PUBLIC HEARING REPORT (PHR)
Santa Cruz Cement Grinding Facility
Barangay Darong, Sta. Cruz, Davao del Sur
Submitted by:
ORO CEMENTO INDUSTRIES CORPORATION
Submitted to:
ENVIRONMENTAL MANAGEMENT BUREAU
CENTRAL OFFICE
27 November 2018
27 November 2018 DIR. METODIO U. TURBELLA Director, Environmental Management Bureau – Central Office Department of Environment and Natural Resources EMB Building, DENR Compound, Visayas Avenue Diliman, Quezon City ATTENTION : ENGR. ESPERANZA A. SAJUL Chief, EIAMD SUBJECT : Public Hearing Report (PHR) Santa Cruz Cement Grinding Facility Brgy. Darong, Sta. Cruz, Davao del Sur Dear Dir. Turbella, We are submitting herewith the Public Hearing Report (PHR) of the Proposed Santa Cruz Cement Grinding Facility in Barangay Darong, Sta. Cruz, Davao del Sur. The PHR documents issues and suggestions raised by various stakeholders during the Public Hearing conducted at the Barangay Darong Covered Court in Brgy. Darong, Sta. Cruz, Davao del Sur on November 16, 2018 (Friday). For inquiries, you may contact our EIA Study Team, LCI Envi Corporation through Mr. Jerome B. Leano at (02) 442-2830. Very truly yours, MR. FERDINAND K. CONSTANTINO President/Director Oro Cemento Industries Corporation
TABLE OF CONTENTS 1.0 PROJECT OVERVIEW .......................................................................................................... 1 2.0 ACTIVITY RATIONALE ......................................................................................................... 2 3.0 CONDUCT OF THE PUBLIC HEARING ................................................................................... 4 4.0 SUMMARY OF ISSUES AND CONCERNS ............................................................................... 5 5.0 PHOTO-DOCUMENTATION ................................................................................................. 7
LIST OF TABLES Table 1: Proposed Project, Proponent and EIA Preparer Details ...................................................................... 1 Table 2: List of Invitees for the Public Hearing ................................................................................................. 2 Table 3: Participants in the Public Hearing ....................................................................................................... 4 Table 4: Matrix of Issues, Concerns, and Suggestions raised during the Public Hearing ................................... 5
LIST OF FIGURES Figure 1: Public Hearing Program ..................................................................................................................... 3 Figure 2: Photo Documentation of the Public Hearing ..................................................................................... 7 Figure 3: Photo Documentation of the Public Hearing (Continuation) ............................................................. 8 Figure 4: Photo Documentation of the Public Hearing (Continuation) ............................................................. 9
LIST OF ATTACHMENTS Attachment 1 Proof of Publication of the Notice of Public Hearing (November 2 & 9, 2018)
Attachment 2 Proof of Receipt of Public Hearing Invitation Letters
Attachment 3 Public Hearing Attendance Sheet
Attachment 4 Public Hearing Presentation Material
Attachment 5 Transcript of the Public Hearing Proceedings
Attachment 6 Video Recording of the Public Hearing Proceedings
ORO CEMENTO INDUSTRIES CORPORATION Section 1 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Project Overview Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 1
SECTION 1
1.0 PROJECT OVERVIEW
1 Oro Cemento Industries Corporation (OCIC) intends to put up a cement grinding facility in Barangay Darong, Sta. Cruz, Davao del Sur. The facility will have cement grinding equipment, bulk storage, and other support facilities. It will have a production capacity of 2 million metric tons per year (MMTPY).
Table 1: Proposed Project, Proponent and EIA Preparer Details
PROJECT NAME Santa Cruz Cement Grinding Facility
PROJECT LOCATION Province of Davao del Sur, Municipality of Sta. Cruz, Barangay Darong
TYPE OF PROJECT • Cement (Clinker) Grinding Process
PROJECT SIZE 2.0 Million Metric Tons per Year (MMTPY) Cement 50,000,000 Cement Bags
PROJECT PROPONENT
ORO CEMENTO INDUSTRIES CORPORATION MR. FERDINAND K. CONSTANTINO President/Director SMC Head Office Complex San Miguel Avenue, Mandaluyong City 1603 Metro Manila, Philippines
EIA PREPARER
LCI ENVI CORPORATION ENGR. JOSE MARIE U. LIM EIA Team Leader Unit 8L-M Future Point Plaza 3 111 Panay Avenue, South Triangle Quezon City, Metro Manila, Philippines Tel. No.: (632) 442-2830 / Fax No.: (632) 961-9226
ORO CEMENTO INDUSTRIES CORPORATION Section 2 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Activity Rationale Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 2
SECTION 2
2.0 ACTIVITY RATIONALE
2 The Public Hearing was agreed upon during the 1st Technical Review of the Review Committee (REVCOM) last 28th of September 2018. The Notice of Public Hearing was officially posted on https://eia.emb.gov.ph/notice-of-public-hearingconsultation_link/ last 26th of October 2018. Included in the uploaded documents were the latest Environmental Impact Statement (EIS) and EIS Summary for the Public (ESP) written in both Filipino and English.
3 The Notice of Public Hearing was published in Manila Bulletin last 2nd and 9th of November 2018 (SEE: Attachment 1).
4 The distribution of the official invitations from the DENR Environmental Management Bureau (EMB) were conducted on the 5th of November 2018 onwards. The following were invited:
Table 2: List of Invitees for the Public Hearing
SECTOR/OFFICE ADDRESSED TO
LGUs in areas where all project facilities proposed to be constructed/situated and where all operations are proposed to be undertaken
• Municipal LGU of Sta. Cruz (Host Municipal LGU)
Hon. Alexis Almendras (Municipal Mayor) Sta. Cruz Municipal Hall, Sta. Cruz, Davao del Sur
Attention:
• Municipal Planning and Development Office (MPDO)
• Municipal Engineer’s Office (MEO)
• Municipal Environment and Natural Resources Office (MENRO)
• Municipal Health Office (MHO)/Rural Health Unit (RHU)
• Barangay Darong (Host Barangay)
Hon. Imad Sanlocan (Barangay Captain) Darong Barangay Hall, Sta. Cruz, Davao del Sur
Government agencies with related mandate on the type of project and its impacts
• DENR Region 11 Regional Director Ruth Tawantawan Km. 7, Lanang, Davao City
• DENR PENRO Davao del Sur
OIC Pablito Ofrecia Mabini Superhighway, Digos City, Davao del Sur
• DENR CENRO Digos City CENR Officer Ruel Colong Capitol Compound, Digos City
Interest groups (NGOs/POs) preferably those with mission/s specifically related to the type and impacts of the proposed undertaking
• BFARC Mr. Jamil Onutan Chairman
• Women Mrs. Letecia Sundiam Focal Person
• BREAD-MPC Mr. Felix Lupio Jr. Chairman
• Senior Citizen Mr. Amelito Domaboc President
Households, business activities, industries that will be displaced
• None identified
ORO CEMENTO INDUSTRIES CORPORATION Section 2 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Activity Rationale Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 3
SECTOR/OFFICE ADDRESSED TO
People whose socio-economic welfare and cultural heritage are projected to be affected by the project especially vulnerable sectors and indigenous populations
• None identified
Local institutions (schools, churches, hospitals)
• Darong Elementary School Mr. Enrique Amaro Principal
5 The received invitation letters are presented in Attachment 2 of this report. The Public Hearing program is shown in Figure 1.
Figure 1: Public Hearing Program
FIGURE NO.
1 FIGURE TITLE
Public Hearing Program PROJECT PROPONENT:
ORO CEMENTO INDUSTRIES CORPORATION
PROJECT TITLE & LOCATION:
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Barangay Darong, Sta. Cruz, Davao del Sur
REPORT PREPARER:
LCI ENVI CORPORATION
ORO CEMENTO INDUSTRIES CORPORATION Section 3 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Conduct of the Public Hearing Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 4
SECTION 3
3.0 CONDUCT OF THE PUBLIC HEARING
6 The Public Hearing activity was conducted from 9:00AM to 1:00PM on the 16th of November 2018 (Friday) at the Barangay Darong Covered Court located in Brgy. Darong, Sta. Cruz, Davao del Sur. The composition of the participants is presented in Table 3. The meeting was facilitated by the DENR EMB Central Office Case Handlers and Public Hearing Officer.
Table 3: Participants in the Public Hearing
STAKEHOLDER GROUP/OFFICE/ORGANIZATION TOTAL NO. OF
REPRESENTATIVES
GENDER DISTRIBUTION
Female Male
• (a) LGUs in areas where all project facilities are proposed to be constructed/situated and where all operations are proposed to be undertaken
o Municipality of Sta. Cruz, Davao del Sur 3 2 1
o Barangay Darong, Sta. Cruz, Davao del Sur 34 18 16
• (b) Government agencies with related mandate on the type of project and its impacts
o DENR EMB (Central Office) 3 1 2
o DENR Region XI 2 2 -
• (c) Interest groups, preferably those with mission/s specifically related to the type and impacts of the proposed undertaking
o Various Sectoral Representatives from Brgy. Darong
102 50 52
• EIA Review Committee 3 2 1
• Oro Cemento Industries Corporation (Proponent) 6 - 6
• LCI Envi Corporation (EIA Consultant) 2 - 2
TOTAL 155 75 80
7 A copy of the attendance sheets is provided as Attachment 3 of this report.
ORO CEMENTO INDUSTRIES CORPORATION Section 4 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Summary of Issues and Concerns Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 5
SECTION 4
4.0 SUMMARY OF ISSUES AND CONCERNS
8 The presentation material that guided the flow of the Public Hearing is provided as Attachment 4 of this report. The pertinent issues, concerns, and suggestions raised by the participants during the open forum and the corresponding responses of the project proponent and EIA consultant are summarized in the matrix below.
Table 4: Matrix of Issues, Concerns, and Suggestions raised during the Public Hearing
ISSUE/CONCERN RAISED ISSUE/CONCERN RAISED BY RESPONSE FROM THE PROPONENT/CONSULTANT
PROJECT LOCATION
Can you show where the project will be located?
Brgy. Darong Kagawad The project is located besides the San Miguel Foods, Inc. (SMFI) Feed Mill facility.
