METROPOLITAN PLANNING SUBCOMMITTEE 9:00 AM JANUARY ...
-
Upload
khangminh22 -
Category
Documents
-
view
4 -
download
0
Transcript of METROPOLITAN PLANNING SUBCOMMITTEE 9:00 AM JANUARY ...
METROPOLITAN PLANNING SUBCOMMITTEE AGENDA – JANUARY 14, 2020 Page 1 of 3
NOTICE AND AGENDA OF
PUBLIC MEETING
METROPOLITAN PLANNING SUBCOMMITTEE
9:00 A.M. JANUARY 14, 2020
RTC/RFCD ADMINISTRATION BUILDING 600 S. GRAND CENTRAL PARKWAY, ROOM 108
LAS VEGAS, NV 89106 (702) 676-1500
This agenda with full backup is available at the Regional Transportation Commission Administration Building, 600 S. Grand Central Pkwy,
Las Vegas, Nevada; the Regional Transportation Commission’s website, http://www.rtcsnv.com; or by contacting Marin DuBois at
(702) 676-1836.
THIS MEETING HAS BEEN PROPERLY NOTICED AND POSTED IN THE FOLLOWING LOCATIONS: Clark County Government Center 500 S. Grand Central Pkwy. Las Vegas, NV 89155
City of Henderson Office of the City Clerk 240 Water Street Henderson, NV 89015
CC Regional Justice Center 200 Lewis Ave. Las Vegas, NV 89155
RTC 600 S. Grand Central Pkwy. Las Vegas, NV 89106
RTC Website www.rtcsnv.com Nevada Public Notice https://notice.nv.gov
BY: ________________________________________________________
DocuSign Envelope ID: 5F52C997-71CC-4430-954B-6F3AA9C8B400
METROPOLITAN PLANNING SUBCOMMITTEE AGENDA – JANUARY 14, 2020 Page 2 of 3
Items 2 through 6 and 8 are items for possible action. Items 1, 7, 9, and 10 are discussion items and no action can be taken. Please be advised that the Metropolitan Planning Subcommittee has the discretion to take items on the agenda out of order, combine two or more agenda items for consideration, remove an item from the agenda or delay discussion relating to an item on the agenda any time. 1. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION CONSENT AGENDA (ITEMS 2 THROUGH 3) All items marked with asterisks (**) are considered by the Regional Transportation Commission Metropolitan Planning Subcommittee to be routine and may be acted upon in one motion. However, the Metropolitan Planning Subcommittee may discuss any consent item individually if requested by a Committee member or a citizen when the consent agenda is considered for approval. **2. APPROVAL OF THE MINUTES: Meeting of November 12, 2019 (FOR POSSIBLE ACTION)
**3. RECEIVE NOTIFICATION THAT THE MONTHLY CAPITAL PROJECT TRACKING REPORT
AND THE UNIFIED PLANNING WORK PROGRAM PROJECT ACTIVITY STATUS REPORT HAVE BEEN POSTED TO THE RTC’S WEBSITE (FOR POSSIBLE ACTION)
**END OF CONSENT AGENDA**
4. RECEIVE AN UPDATE ON AMENDMENT CLARK 19-27 TO THE 2017-2040 REGIONAL
TRANSPORTATION PLAN (FOR POSSIBLE ACTION) 5. APPROVE REGIONAL TRANSPORTATION PLAN AMENDMENT CLARK 19-29 TO THE
2017-2040 REGIONAL TRANSPORTATION PLAN (FOR POSSIBLE ACTION) 6. RECEIVE AN UPDATE ON DEVELOPMENT OF ON BOARD, THE REGIONAL MOBILITY
PLAN (FOR POSSIBLE ACTION) 7. RECEIVE AN UPDATE ON IMPLEMENTATION ACTIVITY OF THE REGIONAL PLAN 8. APPROVE THE FISCAL YEARS 2020-2021 UNIFIED PLANNING WORK PROGRAM –
AMENDMENT TWO (FOR POSSIBLE ACTION) 9. RECEIVE REGIONAL STAFF UPDATES 10. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION
DocuSign Envelope ID: 5F52C997-71CC-4430-954B-6F3AA9C8B400
METROPOLITAN PLANNING SUBCOMMITTEE AGENDA – JANUARY 14, 2020 Page 3 of 3
During the initial Citizens Participation, any citizen in the audience may address the Subcommittee on an item featured on the agenda. During the final Citizens Participation, any citizens in the audience may address the Subcommittee on matters within the Subcommittee’s jurisdiction, but not necessarily featured on the agenda. No vote can be taken on a matter not listed on the posted agenda; however, the Subcommittee can direct that the matter be placed on a future agenda. Each citizen must be recognized by the Chair. The citizen is then asked to approach the microphone at the podium, to state his or her name, and to spell the last name for the record. The Chair may limit remarks to three minutes’ duration, if such remarks are disruptive to the meeting or not within the Committee’s jurisdiction. The Regional Transportation Commission of Southern Nevada keeps the official record of all proceedings of the meeting. In order to maintain a complete and accurate record, copies of documents used during presentations should be submitted to the Recording Secretary. The Regional Transportation Commission of Southern Nevada appreciates the time citizens devote to be involved in this important process.
In compliance with Nevada Revised Statute 241.035(4), the Regional Transportation Commission of Southern Nevada shall create an audio and/or video recording of the meeting and retain such recording(s) for the required period of time. The Regional Transportation Commission of Southern Nevada Meeting Room and Conference Room are accessible to the disabled. Assistive listening devices are available for the hearing impaired. A sign language interpreter for the deaf will be made available with a forty-eight hour advance request to the Regional Transportation Commission of Southern Nevada offices. Phone: 702-676-1500 TDD: 702-676-1834
Any action taken on these items is advisory to the Regional Transportation Commission of Southern Nevada.
DocuSign Envelope ID: 5F52C997-71CC-4430-954B-6F3AA9C8B400
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [ ] Transit [ ] Administration and Finance [X] SUBJECT: CITIZENS PARTICIPATION PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL TRANSPORTATION SYSTEM
FISCAL IMPACT: None BACKGROUND: In accordance with State of Nevada Open Meeting Law, the Regional Transportation Commission of Southern Nevada (RTC) Metropolitan Planning Subcommittee (Subcommittee) shall invite interested persons to make comments. For the initial Citizens Participation, the public should address items on the current agenda. For the final Citizens Participation, interested persons may make comments on matters within the Subcommittee’s jurisdiction, but not necessarily on the current agenda. No action can be taken on any matter discussed under this item, although the Subcommittee can direct that it be placed on a future agenda. Respectfully submitted, ____________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #1
January 14, 2020 mld Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
MINUTES METROPOLITAN PLANNING SUBCOMMITTEE
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA NOVEMBER 12, 2019
These minutes are prepared in compliance with NRS 241.035. Text is in summarized rather than verbatim format. For complete contents, please refer to
meeting recordings on file at the Regional Transportation Commission.
THIS MEETING WAS PROPERLY NOTICED AND POSTED IN THE FOLLOWING LOCATIONS ON NOVEMBER 4, 2019
Clark County Government Center 500 S. Grand Central Pkwy. Las Vegas, NV 89155
City of Henderson Office of the City Clerk 240 Water Street Henderson, NV 89015
CC Regional Justice Center 200 Lewis Ave. Las Vegas, NV 89155
RTC 600 S. Grand Central Pkwy. Las Vegas, NV 89106
RTC Website www.rtcsnv.com Nevada Public Notice https://notice.nv.gov
CALL TO ORDER Vice-Chair Dimitrios Karapanagiotis, Clark County School District, called the meeting to order at 9:01 a.m. in Meeting Room 108 of the Regional Transportation Commission of Southern Nevada Administration Building. MEMBERS PRESENT: Dimitrios Karapanagiotis, Vice-Chair, Clark County School District Mario Bermudez, Clark County Comprehensive Planning Vivian Browning, Bureau of Land Management Don Johnson, MV Transportation Marc Perla, Keolis North America Ken Satowski, Nevada Department of Transportation (Alternate) Sean Robertson, City of Henderson (Alternate) Mark Silverstein, Clark County Department of Aviation Fred Solis, City of Las Vegas Robert Tekniepe, Clark County Department of Air Quality MEMBERS ABSENT: Johanna Murphy, Chair, City of North Las Vegas Department of Planning Susan Danielwicz, City of Boulder City Nass Diallo, Las Vegas Valley Water District Victor Rodriguez, Nellis Air Force Base Richard Secrist, City of Mesquite RTC STAFF: Craig Raborn, Director of Metropolitan Planning Organization Andrew Kjellman, Manager of Transportation Planning Rae Lathrop, Manager of Regional Planning Daniel Fazekas, Senior Transportation Planner Michelle Larime, Senior Regional Planner Marin DuBois, Management Analyst INTERESTED PARTIES: Marco Velotta, City of Las Vegas MPS Item #2
January 14, 2020 Consent
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 2 of 14 Item:
1. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION Comments:
No comments were made. Motion: No motion was necessary. Vote/Summary: No vote was taken.
CONSENT AGENDA (ITEMS 2 THROUGH 3) All items marked with asterisks (**) are considered by the Regional Transportation Commission of Southern Nevada Metropolitan Planning Subcommittee to be routine and may be acted upon in one motion. However, the Metropolitan Planning Subcommittee may discuss any consent item individually if requested by a Subcommittee member or a citizen when the consent agenda is considered for approval. Item:
**2. APPROVAL OF THE MINUTES: Meeting of September 10, 2019 (FOR POSSIBLE ACTION) Item:
**3. RECEIVE NOTIFICATION THAT THE MONTHLY CAPITAL PROJECT TRACKING REPORT AND THE UNIFIED PLANNING WORK PROGRAM PROJECT ACTIVITY STATUS REPORT HAVE BEEN POSTED TO THE RTC’S WEBSITE (FOR POSSIBLE ACTION)
Comments:
No comments were made. Motion: Mr. Mario Bermudez, Clark County Comprehensive Planning, made a motion to approve the Consent Agenda. Vote/Summary: 10 Ayes. 0 Nays. The motion carried. Ayes: Dimitrios Karapanagiotis, Mario Bermudez, Vivian Browning, Don Johnson, Marc Perla, Ken Satowski, Sean Robertson, Mark Silverstein, Fred Solis, Robert Tekniepe Nays: None Absent: Johanna Murphy, Susan Danielwicz, Nass Diallo, Victor Rodriguez, Richard Secrist
**END OF CONSENT AGENDA**
Item:
4. RECEIVE AN UPDATE ON THE CITY OF LAS VEGAS PORTION OF THE MARYLAND PARKWAY CORRIDOR TRANSIT-ORIENTED DEVELOPMENT PLAN (FOR POSSIBLE ACTION)
Comments:
Mr. Craig Raborn, Director of Metropolitan Planning Organization for the Regional Transportation Commission of Southern Nevada (RTC), introduced Mr. Daniel Fazekas, Senior Transportation Planner for the RTC, to provide an update on the Maryland Parkway Corridor Transit-Oriented Development (TOD) Plan. Following a detailed PowerPoint presentation [attached], Mr. Fazekas began with an overview of the project, which is a joint venture between the City of Las Vegas and the RTC. He discussed the application process, the timeline, and the project’s funding award, which totals
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 3 of 14
$400,000.00 including a $100,000.00 local match. He also outlined the project’s goal to provide a framework to identify and plan transit station areas with the greatest TOD potential. Corridor Map Mr. Fazekas reviewed a map of the project’s corridor, highlighting changes to the boundaries made since the last update. These changes included adding a quarter-mile influence area around each of the station areas. He also noted that the City of Las Vegas would be primarily responsible for the land use portion of the plan. Tasks and Milestones Continuing, Mr. Fazekas discussed the project’s tasks and milestones. A public kick-off for the project, which was tentatively scheduled for December 2019, was pushed to January 2020. The community engagement plan for the project is currently under development. Mr. Fazekas stressed the importance of actively engaging with community stakeholders located around the Maryland Parkway corridor. He continued with a list of the different assessments and components of the project. This list includes:
An Existing Conditions and Needs Assessment, which would collect the data necessary to evaluate existing transportation and land use conditions and recommend improvements within the project area.
A Market Analysis of Districts and Transit Stops with greatest TOD potential. The analysis will identify market readiness, regulatory opportunities, and form-based zoning needs within the corridor. It will also provide a foundation to guide public and private investment within station areas
Three Station Area TOD Plans that will create strategies and policies that help create a vision to increase housing and employment options for all income levels and support economic development that encourages private investment within station-area locations along the corridor.
A Workforce Housing Plan that will focus on enhancing mixed-use development within a form-based code, so residents of any income level have other transportation options to commute and take care of daily needs.
A Value Capture Toolkit and Performance Measures template that will identify and quantify TOD potential as well as track development, multimodal-infrastructure investment, and socioeconomic data within targeted station areas
A Final Plan Report summarizing existing conditions, market analysis, recommended development and infrastructure projects, and implementation strategy and all other specific elements.
He added that the target completion date for the project is December 2020. Clark County TOD Plan Mr. Fazekas also discussed the TOD plan Clark County developed for the portions of the Maryland Parkway corridor located in Clark County. The scope is similar to the City of Las Vegas’s plan and is expected to follow the same development timeline. City of Las Vegas 2050 Master Plan Mr. Marco Velotta, City of Las Vegas, discussed how the Maryland Parkway Corridor TOD plan aligns with the 2050 Master Plan for the City of Las Vegas. The outcomes that are developed from Maryland Parkway TOD Plan will be incorporated into the 2050 Master Plan and implemented in other districts. Mr. Fazekas added that the Maryland Parkway TOD Plan will also serve as a template for implementation of On Board, the regional mobility plan.
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 4 of 14
Motion No motion was necessary. Vote/Summary: No vote was taken.
Item:
5. RECEIVE AN UPDATE ON THE PHASE II LIVABLE CENTERS STUDY AT GALLERIA (FOR POSSIBLE ACTION)
Comments:
Mr. Craig Raborn, Director of Metropolitan Planning Organization for the Regional Transportation Commission of Southern Nevada (RTC), introduced Mr. Daniel Fazekas, Senior Transportation Planner for the RTC, to provide an update on the Livable Centers Study Phase II. Following a detailed PowerPoint presentation [included], Mr. Fazekas discussed the Livable Centers purpose and goals. Livable Centers are vibrant walkable communities that offer increased mobility options, encourage healthy lifestyles, and provide improved access to jobs and services. The RTC began exploring the Livable Centers concept because it closely aligns with the goals and neighborhood vision included in the Southern Nevada Strong (SNS) Regional Plan. The RTC awards funding to the different member agencies in order to conduct a study assessment that determines whether a certain area can become a Livable Center. Phase I Next, Mr. Fazekas provided a brief update on the Phase I project. The City of North Las Vegas was awarded the funding to develop the Deer Springs Livable Centers Study. The study is expected to be completed by January 2020. Phase II Then Mr. Fazekas discussed the Phase II project awarded to the City of Henderson. The Livable Center at the Galleria Study (Galleria Study) encompasses the site area around the Galleria Mall. He reviewed a map of the site and the study’s overall goals. These goals include the following:
Foster multimodal access and connectivity Develop a diversity of housing options and a sense of place Encourage walkability and connections within and between the nodes of community activity Build environmental strategies that support a strong and diverse economy Provide design solutions for an enhanced, attractive, connected, and safe public realm Identify existing as well as potential future pedestrian generators
Tasks & Milestones Continuing, Mr. Fazekas reviewed the Galleria Study’s tasks and milestones. The project began in November 2019 and is expected to be completed within a year. The study will include a needs assessment, concept plan, design guidelines, and implementation plan. He also clarified the difference between the transit-oriented development (TOD) plans being developed with the City of Las Vegas and Clark County and the Livable Centers studies. He explained that the Livable Centers studies give ownership of the plan to the member jurisdictions. The RTC is involved only to ensure that the plan aligns with regional transportation goals and the SNS Regional Plan. Phase III Mr. Fazekas stated that the next call for proposals will be held in the next six to nine months. Although it started as a pilot project, the success of the project encouraged the RTC to continue it.
