Transcript of Oracle Customer Care and Billing Support Project Task Order ...
Transmittal 2
Oracle Customer Care and Billing Support
Project Task Order# A3-16-05
Exhibits for Contract Attachment
Clty of Los Angeles
LOS ANGELES SANITATION
inflection Point SOiutions, LLC
Los Angeles, CA
OCTOBER 2016
FINAL
City Contract
Contact:
Inflection Point
Solutions, LLC
Contact:
Bureau of
Sanitation:
Project Task Order for
Oracle Customer Care and Billing Support
Corey Williams, Inflection Point Solutions, LLC
Date
Date
i/~23 I Date
Document Description ........... . 1.0 Statement of Costs ..... . 2.0 Approach to Project...
2.1 Scope of Service 2.2 General Work Plan 2.3 Project Personnel .
3.0 Ratification ............... .
············· .. 3 ·················4
···············5 ··················5
······5 . .............. 8
························8
on ents
2
Document Description The purpose of this document is to clearly outline on-call contract exhibits required to establish a new
Project Task Order and proceed with project implementation, Any required exhibit not herein will be
used as established with the on-call contract.
Distribution List
City of Los Angeles
Anita Fernandez, Division Manager, ICSD, Los Angeles Sanitation
Inflection Point Solution, LLC
Corey Williams, Project Executive
Diedmar van der Ryst, Project Lead Jill Means, Task Order Administrator
3
1.0 Statement of Costs
Below you will find cost estimates for the project as outlined in the Project Approach.
To note:
• The hours provided for Died mar van der Ryst are calculated based on average weekly work efforts on the prior Oracle CC&B billing project(s). It is at the Bureau's discretion to determine the number of hours (increased or decreased) that Diedmar will be needed.
• While Corey Williams will serve as Project Executive, no hours will be invoiced for the proj ect role. Based on previous work experience with the Bureau on the prior Oracle CC&B billing project, we anticipate that there will not be a need for Project Executive involvement. As the IPS Executive in Charge however, Corey will be available to the Bureau should any critical issues arise.
• No overhead or administrative costs are included within Task 0: Mobilize Resources and Transition Support.
Individual No. of Hours
Corey Williams, Project Executive 0
Diedmar van der Ryst, CC&B 816
Functional Architect
Jill Means, Task Order Administrator 80
Total Labor 896
Task O: Mobilize Resources and Transition Support
Estimated Expenses
The actual cost is not to exceed $350,000
4
Billing Rate $/hour
$220
$247.50
$100
Total Cost
$0
$201,960
$8,000
$209,960
$140,000
$0
2.0 Approach to Project
2.1 Scope of Service Background
The City of Los Angeles Department of Water and Power (DWP) is the billing agent for the City's' Bureau
of Sanitation. DWP bills for Sanitation's Sewer Service Charge and other various fees associated with the
Solid Waste Program. In early September 2013, DWP went live with a new billing system to replace a
decades old mainframe based system. The new system is Oracle's Customer Care & Billing System
(CC&B). Since go live, DWP has been working on resolving the inevitable billing and related issues that
follow a large implementation such as this. LA Sanitation {LASAN) has brought in additional resources to
the DWP mitigation team to address the specific LASAN issues.
Continued support is needed by LASAN to resolve the remaining issues with the billing system to ensure
that LASAN can provide quality customer service and resolve customer issues in a timely manner.
Proposal
This Project Task Order Solicitation (PTO) is to provide one or more persons to work with the DWP issue
mitigation team to address Sanitation's issues. They will work at the DWP facility in downtown Los
Angeles under the direction of DWP's ITS or at the Public Works Building under the direction of LASAN's
Financial Management Division. The Bureau has acknowledged and agreed it is difficult to predict how
long it will take to resolve issues in this type of work so have requested a "level of effort" for this Task
Order.
IPS has agreed to 896 hours of support from a single person supplied through its subcontractor Ryst
Consulting. The assigned resource possesses CC&B experience particularly related to resolving post go
live billing and data issues as well as direct knowledge of the current DWP implementation.
2.2 General Work Plan
The following Project Approach identifies the high-level tasks that IPS will perform to resolve production
billing defects.
