Proposed Affordable Group Housing Project“Chandra

14
Proposed Affordable Group Housing ProjectChandra Kanta Residency at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh. By M/s. Luxmi Infrahome Pvt. Ltd. FORM - 1 Page 1 FORM - 1 i. Basic Information Sl. Item Details 1 Name of the project/s An Affordable Group Housing Project Chandra Kanta Residencey” by M/s LUXMI INFRA HOMES PVT. LTD. at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa.Distt. Hapur ,Ghaziabad , Uttar Pradesh. 2 S.No. In the schedule The project is categorized as B & item 8 (a) of Schedule - Gazette Notification dated Sep 14, 2006 and subsequent amendments issued by MoEF, New Delhi. 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled Total Plot area 21509.80 sqm Net Plot Area- 19830.62 sqm Total Green Belt Area- 2975.00 sqm (15% of Net Plot Area) Built-up Area- 25274.28 sqm Ground Floor Covered Area- 6292.32 sqm Total Commercial Area-105.0 sqm Road/Open Area- 13433.3 sqm 4 New/Expansion/Modernization New Project Affordable group housing 5 Existing Capacity/Area etc. NA 6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), Category B (Building and Construction Project) 7 Does it attract the general condition? If yes, please specify. No 8 Does it attract the specific condition? If yes, please specify. No 9 Location Pilkhuwa Plot/Survey/Khasra No. Khasra No; 528, Village Mirapur Pilkhuwa Khasra map Annexure-1 Village Mirapur Tehsil Dhaulana District Hapur State Uttar Pradesh 10 Nearest railway station/airport along with distance in kms. Ghaziabad Railway Station 4KM (S) 11 Nearest town, city, district headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, Muncipal corporation, Local body (complete postal addresses with telephone nos. to be given) Ghaziabad Development Authority (GDA). 13 Name of the applicant Mr.Manoj Kumar Goel 14 Registered address C5/10 Krisna nagar Delhi east Delhi 110051 15 Address for correspondence C5/10 Krisna nagar Delhi east Delhi 110051 Name Mr.Manoj Kumar Goel Designation (Owner/Partner/CEO) Owner Address C5/10 Krisna nagar Delhi east Delhi 110051 Pin Code 245304

Transcript of Proposed Affordable Group Housing Project“Chandra

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 1

FORM - 1

i. Basic Information

Sl. Item

Details

1 Name of the project/s An Affordable Group Housing Project “Chandra Kanta

Residencey” by M/s LUXMI INFRA HOMES PVT. LTD. at

Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur,

Pilakhuwa.Distt. Hapur ,Ghaziabad , Uttar Pradesh.

2 S.No. In the schedule The project is categorized as B & item 8 (a) of Schedule -

Gazette Notification dated Sep 14, 2006 and subsequent

amendments issued by MoEF, New Delhi.

3

Proposed capacity/area/length/tonnage

to be handled/command area/lease

area/number of wells to be drilled

Total Plot area – 21509.80 sqm

Net Plot Area- 19830.62 sqm

Total Green Belt Area- 2975.00 sqm (15% of Net Plot Area)

Built-up Area- 25274.28 sqm

Ground Floor Covered Area- 6292.32 sqm

Total Commercial Area-105.0 sqm

Road/Open Area- 13433.3 sqm

4 New/Expansion/Modernization New Project Affordable group housing

5 Existing Capacity/Area etc. NA

6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), Category B

(Building and Construction Project)

7 Does it attract the general condition?

If yes, please specify.

No

8 Does it attract the specific condition?

If yes, please specify. No

9

Location Pilkhuwa

Plot/Survey/Khasra No. Khasra No; 528, Village Mirapur Pilkhuwa

Khasra map – Annexure-1

Village Mirapur

Tehsil Dhaulana

District Hapur

State Uttar Pradesh

10 Nearest railway station/airport along

with distance in kms. Ghaziabad Railway Station –4KM (S)

11

Nearest town, city, district

headquarters along with distance in

kms.

12

Village Panchayats, Zilla Parishad,

Muncipal corporation, Local body

(complete postal addresses with

telephone nos. to be given)

Ghaziabad Development Authority (GDA).

