MTR Corporation Limited Kwun Tong Line Extension (KTE ...

19

Transcript of MTR Corporation Limited Kwun Tong Line Extension (KTE ...

siumc
Typewritten Text
siumc
Typewritten Text
siumc
Typewritten Text
( no. 034)

September 2015 Landscape and Visual Plan for Wylie Road Ancillary Building – Revision B

MTR Corporation Limited

Kwun Tong Line Extension (KTE)

Landscape and Visual Plan Part 3: Wylie Road Ancillary Building (September

2015) – Revision B

September 2015 Landscape and Visual Plan for Wylie Road Ancillary Building – Revision B

1. INTRODUCTION

This landscape and visual plan covers Wylie Road Ancillary Building (WAB) in compliance with Condition 4.9 of the Environmental Permit (EP No. EP-399/2010/D) of the Kwun Tong Line Extension (KTE), hereinafter referred to as “the Project”. The landscape and visual mitigation measures of the Project would be commenced by phases. The landscape and visual plans for other areas of the Project would be submitted by stages at least one month before commencement of the respective landscape and visual treatment works.

2. LANDSCAPE AND VISUAL PLAN FOR WYLIE ROAD ANCILLIARY BUILDING

2.1. Design Details The design of the WAB has been modified as compared with that presented in the approved KTE EIA Report to meet the operational needs. According to the updated design, the WAB will be a two storey building (highest point at 17 m above ground, 27.280 mPD) and the footprint will be approximately 339 m2 * (See Figure 6). The footprint and the height of the WAB are approximately same as that assumed in Table 3.3 of the approved KTE EIA report. The updated design and the mitigation measures to be implemented are intended to achieve the principle design imperative as per Section 5.12.3.1 of the approved KTE EIA report. The relevant recommended mitigation measures as proposed in Table 5.14 of the approved KTE EIA report are listed in Table 2.1 below. Table 2.1 Relevant Recommended Operational Phase Landscape and Visual Mitigation Measures (Extracted from Table 5.14 of the approved EIA Report)

ID no. Landscape / Visual Mitigation Measure Reference Document OM2 Compensatory Tree Planting

Suitable land pockets within the project area will be used for the implementation of compensatory mitigation to offset the net loss of key landscape resources and improve visual amenity. A compensatory tree planting proposal including locations of tree compensation will be submitted separately to seek relevant government department’s approval, in accordance with ETWB TCW No. 3/2006.

The compensatory tree planting has been provided. Details refer to drawing no.1001/C/WAB/JCL/A58/205 (rev.A5)

OM3 Horizontal and Slope Greening

September 2015 Landscape and Visual Plan for Wylie Road Ancillary Building – Revision B

Parapets at WAB and HOM shall be provided with internal permanent planter boxes. The roof at WAB shall be greened to improve visual amelioration from surrounding high level viewers.

Horizontal greening at WAB has been provided. Details refer to drawing no. 1001/C/WAB/JCL/A58/304, 1001/C/WAB/JCL/A58/206, Figure 1, Figure 2, Figure 3, Figure 4 and Figure 5.

OM4 Vertical Greening Vertical greening / climbers shall be applied to all above ground structures against exposed walls as far as possible subject to technical operational and maintenance constraints. Such planting shall be employed at WAB, HOM Station and WHA Station.

Vertical greening has been provided and details refer to Figure 2, Figure 3, Figure 4 and Figure 5 and drawing no. 1001/C/WAB/JCL/A14/001.

OM5 Architectural Design Aesthetics for the WAB at Club de Recreio The emergency access and ventilation building shall be designed in a way so as to ensure the form, material and surface detailing of this structure can fit sympathetically into the local context. The form shall consider the Cultural Heritage of the Club de Recreio site as well as other proximate buildings. The structure shall incorporate vertical greening / climbers where possible subject to technical operational and maintenance constraints. Detail Design Intent for the structures can be noted below.

The form and proportions of the WAB is designed to be complimentary to the Wylie Road streetscape. Proximate buildings (Hong Kong Chinese Civil Servants Club and the Philipino Club) are low to medium rise (2-4 storeys). The WAB will be a two storey building (highest point at 17 m above ground, 27.280 mPD) and the footprint (339 m2) is smaller than these adjacent buildings. The material and surface detailing of the WAB structure are designed to fit sympathetically into the local context. Details refer to Figure 2, Figure 3, Figure 4, Figure 5 and Figure 6.

The above mitigation measures for the WAB above would be implemented in accordance with the recommendations of the approved KTE EIA report and Variation of the Environmental Permit.

September 2015 Landscape and Visual Plan for Wylie Road Ancillary Building – Revision B

2.2. Locations Please refer to the attached drawings.

2.3. Implementation Programme The landscape treatment works has been carried out and completed in June 2016.

2.4. Maintenance and management schedules MTR Corporation would be responsible for the maintenance of the landscape mitigation measures after completion for the Wylie Road Ancillary Building. For the area within Club de Recreio, MTR Corporation would provide compensatory trees and reinstate the tennis courts and handover to Club de Recreio for future management and maintenance.