WATER CONSUMPTION
How much is the water consumption of project?
Brgy. Darong Sectoral Representative
Since the project employs dry-process, the project only needs 110 cu. m/day for process cooling, greening and domestic use.
MARINE ASSESSMENT
Can the proponent’s marine assessment be validated with DENR Regional Office’s marine experts? This is so we could avoid duplication of works?
CENRO Digos City Representative
This suggestion is noted by Oro Cemento. All information pertaining to the results of the marine assessment for the EIA is presented in the report.
IMPACTS OF THE PROJECT
Can your product (cement) cause cancer (carcinogens)?
Brgy. Darong Sectoral Representative
At present, there are no literatures/studies indicating that cement products can cause cancer.
Will your products generate noise during operation? Do you have mitigating measures for it?
Brgy. Darong Sectoral Representative
The project will definitely produce noise. The project will be constructed far enough (middle of the property) from the neighborhood. Further, the project will have mitigating measures to attenuate noise (walls, mufflers, etc.). We will ensure that the project will follow the set standards from NPCC and avoid any discomfort (noise) in the community.
What will happen if there will be oil spill in the sea?
Brgy. Darong Sectoral Representative
Vessels calling at the port will not be working on items which might cause oil spill, however if and when such happens, a contingency plan is in place to address it. The EIS report for the project identified oil spill and ensured that proper mitigating measures are applied.
ORO CEMENTO INDUSTRIES CORPORATION Section 4 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Summary of Issues and Concerns Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 6
ISSUE/CONCERN RAISED ISSUE/CONCERN RAISED BY RESPONSE FROM THE PROPONENT/CONSULTANT
MULTI-PARTITE MONITORING TEAM (MMT)
Will the project have multi-partite monitoring? Who will be the members of the MMT?
Brgy. Darong Sectoral Representative
The project will have an MMT. The members of the MMT will be determined after the issuance of the Environmental Compliance Certificate (ECC). The MMT composition will be based on DENR’s new DAO.
INFORMATION, EDUCATION AND COMMUNICATION CAMPAIGN (IEC)
Can we have another meeting to discuss futher the effects of the project to the community?
Municipal Planning and Development Office
Representative
This is noted by Oro Cemento, but we should schedule this after the review of the EIS is finished.
BIOSECURITY
Can you verify if it is allowed to plant trees near the feed mill facility? As mentioned in our coordination meeting with SMFI, they discourage tree planting, as it can cause birds to go near the feed mill.
Sta. Cruz LGU Representative
The trees to be planted are non-fruit bearing trees. The facilities to be constructed, like warehouses and offices, are closed. We will also be coordinating with SMFI regarding this.
SITE VISITATION
Is it possible to have a site visit for barangay officials to similar projects (cement/grinding plants) that SMC is currently operating?
Barangay Darong Barangay Captain
We will be coordinating with your office (barangay) for the new schedule of the site visit.
GREENING PROGRAM
May we suggest that the greening program in the peripheries will benefit the public? May we suggest further that fruit-bearing trees be planted?
CENRO Digos City Representative
As mentioned earlier, planting of fruit bearing trees is discouraged by Feedmill management to avoid attracting birds and insects that may contaminate their raw materials for feeds.
PROPOSED SCHOOL LOCATION
What is the update on the promised location of the Darong High School?
Education Sectoral Representative
This is still being discussed with the management. As we are still looking for a location that will benefit the students. Once finalized, we will be coordinating with the barangay. It will be better if the barangay and school representatives will suggest a location for Oro Cemento to consider.
9 The full transcript and video documentation of the public hearing proceedings are presented in Attachments 5 & 6, respectively.
ORO CEMENTO INDUSTRIES CORPORATION Section 5 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Photo-Documentation Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 7
SECTION 5
5.0 PHOTO-DOCUMENTATION
10 The photo-documentation of the Public Hearing is presented in Figures 2 to 4, respectively.
Figure 2: Photo Documentation of the Public Hearing
Postings for the Public Hearing Activity
Opening Prayer and National Anthem
SOURCE: Photos taken by LCI Study Team on November 16, 2018 FIGURE NO.
2 FIGURE TITLE
Photo Documentation of the Public Hearing PROJECT PROPONENT:
ORO CEMENTO INDUSTRIES CORPORATION
PROJECT TITLE & LOCATION:
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Barangay Darong, Sta. Cruz, Davao del Sur
REPORT PREPARER:
LCI ENVI CORPORATION
ORO CEMENTO INDUSTRIES CORPORATION Section 5 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Photo-Documentation Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 8
Figure 3: Photo Documentation of the Public Hearing (Continuation)
Presentation of the EIA Process and the Guidelines for the Public Hearing
Presentation of the Project Description & the Result of the EIA Study Process
SOURCE: Photos taken by LCI Study Team on November 16, 2018 FIGURE NO.
3 FIGURE TITLE
Photo Documentation of the Public Hearing (Continuation) PROJECT PROPONENT:
ORO CEMENTO INDUSTRIES CORPORATION
PROJECT TITLE & LOCATION:
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Barangay Darong, Sta. Cruz, Davao del Sur
REPORT PREPARER:
LCI ENVI CORPORATION
ORO CEMENTO INDUSTRIES CORPORATION Section 5 PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Photo-Documentation Brgy. Darong, Sta. Cruz, Davao del Sur PUBLIC HEARING REPORT
Page 9
Figure 4: Photo Documentation of the Public Hearing (Continuation)
Open Forum
SOURCE: Photos taken by LCI Study Team on November 16, 2018 FIGURE NO.
4 FIGURE TITLE
Photo Documentation of the Public Hearing (Continuation) PROJECT PROPONENT:
ORO CEMENTO INDUSTRIES CORPORATION
PROJECT TITLE & LOCATION:
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY Barangay Darong, Sta. Cruz, Davao del Sur
REPORT PREPARER:
LCI ENVI CORPORATION
ATTACHMENT 1 PROOF OF PUBLICATION OF THE NOTICE OF
PUBLIC HEARING (NOVEMBER 2 & 9, 2018) PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY
BARANGAY DARONG, STA. CRUZ, DAVAO DEL SUR
ATTACHMENT 2 PROOF OF RECEIPT OF PUBLIC HEARING
INVITATION LETTERS PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY
BARANGAY DARONG, STA. CRUZ, DAVAO DEL SUR
NA--?
Republic of the Philippines
Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAUDENR Compound, Visayas Avenue, Diliman Quezon City 11 16
Telephone Nos.: (632) 927-1517,928-3725; Fax No.: (632)920-2258
Website: http://www.emb.gov.Ph
ocr 2 4 eOffi
[+".\ {Yl
Dear
We are pleased to invite you to attend the Public Hearing of the proposed Cement Grinding
Facitity of the Oro Cemento Industries Corporation. The said hearing is scheduled on 16 November
20lS (i'riday) at 9:00 AM (registration starts at 8;00 am) atBarangay Darong Multi-Purpose Center,
Santa Craz, Davao del Sur.
The public Hearing will be conducted as part of the requirements of the proponent's application
for an Environmental Compliance Certificate (ECC). Interested parties will be given the opportunity to
express freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office or
email it at [email protected] on or before 13 November 2018. Those who will not be able to register or
submit wriuen-positions may be given the opportunity to share their issues on the day of the hearing itself.
Herewith is the project's Executive Summary forthe Public (ESP) for yourreference. The project's
Environmental Impact Staiement (EIS) is downloadable on our website: www.emb.sov.ph (kindly occess
the Notice of Pubiic Hearing/Consultation linkfound in the lower right portion of our web page) while
the hard copies are available in this Office, and in the following offices:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy' 27-C, Davao City(082) 234-006r
2,. Municipal Planning and Development Office (Santa Craz, Davao del Sur)
Municipal Hall of Santa Cruz, Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 41.
Sincerely yours,
ENGR. ZA A. SAJULChief, EIA
[-^b.r-^,4i&
Norri U?/ur f
osl
foc^Ft*J \
Protect the enuironment... Protect life...
DivisionI
Republic of the phiiippinesDepartment of Environment and Natural Resources
ENVIR, ONMENTAI, MANAGEME}dT BUtsEAUDENR Compound, Visayas Avenue, Diliman euezon City 1116
Telephone Nos,: (632) 927"1517,928-3725: Fax No.: (632) 920"2258Website: http://www.emb.gov. ph
Chief, EIA
;ffiMd,W-ffi''rry.*.ry'd'P"
ffifrT I * 8#?$
MRS. LETECIA SUNDIAMFocal PersonKABABAIHANBarangay Darong, Santa Cruz, Davao del Sur
Dear Mrs, Sundiam;
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacility of the Oro Cemento Industries Corporation. The said hearing is scheduled on 16 November2018 (Friday) at 9:00 AM (registration starts at 8:00 am) atBarangay Darong Multi-Purpose Center,Santa Crtz, Davao del Sur.
The Public Hearing will be conducted as paft of the requirements of the proponent's applicationfor an Environmental Compliance Certificate (ECC). Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office oremail it at [email protected] on or before 13 November 2018. Those who will not be able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearing itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. The project'sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.sov.rrh (kindly accessthe Notice of Public Hearing/Consultation linkfound in the lower right portion of our web page) whiiethe hard copies are avaiiable in this office, and in the following offices:
1. EMB Region XI3rd Avenue colTrer V. Guzman St., Brgy. 27-C, Davao City(082) 234-006t
2. Municipal Planning and Development Office (Santa Cruz,Davao del Sur)Municipal Hall of Santa Cruz, Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 41,.
Sincerely yours,
ENGR. E A. SAJUL
7
,,1 rl rr0
Ysc-e*,.|-d 14
Protect. the enuironment... Protect li.fe"
Divisioni
N*'%Wflrywdryer.ryry4:y
Republic of the philippinesDepartment of Environment and Natural Resources
&H-/*IK CIN ibf E NYAL MI.NA GM ME },{'r ffi UM, }IA [iDENR Conrpound, Visayas Avenue, Dilirnan euezoir City l1 16
Telephone Nos.: (632) gZT-1517.028-37t5; Fax Nc.: (632) 920_22SS
Website: http:/lwwv,,,,emb. gov.ph
,fimtpdssMR. JAMIL ONUTANChairmanBFARCBarangay Darong, Santa Crtz, Davao del Sur
Dear Mr. Onutan:
\
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacility of the Oro Cemento Industries Corporation. The said hearing is scheduled on 16 Novemtrer2018 (Friday) at 9:00 AM (registration storts at 8:00 am) atBarangay Durorg Multi-purpose Center,Santa Cruz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent,s applicationfor an Environmental Compliance Certificate (EaC). Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ questions aboutihe project.
