Orange County Water District Budget Report
Fiscal Year 2020-21
Board of Directors
Vicente Sarmiento, ESQ. President
Cathy Green Stephen R. Sheldon 1st Vice President 2nd Vice President
Denis R. Bilodeau, P.E.
Jordan Brandman
Dina L. Nguyen, ESQ
Kelly E. Rowe, CFM, P.G., C.E.G, C.H.
Tri Ta
Roger C. Yoh, P.E.
Ahmad Zahra
♦ ♦ ♦ ♦ ♦ ♦ ♦
Michael R. Markus, P.E. General Manager
Table of Contents
ORANGE COUNTY WATER DISTRICT BUDGET REPORT
FISCAL YEAR 2020-21
OCWD HISTORY AND CHARACTER
SECTION 1 - GENERAL MANAGER’S MESSAGE
SECTION 2 - SUMMARIES COMBINED SUMMARY SOURCES AND USES OF FUNDS GENERAL FUND BUDGET SUMMARY GENERAL FUND BUDGET COMPARISON DISTRICT MEMBERSHIPS OCWD STAFFING HISTORY KEY FINANCIAL METRICS
SECTION 3 - OPERATIONS AND COST CENTER DESCRIPTIONS
OCWD ORGANIZATIONAL STRUCTURE COST CENTER PROFILES
SECTION 4 - DEBT SERVICE
SECTION 5 - OTHER POST EMPLOYMENT BENEFITS
SECTION 6 - WATER PURCHASE
SECTION 7 - BASIN EQUITY ASSESSMENT
SECTION 8 - CAPITAL IMPROVEMENT PROGRAM
SECTION 9 - NEW EQUIPMENT (FIXED ASSETS) SUMMARY
NEW EQUIPMENT BUDGET FUNDED BY OPERATING REVENUES SECTION 10 - REPLACEMENT AND REFURBISHMENT
SECTION 11 - COST CENTER DETAIL
GENERAL FUND BUDGET COST CENTER DETAIL ACRONYMS AND ABBREVIATIONS
Orange County Water District FY 2020-21 Budget Report
ORANGE COUNTY WATER DISTRICT
HISTORY AND CHARACTER
The District receives an average of only 13 to 15 inches of rainfall annually, yet sustains a population of approximately 2.4 million people. The residents and businesses within the District have two primary sources of drinking water. One source is a natural underground reservoir, called the Orange County groundwater basin. The other source, referred to as imported water, comes from Colorado through the Colorado River Aqueduct and from the Sacramento/San Joaquin Delta in Northern California through the State Water Project.
The groundwater basin was used by early settlers to supplement flows from the Santa Ana River. As the area developed into a thriving agricultural center, the increased demand upon the subsurface water by the county’s many wells resulted in a gradual lowering of the water table. In response, the Orange County Water District was formed in 1933 by a special act of the California State Legislature. OCWD manages the groundwater basin that underlies the northwest half of the county, supplying a significant percentage of the District’s total water demand. The remaining demand is obtained through the Colorado River Aqueduct and State Water Project via the Metropolitan Water District of Southern California and the Municipal Water District of Orange County.
DISTRICT VITAL STATISTICS
Date of Enactment: 1933 Form of Government: Special District of the State of California Area (square miles): 381 Employees (full-time equivalent): 221.5
Major Groundwater Producing Agencies:
Anaheim, City of Mesa Water District Buena Park, City of Newport Beach, City of East Orange County Water District Orange, City of Fountain Valley, City of Santa Ana, City of Fullerton, City of Seal Beach, City of Garden Grove, City of Serrano Water District Golden State Water Company Tustin, City of Huntington Beach, City of Westminster, City of Irvine Ranch Water District Yorba Linda Water District La Palma, City of
April 15, 2020 Board of Directors Orange County Water District Subject: BUDGET FOR FISCAL YEAR 2020-21
OVERVIEW
I am pleased to present to the Board of Directors the recommended budget for fiscal year (FY) 2020-21. The budget includes general fund expenditures, debt service, water purchases, refurbishment and replacement items, and capital projects for Board review and consideration. Development of the draft budget began in December 2019 with Board review of the preparation schedule. The District’s general fund budget has been subdivided into 21 cost centers to provide greater detail. During the month of January, I met with all of the District’s managers in preparing the budgets for these cost centers and made $2.3 million in reductions from what they proposed. The draft budget was reviewed at the Board meeting on March 4. Additional meetings and workshops were held on the budget through April with the Board and Groundwater Producers (Producers). The final draft budget presents the culmination of these meetings and workshops, along with a new review of the budget by me as General Manager, which lead to $37 reduction per acer feet (af) in proposed Replenishment Assessment (RA) from $524 af to $487 af and the Basin Pumping Percentage (BPP) of 77%. The budget describes activities and projects that are primarily a continuation of the District’s existing workload. We expect the Groundwater Replenishment System (GWRS) to produce 97,000 acre-feet of water supplies. The budget is based on a Basin Production Percentage (BPP) of 77 percent, which corresponds to approximately 246,800 acre-feet of pumping in FY 2020-21. Highlights and assumptions of the proposed budget include:
• This plan assumes a slightly dry hydrology.
Board of Directors April 15, 2020 Page 2 of 8
• Budget reflects no purchase of MWD untreated full-service water. • This plan includes paying $36.3 million for producers PFAS treatment
facilities and test project. • Decrease in General Fund expenses by approximately $2 million from
the prior year. • No cost of living adjustment and three percent merit increase based
upon employee performance have been budgeted. • The District’s full-time head count will increase from 220½ to 221½. • The groundwater basin’s projected June 30, 2020 accumulated
overdraft is estimated at approximately 215,000 acre-feet (af) and is expected to decrease by approximately 11,000 af to 204,000 af by June 30, 2021.
The recommended budget would maintain the Replenishment Assessment (RA) at $487 per acre-foot for FY 2020-21. Table 1 provides a summary of the proposed budget:
Table 1 2020-21 PROPOSED BUDGET
EXPENDITURES BUDGETED FY 19-20
($ MILLIONS)
PROPOSED FY 20-21
($ MILLIONS) General Fund 73.1 71.1 Debt Service 37.8 36.0 Water Purchases 55.9 9.1 Contribution to Water Fund Reserve 3.7 - New Equipment 0.6 0.5 Capital Improvement Program 60.6 97.9 Refurbishment and Replacement Expenditures 14.6 14.2 Contribution to R&R fund 3.3 - Retiree Health Insurance Trust 1.5 1.5
Total $251.1 $230.3
BUDGET DETAILS
The Orange County Water District strives to improve the efficiency of all aspects of its operations in its continuing efforts to increase the water quality and reliability of Orange County’s local water resources at the lowest possible cost. The FY 2020-21 budget reflects the wide range of programs necessary to accomplish the District's primary mission of proactively managing the Orange County groundwater basin. The following sections provide highlights of the budget.
Board of Directors April 15, 2020 Page 3 of 8 EXPENDITURES GENERAL FUND BUDGET - $71.1 MILLION
The District has 21 cost centers and their proposed activities for the year are provided in detail in later sections of this document. The District continually attempts to minimize increases to the General Fund by taking actions such as limiting administrative personnel, reviewing operations, maximizing outside funding opportunities, and reviewing all vacant positions before they are refilled. The General Fund budget contains the expenses of operating a number of facilities including:
• The GWRS Advanced Water Purification Facility
• Green Acres Project (GAP)
• Talbert seawater barrier injection facilities
• Water quality monitoring well maintenance and sampling
• Laboratory
• Recharge operations in Anaheim and Orange
• Alamitos seawater barrier injection facilities
• Prado Wetlands and water conservation programs
The District’s total salary and benefit costs are projected to be $35.6 million, which is allocated as follows: $34.5 million to the General Fund and $1.1 million to capital projects. As described in the Work Plans, the budget proposes a headcount of 221½.
WATER PURCHASE BUDGET - $9.1 MILLION
The proposed FY 2020-21 water budget is $9.1 million and calls for not purchasing any Metropolitan Water District (MWD) untreated full-service water due to the PFAS issue. Staff expects groundwater pumping to decline by about 90,000 acre-feet due to the State Division of Drinking Water establishing a 10 ppt PFOA Response Level. To offset this decline in revenues and maintain a balanced budget, the District would not purchase any MWD untreated water to recharge into the basin.
Debt Service Budget - $36.0 Million The District will have approximately $700 million in outstanding debt at the start of the budget year. This year’s total debt service budget will be $36.0 million, comprised of $16.53 million of fixed rate debt, $3.62 million of variable rate debt, $2.7 million of short-term notes, $1.27 million of swap payments, $10.16 million in SRF debt payments, $0.8 million of commercial paper debt and $0.95 million
Board of Directors April 15, 2020 Page 4 of 8
for debt administration. Variable rate debt interest cost has been budgeted at 2.75 percent. The District bonds hold very high credit ratings of AAA from Standard & Poor’s and Fitch along with an Aa1 rating from Moody’s. The ratings assigned by these three agencies have a direct impact on the District’s ratepayers. The District’s high credit ratings translate into lower annual interest payments and reduced letter of credit fees on its variable rate demand obligations and commercial paper.
RETIREE HEALTH INSURANCE TRUST FUND - $1.5 MILLION The District conducted a biennial actuarial study in 2018 to determine the estimated accrued liability of providing the retiree medical benefit. The annual cost to fund the unfunded liability over 25 years plus the cost attributable to the current year of service (Actuarially Determined Contribution or ADC) was estimated by our actuary at $1.5 million. At the end of FY 2019-20, the trust fund is expected to have a value of approximately $21 million. The recommended FY 2020-21 budget includes $1.5 million to continue fully funding the District’s ADC. This cost is also referred to as Other Post Employment Benefits (OPEB).
Replacement and Refurbishment (R&R) Fund Budget - $14.2 Million The District has over one billion in existing plant and equipment. These facilities annually depreciate and require replacement and refurbishment to maintain their capabilities. In October 1998, the District formally established an R&R Fund. In 2004 the R&R program was downsized to only include infrastructure type assets. The amount of money annually transferred into the R&R program was reduced from $4.5 million to $2.8 million with this change. The annual transfer amount has been growing by seven percent annually to provide sufficient funds to meet future expected R&R expenditures. The annual contribution also increased by $4.5 million with the construction of the GWR System. The total contribution in FY 2020-21 would be $19.2 million. The R&R program and model was formally reviewed and updated in 2011. Expenditures from the fund vary significantly each year depending upon which District assets have reached the end of their useful life and need to be replaced or which assets can have their lives extended by refurbishing them. In FY 2020-21, the proposed R&R expenditures are $14.2 million. The R&R Program Fund balance is expected to stay the same from an estimated $74.2 million on June 30, 2020 to $74.2 million on June 30, 2021, as a result of a $5 million draw on the R&R reserve to reduce the FY 2020-21 RA.
Capital Projects Budget - $97.9 Million
Board of Directors April 15, 2020 Page 5 of 8
The District prepares a multi-year CIP budget to support its mission. The CIP budget spans five years and provides expected capital expenditures over the 5-year period. The CIP budget is comprised of nineteen projects totaling$97.9 million in FY 2020-21. These projects are funded through long-term debt,grants and the District will be funding $27.2 million of the CIP budget with RArevenue or current revenue (PAYGO) rather than borrowed funds. Details of theCIP are provided in Section 8 of the budget book.The projects for example are necessary to:
• Support basin production by increasing recharge capacity andoperational flexibility.
• Protect the coastal portion of the basin.The CIP program and the capitalization of expenditures comply with the adopted District policy in October 2000, which: (1) defines the types of expenditures that can be capitalized; and (2) uses long-term debt to fund the projects. Each project included in the CIP must be individually reviewed and approved by the Board prior to design and construction.
NEW CAPITAL EQUIPMENT ITEMS - $0.5 MILLION
This budget includes small equipment items such as laboratory equipment, machines, tools, automobiles, computers and software, pumps, equipment, etc. These items are funded using current revenues. A detailed list of these items is provided in Section 9 of this document.
REVENUES ASSESSMENTS - $119.8 MILLION RA; $1.8 MILLION BASIN EQUITY ASSESSMENT
All water pumped out of the groundwater basin will be assessed the RA on a dollar per acre-foot basis of $487. The RA is expected to generate $119.8 million in revenue for FY 2020-21 based on 246,800 acre-feet of total anticipated basin production at a 77 percent BPP. The Basin Equity Assessment (BEA) rate is calculated for each Producer based on the treated full service MWD water rate and each Producer’s individual energy cost to pump groundwater. The BEA is assessed annually in September for all groundwater production above the BPP. For FY 2020-21, $1.8 million of BEA revenue is expected to be received.
AD VALOREM PROPERTY TAXES – $28.2 MILLION
The District expects to receive approximately $28.2 million in property taxes collected within the service area.
Board of Directors April 15, 2020 Page 6 of 8 The County of Orange assesses and collects the taxes and transfers them to the District at various times during the year. This revenue source is dedicated to the District’s debt service expenditure.
INVESTMENT REVENUE – $4.0 MILLION
The District’s cash reserves generate investment revenues. The majority of cash reserves are invested in short-term securities. Investment revenues have been estimated at $1.3 million for the General Fund. Approximately $0.9 million of the investment revenues are generated by and for the R&R program, $0.2 million will be generated from water and PAYGO funds, and another $1.6 million of the investment revenues are generated by and for the restricted investments from short term notes issued for GWRSFE project.
MISCELLANEOUS REVENUES – $6.0 MILLION
MISCELLANEOUS REVENUES ARE COMPRISED OF NUMEROUS ITEMS INCLUDING:
Water sales from the Green Acres Project (GAP) $1.6 M Annexation fees $2.4 M Rents & leases $1.2 M Other grants and misc. items $0.8 M Total $6.0 M
RESERVES
The District maintains cash reserves to ensure its financial integrity so that the groundwater basin can be successfully managed and protected. Cash reserves ensure that:
• The District has sufficient funds for cash flow purposes. • Funds are available for unexpected events. • Funds are available to make necessary replacements and
refurbishments to the District’s infrastructure. • The District has access to debt programs with very low interest cost. • A financial hedge is in place to balance the amount of outstanding
variable rate debt the District has issued in case interest rates rise. The District has developed policies which result in the establishment of the reserve and operating fund levels shown in Table 2. The net effect of the proposed budget would be an decrease of $18.4 million to total District reserves
Board of Directors April 15, 2020 Page 7 of 8 with no change in the Replacement and Refurbishment fund, $0.4 million increase in ground water contamination cleanup fund, no change in water reserve fund, $16.0 million decrease in the Paygo fund, an increase of $0.2 million in the Operating Reserve fund, and $3.0 million decrease in the Operating fund.
Table 2 Operating Reserves Levels
Reserve
Beginning Projected Year-end Projected Year-end FY19-20
($/million) FY 19-20 ($/million) FY 20-21 ($/million) R&R Fund 68.4 74.2 74.2 Toxic Cleanup Reserve Fund 4.0 4.0 4.0 G.W. Contamination clean up 23.3 26.1 26.5 Contingencies Reserve Fund 3.0 3.0 3.0 SRF Loan Reserve Fund 10.6 1.1 1.1 Water Reserve Fund 11.6 0 0 Paygo Fund 28.1 34.5 18.5 Operating Reserve Fund (15% of operating budget)
28.9
28.9 29.1
Sub-total 177.9 171.8 156.4 Operating Fund Operating Fund 27.2 30.5 27.5
TOTAL 205.1 202.3 183.9
COST CUTTING EFFORTS Staff has been and will continue to work to reduce District costs to minimize rate increases. Recent examples of cost cutting efforts include:
• Locked in low electricity cost with power supplier via Direct Access. • Utilize interns more to avoid hiring full-time employees. • The District continues negotiating payment term discounts with vendors. • Extended the life of membranes from 5 to 7 years. • Refinancing of 2013A COPs and SRF loan realizing interest savings for
the District. • The GWRS RO cleaning process has been optimized to reduce citric acid
costs as membranes age.
Board of Directors April 15, 2020 Page 8 of 8
• Utilize Single Use Accounts to pay vendors. • Applied for low cost WIFIA loan to fund GWRS final expansion. • Utilized CP program to minimize MWD rate increase on FY 2017-18 in-
lieu program. • Elimination of reserve fund for state revolving fund loan for GWRSFE
project.
CONCLUSION
The proposed FY 2020-21 budget represents an expenditure plan that is fiscally sound and incorporates significant budget reductions while supporting necessary programs. As part of the District’s commitment to provide local groundwater producers with a reliable, high-quality water supply at the lowest reasonable cost, the following areas will continue to be emphasized:
• Minimizing administrative and overhead type costs; • Protect the coastal portion of the groundwater basin; • Increase local water supplies where economical; and • Maintain the financial health and integrity of the District.
Respectfully submitted, Michael R. Markus, P.E. General Manager
Section 2 Summaries
Combined Summary Sources and Uses of Funds
General Fund Budget Summary General Fund Budget Comparison
District Memberships OCWD Staffing History Key Financial Metrics
Section 2Summaries
Revenues
Property Taxes 28,200,000$ Replenishment Assessment 119,803,136$ Basin Equity Assessment 1,750,000$ Facility Revenue from Other Agencies (GAP) 1,612,865$ Investment Revenues 3,986,909$ Rent, Royalties and Others 4,377,403$ Draw from Construction Fund/SRFLoans/Debt 70,583,212$ Total Revenues/Others 230,313,525$
Appropriations
General Fund 71,104,532$ New Equipment 523,500$ Water Purchases 9,064,936$ Retiree Health Trust 1,474,000$ Debt Service 36,046,534$ Capital Projects (Debt & PAYGO funded) 97,908,212$ R&R Fund Expenditures 14,191,811$ Total Appropriations 230,313,525$
Orange County Water DistrictCombined SummaryFiscal Year 2020-21
Orange County Water District 2-1 FY 2020-21 Budget Report
So
urc
es
an
d U
se
s o
f F
un
ds
Fis
ca
l Y
ea
r 2
02
0-2
1
Tot
al R
eplen
ishm
ent
Asse
ssm
ent
Bas
in E
quity
As
sess
men
t T
axes
G
AP R
even
ues
Inve
stm
ent R
even
ue
Ren
t & O
ther
s R
eser
ve F
und
Draw
down
/(Con
tribu
tion)
D
ebt
Proc
eeds
T
otal
Ge
ne
ral F
un
d7
1,1
04
,53
2$
63
,82
8,0
58
$
1,6
12
,86
5$
1
,31
1,9
09
$
4
,35
1,7
00
$
7
1,1
04
,53
2$
Ne
w E
qu
ipm
en
t 5
23
,50
0$
52
3,5
00
$
52
3,5
00
$
Wa
ter
Pu
rch
ase
s9
,06
4,9
36
$
7,2
64
,93
6$
1,7
50
,00
0$
5
0,0
00
$
9,0
64
,93
6$
De
bt
Se
rvic
e3
6,0
46
,53
4$
6,2
20
,83
1$
28
,20
0,0
00
$
1,6
00
,00
0$
25
,70
3$
36
,04
6,5
34
$
Re
tire
e H
ea
lth T
rust
1,4
74
,00
0$
1
,47
4,0
00
$
1
,47
4,0
00
$
Ca
pita
l Pro
ject
s (D
eb
t &
P
AY
GO
fu
nd
ed
)9
7,9
08
,21
2$
27
,20
0,0
00
$
12
5,0
00
$
1
5,9
42
,40
7$
54
,64
0,8
05
$
97
,90
8,2
12
$
R&
R F
un
d E
xpe
nd
iture
s1
4,1
91
,81
1$
13
,29
1,8
11
$
90
0,0
00
$
1
4,1
91
,81
1$
23
0,3
13
,52
5$
1
19
,80
3,1
36
$
1
,75
0,0
00
$
2
8,2
00
,00
0$
1
,61
2,8
65
$
3,9
86
,90
9$
4
,37
7,4
03
$
1
5,9
42
,40
7$
54
,64
0,8
05
$
23
0,3
13
,52
5$
Us
es
So
urc
es
Ora
ng
e C
ou
nty
Wat
er D
istr
ict
2-2
FY
202
0-21
Bu
dg
et R
epo
rt
Section 2Summaries
Cost Center # Cost Center
Salaries & Benefits
Services & Supplies
FY 20-21 Proposed
Budget
1010 General Manager’s Office 502,205 1,555,475 2,057,680 1012 Public Affairs 1,240,851 875,950 2,116,801 1016 Information Services 1,755,730 979,000 2,734,730 1018 Board Administration 1,292,968 338,040 1,631,008 1022 Purchasing 706,724 46,500 753,224 1024 Finance 1,979,608 142,500 2,122,108 1030 Human Resources 745,980 235,350 981,330 1034 Safety & Risk Management 393,064 1,166,200 1,559,264 1036 Water Quality 1,795,632 307,400 2,103,032 1038 Laboratory 4,557,062 1,509,600 6,066,662 1040 Research & Development 1,265,585 294,644 1,560,229 1044 Planning and Watershed Management 854,855 671,300 1,526,155 1045 Local Resources 280,360 53,250 333,610 1046 Regulatory Affairs 478,158 296,700 774,858 1050 Water Production/GWR System 9,516,523 22,704,102 32,220,625 1060 Recharge Operations 2,887,887 1,358,430 4,246,317 1062 Wetland Operations 302,594 259,000 561,594 1069 Property Management 121,087 152,500 273,587 1070 Engineering 863,389 44,700 908,089 1075 Hydrogeology 2,217,122 1,948,400 4,165,522 1080 Natural Resources 791,856 1,616,250 2,408,106
Total (Rounded) 34,549,000$ 36,555,000$ 71,105,000$
General Fund Budget SummaryFiscal Year 2020-21
Orange County Water District 2-3 FY 2019-20 Budget Report
Section 2Summaries
Cost Center # Cost Center
FY 2020-21 Proposed
Budget FY 2019-20
Budget Difference
Over(Under)
% Increased or
(Decreased)
1010 General Manager’s Office 2,057,680 2,318,826 (261,147) -11.26%
1012 Public Affairs 2,116,801 2,062,563 54,238 2.63%
1016 Information Services 2,734,730 2,705,809 28,921 1.07%
1018 Board Administration 1,631,008 1,612,412 18,596 1.15%
1022 Purchasing 753,224 757,486 (4,262) -0.56%
1024 Finance 2,122,108 2,124,686 (2,578) -0.12%
1030 Human Resources 981,330 969,302 12,027 1.24%
1034 Safety & Risk Management 1,559,264 1,578,281 (19,016) -1.20%
1036 Water Quality 2,103,032 2,061,431 41,602 2.02%
1038 Laboratory 6,066,662 5,911,905 154,757 2.62%
1040 Research & Development 1,560,229 1,768,080 (207,851) -11.76%
1044 Planning & Watershed Management 1,526,155 2,180,300 (654,145) -30.00%
1045 Local Resources 333,610 333,224 386 0.12%
1046 Regulatory Affairs 774,858 546,331 228,527 41.83%
1050 Water Production/GWR System 32,220,625 31,927,900 292,725 0.92%
1060 Recharge Operations 4,246,317 4,482,797 (236,480) -5.28%
1062 Wetland Operations 561,594 537,674 23,920 4.45%
1069 Property Management 273,587 248,368 25,218 10.15%
1070 Engineering 908,089 1,096,984 (188,895) -17.22%
1075 Hydrogeology 4,165,522 4,349,064 (183,542) -4.22%
1080 Natural Resources 2,408,106 3,525,924 (1,117,818) -31.70%
Total (rounded) $ 71,105,000 $ 73,099,000 $ (1,995,000) -2.73%
General Fund Budget ComparisonFiscal Year 2020-21
Orange County Water District 2-4 FY 2019-20 Budget Report
Section 2Summaries
ORGANIZATION AMOUNT
AMERICAN MEMBRANE TECHNOLOGY ASSOCIATION 825
CHAMBERS OF COMMERCE 5,000
AMERICAN WATER WORKS ASSOCIATION (AWWA) 1,950
ASSOCIATION OF CALIFORNIA CITIES - ORANGE COUNTY (ACC-OC) 5,300
ASSOCIATION OF CALIFORNIA WATER AGENCIES (ACWA) 33,000
ASSOCIATION OF METROPOLITON WATER AGENCIES (AMWA) 4,500
CAL DESAL 5,000
CAL STATE FULLERTON DEMOGRAPHICS 4 x $12,500 50,000
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION (CMUA) 13,500
CALIFORNIA SPECIAL DISTRICTS ASSOCIATION (CSDA) 8,000
GROUNDWATER RESOURCES FOUNDATION (GRA) 1,500
GROUNDWATER FOUNDATION 100
INDEPENDENT SPECIAL DISTRICTS ASSOCIATION (ISDOC) 50
PROFESSIONAL MEMBERSHIPS (ASCE & WEF) 500
SANTA ANA RIVER FLOOD PROTECTION AGENCY (SARFPA) 1,300
SOUTHERN CALIFORNIA ALLIANCE OF PUBLICLY OWNED TREATMENT WORKS 3,000
SOUTHERN CALIFORNIA SALINITY COALITION (NWRI) 10,000
SOUTHERN CALIFORNIA WATER COMMITTEE 5,000
SOUTHWEST MEMBRANE OPERATORS ASSOCIATION 400
WATER ADVISORY COMMITTEE OF ORANGE COUNTY (WACO) 100
WATER EDUCATION FOUNDATION 5,000
WATER RESEARCH FOUNDATION 165,000
CA GROUNDWATER COALITION 9,500
WATEREUSE ASSOCIATION 15,000 TOTAL 343,525
DISTRICT MEMBERSHIPSFISCAL YEAR 2020-21
Orange County Water District 2-5 FY 2019-20 Budget Report
Section 2Summaries
Cost Center FY15-16 FY16-17 FY17-18 FY18-19 FY19-20Proposed FY20-21
General Manager’s Office 5 6 6 3 3 2Public Affairs 7 7 7 7 8 8Information Services 8 9 10 10 10 10Board Administration 3 3 3 3 6 6Purchasing 7 6 6 6 6 6Finance 13 13 13 13 13 13Human Resources 4 4 4 7 5 5Safety & Risk Management 3 3 2 2 2 2Water Quality 12 12 12 12 12 13Laboratory 29 29 30 30 31 32Research & Development 6 7 7 7 7 7Planning & Watershed Management 4 4 4 4 4 4Local Resources 1 1 1 1 1 1Regulatory Affairs 2.5 2.5 2.5 2.5 1.5 2.5Water Production/GWR System 65 64 64 64 63 62Recharge Operations 21 20 20 20 20 20Wetland Operations 3 3 3 3 2 2Property Management 1 1 1 1 1 1Engineering 8 8 8 8 8 8Hydrogeology 12.5 12.5 13.5 13.5 13.5 13.5Natural Resources 3.5 3.5 3.5 3.5 3.5 3.5
218.5 218.5 220.5 220.5 220.5 221.5
OCWD Headcount
0
50
100
150
200
250
OCWD Headcount
Orange County Water District 2-6 FY 2019-20 Budget Report
Sec
tio
n 2
Su
mm
arie
s
2017
2018
2019
2020
Bud
get
2021
Bud
get
TO
TA
L C
AS
H A
ND
IN
VE
ST
ME
NT
S (
UN
RE
ST
RIC
TE
D)
145,
547,
170
$
15
9,80
1,34
8$
20
5,11
5,86
1$
219,
700,
000
$
19
0,20
0,00
0$
TO
TA
L O
PE
RA
TIN
G E
XP
. AN
D D
EB
T S
VE
FR
OM
BE
LO
W99
,752
,609
102,
492,
689
114,
253,
800
11
2,39
2,90
2
108,
565,
534
D
AYS
CA
SH R
ATI
O53
356
965
571
363
9
CO
VE
RA
GE
RA
TIO
:R
eple
nish
men
t ass
essm
ents
120,
120,
803
$
13
6,21
2,80
5$
13
8,77
9,38
5$
159,
029,
130
$
11
9,80
3,13
6$
CU
P r
even
ue41
,500
-
-
-
-
Rec
laim
ed w
ater
rev
enue
10,6
06,0
06
10
,933
,858
10,2
10,3
32
1,
565,
888
1,
612,
865
P
rope
rty
tax
25,4
32,8
03
27
,060
,303
28,2
76,8
98
27
,000
,000
28,2
00,0
00
L
egal
set
tlem
ent r
even
ue69
1,03
6
4,
957,
292
40
,500
,000
-
-
Ren
tal i
ncom
e, n
et o
f ex
pens
es1,
153,
435
1,
488,
004
1,
549,
580
1,
243,
000
1,
094,
351
In
vest
men
t rev
enue
1,
402,
267
2,
556,
061
3,
788,
863
2,
088,
000
3,
986,
909
O
ther
rev
enue
s2,
978,
286
3,
269,
258
4,
139,
709
3,
836,
228
3,
283,
052
T
otal
YT
D r
even
ues
162,
426,
136
18
6,47
7,58
1
22
7,24
4,76
7
194,
762,
246
15
7,98
0,31
3
Bud
gete
d an
nual
rev
enue
less
YT
D r
even
ue
-
-
-
-
-
Ope
rati
ng e
xpen
ses
incl
udin
g lit
igat
ion
expe
nses
69,9
38,7
31
73
,612
,185
85,1
41,4
33
75
,531
,000
72,5
78,5
32
O
pera
ting
exp
ense
s bu
dget
ed f
or th
e re
st o
f th
e FY
-
-
-
-
-
T
otal
Exp
endi
ture
s69
,938
,731
73,6
12,1
85
85
,141
,433
75,5
31,0
00
72
,578
,532
Net
rev
enue
s92
,487
,405
112,
865,
396
142,
103,
333
11
9,23
1,24
6
85,4
01,7
81
Ann
ual d
ebt s
ervi
ce29
,813
,878
28,8
80,5
04
29
,112
,366
36,8
61,9
02
36
,046
,534
ALL
-IN
AD
S C
OVE
RA
GE
RA
TIO
3.1
3.9
4.9
3.2
2.4
OR
AN
GE
CO
UN
TY
WA
TE
R D
IST
RIC
T
KE
Y F
INA
NC
IAL
ME
TR
ICS
JUN
E 3
0, 2
017
TH
RO
UG
H J
UN
E 3
0, 2
021
Ora
ng
e C
ou
nty
Wat
er D
istr
ict
2-7
FY
201
9-20
Bu
dg
et R
epo
rt
SECTION 3 TABLE OF CONTENTS
Orange County Water District FY 2020-21 Budget Report
OPERATIONS AND COST CENTER DESCRIPTIONS TABLE OF CONTENTS
PAGE
OCWD ORGANIZATIONAL STRUCTURE
COST CENTER PROFILES:
GENERAL MANAGER
OFFICE OF THE GENERAL MANAGER ........................................................................... 3-1
PUBLIC AFFAIRS ........................................................................................................ 3-5
ENGINEERING & LOCAL RESOURCES
BOARD ADMINISTRATION .......................................................................................... 3-10
LOCAL RESOURCES .................................................................................................. 3-13
HUMAN RESOURCES ................................................................................................ 3-17
SAFETY & RISK MANAGEMENT ................................................................................. 3-20
ENGINEERING ......................................................................................................... 3-23
INFORMATION SERVICES ........................................................................................... 3-27
PROPERTY MANAGEMENT ........................................................................................ 3-32
PLANNING & NATURAL RESOURCES
PLANNING & WATERSHED MANAGEMENT .................................................................. 3-35
NATURAL RESOURCES ............................................................................................. 3-40
FINANCE
FINANCE ................................................................................................................. 3-45 PURCHASING .......................................................................................................... 3-50
WATER QUALITY
WATER QUALITY ..................................................................................................... 3-53
PHILIP L. ANTHONY WATER QUALITY LABORATORY ...................................................... 3-65
RESEARCH & DEVELOPMENT .................................................................................... 3-73
HYDROGEOLOGY ..................................................................................................... 3-87
REGULATORY AFFAIRS ............................................................................................ 3-92
OPERATIONS
WETLANDS OPERATIONS ......................................................................................... 3-98
WATER PRODUCTION ............................................................................................. 3-101
RECHARGE OPERATIONS ....................................................................................... 3-107
SECTION 3 TABLE OF CONTENTS
Orange County Water District FY 2020-21 Budget Report
This page intentionally left blank
Boa
rd o
f D
ire
cto
rs
Ope
nP
ublic
Aff
airs
Mik
e M
ark
us
Gen
era
l Ma
nag
er
Bru
ce D
osi
er
IS/P
rop
ert
y M
an
age
me
nt
Ran
dy
Fic
kT
rea
sure
r/C
FO
Ste
ph
anie
. Do
sie
rH
uman
Re
sour
ces/
Ris
k &
Saf
ety
Jan
ice
Dur
an
tD
istr
ict
Se
cret
ary
Me
lissa
Och
oaA
cco
untin
g
Vis
ha
v S
harm
aF
ina
nce
Bon
nie
How
ard
Pur
cha
sing
Lee
Yoo
Lab
ora
tory
Pat
rick
Ver
slui
sW
ate
r Q
ualit
y
Me
ga
n P
lum
lee
Res
ear
ch &
D
eve
lop
me
nt
Roy
He
rnd
on
Hyd
rog
eo
log
y
Chr
is O
lse
nE
ngin
eeri
ng
Dic
k Z
em
ba
lN
atu
ral R
eso
urce
s
Joh
n B
on
san
gue
Rec
har
ge
O
pera
tion
s
Me
hu
l Pa
tel
GW
RS
/Wa
ter
Pro
du
ctio
n
Gen
era
l Co
un
sel
R
egu
lato
ry A
ffair
s
Joh
n B
on
san
gue
We
tlan
d O
pe
ratio
ns
Joh
n K
en
ned
yE
xecu
tive
Dire
ctor
E
ngin
eeri
ng &
W
ate
r R
eso
urc
es
Me
hu
l Pa
tel
Exe
cutiv
e D
irect
or
Ope
ratio
ns
OC
WD
Org
aniz
atio
nal
Str
uct
ure
Gre
g W
ood
side
Exe
cutiv
e D
irect
or
Pla
nn
ing
an
d
Nat
ura
l Re
sour
ces
L
oca
l Re
sou
rce
s
Pla
nn
ing
Jaso
n D
ada
kis
Exe
cutiv
e D
irect
or
Wa
ter
Qua
lity
&
Tec
hni
cal R
eso
urc
es
OFFICE OF THE GENERAL MANAGER
Orange County Water District FY 2020-21 Work Plan
OFFICE OF THE GENERAL MANAGER
Summary Information
Existing Staff – 2 FTEs
1 – General Manager
1 – Executive Assistant
Mission
Implement the policies of the Board of Directors.
Key issues for FY 2020-21
Implement PFAS policy by completing the design and beginning construction of treatment systems for affected Groundwater Producers.
Continue work on the Prado Basin CA feasibility study to increase water conservation at Prado Dam to elevation 505 year-round.
Continue to provide analysis for the proposed Huntington Beach Desalination Project.
Continue to monitor the construction of the Groundwater Replenishment System Final Expansion.
Continued implementation of the clean-up strategies for the North & South Basin Groundwater Protection projects.
Continue to advocate for funding at the State and Federal level for Forecast Informed Reservoir Operations (FIRO), supporting a pilot study for Prado Dam.
Secure funding for capital projects through State or Federal programs.
3-1
OFFICE OF THE GENERAL MANAGER
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 787,228 763,106 502,205Services and Supplies 1,650,897 1,55,720 1,555,475
Total $2,438,125 $2,318,826 $2,057,680
I FY 2020-21 Major New Initiatives/Programs
With Board approval, commence strategic planning workshops with Directors and staff on major initiatives for the next five years.
II Core Activities
The General Manager’s Office is charged with directing the activities of 221.5 full-time employees in their efforts to manage and protect the Orange County groundwater basin, which supplies the majority of the water used by 2.5 million people living in northern Orange County.
Core activities include:
Implementing and communicating the policies of the Board of Directors.
Supporting and preparing for Board and Committee meetings.
Managing organizational issues.
Managing outside legal services.
Coordinating legislative activities.
Providing external communications.
Coordinating with the Groundwater Producers.
Participation in WateReuse CA and the WateReuse Association to help support District initiatives and policy development for potable reuse.
Attending the Santa Ana Water Project Authority (SAWPA) meetings and engaging the member agencies general managers in upper Santa Ana watershed activities.
Coordination with the Municipal Water District of Orange County (MWDOC) on Metropolitan Water District of Southern California (MWD) issues.
III Non-Core Activities
Numerous requests for presentations and tours of District facilities.
3-2
OFFICE OF THE GENERAL MANAGER
Orange County Water District FY 2020-21 Work Plan
IV Group Goals for FY 2020-21
Lawsuits – Actively manage and pursue legal actions and settlements regarding:
Potential PFAS litigation
North Basin Groundwater Protection Project
South Basin Groundwater Protection Project
Irvine Ranch Water District litigation
Legislation - Advocate for the District’s legislative interests at the federal, state, and local levels. Actively monitor and aggressively support/oppose legislation impacting the District’s operations as necessary.
Federal: Work with the Army Corps of Engineers (ACOE) to pursue additional water conservation, develop a sediment removal project behind Prado Dam, and study Forecast Informed Reservoir Operations (FIRO) is a tool for water conservation. Work with the Environmental Protection Agency to secure additional State Revolving Funds for California and support a National Priorities List (NPL) listing for the North Basin Groundwater Protection Project. Continue working with federal legislators to secure funding for District projects and visit legislators and legislators’ staff in Washington, D.C.
State: Work with Association of California Water Agencies (ACWA), SAWPA, California Special Districts Association (CSDA), WateReuse CA, and others to monitor potential legislation concerning water quality, prevent shifting property tax revenue, and oppose legislating local issues; support good governance measures; monitor and apply for infrastructure/resources bond funding opportunities; monitor and take positions on legislation of importance to the District, and visit legislators and legislators’ staff in Sacramento.
Local: Work with local agencies, organizations, (including the Orange County Business Council [OCBC] Orange County Association of California Cities [ACC-OC] and Orange County Council of Government [OCCOG]), elected officials and their staff members to protect the District’s interests and operations. Meet with county supervisors and local city councilmembers.
GWRS Operation – Achieve production of 97,000 acre-feet.
Organizational – Work to improve the recruitment and retention of employees.
Metropolitan Water District of Southern California (MWD) – Actively participate in development of new policies dealing with groundwater issues which should include a change in the Water Supply Allocation Plan to allow groundwater purchases to be included, determine terms for early termination of the Conjunctive Use Program and change in policy to allow pumping of non-MWD potable supplies to be pumped into MWD pipelines. Also, provide technical assistance to MWD for its Carson Recycled Water Project.
3-3
OFFICE OF THE GENERAL MANAGER
Orange County Water District FY 2020-21 Work Plan
Grant Funding – Actively pursue any source of grant funding for selected projects.
V Pending Activities
Active participation in WateReuse CA, WateReuse Association, The Water Research Foundation, and ACWA.
Actively pursue operational efficiencies and explore additional opportunities for supply to the groundwater basin.
Continue to develop relationships with both SAWPA and non-SAWPA upper Santa Ana River watershed agencies.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-4
Public Affairs
Orange County Water District FY 2020-21 Work Plan
PUBLIC AFFAIRS
Summary Information
Existing Staff –8 FTEs
1 – Director of Public Affairs
1 – Legislative Affairs Liaison
1 Principal Communications Specialist
2 – Senior Communications Specialist
1 – Communications Coordinator
1 Senior Administrative Support Specialist
1 Multi-Media Graphics Designer
Mission
To demonstrate OCWD’s value to community stakeholders; to inform stakeholders about District projects and highlight programs, projects, and achievements that demonstrate the District’s commitments to water quality, water supply and reliability, sound financial management, industry leadership and innovation, sound planning, transparency and environmental stewardship; provide communications support for OCWD Board, general manager and staff; and, forge and maintain relationships and partnerships with producers (water retailers), elected officials, related professional membership associations, key community organizations, media, and other stakeholders.
3-5
Public Affairs
Orange County Water District FY 2020-21 Work Plan
Key Issues for FY 2020-21
PFAS Co-sponsor legislation with CMUA EPA Superfund Implementing the board-adopted legislative strategy. Solicit funding for District projects. Forecast Informed Reservoir Operations (FIRO). Prado Basin Feasibility Study. Next Generation Water Leaders Program. Social media campaigns and virtual tours. Crisis communications. Exploration of desalination. Implement new watershed education and field trip programs for disadvantaged
community elementary students. Rebrand of Children’s Water Education Festival. Speakers Bureau – local organizations and homeowners associations. Collaborations with producers, elected officials, and local organizations. Distinguishing OCWD’s role in OC and Southern California’s water industry.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 1,084,786 1,177,613 1,240,851Services and Supplies 805,558 884,950 875,950
Total 1,890,344 $2,062,563 $2,116,801
I FY 2020-21 MAJOR NEW INITIATIVES/PROGRAMS
Create PFAS communications materials
Co-sponsor legislation with CMUA
Work with legislators, legal counsel, and legislative consultants to secure and maintain support for District groundwater contamination clean-up projects and other District projects.
Educate newly elected officials about OCWD’s role and expertise in water and forge relationships with new members and their staff.
Implement new social media campaigns
Expand Next Generation Water Leaders Program.
Implement watershed education and field trip programs for disadvantaged community elementary students.
Provide support to OCWD Water Quality- lead OC PFOA/PFOA workgroup.
Create virtual tours of OCWD facilities.
Implement the Children’s Water Education Festival name change and rebrand.
3-6
Public Affairs
Orange County Water District FY 2020-21 Work Plan
Provide support as needed for ocean desalination exploration.
Provide support as needed for the GWRS Final Expansion.
Create a new crisis communications plan integrating social media.
Create a new Hydrospectives newsletter template to increase clicks and shares of OCWD stories.
II CORE ACTIVITIES
Continue to build awareness and support for OCWD’s programs and projects by communicating with key elected officials, community leaders, stakeholders, businesses, environmental groups, etc.
Manage editorial calendars for websites, social media, and publications to keep the information timely.
Work with state and federal elected regarding groundwater contamination remediation and other priorities.
Continue to advocate for Prado Basin Feasibility Study and FIRO.
Implement the board adopted legislative platform.
Continue to increase social media presence by creating strategic partnerships and recognizing OCWD’s staff, board, projects, and programs.
Continue proactive media relations program, including distributing press releases, contacting and meeting with new local reporters, coordinating media tours, and monitoring news media.
Distribute weekly Water Lines media feed and produce monthly Hydrospectives newsletter.
Continue to survey 25-35% of tour guests; surveys are part of water reuse global research projects.
Continue construction outreach – provide support to all departments doing new and/or regular maintenance projects.
Apply for grants for Children's Water Education Festival, H2O Learning Center, Water Hero, and Tour Program.
Continue to assist other departments in applying for grants involving construction, studies, water capture, water quality, etc.
Video production and graphics for corporate digital and print collateral.
Continue to organize the District photo, video, and graphics library with high definition images.
Work with WateReuse Research Foundation and Association to advance Direct Potable Reuse.
14th Annual Water Summit.
Continue to produce monthly press releases and guest columns.
Award submittals.
Review monthly committee write-ups for communications opportunities.
3-7
Public Affairs
Orange County Water District FY 2020-21 Work Plan
Plan monthly WACO meetings.
Continue to participate in and lead various water associations’ working groups/committees (ACWA, WRA, CSDA, ISDOC, SAWPA, CMUA, etc.).
Maintain and update hallway interactive displays and videos as needed.
Conduct annual Groundwater Adventure Tour of OCWD facilities for groundwater producers, general managers, elected, and community members.
Work with city councils, city managers, and water boards to be more informed and supportive of OCWD’s commitments, goals and objectives.
Assist OCWD Board members in their communication efforts with their stakeholders.
Improve communications for and between OCWD Public Affairs Department and producers’ public information representatives to generate a positive, mutually beneficial relationship and increase the clarity of wholesaler/retailer messages.
Be responsive to the needs of community neighbors impacted by OCWD construction, operations, or projects, so that they understand the need for the work and so that impacts are mitigated as much as possible.
Ensure OCWD’s innovations are noted in trade publications by developing relationships with key trade press.
Keep elected officials and their staff members up-to-date and supportive of OCWD issues and needs.
Build recognition, trust, and awareness of OCWD in leading community organizations.
Continue to support the communication efforts of other OCWD departments, including water quality and emerging contaminants outreach, legislative support, and water rights.
Inform stakeholders about District projects and highlight programs, projects, and achievements that demonstrate the District's commitments to water quality, water supply and reliability, sound financial management, industry leadership and innovation, and environmental stewardship.
Provide communications support to OCWD Board, general manager, and staff.
Communicate effectively, both internally and externally, about OCWD and its mission.
Forge and maintain relationships and partnerships with Producers, elected officials, related professional membership associations, businesses, key community organizations, environmental groups, media, and other stakeholders.
Additional functions and key tasks include crisis management, marketing, media relations, community relations, reputation management, outreach, and education.
3-8
Public Affairs
Orange County Water District FY 2020-21 Work Plan
Other related activities.
III NON-CORE ACTIVITIES
Support of outside water industry agencies (American Water Works Association Research Foundation [AWWARF], WateReuse, the Clean Water Alliance, Water Environment Research Foundation, ACWA, CMUA, National Water Research Institute [NWRI], etc.) for research support, conference support, etc.
IV GROUP GOALS FOR FY 2020-21
Implement new watershed education and field trip programs for disadvantaged community elementary students.
Make enhancements to the tour program (onsite and virtual). Increase local speakers bureau activities. Communicate regularly with producers – lead PFOA/PFOS workgroup efforts. Proactive legislative advocacy. Implement new engaging social media campaigns.
V PENDING ACTIVITIES
None
VI STAFF ADDITION NEEDED FOR FY 2020-21
None
VII FUTURE ISSUES
None
3-9
BOARD ADMINISTRATION
Orange County Water District FY 2020-21 Work Plan
BOARD ADMINISTRATION
Summary Information
Existing Staff - 6 FTE
1 District Secretary
1 – Assistant District Secretary
1 Records Coordinator
3 – Administrative Support Technicians
Mission
Maintain and manage official District documents and records, compile and prepare Board and Committee agendas and minutes. Perform other statutory duties as set forth in the District Act, including Conflict of Interest filings and publication of required legal notices.
3-10
BOARD ADMINISTRATION
Orange County Water District FY 2020-21 Work Plan
Key Issues for FY 2020-21
Implement updated Records Retention policies
Review and replace outdated records policies
Work with Information Services to plan and implement a District-wide electronic records management system
I FY 2020-21 Major New Initiatives/Programs
Implement updated records retention policies
Work with the IS Department to plan and implement the District-wide Records Management / Document Imaging system.
Review and update obsolete records policies
II Core Activities
The primary function of the Board Administration Department is to maintain all official District documents and records, to compile and prepare Board and Committee agendas and minutes to ensure compliance with all applicable state and federal laws, and to perform other statutory duties as set forth in the District Act, including Conflict of Interest filings and publication of required legal notices.
Another prime function is Records Management, which includes recording, filing, indexing, and maintaining a database of Board records for District-wide use.
III Non-Core Activities
Non-core activities (secondary priority compared to core activities) conducted by Board Administration include:
Director’s support – travel, expense reporting, meeting scheduling, and mail processing.
Management support – assist with research and preparation of submittals for Board consideration.
Maintenance of Board Policy Manuals and District Act.
IV Group Goals for FY 2020-21
Updating of Records Retention Policy: Engage the services of a records consultant to develop a work plan for District-wide implementation of
Account Information FY 2018-19 Actual
FY 2019-20 Budget
FY 2020-21 Proposed Budget
Salaries and Benefits 914,945 1,276,072 1,292,968Services and Supplies 336,337 336,340 338,040
Total $1,251,282 $1,612,412 $1,631,008
3-11
BOARD ADMINISTRATION
Orange County Water District FY 2020-21 Work Plan
departmental central filing utilizing new electronic records management system, and develop procedures for key staff related to scanning, accessing, and transmitting electronic records.
Scanning and indexing Board/Committee Agenda packets: Continue scanning Board/Committee Agenda packets as well as other District files into the electronic records management system (RMS).
Expanding and integrating the RCO database: The Department will continue to link the Board agenda packets and minutes databases to the legal documents database.
Training of District personnel on the use of Records Management System: The Department will continue to train District staff in ways to access records through the RMS.
V Staff Addition Needed for FY 2020-21
None
VI Future Issues
Scanning documents in the OCWD Library
Archival of District historical records
Inventory boxes held in storage at Iron Mountain
3-12
LOCAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
LOCAL RESOURCES
Summary Information
Existing Staff – 1 FTEs
1 – Executive Director of Engineering and Water Resources
Mission
Coordinate and manage basin management programs with Groundwater Producers. Assist with managing the financial and water budgets of the District. Coordinate water purchases from other agencies. Recommend the annual Replenishment Assessment, Basin Production Percentage, Production Limitation and the Basin Equity Assessment. Monitor and represent the District at MWD and MWDOC meetings. Coordinate MWD storage programs. Assist with the annual budget preparation. Manage grant/loan activities with appropriate funding agencies (Department of Water Resources, State Water Resources Control Board, MWD through MWDOC and others). Assist with issues related to projects creating new water supplies.
Key Issues for FY 2020-21
Provide analysis on key issues related to the Poseidon Resources Huntington Beach ocean desalination project.
Determine the optimum plan for distributing Poseidon water.
Complete the PFAS Planning Study
Process agreements with Groundwater Producers participating in the District’s PFAS program.
Determine how new potential state regulations will impact future water demands for OCWD.
Assist with developing a plan to prevent seawater intrusion in the Sunset Gap.
Consider a pilot storage deal with Moulton Niguel Water District.
3-13
LOCAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 293,747 279,974 280,360Services and Supplies 7,415 53,250 53,250
Total $301,162 $333,224 $333,610
I FY 2020-21 Major New Initiatives/Programs
Hire consultant(s) to begin designing PFAS treatment systems for the impacted Groundwater Producer.
II Core Activities
The Local Resources Department is primarily responsible for managing various local and imported water programs. The core activities of the group are:
Interacting, representing, and processing agreements with outside agencies such as the MWD, MWDOC, the local groundwater producers (i.e., water retailers), State of California (State Water Resources Control Board and Department of Water Resources) and others.
Administering any funding programs for current and future phases of the GWR System.
Administering and/or developing special programs such as basin management programs with groundwater producers.
Attend MWD Committee meetings and represent the District.
Administer the Coastal Pumping Transfer Program.
Monitor MWD available water supplies for purchase and water rates.
Annually establish the Replenishment Assessment, Basin Production Percentage, and Basin Equity Assessment collections.
Meet with Groundwater Producers as necessary to update District activities.
Evaluating new water supply projects.
Processing annexation requests.
Help process and administer Basin Equity Assessment exemption projects.
Preparing and administering the water purchase budget and in-lieu water purchase program.
Administer monthly groundwater producers’ meetings.
Recommend the annual RA and BPP to the Board
Providing long-term RA, BPP, and capital project projections.
3-14
LOCAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Prepare invoices, pertinent billing documents, and reports for the GWR System in compliance with the Local Resources Program's financial incentive contribution by MWD.
Manage the MWD Conjunctive Use Storage and Cyclic Storage programs with MWD and MWDOC.
Act as liaison with MWDOC.
Provide presentations to various groups, cities, and water districts within OCWD.
Assist with the production of monthly in-lieu invoices and annual Basin Equity Assessment reports.
Administer MWDOC/OCWD Joint Planning Committee meetings.
Manage and oversee the preparation of Board and Committee agendas and packets.
III Non-Core Activities
None
IV Group Goals for FY 2020-21
Complete the PFAS planning study.
Assist legal counsel with the IRWD lawsuit to resolve the remaining portions of this conflict.
Aggressively pursue grant opportunities for all capital projects, especially funding opportunities through Proposition 1.
Closely monitor the progress of the MWD Carson Indirect Potable Reuse project and ultimately determine the District’s participation if the project moves forward.
Continue maintaining close working relations with the Groundwater Producers to prevent issues and problems from developing.
Work with WRD to get the two staffs to agree on the amount of water being lost to the LA groundwater basin.
Begin administering the SARCCUP program.
Determine how the new state law regarding Producer water demands will impact expected future 2040 water demands.
Prepare all documents and resolutions necessary to set the FY20-21 RA, BPP, BEA and Production Limitations
Assist the Board in determining the best option for distributing water from the Poseidon Resources ocean desalination project.
Review options and issues with potential MNWD pilot storage program.
3-15
LOCAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Develop a remediation plan for the Sunset GAP seawater intrusion issue.
Potentially begin the Poseidon EIR supporting the District’s distribution plan.
V Pending Activities
Major activities that are not being implemented include water conservation activities and financial incentive programs to further enhance water conservation efforts within the District’s service area.
Developing projects and programs to reduce groundwater basin salinity levels.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-16
HUMAN RESOURCES
Orange County Water District FY 2020-21 Work Plan
HUMAN RESOURCES
Summary Information
Existing Staff - 5 FTEs
1 ─ Director of Human Resources
2 – Senior Human Resources Specialist
1 – Human Resources Specialist
1 – Administrative Support Technician/Receptionist
Mission
Manage the District’s Human Resources program to integrate the human value with water management objectives.
Key Issues for FY 2020-21
Revamp the on-boarding process
Update Personnel Manual
Continue required training programs for managers and supervisors. This effort will be ongoing.
Performance evaluation process.
Successional Planning.
3-17
HUMAN RESOURCES
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 932,626 734,152 745,980Services and Supplies 141,039 235,150 235,350
Total $1,073,665 $969,302 $981,330
I FY 2020-21 Major New Initiatives/Programs
Revamp the onboarding process
Retention of Documents
Review of Performance Evaluation Process and online systems.
Succession Planning.
II Core Activities
The Human Resources Department is primarily responsible for the District programs that integrate the human value with water management objectives.
Core activities include:
Negotiations with OCEA.
District recruitment efforts - This includes placements, resume reviews, interviews, background investigation, and coordinating pre-employment physicals and drug testing.
Safety and Risk Management oversight.
HRIS and Timekeeping System administration and implementation – ongoing.
Implement new programs to meet new mandates.
Policy development and management - Staff, must monitor federal and state employment-related laws and regulations to ensure the business practices and policies stay current, and the District is fully compliant.
Benefits Administration - Work with brokers to ensure competitive health insurance programs. Act as liaison on all benefit issues between employees and the carriers.
Retirement program administration.
Compensation Administration - This includes market surveys and compensation policy development and administration.
Mandated Programs - This includes programs mandated by federal and state guidelines. Unemployment insurance benefits program, Department of Transportation drug and alcohol program, training programs, among others.
Employee Relations - This includes employee discipline, employee documentation, employee counseling, and representing the District at employment related hearings.
3-18
HUMAN RESOURCES
Orange County Water District FY 2020-21 Work Plan
General Personnel Administration - This includes keeping all required documentation on all employees, filing appropriate federal and state reports. Also, participation in surveys and special reports as requested by managers.
Employee morale programs such as Employee of the Quarter and Year Program, and Employee Recognition Program.
III Non-Core Activities
None
IV Group Goals for FY 2020-21
Update Personnel Manual
Revamp On-Boarding Process
Continue to expand on the training program for managers and supervisors.
Complete audit of all forms and department procedures.
V Pending Activities
Modify the department filing system, including the Employee Personnel files.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-19
SAFETY AND RISK MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
SAFETY AND RISK MANAGEMENT
Summary Information
Existing Staff - 2 FTEs
1 – Risk & Safety Manager
1 – Health & Safety Specialist
Mission
It is the mission of the Risk & Safety Department to support all functions of the Orange County Water District to help ensure a safe and healthful workplace. This is achieved by maintaining a safe & healthy working condition by fostering a culture focused on awareness, open communication, safety education, and management support.
A partnership with management and staff who are aware of risks and are empowered to learn, contribute and work in a manner that protects human health and the environment.
Key Issues for FY 2020-21
Security upgrades
Emergency Preparedness
New Regulations
Construction, Final Expansion
Environmental Audit
Executive Updates
3-20
SAFETY AND RISK MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 363,833 377,931 393,064Services and Supplies 924,994 1,200,350 1,166,200
Total $1,288,827 $1,578,281 $1,559,264
I FY 2020-21 Major New Initiatives/Programs
Video Surveillance System
Active Shooter Training/Drill
Wildland Smoke plan and training
Vehicle Safety Program
Final Expansion construction project
Business Continuity Plan
Environmental audit
New Risk & Safety Website
Monthly updates to Mike Markus
II Core Activities
Provide Health & Safety training for New Hires.
Provide ongoing and refresher safety training.
Provide Confined Space Rescue Drills.
Provide Fall Rescue Drills.
Complete and submit OSHA 300A online
Complete and post OSHA 300A log.
Submit the annual NIMS Data Collection Report.
Conduct Inspections and audits.
Organize and conduct Safety Review Team meetings.
Organize and conduct Emergency Response Team (ERT) training & drills.
Respond to on-going Environmental, Health, Safety & Security issues.
Schedule, organize, and conduct annual fire drills.
Complete and submit Business Plans for all three locations.
Complete and submit EPA ID reports for all three EPA ID numbers.
Conduct office ergonomic assessments. Provide equipment and recommendations to reduce ergonomic related risks.
Manage the Safety Shoe Program.
Review contractors’ safety forms and follow up as needed.
Schedule and conduct annual respiratory medical questionnaire, fit testing, and training.
3-21
SAFETY AND RISK MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
Manage Workers’ Compensation program.
Evaluate and procure needed safety supplies/equipment.
Oversee security companies at Fountain Valley and Field Headquarters.
Update the Risk & Safety website.
Conduct monthly security alarm testing.
Participate in WEROC
III Non-Core Activities
Non-core activities, continuing education, and networking:
Participate in PASMA (Public Agency Safety Management Association) meetings and conferences.
Participate in ASSP (American Society of Safety Professionals) meetings and conferences.
Participate in WUSMA (Water Utilities Safety Managers’ Association).
IV Group Goals for FY 2020-21
Conduct Inspections & Audits.
Review & update safety programs.
Follow up on work-related incidents.
Comply with regulatory updates.
Provide training & communication to staff.
Manage security program.
V Pending Activities
Video Surveillance System
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-22
ENGINEERING
Orange County Water District FY 2020-21 Work Plan
ENGINEERING
Summary Information
Existing Staff - 8 FTE 1 – Director of Engineering 2 – Principal Engineer 1 – GWRS Program Manager 1 – Senior Engineer 1 – Engineer 1 – Associate Engineer 1 – Senior Administrative Support Specialist
Mission Plan, design, and manage the construction of the District’s improvement projects.
Key issues for FY 2020-21 GWRS Final Expansion –The Final Expansion includes the Advanced Water
Treatment Facility (AWTF) Expansion and construction at OCSD’s Plant 2, which includes an effluent pump station, two flow equalization tanks, and headworks modification. The project also includes secondary effluent pipeline rehabilitation between OCSD Plant 2 and GWRS. Construction of the Final Expansion of AWTF, Plant 2 pump station, Plant 2 flow equalization
3-23
ENGINEERING
Orange County Water District FY 2020-21 Work Plan
tanks and the Headworks Modification began in the Winter of 2019. The pipeline rehabilitation portion of the project will be advertised for construction bids in the summer of 2020. Construction of all components will take place over three years.
Talbert Barrier Pipeline Improvements – The project includes replacing three segments of undersized and antiquated pipe. The first location is at the intersection of Ellis Avenue and Ward Street. This location requires the replacement and/or upgrade of approximately 800 feet of 30-inch diameter concrete cylinder pipe and injection well I-5 lateral piping. The second location is a 24-inch diameter asbestos cement (ACP) pipeline segment crossing beneath the Talbert Channel). The third location is replacing 1,700 lineal feet of pipe between injection wells 2 and 5. Design is complete and the project will be advertised in the Summer of 2021 to avoid traffic conflicts on Ellis Avenue during the 405 Improvement Project.
Account Information FY 2018-19 Actual
FY 2019-20 Budget
FY 2020-21 Proposed Budget
Salaries and Benefits 1,199,755 1,011,784 863,389 Services and Supplies 64,076 85,200 44,700
Total $1,263,831 $1,096,984 $908,089
I FY 2020-21 Major New Initiatives/Programs PFAS Treatment Systems Program – This program will provide financial
assistance to the Groundwater Producers to comply with new per- and polyfluoroalkyl substances (PFAS) regulations. The program calls for the District to take the lead in funding, design, and constructing the necessary PFAS treatment systems which may include granular activated carbon or ion exchange treatment for ten Groundwater Producers who are potentially impacted by the new regulations. These treatment systems would be owned and operated by the individual Groundwater Producers. The program will be staggered over the next few years and several Producer treatment systems will be in design and construction in FY 20/21.
II Core Activities The Engineering Department is responsible for planning, design, and construction management of the District’s improvement projects. Projects range from small in-house modifications for existing facilities to major water treatment, pumping and conveyance facilities including the GWR System. Engineering staff may perform the planning, design and construction management or may manage outside consultants performing these functions. Departmental staff provides engineering support as needed for the daily operations of the District, including Water Production, Forebay Recharge, Prado Operations, Seawater Barrier
3-24
ENGINEERING
Orange County Water District FY 2020-21 Work Plan
Operations and Property Management. Engineering staff also review proposed projects of other agencies that may impact District operations or lands. Core activities include:
Implementing the Capital Improvement Program.
Implementing the repair and replacement of District infrastructure.
Planning new projects to increase the yield of the basin and protect water quality.
Supporting operations of Forebay, Prado Wetlands, Green Acres Plant, GWRS, and Seawater Intrusion Barriers.
Data analysis of operations. Permit compliance support. Operational improvement input. Facility improvement construction. Utility conflict analysis and research.
Preparation of Annual Engineer’s Report.
Manage the District’s as-built drawings. Support for the Recharge Enhancement Working Group (REWG).
III Non-Core Activities Non-core activities (secondary priority compared to core activities) conducted by the Engineering group include:
Monitoring outside water reuse project operational activities.
Monitoring regulations and legislative affairs activities of the WateReuse Organization.
Publishing operational data in journals and conference proceedings.
Participation in technical review committees.
IV Group Goals for FY 2020-21 Smith Basin Reconfiguration – Smith Basin is located on the Santiago Creek,
immediately upstream of the Santiago Basins. High flows in Santiago Creek have caused erosion along the walls of Smith Basin that could impact adjacent properties with continued high flows in Santiago Creek. Design of the improvements necessary to re-route the channel to original conditions and slope repairs to protect adjacent roads and properties have been completed, and construction contract documents will be advertised in Spring 2020. Construction will take place in FY 20/21.
3-25
ENGINEERING
Orange County Water District FY 2020-21 Work Plan
V Pending Activities None
VI Staff Addition Needed for FY 2020-21 None
VII Future Issues Implementation of Recharge Enhancement Working Group Projects.
3-26
INFORMATION SERVICES
Orange County Water District FY 2020-21 Work Plan
Information Services
SUMMARY INFORMATION
Existing Staff - 10 FTEs
1 Director of Information Services
1 – Principal Programmer Analyst
4 Senior Programmer/Analysts
1 – Principal Network Administrator
2 Senior Network Administrators
1 Information Services Specialist
Mission
Manage and support information systems, services, and communications assets used by District staff and third parties in support of basin management goals and objectives.
Key Issues for FY 2020-21
Modernization of Laboratory Information System (LIMS).
Implementation of Video Monitoring System (VMS).
3-27
INFORMATION SERVICES
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
Actual FY 2019-2020
Budget FY 2020-21 Proposed
BudgetSalaries and Benefits 1,725,546 1,739,709 1,755,730Services and Supplies 890,863 966,100 979,000
Total $2,616,410 $2,705,809 $2,734,730
I FY 2020-21 Major New Initiatives/Programs
Development of a Systems Strategic Plan.
II Core Activities
Information Services (IS) is a staff support organization that manages and supports District information systems, services, and communication assets used by District staff and third-parties in support of basin management goals and objectives.