SITE LOCATION PLAN:

GENERAL LEGEND FOR

LANDSCAPE DETAIL PLAN:

GENERAL LEGEND FOR LANDSCAPE UTILITY PLAN:

GENERAL LEGEND FOR

YMT TO WHAMPOA TUNNELS AND HOM STATION

PCL

HPW

RGH

RGH

GENERAL LEGEND

1001/C/WAB/JCL/A58/102

TOP OF WALL LEVEL

RETAINED TREE NO.

RETAINED TREE &

EXISTING LEVEL+0.000(EX)

FALL

DRAINAGE

SOILING PLAN:

GENERAL LEGEND FOR

PLANTING SOIL MIX

1200 mm (DEPTH)

PLANTING SOIL MIX

700 mm (DEPTH)

CONTRACT 1001

1

407

1

408

WYILE ROAD ANCILLARY BUILDING

2

402

FFL.0.00

TW+0.00

TOP OF SOIL LEVELTSL+0.00

1

A58/401

2

A58/401

1

A58/402

6

A58/403

8

A58/403

7

A58/403

2

A58/404

1

A58/404

COVER U-CHANNELUC

FALL ON PLANTER

FALL

1:50

N.T.S.1001_C_WAB_JCL_A58_102A2.dgn A2

PLANTERP

MTR'S AREA

GT2

FW1

PLANTING

SHRUB /GROUND COVER

HEAVY STANDARD TREE

TO DWG

WATER POINT

IRRIGATION

P1

P2

PROPOSED LEVEL

TO DWG NO.

TYPE 3

PLANTER WALL

PW3

BOLLARD LIGHT

TO DWG NO.

PAVING TYPE '1'

TO DWG NO.

PAVING TYPE '2'

G1 TO DWG NO.

GATE 1

PLANTING SOIL MIX

300 mm (DEPTH)

PW1

TO DWG NO.

KERB TYPE 1

K1

TO DWG NO.

TYPE 1

PLANTER WALL

PW2

TO DWG NO.

TYPE 2

PLANTER WALL

FW3

G2TO DWG NO.

GATE TYPE 2

TO DWG NO.

TRIP RAIL R2

R2

FALL

1 : 100

LANDSCAPE WORKS

EXTENT OF

WITHIN PLANTER

PERFORATED DRAIN PIPE

PLANTING PLAN:

GENERAL LEGEND FOR

FENCE WALL TYPE 2

FENCE WALL TYPE 1

18/JAN/13

FIRST ISSUEA1 HPW 18JAN13 RGH

CLIMBER LEGEND ADDEDA2 TFL 16SEP15 RGH

CLIMBER

A2

10:11:27

AM

17-Se

p-15

leun

gpcl

PRIN

TE

D

BY:

X:\

3275

L

Driv

e\3275

KT

E 10

01 Detaile

d

Desig

n\

DR

AWIN

G\

K7b4\10

01_

C_

WA

B_J

CL_

A58_10

2A2.d

gn

FIL

EN

AM

E:

PL

OT

DR

V:

Default

MO

DE

LN

AM

E:

C:\

Mstn\

Plotdriv

er\_plotdrv\

PD

F_

Color_300dpi_

080923.plt

KWUN TONG LINE EXTENSION

DESCRIPTIONREV BY DATE APPROVEDDESCRIPTIONREV BY DATE APPROVED

DRAWING NO.SCALE

TITLE

REV.

DRAWN

DESIGNED

CHECKED

APPROVED

DATE

ORIGINATOR

CADD REF.DRAWING OR ANY PART THEREOF CAN BE MADE.

OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE

IS RETAINED BY NISHIMATSU WHOSE CONSENT MUST BE

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING

VERIFIED ON SITE.

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE

Maps repro

duced with p

ermissio

n of th

e Director of

Lands, c H

ong K

ong G

overn

ment

www.jacobs.com

852.2880.9788 Fax 852.2565.5561

15th Floor, Cornwall House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong, China

YMT TO WHAMPOA TUNNELS AND HOM STATION

1 : 200 (A1)

PCL

HPW

RGH

RGH

1001/C/WAB/JCL/A58/201

WYLIE ROAD ANCILLARY BUILDING

SITE LOCATION PLAN

METRES

1 : 100

0 1 2 3 4 5

CONTRACT 1001

A

F

E

D

1001_C_WAB_JCL_A58_201A3.dgn A3

A

E N

D

COORDINATE

E

F

PERMANENTLY REMOVED.

AND 4 FLOOD LIGHTS TO BE

AND USED FOR LOCATING WAB.

