Ruko 2 dan 3 lantai contoh RAB

23
A. RENCANA ANGGARAN BIAYA RUKO 3 LANTAI Total Pekerjaan Lantai satuanURAIAN PEKERJAANNo 1 1.00 unit 600,000 HargaSatua 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 I. PEKERJAAN PONDASI Direlasi keet/gudang/los ker Rp.600,000 2Uitzet/pasang bouwplank16.00m'30,000Rp.480,000 3Mobilisasi / Demobilisasils2,50 30,000Rp.3,863,400 5Urugan tanah kembali104.54 m 20,000Rp.2,090,800 6Pasir Urug tebal 5 cm2.53 m 125,000Rp.316,250 6Lantai kerja (beton mutu Bo) t=5 cm1.13 m 600,000Rp.675,000 7Pasangan batu kali (di bwh sloof)24.24 m 450,000Rp.10,908,000 Total Pekerjaan Fondasi278.22 m Rp.21,433,450 IIPEKERJAAN BETON 1Pondasi tapak (1,5x1,5m)3.38 m 3,350,000Rp.11,306,250 2Pondasi tapak (1,5x2,3m)1.13 m 3,350,000Rp.3,768,750 3Pekerjaan Sloof 20/404.04 m 3,350,000Rp.13,534,000 4Pekerjaan Sloof 15/300.20 m 3,350,000Rp.678,375 5Balok B1 25/4010.10 m 3,450,000Rp.34,845,000 6Balok B2 20/400.72 m 3,450,000Rp.2,484,000 7Balok B4 15/300.14 m 3,350,000Rp.452,250 8Balok B5 15/15 (Ringbalk)0.83 m 2,250,000Rp.1,873,125 9Kolom K1 (35/35)5.51 m 3,800,000Rp.20,947,500 10Kolom K2 (30/30)1.80 m 3,800,000Rp.6,840,000 11Kolom K3 15/300.28 m 3,600,000Rp.1,004,400 12Kolom KP 15/150.42 m 2,250,000Rp.941,625 13Plat t=12cm14.04 m

Transcript of Ruko 2 dan 3 lantai contoh RAB

A. RENCANA ANGGARAN BIAYA RUKO 3 LANTAITotal Pekerjaan LantaisatuanURAIAN PEKERJAANNo

1 1.00 unit 600,000HargaSatua

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

I. PEKERJAAN PONDASIDirelasi keet/gudang/los kerja Rp.600,000 

2Uitzet/pasang bouwplank16.00m'30,000Rp.480,000 3Mobilisasi / Demobilisasils2,500,000Rp.2,500,000 4Galian Tanah128.78 m

30,000Rp.3,863,400 5Urugan tanah kembali104.54 m

20,000Rp.2,090,800 6Pasir Urug tebal 5 cm2.53 m

125,000Rp.316,250 6Lantai kerja (beton mutu Bo) t=5 cm1.13 m

600,000Rp.675,000 7Pasangan batu kali (di bwh sloof)24.24 m

450,000Rp.10,908,000 Total Pekerjaan Fondasi278.22 m

Rp.21,433,450 IIPEKERJAAN BETON1Pondasi tapak (1,5x1,5m)3.38 m

3,350,000Rp.11,306,250 2Pondasi tapak (1,5x2,3m)1.13 m

3,350,000Rp.3,768,750 3Pekerjaan Sloof 20/404.04 m

3,350,000Rp.13,534,000 4Pekerjaan Sloof 15/300.20 m

3,350,000Rp.678,375 5Balok B1 25/4010.10 m

3,450,000Rp.34,845,000 6Balok B2 20/400.72 m

3,450,000Rp.2,484,000 7Balok B4 15/300.14 m

3,350,000Rp.452,250 8Balok B5 15/15 (Ringbalk)0.83 m

2,250,000Rp.1,873,125 9Kolom K1 (35/35)5.51 m

3,800,000Rp.20,947,500 10Kolom K2 (30/30)1.80 m

3,800,000Rp.6,840,000 11Kolom K3 15/300.28 m

3,600,000Rp.1,004,400 12Kolom KP 15/150.42 m

2,250,000Rp.941,625 13Plat t=12cm14.04 m

3

2

2

2

2

2

2

2

2

3

3

3

2

JumlahHargaTotal Pekerjaan DindingVolumeA. RENCANA ANGGARAN BIAYA RUKO 3 LANTAITotal Pekerjaan LantaisatuanURAIAN PEKERJAANNo

2

3,225,000Rp.45,279,000 14Tangga Beton2.38 m4,200,000Rp.10,006,920 Total Pekerjaan Beton44.96 m

