127
STATEMENT Critical- Residential Buildings (Rs. in Lakhs) Name of the (R&B) Division st. No. Name of the Works Unit Amoun t Required (1) (2) (3) (4) (5) Puri 1 S/R to..... S/R to Cottector residence office at puri Such as Painting & Construction of Shed 1 .50 S/R to Res office of Cottector, puri Such as iron stair case, Aluminium door &. compound walt, 3 5/R to Sub-Cotlector Residence at puri Such i*lu,nting & Roof Grading 4 5 Nos 2RB Quarter (Quarter No 2 a ny in I Cotony, Puri 5/R to Hostel Superintendent Quarter of S.C.S Col,tege 5/R to Coltector residence office at puri Such as providing Mosquito Net, Rotter bLind S/R to Collector residence office at puri Such as Painting 11 S/R to Cottector residence office at puri Such as Providing Gate 12 13 S/R to Sub-Cottector Residence at puri Such as Ptastering, flooring & construction of new kitchen etc 14 1 No. C type Quarter of Revenue Department occupied by Puri Municipatity Executive office (Such as construction new gate, Painting, inner road) S/R to..... 2.50 1 l I z.o0 tc 00 o0 1 5 0.70 6 I I I I l I I 7 8 9 0 0.20 3.00 3.00 1 I l I 3.00 2.00 3.00 2.00 1.10 Total= 26.00 Khurda (R&B) Division Office Staff Qtrs (4 nos ) (R&B) Division Office Staff Qtrs (4 nos) i 3.00 t i.oo S/R to 4 Nos. Lectures Quarter (euarter No 'l) of S.C.S Cotl.ege S/R to 4 Nos. Lectures Quarter (euarter No 4) of S.C.S Cottege S/R to E.E Quarter of (R&B) Division, puri S/R to Circuit House Staff Qr.at puri Renovation Staff qtr at LIC Cotony at Khordha (2RB Qtrs) 2.00 l'l E:\C.8.(B)\SPR\2018-19\AMp 2018-19\a.M.p. 2018-1g-01-102018\A.M.p.-Res.Criticot-Res. PC_7/s6 +l 2l l I I

Transcript of S/R to..... S/R to..... t i.oo - Works Department

STATEMENT

Critical- Residential Buildings

(Rs. in Lakhs)Name of the

(R&B) Divisionst.No.

Name of the Works Unit Amoun tRequired

(1) (2) (3) (4) (5)

Puri 1

S/R to.....S/R to Cottector residence office at puriSuch as Painting & Construction of Shed

1 .50

S/R to Res office of Cottector, puri Such asiron stair case, Aluminium door &.

compound walt,

3 5/R to Sub-Cotlector Residence at puri Such

i*lu,nting & Roof Grading

4 5 Nos 2RB Quarter (Quarter No 2 a ny in ICotony, Puri

5/R to Hostel Superintendent Quarter ofS.C.S Col,tege

5/R to Coltector residence office at puriSuch as providing Mosquito Net, RotterbLind

S/R to Collector residence office at puriSuch as Painting

11 S/R to Cottector residence office at puriSuch as Providing Gate

12

13 S/R to Sub-Cottector Residence at puri Suchas Ptastering, flooring & construction ofnew kitchen etc

14 1 No. C type Quarter of RevenueDepartment occupied by Puri MunicipatityExecutive office (Such as construction newgate, Painting, inner road)

S/R to.....

2.50

1

l

I

z.o0

tc 00

o015

0.706I

III

l

II

7

8

9

0

0.20

3.00

3.00

1

Il

I

3.00

2.00

3.00

2.00

1.10

Total= 26.00

Khurda (R&B) Division Office Staff Qtrs (4 nos )(R&B) Division Office Staff Qtrs (4 nos)

i 3.00

t i.oo

S/R to 4 Nos. Lectures Quarter (euarter No'l) of S.C.S Cotl.ege

S/R to 4 Nos. Lectures Quarter (euarter No4) of S.C.S Cottege

S/R to E.E Quarter of (R&B) Division, puri

S/R to Circuit House Staff Qr.at puri

Renovation Staff qtr at LIC Cotony atKhordha (2RB Qtrs)

2.00

l'l

E:\C.8.(B)\SPR\2018-19\AMp 2018-19\a.M.p. 2018-1g-01-102018\A.M.p.-Res.Criticot-Res. PC_7/s6

+l 2ll

I

I

Name of the(R&B) Division

st.

No.

Name of the Works

(1) (2) (3)

Unit

(4)

AmountRequirerr

(s) -

Nayagarh

4 Renovation Staff Qtr at LIC Colony atKhordha (2RA Qtrs)P.W.D. Ministriat Staff Qtrs. at ChristianCoIony

S/R to.....Executive Engineer 1R&B;Division Qtr atNayagarh.

5

1

7.00

1.00

Total= 10.00

1.00

2

i4

5

JE (R&B) No.'l Qtr at Nayagarh.

iiit olrice r Qtr (2nos) at Ranpur.Ir,,r.al

0.50

1.00

1.00

't.00

o.so

0.50

Teachers Staff Qtr (8 nos) at Khandapada.

7

D type (Twin qtr) at Khandapada.

E type Qtr Twin Btock No.l Qtr No.2 atNayagarh.

E type Qtr Twin Btock No.l Qtr No.3 atNayagarh.

8 PWD Staff Qtr No.19 at Nayagarh.

9 PWD Staff Qtr No.20 at Nayagarh.

10 LIC Qtr No.6 at Nayagarh.

0.50

0.50

o.so11 D type Qtr for Judicial Department by

Register

"12Tahasil office Staff Qtr at Daspatla.

13 Tahasitdar Qtr at Daspatta.

0.50

0.50

0.s014 E type Twin Qtr Btock-l at Khandapada.15 D type Qtr of S.C.S at Khandapada.

1.00

o. so

l Total -l 10.00

BBSR No.l Unit-lll 0.4505/R to Qr No IVB-25/4 Unit-lll 500

S/R to Qr No IVB-16/44 S/R to Qr No IVB-42I4 Unit-lll 0

S/R to Qr No 1/2, 2RA-54, IVR-19/1ll-1712 Unit-ll 0.400

S/R to Qr No 2RA-29

1

11

S/R to Qr. No. 2RA - 134 in T.B.press

0

0 500Unit-lll500

5

6

7

8

Unit-llUnit- Il

0.3 50

s/r TO Qr No 2RA-30

S/R to Qr No D-91 BJB AreaS/R to Qr No E-5/3 BJB Area

10 S/R to Qr No E-6l4 BJB Area

BJB Area5/R to Qr No E-5l2i12 S/R to E type Btock Qr No E-2l1 toE-2t6 BJB Area i

13 S/R toQr No IVB-53/1 0.500

9

0.450

o.soo

0.400

0.400

0.400

1.000

2

3

E:\c E.(B)\SPR\2118 19\aMP 2o1a B\A.M.p. 2018-19-O1-1e2o1B\A.M.p. Res.Criticot-Res

Unit-lll

Pg-2/s6

j

l

Name of the,. \rB) Division'' (1)

Unit AmountRequired

5t.No.

Name of the Works

(4)(2) (3) (5)

Museum AreaS/R to Qr. No. D - l2l

S/R to Qr No IVA-48/6

S/R to Qr. No. Vlll-D/S-1

5/R to Qr. No. E - 1/5S/R to Qr. No. D - 58

S/R to qr. No. D - 122

Unit-lll 0.500

0.500

350

500

0

0

lI

I

l

l

0.450

Museum Area

Unit-lll

BJB Area

BJB Area

Museum Area 0.700

Unit-llUnit-lll

-

Unit-llUnit-ll

0.350

0.350

0.500

0.500

0.600

14

15

:lO

i!/R5/Rs/R

tototo

Qr No VR-1/2

Qr No VR-4/1

Qr. No. Vll R 1

Unit-ll0nit-ttunlt-tir

0.500

0.500)

0.500

o. soo

0.500' o.roo

17 SIR to Qr No VlllMR-4

I

I

Unit-V

18 iS/R to VIIMR-2 Unit-V

ttnit- tt19 r5lR to Qr No IVR-32/1

70 S/R to Qr No VA-10i4 Unit-ll 0.800

o.roob.not

1 z'r S/R to Qr. No. IVB - 22i 3 Unit-lll

?z S/R to Qr. No. IVB - 3211 Unit-lllUnit-lll 0.500

TBP CotonySatyanagar

I oiso

25 ls/R to Qr. No. lvR - 11l3 Unit-llUnit-lt

0.400I--

26

27

S/R to Qr. No. 2RA - 41 0.350

0.4005/R to Qr. No. IVB - 2414 Unit-lll

z8 S/R to Qr. No. 5RF - 3 Unit-lll 0.500

29 S/R to Qr. No. VR - 6/2 Unit-lll 0.500

30 5/R to Qr. No. 4R - 1 11 to 1 12 Unit-lll 0.500

31 S/Rto Ama Odisha Sambad officefunctioning at O No 4R'1 / 1 to 1 12

32 S/R to Qr. No. Vlll D/S-1

33

34

35

36

37

i3839 5/R to Qr No 2RA-48

40 5/R to Qr. No.2RA-47

41 S/R to Qr No 2RB-S/5-8

23 5/R to Qr. No. 5RF - 7

24 S/R to Qr No 2RA-23

43

Museum Area

Unit-lllBJB Area

S/R to Qr No 2RB-5/5-9

S/R to qr. No. Vlll-D/S-2l2S/R to Qr. No. 3R-10

S/R to Qr No ll-19/2

0.500420.500

I 50 iS/R to Qr No 2RA-49

S/R to Qr. No. IVB - 40/3

Unit-llUnit-lll

5/R to Qr No ll-1614

+

54

52

53 0.500

49 S/R to Qr No llR-3/7

47 S/R to Qr No E-111, PWD Cotony

48 S/R to Qr. No. IVB - 5/1

45 S/R to qr No ll-9/446 5/R to Qr No 2RA-10/7

51 l5/R to Qr No IYA-6/812

0.500

0.400

0.700Unit-llKalpana Area

Satyanagar

Unit-lll0.400

0.500

Unit-llUnit-ll

44

Unit-llilnit-tt

0.350

i o.aoo

0.400

0.350

I

[,i

E:\C.E.(8)\SPR\2018-19\AMP 2018-19\A.M.P. 2018-19-01-1O2018\A.M.P.-Res.CtiticolRes Pg_3/so

I

I 0.500

(1) (2) (3)

AmountRequired

(s) --

Name of the(R&B) Division

st.No

Name of the Works

S/R to Qr. No. IVR-31/1s/r TO Qg No VIB-3/2

Unit

(4)

Unit-llU nit- I ll

0.450

0.500

0.500

0.500

0.500

osoo0.500

0.450

500

700

55

56

,5758

59

60

,64+

65

Unit-llUnit-ilU nit- li

unii-itUnitllUnit-ll

1S/R to Qr.

,18 t" q.S/R to Qr.

No. VA - 21l3No. IVA - 14l4No. Vl-DiS-1l1

S/R to Qr No IIRPF-6/7

I !1 1s/RtoQr No IVR-17/1

62 5/R to Qr. No. VA - 4/2

i63 S/R to Qr. No.lVA - 214/1S/R to Qr. No. IVA - 2911

Unit-llUnit-tt

ozso

S/R to Qr. No. VA - 33/366 isi R to Qr.No. tvR - 2/1

Unit-ll0

0

o

1

Unit-llUnitf l

400

000

Unit-lll 0.400"67i

5/R to Qr. No. ll - 13/1 to ll - 13/6

,68 S/R to Qr. No. ll - 1913

S/R to Qr. No. Type-ll-7/4 Unit-lll', 1

Unit-lllS/R to Qr. No. IVB - 36/40.300

0.900

o.soo

0.s00

osoo

71 5/R to Qr No VR-6/1

72 s/r TO Qr No ll-616Unit-lllUnit-lllUnit-lllUnit-ll

73 5/R to Qr. No. IVB - 3213

74 S/R to Qr. No. IVA - 7/1L

0.50075 S/r to Qr. No.2RA - 1/5 lriatpana Area

A{useum Area0.500

)r9 Si R to Qr. No. F - 1/6

Unit- ll

0.350

o.4oo77 5/R to O. No. ll - 4/378 S/R to Qr. No. ll RPF - 7/47_? S/R to Qr. No. VA - 4/1

Unit-llUnitrl

0.400

0.50080 s /R to Qr. No. F - 24 in T.B.press T.B. Press 0.21081 S/R to 2RB-D/S-Qr No 2RB-F-2 /1 to218 l(atpana Area82 S/R to Qr No IVR-I3/183 S/R to Qr.No. ll RPF - 6/884 5/R to Qr. No.2RAF -611

85 S/R to Qr. No. 2RB - 1/486 5/R to Qr. No. 2RB - 7/1187 S/R to Qr. No. 2RB - 5/288 S/R to Qr. No. 2RB - 4/10

Katpana Area 0.400

Katpana Area

Unit-llUnit-ll

0.500

0.500

0.800

0.500

0500Katpana Area

Katpana Area 0.5t0Katpana Ar 0.500

r89 S/R to Qr. No. 2RB - 790 iS/R to Qr No ll-25l4

/vluseum Area 0.400

91

izS/R to Qs No IVB-9/4S/R to Qr No ll-9i 1

Unit-lll 0.500

0.500

0.300

0.400

Unit-lllu;it-r

93l)94

itl*," Qr No IVA-17119l2 Unit- ll

Unlt- ti 0.500S/R to Qr No VA-18/195 s/r TO Qr No IVA-14I3

96 Qr No IVA-I 1/3

Q.r. No.zRB - 1/1

Unit-ll 0.400

0.400

0.500E:\C.8.(B)\SPR\2o18 1g\AMP 201&19\A.M.P.-2018 19-01-lc201B\A.M.p. Res.criticol-Bes

Unit-llUnitJi

Pg_4/s6

69

)to

97

5t.No.

Name of the Works Unit Amou ntRequ'ired

Name of the'2&B) Division

(1) (z) (3) (4) (s)

108

S/R to Qr. No. IVA - 26128/5

S/R to Qr. No. IVB - 38/4

5/R to Qr. No. ll-716

107

0.500

0.300

Unit-llUnit-lllUnit-lll

Unit-lll

Unit-lllUnit-lll

0.500

0.570

0.500

o.ioo

Unit-lll 0.500

Unit-lll

Unit-lllUnit-lll

0.400Unit-lllUnit-lll

0.800

0.400

0. s00

o.aoo

Unit-lll120 Unit-ll

Unit-lll

T.B. Press

Satyanagar

0.900

0.500

0.400

0.250Unit-lll

126

S/R to Qr No IVB-13/3 and 1314

S/R to Qr. No. IVB - 21l'lS/R to Qr. No. IVB - 1911

5/R to qr. No. ll - 1215127

128

179

98 Si R to Qr. No. ll99 S/R to Qr. No. ll

- 19 t5 &. tYR-21 I 4 Unit-llUnit-il

0.300

o.4oo0.400

- 13/5 &.8/1100 S/R to Qr. No. 1R - 1 Unit-ll101 5i R to Qr. No. ll - 8/1 Unit-ll

Unit-ll0.350

102 S/R to Qr. No, VA - 14/4 0.400

o. ioo103 iS/R to Qr No IVA-37 /39/4 U nit- ll104 S/R to Qr No D-93 BJB Area 0.500

o.aoo105 i5/R to Qr. No. IYA - 11/2 Unit-ll106 S/R to Qy No VR-6/12 Unit-lll 0.300

109

110 5/R to qr No 2RB-23

111 5/R to Qr. No. IVB - 2211

112 5/R to Qr. No. ll-2912

113 S/R to Qr. No. IVB - 28/2114 S/R to Qr. No. IVB - 2913

115 S/R to Qr No IVB-10/1

116 S/R to Qr No IVB-2I4

117 S/R to Qr No ll-'1415

118 S/R to No 5RF-8

119 S/R to Qr No 5RF-12

S/R to Qr.No. lV - 1/1121 5/R to Qr. No. 2RA -55 & F-15 of T.B.Press,

Satyanagar

122 S/R to Qr No IVB-3/4

123 5/R to Qr. No. IVB - 36/3124

125

S/R to Qr. No. IIRPF - 11l25/R to Qr No G-30 Unit-lll

I o.iso

0.500

Unit-ll

0.600

0.450Unit-lllUnit-lllUnit-lll 0.500Unit-lll I 0.s00

0.3 50130 S/R to Qr No IIRPF-11/3

1 3 1 5/r to Qr. No. IVB - 8/3132 S/R to Qs No G-13 Museum Area 0.800

0.600

0.700

Unit-llUnit-lll

138 iSi R to Qr No D-113 and 114

133 S/R to Qr. No. G - 27

r 139 S/R to Qr. No. IVR - 31/2

134 5/R to Qr No 3RF-5/3

i 136 S/R to Qr No 2R-3

137 5/R to Qr No 3R-5/5-12

135 i5/R to Qr. No. E-1 Museum Area i

Unit-ll i 0.500

0.300

0.500

Unit-lllKatpana Area 0.400

0.500

0.500

r.ooo

\, r,

E:\C. E.(B)\SPR\2018-19\aMp 2018-19\A.M.p.-2018 19 O1-10-2018\A.M.p.-Res.Criticat Bes. Pg_s/s6

!utvqlggg,BJB Area

Museum Area

\q

-

Name of the(R&B) Division

st.No.

140 S/R to Qr No VlllMR-l141 5/R to Qr. No. IVB- 4412147 S/R Vto Qr No 2RA-33

143 S/R to Qr No IYA-27/6144 StR to Qr. No. IVA-35/6

I 145 S/R to Qr. No. V|-D/S-1l1S/R to M.T. Qr. No.VA-11/4

147 S/R to Q5. No. 2RA-2l7, 2RA-5/12 & 2RA-5/11

148 2RB-5/ 1

149 2RA-10/ 11

150 2RB-4t7

151 S/R to Qr. No IVA-20/2152 S/R to Qr. No. IVA-24/5

146

Unit

(4\

Unit-ll

] Katpana Area

1.000

0. s00

0-500

0.500

0.500

0.500

o. soo

0.350

Unit-VU n it- lllU nit- ll

Unit-iiUn it- llIUnit-ll

l(atpana Area r 1.000

i (aLpana Ftat 0.400Katpana F[at

Unit- ll0.300

osooo.5ooi Unit-ll

Name of the Works

(1) (2\ (3)

155

156

157

158

162

167

169

170

171

172

173

153 5/R to Qr. No. B-2

154 S/R to Qr. No. VA-27l'lS/R to Qr. No. VA-8/3S/R to Qr. No. IVA-42I5

S/R to Qr. No. IVA-2/4/5S/R to Qr. No. IVA-9/1

159 S/R to Qr. No. D-74

160 S/R to Qr. No. 'lR-18

161 5/RtoQr. No. IVA-5/1

5/R to Qr. No. A-3

163 5/R to Qr. No. VA-5/2164 S/R to Qr. No. VR-3/1

165 S/R to Qr. No 2RA-2l4166 S/R to Qr. No. IVA-36/1

S/R to Qr. No. VA-11/2168 S/R to Qrs. No. IVB-24I2

S/R to Qrs. No. IVB-20/4

5/R to Qrs. No. IVB-19/2

S/R to Qrs. No. IVB-29I4S/R to Qrs. No. IVB-44/3

S/R to Qrs. No. IVB-38/1

(s)-

AmountRequire.i

BJB Area

Unit-ll0.500

0.500Unit-ll 0.500Unit-ll ' 0.500Unit-il T osooUnit-ll 0.400

BJB Area 0.500-- 1.

BJB Area i 0.500

Unit-ll 0.500BJB Area

Unit-ll0.500

0.s00Unit-ll 0.500

llatpana Area

Unit-llr 0.500

: 0.s00Unit-ll 0.500

Unit-lll 0.500

osooUnit-lllUnit-lll 0.500Unit-lllUnit-f f f

U nit- lll

0.500

0.s00

0.500174 Si R to Qrs. No. IVB-23/4175 S/R to Qrs. No. IVB-18/2176 S/R to Qrs. No. IVB-20/3177 S/R to Qss. No. IYB-2911&29/2178 S/R to Qrs. No. IVB-15/1

179 5i R to Qrs. No. IVB-29/1

180 Si R to Qrs. No. IVB-1/1

181 S/R to Qrs. No. IVB-44I1E:\c.E.(B)\sPR\2o18 19\AMP 2018-19\A.M.p.-2018 1s O1-1c2o1B\A.M.p.-Res.Criticot Res Ps_6/s6

Unit-lll i

Unit- Ill

_u-I!llUnit-lll

0.500

0.400

0.3s0

lI 0.500Unit-lllUnit-lll

0.900

0.500

0.600

0.600

Unit-lllUnit-lll

)

Name of the Works u nrt Amoun tRequired

t)Nanre of the {'

1t'ts) Division

5t.No.

(5)(4)(2) ( )J(1)

[-o.sbo0.500Unit-lll

Unit-lll0.400Unit-lll

5/R to Q.rs. No. IVB-39/1

S/R to Qrs. No. IVB'3/2

5/R to Qrs. No. ll-13/1

0.500

0.500

0.500

Unit-lllUnit-lllUnit-lll20s

S/R to Qrs. No. IVB-30/4

SIR to qrs. No. IVB-33/3Unit-lll 0.500

Unit-lllUnit-lll

0.700

0.500

S/R to Qrs. No. IVB-52/2208

206

207

5/R to Qrs. No. IVB-49/4209 Unit-lllUnit-lll210 5/R to Qrs. No. IVB-16/1Unit-lll

5/R to Qrs. No. IVB-9/1

5/R to Qrs. No. IVB-8/1

Sln to Qrs. No. IVB-30/2

Igz sln to Qrs. No. lvB-1 7t2 Unit-lll 0.400

unit-tit 0.500

untt-itt 0.800

-unit-itt-l o.5oo

Unit-lll 0.800

unrt-iir , o.ooo

183 Si R to Qrs. No. IVB-26/3

184 rS/R to Q.rs. No. IYB'7 l7,+185 S/R to Qrs. No. IVB-49/3

184 ;S/R to Qrs. No. IVB-3/3

187 S/R to Qrs' No. IVB-7012Unit-lllGtt-ttt

o. soo

0.400

i.soo

188 SIR to Qrs. No. IVB-15/3

189 iS/R to Qrs. No. IYB-4717

I

i

I

1

190 islR to Qrs. No. IYB'4611 Unit-lllUnit- lll

191 iS/R to Qrs. No. IVB'2311 0.700

192 lS/R to Qrs. No. lvB'2714 Unit-lllUnit-f f f

0.600

o.6001 /R to Q.rs. No. IVB-27I2

194 S/R to Qrs. No. IVB-23/2 Unit-lll 0.500

0.500195 S/R to Qrs. No. IVB-5/2 Unit-lll

1 96 S/R to Os. No. IVB-10/2 Unit-lll 0.s00

197

198

199

200 S/R to Qrs. No. IVB-22/4 Unit-lll 500

201 S/R to Qrs. No. IVB'51/2 Unit-lll 500

o.aoo1zz is/R to Qrs. No. IYB'612 Unit-lll

203 5/R to Qrs. No. IVB-52/4

2M S/R to Qrs. No. IVC-6/1

S/R to Qrs. No. IVB-26/3

0.500

0.500

211 5/R to Qrs. No. IVB-4/3 0.400

212 Unit-lll 0.400

213 Unit-lll 0.300

214 Unit-lll 0.300

215 5/R to Qrs. No. IVB-21 /2 &.2113 Unit-lll 0.190

216 S/R to Qrs. No. IVB-3/1 Unit-lll 0.400

0.450-+I 217 lS/R to Qrs. No. IVB-14/1 Unit-lll

218 Sln to Qrs. No. IVB-11/3 Unit-lll 0.700

0.450

o.so-I

l219 S/R to Qrs. No. IVB-7/3 Unit- lll

r"rnlt- ttt,220 S7R to Qrs. No. IVB-41 /3

S/R to Q.rs. No. IVB-36/ 2 Unit-lll 0.350

0.600271

222 S/R to Qrs. No. IVB-49/2 Unit-lll

223 S/R to Qrs. No. IVA-34/6 Unit-ll 0.600

S/R to Qrs. No. IVB-2512 0.s50,224

Unit-lll

E : \C. 8. ( B)\S P R\20 1 8 - 1 g\AM P 20 1 8' 1g\A M P.' 2O7 8' 19' 0 1' 10 207A\A M. P " Res'Criticol-ResPg-l /s6

l

t

jlr Name of the(R&B) Division

(1) (2) (3)

SI Name of the WorksNo.

275 SIR to Qrs. No. IVB-47 l4226 SIR to Qrs. No. IVB-45/1

227 S/R to Qrs. No. IVB-39/3

228 S/R to Qrs. No. IVB-4213

229 S/R to Q,rs. No. 2RA-1, PWD statt qrs.

230 S/R to Qrs. No. E-2 PWD Cotony

231 S/R to L.T. Qrs. No. 2RA-54 of Text BookPress Staff Qrs.

Un it

(4)

Unit-lllunit- ttt

Satyanagar

AmountRequired

(s) -'Unit-lllU nit- lll

0.600

0.500

KaIpana Area

IBP CotonySatyanagar

Satyanagar

0.500

0.500

0.600

o. soo

0.400

232 S/R to Qrs. No. 2R-1 of PWD staff Qrs.233 S/R to L.T. Qrs. No.S-4 at lB234 S/R to L.T. Qrs. No. llR-8, at lB premises,

735 5/R to L.T. Qrs. No. 3RE-2/5, SCRB

236 s/ R to L.T. Qrs. No. Zna-tfS of fexi eoo[;Press Staff Qrs.

lsrn toI

iPress,

237 L.T. Qrs. No. 2RA-37 of Text Book

238 S/R to staff Qrs. No.3RE-19 in T.T.l cotony

239 5/R to Qrs. No. IVB-19/3

240 5/R to Qrs. No. IVB-51/4

241 S/R to Qrs. No. IVB-8/4

242 S/R to L.T Quarter No.lVB-30/2

Unit-lllSatyanagar

Satyanagar

TBP Cotony i

Satyanagar

TBP CotonySatyanagar

T.T.t.Laxmisagar

tinit-tit

0.500

o.:ooo.aso

0.650

o.5oo

0.500

0.800

0.500

i Unit-lll 0.300

0.500

b.soo

unit-lltUnit-lll

243 5/R to L.T Quarter No.ll-12l2 0.350244 S/R to L.T Quarter No.ll-18/6 0.700

S/R to L.T quarter Type-2RB-7,11-2715 &ll- Unit-lll 0.90010t1

246 S/R to L.T Quarter No.ll-10/4 Unit-lll

Unit-lllUnit-lli

245

247 S/R to L.T Quarter No.ll-10/2 Unit-lll0.350

0.450

249

250

251

252253

248 S/R to L.T Quarter No.ll-12l3S/R to H.T quarter No.VlllD/S-2S/R to L.T Quarter No.lVB-16/2

S/R to H.T Quarter No.G-69

Unit-lll I 0.500

1.000

900

Unit-lll- unti-rir 0

S/R to L.T Quarter No.2RB-13&, 14-lBtock Unit-lll 1.000

5/R to L.T Quarter No.ll-13/3 Unit-lll T

254 iS/R to Quarter No.2RB-21&22 =1 Btock Unit-lllUnit-lll

0.700

b.iooo.soo

0.500

0.500

255 S/R to L.T Quarter No.ll-2615256 S/R to L.T Quarter No.ll-18/1 to

18/6='l Btock

257 iS/R to H.T Quarter No.4R-4l1258 S/R to L.T Quarter No.ll-15/1 to'15/6 =1

Block

Unit- lllf- _Unit-lll

IUnit-lllunlt-l tt

0.500

1.000

E:\C.8.(B)\SPR\2018-19\AMP 2018 19\A.M.P.-2O1&19-01.10-2018\A.M.p.-Res,CtiticotRes. PB_8/s6

5t.No.

(5)(4)2( ) (3)

Narne of the(l' 'B) Division'- (1)

768

274

275

776

277

278

2RA-72, Govt. Press

2RA-99, Govt. Press

1

5R-4

vil-2

S/R to.....

3

4

vilc-s

5R-7

YtA-411

6 Ytc-7 t27 vtA-1 t 1

vtA-3/18

759

760

761

S/R to L .T Quarter No.ll-20/6

S/R to M .T Quarter t'toVR-tOlt

S/R to L .T Quarter No.Zng-Zt

Unit'lll0nit-ittUnit-lllUnit-tttunit-ttt

0.500

0.400

0.400

0.3 50

0.500

0.400

262 5lR to L .T Quarter No.ll-9/1

263 5/R to L .T Quarter No.ll-16/5

264 S/R to L .T Quarter No.ll-1214 Unit-lll

265 5/R to L .T Quarter No.ll-3/6 Unit-lll 0. s00

o.5oo

0.25066 S/R to Qr No-tYPe-ll'9, 11 &- 12 Unit-V

Unitf t267 tvA-1/6tvA-9/6 Unit-ll

l

II

0.400

0.400

o.aoo269 tvA-38/ 1

Unit-ll

270 zRA-26 Unit-ll

271 2RB-S/S-11 Museum Area 0.350

272 lRF-416 Kalpana Area 0.300

I ztt vR-8/1 Unit-lll 0.750

5/R to Qr. No. ll- 2612 Unit-lll 0.470

tvB-213 &25/3 Unit-lll 0.250

o.nob2RA-110, Govt. Press Unit-lllUnit-lll 0.500

o.+ooUnit-lllTotal = 139.050

BBSR No.ll2

5

9

10

vll-4

vilt-3vilc-2 Unit-1

Unit-111

Unit-1 0.337

Unit-1 4.556

Unit-l | 4.931

Unit-1 '' 1.47O

Unit-1 3.998

Unit-1 0.851

Unit-1 0.681

Unit-1 0.317

Unit-1 3.471

-4-&]52.220

12 rvR-8/3 Unit-1 0.398

13 tY-2011 Unit-1

Unit-1

0.396

14 tv-46t1 2.290

1 5 tv-3212

tv-3/ 1

Unit-1 0.398

z.loto.+lq

16 Unit-1

17 \tv-21 t2 Unit-1

18 tv-50/2 Unit- 1 0.397

0.598

0.800i19

20

tY-2614

zna++

Unit-1l

I

Unit-1

I 21 l2RA-3 0.783Unit-1

Name of the Works Unit rljAmountRequired

E:\C.E.(B)\SPR\2018-1g\AMP 2018-1g\A.M.P.'2018-19'01'1G2018\a.M P''Res Ctiticol-ResPg-9/s6

I

i

Name of the(R&B) Division

SI

No.

Name of the Works Unit

14)

Ulit-1lJnit-1u1i!-1Unit-1

Unit-'l

2 2RA-343 l2RA-14

, 44, 47 &. ilR-3/3

21 r\tleqqlt qtrs 3nos

25 12RA Qtrs (Adivasi Ground)

26 lR 8nos (Adivasi Ground;

22

(1) (2) (3)

AmountRequire<l

(s) -

27

t28llR-1i 9

+

lllR-6/ 2

29 |R-4t4 &. ilR-4t6

Unit- 1

Unit-1

0.3961.0600.9000.800

1.600

o. iaso. rsz0.386

oJ964.369

o.4oo

Unit- 1

30 ilR-1/8

31 viltc-1Unit-1

Unit-'l32 lvB-st4 Unit-1

Unit-1 0.400

ossoq.a4o

33 tv-32t4

l34 lvR-6s

35 6R-2

Unit-6

Unit-636 vtR-3

37 G-50Unit-6 4.906

o.looUnit-638 VIMR-6

39 G-10 & G-49

40

41 F-35

42 F-40

43 ilR-152

F-24

ilR-88

46 il R-135

47 ltR-134

tvR-70

rvR-327

50 tvR-117

lvR-134

rvR-169

tvR-261

IVR-5

55 tvB-zt4Type-llR-5, PWD Cotony

lvR-139

R-297

itF

Unit-6unii{Unit-6

4.7850.530

0.463

0.2400.513

o.:al

Unit-6Unit-6

Unit-6

Unit-6 0.441

Unit-6 l 0.330

o.izzo3i2

Unit-6

T'Unit-6Unit-6 0.244

0.500Unit-6Unit-6 0.402

---_l-Unit-6 0.588

Unit-6 __Unit-6 i

1.500

oiiUnit-6 0.261

0-350Unit-6Unit-6 0.400

o.iooo.soo

0.500

Unit-6

Unit-6Unit-6R-172

44

45

48

49

52

51

53

54

56

57

I

L

60 rvR-66 Unit-6ffnlt-O

0.360

o.eoo

0.3 50

61 tVR-173

62 tvR-240 Unit-663lrvR-2354 tvR-316

Unit-6Unit-5

0.450

oToo6

E.\C.E.(B)\SPR\2O18-19\AMP 2018-19\A.M.p.-2O18-19 01 1a2018\A.M. p.-Rer.Criticot-Res Pg_1o/so

58

59

Unit AmountRequired

(2) (3) (4) (s)

Name of the

a"l&B) Division

(1)

st.No.

65 tVR-19

Name of the Works \

r Unit-6Unit-6

Unit-6

1.000

1.000

0.400

66 tVR-273

67 tvA-241

68 IVA-268

69I

70

F-2l1 PWD Cotony

llR-20, PWD Cotony

Unit-6

Unit-7500

s00

0

0

o

400Unit-6

71 F-9

72 2R-2/ZUnit-7 0.350

o.aoo

o.ioo73 2R-2/3

74

jt

Unit-1- rotir

_!rcllt.gSIRC Vittage

0.400

80.80

0.s00.50

l:a

BBSR No.lllIRC Vittage 2.50

2

4 Qtr. No F-5/9 Rental Colony 0.35

Rentat CoLony i 0.35

RentaI Colon v 0.30

RentaI Cotony 0.35

RentaI Colony 0.35

IRC Vittage 0.35IRC Viltage 0.35

Rentat Cotony; 0.35

RentaI Cotony 0.35

r. No F-5/12

6 Qtr. No F-41l9

7

8

9

10

11 Qtr. No F-25l4

12 Qtr. No F-24/12I

i

1l

2RA-61

S/R to.....Btock No F-11

Qtr. No F-98

Qtr. No F-88

1

Qtr. No F-35/5

Qtr. No F-34l9

Qtr. No F-265

Qtr. No F-280

13 Qtr. No F-l80 BqlrqseIRC VittageQtr. No F-173

0.3s

0.3515 qtr. No F-I7l7 RentaI Colony 0.3s

16 Qtr. No F-151 IRC Vittage 0.3sRentaI Cotony 0.40

17 Qtr. No E-9l4

18 Qtr. No E-80

Qtr. No E-6l2

70 Qtr. No E-41 /4

L

91

IRC Vittage 0.40Rental Colony: 0.40

0.40

E.\C.8.(B)\s PR\2018-19\AMP 2018-19\A.M.p.-2018-1g-01-1G2O1B\A.M.p.-Res.Ctiticol-Res

Rental Cotony ,

Pg_17/s6

14

Unit-1 :

Unit-1 l

I

$ Name of the(R&B) Division

st.

No.

2'1 Qtr. No E-3616

22 QLr. No E-33/6

23 Qtr. No E-17

Name of the Works Unit

Rental Co[ony 0.40

Rental Cotony 0.50

5024

ii26

9!..r9!|..iQtr.

50

50

50

0.40

o.60

No E-2l2

uo r-ittNo G-55

IRC Vittage

UNIT-VIII

wrr-vilUNIT-VIiI

0

o

0

027 Qtr. No 2RA-21/8 uNtT-vil

lFlental colony

Flentat cotony I

28 Qtr. No D-9l5

l2e Qtr. No D-7l5 0.60

0.60

0.60

T30 Qtr. No D-7 ayadev Vihar

3 1 o D-213

32 Qtr. No D-11

P.ental cotony r

Jayadev Vihar 0.60

0.60J

34

3 Qtr. No D-10/6

Qtr. No D-10/1

RentaI colony

llentaI cotony-1

35 Qtr. No C-21

0.60

2.00

2.00

1.65

Qtr. No 8-6IRC Vittage

IRC Vittage

IRC Vittage37 Qtr. No B-4

38 Qtr. No E-31, Btock-6 CRP Square 0.40

0.3539 Qtr. No F-34112 CRP Square40 Qtr. No FR-9419

41 Qtr. No FR-68/4

42 Qtr. No FR-66/2

43 Qtr. No FR-63/4

Qtr. No FR-44/1

45

46Qtr. No FR-39/5

Qtr. No FR-3717

Qtr. No FR-28/11

48 Qtr. No FR-26/12

49 Qtr. No F-6l7

C.S.Pur1-

C.S.Pur

C.S.Pur

C.S.Pur

C.S.Pur

C.S.Pur

0.35

0.3s

o.3s

o.it0.35

o.3s

I

-l

C.S.Pur 0

C.5.Pur

C.S.Pur -

35

0.35

o.ls

IL

Il

50'54 Qtr. No FR-98/8

Qtr. No C-39

52 Qtr. No 2RB-814

53 Qtr. No F-9, DPI Cotony

54 Qtr. No 2RA-15/6

C.S. Pur

C.S.Pur

IRC Vittage i

UNITryIII' I

UNIT-VIII

uNir.yrrr

0.35

0.35

z.soo. so

0.50

o.4o

(1) (2) (3) (4) (5):-.

AmountRequirerr

55 Qtr. No T-8/1256 LQtr. No znn-5lsI+

UNIT.VIII

uNtr-rltilUNIT-VIIi

0.40

0.35

0.3s57 Qtr. No Il RA-50/4

E:\C.E.(B)\SPR\2O18 19\AMP 2O18-19\A.M p.-2O18-19-O1-102018\A.M.p..Res.Critjcol-Res

UNIT-VIII

PE_t2/s6

58 rQtr. No E-'168 0.35

,36

44

st.No.

Name of the Works Unit AmountRequired

(z) (3) (4) (5)59 Qtr. No E-'106

Qtr. No F-82UNIT-VIII 0.35

0.35

0.35

0.35

0.35

0.35

0.35

0.35

60 UNIT.VIII61 Qtr. No F-23

Qtr. No T-9l3

Qtr. No FR-66/6

UNIT.VIII62 Rentat cotony

63 C.S. Pur64 Qtr. No FR-63112 C. S. Pur65 Qtr. No FR-59/10 C.S.Pur66 Qtr. No FR-50/10 C.S.Pur67 Qtr. No FR-38/11 C.S. Pur 0.3568 qtr. No FR-27/10 C.S.Pur 0.3569 Qtr. No FR-25/3 C.5. Pur 0.3570 Qtr. No FR-18/10 C.S. Pur 0.3s71 Qtr. No FR-103/2 C.S.Pur 0.3s72 Qtr. No FR-87/11 C. S. Pur 0.3073 Qtr. No FR-87/7 Sailashree

Vihar0.30

74 Qtr. No F-4o111 SaitashreeVihar

0.40

75 Qtr. No E-26l1 RentaI cotony 0.4076 Qtr. No E-25l3 RentaI cotony 0.477 Qtr. No T-5l2 Rental cotony 0.3078 Qtr. No F-34110 Rental cotony 0.30 .

79 Qtr. No F-20 UNIT-VIII 0.4080 Qtr. No D-4l1 UNIT-VIII 0.6081 Qtr. No D-12l5 UNIT.VIII 0.6082 Qtr. No 3/4, N.k.Apartment UNIT-VIII 1.0083 Qtr. No 2RBF-7(PC) UNIT-VIII 0.4084 Qtr. No 2RBF-20(PC) uNlT-vilt 0.4085 Qtr. No 2RB-7/4 UNIT-VIII 0.4086 Qtr. No 2RB-16/8 UNIT-VIII 0.4087 Qtr. No 2RA-6/6 UNIT-VIII 0.3088 Qtr. No 2RA-5/6 UNIT-VIII 0.3089 Qtr. No 2RA-13 (Road-C) UNIT.VIII 0.4090 Qtr. No 2RA-1218 UNIT-VIII 0.4091 Qtr. No 2RA-1114 UNIT-VIII 0.4092 Qtr. No 2R-9 (Road-C) UNIT-VIII 0.4093 Qtr. No T-4l2 UNIT-VIII 0.4094 Qtr. No T-1112 UNIT-VIII 0.4095 Qtr. No F-54 UNIT-VIII 0.40

UNIT-VIII 0.4096 Qtr. No F-5

97 Qtr. No F-43

98 Qtr. No F-4l4 UNIT-VIII

t-Ai

tr'Name of the

_ (R&B) Division

(1)

E:\C-E-(B)\SPR\2018-1gVMp 2018-19\A.M.p.-2018-1941-lG2018V_M.p._Res.Criticol-Res Pc_t3/e6

4(

Qtr. No G-137

Qtr. No G-135

Unit Amou ntRequired:

(4) (5)

UNIT-VIII

UNIT-VIII

UNIT.VIII

UNIT-VIII

UNIT-VIII

UNIT.VIII

UNIT-VIII

uNtT-vilUNIT-VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII 0.35

UNIT.VIII 0.35

UNIT-VIII

UNIT.VIII

st.No.