Kindly register in person or submit your opinion(s) in a concise position paper to this office oremail it at [email protected] on or before 13 November 2018. Those who wili ,roi b. able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearirig itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. Tire project,sRnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.eov.nh (kincly accesstheNoticeofPublicHearing/Consultationlinkfoundinthelower,rghmm,bpage)w1riiethe hard copies are available in this office, and in the following offices:
-
1. EMB Region XI3rd Avenue comer V. Guzman St., Brgy. 27-C,Davao City(082) 234-0061
2. Municipal Planning and Development Office (Santa CruzrDavao del Sur)Municipal Hall of Santa Cfisz,Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office ar Tel. Nos. (02) 9ZO-2240 to 41.
Sincerely yours,
ENGR.Chief,
A. SAJULf < c.n*-7
Protect, th"e enuiranntent... ilrotect l,ift:
and Division
RePublic of the PhiliPPines
Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAUDENR Compound, Visayas Avenue, Diliman Quezon City 1 1 16
Telephone Nos.: (632) 927'1517,928-3725; Fax No': (632) 920-2258
Website: httP//www.emb.gov'Ph
ocT ? { 2St9
MR. FELrX LUPIO, JR.ChairmanBREAD-MPCBarangay Darong, Santa Cruz, Davao del Sur
Dear Mr. LuPio, Jr.:
We are pleased to invite you to attend the Public Hearing of the proposed 9"-:il,GrindingFacility of the oro cemento Iniustries corporation. The said hearing is scheduled on 16 November
2018 (Friday) at 9:00 AM (registration starts at 8:00 am) at Barangay Darong Multi-Purpose center'
Santa Cruz,Davao del Sur.
The public Hearing will be conducted as part of the requirements of lhe proponent's application
for an Environmental Compliance Certificate @aC). Interested parties will be given the opportunity to
express freely their concerns/support/oppositiorV questions about the project'
Kindly register in person or submit your opinion(s) in a concise position paper to this Office or
email it x [email protected], on or before li Novemb er 2018. Those who will not be able to register or
submit written positions may be given the opportunity to share their issues on the day of the hearing itself'
Herewith is the project's Executive Summary for the Public (ESP) for your reference' The project's
Environmental Impact Statement (EIS) is downloadable on our website: www.emb.gov.ph ftindly access
the Notice of public Hearing/Consultation link found in the lower tight portion of our web page) while
the hard copies are u,ailable in this Office, and in the following offices:
1. EMB Region XI3rd Avenue corner V. Guzman St', Brgy. 27-C, Davao City(082) 234-006t
2. Municipal Planning and Development Office (Santa CruzrDavao del Sur)
Municipal Hall of Santa Cruz, Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division
(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 4L
Sincerely yours,
ENGR. A. SAJULChief,
Y&a\4; h,Protect th,e enuironment... Protect life..
Division
Repubiic of the philippinesDepartment of Environment and Natural Resources
g{ iti V { ffi *, }r ,y[H ]{l[.:LL ],tA hr .i,. i-iEI Iv$ fi ]_, T ffi U & i{A t lDENR Compounii, Vrsayas Avenue , Diiiman eue:cn City .i 1 16ielephone Nos.: (63t) g2T-1517,928-il25;
fax ruo : (032) g?0_Z2Sg
Website: http:liwww.en,.b.gov. ph
we are pleased to invite you to attend the Public ,*u..fTs of th9 proposed cement GrindingFacility of the oro cemento Industries corporation. The said hearing is scheduled on 16 Novernrrer3:1?Jl}ffli:*':.tff, ft.esisrration starts at B'00 am) atBarangay ilu"o,g Murti-purpose cemten,
The Public H.ealins will be conducted as part of the requirements of the proponent,s applicatio,for an Environmental compliance certificate (EiC). irt"rl""a parties will be given the opporrunity toexpress freely their concerns/support/opposition/ qu.rtior* ubout the project.
Kindly register in person or submitJour opinion(s) in a concise position paper to this office oremail it at eia@emb'gov'ph on or before 13 Novemb". z'otg. Those *n" *iii not be able to register orsubmit written positions may be given the opportuni t;; ilr.. their issues on the day of the hearing itserf.
Herewith is the project's Executive-summary for the public (ESp) for your reference. The project,sEnvironmental lmpac-t staLment (EIS) is downloada;i;;;"* website:www.emb.sov.nh (kindry accessthe Notice of Public Hearing/coisuliarion tinkfound t" rh;;t;;;;;ghffi" oJ our v,eb pase)wh,ethe hard copies are availabre in this office, and in the following offices:
ocT 2 4 Z}ffiMR. ENRIQUE AMAROPrincipalDARONG ELEMENTARY SCHOOLBarangay Darong, Santa Cruz,Oavao Jef Sur
Dear Mr. Amaro:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27-C,Davao City(082) 234-0061
2. Municipal Planning and Deveropmelt office (santa cruz,Davao del Sur)Municipal Hall of Santa eruz,Dai,ao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 ta 41.
Sincerely yours,
{<-d444 b)
ENGR.Chief, EIA
A. SAJUL
Protet:i. th.e etu;it"on,nten t... Fratect li{e
Division
Yw{lww@eew'ruffi
@.sffi#ryffir..
Repubiic of the PhilippinesDepartment of Environment and Natural Resources
ENVIRONMENTAL IWAhIAGEMENT BUR,EAUDENR Compound, Visayas Avenue, Diliman euezr:n City 1 1 16
Telephone Nos,: (632) gZT-151T,gZg-l7ZS;Fax No.: (632) 920.22SSWebsite: http:i/wi,rntr.emb,gov.ph
.OcT 2 4 2019
MR. AMELITO DOMABOCPresidentDARONG SENIOR CITIZEN ASSOCIATIONBarangay Darong, Santa Cruz,Davao del Sur
Dear Mr. Domaboc
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacilify of the Oro Cemento Industries Corporation. The said hiaring is scheduled on 16 November2018 (Friday) zt 9:00 AM (registration starts at B;00 am) at Barangay iu.org Multi-purpose Center,Santa Craz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent,s applicatiolfor an Environmental compliance certificate @aC). Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this offrce oremail it at [email protected]'ph on or before 13 November 2018. Those who will ,roi b. able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearirig itselr.
Herewith is the project's Executive Summary for the Pubtic (ESp) for your reference. The project,sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.eov,ph (kindty accessthe Notice of Pubtic Hearing/Consultation linkfound in the lower rigtomn of our web page) whilethe hard copies are available in this office, and in the following offices:
-
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27-C,Davao City(082) 234-006r
2. Municipal Planning and Development Office (Santa CruzrDavao del Sur)Municipal Hall of Santa &uz, Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) TZ0-ZZ4O to 4t.
tLa\^*) qSincereiy yours,
ENGR.Chief,
A. SAJUL
Pratect tlrc tn.uirorument.. " Fratect, li.fe
and Division
ffi%Wrywwery-*.ry5y
Republic of the philippinesDepartment of Environment and Natural Resources
}tr &] \U,'{ R O N I/} E hITAL }'[ ANAGE ME N T: R T-] R, N]A UDENR Compound, tlisayas Avenue, Diiiinan euezon City 1.116
Telephone Nos.: (632) 927-1517,928-3725., Fax No.: (632) 920-2258
Website: http:/lwww.emb. gov. ph
"0CT ?, * ZtllP
MS. RUTH TAWANTAWANRegional DirectorDENR REGION 11Krn.7, Lanang, Davao City
Dear Ms. Tawantawan:
#Hrd$q l{Hffie**rdr; iU*rgt
JB- l6to
LJ
i'i*s* .
T lrno .
U\I " ""';
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrinrlingFacilify of the Oro Cemento Industries Corporation. The said hearing iJscheduled on 16 Novemben2018 (F'riday) at 9:00 AM (registration starts at 8:00 am) atBarangay Duroog Multi-purpose Center,Santa Cruz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent's applicationfor an Environmental Compliance Certificate (ECC). Interested parties will be g1""" the opporiunity toexpress freely their concerns/support/opposition/ questions aboutihe project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office oremail it at [email protected] on or before 13 November 2018. Those who will rro-t U. able to register orsubmit written positions may be given the opportunity to share their issues on the day of the heariig itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. The project,sEnvironmental Impact Statement (EIS) is downloadable on our website: wrnrry.emb.gqv.nh (kindiy accessthe Notice of Public Hearing/Consultation linkfound in the lower rtglrt w;i;fi", *rU poid whilethe hard copies are avallable in this office, and in the following offices:
-
1. EMB Region XI3rd Avenue corner V, Guzman St., Brgy. Z7-C, Davao City(082)234-006t
2' Municipal Planning and Development Office (Santa Crtz,Davao del Sur)Municipal Hall of Santa Cruz, Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Offrce at Tel, Nos. (02) 920-2240 to 4t.
Sincerely yours,
ENGR, A. SAJULChief
Protect tlt.e erutti,t"ortnten t... Protect lil,e.,.
Division
werry,@wyocT 2 4 2018
MR. PABLITO OFRECIAOfficer-in-ChargePENRO DAVAO DEL SURMabini Superhighway, Digos City, Davao del Sur
Dear Mr. Ofrecia:
Republic of the philippinesDepartment of Environment and Natural Resources
H N V f R, $Nlyftr]-IyAf, tW:{}t,{ il flMENT'BUffi,EA{JDENR Compound, Visayas Avenue, Diiiman euezon City 1 1 16Telephone Nos": (632) 927- 1517,928-J725; Fax No. (632) 920-2258
Website: http
D[f"'dR - Firfiq r R,{1".4
DIG0S, ilA.Vir* i"\*l_ StiilRECfi". i-].b LJlitT
DAr E llovffvUI
6 eota
A. SAJUL
we are pleased to invite you to attend the Public Hearing of the proposed cement GrindingFacility of the oro cemento Iniustries corpo""ur*-irre said hearing is scheduled on 16 November3:llrt['$]3;Hr'3fff, o.egtstririn srqrts at 8.00 am) atBarangay ;";;;s Murti-purpose center,
The Public Hearing will be conducted as part of the requirements of the proponent,s appricationfor an Environmental coripliance certificate (Ecci. irrt"r.rt"o parties will be given the opporrunity toexpress freely their conce*x/support/opposition/ qu"rtion, about the project.
