 67.255 67.255 0 YES NOReinstatement required
following completion of rail gridning
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
067.200 to
67.301NO
Alan Shore(0409 368 122)
N/A N/A 0 0 0Reinstatement required following
completion of rail grinding
40 Friday04/09/2020
0700 to 1200Burradoo 138.020km Remove Wayside
DeviceAlan Shore
(0409 368 122)ARTC
Bowral - Berrima Junction
Down Main ATP 84.5 0 138.02 138.02 0 YES NO
Removal required prior to rail gridning scheduled for
0730 Sunday 6th September 2020.
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
137.950 to 138.050
0 NOAlan Shore
(0409 368 122)N/A N/A 0 0 0
Removal required prior to rail gridning scheduled for 0730 Sunday 6th
September.
41 Sunday06/09/2020
1200 to 1800Burradoo 138.020km Reinstate &
Recalibrate Wayside DeviceAlan Shore
(0409 368 122)ARTC
Bowral - Berrima Junction
Down Main Possession 84.5 0 138.02 138.02 0 YES NOReinstatement required
following completion of rail gridning
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
137.950 to 138.051
0 NOAlan Shore
(0409 368 122)N/A N/A 0 0 0
Reinstatement required following completion of rail grinding
42 Saturday05/09/2020
0700 to 1200Exeter 155.400km
Remove Wayside DeviceAlan Shore
(0409 368 122)ARTC
Moss Vale - Bundanoon
Up Main Possession 0 155.4 155.4 155.4 0 YES NO
Removal required prior to rail gridning scheduled for
19:30 Sunday 6th September 2020.
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
0155.350 to
155.450NO
Alan Shore(0409 368 122)
N/A N/A 0 0 0Removal required prior to rail gridning
scheduled for 19:30 Sunday 6th September.
43Mon.-Wed.
07/09/2020 - 09/09/2020
0700 to 1200Exeter 155.400km
Reinstate & Recalibrate Wayside DeviceAlan Shore
(0409 368 122)ARTC
Moss Vale - Bundanoon
Up Main ATP 0 155.4 155.4 155.4 0 YES NOReinstatement required
following completion of rail gridning
Alan Shore(0409 368 122)
Greg Boyd (0411 514 345)
0155.350 to
155.451NO
Alan Shore(0409 368 122)
N/A N/A 0 0 0Reinstatement required following
completion of rail grinding
445-6
September 2020
Sat 0700 – 1800 Sun 0700 – 1800
Inspect culverts Site 2 - Leumeah Water Way, 1 52.34km
- Leumeah Smiths Creek, 52.442km - Leumeah Water Way 2, 52.88km
annabelle Webb / 0412823174/
SydneyTrains Leumeah SSFL Lookout working 0 0 52 53 NO NO NOAccess only to get get
access to SydneyTrains culverts for inspections
Tristan Marwood (0415 369 933)
Jamil Kassem 0405 505 566
Nil Nil NO NA NA Nil Nil Nil Nil Look out working only
45 5-6 September
TBC Test SSFL and all Turnout to Moss ValeJosh Moran 0419
690 624 Speeno Chullora Jctn Moss Vale Possession 0 0 17.540 146.00 YES 0 0 Moving Worksite
Sam Cross 0431 848 346
Bob Cone 0455 625 360
0 0 0 0 0 Hi Rail Truck and RRV 0 0 0 Speeno Ultrasonic Testing
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Signalling: If answer is Yes then the "Signal Support Form" is to be filled in and sent to the relevant Signal WGL and approved by the SME prior to Section B being submitted
Noise Requirements:
Internal - Has assessment been conducted for the works using the ARTC Noise Construction Tool to identify affected sensitive receivers, and has notification been completed or is it planned to be completed to affected sensitive receivers a minimum 5 days prior to works commencing?
External - Has a noise assessment been conducted to identify noise impacts, and have affected sensitive receivers been notified, or planned to be notified a minimum 5 days prior to works commencing?
RELEVANT PHONE NUMBERS
EMERGENCY SERVICES:INJURY HOTLINE: 1800 686 130 ENVIROLINE: 1300 550 402 [email protected]
SIA CORRIDOR MANAGER: PROJECT DELIVERY MANAGER: STRUCTURES SPECIALIST: SIA PLC:
Site based
Kane Lean 0436 323 813Thomas Haffner 0427 416 995
Wael Naser 0428 263 361Raul Agoho 0427 104 430 Anthony Godfrey 0407 066 418Deane Thrower 0477 385 470
AREA MANAGER INGELBURN:AREA MANAGER GOULBURN:
Warren Williams 0438 672 296Steven Chance 0418 630 440Curtis McClelland 0429 016 107
SIA WORKS PLANNING MANAGER:
AREA SAFETY ADVISOR:ENVIROMENTAL ADVISOR:
Shift 1 Shift 2 Shift 3 Shift 4 Shift 5 Shift 604/09/2020 05/09/2020 05/09/2020 06/09/2020 06/09/2020 07/09/2020
2300 - 0500 06:30 -1200 Maintenance 1900 - 0430 0430 - 1330 Maintenance 1830 - 0100 0300 - 1200Berrima 143 23:00Mittagong 135 8 23:45 Up MainAlymerton 124 11 0:45Tennessee 113 11 1:45 SSFLBargo 103 10 2:45Tahmoor Colliery 98 5 3:15 Down MainRed Bank 92 6 51 3:45 6:30Picton 85 7 7:15Maldon 82 3 7:30Douglas Park 73 9 8:30Menengle Park 63 10 9:30Glenlee/SSFL 58 5 10:00Glenfield 41 17 12:00Cabramatta 32 9 60 12:00 Maintenance 19:00Leightonfield 23 9 20:00End LPA 20 3 21:00
TransferGlenlee/SSFL 58 38 22:00Menengle Park 63 5 22:30 19 125000 2375000Douglas Park 73 10 23:30 50Maldon 82 9 0:30 950 2500Picton 85 3 0:15Tahmoor Colliery 98 13 1:30Bargo 103 5 57 2:00 4:30Tennessee 113 10 5:30Alymerton 124 11 6:30Mittagong 135 11 7:30Berrima 143 8 8:30Moss Vale 147 4 9:00Exter 155 8 10:00Bundanoon 162 7 59 11:00 250000
Transfer 47Moss Vale 147 15 13:00 Maintenance 18:30 5319.149Exter 155 8 19:30Bundanoon 162 7 20:30Wingello 177 15 22:00Medway 189 12 23:00Lynwood 194 5 47 1:00 3:00Towarang 208 14Goulburn 222 28 42 12:00
Up Main Total 174SSFL Total 38Down Main 104Grand Total 316
Location Km Grind KmsShift Total
Pass KmTransfer
Kms
Leightonfield Cabramatta
Speno (Fri 2230-0300) 22:30 23:30
Signal Restoration (1200-2400 Sun) 12:00