Name of the WorksName of the(R&B) Division

(2) (3)(1)

102

104

105

106

107

D-4t3

D-2/2

D-5/6Qtr. No

Qtr. No

Qtr. No

0.60108 Qtr. No D-2l1

109 Qtr. No C-68 1.00

110 1.00

111

c-59

c-48Qtr. No

qtr. No 1.00

117 Qtr. No C-44

113 Qtr. No C-35

1.00

1.00

1.00

114 Qtr. No C-30

115 1.15

1.00116

c-27

c-16Qtr. No

Qtr. No

117 Qtr. No ZRB-7/6 0.50

0.50118 Qtr. No 2RB-417

119 Qtr. No 2RB-418 0.40

0.50120 Qtr. No 2RB-16(PC)

1 2 1

99 Qtr. No F-37 t8 UNIT-VIII 0.30l

100 Qtr. No F-3/9 UNIT-VIII 0.40

0.40

0.40

101 Qtr. ryqlF-3 / 18

Fau6UN IT.VIII

Qtr. No UNIT-VIII

103 Qtr. No F-199 UNIT-VIII 0.40

Qtr. No E-18/4 UNIT.VIII 0.35

UNIT-VIII 0.60

UNIT-VIII 0.60

UNIT.VIII

ut\llT{/lll-0.60

UNIT-VIII

uNlr-viltUNIT-VIII

UNIT.VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII

UNIT-VIII

uNtT-vilUNIT.VIII

UNIT.VIII

UNIT.VIII

Qtr. No 2RB-15/3 UNIT-VIII 0.50

0.50122 Qtr. No 2RA-8(PC) UNIT-VIII

123 Qtr. No 2RA-34/2 0.30

0.30124 Qtr. No 2RA-32(Road-B)

0.30125 Qtr. No 2RA-31(Road-C)

0.30126 Qtr. No 2RA-30(Road-C)

0.30127 Qtr. No 2RA-3/3

0.40128 Qtr. No 2RA-21(Road-D)

Qtr. No ZRA-Z(3129 0.40

0.30130 Qtr. No 2RA-2/20.30I 3 1 Qtr. No 2R -14/30.30132 Qtr. No 2RA-10/5

0.30133 Qtr. No 2R-42(Road-B)

134 Qtr. No 2R-4(Road-B) 0.30

135 0.30Qtr. No 2R-2

0.35136

137

138 Qtr. No G-58

1R-6

1R-40

Qtr. No

Qtr. No

139 0.35

140 0.35

141 Qtr. No G-1'18 0.35

E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P. 2O18-19-01-10 2018\a.M.P. Res.Ctiticol-Res.

UNIT.VIIIPE_1,4154

Name of the(R&B) Division

(1):l

st.No.

Name of the Works Unit AmountRequired

(2) (3) (4) (s)

E-114156 Qtr. No

154

1 5

Qtr. No 2RA-36/5

r. No F-37

157

158

159

Qtr. No 1R-2

Qtr. No 2RB-115

Qtr. No 2RA-811

0.35

0.40

0.40

UNIT.VIII

UNIT.VIII

UNIT.VIII

160

161

162

Qtr. No 4R -1412

Qtr. No-2RA-48/4

Btock Qtr. No C-21

0.40

0.45

2.00

UNIT.VIII

UNIT.VIII

UNIT-VIII

163

164Qtr. No-2RA-2/5

Qtr. No-1R-9

165

142 Qtr. No F-77

F-4/6F-3

UNIT.VIII

UNIT-VIII

uNrr-tilt

0.35

0.35

0.35

'143 Qtr. No

144 Qtr. No

145

146atr. !gQtr. No

Qtr. flo

F-3/5

F4i'E-6/Z

UNIT-VIII

Uuii-vrrr0.35

o.h0.40147 UNIT-VIII

:148 Qtr. No E-48

E-40

UNIT-VIII 0.35

0.40

0.35

: lqg Qtr. No UNIT-VIII

UNIT.VtIIQtr. No E-254

151 Qtr. No c-38 uNtT-vlil i

UNIT-VIII ]

1.00

o.50

-.so152 Qtr. No 2RA-4713

No 2RA-4611153 Qtr. UNIT.VIII

UNIT.VIII 0.40

lJ5uNtT-vlllUNIT.VIII 0.50

Qtr. No-2RA-50/1

I 0.40

i '-

o.<o

UNIT-VIII

0

UNIT.VIII

UNIT.VIII166 Qtr. No-D-4/2

168

2RB-7t7

Btock No T-3 RentaI cotony

169 Btock No FR-99 C.S.Pur

171

Bl.ock No FR-18

Btock No E-lC.5.Pur

BDA, C.5.Pur

172

173

UNIT-VIII 0.40167 UNIT.VIII 0.35

2.50

2.50170 2 @

2.50Btock No T-10 RentaI cotonYl 2.15Btock No FR-90 C.S.Pur 2.s0

174 Btock No FR-69 C.S.Pur 2.50175 Btock No FR-3 C.S.Pur 2.50176 Btock No FR-29 C.S. Pur 2.50

i'ttt BLock No F-37 Rental cotony 2.00

i 178 Btock No F-22 RentaI cotony

at cotonV I

2.00179 Btock No F-21 Rent 2.00180 Btock No F-'15 Rental colony 2.00

1181 Btock No F-13 Rental cotony I 2.50

2. -o182 Btock No F-12 RentaI cotony

E.\C.8.(B)\SPR\2018-19\AMp 2018.19\A.M.p.-2018 19-01-1a2018\A.M.p.-Res.Ctittcol-Res. Pg_7s/56

l

't 50

Name of the works

183 Btock No E-9

184 Btock No E-7

185 Btock No E-6

st.

No.Name of the

(R&B) Division(3)(2)(1)

186 tock No E-37B

la-!

187 tock No E-21

188 Bl,ock No D-9

189 Qtr. No D-41

190 Qtr. No D-9

191 Qtr. No D-2

S/R to.....

BBSR No'lV 1

I24

Dts-1514

Dts-21210 Dls-21411 Dts-11412 Dts-1412riTnT14 D/5-1511

15 R-10

R-8

tvN-10tvN-45lvN-34IVN.8

23 IVN-46

tvN-2925 F -511

26 IVN-13

27 IVN-66

28 irvN-929 E-3912 &.E-4112

30 7RA-5017

D/5-8/32

3

4Dls-814R-2

5

6 Dls-11/2Dls-1314

7

8

9

F-1311

F-512

16

3R-5/217

3R-121118

19

?021

27

E:\C.8.(B)\SPR\2018-1g\AMP 2018'1g\A.M.P.-2018-19'01-1G2O18\A M',P -Res Criticol-Res

Unit-lX (F)

Pg_16/s6

U nit AmountRequired

(4) ()) .;;

RentaI cotonY

Rentat cotonY

Rt:ntat cotony

2.00

2. 50

1.75

i Rr:ntat cotonY 1.60

Rr:ntat cotony 1

RentaL cotonY l

Jayadev Vihar 0.60

Jiryadev Vihar 0.60

Jayadev Vihar 0.60

Total= 1 30.52

MLA CotonY 1.568

MLA ColonY 0.599

MLA CotonY 0.694

MLA Cotony 0.981

MLA Coton 0.977

MLA CotonY 0.979

MLA Coton 0.984

2.00

2.00

MIA Cotony

MLA Coton

MLA CotonY 0.977

MLA Cotony 0.978

MLA CotonY 0.999

MLA CotonY 0.981

Ml-A CotonY 0.990

MLA Cotony 0.988

MLA CotonY 0.994Unit-lV 0.495

Unit-lV 0.709

Unit-lV 0.328

Unit-lV 0.500

Unit-lV 0.490

Unit-lV 0.392

Unit-lV 0.347

0.968

-o.sn

Unit-lV 0.500o.ssr

iUnit-lVUnit-lV I !r53Unit-lV 0.350

Unit-lV 0.343

Unit-lX (F) 0.494T 0347

st.

No.Name of the Works Unit Amount

Required(2) (l) t4l (s)

32

33

2RA-5/1

2RA-13/3 Unit-lX (F)34 Unit-lx (F)35

2RB-22/3

F-49t3 Unit-lx (F)

2R8.57 / 10

0.395

Unit-lx (F)

Unit-lX (F)

0.300

0.665

0.395-i^oor

36 2RB-55/4 Unit-lX (F)37 F-18/3 Unit-lX (F)38 E-63/2 Unit-lX (F)

0.399

0.799

0.300

39 2RA-28/6 Unit-lX (F) o.34940 E-3/2 Unit-lx (F) 0.39941 E-29t3 Unit-lX (F) 0.39942 E- 18/3 Unit-lX (F) 0.39543 E-15/2 Unit-lx (F) 0.39544 B-4t8 Unit-lX (F) 0.98445 4RF-11 Unit-lX (F) 0.98446 4RF-8 Unit-lX (F) 0.9u47 2RB-54t11 Unit-lx (F) 0.3964 2RB-44/2 Unit-lX (F) 0.35549 2RB-44t4 Unit-lx (F) 0.39550 2RB-51/7 Unit-lx (F) 0.39651 zRB-20/8 Unit-lX (F) 0.39552 2RB-21t1 Unit-lx (F) 0.39553 2RB-21/7 Unit-lX (F) 0.39654 E-31t2 Unit-lx (F) 0.39555 2RA-31/4 Unit-lx (F) 0.34656 E-58/3 Unit-lx (F) 0.39557 E-58t4 Unit-lX (F) 0.39558 2RA-36/5 Unit-lX (F) 0.34659 2PA-31/7 Unit-lx (F) 0.34660 2RA-31/6 Unit-lx (F) 0.34661 2RA-36/7 Unit-lX (F) 0.34662 2RA-31/5 Unit-lX (F) 0.34663 2RA-26t2 Unit-lx (F) 0.34664 2RA-23/8 Unit-lX (F) 0.30065 zRA-10/3 Unit-lX (F) 0.34666 2RA-17 /6 Unit-lX (F) 0.34667 zRA-16/5 Unit-lX (F) 0.34668 3RF-3/3 Unit-lX (F) 0.59169 zRA-3t2 Unit-lX (F) 0.34670 2R -24/4 Unit-lX (F)71 2RA-26/5 Unit-lx (F)72 zRA-34/4 Unit-lX (F)

0.346

0.3460.345

73 2RA-32/8 Unit-lX (F) 0.346

\)"Name of the(R&B) Division

(1)

E:\c.8.(B)\SPR\2o18- 19lA MP 20 1 8- 19\A. M _ p _- 20 1 8- 1g-O 1_ 1 c2O18V. M. p. _Res.cr iticol_Res. Ps_17 /5b

31

Name of the(R&B) Division

st.No.

Name of the Works

(1) (2)

74

75

76

77

78

79

(3) (4) (5)

F 1 2 1 tJnit-lX (F) 0.346

F-18/2 tJnit-lX (F) 0.346

zRA-24/6 Unit-lX (F) 0.346

7RA4/3 Unit-lX (F) 0.346

2RA-9/3 lJnit-lX (F) 0.346

7RA-17 t3 tJnit-lX (F) 0.346

2RA-25/8 Jnit-lX (F) 0.346

E-61 l2 Unit-lX (F) 0.391

E-55t2 Unit-lX (F) 0.395

2RA-35/6 Unit-lX (F) 0.346

2RA-47 / 11 Unit-lX (F) 0.346

2RA-35/5 Unit-lX (F) 0.346

zRA-216 Unit-lX (F) 0.342

2RA-8/3 Unit-lX (F) 0.346

2RA-24t7 Unit-lx (F) 0.346

F -1617 Unit-lX (F) 0.346

2RA-43t1 Unit-lX (F) 0.303

80

81

82

83

84

85

86

87

88

89

90

91 F-5/7 Unit-lX (F) 0.346

92 F-5t4 Unit-lX (F)

2RA-117 Unit-lX (F)

2R -5/7 Unit-lX (F)

zRA-15t2 Unit-lX (F)

0.346

93 0.346

94 0.445

95 0.346

96 2RA-15t4

F-6t 1

zRA-3?t6

Unit-lX (F)

Unit-lx (F)

Unit-lX (F)

Unit-lx (F)

0.347

97 0.346

98 0.345

99 E-2713 0.389

100 Btock D-9 Unit-lX (F)

Unit-lx (F)

Unit-lX (F)

Unit-lX (F)

2.941

101 2RB-56t4 0.395

102 2RB-F-55/ 10 0.395

103 2RB-54/7 0.395

104 2RB-19/8 Unit-lX (F) 0.395

105 3RF-4 Unit-lx (F)

Unit-lx (F)

Unit-lX (F)

Unit-lX (F)

2.941

106 F-7t6 0.346

107 F-4t2 0.346

108 zRA-29/1 0.346

109 2RA-36/1

110 2RA-23/5

0.346

0.346111 2RA 23/6 0.346

0.395

4.194

112 2RB-56/7

113 D-14/2114 4RF-25 0.984

0.300115 2R -30/2

116 2RB-19/8 0.39 s

U nit AmountRequired,:

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lx (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

E:\C-E.(B)\SPR\2O18-19\AMP 2018-19\A M.P.-20la-19-01-1O-2O18\A.M.P.-Res.Citicol-Res.

Unit-lX (F)

Pg_L9/ 56

st.No.

UnitName of the Works

(4)(1)

Name of ther^R&B) Division

(2) (3) (s)

160

1 6 1

162

163 Unit-lX (F)

164 E-49t4 Unit-lX (F)

Unit-lx (F)165 3RF-6t2Unit-lX (F)

8-6 t12 0.984

2.941

Unit-lx (F) 0.591

0.300

0.591

Unit-lX (F)

Unit-lX (F)3RF-7

3RF-6/1

3RF-13 /3

0.591

0.300166 2RB-s3 /7Unit-lX (F) 0.346167 E-$t1Unit-lX (F) 0.3M168 2RA-4311

Unit-lX (F) 0.346169 F-517

Unit-lx (F) 0.346170 zRA-3t7Unit-lx (F)F-5t41 17

Unit-lx (F)

0.346

0.395172 2RB-21t4Unit-lX (F) 0.349173 F-18t4

Unit-lX 0.597174 zRA-16 Rd-5

Unit-lx (F) 0.400175 2RA-37t8Unit-lX (F) 0.994176 B-7 t14Unit-lx (F) 0.596177 D-4t3Unit-lX (F) 0.5973RF-12/1178Unit-lX (F) 0.597179 3RF-4/3

Unit-lX (F) 1.9744RF Btock No-5180

Unit-lX (F) 0.5961 8 1 3RF-7 t10.349Unit-lX (F)2RA-43t4182

Unit-lX (F) 0.597183 3RF-7/30.596Unit-lX (F)1U 3RF-8/40.596Unit-lX (F)185 3RF-17 t10.597Unit-lX (F)186 3RF-9/10.349Unit-lX (F)187 2RA-11t20.s97Unit-lX (F)'188 3RF-14t20.596Unit-lX (F)189 3RF-6/40.399Unit-lX (F)zRB-51 /61900.349Unit-lX (F)2RA-2/811 90.349Unit-lX (F)192 F-13140.399Unit-lX (F)E-28t21930.349Unit-lX (F)194 2RA-9/50.349Unit-lx (F)195 2RA-17180.349Unit-lx (F)196 2RA-7 t30.399Unit-lX (F)197 2RB-5114

Unit-lX (F)198 3RF-9t4D-1 /1199

Unit-lx (F)200 2RA-1714

Unit-lx (F)

0.596

0.596

0.5970.349

Unit-lX (F)3RF-1 1 / 3201 0.349Unit-tx (F)2RA-42/s202

AmountRequired

E : \c. E. I B)\s P R\2 o 1 8' 7s\AM P 20 1 8' 19\A M P.-2o 1 8-1+o 1-1G2o18V M P "Res'Ctit,cdl'Res

Pelol 56

i)

Name of the(R&B) Division

Amouet

RequiledUnitGme of the Worksst.

No.(5)(4)(3)(2)(1)

D-'19117'1 18

119

2RA-25i 8120

lRF-61161210.346

3RF-04

F-7 l3

2.940

0.346

7.941Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F) 0.346

0.346

E-1111220.346

7R -6171230.146

Unit-lX (F)

Unit-lX (F)124 2RA-35/5

0.591125 3RF-3/3

0.590Unit-lX (F)

Unit-lX (F)3RF -1411126

0.344E-2317127

0.389E-6311178

0.346F-1617129

0.396

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)zRB-2112130

0.3952RB-50/511 3

0.59 1

D-12141370.396

2RB-49111330.346

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)zRF-612134

0.342Unit-lX (F)2RA-Z|6135

0.3462RA-66 Rd-4136

0.395E-2411

Unit-lX (F)

Unit-lX (F)137

0.590Unit-lX (F)D-214138

0.591Unit-lX (F)3RF-1412139

0.346Unit-lX (F)140

0.396Unit-lX (F)F-714

zRB-52121410.396Unit-lX (F)

2RB-57/51420.591Unit-lx (F)

3RF-9/21430.346Unit-lX (F)

zRA-29111440.346Unit-lX (F)

145 F-18140.346Unit-lx (F)2R -17 111460.346Unit-lX (F)

E-56131470.346Unit-lX (F)

F-9131480.346Unit-lX (F)il RA -88 Rd-51490.346Unit-lX (F)

150 F-18t20.346Unit-lX (F)

1 5 1 F-24/ 6Unit-lx (F)152 2RA-40/5 0.346

153 Unit-lX (F) 0.346154 Unit- lX 0.346155

2RA-24/2

E-39/32RB-2/2 Rd-7

Unit-lX (F) 0.346156 E-60/2 Unit-lX (F) 0.346157 Unit-lX (F) 0.346158

Unit-lX 0.346159

2RA-48/11

2RA-26/6

E-48/2 Rd-6

Unit-lX (F) 0.345t .,..i_(8)\spR\2018-19\AMp 2O1a D\A.M.p. - 2 O18 19 -O 1 - 1 O- 2 O 1 B\A. M. p_ - Re s. C titi co I_ Re s Pg_L9/ F6

t-Name of the.4.R&B) Division

st.No.

Name of the Works Unit AmountRequired

(1) (2) (3) (4) (s)

203 D-5/4

E-29/4

F-12/2

Unit-lX (F) 0.596

0.401

0.350

0.399

0.300

0.400

204 Unit-lX (F)

205 Unit-lX (F)

206 E-20/4 Unit-lX (F)

207 E-5/3

2RB-56/ 5

Unit-lX (F)

208 Unit-lX (F)

709 2RA-5/4 Unit-lX (F) 0.349

210 2RB-49/7 Unit-lX (F) 0.399

0.349211 2RA-28t4 Unit-lX (F)

212 2RA-35/1 Unit-lX (F) 0.349

213 2RA-32t5 Unit-lX (F) 0.348

214 2RA-35/3 Unit-lX (F) 0.349

215 2R -33t2 Unit-lX (F) 0.349

216 zRA-33/1 Unit-lx (F) 0.348

217 2RA-34t2 Unit-lX (F) 0.349

218 2RB-39/6 Unit-lX (F) 0.399

219 2RA-3/5 Unit-lx (F) 0.349

220 F-9 /1 Unit-lX (F) 0.349

221 4RF-31 Unit-lX (F) 0.994

zzz D Type Btock No-10 Unit-lX (F) 2.970

223 2RB-52/5 Unit-lX (F) 0.399

224 3RF-1 /4 Unit-lX (F) 0.597

225 2RB-1912 Unit-lX (F) 0.400

226 zRB-57 t9 Unit-lX (F) 0.399

227 F-11- 411 Unit-lX (F) 0.3s0

228 2RB-4511 Unit-lX (F) 0.399

229 3RF-16/2 Unit-lx (F) 0.596

230 3RF-8/3 Unit-lX (F) 0.596

231 2RB-56/9 Unit-lx (F) 0.399

232 B-2t3 Unit-lX (F) 0.993

233 2RA-30t7 Unit-lX (F) 0.350

234 sRF-2t4 Unit-lX (F) 0.994

235 2R -8t2 Unit-lX (F) 0.349

236 E-58t1 Unit-lX (F) 0.400

237 2RB-2014 Unit-lX (F) 0.400

238 2RB-58t12 Unit-lX (F) 0.399

239 2RB-49t5 Unit-lX (F) 0.400

0.399240 2RB-49/6 Unit-lX (F)

241 2RA-33/8 Unit-lX (F) 0.349

242 E-2012 Unit-lX (F) 0.399

743 D-1514 Unit-lX (F) 0.597

244 2RB-4617 Unit-lX (F) 0.400

o.349245 2RA-11t1 Unit-lX (F)

E:\c.E.(B)\SPR\2O18-19\AMP 2018'19\A.M-P-'2018'19'O1'1G2018\A.M-P.'Res CriticolRes' Ps_27/ F6

ti\

st.

No

Name of the(R&B) Division

Name of the Works

(1) (7) (3) (s)

251

252

253

254

255

2RA-13-R-3

2RB-2/4-Rd-6

256 2RA-86-R-5

0.3460.350

257 2RB-11-R-6

258 2RB-8-R-7

0.452

0.300

259 zRA-32/11-R-6 0.353

260 0.400

261 0.400

262 2RA-5 BSC 0.350

263 2RA-91--Rd-6 0.347

264 2RA-35--Rd-4 0.348

265 2RA-11--Rd-4 0.343

266 2RA-12--Rd-4 0.346

267 1R-68--Rd-2

268 2RB-89-Rd-1

0.264

0.396

269 2RB-2-Rd-6 0.396

270 1R-20-Rd-2 0.289

271 2RB-96-Rd-2 0.396

27z 1R-44-Rd-7 0.292273 0.295

274 2RB-35-Rd-5 0.392

275

276

2RA-64-Rd-8

2RA-29-Rd-4

0.346

0.350

277 0.259278

2RA-30/ 1 _LiILlx (Fl

Ltnit-lX (F)

0.349

I o.:ss2RB-58/ 5

2RA-38-Rd-5 Unit-lX (RZ) 0.346249 2RA-85 -Rd-5 Unit-lX (RZ) 0.347

750 2RA-68 -Rd-8 Unit-lX (RZ) o.349

i.tsz2RB-97 -Rd-5 Unit-lX (Rz)

2RA-85 -Rd-4 Unit-lX (RZ) 0.450

2RB-28-R-6 Llnit-lX (RZ) 0.951

Llnit-lX (RZ) 0.352

tJnit-lX (Rz)

L.lnit-lX (RZ)

lJnit-lX (RZ)

Unit-lX (RZ)

lJnit-lX (RZ)

2RB-8-R-7 Jnit-lX (Rz)

2RB-114-R-2 Unit-lX (RZ)

Unit-lx (Rz)

Unit-lX (RZ)

Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lx (Rz)

Unit-lX (Rz)

Unit-lX (Rz)

Unit-lX (Rz)

1R-46-Rd-3 Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

1R-24-Rd-8 Unit-lX (RZ)

1R-68-Rd-6 Unit-lX (RZ) 0.284279 0.283

280 Unit-lX (RZ) 0.396281 Unit-lX (Rz) 0.396282 Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

0.393

0.2960.297

Unit-lX (RZ)1R-31-Rd-7

't R-12-Rd-3

2RB-45/5-Rd-5

2RB-1/1-Rd-5

zRB-1/7--Rd-5

1R-57-Rd-1

1R-29--Rd-1

1R-71 --Rd-5

287

283

286

284

285

288

Unit

(4)

AmountRequired;

2RA-84 -Rd-4

R-49-Rd-5

Unit-lX (Rz) 0.297

0.280

Unit-lX (RZ) 0.350

0.300E:\c.E.(8)\SPR\2o18-19\AMp 2018 19\A.M.p.-2018 19-01-10-2ojBV.M.p.-Res.criticot Res. Ps_22/ 56

l1i'Amount

Requiredst.No. 4)((2) 0.100Unit-lX (RZ)

1R-sa -Ro-:2890.594Unit'\X (RZ)

290 3R-95 -Rd-6

Unit-lX (RZ) 0.5943R-166 -Rd-1791Unit-lX (Rz) 0.594292 3R-165 -Rd-2

Unit-lX (RZ) 0.300293 'tR-66 -Rd-6

Unit-lX (Rz) 0.349294 2R-86 -Rd-6

Unit-lx (Rz) 0.300795 1R-16 -Rd-z

Unit-lX (RZ) 0.300296 1R-75 -Rd-1

Unit-lX (RZ)297 2RA-53 -Rd-4 0.350

298 Unit-lx (RZ)2RB-32 -Rd-4 0.3 52

299 2RB-110 -Rd-2 Unit-lX (RZ) 0.400

300 3R-156 -Rd-2 Unit-lX (RZ) 0.593

301 2RB-1/7 -Rd-6 Unit-lX (RZ) 0.400

302 2RB-8 -Rd-6 Unit-lX (RZ) 0.4()0303 2RB-4 -Rd-6 Unit-lX (RZ) 0.400304 2RB-94 -Rd-2 Unit-lx (RZ) 0.39930s 2RA-26 to 32 -Rd-3 Unit-lX (Rz) 1.485306 2RA-114 to 120 -Rd-3 Unit-lX (Rz) 0.990307 2RB-38 -Rd-6 Unit-lX (Rz) 0.400308 2RB-132 -Rd-z Unit-lX (Rz) 0.400309 2RB-2/8 -Rd-7 Unit-lX (RZ) 0.400310 2RB-'t6 -Rd-7 Unit-lX (Rz) 0.400311 1R-56 -Rd-5 Unit-lX (Rz) 0.499312 1R-3 -Rd-2 Unit-lX (Rz) 0.300313 1R-32 -Rd-2 Unit-lX (RZ) 0.300314 2RB-119 -Rd-l Unit-lX (RZ) 0.400315 1R-53 -Rd-6 Unit-lX (RZ) 0.300316 1R-21 -Rd-1 Unit-lx (RZ) 0.299317 1R-4 -Rd-2 Unit-lx (Rz) 0.300318 tYR-4/1 CHC Unit-lx (Rz) 0.593319 2RA-82 -Rd-7 Unit-lX (Rz) 0.350320 1R-22 -Rd-3 Unit-lX (RZ) 0.300321 1R-63 -Rd-1 Unit-lX (Rz) 0.322322 1R-9 -Rd-7 Unit-lX (Rz) 0.289323 1R-10 -Rd-3 Unit-lX (Rz) 0.277324 vR-2/1 CHC Unit-lX (Rz) 0.593325 2RA-124, Rd-7 Unit-lX (Rz)326 2RA-106, Rd-6 Unit-lX (RZ)

0.4000.400

327 2RA-59 -Rd-4 Unit-lX (RZ) 0.399328 2RA-96 -Rd-4 Unit-lX (Rz) 1.115329 zRB-136 -Rd-2 Unit-lX (RZ) 0.400330 2RB-1 -Rd-5 Unit-lX (Rz) 0.400331 1R-15 -Rd-1 Unit-lX (Rz) 0.289

T Name of the

:'\R&B) Divislon(1)

E:\c.E.(8)\sPR\2o1 8 1 9 \A M P 2 0 1 8- 1g\A_ M. p. -2O 1 & 1g-O 1- 10_20 1alA. M. p. _ Res _Ctitica t - Res eg_23/ i6

(5)

WorksName of the

2RA-40-R-4

1R-56 -Rd-2

2RB-'t 12 -Rd-2

2RA-26 -Rd-3

tR-21 -Rd-2

Name of the(R&B) Division

st

No.

Name of the Works

(1) (2) (3)

332

333

334

335

1R-80 -Rd-6336

337

338

339

1R-73 -Rd-1

zRB-122 -Rd-2

340 2RA-15 -Rd-3

341 2RB-14-R-7

147

343 2RA-85 to 2RA-91-R-7

rR-42-R-7

3R-15s-R-4344

345 2RA-8/1 to 2RA-8/4-R-7

346 rR-26-R-8

347 2RB-120-R-2

rR-25-R-2348

tR-23-R-1349

tR-27-R-1350

351 tR-11-R-1

3R-13s-R-5352

7RB-46/4-R-6353

354 3R-2 BSC

2RA-10-R-5355

rR-34-R-7356

2RB-1/3-R-6157

358 tR-39-R-6

359 2RA-81-R-7

tR-13-R-7360

361 tR-21-R-7

2RB-131-R-'1362

363 2RB-135-R-1

tR-16-R-3364

lR-25-R-736s

366 tR-5-R-7

2RB-6-R-6367

tR-57-R-2368

2RB-91-R-',I369

lR-33-R-2370

371 2RB-10-R-6

tR-61-R-5372

2RA-86-R-4373

374 2RB:99-R- 1

E:\C E-(8)\SPR\2O18-1,\AMP 2018 1g\A.M.P.2018-19 01-10 2018\A M P','Res',Criticol'Res

Unit-lX (RZ)

PE_24/ 56

Unit AmountRequiredl'

(4)

Unlt-lX (RZ) 0.350Unit-lX (RZ)

Unit-lX (RZ)

0.2990.400

Unit-lX (RZ) 0.35'1

Unit-lX (RZ) 0.300

Unit-lX (RZ) 0.300

Unit-lX (Rz) 0.300

Unit-lX (RZ) 0.400

Unit-lx (RZ) 0.348

Unit-lX (RZ)

Unit-lx (Rz)

Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (Rz)

Unit-lx (Rz)

Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (Rz)

Unit-lX (Rz)

Unit-lX (RZ) 0.600

Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unrt-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (Rz)

Unit-lX (RZ)

Unit-lX (Rz)

Unit-lx (Rz)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

urrit-lx (Rz)

Urrit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (Rz) 0.350

(5)

0.400

0.300

1.000

0.600

1.000

0.300

0.400

0.300

0.300

0.300

0.300

0.415

0.600

0.3s4

0.317

0.400

0.309

0.352

0.300

0.300

0.400

0.400

0.300

0.300

0.300

0.413

0.300

0.400

0.371

0.400

0.400

0.303

,it".AmountRequired

Unitst.No.

Name of the WorksName of the'(R&B) Division

(4) (5)(2) (3)(1)

Unit-lX (Rz)

Unit-lX (RZ)378

375 2RB-5-R-5

376 2RB-40-R-6

2RB-7-R-6

tR-59-R-5 0.306

0.400

0.400

o.423

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ)379 3R-93-R-6

Unit-lX (Rz)2RA-63-R-4

Unit-lX (Rz)381 tR-31-R-1 0.300

0.600

0.3 50

377

380

Unit-lX (RZ) 0.350382 2RA-1 1 3-R-2

Unit-lX (RZ) 0.400383 2RA-9/3 R-6

Sainik School 0.300384 Vice PrincipaI Residence

Sainik School 0.495385 3R-8

Sainik Schoot386 1R-5 0.300

Sainik School 0.399387 2R8.8

Sainik SchootzRB-14 0.400388

New GA

Cotony0.394389 F-3 Qtr No. 7/2

New GA

Cotony0.495390 D-4 Qtr No. 6/2

New GA

Cotony0.398391 E 1 2 1 1

New GA

Cotony0.395392 o-2-4t2

New GA

Cotony0.501393 c-4-1t1

New GA

Colony394 E-3-10/3 0.398

New GA

Cotony0.501395 o-4-5tz

New GA

Cotony0.594396 c-1-8/3

New GA

Cotony0.498397 E-9-1 l1 to 211

New GA

Cotony398 E-10-13t4 0.448

New GA

Colony0.398399 E-15-4t1

400 E 1 0 11/3 New GA

Cotony

New GA

Cotony

0.399

0.398401 E-8-7.t'l

0.500New GA

CotonyI qoz D-5-4/2

t:rC.E.lB)\SPR\2O18-19\AMP 2O1a-19\A.M.P.2018-1941-1G2018V.M.P.-Re..CtiticolRes. Pe_Lsl 56

Amoun

Required_st.

No.

Name of the Works Unit

(3) (4) (s)

Name of the(R&B) Division

(2)(1)

405

406

407

408

0.588

0.346

D-5 Qtr No. 13/4 0.493

E-12 Qtr No. 9/3 0.39s

E-10 Qtr No. 15/4 0.394

0.398

403 C-2 Qtr No. 3/2

404 F- 10 Qtr No. 7 l2

New GA

Cotony

New GA

Cotony

New GA

Cotony

New GA

Cotony

New GA

Cotony

0.399409

410

E-3 Qtr No. 14l4

E-9 Qtr No. 2/'l

E-16 Qtr No. 4/'t 0.387

411 0.393

412 0.496

413

414

0.493

0.498

415 0.493

E-9 Qtr No. 4/'l

D-5 Qtr No. 11l3

D-3 Qtr No. 12l4

D-1 Qtr No. 6/2

New GA

Colony

New GA

Cotony

New GA

Cotony

New GA

Cotony

New GA

CoIony

New GA

Cotony

New GA

Cotony

New GA

Colony

New GA

Cotony

416

D-5 Qtr No. 12l4

D-1 Qtr No. 11l3 0.495

417 D-4 Qtr No. '10l3

418 E-3 Qtr No. 1/1

New GA

Cotony

New GA

Cotony

0.493

0.395

419

420

421

D-6 Qtr No. 6/21

D-6 Qtr No. 11l3

D-6 Qtr No. 3/1

422

423

F-4 Qtr No. 3/1

F-8 Qtr No. 13l4

0.497

0.497

0.497

0.350

0.350

New GA

Cotony

New GA

Colony

New GA

CoIony

New GA

Cotony

New GA

Colony

f :\c. E.(B)\SPR\2o18-1g\AMP 2018-19\A.M.P.-2o18-19-01-10-2018\A. M P -Res Ctiticol-Res Pc_261 54

t'Name of the, ^1R&B) Division

(1)

st.No.

Name of the Works Unit AmountRequired

(2) (3) (4) (5)424

425

426

427

428

D-1 Qtr No. 412

D-3 Qtr No. 3/1

New GA

Cotony0.496

New GA

CoIony0.496

New GA

CoIony0.588

New GA

CoIony0.472

C-1 Qtr No. 6/2

D-3 Qtr No. 1/1

F-4 Qtr No. 6i2 New GA

Cotony0.350

429 E-7 -14t 4 New GA

Colony0.399

430 E-7-16t4 New GA

Cotony0.399

431 D-6-15/4 New GA

Cotony0.498

432 D-4-7 t2 New GA

Cotony0.497

433 F-4-14t4 New GA

Cotony0.349

434 E-10-12/3 New GA

Cotony0.399

435 F-11-14t 4 New GA

Cotony0.349

436 D-3-13t4 New GA

Cotony0.499

437 F-3-6/2 New GA

Cotony0.349

438 D-6-10t3 New GA

Cotony0.499

439 E-'t4-7 /2 New GA

Colony0.398

440 D-6-14/4 New GA

Colony0.497

441 F-13-13t4 New GA

Cotony0.349

442 F-10-11/3 New GA

Colony0.348

443 D-2-8/3 New GA

Cotony0.496

444 D-2-14/4 New GA

Cotony0.555

E:\C E.(B)\SPR\2o18-19VMp 201B-ls\a.M p.-2o1a-1s-01-1c2o1BV.M.p._Res.Ctiticot-Re' Pe_27 / V6

New GA

Cotony

I'lew GA Cotony

New GA Cotony

Nlew GA Cotony

t ew GA Cotony

l.ew GA Cotony

New GA Cotony

V55 Nagar

cHc

Amou n

Required--SI

No.

UnitName of the(R&B) Division

Name of the Works

(4) (5)(2) (3)(1)

449

450 F-10-5/2

0.396451 E-14-4/ 1

0.398452 E-4-411

0.349453 F-2-6t2

0.349454

445 F-6-3/1 New GA

Cotony0.349

446 F-8-12/3 New GA

Cotony0.349

447 F-4-12/3 New GA

Cotony0.349

448 F-6-14/4 New GA

Cotony0.347

F -3"311 New GA

Cotony0.349

New GA

Cotony0.349

New GA

Cotony

New GA

Colony

New GA

Colony

F-1-11 / 3 New GA

Cotony

c-3-9t3 New GA

Cotony0.500455

0.350456

0.486457

0.350458

0.3 50459

E-1-7 t2

D-2-1314

E-7-1314

New GA

Colony

New GA

Colony

New GA

Cotony

New GA

Cotony

New GA

Cotony

0.349460 F-10-1314

E-7-3/1

0.498461

0.4004620.3s0463

c-3-1 l1

E-5-311

E-11-7/ 1

0.3 50464

465

466

467

E-16-10/3

F-9-411

E-2-3t1

E-16 Btock 1.098

0.400

0.349

468

469

0.399

0.405

0.600

470

2R-6

vR-1/2 CHC

rvR-3/3 CHC

E.\c.f.(8)\SPR\2O18-19\AMP 201a-19\A-M.P. 2018-1941 1G2078\A M.P.-Res.Criticol-Res.

CHC

Pc_28/ T6

Name of the(R&B) Division

st.No.

Name of the Works Unit AmountRequired

(1) (2) (3) (4) (s)

471

477

2R-1 /7CHCVR-3/1 CHC

2RA-1 BSC to 2RA-4 BSC

cHc 0.350cHc 0.593

BSC 0.496B5C 0.350BSC 0.593

473

474 2RA-3 BSC

475 3R-1 BSC

476 3R-148-R-2 Unit-lX (RZ) 0.714

0.300477 2R -47, Rd-4 Unit-lX (Rz)

478 2RB-17-R-6 Unit-lX (RZ) 0.595479 S/R to E-Type Quarters at Unit-lx (F), BBSR

(such as supplying of Sal wood choukaths &piasal wood panel shutter)

Unit-lX (F) 4.494

480 5/R to F-Type Quarters at Unit-lx (F), BBSR

(such as supptying of 5a[ wood choukaths &piasal wood panel shutter)

Unit-lX (F) 1.340

481 S/R to F-Type Quarters at Unit-lx (F), BBSR

(such as supptying of Sa[ wood choukaths &piasal wood panel shutter)

Unit-lX (F) 5.110

Totat = 242.03BBSR No.-V 1 E-02 Baramunda

area0.30

2 E-08 Baramundaarea

0.30

3 E-12 Baramundaarea

0.30

4 E-14 Baramundaarea

0.30

5 E-18 Baramundaarea

0.30

6 E-20 Baramundaarea

0.30

7 E-36 Baramundaarea

0.30

8 E-40 Baramundaarea

0.30

9 E-43 Baramundaarea

0.30

10 E-44 Baramundaarea

0.30

1',! E-46 Baramundaarea

0.30

't2 E-47 Baramundaarea

0.30

E:\C.E.(B)\sPR\2o18-19\AMP 2018.19ly'.M.P.-2O18-1941-102018\A.M.p.-Res.critjcot-Res. Pc_zs/ 56

st.

No

Name of the WorksName of the(R&B) Division

(2t (3)(1)

16

17

18

19

20

0.3021

F-54

F-68

F-70

0.3022

23 0.30

0.3024

0.3025

0.2576

(4)

13 E-48 Baramundaarea

0.30

14 E-51 Baramundaarea

0.30

15 F-7 Baramundaarea

0.30

F-5 Baramundaarea

0.30

F-40 Baramundaarea

0.30

F-44 Baramundaarea

0.30

Baramundaarea

0.30

Baramundaarea

0.30

Baramundaarea

F-78 Baramundaarea

F-79 Baramundaarea

F-82 Baramundaarea

F-98 Baramundaarea

F-101 Baramundaarea

Baramundaarea

0.3027 F.1M

Residentiat quarters of B.K Cottege Art & Crafts.

0.4028

29

30

D-1

D-2

(singte storied)

F-1

Un it Amoun

Required

(s)

Khandagiriarea

Khandagiri 0.40area

Khandagiri 0.25

E:\C.:.(B)\SPR\2018 19\AMP 2018-19\A.M P.2018-19 07 1O-2O1A\A.M.P.-Res.Criticol Res.

area

Ps_3o/ 56

I

Name of the(R&B) Division

(1)

st.No.