Kindiy register in person or submitJour opinionG) tn a concise position paper to this office oremail it at eia@emu'gov'ptr on or before lj Novernb., iotg. Those *d;ii not be able to register orsubmit written positions may be given the opporturr,r;; Jliare their issues on the day of the hearing irself.
Herewith is the project's Executive-Summary for the public-(ESp) for your reference. The project,sEnvironmental Impact StaLment (EIS) is downloadable o, or* website:'www.emb.eov.nh (kindty accessthe Norice of Public Hearing/coisuliarion tinkfound ir rh;;";;;;;Am" of our v,eb pase)whirethe hard copies are availabre in this office, and in trr. roiro*ing offices:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy, 27_C,Davao City(082) 234_006t
2' Municipal Planning and Development Office (Santa CruzrDavao del Sur)Municipal Hall of Santa Cruz,Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tet. Nos. (02) 920_2240 to 41.
Sincerely yours,
BNGR.Chief, and
Pr ote ct tlt,e en t;i.r ott.m e.n,t. . . Fr ate ct life..
Division
-J7
Republic of the PhilippinesDepartment of Environment and Natural Resources
EI\IVIRONMENTAL MANAGEMENT BUREAUDENR Compound, Visayas Avenue, Diliman euezon City 11,16
Telephone Nos. : (632) 927 - 1 S1T, Q2B-37 25; Fax No. : (612) g2l' -2259
Website: http://www.emb. gov.ph
ocT 2 4 2018i.,,. :
0 6 Nov 2018
Kun_ 0. cDtovlb!4iN( effic€((ENt$ Uuos city
C0iDl,mL CDmlrDL4ft) . Utloo( c,,t.l\/
Dear vllr, f*r.0vttz
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacility of the Oro Cemento Industries Corporation. The said hearing is scheduled on 16 November2018 (Friday) at 9:00 AM (regtstration starts at 8:00 am) atBarangay Darong Multi-Purpose Center,Santa Cruz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent's applicationfor an Environmental Compliance Certificate (ECC). Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office oremail it at [email protected] on or before 13 November 2018. Those who will .roi b" able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearing itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. The project'sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.sov.ph (kindly i""uythe Notice of Public Hearing/Consultation linkfound in the lower right portton oJou, *"b po74 whilethe hard copies are available in this office, and in the following offices:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27-C,Davao City(082) 234-006r
2 Municipal Planning and Development office (Santa cruz,Davao del Sur)Municipal Hall of Santa Cruz,Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 4L
Sincerely yours,
ENGR. E A. SAJULChief, EIA
Protect the enuironment... Protect ltfe.
Division
jii:
i
l
l
l
ocT 2 4 ?019
HON. ALEXIS ALMENDRASMunicipal MayorMUNICIPAL LGU OF SANTA CRUZSanta Cruz Municipal Hall, Santa Cruz,Davao
Dear Hon. Almendras:
Republic of the philippinesDepartment of Environment and Natural Resources
E NVIR ONME NI'AL MANAGE MENT BUREAUDENR Compound,
Telephone Nos.: (632)
Avenue, Diliman euezon City 'tl'16
"SPBlgk oF T'Hfi MAY*RSTA, CRUT, DAV,,1O DFI- SUR
ffiffi#ffi#wffiffi
Sur
EY:
BATE:
T{tular
Sincerely yours,
ENGR.Chief, EIA and
0 R .si)Ewh,)
we are pleased to invite you to attend the Public Hearing of the proposed cement GrindingFacility of the oro cemento rniustries corporatiorr.-itre said hearing is scheduled on 16 November3:ilJ['$]3:f"'3fff, ft.egis*ation starts at 8'00 am)at Barangay 6u.org Muui-purpose center,
The Public Hearing will be conducted as part of the requirements of the proponent,s applicationfor an Environmental compliance certificate rBicl. rnt.."rt"o parties will be given the opportunity toexpress freely their concerns/support/opposition/ qu*rtio", uuoutihe proi".t.
Ifindly register in person or submitJo-ur opinion(s) in a concise position paper to this office oremail it at eia@emb'gov'ph on or before 13 Novemb., z'otg. Those who will not be able to register orsubmit written positions may be given the opporlunity to share their issues on th. day of the hearing itself.Herewith is the project's Executive-summary for the public_(ESp) for your reference. T'he project,sEnvironmental Impact.staiement (EIS) is downloadable on-our website: www,pmb.eov.nri (ktndly accessthe Notice of Public Hearing/coisuliation linkfound in the.lower righmn of our w,eb page)whilethe hard copies are available in this office, and in the following offices:
1. EMB Region XI3rd Avenue comer V. Guzman St., Brgy. 27_C,Davao City(082) 234_006t
2. Municipal pranning and Development-office (santa cruz,Davao del sur)Municipal Hall of santa c{uz,Davao del Sur vr qz' uqyau uEr Dury
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at tet. Nos. (02) 920-2240 to 41.
ZA A. SAJUL
Protect tlrc en.uirorument... protect life.
Division
OcT 2 4 2018
trrL<.J^/HD 4^Ury Ja.^
\-fry.A- oA+L
Repubiic of the phiiippinesDepartment of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAUDENR Compound, Visayas 11 16
Telephone Nos.: (632) 927-1517,
Website: OF THH ,VTAYORSTA. CRUZ, DAVAO D{L SLIR
ffiLJt,
ttAi[:x
Z/* )e /2r-L 6v TlfV'lF: -_ h: I
Dear /./?a
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacility of the Oro Cemento Industries Corporation. The said hearing isscheduled on 16 November2018 (Friday) at 9:00 AM (registration starts at 8;00 am) atBarangay Darong Multi-Purpose Center,Santa Crtz,, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent's applicationfor an Environmental Compliance Certificate (ECC). Interested parties will be gtr"n the opportunity toexpress freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office oremail. it at [email protected] on or before 13 Novemb er 2018. Those who witl ,oi Ui able to register orsubmit written positions may be given the opportunity to share their issues on the day of the heariig itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. The project,sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.gov.ph ftindiy i""r*the Notice of Public Hearing/Consultation linkfound in the loweruiglrt wiio; ofm6 poir) whilethe hard copies are available in this office, and in the following offices:
-
1. EMB Region XI3rd Avenue corner V. Guzman St,, Brgy. Z7-C,Davao City(082) 234-0061
2 Municipal Planning and Development Office (santa cruz,Davao del Sur)Municipal Hall of Santa Cruz. Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 4t.
Sincerely yours,
ENGR. A. SAJULChief, EIA
Protect the enuironment... Protect life..,
Division
Fax
-turaft
ocT 2 4 2018 ,rs'!0*fl|;H il;t,*o,.,',s' ffIti* * ffi rr rffi %
t;
x**#3jHrr,ffiJJtBt?rHrm oFFrcE,ffffi ffi
we are pleased to invite you to attend the Public Hearing of the proposed cement GrindingFacility of the oro cemento rniustries Corporation. ihe said hearing is scheduled on 16 Novernber2018 (Friday) at 9:00 AM (regtstration starts at 8;00 am)at Barangay Darong Multi-purpose center,Santa Cruz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent,s applicationfor an Environmental coripliance certificale fnicl. Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ qrertions about-the project.
Kindly register in person or submitJo-ur opinion(s) in a concise position paper to this office oremail it at eia@emb'gov'ph on or before 13 Novernb". z'0t8. Those who will not be able to register orsubmit written positions may be given the opporfunity io rir*" their issues on the day of the hearing itself.
Herewith is the project's Executive summary for the Public_(ESp) for your reference. The project,sEnvironmental lmpactstatement (EIS) is downloaiable on our website: www.emb,gov.prr (kirdty acces,sthe Notice of Public Hearing/consuliarion linkfound i" th;1r;;;;"rffin of our l,eb page)wrrilethe hard copies are available in this office, and In the folowing offices:
EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27_C,Davao City(082) 234-0061
1
Republic of the philippinesDepartment of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAUDENR Compound, Visayas Avenue, Diliman euezon City 1116
Telephone Nos.: (632) g2t-1517,928-3728:Fax No.: (632) 920-2258
Website: http:liwww,emb. gov.ph
Sincerely yours,
E
Municipal Planning and Deveropment oflice (santa cruzrDavao der Sur)Municipal Hall of Santa Cruz,Divao del Sur
For more details, please contact the Environmental Impact Assessment and Manageme,t Division(EIAMD) of this Office at Tet. Nos. (02) 920_2}40to 41.
2
Chief, EIA andA. SAJUL
Protect the enuironment... protect life.,,
l Division
RePublic of the PhiliPPines
Department of Environment and Natural Resources
$,1N"&r{E{&Nl5'[Hiq:[,4{,&{ANr-tGHlV[ENig]E{JKE&ilDENR Cornpound, Visayas Avenue, Diliman Quezon City 1116
Telephone Nr:s.: (632) 927 -1517'928-3725; Fax lio : (632) 920-2258
Website: httP:l/www'etrb'gov'Ph
MUNICIPAL ENGINEER'S OFFICE (MEO)Santa Cruz Municipal Hall, Santa Cruz, Davao del Sur
To the Municipal Engineer:
We are pleased to invite you to attend the Public Hearing of the proposed Cement Grinrling
F,acility of the oro Cemento Industries Corporation. The said hearing is scheduled on 16 November
2013 (i'rid ay) at9:00 AM (registration starts at 8:00 am) at Barangay Darong Multi-Purpose Centel'o
Santa Cruz, Davao del Sur.
The public Hearing will be conducted as part of the requirements of the proponent's application
for an Environmental Compliance Certificate (ECC). Interested parties will be given the opporlunity to
express freely their concerns/support/opposition/ questions about the project.