PERMANENTLY DEMOLISHED

1 EXISTING TENNIS COURT TO BE

CONSTRUCTION COMPLETION

ALL TO BE REINSTATED UPON

TO BE REMOVED FOR WAB WORKS AREA.

DEMOLISHED & 11 FLOODLIGHTS

3 EXSTING TENNIS COURTS TO BE

TENNIS COURT

HARD SURFACE TENNIS COURT

EXISTING

TENNIS COURT

18/JAN/13

FIRST ISSUEA1 HPW 18JAN13 RGH

GENERAL REVISIONA2 TFL 03DEC14 RGH

836208.547 818775.893

836234.440 818782.366

836243.297 818746.442

836217.453 818740.268

SITE BOUNDARY SETTING OUT REVISEDA3 TFL 26AUG15 RGH

A3

A3

A3

A3

A3

±M¬ì¶E

µá

«ß

Specialist

Clinic D

ispensa

ry

The Filip

ino

Clu

b

10

8

L

L

H

L

10.8

11.5

11.8

M.J.

FENCE LINE

F3

F2

F1

3:0

3:2

2 P

M26-

Aug-15

Le

un

gpcl

PRIN

TE

D

BY:

X:\

3275

L

Driv

e\3275

KT

E 10

01 Detaile

d

Desig

n\

DR

AWIN

G\

K7b4\10

01_

C_

WA

B_J

CL_

A58_201A

3.d

gn

FIL

EN

AM

E:

PL

OT

DR

V:

Default

MO

DE

LN

AM

E:

C:\

Mstn\

Plotdriv

er\_plotdrv\

PD

F_

Color_300dpi_

080923.plt

KWUN TONG LINE EXTENSION

DESCRIPTIONREV BY DATE APPROVEDDESCRIPTIONREV BY DATE APPROVED

DRAWING NO.SCALE

TITLE

REV.

DRAWN

DESIGNED

CHECKED

APPROVED

DATE

ORIGINATOR

CADD REF.DRAWING OR ANY PART THEREOF CAN BE MADE.

OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE

IS RETAINED BY NISHIMATSU WHOSE CONSENT MUST BE

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING

VERIFIED ON SITE.

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE

Maps repro

duced with p

ermissio

n of th

e Director of

Lands, c H

ong K

ong G

overn

ment

www.jacobs.com

852.2880.9788 Fax 852.2565.5561

15th Floor, Cornwall House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong, China

siumc
Polygon
siumc
Polygon
siumc
Polygon
siumc
Polygon
siumc
Callout
Area reinstated and to be handover to Club de Recreio (Area excluded from LVP submission under EIA)
siumc
Callout
Area to be maintained by MTRC and compensated trees to be maintained by MTRC one year after completion of landscape works

H

L

ºô²Tennis Courts

WIP Dec 2011

10.0

10.8

TREE T2

10:4

7:4

0

AM

17-Se

p-15

leun

gpcl

PRIN

TE

D

BY:

X:\

3275

L

Driv

e\3275

KT

E 10

01 Detaile

d

Desig

n\

DR

AWIN

G\

K7b4\10

01_

C_

WA

B_J

CL_

A58_206

A3.d

gn

FIL

EN

AM

E:

PL

OT

DR

V:

Default

MO

DE

LN

AM

E:

C:\

Mstn\

Plotdriv

er\_plotdrv\

PD

F_

Color_300dpi_

080923.plt

KWUN TONG LINE EXTENSION

DESCRIPTIONREV BY DATE APPROVEDDESCRIPTIONREV BY DATE APPROVED

DRAWING NO.SCALE

TITLE

REV.

DRAWN

DESIGNED

CHECKED

APPROVED

DATE

ORIGINATOR

CADD REF.DRAWING OR ANY PART THEREOF CAN BE MADE.

OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE

IS RETAINED BY NISHIMATSU WHOSE CONSENT MUST BE

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING

VERIFIED ON SITE.

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE

Maps repro

duced with p

ermissio

n of th

e Director of

Lands, c H

ong K

ong G

overn

ment

www.jacobs.com

852.2880.9788 Fax 852.2565.5561

15th Floor, Cornwall House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong, China

C

B

A

1

2

4

3

M.J.

FENCE LINE

F3

F2 F1

NOTES:

YMT TO WHAMPOA TUNNELS AND HOM STATION

1 : 100 (A1)

PCL

HPW

RGH

RGH

1001/C/WAB/JCL/A58/206

WYLIE ROAD ANCILLARY BUILDING

METRES

1 : 100

0 1 2 3 4 5

LEVEL G SHRUBS PLANTING PLAN

CONTRACT 1001

LEGENDS:

RETAINED AND PROTECTED

EXISITING TREE TO BE

³nªK

1001_C_WAB_JCL_A58_206A3.dgn

Type Botanical Name Chinese Name Standard Spacing Remarks Quantity

SHRUB

ALL.CAT. ALLAMANDA CATHARTICA 700 250 350H X 300W

ALP.SPE. ALPINIA SPECIOSA 450 300 400H X 300W

CAN.IND. CANNA INDICA 700 200 300H X 200W

COR.TER. CORDYLINE TERMIALIS 700 400 700H X 450W

SCH.ARB. SCHEFFLERA ARBORICOLA 700 400 600H X 450W

SCH.ARB.VAR. SCHEFFLERA ARBORICOLA VARIEGATA 700 400

GROUND COVER

ASP.SPR. ASPARAGUS SPRENGERI 700 100 150H X 100W

EPI.AUR. EPIPREMNUM AUREUM 200 100

IRE.HER. IRESINE HERBSTII 700 250

NEP.EXA.BOS. 700 100

OPH.JAP.VAR. OPHIOPOGON JAPONICUS 'VARIEGATA' 700 100

600H X 450W

150H X 100W

200H X 200W

300H X 150W

150H X 100W

NEPHROLEPIS EXALTATA 'BOSTONIENSIS'

A3

REFER TO DRAWING NO. 1001/C/WAB/JCL/A58/101

FOR GENERAL NOTE ,

REFER TO DRAWING NO. 1001/C/WAB/JCL/A58/102

FOR GENERAL LEGEND ,

EPI.AUR. 454 NOS.

CAN.IND. 111 NOS.

IRE.HER. 48 NOS.

OPH.JAP.VAR. 172 NOS.

IRE.HER. 40 NOS.

ASP.SPR. 113 NOS.

ALP.SPE 73 NOS.

COR.TER. 333 NOS.

SCH.ARB. 53 NOS.

ALL.CAT. 414 NOS.

SCH.ARB. 86 NOS.

ASP.SPR. 218 NOS.

NEP.EXA.BOS. 312 NOS.

CAN.IND. 301 NOS.

COR.TER. 68 NOS.

245

414

314

832

401

511

1377

312

951

37

18/JAN/13

FIRST ISSUEA1 HPW 18JAN13 RGH

GENERAL REVISIONA2 TFL 03DEC14 RGH

A3

SCH.ARB.VAR. 8 NOS.

CAN.IND. 119 NOS.

OPH.JAP.VAR. 213 NOS.

IRE.HER. 33 NOS.

IRE.HER. 82 NOS.

ALP.SPE. 195 NOS.

SCH.ARB.VAR. 29 NOS.

CAN.IND. 301 NOS.

EPI.AUR. 459 NOS.

EPI.AUR. 464 NOS.

ÆA¤

¬ü¤

ÅK

¤K¸

ªá¸­¤

¤Ñ

ºñ

¦å³

ªi´µ

ªá¸­ª

ºØ ¾Ç ¤¤¤å ³W®æ ºØ´ÓÁ µù ¼Æ

FENCE WALL REVISED & GENERAL REVISEDA3 TFL 16SEP15 RGH

OPH.JAP.VAR. 368 NOS.

OPH.JAP.VAR. 198 NOS.

IRE.HER. 42 NOS.

ALP.SPE. 46 NOS.

ASP.SPR. 180 NOS.

LON.JAP. 24 NOS.LON.JAP. 48 NOS.

CLIMBER 爬藤類

LON.JAP. 300 72

A3

A3

A3

139

LONICERA JAPONICUS §Ô 300

Type Botanical Name Chinese Name Standard Spacing Quantity

ºØ ¾Ç ¤¤¤å ³W®æ ºØ´ÓÁ ¼Æ Remarks

µù

150

Height

°ª

vigorous growth

min.5 shoots with

10:4

8:2

1 A

M17-Se

p-15

leun

gpcl

PRIN

TE

D

BY:

X:\

3275

L

Driv

e\3275

KT

E 10

01 Detaile

d

Desig

n\

DR

AWIN

G\

K7b4\10

01_

C_

WA

B_J

CL_

A58_304

A3.d

gn

FIL

EN

AM

E:

PL

OT

DR

V:

Mo

del

MO

DE

LN

AM

E:

C:\

Mstn\

Plotdriv

er\_plotdrv\

PD

F_

Color_300dpi_

080923.plt

KWUN TONG LINE EXTENSION

DESCRIPTIONREV BY DATE APPROVEDDESCRIPTIONREV BY DATE APPROVED

DRAWING NO.SCALE

TITLE

REV.

DRAWN

DESIGNED

CHECKED

APPROVED

DATE

ORIGINATOR

CADD REF.DRAWING OR ANY PART THEREOF CAN BE MADE.

OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE

IS RETAINED BY NISHIMATSU WHOSE CONSENT MUST BE

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING

VERIFIED ON SITE.