Core activities include:
Network support: Managing and supporting the various components of the enterprise-wide network infrastructure spanning the Fountain Valley, Anaheim, and Prado facilities and composed of Ethernet hubs, routers and switches, wi-fi access points, and the Ethernet and fiber-optic cabling and data communication services connecting them.
Server management: Managing and supporting physical, virtual, and cloud-based Microsoft Windows Servers based network computer systems that support databases, and core enterprise software applications, Intranet, Internet and other information services.
Cloud-based systems: Managing and supporting Microsoft cloud-based systems such as Office 365 used for email and other office support systems as well as Microsoft Azure used for various applications used by District staff in the field.
Core enterprise systems support: Managing, supporting and programming for the District’s core enterprise software applications such as the JDE Financial Information System used by Finance and other departments for tracking and reporting the financial and purchasing transactions of the District, the Water Resources Management System (WRMS) used for tracking, analyzing and mapping data collected from the District basin, the Computerized Maintenance Management System (Maximo) used by Water Production to manage the maintenance requirements of the AWPF and the Lab Information System (LIMS) used by the Laboratory to track water samples from the District basin and for complying with regulatory reporting.
Operations: Performing routine and non-routine systems operations including network and server system administration, managing user accounts, managing server disk space and load balancing, performing daily, weekly and
3-28
INFORMATION SERVICES
Orange County Water District FY 2020-21 Work Plan
monthly computer system backups and restores, and telephone system administration.
System maintenance: Performing system maintenance, repairs, and upgrades for network and servers, desktop and laptop computers as well as managing maintenance and license agreements for District hardware, software and information services.
Programming and Technical IS Projects: Managing, supporting, and programming for interdepartmental projects including special computer system projects for various departments. IS also provides analytical, programming, technical and training support to those who use District information systems.
Staff support: Providing support to District staff for network and server issues, core enterprise software applications, email system, Microsoft Office software, desktop and laptop computers, and a variety of other digital mobile equipment including iPads and iPhones.
Telecommunications: Managing and supporting voice and data communication services, including the Cisco Voice over Internet Protocol (VoIP) telephone and voicemail system, all communication equipment and lines connecting the District to various telephone system carriers, voice and data service contracts and District-issued cell phones and smartphones. IS also manages and supports the enterprise-wide data lines connecting the Anaheim and Prado facilities with the Fountain Valley campus, various SCADA locations throughout the basin and internet connectivity to District staff and third parties.
System security: Ongoing management of system security including administration of an appropriate level of firewall protection to prevent unauthorized intrusion to the District network from the Internet, the administration and monitoring of centralized, District-wide anti-malware software and services to prevent the spread of destructive and non-destructive computer viruses and “spam” email. As new forms of security threats emerge on the Internet, IS analyzes the risk and determines the appropriate steps and actions necessary to respond.
Audio/Visual: Managing and supporting the District’s sophisticated network controlled multi-component audio-visual equipment composed of LED screens, amplifiers, switchers, transmitters, receivers, and control devices.
Websites: Ongoing technical support for District-related websites, including resolving technical issues with websites, hosting services, Internet registration services, and reputation management services.
III Non-Core Activities
None.
3-29
INFORMATION SERVICES
Orange County Water District FY 2020-21 Work Plan
IV Group Goals for FY 2020-21
Modernization of LIMS System: Continued support and enhancements to current LIMS.
Improvements to WRMS: Upgrade WRMS and SDE (Spatial Database Engine) Oracle database from 12c to 19c; convert WRMS Oracle Forms to Windows/Web Forms. Work with GIS staff in upgrading ArcGIS Server, SDE, ArcGIS Portal, and GeoCortex to the latest version.
Records Management / Document Imaging system: continued support of the rollout of records management/document imaging system with Board Administration / Records Management departments
Upgrade District enterprise systems: Upgrade minor versions in major District systems such as JD Edwards and Maximo as appropriate.
Continued improvements to systems and email security: Audit Information Services system security and implement improvements; implementation of additional email protection services.
Continued network improvements: Continued network improvements, optimization, and resiliency, including improving communications at Prado field office and other locations where necessary in support of the VMS, adding backup Internet connection at Fountain Valley.
Continued disaster recovery improvements: Implement regular testing of Disaster Recovery Capabilities; Assess disaster recovery capabilities for the Forebay Operations Supervisory Control, and Data Acquisition (SCADA) system and the AWPF Delta V process control system.
Develop system and security policies: Develop written system and security policies.
Develop system documentation: Revise system operations procedures and documentation to address more current hardware and software in use by District.
Technical and security training: Continued focus on training and cross-training for Information Services staff. Continuously train staff on detecting security threats that may enter through email, and by other means.
Cloud-based systems: Explore using cloud-based Microsoft Azure SQL Database for various District database functions.
Obsolete systems replacement: Replacement of obsolete hardware and software, including Microsoft Windows 7 computers, which are no longer supported by Microsoft.
Office 365 and Sharepoint: Conversion of the District’s Intranet to SharePoint Online and leveraging SharePoint and other Office 365 capabilities for District staff.
3-30
INFORMATION SERVICES
Orange County Water District FY 2020-21 Work Plan
V Pending Activities
Major activities that are not being implemented include:
Performing analytics to determine usage of District websites.
Ongoing monitoring and configuring websites for Search Engine Optimization (SEO).
Information Services provides little to no support of the Forebay SCADA system and the AWPF Delta V process control system.
VI Staff Addition Needed for FY 2020-21
None.
VII Future Issues
In the next two to three years, issues the District will need to consider include:
Increased Internet security threats: Measures to provide security against emerging Internet threats continue to increase, resulting in dedicating additional hardware, software and staff resources to address the emerging security issues.
Increased disk storage, backup, and disaster recovery requirements: With new systems and technology, the IS staff will continue to be challenged with evaluating new methods and systems of data storage, backups and disaster recovery methods.
Audiovisual replacement: The audiovisual equipment was installed in the Boardroom and the Conference rooms in 2012 and will require reviewing for possible replacement.
Cloud-based services: enterprise systems are increasingly moving away from on-premise servers and toward cloud-based systems. As this develops, we will require reviewing in the future.
Staff Training: Staff training to implement and support newer systems and keeping up with fast-moving Information Systems trends.
3-31
PROPERTY MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
PROPERTY MANAGEMENT
Summary Information
Existing Staff - 1 FTE
1 – Property Manager
Mission
To manage the District’s real estate assets in a manner that provides revenue to the District and preserves or adds value to the assets while supporting basin management objectives.
Key issues for FY 2020-21
Three licenses with Southern California Edison (SCE) expire January 31, 2021 (2 for Green Acres Project – GAP; 1 for injection wells I27 & I28).
Increased requests from other agencies for the use of District land.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 88,755 116,908 121,087Services and Supplies 175,321 131,460 152,500
Total $264,076 $248,368 $273,587
I FY 2020-21 Major New Initiatives/Programs
Continued negotiations with Caltrans to decertify and acquire additional land at Burris Basin along Ball Road.
3-32
PROPERTY MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
II Core Activities
The Property Management Department is primarily responsible for managing over 3,700 acres of the District’s real estate assets, negotiating and managing licenses, leases, easements, and deeds for use of the District’s real estate assets by other parties including local and state agencies, protecting the District’s property rights, processing land use entitlements to add value to the assets, acquiring real estate, property rights and rights-of-ways for use as recharge basins, well-sites, pipelines or other uses in support of basin management goals and objectives.
Core activities include:
Property Management: includes administrative management of District real estate, including inspections, fire department vegetation control, and neighbor interaction.
Developing Property Use Agreements: includes negotiating and managing licenses, leases, easements, rights-of-ways, and exclusive negotiating agreements with other parties; monitoring collected rents and fees and agreement compliance auditing.
Maintaining Property Rights: coordination with staff, local, state and federal agencies and law enforcement to keep District land free of hazards and trespassers and by securing property with fencing, locks, and gates; posting “No Trespassing” signs and other signage as appropriate; verifying District property boundary lines to determine if trespassing or encroachment is occurring on District property. Monitoring Land Use and zoning modifications by municipalities and assessing impacts on District real estate.
Managing Real Estate Acquisitions and Sales: includes managing the acquisition or sale process for real estate or property rights; negotiating purchase agreements, real estate broker agreements and other related documents and agreement for new well sites and new construction projects; acquiring and evaluating appraisals and title reports; involves determining legal descriptions, property owners and rights to be acquired.
Managing Land Use Entitlements: includes managing the Land Use Entitlement process such as Zoning and General Plan changes with appropriate cities.
Coordinating the Property Management Committee: development of agendas for the monthly Property Management Committee meetings of the Board of Directors, including writing all staff reports.
III Non-Core Activities
Non-core activities (secondary priority compared to core activities) conducted by the Property Management group include:
Providing data and information to outside agencies and organizations.
3-33
PROPERTY MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
IV Group Goals for FY 2020-21
License Agreements with Southern California Edison (SCE): Negotiate two new licenses with SCE for Green Acres Pipeline (GAP) pipeline and one new license with SCE for injection wells I27 and I28; all three expire January 31, 2021.
Caltrans Decertification at Burris Basin: Negotiate the acquisition and/or long-term lease for Caltrans property at Burris Basin property.
Assistance on property issues for new wells and new construction sites: Assist Hydrogeology and Engineering groups with acquiring easements for wells and facilities for the North Basin Groundwater Protection Project, Mid-Basin Injection Project, and other projects with site access needs.
Prado Properties: Explore potential acquisition of leased property adjacent to District Prado properties in Riverside County.
Santa Ana River Trail: Coordinate activities with the County of Riverside, City of Corona, and other participating agencies in the development of the Santa Ana River Trail (SART) project as it relates to the District’s Prado properties.
V Pending Activities
Major activities that are reduced, not being implemented or conducted include:
Research and pursuit of creative lease opportunities to generate revenue for the District.
Proactive monitoring of zoning and sphere of influence issues on District property.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
In the next one to two years, issues the District may need to consider:
Consideration of other long-term opportunities to lease District land at higher lease rates.
3-34
PLANNING AND WATERSHED MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
PLANNING AND WATERSHED MANAGEMENT
Existing Staff - 4 FTEs
1 – Executive Director of Planning and Natural Resources
1 – Principal Planner
1 – Senior Watershed Planner
1 – Recharge Planning Manager
Mission
Conduct long-term planning of District’s facilities and programs, prepare planning documents and environmental analyses for new projects, secure permits from resources agencies, implement the District’s watershed management programs, document compliance with Sustainable Groundwater Management Act.
Key Issues for FY 2020-21
Working with the Army Corps to enhance water conservation at Prado Dam, including completing the Prado Basin Feasibility Study and assessment of Forecast Informed Reservoir Operations.
Working with other OC stakeholders to implement Integrated Regional Water Management (IRWM) in Orange County.
Implement the Santa Ana River Conservation and Conjunctive Use Project (SARCCUP), including developing 36,000 af water bank in the OC Basin and construction of five new production wells.
Watershed Management – Interface with watershed stakeholders. Participate in Upper Santa Ana Watershed Habitat Conservation Plan, Basin Monitoring Program Task Force, and Imported Water Recharge.
Managing the demonstration project to test pre-treatment of river water prior to recharge as a means to improve recharge basin performance.
3-35
PLANNING AND WATERSHED MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 803,308 866,600 854,855Services and Supplies 1,381,064 1,313,700 671,300
Total $2,184,372 $2,180,300 $1,526,155
I FY 2020-21 Major New Initiatives/Programs
None
II Core Activities
The Planning and Watershed Management Department are primarily responsible for the District’s long-term planning, interfacing with agencies above Prado Dam, watershed management, and preparation of environmental documents.
Core activities include:
Conducting long-range planning of future activities and facilities at the District.
Working with Army Corps of Engineers to increase stormwater capture at Prado Dam.
Planning new projects to increase the yield of the basin and protect water quality (shared with Engineering and Hydrogeology).
Protecting the quality of SAR flows.
Preparing environmental documents (e.g., Environmental Impacts Reports).
Securing environmental permits for District projects, such as the Army Corps Clean Water Act Section 404 permits, and California Department of Fish and Game 1600 permits.
Maintaining compliance with the Sustainable Groundwater Management Act (SGMA).
Evaluating new methods to improve the performance of the District’s surface recharge facilities in Anaheim and Orange.
Interacting, representing, and processing agreements with outside upstream agencies such as SAWPA, upstream agencies, regulatory agencies, etc.
Interface with watershed stakeholders. Lead Integrated Regional Water Management activities participate in Upper SA Watershed Habitat Conservation Plan development. Participate in SAWPA task forces on basinwide water quality. Monitor implementation of stormwater NPDES (“MS4”) permits in Orange, Riverside, and San Bernardino Counties. Monitor cleanup of the Stringfellow hazardous waste plume in Riverside County and other contamination sites in the upper watershed that may pose a threat to the Santa Ana River.
3-36
PLANNING AND WATERSHED MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
Interfacing with the regulatory agencies and upstream water agencies on issues affecting the Santa Ana River.
Maintaining permits from resource agencies for the District’s operations and maintenance activities at Prado Wetlands and recharge facilities in Anaheim and Orange.
Managing the District’s water rights on the Santa Ana River and Santiago Creek.
Reviewing environmental documents prepared by agencies in the watershed with respect to potential impacts on the District’s operations and the watershed.
III Non-Core Activities
None
IV Group Goals for FY 2020-21
Prado Basin Feasibility Study – This is a joint activity with the Army Corps to prepare a Feasibility Study to evaluate ecosystem restoration and increase the storage level at Prado Dam so that additional water can be stored and subsequently recharged in the District’s facilities. The Feasibility Study includes evaluation of permanently increasing the winter-time water conservation from elevation 498 feet to 505 feet. The Study is scheduled for the Chief of Engineer’s Report by the Corps in August 2020.
Integrated Regional Water Management (IRWM) – The Board adopted a new IRWM Plan for North and Central OC and approved a cost-share formula with SAWPA for grant funding available for IRWM projects. Staff is working with the County of Orange, OCSD, and other stakeholders on this effort.
Forecast Informed Reservoir Operations (FIRO) Scoping Study - Stormwater captured at Prado Dam is a key source of water used to recharge the groundwater basin. Enhanced weather forecasting has the potential to increase the efficiency of stormwater capture and reduce potential losses to the ocean. Work in FY 2020-21 will focus on preparing the Preliminary Viability Assessment of FIRO at Prado Dam with Scripps, the Army Corps, and other partners.
Quagga Mussel Control Study
The presence of the quagga mussel in imported water from the Colorado River limits where this water can be recharged. To increase the District’s recharge system flexibility, OCWD and other partners are conducting a study with partial funding from the Metropolitan Water District of Southern California to assess the effectiveness of a copper-based product called EarthTec in eliminating the threat of quagga mussel infestations in recharge facilities. Testing will be conducted on water from Lake Matthews, OC-28 (at Anaheim Lake), CB-28 (where imported water is delivered to the Water Replenishment District in coastal LA County), and at Lake Piru in Ventura County (United Water Conservation District facility and a
3-37
PLANNING AND WATERSHED MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
funding partner). Also included is a toxicity study to assess the potential impacts this product could have on other non-target aquatic organisms.
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) – This program includes the development of a water bank to store water conveyed into the watershed from surplus supplies available from the San Bernardino Valley Municipal Water District (Valley District) and other supplies that may be conveyed through the State Water Project by Valley District. Additionally, SARCCUP includes funding to remove 640 acres of Arundo donax and funding that will be provided to five groundwater producers to assist them in constructing five new production wells. SARCCUP is partially funded through a Proposition 84 grant. Work in FY 2020-21 will focus on Arundo removal activities and planning the five new production wells.
SAR Water Rights - The District currently holds rights to divert and recharge 362,000 afy of Santa Ana River water. In its water rights decision that appropriated 362,000 afy of river water to the District, the State Water Resources Control Board determined that it would hold in abeyance an additional 143,000 afy associated with potential long-term projects that the District could construct. The State Board determined that it would hold the additional 143,000 afy in abeyance until 2023. However, the State Board has requested that the District provide annual reports on the District’s plans to utilize the 143,000 afy held in abeyance.
Recharge Facility Planning – The District focuses on maximizing the performance of our existing surface recharge basins in Anaheim and Orange. This effort includes managing the Riverbed Filtration Demonstration project, which pretreats river water prior to recharge in Olive Basin as a means to improve recharge performance. Performance testing will continue to collect water quality and recharge rate data over a range of hydrologic conditions. Staff is also evaluating options to increase the performance of various recharge facilities. This effort also includes managing the Recharge Enhancement Working Group (REWG), which is a meeting of staff from multiple District departments to brainstorm methods to enhance groundwater recharge. The District is also leading a study to test a new method for control of quagga mussels in imported water supplies. A portion of this study is funded by MWD and other partners.
Upper Santa Ana Habitat Conservation Plan (HCP) – The District has been participating in the preparation of the Upper Santa Ana HCP to protect habitat values in Prado Basin. In FY 2020-21, key portions of the HCP will be and finalized.
Santa Ana River Flow Estimates – Potential projects and activities in the upper SAR Watershed can affect the amount of SAR flow that reaches Orange County. Due to water supply changes in California and the southwest United States, agencies throughout the area are proposing new projects that could impact flows in the SAR. Staff will continue to monitor and review proposed projects in the upper watershed with respect to their impact on flow rates in the SAR. Staff will also work with agencies in the upper watershed to evaluate these issues.
3-38
PLANNING AND WATERSHED MANAGEMENT
Orange County Water District FY 2020-21 Work Plan
Environmental Analyses and Permitting – Environmental analyses are anticipated for new projects, including the GWRS turnout into Burris Basin, Talbert Barrier Pipeline Replacement, Sunset Gap seawater intrusion, and sand removal near River Road bridge near Norco (upstream of Prado Dam).
Watershed Management – Participate in task forces administered by SAWPA, including:
Basin Monitoring Program Task Force.
Salinity Management and Imported Water Recharge Workgroup.
Middle Santa Ana River Bacterial Indicators TMDL.
Participate in the development and implementation of watershed plans for North and Central Orange County. Monitor activities in the Chino Groundwater Basin and the implementation of ‘hydraulic control’ in the Chino Basin.
V Pending Activities
None
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-39
NATURAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
NATURAL RESOURCES
Summary Information
Existing Staff – 3.5 FTEs
1 ─ Director of Natural Resources
1 ─ Habitat Restoration Manager (Principal Environmental Specialist)
1 ─ Senior Environmental Specialist
0.5 – Environmental Specialist (* Cost Shared 50% with SAWA)
Mission
Manage natural resources in the Santa Ana River Watershed, focusing upon District property to maintain or improve water quality, water supply, habitat, and wildlife populations in fulfillment of OCWD mitigation responsibilities; help maintain Arundo-free a minimum of 5,000 acres of former Arundo on the Santa Ana River generating a minimum of 18,750 acre-feet of water annually; manage endangered Least Bell’s Vireos in fulfillment of Regulatory requirements for Water Conservation.
Key issues for FY 2020-21
Continue partnerships for additional Arundo control on the SAR while raising public awareness of the issues and benefits.
Assist in the preparation of permit applications and negotiate conditions cooperatively with other Departments and Regulators for various District
3-40
NATURAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
projects, including Sediment Management in Prado Basin, water conservation, the Corps Feasibility Study, and District operational activities including RGP implementation and monitoring.
Coordinate with Army Corps and resource agencies regarding Enhanced Water Conservation in Prado Basin, including deviation requests while environmental documentation and permits are pending.
Represent the District on the Santa Ana Watershed Association Board and various other task forces and planning groups such as the Santa Ana Sucker Conservation Team.
Oversee endangered bird monitoring and Natural Resources management efforts in the Prado Basin and other District properties; organize watershed-wide monitoring of select endangered populations, documenting the annual population status of the largest least Bell’s vireo population in existence.
Refine data gathering and reporting on OCWD maintenance activities in the recharge area of the river and at Prado under permits with the U.S. Army Corps of Engineers, and agreements with CA Department of Fish and Wildlife, and California Regional Water Quality Control Board.
Continue Sucker restoration on Sunnyslope Creek and other activities as per OCWD - CA Department of Fish and Wildlife Agreement.
Maintain, monitor, and report upon dozens of mitigation and other habitat restoration sites that were set aside to offset potential effects of District projects and activities.
Monitor and attempt control of Quagga Mussels and other potentially harmful invasive species.
Maintain permits for endangered species work
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 714,178 791,365 791,856 Services and Supplies 672,280 2,734,558 1,616,250
Total $1,386,458 $3,525,923 $2,408,106
I FY 2020-21 Major New Initiatives/Programs
Participate in the San Bernardino Valley MSHCP, resulting in permits for three District covered activities.
Collaborate with experts in monitoring and controlling shot hole borer beetle damage to riparian trees in Prado and throughout the watershed.
Organize fish population studies and enhanced monitoring and management of nesting seabirds in the Burris Basin toward greater reproductive success.
Facilitate transfer to OCWD of 2,000 acres of Corps lands leased to the County of Riverside in the Prado Basin.
3-41
NATURAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Adaptively create and manage habitat for threatened Santa Ana Suckers in the river above Prado.
II Core Activities
Managing wildlife habitat and populations as per mitigation requirements and regulatory permit compliance.
Implement and report Sucker conservation, restoration, and native fish establishment efforts.
Interacting with outside agencies such as the U.S. Fish and Wildlife Service (FWS), Army Corps of Engineers (ACOE), SAWPA, the local governmental agencies, etc., in representing OCWD interests in environmental planning.
Interacting with other departments and regulatory agencies to ensure the environmental compliance of District projects and activities.
Administering and overseeing natural resources management efforts, removal of Arundo, and other invasives from the SAR Watershed.
Seeking outside funding and administering expenditure of those funds.
Interfacing with non-governmental organizations in the SAR Watershed.
Monitor endangered birds on District lands per permit requirements, including the management of seasonal contractors.
Santa Ana Sucker monitoring and conservation.
Permit maintenance.
Oversight and cooperation with contractors, interns, and partners to maximize efficiency in the attainment of mission and goals.
Reporting of the annual achievements of the District’s Natural Resources Program to the Regulatory Agencies and public.
III Non-Core Activities
Care of and finding suitable housing for a major wildlife specimen collection.
Production and dissemination of educational materials.
IV Group Goals for FY 2020-21
Monitor Endangered Bird Populations in the Prado Basin and Watershed – The Department leads the monitoring of endangered birds in the Prado Basin and the SAR Watershed. This activity also keeps the District in compliance with Regulatory Permits for Water Conservation and other District projects. Endangered bird populations will be monitored and managed in the Prado Basin and throughout most of the SAR Watershed.
Integrate Rigorous Statistical Analysis into Habitat Monitoring – The FWS wants statistics integrated into the monitoring of habitat recovery following inundation due to water conservation in the Prado Basin. We are working with the ACOE and FWS to determine an appropriate methodology.
3-42
NATURAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Santa Ana River Watershed Program – Staff, will participate as a member of the governing Board of Santa Ana Watershed Association (SAWA), which is the organization removing Arundo throughout the SAR Watershed. The Natural Resources Director or his designee will attend regular meetings, prepare, review, and edit various documents including amendments to bylaws, operational procedures, budgets, annual work plans, and reports in directing management activities in the upper watershed.
Mitigation/Habitat Restoration in Prado Basin and OC – Staff will prepare, implement, monitor, and report upon habitat restoration and wildlife populations in compliance with permit conditions for Prado Water Conservation and other District projects and activities.
Ongoing Removal of 5,000 acres of Arundo – Staff will help manage and monitor the efforts to keep Arundo out of the 2,500 acres initially treated with Proposition 13 funding, and that removed before and since including the OCWD Board approved 350 ac 2015 Highway Fire burn site in the Prado Basin.
Participate in Additional Arundo Removal – Natural Resources staff will participate in watershed efforts that are controlling Arundo and oversee Arundo control on OCWD lands in the Prado Basin. Staff will track and report funding received and resulting activities.
Monitor and Control Problematic Invasive Species – Quagga Mussels, Polyphagous Shot Hole Borers, and other non-native species that have the potential to cause great harm in the watershed will be monitored and cooperatively controlled when possible.
Prepare Permits for District Projects and Activities – Natural Resources Staff will prepare permit applications and negotiate conditions cooperatively with Engineering, Planning, and staffs of other Departments for various District projects including Prado Sediment Management Study, Enhanced Water Conservation at Prado, Burris Basin, and other facilities and operations as needed.
Participate in Project Planning and Operations – Natural Resources staff will continue to participate cooperatively with other departments in preparation of environmental documentation and other planning efforts on Santiago Creek, and on all facilities in cooperation with Engineering and Operations.
Educational Material – Natural Resources staff will continue to compile interpretive materials, including live-mounted specimens, reports, tours, and presentations.
V Pending Activities (Not Being Addressed Due to Insufficient Resources)
Major activities that are not being implemented include:
Clean up of Chino Creek into the Prado Basin – Eucalyptus and several other problematic non-native plants have invaded Chino Creek and are interfering with flood control, water flow, habitat restoration, endangered bird management, etc. The creek is isolated and could be cleaned as a separate unit.
3-43
NATURAL RESOURCES
Orange County Water District FY 2020-21 Work Plan
Clean up of the Riverside County portion of the Santa Ana Canyon – Orange County is implementing Arundo-control in the canyon, which will help keep the OCWD recharge area free of debris. However, they are not including the part of the canyon just upstream in Riverside County. Giant reed from this upstream section will re-infest their work areas unless it is removed.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
Planning and Implementation Assistance for Prado Feasibility Study – Staff will continue to support study development and implementation. Full implementation of the SAR Watershed Program – There is a need to identify additional funding sources to maintain the watershed from regrowth of Arundo Donax. SAWA has some funds, but additional funding is needed to prevent Arundo from regrowing in the watershed.
Organize Data in Preparation for Publication – Staffs are organizing and analyzing existing data in preparation for potential publication of watershed vireo information in a scientific journal.
3-44
FINANCE
Orange County Water District FY 2020-21 Work Plan
FINANCE
Summary Information
Existing Staff - 13 FTEs
1 –CFO/Treasurer
1 – Accounting Manager
1 – Finance Manager
4 – Staff Accountants
1 – Senior Accountant (Payroll)
3 Principal Project Accountants
1 – Accounting Clerk
1 – Field Representative/Meter Reader
Mission
To perform the District’s accounting, finance and treasury functions to maintain the District’s strong financial position, high credit ratings, reliable reporting of budgets,
3-45
FINANCE
Orange County Water District FY 2020-21 Work Plan
revenues, expenditures and investments and to ensure that adequate financial controls are in place to accurately record financial transactions, communicate financial results, and protect the District’s assets. In addition, to ensure the financial records are maintained in accordance with generally accepted accounting procedures and guidelines as established by state and federal agencies.
Key Issues for FY 2020-21
Adapt District finances to fund PFAS related projects.
Issue debt to efficiently fund OCWD’s CIP at the lowest possible cost and optimize debt program by refinancing debt to reduce debt service costs.
Manage OCWD’s Investment Portfolio per the Board approved investment policy.
The systematic drawdown of the SWRCB SRF loan and issue short-term notes to fund the GWRS Final Expansion project.
Continue to ensure that internal controls are in place to provide assurance that assets are safeguarded and financial information is fairly stated. Review and update existing procedures and establish new procedures that will help expand the group’s analysis and reporting capabilities.
Continue the timely drawdown of SWRCB loan funds.
Submit the Comprehensive Annual Financial Report to Government Finance Officers Association for their award program.
Account Information FY 2018-19
ActualsFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 1,927,226 2,002,286 1,979,608Services and Supplies 71,015 122,400 142,500
Total $1,998,241 $2,124,686 $2,122,108
I FY 2020-21 Major New Initiatives/Programs
Financial planning for the new treatment systems for producers to remove PFAS down to state-mandated levels.
Securing the lowest cost funds with grant funding and cost recoveries for the PFAS related projects.
Continue to increase rebate earnings from wider use of the District’s purchasing card/single-use account program.
Secure the lowest cost short-term financing and grant funding for the GWRS final expansion project.
Accounts Payable working to implement and streamline the accounts payable process, which includes electronic/imaging, workflow management and electronic storage and incorporates the application of paperless digital record-keeping for the department’s large quantity of hard copy transaction records.
3-46
FINANCE
Orange County Water District FY 2020-21 Work Plan
Support of the District’s review of the operating costs of the Green Acres Program.
Continue Fixed Asset tagging and inventory.
Accounts Receivable is working to implement a secured online electronic filling of the Water Production Statements for RA provided with a secured certification by the producers.
II Core Activities
The Finance Department is primarily responsible for the District’s accounting and treasury functions, including debt and investment management, financial planning and analysis including rate setting, budgeting, accounting and control including financial reporting, payroll, accounts payable and accounts receivable, as well as working with various internal and external groups and agencies.
The core activities of the department are:
Process the District’s accounts payable, ensuring all payments and reimbursements are done timely, accurately and in compliance with policies and procedures along with state and federal regulations.
Process accounts receivable invoices and incoming payments timely, accurately, and in compliance with financial policies and procedures.
Maintaining the general ledger.
Administer and process the District’s payroll function, including accurate and timely payroll tax filings, year-end reporting, employee retirement and benefits payments, and other employee-related costs administered through the payroll function.
Monitor, track, execute, and complete all grant billings for the District’s general fund and capital projects.
Prepare annual budget and provide quarterly budget versus actual variance analysis and reporting.
Present to the board ratio analysis semi-annually.
Continue to review and update the R&R model.
Account for and audit various BEA exemption programs.
Provide monthly water production cost analysis to the water production department.
Maintain and update the monthly rolling cash forecast model.
Prepare monthly cash and investment holdings report.
Prepare and update water quality legal cost reports on a quarterly basis.
Process and calculate the District’s Replenishment Assessment (RA) and Basin Equity Assessment (BEA) billings, including any special water program billings. This includes on-going monitoring and reading of all the meters.
3-47
FINANCE
Orange County Water District FY 2020-21 Work Plan
Complete the financial information necessary for the District’s annual Engineer’s Report.
Prepare and submit quarterly sales and use tax returns, and any other financial reporting or compliance reporting as needed as it relates to the District’s finances.
Working with external independent auditors to complete the District’s annual fiscal year-end audit, pension plan audits, single audits (as necessary), and work with other outside agency auditors to fulfill any additional audit requirements.
Complete and submit a CAFR for a possible award.
To monitor, track, and report the District’s Reserve Funds.
Prepare and complete all annual reporting for District travel and expense expenditures in a timely manner.
Manage and invest the District’s cash in-house daily in order to meet the District’s cash needs. This includes an annual review of the District’s investment policy with the Admin/Finance Committee.
Continue to manage the treasury functions of the District, which includes ensuring all debt related payments are made timely for all debt issuances, state loans, and commercial paper. In addition, maintain compliance with all continuing disclosure requirements, review and renew all necessary debt administrative services including bank letters of credit, rating agency monitoring, trustee administration, and any other debt-related maintenance services.
Debt issuances – to initiate, support, analyze, and complete the execution of all necessary debt financings needed for the District’s capital projects.
Continue to review and work with various financial scenarios in order to make recommendations to seek and obtain the most economical financings to support the District’s capital projects.
III Non-Core Activities
Children’s Water Festival Accounting.
Contract administration and building maintenance billing operations for MWDOC occupancy expenses.
IV Group Goals for FY 2020-21
Review and update documentation of procedures for all accounting functions.
Review the Producer meter calibration reporting program and procedures.
Complete monthly closing of the general ledger, all account reconciliations, and accruals in a timely manner.
3-48
FINANCE
Orange County Water District FY 2020-21 Work Plan
Complete the annual independent audit and all necessary audit schedules more efficiently to complete the year-end audit on a timely basis.
Review the general ledger and all ledger accounts to ensure that revenues and expenses have been posted properly. This includes analyzing and researching any discrepancies and unusual variances.
Effectively and efficiently streamline the accounts payable workflow process, including matching, approving, and payment processing by working with internal departments to ultimately process vendor payments timely, accurately, and in compliance with adequate internal control processes.
Discover ways to streamline all processes and to continue to strengthen internal controls throughout the District in accordance with “Best Practices.”
Financial modeling to analyze and support the District’s annual RA/BEA rates established and approved by the Board on an annual basis. On-going forecasting and projections of revenue and expenses
Provide project accounting analysis for all of the District’s capital projects and work with all project managers to ensure that all project costs are properly accounted for and are within the project budget. This also reduces the burden currently placed with each project manager to provide financial analysis support for their projects.
Record, monitor, and ensure proper accounting for the District’s fixed assets and inventories monthly, including the proper accounting for depreciation and transferring assets from work in progress as projects are completed.
Look for refinancing opportunities for an economic benefit to the District.
Complete annual filings and certification of compliance with circular OMB-133 for all grant funding sources when required.
Manage and audit litigation settlement accounting.
Review and update all the assets in the R&R model.
Cross-training of staff in all accounting positions to provide better coverage, and to strengthen accounting internal controls with the ability to “rotate” staff in certain functions.
V Pending Activities
None
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
None
3-49
Purchasing
Orange County Water District FY 2020-21 Work Plan
PURCHASING
Summary Information
Existing Staff - 6 FTEs
1 – Purchasing Manager
1 – Senior Buyer
1 – Buyer
2 – Warehouse Technicians
1 – Senior Administrative Support Specialist/ Contracts
Mission
The Mission of the Purchasing Department is to procure reliable quality services and products, at a good cost and in a timely manner, using ethical procurement standards, to achieve a high level of assistance for the District.
3-50
Purchasing
Orange County Water District FY 2020-21 Work Plan
Key Issues for FY 2020-21
None
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 689,345 714,766 706,724Services and Supplies 32,473 42,720 46,500
Total $721,818 $757,486 $753,224
I FY 2020-21 Major New Initiatives/Programs
Set up an insurance program to cover requirements, renewals and maintain a filing system for the certificates.
Implement a procedure for fully electronic purchase orders from requisition through payment, thereby reducing paperwork.
II Core Activities
The Purchasing Department is responsible for:
Purchasing goods and services.
Assisting all workgroups with the issuance of a request for proposals (RFP) for goods and services.
Maintaining the warehouse.
Managing inventory.
Preparing, processing, and administering the District’s public works contracts and agreements.
Obtaining and tracking insurance certificates for contracts and agreements.
Maintaining filing system for purchase orders, contracts, and agreements.
Identifying, obtaining Board approval, and disposing of the surplus.
Maintaining records for District vehicles and equipment; assigning District identification numbers.
Locate new sources for procurement of materials, supplies, and services.
Prepare and issue Requests for Proposals (RFP’s) and Requests for Quotations (RFQ’s) for services and products to obtain the best pricing and good quality.
Meet with each Department quarterly to discuss requests and problems to ensure quality service is being provided.
Meet with the project managers to discuss contracts and agreements so that (1) we can process the documents expeditiously and address
3-51
Purchasing
Orange County Water District FY 2020-21 Work Plan
the agreement language issues that arise; and (2) provide an update on the status of the agreements/contracts, as needed.
Review and update warehouse, purchase order, and agreement services procedures and improve on receiving activities.
Administrator for purchasing card program, addressing issues that may arise, and monitoring cards.
Check safety procedures for warehouse receiving and storing goods, including chemicals.
Assist Departments for procurement of Department special needs/events.
Assist with reconfigurations of cubicles and offices.
Complete formal procedures manual to be submitted for approval.
III Non-Core Activities
Non-core activities conducted by the Purchasing Department include:
Meet with purchasing personnel from other water agencies to share information on new vendors, pricing, procedures, etc.
Attend seminars on procurement and warehousing for updated information to save money while still obtaining quality products.
IV Group Goals for FY 2020-21
Improve warehouse procedures and material handling; improve on warehouse storage at FHQ.
Assessment of all District vehicles – prepare a detailed report and analysis for the General Manager.
Surplus – research and implement procedure for cost-effective disposal of obsolete items.
Implement a procedure for fully electronic purchase orders from requisition through payment.
V Pending Activities
Preparation of a formal Procedures Manual for Purchasing
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
Additional warehouse space/warehouse cleanup
3-52
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
WATER QUALITY
Summary Information
Existing Staff - 13 FTEs
1 – Director of Water Quality
2 – Environmental Specialist Supervisor
1 – Senior Environmental Specialist/Analyst
2 – Senior Environmental Specialist
3-53
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
2 – Senior Environmental Technician
1 – Environmental Specialist
4 – Environmental Technician
Mission
Plan, coordinate, and implement water quality monitoring programs to (1) protect and evaluate groundwater basin and groundwater recharge supply conditions and (2) comply with regulatory requirements for drinking water wells, Water Reclamation permits, and OCWD NPDES permits.
Key Issues for FY 2020-21
PFAS Water Quality Monitoring: The Water Quality Department will continue to play a key role in supporting ongoing monitoring of Per- and Polyfluoralkyl Substances (PFAS) monitoring of groundwater, surface water, and treated water sources. OCWD is providing support to Producers for drinking water monitoring orders issued by the Division of Drinking Water (DDW). New drinking water advisory levels are expected from DDW in early 2020, and additional monitoring requirements are expected for drinking water sources. In addition to PFAS monitoring of drinking water sources, Water Quality staff continues to perform monitoring of the PFAS Pilot Treatment projects: OCWD BESS Pilot PFAS Treatment project and the YLWD Pilot PFAS Treatment project. In addition, PFAS monitoring will continue to include testing of groundwater monitoring wells and surface water sites throughout Orange County and the Santa Ana Watershed in order to provide water quality data to better understand the nature and extent of PFAS occurrence. Other PFAS monitoring efforts will likely include working with partners in the upper SAR watershed on projects such as the newly reconstituted SAWPA Emerging Constituents Task Force and coordination of further testing of various military sites in Orange County such as the former MCAS El Toro base, former MCAS Tustin base, and the Los Alamitos Joint Forces Training Base.
Groundwater Replenishment System (GWRS) Monitoring: Continue to implement water quality monitoring requirements for the final product water and groundwater monitoring wells in compliance with the GWRS permit, as well as recently reduced voluntary testing at monitoring wells. This is a high priority for the department, including assisting with the preparation of (1) regulatory quarterly reports, (2) the required Annual GWRS Report, and (3) the annual NWRI Independent Advisory Panel Meeting and supplemental tech memos. Use of the GWRS product water for injection at the Talbert Barrier for seawater intrusion, injection of GWRS water in the Mid-Basin Injection area located in Santa Ana, and surface spreading at the Forebay requires quarterly monitoring of 53 groundwater monitoring wells. Meeting monitoring schedules at both the Talbert Barrier, Mid-Basin, and Forebay recharge basins takes precedence and requires close coordination and scheduling with the Laboratory and other WQ programs to ensure maximum efficiency with sample loads and resources.
3-54
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
U.S. EPA Unregulated Contaminant Monitoring Rule Phase 4 (UCMR4): On behalf of basin Producers, OCWD has successfully met the monitoring and reporting requirements for the past UCMR1, UCMR2, and UCMR3 programs. The UCMR4 monitoring program is scheduled for over 3 years with monitoring begun in 2018 that must be completed in the year 2020. To accomplish this additional drinking water monitoring for Groundwater Producer’s (GWP’s), significant preparations and coordination are required. The additional UCMR4 monitoring challenges for the WQ Department require close coordination with GWP’s and the Laboratory to ensure (1) monitoring schedules are developed and met, (2) all required sample collection procedures and quality assurance are followed as required by the specific analytical methods, and (3) all reported sample results are properly entered, reviewed, and reported into the EPS SDWARS4 database with necessary sample results, QA/QC information, and all additional water system information per the EPA UCMR4 reporting requirements.
North Basin, Remedial Investigation/Feasibility Study: Continue to implement monitoring activities at monitoring wells to track the volatile organics contaminant (VOC) plume and to provide information for the VOC remediation plan in the North Basin area of the District.
South Basin Remedial Investigation/Feasibility Study: Continue to implement water quality monitoring activities at monitoring wells in southeastern Santa Ana to further investigate the extent of VOCs and perchlorate contamination.
GWRS Metals Mobilization Study: Continue to implement water quality monitoring activities to assess potential metals mobilization in groundwater near GWRS recharge facilities. A monitoring program was initiated as recommended by the NWRI GWRS Independent Advisory Panel to analyze for trace metals (arsenic is one metal of key concern) from selected wells in the vicinity and downgradient of the GWRS recharge basins. Monitoring data has confirmed some metals are mobilized along the groundwater recharge flow path due to the geochemical differences between GWRS water and the receiving groundwater aquifer. Monitoring continues to provide data to assess metals mobilization near the recharge basins.
Mid-Basin Injection Project: Continue to implement water quality monitoring activities for the Mid-Basin Injection (MBI) Project, which is monitoring the injection of GWRS water directly into the Principal aquifer. Compliance monitoring occurs at two multi-casing well sites (8 separate well casings) downgradient of four new injection wells.
OCWD Storm Water Permit: Provide field and technical support for the District’s GWRS Industrial Storm Water permit to comply with EPA’s National Pollutant Discharge Elimination System (NPDES) permit covering storm water management, discharges, water quality monitoring, and reporting requirements. Perform monitoring, site inspection tasks, and annual refresher training as approved in the District’s Storm Water Pollution Prevention Plan (SWPPP) and WQ monitoring plan. Under the newly adopted SWQCB stormwater permit, two stormwater sampling events must be conducted
3-55
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
between July and December, and January and June. The permit requires preparation of an annual report and regular electronic reporting.
Santa Ana River Monitoring Program (SARMON): Continue to implement the comprehensive surface and groundwater monitoring program recommended by the SARWQH study. Monitoring activities include sites on the Santa Ana River (SAR), Santiago Basin, and selected downgradient monitoring wells to provide data on travel time and to assess water quality changes that may occur after recharge of water from the Santa Ana River. Monitoring activities are regularly updated and revised based on the ongoing review of reported sample results and recommendations from the regular meetings of the SARMON Independent Advisory Panel (IAP). One specific focus of the monitoring program is to continue to monitor and evaluate the occurrence of Contaminants of Emerging Concern (CEC, including the recent addition of monitoring for PFAS such as Perfluorooctanoic acid (PFOA) and Perfluorooctane sulfonate (PFOS). Also, Santa Ana River water flowing into and out of the District’s Prado basin wetlands are monitored to evaluate changes in water quality and to evaluate the effectiveness of the wetlands for water quality treatment. Technical tasks for the SARMON program include but are not limited to assisting with the preparation of (1) the biennial report summarizing SAR monitoring results, (2) presentations or technical reports for the NWRI’s SARMON IAP annual meeting, and (3) completing the annual SARMON water quality program summary.
Coastal Seawater Intrusion Program: Continue to implement water quality monitoring activities to help assess possible seawater intrusion in areas such as the Talbert Gap, Bolsa Gap, and Sunset Gap. Recent monitoring results have shown possible seawater migration landward in the Sunset Gap and impacting a nearby Huntington Beach drinking water well. The Hydrogeology Department has drilled new monitoring wells to assess seawater intrusion in Bolsa and Sunset Gaps to provide information for assessing seawater intrusion. In recent years, over 30 wells have been constructed and added to the seawater intrusion semi-annual monitoring program for the Bolsa and Sunset Gap areas alone. Additional wells, 11 monitoring wells, have also been constructed in the East Newport Mesa Area to provide water quality data in areas of the groundwater basin that do not have any wells. These wells will help to delineate aquifer correlations and construct the annual Shallow aquifer water level (WL) contour maps. Water quality and water level data will aid in delineating seawater intrusion that could potentially impact Mesa WD and IRWD wells, assist with geologic correlations in east Newport Mesa and SW Irvine area, and help fill in data gaps to construct the annual Shallow aquifer WL contour map.
GWRS Applied Research and Operational Support: Provide assistance to the Research Department in the implementation of the OCSD LRV project “Determination of Enteric Virus Log Reduction Values (LRVs) from Orange County Sanitation District Plant No. 1 and No. 2.” The study will provide information for determining LRVs to be applied toward the AWPF regulatory requirements for virus removal.
3-56
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
Planning and Coordinating Water Quality/Laboratory Workload: Additional challenges facing the department to manage, track, schedule and coordinate the compliance and non-compliance monitoring activities are dependent on (1) Laboratory resources and analytical capacity, (2) GWRS and MBI monitoring activities, (3) GWP drinking water well state/federal monitoring schedules, and (4) other on-going District projects, research or focused studies, etc. These programs and available resources must be considered in weekly planning and assigning workload. The efficiency of the Water Quality field activities will be dependent on these factors, and resources to initiate monitoring schedules for newly constructed wells or locations for various projects (if approved; see below). Scheduling and coordinating workloads that maximize the Laboratory and Water Quality department’s efficiencies are challenging (i.e., maximum samples per extraction methods, etc.) to meet the water quality data information needs for the various compliance and non-compliance monitoring programs and research investigations.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 1,634,984 1,688,631 1,795,632Services and Supplies 312,811 372,800 307,400
Total $1,947,795 $2,061,431 $2,103,032
I FY 2020-21 Major New Initiatives/Programs
Field support and resources may be needed to monitor water quality from existing locations or new monitoring wells to be constructed for the projects listed below, pending Board approval. These are listed as potential programs/projects for planning projections only.
Expanded PFAS Monitoring and Producer Support: In response to the establishment of state Notification and Response Levels, assist Groundwater Producers with requests for expanded testing and coordination with Division of Drinking Water regulators. Continue pilot scale studies at production wells OCWD-BESS/1 and YLWD-21 to test various PFAS treatment media options and assess treatment results. In addition, Water Quality staff will assist in providing large quantities of water (55-gallon drums) from several groundwater production wells to outside laboratories for rapid small-scale column tests (RSSCT) of PFAS treatment media and assessment of treatment results.
Mid-Basin Injection (MBI) Centennial Project – Future injection wells in Centennial Park located in Santa Ana are planned like MBI-1, which was completed in April 2015. As part of the MBI expansion at Centennial Park, several new nested monitoring wells (SAR-12 and SAR-13) have been constructed and will be monitored to provide background water quality for future areas of GWRS injection. Monitoring activities will include
3-57
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
comprehensive baseline monitoring of the underlying aquifers before the start-up of the new Centennial Park injection wells. With the startup of the new injection wells, an intrinsic tracer test will begin and require more intensive monitoring to document the arrivals of GWRS water. Subsequently, quarterly monitoring will continue to assess changes in water quality over time as injected water migrates downgradient to the nested wells. As with MBI-1 and SAR-10/SAR-11 monitoring wells, monitoring will likely include monitoring for metals mobilization as well as an intrinsic tracer study.
South Basin Remedial Investigation/Feasibility Study - Phase I investigation included the construction of 6 nested wells consisting of 18 wells drilled to various depths. Water quality monitoring has been continuing for over two years at a semi-annual frequency. The Phase II investigation has commenced and included the construction of 7 nested wells within the study area to fill in data gaps at various depths and locations. Twenty-one monitoring wells have been drilled and were initially sampled by an outside contractor. Following initial monitoring, OCWD has taken over water quality monitoring activities to identify constituents of concern and levels of occurrence.
Water Quality Evaluation of Storm Water Runoff - Glassell site – The County of Orange has retrofitted an existing 10-acre office space site located in the City of Orange on Glassell St. to infiltrate stormwater on-site. The retrofit will include multiple EPA low impact development (LID) features to reduce stormwater run-off/pollutants and improve water quality. Possible LID features include bio swales, modular wetlands, permeable paving, and a subsurface cistern to treat stormwater and to retain the majority of stormwater on-site. The County has discussed collaboration with OCWD and the City of Orange, which may include water quality monitoring and analysis to address groundwater quality before and after infiltration.
Riverbed Filtration Project - Implement water quality monitoring of the Riverbed Filtration Project to assess the overall water quality changes pre-, post-treatment, and after percolation as measured by water quality in the nearest monitoring wells (AM-51/1 and AM-51A/1).
II Core Activities
The Water Quality Group is primarily responsible for (1) implementing water quality monitoring programs to protect and evaluate basin conditions, including emerging contaminants; (2) providing technical and field support for compliance programs, District projects, and research investigations; (3) disseminating water quality information and assisting with expansion and update of the WRMS database (historic and new water quality data); (4) reviewing and commenting on relevant water regulatory and compliance issues (e.g., drinking water, stormwater, de minimis permits, etc.); and (5) providing support to ensure that the District complies with regulations pertaining to the Safe Drinking Water Act and Clean Water Act amendments.
3-58
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
Core activities include:
Implementing surface and groundwater quality monitoring programs for (1) compliance with permits, mandated environmental and drinking water regulations, (2) District projects and research investigations, and (3) evaluating the ambient quality of the groundwater basin.
Groundwater Producer Drinking Water Well Monitoring - Scheduling and sampling groundwater producer wells for compliance with state/federal drinking water regulations for regulated and unregulated chemicals; reviewing, approving and reporting chemical data electronically to the state on behalf of the groundwater Producers; assisting with data compilation for the groundwater Producers’ Annual Consumer Confidence Report, Public Health Goals Report, and Vulnerability Assessments.
Implementing basin wide monitoring for constituents proposed for regulation and new emerging chemicals of concern (CEC) to assess occurrence and distribution within the Orange County Groundwater Basin and potential impact to the groundwater Producers and OCWD.
Overseeing and performing compliance monitoring activities at groundwater monitoring wells specified in the GWR System permit and permit Amendments, including water used for blending, final product water, and coordinating with contract labs for selected analyses not performed by OCWD’s Main Laboratory (e.g., asbestos, dioxin, radioactivity, etc.). GWRS monitoring activities include both Forebay and Talbert Barrier locations, Mid-Basin Injection, and relevant research investigations associated with tracer and intrinsic studies to (1) establish groundwater flow paths and travel time to the nearest wells (potable and monitoring), (2) assess metals mobilization issues, joint research projects, and (3) assess treatment processes and changes in water quality after time underground, etc. through joint research endeavors.
Implementing a surface and groundwater quality monitoring program to assure the continued safety of the Santa Ana River as source water for groundwater replenishment (SARMON monitoring activities).
Ensuring compliance with the District’s NPDES general de minimis dewatering permit including weekly notification, sampling, treatment of purged groundwater (as needed), data analysis, and preparing monthly compliance reports.
Reviewing and approving new water quality data for the District’s WRMS database, compiling and analyzing data for reports and internal staff, the Board, and groundwater Producers.
Coordinating with the Regional and State Water Quality Control Boards to provide appropriate water quality data to assess compliance with Basin Plan objectives for the SAR, TMDL issues, and other water quality river issues relevant to the protection of the OCWD groundwater basin.
3-59
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
Performing semi-annual water quality monitoring of coastal wells to assess the extent of seawater intrusion; coordinating with Hydrogeology on reviewing and revising program as new data become available.
Assisting with field data collection for the semi-annual basinwide water level monitoring program to identify threats to the basin (i.e., groundwater overdraft, seawater intrusion, etc.) and provide groundwater elevations of basin aquifers measured six times annually.
Fulfilling water quality and water resources information requests from the public, groundwater Producers, and regulatory agencies; responding to special data requests for external site investigations and litigations.
Tracking, reviewing, and addressing new emerging contaminants of concern; evaluating basin water quality conditions for emerging contaminants, assessing management and response strategies, coordinating with Public Affairs and groundwater Producers with water quality information.
Preparing reference materials and presentations on water quality issues, participating on advisory committees specific to water quality issues of concern to OCWD and groundwater Producers.
Reviewing and commenting on proposed regulations such as federal and state maximum contaminant levels (MCLs), state notification levels and public health goals, unregulated chemicals, NPDES permits, emergency regulations, etc. relevant to the District and groundwater drinking water source monitoring.
Responding to and coordinating with regulatory agencies on emergencies and hazardous materials spill, fire fighting run-off, etc. that may affect groundwater quality. Perform WQ monitoring as needed to assess potential discharge impacts to recharge facilities or groundwater.
Assisting with the preparation of regulatory compliance reports and other water quality reports.
III Non-Core Activities
Non-core activities (secondary priority compared to core activities) conducted by the Water Quality Group include:
Serving on water quality and project advisory committees for ACWA, WEROC, etc. on emerging water quality issues relevant and beneficial to OCWD as managers of the groundwater basin, preparing for water resources emergencies (i.e., earthquakes), etc.
Assisting other water agencies and Public Affairs in addressing water quality issues, emerging contaminants, and tracking and assist in preparing comments on proposed relevant drinking water-related regulations.
Provide enhanced staff development (internal and external) and mentoring to take on higher-level duties and responsibilities; enhance and broaden cross-training to increase flexibility and ability to respond to changing conditions.
3-60
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
IV Group Goals for FY 2020-21
Administer Water Quality Monitoring Programs: Ensure water quality sample collection is performed with high quality and analyzed for (1) compliance with mandated drinking water quality regulations and regulatory permits, (2) District projects and investigations, and (3) evaluating the quality of the basin (e.g., seawater intrusion in coastal areas). Evaluate new emerging chemicals of concern and coordinate with the Laboratory to implement 2020-21 compliance monitoring requirements for drinking water sources, UCMR4 monitoring requirements, GWRS compliance monitoring locations, focused studies, and to ensure maximum use of resources for both departments. Work with Laboratory to effectively and efficiently schedule analysis for new changes to testing frequency within GWRS groundwater and SARMON programs.
Data Management Activities: Ensure new data are reviewed with high-quality assurance and approved into the WRMS database for end-users; submit Producer compliance data electronically to the SWRCB Division of Drinking Water (DDW) database; prepare annual water quality schedules for DDW and groundwater Producers; prepare annual data summaries for groundwater producers for the Annual Consumer Confidence and triennial Public Health Goals reports; prepare annual water quality data summary for OCWD’s Engineer’s Report, GWRS quarterly/annual reports, and SARMON biennial report; prepare and submit Annual Industrial Stormwater report and compliance stormwater monitoring results electronically.
Water Quality Regulatory Activities: Review and comment on newly proposed state or federal drinking water standards (MCL), state notification levels and evaluate potential impacts to groundwater basin and coordinate with groundwater Producers; continue to track and comment on proposed non-drinking water regulations relevant to OCWD’s activities (e.g., state NPDES general permits, stormwater permit, etc.); monitoring federal and state regulatory schedules for upcoming proposed drinking water regulations – review and comment during public comment period.
Implement the Santa Ana River Monitoring Program: Continue to implement the long-term Santa Ana River Monitoring (SARMON) Program in a joint effort with Regulatory Affairs. Manage and provide oversight to ensure monitoring activities are completed based on recommendations of the NWRI convened SARMON Independent Advisory Panel.
Talbert/Bolsa/Sunset Gaps Seawater Intrusion Monitoring: Implement the seawater intrusion monitoring program in the Talbert/Bolsa/Sunset Gaps as recommended by the Hydrogeology Group to provide water quality information to aid in assessing the extent and areal distribution of seawater within these gaps. Water level (some locations measured six times per year) and semi-annual water quality monitoring activities are conducted to provide information for Hydrogeology’s assessment to evaluate the landward migration of seawater and adjust monitoring activities based on findings.
3-61
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
Water Quality Protection: Activities include tracking, reviewing and addressing new chemicals of concern, evaluating basin conditions or source waters potentially used for groundwater replenishment (e.g., PFAS, perchlorate/chlorate in the Santa Ana River); monitor and review media and research reports; coordinate with regulatory agencies on upcoming new water quality issues; provide field water quality monitoring support for Board approved projects that authorize construction of new monitoring wells for District projects and investigations.
New Water Sources: Implement groundwater monitoring activities for short-term focused studies related to recharge enhancement (storm flow and stormwater infiltration projects; river water-sediment removal and percolation studies); provide compliance testing for newly constructed groundwater Producers’ drinking water wells and new monitoring wells approved by the Board for specific water quality studies; evaluate new source waters for GWRS (e.g., possibly monitor flood control channel waters for diversion to OCSD for GWRS, SARI Line water quality studies, etc.).
Aquatic Weed and Pesticide Control: Continue to coordinate with Forebay Operations to use non-chemical methods to address pests (e.g., midges at recharge basins) and vegetative growth at the wetlands in lieu of a chemical application. Non-chemical strategies avoid (1) coverage under the SWRCB aquatic weed and pesticide NPDES permits, (2) pre- and post-water quality monitoring and analysis of the applied aquatic pesticides, (3) preparation of regulatory reports, and (4) issues of the District applying chemicals to water bodies potentially tributary to the river and/or underlying groundwater.
Standard Operating Procedures (SOPs): Review and update department SOPs and conduct periodic refresher training.
Improved Water Quality Monitoring Efficiency
Assess new methods and strategies to increase field productivity without compromising the quality of sample collection or integrity of sampled water.
Improve sample collection equipment and sampling procedures; review, revise, and finalize standard operating procedures and implement processes to increase efficiency and productivity. Continue with evolving department-wide cross-training programs.
Evaluate options to streamline specific monitoring programs for broader coverage, increase efficiency, and reduce sample load to the laboratory.
Continue to research and improve mobile carbon treatment systems and equipment decontamination procedures. These systems help to address high concentrations of volatile organic compounds (VOCs) and chemicals that exceed regulatory limits or notification levels (e.g., perchlorate and 1,4-dioxane), which require treatment of purged water prior to discharge.
Continue to evaluate methods to forecast optimum schedules to change-out spent carbon in mobile treatment units to avoid breakthrough and to address new contaminants requiring removal prior to discharge.
3-62
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
Research new technologies for automating field data collection and documentation tasks.
Conduct Field Site Inspections to observe and optimize safe practices and correct procedural drift.
Storm water monitoring of the Santa Ana River and tributaries to OCWD’s recharge facilities.
Non-point source water quality monitoring on the river and tributaries near OCWD’s recharge facilities.
Quarterly or monthly water quality monitoring of upper SAR watershed wastewater discharges; investigate water quality issues originating from the upper watershed that may potentially affect the Orange County groundwater basin (e.g., PFAS, 1, 4-Dioxane, chlorate, NDMA, and other emerging constituents).
V Pending Activities
Major activities that are reduced, not being implemented or conducted include:
Implement more enhanced quality assurance data review protocols for data analysis and tracking of water quality concerns to identify developing water quality issues (e.g., increase in color, seawater intrusion, volatile organics, SAR monitoring, upper watershed, etc.); provide notification to OCWD managers and stakeholders; prepare semi-annual reports, as needed.
Develop and prepare an annual Water Quality report of the basin (deferred for several years) – strive to prepare an initial report with multi-department input in the near future.
Active attendance and involvement with water associations and agencies on water quality issues relevant to OCWD and groundwater Producers.
VI Staff Addition Needed for FY 2020-21
The Water Quality Department is requested the addition of one full-time Environmental Technician position. Over the past several years, the overall workload for the Water Quality Department has increased, and there is a need to add a position to maintain the water quality field monitoring workload as well as increased water quality administration workload. The addition of many new monitoring requirements related to PFAS that include drinking water monitoring orders and pilot treatment facility monitoring along with many new wells added for the GWRS Mid-Basin Injection Project, the North Basin Groundwater Protection Project, the South Basin Groundwater Protection Project, and the Coastal seawater intrusion monitoring in the East Newport Mesa and Alamitos Barrier programs are some of the primary reasons driving the need to add water quality field staff member.
3-63
WATER QUALITY
Orange County Water District FY 2020-21 Work Plan
VII Future Issues
In the next several years, the District will need to consider the following issues and the associated resources and costs.
Evaluate and assess resources and options to meet the increasing new water quality monitoring workload generated by expanding projects, new projects, focused studies, and research partnerships (i.e., PFAS, UCMR, GWRS injection or spreading, metals mobilization, tracer studies, SBGPP, NBGPP, seawater intrusion, etc.) with existing staff.
Evaluate and purchase more efficient sampling equipment to improve productivity with field monitoring activities, treatment of purged groundwater, and replace aging vehicles, as needed.
Complete the installation and begin use of the new FLEXICON Bulk Bag Discharger System for filling of carbon vessels adherent to safety recommendations provided by the Risk and Safety Department.
Adapt to (1) increasing new regulations requiring new monitoring activities, (2) implementing new and relevant research investigations, (3) researching enhanced protocols for equipment decontamination, and (4) assuring high-quality assurance with all field tasks and activities.
Provide field support to monitor North Basin Remedial Investigation monitoring wells and associated monitoring activities for the treatment facility in compliance with future treatment permit requirements.
Provide field support for the South Basin Remedial Investigation. Future monitoring wells will be needed to provide WQ data to delineate the extent of contamination and to evaluate the feasibility of an interim groundwater remediation/containment system.
Continue to provide field support for the GWRS project that includes enhanced monitoring activities at select downgradient wells for new areas in the basin, receiving GWRS water to (1) establish baseline conditions, (2) monitor metals mobilization, and (3) evaluate/assess changes in water quality.
3-64
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Summary Information
Existing Staff – 32 FTEs
1 – Laboratory Director
1 – LIMS - QA/QC Administrator
4 – Supervising Chemists
6 – Senior Chemists
11 – Chemists
1 – LIMS-Data Analyst
1 – QC Chemist
3-65
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
3 – Senior Laboratory Technicians
4 – Laboratory Technicians
Mission
Provide high quality, timely, and efficient analytical services to support the Groundwater Producers’ groundwater source water quality monitoring and unregulated contaminant monitoring requirements, as well as the District’s water quality testing needs for groundwater quality assessment, operational support monitoring, permit-required water quality monitoring, and applied research in support of Basin management activities.
Key Issues for FY 2020-21
Laboratory Information Management System (LIMS) – Work with IS Department staff to enhance the stability and extend the capabilities of Aspen to extend its useful life. Begin to replace existing modules starting with instrument interfaces and then reporting tools, with the goal of developing an entirely non-Microsoft Access-based system. Overall objectives include improved LIMS to WRMS transfer routine, more efficient sample processing/tracking and quality control, and the development of administrative tools in LIMS, which increase the ability of Lab staff to modify LIMS without writing source code or working directly with database tables.
Improve the operating environment by installing LIMS in a virtualized Microsoft Windows Server environment, eliminating obsolete hardware, operating systems, and improve disaster recovery capabilities.
Upgrade instrument software to implement Windows 10 throughout the laboratory
Work on standardizing our instrument software versions, templates, and file outputs
Make sure any changes to methods from internal audits are implemented in Aspen (new RDLs, new blank limits, new QC Type codes for MDL tool).
Verify/input all RDLs, DLRs, MCLs, ALNs and maybe QC limits in Aspen
Make new Aspen-Based master QC documents, with QC limits, RDLs, MCLs, DLRs, ALNs, true values, QC requirements, etc., if practical
Work on new cover sheets for Aspen data packets that clarify approval certifications and signatures
Work on LabDrive network location by creating a coherent architecture of subfolders, locking them down to avoid editing them, and migrating the files from NLab drive
Try to develop an Aspen/WRMS tool to get a sample data to analysts before sample login
Work out data mining and calculation sheets for Lab Techs for their ongoing DOCs
Work on a more efficient QC Chart creation tool
Federal Unregulated Contaminant Monitoring Rule – UCMR – All of the Groundwater producers with >10,000 service connections must complete the EPA UCMR4 monitoring requirements from 2018-2020. It will continue the process of List 1 and 2 assessment monitoring for a total of 28 constituents using the following EPA Methods: 525.3, 552.3, 530, 541 and the existing methods: 200.8, 300.1 & SM5310C until July 2020. As EPA 559 (nonyl phenol) and EPA 533 (25 PFAS) are currently under consideration to be included in
3-66
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
UCMR 5 (2023-2025), the lab is planning to add a new LC/MS/MS system to apply for these method accreditation in 2021-2022 to be ready for UCMR 5 monitoring program.
GWRS Permit & Operational Support – The Lab continues to generate operational and permit compliance data in support of the GWRS project. Regular operational plant monitoring (weekly/monthly/quarterly) was reduced in May 2017 after a comprehensive review of historical water quality data in consultation with the Water Production staff. Furthermore, the sample load from quarterly comprehensive testing at 40+ GWRS groundwater monitoring locations was significantly reduced, with most organic constituents only needing to be tested annually. Additional testing support will be required in FY 2020-21 for new groundwater monitoring wells installed as a part of the Mid Basin Injection (MBI) Centennial project. In accordance with the 2018 Recycled Water Policy, the Lab adds UV, TOC, DOC, UV Absorbance tests to the Quarterly GWRS-FPW grab sample. Laboratory staff members continue to coordinate sample loads, emerging chemical compounds and investigations with the Water Production Group as well as other departments and OCSD.