Kindly register in person or submit your opinion(s) in a concise position paper to this Office or
email it at [email protected] on or before 13 November 2018. Those who will not be able to register or
submit written positions may be given the opportunity to share their issues on the day of the hearing itself.
Herewith is the project's Executive Strmmary for the Public (ESP) foryour reference. 'fhe project'sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.gov.ph (kindly access
the Notice of Public Hearing/Consultation linkfound tn the lower right portton of our web page) whilethe hard copies are available in this Office, and in the following offices:
i. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27-C, Davao City(082) 234-006r
2. Municipal Planning and Development Office (Santa Cruz, Davao del Sur)Municipal Hall of Santa Cru4 Davao del Sur
For more details, please contact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 4t.
Sincerely yours,
,I Fingi rr*<+r''* Sf ,ri{:l',-rr,?. {-t ue, [-]av;,rr: cleli 5.il-ll ENGR. A. SA.IUL
xilu irq:';t;d .&.tChief, and
4-rtii:i -B
Pratect the eruuironment..". Fratect life.
l Division
RePublic of the PhiliPPines
Department of Environment and Natural Resources
EIqVIRONMEhTTAI, I\IANAGEMENT BURHAUDENR Compound, Visayas Avenue, Diliman Quezon City 1116
Telephone Nos.: (632) 927-1517,928-3725; Fax No': (632) 920-2258
Website: httP:l/www'emb.gov' Ph
.#L]T * .$ ilii*
MUNICIPAL HEALTH OF'FICE (MHO)/RURAI, HEALTH UNIT (RHU)
Santa Cruz Municipal Hall, Santa Crtlz, Davao del Sur
To the MHO/RHU:
We are pleased to invite you to attend the Public Hearing of the proposed Cement GrindingFacility of the Oro Cemento Industries Corporation. The said hearing is scheduled on L6 November2018 (Frid ay) at 9:00 AM (registration starts at 8:00 am) atBarangay Darong Multi-Purpose Center,
Santa Cruz, Davao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent's applicationfor an Environmental Compliance Certificate (ECC). Interested parties will be given the opportunity toexpress freely their concerns/support/opposition/ questions about the project
Kindly register in person or submit your opinion(s) in a concise position paper to this Office oremail it x [email protected] on or before 13 November 2018. Those who will not be able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearing itself.
Herewith is the project's Executive Summary for the Public (ESP) for your reference. The project'sEnvironmental Impact Statement (EIS) is downloadable on our website: www.emb.gov.ph (kindly accessthe Notice of Public Hearing/Consultation link found in the lower right portion of our web page) whilethe hard copies are available in this Offrce, and in the following offices:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. z7-C,Davao City(082) 234-006r
2. Municipal Planning and Development Office (Santa Cruz, Davao del Sur)Municipal Hall of Santa Cruz, Davao del Sur
For more details, please coitact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) 920-2240 to 4t.
Sincerely yours,
r WttP*\rfflTf
t{trllr o1+1)s 4o w>
ENGR.Chief, and
A. SA.IUL
pn
I!\tp
o- te Frotect tl"te en uiran nten.t.. " llra t ect life
Division
MUNICIPAL ENVIRONMENT AND NATURAL RESOURCES OFFICE (MENRO)Santa Cruz Municipal Hall, Santa Cruz,Davao del Sur
To the MENR Officer:
we are pleased to invite you to attend the Public Hearing of the proposed cement GrindingFacility of the oro Cemento rndustries corporation. The said hiaring is scheduled on I6 November2018 (Friday) at 9:00 AM (registration starts at 8;00 am) at Barangay ilu*orrg Multi-purpose center,Santa CruzrDavao del Sur.
The Public Hearing will be conducted as part of the requirements of the proponent,s applicationfor an Environmentai compliance certificate (EaC). lnterested parties will be given the opportunity toexpress freely their concems/support/opposition/ questions aboutihe project.
Kindly register in person or submit your opinion(s) in a concise position paper to tiris office oremail it at [email protected]'ph on or before 13 Novemb er ZOt8. Those who will not be able to register orsubmit written positions may be given the opportunity to share their issues on the day of the hearing itself,
Herewith is the project's Executive summary for the Public (ESp) for your reference. The project,sEnvironmental Impact Statement (EIS) is downloadable on our website: wwrv.emb.eov.ph (kindty .,cce'sthe Notice of Public Hearing/consultation link found in the toir, ,igt m" of our web page) whilethe hard copies are available in this office, and in the following offices:
1. EMB Region XI3rd Avenue corner V. Guzman St., Brgy. 27_C,Davao City(082) T4-A061
ocT 2 4 201&
2
Republic of the philippinesDepartment of Environment and Natural Resources
EhIVIRONIIIENTAL MANA"GEMENY BU&8,4"UDENR Compound, Visayas Avenue, Diliman euezon City 1116
felephone Nos,: (632) 927-1517,928-3725; Fax No.: (632) g20_22SS
Website: http:l/www.emb.gov. ph
Sincerely yours,
il .e ' lfliot/,On BNGR.Chief, and
Municipal Planning and Deveropment office (santa cruzrDavao del sur)Municipal Hall of Santa Cnrz, Davao del Sur
For more details, please coirtact the Environmental Impact Assessment and Management Division(EIAMD) of this Office at Tel. Nos. (02) g2O_2240 to 4t. r "-'-
[4EttlKo
A. SAJUL
aq7ut IL
D to bL,t-
o ls p lT\ Pratect tlze. en uiran.nt.erut. . . Protect life "
, .
Division
,,{
ATTACHMENT 3 PUBLIC HEARING ATTENDANCE SHEET
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY
BARANGAY DARONG, STA. CRUZ, DAVAO DEL SUR
ATTACHMENT 4 PUBLIC HEARING PRESENTATION MATERIAL
PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY
BARANGAY DARONG, STA. CRUZ, DAVAO DEL SUR
PUBLIC HEARINGFOR THE PROPOSED
SANTA CRUZ CEMENT GRINDING FACILITY
Date: November 16, 2018
Venue: Brgy. DarongCovered Court, Sta. Cruz, Davao del Sur
ORO CEMENTO INDUSTRIES CORPORATION
Programa para sa Public HearingORAS PAKSA/AKTIBIDAD RESPONSABLE
8:30am Rehistrasyon LCI
9:00am
Panalangin at Pambansang Awit BLGU Darong
Public Hearing at ang Philippine EIS System EMB-CO
Mga Panuntunan sa Pagsasagawa ng Public Hearing Public Hearing Officer
9:30am
Ang ProyektoLCI / Oro Cemento
Industries CorporationAng Isinagawang EIA para sa Proyekto
10:00am OPEN FORUMPublic Hearing Officer
1:00pmResulta ng Talakayan
Mga Susunod Na Hakbang EMB-CO
PUBLIC HEARING AT ANG PHILIPPINE EIS
SYSTEM
Engr. Jose Paolo Aragoncillo
Case Handler (Engineer II), EMB Central Office – EIAMD
Expansion / Project modifications
PROJECT SCREENING
ENVIRONMENTAL IMPACT MONITORING & EVALUATION /
AUDIT
ECC Issuance w/ recommendations to
other government entities
Secure permits / clearances from other DENR Units & Other GAs / LGUs
Implementation
Change Project plan /
Relocate Project
No EIA
DENIAL ECC
PUBLIC
INVOLVEMENT
EIA Required
Proponent Driven
DENR-EMB Driven
Proponent Options
Not Part of EIA Process
Public Involvement
LEGEND:
EIA Study / Report Preparation by Project Proponent
EIA SCOPING
REVIEW & EVALUATION of
EIA as facilitated by DENR-EMB
Public Hearing • Is designed to promote dialogue or
communication between and among the project proponent, the DENR and the public for the purpose of exchanging information and views about the proposed project.
• Is a formal process that is initiated, planned and conducted by the DENR.
Public Hearing• It provides a forum for the proponent and the
DENR to understand community values or needs and appropriately respond to them
•Serves as a venue to test alternative options for resolution of issues or conflicts.
Objectives and Purpose
•To provide a forum for the proponent to inform the entire community of the outcome of the Environmental Assessment of proposed undertakings;
Objectives and Purpose
•To verify the accuracy of the EIA findings in relation to the situation on the ground;
•To confirm that all the affected parties and stakeholders have been adequately consulted and have been part of the various decision-making processes;
Objectives and Purpose
•To offer the affected and interested parties, as well as other stakeholders, the opportunity to express their opinions on any issues considered outstanding; and
•To promote effective public participation and ensure confidence in the EIA process as well as support for the proposed undertaking.
MGA PANUNTUNAN SA PAGSASAGAWA
NG PUBLIC HEARING
Atty. Aime Rodaje
Public Hearing Officer for the Proposed Project
DENR-Central Office
Mga Patakaran sa Pagsasagawa ng Public Hearing
1. Ang public hearing ay gagawin sa Tagalog. Gayunpaman, maaari pa ringgamitin ang lengguwahe kung saan kayo mas kumportable.
2. Ang sinumang may gustong sabihin sa open forum ay dapat itaas angkanyang kamay upang mapayagang magsalita ng hearing officer. Ang mgakomento at suhestyon ay maaari ding isulat sa ipapamahaging papel atibigay sa tauhan ng DENR.
3. Gamitin ang mikropono sa pagsasalita sapagkat ang mga pangyayari ayitinatala.
4. Kung magsasalita sa unang pagkakataon, sabihin ang pangalan,opisina/organisasyon na iyong nirerepresenta at ang iyong posisyon.
Mga Patakaran sa Pagsasagawa ng Public Hearing
5. Ang mga magsasalita ay dapat bigyan ng kaukulang pansin ang nakalaang oras
Project Proponent – 10 minuto para ipaliwanag ang proyektoEIA Consultant/PP – 15-20 minuto para ipaliwanag ang mga natuklasan sa kanilangpag-aaralStakeholders/Concerned citizen – 2 minuto bawat isa
(ang sinumang gustong magsalita ng mas matagal upang ipresenta ang mgaimportanteng impormasyon gayundin ang mga nangangailangn ng mga gamit tulad ngprojector ay dapat magsabi sa hearing officer sa pamamagitan ng EMB personnel bagomagsimula ang open forum)
6. Lahat ng presentasyon at katanungan ay dapat maikli, malinaw at direkto. Iwasanang paggawa ng mahahabang pagsasalita upang magamit ng husto angpartisipasyon ng publiko at upang makamit ang objektib ng public hearing.