Tunnel Inspection (Sun ) Team1Sefton Dive Undercutting/Ballasting (Sat & Sun: 0700-1700)RG Shift 2 (Sat 0630 -1200) 12:00
Cabramatta Loop (0600-1800)RG Shift 3 (Sat 1900 - 0430) 21:00 19:00
Transfer to Glenlee354
217 221
Speno (Fri 2230-0300) 0:30 1:30 2:30
Signal Restoration (1200-2400 Sun) 12:00
RG Shift 2 (Sat 0630 -1200) 11:00 10:00 9:30
Sydney Trains (0600-1800)Rail Train Unload 11:30
65
222 223
38
57.600
58Glenfield Loop Macarthur Jct
56 5751 52 53 54 5539 40 41 42 43 44 45 46 47 48 49 50
34 35 36 3729 30 31 32 3320.400 21.500
20.800 22 23 24 25 26 27 2822.434
DIVE
RG Shift 3 (Sat 1900 - 0430) 22:00 Sat 23:00
Speno (0500 - 0600) 4:30 5:00
Rail Train Unload 7:00 9:00
Empty Rail Train Glenlee - Moss Vale 18:00 Sat
Down 66 61 93 90 94 95
Up 65 60 91
SSFLSpeno (0300 - 0500) 2:30
Rail Train Unload 5:30 0:30 0:00
RG Shift 2 (Sat 0630 -1200) 9:30 8:30 7:30
Signal Restoration (1200-2400 Sun)Rail Train Unload 11:30 9:30
Tahmoor Colliery
RG Shift 3 (Sat 1900 - 0430) 0:00 Sun 1:00 Sun 2:00 SunLORA 09-32 Tamper (Sun 0830-2030-Dn Mn) SUNBloor Tamper (Sat 0600 - 1800) SATEmpty Rail Train Glenlee - Moss Vale 18:30 Sat
Down 100 106 108 112 114 310 1
Up 105 110 C 311Rail Train 23:30
RG Shift 1 (Fri 2300-0500) 5:00
RG Shift 2 (Sat 0630 -1200) 6:30
LORA 09-32 Tamper (Sat 0800-2000-Up Mn) SAT SAT SATBloor Tamper (Sun 0600 - 1800) SUNTunnel Inspection (Sat ) Team1
RG Shift 3 (1900 - 0430) 2:30 SunRG Shift 4 (Sun 0430 - 1330) 4:30 5:30 SunLORA 09-32 Tamper (Sun 0830-2030-Dn Mn) SUNEmpty Rail Train 19:30 Sat
Down
UpRail Train 23:00
RG Shift 1 (Fri 2300-0500) 4:00 3:00
LORA 09-32 Tamper (Sat 0800-2000-Up Mn) SATUndercutting Team (Sat 0700-1700) 100m
RG Shift 4 (Sun 0430 - 1330) 6:30 Sun 7:30 Sun 8:30 SunLORA 09-32 Tamper (Sun 0830-2030-Dn Mn) SUN SUN SUNUndercutting Team (Sun 0700-1700) 60m
LORA Jackson Tamper (Sun 1330-2300)Empty Rail Train 20:30 Sat 21:00 Sat
Tunnel Inspection (Sat ) Team 2Degman Mittagong Platform Sat & Sun 0600 -1800
Down 3 188
Up 2 189
57.657
57.600
Alymerton144
Berrima Jct
Douglas Park
91
Tenessee121116115
94
132130 131
89
143142
120
140 141134 135 136
Menangle Bridge
126 127
Picton
105 106 107 108 109
82 83 85 86 87
63 64
88
110
Mittagong
Menangle
95 96 97
77
98
76
9993
112 113 114
75
117 118 119
70 71 72 73 74
92
6968
90
137 138 139
81
6256 57 58 59
84
60 61
78 79 80Maldon
65 66 67
122 123 124 125
111100 101 102 103 104
133128 129
Degman Mittagong Platform Sat & Sun 0600 -1800Rail Train 22:30
RG Shift 1 (Fri 2300-0500) 2:00 1:00 23:00
LORA 09-32 Tamper (Sat 0800-2000-Up Mn) SAT SAT SATLORA 09-32 Tamper (Sun 0900-1000-Up Mn) SunUndercutting Team (Sun 0700-1700) 100mLORA Jackson Tamper (Sun 1330-2300)Tunnel Inspection (Sun ) Team 2
RG Shift 4 (Sun 0430 - 1330) 9:00 10:00 11:00 Transfer to Moss Vale50,51 Bridge Repairs
72 Exeter Platform ResurfacingBrimble Rail 07-275 Tamper (Sat 0700-1800, Sun 0600-1730) SAT SAT SAT SUN SUN
Down
Up72 Exeter Platform Recon 06:00 Sat
50,51 Bridge Repairs32 3BB Points Undercutting 06:00 Sat
Rail Train 7:00
Rail Unload57 ReRail
Brimble Rail 07-275 Tamper (Sat 0700-1800, Sun 0600-1730) SAT SAT SUN SUNRG Shift 5 (Sun 1830 - 0100) 18:30 Sun 19:30 20:30
28 Steel Component Change outTallong Bridge repairs
Down
Up
Steel Component Change outRail Train
3 Tallong Bridge repairsRG Shift 5 (Sun 1830 - 0100) 21:30 22:30 23:30
Undercutting Team 1 (Sat & Sun 0700-1700) SAT SUN SUN SUNUndercutting Team 2 (Sat & Sun 0700-1700) SUN SATBrimble Rail Unimat Tamper (Sun 1200-2330) SUN
Brimble Rail Unimat Tamper (Sun 1200-2330) SUN
Undercutting Team 2 (Sat & Sun 0700-1700) SAT
Down
Up
Rail Train 22:30 Fri29 Lockersleigh Bridge repairs
Towrang L-Xing UpgradeRG Shift 5 (Sun 1830 - 0100) 0:30 1:00
RG Shift 6 (Mon 0300 - 1200) 3:00 6:00
Undercutting Team 2 (Sat & Sun 0700-1700) SATBrimble Rail Unimat Tamper (Sun 1200-2330) SUN SUN SUN
GoulburnBrimble Rail Unimat Tamper (05/09/2020: 1200 to 06/09/2020: 2330)
Bridge Inspection7 Storm Damage Repairs
30,31 Gbn Yard 39-42Down
Up117 Points RenewalStorm Damage RepairsRG Shift 6 (Mon 0300 - 1200) 9:00 12:00
Bridge Inspection
Brimble Rail Unimat Tamper (05/09/2020: 1200 to 06/09/2020: 2330)SUN
230.600230 231224 225 226 227 228 229221 222 223211 212 213 214 215 216
23:00 - 23:30
03:00 - 06:00
192 193 194 195 208 209
186 187 188169
210Medway Marulan Lynwood
202 203 204 205 206 207196 197 198 199 200 201190 191
168159 160 161 162 163 164
189176 177 178 179 180 181 183 184 185
24:00 - 03:00
35
Wingello182
38
165 166 167BundanoonExeter
153 154 155 156 157 158
Sat: 1200 to Sun 1200
Sat: 1200 to Sun 1200SUN
148 149 150 151 152
170 171 172 173 174 175
147.995
148.099
219
197.346
197.500
217 218 220
RRA 09-3X Tamper (Sat 0700 - Mon 1600) SAT SAT SAT SAT SAT SAT SAT5,6 Retransom/ReRail
Down
Up
5,6 Retransom/ReRailRRA 09-3X Tamper (Sat 0700 - Mon 1600) SUN SUN SUN SUN
RRA 09-3X Tamper (Sat 0700 - Mon 1600) SAT SAT SAT SAT SAT SUNUndercutting Team 3 (Sat, Sun & Mon 0700-1700) SUN
Down
Up59 ReRail
RRA 09-3X Tamper (Sat 0700 - Mon 1600) SUN SUN SUN SUN SUN SUN SUN SUN SUNUndercutting Team 3 (Sat, Sun & Mon 0700-1700) SUN
RRA 09-3X Tamper (Sat 0700 - Mon 1600) SUN SUN SUN SUN MON MON MON
60 ReRail
Down
UpRRA 09-3X Tamper (Sat 0700 - Mon 1600) SUN MON MON MON MONUndercutting Team 3 (Sat, Sun & Mon 0700-1700) SAT
61 RerailRRA 09-3X Tamper (Sat 0700 - Mon 1600)
Down
Up
62 ReRail
RRA 09-3X Tamper (Sat 0700 - Mon 1600) MON MON MON
310
298
321311 312 313 314 315 316
292
317 318 319 320
286
305 306 307 308 309299 300 301 302 303 304
