SALINAN PB-26-2020.pdf - JDIH Kulon Progo
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of SALINAN PB-26-2020.pdf - JDIH Kulon Progo
1
A. ALAT TULIS KANTOR
Harga Termasuk Pajak
1 3 4 5
KERTAS :
- HVS 60 gr. Folio Rim 53,000 Sinar Dunia
- HVS 60 gr. Double Folio Rim 85,000 Sinar Dunia
- HVS 70 gr. Kuarto Rim 55,000 Sinar Dunia
- HVS 70 gr. Folio Rim 58,000 Sinar Dunia
- HVS 70 gr. Double Folio Rim 94,000 Sinar Dunia
- HVS 80 gr. Kuarto Rim 58,500 Sinar Dunia
- HVS 80 gr. Folio Rim 66,000 Sinar Dunia
- HVS berwarna 70 gr. Folio Rim 67,000 Sinar Dunia
- Kertas CD/Pastur folio Rim 30,500 phoenix
- Kertas NCR (putih) Rim 45,000 Top
- Kertas NCR (warna/putih) Rim 56,000 Midle
- Kertas NCR (warna-warni) Rim 65,000 Putih Top (1 set 5 warna)
- Kertas buram tebal Rim 30,500 Paper One
- Doorslag folio Rim 46,000 Yellow (merk naga mas)
- Doorslag (plano) 44 x 69 Pak 95,000 30 gsm, isi 100 lembar - Doorslag (plano) 44 x 69 lembar 1,100 30 gsm
- Duplicator folio IKA Rim 62,000 DIM
- Duplicator folio IKA Rim 58,000 Snow White Indah Kiat
- Duplicator folio Ganesha Rim 57,000
- Duplicator double folio Rim 120,500
- Bergaris double folio Pak 22,500 isi 100 lembar - Padalarang lembar 2,200
- Manila putih lembar 2,400 Ukuran A2
- Manila warna lembar 3,000 60 x 90 cm 150 gram
- Kertas samak payung lembar 2,000
- Karbon folio Dos 63,500 Daito
- Karbon double folio Dos 117,000 Daito
- Kertas Struk HVS Rol 4,500 58 x 48 mm, 1 ply - Kertas Struk HVS Pak 45,000 58 x 48 mm, 1 ply, isi 10 rol
- Telex 3 play Rol 87,500 Jaya
- Kertas Fax Rol 18,000 Ojifax
- Stensil Sheet folio Dos 82,000 Daito
- Stensil Sheet double folio Dos 92,000 Daito
- Kertas Kalkir 70 gram Pak 60,000 Diamant, isi 50 lembar
- Kertas Kalkir 80 gram folio Pak 40,000 Diamond, isi 50 lembar
- Kertas Kalkir 80 gram folio Pak 70,000 Diamant, isi 50 lembar - BC Sampul Pak 28,500 Polos
- Kertas BC Folio Muda Pak 28,000 F4
- Kertas BC Folio Tua Pak 38,000 F4
- Kertas BC Muda planoan lembar 3,600 Ukuran A2
- Kertas BC Tua planoan lembar 3,600 Ukuran A2
- Kertas Samson lembar 1,800 90 x 120 cm 80 gsm - Kertas Samson lembar 3,000 90 x 120 cm 125 gsm - Kertas Samson Rim 850,000 90 x 120 cm, 80 gsm - Kertas casing lembar 1,500 65 x 100 cm
- Kertas Sticker label Pak 30,500 Ukuran A4 isi 20 pcs
- Kertas Mesin antrian Rol 26,500 Struk thermal paper
- Mica warna tua Pak 31,000 Ukuran F4
- Mica warna muda Pak 31,000 Ukuran F4
2 KERTAS CONTINUES FORM :
a. 9 1/2 x 11 NCR
- 1 ply (2000 sheet) Box 270,000 Sinar Dunia
- 2 ply (1000 sheet) Box 424,000 Sinar Dunia
- 3 ply (1000 sheet) Box 437,000 Sinar Dunia
- 4 ply (500 sheet) Box 296,000 Sinar Dunia
2
1
BAB I. SARANA KERJA
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
1 3 4 5
b. 14 7/8 x 11 NCR
- 1 ply (2000 sheet) Box 330,000 Sinar Dunia
- 2 ply (1000 sheet) Box 458,000 Sinar Dunia
- 3 ply (1000 sheet) Box 723,000 Sinar Dunia
- 4 ply (500 sheet) Box 550,000 Sinar Dunia
- 5 ply (500 Sheet) Box 690,000 Sinar Dunia
c. 9 1/2 x 11
- 1 ply (2000 sheet) Box 197,000 Sinar Mentari
- 2 ply (1000 sheet) Box 306,000 Sinar Mentari
- 3 ply (1000 sheet) Box 463,000 Sinar Mentari
d. 14 7/8 x 11
- 1 ply (2000 sheet) Box 298,500 Sinar Mentari
- 2 ply (1000 sheet) Box 467,500 Sinar Mentari
- 3 ply (1000 sheet) Box 660,500 Global
3 BUKU :
- Buku tulis isi 38 hlm Buah 3,600 Sinar Dunia
- Buku tulis isi 42 hlm Buah 5,800 Big Boss
- Buku tulis isi 42 hlm Buah 4,500 Sinar Dunia
- Buku tulis isi 58 hlm Buah 5,500 Sinar Dunia
- Register kuarto 50 hlm Buah 8,000 Paperline
- Register kuarto 100 hlm Buah 15,000 Paperline
- Register kuarto 200 hlm Buah 18,000 Paperline
- Register folio 50 hlm Buah 12,000 Paperline
- Register folio 100 hlm Buah 18,000 Paperline
- Register folio 200 hlm Buah 33,000 Paperline
- Kas folio isi 50 hlm Buah 15,500 Kiky
- Kas kuarto 50 hlm Buah 14,000 Kiky
- Kas kuarto 3 dan 2 kolom 100 hlm Buah 15,500 Kiky
- Kas Folio 3 dan 2 kolom 100 hlm Buah 28,500 Kiky
- Ekspedisi 100 hlm Buah 14,500 Paperline
- Tabelaris 9 kolom 50 hlm Buah 39,000 Ukuran : 32.5 X 33 cm
- Tabelaris 12 s/d 24 kolom 50 hlm Buah 53,000 Ukuran : 50 X 32.5 cm
- Blocknote 50 hlm Buah 3,500 1/2 folio
- Blocknote 100 hlm Buah 8,500 folio
- Buku Oktavo Buah 6,000 isi 100
- Buku Oktavo Buah 5,000 Paperline A6 isi 100
- Buku Agenda isi 50 lbr Buah 17,500 Ukuran A6
- Buku Agenda isi 100 lbr Buah 26,000 Buku agenda spiral ukuran A5
BANTALAN CAP :
- Bantalan cap Hero C9 Buah 8,000 Stamp Pad Hero
- Bantalan cap Buah 6,000 Joyko Stamp Pad
5 STICKNOTE :
- Kertas Kecil Buah 6,000 Index Notes Kenko 50x20mm
- Kertas Tanggung Buah 9,500 Post It 656
- Plastik Besar Buah 19,000 Post It 657
6 Snelhechter plastik folio Buah 10,000 seagul
7 Snelhechter plastik transparan Buah 4,000 Mika plastik transparan
8 Snelhechter kertas Buah 2,000 Merk biola 5001
9 Stopmap plastik folio Buah 12,000 seagul
10 Stopmap plastik tempat raport lbr 34,000 plastik vinil warna
11 Stopmap kertas polos Buah 1,000 Executive
12 Stopmap kertas polos Buah 2,500 Biola
13 Stopmap kertas batik Buah 3,000
14 Stopmap odner 60 Bi Buah 17,000 Papeo
15 Stopmap odner 60 Bi Gema Buah 27,000
16 Stopmap odner Bantek Tebal Buah 33,000
17 Stopmap odner Bantek 1/2 Folio Buah 22,000
18 Map plastik bertali ukuran folio Buah 3,000 Dataflex
19 Map kancing transparan Buah 3,000 Dataflex
20 Map kancing transparan Buah 6,000 eagle
4
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
3
1 3 4 5
21 Map plastik jaring Buah 10,000
22 Map plastik Resleting Buah 14,500 Zipper Bag File
23 Portepel ukuran besar Buah 37,500 42x35x30cm
24 Portepel ukuran kecil Buah 23,000 39x19x28cm
25 File box keranjang Buah 23,500 Sysbox
26 File box keranjang Buah 23,500 Maspion
GARISAN :
- Mika 30 cm Buah 3,600 HSI Topla
- Mika 30 cm Buah 3,600 Butterfly
- Mika 40 cm Buah 14,500 Butterfly
- Mika 50 cm Buah 16,500 Butterfly
- Mika 100 cm Buah 48,000 Butterfly
- Segitiga No. 8 Set 12,500 Triangle
- Segitiga No. 12 Set 21,500 Triangle
- Besi 30 cm Buah 9,500 Joyko
STAPPLER :
- Stappler No. 10 Buah 18,000 SDI
- Stappler No. 10 Buah 10,000 Kenko
- Stappler No. 1102 Buah 18,000 SDI
- Stappler No. 10 Buah 21,500 Max
- Stappler HD 30 Buah 50,500 Kenko
- Stappler HD 50 Buah 64,500 Max
STAPPLES :
- Stapples No. 10 Dos 2,500 Great Wall
- Stapples No. 10 Dos 3,000 Etona
- Stapples No. 10 isi 20 Dos Dos 31,500 Etona
- Stapples No. 24/6 Dos 4,000 Great Wall
- Stapples No. 24/6 Dos 4,000 Etona
- Stapples No. 24/6 Dos 8,000 Max
- Stapples No. 24/6 isi 20 Dos Dos 65,000 Etona
- Stapples No 24/6 isi 20 Dos Dos 103,500 Max
- Stapples No. 1210 Dos 31,000 Max
- Stapples No. 1213 Dos 32,000 Max
- Stapples No. 1215 Dos 34,000 Max
- Stapples No. 1217 Dos 40,000 Max
TINTA :
- Tinta Hapus/Fluit Correction Set 35,200 Tombow Mono Zero Eraser
- Tinta Stempel Ungu Botol 6,000 5 ml
- Tinta Stempel warna Botol 24,000 Novus 50 ml
- Tinta Vulpen Botol 38,500
- Tinta Vulpen Botol 60,000 Parker 57 ml
- Tinta Spidol Whitboard Buah 20,000 BG 12
- Tinta Spidol Permanent Buah 10,500 MIG-20
- Tinta Stensil ( isi 2 tube ) Dos 117,500
- Tinta Stensil Tube 152,500 300 gram
- Tinta Rapido Rotering/Steadler Botol 87,000 Rotring 23 ml
- Tinta Refil Printer Dos 41,000 Dataprint
- Tinta Refil Printer Botol Botol 50,000 Blueprint 100 ml
- Isi Ulang Stempel warna Kali 35,500 2 warna
- Tinta Riso Grab Tipe CR Dos 416,000 Original
- Tinta Riso Grab Tipe KS Dos 416,000 Original
- Master Riso Grab Tipe RZ Dos 293,000 Original
- Master Riso Grab Tipe KZ Dos 416,000 Original
- Master Riso Grab Tipe CZ Dos 570,000 Original
31 Koreksi Lak Buah 17,500 32 Spidol :
- Spidol kecil buah 1,600
- Spidol Kecil 4 warna Set 6,000
- Spidol Kecil 12 warna Set 16,000
30
27
28
29
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
4
1 3 4 5
- Spidol besar permanent Buah 8,500
- Spidol besar White Board Buah 9,300
- Spidol Putih/ Emas Buah 17,100
- Spidol Overhead Buah 12,000 33 Ball Liner Buah 20,000 34 Kapur Tulis :
- Kapur tulis polos Dos 8,200 Sarjana
- Kapur tulis berwarna Dos 11,800 Sarjana
35 Lem :
- Lem Kertas Ukuran Sedang Botol 3,500 Glukol
- Oglue 30 cc Botol 3,000 Povinal
- Oglue 50 cc Botol 5,000 Povinal
- Lem Alteco 3 gram Buah 7,500
- Lem castol Buah 15,500 51 cc
- Lem castol kecil Buah 7,500 21 cc
- Lem Aica Aibon Buah 12,000 Kaleng Fox
- Lem fox Botol 9,500
- Lem fox Botol 18,000 Putih
- Lem Stick Buah 7,500 Pronto 15 gr
- Lem Stick Buah 5,000 Pronto 8 gr
36 Bolpoint :
- Bolpoint Biasa Buah 3,500
- Bolpoint Gel Tizo Buah 5,100
- Bolpoint Pilot Buah 18,000
- Bolpoint Pentel Buah 77,500
- Bolpoint Pentel No. 2 Buah 25,000
- Isi Pentel Buah 23,000
37 Pensil :
- Pensil hitam HB (CW/Binder) Buah 4,500
- Pensil hitam HB Buah 4,200 Steadler
- Pensil hitam 2B Buah 5,500 Steadler
38 Binder Clip :
- Binder Clip No.105 Dos 4,300
- Binder Clip No 107 Dos 4,500
- Binder Clip No.111 Dos 8,000
- Binder Clip No.155 Dos 11,500
- Binder Clip No 200 Dos 13,500
- Binder Clip No.260 Dos 22,500
39 Paper Clip :
- Paper Clip No. 3 Dos 3,000
- Paper Clip Jumbo Dos 5,000
40 Pita mesin hitung blackred Buah 14,100 Daito nylon
41 Pita mesin tulis black Buah 35,200 Daito kaleng
42 Lak ban :
- Lak ban 5 cm Rol 18,600
- Lak ban 3 cm Rol 14,500
43 Selotipe :
- Selotape besar Rol 12,000 Cokelat
- Selotape besar OPP Bening Rol 12,000 OPP Bening
- Selotape kecil Rol 2,000
- Selotape Doubletape kecil Rol 6,000 1/2 inch
- Selotape Doubletape sedang Rol 6,500 1 inch
- Selotape Doubletape besar Rol 12,300 2 inch
- Dispenser tape besar Buah 35,000 Joyko 2 inch
- Dispenser tape sedang Buah 65,000 SDI
- Dispenser tape kecil Buah 21,300 Joyko 1/2 inch dan 1 inch
44 Perforator :
- Perforator model 220 Buah 14,500 General
- Perforator model 220 Buah 18,800 Kenko
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
5
1 3 4 5
- Perforator model DP 720 Buah 95,000 Kangaroo
- Perforator 30 XL Buah 20,000
- Perforator 40 XL Buah 35,200
- Perforator 85 XL Buah 55,000
- Perforator 2 lubang TATAP-2 Buah 770,000
45 Pines Dos 2,000 Hanfang
46 Tip Ex :
- Tip Ex Set 11,500 Oles
- Tip Ex Set 27,600 Pentul
- Tip Ex Kertas Buah 12,500 Joyko 21m
- Tip Ex Btl 5,000 Kenko
47 Penghapus :
- Karet Penghapus Buah 2,500 Joyko
- Setip Kombinasi Buah 7,000
- Penghapus Papan tulis Buah 6,500 Gunindo
- Penghapus White Board Buah 10,600 Joyko
- Penghapus White Board tanggung Buah 7,500
Stempel :
- Tanggal Buah 20,000
- Biasa Buah 38,200
- Warna Buah 80,000
49 Sepon Air Buah
50 Pena sheet Buah 20,500
51 Rugos ukuran 4 mm s/d 9 mm Lembar 35,200 VIP
52 Remover Buah 12,000 Bantex
53 Stabilo Boss :
- Stabilo Boss 4 Warna Set 35,000
- Stabilo Boss 6 Warna Set 65,000
54 Pisau :
- Pisau Cutter Uk. K 200 Buah 9,500 Joyko
- Pisau Cutter Uk. L 500 Buah 17,500 Kenko
- Pisau Cutter Uk. L 500 Buah 16,500 Joyko
- Pisau Cutter SDI 0423 Buah 32,500
- Isi Cutter Uk. K.200 Buah 3,000 Kenko
- Isi Cutter Uk L 500 Buah 9,000 Kenko
- Pisau Silet Buah 2,500 Silet Tangkai Sdi 0104
55 Pendukung Printer :
- Ribbon Printer e-KTP Buah 4,015,000
- Cleaner kit e-KTP Buah 742,500
- Film Printer e-KTP Buah 1,815,000
- Ribbon Printer KIA Buah 1,078,000
- Cleaner kit KIA Buah 1,045,000
- Epson LX - 80/86 Buah 103,000
- Epson LX - 300 Buah 71,500 S015516
- Epson LX - 800 Buah 90,000 S015516
- Epson LQ/LX - 1000/1050 Buah 145,000 S015511
- Pita Epson DFX 9000 Buah 320,000 S015505/S015384
- Catridge Printonix P 7000 Buah 750,000 255051-103
- Logitec FT 5002 Buah 70,000
- Canon Black Toner 303 Buah 1,158,000 Original
- Canon Black Toner 325 Buah 1,050,000 Original
- HP 51625 A Botol 525,000
- Toner 12 A - HP P 1020 Buah 1,425,000 Original
- Toner 15 A - HP P 1010 Buah 1,650,000 Original
- Toner 35 A - HP P 1006 Buah 1,205,500 Original
- Toner 36 A - HP P 1005 Buah 1,100,000 Original
- Toner 78 A - HP 1566/1606 dn Buah 1,320,000 Original
- Toner HP 79A Black Laserjet Cartridge Buah 1,065,000 Original
- Toner 540 B - HP CP 1215 Buah 1,155,000 Original/125 A
- Toner HP 17 A Buah 1,100,000 Original
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
Kenko
48
6
1 3 4 5
- Toner HP 83 A Buah 1,200,000 Original
- Toner 85 A - HP P 1102 Buah 1,103,000 Original
- Toner 540 C.Y.M HP CP 1215 Buah 1,045,000 Original
- Toner G 30 B - HP 2025 Buah 1,650,000 Original
- Toner 530 C.Y.M HP 2025 Buah 1,540,000 Original
- Toner CE 310 A - HP Laserjet CP 1025 Buah 973,000 Original/126 A
Buah 1,033,000 Original/126 A
- Pita LQ 2170 Buah 110,000 C 13 SO 10062/C13 SO 10074
- Pita LQ 2180 Buah 110,000 C 13 SO 10062/C13 SO 10074
- Pita Komputer Cartridge Set 55,000
- Pita Ribbon Catridge 7754 Set 71,500
- Ribbon Epson LX310 Set 67,700 S015632
- Tinta Ecoject Set 110,000
- Tinta Printer HP GT 51 Set 106,000
- Tinta Printer HP GT 52 Set 115,000
- Tinta Brother D 608 K Set 150,000
- Tinta Brother BT 6000 Set 129,000
- Tinta Brother BT 5000 Set 129,000
- Tinta Epson T6641 Set 94,000
- Tinta refill Epson 110 Botol 220,000
- Tinta refill Epson WF 7711 Botol 1,450,000
- Tinta Refill Brother MFc- L2700 DW Botol 650,000
- Tinta Refill Epson L310 Botol 100,000
- Tinta Printer sticker label Set 550,000
- Tinta Printer Pixma Cannon Botol 160,000 G1 - 790 Black
- Tinta Printer Pixma Cannon Botol 140,000 G1 - 790 CYM
- Catridge Deskjet Ink 4645 Set 146,500 HP 678
- Cannon BJ Cartridge BC- 03 Buah 440,000
- Cannon BJ Cartridge BC- 20 Buah 605,000
- Cannon Cartridge BC 05 Buah 501,000
- Cannon Cartridge PG 40 Buah 316,500 Original
- Cannon Cartridge PG 810 Buah 275,500 Original
- Cannon Cartridge PG 830 Buah 234,300
- Cannon CL 41 Buah 358,500
- Cannon CL 811 Buah 295,000
- Cannon CL 831 Buah 325,000
- Cannon CL 746 Buah 340,000
- Cannon CL 57 Buah 240,000
- Cannon PG 740 Buah 220,000
- Cannon PG 745 Buah 235,000
- Cannon PG 47 Buah 135,000
- Cannon PG 88 Black Buah 225,000
- Cannon PG 98 Colour Buah 270,000
- HP 802 black Buah 145,000
- HP 802 colour Buah 225,000
- HP 678 black Buah 146,500
- HP 678 colour Buah 165,000
- HP 704 black Buah 125,000
- HP 704 colour Buah 125,000
- HP 680 black Buah 148,000
- HP 680 colour Buah 148,000
- HP 932 Black Buah 335,500 HP Office Jet 7510
- HP 933 XL C.Y.M Buah 315,000 HP Office Jet 7510
- HP 62 Black Buah 325,000 HP Office Jet 200
- HP 62 Colour Buah 345,600 HP Office Jer 200
- Toner Brother TN 1080 Buah 365,000
- Cartridge Brother LC 3617 Buah 180,000
- Cartridge Brother LC 583 Buah 152,500
- HP Catridge 21 Black Buah 287,500
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
- Toner CE 311 A - 313 A - HP Laserjet
CP 1025
7
1 3 4 5
- HP DJ 78 Buah 577,500
- HP DJ 95 Buah 410,000
- HP DJ 21 Buah 275,000
- HP DJ 22 Buah 300,000
- HP DJ 60 Buah 310,000
- HP DJ 60W Buah 360,000
- HP DJ 97 Buah 500,000
- HP DJ 96 Buah 510,000
- HP DJ 901W Buah 358,600
- HP DJ 901 Buah 240,000
- HP DJ 802 Buah 145,000
- HP DJ 802W Buah 470,000
- HP DJ 703W Buah 150,000
- HP DJ 703 Buah 128,500
- HP DJ 702 Buah 550,000
- HP DJ 98 Buah 315,000
- Epson Catridge TO 38 Buah 70,000
- Epson Catridge TO 39 Buah 50,000
- Lexmark Catridge 17 Black Buah 362,000
- Refil LQ 21/70 / 80 Buah 100,000
- Isi Toner Buah 145,000 Type HP 17A,
85A,83A,79A,36A, 35A/
sejenis
Buah 165,000 Type HP 12A, Canon 303/
sejenis
Buah 170,000 Type HP 49A/sejenis
Buah 350,000 Type HP 55A/sejenis
Buah 253,000 Per warna
- Drum Toner Buah 125,000
56 Flash Disk :
- Flashdisk 4 GB buah 75,000
- Flashdisk 8 GB buah 100,000
- Flashdisk 16 GB buah 125,000
- Flashdisk 32 GB buah 150,000
- Flashdisk 64 GB buah 200,000
- Flashdisk 16 GB dual USB buah 150,000 Type C OTG
- Flashdisk 32 GB dual USB buah 315,000 Tipe C OTG
- Flashdisk 64 GB dual USB buah 370,000 Drive M3.0 OTG
58 CD / DVD :
- CD R Vinil 700 MB buah 7,500
- CD R plus GT.PRO buah 5,000
- CD R SPC buah 5,000
- DVD R SPC buah 6,500
- DVD R plus GT.PRO buah 5,000
- CD R 52 x 700 MB buah 5,500
- CD RW 4 x 24 x cone buah 9,000
- CD RW 8 x 12 x cone buah 10,000
- CD RW 4 x 24 x cone plus buah 10,000
- CD DVD + RW 4 X 47 GB buah 13,500
- CD DVD R 16 X cone buah 6,000
Amplop :
- Putih Ukuran Kecil Dos 11,000 Merpati
- Putih Ukuran Sedang Dos 16,000 Merpati
- Putih Ukuran Besar Dos 21,500 Merpati
- Putih Ukuran Sedang Dos 18,000 Paperline
- Putih Ukuran Besar Dos 26,000 Paperline
60 Ammo Diazo Paper-Ammonia Process Roll 81,900 Ukuran : 1.10 x 20 m
Plastik OHP :
- Plastik OHP Yasica Pak 65,000 50 lembar
- Plastik OHP Yasica Buah 3,000 eceran
- Plastik OHP Diagon Pak 38,000
2
59
61
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
8
1 3 4 5
Gunting :
- Gunting SPM Buah 9,000
- Gunting FM Buah 14,500
- Gunting SPL Buah 13,000
- Gunting OSS Buah 5,000 63 Benda Pos :
- Perangko Rp. 3.000,- Lembar 3,000
- Meterai Rp. 3.000,- Lembar 3,500
- Meterai Rp. 6.000,- Lembar 6,500 64 Kartu SAM Set 271,200 65 Rautan Pensil :
- Rautan Kecil Buah 3,500
- Rautan Sedang Buah 5,000
- Rautan Besar Buah 28,000 Rautan meja
66 Crayon :
- Crayon isi 24 Warna Set 30,000
- Crayon isi 55 Warna Set 90,000
- Crayon oil pastel 48 Set 115,000
- Oil pastel 12 warna Set 25,000
B. ALAT BANTU KANTOR
Harga Termasuk Pajak
1 3 4 5
1 Botol 15,000 900 ml
2 Botol 12,000 800 ml
3 Botol 18,700 250gr
4 Plage Spray Besar Botol 39,000 350 gr
5 Glade Spray Botol 20,000 250 gr
6 Glade Spray Besar Botol 27,500
7 Glass Cleaner Botol 18,000 500 gr (Clear/Clink)
8 Hand wash pump Botol 26,000 Dettol 250 ml
9 Hand wash refill Buah 18,000 Dettol 200 ml
10 Sabun pencuci piring Botol 30,000 Sunlight 750 ml
11 Sabun pencuci piring refil Buah 21,000 Sunlight 800 ml
12 Pembersih Lantai Botol 18,000 Soklin 900 ml
13 Pembersih lantai Botol 10,000 Soklin 450 ml
14 Pembersih lantai refil Buah 10,000 Super pell 400 ml
15 Pembersih lantai refil Buah 17,500 Super pell 800 ml
16 Pembersih Lantai Botol 18,500 wipol 450 ml
17 Pembersih lantai Botol 25,000 wipol 800 ml
18 Vixal Botol 18,000 500 ml
19 Vixal Botol 24,000 800 ml
20 Bagus Tolilet Ball set 36,000 Isi 6
21 Porstek Botol 23,500 1000 ml
22 Baygon Spray Botol 50,000 Jumbo
23 Hit Spray Botol 47,500
24 Lap pel biru besar Buah 25,000 Gading / Refipell
25 Pel lantai gagang Buah 90,000 Destek
26 Keset Sepet Buah 34,000 Polos Halus
27 Keset Karpet Buah 40,000 NG
28 Keset kain benang Buah 17,500
29 Keset karet Buah 40,000
30 Sapu Cemoro Buah 25,000 Kipas besar
31 Sapu Sabut Buah 16,500
32 Sapu lidi Buah 15,000
33 Serok sampah plastik Buah 30,000
34 Serok sampah plat Buah 18,000
35 Sikat keramik/lantai Buah 43,000
36 Sulak Bulu Buah 20,000
37 Keranjang Sampah Plastik Besar Buah 32,000
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
62
NO NAMA BARANG SATUAN HARGA
2
Axi Besar
Axi Besar Refil
Bayfres Spray Besar
KETERANGAN
(MERK/BAHAN)
9
1 3 4 5
38 Keranjang Sampah Plastik Sedang Buah 20,000
39 Kamper Besar Buah 26,000 Swallow, Toilet
40 Kapur Barus Kg 75,000 Swallow 1 kg
41 Kapur Barus Kg 90,000 Apollo
42 Tali Rafia Kg 45,000 1 kg
43 Tisu basah Buah 23,000 Cussons
44 Tisu Buah 17,000 Paseo, 50 lembar
45 Tisu gulung Rol 12,000
46 Tempat Tisu Buah 24,000
47 Calmic Pengharum Ruangan Otomatis Buah 94,000
48 Pengharum mobil Botol 35,000 Glade
49 Stella matic set 88,000
50 Stella Car parfum musk Botol 30,000
51 Ambhipur mobil Botol 55,000
52 Stella AC lemon Buah 14,700
53 Jas Hujan Buah 105,000
54 Payung Buah 50,000
55 Payung jumbo Buah 90,000
56 Payung lipat Buah 65,000
57 pembersih kaca Buah 18,000 500 ml
58 Sikat WC Buah 15,000
59 Sikat WC Bulat Buah 26,000
60 Buah 70,000
61 Keranjang 70,000
62 Buah 600,000
63 Buah 1,100,000
64 Buah 2,000,000
65 Bunga Meja Kecil Buah 234,000
66 Bunga Meja Besar Buah 585,000
67 Dos 12,300
68 Meter 41,000
69 Rol 385,000 1 (satu) roll
70 Batu Battery :
- Batu Battery Kecil Buah 4,000 Panasonic
- Batu Battery Tanggung Buah 6,400 Panasonic
- Batu Battery Besar Buah 9,400 Panasonic
- Batu Battery A3 Pasang 17,000 Alkaline
- Batu Battery A2 Pasang 17,000 Alkaline
- Batu Battery Kotak 9 V Buah 24,000 Alkaline
71 Bendera Merah Putih :
- Ukuran 270 x 180 cm Buah 175,000
- Ukuran 180 x 120 cm Buah 118,000
- Ukuran 135 x 90 Cm Buah 65,000
- Ukuran 90 x 60 Cm Buah 47,000
72 Bola Lampu dan Alat Listrik :
- 5 watt /220 volt Buah 15,800 Philips (pijar)
- 10 watt/220 volt Buah 19,300 Philips (pijar)
- 15 watt/220 volt Buah 15,800 Philips (pijar)
- 15 watt/220 volt Buah 10,000 Dop (pijar)
- 25 watt/220 volt Buah 20,500 Philips (pijar)
- 40 watt/220 volt Buah 20,500 Philips (pijar)
- 60 watt/220 volt Buah 20,500 Philips (pijar)
- 75 watt/220 volt Buah 20,500 Philips (pijar)
- 100 watt/220 volt Buah 20,500 Philips (pijar)
- 150 watt/220 volt Buah 25,000 Chiyoda
- 200 watt/220 volt Buah 37,000 Visicom
- TL 10 watt/220 volt Buah 19,300 Philips (Lifemax)
- TL 15 watt/220 volt Buah 20,500 Philips (Lifemax)
- TL 18 watt/220 volt Buah 20,500 Philips (Lifemax)
- TL 18 watt/220 volt Buah 62,000 TLD SUPER 80
- TL 20 watt/220 volt Buah 22,300 Philips (Lifemax)
- TL 36 watt/220 volt Buah 41,000 TLD SUPER 80
- TL 36 watt/220 volt Buah 124,200 TLD SUPER 90
- TL 36 watt/220 volt Buah 25,800 Philips (Lifemax)
- SLE 5 Watt/220 volt Buah 48,000 Philips
- SLE 8 Watt/220 volt Buah 56,800 Philips
Karangan Bunga Besar
Lilin
Tali Bendera
Plastik Roll
Bunga hias
Harga bunga fluktuatif sesuai
harga pasar dan masa panen*
Bunga Keranjang/tabur
Karangan Bunga kecil
Karangan Bunga sedang
2
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
10
1 3 4 5
- SLE 14 Watt/220 volt Buah 74,000 Philips
- SLED 18 Watt/220 volt Buah 106,000 Philips
- SLED 23 Watt/220 volt Buah 148,300 Philips
- Lampu PLC 11W Buah 56,200 Philips
- Lampu PLC 14W Buah 59,700 Philips
- Lampu PLC 18W Buah 62,000 Philips
- Lampu PLC 23W Buah 68,000 Philips
- Lampu PLC 11W Buah 38,600 Dop
- Lampu PLC 15W Buah 49,200 Dop
- Lampu TND 12W Buah 67,300 Philips
- Lampu TND 15W Buah 73,200 Philips
- Lampu TND 20W Buah 74,300 Philips
- Lampu TND 24W Buah 82,500 Philips
- Mercury HPLN 80 Buah 58,500 Philips
- Mercury HPLN 250 Buah 86,500 Philips
- Mercury ML 100 WES Buah 68,000 Philips
- Mercury ML 160 WES Buah 75,000 Philips
- Mercury ML 250 WES Buah 78,000 Philips
- Mercury ML 250 ES 5G Buah 85,000 Philips
- Mercury ML 500 ES HG Buah 120,000 Philips
- Balast BSN 250 W Buah 290,000
- Balast BSN 150 W Buah 220,000
- Balast BHL 250 W Buah 250,000
- Balast BHL 125 W Buah 155,300
- Balast TL 20W Buah 85,000 Philips
- Balast TL 40W Buah 85,000 Philips
- Fotol call 6A Buah 150,000 Selcon
- Alcoa Connector buah 9,000
- Sekring otomatis 10A meet unit 60,000 Augen
- Ignitor SN 58 Buah 60,000 Philips
- Capasitor 20 Buah 55,000
- Box Panel 20 x 50 x60 Buah 685,000
- Boks Sekring unit 55,000 Broco
- Boks MCB (Presto) 4 Grop unit 53,000 Broco
- Box/Kap Lampu TL 40W Philips buah 55,000
- Magnetic contractor/ MC SK 32 A Buah 175,000
- Halogen Lamp 1000 watt Buah 59,000 Philips
- Emergenci Lamp C Mos Buah 210,000
- Lampu TL 10Watt/220 Volt Buah 18,000
- Lampu TL 20 Watt/220 Volt / 18W Buah 275,000
- Lampu TL 40 Watt/220 Volt / 36W Buah 135,000 Philip komplit
- Stater TL 20/40 volt Buah 9,400 Philips
- Travo 18 W Buah 65,000 Philips
- Travo 36 W Buah 65,000 Philips
- Lampu HPL 250 W Buah 92,000 Philips
- Lampu HPL 125 W Buah 55,000 Philips
- Lampu SON T 250 W Buah 145,000 Philips
- Lampu SON T 150 W Buah 125,500 Philips
- Lampu Emergency LED Buah 158,500 Hannocks 12 W
- Lampu Emergency LED Buah 110,000 Amasco 10 W
- Lampu Emergency LED Buah 128,000 Luby 8 W
- Lampu Emergency LED Buah 120,000 Hannocks 8 W
- Lampu Emergency LED Buah 134,000 Racer
- Travo BHL 250 W Buah 280,000 Philips
- Travo BHL 125 W Buah 188,500 Philips
- Travo BSN 250 Buah 300,000 Philips
- Travo BSN 150 Buah 262,500 Philips
- Ignitor Buah 85,000 Philips
- Capasitor 32 Uf Buah 75,000 Icar
- Fiting WD E 40 Buah 36,000 keramik
- Fiting E 40 Goliat Buah 46,000
- Fiting WD E 27 Buah 19,000 keramik
- Fiting duduk buah 4,800
- Fiting Gantung buah 6,000
- Saklar Tunggal Inbow buah 19,000 Broco
- Saklar Tunggal Outbow buah 23,000 Broco
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
11
1 3 4 5
- Saklar Ganda Inbow buah 23,000 Broco
- Saklar Ganda Outbow buah 27,000 Broco
- Stop kontak Inbow buah 22,000 Broco
- Stop kontak outbow buah 22,000 Broco
- Kap Housing 250/400 W Buah 3,000,000 Philips
- Kap Housing 100/150 W Buah 2,500,000
- Kap Housing Contempo RVP 350 Buah 1,700,000 Philips
- Kap Housing 125 W Buah 2,600,000 Philips
- Kap Housing SONT 150W PP 166 Buah 2,200,000 Philips
- Kabel NYM 2 x 2,5 mm meter 16,000 Eterna/SPLN
- Kabel NYY 2 x 4 mm meter 30,000 Eterna/SPLN
- Kabel DX 2 x 10 meter 8,000 Eterna/SPLN
- Kabel DX 2 x 16 meter 18,000 Eterna/SPLN
- Kabel NYA 1 x 2,5 mm meter 8,000 Eterna/SPLN
- Kabel NYY 4 x 6 mm meter 50,000 supreme
- Kabel NYY 3 x 6 mm meter 43,000 Eterna
- Kabel NYY 4 x 4 mm meter 42,000 Eterna
- Kabel NYY 4 x 2,5 mm meter 38,500 Eterna
- Kabel NYY 3 x 2,5 mm meter 35,800 Eterna
- Kabel NYM 4 x 6 mm meter 49,300 Eterna
- Kabel NYM 4 x 4 mm meter 34,300
- Kabel NYM 4 x 2,5 mm meter 22,500 Eterna
- Kabel NYM 3 x 2,5 mm meter 21,500 supreme
- Kabel NYM 2 x 1,5 mm meter 12,300 supreme
- Kabel NYAF 1 x 14 x 0,5 mm/1 X 16 meter 35,400 supreme
- Kabel NYA 1,5 mm meter 6,000
- Kabel BC 1 x 6 mm meter 15,500
- Kabel NYAF meter 6,500 supreme 1x2,5 mm
- Kabel NYAF meter 22,500 Eterna 1x10 mm
- Besi ground Rod batang 31,600 10 mm
- Besi ground Rod 25 mm batang 46,000 12 mm
- Begel kg 25,700 pasang
- Fleksibel PVC meter 18,000
- Pipa Spiral meter 8,000
- Kabel Rol Meter 9 Meter unit 120,000 Yunior
- Kabel Rol Meter 10 Meter unit 135,000 Yunior
- Kabel Rol Meter 15 Meter unit 150,000 Yunior
- Pipa Paralon buah 14,000 5/8 inch PVC - 4 meter
- Pipa Paralon buah 33,000 1/2 inch PVC - 4 meter
- Pipa Paralon buah 26,000 3/4 inch PVC - 4 meter
- Pipa Paralon buah 51,000 1 inch PVC - 4 meter
- Invoring buah 14,000
- Terminal deret 16 mm buah 46,000
- Rel terminal buah 33,000
- Patron Zekering buah 10,500
- Kop Zekering buah 11,700
- Elemen Zekering buah 23,500
- Patron Zekering Otomatis buah 30,300 Fukuta
- MC SK 25 A / 18A buah 380,300 Himel
- MC SN 25 buah 365,000 Mitsubishi
- MC SK 32 A buah 765,000 Himel
- MC SN 35 Buah 474,300 Mitsubishi
- MCB 2 A buah 85,000 MG
- MCB 2 A buah 110,000 Scheinider
- MCB 2 A buah 43,000 Himel
- MCB 4 A Buah 43,000 Himel
- MCB 4 A Buah 110,000 MG
- MCB 6 A buah 75,000 MG
- MCB 10 A Buah 41,300 Himel
- MCB 10 A Buah 75,000 MG
- MCB 20 A Buah 40,000 Himel
- MCB 20 A Buah 76,000 MG
- MCB 40 A buah 83,600 MG
- MCB 32 A buah 88,000 MG/Scheinider
- MCB 32 A buah 75,000 Likon
- MCB 25 A buah 65,000 Wanda
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
12
1 3 4 5
- MCB 50 A buah 45,000 Shukaku
- MCB 63 A buah 180,000 Scheinider
- Rel MCB meter 55,000
- WG Type Buah 30,000
- Alkua Banded Buah 9,500
- Stang Lampu 2" P 2 m Batang 300,000
- Stang Lampu 2" P 3 m Batang 332,000
- Terminal Socet Buah 26,800 Uticon
- Isolasi Besar rol 11,700 Unibel
- Isolasi Ruber tape 3M / Templek rol 82,500 3M Scotch Tape
- Foto Sell 10 A Buah 76,000 TAB
- Foto Sell 10 A Buah 170,000 Selcon/HTC
- Foto Sell 6 A Buah 160,000 Selcon/HTC
- Foto Sell 4 A Buah 82,000 HTC
- Kap Gantung Buah 17,000 TAB
- Stainless Steel Clamp meter 11,000
- Pilot Lamp buah 22,500
- Doradoos Buah 28,000 Kotak 10 cm
- T doos buah 6,000 putih
- Cross doos buah 6,000
- In Bow Doos buah 4,000 kotak
- Roset buah 2,700
- Meet Tester buah 70,000
- Tang Kombinasi Lancip buah 56,000 Tenka
- Tang Kombinasi Biasa buah 70,000 Tenka
- Tang Potong Biasa buah 69,000 Tekiro
- Tang Ampere Snep 9 buah 1,500,000
- Multi Meter buah 135,000 spardio
- Solder buah 65,000 winer
- Sabuk Pengaman buah 1,280,000
- Tangga Aluminium 2 x 4 m buah 1,700,000
- Tangga Besi Aluminium 3 m buah 900,000
- Tangga Aluminium 5 m buah 2,500,000
- Obeng - buah 55,000 Tenko
- Obeng + buah 75,000 Tenko
- Test Pen buah 19,000 Augen/Kiso
- Tes Pen Panjang buah 38,500 Likon
- Off Fuse buah 75,000
73 Jam Dinding/Jam Tempel :
a. SEIKO QXA - 020 buah 487,000
b. SEIKO QXL-020 buah 705,000
c. SEIKO QXH - 056 buah 2,700,000
d. SEIKO QXM - 209 buah 2,100,000
74 Jam Duduk/Jam Meja :
a. SEIKO QXW - 207 buah 1,800,000
b. SEIKO QXJ - 018 buah 1,500,000
75 AIR CONDITIONER :
a. Organik (Split) :
- Panasonic 1/2 PK Unit 3,700,000
- Panasonic 3/4 PK Unit 3,900,000
- Panasonic 1 PK Unit 5,700,000
b. Super Ionizer (Split) :
- Panasonic 3/4 PK Unit 5,900,000
- Panasonic 1 PK Unit 6,100,000
- Panasonic 1 1/2 PK Unit 6,800,000
- Panasonic 2 PK Unit 12,260,000
- Panasonic 2 1/2 PK Unit 13,440,000
c. Oxygen Shower (Split) inventer :
- Panasonic 1 PK Unit 7,000,000
- Panasonic 1 1/2 PK Unit 8,000,000
d. Standart (Split) :
- Panasonic 1 PK Unit 4,542,000
- Panasonic 1 1/2 PK Unit 5,200,000
- Panasonic 2 PK Unit 7,500,000
- Panasonic 2 1/2 PK Unit 16,200,000
- Panasonic 3 PK Unit 20,950,000
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
13
1 3 4 5
- LG 518 3/4 PK Unit 4,340,000 dual eco interver
- LG 509LG2 1 PK Unit 4,600,000 dual eco interver
- LG 507 2 PK Unit 7,350,000 T19EV3 interver
- LG Seri NLA 3/4 PK Unit 4,340,000
- LG Seri NLA 1 PK Unit 4,230,000
- LG Seri NLA 2 PK Unit 7,000,000
- Samsung 2 PK Unit 8,400,000
e. Portable :
- Amcor 10.000 BTU Unit 7,000,000
- Edgestar 10.000 BTU Unit 6,250,000
- Sharp 3 PK Unit 15,500,000
76 Ongkos Pasang AC :
- 1/2 PK Unit 270,000
- 3/4 PK Unit 270,000
- 1 PK Unit 270,000
- 1 1/2 PK Unit 375,000
- 2 PK Unit 375,000
- 2 1/2 Unit 375,000
77 KIPAS ANGIN :
- Panasonic - F - EC 234 Unit 440,000
- Panasonic - F - EK 306 Unit 557,000
- Panasonic - F - EE 304 Unit 440,000
- Panasonic - F - ER 303 Unit 546,000
- Panasonic - F - EU 309 Unit 620,000
- Panasonic - F - EU 409 Unit 603,000
- Panasonic - F - EY 1511 W Unit 1,100,000
- Panasonic - F - EY 149 Unit 658,000
- Panasonic - F - EP 404 Unit 815,000
- Panasonic - F - EP 405 Unit 760,000
78 VENTILASI :
- Panasonic - FV - 25 TGU Unit 525,000
- Panasonic - FV - 25 WFU Unit 440,000
- Panasonic - FV - 25 RUNS Unit 573,000
- Panasonic - FV - 30 VHU Unit 493,000
- Panasonic - FV - 30 RUNS Unit 623,000
- Panasonic - FV - 40 AFU Unit 985,000
79 ELEKTRIK FAN :
- Sanyo - EF - J12 NKK Unit 557,000
- Sanyo - EF - J16 ECK Unit 890,000
- Sanyo - EF - J16 HFSK Unit 835,000
- Sanyo - EF - J16 HKK Unit 824,000
- Sanyo - EF - J12 NTB Unit 557,000
- Sanyo - EF - J12 NTB/DV Unit 632,000
- Sanyo - EK - J20 RK/DV Unit 546,000
- Sanyo - EK - J25 RK/DV Unit 567,000
- Sanyo - EK - J30 RK/DV Unit 702,000
80 REFRIGERATOR / ALMARI ES :
- 1 pintu 50 liter Unit 2,410,000 Panasonic, Sanyo D187
- 1 pintu, 155 liter Unit 2,356,000
- 1 pintu, 155 liter Unit 1,928,000 panasonic nr-af17an
- 1 pintu, 160 liter Unit 2,785,000 polytron
- 1 pintu, 185 liter Unit 2,785,000 Sharp, Polytron 15AG
- 1 pintu, 205 liter Unit 3,374,000 Sharp kirei
- 1 pintu, 220 liter Unit 3,535,000 Polytron 16AGRN
- 2 pintu, 220 liter Unit 4,125,000 Panasonic 229NF
Unit 5,500,000 Panasonic NR BB258
- 2 pintu, 333 liter (Semi Freezer) Unit 7,280,000 Panasonic
- 2 pintu, 450 liter (Semi Freezer) Unit 8,150,000 Modena
- 2 pintu, 497 liter Unit 12,158,000 Samsung
- 2 pintu, 551 liter Unit 12,854,000 Sharp
- 2 pintu, 602 liter Unit 16,925,000 Samsung
- 3 pintu, 585 liter Unit 19,549,000 LG
- 4 pintu, 532 liter Unit 20,888,000 mitsubishi
- 2 pintu, 472 liter NR-D471NCGB Unit 35,350,000 LG
- 6 pintu, 530 liter Unit 54,600,000 Panasonic
81 FREEZER 6 Rak Unit 3,535,000 Panasonic
- 2 pintu, 250 liter
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
14
1 3 4 5
82 MESIN CUCI :
- Panasonic Unit 2,410,000 2 tabung, 7 kg
- Panasonic Unit 3,535,000 1 tabung, 7 kg
- Samsung Unit 3,802,000 1 tabung, 7 kg
- Akira Unit 5,034,000 1 tabung, 7 kg
83 POMPA AIR :
- 125 watt buah 815,000 Panasonic
- 125 watt buah 685,500 Panasonic 129 JX
- 125 watt buah 700,000 Szimitsu PS - 128 BIT
- 125 watt buah 745,000 Sanyo PH 137 A
- 200 watt buah 964,000 Panasonic GP 200 JXK
- 250 watt / jetpump buah 4,805,000 Sanyo PDS 255 A
- Pompa air 400 watt/ jetpump buah 1,850,000 Shimizu
- Pompa air 400 watt/ jetpump buah 9,748,000 Sanyo PH. 408 SP
84 WIRELLES :
- TOA ZW 3200 Unit 8,400,000 2 Channel + Tape
- TOA ZW G 800 7,145,000
- TOA ZW G.810 CU Unit 9,426,000
85 AMPLIFIER :
- TOA ZA - 2120/120W Unit 2,945,000
- TOA ZA - 2060/60 W Unit 2,410,000
86
Unit 2,517,000 Sharp 24"
Unit 1,980,000 Sharp 24"
Unit 2,785,000 Sharp 32"
Unit 3,320,000 Sharp 32"
Unit 2,250,000 Sharp 24"
Unit 2,035,000 Polytron 20"
Unit 2,250,000 Polytron 22"
Unit 1,820,000 Polytron 22"
Unit 2,800,000 Polytron 24"
Unit 3,630,000 Polytron 32"
Unit 3,613,000 Polytron 32"
Unit 2,250,000 Polytron 20"
Unit 2,570,000 Panasonic 32"
Unit 3,385,000 Panasonic 32"
Unit 4,800,000 Panasonic 40"
Unit 2,500,000 LG 22"
Unit 2,693,000 LG 24"
Unit 3,513,000 LG 32"
C. BARANG CETAKAN
Harga Termasuk Pajak
1 3 4 5
1 Amplop besar putih berkop Dos 100,000 HVS putih 80 gr ; 35x25 cm
2 Amplop panjang coklat berkop : Coklat Muda (kassing)
- ukuran kantong Dos 60,000 41 x 31 cm
- ukuran folio/map Dos 95,000 35 x 25 cm
- ukuran 1/2 folio Dos 85,000 28 x 18 cm
- ukuran 1/4 folio Dos 70,000 28 x 14 cm
3 Berita Acara pemeriksaan kas Buku 50,000 70 gr folio @ 100 lb
4 Blangko daftar hadir pegawai Lembar 375 HVS putih 70 gr
5 Blangko berkop Rim 150,000 HVS 70 gr, folio 1 muka
6 Blangko Nota Dinas HVS Rim 150,000 - sda -
7 Blangko Nota Dorslag Rim 150,000 Dorslag folio 1 muka/HVS
8 Blangko daftar pengantar SPP(Bend 1) Rim 150,000 HVS 70 gr folio 1 muka
9 Blangko SPP beban tetap (Bend 2) Rim 150,000 - sda -/70
10 Blangko SPP, UUDP R/P (Bend 3) Rim 150,000 - sda -/70
11 Blangko daftar perincian R/P (Bend 4) Rim 150,000 - sda -/70
Rim 150,000 - sda -/70
13 Blangko penetapan sisa UUDP(Bend 5) Rim 150,000 - sda -/70
14 Blangko penetapan sisa UUDP(Bend 6) Rim 150,000 - sda -/70
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
TV LED :
- Sharp 24" IC 24SA4000I
- Sharp 24" 24LE170
- Sharp 32" 32LE 180
- Sharp 32" 32LE1851
- LG 24" 24MT 48
- LG 32" 32 LJ500
- Polytron 32" 32 D 7 11/y
- Polytron 20" 20 d 9 5A
- Panasonic 22" 22E 30 2G
- Panasonic 32" 32E 30 2G
- Panasonic 40" 40D 32G
- LG 22" 22MT 48
- Sharp 24" 24LE 175
- Polytron 20" 20 DDA/y
- Polytron 22" 22 D 11 50
- Polytron 22" 22 D 11 0
- Polytron 24" 24D 85 20
- Polytron 32" 32D 55 2
KETERANGAN
(MERK/BAHAN)
2
12 Blangko lampiran SPP belanja rutin non
Pegawai (Bend 4 a)
NO NAMA BARANG SATUAN HARGA
15
1 3 4 5
15 Blangko surat tanda setor (Bend 17) Rim 150,000 - sda -/70
16 Blangko SPP (Bend 16) Rim 150,000 - sda -/70
17 Blangko SPP (Bend 19) Rim 150,000 - sda -/70
18 Blangko kartu barang (Bend 22) Lembar 3,900 Buffalo jambon, folio
19 Blangko kartu persed.barang (Bend 23) Lembar 3,900 Buffalo putih, folio 1 muka
20 Rim 150,000 HVS 70 gr folio 1 muka
21 Rim 150,000 - sda -/70
22 Blangko laporan triwulanan (Bend 28) Rim 150,000 - sda -/70
23 Blangko Model (Bend 29) Rim 150,000 - sda -/70
24 Blangko mendahului pulang Rim 150,000 - sda -/70
25 Blangko tidak masuk kerja/biru Rim 150,000 - sda -/70
26 Blangko tidak masuk kerja/merah Rim 150,000 - sda -/70
27 Blangko laporan penimbangan Buku 50,000 HVS 70 gr folio @ 100 lb
28 Blangko formulir uji Lembar 375 HVS 70 gr folio
29 Blangko petunjuk pengisian Lembar 375 HVS 70 gr folio
30 Blangko Surat Pemberitahuan Kenaikan Lembar 375 Dorslag folio 1 muka/NCR
31 Gaji Berkala Berkop Lembar 375 HVS 70gr folio
32 Buku 50,000 HVS 70 gr folio isi 100 lb
33 Buku 50,000 - sda -/70
34 Buku 50,000 - sda -/70
35 Blangko CM 16.01.5 Buku 50,000 - sda -/70
36 Blangko ringkasan Riwayat Klinik Buku 16,500 ukuran 16x10 cm HVS/70
37 Blangko Kwarto 2X, 1 muka Lembar 1,200 HVS 70gr
38 Blangko Kwarto 2X, 2 muka Lembar 2,000 HVS 70gr
39 Blangko 2X Folio, 1 muka Lembar 2,000 HVS 70gr
40 Blangko Folio 2 X, 2 muka Lembar 4,000 HVS 70gr
41 Lembar 700 min 20.000 lembar
42 Blangko Surat Pemberitauan ( SPT) Lembar 375 HVS 70 gr 1 muka
43 Blangko Panggilan Lembar 375 - sda -/70
44 Blangko Surat Peringatan Lembar 375 - sda -/70
45 Stop Map Kertas BC Warna Lembar 4,500
46 Stop Map kertas HVO Warna Lembar 3,000
47 Blangko Disetor Kpd Bend.Penerima Buku 50,000 HVS 70 gr @ 100 lb
48 Blangko Lap.Harian Penetapan PKB/BBNKB Buku 50,000 HVS 70 gr @ 100 lb
49 Blangko Fiskal Daerah Buku 50,000 - sda -/70
50 Blangko Fiskal Antar Daerah Buku 50,000 - sda -/70
51 Blangko Surat Teguran Buku 50,000 - sda -/70
52 Blangko Surat Tagihan Pajak Daerah Buku 50,000 - sda -/70
53 Buku 90,000 HVS 70 gr HVS folio/NCR
54 Buku 90,000 HVS 70 gr HVS folio/NCR
55 Buku 90,000 HVS 70 gr HVS folio/NCR
56 Buku Penelitian Ulang Buku 150,000 HVS 70 gr
57 Buku Rekapitulasi Buku 150,000 HVS 70 gr
58 Buku Rekapitulasi NCR Buku 150,000
59 Buku Kas Umum ( Bend.10 ) NCR Buku 110,000 6 rangkap
60 Buku Penerimaan Sejenis ( Bend.16 ) Buku 50,000 HVS 70 gr folio @ 100 lb
61 Buku Penerimaan Sejenis ( Bend.16 ) Buku 105,500 HVS 70 gr folio NCR
62 Buku Pakai Habis ( Bend.19 ) Buku 105,500 - sda -/NCR
63 Buku Pengadaan Barang ( Bend.20) Buku 105,500 - sda -/NCR
64 Buku Penerimaan Barang ( Bend.21 ) Buku 105,500 - sda -/NCR
65 Buku Pengeluaran Barang ( Bend.21a ) Buku 105,500 - sda -/NCR
66 Buku Tanda Bukti Penerimaan (Bend26) Buku 105,500 - sda -/NCR
67 Buku 50,000 NCR 1/2 Folio, 5 x 50 lembar
68 Buku Kas Penerimaan ( Bend.27) Buku 50,000 - sda -
69 Buku Permintaan ATK Buku 50,000 HVS 70 gr 23,5 x 21,5 cm
70 Buku Permintaan BC Buku 50,000 - sda -
71 Buku Permintaan perbaikan Buku 50,000 - sda -
72 Buku Surat Pas Kayu Buku 105,500 NCR 1/2 Folio, 5 x 50 lembar
Blangko surat Pendaftaran dan Pendataan
Kendaraan Bermotor (SPPKB)
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
Blangko pengesahan STNK dan
Pembayaran PKB/SWDKIIJ
Buku Tanda Bukti Pengeluaran (Bend.26a)
Blangko Surat Ketetapan Pajak Daerah
Lebih Bayar (SKPDLB)
Blangko Surat Ketetapan Pajak Daerah
Kurang Bayar (DKPDKB)
Blangko pen/pel UUDP rutin/proyek
(Bend.25)
Blangko Satus Pasien Rawap Inap
2
Blangko Status pasien RSU/Bagian
Kebidanan
Blangko Status Pasien RSU Bagian
Genekologi
Blangko perincian pen/pel proyek/rutin
(Bend.24)