Mga Patakaran sa Pagsasagawa ng Public Hearing
7. Ang mga komento ay dapat gawin bilang kinatawan ng interes ng publiko athindi pansarili ng sa gayon ay nakapokus ang lahat sa isyung pinaguusapan.
8. Makinig sa taong nagsasalita at iwasan ang paggawa ng anumangnakakabulabog. Ano man ang nararamdaman tungkol sa sinasabi ng taongnagsasalita ay dapat itong ipagtimpi at hintayin ang pagkakataongmakapagsalita. Irespeto ang opinion ng iba at ang hindi pagsang-ayon aydapat isatinig ng maayos.
9. Ang hearing officer ay may karapatang palabasin ang indibidwal o grupo napatuloy na nakakagulo sa ginagawang hearing kung hindi pa rin ito tumigilmatapos bigyan ng tatlong babala ng Hearing Officer.
10. Kung maari ay tapusin ang Public Hearing at huwag munang umalis.
IMPORMASYON TUNGKOL SA PROYEKTO
PANGALAN NG PROYEKTO Santa Cruz Cement Grinding Facility
PROPONENT Oro Cemento Industries Corporation
URI NG PROYEKTO Cement (Clinker) Grinding Process
LAKI/KAPASIDAD2.0 Million Metric Tons per Year (MMTPY) Semento/50,000,000 Sako ng Semento
LOKASYON Brgy. Darong, Sta. Cruz, Davao del Sur
Layunin ng Proyekto
• Masuplayan ang pangangailangansa mga kagamitan sa konstruksyonbunga ng pagdami ng mgainvestments sa iba’t ibang sector ngbansa.
• Makakatulong din ang proyekto samga malalaking proyekto ngGobyerno mula sa “Build, Build,Build” program ng AdministrasyongDuterte.
Bahagi ng ProyektoPROJECT COMPONENT DESCRIPTION/SPECIFICATIONS
Raw Materials Storage Longitudinal storage with 50,000 MT capacity and with mechanical reclaimer
Clinker Storage 6 x 10,000 tons capacityDosing Silos 6 x silos with various sizes, with weigh feedersCement Mill 1 x 250 TPH Vertical Roller MillCement Storage 4 x 10,000 tons capacityCement Packing and Dispatch 3 x 90 TPH Rotary Packing machineWater Source 2 Deepwell Pumps (capacity: 110 cu.m./day)Air Pollution Control Bag FiltersWastewater Pollution Control Septic Tanks
Sewage Treatment PlantPier Facility (Common) Raw Material/Clinker Unloading & ConveyorSupport Facilities• Warehouses• Administration Building and Staff House• Parking and Truck Marshalling Area• Water and Wastewater Treatment Facilities• Clinic• Power Substation
Mga Gawain para sa EIA
Pre-Scoping
• Initial Site Visit at Koordinasyon sa Stakeholders
• Baseline Environmental Sampling Activities
• Information, Education at Communication
Scoping
• Public Scoping
• Technical Scoping
EIS
• EIS Preparation
• EIS Submission
• EIS Review at Public Hearing
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
LANDLAND USE AND CLASSIFICATIONImpact in terms of compatibility with existing land use
Ang proyekto ay itatayosa lugar na nakatalagabilang Industrial Zone saSta. Cruz, Davao del Sur
Pagpapanatili ng sapat nabuffer zone para mabawasan ang epekto samga katabing komunidad
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
LANDLAND USE AND CLASSIFICATIONImproper solid waste management and other related impacts
Pagkakaroon ng basurasa pagtayo at paggawang planta
Pagpapatupad ng Solid Waste Management Plan alinsunod sa umiiral nasistema sa bayan ng Sta. Cruz
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
LANDPEDOLOGYSoil erosion/Loss of topsoil
Soil erosion dulot ng site development
Paglilimita ng earth movementPaglagay ng silt trap or settling pond
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
WATERWATER QUALITY Degradation of ground water / coastal water quality
Kontaminasyon dulotng hindi tamangpagtapon ng waste water
Paglalagay ng sanitation facilities para sa mga manggagawa (hal. palikuran, paliguan, atbp.)Oil water separator
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
AIRAMBIENT AIR QUALITY AND NOISEImpact on Air Quality Emisyong NOx, SO2, at CO mula
sa heavy equipment nagagamitin sa konstruksyon ng proyekto
Maayos na maintenance sa heavy equipment
Emisyong TSP at PM10 emissions mula sa cement grinding facility
Paglalagay ng bag filters na kayangsumagap ng 90% ng emisyon mulasa cement grinding facility
Pagdidilig ng kalsada sa loob ng planta para ma-control ang alikabok
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
AIRAMBIENT AIR QUALITY AND NOISEIncrease in Ambient Noise Level
Ingay mula sa heavy equipmentsa konstruksyon ng proyekto
Ang cement grinding facility aymagdudulot ng ingay
Maintenance ng makina at ibapang mekanikal na parte ng mgakagamitan
Paglalagay ng exhaust mufflers
Paggawa ng enclosures napapalibot sa project site
Maintenance ng vegetation nanakapalibot sa project area bilangnatural na pananggalang sa ingay
POTENSYAL NA EPEKTO
DESKRIPSYON MITIGATING MEASURES
PEOPLETraffic Congestion Trapik dulot ng pagdami ng
trucks na babaybay sa loob atlabas ng planta
Koordinasyon sa LGU ng Sta.Cruz tungkol sa tamang pag-manage ng trapik malapit saproject area
Paggawa ng private road upanghindi magamit ang barangayroad
IBA PANG MGA ISYUNG NATALAKAY
MULA SA MGANAKARAANG
KONSULTASYON
Engr. Jose Marie Lim
EIA Consultant Team Leader
ISSUES/CONCERNS/SUGGESTIONS
RAISED BY PROPONENT/EIA CONSULTANT RESPONSES
LAND, WATER AND AIR• Ang foreshore lease
application ay kinakailanganpara sa proyekto.
Ms. Aida Bautista(PENRO DMO)
Sa kasalukuyan, mayroong aplikasyonng foreshore lease application ang proyekto.
• Ang marine ecosystem ay kinakailangang pag-aralangmaige, lalo na ang malapit saport facility.
Base sa aming isinagawang marine assessment, walang tatamaangmarine resources (corals, seagrasses, etc.) sa alignment ng pier.
ISSUES/CONCERNS/SUGGESTIONS
RAISED BY PROPONENT/EIA CONSULTANT RESPONSES
PEOPLE AND OTHER ENVIRONMENTAL CONCERNS• Restriksyon sa pagpasok sa
baybayin sa tapat ng proyektokapag nag-operate na angplanta.
Mr. Jamil Onutan(BFARMC)
Base sa mga pag-uusap na ginawa para samga mangingisda, malayo ang lugar ng pangisdaan nila sa lugar na pagtatayuanng proyekto.
Maaari paring makadaan ang mgamangingisda, ngunit hindi itonirerekomenda, para na rin sa kanilangkaligtasan.
• Paggamit ng barangay road ngmga trucks.
Ms. Juvy Caballero(Brgy. Kagawad)
Hindi gagamitin ang barangay road, dahilmagkakaroon ng private road ang mgadelivery trucks papasok at palabas ng planta hanggang sa National Road.
ISSUES/CONCERNS/SUGGESTIONS
RAISED BY PROPONENT/EIA CONSULTANT RESPONSES
PEOPLE AND OTHER ENVIRONMENTAL CONCERNS• Pagkakaroon ng Batch 2 ng site
visit sa cement plant ni SMC.Mr. Hakim Lalang (Brgy. Kagawad)
Ang pangalawang batch ng site visit para sa mga bagong barangay officials ay isasagawa base sa mapapagkasunduangschedule.
ISSUES/CONCERNS/SUGGESTIONS
RAISED BY PROPONENT/EIA CONSULTANT RESPONSES
PEOPLE AND OTHER ENVIRONMENTAL CONCERNS• Lugar ng pagtatayuan ng
barangay high school.Mr. Jerry Tumala(Brgy. Captain)
Pinagaaralan parin ang lugar kung saan pwedeng ilagay ang barangay high school.
• Pagbibigay priyoridad satrabaho at livelihood activities para sa Brgy. Darong.
Ang mga kwalipikadong residente ng barangay Darong ay bibigyangpriyoridad sa trabaho at livelihood activities.
ISSUES/CONCERNS/SUGGESTIONS
RAISED BY PROPONENT/EIA CONSULTANT RESPONSES
PEOPLE AND OTHER ENVIRONMENTAL CONCERNS• Patrol boat para sa mga
aktibidad ng Bantay Dagat.Mr. Jamil Onutan(BFARMC)
• Ito ay maaaring mailagay naprograma sa CSR ng OCIC.
Proponent’s Commitment sa EIS• Susundin ang mga kondisyon na
nasasaad sa EIS, ECC, at kaugnay na mgabatas;
• Pagtitibayin ang ugnayan sa apektadongkomunidad;
• Itataguyod ang sustainable atresponsableng paggamit ng likas-yamanat angkop na teknolohiya;
• Maglulunsad ng programangmakaaambag sa pagpapaganda ngkalidad ng buhay sa komunidad;
• Magsasagawa ng programangmakatutulong sa kahandaan ng mgamanggagawa sa planta na gampanannang maayos ang kanilang mga trabaho;at
• Magpapatupad ng grievance redressmechanism na pangangasiwaan ngEnvironmental, Health, and SafetyOfficer.