Name of the Work Unit AmountRequired

(2) (3) (4) (s)

32

F-2 Khandagiri 0.30area

Khandagiri 0.30area

3 1

F-3

Khandagiriarea

0.30

Totat = 10.00

33

Cuttack-l 1

2

3

Qr. No.V/2 &Qr), Cuttackback side cedistempering)

(MS door fixing, brick work,ment concrete, painting &

F-4

S/R to.....lVl5 in BOSE Campus (DTET 1.05

1.77

2.204 15nos of Stafftine, SCBMCH, C

in 4Btocks in Sweeper

DPW Sta ,ff oN 2Qr RB A 2 In '|K tIa of, rt c ctIt &le oc ulo( nn )g

oN 2 nIar BOSE Cam US Uc tt ca kp

Qrstc

0.90

5 ar. No.C/25 atCuttack

Kanika Chhak,r50-t,0.92

6 Sweeper tine stafSCBMCH, Cuttack

k-E Qr. No.1 to 5,f Qr Btoc1.54

7SmrutiJ P No 1 2Qr Uocc ied Drp by

s a nI ss tA roP f ENT s BMc Hc ctc1.03

8 J.P. Qr. Ho.tZSarangi, SCBMC

occupied by Dr. CharutataH, CtC

1.33

9 Temp. shed O iBudhia Patra)

afort (occupied bynside Kitl1.33

10 Qr. No.E/3 to E/13Colony, Gorakabar

F) at Otd Revenue(G0.65

11 G type Qr. No.GSCBMCH, CtC

-114 near Canat side, 0.95

12 oN c 1ar tB k 1oc I cn( B) oc6 Uc Iedp byrD Sandh nra I B heya r.e a

2.76

13 Temp. Shed iA.K.Swain

n Killafort occupied by 3.62

14 Temp. Shed in KitKu Biswal

ort occupied by SaratIaf0.54

'15

17 r N o Ca 3 ns de os 1 Ka n ka c hh ka

0.45

0.95

1.33

Temp. Shed in KittCh. Patra

afort occupied by Rama

Qr. no.G-1 /4Cuttack

near Cana[ side, SCBMCH,

E:\c.E.(B)\spR\201.8 1g\AMp 2o1a_ts\A.M.p.-2o18-ts-o1_10-2018V.M.p.-Res.ctiticot-Res.Pe_31/ 56

16

1

SI

No.

Name of the WorksName of the(R&B) Division

(s)(7) (3)(1)

20

Qr. No.2RB/6, Vigilance Cotony, Tutasipur21

22

23

0.67

0.20

0.8024

0.5225 Behera Line staff O No.B/'l 'l , F/11 , El12,SCBMCH, CtC

0.9826

0.5527

0.7428

0.4929

o.7530 Behera tine Staff O, B Block SCBMCH,

Cuttack (Tarfetting)

31 0.55

1.64Qr. No.6, SCBMCH, Cuttack (Ftoor tite, Watt

tite, MS gritt & distempering)32

1 .50Driver Qg. No.4, SCBMCH, Cuttack (Brickmasonry, A.C. sheet roofing & AS ftooring)

33

1.84

1.62ar No.Vl/10, Ambatota Colony, BOSE

Camus, Ctc

34

35

Unit

(4)

AmountRequired

0.42

4.72

0.45

0.81

I Qr. No.NRS-5 occupied by Debasis Mohanty,ElC, WR & Qt . llu,l'{RS-3, Kutrruditri Dei nearYMCA, CtC

ar. No.S.O.-12, Cantonment road, Ctc(occupied by G.R. Purohit, Member,

Judiciat SAT)

ar. No.C.B.-19 occupied by Chairman,OPSC, Cantonment (Tarfett)

Qr. No.2RB/11, Vigitance Colony, Deulasahi

Qr. No.2RA/3 inside Vigitance Directorate,Ctc

Behera Line staff Q,r, F Btock, SCBMCH, Ctc

Behera Line staff Qr G Btock No.7,

scBMcH, ctcUnmarried Nurses Qr No.20, SCBMCH,

Cuttack

Sweeper Line Qr. A Btock, SCBMCH, Ctc

Married Nurses Qr. No.3, SCBMCH, Cuttack(Occupied by Jayantirani Padhi)

Temp Shed Qr. of Works Deptt (occupiedby K.K. Moharana & Ranjit Das, A.E. Civit)

19

E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P--2O18 19-O1.10-2018\A.M-P.'Res.Criticol'Res PE_32/16

1

D type Qr. 2nos near Taladanda Canal side,SCBMCH (Ptastering, ftoor tite, watt tite,distempering, weather coat painting)

Name of the/i?&B) Division

(.1

No

36 LIC Qr. Block D.

(FLoor tite, wa[[paln ung)

Qr. No.2RB-B/22,Gorakabar, Ctc

Name cf the Vy'orks

No.2 2.

tile,Jobra. Cuttack

distempering,

^:i Amou ntRequired

(v(1)

0.11

Old Revenue CoLony,

38 Qr. No. E-4l'19, Otd Revenue Colony,Gorakabar, Ctc (2nd ftoor)

39 Qr. No.E/'1 & E/9, New Ambatota Cotony,BOSE Campus, Ctc (Brick work, ptastering,ftooring)

1.13

0.37

0.66

40 Qf. No.E/3, New Ambatota Cotony,Campus, Ctc (Ftoor ti[e, Brickdistempering & painting)

BOSE

work,o.41

41 Temp Shed Qr & Etectrical SDO QrSCBMCH, Cuttack (Tarfetting)

IN o.73

1 .3842 -femp. Shed Qr inside Kittafort (occupied By

Gobinda Pradhan )

43 Temp. Shed Qr inside Kitlafcrt (occucied By

Rama Ch. Shi)0.74

(2t (3) (4t (s)

44 Temp.shed Qrs in Kitafort Ctc.occ.by Sri

Go[akha Singh, PeonC,S.ll)0.86

45 Qr No.J.O.16 at,Cuttack(OfficeCommissionei' J.TempLe

of 1.17

46 Qr No. CB-2 (Out side wether seal coatetc, 0.66

47 E'typeQrs.(DTET)in New Ambotota CotonyBOSE(5uch as ptinth protechtion, weatherseaI coat distempoering,gritt fixing)

1.32

48 Q.r.No.C.B-6(Btock-1)(Repairing of Garage &front road concreting)

7.49

49 Qr. No.S.O-19(lnternat drain, ptinthprotection,GCl sheet roofing,etc,

4.94

3.0050 C.Tax Cotony, Tutasipur (Btock-B)

51 D type Qr. of Treasury at KVK Road, Ctc(Repair of O. No.D/1 to D/3)

2.00

52 Fireman Qr. (OFS-6/1R to 10/1R), Cuttack53 Fireman Qr. (OFS-21/1R to 25l1R), Cuttack

4.00

5.00

54 F;.--'::" Or-. {OFS-27/1R tc 32i 1R}. Cuttack 5.00

55 30nos C type Qr. at ISO-1, Kanika Chhak,Ctc (Repair to Block-1 Qr. No.C/1 to C/6)

3 .00

E.\c t (6)\sp8\2016.19\aMp 201a E\A M p..2c1g t9 24 at 2au-cD\a M p Res cnticat Re5 P-q_33/56

)iO

Nar:e ci i.=(R&B)Division

SI '.'::re ci::: ',\/c r-ks iJ:r it j, *:1- - -

Recu:reC

(1)

No

(-r )

56 3Onos C type Qr. at ISO-1, Kanika Chhak.

Ctc loutside painting to B[ock-4 Qr.

No.e /19 to C1241

57 30nos C type Qr. at ISO-1, Kanika Chhak,

Ctc (Repair to BLock-5 Qr. No.C/25, C/29 &c/ 30)

58 t type Qr. of OPiC stafiat Sector-6, CDA,

Cuttack (Outside painting to Snos Qrs ofBtock-A)

59 E type Qr. of OPSC staff at Sector-6, CDA,

Cuttack (Repairing to 12nos Qrs of Btock-F,

No.F/1 to F/9)

(4)

3 .00

3.00

1 .50

5.00

7.O060 Qr No.J.O.-1 occupied by Asst. Registrar

(Admn), Orissa High Court -

61 Qr. No.J.O.-2 at KVK road, Cuttack 7.50

62 Qr. No.J.O.-7 at KVK road, Cuttack 4.00

63 Q,r. No.J.O.-15 at KVK road, Cuttack(Jagannath Commissiort)

64 Qr. No.J.O.-18 at KVK road, Cuttackoccupied by Director, OJA

(oHC)

4.00

3.00

65 Qr. No.J.O.-22 at Stadium back side,

Cuttack (D'istrict Judge)

3.00

66 Qr. No.Bi i in C.B.-9 cccupied by DCP,

Cuttack (1s-r f Looi')

67 Qr. No.B/3 in C.B.-9 (occupied by D.G.

Vigitance)

5.00

5.00

68 Qr. No.B/9 in C.B.-9 (Occupied by Judge

Rajesh Ekka)

2.00

69 Qr. No.C/5 (Btock-1)in C.B.-6 (occupied by

Sri Biju Mathew, NLU)

2.00

70 Qr. No.C/4 (Btock-2) in C.B.-6 (occupied by

Dr. P.C. Prusty)

71 OSC Qr. No.1 & 2 near YMCA, Ctc

2,00

4.00- +oo72 Qr.No.8/26 to B/30 of SVP Sishubhawan,

Cuttack

Cuttack-ll

73 Pharmasist Qrs. in SCBMCH, Ctc (Qr No.'l )

74

75

8nos PWD Staff Qrs, SCBMCH, Ctc

Sweeper Line Staff Qrs, SCBMCH, Ctc (Btock

B)

S R toQtr NO HE 1 / 1 toHE 116

3.00

4.50

1.93

Total = 145.00

1.001

t \c t l9)\5PF\?Ai3 l9\At,tP 2O1E 1!\ t' lt4 | 2a)s 821 07 2018 CD\A M P Ee\a'-tLt.ot Res Pg_3a/56

17)

Name of ihe

1R&B) Division

(1)

st.No,

Name of the \(rcrks

2 S R to Btock No 0 of CCT Dept at New LIC

Colony, Badambadi Cuttack

: 5 R to Qr No 2RB of CCT Dept at New LIC

Cotony, Badambadi Cuttack

4 S R to Qtr No 2RAB20 at Otd LIC ColonyBadamabadi Cuttack

5 S R to OGP Staff Qtr F type G Btock,Nuapada Cuttack

6 S R to OGP Staff Qtr No |V18, Madhupatna,Cuttack

1t

1.00

1.00

1.00

1.00

0.50

7 S R to OGP Staff Qtr F Type K Block,Nuapada Cuttack

1.00

8 5 R to Res Buitding at Otd LIC CotonyBadamabadi, Cutack

0.50

9 S R to Res Buitding at Otd LIC CotonyBadamabadi F 66 and Type D 2 2

0.50

10 S R to ITI Staff Qt No 2RA at Otd LtC CotonyBadambadi Cuttack

1.00

11 SR to Res Buitding at OLD LIC Cotony 0.50

Unit AmcuntRequired

t41 (3) (4') (5)

12 S R to Res Btdg at Otd LIC CotonyBadambadi Qt No 2RA E 56

0.70

13 Si R to P.W.D. Staff Quarter of Banki(R&.B)Sub-Division for 2018-19(Such as

changing of A.C. Sheet roof to R.C.C. Roofof the Qr. Occupied by Sri Pabitra KumarBehera)

2.00

14 S/R to Revenue Staff O. At Banki for 2018-19(Qg. Occupied by Smt. Sanjukta Das,A.D.W.O.)

2.00

15 S/R to Revenue Staff Quarter at Banki for2018-19(Qr. Occupied by Sri MangutiPradhan)

16 S/R to'G'Type Qr. Of B.K. Bidyapitha atBanki for 2018-19.

1.00

1.00

17 5lR to SDH Qr. at Banki for the year 2018-19( Qtr. Occupied by Samarendra Behera)

1.00

18 5/R to SDH Clr. at Banki for the year 2018-19(Qr. Occupied by Basanti Datei)

'l .00

19 S/R to SDH Qr. at Banki for the year 2018-'19(Qr. Occupied by Ushatata Mahanty)

20 S/R to SDH Qr. at Banki for the year 2018-19(Qr. Occupied by Sandhyarani Dash)

'l .00

1.00

E \C.E.(B)\SPR\2O18.19\AL4P 2A18 19\a.M-P. 2O18 19.24 A7.2018 CD\A.tlt.p -Res.Cnttcot Res. Pg 3s/s6

C:J

t.l- -.=

.: '. =- (R&B) Djvis;or i

:r-l.l o

Narne Ci i!.= lr,ar|:! Llt :i AncJi,-Required

(1) (3)

21 5/R to SDH at Bankr for the year 2018-

19(Qr. Occupied by Brjayaketan Behera)

22 SR to Qtr No. D-2l5 occupied by Mrs Monita

Tripathy, Judicia[ Magistrate Second C[ass

at New LIC Colony, Badambadi, Cuttack forthe year 2018'19

73 SR to Qtr No. B/16 occupied bY Smt.

Basanti Routray Staff of Rand Division-ll atNew LIC Colony, Badambadi, Cuttack forthe year 2018- 19 (Balance work).

24 5R to Qtr No. L1125 of CCT Dept. at New

LIC Cotony, Badambadi, Cuttack for the

year 20'l 8- 1 9 (1 st f toor).

(4)

0.45

1.00

1.00

0.50

25 SR to U and V btock at New LIC Cotony,

Badambadi, Cuttack (Such as PLinth

Protection and Cover Stab) for the year

7018-19.

26 SR to Qtr No. E/1 to El4 at GED Cotony,

Badambadi, Cuttack for the year 2018-19

(Outside 1st floor).

1.00

1.00

27 SR to Res Buitding of Otd LIC Cotony,

Badambadi, Cuttack for the year 2018-'19

Qtr No. 7RA G/78 occupied by staff ofCCTax Dept. of Cuttack.

0.50

28 SR to Res Building of Otd LIC Cotony,

Badambadi, Cuttack such as Concrete

Ftooring and Plinth Protection of Backside

Qtr No. 2RA l/97 to l/108 and 2RA H/85 toH/96 for the year 2018-19.

29 Raising of CC road in front of Qtr No. Type

D-711 to D-7/ 6 f or the year 2018-19.

1 .50

1.00

30 SR to Res bui[ding inside Otd LIC Cotony,

Badambadi, Cuttack for the year 2018-19.

Such as providing fitting & fixing Retro

Reftective Staintess Steel Sign Board inside

Colony Campus. (Right Side).

31 5R to Res buitding inside O[d LIC Colony,

Badambadi. Cuttack for the rrear 20'18-19.

Such as providing fitting & fixing Retro

Reftectrve Stain[ess Steet Sign Board instde

Colony Campus. ( Lef l- Side).

1.00

2.00

f \ct./81\sPs\2o1.9 19,,At4.2O13 |i\A.'iP 2i18 19-2x A7 2018 CD:A]\,', P Res-C'.lticot R"" Ps_36/s6

(7)

5t.

No

Name of the \(o;-ks

(4t (5)(7) (3)

Name of tne

't{&B ) Division

Unit #Amou ntRequired

2.00

2.00

1.00

(1)

34

SR to Qtr No. F/1 to F/4 at GED Colony,

Badambadi, Cuttack for the year 7018-19.

SR to Qtr No. E-4l1 lo E-4/6 at High CourtCotony, Badambadi, Cuttack

SR to Qtr No. t-3/1 to E-3/6 at High CourtColony, Badambadi, Cuttack for the year

2018-19 (1st f loor outside).

33

35 5R to Qtr No. E-'1 /6 occupied by Smt.

Swapna Kar, Jr. Cterk of Judge Court atHigh Court Cotony, Badambadi, Cuttack

0. s0

36 SR to Qtr No. l/84 of CCT Dept. occupiedby Sri Surendra Ku. Dash, Peon at New LIC

Co[ony, Badambadi, Cuttack for the year2018-19

0.50

37 SR to Qtr No.U/16 at New LlC Cotony,

Badambadi, Cuttack for the year 2018-19(2nd ftoor)

1.00

38 SR to Res Buitding of Otd LIC Colony,Badambadi, Cuttack for the year 2018-19

Qtr No Type D-2l5 occupied staff of OPSC

Cuttack.

39 SR to Res Buitdinq of Otd LIC Cotony,

Badambadi, Cuttack for the year 2018-'19

Qtr No 2RA H/95 occupied by staff ofSurvey and Map Pubtication Odisha,

Cuttack.

0.50

0.50

40 5R to Res Buitding of Otd LIC Cotony,

Badambadi, Cuttack for the year 2018-19(Such as Cteaning drain bed and fixing RCC;

Drain Stab backside of Qtr No. 2RA F/6 to72 and G/73 to 84.

41 SR to Nuapada PHC Staff Quarter for theyear 2018-19.

'r .00

42 SR to Qtr No. A/8 occupied by Sri TusarKumar Pradhan, Cterk of Board of Revenue

Dept. at New LIC Cotony, Badambadi,Cuttack for the year 7018-19 ('lst ftoor).

1.00

Pg_371s6f \c6rB)lsDR\2oi3 l-o\AttlP 2O1t 19:A M.P. 2C1t.i9 2j C7 2C1E CD\A M P.-Res.Catt.ol Re\

1.00

(R&B ) D jvis:on r!oI.J:.,-.'r e of the Vy'crxs -.'ncurt

Require!

(1) \21 (3)

43 5R lo Qtr No. Al2 and A/3 occupied by Sri

R.N. Rath A.E.l. Section of Latit Kata

Acaciemy and 5ri Damodar Barlk, Auditor atNew LIC Colony, Badambadi, Cuttack forthe year 2018-19

44 SR to Qtr No. B/14 occupied by Sri SarojKu. Satpathy at New LIC Cotony,Badambadi, Cuttack for the year 2018-19

45 5R to Qtr No. P1169 of CCT Dept. at NewLIC Co[ony, Badambadi, Cuttack for theyear 7018-19

(4) (5)

1 .00

1.00

1.00

46 5R to Res Bui[ding of Odisha Govt. Press atMadhupatna, Cuttack i.e. repair of D Type

Qtr No-1 to 4 for the year 2018-19.

1.00

47 SR to Res Bui[ding of OLd LIC Colony,Badambadi, Cuttack for the year 2018-19

Qtr No Type G123, cl24 occupied by staffof Heatth Dept of Cuttack.

48 SR to Res Building of Otd LIC Cotony,Badambadi, Cuttack for the year 2018-19

Qtr No Type G/79 occupied by staff of AG

Odisha, Cuttack.

0.50

0.50

49 Construction of Extension GCI Sheet roofbuitding at OMP Square, Cuttack for theyear 2018-19 Qtr No. Temp Shed No-2occupied by Staff of Works Dept. atCuttack.

0.8s

50 S/R to zNos. Cterks Qr. of (ReB) Sub-Division at Banki for 2018-19

0.50

Tota[ = 48.00S/R to.....

Kendrapara 1 2nos.staff qrs. for M.N. High School, atPattamundai.

1.00

2 D. l. E.T. Hostel Buitding at Balia

3 6nos Staff quarter at Block colony,Pattamundai

2.00

4 Staff quarter 3nos at Pattamundai5 Constab[e quarter 5nos at Pattamundai

S/R to.. ...1 Staff Quaerters of Revenue Department ,

Jagatsinghpur

2.00

3 .00

8.00

Jagatsinghpur 5.00

E \C t |A)\SPR'\:A$ :t\\|t'tp :CtS i9\a M D 2O1S 19 21 A7 2O1E Ct\A Ll p te! ar rcol Re\

Total=

Pg 38/s6

Name of the'rl&B) Divtsion

\l-

- (1)

Panrkoiti

2 Staff Quaerters of DHH, Jaqatsinqhpur

S/R toCottector's Residence

ADM Residence

sub caLe:io;;s Residerrce

4 PD's Residence

1

7

3

Total=4.009.00

2.50

I .50

1 .50

5 Staff Qr. Of Vigitance Dept Jajput0. 50

2.006 Register CiviI quoter at Jajpur 1.00

5t.

No

Name of the \\/ci-ks Unit Amou ntReq u ired

(7) (3) (4) (5)

Total= 9.O0

S/R to.....Dhenkanal 1 S/R to Revenue quarter No. 27 at Hindot. 3.00

2 5/R to Revenue Qrs. No. 14 at Hindol. 4.503 S/R to Revenue Q5fs. No. R/'15 at

Dhenkanat.1.42

2.254 S/R to Revenue Qrs. No. R/13, Ri 16 & R/17at Dhenkanat.

5 S/R to Sub-Coltector Residence atDhenkanat.

4.83

6 S/R to CDMO quarters of District Head Qrs.HospitaI at Dhenkanat.

3.00

7 S/R to Soi[ conservtion office staff Qrs. atKamakhyanagar

2.00

Total= 21.0O

S/R to.....Angul 1 Cottector Residence, AnguI 3.00

2 S/R to 5ub-Cotlector Residence at Angut

3 Revenue staff qrs., Anqul

3.00

2.00

z.o04 Treasury staff qrs., Angul

5 S/R to DLO Qrs. at Angul 2.006 SDJM Qr. At Athmattik 1.00

7 M.O Qr. at Athmattik.8 Residence of Sub-Cottector (new)

1

1

00

00

9 S/R to Sub-Treasury Staff Quarters atPattahara

2.00

10 S/R to TahasiI Staff Quarter at Pattahara 2.00Total= 19.O0

S/R to. ....Charbatia 1 Asst. Engineer quarter of (R&B) Section at

Athagarh2.00

2 PWD staff qrs at Athagarh 1.00

3

4

Asst. Enqineer quarter at TigiriaSub-coItector residence at Athagarh

'l .50

1 .50E:\C.E.(B)\SPR\2A18 19\AMP20)8.19\atv,1.P.2O18 19 24 07 2018-CD\A.M.P Res.c,jtcot Res Pg 39/56

tt(\,, l.iame cf ihe

(R&B ) Divisron

(1)

Ganjam-l

.- iia ai lie \^/orks::,l'.lo

7

l

- .-:3-: - !

Require,'

(3) (4\ (s)

1 .50

6

I nos. Revenue staff qtr (Qtr. No' 1,2 A 3lr,

LIC cotony at Athagarh

ADWO qtr occupied by addt. Sub-cotlectorAt Athagarh

Addt. Tahasitdjr Qtr at Athagarh

0.50

7

Total =

1.00

9.00S/R to.....

i co,rao Sraff Qr 'E' Type z nos er No. t 1 & 2

at Berhampur

2 PWD staff Qtrs no 1 R - 4 to 12 atBijipur, Berhampur

2.00

5.00

5.003 SESC(ReB) Residance,Berhampur

4 Principat quarter of Nursing Cottege

M. K.C.G.,MC&H,Berhampur3.00

5 PWD Staff quarter at Digapahandi 5.006 PWD staff quarters 2R at Bij ipur, Berhampur

7 Tahasitdar and Addt Tahasitdar Qtrs atchikiri

B Additiona[ Tahasitdar Qtrs at Digapahndi

5.00

5.00

3.00

5.009 C.H.C. Staff Qtrs at Hinjiti10

11

PWD staff quarter at courtpeta ,

Berhampur

S.F.Vlgitance Staff Quaiter at lndiraNagar, Berhampur

5.00

5.00

12 Dist. Education Officers'quarter atBerhampur

3.00

'1 3 C.D.M.O. Qtr at Berhampur 3.5014 PWD SDO qurtr at Digapahandi 3.0015 D.l.C General Manager quarterBerhampur 2.50

_l16 PWD staff quarter at Pudamari 2.00

Total = 62.00 .lS/R to.....

Ganjam No.ll 1 Cottectoter residence at Chatrapur_1

2 3R qtr 2 nos. of Revenue Dept. AtChatrapur and 2RB - 23 nos.

4.00

4.50

4.00

4.00

3.00

3.00

3

4

5

6

Asst. Surgeon qrs at Chatrapur 2 nos

E type qrs e noi a '.iype + nos

Chatraour.

G type qrs 4 nos at Chatrapurs.D type qrs 5 nos at Chatrapur.

at

E \C.t.lts)'\3PR\\2o:S:9'r,",.i.loi.l ti-ri rr'i a :C:8:9 2: C7 2o1E-CDl,A.tvt p Re5 C.jtitot R?s

qrs

Pe_4o156

l..: -

Name of ihe'r.&B) Division

(1)

\6

7 2 nos E type & 1 F type qrs atPurushottampur.

4.00

2.90

3.50

4.10

4.00

8

9

10

VeterinaryTahasitdar

Veterinary

staff qrs. at Chatrapur

qrs- At Khattikote

staff qrs. at Khatlikote

11 Special Repair to R.l.T.E. Buitdings atRangeitunda such as rmprovement ofinternal road of Staff Quarter

Total= 41.OO

S/R to.....Bhanjanagar 1 Tahasil Staff Quarter at KSNagar 2.O0

2 Officer's quarter of Revenue Department atRev. Colony at Bhan anagar

3 Tahasil Staff Quarter at Potasara

3.00

1.00

4 Sub-Registrar Staff Quarter Buguda 2.00

5 H.C. & U.D. Qrs of Dist Agriculture staff at Aska

(2Nos)6 A.C.C.T. Staff quarters at Bhnajanagar

2.00

2.00

7 S/R to Tahasildar Quarter at Sorada. 2.00

Total= 14.OO

Un itSI

No

Nai-ne of the Works(

Amou ntRequired

(7) (3) (4\ (5)

S/R to.....Phutbani 1 S/R to l.P.Os Quarter at Phutbani. 0.60

2 S/R to Agricutture staff qtr at Phutbani.

3 S/R to 2 Nos of PWD staff Qtrs at G.

Udayagiri (R&B) Section.

0.49

1 .00-

4 S/R to Res buitding such as Sub-Treasurystaff Qtr at G. Udayaygiri.

5 S/R to Res building such as repair toTreasury colony,Phulbani.

6 S/R to Res building such as repair atNadikhandi Sahi Phutbani.

7 SlR to Res buitding such as repair toTreasury cotony,Phutbani.

8 S/R to Res Buitding such as repair to NGO Qr.,Phutbani

9 S/R to Revenue Qtr No. 04 under G.

Udayagiri TahasiL

1.00

0.40

0.50

0.50

2.43

1 .55

10 S/R to Revenue Qtr No. 03 under G,

Udayagiri Tahasil

11 SlR to Revenrre Qtr No. 06 undei'GUdayagiri TahasiI

12 S/R to Qtrs of Heatth Department at CHC

G. Udayagiri

3.25

1^O

2.79

t \c.E.l8)\sPR\2A18 19\AMP 2018 La\A ti.P 2018.1-o 24 A7.2C18 CD\A M P. Bes Ctit,co! Re! Pg_a7/s6

rr-...^ ^-- -l-.^

(REiB ) Divisron

(1)

Boud h

5i

No

Ur l

i

.l

.(3Require,l

(3) (4) (s)- --

Total = 18.00

13

45

S/R to..,,.2 Nos. Rev. Staff Qtrs. (No 19 &

Rev. Staff Qrrs. (E/77 &E/78)Rev. Staff Qtrs. At Master LineP.A Io Cottector QuqrlslL.l. C Cotoney Staff Quarters

6 AD.M Qtrs near Hanuman Temple7 7 nos L.l.C Colony staff qtrs

8 Cotlector Res. Boudh

76) 0.90

1.001.001.001 .00

0.401 .00

9 5ub-Cotector Res Boudh2.00

1.7010

11

ADM Res. Boudh 1.00Tahasitdar Qtr Boudh 1.00

12 Addt. Tahasildar Qtr Boudh 7.0013 PWD S.D.O.Atr Boudh

14 PWD S.O.Qtr Boudh

2.00i.oo

Total = 18.00S/R to.....

Balliguda 1 S/R to SDO Qr. East such as washing,Painting, Door & W'indow Repair atBattiguda.

1 .00

2 S/R to East Section Officer Qf. such as

Washing, Painting, Door & Window Repairat Battiguda.

3 S/R to Agricutture Staff Qr. 5 nos. Such as

Washing & Painting, Repair to Door &Window and Leak Proof at Baltiguda.

1.00

1.00

4 5/R to SDMO Qr. Such as Washing &Paint'ing, Repair to Door & Window atBattiguda.

2.00

5 Revenue Qtrs. 8 nos at Balliguda forministriaI staffs.

2.00

6 Revenue Qtrs. Near Tribadi Park 2 nos. atBattiguda.

1.00

7 P.W.D. Qtrs. 7 Nos. (St. No. 1 to 7) atSunapanga, Batliguda.

2.00

1.00

1 .00

1.00

13.00

3.00Koraput

8 Staff Qtrs. Veterinary Dispensary 2 nos.,Battiguda.

9 Tahasitdar Qtr. at Baltiguda.

10 S/R to S.D.O.'s Res. At Daringbadi.

(/R to. ....1 Repair to Sub'Cottectoi nesiaenie

E\C.t.lB)\'PR\201t19\/.tt1P2C:S:91..yP:O:3:92rAi2t3Ca\ai"tp Res cnrcat-Re:

Total=

Pg_42/56

(2)

fr:', = O; ait= i/,/Cr11S

llarne of the- ,iB) Divtsion

U nit A.nountRequired &

(1)

2 Repair to SDVO Residence

i Renair to Asst. Aqricutture Officers Qtr. At

koraput

4 Repair to 10 nos. Revenue Qtr. At Court

Iine

5 Repair to Qtr. No-21 to 30 at Poda line

6 Repair to 4 nos. D.B Qtr. Near Siva Tempte

7 Repair to 2 nos. Revenue Qtrs. Near

Tetephone Bhaban

8 Repair to 6 nos. Peon Qtrs. Near

Kataniketan

9 Repair to 3 nos. Officers Qtrs. Near R.l

Office

1 .50

1.00

1.00

2.00

2-00-

1.00

2.00

2.00

10 Repair to 1 no. "D" type Qtr. At 7 no

officersCotony

1.00

11 Repair to 1 no. Cterk Qtr. Near P'W.D

Colony (Post Offic Road)

1.00

12 Repair to Principal Qtr. At Govt. Cottege,

. Koraput

2.00

13 Repair to 2 nos. "E" type Qrs. of Transport

department near DIG Off ice

1.50

Name of the Wcrks(

No

i

(4) (s)(2) (3)

Repair to DNK staff Qr. no" SRBG-

4,5,7,9,16,17,26 (7 nos.) at KoraPUt

Repair to DNK staff Qr. no. DRBC-9 to 13 (4

nos. ) at Koraput

1.00

2.00

7.00

2.0074

i.oo

2.00

20 Repair to Q.r. no 2R-11 13 t 11 / 4 at AEF

Cotony, sunabeda

21 Repair to Qr. no 2R-44l3 & 44/4 at AEF

Colony, sunabeda

22 Repair to DNK staff Qr. no SRBD- 13 to 16

(4 nos. ) at Koraput

25 Repair to DNK staff Qr. no.D1 11, D1 17,

D1 I 4 (3 nos. ) at Koraput

14 Repair to PWD Qtr. no-48 & 49 2.00

15 Repair to PWD Qtr. no-'17 1,00

16 Repair to 4 nos. "E" type agricutture staff

Qr. at korpaut

2.00

1.0017 lRepair to I no. "E" type Qtr. Of StatisticalDept. in L.l.C Cotony

18 Repair to A.R.C.S Qtr. At Koraput 1.00

19 Repair to Qr. no 2RA-30/3 & 30/4 at AEF

Cotony, sunabeda

1.00

a \aEiE)\sPn\2O1S 19 ANlF 2O18.ig\A.tt1P.'2A78 19 21-A7 )01B CD\A t'4.? Re5Cttit"',F''\Pe a3/s6

(R&B) Division o

S

N

Na,t::, ai':'"rai,.s

\)A.r.o-r i -

Req u irt(1) t7) (3) (4) (s) '

26Repair to DNK staff Qr. no. DRBB- j to 5 {5

77

nos. ) at Koraput

Repair to DNK "F" type staff er. no. F /13,F / 14 (2 nos.) at Koraput

ADM Res. Koraput

PWD Qtrs No.35 occupied by J.E.Estimeter.

78

29

S/R to.....R to otd vigilance staff e5s. at Jeypore

R to otd vigitance staff ers. at Jeypore(Part-A)

3 S/R to Vigitance New Cotony 2 Nos F-TypeQtrs( No 2 & 3) at Jeypore.

4R epair & Renovation of euarter of Tutorsof ANM Training Centre at ANM, Jeypore

2.00

2.00

2.00

1.00

Jeypore 1 S/

Total= 47.OO

2.00

7S/ 2.00

4.O0

2.00

5 S/R to drain of DIET staff qtrs. at

6 S/R

Medristreet, Jeypore

to Vigitnace DSP Quarter (occupied bySri Kutu) at Jeypore.

5.00

1.00

Total = 16.00S/R to.. ...

Nawarangpur 1 Vigil lance Staff Quarter, NabarangpurRevenue Staff Quarter, L.l.C. Cotony,Nabarangpur

24.00

5.00

3 Executive Engineer Res at Nabaran gpur 4.004 Medical Staff Quarter at Nabarangpur

(Doctors Quarter)5.00

5 Veterinary Staff Quarter at Umerkote 7.00Total = 20.00

S/R to.....Matkangiri '1 PWD (R&B) Staff Quarters at Matkan grn 2.00

2 Revenue Quarters at Matkang.iri 2.003 Col[ectors Residence at Mal.kangiri4 P. D's Residence at Matkangiri

2.00

3.00

Total= 9.00

Rayagada- |

S/R to.....1 5/R to Sub cotlector Res, RayagadaI ! I P 1o Pss .f {!t\4 p:.v:q:<j:

3 S/R to Agricutture staff etr, Rayagada4 S/R to Soit Conservation, Staff qtr,

rayaqada

2

2

00

0c

2.00

2.00

t \C.E (B)\SPR\2O18 tg\ALlp 2O1B 1,a\A t\r p 2o1B 19 ). C: ?O ji CDt.,\ 1,1 p Resartl,coi F.er Pg a4/56

5t

No.

Name of the \(orks

(s)(4)(2) (3)

Nai-ne cf the.&B) Division

Unrt (dAmou n tRequired

(1)

Rayagada- I I

S/R to.....1 2 Nos D type Qr for Medjcal staff Qr at

Gudari

Z ilR to Doctor Quarter at Gudari

3 1 No E type Staff Qr for Asiistant Coltector

4 4 Nos E type Qr Revinue Staff Qr near Sub-

Tresary Gunupur

S/R to.....

Total= 8.00

2.00

1.00

1 .50

1 .50

Total= 6.00

ParaIakhemundi 1 Repair & Maintenance of Residence ofCotlector, Gajapati at Paralakhemundi

3.00

2 Repair & Maintenance of Residence of Sub-

Cottector, Paratakhemundi.

1.50

3 Repair & Maintenance of Residence of ADM,

at Paratakhemundi.

1.00

4 Repair & Maintenance of Res. Of E.E. (R&B)

Divn at Paratakhemundi.

't .50

5 Repair & Maintenance of Staff Qrs. Of

Judiciat Deptt. at Pkd.

2.00

Total= 9.00

S/R to.....Sambatpu r- | 1 S/R to Qtr No-8 and 23 at Commissioner's

Cotony, Sambatpur for the year 2017-18-

(Occupied by Brundaban Pradhan -Sr. Asst.

i&. Santosini Bhoi- 5r. Asst. o/o RDC N-D.

Sambatpur. )

1.72

2 Repair and Renovation of the Govt.

Revenue Staff Quarter No-3R/'t 12nd Ftoor)

at LIC Cotony Modipada, Sambatpur for the

year 2017 -18.

2.50

3 S/r to Qtr No-30 (2Ra) at Llc

Motijharan, SambatPur OccuPied

Sahu of Cottectrate for 7017-18.

Cotonyby P.K

3.3 3

4 S/R such as Repair and Renovation of QtrNo-8 D.C. Cotony Occupied by Cottector

Staff at Kacheri Sambalpur for the year

2011-18.

4.79

E \C E (3)\SPR\2O15 1g\Atvi,2O:3 1g\A.i"1 P 2AiB'i9'21 A7'2C13CD\AMP RetCrttt'it Pe''Pg_a5/56

TI

at Gunupur

.[)'

(R&B) Divislon t.ro

\::ne of the v. y'c:k: li^r-

Require '

(1) 2 (3)

5 5/R to Qtr tlo.2RA-47 at LIC Cotony.Motjjharan, Sambatpur Occupied by Sri S.K.Behera (Vrgitance Dept.) for the year 2017-18.

6 S/R such as Repair and Renovation of etrNo-2RB/21 at LIC Colony, Motijharan,Sambatpur for the year 2017-18. (Occupiedby:- Sri Amutya Ku. Dansina (Senior Cterk)of Dr. PMIASE, (Bed. Cottege, Sambatpur)

(4) (s)

2.98

3.27

7 S/R to Qtr No 2RB-1 at PWD Cotony, BrooksHitt at Sambatpur for the year 2017-18. (etrOccupied by Mis lndira Das)

1.64

8 Repair & Renovation

Quarter Occupied byDivision-ll, Sambalpur.

of thes. D.o.

Govt.(R&B)

StaffSub-

4.86

1.469 5/R to Qtr no-F-1 near Office of theSENC(ReB) Sambalpur, Sambalpur.(Occupied by Markanda Chand -Choukidar)

10 5/R to Qtr No. 2RA-42 at LtC Cotony,Motijharan, Sambatpur occupied by NirjanPradhan (Vigitance Dept.) for the year 201718.

11 S/R such as repair & renovation to etr No.3R-17 at Agricutture Cotony, Modipara,Sambatpur (Now occupied by Sri prafuttaShetty, Agnomist)

3.96

2.91

12 5/R to Qtr No. PWD O.P-15 at potice

Cotony, Sakhipada, Smbatpur for the year7017-18. (Qtr Occupied By Sri prasanta

Kumar Nayak, l.G. Staff, Sambatpur)

0.50

13 S/R to Qtr no. C.B-11 at Vigitance CotoneyNear Jai[ Chowk, Sambalpur. (First Ftoor)Vigitance 5taff Qtr)

0.25

14 S/R to Qtr No 2RB-3, 4, 7 &B (VigitanceStaff Qtr) at Vigitance Cotony, (Near JaitChowk) Sambatpur.

Vigilance SP Res'idence at Samba[

?.95

1 5 S 1R srrch as repa'ir and renovation c{ l04

E \C.t |B)\,SPR\2018 La\,At\tP 2O1l 1.a Atul ..207:t1921,07201tar.,,\1 D Res C.tttcai Rc,.

pur

Ps_a6/sG

(7) (3) (4) (s)

Name cf ihetR&B) Divtsion

st.

No.

Name cf the \{crks

16 S/R to Qtr No. PWD-160 in R

Sambalpur for the year 2017 18.

By Sri K.P. Sinha-ASj)

17 S/R to Staff Qtr of Education Departmentat LIC Colony Rairakhol

18 S/R such as Repa'ir and Renovation of MVI

Qtr RTO Cotony, Sambatpur

Un it Amou n tRequired &

P Line at(Occupied

I .68

1.49

4.75

Total = 52.00S/R to.....

Sambatpur-ll 1 S/R to residentiat buitding such as repairand renovation to Qtr No.C2, D1 , D4, D6,

E3, E8, E1 /7, etc (providing CR sheetshutter) of VSS IMSAR, Burta

4.85

2 S/R to Residentiat Buitding such as

providing ptastic felt to Quarter No. 3R/3,3R/4, 3R/5, 3R/6,3R/7, D-3, D4, 3R/13,

3R/14 & 4R/5 of VSS IMSAR, Burta

4.51

3 S/R to Residential Buitding such as

providing plastic felt to quarter No. F8, F9,

F10 & Grading concrete to D3, D8, D2, C2,

C5&6, D7, D11, D12 & 2RB/13 of VSS IMSAR,

Burta

7.92

9 Si R such as construction of Garage,Watchman Room &. Driver Rest Shed for theResidence of Executive Engineer,Sambal.pur (R&B) Division No.ll for the year7017 -18 (Roofinq. ceilinq. door windowf ixing, ftooring & painting)

7.25

4.03

4-84

I .96

7 S/R to Sub cottector res at Kuchinda

10 5/R to Staff Qtr No. F31 l4 of lTl Hirakud

8 S/R to Res buitding of Agricuttural Dept atKuchinda such as Head Clerk qtr & A.A.O

Qtr

4 S/R to Residential Buitding such as repairand renovation to quarter no. 2RB/1,zRB/9,7R8t25,7RB/26, 3Rt9 &. 1R/162 0fVSS IMSAR, Burta

5 S/R to Revenue Qtr. Near PWD SDO quarter:at Kuchinda

6 S/R to Sub-Coltector Staff Qtr. (Revenue

Dept. ) at Kuchinda

3.91

1.66

4.07

E.\C.E.iBt\SPP,\,?Ai8 B\aMP 2018-19\a M.P..2O18 i9 2a-07 2018-CD\a M P Res Cnttcat Res Pg-471s6

(\'4.,Name of the

(R&B) Division

sr.

No

\ a::e of rii= \/Vcrks Ur,. , -:!:!

Rec rrire,l

(2) (3)

S/R to... . .

2no 'E'type Qr of Revenu Depart ment atDeoqarh

lNos "D" type Qrof Revenu Department atDeogarh

3 Repair & Renovation A.D.M. quarter atDeoqarh

4 Vegtance staff quater iOnosf; type quater)at Deogarh

(4) (5) :-Total = 37.OO

Deogarh 1

7

2. 00

1.00

3.00

3 00

5 Repair & Renovation of Assistant Sub-jaiterquarter at Deogarh

3 .00

6 CDVO Qr at Deogarh 3.007 V.S.S qrs. of at Deogarh

8 D.R.C PrincipatStaff quarter at Deogarh 3.009 D.R.C Lectur quarter at Deogarh 5.00.10

D.S. P quarter at Deogarh 2.0011 Aditionat S.P quarter at Deogarh

Total= 25.00S/R to.....