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 5 of 14
Mr. Sean Robertson, City of Henderson, added that the introductory meetings with the property owners for the Galleria Study were underway and had thus far been positive. Mr. Raborn commented on the importance of ownership of the planning process among the jurisdictions and how ownership correlates to a higher probability of implementation. He also discussed the RTC’s role in implementation funding and their commitment to work with the jurisdictions to allocate towards infrastructure projects identified in the different studies. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
6. APPROVE THE PUBLIC PARTICIPATION PLAN (FOR POSSIBLE ACTION) Comments:
Mr. Andrew Kjellman, Manager of Transportation Planning for the Regional Transportation Commission of Southern Nevada (RTC), began by saying the Public Participation Plan (PPP) was originally brought before the Metropolitan Planning Subcommittee (MPS) in September 2019. It is returning at this meeting for action and to share public comment period survey results. Mr. Kjellman went on to describe the PPP as a federally-required document, approved by the Federal Highway Administration (FHWA), and is usually a precursor for the Regional Transportation Plan (RTP) update. It guides outreach transportation and transit plans as well as how the RTP and Transportation Improvement Program are amended. It also shares with the public how to get involved in transportation decision making. Next, Mr. Kjellman shared a slide displaying the survey results mentioned. More than 2,000 responses were received. The questions asked included the following:
How do you most often hear about news and events in your community? o Social media, internet, and television were the top responses.
How would you most likely provide your input to the RTC? o Email and online surveys were the top responses.
Mr. Kjellman then provided a summary of progress as it pertained to the PPP. He said a 45-day public comment period was held during the summer. The PPP had also been presented to the Metropolitan Planning Subcommittee previously, and it will be taken to the Executive Advisory Committee as well as the RTC Board of Commissioners for approval. After concluding his report, RTC staff recommended approval of the item. Motion: Mr. Sean Robertson, City of Henderson, made a motion to approve the Public Participation Plan. Vote/Summary: 10 Ayes. 0 Nays. The motion carried. Ayes: Dimitrios Karapanagiotis, Mario Bermudez, Vivian Browning, Don Johnson, Marc Perla, Ken Satowski, Sean Robertson, Mark Silverstein, Fred Solis, Robert Tekniepe Nays: None Absent: Johanna Murphy, Susan Danielwicz, Nass Diallo, Victor Rodriguez, Richard Secrist
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 6 of 14
Item:
7. APPROVE THE FISCAL YEARS 2020-2021 UNIFIED PLANNING WORK PROGRAM – AMENDMENT ONE (FOR POSSIBLE ACTION)
Comments:
Mr. Andrew Kjellman, Manager of Transportation Planning for the Regional Transportation Commission of Southern Nevada (RTC), presented an update regarding the Unified Planning Work Program (UPWP). This item is an amendment to the UPWP, typically conducted each fall to reflect the fact that the document is prepared in the spring, adopted over the summer, and cleaned up in the fall. Following a detailed PowerPoint presentation [attached], Mr. Kjellman reviewed how the UPWP identifies the regional studies that will be conducted as well as local agency-proposed studies. Mr. Kjellman said there are currently nine locally developed studies included in the UPWP. The document covers a two-year planning period. Mr. Kjellman said there are three main actions included in Amendment 1:
Two studies (Freight Modeling and Visitor Population Synthesizer) consolidated into one new study: Visitor & Freight Model Components Update.
Two studies changed project initiation year (TNC Data Analysis Methodology and Southern Nevada Freight Plan Update).
Six studies adjusted carry-over balances between fiscal years: o Coordinated Human Services Transportation Plan o Bruce Street Green and Complete Street o Citywide Pedestrian and Bicycle Plan o Stadium District Transportation Plan o Pedestrian Comfort Study and Demonstration Project (Study Complete) o River Mountains Loop Trail Improvements Study (Study Complete)
Mr. Kjellman said that total funding changes resulting from Amendment 1 would be an increase of $84,701.00 in Fiscal Year 2020. Also, the funding increase is within the limits of the $6.3 million available in Fiscal Year 2020. Motion: Mr. Mario Bermudez, Clark County Comprehensive Planning, made a motion to approve the Fiscal Years 2020-2021 Unified Planning Work Program – Amendment 1. Vote/Summary: 10 Ayes. 0 Nays. The motion carried. Ayes: Dimitrios Karapanagiotis, Mario Bermudez, Vivian Browning, Don Johnson, Marc Perla, Ken Satowski, Sean Robertson, Mark Silverstein, Fred Solis, Robert Tekniepe Nays: None Absent: Johanna Murphy, Susan Danielwicz, Nass Diallo, Victor Rodriguez, Richard Secrist
Item:
8. RECEIVE AN UPDATE ON THE DEVELOPMENT OF ON BOARD, THE REGIONAL MOBILITY PLAN (FOR POSSIBLE ACTION)
Comments:
Mr. Craig Raborn, Director of Metropolitan Planning Organization for the Regional Transportation Commission of Southern Nevada (RTC), provided an update regarding the On Board Regional Mobility Plan (On Board). Following a detailed PowerPoint presentation [attached], Mr. Raborn began by stating that this was the first time the On Board draft plan recommendations would be presented to a public committee. The project has been underway for just longer than two years, and the current stage is to present recommendations with the intention of bringing the project to a close. After the
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 7 of 14
recommendations are shared, there will be a 90-day public comment period followed by adoption some time mid-spring 2020. Mr. Raborn went on to say On Board originally started as the high-capacity transit (HCT) plan. It has since grown broader than just HCT. He shared a map showing a proposed Southern Nevada HCT system. This includes 19 proposed lines, is broken into two phases, and ranges from rapid bus transit to light rail transit (LRT). Project Phases Mr. Raborn noted that, currently, On Board is not a fiscally restrained plan. This means it is purely aspirational at this point and does not have dollar values attached. It is the vision of what mobility could look like in Southern Nevada. He shared the intended phases moving forward:
Completion of the Maryland Parkway HCT project First phase would include three LRT or bus rapid transit (BRT) lines and six rapid bus lines Second phase would include 3 more BRT lines and five more rapid bus lines
Mr. Raborn said recommendations from the Resort Corridor Feasibility Study to continue exploring rail-based transportation on Las Vegas Boulevard was included in the On Board plan. Southern Nevada Strong (SNS) Initiatives Next, Mr. Raborn went on to say On Board is going back to try and address the SNS response to growth in the region. He said a total of 15 regional priorities have been identified as a result of public outreach surveys. These include the following:
1. Improved Road and Transit Safety 2. Fewer Traffic Jams 3. High Capacity Transit (including light rail) 4. Better Connectivity 5. Well-Maintained Roads 6. Frequent Bus Service 7. More Transportation Choices 8. Expanded Service for Seniors, Veterans, and People with Disabilities 9. Improved Job and Housing Access 10. Better Walking and Biking Conditions 11. New Modal Technologies and Investments 12. Expanded Transit Service Area 13. New Information Technologies 14. Better Transit Stops and Stations 15. Improved Transit Security
Mr. Raborn said the Fuel Revenue Indexing (FRI) program ballot measure effectively addressed four of the top five priorities while touching on others. That said, there was still a need for a broad mobility plan for the region. This is what On Board is intended to address. Recommended Strategies Moving on, Mr. Raborn said the On Board plan recommends eight strategies. They are directly inspired by survey recommendations, and each strategy includes specific projects or programs proposed for implementation to make a strategy happen. The strategies for On Board include the following:
1. Build HCT System 2. Expand Transit Service to Maximize Access to Jobs and Housing 3. Make All Travel Options Safer and More Secure 4. Make Short Trips Easier
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 8 of 14
5. Expand Service for Seniors, Veterans, and People with Disabilities 6. Improve Connections to Major Destinations 7. Provide Reliable Transit for Resort Corridor Employees 8. Leverage New Technology to Improve Mobility
Mr. Raborn made it clear that the On Board plan was not complete. He followed up by saying during the following 90-day comment period, an extensive outreach survey would be conducted to share and rate the different On Board strategies. Information gathered during the comment period will be used to create the final plan document. Next, Mr. Raborn spoke very briefly to each of the proposed eight strategies for the On Board plan, sharing slides corresponding to each of the eight “big moves.” Each accompanying slide included an overview of the strategy, projects and programs associated with the strategy, and key benefits from implementation. Mr. Raborn noted that he would not speak in detail about each strategy, sharing only highlights and snippets, as the On Board plan includes plenty of detail for Metropolitan Planning Subcommittee (Subcommittee) members to view. Mr. Raborn showed maps and spoke about different colored sections and lines and what they mean. He also skimmed over material that detailed proposed improvements/transit implementations for areas that currently do not have HCT. The aspirational goal is to provide transit to these areas. Regional service goals as well as impacts of transit implementation are included in the current plan. Mr. Raborn mentioned that the plan includes everything from big-picture improvements to small changes that can have large impacts. Mr. Raborn stated that all eight strategies are being assessed for the risk of impact from emerging technologies. Things that could potentially be outdated by the time of implementation due to new technology likely will not be high on the list of priorities. In summary, Mr. Raborn said the next steps will be to finalize all of this information and determine specific implementation approaches. Mr. Raborn shared a broad overview of the On Board plan as it currently exists – it has eight overarching strategies and 65 specific projects or programs. Finally, Mr. Raborn shared a pie chart that divided survey results sentiment. Overall, 53 percent of 12,000 responses in RTC’s 2018 On Board Survey said that On Board should “develop new alternatives” for improving transportation, while only 11 percent want to “maintain current conditions.” He reiterated that FRI provided funding for four of the 15 initial regional priorities, leaving 11 that need funding sources. He said information would be shared as it is gathered during the upcoming public comment period. Q and A Mr. Robert Tekniepe, Clark County Department of Air Quality, asked specifically about the Number 12 regional priority – expanded transit service area – as it was shown in Slide 4. He said this particular priority was categorized as “less strong” and asked why. Mr. Raborn said this was in regard to the HCT strategy. HCT is not being provided in places that don’t currently have any kind of transit, which is why that particular priority does not rate strongly. He directed Mr. Tekniepe to the following slide, which showed expanded transit service area with a higher priority strength. Mr. Raborn said each of the 15 regional priorities was rated as they pertained to the different “big move”/On Board strategies. He said a summary table could/would be created to clarify for the final plan.
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 9 of 14
Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
9. RECEIVE AND DISCUSS A PROPOSAL TO PARTICIPATE IN A NATIONAL COHORT TO DEVELOP A REGIONAL SPATIAL DATA ANALYSIS TOOL LED BY BROOKINGS INSTITUTION (FOR POSSIBLE ACTION)
Comments:
Mr. Craig Raborn, Director of Metropolitan Planning Organization (MPO) for the Regional Transportation Commission of Southern Nevada (RTC), introduced Ms. Rae Lathrop, Manager of Regional Planning to discuss the Brookings Institution (Brookings) proposal. Following a detailed PowerPoint presentation [attached], Ms. Lathrop explained that the RTC was approached earlier this year by Brookings to participate in its expanded cohort and explore a new data tool. The RTC is presenting the proposal to the various jurisdictions and committees in order to determine whether the tool would be of benefit and to gage the level of interest since participation in the cohort would involve a two-year commitment. She described the tool’s intention, which is to combine land use, transportation, and economic development goals into one map that could potentially create a new interdisciplinary approach to public investment for economic and community development. The RTC’s goal is to create a framework for making decisions around future investments, particularly as they align with the community’s shared values and large community-wide goals. She then showed screenshots of the tool’s different functions. Portland Metro Continuing, Ms. Lathrop provided an overview of Portland Metro’s application of the tool. Originally created in partnership with Brookings, Portland Metro used the tool to develop a map that articulated the connections between the regional economy, neighborhood-level economic conditions, and their relationship to the built environment. Over the project’s 18 months, Portland Metro accomplished four major tasks:
Development of a Market Scan of metropolitan and neighborhood conditions and trends A set of agreed-upon values and recommend specific data fields and relevant measures A multivariate analytical system and application use cases Gathered design input on the tool
Regional Applications Ms. Lathrop then reviewed possible applications of the tool in Southern Nevada. As part of the cohort, the RTC is required to develop its own metrics and goals for implementation. She noted that the project would offer the opportunity to develop a shared understanding of existing conditions and common goals across the region. Although the RTC has other spatial tools, Ms. Lathrop said this tool provides the opportunity to gather data currently not available. Ms. Lathrop outlined the following possible goals:
Determine implications of TOD and develop best practices for transit and regional planning Translate regional utility projects and other investments into dollars and readiness Review the impacts of public investment, changing demographics, and tracking values over time Provide guidelines for the allocation of public incentives based on shared goals and values
She also discussed the benefits of participating and learning from the other members in the cohort, which include MPOs from Minneapolis, Minnesota and Kansas City, Missouri.