Per and Polyfluoroalkyl Substances (PFAS) Monitoring for Drinking Water Samples – The state DDW announced a new drinking water Notification level for PFOA and PFOS as 5.1 parts per trillion (ppt) and 6.5 ppt, respectively in August 2019. In response to DDW-issued monitoring orders, the many Producer well sites have been tested for PFAS compounds. The Lab has received accreditation for EPA 537.1 (18 PFAS compounds). In response to the increased PFAS analytical workload, the Lab is recommending the procurement of a third LC/MS/MS system that will be dedicated to the PFAS analysis. As the sensitivity of a new system will 3 to 5 times more than the lab’s oldest LC/MS/MS system (AB SCIEX 5500). Additionally, a new system will be required to support the method development of the new EPA Method 533 PFAS analysis that may be required for UCMR5. The Lab will evaluate simplicity, robustness, sensitivity, ease of implementation and monitoring requirements of EPA Method 533 which requires weak anion exchange SPE and a direct injection technique through isotopically marked standard recoveries in drinking water.
GWRS Optimization Research & Development – The Lab continues to support GWRS–related applied research led by the Research & Development (R&D) Department. Ongoing support includes water quality testing of potential replacement RO membrane during their 6-12-month trial periods and testing in support of periodic UV-AOP pilot reactor experiments investigating process optimization and disinfection byproduct (DBP) formation. Ongoing grant-funded research projects requiring lab support include those supported by the Water Research Foundation (WRF) and the US Bureau of Reclamation (USBR).
North & South Basin Remedial Investigations and Feasibility Studies (RI/FS) – Both the North Basin and the South Basin RI/FS efforts continue to require laboratory support and have been expanded with additional well monitoring locations. Some of these samples were contracted to an outside commercial lab for the past 2 years due to its matrix issues. Beginning in Oct. 2018, the Lab began analyzing these samples again using a reduced target list of 71 VOCs which include all required analytes. Periodically, EPA and state oversight requires split sampling events, assessment study Proficiency Test (PT) Study samples, and associated Level 4 QC documents and reporting top 5 sizable unknown peaks through library search. These events require significant extra staff time and effort, and 1-2 of these types of events are anticipated in FY 2020-21 for the North Basin Project.
3-67
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
Santa Ana River Monitoring (SARMON) Program – The SARMON program requires monthly, quarterly, and annual testing at surface water and groundwater monitoring sites for a wide range of inorganic, organic, and microbiological contaminants. Related to SARMON, OCWD has embarked on an effort to better characterize sources of PFAS in Santa Ana River water, particularly storm flow, and these efforts will continue in 2020-21.
Move orthophosphate analysis to a more stable instrument platform – Orthophosphate is currently being analyzed on an 11-year-old Lachat flow injection analyzer (FIA) system which has recently been experiencing software stability problems and is no longer fully supported. The system is a legacy system, previously used for analyzing ammonia and total Kjeldahl nitrogen (TKN). The computer controlling the system is still operating on Windows XP and cannot be upgraded without major hardware upgrades to the now-obsolescent FIA, so the Lab recommends purchasing a single channel FIA or a discrete analyzer system to analyze orthophosphate.
Account Information FY 2018-19
Actual FY 2019-20
Budget FY 2020-21
Proposed Budget
Salaries and Benefits 3,978,912 4,434,305 4,557,062Services and Supplies 1,381,622 1,477,600 1,509,600
Total $5,360,534 $5,911,905 $6,066,662
I FY 2020-21 Major New Initiatives/Programs
The laboratory is a service-oriented department, and we continue to provide analytical support to a wide range of District programs. New initiatives and support will be based on specific project requirements within several departments and investigations.
Develop additional shorter chain (<C12) PFAS testing methods using an automated SPE or a direct injection technique for robustness, sensitivity, and simplicity.
GWRS Groundwater monitoring – two new monitoring wells for the MBI Centennial Project.
Provide analytical support for the PFAS Pilot Study for PFAS Treatment
North and South Basin RI/FS efforts
Bi-annual State ELAP Audit and adopting TNI quality system by early 2022.
Complete the update of the instrument software for Windows 10 conversion.
Investigation of a local occurrence, fate, and transport of PFAS compounds.
Investigate potential approaches to developing the proposed analytical methods such as EPA 524.3, EPA 533 and EPA 559 for the UCMR 5 monitoring program scheduled on 2023-2025
II Core Activities
The Philip L. Anthony Water Quality Laboratory utilizes cost-effective analytical services in support of all monitoring programs and projects required by the District. Water quality data generated by the laboratory provides critical analytical information needed to make timely, accurate decisions for regulatory requirements as well as the direction and support of District
3-68
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
policies. Our facility is designed as a compliance-monitoring laboratory certified with the State of California and US EPA.
Basic core laboratory activities include:
Support Groundwater Producer’s required drinking water quality compliance testing and source assessments.
Support for both the GWRS and Green Acres Project (GAP) facility with monitoring for both permit requirements and operational feedback.
Support the District’s basin-wide groundwater and surface water monitoring programs to provide information supporting basin management. Ensure proper method compliance for state and federal drinking water requirements. Protection of the Basin and the SAR through analytical monitoring.
Support and direction of emerging contaminants and water quality issues for both GWRS plant and basin-wide concerns.
Procurement of needed analytical State Certifications with the SWRCB, as well as the development of any needed EPA methodology. Support federal monitoring programs as requested by the Groundwater Producers approved by District management – UCMR.
Support investigations in both treatment research and in-house analytical methodologies. Provide solutions to improve cost-effectiveness - both within plant processes as well as with laboratory procedures.
III Non-Core Activities
The Laboratory’s support has always been a strictly core activity department without many non-required duties. This has been based on years of natural growth in workload, which has caused all non-essential tasks to be dropped. Non-core activities (secondary priority compared to core activities) conducted by the Laboratory group include:
Applied research activities to develop new uncertified research analytical methods.
Support for public relations tours and NWRI investigations and studies.
Support of the Department of Homeland Security and CAMALnet investigations for emergency response.
IV Group Goals for FY 2020-21
New Instrumentation - The new Autotitrator will be installed in the inorganic lab to provide enhanced performance and the following benefits not/partially available with the 12-year-old system, which is at the end of its useful life expectancy:
Capability to transfer data to Aspen electronically instead of the manual operation.
Improved data quality and productivity of reporting temperature, pH, electrical conductivity, alkalinity, and phenolthalein alkalinity for the plant and field samples.
Ability to analyze one sample for all the required parameters.
The availability of an annual service support plan is guarantied and less expensive.
3-69
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
Greater staff efficiency
The new software will be compatible with Windows10 for gaining the automated data transfer functionality.
GWRS Operational, Research, and Compliance Support – Laboratory support of the GWRS
are critical in maintaining compliance and permit goals. We will continue to support all process
investigations that require analytical data. Total support of the GWRS (both plant and related
groundwater monitoring) represents nearly 30% of the workload received by our department.
Support of GWRS research on the proposed RO concentrate recovery pilot studies will be
required within this budget cycle.
Emerging Contaminant Method Development and Improvement – The laboratory seeks the
following improvements and enhancements to its current emerging contaminant methods using
the proposed new LC/MS/MS system:
Lowering the detection limit for sucralose from 100 ppt to 10 ppt or lower, in support of RO removal efficiency demonstration.
Assessing the possibility of using direct injection for the CEC method to enhance throughput by avoiding sample extraction prior to analysis. Typically, the direct injection does not permit the same level of accuracy and sensitivity at very low concentrations yet may be suitable for many District samples.
Develop EPA 533 (25 PFAS) using a weak ion SPE and EPA 559 (nonyl-phenol).
SWRCB-ELAP’s TNI 2016 Quality Standard – It is expected that by mid-2020 SWRCB will adopt new regulations now in the rulemaking process, which will start the 3-year window to implement TNI 2016 Quality Standard. The lab will have its next ELAP audit in the calendar year 2020. The new regulations will require third-party auditing, and it’s currently unclear if that will be part of the 3-year implementation schedule or go into effect immediately. ELAP will have a new fee schedule that will coincide with the new regulations. Certification fees may go down to perhaps one half to two thirds the current amount of approximately $10,400, but the Lab expects to pay an additional $5,000 to $15,000 for the required third-party audit. We have many QA/QC projects planned, and TNI will require more. As we create and implement more QA/QC systems, they will need to be maintained.
V Pending Activities
Major activities not being fully supported include:
Outsourced monitoring – EPA 504.1 (EDB/DBCP), EPA 548.1 (endothall), EPA 508 (organochlorine pesticides), EPA 515.4 (chlorinated phenoxy acid herbicides), and EPA 556 (formaldehyde), bacteriophage, radioactivity, asbestos, and dioxin monitoring needs are all farmed out to specific contract labs. This is currently a cost-efficient approach by reducing chemical cost, and staff overtime as many of these tests are required infrequently, especially after recent monitoring program reviews and careful reductions. Based on current sample loads, phenoxy acid herbicides, endothall, formaldehyde phage testing does not appear to have an increased focus within District monitoring programs, which would require in-house monitoring.
3-70
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
Method Development – As we continue to increase analytical capabilities within overall monitoring support, it has been difficult to address future support requirements such as bringing on-line 8 Nitrosamines using GC/MS/MS using Solid Phase Extraction (SPE), and 10 ppt RDL for Sucralose using LC/MS/MS. A specific area of concern is based on CEC monitoring and the use of the LC/MS/MS system for both drinking water and wastewater samples. Increased support loads on this system can generate workload backlogs, and thus will influence any additional method development support using this system. Proper sample load projections must be utilized to determine these future analytical support requirements.
Research Activities and Agency Meetings – The Laboratory continues to provide limited support of District research activities. However, it is critical that these support requirements be properly coordinated with laboratory resources. This budget cycle may provide some additional support windows for investigations, especially if compliance requirements can be reduced to annual samplings. Issues concerning CEC monitoring and analysis of new targets move quickly. Thus it is critical for laboratory staff members to attend meetings with other agencies and researchers that are providing similar support. The information gained from such meetings has helped shape our support and target lists. Attending these informative meetings is based on workload requirements and compliance duties.
CAMALnet (California Mutual Aid Laboratory network) & Department of Homeland Security Support – There are still efforts at the State and Federal levels to address water security issues, and the overall coordination of analytical support. Based on workloads and duties, we have not been an active player in supporting these groups. The development of specific methods to address potential targeting of water resources is currently not within our scope. The District’s laboratory will continue to monitor the progress of these programs, through adjunct participation of CAMALnet (California Mutual Aid Laboratory network) and Department of Homeland Security. This state-level program includes active participation by SWRCB and MWD addressing these water security/analysis related concerns.
VI Staff Additions Needed for FY 2020-21
None
VII Future Issues
In the next two to three years, issues the District will need to consider include:
Continued laboratory support of the unregulated contaminant monitoring rule (UCMR). UCMR 5 monitoring will run from 2023 until 2025; an annual program audit by EPA and the method compliance will be required within the next several budget cycles. The Lab will investigate potential approaches to developing the proposed analytical methods: EPA 524.3, EPA 533, and 559.
Conditions may arise where we need to develop a more sensitive analytical method for PFAS, sucralose, pharmaceuticals, and other synthetic chemical compounds. LC/MS/MS or GC/MS/MS systems could be utilized to achieve these lower reporting levels.
As cited above, the Hydrogeology department has expressed interest in monitoring specific targets at lower than current reportable levels. Methyl tertiary butyl ether (MtBE) and Bromate are two such examples, where lower reportable levels would benefit monitoring
3-71
PHILIP L. ANTHONY WATER QUALITY LABORATORY
Orange County Water District FY 2020-21 Work Plan
programs by identifying the leading edge of contamination plumes, or an earlier notification of water quality concerns before exceeding an MCL. Other analytical methods are currently available that would provide enhanced sensitivity to address these needs, depending on the target. Again, LC/MS/MS or GC/MS/MS could be utilized to achieve these lower levels of reporting. This would require the acquisition of these instruments to provide this enhanced monitoring support.
We continue to get feedback from State officials and other laboratories that speciation of arsenic may be required as a future water quality monitoring criterion. As with the examples above, this would require other hyphenated techniques – liquid chromatography followed by HG-ICP/MS analysis to generate this level of data. We will continue to monitor this future requirement, which may require adjustment to our analytical capabilities.
UV/AOP treatment within the GWRS continues to warrant further investigation and research. Disinfection By-Products (DBPs) specific to this treatment technology have not been fully studied or investigated. This is an area that should be developed as an “investigative” monitoring program.
We continue to develop the analytical techniques to detect extremely low levels (parts per trillion: ppt) of 1,2,3-Trichloropropane (TCP), 1,4-dioxane (0.1-0.2 ppb), Methadone, Nitrosodiethanolamine (NDELA), p-Chlorobenzene Sulfonic Acid (p-CBSA), Methyl Isothiocyanate (MITC), and Sucralose. Some of the target compounds are moderately removed within the GWRS treatment process and could be linked to OCSD source control issues. The laboratory continues to monitor persistent emerging contaminants using automated solid-phase extraction (SPE) techniques and tandem mass spectrometry systems.
The District continues to strengthen our interactions and communications with Orange County Sanitation District’s laboratory and source control programs. This relationship has benefited many of the water quality monitoring and characterization projects that have impacted our processes: NDMA formation study, 1,4-dioxane source control, chemicals of emerging concern (CECs), etc. We continue to see potential benefits in collaboration and regulatory alignment with OCSD divisions, as we further investigate new targets, GWRS performance, and phase II final expansion project.
Constituents of Emerging Concern (CECs) continue to receive political attention as a significant water quality issue. As our laboratory supports the monitoring of this issue, it is important to develop a proper priority setting process by which targets are brought on-line within our analytical monitoring programs. CEC monitoring requires significant analytical support and technical expertise using highly sensitive analytical systems such as LC/MS/MS, IC/MS, and GC/MS/MS, and an enhanced target selection process is needed to effectively keep analytical resources properly addressed.
3-72
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
RESEARCH AND DEVELOPMENT
Summary Information
Existing Staff – 7 FTEs
1 – Research Director
2 – Principal Scientist
1 – Senior Operator
1 – Senior Scientist
1 – Scientist/Process Specialist
1 – Scientist
Mission
Conduct applied research that supports the District’s operational, regulatory, and water quality objectives through innovation, technology evaluation, development of new or improved processes and methods, and collaboration with universities and topic experts.
Key Issues for FY 2020-21
♦ Evaluate treatment technologies for removal of per- and polyfluorinated alkyl substances (PFAS) from groundwater and consider other related PFAS research studies.
♦ In cooperation with Water Production staff, continue research into microfiltration/ultrafiltration (MF/UF), reverse osmosis (RO), and ultraviolet (UV)/advanced oxidation process (AOP) issues at the Advanced Water
3-73
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
Purification Facility (AWPF) that affect the Groundwater Replenishment System’s (GWRS) efficiency to help manage GWRS operation and maintenance (O&M) costs and enhance water quality.
♦ Work with the Planning and Forebay Operations departments to improve percolation efficiency and manage O&M costs, including field sampling and laboratory support.
♦ Conduct new grant-support studies to determine if additional GWRS virus pathogen log removal credits can be documented for both the OCSD wastewater treatment process and the GWRS reverse osmosis process integrity in support of GWRS Final Expansion permitting.
♦ Continue to address focus areas presented to, and supported by, the GWRS Independent Advisory Panel (IAP) regarding minimization of N-nitrosodimethylamine (NDMA) reformation post-UV/H2O2 AOP and incorporation of Next Generation Sequencing into the microbial water quality R&D program.
♦ Continue to seek collaborative partnerships with other research groups (academic and industrial) and funding agencies capable of expanding the scope of groundwater recharge and advanced water treatment research at OCWD.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 1,068,295 1,530,590 1,265,585Services and Supplies 306,875 237,490 294,644
Total $1,375,170 $1,768,080 $1,560,229
I FY 2020-21 Major New Initiatives/Programs
♦ R&D will provide pilot oversight and sampling support for treatment technology evaluation for PFAS.
♦ A new grant-funded study will evaluate alternative disinfectants for fouling control of MF and RO membranes.
♦ R&D will develop in-house methods for evaluation of the microbial community of GWRS through different treatment stages, building on prior metagenomics work.
♦ R&D will continue increased outreach and publication of R&D work, including for the public, as suggested by the Board of Directors, in collaboration with Public Affairs, and initiated in FY2018-19.
II Core Activities
♦ Solve problems and research promising technologies to improve water quality and to increase the efficiency of District water treatment and recharge operations.
3-74
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Provide scientific and technical support to GWRS treatment processes, recharge, and injection.
♦ Provide support and implementation of strategies to improve percolation for groundwater recharge for both GWRS and Santa Ana River (SAR) flows and increase capture and recharge of SAR flows via more efficient recharge practices.
♦ Report research progress internally via inter-departmental communications and reports, and via participation in the Recharge Enhancement Working Group (REWG).
♦ Develop and evaluate new analytical methods for detecting contaminants and pathogens.
♦ Seek external funding.
♦ Publish and present research findings.
♦ Continue Postdoctoral Research Program, which began with the first hire of Postdoctoral Research Associate in FY 2016-17, to conduct research that supports the District’s core objectives.
III Non-Core Activities
♦ Participate in scientific advisory panels/research advisory boards/research project advisory committees (PACs).
♦ Provide consulting information to other water agencies, utilities, and regulatory agencies.
IV Group Goals for FY 2020-21
GRANT FUNDED RESEARCH:
R&D continually seeks external research funding from various organizations. Typically, seeking external funding for R&D activities benefits from partnering with groups such as universities, engineering consulting firms, or technology providers to develop proposals for solicited or unsolicited research.
For FY 2020-21, the following projects are funded wholly or partially funded through external grants, including funding for OCWD labor and/or equipment/supplies:
♦ Evaluating Post-Treatment Challenges for Potable Reuse Applications, funded by WRF (9998) [2016 to 2019] – This project was completed with a final report issued in FY 2019-20. However, in FY 2020-21, staff will complete journal publications. The study investigated post-treatment optimization at AWPF, to balance competing goals of maintaining pipeline integrity while minimizing NDMA reformation and aquifer recharge metals mobilization. The project team consisted of OCWD, Trussell Technologies, and Stanford University, together with several participating utilities that contributed cash funding.
3-75
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Understanding Formation of a Critical Disinfection Byproduct: NDMA and Previously Unidentified NDMA Precursors in Advanced Potable Reuse Treatment Plants, funded by USBR (1782) [2018 to 2020] – This project was funded by USBR for a 2-year study beginning January 1, 2018, to be completed in FY 2019-20, however in FY 2020-21 staff will develop journal publications. For this study, R&D investigated the occurrence and removal of NDMA precursors at AWPF as well as conducted high-frequency monitoring of NDMA to determine diurnal, temporal and seasonal trends in NDMA occurrence. Additionally, R&D partnered with San Diego State University, University of Nevada-Reno and the University of Colorado-Boulder to complete non-targeted analysis of AWPF waters to aid in the understanding of NDMA appearance post-treatment.
♦ Increasing Potable Water Recovery to >95%: Pilot Evaluation of Closed Circuit Desalination (CCD) and Forward Osmosis (FO) Alternatives for
Concentrate Treatment, funded by USBR (1781) [2017 to 2019] – This project was funded by USBR for a fifteen-month study (1.25 year) beginning June 2018 to be completed in FY 2019-20, however, in FY 2020-21 staff will develop journal publications. The objective of this study was to evaluate two treatment technologies – closed-circuit desalination (CCD) and forward osmosis (FO) – at a pilot scale to recover water from RO concentrate generated from AWPF, minimizing the volume of the waste stream while generating more water. The goal was to increase overall facility water recovery (plant efficiency) from 85% to 90-95%. The study focused on comprehensive water quality testing, determination of virus log removal, confirmation of suitability for subsequent UV/AOP treatment, and cost analysis.
♦ Novel Online Surrogates to Monitor Reverse Osmosis Performance in Reuse Applications, Funded by USBR and MWD (1801) [2019-2021] – This project was funded by USBR and the Metropolitan Water District for an eighteen-month study (1.5 years) beginning July 2019 and is a collaboration with Trussell Technologies. RO provides a barrier to salts, dissolved chemicals, particles, and microorganisms. There is no integrity monitoring online methods for RO systems that directly demonstrate microbial removal. The true barrier power of the RO is not recognized by the regulatory agencies, often only ≤ 2 log removal credits (LRVs) are granted, based on currently available methods for integrity monitoring. The objective of this study is to evaluate four novel surrogates and their online monitoring capabilities under full-scale and long-term conditions to increase awarded pathogen LRVs, and compare to facility LRVs calculated from the online conductivity and TOC data that are currently used by OCWD for obtaining regulatory pathogen removal credits for the AWPF RO process.
3-76
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Innovative Water Reuse Systems Harnessing Chloramine Photochemistry for Potable Water Reuse, funded by U.S. Bureau of Reclamation (USBR) (1781) [2019 to 2020] – This University of California Riverside (UCR)-led project is funded by USBR for two years beginning in 2020 in collaboration with OCWD.The objective of this study is to pilot-test a novel ultraviolet-driven advanced oxidation process (UV-AOP) using chloramines for reclaiming potable-quality water from wastewater effluent. Specifically, the focus is to test the viability and determine the optimum conditions of operation of a chloramine-based UV-AOP in a water reuse treatment train and its economic effectiveness.
♦ Determination of Enteric Virus Log Reduction Values (LRVs) from Orange County Sanitation District Plant No. 1 and No. 2 (9922) [2018 to 2022] – With partial funding from Metropolitan Water District through the Future Supply Actions program and The Water Research Foundation, and with assistance from the Water Quality Department and the Orange County Sanitation District (OCSD), R&D is evaluating the OCSD’s Plant No. 1 and Plant No. 2 facilities for enteric virus concentrations in raw wastewater and secondary treated effluents. The purpose is to determine virus log removal values (LRVs) to potentially be applied toward the AWPF regulatory requirements for virus removal (a minimum of 12 logs of virus removal required from raw OCSD influent to potable well extraction).
♦ Evaluation of Alternative Disinfectants for Biofouling Control of UF and RO Membranes as a Non-Toxic Alternative to Chlorine (1916) [2020-2022] – This project is funded by the USBR for 24 months (2 years), with the contract (official start date) expected early 2020. The current method to control biofouling for membrane systems treating municipal wastewater has been the addition of sodium hypochlorite to the feedwater to form chloramines, but this forms disinfection by-products (DBPs). The goal of this project is to evaluate an alternative disinfectant and fouling control agent for both UF and RO that produces less DBPs.
♦ New Technologies, Tools, and Validation Protocols for Achieving Log Removal Credit across NF and RO Membranes (WRF) (1917) [2020-2021] –This project is funded by WRF (WRF project no. 4958) for a two-year study to evaluate methods for demonstrating RO membrane integrity. The project lead is Carollo, with project team members including SPI, Colorado School of Mines, and Southern Nevada Water Authority. The District is participating both as a project team member completed research tasks as well as a host site for two technologies that will be evaluated, which are a marker-based approach and SPI’s novel “dilution model” statistical method of analyzing conductivity data from various RO trains to isolate diffusion from defect-related conductivity passage.
3-77
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Restoration of Local Recharge Sources from Invasive Dreissenid Mussels, Funded by Metropolitan Water District (MWD) (9920) [2020-2021] –This project is funded by MWD for a two-year study that began mid-2019. The spread of quagga mussels, an invasive mollusk, in imported water is a barrier to the efficient use of imported and stormwater supplies for groundwater replenishment. The objective of this study is to evaluate a potential treatment method to eradicate quagga mussel infestation and prevent potential spreading using an EPA-registered molluscicide, Earthtec QZ. OCWD’s Planning department is leading this study with the support of Trussell Technologies, Inc. and KASF Consulting, which specializes in quagga mussel sampling, identification, and testing. Quagga-veliger dose-response testing is proposed at OCWD’s Forebay facility (OC-28 turnout at Anaheim Lake) and 4 other locations offsite. FRL staff is providing project management support, technical review, and sampling support as needed. In FY 2020-21, the overall data collection and compilation will be completed and a technical memorandum completed in February 2021.
Other Research:
The projects below are funded by OCWD. For some projects consisting of collaboration between OCWD R&D Department staff and a university or technology partner, the project partner may have grant funding, or OCWD may be providing funding to the partner to support the research. This is indicated in the summaries below, where applicable.
AWPF Process Optimization (9952):
♦ Task 1: AWPF Support – R&D will continue to engage in short-term research activities on an ad-hoc basis to assist the Water Production and Engineering Departments in solving problems arising during operation of the AWPF. Examples of applied research under this activity have included:
o Assisting Engineering and Water Production staff to determine mechanisms and solutions for GWRS Pipeline and Barrier Pipeline lining erosion.
o Autopsy (microbial and chemical analysis) of fouled MF and RO membranes from the AWPF and ERC.
o Advisory support and equipment for controls and sampling apparatus for ongoing AWPF RO phage monitoring.
o Annual reports and presentations to the NWRI Independent Advisory Panel (IAP) regarding GWRS performance.
♦ Task 2: MF/UF Performance/Fouling Research – R&D research related to MF/UF performance is currently grant-funded (Evaluation of Alternative Disinfectants for Biofouling Control) and therefore described in the previous section.
3-78
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Task 3: RO Performance/Fouling Research – In addition to ERC pilot studies related to RO (see next section), R&D will conduct investigations of RO fouling aimed at:
o Antiscalant evaluation and dose optimization using a real-time membrane scale monitor (MeMo) [2018 to 2020] – The 12-month project was extended to approximately two years. The goal is to 1) demonstrate the application of Noria Water’s real-time membrane monitor (MeMo) to improve OCWD’s existing RO Pretreatment Chemical Program (pilot test) via determining the minimum dose of a given antiscalant for effective suppression of membrane scaling/fouling; as well as 2) to demonstrate its use in the RO plant (full-scale test). The MeMo system is based on a patented UCLA technology to provide direct membrane surface imaging and allow quantification of mineral scaling/fouling and crystal growth kinetics. This study will demonstrate the application of MeMo for real-time membrane surface scale monitoring on the concentrate line of a full-scale RO unit at OCWD.
♦ Task 4: Advanced Oxidation Process (AOP) Studies – R&D will continue research aimed at characterizing the chemical dynamics of the GWRS UV/H2O2 process and optimizing the performance of the Trojan Technologies UVPhox reactor train through analysis of water quality, system operational parameters and UV pilot reactor studies. Planned studies include:
o H2O2/Chloramine Matrix Pilot Studies [~2008 to present] – During UV-AOP treatment, UV irradiation and HO∙ radicals derived from hydrogen peroxide (H2O2) are not solely responsible for bringing about oxidation; combined chlorine species (mono- and di-chloramine) present in the UV-AOP feed water may also play a significant role. R&D will continue to investigate the removal of 1,4-dioxane and additionally acetone and tert-butyl alcohol (TBA) at varying H2O2 and combined chlorine levels utilizing the onsite UV-AOP pilot reactor. For FY 2020-21, studies will focus on identifying the conditions for which optimal 1,4-dioxane removal occurs, based on past data suggesting synergistic effects of chloramine and H2O2. A portion of this work will be conducted in collaboration with Professor Haizhou Liu in the Chemical and Environmental Engineering Department at the University of California, Riverside (UCR) through a USBR grant to UCR, listed in the previous section.
o Experimental Investigation of Chloramine and Persulfate Aqueous Photochemistry and Development of Efficient UV-Based Water Reuse Treatment [2016 to 2019] – This is an NSF-GOALI project in collaboration with Professor Liu at UCR, with NSF funding to UCR. This work will elucidate the UV-driven AOP of trace organic contaminants in RO permeate based on two oxidants: chloramine and persulfate. Persulfate could be used as a novel oxidant due to its high
3-79
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
yield of sulfate radicals and conversion to hydroxyl radicals, to maximize contaminant degradation and minimize the energy footprint of AOP water treatment. Dr. Liu was awarded a 3-year $330,000 grant from NSF, and OCWD is an industrial partner. The project started in 2016; however, UCR requested and received a no-cost extension until August 31, 2020.
♦ Task 5: Water Quality Characterization at AWPF – Planned studies related to water quality characterization include:
o Characterization of Microbial Communities at AWPF [2020 to 2021] – R&D staff will evaluate the application of new methods for characterizing and quantifying the occurrence of different microbial targets (e.g., bacteria, protozoa) that make up the microbial community of GWRS through different treatment stages. This effort will build on prior grant-funded studies, utilize new equipment and techniques, and address NWRI IAP encouragement to evaluate the metagenome of GWRS microbial communities. Funds may be utilized to support university collaboration with researchers at the University of Southern California (USC).
♦ Task 6: Treatment and Recovery of Water from RO Concentrate – Planned studies related to RO concentrate include:
o Water Recovery from RO Concentrate via CCD and FO – See Task 4 in the next section (ERC) for Phase I testing and see earlier section on grant-funded projects for Phase II testing.
ENGINEERING RESEARCH CENTER (9952):
Projects conducted at the ERC are summarized below. These projects are all pilot-scale evaluations that tend to be very applied and/or focused on the demonstration of available technology or product. A list of equipment and systems supporting these activities is also presented in Table 1.
♦ Task 1: Antiscalant Testing Program [2008 to present] – The GWRS RO system requires specialty chemicals, including antiscalant and acid, to prevent the precipitation of sparingly soluble minerals which scale the membranes. R&D will continue pilot-scale testing of selected antiscalant products at the ERC, as well as monitoring performance using three systems (B01, B02, and A01 3rd Stage Monitoring Vessels) currently operating within the GWRS AWPF RO facility.
♦ Task 2: RO Membrane Procurement Program [2009 to present] – Commercial RO membrane products continue to be developed, which pose the potential for significant benefits in enhanced permeability and rejection. Products are evaluated by R&D through long-term testing using a series of
3-80
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
eight tests “satellite” vessels located in the GWRS RO facility. Products deemed successful are short-listed for future membrane procurements. Based on the current GWRS RO membrane lifespans and procurement schedule, no new product acquisitions are required for the next several years; thus, no or only limited RO product testing is anticipated during FY 2020-21.
♦ Task 3: Water Recovery from RO Concentrate [2014 to 2020] – The most recent phase of this project is grant-funded and therefore described in an earlier section of this work plan. The project on CCRO and FO-RO will be completed by FY 2020-21 except for R&D staff development of journal publications.
Table 1. Summary of Pilot Testing at ERC / AWPF
Pilot Equipment FY 2019-20 FY 2020-21
Evoqua submerged, “next-generation” PVDF MF/UF pilot #1
GWRSFE Performance Test
and Alternate Biocide Research Study
Alternative Disinfectants Research Study (USBR)
Evoqua submerged, “next-generation” PVDF MF/UF pilot #2
GWRSFE Performance Test
and Alternate Biocide Research Study
Alternative Disinfectants Research Study (USBR)
RO pilot unit #1 Antiscalant evaluations Antiscalant evaluations
RO pilot unit #2 Antiscalant evaluation/ MeMo research study
Antiscalant evaluations
RO pilot unit #3 Alternative Disinfectants Research Study (USBR)
Alternative Disinfectants Research Study (USBR)
GWRS 3rd-stage monitoring vessels (A01, B01, B02)
Ongoing Monitoring Ongoing Monitoring
GWRS RO satellite vessels (A01, A02, B01, B02, C01, C02, D01, D02)
Performance Test (various RO membrane products)
Long term performance Test
TALBERT BARRIER O&M (9908):
♦ Injection Well Fouling and Pipeline Integrity Issues – R&D staff will continue to provide ad hoc support for Barrier Operations, including microscopic, biological, and biochemical analysis, as well as numerical analysis of field or operational performance data as necessary. This includes assisting Water Production/Barrier staff in evaluating and monitoring particle sloughing in the GWRS Pipeline and Barrier Pipeline and assisting Water Production/Barrier staff in evaluating the effect of Mid Basin Injection Well (MBI) fouling as the function of particle sloughing from the GWRS Pipeline.
3-81
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
FOREBAY O&M (9920):
♦ Task 1: PFAS Treatment Technology Pilot System Support [2019 to 2021] – Per- and polyfluoroalkyl substances (PFAS) have been found in several groundwater drinking water wells within the Orange County Basin. The District has initiated a pilot test to evaluate granular activated carbon (GAC), ion exchange resins (IX), and novel adsorbents as a treatment remedy. An Evoqua pilot system was installed to treat water from the District’s Bessie well located immediately adjacent to Warner Basin, using GAC and IX from several different manufacturers. In FY 2020-21, R&D will continue providing pilot oversight and sampling support, in coordination with the Water Quality Department, Engineering Department, and consulting engineering firm Jacobs.
♦ Task 2: Desilting Demonstration Project Phase III Support [2013 to present] – Led by the Planning Department, this project assesses the field-scale performance of a subsurface passive collection unit (riverbed filtration system) placed below the off-river facilities to desilt Santa Ana River (SAR) water and provide this as recharge water to Olive Basin. In FY 2018-19, a new pilot collector unit was installed below the live river system to assess performance in high-flow conditions with higher suspended solids loading. Field Research Laboratory (FRL) staff provides support to this project in the form of water sample collection and analyses (total suspended solids [TSS], turbidity, and temperature). Staff also conducts hydraulic testing to compare performance by changing experiment configurations (opening and closing of lateral valves to watch performance comparison).
GWR SYSTEM O&M (9922):
♦ Task 1: Soil Column Test of GWRS FPW Clogging Associated with Epoxy-Coated Pipeline [2018 to present] – The GWRS Unit 1 pipeline between AWPF and MBI-1 site, which delivers GWRS water to the MBI-1 injection well, was epoxy coated in October 2018. R&D initiated a soil column study in FY 2018-19 to compare percolation rates before and after pipeline epoxy-coating. Data collection will be completed soon with publication development planned in FY 2020-21.
♦ Task 2: La Palma Basin Percolation Rate Monitoring Using Fiber Optic Distributed Temperature Sensing (FODTS) [2016 to 2020] – R&D collaborated with California State University, Long Beach (CSULB) to install a FODTS system to monitor spatially distributed percolation rates at La Palma Basin using heat as a tracer of infiltration. By tracking spatial and temporal variations of infiltration across the basin, FODTS can reveal specific areas where clogging occurs and help optimize operations by improving cleaning strategies to enhance long-term basin performance. In FY 2020-21, R&D will continue collecting, processing, and interpreting data and will develop scientific journal publications.
3-82
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Task 3: Removal of Microbial Indicators by Soil Aquifer Treatment During GWRS Recharge [2020 to 2022] – R&D will complete a project to measure target pathogen removal during groundwater recharge, i.e. removal via soil aquifer treatment. The long term objective is to determine virus log removal values (LRVs) to potentially be applied toward the AWPF regulatory requirements for virus removal (a minimum of 12 logs of virus removal required from raw OCSD influent to potable well extraction). Funds may be utilized as needed to support researcher collaboration from universities or engineering firms.
PRADO WETLANDS SUPPORT (9983):
♦ Task 1: Prado Wetland Research on Biobarriers [2017 to 2020] – In this study, funded by the National Institutes for Water Resources/United States Geological Survey (NIWR/USGS), OCWD is collaborating with Colorado School of Mines (CSM) to investigate the enhancement of nitrate attenuation in seven parallel shallow open water treatment wetlands. This effort follows upon the Prado Open Water Unit Process (POWUP) Wetlands project carried out with collaborators from CSM and the larger ReNUWIt National Science Foundation ERC. The objectives are to reduce the design footprint and increase the reliability of the engineered wetland by enhancing biological contaminant transformation via passive hydrologic manipulation utilizing microbially active treatment “biobarriers.” Field-scale system construction is completed, and assessment of nitrogen fate and transport and quantification of microbial processes is ongoing. OCWD has provided in-kind support for construction costs, operation and maintenance, and limited data coordination and analyses. R&D will continue providing support for planning and field monitoring as needed in FY 2020-21.
COLLABORATIVE STUDIES AS PARTICIPATING UTILITY:
OCWD regularly participates in collaborative research with universities and other partners, often facilitated by R&D staff, in which OCWD provides water samples, data, operating history, and other support as an in-kind contribution to a partner-led study. Planned projects of this nature in FY 2020-21 include the following, with the prime OCWD point of contact listed:
The Water Research Foundation
♦ Indicator Viruses to Confirm Performance of Advanced Physical Treatment, WRF 4955 (Megan Plumlee).
♦ Considerations and Blending Strategies for Drinking Water System Integration with Alternative Water Supplies, WRF 4953.
3-83
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Critical Evaluation and Assessment of Health and Environmental Risks from Antibiotic Resistance in Reuse and Wastewater (White Paper), WRF 4813 (Megan Plumlee).
♦ Integrating Management of Sensor Data for a Real-Time Decision Making/Response System, WRRF 14-01 (Mehul Patel).
♦ Performance/Cost Review of Existing Desalination Plants that use Conventional/Membrane Pretreatment Prior to Reverse Osmosis, WRRF 14-07 (Mehul Patel).
♦ Optimization of Ozone-BAC Treatment Processes for Potable Reuse Applications, WRRF 15-10 (Mehul Patel).
♦ Low Molecular Weight Unknown Compounds, WRF DPR-5 (Megan Plumlee).
National Science Foundation (NSF)
♦ The University of Illinois at Urbana-Champaign, Prof. Roland Cusick, to establish a dynamic RO model to estimate the demand GWRS could take to grid ancillary market run by the California Independent System Operator (CAISO) based on past GWRS RO unit membrane performance data (Han Gu).
Department of Energy (DOE)
♦ National Alliance for Water Innovation (NAWI), Energy-Water Desalination Hub led by Lawrence Berkeley National Laboratory, in which OCWD will serve as a participating utility member.
U.S. Centers for Disease Control and Prevention (CDC)
♦ District participation in UC Irvine-led study regarding PFAS in drinking water in Orange County, ‘Multi-Site Study of the Health Implications of Exposure to PFAS-Contaminated Drinking Water Department of Health and Human Services.’
PARTICIPATION IN PACS AND ADVISORY COMMITTEES:
For FY 2020-21, planned advisory activities include:
♦ Water UCI Industry-University Cooperative Research Center (IUCRC), District serving as member of the Industrial Advisory Board, $50,000 annual funding to UCI (Megan Plumlee).
♦ The occurrence of PFAS Compounds in U.S. Wastewater Treatment Plants, WRF 5031 (Megan Plumlee).
3-84
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
♦ Nontarget Chemical Analysis of California Drinking Water to Detect and Identify Potential Contributors to Breast Cancer, California Breast Cancer Research Program (Megan Plumlee)
♦ Building-Scale Treatment for Direct Potable Water Reuse & Intelligent Control for Real-Time Performance Monitoring, WRF 4691/TC-16-007 (Megan Plumlee).
♦ Integration of High-Frequency Performance Data for Microbial and Chemical Compounds Control in Potable Reuse Treatment Systems, WRF 4954 (Mehul Patel).
♦ Understanding the Impacts of Wastewater Treatment Performance on Advanced Water Treatment Processes and Finished Water Quality, WRF 17-05 / 4833 (Mehul Patel).
♦ Treatment for Averaging Potential Chemical Peaks, WRF DPR-4 (Megan Plumlee – Technical Working Group; Mehul Patel – PAC).
V Pending Activities
♦ RO Pilot Testing at OCSD Plant No. 2 to Support GWRS Final Expansion – In cooperation with Water Production staff, R&D may conduct a pilot evaluation of RO performance at OCSD Plant No. 2. Plant No. 2 effluent will be source water for the GWRS Final Expansion (blended with Plant No. 1 effluent). Pilot evaluations for MF and UF products have been ongoing at the ERC and OCSD Plant No. 2. Extending this testing to RO would provide an indication of expected permeate water quality.
♦ Evaluation of UV/HOCl AOP Utilizing Trojan’s (4-Lamp) Pilot UV Reactor – In February 2019, Trojan scientists conducted pilot studies on UV/HOCl and UV/H2O2 operating using RO permeate from OCWD’s AWPF. Trojan requested that the pilot reactor remains at OCWD so that more studies can be conducted in the future.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
The purpose of this section is to list future issues, developments, and opportunities related to the District’s objectives that may affect R&D or where R&D may contribute.
♦ Applied research opportunities at the Engineering Research Center –Opportunities for future pilot testing, whether located at the Engineering
3-85
RESEARCH AND DEVELOPMENT
Orange County Water District FY 2020-21 Work Plan
Research Center or elsewhere on-site, to identify new technologies and operational strategies for the AWPF include:
o Next-generation MF and RO membranes for the AWPF.
o New chemical treatment techniques capable of enhancing MF and RO effectiveness and reducing operating costs.
o Sensing methodologies capable of real-time or near-real-time assessment of the RO and AOP barriers to contaminants of public health concern.
o Technologies for enhancing water recovery.
o New or improved AOP methodologies (e.g., chlorine AOP, catalytic AOPs).
o Treatment of RO concentrate for the destruction of trace organics or improved performance of concentrate water recovery technologies.
♦ Evaluation of new methodologies capable of enhancing recharge efficiency, or studies of recharge impacts, such as:
o Use of FODTS to provide a basin management benefit based on the outcome of the current FODTS study.
o Additional column studies, building on previous findings, to understand and minimize clogging in recharge systems that are fed AWPF FPW or other water supplies.
o Long-term effects of AWPF FPW recharge on the groundwater basin.
♦ Evaluation of new and novel methods of measuring water quality, including:
o Molecular biological methodologies for virus and bacterial pathogen detection and identification, such as Droplet Digital PCR for organisms of interest related to AWPF or of public health concern.
o New real-time detection methodologies for biological and chemical species of public health concern.
o Bioassays to assess toxicity and other specific biological responses.
♦ Studies to optimize current treatment practices or to develop more efficient processes for the treatment of per- and polyfluoroalkyl substances (PFAS), including perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS).
3-86
HYDROGEOLOGY
Orange County Water District FY 2020-21 Work Plan
HYDROGEOLOGY
Summary Information
Existing Staff - 13.5 FTE
1 – Chief Hydrogeologist
1 – Principal Engineer
2 – Principal Hydrogeologists
2 – Senior Hydrogeologists
2 – Hydrogeologists
1 – GIS/Database Supervisor
2 – Senior GIS Analysts
1 – Environmental Specialist/Data Analyst
1 – Maintenance Technician
0.5 – Administrative Support Specialist (shared with Regulatory Affairs)
Mission
Define the physical characteristics of basin aquifers, determine groundwater flow pathways, and provide analyses and recommendations necessary to manage groundwater production, recharge, groundwater quality protection and remediation, seawater intrusion, and water levels within the basin.
3-87
HYDROGEOLOGY
Orange County Water District FY 2020-21 Work Plan
Key issues for FY 2020-21
Using the expanded groundwater model, prepare a proposed plan to control seawater intrusion in the Sunset Gap, including proposed locations, number, and estimated flow rates of injection and extraction wells.
Under USEPA oversight, complete the remedial investigation report and perform a feasibility study of remedial alternatives to address groundwater contamination in the North Basin area.
Complete the remedial investigation and feasibility study to identify a recommended interim remedial approach to address groundwater contamination in the South Basin area.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 2,123,490 2,178,164 2,217,122Services and Supplies 14,047,336 2,170,900 1,948,400
Total $16,170,826 $4,349,064 $4,165,522
I FY 2020-21 Major New Initiatives/Programs
Develop a proposed plan to control seawater intrusion in the Sunset Gap, including the construction of five monitoring wells to delineate the downgradient extent of the intrusion.
With Board approval, pursue implementation of an early action to contain and remove contaminated groundwater in the South Basin area.
II Core Activities
The objectives of the Hydrogeology group are to define the physical and chemical characteristics of basin aquifers, determine groundwater flow pathways, and provide analyses and recommendations necessary to manage groundwater production, recharge, quality, and water levels within the basin. Core functions include:
Basin-wide water level monitoring program of over 200 wells and trend analysis. These data are used for numerous applications, including the annual calculation of basin storage in support of the Annual Engineer’s Report and compliance with state SGMA and CASGEM programs.
Refinement and operation of the basin groundwater flow model used to evaluate the effects of basin management alternatives, proposed well fields, recharge projects, and pumping variations.
Evaluation of the Talbert and Alamitos seawater barriers’ performance.
Evaluation of seawater intrusion in the Bolsa and Sunset gaps.
3-88
HYDROGEOLOGY
Orange County Water District FY 2020-21 Work Plan
Enhancement and maintenance of the Water Resources Management System (WRMS) database and geographic information system (GIS).
GIS map production and database support for projects, planning, reports, and presentations.
Technical support and assistance for the groundwater producers.
Preparation of the monthly Water Resources and annual Santa Ana River Watermaster reports. Funds for contracting with the U.S. Geological Survey to collect SAR flow measurements are budgeted annually. These measurements are essential for the preparation of the Watermaster reports, storage operations at Prado Dam, and calculation of recharge volumes.
Participate in Santa Ana River Watermaster meetings, including determination of annual Santa Ana River base flow and storm flow.
Review and evaluation of site-specific groundwater contamination investigations and cleanups overseen by regulatory agencies.
Hydrogeologic analysis of recharge project feasibility studies.
Evaluation of RA/BEA exemption requests.
III Non-Core Activities
None
IV Group Goals for FY 2020-21
The following programs are highlighted as major activities encompassed within or in addition to the core group activities listed above:
Sunset Gap Seawater Intrusion – Develop a recommended plan to control seawater intrusion in the Sunset Gap, including the construction of five monitoring wells to delineate the downgradient extent of the intrusion.
North Basin Groundwater Protection Project – Complete the remedial investigation report and initiate the feasibility study of remedial alternatives to address VOC contamination under USEPA oversight. Monitor the performance of extraction well EW-1 activated in 2017 to reduce the spread of VOCs.
South Basin Groundwater Protection Project – Complete the remedial investigation and feasibility study to identify a recommended interim remedial approach to address VOC and perchlorate contamination.
Monitoring Well Replacement – Construct one seawater intrusion monitoring well in the Talbert Gap to replace a 57-year old well that is corroded and needs to be destroyed and sealed.
East Newport Mesa Hydrogeologic Investigation – Construct depth-specif monitoring wells at one location to investigate a potential pathway for brackish groundwater to flow into the principal aquifer at the southern margin of the groundwater basin.
3-89
HYDROGEOLOGY
Orange County Water District FY 2020-21 Work Plan
Mid-Basin Injection Wells – Evaluate the performance of four recently-constructed mid-basin injection wells in Santa Ana’s Centennial Park.
Talbert Extraction Well Decommissioning – Decommission (demolish, backfill, and seal with cement grout) seven inactive extraction wells. Engineering is managing the demolition and backfilling of the vaults and pipelines. Work began in FY19-20 and will extend into FY20-21.
Water Resources Management System (WRMS) – Continue streamlining water level, water quality, and groundwater production data processes, including the development of tablet data collection applications for field staff. Develop additional tools for data display and retrieval, e.g., data and graphs from the Water Resources and Watermaster report.
Alamitos Gap Seawater Intrusion – Evaluate the performance of 17 new Alamitos Barrier injection wells that became operational in September 2018.
Santa Ana Riverbed Recharge Evaluation – Assist Planning and Recharge departments in the subsurface characterization of riverbed above Imperial Highway as a potential infiltration system location, including piezometer installations.
Prado Basin Groundwater Characterization – Several monitoring wells are planned for construction for two purposes: 1) assess changes in depth to groundwater as it affects riparian vegetation and 2) assess the occurrence of PFAS compounds as rising groundwater can contribute to surface water concentrations in the Santa Ana River.
Litigation Support – Provide support as needed for the North Basin, and South Basin, and MTBE cost recovery actions.
Basin Model Extended Calibration – Complete recalibrating the basin-wide groundwater flow model through 2018, including revising recharge inputs, hydraulic conductivity, and storage coefficient to better represent historical water levels. The basin model is OCWD’s main analytical tool to simulate potential groundwater level changes and flow paths associated with proposed or conceptual future recharge or pumping projects.
V Pending Activities
None
VI Staff Additions for FY 2020-21
None
VII Future Issues
In the next two to three years, issues involving the Hydrogeology group that the District will need to consider include:
Implementation of a seawater intrusion control project in Sunset Gap will require coordination with the Naval Weapons Station, Regional Water Quality
3-90
HYDROGEOLOGY
Orange County Water District FY 2020-21 Work Plan
Control Board, and other entities involved with nearby groundwater remediation activities.
Replacement of 2-3 Talbert Barrier injection wells that have exceeded their useful life.
Coordination with USEPA and stakeholders to complete the remedial investigation/feasibility study to develop remedial measures for the North Basin groundwater contamination.
Coordination with state regulatory agencies and stakeholders on remedial alternatives for the South Basin groundwater contamination.
Continued maintenance and evaluation of aging monitoring well network, including plans for well refurbishment and replacement as necessary.
3-91
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
REGULATORY AFFAIRS
Summary Information
Existing Staff – 2.5 FTE
1 – Executive Director of Water Quality and Technical Resources
1 – Principal Health & Regulatory Specialist
0.5 Administrative Support Specialist (shared with Hydrogeology)
Mission
Help to assure reasonable regulation of District projects and programs through the interface with regulatory agencies, acquisition of necessary permits, and implementation of water quality monitoring and research programs to support district goals and compliance with current and anticipated future water quality regulations. Collectively oversee the Water Quality, Laboratory, and Research & Development Departments.
Key issues for FY 2020-21
Assist Groundwater Producers with per- and polyfluroroalkyl substances (PFAS) impacted wells/sources, monitoring regulatory compliance, permitting of treatments systems, including leading Producer PFAS Workgroup; review and comment on forthcoming state Public Health Goals (PHGs) and any future Notification and Response Levels for PFAS; serve as primary stakeholder participant in reconstituted SAWPA Emerging Constituents Task Force to help characterize PFAS sources to SAR watershed; continue working with Hydrogeology, Water Quality and Laboratory departments to characterize the extent of PFAS local groundwater and the SAR, to determine potential sources, following up with regulators as needed.
3-92
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
Continue regulatory permitting activities and related studies (i.e., groundwater modeling, tracer test planning, LRV studies) to expand permitted GWRS recharge areas (e.g., lower SAR, Burris Basin, Santiago Basin, etc.) to help accommodate GWRS Final Expansion flows.
Coordinate the preparation and submittal of the calendar year 2019 Groundwater Replenishment System (GWRS) Annual Report and next to Santa Ana River (SAR) Water Quality Report.
Lead preparations for the 2020 annual meetings of the NWRI Independent Advisory Panels for the GWRS and SAR Monitoring (SARMON).
Review, analyze, and submit tracer test results from MBI Centennial Park project startup.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 596,150 313,031 478,158Services and Supplies 139,391 233,300 296,700
Total $735,541 $546,331 $774,858
I FY 2020-21 Major New Initiatives/Programs
Support of PFAS Response Program Policy with Producers, including expanded laboratory testing capacity, providing review and comment on PHGs for PFOA and PFOS, any additional Notification and Response Levels, and supporting the implementation of wellhead treatment
Coordination with UC-Irvine research team leading federal Centers for Disease Control (CDC) funded PFAS retrospective epidemiological study planned for select Orange County communities
Complete Title 22 Engineering Report for GWRS Final Expansion, including the required assessment of new recharge locations.
Fulfillment of new state-mandated bioanalytical monitoring for GWRS under required Quality Assurance Project Plan (QAPP)
In cooperation with the Engineering Department, implement county-wide standardized procedures for receiving required OCHCA and DDW approval of new end-users and for required regular site inspections for established use sites.
II Core Activities
The Regulatory Affairs Department is primarily responsible for the District’s permits with the RWQCB, DDW, and the Orange County Health Care Agency (OCHCA) and assuring compliance with all monitoring and quality requirements.
Core activities include:
3-93
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
Manage Water Quality and Technology Group, which includes the Laboratory, Water Quality, Regulatory Affairs, and Research & Development.
Obtain permits and negotiate conditions for District projects and facilities from health and regulatory agencies; RWQCB, DDW, OCHCA.
Assure compliance with permit conditions, including monitoring and reporting to regulatory agencies.
Facilitate regular coordination between Water Quality and Technology Group departments and newly reorganized OCSD Division of Environmental Services, which includes OCSD Laboratory, Ocean Monitoring, Environmental Compliance, and Source Control staff, with emphasis on identifying compounds of concern for regulation by the GWRS Source Control Program, including testing needs and concentration limits.
Coordinate with OCWD and OCSD Operations staff to improve understanding of links between secondary treatment and GWRS product water quality.
Help manage and coordinate OCWD participation in external research projects with funding support, in-kind contributions, the provision of providing water quality samples and historical data, and the review of draft reports.
Continue to support Planning and Engineering Departments with water quality and permitting needs for future GWRS recharge and injection facilities.
Coordinate with NWRI on the management of Independent Advisory Panels (IAP) appointed for GWRS and SAR monitoring.
Evaluate recommendations from the NWRI GWRS IAP and prioritize implementation.
Review sampling and analysis program results for the Santa Ana River and follow up on recommendations from the SARWQH Study and the SARMON NWRI IAP.
Serve as primary liaison with the SAWPA Emerging Constituents Workgroup.
Participate in the optimization process for GWRS to improve treatment efficiency and product water quality.
Help oversee and direct the District’s post-doctoral fellow/associate researcher program.
Coordinate with regulatory agencies and other water agencies regarding monitoring requirements for CECs.
Provide consultation to other OCWD groups (e.g., Public Affairs), MWDOC, and the groundwater producers on water quality, health, and regulatory issues affecting District projects or programs.
Assist in the review and development of legislation regarding water quality requirements and recycled water.
Assist Public Affairs staff with the development and review of technical information to be included in District brochures and the enhanced hallway panels, kiosks, and displays.
3-94
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
Assist Public Affairs staff with hosting and educating visitors from water agencies, regulatory agencies, and other governmental entities.
III Non-Core Activities
Non-core activities (secondary priority compared to core activities) conducted by the Regulatory Affairs include:
Serve on NWRI Board, President of Orange County Chapter of WateReuse CA, and as OCWD primary liaison and Advisory Committee member to the Water Research Foundation.
Participate in Expert Panels for NWRI regarding water recycling and reuse projects planned by other agencies.
Serve on Project Advisory Committees (PACs) for WaterRF research projects and coordinate the service of other staff on such PACs.
Provide presentations to the Water Education Foundation and other groups regarding water quality, health, and regulatory issues.
Assist other water agencies in addressing water quality issues related to groundwater recharge with recycled water.
IV Group Goals for FY 2020-21
Mid-Basin Injection Centennial – Successful complete and document required intrinsic tracer test after project startup, followed by NWRI IAP review and submittal of updated project retention time boundaries to DDW and RWQCB.
GWRS Annual Report – Manage the preparation of the annual report to regulatory agencies on the 2019 calendar year performance of GWRS and results from the testing required by the permit.
Supplement to GWRS Annual Report - With the assistance of the Water Production and Water Quality Departments, prepare a report containing additional detailed analysis of GWRS performance as requested by the NWRI GWRS Independent Advisory Panel.
Santa Ana River Monitoring – Manage the water quality sampling and analysis for the SAR in follow up to the SARWQH Study and the 2018 recommendations of NWRI’s SARMON Panel, and prepare the next SAR Water Quality Report.
GWRS Final Expansion Permitting – Begin the regulatory permitting process and develop related reports and submittals for Final GWRS Expansion.
Enhanced GWRS Source Control – Continue to coordinate with OCSD on the development and implementation of a formal Response Plan to prevent contaminants from adversely affecting GWRS as a part of OCSD’s commitment to enhanced source control efforts.
North Basin Remedial Investigation/Feasibility Study – Provide technical support and guidance regarding regulatory alternatives for cleanup and reuse of contaminated groundwater.
3-95
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
South Basin Remedial Investigation/Feasibility Study – Provide technical support and guidance regarding regulatory alternatives for cleanup and reuse of contaminated groundwater.
Water Quality & Laboratory Groups - Since monitoring needs to exceed resources in Water Quality and Laboratory Groups, programs and projects must be continuously evaluated and prioritized.
R&D for District Critical Needs – Coordinate the Research & Development Department efforts with the most critical research needs for the District, including PFAS treatment, recharge enhancement, MF/RO optimization, UV-AOP optimization and microbial characterization of SAR recharge waters.
GWRS Regulatory Compliance – Obtain additional log removal credits for GWRS via studies of OCSD primary/secondary treatment OCSD and enhanced monitoring at AWPF.
V Pending Activities
Major activities that are not being implemented include:
Develop an annual water quality report card on the groundwater basin.
Develop a more comprehensive water quality testing program to assure adequate data for assessment of emerging contaminants, threats to producer wells and seawater intrusion.
Regulatory validation of treatment alternatives.
VI Staff Addition Needed for FY 2020-21
One Senior or Principal Regulatory Specialist to lead PFAS, GWRS, GAP, and other District permitting and regulatory compliance reporting activities with agencies such as the state Division of Drinking Water, Regional Water Quality Control Board, State Water Resources Control Board, and the federal Environmental Protection Agency.
VII Future Issues
In the next one to three years, issues that the District will need to consider include:
PFAS: permitting of Producer treatment systems; discharges of PFAS within the SAR watershed; increased testing demand on laboratory; enforceable drinking water standards.
Assessment and permitting of additional locations for GWRS water recharge or injection to support GWRS Final Expansion.
Evaluation of new technologies to enhance treatment in the GWRS and to improve energy efficiency and reduce chemical costs, specifically targeting enhanced recovery from the reverse osmosis process and/or concentrate treatment, accompanied by gaining regulatory acceptance.
3-96
REGULATORY AFFAIRS
Orange County Water District FY 2020-21 Work Plan
New and more stringent drinking water standards for contaminants like PFAS, 1,2,3-TCP, total VOCs, nitrosamines, 1,4-dioxane, perchlorate, hexavalent chromium, arsenic, and disinfection by-products of new concern.
Enhanced monitoring and possible treatment requirements for the discharge of GWRS RO concentrate on the OCSD outfall.
Expanded source water assessment obligations that could include the entire SAR watershed and all potential contaminating activities in the watershed.
In consultation with DDW and RWQCB regulatory staff, rewrite and gain approval for new GWRS permit to facilitate future implementation of GWRS Final Expansion and more clearly document updates to operational, monitoring, reporting requirements due to state adoption of Final GRRP Regulations in 2014, and new project features since original permit structure was adopted in 2004.
3-97
WETLANDS OPERATIONS
Orange County Water District FY 2020-21 Work Plan
WETLANDS OPERATIONS
Summary Information
Existing Staff – 2 FTEs
2 – Senior Heavy Equipment Operator
Mission
Operate and maintain the Prado Wetlands to provide natural water quality treatment of Santa Ana River flows behind Prado Dam.
Provide operational oversight and maintenance of District property within the Prado Basin.
Provide logistical and operational support for research activities.
Provide operational support for Natural Resources division.
Coordinate operations with tenant recreational use.
Key Issues for FY 2020-21
Implement an operational strategy to maintain optimal wetlands nitrate removal.
Provide logistical support for OCWD collaborative research project with Engineering Research Center members.
Develop a strategy to reduce mosquito populations in wetland ponds.
Continue to implement improvements to ponds, conveyance channels, and SAR levee infrastructure.
3-98
WETLANDS OPERATIONS
Orange County Water District FY 2020-21 Work Plan
Continue to implement improvements to ponds, conveyance channels, and SAR levee infrastructure.
Account Information
FY 2018-19 Actual
FY 2019-20 Budget
FY 2020-21 Proposed Budget
Salaries and Benefits 268,056 303,174 302,594Services and Supplies 239,324 234,500 259,000
Total $507,379 $537,674 $561,594
I FY 2020-21 Major New Initiatives/Programs
Adjust operational strategy by de-watering designated ponds to maintain optimal treatment retention time due to reduced SAR baseflow.
Provide logistical support for OCWD collaborative research project with the Engineering Research Center and UCR research in Pond E7.
Modify de-watering / vegetation management operations to reduce habitat for mosquito harborage.
II Core Activities
The Wetland Operations group is primarily responsible for the management and operation of the wetland facilities that provide natural water quality treatment of SAR flows behind Prado Dam. The group also supports the Natural Resources group by providing operational oversight and maintenance of OCWD property within the Prado Basin.
Core activities include:
Provide natural water treatment of SAR flows through constructed wetlands in the Prado Basin.
Evaluation of water quality parameters to optimize wetlands operations for maximum nitrate removal.
Maintenance of the levees, roads, and conveyance piping within the wetlands.
Reconstruction of earthen structures and conveyances following storm events to ensure 50 percent of river flows through wetlands.
Support of District approved research projects.
III Non-Core Activities
Non-core activities conducted by the Wetlands Operations group include:
Oversight and operational support of wetlands research projects.
Collection and analysis of pond water quality data.
3-99
WETLANDS OPERATIONS
Orange County Water District FY 2020-21 Work Plan
Support of the District’s education and outreach program by providing tours of the wetlands system.
Support for volunteer functions, such as open houses and group tours.
IV Group Goals for FY 2020-21
Implement Operational Strategy for Optimal Water Treatment Retention Times:
Adjust ponds operations to de-water approximately 100 acres of ponds to reduce system volume, thus maintaining optimal treatment retention time due to reduced SAR baseflow.
Modify Vegetation Management Techniques:
Use OCWD equipment to mow dry vegetation in de-watered ponds. Removal of harvested vegetation from operational ponds.
Provide Logistical Support for Collaborative Research Project:
Operate and maintain pond infrastructure per design specifications in support of the research project with the Engineering Research Center.
Provide operational support for Wetlands research projects.
Provide operational support for the groundwater monitoring program.
Improvements to Wetlands Infrastructure:
Re-build access road to the central basin.
Grade and repair levees in and around the pheasant field.
Develop and Implement Operational Strategies to Reduce Mosquito Harborage:
Manage vegetation removal and de-watering cycles to reduce mosquito breeding habitats.
V Pending Activities (Not Being Addressed Due to Insufficient Resources)
Major activities that are not being conducted include:
Re-establishment of damaged or destroyed monitoring wells to determine the movement of groundwater under the wetland ponds.
Establish SAR streambed gauging station at River Road Bridge.
VI Staff Addition Needed for FY 2020-21
None
VII Future Issues
In the next one to two years, issues the District will need to consider include:
Replacement of non-tier 3 compliant heavy equipment.
Replacement of diversion channel control structure.
3-100
W
AT
ER
PR
OD
UC
TIO
N/G
RO
UN
DW
AT
ER
RE
PL
EN
ISH
ME
NT
SY
ST
EM
Ora
ng
e C
ou
nty
Wat
er D
istr
ict
F
Y 2
020-
21 W
ork
Pla
n
WA
TE
R P
RO
DU
CT
ION
/GR
OU
ND
WA
TE
R R
EP
LE
NIS
HM
EN
T S
YS
TE
M
3-10
1
WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM
Orange County Water District FY 2020-21 Work Plan
Summary Information
Existing Staff 62 FTEs
1 – Executive Director of Operations 1 – Senior Administrative Support Specialist 6 – Supervisors (Operations Manager, Process Control & System Manager
Maintenance Manager, I&E Supervisor, Maintenance Supervisor, and Distribution and Injection Well Supervisor)
20 – Operators 14 – Maintenance Technicians
1 – Auto and Equipment Technician 2 – Utility Maintenance Technicians
2 – Maintenance Scheduler/Planners 1 – Material and Chemical Management Technician 7 – Instrumentation & Electrical Technicians 2 – Process Control System Programmers 1 – Chemist 1 – Chief Plant Operator 2 – Senior Distribution Technicians 1 – Lead Distribution Technician
Mission
Operations and maintenance (O&M) of the GWRS Advanced Water Purification Facility (AWPF), Mid Basin Injection, Talbert Barrier and Green Acres (GAP)
Key Issues for FY 2020-21
Maximize operation of GWRS processes:
Continue to work with the Orange County Sanitation District to make as much water as possible for GWRS production.
Goal for 2020-21 production 97,000-acre-feet.
