INDEX
1. OVER VIEW:- 4
2. GETTING INTO THE CONFIGURATION AREA OF SAP 8
3. MASTER DATA CONFIGURATION - BOM 12
3.1 Define BOM Usage 12
3.2 Define Default Values for item status 16
3.3 Define Allowed Material type for BOM Header 20
3.4 Define BOM Status 23
3.5 Define Item Category 26
3.6 Define Allowed item type for BOM Item 30
3.7 Define Explosion types 33
3.8 Define Order of Priority 36
3.9 Define Application 40
3.10 Define Alternative Determination for Multiple BOM 44
3.11 Alternative determination in related application Area 46
3.12 Define User-specific setting 47
4. WORK CENTER 50
4.1 Define Work center Category 51
4.2 Define Field Selection 54
4.3 Define Task List usage 58
4.4 Define Parameters 61
4.5 Define Standard Value 65
4.6 Determine Person Responsible 69
4.7 Define Control Key 71
5. CAPACITY PLANNING 76
5.1 Define Capacity Category 76
5.2 Determine Capacity Planner 78
5.3 Define Shift Sequence 81
5.4 Define Formula Parameters for Work centers 88
5.5 Define Formula for Work centers 91
5.6 Define Factory calendar 95
5.7 Define Default Capacity 106
5.8 Define Work center screen sequence 109
6. ROUTING 112
6.1 Define Standard value description in operation over view 113
6.2 Define Routing Status 115
6.3 Define Task List usage 117
6.4 Define Reduction Strategy 119
6.5 Define User Fields 123
6.6 Define Routing Selection Automatic 127
7. SUMMARY:- 130
1. Over view:-
Production Planning module configuration and relevant
reports are demonstrated in this book.
PP module contains three types of manufacturing methods.
o Discrete
o Repetitive
o Process Industries.
Discrete: -
Discrete production method is applicable to the manufacturing
setup where small lots are manufactured with frequentchanges in the settings.
Manufacturing is accounted through Production orders.
Repetitive: -
This method is applicable, where products are manufactured
with least change or no change in the manufacturing processover a long period of time.
Manufacturing is accounted through backflush.
Process Industries: -
It is similar to the Discrete but instead of routing, It usesmaster recipe where in Process messages are maintained.
It is more appropriate to the food industries and processing
units where instructions are used during the process.
Manufacturing is accounted through process orders.
Configuration setting in PP module can be classified as below.
• Master Data related settings
• Planning Related Settings
• Production Execution related settings
We will discuss about the Master data related configurationsetting in detail.
Important Master data in PP module are
• Bill Of Material
• Work center
• Routing
Bill Of Material (BOM):-
BOM can be defined as “a list of required components alongwith the required quantity essential to make any product”.
Important Technical details related to BOM are
Application of BOM
Usage of BOM
Status of BOM
Selection of BOM
Configuration setting related to BOM will enable to align theBOM master data in line with the business requirement blue
print document.
Work Center:-
Machines, group of labour, processing unit are defined as
work center in SAP.
Work center contains the
Capacity Requirements
Scheduling details
Costing details
Configuration setting related to work center will enable todefine the SAP system according to the business requirementblue print document.
Routing:-
Sequence of operation, work centers to be used and theduration required for each operation to manufacture the
product is defined in routing.
Important Technical details related to Routing are
Usage of Routing
Status of Routing
Selection of Routing
Configuration settings related to Routing will enable to alignthe Routing master data in line with the business requirement
blue print document.
Friends, the configuration settings related to each master dataare explained in detail.
Example:-
BOM
Item category configurationAutomatic alternate selection of BOM
Configuration of BOM usageConfiguration of allowed item type for BOM
Work Center
Configuration of field selection in work centerConfiguration of formula to schedule and calculate cost
Configuration of standard value keyConfiguration of shift sequence
Routing
Configuration of Automatic Routing selection
Configuration of Routing usageConfiguration of reduction strategy
Configuration of user defined fields in Routing
2. Getting into the Configuration area of SAP
BACKGROUND
To make the configuration in SAP, one has to haveauthorization to perform transaction in configuration mode.
It is the place where every details are maintained to make the
transaction happen as per the business mapping.
SCENARIO
It is required to configure various settings in SAP.
INSTRUCTIONS
To do configuration, first one has to logon to the system, and
go to the IMG mode. How to logon to IMG mode is explainedbelow. From next document onwards, it is mentioned as IMG.
How to get in to the SAP IMG mode?
1. Type spro in the SAP main screen dialog box,
2. Click