251 252
274 275
297293 294 295 296287 288 289 290 291281 282 283 284 285
271 272 273265 266 267 268 269 270264
238 239 240 241
253 254 255 256 257 259 260 261 262 263
230.600
248 249 250242 243 244 245 246 247
580m Single Leg
553m Single Leg
235230 231 232 233 234
258
236 237
276 277 278 279 280
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SAT SAT SAT
Down
Up
64 ReRail
RRA 09-3X Tamper (Sat-Mon: 0600-1600) MON
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SAT SAT SAT SAT SAT
Down
Up
65 ReRail
66 ReRail
67 ReRail68 ReRail
RRA 09-3X Tamper (Sat-Mon: 0600-1600) MON MON MON
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SAT SAT SAT SUN SUNSpeno (Mon)
Down
Up
69 ReRail
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SUN SUN SUN SUN
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SUN MON27 Wallendbean Yard. TO Removal
Speno (Mon)
Down
Up27 Wallendbean Yard. TO Removal
RRA 09-3X Tamper (Sat-Mon: 0600-1600) SUN SUN MON
Speno (Sun)TRA Jackson Tamper (Sat-Mon: 0600-1600) SUN SUN SAT SAT SAT SATWallendbean l-Xing
43 Signalling System Upgrade8,9 Temora Road
Down
Up8,9 Temora Road 43 Signalling System Upgrade
TRA Jackson Tamper (Sat-Mon: 0600-1600) SUN SUN MONSpeno (Mon)
Speno (Sun)TRA Jackson Tamper (Sat-Mon: 0600-1600) SAT SAT SAT SAT SAT
Down
Up
70 ReRail
TRA Jackson Tamper (Sat-Mon: 0600-1600) MON MONSpeno (Sat)Speno (Mon)
Speno (Sun)Down
Up
Speno (Sat)
`
Down
Up
481 482 483 484 485
476 477 478 479458 459 460 461 462 463 480470 471 472 473 474 475464 465 466 467 468 469
435 436 437 438 439 440 453 454 455447 448 449 450 451 452
433 434424 425 426 427 428 429
441 442 443 444 445 446 456 457
412 413 414 415 416 417 430 431 432
401 402 403 404 405 406
418 419 420 421 422 423
397 398 399 400
386 387 388383 384 385
407 408 409 410 411
380 381 382374 375 376 377 378 379366 367 368 369 370 371 372 373
389 390 391 392 393 394 395 396
364 365354 355 356 357 358 359353
338 339 340325
360 361 362 363
358m Single Leg
331
352
320 321 322 323 324
348 349 350 351
484.932
484.564
917m Single Leg
543m Single Leg
280m Single Leg
739m Single Leg
341 342
343 344 345 346 347
332 333 334 335 336 337326 327 328 329 330
Speno (Sat)37,38 Junee 116b , 122 points
TRA 09-2X Tamper (Sat & Mon: 0600-1600) MON MON SAT SAT48 Harefield L-Xing Upgrade
Speno (Sat)TRA 09-2X Tamper (Sat & Mon: 0600-1600) SAT SAT MON MON
TRA Jackson Tamper (Sat 1700 - Sun 2200) SUN SUN SUN SUN SUN11 Uranquinty L-Xing Upgrade
TRA Jackson Tamper (Sat 1700 - Sun 2200) SUN SAT
TRA Jackson Tamper (Sat 1700 - Sun 2200) SAT SUN53 Grubbin Road. install45 Henty L-Xing Upgrade
641 642 643 644 645635 636 637 638 639 640629 630 631 632 633 634623 624 625 626 627 628
600 601 602 603 604 605 618 619 620612 613 614 615 616 617
598 599589 590 591 592 593 594
606 607 608 609 610 611 621 622
577 578 579 580 581 582 595 596 597
566 567 568 569 570 571
583 584 585 586 587 588
562 563 564 565561
552 553548 549 550
572 573 574 575 576
532 533 534 535 536 537 538
560
551
529 530519 520 521 522 523 524
554 555 556 557 558 559
545 546 547539 540 541 542 543 544531
517 518
503 504 505490
525 526 527 528
488 489
513 514 515 516
484.392
484.564
Junee
Henty
506 507
508 509 510 511 512
497 498 499 500 501 502491 492 493 494 495 496485 486 487
04/09/2020 Stable at Picton Yard - 84.449km Up Refuge
05/09/2020 0800 hours Crew start at Picton Yard and Complete PWB 0830 hours Tamper Travel to 85.100km Up Main Site
0845-1145 hours Tamp Up Main: 85.100km-86.800km1200-1330 hours Tamp Up Main: 94.300-95.000km1345-1430 hours Tamp Up Main: 97.000-97.300km1500-1615 hours Tamp Up Main: 111.500-112.100km 1645-1745 hours Tamp Up Main: 125.300-125.700km1800-1930 hours Tamp Up Main: 129.000- 129.700km
05/09/2020 1930-2000 hours Stable Tamper at 131.076km Up Main - Mittagong Junction
06/09/2020 0830 hours Crew start at 131.076km Up Main - Mittagong Junction and Complete PWB 0900-1000 hours Tamp Up Main:131.200-131.700km1000-1030 hours Transfer Tamper at 130.140km 3C Pts from Up Main to Down Main and Reverse to 131.700km 1030-1130 hours Tamp Down Main: 131.700-131.200km1145-1300 hours Tamp Down Main: 129.700-129.000km1315-1430 hours Tamp Dn Main:126.300-125.750km1500-1630 hours Tamp Dn Main:107.500-106.800km1700-2000 hours Tamp Dn Main: 86.150-83.130km
05/09/2020 2000-2030 hours Transfer Tamper at 81.820km 106 Pts from Down Main to Up Main and Reverse back to 84.400km 110 Pts and Stable Tamper at Picton Up Refuge
LORA 09-32 Tamper Movements
04/09/2020 Stable at Moss Vale Yard
05/09/2020 1200 hours Crew start at Moss Vale Yard and Complete PWB 1230-1530 hours Tamp Up Main: 144.400-144.700km (Includes T/O)1545-1845 hours Tamp Up Main: 145.800-146.100km (Includes T/O) - 40m Undercutting 1900-2200 hours Tamp Dn Main: 145.800-146.200km (Includes T/O) - 100m Undercutting
05/09/2020 2200-2230 hours Stable Tamper at Moss Vale Yard
06/09/2020 1200 hours Crew start at Moss Vale Yard and Complete PWB 1230-1330 hours Tamp Up Arrival Road 143.300-143.400km 1330-1400 hours Travel Tamper at Down Main to 131.900km1400-1600 hours Tamp Down Main: 131.900-131.700km (Includes T/O)1600-1630 hours Transfer Tamper at 130.140km 3C Pts from Down to Up Main and Reverse to 131.900km 1630-1830 hours Tamp Up Main: 131.900-131.700km (Includes T/O)1845-2045 hours Tamp Up Main: 130.000-130.300km (Includes T/O)2100-2300 hours Tamp Down Main: 130.000-130.200km (Includes T/O)
06/09/2020 2300-2330 hours Stable Tamper at Breamar Branch Line.
