Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 1
FORM - 1
i. Basic Information
Sl. Item
Details
1 Name of the project/s An Affordable Group Housing Project “Chandra Kanta
Residencey” by M/s LUXMI INFRA HOMES PVT. LTD. at
Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur,
Pilakhuwa.Distt. Hapur ,Ghaziabad , Uttar Pradesh.
2 S.No. In the schedule The project is categorized as B & item 8 (a) of Schedule -
Gazette Notification dated Sep 14, 2006 and subsequent
amendments issued by MoEF, New Delhi.
3
Proposed capacity/area/length/tonnage
to be handled/command area/lease
area/number of wells to be drilled
Total Plot area – 21509.80 sqm
Net Plot Area- 19830.62 sqm
Total Green Belt Area- 2975.00 sqm (15% of Net Plot Area)
Built-up Area- 25274.28 sqm
Ground Floor Covered Area- 6292.32 sqm
Total Commercial Area-105.0 sqm
Road/Open Area- 13433.3 sqm
4 New/Expansion/Modernization New Project Affordable group housing
5 Existing Capacity/Area etc. NA
6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), Category B
(Building and Construction Project)
7 Does it attract the general condition?
If yes, please specify.
No
8 Does it attract the specific condition?
If yes, please specify. No
9
Location Pilkhuwa
Plot/Survey/Khasra No. Khasra No; 528, Village Mirapur Pilkhuwa
Khasra map – Annexure-1
Village Mirapur
Tehsil Dhaulana
District Hapur
State Uttar Pradesh
10 Nearest railway station/airport along
with distance in kms. Ghaziabad Railway Station –4KM (S)
11
Nearest town, city, district
headquarters along with distance in
kms.
12
Village Panchayats, Zilla Parishad,
Muncipal corporation, Local body
(complete postal addresses with
telephone nos. to be given)
Ghaziabad Development Authority (GDA).
13 Name of the applicant Mr.Manoj Kumar Goel
14 Registered address C5/10 Krisna nagar Delhi east Delhi 110051
15 Address for correspondence C5/10 Krisna nagar Delhi east Delhi 110051
Name Mr.Manoj Kumar Goel
Designation (Owner/Partner/CEO) Owner
Address C5/10 Krisna nagar Delhi east Delhi 110051
Pin Code 245304
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 2
Sl. Item
Details
E-mail [email protected]
Telephone No. 91-9810121398
Fax no. -
16
Details of Alternative sites examined,
if any. Location of these sites should
be shown on a toposheet.
No site alternatives are under consideration.
17 Interlinked projects Nil
18
Whether separate application of
interlinked project has been
submitted?
N.A.
19 If yes, date of submission N.A.
20 If no, reason N.A.
21
Whether the proposal involves
approval/clearance under: If yes,
details of the same and their status to
be given.
(a) The forest (conservation) Act,
1980?
(b) The wildlife (protection) Act,
1972?
(c) The C.R.Z. Notification, 1991?
No
No
No
22
Whether there is any Government
order/Policy relevant/relating to the
site?
The site has been earmarked for Residential purposes as per
Master Plan 2021 of Hapur Pilkhuwa Development Authority
(HPDA).
23 Forest land involved (hectares) No
24
Whether there is any litigation
pending against the project and/or
land in which the project is propose to
be set up?
(a) Name of the court
(b) Case No.
(c) Orders/directions of the court, if
any and its relevance with the
proposed project.
No litigation is pending against the project or the project land
in any court of law to the best of knowledge.
ii. Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 3
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
1.1 Permanent or
temporary change in
land use, land cover or
topography including
increase in intensity of
land use (with respect
to local land use plan)
No The proposed project envisages no change in land use as the area
has been earmarked for residential purposes as per the master
plan 2021 of Hapur Pilkhuwa Development Authority (HPDA).
Hence proposed project do not anticipate any further permanent
or temporary change in land use of the area.
1.2 Clearance of existing
land, vegetation and
buildings.
Yes Very small vegetation like Parthenium and Doob grass.