13 Name of the applicant Mr.Manoj Kumar Goel

14 Registered address C5/10 Krisna nagar Delhi east Delhi 110051

15 Address for correspondence C5/10 Krisna nagar Delhi east Delhi 110051

Name Mr.Manoj Kumar Goel

Designation (Owner/Partner/CEO) Owner

Address C5/10 Krisna nagar Delhi east Delhi 110051

Pin Code 245304

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 2

Sl. Item

Details

E-mail [email protected]

Telephone No. 91-9810121398

Fax no. -

16

Details of Alternative sites examined,

if any. Location of these sites should

be shown on a toposheet.

No site alternatives are under consideration.

17 Interlinked projects Nil

18

Whether separate application of

interlinked project has been

submitted?

N.A.

19 If yes, date of submission N.A.

20 If no, reason N.A.

21

Whether the proposal involves

approval/clearance under: If yes,

details of the same and their status to

be given.

(a) The forest (conservation) Act,

1980?

(b) The wildlife (protection) Act,

1972?

(c) The C.R.Z. Notification, 1991?

No

No

No

22

Whether there is any Government

order/Policy relevant/relating to the

site?

The site has been earmarked for Residential purposes as per

Master Plan 2021 of Hapur Pilkhuwa Development Authority

(HPDA).

23 Forest land involved (hectares) No

24

Whether there is any litigation

pending against the project and/or

land in which the project is propose to

be set up?

(a) Name of the court

(b) Case No.

(c) Orders/directions of the court, if

any and its relevance with the

proposed project.

No litigation is pending against the project or the project land

in any court of law to the best of knowledge.

ii. Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 3

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

1.1 Permanent or

temporary change in

land use, land cover or

topography including

increase in intensity of

land use (with respect

to local land use plan)

No The proposed project envisages no change in land use as the area

has been earmarked for residential purposes as per the master

plan 2021 of Hapur Pilkhuwa Development Authority (HPDA).

Hence proposed project do not anticipate any further permanent

or temporary change in land use of the area.

1.2 Clearance of existing

land, vegetation and

buildings.

Yes Very small vegetation like Parthenium and Doob grass.

1.3 Creation of new land

uses?

No The site has been earmarked for Residential purpose as per

Master Plan 2021 of Hapur Pilkhuwa Development Authority

(HPDA).

1.4 Pre-construction

investigations e.g.

bore holes, soil

testing?

No There will be no physical impact on the locality due to the soil

testing or other pre-investigations.

1.5 Construction works? Yes The project includes the construction of 528 residential

apartments, commercial shops and a school, Project brief is

as follows:

Area under construction site :

S. No. Items Details

(sq m)

A Plot Area 19830.62sqm B Residential Built-up area 25169.28sqm C Basement Built-up area 00.00 sqm D Commercial Built-up area 105.00 sqm E School Built-up area 500.00 sqm

Area under Build up:

Description Area

Plot area 21509.80 Sqm

Area under Master Plan Road 1679.18 Sqm

Area Under chak Road 00.00 Sqm

Net Plot Area 19830.62 Sqm

Less 15% green Area 2975.00 Sqm

Net Plot Area 16855.62 Sqm

Permissible Area 2.50 Sqm

Available Area 79580.76 Sqm

Build-up Area 79580.76 Sqm

Balconies, staircase shaft

@15% of built up area

11937.11 Sqm

Basement 18301.00 Sqm

Total Build-up Area (propose) 25274.28 Sqm

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 4

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

Total Constructed Area NIL

Club Area NIL

Basement NIL

Total Sale area 2,71951.25 Sqft

Total construction area in sqft 2,71951.25 Sqft

1.6 Demolition works? No No demolition work is envisaged

1.7 Temporary sites used

for construction works

or housing of

construction workers?

No The site has temporary store rooms for construction materials

during construction phase, which will be later demolished. The

demolition waste will be used within the site itself.

There will be no temporary housing facilities as the local labors

(200 nos. - peak) will be employed.

1.8 Above ground

buildings, structures or

earthworks including

linear structures, cut

and fill or

excavations?

Yes Construction of buildings will involve construction of 528

residential apartments, commercial shops and a school.

1.9 Underground

tunneling or works

including mining?

No No underground works are required.

1.10 Reclamation works? No No reclamation work required.

1.11 Dredging? No No dredging required.

1.12 Offshore structures? No No off shore structures required.

1.13 Production and

manufacturing

processes?

No No production / manufacturing process is involved.

1.14 Facilities for storage

of goods or materials?

No The site has minimal temporary store rooms for the storage of

construction materials, which will be later demolished.