LORA Jackson Tamper Movements
04/09/2020 Stable at Picton Yard - 84.449km Up Refuge
05/09/2020 0800 hours Crew start at Picton Yard and Complete PWB 0830 hours Tamper Travel to 85.100km Up Main Site
0845-1145 hours Tamp Up Main: 85.100km-86.800km1200-1330 hours Tamp Up Main: 94.300-95.000km1345-1430 hours Tamp Up Main: 97.000-97.300km1500-1615 hours Tamp Up Main: 111.500-112.100km 1645-1745 hours Tamp Up Main: 125.300-125.700km1800-1930 hours Tamp Up Main: 129.000- 129.700km
05/09/2020 1930-2000 hours Stable Tamper at 131.076km Up Main - Mittagong Junction
06/09/2020 0830 hours Crew start at 131.076km Up Main - Mittagong Junction and Complete PWB 0900-1000 hours Tamp Up Main:131.200-131.700km1000-1030 hours Transfer Tamper at 130.140km 3C Pts from Up Main to Down Main and Reverse to 131.700km 1030-1130 hours Tamp Down Main: 131.700-131.200km1145-1300 hours Tamp Down Main: 129.700-129.000km1315-1430 hours Tamp Dn Main:126.300-125.750km1500-1630 hours Tamp Dn Main:107.500-106.800km1700-2000 hours Tamp Dn Main: 86.150-83.130km
05/09/2020 2000-2030 hours Transfer Tamper at 81.820km 106 Pts from Down Main to Up Main and Reverse back to 84.400km 110 Pts and Stable Tamper at Picton Up Refuge
Tamper #: 1: LORA 09-32 Tamper Movements
04/09/2020 Stable at Moss Vale Yard
05/09/2020 1200 hours Crew start at Moss Vale Yard and Complete PWB 1230-1530 hours Tamp Up Main: 144.400-144.700km (Includes T/O)1545-1845 hours Tamp Up Main: 145.800-146.100km (Includes T/O) - 40m Undercutting 1900-2200 hours Tamp Dn Main: 145.800-146.200km (Includes T/O) - 100m Undercutting
05/09/2020 2200-2230 hours Stable Tamper at Moss Vale Yard
06/09/2020 1200 hours Crew start at Moss Vale Yard and Complete PWB 1230-1330 hours Tamp Up Arrival Road 143.300-143.400km 1330-1400 hours Travel Tamper at Down Main to 131.900km1400-1600 hours Tamp Down Main: 131.900-131.700km (Includes T/O)1600-1630 hours Transfer Tamper at 130.140km 3C Pts from Down to Up Main and Reverse to 131.900km 1630-1830 hours Tamp Up Main: 131.900-131.700km (Includes T/O)1845-2045 hours Tamp Up Main: 130.000-130.300km (Includes T/O)2100-2300 hours Tamp Down Main: 130.000-130.200km (Includes T/O)
06/09/2020 2300-2330 hours Stable Tamper at Breamar Branch Line.
Tamper #: 2: LORA Jackson Tamper
Track Km From Km To Length (m) Priority Ballast Stockpile Location Comments Shift Undercutting Team
Up Main 130.000 130.155 100 P1Ballast Stockpile at 129.900km- Downside (Access from
Ferguson St, Mittagong) Undercutting through 3C Pts Turnout Saturday: 05/09/2020 0700-1700 hours
Up Main 111.300 111.400 40 P1 Ballast Stockpile (250T) at 111.500km Upside
Up Main 111.650 111.850 60 P2
This site to source 100 Tonne ballast from 111.500km Upside Stockpile and remaining 140 Tonne to be sourced from
113.500km Upside Stockpile
Down Main 145.900 145.980 80 P1Ballast Stockpile (800T) at 145.140km Lackey Road, Moss Vale
Upside Laydown Area Undercutting through 152B Pts Turnout Saturday: 05/09/2020 0700-1700 hours
Up Arrival 143.300 143.400 60 P2Ballast Stockpile (200T) at 143.500km-Downside
Access from McCourt Road, Moss ValeSunday: 06/09/2020 0700-1700 hours
Up Main 146.010 146.020 10 P1Up Main 145.960 146.000 40 P2 Undercutting through 158A Pts Turnout
Up Main 145.915 145.940 25 P2 Undercutting through 149B PtsSunday: 06/09/2020 0700-1700 hours
Note:
Undercutting Team #: 3 may need to join Undercutting Team #: 1 on Sun 06/09/2020 to complete undercutting at Up Main: 111.650-111.850km
Undercutting - Tenessee to Moss Vale
Undercutting Team #: 1Sunday: 06/09/2020 0700-1700 hours
Undercutting Team #: 2Moss Vale Yard
Ballast Stockpile (800T) at 145.140km Lackey Road, Moss Vale Upside Laydown Area
Saturday: 05/09/2020 0700-1700 hours Undercutting Team #: 3
Moss Vale Yard
04/09/2020 Stable at Moss Vale Yard
05/09/2020 0630 hours Crew start at Moss Vale Yard and Complete PWB 0700-0730 hours Travel Tamper free at Up Main to 155.936km Exeter0730-1000 hours Tamp Up Main: 156.936-155.607km: (Includes Tamping in Exeter Platform area)1010-1130 hours Regulate and Broom High Ballast at Up Main: 149.500-148.350km1130-1230 hours Tamp Up Main: 147.034-146.896km (Includes Undercutting Sites: 147.034-147.014km, 147.001-146.992km & 146.905-146.896km)1230-1300 hours Transfer Tamper at 146.278km 161B Pts Moss Vale from Up to Down Main and Travel Free to 155.607km Exeter Site1300-1530 hours Tamp Down Main: 155.607-157.250km: (Includes Tamping in Exeter Platform area)1530-1700 hours Tamp Down Main: 157.950-159.280km1700-1730 hours Tamp Down Main: 161.510-161.800km
05/09/2020 1730-1800 hours Stable Tamper at 161.800km Down Main
06/09/2020 0530 hours Crew start at 161.800km Bundanoon and Complete PWB 0600-1200 hours Tamp Down Main: 161.800-162.700km and Tamp Up Main: 162.700-162.100km (Includes 3BB Pts Crossover - 3BB Crossover needs min 30mm lift)1200-1330 hours Tamp Up Main: 162.700-164.210km1340-1700 hours Tamp Up Main: 165.030-167.500km
06/09/2020 1700-1730 hours Reverse Tamper at Up Main to 162.353km Bundanoon and Stable at Bundanoon Up Refuge Siding.