Kung may nais iparating natanong/saloobin, makipag-ugnayan
lamang po sa:
Unit 8L-M Future Point Plaza 3
111 Panay Avenue, Quezon City
Telepono: (02) 442-2830
EMB Building, DENR Compound
Visayas Avenue, Quezon City
Telepono: (02) 920-2240 to 41
SMC Head Office Complex
San Miguel Avenue, Mandaluyong City
1603 Metro Manila, Philippines
DENR-EMB CENTRAL OFFICE
ORO CEMENTO INDUSTRIES CORPORATION
ATTACHMENT 5 TRANSCRIPT OF THE PUBLIC HEARING
PROCEEDINGS PROPOSED SANTA CRUZ CEMENT GRINDING FACILITY
BARANGAY DARONG, STA. CRUZ, DAVAO DEL SUR
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 1 of 12
PUBLIC HEARING
<START OF TRANSCRIPT>
PH OFFICER: At this point, bibigyan po natin kayo ng pagkakataon na
sabihin ang inyong katanungan. Subalit, kailangan munang tandaan ang
mga rules ano po? Iwasan po natin ang mainit na pagtatalo. Yung mga
masasakit po na pananalita, maiinit na argumento, iwasan po natin yun.
Kasi po, makukuha naman po yun sa mahinahon diba? Yung mga katanungan
po nila, dapat po, connected sa proyekto. Wag po tayong magtanong ng
mga bagay na hindi konektado sa pinopropose po ng proponent.
Kung sakali po, nakiki-usap po kami sa inyo, na yung nabanggit nan a
tanong, wag na po nating ulitin, kasi po, masasayang po ang oras po.
Bago po magsalita, sabihin po yung pangalan, barangay, organisasyong
kinabibilangan. Kung nahihiya po kayo, ako po ang lalapit sa inyo.
Kung sakali po, may papel po kami para duon niyo po isulat ang mga
katanungan niyo at babanggitin po naming iyon.
Hinihikayat po naming kayo mga kaibigan na sabihin niyo po yung mga
saloobin na to sa oras na ito. Sige sir?
PUBLIC: Magandang umaga sir/ma’am, isa po akong barangay Tanod. Hindi
ako anti-proyekto, natutuwa kami na malaman na ang mga pangamba ng
mga tao, na hindi makasama sa katawan ang alikabok. Sa nakita namin
kanina, okay ang project niyo. Dahil may pollution control. Kung may
polusyon, merong solusyon. Wala naman pangamba na ang mga tao dito.
Pag may nakita kaming lumilipad na mga alikabok, i-report namin sa
barangay, para aksyon agad. Dun sa facility, klarong klaro naman na
meron kayong solusyon sa mga polusyon mula sa project.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 2 of 12
PH OFFICER: Maraming salamat po sir, noted po lahat ng sinabi nila.
Pwede niyo pong sabihin sa inyong diyalekto, meron po kaming
translator galing sa EMB Region XI.
PUBLIC: Maayong buntag sa tanan! Ako po si <inaudible> ng DENR CENRO
Digos, I’m here to listen and document the presentation of Oro Cement.
Sa report po, sa project proposal list, dapat sana, may visual, dahil
hindi namin alam yung itatayo. Sana yung next, visualize. Kasi, gagawa
tayo ng cement grinding, anong klase yun? Hindi naming alam. Sample
yung image. Sa coastal, yung environment adviser, in your own, sa
company. Para wala tayong duplication, sana mag invite kayo sa DENR
Regional. Para malaman natin kung ano ang masisira. Kasi sa report
niyo, may corals. Sana sa pag-validate, may recommendation sana yung
coastal namin. In the long run, hindi natin ma-iiwasan na may
maapektuhang community, lalo na yung mga mangingisda. Kung may mag-
complain, ofcourse, i-eentertain namin yan. Huwag naman sana tayong
umabot sa punto na yun. Suggest lang po sir, na gagawa kayo sa regional
office, sa coastal management division, para magkaroon ng validation
sa site niyo, kasi may terms and conditions tayo jan. Yung coastal
expert namin sa region, alam nila yung dapat gawin. Yung sa greening,
salamat po sa company, para maminimize natin yung air pollution, kung
may air pollution. Of course, ang suggest ko lang, yung itanim niyo,
in-favor of the community. Kung gusto niyo talagang makatulong sa
community, of course, yung mga high valued crops like manga. For
protection purposes, forest trees like mahogany and narra. Yung sa
solid wastes, gagawa kayo ng solid waste management plan. I-susubmit
niyo sa DENR at MENRO, at least, pag mag-operate kayo, yun yung
susundin namin. That is all. Thank you!
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 3 of 12
PROPONENT: Sir, regarding po sa mga itatanim sa buffer zone, yung
itatanim namin ay protection. Gagawa kami ng plano para sa mga
appropriate trees. May plano na magtanim ng macopa, sabay sa pag-
construct.
PH OFFICER: Sir, yung ibang suggestion po kanina, noted po lahat yun.
Then yun sa validation po ng mga corals. Another question po?
PUBLIC: Sanitation Inspector, Sta. Cruz, sa diniscuss ni sir kanina,
madami tayong maiingay na equipment na mag-ooperate ng 24 hours. Ano
po ba yung mga mitigating measures, kasi sa pagkakaalam ko, hindi
pwede na throughout the day, yung decibels ay pantay-pantay. Baka
pwede natin i-discuss. Salamat po!
PROPONENT: Yung equipment natin, talagang nag-poproduce ng noise, may
mga iba’t ibang klase ng paraan para mapababa ang noise. No. 1, sa
building palang, kapag nilagyan natin ng pader, naaatenuate na yung
noise. Pangalawa, bukod sa enclosure, ilalayo natin sa bakod. Para
mas malaki ang ibaba sa ingay. Ngayon pa lang, base sa NPCC guidelines,
meron pong standards sa daytime at nighttime, sisiguraduhin natin na
yung sa monitoring nila, kapag nanjan na yung planta, hindi tayo nag-
eexceed sa noise level requirement. Meron tayong mga ganung
pamantayan. We are aware of that, in fact, nasa report yung mga decibel
limits na kelangang i-maintain. During the air sampling, kumuha rin
tayo ng noise levels noon. So, may profile na tayo ng noise sa area.
Kaya nga po nilayo yung mga equipment during the design ng planta.
Syempre, ayaw naman natin na habang natutulog kayo, may naririnig
kayo. Sa totoo nga, yung staff house nila, ilalapit sa community.
PH OFFICER: Salamat sir Joma, sana nasagot yung katanungan nila.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 4 of 12
PUBLIC: Isa pa po, yung sa health, municipal health office po, sa dust
naman po, 24 hours operation, and yung mitigating measures natin ay
yung bag-filter at greening. Sir, hindi ba kayo magkakaproblemasa
greening, kasi katabi niyo yung feedmill? When we conducted the
coordination meeting with feedmill last Monday, dinidiscourage nila
yung greening, kasi it will attract birds that might create
biosecurity problem for them. Greening is good for you, pero sa kapit
bahay niyo, magkakaproblema sila. I-protect lang natin yung mga
recipient.
PROPONENT: Yung hopper natin, vacuum sealed, para hindi na maka-eskapo
yung alikabok. We assure you that hindi kami mag-ooperate kapag may
problema ang planta.
PH OFFICER: Sir, yung tanong po niya regarding sa feedmill.
PROPONENT: Tungkol po sa sinasabi sa feedmill at saka sa cement plant,
as much as possible, ang ilalagay pong puno ay hindi namumunga. Yung
lahat ng bodega ng feedmill, nakasarado po yun. Iiwasan din po natin
na pumasok yung mga ibon. Pag-uusapan din po namin ito ng feedmill,
para ma-address yung sinasabi niyong issue.
PUBLIC: Good morning po, Darong high school, we are very happy na
mabigyan na rin ng pansin yung kinakailangan naming lupa para sa high
school. Nakakalungkot lang, kasi it was announced sa scoping, tapos
ngayon, na-mention ulit. May mga tao ng member ng SMC na tinatanong
po namin, nakakalungkot po yung sagot na hindi po naming alam, at wala
daw pong document na will justify na yung community has a request for
the lot for the high school so nalungkot po kami. In fact, yesterday,
nag-hahanap po kami ng document na it will prove na may mga promises
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 5 of 12
na nangyari. May mga minutes po na nangyari po ang mga pag-uusap for
the Darong high school. Kasi yung sa Darong high school po, we really
need that, at urgent po iyon.
PROPONENT: Totoo po yun, napag-usapan sa mga dating scoping yun. Yung
narecommend po namin na lugar malapit po sa <inaudible>. Kaya ang
advise ng management, look for other areas, as much as possible, huwag
malayo, para sa mga bata. Para hindi tayo magkaproblema. So, ang
suggestion natin, ihanap ng lugar, given yung ibang areas na hindi pa
namin pag-aari. Huwag kayong mag-alala, at tutulungan namin kayo
tungkol dun.
PH OFFICER: Okay po? Sir?
PUBLIC: Thank you po for that, and we are looking forward na mangyari
po ito this year. Okay po, yung concern is yung environmental, yung
mga sampling, ang tanong ko po, saan po ba ma-aaccess ang data na ito.
PROPONENT: Sasabihin ko nga po kanina, yung kabuuan ng report,
accessible po siya sa EMB website. Kasi po, bago tayo nag-conduct ng
public hearing, naka-upload po yung file. Kasi po, may policy si EMB
ngayon, na lahat ng report na i-susubmit sa kanila ay i-uupload. Even
po yung certificate of analysis. Nasa tarp din po kung saan niyo
kukunin. Although, draft pa po iyon, and bago nila i-approve yung ECC,
i-uupload nanaman po ulit iyon.
PUBLIC: Pwede pong makasuggest din na, bigyan yung barangay Darong
for easier access. From time to time, kapag nag-operate na yung planta,
hindi maiiwasan yung mga parents namin na magtanong, so for easier
access po, I suggest meron po sa barangay.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 6 of 12
PH OFFICER: Noted po yun sir, makipag-coordinate po kayo sa local
government sa barangay.
PUBLIC: Good morning, I’m <inaudible> from the planning office. Ang
tanong ko lang sir, nagpresent kayo kung ano yung about sa monitoring
sa air, water at solid waste. Gusto namin malaman yung talagang result,
kasi teknikal yun. Sa level namin, meron na kaming kaunting kaalaman.
Maganda po siguro na meron tayong 1 meeting para ma-coordinate namin
sa mga barangay officials kung ano talaga ang result. Third party ang
kumuha ng data, so parang transparent lang for the community. Para
may interaction sa result. Ang gagawin natin ay baseline, so may
monitoring kayong gagawin every quarter. Kailangan nating malaman yung
mangyayari sa future at commitment sa community. Yung sa zoning
classification niyo sa lupa, nakalagay yan sa agricultural, pero
pwedeng gawing industrial, pero hindi pa siya na-approve. Yun lang
sir, thank you!