16
1 3 4 5
73 Buku 105,500 - sda -
74 Buku 105,500 - sda -
75 Buku Kwitansi Uang Kas Buku 105,500 - sda -
76 Buku Register Penutup Kas Buku 105,500 - sda -
77 Buku agenda surat masuk/keluar Buku 40,000 HVS 70gr, folio @50 hlm, bolak
balik jilid lengkap
78 Buku Register Akta : uk :39,5x28 cm 50 lb
- Kelahiran Buku 99,000 continues form
- Kematian Buku 99,000
- Perceraian Buku 99,000
- Perkawinan Buku 99,000
- Serbaguna Buku 99,000
79 Buku Register Akta :
- Perkawinan Buku 54,000
- Perceraian Buku 54,000
- Pengakuan Anak Buku 54,000
- Pengesahan Anak Buku 54,000
80 Buku Album Raport SD Buku 60,500 isi plastik
81 Buku Rapor SMA/SMP uk. 42 x 28 cm Buku 30,000 HVS 70 grm
82 Buku Induk SMP/SMA uk. 35 x 27 cm Buku 130,000 HVS 70 grm
83 Buku Kajian Inovasi Pelayanan Buku 65,000
84 Buku Leger SMA/SMP uk. Folio HVS Buku 55,000 HVS 70 grm
85 Album Raport SMA/ SMP Buku 60,000 Isi Plastik
86 Sampul Plastik Raport SMA / SMP Buah 35,000
87 Bukti Setoran Parkir Buku 16,500 HVS 60 gr dorslag 1/3 fl @ 100
lbr
88 Buku Data Perkembangan Penduduk Buku 55,000
89 Bukti Setoran Parkir Buku 15,000 HVS 60 gr dorslag 1/3 fl @ 50
lbr
90 Buku 100,000 Kundruks 85 gr 1/2 fl, cover
finil, hot print
91 Buku Kerja / Agenda Tebal Buku 150,000 Kundruks 85 gr 1/2 fl, cover
vinil, hot print
92 Buku Nota Penjualan Karcis Buku 18,500 NCR 1/3 folio, @ 3 x 50 lbr
underground
93 Buku Nota Penjualan Buku 18,500 NCR 1/3 folio, @ 3 x 50 lbr
underground
94 Buku Resep Dokter Buku 11,700 HVS 16x10 cm @ 100 lbr
95 Buku Referensi Buku 20,000 uk.1/2 folio HVS 100 lbr, cover
BC
96 Buku Referensi Buku 20,000 uk.1/2 folio CD, cover BC
97 Buku Profil Perkembangan Kependudukan Buku 150,000
98 Buku Catatan Penelitian PNS Buku 20,000 uk.21 x 16 cm HVS 70 gr
99 Buku 75,000 NCR @ 4 x 50 lb
100 Blocknote berkop Buku 50,000 HVS 70 gr, folio @ 100 lb
101 Catatan Dokter untuk pengobatan Buku 50,000 uk. 31 x 21, 5 cm HVS 70gr,
BC
102 Cover lambang Kulon Progo lengkap Lembar 150,000 kertas mirorkote, 2 x folio,
lambang warna
103 Daftar Perincian Penghasilan pegawai Lembar 375 uk.folio HVS 70 gr.
104 Daftar Penghasilan Pegawai PPh Lembar 375 uk.folio HVS 70 gr.
105 Daftar Penerimaan untuk Lamp.Bend.26 Buku 45,000 NCR 1/2 folio @ 5 x 50 lb
106 Grafika dan hasil pemeriksaan :
a. Unit Penyakit Anak Lembar 5,200 uk.35x32cm kertas BC pth
b. Unit Penyakit Dalam Lembar 5,200 uk.35x32cm kertas BC pth
107 Karcis Pasar Buku 9,000 uk. 6 x 10 cm HVS 60 gr @ 100
lb
108 Karcis Sepeda Motor/Mobil/Truk Buku 23,100 uk.15x15cm HVS 60 gr @100 lb
109 Karcis Bus Perkotaan Buku 10,500 uk.18x8 HVS 60gr @100lb
110 Karcis Penjaja Ideran Buku 8,400 uk.15x5 HVS 60gr @100lb
111 Karcis Parkir Buku 10,000 uk.15x5 HVS 70gr @100lb (2
warna*)
Buku Lap. Pemeriksaan (Inventarisasi)
Jenis dan Magasatwa Buruan
Buku Lampiran Permohonan mengganti
biaya pengadaan hasil hutan
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
Bon Pengganti Biaya pengadaan hasil
hutan
Buku Kerja / Agenda Sedang
17
1 3 4 5
112 Karcis Sewa Kios Buku 7,000 uk.5x10 CD @100lb
113 Karcis Peron Buku 7,000 uk.5x10 CD @100lb
114 Karcis Kendaraan Menginap Buku 8,250 uk.16x5 HVS 70 gr@100lb
115 Kwitansi Laboratorium Buku 24,200 uk.21x9 cm HVS pth 70 gr @
200 lb
116 Kwitansi Pembayaran Akta Kelahiran Buku 40,700
117 Kwitansi Pembayaran Akta Kematian Buku 40,700
118 Kwitansi Radiologi Buku 15,000 uk.21x9 cm HVS pth 70 gr
119 Kartu Berobat Lembar 750 uk.10x8cm kertas BC kng
120 Rekam Medis/RM (MAP) lembar 7,000 IVORI.230 gr
121 Rekam Medis/RM (MAP) Full Color lembar 10,000 IVORI.319 gr
122 Kartu Pengunjung dgn kantong plastik set 3,500 plastik/ kertas BC
123 Kartu register Kendaraan Lembar 3,000 BC, 21x30 cm satu muka
124 Expl 22,300 uk.47x31,5 cm HVS 70gr 12 lb
@13 lb
125 Kalender dinding dengan foto Expl 60,000 uk.47x31,5 cm HVS 70gr 12 lb
@13 lb
126 Kalender meja biasa Expl 75,000 uk. 16 x 20 cm, Spiral
127 Kalender meja dengan foto/kegiatan Expl 80,000 uk. 16 x 20 cm, Spiral
128 Laporan Pajak-pajak Pribadi (LP2P) :
- Lembar 350 uk. Folio HVS 70 gr
- Lembar II utk Wajib LP2P. Lembar 350 uk. Folio HVS 70 gr
-Lembar III utk Petunjuk Pengisian
Tanda Terima LP2PLembar 1,200 uk. Folio HVS 70 gr bolak balik
130 Buku 90,000 uk. Folio HVS 70 gr, @ 4 x 50 lb
(NCR)
131 Buku 90,000 uk. Folio HVS 70 gr, @ 4 x 50 lb
(NCR)
132 Penempelan hasil pemeriksaan Lembar 350 HVS 70 gr, 1/2 folio
133 Buah 20,000 uk. Folio kertas linen tebal
cetak 7x, warna
134 Piagam Melati I Lembar 2,500 Uk.21 x 16 cm HVS 70gr
135 Piagam Melati II Lembar 6,600 Linen tebal, 2 x folio
Underground
136 Piagam Melati III Lembar 25,000 Lambang Berwarna
137 Piagam Melati Persiapan Lembar 25,000 Lambang Berwarna
138 Stiker Lembar 2,500 Uk.5x5 cm Kertas Stiker
139 Sampul Piagam Lembar 6,000 Bufallo, Ivory, Folio
140 Rim 1,250,000 A.P.150 gr/Cetak Bolak Balik
141 Sampul SPJ Jambon/Kuning Lembar 6,000 Uk.2xFolio, BC Berwarna
142 Status Pasien RSU Buku 5,000 HVS 70 gr quarto @15 lb
143 Surat Keterangan Dokter Buku 16,250 HVS 70 gr,1/2 Folio @100lb
144 Kutipan Akta Lembar 6,000
145 Buku Register Pasien Puskesmas Buku 50,000 HVS 70 gr (per 100 *)
146 Disposisi pendaftaran akta kelahiran Buku 9,500 uk 1/4 HVS
147 Formulir Pencatatan sipil Rim 150,000 HVS 70 gr/folio
148 Rim 150,000 HVS 70 gr/folio
149 Rim 150,000 HVS 70 gr/folio
150 Rim 150,000 HVS 70 gr/folio
151 Rim 150,000 HVS 70 gr/folio
152 Formulir Permohonan KIA Rim 150,000 HVS 70 gr/folio
153 Rim 150,000 HVS 70 gr/folio
154 Blanko Kutipan Akta Kelahiran lembar 5,500 security watermark, polos
dengan lambang garuda
155 Blanko Kutipan Akta Kematian lembar 5,500 security watermark, polos
dengan lambang garuda
156 Buku Register Akta Kelahiran buah 110,000 HVS (woodfee paper) 100 gr/m2,
isi : 100 hlm157 Buku Register Akta Kematian buah 110,000 HVS (woodfee paper) 100 gr/m
2,
isi : 100 hlm
Lembar I utk Pimpinan
departemen/lembaga
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
Cetak Brosur/Leaflet/Colour Bolak Balik
Kalender Besar dengan lambang Kulon
Progo lengkap.
Laporan realisasi penerimaan denda
pelanggaran TU, IHH & DR (LRPD)
Permohonan mengganti biaya pengadaan
hasil hutan
Formulir Permohonan masuk penduduk
Formulir Permohonan Perubahan Data
Piagam/Sertifikat/Tanda Penghargaan
Lambang Kulon Progo lengkap
Formulir Permohonan masuk
penduduk/terlambat
Formulir Permohonan masuk
penduduk/Aktivasi
Formulir Permohonan pindah keluar
penduduk
18
1 3 4 5
158 Blangko Kutipan Akta Perkawinan lembar 5,500 security watermark, polos
dengan lambang garuda
159 Blangko Kutipan Akta Perceraian lembar 5,500 security watermark, polos
dengan lambang garuda
160 lembar 5,500 security watermark, polos
dengan lambang garuda
161 lembar 5,500 security watermark, polos
dengan lambang garuda
162 Buku Register Akta Perkawinan buah 110,000 HVS (woodfee paper) 100 gr/m2,
isi : 100 hlm163 Buku Register Akta Perceraian buah 110,000 HVS (woodfee paper) 100 gr/m
2,
isi : 100 hlm164 Buku Register Akta Pengakuan Anak buah 110,000 HVS (woodfee paper) 100 gr/m
2,
isi : 100 hlm165 Buku Register Akta Pengesahan Anak buah 100,000 HVS (woodfee paper) 100 gr/m
2,
isi : 100 hlm166 Buku data agregat Buku 165,000 HVS 80 gr/kuarto
167 Surat Keterangan Kesehatan Buku 20,000 HVS 70 gr uk.21x10 cm (per
100*)
168 Surat Keterangan Kelahiran Buku 20,000 HVS 70 gr,1/2 Folio @100lb
169 Surat Pemberitauan SPT Lembar 375 HVS 70 gr Folio
170 Sticker Ijin Spanduk Lembar 8,500 uk.19x14 cm kertas stiker
171 Snelhecter Berkop Buah 7,000 Kertas BC Leces Berwarna
172 Stopmap Berkop Buah 6,000 Kertas BC Leces Berwarna
173 Sarana Kearsipan :
- Kartu Kendali Masuk 4 rangkap. Buku 22,100 NCR 1/4 folio @ 4x50 lb
- Kartu Kendali Masuk 3 rangkap. Buku 15,400 NCR 1/4 folio @ 3x50 lb
- Kartu Kendali Keluar. Buku 15,400 NCR 1/4 folio @ 3x50 lb
- Lembar Disposisi. Buku 21,000 Biasa, 1/2 folio
- Lembar Disposisi. Buku 20,000 NCR 1/2 folio @ 2x50 lb
- Lembar Pengantar. Buku 25,000 NCR 1/2 Quarto @ 2x50 lb
- Lembar Pengantar. Buku 25,000 NCR 1/2 folio @ 2x50 lb
- Lembar Daftar Pengendali. Buku 42,000 HVS 70 gr Folio @ 100 lb
- Folder Buah 4,700
- Label Buah 800
- Sekat Folder Kartu Kendali Lidah I Lembar 1,000 Karton 1/4 folio
- Sekat Folder Kartu Kendali Lidah II Lembar 1,000 Karton 1/4 folio
- Sekat Folder Kartu Kendali Lidah IV Lembar 2,000 BC Jakarta 1/2 folio
- Sekat Tanggal kartu Kendali. Lembar 4,900 Karton 1/2 folio
- Sekat Bulan Lembar Disposisi. Lembar 1,800 BC Jakarta 1/2 folio
- Sekat tanggal Lembar Disposisi. Lembar 1,500 BC Jakarta 1/4 folio
- Sekat Folder Lidah I. Lembar 2,900 Karton 35 x 25 cm
- Sekat Folder Lidah II. Lembar 2,900 Karton 35 x 25 cm
- Sekat Folder Lidah IV. Lembar 2,900 BC Jakarta 36x25 cm
- Kotak Sekat Kartu Kendali Buah 41,200 Karton buffalo 17x12x40cm
- Kotak Lembar Disposisi Buah 30,000 Karton buffalo 18x23x40cm
- Boks arsip Buah 24,000 Karton
- Boks Kartu Kendali Buah 12,500 Marga blok kuning
- Kertas Pemerian/Diskripsi. Rim 65,000 HVS 1/2 folio
- Rotary File Ref.210 Frong tebal 1 cm Lembar 16,500
- Standing File System Ref.24 Lembar 33,000
174 Tikler Filer Buah 40,000 Tripbuf 26 1/2x36 cm
175 Tikler Filer Buah 38,000 Karton 26 1/2x36 cm
176 Berita Acara Pemeriksaan Kas Buku 35,700
177 Surat Ketetapan Pajak Kendaraan Buku 35,700
178 Surat Ketetapan Pajak Kendaraan (MPS) Buku 35,700
179 Foto Copy :
- Foto Copy HVS 60 gr Lembar 275
- Foto Copy HVS 70 gr Lembar 300
- Foto Copy HVS 70 gr (HVS berwarna) Lembar 400
- Foto Copy HVS 80 gr Lembar 400
180 Blangko KK set 5,100
181 Blangko KIA Keping 4,400
182 Blangko SSP 5 rangkap Buku 82,500 NCR
183 Blangko Surat Perintah Perjalanan dinas (SPPD) :
Blangko Kutipan Akta Pengesahan Anak
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
Blangko Kutipan Akta Pengakuan Anak
19
1 3 4 5
- NCR Rim 132,700
- NCR Rangkap 5, folio Buku 79,500
- NCR Rangkap 6, folio Buku 92,000
184 Blangko Laporan Hasil Perjalanan Dinas Rim 132,700 NCR
185 Blangko Surat Tugas Rim 132,700 NCR
186 Blangko Surat Kuasa Rim 98,400
187 Kartu nama :
- Biasa box 67,800
- Plastik lapis box 85,200
- Dengan tinta warna dan logo box 125,000 Full colour
188 Map Akta Perkawinan, Tebal Buku 44,000
189 Map Arsip PNS Buku 198,700 Jilid karton tebal
190 Jilid berkas-berkas (data) :
- Jilid lakban tipis Buku 6,500
- Jilid lakban tebal Buku 12,800
- Jilid sambung biasa tipis Buku 8,500
- Jilid sambung biasa tebal Buku 20,000
- Jilid sambung laminating tipis Buku 25,000
- Jilid sambung laminating tebal Buku 30,000
- Jilid spiral tidak laminating tipis Buku 25,000
- Jilid spiral tidak laminating tebal Buku 35,000
- Jilid binder (spiral laminating tipis) Buku 35,000 Spiral Kawat
- Jilid binder (spiral laminating tebal) Buku 45,000 Spiral Kawat
- Jilid biasa sampul bufalo Buku 40,000
- Jilid karton tebal/ skripsi Buku 50,000
191 Cetak Background Raport Rim 176,000 HVS 80 gr
192 Cetak Background Raport Logo Colour Rim 300,000 HVS 80 gr
193 buku 175,000 Kertas Art Paper, Jilid Hard
Cover full colour
194 Cetak Buku Anggota Perpustakaan Buku 55,000
195 Kartu Anggota Perpustakaan + Plastik Lembar 5,000
196 Blanko SPPT Single Rim 495,000
197 Blanko SPPT Double Rim 715,000
198 Blanko DHKP Rim 660,000
199 Daftar Penerima Harian Buku 85,000
200 Spanduk :
- Spanduk kain warna tua meter 24,000 Kain tetron
- Spanduk kain warna muda meter 19,000 Lebar 90 cm (belum termasuk
tali dan biaya pasang)
- Frontlite meter 20,000
- Backlite meter 65,000
- Sticker Vinyl meter 69,000
- Sticker One Way meter 107,000
- X-Banner buah 120,000 Ukuran 60 x 160 cm
- Roll Banner buah 250,000 Ukuran 60 x 160 cm
- Banner meter 25,000 sudah termasuk desain
finishing
- Baliho meter 198,000
- Baliho meter 460,000 termasuk biaya pasang dan
konstruksi bambu
CATATAN :
1. Untuk Cetakan Blangko-blangko minimal 500 Lembar
2. Harga Dimaksud Untuk Cetakan Satu warna.
D. MEUBELAIR
1. Meubelair Dari Kayu Jati
Harga Termasuk Pajak
1 3 4 5
1 KURSI - KURSI :
- Kursi rapat dengan tangan-2 buah 1,500,000
- Kursi dengan tanganan buah 1,750,000
SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
Cetak buku laporan dewan riset daerah
20
1 3 4 5
- Kursi Baca tanpa tanganan buah 950,000
- Kursi kerja tanpa tanganan-2 buah 1,300,000
- Kursi tanpa tanganan buah 1,300,000
- Kursi Siswa SD buah 750,000
- Kursi Siswa SMP/SMA buah 800,000
- Kursi Guru buah 1,750,000
2 Meja Kursi Tamu Staf, terdiri dari : Set 10,300,000
- 1 buah meja tamu
- 3 buah kursi pendek
- 1 buah kursi sofa panjang
3 Meja Kursi Tamu Pimpinan, terdiri dari: Set 16,500,000
- 1 buah meja tamu
- 3 buah kursi pendek
- 1 buah kursi sofa panjang
4 Dingklik :
- Panjang dengan Sandaran buah 3,700,000
- Bangku Panjang buah 2,970,000
5 Meja :
- Meja Tulis Biro Besar buah 6,400,000
- Meja Tulis Biro Sedang buah 6,100,000
- Meja Tulis Biro Kecil buah 4,600,000
- Meja 1/2 Biro buah 3,250,000
- Meja Rapat Staf buah 4,600,000
- Meja Rapat buah 3,600,000
- Meja Ketik dg laci buah 2,950,000
- Meja Ketik Tanpa laci buah 2,790,000
- Meja Baca Perpustakaan buah 2,630,000
- Meja Siswa SD buah 1,550,000
- Meja Siswa SMP/SMA buah 2,500,000
- Meja Kenap buah 1,570,000
- Meja Guru buah 3,800,000
6 Rak-rak :
- Kayu buah 7,000,000
- Buku buah 8,500,000
- Dixion buah 5,200,000
- Display Kayu buah 2,500,000
7 Almari :
- Almari Arsip Kaca buah 6,400,000
- Almari Arsip kayu buah 6,600,000
- Almari Buku buah 8,700,000
- Almari Arsip kecil buah 5,000,000
- Almari Katalog buah 10,500,000
8 Panel-panel :
- Data buah 5,000,000
- Foto buah 4,880,000
9 Papan Tulis berkaki buah 4,500,000
10 Papan Tulis tidak berkaki buah 3,250,000 Tekwood
11 Papan Tulis White Board berkaki buah 5,000,000
12 Papan Tulis White Board berkaki beroda buah 5,750,000 Dengan roda
2. Meubelair Dari Kayu Akasia ( Orak-Arik )
Harga Termasuk Pajak
1 3 4 5
1 KURSI - KURSI :
- Kursi rapat dengan tangan-2 buah 999,000
- Kursi dengan tanganan buah 1,100,000
- Kursi Baca tanpa tanganan buah 900,000
- Kursi kerja tanpa tanganan-2 buah 910,000
- Kursi tanpa tanganan buah 920,000
- Kursi Siswa SD buah 650,000
- Kursi Siswa SMP/SMA buah 720,000
- Kursi Guru buah 980,000
KETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGA
2
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
21
1 3 4 5
2 Meja Kursi Tamu Staf, terdiri dari : Set 6,500,000
- 1 buah meja tamu
- 3 buah kursi pendek
- 1 buah kursi sofa panjang
3 Meja Kursi Tamu Pimpinan, terdiri dari : Set 8,650,000
- 1 buah meja tamu
- 3 buah kursi pendek
- 1 buah kursi sofa panjang
4 Dingklik :
- Panjang dengan Sandaran buah 2,700,000
- Bangku Panjang buah 2,500,000
5 Meja :
- Meja Tulis Biro Besar buah 5,200,000
- Meja Tulis Biro Sedang buah 4,300,000
- Meja Tulis Biro Kecil buah 3,500,000
- Meja 1/2 Biro buah 2,700,000
- Meja Rapat Staf buah 3,300,000
- Meja Rapat buah 2,650,000
- Meja Ketik dg laci buah 2,600,000
- Meja Ketik Tanpa laci buah 2,450,000
- Meja Baca Perpustakaan buah 2,600,000
- Meja Siswa SD buah 1,200,000
- Meja Siswa SMP/SMA buah 1,300,000
- Meja Kenap buah 1,265,000
- Meja Guru buah 2,650,000
6 Rak-rak :
- Kayu buah 5,520,000
- Buku buah 7,300,000
- Dixion buah 4,600,000
- Rak Display Kaca Arsip Visual buah 1,732,500
- Rak Display Kaca Arsip Tektual buah 1,732,500
7 Almari :
- Almari Arsip Kaca buah 4,900,000
- Almari Arsip kayu buah 5,300,000
- Almari Buku buah 6,950,000
- Almari Arsip kecil buah 4,250,000
- Almari Katalog buah 8,250,000
8 Panel-panel :
- Data buah 4,450,000
- Foto buah 4,200,000
9 Papan Tulis berkaki buah 4,250,000
10 Papan Tulis tidak berkaki buah 2,300,000 Tekwood
11 Papan Tulis White Board berkaki buah 4,700,000
12 Papan Tulis White Board berkaki beroda buah 4,850,000 Dengan roda
13 Papan Nama Instansi berkaki buah 3,410,000
14 Dingklik Bundar Kayu buah 632,000
15 Papan Petunjuk Visual buah 550,000
16 Filling kayu buah 1,390,000
17 Almari arsip sedang buah 2,600,000
18 Almari arsip buku buah 2,500,000
19 Meja dan Kursi Tamu terdiri dari : Set 4,250,000 SIRO FURNITURE
- 3 dudukan (1 buah) Sofa Jasmine
- 1 buah meja tengah
- 1 buah meja sudut
3. Meubelair Pabrikan
Harga Termasuk Pajak
1 3 4 5
1 Kursi Direktur :
- DONALDO DO-16 oscar/fabric buah 4,680,000
- LUFO L 900 oscar/fabric buah 3,795,000
- LUFO L 910 oscar/fabric buah 2,980,500
- LUFO L 930 oscar/fabric buah 3,415,500
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
22
1 3 4 5
- LUFO L 940 oscar/fabric buah 3,895,000
- LUFO L 960 oscar/fabric buah 2,990,000
- LUFO L 970 oscar/fabric buah 3,540,000
buah 2,415,500 ATLANTA
buah 2,495,500 ATLANTA
- AL 101L Genuine Leather buah 5,500,000 ATLANTA
buah 2,300,000 WINNER
buah 5,285,000 ELITE
buah 5,500,000 ELITE
- DD 12 CPT Leather buah 4,800,000 DOROTHY
- DD 13 CPT Leather buah 5,600,000 DOROTHY
- DD 14 CPT Leather buah 5,450,000 DOROTHY
- Chairman EC-8000A buah 3,700,000
- Chairman PC-9910A buah 3,700,000
- Chairman EC-4000BLC buah 6,200,000
- Chairman EC-70LC buah 6,300,000
- Donati Luxor new 1 AL buah 4,000,000
- Donati Manggo 1 AL buah 4,000,000
- Donati DO-10 AL buah 6,200,000
- Donati Luxor new 1 AL Leather buah 6,850,000
- Donati Manggo 1 AL Leather buah 6,900,000
- Ichiko ETIS I-S buah 6,900,000
- Ichiko ETIS II-P buah 6,100,000
- Ichiko Vorque buah 4,100,000
- Ichiko Cozze I-S buah 4,000,000
2 Kursi Executive :
a. Merk Pagoda :
- Swivel Gaslift P/U Arm type 78 VX buah 2,100,000
- Swivel Gaslift P/U Arm type 79 VX buah 2,475,000
- Swivel Gaslift type 96 VX buah 2,265,000
- Swivel Gaslift P/U Arm type 760 VX buah 1,896,500
- Swivel Gaslift P/U Arm type 102 AX buah 2,230,000
- Swivel Gaslift P/U Arm type 110 AX buah 3,127,000
- Swivel Gaslift without Arm 61 buah 1,350,000
- Swivel Gaslift P/U Arm type 909 O buah 5,170,000
- Swivel Gaslift P/U Arm type 910 L buah 6,950,000
- Swivel Gaslift P/U Arm type 910 O buah 4,536,000
- Swivel Gaslift P/U Arm type LD 10 O buah 3,750,000
- Swivel Gaslift P/U Arm type 801 L buah 6,700,000
- Swivel Gaslift P/U Arm type 802 L buah 6,115,000
- Swivel Gaslift P/U Arm type 803 D buah 3,020,000
- Swivel Gaslift P/U Arm type 803 L buah 7,850,000
- Swivel Gaslift P/U Arm type 608 D buah 3,500,000
- Swivel Gaslift P/U Arm type 806 buah 2,445,000
- Swivel Gaslift P/U Arm type 808 buah 2,720,000
b. Merk Ichico :
- IC-100S Leather buah 7,515,000
- IC-100 Oscar /Fabric buah 4,300,000
- IC-100TC Oscar /Fabric buah 4,310,000
- IC-101 Leather buah 6,899,000
- IC-101 Oscar /Fabric buah 3,388,000
- IC-101TC Oscar /Fabric buah 4,025,000
- IC-102 Oscar /Fabric buah 3,800,000
- IC-102B TC Oscar /Fabric buah 4,025,000
- IC-103 Oscar /Fabric buah 2,900,000
- IC-103B TC Oscar /Fabric buah 3,425,000
- IC-104 Oscar /Fabric buah 2,650,000
- IC-104B TC Oscar /Fabric buah 4,025,000
- IC-105 Oscar /Fabric buah 4,090,000
- IC-106 Oscar /Fabric buah 3,500,000
- IC-106HDT Oscar /Fabric buah 3,035,000
- IC-107 Oscar /Fabric buah 3,327,000
- IC-107TC Oscar /Fabric buah 2,885,000
- IC-108 Oscar /Fabric buah 2,650,000
- IC-300 Oscar /Fabric buah 2,915,000
- IC-301 Oscar /Fabric buah 2,285,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
- AL 101 Hidroulic, Rocking, Armrest
- AL 101G Hidroulic, Rocking, Heavyduty
- WIN 1 Executif Direct
- EL 900 Hidroulic,Heavy
- EL 901 Hidroulic,Heavy
23
1 3 4 5
- IC-302 Oscar /Fabric buah 3,449,000
- IC-302TC Oscar /Fabric buah 4,025,000
- IC-303 Oscar /Fabric buah 2,850,000
- IC-303TC Oscar /Fabric buah 2,975,000
- IC-306 Oscar /Fabric buah 2,475,000
- IC-307 Oscar /Fabric buah 1,999,000
- IC-700 Oscar /Fabric buah 5,200,000
- IC-111 Oscar /Fabric buah 1,232,000
- IC-206 Oscar /Fabric buah 1,125,000
c. Merk Donati :
- DO - 25 UA Visitor chair buah 1,500,000
- DO - 32 UA Visitor chair PU Armest buah 1,355,000
- DO - 32 U Visitor chair buah 1,232,000
- DO - 35 U Visitor chair buah 1,200,000
- DO - 37 U Visitor chair buah 1,166,000
buah 1,500,000
e. Merk ATLANTA
- AL 102 buah 1,750,000 ATLANTA
- AL 103 buah 1,225,000 ATLANTA
- AL 104 buah 1,675,000 ATLANTA
- AL 105 buah 1,225,000 ATLANTA
- AL 201 buah 1,157,000 ATLANTA
- AL 202 buah 1,570,000 ATLANTA
- AL 203 buah 1,360,000 ATLANTA
- AL 204 buah 1,360,000 ATLANTA
- AL 205 buah 1,300,000 ATLANTA
- AL 206 buah 1,400,000 ATLANTA
f. Merk WINNER
- WIN 2 buah 1,305,000 WINNER
- WIN 3 buah 1,220,000 WINNER
- WIN 4 buah 1,150,000 WINNER
- WIN 5 buah 1,150,000 WINNER
3 Kursi Gambar :
- Ichiko IC-200 C Oscar /Fabric buah 1,000,000
- Ichiko IC-200 D Oscar /Fabric buah 1,500,000
- Ichiko IC-203 Oscar /Fabric buah 1,650,000
- Ichiko IC-01 D Oscar /Fabric buah 1,125,000
- Ichiko IC-03 D Oscar /Fabric buah 1,350,000
- Ichiko IC-204 Oscar /Fabric buah 1,200,000
- Chairman SC-309 Oscar /Fabric buah 800,000
- Donati DO-61 Oscar /Fabric buah 825,000
- Donati DO-59WA Nylon, gaslift buah 900,000
4 Kursi Rapat :
a. Kursi Lipat
- Furtura FTR 747 buah 616,000 Bahan Vinyl Plat baja Gb.33
- Furtura FTR 501 buah 440,000 Bahan Vinyl Plat baja
- Furtura FTR 407 A buah 375,000 Bahan Vinyl Plat baja
- Furtura FTR 407 buah 467,000
- Furtura FTR AG buah 434,000
- Furtura FTR 509 buah 515,000
- Furtura FTR 506 buah 425,000
- Vios MND buah 575,000
- Vios MBD buah 490,000
- Vios HAA buah 414,000
- Vios HNN buah 396,000
- Chitose, Yamato MND buah 590,000
- Chitose, Yamato MBD buah 535,000
- Chitose, HAA buah 475,000
- Chitose, HNN buah 396,000
b. Kursi Susun
- Furtura FTR 406 buah 951,000
- Furtura FTR 416 buah 951,000
- Furtura FTR 410 buah 847,000
- Furtura FTR 405 buah 558,000
- Furtura FTR 418 buah 688,000
(sandaran rendah)
d. Merk Lexus, Lex 830 Lexus
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
24
1 3 4 5
- Furtura FTR 408 RE buah 689,000
- Furtura FTR 408 oscar buah 562,000
- Furtura FTR 409 buah 558,000
- Furtura FTR 419 buah 699,000
- Vios 805 buah 378,000
- Vios 807 buah 397,000
- Vios Avanza 806 buah 397,000
- Vios X-tra buah 450,000
5 Kursi Komputer :
- Chitose Swivel Chair 850-NA buah 850,000
- Chitose Swivel Chair 850-NC buah 964,000
- WIN 8 buah 425,000 WINNER
- WIN 9 buah 506,000 WINNER
- Ichiko IC-200C buah 950,000
- Ichiko IC-7HB buah 660,000
- Ichiko IC-6H buah 560,000
- Donati DO-64G buah 640,000
- Donati DO-63G buah 720,000
6 Kursi hadap/kursi tunggu :
- AL 301 buah 700,000 ATLANTA
- AL 302 buah 700,000 ATLANTA
- AL 303 buah 900,000 ATLANTA
- AL 304 buah 900,000 ATLANTA
-Ouma Flat 04 buah 2,500,000 4 dudukan tanpa sandaran
-Ouma DMS-03 buah 2,200,000 3 dudukan tanpa sandaran
-Ouma DMS 04 buah 2,800,000 4 dudukan tanpa sandaran
-Ouma DMS 03S buah 3,200,000 3 dudukan tanpa sandaran
7 Meja rapat :
- LUFO LOD 125 Uk. 120 x 60 x 75 cm buah 1,140,000 GLORY
- LUFO LOD 126 Uk. 120 x 60 x 75 cm buah 1,530,000 GLORY
- Meja rapat single (Jampi Marta) buah 1,416,000 GLORY
- Arjuna Desk A 16080 Uk 120x80x73 cm buah 2,262,000 GLORY
- GD 2010 uk 200x100x75 buah 1,697,000 GLORY
- GD 2412 uk 240x120x75 buah 1,745,000 GLORY
- GD 1212 diameter 120x75 buah 1,285,000 GLORY
- GD 1890 D uk 180x90x75 buah 1,630,000 GLORY
- NGD 500 uk 200x100x75 buah 1,330,000 GLORY 2
- NGD 520 diameter 90x75 buah 1,260,000 GLORY 2
- NGD 530 diameter 120x75 buah 1,295,000 GLORY 2
- NGD 540 oval uk 200x100x75 buah 1,395,000 GLORY 2
Set 12,880,000 kapasitas 15 org
- Grand Lexus conference LX1880+LX145D Set 22,160,000 kapasitas 26 org
- Ouma JM(DM)232-350 Set 21,400,000 kapasitas 18 org
8 Meja Kerja :
- Type 419 uk 46x70x74 Top Lenolium buah 2,055,000 ELITE
- Type 420 uk 120x70x74 Top Lenolium buah 3,165,000 ELITE
- Type 421 uk 160x70x74 Top Lenolium buah 4,285,000 ELITE
- Type 419 A uk 46x70x74 Top Tacon buah 2,170,000 ELITE
- Type 420 A uk 120x70x74 Top Tacon buah 3,345,000 ELITE
- Type 421 A uk 160x70x74 Top Tacon buah 4,285,000 ELITE
- Type 421 AL-100 uk 160x70x74 Top Tacon buah 4,825,000 ELITE
- Type 421 AL-80 uk 46x70x74 Top Tacon buah 4,500,000 ELITE
- GD 120 meja 1/2 biro uk 120x75x75 buah 1,350,000 GLORY
buah 1,680,000 GLORY
buah 1,600,000 GLORY
buah 1,600,000 GLORY
- EGD 100 meja direktur uk 160x80x75 buah 2,588,000 GLORY
- NGD 360 meja 1/2 biro uk 120x75x75 buah 1,500,000 GLORY 2
- NGD 370 meja 1 biro uk 150x75x75 buah 1,750,000 GLORY 2
- NGD 1000 meja direktur uk 200x100x75 buah 3,400,000 GLORY 2
9 Meja Komputer :
buah 1,190,000
buah 1,450,000
- GD 160C uk 90x60x70 buah 1,375,000 GLORY
- GD 170C uk 80x80x75 buah 1,155,000 GLORY
- GD 180C uk 120x75x75 buah 1,185,000 GLORY
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
- Aztec CD-1288 uk 120x60x78,5 cm
- Grand dynamic Conference DCMT
- GD 150 meja 1 biro+laci+kotak uk
- GD 1800 D mj direktur tanpa laci
- GD 1890 D mj direktur tanpa laci
- Aztec CD-1206 uk 120x60x75 cm
25
1 3 4 5
- NGC 480C uk 120x75x75 buah 1,265,000 GLORY 2
- NGC 4000 uk 120x75x90 buah 2,651,000 GLORY 2
10 Fortuna Taurus L.2.2 meja sudut PUF Set 4,330,000 oscar/kain
11 Set 5,050,000 oscar/kain
12 Acrylic Meter 500,000
E. MESIN KANTOR
Harga Termasuk Pajak
1 3 4 5
1 Mesin Ketik
a. Mesin Ketik Manual :
- Royal 775 Express 18'' buah 4,065,000
- Royal 775 26'' buah 5,393,000
- Royal DLX R 13 13'' buah 1,541,500
- Royal 205 9'' buah 1,344,000
- Royal 206 10'' buah 1,773,000
- Royal Express 13'' buah 2,142,500
- Royal R.208 DLX Express 9,5'' buah 3,852,000
- Brother M 750 TR 9,5'' buah 1,218,500
- Brother M 2000 PM 13'' buah 1,499,700
- OLYMPIA Carina 3 13'' buah 3,055,000
- OLYMPIA SG3N 18'' buah 4,544,000
- OLYMPIA SM 18" buah 2,444,600
- OLIVETTI Linea 98 18'' buah 3,860,700
- OLIVETTI Linea 98 Body Besar 27" buah 5,365,000
b. Mesin Ketik Elektronik:
- BROTHER GX-6750 13" buah 3,162,000
- BROTHER 8250 14,5'' buah 4,017,100
- BROTHER EM.630 15,5'' buah 11,922,700
2 KALKULATOR :
a. Merk Casio :
- HR 100 TR buah 557,100
- DM 1400 14 Digit buah 263,500
- DM 1600 16 Digit buah 362,100
- Pro M 12 Digit buah 201,400
- D 40 LW 14 Digit buah 229,100
- D 60 L 16 Digit buah 223,900
- 10 Digit SL 240 buah 184,300
- 10 Digit LC 1000 L buah 148,900
- 10 Digit JF 100 buah 251,700
- 12 Digit JS 20 LA buah 568,800
- 12 Digit LC 1210 buah 113,600
- 14 Digit DR - 140 N buah 1,573,600 pakai struk
- 14 Digit FR 3400 buah 1,365,800 pakai struk
- 14 Digit DR 8420 buah 3,315,000
- Type SL -1200 buah 267,800
- Type FR - 2650 A buah 950,100
- Type FR - 5202 buah 856,700
- Type LC - 1200 L buah 113,600
b. Merk Citizen :
- CX 808 buah 374,900
- CX 32 N buah 964,100
- SDC -862 buah 112,500
- SDC -8780 L 12 Digit buah 123,200
- SDC -868 L 12 Digit buah 128,500
- CT - 600 J buah 458,500
3 PERALATAN GAMBAR MUTOH :
- Drafting Machine SY -80 unit 11,757,000
- Drafting Machine MVF-110 unit 7,279,000
- Drafting Machine EM - 1200 (A1) unit 9,347,000
- Drafting Machine QSJ - 1000 (A2) unit 5,350,800
- Drafting Machine QSJ - 1200 (A1)GM unit 10,713,500
2
HARGA KETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
Fortuna Accord L.2.3 PUF meja mahoni
NO NAMA BARANG SATUAN
26
1 3 4 5
- Drafting Machine QSJ - 1500 (A0) unit 34,174,500
- Drafting Machine WAJ - 1200 unit 12,774,400
- Drafting Machine WAJ - 1500 unit 14,448,500
- Drafting Machine EYJ - 1200 unit 14,447,800
- Drafting Machine EYJ - 1500 unit 12,760,400
4 OVER HEAD PROJECTOR (OHP) :
- 3 M Model 2660 unit 5,922,500
- 3 M Model 9800 unit 6,416,100
- 3 M Model 3808 unit 3,760,000
- 3 M Model 1708 unit 2,700,500
- 3 M Model 1608 unit 2,217,400
- 3 M Model 9100 unit 6,083,500
- 3 M Model 1750 unit 5,061,600
5 Layar OHP :
- Uk. 70'' x 70'' Cm DA-LITE buah 1,720,900
- UK.70'' x 70'' 3M buah 1,231,900
- Uk. 70'' x 70'' Pro Vision buah 1,606,800
- Uk. 70'' x 70'' New Mark buah 1,057,300
- Uk. 70'' x 70'' Focus buah 1,446,000
6 AUTOMATIC WATERPAS :
- Wild NA-820 unit 3,854,500
- Wild NA-824 unit 4,387,000
- Wild NA-828 unit 5,783,800
Peralatan Survey ukur TOPCON
Auto level / Waterpas
- AT - B4 unit 5,891,800
- AT - G2 unit 29,470,700
- AT - G3 unit 20,125,700
- AT - G6 unit 14,385,300
- AT - G7 unit 11,803,500
- AT - F6 Pembesar 22x unit 5,061,500
- AT - F3 Pembesar 30x unit 5,452,000
- AT - F3 Pembesar 32x unit 5,047,300
7 THEODOLITE :
- Theodolite TL-20 GF/TL-20 G unit 33,743,600 Pembac.min.20 detik
- Theodolite TL-6 G unit 50,856,400 Pembac.min.6 detik
- Leica T-100 unit 23,236,800
- Leica T-460 unit 38,931,400
- Sokhisa TM-6 unit 30,295,500
- Sokhisa Elektronik Theodolite DT-4 unit 35,444,700
unit 44,710,300
unit 32,991,600
unit 59,601,100
unit 69,115,500
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
- Sokhisa EDM Red Mini 2S (Standart
Yoke Mount Type) terdiri : Red mini 2
dengan Yole BDC 18 Ni-Cd Battery EDC
11 Adaptor CDC Chager Mounting Boss
untuk Theodolite PR3Bt+ Tripot Triple
Prims.- Sokhisa EDM Red mini 2Y (independent
Type) terdiri dari Red mini 2 aiming head
dengan Yoke BDC 18 Ni-Cd Battery EDC
11 changer SB 19+WA+Tripot Optical
plummet Branchket dgn trubrach dan
tripot.