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 10 of 14
Mr. Robert Tekniepe, Clark County Department of Air Quality, inquired about the costs to participate in the cohort. Ms. Lathrop reviewed the costs, which mainly consist of travel costs to attend cohort meetings and approximately 20 percent of an RTC staff member’s time to manage the project. There is no additional fee to participate, which, she noted was rare since the majority of similar proposals require one. Mr. Tekniepe followed up with a question regarding whether RTC staff could handle another project in addition to everything it is already working on. Mr. Craig Raborn responded that it was feasible, and the potential value and outcomes are worth the time investment. Vice-Chair Dimitrios Karapanagiotis, Clark County School District, inquired about next steps in moving forward with the proposal. Ms. Lathrop responded that RTC would draft a response proposal with shared regional goals and input from the jurisdictions. Mr. Raborn added that the project would provide the opportunity to consolidate some of the RTC’s existing tools into one platform among other benefits. Mr. Ken Satowski, Nevada Department of Transportation (NDOT), asked whether partner participation would be limited to the MPO district or include all of Clark County. Mr. Raborn assumed it would cover all of Clark County unless precluded by the availability of data sources. Mr. Tekniepe asked if the tool is appropriate given the region’s population density as compared to other cities such as Portland. Ms. Lathrop didn’t think the region’s scale or sprawl would be an issue. The application would be determined by the region’s goals, and she thought there were plenty of opportunities. Mr. Raborn agreed with Ms. Lathrop’s assessment. He added that the tool’s mapping and analytical capabilities would not be impacted. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
10. RECEIVE AND DISCUSS A PROPOSAL TO UPDATE THE OPPORTUNITY SITE PLANS SINCE ADOPTION OF THE REGIONAL PLAN IN 2015 (FOR POSSIBLE ACTION)
Comments:
Ms. Michelle Larime, Senior Regional Planner for the Regional Transportation Commission of Southern Nevada (RTC), described the progress that the RTC had made in reviewing the Southern Nevada Strong (SNS) Opportunity Sites. Following a detailed PowerPoint presentation [attached], Ms. Larime provided a brief background on the issue, explaining that the four Opportunity Sites being studied in SNS include the following:
Boulder Highway at the Gibson/Broadbent intersection Downtown North Las Vegas (DTNLV) gateway site Las Vegas Medical District (LVMD) Maryland Parkway corridor
Each site represents significant opportunities for investment, revitalization, and application of goals in the SNS Regional Plan. The RTC’s goal in conducting its upcoming five-year progress report for each site is to capture and communicate what five years of planning and progress looks like in one place. Ms. Larime continued, describing that the evaluation process for each site would involve four unique phases with multiple sets of deliverables. This would help them determine timelines for goals and implementation strategies, as well as evaluation of potential partnerships to complete Opportunity Site work. There would also be site-specific deliverables designed to address the local needs of each agency
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 11 of 14
and provide specific input on how to overcome challenges inherent to each site. Ms. Larime then provided a breakdown of details of each Opportunity Site assessment. Boulder Highway at Gibson Road/Broadbent Boulevard Strategies here focus on analyzing development potential of this undeveloped land, with the vision of creating a thriving, transit-oriented neighborhood. New developments have occurred near the site, which may offer the potential for public/private partnerships. Ms. Larime said that the City of Henderson had already allocated funding and begun the design phase of its part of Boulder Highway to align with the priorities from Re-Imagine Boulder Highway. In terms of challenges, large rights-of-way, above ground utilities, and current transit routes all present issues to development. Site-specific deliverables here include the following:
Research and data analysis that can support the development of a Redevelopment request-for-proposal (RFP) for the site
SNS to assist with regional and national promotion for developing the site SNS to identify new funding sources and partnerships to assist with the development of the site Detailed case study research around how other communities have successfully overcome similar
development challenges in their community (most notable large right-of-way) Downtown North Las Vegas Strategies here focus on identifying projects, policies, incentives, and programs that could better support the revitalization of North Las Vegas. So far, the City of North Las Vegas (NLV) had conducted several planning studies and initiatives, most notably the Lake Mead Village West Plan. NLV has also invested in the region, including Complete Street improvements, and performing many other outreach efforts to improve the area. Ms. Larime noted that land value and rents were beginning to rise in the area, a good sign for the development market. In terms of challenges, NLV is limited on staff and resources. There are language barriers to overcome, and there is a lack of specialty services in specific regions. Site specific deliverables here include the following:
Mapping and production of marketing material for promoting the site to help support NLV New research and case studies for achieving DTNLV vision – incentives and catalyst projects in
other communities New strategies for overcoming language and communication barriers within the downtown
community New placemaking strategies for potential districts and/or cultural areas within the downtown
footprint Las Vegas Medical District Strategies here work toward creating a world-class medical district that will provide a broad range of benefits for Southern Nevada residents. This site has seen much progress over the past few years, with Ms. Larime noting the City of Las Vegas’s integration of studies and form-based code for a portion of the district as an example. The redevelopment district has been expanded, and Project Neon was completed. Other streets in the region were nearing integration of their Complete Streets designs as well. In terms of challenges, there is a notable lack of land use for new developments, some uncertainty around the new developments, and some misunderstandings about the form-based code. There will also be shared management issues to resolve. Site-specific deliverables here include the following:
Summarized lessons learned around implementing new, form-based code and provide new strategies for improving outreach and communication with neighborhoods as the city continues to implement the code throughout the Downtown Master Plan districts
Research and case studies around shared public/private management within business districts Research and case studies around retrofitting a car-centric district to pedestrian friendly
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 12 of 14
Explore new ideas for connecting the LVMD with adjacent districts and neighborhoods (Historic Westside) and to regional assets such as University of Nevada, Las Vegas (UNLV) main campus
Maryland Parkway Corridor Strategies here involve incentivizing revitalization of the corridor through transit-oriented development. There have been many studies and initiatives done on this region. Both the City of Las Vegas and Clark County are kicking off a transit-oriented development planning grant that will provide input for station planning priorities and identify opportunities for transit-oriented development in the corridor. UNLV has also explored options for public/private partnerships with the goal of building out more mixed-use and high-density student housing, catalysts for shaping the future of the built environment in the corridor. In terms of challenges, Maryland Parkway is a highly auto-centric corridor, there is limited land availability, and there are multiple out-of-state property owners. Site-specific deliverables here include the following:
Research and case studies for retrofitting car-centric corridors and how to incorporate the future of high-capacity transit into new development
Re-engagement with key stakeholders and research strategies for continued stakeholder engagement in corridor planning
Research best practices for urban sustainability and resiliency, such as extreme heat mitigation, opportunities for cooling/emergency stations, greening pedestrian environment, and more
More potential documentation, depending on the outcome of the transit-oriented development planning grant
Project Timeline Ms. Larime stated that staff anticipated taking 18 months to update all four Opportunity Sites. A general timeline for project progress had already been built, with each update occurring every few months. This system will ensure that staff resources are used appropriately and that each region is given the time it needs. She listed a rough outline of the proposed timeline:
DTNLV – Nov. 2019 - May 2020 LVMD – Feb. – Aug. 2020 Boulder Highway – May - Nov. 2020 Maryland Parkway – Aug. 2020 - Feb. 2021
In closing, Ms. Larime stated that staff is working with the partners to get these plans in place, and she said that anyone with feedback on the process could contribute. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
11. REVIEW AND RECOMMEND WORK PROGRAM ACTIVITIES FOR ADMINISTERING THE SOUTHERN NEVADA STRONG REGIONAL PLAN (FOR POSSIBLE ACTION)
Comments:
Mr. Craig Raborn, Director of Metropolitan Planning Organization for the Regional Transportation Commission of Southern Nevada (RTC), described how as the region’s federally designated metropolitan planning organization (MPO), it is required to have a work program. Southern Nevada Strong (SNS) is the region’s federally recognized policy plan. The team dedicated to the administration of SNS is now organized inside the MPO, so the MPO’s work program will be updated to include
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 13 of 14
project and activities related to SNS. The proposed work program will describe how to administer the plan effectively. Mr. Raborn noted that the RTC does not directly implement SNS, as that was left to the local jurisdictions. However, the RTC does implement several small aspects of the plan as the transportation planning and transit agency, in addition to being the core administrator. Administrative Tasks Mr. Raborn described a few of the tasks identified in SNS, again noting the RTC’s role as a regional core administrator. Other tasks include regional plan updates, which include, in part, the Opportunity Site updates. These tasks are just part of what the RTC is putting into its formal planning efforts. Another task noted by Mr. Raborn was the Citizens’ Planning Academy, an effort to elevate planning and understanding among local governments and the public overall. The last task described was developing an Implementation Report. This is the RTC’s effort to collect data on all SNS progress from all jurisdictions within a single document. Regional Planning and Research Tasks Taking a step back, Mr. Raborn described a second set of initiatives currently being worked on. These are the RTC’s regional planning and research tasks. He reviewed a few of these tasks to include future housing inventory and needs analysis, extreme heat events coordination response study, and inventory of regional sustainability planning tools and techniques. Mr. Raborn noted that there are multiple approaches for deploying these tasks being attempted by jurisdictions, all of which are valid. He suggested that the members review the pros and cons of these methods to determine which plans and tools should be formalized. Mr. Mark Silverstein, Clark County Department of Aviation, described that there were many things happening across the private entities, resorts, and non-government organizations in regard to sustainability programs. He said it would be helpful to review all of these uses. Mr. Raborn agreed and said that type of review was a key goal of the plan. Mr. Raborn detailed that the goal is not to recreate what others were doing, only to look at their options. It may come out that there is no need for a regional plan. One of the last projects described by Mr. Raborn was the Southern Nevada Water Authority’s Tree Canopy Study. They had reached out to the RTC for help with the social equity elements of the review. Mr. Raborn stated that while future tasks may be added over time, this was a summary of where the RTC is now and which tasks are most tightly linked to planning efforts. He briefly detailed efforts in regard to the Extreme Heat Study, describing the importance of this type of analysis. Not having this data has led to higher heat-related mortality rates, so it was crucial that these assessments get done. Overall, he said the plan is still a ways off from adoption, but once it is adopted by the Executive Advisory Committee (EAC) and SNS Steering Committee, it will be included as an appendix in the Unified Planning Work Program. Q and A Mr. Robert Tekniepe, Clark County Department of Air Quality, noted that the Southern Nevada Regional Planning Coalition (SNRPC) had recently disbanded and asked about the logistics of the RTC administering the program, with that in mind. Mr. Raborn replied that the SNRPC did vote to disband, but that the issue was complicated. There was significant restructuring internally that had to be done to make sure everything stays compliant. Overall, Mr. Raborn stated that the work program assumed the status quo for how things have been and did not take any position on what the SNRPC should do or
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of November 12, 2019 Page 14 of 14
might end up doing. The RTC will administer the regional plan on behalf of the SNRPC, and based on changes, would update the planning accordingly. Mr. Tekniepe asked for further clarification on who Mr. Raborn reported to in this area in lieu of the SNRPC. Mr. Raborn replied that there is an SNS Steering Committee with representatives from local agencies. This was a primary point of contact. He said that the next meeting with them would occur in January 2020, at which time Mr. Raborn would bring these documents forward. Vice-Chair Dimitrios Karpanagiotis, Clark County School District, asked how flexible this program is. Mr. Raborn explained that they typically go through an amendment process for updates, so changes are possible. These programs are written to keep them administrative in nature, intended to outline the major efforts and deliverables. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
12. RECEIVE REGIONAL STAFF UPDATES Comments:
Mr. Robert Tekniepe, Clark County Department of Air Quality, detailed that his department was in the process of recruiting a sustainability officer for Clark County in the air quality department, offering details to anyone who is interested in the function. Mr. Craig Raborn, Director of Metropolitan Planning Organization, Regional Transportation Commission of Southern Nevada (RTC), stated that the RTC is not committing to a sustainability plan; it is just beginning a review process to see what should be done. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item:
13. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION Comments:
No comments were made. Motion: No motion was necessary. Vote/Summary: No vote was taken.
ADJOURNMENT The meeting adjourned at 11:17 a.m. Respectfully submitted, _________________________________ MARIN DUBOIS Recording Secretary
_________________________________ MAREK BIERNACINSKI Transcription Secretary
DocuSign Envelope ID: C5CD9B6E-A40A-49D9-BAE0-95074C386229
Minutes-Metropolitan Planning Subcommittee Meeting of September 10, 2019 Page 7 of 8
Nevada Health District (SNHD) Racial and Ethnic Approaches to Community Health (REACH) grant. SNS staff assisted with the grant application and is currently helping develop a health impact assessment. Building Capacity for Implementation Finally, Ms. Lathrop mentioned how over the past couple of months, SNS staff was heavily involved in assisting with the City of Las Vegas master plan update. Staff provided technical expertise regarding the SNS Regional Plan and with community outreach. The Citizen Planning Academy is a new project the SNS team began working on this past summer to help educate the community about the general planning process and opportunities to get involved. She also reviewed some of the tools available on the SNS website. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item: 12. RECEIVE REGIONAL STAFF UPDATES Comments: Mr. Craig Raborn, Director of Metropolitan Planning Organization (MPO) for the Regional Transportation Commission of Southern Nevada (RTC), discussed upcoming work plans such as the new Regional Transportation Plan (RTP), the Regional Walkability Plan, and the Unified Planning Work Program (UPWP) projects and mentioned the importance of getting input from the Metropolitan Planning Subcommittee (MPS). Vice-Chair Johanna Murphy, City of North Las Vegas Department of Planning, informed the MPS that the Southern Nevada Regional Planning Coalition (SNRPC) board voted to disband. SNRPC staff will be working on a transition plan over the next year. Mr. Mark Silverstein, Clark County Department of Aviation, provided an update on Clark County’s Memorandum of Understanding (MOU) with the Federal Aviation Administration (FAA) and Bureau of Land Management (BLM) for the Southern Nevada Supplemental Airport in Ivanpah Valley. The MOU requireds Clark County (County) to complete certain planning tasks before reinitiate the National Environmental Policy Act (NEPA) process would be reinitiated. The County already issued a request for qualifications (RFQ) for planning services related to the airport. Mr. Silverstein also gave a brief recap of a meeting with Brightline/Virgin Trains USA representatives, during which they talked about a proposed rail station at Las Vegas Boulevard and Robindale Road as well as proposing a realignment of Las Vegas Boulevard between Jean Avenue and Sloan Road. The NEPA process for the realignment is tentatively scheduled for completion by January 2020. Motion: No motion was necessary. Vote/Summary: No vote was taken.
Item: 13. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION Comments: No comments were made.
1
MARYLAND PARKWAY CORRIDOR TRANSIT-ORIENTED DEVELOPMENT (TOD) PLAN
• $300,000 grant from the Federal Transit Administration (FTA)
• To develop a transit-oriented development (TOD) plan along Maryland Parkway within the City of Las Vegas
CITY OF LAS VEGAS MARYLAND PARKWAY CORRIDOR TRANSIT-ORIENTED DEVELOPMENT (TOD) PLAN
2
CITY OF LAS VEGAS MARYLAND PARKWAY CORRIDOR TRANSIT-ORIENTED DEVELOPMENT (TOD) PLAN
STUDY AREA
• Project Kickoff (December 2019)
• Community/Stakeholder Engagement Plan (December 2019)
• Existing Conditions & Needs Assessment(January 2020)
• Market Analysis (Spring 2020)
• Workforce Housing Plan (Spring 2020)
• Stations Area Plans (up to three station Areas) (Summer 2020)
• Performance Measures Template/ Value Capture Toolkit (Fall 2020)
• Plan Approval (Winter 2020/2021)
Clark County Update
MARYLAND PARKWAY CORRIDOR TRANSIT-ORIENTED DEVELOPMENT (TOD) PLAN
TASKS & MILESTONES
1
Livable Centers Study - Phase II UpdateLivable Center at Galleria
Purpose & Goals:Livable centers are vibrant walkable communities that offer increased mobility options, encourage healthy lifestyles and provide improved access to jobs and services. Livable Centers are a strategy to achieve the vision and goals of the Southern Nevada Strong (SNS) regional plan for improving economic competitiveness, investing in complete communities, increasing transportation choices, and building capacity for implementation. The Livable Centers Study is a pilot program led by the Regional TransportationCommission of Southern Nevada (RTC) and Southern Nevada Strong, in partnership with a selected localjurisdiction.
LivableCenters Study - Phase I:Deer Springs Livable Centers Study (City of NorthLas Vegas)
LivableCenters Study - Phase II:Livable Center at Galleria (City of Henderson)
Livable Centers Study Program Overview
2
W Sunset Rd
W Rusell Rd
W Warm Springs Rd
NS
tep
han
ieS
t
Mar
ksS
t
GalleriaDr
Study Area Buffer (0.5 mile)
Study Area Buffer (1 mile)
N
0 0.1 0.25 0.5 mile
LivableCenter at GalleriaStudy Area
515
515
City of Henderson
Overall Goals:• Foster multimodal access and connectivity;
• Develop a diversity of housing options, and a sense of place;
• Encourage walkability, connections within and between the nodes of community activity;
• Build environmental strategies that support a strong and diverseeconomy;
• Provide design solutions for an enhanced, attractive, connected and safe public realm
• Identify existing as well as potential future pedestrian generators.
Livable Center at Galleria Scope
3
• Project Kickoff
• November 2019
• Needs Assessment
• Late January 2020
• DesignCharrette:
• April 2020
• ConceptPlan:
• April 2020
• DesignGuidelines (includingSignPlan):
• May 2020
• Implementation Plan:
• July 2020
• Adoption:
• July‐October 2020
Livable Center at GalleriaTasks and Milestones
Livable Centers Study - Phase II UpdateLivable Center at Galleria
Thank You
1
Engaging the Community
Public Participation PlanRegional Transportation Commission of Southern Nevada Metropolitan Planning Organization & Transit
Public Participation Plan
Guides outreach for transportation & transit plans
Establishes Transportation Improvement Program revision process
Shares how to get involved in transportation planning
2
0%
5%
10%
15%
20%
25%
30%
Q1. How do you most often hear about news and events in your community? (Select top 3) – 2,150 Responses
0%
5%
10%
15%
20%
25%
30%
Q2. How would you most likely provide your input to the RTC? (Select top 3) – 2,150 Responses
1
Unified Planning Work Program
• Federally required planning document.
• Establishes core activities and studies for the MPO.
• Covers a two‐year planning period.
• Amended every fall to refine project phasing, and adjust carryover balances between fiscal years.
2020-2021 UPWP AMENDMENT ONE• Two studies (Freight Modeling, and Visitor Population Synthesizer)
consolidated into one new study: Visitor & Freight Model Components Update.
• Two studies changed project initiation year (TNC Data Analysis Methodology, and Southern Nevada Freight Plan Update).
• Six studies adjusted carryover balances between fiscal years:• Coordinated Human Services Transportation Plan• Bruce Street Green and Complete Street• Citywide Pedestrian and Bicycle Plan• Stadium District Transportation Plan• Pedestrian Comfort Study and Demonstration Project (Study Complete)• River Mountains Loop Trail Improvements Study (Study Complete)
2
• Total funding changes resulting from Amendment One is an increase of $84,701 in Fiscal Year 2020.
• Funding increase is within the limits of the $6.3 million availablein Fiscal Year 2020.
2020-2021 UPWP AMENDMENT ONE
CITY CENTER................due
LIBRARY..........................3min.
TRANSIT MAP
LIBRARY..........................3min.