Send all non-barrier production to Centennial Mid Basin Injection Wells, Canyon Power, Arctic, La Palma, Miraloma, and Kraemer/Miller basins.
Continue to control or reduce the water treatment unit cost by getting the best possible price on electricity, chemicals, and spreading the system’s fixed costs over the maximum possible production.
Reduce GWRS processing costs:
Continue optimization of MF backwash and cleaning regimes.
Optimization of RO cleaning regimes by optimizing clearing chemicalconcentrations and cleaning intervals.
3-102
WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM
Orange County Water District FY 2020-21 Work Plan
Optimization of RO pretreatment chemical program, which includes theuse of acid and antiscalant to reduce cost and prevent mineral scalingof membranes in the 3rd stage of RO units.
Optimize the use of new RO energy recovery devices in six new ROunits to reduce energy cost and/or balance flux performance.
Continue to optimize usage of new antiscalant products to help controlmineral scaling at pH 6.9 to achieve the lowest possible chemical cost.At the same time, continue to engage manufacturers to develop andevaluate antiscalant formulations that would be successful with futurepoorer water quality associated with the GWRS Final Expansion.
Work with purchasing to find and procure the best chemical pricing.
Energy use reduction, load shifting to less expensive nighttime hourswhere possible, and participation in demand response programs thatoffset the cost of electricity.
Investigate the renewal of direct access to energy contracts to helpmaintain or reduce the cost of energy.
Lifespan extension of both MF and RO membranes.
Continue efforts to maximize UV lamp life to 12,000 hours.
Provide technical support and assistance to the GWRS Program Manager in the construction of the GWRS Final Expansion.
Provide support to GWRS Final Expansion construction management firm for construction-related issues, answer requests for information, and review submittals.
Provide Lock Out Tag Out and other construction coordination for GWRS Final Expansion construction contractors.
Manage GWRS assets by:
Continued implementation of a robust preventative maintenanceprogram using the Maximo computerized maintenance managementsystem (CMMS).
Staff continues to update GWRS the work plans in the CMMS to reflectknowledge gain with 10 years of experience operating the treatmentplant.
Continued development of staff capabilities to make both minor andmajor mechanical and electrical repairs on equipment and facilities.These internal capabilities assure a fast response, quality repairs andlower cost.
Protection of injection wells by delivery of low particle water.
Optimize performance, operation costs, and backwash frequency offour new Centennial Park MBI wells.
3-103
WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM
Orange County Water District FY 2020-21 Work Plan
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 9,504,874 10,008,113 9,516,523Services and Supplies 21,253,289 21,919,787 22,704,102
Total $30,758,163 $31,927,900 $32,220,625
I FY 2020-21 Major New Initiatives/Programs
Continue to monitor changes in the MF membrane backwash and cleaning intervals to increase process efficiency and production.
Optimize performance of Evoqua PVDF membranes in cellE03.
Investigate new antiscalant products for use on GWRS Final Expansion expected water quality.
Develop key performance factors that help identify and predict MF and RO membrane end of life conditions.
Support GWRS Program Manager in the construction of the GWRS Final Expansion.
Optimize and learn the operation of four new Centennial Park MBI wells.
II Core Activities
O&M of the 100 mgd GWRS AWPF.
O&M of the 102 well Talbert Injection Barrier.
O&M of Mid Basin Injection Demonstration well.
O&M of four new Centennial Park Mid Basin Injection wells.
O&M of EW-1 well.
O&M of the GAP treatment plant.
Work with Research and Development on engineering and research aimed at maintaining and optimizing treatment plant performance, production, and the Talbert Barrier.
Administering the joint OCWD & OCSD GWRS Steering Committee meetings.
Continue to optimize I&E assets at FHQ maintained by Water Production.
Facilitate monthly OCWD and OCSD Joint Operation Committee meetings.
3-104
WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM
Orange County Water District FY 2020-21 Work Plan
III Non-Core Activities
Participate in technology transfer on advanced treatment with other water districts, consultants, public agencies, and industry organizations.
Provide in-kind support as specified by OCWD for participating Water Reuse Research Foundation and Water Research Foundation research projects.
Provide technical support on various wellhead treatment systems throughout Santa Ana Watershed.
Provide technical support as needed to the Water Quality, Engineering, Hydrogeology, Public Relations, and Health & Regulatory Departments.
Provide facility maintenance support for OCWD’s Fountain Valley facilities.
Provide support to set up meetings and events.
Provide instrumentation and electrical support to OCWD’s recharge and Prado operations.
Provide data collection and monitoring support for the Research & Development Department.
Provide technical updates and participate in meetings with the GWRS Independent Advisory Panel.
Provide assistance with GWRS tours for the Publics Affairs Department as necessary.
Provide any required GWRS technical and operational information for outside data requests.
IV Group Goals for FY 2020-21
GWRS:
1. Produce up to 97,000-acre-feet of water for recharge and injection.
2. Continue efforts to control net production cost to less than $650 per acre-foot.
3. Continued development of the CMMS for the GWRS and update maintenance requirements for existing equipment. Start CMMS planning for new assets to be added as part of the GWRS Final Expansion.
4. Continued development of databases to help staff monitor the individual process performance of the MF, RO, and UV treatment systems.
OCSD:
1. Continue with joint operations meetings with OCSD plant operations andsource control and OCWD staff to ensure both agencies areknowledgeable of issues with each other’s operations.
2. Continue coordinated day to day operation and optimization of the new15-million-gallon volume flow equalization storage tanks.
3-105
WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM
Orange County Water District FY 2020-21 Work Plan
DDW and the RWQCB:
1. Prepare an Annual Report on the GWRS operation with District staff and outside consultant.
2. Develop a new GWRS permit to include the final expansion and consolidation of existing GAP and GWRS operating permits with the RWQCB.
Talbert Barrier:
1. In conjunction with the barrier, staff continues evaluating the corrosivity, and injection well-fouling propensity of the GWRS finished product water.
2. Support Engineering for Talbert Barrier hydraulic improvements project.
V Pending Activities
Continue to develop staff to effectively operate and maintain the GWRS and determine infrastructure needs for the GWRS Final Expansion facilities.
VI Staff Addition Needed for FY 2020-21
None planned for FY 2020-21, but additional staffing needs associated with the GWRS Final Expansion will be evaluated.
VII Future Issues
In the next two years, issues the District will need to consider include:
1. Optimization of the GWRS AWPF treatment process to lower operational costs, including the upcoming loss of MWD LRP subsidy.
2. Continue to optimize MF and RO membrane replacement strategies.
3. Process optimization and adjustment of preventative maintenance requirements as necessary.
4. Continue forward-looking review of water treatment technologies and opportunities to optimize the current GWRS membrane and advanced oxidation treatment processes.
5. Continue to monitor energy issues to ensure the lowest possible power expenditures for the GWRS.
6. Support the operation and maintenance of the District’s four new Centennial Park Mid-Basin Injection wells.
7. Support construction of the GWRS Final Expansion.
8. Support construction of the Talbert Barrier hydraulic improvements.
9. Plan for and support future Talbert Barrier pipeline corrosion assessment and correction project.
3-106
Recharge Operations
Orange County Water District FY 2020-21 Work Plan
RECHARGE OPERATIONS
Summary Information
Existing Staff – 20 FTEs
1 – Director of Recharge & Wetlands Operations 1 – Recharge Operations Supervisor 1 – Field Maintenance Supervisor 1 – Field Operations Supervisor 1 – Ground Maintenance Supervisor 1 – Maintenance Scheduler/Planner 1 – Senior Administrative Support Specialist 2 – Assistant Recharge System Operators 3 – Field Maintenance Technicians 1 – Senior Heavy Equipment Mechanic 2 – Senior Heavy Equipment Operators 3 – Heavy Equipment Operators 1 – Auto & Equipment Operators 1 – Ground Maintenance Technicians
Mission
Replenishment of the groundwater basin by operating and maintaining recharge basins and associated infrastructure, surface water conveyance system, storage and recharge facilities, and managing the conservation pool behind Prado Dam.
3-107
Recharge Operations
Orange County Water District FY 2020-21 Work Plan
Key issues for FY 2020-21
Continued implementation of replacing aging infrastructure and instrumentation.
Continue heavy equipment replacement programs to maintain compliance with the CARB regulatory schedule.
Update landscaping at Anaheim Lake by selective tree removal and installation of native and drought-tolerant plantings.
Upgrade security infrastructure at Field Headquarters and the Santiago Basin complex.
Work with engineering staff to develop District standards for installation and replacement of directly buried valves and actuators.
Replace directly buried 48” valves and actuators at Anaheim Lake / Atwood Channel.
Manage vegetation in a manner that accommodates both the seasonal habitat needs of nesting birds and the use of the land for groundwater recharge.
Continue to upgrade PLC / SCADA hardware.
Continue upgrades to infrastructure, instrumentation, and equipment.
Account Information FY 2018-19
ActualFY 2019-20
BudgetFY 2020-21
Proposed BudgetSalaries and Benefits 2,484,097 2,828,730 2,887,887Services and Supplies 2,141,546 1,654,067 1,358,430
Total $4,625,643 $4,482,797 $4,246,317
I FY 2020-21 Major New Initiatives/Programs
Adapt operations to allow for the purchase and recharge of 65,000 AFY of imported water to help offset the decline is SAR base Flow.
Improve data acquisition and retrieval at diversion points and other critical facility infrastructure to comply with provisions of SB 88.
Develop District standards for installation and replacement of directly buried valves and actuators.
Replace and relocate directly buried valves and actuators to protective vaults.
Collaborate with Field Research Staff to utilize data collected from La Palma infiltration instrumentation to optimize basin operation.
Collaborate with the Hydrogeology Department to utilize WRMS data to inform recharge operations.
3-108
Recharge Operations
Orange County Water District FY 2020-21 Work Plan
Re-landscape Anaheim Lake frontage area along Miraloma Avenue.
II Core Activities
The Recharge Operations group is responsible for replenishing the groundwater basin by operating and maintaining the surface water conveyance system, storage and recharge facilities, and managing the conservation pool behind Prado Dam.
III Non-Core Activities
Support District’s education and outreach program by providing tours of the recharge system.
Providing data and information to outside agencies and organizations.
Support selected research and development efforts aimed at improving recharge efficiency and capacity.
IV Group Goals for FY 2020-21
Develop strategies for the capture of local inflow with Prado storage levels at 498 ft and 505 ft.
Continued implementation of replacing aging infrastructure and instrumentation.
Continue heavy equipment replacement programs to maintain compliance with the CARB regulatory schedule.
Coordinate with engineering staff to establish District standards for installation and replacement of directly buried valves and actuators.
Replace directly buried 48” valves and actuators at Anaheim Lake / Atwood Channel.
Coordinate with the County of Orange to add video surveillance at the County corporation Yard for the SAR at Ball Road to Orangewood Avenue reach.
Upgrade communications at Anaheim Lake to the fiber-optic network.
Manage vegetation in a manner that accommodates both the seasonal habitat needs of nesting birds and the use of the land for groundwater recharge.
Landscape Anaheim Lake frontage along Miraloma Avenue.
V Pending Activities
Implementation of infrastructure repair and replacement projects.
VI Staff Addition Needed for FY 2020-21
None
3-109
Recharge Operations
Orange County Water District FY 2020-21 Work Plan
VII Future Issues
Continued replacement of heavy equipment to maintain compliance with CARB diesel emissions regulations. The cost of equipment upgrades and replacements is substantial. R&R fund reserves have therefore been identified and set aside to accommodate this long term compliance program. All Tier 0 and Tier 1 engines to be replaced by 2024.
Re-locate direct buried valves to underground vaults. Existing buried valves and actuators are 20+ years old and are beginning to fail.
Install inflatable dam in Raymond Basin, which will allow remote operation and use of basin during rain events.
Continue upgrades of flow and water level instrumentation.
Remove islands and peninsulas in Anaheim Lake to increase storage capacity. Add sand and re-grade basin bottom for improved recharge.
Relocate 48” magnetic flowmeter at Kraemer Basin. The current installation is 30 feet above the basin low point.
Installation of transfer pipe with valve between golf concession and Burris Basin to prevent golf lagoon de-watering at low water levels in Burris.
Import sand into the SAR channel between the 5 Coves and Ball Rd. to increase percolation.
3-110
SECTION 4 DEBT SERVICE
DEBT SERVICE
The District often uses debt to fund capital projects approved by the Board. The purpose of the Debt Service is to budget and set aside monies necessary to make principal and interest payments on the District’s debt.
Total gross debt service payments and administration costs are budgeted at $36,046,237 for FY 2020-21 as shown on Table 1. This amount also reflects estimated revenues and payments related to the District’s swap transactions. The components of the budgeted debt service payments are as follows:
$19.23 million for fixed rate debt.
$3.62 million for variable rate debt.
$0.80 million for commercial paper debt.
$1.27 million net swap payment.
$10.16 million for low interest State Loans.
$0.96 million for debt administration.
In November 2002, the Board approved a comprehensive long-term debt program with a number of goals including:
To provide funding for the GWR System and other capital projects.
To provide the lowest cost of funds.
Take advantage of low interest rates and the District’s variable rate debt capacity.
Provide the lowest predictable RA.
In FY 2007-08 the Board adopted an updated Plan of Finance, which provided for repaying some of the District’s highest cost fixed rate debt using low interest state loan reimbursement monies and for execution of two interest rate swap transactions. The overall impact on the District’s debt structure was to lower the District’s overall cost of debt outstanding; reduce the District’s variable rate exposure using an interest rate swap; and reduce the duration of the existing debt outstanding by approximately two years.
Orange County Water District 4-1 FY 2020-21 Budget Report
SECTION 4 DEBT SERVICE
The District’s policy of using long-term debt to fund capital projects was established in October 2000 and calls for the following:
Preliminary project expenses related to direct research are to be paid from the General Fund and cannot be financed with long-term debt.
Project expenses for such items as feasibility reports, pilot studies, engineers reports, compliance with CEQA and project design and construction may be capitalized and funded with long-term debt.
Project expenses that are capitalized and funded with long-term debt and which do not lead to construction of a project will require an adjustment by the Accounting Department to pay off the long-term debt incurred using cash reserves.
Orange County Water District 4-2 FY 2020-21 Budget Report
SECTION 4DEBT SERVICE
Principal Payments
Interest Payments
Debt Administration
Cost Total
Outstanding Debt Balance as of June 30, 2021
2017A &B Refunding Revenue Bond Fixed Rate 385,000$ 4,619,468$ -$ 5,004,468$ 105,115,000$ 2003A COP Variable Rate - 3,569,913 (1) - 3,569,913 129,815,000 2019A Revenue COP Fixed Rate - 2,700,000 2,700,000 135,000,000 2019B Revenue COP Fixed Rate 125,000 317,475 442,475 6,380,000 2019C Refunding Revenue Bonds Fixed Rate 3,370,000 5,534,718 - 8,904,718 95,695,000 2019D Refunding Revenue Bonds Fixed Rate 420,000 1,767,271 - 2,187,271 58,715,000
Subtotal 4,300,000$ 18,508,845$ -$ 22,808,845$ 530,720,000$
SWAPS - $82.55 Million
OCWD Payments - fixed at 3.314% 2,735,707$ -$ 2,735,707$ OCWD Revenues - .56 LIBOR plus .23% - Estimates (1,461,135) (2) - (1,461,135)
State Loans
GWR System C-06-4462-110 444,320$ 36,762$ -$ 481,082$ 1,831,509$ GWR System C-06-4462-120 183,016 22,745 - 205,761 970,649 GWR System C-06-4462-130 162,172 19,541 - 181,713 858,633 GWR System C-06-4462-140 249,603 29,918 - 279,521 1,321,162 GWR System C-06-4462-150 5,928,928 911,146 - 6,840,074 44,606,059 GWR System C-06-4462-160 196,310 23,470 - 219,780 1,038,936 Fletcher Basin C-06-7867-110 129,988 45,679 - 175,667 2,274,164 La Palma Basin C-06-8101-110 161,494 49,774 - 211,268 4,815,886 Mid Basin C-06-8252-110 440,738 250,775 691,513 15,517,030 Alamitos Barrier Improvement C-06-7868-110 610,699 262,548 - 873,247 13,207,590
Subtotal 8,507,268$ 1,652,358$ -$ 10,159,625$ 86,441,618$
Commercial Paper -$ 848,195$ (3) -$ 848,195$ 36,713,000$
Debt Administration 955,000 955,000
TOTAL EXPENDITURES 12,807,268$ 22,283,970$ 955,000$ 36,046,237$ 653,874,618$
(1) Assumes 2.75% interest rate.(2) Assumes LIBOR equal to variable rate of 2.75%.(3) Assumes 2.75% interest rate for taxable and 1.5% for tax-exempt.
TABLE 1DEBT SERVICE BUDGET
FY 2020-21
Certificates of Participation/Refunding Revenue Bonds/Short-Term Notes
Orange County Water District 4-3 FY 2020-21 Budget Report
Section 4Debt Service
Fee Annual Amount
1 Letter of Credit Commercial Paper Fee with Sumitomo Mitsui Banking Corp. $221,300
2Citigroup Quarterly 2003A Remarketing Fee $129.8 M x 0.075% $97,400
3 2003A CitiBank N.A. Letter of Credit $131.9 M x 0.33% $435,300
4Annual Rating Agency Fees: Fitch, Moody's and Standard & Poor's $62,000
5Bond Counsel/Financial Advisor/Arbitrage Service $42,000
6
US Bank Trust Commercial Paper Draw Fees and Quarterly Certificate Fees/Citigroup Commercial Paper Remarketing Fees $45,000
7Union Bank of California Quarterly COP Trust Fees $36,000
8 WIFIA Fee $16,000
Total $955,000
Debt Administration FeesFY 2020-21
$76.3 M x 0.29%
Orange County Water District 4-4 FY 2020-21 Budget Report
SECTION 5 OTHER POST EMPLOYMENT BENEFITS
Orange County Water District 5-1 FY 2019-20 Budget Report
OTHER POST EMPLOYMENT BENEFITS
The Government Accounting Standards Board Statement No. 74, Financial Reporting for Postemployment Benefit Plans Other Than Pension Plans, and GASB 75 - Accounting and Financial Reporting for Postemployment Benefits Other Than Pensions, established new accounting and financial reporting requirements for OPEB plans costs and obligations related to retiree healthcare benefits (Other Post Employment Benefits – OPEB). The statements generally require employers to account for and report the annual cost and outstanding obligations and commitments for these benefits. The GASB standards require that the long-term cost of retiree health care be determined and accrued on an actuarial basis. The results of the valuations are disclosed on the District’s financial statements.
The new standards required the District to receive a new actuarial study in June 2018, with a measurement date as of June 30, 2017. The actuarial study determined the District’s net OPEB liability and the new actuarially determined contributions (ADC) to provide the retiree medical benefit. The Board has directed funding this liability to our PARS trust per the actuarial study measured as of June 30, 2017.
Annual OPEB Cost for the budget year 2020-21 $1,469,000 The District’s actual cost to pay medical premiums for retired employees will be paid out of the PARS trust. This annual cost is estimated at $813,000.
SECTION 6 WATER PURCHASE
Orange County Water District 6-1 FY 2020-21 Budget Report
WATER PURCHASE
The proposed FY 2020-21 water budget is $9.1 million and calls for not purchasing any Metropolitan Water District (MWD) untreated full-service water due to the PFAS issue. Staff expects groundwater pumping to decline by about 90,000 acre-feet due to the State Division of Drinking Water establishing a 10 ppt PFOA Response Level. To offset this decline in revenues to maintain a balanced budget, the District would not purchase any MWD untreated water.
This budget will result in a planned 22,000 acre-feet reduction in the accumulated overdraft assuming a slightly dry hydrological year.
The groundwater basin accumulated overdraft is projected to be approximately 215,000 acre-feet on June 30, 2020. The overdraft is 40,000 acre-feet from the District’s recommended target accumulated overdraft of 175,000 acre-feet (Average of 200,000 acre-feet to 150,000 acre-fee recommended range). The general maximum desired balance in the water reserve fund is to have sufficient funding available to purchase 50% of the water needed from MWD to refill the groundwater basin to the 175,000-acre-foot target. This amounts to 20,000 acre-feet (40,000 acre-feet x 50%) which is estimated to cost $17.1 million using the MWD untreated full-service rate.
Estimated June 30, 2020 Accumulated Overdraft 215,000 af
OCWD Target Accumulated Overdraft Range (150,000 to 200,000 af) 175,000 af
Difference 40,000 af
50% of Difference 20,000 af
2020-21 Average MWD untreated full-service rate including $80/acre-feet for RTS and Capacity Charge ($774+$80)
$854/af
Necessary water fund balance to purchase 20,000 af of water ($854/af x 20,000 af)
$17.1 million
Estimated June 30, 2020 Water Reserve Fund Balance $0 Million
Staff expects to transfer approximately $20.4 million from the water fund to support the construction of PFAS treatment facilities.
The accompanying table provides a detailed summary of the Water Purchase Budget for FY 2020-21. MWD’s rates area assumed to increase on January 1, 2021 by 5%. For budgeting purposes, the cost per acre-foot for MWD water is an average of the existing and expected 2021 rates. The specific water purchase items in the table include:
1. The District anticipates purchasing approximately 3,000 acre-feet of water from the City of Long Beach for injection into the Alamitos Barrier. The cost of this water is
SECTION 6 WATER PURCHASE
Orange County Water District 6-2 FY 2020-21 Budget Report
$5/acre-foot above the cost of MWD Tier I water plus the Readiness-To-Serve and Capacity Charge paid by the City of Long Beach to MWD. The total cost for this water is $1,220/af.
2. The District will not purchase any untreated full service non-interruptible MWD water for recharge at the District’s field headquarters in the City of Anaheim.
3. MWDOC Groundwater Charge – MWDOC charges the District a fee to fund their staff time and other expenses incurred to support OCWD’s programs and purchases of imported water. The expected fee is $650,000.
4. The District incurs a Capacity Charge fee on any purchase of MWD non-interruptible water supplies (i.e., OC-44 connection supplies or untreated non-interruptible water). The Capacity Charge is administered by MWDOC and is now billed monthly to the District as a flat fee. The Capacity Charge for FY 2020-21 will be approximately $1,100,000.
5. The District also incurs a Readiness-To-Serve charge on any purchase of MWD treated non-interruptible water supplies (i.e., OC-44 connection supplies or untreated non-interruptible water). The fee is expected to be approximately $3,700,000 in FY 2020-21.
The total Water Purchase budget expense for FY 2020-21 is $9.1 million.
Sec
tio
n 6
Wat
er P
urc
has
e
Item
#V
olu
me
(AF
)
2020
-21
Un
it C
ost
$/af
(1)
MW
DO
C
Su
rch
arg
e$/
af T
ota
l Co
st
Am
ou
nt
1A
lam
itos
Bar
rier
Inje
ctio
n w
ater
fro
m L
ong
Bea
ch W
ater
De
pt (2
)3,
000
1,22
0.00
n/a
$3,6
60,0
00
2U
ntre
ated
Non
-inte
rru
ptib
le M
WD
wat
er (3
) 0
774.
00
n/a
$0
Su
b-t
ota
l3,
000
$3
,660
,000
3M
WD
OC
Gro
undw
ater
Cha
rge
$650
,000
4M
WD
/MW
DO
C C
apa
city
Cha
rge
(4)
$1,1
00,0
00
5R
eadi
ness
-to-
serv
e ch
arge
is b
ased
upo
n an
4-y
ear
aver
age
of p
revi
ous
purc
hase
s (5
)
$3
,700
,000
To
tal
3,00
0$9
,110
,000
NO
TE
S (1)
Ave
rage
of
2020
and
202
1 ra
tes
(2)
Tre
ated
Non
-inte
rru
ptib
le r
ate
assu
med
to
incr
ease
fro
m $
1,07
8/af
to
$1,1
32/a
f: A
vera
ge is
$1,
105/
afU
nit
cost
incl
udes
$5/
af C
ity o
f Lo
ng B
each
fee
plu
s $1
10/a
f R
TS
and
Cap
acity
Cha
rge
paid
by
Long
Bea
ch t
o M
WD
(3
)U
ntre
ated
non
-inte
rru
ptib
le r
ate
assu
med
to
incr
ease
fro
m $
755/
af t
o $7
93/a
f: A
vera
ge is
$77
4/af
(4)
MW
D/M
WD
OC
Cap
aci
ty C
harg
e is
bill
ed m
onth
ly b
y M
WD
OC
as
a fla
t fee
(5)
Rea
dine
ss-t
o-se
rve
(RT
S)
char
ge is
cal
cula
ted
and
prov
ided
by
MW
DO
C
Fis
cal Y
ear
2020
-21
Bu
dg
et f
or
Wat
er P
urc
has
e (J
uly
1, 2
020
to J
un
e 30
, 202
1)
Ora
ng
e C
ou
nty
Wat
er D
istr
ict
6-3
FY
202
0-21
Bu
dg
et R
epo
rt
SECTION 7 BASIN EQUITY ASSESSMENT
Orange County Water District 7-1 FY 2019-20 Budget Report
BASIN EQUITY ASSESSMENT (BEA) BUDGET
The objective of the BEA program, as authorized by Section 31.5 of the Orange County Water District Act, is to make possible more effective management of the groundwater basin and to equalize water costs within the District.
BEA collections for FY 2020-21 are estimated at $1,750,000, which applies to pumping in excess of the basin production percentage (BPP). The District sets the BEA based upon the price of Metropolitan Water District’s water.
BEA revenue is used to offset the cost of MWD water purchases. Predicting BEA revenue is difficult as it is determined by: (1) groundwater producers who decide to pump above the BPP; (2) groundwater producers participating in water quality projects that receive partial BEA exemptions for pumping above the BPP; and (3) smaller private party pumping.
BEA revenues expected for pumping above the BPP $1,750,000
SECTION 8 CAPITAL IMPROVEMENT PROGRAM
____________________________________________________________________________________ Orange County Water District 8-1 FY 2020-21 Budget Report
CAPITAL IMPROVEMENT PROGRAM
The fiscal year (FY) 2020-21 Capital Improvement Program (CIP) is provided on the following pages. The CIP projects are funded by debt proceeds, grants, litigation settlements, state loans, and $27.2 million from operating revenues. The assets created by the CIP projects typically have a useful life of between three to seventy years.
The total proposed CIP cost for the FY 2020-21 budget is $97.9 million, and it includes 19 projects. The life span of various CIP projects varies from project to project and it can be three years or longer. The District will fund $27.2 million of the $97.9 million dollar CIP budget from the operating revenues. This District practice is very useful in keeping the debt service cost to the minimum and maintaining debt service coverage targets.
The CIP is primarily driven by the following objectives: (1) increasing the District’s recharge capacity to allow for increased sustainable production out of the groundwater basin; (2) protecting water quality by removing contaminated groundwater from the basin and providing additional wetlands treatment for Santa Ana River flows; and (3) protecting the coastal portion of the groundwater basin.
Budgeting of project expenditures does not authorize staff to proceed with a project. Each budgeted project must be individually reviewed and formally approved by the Board via the preparation of an Engineer’s Report. In addition, the Board would need to approve the design and the construction contracts as/if the project progresses forward.
The expenditures for each project are shown in the fiscal year they are anticipated to occur in. The District has many multi-year projects that require several years to process and construct. Table 8-1 provides a broad summary of the projects in the CIP. A brief description and status of each project are provided on the attached Capital Projects Information sheet.
TABLE 8-1 SUMMARY OF PROJECTS IN THE CAPITAL IMPROVEMENT PROGRAM
PROJECT TYPE OBJECTIVE
WATER SUPPLY PROVIDE FOR INCREASED GROUNDWATER PRODUCTION AND CREATE
SUPPLIES WERE ECONOMICAL AS COMPARED WITH MWD RATES. Construct facilities to increase recharge capacity and
percolation rates to allow for increased groundwater pumping Improve existing facilities to increase percolation rates Create a new water supply
WATER QUALITY PROTECT THE QUALITY OF THE GROUNDWATER BASIN SUPPLIES. Protect groundwater in North Basin by extracting and treating
wells threatened by VOC contamination in Anaheim and Fullerton
Protect groundwater in South Basin by extracting and treating wells threatened by VOC contamination in Santa Ana
SECTION 8 CAPITAL IMPROVEMENT PROGRAM
____________________________________________________________________________________ Orange County Water District 8-2 FY 2020-21 Budget Report
PROJECT TYPE OBJECTIVE
COASTAL
IMPROVEMENTS MITIGATE FOR EXISTING AND PROJECTED FUTURE PROBLEMS ALONG
THE COAST. Construct barrier facilities to prevent seawater intrusion
The cost of information for multi-year debt and operating revenue funded projects is summarized in Table 8-2.
The OCWD staff works closely with the Board of Directors in processing capital projects. Formal Board approval is required at various stages of a project’s life, as shown below:
1. Inclusion in OCWD annual budget. 2. Issuance of Request for Proposals for the hiring of consultants for fees
greater than $20,000 to assist in processing project documents. 3. Awarding consultant contracts greater than $20,000. 4. Approval of Feasibility Study Report, if so directed by General Manager. 5. Approval of necessary CEQA documents. 6. Approval of the project Engineer’s Report. 7. Approval of any agreements (i.e. grant funding, interagency). 8. Approval of advertising construction contracts. 9. Award of construction contracts. 10. Approval of change orders greater than 5% of the construction budget. 11. Approval of Notice of Completion.
The District primarily uses long-term debt to fund capital projects. The District policy for using long-term debt was established in October 2000. The policy calls for the following:
Preliminary project expenses related to direct research are to be paid from the General Fund.
Project expenses for such items as feasibility reports, pilot studies, engineer’s reports, compliance with CEQA, and project design and construction may be capitalized and funded with long-term debt.
Project expenses that are capitalized and funded with long-term debt and to which do not lead to the construction of a project will require an adjustment by the Accounting Department to pay off the long-term debt incurred using cash reserves.
Fis
cal Y
ear
Sal
arie
sB
enef
its
Sal
arie
s &
B
enef
its
Pre
-des
ign
Des
ign
Co
nst
ruct
ion
To
tal
02
000
0300
040
010
2020
-21
784,
124
269,
623
1,05
3,74
790
,000
10,8
30,0
0085
,934
,465
97,9
08,2
12
2021
-22
00
017
7,00
0,00
017
7,00
0,00
0
2022
-23
00
021
4,00
0,00
021
4,00
0,00
0
2023
-24
00
036
,000
,000
36,0
00,0
00
2024
-25
00
00
0
JDE
PR
OJE
CT
ID
NO
.P
roje
ct N
ame
Pro
ject
Des
crip
tio
n
P
roje
ct D
etai
lsD
ept.
202
0-21
-
20
,000
20,0
00
202
1-22
-
202
2-23
-
202
3-24
-
202
4-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$60K
20
,000
202
0-21
-
90,
000
3
00,0
00
610
,000
1,0
00,0
00
202
1-22
-
202
2-23
-
202
3-24
-
202
4-25
-
Est
imat
ed T
otal
Cap
ital C
ost:
$133
,000
1
,000
,000
202
0-21
475
,435
165,
370
6
40,8
05
2,0
00,0
00
52,
000,
000
54,
640,
805
202
1-22
-
80,
000,
000
80,
000,
000
202
2-23
-
110,
000,
000
110,
000,
000
202
3-24
-
36,
000,
000
36,
000,
000
202
4-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$292
M
28
0,64
0,80
5
202
0-21
-
1,
500,
000.
00
10
,000
,000
.00
11,
500,
000
2021
-22
-
25,
000,
000.
00
25,
000,
000
2022
-23
-
35,
000,
000.
00
35,
000,
000
2023
-24
-
-
20
24-2
5
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$71.
5M
7
1,50
0,00
0 20
20-2
1
-
1
,250
,000
1
0,00
0,00
0
1
1,25
0,00
0 20
21-2
2
-
2
0,00
0,00
0
2
0,00
0,00
0 20
22-2
3
-
-
2023
-24
-
-
20
24-2
5
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$31.
2M
3
1,25
0,00
0
2C
1800
1
Pra
do
Sh
oo
tin
g R
ang
e B
ulle
t L
ead
In
teri
m R
emed
iati
on
Act
ion
s
Con
solid
ate
bulle
t lea
d co
ntam
inat
ed s
oil
from
inac
tive
area
s in
to th
e sp
ortin
g cl
ay
shoo
ting
rang
e ar
eas
for
rem
edia
tion
at a
la
ter
date
follo
win
g th
e cl
osur
e of
the
activ
e sh
ootin
g ra
nge.
Res
tore
dis
turb
ed
area
s an
d hy
dros
eed
with
nat
ive
plan
ts.
Hire
con
sulta
nts
to o
vers
ee th
e w
ork
and
prep
are
the
need
ed e
nviro
nmen
tal
docu
men
tatio
n. C
onst
ruct
ion
will
bid
out
as
publ
ic w
orks
con
stru
ctio
n an
d-or
sel
f pe
rfor
med
by
oper
atio
ns s
taff.
1069
5-Y
ear
Pro
ject
Tot
al
Sel
ectio
n of
a R
ecor
ds M
anag
emen
t /
Doc
umen
t Im
agin
g so
ftwar
e an
d hi
re
cons
ulta
nts
to im
plem
ent t
he s
yste
m.
Pro
ject
cos
ts in
clud
e: 1
) so
ftwar
e; 2
) im
plem
enta
tion
serv
ices
; and
3)
high
spe
ed
scan
ner.
1016
5-Y
ear
Pro
ject
Tot
al
1C
1900
1
Rec
ord
s M
anag
emen
t/D
ocu
men
t Im
agin
g S
yste
mR
epla
cem
ent o
f cur
rent
out
date
d re
cord
s m
anag
emen
t/doc
umen
t im
agin
g sy
stem
3G
WR
SF
E
GW
RS
Fin
al E
xpan
sio
nE
xpan
sion
of t
he G
WR
S F
acili
ty fr
om
100
MG
D to
the
prod
uctio
n of
130
MG
D
GW
RS
rec
ycle
d w
ater
incl
udin
g O
CS
D
Pla
nt N
o. 2
Con
veya
nce
Fac
ilitie
s
Con
stru
ctio
n in
clud
es th
e ad
ditio
n of
infr
astr
uctu
re, e
quip
men
t, pu
mps
, and
pipe
lines
to e
xpan
d th
e G
WR
S fa
cilit
y an
d th
e in
fras
truc
ture
req
uire
d on
OC
SD
Pla
nt
No.
2 p
rope
rty
to c
onve
y an
d se
greg
ate
the
addi
tiona
l sec
onda
ry e
fflue
nt r
equi
red
for
GW
RS
Fin
al E
xpan
sion
.
1070
5-Y
ear
Pro
ject
Tot
al
CA
PIT
AL
IMP
RO
VE
ME
NT
PR
OG
RA
M S
UM
MA
RY
Gra
nd
To
tal
FIS
CA
L Y
EA
R 2
020-
21
TAB
LE
8-2
AC
CO
UN
T N
O:
CO
ST
CO
DE
C20
XX
XY
LW
D P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
54C
20X
XX
An
ahei
m P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
SEC
TIO
N 8
C
API
TAL
IMPR
OVE
MEN
T PR
OG
RA
M
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
8-3
Fis
cal Y
ear
Sal
arie
sB
enef
its
Sal
arie
s &
B
enef
its
Pre
-des
ign
Des
ign
Co
nst
ruct
ion
To
tal
0200
003
000
4001
0
CA
PIT
AL
IMP
RO
VE
ME
NT
PR
OG
RA
M S
UM
MA
RY
FIS
CA
L Y
EA
R 2
020-
21
TAB
LE
8-2
AC
CO
UN
T N
O:
CO
ST
CO
DE
2020
-21
-
1,0
00,0
00
5,0
00,0
00
6,00
0,00
0 20
21-2
2 -
1
9,00
0,00
0
1
9,00
0,00
0 20
22-2
3 -
-
2023
-24
-
-
20
24-2
5 -
-
Est
imat
ed T
otal
Cap
ital C
ost:
$25M
25,0
00,0
00
2020
-21
2
3,56
2
8
,342
31,
904
3,00
0,00
0 3,
031,
904
2021
-22
-
-
20
22-2
3 -
-
2023
-24
-
-
202
4-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$3M
3,03
1,90
4 20
20-2
1 -
35
0,00
0 2
,000
,000
2,
350,
000
2021
-22
-
2,50
0,00
0
2,50
0,00
0 20
22-2
3 -
-
2023
-24
-
-
20
24-2
5 -
-
Est
imat
ed T
otal
Cap
ital C
ost:
$4.8
M4,
850,
000
2020
-21
20
4,81
0
68,
339
27
3,14
9 1,
154,
465
1,42
7,61
4 20
21-2
2 -
-
2022
-23
-
-
20
23-2
4 -
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$1.1
M1,
427,
614
2020
-21
-
1,0
00,0
00
1,0
00,0
00
2021
-22
-
10,
000,
000
10,
000,
000
2022
-23
-
20,
000,
000
20,
000,
000
2023
-24
-
-
20
24-2
5 -
-
Est
imat
ed T
otal
Cap
ital C
ost:
$31M
31,0
00,0
00
202
0-21
-
1,
000,
000
1
,000
,000
20
21-2
2 -
1
0,00
0,00
0
1
0,00
0,00
0 20
22-2
3 -
2
0,00
0,00
0
2
0,00
0,00
0 20
23-2
4 -
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$31M
31,0
00,0
00
2020
-21
-
800,
000
8
00,0
00
2021
-22
-
3,50
0,00
0
3,50
0,00
0 20
22-2
3 -
1
6,50
0,00
0
1
6,50
0,00
0 20
23-2
4 -
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$20.
8M20
,800
,000
20
20-2
1 -
60
0,00
0
600
,000
20
21-2
2 -
-
2022
-23
-
9,00
0,00
0
9,00
0,00
0 20
23-2
4 -
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$9.6
M9,
600,
000
2020
-21
-
350,
000
3
50,0
00
2021
-22
-
-
20
22-2
3 -
3,
500,
000
3,
500,
000
2023
-24
-
-
20
24-2
5 -
-
Est
imat
ed T
otal
Cap
ital C
ost:
$3.8
M3,
850,
000
C20
XX
X
C20
XX
X
Gar
den
Gro
ve P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
1070
Rem
oval
of a
ppro
xim
atel
y 12
0,00
0 cu
bic
yard
s of
sed
imen
t fro
m P
rado
Bas
in
usin
g tr
aditi
onal
exc
avat
ion
and
dred
ging
eq
uipm
ent
IRW
D P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
C20
XX
XO
ran
ge
PF
AS
Tre
atm
ent
Sys
tem
(s)
PF
AS
Tre
atm
ent S
yste
m(s
)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
C20
XX
X
San
ta A
na
PF
AS
Tre
atm
ent
Sys
tem
(s)
PF
AS
Tre
atm
ent S
yste
m(s
)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
C20
XX
XT
ust
in P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
C20
XX
X
Ser
ran
o W
D P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
5-Y
ear
Pro
ject
Tot
al
8 10 1411 12 136C
20X
XX
Fu
llert
on
PF
AS
Tre
atm
ent
Sys
tem
(s)
PF
AS
Tre
atm
ent S
yste
m(s
)
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
5-Y
ear
Pro
ject
Tot
al
7C
0900
5
Pra
do
Sed
imen
t M
anag
emen
t D
emo
nst
rati
on
Pro
ject
Dem
onst
ratio
n pr
ojec
t to
rem
ove
appr
oxim
atel
y 12
0,00
0 cy
of s
edim
ent f
rom
be
hind
the
dam
at P
rado
usi
ng a
hyd
raul
ic
dred
ge a
nd p
lace
it in
to a
sto
ckpi
le fo
r fu
ture
rem
oval
. T
his
proj
ect w
ill e
valu
ate
how
use
ful a
dre
dge
wou
ld b
e to
rem
ove
sedi
men
ts a
s pa
rt o
f an
ongo
ing
Sed
imen
t M
anag
emen
t Pla
n.
1070
5-Y
ear
Pro
ject
Tot
al
9C
1900
5P
FA
S T
reat
men
t T
esti
ng
Pro
ject
PF
AS
pro
ject
car
ry o
ver
1070
5-Y
ear
Pro
ject
Tot
al
SEC
TIO
N 8
C
API
TAL
IMPR
OVE
MEN
T PR
OG
RA
M
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
8-4
Fis
cal Y
ear
Sal
arie
sB
enef
its
Sal
arie
s &
B
enef
its
Pre
-des
ign
Des
ign
Co
nst
ruct
ion
To
tal
02
000
0300
040
010
CA
PIT
AL
IMP
RO
VE
ME
NT
PR
OG
RA
M S
UM
MA
RY
FIS
CA
L Y
EA
R 2
020-
21
TAB
LE
8-2
AC
CO
UN
T N
O:
CO
ST
CO
DE
2020
-21
-
3
50,0
00
350,
000
2021
-22
-
4,
500,
000
4,
500,
000
2022
-23
-
-
20
23-2
4
-
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$4.8
M
4,8
50,0
00
202
0-21
-
30,
000
300
,000
3
30,0
00
2021
-22
-
-
20
22-2
3
-
-
2023
-24
-
-
20
24-2
5
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$330
,000
330
,000
20
20-2
1
28,
065
8,6
82
3
6,74
8
300
,000
33
6,74
8 2
021-
22
-
2,5
00,0
00
2
,500
,000
20
22-2
3
-
-
2023
-24
-
-
20
24-2
5
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$2.8
M
2,8
36,7
48
2020
-21
5
2,25
1
18,
890
7
1,14
1
1,60
0,00
0
1,67
1,14
1 20
21-2
2
-
-
2022
-23
-
-
20
23-2
4
-
-
2024
-25
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$1.6
M
1,6
71,1
41
2020
-21
-
250,
000
250,
000
2021
-22
-
-
20
22-2
3
-
-
2023
-24
-
-
20
24-2
5
-
-
Est
imat
ed T
otal
Cap
ital C
ost:
$250
,000
250
,000
1070
5-Y
ear
Pro
ject
Tot
al
15C
20X
XX
EO
CW
D P
FA
S T
reat
men
t S
yste
m(s
)P
FA
S T
reat
men
t Sys
tem
(s)
5-Y
ear
Pro
ject
Tot
al
16C
20X
XX
OC
WD
Per
imet
er F
enci
ng
Con
stru
ct s
ecur
ity fe
ncin
g ar
ound
the
perim
eter
of t
he O
CW
D A
dmin
Bui
ldin
g.
The
OC
WD
Adm
in B
uild
ing
can
curr
ently
be
acce
ssed
by
pede
stria
ns w
ithou
t vis
iting
the
guar
d. T
he p
roje
ct w
ill c
onst
ruct
a s
ecur
ity
fenc
ing
arou
nd th
e pe
rimet
er o
f the
OC
WD
A
dmin
Bui
ldin
g to
sec
ure
the
cam
pus
and
dire
ct a
ll vi
sito
rs to
ent
er th
roug
h th
e m
ain
entr
ance
.
Con
stru
ct 9
sha
llow
mon
itorin
g w
ells
to
eval
uate
gro
undw
ater
leve
ls a
nd q
ualit
y
Ass
ess
effe
cts
of g
roun
dwat
er le
vel
chan
ges
on r
ipar
ian
vege
tatio
n gi
ven
decr
ease
d riv
er fl
ows
and
chan
ges
in
grou
ndw
ater
man
agem
ent i
n C
hino
Bas
in;
also
ass
ess
PF
AS
occ
urre
nce
in r
isin
g gr
ound
wat
er th
at c
ontr
ibut
es to
San
ta A
na
Riv
er fl
ows.
1075
5-Y
ear
Pro
ject
Tot
al
C20
XX
X
Pra
do
Bas
in G
rou
nd
wat
er
Inve
stig
atio
n
1075
18C
1800
5
Inve
stig
ate
pote
ntia
l sou
rces
and
do
wng
radi
ent e
xten
t of s
eaw
ater
in
trus
ion
in S
eal B
each
and
Hun
tingt
on
Bea
ch
Su
nse
t G
ap S
eaw
ater
Intr
usi
on
M
on
ito
rin
g W
ells
17C
1800
3
GW
RS
Bu
rris
Bas
in O
utl
etC
onst
ruct
ion
of a
larg
e di
amet
er o
utle
t on
the
GW
RS
pip
elin
e in
to B
urris
Bas
in.
Con
stru
ct 1
1 m
onito
ring
wel
ls a
t 5 lo
catio
ns
to e
valu
ate
intr
usio
n pr
oxim
ity to
do
wng
radi
ent p
rodu
ctio
n w
ells
; one
of t
he
loca
tions
is to
inve
stig
ate
a po
tent
ial
seaw
ater
pat
hway
com
ing
from
Ala
mito
s G
ap5-
Yea
r P
roje
ct T
otal
Con
stru
ctio
n w
ill in
clud
e a
cut-
out t
o B
urris
B
asin
to a
llow
GW
RS
wat
er to
flow
into
B
urris
and
sub
sequ
ently
flow
to th
e R
iver
view
, Fle
tche
r, a
nd S
antia
go B
asin
s as
w
ell a
s S
antia
go C
reek
. A tr
acer
stu
dy w
ill
be p
erfo
rmed
to v
erify
GW
RS
wat
er tr
avel
tim
e.
1070
5-Y
ear
Pro
ject
Tot
al
Des
ign
and
cons
truc
tion
of P
FA
S tr
eatm
ent
vess
el s
yste
ms
to r
emov
e th
e P
FA
S
cont
amin
ant f
rom
the
wat
er p
rior
to
indi
vidu
al P
rodu
cers
ser
ving
to c
usto
mer
s.
1070
19
SEC
TIO
N 8
C
API
TAL
IMPR
OVE
MEN
T PR
OG
RA
M
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
8-5
Section 9 New Equipment Summary
Orange County Water District 9-1 FY 2020-21 Budget Report
EQUIPMENT (FIXED ASSETS) SUMMARY
This section describes the equipment items proposed for FY 2020-21.
There are 19 equipment items listed in Table 9-1. These items will be funded using operating revenues.
Sec
tio
n 9
New
Eq
uip
men
t S
um
mar
y
Item
Nam
eIt
em D
escr
ipti
on
Dep
artm
ent
Bu
dg
et
Am
ou
nt
Info
rmat
ion
Ser
vice
s (
1016
)
1F
irew
all r
epla
cem
ent
Fire
wal
l rep
lace
men
t for
Fou
ntai
n V
alle
y -
hard
war
e, s
oftw
are
and
sec
urity
sub
scrip
tion
serv
ices
Info
rmat
ion
Sys
tem
s (1
016)
25,0
00
2C
isco
net
wor
king
har
dwar
eR
epla
cem
ent o
f 2 o
bsol
ete
Cis
co s
witc
hes
in A
dmin
bui
ldin
g an
d in
crea
se d
ata
capa
city
and
th
rou g
hput
of L
abor
ator
y bu
ildin
gIn
form
atio
n S
yste
ms
(101
6)30
,000
E16
.171
10.1
016
To
tal
Info
rmat
ion
Sys
tem
s (1
016)
55,0
00
Wat
er Q
ual
ity
(103
6)
3
FO
RD
F-1
50 P
ICK
-UP
TR
UC
K4X
4 S
UP
ER
CR
EW
For
d F
-150
4x4
pic
k-up
truc
k w
ith lo
w-p
rofil
e tr
affic
ligh
t bar
. T
he tr
uck
will
be
used
for
sam
ple
colle
ctio
n ac
tiviti
es in
off-
road
con
ditio
ns in
upp
er S
anta
Ana
Riv
er w
ater
shed
are
as a
nd s
ampl
e co
llect
ion
at m
any
grou
ndw
ater
pro
duct
ion
wel
ls w
ithin
the
OC
WD
gro
undw
ater
bas
in.
The
truc
k is
bei
ng p
urch
ased
to r
epla
ce th
e 20
03 F
-150
4x4
Cre
w C
ab p
ick-
up tr
uck
(T-1
22)
that
is c
urre
ntly
m
ore
than
17
year
s ol
d w
ith 1
24,0
00 m
iles.
The
truc
k is
sho
win
g m
ultip
le m
aint
enan
ce is
sues
su
ch a
s tr
ansm
issi
on s
hifti
ng is
sues
, a le
akin
g ro
of d
urin
g ra
in, a
nd r
ecen
tly th
e tr
uck
had
a fu
el
inje
ctio
n sy
stem
issu
e. A
rel
iabl
e tr
uck
is n
eede
d by
the
Wat
er Q
ualit
y D
epar
tmen
t as
this
4x4
tr
uck
will
ofte
n be
the
prim
arily
truc
k us
ed fo
r sa
mpl
e co
llect
ion
requ
iring
off-
road
cap
abili
ties
at
diffi
cult
to a
cces
s si
tes.
Wat
er Q
ualit
y (1
036)
40,0
00E
16.1
7110
.103
6T
ota
l W
ater
Qu
alit
y (1
036)
40,0
00
4P
rom
oChr
om S
PE
-03
Auo
tmat
ed 8
-por
t SP
E s
yste
m fo
r P
FA
S s
ampl
e ex
trac
tion
Labo
rato
ry (
1038
)35
,000
5T
herm
o A
utot
race
SP
E 2
80A
utom
ated
SP
E s
yste
m fo
r N
itros
amin
es a
nd 1
,4-d
ioxa
ne ,
repl
acin
g 1
of 9
(15
yea
rs o
ld)
Labo
rato
ry (
1038
)49
,000
6C
entu
rion
Pur
ge/T
rap/
Aut
osam
pler
Vol
atile
Org
anic
Com
poun
ds (
VO
C)
ana
lysi
s: E
PA
524
.2La
bora
tory
(10
38)
45,0
00
7F
urna
ce B
ox 1
200C
B
akin
g U
V a
nd T
OC
sam
plin
g bo
ttles
La
bora
tory
(10
38)
10,0
00
8T
urbo
Vap
Con
cent
rato
rS
ampl
e E
xtra
ct E
vapo
rato
n us
ing
Nitr
ogen
gas
, rep
laci
ng 1
out
of 1
2 (
11 y
ears
old
)La
bora
tory
(10
38)
12,0
00
9S
cien
tific
Ref
riger
ator
Rep
lace
1 o
ut o
f 19
sam
ple
stor
age
units
(20
yea
rs o
ld)
Labo
rato
ry (
1038
)9,
000
E20
.171
10.1
038
To
tal
Lab
ora
tory
(10
38)
160,
000
Wat
er P
rod
uct
ion
(10
50)
10M
aint
enan
ce M
echa
nic
Ele
ctric
Car
t3-
mai
nten
ance
48V
Bur
den
Sty
le M
ecah
anic
's c
arts
@ $
16,6
66 E
aW
ater
Pro
duct
ion
(105
0)50
,000
11P
icku
p T
ruck
for
Ope
ratio
ns (
F-1
50
or s
imila
r )R
epla
ce a
nd s
urpl
us e
xist
ing
2002
T-1
21 F
ord
Ran
ger
mid
-siz
e pi
ckup
truc
k de
dica
ted
to
oper
atio
ns fo
r tr
avel
ling
to o
ff si
te d
istr
ict o
pera
tiona
l fac
ilitie
s.W
ater
Pro
duct
ion
(105
0)40
,000
12A
mm
onia
Ana
lyze
r fo
r G
AP
Pla
ntT
he T
russ
el T
ech
disi
nfec
tion
stud
y re
com
men
ded
mon
itorin
g of
am
mon
ia r
esid
ual t
o op
timiz
e di
sinf
ectio
n an
d ch
lorin
e us
age
. In
stal
latio
n an
d in
tegr
atio
n in
to D
elta
V b
y I&
E.
Wat
er P
rodu
ctio
n (1
050)
30,0
00
13F
ree
Chl
orin
e A
naly
zer
for
GA
P
Pla
nt
The
Tru
ssel
Tec
h di
sinf
ectio
n st
udy
also
rec
omm
ends
free
chl
orin
e m
onito
ring
of G
AP
cle
arw
ell
to o
ptim
ize
disi
nfec
tion
and
avoi
d po
ssib
le T
.Col
i vio
latio
ns.
Pric
e in
clud
es a
naly
zer,
tran
smitt
er
and
inte
grat
ion
part
s w
ith in
stal
latio
n do
ne in
hou
se b
y I&
E.
Wat
er P
rodu
ctio
n (1
050)
15,0
00
E
19.1
7110
.105
0T
ota
l W
ater
Pro
du
ctio
n (
1050
)13
5,00
0
TA
BL
E 9
-1F
Y 2
020-
21 P
RO
PO
SE
D E
QU
IPM
EN
T B
UD
GE
TF
UN
DE
D B
Y O
PE
RA
TIN
G R
EV
EN
UE
S
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
9-2
Sec
tio
n 9
New
Eq
uip
men
t S
um
mar
y
Item
Nam
eIt
em D
escr
ipti
on
Dep
artm
ent
Bu
dg
et
Am
ou
nt
TA
BL
E 9
-1F
Y 2
020-
21 P
RO
PO
SE
D E
QU
IPM
EN
T B
UD
GE
TF
UN
DE
D B
Y O
PE
RA
TIN
G R
EV
EN
UE
S
Rec
har
ge
Op
erat
ion
s (1
060)
14W
ater
wag
onM
ultiq
uip
WT
5HP
mob
ile w
ater
trai
ler
with
cen
trifu
gal p
ump
Rec
harg
ed O
pera
tions
(10
60)
19,8
00
15
Gat
or (
4x4
mot
oriz
ed c
art)
4x4
mot
oriz
ed c
art t
o re
plac
e R
T-2
7 th
at fa
iled
this
fisc
al y
ear
Rec
harg
ed O
pera
tions
(10
60)
17,7
50
16A
mph
ibou
s V
ehic
le
mot
oriz
ed v
ehic
le th
at c
an tr
avel
bet
wee
n la
nd a
nd w
ater
- el
imin
ates
boa
t lau
nch
ram
p at
S
antia
go B
asin
s. T
he b
oat r
amp
is to
o m
uddy
to la
unch
a b
oat m
ost o
f the
yea
r. C
ritic
al P
Ms
to
the
San
tiago
floa
ting
pum
psta
tion
are
bein
g m
isse
d du
e to
insu
ffici
ent a
cces
s.
Rec
harg
ed O
pera
tions
(10
60)
37,0
00
17P
ick-
up tr
uck
F-2
50 4
x4 fo
r re
sear
ch s
ampl
ing
and
FH
Q o
ps b
ack-
up v
ehic
le. D
ispo
se o
f T-8
6 an
d on
e ot
her
Rec
harg
ed O
pera
tions
(10
60)
48,7
50
18
Out
boar
d m
otor
ou
tboa
rd m
otor
for
dist
rict b
oat B
-6R
echa
rge
Ope
ratio
ns (
1060
)5,
100
19
Out
boar
d m
otor
ou
tboa
rd m
otor
for
dist
rict b
oat B
-8R
echa
rge
Ope
ratio
ns (
1060
)5,
100
E
19.1
7110
.106
0T
ota
l R
ech
arg
ed O
per
atio
ns
(106
0)13
3,50
0
523,
500
$
Gra
nd
To
tal f
or
Eq
uip
men
t F
un
ded
by
Op
erat
ing
Rev
enu
es
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
9-3
Section 10 Replacement and Refurbishment Fund
____________________________________________________________________________________
Orange County Water District 10-1 FY 2020-21 Budget Report
REPLACEMENT AND REFURBISHMENT BUDGET
The District has over $1.167 billion in assets, excluding construction in progress, that will need to be replaced or refurbished at some point in the future. To prevent additional pressure on the Replenishment Assessment, a replacement and refurbishment model was developed in 1998, which included all District assets and used engineer’s estimates for the useful life of each asset. This model is capable of forecasting future costs and required revenue streams and is updated annually.
The Replacement and Refurbishment (R&R) fund was originally funded in FY 1998-99 with $15 million from the District Replacement Reserves and $20 million from the Orange County bankruptcy proceeds.
In 2004 the R&R program was downsized to only include infrastructure type assets. The amount of money annually transferred into the R&R program was reduced from $4.5 million annually to $2.8 million. The annual transfer amount has been growing by 7% to provide sufficient funds to meet future expected R&R expenses. The fiscal year 2020-21 contribution is $19.2 million. In light of the financial concerns created by the Coronavirus pandemic, the District will utilize $5 million in R&R reserves in FY 2020-21 to lower the Replenishment Assessment.
An update to the R&R Model was made in 2007 and the changes included:
1. All infrastructure replacement cost have been updated. 2. The R&R Fund balance was set at the current amount of $61.8 million with an
expected interest earnings rate of 5% over the next 30 years. 3. The inflation rate was increased from 3% to 3.5% to reflect recent increases in
construction material. 4. The cost of repairing and refurbishing the Talbert barrier injection wells has been
moved out of the R&R program and into the District’s general fund. 5. The cost of major lab equipment costing greater than $100,000 has been moved
into the R&R program.
Another update to the Model was conducted in 2011 and the changes include the following:
1. Eliminated the replacement of the Green Acres Project’s conventional filtration technology as it will be replaced by an expansion of the microfiltration treatment of GWRS.
2. The Basin Cleaning Vehicles (BCV) was removed from the R&R Model as the BCV Program was discontinued.
3. Pump stations electrical and pumps were separated from buildings as they were previously treated as a single unit in the R&R Model.
4. Transferred $10 million in reserves from the R&R Fund to the Operating Fund.
Section 10 Replacement and Refurbishment Fund
____________________________________________________________________________________
Orange County Water District 10-2 FY 2020-21 Budget Report
Actual expenditures from the fund vary significantly each year depending upon which District assets have reached the end of their useful life and need to be replaced or which assets can have their lives extended by refurbishing them. In FY 2020-21, the proposed R&R expenses include these five major items.
Replacements MF Membranes for Train C ($4,383,425). Smith Basin rehabilitation ($3,042,539). Replacement of RO Membranes in 6 RO units ($2,600,000). Video Monitoring System Upgrades ($1,500,000) Talbert Extraction Well Decommissioning (BS13) ($823,419)
The proposed expenditures for FY 2020-21 are $14.2 million.
#P
roje
ct ID
Item
Des
crip
tio
nD
epar
tmen
t S
alar
ies
& B
enef
its
Pro
ject
Co
st
To
tal
Pro
ject
Co
st
Ass
et C
lass
R
efu
rbis
hm
ent
or
Rep
lace
men
tA
sset
A
ge
Lab
(10
38)
1R
20X
XX
Aut
omat
ed T
itrat
or
Ana
lysi
s of
pH
/ E
C/
Alk
alin
ity,
and
Res
idua
l Chl
orin
e fo
r el
ecot
roni
c da
ta t
rans
fer
to L
IMS
Labo
rato
ry (
1038
)-
120,
000
120,
000
Lab
Equ
ipm
ent
> $
100,
000
Rep
lace
men
t12
To
tal
Lab
ora
tory
(10
38)
-$
120,
000
$
12
0,00
0$
Wat
er P
rod
uct
ion
(10
50)
2R
20X
XX
Rep
lace
men
t M
F M
embr
anes
for
Tra
in C
Rep
lace
5,4
72 m
embr
anes
in 8
cel
ls o
f M
F t
rain
C a
nd a
lso
proc
ure
20 s
pare
Pol
ypro
pyle
ne m
odul
es.
Wat
er P
rodu
ctio
n(10
50)
-
4,
383,
425
4,38
3,42
5
RO
, M
F u
nits
Rep
lace
5
3R
20X
XX
Rep
lace
men
t of
RO
Mem
bran
es in
6 R
O u
nits
Rep
lace
6,3
00 m
embr
anes
in R
O u
nits
B01
, B
02,
C01
, C
02,
D01
,D
02 t
hat
are
expe
rienc
ing
irrev
ersi
ble
foul
ing
and
orde
r 50
sp
ares
for
a t
otal
of
6350
RO
mem
bran
es.
Pric
e in
clud
es t
ax
and
frei
ght.
Wat
er P
rodu
ctio
n(10
50)
-
2,
600,
000
2,60
0,00
0
RO
, M
F u
nits
Rep
lace
44
R20
XX
XR
O T
rans
fer
Pum
p R
efur
bish
RO
Tra
nsfe
r P
ump
Wat
er P
rodu
ctio
n(10
50)
200,
000
200,
000
Pum
psR
efur
bish
men
t13
5R
20X
XX
Are
a 64
0 U
nint
erup
tabl
e P
ower
Sup
ply
Rep
lace
UP
S s
yste
m a
nd b
atte
ry s
yste
m in
its
entir
eity
Wat
er P
rodu
ctio
n(10
50)
-
80
,000
80
,000
S
ubst
atio
nsR
epla
ce11
6R
20X
XX
Bul
k T
ank
Ladd
ers
Rep
lace
fib
ergl
ass
ladd
ers
with
sta
inle
ss s
teel
ladd
ers
Wat
er P
rodu
ctio
n(10
50)
75,0
00
75,0
00
Oth
erR
epla
ce12
7R
20X
XX
Pai
ntin
g in
Adm
in B
uild
ing
Pai
ntin
g of
var
ious
por
tions
of
the
inte
rior
of t
he A
dmin
bui
ldin
g in
clud
ing
cent
er a
rea
near
C-2
and
wal
ls in
cor
ridor
out
side
C-4
.W
ater
Pro
duct
ion(
1050
)20
,000
20
,000
B
uild
ings
Ref
urbi
shm
ent
208
R20
XX
XA
rea
240
Uni
nter
upta
ble
Pow
er S
uppl
yR
epla
ce U
PS
sys
tem
and
bat
tery
sys
tem
in it
s en
tirei
tyW
ater
Pro
duct
ion(
1050
)-
50,0
00
50,0
00
Sub
stat
ions
Rep
lace
119
R20
XX
XR
O F
eed
Pum
pR
efur
bish
RO
Fee
d P
ump
Wat
er P
rodu
ctio
n(10
50)
40,0
00
40,0
00
Pum
psR
efur
bish
men
t13
10R
20X
XX
San
ta A
na R
esev
oir
Del
ta V
Rep
lace
Del
ta V
Com
pute
r ha
rdw
are
and
upgr
ade
soft
war
e ve
rsio
nW
ater
Pro
duct
ion(
1050
)-
30,0
00
30,0
00
SC
AD
AR
epla
ce10
11R
20X
XX
Med
ium
vol
tage
driv
es m
otor
pro
tect
ion
Rel
ays
Rep
lace
the
obs
olet
e 82
5P M
PP
rel
ays
on 3
med
ium
vol
tage
V
FD
sW
ater
Pro
duct
ion(
1050
)-
27,0
00
27,0
00
Pum
psR
epla
ce1
12R
20X
XX
Out
side
Pro
cess
Are
as C
anop
y Li
ghtin
gR
epla
ce H
ID h
igh
bay
light
ing
with
ene
rgy
effic
ient
LE
Ds
Wat
er P
rodu
ctio
n (1
050)
-
20
,000
20
,000
B
uild
ings
Rep
lace
1113
R20
XX
XT
otal
Chl
orin
e A
naly
zers
for
GA
P P
lant
(2)
Rep
lace
2 e
xist
ing
To
tal C
hlor
ine
Ana
lyze
rs a
t en
d of
life
Wat
er P
rodu
ctio
n(10
50)
-
18
,000
18
,000
S
CA
DA
Rep
lace
15
14R
20X
XX
Lab
BM
S S
yste
m S
erve
r U
pgra
deR
epla
ce t
he P
hoen
ix s
yste
m s
erve
r w
hich
is r
unni
ng X
P a
s it
is
obso
lete
. T
his
syst
em m
anag
es a
ll of
the
fum
e ho
ods,
lab
room
ai
rflo
ws
and
pres
sure
s.W
ater
Pro
duct
ion
(105
0)-
7,00
0
7,
000
Bui
ldin
gsR
epla
ce7
To
tal
Wat
er P
rod
uct
ion
s (1
050)
-$
7,55
0,42
5$
7,55
0,42
5$
Rec
har
ge
Op
eati
on
s (1
060)
15R
20X
XX
Sup
ervi
sory
Con
trol
and
Dat
a A
cqui
sitio
n R
epla
cem
ent
Rep
lace
SC
AD
A s
yste
m.