- Sokhisa EDM Red 2AS (medium range)
dengan kelengkapan SY 4 Yoke Mounting
Noss utk theodolite SF 2 Fountion Key
BDC 11 Battery Canger 220-330 V PR3
BT Triple Prims dengan tripot.
- Sokhisa EDM Red 2 LS (longrenge)
dengan kelengkapan SY 4 Yoke Mounting
Boss utk Theodolite SF 2 kapan SY 4 Yoke
Mounting Boss utk Theodolite SF 2
Fountion key BDC 11 Built-in Baterry
Changer 220-330 V PR3BT Tripple prims
dengan Tripot.
27
1 3 4 5
8 THEODOLITE ELEKTTRIC DIGIT :
- Detheodolite DT 101 unit 52,048,000 Pembac.Min.30 detik
- Detheodolit DT 103 unit 30,838,300 Pembac.Min.5 detik
- Detheodolit DT 104 unit 28,541,500 Pembac.Min.10 detik
- Detheodolite DT 106 unit 22,608,400 Pembac.Min.20 detik
unit 77,128,200
unit 60,738,500
- edm DM-A5 unit 42,901,300 Jarak Pembesar 1100 m
- edm DM-A5 unit 57,845,700 Jarak Pembesar 2800 m
- edm DM-A5 unit 6,529,900 Jarak Pembesar 3600 m
9
- Nideka EX 8820 unit 6,049,300
- Nideka EX 9821 unit 575,000
- Nideka EX 2000 unit 9,832,400
- Amano EX 3500 unit 5,554,200
- Amano EX 9300 unit 9,832,400
- Amano EX 6500 unit 7,158,500
- Autec TR200 unit 3,475,600
10 PAPER SHADDER/MESIN PENGHANCUR DOKUMEN :
unit 1,026,200
unit 1,123,600
unit 1,756,600
unit 2,303,200
unit 2,139,300
unit 2,564,600
unit 692,300
unit 2,699,500
unit 3,845,700
unit 12,586,900
unit 13,067,900
unit 4,101,700
unit 8,697,300
unit 11,762,000
unit 11,590,700
unit 22,164,700
unit 22,783,900
unit 32,907,000
unit 37,845,300
unit 40,974,400
unit 45,847,400
unit 93,925,000
unit 95,000,000
unit 210,000,000
unit 220,000,000
unit 200,000,000
unit 874,500,000
- Eba Type Personal 1022 S unit 9,069,500
- Eba Type Personal 1226 S unit 9,069,500
- Eba Type Personal 126 S unit 12,966,300
- Ideal 1000 unit 3,470,800
- Ideal 2401 M unit 8,917,500
- Ideal 3800 unit 14,774,900
- Prima 800 S unit 1,904,100
- Gallant 220 ST unit 1,277,400
- Gallant 250 S unit 1,031,100
- Taifun 1101 unit 2,891,800
- Taifun 1407 unit 13,473,300
- Taifun 1444 unit 22,579,300
- Taros 2001 unit 2,887,500
- Taros 5030 unit 15,666,700
- Taros 3088 unit 6,743,900
- Panasonic MS-20 unit 3,760,000
- Panasonic MS-50 unit 4,217,900
- Intimus HIT 100 unit 1,325,600
- Intimus Sumplex Se unit 4,224,400
- Intimus 300 CC unit 6,349,600
2
- Ideal 3104
- Ideal 3104 CC
- Ideal 3804
- Ideal 3804 CC
- Ideal 4002
- Ideal 4002 CC
- Secure Maxi 3180 Strip Cut
- Secure Maxi 3180 Cross Cut
- Ideal 2245 CC
- Ideal 2360
- Ideal 2465 SC
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
- Ideal 4005
- Ideal 4005 CC
- Ideal 4605 CC
- Ideal 4107
- Ideal 4107 CC
- Ideal 5009-2 CC
- Ideal 2465 CC
- Secure Maxi 25 CCM
- Secure Maxi 24 StripCut
- Secure Maxi 15A Cross Cut
- Secure Maxi 18 Cross Cut
- Secure Maxi 34 SCM
- Secure Maxi 34 CCM
- Detheodolite DT 209
- Detheodolite DT 205L
TIME RECORDER / MESIN ABSENSI
- Secure EzSS-6315A
- Secure EzSC-10A
- Secure Maxi 25 SCM
28
1 3 4 5
- Intimus 390 SE unit 10,578,100
- Intimus 431 SE unit 26,974,100
11 Unit 3,855,900
12 Mesin Fotocopy :
a. Canon :
- ImageRunner (iR) 1435 unit 15,500,000
- ImageRunner (iR) 2004N+DADF unit 24,000,000
- ImageRunner (iR) 2520 unit 26,245,000
- ImageRunner (iR) 2525 unit 35,800,000
- ImageRunner (iR) C3320 unit 74,500,000
b. Fuji Xerox
- DocuCenter (DC) S2320 unit 21,970,000
- DocuCenter (DC) S2520 unit 23,000,000
- DocuCenter (DC) SC2020 unit 53,000,000
13 Kawat Spiral (GERMANY) Renz Combi SW1 Buah 3,950,000
14 Komputer :
a. Tidak bermerek/ Un Branded
Intel Dual Core G3220 MB Unit 5,170,000 Dual Core Sandybridge
Gigabyte H81
DDR3 2GB Lifetime
Hardisk 500 GB WDC 7200 Rpm
VGA, Souncard on board
DVDRW LG
Speaker MINI
Mini Keyboard & Mouse Genius
Case ATX 450 WATT
Monitor LCD 15,6" LG & Mouse Pad
Intel Core i3 4130 Unit 5,900,000
MB H81 Gigabyte
DDR 3 2GB Lifetime Warranty
Hardisk 320GB WDC
VGA Radeon R7 240
DVDRW LG
Speaker MINI
Keyboard & Mouse Genius
Case Dazumba 650 380 Watt
Monitor LED 19" Viewsonic
Mouse Pad
Intel Core i3 4130 MB Unit 6,270,000
ECS H81
DDR3 2Gb Lifetime Warranty
Hardisk 500GB WDC
VGA Radeon 5570 1GB
DVDRW Samsung Internal
Speaker Genius Mini
Keyboard & Mouse Genius
Case Dazumba 650 380 Watt
Monitor LED 20" LG dan Mouse Pad
Intel Dual Core G 3260 Unit 6,270,000
H81 MHV3 Bio Star
DDR3 2Gb Visipro
Hardisk 500GB Seagate
VGA Soundcard on board
DVDRW LG
Case Ersys + PSU 500 watt
Keyboard & Mouse Genius USB
Monitor LED 16" LG dan Mouse Pad
Intel Core i3 4170 Unit 6,380,000
H81-MHV3 Bio Star
DDR3 2Gb Visipro Lifetime
Hardisk 500 GB Seagate
VGA Radeon 5570 1 Gb
DVDRW LG
Speaker Mini
Keyboard & Mouse Genius
Case Molucca 650 380 watt
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
Binding Machine (Mesin Jilid) Plastik
29
1 3 4 5
Monitor LED 20" LG dan Mouse Pad
AMD APU A4-4020 Unit 6,260,000
Gigabyte A58
DDR3 2GB Lifetime Warranty
Hardisk 500GB WDC
VGA Radeon R7 240
DVDRW Samsung Internal
Speaker Genius Mini
Keyboard & Mouse Genius
Case Dazumba 650 380 Watt
Monitor LED 20" LG dan Mouse Pad
AMD APU A4-4020 Unit 6,300,000
Asrock A58-VG3
DDR3 2GB Visipro Lifetime
Hardisk 500GB WDC
VGA Radeon R7 240
DVDRW LG
Speaker Mini
Keyboard & Mouse Genius
Case Dazumba 650 380 Watt
Monitor LED 20" LG dan Mouse Pad
b. PC/ Komputer branded dengan monitor
- LENOVO C2030 F0B2004EID Unit 7,765,400 19,5" HD LED
- HP SLIMLINE 400-326x Unit 9,318,600 20" HD LED
- LENOVO THINKCENTRE E 93 10AR00271F Unit 12,537,600 18,5" HD LED
- DELL OPTIPLEX 3030 CTO Unit 9,070,000 19,5" HD LED Touch
- HP ENVY 27-K005D Unit 20,895,000 27" HD LED Touch
- LENOVO AIO 510-22ISH-F1ID (Black) Unit 9,105,400
- PC BRANDED ALL IN ONE HP 24-G027I Unit 13,176,000
- LENOVO B50-30-JPID Unit 15,000,000
- DELL INSPIRON 3264 Unit 14,100,000
unit 44,735,000 Dell Power edge R430 D-R430
SNS 0516
15 Lap Top/Notebook
Unit 7,130,000
- Toshiba L15W-B1208X Win 10 Touch 360° Unit 6,875,000
- Toshiba C55T-C5224 Win 10 Touch Unit 6,875,000
- Toshiba E45W-C4200 Win 10 Touch 360° Unit 8,250,000
- Toshiba P55W-C5204 Win 10 Touch 360° Unit 12,375,000
- DELL Inspiron 14-3443 Intel 3205U Unit 4,778,200
- DELL Inspiron 14-3442 Intel 3558U Unit 5,830,000
- DELL Inspiron 14-3458 Core i3-4005U Unit 8,360,000
- DELL Inspiron 14-5459 Core i7-6500U Unit 16,375,000
- Asus X200 MA-KX436D Unit 4,180,000
- Asus X200 MA-KX150D Unit 3,850,000
- Asus X441 NA-BX002 Unit 5,060,000
- Asus X453MA-WX238D Unit 4,325,000
- Asus X453MA WIN 8.1 Unit 4,500,000
- Asus X455 LA Unit 6,820,000
- Asus X455 LD-WX052D Unit 7,375,000
- Asus X455 LD-WX053D Unit 7,500,000
- Acer Aspire Es1-421-40A8/44JZ Unit 5,060,000
- Acer One 14-Z1402-POJN WINDOWS 10 Unit 6,200,000
- Acer One 14-Z1402-POJN Unit 5,500,000
- Acer Aspire E5-473-36HP Unit 7,150,000
- Acer Aspire V3-371-57TL(i5) Unit 8,500,000
- Acer Aspire E5-552G-F6X5/F1S1 Unit 10,450,000
- Acer Aspire Switch 11SW5-173-67VS Win 10 Unit 12,500,000
- Acer Aspire Switch 11SW5-173-67VS Unit 13,750,000
- Acer Aspire V5-591G-7660 Unit 17,600,000
- HP 11-F004/5TU Unit 3,750,000
- HP 14-G102AU Unit 4,000,000
- HP 14-af118AU Unit 5,180,000
- HP 14-ac001/2/3TU Unit 4,351,300
- HP 14-ac150/1/2TU Win 10 Unit 3,856,400
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
c. PC/ Komputer Server branded dengan
- Komputer Server
- Toshiba E45DW-C4210 Graphic Win 10
2
30
1 3 4 5
- HP 14-ac153TU Win 10 Unit 4,875,000
- HP 14-ac156/57TU Unit 4,700,000
- HP 14-ac004TX Unit 5,900,000
- HP 14-ab023TXWin 8.1 Unit 14,500,000
- HP 14-ab133/4/5TX Win 10 Unit 12,250,000
16 LCD :
- Sony VPL DX122 Unit 5,996,700
- Sony VPL DX220 Unit 6,427,400
- Sony VPL DX221 Unit 5,891,800
- Sony VPL DX240 Unit 7,766,400
- Sony VPL DX241 Unit 7,843,500
- Sony VPL EW235 Unit 13,014,300
- Sony VPL EW455 Unit 18,199,000
- Sony VPL EX255 Unit 12,513,000
- EPSON EB X400 Unit 6,713,400
- EPSON EB S400 Unit 5,632,500
- EPSON EB X450 Unit 6,561,300
- BENQ MX532 Unit 9,142,400
- BENQ MS506 Unit 5,731,000
- ACER X1123H Unit 4,713,400
- Screen Proyektor Unit 803,400 Mootrized BRITE 70 MR 1818
- Screen Proyektor Unit 427,400 Triport 70
- Screen Proyektor Unit 1,585,400 Manual 100"
- EPSON EB X200 Unit 5,623,900
- EPSON EB X11 Unit 5,918,500
- BENQ MX505 Unit 8,259,100
- BENQ MS504 Unit 6,223,800
17 Printer :
- HP DJ 2135 Unit 668,400
- HP D2676 Unit 1,267,200
- HP D3635 Unit 1,143,000
- HP Laserjet Pro MFP M125a Unit 1,928,200
- HP Laserjet Pro MFP M130a Unit 2,771,300
- HP Laserjet Pro M12w Unit 1,820,000
- HP Laserjet CP 1025 Unit 2,999,400
- HP GT 5820 Unit 2,570,900
- Canon MX497 Unit 1,553,300
- Canon G1000 Unit 2,360,900
- Canon G1010 Unit 1,483,600
- Canon G2010 Unit 1,926,000
- Canon G2000 Unit 2,795,900
- Canon E400 Unit 1,081,900
- Canon E410 Unit 969,500
- Canon Pixma 2770 Unit 682,400
- Canon MG 2570 Unit 1,079,800
- Canon LBP 6030 Unit 1,981,200
- Epson L 110 Unit 1,901,400
- Epson L 120 Unit 1,991,400
- Epson L 210 Unit 2,457,400
- Epson L360 Unit 2,249,600
- Epson L220 Unit 2,849,600
- Epson L565 Unit 4,971,600
- Epson LX310 Unit 3,030,500
18 Printer Dot Matrix :
Unit 3,990,300
Unit 7,497,500
Unit 7,911,000
Unit 2,597,700
- LX 310 Unit 1,820,000
- LX 300 + II Unit 2,089,000
19 Printer KTP Elektronik Unit 56,100,000 Fargo HDP 5000
20 Printer KIA/ Matica Unit 17,325,000 Matica Espresso
21 Stabilizer :
- Servo Kenika 600 VA buah 579,500
- Servo Matsugawa buah 266,700
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
- PLQ 20
- LQ 310
- LQ 2180
- LQ 2190
31
1 3 4 5
- Kasugawa 500 VA buah 303,000 Tanpa AVR
22 UPS :
- Kenika FSP 600VA buah 517,000
- Kenika FSP 800VA buah 700,000
- Kenika FSP 1200VA buah 1,216,000
- Prolink 1200 VA buah 1,066,000
- UPS 1500 VA buah 6,374,000 APC, Sarana Prasarana IT
- UPS 5000 VA buah 3,295,000 APC, Sarana Prasarana IT
23 Scanner :
- Canon Scanner Li DE 120 buah 906,000
- Plustek Optic Book 3800 buah 7,244,000
- Plustek Mobile Office AD460 buah 5,924,000
- Plustek A3 buah 21,993,000 600 x 1200 dpi, colour, 2.48 sec
24 CD Writer/ Optical drives :
- DVDRW LG Tray buah 215,000
- DVDRW External LG buah 337,000
- DVDRW External Asus buah 342,700
- Samsung DVD RW buah 364,200
- Lite On DVD RW buah 368,500
- Assus DVD RW buah 353,500
25 Monitor :
- LG 16" LCD buah 905,200 LED
- LG 16 M37A-B LED buah 1,135,400
- LG 24MP57HQ-P LED IPS buah 2,661,900
- LG 17MB15T-B TOUCH SCREEN LED buah 2,613,700
- LG 25UM57-P ULTRAWIDE LED IPS buah 2,343,800
- LG 29UM65-P ULTRAWIDE IPS LED buah 4,188,500
- DELL E2215HV LED buah 1,553,200
- BenQ BL702A LED buah 1,419,400
- BenQ GL2460 LED buah 2,142,500
- BenQ VW2245Z LED VA buah 1,365,800
- ASUS VS278Q LED buah 4,114,500
- FORSA LS-1501 LCD buah 658,800
- ViewSONIC VA2249S LED IPS buah 1,713,900
unit 1,526,500
- PHILIP'S 17" CRT Digital, Flat-Ness unit 1,098,000
- PHILIP'S 23.6" LED, 243V5LHSB/70 unit 2,585,900 HDMI
unit 1,874,600 HDMI, IPS + TV
- PHILIP'S 17" CRT Digital, Flat-Ness unit 1,098,000
- Samsung 23,5" LED+TV,LT24D310AR unit 1,949,600 HDMI
- Samsung 21,5" LED, S22D300HY unit 2,248,500 HDMI
- ViewSonic 15,6" LED, VA 1620A/1603A unit 857,000
- ViewSonic 21,5" LED, VA 2246 unit 2,266,700
- LCD Samsung 18,5" buah 1,327,200 LED+HDMI
- LCD Samsung 19" buah 984,500
26 Motherboard :
- MSI 760 6M-P34 buah 865,500 ECS A58
- Asus MSA 78 LMA buah 1,671,000 G1 SNIPER B5
- MSI H110M buah 830,200
- MSI B250M Pro VH buah 1,253,300
- MSI B360M Mortar buah 1,810,400
- MSI Z370 Tomahawk HDMI buah 2,998,400
- MSI B250i Pro buah 1,339,400
- MSI B250M Mortar buah 1,606,800
- MSI Z270 Tomahawk HDMI buah 2,785,200
- MSI Z370 PC Pro buah 2,565,500
- Gigabyte GA-H110M buah 1,187,900
- Gigabyte GA-B250M-D2V buah 1,912,000
- Gigabyte GA-A320M-S2H buah 1,133,800
- Gigabyte GA-AB350M buah 2,287,000
27 Hardisk Internal :
- WDC 160GB 7200 RPM buah 166,000
- WDC 1 TB 7200 RPM buah 807,700
- WDC 500GB 7200 RPM buah 786,300
- Seagate 500GB 7200 RPM buah 615,900
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
- PHILIP'S 24" LED 24PHA4110S/98
- PHILIP'S 21.5" LED, 222TE6QB
2
32
1 3 4 5
- Seagate 160GB 7200 RPM unit 150,000
- 1000 GB WDC-64 MB, 7200 RPM unit 720,900
- 500 GB WDC-16 MB, 7200 RPM unit 822,700
- 500 GB SEAGATE-16 MB, 7200 RPM unit 749,800
- 500 GB Toshiba SATA unit 690,900
- 1 TB Toshiba SATA unit 707,000
- 1 TB WD Blue SATA unit 795,700
- 1 TB Seagate SATA Barracuda unit 808,700
- 2 TB Seagate SATA Barracuda unit 946,900
- 3 TB Seagate SATA Barracuda unit 1,547,900
- 4 TB Seagate SATA Barracuda unit 1,981,700
28 Processor :
- G1620 buah 642,700
- G1820 buah 972,600
- G 3220 buah 836,600
- G 3260 buah 964,100
- Core i3 - 4170 buah 2,099,600
- Core i3 - 7100 buah 2,024,600
- Core i5 - 7400 buah 3,572,500
- Core i7 - 7700 buah 5,717,200
- Core i3 - 8100 buah 2,158,500
- AM4 Ryzen 3-2200 Quad Core buah 1,322,900
- AM4 Ryzen 3-1200 Quad Core buah 1,301,500
- AM4 Ryzen 3-1300X Quad Core buah 2,159,500
- AM4 Ryzen 5-1500X Quad Core buah 2,709,000
29 Memory - RAM :
- Sodimm DDR 3 2 GB buah 215,000 Venom RX
- Sodimm DDR 3 2 GB buah 322,000 Samsung
- Sodimm DDR 3 4 GB buah 428,000 Venom RX LV 1,35V
- Sodimm DDR 3 4 GB buah 428,000 Samsung
- Sodimm DDR 3 4 GB buah 428,000 Kingston LV 1,35V
- Sodimm DDR 3 8 GB buah 750,000 V-Gen LV 1,35V
- Sodimm DDR 4 4 GB buah 520,000 Buldozer
- Sodimm DDR 4 4 GB buah 520,000 Visipro
- Sodimm DDR 4 8 GB buah 668,000 Visipro
- Kingstone 2GB DDR3 buah 356,700
- Kingstone 4GB DDR3 buah 255,000
- Kingstone 8GB DDR3 buah 875,000
- Apacer DDR III 2GB buah 263,000
- Visipro DDR III 2GB buah 316,000
- Lifetime DDR III 4GB buah 429,000
- DDR 4 4GB - 2400 buah 802,000 Buldoser
- DDR 4 4GB - 2400 buah 802,000 Visipro
- DDR 4 8GB - 2400 buah 1,015,000 Buldoser
- DDR 4 8GB - 2400 buah 1,726,000 Visipro
30 Keyboard :
- Logitech Keyboard+mouse buah 189,000 PS 2 optical black
buah 165,000 PS2 optical black MK100
- Black Easy keyboard buah 53,500
- Keyboard USB MTech buah 53,500
- Keyboard Genius USB KB 110 buah 128,500
- Keyboard Genius Luxemate i200 buah 161,000
- Keyboard mini bluetooth buah 196,000
31 Networking :
- Land Card PCI D-Link DFE-520T buah 80,000
- Land Card PCI Express D-Link DGE-560T buah 161,000 Gigabit
- Land Card PCI Express D-Link DGE-528T buah 187,000
buah 96,500 DWA-121
buah 262,500 DWA-548
buah 150,000 DWA-131
- Wireless USB Adapter D-Link buah 115,000 DWA-123
buah 149,000 + Antena
TL-WN722
buah 151,000 DWA-127 + Antena
- Wireless USB Adapter D-Link buah 133,000 DWA-132
- Wireless USB Adapter D-Link buah 375,000 DWA-172
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
- Wireless PCI Express Adapter D-Link
- Wireless USB NANO Adapter D-Link
- Wireless USB Adapter D-Link
- Wireless USB Adapter D-Link
- Logitech Keyboard+mouse
- Wireless USB NANO Adapter D-Link
33
1 3 4 5
- Switch 5 Port D Link DGS 1005A buah 381,500
- Switch 5 Port D-Link DGS-1005C buah 268,000
- Switch 8 Port D-Link DES-1008A buah 117,000
- Switch 8 Port D-Link DGS-108 buah 483,000
- Switch 16 Port D-Link DES-1016A buah 327,000
- Switch 16 Port D-Link DES-1016C buah 555,000
- Switch 24 Port D-Link DES-1024C buah 668,000
- Wireless Router D Link DIR 605 buah 278,000
- Wireless Router D Link DIR 612 buah 212,000
- Wireless Range Extender D-Link buah 376,000 DAP-1325
buah 387,000 DAP-1360 7in1
buah 589,000 DIR-809 AC750
- Tang UTP buah 43,000
- Kabel tester buah 51,000
- Converter USB to LAN buah 58,000
- Konektor RJ-45 D-Link Cat 5 Pak 58,000
- Konektor RJ-45 D-Link Cat 6 Pak 161,000
- Kabel UTP D-Link categori 5E Rol 1,178,000
- Kabel UTP D-Link categori 6E Rol 1,639,000
- Kabel UTP Belden categori 5E Rol 1,660,000
- ADSL Modem Router D Link 2750E buah 375,000
- Modem Wifi ZTE MF63 buah 397,000
- Router unit 595,000 Mikrotik
- Acces Point unit 1,607,000 Ubiquiti
- Switch unit 7,392,000 Cisco
32 Mouse :
- Mouse HP wireless buah 92,000
- Mouse Logitech B175 wireless buah 152,000
- Mouse Logitech M187 mini wireless buah 210,000
- Mouse Genius USB 120 buah 84,000
- Mouse USB Votre buah 27,000
33 Software dan Antivirus :
- WIN 7 buah 1,467,000
- WIN 8.1 buah 1,612,000
- WIN 8.1 buah 1,934,000
- WIN 10 buah 1,585,000
- Windows 10 Profesional 64 bit buah 2,261,000
- Office 2013 buah 2,250,000
- Office 2016 Home & Student buah 2,625,000
- Office 2016 Home & Business buah 3,910,000
- Mc Afee Internet Security 1 PC buah 129,000
- Kaspersky Antivirus 1 PC buah 183,000
- Kaspersky Antivirus 3 PC buah 418,000
- Kaspersky Internet Security 1 buah 377,000 PC 2018
- Kaspersky Internet Security 3 buah 495,000 PC 2018
34 Casing Komputer :
- Casing Alcatroz Azzura Z buah 332,000
- Casing Game Max 5903 buah 386,000
- Casing Simbadda Sim V2918 buah 386,000
- Casing Simbadda Sim V3129 buah 354,000
- Casing Dazumba Series DE503/505 buah 458,000
- Casing Alcatroz Futura Pro-6000/7000 buah 397,000
- Casing Armagedon M1Z White buah 466,000
- Casing Armagedon M1G buah 455,000
- Casing Venom RX Arkana buah 531,000
- Casing Infinity Hades buah 525,000
- Casing Infinity Magma buah 599,000
- Casing Infinity Zeus buah 697,000
- Casing Infinity Aegis buah 690,000
35 Power Supply :
- Power Supply 450 Watt Advance buah 118,000
- Power Supply 500 Watt Okaya buah 145,000
- Power Supply 500 Watt Xtreme buah 345,000
- Power Supply 600 Watt Xtreme buah 345,000
- Power Supply 380 Watt Dazumba buah 268,000
- Power Supply 450 Watt Dazumba buah 405,000
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
- Wireless Access Point D-Link
- Wireless Gigabit Router D-Link
2
34
1 3 4 5
buah 782,000
buah 825,000
buah 965,000
- Power Supply 450 Watt Gipro buah 114,000
- Power Supply 450 Watt Molucca buah 236,000
buah 563,000
36 Mesin Faximile :
- Brother 236S buah 2,269,000
- Brother 2840 buah 3,783,000
- Panasonic KX FT 983 CX buah 2,456,000
- Panasonic KX FT 981 CX buah 3,015,000
- Panasonic KX FT 987 CX buah 3,358,000
- Panasonic KX-FL422CX buah 4,445,000
37 Mesin Antrian yang terdiri dari : Set 30,000,000
- Display LCD TV 32 inc
- Caller (aplikasi pemanggil) software desktop
38 Kamera Digital unit 6,962,000 Cannon EOS.1200 D
39 Smartcard R/W Portable unit 15,769,000 Abaka
40 Smartcard R/W writer unit 3,910,000 Duali
41 Fingerprint Scanner unit 18,316,000 Biomorf
42 Iris Scanner unit 14,355,000 Cmitech
43 Signature Pad unit 12,384,000 Topaz
F. PERABOT KANTOR
Harga Termasuk Pajak
1 3 4 5
1. a. Filling Cabinet :
- Ichiban buah 4,750,000 4 laci
- Ichiban buah 3,535,000 3 laci
- Ichiban buah 2,955,000 2 laci
- Brother B-104 buah 2,517,000 4 laci
- Brother B-103 buah 2,035,000 3 laci
- Brother B-102 buah 1,874,000 2 laci
- Horse DL 104 buah 3,213,000 4 laci
- Horse DL 103 buah 3,053,000 3 laci
- Horse DL 102 buah 2,517,000 2 laci
- Acroe buah 5,100,000 4 laci
- Acroe buah 4,124,000 3 laci
- Acroe buah 3,186,000 2 laci
- Datascrip (TOP) Model Dinamika buah 4,606,000 4 laci
dan Konvensional 0,8 mm buah 3,733,000 3 laci
buah 3,588,000 2 laci
- Datascrip Dinamika buah 4,820,000 4 laci
- TOP FCT4 buah 2,946,000 4 laci
- TOP NC FCTN4-C buah 2,565,000 4 laci
- Filling cabinet datafile, StdLx buah 5,356,000 4 laci
b. Filling Cabinet Tahan Api :
- Ichiban Fire Proof TB4 - 4D buah 39,500,000 berat 350 kg
- Ichiban Fire Proof TB4 - 3D buah 34,500,000 berat 265 kg
- Ichiban Fire Proof TB4 - 2D buah 37,500,000 berat 180 kg
c. Rotary Cabinet :
- Model Ref.91-4 buah 27,500,000
- Model Ref.91-5 buah 35,000,000
- Model Ref.91-6 buah 37,500,000
2. ALMARI :
a. Almari Gambar (Grapphiteque) :
- Brother A1 (B-601) buah 6,963,000
- Brother A0 (B-602) buah 11,676,000
b. Almari Besi / Steel Cupboard :
- Brother B - 203 buah 2,624,000 2 Pintu
- Brother B - 204 buah 2,945,000 2 Pintu
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
- Power Supply 500 Watt Andyson M5 80
- Power Supply 700 Watt Dazumba 80
- Power Supply 550 Watt Dazumba 80
- Power Supply 450 Watt Thermaltake Lite
- Ticketing button include Printer Thermal
NO NAMA BARANG
35
1 3 4 5
- Brother B - 205 buah 3,299,000 2 Pintu
- Brother B - 206 buah 1,821,000 2 Pintu
- Brother Katalog/Kontak Kendali buah 3,631,000 12 Laci
- Brother B - 303 buah 3,364,000 Sliding
- Brother B - 304 buah 3,364,000 2 Pintu + kaca
- Brother B - 305 buah 2,463,000 Sliding
- Brother B - 306 buah 3,106,000 Sliding
- Brother B - 307 buah 4,231,000
- Datascrip ETC 21 buah 5,891,000 2 pintu biasa
- Datascrip ETC 22 buah 6,159,000 2 pintu kaca swing
- Datascrip ETC 23 buah 6,641,000 2 pintu kaca sliding
- Datascrip LF 05 buah 9,500,000 2 pintu ratracting
- Datascrip LF 056 buah 11,250,000 2 pintu ratracting kaca
- TOP CBST buah 3,738,000 2 pintu biasa
- TOP NS CBLTN buah 2,582,000 2 pintu kaca sliding
- Almari pintu ayun datafile, StdLx buah 5,891,000
- Almari pintu kaca geser datafile, StdLx buah 6,320,000
c. Locker :
- Top Locker buah 2,950,000 2 pintu
- Top Locker buah 3,160,000 3 pintu
- Top Locker buah 3,642,000 4 pintu
- TOP NS Locker buah 1,928,000 4 pintu
d. Compact Rolling Shelving/ Mobile File :
- Compacto Datascrip S4-100W-manual buah 45,000,000 4 Almari, 20 kompartemen
- Compacto Datascrip S6-100W-manual buah 65,000,000 6 Almari, 30 kompartemen
- Compacto Datascrip TW4-200W-manual buah 67,000,000 8 Almari, 40 kompartemen
- Compacto Datascrip TW6-200W-manual buah 96,000,000 12 Almari, 60 kompartemen
- Compacto Datascrip S6-100W-mekanik buah 78,953,000 6 Almari, 30 kompartemen
- Compacto Datascrip TW4-100W-mekanik buah 80,736,000 8 Almari, 40 kompartemen
- Compacto Datascrip TW6-100W-mekanik buah 117,649,000 12 Almari, 60 kompartemen
3 Brankas :
- Ichiban HS. 2040 A buah 7,391,000 Berat 55 kg
- Ichiban HS. 2040 TA buah 7,391,000 Berat 55 kg
- Ichiban HS. 2060 A buah 10,498,000 Berat 95 kg
- Ichiban HS. 2080 A buah 19,282,000 Berat 155 kg
- Ichiban HS. 2802 A buah 21,424,000 Berat 190 kg
- Ichiban HS. 2804 A buah 57,000,000 Berat 280 kg
- Ichiban HS. 2806 A buah 47,500,000 Berat 400 kg
- Ichiban HS. 2807 A buah 55,000,000 Berat 550 kg
- Ichiban HS. 2808 A buah 63,500,000 Berat 640 kg
- Lion (120 kg) buah 11,247,000 1 pintu, 1 laci, 1 shelf
- Lion (220 kg) buah 16,604,000 1 pintu, 1 laci, 1 shelf
- Lion (320 kg) buah 18,746,000 1 pintu, 1 laci, 2 shelf
4 Cash Box :
- Ichiban D-3000 buah 1,339,000 dengan alarm
- Ichiban D-2000 buah 1,044,000 dengan alarm
- Ichiban IB-30 buah 1,027,000
- Ichiban IB-20 buah 1,071,000
- Ichiban IB-10 buah 857,000
- Ichiban SCB 333 buah 1,499,000
5 Magnetik White Board :
a. Double Face dengan kaki :
- Daido : 60 x 90 buah 1,553,000
- Daido : 90 x 120 buah 2,464,000
- Daido : 90 x 160 buah 2,678,000
- Daido : 90 x 180 buah 2,742,000
- Daido: 120 x 240 buah 3,749,000
- Sakana : 60 x 90 buah 1,019,000
- Sakana : 90 x 120 buah 1,446,000
- Sakana : 90 x 160 buah
- Sakana : 90 x 180 buah 1,794,000
- Sakana: 120 x 240 buah 2,463,000
b. Single Face tanpa kaki :
- Daido 45 x 60 buah 482,000
- Daido 60 x 90 buah 720,000
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
36
1 3 4 5
- Daido 60 x 120 buah 910,000
- Daido 90 x 120 buah 1,242,000
- Daido 90 x 180 buah 1,606,000
- Sakana 45 x 60 buah 139,000
- Sakana 60 x 90 buah 241,000
- Sakana 60 x 120 buah 385,000
- Sakana 90 x 120 buah 589,000
- Sakana 90 x 180 buah 776,000
- Polos 45 x 60 buah 294,000 Pakai gantungan
- Polos 60 x 90 buah 385,000 Pakai gantungan
- Polos 90 x 120 buah 857,000 Pakai gantungan
- Polos 90 x 180 buah 1,178,000 Pakai gantungan
6 Elektrik White Board :
- Type Panaboard KX UB 5320 buah 32,243,000
- Type Panaboard KX UB 5820 buah 38,028,000
- Type Panaboard KX UB 7320 buah 48,205,000
7 Pemotong Kertas :
- Ichiban SK-52 Folio buah 3,856,000
- Ichiban SK-51 Double Folio buah 4,606,300
- VITEC Folio buah 836,000
- VITEC Double kuarto buah 4,692,000
8 Gantungan Surat Kabar buah 1,285,000
9 Panel-panel :
- Data buah 1,767,000
- Foto buah 1,285,000
10 Megaphone TOA Type ZR 1015 buah 605,000
11 Microphone TOA ZM-320 buah 428,000
12 Horn TOA :
- ZH 5025 BM 25 W buah 750,000
- ZH 5025 B 25 W buah 728,000
13 Handy Talkie buah 2,400,000
Handy Talkie Dual Band buah 5,140,000
14 Amplifier TOA :
- ZA 2120 120 W buah 2,988,000
- ZA 2240 240 W buah 4,713,000
- ZP 2240 240 W buah 4,927,000
- ZA 230 W 30 W buah 5,034,000
15 Microphone Stand Up Floor buah 1,001,000
16 TOA Wireless Microphone Unit 11,676,000 ZW-G810CU
G. ALAT-ALAT OLAH RAGA
Harga termasuk pajak
1 3 4 5
1 Cakram 1 kg buah 26,000 Karet
2 Cakram 1,5 Kg buah 39,000 Karet
3 Cakram 2 Kg buah 52,000 Karet
5 Tolak Peluru 1 Kg buah 26,000 Besi/Logam
6 Tolak Peluru 3 Kg buah 80,000
7 Tolak Peluru 5 Kg buah 129,000
8 Box susun 5 tingkat set 9,350,000 Bahan dr. kayu jati
9 Matras babut dari sabut kelapa lembar 375,000 1,5 x 2 meter
10 Matras dari spon dibungkus kain terpal lembar 1,250,000 1X 2 X 0,12 m
11 Matras dari spon dibungkus kain terpal lembar 1,700,000 1X 2 X 0,20 m
12 Matras dari spon dibungkus kain terpal lembar 2,100,000 1X 2 X 0,25 m
13 Bola kaki buah 375,000 Adidas
14 Bola Volley buah 800,000 Mikasa/Japan
15 Bola Volley buah 643,000 Molten Gold
16 Bola Volley buah 508,000 Mikasa/ Taiwan
17 Net Volley buah 245,000 Supra Istimewa/ molten
18 Net Volley buah 350,000 GTO Asli
19 Net Volley buah 200,000 GTO Lokal
20 buah 2,750,000 Tiang dr jati mistar dr kayu
KETERANGAN
(MERK/BAHAN)
2
Tiang lompat tinggi dan mistar standart
NO NAMA BARANG SATUAN HARGA
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
37
1 3 4 5
21 buah 2,145,000 Tiang dari jati mistar dari
alumunium
22 Shutle Cock Slop 65,000 AEC 12 buah
23 Shutle Cock Slop 65,000 AEC Biru
24 Shutle Cock Slop 65,000 AEC Merah
25 Shutle Cock Slop 70,000 AEC Kuning
26 Shutle Cock Slop 104,000 Romeo biru
27 Bola Tenis Kaleng 88,000 Dunlop
28 Bola Tenis Meja Slop 39,500 Shield isi 6 buah
29 Net Tenis Meja dan Tiang set 350,000 Tiang dari besi
30 Net Badminton buah 400,000 Supra Istimewa/Yonex/Smash
31 buah 8,250,000 Bahan dr jati, tebal papan min
2 cm
32 buah 4,500,000 Bahan dr particle board tebal
min 2cm
33 Raket Badminton buah 1,580,000 Yonex Japan
34 Raket Badminton buah 400,000 Taiwan
35 Bola Basket buah 250,000 Mikasa Hyper Arm (Size 7)
36 Bola Basket buah 548,000 Spalding Tf 250 Indoor-Outdoor
37 Raket tenis buah 3,000,000 Dunlop + senar
38 Raket tenis buah 2,500,000 Yonex + senar
39 Raket tenis buah 1,500,000 Wilson KW II
40 Raket tenis buah 4,000,000 Wilson KW I
H. TROPHY/PIALA KEJUARAAN
Harga termasuk pajak
1 3 4 5
1 Piala Kaki 1 (Marmer) set 400,000 1 set terdiri dari 3 buah
2 Piala Kaki 2 (Marmer) set 650,000
3 Piala Kaki 3 (Marmer) set 1,200,000
4 Piala Kaki 4 (Marmer) set 1,650,000
5 Piala Biasa set 175,000
I. PERALATAN KESENIAN
1. GAMELANHarga termasuk pajak
1 3 4 5
a. GAMELAN BESI
1 Gender Penembung/Slenthem rancak 1,928,000
2 Gender Barung rancak 1,928,000
3 Saron Demung rancak 1,450,000
4 Saron Ricik rancak 1,072,500
5 Saron Peking rancak 750,000
6 Bonang Barung rancak 7,500,000
7 Bonang Penerus rancak 3,850,000
8 Kethuk buah 535,000
9 Kenong set 5,570,000 1 set slendro/pelog
10 Kempyang rancak 857,000
11 Kempul set 4,928,000 1 set slendro/pelog
12 Suwukan Laras 1, 2 SL, 1, 2, 7 PL set 3,535,000 5 buah
13 Suwukan Laras 6 SL PL buah 1,610,000
14 Gong Besar buah 3,750,000
15 Gambang rancak 1,124,786 2 rancak
16 Rebab buah 857,000
17 Kendhang Gedhe buah 2,892,000
18 Kendhang Batangan buah 2,410,000
KETERANGAN
(MERK/BAHAN)
2
2
NO NAMA BARANG SATUAN HARGA
Tiang lompat tinggi dan mistar standart
Nasional
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
Meja tenis/pingpong standart Nasional
Meja tenis/pingpong standart Nasional
38
1 3 4 5
19 Kendhang Ketipung buah 1,072,000
20 Siter buah 643,000
21 Suling set 321,400
22 Bedhug Buah 7,500,000
23 Keprak Buah 500,000
24 Kecer Set 750,000
b. GAMELAN KUNINGAN
1 Gender Penembung/Slenthem rancak 5,570,000
2 Gender Barung rancak 8,000,000 rancak jati super / Galih
Nangka
3 Gender Barung buah 3,480,000 Standar
4 Saron Demung rancak 5,350,000
5 Saron Ricik set 19,300,000 6 rancak
6 Saron Ricik rancak 3,500,000 1 rancak
7 Saron Peking set 7,200,000 2 rancak slendro/pelog
8 Saron Peking rancak 3,000,000 1 rancak
9 Bonang rancak 20,350,000
10 Bonang Penerus buah 3,960,000
11 Bonang Barung rancak 4,659,000
12 Kethuk buah 1,285,000
13 Kenong rancak 19,817,000
14 Kenong buah 2,300,000
15 Kempyang rancak 2,300,000
16 Kempul set 17,675,000 1 set : 10 buah
17 Kempul buah 2,300,000
18 Suwukan Laras 1, 2 SL, 1, 2, 7 PL set 11,783,000 1 set : 5 buah
19 Suwukan Laras 1, 2 SL, 1, 2, 7 PL buah 3,481,000
20 Suwukan Laras 6 SL PL buah 6,748,000
21 Gong Besar buah 9,640,000
22 Gambang rancak 6,748,000
23 Rebab buah 964,000
24 Kendhang Gedhe buah 3,320,000
25 Kendhang Batangan buah 2,250,000
26 Kendhang Ketipung buah 884,000
27 Siter buah 643,000
28 Suling set 1,285,000
29 Bedhug Buah 10,000,000
30 Keprak Buah 500,000
31 Kecer Set 700,000
c. GAMELAN PERUNGGU
1 Gender Penembung/Slenthem rancak 15,200,000
2 Gender Barung set 19,280,000
3 Gender Barung rancak 9,000,000
4 Gender Penerus set 17,675,000
5 Gender Penerus rancak 8,000,000
6 Saron Demung set 10,700,000 4 rancak
7 Saron Demung rancak 11,250,000
8 Saron Ricik set 56,250,000
9 Saron Ricik rancak 7,500,000
10 Saron Peking rancak 6,450,000
11 Bonang set 80,350,000
12 Bonang Penembung rancak 29,000,000
13 Bonang Barung rancak 16,000,000
14 Bonang Penerus rancak 15,000,000
15 Kethuk buah 5,100,000
16 Kenong set 59,000,000
17 Kenong buah 5,900,000
18 Kempyang rancak 6,700,000
19 Kempul set 53,500,000
20 Kempul buah 4,820,000
21 Suwukan Laras 1, 2 SL, 1, 2, 7 PL set 26,780,000
22 Suwukan Laras 6 SL PL buah 13,400,000
23 Gong Besar buah 32,136,000
24 Gambang rancak 6,430,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
39
1 3 4 5
25 Rebab buah 1,553,000
26 Kendhang Gedhe buah 5,790,000
27 Kendhang Batangan buah 4,820,000
28 Kendhang Ketipung buah 1,340,000
29 Kendhang Ketipung buah 1,820,000
30 buah 1,392,000
31 set 1,446,000
32 Keprak Buah 500,000
33 Kecer Set 1,450,000
34 buah 14,460,000
35 set 2,785,000
2. PAKAIAN KETHOPRAK
Harga termasuk pajak
1 3 4 5
a. GAYA MATARAMAN :
1 Kuluk Kanigara buah 375,000 Bludru dg list
2 Blangkon Jogja buah 234,000 Batik Tulis
3 Blangkon Solo buah 234,000 Batik Tulis
4 Iket Lembaran lbr 268,000 Batik Tulis
5 Teni Rejo potong 410,000 Bludru halus bordir
6 Teni Prameswari potong 644,000 Bludru halus bordir
7 Teni Adipati potong 482,000 Bludru halus bordir
8 Rompi Peran potong 267,000 Bludru halus bordir
9 Rompi biasa potong 175,000 Saten halus list
10 Beskap potong 480,000 Bludru halus list
11 Surjan potong 480,000 Motif bunga / polos
12 Kebaya potong 400,000 Motif bunga / polos
13 Kebaya lurik potong 220,000 Lurik Tenun halus
14 Hem Wiron potong 235,000 Saten halus
15 Jubah potong 450,000 Saten halus
16 Sampur Tumpul buah 175,000 Tetoron
17 Srempang potong 370,000 Bludru bordir
18 Kain Batik potong 480,000 Batik tulis
19 Kain Lurik potong 175,000 Lurik Tenun halus
20 Celana Cinde potong 230,000 Batik halus
21 Celana Panji potong 230,000 Saten halus
22 Celana Komprang potong 230,000 Saten halus
23 Baju Wiron potong 230,000 Saten halus
24 Keris buah 230,000 Branggah/gayaman
25 Stagen/lontong buah 160,000 Dilapis Saten halus
26 Kamus/Timang Stel 267,000 Bludru/kuningan
27 Cenela Stel 230,000 Lapis bludru bordir
28 Besek tempat pakaian buah 175,000 Bahan bambu kulitan
b. GAYA MESIRAN :
1 Kanigoro Basuki buah 270,000 Bludru kucir lawe
2 Topi Dagelan buah 110,000 Saten halus
3 Teni potong 400,000 Bludru halus bordir
4 Rompi potong 750,000 Bludru halus list
5 Hem Wiron potong 322,000 Saten halus
6 Jubah potong 420,000 Saten halus
7 Serban potong 215,000 Saten halus
8 Sampur potong 215,000 Saten halus
9 Sampur Endhong potong 215,000 Saten halus
10 Sampur Nyamping potong 215,000 Saten halus
11 Rist potong 580,000 Bludru halus bordir
12 Celana potong 215,000 Saten halus
13 Besek tempat pakaian potong 175,000 Bahan bambu kulitan
c. KOSTUM DEWA GAGAH :
1 - Uncit Buah 117,000
2 - Baju Buah 234,000
3 - Celana Cindhe Buah 250,000
4 - Sebih Buah 117,000
2
NO NAMA BARANG SATUAN HARGA
Siter
Suling
Bedhug
Gayor Gong
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
KETERANGAN
(MERK/BAHAN)
40
1 3 4 5
5 - Stagen Buah 135,000
6 - Sampur Buah 160,000
7 - Kaweng Buah 117,000