Jharsuguda 1 Staff Qrs at Mining at Jharsuguda 4.002 Staff Qrs at C.T.O. at Jharsuguda

3 Cotlector res at Jharsuguda

4 Revenue Qrs Jharsuguda

4.O0

4.00

3.O0

:.oo5 Tahasitdar Qrs jharsuguda

6 Tahasil office Staff Qrs at Jharsuguda 4.00

Total= 22.OO

S/R to.....Baragarh 1 S/R to Georqe High Schoot Bargarh such as

repair and renovation to Head Masater,Bargarh.

7.00

2 Repair and renovation to Principal Qr. OfPanchayat Cottege, Bargarh

1.00

3 A.C.C.T. staff Qr. Occupied fby D.A.O (LFA)

Bargarh.3.00

4 S/R to Cottectorate Res. at Bargarh.

5 S/R to Sub-Co[tectorate Res. at Bargarh

6 S/R to 6Nos. Of otd staff qtr. At Bargarh.

2.001 .50

7.OO

1.50

1.00

7 SIR to otd BNos. qtr. At Bargarh.

8 S/R to 2 Nos. of 2R Revenue Qtr. AtAtta bira.

E.\C t (B)\SPR\2C1E.-!g\At,19 2O1E 19\aLt p 2019 1.9 )4 A7 2O18 CD\,A.M.p Res Cr,cot-Res Pg_48/s6

(1)

(7) (3) (4) (s)

Na-me of iher?&B) Divisron

(1)

s l..

No-

Name of ihe Works

9 S/R to 3R qtr 2 nOs. of Heatth Dept. atAttabira.

10 S/R to 8 nos E-type qrs of Revenue

department, Padampur

11 5/R to fanisitaai quirter at Padampur

U nit AmountRequired o

1 .50

1.00

'1 .50

Total= 18.00S/R to.. ...

Bolangir 1 Finance staff Qtrs, Batangir

2 Heatth staff Qtrs, Batangir

3.00

3.00

3 S.E Res. ,Batangir 3.004 E.E. Res, Balangir 2.00

5 S.R to revenue buitding quarter No.251l2Roccupied by S. Mishra

0.50

6 Repair toSita Rani

Office

Revenue buitding occupied by

Padhi, peon, Sonepur Tahas'iI

0.50

7 Repairing of Revenue Quarter occupied by

Sarat ch. Sardeo at LIC Colony, Sonepur0.50

8 Repairing of Agricutture Staff quarter F/13at Sonepur occupied by LiLambara Sahu

0.50

9 Repairing of Revenue Quarter 4 Nos, atBtock Chowk

1.00

10 Rapairing of staff quarter F3l1 at Agricutturecotony occupied by Samdip Mishra

0.50

11 Rapairing of staff quarter AG F/6 at Agriculturecotony occupied by Amita Mahakud

0.50

12 Rapairing of Govt, staff quarter 2RA/6 atLIC Cotony occcupied by Sunit La[ Mandal

13 PWD Staff quarter 2 Nos. at Sonepur

0.50

1.00

, 14 Cotlector Residence at Sonepur

15 Education Deptt. Staff querter 4 Nos. nearDl Office

1 .50

1.00

Total= 'l 9.O0S/R to.....

Kantabanji 1 Sub Co[lector Residence at Titilagarh1 Sub-Tresury Officei- quarter at TiiiLagai-h

3.00

2. 5C

3 Sub-Register Qx{ter 9i r1llt9ggrrr4 Sub Cottector Quarter at Patnagarh

1 .50

3.00

Total= 10.00

E \C.t.(B)\SPR\2A13.19\,AMP 2018 t9\A M.P.-2A18 8.24 A7 2O18 CD\A M p.-Res Cittcor Res Pg-a9/s6

i{: rn: :i rhe(R&E) Divisron

(1)

Sonepu r

isr r i= !":i-l-'.s Unit .1.- a, n -

Req u r rer.'{ No

(7) (3)

S/R to.....'l [-lC Quarter at Birmaharajpur

2 Si R to E Type Quarter at Revenue Deptt. AtSonepur

3 S/R to Revenue Quarter oi LIC Cotony at Sonepur

4 Construction of C type quarter for MedicaI

Department at Sonepur

5 S/R to 2 Nos. Quarter of Sub-Divisional

Hospitat at Birmaharaj pur

6 S/R to Sub-Cottector Staff quarter atBirmaharajpur

7 ADT Staff Quarter at Sonepur

B 4 Nos. PWD Staff Quarter at Sonepur

(4) (5)

1.00

1.00

001.00

2.00

1.00

1.00

1.00

9 4 Nos. Staff Nurse Quarter at Sonepur

10 Tahasil Staff Quarter at Birmaharajpur

2.00

1.00

11 5/R to Coltecor Res at Sonepur 1.00

12 R.l. Office at Tarbha 2.00

13 Tahasitdar Quarter at Tarbha

14 Tahasit Siaff Quarter at Tiibha - 3 Nos.

2.00

1.00

1.0015 Medical Staff Quarter 4 Nos. at Tarbha

Total= 19.00

S/R to.....Katahandi 1 S/R to 1 No of staff Of Labour Office at

quarters Bhawanipatna1.00

2 S/R to 1 Nos Medical residential staffquarter at DHH at Bhawanipatna

1 .30

3 5/R to 4 Nos Teachers quarter at Junaqarh

Govt. H.S.

3.00

4 5/R to 2 Nos of staff quarters of lTl

Bhawanipatna

3.00

5 S/R to G.M. quarter for D.l.C.Bhawanipatna

2.00

6 S/R to A.G.M. quarter for D.l.CBhawanipatna

7 S/R to Residential qrs of Dy. DirectorBhawanipatna

8 S/R to 6 Nos staff quarters for DDA

Bhawanipatna

9 S/R to 1 Nos Agricutture staff qrs at New

LiC cotony Birawanipatrra

10 5/R to Collectors Resrdence Bhawanlpatna

1 .50

2.00

2.00

1.00

2.00

Fr \C E (8/ \sPF \2or t 19\AMP 2018 19\A tr' P 2018 19 27 07 2013 CD\,j. ttt P Re3 Cau(ot Res Pg_s0/s5

1

Name of the/F &B) Divisron

st.

No.

Name of ihe \(orks

S/R to 5ub-Cotlector ResidenceBhawanipatna

S/R to Tahasildar quarter at Dharamarh

5/ R to Sub-Cotlector Residence Dharamgarh

Unit AmountRequired

3 .00

6(1)

11

12

13

I .00

4.20

14 S/R to Sub-Registrar quarter at Dharamgarh

15 S/R to Revenue staff quarter atDharamgarh

2,00

2.00

Total = 32.00S/R to.....

Khariar '1 5/R to Res.Buitding of H&F.W.Qtr.No.D-1

,D-2,E-10 & E-1'1 such as tarfe[tingtreatment at Nuapada.

3.00

2 S/R to Renovation to PWD Qtr.No.6 atNuapada.

0.47

(7) (3) (4) (s)

3 S/R to Qtr.No.H&FW- 17,13,16,18 &4Nos.'E'type Qtr. at DHH, Nuapada.

4 S/R to ACTO Qtr.& Staff Qtr.at Nuapada

Circle, Khariar Road.

2.00

0.58

5 S/R to 10 Nos'E'type Qtr.for Co[tector staffQtr.No.10 at Nuapada.

o0

6 S/R to PWD staff Qtr.No.13 at Nuapada. 1 00

7 5/R to Revenue staff Qtr.No.4'l atNuapada.

1.00

8 S/R to PWD staff Qtr.No.8 at Nuapada. 1.00

9 ,S/R to Qtr.No.01 of DPO Campus atNuapada.

7.00

10 S/R to Addt.Tahasitdar Qtr.atNuapada(Rev. -R-61 ).

1.00

Total=r 13.00

Batasore- |

S/R to.....1 Repair and Renovation the Sub-

Cottectortes Residence Balasore for 2017-18 (Repair of Garrage)

0.50

2 Repair and Renovation to "E" Type

Quarter No-2 at Commercial Tax OfficeCotony at Batasre

3 Repair and Renovation to F.M. theCottege Staff Quarter near Principalquarter at Balasre

0.50

0.50

E:\C.E.(B)\5PR\2A18 19],AMP 2A1A 19\A.M.P. 201E 19 2107 2O18-CD\A.M P.-fres Ctii(al Res Pg_sl156

1!t

\: = Ll ! =(R&8 ) D jvjsjon

(1)

l.lc

Nanre cf t.=',r,rc:KS Un:t Amotit:Req irire,i

7 (3)

4 Repair and Renovation to the Cotlege

Staff Quarter of F.M. Coltege at Batasre

5 Reparr and Renovatron to "D" Type Qr.F.M. the Cotlege at Batasre

O neparr and Renovation to 36 "F; typequarter No-1,6, 9, 10, 11, 17, '1 3,18, 19,

20,77,27 at Rajabagicha Balasore

7 Repair and Renovation to the CottectorResidence Batasore such as ProvidingName ptate Gtow Board and Tarfetting tothe damaged patcg of roof of the Res

(4t (s)

0.50

0.50

5.00

0_ 50

8 Repair and Renovation the ColtectorteResidence Batasore such as inside wa[[ ofDrawing Dinning Bed Room

0. s0

9

10

Repair and Renovation to CottectoreteResidence at Batasore Such as inside and

out side wa[[ fin'ishing (on Tranfer Coce)

nepiir ana nenovati,on 1o SuU-Colt".tor.Residence Batasore (Such as terfelting on

Roog Top

2.00

0.49

11 Repair to E.E. (R&B) Residence nowoccupied by S.E.E.C. (R&8) Ba[asore

0.50

'12 Repair and Renovation to lTl Staff quarterOccupied by Shyama Jena at lTl CotonyBatasore for 2018-19

1 .50

13 Repair & Renovation to "D " type Quarterat Rajabagicha Balasore (Such Drain &stiding Window and Colouring )Occupiedby Sri Ganesh ch Routh

1.00

'14 Repair to Out House attached to S.E.E.C.(R&B) Residence at Ba[asore such as fixingfixing of AC sheet roofing & Painting Work)

0. s0

'15 Repair to E.E. Residence at Batasore

Total= 16.00

1 .51

Batasore- I I

S/R to. ....1 4 Nos "D" type Quarter of G.K. Bhattar

Haspital at Jateswar

2 Rr R ro 2 rros 'F" type qr at RTO Otfice stafrat Batasore

3 R/R to 2 nos "D"type for RTO & M.V.l. atBalasore

3.00

4.00

6.00

E I C 5. /8) \SPF \2ri 8 r9\tMP 2A18 i-o\a.M P 201919 21 A7 20tB CDta Nt P qe.Cfltt.ot Res Ps s2/s6

(i

Name cf the Works Unit Amou ntRequired

(2) (3) (4) (5)

I

I

tNa me of the

/'?&B) Division

(1)

5t.

No.

4 R/R to 4 nos Doctor Qr D/S Ftat type atDHH Batasore

5 R/R to 5 nos Doctor Qr single storied atDHH Balasore

6 R/R to DAO Quarter at Batasore

S/R to.....Bhadrak 1 A.D.M.S RESIDENTIAL

UI

3.00

4.00

4.00Tota[= 24.OO

1.00

2 SUB-REGISIAR QRS AT DHAMNAGAR 1.00

Total= 2.0O

S/R to.....Mayurbhanj 1 S/R to lndian Officer Qrs.at mining cotony

at Baripada occupied by Vigitance Judge

3.30

2 to Hoste[ of K.N.G.High schoo[ at Baripada.(Hostel & Supdt.Qrs.)

3.00

2.203 Repair to MKC High School Staff quarterocc by Bijoy Kumar Nath, HostelSuperintendent at Baripada .

4 S/R to Watchman Qtr. 2 Nos located inside:camous of Cuircuir house Baripada.

0.50

3.30

0.80

2.O0

2.30

1 0 Repair to Ex- lnvestigation 5ub-DivisionOccupied by B.K. Sethy (A.8.) at Baripada.

11 Repair to P.W.D. staff Qtr near E.E. (R&B)

Residence at Baripada Occupied byGaneswar Sahu, Peon.

12 5/R to Staff quarter M.P.C. Junior Cottegeat Banpada . Now occupied by A. Nayak

13 S/R to DCCT staff Qrs.at Baripada .

occupred by R.N.Satpathy, S.Majhi,S. Patra, P.Jena)

5 S/R to 2 nos Compounder quarter of D.H.H.Baripada.

3.00

6 S/R to Staff Quarter of D.H.H. Baripada .

(Now occupied by Dr. Biswajit Nayak)2.00

7 S/R to Compounder Qtr of CDVO Baripada .

(Now occupied by Sri /vlattick)2.00

2.60

4.00

a

9

S/R to 'E' type Staff quarter of D.H.H.Baripada.

S/R to D.W.O.Qrs.near L.l.C.office atBaripada.

E \C E (E)\SPR\2O18.19\aMP 2O1a ig\A.M.P 2Ci8-19 21 07.2078 CD\A Ll P Res Criltcol Res Pg_s3ls5

Nam€ ai tfa(R&B) Divjsion No

lra:re of ihe Works AiountRequire,'t*

(1) t7) (3)

14 !,/R to SorI conservation staff qrs.(2 nos)

near Stadium at Baripada. (Occupied by

R.5.Ba[a h A.C.Gi111

S/R to.....1 ZNos -terk

Qr at 2nd PWD Cotony ,

Rairangpur (R&B) Division

2 Cterk Qr at 1 st PWD Cotony ,occupied by

A.E (ReB) Section No.l Rairangpur

(4) (s)

7.00

Total= 3 3.00

7.10

0.60

Rairangpur

3 2 Nos Cterk Qr at 1st PWD Colony ,

Rairangpur (R&.B) Division

4 Anti-termite treatement forGovt. Residentiat buitding of Rairangpur(R&B) Section No.lll

1.00

2.55

5 S/R to Compouder Qr. SDH Karanjia 0.50

1.256

7

S/R to Storeage godwn & Butt shed ofvetty. Deptt. (Occupied by A.V.A.S.) atKaranjia

sin to i*in t typ" a singte "E type(R.H.S. Qr.) of Sub-Co[tector Office staff atKaranjia

2.00

Tota[ = 10.00

S/R to.....Keonjhar 1 Repair to Cottector & DM's Bunglow

conference Ha[[ at Keonj har.2.00

2 Repair to Civil SDO Qrs occupied by ADM,

Keonj har.

1.00

3 Repair to P.D. DRDA Qr infront of TariniChhabighar at Keonjhar.

1.00

4 Repair to Jr. Auditor Qr opposite of Dy.

Cot[ector Qr at Keonjhar.1.00

5 Repair to L.D.C. Qr occupied by Steno toColtector at Keonjhar.

6 Repair to 4 Nos. L.D.C. Os at Dhobadiha,Keonjhar.

1.00

2.00

7 Repair to Twin 'E'type Qrs infront of Govt.Girts High School at Keonjhar.

B Repair to Twin'E'type Qrs (4 Nos.) nearl.T. D.A. Cotony at Keonjhar.

9 Repair to Revenue Statt Qrs occupied by

Purna Singh, Amin at Dhobad'iha, Keonjhar.

2.00

2.00

2.00

6\f E/ErlsPlr2O18 1-'\!,MP2O1E 19\.. ti': P 2At€1921 07 2AJ8 CD\AM.P Res.Crltttoi Res Pg_s4/s6

I in';

Name of the'rl&B) Division

(1)

st.

No

10

e

11

17

Repair to 10 Nos. E'type quarter for staffof Tahasit, BarbiI

Repair to Staff Qr. 2RA Bnos, Joda

Repair to C'type Qr 3nos, Joda

2.00

2.00

2.001 3 Repair to 'l RA Qr 4nos., Barbil 1 .50

14 Repair to 2R 2nos. 'F'type Qf for MiningBarbiI

7.00

15 Repair to 3R 2nos. Mining Btock, BarbiL 7.50Total= 26.OO

Ghatagaon

S/R to.....1 R/R to S.D.M.O quarter of 5.D.Hospital at

Ghasipura.2.00

2 R/R to D.A.O Quarter at Ghasipura. 2.003 .R/R to Revenue staff quarters at

Ghasipura.8.00

Name of the \A/orks U nit Amou ntRequired

(2\ (3) (4) (5)

8 Additionat SP Qtr at Sundargarh 7.509 i 2.00Govt. Cottege Staff Quarter

S/R to.....

5 F-Type Qrs at New LIC Cotony at Rourkela

Rourkela 3.00

3 .00

1.00

1.00

2.00

2.00

3 l.T.l. Principal Qr. at Rourkela.

6 Pwd staff qr at Ct campus

'l Saletax Deptt. staff Vs.Cf /7 to CTl 15 atUditnagar

2 Satetax Deptt. staff Qrs.CTl'18 to CTl13 atUditnagar

4 Labour deptt staff Qr.97-100 at Labourtenament, Rourketa.

4 R/R to Second officer quarter at Ghasipura. 2.00

Tota[ = 14.OO

S/R to.....Sundargarh 1 ADB Colony Qtr No . 1 to 9 at ADB Colony, ,

Sundargarh

2 Assistant Engineer Quarter at Rajgangpur

4.00

2.00

3 6 Nos. Aqricutture Staff Quarter atRajgangpur

4.50

4 DAO Quarter at Rajgangpur

5 ,Excise Superitendent Qtr at Rajgangpur

6 lGovt. Hospital Staff Quarter at Rajgangpur

7 S.P. Res'idence at Sundargarh

4.002.00

2.00

4.00

E:\C.8.(B)\SPR\2A18 i9\At\,1P 2018 19\A.L4.f^..2A18,19.24-O7.2018 CD\A tu|.F,Ees.C,ittcal.Res PB 5sls6

total =i 27.OO

Name of tne(R&B) D jvjsion

)t.No

f.. an: ci ih: tA/ci-ks U i-l;'. AmC! rtRequire'

,fiI

I(7) (3)

A. D.44. Residence at Udjtnagar.

Sub'Cottector Res udit Naqar

Revenue staff QrsNo'1 ,6,11,7,8 at Bonai"

Revenue staff Qrs Amatapara at Bonai

P.W.D. Staff Qrs at Bonai

(4\ (5)

3.00

2. 00

4 .00

7

8

9

10

11

3.00

2.50

2.5.17 E-Type Qrs at New LIC Cotony at Rourketa

13 E-Type Q5s at otd LIC Cotony at Rourkela

14 Mining Staff Qrs at Ud itnagar, Rou rketa.

7.s0

2. 50

15 3R/1 ,2RaPw-5 to 6 Type staff Qr. atUditnagar

2.00

16 Revenue staff ftat qr,uditnagar 2. 50

17 staff Qr. No2 to 5 at U.G.l.E., Rourketa. 2.50

71.5032.0

18 staff Qr. No 8 to 11 at U.G.l.E., Rourketa.

19 staff Qr. No E/5 to 80 at U.G.l.E.,Rourkela.

20 Pwd Qr Etype Qrs 4no Bonai.

2. s0

3.00

4.00

71 Medical Staff Qrs Bonai. 3.00

l^oo22 Revenue staff Qrs at Uditnagar, Rourkela,otd L.l.C Colony

23 D-Type Qrs at otd LIC Colony at Rourkela 2. s0

74 pwd staff Qrs.1 at potice cotony Uditnagar,RourkeIa.

2.00

25 pwd staff Q1s2,5,73,74,8,9 at poticecotony Uditnagar, Rourketa.

3.00

76 F Type Qrs at otd LIC Cotony at Rourketa 4.00

Total= 64.00S.R. to Govt. Resident.ial Buitding = '14

Grand Tota[=

t66o.4tt\\

Chief Engi neer Buitdings)

E:\C E.(B)\,SPE\2018 19\AMP 2o18 19\a itl ' 2o1a 19 24 C7 2A18-CD\A.M.P 'Res.Clacoj Res

Oc isha, Bhubaneswar

Pg_s6ls5

.N

aiiijaaL ;.i:,rai'ii.. i,rrr.a _g. i. rr.ri\sl

aIE -:i iia t(arrl..tRs. ln Lakhst

Amr! -t Recuir ad @j1i:J) !r\'lsririr

S/R to E.l. to different Residential Buitdinss

(1) t2) (l) 14)

1 Pun lSi R to E.l. tc.ir{Ie.ent qesidcnriat ELrjtdingl 7.542 Khurda S/R to E.l. to differcnt ResiCentiat Bur.ldinss 7.503 Nayagarh S/R to E.l. to different Residentiat Buitdings 2.504 Bhubaneswar No-l 5/R to E.l. to djfferent Resjdentiat Bujtdings 2.545 Bhubaneswar No-ll S/R to E.l. to different Residentia( 6uitdings 2.506 Bhubaneswar No ,ll S/R to E.l. to different Residentiat Buitdings 2.50

7 Bhubaneswar No-lV 5/R to E.l. to drfferent Residentiat Buitdings 2.508 Bhubaneswar No-V S/R to E.l. to different Residentjal Bujtdings 2.509 Cuttack I S/R to E.l. to different Residentiat Buildings 2.5010 Cuttack-ll 5/R to E.l. to djfferent Residentjat Bujldjngs 2.50

1l Kendrapara 5/R to E.l. to different Residential Buitdings 2.5017 Jagatsinghpur 5/R to E.l. to different ResrdentiaL Buitdings 2.5013 Panikoiti S/R to E.l. to different Residentiat Buildings 2.5014 DhenkanaL S/R to E-l- to different Residentiat Bujtdings 2.50

15 Angut S/R to E.l. to different Residentjat Buitdings 2.5016 Charbatia 5/R to E.l. to different Residentiat Buitdings 2.5017 Ganjam No-l S/R to E.l. to different ResidentiaL Buil.dings 2.5018 Ganjam No'll S/R to E,l. to different Residential Buitdings 2.5019 Bhanjanagar 5/R to E.l. to djfferent Residentiat Buitdings 2.5020 Phutbani S/R to E.l. to different Residential Buitdings 2.5021 Boudh 5/R to E.l. to different Residentiat Buitdings 2.5022 Batiguda 5/R to E.l. to different Residentral Buitdings 2.50

23 Koraput 5/R to E.l. to djfferent Residentiat Buitdings 2.5024 Jeypore 5/R to E-1. to different Residential Buildings 2.50

Nabarangapur S/R to E.l. to different Residentjat Buitdings 2.5026 Malkanagiri S/R to E.l. to different Residentiat Buitdings 2.5027 Rayagada-l 5/R to E.l. to different Residentiat Buitdings 2.5028 Rayagada-ll 5/R to E-1. to different Residential Buildings 2.5029 Paralakhemundi 5/R to E.l. to different Residential Buitdings 7.5030 Sambatpur-l S/R to E.l- to different Residentiat Buitdings 7.5031 Sambatpur-ll S/R to E.l. to different Residentiat Buitdings 2.5032 Deogarh S/R to E.l. to different Residentiat Buitdings 7.50

Jharsuguda 5/R to E.l. to different Residential Buitdings 2.50

34 Baragarh 5/R to E-1. to different Residentiat Buitdings 2.50

35 Botangir 5/R to E-1. to different Residentiat Buitdings 7.5036 Kantabanji S/R to E-1. to different Residential Buitdings 2.50

37 Sonepur S/R to E.l. to different ResidentiaL Buitdings 2. 50

38 Kalahandi S/R to E.l. to different Residentiat Buitdings 2.5039 Khariar S/R to E.l. to different Residential BuiLdinss 2.50

40 Batasore-l S/R to E- l. to different Residentiat Buildings 7.5041 Balasore-ll 5/R to E-1. to different Residentiat Buitdings 2.5042 Bhadrak 5/R to E.l. to different Residentiat Buitdings 2.504j Mayurbhanj 5/R to E.l. to different Residentiat Buitdings 2.5044 Rairangapur 5/R to E.l. to different Residentiat Buitdings 2.50

45 Keonjhar S/R to E.l. to different Residential Buildinps 2.5046 Ghatagaon 5/R to E.l. to different ResidentiaI Buitdings 2.5047 Sundargarh 5/R to E.l. to different Residential Buitdings 2.5048 Rourkela S/R to E.l- to different Residentiat Bujtdings

Total =

2.50

128.00

\Chief Engineer (B

Odisha, Bhubaneswar

E \C E fB)\SPRUo1&79l4MP 2018 191A M P 201&19-2q7-2018-CD\Cnhcal-E l./Res

I soo

PROPOSAL FOR WORK LIS-r CF CR.tTiCAL (RESIDENTTAL)

rCR THi \':AP.2:18-19 Ci C.p.H. (:.&B) DtvlSICti

Name of the(R&B ) Division

st.No.

Nar-ne of the v,,o rk AmounIrequired

1ir i iair rs7

0.50

G.P.H. No-l 1 5/R to Ph work of PWD staff Quarter No IVN-6, Unit 6 0.40Bhubaneswar

S/R to PH work (R&B) Staff qrs inside OMP lB cuttack of t.Z5Monorama Mohanty and Jagannath Padhi

3 S/R to PH work (R&B) staff qrs near cuttack lB OMp Sqr cuttackof K. C. Rout

4 5/R to PH

NimparaJE qrs and water supply 9 nos of PWD staff qrs at 0.60

2

5 M/R to PH work of PWD LDC

occupied by sanjay barik Batasore

qr Near (R&B) Division No.l 1.00

6 S/R to PH work of PWD staff Qrs No lR-6 expressway cotony Unit8 Bhubaneswar

0.40

7 S/R to PH work of Barrack No-10, Expressway cotony Unit-8Bhubaneswar

0.40

8 5/R to PH work of PWD staff qrs No 2R-4 and ZR-8 Unit-6Bhubaneswar

9 5/R to PH workof PWD staff Qrs No G 1/1 Unit-7 Bhubaneswar

10 M/R to PH work ofPartakhemundi )

D type doctors qrs (s.K,Mishra at

1.41

1 .41

1.42

11 S/R to P.H. Work of AEE (ReB) quarrer at Athaqarh 1.0017 S/R to P.H. Work of PWD Staff Qrs at Athagarh. 2.0013 S/R to P.H. Work of AE Section Officers quarter at Baramba 1.0014 5/R to P.H. Work of AE Section Officers quarter at Narasinghpur. 1.00

15 lmprovement of PH work to AEE Qtrs Sub-division at Udata 00

16 lmprovement of PH work to AEE Qtrs section at Udata 2.0017 lmprovement of PH work to (R&B) staff qtr at Karanjia occupied

by J.E Aswani kumar Mahanta .

1.00

18 lmprovement of PH work to 3 nos pWD staff qtr at Betgodia atBaripada.

1.00

19 lmprovement of PH work to PWD staff qtr occupied by KabitaManjari Prodahan(J.C) at Baripada .

20 M/R to P.H work of PWD staff qrs occupied by partha sarathiBehera at Baripada .

1.00

1.00

71 M/R to P.H work of PWD staff qtr occupied by Bikash pani ( A.E)at Bripada .

27 M/R to P.H work of PWD staff qtr( inside R&B Exe. Eng. Res nowoccuoied bv Amulva Mohakud at Bar-ipada .

23 M/R to P.H work of (R&B) Exe. Eng. Res( Suit-ltl ) at Baripada .

2.00

2.00

3.00

24 M/R to P.H work of 4 nos'E'type qtr at Gotapbag, Baripada. 4.00

Name ci rneL--4 3 ' T\j ;.-..\r!/9''.-'!

ll aite cf tne wori Aanountrrquiie

Z)

iln lakiil2.00

26

27

rv\ri. ro F.ii vvork of Z nos PVvD sraif qri inirolli oi :wagatia l\ivasat 3a rr pada

lmprovement of water supply connection system of 1st & 2nd

colony at Rairangpur.

lmprovement of PH work to (R&B) staff qtr occupied by PWD JE

Thakurmunda

Mi R to Pi work of RAB Jr Qrs.ii Buguda

M/R to PH work of R&B Staff Qrs.at Kabisuryanagar

M/R to PH work of R&B Staff Qrs.at Sorada

M/R to PH work of R&B Staff QIs.at Bhanjanagar

7.50

1.70

2.00

1.00

2.00

2.00

28.)o

30

ir.;.\L M/R to PH works of PWD Staff Qrs. at Kamapatti Berhampur

33 M/R to PH works of PWD Staff Qrs. at Bijipur Berhampur

34 Qr No-3R/7

35 Qr No--2R/8

36 Qr No-2R/13

't .00

1.50

1 .50't .50

37 Qr No-2R/4

38 Qr No-2R A/1

1.00

1 .00

39

40Qr No 2R/7

Qr No-2R A/441 Qr No-2R/6

1.00

1.bo

0.50

42 Qr No-2R/17 1 .50

4344

Qr No-3R/8

M/R to PH works of PWD Staff Qrs. At Digapahandi

M/R to PH works of PWD Staff Qrs. At Hinziti

'l .50

2.00

4540

1 .50

M/R to PH works of PWD Staff Qrs. At Chikiti47 MiR to PH works of R&B staff Qr. (Nevi colony) at

Paratakhemundi

7.00

7.60

48 S/R to PH work of PWD Quarter occupied by SDO of R&B

Subdivision, Jaleswar

't .50

49 S/R to PH work of PWD Staff Qtrs VR-1 at Unit-6, BBSR 1 .00

50 M/R to PH work of PwD Staff Qtrs. (C, D & E type) PWD Cotony

at Satyanagar, BBSR. (EPH Works)

3.00

51 M/R to PH work of PWD Staff Qtr. No.-F-1 to F-4, I)WD Cotony atSatyanagar, BBSR. (lPH Works)

52 M/R to PH work of PWD Staff Qtr, No.-B-1, P'/VD Cotony atSatyanagar, BBSR.

53 M/R to PH work of PWD Staff Qtr. No.-C1 & C2, PWD Cotony at 2.00Satyanagar, BBSR

2.00

3.00

54 M/R to PH work of (R&B) Staff Colony Qtr. No-E-2 & E-4 atSatyanagar, BBSR.

1 .00

Satyanagar, BBSR-

N; '': re of th..

l1-,;l.,iiv:s ,-;

Name of the work

t, i to P.H. Work of (R&B) staff Qr's of Sri Ajaya Kumar Pradhan

. ::-lrt-.r ) ri (t'18) !.tl-. DiYi:i.n C1n'nr l': Rlnki Clltt:ck

Jr. Cterk at Banki, Cuttack.

58 S/R to P.H. Work of (R&B) staff Qr's of Sri Pabitra Kumar Behera

at Banki, Cuttack.

SS Sln to p.ff. Work of (R&B) Staff Qrs Occupied by Er' Soma Das

inside SCB MCH, Cuttack.

n to F.H. work of (RAB) A.E.E. quarter at Pattamundai'

61 S/R to P.H. work ofRajnagar

1 no E type quarter of (R&B) staff at I .50

kg

0.90

0.90

0.90

0-90

1 .5060 sl

Amountre q uirecl(ln takhs)

62 S/R to P.H. work ofRaj nagar

2 no lR quarter of (R&B) staff at 1 .50

63 5/R to P.H. work of G.P.H. J. E Quarter at KendraPara. 1.50

1.5064 S /R to Ph work (R&B) 5.D.O. quarter at Jajpur

65 S/R to Ph work of (ReB) A.E.E quarter at Jajpur town 1.00

66 S/R to Ph work of GED A'E.E Quarter at Panikoiti 1 .50

Total= 94.19

G.P.H. No-ll 1 S/R to P.H work of qtr. No CB-7 at Jai[ Chowk Sambatpur. 0.50

2 S/R to P.H work of qtr. No 1R/20

Sambatpur.

at Trinatha CotonY O.49

3 S/R to P.H work of 2nd Judicial Magistrate Res at Sakhipada 0.50

Sambalpur.

4 S/R to P.H work of Jait D.G qtr at Jai[ Chowk at Sambalpur. 0.50

5 S/R to P.H work of qtr. No CB-12 at JaiI Chowk SambaIpur. 0.50

6 S/R to P.H work of Vigitance Judge Staff Toitet Chamber at 7.13

Sambatpur.

7 lmput, To P.H work of Additionat Toitet & Bathroom for Res. of 3.04

E.E (R&B) No-ll Sambatpur. (lnt. & Ext P-H work)

8 lmput. to P.H work to P.W-D qtr.Sambatpur. (Occupied by P. K Biswat)

No.M.M-5 at C,S CotonY 1.90

lmput. to P. H work

Sambatpur. (occupied bY

No-ll Sambatpur)

to P.W.D qtr. No.1R/21 at

R.P Sharma Chowkidar G.P.H Division

1.499

11

12

10 lmput. of P.H work to 2Nos G.PH Store Shed qtr (occupied bY 7.47

S.Niat & B.Mishra) at SambatPur.

S/R to P.H work of CB-11 near Jait Chowk Sambatpur' 7.47

S/R to P.H work of qtr No. 2RB-1 at Zitta Schoot CotonY at 0.50

Sambatpur.

13 Si R to P.H work of LRA/ 62, }RAl64 &.2RA/67 at L'l'C Colony

at Sambatpur.

3. 50

14 SIR to p.H work of 2RA/11 & 2RA/14 at L'l C Colony at 7.67

Sambatpur.

ry?',1

l.{ame oi ri-r€

iR&3; Dr,1::.:rI..iame oi ihe woi K Ailroi.rnt

(rn taki;s )

i 5 5i i to P_H workSr1[11n1;,

oi 2RA/43 & 2RAi51 at L. .C Coioni, ar l.>d

16 5/R to P.H work of S.E (R&B) peon Res. in Campu, of S.E Res atSarnbalpur.

17 S/R to P. H work of C.M Cottege Siaff qtr t.io. TH. t 2 atSambalpur.

18 S/R to P.H work of p.W.D Staff qtr. at Sambatpur .(occupied bySaroj Ku. Mrshra)

19 S/R to P.H work of P.W.D qtr. (Occupied by Zitta pirisad) ai 1.96Koraput.

0. 50

0.50

0.49

20

21

S/R to P.H work of Revenue Staff qtrs at Nabaranqlur.S/R to P.H work of P.W.D Staff qtrs No. j0,31 in I).W.D Cotony,Rayagada.

1.17

1.49

22 S/R to P.H work to Residence of E.E, S.D.O, p.W.D qtr no f,Z atCottectorate Road, Rayagada.

to P.H work of Res. of S.E (R&B) Circte at Jeyp3re.73 S/R

Dist. of

1.98

1.98

1 .34

4.00

z.1s

7.47

7.57

24 S/R to P.H work of Res. of SDJM patnagarh in theBotangir

25 R/R of P.H work of Revenue qtr No-SO-1 at C.S CotonySambatpur. (Occupied by Sri Bimatendu Roy Corrmissioner ofMunicipatty Sambatpur. )

26 R/R of P.H work ro qtr. No. 2R8.25 p.W.D Cotony Near TittaSchoot, Brooks Hitt at Sambatpur.

77

78 S/R to P

lmpt. to P.H work of P.W.D qtr No 3R/10 at Samb,rtpur.. H work of P. W. D Cotony A/ 1 at Sambatpur. (OccupieJ

by Steno)

79 S/R to P.H work of p

(Occupied by M. K Ray)

W.D qtr No. 2RA/3 at. Sambatpur. 1 .58

work of Vigitance S.p Res. at Brooks Hitt at 2.0830 S/R to P.H

Sambatpur.

11 lmput of P. H work to J.E GED qtr at Brooks Hitt Sambatpur 1.4832 Renovation of P.H work to qtr No. zRA/3 Occupied by Manorama 1 .09

Das at L.l.C Colony Sambatpur.

JJ Renovation & Renovation of p.H work to p.W.D qtr No. M.M_j atC.S Cotony Sambatpur. (Occupied by Ajit Ku. pradhan, Line ManG. E. D Section Office, Sambatpur.

1 .58

34 lmprovement of P.H work of p.W.D qtr. Noof {R&B) !,r Offlce, Sambatpur.

35

36

F-Panda, Head Cterk 1.29

0.97

0.89

S/R to P.H work of Staff qtr (R&B) S.E Batangir.Si R to P.H work of qtr. No. F/.t p.W D Cotony at Sarnbatpur.

); S, i:i iJ i.rr ritriir ..r i .r..A, -u i .;iA,-, "t L.r.,_ _._,,,,,,r .,Sambatpur.

38 Impt. of P.H work to p.W.D qtr. No 12 & 14 at L.l.C Cotony atSambalpur.

1 .58

Amoun irequired(ln takhs)

Name of the workst.No

ll.-'me of the(RL") Division

ka

39 Repair to P.H work to NH Asst Executive qtr at Brooks Hi[[ 0 99

!lmhalnrtr

40 lmpt. of P.H work to qtr- No 2RB/3 & ?RBl7 al Jai[ chowk

41 :;[?:'lT work to rahasitdar Res. at Patnasarh in the oist' or

BaIang'ir

iz stC G p.n work of Revenue Staff qtrs occupied by

CoUector Driver at Patnagarh in the district of Balangir'

43 S/R to i.H worX of CeO StXf qtr at 3Nos of Driver Cotony at 2.6-/

Sambatpur.

1 .50

1.90

Sub- 1.11

44 5/R to P.H work of qtr No. 3R D/2 C S Cotony at SambatPur.

45 S/R to P.H work toCotony RaYagada.

P.W.D Staff qtr No. 36,39'41 in P.W.D

46 lmput of P.H work toSambatpur.

qtr. No 2RB/25 at L.l-C Colony at 1.43

2RB-5 L.l.C CotonY near Stadium at 7.29

0.501-50

47 R/R of P.H work to qtr. No

SambatPur.

ut of P.H work of P.w.D qtr. No 1 R/ 3 at SambatPur 1.08lmp4849 R to P.H work of qtr No. 2/ 13 at R.P Line at Sambatpur.v 0.50

50 S/R to P.H work of qtrs No. TD-5/1 of VSSUT at Burta' 1.19

51 Renovation & lmProve ment of P.H work to 1 No AEE qtr & 1 No 7.57

of otd P.W.D 5.D.O qtr under (R&B) Sub-Division Office at

Patnagarh

52 Renovation & lmprovement of P.H wor

Potice Station at Kantabanji.

53 Renova tio" A f"tpi"re.ent of P.H work to 3nos E type qtr' 1 4.00

Nos of F type qtr & 2Nos of 4th Grade qtr under (R&B) Sub-

Division Office at Patnagarh

k to 2 Nos F tYPe qtr 1-92

54 S/R to P.H work of G.M Cottege qtr No. TH-3 at Budharaja 0.50

Sambatpur. (OccuPied bY R. NaYak)

55 5/R to P.H work of P.W.D Staff qtr at Sambatpur. (OccuPied by 0.49

D.Das)

56 S/R to P.H work of P.W.D Staff qtr at Sambatpur. (OccuPied bY 0.50

R.Maharana)

57 lmpt. to P.H workSundargarh.

of 4 Nos 2R Ftat qtr at Dengibhadi , 3-47

58 lmpt. to P.H

Sundargarh.

work of 4 Nos 2R P.W.D qtr at Dengibhadi, 2.79

59 lmpt to P-H work of 2 Nos 3R P.W.D

Sundargarh

60Sundargarh.

61 Renovation of F.H work in Dist. Judge qtr at Phutbani in the

Dist. Kandhamat.

.- 1,J ,.,_.r .' 1 Nc, 3fi, p.\\,.D q.;lillpl. LU i .i I \\ut r\ ur -

qtr at Btock CotonY, 7.01

ri Dcngibh"di, i.l4

7.55

dq Name of the(R&81 Divisioi

SL

i.ljName of the work Amount

reqUlrr--(ln taklis )

6Z

63

64

65

iarpi- to P.ii work ol 4 Nos 2R P.W.D qtr at Btock Cotony, SLndargarh

lrnDt. to P.H work of4 Nos qtr:r R H S falonr. s, ndi,oi,hJ.4 I

66

lmpt. to P. H work of 6 Nos 2R p.W. D qtr at Sundargarh.lmpt. to P.H work of 4 Nos 2R p.W.D near p.W.D l.B atSundargarh.

lmpt. to 4 Nos D type p.W.D qtr aL ADB Cotorry, Mehesidhi,Sundargarh.

lmpt. to P.H work of Revenue qtr. No 19 & 22 Near parabeda,Jeypore-

lmpt. to P.H work of Residentiat qtr of 2Nos a"i E*".rtir" i.S8Engineer (R&B) at Jeypore.