To note: IPS will adhere to or augment the project documentation templates and standards that have
already been established.
5
Task 0: Mobilize Resources and Transition Support
IPS's initial task will be to ensure project resources are trained and assembled, project processes and
communication protocols are defined, and development environments are setup and secure. This initial
task will ensure a successful transition of support.
The following Tasks 1, 2, and 3 will be performed by Died mar van der Ryst at the direction of LASAN and
within the number of hours as defined in the Statement of Costs. The information provided below
simply illustrates the typical approach utilized to perform these tasks.
Task 1: Resolve LASAN-related CC&B Billing Issues
!PS will utilize a comprehensive four (4) step approach to resolve LASAN related CC&B Billing issues. For
each noted issue, the following steps will be conducted:
Step 1: Define
With the assistance of the business SM E's, IPS will describe the defect in business language. The
Business SME will agree (sign~off, formally or informally, depending on project guidelines) that the
defect has been described adequately. Deliverables to include any or all of the following artifacts:
• Example bills highlighting discrepancies. • Priority of defect from a business standpoint. Priority should be substantiated by known or
estimated volume of defects, revenue impact, etc.
Step 2: Analyze
IPS will analyze the defect and determine if the defect is caused by a data issue, configuration
deficiency, or an imperfect business process. IPS will document all findings per established templates.
Alternative resolutions will be documented (where possible as there could only be a single solution) to
address the issue. Depending on the cause of the defect, the alternative(s) will be in the format of a
Functional design, Business Process design, or a Data Correction Routine Functional design. Deliverables
will include any or all of the following artifacts:
• Functional design. • Technical design. • Suggested test scenarios. • Time line to develop/test/deploy the solution. Take into consideration any other prioritized
defect solutions to ensure the solutions do not interfere with or invalidate each other.
Step 3: Test
In association with the Bureau, IPS will agree on a test environment to test the solution taking into
account other current development and/or defect testing activities. The test environment should have a
cut of data that represent the most current production view. Deliverables to include any or al! of the following artifacts:
• Test plan. • Count of records/accounts/premises that will be affected by solution. • Artifacts that prove the results of the solution (e.g. Example bills, pre/post screen shots).
6
• Verification activities {e.g. count of records/accounts/premises that were affected by solution).
IPS will replicate test(s) in as many test environments as deemed representative and adhere to
established project guidelines.
Step 4: Deploy
!PS wi!I plan the deployment of the solution with the defect release team, taking into consideration the
read and billing cycles of the accounts/premises in order to not affect or create any further defects. IPS
will re-use the test verification steps to prove the solution had the desired effect in production.
Task 2: Transfer Knowledge to LASAN
For each issue identified, IPS will ensure that the assigned LASAN professionals have a comprehensive
understanding of the defined issue and its subsequent solution. Mare formal training sessions may be
conducted on a periodic basis to transfer knowledge gained to LASAN professionals.
Task 3: Other related tasks as deemed necessary by LASAN
IPS personnel will perform other related tasks as deemed necessary by LASAN as they relate to the
Oracle Customer Care & Billing Support project and upon approval by the IPS Project Executive.
7
2.3 Project Personnel
The following table lists the personnel available for assignment to LASAN's project.
• Individual Function
1 Corey Will iams Project
Executive
CC&B Diedmarvan
2 Functional der Ryst
Architect
3 Jill Means Task Order
Administrator
3.0 Ratification
Assigned Tasks
Provide oversight of
the project to ensure
on-schedule, on-
budget outcomes.
Work with DWP Issue
M itigation Team to
address Bureau's
Oracle CC&B needs
Manage Task Order
execution (e.g.
Invoicing)
%of Time
All°'ated
5%
90%
5%
Working Address
12022 Blue Valley Parkway,
Suite 204, Overland Park, KS
66213
13206 Admiral Ave Unit A,
Marina Del Rey, CA 90292
12022 Blue Valley Parkway,
Suite 204, Overland Park, KS
66213
At the City's request Contractor has continued performance of the services specified herein prior to the
execution of this Agreement. To the extent that such services were performed in accordance with the
terms and conditions of the Agreement, the City hereby acknowledges the services previously
performed by Contractor and ratifies Contractor's performance of said services.
8