8 - Bara Buah 80,000
9 - Jarik Buah 117,000
10 - Kamus Timang Buah 176,000
11 - Buntal Buah 267,000
12 - Kalung Tanggalan Buah 55,000
13 - Kelat Bahu Stel 80,000
14 - Praba Buah 535,000
15 - Sumping Stel 117,000
16 - Keris Oncen Buah 247,000
d. KOSTUM DEWA ALUS
1 -Dhampar Lembur Andhini Buah 535,000
2 -Uncit Buah 117,000
3 -Baju Bludru Buah 267,000
4 -Celana Cindhe Buah 175,000
5 -Sebih Buah 117,000
6 -Stagen Buah 135,000
7 -Sampur Cindhe Buah 160,000
8 -Bara Buah 80,000
9 -Jarik Buah 117,000
10 -Kamus Timang Buah 176,000
11 -Kalung Susun Buah 55,000
12 -Kelat Bahu Stel 80,000
13 -Praba Buah 535,000
14 -Sumping Stel 117,000
15 -Kris dan Oncen Buah 250,000
e. KOSTUM RAJA GAGAH
1 -Mekhuta/Tropong Buah 270,000
2 -Sumping Stel 117,000
3 -Kelat Bahu Stel 80,000
4 -Kaweng Buah 80,000
5 -Kalung Tanggalan Buah 58,000
6 -Stagen Buah 135,000
7 -Kamus Timang Buah 176,000
8 -Celana Buah 246,000
9 -Bara Buah 80,000
10 -Jarik Buah 160,000
11 -Sampur Cinde Buah 160,000
12 -Keris Buah 250,000
13 -Praba Buah 235,000
14 -Oren Buah 117,000
15 -Buntal Buah 267,000
f. KOSTUM WIDADARI
1 -Irah Irahan Buah 215,000
2 -Rompi Bludru Buah 267,000
3 -Sebih Buah 80,000
4 -Sampur Cindhe Buah 160,000
5 -Jarik Buah 160,000
6 -Slepe Buah 117,000
7 -Kelat Bahu Stel 160,000
8 -Sumping Stel 160,000
9 -Kalung Susun Buah 55,000
10 -Godheg Stel 53,000
11 -Cemara Buah 80,000
g. KOSTUM RASEKSA
1 -Irah Irahan Buah 267,000
2 -Sumping Stel 800,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Tanggalan Buah 50,000
5 -Baju Bludru Buah 234,000
6 -Celana Bludru Buah 160,000
7 -Kaweng Buah 117,000
8 -Kaos Tanggan Buah 32,000
9 -Kaos Kaki Buah 32,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
41
1 3 4 5
10 -Dhadhan Buah 80,000
11 -Stagen Buah 135,000
12 -Kamus Timang Buah 176,000
13 -Bara Buah 80,000
14 -Buntal Buah 267,000
15 -Klinthing Buah 43,000
16 -Praba Buah 535,000
17 -Jarik Buah 117,000
18 -Oren Buah 117,000
19 -Topeng Buah 215,000
20 -Sampur Cindhe Buah 160,000
h. KOSTUM PRAJURIT RASEKSA
1 -Irah Irahan Buah 267,000
2 -Sumping Stel 800,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Tanggalan Buah 50,000
5 -Srempang Buah 205,000
6 -Klining Buah 42,000
7 -Celana Polos Buah 245,000
8 -Kaweng Buah 117,000
9 -Stagen Buah 135,000
10 -Kamus Timang Buah 176,000
11 -Bara Buah 80,000
12 -Klinthing Buah 42,000
13 -Jarik Buah 117,000
14 -Oren Buah 117,000
15 -Sampur Polos Topeng Buah 160,000
i. KOSTUM RASEKSA JIN
1 -Irah Irahan Buah 215,000
2 -Sumping Stel 803,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Tanggalan Buah 50,000
5 -Baju Panjang Buah 135,000
6 -Celana Buah 246,000
7 -Kaweng Buah 117,000
8 -Kaos Tangan Buah 30,000
9 -Kaos Kaki Buah 30,000
10 -Stagen Buah 135,000
11 -Kamus Timang Buah 176,000
12 -Bara Buah 80,000
13 -Klinthing Buah 42,000
14 -Sayap Buah 21,500
15 -Jarik Buah 117,000
16 -Topeng Buah 215,000
17 -Sampur Polos (Gendhala Giri) Buah 160,000
g. KOSTUM WANARA
1 -Irah Irahan Buah 215,000
2 -Sumping Stel 803,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Tanggalan Buah 50,000
5 -Baju panjang Buah 145,000
6 -Celana Buah 246,000
7 -Kaweng Buah 117,000
8 -Kaos Tangan Buah 30,000
9 -Kaos Kaki Buah 30,000
10 -Dhadhan Buah 80,000
11 -Stagen Buah 135,000
12 -Kamus Timang Buah 176,000
13 -Bara Buah 80,000
14 -Klinthing Buah 42,000
15 -Jarik Buah 117,000
16 -Topeng Buah 215,000
17 -Sampur Polos (Gendhala Giri) Buah 175,000
h. KOSTUM RAJA WANARA
1 -Irah Irahan Buah 215,000
2 -Sumping Stel 117,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
42
1 3 4 5
3 -Kelat Bahu Stel 80,000
4 -Kalung Susun Buah 50,000
5 -Stagen Cindhe Buah 135,000
6 -Kamus Timang Buah 176,000
7 -Bara Buah 80,000
8 -Jarik Buah 107,000
9 -Keris Buah 247,000
10 -Celana Cindhe Buah 246,000
11 -Sampur Cindhe Buah 160,000
12 -Godheg Stel 30,000
i. KOSTUM SATRIYA GAGAH
1 -Irah Irahan Buah 215,000
2 -Sumping Stel 117,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Tanggalan Buah 50,000
5 -Kaweng Cindhe Buah 117,000
6 -Stagen Cindhe Buah 135,000
7 -Kamus Timang Buah 176,000
8 -Bara Buah 80,000
9 -Jarik Buah 117,000
10 -Buntal Buah 267,000
11 -Keris Buah 247,000
12 -Praba Buah 428,000
13 -Celana Cindhe Buah 246,000
14 -Sampur Cindhe Buah 160,000
j. KOSTUM SATRIYA ALUS
1 -Irah Irahan Buah 215,000
2 -Sumping Stel 117,000
3 -Kelat Bahu Stel 80,000
4 -Kalung Susun Buah 50,000
5 -Stagen Cindhe Buah 135,000
6 -Kamus Timang Buah 176,000
7 -Bara Buah 80,000
8 -Jarik Buah 117,000
9 -Keris Buah 247,000
10 -Celana Cindhe Buah 246,000
11 -Sampur Cindhe Buah 160,000
12 -Godheg Stel 30,000
k. KOSTUM PUTRI
1 -Irah Irahan Buah 215,000
2 -Rompi Bludru Buah 320,000
3 -Sampur Cindhe Buah 160,000
4 -Jarik Buah 117,000
5 -Slepe Buah 117,000
6 -Kelat Bahu Stel 80,000
7 -Sumping Stel 117,000
8 -Kalung Susun Buah 50,000
9 -Godheg Stel 30,000
10 -Cemara Buah 80,000
l. KOSTUM DHAYANG/ENDHANG
1 -Irah Irahan Buah 215,000
2 -Mekaka Buah 117,000
3 -Remong Sampur Cindhe Buah 50,000
4 -Jarik Buah 117,000
5 -Slepe Buah 117,000
6 -Kelat Bahu Stel 80,000
7 -Sumping Stel 117,000
8 -Kalung Susun Buah 50,000
9 -Godheg Stel 30,000
10 -Cemara Buah 50,000
m. KOSTUM PUNAKAWAN'
1 -Irah Irahan Buah 215,000
2 -Kalung Buah 50,000
3 -Senjata Buah 117,000
4 -Kopel Buah 117,000
5 -Jarik Buah 117,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
43
1 3 4 5
6 -Celana Buah 250,000
7 -Klinthing Buah 42,000
n. KOSTUM SENJATA
1 -Bindhi Buah 215,000
2 -Ghada Buah 215,000
3 -Jemparing Buah 215,000
4 -Panah Pasopati Buah 215,000
5 -Limpung Buah 215,000
o. KOSTUM HEWAN
1 -Peksi Buah 1,600,000
2 -Dirada Buah 1,600,000
3 -Wraha Buah 1,600,000
p. KOSTUM ANGGUK
1 -Topi Buah 215,000
2 -Baju Bludru Buah 320,000
3 -Celana Bludru Buah 246,000
4 -Sabuk (Kamus Timang) Buah 176,000
5 -Sampur Kain Paris Buah 80,000
6 -Kaos Kaki Buah 30,000
q. ALAT MUSIK JATHILAN
1 -Kendhang Buah 2,656,000
2 -Kempul Besi Buah 5,463,000
3 -Gong Suwukan Besi Buah 2,528,000
4 -Saron Demung (Besi) Buah 2,975,000
5 -Saron Ricik (Besi) Buah 2,350,000
6 -1 Set Bendhe (Besi) Set 2,250,000
7 -1 Set Angklung Set 2,150,000
8 Sewa Kostum unit 320,000
J. PERLENGKAPAN KENDARAAN DINAS
Harga termasuk pajak
1 3 4 5
1 ACCU / BATERAI
- NS 40 HYB buah 670,000 GS Hybrid
- NS 40 Z HYB buah 718,000 GS Hybrid
- NS 40 ZL HYB buah 718,000 GS Hybrid
- NS 60 HYB buah 782,000 GS Hybrid
- NS 60 S HYB buah 782,000 GS Hybrid
- NS 60 L HYB buah 782,000 GS Hybrid
- N 50 50 AH buah 831,000 GS Hybrid
- N 50 L 50 AH buah 964,000 GS Hybrid
- NS 70 HYB buah 1,055,000 GS Hybrid
- N 70 HYB buah 1,205,000 GS Hybrid
- N 70 Z HYB buah 1,275,000 GS Hybrid
- N 100 HYB buah 1,548,000 GS Hybrid
- N 50 Z HYB buah 965,000 GS Hybrid
- 80 D2GL GS buah 1,525,000 GS Hybrid
- Accu Motor (basah) buah 180,000 GS Astra
- Accu Motor (kering) buah 255,000 GS Astra
- Accu Motor buah 525,000 YUASA YTX 7 L
2 BAN LUAR
- Sepeda Motor Matic belakang buah 176,800 FDR
- Sepeda Motor Matic depan buah 143,500 FDR
- Sepeda Motor belakang buah 410,000 IRC/FDR
- Sepeda motor depan buah 187,500 IRC/FDR
- Sepeda motor bebek belakang buah 177,000 IRC/FDR
- Sepeda motor bebek depan buah 145,000 IRC/FDR
- Sepeda motor sport belakang buah 273,000 FDR
- Sepeda motor sport depan buah 246,000 FDR
- Sepeda motor trail depan buah 430,000 FDR
- Sepeda motor trail belakang buah 540,000 FDR
- Sepeda motor roda tiga depan buah 345,000
- Sepeda motor roda tiga belakang buah 380,000
2
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
44
1 3 4 5
3 BAN DALAM
- Sepada motor buah 45,000
- Sepada motor matic buah 37,500 FDR
- Sepada motor bebek buah 37,500 FDR
- Sepada motor sport buah 48,000 FDR
- Sepada motor trail buah 48,000 FDR
- Sepada motor roda tiga buah 58,900
- Mobil R 12 buah 91,000
- Mobil R 13 GT buah 107,000
- Mobil R 14 GT buah 128,500
- Mobil R 16 GT buah 192,800
4 BAN LUAR MOBIL
a. Merk Gajah Tunggal
- 550 - 13 6 PR buah 450,000 Super
- 550 - 13 8 PR buah 485,000 Super
- 600 - 13 6 PR buah 495,000 Super
- 600 - 13 8 PR buah 793,000 Super
- 640 - 13 6 PR buah 485,000 Super 88
- 640 - 13 8 PR buah 477,000 Super / S88
- 600 - 14 8 PR buah 713,000 Super / S88 N
- 700 - 14 6 PR buah 590,000 Super
- 700 - 14 8 PR buah 600,000 Super
- 650 - 15 8 PR buah 964,000 Super
- 700 - 15 6 PR MTR buah 1,767,500
- 750 - 15 10 PR buah 1,770,000 Super 88 N/ LUG
- 750 - 15 12 PR buah 1,100,000 Super 88 N/ LUG
- 700 - 16 10 PR buah 1,548,000 Super 88 N/ LUG
- 700 - 16 12 PR buah 1,548,000 Super 88 N/ LUG
- 700 - 16 14 PR buah 1,050,000 Super 88
- 750 - 16 12 PR buah 1,907,000 Super /LUG/S.TR
- 750 - 16 14 PR buah 1,450,000 Super 88 N
- 750 - 16 14 PR buah 1,350,000 Super 88 N/ LUG
- 825 - 16 14 PR buah 2,014,000 Super 88 N/ LUG
b. Merk Bridgestone
TECHNO ( Seri 80)
- 155/80 SR12 B-250 T buah 400,000
- 155/80 SR13 S-248 T buah 800,000
- 165/80 SR13 S-250 T buah 770,000
- 175/80 SR14 S-248 T buah 880,000
- 185/80 SR14 S-250 T buah 850,000
TECHNO B-250 ( Seri 70) BRIDGESTONE
- 155/80 SR12 B-250 T buah 503,000
- 175/70 SR12 B-250 T buah 530,000
- 165/70 SR13 S-250 T buah 583,800
- 175/70 SR13 B-250 T buah 500,000
- 185/70 SR13 B-250 T buah 780,000
- 185/70 SR14 S-250 T buah 825,000
- 195/70 SR14 T- 250 T buah 800,000
- 185/70 SR14 T- 370 T buah 780,000
- 195/70 SR14 T- 370 T buah 825,000
TURANZA AR-10 (Seri 70) BRIDGESTONE
- 175/70 HR 13 AR- 10 T B 250 buah 850,000
- 185/70 HR 13 AR- 10 T buah 840,000
- 185/70 HR 14 AR- 10 T buah 900,000
- 195/70 HR 14 AR- 10 T buah 830,000
TURANZA AR-10 (Seri 65) BRIDGESTONE
- 165/65 HR 13 AR- 10 T buah 718,000
- 175 65 HR 14 AR- 10 T buah 654,000
- 185/65 HR 14 AR- 10 T buah 932,000
- 195/65 HR 14 AR- 10 T buah 798,000
- 185/65 HR 15 AR- 10 T (IMP) buah 857,000
- 185/65 HR 15 AR- 10 T buah 1,125,000
- 195/65 HR 15 AR- 20 T buah 1,150,000
- 205/65 HR 15 AR- 10 T buah 1,250,000
- 215/65 HR 15 AR- 10 T buah 1,370,000
- 215/65 HR 16 AR- 10 T buah 1,820,000
2
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
45
1 3 4 5
DUELER
- 225/65 HR 17 D-680 T LVR buah 2,000,000
- 185 R 14 6 PR R-623 T buah 900,000
5 O L I
a. Oli Mesin :
- Oli kendaraan masa garansi Liter 85,000
- Mesran Super Galon 150,000
Liter 55,000
- Penzoil Liter 55,000
- Meditran Liter 55,000
- B 40 Galon 330,000
- Grand Liter 60,000
0,8 Liter 55,000
- Top One Liter 75,000
0,8 Liter 60,000
- Mesran Prima Galon 188,000
- Fastron Liter 100,000
- Mobil Super S 10/40 Galon 375,000
- Shell Hilix HX3 1 liter 70,000
4 liter 193,000
- Shell Hilix HX5 1 liter 85,000
4 liter 290,000
- Shell Hilix HX7 1 liter 115,000
4 liter 370,000
- Shell Hilix ULTRA 1 liter 150,000
4 liter 910,000
- Shell Hilix Diesel HX 5 1 liter 110,000
5 liter 343,000
- Shell Hilix Diesel HX 7 1 liter 107,000
5 liter 485,000
- Remula R 2.40 1 liter 55,000
5 liter 180,000
- Remula R 2 EXSTRA 1 liter 60,000
5 liter 247,000
- Remula R 3 5 liter 397,000
b. Oli Gardan dan Presneleng Rored Galon 220,000 4 liter
Liter 55,000
c. Minyak Rem :
- Preston B.Kecil 35,000
B.Besar 110,000
- Wagner B.Kecil 35,000
B.Besar 110,000
6 Kanebo 1 bh 55,000
7 Isi FREON 1 kali 600,000
8 Perbaikan AC 1 kali 1,500,000
9 Car Amplifier :
- ZA-20 C 10 watt unit 800,000
- ZA-250 S 25 watt unit 950,000
10 Car Horn Speaker :
- ZH-610 S 10 watt unit 370,000
- ZH-615 S 15 watt unit 450,000
11 Dongkrak :
- Dongkrak Buaya 2-3 ton Unit 815,000 krisbow
- Dongkrak Buaya 10 ton Unit 10,100,000 tekiro
- Dongkrak Botol 2-3 ton Unit 330,000 genesis
- Dongkrak Botol 10 ton Unit 500,000 genesis
- Dongkrak Gunting 2-3 ton Unit 810,000 lakoni
- Dongkrak Gunting 10 ton Unit 1,150,000 lakoni
K. BIAYA EKSPLOITASI KENDARAAN DINAS DAN BAHAN BAKAR
Harga termasuk pajak
1 3 4
1. RODA 2 (DUA) / RODA 3 (TIGA)
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
NAMA BARANG
2
KETERANGAN
(MERK/BAHAN)NO HARGA
46
1 3 4
a. Reparasi dan Penggantian Suku Cadang :
- 1 - 2 tahun 3 kali x Rp. 350.000 1,050,000
- 3 - 4 tahun 3 kali x Rp. 575.000 1,725,000
- 5 tahun ke atas 3 kali x Rp. 685.000 2,055,000
b. Biaya Service 6 kali x Rp. 85.000 510,000
c. Pelumas
- Oli Mesin = 1 liter x 6 kali x Harga Oli Mesin. 330,000
- Oli Rem = 1 Botol Kecil x 1 kali x Harga oli rem. 35,000
d. Lain-lain :
2. RODA 4 (EMPAT)
a. Reparasi dan Penggantian Suku Cadang :
- 1 - 2 tahun 3 kali x Rp. 1.200.000 3,600,000
- 3 - 4 tahun 3 kali x Rp. 2.125.000 6,375,000
- 5 tahun ke atas 3 kali x Rp. 3.500.000 10,500,000
b. Biaya Service 6 kali x Rp. 180.000 1,080,000
c. Pelumas :
- Oli Mesin = 4 liter x 10 kali x Harga oli mesin. 2,600,000
- Oli Gardan = 2 liter x 3 kali x Harga oli gardan. 330,000
- Oli Persneleng = 2 liter x 3 kali x Harga oli persneleng. 330,000
- Oli Rem = 1 Botol Besar x 1 kali x Harga oli rem. 110,000
d. Biaya Pengujian Kendaraan 2 kali x Rp. 180.000 360,000
e. Biaya General Check-Up Kendaraan 200,000
f. Lain-lain :
3. RODA 6 (ENAM)
a. Reparasi dan Penggantian Suku Cadang :
- 1 - 2 tahun 3 kali x Rp. 2.000.000 6,000,000
- 3 - 4 tahun 3 kali x Rp. 3.100.000 9,300,000
- 5 tahun ke atas 3 kali x Rp. 4.200.000 12,600,000
b. Biaya Service 6 kali x Rp. 480.000 2,880,000
c. Pelumas
- Oli Mesin = 8 liter x 10 kali x Harga oli mesin. 5,200,000
- Oli Gardan = 4 liter x 3 kali x Harga oli gardan. 660,000
- Oli Persneleng = 4 liter x 3 kali x Harga oli persneleng. 660,000
- Oli Rem = 1 Botol Besar x 1 kali x Harga oli rem. 110,000
d. Biaya Pengujian Kendaraan 2 kali x Rp. 200.000 400,000
e. Lain-lain :
Catatan :
2. BBM menggunakan satuan liter dengan mengacu harga standar yang ditetapkan oleh Pemerintah.
3.
4.
1. Alat Pertanian
1 3 4 5
1 V Belt B.41 Buah 38,500 Bando
2 V Belt B.70 Buah 66,000 Bando
3 V Belt B.75 Buah 70,500 Bando
4 V Belt B.80 Buah 75,500 Bando
5 V Belt B.85 Buah 80,000 Bando
NO HARGA KETERANGAN
(MERK/BAHAN)NAMA BARANG
2
L. PERTANIAN, PERIKANAN DAN KELAUTAN
Harga termasuk pajak
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
harga mengacu pada huruf (J)
perlengkapan kendaraan dinas
SHBJ ini.
1. Untuk perlengkapan kendaraan dinas Bupati/Wakil Bupati/Sekda/Pimpinan DPRD karena spesifikasi
khusus dapat melebihi standarisasi.
Untuk kendaraan yang masih sebagian dalam masa garansi, biaya pemeliharaan kendaraan berlaku
ketentuan pada perusahaan pemberi garansi.
harga mengacu pada huruf (J)
perlengkapan kendaraan dinas
SHBJ ini.
harga mengacu pada huruf (J)
perlengkapan kendaraan dinas
SHBJ ini.
Besaran perpanjangan STNK mengacu standar tarif
yang ditetapkan Pemerintah
Untuk kendaraan roda 4 (empat) dengan kapasitas oli mesin lebih dari 4 liter menyesuaikan dengan
kapasitas CC kendaraan.
Besaran perpanjangan STNK mengacu standar tarif
yang ditetapkan Pemerintah
Besaran perpanjangan STNK mengacu standar tarif
yang ditetapkan Pemerintah
2
47
1 3 4
6 Peso Rotari Set 1,000,000 Yanmar
7 Peso Rotari Set 1,500,000 Taiwan asli ( BB )
8 Peso Rotari Set 1,600,000 Kubota
9 Kampas kopling Set 41,500 Yanmar
10 Kampas kopling Set 45,000 Kubota
11 Kawat kopling pembelok Buah 78,000 Kubota
12 Laker roda traktor (Koyo) Buah 65,000 6205 LLU
13 Laker roda traktor (Koyo) Buah 63,000 6206 Biasa
14 Ban traktor roda karet Set 2,300,000 8,3-22 + pelek Kubota
15 Kawat gas hand traktor Buah 48,500
16 Elektrode Buah 189,000 2,6(RB 26) per 5 kg
17 Elektrode Buah 194,000 3,2(RB 26) per 5 kg
18 Ring Piston Buah 210,000 NM 185
19 Ring Piston Buah 202,000 RD 85
20 Stang seker Buah 756,000 Yanmar NM 105
21 Stang seker Buah 450,000 RB 85
22 V Belt A.41 Buah 26,000 Bando
23 V Belt A.65 Buah 41,000 Bando
24 V Belt A.70 Buah 44,000 Bando
25 Hand Sprayer Buah 513,000 10 lt stainless Steel Swan
26 Hand Sprayer Buah 550,000 14 ltr Swan
27 Hand Sprayer Buah 564,000 14 ltr Golden Agin
28 Hand Sprayer Buah 650,000 17 ltr Golden Agin
29 Buah 4,900,000
SanchinSC30+Diesel Honda/
Paket selang 50 m + stick +
frame
30 Power Sprayer dengan perlengkapan Buah 4,900,000 Honda GX 160
31 Mish Blower Buah 2,600,000
32 Mesin Fogging Swingfog SN 50 Buah 34,496,000 Made in Jerman
33 Blander Buah 402,000
34 Blander Las / Bakar Buah 440,000
35 Emposan Buah 273,000
36 Masker Buah 55,000 filter double
37 Sarung tangan Buah 100,000 Las
38 Jaring serangga Buah 40,000
39 Ombo meter (Penakar curah hujan) Buah 2,152,000 Stainless Steel
40 Ombo meter (Penakar curah hujan) Buah 1,572,000
41 Cangkul sambung Buah 104,000
42 Cangkul serua Buah 80,500
43 Dandang Buah 168,000
44 Gathul/Garu Buah 40,000
45 Linggis 20 Pro HD Buah 66,000
46 Tripoit (kereta sorong) Buah 700,000 dragon fly
47 Gunting Pangkas Buah 150,000 RRC
48 Gunting Pangkas Buah 260,000 Selery
49 Gunting Stek Buah 175,000 Cap Mata
50 Gunting Stek Buah 160,000 Felco / Falcon
51 Gunting Stek Buah 105,000 Prohex
52 Gunting Stek Buah 189,500 Prohex
53 Deklit 6 x 8 Buah 466,000 Lumba-lumba
54 Deklit 5 x 7 Buah 157,000 Lumba-lumba
55
- G 1000 RD 85 DI-2 Unit 29,645,000 roda tapak lebar
- G 1000 RD 85 DI-2 Unit 29,950,000 roda tapak panjang
- E 85 RD 85 DI-2 Unit 27,720,000
- E 85 RD 85 DI-2 Unit 28,535,000 dengan selang panjang
- TL 800 RD 85 DI-2 Unit 27,500,000
- G 3000 RD 85 DI-1 Unit 29,700,000
- G 1000 RD 85 DI-1 Unit 28,740,000
- G 1000 RD 85 DI-1 Unit 29,200,000 roda tapak lebar
- G 1000 RD 85 DI-1 Unit 29,450,000 roda tapak panjang
- E 85 RD 85 DI-1 Unit 27,500,000
- TL 800 RD 85 DI-1 Unit 27,500,000
- G 3000 RD 105 DI-2 Unit 33,275,000
- G 1000 RD 105 DI-2 Unit 32,285,000
Power Sprayer dengan perlengkapan
Traktor tangan Quick dengan diesel
KUBOTA dengan perlengkapan standart :
NO NAMA BARANG HARGA KETERANGAN
(MERK/BAHAN)
2
48
1 3 4
- G 1000 RD 105 DI-2 Unit 32,670,000 roda tapak lebar
- G 1000 RD 105 DI-2 Unit 33,000,000 roda tapak panjang
- G 600 RD 65 L Unit 25,000,000
- G 600 RD 65 L DI 15 Unit 23,450,000
- G 600 RD 65 L DI 25 Unit 23,870,000
- ZENA RD 110 DI-2T Unit 45,375,000
56 Light Trap Tenaga Surya Unit 700,000 Home Industri
57 Threser Bermotor Unit 5,900,000
58 Pompa air ukuran 2" SCR Unit 4,500,000 Mesin Honda GX-120
59 Pompa air ukuran 2" HONDA Unit 4,000,000 Mesin Honda GX 160
60 Pompa air ukuran 3" SCR Unit 4,500,000 Mesin Honda GX 150
61 Pompa air ukuran 3" HONDA Unit 5,000,000 Mesin Honda GX 160
62 Pompa air ukuran 4" Niagara Unit 24,200,000 Mesin Kubota 11,5 PK
63 Selang Hisap ukuran 2" Meter 35,000 Trilliun/Milyard
64 Selang Hisap ukuran 3" Meter 69,300 Trilliun/Milyard
65 Selang Hisap ukuran 4" Meter 99,000 Trilliun/Milyard
66 Selang Buang ukuran 2" Meter 21,000 Maspion
67 Selang Buang ukuran 3" Meter 32,000 Maspion
68 Selang Buang ukuran 4" Meter 57,800 Maspion
69 Sealer 30 cm buah 600,000 Impulse
70 Timbangan duduk buah 5,000,000 Janaka
71 Timbangan duduk buah 3,500,000 Cahaya Adil 50 kg
72 Timbangan digital buah 3,000,000 Logan
73 Timbangan digital buah 1,400,000 Tora 30 kg
74 Alat ubinan buah 3,500,000
75 Termohygrometer buah 400,000
76 Mulsa plastik hitam perak 18 kg 900,000 Bell
77 tajar ( baja plastik ) batang 10,000 Takiron
2. Peralatan Nelayan dan Budidaya Ikan
Harga termasuk pajak
1 3 4 5
1 Perahu katir <3 GT (kasko) unit 23,566,000
2 Perahu katir <1 GT (kasko) unit 10,200,000
3 Mesin PMT 15 PK unit 35,136,750 Yamaha
4 Mesin PMT 15 PK unit 30,451,850 Suzuki
5 Jaring serang 4.5 inch set 660,000
6 Jaring serang 5.5 inch set 715,000
Jaring milenium :
Jaring Milenium 5 inch set 2,900,000
Jaring Milenium 6 inch set 3,100,000
Jaring Milenium 7 inch set 3,300,000
8 Baju pelampung unit 350,000
9 Jaring eret 3.5 inch set 780,000
10 Jaring eret 5.5 inch set 1,100,000
11 Jaring eret 7 inch set 1,500,000
12 Jaring insang 3.5 inch set 500,000
13 Jala tebar set 2,000,000
14 HDPE Black UV meter² 20,000 eceran
15 Blong panen buah 330,000
16 Ember ukuran buah 37,500
17 Kolam bulat diameter 3 m unit 1,940,000
Full set(kerangka besi, terpal
vinil, pipa paralon, karpet
talang, dan sarana penunjang)
18 Kolam bulat diameter 2 m unit 1,200,000
Full set(kerangka besi, terpal
vinil, pipa paralon, karpet
talang, dan sarana penunjang)
19 Bahan biologis air kolam 0.5 liter 25,000 0.5 liter
20 Bahan biologis pakan ikan 0.5 liter 25,000 0.5 liter
21 Jaring penutup kolam rol 400,000
22 Probiotik ikan botol 42,000
KETERANGAN
(MERK/BAHAN)
2
2
7
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
NO NAMA BARANG HARGA
49
1 3 4 5
23 Kapur pertanian zak 8,400
24 Plastik angkut benih Kg 32,000
25 Ijuk Ikat 52,500
26 Jaring hapa Ikat 225,000
27 Heater buah 105,000
28 Seser buah 52,500
29 Bahan biologis (probiotik SPF 0.5 Lt) botol 40,000 0.5 liter
30 Bahan biologis (probiotik Raja lele 1 Lt) botol 50,000 1 liter
31 Bahan biologis (probiotik Raja gurami 1 Lt) botol 50,000 1 liter
32 Multivitamin ikan buah 75,000
33 Vitamin C ikan buah 40,000
34 Vaksin ikan buah 150,000
35 Uji sampel logam berat ikan sampel 250,000
36 Uji sampel penyakit ikan sampel 600,000
3. Pupuk dan Obat-obatan Tanaman
1 3 4 5
1 Urea kg 6,500 HET (Harga Eceran Tertinggi)
2 SP-36 / TSP kg 10,000 HET (Harga Eceran Tertinggi)
3 ZA kg 6,500 HET (Harga Eceran Tertinggi)
4 ZA Zak 200,000
KCL (Kanada) Zak 400,000 HET Non Subsidi
kg 10,300
6 NPK Phonska kg 13,000 HET Non Subsidi
20 kg 190,000 HET Non Subsidi
7 NPK Mutiara kg 13,200 HET Non Subsidi
8 Pupuk Organik (Petroganik) kg 1,500 HET (Harga Eceran Tertinggi)
9 kg 1,300 HET (Harga Eceran Tertinggi)
10 Petrogenol Botol 16,000 5 cc
11 Fungisida :
- Fungisida 250 ml Botol 190,000 250 ml
- Daconil Buah 106,000 500 gram
- Dhitane M 45 Buah 121,000 1000 gram
- Manzate Buah 112,000 1000 gram
- Score 250 EC Botol 192,500 250ml
- Bion M 500 G Botol 188,000 500 gram
- Nordox Sachet 31,000 100 gram
- score 250 EC Botol 203,000 250 ml
12 Herbisida Goal 2 E Botol 65,000 100 ml
13 Insektisida :
- Bassa Botol 32,000 100 ml
- Antracol 70 WP Botol 140,000 1000 gram
- Plenum Botol 55,000 50 gram
- Applaud 10 WP Botol 100,000 1000 gram
- Baycarb 500 EC Botol 150,000 500 ml
- Buldog 25 EC Botol 100,000 100 ml
- Confidor 5 WP Botol 35,000 100 gram
- Curacron 500 EC Botol 250,000 500 ml
- Curacron 500 EC Botol 50,000 100 ml
- Decis 25 EC Botol 34,200 100 ml
- Dharmabas 500 EC Botol 70,000 500 ml
- Diazinon 60 Ec Botol 31,500 100 ml
- Dursban 20 EC Botol 100,000 500 ml
- Marshal 200 EC Botol 80,000 500 ml
- Matador 25 EC Botol 24,500 80 ml
- Mipcin Botol 16,000 100 gram
- Pegasus Botol 80,000 80 ml
- Regent 50 SC Botol 34,500 100 ml
- Poriza Botol 30,000 200 ml
13 - Beauveria bassiana kg 75,000 1 kilogram
- Beauveria bassiana plastk 46,500 100 gram
- Beauveria bassiana BVR plastk 42,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
5
Pupuk Organik (Petroganik) Fine
Harga termasuk pajak
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
50
1 3 4 5
- Tricoderma harsianum kg 41,000 100 gram / kg
- Tricoderma harsianum plastk 34,000 100 gram
- Corrin Bacterium Botol 33,500 1 ltr
Botol 32,000 1 ltr
14 Karbuforan
- Curater 3 G kg 60,000 2 kg
- Furadan 3 G kg 45,000 2 kg
- Regent 0,3 G kg 33,000 1 kg
- Regent 100 ml Botol 36,000 1 Botol / 100 ml
- Marshal 5 G kg 36,000 1 kg
15 Rodentisida
- Klerat R-MB kg 95,000 1 kg
- Petrocum Sachet 11,000
4. Obat-obatan Hewan
1 3 4 5
1 Flukicide 12,5% 100 ml 65,000
2 Flukicide 12,5% liter 535,600 1 liter
3 Althelmetika Piperazine 1 liter liter 123,000 1 liter
4 Ivomec Super 50 ml botol 605,000 50 ml
5 Gusanex buah 171,000
6 Aquadest 100 ml botol 7,000 100 ml
7 Injektamin 100 ml botol 130,000 100 ml
8 Biosan TP 100 ml botol 155,000 100 ml
9 Dovenic 50 ml botol 312,000 50 ml
10 Vetadryl 100 ml botol 58,000 100 ml
11 Sulfidon 100 ml botol 72,000 100 ml
12 Limoxin LA 100 ml botol 120,000 100 ml
13 Penstrep 100 ml botol 138,750 100 ml
14 Terramycin Salep Mata buah 21,000
15 Vitol ADE 100 ml botol 117,000 100 ml
16 Vitamin B 1 100 ml botol 64,000 100 ml
17 Vitamin B 12 100 ml botol 87,500 100 ml
18 Ciano cobalamine injeksi 100 ml botol 97,000 100 ml, Sanbe
19 Vit B12 100 ml botol 61,000 100 ml, Woner
20 Vitamin B Komplek 100 ml botol 45,000 100 ml
21 Yodium Povidone 10% 1 liter liter 85,000 1 liter
22 Calcidex Plus 100 ml botol 82,000 100 ml
23 Lidocaine 2 ml botol 5,300 2 ml
24 Oxytocin 50 ml botol 86,000 50 ml
25 Calibact Injeksi 100 ml botol 139,000 100 ml
26 Intramox 150 LA buah 250,000
27 Formades 1 liter liter 83,000 1 liter
28 Carbasunt Salep Luka buah 15,000
29 Livertrans Salep buah 6,000
5. Tanaman dan Hewan
1 3 4 5
1 Benih :
- Jarak Kg 280,000 Balitro
- Jarak Pagar Butir 500,000
- Kelapa Butir 12,000 Petani/BPT
- Tembakau Kg 300,000 Penangkar
2 Tanaman Hias :
- Cemara 1 tahun Batang 7,000
- Palm Merah Batang 45,500 50-60 CM
3 Bibit :
- Bibit Durian sambung pucuk Batang 57,000 60 - 75 cm
- Bibit Durian sambung Pucuk Batang 70,000 61 - 75 cm montong
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
KETERANGAN
(MERK/BAHAN)
2
Harga termasuk pajak
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
- ZPT Organik/PGPR (plant Growth
Harga termasuk pajak
NO NAMA BARANG SATUAN HARGA
2
2
51
1 3 4 5
- Bibit Jeruk okulasi Batang 30,000 50 - 60 cm
- Bibit Jeruk Okulasi Batang 30,000 51 - 60 cm keprok
- Bibit Mangga Batang 55,000 50 - 60 cm
- Bibit Mangga Batang 55,000 51 - 60 cm arum manis, madu
- Bibit Manggis seling Batang 45,000 50 - 60 cm / 80 cm
- Bibit Manggis seling Batang 115,000 51 - 60 cm sambung / 80 cm
- Durian Okulasi/menoreh kuning Pohon 55,000 50 - 60 cm/Menoreh Kuning
- Durian Okulasi/menoreh kuning Pohon 75,000 80 cm/Menoreh Kuning
- Jambu air Okulasi/sambung 60-70 cm Pohon 31,000 50 - 60 cm
- Jambu air okulasi/ sambung 60-70 cm Pohon 65,000 51 - 60 cm madu jelly
- Jeruk Okulasi/sambung Pohon 30,000
- Rambutan Okulasi/sambung Pohon 50,000 50 - 60 cm / 80 - 100 cm
- Rambutan Okulasi/sambung Pohon 55,000 51 - 60 cm binjai/80 - 100 cm
- Rambutan rafia Pohon 45,000 50-60 cm
- Salak Pohon 30,000
- Panili UGM Batang 8,000 30 - 50 cm
- Panili Lokal Batang 4,000 30 - 50 cm
- Cicompu Batang 3,000 40 - 50 cm
- Kakao seling Pohon 52,500 30 - 50 cm
- Srikaya Pohon 55,000 60 dari okulasi
- Kelengkeng okulasi Diamond rever Pohon 65,000 40 - 50 cm
- Kelengkeng okulasi Pingpong Pohon 62,500 40 - 50 cm
- Kelengkeng okulasi Itoh/Edauw Super Pohon 110,000 40 cm dari mata sambung
- Kelengkeng okulasi Itoh biasa Pohon 80,000 60 - 65 cm dari okulasi
- Kelengkeng okulasi Kristalin Pohon 65,000 40 - 50 cm
- Duku Pohon 45,000 40 - 50 cm
Pohon 78,000 60 - 70 cm
4 Perkebunan :
- Bibit Albasia/sengon Batang 7,000 40 - 50 cm / 100
- Bibit Kakao (seedling) Batang 25,000 30 - 40 cm
- Bibit Kakao (sambung) Batang 35,000 30 - 40 cm
- Bibit Cengkeh Batang 20,000 30 - 40 cm
- Bibit Akasia Batang 8,000 30 - 40 cm
- Bibit Asam Batang 25,000
- Bibit Asam Kranji Batang 10,000
- Eukaliptus Batang 6,000
- Bibit Jati Batang 10,000 30 - 40 cm bersertifikat
- Bibit Jarak Pagar Batang 8,000 30 - 40 cm
- Bibit Kelapa Batang 20,000 Daun 4-5, berujung bulat
- Bibit Kepel Batang 55,000 110 - 160 cm
- Mahoni 50 cm Batang 16,000
- Munggur 50 cm Batang 5,000
- Nangka 50 cm Batang 42,000
- Nangka (unggul bersertifikat) Batang 90,000 70 - 80 cm
- Bibit Tanjung Batang 25,000
5 Benih Ikan :
- Benur Vaname ( 1-2 cm ) Ekor 80
- Benur Lobster (50 gr) Ekor 28,000
- Gurami (5-8 cm) Ekor 2,000
- Gurami (8-12 cm) Ekor 3,500
- Gurami (12- 15 cm) Ekor 6,000
- Lele (5 cm) Ekor 200
- Lele (6 cm) Ekor 250
- Lele (7 cm) Ekor 300
- Lele (8 cm) Ekor 350
- Lele (9 cm) Ekor 400
- Nila kg 35,000 isi 40 - 70 ekor
- Grass Carp (3-5 cm) Ekor 130
- Grass Carp (5-8 cm) Ekor 180
- Grass Carp (8-12 cm) Ekor 380
- Tawes (3-5 cm) Ekor 130
- Tawes (5-8 cm) Ekor 180
- Tawes (8-12 cm) Ekor 380
- Ikan Lokal Tawar Ekor 550
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
52
1 3 4 5
6 Calon Induk Ikan :
- Calon Induk Gurami paket 350,000 berat /ekor < 600 gr (/paket 4
ekor)
- Calon Induk Lele paket 500,000 berat /ekor 400- 500 gr (/paket
15 ekor)
- Calon Induk Lele paket 850,000 berat /ekor > 600 gr (/paket 15
ekor)
- Calon Induk Nila paket 4,000,000 berat /ekor > 200 gr (/paket
400 ekor)
7 Pakan :
Pakan Ikan Pembesaran kg 11,200
Pakan Induk Ikan kg 20,000
Pakan Benih Ikan kg 17,500
8 Peternakan :
- Domba lokal betina ekor 1,850,000 TG : 45 cm
- Domba lokal jantan ekor 2,500,000 TG : 55 cm
- Domba ekor gemuk betina ekor 2,800,000 TG : 55 cm
- Domba ekor gemuk jantan ekor 3,450,000 TG : 60 cm
- Kambing Kejobong Betina ekor 1,450,000
- Kambing Kejobong Jantan ekor 2,200,000
- Kambing PE Grade A Jantan ekor 12,300,000 TG : 80 cm
- Kambing PE Grade A Betina ekor 8,600,000 TG : 75 cm
- Kambing PE Grade B Jantan ekor 8,850,000 TG : 75 cm
- Kambing PE Grade B Betina ekor 5,150,000 TG : 70 cm
- Kambing PE Grade C Jantan ekor 5,800,000 TG : 70 cm
- Kambing PE Grade C Betina ekor 3,700,000 TG : 65 cm
- Kambing Bligon betina ekor 1,650,000 TG : 60 cm
- Kambing Bligon jantan ekor 2,750,000 TG : 70 cm
- Sapi PO betina ekor 15,950,000 1,5 th
- Sapi PO jantan ekor 19,650,000 2,5 th
- Sapi Kebumen Betina ekor 18,000,000 1,5 th
- Sapi Kebumen Jantan ekor 25,000,000 2,5 th
- Sapi putih betina produktif ekor 16,550,000 TG : 120 cm
- Ayam Buras Jantan ekor 160,000
- Ayam Buras Betina ekor 110,000
M. REAGEN, BAHAN HABIS PAKAI DAN ALAT-ALAT LABORATORIUM
Harga termasuk pajak
1 3 4 5
a. REAGEN :
1 CRM Sulfat 1000 ppm 100 ml 1,770,000 Merck
2 CRM Nitrat 1000 ppm 100 ml 1,770,000 Merck
3 CRM Nitrit 1000 ppm 100 ml 1,770,000 Merck
4 CRM Fluorida 1000 ppm 100 ml 1,875,000 Merck
5 CRM Manganese 1000 ppm 100 ml 1,928,000 Merck
6 CRM Iron 1000 ppm 100 ml 1,928,000 Merck
7 CRM Kesadahan 1000 ppm 100 ml 2,250,000 Merck
8 CRM Chlorida 1000 ppm 100 ml 1,770,000 Merck
9 Hg SO4 (Mercury II Sulfat) 50 gr 2,687,000 Merck
10 Kalium Permangat 250 gr 1,815,000 Merck
11 Kalium Chromat (K2CrO4) 1 kg 9,686,000 Merck
12 Kalium Chromat (K2CrO4) 500 gr 5,206,000 Merck
13 Kalium Chromat (K2CrO4) 250 gr 3,811,000 Merck
14 Kalium Dichromat (K2Cr2O7) 500 gr 3,636,000 Merck
15 Kalium Peroxodisulfat 250 gr 998,000 Merck
16 Kalium Nitrat/potasium nitrat 500 gr 1,076,000 Merck
17 Natrium Arsenit Solution 1 L 1,780,000 Merck
18 Natrium Clorida (NaCl) 1 Kg 1,364,000 Merck
19 Natrium Asetat 250 gr 1,171,000 Merck
20 Ammonia 25% 2,5 L 1,427,000 Merck
21 Ammonia Peroxodisulfat 500 gr 1,515,000 Merck
22 Asam Asetat Glacial 100% 2,5 L 907,000 Merck
KETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGA
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
53
1 3 4 5
23 Asam Klorida Pekat 37% 2,5 L 2,682,000 Merck
24 Asam Klorida 2,5 L 2,035,000 Merck
25 Asam Nitrat 69-70% 2,5 L 2,785,000 Merck
26 Asam Pospat 85% 1 L 2,380,000 Merck
27 Asam Sulfat (H2SO4) 2,5 L 2,682,000 Merck
28 Sodium Hydrogen Sulfat 1 L 1,745,000 Merck
29 Hyidrogen Peroksida 30% H2O2 1 L 2,840,000 Merck
30 Ammonium Hidroksida (NH4OH) 2,5 L 1,346,000 Merck
31 Ammonium Chlorida (NH4Cl) 500 gr 1,335,000 Merck
32 Ammonium Chlorid Anhidrat 500 gr 1,420,000 Merck
33 Ammonium Asetat 500 gr 1,505,000 Merck
34 Buffer Solution pH 4 1 L 2,367,000 Merck
35 Buffer Solution pH 7 1 L 2,355,000 Merck
36 Buffer Solution pH 10 1 L 1,960,000 Merck
37 Barium Chlorid Dihydrat 1 kg 1,760,000 Merck
38 Calcium Carbonat (CaCO3) 250 gr 1,165,000 Merck
39 Magnesium Chlorid Hexahydrat 250 gr 1,182,000 Merck
40 Magnesium Sulfat Heptahydrat 500 gr 1,340,000 Merck
41 Phenanthrolin Monohydrat 5 gr 1,500,000 Merck
42 Phenanthrolin Monohydrat 10 gr 2,990,000 Merck
43 Hidroksilamin Hidroklorida 250 gr 4,665,000 Merck
44 Sulfanilic Acid 250 gr 2,605,000 Merck
45 Titripex III (EDTA) 250 gr 1,786,000 Merck
46 Zirkon (IV) Oxychlorid 100 gr 4,847,000 Merck
47 Zink Sulfat Heptahydrat 500 gr 1,302,000 Merck
48 N. Sulfat Hepthylamin Etilin (NED) 5 gr 1,875,000 Merck
49 Sulfanilamid 100 gr 4,069,000 Merck
50 Di Natrium Oxalat 250 gr 2,115,000 Merck
51 Eriochrome Black T 100 gr 4,365,000 Merck
52 Mercury (II) Sulfat 50 gr 2,692,000 Merck
53 Reagen Sisa Chlor 1 box 1,932,000 Hanna
54 Silver Nitrat 25 gr 2,398,000 Merck
55 SPANDS 500 ml 1,083,000 Hach
56 LB 500 gr 1,352,000 Merck
57 BGLB 500 gr 2,750,000 Merck
58 Exstran 2,5 L 1,364,000
59 EDTA/Na-EDTA 100 gr 1,499,000
60 Indikator EBT 25 gr 1,984,000
61 500 gr 1,450,000 Merck
62 500 gr 267,000 pudak
63 AgSO4 2,5 gr 3,874,000
64 HgSO4 50 gr 2,690,000
b.