69 S/R to P.H work of p.W.D qtr Occupred Oy a:st. fiecutrveEngineer Kuchinda.

J.J 1

) 1-)

2.50

1.5467

bat

7.79

70 Renovation of P.H work to p.W.D qtrEnqineer, Kuchinda.

Occupiecl by Assistant 3.00

71 lmpt. to P.H work of 3Nos P,W.D Staff qtr near iR&B) Division 2.48Office, Jeypore.

72 R/R of P.H work to Res. of CiviI Judge & Senior Division-Cum- 3.00

5/R to P.H work of qtr No. 2RA-19 Agricutture Cotony ii Samlijtpui

Asst. Session Judge at Rairakhot.

0.55/R to P.H work of p.W.D Staff qtr B/13 (Gautam ;inooj Aro&s 1 .10

Hilt Sambatpur. at Samba[pur

74S

75S /R ro P.H work of p.w.D Staff qtr 2RB_18 at Sam:atpur 0.55

0576 S/R to P.H work of p.W.D Engineer,s qtr backsid- .1 n type qir. atSambatpur.

qtr No. 2RB-'t9 L.t.C colony at Samb.Lpur1 .1077 5/R to P.H work of p_W.D Staff

78 5/R to P.H work of qtr No. 13/7 (Occupied by ,3opat Ranjan 0.55Pati) at C.S Cotony, Sambalpur

79 5/R to P-H work to Res. of Executive Engineer (R& B) Djvision ,leypore 1.4980 S/R to l . H work of 4 Nos (R&B) Staff qtrs at Angul 1 .5581 S/R to P.H work of P.W.D qtr No. M.M-2 Occrrpied by Sri- 1 .34

Dotogobinda Swain at C.S Cotony, Sambatpur.82rmpt. to P.H work to P.W.D qtr No 75 & 76 at p.V1/.D

Sambatpur.Cotony at 2.47

83 lmpt. to P. H work toJudge qtr at Sambatpur.

qtr No 2RA-42 L. l. C Cotorry Sambatpur 2.74

Total = 145.81

Grand Total = 240.oo

\ \(-\

Chief Engrrreer (Buildinqs)Odisha, Bhubaneswar

E:\c.E.(B)\SPR\2018-19\aMP 2018 19\A.M.P.-2018-19-O1-1G2018\A.M.P.-Res./19th Plon-Res PE_1129

STATEMENT

Transferred From Plan Scheme-Residential Buildings @

(Rs. in Lakhs)

Name of the(R&B) Division

SI

No.

Name of the Works Unit / Area Amou ntRequired

(1) (2) (3) (4) (s)

S/R to.....Puri 1 Renovation of F type Quarter in RHS Cotony

Btock No 1

2.00

2 Renovation of F type Quarter in RHS ColonyBtock No 2

2.00

3 Renovation of F type Quarter in RHS CotonyBlock No 3

7.00

4 Renovation of F type Quarter in RHS CotonyBlock No 4

2.00

.5 Renovation of F type Quarter in RHS CotonyBtock No 5

2.00

6 ]Renovation of F type Quarter in RHS Cotony BtockNo6

1.00

7 Renovation of F type Quarter in RHS CotonyBlock No 7

2 00

Total= 13.00S/R to.....

I

Khurda 1 Revenue Staff Quarter at L.l.C. Cotony Khordha 1.00

2 Coltectorate office Staff Quarter at Khordha 1.00

3 Executive Engineer (R&B) Residence Khordha 2.004 (R&B) Division Office Staff quarters at Khordha 1.00

Total=' 5.00S/R to.....

Nayagarh 1 Revenue Qtr No.10 0.50

2 Revenue Qtr No.19 0.50

3 Veterinary Asst.Surgen Qtr at Ranpur. 1 00

4 Teachers Staff Qtr (8 nos) at Khandapada. 1 00

5 Auditors Staff Qtr at Khandapada. 0. s0

6 E type Qtr Twin Block No.l Qtr No. 1 atNayagarh.

0.50

7 F type Qtr Twin Btock No.l Qtr No.1 atNayagarh.

8 Veterinary Staff Qtr(2 nos) at Daspalla.

0.50

0.50

Total = 5.00

Name of lheR&B) Division

si.Nc

Name of the Vy'orks Unit / Area Am ou ntRequired

(4)(2\(1) (3) (5)

BBSR No.l

SiR to.....1 S/R to Qr. No. 4R - 3/1 and 3/22 S/R to Qr. No. ll - 13/1 to 13/63 s/r TO Qr No IVR-2/2

4 S/R to Qr. No. IVB - 6/a5 S/R to Qr. No. ll - 13/4

U nit-lllUnit-lllUnit- ll

Unit-lllunii-riU nit-ilUnit-llunitlil

0. s00

0.500

0. s00

o.5oo

0.300

0.300

0.5-o

6 S/R to Qr. No. ll RPF - 9/37 S/R to Qr. No. ll - 1714

8 S/R to Qr. no. Vll-D/S-2l2 0.4509 5/R to Qr. No. G-67, 68 Unit- lll 0.35010 S/R to Qr. No. ll - 29/5 U nit- lll 0.40011 S/R to Qr. No. G - 62 Unit- lll

Unitl llUnit-lll

0.300

0.30017 5/R to Qr. No. 2RB - 24'13 S/R to Qr. No. IVB - 47 /3 0.50014 S/R to Qr No IVB-16/3 Unit-lll 0.500

Unit-ll 0.25015 S/R to Qr No ll-5/l16 S/R to Qr No 2RA-2 Unit-ll 0.25017 S/R to Qr No ll-9l4 Unit-lll

Unitri0.500

18 s/r TO Qr No V-2 0.50019 S/R to Q.r No 3RS/S-8 BJB Area 0.50020 S/R to LT Bl.ock O No ll-16i 1 to 16/6 Unit-lll 0.50021 S/R to O No Vll D/S-3 Unit-lll 0.50022 SlR to Qr. No. 1R-9 at PWD colony PWD Cotony

Satyanagar i

0.500

23 S/R to Qr. No. IVB - 13/4 Unit-lll 0.50024 S/R to Qr No IVR-30/1 ._ Unit-ll . 0.450

Unit-ll 0.45025 Si R to Qr. No. ll - 10/326 S/R to Qr. No. ll-1l3 Unit-ll 0.30027 SIR toQr. No. IVA-24/4 Unit-ll 0.30028 S/R to Qr. No. 1R - 22 PWD staff Qtr PWD Cotony

Satyanagar0.300

29 S/R to Qr. No. 1R - 9 PWD staff Qtr PWD ColonySatyanagar

0.500

30 S/R to Qr No YIB-2/2 Unit-lll 0.40031 S/R to Qr No VR-9/2 Unit-lll 0.40032.-JJ

S/R to Qr. No. IVA-45/5 Unit-ll 0.250S/R to Qr. No. D - 36 BJB Area 0.500

34 S/R to Qr No IVA-37/39/1 Unit-ll 0. s00

o. soo

o.+oo

35 S/R to Qr No VA-7l4

36 S/R to Qr No IVA-'/5Unit-llUnit-ll

37 S/R to Qr. No. IVB - 18/1 Unit-lll 0.40038 S/R to Qr. No. IYB - 13/2 0.400Unit-lll

E:\C.E.(B)\sPR\2018 1g\AMP 2o18-L9\a.M.P.-2018 19 0L-1G2018\A.M.P.-Res./7Oth Pton Res Pg_2/29

E:\C.E.(B)\SPR\2018-19\AMP 2O18-19V.M.P.-2018-19-01-1G2O18\A.M-p.-Res./1oth plon-Res PC_3/29

Name of the(R&B) Division

st.No.

Name of the Works Unit / Area AmountRequired b

us(1) (2) (3) (4) (s)

39

40

41

42

s/r TO Q-r No 1R-12

5/R to Qr No 1R-S/S-10

5/R t; Qr No D-16

BJB Area

xatpina area0.500

0.500

Katpana Area 0.500

S/R to Qr. No. VA - 2Bl3 Unit-ll 0.500

43 S/R to Qr. No. YA - 17-19/3 Unit-llU nit- lll

0.400

44 SlR to Qr. No. IVB - 31/3 0.500

45

46

S/R to Qr. No. ll -11l3 Unit-lll 0.400

S/R to Qr. No. ll -'1816 Unit-lll 0.350

47 SlR top Qr No IVB-50/3 Unit-lll 0.500

48 5/R to Qr No IYB-22/2 Unit-lll 0.500

49 S/R to Qr No IVB-11 l4 U nit- lll 0.400

0J0050 S/R to Qr. No. IVB - 4014 Unit-lll51 S/R to Qr No IYB-1814 Unit-lll 0.400

oJo052 5/R to Qr. No. VA - 2014 Unit-ll53 S/R to Qr No 2RB-3 Unit-lll 0.500

54 S/R to Qr No ll-1411 and 18/1 Unit-lll 0.500

oJ0055 s/r TO Qr No IVB-48/3 Unit-lllUnit- lll 0.500

0.500, 57 iS/R to Qr. No. ll - 2516 Unit-llli 58 'S/R to Qr. No. IVB - 3412 Unit-lll 0.500

59 s/r TO Qr No IVB-34/3 Unit-lll 0.3 50

60 5/R to Qr. No. IVB -33/4 Unit-lll 0.400

61 5/R to Qr. No. IVB - 2811 Unit-lll 0.400 -, 0.45062 S/R to Qr No IVR-27/1 Unit-ll

63 S/R to O. No. lV-A 38/2 Unit-ll 0.400- 0.450i64 S/R to Qr. No. IVB - 2/4 Unit-lll

65 S/R to Qr. No. IVB - 23l1 Unit-lll 0.400

66 S/R to Qr. No. IVB - 3611 Unit-lll 0.500

68

70

69

S/R to Qr. No. IVB - 9/400

0

r Unit-lll67 S/R to Qr. No. IVB - 36/2 0

0

5

0.400

S/R to Qr. No. 2RA - 47

S/R to Qr. No. ll - 18/5Unit-llUnit-lll

i unit-ttt 500

500

Unit-lll

Unit-llUnit-ll

0.500

,. 75 S/R to Qr No VA-2i 1

S/R to Qr. No. ll - 1413

74 S/R to Qr No VA-1713

S/R to Qr. No. IVB - 21l371

73 Si R TO Qr No lR-1 in PWD lB Campus

72

80 'SlR to Qr No 4R-4l2

78 S/R to Qr No B-2

79 S/R to Qr No 2RA-48 and 2RA-28

Unit-ll

Unit-lll0.200

0.500

0.500

0.500

0.250

0.500

Unit-llUnit-lll

76

77

Unit- ll

Unit-ll0.500

0.400

S/R to Qr No VA-35/2

S/R to Qr No IVR-17/2 \-./'

Satyanagar 0.400

56 S/R to Qr. No. 2RB- l 1 and 12

Name of the(R&B ) Division

5t.

No

i.iame of tne Works

(3)

tvB-37/2tvB - 28/48-3

Y|-D/S-7/2tvR-27 / 4

2RA-1 /9

ot

87

83

84

SrR

S/R

S/R

S/R

S/R

S/R

85

86

toQr .

to Qr.to Qr.to Qr.to Qr.to Qr.

I'lo.

No.

No,

No.

No.

No.

87 S/R to Qr. No. F -5

88 S/R to Qr. No. F -6

89 S/R toQr No ll-241690 S/R to Qr No IVB-2014

91 S/R to Qr. No. IVB - 45/492 S/R to Qr. No. IVB - 30/193 S/R to Qr No IYR-611 ll-7 l4 and il-10/694 S/R to Qr No IIRPF-7/1

95 S/R to Qr No ll-3/296 5/R to Qr No llR-2/897 SIR to Qr No IYA-22/1

98 S/R to Qr No IYA-14/699 S/R to Qr No lV-16/5

(1) (7)

Unii / Area AmountRequired

(s)

Museum Area 0.500

Unit- lll 0.350Unit-lll 0.500Unit-lll 0

(4)

U n it-illU n it- lllUnit- ll

U nit- ll

Unit-llKatpana Ftat

tuluseum Aiea

0.500

0.500

0.500

0.500

0.400

0.500

0.so-

0.500

0.450

s00

Unit- lll 0.500Unit-llUnit-ll

Unit-llunitll

0.500

0.s00Unit-llUnitl It

0.500

0.400

0.400

Unit-ll0.400

0.400Unit-ll

Unit-llUritill

Unit-lllUnit-ll 0.400Unit-ll 0.s00

0.300

o. soo

Unit-ll 0.450Unit-lll 0.500Unit-lll 0.s00

100 S/R to Qr No IVR-4/2

101 S/R to Qr. No. G - 83, 75 and 5102 S/R to I nglRal103 S/R to Qr No IYR-17/2 r./104 S/R top Qr No lY-6/1 and 14/1'105 s/r TO Qr No ll-28/2106 S/R to Qr No llR-1/6107 SlR to Qr No IVB-14/2108 S/R to Qr No IYB-29/2

109 5/R to Qr No IVA-I8/1110 S/R to Qr No VllR-2

Unit-ll 0.500Unit-lll 0.500

111 S/r to Qr. No. IVB - 2/2112 S/R to Qr. No. IVB - 47/2113 S/R to Qr No -2913

114 S/R to Qr No 5RF-13

115 S/R to Qr No ll-8i 2

116 S/R to Qr. No.2RB - 10

117 SIR to Qr. No. IVB - 9/31 18 S/ R to Qr No lY A-30/ 32/ 4119 5/R to Qr . No. IVB - 51/4120 S/R to Qr No llR-2/2

Et\C.E.(B)\SPR\2018 19\AMP 2018-19\A.M.P. 2018-19 01.10-2O18\A.M.p..Res /7oth pton-Res

Unit- ll

Pg_a/29

Unit-lllunlt-ttrUnit-llUnit-lllUnit-ll I

0.500

0.400

0.400

0.400

0.400

0.500Unit- lllU nit- lll

Unit-llunit-itl 0.300

0.300

0.500

0.500

E:\C.E.(B)\SPR\2o18-1g\AMP 2O1*19\A.M.P. 2018-1s-01-10-2018\A.M.p. Res./7oth plon-Res PC_s/29

I\dII IC UI LIIC

(R&B) Division)(.No.

i\ame oT fne vYorKS unlt / Area Amou ntRequired e(2) (3) (4) (5)

Katpana Area 0.500

(1)

171 SIR to Qr No llR-.1 /4122 SIR top D type Btock Qr No D-43 to D-48

123 S/R to Qr. No. IVB - 37 11

U nit- Il

BJB Area

Unit-lllUnit-ll

0

0

0

300

.500

.500124 S/R to Qr. no.lVA - 2912 0.400125 S/R to O. no.lvA - 1216 Unit-ll

Unit-ll0.500

0.450176 5/R to Qr. no.lVA - 2l /6127 SlR to Qr. no.lVA - 33/1 Unit-ll 0.400128 S/R to Qr. no.VA - 16i 1 Unit-ll 0.500

0.300129 S/R to Q,r. no.lVA - 41-43/6 Unit-ll130 S/R to Qr. no.lVA - 2-416 Unit-ll 0.500'131 S/R to Qr. no.lVA - 1/2 Unit-ll 0.400132 S/R to Qr. no.lVA - 1/2 Unit-ll 0.400133 S/R to Qr. no.VA - 2013 Unit-ll 0.300134 S/R to Qr. No. IVA - 37-39/2 Unit-ll 0.300135 5/R to Qr. No. IVA - 9/2 9$lt .

Unit-ll :

0.500136 5/R to Qr. No. IVA - 2213 0.500137 S/R rto Qr No IVR-I5/2 Unit- ll 0.3 50

138 S/R Q5. No.lVA-26/28/6 Unit- ll 0.500

oJ0o139 S/R Qr. No.lVR-28/2 Unit-ll140 ;S/R Qr. No.VA-23/l Unit-ll

u;iLl0.500

141 Si R Q.r. No.ll-1413 0.500142 Unit-ll 0.3 50

141 rS/R Qr. No.llRA-16 Unit-ll 0.350,144 f lR to Qrs No 2RA(F) 2/3 Kalpana Area 0.350

145 tS/r to Qrs No2RA (F) 3/5 Katpana Area 0.350

146,5/r to Q5s NO2RA (F) 2/6 Katpana Area 0.400

i 147 iS/t to Qrs NO Dtype (T/S) Btock D 90 BJB Area 0.500148 S/r to Qrs NO E 1/6 BJB Area 0.500149 S/r to Qrs NO D-92 to D-93 BJB Area 0.500150 S/r to Qss NO2RB -2l3

151 5/r to Qrs NO E.5/1 BJB Area 0.400152 Slr to Qrs NO2RA F 7/5 Museum Area 0.250

153 S/r to Qrs NO D 38 BJB Area ; 0.500154 S/r to Qrs NOI RA S/S-15 Museum Area 0.500

155 S/r to Qrs NO2RA -5i2 Kalpana Area 0.500156 S/r to Qrs NO2RA F 6/6 Museum Area 0.500

157 ',5/ t to Qrs NO2RA -9i 1'1 Katpana Area 0.500

5/R Qr. No.ll-7l1

(7) (3) (5)(1)

' I'lame of the(R&B) Division

5i.

No.

I'1ame of the Works

158 5rr ro Qrs NO2RA F -2l2

159 S/r to Qr No B 6160 5i R to Qtr. No.VlllMR-3

161 S/R to Qtr. No-zRA-ll

162 SIR to Qtr. No.1R-8

163 S/R to civil defence organisation in Qtr No.A-

5

164 S/R to Qr. No.lVB-43/1

165 S/R to A.C. sheet shed No.7'166 S/R to Qr. No. type-ll-21 /2167 S/R to Qr. No. 5RF-1

168 S/R to Qr. No.S-6 of lB Premises

169 S/R to LT Qr. No.ll-23l5170 S/R to LT Qr. No.G-19 & 31

171 S/R to Qr. No.ll-7l3172 S/R to Qr. No.lVB-44l4

173 S/R to LT Qr. No.ll-1211

174 S/R to Qr. No.lVB- 10/3

175 5/R to LT Qr. No.ll-16/3176 S/R to Qr. No.lVB-35/1

1n SlR to LTQr. No.ll-20l3

Unit i Area AniountRequired

(4)

Museum Area 0.500

BJB Area

Unit-VUnit-VUnit-VUnit-V 0.500

Unit-lll 0.500

Satyanagar 0.500

Unit-lll

0.400

0.500

0.s00o. ioo

0.350

0J00Unit-lllSatyanagar 0.500

Unit-lllUnit-ltl

0.500

0.500

Unit-lll 0.400

Unit-lll 0.500

Unit-lll 0.500

iJooUnit-lllUnit-lllUnit-lll

0.500

0.500

Unit-lll 0.500

178 S/R to LT Qr. No.G-71 Unit-lll 0.450r 179 S/R to LT Qr. No. 2RB-8 Unit-lll

Unit-lllUnit-lll

0.500

0.450

0.450

180 S/R to LT U. No.ll-2611

i 181 S/R to Qr. No.lVB-40/'l

182 S/R to Q.. No.ll-22l4 Unit-lllUnit-ll

0.500

0.500I 183 S/R to Qr. No. VA-14/3

184 S/R to Qr. No. D-35 BJB Area 0.500

, 185 S/R to Qr. No. E-6l2I 186 S/R to Qr. No. F-7l2

' 187 S/R to Qr. No. ll R-3/9

188 5i R to Qr. No. IYA-17 /19/689 S/R to Qr. No. D-82

190 Si R to Qr. No. D-43

191 Si R to Qr. No. 2RA-7/9

'193 S/R to Qr. No. IYA-46/1

-1elll1"q.!9 lvA-1943195 S/R to Qr. No. IVA-3i 5

BJB Area 0.500

Museum Area 0.500

Unit-ll l

Unit-ll0.500

0.500

1 BJB Area

BJB Area

0.500

oJo0

192 S/R to Qr. No. YA-2412, VA-24/3, & IVA-18/4 Unit-ll

Katpana Area 0.500

0.500

Unit-ll 0.500

Unit-llUnit-ll

0.500

0.500

E.\C.E.(B)\SqR\2018-19\AMP 2A18 19\A M.P. 2018 19 01 1G20t 8\a.M.P.-Res./11th Plon-Re, Ps_6/29

(4)(2) I

(3)

Name oT tne(R&B) Division

5t.

No.

Name oT tne vYorKs unt[ / AreaRe

_ (1) (5,

0.500

0.500196 SiR

197 stR198 S/R

199 S/R

200 s/R

201 S/R

202 SlR

203 s/nzu ira

to Qr.to Qr.to Qr.to Qr.to Qr.

!9 ar.tg gr.

!o Q.to Qr.

vA-19/3

tvR-30/2

vA-8tzvA-413

2RA-37

vA-22/42RA-5YA-27/2

tYRnuz

No.

No.

No.

No.

No.

No.

No.

No.

No.

U nit- ll

Unit- ll

Unit- ll

Unit-llUnit-ll

500

500

500

0

0

0

0

0

0

Unit-llUnit-li

500

so0

205 S/R to Qr. No. VA-74/1

Unit-llUniilitUnit-llunit-tr

0.500o.5oo

500

0.500Unit-ll 0.s00Unit-ll 0.s00

206 5/R to Qr. No. IYA-42/2

207 SlR to O. No. YA-2914

208 5/R to Qr. No. IIRPF-5/4

209 S/R to Qr. No. 2RA-211

210 Si R to O. No. IIRPF-8/2

Kalpana Area 0.500

211 SlI t9 arr \o. IVA-31/3

212 SlR to Qr. No. IYA-4614

Unit-llUnri-il

0.s000.500oJ0oUnit- ll

213 S/R to Qr. No. IYA-4216 Unit-ll 0.500o50o214 SlR to Qr. No. IYA-3517 Unit-ll

215 S/R to Qr. No. ll-15/6 Unit-ll 0.500

t216 5/R to Qr. No. 2RA-3 & lV-6/2 Unit-ll 0.500

217 SlR to Qr. No. llR PF-9l2 Unit-ll 0. s00

218 5/R to Qr. No. IV-1/2

219 SIR to Qr. No. 3RF-512

Unit-ll 0.500

Kalpana Area, 0.500

220 S/R to Qr. No. IVR-23/2

271 ,5/R to Qr. No. 2RA-2110 and 4111

722 ,SlR to Qr. No. D-9

223 iS/R to state Museum Buiding , BBSR such as

lfixing of fatse cetting in conference hatl 1st

lfloor

224 5/R to Qr. No. IVR-14/2

Unit-ll 0.500

Katpana Area 0.500

Katpana Area 0.500

Museum Area 0.500

Unit-ll 0.500

225 5/R to Qr. No. lVB.21 /2 Unit-ll- Unr't-ll

0.500

226 SlRto Qr. No. IVR-10/4 0.500

t72=7_ ,sltto a1. No.1vA-29/4728 SIR to Qr. No. IVA-47 l1

Unit-ll 0.500Unit-ll 0.500

229 S/R to Qr. No. Type-ll-25/5

230 5/R to Qr. No. IYA-7 15

Unit-lllKharveIa

Nagar

0.500

Unit-ll 0.400

231 S/R to Qr. No. IYA-2412

232 SlR to Qr. No. YA-3412

Unit-ll 0. s00

0.500

E:\C.8.(B)\SpR\2O1&19\aMP 2O18-19\A.M.P.-2018 1901-1G2O18\a.M.P.-Res./1oth Plon-Res

Unit-llPg_7 /29

I

;3COrdro-

(5)

Si,

No

to Qr.

to Qr.

to Qr.

to Qr.to Qr.to Qr.,s QI:

!9qto Qr.

240

241 S/R

No.

No.

l.iame of the Vv'orks

(3)

vA-24/1tvA-10/ 5

vt D/s-1 /2wA-45/1

tvR-24/22RA-32

vt-D/s-4/2tvA-iu 1

wa-ij j'rs r +

rinit / Area Amou n tRequired

233

235

236

737

238

739

S/R

S/R

S/R

S/R

S/R

S/R

S/R

S/R

No.

No.

No.

No.

No.

No.

No.

(4)

Unit-llUnit-llUnit-llUnit-llUnit- ll

Unit-llUnit-llUnit-liUnit-li

0.500

0.500

0.500

0.500

0. s00

o. soo

oioo0.500

o. soo

0.500

0.500-242 SlR to Qr. No.-2RB-20

243 SIR to O. No. 2RB-S/5-3

244 SIR to Qr. No. 2RA-F-5i 1

Unit-lll,\4useum Area

Katpana Area 0.500

245 SlR to Qr. No. YA-8/1to8/4 Un'it-ll246 SlR to Qr. No. llR Pf-Ait o AtO Unit-il

0.500

oJoo

't .000

0.500

0.500

1.OOO

1.000

247 SIR to F type (T/S) Btock Qr. No. F-4l1 to 4/6 Museum Area 1.000

248 S/R to Qr.249 S/R to Qr.

No. ll-7/1to7l6No Vll D/S-2l'l

Unit- ll

Unit-lllnit-tt250 S/RtoO. No. lV-'l/2

251 5i R to O. No. D-7 Katpana Area252 S/R to Qr. No. IVA-14/5 Unit-ll

U"r't-ll 1.000253 Si R to Qr. No. IVA-4412

254 SlR to Qr. No. YA-25/1 Unit-ll 1.000255 S/R to Qr. No. IVA-33/6 Unit-ll 0.500

]52i!

256 S/R to O. No. IYA-14/5 Unit-ll 0.500257 S/R to Qr. No. IVA-13/15i 5 Unit-ll 0.600258 S/R to Qr. No. IVA-47/2 Unit-ll 0.500

R to Qtr. No. IVR-19/1 Unit-ll 0.500260 S/R to Qrs. No.llR (PF)-6/4 Unit-ll 0.450

o.l5o261 ,S/R to Qrs. No.ll-2l1 Unit-ll262 SIR to Qrs. No.llR (PF)-6/6 Unit-ll 0.450263,5/R to Qrs. No.ll-15/1 Unit-ll 0.s00

Total= 124.450

BBSR No.ll

E:\c.E.(B)\SPR\2018 19\AMP 2o1a 19\a.M.P.-2018 19-01 10.2018\A.M.p.-Res./1oth pton Res

Unit-1

Unit- 1

Pg_8/29

S/R to.....1

2

3

vilc-3viltR-i

Unit- 1

Unit- 1

0.764

1.893vilc-2 & vil-3

4 Yt\-lt75 5R-15 & VilC-t6 VtC-6t2

7 YIC-7

Unit- 1

Unit-1

unit-1

0.493

o.zsr0.421

0.3'13

0.413

(2)

7

E:\C.E.(B)\SPR\2o18-19VMP 2018-19\A.M.P. 2018-19.01-1G2018\A.M.P.-Res./7oth Plon Res Pg_9129

t\dl I lg ut Lr lg )t r\dt lle ut Lt]e vvotKs UIIIL / AT CA AmountRequired(R&B) Division No.

[-a(1) (2) (3) (4) (s)

39

8 VtC-4/1 , VtC-13/2,Vil-9 E VilR-1

9 VtA-3/7

1o 5R-8

Unit-1

Unit-1

Unit-1

0.774

1.0020.473

11 YR-z/1

vR-1 /7Unit-1 0.600

0.3 88

0.440

3.250

o.b7

17

13

Unit-'lvR-3/1 Unit-1

14 VR(P)-1 Unit- 1

Unit-'115 |-3/216 il-15t2 Unit- 1 0.29717 lR-3t7 Unit- 1 0.40218 ilR-2/1 Unit-'1 0.34719 |-22t7 Unit- 1 0.297

0.39620 il-3/8 Unit-1

71 |-5/1 r Unit- l 0.s0022 |-1/6 Unit-1 0.29723 tYB-2/2 Unit- 1 2.50024 w-39/2 Unit- 1 1.12025 tVR-1/1 Unit- 1 2.74776 tY-32t3 Unit- 1 0.50027 viltMR-5 Unit-6 4.906

: 28 lV-47/3 Unit-1 0.500

Unit-6 0.99529 IV|MR-3

30 vR-44 Unit-6 o.59731 2R-127 Unit-6 0.35032 VR-80 Unit-6 0.59833 D -6 Unit-6 0.59334 VR-11 Unit-6 0.59535 D-12 Unit-6 0.46836 VR.14 Unit-6 o.9u37 iVR-92 Unit-6 0.26038 VR.45 Unit-6 0.480

D-35 Unit-6 0.60040 VR-73 Unit-6 0.63341 iVR-z Unit-6 o.90742 D-15 Unit-6 0.418

I 43 tVR-11 Unit-6 0.551

44,tVR-53 Unit-6 0.40045 tVR-295 Unit-6 0.64246 tVR-253 Unit-6 0.400

1J5o47 lvR-83 Unit-648 IVR-59 i unit-6 0.35049 VR-1, P.W.D. Cotony I Unit-6 1.000

,..l"lame of the(R&B) Division

BBSR No.lll

st.

No

Name of the Vvorks

t

50 lVl'l-6, P.W.D. Cotony

S/R to.....t Qtr. No E-32l4

2 Qtr. No E-3/6

3 Qtr. No E-29l5

4 Qtr. No E-29l3

5 Qtr. No E-28l2

6 Qtr. No E-8/4

7 Qtr. No E-25l2

8 Qtr. No E-26l2

9 Qtr. No E-43l1

(7) (3)(1)

10 Qtr. No E-l83

11 lQtr. No E-181

12 Qtr. No B-3

13 lQtr. No B-16

14 Qtr. No B-13't5 Qtr. No B-1

t-]nit / Area AmountRequired

(4)

Unit-7Tota[=

0.491

40.00

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

(5) .

RentalCotony

RentaI

Cotony

neniitCotony

RentatCoIony

RentaICotony

RentaICotony

RentatColony

Rentat

Cotony

RentalCotony

IRC Vittage 0.40IRC Viltage 0.40IRC Vittage 1.50

IRC Vittage 1.50

IRC Vittage 1.50

IRC Vittage 1.50'16 Qtr. No F-48l284'17 Qtr. No E-53

IRC ViLtage 0.30

IRC Vittage 0.30

18 Qtr. No E-158

19 Qtr. No E-55

70 Qtr. No A/4IRC Vitlage 0.40VlP, Renta[ 1.25

2 iQtr. No atz72 Qtr. No 4/1623 Qtr. No A/1024 Qtr. No 2RB-2/8

25 Qtr. No E-89

26 Qtr. No E-58

27 Qtr. No E-47l5

28 Qtr. No E-321

29 Qtr. No E-104

E:\c. E. (B)\sPR\2018- 19\AMP 2018- 19\A. M.P.-2018- 19-01- 10-2018\a. M.P.- Res./1oth Plon-Res

UNIT-VIII

Ps_7o/29

I VlP, Rental 2.00

YrP,!g!tr!VlP, Rental

2.00

2.00

UNIT.VIII 0.40

uNtT-vil 0.40uNtT-vil o.4a

llental colony 0J0

UNIT-VIII 0.40

0.35

IRC Vittage 0.40

E:\C.E.(B)\SPR\2018-19\aMP 2o7a-19\A.M.P.-2o18-19-01-10-2018\A.M.P.-Res./1mh Plon-Res Ps_t!/29

t\crl I lg !rl LllE )(. t\d tg ul Ltle YYU, K5 utltL / At cd AtIl(]UnL

Required e(R&B) Division No.

(7) (3) (4) (s)(1)

30 Qtr. No D-l2 JayadevVihar

RentaI colony

0.60

31 Qtr. No D-11ll 0.60

32 Qtr. No T-B/3 Rental cotony 0.30

33 Qtr. No E-35/3 Renta[ cotony 0.50

34 Qtr. No G-69 UNIT-VIII 0.3535 Qtr. No G-67 UNIT-VIII 0.3536 Qtr. No FR-7214 C.S.Pur

C.S. Pur

0.3537 Qtr. No FR-25/7 0.35

o4038 Qtr. No FR 67 t739 lQtr. No F-96 0.35

oJsa0 ,Qtr. No F-93 UNIT.VIII

r 41 lQtr No F-89 UNIT-VIII 0.350.35.-42 Qtr. No F-72

43 Qtr. No F-6 UNIT-VIII 0.3544 rQtr. No D-1 1/5 UNIT.VIII 0.50

r 45 lQtr. No D-10/6 UNIT-VIII 0.50r 0.5046 lQtr. No C-70 uNtT-vilt

UNIT-VIII 0.35- 0J548 Qtr. No 2RA-5 UNIT-VIII

49 Qtr. No 2RA-49t3 uNtT-vill 0.4050 Qtr. No 2R -47/1 UNIT-VIII 0.40s1 l Qtr. No 2R -4517 i utttt-vttt 0.452 Qtr. No 2RA-4214 UNIT-VIII 0.40

L

53 Qtr. No 2RA-4213 UNIT-VIII 0.4054 Qtr. No 2RA-35/1 UNIT-VIII 0.4055 Qtr. No 2R -4/2 uNtT-vilr 0.4056 ietr. No E-8/1 UNIT-VIII 0.3s57 Qtr. No E-50 UNIT-VIII 0.4058

0.40

UNIT-VIII

UNIT-VIII

62 Qtr. No F-171

67 rQtr. No 2RA-17 13

i59 Qtr. No

UNIT-VIII

UNIT-VIII

UNIT.VIII

E-290

E-255

UNIT-VIII

0.40Qtr. No

0.40

0.35

0.30

0.30

64 Qtr. No 2RA-34/3

63 Qtr. No E-102

60 lQtr. No E-220

61 iQtr. No E-129

65 rQtr. No 2RA-2.1 /666 Qtr. No 2RA-34/4

UNIT-VIII 0.40UNIT.VIII

UNIT-VIII

i UNIT-VIII

0.40

0.30

0.30

I C.S.Pur

] UNIT-VIII

UNIT-VIII

47 tQtr.No 2RA-5/8

,' Name ot the(R&B) Division

5r.

No

6B

69

70

tt77

73

1c

l'{ame ot the Works

75

Qtr. No 2RA-10/7

Qtr. No 1R 37

Btock No T-6

etoi[ No rn asgtock No fR Oe

Btock No FR-28

Qtr. No F-99

Btock No ER-1

76 Btock No E-4

77 Block No T-12

78 Qtr. No FR-66/5

lJnlt / Area AmountRequired

(4\

UNIT-VIII

UNIT-VIII

RentaI cotony

C.S. Pur

C.S. Pur

C. S. Pur

eOa, C S.lr1BDA, C.S.Pur

0.3c

0.30

2.00

2.00

2.00

2.OO

0.35

2.00

BDA, C.S.Pur 2.00

2.00RentaI colony

c.s.Pur- 0.30

C.S.Pur 2.00' Rental cotony 2.00

Rental cotony 2.00Rental cotony 0.42

UNIT-VIII 0.45

UNIT.VIII 0.45

79 Block No FR-2

80 BLock No F-2

81 Block No E-8

82 Qtr. No E-49l1

83 Qtr. No F-22

84 Qtr. No 2R-35 Rd-A

(7) (3)(1)

85 Qtr. No 1R-5

86 Qtr. NoF-184, Expresswaycotony

87 Qtr. No 2R-35/1

(5)

UNIT-VIII 0.45

UNIT-VIII

UNIT-ViII

0.40

0.40

88 Qtr. No E-34 UNIT-VIII 0.40i 89 Qtr. No F-143

' 90 letr. No 2RA-4 Rd-A

,91 Qtr. No 2R-28 Rd-A

1 92 Qtr. No F-11, DPI Cotonyi93 lQtr. tto o-t094 Qtr. No D-10

95 tQtr. NoE-46/1

UNIT,VIII 0.40

UNIT-VIII 0.50

UNIT-VIII 0.50UNIT-VIII 0.50

Jayadev Vihar 0.50Jayadev Vihar 0.50

I Rental colony 0.40

UNIT-VIII

UNIT-VIII1.00

2.00Total=i 66.87

MLA Cotony 0.321MLA Colony I 0.959

Unit-lx (F) 4.716

Unit-lX (F) 4.886

Unit-lX (F) 4.031

Unit-lX (F) 0.995

2.449

1.286

Unit-lX (F)

Unit-lX (F)

Unit-lX (F) 1.562

96 r Btock Qtr. No E-33 to E-36

97 I Btock Qtr. No E-745toE-248

r iS/R to..-..i:

BBSR-IV 1 iDlS-10112,DtS-7t43 lBlock No-2RA-4'l

4 C-4-Duplex

5

6

1

8

c-5c-8Btock No. 2RA-'13

F-411

9 .2RA-2/3

10,7R4-3/1

E:\CE.(B)\SqR\2018 19\AMP 2018 19\a.M.P.-2018-19-01-10-2018\4.M.P. Res./10th Pton Res Pg_12/29

Unit-lx (F) ' 0.429

E:\C.E.(B)\SpR\2018.19\AMp 2018-19\A.M.p.-2018 19-O1-10-2018\A.M.p.-Res./11th pton-Res PE_13/29

r\or r rs rJr Lr rg r\cU r tE ur Lt te YYUI t\> UIIIL / AI Ed Amou n L

Required eu

(R&B) Division No

(1) (2) (3) (4) (5)11 B-4/712 B-3t613 F-11t3

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-X {F)UnitlX (F)

Unit-lX (F)

Unit-lX (F)

4.901

4.901

0.400

1.78614

15

16

F-4/3

c-'r 4.901

4.950B-5t917 zRF-2/8 0.349

o3qg18 2RF-2/16 Unit-lX (F)

19 2RF-2/17 Unit-lX (F) 0.35020 2RF-7 /2 Unit-lX (F) 0.35021 E-55t1 Unit-lX (F) 2.001

Unit-lX (F) 0.35023 2RF-7t3 Unit-lx (F) 0.35024 C-6DUPLEX Unit-lX (F) 4-73525 ,2RF-9/4 Unit-lx (F) 0.34926

t-tE-5 / 1

L

Unit-lx (F) 1.83227 C-3 Duptex Unit-lx (F) 2.03728 C-7 Unit-lx (F) 7.35229 E-45t2 Unit-lX (F) 0.39930 2RB-19t4 Unit-lx (F) 0.400

. 31 E-49t3 _9lt_tll1Il 0.3eUnit-lx (F) 0.40032 E-22t4

: 33 :E-5211 Unit-lx (F) 0.40034 D-16t1 Unit-lX (F) 0.59735 IZRB-19/3 Unit-lx (F) 0.400

i36 zRA-33/6 Unit-lX (F) 0.34937 1 2RB-39t4

_- iUnit-lX (F) 0.399

38 F-8t1 Unit-lx (F) 0.349i 39 F-814 I Unit-lx (F) 0.349i 40 i2RB-57/8 i Unit-lX (F) 0.399

1 41 ;F-116 I Unit-lx (F) : 0.349

i tz it-zon I Unit-lX (F) 0.400B )zRB-49/s Unit-lx (F) 0.399

o.34944 2RA-33/5 I unit-tx (r)4tizRA 38/7 Unit-lX (F) 0.400

i 46 t,2RA-26/3 Unit-lX (F) 0.40047 D-16t4 Unit-lx (F) 0.s9648 2RF-2/10 Unit-lx (F) 0.34949 2RA-30 Rd-5 Unrt-lX (RZ) 0.342

Unit-lX (RZ) 0.49650 2RA-2 to Zna-a-na-s51 2RA-85-Rd-6 Unit-lX (RZ) 0.34652 2RA-112 Rd-6 Unit-lX (RZ) 0.350

22 2RF-4/23

I

I\Name of the

(R&B) Division

SI Name oi ihe VVorks

53

54

55

56

57

58

No.