Tamper #: 3: Brimble Rail Plasser (07-275) Tamper Movements
04/09/2020 Stable at Goulburn Yard
05/09/2020 1130 hours Crew start at Goulburn Yard and Complete PWB
1200 hours on 05/09/2020 to 1200 hours on 06/09/2020
06/09/2020 1130 hours Crew start at Goulburn Yard and Complete PWB 1200-1330 hours Tamp Up Main: 224.140-223.150km1345-1420 hours Tamp Up Main: 205.100-204.890km1430-1600 hours Tamp Up Main: 193.300-192.740km (Undercutting completed on 05/09/2020 at 193.045-193.053km, 192.902-192.91km, 192.882-192.894km & 192.87-192.878km)1600-1800 hours Tamp Up Main: 192.440-190.880km (Undercutting Completed on 05/09/2020 at 192.350-192.352km)1810-1930 hours Tamp Up Main: 188.400-187.360km (Undercutting Completed on 05/09/2020 at 188.165-188.17km, 188.09-188.091km & 188.045-188.062km)1930-2000 hours Reverse Tamper at Up Main to 189.649km-51 Pts Medway and Transfer from Up to Down Main2000-2130 hours Tamp Down Main: 192.150-193.010km (Undercutting Completed on 06/09/2020 at 192.810-192.812km & 192.960-192.966km)2145-2300 hours Tamp Down Main: 224.050-225.000km
06/09/2020 2300-2315 hours Stable Tamper at Goulburn Yard
Tamper #: 4: Brimble Rail Unimat Tamper Movements
Complete Tamping at 17A,B & C Pts Goulburn Yard and additional Tamping as per ARTC Project Manager/ARTC Resurfacing Representative Instructions
03/09/2020 Stable at Goulburn Yard
04/09/2020 2230-2330 hours Skeleton Crew to travel Tamper from Goulburn Yard to Goulburn South Refuge Loop and Stable till 0700 hours on 05/09/2020
05/09/2020 0630 hours Crew start at 231.330km Down Main site and complete PWB0700-0730 hours Tamp Down Main: 231.330-231.730km0730-0800 hours Tamp Down Main: 232.450-232.610km0800-0830 hours Tamp Down Main: 233.450-234.060km0830-1000 hours Tamp Down Main: 234.410-236.430km1010-1100 hours Tamp Down Main: 238.390-239.500km1115-1215 hours Tamp Down Main: 245.900-247.090km1230-1300 hours Tamp Down Main: 247.710-248.140km1300-1345 hours Tamp Down Main: 248.900-250.000km1400-1445 hours Tamp Down Main: 253.180-253.990km1445-1615 hours Tamp Down Main: 254.120-256.400km1700-1730 hours Tamp Down Main: 257.550-258.000km1740-1815 hours Tamp Down Main: 259.200-260.490km
1815-1830 hours Crew Changeover
1830-1900 hours Night Shift Crew complete PWB1900-1945 hours Tamp Down Main: 260.880-261.580km2000-2200 hours Tamp Down Main: 262.300-265.300km2210-2240 hours Tamp Down Main: 266.400-266.960km2250-2330 hours Tamp Down Main: 267.150-267.790km2340-0040 hours Tamp Down Main: 268.430-269.660km
06/09/2020 0050-0120 hours Tamp Down Main: 270.190-270.510km0130-0230 hours Tamp Down Main: 275.500-276.930km0240-0340 hours Tamp Down Main: 278.090-279.500km0350-0420 hours Tamp Down Main: 280.550-281.200km0430-0500 hours Tamp Down Main: 281.790-282.290km
0500-0630 hours Reverse Tamper at Down Main through to 230.400km Joppa Jnc 102 Pts and Transfer from Down Main to Up Main- Crew Changover at 0630 hours
06/09/2020 0630-0700 hours Day Shift Crew complete PWB0700-0730 hours Tamp Up Main: 235.000-235.400km0740-0830 hours Tamp Bridge Approaches at Up Main: 235.950-236.000km (City Approach) & 236.018-236.068km (Country Approach)0840-0910 hours Tamp Up Main: 239.280- 239.800km0930-1230 hours Tamp Up Main: 242.900-247.080km1240-1315 hours Tamp Up Main: 252.400- 253.250km1330-1430 hours Tamp Up Main: 254.120-255.200km1440-1600 hours Tamp Up Main: 259.290-260.085km 1615-1700 hours Tamp Up Main: 263.070-264.700km1715-1815 hours Tamp Up Main: 266.600-267.710km
1815-1830 hours Crew Changeover
06/09/2020 1830-1900 hours Night Shift Crew complete PWB1900-2000 hours Tamp Up Main: 268.490-269.480km2010-2110 hours Tamp Up Main: 270.190-271.000km2120-2200 hours Tamp Up Main: 271.300-271.800km2210-2240 hours Tamp Up Main: 274.540-274.940km2250-0020 hours Tamp Up Main: 278.000-279.630km
07/09/2020 0030-0150 hours Tamp Up Main: 280.550-281.790km0200-0250 hours Tamp Up Main: 283.780-284.430km0300-0350 hours Tamp Up Main: 289.080-289.900km0400-0530 hours Tamp Up Main: 294.950-296.460km0530-0630 hours Tamp Up Main: 296.740-297.400km
07/09/2020 0630-0700 hours Day Shift Crew complete PWB0700-0930 hours Tamp Up Main: 298.100-300.970km0940-1040 hours Tamp Up Main: 303.420km-304.010km - Single Leg 60kg Rail Replaced that requires Superelevation Correction1100-1200 hours Tamp Up Main: 314.080-315.000km
1200-1230 hours Transfer Tamper from Up Main to Down Main at 315.179km-51Pts and Reach 282.810km Re-Railing Site1230-1430 hours Tamp Down Main: 284.350-282.810km (Single Leg 60kg Rail Replaced that requires Superelevation Correction between 282.810-283.360km)1445-1520 hours Tamp Down Main: 291.260-291.550km
07/09/2020 1530-1600 hours Travel Tamper to 318.296km-56Pts Yass and Stable at Yass Yard
Tamper #: 5: RRA 09-3X Tamper Movements (Joppa to Yass)
Track Km From Km To Length (m) Shift CommentsUp main 146.896 146.905 9Up main 146.992 147.001 9Up main 147.014 147.034 20Up main 170.325 170.340 15Up main 170.350 170.352 2Up main 170.370 170.372 2Up main 170.424 170.430 6Up main 170.477 170.480 3Up main 170.500 170.501 1Up main 170.510 170.511 1
UP MAIN 173.494 173.500 6UP MAIN 173.562 173.580 18UP MAIN 173.714 173.720 6UP MAIN 173.746 173.750 4UP MAIN 173.772 173.780 8UP MAIN 173.790 173.800 10UP MAIN 173.866 173.900 4UP MAIN 173.940 173.950 10UP MAIN 174.020 174.022 2UP MAIN 174.040 174.041 1UP MAIN 174.140 174.143 3UP MAIN 174.330 174.332 2UP MAIN 174.355 174.356 1UP MAIN 174.520 174.523 3UP MAIN 174.710 174.713 3UP MAIN 174.760 174.623 3Up main 178.586 178.600 14Up main 178.620 178.640 20Up main 178.650 178.668 18Up main 178.665 178.670 5
DOWN MAIN 178.679 178.690 11DOWN MAIN 178.703 178.710 7
Up main 178.706 178.710 4Up main 178.715 178.720 5
DOWN MAIN 178.736 178.740 4DOWN MAIN 178.756 178.760 4
UP MAIN 178.790 178.792 2Up main 184.004 184.049 45Up main 185.435 185.439 4Up main 185.910 185.913 3Up main 185.922 185.930 8Up main 186.100 186.130 30Up main 186.155 186.170 15Up main 186.422 186.435 13Up main 188.045 188.062 17Up main 188.090 188.091 1Up main 188.165 188.170 5Up main 192.350 192.352 2
Down Main 192.810 192.812 2Up main 192.870 192.878 8Up main 192.882 192.894 12Up main 192.902 192.910 8
Down Main 192.960 192.966 6Up main 193.045 193.053 8Up main 263.190 263.216 26
Down Main 265.152 265.167 15 Down Main 265.189 265.191 2 Down Main 265.243 265.245 2
Up main 291.750 291.800 50Tuesday
0700-1700 hours
Saturday 0700-1700 hours
Undercutting Team 3: Starts at 185.435km and Finishes at 291.800km
Sunday 0700-1700 hours
Monday 0700-1700 hours
Undercutting - Moss Vale to Yass
Saturday 0700-1700 hours
Undercutting Team 1: Starts at 146.896km and Finishes at 174.523km
Sunday 0700-1700 hours
Saturday 0700-1700 hours
Undercutting Team 2: Starts at 174.710km and Finishes at 184.049km
Sunday 0700-1700 hours
04/09/2020 Stable at Yass Yard