Rp.153,961,195 IIIPEKERJAAN DINDING1Pasangan bata (1pc:5 ps)362.70 m

68,000Rp.24,663,600 2Sopi sopi bata (1 pc :5 ps)22.00 m

72,000Rp.1,584,000 3Plester dinding bata (1pc:5ps)+acian362.70 m

32,500Rp.11,787,750 Rp.38,035,350 IVPEKERJAAN LANTAI1Pasangan keramik lantai 30x30189.00 m

72,000Rp.13,608,000 2Pasangan keramik lt kamar mandi 20x209.00 m

74,000Rp.666,000 Pasangan keramik dinding kamar mandi 20x2039.00 m

76,000Rp.2,964,000 3Border keramik 10x203.90 m

148,000Rp.577,200 4Border keramik teras 10x201.12 m

148,000Rp.165,760 5Urugan Pasir padat t.5 cm3.15 m

125,000Rp.393,750 Rp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACA 1Jendela Muka lt.2+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 2Jendela Muka lt.3+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 3Pintu toilet+daun3.00unit400,000Rp.1,200,000 Rp.19,200,000 VIPEKERJAAN ATAP & PLAFOND1Balok kayu uk. 8/12 Meranti0.22 m

3,600,000Rp.777,600 2Kaso 5/70.19 m

3,700,000Rp.699,300 3papan lisplank 3/20,kayu Meranti9.00m'95,000Rp.855,000 4Asbes 63.00 m

65,000Rp.4,095,000 Total Pekerjaan Kusen, Pintu, Jendela, Bovenlich, Kaca

5Asbes nok4.50m'70,000Rp.315,000 6Plafond Gypsum 162.00 m

65,000Rp.10,530,000 7Lis profil Plafond Gypsum 111.00m'24,000Rp.2,664,000 8Tripleks 4 mm plafond (Toilet)9.00 m

2

2

2

2

2

TOTAL 16 UNITRp.5,093,419,280

67,000Rp.603,000 9List Plafond Kayu (toilet)21.00m'20,000Rp.420,000 Rp.20,958,900 VIIPEKERJAAN PENGECATAN1Cat dinding362.70 m

18,000Rp.6,528,600 2Cat plafond171.00 m

19,000Rp.3,249,000 3Cat List plafond132.00m'12,000Rp.1,584,000 Rp.11,361,600 VIIIPEKERJAAN INSTALASI AIR BERSIH & AIR KOTOR1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 Rp.10,099,000 IXPEKERJAAN SANITAIR1Kloset jongkok merek Ex. KIA3.00bh150,000Rp.450,000 2Bak air fibre glass uk. 60x60x603.00bh200,000Rp.600,000 3keran air merek SAN-EI9.00bh100,000Rp.900,000 4Roof Drain2.00bh80,000Rp.160,000 5Floor drain 3.00bh70,000Rp.210,000 Rp.2,320,000 XPEKERJAAN LAIN-LAIN1Railing besi tangga+Void10.70m'85,000Rp.909,500 2Fin. Kolom depan9.00 m

175,000Rp.1,575,000 3Folding Gate1.00ls6,000,000Rp.6,000,000 4Parkir, Koral sikat motif27.00 m

270,000Rp.7,290,000 Rp.15,774,500 XIPEKERJAAN INSTALASI LISTRIK1Box MCB 2.00bh300,000Rp.600,000 2Box meter1.00bh500,000Rp.500,000 3Titik lampu Termasuk Kabel NYM3x2.5 10.00bh170,000Rp.1,700,000 NYM 2x1.5 & Fitting+Inbow+Tee dus (Acessories)4Lampu tempel2.00bh400,000Rp.800,000 5Saklar dobel4.00bh80,000Rp.320,000 6Saklar Singel4.00bh50,000Rp.200,000 7Stop kontak4.00bh50,000Rp.200,000 8Biaya Penyambungan Daya ListrikLs2,500,000Rp.2,500,000 Rp.6,820,000 Rekapitulasi RAB Ruko 3 Lantai :IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

Rp.318,338,705 

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

=Rp.225,000,000

Rp.338,855,543F.Landscape=Rp.20,000,000Total Keseluruhan RAB

 ATotal Biaya Konstruksi Ruko 2 (Dua) Lantai :27 UnitBlok N-8 No. 8,9,10Blok N-9 No. 11, 12Blok N-10 No. 1,2,3, 5,6,7,8,9,10, 11 & 1221, 22, 23, 25, 26, 27, 28, 29, 30, 31 & 32=Rp.6,109,712,415 BTotal Biaya Konstruksi Ruko 3 (Tiga) Lantai :16 UnitBlok N7 No. 6,7,8,9,10, 11, 12, 15, 16, 17, 18,19,20,21,22 & 23=Rp.5,093,419,280 CTotal Biaya Pekerjaan Jalan & SaluranSaluran blok 6,7,8,10=Rp.1,185,234,750 DLand Clearing