Rep
lace
all
SC
AD
A h
ardw
are
and
soft
war
e (le
vel 1
and
Lev
el 2
)R
echa
rge
Ope
ratio
ns(1
060)
-
12
0,00
0
12
0,00
0
S
CA
DA
Rep
lace
men
t8
16R
20X
XX
Infr
astr
uctu
re &
Equ
ipm
ent
Rep
air
The
se f
unds
are
to
refu
rbis
h or
rep
lace
GW
RS
, G
AP
and
F
ount
ain
Val
ley
cam
pus
build
ing
mec
ahni
cal,
elec
tric
al a
nd
stru
ctur
al it
ems
that
une
xpec
tly f
ail
Rec
harg
e O
pera
tions
(106
0)-
100,
000
100,
000
Pip
e/P
ipel
ine,
Pum
ps,
Wel
ls,
Bui
ldin
g,
RO
, M
F u
nits
Rep
lace
men
t or
R
efur
bish
men
tV
aryi
ng17
R20
XX
XLE
D L
ight
s un
der
equi
pmen
t ca
nopy
LED
Lig
hts
unde
r he
avy
equi
pmen
t st
orag
e ca
nopy
Rec
harg
e O
pera
tions
(10
60)
-
35
,000
35
,000
O
ther
Rep
lace
men
t20
+
18R
20X
XX
Aum
a va
lve
actu
ator
Aum
a va
lve
actu
ator
with
nut
and
ste
m f
or t
he s
outh
ern
dive
rsio
n
box
at t
he 5
cov
es d
am.
R
echa
rge
Ope
ratio
ns (
1060
)-
18,4
66
18,4
66
Oth
erR
epla
cem
ent
2519
R20
XX
XA
uma
valv
e ac
tuat
orA
uma
valv
e ac
tuat
or W
arne
r B
ypas
s to
War
ner
Cha
nnel
Rec
harg
e O
pera
tions
(10
60)
-
5,
500
5,50
0
O
ther
Rep
lace
men
t25
To
tal
Rec
har
ge
Op
erat
ion
s (1
060)
-$
278,
966
$
27
8,96
6$
Wet
lan
d O
per
atio
ns
(106
2)20
R20
XX
XB
ulld
ozer
Cat
erpi
llar
D-6
T T
ier
4 di
esel
pow
ered
bul
ldoz
erW
etla
nd O
pera
tions
(10
62)
-
57
6,46
2
57
6,46
2
T
ota
lW
etla
nd
s O
pea
rati
on
s (1
062)
-$
576,
462
$
57
6,46
2$
En
gin
eeri
ng
(10
70)
21
R17
026
Sm
ith B
asin
Reh
abili
tatio
n
San
tiago
Cre
ek is
shi
ftin
g to
the
sou
th a
nd c
ausi
ng t
he s
lope
s of
S
mith
Bas
in t
o er
ode
clos
er t
o V
illa
Par
k R
d ab
ove
the
sout
h sl
ope
of t
he b
asin
. T
his
proj
ect
will
res
tore
the
cre
ek t
o its
pr
evio
us p
ath
and
repa
ir th
e er
osio
n to
the
slo
pes
in t
he b
asin
. E
ngin
eerin
g (1
070)
42,5
39
3,00
0,00
0
3,
042,
539
R
echa
rge
Bas
ins
Ref
urbi
shm
ent
32
22R
1703
4V
ideo
Mon
itorin
g S
yste
m U
pgra
des
Upg
rade
the
Dis
tric
t's V
ideo
Mon
itorin
g S
yste
m (
VM
S)
serv
er
and
exis
ting
cam
era
s, a
s w
ell a
s ad
d ca
mer
as t
o O
CW
D
faci
litie
s.E
ngin
eerin
g (1
070)
-
1,
500,
000
1,50
0,00
0
Bui
ldin
gsR
epla
cem
ent
23
R20
XX
XG
AP
Dis
trib
utio
n an
d R
eser
voir
Val
ve R
epai
rs
Rep
lace
tw
o bu
tter
fly v
alve
s at
the
GA
P's
San
ta A
na R
eser
voir
that
are
not
fun
ctio
ning
pro
perly
. R
epla
ce/r
epai
r pi
pelin
e ap
purt
enan
ces:
leak
y or
bro
ken
valv
es,
burie
d va
lve
cans
, an
d br
oken
cat
hodi
c pr
otec
tion
test
sta
tions
.E
ngin
eerin
g (1
070)
-
10
0,00
0
10
0,00
0
P
ipe/
Pip
elin
eR
epla
cem
ent
29
24R
20X
XX
Dis
tric
t W
ide
Cat
hodi
c P
rote
ctio
n T
estin
gLo
cate
and
rea
d ca
thod
ic p
rote
ctio
n te
st s
tatio
ns a
nd r
ecifi
ers
dist
rict-
wid
e.
Thi
s ef
fort
is p
erfo
rmed
eve
ry 5
yea
rs t
o as
sess
so
il-st
ruct
ure
corr
osio
n.E
ngin
eerin
g (1
070)
-
50
,000
50
,000
P
ipe/
Pip
elin
eR
efur
bish
men
tV
arie
sT
ota
lE
ng
inee
rin
g (
1070
)42
,539
$
4,65
0,00
0$
4,69
2,53
9$
FIS
CA
L Y
EA
R 2
020-
21P
RO
PO
SE
D R
EP
LA
CE
ME
NT
& R
EF
UR
BIS
HM
EN
T F
UN
D R
EQ
UE
ST
S
Sect
ion
10
Rep
lace
and
Ref
urbi
shm
ent F
und
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
10-3
#P
roje
ct ID
Item
Des
crip
tio
nD
epar
tmen
t S
alar
ies
& B
enef
its
Pro
ject
Co
st
To
tal
Pro
ject
Co
st
Ass
et C
lass
R
efu
rbis
hm
ent
or
Rep
lace
men
tA
sset
A
ge
FIS
CA
L Y
EA
R 2
020-
21P
RO
PO
SE
D R
EP
LA
CE
ME
NT
& R
EF
UR
BIS
HM
EN
T F
UN
D R
EQ
UE
ST
S
Hyd
rog
elo
gy
(107
5)
25R
1802
5T
albe
rt E
xtra
ctio
n W
ell D
ecom
mis
sion
ing
Dem
olis
h/ba
ckfil
l 7 u
nnec
essa
ry a
nd u
nuse
d ex
trac
tion
wel
l va
ults
and
pip
elin
es,
and
inst
all o
ne m
onito
ring
wel
l to
repl
ace
wel
l P10
; w
ell d
estr
uctio
n w
as c
ompl
eted
in F
Y19
-20
Hyd
roge
olog
y (
1075
)33
,419
79
0,00
0
82
3,41
9
W
ells
(al
l typ
es)
Dec
omm
issi
on50
+
26R
20X
XX
Mon
itorin
g W
ell A
MD
-3 P
acke
r R
epla
cem
ent
and
Red
evel
opm
ent
Rep
lace
infla
tabl
e pa
cker
s an
d in
tern
al c
asin
g 1,
300-
foot
dee
p,
10-z
one
Wes
bay-
type
mon
itorin
g w
ell i
n A
nahe
im.
Incl
udes
re
deve
lopm
ent
of s
cree
ns.
Hyd
roge
olog
y (1
075)
-
15
0,00
0
15
0,00
0
W
ells
(al
l typ
es)
Ref
urbi
shm
ent
29T
ota
lH
ydro
geo
log
y (1
075)
33,4
19$
94
0,00
0$
97
3,41
9$
R&
R G
ran
d T
ota
l75
,958
$
14,1
15,8
53$
14
,191
,811
$
Sect
ion
10
Rep
lace
and
Ref
urbi
shm
ent F
und
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
10-4
Page No.1010 General Manager’s Office 11-1
1012 Public Affairs 11-3
1016 Information Services 11-5
1018 Board Administration 11-7
1022 Purchasing 11-9
1024 Finance 11-11
1030 Human Resources 11-13
1034 Safety & Risk Management 11-15
1036 Water Quality 11-18
1038 Laboratory 11-20
1040 Research & Development 11-22
1044 Planning and Watershed Management 11-24
1045 Local Resources 11-26
1046 Regulatory Affairs 11-27
1050 Water Production/GWR System 11-29
1060 Recharge Operations 11-37
1062 Wetland Operations 11-40
1069 Property Management 11-43
1070 Engineering 11-45
1075 Hydrogeology 11-47
1080 Natural Resources 11-50
GENERAL FUND BUDGETCOST CENTER DETAIL
Cost Center
Des
crip
tion
9900
9987
1914
9977
9976
9922
AC
TIV
ITY
CO
DE
Gen
eral
Pos
eido
nP
FA
SN
.B. L
itigt
nS
.B. L
itigt
nG
WR
SS
ALA
RIE
S &
BE
NE
FIT
S10
10.5
0104
RE
GU
LAR
SA
LAR
IES
146,
014
30,5
98
91
,795
30,5
98
30
,598
61,1
97
39
0,80
0
10
10.5
0210
PA
YR
OLL
TA
XE
S2,
615
69
3
2,
078
69
3
69
3
1,
385
8,
157
10
10.5
0202
RE
TIR
EM
EN
T24
,311
5,09
5
15,2
84
5,
095
5,
095
10
,189
65,0
68
10
10.5
0204
HE
ALT
H IN
SU
RA
NC
E17
,790
2,25
6
6,76
7
2,25
6
2,25
6
4,51
1
35,8
34
10
10.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
876
184
551
184
184
367
2,34
5
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
191,
607
38,8
25
11
6,47
4
38
,825
38,8
25
77
,649
502,
205
1010
.511
02D
IST
RIC
T M
EM
BE
RS
HIP
S
AM
ER
ICA
N M
EM
BR
AN
E T
EC
HN
OLO
GY
AS
SO
CIA
TIO
N82
5
82
5
C
HA
MB
ER
S O
F C
OM
ME
RC
E5,
000
5,
000
AM
ER
ICA
N W
AT
ER
WO
RK
S A
SS
OC
IAT
ION
(A
WW
A)
1,95
0
1,95
0
AS
SO
CIA
TIO
N O
F C
ALI
FO
RN
IA C
ITIE
S -
OR
AN
GE
CO
UN
TY
(A
CC
-OC
)5,
300
5,
300
AS
SO
CIA
TIO
N O
F C
ALI
FO
RN
IA W
AT
ER
AG
EN
CIE
S (
AC
WA
)33
,000
33,0
00
A
SS
OC
IAT
ION
OF
ME
TR
OP
OLI
TO
N W
AT
ER
AG
EN
CIE
S (
AM
WA
)4,
500
4,
500
C
AL
DE
SA
L5,
000
5,
000
C
AL
ST
AT
E F
ULL
ER
TO
N D
EM
OG
RA
PH
ICS
4 x
$12
,500
50,0
00
50
,000
CA
LIF
OR
NIA
MU
NIC
IPA
L U
TIL
ITIE
S A
SS
OC
IAT
ION
(C
MU
A)
13,5
00
13
,500
CA
LIF
OR
NIA
SP
EC
IAL
DIS
TR
ICT
S A
SS
OC
IAT
ION
(C
SD
A)
8,00
0
8,00
0
GR
OU
ND
WA
TE
R R
ES
OU
RC
ES
FO
UN
DA
TIO
N (
GR
A)
1,50
0
1,50
0
G
RO
UN
DW
AT
ER
FO
UN
DA
TIO
N10
0
10
0
IND
EP
EN
DE
NT
SP
EC
IAL
DIS
TR
ICT
S A
SS
OC
IAT
ION
(IS
DO
C)
50
50
PR
OF
ES
SIO
NA
L M
EM
BE
RS
HIP
S (
AS
CE
& W
EF
)50
0
50
0
S
AN
TA
AN
A R
IVE
R F
LOO
D P
RO
TE
CT
ION
AG
EN
CY
(S
AR
FP
A)
1,30
0
1,30
0
SO
UT
HE
RN
CA
LIF
OR
NIA
ALL
IAN
CE
OF
PU
BLI
CLY
OW
NE
D T
RE
AT
ME
NT
WO
RK
S3,
000
3,
000
SO
UT
HE
RN
CA
LIF
OR
NIA
SA
LIN
ITY
CO
ALI
TIO
N (
NW
RI)
10,0
00
10
,000
SO
UT
HE
RN
CA
LIF
OR
NIA
WA
TE
R C
OM
MIT
TE
E5,
000
5,
000
S
OU
TH
WE
ST
ME
MB
RA
NE
OP
ER
AT
OR
S A
SS
OC
IAT
ION
400
400
W
AT
ER
AD
VIS
OR
Y C
OM
MIT
TE
E O
F O
RA
NG
E C
OU
NT
Y (
WA
CO
)10
0
10
0
WA
TE
R E
DU
CA
TIO
N F
OU
ND
AT
ION
5,00
0
5,00
0
WA
TE
R R
ES
EA
RC
H F
OU
ND
AT
ION
165,
000
165,
000
CA
GR
OU
ND
WA
TE
R C
OA
LIT
ION
9,50
0
9,50
0
W
AT
ER
EU
SE
AS
SO
CIA
TIO
N15
,000
15,0
00
D
IST
RIC
T M
EM
BE
RS
HIP
S T
OT
AL
343,
525
-
-
-
-
-
343,
525
1010
.511
04S
UB
SC
RIP
TIO
NS
AD
MIN
IST
RA
TIV
E P
RO
FE
SS
ION
AL,
NE
WS
PA
PE
RS
80
0
80
0
S
UB
SC
RIP
TIO
NS
TO
TA
L80
0
-
-
-
-
-
80
0
1010
.511
12S
PE
CIA
L D
IST
RIC
T E
XP
EN
SE
S (
SP
ON
SO
RS
HIP
S)
SA
WP
A O
WO
W C
ON
FE
RE
NC
E5,
000
5,
000
O
RA
NG
E C
OU
NT
Y C
ON
SE
RV
AT
ION
CO
RP
S5,
000
5,
000
O
RA
NG
E C
OU
NT
Y S
CIE
NC
E F
AIR
3,00
0
3,00
0
HIS
TO
RY
OF
OR
AN
GE
10,0
00
10
,000
BS
MA
R17
2,00
0
2,00
0
CA
LIF
OR
NIA
WA
TE
RE
US
E C
ON
FE
RE
NC
E5,
500
5,
500
M
ISC
. SP
ON
SO
RS
HIP
S10
,000
10,0
00
S
PE
CIA
L D
IST
RIC
T E
XP
EN
SE
S (
SP
ON
SO
RS
HIP
S)
TO
TA
L40
,500
-
-
-
-
-
40,5
00
Tot
alJD
E A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
GE
NE
RA
L M
AN
AG
ER
'S O
FF
ICE
(10
10)
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-1
Des
crip
tion
9900
9987
1914
9977
9976
9922
AC
TIV
ITY
CO
DE
Gen
eral
Pos
eido
nP
FA
SN
.B. L
itigt
nS
.B. L
itigt
nG
WR
ST
otal
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
GE
NE
RA
L M
AN
AG
ER
'S O
FF
ICE
(10
10)
1010
.511
92T
EC
HN
ICA
L T
RA
ININ
GS
TA
FF
TR
AIN
ING
250
250
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L25
0
-
-
-
-
-
25
0
10
10.5
1301
TR
AV
EL/
CO
NF
ER
EN
CE
/MIL
EA
GE
A
CW
A S
PR
ING
CO
NF
ER
EN
CE
, MO
NT
ER
EY
, CA
1,50
0
1,50
0
AC
WA
FA
LL C
ON
FE
RE
NC
E, I
ND
IAN
WE
LLS
, CA
1,00
0
1,00
0
AM
WA
CO
NF
ER
EN
CE
, SA
N F
RA
NC
ISC
O, C
A1,
500
1,
500
SA
CR
AM
EN
TO
LE
GIS
LAT
IVE
TR
IPS
(6)
3,60
0
3,60
0
W
AS
HIN
GT
ON
DC
LE
GIS
LAT
IVE
TR
IPS
(4)
6,00
0
6,00
0
34
TH
AN
NU
AL
WA
TE
RE
US
E S
YM
PO
SIU
M, D
EN
VE
R, C
01,
500
1,
500
W
AT
ER
EU
SE
CA
LIF
OR
NIA
AN
NU
AL
CO
NF
ER
EN
CE
, SA
N F
RA
NC
ISC
O, C
A1,
500
1,
500
AM
ER
ICA
N W
AT
ER
SU
MM
IT, H
OU
ST
ON
, TX
1,50
0
1,50
0
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L18
,100
-
-
-
-
-
18,1
00
1010
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
LB
ULK
OF
FIC
E A
ND
CO
NS
UM
AB
LE S
UP
PLI
ES
5,00
0
5,00
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L5,
000
-
-
-
-
-
5,
000
1010
.515
31S
HIR
TS
- L
OG
O
SH
IRT
S -
LO
GO
300
300
SH
IRT
S -
LO
GO
TO
TA
L30
0
-
-
-
-
-
30
0
1010
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L
ST
AF
F L
EA
DE
RS
HIP
TR
AIN
ING
30,0
00
30
,000
MA
NA
GE
ME
NT
CO
NS
ULT
ING
39,5
00
39
,500
OR
GA
NIZ
AT
ION
AL
NE
ED
S A
SS
ES
SM
EN
T48
,000
48,0
00
P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L T
OT
AL
117,
500
-
-
-
-
-
117,
500
1010
.530
05P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
LE
GA
L
RU
TA
N &
TU
CK
ER
, LLP
400,
000
400,
000
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- L
EG
AL
TO
TA
L40
0,00
0
-
-
-
-
-
40
0,00
0
1010
.560
12IN
TE
RA
GE
NC
Y A
GR
EE
ME
NT
SA
CO
E W
AT
ER
CO
NS
ER
VA
TIO
N M
AIN
TE
NA
NC
E F
EE
103,
000
103,
000
LO
CA
L A
GE
NC
Y F
OR
MA
TO
N C
OM
MIS
SIO
N (
LAF
CO
)38
,000
38,0
00
NA
TIO
NA
L W
AT
ER
RE
SO
UR
CE
INS
TIT
UT
E (
NW
RI)
50,0
00
50
,000
OC
FC
D W
AT
ER
CO
NS
ER
VA
TIO
N M
AIN
TE
NA
NC
E F
EE
37,0
00
37
,000
SA
WP
A30
6,00
0
30
6,00
0
WA
TE
R E
ME
RG
EN
CY
RE
SP
ON
SE
OR
GA
NIZ
AT
ION
OF
OR
AN
GE
CO
UN
TY
(W
ER
OC
)95
,400
95,4
00
IN
TE
RA
GE
NC
Y A
GR
EE
ME
NT
S T
OT
AL
629,
400
-
-
-
-
-
629,
400
1010
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
EQ
UIP
ME
NT
RE
PA
IRS
100
100
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L10
0
-
-
-
-
-
10
0
GE
NE
RA
L M
AN
AG
ER
'S O
FF
ICE
GR
AN
D T
OT
AL
1,74
7,08
2
38,8
25
11
6,47
4
38
,825
38,8
25
77
,649
2,05
7,68
0
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-2
Des
crip
tion
Gen
eral
Y
outh
Edu
catio
n W
ater
Her
o P
rogr
am
Wat
erS
umm
it W
ater
101
T
ours
AC
TIV
ITY
CO
DE
9900
1206
9926
9959
9962
9963
SA
LAR
IES
& B
EN
EF
ITS
1012
.501
04R
EG
ULA
R S
ALA
RIE
S67
4,00
2
53,8
43
93
4
24,8
98
10
8,27
8
77,3
11
93
9,26
6
1012
.502
10P
AY
RO
LL T
AX
ES
13,6
58
78
1
14
36
1
1,57
0
1,
121
17,5
04
1012
.502
02R
ET
IRE
ME
NT
101,
789
8,
965
155
4,
146
18,0
28
12
,872
145,
955
1012
.502
04H
EA
LTH
INS
UR
AN
CE
90,9
17
9,
084
134
3,
562
16,2
18
12
,523
132,
438
1012
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N4,
097
323
6
14
9
650
46
4
5,68
8
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
884,
462
72
,995
1,24
2
33
,116
144,
744
10
4,29
2
1,24
0,85
1
1012
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
W
AS
HIN
GT
ON
D.C
. - 2
-3 T
RIP
S4,
500
4,50
0
A
CW
A C
ON
F (
SP
RIN
G A
ND
FA
LL; 2
ST
AF
F)
3,80
0
3,
800
LO
CA
L O
NE
-DA
Y C
ON
FE
RE
NC
ES
(10
)(O
FF
SIT
E &
WE
BIN
AR
S)
2,25
0
2,
250
S
AC
RA
ME
NT
O (
14)
(AC
WA
/WR
A L
EG
CO
MM
ITT
EE
& C
OM
MU
NIC
AT
ION
S C
OM
MIT
TE
E)
6,50
0
6,
500
MIS
CE
LLA
NE
OU
S T
RA
VE
L E
XP
EN
SE
S (
MIL
EA
GE
)4,
000
4,00
0
WA
TE
RE
US
E C
A C
ON
FE
RE
NC
ES
(2
ST
AF
F)
4,00
0
4,
000
PR
SA
CO
NF
ER
EN
CE
(O
CT
. 201
9 -
SA
N D
IEG
O)
(RE
G. E
AR
LY B
IRD
PE
R P
ER
SO
N $
1,25
0)3,
500
3,50
0
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L28
,550
-
-
-
-
-
28,5
50
10
12.5
1305
PU
BLI
C IN
FO
RM
AT
ION
TO
UR
S
PU
BLI
C T
OU
RS
& G
RO
UN
DW
AT
ER
AD
VE
NT
UR
E T
OU
R
2,00
0
13
,000
15
,000
NE
XT
GE
NE
RA
TIO
N W
AT
ER
LE
AD
ER
S -
INS
IDE
TH
E O
UT
DO
OR
S/K
W C
OM
MU
NIC
AT
ION
S &
SU
BS
IDIZ
ED
BU
S F
UN
DIN
G11
,000
11
,000
SP
EA
KE
RS
BU
RE
AU
2,
000
2,00
0
P
UB
LIC
INF
OR
MA
TIO
N T
OU
RS
TO
TA
L-
15
,000
-
-
-
13,0
00
28
,000
1012
.512
04M
ISC
ELL
AN
EO
US
EX
PE
NS
E
LEG
ISLA
TIV
E &
PR
OD
UC
ER
AC
TIV
ITIE
S
2,50
0
2,
500
M
ISC
EL
LA
NE
OU
S E
XP
EN
SE
TO
TA
L2,
500
-
-
-
-
-
2,50
0
1012
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
LE
NS
RE
SO
UR
CE
S (
FE
DE
RA
L A
DV
OC
AC
Y)
92,0
00
92
,000
JAM
ES
F. M
CC
ON
NE
LL (
FE
DE
RA
L A
DV
OC
AC
Y)
92,0
00
92
,000
HO
LLA
ND
& K
NIG
HT
(F
ED
ER
AL
AD
VO
CA
CY
)92
,000
92,0
00
E
DE
LST
EIN
, GIL
BE
RT
, SM
ITH
& R
OB
SO
N (
ST
AT
E A
DV
OC
AC
Y)
92,0
00
92
,000
GO
NS
ALV
ES
& S
ON
(S
TA
TE
AD
VO
CA
CY
)92
,000
92,0
00
LI
BR
IS O
NLI
NE
PH
OT
O A
ND
VID
EO
LIB
RA
RY
LIC
EN
SE
5,50
0
5,
500
SO
CIA
L M
ED
IA W
AT
ER
MO
SA
IC -
HA
LLW
AY
3,50
0
3,
500
LIC
EN
SIN
G, T
EC
H S
UP
PO
RT
AN
D M
AIN
TE
NA
NC
E F
OR
H2O
LE
AR
NIN
G C
EN
TE
R H
ALL
WA
Y
7,50
0
7,
500
P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L T
OT
AL
465,
500
-
-
-
-
11
,000
476,
500
10
12.5
1501
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
A
WA
RD
S (
SU
BM
ITT
ALS
)1,
500
1,50
0
P
HO
TO
GR
AP
HY
SE
RV
ICE
S &
EQ
UIP
ME
NT
(U
PD
AT
E/P
ICK
-UP
SH
OT
S-
VID
EO
& A
CT
ION
PH
OT
OS
)1,
000
1,00
0
M
ED
IA A
CT
IVIT
IES
(M
ELT
WA
TE
R; W
EE
KLY
WA
TE
R L
INE
S F
EE
D)
21,0
00
21
,000
LIC
EN
SIN
G T
O P
OS
T/R
EP
RIN
T A
RT
ICLE
S1,
000
1,00
0
O
FF
ICE
EX
PE
NS
ES
SU
PP
LIE
S, P
RIN
TIN
G E
TC
.15
,000
15,0
00
F
LYE
R D
IST
RIB
UT
ION
& M
AIL
ING
S (
WA
LKIN
G M
AN
/PO
ST
AG
E)
- C
ON
ST
RU
CT
ION
CO
MM
. - N
OT
ALW
AY
S C
OV
ER
ED
INP
RO
JEC
T B
UD
GE
TS
2,
500
2,50
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L42
,000
-
-
-
-
-
42
,000
JDE
Acc
ount
N
umbe
rT
otal
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PU
BLI
C A
FF
AIR
S (
1012
)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
FY 2
020-
21 B
udge
t Rep
ort
Des
crip
tion
Gen
eral
Y
outh
Edu
catio
n W
ater
Her
o P
rogr
am
Wat
erS
umm
it W
ater
101
T
ours
AC
TIV
ITY
CO
DE
9900
1206
9926
9959
9962
9963
JDE
Acc
ount
N
umbe
rT
otal
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PU
BLI
C A
FF
AIR
S (
1012
)
1012
.511
02M
EM
BE
RS
HIP
P
RO
FE
SS
ION
AL
ME
MB
ER
SH
IPS
(P
RS
A -
NA
TIO
NA
L A
ND
OR
AN
GE
CO
UN
TY
CH
AP
TE
RS
)
1,40
0
1,
400
M
EM
BE
RS
HIP
TO
TA
L1,
400
-
-
-
-
-
1,
400
1012
.511
92T
EC
HN
ICA
L T
RA
ININ
GP
RO
FE
SS
ION
AL
DE
VE
LOP
ME
NT
1,
000
1,00
0
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L1,
000
-
-
-
-
-
1,
000
1012
.560
12G
WR
S
GW
RS
GR
OU
P T
OU
RS
9,
000
9,00
0
GW
RS
BO
TT
LED
WA
TE
R (
BO
TT
LIN
G &
SH
IPP
ING
)18
,000
18,0
00
MA
RK
ET
ING
/OU
TR
EA
CH
GW
RS
OV
ER
ALL
PR
OJE
CT
, BO
TT
LED
WA
TE
R &
TO
UR
S
7,00
0
3,
000
10,0
00
GW
RS
CO
LLA
TE
RA
L (B
AG
S, P
EN
S, 2
4-P
AG
E T
EC
H B
RO
CH
UR
E, O
TH
ER
HA
ND
OU
TS
)
10,0
00
20
,000
30,0
00
G
WR
S T
OT
AL
9,00
0
-
-
-
35,0
00
23,0
00
67,0
00
10
12.5
1112
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E
OC
WD
BR
OC
HU
RE
S, F
OLD
ER
S &
FA
CT
SH
EE
TS
16
,500
16,5
00
E
MP
LOY
EE
EV
EN
TS
15
,000
15,0
00
MA
RK
ET
ING
- O
CW
D'S
RO
LE IN
OC
(W
ITH
SO
CIA
L M
ED
IA E
MP
HA
SIS
) 10
,000
10,0
00
VIR
TU
AL
TO
UR
S (
360
GW
RS
, LA
B, F
HQ
& W
ET
LAN
DS
) &
OT
HE
R V
IDE
OS
10,0
00
10
,000
GR
OU
ND
BR
EA
KIN
GS
, DE
DIC
AT
ION
S, C
OM
MU
NIT
Y C
ON
ST
RU
CT
ION
ME
ET
ING
S
5,00
0
5,
000
BO
AR
D R
OO
M P
HO
TO
S &
UP
DA
TE
FR
AM
ED
DIS
TR
ICT
MA
PS
AN
D P
HO
TO
S F
OR
CO
NF
ER
EN
CE
RO
OM
S A
S N
EE
DE
D1,
500
1,50
0
S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
TO
TA
L48
,000
-
-
-
-
10,0
00
58,0
00
10
12.5
1119
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E -
OC
WA
TE
R S
UM
MIT
OC
WA
TE
R S
UM
MIT
- O
PE
RA
TIN
G C
OS
TS
76,0
00
76
,000
W
AT
ER
AD
VIS
OR
Y C
OM
MIT
TE
E O
F O
RA
NG
E C
OU
NT
Y6,
000
6,00
0
S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
- O
C W
AT
ER
SU
MM
IT T
OT
AL
6,00
0
-
-
76
,000
-
-
82
,000
MIS
CE
LLA
NE
OU
S R
EIM
BU
RS
EM
EN
T -
OC
WA
TE
R S
UM
MIT
1012
.511
19.1
70M
WD
OC
RE
IMB
UR
SE
ME
NT
(S
UM
MIT
AN
D W
AC
O)
(3,0
00)
(3,0
00)
(6,0
00)
1012
.511
19.2
50O
C W
AT
ER
SU
MM
IT -
SP
ON
SO
R R
EIM
BU
RS
EM
EN
T &
RE
GIS
TR
AT
ION
S(7
0,00
0)
(70,
000)
MIS
CE
LL
AN
EO
US
RE
IMB
UR
SE
ME
NT
- O
C W
AT
ER
SU
MM
IT T
OT
AL
(3,0
00)
-
-
(73,
000)
-
-
(7
6,00
0)
1012
.511
16S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
- C
WE
F
CH
ILD
RE
N'S
FE
ST
IVA
L
235,
000
23
5,00
0
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E -
CW
F T
OT
AL
-
235,
000
-
-
-
-
235,
000
10
12.5
1116
.250
MIS
CE
LLA
NE
OU
S R
EIM
BU
RS
EM
EN
T -
CW
EF
CH
ILD
RE
N'S
FE
ST
IVA
L (S
PO
NS
OR
S)
(70,
000)
(7
0,00
0)
M
ISC
EL
LA
NE
OU
S R
EIM
BU
RS
EM
EN
T -
CW
F T
OT
AL
-
(70,
000)
-
-
-
-
(7
0,00
0)
PU
BL
IC A
FF
AIR
S G
RA
ND
TO
TA
L1,
485,
412
252,
995
1,
242
36,1
16
17
9,74
4
161,
292
2,
116,
801
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
FY 2
020-
21 B
udge
t Rep
ort
Des
crip
tion
Gen
eral
GW
RS
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1016
.501
04R
EG
ULA
R S
ALA
RIE
S88
8,09
9
437,
422
1,
325,
521
1016
.502
10P
AY
RO
LL T
AX
ES
13,7
95
6,
795
20
,590
1016
.502
02R
ET
IRE
ME
NT
145,
403
71
,616
217,
020
10
16.5
0204
HE
ALT
H IN
SU
RA
NC
E12
3,71
3
60,9
33
18
4,64
7
1016
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N5,
329
2,
625
7,
953
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L1,
176,
339
579,
391
1,
755,
730
1016
.525
01C
OM
MU
NIC
AT
ION
C
ELL
ULA
R T
ELE
PH
ON
E &
WIR
ELE
SS
SE
RV
ICE
S51
,000
51,0
00
P
HO
NE
SE
RV
ICE
(P
HY
SIC
AL
CIR
CU
ITS
, DID
LIN
ES
, LO
NG
DIS
TA
NC
E, E
TC
.)88
,000
88,0
00
R
EP
LAC
EM
EN
T P
HO
NE
S3,
500
3,
500
IN
TE
RN
ET
DA
TA
CO
MM
UN
ICA
TIO
NS
- F
OU
NT
AIN
VA
LLE
Y, A
NA
HE
IM, O
RA
NG
E, P
RA
DO
50,0
00
50
,000
MIS
CE
LLA
NE
OU
S C
OM
MU
NIC
AT
ION
S5,
000
5,
000
C
OM
MU
NIC
AT
ION
TO
TA
L19
7,50
0
-
197,
500
1016
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
EC
ON
FE
RE
NC
E/T
RA
ININ
G T
RA
VE
L (M
ISA
C /
TE
CH
NIC
AL
CO
NF
ER
EN
CE
S)
5,00
0
5,00
0
M
ILE
AG
E (
FIE
LD H
Q, P
RA
DO
)50
0
50
0
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
5,50
0
-
5,50
0
1016
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
GE
NE
RA
L O
FF
ICE
EX
PE
NS
E (
SH
IPP
ING
, FE
DE
X)
2,00
0
2,00
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L2,
000
-
2,
000
10
16.5
1510
HA
RD
WA
RE
/SO
FT
WA
RE
HA
RD
WA
RE
& S
OF
TW
AR
E P
UR
CH
AS
ES
FO
R D
EP
TS
, PR
OG
RA
MM
ER
TO
OLS
FO
R IS
35,0
00
35,0
00
CO
MP
UT
ER
RE
PLA
CE
ME
NT
S A
ND
LA
PT
OP
S -
QT
Y 2
537
,500
37
,500
OF
FIC
E 3
65 G
OV
ER
NM
EN
T G
3 LI
CE
NS
ING
FO
R E
MP
LOY
EE
S (
285
LIC
EN
SE
S)
65,0
00
65,0
00
AD
VA
NC
E S
EC
UR
ITY
SE
RV
ICE
S F
OR
OF
FIC
E 3
6512
,000
12
,000
NE
TW
OR
K S
EC
UR
ITY
SE
RV
ICE
S50
,000
50
,000
PH
ON
E S
YS
TE
M C
ALL
AC
CO
UN
TIN
G S
OF
TW
AR
E U
PD
AT
E5,
000
5,
000
MIC
RO
SO
FT
AZ
UR
E S
ER
VIC
ES
(W
EB
SIT
ES
, VIR
TU
AL
SE
RV
ER
S &
RE
LAT
ED
SE
RV
ICE
S)
15,0
00
15,0
00
CO
MP
UT
ER
UP
GR
AD
E H
AR
DW
AR
E (
DR
IVE
S A
ND
ME
MO
RY
)2,
000
2,
000
DA
TA
CE
NT
ER
EQ
UIP
ME
NT
/ R
AC
KS
, RA
ILS
, PO
WE
R S
UP
PLI
ES
10,0
00
10,0
00
SIN
GLE
MO
DE
FIB
ER
TO
LA
BO
RA
TO
RY
BU
ILD
ING
& C
AB
LIN
G T
O F
V A
NN
EX
BU
ILD
ING
15,0
00
15,0
00
TA
PE
S, S
TO
RA
GE
ME
DIA
, OF
FS
ITE
& O
TH
ER
DA
TA
SE
RV
ICE
S15
,000
15
,000
RE
PLA
CE
ME
NT
BA
TT
ER
IES
FO
R D
AT
A C
EN
TE
R P
OW
ER
SU
PP
LY (
UP
S)
8,00
0
8,00
0
PR
INT
ER
S (
RE
PLA
CE
ME
NT
AN
D N
ET
WO
RK
PR
INT
ER
S)
3,00
0
3,00
0
HA
RD
WA
RE
/SO
FT
WA
RE
TO
TA
L27
2,50
0
-
272,
500
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
INF
OR
MA
TIO
N S
ER
VIC
ES
(10
16)
JDE
Acc
ount
N
umbe
rT
otal
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-5
Des
crip
tion
Gen
eral
GW
RS
AC
TIV
ITY
CO
DE
9900
9922
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
INF
OR
MA
TIO
N S
ER
VIC
ES
(10
16)
JDE
Acc
ount
N
umbe
rT
otal
1016
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
M
AIN
TE
NA
NC
E A
GR
EE
ME
NT
S F
OR
EX
IST
ING
HW
& S
W35
6,00
0
35
6,00
0
M
AIN
TE
NA
NC
E A
GR
EE
ME
NT
S F
OR
NE
W H
W &
SW
5,00
0
5,00
0
SU
PP
OR
T F
OR
BO
AR
DR
OO
M/C
ON
F R
OO
M A
UD
IOV
ISU
AL
EQ
UIP
(1
YE
AR
)25
,000
25,0
00
R
EP
AIR
EX
IST
ING
AU
DIO
VIS
UA
L E
QU
IPM
EN
T5,
000
5,
000
ON
-CA
LL S
ER
VIC
E A
GR
EE
ME
NT
FO
R H
ALL
WA
Y L
EA
RN
ING
CE
NT
ER
EQ
UIP
ME
NT
8,00
0
8,00
0
R
EP
AIR
EX
IST
ING
CA
BLI
NG
(N
ET
WO
RK
, TE
LEP
HO
NE
, CO
PP
ER
, ET
C.)
5,00
0
5,00
0
RE
PA
IR E
XIS
TIN
G E
QU
IPM
EN
T (
WO
RK
ST
AT
ION
S, P
RIN
TE
RS
, E
TC
.)10
,000
10,0
00
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
414,
000
-
41
4,00
0
1016
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
ON
-CA
LL C
ON
SU
LTIN
G (
JD E
DW
AR
DS
, MA
XIM
O, W
RM
S, S
EC
UR
ITY
, NE
TW
OR
K,
DO
CU
ME
NT
AT
ION
)60
,000
60
,000
P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
TO
TA
L60
,000
-
60,0
00
10
16.5
1102
ME
MB
ER
SH
IP
U
SE
R G
RO
UP
ME
MB
ER
SH
IP50
0
50
0
M
EM
BE
RS
HIP
TO
TA
L50
0
-
50
0
10
16.5
1192
TE
CH
NIC
AL
TR
AIN
ING
O
NG
OIN
G T
EC
HN
ICA
L T
RA
ININ
G F
OR
IS D
EP
AR
TM
EN
T10
,000
10,0
00
TR
AIN
ING
FO
R O
TH
ER
DE
PA
RT
ME
NT
S7,
000
7,
000
O
RA
CLE
JD
ED
WA
RD
S T
RA
ININ
G/IB
M M
AX
IMO
TR
AIN
ING
10,0
00
10
,000
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L27
,000
-
27,0
00
INF
OR
MA
TIO
N S
ER
VIC
ES
GR
AN
D T
OT
AL
2,15
5,33
9
57
9,39
1
2,73
4,73
0
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-6
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1018
.501
04R
EG
ULA
R S
ALA
RIE
S41
1,32
4
10
2,83
1
51
4,15
5
1018
.501
18D
IRE
CT
OR
S' F
EE
S34
2,00
0
34
2,00
0
1018
.502
10P
AY
RO
LL T
AX
ES
10,9
23
1,49
1
12
,414
10
18.5
0202
RE
TIR
EM
EN
T12
5,42
8
17,1
21
142,
550
1018
.502
04H
EA
LTH
INS
UR
AN
CE
255,
198
21,5
15
276,
713
10
18.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
4,52
0
617
5,13
7
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
1,14
9,39
3
143,
575
1,29
2,96
8
1018
.513
01B
OA
RD
TR
AV
EL/
CO
NF
ER
EN
CE
/MIL
EA
GE
A
CW
A, A
WW
A, A
DA
, NW
RA
, AS
CE
, CR
WU
A, O
CC
OG
, WA
TE
RE
US
E, A
ND
MIS
C.
CO
NF
ER
EN
CE
S40
,000
40
,000
B
OA
RD
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L40
,000
-
40,0
00
1018
.510
12LE
GA
L A
DV
ER
TIS
ING
LE
GA
LLY
RE
QU
IRE
D N
OT
ICE
S A
ND
RE
PO
RT
S, I
.E. P
UB
LIC
HE
AR
ING
S, E
TC
.3,
000
3,
000
L
EG
AL
AD
VE
RT
ISIN
G T
OT
AL
3,00
0
-
3,
000
1018
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
BO
AR
DR
OO
M S
UP
PLI
ES
, RE
FR
ES
HM
EN
TS
FO
R B
OA
RD
AN
D C
OM
MIT
TE
ES
53,0
00
53,0
00
F
ED
EX
500
500
MIN
UT
E M
AN
1,00
0
1,00
0
MA
IL D
ISP
AT
CH
4,50
0
4,50
0
PO
ST
AG
E20
,000
20
,000
F
ILIN
G F
EE
S10
0
10
0
NO
TA
RY
SU
PP
LIE
S20
0
20
0
O
FF
ICE
SU
PP
LIE
S1,
000
1,
000
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
80,3
00
-
80
,300
T
otal
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
BO
AR
D A
DM
INIS
TR
AT
ION
(10
18)
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-7
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
Tot
alJD
E A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
BO
AR
D A
DM
INIS
TR
AT
ION
(10
18)
1018
.515
65R
EN
T E
QU
IPM
EN
T -
GE
NE
RA
L
X
ER
OX
E-1
105
& E
-554
0CT
CO
PY
MA
CH
INE
S L
EA
SE
(M
AIN
CO
PY
RO
OM
)20
,000
20
,000
C
OP
Y C
EN
TE
R C
35 (
MA
IN C
OP
Y R
OO
M)
500
50
0
C
OP
Y C
EN
TE
R C
35 (
SM
CO
PY
RO
OM
)50
0
500
DC
420A
C C
OP
IER
(F
HQ
)50
0
500
D
C42
0AC
CO
PIE
R (
LAB
/MA
INT
)50
0
500
DC
420A
C C
OP
IER
(O
PE
RA
TIO
NS
)50
0
500
D
C53
5H C
OP
IER
(LA
RG
E C
OP
Y R
OO
M)
500
50
0
D
C53
5H C
OP
IER
(A
NN
EX
)50
0
500
DC
535H
CO
PIE
R (
WA
TE
R P
RO
DU
CT
ION
)50
0
500
MA
KE
RE
AD
Y S
OF
TW
AR
E6,
000
6,00
0
SC
AN
NE
R2,
500
2,50
0
DC
535H
CO
PIE
R (
LAB
)50
0
500
N
EO
PO
ST
PO
ST
AG
E M
AC
HIN
E8,
000
8,00
0
RE
NT
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L41
,000
-
41,0
00
10
18.5
1192
ED
UC
AT
ION
AL
TR
AIN
ING
AR
MA
TR
AIN
ING
AN
D S
EM
INA
RS
300
300
ED
UC
AT
ION
AL
TR
AIN
ING
TO
TA
L30
0
-
300
1018
.511
02M
EM
BE
RS
HIP
AS
SO
CIA
TIO
N O
F R
EC
OR
DS
MA
NA
GE
RS
& A
DM
INIS
TR
AT
OR
S (
1)21
5
21
5
NA
TIO
NA
L N
OT
AR
Y A
SS
OC
IAT
ION
(2)
225
225
ME
MB
ER
SH
IP T
OT
AL
440
-
44
0
1018
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
DO
CU
ME
NT
AR
CH
IVA
L A
ND
SC
AN
NIN
G5,
000
5,
000
O
FF
SIT
E S
TO
RA
GE
35,0
00
35,0
00
S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
TO
TA
L40
,000
-
40,0
00
1018
.510
42E
LEC
TIO
N C
OS
TS
A
CC
RU
ED
ELE
CT
ION
CO
ST
S13
3,00
0
13
3,00
0
EL
EC
TIO
N C
OS
TS
TO
TA
L13
3,00
0
-
133,
000
B
OA
RD
AD
MIN
IST
RA
TIO
N G
RA
ND
TO
TA
L1,
487,
433
14
3,57
5
1,
631,
008
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-8
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1022
.501
04R
EG
ULA
R S
ALA
RIE
S41
0,19
2
102,
548
51
2,74
1
1022
.502
10P
AY
RO
LL T
AX
ES
5,94
8
1,
487
7,43
5
10
22.5
0202
RE
TIR
EM
EN
T68
,297
17
,074
85
,371
10
22.5
0204
HE
ALT
H IN
SU
RA
NC
E76
,298
19
,075
95
,373
10
22.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
4,64
4
1,
161
5,80
5
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L56
5,37
9
141,
345
70
6,72
4
10
22.5
1501
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
SA
FE
TY
SIG
NS
/HA
RD
WA
RE
FO
R W
AR
EH
OU
SE
400
40
0
M
ISC
ELL
AN
EO
US
SU
PP
LIE
S (
TO
NE
RS
, DR
UM
S, F
ILIN
G S
UP
PLI
ES
)7,
500
7,50
0
S
HIP
PIN
G S
UP
PLI
ES
(S
HR
INK
WR
AP
/TA
PE
, BIN
DIN
G, E
TC
.)1,
500
1,50
0
P
AP
ER
RE
CY
CLI
NG
2,50
0
2,
500
UP
S S
HIP
PIN
G F
EE
S2,
500
2,50
0
T
RU
CK
WA
SH
FO
R D
IST
RIC
T V
EH
ICLE
S -
PR
AD
O, F
HQ
AN
D F
V2,
500
2,50
0
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
16,9
00
-
16,9
00
1022
.515
20G
AS
& D
IES
EL
V
EH
ICLE
FU
EL
500
50
0
GA
S &
DIE
SE
L T
OT
AL
500
-
50
0
1022
.515
31S
HIR
TS
- L
OG
O
SH
IRT
S -
LO
GO
/SH
IRT
S/J
AC
KE
TS
300
30
0
SH
IRT
S -
LO
GO
TO
TA
L30
0
-
300
1022
.515
45S
MA
LL T
OO
LSM
ISC
ELL
AN
EO
US
HA
ND
TO
OLS
500
50
0
SM
AL
L T
OO
LS
TO
TA
L50
0
-
500
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PU
RC
HA
SIN
G (
1022
)
Tot
al
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-9
FY 2
020-
21 B
udge
t Rep
ort
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PU
RC
HA
SIN
G (
1022
)
Tot
al
1022
.511
02M
EM
BE
RS
HIP
P
UR
CH
AS
ING
(C
ALI
FO
RN
IA A
SS
OC
IAT
ION
OF
PU
BLI
C
PU
RC
HA
SIN
G O
FF
ICE
RS
, IN
C. A
ND
NA
TIO
NA
L A
SS
OC
IAT
ION
O
F P
UR
CH
AS
ING
MA
NA
GE
ME
NT
)1 M
EM
BE
RS
HIP
30
0
300
M
EM
BE
RS
HIP
TO
TA
L30
0
-
300
1022
.511
92T
EC
HN
ICA
L T
RA
ININ
G
PU
RC
HA
SIN
G S
EM
INA
RS
(IN
SU
RA
NC
E A
ND
NE
GO
TIA
TIO
N)
500
50
0
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L50
0
-
500
1022
.516
30IN
VE
NT
OR
Y F
RE
IGH
TD
ELI
VE
RY
FE
ES
AN
D F
RE
IGH
T C
HA
RG
ES
25,0
00
25,0
00
INV
EN
TO
RY
FR
EIG
HT
TO
TA
L25
,000
-
25
,000
1022
.570
16M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
T -
GE
NE
RA
LW
AR
EH
OU
SE
MA
INT
EN
AN
CE
- A
DD
ITIO
NA
L S
HE
LVIN
G/R
AC
KIN
G &
FLO
OR
RE
FU
RB
.2,
500
2,50
0
M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
T -
GE
NE
RA
L T
OT
AL
2,50
0
-
2,
500
P
UR
CH
AS
ING
GR
AN
D T
OT
AL
611,
879
14
1,34
5
753,
224
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
0FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1024
.501
04R
EG
ULA
R S
ALA
RIE
S1,
171,
379
29
2,84
5
1,
464,
223
10
24.5
0210
PA
YR
OLL
TA
XE
S18
,919
4,
730
23,6
49
1024
.502
02R
ET
IRE
ME
NT
189,
840
47,4
60
237,
300
1024
.502
04H
EA
LTH
INS
UR
AN
CE
196,
471
49,1
18
245,
589
1024
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N7,
078
1,76
9
8,
847
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
1,58
3,68
7
395,
922
1,97
9,60
8
1024
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
ES
PE
CIA
L D
IST
RIC
T F
INA
NC
IAL
MA
NA
GE
ME
NT
CO
NF
ER
EN
CE
- S
O C
ALI
FO
RN
IA50
0
500
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
500
-
500
10
24.5
3001
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
E
XT
ER
NA
L A
UD
IT (
SIN
GLE
AU
DIT
/ M
PP
INC
LUD
ED
)55
,000
55
,000
P
AY
RO
LL O
UT
SO
UR
CIN
G60
,000
60
,000
S
PE
CIA
LIZ
ED
AC
CO
UN
TIN
G/F
INA
NC
IAL
SE
RV
ICE
S
30,0
00
30,0
00
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
TO
TA
L14
5,00
0
-
145,
000
1024
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
CH
EC
K S
TO
CK
FO
R A
/P -
SA
FE
CH
EC
KS
1,00
0
1,
000
CO
LOR
CO
PY
ALL
OC
AT
ION
1,
000
1,00
0
CO
LOR
PR
INT
ING
CH
AR
GE
FO
R C
AF
R A
ND
BU
DG
ET
BO
OK
2,
000
2,00
0
F
ED
EX
2,
000
2,00
0
M
ICR
TO
NE
R -
A/P
, P/R
1,
000
1,00
0
CO
MP
RE
HE
NS
IVE
AN
NU
AL
FIN
AN
CIA
L R
EP
OR
T A
PP
LIC
AT
ION
1,00
0
1,
000
M
ISC
ELL
AN
EO
US
SU
PP
LIE
S (
CO
MP
UT
ER
PA
PE
R, T
ON
ER
, OF
FIC
E S
UP
PLI
ES
)11
,900
11
,900
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
19,9
00
-
19
,900
1024
.511
04S
UB
SC
RIP
TIO
NS
GA
SB
/GA
AP
-AC
CO
UN
TIN
G J
OU
RN
AL
500
50
0
SU
BS
CR
IPT
ION
S T
OT
AL
500
-
500
1024
.515
20G
AS
& D
IES
EL
FU
EL
SC
FU
EL
@ $
420
MO
AV
ER
AG
E
5,00
0
5,
000
GA
S &
DIE
SE
L F
UE
L T
OT
AL
5,00
0
-
5,00
0
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
FIN
AN
CE
(10
24)
Tot
al
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-11
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
FIN
AN
CE
(10
24)
Tot
al
1024
.515
30U
NIF
OR
MS
& S
AF
ET
Y
OV
ER
ALL
- U
NIF
OR
MS
20
0
200
U
NIF
OR
MS
& S
AF
ET
Y T
OT
AL
200
-
200
10
24.5
1102
ME
MB
ER
SH
IPA
ME
RIC
AN
INS
TIT
UT
E O
F C
ER
TIF
IED
PU
BLI
C A
CC
OU
NT
AN
TS
1,00
0
1,
000
INS
TIT
UT
E O
F M
AN
AG
EM
EN
T A
CC
OU
NT
AN
TS
300
30
0
CA
LIF
OR
NIA
MU
NIC
IPA
L T
RE
AS
UR
ER
S A
SS
OC
IAT
ION
300
30
0
C
PA
LIC
EN
SE
, CA
L C
PA
ME
MB
ER
SH
IP(V
S, D
S, M
O)
1,20
0
1,
200
C
ALI
FO
RN
IA S
OC
IET
Y O
F M
UN
ICIP
AL
FIN
AN
CE
OF
FIC
ER
S30
0
300
GO
VE
RN
ME
NT
FIN
AN
CE
OF
FIC
ER
S A
SS
OC
IAT
ION
300
30
0
ME
MB
ER
SH
IP T
OT
AL
3,40
0
-
3,40
0
10
24.5
1192
TE
CH
NIC
AL
TR
AIN
ING
D
IEH
L E
VA
NS
TA
X L
AW
CH
AN
GE
S S
EM
INA
R (
2 S
TA
FF
)1,
000
1,00
0
JD
E T
rain
ing
20,0
00
20,0
00
CA
L C
PA
CP
E T
EC
HN
ICA
L T
RA
ININ
G (
VS
, DS
, MO
)3,
000
3,00
0
T
EC
HN
ICA
L T
RA
ININ
G T
OT
AL
24,0
00
-
24
,000
1024
.560
23P
UR
CH
AS
E D
ISC
OU
NT
S
PU
RC
HA
SE
DIS
CO
UN
TS
(60,
000)
(60,
000)
PU
RC
HA
SE
DIS
CO
UN
TS
TO
TA
L(6
0,00
0)
-
(60,
000)
1024
.560
24R
EB
AT
ES
- P
UR
CH
AS
ING
CA
RD
R
EB
AT
ES
- P
UR
CH
AS
ING
CA
RD
(20,
000)
(20,
000)
RE
BA
TE
S -
PU
RC
HA
SIN
G C
AR
D T
OT
AL
(20,
000)
-
(2
0,00
0)
1024
.560
28B
AN
K C
HA
RG
ES
BA
NK
CH
AR
GE
S (
$2,0
00 A
VE
RA
GE
/MO
)24
,000
24
,000
B
AN
K C
HA
RG
ES
TO
TA
L24
,000
-
24,0
00
F
INA
NC
E G
RA
ND
TO
TA
L
1,72
6,18
7
39
5,92
2
2,12
2,10
8
O
rang
e C
ount
y W
ater
Dis
tric
tFY
202
0-21
Bud
get R
epor
t11
-12
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
10
30.5
0104
RE
GU
LAR
SA
LAR
IES
434,
474
92,1
92
526,
666
10
30.5
0210
PA
YR
OLL
TA
XE
S6,
300
1,33
7
7,
637
1030
.502
02R
ET
IRE
ME
NT
72,3
40
15,3
50
87,6
90
10
30.5
0204
HE
ALT
H IN
SU
RA
NC
E86
,033
18
,294
10
4,32
7
1030
.502
05H
EA
LTH
INS
UR
AN
CE
- R
ET
IRE
E P
RE
MIU
MS
16,5
00
16,5
00
10
30.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
2,60
7
55
3
3,16
0
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L61
8,25
4
12
7,72
5
74
5,98
0
1030
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
A
CW
A/J
PIA
CO
MM
ITT
EE
/AC
WA
/JP
IA P
ER
SO
NN
EL
CO
MM
ITT
EE
M
EE
TIN
GS
(4
TR
IPS
)50
0
500
CA
LPE
LRA
CO
NF
ER
EN
CE
(M
ON
TE
RE
Y, C
A)
& S
EM
INA
RS
2,50
0
2,
500
M
ILE
AG
E10
0
100
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
3,10
0
-
3,10
0
10
30.5
3001
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
LIF
EW
OR
KS
EM
PLO
YE
E A
SS
IST
AN
CE
PR
OG
RA
M6,
500
6,50
0
H
EA
LTH
AN
D W
ELL
NE
SS
(F
AIR
AN
D A
CT
IVIT
IES
)1,
000
1,00
0
UN
IVE
RS
AL
BA
CK
GR
OU
ND
INV
ES
TIG
AT
ION
5,00
0
5,
000
ALL
IAN
T B
RO
KE
R S
ER
VIC
ES
FE
E25
,000
25
,000
PE
RS
ON
NE
L IS
SU
ES
- L
EG
AL
FE
ES
10,0
00
10,0
00
R
ET
IRE
E M
ED
ICA
L A
CT
UA
RIA
L F
EE
S15
,000
15
,000
RE
TIR
EM
EN
T P
LAN
FE
ES
(P
AR
TIC
IPA
NT
INIT
IAT
ED
TR
AN
SA
CT
ION
S)
1,00
0
1,
000
RE
TIR
EM
EN
T P
LAN
LE
GA
L C
ON
SU
LTIN
G A
ND
PLA
N F
ILIN
GS
6,00
0
6,
000
P
RE
-EM
PLO
YM
EN
T P
HY
SIC
AL
S10
,000
10
,000
SH
EA
KLE
Y F
EE
S15
0
150
P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L T
OT
AL
79,6
50
-
79
,650
1030
.530
15T
EM
PO
RA
RY
LA
BO
R -
GE
NE
RA
LT
EM
PO
RA
RY
LA
BO
R -
MIS
C. D
EP
AR
TM
EN
TS
50,0
00
50,0
00
T
EM
PO
RA
RY
LA
BO
R -
GE
NE
RA
L T
OT
AL
50,0
00
-
50
,000
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
HU
MA
N R
ES
OU
RC
ES
(10
30)
Tot
al
O
rang
e C
ount
y W
ater
Dis
tric
t11
-13
FY 2
020-
21 B
udge
t Rep
ort
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
HU
MA
N R
ES
OU
RC
ES
(10
30)
Tot
al
1030
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
AR
OM
A M
AC
HIN
E S
UP
PLI
ES
AN
D M
AIN
TE
NA
NC
E50
0
500
E
MP
LOY
ME
NT
AD
VE
RT
ISIN
G10
,000
10
,000
NE
OG
OV
6,50
0
6,
500
F
ED
ER
AL
EX
PR
ES
S15
0
150
E
MP
LOY
EE
OF
TH
E M
ON
TH
/YE
AR
AW
AR
D E
XP
EN
SE
S20
0
200
E
RP
AW
AR
D C
ER
TIF
ICA
TE
S1,
500
1,50
0
LEN
GT
H O
F S
ER
VIC
E A
WA
RD
S10
,000
10
,000
O
FF
ICE
SU
PP
LIE
S8,
000
8,00
0
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
36,8
50
-
36
,850
1030
.511
04S
UB
SC
RIP
TIO
NS
LE
GA
L B
ULL
ET
INS
AN
D F
MLA
ON
LIN
E (
3 Y
EA
RS
- 2
021 )
750
75
0
SU
BS
CR
IPT
ION
S T
OT
AL
750
-
750
1030
.511
92T
EC
HN
ICA
L T
RA
ININ
G
EM
PLO
YE
E T
RA
ININ
G
10,0
00
10,0
00
T
EC
HN
ICA
L T
RA
ININ
G T
OT
AL
10,0
00
-
10
,000
1030
.502
08E
DU
CA
TIO
N T
UIT
ION
RE
IMB
UR
SE
ME
NT
E
DU
CA
TIO
N T
UIT
ION
RE
IMB
UR
SE
ME
NT
35,0
00
35
,000
ED
UC
AT
ION
TU
ITIO
N R
EIM
BU
RS
EM
EN
T T
OT
AL
35,0
00
-
35
,000
1030
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
D
OT
DR
UG
& A
LCO
HO
L P
RO
GR
AM
5,00
0
5,
000
EM
PLO
YE
E F
ITN
ES
S F
AC
ILIT
IES
5,00
0
5,
000
U
NE
MP
LOY
ME
NT
INS
UR
AN
CE
10,0
00
10,0
00
S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
TO
TA
L20
,000
-
20,0
00
H
UM
AN
RE
SO
UR
CE
S G
RA
ND
TO
TA
L85
3,60
4
12
7,72
5
98
1,33
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
4FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Adm
inis
trat
ion
GW
RS
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1034
.501
04R
EG
ULA
R S
ALA
RIE
S23
1,50
9
57,8
77
28
9,38
6
10
34.5
0210
PA
YR
OLL
TA
XE
S4,
453
1,
113
5,
566
1034
.502
02R
ET
IRE
ME
NT
35,6
02
8,
901
44
,503
10
34.5
0204
HE
ALT
H IN
SU
RA
NC
E41
,220
10,3
05
51
,525
10
34.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
1,66
7
417
2,08
4
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L31
4,45
1
78,6
13
39
3,06
4
1034
.520
01IN
SU
RA
NC
E
CR
IME
/EX
CE
SS
5,00
0
5,00
0
F
IDU
CIA
RY
6,50
0
6,50
0
GE
NE
RA
L LI
AB
ILIT
Y33
5,50
0
335,
500
P
RO
PE
RT
Y27
9,00
0
279,
000
T
OU
R G
RO
UP
AN
D B
US
INE
SS
TR
AV
EL
4,00
0
4,00
0
IN
SU
RA
NC
E T
OT
AL
630,
000
-
630,
000
1034
.520
05C
LAIM
S
SM
ALL
NO
N-T
RIA
L C
LAIM
S, W
OR
K C
OM
P F
IRS
T A
ID5,
000
5,
000
CL
AIM
S T
OT
AL
5,00
0
-
5,
000
1034
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
EA
ME
RIC
AN
SO
CIE
TY
OF
SA
FE
TY
PR
OF
ES
SIO
NA
LS C
ON
FE
RE
NC
E
2,20
0
2,20
0
P
AS
MA
CO
NF
ER
EN
CE
/BU
SIN
ES
S M
EE
TIN
GS
450
450
MIL
EA
GE
500
500
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
3,15
0
-
3,
150
1034
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
HE
PA
TIT
IS A
AN
D B
SH
OT
S1,
000
1,
000
RE
SP
IRA
TO
R F
IT T
ES
TS
3,00
0
3,00
0
A
CT
IVE
SH
OO
TE
R T
RA
ININ
G10
,000
10,0
00
IND
US
TR
IAL
HY
GIE
NE
MO
NIT
OR
ING
- F
V3,
000
3,
000
EN
VIR
ON
ME
NT
AL
AU
DIT
9,00
0
9,00
0
P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
TO
TA
L26
,000
-
26
,000
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
SA
FE
TY
& R
ISK
MA
NA
GE
ME
NT
(10
34)
Tot
al
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
5FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Adm
inis
trat
ion
GW
RS
AC
TIV
ITY
CO
DE
9900
9922
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
SA
FE
TY
& R
ISK
MA
NA
GE
ME
NT
(10
34)
Tot
al
1034
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
FE
DE
RA
L E
XP
RE
SS
/CO
UR
IER
200
200
OF
FIC
E S
UP
PLI
ES
3,80
0
3,80
0
T
RA
ININ
G M
AT
ER
IALS
AN
D M
EE
TIN
G E
XP
EN
SE
S2,
000
2,
000
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L6,
000
-
6,00
0
1034
.511
04S
UB
SC
RIP
TIO
NS
C
AL
OS
HA
RE
PO
RT
ER
450
450
BU
SIN
ES
S A
ND
LE
GA
L R
EP
OR
T (
BLR
)1,
300
1,
300
MS
DS
ON
LIN
E A
NN
UA
L F
EE
3,
000
3,
000
AN
NU
AL
SU
BS
CR
IPT
ION
AG
RE
EM
EN
T -
SM
AR
T H
AZ
AR
D M
AN
AG
ER
SY
ST
EM
1,00
0
1,00
0
S
UB
SC
RIP
TIO
NS
TO
TA
L5,
750
-
5,75
0
1034
.515
30U
NIF
OR
MS
& S
AF
ET
YE
RG
ON
OM
IC E
QU
IPM
EN
T6,
000
6,
000
PE
RS
ON
AL
PR
OT
EC
TIV
E E
QU
IPM
EN
T -
NO
N O
PE
RA
TIO
NS
DE
PA
RT
ME
NT
S1,
500
1,
500
SA
FE
TY
GLA
SS
ES
- R
X3,
000
3,
000
S
HO
ES
20,0
00
20
,000
U
NIF
OR
MS
& S
AF
ET
Y T
OT
AL
30,5
00
-
30,5
00
1034
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
LM
ED
ICA
L E
QU
IPM
EN
T/A
ED
UN
ITS
& S
UP
PLI
ES
2,50
0
2,50
0
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
2,50
0
-
2,
500
1034
.515
50S
AF
ET
Y S
UP
PLI
ES
CO
NF
INE
D S
PA
CE
EQ
UIP
ME
NT
1,30
0
1,30
0
D
ISA
ST
ER
/HA
ZM
AT
EQ
UIP
ME
NT
/SU
PP
LIE
S2,
000
2,
000
S
AF
ET
Y IN
CE
NT
IVE
S/S
UP
PLI
ES
1,
200
1,
200
F
IRS
T A
ID S
UP
PLI
ES
1,00
0
1,00
0
SIG
NS
, TR
AF
FIC
CO
NE
S, M
ISC
. SA
FE
TY
SU
PP
LIE
S1,
500
1,
500
SA
FE
TY
SU
PP
LIE
S T
OT
AL
7,00
0
-
7,
000
1034
.511
02M
EM
BE
RS
HIP
A
ME
RIC
AN
SO
CIE
TY
OF
SA
FE
TY
PR
OF
ES
SIO
NA
LS35
0
35
0
PU
BLI
C S
AF
ET
Y M
AN
AG
EM
EN
T A
SS
OC
IAT
ION
150
150
M
EM
BE
RS
HIP
TO
TA
L50
0
-
500
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
6FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Adm
inis
trat
ion
GW
RS
AC
TIV
ITY
CO
DE
9900
9922
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
SA
FE
TY
& R
ISK
MA
NA
GE
ME
NT
(10
34)
Tot
al
1034
.511
92S
TA
FF
TR
AIN
ING
CO
NF
INE
D S
PA
CE
- T
RA
ININ
G A
ND
AN
NU
AL
RE
QU
IRE
D D
RIL
LS10
,000
10,0
00
EA
RT
HQ
UA
KE
TR
AIN
ING
& B
OO
TH
2,00
0
2,00
0
R
ES
PIR
AT
OR
TR
AIN
ING
2,00
0
2,00
0
CP
R/F
IRS
T A
ID/A
ED
2,50
0
2,50
0
F
ALL
PR
OT
EC
TIO
N8,
000
8,
000
HA
ZM
AT
24/
40 H
OU
R5,
000
5,
000
HA
ZM
AT
AN
NU
AL
6,00
0
6,00
0
S
AF
ET
Y S
TA
FF
RE
QU
IRE
D P
RO
FE
SS
ION
AL
TR
AIN
ING
2,00
0
2,00
0
S
TA
FF
TR
AIN
ING
TO
TA
L37
,500
-
37
,500
1034
.512
02S
EC
UR
ITY
PR
OG
RA
MA
LAR
M S
YS
TE
M M
ON
ITO
RIN
G -
VA
LLE
Y A
LAR
M (
FH
Q A
ND
PR
AD
O)
3,80
0
3,80
0
B
AY
ALA
RM
FV
1,00
0
1,00
0
S
OLO
PR
OT
EC
T
7,50
0
7,50
0
F
V S
EC
UR
ITY
GU
AR
D S
ER
VIC
ES
140,
000
14
0,00
0
F
IELD
SE
CU
RIT
Y S
ER
VIC
ES
255,
000
25
5,00
0
S
EC
UR
ITY
PR
OG
RA
M T
OT
AL
407,
300
-
407,
300
1034
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
C
ITY
/CO
UN
TY
ALA
RM
PE
RM
ITS
1,80
0
1,80
0
C
OU
NT
Y H
AZ
MA
T W
AS
TE
PR
OG
RA
M -
CU
PA
FE
ES
2,20
0
2,20
0
D
TS
C A
ND
EP
A F
EE
S1,
000
1,
000
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
5,00
0
-
5,
000
S
AF
ET
Y A
ND
RIS
K M
AN
AG
EM
EN
T G
RA
ND
TO
TA
L1,
480,
651
78
,613
1,
559,
264
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
7FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WP
A
ssis
tanc
e G
WR
Sys
tem
O
&M
S
AR
M
onito
ring
NB
GP
P N
CP
S
BG
PP
NC
P
PF
AS
M
TB
E
Litig
atio
n A
CT
IVIT
Y C
OD
E99
0044
0699
2246
0299
8599
8619
1499
54S
ALA
RIE
S &
BE
NE
FIT
S10
36.5
0104
RE
GU
LAR
SA
LAR
IES
281,
654
26
8,40
5
206,
498
12
5,82
4
159,
890
39
,633
21
3,54
2
1,07
1
1,
296,
516
1036
.501
06O
VE
RT
IME
3,
163
2,80
7
2,
712
1,
553
1,68
9
46
1
2,03
7
16
14,4
37
10
36.5
0210
PA
YR
OLL
TA
XE
S4,
130
3,93
3
3,
034
1,
847
2,34
3
58
1
3,12
6
16
19,0
09
10
36.5
0202
RE
TIR
EM
EN
T47
,422
45,1
57
34
,833
21,2
08
26
,903
6,67
6
35,8
94
18
1
21
8,27
4
1036
.502
04H
EA
LTH
INS
UR
AN
CE
47,0
30
41
,917
34,5
66
21
,268
29,1
77
7,
464
34
,943
107
216,
473
1036
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N6,
670
5,57
9
5,
693
3,
350
4,21
0
1,
043
4,34
4
34
30,9
23
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
39
0,06
9
36
7,79
8
28
7,33
6
17
5,04
9
22
4,21
2
55
,859
293,
885
1,42
5
1,79
5,63
2
1036
.513
01T
RA
VE
L/C
ON
FE
RE
NC
ES
A
CW
A C
ON
FE
RE
NC
ES
(S
PR
ING
, FA
LL, &
RE
GU
LAT
OR
Y C
ON
FE
RE
NC
ES
)2,
000
2,
000
A
CW
A W
AT
ER
QU
ALI
TY
CO
MM
ITT
EE
ME
ET
ING
S (
SA
CR
AM
EN
TO
)60
0
60
0
AW
WA
WA
TE
R Q
UA
LIT
Y &
TE
CH
NO
LOG
Y C
ON
FE
RE
NC
E
2,50
0
2,50
0
TR
AV
EL
/CO
NF
ER
EN
CE
S T
OT
AL
5,
100
-
-
-
-
-
-
-
5,10
0
1036
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
O
FF
ICE
/WQ
SA
MP
LIN
G C
ON
SU
MA
BLE
PR
OD
UC
TS
(S
AM
PLE
LA
BE
LS, P
AP
ER
, P
RIN
TE
R C
AR
TR
IDG
ES
, TA
PE
, ET
C.)