05/09/2020 0630 hours Crew start at Yass Yard and complete PWB0700-0800 hours Tamp Down Main: 324.210-325.070km0800-0830 hours Tamp Down Main: 325.690-326.280km0815-0930 hours Tamp Down Main: 338.500-340.100km0940-1010 hours Tamp Down Main: 342.330-342.610km1030-1130 hours Tamp Down Main: 343.040-343.950km1145-1215 hours Tamp Down Main: 349.980-350.390km1230-1300 hours Tamp Down Main: 354.340-354.450km1300-1330 hours Tamp Down Main: 354.760-355.090km1345-1415 hours Tamp Down Main: 357.120-357.540km1430-1515 hours Tamp Down Main: 367.130-367.790km1515-1540 hours Tamp Down Main: 367.870-368.150km1600-1800 hours Tamp Down Main: 384.450-386.500km1800-1830 hours Stable at Harden Yard Up Goods Siding
06/09/2020 0630 hours Crew start at Harden Yard and complete PWB0700-0900 hours Tamp Down Main: 386.500-389.000km0900-0930 hours Transfer Tamper at 388.282km-110 Pts Harden from Down to Up Main and Reverse to 389.520km0930-1000 hours Tamp Up Main: 389.520-389.250km1015-1215 hours Tamp Up Main: 386.400-384.700km1230-1315 hours Tamp Up Main: 382.950-382.150km1330-1415 hours Tamp Up Main: 375.400-374.720km1415-1445 hours Tamp Up Main: 374.510-374.190km1500-1530 hours Tamp Up Main: 368.150-367.850km (Single Leg 60kg Rail Replaced that requires Superelevation Correction at 367.850km-368.132km)1530-1600 hours Reverse Tamper at Up Main back through to 407.580km Wallenbeen Site1600-1830 hours Complete portion of Tampinig at 407.580-409.800Km Up Main (Wallendbeen Straight Railing Site) - TSR at Up Main: 407.580-409.800Km
1830 hours Stable at 408.010km Up Main
07/09/2020 0630 hours Crew start at 408.010km Wallendbeen and complete PWB0700-1030 hours Complete required Tamping at Up and Down Main at 407.920-408.010km Wallendbeen Straight Railing Site - TSR at Dn Main: 407.950-408.150km1030-1100 hours Transfer Tamper from Down to Up Main at 388.282km Harden 110Pts and travel free following shunt tes loco to 355.700km site1100-1145 hours Tamp Up Main: 355.700-355.000km1200-1330 hours Tamp Up Main: 354.550-353.190km (Single Leg 60kg Rail Replaced that requires Superelevation Correction at 353.790km-354.334km)1345-1530 hours Tamp Up Main: 348.300-346.100km (Single Leg 60kg Rail Replaced that requires Superelevation Correction at 348.290km-347.370km)1545-1630 hours Tamp Up Main 334.930km-334.580km (Single Leg 60kg Rail Replaced that requires Superelevation Correction)1630-1700 hours Travel Tamper to Yass and Stable at Yass Yard.
Tamper #: 6: RRA 09-3X Tamper Movements (Yass to Wallendbeen)
04/09/2020 Stable Tamper at Bethungra Yard
05/09/2020 0630 hours Crew start at Bethungra Yard and complete PWB0700-0830 hours Tamp Down Main: 452.780-452.130km0830-1000 hours Tamp Down Main: 451.620-450.400km1010-1115 hours Tamp Down Main: 448.400-447.880km1130-1230 hours Tamp Down Main: 436.940-436.180km1245-1415 hours Tamp Down Main: 435.580-434.140km1430-1515 hours Tamp Down Main: 433.420-433.030km1530-1730 hours Tamp Down Main: 432.230-430.150km1730-1800 hours Stable Tamper at Cootamundra Yard
06/09/2020 0530 hours Crew start at Cootamundra Yard and complete PWB0600-1700 hours Tamp 428.956km Temora Road, Cootamundra Level Crossing Five Tracks and adjacent Turntouts (Tamping of Down Main must cover: 427.260-429.360km)
1730 hours Stable Tamper at Cootamundra Yard
07/09/2020 0700 hours Crew start at Cootamundra Yard and complete PWB0730-0900 hours Tamp Up Main: 431.060-430.000km
0900-1030 hours
1030-1230 hours Tamp Up Main: 453.269km-454.039km (Single Leg 60kg Rail Replaced that requires Superelevation Correction)1300-1600 hours Tamp Up Main: 442.750-445.560km1600-1645 hours Travel Tamper free at Up Main to Cootamundra and Stable at Cootamundra Yard
Tamper #: 7: TRA Pandrol Jackson Tamper Movements (Cootamundra to Bethungra)
Transfer Tamper from Up to Down Main at 430.023km-133 Pts, Travel to 456.194km Bethungra 3B Pts, transfer from Down to Up Main and reach Re-Railing site at 454.039km (Shunt Test Loco Travelling to Cootamundra at Up Main)
04/09/2020 Stable at Junee Yard
05/09/2020 0630 hours Crew start at Junee Yard and complete PWB0700-0730 hours Travel Tamper free to 499.000km Harefield0730-1030 hours Tamp 499.000-502.500km1045-1130 hours Tamp 504.320-505.100km1140-1400 hours Tamp 508.000-511.000km1410-1520 hours Tamp 512.270-513.700km1530-1600 hours Travel Tamper to Wagga and Stable at Wagga Yard
06/09/2020 0630-1800 hours
07/09/2020 0600 hours Crew start at Wagga Yard and complete PWB0630-0645 hours Travel Tamper to 527.180km Site0645-1015 hours Tamp 527.180-524.000km1015-1030 hours Travel Tamper to Wagga Loop for Shunt Test Loco to pass at Main Line towards Uranquinty1030-1230 hours Tamp 522.500-520.570km1300-1400 hours Tamp 496.400-495.700km (Undercutting completed duirng possession at 496.350-496.355km)1400-1530 hours Tamp 495.300-494.000km (Undercutting completed during possession at 494.400-494.405km, 494.100-494.105km, 494.040-494.045km)1545-1630 hours Tamp 484.570-484.300km (Undercutting completed during possession at 484.560-484.565km, 484.340-484.370km)1630-1645 hours Stable Tamper at Junee Yard
Tamper #: 8: TRA 09-2X Tamper Movements (Junee to Wagga)
Keep Tamper Stabled at Wagga Yard (This Tamper Crew to Operate Tamper 9 - TRA Pandrol Jackson - 0400-1500 hours on 06/09/2020 between Uranquinty and Henty)
04/09/2020 Stable at Yerong Creek Yard-Goods Siding Southern End Only (Enter Goods Siding from Southern End: 565.236km Only)
05/09/2020 1630 hours Crew start at Yerong Creek Yard and complete PWB1700-1730 hours Travel Tamper free to 577.500km Grubben Road Level Crossing Site1730-2100 hours Tamp 578km Grubben Road Level Crossing Site2140-0115 hours Tamp 567.000-565.242km Passing Lane
06/09/2020 0130-0245 hours Tamp 560.700-560.050km 0245-0345 hours Travel Tamper to 579.700km Sladen Street, Henty Level Crossing Site and stable at 570.700km
06/09/2020 0400 hours Day Shift Crew Start at 0400 hours at 579.700km
06/09/2020 0400-0430 hours Day Shift Crew start at 579.700km and complete PWB0430-0700 hours Tamp 580.200km Sladen Street Level Crossing Site at Main and Loop Line Includes Turnout Tamping0700-0900 hours Travel Tamper to 536.029km Yarragundry Street, Uranquinty Level Crossing Site0900-1200 hours Tamp 535.580-535.480km Yarragundry Street Level Crossing Site at both Main Line and Loop Line - Includes Turnout Tamping1200-1400 hours Tamp 535.580-536.500km Mainline
1400 hours Stable Tamper at 536.500km
06/09/2020 1400 hours Crew Start shift at 536.500km and complete PWB1430-1530 hours Tamp 535.050-535.480km Passing Lane1440-2040 hours Tamp 534.500-531.500km2100-2200 hours Tamp 545.500-546.000km Mainline
06/09/2020 2230 hours Stable Tamper at 550.500km The Rock Yard
Tamper #: 9: TRA Pandrol Jackson Tamper Movements (Henty to Uranquinty)
Prior to possession test the following:
Main Line, Passing Lanes and Loops as required Albury to Wagga. Fernleigh Road 524.546km.