2RA-111 Rd-2

2RA-107-Rd-5

2na-ae na-rina-so-na :zna-zs -na :zde-70 -na-z

59 2RA-82 to 88 -Rd-6

60 2RA-128 -Rd-6

2RA-91 -Rd-761

62 2RA-5 BSC

63 tR-38-R-3

64 2R -41-R-4

65 2RA-105 to 2RA-111-R-5

66 t2RB-5-R-6

67 2RA-84-R-6

68 2RA-98-R-6

Unlt / Area Amou n tRequired

0. 345

0.396

0.3eE

0.499o.ioo0.3 50

0.990

(4)

Unit-lXUnit-lXUnit-lXUnit-lXUnit-lX

(RZ)

(RZ)

(R4)

(RZ)

(RZ)

Unit-lX (RZ)

Unit-lX (RZ)

Unit-lX (RZ) 0.301

Unit-lX (RZ) 0.348

Unit-lX (RZ) 0.349Unit-lX (RZ) 0.354

Unit-lX (RZ) 0.350

Unit-lX (RZ) 1.000

Unit-lX (RZ) 0.457

Unit-lX (RZ) 0.700

Unit-lX (RZ) 0.602

(2) (3)(1)

69 2RA-127-R-8

70 2RA-85-R-3

71 2RA-99-R-5

72 ZRA-67-R-7

73 zRA-39-R-4

74 tR-84-R-2

(s)

Unit-lX (RZ) 0.500

Unit-lX (RZ) 0.400

Unit-lX (RZ) 0.350

Unit-lX (RZ) 0.350

Unit-lX (RZ) 0.501

Unit-lX (RZ) 0.314

Unit-lX (RZ) 0.35075 -90-R-7

76 -60-R-5

77 2RB-31-R-6

Unit-lX (Rz) 0.998

Unit-lX (Rz) 0.400

Unit-lX (RZ) 0.850

Unit-lX (RZ) 0.350

Unit-lX (RZ) 0.350

i 78 2RA-109-R-8

tR-7-R-779l6[ llp.7ap-2

81 i2RA-52-R-5

82 i2RA-131-R-8

Unit-lX (RZ) 0.350

Unit-lX (RZ) 0.500

83 2RA-66-R-7

84 2RA-64-R-7

Unit-lX (RZ) 0.350

Unit-lX (RZ) 0.351

85 tlR-19-R-7 Unit-lX (RZ) 0.300

Unit-lX (RZ) 0.360

Un,t-lx (RZ) ' o.347

Unit-lX (RZ) 0.425Unit-lX (RZ) 0.350

Unit-lx (RZ) 0.400

Unit-lX (RZ)

Unit-lX (RZ)

0.498

0.361

Unit-lX (Rz) 0.360

0.499

86 rlR-19-R- 1

87 2RA-42-R-5

88 tR-67-R-5

89 2RA-'101-R-5

90 2RA-56-R-7

91 2RA-76-R-3

92 tR-33-R-7

93 2RA-1 3-R-3,2R4-8-R-5, 2RA-1 1 9-R-2

94 2RA-118-R-6

E:\C.E.(B)\SPR\2o18 19\AMP 2018-19\4.M.P. 2018-19 01 1G2018\A.M.P. Res./10th Plon-Res

Unit-lX (RZ)

Pg_1.4/29

E:\C.e.(B)\SPR\2O18-19\aMP 2O18-19\A.M.p.-201&19-01-la2018\A.M.p.-Res./7oth pton Res Pg_L5/29

t\ctl llg ut Lr lg .)t. t\d tc ut Lllc vY(Jt K> ull rL / Ar ed ArnounlRequired

q\a

(R&B) Division No.

(2) (l) (4) (5)(1)

95

96

97

98

99

100

IR-17-R-7

2RA-6-R-4

3R-15

3R-97

'1R-43

E-10-2/ 1

Unit-lX (RZ)

Unit lX (RZ)

Sainik School

Sainik Schoot

iar-nik Schoot

Sain* Schoot

iiinik Schoot

0.300

0.410

0.500

0.500

o.iit0.450

0.400101 E-16-11/3

107 wR-4/4]

103 tvR-3/1

CHC 0.400

cHc 0.485

104 2RA-l BSC 0.3 51

2RA BLOCK UNIT-IX 2RA-2 to 2RA-24 R-5 Unit-lx (Rz) 1.700

roolzn+zr+.+ Unit-lX (RZ) 0.400

107 2RA-95-R-7 Unit-lX (RZ) 0.500

108 tR-59-R-1, 2RB-27-R-6, tR-3-R-7 Unit-lX (RZ) 0.409'109 ;4R-2-R-6

110 2RA-106 to 2RA-128-R-6

Unit-lx (RZ) 1.581

Unit-lX (RZ) 1.661

111 Principal Residense Gritt & Uttra Tite Sainik School 1.500

112 t4R-1 VSS Nagar 1.000113 F-13-4/ 1 New G.A. Cotony 0.400

) 114 tD-4-1 / 1 New G.A. Cotony 0.400

115 ZRAF-I /7. Unit-lX(F) o.420

116 ,S/R to F-Type Quarters at Unit-lx (F), BBSR Unit-lx (F) 5.020(such as supptying of Sa[ wood

, pra3t wood ean:llutt:ll117 iS/R to 2RF Quarters in Unit-lX

choukaths &

(F) such as Unit-lX (F) 0.640'fitting & fixing of Sat Choukaths & poasallshutter etc.

Total = 1O7.115Bhubaneswar-V 1 E-42 Baramunda

area0.40

2 'E-45 Baramundaarea

0.40

3 E-49 Baramundaarea

0.40

4 E-50 Baramundaarea

0.40

5 E-53 Baramunda

area0.40

6 F-85 Baramundaa rea

0.35

105

l.lame of the(R&B ) Division No

l'lame of the Vy'orks

(3)

unit / AreaSi

(4)

Baramunda

a rea

Baramundaarea

Baramundaarea

Baramundaarea

Baramundaarea

garimundi

area

Amou ntRequired

0.3 5

0.35

0.35

0.35

0.35

0.35

27

8

F-86

F-87

9 F-88

10 F-89

11 F-90

12 F-91

13 F-92 Baramundaarea

0.35

14 F-93

15 F-94

Baramundaarea

Baramundaarea

0.35

16 F-95 Baramundaarea

0.35

0.35

0.35

0.35

17 F-96 Baramundaarea

18 F-97 Baramundaarea

(2) (5)(1)

19 F-99 Baramundaarea

0.35

z0 F-102

21 F-103

Baramundaarea

0.3s

Baramundaarea

0.3s

0.3522 F-105 Baramundaarea

J2 F-'t06

24

25 F-108

S/R to.....1 Judicia[ Officer Qr. No.C/4 in CDA, Sector-9,

Cuttack(Outside painting)

Baramundaarea

0.35

F-107 Baramundaarea

Baramundaarea

Toiat =

0.35

0.35

9.00

3.81Cuttack-l

E:\c.E.(B)\SPR\2o18-19\aMP 2018 19\a.M.P.-2o1a-E 01 1G2o1a\A M.P'Bes./loth Plon'Res PB_16/29

:.lame of the(R$B) Division

(1)

Amou ntRequired

si.No

Unit / AreaName of the Works

(s)(4\(2) (3)

2 Married Nurses Qrs No.7 in SCBMCH, Cuttack

1F[ooi Lile, wail 'ril.e L Cislcitrpcting)

3 Qr. No.E/2 of New Revenue Cotony, TV

Centre, Tutasipur, Ctc

4 O. No.C/17, Otd C.Tax Cotony, Deutasahi,

Tutasipur, Ctc

5 G type Qr. No.G-2l1 near Canal side,

SCBMCH, Cuttack (Ftoor tite, watl tite &

distempering)

0.70

1.05

1.12

0.96

6 PWD Staff Qr No.E-2l4 at Otd lB Campus,

Gorakabar, Ctc

7 Qf. No.E/1 8.El4 at New Revenue Colony, TV

Centre, Cuttack

1.74

1-95

8 Behera tine staff Q.r, SCBMCH, Cuttack (Leak'proof treatment)-

0.91

9 Qr. No.Vl/8 at Otd Ambatota CoLony, BOSE

Campus, Cuttack

1.92

10 Qr. No.D/4 at Division office Back side,

iCuttack

11 Qr. No.2RF/'1 at'cuttac

C.Tax Cotony, Deulasahi,;

1.96

0.63

12 Q,. No.UGC-D/3 &D/4 of RNT Cottege (G+1)

(Ceramic tite, PVC shutter, AS ftooring,painting)

7.46

13 Qr. No.S.O.-14, Cantonment (C.Watt) 4.10

14 Qr. No.S.O.-1, Kiltafort, Cuttack 3.80

4.2015 D type Qr. at Division office back side

1 6 l5weeper Line Qr. No.l to 10, SCBMCH, Ctc

' 17 :Q.r.No.D/4, New Revenue Colony, TV Centre

. (1st floor), Ctc

3.16

0.63

I 18 tQr.J.O.19 at KVK Cuttack(Constn.of, drain,left side concreting,c.watt raising

balance tite ftooring ,out side painting etc

19 Qr.No.lV/2,3 in BOSE Campus Cuttack(Vitrified tite ftooring, distmperinq, door &window painting)

4.99

3.49

1.40

71 CB-2 (lnside,outside painting etc.)

to 6 in BOSE

concl-ele,ftooring chukaths

20 10nos Peon Qrs No.1

Campus(Graditrgdistem perlng, paintng ti[efixing)

(4

&

E:\C. E (B)\SPR\ 2018. 19\At:'1P 2 O 18- ig\A. M P 2O13.19-24-07 2A18 CD\A-M P Res./1oth Plon Res Pg_17 /29

(1) (2)

Sr l\ame oi iileiR&B) Division

SI l.lame of ine Vr;orks Unit / Ai-ea Amouna

Required

0.80

7.90

4.50

f.lo

(3)

22 Qr.No.lV/.1 inBOSECampus(Roof graciing ou;_hrr-1,,,t .cpllt.aail)alt: itlilii:tg J:ri,',..;:rJ;,,.paintrg)

2l Qtr l{o S. C- 1 9 neai I . p. S Mes:;

Cuttack(approach road)

24 Fireman Qr. (OFS-16/1R ro 20l1R), Cuttack

25 Qr. No.J.O"-5 at KVK road, Cuttack26 Qr. No.J.O.-24 at Stadium back side, Cuttack

2.00

1.00

(4t (5)

27 Qr. No.B/5 in C.B.-9 (occupied by Spt. JudgeVigilance)

2. s0

28 Qr. No.B/7 in C.B.-9 (Transit House) 2.0029 Qr. No.C/1 (8tock-1)in C.B.-6 (occupied by

Dr. Sandhyarani Behera)1 .50

30 Qr. No.C/3 (Btock-1)in C.B.-6 (occupied bySri Debasis Rout)

1.00

2.00

2.00

Total = 71.OO

Cuttack-ll

31 Qr. No,C/2 (Btock-2) in C.B.-6 (occupied byDr. Nibedita Das, DFO)

32 Qr. No.C/2 (B[ock-3) in C.B.-6 (occupied bySj. Barik, R. University)

S/R to.....1 S R to OGP Staff Qtr No tV 8, Madhupatna

Cuttack for the year 7018-1904

2 5 R to Block B and C at New LIC CotonyBadambadi

0.95

3 S R to Qtr NO A9 at New LtC CotonyBadambadi Cuttack

0.43

4 S R to Resjdential Buitding Const at New LICColony Badambadi Cuttack

3.19

5 S R to Res Buitding at Otd LtC CotonyBadmbadi Cuttack

0.80

Ps-18/29

6 S R to Qtr no R 195 at New LIC ColonyBadambadi Cuttack

3.60

7 S R to Qtr No L 125 of CCT Dept at New LtCCotoony

8 S R to CCT Dept Staff Qtr at New LtC Colony

9 S R. ic Qri-i'lc E 9 and i',, i39 of CCT Dept aiNew LIC Cotony Badambadi Cuttack

10 S/R to 3Nos. D.A.O. Staff Qr. at Banki for2018-19

1 .09

1.45

7.50

51Cf./3/\5PFi2ci-?lgjAi\,lr^2018 19\,A.M P 2018 19 24 A7 2Al3 aD\ :. tv1 ) Res/1ai.ptclqes

1

€i*lame of the

(RiiB) Division

(1)

SI

No.

11 Construction of Staircase inside Otd LIC

Coloiri, Da..j.rrl':lJi, Cuti:cl. fcr i.hc ycrr'1S19 Qtr No. ZRAEl49 to E/60.

12 Construction of Starrcase inside Otd LIC

Cotony, Badambadi, Cuttack for the year 18-

19 Qtr No. ?RAFl61 toFl72.'lJ Construction of Staircase inside Otd LIC

Cotony, Badambadi, Cuttack for the year 18-

19 Qtr No. zRAG/73 to G/84.

2.50

2.50

7.50

Total = 24.00

Amou n tRequrred

U nit / AreaName of the Works

(5)(4\(2t (3)

S/R toKendrapara I CotlectorResidence,atKendrapara

2 ResidentiaI buiLding of Sub-cottector,Kendrapara

1,00

1.00

3 'Residence of A.D.M., KendraPara 1.00

4 Residence of Tahasitdar, Kendrapara 1.00

5 2nd officer qrs. at Officer's colony

Kendrapara

1.00

Tota[= 5.00

S/R toJagatsinghpur 1 Staff Quartes of Agricututure Department

2 Staff Quartes of Commerce Department

2.003.00

Total= 5.00

S/R to.....Panikoili 1 Staff Qrs of DDM at Jajpur Road 2.00

2 Staff Qrs of PWD Cotony at Jajpur Road 1.00

3 Staff Qrs of PWD Cotony at Panikoiti 2.00

Dhenkanal 1

S/R to.....5/R to PWD staff quarters No. PW/8,

PW111,17,13,14,16&-24 and 43 atDhenkanat.

Total= 5.00

4.26

2 S/R to PWD staff Qrs. No. PW/3 , PW/20, &

PW/31 at Dhenkanat.

4.77

1 .583 S/R to Revenue Qrs. No.R/40, Rl44 &.R/48 atGudiakateni

4 S/R to V.S Qrs. at Kamakhyanagar 7.39

Total= 13.00

Angul

S/R tc-. -. -

1 Veterinary slaff qrs., AnguI

2 C.T.O. staff qr at Angut

3.00

2.00

3 Staff qrs of DHH, AnguI 7.O0

E:\C !.(6)\SPR\2a18-19\aMP ?O16 19\a M P.'2016-19 21 07 2A1E CD\,A M ? Fe< t/1otn Pton'R?\ Pg-]9/29

l\.1ir Lc Ul -ile

iR&B I Drvr srcn

Charbatia

si.l'.1c.

\dIIIg IJi LI LC YYU K\ Unii / Area Amol.r n .

RequirBd

(s)(3)

4 'F lype Qr. (2nos) of S.D.H. at Arhmatlikll \11 . ,.t , _L ^ .1"-:...r

6 2 Nos D-Type Qr (LDC) Athmattik7 Slaff Qr. (Head Master) of Mahendra High

School at Athmattik

S/R to.....1 5 nos. Teacher's qtrs. at Govt. Girt's High

School campus-

2 Staff qtrs. of SDH at Athagarh

(4)

1 .00

J.:u1.00

0. 50

Tota[= '10.00

2.00

3.00

Total= 5.00S/R to.....

Ganjam-l 1 UCP Engg.staff quarter, E type Berhampur 2.002 Womens' Potytechnic Staff quarters 3.00

2.003 UCP Engg.staff quarter,F type Berhampur4

)6

7

8

lTl Staff quarter,at Berhampur 3.00

levenue staff qurtr at Digapahandi

Veterinarystaff Qtrs at ChikitiStaff Qtrs of Sub-Registrar Office at Hinj iIi

2.00

2.00

2.00

Staff Qtrs of R.H.C at Digapahndi 2,00

7oo9 Staff Qtrs of C.H.C at Digapahndi

10 Commercial Staff quarter,at Berhampur11 Staff quarter of P.W.D at Digapahandi

3.00

1.oo

Tota[ = 25.00S/R to......

Ganjam-ll l Tahasil staff qrs. At Purushottapur 4.002 Asst. Surgeon qrs at Chatrapur 2 nos 3.003 Staff qrs of Transport Dept. at Chatrapur 14 nos 2.004 Staff qrs of Heatth Dept. At Rambha 4.005 Staff qrs of pHC at Ganjam s.006 Staff qrs. Of Arts & Crafts cottege at

Khattikote3.00

Total= 21 .OO

S/R to.....Bhanjanagr 1 S/R to 2Nos E Type PWD Staff Quarter at

Sorada.

Si R to S.B. High Schoot H.M Quarter atSorada.

-. ii'.r r i,D S.ii.; Q-;rttis irti,r iitse ir i...rr ;iBhanjanaqar

Tahasit Staif Quarter at Bettaguntha

1 .50

1 .502

_)

4

J . Ll\,

1.00

7.O0

t'a.al9l\SPP\.2C:a-i-o\tAN1P2O1819',,\M, 2Di€.:a,atA-.:Ct?at\.-^ip Be: /-.:.t pta. ?.,

Total=

Amou ntRequired

st.

No

Unit / AreaName of the Works

(5)(4)(2\

i.lame of the(R[t B ) Division

(1) (3)

S/R to. .. ..

1 Sr R ro lies burldrrrg suclr as icpaii Lo QLI aL

OLD LIC Colony. Phutbani.

2 S/R to Res buitding such ii repair to Treasury

cotony, Phu Ibani.

3 S/R to Res buitding such as repair to Medical

staff Qtr., Phutbani.

4 S/R to Res buitding such as repair toTreasury road Phulbani.

Phulbant 1 .C0

0.30

0.90

0.80

5 S/R to Res buitding such as repair to Qtr No.

1 EMG near ADM res DPC Qtr No. 5 atTreasury cotony Phutbani.

1.59

6 S/R to Res buitding such as repair to Qtr No.

F-1 ,2,7,14 E/5 at RHS-48 & QtrS & 47 atOLC

cotony Phulbani.

1.94

7 S/R to Res buitding such as repair to A.E

(South) Qtr at Phutbani

1.37

B S/R to Res building such as repair to Qtr No.

G-15, E-13 at LIC co[onY KenduPadar

Phutbani.

1.'10

Total= 9.00

S/R to.....Boudh 1 Trearsury Colony E TyPe Qtr 0.40

2 2 Nos Trearsury Staff Qtrs. (Smt. G, Nanda &

Sri Ganeswar Mal.tick)

2.00

3 3 Nos Trearsury Staff Qtrs. (Sri P.K Kanti, Sri

P. Behera & Sri P.C Kanhara)

3.00

4 3 Nos "D'Type G.G.H.S.Teachers Qtr Boudh

5 PWD E.E.Res Boudh

S/R to.....

2.00

1.60

Total = 9.00

Baliguda 1 S/R to Education Staff Qr. (2 nos.) such as

Washing, Painting, Door &. Window Repair atBattiguda-

1.00

2 Revenue lnspector Qtr. at Battiguda 1.00

3 Residential Qtr. of Executive Engineer ofPWD (ReB) Division at Battiguda.

4 Harticatcutist Qtr. at BattigLtda.

5 S/ R to Kotagarh .lunio-ngineer Res. At

Kotagarh.

7.00

100l.ou

6.00

Ei\CE.fB)\SPR\201S 7?\\AMP 2013 19\A M-P.-2O18-19'21'07 2016 CD\A.^/1 P Res./lAth Ploo Res

Total=

Pg_2L/29

w\ 1 Name oi L'ne

lREB I Drvr slo n

)tI'lo

l.rame of the Vy'orks unit / Area Amou n r

Requir,ed(1) i rzr

l(.

(3)

S/R to.....I l.;;,t;l i-.o Coile,-ior lic'siiertee2 Repair to J.E Qr. at Laxmipur.3 Repair to 'i 0 nos. D. B Qtr. Near Munispalty

Off ice

Repair to 6 nos. Teacheis Qtr. Near Govt.High Schoot

Repair to PWD Qtr. no-31 & 34

n"pii, to Veternary staff Qtr. No-11 to j 5

t4l (s)

2.00

2.00

2.00

2.00

i. Url

3.00

2.00

4

)6

7 Repair to 4 nos. "E" type Qtrs. Of StatisticalDept.

8 Repair to 4 nos. RHS Qtrs. Near E.E, PHD

Residence1.00

9 Repair to DNK staff Qr. no SRBD-I ro 4 (4nos. ) at Koraput

2.00

10 Repair to DNK staff Qr. no. SRBG-1 to 3 & 6(4 nos. ) at Koraput

Repair to DNK "G" type staff er. no. G/1,G/2 (2 nos. ) at Koraput

2.00

2.00

Tota[= 23.00

11

S/R to.....Jeypore 1 S/R to 46 Nos Revenue Staff Quarters at

Jeypore

lmprovement toHostel at Jeypore

1

7.007

00

ftooring of DIET Ladie:;(Part-B)

3 S/R to DIET

Jeypore.staff qtrs. at Medristreet, 5.00

4 S/R toJeypore.

Vigitance 3 Nos. E-Type Qtrs at 1.00

5 Veterinary Staff Quarter at Kotpad 1.00

Total = 10.00S/R to.....

Nawarangpur 1 S.D.V.O. Staff Quarter, Nabarangpur 2.002 2 Nos. "D-Type" Quarter for PWD Staff,

Nabarangpur5.00

3 PWD Staff Quarter, Umerkote

S/R to...... a-tt.-L^--Lr rr^.+ t-\.. -, ,r- ,^^^.;-,.

\ ) !:.:'l_.tl.i. i..r

2 Tahasit staff Qrs at Matkangiri3 D.E.O Qr at Malkangiri4 Sub-Cottector Qr at Malkangiri

Tota t

3.00

10.00

1.00

1.00

1.00

6'a:15r15r.:a:?:2.\t,1e2A1a:t/.^,1 p )aj8 19 2,:-A7 2Oi3 C: : ...3 Ae: l:ai, t,:c. ir, PE_22/29

5 P.D D.R.D.A Qr at Matkangiri

S/R to.....Rayagada- I 1 S/R to 4 Nos E type treasury staff quarters at

Rayagada

2 S/R to 2 Nos F type treasury staff quarters atRayagada

3 S/R to 5 Nos F type quarters for DHH staff atRayagada

Toi-al .1.00

5.00

1.00

1.00

1.00

4 SlR to 1 Nos E type quarters for DHH staff at, Rayagada

'l .00

5 S/R to 3 Nos D type staff quarters for DHH atbarijhota

6 S/R to 9 Nos E type staff quarters for DHH atbarijhota

1.00

1.00

Total = 6-00S/R to.....

si.No.

Name of the Works Unit / Area Amou ntRequired

;.,iame of the

1R&B) Division

(2)(1) (3) (4) (s)

Rayagada-ll 1 Tahasitdar office Qr at gunupur

2 D'typeTahasil Staff Quarter

2.00

2.00

Total = 4.00

Paralakhem undiS/R to.....

1 Repair & Maintenance of Staff quarters ofDHH at Pkd.

4.00

Tota[ = 4.O0S/R to.....

Sambalpu r-l 1 Repair and Renovation such as Ceitingptaster, colour work at Residentia[ Building ofR.D.C. (ND) Sambatpur

2 rSi R for repair and renovation of A.D.m. i

Quarter at C.S. Colony Sambalpur

1.19

1.36

i3 S/R to Qtr No L.D.-3 at C.5SambaIpu r

Cotony, 0.88

4 SlR to Qtr No UD-25 at Commissioner'sCotony, Sambatpur for the year 2017-18.

1.87

5 5/R top Qtr No-2RA-3,4,5 &. 6 such as

Extension of room at Commissioner's co[ony,Sambatpur

6 S/R to Qtr No LD-22 at Commissioner'sCotonv. Sambatpur

2.18

1.93

E \C.E.(B)\SPR\2AU-i9\AMP 201a E\A M.P.-2ai8 J9-24-a7-2o1a CD\A M p. Rc\ /tCth pton-Ret PE_23/29

,*Name of rne

(REtB) Dlvrston

>t

l!oi\arrre Or -r-ne VvOTKS unit , Ai-ea AifrO r-r n L

Requrrqd

3.29

(1) (2) (3)

7 S/R such as Supptying fitting & frxing of Paver

:.-'.-' . . ;:J ;, -..: -: i.l.].1.1.-. ,,. .

A.D.M Qtr at C.S. Colony SBP

S/R to PA to Cotlector Qtr at Binakhandi.

SambaIpur

Extension of Additionat Room at Vigitancc'

Staff, Qtr No. CB-1 at Vigi[ance Cotony, Jail.

Chowk, Sambatpur

10 Aggriculture Staff Qtr at Mod'ipara.

Sambalpur. (2 Nos. Qtr)11 Horticutture &. Fishery

Sambatpur. (2 Nos. Qtr)

Staff Qtr at

\4)

8 3.50

3.009

3.80

4.00

Total = 27.0O

(s)

S/R to.....Sambalpur-ll 'l 5/R to Residential Buitding such as repair tc

V.A.S quarter at Burta.

2 S/R to Residential Buitding iuch a-provldingplastic feLt to quarter No. 3R/21, 3R/22,

Dt11, Dt12, 3Rt43, 2RBt7, 7RBt8, 7RBt9,2RA/17, F/ & FB of VSS IMSAR, Burta

3 S/R to Residential Buitding such as providingptastic felt to quarter No. 3R/21 , 3R/22,D/11, D/12, 3Rt43, 2RBt7, 2RB/8, 2RB/9,

2RA117,F/ & F8 of VSS IMS.AR, Burta

3.86

4.83

4.66

4 S/R to Residence of Executive Engineer,

Sambatpur (R&B) Division No.ll for the year

7017 -18 (Fixing tites & paver block in

Courtyard)

4.65

Total = 18.00S/R to.....

Jharsuguda 1 Staff Qrs Education Deptt. 3.00

2 Staff Qrs Block'B' lndustry Deptt.Jharsuguda

Tll:i =

3.00

3.00

2.00

11 .00

2.00

3 Lecture Qrs llduslyes De{!. Jjrarsuggda

Ctass lV Staff Qrs lndustries Deptt.

S/R to.....1 Repair and ienovation to staff Qrs of

Panchayat CoItege Bargarh.

4

Baragarh

5ra:/6/1SP llcr.: r! jijP-lol5:l rr.': :l:S:rr_ra':alsa:'4:':'Res/l)thPlonqes Pe_24/29

Name of theR&B) Divlslon

AmountRequired

Name of the Works Unit / Area

(4)(3)

(

(7\ (s)(1)

Sr.

NC

eU

2 S/R such as repair & renovation inctudingCrrri i:P.il L pi,.rvisioit Ji pDiLi.o wtlll .Jl'-)'.iI

coated sheet to Headmaster's Qr.Govt. Boys

High School Barpali

3 S/R such as repair & renovation inctudingCivit &P. H for West Hostel (staff Qr. ) of Govt.Boys High School Barpati

3 .00

2.00

4 S/R to Schoot S.l. qtr at Attabira. 2.00

Total= 9.00S/R to.....

Bolangir 'l Cotlectoriate Res , Batangir 2.00

2 ADM Res,Balangir 1.00

3 Sub-Cotlector Res, Batangir 2.00

2.004 PD,DRDA Res,Batangir

5 Revenue Staff Qtrs l0Nos,Ba[angir 2.00

Total= 9.00S/R to.....

Kantabaniji 1 S.T Schoot. Staff quarter at Tititagarh 1.00

2 ACTO staff Qtr. at Titilagarh 1.00

3 SDVO staff Qtr. at Tititagarh 1.00

4 VAS staff Qtr. (02 Nos) at Tititagarh 2.00

Total= 5.00

Sonepur

S/R to.....1 S/R to 2 Nos. Doctor Quarter of Sub-

DivisionaI Hospital at Birmaharajpur

2 2 Nos. E Type quarter of District Sub-Treasuryat Sonepr

3 '2 Nos. Staff Quarter at UGPHC atBirmaharajpur

4 1 Nos. C Type Executive Engineer Quarter atSonepur

3.00

2.00

2.00

?_.00

Total= 9.00S/R to.....

Kalahandi 'l A/R to Horticulture staff quarters atBhawanipatna

2.00

2 S/R to Tahasildar quarter compound walt atDharamarh

Si R to Revenue siaff quaer ar Nal,.iigucia

2.00

-) 1,00

4 S/R to Revenue staff quaer at ry centre Pada 1.00

E \C E (9)\SPR\2AiE i9\AL4P 2016 79\a it4 P .2A1E Lc 24-A7-2O18 CD\A.M.P -Res /1Ati) Pton Res P E_25 /29

74/)

)L

t!ame Oi Lire

iR&ts ) D ivi,.io n

Khariar

)i.l\l o

I'tame of tne 'rv'oi-ks Unri r Area AmoLr ni

'-i'':

5 5/R to Revenue staff quarter at Pardesipada

(7) (3)

rl ! l'r'.. lr- ipf,:irl6 S/R to R.T.O. & RTO staff qtrs. at

Bhawan ipatna

7 S/r lo 4 Nos Revenue staff quarter atDharamagrh

B A.D.M- Resldence Bhawanipatna

9 Tahasitdar Residence Bhawinipatna

S/R to.....1 S/R to Staff Qtr.of Govt. Girts School at

Nuapada.

(4)

Total =

(s)

2.00

2.00

2.00

2.00

2.00

16-OO

2.00

2 S/R to Twin Compounder Qtr.at DHH,

Nuapada(Qtr.No.1 & 2).

'1 .00

3 5/R to staff Nurse Qtr.of DHH at Nuapada. 2.00

4 5i R to BEE & LHV Qtr.at CHC Khariar Road.

5/R to Compounder & rNo; ANtil qii.ui cHcKhanar Road.

S/R to.....

1 00

005 1

Total= 7.OO

Balasore-l .l Repair and Renovation to Sub-CottectorResidence at Nil.giri such as Construction ofCompound watl

2 Repair and Renovati,on to Rerenue quarterOccupied by Kausatya Behera at Nitgiri suchas Construction of Compound watl

2.00

0.50

3 Repair and Renovation to Revenue StaffQuarter No-l to v at Nitgiri such as Ptaster,Roof. Watt, Cotour Door & Window Damagedetc.

2.00

4 Repair and Renovation to Revenue StaffQuarter No-V to lX at Nitgiri such as Ptaster,Roof, Watt, Colour Door & Window Damagedetc.

5 Repair and Renovation to C/R type S/S

Quarter for Sub-Treasury at Nitgiri such asPtaster, Roof ,Watt,Cotour Door & WindowDamased etc.

1.00

1.00

i a.:l!t\so2\2c'319\,attP2078-19\/\MP 201.e , 9 2. a: -aa13 at -: ir. ,r.i /'lnr. rtc-.p.]

(1)

i'lame of the(P&B) Dlvisron

(1)

o'v

6 Repair and Renovation to "D" Type quarter forADAO at Sor o su;h ;sPlaster, Roof ,Watt,Cotour Door & WindowDamaged etc.

7 Repair and Renovation to 5ub-Registerquarter at Soro such as

Ptaster, Roof ,Wat[,Cotour Door & WindowDamaged etc.

0.50

0.50

8 Repair and Renovation to 2Nos E Typequarter of Sub-Treasury at Soro such as

Plaster, Roof,Watt,Cotour Door & WindowDamaged etc

0.50

Total= 8.O0S/R to.....

Balasore-ll 'l "F'type Quarter of G.K. Bhattar Haspital atJateswar

2 "F'type Quarter of Sub-Treasury at Bhograi

3.00

7.50

st,

No.

Name of the Works Unit / Area Amou n tRequired

(7) (3) (4) (s)

3 R/R to Qr of Sri Raghunath NayakPharmasist at DHH Batasore

2.00

4 R/R to Qr of Sri Joges ku MohapatraPharmasist at DHH Balasore

2.00

5 R/R to Qr of Susmita Ray staff nurse at DHH

Batasore0.50

6 Ri R to Qr of Kabita Biswal staff nurse atDHH Batasore

2.00

Total= 12.OO

S/R to.....Bhadrak 1 R.l. QRATchandbali 1 00

2 ]SUB-REGISTAR QRS AT BHADRAK 1 00

3 ,'E' TYPE QRS.

BHADRAK

OF VIGILANCE UNIT AT 1.00

4 'F TYPE QRS. OF VIGILANCE UNIT AT BHADRAK 1.00

5 'C' TYPE QRS. OF VIGILANCE UNIT ATBHADRAK

1.00

Total= 5.00

MayurbhanjS/R to.....

1 S/R to Staff qtr of Fire station offic atBaripada.

2 5/R to Coltector Residence buitding at Baripada

1.00

7.O0

E \C f (B)\SPR\2O18 19\AMP 2018-i-a\A.tri P 2A18 19 2+A7.2a18 Cc\A.iri.P..Res./:Ati1Plon Res Pg-27 /29

47+)

l\ame or ine

1REB.; Dlvl:1cr.

)!

\oName oi the WorKs

(3)

Linir, Area Amcun.Req uir"ed

(s)

2.00

2.00

2.00

2.00

1 .50

l

4

5

Repair to Resicjence of District Magtstrate,\\rl rhr..r \. -lf n I, i- \ l.._t -

S/R such as constiuction of cycle stand atResidence of District Cottector, Mayurbhanj

S/R to 2 nos'F type quarter occupied by DPM

& Pharmacist of D.H.H. at Baripada.

5/R to 8 Nos."F"type Qrs.near Baghaghara atBaripada.

7 S/R to Boys High Schook Head Master Quarterat Udata

6

8 Repair to Girts High Schoot Staff qtr. at Udata

9 5/R to PD,DRDA Qrs.at Baripada .(such as

outside painting)

10 5/R to CDMO Qys.at DHH at Baripada .

1.00

1 .50

1.00

Total= 16.005/R to.....

Rairangpur 1 Pharmasist Qr at SDH, Rairangpur occupiedby Smt Laxmi Bindhan i

2 nos E type Qr for ine staff;f SDH,

Rairangpur

3 Twin Doctor Qr.No.2 of SDH Karanjia(Occupied by Dr.M.R.Singh)

4 "D'type Doctor Qr. of SDH Karanjia(Occupied by Dr.SuLochan Naik)

2.00

7.002

1.50

0. s0

Total = 6.00S/R to.....

Keonjhar 1 Repair to G.E.D. Staff Qrs 9 Nos. near MiningCotony, Keonjhar.

2 Repair to Cottectorate Cterk O at Park Line,Keonjhar.

3.00

2.00

3 Repair to S.l. of School Qr near Nuasahi, JailRoad, Keonjhar.

2.00

4 Repair to Govt. Girts High Schoot A.H.M. Qrat Keonjhar.

5 Reparr to 4 Nos. Teachers Qrs at Park Line,Keonjhar.

O Ofype quarters 4 Nos. of DDA at Madhapur

S1R to.....'1 R/R to S.D.V.O quarters at Ghasipura.

2 R/R to l.T.l staff quarters at Salapda.

3 R/R to l.T.l Principal quarter at Satapada

2.00

2.00

2.00

13.00

Ghatagaon 2.00

3 .00

2.00

5',:iilri:.2!:8 19\: .r-01819 At/] ) 2012 i9 :.! Ct 2C13 iD\A U 9 Re!/:Ait1pc.?e5

Total=

Pg_28/29

(1) \7) t4l

v)+v.Narne of rhe

(R&B ) DivjsionSI Name of the Works Unit / AreaNo.

(1)

Sundargarh 1

2

3

Amou n tRequired

4

5

(3)

SlR. to.....ADB Cotony Qtr No . I to 9 at ADB Cotony,Sundargarh

CDMO Residence at Sundargar hMedicat Staff Qtr at SundragarhS.P. Residence at SundargarhVigitance Staff Qtr at Sundargarh

Total = 7.OO

(41

1.50

1.00

1.00

1.00

2.00Total = 6.50

S.R. to Govt. Residentiat Buitdin

(7) (s)

208.o7.

1040.00gzt -q 3

\ .1L r\o

aneswaruitdings)Chief Engin

Odisha, B

eerhub

Gand Total=

fj\a f./3)\SPPI.?Cj"e .:-.\\At 4P 2018 J9 ,A t,l p--2A18-19 21 A7 2O1B CD\\A t a.F..Re\ ,,10!t: ptan ;es P g-29 i 29

-

l\al r le ul LllE

(R&B) DivisionSI

No.

t\dlllc ui Lttc vvul [5 Urrrt / Area Antour-ri

Required

(1) (7) (3) (4) (s)

STATE/v\Ei{T

Periodica[ - Residential Buildinss

S/R to.... .

SR to PWD F lype Qr. at NimapadaPWD 'E' type Qr, at Nimapada

D'!yP" qr. of SDo PWD NmaPadaSr to Five (5) Nos PWD Staff Qr. aiNimapada

S/R to One C'type Qr.of Revenue

department occupied by CEO,

Municipatity at Puri

(Rs. in Lakhs )

@,y

Puri 1

7

3

4

5

1.00

1.00'l nn

2.00

1.00

Total= 8.00

KhordhaS/R to.....

1 CHC Staff Qtr. at Jatani Qtr.No-92 Medical officer qtr. at Jatani3 Veterinary staff Qtr. at Jatani4 Sub - Trasuary staff Qtr Banpur

S/R to.....

0.50

0.50

1.00

1.00

Total= 3.0O

Nayagarh Asst,Jailer Qtr of otd jait Buitding ofRev. Deptt at NGR.

0.50

2 JE (R&B) No.2 Qtr at Nayagarh.

3 PWD JE Qtr at Ranpur.0.50

0.50

1.004 Teachers Staff Qtr (8 nos) atKhandapada.

5 Revenue Qtr No.'12 _- j{gTotal= 3.O0

S/R to.....Bhubaneswar-l 'l S/R to Q.r No ll-3/2 Unit-lll 0.500

0.5002 S/R to QWr No ll-416 Unit-lll3 S/R to Qr No IYB-1112 Unit-lll 0.5004 SlR to Q,r No IYB-2/3 and 2613 ' unit-lll 0.3505 5/R to Qr No IYB-4/2 and 23/1 Unit-lll 0.4006 /R to Qr. No. IVB - 50/27 SlR to Qr. No. IVA-4616

Unit-lll- Unitf l

0.500

0.500

0.5008 S/R to Qr. No. IVA-2215 Unit-ll9 S/R to Q.r. No. VA-26/1 Unit-ll 0.45010 S/R to Qr. No. IVA-21/5 Unit-ll 0.50011 S/R to Qr. No. IVA-33/412 S/R to Qr. No. IVA-30/32l1

Unit-llUnit-ll

0.500

0.450

0.450

0.450

0.450

o. soo

13

14

S/R to Qr. No. VA-34/1

S/RtoQr. No. lvA-35/515 5/R to Qr. No. 2RA-10/12

Unit-llUnrt- ll

fOtpana lrea16 S/R to Qr. No. IVA-21/217 S/RtoQr. No. IVA-10/6

Unit-llUnitf l

f :\c. E.(B)\sp R\2o18.) 9\AMp 2O18 19\A. M. p_-2O18- 19 O1.10- 2O18\A.M. p. -Res. periodic- Res

0.400

Pq 1/26

1

A). (1) (2) (3 )

-:: _, .-

13

19

70

21

'>1

23

24

25

76'ri

z8

S/R toS/R toS/R to

5/R to

5/R toS/R to5/R to5/R toS/R toS/R to

t.io.

No.

No.

No.

No.

No.

No.

No.

No.

c..100

0.400

0.300

0.400

0.450

0. s00

0.400

0.400

0.400

<'E .,-r

Qr.

Qr.

Qr.

Qr.

Qr.

ar.ar.ar.Qr. No:

9llo.Qr. No.

rvA-3 5 i 2

wR-417

zRA-45

vA-37t4tvA-25/2tv A-10t4

Yt-Dts-4/ 1

tvA.9/3zRB-5/7

vA-33 / 1

wA-26/78-4zRA 87iva-{zil

! ni'1. ii

Unit-l I

Unit- ll

Unit- ll

Unit- ll

Unit- ll

Unit-llUnit- ll

Katpana Area

Unit-llUnit-ll

Katoina area

Unit-llKatrana area

Jnit-lIlnltliJ nit- ll

(s)

0.400

0.400

osoo0.500

oiooo,+oo

0.400

0.400

79 S/R to

19 S/R to Qr.31 S/R to Qr. No.2RA-8/9

No

37 S/R

:: slntoQr. No. IVA-4514

to Qrs. No. ll-8/6to Q,r. No. IVA-1/3

Qr. No. VA-34/4

34-35 s/Rs/i

]6 S/R

{t irni8 s/R39 5/R

tototo

Qr. No. IVA 2514

Qr. No D-79 & D-81

Jnit- ll

Unit-ll

Jnit- ll

e.iB Area

Jnit- ll

.lnlt-ttlJnit- II

0.400

0.400

o. soo

0.400to Qr. No. ll-7l4ro Qr. No. VA-1214

40 S/R to Qr. No. VA-18/3

41 S/R to Qr. No. IVR-14/2

42 S/R to Qr. No. VA-25l343 5i R to Qr. No. IVR-10/1

0.400

o.4oo

0.400

44 5/R to Qr. No. VA-30/1

lJnit- ll

Unit-lllJnft-ll

0.400

o.4oo

0.500

45 S/R to Qr. No. IVA-31 /5 lJnit-ll 0.400

46 S/R to Qr. No. 2RA-4 lJnit- ll 0.400

47 S/R to Qr. No.VA-74/4 tJnit- Il 0.500

48 S/R to Qr. No. IVR-8/2 tJnit-ll 0.400

!.,40049 S/R to Qr. No. ll-16/6 Unit-ll50 5/R to Qr. No. 2RA-44 Unit-ll 0.400

I

51 Si R to Qr. No. llR-2/3 tJnit- ll 0.300

52 S/R to Qr. No. VA-9/2 tJ nit-ll 0.500

53 S/R to O. No. 2RA-42 tJnit- ll 0.500

54 S/R to Qr. No. ll-19l4

l! s/R t9a! ryL-191456 S/R to Qr. No. VA-19/2

S/R to Qr. No.

S/ R toS/R toSi n t,ts7n to

Qr.fo:Qr, l{o.Qr . liu.

Qr. No.