During the operational phase, there will be well designated

confined storage areas within the building, which will not have

impact on the physical environment.

1.15 Facilities for treatment

of disposal of solid

waste or liquid

effluents?

Quantity of Solid Wastes:

Total Solid waste –2 TPD

STP Sludge – 39 Kg/day

Solid wastes likely to be generated in project are of domestic

nature. They will be collected from door to door and segregated

into inorganic and organic wastes.

For handling solid waste generated by the housing and other

areas, different colour coded bins will be provided.

Green bins will be provided for organic waste and blue bins will

be provided for inorganic waste. The organic waste will be

converted into manure by vermin-composting unit. The manure

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 5

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

produced will be used for green belt. The inorganic waste

generated will be segregated and will be sold to authorized

recycler. The inert waste will be transported to the waste disposal

site. Solid waste management as per MSW (Management &

Handling) Rules, 2000.

Liquid Effluent:

During construction, the amount of sewage will be generated

which shall be treated into mobile STP/septic tank and soak pits.

Waste water generated is 197 KLD, which will be treated into

STP (240 KLD) at site and recycled within campus for flushing,

horticulture, cooling towers and Diesel generator cooling. The

surplus quantity will be utilized for irrigation by the nearby

agricultural fields.

1.16 Facilities for long term

housing of operational

Workers?

No Apart from residents, there will be maintenance team along with

security. The impacts due to this will be negligible.

1.17 New road, rail or sea

traffic during

construction or

operation?

No No new road and rail route is envisaged in the proposed project.

Only internal road will be laid. During construction phase, traffic

will be increased due to inward and outward movement of

vehicles carrying construction material.

In the post construction phase, there will be increase in the traffic

levels due to proposed project.

1.18 New road, rail, air

waterborne or other

transport infrastructure

including new or

altered routes and

stations, ports, airports

etc?

Yes Well lit wide metalled roads ranging from 9 to 12 meters width

will be built along with improved microclimate brought about by

plantation of large canopy trees along roads and footpaths.

1.19 Closure or diversion

of existing transport

routes or infrastructure

leading to changes in

traffic movements?

No There will be no diversion of transmission and pipelines, though

the project involves construction of new internal pipelines for

fresh water, recycled water, rain water harvesting, sewer lines

and internal power distribution lines.

1.20 New or diverted

transmission lines or

pipelines?

No There will be no shifting of transmission lines.

1.21 Impoundment,

damming, culverting,

realignment or other

changes to the

hydrology of

watercourses or

aquifers?

No No impounding, damming, culverting, realignment or other

changes to the hydrology of surface watercourses is proposed.

1.22 Stream crossings? No There is no stream existing.

1.23 Abstraction or

transfers of water from

ground or surface

waters?

Yes The daily fresh water demand will be met through ground water

supply. 14 numbers of rain water recharge structures will be

provided during operational phase.

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 6

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

1.24 Changes in water

bodies or the land

surface affecting

drainage or run-off?

Yes Yes, since this is building construction project, the land surface

will be changed to paved area thereby increasing the runoff

during rains.

06 numbers of rain water harvesting pits will be provided.

1.25 Transport of personnel

or materials for

construction, operation

or decommissioning?

Yes Construction:

There will be movement of personnel’s, materials and

construction machineries. The impact due to the same will be

negligible as local people will be deployed and the construction

material and machineries required will be mobilized from the

local area. Thus, there will be contribution of marginal noise &

vehicular emissions.

Post Construction:

During post construction phase, there will be transportation of

personnel’s and materials in and out of the project regularly.

There will be 674 ECU of equivalent cars on road due to the

project on completion of project with 100% occupancy.

1.26 Long-term

dismantling or

decommissioning or

restoration works?

No Not applicable

1.27 Ongoing activity

during

decommissioning

which could have an

impact on the

environment?

No Not applicable

1.28 Influx of people to an

area in either

temporarily or

permanently?

Yes During the construction phase, majority of labourers will be

locally and temporarily hired, hence there will not be major

influx of people anticipated during construction phase of project.

However, during the operation phase, there will be regular

movement of residents, visitors and related personnel’s.

1.29 Introduction of alien

species?

No All plantations will be of indigenous species.

1.30 Loss of native species

or genetic diversity?

No No loss of native species or genetic diversity is envisaged.