EIzin Mendirikan Bangunan (IMB)=

=Rp.12,972,221,988

C. RENCANA ANGGARAN BIAYAPekerjaan Jalan & Saluran

3

1 ### m3 30,000.00 60,300,000.00 2 Gelar sirdam t=35cm 603.00 m3 ### ###3 Abu batu t=5cm 201.00 m3 ### 38,190,000.00 4 Paving t=8cm ### m2 82,000.00 ###5 Pemadatan ### m2 8,000.00 32,160,000.00 6 Saluran batu kali L=175cm 176.88 m3 ### 79,596,000.00 7 Deuker Saluran air 30.00 m1 ### 19,500,000.00

1 195.00 m3 30,000 5,850,000 2 Gelar sirdam t=35cm 58.50 m3 185,000 10,822,500 3 Abu batu t=5cm 19.50 m3 190,000 3,705,000 4 Paving t=8cm 390.00 m2 82,000 31,980,000 5 Pemadatan 390.00 m2 8,000 3,120,000 6 Saluran batu kali L=175cm 79.28 m3 450,000 35,676,000 7 Deuker Saluran air 8.00 m1 650,000 5,200,000

1 ### m3 30,000 35,100,000 2 Gelar sirdam t=35cm 351.00 m3 185,000 64,935,000 3 Abu batu t=5cm 117.00 m3 190,000 22,230,000 4 Paving t=8cm ### m2 82,000 191,880,000 5 Pemadatan ### m2 8,000 18,720,000 6 Saluran batu kali L=175cm 79.20 m3 450,000 35,640,000 7 Deuker Saluran air 24.00 m1 650,000 15,600,000

V PEKERJAAN BETON TUMBUK/PLESTERAN1 Cor beton tumbuk t=10cm 25.00 m2 600,000 15,000,000 2 Plesteran ban saluran 125.00 m2 32,500 4,062,500

IPEKERJAAN PERSIAPAN1Air KerjaLsRp.1,000,000Rp.1,000,000 2Mobilisasi / Demobilisasi PeralatanLsRp.10,000,000Rp.10,000,000 3Pengukuran / Bowplank70.00 m

Rp.32,500Rp.2,275,000 4Direksi Keet / BedengLsRp.1,500,000Rp.1,500,00II PEKERJAAN ROW 12

Galian tanah badan jalan / saluran2,010.00 m

III PEKERJAAN ROW 10Galian tanah badan jalan / saluran

IV PEKERJAAN ROW 14Galian tanah badan jalan / saluran

D LAND CLEANING 15000 m2 15000 225,000,000

E IZIN MENDIRIKAN BANGUNAN (IMB)1 Ruko 2 lantai = 3% x Rp 5.883.426.770 176,502,803 2 Ruko 3 lantai = 3% x Rp 5.411.757.985 162,352,740

338,855,543

No Uraiam PekerjaanI.

1234 Galian tanah5678

II.123456789

1011121314

PEKERJAAN PONDASIDirelasi keet/gudang/los kerja

2Uitzet/pasang bouwplank16.00m'30,000Rp.480,000 3Mobilisasi / Demobilisasils2,500,000Rp.2,500,000 4Galian Tanah128.78 m Uitzet/pasang bouwplankMobilisasi / Demobilisasils

Urugan tanah kembaliPasir Urug tebal 5 cmLantai kerja (beton mutu Bo) t=5 cmPasangan batu kali (di bwh sloof)Total Pekerjaan Fondasi

PEKERJAAN BETONPondasi tapak (1,5x1,5m)Pondasi tapak (1,5x2,3m)Pekerjaan Sloof 20/40Pekerjaan Sloof 15/30Balok B1 25/40Balok B2 20/40Balok B4 15/30Balok B5 15/15 (Ringbalk)Kolom K1 (35/35)Kolom K2 (30/30)Kolom K3 15/30Kolom KP 15/15Plat t=12cmTangga BetonTotal Pekerjaan Beton44.96 m

I.II.III. PEKERJAAN DINDING

IVPEKERJAAN LANTAIV.VI.VII.