1.3 Creation of new land
uses?
No The site has been earmarked for Residential purpose as per
Master Plan 2021 of Hapur Pilkhuwa Development Authority
(HPDA).
1.4 Pre-construction
investigations e.g.
bore holes, soil
testing?
No There will be no physical impact on the locality due to the soil
testing or other pre-investigations.
1.5 Construction works? Yes The project includes the construction of 528 residential
apartments, commercial shops and a school, Project brief is
as follows:
Area under construction site :
S. No. Items Details
(sq m)
A Plot Area 19830.62sqm B Residential Built-up area 25169.28sqm C Basement Built-up area 00.00 sqm D Commercial Built-up area 105.00 sqm E School Built-up area 500.00 sqm
Area under Build up:
Description Area
Plot area 21509.80 Sqm
Area under Master Plan Road 1679.18 Sqm
Area Under chak Road 00.00 Sqm
Net Plot Area 19830.62 Sqm
Less 15% green Area 2975.00 Sqm
Net Plot Area 16855.62 Sqm
Permissible Area 2.50 Sqm
Available Area 79580.76 Sqm
Build-up Area 79580.76 Sqm
Balconies, staircase shaft
@15% of built up area
11937.11 Sqm
Basement 18301.00 Sqm
Total Build-up Area (propose) 25274.28 Sqm
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 4
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
Total Constructed Area NIL
Club Area NIL
Basement NIL
Total Sale area 2,71951.25 Sqft
Total construction area in sqft 2,71951.25 Sqft
1.6 Demolition works? No No demolition work is envisaged
1.7 Temporary sites used
for construction works
or housing of
construction workers?
No The site has temporary store rooms for construction materials
during construction phase, which will be later demolished. The
demolition waste will be used within the site itself.
There will be no temporary housing facilities as the local labors
(200 nos. - peak) will be employed.
1.8 Above ground
buildings, structures or
earthworks including
linear structures, cut
and fill or
excavations?
Yes Construction of buildings will involve construction of 528
residential apartments, commercial shops and a school.
1.9 Underground
tunneling or works
including mining?
No No underground works are required.
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No off shore structures required.
1.13 Production and
manufacturing
processes?
No No production / manufacturing process is involved.
1.14 Facilities for storage
of goods or materials?
No The site has minimal temporary store rooms for the storage of
construction materials, which will be later demolished.
During the operational phase, there will be well designated
confined storage areas within the building, which will not have
impact on the physical environment.
1.15 Facilities for treatment
of disposal of solid
waste or liquid
effluents?
Quantity of Solid Wastes:
Total Solid waste –2 TPD
STP Sludge – 39 Kg/day
Solid wastes likely to be generated in project are of domestic
nature. They will be collected from door to door and segregated
into inorganic and organic wastes.
For handling solid waste generated by the housing and other
areas, different colour coded bins will be provided.
Green bins will be provided for organic waste and blue bins will
be provided for inorganic waste. The organic waste will be
converted into manure by vermin-composting unit. The manure
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 5
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
produced will be used for green belt. The inorganic waste
generated will be segregated and will be sold to authorized
recycler. The inert waste will be transported to the waste disposal
site. Solid waste management as per MSW (Management &
Handling) Rules, 2000.
Liquid Effluent:
During construction, the amount of sewage will be generated
which shall be treated into mobile STP/septic tank and soak pits.
Waste water generated is 197 KLD, which will be treated into
STP (240 KLD) at site and recycled within campus for flushing,
horticulture, cooling towers and Diesel generator cooling. The
surplus quantity will be utilized for irrigation by the nearby
agricultural fields.
1.16 Facilities for long term
housing of operational
Workers?
No Apart from residents, there will be maintenance team along with
security. The impacts due to this will be negligible.
1.17 New road, rail or sea
traffic during
construction or
operation?
No No new road and rail route is envisaged in the proposed project.
Only internal road will be laid. During construction phase, traffic
will be increased due to inward and outward movement of
vehicles carrying construction material.