TRANSIT MAP
YOUR FUTURE MOBILITY PLAN
nb o a r d
o
Summary of Draft Plan RecommendationsBIG MOVESNovember 12, 2019
Proposed Southern Nevada High Capacity Transit System
YOUR FUTURE MOBILITY PLAN
nb o a r d
o
DRAFT
OverviewSouthern Nevada is one of the nation’s fastest growing regions, and the impacts of new residents, sports teams, hospitals, master planned communities, employment hubs, resorts, and education facilities are felt across the region and throughout the economy.
Southern Nevada’s local and regional agencies started planning to accommodate and manage the region’s growth and transformation in 2012, beginning with an effort called Southern Nevada Strong.
This On Board Mobility Plan addresses the transportation system and its mobility needs and priorities. The plan has been a two-year project, created with substantial community engagement, data analysis, and applied expertise from local and national experts. The plan identifies solutions that work for Southern Nevada.
The On Board Mobility Plan includes 8 Big Mobility Moves that improve quality of life in Southern Nevada, strengthen the regional economy and prepare the region’s transportation system for our expected growth over the next two decades.
Combined, the 8 Big Mobility Moves will:
• Make transportation safer, more convenient, and more comfortable;
• Make the entire transportation system more reliable and provide people with more choices for travel; and
• Help maximize regional economic competitiveness and improve transportation sustainability.
Southern Nevada's Strong: establishes the valley's first regional plan to build complete communities that provide transportation choices , employment opportunities, housing options and quality education.
Fuel Revenue Indexing Program: implements and funds a program of street and highway construction and maintenance project to address the region's backlog of unfunded projects and prepare for anticipated population growth.
On Board Regional Mobility Plan: identifies main strategies to address the changing mobility needs for Southern Nevada identifying a future with high capacity transit, expanded public transit services, more transportation options and leveraging new technologies.
Transportation Investment Business Plan: develops a vision linking the health and growth of the valley's resort and tourist economy with critical transportation improvements in the Resort Corridor and Downtown areas.
Access2040 Regional Transportation Plan: links Southern Nevada's growth, travel patterns, and transportation system into overarching performance goals including improving safety, managing congestion, improving connectivity, and maintaining infrastructure in good condition.
SOUTHERN NEVADA'S REGIONAL PLANNING CONTEXT
1
INTRODUCTION
2012-2015
2016-2017
2014-2016
2015-2016
2017-2020
YOUR FUTURE MOBILITY PLAN
nb o a r d
o
Build High Capacity Transit System: High capacity transit (HCT) is high quality, fast, and frequent transit services that operates in dedicated lanes and/or with high level of transit priority. HCT includes light rail, Bus Rapid Transit, which is light rail like service provided with buses, and Rapid Bus, which consists of a mix of transit measures, much like the SDX that operates serves downtown Las Vegas and the Strip. RTC is currently planning Southern Nevada's first BRT line on Maryland Parkway.
Expand Transit Service to Maximize Access to Jobs and Housing: As southern Nevada continues to grow, there will be a need for more robust transit services. On Board will increase service in the region in line with this growth and expand service to new areas, as well as new approaches such as demand responsive service and partnerships with companies like Uber and Lyft. In all cases, transit services will reflect local needs while also being cost effective. On Board's goal is to expand transit service so that 75% of the region's residents are within a 1/2 mile of bus service, and 100% of the region will have access to some type of public transportation service.
Make All Travel Options Safer and More Secure: On Board makes safety a top core value. The plan includes projects and programs to strengthen personal security and physical safety while riders walk to, ride and wait for the bus.
Make Short Trips Easier: On Board will make it easier and safer to walk (and ride bikes) in Southern Nevada. This may be accomplished by creating "Complete Streets" that meet the needs of all types of travelers including pedestrians, cyclists, bus riders and drivers. The plan also includes the creation of mobility hubs as a center for several types of transportation and a neighborhood gathering space for commercial and residential life.
Expand Service for Seniors, Veterans, and People with Disabilities: On Board will both expand and improve travel options for older adults, veterans and people with disabilities. Scheduled programs and projects include expanding the amount of service available, offering service in new areas and making existing services easier to understand and use.
Improve Connections to Major Destinations: On Board will improve connections to major regional destinations including McCarran International Airport as well as major job centers and event venues. These routes will be designed to connect residents and visitors directly to important locations using a combination of express bus routes, commuter services, and game day/event shuttles.
Provide Reliable Transit for Resort Corridor Employees: Over 30% of the region's jobs are along the "Resort Corridor". A large proportion of employees who work at the resorts must enter and exit through "back-of-house" entrances that are not well served by transit. This initiative would create direct services to employee entrances.
Leverage New Technology to Improve Mobility: On Board will invest in new technology to make it easier to plan, book and pay for trips. Projects real-time bus arrival information, more options for using smart phones to pay transit fares, and trip planners that include information about a variety of transportation services, including rideshare. On Board will also invest in clean fuel technologies, such as an expanded electric vehicle charging network, and transition existing buses to an all-electric fleet.
ON-BOARD'S
8 BIG MOBILITY MOVES3
Page
5
7
9
11
13
15
17
DRAFT
1OverviewHigh Capacity Transit (HCT) provides frequent and convenient service for passengers on high demand routes. HCT includes Light Rail, Bus Rapid Transit, which is light rail-like service provided with buses, and Rapid Bus, which consists of a mix of transit measures. HCT also generates economic development for the region and along the corridors where it operates. On Board would build a total of about 200 miles of HCT in Southern Nevada on 18 different routes (which will take five to 10 years for the first projects).
ImplementationThe first step in the development of HCT will be completion of High Capacity Transit on Maryland Parkway. Additional development will be in two phases over about 20 years. A proposed system map is on the inside cover, and each project is listed on the next page.
In addition:
• Until HCT is developed, existing local bus service would be improved to operate frequently to start providing improved service to future HCT passengers
• RTC would pursue public-Private Partnerships to build Transit-Oriented Developments (TOD) along High Capacity Transit routes that could generate on-going revenue and increase transit use.
Source: RTC On Board Vision Survey, 2018
“What is your impression of Light Rail?"
You told us...
High Capacity Transit “would encourage me to try a new mode of travel”
I Like It... I Don't Like It...
83%
60%
4%
BIG MOVE #1:Build High Capacity Transit System
Comparing High Capacity Transit Alternatives
3
Effectiveness in Addressing Regional Priorities Building a High Capacity Transit System in Southern Nevada will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
*See proposed system map, inside cover.
REGIONAL MOBILITY PRIORITIES
KEY
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
StrongestStrongLess Strong
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsFinish Maryland Parkway HCT Project
Phase One Projects*:
• Charleston (LRT or BRT)
• Cross-Valley Connector (BRT or LRT) [Boulder Highway-Flamingo-Decatur]
• North 5th (BRT or LRT)
• 6 Rapid Bus (Rancho, Craig, Nellis, Eastern, Sunset, Paradise)
Phase Two Projects (10+ years)*:
• Sahara (BRT)
• Craig Road (BRT)
• Eastern BRT
• 6 Rapid Bus (Jones/Rainbow, Tropicana, MLK, Nellis/Stephanie, North
Las Vegas Blvd, South Las Vegas Blvd)
Develop Resort Corridor Rail-Based Transit (“Euro-Tram”) between Downtown Las Vegas and McCarran Intl Airport Via the Strip (Long-term; ~20-year)
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
4
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
DRAFT
2OverviewAs Southern Nevada continues to grow, there will be a need for more robust transit services. On Board will increase service in the region in line with this growth and expand service to new areas, with service tailored to match local demands. This will mean frequent service for longer hours in many areas, as well as new approaches such as demand responsive services and partnerships with companies like Uber and Lyft. In all cases, transit services will reflect local needs while also being cost effective.
On Board’s goal is to expand transit service so that 75% of the region’s residents are within a ½ mile of bus service, and 100% of the region will have access to some type of public transportation service.
BIG MOVE #2:Expand Transit Service to Maximize Access to Jobs and Housing
Source: RTC On Board Vision Survey, 2018
Transit Service Preferred Outcomes
Transportation investments should improve access to jobs, housing, & medical services
Expand transit to new areas
More frequent transit on current routes
Both
Combined
37%23%24%
84%
55%
You told us...
5
On Board Service Zone Map
Effectiveness in Addressing Regional Priorities Expanding Transit Service to Maximize Access to Jobs and Housing will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsImprove and Expand Transit Access and Service Quality
• Develop Regional Service Goals (Spring 2020)
• Expand Frequent Transit Network in High Demand Areas
• Implement Frequency and Operating Hours Improvements on Existing Service
Pilot/Develop New Service Models for Low Density or Low Demand Areas
• Rideshare Partnerships in First Mile/Last Mile Connections to Transit in Suburban Areas
• Micro-Circulator Zones with Suburban Express Connectors to High Frequency Service or Major Transit Hubs
• Rideshare Partnerships for Non-Suburban First Mile/Last Mile Services
Develop Service Buy-Up Options
Transit Fare Capping Program
Reduced Fare Program for Students
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
KEY
StrongestStrongLess Strong
6
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
DRAFT
3
7
OverviewOn Board emphasizes safety and security as core values for RTC’s operations and planning. The plan calls for additional lighting, shelters, and other safety features for pedestrians and transit users and increase the overall presence of security personnel. On Board also recommends implementing active monitoring, adding cameras on buses and at stops, and developing intelligent systems to reduce potential security incidents. The plan will also identify car crash hot spots and look for ways to reduce them.
BIG MOVE #3:Make All Travel Options Safer and More Secure
Bus Stop with Safety Bollards
Floating Bus Stop
Source: RTC Access2040 Vision Survey, 2016
Source: RTC OnBoard User Survey, 2017
Identified "improved safety" as a top priority
Listed "transportation safety" as a top priority
37%
78%
You told us...
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
8
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
Effectiveness in Addressing Regional Priorities Making All Travel Options Safer and More Secure will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsTraffic Crash Review and Countermeasures Program
Bus Stop Safety & Security Improvements
• Accelerate Efforts to Move Bus Stops Back from Fast Moving Traffic
• Install Bollards at High-Volume Stops with Fast Moving Traffic
• Install Emergency Blue Light Call Boxes at High Risk Stop Locations
Utilize Established “Crime Prevention Through Environmental Design” Strategies During Design of Transit Facilities
On-Bus Security Enhancements & Presence
• Expand Transit Watch Program
• Review Criminal Codes to Ensure Appropriate Treatment of Transit-Related Criminal Activity
• Develop Technology-Based Active Security Monitoring at Bus Stops (Future Tech)
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
KEY
StrongestStrongLess Strong
DRAFT
4
9
OverviewOn Board will make it easier and safer to walk (and ride bikes) in Southern Nevada. It recommends building “Complete Streets” that meet the needs of all types of travelers including pedestrians, cyclists, bus riders and drivers. On Board will provide features like shade, landscaping, and seating for pedestrians and transit users. The plan also includes the creation of mobility hubs as a center for several types of transportation and a neighborhood gathering space for commercial and residential life.
BIG MOVE #4:Make Short Trips Easier
Crosswalk with Passenger Refuge/Waiting Area
Example of a Neighborhood Mobility Hub
Source: RTC OnBoard Vision Survey, 2018
Walking condition are
Biking condition are
28%
26%
9%
8%
"Fine the way they are"
"Fine the way they are"
"Should be better"
"Should be better"
You told us...
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
10
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
Effectiveness in Addressing Regional Priorities Making Short Trips Easier and Safer will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsMaking short trips easier and safer will require improvements to most aspects of the non-auto-centric transportation realm: sidewalks, crosswalks, transit stops, bike facilities, and connections between nearby destinations. On Board includes the following projects that can implement those improvements:
Implement Complete Streets Program
Implement Walkability Infrastructure and Education Program
Improve Amenities at Bus Stops
Make Crosswalk Improvements along Major Corridors
Develop Mid-Block Pedestrian Crossings At Long Block Segments And High Traffic Volumes
Develop Regional Mobility Hubs
Develop Neighborhood Mobility Hubs
Improve Wayfinding in High Volume Pedestrian Locations
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
KEY
StrongestStrongLess Strong
DRAFT
5
11
OverviewSome seniors, veterans and people with disabilities have difficulty finding transportation services that meet their needs. The RTC already provides service aimed at these populations with on-demand transportation programs and bus routes that connect senior communities with activity centers, like shopping centers, medical services and recreational areas. On Board will go beyond existing programs to include strategies to expand transportation services to more areas so they can serve more people. Recommendations also add new technologies to make it easier to plan, book and pay for trips (but also maintain existing methods).
Providing specialized access to transit for people who cannot easily use regular transit services increases mobility for our region’s residents who have the greatest need. Expanded programs will make it easier for these population to participate in daily life and ensure they have access to employment, health facilities, and community services.
BIG MOVE #5:Expand Service for Seniors, Veterans, and People with Disabilities
Southern Nevada Transit and Specialized Service Areas
Source: RTC OnBoard Seniors and Paratransit Survey, 2018
"Specialized senior services" is most important service
"Improved paratransit" is most important service
23%
34%
You told us...
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
REGIONAL MOBILITY PRIORITIES
12
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
Effectiveness in Addressing Regional Priorities Expanding Service for Seniors, Veterans, & People with Disabilities will directly help achieve the following priorities dentified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsDouble Silver STAR Service for Seniors
Double Flexible Demand Response (FDR) Service for Areas for Seniors
Double Service for Veterans
Provide Full Regional Coverage for People with Disabilities (Paratransit)
Provide App-Based Reservations and Fare Payment for Dedicated Services
Provide App-Based Vehicle Tracking for Dedicated Services
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
KEY
StrongestStrongLess Strong
DRAFT
6OverviewOn Board will improve connections to major regional destinations including McCarran International Airport as well as major job centers and event venues. These routes will be designed to connect residents and visitors directly to important locations using a combination of express bus routes, commuter services, and game day/event shuttles.
BIG MOVE #6:Improve Connections to Major Destinations Current and Potential Commuter Routes with Mobility Hubs
13
Source: RTC OnBoard Vision Survey, 2018
Source: RTC OnBoard User Survey, 2017
Identified "major destinations" as preferred locations for better service
Identified "frequent and fast bus service" as most important service improvement
23%
34%
You told us...See Big Move #7 for Strip Detail
Effectiveness in Addressing Regional Priorities Improving Connections to Major Destinations will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
KEY
StrongestStrongLess Strong
14
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
Projects and ProgramsProviding improved regional connections to major destinations will consist of implementing a variety of additional services:
Improve Airport Service and Connections
• Extend SDX Route to Airport
• Develop Airport Mobility Hub (TIBP: McCarran Multimodal Transportation Center)
• Serve Both Terminals With All Airport Connections
• Improve Transit-Related Wayfinding and Onsite Information
Implement Express Routes to Resort Corridor or Downtown
Improve Commuter Facilities & Services
• Develop Park and Ride Lots w/ Express Service Connections to Major Destinations
Provide Game Day and Major Event Shuttles
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
Key Benefits
DRAFT
Proposed Services to Resort Corridor Employee Entrances7
OverviewOver 30% of the region’s jobs are along the “Resort Corridor.” A large proportion of employees who work at the resorts must enter and exit through “back-of-house” entrances that that are not well served by transit. On Board will develop routes and public transit services that operate directly to and from the Resort Corridor, with short waits and convenient and reliable service to employee entrances.
BIG MOVE #7:Provide Reliable Transit for Resort Corridor Employees
15
Source: RTC OnBoard Vision Survey, 2018
Source: RTC OnBoard User Survey, 2016
Nearly 50% of survey respondents asked for better service to the Strip and Downtown
55% of survey respondents supported improving access to jobs, housing, and medical services
44% of survey respondents supported reducing costs for lower income communities
You told us...