No.ar.Qr. No

vA-19 / 1

zae-i11wA 47 is\A -0, iiln-i/swA-2/4i5ZRB-Z/5

tJnit- lltJnitlltJnit- Il

Katpani Area

tJnit-ll

rl llit l,

LlnitliLJnit-ll

Xatpana Area

tJnit- ll 0.400

o3000.500

osooorooo.+oo^-.-\.1 . )ilU

o.iooo. soo

0.400

57

58

59

o0

61

62

63

S/R tos7R to

f:\C.E.(B)\SPR\2O18 19\AMP 2018 1.9\A M.P. 2018 19 01.10-2U8\A.M.P.-Res.Penodt Res Pq_2/26

Itame oI tne(R&B) Division

(1j

51..

l.{o

64

65

66

67

68

69

l"lame oI '!ne vi oTKS iJIlla / AI-ea AmountReour red

0.500

0.400

0.400

0.400o.roo

eAk

S/R to Qr.S/R to Qr.S/R to Qr.

S/R to Q5.

S/R to Qr.1t1

sr!9 Ors/!t9]q.S/R to Qr.S/R to Qr.

No. D'100

No. 2RB-7/ 12

No. ll-1//5 r,---No. IVA- 1 /2No. IVA- 37l 39/4 and

A4useum Ared

Katpana Area

Unit'llUnit-llUnit-llIVA-

70

No. lV-A-48/6No. rrn-ZltNo. IVR-9/ 1

0.400

0.450

0.450Unit-llMuseum Area

Unit-ll

Unit- ll

Unit-ll71

72 No. 2RB-S/S-7

73

ii 5/R to Qr. No. l|R-PF-7/5

S/R to Qr. No. VA-16/3

0.400

0.450Unit-ll 0.450

(2) (l) (4) (s)

75 S/R to Qr. No. 2RB-F-3/5 Katpana Area 0.350Unit-ll76 S/R to Qr. No. IVR-1/'l to 'l /4

77 S/R to Q.r. No. IVR-3/ 1 to 3/40.4500.400Unit-ll

unit-tt5/R to Qr. No. ll-9l3S/R to Qr. No. 2RA-43

80 S/R to Qr. No. IVA-3/481 S/R to 2RA-5/3

82 S/R to Q,r. No. llR-3/983 S/R to Qr. No. D-80

u S/R to Qr. No lR-1 1

78

7g Unit-llUnit-ll

Katpana Area

0.400- oJ-50

0.300o.3bo

0.3000.4000.400

osoo0.450

Unit-llzue A""iBJB Area

85 S/R to Qr. No lV-44l1 Unit-llUnit-ll. 86 5/R to Qr. No. llR-3/4_

87 Si R to Qr. No. VA-5/388 S/R to Qr. No. 3RF-1/2 Kalpana Area 0.400

U"it- ll O.4OO -

0.300Unit-ll

BJB Area

BJB Area 0.350

Unit-ll 0.450

89 S/R to Qr. No. Type-ll-3/690 Si R to Qr. No. IVR-12/291 S/R to Qr. No. ll-12l3 0.300

0.30092 S/R to Qr. No. D-25

93 ,S/R to Qr. No. D-49

94 S/R to Q.r. No. Vl-D/5-3/1 Unit-ll 0.45095 S/R to Qr. No. 3RF-4/4 Katpana Area 0.45096 5/R to Qr. No. VA-20/4 Unit-ll 0.40097 S/R to Q.r. No. IVR-17/7F Unit-ll 0.40098 S/R to Qr. No. VA-8/3, VA-4/3,VA-

30 / 4, tv A-47 I 5 & tY A-36 / 7

99 S/R to Qr. No. VA-2114, 913 and 311 Unit-ll 0.400

100 S/R to Qr. No. VA-1112 Unit-ll 0.450101

102 S/R to Qr. lfo. rVa-:O7O

5/R to Qr. No. IVA-41/43l3

Unit-ll 0.400

0.400

0.400

Unit-llunii-ii

S/R to Qrs. No.ll-4/4Sr R to Qrs. No.ll-2r+S/R to Qrs. No.F-7/5 8.F-9/1

106 S/R to Qrs. No.2RA-10/9

107 S/RtoQrs. No.ll-15/3

103

104

105

Unit-llUnrt-li

0.300

0. i00Museum Area 0.500Kalpana Area

Unit-ll0.400

o.4oo

E:\C.E (B)\SPR\2018-19\AMP 201&19\A.M.p_ 2O18-19-01 lc2018\A M.p.-Res.periodic-Res Pq-3/26

Unit-ll

g5'anle Oi iira

iR&BlDivjsjon\a i a; !, ': ,, ari f.S

Fea'- :, ea

(3) (4j1C8

109

110

111

112

II.)

114

1'15

116

117

118

s/i5/R

S/R

5/R

5/R

S/R

5/R

5/R

5/R

s/RS/R

S/R

toto

totototototototototo119

Q's. lJr.2RB-7r8

Qrs. No.2RB'7l10

Qrs. No.2RB (S/S)-11

Qrs. No.2RA-5

Qrs. No.ll-13/1

Qrs. No.llR (PF\-9/1

L.T Qrs. No. IVA- 1 4/ 1

Qrs. No.llR (PF)-8l3

Qr!, No.lVR-3/4

Qrs. No.lV-2l2

Qrs. No.llR-4/3qrs. No.tt-ar#f-f 9f9 V

l(al)arla 1i!a

Katt)ana Area

Museum Area

Jnit- ll

Unit- ll

Unit-lllJnit- ll

U nit- ll

lJnit- ll

Unit-lllJnit-llU nit- ll

ttnii-ttlJnit- ll

l..lnit- l I

{Jnit- ll

0. rl!0.100

0.400

0.400

0.400

0.400

0.400

0.300

0.300

0.400

o.:soo. soo

0.250

oJ000.400

0.500

0.400

120 5/R to L-T Qrs. No.lVA-'17/19l3

171 S/R to Qrs. No.llR (PF)-814

122 SIR to Qrs. No.lVR-21/3'123 S/R to Qrs. No.lVR-3/1

174 S/R to Qrs. N;.l1-5l1125 S/R

176 vRtzl stn128 5/R

tJnit- ll

Unit+tJnit- ll

tJnit- il

0.500

o.aoo

0.500

0Joo0J5o0.400

ars. \olln-2il t9l{2L.T Qrs. No.lVA-13/15/2

Qrs. No.ll-.1 1/1

Qrs. No.F-5l3 &.F-514

5/R to Qrs. No.2RA-17

S/R to Qrs. No.lVR-7/2

totototo

119'll0

Museum Area

tJnit- ll

tJnit-ll

131 S/R to Q.rs. No. F-3l2 Museum Area 0.350

132 S/R to 'F'type Btock Qrs. No.F-1l1 & F' Mussum Area

1t6133 S/R to Q.rs. No.ll-14l4

0.500

tJnit- ll

t.lnii-tt

t.tnit-it

0.500

134 S/R to Q.rs. No.ll-14l2 0.500

o.ioo135 S/R to Qrs. No.lVA-31/2

136 S/R to Qrs. No.lVR-14/1 tJnit- ll 0.500

0.400

osoo-137 S/R to Qrs. No.ZRA-7I11

138 5/R !o Qrs. No.2RB-7/4'139 S/R to Qrs. No.ll-14l6140 Si R to Qrs. No.lVA-33/2

141 Si R to Q.rs. No.ll-20/6

LJnit-ll 0.400

0.350

iJooL.lnit- ll

tJnit- ll

(1) \2) (s)

147 SIR to Q.rs. No.ll-20l5 l.tnit- ll

t,nit- ll

ttnit-it

0.400

0.350143 S/R to Qrs. No.llR (PF\-1114

144 SIR to Qrs. No. 2RPF-12/1 0.400'145 5/R rot+o sJn tolii sra,.

Qrs.

Qrs.

Qrs. No.-lVA-7l1

No .-wF -ZStq ;/

No.lVR-26/2 & 2RA-23

No. f Vn-al I

[,nit- ll 0.500

148 S/R to Qrs.

S, ii t,.-, Qr:.

t,nit-llUnit-ll[,nit- ll

.iiriL',iL nit- lllL nit- lllLnit-lil

0.500

0.350

oTooi. r Ott

0.400

Itu..i!n rS,- r//150 S/R to Qrs. No. IVB-39/4

S/R to L.T. Qrs. No. IVB-8/1'151

157 S/R to Qrs. No. IVB-52/3

E:\C.E.(B)\sPR\2o18 19\aMP 2a18-19\a.M.P -2018-19 01-10 2018\a.M.P.-Res.Periodtc-Bes

0.500

0.700

Pq 4/26

o

Katpana AreaI Kak,ana Arei

E:\C.E.(B)\SPR\2O18-19\aMP 2018-19\A.M.p.-2018.19-01-1C2O18\A.M.p.-Res.p;riodic-Res

Unit-lll 0.400

Pg_s26

t..ii;.:I|e (_,I i -

iP.cirJ ) D:ir15 ir.Si llame of the \^1or-Ks

5/P, tc new P\ryD Cotony Qrs, No

to1/1S/R to Qrs. No. IVB-17l1

5/R to Qrs. No. 1R-3, LabourCommissioner Staff quarterS/R to Qrs. No. ZAA-Z:

slCtoQrs. No tvB-48/1

Sln to Qrs. Uo.lt-t+;z

urlri l Area AmountRequired

0.500

0-600

0.400

0.600

o.aoo

o.+oo

o.+oo

l

II

t.lo

(1)

!-2./ 1 S: t1,ai'la ga r 0.400

154

155

156

157

Unit-lllUnit-lll

Unit-lllUnit-lliUnit-lllUnit-lliUnit-lll

158

159

160

S/R to M.T Quarter No.VR-1C/1

S/R to L.T Quarter No.Type.ll (12r r to1216) =1 Btock

S/R to L.T Quarter No.ll-21l1 to21/6=1 Block

161 Unit-lll 4.400

'162 Si R to L.T Quarter No.ll Block No.5 (ll- Unit-lll 0.3505i 1 to 5/6=1) Btock

163 S/R to L .T Quarter No.ll-20l1 to 20/6=1

Unit-lll 0.450

164 SlR to L.T Quarter No.ll-25l1155 S/R to L.T Quarter No.ll-15/6166 S/R to L.T Quarter No.ll-ZL/6 Unitftt 0.300167 SIR to L.T Quarter No.ll-20l2 Unit-lll 0.400168 S/R to L.T Quarter No.ll-26ll Unit-lll

Unit-lll0.350

169 S/R to L.T Quarter No.ll-15/1 0.350

170 S/R to L.T Quarter No.c-4 Unit-lll 0.300171 S/R to L.T Quarter No.ll-21 /3 Unit-lll

Unit-lll 0.300

r-rnii-rrr

-o.l5o

172 SIR to L.T Quarter No.ll-14l5 Unit-lll0.300

o4oo'173 S/R to L.T Quarter No.ll-19l5174 5lR to L.T Quarter No.ll-8/6 & 1/6175 S/R to L.T Quarter No.ll-2l5176 ,SlR to L.T Quarter No.ll-Z7 /4177 SIR to L.T Quarter No.G-11

178 S/R to L.T Quarter No.ll-7l2179 SIR to L.T Quarter No.2RB-14

180 S/R to L.T Quarter No.ll-916181 5/R to L.T Quarter No.ll-2512

il-- S/R to L.T Quarter No.ll-2616

Unit-lllUnitlll

o.M0.400

Unit-lll 0.300

0.300Unit-lllUnit-lllU"itf ll

0.250

0.300

Unit-lll 0.,100

Unit-lllanitLll

0.300

0.300

Unit-lll 0.500183 5/R to L.T Quarter No.ll-17l1

185 S/R to L.T Quarter No.ll-10/5186 S/R to L.T Quarters No.Type.ll Btock

No.4(ll-4/1 to 4/6\187 S/R to L.T Quarters No.Type.ll Btock

I'1u.2(il-2i 1 t,.:2i 6)-'il.i.r

Unit-lll 0.500

Unit-lll 0.500

Unit-lll 0.500

Unit^lll 0.450

Unit-lll 0.450

Unit-lll 0.,100

Unit-lll 0. s00

188 S/R to L.T Quarter No.2RB-16

189 S/R to L.T Quarter No.ll-17l3190 S/R to M.T Quarter No.VlB-2/2

(j ) (4) (s)

184 YR to, !r qygrtgfto.Ulg

: ci tneDivisi oi

:t Ui,,i ," -,i aa.

(4)

Reo.!j re !Ija

,)

191

194

195

196

197

198

S/R

s/RS/R

S/R

s/R

5/R

totototo

toto

0.300

0.400

0.500

0.500

0.500

o. soo

ai.qso

/q\

0.40!0.400

7.307

o.itto-o+o

191.

197

(,'P f^ | T e,'-.to, N^ ?PP-o

5/R to L.T Quarter No.2RB-1&2=1 Btock

L.lr.tit-ill

Ll nit- lll

tJnit-lll

Sal.yanagar

tJnit-lll.tnit-vl.Jnit-V

Unit-VTotal=

L.T Quarter No.ll-37l4

Qrs. No.S-5

L.T Quarter No. IVB-28/4

Qr. No.Type-ll-9,10,11, & 12

H.T.Qr, No.VlllMR-1

H.T.er. No.6R-1

ghuIencswar-llS/R to.....

1 YtA-117

z 1at-ttIJnit- 1

iJnit- 1

Unit- 13 tY-17 t2

4 wB-411 Unit-1 1.000

2.000

1.083

0.358

0360o.3ao

0.450

5 tvR-1 6/ 1 lJnit-1

Unit- 1

I.Jnii 1

U nit- 1

Unit-1

lJnit-1

6 |-19t1

7 l R-Z/5

8 ilR-1/4

9 ilR-5/1

10 |-4t 1

11 2RA-37 -11

tJnit- 1 1.000

0.300 -0.300

|-3t4|-2i3

Unit- 1

Unit-1

lJnit- 1 0.40014 |-7 t1

15 lRA-62 tJnit- 1 0.400

16 tY-27 /4 tJnit- 1 0.400

17 rV-15/4 tJnit- 1 0.400

18

1g

ilR-2/2 & ilR-2/3 tJnit-1 0.400

vtR-14 tJnit-6 0.856

70 vtMR-g tJnit-6 0.246

21 zRA-1(PWD) tJnit-7 0.706

22 F-23 tJnit-7 o.612

73 E-8 tJnit-7 0.400

24 F-41 tJnit-7 0.675

25 F-1 tJnit-7 0.716

16 F-12

tvR-40

ivR-r z:tvR-3r7

rvR-207

tvR-1 2

tvR- 1 3

0.428

o.itso. roo

0.209

0.362

osse

LJnit-7

tlnii-oLJnit{

0.400

27

29

30

31

37

tlnit-6

LJ nit-6

LJ nit-6

E:\C E.(B)\SpR\2018.lg\aUp tOtS rc\n.u.p.-t018-19 o1-1a-2018\a.M.P.-Res.Periodic-Res

L.,nit-6

Pq_6/26

E:\C.E.(B)\SPR\2018-19\AMP 2018 19\A.M.P 2o18 1s-o1.1o2018\A.M.p.-Res.periodx-Res Pq 7/26

r\ame or Ine(R&B ) Division

5t.

l.lo

l\ame oi ane vvorKs iJ ntt I Ar ea ArltoLt n iRequired Cry(7) (3 ) (4t (s)

Unit-Vlll 0.40

(1)

i334

35

36

37

rvR(PF)- 14

lvR-141

tvR-60

tvR-78

F-47

[R-11

ilR-i2a

G-11

Unit-6

Unit-6

Unit-6

Unit-6

Unit-6

Unit-6

Unit-O

0.400

0.400

0.400

0.400

0.400

0.772o.247

0.400

o. sZr

38

39

40

41

Unit-6

Unit-6

42 ilR(PF)-I3 Unit-6 0.57043 VR-34 Unit-6 0.72544 2RA-2(PWD) Unit-6 0.357

oAt45 lrR-2(PWD) Unit-6

46 tvR-230

IYR-71\./Unit-6 0.400

47 Unit-6 0.,1O0

48 IVR-294 Unit-6 0.400

Total= 26.20

Bhubaneswar-lllS/R to.....

i qtr. uo r-razo Rental Cotony 0.40

2 Qtr. No E-14l1 Renta[ Cotony

nentat Cotony

0.40

3 Qtr. No E-11l5 0.40

4 rQtr. No E-l1l2 Rental Col.ony 0.40

5 Qtr. No E-T-9/5 Rentat cotony 0.35

6 Qtr. No C-5- I rRc vitt"g" 0. s0

7 Qtr. No B-8 IRC Vittage 0.50

8 Qtr. No T-10/12 RentaI colony 0.30

9 Qtr. No T-1l4 Rental colony 0.35

10 Qtr. No F-7l10 RentaI cotony 0.35

11 Qtr. No F-5l2 RentaI colony 0.35

1Z Qtr. No F-4l8 Rental colony 0.35

13 Qtr. No F-260 IRC Vittage 0.35

14 lQtr. No F-26/12 RentaI cotony 0.35

15 Qtr. No F-161 IRC Vitlage 0.40

16 Qtr. No E-89 IRC Vittage 0.40

17 ,Qlt'Qtr.

No

No

E-50/7 Rental cotony 0.40

18

19

i-sro Rental colony 0.35

Qtr. No E-45 IRC Vittage 0.40

0.4020 Qtr. No E-39/4

21 Qtr. No 2RA-15/5

Rental cotony

Unit-Vlll t).4u

0;o22 Qtr. No 2R-28, Rd-A Unit-Vlll

23 Qtr. No 2RA-34, R-C

I iL.

t.10

^l ea A;i i!- _. L

Reo ui red

0. 40

0.40

0.40

0.30

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.40

,'l ,?iF.r l-tir,;<inn

t4)74

25

76

77

L6

79

30

3'1

32 No

No

Ofr l{,r

Qtr. No

Qtr. No

Qtr. No

Qtr. No

Qtr. No

Qtr. No

Qtr. No

Qtr.

Qtr.

34 Qtr. No

15 Qtr. No

1R-_16

1R-40

E-307

E-21

E-119

zat-+ots

7RA-41/7

7R -4/4

7RA-24/8

zaa-ztrlRA 72t8

zat-zzts

Lirrit-Vlll

LNIT-VIII

L NIT.VIII

UNIT-VIII

UNIT-VIII

UNIT.VIII

UNIT.VIII

uNtT-vilt

uNii-Vrrr

UNIT-VIII

UNIT.VIII

UNIT ViII

uuiir,rrrr

uNlr{/rIuNlr-viliUNIT-VIII

ur{lrwrr

33

37

36 Qtr.

Qtr.

Qtr.

Qtr.

No

No

No

zRA-17 t9

zm-rzlszwT,1

7RA-1/7

zna-r

D-8A

0.40

0.40

0.40

1a

39

40

41

Qtr

Qtr

No

No

No

No 2RA-11/1

42

43

44

45

Qtr.

Qtr. No 2RB-4/2

UNIT-VIII

uNtr.vltiUNIT.VIII

UNIT-VIi

0.50

0.40

Qtr. No D-6/1

Qtr. No C-14

0.50

0.80

46 Qtr. No

-c7 qir. tlo

c-13 UNIT-VIII 0.80

c-1 7 UNIT-VIII

UNIT-WI

0.80

48 Qtr. No C-1 8

49 Qtr. No B-8

50 Qtr. No 8-6

0.50

UNIT-VIII 0.50

UNIT-VIII 0.50

(3)(2)(1)

51 Qtr.

r ati.

A-1l5, N. k.Apartment uNtT-vlll 1.00No

tlo 5R-1 1.00

53 Qtr. No 4RF-1/l UNIT-VIII 1.00

54 Qtr. No 4R-7

55 Qtr. No 4R-14

56 Qtr. No 4R-13

57

58

Qtr. No 4R-11

UNIT.VIII 1.00

uNtT-vilt 1.00

UNIT-VIII 1.00

No 3R-2(PC)

E-41

UNIT-VIII

urlrrwrrurlrr.fl lr

uulr vrtr

L i\lT,\',ii,

uNhVilUNIT-VIII

uNri-vil

0.90

59

60

oi

62

o:64

Qtr.

Qtr. No

No

I'i,.-,

Qtr

Qir

Qtr. No

Qtr. No

qti. No

E-376

L ,Lr

E liar-ulE-172

0.50

0.3s

o.40

'.--o.40

0.40

o.4o

f:\C.E.(81\SPR\2118 19\AMP 2018-19\A.M P. 2018'1-o 01 1G2o18\a.M.P-'Res.Periodit'RPs Pq_8/26

A\(5)

UNIT-VIII

E:\C.8.(B)\SPR\2018-19\AMP 2018 19\A.M.P.-201&19-O1-1G2018\a.M.P.-Res.Pe odic-Res Ps 9/26

l'lame oT the(R&B) Division

5t

l.{o

l\ame oI irle vlorKS u ntr 1 Area AmountReouired w

@(1) (7) (3) (4) (5)

Unit-lX (F) 0.400

65

66

67

68

69

70

7Z

Qtr. No

Qtr. No

Qtr. No

Qtr. No

Qtr. No

c-31

zRA-36/4

2RA-33(Road-D)

ina-zs

2RA-23(Road-C)

UNIT.VIII

UNIT-VIII

UNIT-VIII

UNIT.VIII

UNIT-VIII

UNIT-VIII

uuir-Vrrr

UNIT.VIII

UNITryIII

UNIT-VIII

UNIT-VIII

ur.tnwirur.ilTryilt

Qtr. No

Qtr. t'to

Qtr. No

2RA- 19(Road-A)

2R-39(Road-41

0.35

0.35

0.35

0.35

0.35

o.Js

2R-20(Road-C) 0.3s

0.3573

74

Qtr. No 1R-36

Qtr. No F-217 0.3s

75 Qtr. No E-97 0.35

76 Qtr. No E-1/5 0.35

77 Qtr. No 2RA-73/3 0.35

78

79

Qtr. No E-70

qir.No i-i8iUNIT-VIII 0.40

UNIT.VIII

IRC Vit@e

0.30

80 Qtr. No F-37 0.30

81 st,rcli atr. No r-zas to E-zsl UNIT-VIII

Uf.lf f.Uf f l

1.75

i.oo82 Btock Qtr. No E-137 to E-142

Total= 39.00S/R to ....

Bhubaneswar-lv 1 D/S-4/4 MLA Cotony 4.458

2 F-16t2 MLA Cotony 4.581

3 3R-14/1 MLA Colony 4.075

4 F-6t7 MLA Colony 1.979

5 tvN-38 MLA Cotony 1.U1

6 DIS-1611 MLA Colony 1.751

7 3R-15/ 1 MLA Cotony 0.574

8 3R-10/2 MLA Colony 2.546

9 F-3t2 MLA Colony 1.130

10 tvN-25 Unit-lV 0.745

11 VN 55 Unit- IV 0.369

12 VN 56 0.4v7

13 VN 35 Unit-lV 2.954

14 VN.23 Unit-lV 0.501

15 tVN-30 Unit-lV 0.405

16 tVN-1 9 Unit-lV

Unit{V

Unft-X (F)

0.409

17 tVN-22 1.077

18

19

F-16/ 1

tvN-60 Unit-lV

0.585

0.400

20 2RB-59/10 Unit-lX (F) 0.500

21 ZRF-4/1

Unit-lV

l\a:l',: :i .,,irR&BiDjvisjo.

It an-re C, iL,a \\uiri5 AiTruLillt

ReoLrired

(s)

0.346

0.350

0.350

AF\--.'

lio

!,2)

22

23

74

th

77

78

79

30

31

37

JJ

34

t4)2P.F-5./ 1 2

2RF-5/ 1 1

2RF-5/ 13

E-67/1

4RF-25

F-8/3

3RF.14t2

zpr-s ttq4RF- 30

2RF 3/9

zar-s,1s

7RF-8i 4

zar-l n

ll,rit lY /tr\

Unit-lX (F)

Urrit- lX (F)

Unit-lX (F)

Urrit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

0.346

0.346

0.346

0.500

0.984

0.400

0.590

0.346

0.984

Unit-lX (F)

Unlt-rX tfl

35 2RF-8/3

36 4RF.4

Urrit-lX

urti-riuirit-rx

uirlt-tx

(F)

(F)

(F)

(F)

0.350

olsoi.gsq

0.349

0,349

37 ZRF-9/11

38 inr-arrs39 D-5 /3

Urit-lX

Urit-lX

UritlXurit-lx

40

41

(F)

(F)

(F)

(F)

zRF-5t21

ia'+rzo

0.597

o:so0.349

42

43

4RF-79 Unit-lX (F) 0.994

Unit-lx (F) 0.398E-16-13/ 4

44 4RF-21 Unit-lX (F)

unit-ti 111

0.994

o:so45 zRF-3t24

46 2RF-3/15 Unit-lx (F) 0.349

47 2RF-8/11 Unit-lx (F) 0.349

48 zRF-4t3 Unit-lx (F) 0.349

49 2RF-4t4 Unit-lX (F)

Unt-X (r)0.350

50 7RF-5t17 0.349

51 2RF-7t8 Unit-lX (F) 0.349

52 2RF-4t7 Unit-lx (F) 0.350

53 zRF-4/9

54 2RF-7t18

55 2RF-7/74

56 7RF-4/6

si zRF 7/i1s8 zai-t tM

.--.--

60 E-62ti

61 F-14/1

62 2RA33/3

Unit-lX (F) 0.350

Unit-lX (F)

Unit- lX

lnit-lXu"rix

0.350

0.350(F)

(Fi

(F)

0.349

o.:so

0.349.-..tJ. -lrl>

Unit-lX (F)

tjrrit-iX 1I1

Unit-lX (F)

Unit-lX (F)

Unrt-lx (Fi

0.399

0.400

0.349

t:\C.E.(B)\sPR\2o18 1g\aMP 2018-1s\A M.P.-2ata rc ot n zon\a u.p Res.Periodic-Res Ps_1o/26

,isior,)r. r\alle oi ti.'re vr oTKS Unrr / Area An'iou ir t

Reouired

0.596

0.349

0.349

0.399

0.399

0.350

0.350

0.348

0.448

0.400

0.462

0.394

evNo

(7t

64 F-16/3

65 7RA-40t1

66 2RB-55t12

6z iCa-szno

68 F-19/4

69 rRA-11t3

70 2RA.28t1

71 2RA-26/ 1

72 2RA-16/5

Unit- iX (F)

Unit'lX (F)

Unit-lX (F)

Unit-lX (F)

unit-ti 111

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lX (F)

Unit-lx (RZ)

Unit-lx (RZ)

73 2RA-32-Rd-3

74 2RB-113--Rd-1

(3 ) (4) (s)

75 2RA-89--Rd-5

76 2RB-24--Rd-7

Unit-lx (RZ) 0.395

77 2RA-65 to 75--Rd-6

78 2RA-49 to 5l--Rd-1

79 2RA-22 to 24--Rd-5

80 2RA-91--Rd-2

81 2RA-48--Rd-5

82 zRA-101--Rd-7

Unit-lX (RZ) 0.396

Unit-lX (RZ)

Unit-ix (Rz)

Unit-lX (RZ)

0.487

o.495

0.493

Unit-lx (RZ) 0.495

Unit-lX (RZ) 0.346

Unit-lx (RZ) 0.345

83 2RA-98 -Rd-3 Unit-lx (RZ) 0.349

84 2RA-65-R-4 & 2RA-79-R-4

85 2RA-5-R-3

86 2RA-48-R-2

Unit-lX (RZ)

unit-riiRz)

Unit-lx (RZ) 0.400

Unit-lx (Rz) 0.360

0.500

0.349

87 tR-40-R-3

88 2RA-58-R-7

89 2RB-1 -R-6

Unit-lx (RZ) 0.348

Unit-lx (RZ) 0.400

Unit-lx (RZ) 0.350

Unit-lX (RZ) 0.351

90 2RA-78-R-8

91 2RB-125-R-1

92 2RB-41 -R-5 Unit-lx (RZ) 0.587

93 2RB-4-R-7,2R8-31-R-5,2R8-2/6-R-7 Unit-lX (RZ) 0.421

94 2RA-18-R-5 Unit-lx (RZ) 0.62595 2RB-28-R-2 Unit-lX (RZ)

unit-ri (Rz)

Unit-lX (RZ)

Lrnir-tx (Rz)

0.400

96 2RA-125 to 2RA-131-R-8

0 50,1

99 4R-3-R-6 Unit-lx (RZ) 0.794

100 2rB l3l.I1 Unit-lx (RZ) O.4O4

101 tR=62-R-6

97 2RA-92-R-6

1.000

0.350oq

? RA.30.R,l

)18 19V.M.P. 2018 19 01 1G2018V.M.P.-Res.periodic-Res

Unit-lX (RZ) 0.378

Pq_l1/26

,,7) (3)(1)

rrarrre of ti-re Vior ^5

rR&P.)t D,r,tsjo:, llo

\4)5a'-jt Schooi

V;S Nagar

CHC

Unit-lX(RZ)

Unit-lX (RZ)

Urrit-lX (F)

Total=aaramundJ

area

a;iimundJarea

aarimunda -area

Baramundaarea

Baramundaarea

Baramundaa rea

Recu;reo

(5)

0 .793

0.350

1 .000

0.400

1 .585

2.308

72.471

0.30

g'02

103

104

105

106

107

1R-9 and 1e.-15 sainik Schoot

2RA-6 VSS

Const Of commom boundray wall QtrNo.VlR-1/1 CHC

2RB-48/2, Rd-5

rR,60-R-6

S/R to F-Type Quarters at Unit-lX (F),

BBSR (such as supptying of Sa[ wood

choukaths & piasal wood panel shutter)

Bhubaneswar-V 1 E-3

z E-4 30

0.30

Baramunda 0.30area

0.

3 E-22 0.30

4 E-23

5 E-24

6 E-76 0.30

0.307 E-77

8 E-28 Baramundaarea

0.30

9 E-29 Baramundaarea

0.30

10 E-30 Baramundaarea

0.30

0.3011 E-31 Baramundaarea

12 E-37 Ba'amunda 0.30area

Ba'amunda 0.30a rea

Ba'amundaarea

0.30

Ba -amunda 0.30area

Baramunda 0.30

L

13 E-33

14 E-35

15 E-37

16 E-38

17 E-39 Ba -amunda

area

E:\C.E.(B)\SqR\2018 19\AMP 2018.19\a M.P.-2018-19-01-10 2018\A M.P -Res.Periodic Res

0.30

Pq_12/26

Name of the(R&B ) Division

(1)

5t.

No

(2)

&

1Q E ,'

19 E-54

70 F-3

21 F-6

27 F.8

Baramunda

aTea

Baramunda

area

BaramunJia rea

Baramundaarea

Baramunda

area

0.30

0.30

0.30

0.l0

0.30

23 F.9 Baramunda

area0.30

24 F-10 Baramunda

area0.30

75 F-13 Baramunda

area76 F-15

0.10

0.30Baramundaarea

77 F.17 Baramundaarea

0.30

Name of the Works Unit / Area AmountRequired

(l) (41 (s)

28 F-18 Baramundaarea

0.30

79 F-70 Baramundaarea

0.30

Total = B.7OS/R to.....

Cuttack-l 1 Behera line staff Qr No.A-10, SCBMCH,Cuttack

0.68

2 V.S. Q.r. insideBuxibazar

Veterinary Hospitat, 4.73

3 Qr. No.NRS-l near YMCA,. Cuttack

4 Qr. No.NRS-2A near YMCA, Cuttack

1.71

0.76

0.445 iG type Qr. near Canal side, SCBMCH,iCuttack (chajja grading, outsideptastering & weather coat painting)

6 3R Ftat Qr inside SCBMCH,(Ptastering, weather coat, S.EGritt fixing)

Cuttack. paint,

1.59

7 Main compound watl near Behera [ine,SCBMCH, CUttacK

8

0.66

0.70Qr. No.B/8, B/9 & BtlO in Behera [ine,SCBMCH, Ctc (Grading concrete, floortite)

9 PWD Staff Qr. inside Kitlafort, Cuttack(RCC drain)

E \C.E.(E)\5PR\2018 19\AMP 201S 1g\A_M.p.-2OjB-19 24.07.2018 CD\a.M p..Res.pe.iadi. Res

2.3 5

Pq_i3,/27

iSi f'i arie of rie lr'crK5 Area ; f:iO L1n i

Reoriredl.aina 3I ine

rRL3,: Dtrrstor

\4) 5())

10 Beher-a liiie stafi Qr (D Bicck) in

SC 8MC H. C trttack (Brick masonn' vtork)

11 3R Ftat Qr. No.1 & 2 inside SCBMCH,

Cuttack (Raisinq of garage & fixtng

chequered tite)

12 Qr no.CB-6 in Btock No.3, Cantonment,

Cuttack (Brick work, RWP)

13 D type Ftat Qys in Ambatota Cotony,

BOSE Campus, Cuttack

14 E type & F type Ftat Qr. in New

Ambatota CotonY, BOSE CamPUs, Ctc

15 Qr. No.OFS-7IZ occuPied bY C.M.

Routray, Dy. Fire Officer), R.P. Line,

Ctc

Qr. No.OSC-2 near YMCA occuPied bY

Nabin Motranty

Behera line Staff Qr, I Btock SCBMCH,

Cuttack (Tarfetting)

18 G type Qr No.G'2l2 &G-7/4 near

Canat side, SCBMCH, Ctc (Ftoor tite,watt tile, distemPering)

19 Qr.No.Vl/9 inOtd Ambotota Cotony

BOSE Cuttck(Repair to out house, ftoortile,painting etc.

11

1 .79

1 .56

1 .18

0.44

0.40

lb

17

1.28

0.67

0.65

1.69

70 Qr. No. D/4 in Otd Ambotota Cotony

BOSE Cuttck(, ftoor tile, distemperingpainting etc.

0.99

71 C.Tax Cotony, Tulasipur (Btock-C) 3.00

7? Otd Revenue CotonY, Gorakabar Qr.

No.2RB- Btock-E- 1 No.E/1 - E/6

(Outside painting)

1 .50

23 New Revenue Cotony, TV Centre,

Cuttack Qr. No.Btock-A, E type No.E/'1

to E/6 (Outside Painting)

2.00

74 New Revenue CotonY, TV Centre,

Cuttack Qr. No.B[ock-8, E type No.E/'1

to E/6 (Outside Painting)

75 New Revenue Cotony, ry Centre,

Cuttack (RePair of Btock'8, Qr. No.E/1

76 New Revenue ColonY, TV Centre,

Cuttack Qr. No.Block-J, E type No.E/1

to E/2 (Outside Painting)

7.00

1 .50

t a.E,J: J,..f-,rjj i,.l;r'yr;.-cre l-olI I t 2c,3-1,a 2: c7 2C18 CD'\A M P Res Deriodtc Res

1 .50

Pq 14/27

(3)(1)

(1) (7) (3) (4) (s)

r\drlle oI tne(R&B) Divi sion

st.

No-Name of the Works

Qr. No.S.O -1, KVK Road, C uttack

Unr t / Area AmouniRequired

2.50

1.00

0.50

0.50

0.5-0

0.50

0.50

0.50

0.50

0.50

1.00

G27

28

29

30

31

iz

OED Qr

clD Qr-

OiD Qr.

No.1, KittafortI; -, I rjl!,i---

No. J. Kr itaiortNo.4. f:ltaior.

33

34

CID Qr. No.5, KjttaicriOLD Qr. No.6, Kiita fort

3qa' No.l inside Kittafort , CtC35 2RB Qr No.I inside Kittafort , crc36 -r emp Sheci Qr. No.l, KiLtafort , ctc37 Temp Shed er. No.15, Kittafort, Ctc

Totat = 45.00S/R to.....

Cuttack-ll i Renovation of Tempshed No-1 inside 1.50Otd LIC Cotony, Badambadi, Cuttackfor the year 1g-19 such as raising of,ftoor surface and reptacement of AC

lSheet of roof.

2 SR to OGP StaffCuttack Type-Vl2018-19.

Qtrs at Madhupatna,2 nos. for the year

2.00

3 SR to OGP Staff eCuttack Type-V 52018-19.

trs at Madhupatna,nos, for the year

2.O0

4 SR

Cut201

to OGP Staff etrs at tvtitnupatna,tack Type-lV 10 nos. for the year8- 19.

1.00

5 SR to OGP StaffCuttack D-type 4

,19.

Qtrs at Madhupatna,nos. for the year 201g

1.00

6 to OGP Staff etrsrSR

Cuttack E-type 12 nos.2018-19.

at Nuapada,lfor the year

1.00

7 SRto OGP Staff etrsrCuttack F-type 16 nos2018-19.

at Nuapada,for the year

7.00

SR to OG

Cuttack Ty2018-19.

P Staff Qtrspe -ll 20 nos

at Nuapada,. for the year

2.00

Staff Qtrs at Khapuria,Cuttack for the year 201g_19

S/R to. .. . .Kendrapara 1 4nos D type & 4nos 'E" type Staff

(New) at Kendrapara7 Pharmasist qrs. at Kendrapara

9 SR to DtC1 .50

Total = 14.00

1 .00st!

\c.E (8)\spR\20J8-1g\AMp 2018 1g\A.M p 2018 19-24 07 2018 co\A.M.p Res.peiodt( Res

1 .00

Pq_15/27

si.

f'lc

liame of !fie vv orKS

(4)

AMOUI]L

Req ui re d

(s)9i\ama ci the

rRi: B t Divisio;r

JagatsinghPur

(2)

I Staff nu rses qrs (Tvvin) at KenC raPara

4 Medicat qrs. at KendraPara

5 Asst. Surgeon qrs.at KendraPara

6 Lady Asst.Surgeon qrs at

D.H.H.KendraPara

0.50

1.00

0 -50

Total= 5.00

5.00

Totat= 5.00

S/R to.. . ..

itaff quarter of (R& B)division office'

JagatsinghPur

S/R to.....

Panikoiti 1 PWD SDO and Staff Qrs at JajPUr 2.00

0.s02 Renov ation of GED Staf Qr. At Jajpur

Totat= 2.50

Dhenkanal

S/R to.. ...S/R to Setttement Qrs' No

RS/31 at Dhenkanat.

z sli to iottector Res at Dhenkanal

internal painting fixing of sunshade

RS/25 and 7.47

4.80

0.78

Tota[= 8.00

3 5/R to Home deparment staff Qrs. No

HP/55 to HP/56 at R.P. Line,

DhenkanaL.

S/R to.....1.00

AnguI 5/R to Revenue staff qrs 'E' type at

IDCO chhak, Angut

7 5/ R to Revenue staff qrs 'F type at 1.00

IDCO chhak, Angut1 .503 Staff q rs. of NKC C.T.E., Angut

S/R to Vigitance staff qrs (C-type 2 0.504

nos. E'type 2 nos. and F-type 8 nos )1.00

Nurse Qr. 2 nos SDH at Athmattik50.50

6 Revenue Qr. No-17 at Athmattik

7 2 Nos F-TYPe Qr (LDC) Athmattik 0.50

1.008 S/R to Veterinary Staff Quarters at

Charbatia

PatIahara

S/R to.....1 Asst. Executive Engineer Qtr' at

Athagarh

2 4 nos agricutture staff quarter at

Athagarh

Totat= 7.00

2.00

1.00

Totat = 1.00

a \a5.lB)\5PR12018 19\AMP 2O)3 i9V M e :013 19 24 01 2019 C?\l M P Rz\ Deqadic RP\P9_16/27

1

1

Name of the(R&B ) Division

st.

No

Name of the Works

(l)S/R to.....Additionat. S.P (r/iei{ance) Qrs atBerhampur

Berhampur

Staff Qrs El74 & El11 at AnkutiBerhampur

4 Tahasitdar Qr at Digapahandi

5 Staff Qr 4Rl9 of MKCG MC&H at BAM

U nit / Area AmountRequrred

200

2.00

2.00

@(1)

Gan jam-l

2 Judicjat Cotony Qr No.351 A 3/4 at

3

2.00

2.00

6 R.D.C Staff Residence, Berhampur 2.007 R.H.S. Staff quarter,at Ankutti,

Berhampur1.00

8 L.l.C. Staff quarter, at Komapatti,Berhampur

7.00

9 Textite Office watcer shed quarter,atBerhampur

7.00

10 UCP Engg. Schoot, Berhampur Principatquarter

2.O0

Total = 19.00

(2) (41 (s)

Ganjam-ll 1

S/R to.....E type qrs 4 nos &'F type 4 nos qrs atChatrapur.

3.00

7 4 nos of 2RB qrs. Of Girs High School atChatrapur.

7.00

3 Taasitdar &Kodata

Addt.Tahasildar qr at 7.00

4 6 nos Cterk & 6 nos peon qrs at Kodata 2.00

5 Tahasitdar qrs at Ganjam. 4.00

Bhanjanagar5/R to.....Staff quarters at L.l.C. Colony atBhanjanagarBtocki&ll

Total= : 1 3.O0

2. s0

2 S/R to Sub-Register Quarter at Sorada.

S/R to. .. ..