In the post construction phase, there will be increase in the traffic
levels due to proposed project.
1.18 New road, rail, air
waterborne or other
transport infrastructure
including new or
altered routes and
stations, ports, airports
etc?
Yes Well lit wide metalled roads ranging from 9 to 12 meters width
will be built along with improved microclimate brought about by
plantation of large canopy trees along roads and footpaths.
1.19 Closure or diversion
of existing transport
routes or infrastructure
leading to changes in
traffic movements?
No There will be no diversion of transmission and pipelines, though
the project involves construction of new internal pipelines for
fresh water, recycled water, rain water harvesting, sewer lines
and internal power distribution lines.
1.20 New or diverted
transmission lines or
pipelines?
No There will be no shifting of transmission lines.
1.21 Impoundment,
damming, culverting,
realignment or other
changes to the
hydrology of
watercourses or
aquifers?
No No impounding, damming, culverting, realignment or other
changes to the hydrology of surface watercourses is proposed.
1.22 Stream crossings? No There is no stream existing.
1.23 Abstraction or
transfers of water from
ground or surface
waters?
Yes The daily fresh water demand will be met through ground water
supply. 14 numbers of rain water recharge structures will be
provided during operational phase.
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 6
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
1.24 Changes in water
bodies or the land
surface affecting
drainage or run-off?
Yes Yes, since this is building construction project, the land surface
will be changed to paved area thereby increasing the runoff
during rains.
06 numbers of rain water harvesting pits will be provided.
1.25 Transport of personnel
or materials for
construction, operation
or decommissioning?
Yes Construction:
There will be movement of personnel’s, materials and
construction machineries. The impact due to the same will be
negligible as local people will be deployed and the construction
material and machineries required will be mobilized from the
local area. Thus, there will be contribution of marginal noise &
vehicular emissions.
Post Construction:
During post construction phase, there will be transportation of
personnel’s and materials in and out of the project regularly.
There will be 674 ECU of equivalent cars on road due to the
project on completion of project with 100% occupancy.
1.26 Long-term
dismantling or
decommissioning or
restoration works?
No Not applicable
1.27 Ongoing activity
during
decommissioning
which could have an
impact on the
environment?
No Not applicable
1.28 Influx of people to an
area in either
temporarily or
permanently?
Yes During the construction phase, majority of labourers will be
locally and temporarily hired, hence there will not be major
influx of people anticipated during construction phase of project.
However, during the operation phase, there will be regular
movement of residents, visitors and related personnel’s.
1.29 Introduction of alien
species?
No All plantations will be of indigenous species.
1.30 Loss of native species
or genetic diversity?
No No loss of native species or genetic diversity is envisaged.
1.31 Any other actions? No No
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or
energy, especially any resources which are non-renewable or in short supply):
S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or
agricultural land (ha)
The site has been earmarked as Residential land as
per Master Plan 2021 of Hapur Pilkhuwa
Development Authority (HPDA).
2.2 Water (expected source &
competing users) unit:
Water Source: Ground water supply
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 7
2.3 Minerals (MT) No Not required.
2.4 Construction material – stone
aggregates,, and / soil
(expected source – MT)
Yes Construction materials such as stone, cement, sand,
bricks, marble, paints, tiles, electric ware, sanitary
ware, glass will be used.
All the above materials will be purchased from the
local market and from nearest approved quarries, as
and when required. It will be stored temporarily at
the site.
2.5 Forests and timber (source MT) No Not required.
2.6 Energy including electricity
and fuels (source, competing
users) Unit: fuel (MT), energy
(MW)
Power requirement: 1200 KW
Source of Power: U.P. Power Corp Ltd.
Backup Diesel generator sets (: (1*625KW)
2.7 Any other natural resources
(use appropriate standard units)
No Not required.
3. Use, storage, transport, handling or production of substances or materials, which could be harmful
to human health or the environment or raise concerns about actual or perceived risks to human
health.