PH OFFICER: Si Sir Jolo (EMB) po muna ang mag-eexplain about sa MMT.
CASE HANDLER: Yugn tungkol po sa multi-partite monitoring team (MMT),
base po sa aming DAO, yung public participation natin for
Environmentally Critical Projects, ay mangangailangan ng MMT. Ang MMT
po ay ma-eestablish kapag na-issuehan na sila ng ECC. Yung mga
representatives po mula sa LGUs, communities, and based na rin po sa
bagong DAO, DENR CENRO at PENRO. Ang MMT po yung monitoring arm ng
EMB. Sila yung katulong sa pagvavalidate dun sa mga kinonduct na
monitoring activities ng proyekto, at kung nag cocomply po sila sa
conditions naka-impose po sa ECC nila. Including yung mga monitoring
plans at kung effective po ba.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 7 of 12
PUBLIC: The result of the study should also be presented not only to
the officials but to technical persons in the local government unit.
I am the MPDC. We wish that we can find time to study the EIS. We will
also discuss this with the members of the academe. Our vision for the
next 9 years, that our development should have ecological one. It
should not be about economic development only. It should be
sustainable and have ecological balance. <inaudible>. We can explain
to the people, the process, para kung ano yung mangyayari yung
community. How I wish that the presentation of the process flow. We
have to this presentation. Yung process talaga. Also, we have to sit-
down regarding the road network. Maybe the provincial and municipal
government for the road. That we should know so we could integrate it
in our plans.
PROPONENT: Noted po, maraming salamat po MPDC. Maganda po yung
suggestion niyo about sa pag-disclose, but we have to consult this
with the EMB also, kasi nasa proseso kami ng review. Kung ang i-iissue
samin regarding sa IEC, specifically for the LGU and BLGU to discuss
the information. Nothing will prevent you for asking this to Oro. Yung
process flow and road networks will be discussed with you, so thank
you po.
PH OFFICER: Tuloy-tuloy naman po yung communication nila sa inyo, and
yung lahat ng issues na i-reraise ay noted naman po.
PUBLIC: Member ng Lupon <inaudible>. Facility o planta? Facility yung
tawag? Yung sa FLA, how many years yung lease?
PROPONENT: On-going po yung application for FLA. Yung sa watershed
protection, that will be part of the CSR and also yung greening
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 8 of 12
program. Yung 110 cu. m., that is the rated po, but the requirement
of the plant is maliit lang, wala pong 30 cu. m., so maliit lang po.
Limitado lang po yung water requirement ng planta, because this is a
dry process. Nakalagay po sa report natin kung ilan po yung tubig na
kekelanganin.
PH OFFICER: Sasagutin din daw po ni sir (CENRO) yung question ni sir.
PUBLIC: Sir, tulong lang po ito sa company, to make it clear, sa FLA,
may application po yung SMC sa CENRO Digos, kung ilang years po yung
foreshore, 25 years po yan – renewable po yan. As long ang ma-meet
nila yung condition sa FLA, bayaran nila, may mga terms and conditions
yan sa contract. And then sa watershed po, mapansin po natin na yung
Oro Cemento Company, wala po sa taas, nasa lowland po siya. Mas dapat
po pagtuunan yung coastal resources. Its up to the company kung
magbibigay sila ng tulong or suporta sa watershed programs. Yung sa
soil sampling, that’s the time po na magkakaroon ng MMT. Titignan
natin yung commitment ng company – magbibigay sila ng data. Gusto ko
lang po ma-claro.
PH OFFICER: Maraming salamat po sa information! May mga tanong pa po
ba?
PUBLIC: Point of clarification, may mga nakausap po kami na yung nag-
pepresent daw is not an employee of Oro Cemento. Kasi hindi po namin
alam yung empleyado ng Oro Cemento.
PROPONENT: Nagpakilala po kami kanina. Kami po yung consultant.
PUBLIC: Hindi daw po kasi valid yung commitments, kasi hindi po kayo
tiga-SMC, yung nag-hahandle ng public scoping ay not from Oro.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 9 of 12
PH OFFICER: Si Sir Joma po, ay yung consultant na nag-conduct ng
study. May mga clarifications pa po ba?
PUBLIC: During the time na mag-operate na yung planta, makakadaan po
ba kami sa pier?
PH OFFICER: Actually, prinesent napo kanina, pero i-clarify po ulit
ni Sir.
PROPONENT: Butas po yun no, makakalusot po kayo. Kaya lang po, pag-
uusapan din po natin later, dahil may mga safety procedures po tayo
sa planta, lalo na kapag nanjan yung barko. For safety reasons. More
than us, mas alam niyo po yung condition ng dagat.
PUBLIC: Maayong buntag! Ako po ang Brgy. Captain ng Darong. Direct to
the point sir, gusto lang po naming sa council <inaudible>, gusto sana
namin i-visit namin yung lugar na may katulad nung sa gagawin project.
PUBLIC: Yung sinasabi ni kapitan, that was already presented during
the public scoping. Wherein, they will be going to similar projects
in other places, so they can appreciate the project. Binabalik lang
po ni Kapitan.
PROPONENT: Nag-organize na po ng plant tour sa previous barangay
officials. Nagkataon lang po na napalitan po sila, at ipaparating po
natin ito. Pero, wala pa po yung public scoping natin dati, i-ninitiate
na nung kumpanya yung pagdala sa ating mga officials sa planta.
Siyempre, naiintindihan ko po na bagong set tayo. Kaya po, ipaparating
natin ito sa management.
I-clarify ko lang din po na kami ay consultant, at EIA preparer lang
po kami. So, we actually have a direct connection to the client. So
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 10 of 12
nakaka-communicate po kami. Wala po kaming power. Ang pwede lang po
naming magawa ay maisulat yung mga recommendations namin.
PH OFFICER: Sir, lahat naman po ng usapan dito ay Documented naman
po.
PUBLIC: Ma’am, kasi ganito ang nangyari jan, so yung President po,
hindi naman tayo against sa project. Ang gusto lang naming mangyari,
Makita yung lugar. Maraming salamat po!
PUBLIC: Maayong buntag sa tanan, salamat po na na-mention ni sir yung
sa environmental. Salamat at may team na mag-momonitor. Sino ba yung
mga representatives ng MMT?
PH OFFICER: Jolo, can you answer the question?
CASE HANDLER: Composition po ng MMT natin ay maximum of 10. Composition
po ng MMT natin ay representatives ng barangay officials, MENRO/CENRO,
RHU, LGUs, representatives ng other government agencies na may mandato
sa kanilang proyekto. By virtue na rin po ng DAO 2018-18 na miyembro
rin po yung MMT yung representatives po ng DENR.
PUBLIC: Saan po yung location talaga ng planta?
PH OFFICER: Sir, sino po yung sasagot? Actually po kanina, pinakita
na po kung saan yung magiging location ng project.
PROPONENT: *Shows the project location and area*
PUBLIC: Good morning, school head po ng Darong high school. Last
scoping po kasi, last July. Yung mga heads po namin, nagbigay sila ng
budget for the new school building. Ngayon po, nagfofollow-up po sila
kung ano daw po yung linya ng oro cemento. Kasi, lalagpas nanaman po
yung budget. I hope you know what I mean.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 11 of 12
PROPONENT: Maraming salamat po. Actually sir, may na-identify na kami
na location. Nagkaroon ng deliberation na yung area, hindi dapat duon
yung school. So, naghahanap kami ng lugar, baka may marerekomenda
kayo, titignan namin kung pwede. Kasi sa ngayon, wala kaming area na
pwedeng magamit.
PH OFFICER: Sir, tulungan na lang po. Baka may pwede kayong i-recommend
na area.
PUBLIC: Sa ngayon po, may na-identify kaming lupa na hindi masyadong
malayo sa elementary school. Yun po yung area nila <inaudible>. Tapos,
mga 2 hecatares po yun.
PROPONENT: I-check po natin yung documentation nung area. Tapos, kung
okay po, ipapa-approve naming sa management. Yung area requirement
niyo, gusto lang din naming malinawan, kasi masyadong malaki yung 2
hectares, para sa 3 rooms.
PUBLIC: Yung school na itatayo is for junior and senior high school.
Yung sa amin po, yung lupa namin is around 2.6 hectares.
PROPONENT: Gusto lang din malaman, especially yung data natin.
PUBLIC: So far po, mga 60 students pa lang. Pero mag-dodoble doble po
yun.
PH OFFICER: Sige po, pag-usapan na lang po ito sa ibang araw. Okay
po?
PUBLIC: Concern lang po ako sa dagat, diba mag-gamit kayo ng barko,
pano kung magdulot po yun ng oil spill or marine pollution. Kasi, yung
mga tao jan, duon naliligo.
TRANSCRIPT OF THE PUBLIC HEARING PROCEEDINGS
Santa Cruz Cement Grinding Facility Project Venue: Covered Court Brgy. Darong, Sta. Cruz, Davao del Sur|Date:16 November 2018
Page 12 of 12
PROPONENT: Salamat po sir, naka-incorporate po yung oil spill
management at emergency response kung sakaling magkaroon ng oil spill
sa report. Yung plano natin is kausapin din later.
PUBLIC: Sir, tanong ko lang po kung may statistics kayo for the noise?
So sir, anong decibels po ba, meron po ba kayo? Maka-affect po ba?
PROPONENT: Naka indicate po yun sa report, yung statistics about sa
noise.
PUBLIC: Sir, sa data po ng air quality, particulars po, microns po?
So sa air po, can we guarantee that walang carcinogens sa products
ninyo? I just want to clarify this, as the project may cause problems
sa health ng community.
PROPONENT: Wala pong known carcinogens sa semento.
PH OFFICER: Basahin ko lang po yung tanong, may suggestion po na kung
pwede, palitan yung name ng project, magiging Darong po.
PH OFFICER: *Recapitulation of the public hearing proceedings*
PH OFFICER: Okay, kung wala na pong tanong, isasara na po natin ang
public hearing.
<END OF TRANSCRIPT>