1.31 Any other actions? No No

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or

energy, especially any resources which are non-renewable or in short supply):

S. No. Information/checklist

confirmation

Yes/No Details thereof (with approximate quantities

/rates, wherever possible) with source of

information data

2.1 Land especially undeveloped or

agricultural land (ha)

The site has been earmarked as Residential land as

per Master Plan 2021 of Hapur Pilkhuwa

Development Authority (HPDA).

2.2 Water (expected source &

competing users) unit:

Water Source: Ground water supply

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 7

2.3 Minerals (MT) No Not required.

2.4 Construction material – stone

aggregates,, and / soil

(expected source – MT)

Yes Construction materials such as stone, cement, sand,

bricks, marble, paints, tiles, electric ware, sanitary

ware, glass will be used.

All the above materials will be purchased from the

local market and from nearest approved quarries, as

and when required. It will be stored temporarily at

the site.

2.5 Forests and timber (source MT) No Not required.

2.6 Energy including electricity

and fuels (source, competing

users) Unit: fuel (MT), energy

(MW)

Power requirement: 1200 KW

Source of Power: U.P. Power Corp Ltd.

Backup Diesel generator sets (: (1*625KW)

2.7 Any other natural resources

(use appropriate standard units)

No Not required.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful

to human health or the environment or raise concerns about actual or perceived risks to human

health.

S.No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source of

information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health

or the environment (flora, fauna,

and water supplies)

No There will be storage of HSD in the project, which

will be stored in the inbuilt storage tanks of power

generator sets. This will not call for approval from

Oil Industry Safety Directorate as it would be less

than 50 KL.

The significant hazard due to the same will be

negligible as the exposure level will be confined

within a small area in the consequence of unforeseen

hazard.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g.

insect or water borne diseases)

No Site is fairly plain and no water body is present at

site. Suitable drainage and waste management

measures will be adopted in both construction and

operational phase, which will restrict stagnation of

water or accumulation of waste. This will effectively

restrict the reproduction and growth of disease

vectors.

3.3 Affect the welfare of people e.g.

by changing living conditions?

Yes The project will have a positive impact. Facilities

such as security system & garbage unit with

collection will be provided for the everyday demands

of the residents.

Project will provide world class infrastructure

facilities and services which will set standards for

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 8

future development. It will also lead to employment

of local people therefore affecting living conditions

of the locals.

3.4 Vulnerable groups of people who

could be affected by the project

e.g. hospital patients, children,

the elderly etc.,

No The project includes the construction of 528

residential apartments, commercial shops and a

school,so no adverse impact has been anticipated by

this project.

3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

4.1 Spoil, overburden or mine

wastes

No Not required

4.2 Municipal Waste (domestic and

or residential wastes)

Yes These solid wastes will be segregated into

biodegradable and non-biodegradable wastes and

collected in separate bins.

Biodegradable segregated waste (organic waste such

as waste vegetables, foods etc) and garden litter will

be transported to the compost site for bio-

composting.

Recyclable wastes will be sold to authorized

recyclers/kabariwala and inert waste will be used for

construction of road & pavement and other uses on

site.

4.3 Hazardous wastes (as per

Hazardous Waste Management

Rules)

Yes The hazardous wastes in the project will be filter

from standby Diesel Generator sets, which is

classified as hazardous waste category 5.1 as per

Hazardous Wastes (Management & Handling)

Amendments Rules, 2003. They will be carefully

stored in under isolated storages, and periodically

sold to authorized recyclers. All precautions will be

taken during its storage.

4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge

from effluent treatment

Yes Will be used as manure for horticulture.

4.7 Construction or demolition

wastes

Yes The construction waste consists of construction

debris along with cement bags, steel in bits and

pieces, insulating and packaging materials etc.

Cement bags, waste paper and cardboard packing

material would be sold off to recyclers. Unusable

steel scrap will be also collected at site and sold to

recyclers.

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 9

S.No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

4.8 Redundant machinery or

equipment

No There will be no generation of redundant machinery

or equipment for disposal.

4.9 Contaminated soils or other

materials

No Not applicable

4.10 Agricultural wastes Yes Horticulture waste will be generated, which includes

cutting, trimmings, dry leaves & grasses etc. Garden

waste including biodegradable waste will be

transported to the compost site for bio-composting.

4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes The operation of proposed project will not envisage

any major air pollutant generation due to

combustion of fossil fuels, except vehicular

movement (mobile source) and operation of Diesel

generator sets (stationary source) in case of power

backup during power failure.