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source of
information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora, fauna,
and water supplies)
No There will be storage of HSD in the project, which
will be stored in the inbuilt storage tanks of power
generator sets. This will not call for approval from
Oil Industry Safety Directorate as it would be less
than 50 KL.
The significant hazard due to the same will be
negligible as the exposure level will be confined
within a small area in the consequence of unforeseen
hazard.
3.2 Changes in occurrence of disease
or affect disease vectors (e.g.
insect or water borne diseases)
No Site is fairly plain and no water body is present at
site. Suitable drainage and waste management
measures will be adopted in both construction and
operational phase, which will restrict stagnation of
water or accumulation of waste. This will effectively
restrict the reproduction and growth of disease
vectors.
3.3 Affect the welfare of people e.g.
by changing living conditions?
Yes The project will have a positive impact. Facilities
such as security system & garbage unit with
collection will be provided for the everyday demands
of the residents.
Project will provide world class infrastructure
facilities and services which will set standards for
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 8
future development. It will also lead to employment
of local people therefore affecting living conditions
of the locals.
3.4 Vulnerable groups of people who
could be affected by the project
e.g. hospital patients, children,
the elderly etc.,
No The project includes the construction of 528
residential apartments, commercial shops and a
school,so no adverse impact has been anticipated by
this project.
3.5 Any other causes No
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
4.1 Spoil, overburden or mine
wastes
No Not required
4.2 Municipal Waste (domestic and
or residential wastes)
Yes These solid wastes will be segregated into
biodegradable and non-biodegradable wastes and
collected in separate bins.
Biodegradable segregated waste (organic waste such
as waste vegetables, foods etc) and garden litter will
be transported to the compost site for bio-
composting.
Recyclable wastes will be sold to authorized
recyclers/kabariwala and inert waste will be used for
construction of road & pavement and other uses on
site.
4.3 Hazardous wastes (as per
Hazardous Waste Management
Rules)
Yes The hazardous wastes in the project will be filter
from standby Diesel Generator sets, which is
classified as hazardous waste category 5.1 as per
Hazardous Wastes (Management & Handling)
Amendments Rules, 2003. They will be carefully
stored in under isolated storages, and periodically
sold to authorized recyclers. All precautions will be
taken during its storage.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge
from effluent treatment
Yes Will be used as manure for horticulture.
4.7 Construction or demolition
wastes
Yes The construction waste consists of construction
debris along with cement bags, steel in bits and
pieces, insulating and packaging materials etc.
Cement bags, waste paper and cardboard packing
material would be sold off to recyclers. Unusable
steel scrap will be also collected at site and sold to
recyclers.
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 9
S.No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
4.8 Redundant machinery or
equipment
No There will be no generation of redundant machinery
or equipment for disposal.
4.9 Contaminated soils or other
materials
No Not applicable
4.10 Agricultural wastes Yes Horticulture waste will be generated, which includes
cutting, trimmings, dry leaves & grasses etc. Garden
waste including biodegradable waste will be
transported to the compost site for bio-composting.
4.11 Other solid wastes No Not applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes The operation of proposed project will not envisage
any major air pollutant generation due to
combustion of fossil fuels, except vehicular
movement (mobile source) and operation of Diesel
generator sets (stationary source) in case of power
backup during power failure.
5.2 Emissions from production
processes
No Not Applicable
5.3 Emissions from materials
handling including storage or
transport
Yes The only source of pollution from material handling
including storage and transport is dust emission due
to vehicles movement. Water sprinkling will be done
during construction phase at regular intervals to
settle dust.
5.4 Emissions from construction
activities including plant and
equipment
Yes No major emission from construction activity will
take place. The only source of pollution will be from
running of mixer and grinder. This will operate for
short duration as and when required.
5.5 Dust or odors from handling of
materials, including construction
materials sewage and waste.
Yes Construction Phase:
Dust will be generated during construction
activity. Water sprinkling will be carried out to
minimize dust suppression.
On site sanitary facilities (septic tank and soak
pit) will be provided during the construction
phase.
Temporary solid waste storage will be provided
at site and recyclable material would be sold off
to recyclers.