1 Handscoon 1 box 82,000 Sensi gloves
2 Masker kait 1 box 50,000
3 Masker tali 1 box 50,000
4 pH Stick (pH 1-14) 1 box 342,000 Merck
5 Aquadest 20 L 140,000
6 Aquabidest 1 L 100,000
7 Alkohol 70 % 1 L 60,000
8 Alkohol 100 % 100 ml 67,000
9 Spirtus 1 L 35,000
10 Tali kasur 1 box 30,000
11 Tissu 1 gulung 12,000
12 Gas Elpiji isi ulang 12 Kg 1 tabung 192,000
13 Isi ulang pemadam kebakaran 1 kg 100,000 Halonfree
14 Isi ulang pemadam kebakaran 2 kg 190,000 Halonfree
15 1 pack 322,000 diameter 12,5cm
16 1 pack 805,000 diameter 12,5cm
17 1 pack 820,000 diameter 12,5cm
18 1 pack 885,000 diameter 12,5cm
19 Batu Didih 100 gr 1,050,000 Merck
20 Cat gram 100 ml 487,000
21 Larutan KOH 10% 100 ml 515,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
Whatman Kertas Saring No.40
Whatman Kertas Saring No.41
Whatman Kertas Saring No.42
Iron II Sulfate Heptahydrate
Iron II Sulfate Heptahydrate
BAHAN HABIS PAKAI :
Whatman Kertas Saring No.1
54
1 3 4 5
22 Ziehl Nelsen 1 paket 371,000
23 Eter 100 ml 199,000
24 Oil Imersi 500 ml 2,260,000
25 Oil Imersi 100 ml 750,000
26 Eosin 100 ml 696,000
27 Giemsa 0,5 L 2,249,500
28 Giemsa 100 ml 700,000
29 Methanol 70% 100 ml 43,000
30 Reagen Salmonella Thypus 1 paket 540,000 reiged
31 Reagen Golongan Darah 1 paket 826,000
32 Spuit 1 ml 1 box 175,000
33 Spuit 3 ml 1 box 175,000
34 Spuit 5 ml 1 box 175,000
35 Tabung Vacutainer EDTA 1 box 335,000
36 Stick Gula Darah 1 paket 136,000
37 Stick Uric Acid 1 paket 148,000
38 Stick Cholesterol 1 paket 254,000
39 1 Paket 2,250,000
40 1 Paket 1,980,000
41 1 Paket 900,000
42 Rapid test pemeriksaan narkoba 1 Paket 6,530,000
43 Alumunium Foil 1 box 35,000
44 Baterai 9 volt 1 buah 17,000
45 Kapas gulung 1 kg 92,000
46 Karet 1/2 kg 46,000
47 Kertas saring 1 bendel 542,000
48 Kertas payung 1 lembar 3,250
49 Parafilm 1 box 795,000
c.
1 Botol Winklier/Botol BOD Buah 251,000 pyrex 50x30
2 Cawan Petri Buah 34,300 pyrex 100x20
3 Ose Jarum Kaca Buah 16,000 rrc
4 Ose Jarum Stainless Buah 60,000 usbeck germany
5 Ose Bulat Stainless Buah 60,000 usbeck germany
6 Ose Bulat Kaca Buah 17,500 rrc
7 Bunsen Kaca Buah 58,000 250 ml
8 Penjepit Tabung Kayu Buah 11,000
9 Buah 5,400,000 pyrex. Diameter 30 cm
10 Buah 745,000 iwaki, 250 ml
11 Set 707,000 +masenes+ ring
12 Botol Reagen screw cap 100 ml Buah 145,000 pyrex
13 Botol Reagen screw cap 250 ml Buah 155,000 pyrex
14 Botol Reagen screw cap 500 ml Buah 198,000 pyrex
15 Buret Kaca coklat Buah 2,838,000 pyrex 1 ml
16 Tabung Durham Pack 360,000 isi 100 pcs
17 Sendok Penyu Buah 19,300
18 Buah 105,000
19 Batang Pengaduk 30 cm Buah 19,200 rrc
20 Pinset Anatomi 14 cm Buah 23,400
21 Buah 50,500 pyrex
22 Buah 72,800 pyrex
23 Buah 76,000 pyrex
24 Botol gelap 100 ml Buah 29,000
25 Botol gelap 250 ml Buah 34,800
26 Botol gelap 500 ml Buah 53,000
27 Pipet gondok iwaki 1 ml Buah 77,200
28 Pipet gondok iwaki 2 ml Buah 77,200
29 Pipet gondok iwaki 10 ml Buah 107,000
30 Pipet gondok iwaki 20 ml Buah 152,200
31 Pipet ukur iwaki 1 ml Buah 65,000
32 Pipet ukur iwaki 2 ml Buah 71,700
33 Pipet ukur iwaki 5 ml Buah 77,200
Rapid test pemeriksaan pewarna pada
makanan & minuman
Rapid test pemeriksaan pengawet pada
makanan & minuman
Rapid test pemeriksaan pemanis pada
makanan & minuman
Magnetic stirring / stirrer bar 3 cm
Magnetic stirring / stirrer bar 4 cm
ALAT - ALAT LABORATORIUM
Desikator with porselin plate
Tabung ekstraksi/corong pemisah
Cagak Tabung ekstraksi statis
Krustang
Magnetic stirring / stirrer bar 2 cm
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
55
1 3 4 5
34 Gelas ukur iwaki 5 ml Buah 108,000
35 Gelas ukur iwaki 10 ml Buah 108,000
36 Gelas ukur iwaki 25 ml Buah 113,000
37 Labu ukur iwaki 5 ml Buah 177,000
38 Labu ukur iwaki 10 ml Buah 177,000
39 Buah 761,000 1 L
40 Corong buchner dia. 10 cm Buah 145,600
41 Corong buchner dia. 15 cm Buah 315,000
42 Corong buchner dia. 20 cm Buah 642,000
43 Botol timbang 25 x 40 mm Buah 35,000 rrc
44 Botol timbang 30 x 25 mm Buah 203,000 pyrex
45 Botol timbang 40 x 50 mm Buah 257,000 pyrex
46 Tabung centrifuge kaca 10 ml Buah 76,000
47 Rak Pipet ukur Buah 1,250,000
48 Labu ukur kaca 10 ml Buah 177,000 iwaki
49 High Volume Sampler unit 31,380,000
50 Barometer unit 460,000
51 Thermohigrometer unit 637,300
52 Incubator unit 38,560,000 memmert in30
53 Anemometer unit 7,016,000 lutron
54 Pompa Vacuum Filtrasi unit 20,246,000 rocker
55 Water bath unit 23,030,000 memmert 22 ring
56 Desikator unit 1,724,600 pyrex dia 200/210
57 Rol kabel 1.5 MM x 25 M unit 771,000
58 Ice Box 8 liter Buah 273,000
59 Ice Box 6 liter Buah 240,000
60 Erlemeyer 125 ml Buah 103,000 Pyrex
61 Erlemeyer 250 ml Buah 92,000 iwaki
62 Erlemeyer 1000 ml Buah 186,000 iwaki
63 Pipet Ukur 5 ml Buah 64,300 iwaki
64 Pipet Ukur 10 ml Buah 81,500 iwaki
65 Gelas Beaker 300 ml Buah 66,500 iwaki
66 Gelas Beaker 500 ml Buah 79,600 iwaki
67 Gelas Ukur 25 ml Buah 112,500 iwaki
68 Gelas Ukur 50 ml Buah 112,500 iwaki
69 Kompor Gas 2 tungku Buah 793,000 quantum
70 Kompor Listrik 1 tungku Buah 718,000 oxone
71 Rak Stainless isi 24 tabung Buah 152,000 iwaki
72 Buah 246,000 duran 2000 ml
73 Botol tutup asah Buah 166,000 duran dengan tutup
N. ALAT DAN PERLENGKAPAN PERHUBUNGANHarga termasuk pajak
1 3 4 5
1 TRAFFIC LIGHT :
-Traffic Light Simpang Empat modul ф 20
cmpaket 632,000,000 Tenaga Surya+2 CD Matrix
-Traffic Light Simpang Empat modul ф 20
cmpaket 567,750,000 Tenaga Surya
-Traffic Light Simpang Empat modul ф 20
cmpaket 642,735,000 Tenaga Surya +2 Count Down
-Traffic Light Simpang Empat modul ф 20
cmpaket 728,400,000 Tenaga Surya + 2 CD VMS
- Traffic Light Simpang Tiga modul ф 20 cm paket 599,800,000 Tenaga Surya Matrix
- Traffic Light Simpang Tiga modul ф 20 cm paket 567,700,000 Tenaga Surya
- Traffic Light Simpang Tiga modul ф 20 cm paket 636,600,000 Tenaga Surya Count Down
- Traffic Light Simpang Tiga modul ф 20 cm paket 674,870,000 Tenaga Surya VMS
- Traffic Light Simpang Empat paket 396,353,000 Listrik
- Traffic Light Simpang Tiga paket 364,200,000 Listrik
- Traffic Light Simpang Empat LED 20 cm paket 546,300,000 Tenaga Surya
- Traffic Light Simpang Empat LED 20 cm paket 610,500,000 Tenaga Surya +2 Count Down
SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NO
Erlenmeyer berlengan/Filtering
flaskduran
Botol sampel air mikrobiologis dengan
pemberat
NO NAMA BARANG
SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NAMA BARANG
56
1 3 4 5
- Traffic Light Simpang Empat LED 20 cm paket 642,735,000 Tenaga Surya+2 CD Matrix
- Traffic Light Simpang Empat LED 20 cm paket 696,296,000 Tenaga Surya + 2 CD VMS
- Traffic Light Simpang Tiga LED cm paket 524,900,000 Tenaga Surya
- Traffic Light Simpang Tiga LED cm paket 610,598,000 Tenaga Surya +2 Count Down
- Traffic Light Simpang Tiga LED cm paket 632,000,000 Tenaga Surya+2 CD Matrix
- Traffic Light Simpang Tiga LED cm paket 696,290,000 Tenaga Surya + 2 CD VMS
- Traffic Light Portable unit 128,547,000 untuk persimpangan
2 KOMPONEN TRAFFIC LIGHT :
a. Bok Lampu :
- Bok Lampu LED 1 Aspek 20 cm set 1,925,000
- Bok Lampu LED 2 Aspek 20 cm set 2,640,000
- Bok Lampu LED 3 Aspek 20 cm set 3,597,000
- Bok Lampu LED 1 Aspek 30 cm set 2,156,000
- Bok Lampu LED 2 Aspek 30 cm set 3,025,000
- Bok Lampu LED 3 Aspek 30 cm set 4,235,000
b. Controller :
- Controller Microprossesor unit 22,539,000 4 signal group
- Controller Microprossesor unit 43,593,000 8 signal group
- Controller Microprossesor unit 60,555,000 8 signal group, full responsif
kamera
- Controller Mini Micro unit 19,844,000
- Controller Mini Eprom unit 17,393,000 4 signal group
- Controller Flasher unit 10,829,500
- Controller Bantu (tenaga surya) unit 12,033,000
c. Flasher :
- Controller, Lampu 1 Asp x 2 set set 18,876,000 Tenaga Surya, 20 cm
- Controller, Lampu 2 Asp x 1 set set 16,785,000 Tenaga Surya, 20 cm
- Controller, Lampu 2 Asp x 2 set set 22,741,000 Tenaga Surya, 20 cm
- Controller, Lampu 1 Asp x 2 set set 19,250,000 Tenaga Surya, 30 cm
- Controller, Lampu 2 Asp x 1 set set 18,419,500 Tenaga Surya, 30 cm
- Controller, Lampu 2 Asp x 2 set set 20,000,000 Tenaga Surya, 30 cm
- Flasher LED 1 Aspek 20 cm set 4,023,000
- Flasher LED 2 Aspek 20 cm set 5,955,950
- Flasher LED 1 Aspek 30 cm set 4,210,000
- Flasher LED 2 Aspek 30 cm set 7,590,000
d. Housing :
- Housing Lampu 1 Aspek 20 cm set 1,296,000
- Housing Lampu 2 Aspek 20 cm set 1,885,000
- Housing Lampu 3 Aspek 20 cm set 2,636,000
- Housing Lampu 1 Aspek 30 cm set 1,936,000
- Housing Lampu 2 Aspek 30 cm set 2,533,000
- Housing Lampu 3 Aspek 30 cm set 4,252,000
e. Modul :
- Modul LED Merah 20 cm buah 2,572,000
- Modul LED Kuning 20 cm buah 2,572,000
- Modul LED Hijau 20 cm buah 3,711,000
- Modul LED Merah 30 cm buah 3,902,000
- Modul LED Kuning 30 cm buah 3,902,000
- Modul LED Hijau 30 cm buah 5,067,000
- Modul Running Text per 16 cm x 32
cmbuah 1,430,000
f. Tiang :
- Tiang Lengkung batang 6,270,000 Galvanis
- Tiang Lengkung Solar Cell batang 5,940,000
- Tiang Lengkung Solar Cell batang 7,260,000 Oktagonal
- Tiang Lurus batang 4,950,000 Galvanis
- Tiang Lurus Solar Cell batang 4,400,000
- Tiang Lurus Solar Cell batang 6,050,000 Oktagonal
- Tiang Penyangga Solar Cell batang 1,870,000 Galvanis
g. Counterdown :
- Model digit unit 23,100,000
- Model matrik unit 37,400,000
- Model VMS uk display 108 x 30 m unit 62,700,000
h. Warning Light Tenaga Surya :
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
57
1 3 4 5
- Controller, Lampu 1 Aspek x 2 set
LED 20 cmunit 38,500,000
- Controller, Lampu 2 Aspek x 1 set
LED 20 cmunit 38,500,000
- Controller, Lampu 2 Aspek x 2 set
LED 20 cmunit 55,000,000
- Controller, Lampu 1 Aspek x 2 set
LED 30 cmunit 45,100,000
- Controller, Lampu 2 Aspek x 1 set
LED 30 cmunit 51,700,000
- Controller, Lampu 2 Aspek x 2 set
LED 30 cmunit 62,700,000
- Warning Light 1 Aspek + 2 Aspek unit 66,000,000
i. Warning Light PLN :
- Controller, Lampu 1 Aspek x 2 set
LED 20 cmunit 29,700,000 Tanpa sambungan PLN
- Controller, Lampu 2 Aspek x 1 set
LED 20 cmunit 29,700,000 Tanpa sambungan PLN
- Controller, Lampu 2 Aspek x 2 set
LED 20 cmunit 37,400,000 Tanpa sambungan PLN
- Controller, Lampu 1 Aspek x 2 set
LED 30 cmunit 30,800,000 Tanpa sambungan PLN
- Controller, Lampu 2 Aspek x 1 set
LED 30 cmunit 30,800,000 Tanpa sambungan PLN
- Controller, Lampu 2 Aspek x 2 set
LED 30 cmunit 38,500,000 Tanpa sambungan PLN
3 TRAFFIC CONE :
- Traffic Cone Karet 60 cm buah 258,500 Import
- Traffic Cone Karet 70 cm buah 316,800 Silicon Ruber
4 WARNING LIGHT TENAGA SURYA :
-Warning Light 2 aspek x 20 cm tiang
lengkungset 46,200,000
-Warning Light 2 aspek x 30 cm tiang
lengkungset 49,500,000
5 PATOK PENGAMAN :
- Patok pengaman plastik (reflective) buah 412,500
- Patok pengaman besi buah 412,500
- Patok Pengaman tenaga surya unit 20,350,000
- Patok Pengaman batang 1,100,000
6 MARKA :
- Aplikator Marka jalan unit 44,000,000 Penghampar
- Preheater unit 44,000,000 Pemasak/pemanas
- Glassbead kg 38,500
- Thermoplastic kg 41,800 ASHTO
- Thermoplastic kg 41,800 non ASHTO
- paku marka reflector 10 x 10 cm buah 320,650
- paku Marka Solarcell 10 x 10 cm buah 434,500 Import
-Paku marka tempered glass uk 100x40
mmbuah 93,500 ф 10 cm
- Pengecatan Marka Jalan m2 275,000 Thermo 2,2 mm
- Pengecatan Marka Jalan m2 275,000 Coolplastik
- Pembuatan Pita penggaduh m 880,000 15 mm x 120 mm
- Pembuatan Pita penggaduh m2 1,650,000 15 mm x 120 mm
7 RAMBU :
a. Daun RPPJ :
- Daun RPPJ uk. 120 cm x 120 cm
tebal 2 mmbuah 2,640,000 daun saja tanpa tiang
- Daun RPPJ uk. 120 cm x 180 cm
tebal 2 mmbuah 3,850,000 daun saja tanpa tiang
- Daun RPPJ uk. 120 cm x 240 cm
tebal 2 mmbuah 4,950,000 daun saja tanpa tiang
- Daun RPPJ uk. 120 cm x 300 cm
tebal 2 mmbuah 11,000,000 daun saja tanpa tiang
- Daun RPPJ uk. 120 cm x 120 cm lembar 2,200,000
- Daun RPPJ uk. 120 cm x 180 cm lembar 3,300,000
- Daun RPPJ uk. 120 cm x 240 cm lembar 4,400,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
58
1 3 4 5
- Daun RPPJ uk. 120 cm x 300 cm lembar 8,800,000
- Daun RPPJ uk. 120 cm x 300 cm lembar 11,000,000
b. RPPJ :
- RPPJ uk. 120 cm x 120 cm tebal 2
mmunit 8,800,000 daun, tiang dan pasang
- RPPJ uk. 120 cm x 180 cm tebal 2
mmunit 12,100,000 daun, tiang dan pasang
- RPPJ uk. 120 cm x 240 cm tebal 2
mmunit 14,300,000 daun, tiang dan pasang
- RPPJ uk. 120 cm x 300 cm tebal 2
mmunit 18,700,000 daun, tiang dan pasang
- RPPJ uk. 120 cm x 120 cm terpasang 8,800,000
- RPPJ uk. 120 cm x 180 cm terpasang 11,550,000
- RPPJ uk. 120 cm x 240 cm terpasang 13,750,000
- RPPJ uk. 120 cm x 300 cm terpasang 22,000,000
- RPPJ uk. 200 cm x 300 cm terpasang 22,000,000
c. Rambu Lalu-Lintas :
- Daun Rambu Reflectif EG unit 1,540,000 100 x 100 cm
- Daun Rambu Reflectif Type IV unit 1,870,000 100 x 100 cm
550,000 daun saja tanpa tiang
935,000 daun dengan tiang
1,210,000 daun, tiang dan pasang
buah 9,350,000 daun dengan tiang
unit 1,540,000 daun dengan tiang
- Rambu lalu lintas lembar 693,000 60 x 60 cm
- Rambu Lalu Lintas dengan Tiang unit 1,100,000 tiang 1,5", 3 m
- Rambu Lalu Lintas dengan Tiang terpasang 1,540,000 tiang 1,5", 3 m
- Rambu lalu lintas lembar 1,067,000 75 x 75 cm
- Rambu Lalu Lintas dengan Tiang unit 1,540,000 tiang 2", 4 m
- Rambu Lalu Lintas dengan Tiang terpasang 1,870,000 tiang 2", 4 m
- Papan nama jalan dengan tiang
ukuran 80x20 cmlembar 583,000
- Papan nama jalan dengan tiang lembar 935,000
- Tiang Rambu standar (konstruksi F)
terpasangunit 2,310,000 2 daun rambu ( 75 x 75 cm )
- Daun Rambu lalu lintas dengan tiang
ф 2" tebal 2 mm ukuran 75 x 75 cmunit 2,420,000 daun, tiang dan pasang
- Rambu LL Portable ukuran 60 x 60
cm tinggi 160unit 770,000
- Rambu LL Portable ukuran 75 x 75
cm tinggi 160unit 1,045,000
- Rambu LL ukuran 60 cm lembar 583,000
- Rambu Elektronik 120 x 120 cm terpasang 42,850,000
8 CERMIN TIKUNGAN :
-Polycarbonat ukuran ф 60 cm dengan
tiangunit 3,300,000 terpasang
-Polycarbonat ukuran ф 80 cm dengan
tiangunit 3,850,000 terpasang
-Polycarbonat ukuran ф 100 cm dengan
tiangunit 4,950,000 terpasang
9 SCOTCHLITE UK 100 cm x 60 cm terpasang 190,000
10 LAIN-LAIN :
- Tempered Glass ukuran 100 x 40 mm buah 363,000
- Guard raill (panjang efektif 4 m ) m 1,170,950 ketebalan post 4,5 - 6 mm
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
- Daun Rambu lalu lintas dengan tiang
ф 2" tebal 2 mm ukuran 60 x 60 cmunit/set
- Daun Rambu lalu lintas dengan tiang
ф 2" tebal 2 mm ukuran 60 x 60 cmunit
- Daun rambu lalu lintas (alumunium)
tebal 2 mm ukuran 75 x 75 cm
- Daun Rambu lalu lintas dengan tiang
ф 2" tebal 2 mm ukuran 75 x 75 cm
- Daun rambu lalu lintas (alumunium)
tebal 2 mm ukuran 60 x 60 cm
buah
2
59
1 3 4 5
- Guard raill m' 1,170,950 pengadaan
- Guard raill m' 1,940,400 terpasang
- terminal End terpasang 2,090,000 ketebalan beam min 2,67 mm
ketebalan blocking 4,5 - 6 mm
-Battery APILL Tenaga Surya (URLA) 12
V 50Mbuah 2,805,000
-Solar cell type polycrystaline 36 cell 50
WPbuah 1,393,700
- Watter barrier buah 3,008,500
-Road barrier (plastik/HDPE, vol 500
liter)buah 2,255,000
P 1200 mm L 480 mm T 800
mm
- Lampu lalu lintas (stik lamp) buah 121,000
- Tiang LPJU oktagonal 5 m' buah 3,900,000 Belum termasuk pasang
- Tiang LPJU oktagonal 7 m' buah 4,325,000 Belum termasuk pasang
- Tiang LPJU oktagonal 9 m' buah 5,500,000 Belum termasuk pasang
-LPJU Tenaga Surya Lengan Tunggal 80
wattterpasang 47,300,000
-LPJU Tenaga Surya Lengan Tunggal 60
wattterpasang 30,800,000
-LPJU Tenaga Surya Lengan Tunggal 40
wattterpasang 24,200,000
-LPJU Tenaga Surya Lengan Tunggal 20
wattterpasang 20,900,000
-LPJU Tenaga Surya Lengan Ganda 80
wattterpasang 82,500,000
-LPJU Tenaga Surya Lengan Ganda 60
wattterpasang 56,100,000
-LPJU Tenaga Surya Lengan Ganda 40
wattterpasang 35,200,000
-LPJU Tenaga Surya Lengan Ganda 20
wattterpasang 30,800,000
- Lampu jalan 40 watt dengan tiang 9 m' buah 38,500,000 LED tenaga surya
- Deliniator Plastik batang 287,100
- Deliniator Plastik 1,2 m pipih pengadaan 408,100 Polyethelene (PE)
- Deliniator LED Solar Cell 1,2 m pipih pengadaan 16,500,000
-Deliniator Besi 1,2 m scotlite HI merah
putihpengadaan 1,100,000 Pipa besi ф 4"
- Deliniator Besi batang 132,000 Pipa besi ф 4"
- Kabel Nyy 4 x 2,5 mm m' 75,900
- Kabel Nyy 3 x 6 mm m' 46,200
- Timer buah 1,475,100
- Lensa Polycarbonat 20 cm buah 341,000
- Lensa Polycarbonat 30 cm buah 341,000
- RF Modem (Tenaga Surya) unit 8,800,000
- Battery deep cycle unit 3,298,900 50 AH per 12 volt
O. PAKAIAN DINAS
Harga Termasuk Pajak
1 3 4 5
1. BUPATI / WAKIL BUPATI :
- Pakaian Sipil Harian (PSH) stel 5,850,000
- Pakaian Sipil Resmi (PSR) stel 6,950,000
- Pakaian Sipil Lengkap (PSL) stel 6,950,000
- Pakaian Dinas Harian (PDH) stel 5,500,000
- Pakaian Adat Jawa stel 5,350,000 satu pengadeg lengkap
2. SEKRETARIS DAERAH
- Pakaian Sipil Harian (PSH) stel 480,000
- Pakaian Sipil Resmi (PSR) stel 5,500,000
- Pakaian Sipil Lengkap (PSL) stel 5,800,000
- Pakaian Dinas Harian (PDH) stel 4,250,000
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
NO NAMA BARANG SATUAN HARGA KETERANGAN
(MERK/BAHAN)
2
sudah termasuk ongkos jahit.
sudah termasuk ongkos jahit.
60
P. ALAT METROLOGI
Harga Termasuk Pajak
1 3 4 5
1 Kawat Segel buah 120,000
2 Timah Segel buah 100,000
3 Timah Justir buah 1,100,000
4 Lemping Pembubuh Tera buah 1,500
5 Akuades Liter 20,000 air murni
6 Meja Tahan Getar buah 55,000,000
7 Termohygrometer buah 2,000,000 Type HTC-1, daya baca 0.1 C
8 Batu Bidur 20 kg buah 820,000
Q. ALAT PERLENGKAPAN LAINNYA
Harga Termasuk Pajak
1 3 4 5
1 Patok Beton batas tanah : 10/10, 50 cm
- Daerah Sedang buah 40,000
- Daerah Sulit buah 50,000
2 Tabung gas LPG 12 kg Isi full buah 550,000
Isi Ulang tabung gas LPG 12 kg buah 184,000
3 Tabung Oksigen :
- Tabung oksigen 2 m3 buah 1,500,000
- Tabung oksigen 4 m3 buah 200,000
- Tabung oksigen 6 m3 buah 2,700,000
4 Isi ulang gas Oksigen Kg 158,000
5 APAR :
a. ABC Dry Chemical Powder Portable :
- Kapasitas 1 Kg Kg 850,000
- Kapasitas 2 Kg Kg 920,000
- Kapasitas 3 Kg Kg 1,200,000
- Kapasitas 4 Kg Kg 1,350,000
- Kapasitas 5 Kg Kg 1,430,000
- Kapasitas 6 Kg Kg 1,567,000
- Kapasitas 9 Kg Kg 2,350,000
- Kapasitas 12 Kg Kg 2,850,000
b. ABC Dry Chemical Powder Trolley :
- Kapasitas 20 Kg Kg 10,300,000
- Kapasitas 25 Kg Kg 12,648,000
- Kapasitas 35 Kg Kg 16,625,000
- Kapasitas 50 Kg Kg 21,129,000
- Kapasitas 75 Kg Kg 25,519,000
c. BC Carbon Dtoxda (CO2) Stored Portable :
- Kapasitas 2,3 Kg Kg 2,650,000
- Kapasitas 3,2 Kg Kg 3,400,000
- Kapasitas 4,6 Kg Kg 4,700,000
- Kapasitas 6,8 Kg Kg 7,000,000
6 Isi Ulang APAR :
- Dry Chemical Powder (bubuk) Kg 65,000
- Carbon dioxide (CO2) Kg 65,000
- Foam Liquid (busa) Kg 65,000
- Foam AB (busa) Kg 65,000
- Liquid Gas AF11 Starvvo (gas cair) Kg 800,000
- Liquid Gas NAV PIV Servvo (gas cair) Kg 1,171,000
- Liquid Gas Solkaflam Alpindo (gas cair) Kg 1,171,000
7 Cangkul Buah 40,000
8 Tripoit kereta sorong/ Angkong Buah 616,000 Artco
9 Papan Nama Buah 385,000
10 Meteran Buah 60,000 50 meter
11 Cat pilox Buah 32,000
12 Patok Buah 12,000
13 Sekop Buah 55,000
14 Senggrong Buah 24,000
15 Palu Besar Buah 170,000 5 kg
KETERANGAN
(MERK/BAHAN)
2
lengkap dengan peralatan
pendukung
HARGA
2
NO NAMA BARANG SATUAN HARGA
NO NAMA BARANG SATUANKETERANGAN
(MERK/BAHAN)
61
1 3 4 5
16 Palu Kecil Buah 30,000
17 Dandang Buah 100,000
18 Alat takar/Ember besar Buah 28,000
19 Catut Buah 20,000
20 Linggis Besar Buah 50,000
21 Gergaji besi Buah 25,000
22 Benang Buah 2,500
23 Raskam Buah 15,000
24 Gergaji Buah 55,000
25 Selang Buah 22,000
26 Cetok Buah 24,000
27 Ember cor Buah 10,000
28 Linggis Kecil Buah 45,000
29 Sabit Buah 50,000
30 Parang Buah 70,000
31 Gunting Seng Buah 104,000 10 inchi/Holo
NO NAMA BARANG SATUAN HARGAKETERANGAN
(MERK/BAHAN)
2
62
A. KOMPENSASI
1. Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan
NO
1
A
1 Pengarah :
Eselon II 375,000
2 Pelaksana :
Eselon III 335,000
Eselon IV 355,000
Golongan IV 245,000
Golongan III 225,000
Golongan II 215,000
JFT 225,000
B
Eselon III 250,000
Eselon IV 220,000
Golongan IV 215,000
Golongan III 200,000
Golongan I dan II 190,000
JFT 215,000
Keterangan :
a.
b.
c.
d.
e.
f.
g.
h.
i.
2. Kelebihan Jam Kerja / Lembur
a.
b.
c.
d.
e.
1) Pada hari kerja biasa sesudah jam tutup kantor :
a) Golongan I : Rp. 13,500 / jam
b) Golongan II : Rp. 17,000 / jam
c) Golongan III : Rp. 20,000 / jam
d) Golongan IV : Rp. 20,000 / jam
2)
f.
g.
h.
1) harus ada Surat Perintah Kerja (SPK) yang diterbitkan setiap kali pelaksanaan;
2) harus ada daftar hadir;
3) harus ada laporan hasil lembur.
BAB II. JASA
Syarat sebagaimana dimaksud pada angka 1), angka 2), dan angka 3) harus dilampirkan pada saat penyampaian
Surat Pertanggungjawaban (SPJ).
Kerja lembur yang dilaksanakan pada hari libur Idul Fitri, Natal dan Tahun Baru, uang lembur dapat dibayarkan
paling banyak 8 (delapan) jam kerja.
Besarnya uang lembur untuk tiap-tiap jam penuh kerja lembur bagi Pegawai Negeri Sipil Daerah adalah sebagai
berikut :
Untuk kerja lembur yang mencapai paling kurang 2 (dua) jam dapat diberikan uang makan sebesar Rp.
25.000,00 dan diberikan paling banyak 1 (satu) kali.
Untuk kelebihan jam kerja/kerja lembur harus mengikuti ketentuan sebagai berikut :
Pegawai Negeri Sipil Daerah/Tenaga Kontrak yang melakukan kerja lembur selama paling sedikit 1 (satu) jam
penuh diberikan uang lembur
Uang lembur yang dapat dibayarkan paling banyak 3 (tiga) jam per hari.
Kerja lembur yang dilaksanakan pada hari libur kerja, uang lembur dapat dibayarkan paling banyak 4 (empat) jam
kerja.
maksimal 7 (Tujuh) orang,
untuk Tim yang dibentuk
Sekretaris Daerah.
Kompensasi Kerja diberikan kepada mereka yang bertanggungjawab atas kegiatan dalam Tim yang dibentuk dengan
Surat Keputusan Pejabat yang berwenang.
Pembentukan Tim yang bersifat koordinatif dengan mengikutsertakan Instansi di Luar Pemerintah Daerah,
ditandatangani oleh Kepala Daerah.
Pembentukan Tim yang bersifat koordinatif dengan mengikutsertakan antar Satuan Kerja Perangkat Daerah (SKPD),
ditandatangani oleh Sekretaris Daerah.
Jangka waktu Pemberian Kompensasi Tim Pelaksana Kegiatan lebih pendek daripada Sekretariat Tim Pelaksana.
Setiap Pejabat Pelaksana Teknis Kegiatan (PPTK), hanya diperkenankan menganggarkan honorarium Tim maksimal
untuk 1 (satu) kegiatan.
Jika 1 (satu) orang merangkap jabatan dalam 1 (satu) rekening belanja, honorarium tersebut hanya bisa diberikan
untuk satu honor jabatan.
Non PNS yang diberi tugas untuk melaksanakan kegiatan berdasarkan keputusan pejabat yang berwenang, dapat
diberikan kompensasi kerja paling banyak disetarakan dengan Tim pelaksana dan Sekretariat Tim Pelaksana
golongan II (SLTA/D3) dan golongan III (S1).
Non PNS sebagaimana dimaksud huruf h, adalah Non PNS selain Tenaga Kontrak atau tenaga yang memiliki ikatan
kerja dengan Pemerintah Kabupaten Kulon Progo. Misalnya, Unsur lembaga organisasi kemasyarakatan, Aparat
Desa, Dukuh, Tenaga Pendata, atau masyarakat yang ikut terlibat dalam pelaksanaan kegiatan.
Besaran uang lembur untuk tiap-tiap jam penuh kerja lembur bagi Tenaga Kontrak disetarakan dengan Golongan II.
Pemberian uang lembur pada hari libur sebesar 200 % (dua ratus per seratus) dari besarnya uang lembur.
Struktur Tim Pelaksana Kegiatan disesuaikan kebutuhan SKPD (dapat dibentuk Penanggungjawab, Ketua, Wakil
Ketua, Sekretaris, dan Anggota), dengan besaran honorarium berdasarkan pangkat/golongan personil Tim.
2
NAMA JABATAN JUMLAH PERSONIL TUNJANGAN / BULAN
3 4
TIM PELAKSANA KEGIATAN :
maksimal 3 (tiga) orang
maksimal 4 (empat) orang
maksimal 6 (enam) orang.
maksimal 10 (Sepuluh)
orang, untuk Tim yang
dibentuk Kepala Daerah.
SEKRETARIAT TIM PELAKSANA :
63
3. Honorarium Kelompok Kerja (POKJA) Pemilihan
1 3 4 5 5 6 7
I 600,000 700,000 800,000 900,000
II 700,000 800,000 900,000 1,100,000
III 480,000 600,000 720,000 900,000 1,090,000
1 8 9 10 11 12
I 1,000,000 1,100,000 1,500,000 1,750,000 2,250,000
II 1,400,000 1,600,000 2,000,000 2,500,000 3,000,000
III 1,270,000 1,510,000 1,750,000 1,990,000 2,560,000
4. Honorarium Panitia Pemeriksa Hasil Pekerjaan
1 3 4 5 5 6 7
I
- 350,000 450,000 500,000 550,000 600,000
- 300,000 400,000 450,000 500,000 550,000
- 250,000 350,000 400,000 450,000 500,000
II
- 450,000 550,000 600,000 650,000 700,000
- 400,000 500,000 550,000 600,000 650,000
- 350,000 450,000 500,000 550,000 600,000
III
- 250,000 350,000 450,000 500,000 500,000 550,000
- 200,000 300,000 400,000 400,000 450,000 500,000
- 150,000 250,000 350,000 350,000 400,000 450,000
1 8 9 10
I
- 650,000 700,000 800,000
- 600,000 650,000 750,000
- 550,000 600,000 700,000
II
- 800,000 700,000 800,000
- 750,000 650,000 750,000
- 700,000 600,000 700,000
III
- 650,000 700,000 800,000
- 600,000 650,000 750,000
- 550,000 600,000 700,000
5.
1
1 600,000 850,000 750,000
2 650,000 900,000 800,000
3 700,000 1,050,000 850,000
4 750,000 1,100,000 900,000
> 200 jt s/d 500 jt
> 500 jt s/d 1 M
2 3 4 5
s/d 50 jt
s/d 200 jt
Sekretaris
Anggota
Honorarium Pejabat Pembuat Komitmen
NO
JUMLAH DANA
DALAM PAGU
ANGGARAN (Rp)
BESARAN HONOR PER BULAN (Rp.)
PENGADAAN BARANG/JASA LAINNYAPEKERJAAN
KONSTRUKSI
PEKERJAAN JASA
KONSULTANSI
Panitia Pemeriksa Hasil
Pekerjaan Konstruksi :Ketua
Sekretaris
Anggota
Panitia Pemeriksa Hasil
Pekerjaan Jasa Konsultansi :Ketua
2
Panitia Pemeriksa Hasil
Pekerjaan Barang/Jasa Lainnya:Ketua
Sekretaris
Anggota
BESARAN HONOR PER PAKET (Rp.)
> 25 M s/d
50 M
> 50 M s/d
100 M
> 100 M
Anggota
Panitia Pemeriksa Hasil
Pekerjaan Jasa Konsultansi :Ketua
Sekretaris
Anggota
NO JABATAN DALAM KEGIATAN
Ketua
Sekretaris
Anggota
Panitia Pemeriksa Hasil
Pekerjaan Konstruksi :Ketua
Sekretaris
> 1 M s/d
2,5 M
> 2,5 M s/d
5 M
> 5 M s/d
10 M
> 10 M s/d
25 M2
Panitia Pemeriksa Hasil
Pekerjaan Barang/Jasa Lainnya:
NO JABATAN DALAM KEGIATAN
BESARAN HONOR PER PAKET (Rp.)
> 100 jt s/d
200 jt
> 200 jt s/d
1 M
Pengadaan Jasa Konsultansi
NO JABATAN DALAM KEGIATAN
NO JABATAN DALAM KEGIATAN
BESARAN HONOR PER PAKET (Rp.)
s/d 100 jt> 100 jt s/d
200 jt
> 200 jt s/d
500 jt
> 500 jt s/d
1 M
> 1 M s/d
2,5 M
> 2,5 M s/d
5 M
2
Pengadaan Barang/Jasa Lainnya
Pekerjaan Konstruksi
Pengadaan Jasa Konsultansi
BESARAN HONOR PER PAKET (Rp.)
> 5 M s/d
10 M
> 10 M s/d
25 M
> 25 M s/d
50 M
> 50 M s/d
100 M
> 100 M
2
Pengadaan Barang/Jasa Lainnya
Pekerjaan Konstruksi
64
1
5 800,000 1,200,000 1,000,000
6 850,000 1,300,000 1,100,000
7 900,000 1,400,000 1,150,000
8 950,000 1,500,000 1,200,000
9 1,050,000 1,600,000 1,300,000
10 1,050,000 1,800,000 1,400,000
11 1,050,000 2,000,000 1,600,000
6.
1
I
II 450,000
III
1
I 200,000 275,000 300,000
II 250,000 275,000 300,000
III 250,000 275,000
s/d 200 jt>200 jt s/d
1 M
> 1 M s/d
2,5 M
> 2,5 M s/d
5 M
> 5 M s/d
10 M> 10 M
1 3 4 5 5 6 7
300,000 300,000 400,000 500,000 600,000 750,000
7
1
1
2 250,000 200,000
3 300,000 250,000
4 350,000 300,000
5 400,000 350,000
6 450,000 400,000
7 500,000 450,000
8 550,000 500,000
1
2
3
4
5
> 10 M
Catatan :
Tim Teknis membantu PA/KPA/PPK/Pokja Pemilihan untuk pemeriksaan bersama terhadap hasil pekerjaan.
Tim Pendukung adalah PNS Daerah dan ditetapkan oleh PPK.
Tim Pendukung membantu PA/KPA/PPK/Pokja Pemilihan untuk urusan bersifat adminsitrasi/keuangan.
PPK dalam melaksanakan tahapan pengadaan langsung dapat dibantu oleh Tim Pendukung.
> 200 jt s/d 500
> 500 jt s/d 1 M
> 1 M s/d 2,5 M
> 2,5 M s/d 5
> 5 M s/d 10
2 3 4
s/d 50 jt
s/d 200 jt
2
Pejabat Pengadaan untuk e-
cataloque
Honorarium Tim Teknis dan Tim Pendukung Pembantu PA/KPA/PPK dan Pokja Pemilihan
NOJUMLAH DANA DALAM PAGU
ANGGARAN (Rp) Tim Teknis Tim Pendukung
Pejabat Pemeriksa Hasil
Pekerjaan Konstruksi
Pejabat Pemeriksa Hasil
Pekerjaan Jasa Konsultansi
c. Pejabat Pengadaan e cataloque
NO JABATAN DALAM KEGIATAN
BESARAN HONOR PER PAKET (Rp.)
> 100 jt s/d 200 jt
2 3 4 5
Pejabat Pemeriksa Hasil
Pekerjaan Barang/Jasa Lainnya
Konstruksi
Jasa Konsultansi 400,000 450,000
b. Pejabat Pemeriksa Hasil Pekerjaan
NO JABATAN DALAM KEGIATANBESARAN HONOR PER PAKET (Rp.)
s/d 50 jt > 50 jt s/d 100 jt
> 100 jt s/d 200 jt
2 3 4 5
Barang/Jasa Lainnya 250,000 350,000 400,000
> 25 M sd 50 M
> 50 M sd 100 M
> 100 M
a. Pejabat Pengadaan
NO JABATAN DALAM KEGIATANBESARAN HONOR PER PAKET (Rp.)
s/d 50 jt > 50 jt s/d 100 jt
> 1 M s/d 2,5 M
> 2,5 M s/d 5 M
> 5 M s/d 10 M
> 10 M sd. 25 M
JUMLAH DANA
DALAM PAGU
ANGGARAN (Rp)
BESARAN HONOR PER BULAN (Rp.)
PENGADAAN BARANG/JASA LAINNYAPEKERJAAN
KONSTRUKSI
PEKERJAAN JASA
KONSULTANSI
2 3 4 5
Honorarium Pejabat Pengadaan dan Pejabat Pemeriksa Hasil Pekerjaan (Pengadaan tidak melalui Bagian
Pengadaan Barang/Jasa)
BESARAN HONOR PER BULAN (Rp.)
Tim Teknis adalah PNS Daerah/Kementerian/Lembaga dan ditetapkan oleh Pengguna Anggaran (PA).