Effectiveness in Addressing Regional Priorities Providing Reliable Transit for Resort Corridor Employees will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsProviding reliable public transit service for employees along the resort corridor and downtown will require the following programs and services:
Develop Express Shuttles to Resort Corridor or Downtown Mobility Hubs
Develop Direct Service Shuttles to “Back of House” Resort Corridor Employee Entrances
Construct Pedestrian Connections for Grade-Separated “Back of House” Locations on West Side of Strip
Develop Mobility Hubs Focused on Resort Corridor & Downtown Connections
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
KEY
StrongestStrongLess Strong
16
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
DRAFT
8OverviewAs technology changes transportation, RTC will find the most promising options to help Southern Nevada. On Board projects will make it easier to plan, book and pay for trips. Projects include real-time bus arrival information, more options for using smart phones to pay transit fares, and trip planners that include information about a variety of transportation services, including rideshare. On Board will also develop clean fuel technologies, such as a public electric vehicle charging network, and transition RTC’s buses to an all-electric transit fleet.
BIG MOVE #8:Leverage New Technology to Improve Mobility and Sustainability
Bus Stop – No Safety Bollards
17
BusBusBusBusBusBuusuuususBususussusuuuussuusBusuusssBuuussBusB StopStStStStSStStStoStopStopStopStoStStttoptopStopStoptoStopStoptopStStStopStoStopStopopS opoptopppStoppSt pppStopttopt p – N– N– N– NNNNNNNNN– NN–– – NN–– NNNNo o o SaSao Sao Sao Sao Sao Sao Sao Saao Sao Sao Sao Saoo Saoo Sao Sao SaSao afffetyfetyfetyfetyfetyfetyfefetyfetyfetytytytyyetyfetyfetyfetyfetyfetyfettyfeffetyetyfeetyetyfetyfetyfetyfetyfetyfetyffefeetyfeeffetytyfeetyyffetyfetyfetyfetytyetf y BoBBolBoBBolBolBolBololllBolBBBolollBBoBolololBoBBolBBoollBolBolBoBoololBBolooloolBollBBoBo lardlardlardardarddddddddlardllarddlarddlardlarddddddl ddddddddssssssssNew technologies will help manage roadway congestion and traffic delays
All electric buses are quieter, cleaner and less expensive to operate
Source: RTC OnBoard Vision Survey, 2018
49% of survey respondents want RTC to incorporate new transportation technologies
50% of survey respondents say that new technologies would encourage them to take a new mode of travel
You told us...
Effectiveness in Addressing Regional Priorities Improving Regional Connections to Major Destinations will directly help achieve the following priorities identified through extensive public outreach with nearly 80,000 people and multiple surveys that had almost 25,000 combined responses:
REGIONAL MOBILITY PRIORITIES
Improved Road & Transit Safety 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Fewer Traffic Jams
High Capacity Transit (including light rail)
Better Connectivity
Well-Maintained Roads
Frequent Bus Service
More Transportation Choices
Expanded Service for Seniors, Veterans, & People with Disabilities
Improved Job & Housing Access
Better Walking & Biking Conditions
New Modal Technologies & Investments
Expanded Transit Service Area
New Information Technologies
Better Transit Stops & Stations
Improved Transit Security
Projects and ProgramsLeveraging new technology to improve mobility and sustainability will require monitoring technology developments, other agencies’ implementation, and carefully determining how to integrate them into RTC’s current operations or how to implement them across the region:
Provide real-time information at high volume stops
Improve Payment Options & Information Sharing
Develop & Implement “Mobility as a Service” program and platform
Develop Public Solar Charging Network
Shift to Clean Transit Vehicles
Develop Solar Charging for RTC Transit Vehicles
Expand Travel Demand Management (TDM) Programs
Implement “FAST OS” (Freeway and Arterial System of Transportation) Technology Roadmap
Shift to Autonomous Transit Vehicles as Technology Permits (10+ years)
Track Emerging Transportation Technologies and Update Road Designs as Needed
Key BenefitsAll mobility strategies generate benefits for individual travelers, the regional economy and the environment. The graphic below provides a relative scale of the benefits.
Safety, Security& Comfort
Travel Choices& Reliability
Economic Benefits& Sustainability
KEY
StrongestStrongLess Strong
18
BIG MOVELAS VEGAS BIG MOVES BRIEFING BOOK
DRAFT
On Board Service Zones Map (Preliminary) (Strategy Two: Expand Transit Service to Maximize Access to Jobs and Housing)
19
BIG MOVES: "Providing Desired Outcomes"
Overall, 53 percent of 12,000 responses in RTC’s 2018 On Board Survey said that On Board should “develop new alternatives” for improving transportation, while only 11 percent want to “maintain current conditions.
CONTACT INFORMATION
Website: OnBoardSNV.com
Email: [email protected]
Want New Alternatives
Key
Prefer New Alternatives
Neutral
Maintain Current Conditions
Prefer Current Conditions
53%
14%19%3%
11%
DRAFT
ON
BO
AR
DD
RAFT
PLA
NR
ECO
MM
END
ATI
ON
S:S
umm
ary
Des
crip
tion
sof
Impl
emen
ting
Pro
ject
s
:;ç
VO
V?
#[
Bui
ldH
igh
Cap
acit
yT
rans
itS
yste
m
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g12
proj
ects
,en
com
pas
sin
g19
spec
ific
Hig
hC
apac
ity
Tra
nsit
Rou
tes,
imple
men
tth
isst
rate
gy
.C
ompl
ete
pro
ject
orpr
ogra
m-l
evel
plan
ning
will
beco
mp
lete
das
each
pro
ject
isfu
llyd
evel
op
ed,
ho
wev
erad
diti
onal
info
rmat
ion
about
tim
elin
es,
agen
cies
,lo
cati
ons,
and
cost
sis
under
dev
elo
pm
ent
and
will
beco
mp
lete
dpr
ior
tofi
nal
ado
pti
on
ofth
eO
nB
oard
Pla
n.
Com
plet
ede
velo
pmen
tof
the
Mar
ylan
dPk
wy
HOT
corri
dor.
The
prop
osed
proj
ectw
ould
incl
ude
an8.
7m
ilehi
gh-c
apac
itytra
nsit
syst
emto
seam
less
lylin
kac
tivity
cent
ers
alon
gM
aryl
and
Park
way
with
anex
tens
ion
toth
eLa
sV
egas
Med
ical
Dist
rict,
onAl
taDr
ive.
Prov
ide
freq
uent
and
fast
serv
ice
forp
asse
nger
son
ahi
ghde
man
dro
ute
and
will
stim
ulat
eec
onom
icde
velo
pmen
tar
ound
stat
ion
area
s.D
evel
opC
harle
ston
Blvd
.Adv
ance
dRa
pid
Tran
sitt
hrou
ghtw
oop
tions
fors
hort-
term
impl
emen
tatio
n:BR
Tfro
mD
ownt
own
Sum
mer
linto
Nel
lisBl
vd.;
orLR
Tfro
mTo
rrey
Pine
sDr
. to
Nelli
sBl
vd.(
Not
e:if
Phas
eO
nero
ute
does
note
xten
dto
Dow
ntow
nSu
mm
erlin
,tha
text
ensi
onw
ould
bein
clud
edin
Phas
eTw
o.)
Will
prov
ide
freq
uent
and
fast
serv
ice
for
pass
enge
rson
ahi
ghde
man
dro
ute
toac
cess
maj
orre
gion
alde
stin
atio
ns,
and
stim
ulat
esec
onom
icde
velo
pmen
tar
ound
stat
ion
area
s.D
evel
opA
dvan
ced
Rapi
dTr
ansi
t(BR
Tor
LRT)
onth
e“C
ross
-V
alle
yLi
ne’
that
incl
udes
porti
ons
ofB
ould
erHw
y.,
Flam
ingo
Rd.,
and
Dec
atur
Blvd
.W
illpr
ovid
efr
eque
ntan
dfa
stse
rvic
efo
rpas
seng
ers
toac
cess
the
Res
ort
Corri
dorf
rom
outly
ing
area
s,an
dst
imul
ate
econ
omic
deve
lopm
ent
arou
ndst
atio
nar
eas.
Prov
ide
serv
ice
betw
een
Nev
ada
Stat
eC
olle
gein
Hen
ders
onan
dth
ein
ters
ectio
nof
Crai
gRd
.an
dD
ecat
urBl
vd.
Dev
elop
Adv
ance
dRa
pid
Tran
sit(
BRT
orLR
T)on
N.5t
hSt
.Pr
ovid
esa
pote
ntia
lcon
nect
ion
toth
eM
aryl
and
Pkw
y.HO
Tpr
ojec
t.Pr
ovid
esfr
eque
ntan
dfa
stse
rvic
efo
rpas
seng
ers
toac
cess
maj
orre
gion
alde
stin
atio
nsan
dwi
llst
imul
ate
econ
omic
deve
lopm
ent
arou
ndst
atio
nar
eas.
Prov
ides
serv
ice
betw
een
Dow
ntow
nLa
sV
egas
and
apr
opos
edne
wUN
LVno
rthca
mpu
sin
the
City
ofN
orth
Las
Veg
as.
Met
ropo
lita
nP
lann
ing
sub
com
mit
tee
Nov
embe
r12
,20
19It
em#8
—B
acku
pM
ater
ial
2
Proj
ect
Des
crip
tion
Build
Hig
hC
apac
ityTr
ansi
tSys
tem
Phas
eO
ne:
Prov
ide
Rap
idB
usse
rvic
eon
Nel
lisBl
vd.(
from
Nelli
sAF
Bto
6Ra
pid
Bus
Rou
tes
Flam
ingo
),R
anch
oDr
.,Pa
radi
seRd
.,Ea
ster
nA
ve.
(from
(Ran
cho,
Crai
g,Fl
amin
goto
sout
hern
end)
,Su
nset
Rd.,
and
Las
Veg
asBl
vd.
Nelli
s,Ea
ster
n,So
uth
(mid
-stri
ppo
rtion
,sim
ilart
ocu
rren
tser
vice
prov
ided
bySu
nset
,Pa
radi
se)
the
Strip
&D
ownt
own
Expr
ess
(SD
X)
bus
rout
e).
Rapi
dBu
sty
pica
llydo
esno
tope
rate
inde
dica
ted
trans
itla
nes,
ordo
esso
only
inlim
ited
area
s.Ph
ase
Two:
Dev
elop
Saha
raA
ve.
BRT
infr
astru
ctur
eth
atpr
ovid
esfa
stan
dSa
hara
Ave
.(B
RT)
freq
uent
rail-
like
bus
trans
itse
rvic
ebe
twee
nD
ownt
own
Sum
mer
linan
dN
ellis
Blvd
.BR
Tis
ahi
gh-q
ualit
ybu
sse
rvic
eth
atop
erat
esin
dedi
cate
dtra
nsit
lane
swi
then
hanc
edst
atio
nsan
dde
crea
ses
trave
ltim
esan
dsp
urs
econ
omic
deve
lopm
ent.
Ifne
wtra
nsit
mod
esor
tech
nolo
gies
beco
me
avai
labl
ebe
fore
impl
emen
tatio
n,all
aspe
cts
ofth
ene
wte
chno
logy
will
beev
alua
ted.
Phas
eTw
o:D
evel
opCr
aig
Rd.
BRT
infr
astru
ctur
eth
atpr
ovid
esfa
stan
dCr
aig
Rd.(
BRT)
freq
uent
rail-
like
bus
trans
itse
rvic
ebe
twee
nth
ein
ters
ectio
nof
Ran
cho
Dr/R
ainb
owBl
vdan
dN
ellis
Air
Forc
eB
ase.
(inPh
ase
One
,th
isro
ute
will
have
been
impl
emen
ted
asRa
pid
Bus.)
BRT
isa
high
-qua
lity
bus
serv
ice
that
oper
ates
inde
dica
ted
trans
itla
nes
with
enha
nced
stat
ions
and
decr
ease
stra
vel
times
and
spur
sec
onom
icde
velo
pmen
t.If
new
trans
itm
odes
orte
chno
logi
esbe
com
eav
aila
ble
befo
reim
plem
enta
tion,
allas
pect
sof
the
new
tech
nolo
gywi
llbe
eval
uate
d.
Phas
eTw
o:D
evel
opEa
ster
nA
ve.
BRT
infr
astru
ctur
eth
atpr
ovid
esfa
stan
dEa
ster
nA
ve.
(BRT
)fr
eque
ntra
il-lik
ebu
stra
nsit
serv
ice
betw
een
the
inte
rsec
tion
ofS.
Eas
tern
Ave
./W.
Hor
izon
Rid
gePk
wy.
and
Civi
cC
ente
rD
r/Las
Veg
asBl
vdN.
(InPh
ase
One
,the
sout
hern
porti
onof
this
rout
ewi
llha
vebe
enim
plem
ente
das
Rapi
dBu
s.)BR
Tis
ahi
gh-q
ualit
ybu
sse
rvic
eth
atop
erat
esin
dedi
cate
dtra
nsit
lane
swi
then
hanc
edst
atio
nsan
dde
crea
ses
trave
ltim
esan
dsp
urs
econ
omic
deve
lopm
ent.
Iine
wtra
nsit
mod
esor
tech
nolo
gies
beco
me
avai
labl
ebe
fore
impl
emen
tatio
n,all
aspe
cts
ofth
ene
wte
chno
logy
will
beev
alua
ted.
Phas
eTw
o:Pr
ovid
eRa
pid
Bus
serv
ice
onJo
nes
Blv
d/R
ainb
owBl
vd.,
6Ra
pid
Bus
Rou
tes
Trop
ican
aA
ve.,
Nor
thM
artin
Luth
erKi
ng,J
r.Bl
vd.,
Nelli
s(J
ones
/Rai
nbow
,B
lvd/
Step
hani
eSt
.(e
xten
sion
toCi
tyof
Hen
ders
on);
Las
Veg
asTr
opic
ana,
MLK
,Bl
vd.
Nor
th,
and
Las
Veg
asBl
vd.S
outh
.Ra
pid
Bus
typi
cally
Nel
lis/S
teph
anie
,do
esno
tope
rate
inde
dica
ted
trans
itla
nes,
ordo
esso
only
inN
orth
Las
Veg
aslim
ited
area
s.In
clud
esta
rget
edm
easu
res
tom
ake
trans
ittri
psBI
vd,
Sout
hLa
squ
icke
rto
acce
ssde
stin
atio
ns.
Veg
asBl
vd)
Impl
emen
tFr
eque
ntA
sth
eH
igh
Cap
acity
Tran
sit
netw
ork
isbu
iltou
t,im
plem
ent
aSe
rvic
eA
long
Iden
tifie
dFr
eque
ntTr
ansi
tN
etw
ork
byin
crea
sing
serv
ice
freq
uenc
ies
inHO
TR
oute
sfu
ture
HOT
corr
idor
s.Pr
ovid
esse
rvic
eev
ery
15m
inut
esor
less
onth
ebu
sies
tro
utes
.
Build
Hig
hC
apac
ityTr
ansi
tSys
tem
Proj
ect
Des
crip
tion
Fini
shM
aryl
and
Park
way
HCT
Proj
ect
Phas
eO
ne:
Cha
rlest
on(L
RTor
BRT)
Phas
eO
ne:
Cro
ss-V
alle
yC
onne
ctor
(BR
Tor
LRT)
[Bou
lder
Hig
hway
-Fla
min
goD
ecat
ur]
Phas
eO
ne:
Nor
th5t
hSt
.(B
RTor
LRT)
On
Bo
ard
Rec
om
men
dat
ion
s1
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS:
Sum
mar
yD
escr
ipti
ons
ofIm
ple
men
tin
gP
roje
cts
Proj
ect
Des
crip
tion
Build
Hig
hC
apac
ityTr
ansi
tSys
tem
Dev
elop
New
Rev
enue
Partn
erwi
thlo
calg
over
nmen
tsan
dth
epr
ivat
ese
ctor
toSo
urce
usin
gPu
blic
-de
velo
ptra
nsit-
focu
sed
resi
dent
ial
optio
nsan
dco
mm
erci
alPr
ivat
ePa
rtner
ship
sto
area
sth
atin
crea
serid
ersh
ipan
dge
nera
tene
wre
venu
eto
Build
Tran
sit-O
rient
edop
erat
eth
etra
nsit
syst
em.