; CO
MP
UT
ER
-RE
LAT
ED
EQ
UIP
ME
NT
2,00
0
2,00
0
2,00
0
2,00
0
2,00
050
0
2,
000
12
,500
F
ED
EX
SH
IPP
ING
: WQ
SA
MP
LES
TO
RE
SE
AR
CH
ER
S -
CO
OP
ER
AT
IVE
,
JOIN
T E
FF
OR
T; J
PIA
SA
FE
TY
AN
D T
RA
ININ
G V
IDE
OS
, E
TC
.3,
000
3,
000
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L
5,00
0
2,00
0
2,00
0
2,00
0
2,00
0
500
2,00
0
-
15
,500
1036
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
TR
AF
FIC
CO
NT
RO
L E
NG
INE
ER
SE
RV
ICE
S -
TR
AF
FIC
CO
NT
RO
L P
LAN
S4,
000
4,00
0
T
RA
FF
IC C
ON
TR
OL
CO
NT
RA
CT
OR
SE
RV
ICE
S4,
000
4,00
0
PR
OF
ES
SIO
NA
L S
ER
VIC
E -
GE
NE
RA
L T
OT
AL
8,
000
-
-
-
-
-
-
-
8,00
0
1036
.515
20G
AS
& D
IES
EL
FU
EL
G
AS
OLI
NE
/DIE
SE
L F
UE
L2,
000
3,00
0
3,
000
2,
000
4,00
0
1,
000
3,00
0
18
,000
GA
S &
DIE
SE
L F
UE
L T
OT
AL
2,
000
3,
000
3,
000
2,
000
4,
000
1,
000
3,
000
-
18,0
00
1036
.515
30U
NIF
OR
MS
& S
AF
ET
Y
OC
WD
UN
IFO
RM
S; R
AIN
BO
OT
S; R
AIN
JA
CK
ET
/OV
ER
ALL
S1,
500
1,50
0
UN
IFO
RM
S &
SA
FE
TY
TO
TA
L
1,50
0
-
-
-
-
-
-
-
1,
500
1036
.570
04M
AIN
TE
NA
NC
E &
EQ
UIP
ME
NT
- G
EN
ER
AL
R
OU
TIN
E M
AIN
T &
PA
RT
S F
OR
FIE
LD M
ON
ITO
RIN
G E
QU
IPM
EN
T,
PU
MP
S, G
EN
ER
AT
OR
S, C
ON
ST
RU
CT
ING
AN
CIL
LAR
Y S
YS
TE
MS
,
TR
EA
TM
EN
T IS
SU
ES
, ET
C.;
RE
PLA
CE
ME
NT
EQ
UIP
ME
NT
, FIE
LD M
ET
ER
S,
INS
TR
UM
EN
TA
TIO
N, P
IPE
S, W
IRE
, CO
NN
EC
TO
RS
, FIT
TIN
GS
, PA
RT
S
FO
R M
EC
HA
NIC
AL
AN
D S
UB
ME
RS
IBLE
PU
MP
S; S
AF
ET
Y IT
EM
S, T
RA
FF
IC
CO
NT
RO
L D
EV
ICE
S; R
EP
LAC
EM
EN
T V
EH
ICLE
/OT
HE
R S
PE
CIA
LTY
PA
RT
S4,
000
1,
000
2,
000
1,
000
2,
000
50
0
2,
000
12
,500
R
EP
LAC
EM
EN
T O
F F
AIL
ED
SU
BM
ER
SIB
LE P
UM
PS
- M
P1
&S
QE
PU
MP
S A
T E
XIS
TIN
G S
ITE
S O
R P
UM
PS
ON
TR
UC
KS
4,00
0
4,
000
6,
000
1,00
0
15
,000
HY
DR
AU
LIC
SY
ST
EM
MA
INT
EN
AN
CE
(T
-98)
800
80
0
1,
600
M
AN
UF
AC
TU
RE
R F
IELD
EQ
UIP
ME
NT
RE
PA
IRS
3,50
0
20
0
3,00
0
1,00
0
50
0
200
8,
400
MA
INT
EN
AN
CE
& E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
1,
700
1,
200
9,
800
2,
000
8,
500
1,
700
2,
000
-
37,5
00
1036
.515
45S
MA
LL T
OO
LS/F
IELD
SU
PP
LIE
S
FIE
LD S
UP
PLI
ES
& M
AT
ER
IALS
FO
R S
AM
PLE
CO
LLE
CT
ION
TA
SK
S;
BA
TT
ER
IES
,BU
CK
ET
S, I
CE
CH
ES
TS
, MA
N-H
OL E
PU
LLE
RS
, CA
RB
ON
TR
EA
TM
EN
T V
ES
SE
LS A
ND
AN
CIL
LAR
Y
PA
RT
S, L
OC
KS
, 250
-GA
L D
EC
ON
WA
TE
R T
AN
K(S
) O
R O
TH
ER
TA
NK
S/V
ES
SE
LS,
SA
FE
TY
EQ
UIP
ME
NT
(LI
GH
T B
AR
, CO
NE
S, S
IGN
S),
CA
RB
ON
SU
PP
LIE
S,
SP
EC
IALI
ZE
D F
ITT
ING
S F
OR
CA
RB
ON
TR
EA
TM
EN
T S
YS
TE
M, D
RU
MS
FO
R
SP
EN
T C
AR
BO
N; S
PE
CIA
LTY
ITE
MS
/EQ
UIP
ME
NT
4,00
0
500
3,00
0
3,00
0
2,00
0
500
2,00
0
15,0
00
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R Q
UA
LIT
Y (
1036
)
JDE
Acc
ount
N
umbe
rT
otal
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
8FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WP
A
ssis
tanc
e G
WR
Sys
tem
O
&M
S
AR
M
onito
ring
NB
GP
P N
CP
S
BG
PP
NC
P
PF
AS
M
TB
E
Litig
atio
n A
CT
IVIT
Y C
OD
E99
0044
0699
2246
0299
8599
8619
1499
54
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R Q
UA
LIT
Y (
1036
)
JDE
Acc
ount
N
umbe
rT
otal
1036
.515
45S
MA
LL T
OO
LS/F
IELD
SU
PP
LIE
S (
CO
NT
INU
ED
)
WQ
CO
NS
UM
AB
LE IT
EM
S (
TU
BIN
G, H
OS
ES
, FIT
TIN
GS
, SM
ALL
TO
OLS
, BLU
E IC
E, S
HIP
PIN
G S
UP
PLI
ES
& P
AC
KIN
G M
AT
ER
IAL S
RE
PLA
CE
ME
NT
OF
AG
ED
, FA
ILE
D F
IELD
ME
TE
RS
, PR
OB
ES
,W
AT
ER
LE
VE
L T
AP
ES
, CO
NT
RO
LLE
RS
, ET
C.)
3,00
0
50
0
1,00
0
1,00
0
1,
000
500
1,
000
8,00
0
CA
RB
ON
- M
OB
ILE
CA
RB
ON
TR
EA
TM
EN
T U
NIT
S (
WE
LL D
ISC
HA
RG
ES
)10
,000
4,
000
12
,000
26
,000
SM
AL
L T
OO
LS
/FIE
LD
SU
PP
LIE
S T
OT
AL
17
,000
1,00
0
8,00
0
4,00
0
15,0
00
1,
000
3,
000
-
49,0
00
1036
.515
55LA
B S
UP
PLI
ES
/EQ
UIP
ME
NT
CA
LIB
RA
TIO
N S
OLU
TIO
NS
AN
D F
IELD
PR
ES
ER
VA
TIV
ES
GLA
SS
WA
RE
, ST
OR
AG
E C
ON
TA
INE
RS
, CA
RB
OY
S, G
LOV
ES
, D
ISP
EN
SE
RS
, SA
FE
TY
GLA
SS
ES
, SP
ILL
CO
NT
RO
LM
AT
ER
IALS
, MIS
C. L
AB
SU
PP
LIE
S A
ND
UT
EN
SIL
S,
RA
DIO
AC
TIV
ITY
BO
TT
LES
AN
D O
TH
ER
SP
EC
IALT
Y S
AM
PLE
CO
NT
AIN
ER
S O
R S
UP
PLI
ES
(O
RP
SO
LUT
ION
, ET
C.)
1,00
0
1,
000
1,00
0
500
1,
000
500
1,
000
6,00
0
LA
B S
UP
PL
IES
/EU
IPM
EN
T T
OT
AL
1,
000
1,
000
1,
000
50
0
1,
000
50
0
1,
000
-
6,00
0
1036
.515
60LA
B S
AM
PLE
S A
NA
LYS
IS
GW
RS
PE
RM
IT: F
PW
, TA
LBE
RT
BA
RR
IER
, F
OR
EB
AY
, MID
-BA
SIN
MW
SIT
ES
:
RA
DIO
LOG
ICA
L, P
RIO
RIT
Y P
OLL
UT
AN
TS
, AS
BE
ST
OS
, DIO
XIN
;
MIC
RO
BIA
L, B
IOA
NA
LYT
ICA
L, A
ND
MO
NT
HLY
RO
P C
OLI
PH
AG
E M
ON
ITO
RIN
G.
25,0
00
25
,000
G
WR
S S
PE
CIA
L S
TU
DIE
S (
OC
WD
/OC
SD
PA
TH
OG
EN
LR
V S
TU
DY
, CE
C'S
, ET
C.)
20,0
00
20
,000
G
RO
UN
DW
AT
ER
PR
OD
UC
ER
DR
INK
ING
WA
TE
R W
ELL
TE
ST
ING
: NE
W W
ELL
S,
RA
DIO
LOG
ICA
L T
ES
TIN
G, C
ON
FIR
MA
TIO
N T
ES
TIN
G, E
TC
.20
,000
20,0
00
GR
EE
N A
CR
ES
MO
NIT
OR
ING
800
800
S
AR
MO
N W
AT
ER
QU
ALI
TY
: MIC
RO
BIA
L (E
.G.,
PH
AG
E, B
AC
TE
RIA
L, E
TC
.)
TO
TA
L O
RG
AN
IC H
ALI
DE
S (
TO
X)
AN
D R
AD
IOLO
GIC
AL
TE
ST
ING
35,0
00
35
,000
S
AR
MO
N S
PE
CIA
L S
TU
IDE
S (
EM
ER
GIN
G C
ON
TA
MIN
AN
TS
/ P
FO
A &
PF
OS
)5,
000
5,
000
10,0
00
RIV
ER
DE
SIL
TIN
G S
TU
DIE
S (
RIV
ER
BE
D F
ILT
RA
TIO
N)
3,00
0
3,00
0
IR
VIN
E D
ES
ALT
ER
/MC
AS
TC
E P
LUM
E: N
AV
Y A
GR
EE
ME
NT
, AN
D
IRW
D/D
PH
MO
NIT
OR
ING
PR
OG
RA
M -
SE
NT
INE
L W
ELL
S13
,000
13,0
00
M
ISC
. CO
NT
RA
CT
LA
B T
ES
TIN
G (
SP
ILLS
, EM
ER
GE
NC
IES
, SP
LIT
S,
CO
NF
IRM
AT
ION
TE
ST
ING
, SP
EC
IFIC
AN
ALY
TE
S,
ET
C.)
12,0
00
12
,000
N
PD
ES
TP
H M
ON
ITO
RIN
G D
E M
INIM
US
PE
RM
IT, A
S N
EE
DE
D3,
000
3,
000
WE
ST
BA
Y V
OC
SA
MP
LES
- C
ON
TR
AC
T L
AB
AN
ALY
SIS
2,00
0
2,00
0
U
CM
R4
PR
OG
RA
M -
CO
NT
RA
CT
LA
B A
NA
LYS
IS10
,000
10,0
00
LA
B S
AM
PL
ES
AN
AL
YS
IS T
OT
AL
33
,800
30,0
00
45
,000
40,0
00
-
-
5,
000
-
153,
800
1036
.511
92T
EC
HN
ICA
L T
RA
ININ
G
S
TA
FF
SA
FE
TY
/ W
Q S
AM
PLI
NG
/ T
EC
HN
ICA
L T
RA
ININ
G (
I.E.,
ST
OR
MW
AT
ER
N
EW
PE
RM
IT &
QIS
P T
RA
ININ
G, R
EG
ULA
TO
RY
, MO
NIT
OR
ING
TE
CH
NIQ
UE
S,
3,00
0
3,00
0
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L
3,00
0
-
-
-
-
-
-
-
3,
000
1036
.511
12S
PE
CIA
L D
EP
T E
XP
EN
SE
NP
DE
S S
TO
RM
WA
TE
R P
ER
MIT
- G
WR
S F
AC
ILIT
Y3,
000
3,
000
NP
DE
S G
EN
ER
AL
DE
WA
TE
RIN
G P
ER
MIT
- B
AS
INW
IDE
(E
XC
LUD
ES
D
ISC
HA
RG
ES
TO
NE
WP
OR
T B
AY
)2,
500
2,
500
SP
EN
T C
AR
BO
N D
ISP
OS
AL
CO
ST
S (
CA
RB
ON
TR
EA
TM
EN
T O
F
PU
RG
ED
GW
AT
MO
NIT
OR
ING
WE
LL S
ITE
S T
O M
EE
T N
PD
ES
DIS
CH
AR
GE
PE
RM
IT L
IMIT
S)
4,50
0
4,
500
SP
EC
IAL
DE
PT
EX
PE
NS
E T
OT
AL
7,
000
-
3,00
0
-
-
-
-
-
10
,000
WA
TE
R Q
UA
LIT
Y G
RA
ND
TO
TA
L
475,
169
405,
998
359,
136
225,
549
254,
712
60,5
59
30
9,88
5
1,
425
2,
103,
032
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-1
9FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
Sys
tem
O
&M
T
albe
rt B
arrie
rO
&M
G
AP
O&
M
Gro
undw
ater
Pro
duce
rs'
Ass
ista
nce
MT
BE
Li
tigat
ion
For
ebay
VO
C
N. B
asin
SA
R
Mon
itorin
g P
FA
S
Pra
do O
&M
AC
TIV
ITY
CO
DE
9900
9922
9908
9911
4406
9954
9936
4602
1914
9924
SA
LAR
IES
& B
EN
EF
ITS
1038
.501
04R
EG
ULA
R S
ALA
RIE
S41
8,37
3
1,01
3,77
5
299,
756
88,0
62
96
2,25
3
3,
991
3,99
1
19
3,30
4
26
6,35
8
66
,324
3,
316,
188
1038
.501
06O
VE
RT
IME
6,05
8
24,8
55
7,34
5
1,
883
23,4
18
4,37
8
6,
907
1,52
7
76
,372
1038
.502
10P
AY
RO
LL T
AX
ES
6,25
8
19,7
86
5,24
1
2,
222
18,8
20
58
58
3,61
4
4,
368
1,23
3
61
,658
1038
.502
02R
ET
IRE
ME
NT
70,3
88
16
0,24
1
49
,017
12
,511
151,
956
665
66
5
30,9
05
44,4
09
10,6
28
531,
384
1038
.502
04H
EA
LTH
INS
UR
AN
CE
64,3
44
16
5,41
6
49
,431
12
,785
154,
090
432
43
2
30,7
52
43,7
45
10,6
41
532,
066
1038
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N4,
942
12
,055
3,
564
1,04
5
11
,441
47
47
2,
296
3,17
0
78
8
39,3
95
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
570,
364
1,
396,
127
41
4,35
3
11
8,50
8
1,32
1,97
8
5,19
2
5,
192
265,
250
368,
958
91,1
41
4,55
7,06
2
1038
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
PIT
TC
ON
T/N
EW
SY
ST
EM
/TE
CH
NO
LOG
Y (
NE
W O
RLE
AN
S, 1
ST
AF
F)
500
500
50
0
500
50
0
2,
500
TN
I / C
WE
A-
RE
GU
LAT
OR
Y C
ON
FE
RE
NC
E (
CA
, 2 S
TA
FF
) 30
0
20
0
500
50
0
50
02,
000
NE
MC
(M
INN
EA
PO
LIS
, MN
, 1 S
TA
FF
)50
0
50
0
500
50
0
500
2,50
0
WQ
TC
- A
WW
A C
ON
FE
RE
NC
E (
CH
ICA
GO
,IL, 2
ST
AF
F)
2,00
0
1,
000
50
0
1,00
0
500
5,00
0
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L3,
300
2,
200
1,50
0
1,
500
2,50
0
-
-
-
1,00
0
-
12,0
00
1038
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
O
FF
ICE
SU
PP
OR
T M
AT
ER
IALS
6,00
0
2,00
0
1,
500
200
2,
000
1,
000
1,00
0
1,
500
1,00
0
30
0
16,5
00
P
AP
ER
S, P
AR
TS
, DA
TA
CA
BLE
S, I
NS
TR
UM
EN
T D
AT
A L
INK
S, E
TC
2,00
0
50
0
50
0
10
0
1,00
0
300
30
0
30
0
2,
000
7,
000
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L8,
000
2,
500
2,00
0
30
0
3,00
0
1,30
0
1,
300
1,80
0
3,
000
300
23
,500
1038
.511
04S
UB
SC
RIP
TIO
NS
G
EN
ER
AL
TN
I ST
AN
DA
RD
(4
US
ER
S)
200
200
400
JO
UR
NA
L: A
WW
A, A
CS
, AN
ALY
TIC
AL
CH
RO
MA
TO
GR
AP
HY
200
200
SU
BS
CR
IPT
ION
S T
OT
AL
400
-
-
-
200
-
-
-
-
-
600
1038
.515
30U
NIF
OR
MS
& S
AF
ET
Y
LA
B C
OA
TS
AN
D S
AF
ET
Y E
QU
IPM
EN
T2,
000
1,50
0
50
0
2,00
0
300
50
0
200
7,
000
UN
IFO
RM
S &
SA
FE
TY
TO
TA
L-
2,
000
1,50
0
50
0
2,00
0
-
-
30
0
500
20
0
7,00
0
1038
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
D
ION
EX
IC S
YS
TE
M (
AN
ION
S/ID
BP
, CR
+6)
4,
500
2,00
0
1,
500
5,50
0
2,00
0
2,
000
2,00
0
19
,500
T
HE
RM
O E
LEC
TR
ON
- IC
/MS
6,
000
3,00
0
2,
000
6,00
0
3,00
0
3,
000
2,00
0
25
,000
P
ER
KIN
ELM
ER
ICP
/OE
S
5,00
0
1,
500
500
4,
000
3,
000
4,00
0
2,
000
20,0
00
P
ER
KIN
ELM
ER
ICP
/MS
5,00
0
1,
000
500
5,
000
2,
000
3,00
0
2,
000
18,5
00
A
NN
UA
L LA
BO
RA
TO
RY
BA
LAN
CE
S C
ER
TIF
ICA
TIO
N
400
40
0
200
40
0
40
0
500
40
0
2,70
0
LA
BO
RA
TO
RY
SC
IEN
TIF
IC R
EF
RIG
ER
AT
OR
S (
19)
2,50
0
1,
000
500
2,
500
50
0
500
50
0
8,00
0
BR
UK
ER
GC
/MS
SY
ST
EM
(2)
10
,000
3,
000
1,00
0
10
,000
2,
000
3,00
0
2,
000
31,0
00
IN
ST
RU
ME
NT
S S
OF
TW
AR
E A
ND
CO
MP
UT
ER
S U
PG
RA
DE
3,00
0
1,
000
1,00
0
2,
000
1,
000
1,00
0
1,
000
10,0
00
G
E T
OC
AN
ALY
ZE
RS
(3)
9,
000
3,00
0
1,
000
9,00
0
5,00
0
5,
000
2,00
0
34
,000
A
GIL
EN
T G
C/M
S A
NA
LYT
ICA
L S
YS
TE
MS
(O
RG
AN
IC)
45
,000
12
,000
1,
000
45,0
00
10,0
00
10,0
00
2,00
0
12
5,00
0
W
AT
ER
S H
PLC
SY
ST
EM
S
8,00
0
2,
000
8,00
0
4,00
0
1,
000
1,00
0
24
,000
Tot
alJD
E A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
LAB
OR
AT
OR
Y (
1038
)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
0FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
Sys
tem
O
&M
T
albe
rt B
arrie
rO
&M
G
AP
O&
M
Gro
undw
ater
Pro
duce
rs'
Ass
ista
nce
MT
BE
Li
tigat
ion
For
ebay
VO
C
N. B
asin
SA
R
Mon
itorin
g P
FA
S
Pra
do O
&M
AC
TIV
ITY
CO
DE
9900
9922
9908
9911
4406
9954
9936
4602
1914
9924
Tot
alJD
E A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
LAB
OR
AT
OR
Y (
1038
)
1038
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L (C
ON
TIN
UE
D)
PA
RK
ER
NIT
RO
GE
N G
EN
ER
AT
OR
2,50
0
2,
500
5,
000
PE
AK
TR
I-G
AS
GE
NE
RA
TO
R3,
000
1,00
0
3,
000
2,
000
2,00
0
11
,000
TH
ER
MO
ELE
CT
RO
N A
UT
OT
RA
CE
280
(7)
9,
000
5,00
0
6,
000
5,
000
25,0
00
AB
SC
IEX
550
0 -
LC/M
S/M
S5,
000
1,00
0
5,
000
2,
000
20,0
00
33,0
00
AB
SC
IEX
650
0 -
LC/M
S/M
S5,
000
1,00
0
5,
000
2,
000
22,0
00
35,0
00
LEA
P A
UT
OS
AM
PLE
R2,
000
500
2,
000
1,
000
2,00
0
7,
500
ME
TT
LER
AU
TO
TIT
RA
TO
R1,
500
1,50
0
500
50
0
4,00
0
AG
ILE
NT
LC
SU
PP
OR
T3,
500
500
3,
500
50
0
500
8,
500
HIG
H S
PE
ED
PR
INT
ER
1,00
0
50
0
1,00
0
500
3,
000
DI S
YS
TE
M -
SU
PP
OR
T &
MA
INT
EN
AN
CE
3,
000
2,00
0
1,
000
1,50
0
1,00
0
3,
000
1,00
0
12
,500
ST
ER
IS -
ST
ER
ILIZ
ER
S, D
RY
ING
OV
EN
S &
AU
TO
MA
TE
D W
AS
HE
RS
5,00
0
2,
000
2,00
0
2,
500
2,
000
2,00
0
2,
000
17,5
00
CU
LLIG
AN
RO
SY
ST
EM
400
40
0
400
40
0
40
0
400
40
0
2,80
0
ES
T A
NA
LYT
ICA
L2,
700
1,50
0
10
0
2,30
0
500
1,
000
8,10
0
AC
ID D
ILU
TIO
N T
AN
K P
M'S
1,00
0
1,
000
50
0
500
3,
000
VA
CU
UM
TR
UC
K H
AU
L O
FF
2,00
0
2,
000
50
0
500
5,
000
CH
EM
PR
O -
CO
RR
OS
ION
INH
IBIT
OR
700
70
0
1,
400
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L-
14
5,70
0
45
,300
12,7
00
137,
300
-
-
50,8
00
87
,900
20,3
00
50
0,00
0
1038
.515
45S
MA
LL T
OO
LS &
EQ
UIP
ME
NT
T
OO
LS A
ND
EQ
UIP
ME
NT
TO
SE
RV
ICE
AN
ALY
TIC
AL
SY
ST
EM
1,00
0
50
0
500
50
0
50
0
500
3,
500
SM
AL
L T
OO
LS
& E
QU
IPM
EN
T T
OT
AL
-
1,00
0
500
500
50
0
-
-
50
0
50
0
-
3,50
0
1038
.515
55LA
B S
UP
PLI
ES
S
TA
ND
AR
DS
, PR
OF
ICIE
NC
Y T
ES
T &
QA
/QC
SA
MP
LES
5,
000
45
,000
20
,000
20
,000
50,0
00
10,0
00
15,0
00
165,
000
RE
AG
EN
TS
, SO
LVE
NT
S &
CH
EM
ICA
LS10
,000
120,
000
60,0
00
50,0
00
12
0,00
0
30
,000
5,
000
395,
000
GC
-LC
-MS
CO
LUM
NS
, DE
TE
CT
OR
S &
AN
ALY
TIC
AL
PA
RT
S
10,0
00
60
,000
35
,000
25
,000
60,0
00
20,0
00
5,00
0
21
5,00
0
E
XT
RA
CT
ION
CA
RT
RID
GE
S &
DIS
KS
2,00
0
10,0
00
5,00
0
3,
000
10,0
00
10,0
00
15,0
00
55,0
00
GA
S (
HE
LIU
M, N
ITR
OG
EN
, CA
RB
ON
DIO
XID
E, A
RG
ON
) S
UP
PLY
20,0
00
10,0
00
8,00
0
20
,000
10
,000
68
,000
MIS
CE
LLA
NE
OU
S S
UP
PL
Y50
0
30
0
20
0
500
500
2,00
0
LA
B S
UP
PL
IES
TO
TA
L27
,000
255,
500
130,
300
106,
200
26
0,50
0
-
-
80,5
00
40,0
00
-
90
0,00
0
1038
.515
60LA
B S
AM
PLE
S A
NA
LYS
IS
CO
NF
IRM
AT
ION
DA
TA
FR
OM
A S
EC
ON
D L
AB
400
200
200
40
0
40
0
40
0
2,
000
LA
B S
AM
PL
ES
AN
AL
YS
IS T
OT
AL
-
400
20
0
200
40
0
-
-
400
40
0
-
2,
000
1038
.515
65E
QU
IPM
EN
T R
EN
TA
L -
GE
NE
RA
L
C
YLI
ND
ER
RE
NT
AL
200
20
0
100
30
0
10
0
100
1,
000
EQ
UIP
ME
NT
RE
NT
AL
- G
EN
ER
AL
TO
TA
L-
20
0
200
10
0
300
-
-
10
0
100
-
1,00
0
1038
.511
92E
DU
CA
TIO
NA
L T
RA
ININ
G
A
NN
UA
L LA
B T
RA
ININ
G O
N T
NI Q
UA
LIT
Y S
YS
TE
M/E
TH
ICS
1,
000
1,
000
1,00
0
1,00
0
1,
000
5,00
0
ED
UC
AT
ION
AL
TR
AIN
ING
TO
TA
L1,
000
1,
000
-
-
1,
000
-
-
1,00
0
1,
000
-
5,
000
1038
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
AN
NU
AL
CE
RT
IFIC
AT
ION
FE
E -
ST
AT
E E
LAP
& 3
RD
PA
RT
Y T
NI A
UD
IT5,
000
5,
000
2,00
0
2,
000
5,00
0
2,00
0
4,
000
25,0
00
H
AZ
AR
DO
US
WA
ST
E D
ISP
OS
AL
SE
RV
ICE
7,50
0
5,
000
5,00
0
7,
500
2,
000
3,00
0
30
,000
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
5,00
0
12,5
00
7,00
0
7,
000
12,5
00
-
-
4,
000
7,00
0
-
55,0
00
L
AB
OR
AT
OR
Y G
RA
ND
TO
TA
L61
5,06
4
1,81
9,12
7
602,
853
247,
508
1,
742,
178
6,
492
6,49
2
40
4,65
0
51
0,35
8
11
1,94
1
6,
066,
662
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
1FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
GW
R
Pro
cess
O
pt.
GW
RS
yste
m
O&
M
For
ebay
O&
M
AD
VM
ET
R
eNU
WIt
ER
C
Gra
nts/
P
ropo
sals
P
artic
ip-
atin
g U
tility
N
ext G
en.
Seq
. U
SB
R
CC
D F
O
US
BR
N
DM
A
US
BR
LRV
RO
U
SB
RU
CR
AO
P
PF
AS
U
SF
UN
RN
DM
A
OC
SD
V
IRU
S
MW
D/W
RF
US
BR
P
AA
Q
uaga
C
ontr
ol
WE
& R
FT
reat
men
t T
otal
AC
TIV
ITY
CO
DE
9900
9952
9922
9920
9953
9995
9996
9997
9992
1781
1782
1801
1809
1914
1810
190
119
1619
1399
98
SA
LAR
IES
& B
EN
EF
ITS
1040
.501
04R
EG
ULA
R S
ALA
RIE
S25
5,67
9
29
0,24
7
83
,439
32,2
15
2,
667
1,
649
41
,157
30,9
69
1,
649
29
,897
21,6
92
43
,021
36,9
33
22
,169
11,3
99
68
,977
77,2
12
20
,446
16,7
44
1,
088,
161
CA
PIT
ALI
ZE
D S
ALA
RIE
S(1
19,9
37)
(1
19,9
37)
1040
.502
10P
AY
RO
LL T
AX
ES
3,96
5
7,47
1
2,88
6
1,11
2
39
24
597
449
24
434
315
753
561
321
165
1,00
0
1,49
0
296
243
22,1
46
1040
.502
02R
ET
IRE
ME
NT
41,8
78
39
,564
9,39
0
3,63
2
444
275
6,85
3
5,15
6
275
4,97
8
3,61
2
6,81
7
6,08
0
3,69
1
1,89
8
11,4
85
11
,860
3,40
4
2,78
8
164,
079
1040
.502
04H
EA
LTH
INS
UR
AN
CE
36,5
54
28
,221
12,5
04
4,
263
27
7
18
9
6,
614
4,
274
18
9
3,
844
2,
662
4,
585
3,
996
3,
386
1,
455
10
,683
8,62
4
3,03
6
2,09
4
137,
450
1040
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N2,
850
5,
017
96
2
36
3
24
19
44
6
34
8
19
35
0
25
4
32
7
43
2
25
9
13
3
77
2
1,
155
23
9
19
6
14
,166
CA
PIT
ALI
ZE
D B
EN
EF
ITS
(40,
480)
(40,
480)
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L18
0,50
9
37
0,52
0
10
9,18
2
41
,584
3,45
1
2,15
6
55,6
66
41
,197
2,15
6
39,5
03
28
,533
55,5
03
48
,002
29,8
27
15
,050
92,9
16
10
0,34
1
27
,422
22,0
65
1,
265,
585
1040
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
R
EN
UW
IT N
SF
ER
C IA
B M
EE
TIN
GS
(S
TA
NF
OR
D, B
ER
KE
LEY
, C
O S
CH
OO
L O
F M
INE
S, N
EW
ME
XIC
O S
TA
TE
U)
1,00
0
1,00
0
35T
H A
NN
UA
L W
AT
ER
EU
SE
SY
MP
OS
IUM
(2
ST
AF
F,
DE
NV
ER
, 9/2
020)
3,20
0
3,20
0
36T
H A
NN
UA
L W
AT
ER
EU
SE
SY
MP
OS
IUM
(2
ST
AF
F, T
AM
PA
, 3/
2021
)3,
200
3,
200
WA
TE
RE
US
E C
ALI
FO
RN
IA A
NN
UA
L C
ON
FE
RE
NC
E (
1 S
TA
FF
, LO
S A
NG
ELE
S, 9
/202
0)90
0
90
0
AW
WA
ME
MB
RA
NE
TE
CH
NO
LOG
Y C
ON
FE
RE
NC
E (
2 S
TA
FF
, W
ES
T P
ALM
BE
AC
H F
L, 3
/202
1)3,
800
3,
800
GR
A W
ES
TE
RN
GR
OU
ND
WA
TE
R C
ON
GR
ES
S (
3 S
TA
FF
, B
UR
BA
NK
, 9/2
021)
4,20
0
4,20
0
AM
ER
ICA
N S
OC
IET
Y O
F M
ICR
OB
IOLO
GY
(A
SM
) M
ICR
OB
E
CO
NF
ER
EN
CE
(2
ST
AF
F, A
NA
HE
IM, 6
/202
1)1,
800
1,
800
CLA
RK
E P
RIZ
E C
ON
FE
RE
NC
E (
5 S
TA
FF
, FA
LL 2
021)
800
800
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L-
17,9
00
-
-
-
1,00
0
-
-
-
-
-
-
-
-
-
-
-
-
-
18
,900
1040
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L
RE
SE
AR
CH
CO
LLA
BO
RA
TIO
N S
UP
PO
RT
(T
WO
PR
OJE
CT
S)
50,0
00
50
,000
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
TO
TA
L50
,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
50,0
00
1040
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
M
ISC
. OF
FIC
E E
XP
EN
SE
S (
NO
TE
BO
OK
S, P
HO
TO
, RE
PO
RT
P
RE
PA
RA
TIO
N, P
OS
TE
RS
, SO
FT
WA
RE
)2,
500
2,
500
P
RIN
TE
R IN
K/T
ON
ER
CA
RT
RID
GE
S50
0
50
0
SH
IPP
ING
(F
ED
EX
/CO
UR
IER
) 1,
500
1,
500
O
FF
ICE
FU
RN
ITU
RE
1,20
0
1,20
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L5,
700
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5,
700
1040
.515
20G
AS
& D
IES
EL
FU
EL
F
UE
L F
OR
DE
PA
RT
ME
NT
VE
HIC
LE1,
200
1,
200
GA
S &
DIE
SE
L F
UE
L T
OT
AL
1,20
0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,20
0
1040
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
A
LL B
ALA
NC
ES
(9)
30
0
30
0
A
LL IN
CU
BA
TO
RS
(7)
500
500
M
ICR
OS
CO
PE
RE
PA
IR/C
LEA
NIN
G50
0
50
0
A
BI S
TE
P O
NE
PLU
S R
EP
AIR
3,00
0
3,00
0
A
LL H
OO
D S
AF
ET
Y IN
SP
EC
TIO
N/C
ALI
BR
AT
ION
(5)
400
400
FR
L E
QU
IPM
EN
T M
AIN
TE
NA
NC
E1,
500
1,
500
HA
CH
600
0 S
PE
CT
RO
PH
OT
OM
ET
ER
SE
RV
ICE
(E
RC
HA
CH
O
R L
AB
HA
CH
, RO
TA
TE
EV
ER
Y O
TH
ER
YE
AR
)1,
200
1,
200
HA
CH
EZ
AT
P A
NA
LYZ
ER
(G
RA
NT
RE
IMB
UR
SE
D)
4,80
0
4,80
0
HO
RIB
A A
QU
ALO
G L
AM
P R
EP
LAC
EM
EN
T1,
000
1,
000
LA
RG
E R
EF
RIG
ER
AT
OR
25
0
25
0
U
V R
AD
IOM
ET
ER
CA
LIB
RA
TIO
N/S
ER
VIC
E45
0
45
0
V
ER
TI F
AS
T T
HE
RM
OC
YC
LER
RE
PA
IR2,
000
2,
000
CO
ULT
ER
MU
LTIS
IZE
R 4
(P
AR
TIC
LE C
OU
NT
ER
) S
ER
VIC
E
CO
NT
RA
CT
5,25
0
5,25
0
U
LTR
A L
OW
TE
MP
FR
EE
ZE
R1,
000
1,
000
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L17
,350
-
-
-
-
-
-
-
-
-
-
4,80
0
-
-
-
-
-
-
-
22
,150
1040
.570
16M
AIN
T S
TR
UC
TU
RE
& IM
PR
OV
EM
EN
T -
GE
NE
RA
L
G
EN
ER
AL
DE
PA
RT
ME
NT
AL
RE
PA
IR W
OR
K4,
000
4,
000
4,00
0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,00
0
1040
.515
55LA
B S
UP
PLI
ES
& S
MA
LL E
QU
IPM
EN
T
LA
B C
ON
SU
MA
BLE
S /
EQ
UIP
. - G
EN
ER
AL
18,0
00
10
,000
6,00
0
34,0
00
LA
B C
ON
SU
MA
BLE
S /
EQ
UIP
. - M
OLE
C. B
IO. S
UP
PLI
ES
7,
000
7,
000
PIL
OT
S /
ER
C -
GE
NE
RA
L4,
000
4,
000
P
ILO
TS
/ E
RC
- M
EM
BR
AN
ES
(M
F/R
O)
5,00
0
5,00
0
U
SB
R B
IOC
IDE
GR
AN
T (
CO
ST
SH
AR
E)
12,6
90
12
,690
U
SB
R R
O L
RV
GR
AN
T (
GR
AN
T R
EIM
BU
RS
ED
)12
,000
12,0
00
LA
B S
UP
PL
IES
& S
MA
LL
EQ
UIP
ME
NT
TO
TA
L-
27,0
00
10
,000
6,00
0
-
-
-
-
7,00
0
-
-
12,0
00
-
-
-
-
12
,690
-
-
74,6
90
MA
INT
ST
RU
CT
UR
E &
IMP
RO
VE
ME
NT
- G
EN
ER
AL
TO
TA
L
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
SE
AR
CH
& D
EV
ELO
PM
EN
T (
1040
)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
2FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
GW
R
Pro
cess
O
pt.
GW
RS
yste
m
O&
M
For
ebay
O&
M
AD
VM
ET
R
eNU
WIt
ER
C
Gra
nts/
P
ropo
sals
P
artic
ip-
atin
g U
tility
N
ext G
en.
Seq
. U
SB
R
CC
D F
O
US
BR
N
DM
A
US
BR
LRV
RO
U
SB
RU
CR
AO
P
PF
AS
U
SF
UN
RN
DM
A
OC
SD
V
IRU
S
MW
D/W
RF
US
BR
P
AA
Q
uaga
C
ontr
ol
WE
& R
FT
reat
men
t T
otal
AC
TIV
ITY
CO
DE
9900
9952
9922
9920
9953
9995
9996
9997
9992
1781
1782
1801
1809
1914
1810
190
119
1619
1399
98
JDE
Acc
ount
N
umbe
r
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
SE
AR
CH
& D
EV
ELO
PM
EN
T (
1040
)
1040
.515
60LA
B S
AM
PLE
S A
NA
LYS
IS
S
EM
AN
ALY
SIS
6,00
0
6,00
0
O
TH
ER
S (
DN
A S
EQ
UE
NC
ING
, CH
EM
ICA
L A
NA
LYS
IS, E
TC
.)2,
000
2,00
0
WR
F/M
WD
OC
SD
VIR
US
ST
UD
Y (
GR
AN
T R
EIM
BU
RS
ED
)30
,000
30,0
00
US
BR
RO
LR
V G
RA
NT
(G
RA
NT
RE
IMB
UR
SE
D)
9,00
0
9,00
0
U
SB
R B
IOC
IDE
GR
AN
T (
GR
AN
T R
EIM
BU
RS
ED
)6,
000
6,
000
LA
B S
AM
PL
ES
AN
AL
YS
IS T
OT
AL
-
8,
000
-
-
-
-
-
-
-
-
-
9,00
0
-
-
-
30
,000
6,00
0
-
-
53,0
00
1040
.515
65E
QU
IPM
EN
T R
EN
TA
L -
GE
NE
RA
L
BO
TT
LED
WA
TE
R S
ER
VIC
E (
SP
AR
KLE
TT
S B
PO
AN
NE
X)
1,00
0
1,00
0
DI C
AR
TR
IDG
ES
(E
VO
QU
A B
PO
)2,
000
2,
000
GA
S C
YLI
ND
ER
S/L
IQU
ID N
2 (W
ES
TA
IR B
PO
) 40
0
40
0
EQ
UIP
ME
NT
RE
NT
AL
- G
EN
ER
AL
TO
TA
L3,
400
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,
400
1040
.511
02M
EM
BE
RS
HIP
P
RO
FE
SS
ION
AL
EN
GIN
EE
R L
ICE
NS
E R
EN
EW
AL
FE
E11
5
11
5
IN
TE
RN
AT
ION
AL
ULT
RA
VIO
LET
AS
SO
CIA
TIO
N (
IUV
A)
250
250
RE
NU
WIT
NS
F E
RC
IAB
ME
MB
ER
SH
IP F
EE
(S
TA
NF
OR
D,
BE
RK
ELE
Y, C
O S
CH
OO
L O
F M
INE
S, N
EW
ME
XIC
O S
TA
TE
U)
10,0
00
10
,000
WA
TE
R U
CI I
ND
US
TR
Y-U
NIV
ER
SIT
Y R
ES
EA
RC
H C
EN
TE
R
ME
MB
ER
SH
IP50
,000
50,0
00
SO
IL S
CIE
NC
E S
OC
IET
Y O
F A
ME
RIC
A (
SS
SA
) 10
4
10
4
NA
TIO
NA
L G
RO
UN
DW
AT
ER
AS
SO
CIA
TIO
N13
5
13
5
M
EM
BE
RS
HIP
TO
TA
L60
,604
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
60,6
04
1040
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
JO
UR
NA
L P
AG
E C
HA
RG
ES
& R
EP
RIN
TS
500
500
R
EF
ER
EN
CE
MA
TE
RIA
L (B
OO
KS
, MA
NU
ALS
)50
0
50
0
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
1,00
0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,00
0
R
ES
EA
RC
H A
ND
DE
VE
LO
PM
EN
T G
RA
ND
TO
TA
L32
3,76
3
42
3,42
0
11
9,18
2
47
,584
3,45
1
3,15
6
55,6
66
41
,197
9,15
6
39,5
03
28
,533
81,3
03
48
,002
29,8
27
15
,050
122,
916
119,
031
27,4
22
22
,065
1,56
0,22
9
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
3FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
S
AR
CC
UP
P
rado
FS
AC
TIV
ITY
CO
DE
9900
9993
9978
SA
LAR
IES
& B
EN
EF
ITS
1044
.501
0 4R
EG
ULA
R S
ALA
RIE
S45
4,53
7
182,
235
17
,868
65
4,64
1
1044
.502
10
PA
YR
OLL
TA
XE
S6,
659
3,94
4
25
9
10,8
62
10
44.5
0202
RE
TIR
EM
EN
T75
,496
26
,847
2,
975
105,
318
10
44.5
020
4H
EA
LTH
INS
UR
AN
CE
53,2
72
24,8
63
1,97
1
80
,105
1044
.502
06
WO
RK
ER
S' C
OM
PE
NS
AT
ION
2,72
7
1,
093
107
3,
928
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
592,
692
23
8,98
3
23,1
80
854,
855
1044
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
AC
WA
CO
NF
ER
EN
CE
S (
FA
LL A
ND
SP
RIN
G)
2,50
0
2,
500
AC
WA
GR
OU
ND
WA
TE
R C
OM
M M
TG
S IN
SA
CR
AM
EN
TO
600
60
0
WA
SH
ING
TO
N D
C M
TG
WIT
H A
RM
Y C
OR
PS
ON
PR
AD
O F
S1,
300
1,30
0
G
RA
AN
NU
AL
ME
ET
ING
& G
RA
GR
OU
ND
WA
TE
R S
US
TA
INA
BIL
ITY
SU
MM
IT2,
000
2,00
0
F
IRO
WO
RK
SH
OP
S3,
000
3,00
0
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
8,10
0
-
1,
300
9,40
0
1044
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
PR
AD
O B
AS
IN F
EA
SIB
ILIT
Y S
TU
DY
(C
ON
SU
LTA
NT
SU
PP
OR
T)
30,0
00
30
,000
PR
AD
O F
OR
EC
AS
T IN
FO
RM
ED
RE
SE
RV
OIR
OP
ER
AT
ION
S E
VA
LUA
TIO
N29
1,00
0
291,
000
SU
PP
OR
T F
OR
CE
QA
CO
MP
LIA
NC
E (
AIR
& N
OIS
E A
NA
LYS
ES
)60
,000
60,0
00
R
EC
HA
RG
E F
AC
ILIT
IES
MO
DE
L S
IMU
LAT
ION
S10
,000
10,0
00
Q
UA
GG
A C
ON
TR
OL
ST
UD
Y20
,000
20,0
00
S
A R
IVE
R C
ON
SE
RV
AT
ION
AN
D C
ON
JUN
CT
IVE
US
E P
RO
JEC
T14
5,00
0
145,
000
PR
OF
ES
SIO
NA
L S
ER
VIC
E -
GE
NE
RA
L T
OT
AL
38
1,00
0
145,
000
30
,000
55
6,00
0
1044
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
OF
FIC
E S
UP
PLI
ES
10
0
100
R
EW
G M
EE
TIN
G E
XP
EN
SE
S30
0
300
SP
EC
IAL
CO
PY
ING
AN
D F
ED
ER
AL
EX
PR
ES
S1,
500
1,50
0
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
1,
900
-
-
1,90
0
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PLA
NN
ING
& W
AT
ER
SH
ED
MA
NA
GE
ME
NT
(10
44)
JDE
Acc
ount
N
umbe
rT
otal
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
4FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
S
AR
CC
UP
P
rado
FS
AC
TIV
ITY
CO
DE
9900
9993
9978
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PLA
NN
ING
& W
AT
ER
SH
ED
MA
NA
GE
ME
NT
(10
44)
JDE
Acc
ount
N
umbe
rT
otal
1044
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
WA
TE
R R
IGH
TS
FE
E (
ST
AT
E W
AT
ER
RE
SO
UR
CE
S C
ON
TR
OL
BO
AR
D)
35,0
00
35
,000
RE
GIO
NA
L G
EN
ER
AL
MA
INT
EN
AN
CE
PE
RM
IT (
CA
DE
PT
OF
FIS
H &
WIL
DLI
FE
AN
NU
AL
FE
E)
16,0
00
16,0
00
O
.C. C
ON
SE
RV
AT
ION
CO
RP
- A
DO
PT
ED
CH
AN
NE
L18
,400
18
,400
RE
WG
ST
UD
IES
(C
LOG
GIN
G S
TU
DIE
S, S
UB
SU
RF
AC
E R
EC
HA
RG
E)
25,0
00
25,0
00
P
ER
MIT
FE
ES
FO
R P
RO
JEC
TS
(C
DF
G, A
RM
Y C
OR
PS
, RE
G B
OA
RD
, CE
QA
FIL
ING
S)
9,00
0
9,
000
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
103,
400
-
-
10
3,40
0
1044
.515
30U
NIF
OR
MS
& S
AF
ET
Y
DIS
TR
ICT
SH
IRT
S20
0
200
U
NIF
OR
MS
& S
AF
ET
Y T
OT
AL
200
-
-
20
0
1044
.511
02M
EM
BE
RS
HIP
PR
OF
ES
SIO
NA
L C
ER
TIF
ICA
TIO
NS
& M
EM
BE
RS
HIP
S40
0
400
M
EM
BE
RS
HIP
TO
TA
L40
0
-
-
400
PL
AN
NIN
G &
WA
TE
RS
HE
D M
AN
AG
EM
EN
T G
RA
ND
TO
TA
L1,
087,
692
383,
983
54
,480
1,52
6,15
5
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
5FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1045
.501
04R
EG
ULA
R S
ALA
RIE
S18
3,20
8
32,3
31
21
5,53
9
10
45.5
0210
PA
YR
OLL
TA
XE
S2,
657
46
9
3,
125
1045
.502
02R
ET
IRE
ME
NT
30,5
04
5,
383
35
,887
10
45.5
0204
HE
ALT
H IN
SU
RA
NC
E20
,839
3,67
7
24,5
16
1045
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N1,
099
19
4
1,
293
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
238,
306
42
,054
280,
360
10
45.5
1102
ME
MB
ER
SH
IPS
ME
MB
ER
SH
IPS
(O
CW
A, A
WW
A, C
RW
A)
200
200
M
EM
BE
RS
HIP
S T
OT
AL
200
-
20
0
1045
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
EA
CW
A M
EE
TIN
G1,
200
1,
200
CA
L D
ES
AL
500
500
LO
CA
L M
EE
TIN
GS
250
250
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
1,95
0
-
1,
950
1045
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
OF
FIC
E/M
EE
TIN
G S
UP
PLI
ES
400
400
C
OLO
R C
OP
IES
300
300
F
ED
ER
AL
EX
PR
ES
S T
O G
RA
NT
& L
OA
N F
UN
DIN
G A
GE
NC
IES
400
400
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
1,10
0
-
1,
100
1045
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
L
PO
SE
IDO
N S
TU
DIE
S50
,000
50,0
00
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
TO
TA
L50
,000
-
50
,000
LO
CA
L R
ES
OU
RC
ES
GR
AN
D T
OT
AL
291,
556
42,0
54
333,
610
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
LOC
AL
RE
SO
UR
CE
S (
1045
)
JDE
Acc
ount
N
umbe
rT
otal
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
6FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
P
FA
S
GW
R
Sys
tem
O&
M
SA
RM
onito
ring
GA
P O
&M
AC
TIV
ITY
CO
DE
9900
1914
9922
4602
9911
SA
LAR
IES
& B
EN
EF
ITS
1046
.501
04R
EG
ULA
R S
ALA
RIE
S14
7,39
7
86
,431
79,8
71
44
,521
358,
220
1046
.502
10P
AY
RO
LL T
AX
ES
2,13
7
1,25
3
1,
158
64
6
5,19
4
1046
.502
02R
ET
IRE
ME
NT
24,5
42
14
,391
13,2
98
7,
413
59,6
44
1046
.502
04H
EA
LTH
INS
UR
AN
CE
27,3
47
10
,720
9,49
0
5,39
4
52
,951
1046
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N88
4
51
9
479
267
2,
149
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
202,
307
113,
313
10
4,29
7
58,2
41
-
47
8,15
8
1046
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
W
AT
ER
QU
ALI
TY
PO
LIC
Y/L
EG
ISLA
TIO
N T
RIP
S (
SA
CR
AM
ET
NO
, CA
) (3
)75
0
75
0
1,50
0
35
TH
WA
TE
RE
US
E S
YM
PO
SIU
M (
SE
PT
EM
BE
R 2
020:
DE
NV
ER
, CO
) (1
ST
AF
F)
1,50
0
1,50
0
36T
H W
AT
ER
EU
SE
SY
MP
OS
IUM
(M
AR
CH
202
1: T
AM
PA
, FL)
(1
ST
AF
F)
2,00
0
2,00
0
2021
WA
TE
RE
US
E C
ALI
FO
RN
IA A
NN
UA
L C
ON
F (
MA
RC
H: I
ND
IAN
WE
LLS
, CA
) (1
ST
AF
F)
1,25
0
1,25
0
2020
SE
TA
C N
OR
TH
AM
ER
ICA
CO
NF
ER
EN
CE
(N
OV
: FT
. WO
RT
H, T
X)
1,75
0
1,
750
WR
F: W
AT
ER
RE
US
E A
DV
ISO
RY
CO
MM
ITT
EE
ME
ET
ING
(D
EN
VE
R, C
O)
500
500
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L75
0
2,
500
5,25
0
-
-
8,50
0
1046
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
- G
EN
ER
AL
G
AP
RE
GU
LAT
OR
Y C
ON
SU
LTIN
G20
,000
20,0
00
CO
NS
ULT
ING
SE
RV
ICE
S F
OR
202
0 G
WR
S A
NN
UA
L R
EP
OR
T57
,000
57,0
00
NW
RI S
AR
WQ
MO
NIT
OR
ING
(S
AR
MO
N)
IND
EP
EN
DE
NT
AD
VIS
OR
Y P
AN
EL
30,0
00
30
,000
NW
RI G
WR
S IN
DE
PE
ND
EN
T A
DV
ISO
RY
PA
NE
L (P
ER
MIT
RE
QM
T)
55,0
00
55
,000
PF
AS
TO
XIC
OLO
GY
/RIS
K A
SS
ES
SM
EN
T C
ON
SU
LTIN
G70
,000
70,0
00
PR
OF
ES
SIO
NA
L S
ER
VIC
E -
GE
NE
RA
L T
OT
AL
-
70
,000
112,
000
30
,000
20,0
00
23
2,00
0
1046
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
S
HIP
PIN
G C
OS
T/F
ED
EX
/ON
TR
AC
500
500
O
FF
ICE
SU
PP
LIE
S (
TO
NE
R, E
TC
.)1,
000
1,
000
CO
LOR
CO
PIE
S F
OR
GW
RS
AN
NU
AL
RE
PO
RT
& S
AR
MO
N P
AN
EL
BO
OK
LET
S1,
500
50
0
2,00
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L1,
500
-
1,
500
50
0
-
3,50
0
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
GU
LAT
OR
Y A
FF
AIR
S (
1046
)
Tot
alJD
E A
ccou
nt
Num
ber
O
rang
e C
ount
y W
ater
Dis
tric
t11
-27
FY 2
020-
21 B
udge
t Rep
ort
Des
crip
tion
Gen
eral
P
FA
S
GW
R
Sys
tem
O&
M
SA
RM
onito
ring
GA
P O
&M
AC
TIV
ITY
CO
DE
9900
1914
9922
4602
9911
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
GU
LAT
OR
Y A
FF
AIR
S (
1046
)
Tot
alJD
E A
ccou
nt
Num
ber
1046
.511
04S
UB
SC
RIP
TIO
N
GO
TO
ME
ET
ING
ON
LIN
E M
EE
TIN
G S
UB
SC
RIP
TIO
N50
0
50
0
SU
BS
CR
IPT
ION
TO
TA
L50
0
-
-
-
-
500
1046
.511
02M
EM
BE
RS
HIP
S A
ND
RE
GIS
TR
AT
ION
S
M
EM
BE
RS
HIP
S A
ND
PR
OF
ES
SIO
NA
L R
EG
IST
RA
TIO
NS
1,20
0
1,20
0
ME
MB
ER
SH
IPS
AN
D R
EG
IST
RA
TIO
NS
TO
TA
L1,
200
-
-
-
-
1,20
0
1046
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
RW
QC
B N
DP
ES
PE
RM
IT F
EE
FO
R G
WR
S E
ME
RG
EN
CY
RIV
ER
DIS
CH
AR
GE
6,00
0
6,00
0
SW
RC
B D
DW
FE
ES
FO
R R
EV
IEW
ING
PE
RM
ITS
, PR
OJE
CT
S, P
AN
EL
ME
ET
ING
S15
,000
30,0
00
45
,000
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
-
15
,000
36,0
00
-
-
51
,000
RE
GU
LA
TO
RY
AF
FA
IRS
GR
AN
D T
OT
AL
206,
257
200,
813
25
9,04
7
88,7
41
20
,000
774,
858
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
8FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
SA
LA
RIE
S &
BE
NE
FIT
S
10
50
.50
10
4R
EG
UL
AR
SA
LA
RIE
S9
78
,66
3
3
,60
0,6
09
14
7,8
68
2
74
,00
8
4
28
,86
4
55
9,2
91
84
,33
6
3
2,5
56
11
9,3
81
6
1,9
43
3
4,2
41
4
10
,46
5
6,7
32
,22
4
1
05
0.5
01
06
OV
ER
TIM
E S
AL
AR
IES
33
,61
6
2
62
,96
8
4,4
86
8,2
25
19
,57
5
4
3,6
38
2,9
91
1,1
54
3,5
15
2
,87
2
82
4
3
,86
6
38
7,7
31
(17
7,3
96
)
(17
7,3
96
)
1
05
0.5
02
10
PA
YR
OL
L T
AX
ES
14
,67
8
5
8,9
40
2
,62
8
4
,09
2
6
,50
2
8
,74
2
1,2
66
48
9
2,1
85
9
40
50
8
1
8,7
10
1
19
,68
2
1
05
0.5
02
02
RE
TIR
EM
EN
T1
68
,54
4
63
5,4
50
2
4,2
41
4
6,9
92
74
,66
5
1
00
,38
8
14
,54
0
5,6
13
19
,38
0
10
,79
2
5,8
38
3
4,8
74
1
,14
1,3
17
1
05
0.5
02
04
HE
AL
TH
INS
UR
AN
CE
17
6,6
40
6
42
,33
7
24
,17
9
54
,01
0
8
3,6
35
10
4,4
55
1
5,1
05
6
,68
4
2
0,2
18
1
1,3
14
6
,40
8
35
,65
5
1,1
80
,64
0
10
50
.50
20
6W
OR
KE
RS
' CO
MP
EN
SA
TIO
N2
7,8
57
11
1,1
83
3
,33
5
7
,91
8
1
3,9
01
18
,04
3
2
,57
0
1
,05
6
3
,62
5
2,0
24
8
69
5,9
48
1
98
,32
9
(6
6,0
03
)
(66
,00
3)
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
1,1
56
,59
8
5
,31
1,4
86
20
6,7
39
39
5,2
45
6
27
,14
1
83
4,5
57
1
20
,80
9
4
7,5
52
1
68
,30
4
8
9,8
85
4
8,6
88
5
09
,51
8
9
,51
6,5
23
10
50
.51
30
1T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
EP
AT
EL
JU
LY
20
20
AM
TA
WO
RK
SH
OP
AN
D B
OA
RD
ME
ET
ING
, FA
RG
O, N
D
(JU
ST
AT
TE
ND
ING
AM
TA
BO
AR
D M
EE
TIN
G A
T E
VE
NT
, TR
IP C
OS
TS
P
AR
TIA
LL
Y R
EIM
BU
RS
ED
BY
AM
TA
)3
00
30
0
PA
TE
L M
AR
CH
22
-26
, 20
21
AW
WA
/AM
TA
JO
INT
ME
MB
RA
NE
TE
CH
NO
LO
GY
C
ON
F, W
ES
T P
AL
M B
EA
CH
, FL
(C
ON
F O
RG
AN
IZE
R, A
MT
A B
OA
RD
ME
ET
ING
)3
,00
0
3,0
00
PA
TE
L O
CT
OB
ER
20
-22
, 20
20
AM
TA
WO
RK
SH
OP
, LO
WE
LL
, MA
(A
TT
EN
DIN
G
AM
TA
BO
AR
D M
EE
TIN
G A
T E
VE
NT
, TR
IP C
OS
TS
PA
RT
IAL
LY
RE
IMB
UR
SE
D B
Y
AM
TA
)3
00
30
0
PA
TE
L M
AY
20
21
AM
TA
WO
RK
SH
OP
AN
D B
OA
RD
ME
ET
ING
, SE
AT
TL
E, W
A
(JU
ST
AT
TE
ND
ING
AM
TA
BO
AR
D M
EE
TIN
G A
T E
VE
NT
, TR
IP C
OS
TS
P
AR
TIA
LL
Y R
EIM
BU
RS
ED
BY
AM
TA
)3
00
30
0
PA
TE
L O
CT
OB
ER
2-6
, 20
20
WE
FT
EC
, NE
W O
RL
EA
NS
, LA
(P
OS
SIB
LE
PR
E
CO
NF
ER
EN
CE
WO
RK
SH
OP
SP
EA
KE
R)
2,0
00
2
,00
0
P
AT
EL
SE
PT
EM
BE
R 1
3-1
6, 2
02
0 W
AT
ER
EU
SE
NA
TIO
NA
L C
ON
FE
RE
NC
E,
DE
NV
ER
, CO
2,0
00
2
,00
0
N
EE
LY
SW
RC
B W
WO
CP
AD
VIS
OR
Y C
OM
MIT
TE
E M
EE
TIN
GS
(S
AC
RA
ME
NT
O)
1,0
00
1
,00
0
B
AR
RIE
R P
ER
SO
NN
EL
NG
WA
GW
WE
EK
DE
C 2