Operation Phase:
The sewage generated during operation phase will
be treated in STP and the sludge generated will be
used in greenbelt. Therefore no odour will be
expected from the proposed project.
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 10
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
5.6 Emissions from incineration of
waste
No NA
5.7 Emissions from burning of waste
in open air (e.g. slash materials,
construction debris)
No NA
5.8 Emissions from any other
sources
No NA
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data with source of information
data
6.1 From operation of equipment
ventilation plant, crushers e.g.
engines,
Yes The noise levels (dB) generated from construction
equipment at a distance of 50 ft. from the source are
given below:
Concrete Mixer Truck - 85 dB
Mobile cranes - 81 dB
Hammering - 86 dB
Loader - 81 dB
However, all the equipments will be kept in
temporary acoustic enclosures and hence the noise
levels will be well within permissible standards.
6.2 From industrial or similar
processes
No
6.3 From construction or demolition Yes During construction work, noise will be generated
from construction machinery; however, adequate
precautions shall be taken to reduce noise
generation.
6.4 From blasting or piling No No blasting or piling will be done.
6.5 From construction or operational
traffic
Yes It shall be restricted within a limited area. Some
amount of noise will be generated in the
construction and operational phase, however,
adequate precautions will be taken to reduce noise
generation i.e. development of green area which will
act as barrier to control noise/air pollution.
6.6 From lighting or cooling systems No During power failure, operation of Diesel Generator
sets will generate noise. However, these shall be
housed in acoustically enclosed chambers.
6.7 From any other sources No
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal waters or the sea:
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 11
S.No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
7.1 From handling, storage,
hazardous materials use or
spillage of hazardous materials
Yes The only hazardous waste is filters from Diesel
generator sets. They will be carefully stored in under
isolated storage and periodically sold to authorize
recyclers. All precautions will be taken during the
storage.
7.2 From discharge of sewage or
other effluents water or the land
(expected mode and place of
discharge) to
No Not Applicable
7.3 By deposition of pollutants
emitted to air into the land or
into water
No Deposition of dust on land & plants from air due to
transportation will be there, both during operational &
construction phase but will be minimal. Water
sprinkling and good housekeeping shall be regularly
carried out
7.4 From any other sources No
7.5 Is there a risk of long term build
up of pollutants in the
environment from these
sources?
No There is no risk of long term build up of pollutants in
the environment from handling, storage, use or
spillage of hazardous materials, discharge of sewage
or other effluents to water or the land and by
deposition of pollutants emitted to air into the land or
into water sources.
8. Risk of accidents during construction or operation of the Project, which could affect human health
or the environment
S.No. Information/Checklist
confirmation Yes/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
8.1 From explosions, spillages,
fires etc from storage,
handling, use or production of
hazardous substances
Yes This is basically a construction project and does not
involve major hazardous construction activity. Hence,
chances of explosions, spillages, fires are minimal.
All construction workers will be provided with
suitable personal protective equipment (PPE) as per
the health & safety norms. Training and awareness
about the safety norms will be provided to all
supervisors and workers involved in construction
activities. An agreement will be signed with the
contractor, which will clearly deal safety aspects
during construction. No major hazardous waste is
being stored within the project site. No industrial or
process activity is involved in this project hence
chances of chemical hazards and accidents are
minimal. However, suitable fire-fighting measures
will be provided.
8.2 From any other causes No For accidental fires, fire fighting pumps are to be
installed.
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 12
8.3 Could the project be affected
by natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc)?
No The project falls under Seismic Zone III. Design and
architecture of building will be earthquake resistant
and will comply with the required IS Specifications.
Proper measures shall be taken in detailed design to
minimize the impact of any disaster. Area is not flood
prone. Building to be designed as per seismic zone
requirements.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
9.1 Lead to development of
supporting facilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
This is a development of Residential project. The
existing infrastructure is adequate to meet the
requirement of proposed project.
• Supporting infrastructure
(roads, power supply, waste or
waste water treatment, etc.)