Dev
elop
men
ts(T
OD
)A
long
High
Cap
acity
Rou
tes
Dev
elop
Res
ortC
orrid
orD
evel
opEu
rope
anTr
amse
rvic
eto
and
from
McC
arra
nR
ail-B
ased
Tran
sit
Inte
rnat
iona
lA
irpor
t,al
ong
the
Strip
and
into
Dow
ntow
nLa
s(E
uro-
Tram
”)be
twee
nV
egas
Tram
way
sar
erai
lba
sed
and
typi
cally
oper
ate
inD
ownt
own
Las
Veg
asde
dica
ted
lane
sse
para
ted
from
traffi
c,or
insh
ared
lane
swi
than
dM
cCar
ran
IntlA
irpor
tot
her t
raffi
c.Tr
ams
can
carry
twic
eas
man
ypa
ssen
gers
asVi
ath
eSt
rip(L
ong-
term
;st
reet
cars
,an
dwi
llin
crea
serid
ersh
ipsu
bsta
ntia
llym
ore
than
—20
-yea
r)ex
istin
gbu
sse
rvic
e.
On
Boa
rdR
ecom
men
datio
ns2
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS
:S
umm
ary
Des
crip
tion
sof
Imp
lem
enti
ng
Pro
ject
s
Impr
ove
and
Expa
ndTr
ansi
tAcc
ess
and
Serv
ice
Qua
lity:
Impl
emen
tFr
eque
ncy
and
Ope
ratin
gH
ours
Impr
ovem
ents
onEx
istin
aSe
rvic
e
Tra
nsit
inSu
burb
anA
reas
Pilo
t/Dev
elop
New
Serv
ice
Mod
els
for
Low
Den
sity
orLo
wD
eman
dA
reas
:M
icro
-Circ
ulat
orZo
nes
with
Subu
rban
Expr
ess
Con
nect
ors
toHi
ghFr
eque
ncy
Serv
ice
orM
ajor
Tran
sit
Hub
sPi
lot/D
evel
opN
ewSe
rvic
eM
odel
sfo
rLo
wD
ensit
yor
Low
Dem
and
Are
as: Rid
esha
rePa
rtner
ship
sfo
rN
on-S
ubur
ban
Firs
tM
ile/L
ast M
ileSe
rvic
esD
evel
opSe
rvic
eBu
y-U
pO
ptio
ns
Tran
sits
ervi
ceco
nsis
tsof
two
fund
amen
tal
elem
ents
:fr
eque
ncy
(how
ofte
nth
ese
rvic
eop
erat
es)
and
serv
ice
span
(how
long
serv
ice
runs
),C
ombi
ned,
thes
etw
ofa
ctor
sin
fluen
ceho
wco
nven
ient
and
attra
ctiv
etra
nsit
is.In
crea
sing
freq
uenc
yan
dse
rvic
esp
anbe
tter
acco
mm
odat
esa
broa
der
cros
s-se
ctio
nof
the
popu
latio
n,in
clud
ing
shift
wor
kers
who
wor
kou
tsid
eth
etra
ditio
nal
9am
-5p
mw
ork
day.
Prov
ide
serv
ice
alon
gsh
ort
rout
esin
defin
edar
eas
usin
gsm
all
vans
orbu
ses.
The
sero
utes
wou
ldco
nnec
tto
hubs
that
are
then
serv
edby
expr
ess
bus,
High
Cap
acity
Tran
sit, o
rfre
quen
tbu
sse
rvic
e.Th
ero
utes
coul
dm
ake
min
orro
ute
devi
atio
nsto
impr
ove
serv
ice,
and
fare
sw
ould
bein
tegr
ated
with
RTC
trans
it.
Dev
elop
rides
hare
partn
ersh
ips
that
prov
ide
asu
bsid
yfo
rre
side
nts,
visit
ors,
orem
ploy
ees
that
can
prov
ide
first
mile
/last
mile
conn
ectio
nsbe
twee
ntra
nsit
serv
ices
and
activ
ityce
nter
sor
empl
oym
ent
area
s.R
ides
hare
partn
ersh
ips
can
also
serv
eas
am
obili
tyal
tern
ativ
efo
rADA
para
trans
itcu
stom
ers,
late
nigh
tco
mm
utin
gse
rvic
es,
orfo
rgua
rant
eed
ride
hom
epr
ogra
ms
that
prov
ide
serv
ice
whe
ntra
nsit
isno
tope
ratin
g.
Dev
elop
apr
ogra
mto
prov
ide
addi
tiona
ltra
nsit
serv
ice
beyo
ndw
hatc
ould
othe
rwis
ebe
prov
ided
byen
ablin
glo
cal
gove
rnm
ents
,bu
sine
sses
,an
dot
here
ntiti
esto
dire
ctly
fund
spec
ific
trans
itse
rvic
eim
prov
emen
ts.
Expan
dT
rans
itto
Max
imiz
eA
cces
sto
Job
san
dH
ousi
ng
Pro
ject
sth
at
Imp
lem
ent
this
Str
ateg
yT
hefo
llow
ing
10pro
ject
sim
ple
men
tth
isst
rate
gy
.C
ompl
ete
pro
ject
orpr
ogra
m-l
evel
plan
ning
will
beco
mp
lete
das
each
pro
ject
isfu
llydev
eloped
,
how
ever
addit
ional
info
rmat
ion
about
tim
elin
es,
agen
cies
,lo
cati
ons,
and
cost
s
isunder
dev
elo
pm
ent
and
will
beco
mp
lete
dpr
ior
tofi
nal
ado
pti
on
ofth
eO
n
Boa
rdP
lan.
Proj
ect
Des
crip
tion
Proj
ect
Des
crip
tion
Pilo
t/Dev
elop
New
Dev
elop
rides
hare
partn
ersh
ips
that
prov
ide
asu
bsid
yto
Serv
ice
Mod
els
for
Low
resi
dent
s,pr
imar
ilyus
ing
Ube
ran
dLy
ft,th
atpr
ovid
eac
cess
toD
ensit
yor
Low
Dem
and
the
near
est
RTC
trans
itst
op(H
igh
Cap
acity
Tran
sit,
High
Are
as:
Freq
uenc
yN
etw
ork,
orlo
cal
bus
serv
ice)
inlie
uof
low
freq
uenc
yR
ides
hare
buse
sw
here
cust
omer
sw
ould
othe
rwis
eha
veto
wal
klo
ngPa
rtner
ship
sFi
rst
dist
ance
sto
acce
ssa
trans
itst
op.
Mile
/Las
tMile
Con
nect
ions
to
EXPA
NDTR
ANSI
TSE
RVIC
ETO
MAX
IMIZ
EA
CCES
STO
JOB
SAN
DHO
USIN
GIm
plem
ent
Prog
ram
toC
ompl
ete
seto
fRTC
-iden
tifie
dbu
sse
rvic
eim
prov
emen
ts,
Fill
Iden
tifie
dC
urre
ntin
clud
ing
new
bus
rout
esan
dex
tens
ions
ofex
istin
gro
utes
into
Tran
sitS
ervi
ceN
eeds
new
area
sex
perie
ncin
gra
pid
popu
latio
ngr
owth
,in
crea
sed
freq
uenc
yon
high
rider
ship
rout
es,
and
othe
rse
rvic
eim
prov
emen
tsan
den
hanc
emen
ts.
Impr
ove
and
Expa
ndW
orki
ngwi
thtra
nsit
user
s,th
epu
blic
,st
akeh
olde
rs,
and
loca
lTr
ansi
t Acc
ess
and
agen
cies
,th
eRT
Cwi
llde
velo
pcu
rren
tand
targ
eted
long
-term
Serv
ice
Qua
lity:
serv
ice
char
acte
ristic
sfo
rthe
entir
ere
gion
that
mat
ches
Dev
elop
Reg
iona
lne
ighb
orho
od-le
vel
mea
sure
sof
dem
ogra
phic
san
dth
ebu
iltSe
rvic
eG
oals
envi
ronm
ent.
Usin
gth
isin
form
atio
nth
eap
prop
riate
trans
itm
ode
(Spr
ing
2020
)am
ong
bus
serv
ice,
high
freq
uenc
ybu
ses,
expr
ess/
com
mut
erse
rvic
es,
and
new
mod
eslik
erid
esha
repa
rtner
ship
san
dm
icro
-ci
rcul
ator
serv
ices
.A
bout
75pe
rcen
toft
here
gion
’spo
pula
tion
isw
ithin
4m
ileof
exis
ting
trans
itse
rvic
e.W
ithne
wse
rvic
eta
rget
sfo
rcov
erag
e,fr
eque
ncy,
and
serv
ice
hour
s,10
0pe
rcen
tof
the
valle
yw
ould
have
near
byac
cess
totra
nsit
asth
eRT
Cha
sre
sour
ces
toex
tend
and
impr
ove
serv
ice
toel
imin
ate
serv
ice
gaps
and
mee
tta
rget
s.Im
prov
ean
dEx
pand
As
the
High
Cap
acity
Tran
sitn
etw
ork
isbu
ilt-o
ut, a
Freq
uent
Tran
sit A
cces
san
dTr
ansi
tNet
wor
kw
ould
bede
velo
ped
byin
crea
sing
serv
ice
Serv
ice
Qua
lity:
freq
uenc
ies
infu
ture
HCT
corr
idor
s,pl
uspr
ovid
ing
freq
uent
Expa
ndFr
eque
ntse
rvic
ein
othe
rid
entif
ied
corr
idor
s.Pr
ovid
ese
rvic
eev
ery
15Tr
ansi
tN
etw
ork
inm
inut
esor
less
onth
ebu
sies
tro
utes
.Hi
ghD
eman
dA
reas
On
Bo
ard
Rec
om
men
dat
ion
s3
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS:
Sum
mar
yD
escr
ipti
ons
ofIm
ple
men
tin
gP
roje
cts
Proj
ect
Des
crip
tion
—
Impl
emen
tTra
nsit
Fare
Man
ylo
wer
inco
me
rider
sst
rugg
leto
com
eup
with
the
cost
ofa
Cap
ping
Prog
ram
pass
allat
once
.D
evel
opa
prog
ram
tom
ake
trans
itm
ore
affo
rdab
leby
impl
emen
ting
fare
capp
ing
that
wor
ksby
rew
ardi
ngpa
ssen
gers
with
free
rides
afte
rthe
ym
eet
the
fare
equi
vale
ntof
ada
ily, w
eekl
yor
mon
thly
pass
.Th
isal
low
sfo
rpas
seng
ers
topa
yfo
r one
trans
ittri
pat
atim
e.R
educ
edFa
rePr
ogra
mEx
pand
redu
ced
fare
prog
ram
sfo
rstu
dent
sen
rolle
din
K-12
and
forS
tude
nts
insti
tutio
nsof
high
erle
arni
ngto
assi
stin
low
erin
gth
eir
cost
todd
etra
nsit.
On
Boa
rdR
ecom
men
dat
ions
4
ON
BO
AR
DD
RAFT
PLA
NR
ECO
MM
END
ATI
ON
S:S
umm
ary
Des
crip
tion
sof
Impl
emen
ting
Pro
ject
s
Proj
ect
Des
crip
tion
MAK
EAL
LTR
AVEL
OPT
ION
SSA
FER
AND
MOR
ESE
CURE
Traf
ficC
rash
Revi
ewPr
ovid
eve
hicl
ecr
ash
hots
pot
repo
rts
for
the
regi
onan
dfo
rea
chan
dC
ount
erm
easu
res
spec
ific
loca
tion
afte
ra
fata
lau
tom
obile
cras
hha
soc
curr
ed.
Prog
ram
Impl
emen
teng
inee
ring
impr
ovem
ents
whe
nne
eds
are
iden
tifie
d.Bu
sSt
opSa
fety
&M
ove
mor
ebu
sst
ops
back
from
fast
mov
ing
traffi
c,ad
dSe
curit
ypr
otec
tive
bolla
rds
and
light
ing
atbu
sst
ops,
cons
truct
mid
-blo
ckIm
prov
emen
ts:
stre
etcr
ossi
ngs,
incr
ease
trans
itse
curit
ypr
esen
ce,
add
vide
oA
ccel
erat
eEf
forts
mon
itorin
g,an
din
stall
“blu
elig
ht”em
erge
ncy
call
boxe
sat
high
erto
Mov
eBu
sSt
ops
risk
bus
stop
s.Ba
ckfro
mFa
stM
ovin
gTr
affic
Bus
Stop
Safe
ty&
Insta
llsh
ort
and
robu
stm
etal
post
sca
lled
bolla
rds
arou
ndbu
sSe
curit
yIm
prov
emen
ts:
stop
sth
atwi
llpr
even
tau
tom
obile
sle
avin
gth
ero
adw
ayfro
mIn
stall
Bolla
rds
athi
tting
wai
ting
trans
itpa
ssen
gers
.Bo
llard
spr
otec
ttra
nsit
rider
sH
igh-
Vol
ume
Stop
sfro
mve
hicl
esbe
caus
em
any
bus
stop
sar
elo
cate
dal
ong
high
-wi
thFa
stM
ovin
gsp
eed
arte
rials
with
narr
owsi
dew
alks
,re
quiri
ngpl
acem
entc
lose
Traf
ficto
the
curb
.Bu
sSt
opSa
fety
&In
stall
prom
inen
t cal
lbo
xes
that
allo
wth
ege
nera
lpu
blic
and
Secu
rity
Impr
ovem
ents
:tra
nsit
pass
enge
rsin
stan
tand
dire
ctco
mm
unic
atio
nto
trans
itIn
stall
Emer
genc
yse
curit
yof
ficia
lsw
hen
need
ed.
Blue
Ligh
tCall
Box
esat
High
Risk
Stop
Loca
tions
Build
trans
itst
ops
tom
itiga
teda
mag
efro
mva
ndal
ism
,re
duce
loite
ring,
and
less
enth
eop
portu
nity
fora
ssau
lts.
Crim
ePr
even
tion
Thro
ugh
Envi
ronm
enta
lD
esig
nis
ase
tof
desi
gnpr
inci
ples
used
todi
scou
rage
crim
ean
dpr
omot
etra
nsit
secu
rity.
On-
Bus
Secu
rity
Dep
loy
anin
crea
sed
trans
itse
curit
ypr
esen
ceon
RTC
vehi
cles
toEn
hanc
emen
ts&
supp
lem
entt
hedr
iver
and
live
cam
eras
curre
ntly
inst
alle
don
allPr
esen
cebu
ses.
On-
Bus
Secu
rity
Incr
ease
awar
enes
sof
the
RTC
onlin
em
obile
app
desi
gned
toE
nhan
cem
ents
&pr
omot
etra
nsit
secu
rity
and
com
mun
icat
edi
rect
lyto
secu
rity
Pres
ence
:Ex
pand
offic
ials
whe
nne
eded
.Tr
ansi
tWat
chPr
ogra
m
On-
Bus
Secu
rity
Inst
itute
ara
nge
actio
nsto
redu
cean
dm
itiga
tecr
imin
alac
tivity
.E
nhan
cem
ents
&Pr
ovid
eco
mpr
ehen
sive
train
ing
fort
rans
itse
curit
yen
forc
emen
tPr
esen
ce:
pers
onne
lan
dde
ploy
de-e
scal
atio
nte
ams
tohe
lpan
yone
who
Revi
ewCr
imin
alm
ight
bein
dist
ress
.C
odes
toE
nsur
eA
ppro
pria
teTr
eatm
ento
fTra
nsit-
Rel
ated
Crim
inal
Act
ivity
Dev
elop
Tech
nolo
gy-
Dep
loy
real
-tim
ese
curit
ym
onito
ring
syst
ems
atbu
sst
ops
that
Bas
edA
ctiv
eSe
curit
yha
rnes
sbi
gda
taan
dpr
edic
tive
anal
ytic
sto
prep
are
and
Mon
itorin
gat
Bus
Stop
spr
epos
ition
secu
rity
reso
urce
s.Th
isca
nhe
lpm
itiga
tein
cide
nts
(Fut
ure
Tech
)be
fore
they
occu
r,an
den
sure
stra
nsit
secu
rity
isab
leto
resp
ond
quic
kly
whe
nth
eydo
occu
r.