NO
65
8 Honorarium Penanggungjawab Pengelola Keuangan
1 3 4 5 6 7 8
1 325,000 375,000 425,000 475,000 525,000 575,000
2
3 275,000 325,000 375,000 425,000 475,000 525,000
4 225,000 275,000 325,000 375,000 425,000 475,000
5
6
150,000 175,000 200,000 225,000 275,000 325,000
200,000 250,000 300,000 350,000 400,000 450,000
9 150,000 200,000 250,000 300,000 350,000 375,000
10 175,000 225,000 275,000 325,000 375,000 425,000
11 Bendahara Pengeluaran 250,000 300,000 350,000 400,000 475,000 525,000
200,000 250,000 300,000 350,000 375,000 475,000
175,000 225,000 275,000 325,000 350,000 400,000
14
15 200,000 250,000 300,000 350,000 375,000 450,000
175,000 225,000 275,000 325,000 350,000 425,000
150,000 200,000 250,000 300,000 325,000 400,000
Keterangan :
1.
2.
3.
4.
5.
6.
7.
8.
9.
9 Honorarium Bulanan Pengelola Barang
<1 M> 1 M s/d 5
M
> 5 M s/d 10
M > 10 M
1 3 4 5 6
1 Pengurus Barang Pengelola 500,000
2 Pengurus Barang Pengguna 225,000 325,000 375,000 450,000
3 Pengurus Barang Pembantu 175,000 225,000 250,000 275,000
4 Pembantu Pengurus Barang Pengelola 300,000
5 Pembantu Pengurus Barang Pengguna 150,000 200,000 225,000 250,000
10 Honorarium Audit
1
1 Pengendali Mutu 260,000
2 Pembantu Penanggungjawab 395,000
3 Pengendali Teknis 450,000
4 Ketua Tim Pemeriksa 750,000
5 Anggota Tim Pemeriksa 560,000
6 125,000
Keterangan : Honorarium tersebut termasuk Biaya Perjalanan Dinas Pemeriksaan.
KPA (non Kepala SKPD) 275.000
2
NO JABATANBESARAN HONOR PER OBYEK
PEMERIKSAAN (Rp.)
2 3
NO JABATAN
NILAI ASET/BARANG YANG DIKELOLA (Rp.)
Staf Administrasi Pemeriksa
16 Bendahara Penerima Pembantu
PPTK Keuangan/Perencanaan
dan Keuangan
> 50 M
2
NO JABATAN
NILAI UANG YANG DIKELOLA
< 1 M> 1 M s/d
2,5 M
> 2,5 M s/d
5 M
> 5 M s/d
10 M
>10 M s/d
50 M
PPKD/PA/ KPA Kepala SKPD
PPTK Perencanaan, Umum dan
Kepegawaian
PPTK Keuangan/Perencanaan dan Keuangan diberikan honorarium berdasarkan jumlah pagu yang dikelola SKPD
dan dapat diberikan selama 12 (dua belas) bulan.
PPTK Perencanaan, Umum dan Kepegawaian dapat diberikan honorarium selama 12 (dua belas) bulan.
PPTK Kegiatan Teknis diberikan honorarium maksimal selama 6 (enam) bulan.
225.000
PPTK Kegiatan Teknis 225.000
7 Petugas verifikasi SPJ
(Pendapatan)
8 Petugas verifikasi SPJ (Belanja)
Penyiap SPM
Petugas Akuntansi dan Pelaporan
Keuangan
12 Bendahara Pengeluaran Pembantu
13 Pembantu Bendahara
Pengeluaran
Bendahara BOS 275.000
17 Pembantu Bendahara Penerima
Penanggungjawab Pengelola Keuangan diberikan honorarium berdasarkan jumlah pagu yang dikelola SKPD dan
diberikan selama 12 (dua belas) bulan, kecuali KPA (Non Kepala SKPD) dan PPTK.
KPA (Non Kepala SKPD) diberikan honorarium maksimal selama 6 (enam) bulan.
SKPD dengan struktur pejabat eselon terendah adalah Eselon IV, maka PPTK dijabat oleh Eselon IV dan KPA (Non
Kepala SKPD) dijabat oleh Eselon III.
SKPD dengan struktur pejabat eselon terendah adalah Eselon III, maka PPTK dijabat oleh Eselon III, dan tidak ada
KPA (Non Kepala SKPD).
PA, KPA, dan PPTK yang mendapatkan honorarium Tim Pelaksana Kegiatan/Sekretariat Tim Pelaksana Kegiatan,
dapat diberikan honorarium sebagai Penanggung Jawab Pengelola Keuangan.
Jika 1 (satu) orang merangkap jabatan sebagai Penanggung Jawab Pengelola Keuangan dan Pengelola Barang, maka
hanya dapat diberikan 1 (satu) honorarium.
Pejabat Penatausahaan
Keuangan (PPK)
Bendahara Penerima
66
11 Honorarium Reviu
1
1 Pengendali Mutu 130,000
2 Pembantu Penanggungjawab 197,500
3 Pengendali Teknis 225,000
4 Ketua Tim Pemeriksa 375,000
5 Anggota Tim Pemeriksa 280,000
6 62,500
12 Honorarium/Upah Pameran
NO SATUAN
1 3
1 Pemandu Per shift
2 Keamanan shift Pagi-Siang Per shift
3 Keamanan shift Malam Per shift
4 Kebersihan Hari
5 Petugas Kesehatan Per shift
Keterangan :
a. Satu hari satu malam maksimal 3 shift.
b. Satu shift maksimal 2 orang.
c. Pameran dalam DIY
13 Honorarium Penyelesaian Perkara
NO
1
Honor Kuasa Hukum (Non PNS)
a. Pengadilan Tingkat I
b. Pengadilan Tingkat II (Banding)
c. Pengadilan Tingkat Kasasi atau PK
Honor Saksi Ahli / Keterangan Ahli
a. PNS dan Non PNS Kab Kulon Progo
3 Biaya Pemeriksaan Setempat
4 Biaya Gugatan
5 Biaya Banding
6 Biaya Kasasi
7 Biaya Peninjauan Kembali (PK)
8 Biaya Pengambilan Putusan
9 Biaya Perkara 500,000
10 Biaya Legalisasi Alat Bukti (Pendaftaran Saksi) 5,000
11 Biaya Saksi 100,000
Keterangan :
-
-
-
14 Honorarium Proses Pro Justisia
1
1. Penyidik
Proses Acara Pemeriksaan Cepat Tilang 25,000
Proses Acara Pemeriksaan Cepat Tipiring 50,000
Proses Acara Pemeriksaan Singkat
2. Saksi
Proses Acara Pemeriksaan Cepat Tipiring 25,000
Proses Acara Pemeriksaan Singkat 150,000
3. Biaya Uji Lab
Keterangan :
1.
2. Biaya uji lab dibayarkan sesuai pengeluaran riil.
Honorarium proses pro justisi sudah termasuk biaya perjalanan dinas, uang dan/atau makan lembur.
NO JABATAN TIM BESARAN HONOR PER
KASUS (Rp.)
Perkara 500,000
Perkara
Orang
Orang/kedatangan
3
1,500,000
1,500,000
Saksi Ahli adalah orang yang mempunyai kepakaran di bidang ilmu pengetahuan tertentu, yang keterangannya
diperlukan dalam persidangan.
Honorarium Penyelesaian Perkara hanya dianggarkan di Bagian Hukum selaku kuasa hukum Pemda dalam rangka
menyelesaikan perkara Pemerintah Kabupaten Kulon Progo.
Besaran Biaya Operasional Bantuan Hukum (Litigasi dan Non Litigasi) yang diberikan kepada pihak ketiga atau
Jaksa Pengacara Negara ditetapkan oleh Bupati.
Perkara 1,000,000
Perkara 1,500,000
PNS dan Non PNS luar Kab Kulon Progo (diluar wilayah
DIY)
Orang/kedatangan 5,000,000
Perkara 3,258,000
Perkara 1,000,000
5,000,000
2
Orang/kedatangan 1,000,000
b. PNS dan Non PNS luar Kab Kulon Progo (dalam wilayah
DIY)
60,000
50,000
Staf Administrasi Pemeriksa
URAIAN HARGA (Rp.)
2 4
NO JABATAN BESARAN HONOR (Rp.)
2 3
1
Orang/perkara 15,000,000
Orang/perkara 5,000,000
Orang/perkara
50,000
60,000
JENIS HONOR /BIAYA SATUAN BESARAN HONOR (Rp)
60,000
2 3 4
Perkara 3,500,000
Orang/kedatangan 2,000,000
c.
2
67
15 Honorarium Operasi Pro Justisia dan Non Justisia
≤ 8 jam >8 - 12 Jam > 12 jam
1 3 4 5
1 Koordinator 50,000 85,000 105,000
2 Anggota 40,000 75,000 95,000
Keterangan :
1.
2.
16 Uang Sidang Majelis TPTGR (Tuntutan Perbendaharaan dan Tuntutan Ganti Rugi)
NO
1
Majelis TPTGR :
- Ketua Sidang 300,000
- 250,000
Panitera TPTGR :
- Koordinator 200,000
- 150,000
B. MAKAN MINUM
1. Jamuan Rapat
a. Belanja Makanan dan Minuman Rapat
NO SATUAN
1 3
1 Jamuan minum dan makanan kecil orang
2 Jamuan makan dengan dos/box orang
3 Jamuan rapat khusus di luar Kantor orang
Keterangan :
1.
2.
3.
4.
5.
6. Untuk setiap kali rapat harus mengikuti ketentuan sebagai berikut :
- Harus ada undangan.
- Harus ada daftar hadir peserta rapat.
- Harus ada Notulen rapat.
b. Jamuan rapat pada bulan Puasa
2. Belanja Makanan dan Minuman Tamu
1 3 4
1 Jamuan Penerimaan Tamu :
- Jamuan Minum dan Makanan kecil orang 10,000
- Jamuan Makan orang 25,000
- Jamuan Makan Tamu DPRD orang 40,000
2 Jamuan Tamu Bupati / Wakil Bupati / Tenaga Ahli Bupati :
- Di Wilayah Kabupaten Kulon Progo. orang 40,000
- Di tempat yang ditunjuk di luar Kab. Kulon Progo. orang 60,000
- Di wilayah Kabupaten Kulon Progo :
1. Tingkat Pusat orang 100,000
2. Tingkat Provinsi orang 75,000
3. Tingkat Kabupaten/Kota orang 50,000
- Di tempat lain yang ditunjuk di luar Kab. Kulon Progo. orang 175,000
2
Jamuan makan tamu tokoh masyarakat, tokoh agama, organisasi sosial,
parpol, pemuda, dan lain-lain
Jamuan makan tamu Pejabat Negara, Departemen, Non Departemen, Luar
Negeri dan Pihak III/Investor :
Pada bulan puasa, jamuan rapat dapat diberikan dalam bentuk natura/uang dengan dipotong pajak sesuai dengan
peraturan perundang-undangan yang berlaku.
NO PERINCIAN KEGIATAN SATUAN HARGA (Rp.)
1
Orang Kali
Anggota Orang Kali
2
Honorarium untuk kegiatan operasi durasinya kurang dari atau sama dengan 8 (delapan) jam sudah termasuk biaya
perjalanan dinas.
Honorarium untuk kegiatan operasi durasinya lebih dari 8 (delapan) jam sudah termasuk biaya perjalanan dinas,
uang dan/atau makan lembur.
JABATAN SATUAN BESARAN (Rp.)
NO JABATANLAMA/WAKTU OPERASI
25,000
100,000
2
Orang Kali
Anggota Orang Kali
PERINCIAN KEGIATAN
2 3 4
Jamuan rapat khusus di luar kantor hanya boleh digunakan dalam rangka memfasilitasi rapat-rapat
Bupati/Wakil Bupati
Rapat yang diselenggarakan sampai jam 12.00 WIB atau lebih dapat diberikan snack dan/atau makan siang.
Rapat yang diselenggarakan mulai jam 12.00 WIB atau lebih dapat diberikan snack dan/atau makan siang.
Rapat yang diselenggarakan mulai jam 19.00 WIB dapat diberikan snack dan/atau makan malam.
Rapat yang diselenggarakan dari pagi sampai dengan dan/atau lebih dari jam 19.00 WIB dapat diberikan
snack dan/atau makan dua kali.
Syarat-syarat tersebut harus dilampirkan pada penyampaian Surat Pertanggung Jawaban (SPJ) sesuai
peraturan perundang-undangan yang berlaku.
HARGA (Rp.)
2 4
10,000
68
Keterangan :
Untuk setiap kali penerimaan tamu harus mengikuti ketentuan sebagai berikut :
1.
2.
3.
4.
3. Belanja Makanan dan Minuman Sosialisasi/Bimtek/Workshop/Seminar/FGD
NO SATUAN
1 3
1. Snack dan minum Orang Kali 10,000
2. Makan :
- diselenggarakan di luar kantor Orang Kali 45,000
- diselenggarkan di dalam kantor Orang Kali 30,000
4. Belanja Makanan dan Minuman Harian Umum
1.
2.
3.
C. BIAYA USAHA JASA
1. Honorarium Jasa Konsultansi Non Konstruksi (Non PNS)
1 4
1 AHLI PRATAMA 1
2
3/1
4/2
2 AHLI MUDA 3/1
4/2
5/3
6/4
3 AHLI MADYA 7/5/1
8/6/2
9/7/3
10/8/4
4 AHLI UTAMA 11/9/5
12/10/6
13/11/7
14/12/8
15/13/9
16/14/10
15/11
16/12
Keterangan :
a. Honor Maksimal termasuk pajak Penghasilan (PPh).
b.
2. Biaya Langsung Personil Tenaga Ahli pada Usaha Jasa Konsultansi Konstruksi
S2 S3
1 3 5 6 7 8
1 1
2
3
4
2 5 1 5,200,000
6 2 5,500,000
7 3 5,800,000
8 4 6,100,000
4,800,000
5,100,000
5,400,000
5,700,000
6,000,000
2 4
3,900,000
4,200,000
4,500,000
AHLI
PRATAMA
AHLI MUDA
Pengalaman Kerja dihitung efektif (Tahun-Bulan) mulai dari pengangkatan pertama, baik dari Instansi Pemerintah
atau Lembaga Swasta Berbadan Hukum sampai tahun terakhir yang dihitung secara akumulatif.
NOTINGKAT
KEAHLIAN
TAHUN
PENGA-
LAMAN
TAHUN
PENGALAMAN
TAHUN
PENGALA
MANS1
S1/S2/S3 9,500,000
S2/S3 9,500,000
S2/S3 10,000,000
S1/S2/S3 8,000,000
S1/S2/S3 8,500,000
S1/S2/S3 9,000,000
S1/S2/S3 6,500,000
S1/S2/S3 7,000,000
S1/S2/S3 7,500,000
S1/S2/S3 5,000,000
S1/S2/S3 5,500,000
S1/S2/S3 6,000,000
S1/S2 3,500,000
S1/S2 4,000,000
S1/S2 4,500,000
D3/S1 2,000,000
D3/S1 2,500,000
S1/S2 3,000,000
2 3 5
D3 1,500,000
D3 1,500,000
Harus ada laporan pelaksanaan kegiatan.
Syarat-syarat tersebut harus dilampirkan pada penyampaian Surat Pertanggungjawaban (SPJ) sesuai peraturan
perundang-undangan.
NOTINGKAT
KEAHLIANPENDIDIKAN
TAHUN
PENGALAMAN
HONOR MAKSIMAL
PER BULAN (Rp.)
Jamuan makan tamu Bupati/Wakil Bupati/Tenaga Ahli Bupati dianggarkan pada Bagian Rumah Tangga dan
Protokol Sekretariat Daerah.
Organisasi Perangkat Daerah yang bergerak di bidang pelayanan, dapat menyediakan air mineral sebagai
pemenuhan Standar Pelayanan Publik.
PERINCIAN KEGIATAN
2
Untuk kegiatan-kegiatan yang bersifat insindentil dan bukan merupakan kegiatan rapat dapat diberikan konsumsi
setara jamuan rapat dengan ketentuan sebagai berikut :
Apabila tidak bisa melengkapi daftar hadir maka harus ada surat perintah atau Nota Dinas atau Memo dari
Pejabat yang berwenang.
Harus ada dokumen pemberitahuan/konfirmasi dari pihak tamu/datar hadir/ Nota Dinas atau Memo dari
Pejabat yang berwenang.
Syarat-syarat tersebut harus dilampirkan pada penyampaian Surat Pertanggung-jawaban (SPJ) sesuai
peraturan perundang-undangan yang berlaku.
HARGA (Rp)
4
HONOR/BLN HONOR/BLN HONOR/BLN
69
S2 S3
1 3 5 6 7 8
3 9 5 6,400,000 1 6,500,000
10 6 6,700,000 2 6,800,000
11 7 7,000,000 3 7,100,000
12 8 7,300,000 4 7,400,000
4 13 9 7,600,000 5 7,700,000
14 10 7,900,000 6 8,000,000
15 11 8,200,000 7 8,300,000
16 12 8,500,000 8 8,600,000
17 13 8,800,000 9 8,900,000
18 14 9,100,000 10 9,200,000
19 15 9,400,000 11 9,500,000
20 16 9,700,000 12 9,800,000
3. Honorarium Tenaga Pendukung pada Usaha Jasa Konsultansi
SLTA/D1/
D2D3/S1
HONOR/BLN HONOR/BLN
1 5 6
1. 1,700,000 2,200,000
1,925,000 2,400,000
2. 1,635,000 1,950,000
1,700,000 2,200,000
3. 1,635,000 1,750,000
1,650,000 1,950,000
4. Upah Tenaga Kontrak
No SatuanUpah
Maksimal
1 3 4
1 SLTA org/bulan 1,960,000
2 D3 org/bulan 2,070,000
3 S1 org/bulan 2,180,000
5 Upah Tenaga Harian
Keterangan :
1
2.
3.
4
5
D. BIAYA PERJALANAN DINAS
1. Uang Representasi, Uang Harian, Biaya Taksi dan Biaya Penginapan
a. Uang Representasi
1 3
1 BUPATI/WAKIL BUPATI OH 250,000 125,000
2 DPRD OH 250,000 125,000
3 PEJABAT ESELON II OH 150,000 75,000
LUAR DAERAH DALAM DAERAH
LEBIH DARI 8 (DELAPAN)
JAM
LEBIH DARI 8 (DELAPAN)
JAM
NO URAIAN SATUAN
BESARAN (Rp)
2
Tenaga Kontrak diikutkan dalam Kepesertaan BPJS Kesehatan (JKN)
Tenaga kontrak diikutkan dalam kepesertaan BPJS Ketanagakerjaan yaitu Jaminan Kecelakaan Kerja (JKK) dan
Jaminan Kematian (JKM)
Belanja Premi Asuransi Kesehatan (JKN) disamakan dengan ketentuan premi JKN ASN sebesar 3% untuk pegawai
honorer K2, Pegawai BLUD, dan GTT/PTT. Sedangkan Belanja Premi Asuransi Kesehatan (JKN) Tenaga Kontrak non
SK Bupati sebesar 4%.
Belanja Premi Jaminan Kecelakaan Kerja (JKK) sebesar 0,24 %
Belanja Premi Jaminan Kematian (JKM) sebesar 0,3 %.
2
Rp. 78.500,00 / hari
Surveyor 0 - 5
diatas 5
Pendidikan
Draftman/Juru
Gambar
0 - 5
diatas 5
Operator Komputer 0 - 5
diatas 5
9,600,000
NO PROFESI TAHUN PENGALAMAN
PENDIDIKAN
2 3
7,800,000
8,100,000
8,400,000
8,700,000
9,000,000
9,300,000
6,300,000
6,600,000
6,900,000
7,200,000
7,500,000
AHLI
MADYA
AHLI
UTAMA
NOTINGKAT
KEAHLIAN
TAHUN
PENGA-
LAMAN
HONOR/BLN TAHUN
PENGALAMAN
HONOR/BLNTAHUN
PENGALA
MAN
HONOR/BLN
S1
2 4
Biaya perjalanan dinas berupa Uang Representasi diberikan kepada Bupati, Wakil Bupati, Pimpinan dan Anggota
DPRD serta Pejabat Eselon II yang dibayarkan secara lumpsum selama melakukan perjalanan dinas luar daerah,
dalam provinsi DIY, maupun dalam daerah.
BESARAN (Rp)
4 5
70
b. Uang Harian, Biaya Taksi dan Biaya Penginapan
(≥ 8 Jam)
(Orang/Hari) (Orang/Kali) (Orang/Kali) (Orang/Hari)
1 4 5 6 7
Bupati/Wabup 530,000 236,000 512,000 5,850,000
Pimpinan DPRD 530,000 236,000 512,000 5,850,000
Anggota DPRD 530,000 236,000 512,000 1,490,000
Sekda 530,000 236,000 512,000 1,490,000
Eselon II 530,000 236,000 512,000 1,490,000
Eselon III/Gol.IV 530,000 236,000 512,000 992,000
Eselon IV/Gol.III 530,000 236,000 512,000 730,000
Gol II/I 530,000 236,000 512,000 730,000
Bupati/Wabup 370,000 236,000 892,000 5,725,000
Pimpinan DPRD 370,000 236,000 892,000 5,725,000
Anggota DPRD 370,000 236,000 892,000 2,373,000
Sekda 370,000 236,000 892,000 2,373,000
Eselon II 370,000 236,000 892,000 2,373,000
Eselon III/Gol.IV 370,000 236,000 892,000 1,000,000
Eselon IV/Gol.III 370,000 236,000 892,000 718,000
Gol II/I 370,000 236,000 892,000 718,000
Bupati/Wabup 430,000 236,000 332,000 5,381,000
Pimpinan DPRD 430,000 236,000 332,000 3,200,000
Anggota DPRD 430,000 236,000 332,000 2,800,000
Sekda 430,000 236,000 332,000 2,755,000
Eselon II 430,000 236,000 332,000 2,755,000
Eselon III/Gol.IV 430,000 236,000 332,000 1,006,000
Eselon IV/Gol.III 430,000 236,000 332,000 570,000
Gol II/I 430,000 236,000 332,000 570,000
Bupati/Wabup 370,000 236,000 150,000 4,242,000
Pimpinan DPRD 370,000 236,000 150,000 4,242,000
Anggota DPRD 370,000 236,000 150,000 1,480,000
Sekda 370,000 236,000 150,000 1,480,000
Eselon II 370,000 236,000 150,000 1,480,000
Eselon III/Gol.IV 370,000 236,000 150,000 954,000
Eselon IV/Gol.III 370,000 236,000 150,000 600,000
Gol II/I 370,000 236,000 150,000 600,000
Bupati/Wabup 410,000 236,000 388,000 4,400,000
Pimpinan DPRD 410,000 236,000 388,000 4,400,000
Anggota DPRD 410,000 236,000 388,000 1,605,000
Sekda 410,000 236,000 388,000 1,605,000
Eselon II 410,000 236,000 388,000 1,605,000
Eselon III/Gol.IV 410,000 236,000 388,000 1,076,000
Eselon IV/Gol.III 410,000 236,000 388,000 664,000
Gol II/I 410,000 236,000 388,000 664,000
Bupati/Wabup 360,000 236,000 246,000 4,420,000
Pimpinan DPRD 360,000 236,000 246,000 4,420,000
Anggota DPRD 360,000 236,000 246,000 3,526,000
Sekda 360,000 236,000 246,000 3,526,000
Eselon II 360,000 236,000 246,000 3,526,000
Eselon III/Gol.IV 360,000 236,000 246,000 1,294,000
Eselon IV/Gol.III 360,000 236,000 246,000 556,000
Gol II/I 360,000 236,000 246,000 556,000
Bupati/Wabup 370,000 236,000 464,000 4,960,000
Pimpinan DPRD 370,000 236,000 464,000 4,960,000
Anggota DPRD 370,000 236,000 464,000 1,518,000
7 Sekda 370,000 236,000 464,000 1,518,000
Eselon II 370,000 236,000 464,000 1,518,000
Eselon III/Gol.IV 370,000 236,000 464,000 1,100,000
Eselon IV/Gol.III 370,000 236,000 464,000 530,000
Gol II/I 370,000 236,000 464,000 530,000
JAWA TENGAH
5 JAWA TIMUR
6 ACEH
SUMATERA
UTARA
NO PROVINSI PELAKSANA
UANG
HARIAN
BIAYA TAKSI (PP)BIAYA
PENGINAPAN Kedudukan Tujuan
2 3
1 DKI JAKARTA
2 BANTEN
3 JAWA BARAT
4
Biaya perjalanan dinas berupa Uang Harian merupakan penggantian biaya keperluan sehari-hari pejabat negara,
pejabat daerah, Aparatur Sipil Negara, dan pihak lain dalam menjalankan perintah perjalanan dinas lebih dari 8
(delapan) jam. Uang Harian sudah meliputi uang saku, uang makan, dan keperluan transportasi lokal.
71
(≥ 8 Jam)
(Orang/Hari) (Orang/Kali) (Orang/Kali) (Orang/Hari)
1 4 5 6 7
Bupati/Wabup 370,000 236,000 188,000 3,820,000
Pimpinan DPRD 370,000 236,000 188,000 3,820,000
Anggota DPRD 370,000 236,000 188,000 3,119,000
Sekda 370,000 236,000 188,000 3,119,000
Eselon II 370,000 236,000 188,000 3,119,000
Eselon III/Gol.IV 370,000 236,000 188,000 1,650,000
Eselon IV/Gol.III 370,000 236,000 188,000 852,000
Gol II/I 370,000 236,000 188,000 852,000
Bupati/Wabup 370,000 236,000 274,000 4,275,000
Pimpinan DPRD 370,000 236,000 274,000 4,275,000
Anggota DPRD 370,000 236,000 274,000 1,854,000
9 Sekda 370,000 236,000 274,000 1,854,000
Eselon II 370,000 236,000 274,000 1,854,000
Eselon III/Gol.IV 370,000 236,000 274,000 1,037,000
Eselon IV/Gol.III 370,000 236,000 274,000 792,000
Gol II/I 370,000 236,000 274,000 792,000
Bupati/Wabup 370,000 236,000 294,000 4,000,000
Pimpinan DPRD 370,000 236,000 294,000 4,000,000
Anggota DPRD 370,000 236,000 294,000 3,337,000
Sekda 370,000 236,000 294,000 3,337,000
Eselon II 370,000 236,000 294,000 3,337,000
Eselon III/Gol.IV 370,000 236,000 294,000 1,212,000
Eselon IV/Gol.III 370,000 236,000 294,000 580,000
Gol II/I 370,000 236,000 294,000 580,000
Bupati/Wabup 380,000 236,000 380,000 5,236,000
Pimpinan DPRD 380,000 236,000 380,000 5,236,000
Anggota DPRD 380,000 236,000 380,000 3,332,000
11 Sekda 380,000 236,000 380,000 3,332,000
Eselon II 380,000 236,000 380,000 3,332,000
Eselon III/Gol.IV 380,000 236,000 380,000 1,353,000
Eselon IV/Gol.III 380,000 236,000 380,000 650,000
Gol II/I 380,000 236,000 380,000 650,000
Bupati/Wabup 380,000 236,000 256,000 5,850,000
Pimpinan DPRD 380,000 236,000 256,000 5,850,000
Anggota DPRD 380,000 236,000 256,000 3,083,000
12 Sekda 380,000 236,000 256,000 3,083,000
Eselon II 380,000 236,000 256,000 3,083,000
Eselon III/Gol.IV 380,000 236,000 256,000 1,571,000
Eselon IV/Gol.III 380,000 236,000 256,000 861,000
Gol II/I 380,000 236,000 256,000 861,000
Bupati/Wabup 380,000 236,000 334,000 4,491,000
Pimpinan DPRD 380,000 236,000 334,000 4,491,000
Anggota DPRD 380,000 236,000 334,000 2,067,000
Sekda 380,000 236,000 334,000 2,067,000
Eselon II 380,000 236,000 334,000 2,067,000
Eselon III/Gol.IV 380,000 236,000 334,000 1,140,000
Eselon IV/Gol.III 380,000 236,000 334,000 580,000
Gol II/I 380,000 236,000 334,000 580,000
Bupati/Wabup 380,000 236,000 218,000 2,071,000
Pimpinan DPRD 380,000 236,000 218,000 2,071,000
Anggota DPRD 380,000 236,000 218,000 1,628,000
Sekda 380,000 236,000 218,000 1,628,000
Eselon II 380,000 236,000 218,000 1,628,000
Eselon III/Gol.IV 380,000 236,000 218,000 1,546,000
Eselon IV/Gol.III 380,000 236,000 218,000 630,000
Gol II/I 380,000 236,000 218,000 630,000
Bupati/Wabup 410,000 236,000 180,000 3,827,000
Pimpinan DPRD 410,000 236,000 180,000 3,827,000
Anggota DPRD 410,000 236,000 180,000 2,838,000
15 Sekda 410,000 236,000 180,000 2,838,000
Eselon II 410,000 236,000 180,000 2,838,000
Eselon III/Gol.IV 410,000 236,000 180,000 1,957,000
Eselon IV/Gol.III 410,000 236,000 180,000 622,000
Gol II/I 410,000 236,000 180,000 622,000
Kedudukan Tujuan
2 3
SUMATERA
BARAT
SUMATERA
SELATAN
13 LAMPUNG
8 RIAU
KEPULAUAN
RIAU
10 JAMBI
14 BENGKULU
BANGKA
BELITUNG
NO PROVINSI PELAKSANA
UANG
HARIAN
BIAYA TAKSI (PP)BIAYA
PENGINAPAN
72
(≥ 8 Jam)
(Orang/Hari) (Orang/Kali) (Orang/Kali) (Orang/Hari)
1 4 5 6 7
Bupati/Wabup 480,000 236,000 318,000 4,890,000
Pimpinan DPRD 480,000 236,000 318,000 4,890,000
Anggota DPRD 480,000 236,000 318,000 1,946,000
Sekda 480,000 236,000 318,000 1,946,000
Eselon II 480,000 236,000 318,000 1,946,000
Eselon III/Gol.IV 480,000 236,000 318,000 990,000
Eselon IV/Gol.III 480,000 236,000 318,000 910,000
Gol II/I 480,000 236,000 318,000 910,000
Bupati/Wabup 440,000 236,000 462,000 3,500,000
Pimpinan DPRD 440,000 236,000 462,000 3,500,000
Anggota DPRD 440,000 236,000 462,000 2,648,000
17 Sekda 440,000 236,000 462,000 2,648,000
Eselon II 440,000 236,000 462,000 2,648,000
Eselon III/Gol.IV 440,000 236,000 462,000 1,418,000
Eselon IV/Gol.III 440,000 236,000 462,000 580,000
Gol II/I 440,000 236,000 462,000 580,000
Bupati/Wabup 430,000 236,000 216,000 3,000,000
Pimpinan DPRD 430,000 236,000 216,000 3,000,000
Anggota DPRD 430,000 236,000 216,000 1,493,000
18 Sekda 430,000 236,000 216,000 1,493,000
Eselon II 430,000 236,000 216,000 1,493,000
Eselon III/Gol.IV 430,000 236,000 216,000 1,355,000
Eselon IV/Gol.III 430,000 236,000 216,000 550,000
Gol II/I 430,000 236,000 216,000 550,000
Bupati/Wabup 380,000 236,000 270,000 2,654,000
Pimpinan DPRD 380,000 236,000 270,000 2,654,000
Anggota DPRD 380,000 236,000 270,000 1,538,000
19 Sekda 380,000 236,000 270,000 1,538,000
Eselon II 380,000 236,000 270,000 1,538,000
Eselon III/Gol.IV 380,000 236,000 270,000 1,125,000
Eselon IV/Gol.III 380,000 236,000 270,000 538,000
Gol II/I 380,000 236,000 270,000 538,000
Bupati/Wabup 360,000 236,000 222,000 4,901,000
Pimpinan DPRD 360,000 236,000 222,000 4,901,000
Anggota DPRD 360,000 236,000 222,000 3,391,000
20 Sekda 360,000 236,000 222,000 3,391,000
Eselon II 360,000 236,000 222,000 3,391,000
Eselon III/Gol.IV 360,000 236,000 222,000 1,160,000
Eselon IV/Gol.III 360,000 236,000 222,000 659,000
Gol II/I 360,000 236,000 222,000 659,000
Bupati/Wabup 380,000 236,000 300,000 4,797,000
Pimpinan DPRD 380,000 236,000 300,000 4,797,000
Anggota DPRD 380,000 236,000 300,000 3,316,000
21 Sekda 380,000 236,000 300,000 3,316,000
Eselon II 380,000 236,000 300,000 3,316,000
Eselon III/Gol.IV 380,000 236,000 300,000 1,500,000
Eselon IV/Gol.III 380,000 236,000 300,000 540,000
Gol II/I 380,000 236,000 300,000 540,000
Bupati/Wabup 430,000 236,000 900,000 4,000,000
Pimpinan DPRD 430,000 236,000 900,000 4,000,000
Anggota DPRD 430,000 236,000 900,000 2,188,000
22 Sekda 430,000 236,000 900,000 2,188,000
Eselon II 430,000 236,000 900,000 2,188,000
Eselon III/Gol.IV 430,000 236,000 900,000 1,507,000
Eselon IV/Gol.III 430,000 236,000 900,000 804,000
Gol II/I 430,000 236,000 900,000 804,000
Bupati/Wabup 430,000 236,000 204,000 4,000,000
Pimpinan DPRD 430,000 236,000 204,000 4,000,000
Anggota DPRD 430,000 236,000 204,000 2,188,000
23 Sekda 430,000 236,000 204,000 2,188,000
Eselon II 430,000 236,000 204,000 2,188,000
Eselon III/Gol.IV 430,000 236,000 204,000 1,507,000
Eselon IV/Gol.III 430,000 236,000 204,000 804,000
Gol II/I 430,000 236,000 204,000 804,000
NO PROVINSI PELAKSANA
UANG
HARIAN
BIAYA TAKSI (PP)BIAYA
PENGINAPAN Kedudukan Tujuan
2 3
BALI
NUSA
TENGGARA
BARAT
NUSA
TENGGARA
TIMUR
KALIMANTAN
BARAT
KALIMANTAN
TENGAH
KALIMANTAN
SELATAN
KALIMANTAN
TIMUR
KALIMANTAN
UTARA
16
73
(≥ 8 Jam)
(Orang/Hari) (Orang/Kali) (Orang/Kali) (Orang/Hari)
1 4 5 6 7
Bupati/Wabup 370,000 236,000 276,000 4,919,000
Pimpinan DPRD 370,000 236,000 276,000 4,919,000
Anggota DPRD 370,000 236,000 276,000 2,290,000
Sekda 370,000 236,000 276,000 2,290,000
Eselon II 370,000 236,000 276,000 2,290,000
Eselon III/Gol.IV 370,000 236,000 276,000 924,000
Eselon IV/Gol.III 370,000 236,000 276,000 782,000
Gol II/I 370,000 236,000 276,000 782,000
Bupati/Wabup 370,000 236,000 480,000 4,168,000
Pimpinan DPRD 370,000 236,000 480,000 4,168,000
Anggota DPRD 370,000 236,000 480,000 2,549,000
Sekda 370,000 236,000 480,000 2,549,000
Eselon II 370,000 236,000 480,000 2,549,000
Eselon III/Gol.IV 370,000 236,000 480,000 1,431,000
Eselon IV/Gol.III 370,000 236,000 480,000 764,000
Gol II/I 370,000 236,000 480,000 764,000
Bupati/Wabup 410,000 236,000 626,000 4,076,000
Pimpinan DPRD 410,000 236,000 626,000 4,076,000
Anggota DPRD 410,000 236,000 626,000 2,581,000
Sekda 410,000 236,000 626,000 2,581,000
Eselon II 410,000 236,000 626,000 2,581,000
Eselon III/Gol.IV 410,000 236,000 626,000 1,075,000
Eselon IV/Gol.III 410,000 236,000 626,000 704,000
Gol II/I 410,000 236,000 626,000 704,000
Bupati/Wabup 430,000 236,000 290,000 4,820,000
Pimpinan DPRD 430,000 236,000 290,000 4,820,000
Anggota DPRD 430,000 236,000 290,000 1,550,000
27 Sekda 430,000 236,000 290,000 1,550,000
Eselon II 430,000 236,000 290,000 1,550,000
Eselon III/Gol.IV 430,000 236,000 290,000 1,020,000
Eselon IV/Gol.III 430,000 236,000 290,000 732,000
Gol II/I 430,000 236,000 290,000 732,000
Bupati/Wabup 370,000 236,000 330,000 2,309,000
Pimpinan DPRD 370,000 236,000 330,000 2,309,000
Anggota DPRD 370,000 236,000 330,000 2,027,000
28 Sekda 370,000 236,000 330,000 2,027,000
Eselon II 370,000 236,000 330,000 2,027,000
Eselon III/Gol.IV 370,000 236,000 330,000 1,567,000
Eselon IV/Gol.III 370,000 236,000 330,000 951,000
Gol II/I 370,000 236,000 330,000 951,000
Bupati/Wabup 380,000 236,000 342,000 2,475,000
Pimpinan DPRD 380,000 236,000 342,000 2,475,000
Anggota DPRD 380,000 236,000 342,000 2,059,000
29 Sekda 380,000 236,000 342,000 2,059,000
Eselon II 380,000 236,000 342,000 2,059,000
Eselon III/Gol.IV 380,000 236,000 342,000 1,297,000
Eselon IV/Gol.III 380,000 236,000 342,000 786,000
Gol II/I 380,000 236,000 342,000 786,000
Bupati/Wabup 380,000 236,000 480,000 3,467,000
Pimpinan DPRD 380,000 236,000 480,000 3,467,000
Anggota DPRD 380,000 236,000 480,000 3,240,000
Sekda 380,000 236,000 480,000 3,240,000
Eselon II 380,000 236,000 480,000 3,240,000
Eselon III/Gol.IV 380,000 236,000 480,000 1,048,000
Eselon IV/Gol.III 380,000 236,000 480,000 667,000
Gol II/I 380,000 236,000 480,000 667,000
Bupati/Wabup 430,000 236,000 430,000 3,440,000
Pimpinan DPRD 430,000 236,000 430,000 3,440,000
Anggota DPRD 430,000 236,000 430,000 3,175,000
Sekda 430,000 236,000 430,000 3,175,000
Eselon II 430,000 236,000 430,000 3,175,000
Eselon III/Gol.IV 430,000 236,000 430,000 1,073,000
Eselon IV/Gol.III 430,000 236,000 430,000 600,000
Gol II/I 430,000 236,000 430,000 600,000
3
24SULAWESI
UTARA
25 GORONTALO
26SULAWESI
BARAT
SULAWESI
SULAWESI
TENGGARA
30 MALUKU
31MALUKU
UTARA
NO PROVINSI PELAKSANA
UANG
HARIAN
BIAYA TAKSI (PP)BIAYA
PENGINAPAN Kedudukan Tujuan
SULAWESI
TENGAH
2
SELATAN
74
(≥ 8 Jam)
(Orang/Hari) (Orang/Kali) (Orang/Kali) (Orang/Hari)
1 4 5 6 7
Bupati/Wabup 580,000 236,000 862,000 3,859,000
Pimpinan DPRD 580,000 236,000 862,000 3,859,000
Anggota DPRD 580,000 236,000 862,000 3,318,000
Sekda 580,000 236,000 862,000 3,318,000
Eselon II 580,000 236,000 862,000 3,318,000
Eselon III/Gol.IV 580,000 236,000 862,000 2,521,000
Eselon IV/Gol.III 580,000 236,000 862,000 829,000
Gol II/I 580,000 236,000 862,000 829,000
Bupati/Wabup 480,000 236,000 364,000 3,872,000
Pimpinan DPRD 480,000 236,000 364,000 3,872,000
Anggota DPRD 480,000 236,000 364,000 3,212,000
Sekda 480,000 236,000 364,000 3,212,000
Eselon II 480,000 236,000 364,000 3,212,000
Eselon III/Gol.IV 480,000 236,000 364,000 2,056,000
Eselon IV/Gol.III 480,000 236,000 364,000 718,000
Gol II/I 480,000 236,000 364,000 718,000
Keterangan :
1.
a.
-
-
b.
2. Biaya Penginapan :
a.
b.
i.
ii.
iii.
2. Biaya Tiket
1). Harga Tiket Bus Antar Kota dari Yogyakarta - PP
NO
1
1 Bandung 200,000 340,000 430,000
2 Denpasar 550,000 700,000 900,000
3 Jabodetabek 218,000 474,000 530,000
4 Lampung 600,000 790,000 890,000
5 Malang 220,000 300,000 400,000
6 Semarang 130,000 160,000 210,000
7 Surabaya 160,000 300,000 500,000
2). Harga Tiket Kereta Api dari Yogyakarta - PP
NOEKONOMI
(Rp)BISNIS (Rp)
1 3 4
1 Bandung 510,000 750,000 960,000 2,200,000
2 Jakarta 700,000 750,000 1,100,000 2,200,000
3 Surabaya 420,000 720,000 780,000 2,200,000
4 Malang 530,000 750,000 1,040,000 2,200,000
3
NO PROVINSI PELAKSANA
UANG
HARIAN
BIAYA TAKSI (PP)BIAYA
PENGINAPAN Kedudukan Tujuan
33 PAPUA BARAT
Satuan biaya taksi perjalanan dinas merupakan satuan biaya yang digunakan untuk perencanaan kebutuhan
biaya tarif satu kali perjalanan pulang pergi (PP) ke luar DIY.
Kedudukan : Biaya taksi dari tempat kedudukan ke Bandara/Stasiun/Terminal di kota kedudukan dan
sebaliknya
2 5 6
2 3 4 5
TUJUAN EKSEKUTIF (Rp) LUXURY (Rp)
TUJUAN EKONOMI (Rp) BISNIS (Rp) EKSEKUTIF (Rp)
Tujuan : Biaya taksi di kota tempat tujuan perjalanan dinas sejak dari bandara/stasiun /terminal kota
tujuan ke tempat yang menjadi tujuan pertama kali di kota tujuan (hotel/kantor), dan dari lokasi
terakhir di kota tujuan ke bandara/stasiun/terminal.
Biaya taksi dibayarkan sesuai dengan pengeluaran riil sepanjang dapat menujukkan bukti pengeluaran. Dalam
hal tidak terdapat bukti pengeluaran riil, diberikan maksimal sesuai satuan biaya sebagaimana diatur dalam
standar biaya dan dituangkan dalam daftar pengeluaran riil.
Biaya perjalanan dinas berupa Biaya Penginapan dibayarkan sesuai dengan pengeluaran riil dan biaya
penginapan merupakan tarif hotel batas tertinggi.
Dalam hal Perjalanan Dinas tidak menggunakan Biaya Penginapan maka berlaku ketentuan sebagai berikut:
Pelaksana perjalanan dinas diberikan biaya penginapan sebesar 30 % (tiga puluh persen) dari standar
biaya penginapan di kota tempat tujuan.
Biaya penginapan sebagaimana dimaksud pada angka (i) dibayarkan secara lumpsum yang dituangkan
dalam daftar pengeluaran riil.
Pelaksana perjalanan dinas selama 2 (dua) hari diberikan biaya penginapan selama 1 (satu) hari,
pelaksana perjalanan dinas selama 3 (tiga) hari diberikan biaya penginapan selama 2 (dua) hari dan
seterusnya.
Biaya Taksi :
32 PAPUA
2
75
3). Harga Tiket Pesawat Terbang dari Yogyakarta - PP
NO BISNIS (Rp)EKONOMI
(Rp)BISNIS (Rp)
1 3 4 6 7
1 Balikpapan 4,804,500 8,647,400 15. Medan 6,296,000 11,358,400
2 Banda Aceh 7,500,000 11,500,000 16. Manado 8,232,600 13,924,000
3 Banjarmasin 5,452,000 9,430,300 17. Padang 5,650,000 9,440,200
4 Batam 5,400,000 9,700,000 18. Palangkaraya 5,437,000 6,300,000
5 Bengkulu 5,200,000 8,347,800 19. Lampung 3,500,000 5,800,000
6 Biak 9,594,100 14,500,000 20. Palembang 4,040,000 8,756,000
7 Denpasar 3,000,000 5,255,500 21. Palu 6,600,000 9,500,000
8 Gorontalo 6,995,000 11,816,100 22. Pekan Baru 5,500,000 9,454,000
9 Jakarta 3,192,800 5,000,000 23. Pontianak 5,450,000 9,203,700
10 Jambi 4,842,600 10,621,000 24. Surabaya 2,773,500 5,730,000
11 Jayapura 15,500,000 25. Tarakan 5,650,700 7,000,000
12 Kendari 6,550,000 8,989,000 26. Timika 9,490,700 11,500,000
13 Kupang 7,503,000 10,883,300 27. Makassar 4,786,000 9,408,400
14 Mataram 4,598,050 6,415,000
Keterangan :
1.
2.
a.
b.
c.
3. Biaya Sewa Kendaraan Perjalanan Dinas
a. Sewa Kendaraan Dalam Kota
BESARAN BESARAN
(Per Hari) (Per Hari)
1 4 6
1 DKI JAKARTA 911,000 18. NUSA TENGGARA TIMUR 857,000
2 BANTEN 777,000 19. KALIMANTAN BARAT 868,000
3 JAWA BARAT 932,000 20. KALIMANTAN TENGAH 1,177,000
4 JAWA TENGAH 1,016,000 21. KALIMANTAN SELATAN 778,000
5 JAWA TIMUR 966,000 22. KALIMANTAN TIMUR 1,100,000
6 ACEH 930,000 23. KALIMANTAN UTARA 1,100,000
7 SUMATERA UTARA 975,000 24. SULAWESI UTARA 956,000
8 RIAU 978,000 25. GORONTALO 792,000
9 KEPULAUAN RIAU 901,000 26. SULAWESI BARAT 772,000
10 JAMBI 804,000 27. SULAWESI SELATAN 796,000
11 SUMATERA BARAT 783,000 28. SULAWESI TENGAH 824,000
12 SUMATERA SELATAN 1,212,000 29. SULAWESI TENGGARA 839,000
13 LAMPUNG 846,000 30. MALUKU 947,000
14 BENGKULU 777,000 31. MALUKU UTARA 965,000
15 BANGKA BELITUNG 1,258,000 32. PAPUA 1,107,000
16 BALI 925,000 33. PAPUA BARAT 1,059,000
17 NUSA TENGGARA BARAT 882,000
b. Sewa kendaraan ke lokasi Transmigrasi per hari : Rp 1,500,000
Keterangan :
1.