02
0 A
ND
TR
I-S
TA
TE
SE
MIN
AR
A
UG
20
20
LA
S V
EG
AS
, NV
2,0
00
2
,00
0
O
PE
RA
TIO
NS
WO
RK
SH
OP
/CO
NF
ER
EN
CE
AT
TE
ND
AN
CE
4,0
00
4
,00
0
C
WE
A A
NN
UA
L C
ON
FE
RE
NC
E A
PR
IL 2
02
1 (
2),
MA
INT
EN
AN
CE
(S
AN
DIE
GO
)
1
,50
0
1,5
00
EM
ER
SO
N U
SE
R C
ON
FE
RE
NC
E (
PH
OE
NIX
, AZ
) (2
)
4
,00
0
4,0
00
MA
INT
EN
AN
CE
CW
EA
LO
CA
L S
EC
TIO
N T
RIS
TA
TE
CO
NF
ER
EN
CE
AU
G 2
02
0
3,0
00
3
,00
0
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
-
23
,40
0
-
-
-
-
-
-
-
-
-
-
2
3,4
00
10
50
.53
00
1P
RO
FE
SS
ION
AL
SE
RV
ICE
S-G
EN
ER
AL
C
ON
SU
LT
ING
SE
RV
ICE
S G
WR
S P
RO
CE
SS
OP
TIM
IZA
TIO
N (
SP
I)7
5,0
00
7
5,0
00
P
RO
FE
SS
ION
AL
SE
RV
ICE
S-G
EN
ER
AL
TO
TA
L-
7
5,0
00
-
-
-
-
-
-
-
-
-
-
75
,00
0
10
50
.51
50
1O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
BL
UE
PR
INT
AN
D C
OP
IES
2,0
00
2,0
00
OF
FIC
E F
UR
NIT
UR
E2
,00
0
2
,50
0
4,5
00
O
FF
ICE
SU
PP
LIE
S9
,10
0
4
00
9
,50
0
C
HA
IR/F
LO
OR
MA
TS
FO
R A
WP
F C
ON
TR
OL
RO
OM
RE
PL
AC
EM
EN
TS
1,2
00
1,2
00
RE
PL
AC
EM
EN
T O
FF
ICE
CH
AIR
S (
4)
1,6
00
1,6
00
AD
OB
E P
RO
FE
SS
ION
AL
2,0
00
2
,00
0
O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L T
OT
AL
-
17
,90
0
40
0
-
-
2,5
00
-
-
-
-
-
-
2
0,8
00
10
50
.51
51
0H
AR
DW
AR
E/S
OF
TW
AR
EP
CS
SY
ST
EM
SO
FT
WA
RE
SU
PP
OR
T (
EM
ER
SO
N G
UA
RD
IAN
)6
0,1
00
6
0,1
00
P
CS
SY
ST
EM
HA
RD
WA
RE
10
,00
0
10
,00
0
LA
B B
UIL
DIN
G B
MS
SY
ST
EM
HA
RD
WA
RE
/SO
FT
WA
RE
UP
GR
AD
E
5
,00
0
5,0
00
AD
OB
E P
RO
FE
SS
ION
AL
50
0
50
0
HA
RD
WA
RE
/SO
FT
WA
RE
TO
TA
L-
7
0,1
00
-
50
0
-
-
5,0
00
-
-
-
-
-
7
5,6
00
10
50
.51
52
0G
AS
& D
IES
EL
FU
EL
FU
EL
12
,00
0
11
,00
0
3
,00
0
2
6,0
00
G
AS
& D
IES
EL
FU
EL
TO
TA
L-
1
2,0
00
-
11
,00
0
3
,00
0
-
-
-
-
-
-
-
2
6,0
00
10
50
.51
53
0U
NIF
OR
MS
& S
AF
ET
Y
BO
TT
LE
D W
AT
ER
AS
RE
QU
IRE
D IN
TR
EA
TM
EN
T A
RE
A4
,50
0
4,5
00
JAC
KE
TS
, PO
LO
SH
IRT
S, R
AIN
GE
AR
7,0
00
7,0
00
DIS
TR
ICT
SU
PP
LIE
D U
NIF
OR
MS
40
,00
0
40
,00
0
UN
IFO
RM
S &
SA
FE
TY
TO
TA
L-
5
1,5
00
-
-
-
-
-
-
-
-
-
-
5
1,5
00
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-2
9FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.57
00
1M
AIN
TE
NA
NC
E -
SU
PP
LIE
S &
MA
TE
RIA
L -
EL
EC
TR
ICA
L/IN
ST
RU
ME
NT
AT
ION
MIS
C M
OT
OR
, PU
MP
WA
RE
HO
US
E S
UP
PL
IES
5,0
00
1,0
00
75
0
1,2
50
8
,00
0
P
LA
NT
UP
S S
YS
TE
M R
EP
AIR
S6
,50
0
1
,00
0
5
00
8,0
00
E
LE
CT
RIC
AL
WA
RE
HO
US
E S
UP
PL
IES
4,5
00
1,0
00
50
0
6
,00
0
IN
ST
RU
ME
NT
AT
ION
PA
RT
S A
ND
SU
PP
LIE
S
9
,50
0
3,0
00
1,0
00
1
3,5
00
LIG
HT
ING
& E
ME
RG
EN
CY
, LIG
HT
SU
PP
LIE
S3
,00
0
1
,00
0
2
00
50
0
4,7
00
OF
FIC
E E
LE
CT
RIC
AL
& L
IGH
TIN
G R
EP
AIR
S2
,00
0
1
,00
0
5
00
3
,50
0
M
AIN
TE
NA
NC
E -
SU
PP
LIE
S &
MA
TE
RIA
L -
EL
EC
TR
ICA
L/IN
ST
RU
ME
NT
AT
ION
TO
TA
L-
3
0,5
00
4
,00
0
2
,00
0
2
,75
0
3
,45
0
1,0
00
-
-
-
-
-
4
3,7
00
10
50
.57
00
4M
AIN
TE
NA
NC
E -
SU
PP
LIE
S &
MA
TE
RIA
LB
AR
RIE
R F
IEL
D E
QU
IPM
EN
T R
EP
AIR
SU
PP
LIE
S2
,00
0
2
,00
0
B
OT
TL
ED
GA
S N
ITR
OG
EN
EC
T F
OR
BA
RR
IER
, OP
TIO
NS
& M
AIN
TE
NA
NC
E
50
0
3,2
00
7
50
4
,45
0
E
QU
IPM
EN
T A
ND
ST
RU
CT
UR
E R
EP
AIR
S S
UP
PL
IES
5,5
00
3
,00
0
2,5
00
2
,50
0
13
,50
0
EQ
UIP
ME
NT
LU
BR
ICA
TIO
N S
UP
PL
IES
1
4,0
00
2
,00
0
2,0
00
3
,00
0
21
,00
0
FE
NC
ING
AN
D S
EC
UR
ITY
GA
TE
RE
PA
IRS
3,0
00
1
,50
0
2
,00
0
6
,50
0
G
AS
KE
TS
, BE
AR
ING
S, A
ND
GE
AR
S W
AR
EH
OU
SE
SU
PP
LIE
S
8
,50
0
5
00
1
,00
0
2,0
00
1
2,0
00
H
AR
DW
AR
E S
UP
PL
IES
FO
R B
UIL
DIN
GS
AN
D P
RO
CE
SS
ES
9,0
00
1
,00
0
1,0
00
3
,00
0
1,5
00
1
5,5
00
IR
RIG
AT
ION
SU
PP
LIE
S
2,0
00
1
,00
0
5
,00
0
2
,00
0
10
,00
0
JAN
ITO
RIA
L S
UP
PL
IES
9,5
00
9,5
00
AD
MIN
INS
TA
TIO
N, L
AB
OR
AT
OR
Y &
AN
NE
X R
EP
AIR
S
6
,00
0
5,0
00
1
1,0
00
L
AN
DS
CA
PE
SU
PP
LIE
S3
,00
0
3
,00
0
L
UM
BE
R, P
AIN
T, H
AR
DW
AR
E S
UP
PL
IES
3,5
00
2
,50
0
6,0
00
PIP
E A
ND
SU
PP
LIE
S
9
,00
0
1
0,0
00
4
,00
0
3,0
00
2
6,0
00
P
VC
PIP
E R
EP
AIR
S A
ND
SU
PP
LIE
S
7
,50
0
6,0
00
1
,00
0
3,0
00
1
7,5
00
S
IGN
AG
E S
UP
PL
IES
5,5
00
5
,50
0
2,0
00
1,0
00
1
4,0
00
S
I TE
FA
CIL
ITY
PA
INT
ING
/SU
PP
LIE
S
7
,00
0
4,5
00
2
,00
0
13
,50
0
ST
RU
CT
UR
E B
LD
G R
EP
AIR
S M
ISC
8,0
00
1
,00
0
6,0
00
3
,00
0
3,0
00
2
1,0
00
W
EL
DIN
G M
AT
ER
IAL
(S
HE
ET
ME
TA
L, S
TA
INL
ES
S, A
NG
LE
IRO
N)
1
0,0
00
6
,00
0
3,0
00
3
,00
0
4,0
00
2
,50
0
28
,50
0
SU
MP
PU
MP
RE
PL
AC
EM
EN
T E
LE
CT
RIC
AL
MA
NH
OL
ES
5
,00
0
1,0
00
1
,00
0
1,5
00
8
,50
0
W
EL
DIN
G S
UP
PL
IES
6,0
00
50
0
1,0
00
2
,00
0
9,5
00
US
FL
AG
S3
,00
0
3
,00
0
E
NG
INE
ER
ING
RE
SE
AR
CH
CE
NT
ER
PA
RT
S6
,00
0
6
,00
0
M
AIN
TE
NA
NC
E -
SU
PP
LIE
S &
MA
TE
RIA
L T
OT
AL
-
10
4,0
00
3
1,0
00
1
4,7
00
63
,50
0
3
4,7
50
13
,00
0
-
-
1,0
00
-
-
2
61
,95
0
10
50
.57
00
6M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
CO
MM
UN
ICA
TIO
NR
EP
AIR
AN
D R
EP
LA
CE
ME
NT
OF
HA
ND
HE
LD
AN
D C
AR
RA
DIO
S1
,50
0
8
00
7
00
3,0
00
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- C
OM
MU
NIC
AT
ION
TO
TA
L-
1
,50
0
-
80
0
-
70
0
-
-
-
-
-
-
3
,00
0
10
50
.57
00
8M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
CA
RT
SR
EP
AIR
OF
CA
RT
S3
,50
0
12
,00
0
15
,50
0
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- C
AR
TS
TO
TA
L3
,50
0
12
,00
0
-
-
-
-
-
-
-
-
-
-
1
5,5
00
10
50
.57
01
0M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
VE
HIC
LE
SM
AIN
TE
NA
NC
E O
F A
LL
VE
HIC
LE
S IN
OC
WD
FV
PO
OL
40
,00
0
4
0,0
00
P
AIN
T A
ND
BO
DY
RE
PA
IR O
F P
OO
L V
EH
ICL
ES
5,0
00
5
,00
0
S
OF
TW
AR
E U
PG
RA
DE
VE
HIC
LE
SC
AN
NE
R2
,00
0
2,0
00
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- V
EH
ICL
ES
TO
TA
L4
7,0
00
-
-
-
-
-
-
-
-
-
-
-
4
7,0
00
10
50
.57
01
2M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
TM
AIN
TE
NA
NC
E O
F H
EA
VY
EQ
UIP
ME
NT
FO
R W
AT
ER
PR
OD
UC
TIO
N4
,00
0
4
,00
0
M
AIN
TE
NA
NC
E O
F L
AR
GE
AIR
CO
MP
RE
SS
OR
FO
R IN
JEC
TIO
N W
EL
LS
2,0
00
2,0
00
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- H
EA
VY
EQ
UIP
ME
NT
TO
TA
L-
4
,00
0
-
2,0
00
-
-
-
-
-
-
-
-
6,0
00
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
11-3
0
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.57
01
6M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
T -
OU
TS
IDE
SE
RV
ICE
S
FV
SIT
E B
UIL
DIN
G R
EP
AIR
S
4,0
00
3,5
00
2,5
00
10
,00
0
RO
OF
RE
PA
IRS
1
,30
0
2,5
00
20
0
1,0
00
5
,00
0
A
NN
UA
L IN
SP
EC
TIO
N/R
EP
AIR
OF
RP
PD
5,0
00
2
,50
0
3,0
00
1
0,5
00
P
LA
NT
WID
E C
RA
NE
SE
RV
ICE
AN
D IN
SP
EC
TIO
N
14
,50
0
2,5
00
1,5
00
1
8,5
00
C
ON
CR
ET
E R
EP
AIR
S &
CO
RE
DR
ILL
ING
2,0
00
5
00
5
00
3
,00
0
E
LE
VA
TO
R Y
EA
RL
Y IN
SP
EC
TIO
N A
ND
CE
RT
IFIC
AT
ION
(M
F, R
O, A
NN
EX
&
4,0
00
8
,00
0
3,0
00
1
5,0
00
F
IRE
SP
RIN
KL
ER
SE
RV
ICE
WE
T A
ND
DR
Y Q
UA
RT
ER
LY
AN
D A
NN
UA
L T
ES
T
1
2,0
00
5
,00
0
2,0
00
1
9,0
00
F
IRE
EX
TIN
QU
ISH
ER
SE
RV
ICE
PM
6,0
00
6
,00
0
L
AB
OR
AT
OR
Y F
IRE
AL
AR
M S
ER
VIC
E6
,00
0
6
,00
0
F
V S
ITE
FIR
E A
LA
RM
SE
RV
ICE
/RE
PA
IR
9,0
00
4
,00
0
1
3,0
00
H
VA
C &
AIR
HA
ND
LIN
G P
RE
VE
NT
IVE
MA
INT
GW
RS
& F
V O
FF
ICE
S
2
4,0
00
30
,00
0
2,0
00
15
,00
0
71
,00
0
HV
AC
& A
IR H
AN
DL
ING
RE
PA
IRS
GW
RS
AN
D F
V S
ITE
OF
FIC
ES
13
,00
0
8,0
00
2
,00
0
23
,00
0
HV
AC
LA
B P
M/R
EP
AIR
INC
LU
DE
S P
HO
EN
IX A
ND
AN
DO
VE
R C
ON
TR
OL
S &
B
OIL
ER
S
35
,00
0
35
,00
0
JAN
ITO
RIA
L S
ER
VIC
E G
WR
S, F
V, L
AB
BL
DS
& W
IND
OW
S (
PL
AN
T W
IDE
) IN
CL
UD
ES
SH
AR
ED
MW
DO
C
14
1,8
00
1
41
,80
0
GW
RS
EX
TE
RIO
R P
AN
EL
MA
INT
EN
AN
CE
5,0
00
5
,00
0
E
ME
RG
EN
CY
JA
NIT
OR
IAL
SE
RV
ICE
S &
CA
RP
ET
CL
EA
NIN
G
4
,00
0
4,0
00
LA
ND
SC
AP
E S
ER
VIC
ES
INC
LU
DIN
G S
HA
RE
D M
WD
OC
4
9,0
00
4
9,0
00
T
RE
E T
RIM
MIN
G S
ER
VIC
E
1
2,0
00
1
2,0
00
IN
DO
OR
PL
AN
T S
ER
VIC
ES
3,8
00
3
,80
0
E
XT
ER
MIN
AT
OR
PE
ST
CO
NT
RO
L S
ER
VIC
ES
3
,00
0
6,0
00
9
,00
0
R
AIN
BO
W D
ISP
OS
AL
TR
AS
H P
ICK
UP
INC
LU
DE
S S
HA
RE
D M
WD
OC
6,0
00
51
,00
0
57
,00
0
SIT
E S
TR
EE
T S
WE
EP
ING
5
,00
0
5,0
00
ME
DIU
M V
OL
TA
GE
VF
D A
NN
UA
L P
M (
VF
D C
OU
NT
INC
RE
AS
ED
FR
OM
27
TO
35
,50
0
35
,50
0
MO
TO
R C
ON
TR
OL
CE
NT
ER
PM
2,0
00
1
,00
0
1,0
00
4
,00
0
M
ED
IUM
VO
LT
AG
E D
IST
RIB
UT
OR
& S
WIT
CH
GE
AR
PM
& O
IL T
ES
TIN
G
20
,15
0
20
,15
0
ME
DIU
M V
OL
TA
GE
DIS
TR
IBU
TO
R &
SW
ITC
HG
EA
R P
M R
EP
AIR
S 2
0%
OF
PM
4,0
30
4
,03
0
N
FP
A S
AF
ET
Y E
QU
IPM
EN
T C
ER
TIF
ICA
TIO
N/T
ES
TIN
G
4
,50
0
4,5
00
NIS
T C
ER
TIF
ICA
TIO
N C
AL
IBR
AT
ION
EL
EC
TR
ICA
L S
HO
P E
QU
IPM
EN
T
2
,00
0
2,0
00
GW
RS
EM
ER
GE
NC
Y G
EN
ER
AT
OR
S Q
UA
RT
ER
LY
INS
PE
CT
ION
& L
OA
D T
ES
T
5,5
00
5
,50
0
M
OT
OR
OIL
AN
AL
YS
IS
5,0
00
3
,00
0
8, 0
00
MO
TO
R V
IBR
AT
ION
AN
AL
YS
IS
3,0
00
1
,00
0
4,0
00
PL
UM
BIN
G S
ER
VIC
E B
UIL
DIN
GS
1,5
00
3
,00
0
1,5
00
1
,00
0
1
,00
0
8,0
00
PU
MP
MIS
C IN
SP
EC
TIO
N A
ND
MO
DIF
ICA
TIO
N
2
,00
0
1,5
00
3
,50
0
R
EP
AIR
ST
AIN
LE
SS
ST
EE
L V
AL
VE
, FIT
TIN
GS
AN
D M
ISC
PIP
ES
2,0
00
50
0
1,0
00
3
,50
0
R
EP
AIR
/INS
PE
CT
ION
OF
AIR
VA
C A
ND
PR
ES
S R
EL
IEF
& B
F V
AL
VE
S
2
,00
0
8
00
1
,50
0
4,3
00
US
A O
UT
SO
UR
CE
UN
DE
RG
RO
UN
D S
ER
VIC
E A
LE
RT
S
22
,00
0
16
,00
0
37
,00
0
75
,00
0
US
A N
OT
IFIC
AT
ION
RE
QU
ES
T F
EE
6,0
00
4
,00
0
10
,00
0
ST
OC
KIN
G M
AIN
TE
NA
NC
E P
AR
TS
CA
GE
3
,50
0
1,5
00
1
,00
0
1,5
00
1
,50
0
9,0
00
WIN
DO
W A
ND
DO
OR
RE
PA
IRS
AN
D S
UP
PL
IES
3,0
00
50
0
1,5
00
50
0
5,5
00
VIB
RA
LIG
N C
AL
IBR
AT
ION
& S
ER
VIC
E
2
,00
0
2,0
00
AN
NU
AL
GA
RA
GE
DO
OR
MA
INT
EN
AN
CE
2
,50
0
1,0
00
3
,50
0
F
UM
E H
OO
D C
ER
TIF
ICA
TIO
N
50
0
5,0
00
5
,50
0
U
E S
YS
TE
MS
UL
TR
AS
ON
IC C
AL
IBR
AT
ION
SE
RV
ICE
1,0
00
1
,00
0
V
AC
TO
R T
RU
CK
SE
RV
ICE
FO
R S
CR
EE
NIN
GS
SU
MP
, ST
OR
M D
RA
INS
ON
SIT
E
3
,00
0
1,0
00
4
,00
0
C
HE
MIC
AL
TR
EA
TM
EN
T F
OR
HO
T W
AT
ER
LO
OP
S F
OR
AD
MIN
AN
D L
AB
2,0
00
2
,00
0
B
C W
IRE
RO
PE
FA
LL
PR
OT
EC
TIO
N E
QU
IPM
EN
T IN
SP
EC
TIO
N C
ER
TIF
ICA
TIO
N
3
,00
0
1,0
00
50
0
4,5
00
SU
NB
EL
T C
ON
TR
OL
S -
1 Y
EA
R S
ER
VIC
E C
ON
TR
AC
T F
OR
NE
W A
DM
IN H
VA
C
SO
FT
WA
RE
CO
NT
RO
L S
YS
TE
M6
,00
0
6,0
00
MA
INT
EN
AN
CE
ST
RU
CT
UR
E A
ND
IMP
RO
VE
ME
NT
- O
UT
SID
E S
ER
VIC
ES
TO
TA
L-
2
39
,48
0
1,5
00
20
,30
0
3
61
,60
0
62
,20
0
7
0,5
00
-
-
1
,00
0
-
-
75
6,5
80
10
50
.57
04
4M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
T -
GW
RS
SC
RE
EN
ING
SS
CR
EE
NIN
GS
PM
15
,00
0
15
,00
0
MA
INT
EN
AN
CE
ST
RU
CT
UR
E A
ND
IMP
RO
VE
ME
NT
- G
WR
S S
CR
EE
NIN
GS
TO
TA
L-
1
5,0
00
-
-
-
-
-
-
-
-
-
-
15
,00
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
11-3
1
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.57
03
1M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
T -
GW
RS
MIC
RO
FIL
TR
AT
ION
MF
BA
CK
WA
SH
PU
MP
PM
5,5
00
5,5
00
MF
FIL
TR
AT
E P
UM
P P
M
9
,50
0
2,0
00
1
1,5
00
M
F P
UM
P V
FD
PM
/RE
PA
IRS
1
4,0
00
80
0
14
,80
0
MF
PC
S E
QU
IPM
EN
T
5,0
00
50
0
5,5
00
MF
CH
EM
ICA
L P
UM
PS
9,5
00
2
,00
0
11
,50
0
MF
INS
TR
UM
EN
TA
TIO
N P
M
6
,50
0
1,0
00
7
,50
0
M
F C
HL
OR
INE
AN
AL
YZ
ER
PM
(IN
CL
UD
ES
$1
80
0 F
OR
PO
TA
SS
IUM
IOD
IDE
)
7
,50
0
1,0
00
8
,50
0
M
F P
IPE
RE
PA
IRS
2
1,0
00
50
0
21
,50
0
MF
CO
MP
RE
SS
OR
PM
1
0,0
00
1
0,0
00
M
F B
LO
WE
R P
M
13
,00
0
13
,00
0
MF
CH
EM
ICA
L S
UM
P P
UM
P R
EP
AIR
S
5
,00
0
5,0
00
MF
HO
RIB
A A
MM
ON
IA A
NA
LY
ZE
R R
EP
AIR
S A
ND
CA
LIB
RA
TIO
N
3
,00
0
3,0
00
MF
VA
LV
E/A
CT
UA
TO
R P
M
33
,00
0
3,0
00
3
6,0
00
T
RA
NS
FE
R P
UM
P, B
AC
KW
AS
H P
UM
P A
ND
VA
LV
E P
M
15
,50
0
15
,50
0
MIS
C M
F E
LE
ME
NT
RE
PL
AC
EM
EN
T N
ON
WA
RR
AN
TY
/TE
ST
ING
OF
NE
W
(MA
NU
FA
CT
UR
ER
S)
EL
EM
EN
T A
PP
RO
X. 1
8 E
LE
ME
NT
S @
$6
90
EA
CH
5,0
00
5,0
00
MA
INT
EN
AN
CE
ST
RU
CT
UR
E A
ND
IMP
RO
VE
ME
NT
- G
WR
S M
ICR
OF
ILT
RA
TIO
N T
OT
AL
-
15
8,0
00
1
5,8
00
-
-
-
-
-
-
-
-
-
1
73
,80
0
10
50
.57
03
2M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S R
EV
ER
SE
OS
MO
SIS
R
O F
EE
D P
UM
P P
M
25
,00
0
4,0
00
29
,00
0
RE
PL
AC
E 4
ME
CH
AN
ICA
L S
EA
LS
RO
FE
ED
PU
MP
S
15
,00
0
15
,00
0
RO
AC
ID P
UM
P P
M
6
,00
0
1,0
00
7,0
00
RO
VF
D P
M
6
,00
0
6,0
00
RO
PC
S E
QU
IPM
EN
T
6
,00
0
6,0
00
RO
INS
TR
UM
EN
TA
TIO
N P
M
6
,00
0
5,0
00
11
,00
0
AN
NU
AL
AM
MO
NIA
AN
AL
YZ
ER
SE
NS
OR
RE
PL
AC
EM
EN
T
2
,70
0
2,7
00
RO
PR
ES
SU
RE
VE
SS
EL
EN
D C
AP
OR
ING
RE
PL
AC
EM
EN
T
12
,00
0
12
,00
0
RO
PIP
E R
EP
AIR
S
25
,00
0
5,0
00
30
,00
0
RE
PL
AC
ING
RO
CL
EA
NIN
G P
VC
PIP
E
2
5,0
00
2
5,0
00
T
OC
AN
AL
YZ
ER
CH
EM
ICA
LS
/MIS
C.
1
2,0
00
1
2,0
00
T
OC
AN
AL
YZ
ER
PM
(IN
CR
EA
SE
NU
MB
ER
OF
AN
LY
ZE
RS
IN P
LA
NT
FR
OM
2 T
O
4)
2
7,0
00
2
7,0
00
R
O V
AL
VE
AC
TU
AT
OR
PM
1
0,0
00
1
0,0
00
M
ISC
RO
ME
MB
RA
NE
S (
FU
LL
-SC
AL
E E
VA
LU
AT
ION
S)
8,0
00
5
,00
0
1
3,0
00
M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S R
EV
ER
SE
OS
MO
SIS
TO
TA
L-
1
85
,70
0
20
,00
0
-
-
-
-
-
-
-
-
-
20
5,7
00
10
50
.57
03
8M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S U
V S
YS
TE
M
UV
CH
EM
ICA
L P
UM
P P
M
6
,00
0
6,0
00
UV
PC
S E
QU
IPM
EN
T
3,5
00
3
,50
0
UV
INS
TR
UM
EN
T P
M
4
,00
0
4,0
00
U
V L
AM
P A
SS
EM
BL
Y P
M O
RIN
GS
EN
D A
DA
PT
ER
S
6
,00
0
6,0
00
UV
BA
LL
AS
TS
10
,00
0
10
,00
0
U
V L
AM
P R
EP
LA
CE
ME
NT
AN
D S
PA
RE
S (
$1
70
/LA
MP
, 34
60
LA
MP
S IN
20
17
+5
00
6
00
,00
0
60
0,0
00
UV
LA
MP
RE
CY
LC
LIN
G F
EE
1
1,0
00
1
1,0
00
U
V Q
UA
RT
Z S
LE
EV
ES
1
0,0
00
1
0,0
00
U
V T
RA
NS
MIT
TA
NC
E M
ET
ER
PM
2,5
00
2
,50
0
UV
VA
LV
E A
CT
UA
TO
R P
M3
,00
0
3
,00
0
M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S U
V S
YS
TE
M T
OT
AL
-
65
6,0
00
-
-
-
-
-
-
-
-
-
-
65
6,0
00
10
50
.57
04
6M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S L
IME
SY
ST
EM
LIM
E M
IXIN
G E
QU
IPM
EN
T P
M8
,50
0
8
,50
0
P
OL
YM
ER
EQ
UIP
ME
NT
6
,50
0
6,5
00
LIM
E IN
ST
RU
ME
NT
AT
ION
3,5
00
3,5
00
LIM
E L
OO
P P
UM
P P
M /
SL
AK
ER
PM
9,0
00
9,0
00
LIM
E S
LU
RR
Y L
OO
P O
PT
IMIZ
AT
ION
2,5
00
2,5
00
LIM
E 4
INC
H S
LU
DG
E L
INE
PL
UM
BIN
G P
M
10
,00
0
10
,00
0
LIM
E S
OL
IDS
HA
UL
ING
2,0
00
2,0
00
LIM
E V
AL
VE
PM
4,5
00
4,5
00
MA
INT
EN
AN
CE
ST
RU
CT
UR
E/IM
PR
OV
EM
EN
T -
GW
RS
LIM
E S
YS
TE
M T
OT
AL
-
44
,00
0
2,5
00
-
-
-
-
-
-
-
-
-
46
,50
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
2FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.57
04
8M
AIN
T S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S P
RO
DU
CT
WT
R P
UM
P S
TA
TIO
NV
FD
PM
3,5
00
3,5
00
MO
TO
R P
M3
,00
0
3
,00
0
S
PL
IT S
EA
L R
EP
LA
CE
ME
NT
(2
SE
AL
S)
8,0
00
8
,00
0
P
UM
P P
M1
0,0
00
1
0,0
00
V
AL
VE
PM
6,0
00
6,0
00
INS
TR
UM
EN
TA
TIO
N P
M3
,00
0
3
,00
0
M
AIN
T S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
WR
S P
RO
DU
CT
WA
TE
R P
UM
P S
TA
TIO
N T
OT
AL
-
33
,50
0
-
-
-
-
-
-
-
-
-
-
3
3,5
00
10
50
.57
03
4M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- G
RE
EN
AC
RE
S P
RO
JEC
TG
AP
EF
FL
UE
NT
PU
MP
VF
D P
M3
,50
0
3,5
00
GA
P E
FF
LUE
NT
MO
TO
R P
M4
,00
0
4,0
00
GA
P E
FF
LU
EN
T P
UM
P P
M3
,00
0
3,0
00
GA
P B
AC
KW
AS
H P
UM
P P
M1
,00
0
1,0
00
GA
P C
HE
MIC
AL
PU
MP
PM
1,5
00
1
,50
0
GA
P F
LO
CC
UL
AT
OR
PM
4,0
00
4
,00
0
G
AP
PC
S R
EP
AIR
S2
,50
0
2,5
00
GA
P C
L2
AN
AL
YZ
ER
PM
2,5
00
2
,50
0
GA
P IN
ST
RU
ME
NT
PM
3,0
00
3
,00
0
GA
P P
IPIN
G R
EP
AIR
S1
,50
0
1,5
00
G
AP
VA
LV
E P
M
3,0
00
3
,00
0
G
AP
AIR
VA
C A
ND
PIP
EL
INE
EM
ER
GE
NC
Y R
EP
AIR
S8
,00
0
8,0
00
GA
P C
HL
OR
INE
MIX
ER
RE
PA
IRS
2,0
00
2
,00
0
G
AP
GR
AV
ITY
FIL
TE
R S
UR
VE
ILL
AN
CE
INS
PE
CT
ION
20
,00
0
2
0,0
00
V
AC
UU
M T
RU
CK
TO
CL
EA
N B
W S
UM
P1
3,0
00
13
,00
0
MA
INT
EN
AN
CE
ST
RU
CT
UR
E/IM
PR
OV
EM
EN
T -
GR
EE
N A
CR
ES
PR
OJ
EC
T T
OT
AL
-
-
-
-
-
7
2,5
00
-
-
-
-
-
-
72
,50
0
10
50
.57
03
6M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
/IMP
RO
VE
ME
NT
- IN
JEC
TIO
N W
EL
LS
INJE
CT
ION
WE
LL
INS
TR
UM
EN
T P
M4
,00
0
4
,00
0
R
EH
AB
ILIT
AT
E U
P T
O 2
3 IN
EC
TIO
N W
EL
LS
10
0,0
00
1
00
,00
0
IN
JEC
TIO
N W
EL
L P
CS
PM
4,0
00
4,0
00
RE
PA
IR &
RE
CA
LIB
RA
TIO
N O
F F
LO
W M
ET
ER
S/IN
ST
RU
ME
NT
S/9
MA
G M
ET
ER
S2
,50
0
1
,00
0
3,5
00
RE
PA
IR A
CC
ES
S H
AT
CH
ES
AN
D V
AU
LT
S2
5,0
00
25
,00
0
RE
PA
IR O
F D
OW
N-H
OL
E V
AL
VE
S A
ND
BF
PU
MP
S2
0,0
00
20
,00
0
RE
PA
IR/IN
SP
EC
TIO
N O
F S
EB
10
INC
H B
AC
K F
LO
W P
RE
VE
NT
ION
2,0
00
2,0
00
RE
PL
AC
EM
EN
T P
AR
TS
AN
D S
UP
PL
IES
FO
R B
AR
RIE
R3
0,0
00
30
,00
0
RE
PA
IR S
TA
INL
ES
S S
TE
EL
VA
LV
E, F
ITT
ING
S A
ND
MIS
C P
IPE
S5
,00
0
5
,00
0
R
EP
AIR
/INS
PE
CT
ION
OF
AIR
VA
C A
ND
PR
ES
S R
EL
IEF
& B
F V
AL
VE
S4
,00
0
4
,00
0
IN
JEC
TIO
N W
EL
L S
UM
P P
UM
P P
M3
,50
0
3
,50
0
B
AR
RIE
R F
IEL
D E
QU
IPM
EN
T S
UP
PL
IES
RE
PA
IRS
2, 0
00
2,0
00
MA
INT
EN
AN
CE
FE
ES
TO
MA
INT
AIN
M-2
6 D
AT
A L
OG
GE
R4
20
4
20
M
AIN
TE
NA
NC
E F
OR
3 L
AS
ER
TU
RB
IDIT
Y M
ET
ER
S1
,50
0
1
,50
0
P
AT
RIC
AL
CO
UN
TE
R M
AIN
TE
NA
NC
E
1,2
00
1,2
00
MA
INT
EN
AN
CE
ST
RU
CT
UR
E/IM
PR
OV
EM
EN
T -
INJ
EC
TIO
N W
EL
LS
TO
TA
L-
-
-
20
5,1
20
-
-
-
-
-
-
-
1,0
00
2
06
,12
0
10
50
.51
54
0C
AR
TR
IDG
E F
ILT
ER
S -
RE
VE
RS
E O
SM
OS
IS
RE
PL
AC
EM
EN
T O
F R
O P
RE
TR
EA
TM
EN
T F
ILT
ER
S 3
RE
PL
AC
EM
EN
TS
OF
14
H
OU
SIN
G W
ITH
28
3 F
ILT
ER
S E
AC
H3
5,0
00
35
,00
0
CA
RT
RID
GE
FIL
TE
RS
- R
EV
ER
SE
OS
MO
SIS
TO
TA
L-
3
5,0
00
-
-
-
-
-
-
-
-
-
-
35
,00
0
10
50
.51
54
5S
MA
LL
TO
OL
ST
OO
LS
OP
ER
AT
ION
S
1,5
00
30
0
1,0
00
2,8
00
BIC
YC
LE
S F
OR
OP
ER
AT
ION
S2
,50
0
2
,50
0
T
OO
L B
OX
RE
TR
OF
ITS
FO
R B
UR
DE
N C
AR
TS
8,0
00
8,0
00
FL
AM
MA
BL
E L
OC
KE
R S
TO
RA
GE
CA
BIN
ET
S6
,00
0
6
,00
0
TO
OL
S M
AIN
TE
NA
NC
E2
,50
0
1
,00
0
1
,00
0
1
,50
0
6
,00
0
T
OO
LS
I&E
3,0
00
3,0
00
INS
TR
UM
EN
T S
HO
P C
AL
IBR
AT
ION
EQ
UIP
ME
NT
3
,20
0
1
,50
0
4
, 70
0
S
PE
CIA
LIZ
ED
TO
OL
S F
OR
TR
EA
TM
EN
T P
RO
CE
SS
AR
EA
S4
,50
0
4
,50
0
S
MA
LL
TO
OL
S T
OT
AL
-
31
,20
0
1,3
00
3,5
00
1,5
00
-
-
-
-
-
-
-
37
,50
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
3FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.51
55
0S
AF
ET
Y S
UP
PL
IES
TR
AF
FIC
SA
FE
TY
SU
PP
LIE
S
1,0
00
1,0
00
2,0
00
CO
NF
INE
D S
PA
CE
GA
S D
ET
EC
TO
RS
2,5
00
1,5
00
4,0
00
CO
NF
INE
D S
PA
CE
BL
OW
ER
S
1,5
00
50
0
2,0
00
CO
NF
INE
D S
PA
CE
RE
SC
UE
EQ
UIP
ME
NT
4,0
00
50
0
50
0
5
,00
0
P
PE
FO
R E
MP
LO
YE
ES
3,0
00
20
0
3,2
00
FU
LL
FA
CE
RE
SP
IRA
TO
RS
1
,00
0
1
,00
0
R
ES
PIR
AT
OR
FIL
TE
RS
1,5
00
1,5
00
SC
BA
TE
ST
ING
RE
PA
IR2
,00
0
2
,00
0
S
AF
ET
Y E
QU
IPM
EN
T F
OR
12
KV
EL
EC
TR
ICA
L S
YS
TE
M P
M A
ND
EM
ER
GE
NC
Y
TE
ST
ING
2,5
00
2
,50
0
S
PIL
L C
ON
TA
INM
EN
T S
UP
PL
IES
4
,00
0
50
0
4,5
00
SA
FE
TY
AN
D O
PE
RA
TIO
N S
IGN
S1
,00
0
2
00
5
00
1
,70
0
S
AF
ET
Y S
UP
PL
IES
TO
TA
L-
2
4,0
00
9
00
4
,00
0
-
5
00
-
-
-
-
-
-
29
,40
0
1
05
0.5
70
40
MA
INT
ST
RU
CT
UR
E/IM
PR
OV
-GR
EE
N A
CR
ES
INF
LU
EN
T P
UM
P S
TA
TIO
N
INS
TR
UM
EN
TA
TIO
N P
M7
50
75
0
VF
D P
M7
50
75
0
MO
TO
R P
M7
50
75
0
PU
MP
PM
7
50
75
0
V
AL
VE
AC
TU
AT
OR
PM
50
0
5
00
VA
LV
E P
M5
00
50
0
MA
INT
ST
RU
CT
UR
E/IM
PR
OV
EM
EN
T -
GR
EE
N A
CR
ES
INF
LU
EN
T P
UM
P S
TA
TIO
N T
OT
AL
-
-
-
-
-
4
,00
0
-
-
-
-
-
-
4,0
00
1
05
0.5
70
42
MA
INT
EN
AN
CE
- S
AN
TA
AN
A R
ES
ER
VO
IR
CH
EM
ICA
L P
UM
P P
M5
00
50
0
IN
ST
RU
ME
NT
AT
ION
PM
7
50
75
0
MO
TO
R P
M7
50
75
0
P
UM
P P
M
75
0
7
50
VA
LV
E M
OT
OR
AC
TU
AT
OR
PM
1,5
00
1
,50
0
VA
LV
E P
M7
50
75
0
MA
INT
EN
AN
CE
- S
AN
TA
AN
A R
ES
ER
VO
IR T
OT
AL
-
-
-
-
-
5
,00
0
-
-
-
-
-
-
5,0
00
1
05
0.5
40
01
CH
EM
ICA
LS
- C
HL
OR
INE
(N
O T
AX
)G
WR
S S
OD
IUM
HY
PO
CH
LO
RIT
E (
15
,50
0 T
ON
S)
- (U
NIT
PR
ICE
INC
RE
AS
E)
2,0
00
,00
0
2
,00
0
2
,00
2,0
00
G
AP
INF
LU
EN
T A
ND
CL
CO
NT
AC
T S
OD
IUM
HY
PO
CH
LO
RIT
E (
12
75
TO
NS
)1
50
,00
0
15
0,0
00
CH
EM
ICA
LS
- C
HL
OR
INE
TO
TA
L-
2
,00
0,0
00
2,0
00
-
-
15
0,0
00
-
-
-
-
-
-
2
,15
2,0
00
10
50
.54
06
0C
HE
MIC
AL
S -
AN
HY
DR
OU
S A
MM
ON
IA (
TA
X)
GA
P C
L C
ON
TA
CT
AM
MO
NIA
5
,00
0
5,0
00
CH
EM
ICA
LS
- A
NH
YD
RO
US
AM
MO
NIA
TO
TA
L-
-
-
-
-
5,0
00
-
-
-
-
-
-
5
,00
0
10
50
.54
04
5C
HE
MIC
AL
S -
PO
ST
TR
EA
TM
EN
T H
YD
RA
TE
D L
IME
(N
O T
AX
)H
YD
RA
TE
D L
IME
(4
,05
0 T
ON
S)
- (U
NIT
PR
ICE
INC
RE
AS
E)
84
0,0
00
8
40
,00
0
C
HE
MIC
AL
S -
PO
ST
TR
EA
TM
EN
T H
YD
RA
TE
D L
IME
TO
TA
L
-
84
0,0
00
-
-
-
-
-
-
-
-
-
-
84
0,0
00
10
50
.54
05
0C
HE
MIC
AL
S -
HY
DR
OG
EN
PE
RO
XID
E U
V (
NO
TA
X)
HY
DR
OG
EN
PE
RO
XID
E U
V (
95
0 T
ON
S)
38
5,0
00
3
85
,00
0
C
HE
MIC
AL
S -
HY
DR
OG
EN
PE
RO
XID
E U
V T
OT
AL
-
3
85
,00
0
-
-
-
-
-
-
-
-
-
-
3
85
,00
0
10
50
.54
05
5C
HE
MIC
AL
S -
SO
DIU
M B
ISU
LF
ITE
(T
AX
)S
OD
IUM
BIS
UL
FIT
E R
O F
LU
SH
AN
D S
AR
DIS
CH
AR
GE
(2
5 T
ON
S)
10
,00
0
10
,00
0
CH
EM
ICA
LS
- S
OD
IUM
BIS
UL
FIT
E T
OT
AL
-
10
,00
0
-
-
-
-
-
-
-
-
-
-
1
0,0
00
10
50
.54
01
5C
HE
MIC
AL
S -
PO
LY
ME
R (
TA
X)
AN
ION
IC P
OL
YM
ER
LIM
E S
AT
UR
AT
OR
(1
7 T
ON
S)
- (U
NIT
PR
ICE
INC
RE
AS
E)
45
,00
0
45
,00
0
CH
EM
ICA
LS
- P
OL
YM
ER
TO
TA
L-
4
5,0
00
-
-
-
-
-
-
-
-
-
-
45
,00
0
1
05
0.5
40
20
CH
EM
ICA
LS
- G
WR
S R
EV
ER
SE
OS
MO
SIS
SU
LF
UR
IC A
CID
(N
O T
AX
)S
UL
FU
RIC
AC
ID O
PE
RA
TIN
G W
ITH
SE
AS
ON
AL
AD
JUS
TM
EN
TS
BE
TW
EE
N P
H
(2,9
00
TO
NS
) 6
.9 P
H (
UN
IT P
RIC
E IN
CR
EA
SE
AN
D O
CS
D W
AT
ER
QU
AL
ITY
)
37
3,5
00
1
,50
0
3
75
,00
0
CH
EM
ICA
LS
- G
WR
S R
EV
ER
SE
OS
MO
SIS
SU
LF
UR
IC A
CID
TO
TA
L-
3
73
,50
0
1,5
00
-
-
-
-
-
-
-
-
-
37
5,0
00
10
50
.54
02
5C
HE
MIC
AL
S -
GW
RS
RE
VE
RS
E O
SM
OS
IS A
NT
ISC
AL
AN
T (
NO
TA
X)
RO
AN
TIS
CA
LA
NT
(4
70
TO
NS
) -
(UN
IT P
RIC
E IN
CR
EA
SE
)7
00
,00
0
70
0,0
00
CH
EM
ICA
LS
- G
WR
S R
EV
ER
SE
OS
MO
SIS
AN
TIS
CA
LA
NT
TO
TA
L-
7
00
,00
0
-
-
-
-
-
-
-
-
-
-
7
00
,00
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
4FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.54
03
0C
HE
MIC
AL
S -
GW
RS
MF
CL
EA
NIN
G C
HE
MIC
AL
S (
TA
X)
MF
ME
MB
RA
NE
CL
EA
NIN
G C
HE
MIC
AL
S C
AU
ST
IC (
62
5 T
ON
S)
- (U
NIT
PR
ICE
IN
CR
EA
SE
)3
40
,00
0
34
0,0
00
M
F M
EM
BR
AN
E C
LE
AN
ING
CH
EM
ICA
LS
CIT
RIC
(6
25
TO
NS
) -
(UN
IT P
RIC
E
INC
RE
AS
E)
4
64
,00
0
46
4,0
00
M
F P
RO
PR
IET
AR
Y C
LE
AN
ING
CH
EM
ICA
L S
TU
DY
1,0
00
1,0
00
MF
ME
MC
LE
AN
(3
4 T
ON
S)
35
,00
0
35
,00
0
CH
EM
ICA
LS
- G
WR
S M
F C
LE
AN
ING
CH
EM
ICA
LS
TO
TA
L-
8
39
,00
0
1,0
00
-
-
-
-
-
-
-
-
-
84
0,0
00
10
50
.54
03
3C
HE
MIC
AL
S -
GW
RS
RO
CL
EA
NIN
G C
HE
MIC
AL
S (
TA
X)
RO
ME
MB
RA
NE
GE
NE
RIC
CL
EA
NIN
G C
HE
MIC
AL
S C
LE
AN
ING
S (
63
TO
NS
)
2
00
,00
0
1,5
00
20
1,5
00
RO
ME
MB
RA
NE
CIT
RIC
(5
0 T
ON
S)
4
5,0
00
4
5,0
00
RO
ME
MB
RA
NE
CA
US
TIC
(2
5 T
ON
S)
1
6,0
00
1
6,0
00
R
O M
EM
BR
AN
E D
DB
S C
LE
AN
ING
S (
6.3
TO
NS
)
40
,00
0
40
,00
0
RO
CL
EA
NIN
G C
HE
MIC
AL
ST
UD
Y5
00
5
00
R
O M
EM
BR
AN
E P
RO
PR
IET
AR
Y C
LE
AN
ING
CH
EM
ICA
LS
3 S
TA
GE
CL
EA
NIN
GS
11
0,0
00
5
00
1
10
,50
0
C
HE
MIC
AL
S -
GW
RS
RO
CL
EA
NIN
G C
HE
MIC
AL
S T
OT
AL
-
41
1,0
00
2
,50
0
-
-
-
-
-
-
-
-
-
4
13
,50
0
10
50
.54
04
0C
HE
MIC
AL
S G
AP
AL
UM
PR
ET
RE
AT
ME
NT
CO
AG
UL
AN
T (
21
TO
NS
)8
,00
0
8,0
00
CH
EM
ICA
LS
GA
P A
LU
M T
OT
AL
-
-
-
-
-
8
,00
0
-
-
-
-
-
-
8,0
00
10
50
.51
55
5L
AB
SU
PP
LIE
SC
AL
IBR
AT
ION
ST
AN
DA
RD
S F
OR
BA
RR
IER
FIE
LD
EQ
UIP
ME
NT
20
,00
0
60
0
20
,60
0
C
HE
MIC
AL
S A
ND
SU
PP
LIE
S
2,5
00
2,5
00
LA
BO
RA
TO
RY
DI W
AT
ER
SY
ST
EM
1,4
00
1,4
00
PE
RO
XID
E A
ND
CH
LO
RIN
E T
ES
T S
TR
IPS
2,5
00
2,5
00
2 N
EW
HA
ND
HE
LD
EC
PH
ME
TE
RS
2,0
00
2,0
00
LA
B S
UP
PL
IES
TO
TA
L-
2
8,4
00
-
60
0
-
-
-
-
-
-
-
-
29
,00
0
10
50
.51
56
0L
AB
SA
MP
LE
S A
NA
LY
SIS
GE
NE
RA
L L
AB
AN
AL
YS
IS B
Y O
UT
SID
E L
AB
3,0
00
2,0
00
5,0
00
LA
B S
AM
PL
ES
AN
AL
YS
IS T
OT
AL
-
3,0
00
2,0
00
-
-
-
-
-
-
-
-
-
5,0
00
10
50
.51
56
5R
EN
T E
QU
IPM
EN
T-
GE
NE
RA
LR
EN
TA
L O
F E
QU
IPM
EN
T F
OR
PM
PR
OJE
CT
S5
,00
0
5
,00
0
R
EN
T E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
-
5,0
00
-
-
-
-
-
-
-
-
-
-
5
,00
0
10
50
.54
50
1U
TIL
ITIE
S -
EL
EC
TR
ICIT
Y (
OF
FS
ITE
& M
ISC
EL
EC
TR
ICA
L M
ET
ER
S)
G
AP
CA
TH
OD
IC P
RO
TE
CT
ION
5,0
00
5
,00
0
GA
P D
EE
P W
EL
L W
AT
ER
EL
EC
TR
ICIT
Y
40
,00
0
40
,00
0
G
AP
INF
LU
EN
T P
UM
PIN
G E
LE
CT
RIC
ITY
2
4,0
00
2
4,0
00
GA
P S
AN
TA
AN
A R
ES
ER
VO
IR P
UM
P S
TA
TIO
N P
OW
ER
(C
NE
/SC
E)
1
40
,00
0
14
0,0
00
EW
-1 W
EL
L P
OW
ER
30
,00
0
30
,00
0
MID
BA
SIN
INJE
CT
ION
WE
LL
S (
5 W
EL
LS
)
6
2,0
00
6
2,0
00
T
AL
BE
RT
BA
RR
IER
INJE
CT
ION
WE
LL
S1
2,0
00
12
,00
0
UT
ILIT
IES
- E
LE
CT
RIC
ITY
(O
FF
SIT
E &
MIS
C E
LE
CT
RIC
AL
ME
TE
RS
) T
OT
AL
-
-
-
1
2,0
00
-
20
9,0
00
-
-
-
-
3
0,0
00
6
2,0
00
3
13
,00
0
10
50
.54
50
5U
TIL
ITIE
S -
EL
EC
TR
ICIT
Y (
66
KV
FV
SIT
E S
CE
) 9
7,0
00
AF
AD
MIN
BL
DG
EL
EC
TR
ICIT
Y
3
9,0
00
3
9,0
00
MW
DO
C B
LD
G E
LE
CT
RIC
ITY
2
6,0
00
2
6,0
00
GA
P E
LE
CT
RIC
ITY
2
80
,00
0
28
0,0
00
WA
RE
HO
US
E, A
NN
EX
& M
AIN
TE
NA
NC
E S
HO
PS
1
84
,00
0
18
4,0
00
LA
BO
RA
TO
RY
20
0,0
00
20
0,0
00
SC
RE
EN
ING
S
12
,40
0
12
,40
0
MIC
RO
FIL
TR
AT
ION
3
,10
0,0
00
3
,10
0,0
00
R
EV
ER
SE
OS
MO
SIS
5
,32
0,3
37
5
,32
0,3
37
U
V S
YS
TE
M E
LE
CT
RIC
ITY
85
0,0
00
8
50
,00
0
D
EC
AR
B
1
10
,00
0
11
0,0
00
CH
EM
ICA
L F
EE
D/L
IME
SY
ST
EM
2
3,0
00
2
3,0
00
P
RO
DU
CT
WA
TE
R P
UM
P S
TA
TIO
N
2,5
00
,00
0
2,5
00
,00
0
BA
RR
IER
PU
MP
ST
AT
ION
52
0,0
00
5
20
,00
0
U
TIL
ITIE
S -
EL
EC
TR
ICIT
Y (
66
KV
FV
SIT
E S
CE
) 1
03
,00
0 A
F T
OT
AL
-
12
,61
9,7
37
-
-
34
5,0
00
-
2
00
,00
0
-
-
-
-
-
13
,16
4,7
37
1
05
0.5
45
05
.25
0U
TIL
ITIE
S E
LE
CT
RIC
AL
CU
RT
AIL
ME
NT
PO
WE
R C
RE
DIT
SE
ST
IMA
TE
D P
AY
ME
NT
S E
NE
L X
$8
00
,00
0
(80
0,0
00
)
(8
00
,00
0)
UT
ILIT
IES
EL
EC
TR
ICA
L C
UR
TA
ILM
EN
T P
OW
ER
CR
ED
ITS
TO
TA
L-
(8
00
,00
0)
-
-
-
-
-
-
-
-
-
-
(8
00
,00
0)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
5FY
202
0-21
Bud
get R
epor
t
De
scrip
tion
G
en
era
l G
WR
Sys
tem
O&
M
Pro
cess
O
ptim
iza
tion
T
alb
ert
B
arr
ier
O&
M
FV
Fa
cilit
yO
&M
G
AP
O&
M
La
b
Ma
inte
na
nce
A
lam
itos
Ba
rrie
r O
&M
F
ore
ba
y O
&M
M
WD
OC
E
W1
M
BI
AC
TIV
ITY
CO
DE
99
00
99
22
99
52
99
08
99
01
99
11
99
74
99
32
99
20
99
70
17
11
99
90
JDE
Acc
ou
nt
Nu
mb
er
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WA
TE
R P
RO
DU
CT
ION
(10
50)
To
tal
10
50
.54
51
0U
TIL
ITIE
S -
GA
S
NA
TU
RA
L G
AS
FO
R H
VA
C O
FF
ICE
S &
AN
NE
X B
UIL
DIN
G7
,00
0
7
,00
0
N
AT
UR
AL
GA
S F
OR
LA
BO
RA
TO
RY
4
6,0
00
4
6,0
00
U
TIL
ITIE
S -
GA
S T
OT
AL
-
-
-
-
7
,00
0
-
4
6,0
00
-
-
-
-
-
53
,00
0
10
50
.54
51
5U
TIL
ITIE
S -
WA
TE
RP
OT
AB
LE
WA
TE
R A
ND
IND
US
TR
IAL
WA
TE
R6
0,0
00
6
0,0
00
U
TIL
ITIE
S -
WA
TE
R T
OT
AL
-
60
,00
0
-
-
-
-
-
-
-
-
-
-
6
0,0
00
10
50
.51
10
2M
EM
BE
RS
HIP
S/C
ER
TIF
ICA
TIO
N F
EE
SM
EH
UL
- W
EF
, AW
WA
, AS
CE
ME
MB
ER
SH
IP F
EE
S8
00
2
00
1
,00
0
JA
NIC
E -
IAA
P M
EM
BE
RS
HIP
(C
AP
CE
RT
RE
NE
WA
L)
15
0
15
0
JUS
TIN
- N
GW
A1
15
1
15
OP
ER
AT
OR
& M
AIN
TE
NA
NC
E C
ER
TIF
ICA
TIO
N F
EE
S (
$1
90
0 M
OR
E F
OR
OP
S)
12
,00
0
1
2,0
00
M
EM
BE
RS
HIP
S/C
ER
TIF
ICA
TIO
N F
EE
S T
OT
AL
-
12
,95
0
20
0
11
5
-
-
-
-
-
-
-
-
13
,26
5
10
50
.51
19
2T
EC
HN
ICA
L T
RA
ININ
GD
EL
TA
V P
RO
CE
SS
CO
NT
RO
L T
RA
ININ
G (
2 N
EW
SE
NIO
R T
EC
HS
)7
,20
0
7
,20
0
I&
E M
ED
IUM
VO
LT
AG
E S
AF
ET
Y T
RA
ININ
G C
LA
SS
ES
2
,00
0
2
,00
0
M
AN
AG
EM
EN
T T
RA
ININ
G1
,50
0
1
,50
0
M
AIN
TE
NA
NC
E T
RA
ININ
G4
, 00
0
4
,00
0
A
DM
INIS
TR
AT
IVE
CE
RT
IFIC
AT
ION
25
0
25
0
WP
G T
RA
ININ
G L
IBR
AR
Y
40
0
40
0
OP
ER
AT
OR
CE
RT
IFIC
AT
ION
CL
AS
SE
S2
,50
0
2
,50
0
O
N S
ITE
O&
M T
EC
HN
ICA
L T
RA
ININ
G1
,50
0
1
,50
0
C
RA
NE
TR
AIN
ING
/RIG
GIN
G A
ND
SIG
NA
LIN
G2
,00
0
2
,00
0
U
LT
RA
SO
NIC
MO
NIT
OR
TR
AIN
ING
& C
ER
TIF
ICA
TIO
N2
,50
0
2
,50
0
C
SR
T T
RA
ININ
G5
,00
0
5
,00
0
W
AT
ER
DIS
TR
IBU
TIO
N T
RA
ININ
G B
AR
RIE
R S
TA
FF
50
0
50
0
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L-
2
8,4
50
4
00
5
00
-
-
-
-
-
-
-
-
2
9,3
50
10
50
.51
11
2S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
CO
NS
UL
TIN
G S
ER
VIC
E P
ER
MIT
S2
,00
0
2
,00
0
SC
AQ
MD
AN
D C
ITY
PE
RM
IT F
EE
S
14
,00
0
14
,00
0
CIR
Y O
F F
OU
NT
AIN
VA
LL
EY
EN
CH
RO
AC
HM
EN
T P
ER
MIT
S4
,20
0
4
,20
0
UN
ITE
D P
AR
CE
L S
ER
VIC
E
1,0
00
1,0
00
OR
AN
GE
CO
UN
TY
PU
BL
IC F
AC
ILIT
IES
PE
RM
IT1
1,0
00
11
,00
0
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
-
17
,00
0
-
1
5,2
00
-
-
-
-
-
-
-
-
32
,20
0
10
50
.56
02
6L
AD
PW
CU
RR
EN
T E
XP
EN
SE
LA
DP
W B
AR
RIE
R
1,1
00
,00
0
1,1
00
,00
0
LA
DP
W C
UR
RE
NT
EX
PE
NS
E T
OT
AL
-
-
-
-
-
-
-
1,1
00
,00
0
-
-
-
-
1,1
00
,00
0
WA
TE
R P
RO
DU
CT
ION
GR
AN
D T
OT
AL
1,2
07
,09
8
2
4,7
13
,30
3
29
3,7
39
68
7,5
80
1
,41
1,4
91
1,3
92
,15
7
4
56
,30
9
1
,14
7,5
52
1
68
,30
4
9
1,8
85
7
8,6
88
5
72
,51
8
3
2,2
20
,62
5
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
6FY
202
0-21
Bud
get R
epor
t
JD
E
AC
CO
UN
T
NU
MB
ER
D
ES
CR
IPT
ION
G
ener
al
GW
RS
F
oreb
ay O
&M
P
rado
O&
M
Mai
nt.
Rub
ber
Dam
& T
rash
Rac
k
Mai
nt. B
urris
Pum
p S
tn
Mai
nt.
San
tiago
B
asin
Mai
nt.
War
ner
Bas
in
Mai
nt.
Ana
heim
La
ke
Mai
nt. M
iller
B
asin
Mai
nt.
Kra
emer
B
asin
Mai
nt. M
ira
Lom
a B
asin
M
aint
. La
Pal
ma
Bas
in
Mai
nt. L
a Jo
lla B
ain
A
CT
IVIT
Y C
OD
E99
0099
2299
2099
2419
0319
0419
0519
0619
0719
0819
0919
101
911
1912
SA
LAR
IES
AN
D B
EN
EF
ITS
1060
.501
04R
EG
ULA
R S
ALA
RIE
S32
3,99
7
33,9
70
64
6,49
6
15
8,24
0
77,8
55
84
,715
88,9
46
83
,422
93,6
15
81
,327
58,4
65
62
,555
62,5
55
62
,555
1,91
8,71
2
1060
.501
06O
VE
RT
IME
16,8
81
53
,451
11,1
52
9,
547
9,87
1
8,
669
7,74
9
8,
337
7,62
8
6,
110
6,34
6
6,
346
6,34
6
15
8,43
1
1060
.502
10P
AY
RO
LL T
AX
4,94
3
493
10,1
49
2,
456
1,26
7
1,
371
1,41
5
1,
322
1,47
8
1,
290
936
99
9
999
99
9
30,1
19
1060
.502
02R
ET
IRE
ME
NT
56,7
56
5,
656
11
6,54
1
28
,204
14,5
52
15
,749
16,2
53
15
,180
16,9
75
14
,811
10,7
52
11
,472
11,4
72
11
,472
345,
844
1060
.502
04H
EA
LTH
INS
UR
AN
CE
65,1
42
5,
236
12
1,67
8
29
,737
15,1
14
18
,831
19,7
63
18
,319
18,4
41
15
,267
10,9
89
11
,300
11,3
00
11
,300
372,
417
1060
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N8,
820
1,
077
21
,624
5,25
2
2,
670
2,89
4
3,
003
2,80
8
3,
144
2,73
9
1,
982
2,11
7
2,
117
2,11
7
62
,364
SA
LA
RIE
S A
ND
BE
NE
FIT
S T
OT
AL
476,
540
46
,431
969,
938
235,
041
12
1,00
5
133,
431
13
8,04
9
128,
799
14
1,99
1
123,
061
89
,234
94,7
89
94
,789
94,7
89
2,
887,
887
1060
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S
SC
AD
A M
AIN
TE
NA
NC
E A
ND
TE
CH
NO
LOG
Y2,
500
2,
500
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
TO
TA
L-
-
2,
500
-
-
-
-
-
-
-
-
-
-
-
2,
500
1060
.530
15T
EM
PO
RA
RY
LA
BO
R
LAB
OR
TO
INC
LUD
E W
EE
D A
BA
TM
EN
T45
,000
45,0
00
TE
MP
OR
AR
Y L
AB
OR
TO
TA
L-
-
45
,000
-
-
-
-
-
-
-
-
-
-
-
45,0
00
1060
.513
01T
RA
VE
L
TR
I-S
TA
TE
- S
PE
AK
ER
JO
HN
BO
NS
AN
GU
E1,
300
1,
300
TR
I-S
TA
TE
DO
N H
OU
LIH
AN
1,30
0
1,30
0
TR
AV
EL
TO
TA
L-
-
2,
600
-
-
-
-
-
-
-
-
-
-
-
2,
600
1060
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
B
AS
IC O
FF
ICE
SU
PP
LIE
S (
XE
RO
X P
AP
ER
, IN
K C
AR
T.,
CA
LEN
DA
RS
, B
AT
TE
RIE
S, M
AIL
ING
), K
ITC
HE
N S
UP
PLI
ES
2,00
0
2,00
0
KO
NIC
A/M
INO
LTA
CO
PIE
R E
XP
EN
SE
S55
0
55
0
C
AT
ER
ING
ME
ET
ING
S (
CO
RP
S.,
TR
AIN
ING
)5,
000
5,
000
O
FF
ICE
FU
RN
ITU
RE
(M
OU
NT
ING
LA
RG
E M
AP
S)
1,50
0
1,50
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L9,
050
-
-
-
-
-
-
-
-
-
-
-
-
-
9,
050
1060
.515
10S
CA
DA
HA
RD
WA
RE
/SO
FT
WA
RE
SU
PP
OR
T W
ON
DE
RW
AR
E
SY
ST
EM
HA
RW
AR
E A
ND
SO
FT
WA
RE
4,
500
4,
500
SC
AD
A H
AR
DW
AR
E/S
OF
TW
AR
E S
UP
PO
RT
WO
ND
ER
WA
RE
TO
TA
L-
-
4,
500
-
-
-
-
-
-
-
-
-
-
-
4,
500
1060
.515
20F
UE
L -
GA
SO
LIN
E
G
AS
OLI
NE
28,0
00
28
,000
FU
EL
- G
AS
OL
INE
TO
TA
L-
-
28
,000
-
-
-
-
-
-
-
-
-
-
-
28,0
00
1060
.515
21F
UE
L -
OF
F R
OA
D
DIE
SE
L F
UE
L (O
FF
-RO
AD
)60
,000
60,0
00
FU
EL
- O
FF
RO
AD
TO
TA
L-
-
60
,000
-
-
-
-
-
-
-
-
-
-
-
60,0
00
1060
.515
30U
NIF
OR
MS
U
NIF
OR
M S
ER
VIC
ES
, SH
IRT
S/J
AC
KE
TS
10,8
00
10
,800
UN
IFO
RM
S T
OT
AL
-
-
10,8
00
-
-
-
-
-
-
-
-
-
-
-
10
,800
1060
.570
01M
AIN
TE
NA
NC
E-S
UP
PLI
ES
& M
AT
ER
IAL-
ELE
CT
/INS
TR
UM
EN
TA
TIO
N
MIS
C M
OT
OR
, PU
MP
WA
RE
HO
US
E S
UP
PLI
ES
3,50
0
3,50
0
UP
S S
YS
TE
M R
EP
AIR
S1,
000
1,
000
ELE
CT
RIC
AL
WA
RE
HO
US
E S
UP
PLI
ES
2,00
0
2,00
0
INS
TR
UM
EN
TA
TIO
N P
AR
TS
AN
D S
UP
PLI
ES
4,00
0
4,00
0
LIG
HT
ING
& E
ME
RG
EN
CY
, LIG
HT
SU
PP
LIE
S1,
000
1,
000
O
FF
ICE
ELE
CT
RIC
AL
& L
IGH
TIN
G R
EP
AIR
S1,
000
1,
000
MA
INT
.-S
UP
PL
IES
& M
AT
ER
IAL
-EL
EC
T/IN
ST
RU
ME
NT
AT
ION
TO
TA
L-
-
12
,500
-
-
-
-
-
-
-
-
-
-
-
12,5
00
1060
.570
06M
AIN
TE
NA
NC
E E
QU
IPM
EN
T C
OM
MU
NIC
AT
ION
R
EP
AIR
AN
D R
EP
LAC
EM
EN
T O
F M
OB
ILE
RA
DIO
S1,
500
1,
500
M
ON
ITO
R R
EP
LAC
EM
EN
TS
1,50
0
1,50
0
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
CO
MM
UN
ICA
TIO
N T
OT
AL
-
-
3,00
0
-
-
-
-
-
-
-
-
-
-
-
3,00
0
1060
.570
10M
AIN
TE
NA
NC
E E
QU
IPM
EN
T V
EH
ICLE
S
T
RU
CK
SC
HE
DU
LED
AN
D U
NS
CH
ED
ULE
D R
EP
AIR
S, T
IRE
S, B
ELT
S, E
TC
. 30
,000
30,0
00
AN
NA
UL
DIA
GN
OS
TIC
SO
FT
WA
RE
UP
DA
TE
500
500
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
VE
HIC
LE
S T
OT
AL
-
-
30,5
00
-
-
-
-
-
-
-
-
-
-
-
30
,500
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
CH
AR
GE
OP
ER
AT
ION
S (
1060
)
Tot
al
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
7FY
202
0-21
Bud
get R
epor
t
JD
E
AC
CO
UN
T
NU
MB
ER
D
ES
CR
IPT
ION
G
ener
al
GW
RS
F
oreb
ay O
&M
P
rado
O&
M
Mai
nt.