Proj
ect
Des
crip
tion
Mak
eA
llT
rave
lO
pti
ons
Saf
eran
dM
ore
Sec
ure
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g9
pro
ject
sim
ple
men
tth
isst
rate
gy
.C
ompl
ete
pro
ject
or
prog
ram
-lev
elpl
anni
ngw
illbe
com
ple
ted
asea
chpro
ject
isfu
llydev
eloped
,
how
ever
addi
tion
alin
form
atio
nab
out
tim
elin
es,
agen
cies
,lo
cati
ons,
and
cost
s
isunder
dev
elo
pm
ent
and
will
beco
mp
lete
dpr
ior
tofi
nal
ado
pti
on
ofth
eO
n
Boa
rdP
lan.
Bus
Stop
Safe
ty&
Secu
rity
Impr
ovem
ents
:U
tiliz
eEs
tabl
ishe
d“C
rime
Prev
entio
nTh
roug
hEn
viro
nmen
tal
Des
ign
(CPT
ED)”
Stra
tegi
esD
urin
gD
esig
nof
Tran
sit
Faci
litie
s
On
Boa
rdR
ecom
men
dati
ons
5
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS:
Sum
mar
yD
escr
ipti
ons
ofIm
ple
men
tin
gP
roje
cts
Mak
eS
hort
Tri
psE
asie
r
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g7
pro
ject
sim
ple
men
tth
isst
rate
gy.
Com
plet
epro
ject
or
prog
ram
-lev
elpl
anni
ngw
illbe
com
ple
ted
asea
chpro
ject
isfu
llydev
eloped
,
how
ever
addi
tion
alin
form
atio
nab
ou
tti
mel
ines
,ag
enci
es,
loca
tion
s,an
dco
sts
isunder
dev
elo
pm
ent
and
will
beco
mple
ted
prio
rto
fina
lad
op
tio
nof
the
On
Boa
rdP
lan.
Proj
ect
Des
crip
tion
Impr
ove
Way
findi
ngin
High
Vol
ume
Pede
stria
nLo
catio
ns
Insta
llco
mpe
lling
and
dyna
mic
sign
age,
mes
sage
boar
ds,
and
inte
ract
ive
map
sat
trans
itst
ops
and
insi
detra
nsit
vehi
cles
,an
din
high
-vol
ume
pede
stria
nar
eas
that
prov
ide
live
upda
tes
and
assi
sts
rider
san
dvi
sitor
sin
succ
essf
ully
acce
ssin
gth
eir
dest
inat
ion.
Proj
ect
Des
crip
tion
MAK
ESH
ORT
WAL
KING
TRIP
SEA
SIER
Impl
emen
tCom
plet
eEs
tabl
ish
ane
wfu
ndin
gpr
ogra
mth
atwi
llfo
llow
the
high
est
Stre
ets
Prog
ram
desi
gnna
tiona
lde
sign
stan
dard
sto
cons
truct
infr
astru
ctur
ean
dam
eniti
esto
stre
ets
that
prov
ide
safe
wal
king
and
bicy
clin
gfa
cilit
ies,
supp
ort
the
safe
and
effic
ient
oper
atio
nof
trans
it,an
dpr
iorit
ize
mov
ing
peop
leof
allag
esan
dab
ilitie
s.
Wal
kabi
lity
Infr
astru
ctur
eIn
stall
mor
ecr
ossw
alks
,si
dew
alks
,bik
ela
nes,
and
pede
stria
nlan
dEd
ucat
ion
Prog
ram
bicy
clist
safe
tyim
prov
emen
tsin
neig
hbor
hood
s,ne
artra
nsit
stop
s,an
dar
ound
shop
ping
and
com
mer
cial
area
s.
Impr
ove
Am
eniti
esat
Prov
ide
mor
epe
dest
rian
amen
ities
that
coul
din
clud
ead
ditio
nal
Bus
Stop
slig
htin
g,se
atin
g,hi
ghqu
ality
shel
ters
,la
ndsc
apin
g,sh
ade,
etc.
,fo
rtra
nsit
rider
sat
trans
itst
ops
and
othe
rke
ylo
catio
ns.
Cro
ssw
alk
Prov
ide
safe
and
cons
iste
ntlo
catio
nsfo
rmid
-blo
ckcr
ossi
ngfo
rIm
prov
emen
tsfo
rpe
ople
thro
ugho
utall
stre
ets
inSo
uthe
rnN
evad
ato
incr
ease
Maj
orCo
rrido
rs:
pede
stria
nan
dau
tom
obile
safe
ty.
Impr
ovem
ents
will
beD
evel
opM
id-B
lock
impl
emen
ted
inpa
ckag
esat
mul
tiple
loca
tions
alon
gin
divi
dual
Pede
stria
nco
rrido
rs.
Cro
ssin
gsAt
Long
Bloc
kSe
gmen
tsA
ndHi
ghTr
affic
Vol
umes
Dev
elop
Reg
iona
lC
reat
ere
gion
alm
obili
tyhu
bswi
then
hanc
edam
eniti
esw
here
Mob
ility
Hub
sm
any
trans
porta
tion
serv
ices
conn
ect,
incl
udin
gpo
tent
ially
high
capa
city
trans
it,fr
eque
nttra
nsit,
expr
ess
rout
es,
park
and
rides
,rid
esha
rese
rvic
estU
ber
and
Lyft)
,bi
kesh
are,
and
scoo
ters
hare
.
Dev
elop
Nei
ghbo
rhoo
dC
reat
ene
ighb
orho
odm
obili
tyhu
bsth
atfu
nctio
nat
asm
alle
rM
obili
tyH
ubs
scal
eth
anre
gion
alm
obili
tyhu
bswi
then
hanc
edam
eniti
esw
here
man
ytra
nspo
rtatio
nse
rvic
esco
nnec
t,in
clud
ing
pote
ntia
llyhi
ghca
paci
tytra
nsit,
freq
uent
trans
it,ex
pres
sro
utes
,pa
rkan
drid
es,
rides
hare
serv
ices
tUbe
ran
dLy
ft),b
ikes
hare
,an
dsc
oote
rsha
re.
On
Boa
rdR
ecom
men
dat
ions
6
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS:
Sum
mar
yD
escr
ipti
ons
ofIm
ple
men
tin
gP
roje
cts
Bg
Mo
ve
#5:
Expan
dS
erv
ice
for
Sen
iors
,V
eter
ans,
and
Peo
ple
wit
hD
isab
ilit
ies
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g6
pro
ject
sim
ple
men
tth
isst
rate
gy
.C
ompl
ete
pro
ject
or
prog
ram
-lev
elpl
anni
ngw
illbe
com
ple
ted
asea
chpro
ject
isfu
llydev
eloped
,
how
ever
addi
tion
alin
form
atio
nab
out
tim
elin
es,
agen
cies
,lo
cati
ons,
and
cost
s
isunder
dev
elo
pm
ent
and
will
beco
mp
lete
dpr
ior
tofi
nal
ado
pti
on
ofth
eO
n
Boa
rdP
lan.
Proj
ect
Des
crip
tion
Prov
ide
App
-Bas
edV
ehic
leTr
acki
ngfo
rD
edic
ated
Serv
ices
Dev
elop
and
prov
ide
real
-tim
eve
hicl
etra
ckin
gin
form
atio
nvi
ath
ein
tern
etan
dsm
artp
hone
apps
with
arriv
alin
form
atio
nso
user
skn
oww
hen
tobe
read
yfo
rpi
ck-u
p.Te
chno
logy
inve
stm
ents
impr
ove
the
qual
ityof
serv
ice
and
mak
eit
easi
erfo
rpe
ople
tous
e.
Proj
ect
Des
crip
tion
EXPA
NDDE
DICA
TED
SERV
ICE
FOR
SEN
IORS
,VET
ERA
NS
AND
PEO
PLE
WIT
HDI
SABI
LITI
ESD
oubl
eSi
lver
STA
RD
oubl
eth
enu
mbe
rof
Silv
erST
AR
rout
es,w
hich
prov
ide
Serv
ice
for
Seni
ors
conn
ectio
nsfro
mse
nior
hous
ing
tosh
oppi
ngce
nter
san
dth
eRT
Ctra
nsit
netw
ork.
The
RTC
curr
ently
oper
ates
12pa
rt-tim
eSi
lver
STA
Rro
utes
thro
ugho
utSo
uthe
rnN
evad
a.
Dou
ble
Flex
ible
Dem
and
Dou
ble
RTC’
sFl
exib
leD
eman
dR
espo
nse
(FD
R)se
rvic
ew
hich
Res
pons
e(F
DR)
Serv
ice
prov
ides
door
-to-d
oors
peci
aliz
edtra
nspo
rtatio
nfo
rsen
iors
and
forS
enio
rsre
side
nts
inar
eas
whe
reRT
Ctra
nsit
islim
ited.
Enha
nce
the
prog
ram
and
incr
ease
the
avai
labi
lity
ofse
rvic
eto
mor
ear
eas
ofSo
uthe
rnN
evad
a.
Dou
ble
Serv
ice
for
Dou
ble
the
amou
ntof
serv
ice
dedi
cate
dto
the
Vet
eran
sM
edic
alV
eter
ans
Tran
spor
tatio
nN
etw
ork
for
Seni
or&
Dis
able
dV
eter
ans
that
prov
ides
trans
porta
tion
forv
eter
ans
and
thei
rdep
ende
nts
toan
dfro
mm
edic
alap
poin
tmen
ts,
such
asat
U.S
.D
epar
tmen
tof
Vet
eran
sA
ffairs
(VA)
clin
ics,
prim
ary
care
phys
icia
ns,
and
the
Vet
eran
sM
edic
alC
ente
r.Pr
ovid
eFu
llR
egio
nal
Prov
ide
para
trans
itse
rvic
efo
rpe
ople
with
disa
bilit
ies
toth
eC
over
age
for
Peop
lewi
then
tire
urba
nize
dar
eaof
Sout
hern
Nev
ada;
beyo
ndth
ecu
rren
tD
isabi
litie
s(P
arat
rans
it)ar
ealim
ited
tow
ithin
3/4-
mile
ofan
RTC
trans
itro
ute)
.
Prov
ide
App
-Bas
edD
evel
opa
plat
form
tom
ake
spec
ializ
edtra
nsit
serv
ices
easi
erto
Res
erva
tions
and
Fare
use
bym
akin
git
seam
less
topl
an,
book
and
pay
fort
rips.
Cre
ate
Paym
entf
orD
edic
ated
anap
p-ba
sed
rese
rvat
ion
and
fare
paym
ents
yste
msim
ilar t
oSe
rvic
esth
ose
used
byU
ber,
Lyft,
and
RTC’
sTr
ipto
Strip
serv
ice
for
dem
and
resp
onse
serv
ices
.
On
Boa
rdR
eco
mm
end
atio
ns
7
ON
BOA
RDDR
AFT
PLAN
RECO
MM
END
ATI
ON
S:Su
mm
ary
Des
crip
tions
ofIm
plem
entin
gPr
ojec
ts
Impr
ove
Airp
ortS
ervi
cean
dC
onne
ctio
ns:
Dev
elop
Airp
ort
Mob
ility
Hub
(TIB
P:M
cCar
ran
Mul
timod
alTr
ansp
orta
tion
Cen
ter)
Impr
ove
Airp
ort
Serv
ice
and
Con
nect
ions
:Se
rve
Both
Term
inal
sW
ithAl
lAirp
ort
Con
nect
ions
Impr
ove
Airp
ortS
ervi
cean
dC
onne
ctio
ns:
Impr
ove
Tran
sit-
Rel
ated
Way
findi
ngan
dO
nsite
Info
rmat
ion
Impr
ove
Com
mut
erFa
cilit
ies
&Se
rvic
es:
Dev
elop
Park
and
Ride
Lots
w/Ex
pres
sSe
rvic
eC
onne
ctio
nsto
Maj
orD
estin
atio
ns
Impl
emen
tnew
expr
ess
rout
esto
the
Res
ort
Corri
dor
that
mim
icex
istin
gex
pres
sro
utes
toD
ownt
own
Las
Veg
as.
Expr
ess
buse
sar
ede
sign
edto
prov
ide
fast
,lim
ited
stop
serv
ice
tom
ajor
activ
ityan
djo
bce
nter
san
dty
pica
llyse
rve
park
-and
-rid
elo
tsor
mob
ility
hubs
,an
dof
ten
only
oper
ate
durin
gpe
akco
mm
utin
gho
urs.
In20
40,t
hela
rges
tnu
mbe
rof
wor
ktri
pswi
llbe
mad
eto
the
Res
ort
Corri
dorf
rom
outly
ing
resi
dent
ial
area
s,an
dwi
llre
quire
two
bus
trans
fers
ifm
ade
via
the
tradi
tiona
ltra
nsit
grid
netw
ork.
New
expr
ess
rout
eswi
llpr
ovid
eon
ese
atse
rvic
efro
mou
tlyin
gar
eas
tom
ajor
activ
ityce
nter
s.Th
e20
16Tr
ansp
orta
tion
Inve
stm
ent
Bus
ines
sPl
anid
entif
ied
pote
ntia
lne
wex
pres
sro
utes
toth
eR
esor
tCor
eal
ong
Blue
Dia
mon
dR
oad,
Sout
hLa
sV
egas
Blvd
,an
dal
ong
l-215
!CC-
215.
On
Boar
dha
sid
entif
ied
addi
tiona
lex
pres
sro
ute
oppo
rtuni
ties
from
area
sno
rthan
dea
stof
the
Res
ort
Corri
dor
and
Dow
ntow
nar
eas,
Dev
elop
prog
ram
san
din
fras
truct
ure
that
conn
ects
com
mut
ers
tohi
ghqu
ality
trans
itan
dm
obili
tyal
tern
ativ
esth
atal
low
them
toqu
ickl
yan
dre
liabl
ytra
vel
to/fr
omw
ork.
Loca
ting
park
-and
-rid
efa
cilit
ies
indi
stan
tre
side
ntia
llo
catio
ns—
pote
ntia
llywi
thpr
ivat
ede
velo
pmen
tpa
rtner
ship
s—
incr
ease
stra
nsit
usag
ean
dhe
lps
man
age
high
traffi
cvo
lum
es.
Faci
litie
san
dse
rvic
esm
ayin
clud
e:pa
rk-a
nd-r
ide
lots,
ince
ntiv
epr
ogra
ms.
map
s,w
ebpa
ges.
and
expr
ess
trans
itse
rvic
esth
atop
erat
edi
rect
lyto
and
from
empl
oym
entc
ente
rs,
with
shor
twai
tsan
dea
syac
cess
toem
ploy
eeen
tranc
es.
The
2016
Tran
spor
tatio
nIn
vest
men
tB
usin
ess
Plan
iden
tifie
dpo
tent
ial
new
Park
and
Ride
lotlo
catio
nsac
ross
the
regi
onth
atw
ould
conn
ect
tone
wex
pres
sro
utes
;O
nBo
ard
cont
inue
sth
ose
and
iden
tifie
sad
ditio
nal
loca
tions
north
and
east
ofth
eR
esor
tCo
rrido
ran
dD
ownt
own
area
.
CV
?
Impro
ve
Co
nn
ecti
on
sto
Maj
orD
esti
nat
ion
s
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g7
pro
ject
sim
ple
men
tth
isst
rate
gy.
Com
plet
epro
ject
or
prog
ram
-lev
elpl
anni
ngw
illbe
com
ple
ted
asea
chpro
ject
isfu
llydev
eloped
,
how
ever
addi
tion
alin
form
atio
nab
ou
tti
mel
ines
,ag
enci
es,
loca
tion
s,an
dco
sts
isu
nd
erd
evel
op
men
tan
dw
illbe
com
ple
ted
prio
rto
fina
lad
opti
on
ofth
eO
n
Boa
rdP
lan.