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE

Maps repro

duced with p

ermissio

n of th

e Director of

Lands, c H

ong K

ong G

overn

ment

www.jacobs.com

852.2880.9788 Fax 852.2565.5561

15th Floor, Cornwall House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong, China

PH

µá

«ß

The Filip

ino

Clu

b

10

8

6

ºô²

ºô²

­»´ä¬F©

°±̈

¯ó¦aº

Tennis Courts

Tennis Courts

Tennis Courts

AssoicationChinese Civil Servants'

Hong Kong

Car Pa

rk

Bowling Green

WYLIE P

ATH

½Ã²

10.8

9.7

8.9

H

L

L

L

L

L

C

B

A

1

2

3

4

KEY LOCATION PLAN

THE SITE

METRES

1 : 100

0 1 2 3 4 5

RGH

RGH

HPW

PCL

1 : 100 (A1)

CONTRACT 1001

YMT TO WHAMPOA TUNNELS AND HOM STATION

1001/C/WAB/JCL/A58/3041001_C_WAB_JCL_A58_304A3.dgn

WYLIE ROAD ANCILLARY BUILDING

A3

ROOF LANDSCAPE SHRUBS PLANTING

NOTES:

LEGENDS:

SHRUB

Type Botanical Name

ALLAMANDA CATHARTICA

種類 學名 規格 數量中文名稱 種植闊度 註

灌木類

軟枝黃蟬ALL.CAT.

Chinese Name Standard Spacing Remarks Quantity

700 250 POTTED 866

REFER TO DRAWING NO. 1001/C/WAB/JCL/A58/101

FOR GENERAL NOTE ,

REFER TO DRAWING NO. 1001/C/WAB/JCL/A58/102

FOR GENERAL LEGEND ,

ALL.CAT. 268 NOS.

ALL.CAT. 598 NOS.

18/JAN/13

FIRST ISSUEA1 HPW 18JAN13 RGH

GERENAL REVISONA2 TFL 11SEP14 RGH

+22.510

+22.510

+22.510 FINISH FLOOR LEVEL

ROOF PLANTING UPDATEDA3 TFL 16SEP15 RGH

LON.JAP. 16 NOS.

LON.JAP. 70 NOS.

A3

A3

A3

A3

CLIMBER 爬藤類

LON.JAP. 300LONICERA JAPONICUS §Ô 300

Type Botanical Name Chinese Name Standard Spacing Quantity

ºØ ¾Ç ¤¤¤å ³W®æ ºØ´ÓÁ ¼Æ Remarks

µù

150

Height

°ª

vigorous growth

min.5 shoots with

LON.JAP. 80 NOS.

166

+10.200

+10.900

FAIRFACED CONCRETE

A B C

+27.280

WIRE MESH CLADDING

VERTICAL GREENING

B

A13/002

U101

LO

PAINT

LIGHT GREY

FINISH &

RENDER LIGHT GREY PAINT

RENDER FINISH &

JOINT

MOVEMENT

+23.410

GRANITE WALL TILE

RECONSTITUTED

COPING

ALUMINIUM

02

A65/102

01

A65/102

03

A65/101

01

A65/101

05

A65/106

09

A65/109

+23.710

TOP OF PARAPET WALL

+23.760

TOP OF PARAPET WALL

02

A65/108

G10

LO

G08

LO

G11

LO

G09

LO

G13

LO 04

A55/102

ELEVATION B

LIGHT GREY PAINT

RENDER FINISH &

ROAD

WYLIE

+10.350

+23.210

+10.40 +10.35

+12.350

PLANTER WALL+11.40

GUARDRAIL

TOP OF

+15.7005

00

35

0SOP

SOP

SOP

+10.200

A

U101

LO

PAINT

LIGHT GREY

FINISH &

RENDER

JOINT

MOVEMENT

+23.410

+10.350

35

0

G

U1

+10.200

A

UPPER ROOF

U2(MAIN ROOF)

U101

LO

PAINT

LIGHT GREY

FINISH &

RENDER

JOINT

MOVEMENT

+23.410

+11.300 SFL

+11.400 FFL

+16.900 SFL

+17.000 FFL

+10.350

52

60

56

00

35

0

31

70

+25.330 SFL

+25.680 FFL

+22.160 SFL

+22.510 FFL

G

U1

5260

5600

ROOM

STAIR PRESS. FAN

S.S. LOUVERS FOR

C B A

CONCRETE

FAIRFACED +25.330 SFL

+25.680 FFL

+27.280

UPPER ROOF

B

A13/002

U102

LO

LIGHT GREY PAINT

RENDER FINISH &

ROOF)