Rub
ber
Dam
& T
rash
Rac
k
Mai
nt. B
urris
Pum
p S
tn
Mai
nt.
San
tiago
B
asin
Mai
nt.
War
ner
Bas
in
Mai
nt.
Ana
heim
La
ke
Mai
nt. M
iller
B
asin
Mai
nt.
Kra
emer
B
asin
Mai
nt. M
ira
Lom
a B
asin
M
aint
. La
Pal
ma
Bas
in
Mai
nt. L
a Jo
lla B
ain
A
CT
IVIT
Y C
OD
E99
0099
2299
2099
2419
0319
0419
0519
0619
0719
0819
0919
101
911
1912
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
CH
AR
GE
OP
ER
AT
ION
S (
1060
)
Tot
al
1060
.570
12M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T
G
EN
ER
AL
HE
AV
Y E
QU
IPM
EN
T P
M A
ND
RE
PA
IRS
35,0
00
35
,000
AN
NU
AL
ET
DIA
GN
OS
ITIC
SO
FT
WA
RE
FO
R C
AT
1,50
0
1,50
0
AN
NU
AL
ET
DIA
GN
OS
TIC
SO
FT
WA
RE
FO
R J
OH
N D
EE
R3,
000
3,
000
PA
RT
S U
ND
ER
CA
RR
IAG
E R
EP
AIR
S20
,000
20,0
00
PA
RT
S F
OR
HE
AV
Y E
QU
IPM
EN
T G
RO
UN
D E
NG
AG
ING
TO
OLS
25,0
00
25
,000
OIL
AN
D L
UB
RIC
AN
T15
,000
15,0
00
OIL
AN
ALY
SIS
4,00
0
4,00
0
OF
F R
OA
D T
IRE
S6,
500
6,
500
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- H
EA
VY
EQ
UIP
ME
NT
TO
TA
L-
-
11
0,00
0
-
-
-
-
-
-
-
-
-
-
-
11
0,00
0
1060
.570
16M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
TS
- G
EN
ER
AL
G
EN
ER
AL
MA
INT
EN
AN
CE
PA
RT
S &
RE
PA
IRS
8,00
0
8,00
0
F
ISH
DIS
PO
SA
L (2
CLE
AN
ING
S)
10,0
00
10
,000
F
LOW
ME
TE
R A
ND
INS
TR
UM
EN
TA
TIO
N M
AIN
TE
NA
NC
E12
,000
12,0
00
MO
TO
R A
CT
UA
TO
R/L
IMIT
OR
QU
E S
ER
VIC
E25
,000
25,0
00
F
EN
CE
RE
PA
IR30
,000
30,0
00
MO
TO
R V
IBR
AT
ION
AN
ALY
SIS
2,
000
2,
000
F
HQ
AN
D F
RL
BU
ILD
ING
S H
VA
C P
M A
ND
RE
PA
IRS
5,00
0
4,00
0
9,00
0
FH
Q 9
AIR
CO
MP
RE
SS
OR
S P
M A
ND
CE
RT
IFIC
AT
ION
1,
500
1,
500
FH
Q C
RA
NE
INS
PE
CT
ION
4,50
0
4,50
0
LAN
DS
CA
PE
MA
INT
EN
AN
CE
/TR
EE
TR
IMM
ING
60
,000
60,0
00
LAN
DS
CA
PE
MA
INT
EN
AN
CE
/WE
ED
AB
AT
EM
EN
T W
AR
NE
R B
AS
IN60
,000
60,0
00
LAN
DS
CA
PE
MA
INT
EN
AN
CE
/WE
ED
AB
AT
EM
EN
T S
AN
TIA
GO
BIK
E T
RA
IL45
,000
45,0
00
LAN
DS
CA
PE
MA
INT
EN
AN
CE
/MU
LCH
25
,000
25,0
00
AN
NU
AL
SM
ITH
BA
SIN
SLO
P C
LEA
RIN
G
15,0
00
15
,000
US
T S
ER
VIC
E10
,000
10,0
00
G
AS
ES
(W
ES
TA
IR)
3,00
0
3,00
0
P
AIN
TIN
G S
TR
UC
TU
RE
S5,
000
5,
000
JAN
ITO
RIA
L30
,000
30,0
00
PLA
NT
SE
RV
ICE
1,50
0
1,50
0
INS
EC
T/R
OD
EN
T C
ON
TR
OL
15,0
00
15
,000
PO
RT
AB
LE R
ES
TR
OO
M R
EN
TA
LS1,
500
1,
500
MA
INT
EN
AN
CE
ST
RU
CT
UR
E A
ND
IMP
RO
VE
ME
NT
S -
GE
NE
RA
L T
OT
AL
5,00
0
-
24
8,00
0
-
-
-
60
,000
60,0
00
-
-
-
-
-
-
37
3,00
0
1060
.570
19R
EC
HA
RG
E S
YS
TE
M A
ND
PIP
ELI
NE
CA
TH
OD
IC P
RO
TE
CT
ION
CA
TH
OD
IC P
RO
TE
CT
ION
SY
ST
EM
PM
AN
D R
EP
AIR
S
10,0
00
10
,000
RE
CH
AR
GE
SY
ST
EM
AN
D P
IPE
LIN
E C
AT
HO
DIC
PR
OT
EC
TIO
N T
OT
AL
-
-
10,0
00
-
-
-
-
-
-
-
-
-
-
-
10
,000
1060
.570
17M
AIN
TE
NA
NC
E
TR
AS
H R
AC
K IM
PE
RIA
L 2,
500
2,50
0
RU
BB
ER
DA
M IM
PE
RIA
L1,
500
1,50
0
TR
AS
H R
AC
K 5
CO
VE
S5,
500
5,50
0
RU
BB
ER
DA
M 5
CO
VE
S1,
500
1,50
0
LA J
OLL
A T
RA
SH
RA
CK
500
50
0
INS
TR
UM
EN
TA
TIO
N P
M1,
500
1,50
0
1,
000
800
1,
000
1,00
0
1,
000
1,00
0
1,
000
1,00
0
10
,800
VA
LVE
AN
D A
CT
UA
TO
R P
M50
0
800
20
0
500
2,
500
1,00
0
1,
000
1,00
0
1,
000
1,00
0
9,
500
PU
MP
AN
D M
OT
OR
PM
1,00
0
50
0
500
3,
000
1,00
0
1,
500
500
50
0
500
9,
000
VF
D A
ND
SO
FT
ST
AR
T P
M1,
500
1,50
0
AIR
VA
C P
M30
0
250
15
0
250
25
0
250
25
0
250
25
0
2,20
0
FLO
W M
ET
ER
PM
500
30
0
100
50
0
300
30
0
200
20
0
250
2,
650
SU
RG
E T
AN
K P
M2,
500
2,50
0
15' F
LUM
E C
ALI
BR
AT
ION
- R
EQ
UIR
ED
BY
ST
AT
E W
AT
ER
BO
AR
D4,
400
4,40
0
HV
AC
PM
AN
D B
UIL
DIN
G F
ILT
ER
CH
AN
GE
2,00
0
2,
000
SO
FT
ST
AR
T P
M50
0
500
MA
INT
EN
AN
CE
TO
TA
L-
-
-
-
17,9
00
10
,100
2,75
0
2,
050
7,25
0
3,
550
4,05
0
2,
950
2,95
0
3,
000
56,5
50
1060
.515
45S
MA
LL T
OO
LS
M
AIN
TE
NA
NC
E A
ND
HY
DR
OG
RA
PH
Y O
PE
RA
TIO
NS
2,00
0
2,00
0
M
AIN
TE
NA
NC
E O
PE
RA
TIO
NS
2,50
0
2,50
0
S
MA
LL T
OO
LS F
OR
H.E
. ME
CH
AN
IC &
MA
INT
EN
AN
CE
3,50
0
3,50
0
SM
AL
L T
OO
LS
TO
TA
L-
-
8,
000
-
-
-
-
-
-
-
-
-
-
-
8,
000
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
8FY
202
0-21
Bud
get R
epor
t
JD
E
AC
CO
UN
T
NU
MB
ER
D
ES
CR
IPT
ION
G
ener
al
GW
RS
F
oreb
ay O
&M
P
rado
O&
M
Mai
nt.
Rub
ber
Dam
& T
rash
Rac
k
Mai
nt. B
urris
Pum
p S
tn
Mai
nt.
San
tiago
B
asin
Mai
nt.
War
ner
Bas
in
Mai
nt.
Ana
heim
La
ke
Mai
nt. M
iller
B
asin
Mai
nt.
Kra
emer
B
asin
Mai
nt. M
ira
Lom
a B
asin
M
aint
. La
Pal
ma
Bas
in
Mai
nt. L
a Jo
lla B
ain
A
CT
IVIT
Y C
OD
E99
0099
2299
2099
2419
0319
0419
0519
0619
0719
0819
0919
101
911
1912
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
RE
CH
AR
GE
OP
ER
AT
ION
S (
1060
)
Tot
al
1060
.515
50S
AF
ET
Y S
UP
PLI
ES
SA
FE
TY
EQ
UIP
ME
NT
, I.E
., S
AF
ET
Y G
OG
GLE
S, G
LOV
ES
, RE
SP
IRA
TO
RS
, E
AR
PR
OT
EC
TO
RS
, AIR
MO
NIT
OR
ING
, TR
AF
FIC
, AN
D C
ON
FIN
ED
SP
AC
E
EQ
UIP
ME
NT
5,00
0
5,00
0
CO
NF
INE
D S
PA
CE
SA
FE
TY
EQ
UIP
ME
NT
2,00
0
2,00
0
SA
FE
TY
SU
PP
LIE
S T
OT
AL
-
-
7,00
0
-
-
-
-
-
-
-
-
-
-
-
7,00
0
1060
.540
10H
ER
BIC
IDE
/CH
EM
ICA
LS
H
ER
BIC
IDE
(W
EE
D K
ILLE
R)
4,00
0
4,00
0
HE
RB
ICID
E/C
HE
MIC
AL
S T
OT
AL
-
-
4,00
0
-
-
-
-
-
-
-
-
-
-
-
4,00
0
1060
.515
65R
EN
T E
QU
IPM
EN
T -
GE
NE
RA
L
T
RE
NC
HE
RS
, TA
MP
ER
S, D
EW
AT
ER
ING
EQ
UIP
ME
NT
, E
TC
.1,
500
1,
500
RE
NT
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L-
-
1,
500
-
-
-
-
-
-
-
-
-
-
-
1,
500
1060
.515
70R
EN
T E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T
RE
NT
AL
CR
AN
E, M
AN
LIF
T, S
CR
AP
ER
S, E
TC
.6,
000
6,
000
R
EN
T E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T T
OT
AL
-
-
6,00
0
-
-
-
-
-
-
-
-
-
-
-
6,00
0
1060
.545
01U
TIL
ITIE
S -
ELE
CT
RIC
ITY
AN
AH
EIM
LA
KE
DE
WA
TE
R/T
RA
NS
FE
R
60,0
00
60
,000
BU
RR
IS B
AS
IN P
UM
P S
TA
TIO
N (
WE
T Y
EA
R C
OS
T)
300,
000
300,
000
KR
AE
ME
R/M
ILLE
R P
UM
PS
45
,000
45,0
00
S
AN
TIA
GO
BA
SIN
PU
MP
ST
AT
ION
45,0
00
45
,000
W
AR
NE
R P
UM
PS
25
,000
25,0
00
A
LL O
TH
ER
(R
UB
BE
R D
AM
S, F
HQ
, VA
LVE
S, M
ET
ER
S, E
TC
.)50
,000
50,0
00
UT
ILIT
IES
- E
LE
CT
RIC
ITY
TO
TA
L-
-
52
5,00
0
-
-
-
-
-
-
-
-
-
-
-
52
5,00
0
1060
.545
15U
TIL
ITIE
S -
WA
TE
R
G
EN
ER
AL
(FH
Q, S
AN
TIA
GO
BA
SIN
, BU
RR
IS P
S, E
TC
.)28
,000
28,0
00
K
RA
EM
ER
BA
SIN
IRR
IGA
TIO
N3,
000
3,
000
U
TIL
ITIE
S -
WA
TE
R T
OT
AL
-
-
31,0
00
-
-
-
-
-
-
-
-
-
-
-
31
,000
1060
.511
02M
EM
BE
RS
HIP
S
ST
AT
E O
F C
ALI
F. P
ES
TIC
IDE
LIC
EN
SE
(O
CT
AV
IO)
120
120
CW
EA
ME
MB
ER
SH
IP F
OR
CE
RT
IFIC
AT
ION
(C
HR
IS A
ND
DA
NN
Y)
600
600
AN
NU
AL
BA
CK
FLO
W C
ER
TIF
ICA
TIO
N A
ND
ME
MB
ER
SH
IP (
CH
RIS
F)
420
420
PR
OF
ES
SIO
NA
L G
EO
LOG
IST
INS
TIT
UE
ME
MB
ER
SH
IP80
80
WA
TE
R D
IST
RIB
UIT
ON
CE
RT
(JO
HN
B)
270
270
G
EO
LOG
IST
LIC
EN
SE
(JO
HN
B)
190
190
ME
MB
ER
SH
IPS
TO
TA
L1,
680
-
-
-
-
-
-
-
-
-
-
-
-
-
1,
680
1060
.511
92E
DU
CA
TIO
NA
L T
RA
ININ
G
B
AC
KF
LOW
TR
AIN
ING
(C
HR
IS F
)40
0
40
0
D
IST
RIB
UT
ION
LIS
CE
NC
E E
XA
M A
ND
PR
EP
500
500
PE
ST
ICID
E A
PP
LIC
AT
OR
S P
RO
F. A
SS
OC
IAT
ION
WO
RK
SH
OP
S30
0
30
0
PR
YO
R M
EM
BE
RS
HIP
(D
ON
, RA
Y, O
CT
AV
IO, M
AT
T B
., JU
LIO
)2,
000
2,
000
TR
AIN
ING
FO
R M
ISC
SO
FT
WA
RE
AN
D P
ER
MIT
S65
0
65
0
M
AIN
TE
NA
NC
E G
RA
DE
II (
CH
RIS
F, D
AN
NY
)40
0
40
0
WO
ND
ER
WA
RE
TR
AIN
ING
4,
000
4,
000
ED
UC
AT
ION
AL
TR
AIN
ING
TO
TA
L8,
250
-
-
-
-
-
-
-
-
-
-
-
-
-
8,
250
1060
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
T
RA
NS
PO
RT
AT
ION
FE
ES
600
600
SO
UT
H C
OA
ST
AQ
MD
PE
RM
IT &
FE
ES
1,80
0
1,80
0
CIT
Y F
IRE
INS
PE
CT
ION
200
200
PE
RP
(T
R62
/TR
70)
1,00
0
1,00
0
CIT
Y O
F A
NA
HE
IM C
UP
A (
US
T)
2,90
0
2,90
0
S
TA
TE
CR
AN
E C
ER
TIF
ICA
TIO
N1,
000
1,
000
D
MV
RE
Q F
OR
CLA
SS
A H
OLD
ER
S50
0
50
0
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
-
-
8,00
0
-
-
-
-
-
-
-
-
-
-
-
8,00
0
RE
CH
AR
GE
OP
ER
AT
ION
S G
RA
ND
TO
TA
L50
0,52
0
46,4
31
2,
127,
838
23
5,04
1
138,
905
14
3,53
1
200,
799
19
0,84
9
149,
241
12
6,61
1
93,2
84
97
,739
97,7
39
97
,789
4,24
6,31
7
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-3
9FY
202
0-21
Bud
get R
epor
t
JDE
Acc
ount
N
umbe
rD
escr
iptio
nG
ener
alG
WR
SP
rado
O&
MF
HQ
O&
MH
abita
tR
esto
ratio
nT
otal
AC
TIV
ITY
CO
DE
9900
9922
9924
9920
8008
SA
LAR
IES
& B
EN
EF
ITS
1062
.501
04R
EG
ULA
R S
ALA
RIE
S26
,408
28
,900
11
5,60
0
19,2
67
19,2
67
209,
441
10
62.5
0106
OV
ER
TIM
E55
6
1,66
7
6,
669
1,11
2
1,
112
11,1
15
1062
.502
10P
AY
RO
LL T
AX
ES
391
443
1,
773
29
5
29
5
3,
198
10
62.5
0202
RE
TIR
EM
EN
T4,
490
5,
089
20,3
58
3,39
3
3,39
3
36,7
23
1062
.502
04H
EA
LTH
INS
UR
AN
CE
1,96
5
5,32
3
21
,290
3,
548
3,
548
35
,674
10
62.5
0206
WO
RK
ER
S' C
OM
PE
NS
AT
ION
418
951
3,
805
63
4
63
4
6,
443
S
AL
AR
IES
& B
EN
EF
ITS
TO
TA
L34
,227
42
,374
16
9,49
5
28
,249
28
,249
30
2,59
4
1062
.530
15T
EM
PO
RA
RY
LA
BO
R
T
EM
PO
RA
RY
LA
BO
R F
OR
PR
AD
O
10,0
00
10,0
00
TE
MP
OR
AR
Y L
AB
OR
TO
TA
L-
-
10
,000
-
-
10
,000
1062
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
O
FF
ICE
AN
D K
ITC
HE
N S
UP
PLI
ES
(F
ED
-EX
)2,
000
2,00
0
P
RIN
TE
R A
ND
CO
MP
UT
ER
EQ
UIP
ME
NT
1,
500
1,50
0
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L-
-
3,
500
-
-
3,50
0
1062
.515
20G
AS
& D
IES
EL
FU
EL
G
AS
OLI
NE
AN
D D
IES
EL
FU
EL
FO
R O
N-R
OA
D V
EH
ICLE
S
5,50
0
5,50
0
GA
S &
DIE
SE
L F
UE
L T
OT
AL
-
-
5,50
0
-
-
5,50
0
1062
.515
21F
UE
L -
OF
F R
OA
D
FU
EL
- O
FF
RO
AD
40,0
00
40,0
00
FU
EL
- O
FF
RO
AD
TO
TA
L-
-
40
,000
-
-
40
,000
1062
.515
30U
NIF
OR
MS
& S
AF
ET
Y
UN
IFO
RM
S A
ND
BO
TT
LED
WA
TE
R
3,50
0
3,50
0
UN
IFO
RM
S &
SA
FE
TY
TO
TA
L-
-
3,
500
-
-
3,
500
1062
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
R
EP
AIR
OF
SM
ALL
TO
OLS
, WQ
EQ
UIP
ME
NT
, FLO
W M
ET
ER
S,
SE
NS
OR
S, E
TC
.1,
500
1,50
0
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
-
-
1,50
0
-
-
1,
500
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WE
TLA
ND
OP
ER
AT
ION
S (
1062
)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
0FY
202
0-21
Bud
get R
epor
t
JDE
Acc
ount
N
umbe
rD
escr
iptio
nG
ener
alG
WR
SP
rado
O&
MF
HQ
O&
MH
abita
tR
esto
ratio
nT
otal
AC
TIV
ITY
CO
DE
9900
9922
9924
9920
8008
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WE
TLA
ND
OP
ER
AT
ION
S (
1062
)
1062
.570
10M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
VE
HIC
LES
TR
UC
K M
AIN
TE
NA
NC
E A
ND
RO
UT
INE
RE
PA
IRS
3,
500
3,
500
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
VE
HIC
LE
S T
OT
AL
-
-
3,50
0
-
-
3,
500
1062
.570
12M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T
MO
WE
R, T
RA
CT
OR
, AN
D O
TH
ER
HE
AV
Y E
QU
IPM
EN
T
MA
INT
EN
AN
CE
AN
D R
OU
TIN
E R
EP
AIR
S (
GR
EA
SE
, OIL
, AIR
F
ILT
ER
S, H
YD
RA
ULI
CS
, BE
LT )
20,0
00
20,0
00
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- H
EA
VY
EQ
UIP
ME
NT
TO
TA
L-
-
20
,000
-
-
20
,000
1062
.570
16M
AIN
T S
TR
UC
TU
RE
& IM
PR
OV
EM
EN
T -
GE
NE
RA
L
A/C
MA
INT
EN
AN
CE
, SU
PP
LIE
S &
RE
PA
IRS
5,00
0
5,00
0
RO
CK
FO
R R
OA
D &
LE
VE
E S
TA
BIL
IZA
TIO
N2,
250
2,
250
G
EO
-CLO
TH
& G
AB
ION
S1,
500
1,
500
ELE
CT
RIC
AL
RE
PA
IRS
1,00
0
1,00
0
M
ISC
ELL
AN
EO
US
, RA
DIO
AN
D E
ME
RG
EN
CY
RE
PA
IRS
5,00
0
5,00
0
MO
SQ
UIT
O A
ND
VE
CT
OR
CO
NT
RO
L80
,000
80
,000
S
EC
UR
ITY
MA
INT
EN
AN
CE
, FE
NC
ES
, GA
TE
S, C
AM
ER
AS
, RE
MO
TE
S
EN
SIN
G
1,50
0
1,
500
T
RA
ILE
R M
AIN
TE
NA
NC
E &
RE
PA
IRS
3,50
0
3,50
0
FE
NC
ING
MO
DIF
ICA
TIO
NS
50
0
50
0
JA
NIT
OR
IAL
AN
D S
UP
PLI
ES
SE
RV
ICE
8,00
0
8,00
0
MA
INT
ST
RU
CT
UR
E &
IMP
RO
VE
ME
NT
- G
EN
ER
AL
TO
TA
L-
-
10
8,25
0
-
-
10
8,25
0
1062
.515
45S
MA
LL T
OO
LS
M
ISC
ELL
AN
EO
US
HA
ND
TO
OLS
(D
RIL
LS, H
AM
ME
RS
, WR
EN
CH
ES
, S
OC
KE
TS
, AN
D S
AW
S)
500
50
0
S
MA
LL P
OW
ER
EQ
UIP
ME
NT
AN
D P
AR
TS
500
50
0
SM
AL
L T
OO
LS
TO
TA
L-
-
1,
000
-
-
1,00
0
1062
.515
50S
AF
ET
Y S
UP
PLI
ES
W
OR
K S
AF
ET
Y R
ELA
TE
D S
UP
PLI
ES
, FIR
ST
AID
KIT
S, G
OG
GLE
S,
SP
RA
Y S
UIT
S, G
LOV
ES
, AN
D F
IRE
EX
TIN
GU
ISH
ER
S50
0
500
S
AF
ET
Y S
UP
PL
IES
TO
TA
L-
-
50
0
-
-
50
0
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
1FY
202
0-21
Bud
get R
epor
t
JDE
Acc
ount
N
umbe
rD
escr
iptio
nG
ener
alG
WR
SP
rado
O&
MF
HQ
O&
MH
abita
tR
esto
ratio
nT
otal
AC
TIV
ITY
CO
DE
9900
9922
9924
9920
8008
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
WE
TLA
ND
OP
ER
AT
ION
S (
1062
)
1062
.540
35C
HE
MIC
ALS
HE
RB
ICID
ES
FO
R A
RU
ND
O C
ON
TR
OL
500
500
CH
EM
ICA
LS
TO
TA
L-
-
50
0
-
-
500
1062
.515
65E
QU
IPM
EN
T R
EN
TA
L -
GE
NE
RA
L
RE
NT
SM
ALL
CO
NS
TR
UC
TIO
N E
QU
IPM
EN
T
500
50
0
E
QU
IPM
EN
T R
EN
TA
L -
GE
NE
RA
L T
OT
AL
-
-
500
-
-
500
1062
.515
70E
QU
IPM
EN
T R
EN
TA
L -
HE
AV
Y E
QU
IPM
EN
T
VE
GE
TA
TIO
N C
ON
TR
OL
25,0
00
25,0
00
R
EN
T E
XC
AV
AT
OR
, AN
D O
TH
ER
EQ
UIP
ME
NT
(D
OZ
ER
S, W
AT
ER
T
RU
CK
S A
ND
MO
WE
RS
)25
,000
25
,000
E
QU
IPM
EN
T R
EN
TA
L -
HE
AV
Y E
QU
IPM
EN
T T
OT
AL
-
-
50,0
00
-
-
50,0
00
1062
.545
01U
TIL
ITIE
S -
ELE
CT
RIC
ITY
E
LEC
TR
ICA
L U
TIL
ITIE
S10
,000
10
,000
U
TIL
ITIE
S -
EL
EC
TR
ICIT
Y T
OT
AL
-
-
10,0
00
-
-
10,0
00
1062
.511
92T
EC
HN
ICA
L T
RA
ININ
GR
EF
ER
EN
CE
BO
OK
S25
0
25
0
T
EC
HN
ICA
L T
RA
ININ
G T
OT
AL
-
-
250
-
-
25
0
1062
.512
04M
ISC
ELL
AN
EO
US
EX
PE
NS
ES
M
ISC
ELL
AN
EO
US
EX
PE
NS
ES
500
50
0
MIS
CE
LL
AN
EO
US
EX
PE
NS
ES
TO
TA
L-
-
50
0
-
-
500
W
ET
LA
ND
OP
ER
AT
ION
S G
RA
ND
TO
TA
L34
,227
42
,374
42
8,49
5
28,2
49
28,2
49
561,
594
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
2FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
SA
LAR
IES
& B
EN
EF
ITS
1069
.501
04R
EG
ULA
R S
ALA
RIE
S61
,493
30,2
88
91
,780
1069
.502
10P
AY
RO
LL T
AX
ES
892
439
1,33
1
1069
.502
02R
ET
IRE
ME
NT
10,2
39
5,
043
15
,281
1069
.502
04H
EA
LTH
INS
UR
AN
CE
8,13
6
4,00
7
12,1
43
1069
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N36
9
18
2
55
1
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
81,1
28
39
,959
121,
087
1069
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S
RE
AL
ES
TA
TE
SE
RV
ICE
S (
AP
PR
AIS
AL,
SU
RV
EY
ING
, TIT
LE, E
TC
.)3,
000
3,
000
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
TO
TA
L3,
000
-
3,
000
1069
.515
01O
FF
ICE
EX
PE
NS
ES
- G
EN
ER
AL
O
FF
ICE
SU
PP
LIE
S IN
CLU
DIN
G S
MA
LL D
ES
K S
UP
PLI
ES
, RE
PR
OG
RA
PH
ICS
, FIL
E C
AB
INE
T
500
500
OF
FIC
ES
EX
PE
NS
ES
- G
EN
ER
AL
TO
TA
L50
0
-
50
0
1069
.515
20G
AS
& D
IES
EL
FU
EL
F
UE
L F
OR
DIS
TR
ICT
VE
HIC
LES
250
250
GA
S &
DIE
SE
L F
UE
L T
OT
AL
250
-
250
1069
.560
22T
AX
ES
& A
SS
ES
SM
EN
TS
O
RA
NG
E C
OU
NT
Y S
EW
ER
& M
WD
FE
ES
AN
D A
SS
ES
SM
EN
TS
35,1
50
35
,150
R
IVE
RS
IDE
PR
OP
ER
TY
TA
X &
AS
SE
SS
ME
NT
S23
,000
23,0
00
S
AN
BE
RN
AR
DIN
O P
RO
PE
RT
Y T
AX
& A
SS
ES
SM
EN
TS
500
500
TA
XE
S &
AS
SE
SS
ME
NT
S T
OT
AL
58,6
50
-
58
,650
1069
.570
16M
AIN
TE
NA
NC
E S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
TS
- G
EN
ER
AL
P
RO
PE
RT
Y F
EN
CE
S, G
AT
ES
, LO
CK
S, M
ISC
ELL
AN
EO
US
RE
PA
IRS
, DIS
PO
SA
L S
ER
VIC
ES
500
500
MA
INT
EN
AN
CE
ST
RU
CT
UR
E A
ND
IMP
RO
VE
ME
NT
S -
GE
NE
RA
L T
OT
AL
500
-
500
1069
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
U
NIT
ED
PA
RC
EL
SE
RV
ICE
20
0
20
0
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
200
-
200
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PR
OP
ER
TY
MA
NA
GE
ME
NT
(10
69)
JDE
A
ccou
nt
Num
ber
Tot
al
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
3FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
AC
TIV
ITY
CO
DE
9900
9922
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
PR
OP
ER
TY
MA
NA
GE
ME
NT
(10
69)
JDE
A
ccou
nt
Num
ber
Tot
al
1069
.512
06LI
CE
NS
ES
AN
D P
ER
MIT
S
ED
ISO
N P
IPE
LIN
E L
ICE
NS
E A
CC
OU
NT
209
7 O
LD S
EA
WA
TE
R L
INE
(R
ES
O 7
2-1-
5 / N
O R
EN
T IN
CR
EA
SE
)1,
165
1,
165
GA
P E
DIS
ON
PIP
ELI
NE
LIC
EN
SE
AC
CO
UN
T 9
.406
8 (F
OR
MA
LLY
#21
10)
(AD
AM
S, S
AR
, GA
RF
IELD
, HB
)22
,315
22,3
15
GA
P E
DIS
ON
PIP
ELI
NE
LIC
EN
SE
AC
CO
UN
T 9
.417
2 (F
OR
MA
LLY
#32
72)
(GA
RF
IELD
, WA
RD
)13
,458
13,4
58
LIC
EN
SE
WIT
H M
WD
FO
R S
AN
TIA
GO
CR
EE
K R
EC
HA
RG
E E
NH
AN
CE
ME
NT
PR
OJE
CT
(D
OC
UM
EN
T #
R.L
. 283
2)1,
374
1,
374
LEA
SE
AG
RE
EM
EN
T W
ITH
OC
FLO
OD
CO
NT
RO
L D
IST
RIC
T M
ID-B
AS
IN IN
JEC
TIO
N (
CP
I AD
JUS
TM
EN
T)
26,5
79
26
,579
ED
ISO
N P
IPE
LIN
E L
ICE
NS
E A
CC
OU
NT
9.4
176
(FO
RM
ALL
Y #
308
5) (
GA
RF
IELD
/ELL
IS)
INJE
CT
ION
WE
LLS
I-27
& I-
2815
,677
15,6
77
LEA
SE
AG
RE
EM
EN
T W
ITH
CA
LTR
AN
S F
OR
TH
E B
UR
RIS
BA
SIN
/ B
ALL
RO
AD
PR
OP
ER
TY
8,83
2
8,83
2
LIC
EN
SE
S A
ND
PE
RM
ITS
TO
TA
L89
,400
-
89,4
00
PR
OP
ER
TY
MA
NA
GE
ME
NT
GR
AN
D T
OT
AL
233,
628
39,9
59
27
3,58
7
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
4FY
202
0-21
Bud
get R
epor
t
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
EN
GIN
EE
RIN
G (
1070
)
Des
crip
tion
Gen
eral
Tal
bert
Bar
rier
O&
M
GW
RS
OM
GA
P O
&M
Fou
ntai
nV
alle
y
For
ebay
R
echa
rge
O&
MP
FA
SO
CT
AI-
405
AC
TIV
ITY
CO
DE
9900
9908
9922
9911
9901
9920
1,91
417
01
SA
LAR
IES
& B
EN
EF
ITS
1070
.501
04R
EG
ULA
R S
ALA
RIE
S93
1,46
8
40
,786
44
,032
29
,560
5,
912
26,3
49
20,4
37
15,7
08
1,11
4,25
1
1070
.501
06O
VE
RT
IME
SA
LAR
IES
500
500
CA
PIT
ALI
ZE
D S
ALA
RIE
S(4
65,9
56)
(465
,956
)
10
70.5
0210
PA
YR
OLL
TA
XE
S14
,723
59
1
638
42
9
86
38
2
296
22
8
17,3
73
1070
.502
02R
ET
IRE
ME
NT
151,
926
6,79
1
7,
331
4,92
2
98
4
4,38
7
3,
403
2,61
5
18
2,35
9
10
70.5
0204
HE
ALT
H IN
SU
RA
NC
E13
3,27
0
6,
740
6,74
7
5,
381
1,07
6
3,
733
2,65
7
2,
603
162,
208
1070
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N6,
693
29
8
321
21
6
43
19
2
149
11
5
8,02
7
CA
PIT
ALI
ZE
D B
EN
EF
ITS
(155
,373
)
(1
55,3
73)
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
617,
250
55
,206
59,0
70
40
,507
8,
101
35
,044
26,9
42
21
,269
863,
389
1070
.511
02M
EM
BE
RS
HI P
OR
GA
NIZ
AT
ION
AL
ME
MB
ER
SH
IPS
1,00
0
1,00
0
ME
MB
ER
SH
IP T
OT
AL
1,00
0
-
-
-
-
-
-
-
1,
000
10
70.5
1301
TR
AV
EL/
CO
NF
ER
EN
CE
/MIL
EA
GE
EN
GIN
EE
RS
' CO
NF
ER
EN
CE
/SE
MIN
AR
S (
10 T
OT
AL)
5,00
0
5,00
0
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L5,
000
-
-
-
-
-
-
-
5,00
0
1070
.511
92T
EC
HN
ICA
L T
RA
ININ
G
LOC
AL
CLA
SS
ES
AN
D T
RA
ININ
G (
4 C
LAS
SE
S)
2,00
0
2,00
0
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L2,
000
-
-
-
-
-
-
-
2,00
0
1070
.530
10P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
EN
GIN
EE
RIN
GC
ON
SU
LTIN
G S
ER
VIC
ES
20,0
00
20
,000
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- E
NG
INE
ER
ING
TO
TA
L20
,000
-
-
-
-
-
-
-
20,0
00
1070
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
AN
NU
AL
EN
GIN
EE
R'S
RE
PO
RT
PR
EP
AR
AT
ION
1,50
0
1,
500
O
UT
SID
E C
OP
YIN
G S
ER
VIC
ES
500
50
0
P
RIN
TE
R C
AR
TR
IDG
ES
1,50
0
1,
500
C
ON
ST
RU
CT
ION
MA
NU
ALS
200
20
0
D
ES
IGN
BO
OK
S50
0
500
FE
DE
RA
L E
XP
RE
SS
500
50
0
M
ISC
ELL
AN
EO
US
OF
FIC
E S
UP
PLI
ES
500
500
S
UP
PLE
ME
NT
S T
O M
AN
UA
LS A
ND
BO
OK
S20
0
20
0
OU
TS
IDE
SE
RV
ICE
S1,
000
1,00
0
PU
BLI
C W
OR
KS
INS
PE
CT
ION
MA
NU
ALS
1,00
0
1,
000
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L7,
400
-
-
-
-
-
-
-
7,40
0
JDE
Acc
ount
Num
ber
Tot
al
O
rang
e C
ount
y W
ater
Dis
tric
t11
-45
FY 2
020-
21 B
udge
t Rep
ort
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
EN
GIN
EE
RIN
G (
1070
)
Des
crip
tion
Gen
eral
Tal
bert
Bar
rier
O&
M
GW
RS
OM
GA
P O
&M
Fou
ntai
nV
alle
y
For
ebay
R
echa
rge
O&
MP
FA
SO
CT
AI-
405
AC
TIV
ITY
CO
DE
9900
9908
9922
9911
9901
9920
1,91
417
01
JDE
Acc
ount
Num
ber
Tot
al
1070
.511
04S
UB
SC
RIP
TIO
NS
SM
AR
TN
ET
VR
S F
OR
GP
S1,
800
1,80
0
IN
FO
WA
TE
R M
OD
EL
1,20
0
1,
200
AU
TO
CA
D 3
D1,
500
1,50
0
AW
WA
ST
AN
DA
RD
S50
0
500
EN
R M
AG
AZ
INE
100
10
0
SU
BS
CR
IPT
ION
S T
OT
AL
5,10
0
-
-
-
-
-
-
-
5,
100
10
70.5
152
0G
AS
& D
IES
EL
F
UE
L F
OR
VE
HIC
LE3,
500
3,50
0
G
AS
& D
IES
EL
TO
TA
L3,
500
-
-
-
-
-
-
-
3,50
0
1070
.515
31S
HIR
TS
- L
OG
OS
HIR
TS
- L
OG
O
700
70
0
SH
IRT
S -
LO
GO
TO
TA
L70
0
-
-
-
-
-
-
-
700
EN
GIN
EE
RIN
G G
RA
ND
TO
TA
L66
1,95
0
55
,206
59
,070
40
,507
8,
101
35,0
44
26,9
42
21,2
69
908,
089
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
6FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
So.
Bas
in
Litig
atio
n N
o. B
asin
Li
tigat
ion
MT
BE
Li
tigat
ion
Wel
l EW
-1
Tal
bert
B
arrie
rO
&M
Ala
mito
s B
arrie
r O
&M
N
orth
Bas
inN
CP
S
outh
Bas
in
NC
P
PF
AS
S
outh
Bas
in
GW
P
rote
ctio
n
AC
TIV
ITY
CO
DE
9900
9922
9976
9977
9975
1711
9908
9932
9985
9986
1914
9941
SA
LAR
IES
& B
EN
EF
ITS
1075
.501
04R
EG
ULA
R S
ALA
RIE
S1,
244,
589
11,8
92
28
,291
36,7
09
14,3
44
35,7
34
13
3,22
1
166,
233
26
,927
37,8
19
1,
735,
760
1075
.501
06O
VE
RT
IME
18,7
49
466
1,
544
466
46
6
21,6
91
CA
PIT
ALI
ZE
D S
ALA
RIE
S(7
6,75
0)
(76,
750)
1075
.502
10P
AY
RO
LL T
AX
ES
22,4
29
179
41
0
55
5
208
51
8
1,
932
2,41
7
39
0
555
29
,594
1075
.502
02R
ET
IRE
ME
NT
199,
307
2,
058
4,71
0
6,36
9
2,
388
5,95
0
22,1
81
27
,755
4,48
3
6,
374
281,
577
1075
.502
04H
EA
LTH
INS
UR
AN
CE
181,
656
1,
372
2,80
0
4,68
7
1,
394
4,90
2
12,6
42
15
,204
2,85
2
3,
659
231,
170
1075
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N11
,951
83
372
647
10
5
440
3,24
4
4,
045
170
83
4
21,8
91
CA
PIT
ALI
ZE
D B
EN
EF
ITS
(27,
810)
(2
7,81
0)
SA
LA
RIE
S &
BE
NE
FIT
S T
OT
AL
1,57
4,12
0
16
,051
36,5
83
-
-
50
,512
18
,440
47
,545
173,
219
21
6,12
0
34,8
24
49
,708
2,21
7,12
2
1075
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
RE
GU
LAT
OR
Y &
AG
EN
CY
ME
ET
ING
S F
OR
WQ
PR
OJE
CT
S,
SE
AW
AT
ER
BA
RR
IER
S; T
EC
HN
ICA
L C
ON
FE
RE
NC
E A
TT
EN
DA
NC
E
(MO
DE
LIN
G, D
AT
A/G
IS)
(CA
LIF
OR
NIA
)2,
500
500
50
0
3,50
0
TR
AV
EL
/CO
NF
ER
EN
CE
/MIL
EA
GE
TO
TA
L2,
500
-
-
-
-
-
-
-
500
50
0
-
-
3,50
0
1075
.530
05P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
LE
GA
L
CO
NN
OR
FLE
TC
HE
R &
HE
DE
NK
AM
P20
0,00
0
50,0
00
25
0,00
0
MIL
LER
& A
XLI
NE
300,
000
10
0,00
0
100,
000
50
0,00
0
LAR
SO
N O
'BR
IEN
- IN
CLU
DE
S S
. SO
MM
ER
& K
. TA
KA
TA
80,0
00
70
,000
150,
000
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- L
EG
AL
TO
TA
L-
-
50
0,00
0
150,
000
10
0,00
0
-
-
-
80,0
00
70
,000
-
-
900,
000
1075
.530
10P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
EN
GIN
EE
R
HA
RG
IS +
AS
SO
CIA
TE
S (
SO
UT
H B
AS
IN R
I/FS
SE
RV
ICE
S)
360,
000
36
0,00
0
AE
CO
M (
NO
RT
H B
AS
IN R
I/FS
SE
RV
ICE
S)
80,0
00
80
,000
INT
ER
A (
NO
RT
H B
AS
IN M
OD
ELI
NG
)15
,000
15,0
00
TR
AF
FIC
CO
NT
RO
L, W
AS
TE
HA
ULI
NG
FO
R W
ELL
SA
MP
LIN
G3,
000
27,0
00
30
,000
SU
NS
ET
GA
P S
EA
WA
TE
R IN
TR
US
ION
MO
DE
LIN
G20
,000
20,0
00
LA-O
RA
NG
E C
OU
NT
Y U
ND
ER
FLO
W M
OD
EL
EV
ALU
AT
ION
75,0
00
75,0
00
WR
MS
UP
GR
AD
ES
PR
E-D
ES
IGN
20,0
00
20,0
00
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- E
NG
INE
ER
TO
TA
L95
,000
-
-
-
-
-
-
-
11
8,00
0
387,
000
-
-
60
0,00
0
1075
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
F
ED
ER
AL
EX
PR
ES
S/C
OU
RIE
R1,
000
1,00
0
O
FF
ICE
SU
PP
LIE
S IN
CLU
DIN
G S
MA
LL D
ES
K S
UP
PLI
ES
, SC
AN
NIN
G
SE
RV
ICE
S6,
500
6,50
0
P
LOT
TE
R P
AP
ER
& IN
K C
AR
TR
IDG
ES
4,00
0
4,
000
S
UP
PLI
ES
FR
OM
WA
RE
HO
US
E, P
ET
TY
CA
SH
1,50
0
1,
500
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L13
,000
-
-
-
-
-
-
-
-
-
-
-
13
,000
JDE
A
ccou
nt
Num
ber
Tot
al
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
HY
DR
OG
EO
LOG
Y (
1075
)
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
7FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
So.
Bas
in
Litig
atio
n N
o. B
asin
Li
tigat
ion
MT
BE
Li
tigat
ion
Wel
l EW
-1
Tal
bert
B
arrie
rO
&M
Ala
mito
s B
arrie
r O
&M
N
orth
Bas
inN
CP
S
outh
Bas
in
NC
P
PF
AS
S
outh
Bas
in
GW
P
rote
ctio
n
AC
TIV
ITY
CO
DE
9900
9922
9976
9977
9975
1711
9908
9932
9985
9986
1914
9941
JDE
A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
HY
DR
OG
EO
LOG
Y (
1075
)
Tot
al
1075
.515
20G
AS
& D
IES
EL
FU
EL
F
UE
L F
OR
DIS
TR
ICT
FIE
LD V
EH
ICLE
S (
WE
LL M
ON
ITO
RIN
G &
M
AIN
TE
NA
NC
E)
6,50
0
6,
500
GA
S &
DIE
SE
L F
UE
L T
OT
AL
6,50
0
-
-
-
-
-
-
-
-
-
-
-
6,
500
1075
.515
30U
NIF
OR
MS
& S
AF
ET
Y
B
OO
TS
, RA
ING
EA
R, U
NIF
OR
MS
FO
R F
IELD
PE
RS
ON
NE
L20
0
200
UN
IFO
RM
S &
SA
FE
TY
TO
TA
L20
0
-
-
-
-
-
-
-
-
-
-
-
200
1075
.515
31S
HIR
TS
- L
OG
O
S
HIR
TS
- L
OG
O10
0
100
SH
IRT
S -
LO
GO
TO
TA
L10
0
-
-
-
-
-
-
-
-
-
-
-
100
1075
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
F
IELD
EQ
UIP
ME
NT
RE
PA
IR (
VID
EO
TR
AIL
ER
, GE
NE
RA
TO
RS
, P
UM
PS
, WE
LDE
R)
3,00
0
3,
000
2 P
RIN
TE
RS
AN
D P
LOT
TE
R M
AIN
TE
NA
NC
E1,
000
1,00
0
W
AT
ER
LE
VE
L S
EN
SO
R R
EP
AIR
& C
ALI
BR
AT
ION
3,00
0
3,
000
W
ES
TB
AY
EQ
UIP
. (R
EE
LS, S
AM
PLE
R, P
RO
BE
S)
SE
RV
ICE
A
GR
EE
ME
NT
13,0
00
13,0
00
MA
INT
EN
AN
CE
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L20
,000
-
-
-
-
-
-
-
-
-
-
-
20
,000
1075
.570
16M
AIN
T S
TR
UC
TU
RE
S A
ND
IMP
RO
VE
ME
NT
SB
AS
IN-W
IDE
MO
NIT
OR
ING
WE
LL R
EP
AIR
S10
,000
10
,000
TO
OLS
FO
R W
ELL
AN
D E
QU
IPM
EN
T M
AIN
TE
NA
NC
E2,
000
2,00
0
MA
INT
ST
RU
CT
UR
ES
AN
D IM
PR
OV
EM
EN
TS
TO
TA
L12
,000
-
-
-
-
-
-
-
-
-
-
-
12
,000
1075
.515
45S
MA
LL T
OO
LSD
AT
ALO
GG
ER
S, V
EH
ICLE
EQ
UIP
ME
NT
, WA
TE
R L
EV
EL
PR
OB
ES
, C
AB
LES
, EC
& P
H M
ET
ER
S6,
000
6,00
0
T
OO
LS F
OR
WE
LL A
ND
EQ
UIP
ME
NT
MA
INT
EN
AN
CE
2,00
0
2,
000
SM
AL
L T
OO
LS
TO
TA
L8,
000
-
-
-
-
-
-
-
-
-
-
-
8,00
0
1075
.515
55LA
B S
UP
PLI
ES
C
ALI
BR
AT
ION
ST
AN
DA
RD
S F
OR
FIE
LD E
QU
IPM
EN
T10
0
100
LA
B S
UP
PL
IES
TO
TA
L10
0
-
-
-
-
-
-
-
-
-
-
-
100
1075
.511
02M
EM
BE
RS
HIP
D
IST
RIC
T M
EM
BE
RS
HIP
S F
OR
GR
A, N
GW
A, U
RIS
A A
ND
P
RO
FE
SS
ION
AL
CE
RT
IFIC
AT
ION
S1,
500
1,50
0
ME
MB
ER
SH
IP T
OT
AL
1,50
0
-
-
-
-
-
-
-
-
-
-
-
1,
500
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
8FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
G
WR
S
So.
Bas
in
Litig
atio
n N
o. B
asin
Li
tigat
ion
MT
BE
Li
tigat
ion
Wel
l EW
-1
Tal
bert
B
arrie
rO
&M
Ala
mito
s B
arrie
r O
&M
N
orth
Bas
inN
CP
S
outh
Bas
in
NC
P
PF
AS
S
outh
Bas
in
GW
P
rote
ctio
n
AC
TIV
ITY
CO
DE
9900
9922
9976
9977
9975
1711
9908
9932
9985
9986
1914
9941
JDE
A
ccou
nt
Num
ber
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
HY
DR
OG
EO
LOG
Y (
1075
)
Tot
al
1075
.511
92T
EC
HN
ICA
L T
RA
ININ
G
W
EB
INA
RS
, GIS
/WR
MS
PR
OG
RA
MM
ING
TR
AIN
ING
(A
RC
/GIS
, O
RA
CLE
, NE
T),
DR
ILLI
NG
INS
PE
CT
ION
TR
AIN
ING
2,50
0
2,
500
TE
CH
NIC
AL
TR
AIN
ING
TO
TA
L2,
500
-
-
-
-
-
-
-
-
-
-
-
2,50
0
1075
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
W
ELL
SIT
E &
DIS
CH
AR
GE
LIC
EN
SE
/PE
RM
IT R
EN
EW
ALS
20,0
00
20,0
00
US
EP
A, R
WQ
CB
& D
TS
C R
EV
IEW
OF
NO
RT
H B
AS
IN R
I/FS
D
OC
UM
EN
TS
CO
ST
RE
IMB
UR
SE
ME
NT
150,
000
15
0,00
0
RW
QC
B &
DT
SC
RE
VIE
W O
F S
OU
TH
BA
SIN
RI/F
S D
OC
UM
EN
TS
C
OS
T R
EIM
BU
RS
EM
EN
T80
,000
80,0
00
SA
NT
A A
NA
RIV
ER
WA
TE
RM
AS
TE
R E
XP
EN
SE
S23
,000
23
,000
U
SG
S S
TR
EA
MG
AG
ING
(W
AT
ER
MA
ST
ER
/PR
AD
O G
AU
GE
AN
D
SA
NT
IAG
O C
RE
EK
GA
UG
E)
58,0
00
58,0
00
PU
RC
HA
SE
UP
DA
TE
D A
ER
IAL
PH
OT
OG
RA
PH
IMA
GE
RY
(20
20)
FO
R
GE
OG
RA
PH
IC IN
FO
RM
AT
ION
SY
ST
EM
50,0
00
50,0
00
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
151,
000
-
-
-
-
-
-
-
15
0,00
0
80,0
00
-
-
38
1,00
0
HY
DR
OG
EO
LO
GY
GR
AN
D T
OT
AL
1,88
6,52
0
16
,051
536,
583
15
0,00
0
100,
000
50
,512
18
,440
47
,545
521,
719
75
3,62
0
34,8
24
49
,708
4,16
5,52
2
Ora
nge
Cou
nty
Wat
er D
istr
ict
11-4
9FY
202
0-21
Bud
get R
epor
t
Des
crip
tion
Gen
eral
W
ildlif
e M
anag
emen
t H
abita
t R
esto
ratio
n
AC
TIV
ITY
CO
DE
9900
8010
8008
SA
LAR
IES
AN
D B
EN
EF
ITS
1080
.501
04R
EG
ULA
R S
ALA
RIE
S16
4,50
6
23
0,19
5
18
8,55
4
583,
255
1080
.502
10P
AY
RO
LL T
AX
ES
2,62
7
4,42
6
3,82
2
10
,875
1080
.502
02R
ET
IRE
ME
NT
26,7
41
35
,405
28,4
72
90
,619
1080
.502
04H
EA
LTH
INS
UR
AN
CE
21,3
89
42
,764
29,4
40
93
,593
1080
.502
06W
OR
KE
RS
' CO
MP
EN
SA
TIO
N3,
108
5,
863
4,
543
13,5
13
SA
LA
RIE
S A
ND
BE
NE
FIT
S T
OT
AL
218,
371
31
8,65
3
254,
832
791,
856
1080
.513
01T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E
WE
ST
ER
N W
ILD
LIF
E S
OC
IET
Y (
CA
)1,
500
1,50
0
CA
L-IP
C (
CA
)1,
500
1,
500
T
RA
VE
L/C
ON
FE
RE
NC
E/M
ILE
AG
E T
OT
AL
3,00
0
-
-
3,
000
1080
.530
01P
RO
FE
SS
ION
AL
SE
RV
ICE
S -
GE
NE
RA
LV
IRE
O M
ON
ITO
RIN
G -
JIM
PIK
E C
ON
TR
AC
T67
,000
67,0
00
BIO
LOG
IST
CO
NT
RA
CT
OR
SA
WA
SP
LIT
50,0
00
50,0
00
BIR
D U
SE
OF
OC
WD
LA
ND
S C
A G
NA
TC
AT
CH
ER
(S
AW
A)
50,0
00
50
,000
FIS
H/B
IRD
DIE
T S
TU
DIE
S A
ND
PR
AD
O S
TA
TIS
TIC
S (
CS
ULB
)50
,000
50,0
00
PR
AD
O R
AP
TO
R S
TU
DY
20,0
00
20
,000
SA
WA
- M
ON
ITO
R A
ND
MA
NA
GE
SU
NN
YS
LOP
E C
RE
EK
35,0
00
35
,000
MO
NIT
OR
AN
D R
EP
OR
T L
EA
ST
TE
RN
S (
SA
WA
)
20,0
00
20
,000
C
AN
DID
AT
E E
ND
AN
GE
RE
D S
PE
CIE
S S
TU
DIE
S20
,000
20,0
00
PR
OF
ES
SIO
NA
L S
ER
VIC
ES
- G
EN
ER
AL
TO
TA
L-
31
2,00
0
-
31
2,00
0
10
80.5
3001
.170
EX
PE
NS
E -
CO
NT
RA
SA
WA
RE
IMB
UR
SE
ME
NT
- V
IRE
O M
ON
ITO
RIN
G(6
7,00
0)
(67,
000)
S
AW
A R
EIM
BU
RS
EM
EN
T -
PA
YR
OLL
(50,
000)
(5
0,00
0)
E
XP
EN
SE
- C
ON
TR
A T
OT
AL
-
(117
,000
)
-
(117
,000
)
1080
.530
15T
EM
P L
AB
OR
TE
MP
OR
AR
Y F
IELD
LA
BO
RE
RS
75,0
00
75
,000
T
EM
P L
AB
OR
TO
TA
L75
,000
-
-
75
,000
1080
.511
04S
UB
SC
RIP
TIO
NS
S
UB
SC
RIP
TIO
NS
/PU
BLI
CA
TIO
NS
750
750
S
UB
SC
RIP
TIO
NS
TO
TA
L75
0
-
-
750
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
NA
TU
RA
L R
ES
OU
RC
ES
(10
80)
JDE
Acc
ount
N
umbe
rT
otal
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
11-5
0
Des
crip
tion
Gen
eral
W
ildlif
e M
anag
emen
t H
abita
t R
esto
ratio
n
AC
TIV
ITY
CO
DE
9900
8010
8008
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
NA
TU
RA
L R
ES
OU
RC
ES
(10
80)
JDE
Acc
ount
N
umbe
rT
otal
1080
.515
01O
FF
ICE
EX
PE
NS
E -
GE
NE
RA
L
MIS
CE
LLA
NE
OU
S O
FF
ICE
SU
PP
LIE
S5,
000
5,
000
OF
FIC
E E
XP
EN
SE
- G
EN
ER
AL
TO
TA
L5,
000
-
-
5,00
0
1080
.515
20G
AS
& D
IES
EL
FU
EL
G
AS
, DIE
SE
L F
UE
L11
,000
11,0
00
GA
S &
DIE
SE
L F
UE
L T
OT
AL
11,0
00
-
-
11,0
00
1080
.515
31S
HIR
TS
- L
OG
O
S
HIR
TS
- L
OG
O50
0
50
0
SH
IRT
S -
LO
GO
TO
TA
L50
0
-
-
500
1080
.515
30U
NIF
OR
MS
CLO
TH
ING
, UN
IFO
RM
S, A
ND
BO
OT
S50
0
50
0
UN
IFO
RM
S T
OT
AL
500
-
-
50
0
1080
.570
04M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L
F
IELD
EQ
UIP
ME
NT
- T
RA
PS
1,00
0
1,00
0
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
GE
NE
RA
L T
OT
AL
1,00
0
-
-
1,
000
1080
.570
10M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
VE
HIC
LES
S
MA
LL T
RU
CK
SC
HE
DU
LED
AN
D U
NS
CH
ED
ULE
D R
EP
AIR
S,
TIR
ES
, BE
LTS
, ET
C.
5,00
0
5,00
0
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
VE
HIC
LE
S T
OT
AL
5,00
0
-
-
5,
000
1080
.570
12M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T
EQ
UIP
ME
NT
MA
INT
EN
AN
CE
, SP
RA
YE
R, C
HIP
PE
R, S
KID
ST
ER
3,00
0
3,00
0
M
AIN
TE
NA
NC
E E
QU
IPM
EN
T -
HE
AV
Y E
QU
IPM
EN
T T
OT
AL
3,00
0
-
-
3,
000
1080
.570
16M
AIN
T S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
TS
- G
EN
ER
AL
P
RA
DO
HA
BIT
AT
RE
ST
OR
AT
ION
/WE
TLA
ND
IMP
RO
VE
ME
NT
S85
,000
85,0
00
AR
UN
DO
RE
MO
VA
L F
OR
SA
RC
CU
P1,
000,
000
1,00
0,00
0
SA
NT
A A
NA
SU
CK
ER
HA
BIT
AT
RE
ST
OR
AT
ION
35,0
00
35
,000
RG
P R
EC
HA
RG
E A
RE
A H
AB
ITA
T M
AIN
TE
NA
NC
E80
,000
80,0
00
OC
WD
PR
OJE
CT
AR
EA
HA
BIT
AT
RE
ST
OR
AT
ION
80,0
00
80
,000
M
AIN
T S
TR
UC
TU
RE
AN
D IM
PR
OV
EM
EN
TS
- G
EN
ER
AL
TO
TA
L1,
280,
000
-
-
1,
280,
000
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
11-5
1
Des
crip
tion
Gen
eral
W
ildlif
e M
anag
emen
t H
abita
t R
esto
ratio
n
AC
TIV
ITY
CO
DE
9900
8010
8008
GE
NE
RA
L F
UN
D O
PE
RA
TIN
G B
UD
GE
T F
Y 2
0-21
NA
TU
RA
L R
ES
OU
RC
ES
(10
80)
JDE
Acc
ount
N
umbe
rT
otal
1080
.515
45S
MA
LL T
OO
LS
W
ILD
LIF
E M
AN
AG
EM
EN
T E
QU
IPM
EN
T6,
500
6,
500
FIE
LD E
QU
IPM
EN
T (
GP
S, N
ET
S, B
INO
CU
LAR
S, B
IRD
BO
XE
S,
ET
C.)
6,50
0
6,50
0
S
MA
LL
TO
OL
S T
OT
AL
13,0
00
-
-
13,0
00
1080
.515
65R
EN
T E
QU
IPM
EN
T -
GE
NE
RA
L
E
QU
IPM
EN
T R
EN
TA
L1,
000
1,
000
RE
NT
EQ
UIP
ME
NT
- G
EN
ER
AL
TO
TA
L1,
000
-
-
1,00
0
1080
.515
50S
AF
ET
Y S
UP
PLI
ES
S
AF
ET
Y E
QU
IPM
EN
T S
UC
H A
S S
AF
ET
Y G
OG
GLE
S, G
LOV
ES
500
500
S
AF
ET
Y S
UP
PL
IES
TO
TA
L50
0
-
-
500
1080
.511
12S
PE
CIA
L D
EP
AR
TM
EN
T E
XP
EN
SE
O
TH
ER
EN
VIR
ON
ME
NT
ALL
Y R
ELA
TE
D F
EE
S2,
000
2,
000
SP
EC
IAL
DE
PA
RT
ME
NT
EX
PE
NS
E T
OT
AL
2,00
0
-
-
2,
000
1080
.540
35C
HE
MIC
AL
HE
RB
ICID
E5,
000
5,
000
CH
EM
ICA
L T
OT
AL
5,00
0
-
-
5,
000
1080
.560
12IN
TE
R A
GE
NC
Y
S
AN
TA
AN
A S
UC
KE
R C
ON
SE
RV
AT
ION
(S
AW
PA
)15
,000
15,0
00
INT
ER
AG
EN
CY
TO
TA
L15
,000
-
-
15
,000
NA
TU
RA
L R
ES
OU
RC
ES
GR
AN
D T
OT
AL
1,63
9,62
1
51
3,65
3
254,
832
2,40
8,10
6
Ora
nge
Cou
nty
Wat
er D
istr
ict
FY 2
020-
21 B
udge
t Rep
ort
11-5
2
SECTION 11 ACRONYMS & ABBREVIATIONS
ACOE or Corps United States Army Corps of Engineers ACWA Association of California Water Agencies af Acre-feet AGWA Association of Ground Water Agencies AMX Water billing system AOP Advanced Oxidation Process AWPF Advanced Water Purification Facilities AWWARF American Water Works Association Research Foundation BCV Basin Cleaning Vehicle BEA Basin Equity Assessment BPP Basin Production Percentage CIP Capital Improvement Program CMMS Computerized Maintenance Management System CSDA California Special Districts Association DPH California Department of Public Health EDC Endocrine disrupting compounds EPA Environmental Protection Agency ERP Emergency Response Plan FHQ Field Headquarters FIS Financial Information System FRL Field Research Laboratory FTE Full time equivalent FY Fiscal year GL General liability insurance GAP Green Acres Project GWRS Groundwater Replenishment System GWRSIE Groundwater Replenishment System Initial Expansion I&E Instrumentation and electrical IEUA Inland Empire Utilities Agency IIS Integrated information systems IRWD Irvine Ranch Water District IS Information Services JDE JD Edwards JPIA Joint Powers Insurance Authority LC/MS/MS Liquid chromotograph/double mass spectrometer LIMS Lab Information System LTFP Long-Term Facilities Plan MGD Million gallons per day MSDS Material Safety Data Sheet MSL Mean Sea Level MWD Metropolitan Water District of Southern California MWDOC Municipal Water District of Orange County NDMA N-nitrosodimethylamine NPDES National Pollutant Discharge Elimination System NWRI National Water Research Institute O&M Operations and Maintenance OCCOG Orange County Council of Government OCEA Orange County Employee Association OCHCA Orange County Health Care Agency OCSD Orange County Sanitation District OMMP Operations, Maintenance and Monitoring Plan
SECTION 11 ACRONYMS & ABBREVIATIONS
PAC Project advisory committee PAYGO Pay as you go PBDE Poly-Brominated Diephenyl Ethers PCS Process Control System PDAs PFAS PFOA
Personal digital assistants Per-and polyfluoroalkyl substances Perfluorooctanoic acid
Producers Orange County groundwater producers QA/QC Quality assurance/quality control RA Replenishment assessment R&D Research and Development REWG Recharge Enhancement Working Group RFP Requests for proposals RMP Risk Management Plan RO Reverse osmosis R&R Replacement & Refurbishment RWQCB Regional Water Quality Control Board SAR Santa Ana River SARWQH Santa Ana River Water Quality Health SAWA Santa Ana Watershed Association SAWPA Santa Ana Watershed Project Authority SCADA Supervisory Control and Data Acquisition SRF State Revolving Fund TMDL Total maximum daily load TOC Total organic carbon UCMR2 Unregulated Contaminant Monitoring Rule Phases UCI University of California Irvine UV Ultraviolet light VOC Volatile organic compounds WEROC Water Emergency Response of Orange County WQ Water Quality W/C Workers’ compensation WRF WateReuse Research Foundation WRMS Water Resource Management System YLWD Yorba Linda Water District