1 .50

Total= 4.00

Phulbani 1 S/R to Res buitding such as repair toTreasury cotony,Phulbani.

0.94

7 S/R to Res buitding such as repair toQtr Treasury road Phutbani.

Si R to Res buitding ru.ii * ,"pu,, toQtr No. 14,7,15 Treasury cotonyPhulbani

1.06

t \C E.(8)\SPR\2013-19\AMP 2A78 La\A.M.p.-2A18-19 24 07-2018 CD\A_N1.p Res periadicRes

0. E9

Pq 17/27

tr liame Oi i ireiRaE r Divi s i.,c

SI,

l.ia

Name of the viorks i.. i,tt Area

(4)

AmOLlnt

Reo,rir eC

(s)l7) (l)S/R ic R.es building such as repair to

Qtr l'lo. 1710. 19 t\29t2 at Nadikhandi

sahi Phu lbani

S/R to Res buitding such as rePair to

Qtr No. 37 & 38 at Nadikhandi sahj

Phutbani

S/R to Res buitding such as repair to

Qtr No. 4,5 & 6 at Treasury cotony

Phutbani

S/R to Res buitding such as repair toNGO Qtr No. 10 to 14 at Phutbani.

l

5

7

0..1c

0.50

6 0.97

0.29

Total= 5.00

S/R to. ....Boudh D Type Auarter for Govt Girts High

School

1.00

2 Twin Teachers Qtr. (Sri E. Pradhan &

Sri B. k Kheti)

1.00

3 Education Staff Qtrs. Near Hanuman

Tampte

4 2 Nos Horticutture Staff Qtr Boudh

1.00

0- s0

5 6 Nos Agricutture Staff Qtr Boudh

6 Asst.Director Hortictture Qtr Boudh

0.50-o.io

o. sti7 C.D.M.O.Qtr Boudh

Total= 5.00

S/R to.....Baliguda S/R to ARCS Staff Qr. such as Washing

& Painting, Repair to Door & Window

and Leak proff at Battiguda.

7.OO

7 Revenue Qr No. 155 Occupied by Asst.

Cottector at Battiguda

1.00

3 Wetfare Officer Qtr. At Battiguda. 1.00

4 PWD Meniat Staff Qtr. 8 Nos. AtBattiguda

1.00

5 Revenue quarter'E type 2 nos near RD

Office.

1.00

Total= 6.00

Koraput 1

2

3

4

S/R to... ..Repair to PWD D. E.E's Residence

Repair to 1 no. RTO Qtr. At Koraput

ReDair to PWD Qtr. no-t to iRepair to 4 nos. "E' type Qtrs. Of

Mining dept. at Koraput

s Cepiir- to 6 nos. "F' type Qtr. Of Mining

Dept.

2.00

2.00

2.00

2.00

. a:,.':r;SA! :a18 19\!MF 211ts :9\a tt4 D 2O1-1 19 2: Aa 2OIE CC A' tP i"s per;cdtc Pcs

2.00

P9 18/27

L(1)

1

Name of the(R&B ) Division

5t

No.(g

(1)

6

7

Repair to Qr. no 2R 35i4, jl i1 ai AEF

Cotony, sunabeda

Reparr to DNK staff Qr. no. DRBA 1 &6 (6 nos. ) at Koraput

ADtvt Residence at Koraput.

S/R to.. . ..S/R to (R&B) Stuff qru.ter, (OlS ffatNo-4) near Division Office at Jeypore.

S/R to (R&B) Staff Quarters (Occupiedby Sri Satyanarayan) near DivisionOffice at Jeypore.

2.00

7.00

Total = 14.OO

2.00

8

Jeypore

7 7.00

Amoun tRequired

Name of the Works Unit / Area

()) (3) (4) /5\

3 S/R to Vigitance 3 Nos. E-Type etrs atJeypore.

1.00

4 Revenue staff Quarters at Kotpad 2.00Totat = 7.OO

5/R to.... .

Nawarangpur 1 Veterinary Staff Quarter atNabarangpur

1.00

2 Cotlector Res at Nabarangpur 3.00Total = 5.00

S/R to.....Malkangiri Revenue Deptt staff euarters at

lvtatkangiri1.00

2 PWD staff Quarters at Matkangiri 1.003 Agriculture Deptt Staff ers at

Matkangiri1.00

4 Soit Conservation staffMatkangiri

Q,rs at 2.00

5 Ptanning staff Qrs at Matkangiri 1.00Total = 6.00

S/R to.....Rayagada-l 1 lslR to Res of Cotlector, Rayagada

Repair to res of Sub Cottector Rayagada22.00

1.00

3 5/R to Soit Conservation Staff qtr atRayagada

0.50

4 S/R to 4 nos Peon Quarter at Rattisahi.

0.50

Total = 4.OO

Rayagada-llS/R to. ....2 nos Vetenary Staif Qr at Gunupur 2.00

7 6 Nos Revenue staff Qr near otdTahasil office at gunupur

2.00

f:\C E.(8)\SPR\,2O18 1-a\AMP 2013 1,o\A i4.p 2Afif 24-072o1BCD\aMp Res petiodit.fres

Total= 4.oo

Pq i9/27

1

fu.n4-a'

I

l','

Name oi inetR&Br Divr st o'

Sambalpur-l

5t

l.l':r

(2)

ilame of tne Works U.II AIEA AMCUNI

Reo ur red

(l) (4) (s)

2.00

2.00

Para!akhemttndi

S/R tc. .. ..

Renair 11 Maintenance to Residence of

Dist. J udge at Pkd.

Repair & Maintenance to Staffquarters of Vigilence Deptt.

S/R to. . ...slR to Qtr No. 2RA-48 at Llc -otony,

Motijharan, Sambatpur Occupied by Sri

S.Das (Vigitance Dept.) for the year

7017 -18.

2 S/R to Qtr No. 2RA-46 at LIC CotonY,

Motijharan, SambalPur for the Year2017 -18.

Repair & Renovation of Staff Qtr No

Bl14 at PWD CotonY Brooks Hi[[,

Sambalpur for the year 2O17-18.

(Occupied by Sri Panchanan Behera, Jr.

Cterk-O/o SENC (ReB) SambatPur)

5/R to Qtr No '2RA-71 at LIC Cotony,

Sambatpur for 2017'18.

Renovation of Govt. Qtr No. 2RB/3 ofC.T. Deptt. at LIC Co[onY near

Women's Cottege, Samba[Pur.

100

7

Total= ].00

3

3.00

0.99

2.00

3.00

00

4

6 Repair & Renovation of the

Government Staff Quarter No-3RA/ 10

for the year 7017 -18.

7 S/R such as Concrete path towards'D'type Qtrs of P.M. Training Co[tage atLIC Cotony, Motijharan, Sambatpur for

7017-18.

3.00

8 S/R such as Concrete Path towards 'E'

type Quarters of P.M Training Coltege

at LIC Cotony, Motijharan, Sambatpur

for 2017 -18.

Soit lnvestigation work for Construction

of Proposed Staff Quarters for l.T.l at

Raqsanpur, 5amba[pur.

9

2.00

1.00

Total = 17 .99

Pq 2A/27

Si R. to.....

: a: ,irtj!. .-rl.! :a")ur )a1:|1 1t)\t ^1

? 2o1l 19 21.A7 2A13 CD\! t''/ P q?t Pe.oCt. RP\

I

Name of the Works Unit / Area5t

NoAmount

Required(7) (3) (4) (s)

Name of the(R&B) Division w

(1)

Sambalpur-ll S/R tc Resjdentiat Buitding such aspainting to G-type, E.type & F-tvpe qrsat LIC CoLony of VSS IMSAR, Burta

5/R to Residential Buitding such as

repair and renovation to quarter no.2RA-8 & 2RB-8 of VSS tMSAR, Burta

5/R to A.C.S.Q qtr at kuchinda nearbtock cotony

S/R to.. .. .

J. O,Z

2 4.39

7.99

Total = 11.OO

Deogarh Repair & Renovation S.p. Resident atDeogarh

2.00

2 Repair & Renovation RBD High SchootTeacher quarter at Deogarh

1 .00

3 Repair & Renovat'ion Girts high schoothead master quarter.at Deogarh

1.00

4 Repair & Renovation Revenuequarter at Deogarh

staff 1.00

5 New Cottector Residence at Deogarh 1.006 Thasitdar Residence quater at Deogarh 1.00

7 6Nos "F' type Q.r of Revenu Depart- -_-

- - 1 . O0ment at Deogarh

8 V.S.S qrs. of at Deogarh 1.00Total= 9.00

5/R to.....Jharsuguda 1 DLO Qrs.Jharsuguda 1.00

2 Peon Qrs Labour office, Jharsuguda 0.502.OO'l .00

3 Staff Qrs Agriculture, Jharsuguda4 l3Nos. Qrs G

Jharsugudaovt. Gir[ High Schoot

5 Qrs of Work Department atiJharsuguda

1.50

1.006 Assistant Labour Officer ers atJharsuguda

Total = 7.OOS/R to.....

Baragarh 1 S/R to S.P. Res. at Bargarh. 1 .002 S/R to Tahasitdar etr. 2.003

4

S/R to G type 8nos. Ftat qtr. Of HeatthDept. at Attabira

S/R to 2Nos. 3R qtr for Medicat officerat Attbaira.

2.00

E:\C E lB)\SpR\2018.19\AMp 2018-19\A.M.p -2OtE 19 24 A7_2018 CD\,A.M p. Bes.pe.todic Res

1 .00

Pq 2i/27

1

K<-,' _)

ilame,li the(R&e) Dr!'isi or

Bolangir

Si i.tame oi i56 Viorks Ur'rt Area

(4)

Amou;l iReouired

(s)ljO

(2)

Sl R to Sub Coltector quarter at

Padampur

S/R to.....1 CommerciaI tax staff Qtrs,Batangir

2 Aqricuttural Staff Qtrs 6, Nos,Balangir

3 Horticutture staff Qtrs ,Batangir 5 Nos

,Batangir

4 lTl staff Qtrs 3 Nos,Batangir

2.00

Total= 8.00

1.00

1 .00

1.00

5 DIC Staff Qtrs, Balangir

1.00

0.50

6 5/R to Geology Department quarter 0.50

7 'lR

to Mining Department quarter 0.50

8 Repair and Renovation of CDMO, ADMO

Office at Sonepur

0.50

9 Rl Office at Sonepur 0.50

0i010 Patient Ward / OT at CHC, SonePur

Kantabanji

S/R to.....4 nos LDC Quarter foa;Gff otsubcottector at Patnagarh

Total= 7.00

1 .00

2 2 nos Twin Amin Quarter at Patnagarh 2.00

3 4 nos Peon Quarter at Patnagarh

4 Tahasit C[erk Quarter at Patnagarh

1.00

Total=1 .00

s.0o

S/R to. ....Vigitance DePartment Quarter atsonepur

1.00Sonepur

Z CDMO & ADMO Quarter at Sonepur 1.00

3 4 Nos PWD Staffs quarter of PWD Officepremises at SonePUr

0.50

4 Sub-Cottector Res at SonePur 1.00

5 5 Nos. E Type quarter near Tahasi[

Office at Sonepr

1.00

6 2 Nos. E Type quarter of Revenue

Quarter ner Btock Colony at SonePr

1.00

7 Rl Quarter at Binka

S/R to.....1 TahasitdarResidenceBha;anipatna

Repalr to Sub Register Quarter atBhawanipatna

El to Collector Res Office

Total=

1 .50

7.OO

Kalahandi 1 .50

1.502

3 1.00

Pg_22/2)aia..:1-9 jirs:rri-i: j1f zClEMA\"1 P 2i)18 1921 C,- )015 aD'.At\1 P Res.Penodic-Res

Name of the(R&B) Divisi on

AmountRequt'red

Name of the Vy'orks Unit / AreaSI

l'lo

(7) (3) (4) (s)4 Repair to Govt GNM Ladies Hostel at

Kamthana in Kataha ndi

5/R to SDIPRO Staff quarter atthawanipatna

S/R to... ..S/R to Revenue staff Qtr.N;.15,17 & 1S

at Nuapada.

S/R to Cotlector Res.Qtr.t'lo. t atNuapada.

3 .00

2.00

Total = 10.00

1.00Khariar

5

1

7

3

0.50

Periodical Renewal to staff Qtr.zRB ofAgriculture Deptt. at Khariar.

0.50

4 P/R to V.A.W.Qtr.at Nuapada 1.005 P/R to SNos. Ftype Qtr.of l. T. C. at

Khariar Road.

1.00

6 P/R to Office-cum-Residence of Exciselnspector, Nuapada.

1.00

7 P/R to Cterk Qtr.of raja A.T.HighSchool at Khariar.

1.00

Total= 6.00S/R to... ..

Balasore-l Repair to 5 Nos "F'Type Quarter('lNo) at Rajabagicha Balasore (Such

as Dismamteting A.C. Sheet Fixing ofA.C.Sheet Raising Brich Work )

1.00

2 Repair to 6 U.D.C. Quarter No-'l near(R&B) Division Office at Batasore suchas Transporti ng of debrise

0.10

3 Repair and Renovation "D" typeQuarter Rajabagicha Balasore ( NearEmptoment Exchange Office)

0.50

0. s04 Repair and Renovation to Quarter No

E-1 Occupied by Sitaram Nayak at l.T.lCotony Batasore

5 Repair and Renovation to 2 Nos Highertype quarters(1 No) near DivisionOffice Batasore for 2018-19 NowOccupied by Sri L.K. Barrk Sr. CterkDivi:ion-ll

0.50

w

E \CEr,9)\SpF\2018 i9\Ar'lp 2O1a-B'\A M p 2A18 19 21 07 2A18-CD\a_M.F. Fe!.pexadit Res Pq 23/a7

(1)

1

x6, J,.

(1) (7) (3)

iiame ol r i',e

rR&B ) Dr',.rsic,r i'i.

5

11Jilr3 oi iae r"cr ks iiit:i ,irea AmoLln r

Req ulreC

(5)(4)

Repair anci Renovation tc VAS Quarierat Nilqjri sLrch as

P laster, Roof. Watt, Colour Door &Window Damaged etc.

Repair and Renovation to Revenue

Officer Quarter near Post Office atNitgi ri such as Ptaster, Roof, Wat[, ColourDoor & Window Damaged etc.

0. 50

7 0.50

1.008 Repair and Renovation to Revenue

Quarter for 2014-15

at Nilgiri such as

Ptaster, Roof , Watt, Cotour Door &Window Damaged etc.

9 Repair and Renovation to D-Type

quarter for Tahas'ildar at Nitgiri such as

Ptaster, Roof, Watt, Cotour Door &Window Damaged etc.

1.00

0.4010 Repair and Renovation to Sub-CollectorResidence at Nitgiri. such as

Ptaster, Roof ,WaIt, Cotour Door &Window Damaged etc.

11 Repair and Renovation to F Typequarter at Sub-Treasury Office at 5oro

such as Ptaster, Roof, Watt, CotourDoor & Window Damaged etc.

0.50

Total= 6.50S/R to.....

Balasore-ll 9 Nos "E" type Quarter of G.K. BhattarHaspitat at Jateswar

2.00

7 R/R to D.P.O. qr (Btock colony)atBatasore

1.00

3 R/R to lR qr for Labour office Staff atBatasore

2.00

4 R/R to 6 nos F type Qtrs. At DHH

Balasore

S/R to.....oocrr;ns Qns + Nosar aHaDRAta

SUB.TREASURY OFFICER QR.

CASUD[\'P LiR,

sln ro rniasuni sraribnsDHAMNAGAR

SU B- RF SISTTR QR. AT BASUDEVPUR

2.00

Total= 7 .OO

0.50

0.50

0.50

Bhadrak7 AT

3

4

F aateiSPq,)C18 19\AMP2A1E 1,o\AI\'.P.2C15 19 2:-A/- 2018 CD\.: tt: ' qe. Pc:tadr Res

0.50

Pq 2a/27

1

E:\C.E.(B)\Sp8\2018 La\At\,1p 2018 19\,A.tv1.p,2Ai8 19 2t 07 2018 CD\A.M.p Res_perjodtc Res Pg 25/26

p$wl..lame of the

(R&B) DivisionName of the WorksSI

No-

AmountRequired

Unit / Area

(1) (7) (3) (4t (5)5 D'TYPE QRs. OF AGRICULTURE DEPTT 0.50

6 Twin 'D' TYPE QRs. OF AGRICULTURE

DEPTT.

0.50

Total= 3.00S/R to.....

Mayurbhanj I 8nos E'Type qtr of Revenue

Department, Baripada7.OO

2 D'Type qtr. At DIET Baripada 1 .00J Revenue staff qtr. Near Mining Cotony

Baripada1.00

4 Two nos of'E'Type qtr of GED atPatbani Baripada

1.00

5 ,Mining Colony office staff qtr.no. 3,4,5at Baripada

1.00

6 S.l. of Schools qtr. At Gopatbag

, Baripada1.00

7 tTnos'F type qtr. At LIC Cotony Baripada 1.008 Staff qtr. For MPC Junior Coltege 1.009 2RA qtr. At Gopalbag, Baripada 1.0010 Lecturer qtr. lnfront of 5P Qtr. At Baripada 1.00

Total= 11.00S/R to.....

Rairangpur 5 Nos F type staff Q.rs of Govt- Boys

High School, Rairangpur2.50

2 SDMO Qr. Of SDH at Karanjia 1 .50

Keonjhar 7.OO

2.00

1.00

Ghatagaon

7

6

Repair Treasury Officer Qrs at Park Line,

Total= I 4.OO

1.00

1.00

1.00

Totat= 8.00

1 .002 R/R to Tahasitdar Quarter at Ghasipura 2.00

:staff at Park Line, Keon jhar

'Keonjhar

5 Repair to Ptanning Officer Qr 1 No. 'D'

type Qr at Otd Town, Keonjhar.

Repair to A.D.M.O. (PH) Qr at DHH,

Keonjhar.

3 rRepair to Twin E fype Qrs for Treasury

4 Repair to 2 Nos. 'F type Qf for TreasuryStaff at Park Line, Keonjhar.

5/R to.....Repair to Otd S.P. Qrs occupied by Sub-

iCottector at Jait Road, Keonjhar.

S/R to... . .

R/R to R.H.5 quarters it cniiipuril5tos I1

A l,l arre -li a ile(R&B ) trivtsioir

5u ndargarh

st.

No

l.iame or tne YToTKS r'i , Ai-ea Af,_lOLti- i

Reouii ed -

1 .00t2):

(.i )

Total =

1 .00

5.004

R/R to staff quarter of S. D HospitaI at(:h \.is,,1.

R/R to Treasury officer quaner at Ghasjplrra

5/R to.....ADB Cotony Qtr No . 1 to 9 at ADB

Cotony, Sundargarh

2 Sadar ranisltaar Qtiit t-lc cotony,Sundarqarh

3 Tahasitdar Quarter at Rajgangpur .

4 Sub-Cottector Residence at Sundargarh

5 Coltector Residence at Sundargarh

1 .50

7.00

1.00

1.00

1.00

6 Revenue Qtr No. 7 to 9 occupied by

DIPRO, Sundargarh

Revenue Quarter No 73 lo 77 alSundargarh

1 .50

7

7

2.00

Total = 10.00

RourkelaS/R to. ... .

Qr.No. Di 1 to DZa. i-sirng Lab, Rourketa 1 .50

Qr.No. D/1 to D/6(T/S)of SKDAV Govt

Potytechnic., Rourketa.

1 .50

3

4

5

6

Staff Qrs at govt Auto cottege 1 .50

Exice Staff Qrs udit nagar

TahaSit Staff Qrs Biramitra pur

50

so

ADB staff qr at Panposh 2.00

130.1

720.OO

7 Q.r.No. Dl1 to Dl4.(Dls)of SKDAV

Govt. Potytechnic.,Rourke[a.

1.00

8 Principal Res.of SKDAV GovtPotytechnic., Rourketa.

1.00

9 soiI conservation Staff Qrs at Rourkela 1 .50

10 N.H Staff Qrs at Panposh 1.50

11 Qr.NoF/1 to F l17T ls\of SKDAV GovtPolytechnic., Rourketa.

1 .50

17 6 Nos. D-type Qr. at U.G.l.E., Rourketa. 1 .50

13 qr.No. D/1 to D/2 Vigitance Department

Rourketa.

Total=Cout. n"si1.1'tlu -euitaing

=

C,rand Total=

1.50

19.00

N

S. R. to "r'4

\ \.\c (i

Chief Enllineer (Bui tdings)

Odisha Bhubaneswar

i ail.r,:fii .11:: r::ni.:41€ 3\AAlP 2AiE i9 21-07 2At5 ari4.,!i: ;ier p!.'r.d/. lej

58',1,8t

(Jt (5)(i)

I

> rA lt_//,Ei\ r

Other Agency-ResjdentiaI B uitdi ngs

( Rs. in Lakhs )

Remarks

S/R to.....Cuttack-l 1 A.G. Staff Qr (D type), CDA, Cuttack 3.00

Total = 3.OOJagatsinghpur 1 Staff quarter of D.l.C. office, Jagatshinghpur 3.00

3.00S/R to.....

Bhanjanagar 1 MedicaL staff etrs'Bhanjanagar

near Marathi Sah'i at 2.OO

2 Medical officer's Quarter at KSNagar (

Qtrs)1 No 2.OO

3 Medical Staff Quarters at KSNagar (3 Nos etrs) 2.OO

l'lame of the(R&B) Division

si.No.

Name of tne Works Amou n tRequired

(1) (2) (3) (4) (s)

4 Medical Staff Quarters at Buguda ( .14 Nos) 7.OO

5 5/R to Medical Officer Quarter at Sorada. 2.OO

Total= 10.OOS/R to.....

Baliguda 5/R to Medical. Staff Qr. 5 nos at Gutimarapadasuch as Washing & Painting Repair to Door &'Window at Battiguda.

5.00

2 2 nos. Doctor's Qr. at SDH Battiguda. 5.00

10.ooc/D +^

Nawarangpur Medica[ Staff Quarters at DHH, Nabarangpur 5.001

Total =l 5.0O j

Samba lpur-l 1 8 Nos. Staff Qtr at Sambalpur. 5.005.00Total =

5/R to.....Deogarh 'l DDH Staff quater at Deogarh 3.00

2 DDH Doctor quater at Deogarh s.00

Tota[= 8.0O

Jharsuguda 1

2

J

S/R to.....Doctors Qrs of D-type Jharsuguda Hospital

Nurse Qr s, Jharsuqucla

3.00

1.00

Peon Qrs,Jharsuguda 3.00

\c.E.(B)\SqR\2A18.19\AMp 2A78-19\A M.p_-2O18-19 24-07 2018 CD\A_M p -Res./Other agency_Bes

Total = 9.00

Pg_1./2

ila I'ia a1 i-: " J,.3

(3)

i\: il = ui -,,=i:Lil, ',r,..r.'l

(1) (7\ (4) (s),.-)

I

Kantabaniji

S/R to.....1 Doctor Qtr at Tititagarh

2 Farmist QTR(2 Nos) at Tititagarh

3 LHV Quarter at SDH Patnagarh

4 4 no E type quarter under SDH,Patnagarh.

5 2 nos. staff nurse quarter under SDH Parnagarh

6 VAS quarter at Kantabanji

7 CHC Staff Quarter kantabanji

2.OO

1.00

2.00

1.00

1.00

Khariar

S/R to.....1 S/R to CHC Khariar staff Qtr.at Khariar.

2.00

7.OO

Total= 11.00

4.00

Total= 4.00

s.00

4.00

Total= 9.0O

& 3 Nos. E-TyPe at R.G.H. 3.00

Keonj har 1

S/R to.....Repair to 4 Nos. 'D' type Doctor Qr at DHH,

Keonjhar.

Repair to 4 Nos. 'E' type Sr. Nurse Qr at DHH,

Keonjhar.7

Rourkela

S/R to.....3 Nos. D-TyPe

Rourketa.1

Total= 3.0O

Grand Total= 80.00

n\\}\ \ cChief EnsineeY Buitdings)

Odisha, Bhubaneswar

Ps 212E \C f.G)\SPR\2118 1g\AMP 2A18-1g\A.M P. 2018 79'24 07 2A1S'CD\A',M',P Res',/Ather Aqencv Res

,'.ail:.i,.::

S IATEII.ENTJudiciari,Rcside:ti:l E u ilCings

H

(Rs- in Lakhs)

PuriS/R to... ..Dist Judge ReiiOencJ1

7

3

2.003Nos. 3R Quarter in LtC Cotony Judicial. Dept. 2.OO

3 Nos. D type Quarter near R. K. Mission of Jud.icial 2.O0Deptt at Puri

4 Protocol & SDJM euarter 7.O05 Sub Judge Quarter near R. K. Mission 1.00

f JMFC and Civit Judge at 7.O06 2nos 'D' type er. oNimapada

7C' type Qr. Senior Division at Nima pada 1.00Total= 12.OO

S/R to.....Kh urda 1 ADJ qrs, Khurda 1.00

i

Name of the(R&B) Division

SL.

No.I'iame of the Works Remarks

(3) (5)(4)

Am ou ntReq u i red

(1) (7)

2 CJM qrs, Khurda 1,003 Sr. Civi[ Judge qrs, Khurda 0.504 SDJM qrs. Khurda 0.505 Munisif Qrs. Khurda 1.006 JMFC Qrs. Khurda 1.00

S/R to.....Total= 5.0O

Nayagarh 1 SDJM Qtr at Nayagarh. 0.502 CJM Qtr at Nayagarh. 0

0

5

5

0

03 District Judge etr at Nayagarh.

Total= 1 .50S/R to.....

Cuttack-l 'l rJuges Bunglow No.S.O.-18 (Approach road at Left 2.OOrside)

2 Juges Bungtow No.S.O. -18 (Fixing of M.S. door) 7.OO3 iJuges BungIow No.S.O.-18 (Approach road at Righti 1.00

:side)

4Q r. No.C. B. -2(l), Cantonment, Ctc 1.00J Qr. No.C. B. -'18, Cantonment. Ctc 1.006 Staff Qr of OHC at Katigati (Btock-B) 2.007 A.G. Staff Qr (E type Btock-1), CDA, Cuttack 3.003 A.G. Siaff Qr (E t5,pc tstock,3i. CDh. Cuttlcii9 A.G. Staff Qr (E type Btock-5), CDA, Cuttack 2.00

c E (B)\SpR\2018 19\AMp 2018-19\A M.p.-2018-19 24 07-2018-CD\A_M.p._Res.tudi_Res

Total = 18.00

Ps_L/7

v Name oi tne

iR&D; D,vl sl c; r-'

)r rr&i e Ci L'la ,vOi f.5

(3)

t!a-lti::llio. i

\4) (5 )(ri (7)

S/Rto.....

Cuttack-ll 1 S R to High Court Staff Qr at badamabdi. Cuttack

5 R to High Court Staff of E Type Qtr at High Court

Cotony

S R to High Court St;ff Qr at Badamabadi qtr F 21

Sub-Judqe residence at Banki.

S. D.J.M. Residence at Banki.Tota [=

Panikoili 1 District Judge Qr,JajPur

2 ADJ Qtr. (Dist.Judge)

3 CJM quarter at JajPUr

0. s0

1.00

1 .50

0.50

r. so

5.00

7

3

4

5

2.00

2.001.00

4 JMFC Qtr. at JajPur Road 1.00

5 C TyPe Qr Judiciat at JajPur Road 1 .50

6 D Type Qr Judicial at Jajpur Road 1.s0

Total = 9'0O

KendraPara 1 "C" type qrs.of C. j-M. KendraPara 1.00

2 "C" type qrs.of A.D-J. Kendrapara'

3 "C" type qrs.& Munsif KendraPara'

4 Residencial q rts. Of Sub-Judge KendraPara

itaff qrs.(znos) of Sub-judge at 5uneito, Kendrapara

't .00

1.00

l.oo1.00

5

6 6nos of "F" type qrs.at Khadianga, Kendrapara. 1.00

7 Snos of "D''tYPe qrs.for

Kendrapara.

Judges at Khadianga, 1-00

Total '= 7.OO

JagatsinghPur Judiciat Staff Quarters, JagatsinghPur 5.001

2 SDJM qr at jsPur near court campous 7.71

Total = 7 .71

S/R to.....

Charbatia 1 CtYPequarter sub-Judge Athagarh 1.00

2 Dtype quarter of JMFC Athagarh 0.50

tr for SDJM at Athagarh 0.503 Ctypeqtr occupied bY ADJ at Athagarh 1.004 2nd office q

Total = 3.0O

1.501 Repair to Judicia[ staff qtr at Tatc her

2 Repair to ADJ Qtrs at Talcher 1.50

3 C.J.M qr at Angul 7.00

A

5

o

JMFC qr at Angul

SDJM qr at Angul

Drst. iucge ql aL AllguL

1.00

1.00

i.)i7 Judicial staff qr at Angul 1.50

E:\C.E.(B)\SPR\2O18'lg\AMP 2A18'1g\A M',P '?018'19 24-07'2018 CD\A',M',P','Res-iudl Res

Total = 10.00

Pg.7/1

Angul

, \ar' rc ul L' i::

i RLB r Di.,,isicn

Si irarne oi the ,'/o rxs GAmountRequirr:cl

(41

]RemarksNo

(1) (3)

Dhenkanal 1 Judiciat department of DhenkanaI ers. No J/5Total =

S/R to... ..Ga njam- | District Judge residence at Berhampur

ADJ Qtrs. at BerhampurS. D.J.M. Quarter Judiciit Coiony. Berhampur2nd JMFC qtrs. At Berhampur

5 JMFC residence at Digapahandi

6 CJM qtrs. at Berhampur

3 .00

3.OO

1

7

3

4

7.O0

2.007.on1.OO

2.002.00

7 M.A.C.T.Judge(Res.),at Berhampur 1.008 Registrar quarter at Berhampur9 JudiciaI Staff quarter at Cou rtpeta, Berham pu r

1.001.OO

Total 14-OOS/R to.....

Ganjam-ll 1 S.D.J.M. & JMFC qrs. At Charrapur 2.002 JMFC qrs at Kha[tikote 2.OO

Total= 4.O0S/R to.....

Bhanjanagr 1 JudicaI Staff Qtrs at Bhanjanagar2 Judicial officiat Staff Qtrs at Aska (] Nos3 J.M.F.C. Quarter at Sorada.

1.002.OO

2-00 -

4 J.M.F.C. Staff Quarter at Sorada, 2.OO

Total= 9.OOS/R to.....

Boudh 1 Dist. Judge Qtr Boudh 5.002 S.D.J.M.Qtr Boudh 2.00

Tota 7.OOS/R to.....

Batliguda 1 Sub-Judge Qtr. such as Washing and paintingRepair to Door &. Window at Battiguda.

2 SDJlvl Qtr. such as Washing and painting Repair toDoor &. Window at BaLtiguda.

2.00

2.00

3 JMFC Qtr. such as Washing and Painting Repair to' 2.00Door & Window at Battiguda.

4 ADJ Qtrs. near RD Office. 2.OO

Total= 8.0OS/R to.....

Koraput 1 Repair to Addt. Dist. Judge er. in DNK Cotony1 R,el3I io .i nir. F i\;]a stiii eil . at Jijil i,r t\uidpuL

2.00

1 .51)3 Repair to Munsif Judge Qr. in LIC Cotony 1.50

\c.E.(B)\SqR\2O18 19\AMp 2018-19\A.M.p.-2018-1g-24 07-201|_CD\a.M.p.-Res ludt Res.

Total= 5.0O

Pe-z/z

(2t (s)

& rdi-,e Oi ii-a , ' ar '.: ...i L,.. .,

1l'qrr.itrr\:^. a.t ina

(Ri3r a) ivlslo n

S

i 0

t4l (5r(i )(l)

Jeypore

S/R to. ....

NawarangPu r '1 District Judge Quarter at Nabarangpur

2 CJM, Quarter at NabarangPur

SDJM, Quarter at NabarangPur

A.D.J. Quarter at NabarangPur

JMFC Quarter at Umerkote

S/R to.....1 2nos JMFC Quarter at JeYPore.

2 JMSC Quarter at JeYPore

I JMFC Staff Quarters at KotPad

4 Judiciat Staff Quarter F-Type No-1 at JeyPore'

5 Judiciat Staff Quarter F'Tyng No 2 at Jeypore'

6 Judiciat Staff Quarter F-Type No-3 at Jeypore'

7 Vigitance Judge Court at Jeypore.

8 ADJ Quarter at JeYPore.

1 .50

2.001 .502.002.00z.oo

.50

.001

7

Total'. 14.50

2.001 .501.50

1,503

4

51.50

Rayagada-l

S/R to.....1 Reapir to res. of Dist. Judge (PWD lB {nl91u1e)2 Repair to ADJ Quarter at RaYagada

Total = 8.OO

2.001 .50

2.003 Repair to CJM Quarter at Rayagada

4 Repair to SDJM Quarter at RaYagada 2.00

5 Repair to Sub-Judge Quarter at Rayagada 'l .50

Total = 9.0O

S/R to.....

Rayagada-ll 1 Sub-Judge Residence at GunuPur 2.OO

2 'l Nos C type for sub-judge at Gunupur 1 .50

3 4NosEtyPe 2NosG unupu r

F type Qrs for Judiciat staff at 1-5O

Total = 5.OO

S/R to.....SambalPur-l 1 District Judge Residence at Sambatpur. 2.50

7 C.J.M Qtr at LIC Cotony, Motijharan, Sam batpur 1 .50

3 S/R such as repair & renovation of Sub-Judge (ltr 1.50

at Sakhipara Sambalpur (Qtr No-3).

4 Judge Qtr at Sakhipada, Sambatpur.Total = 7.OO

S/R to.....I.)jcrrirf (,,h .l,,.lca .L':t?r ,t 19^or.h

1 .50

2 District Judge quater at Deogarh

3 S.D.J.M resident at Deogarh

3003. O0

l.oo8.OO

E:\C.E.(B)\SPR\2018'1|\AMP 2018 1g\A'M P 2018'19 24'07 2018'CD\A'M P'Res"tudi'Res

Total =

Pg_4/7

),

irame cf riie(RE B) Divjsion

(1)

Jharsuguda

Kantabaniji

Sr

No

lri i-,i of Llr: \^joi Ks

R:quiredi,enrarks

@

S/R to.....1 SDJM Qrs at Jharsuguda

2 C.J.M. Q5s. at Jharsuguda

3 Qrs. Of Judiciat Jharsuguda

7.507.507.OO

S/R to.....1 ADJ I SDJM Qtr. at Tilitagarh7 Session Judge Qtr & JMFC q-arter at fiti tagarh

3 JudiciaI staff quarter at Titllagarh

4 Addt. District Judge quarter at Patnagarh

5 S.D.J.M. Quarter at Patnagarh

6 2 nos Judicial staff qrs. at Patnagarh

Total = 7.O0

7.OO

ioo1 .501 .50

1.O0

1.00

7 JMFC Qtr at Kantabanji 1.O0

Total =' 9.00

(7) (3) (4) (5)

S,/R to.....Bolangir 1 Dist. Judge Qtr,Batangir 3.00

2 Judicia[ Staff Qtrs ,Batangir3 JFMC & CJM quarter at Sonepur

2.002.O0

Total = 7.OO

S/R to.....Sonepur 1 1 Nos. CJM Quarter of Agricutture Cotony at 1.00

Sonepur

2 ADJ qurter at Sonepur Near PWD lB

3 C Type quarter for Sub-Judge for Senior Division atSonepur

1.00

7.O0

4 SDJM qurter at Sonepur 1.00

5 Disttrict Judge Quarter of Agricuttur Cotony at Sonepur 1 .506 Judicial Staffs Quarter at Sonepur 1 .50T SDJM Quarter at Birmaharajpur

8 SDJM Quarter at Birmaharajpur9 Sub Judge qtr. At Birmaharajpur

S/R to.....Kalahandi 1 Sub-Judge quarter at Dharamgarh

1.001.00

2.00Total =t 12.O0

1.002 Registrar Quarter at Bhawanipatna 1.003 CJM Qr at Bhawanipatna 1.004 Sub-Judge Qr at Bhawanipatna 1.00

5

b

7

ADJ (Vigitance) qr at Bhawanipatna

ADJ Fami[v coLrrt qr at Blrau,anrpa.tna

SDJM qr at Bhawanrpatna

1.00

1.00

1.00

E:\C E.(B)\SPR\2O18-19\aMP 2018-1,9\LM.P -2018-19-24 07 2018-CD\A.M P. Res..lldt Res

Total = 7.OO

Pg_sl7

n

l\ .1 il-La a, L rt

(1)

\arr ( L' I r- \'L) r!> /ril ULr r

Secur ac

(51

)1.

(2\ (l) (4\

7.OO

2.00

3.O0

Khariar

Balasore-l 1

7

S/R to. .. . .

'1 ADJ Qtr.& Head clerk Qtr.such as Addt.& atteratrorr

of JudiciaI Deptt. Nuapada.

2 Sub-Judge Qtr.at Nuapada.

3 C.J.M.Qtr.at Nuapada.

4 Judiciat staff Qtr.at Nuapada.

5 Dist. Judge Qtr.at Nuapada.

Total=

S/R to... . .

Repair and henovationlo Civlt SuU luage Quart€rat NiLqiri

Repair and Renovation to SDJM Quarter at Nitagiri

2.O0

1 .501 .501-00

8.00

Total= 5.00

S/R to.....Balasore-ll 'l J.M.F.C. Quarter at Jateswar

Bhadrak

S/R to.....Munisf Qrs at Bhadrak

i,o..l.tt,\ Qrs at Bhadrak

B'Type Qrs. For A.D.J at Bhadrak

Total=5.O0

5.00

1

1

1

2

l

.o0

.00

.o01

4 C'Type Qrs. For C.J.M at Bhadrak

5 D'Type Qrs. at Samaraipur J.M.F.C 3 nos

1.00loo

6 C' Type Qrs

Cotony)

For Sub-judqe at Bhadrak (Blo,:k 1.00

7 Twin Judiciary Magistrate Qrs at Bhadrak 1.O0

Total= 7.OO

Mayurbhanj

S/R to.....1 Residence of lst Addt. Dist. & Seasons Judge at 2.OO

Baripada

2 C.J.M. Qrs. at Baripada 2.00

3 Residence of District Judge at Baripada . 2.00Total= 6.00

S/R to.....Rairangapur 1 8 nos Judicial Peon staff Qr at Rairangpur

2 3 nos F type Qr of Judicial Deptt at Rairangpur

S/R to.....

1.75

1.00

Tota[= 2.75

2 Repair to 'C'type Qrs occupied by Registrar at Park

Line, Keonjhar.

t:\C.E.l \SPR\2018'19\AMP 2A18'19\A M.P.-2018 19'24 07'2018'CD\A.t\,1.P.'Res.tudt Res

2.00

PE-6/7

,\:] |lj= '|i Ll]=

'R!B t DiVisror llol\aille aI ii ra , \ !i (5 AMOUTIi

Requi'edI-\ e l-r ra[lis

{1) (2)

Ghatagaon

(3)

3 Reparr 'Lo D type Qrs occupieo by Suo,judge atPark Lrne, Keonj har.

4 Repair to 1 No. of E'Type Qr of Judicial ar Barbit

5 Repair to Sub - Judge Qr at Champua6 Repair to SDJM qr. At Champua

1 R/R toGhasipura

Total=Gramanyayadhisi Qr Anandapur at

2 rzn !o Sr4;luglge quarter4ranagpq. q1 CnaslOqla

3 R/R to J.M.F.C. quarter Anandapur at Ghasipura

4 R/R to S D.J.M Quarter at Ghasipura.

7.00

7.O0

2.002.0012-507.OO

?-qq2.OO

2.00rotil = 8.O0

(4) (5)

Sundargarh 1 CJM Qtr at Sundargarh 2.O02 ADJ Qtr at Sundargarh 2.00

Total = 4.O0

Rou rkelaS/R to.....

1 Sub Judge qr Qrs. at Uditnagar,2 JMFC Qrs. 1t Uditnagar.3 Sub-judge Qtrs Bonai

4 Judicial staff Qrs. At new L.l.C cotony5 Judicial Qtrs Bonai

1.001.000.501.501.00

6 ADJ Qrs. at Bonai. 1.O07 Judicial staff Qrs. At Uditnagar 1.00B Judiciat staff Qr No. 3R at Uditnagar, Rourkela. 1.009 Judicial staff Qr No. RL/4, 2RA Qrs at Uditnagar,

Rourketa.1.O0

10 B'type Qrs. Of Judicial Department at Uditnagar(ADJ Qr)

1.O0

11 2no of C'type Qrs. Of Judicia[ Department at 1.50Uditnagar(CiviI Judge Qr)

Total= 11.50Grand Total= 791 .46