Yes In order to support, power lines will be drawn, roads
will be constructed within the proposed project as
well as for access. Water supply and sewage
systems will be laid down extensively.
• housing development No It’s a Residential Project.
• extractive industries No
• supply industries
Yes
• other No
9.2
Lead to after-use of the site,
which could have an impact on
the environment?
No NA
9.3 Set a precedent for later
developments?
No No illegal activity is predicted and development of
the entire region is anticipated as per local bye laws.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
It will improve the environment by creating a more
attractive and inter active environment for living,
leisure & recreation, create an urban landmark.
iii. Environmental Sensitivity
S.No. Areas Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
1.
Areas protected under international
conventions, national or local legislation
for their ecological, landscape, cultural or
other related value
No None in 10 km radius
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 13
S.No. Areas Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
2.
Areas which are important or sensitive for
ecological reasons - Wetlands,
watercourses or other water bodies,
coastal zone, biospheres, mountains,
forests
Yes
Partapur Chungi Lake – 1.8Km
SW)
Galand Pond – 8.4 Km (SW)
Upper Ganga Canal Rd – 10.8(S)
3.
Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting, over
wintering, migration
No None in 10 km radius
4. Inland, coastal, marine or underground
waters Yes
Partapur Chungi Lake – 1.8 Km
SW)
Galand Pond – 8.4 Km (SW)
Upper Ganga Canal Rd – 10.8Km
(S)
5. State, National boundaries No Project lies within U.P. State.
Ghaziabad is 22.8 km from site.
6.
Routes or facilities used by the public for
access to recreation or other tourist,
pilgrim areas
No
7. Defense installations No None in 10 km radius.
8. Densely populated or built-up area
(aerial distances)
Ghaziabad- 22.8 Km (SW)
Hapur – 10.1 Km (E)
9.
Areas occupied by sensitive man-made
land uses (hospitals, schools, places of
worship, community facilities)
Yes
There are several hospitals, schools,
places of worship, and community
facilities within 15 km radius of the
project site.
10.
Areas containing important, high quality
or scarce resources (ground water
resources, surface resources, forestry,
agriculture, fisheries, tourism, minerals)
No
11.
Areas already subjected to pollution or
environmental damage.
(Those where existing legal environmental
standards are exceeded).
Nil
12. Areas susceptible to natural hazard which
could cause the project to present
environmental problems (earthquakes,
subsidence, landslides, erosion, flooding
or extreme or adverse climatic conditions)
No
According to the Indian Standard
Seismic Zoning Map, the area under
study falls in Zone-III. Suitable
seismic coefficients in horizontal and
vertical directions will be adopted
while designing the structures.
Proposed Affordable Group Housing Project“Chandra Kanta Residency ” at at Kharsa no. 528 Partapur Road Near RKGEC Vill. Mirapur, Pilakhuwa. Distt. Hapur ,Ghaziabad , Uttar Pradesh.
By M/s. Luxmi Infrahome Pvt. Ltd.
FORM - 1 Page 14
“I hereby given undertaking that the data and information given in the application and enclosures are true to
the best of my knowledge and belief and I am aware that if any part of the data and information submitted is
found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the
project will be revoked at our risk and cost.
Date: 22.08.2014
Place: Ghaziabad, UP
Signature of the applicant
Address:
NOTE:
1. The Projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with
the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project
activities, w.r.t. C.R.Z. and the recommendations of the state Coastal Zone management Authority.
Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the
C.R.Z. Notification, 1991 for the activities to be located in the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves,
Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated
by Chief Wildlife Warden showing these features vis-à-vis the project location and the
recommendations or comments of the Chief Wildlife Warden thereon.”
3. All correspondence with the Ministry of Environment & Forests including submission of application
for TOR/ Environmental Clearance, subsequent clarifications, as may be required from time to time,
participation in the SEAC Meeting on behalf of the project proponent shall be made by the authorized
signatory only. The authorized signatory should also submit a document in support of his claim of
being an authorized signatory for the specific project”