Run Light to Bomen. Test Passing Lane.
Run Light to Shepherds Siding 504.660km.
Test Shepherds Siding 504.660km to Marinna 478.138km
Main Line, Loops, Up Main and Down Main as required.
Test Up Main Bethungra 456.611km to Olympic Highway 449.872km
Saturday 5th
On Track Fernleigh Road 524.546km test Main Line to Test Shepherds Siding 504.660km.
Including Viaduct.
Travel to Marinna 478.138km
On Track Marinna 478.138km test UP Main Line to Bethungra 456.611km
41.413km
Sunday 6th
On Track Cootamundra Cowcumbla Road 430.753km test Down Main Line to Marinna 478.138km
Change Tracks.
On Track Marinna 478.138km test UP Main Line to Marinna Bethungra 456.611km
68.912km
Monday 7th
On Track Olympic Highway 449.872km test UP Main Line to Cootamundra 430.753km
Travel to Cunningar
On Track Cunningar 381.153km test DOWN Main Line to Cootamundra 430.753km
Tuesday 8th
On Track Cootamundra 430.753km test UP Main Line to Cunningar 381.153km
49.600km
Then As Traffic Permits
Date Time Scope Base Code Location Dur Km From Km To Comments
04/09/2020 22:00 Put on Track ??? 0:30 Put on at ????04/09/2020 22:30 Run to test 0:1004/09/2020 22:40 Test Track 12986 Southern Sydney Freight Line 0:15 20.421 22.30404/09/2020 22:55 Test Track 14986 Southern Sydney Freight Line 0:20 20.660 24.28304/09/2020 23:15 Shunt to test Southern Sydney Freight Line 0:15 24.283 22.57304/09/2020 23:30 Test Track 11471 Leightonfield Loop 0:10 22.573 24.28304/09/2020 23:40 Test Track 14986 Southern Sydney Freight Line 0:35 24.283 28.21005/09/2020 00:15 Test Track 14986 Southern Sydney Freight Line 0:55 31.774 39.34705/09/2020 01:10 Test Track 17986 Glenfield Loop 0:10 39.347 41.47505/09/2020 01:20 Shunt to test Southern Sydney Freight Line 0:15 41.475 39.34705/09/2020 01:35 Test Track 14986 Southern Sydney Freight Line 1:35 41.475 58.09205/09/2020 03:10 Test Track 13922 Glenlee 66 Crossover 0:25 58.107 58.25105/09/2020 03:35 Run to test 0:0505/09/2020 03:40 Test Track 13711 Glenlee 61 Crossover 0:25 59.265 59.34505/09/2020 04:05 Run to test 0:0505/09/2020 04:10 Test Track 13899 Glenlee 93 Crossover 0:25 60.251 60.42405/09/2020 04:35 Run to test 0:0505/09/2020 04:40 Test Track 13343 Glenlee 90 Crossover 0:25 60.495 60.54005/09/2020 05:05 Run to test 0:1005/09/2020 05:15 Test Track 13926 Menangle Park 94 Crossover 0:25 62.941 63.05105/09/2020 05:40 Test Track 13927 Menangle Park 95 Crossover 0:25 63.069 63.17905/09/2020 06:05 Take Off Track 0:30 Take off at ????Menangle Park 95 Crossover
Date Time Scope Base Code Location Dur Km From Km To Comments
05/09/2020 21:00 Put on Track ??? 0:30 Put on at ????05/09/2020 21:30 Run to test 0:1005/09/2020 21:40 Test Track 13467 Mittagong 17 Cross Over 0:25 131.730 131.81605/09/2020 22:05 Run to test 0:3005/09/2020 22:35 Test Track 13275 Berrima Junction 188 Crossover 0:25 143.243 143.29505/09/2020 23:00 Run to test 0:0505/09/2020 23:05 Test Track 13930 Moss Vale 113 Crossover 0:25 144.458 144.54205/09/2020 23:30 Test Track 13931 Moss Vale 119 Crossover 0:25 144.554 144.64005/09/2020 23:55 Run to test 0:0506/09/2020 0:00 Test Track 13932 Moss Vale 137 Crossover 0:25 145.180 145.26006/09/2020 0:25 Test Track 13933 Moss Vale 140 Crossover 0:25 145.264 145.32406/09/2020 0:50 Run to test 0:0506/09/2020 0:55 Test Track 13934 Moss Vale 158 Crossover 0:25 145.950 146.01106/09/2020 1:20 Run to test 0:0506/09/2020 1:25 Test Track 13935 Moss Vale 161 Crossover 0:25 146.195 146.278
Proposed Speno Ultra Sonic Test Programmme' September 2020
06/09/2020 1:50 Take off track ??? 0:30 Take off at ???? **Note to Kiwi - would they be better off travelling track??06/09/2020 3:15 Put on Track 0:30 Put on at ????06/09/2020 3:45 Run to test 0:0506/09/2020 3:50 Test Track 13462 Medway 51 Crossover 0:25 189.640 189.73006/09/2020 4:15 Run to test 0:2006/09/2020 4:35 Test Track 13925 Lynwood Junction 61 Crossover 0:25 196.228 196.35806/09/2020 5:00 Take Off Track 0:30 Take off at ????Lynwood Junction 61 Crossover
Date Time Scope Base Code Location Dur Km From Km To Comments
06/09/2020 20:00 Put on Track ??? 0:30 Put on at ????06/09/2020 20:30 Run to test 0:0506/09/2020 20:35 Test Track 13372 Tahmoor 310 Crossover 0:25 97.570 97.63006/09/2020 21:00 Run to test 0:2006/09/2020 21:20 Test Track 13939 Picton 114 Crossover 0:25 85.767 85.87806/09/2020 21:45 Run to test 0:0506/09/2020 21:50 Test Track 13938 Picton 112 Crossover 0:25 85.638 85.74906/09/2020 22:15 Run to test 0:1006/09/2020 22:25 Test Track 13924 Maldon 106 Crossover 0:25 81.580 81.82006/09/2020 22:50 Run to test 0:0506/09/2020 22:55 Test Track 13923 Maldon 100 Crossover 0:25 81.180 81.28906/09/2020 23:20 Take off track ??? 0:30 Take off at ???? Maldon 100 Crossover???07/09/2020 1:00 Put on Track ??? 0:30 Put on at ????07/09/2020 1:30 Shunt to test 0:20 18.909 17.08507/09/2020 1:50 Test Track 10150 Enfield West Jct to Sefton East Jct Down 0:15 17.085 20.42107/09/2020 2:05 Shunt to Pad 0:20 20.421 18.00007/09/2020 2:25 Shunt to test 0:15 18.000 21.28507/09/2020 2:40 Test Track 10151 Enfield West Jct to Sefton East Jct Up 0:30 21.285 17.08407/09/2020 3:10 Shunt to test 0:20 17.084 16.46907/09/2020 3:30 Test Track 10090 Botany Line UP 0:20 16.469 14.03107/09/2020 3:50 Test Track 11036 Cooks River Run Round Road 0:15 14.031 14.63607/09/2020 4:05 Shunt to test 0:05 14.636 14.03107/09/2020 4:10 Test Track 10090 Botany Line UP 0:10 14.031 13.61507/09/2020 4:20 Test Track 11813 Cooks River Loop 0:15 13.615 12.82207/09/2020 4:35 Shunt to test 0:10 12.822 13.61507/09/2020 4:45 Test Track 10090 Botany Line UP 0:15 13.615 12.61007/09/2020 5:00 Test Track 10089 Botany Line Down 0:40 12.610 16.47207/09/2020 5:40 Shunt to test 0:30 16.472 12.61007/09/2020 6:10 Test Track 10089 Botany Line Single 0:15 12.610 9.94107/09/2020 6:25 Take Off Track 0:30 Take off at ????
