PRE FEASIBILITY REPORT RB POLYMERS LTD.

13
PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE PROPOSED EXPANSION OF RESIN MANUFACTURING UNIT RB POLYMERS LTD. Survey No.: 196/1, Plot No.: 103 to 108, Mahalaxmi Industrial Estate, Village: Iyava, Taluka: Sanand, District: Ahmedabad, Gujarat. Contact No.: 9724330497 Email: [email protected] Prepared By: T. R. ASSOCIATES C605/A, Ganesh Meridian, Opp. Kargil Petrol Pump, S. G. Highway, Ahmedabad Contact No.: 9825371099 Email: [email protected] AUGUST 2018

Transcript of PRE FEASIBILITY REPORT RB POLYMERS LTD.

 

PRE FEASIBILITY REPORT 

 

FOR OBTAINING ENVIRONMENTAL CLEARANCE 

PROPOSED EXPANSION OF RESIN MANUFACTURING UNIT 

RB POLYMERS LTD. 

Survey No.: 196/1, Plot No.: 103 to 108,  

Mahalaxmi Industrial Estate,  

Village: Iyava, Taluka: Sanand,  

District: Ahmedabad, Gujarat. 

 Contact No.: 9724330497 

Email: [email protected]  

 

Prepared By: 

T. R. ASSOCIATES 

C‐605/A, Ganesh Meridian, Opp. Kargil Petrol Pump, 

S. G. Highway, Ahmedabad 

Contact No.: 9825371099 

Email: [email protected]  

AUGUST 2018 

 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 1 of 13  

1. Introduction  

RB Polymers Ltd.  is a  limited company Proposed Expansion of Resin Manufacturing unit at Survey No.: 196/1,  Plot  No.:  103  to  108,  Mahalaxmi  Industrial  Estate,  Village:  Iyava,  Taluka:  Sanand,  District: Ahmedabad‐382110, Gujarat. Project Proponent and their back ground.  

 Details of Partner are as given below.   

Sr. No.  Name of Director  Contact No.  Address 

1  Rakesh Roongta  9825037363 903, Pushkar Tower, Nr. Judge Bunglows 

Road, Bodakdev, Ahmedabad 

2  Subhash Roongta  9830096742  P‐42, C.I.T. Road, Csheme‐VIM, Kolkata 

3   Chirag Sheth  9824042030 C‐605, Gurukul Park, Nr. Sterling Hospital, 

Gurukul, Ahmedabad  

 

2. Brief description of nature of the project:  

M/s.  RB  Polymers  Ltd.  is manufacturing  Laminated  sheets  ,  Phenol  Formaldehyde  Resin  and 

Melamine  Formaldehyde Resin  at  Survey No.: 196/1, Plot No.: 103  to 108, Mahalaxmi  Industrial 

Estate,  Village:  Iyava,  Taluka:  Sanand,  District:  Ahmedabad‐382110,  Gujarat.  Now we want  to 

increase  production  capacity  of  Existing  Product  (i.e. MF  Resin  &  PF  Resin)  and  proposed  to 

manufacture a new product  i.e. UF resin  in their existing plant due to higher market demand as 

well as Laminate sheet production.  

M/s. RB  Polymers  Ltd.  is willing  for  expansion  to manufacture Melamine  Formaldehyde Resin, 

Phenol Formaldehyde Resin and proposed to manufacture Urea Formaldehyde Resin at Plot No.: 

103  to  108, Mahalaxmi  Industrial  Estate,  Village:  Iyava,  Taluka:  Sanand,  District:  Ahmedabad, 

Gujarat.  The  existing  products  are  already  used  for  captive  consumption  for  Laminate  sheet 

production, where in the proposed products also shall be used in the Laminate sheet production 

as well as for sale purpose. 

The  stated  products  falls  under  Category  5(f)  as  stated  in  Environment  Impact  Assessment 

Notification  Published  on  14th  September,  2006  and  its  subsequent  amendments.  Further,  the 

location  of  the  proposed  project  is  outside  the  notified  industrial  estate.  Hence,  the  project 

proponent has to obtain the EC from the Ministry of Environment, Forest & Climate Change, New 

Delhi. M/s. T. R. Associates (NABET and NABL Accredited EIA consultants) has been appointed to 

carry out EIA/EMP studies for obtaining Environmental Clearance.  