U2(MAIN

JOINT

MOVEMENT

ALUMINIUM COPING

02

A57/011

+23.410

+17.120

02

A65/002

WALL TILES

GRANITE

RECONSTITUTED

350

01

A65/101

+23.760

TOP OF PARAPET WALL

+23.760

TOP OF PARAPET WALL

1100

02

A53/044+11.300 SFL

+11.400 FFL

+16.900 SFL

+17.000 FFL

ELEVATION D

VERTICAL GREENING

RAILING

ALUMINIUM COPING

GRANITE WALL TILE

RECONSTITUTED

COPING

ALUMINIUM

+9.70SOFT LANDSCAPING

+10.80

PLANTER+11.40

3170

+15.010

350

+16.10

SOP SOP

SOP

03

A57/022

02

A57/022

SOP

+22.160 SFL

+22.510 FFL

G

U1

5260

5600

ROOM

STAIR PRESS. FAN

S.S. LOUVERS FOR

C B A

CONCRETE

FAIRFACED +25.330 SFL

+25.680 FFL

+27.280

UPPER ROOF

B

A13/002

U102

LO

LIGHT GREY PAINT

RENDER FINISH &

ROOF)

U2(MAIN

JOINT

MOVEMENT

ALUMINIUM COPING

02

A57/011

+23.410

+17.120

02

A65/002

WALL TILES

GRANITE

RECONSTITUTED

350

01

A65/101

+23.760

TOP OF PARAPET WALL

+23.760

TOP OF PARAPET WALL

1100

02

A53/044+11.300 SFL

+11.400 FFL

+16.900 SFL

+17.000 FFL

ELEVATION D

VERTICAL GREENING

RAILING

ALUMINIUM COPING

GRANITE WALL TILE

RECONSTITUTED

COPING

ALUMINIUM

+9.70SOFT LANDSCAPING

+10.80

PLANTER+11.40

3170

+15.010

350

+16.10

SOP SOP

SOP

03

A57/022

02

A57/022

SOP

+22.160 SFL

+22.510 FFL

ELEVATION A

G

U1

+11.300 SFL

+11.400 FFL

5600

5260

FAIRFACED CONCRETE

LIGHT GREY PAINT

RENDER FINISH &

1 234

+27.280

CLADDING

WIRE MESH

GREENING

VERTICAL

GLAZED WALLUPPER ROOF

+25.330 SFL

+25.680 FFL

U2(MAIN ROOF)

A

A13/001

G01

LO

G02

LO

01

A53/031

04

A55/201

01

A65/101

ALUMINIUM COPING

MOVEMENT JOINT

5040

01

A55/102

02

A65/001

COPING

ALUMINIUM

GREY PAINT

LIGHT

FINISH &

RENDER

TILE

GRANITE WALL

RECONSTITUTED

350

02

A65/102

01

A65/102

04

A55/102

01

A55/202

01

A65/108

04

A57/011

03

A65/108

03

A65/108

04

A65/108

05

A65/108

+23.210

WALL TILE

RECONSTITUTED GRANITE

000

06

A57/011

000

SIM

+16.900 SFL

+17.000 FFL

+23.710

TOP OF PARAPET WALL+23.760

LIGHT GREY PAINT

RENDER FINISH &

+26.780

LIGHT GRAY PAINT

RENDER FINISH &

COLUMN

G07

LO

+10.800+10.800

+12.35

+10.200 FFL

+11.40PLANTER WALL

TOP OF GUARDRAIL

+11.40PLANTER WALL

REFER TO DRAWING

FOR DETAIL.

1001/C/WAB/JCL/A65/107

3170

+16.100

+15.700

500

+16.300

SOPSOP

SOP

+17.120

+22.160 SFL

+22.510 FFL

ELEVATION A

G

U1

+11.300 SFL

+11.400 FFL

5600

5260

FAIRFACED CONCRETE

LIGHT GREY PAINT

RENDER FINISH &

1 234

+27.280

CLADDING

WIRE MESH

GREENING

VERTICAL

GLAZED WALLUPPER ROOF

+25.330 SFL

+25.680 FFL

U2(MAIN ROOF)

A

A13/001

G01

LO

G02

LO

01

A53/031

04

A55/201

01

A65/101

ALUMINIUM COPING

MOVEMENT JOINT

5040

01

A55/102

02

A65/001

COPING

ALUMINIUM

GREY PAINT

LIGHT

FINISH &

RENDER

TILE

GRANITE WALL

RECONSTITUTED

350

02

A65/102

01

A65/102

04

A55/102

01

A55/202

01

A65/108

04

A57/011

03

A65/108

03

A65/108

04

A65/108

05

A65/108

+23.210

WALL TILE

RECONSTITUTED GRANITE

000

06

A57/011

000

SIM

+16.900 SFL

+17.000 FFL

+23.710

TOP OF PARAPET WALL+23.760

LIGHT GREY PAINT

RENDER FINISH &

+26.780

LIGHT GRAY PAINT

RENDER FINISH &

COLUMN

G07

LO

+10.800+10.800

+12.35

+10.200 FFL

+11.40PLANTER WALL

TOP OF GUARDRAIL

+11.40PLANTER WALL

REFER TO DRAWING

FOR DETAIL.