2.
3.
Dalam hal perjalanan telah menggunakan sewa kendaraan dalam kota di tempat tujuan, maka tidak diberikan uang
transportasi lokal.
Biaya sewa kendaraan ke lokasi transmigrasi digunakan untuk sewa mobil/perahu klothok/speedboat dalam
rangka pengawalan Calon Transmigrans dan peninjauan lokasi yang cukup jauh dan terpencil yang
dipertanggungjawabkan sesuai dengan penggunaan riil dan apabila tidak diperoleh bukti pengeluaran yang sah
dapat menggunakan Daftar Pengeluaran Riil.
NO PROVINSI PROVINSI
2 5
Sewa Kendaraan dalam Kota, dapat diberikan kepada Bupati dan Wakil Bupati untuk keperluan pelaksanaan tugas
di tempat tujuan dan dibayarkan sesuai dengan pengeluaran riil.
11,736,400
Tiket dibayarkan sesuai dengan pengeluaran riil harga tiket berdasarkan tarif yang berlaku, dengan ketentuan sebagai
berikut :
Bupati dan Wakil Bupati dapat menggunakan pesawat terbang bisnis, kereta api eksekutif atau bus eksekutif.
Ketua DPRD, Wakil Ketua DPRD, Anggota DPRD, Sekretaris Daerah, Pejabat Eselon II, III, IV, dan Staf dapat
menggunakan pesawat terbang ekonomi, kereta api eksekutif atau bus eksekutif.
Kereta api Luxury hanya dapat digunakan oleh Bupati/Wakil Bupati, DPRD, dan Pejabat Eselon II.
2 5
Biaya perjalanan dinas berupa biaya tiket diberikan dalam rangka perjalanan dinas ke luar DIY.
TUJUAN EKONOMI (Rp) TUJUAN
76
4. Perjalanan Dinas ( Dalam Provinsi DIY )
1 420,000 170,000
2 420,000 170,000
3 420,000 170,000
4 420,000 170,000
5 420,000 170,000
6 420,000 170,000
7 420,000 170,000
8 420,000 170,000
Keterangan Umum :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
a.
b.
c.
11.
12 Surat Perintah Perjalanan Dinas (SPPD) diterbitkan dan berlaku hanya untuk 1 (satu) kali penugasan.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Biaya perjalanan dinas untuk tujuan di dalam Pulau Jawa paling lama 3 (tiga) hari dan di luar Pulau Jawa paling
lama 4 (empat) hari sedangkan, perjalanan dinas ke lokasi transmigrasi dapat diberikan paling lama 7 (tujuh) hari.
Pada kondisi tertentu perjalanan dinas dapat melebihi ketentuan lama perjalanan dinas dengan mendapat
persetujuan Sekretaris Daerah selaku Ketua TAPD.
Uang perjalanan dinas diberikan bagi pelaksana Perjalanan Dinas Luar Daerah Dalam Provinsi DIY dan Dalam
Kabupaten yang dilaksankan lebih dari 8 (delapan) jam.
Komponen waktu perjalanan dinas meliputi waktu perjalanan berangkat, waktu kegiatan, dan waktu perjalanan
pulang. Waktu pelaksanaan perjalanan dinas dituangkan dalam Laporan hasil perjalanan dinas dan
mempertimbangkan asas kewajaran dan kepatutan.
Perjalanan Dinas Luar Daerah, Luar Daerah Dalam Provinsi DIY dan Dalam Daerah yang ditempuh kurang dari 8
(delapan) jam, hanya dapat diberikan biaya transportasi lokal.
Biaya transportasi lokal dapat diberikan apabila Perjalanan Dinas dilaksanakan dengan menggunakan Kendaraan
Umum, dan dibayarkan sesuai pengeluaran riil (at cost ) yang dibuktikan dengan kwitansi atau bukti pengeluaran
riil.
Perjalanan dinas luar daerah provinsi dalam rangka menghadiri rapat, konsultasi, pengiriman laporan dan lain-lain
ataupun kegiatan yang dapat diselesaikan 1 (satu) hari dan ditempuh lebih dari 1 (satu) hari dalam perjalanan
pulang pergi dapat diberikan uang perjalanan dinas maksimal 2 (dua) hari.
Surat Perjalanan Dinas harus diketahui/ditandatangani oleh Pejabat/Kepala dari Instansi/Pimpinan
Organisasi/Perusahaan atau pejabat yang mewakili dari instansi yang dituju, sedang untuk melaksanakan
perjalanan dinas harus diterbitkan surat perintah tugas.
Sekretaris Daerah atas nama Bupati untuk Bupati, Wakil Bupati, Sekretaris Daerah, Staf Ahli Bupati, Tenaga
Ahli Bupati, Asisten Sekretaris Daerah dan Kepala SKPD.
Perjalanan dinas dalam daerah/dalam provinsi dengan beberapa tujuan yang dapat ditempuh dalam satu hari dan
waktu perjalanan dinas lebih dari 8 (delapan) jam, hanya diberikan biaya perjalanan dinas 1 (satu) kali dan
Dibuktikan dengan Cap SKPD/lokasi/tempat tujuan perjalanan dinas.
Perjalanan Dinas Luar Daerah dalam provinsi DIY, dapat diberikan Biaya penginapan sepanjang dibuktikan dengan
Surat Undangan dari Penyelenggara Kegiatan yang menuangkan bahwa biaya akomodasi penginapan tidak
ditanggung penyelenggara.
Besaran Biaya penginapan untuk perjalanan dinas dalam propinsi DIY mengacu pada Standar Sewa Kamar Hotel
Non Paket pada Penyelenggaraan Kegiatan di Luar Kantor, dan dibayarkan sesuai pengeluaran riil yang dibuktikan
dengan kwitansi atau bukti pembayaran yang sah, dan tidak berlaku pengambilan sebesar 30% dari standar biaya
penginapan ketika tidak menggunakan biaya penginapan di DIY.
Istri Bupati dan Istri Wakil Bupati dalam rangka mendukung tugas-tugas penyelenggaraan Pemerintahan diberikan
perjalanan dinas sesuai dengan eselon II (tanpa uang representasi).
Perjalanan dinas yang dilaksanakan oleh non PNSD Kabupaten Kulon Progo hanya diperbolehkan bagi mereka yang
melaksanakan tugas kedinasan Pemerintah Kabupaten Kulon Progo, dalam rangka mendukung pelaksanaan
kegiatan. Untuk tokoh masyarakat dapat diberikan belanja perjalanan setingkat dengan golongan III, dan
kader/tenaga Kontrak diberikan belanja perjalanan setingkat dengan golongan II.Pakar/Ahli/Praktisi/Tokoh Masyarakat di luar PNS Kulon Progo yang bertaraf Nasional dapat diberikan biaya tiket,
taksi, dan penginapan. Apabila tiket kepulangan tidak diperoleh, maka dibuktikan dengan Daftar Pengeluaran Riil
dan Surat Pernyataan bermaterai dari Penerima.
Dalam hal angka 8 tidak terpenuhi maka SPPD dimintakan pengesahan kepada pejabat instansi Pemerintah
setempat.
NO PELAKSANALEBIH DARI 8 (DELAPAN)
JAM
LEBIH DARI 8 (DELAPAN)
JAM
BESARAN / OH BESARAN / OH
BUPATI/WAKIL BUPATI
PIMPINAN DPRD
ANGGOTA DPRD
SEKDA
ESELON II
ESELON III/Gol. IV
ESELON IV/Gol. III
GOL II/I
LUAR DAERAH DALAM DAERAH
Surat Perintah Tugas ke luar DIY ditandatangani oleh :
Ketua DPRD untuk Ketua DPRD, Wakil Ketua dan Anggota DPRD.
Kepala SKPD/Unit Kerja untuk pejabat di bawahnya.
Surat Perintah Tugas Dalam DIY ditandatangani oleh kepala SKPD/Unit Kerja.
Biaya Perjalanan Dinas Ke Luar Negeri mengacu pada Peraturan Menteri Keuangan RI dan Peraturan Menteri Dalam
Negeri RI.
Laporan pelaksanaan tugas/laporan hasil perjalanan dinas dilampirkan dalam Surat Pertanggung Jawaban (SPJ).
Dalam hal komponen biaya perjalanan dinas ditanggung oleh penyelenggara (biaya penginapan dan/tiket dan/biaya
taksi), maka uang/biaya komponen tersebut tidak dibayarkan.
77
22. Perjalanan Dinas pendampingan dengan ketentuan :
a. Jumlah pendamping
b. SPJ pendampingan dengan melampirkan jadwal acara.
c. SPJ Pendamping sama dengan yang didampingi.
23.
24.
25.
Yang bertanda tangan di bawah ini :
Nama : ………………………………………………………………………………
NIP : ………………………………………………………………………………
Jabatan : ………………………………………………………………………………
1
NO
2
Demikian pernyataan ini kami buat dengan sebenarnya, untuk dipergunakan sebagaimana mestinya.
Mengetahui/ Menyetujui : ………….., tanggal-bulan-tahun
PA/ KPA Pelaksana SPD,
……………………. …………………….
NIP……………….. NIP………………..
E. KEGIATAN PENGEMBANGAN SUMBER DAYA MANUSIA
1. Penyelenggaraan Pendidikan dan Pelatihan Pegawai.
NO
1
I. Gaji/Upah
1 Penceramah Ahli 800,000 /OH
2 Penceramah Umum 500,000 /OK
3 Pengajar pada pendidikan Pelatihan / Penataran. 200,000 /OJ
400,000 /OJ
5 550,000 /JPL
6 250,000 /JPL
7 175,000 /JPL
8 Pembimbing Observasi Lapangan 450,000 /JPL
Tiket untuk narasumber, biaya taksi, biaya sewa kendaraan dan/atau biaya penginapan apabila tidak diperoleh
bukti pengeluaran yang sah dapat menggunakan Daftar Pengeluaran Riil dengan format sebagai berikut :
Narasumber/Instruktur dari Kulon Progo
Jumlah yang didampingi Pendamping
s/d 5 orang 1 orang
6 - 15 orang 2 orang
16 - 25 orang 3 orang
lebih dari 25 orang 4 orang
2 3 4
Tiket untuk narasumber, biaya taksi, biaya penginapan, dan/atau biaya sewa kendaraan di bawah ini yang tidak dapat
diperoleh bukti-bukti pengeluarannya, meliputi :
URAIAN JUMLAH
Jumlah
Jumlah uang tersebut pada angka 1, di atas benar-benar dikeluarkan untuk pelaksanaan Perjalanan Dinas dimaksud
dan apabila dikemudian hari terdapat kelebihan atas pembayaran, kami bersedia untuk menyetorkan kelebihan tersebut
URAIAN BESARAN (Rp.) KETERANGAN
DAFTAR PENGELUARAN RIIL
Berdasarkan Surat Perjalanan Dinas (SPD) Nomor ……………………… tanggal………………….., dengan ini kami menyatakan
dengan sesungguhnya bahwa :
Pendamping Bupati, Wakil Bupati, Pimpinan Dewan diberikan biaya penginapan berdasarkan standar di Kota
tempat tujuan, sesuai eselon atau golongan pendamping.
Perjalanan Dinas yang ditempuh dengan menggunakan kendaraan dinas atau menyewa kendaraan umum, maka
dapat diberikan biaya tol (at cost ).
Perjalanan Dinas yang ditempuh dengan menggunakan kendaraan dinas atau menyewa kendaraan umum, tidak
diberikan komponen biaya transportasi lokal dan biaya taksi.
4 Tenaga Pengajar Khusus (Lembaga Pemerintah Non
Departemen dan Departemen)
Narasumber/Instruktur dari Luar DIY
Narasumber/Instruktur dari luar Kulon Progo Dalam DIY
78
NO
1
9 Pendamping Observasi Lapangan/ Fasilitator 500,000 /OH
10 Asisten Pendamping Observasi Lapangan 125,000 /OJ
11 Pengarahan / Penjelasan 200,000 /JPL
12 Tim Teaching dan Olahraga 150,000 /OJ
13 Pembuatan Makalah 150,000 /OS
14 Karya Tulis Buletin 100,000 /OM
15 Petugas Piket 85,000 /OH
16 Pengawas Ujian dari Pusat 200,000 /OH
17 Pengawas Ujian dari Daerah 100,000 /OH
18 Pengawas Ujian CAT LKPP 2,000,000 /hari
19 Pemeriksa Ujian 1,500 /lembar
20 850,000 /naskah
21 340,000 /naskah
22 Protokol 85,000 /OH
II Bahan :
1 Modul Diklat 300,000 /buah
2 Pertolongan Pertama pada Kecelakaan (P3K) 500,000 /A
III Lain-lain
1 Konsumsi
- Snack dan minum 10,000 /OK
- Makan 40,000 /OK
- Tas Peserta Diklat 150,000 /buah
2 3,000,000 /OA
3 Biaya Pembinaan Diklat Pola Kemitraan 3,000,000 /A
4 Biaya sertifikasi peserta diklat pola kemitraan 100,000 /OA
5 Biaya Monitoring dan Evaluasi 5,000,000 /A
6 Dokumentasi dan Publikasi 250,000 /A
7 Registrasi 50,000 /O
IV Biaya Penyusunan Laporan
1 Diklat Pimpinan IV 300,000 /OA
2 Diklat Pimpinan III 500,000 /OA
3 Diklat Pimpinan II 750,000 /OA
V 30% dari uang harian
selama penugasan.
VI Biaya Pengiriman Diklat Struktural
1 Diklat Pimpinan IV 20,230,000 /OA
2 Diklat Pimpinan III 22,125,000 /OA
3 Diklat Pimpinan II 30,261,000 /OA
VII Uang Saku Peserta
1 Diklat Pimpinan IV 3,000,000 /OA
2 Diklat Pimpinan III 4,000,000 /OA
3 Diklat Pimpinan II 5,000,000 /OA
VIII Uang Saku Peserta Prajabatan
1 Prajabatan III 250,000 /OA
2 Prajabatan II dan I 200,000 /OA
IX Uang Saku Peserta Kursus Diklat Teknis
75,000 /OH
50,000 /OH
X Biaya Pengiriman Diklat Prajabatan (Reguler)
1 Prajabatan III 5,545,000 /OA
2 Prajabatan II dan I 4,470,000 /OA
Keterangan :
OA = Orang Angkatan OJ = Orang Jam
JPL = Jam Pelajaran(45 menit) OK = Orang Kali
OH = Orang Hari A = Angkatan
OM = Orang Makalah S = Siswa
OS = Orang Session
Penyelenggaraan Diklat :
- Jumlah JPL, Hari (minimum) : 8 JPL
- Jumlah Peserta (minimum) : 15 orang
- Panitia Penyelenggara (Maks) : 20 %
dari jumlah peserta
URAIAN BESARAN (Rp.) KETERANGAN
2 3 4
Penyusun Naskah Ujian dari
Penyusun Naskah Ujian dari
Biaya Sewa Ruang
Biaya Orientasi Kepemimpinan dan Penyelenggaraan
Pemerintahan Daerah bagi Bupati dan Wakil Bupati dan
sejenisnya.
Sesuai dengan Peraturan
LAN RI
1 Peserta Kursus/Diklat Teknis yang dilaksanakan di luar
Kulon Progo dalam Provinsi DIY dapat diberikan uang
saku maksimal 4 (empat) hari
2 Peserta Kursus/Diklat Teknis yang dilaksanakan di
Kulon Progo dapat diberikan uang saku maksimal 4
(empat) hari
Sesuai dengan Peraturan
LAN RI
79
2. Penyelenggaraan Penyusunan Formasi dan Pengadaan PNS
NO
1
1 Panitia Penyusun Formasi PNS 50,000 /OH
2 Panitia Pengentri e-formasi 50,000 /OH
3 Panitia Administrasi Pendaftaran CPNS 50,000 /OH
4 Panitia Verifikasi Pendaftaran CPNS 100,000 /OH
5 Panitia Pengelola Teknologi Informasi Pendaftaran CPNS 75,000 /OH
6 Panitia Keamanan Ujian 100,000 /OH
7 Panitia Pengendali Ujian 150,000 /OH
8 Koordinator Panitia Pengawas Ujian CAT dari BKN 350,000 /OH
9 Anggota Panitia Pengawas Ujian CAT dari BKN 150,000 /OH
10 Panitia Teknis Ujian CAT 100,000 /OH
11 Panitia Verifikator Hasil Tes yang dinyatakan Lulus 75,000 /OH
12 Panitia Pemberkasan 50,000 /OH
13 Panitia Penyerahan SK CPNS 50,000 /OH
3. Penyelenggaraan Pengadaan Pegawai Non PNS
NO
1
1 Panitia Penyusun Formasi Tenaga Kontrak 50,000 /OH
2 Panitia Verifikasi dan Validasi Data 100,000 /OH
3 Panitia Administrasi Pendaftaran 50,000 /OH
4 Panitia Pengelola Teknologi Informasi Pendaftaran 75,000 /OH
5 Panitia Keamanan Ujian 100,000 /OH
6 Panitia Pengendali Ujian 150,000 /OH
7 Panitia Verifikator Hasil Tes yang dinyatakan Lulus 75,000 /OH
8 Pengawas Ujian 100,000 /OH
9 Pembuat Soal Ujian 200,000 /materi
10 Penguji Wawancara 200,000 /materi
11 Penguji Praktek 200,000 /materi
Keterangan : Pengadaan non PNS/Tenaga Kontrak dikelola oleh BKPP
4.
NO
1
a. Gaji/Upah :
1. Penceramah/Instruktur Bimbingan Teknis
150,000 /JPL
- Dari Luar Kulon Progo 200,000 /JPL
2. Penceramah/Instruktur Sosialisasi
75,000 /JPL
- Dari Luar Kulon Progo 150,000 /JPL
50,000 /OH Maks: 2 hari per angkatan
4. Pembuat Makalah 150,000 /OS
50,000 /OH Non PNS
6. Uang saku Peserta Pelatihan Nelayan 100,000 /OH Non PNS
b. Lain-lain :
- Dokumentasi, publikasi, laporan 75,000 /A
5.
NOBESARAN
(Rp.)SATUAN
1 3 4
I
1 Nasional 1,800,000 OH
2 Regional 1,250,000 OH
3 Daerah 500,000 OH
4 Lokal 250,000 OH
II Narasumber dari PNS Kulon Progo :
1 Sekda 500,000 OH
2 PNS Esselon II/JPT 350,000 OH
2 PNS Esselon III/Administrator 250,000 OH
3 PNS Esselon IV/Pengawas 200,000 OH
4 Pejabat Fungsional 200,000 OH
III Moderator 200,000 OH
IV Pembuatan Makalah 150,000 OS
V Penyusunan Dokumen : Pendampingan
1 Nasional 2,500,000 OB
2 Regional 2,000,000 OB
5
5. Uang saku peserta Bimbingan
Teknis/Sosialisasi/Rapat
Narasumber di Luar PNS Kulon Progo :
Penyelenggaraan Workshop/Seminar/Lokakarya/Konsultasi Pakar/Reses/Penyusunan Dokumen
KUALIFIKASI KETERANGAN
2
2 3 4
- Dari Kulon Progo
- Dari Kulon Progo
3. Tim Penyelenggara Bimtek/Sosialisasi
2 3
Penyelenggaraan Bimbingan Teknis/Sosialisasi
KUALIFIKASI BESARAN / HARI (Rp.) KETERANGAN
URAIAN BESARAN (Rp.)
2 3
URAIAN BESARAN (Rp.)
80
Keterangan :
a. Nasional : Mereka yang menjabat/pernah menjabat sebagai :
1). Pejabat Negara Pusat, Pejabat Eselon I Pusat,
2). Dosen Perguruan Tinggi berpendidikan minimal S3
3). Direktur Utama/Direktur Perusahaan Negara/Swasta bertaraf Nasional,
4). Tokoh/Lembaga yang mempunyai reputasi taraf Nasional.
b. Regional : Mereka yang menjabat/pernah menjabat sebagai :
1). Pejabat Negara Provinsi/Kabupaten/Kota, Pejabat Eselon I/II Provinsi,
2). Dosen Perguruan Tinggi berpendidikan minimal S2
3). Direktur Utama /Direktur Perusahaan Daerah/Swasta bertaraf Regional,
4). Tokoh/Lembaga yang mempunyai reputasi taraf Regional.
c. Daerah : Mereka yang menjabat/pernah menjabat sebagai :
1). Pimpinan dan Anggota DPRD Kabupaten Kulon Progo,
2). Direktur Utama/Direktur Perusahaan Daerah/Swasta bertaraf Kabupaten Kulon Progo,
3). Tokoh/Lembaga yang mempunyai reputasi taraf Kabupaten Kulon Progo.
d. Lokal : Mereka yang menjabat/pernah menjabat sebagai :
Tokoh/Lembaga Kemasyarakatan tingkat Kecamatan/Desa
6. Pengiriman Peserta Pendidikan dan Pelatihan (Diklat)
a. Peserta dapat diberikan :
-
-
-
b.
NO SATUAN BESARAN
1 3 4
1 OH 110,000
2 OH 110,000
3 OH 110,000
4 OH 110,000
5 OH 110,000
6 OH 110,000
7 OH 110,000
8 OH 110,000
9 OH 110,000
10 OH 120,000
11 OH 110,000
12 OH 130,000
13 OH 160,000
14 OH 110,000
15 OH 130,000
16 OH 120,000
17 OH 140,000
18 OH 130,000
19 OH 130,000
20 OH 110,000
21 OH 110,000
22 OH 110,000
23 OH 130,000
24 OH 130,000
25 OH 110,000
26 OH 110,000
27 OH 120,000
28 OH 130,000
29 OH 110,000
30 OH 110,000
Sulawesi Utara
Sulawesi Tengah
Sulawesi Tenggara
Banten
Jawa Barat
DKI Jakarta
Jawa Tengah
D.I. Yogyakarta
Jawa Timur
Bali
Nusa Tenggara Barat
Nusa Tenggara Timur
Kalimantan Barat
Kalimantan Tengah
Kalimantan Selatan
Kalimantan Timur
Kalimantan Utara
Gorontalo
Sulawesi Barat
Sulawesi Selatan
Besaran uang harian diklat sebagai berikut :
PROVINSI
Aceh
Sumatera Utara
Riau
Bengkulu
Sumatera Selatan
Lampung
Kepulauan Riau
Jambi
Sumatera Barat
Bangka Belitung
Uang Representasi diberikan kepada Bupati/Wabup, Pimpinan/Anggota DPRD dan Pejabat Eselon II sesuai
standar perjalanan dinas dalam SHBJ.
Pengiriman pejabat/pegawai yang mengikuti kegiatan Diklat/Bimtek/Workshop/Lokakarya dan sejenisnya yang biaya
akomodasinya ditanggung penyelenggara atau membayar kontribusi ke penyelenggara berlaku ketentuan sebagai berikut
:
biaya taksi 1 kali dan biaya tiket PP sesuai dengan standar perjalanan dinas dalam SHBJ.
uang harian diklat dapat diberikan sejak keberangkatan selama mengikuti diklat dan sampai dengan
kepulangan.
2
81
F.
NO
1
1. Di Kulon Progo
A. Paket
1. Halfday 180,000 /OH
2. Fullday 240,000 /OH
3. Fullboard 360,000 /OH
B. Non Paket
1. Sewa kamar hotel
- Deluxe 550,000 /OH
- Standar 360,000 /OH
2. Konsumsi
- Snack dan minum 10,000 /OK
- Makan 45,000 /OK
3. Sewa Ruang Rapat 1,500,000 /hari
2. Di Luar Kulon Progo
A. Paket
1. Halfday 250,000 /OH
2. Fullday 430,000 /OH
3. Fullboard
- Single 1,100,000 /OH
- Twinshare medium 745,000 /OH
- Twinshare standar 775,000 /OH
B. Non Paket
1. Sewa kamar hotel
- Deluxe 1,365,000 /hari
- Standar 970,000 /hari
2. Konsumsi
- Snack dan minum 60,000 /OK
- Makan 100,000 /OK
3. Sewa Ruang Rapat 8,250,000 /hari
Keterangan :
1.
2.
3.
4.
G.
1. DKI JAKARTA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 530,000 236,000 512,000
2 Pimpinan DPRD 530,000 236,000 512,000
3 Anggota DPRD 530,000 236,000 512,000
4 Sekda 530,000 236,000 512,000
5 Eselon II 530,000 236,000 512,000
6 Eselon III/Gol.IV 530,000 236,000 512,000
7 Eselon IV/Gol.III 530,000 236,000 512,000
8 Gol II/I 530,000 236,000 512,000
Paket Halfday disediakan untuk paket kegiatan rapat/pertemuan yang diselenggarakan di luar kantor minimal 5
(lima) jam tanpa menginap.
Paket fullday disediakan untuk paket kegiatan rapat/pertemuan yang diselenggarakan di luar kantor minimal 8
(delapan) jam tanpa menginap.
Paket fullboard disediakan untuk paket kegiatan rapat/pertemuan yang diselenggarakan di luar kantor sehari
penuh dan menginap.
Paket fullboard single dan sewa kamar hotel deluxe digunakan untuk Bupati/Wabup, Pimpinan/Anggota DPRD dan
Pejabat Eselon II.
PENYELENGGARAAN KEGIATAN DI LUAR KANTOR
URAIAN BESARAN (Rp.) KETERANGAN
2 3 4
kota tujuan :
a. Bus Besar : 3.439.000/hr
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
PENYELENGGARAAN KEGIATAN KUNJUNGAN KERJA/STUDI BANDING DAN SEJENISNYA
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ b. Bus Sedang : 2.221.000/hr
c. Mobil roda 4 : 911.000/hr
82
2. BANTEN
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 892,000
2 Pimpinan DPRD 370,000 236,000 892,000
3 Anggota DPRD 370,000 236,000 892,000
4 Sekda 370,000 236,000 892,000
5 Eselon II 370,000 236,000 892,000
6 Eselon III/Gol.IV 370,000 236,000 892,000
7 Eselon IV/Gol.III 370,000 236,000 892,000
8 Gol II/I 370,000 236,000 892,000
3. JAWA BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 332,000
2 Pimpinan DPRD 430,000 236,000 332,000
3 Anggota DPRD 430,000 236,000 332,000
4 Sekda 430,000 236,000 332,000
5 Eselon II 430,000 236,000 332,000
6 Eselon III/Gol.IV 430,000 236,000 332,000
7 Eselon IV/Gol.III 430,000 236,000 332,000
8 Gol II/I 430,000 236,000 332,000
4. JAWA TENGAH
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 150,000
2 Pimpinan DPRD 370,000 236,000 150,000
3 Anggota DPRD 370,000 236,000 150,000
4 Sekda 370,000 236,000 150,000
5 Eselon II 370,000 236,000 150,000
6 Eselon III/Gol.IV 370,000 236,000 150,000
7 Eselon IV/Gol.III 370,000 236,000 150,000
8 Gol II/I 370,000 236,000 150,000
5. JAWA TIMUR
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 410,000 236,000 388,000
2 Pimpinan DPRD 410,000 236,000 388,000
3 Anggota DPRD 410,000 236,000 388,000
4 Sekda 410,000 236,000 388,000
5 Eselon II 410,000 236,000 388,000
6 Eselon III/Gol.IV 410,000 236,000 388,000
7 Eselon IV/Gol.III 410,000 236,000 388,000
8 Gol II/I 410,000 236,000 388,000
6. ACEH
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 360,000 236,000 246,000
2 Pimpinan DPRD 360,000 236,000 246,000
3 Anggota DPRD 360,000 236,000 246,000
4 Sekda 360,000 236,000 246,000
5 Eselon II 360,000 236,000 246,000
6 Eselon III/Gol.IV 360,000 236,000 246,000
7 Eselon IV/Gol.III 360,000 236,000 246,000
8 Gol II/I 360,000 236,000 246,000
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
c. Mobil roda 4 : 930.000/hr
a. Bus Besar : 4.638.000/hr
b. Bus Sedang : 3.282.000/hr
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.222.000/hr
b. Bus Sedang : 2.446.000/hr
c. Mobil roda 4 : 966.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
7
1. Biaya tiket sesuai
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.666.000/hr
b. Bus Sedang : 2.512.000/hr
c. Mobil roda 4 : 777.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.403.000/hr
b. Bus Sedang : 2.563.000/hr
c. Mobil roda 4 : 932.000/hr
dalam SHBJ
2. Biaya sewa kendaraan di
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
tempat keberangkatan :
a. Bus Besar : 3.780.000/hr
b. Bus Sedang : 2.625.000/hr
c. Mobil roda 4 : 1.500.000/hr
83
7. SUMATERA UTARA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 464,000
2 Pimpinan DPRD 370,000 236,000 464,000
3 Anggota DPRD 370,000 236,000 464,000
4 Sekda 370,000 236,000 464,000
5 Eselon II 370,000 236,000 464,000
6 Eselon III/Gol.IV 370,000 236,000 464,000
7 Eselon IV/Gol.III 370,000 236,000 464,000
8 Gol II/I 370,000 236,000 464,000
8.
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 188,000
2 Pimpinan DPRD 370,000 236,000 188,000
3 Anggota DPRD 370,000 236,000 188,000
4 Sekda 370,000 236,000 188,000
5 Eselon II 370,000 236,000 188,000
6 Eselon III/Gol.IV 370,000 236,000 188,000
7 Eselon IV/Gol.III 370,000 236,000 188,000
8 Gol II/I 370,000 236,000 188,000
9. KEPULAUAN RIAU
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 274,000
2 Pimpinan DPRD 370,000 236,000 274,000
3 Anggota DPRD 370,000 236,000 274,000
4 Sekda 370,000 236,000 274,000
5 Eselon II 370,000 236,000 274,000
6 Eselon III/Gol.IV 370,000 236,000 274,000
7 Eselon IV/Gol.III 370,000 236,000 274,000
8 Gol II/I 370,000 236,000 274,000
10. JAMBI
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 294,000
2 Pimpinan DPRD 370,000 236,000 294,000
3 Anggota DPRD 370,000 236,000 294,000
4 Sekda 370,000 236,000 294,000
5 Eselon II 370,000 236,000 294,000
6 Eselon III/Gol.IV 370,000 236,000 294,000
7 Eselon IV/Gol.III 370,000 236,000 294,000
8 Gol II/I 370,000 236,000 294,000
11. SUMATERA BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 380,000
2 Pimpinan DPRD 380,000 236,000 380,000
3 Anggota DPRD 380,000 236,000 380,000
4 Sekda 380,000 236,000 380,000
5 Eselon II 380,000 236,000 380,000
6 Eselon III/Gol.IV 380,000 236,000 380,000
7 Eselon IV/Gol.III 380,000 236,000 380,000
8 Gol II/I 380,000 236,000 380,000
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
7
1. Biaya tiket sesuai
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
kota tujuan :
a. Bus Besar : 3.910.000/hr
b. Bus Sedang : 2.373.000/hr
c. Mobil roda 4 : 901.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi
Biaya Transportasi
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.203.000/hr
b. Bus Sedang : 2.139.000/hr
c. Mobil roda 4 : 975.000/hr
RIAU
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
Penginapan(Orang/Kali)
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJa. Bus Besar : 3.908.000/hr
b. Bus Sedang : 2.606.000/hr
c. Mobil roda 4 : 978.000/hr
2. Biaya sewa kendaraan di
kota tujuan :
2 7
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
(Orang/Kali)
2
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.601.000/hr
b. Bus Sedang : 3.810.000/hr
c. Mobil roda 4 : 804.000/hr
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
c. Mobil roda 4 : 783.000/hr
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.409.000/hr
b. Bus Sedang : 2.124.000/hr
84
12. SUMATERA SELATAN
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 256,000
2 Pimpinan DPRD 380,000 236,000 256,000
3 Anggota DPRD 380,000 236,000 256,000
4 Sekda 380,000 236,000 256,000
5 Eselon II 380,000 236,000 256,000
6 Eselon III/Gol.IV 380,000 236,000 256,000
7 Eselon IV/Gol.III 380,000 236,000 256,000
8 Gol II/I 380,000 236,000 256,000
13. LAMPUNG
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 334,000
2 Pimpinan DPRD 380,000 236,000 334,000
3 Anggota DPRD 380,000 236,000 334,000
4 Sekda 380,000 236,000 334,000
5 Eselon II 380,000 236,000 334,000
6 Eselon III/Gol.IV 380,000 236,000 334,000
7 Eselon IV/Gol.III 380,000 236,000 334,000
8 Gol II/I 380,000 236,000 334,000
14. BENGKULU
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 218,000
2 Pimpinan DPRD 380,000 236,000 218,000
3 Anggota DPRD 380,000 236,000 218,000
4 Sekda 380,000 236,000 218,000
5 Eselon II 380,000 236,000 218,000
6 Eselon III/Gol.IV 380,000 236,000 218,000
7 Eselon IV/Gol.III 380,000 236,000 218,000
8 Gol II/I 380,000 236,000 218,000
15. BANGKA BELITUNG
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 410,000 236,000 180,000
2 Pimpinan DPRD 410,000 236,000 180,000
3 Anggota DPRD 410,000 236,000 180,000
4 Sekda 410,000 236,000 180,000
5 Eselon II 410,000 236,000 180,000
6 Eselon III/Gol.IV 410,000 236,000 180,000
7 Eselon IV/Gol.III 410,000 236,000 180,000
8 Gol II/I 410,000 236,000 180,000
16. BALI
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 480,000 236,000 318,000
2 Pimpinan DPRD 480,000 236,000 318,000
3 Anggota DPRD 480,000 236,000 318,000
4 Sekda 480,000 236,000 318,000
5 Eselon II 480,000 236,000 318,000
6 Eselon III/Gol.IV 480,000 236,000 318,000
7 Eselon IV/Gol.III 480,000 236,000 318,000
8 Gol II/I 480,000 236,000 318,000
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.273.000/hr
b. Bus Sedang : 2.781.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
2 7
2
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 5.052.000/hr
b. Bus Sedang : 3.594.000/hr
c. Mobil roda 4 : 846.000/hr
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
c. Mobil roda 4 : 777.000/hr
a. Bus Besar : 5.159.000/hr
b. Bus Sedang : 3.810.000/hr
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
7
1. Biaya tiket sesuai
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.097.000/hr
b. Bus Sedang : 2.200.000/hr
c. Mobil roda 4 : 1.212.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
No
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.536.000/hr
b. Bus Sedang : 2.658.000/hr
c. Mobil roda 4 : 925.000/hr
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
c. Mobil roda 4 : 1.258.000/hr
85
17. NUSA TENGGARA BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 440,000 236,000 462,000
2 Pimpinan DPRD 440,000 236,000 462,000
3 Anggota DPRD 440,000 236,000 462,000
4 Sekda 440,000 236,000 462,000
5 Eselon II 440,000 236,000 462,000
6 Eselon III/Gol.IV 440,000 236,000 462,000
7 Eselon IV/Gol.III 440,000 236,000 462,000
8 Gol II/I 440,000 236,000 462,000
18. NUSA TENGGARA TIMUR
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 216,000
2 Pimpinan DPRD 430,000 236,000 216,000
3 Anggota DPRD 430,000 236,000 216,000
4 Sekda 430,000 236,000 216,000
5 Eselon II 430,000 236,000 216,000
6 Eselon III/Gol.IV 430,000 236,000 216,000
7 Eselon IV/Gol.III 430,000 236,000 216,000
8 Gol II/I 430,000 236,000 216,000
19. KALIMANTAN BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 270,000
2 Pimpinan DPRD 380,000 236,000 270,000
3 Anggota DPRD 380,000 236,000 270,000
4 Sekda 380,000 236,000 270,000
5 Eselon II 380,000 236,000 270,000
6 Eselon III/Gol.IV 380,000 236,000 270,000
7 Eselon IV/Gol.III 380,000 236,000 270,000
8 Gol II/I 380,000 236,000 270,000
20. KALIMANTAN TENGAH
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 360,000 236,000 222,000
2 Pimpinan DPRD 360,000 236,000 222,000
3 Anggota DPRD 360,000 236,000 222,000
4 Sekda 360,000 236,000 222,000
5 Eselon II 360,000 236,000 222,000
6 Eselon III/Gol.IV 360,000 236,000 222,000
7 Eselon IV/Gol.III 360,000 236,000 222,000
8 Gol II/I 360,000 236,000 222,000
21. KALIMANTAN SELATAN
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 300,000
2 Pimpinan DPRD 380,000 236,000 300,000
3 Anggota DPRD 380,000 236,000 300,000
4 Sekda 380,000 236,000 300,000
5 Eselon II 380,000 236,000 300,000
6 Eselon III/Gol.IV 380,000 236,000 300,000
7 Eselon IV/Gol.III 380,000 236,000 300,000
8 Gol II/I 380,000 236,000 300,000
(Orang/Kali)
c. Mobil roda 4 : 1.177.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
a. Bus Besar : 3.452.000/hr
b. Bus Sedang : 2.630.000/hr
c. Mobil roda 4 : 778.000/hr
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
2. Biaya sewa kendaraan di
kota tujuan :
2 7
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJSesuai
dengan
standar
perjalanan
dinas dalam
SHBJa. Bus Besar : 5.573.000/hr
b. Bus Sedang : 3.716.000/hr
c. Mobil roda 4 : 882.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
Biaya Transportasi
c. Mobil roda 4 : 857.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
Penginapan(Orang/Kali)
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.468.000/hr
b. Bus Sedang : 2.548.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.644.000/hr
b. Bus Sedang : 2.611.000/hr
c. Mobil roda 4 : 868.000/hr
kota tujuan :
a. Bus Besar : 3.369.000/hr
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ b. Bus Sedang : 2.532.000/hr
86
22. KALIMANTAN TIMUR
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 900,000
2 Pimpinan DPRD 430,000 236,000 900,000
3 Anggota DPRD 430,000 236,000 900,000
4 Sekda 430,000 236,000 900,000
5 Eselon II 430,000 236,000 900,000
6 Eselon III/Gol.IV 430,000 236,000 900,000
7 Eselon IV/Gol.III 430,000 236,000 900,000
8 Gol II/I 430,000 236,000 900,000
23. KALIMANTAN UTARA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 204,000
2 Pimpinan DPRD 430,000 236,000 204,000
3 Anggota DPRD 430,000 236,000 204,000
4 Sekda 430,000 236,000 204,000
5 Eselon II 430,000 236,000 204,000
6 Eselon III/Gol.IV 430,000 236,000 204,000
7 Eselon IV/Gol.III 430,000 236,000 204,000
8 Gol II/I 430,000 236,000 204,000
24. SULAWESI UTARA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 276,000
2 Pimpinan DPRD 370,000 236,000 276,000
3 Anggota DPRD 370,000 236,000 276,000
4 Sekda 370,000 236,000 276,000
5 Eselon II 370,000 236,000 276,000
6 Eselon III/Gol.IV 370,000 236,000 276,000
7 Eselon IV/Gol.III 370,000 236,000 276,000
8 Gol II/I 370,000 236,000 276,000
25. GORONTALO
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 480,000
2 Pimpinan DPRD 370,000 236,000 480,000
3 Anggota DPRD 370,000 236,000 480,000
4 Sekda 370,000 236,000 480,000
5 Eselon II 370,000 236,000 480,000
6 Eselon III/Gol.IV 370,000 236,000 480,000
7 Eselon IV/Gol.III 370,000 236,000 480,000
8 Gol II/I 370,000 236,000 480,000
26. SULAWESI BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 410,000 236,000 626,000
2 Pimpinan DPRD 410,000 236,000 626,000
3 Anggota DPRD 410,000 236,000 626,000
4 Sekda 410,000 236,000 626,000
5 Eselon II 410,000 236,000 626,000
6 Eselon III/Gol.IV 410,000 236,000 626,000
7 Eselon IV/Gol.III 410,000 236,000 626,000
8 Gol II/I 410,000 236,000 626,000
c. Mobil roda 4 : 1.100.000/hr
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
Biaya Transportasi(Orang/Kali)
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.230.000/hr
b. Bus Sedang : 2.086.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
Biaya Transportasi(Orang/Kali)
2 7
1. Biaya tiket sesuai
standar perjalanan dinas
72
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.863.000/hr
b. Bus Sedang : 2.713.000/hr
c. Mobil roda 4 : 1.100.000/hr
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.863.000/hr
b. Bus Sedang : 2.750.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
Penginapan
b. Bus Sedang : 2.205.000/hr
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.722.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
c. Mobil roda 4 : 792.000/hr
c. Mobil roda 4 : 956.000/hr
kota tujuan :
a. Bus Besar : 3.282.000/hr
b. Bus Sedang : 2.464.000/hr
c. Mobil roda 4 : 772.000/hr
7
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
Penginapan
87
27. SULAWESI SELATAN
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 290,000
2 Pimpinan DPRD 430,000 236,000 290,000
3 Anggota DPRD 430,000 236,000 290,000
4 Sekda 430,000 236,000 290,000
5 Eselon II 430,000 236,000 290,000
6 Eselon III/Gol.IV 430,000 236,000 290,000
7 Eselon IV/Gol.III 430,000 236,000 290,000
8 Gol II/I 430,000 236,000 290,000
28. SULAWESI TENGAH
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 370,000 236,000 330,000
2 Pimpinan DPRD 370,000 236,000 330,000
3 Anggota DPRD 370,000 236,000 330,000
4 Sekda 370,000 236,000 330,000
5 Eselon II 370,000 236,000 330,000
6 Eselon III/Gol.IV 370,000 236,000 330,000
7 Eselon IV/Gol.III 370,000 236,000 330,000
8 Gol II/I 370,000 236,000 330,000
29. SULAWESI TENGGARA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 342,000
2 Pimpinan DPRD 380,000 236,000 342,000
3 Anggota DPRD 380,000 236,000 342,000
4 Sekda 380,000 236,000 342,000
5 Eselon II 380,000 236,000 342,000
6 Eselon III/Gol.IV 380,000 236,000 342,000
7 Eselon IV/Gol.III 380,000 236,000 342,000
8 Gol II/I 380,000 236,000 342,000
30. MALUKU
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 380,000 236,000 480,000
2 Pimpinan DPRD 380,000 236,000 480,000
3 Anggota DPRD 380,000 236,000 480,000
4 Sekda 380,000 236,000 480,000
5 Eselon II 380,000 236,000 480,000
6 Eselon III/Gol.IV 380,000 236,000 480,000
7 Eselon IV/Gol.III 380,000 236,000 480,000
8 Gol II/I 380,000 236,000 480,000
31. MALUKU UTARA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 430,000 236,000 430,000
2 Pimpinan DPRD 430,000 236,000 430,000
3 Anggota DPRD 430,000 236,000 430,000
4 Sekda 430,000 236,000 430,000
5 Eselon II 430,000 236,000 430,000
6 Eselon III/Gol.IV 430,000 236,000 430,000
7 Eselon IV/Gol.III 430,000 236,000 430,000
8 Gol II/I 430,000 236,000 430,000
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
c. Mobil roda 4 : 965.000/hr
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.170.000/hr
b. Bus Sedang : 3.013.000/hr
2 7
Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2 7
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
standar perjalanan dinas
dalam SHBJ
7
1. Biaya tiket sesuai
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.021.000/hr
b. Bus Sedang : 2.872.000/hr
c. Mobil roda 4 : 947.000/hr
2. Biaya sewa kendaraan di
kota tujuan :
2 7
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJSesuai
dengan
standar
perjalanan
dinas dalam
SHBJa. Bus Besar : 3.434.000/hr
b. Bus Sedang : 2.708.000/hr
c. Mobil roda 4 : 796.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
Penginapan(Orang/Kali) Biaya Transportasi
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.433.000/hr
b. Bus Sedang : 2.609.000/hr
c. Mobil roda 4 : 839.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 3.369.000/hr
b. Bus Sedang : 2.422.000/hr
c. Mobil roda 4 : 824.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)
88
32. PAPUA
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 580,000 236,000 862,000
2 Pimpinan DPRD 580,000 236,000 862,000
3 Anggota DPRD 580,000 236,000 862,000
4 Sekda 580,000 236,000 862,000
5 Eselon II 580,000 236,000 862,000
6 Eselon III/Gol.IV 580,000 236,000 862,000
7 Eselon IV/Gol.III 580,000 236,000 862,000
8 Gol II/I 580,000 236,000 862,000
33. PAPUA BARAT
(Orang/Hari) Kedudukan Tujuan
1 3 4 5 6
1 Bupati/Wakil Bupati 480,000 236,000 364,000
2 Pimpinan DPRD 480,000 236,000 364,000
3 Anggota DPRD 480,000 236,000 364,000
4 Sekda 480,000 236,000 364,000
5 Eselon II 480,000 236,000 364,000
6 Eselon III/Gol.IV 480,000 236,000 364,000
7 Eselon IV/Gol.III 480,000 236,000 364,000
8 Gol II/I 480,000 236,000 364,000
34. DIY
1
1 BUPATI / WAKIL BUPATI 250,000 420,000
2 DPRD 250,000 420,000
3 ESELON II 200,000 420,000
4 ESELON III - 420,000
5 ESELON IV - 420,000
6 GOLONGAN IV - 420,000
7 GOLONGAN III - 420,000
8 GOLONGAN II/I - 420,000
Keterangan :
1.
2.
3.
4.
5.
6.
I. BIAYA PUBLIKASI
NO
1
I. SIARAN RADIO
1 Siaran dengan teks dibaca 50,000 1 kali siaran
2 Siaran dengan SPOT 80,000 1 kali siaran
3 Biaya rekaman SPOT 250,000 1 kali siaran
4 Siaran Langsung/talk show 1,500,000 1 kali siaran (1 jam)
Uang Representasi dan Uang Harian dapat diberikan untuk kegiatan Kunjungan Kerja/Studi Banding yang dilaksanakan
lebih dari 8 (delapan) jam.
Kegiatan kunjungan kerja/studi banding dan sejenisnya dilaksanakan secara berombongan baik secara swakelola
maupun menggunakan jasa Event Organizer (EO) atau yang lainnya. Apabila menggunakan jasa Event Organizer (EO)
atau yang lainnya, maka rekening kegiatan disesuaikan dengan peruntukannya dan dapat diberikan fee Event Organizer
(EO) sebesar 10%.