5.2 Emissions from production

processes

No Not Applicable

5.3 Emissions from materials

handling including storage or

transport

Yes The only source of pollution from material handling

including storage and transport is dust emission due

to vehicles movement. Water sprinkling will be done

during construction phase at regular intervals to

settle dust.

5.4 Emissions from construction

activities including plant and

equipment

Yes No major emission from construction activity will

take place. The only source of pollution will be from

running of mixer and grinder. This will operate for

short duration as and when required.

5.5 Dust or odors from handling of

materials, including construction

materials sewage and waste.

Yes Construction Phase:

Dust will be generated during construction

activity. Water sprinkling will be carried out to

minimize dust suppression.

On site sanitary facilities (septic tank and soak

pit) will be provided during the construction

phase.

Temporary solid waste storage will be provided

at site and recyclable material would be sold off

to recyclers.

Operation Phase:

The sewage generated during operation phase will

be treated in STP and the sludge generated will be

used in greenbelt. Therefore no odour will be

expected from the proposed project.

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 10

S.No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

5.6 Emissions from incineration of

waste

No NA

5.7 Emissions from burning of waste

in open air (e.g. slash materials,

construction debris)

No NA

5.8 Emissions from any other

sources

No NA

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data with source of information

data

6.1 From operation of equipment

ventilation plant, crushers e.g.

engines,

Yes The noise levels (dB) generated from construction

equipment at a distance of 50 ft. from the source are

given below:

Concrete Mixer Truck - 85 dB

Mobile cranes - 81 dB

Hammering - 86 dB

Loader - 81 dB

However, all the equipments will be kept in

temporary acoustic enclosures and hence the noise

levels will be well within permissible standards.

6.2 From industrial or similar

processes

No

6.3 From construction or demolition Yes During construction work, noise will be generated

from construction machinery; however, adequate

precautions shall be taken to reduce noise

generation.

6.4 From blasting or piling No No blasting or piling will be done.

6.5 From construction or operational

traffic

Yes It shall be restricted within a limited area. Some

amount of noise will be generated in the

construction and operational phase, however,

adequate precautions will be taken to reduce noise

generation i.e. development of green area which will

act as barrier to control noise/air pollution.

6.6 From lighting or cooling systems No During power failure, operation of Diesel Generator

sets will generate noise. However, these shall be

housed in acoustically enclosed chambers.

6.7 From any other sources No

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,

surface waters, groundwater, coastal waters or the sea:

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 11

S.No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

7.1 From handling, storage,

hazardous materials use or

spillage of hazardous materials

Yes The only hazardous waste is filters from Diesel

generator sets. They will be carefully stored in under

isolated storage and periodically sold to authorize

recyclers. All precautions will be taken during the

storage.

7.2 From discharge of sewage or

other effluents water or the land

(expected mode and place of

discharge) to

No Not Applicable

7.3 By deposition of pollutants

emitted to air into the land or

into water

No Deposition of dust on land & plants from air due to

transportation will be there, both during operational &

construction phase but will be minimal. Water

sprinkling and good housekeeping shall be regularly

carried out

7.4 From any other sources No

7.5 Is there a risk of long term build

up of pollutants in the

environment from these

sources?

No There is no risk of long term build up of pollutants in

the environment from handling, storage, use or

spillage of hazardous materials, discharge of sewage

or other effluents to water or the land and by

deposition of pollutants emitted to air into the land or

into water sources.

8. Risk of accidents during construction or operation of the Project, which could affect human health

or the environment

S.No. Information/Checklist

confirmation Yes/No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

8.1 From explosions, spillages,

fires etc from storage,

handling, use or production of

hazardous substances

Yes This is basically a construction project and does not

involve major hazardous construction activity. Hence,

chances of explosions, spillages, fires are minimal.

All construction workers will be provided with

suitable personal protective equipment (PPE) as per

the health & safety norms. Training and awareness

about the safety norms will be provided to all

supervisors and workers involved in construction

activities. An agreement will be signed with the

contractor, which will clearly deal safety aspects

during construction. No major hazardous waste is

being stored within the project site. No industrial or

process activity is involved in this project hence

chances of chemical hazards and accidents are

minimal. However, suitable fire-fighting measures

will be provided.

8.2 From any other causes No For accidental fires, fire fighting pumps are to be

installed.