The total  land area of company  is 10,407.46 m2 out of which 3,453.21 m2  (33.2 % of total  land) 

area will  be  used  for  greenbelt  development.  Total  after  proposed  expansion  project  cost will  be 

approx.  550  lakh  [Existing  project  cost  ‐  515  lakh  +  Proposed  Expansion  project  cost  –  35  lakh].  Total 

budget allocation  towards Environmental Management Facilities will be approx. 40  lakh  [Existing 

project cost ‐ 25 lakh + Proposed Expansion project cost – 15 lakh]. Total 30 persons [Existing persons – 

14  +  Proposed  Expansion  persons  ‐  16]  will  be  employed  including  skilled  persons,  unskilled 

persons & office staff. 

PFR

RB Polymers Ltd.                                                                                                                          Page 2 of 13  

  Local workers  Permanent workers 

Existing workers  5 Nos.  9 Nos. 

After Total Proposed Expansion  12 Nos.  18 Nos.  

Resins are used predominantly  in the wood based product manufacturing  industry as adhesives. 

Growth  of  the  resin market  is  strongly  correlated  to  construction/remodeling  activity  (which 

accounts for over 50% of consumption), and to a lesser degree, to the automotive industry.  

The  stated  products  like  Resins  (Melamine  Formaldehyde,  Urea  Formaldehyde  and  Phenol 

Formaldehyde  Resins) mainly  used  to manufacture  Laminated  Sheets.  These  sheets  have  good 

market demand to develop the home and office for furniture. 

 

3. Project Description 

(i) Type of project including interlinked and interdependent projects:   

RB Polymers Ltd.  is expanding the manufacturing of synthetic organic chemicals which are 

Phenol Formaldehyde Resin, Melamine Formaldehyde Resin and addition of new product i.e. 

Urea Formaldehyde Resin.    

(ii) Location 

Survey No.: 196/1, Plot No.: 103  to 108, Mahalaxmi  Industrial Estate, Village:  Iyava, Taluka: 

Sanand, District: Ahmedabad‐382110, Gujarat.  

Geographic Coordinates 

Latitude: 23° 1'27.03"N     Longitude: 72°18'29.85"E  

Google image showing proposed project site is given below; 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 3 of 13  

Salient features in the surroundings area of the proposed site within 10 km radius are as follows:  

Sr. No.  Important Features Description 

1  Location  Survey No.: 196/1, Plot No.: 103 to 108, Mahalaxmi 

Industrial  Estate,  Village:  Iyava,  Taluka:  Sanand, 

District: Ahmedabad‐382110, Gujarat. 

2  GPS Coordinates  Latitude: 23°1'27.03"N     Longitude: 72°18'29.85"E

3  Temperature Range   11.7 °C – 41.8 °C

4  Mean Sea Level  34 m

5  Annual Rain Fall  630 mm

6  Nearest Railway Station Chharodi  Railway  Station  –  3.70  km  in  WNW 

direction 

7  Nearest Airport  Ahmedabad  Airport –  32.50 km in East direction

8  Nearest Taluka  Sanand – 7.1 km in ESE direction 

9  Nearest Village  Iyava – 1.45 km in East direction 

10  Nearest State Highway  State Highway 17 – 0.24 km in NNE direction 

11  Nearest National Highway National Highway 947 – 0.24 km in NNE direction

12  Nearest River/Water body Khoda pond‐ 1.47 km in West direction 

Chharodi pond – 5.51 km in WSW direction 

Iyava pond‐1.35 km in NE direction 

13  Nearest  National  Parks  / 

Sanctuary 

None Within 10 km radius circle. 

 

 

(iii) Alternative Sites considered 

No other sites were selected.  

 

(iv) Size or magnitude of operation   

List of Proposed Products  

Sr. 

No. Name of Product 

Existing capacity 

MT/ month 

Proposed capacity 

MT/ month 

Total capacity 

MT/ month 

1  Phenol Formaldehyde Resin  60  325  385 

2  Melamine Formaldehyde Resin  14  81  95 

3  Urea Formaldehyde Resin  ‐‐  550  550 

             Please refer Annexure 4  & Annexure – 10 for more details    

PFR

RB Polymers Ltd.                                                                                                                          Page 4 of 13  

 

List of Raw Materials 

Sr. No.  Name of Raw Materials Existing Quantity 

(MT/Month) 

Proposed 

Quantity 

(MT/Month) 

Total Quantity

(MT/Month) 

 1  Phenol  23.00 125.00  148.00

2  Melamine  4.90 28.35  33.25

3  Urea  ‐‐ 137.50  137.50

4  Formaldehyde (37%) 38.30 621.34  659.64

5  Methanol  14.30 77.20  91.50

6  Caustic Flakes  0.21 1.94  2.15

7  Acetic Acid  ‐‐ 0.55  0.55

 

(v) Project description with process details 

Details of manufacturing process are given in Annexure‐ 5 of Form‐ 1. 