Date Time Scope Base Code Location Dur Km From Km To Comments
07/09/2020 20:00 Put on Track ??? 0:30 Put on at ????07/09/2020 20:30 Run to test 0:10
07/09/2020 20:40 Test Track 11581 Botany Departure Rd 2 0:25 6.620 9.25007/09/2020 21:05 Shunt to test 0:30 9.250 6.62007/09/2020 21:35 Test Track 11582 Botany Departure Road 1 0:25 6.620 9.29307/09/2020 22:00 Shunt to test 0:20 9.293 7.42807/09/2020 22:20 Test Track 11577 Botany Arrival Rd 2 0:25 7.428 9.94107/09/2020 22:45 Shunt to test 0:20 9.941 6.85607/09/2020 23:05 Test Track 10089 Botany Arrival Rd 1 0:25 6.856 9.94107/09/2020 23:30 Shunt to test 0:20 9.941 6.37107/09/2020 23:50 Test Track 10092 Metropolitan Goods Main Down 1:30 6.371 18.90908/09/2020 1:20 Test Track 10094 Metropolitan Goods Main Up 1:30 18.909 6.37108/09/2020 2:50 Shunt to test 0:40 6.371 13.73108/09/2020 3:30 Test Track 10246 Enfield South-Nth Via Delec Single Line (Link to No 1 Staging Rd 0:10 13.731 13.90708/09/2020 3:40 Test Track 14078 Enfield Staging Rd 1 0:20 13.907 16.82908/09/2020 4:00 Shunt to test 0:20 16.829 14.53608/09/2020 4:20 Test Track 14133 Enfield Staging Rd 2 0:15 14.536 16.44808/09/2020 4:35 Shunt to test 0:10 16.448 17.16008/09/2020 4:45 Test Track 10195 North Fork to Metro Goods Line 0:10 17.160 17.60008/09/2020 4:55 Take Off Track 0:30 Take off at ????
Night Shift 08/09 - Contingency Night (if required)
Version 1.0 Date of last revision: 13 August 2019 Page 1 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Infrastructure Certification and Handover Form
This form is to be used to certify that the work on the infrastructure has been completed in accordance with the original scope and is fit for operational use.
Project Description Km’s From Km’s To Track(s) Location
: :
: :
: :
: :
I certify that the infrastructure has been constructed and is being handed over in accordance with the original scope and is fit for traffic in accordance with ARTC’s relevant
standards, practices and procedures.
Certification Details
Infrastructure Certifying Person (Name) Contact No. Certifying Qualification Signature Time/Date Remarks
Track
Electrical
Signals
Structure
Drainage
Earthworks
Environment
Operations
Version 1.0 Date of last revision: 13 August 2019 Page 2 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Civil or Signalling Equipment Book Out of Use and Restored to Use: Yes / No
Infrastructure Booking Authority Form Completed: Yes / No Attached: Yes / No
Outstanding Scope / Any Minor Defects:
List any temporary works installed that may affect the reliability, safety
or operation of the system (speed restrictions, temporary boards, etc.):
Project Manager Area Manager Asset Management Representative Operational Representative
Name:
Name:
Name:
Name:
Signature:
Signature:
Signature:
Signature:
Date:
Date:
Date:
Date:
Version 1.0 Date of last revision: 13 August 2019 Page 1 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Infrastructure Certification and Handover Form
This form is to be used to certify that the work on the infrastructure has been completed in accordance with the original scope and is fit for operational use.
Project Description Km’s From Km’s To Track(s) Location
: :
: :
: :
: :
I certify that the infrastructure has been constructed and is being handed over in accordance with the original scope and is fit for traffic in accordance with ARTC’s relevant
standards, practices and procedures.
Certification Details
Infrastructure Certifying Person (Name) Contact No. Certifying Qualification Signature Time/Date Remarks
Track
Electrical
Signals
Structure
Drainage
Earthworks
Environment
Operations
Version 1.0 Date of last revision: 13 August 2019 Page 2 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Civil or Signalling Equipment Book Out of Use and Restored to Use: Yes / No
Infrastructure Booking Authority Form Completed: Yes / No Attached: Yes / No
Outstanding Scope / Any Minor Defects:
List any temporary works installed that may affect the reliability, safety
or operation of the system (speed restrictions, temporary boards, etc.):
Project Manager Area Manager Asset Management Representative Operational Representative
Name:
Name:
Name:
Name:
Signature:
Signature:
Signature:
Signature:
Date:
Date:
Date:
Date:
Version 1.0 Date of last revision: 13 August 2019 Page 1 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Infrastructure Certification and Handover Form
This form is to be used to certify that the work on the infrastructure has been completed in accordance with the original scope and is fit for operational use.
Project Description Km’s From Km’s To Track(s) Location
: :
: :
: :
: :
I certify that the infrastructure has been constructed and is being handed over in accordance with the original scope and is fit for traffic in accordance with ARTC’s relevant
standards, practices and procedures.
Certification Details
Infrastructure Certifying Person (Name) Contact No. Certifying Qualification Signature Time/Date Remarks
Track
Electrical
Signals
Structure
Drainage
Earthworks
Environment
Operations
Version 1.0 Date of last revision: 13 August 2019 Page 2 of 2 This document is uncontrolled when printed. See ARTC Intranet for latest version.
Engineering (General) Procedure - Form EGP-20-01 Project Management
Form number: EGP2001T-10
Civil or Signalling Equipment Book Out of Use and Restored to Use: Yes / No
Infrastructure Booking Authority Form Completed: Yes / No Attached: Yes / No
Outstanding Scope / Any Minor Defects:
List any temporary works installed that may affect the reliability, safety
or operation of the system (speed restrictions, temporary boards, etc.):
Project Manager Area Manager Asset Management Representative Operational Representative
Name:
Name:
Name:
Name:
Signature:
Signature:
Signature:
Signature:
Date:
Date:
Date:
Date:
Shift Commenced Start time on site
Shift completed Finish time on site
Total shift hours Total site hours
Activity: Activity: Activity: Activity:
Line Segment: Line Segment:
Line Segment:
Line Segment:
KM from KM to KM from KM to KM from KM to KM from KM to
% of Work Complete
Defects Removed:-
Defects Identified:-
Speed restriction required post daily work:-
Date S M T W T F S Date
Project Project code
Employee Names Hours Position Company
Total USE BACK OF SHEET IF MORE LINES REQUIRED
Plant Operator Name Hours Plant (full description) Company
Additional Plant/Vehicles (not specified above)
Description No. Description No.
4x4 vehicle
Materials
Description Qty Description Qty
Ballast
DAILY SITE DIARY
PROJECT
WEATHER RECORD Temperature
Conditions
Other factors
Industrial
Lost Time
Details of Work Completed:
Geographic Site Issue: eg. In a cutting, bad access etc.
Train Running Issues:
Prepared By Signature
LTI (lost time injury) Yes No
MTI (medical treatment injury) Yes No
FAI (first aid injury) Yes No
SAFETY
DAILY SITE DIARY
WEATHER RECORD Temperature
Conditions
Other factors
Industrial
Lost Time
Details of Work Completed:
Geographic Site Issue: eg. In a cutting, bad access etc.
Train Running Issues:
Prepared By Signature
LTI (lost time injury) Yes No
MTI (medical treatment injury) Yes No
FAI (first aid injury) Yes No
SAFETY
DAILY SITE DIARY