1001/C/WAB/JCL/A65/107

3170

+16.100

+15.700

500

+16.300

SOPSOP

SOP

+17.120

+22.160 SFL

+22.510 FFL

2:0

4:4

3 P

M21-

Se

p-15

leun

gpcl

PRIN

TE

D

BY:

X:\

3275

L

Driv

e\3275

KT

E 10

01 Detaile

d

Desig

n\

DR

AWIN

G\

K6a

&K6b\10

01_

C_

WA

B_J

CL_

A14

_001D

4.d

gn

FIL

EN

AM

E:

PL

OT

DR

V:

Default

MO

DE

LN

AM

E:

C:\

Mstn\

Plotdriv

er\_plotdrv\

PD

F_

Color_300dpi_

080923.plt

KWUN TONG LINE EXTENSION

DESCRIPTIONREV BY DATE APPROVEDDESCRIPTIONREV BY DATE APPROVED

DRAWING NO.SCALE

TITLE

REV.

DRAWN

DESIGNED

CHECKED

APPROVED

DATE

ORIGINATOR

CADD REF.DRAWING OR ANY PART THEREOF CAN BE MADE.

OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE

IS RETAINED BY NISHIMATSU WHOSE CONSENT MUST BE

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING

VERIFIED ON SITE.

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE

www.jacobschina.com.hk

852.2880.9788 Fax 852.2565.5561

15th Floor, Cornwall House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong, China

STAIR PRESS. FAN ROOM

S.S. LOUVERS FOR

1 2 3 4

+10.350

+23.760

TOP OF PARAPET WALL

A

A13/001

U102

LO

U101

LO

G03

LO

G04

LO

G05

LO

G06

LO

01

A65/103

+23.210

02

A65/002

350

05

A65/106

04

A55/102

ELEVATION C

LOUVERS

S.S.

FAIRFACED CONCRETE

PAINT

LIGHT GREY

FINISH &

RENDER

CONCRETE

FAIRFACED

LIGHT GREY PAINT

RENDER FINISH &

COPING

ALUMINIUM

JOINT

MOVEMENT

WALL TILE

RECONSTITUTED GRANITE

01

A65/106

+26.780

+9.610

+11.45+11.30

04

A55/102

GUARDRAIL

TOP OF GUARDRAIL

TOP OF

+15.010

+23.710

500

SOP

LIGHT GRAY PAINT

RENDER FINISH &

COLUMN

SOP

SOP

SOP

UPPER ROOF

+25.330 SFL

+25.680 FFL

+22.160 SFL

+22.510 FFL

ROOF)

U2(MAIN

+11.300 SFL

+11.400 FFL

G

+16.900 SFL

+17.000 FFL

U1

3170

5260

5600

STAIR PRESS. FAN ROOM

S.S. LOUVERS FOR

1 2 3 4

+10.350

+23.760

TOP OF PARAPET WALL

A

A13/001

U102

LO

U101

LO

G03

LO

G04

LO

G05

LO

G06

LO

01

A65/103

+23.210

02

A65/002

350

05

A65/106

04

A55/102

ELEVATION C

LOUVERS

S.S.

FAIRFACED CONCRETE

PAINT

LIGHT GREY

FINISH &

RENDER

CONCRETE

FAIRFACED

LIGHT GREY PAINT

RENDER FINISH &

COPING

ALUMINIUM

JOINT

MOVEMENT

WALL TILE

RECONSTITUTED GRANITE

01

A65/106

+26.780

+9.610

+11.45+11.30

04

A55/102

GUARDRAIL

TOP OF GUARDRAIL

TOP OF

+15.010

+23.710

500

SOP

LIGHT GRAY PAINT

RENDER FINISH &

COLUMN

SOP

SOP

SOP

UPPER ROOF

+25.330 SFL

+25.680 FFL

+22.160 SFL

+22.510 FFL

ROOF)

U2(MAIN

+11.300 SFL

+11.400 FFL

G

+16.900 SFL

+17.000 FFL

U1

3170

5260

5600

1 : 100 (A1)

TS WYLIE ROAD ANCILLARY BUILDING

YMT TO WHAMPOA TUNNELS AND HOM STATION

CONTRACT 1001

METRES

1 : 100

0 1 2 3 4 5

ELEVATIONS

LEGEND

1001/W/WAB/OAP/A10/001 & 002

01. REFER TO LEGENDS & SYMBOLS DRAWING

1001/C/WAB/JCL/A65/102

FOR DETAILS, REFER TO DRAWING

CLADDING - SS GRADE 316

PROPRIETARY STAINLESS STEEL METAL MESH

COLOR: RAL 7035 LIGHT GREY

UNLESS SPECIFIED OTHERWISE.

EXTERIOR RENDER, TOTAL THICKNESS TO BE 22mm

1001/C/WAB/JCL/A65/101

FOR DETAILS, REFER TO DRAWING

- GRADE 316. SUITABLE FOR CLIMBING PLANTS.