3,225,000Rp.45,279,000 14Tangga Beton2.38 m4,200,000Rp.10,006,920 Total Pekerjaan Beton44.96 m

1Jendela Muka lt.2+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 2Jendela Muka lt.3+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 3Pintu toilet+daun3.00unit400,000Rp.1,200,000 

3,700,000Rp.699,300 3papan lisplank 3/20,kayu Meranti9.00m'95,000Rp.855,000 4Asbes 63.00 m

 Rekapitulasi RAB Ruko 3 Lantai :PEKERJAAN PONDASIPEKERJAAN BETON

PEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACA PEKERJAAN ATAP & PLAFOND

65,000Rp.10,530,000 7Lis profil Plafond Gypsum 111.00m'24,000Rp.2,664,000 8Tripleks 4 mm plafond (Toilet)9.00 m VIIPEKERJAAN PENGECATAN

VIIIPEKERJAAN INSTALASI AIR BERSIH & AIR KOTOR

XIPEKERJAAN INSTALASI LISTRIKTotal 1 UnitTOTAL 16 UNIT

 IXPEKERJAAN SANITAIRXPEKERJAAN LAIN-LAIN

1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 

1Kloset jongkok merek Ex. KIA3.00bh150,000Rp.450,000 2Bak air fibre glass uk. 60x60x603.00bh200,000Rp.600,000 3keran air merek SAN-EI9.00bh100,000Rp.900,000 4Roof Drain2.00bh80,000Rp.160,000 5Floor drain 3.00bh70,000Rp.210,000 

175,000Rp.1,575,000 3Folding Gate1.00ls6,000,000Rp.6,000,000 4Parkir, Koral sikat motif27.00 m

1Box MCB 2.00bh300,000Rp.600,000 2Box meter1.00bh500,000Rp.500,000 3Titik lampu Termasuk Kabel NYM3x2.5 10.00bh170,000Rp.1,700,000 NYM 2x1.5 & Fitting+Inbow+Tee dus (Acessories)4Lampu tempel2.00bh400,000Rp.800,000 5Saklar dobel4.00bh80,000Rp.320,000 6Saklar Singel4.00bh50,000Rp.200,000 7Stop kontak4.00bh50,000Rp.200,000 8Biaya Penyambungan Daya ListrikLs2,500,000Rp.2,500,000 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

Total Biaya Konstruksi Ruko 2 (Dua) Lantai :27 UnitBlok N-8 No. 8,9,10Blok N-9 No. 11, 12Blok N-10 No. 1,2,3, 5,6,7,8,9,10, 11 & 1221, 22, 23, 25, 26, 27, 28, 29, 30, 31 & 32=

BTotal Biaya Konstruksi Ruko 3 (Tiga) Lantai :16 UnitBlok N7 No. 6,7,8,9,10, 11, 12, 15, 16, 17, 18,19,20,21,22 & 23=

1Air KerjaLsRp.1,000,000Rp.1,000,000 2Mobilisasi / Demobilisasi PeralatanLsRp.10,000,000Rp.10,000,000 3Pengukuran / Bowplank70.00 m

Satuan Harga satuan Total

1.00 Unit 600,000 600,000 16.00 m' 30,000 480,000 1.00 Satuan 2,500,000 2,500,000

### m3 30,000 3,863,400 ### m3 20,000 2,090,800

2.53 m3 125,000 316,250 1.13 m3 600,000 675,000 24.24 m3 450,000 10,908,000 278.22 m3 21,433,450

3.375 m3 3,350,000 11,306,250 1.125 m3 3,350,000 3,768,750 4.04 m3 3,350,000 13,534,000

0.2025 m3 3,350,000 678,375 10.1 m3 3,450,000 34,845,000 0.72 m3 3,450,000 2,484,000

0.135 m3 3,350,000 452,250 0.8325 m3 2,250,000 1,873,125 5.5125 m3 3,800,000 20,947,500

1.8 m3 3,800,000 6,840,000 0.279 m3 3,600,000 1,004,400

0.4185 m3 2,250,000 941,625 14.04 m3 3,225,000 45,279,000

2.3826 m3 4,200,000 10,006,920 44.96 m4 ###

21,433,450 ###

38,035,35018,374,71019,200,00020,958,90011,361,600

1Jendela Muka lt.2+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 2Jendela Muka lt.3+kaca (kusen alu 4/10)1.00unit9,000,000Rp.9,000,000 3Pintu toilet+daun3.00unit400,000Rp.1,200,000 

PEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACA 

VIIIPEKERJAAN INSTALASI AIR BERSIH & AIR KOTOR 10,099,0002,320,000

15,774,5006,820,000

###### Rp.5,093,419,280

1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 

1Kloset jongkok merek Ex. KIA3.00bh150,000Rp.450,000 2Bak air fibre glass uk. 60x60x603.00bh200,000Rp.600,000 3keran air merek SAN-EI9.00bh100,000Rp.900,000 4Roof Drain2.00bh80,000Rp.160,000 5Floor drain 3.00bh70,000Rp.210,000 