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 12

8.3 Could the project be affected

by natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

No The project falls under Seismic Zone III. Design and

architecture of building will be earthquake resistant

and will comply with the required IS Specifications.

Proper measures shall be taken in detailed design to

minimize the impact of any disaster. Area is not flood

prone. Building to be designed as per seismic zone

requirements.

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with source

of information data

9.1 Lead to development of

supporting facilities, ancillary

development or development

stimulated by the project which

could have impact on the

environment e.g.:

This is a development of Residential project. The

existing infrastructure is adequate to meet the

requirement of proposed project.

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

Yes In order to support, power lines will be drawn, roads

will be constructed within the proposed project as

well as for access. Water supply and sewage

systems will be laid down extensively.

• housing development No It’s a Residential Project.

• extractive industries No

• supply industries

Yes

• other No

9.2

Lead to after-use of the site,

which could have an impact on

the environment?

No NA

9.3 Set a precedent for later

developments?

No No illegal activity is predicted and development of

the entire region is anticipated as per local bye laws.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

It will improve the environment by creating a more

attractive and inter active environment for living,

leisure & recreation, create an urban landmark.

iii. Environmental Sensitivity

S.No. Areas Name/

Identity

Aerial distance (within 15 km.)

Proposed project location boundary

1.

Areas protected under international

conventions, national or local legislation

for their ecological, landscape, cultural or

other related value

No None in 10 km radius

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 13

S.No. Areas Name/

Identity

Aerial distance (within 15 km.)

Proposed project location boundary

2.

Areas which are important or sensitive for

ecological reasons - Wetlands,

watercourses or other water bodies,

coastal zone, biospheres, mountains,

forests

Yes

Partapur Chungi Lake – 1.8Km

SW)

Galand Pond – 8.4 Km (SW)

Upper Ganga Canal Rd – 10.8(S)

3.

Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

No None in 10 km radius

4. Inland, coastal, marine or underground

waters Yes

Partapur Chungi Lake – 1.8 Km

SW)

Galand Pond – 8.4 Km (SW)

Upper Ganga Canal Rd – 10.8Km

(S)

5. State, National boundaries No Project lies within U.P. State.

Ghaziabad is 22.8 km from site.

6.

Routes or facilities used by the public for

access to recreation or other tourist,

pilgrim areas

No

7. Defense installations No None in 10 km radius.

8. Densely populated or built-up area

(aerial distances)

Ghaziabad- 22.8 Km (SW)

Hapur – 10.1 Km (E)

9.

Areas occupied by sensitive man-made

land uses (hospitals, schools, places of

worship, community facilities)

Yes

There are several hospitals, schools,

places of worship, and community

facilities within 15 km radius of the

project site.

10.

Areas containing important, high quality

or scarce resources (ground water

resources, surface resources, forestry,

agriculture, fisheries, tourism, minerals)

No

11.

Areas already subjected to pollution or

environmental damage.

(Those where existing legal environmental

standards are exceeded).

Nil

12. Areas susceptible to natural hazard which

could cause the project to present

environmental problems (earthquakes,

subsidence, landslides, erosion, flooding

or extreme or adverse climatic conditions)

No

According to the Indian Standard

Seismic Zoning Map, the area under

study falls in Zone-III. Suitable

seismic coefficients in horizontal and

vertical directions will be adopted

while designing the structures.

Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.

By M/s. Luxmi Infrahome Pvt. Ltd.

FORM - 1 Page 14

“I hereby given undertaking that the data and information given in the application and enclosures are true to

the best of my knowledge and belief and I am aware that if any part of the data and information submitted is

found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the

project will be revoked at our risk and cost.

Date: 22.08.2014

Place: Ghaziabad, UP

Signature of the applicant

Address:

NOTE:

1. The Projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with

the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project

activities, w.r.t. C.R.Z. and the recommendations of the state Coastal Zone management Authority.

Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the

C.R.Z. Notification, 1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves,

Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated

by Chief Wildlife Warden showing these features vis-à-vis the project location and the

recommendations or comments of the Chief Wildlife Warden thereon.”

3. All correspondence with the Ministry of Environment & Forests including submission of application

for TOR/ Environmental Clearance, subsequent clarifications, as may be required from time to time,

participation in the SEAC Meeting on behalf of the project proponent shall be made by the authorized

signatory only. The authorized signatory should also submit a document in support of his claim of

being an authorized signatory for the specific project”