PROPRIETARY STAINLESS STEEL GREEN WALL MESH

NOTE

1001/W/000/OAP/A57/011

FOR DETAILS, REFER TO DRAWING

COLOUR: RAL 9001 CREAM WHITE

108mm X 50mm X 60mm

L SHAPE TILE 50mm X 60mm X 227mm, AND

SPECIAL SHAPES FOR OUTSIDE CONRNERS:

TILE SIZE: 227mm X 60mm FACE: SMOOTH

EXTERNAL RECONSTITUTED GRANITE WALL TILE

1001/W/000/OAP/A57/011

FOR DETAILS, REFER TO DRAWING

COLOUR: RAL 8023 ORANGE BROWN

108mm X 50mm X 60mm

L SHAPE TILE 50mm X 60mm X 227mm, AND

SPECIAL SHAPES FOR OUTSIDE CONRNERS:

TILE SIZE: 227mm X 60mm FACE: SMOOTH

EXTERNAL RECONSTITUTED GRANITE WALL TILE

ML

IVT

PC

WITH PVF2 POWDER COATED FINISH.

02. ALL LOUVRES SHALL BE RAL 7043 TRAFFIC GREY B

5/7/2010

1001/C/WAB/JCL/A14/001

A CL RGH30JAN12FIRST ISSUE

B CL RGH30MAR12RE-SUBMISSION

+23.760

TOP OF PARAPET WALL

C CL RGH04SEP12GENERAL REVISION

EF1

EF2

EF3

EF4

EF5

EF5

EF5

EF5

EF5

EF5

EF6

EF5

D4

D1 CL RGHGENERAL REVISION 29OCT12

1001_C_WAB_JCL_A14_001D3.dgn

ROAD

WYLIE

D2 CL RGHGENERAL REVISION 24APR14

D3 CL RGHGENERAL REVISION 16JUN14

04

A65/102

EF3

LIGHT GRAY PAINT

RENDER FINISH &

COLUMN

EF1

EF3

RGHD4 PCL 21SEP15

D4 D4

D4

D4

D4

CONCRETE FORMWORK TYPE F4 FAIR FACE FINISH

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

DRAWING 1001/C/WAB/JCL/A58/206 AND 304.

03. TYPE AND QUANTITY FOR CLIMBING PLANT REFER TO

EF5

EF6

EF1

EF1

EF4

EF6

EF1

EF6

EF3 EF3

EF2

EF4EF6

EF2

EF4

EF1

EF1

EF3

EF1

EF4

EF1

EF1

EF3

EF4 EF4

EF4

EF4

EF6

U2 LEVEL REVISED, MINOR REVISION, WALL FINISH REVISED

Crystal.Lee
Rectangle
Crystal.Lee
Typewritten Text
Figure 1
Crystal.Lee
Typewritten Text
Crystal.Lee
Rectangle
Crystal.Lee
Typewritten Text
Figure 2
Crystal.Lee
Rectangle
Crystal.Lee
Typewritten Text
Figure 3

OM4

EnvironmentalResourcesManagement

Annex E8

FILE: 0132172a14DATE: 05/02/2016

YMT to Whampoa Tunnels and HOM StationWylie Road Ancillary Building - Elevation C

(A1)

Remark:This drawing provides aestheticimpression of the indicative form, sizeand quality of the architectural andlandscaping treatment for the KTEstructures. The final details of layout,materials and finishes will be subjected todetailed development.

OM5 - The emergency access and ventilation building are designed ina way so as to ensure the form, material and surface detailing of thisstructure can fit sympathetically into the local context. The formconsiders the Cultural Heritage of the Club de Recreio site as well asother proximate buildings. The structure will incorporate verticalgreening / climbers where possible subject to technical operationaland maintenance constraints.

OM2OM2

Crystal.Lee
Rectangle
Crystal.Lee
Typewritten Text
Figure 4

OM2

(A1)

EnvironmentalResourcesManagement

Annex E9

FILE: 0132172a15bDATE: 05/02/2016

YMT to Whampoa Tunnels and HOM StationWylie Road Ancillary Building - Elevation D

Remark:This drawing provides aestheticimpression of the indicative form, sizeand quality of the architectural andlandscaping treatment for the KTEstructures. The final details of layout,materials and finishes will be subjected todetailed development.

OM5 - The emergency access and ventilation building are designed ina way so as to ensure the form, material and surface detailing of thisstructure can fit sympathetically into the local context. The formconsiders the Cultural Heritage of the Club de Recreio site as well asother proximate buildings. The structure will incorporate verticalgreening / climbers where possible subject to technical operationaland maintenance constraints.

OM2

Crystal.Lee
Rectangle
Crystal.Lee
Typewritten Text
Figure 5
Crystal.Lee
Typewritten Text

EnvironmentalResourcesManagement

Figure 6

FILE: 0132172a16DATE: 09/12/2015

YMT to Whampoa Tunnels and HOM StationWylie Road Ancillary Building - Level G Plan