 

(vi) Raw material required along with estimated quantity 

Details of raw material and its consumption are given in Annexure‐ 4 of Form‐ 1.  

(vii) Resource  optimization/  recycling  and  reuse  envisaged  in  the  project,  if  any,  should  be 

briefly outlined. 

Latest process  technology will be adopted as available  in market with optimum  resources 

requirement with highest yield and  less waste and pollution generation. In addition to this, 

all the feasible cleaner production technologies will be adopted.  

 

(viii) Availability of water its source, Energy/ power requirement and source should be given. 

Energy/power  requirement  after  total  expansion  will  be  350  KVA  [275  KVA  Existing  

+ 75 KVA Proposed] which will be procured through Uttar Gujarat Vij Company Limited. 

 

The total after expansion fresh water requirement will be 27.3 KL/day [Existing‐11.26 KL/day 

+ Proposed‐ 17.20 KL/day] which will be fulfilled by own Borewell.  

 

(ix) Quantity  of  wastes  to  be  generated  (liquid  and  solid)  and  scheme  for  their 

Management/disposal  

Hazardous Waste Generation and Disposal  

Details of hazardous waste generation and its disposal are given in Annexure‐ 6 of Form‐ 1.  

 

Wastewater Generation and Disposal Facility 

Details of domestic as well as  industrial wastewater generation and  its disposal are given  in 

Annexure‐ 8 of Form‐ 1. 

 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 5 of 13  

 

(x) Schematic representations of the feasibility drawing which give information of EIA purpose 

  

 

1. Site Analysis 

(i) Connectivity  

Nearest railway station  Chharodi Railway Station 3.70 Km 

Nearest state highway  State Highway 17 0.24 Km 

Nearest airport   Ahmedabad Airport 32.50 Km 

 

(ii) Land Form, Land use and Land ownership. 

Proposed Expansion project site will be carried out within the existing project site where presently 

existing products are manufactured according to the NOC/CCA issued by Gujarat Pollution Control 

Board. 

PFR

RB Polymers Ltd.                                                                                                                          Page 6 of 13  

 

(iii) Existing Land Use Pattern 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 7 of 13  

(iv) Topography Map 

 

Project Site

PFR

RB Polymers Ltd.                                                                                                                          Page 8 of 13  

(v) Existing Infrastructure 

(1) Nearest railway station: Chharodi railway station is 3.70 km away from the project site 

(2) Nearest highway: State Highway 17 is 0.24 km away from the project site. 

(3) Nearest airport: Ahmedabad Airport is 32.50 km from the project site. 

(4) Power: 350 KVA from Uttar Gujarat Vij Company Limited. 

(5) Water: Source of the water will be a borewell. 

(6) Basic amenities: Telephone, Bus Stop & Road  facilities are available  in nearby Village 

Iyava and Sanand Taluka 

 

(vi) Soil classification of Ahmedabad District 

 

The soils found in the district are mostly of Black soil, Goradu soil, Kyari and Rocky soil. 

 

Goradu Soils 

Goradu soils vary from fertile brown to sandy loam and are found in City, Daskroi and parts 

of Sanand, Dholka and Viramgam talukas. This soil is mostly fertile and responds very well 

to irrigation and manuring. Practically all kinds of crops can grow on this soil.  

 

Kyari 

Kyari soils are found in several parts of City, Daskroi, Sanand, Dholka and Viramgam taluka. 

It  is  the most  fertile  soil with  very  good moisture  and  retentive  capacity. Well  known 

varieties  of  paddy  such  as  Pankali,  kamod,  Jirasar,  Sukhvel,  Sutarsal  and  Basumati  are 

grown on this soil. 

 

(vii) Climate data from secondary source 

 The district has extreme climate and wide variation in temperature is observed. 