1Box MCB 2.00bh300,000Rp.600,000 2Box meter1.00bh500,000Rp.500,000 3Titik lampu Termasuk Kabel NYM3x2.5 10.00bh170,000Rp.1,700,000 NYM 2x1.5 & Fitting+Inbow+Tee dus (Acessories)4Lampu tempel2.00bh400,000Rp.800,000 5Saklar dobel4.00bh80,000Rp.320,000 6Saklar Singel4.00bh50,000Rp.200,000 7Stop kontak4.00bh50,000Rp.200,000 8Biaya Penyambungan Daya ListrikLs2,500,000Rp.2,500,000 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

Total Biaya Konstruksi Ruko 2 (Dua) Lantai :27 UnitBlok N-8 No. 8,9,10Blok N-9 No. 11, 12Blok N-10 No. 1,2,3, 5,6,7,8,9,10, 11 & 1221, 22, 23, 25, 26, 27, 28, 29, 30, 31 & 32=

1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 

1Box MCB 2.00bh300,000Rp.600,000 2Box meter1.00bh500,000Rp.500,000 3Titik lampu Termasuk Kabel NYM3x2.5 10.00bh170,000Rp.1,700,000 NYM 2x1.5 & Fitting+Inbow+Tee dus (Acessories)4Lampu tempel2.00bh400,000Rp.800,000 5Saklar dobel4.00bh80,000Rp.320,000 6Saklar Singel4.00bh50,000Rp.200,000 7Stop kontak4.00bh50,000Rp.200,000 8Biaya Penyambungan Daya ListrikLs2,500,000Rp.2,500,000 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 

1Box MCB 2.00bh300,000Rp.600,000 2Box meter1.00bh500,000Rp.500,000 3Titik lampu Termasuk Kabel NYM3x2.5 10.00bh170,000Rp.1,700,000 NYM 2x1.5 & Fitting+Inbow+Tee dus (Acessories)4Lampu tempel2.00bh400,000Rp.800,000 5Saklar dobel4.00bh80,000Rp.320,000 6Saklar Singel4.00bh50,000Rp.200,000 7Stop kontak4.00bh50,000Rp.200,000 8Biaya Penyambungan Daya ListrikLs2,500,000Rp.2,500,000 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

1Pipa PVC diameter 1/2"2.00m'7,000Rp.14,000 Pipa PVC diameter 3/4"23.00m'10,000Rp.230,000 2Pipa PVC diameter 3'(air bekas)22.50m'30,000Rp.675,000 3Pipa PVC diameter 4'(dari kloset)23.00m'50,000Rp.1,150,000 4Septik tank + rembesan1.00unit1,750,000Rp.1,750,000 5Sumur Pantek1.00Ls2,000,000Rp.2,000,000 6Pompa LG250W1.00bh2,000,000Rp.2,000,000 7Bak kontrol1.00bh280,000Rp.280,000 8Biaya Penyambungan PAMLs2,000,000Rp.2,000,000 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

IPEKERJAAN PERSIAPAN/ PONDASIRp.21,433,450 IIPEKERJAAN BETONRp.153,961,195 IIIPEKERJAAN DINDINGRp.38,035,350 IVPEKERJAAN LANTAIRp.18,374,710 VPEKERJAAN KUSEN,PINTU,JENDELA, BOVENLICH, KACARp.19,200,000 VIPEKERJAAN ATAP & PLAFONDRp.20,958,900 VIIPEKERJAAN PENGECATANRp.11,361,600 VIIIBIAYA PENYAMBUNGAN PAM ls Rp.2.000.000Rp.10,099,000 IXBIAYA PENYAMBUNGAN DAYA LISTRIK ls Rp.2.500.000Rp.2,320,000 XPEKERJAAN LAIN-LAINRp.15,774,500 XIPEKERJAAN INSTALASI LISTRIKRp.6,820,000 Total Pekerjaan Atap & PlafondTotal Pekerjaan PengecatanTotal Pekerjaan Instalasi Air Bersih & Air Kotor Total Pekerjaan Instalasi ListrikTotal Pekerjaan Lain-LainTotal Pekerjaan Sanitair 

Ringbalk 0.8325 m315x15 0.0225 m2keliling 37 m

4.5 14 m

14.04 m3luas lantai 58.5 m2pjg 13 m3lobang tangga 1 m3

Plat t=12cm