Sewa Kendaraan sudah termasuk bahan bakar dan pengemudi serta dibayarkan sesuai dengan pengeluaran riil.
Uang Representasi diberikan kepada Bupati/Wabup, Pimpinan/Anggota DPRD dan Pejabat Eselon II sesuai standar
perjalanan dinas dalam SHBJ.
Kegiatan kunjungan kerja/studi banding luar daerah propinsi dengan dua tempat tujuan lokus atau lebih dan
pelaksanaan kegiatan dilaksanakan dalam satu atau dua hari, dapat diberikan uang perjalanan dinas maksimal 3 (tiga)
hari.
Biaya kunjungan kerja/studi banding untuk tujuan dalam Pulau Jawa paling lama 3 (tiga) hari dan Luar Pulau Jawa
paling lama 4 (empat) hari.
2 7
2
URAIAN BESARAN (Rp.) KETERANGAN
2 3 4
3 4
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 5.248.000/hr
b. Bus Sedang : 4.082.000/hr
c. Mobil roda 4 : 1.107.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
2
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
standar perjalanan dinas
Sesuai
dengan
standar
perjalanan
dinas dalam
SHBJ
1. Biaya tiket sesuai
standar perjalanan dinas
dalam SHBJ
7
1. Biaya tiket sesuai
(Orang/Hari)
NO PELAKSANA
UANG REPRESENTASI UANG HARIAN
(≥ 8 Jam) (≥ 8 Jam)
(Orang/Hari)
dalam SHBJ
2. Biaya sewa kendaraan di
kota tujuan :
a. Bus Besar : 4.547.000/hr
b. Bus Sedang : 3.499.000/hr
c. Mobil roda 4 : 1.059.000/hr
No PelaksanaUang Harian
Biaya Taksi (PP)Biaya
PenginapanBiaya Transportasi(Orang/Kali)
89
J. BIAYA PENGURUSAN TANAH UNTUK KEPENTINGAN PEMERINTAH
NO SATUAN
1 3
1 Transport Petugas Ukur Tanah org/bidang
2 Transport Petunjuk Batas Tanah org/bidang
3 Penelitian dan Pengumpulan Formulir berkas
bidang
4 Biaya Pemberkasan Pendaftaran Tanah bidang
Keterangan :
Biaya pengurusan tanah hanya dapat dianggarkan pada Dinas Pertanahan dan Tata Ruang
K. SEWA
1. Sewa Kendaraan
1 3 5
1 Bus Kapasitas 30 tempat duduk : Bus Executive
a. Diluar Jateng/DIY per hari 2,940,000
b. Jawa Tengah per hari 2,625,000
c. DIY per hari 2,150,000
2 Bus Kapasitas 50 Tempat duduk : Bus Executive
a. Diluar Jateng/DIY per hari 4,150,000
b. Jawa Tengah per hari 3,780,000
c. DIY per hari 3,700,000
3 Minibus/Microbus : Model Charter
a. Minibus (Xenia, Avansa, APV dan Sejenis) 12 Jam 900,000 Hari biasa
b. Minibus (Xenia, Avansa, APV dan Sejenis) 24 Jam 1,500,000 Hari biasa
c. Microbus (Elf, Dyna, Rino & sejenis). 12 Jam 1,650,000 Hari biasa
d Microbus (Elf, Dyna, Rino & sejenis). 24 Jam 2,000,000 Hari biasa
a. Minibus (Xenia, Avansa, APV dan Sejenis) 12 Jam 1,120,000 Hari Raya
b. Minibus (Xenia, Avansa, APV dan Sejenis) 24 Jam 1,900,000 Hari Raya
c. Microbus (Elf, Dyna, Rino & sejenis). 12 Jam 2,020,000 Hari Raya
d. Microbus (Elf, Dyna, Rino & sejenis). 24 Jam 2,460,000 Hari Raya
4 Sewa Angkutan (Truck ) :
a. DKI kali 4,700,000 Kali/perjalanan
b. Banten/Tangerang kali 5,330,000 Kali/perjalanan
c. Jawa Barat kali 3,450,000 Kali/perjalanan
d. Jawa Tengah kali 2,660,000 Kali/perjalanan
e. Jawa Timur kali 4,100,000 Kali/perjalanan
f. DIY kali 1,450,000 Kali/perjalanan
g. Wilayah Kulon Progo kali 850,000 Kali/perjalanan
2 Sewa Alat-alat Pertemuan/Pesta
1 3 4 5
1 TENDA
a. Tenda biasa/seng dengan rumbai m2
9,000
b. Tenda seng rumbai VIP m2
12,000
c. Tenda Plafon datar m2
18,000
d. Tenda VIP Plafon datar m2
24,000
e. Tenda VIP Vista m2
44,400
f. Tenda VIP Serut datar m2
27,750
g. Tenda Dravery / sentris m2
33,500
h. Dinding serut m2
12,000
i. Tenda Sarnavile unit 500,000
2 MEJA DAN KURSI
a. Meja Roundtabel unit 66,600
b. Meja Reseptionis unit 50,000
c. Meja Prasmanan unit 75,000
d. Meja VIP unit 42,500
e. Meja + Taplak unit 8,500
f. Kursi VIP + Cover unit 14,500
g. Kursi VIP tanpa cover unit 8,500
h. Kursi Lipat tanpa Cover unit 3,500
i. Kursi Lipat degan Cover unit 10,000
pendaftaran sertifikat 50,000
2
Keterangan(sudah termasuk PPN/PPh)
2 4
NO URAIAN SATUANHarga
KETERANGAN(sudah termasuk PPN/PPh)
250,000
NO URAIAN SatuanHarga
URAIAN BESARAN (Rp.)
2 4
75,000
50,000
90
1 3 4 5
3 PANGGUNG
a. Panggung m2
44,500
b. Flooring m2
25,000
c. Panggung full rigging L. 120 set 7,950,000 per hari
d. Panggung full rigging L 80 set 5,300,000 per hari
e. Panggung full rigging L 48 set 3,600,000 per hari
f. Panggung tanpa atap m2
36,000 per hari
4 ALAT PENDINGIN
a. Blower unit 360,000
b. AC 5 PK unit 1,500,000 per 8 jam
c. AC 3 PK unit 1,000,000 per 8 jam
d. AC Portable 1 PK unit 360,000 per 8 jam
e. Kipas blower air unit 360,000 per 8 jam
5 TATA SUARA DAN LAMPU
a. Sound system 20 rb watt set 6,660,000 per 8 jam
b. Sound system 15 rb watt set 4,995,000 per 8 jam
c. Sound system 10 rb watt set 3,330,000 per 8 jam
d. Sound system 5 rb watt set 1,665,000 per 8 jam
e. Sound system 3 rb watt set 999,000 per 8 jam
f. Lighting parled unit 180,000 per 8 jam
g. Lighting moving Beam unit 600,000 per 8 jam
h. Lampu penerangan unit 17,000 per 8 jam
i. Genset 16 KVA unit 3,000,000 per 8 jam
j. Genset 45 KVA unit 4,500,000 per 8 jam
k. Genset silet 50 KVA unit 3,500,000 per 8 jam
l. Genset silet 30 KVA unit 2,000,000 per 8 jam
m. Genset silet 15 KVA unit 1,500,000 per 8 jam
n. Genset silet 10 KVA unit 1,250,000 per 8 jam
o. Genset silet 5 KVA unit 620,000 per 8 jam
6 LAIN-LAIN
a. Taman set minimalis set 500,000 per meter
b. Backdrop m2 60,000
c. Dekorasi minimalis m 1,390,000
L. KEGIATAN LAIN-LAIN
NO
1
I Gaji/Upah :
1 350,000 /org hari
2 Juru Bahasa/Penterjemah lainnya 250,000 /org hari
3 Narasumber ahli pendamping jama'ah haji 700,000 /org hari
4 Pemandu wisata 450,000 /org hari Berlisensi
II Lain-lain :
1 Pengetikan Bahasa Indonesia 2,500 /lembar
2 Pengetikan Bahasa Asing 3,300 /lembar
3 Penulisan Kertas Kerja 7,500 /lembar
4 Terjemahan Naskah Bahasa Asing 75,000 /lembar
5 Terjemahan Naskah Bahasa Daerah 50,000 /lembar
6 Pembawa acara/ MC 85,000 /org kali lokal
7 Rokhaniwan 150,000 /org kali
8 Pembaca doa 150,000 /org kali
9 Saksi Pelantikan 300,000 /org kali
Juru Bahasa/Penterjemah : Bupati, Wakil Bupati, Pimpinan
DPRD dan Sekda
URAIAN BESARAN (Rp.) KETERANGAN
2 3 5
NO URAIAN SATUANHarga
KETERANGAN(sudah termasuk PPN/PPh)
2
91
M.BIAYA PERAWATAN GEDUNG
NO SAT
1 3
1 Lantai : Termasuk bahan
a. Abu-abu m2
b. Teraso m2
c. Keramik m2
d. Karpet m2
2 Dinding m2
3 Kaca m2
4 Kamar Mandi/ WC Kamar
5 Telepon buah
6 Taman m2
7 Halaman m2
N. JASA PELAKU SENI, BUDAYA, IPTEK DAN OLAH RAGA
1 Seniman dalam Pagelaran dan Misi Kesenian
1 3 4 5
1 Sutradara 600,000 900,000 1,500,000
2 Stage Manager 550,000 850,000 1,300,000
3 Penata Tari 500,000 800,000 1,250,000
4 Penata Iringan 500,000 700,000 1,200,000
5 Penata Artistik 500,000 700,000 1,200,000
6 Penata Busana 500,000 700,000 1,000,000
7 Penata Rias 500,000 700,000 1,000,000
8 Waranggana 410,000 600,000 900,000
9 Pengrebab 350,000 500,000 850,000
10 Pengendang 410,000 600,000 900,000
11 Penggender 350,000 500,000 850,000
12 Penari 400,000 650,000 950,000
13 Pengrawit 400,000 650,000 950,000
14 Crew panggung 250,000 400,000 600,000
15 Official 400,000 650,000 950,000
2 Pelaksana Kegiatan Lomba
NOTINGKAT
LOKAL (Rp.)
TINGKAT
NASIONAL
(Rp)
1 4 5
1 Juri Lomba Kesenian 750,000 2,250,000
2 Juri Lomba Foto 300,000 900,000
3 Juri Lomba Lukis/Menggambar/Mewarnai 300,000 900,000
4 Juri Lomba Olah Raga
1 Wasit/juri/penilai 300,000 900,000
2 Dewan hakim/pembantu juri 200,000 600,000
3 Petugas lapangan 150,000 450,000
4 Sekretaris pertandingan/pengawas 200,000 600,000
5 Juri Lomba Desa Wisata 300,000 900,000
6 Juri Lomba IPTEK 750,000 2,250,000
O. HADIAH DAN PENGHARGAAN
1. Hadiah Lomba dan Kompetisi
Kelompok Perorangan Kelompok Perorangan
1 3 4 5 6
1 Juara I 5,000,000 3,000,000 2,500,000 1,250,000
2 Juara II 4,000,000 2,500,000 2,000,000 1,000,000
3 Juara III 3,000,000 2,000,000 1,500,000 750,000
4 Harapan I 2,500,000 1,500,000 1,250,000 500,000
5 Harapan II 2,000,000 1,250,000 1,000,000 400,000
6 Harapan III 1,500,000 1,000,000 750,000 300,000
2
orang hari
orang hari
orang hari
orang hari
NO URAIANTINGKAT KABUPATEN TINGKAT KECAMATAN
orang hari
orang hari
orang hari
orang hari
orang hari
Untuk sekali produksi
URAIAN SATUAN
2 3
DI LUAR
NEGERI
KETERANGAN
2 6
700
17,500
3,000
4,500
650
NO PROFESI DI DIY DI LUAR DIY
1,500
1,500
1,500
2,000
650
JENIS HARGA/ BULAN (Rp.) KETERANGAN
2 4 5
92
2. Hadiah Lomba IPTEK
Kelompok Perorangan
1 3 4
1 Juara I 6,000,000 4,000,000
2 Juara II 5,000,000 3,000,000
3 Juara III 4,000,000 2,000,000
4 Harapan I 3,000,000 1,500,000
5 Harapan II 2,000,000 1,250,000
6 Harapan III 1,500,000 1,000,000
3. Penghargaan / Reward
Kelompok Perorangan Kelompok Perorangan
1 3 4 5 6
1 Juara I 7,500,000 5,000,000 6,000,000 4,000,000
2 Juara II 6,500,000 4,000,000 5,000,000 3,000,000
3 Juara III 5,500,000 3,000,000 4,000,000 2,500,000
P. BIAYA DROPING AIR
NO SATUAN BIAYA KET
1 3 4
1 Daerah mudah per tanki 225,000 5000 lt
2 Daerah sedang per tanki 250,000 5000 lt
3 Daerah sulit per tanki 300,000 5000 lt
Biaya droping air digunakan dalam rangka pengiriman/penyaluran air akibat kekeringan.
a. Daerah mudah : tidak melewati jalan dengan kemiringan 12° atau lebih.
b. Daerah sedang : melewati jalan dengan kemiringan 12° s/d 20°.
c. Daerah sulit : melewati jalan dengan kemiringan lebih dari 20°.
Q.
Dapat diatur tersendiri dengan Peraturan Pimpinan BLUD.
TINGKAT PROVINSI
2
URAIAN
2
STANDARISASI JASA BLUD
NO URAIANTINGKAT KABUPATEN
2
NO URAIANTINGKAT NASIONAL
93
A. HARGA SATUAN KOMPONEN BAHAN BANGUNAN/ KONTRUKSI
1 3 4 5 6
1 Air m3 3,500 4,000 4,000
2 Aluminium Foil roll 440,000 440,000 453,000
3 Amplas lbr 4,500 4,500 4,500
4 Aspal Curah kg 14,700 14,700 15,000
5 Aspal Drum kg 14,700 14,700 15,000
6 Aspal Drum drum 2,215,000 2,215,000 2,215,000
7 Asbes Semen Glb. Kecil :
- 3000x1050x4 mm lb 108,000 108,000 120,000
- 2400x1050x4 mm lb 91,500 91,500 103,000
- 2100x1050x4 mm lb 80,700 80,700 92,500
- 1800x1050x4 mm lb 67,700 67,700 79,500
- 1500x1050x4 mm lb 60,000 60,000 71,800
8 Asbes Semen Glb Besar :
- 3000x1080x5 mm lb 145,000 145,000 147,300
- 2400x1080x5 mm lb 116,500 116,500 121,300
- 2100x1080x5 mm lb 100,000 100,000 112,000
- 1800x1080x5 mm lb 84,800 84,800 88,400
9 Asbes plat :
- 1000x1000x3 mm lb 17,700 17,700 20,000
- 1000x2000x3 mm lb 41,000 41,000 43,500
- 500x2000x3 mm lb 24,700 24,700 27,000
- 250x2000x4 mm lb 17,000 17,000 17,600
- 1200x2400x4 mm lb 71,800 71,800 73,000
- 1000x1000x4 mm lb 23,500 23,500 24,700
- 1200x2400x5 mm lb 107,200 114,300 115,500
- 1200x2400x6 mm lb 135,500 139,000 147,200
10 Asbes Nok :
- Gelombang kecil 4 mm bj 53,000 53,000 55,300
- Gelombang besar 6 mm bj 82,400 82,400 88,400
11 Batu bata aple 4 bj 1,100 1,100 1,400
12 Batu bata aple 5 bj 950 950 1,200
13 Batu belah :
Batu belah 15/20 m3 271,000 271,000 282,800
Batu belah 10/15 m3 271,000 271,000 282,800
Batu belah 7/10 m3 271,000 271,000 282,800
Batu pecah 5/7 m3 282,800 282,800 294,500
Batu pecah 4/6 m3 282,800 282,800 294,500
Batu belah 3/4 m3 294,500 294,500 306,400
Batu belah 2/3 m3 294,500 294,500 306,400
Batu seplit 1/2 m3 294,500 294,500 306,400
Batu seplit 0,5/1 m3 294,500 294,500 306,400
Batu belah putih m3 235,600 235,600 247,500
14 Baja WF kg 20,000 20,000 22,400
15 Besi :
Besi cor kg 17,600 17,600 18,800
Besi beton kg 17,600 17,600 18,800
16 Besi Polos :
Diameter 4 mm panjang 12 m ljr 25,000 25,000 31,800
Diameter 6 mm panjang 12 m ljr 32,900 32,900 35,300
Diameter 8 mm panjang 12 m ljr 53,000 53,000 58,900
Diameter 10 mm panjang 12 m ljr 82,400 82,400 88,300
2
BAB III. KONSTRUKSI
Harga termasuk pajak
NO URAIAN SATUAN
HARGA (Rp)
MUDAH SEDANG SULIT
94
1 3 4 5 6
Diameter 12 mm panjang 12 m ljr 117,800 117,800 129,600
Diameter 16 mm panjang 12 m ljr 241,500 241,500 253,300
Diameter 19 mm panjang 12 m ljr 235,600 235,600 247,400
17 Besi Ulir :
Diameter 6 mm panjang 12 m ljr 32,900 32,900 38,800
Diameter 8 mm panjang 12 m ljr 64,800 64,800 70,700
Diameter 10 mm panjang 12 m ljr 82,500 82,500 88,400
Diameter 13 mm panjang 12 m ljr 147,200 147,200 153,200
Diameter 16 mm panjang 12 m ljr 200,300 200,300 206,200
Diameter 19 mm panjang 12 m ljr 271,000 271,000 276,900
18 Batako :
Batako pejal besar bj 5,100 5,100 5,400
Batako pejal kecil bj 4,100 4,100 4,400
19 Bambu :
Bambu apus ljr 20,000 20,000 20,000
Bambu wulung ljr 21,200 21,200 21,200
Bambu petung ljr 58,900 58,900 64,800
20 Beton Roster/kerawang bh 7,000 7,000 8,200
21 Buis beton :
- Diameter 15 cm x 1 m bj 67,100 67,100 70,700
- Diameter 20 cm x 1 m bj 67,700 67,700 71,900
- Diameter 1/2 Lingk. X 25 cm x 1 m bj 50,000 50,000 53,600
- Diameter 1/2 Lingk. X 20 cm x 1 m bj 44,100 44,100 47,700
- Diameter 25 cm x 1 m bj 74,800 74,800 78,400
- Diameter 30 cm x 1 m bj 85,400 85,400 88,900
- Diameter 40 cm x 1 m bj 103,000 103,000 106,600
- Diameter 60 cm x 0,5 m bj 91,300 91,300 94,800
- Diameter 70 cm x 0,5 m bj 106,000 106,000 109,500
- Diameter 80 cm x 0,5 m bj 117,800 117,800 121,300
- Diameter 100 cm x 0,5 m bj 176,700 176,700 180,200
22 Cat :
Cat kayu Emco kg 73,000 73,000 76,500
Cat kayu Avian kg 76,500 76,500 80,100
Cat kayu Altek kg 69,500 69,500 73,000
Cat meni kg 33,000 33,000 36,500
Cat besi Emco kg 85,400 85,400 88,900
Cat besi Avian kg 76,500 76,500 80,100
Cat tembok Decolit 1 kg 29,500 29,500 32,900
Cat tembok Decolit 5 kg 129,600 129,600 133,100
Cat tembok Catylac 1 kg 29,400 29,400 32,900
Cat tembok Catylac 5 kg 136,700 136,700 140,200
Cat tembok Altek 1 kg 29,400 29,400 32,900
Cat tembok Altek 5 kg 119,000 119,000 122,500
Cat tembok dalam Dulux Ambiance 2,5 lt 259,000 259,000 262,700
Cat tembok dalam Dulux Pentalite 2,5 lt 217,900 217,900 217,900
Cat tembok dalam Dulux Easy Clean 2,5 lt 265,000 265,000 265,000
Cat tembok luar Dulux weathershield Max/ Pro
2,5 lt 366,400 366,400 366,400
Cat tembok luar Dulux weathershield 2,5 lt 318,000 318,000 318,000
Cat tembok luar Mowilex Weathercoat 2,5 lt 315,200 315,200 315,200
Cat tembok dalam Mowilex Emultion 2,5 lt 262,700 262,700 262,700
23 Eternit lbr 26,500 26,500 26,500
24 Fibre glass 3 m lbr 117,800 117,800 123,700
25 Formika 120 x 240 cm lbr 129,600 129,600 135,000
26 Engsel :
Engsel pintu (besar) Bh 35,400 35,400 37,700
Engsel pintu (kecil) Bh 23,500 23,500 25,900
Engsel Jendela (besar) Bh 23,500 23,500 25,900
Engsel Jendela (kecil) Bh 17,600 17,600 20,000
NO URAIAN SATUAN
2
HARGA (Rp)
MUDAH SEDANG SULIT
95
1 3 4 5 6
27 Gebalan rumput m2 81,300 81,300 81,300
28 Bubungan Genteng beton bj 23,500 23,500 23,500
29 Bubungan Genteng tanah liat bj 6,000 6,000 6,000
30 Genteng :
Genteng beton besar bj 13,000 13,000 14,400
Genteng beton kecil bj 7,000 7,000 8,200
Genteng tanah paris Godean bj 2,100 2,100 2,300
Genteng tanah kodok Kebumen bj 3,300 3,300 3,300
Genteng Plenthong bj 2,600 2,600 2,600
Genteng kaca bj 17,700 17,700 18,800
31 Handle bh 5,900 5,900 7,000
32 Hak angin 15 cm bh 11,700 11,700 14,100
33 Ijuk ikat 8,200 8,200 9,400
34 Kaca bening :
- 3 mm m2 94,200 94,200 100,000
- 5 mm m2 117,800 117,900 123,700
35 Kaca buram :
- 3 mm m2 147,200 147,200 159,000
- 5 mm m2 229,000 229,000 241,500
36 Kaca rayband :
- 3 mm m2 100,000 100,000 106,000
- 5 mm m2 123,700 123,700 129,600
37 Kayu :
Kayu bakar m3 176,700 176,700 188,500
lbr 18,800 18,800 20,000
Kayu dolken m3 1,060,000 1,060,000 1,084,000
Kayu Jati :
- Papan m3 23,500,000 23,500,000 23,500,000
- Balok 8/12 m3 21,400,000 21,400,000 21,400,000
- Balok 6/12 m3 21,400,000 21,400,000 21,400,000
- Usuk 5/7 m3 19,300,000 19,300,000 19,300,000
- Usuk 4/6 m3 19,200,000 19,200,000 19,200,000
- Reng 3/4 m3 18,200,000 18,200,000 18,200,000
- Reng 2/3 m3 18,200,000 18,200,000 18,200,000
Kayu Bangkirai :
- Papan m3 18,800,000 18,800,000 19,200,000
- Balok 8/12 m3 18,260,000 18,260,000 18,260,000
- Balok 6/12 m3 18,260,000 18,260,000 18,260,000
- Usuk 5/7 m3 15,300,000 15,300,000 15,300,000
- Usuk 4/6 m3 15,300,000 15,300,000 15,300,000
- Reng 2/3 m3 7,600,000 7,600,000 8,000,000
Kayu kamper :
- Papan m3 12,960,000 12,960,000 13,315,000
- Balok 8/12 m3 11,783,000 11,783,000 12,136,000
- Balok 6/12 m3 11,783,000 11,783,000 12,136,000
- Usuk 5/7 m3 10,605,000 10,605,000 10,958,000
- Usuk 4/6 m3 10,605,000 10,605,000 10,958,000
- Reng 2/3 m3 5,891,000 5,891,000 6,245,000
Kayu Kruwing :
- Papan m3 11,783,000 11,783,000 12,136,000
- Balok 8/12 m3 10,015,000 10,015,000 10,369,000
- Balok 6/12 m3 10,015,000 10,015,000 10,369,000
- Usuk 5/7 m3 9,426,000 9,426,000 9,780,000
NO
Kayu bekesting/papan 2/20 panjang 2 m
MUDAH SEDANG SULIT
HARGA (Rp)
2
URAIAN SATUAN
96
1 3 4 5 6
- Usuk 4/6 m3 9,426,000 9,426,000 9,780,000
- Reng 2/3 m3 5,302,000 5,302,000 5,656,000
Kayu Glugu m3 5,891,000 5,891,000 6,245,000
38 Papan kayu meranti m3 9,426,000 9,426,000 9,780,000
39 Usuk 5/7 Kayu Glugu panjang 3 m btg 61,200 61,200 61,200
40 Kapur pasang zak 12,900 12,900 14,100
41 Kawat :
Kawat ayakan m2 29,400 29,400 31,800
Kawat beton/bendrat kg 23,500 23,500 25,900
Kawat nyamuk m2 29,400 29,400 29,400
Kawat ayam PVC panjang 1 m m' 29,400 29,400 29,400
42 Krikil beton m3 300,000 300,000 306,000
43 Krokos/kroco 2-4 cm m3 288,000 288,000 294,500
44 Kunci / slot tanam :
Kunci / slot tanam besar ( Tanaya ) bj 176,700 176,700 200,000
Kunci / slot tanam besar ( Yale ) bj 291,000 291,000 302,000
Kunci / slot tanam besar ( Kuda ) bj 100,000 100,000 106,000
Kunci / slot tanam kecil ( Tanaya ) bj 111,900 111,900 123,700
Kunci / slot tanam kecil ( Yale ) bj 212,100 212,100 223,800
Kunci / slot tanam kecil ( Kuda ) bj 88,300 88,300 94,300
45 Kloset duduk lengkap ( KIA ) standar bj 2,120,000 2,120,000 2,145,000
Kloset duduk lengkap ( INA ) standar bj 1,708,000 1,708,000 1,732,000
Kloset jongkok porselin ( KIA ) bj 324,000 324,000 347,600
Kloset jongkok porselin ( INA ) bj 176,700 176,700 200,000
Kloset jongkok LOLO bj 159,000 159,000 182,600
46 Knip/ Grendel bh 20,000 20,000 22,300
47 Kuas bj 13,000 13,000 15,000
48 Lem aica aibon kg 88,300 88,300 91,900
49 Melamin kg 147,000 147,000 153,000
50 Minyak cat/thiner ltr 23,500 23,500 25,900
51 Pasir :
pasir beton m3 294,000 294,000 353,000
pasir pasang Krasak m3 294,000 294,000 353,000
pasir urug m3 235,600 235,600 294,000
52 Paku :
Paku besar kg 23,500 23,500 25,900
Paku sedang kg 23,500 23,500 25,900
Paku kecil kg 29,400 29,400 31,800
Paku eternit kg 47,000 47,000 49,400
Paku payung kg 53,000 53,000 55,300
53 Pipa :
Galvanis diameter 0,5" panjang 6 m ljr 82,500 82,500 112,000
Galvanis diameter 0,75 " panjang 6 m ljr 112,000 112,000 142,000
Galvanis diameter 1 " panjang 6 m ljr 130,000 130,000 160,000
Galvanis diameter 1,25" panjang 6 m ljr 195,000 195,000 223,800
Galvanis diameter 1,5" panjang 6 m ljr 206,200 206,200 235,600
Galvanis diameter 2" panjang 6 m ljr 235,600 235,600 265,000
Galvanis diameter 3 " panjang 6 m ljr 471,300 471,300 500,000
Galvanis diameter 4 " panjang 6 m ljr 530,000 530,000 559,000
PVC AW diameter 0,5" (WAVIN/ RUCIKA) panjang 4
m ljr26,500 26,500 29,400
PVC AW diameter 0,75" (WAVIN/ RUCIKA) panjang
4 m ljr35,300 35,300 38,300
PVC AW diameter 1" (WAVIN/ RUCIKA) panjang 4
m ljr47,100 47,100 48,300
PVC AW diameter1,25"(WAVIN/ RUCIKA) panjang 4
m ljr76,500 76,500 71,800
2
NO URAIAN SATUAN
HARGA (Rp)
MUDAH SEDANG SULIT
97
1 3 4 5 6
PVC AW diameter 1,5 "(WAVIN/ RUCIKA) panjang 4
m ljr82,500 82,500 84,800
PVC AW diameter 2"(WAVIN/ RUCIKA) panjang 4 mljr
100,000 100,000 106,000
PVC AW diameter 3"(WAVIN/ RUCIKA) panjang 4 mljr
206,000 206,000 212,100
PVC AW diameter 4"(WAVIN/ RUCIKA) panjang 4 mljr
329,000 329,000 353,000
PVC D diameter1,25"(WAVIN/ RUCIKA)
panjang 4 mljr
44,700 44,700 53,000
PVC D diameter 2"(WAVIN/ RUCIKA) panjang 4
mljr
70,700 70,700 74,200
PVC D diameter 3"(WAVIN/ RUCIKA) panjang 4
mljr
111,900 111,900 117,800
PVC D diameter 4"(WAVIN/ RUCIKA) panjang 4
mljr
176,700 176,700 182,600
54 Paving/ conblock (fc : 14,5 MPa)
- Abu-abu t = 6 cm m2 88,300 88,300 94,200
- Warna t = 6 cm m2 100,000 100,000 106,000
55 Plastik gelombang lbr 35,300 35,300 37,700
56 Plamur kayu kg 32,900 32,900 36,500
57 Plamur tembok kg 21,200 21,200 24,700
58 Plywood :
- 900 x 2100 x 4 mm lbr 64,800 64,800 76,500
- 1200 x 2400 x 4 mm lbr 70,700 70,700 82,500
59 Politur ltr 91,000 91,000 94,200
60 Semen :
- Dynamix / Gresik zak 51,800 52,500 53,500
- Putih zak 106,000 106,000 108,000
- Warna kg 17,700 17,700 20,000
61 Roster :
- Roster kayu bh 47,000 47,000 49,500
- Roster tanah liat bh 6,000 6,000 8,200
62 Seng plat :
- BjLs 30-90 x 180 cm lbr 76,500 76,500 78,900
- BjLs 25-90 x 180 cm lbr 64,800 64,800 67,200
63 Seng gelombang :
- BjLs 30-90 x 180 cm lbr 100,000 100,000 104,000
- BjLs 25-90 x 180 cm lbr 64,809 64,809 67,000
64 Seng talang :
- BjLs 30-60 x 60 cm m 26,500 26,500 30,600
- BjLs 25-60 x 60 cm m 35,300 35,300 38,800
- BjLs 30-75 x 75 cm m 41,200 41,200 44,700
- BjLs 25-75 x 75 cm m 37,700 37,700 41,200
- BjLs 30-90 x 90 cm m 41,200 41,200 44,700
- BjLs 25-90 x 90 cm m 37,700 37,700 41,200
65 Sirlak kg 235,600 235,600 259,000
66 Sirtu m3 294,500 294,500 353,500
67 Sepiritus ltr 14,700 14,700 15,900
68 Tanah urugan pilihan m3 176,700 176,700 235,600
69 Teak Oil ltr 95,400 95,400 100,000
70 Teak Wood :
- Teak wood 90 x 120 cm lbr 163,700 163,700 176,700
- Teak wood 90 x 240 cm lbr 203,800 203,800 212,300
71 Teer ltr 29,400 29,400 31,800
72 Terpentin ltr 29,400 29,400 31,800
73 Penutup Lantai :
- Marmer 40 x 60 cm2 m2 294,500 294,500 318,000
NO URAIAN SATUAN
2
HARGA (Rp)
MUDAH SEDANG SULIT
98
1 3 4 5 6
- Keramik 10 x 20 cm2 (Mulia) m2 64,800 64,800 88,000
- Keramik 20 x 20 cm2 (Mulia) m2 100,000 100,000 111,900
- Keramik 30 x 30 cm2/ polos (Mulia) m2 53,026 53,026 58,917
- Keramik 30 x 30 cm2/ motif (Mulia) m2 58,900 58,900 64,800
- Keramik 20 x 20 cm2 (Roman) m2 129,600 129,600 135,500
- Keramik 30 x 30 cm2 (Roman) m2 135,500 135,500 141,400
- Keramik 40 x 40 cm2 (Roman) m2 135,500 135,500 141,400
- Keramik 50 x 50 cm2 (Roman) m2 176,700 176,700 176,700
- Porselin 11 x 11 cm2 m2 106,000 106,000 117,800
- Teraso 30 x 30 cm2 m2 88,300 88,300 111,200
- Kembang 20 x 20 cm2 m2 112,000 112,000 123,700
- Kembang 30 x 30 cm2 m2 112,000 112,000 123,700
- Warna 20 x 20 cm2 (Mulia) m2 76,500 76,500 82,400
- Warna 30 x 30 cm2 (Mulia) m2 76,500 76,500 82,400
- Abu-abu 20 x 20 cm2 m2 76,500 76,500 82,400
- Abu-abu 30 x 30 cm2 m2 76,500 76,500 82,400
74 Thinner melamin ltr 35,300 35,300 36,500
75 Triplek :
- Triplek 3 mm lbr 64,800 64,800 70,700
- Triplek 9 mm lbr 135,500 135,500 141,400
- Triplek 12 mm lbr 212,000 212,000 217,900
76 Vet kg 47,000 47,000 48,300
77 Vernis ltr 47,000 47,000 48,300
78 Water torn :
- Water torn (Pinguin) kapasitas 250 lt bh 1,000,000 1,000,000 1,030,000
- Water torn (Pinguin) kapasitas 550 lt bh 1,296,000 1,296,000 1,325,000
- Water torn (Pinguin) kapasitas 750 lt bh 1,767,000 1,767,000 1,796,000
- Water torn (Pinguin) kapasitas 1000 lt bh 2,238,000 2,238,000 2,268,000
a. Daerah Mudah : tidak melewati jalan dengan kemiringan 12° atau lebih.
b. Daerah Sedang : melewati jalan dengan kemiringan 12° s/d 20°.
c. Daerah Sulit : melewati jalan dengan kemiringan lebih dari 20°.
Perbedaan daerah mudah, sedang dan sulit didasarkan kepada kemiringan jalan yang dilewati antara
asal barang sampai dengan tempat dimana barang digunakan dengan kriteria sebagai berikut :
NO URAIAN SATUAN
2
HARGA (Rp)
MUDAH SEDANG SULIT
99
B. HARGA SATUAN UPAH TENAGA KERJA
1 3 5 6
1 Kepala Tukang Batu hari 77,500 Jam Kerja = 7 jam/hari
2 Tukang Batu hari 75,000
3 Pembantu Tukang Batu hari 70,000
4 Kepala Tukang Kayu hari 77,500
5 Tukang Kayu hari 75,000
6 Tukang Kayu Halus hari 75,000
7 Pembantu Tukang Kayu hari 70,000
8 Kepala Tukang Besi hari 77,500
9 Tukang Besi hari 75,000
10 Pembantu Tukang Besi hari 70,000
11 Kepala Tukang Cat hari 77,500
12 Tukang Cat hari 75,000
13 Pembantu Tukang Cat hari 70,000
14 Sopir/ Operator hari 75,000
15 Mandor hari 82,500
16 Penyemprot Aspal hari 72,500
17 Kernet hari 70,000
18 Jaga Malam hari 70,000
19 Tenaga hari 70,000
2
NO URAIAN SATUAN UPAH (Rp.) Keterangan
2 7 9 11 12
Pintu ulir Buah 400 mm 400 mm 6 mm 1,600 mm Besi 8,097,000 790,000
Buah 500 mm 500 mm 6 mm 1,600 mm Besi 9,097,000 950,000
Buah 600 mm 600 mm 8 mm 1,600 mm Besi 9,970,000 1,400,000
Buah 700 mm 700 mm 8 mm 1,600 mm Besi 11,000,000 1,700,000
Buah 800 mm 800 mm 8 mm 1,600 mm Besi 13,000,000 2,000,000
Pintu tarik Buah 200 mm 200 mm 6 mm 1,100 mm Besi 1,990,000 300,000
Buah 300 mm 300 mm 6 mm 1,100 mm Besi 2,223,000 350,000
Buah 400 mm 400 mm 6 mm 1,100 mm Besi 2,485,000 400,000
Pintu ulir Buah 800 mm 1,000 mm 60 mm 2,500 mm Besi 26,513,750 2,450,000
dengan Buah 900 mm 1,000 mm 60 mm 2,500 mm Besi 27,387,500 2,600,000
(1 standar) Buah 1,000 mm 1,200 mm 60 mm 2,750 mm Besi 28,552,500 2,770,000
Buah 1,000 mm 1,500 mm 60 mm 2,750 mm Besi 30,882,500 2,950,000
Pintu ulir Buah 1,100 mm 1,750 mm 80 mm 3,000 mm Besi 51,000,000 6,400,000
dengan Buah 1,200 mm 1,800 mm 80 mm 3,000 mm Besi 61,000,000 7,700,000
(2 standar) Buah 1,400 mm 2,000 mm 80 mm 4,000 mm Besi 69,000,000 8,700,000
Buah 1,500 mm 2,500 mm 80 mm 4,000 mm Besi 75,000,000 9,400,000
Keterangan :
Harga-harga belum termasuk biaya pemasangan dan transportasi.
C. HARGA SATUAN PEKERJAAN PINTU AIR
Jenis pintu SatuanDaun pintu
Tinggi gawang Bahan Harga Pemeliharaan KeteranganTinggi Lebar Tebal
Harga-harga belum
termasuk biaya
pemasangan dan
transportasi
1 3 4 5 6
101
D. HARGA SATUAN BANGUNAN GEDUNG NEGARA
Tahun : 2021
Provinsi : Yogyakarta
Kabupaten Kulon Progo
dalam rupiah
TIPE A TIPE B TIPE C, D, E
5,010,000 4,860,000 4,480,000
DEPAN BELAKANG SAMPING
BT;T. 1,5 M T. 3 M T. 2 M
2,180,000 1,950,000 1,900,000
BT;T. 1,5 M T. 3 M T. 2 M
DEPAN BELAKANG SAMPING
1,990,000 1,260,000 1,190,000
1.
a.
b. Bangunan rumah dinas tipe C, D, dan E yang tidak bertingkat;
c. Gedung pelayanan kesehatan : puskesmas;
d. Gedung pendidikan tingkat dasar dan/atau lanjutan dengan jumlah lantau s.d. 2 lantai.
2. Bangunan tidak sederhana
a.
b.
c. Gedung Rumah Sakit klas A, B, C, dan D;
d.
3. Bangunan Khusus
Klasifikasi bangunan khusus adalah bangunan gedung negara yang memiliki penggunaan dan persyaratan
khusus, yang dalam perencanaan dan pelaksanaannya memerlukan penyelesaian/teknologi khusus. Masa
penjaminan kegagalan bangunannya paling singkat 10 (sepuluh) tahun.
Klasifikasi bangunan tidak sederhana adalah bangunan gedung negara dengan karakter tidak sederhana
serta memiliki kompleksitas dan/atau teknologi tidak sederhana. Masa penjaminan kegagalan bangunannya
adalah selama paling singkat 10 (sepuluh) tahun.
Yang termasuk klasifikasi Bangunan Tidak Sederhana, antara lain :
Gedung kantor yang belum ada disain prototipenya, atau gedung kantor dengan luas di atas 500 m2,
atau gedung kantor bertingkat lebih dari 2 lantai.
Bangunan rumah dinas tipe A dan B; atau rumah dinas C, D, dan E yang bertingkat lebih dari 2 lantai,
rumah negara yang berbentuk rumah susun
Gedung pendidikan tinggi universitas/akademi; atau gedung pendidikan dasar/lanjutan bertingkat lebih
dari 2 lantai.
Klasifikasi Bangunan Gedung Negara Berdasarkan Tingkat Kompleksitas meliputi :
Bangunan Sederhana
Klasifikasi bangunan sederhana adalah bangunan gedung negara dengan karakter sederhana serta memiliki
kompleksitas dan teknologi sederhana. Masa penjaminan kegagalan bangunannya adalah selama 10
(sepuluh tahun).
Yang termasuk klasifikasi Bangunan Sederhana, antara lain :
Gedung kantor yang sudah ada disain prototipenya, atau bangunan gedung kantor dengan jumlah lantai
s.d. 2 (dua) lantai dengan luas sampai dengan 500 m2;
PAGAR GEDUNG NEGARA
PAGAR RUMAH NEGARA
GEDUNG NEGARA
TIDAK SEDERHANA SEDERHANA
5,480,000 4,220,000
RUMAH NEGARA
102
Yang termasuk klasifikasi bangunan khusus, antara lain :
a. Istana negara dan rumah jabatan presiden dan wakil presiden;
b. Wisma negara;
c. Gedung instalasi nuklir;
d. Gedung instalasi pertahanan, bangunan Polri dengan penggunaan dan persyaratan khusus;
e. Gedung laboratorium;
f. Gedung terminal udara/laut/darat;
g. Stasiun kereta api;
h. Stadion olah raga;
i. Rumah tahanan;
j. Gudang benda berbahaya;
k. Gedung bersifat minumental; dan
l. Gedung perwakilan negara RI di luar negeri.
103
E. BIAYA PENGELOLAAN ANGGARAN FISIK KONSTRUKSI
1. Prosentase Komponen Biaya Pembangunan Bangunan Gedung Negara Klasifikasi Sederhana
Tabel F1
Biaya
Konstruksi
fisik (jt
rupiah)
s.d.
250
250
s.d.
500
500
s.d.
1000
1.000
s.d
2.500
2.500
s.d
5.000
5.000
s.d
10.000
10.000
s.d
25.000
25.000
s.d
50.000
50.000
s.d
100.000
100.000
s.d
250.000
250.000
s.d
500.000
Komponen
Kegiatan
1
Perencanaan
konstruksi
(dalam %)
8.23
8.23
s.d
6.83
6.83
s.d.
5.63
5.63 s.d
4.65
4.65
s.d.
3.90
3.90 s.d
3.28
3.28
s.d.
2.82
2.82 s.d.
2.44
2.44 s.d
2.16
2.16 s.d.
1.94
1.94 s.d
1.80
2
Pengawasan
konstruksi
(dalam %)
5.35
5.35
s.d
4.62
4.62
s.d.
3.90
3.90
s.d.
3.27
3.27
s.d.
2.73
2.73 s.d.
2.27
2.27
s.d.
1.92
1.92 s.d.
1.65
1.65 s.d.
1.43
1.43 s.d.
1.26
1.26 s.d.
1.18
3
Pengelolaan
Kegiatan
(dalam %)
14.00
14.00
s.d
10.00
10.00
s.d 6.75
6.75 s.d
4.20
4.20
s.d
2.85
2.85 s.d
1.90
1.90
s.d.
1.20
1.20 s.d.
0.80
0.80 s.d.
0.50
0.50 s.d
0.28
0.28 s.d
0.18
2. Prosentase Komponen Biaya Pembangunan Bangunan Gedung Negara Klasifikasi Tidak Sederhana
Tabel F2
Biaya
Konstruksi
fisik (jt
rupiah)
s.d.
250
250
s.d.
500
500
s.d.
1000
1.000
s.d
2.500
2.500
s.d
5.000
5.000
s.d
10.000
10.000
s.d
25.000
25.000
s.d
50.000
50.000
s.d
100.000
100.000
s.d
250.000
250.000
s.d
500.000
Komponen
Kegiatan
1
Perencanaan
konstruksi
(dalam %)
9.00
9.00
s.d.
7.55
7.55
s.d.
6.35
6.35
s.d.
5.37
5.37
s.d.
4.55
4.55 s.d.
3.92
3.92
s.d.
3.42
3.42 s.d.
3.02
3.02 s.d.
2.72
2.72 s.d.
2.50
2.50 s.d.
2.32
2
Manajemen
konstruksi
(dalam %)
7.25
7.25
s.d.
6.20
6.20
s.d.
5.25
5.25
s.d.
4.50
4.50
s.d.
3.80
3.80 s.d.
3.25
3.25
s.d.
2.80
2.80 s.d.
2.48
2.48 s.d.
2.19
2.19 s.d.
2.00
2.00 s.d.
1.89
atau
3
Pengawasan
konstruksi
(dalam %)
6.00
6.00
s.d.
5.20
5.20 s.d
4.45
4.45
s.d.
3.80
3.80
s.d.
3.20
3.20 s.d.
2.70
2.70
s.d.
2.30
2.30 s.d.
2.00
2.00 s.d.
1.78
1.78 s.d.
1.60
1.60 s.d.
1.50
4
Pengelolaan
Kegiatan
(dalam %)
16.00
16.00
s.d.
11.25
11.25
s.d.
7.75
7.75
s.d.
5.10
5.10
s.d.
3.28
3.28 s.d.
2.15
2.15
s.d.
1.42
1.42 s.d.
0.93
0.93 s.d.
0.58
0.58 s.d.
0.31
0.31 s.d.
0.19
3. Prosentase Komponen Biaya Pembangunan Bangunan Gedung Negara Klasifikasi Khusus
Tabel F3
Biaya
Konstruksi
fisik (jt
rupiah)
s.d.
250
250
s.d.
500
500
s.d.
1000
1.000
s.d
2.500
2.500
s.d
5.000
5.000
s.d
10.000
10.000
s.d
25.000
25.000
s.d
50.000
50.000
s.d
100.000
100.000
s.d
250.000
250.000
s.d
500.000
Komponen
Kegiatan
1
Perencanaan
konstruksi
(dalam %)
9.75
9.75
s.d
8.20
8.20
s.d.
6.89
6.89
s.d.
5.85
5.85
s.d.
5.00
5.00 s.d.
4.35
4.35
s.d.
3.85
3.85 s.d.
3.45
3.45 s.d.
3.10
3.10 s.d.
2.90
2.90 s.d.
2.75
2
Pengawasan
konstruksi
(dalam %)
7.95
7.95
s.d.
6.68
6.68
s.d.
5.70
5.70
s.d.
4.87
4.87
s.d.
4.15
4.15 s.d.
3.60
3.60
s.d.
3.10
3.10 s.d.
2.77
2.77 s.d.
2.49
2.49 s.d.
2.30
2.30 s.d.
2.17
3
Pengelolaan
Kegiatan
(dalam %)
16.00
16.00
s.d.
11.25
11.25
s.d.
7.75
7.75
s.d.
5.10
5.10
s.d.
3.28
3.28 s.d.
2.15
2.15
s.d.
1.42
1.42 s.d.
0.93
0.93 s.d.
0.58
0.58 s.d.
0.31
0.31 s.d.
0.19