Seasons: 

The  climate  of  the  district  is  characterised  by  hot  summer  and  general  dryness  except 

during  the  southwest monsoon  seasons. The year can be divided  into  four  seasons. The 

period  from March  to May  is  the hot season  (summer)  followed by  southwest monsoon 

from  June  to  September.  October  and  November  constitute  the  post‐monsoon  or 

retreating monsoon  season. The cold  season  (winter)  starts  from December and ends  in 

February.  

 

Temperature: 

The mean maximum temperature ranges between 28.4 0C during January to 41.8 0C during 

May and the mean minimum temperatures vary between 11.7ºC during January and 27ºC 

during June. 

 

Winds: 

Winds are generally  light with some strengthening  in  force  in summer and  in  the south‐

west monsoon season. During South west monsoon winds are generally SW to W. during 

PFR

RB Polymers Ltd.                                                                                                                          Page 9 of 13  

end of monsoon NW winds also starts. Wind direction  is between NW & NE  in morning; 

between SW & NW  in afternoon  in February & March. Rest of summer wind direction  is 

between SW & NW. 

 

Rainfall: 

The annual rainfall is received during SW monsoon season from June‐September, with July 

being the highest rainfall month. Average annual rainfall is 500‐1000 mm. 

 

(viii)  Social Infrastructure available.  

Ahmedabad  city  is  near  to  project  site.  The  social  infrastructure  of  district  has  good 

education, health and other facilties. 

 

Education 

There are 2373 primary, 1293 secondary and higher secondary schools in the district along 

with major colleges such as 

Indian Institute of Management (IIM) 

National Institute of Design (NID) 

Nirma education & Research Foundation (NERF) 

National Institute of Fashion Technology (NIFT) 

Indian Institute of Packaging 

Mundra Institute of Communications, Ahmedabad (MICA) 

Center for Environment Planning & Technology (CEPT) 

Gujarat National Law University (GNLU) 

Applications Center of the Indian Space Research Organisation (ISRO) 

Apparel Export Promotion Council (AEPC) 

 

Various  Industrial Training  Institutes provide  training  in areas  like electronics,  instrument 

and motor mechanic, wielding, dress making, tailoring and cutting, painting, stenography, 

carpentry and Wood working, oil engine and tractor repairing and others. 

 

Health 

The  district  has  43  primary  healthcare  centres,  9  community  healthcare  centres,  18 

government, 8 municipal and 6 government aided hospitals. 

Ahmedabad hosts some of the best private hospitals  in the State such as Apollo Hospital, 

Sterling Hospital, Krishna Heart Centre and Gujarat Cancer Society which have the facility 

and the expertise to provide the best health services 

 

Apollo hospital  in Ahmedabad  specialises  in  cardiology, orthopaedics, urology, oncology, 

nephrology,  gastroenterology  and  has  the  largest  Dialysis  Unit  with  in‐house  Reverse 

Osmosis Plant. 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 10 of 13  

Sterling  is a multi‐super  specialty  corporate hospital  situated  in Ahmedabad. With a net 

worth of over INR 100 crores (USD 23.8 million), Sterling has state of the art infrastructure 

to provide high quality services across a range of specialties. 

Krishna Heart Centre, one of  the  leading medical service providers,  is  the multi‐specialty 

hospital present in the district. 

 

2. Planning Brief 

 

(i) Planning  Concept  (type  of  industries,  facilities  transportation  etc)  Town  and  Country 

Planning/Development authority Classification. 

It is chemical manufacturing industry located in Ahmedabad district. Total available area is 

10,407.46 m2 out of  it 3,453.21 m2 area has been provided as a greenbelt area.  Industry 

proposed expansion to manufacture Phenol Formaldehyde Resin, Melamine Formaldehyde 

Resin and Urea Formaldehyde Resin. 

Further  the proposed activities will  take care of all  the  rules and  regulation of  statutory 

authority and provide the control measures and devices to achieve the standard norms. 

(ii) Population  

 

Description   No. 

Population  Total : 72,14,225 Person 

  Male : 37,88,051 Person 

  Female: : 34,26,174 Person 

Population density  308 persons per sq. km. 

Village Population  Total: 11,11,178 Person 

Urbanised Population  Total: 60,64,047 Person 

Population increase rate  N.A 

Male‐ Female ratio  1000 : 904 

Scheduled Caste population  7,59,483 Persons 

Scheduled Tribe population  89,138 Persons 

 

(iii) Land use planning (breakup along with green belt etc). 

 

Sr. 

No. Particular   Area (m2) 

1  Built Up Area 4,447.87 

2  Green belt area 3,453.21 

3  Open/ Road area 2,506.38 

Total 10,407.46 

PFR

RB Polymers Ltd.                                                                                                                          Page 11 of 13  

(iv) Assessment of Infrastructure Demand (Physical & Social). 

Surrounded villages in 10 km area from the project site are having all the necessary physical 

and  social  infrastructure  facilities  due  to  agricultural  activities,  animal  husbandry  and 

industrial development within the area as well the nearby Sanand Taluka.  

 

(v) Amenities/Facilities. 

All the basic amenities/facilities such as power connection & power back‐up, drinking water, 

internal roads, water & wastewater treatment plant etc. will be provided. 

 

3. Proposed Infrastructure 

a. Industrial Area 

Industry has provided 4,447.87m2 built up area  for  industrial process/manufacturing activity 

which provides all needed facility including proper ventilation, safe handling system, etc.   

 

b. Residential Area 

Industry has provided labor quarter for their labors and provides all basic facilities to them. 

 

c. Green Belt. 

3,453.21 m2  areas  have  developed  for  greenbelt  development.  In  addition  to  this,  project 

proponent will  participate  in  greenbelt  development  programs  in  nearby  areas  under  their 

CER. 

 

d. Social Infrastructure 

The proponent will provide social infrastructure facilities within 10 km radius of the proposed 

project. 

 

Education  Facilities:  ‐ Many  Facilities  for  village  schools  like  game  kits,  drawing  kits,  table‐

chairs; school construction (classroom/toilet/school boundary), ceiling fans/ coolers or books 

for school library are proposed. 

 

Health Facilities: ‐ Assistance to existing health facilities  in nearest Hospital, for  improvement 

in health facilities or services. 

 

e. Connectivity (Traffic and Transportation Road / Rail / Metro / Water ways  

Proposed project  site  is  located  adjacent  to  State Highway  17  and well  connected  to  the 

internal  roads  and  highways.  The  site  is well  connected  to  all major  cities  through  State 

highways and National highways. 

 

f. Drinking Water Management 

After  total  expansion  of  project,  domestic water  approx.  3.3  KL/day  [Existing‐1.6  KL/day  + 

Proposed‐ 1.7 KL/day] will be consumed for domestic purpose.  

 

 

PFR

RB Polymers Ltd.                                                                                                                          Page 12 of 13  

g. Sewerage System. 

Domestic wastewater 2.7 kl/day [Existing‐1.3 KL/day + Proposed‐ 1.4 KL/day] will be treated in 

Sewage Treatment Plant (STP).   

 

h. Industrial Wastewater Management. 

Waste water  from  Boiler  blow  down,  cooling  tower  blow  down,  Process waste water  and 

Washing water will be collected  in Collection cum Neutralization Tank. Then wastewater will 

be given Chemical Oxidation treatment. Then Effluent will be taken to Nutch filter/Filter Press 

for  sludge  separation.  Separated  dried  sludge will  be  collected,  stored  and  disposed  of  at 

approved TSDF site. Filtrate water from Filter press will be taken in the holding tank and then 

Effluent will be evaporate  in  the  Steam based Evaporator. We will use  simple  Steam based 

evaporator. Heat will be given by Steam boiler. The capacity of evaporator will be around 350 

L/Hr considering worst scenario of effluent quantity. Hence we shall maintain Zero Discharge. 

 

i. Solid/Hazardous Waste Management 

Details of hazardous waste generation and its disposal are given in Annexure‐ 6 of Form‐ 1. 

 

j. Power Requirement & Supply / source 

Power requirement  for the existing project  is approx. 275 KVA and after expansion  it will be 

350 KVA, which will be obtained from UGVCL. 

 

4. Rehabilitation and Resettlement (R & R) Plan 

Not applicable. 

 

5. Project Schedule & Cost Estimates 

 

(i) Likely date of start of construction and likely date of completion 

(Time schedule for the project to be given) 

Existing project has already been constructed and is in operation phase. Construction work 

related  to  proposed  expansion  of  Resin manufacturing  plant will  be  only  started  after 

obtaining EC. 

(ii) Estimated project cost along with analysis in terms of economic viability of the project. 

Total after proposed expansion project cost will be approx. 550 lakh [Existing project cost 

‐ 515 lakh + Proposed Expansion project cost – 35 lakh]. 

                                              ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