Impl
emen
tExp
ress
Rou
tes
toR
esor
tCo
rrido
ror
Dow
ntow
n
Proj
ect
Des
crip
tion
Proj
ect
Des
crip
tion
IMPR
OVE
REGI
ONAL
CON
NEC
TIO
NS
TOM
AJO
RDE
STIN
ATIO
NSIm
prov
eA
irpor
tSer
vice
Rer
oute
and
exte
ndth
ecu
rren
tStri
p&
Dow
ntow
nEx
pres
s(S
DX)
and
Con
nect
ions
:bu
sro
ute
topr
ovid
ese
rvic
eto
McC
arra
nIn
tern
atio
nalA
irpor
t.Ex
tend
SDX
The
SDX
curr
ently
has
rela
tivel
yhi
ghrid
ersh
ipan
dpr
ovid
esR
oute
toA
irpor
tse
rvic
ein
the
Res
ort
Corri
dora
ndth
roug
hout
Dow
ntow
nLa
sV
egas
insp
ecia
llybr
ande
dtra
nsit
vehi
cles
.D
evel
opan
dpr
ovid
etra
nsit
serv
ice
toa
prop
osed
McC
arra
nM
ultim
odal
Tran
spor
tatio
nH
ubas
iden
tifie
din
the
2016
Tran
spor
tatio
nIn
vest
men
tB
usin
ess
Plan
(TIB
P).T
hefu
ture
trans
porta
tion
hub
will
beco
nnec
ted
toTe
rmin
als
1an
d3
via
ape
ople
mov
erto
prov
ide
am
ultim
odal
term
inal
stat
ion
for
pote
ntia
lrai
l,lo
cal
buse
s,bu
sra
pid
trans
it,ta
xis,
limos
,and
shut
tles
serv
ing
the
Res
ort
Corri
dor.
The
hub
addr
esse
sth
eph
ysic
alcu
rbsp
ace
cons
train
tsat
McC
arra
nIn
tern
atio
nal
Airp
ort
that
limit
the
abili
tyto
add
high
capa
city
trans
itco
nnec
tions
,whi
lepr
ovid
ing
anef
ficie
ntw
ayfo
rtra
vele
rsto
easi
lyac
cess
mul
tiple
trans
porta
tion
optio
ns.
Prov
ide
trans
itse
rvic
eto
both
Term
inal
1an
d3
onro
utes
that
serv
eM
cCar
ran
Inte
rnat
iona
lA
irpor
t.
Prov
ide
Gam
eD
ayan
dPr
ovid
ega
me
day/
even
tex
pres
stra
nsit
serv
ices
from
mor
eM
ajor
Even
tShu
ttles
area
sof
Sout
hern
Nev
ada
and
tom
ore
maj
orev
ents
,Th
eRT
Ccu
rrent
lypr
ovid
esex
pres
sse
rvic
eto
Veg
asG
olde
nK
nigh
tsga
mes
and
even
tsat
the
Las
Veg
asM
otor
Spee
dway
,an
dfu
ture
even
tsat
Alle
gian
tSta
dium
.
Enha
nce
the
trave
lex
perie
nce
and
ease
inna
viga
ting
the
trans
porta
tion
syst
emat
the
airp
ort.
Dev
elop
enha
nced
bus
stop
faci
litie
s,w
ayfin
ding
sign
san
dm
aps,
and
prov
ide
real
time
trans
itin
form
atio
nvi
adi
gita
lscr
eens
that
disp
lay
depa
rture
and
arriv
altim
esof
conn
ectin
ggr
ound
trans
porta
tion
mod
es.
Prov
ide
onsi
tein
form
atio
nfo
rho
wto
use
the
trans
itsy
stem
,an
dpa
ytra
nsit
fare
swi
tha
mob
ilesm
artp
hone
app.
On
Boa
rdR
ecom
men
datio
ns8
ON
BOA
RDD
RAFT
PLAN
REC
OM
MEN
DA
TIO
NS:
Sum
mar
yD
escr
iptio
nsof
Impl
emen
ting
Proj
ects
Dev
elop
Mob
ility
Hub
sFo
cuse
don
Res
ort
Corri
dor
&D
ownt
own
Con
nect
ions
Dev
elop
mob
ility
hubs
topr
ovid
ea
foca
lpo
intf
ora
varie
tyof
trans
porta
tion,
incl
udin
gpo
tent
ially
high
capa
city
trans
it,fr
eque
nttra
nsit,
expr
ess
rout
es,
park
and
rides
,rid
esha
rese
rvic
estU
ber
and
Lyft)
,bi
kesh
are,
and
scoo
ters
hare
.R
esor
tCor
ridor
and
Dow
ntow
nM
obili
tyH
ubs
focu
sed
onem
ploy
eeac
cess
tom
ajor
jobs
ites
allo
wfo
rre
liabl
eco
mm
utes
and
quic
kre
turn
acce
ssto
hom
esan
dot
herd
estin
atio
ns.
imple
men
tth
isst
rate
gy.
Inad
dit
ion,
mos
tpr
ojec
tsid
enti
fied
toim
ple
men
tB
ig
Mov
e#6
“Im
prov
eR
egio
nal
Con
nect
ions
toM
ajor
Des
tina
tion
s,”
wou
ldal
so
dire
ctly
support
the
goal
sof
this
stra
teg
y.
Com
plet
epro
ject
orpr
ogra
m-l
evel
plan
ning
will
beco
mple
ted
asea
chpro
ject
isfu
llydev
eloped
,how
ever
addi
tion
alin
form
atio
nab
ou
tti
mel
ines
,ag
enci
es,
loca
tion
s,an
dco
sts
isu
nd
er
dev
elo
pm
ent
and
will
beco
mp
lete
dpr
ior
tofi
nal
ado
pti
on
ofth
eO
nB
oard
Pla
n.
Ope
rate
new
expr
ess
trans
itro
utes
tom
ajor
activ
ityan
djo
bce
nter
sfro
mpa
rk-a
nd-r
ide
lots
orm
obili
tyhu
bsto
impr
ove
acce
ssto
Res
ortC
orrid
orem
ploy
eeen
tranc
es.
Expr
ess
buse
sar
ede
sign
edto
prov
ide
fast
limite
dst
opse
rvic
e,an
dof
ten
only
oper
ate
durin
gpe
aktim
es.T
he20
16Tr
ansp
orta
tion
Inve
stm
ent
Bus
ines
sPl
anid
entif
ied
pote
ntia
lne
wex
pres
sro
utes
toth
eR
esor
tC
ore
alon
gBl
ueD
iam
ond
Roa
d,So
uth
Las
Veg
asBl
vd,
and
alon
gl-2
151C
C-21
5th
atw
ould
prov
ide
this
wor
kfor
ceco
nnec
tion.
On
Boar
dha
sid
entif
ied
addi
tiona
lex
pres
sro
ute
oppo
rtuni
ties
forw
orkf
orce
conn
ectio
nsfro
mar
eas
north
and
east
ofth
eR
esor
tCor
ridor
and
Dow
ntow
nar
eas.
Ope
rate
shut
tles
that
prov
ide
dire
ctac
cess
toem
ploy
eeen
tranc
esfro
mm
obili
tyhu
bs.
Mob
ility
hubs
atth
eno
rthan
dso
uth
ends
ofth
eR
esor
tCo
rrido
rw
ould
bese
rved
byfa
stex
pres
sro
utes
and
Res
ort
Corri
dor
shut
tles.
Pro
vide
Rel
iab
leT
rans
itfo
rR
esor
tC
orri
dor
Em
plo
yee
s
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g4
proj
ects
,w
hich
incl
ude
mul
tipl
eE
xpre
ssS
hutt
leR
oute
s,
Proj
ect
Des
crip
tion
Proj
ect
Des
crip
tion
_____________
PROV
IDE
RELI
ABLE
TRAN
SIT
FOR
RESO
RTCO
RRID
OR
EMPL
OY
EES
Dev
elop
Expr
ess
Shut
tles
toR
esor
tCo
rrido
ror
Dow
ntow
nM
obili
tyH
ubs
Dev
elop
Dire
ctSe
rvic
eSh
uttle
sto
“Bac
kof
Hou
se’
Res
ortC
orrid
orEm
ploy
eeEn
tranc
es:
Con
stru
ctPe
dest
rian
Con
stru
ctpe
dest
rian
conn
ectio
nsfro
mgr
ade-
sepa
rate
dC
onne
ctio
nsfo
rGra
de-
inte
rsec
tions
alon
gFr
ank
Sina
traan
dSa
mm
yD
avis
Jr.
Driv
eson
Sepa
rate
dBa
ckof
the
wes
tsid
eof
the
Strip
toea
seem
ploy
eeac
cess
tow
ork.
Hou
se”
Loca
tions
onW
est
Side
ofSt
rip
On
Boa
rdR
ecom
men
datio
ns9
ON
BO
AR
DD
RA
FTPL
AN
RE
CO
MM
EN
DA
TIO
NS:
Sum
mar
yD
escr
iptio
nsof
Impl
emen
ting
Proj
ects
Lev
erag
eN
ewT
ech
no
log
yto
Impro
ve
Mob
ilit
yan
dS
ust
aina
bili
ty
Pro
ject
sth
atIm
ple
men
tth
isS
trat
egy
The
foll
owin
g10
pro
ject
sim
ple
men
tth
isst
rate
gy.
Com
plet
epro
ject
or
prog
ram
-lev
elpl
anni
ngw
illbe
com
ple
ted
asea
chpro
ject
isfu
llydev
eloped
,
how
ever
addi
tion
alin
form
atio
nab
ou
tti
mel
ines
,ag
enci
es,
loca
tion
s,an
dco
sts
isunder
dev
elo
pm
ent
and
will
beco
mple
ted
prio
rto
fina
lad
op
tio
nof
the
On
Boa
rdP
lan.
Prov
ide
and
effic
ient
and
safe
traffi
csig
nal
netw
ork
byim
plem
entin
gin
nova
tive
and
emer
ging
tech
nolo
gies
rela
ted
tobi
gda
ta,t
raffi
csig
nal
oper
atio
nsan
dpe
rfor
man
ce,
and
mul
timod
altra
ffic
oper
atio
ns.
Shift
toA
uton
omou
sTe
stan
dim
plem
enta
sw
arra
nted
auto
nom
ous
trans
itve
hicl
eTr
ansi
tV
ehic
les
aste
chno
logi
esas
they
are
deve
lope
dan
dpr
oven
safe
,co
st-
Tech
nolo
gyPe
rmits
effe
ctiv
e,an
def
ficie
ntto
max
imiz
ere
gion
albe
nefit
s.(1
0+ye
ars)
Trac
kEm
ergi
ngEn
sure
road
sar
ere
ady
fors
elf-d
rivin
gve
hicl
esth
roug
hTr
ansp
orta
tion
impr
ovem
ents
inpa
vem
entm
arki
ngs,
light
ing,
mai
nten
ance
,an
dTe
chno
logi
esan
dco
mm
unic
atio
nseq
uipm
ent.
Upd
ate
Roa
dD
esig
nsas
Nee
ded
Proj
ect
Des
crip
tion
LEVE
RAGE
NEW
TECH
NO
LOG
YTO
IMPR
OVE
MOB
ILIT
YAN
DSU
STAI
NABI
LITY
Prov
ide
Rea
l-Tim
eD
eplo
ydi
gita
lsig
nsat
trans
itst
ops
that
prov
ide
real
-tim
eIn
form
atio
nat
High
info
rmat
ion
onbu
sar
rival
,exp
ecte
dtra
vel
times
,rid
eral
erts
,an
dV
olum
eTr
ansi
tSto
psbu
stra
nsfe
rin
form
atio
n.Im
prov
ePa
ymen
tPr
ovid
ere
al-ti
me
elec
troni
cup
date
sign
sat
trans
itst
ops,
fare
Opt
ions
&In
form
atio
npa
ymen
twith
mob
ilede
vice
sto
pay
fare
s,an
dde
velo
pa
trip
Shar
ing
plan
ner
that
incl
udes
info
rmat
ion
abou
toth
erco
mpl
emen
tary
serv
ices
such
asrid
esha
re.
Dev
elop
&Im
plem
ent
Del
iver
anin
tegr
ated
sing
lepl
atfo
rmfo
rmul
tiple
trans
porta
tion
“Mob
ility
asa
Serv
ice”
serv
ices
that
prov
ides
info
rmat
ion
and
fare
paym
ent(
orun
lock
ing
prog
ram
and
plat
form
devi
ces
fors
hare
dbi
cycl
esan
dsc
oote
rs).
Dev
elop
Publ
icSo
lar
Prov
ide
are
gion
alel
ectri
cve
hicl
ech
argi
ngne
twor
kfo
rlow
-cos
tC
harg
ing
Net
wor
kpu
blic
use
that
issu
ppor
ted
byth
eus
eof
phot
ovol
taic
sola
rpa
nels
.Sh
iftto
Cle
anTr
ansi
tPu
rcha
seze
roem
issi
onel
ectri
cbu
ses
that
impr
ove
loca
lai
rV
ehic
les
qual
ity,
low
ergr
eenh
ouse
gas
emis
sion
s,an
dre
duce
trans
itve
hicl
eop
erat
ing
cost
s.D
evel
opSo
larC
harg
ing
Con
stru
ctso
lar
char
ging
faci
litie
sfo
rRTC
’spr
opos
edel
ectri
cfo
rRT
CTr
ansi
tbu
ses.
Veh
icle
sEx
pand
Trav
elD
eman
dEx
pand
prog
ram
sto
subs
idiz
etra
nsit
pass
esan
dpr
ovid
eot
her
Man
agem
ent(
TDM
)in
cent
ives
for
non-
driv
ing
toen
cour
age
mor
eor
gani
zatio
nsto
Prog
ram
sim
plem
entc
omm
ute
redu
ctio
npr
ogra
ms.
Proj
ect
Des
crip
tion
Impl
emen
t“FA
STO
S”(R
TCFr
eew
ayan
dA
rteria
lSys
tem
ofTr
ansp
orta
tion
Tech
nolo
gyR
oadm
ap)
On
Boa
rdR
ecom
men
dat
ions
10
Metropolitan Planning Subcommittee
A 1 3
1On Board 4pJn Points
Southern Nevada’s local and regional agencies started a new planning effort toaccommodate and manage the region’s future growth and coming transformations backin 2012. After the Southern Nevada Strong Regional Plan was completed in 2015, theRTC started developing new transportation-related responses to growth.
> Since 2015, we have talked with tens of thousands of Southern Nevadans about theirtop priorities for transportation and mobility.
> The first major program was FRI-2 in 2016, which addressed the top road-relatedpriorities.
On Board addresses the rest of the transportation system and the many remainingmobility needs and priorities.
On Board has been a two-year project with substantial community engagement, dataanalysis, and applied expertise from local and national mobility experts to identifysolutions that would work for Southern Nevada.
> There are EIGHT BIG MOBILITY MOVES we need to make:
o Build High Capacity Transit
o Expand Transit Service to Maximize Access to Jobs and Homes
o Make All Travel Options Safer and More Secure
o Make Short Trips Easier and Safer
o Expand Dedicated Service for Seniors, Veterans, and People with Disabilities
o Improve Resident Connections to Major Destinations
o Provide Reliable Transit for Resort Corridor Employees
o Leverage New Technology to Improve Mobility and Sustainability
Overall, these moves improve quality of life in Southern Nevada and prepare theregion’s transportation system for our expected growth over the next two decades:
o They would make transportation safer, more convenient, and more comfortable.
o They would make the entire transportation system more reliable and providepeople with more choices for travel.
o They would help maximize regional economic competitiveness and improvetransportation sustainability.
Our analysis shows that the cumulative benefits to the region and people would farexceed the investment costs.
> Next we need to figure out how and when to implement and pay for these moves; morespecifically the roughly 50 projects or programs that would implement the moves.
> Over the next few years we also need to monitor emerging technologies andtransportation disruptions, identify “trigger points” for when to make coursecorrections, and keep the plan “future proof” as it is implemented.
November 12, 2019
1
Southern Nevada Strong: Regional Economic Value
Atlas Metropolitan Planning
Subcommittee
November 2019
2
EVA Tool
2
SYSTEMS + NETWORKS
(Access, Connectivity + Resilience)
PEOPLE
(Inclusivity, Talent Development, + Workforce Skills)
PLACE(Growth Capacity
+ Localized Assets)
BUSINESS
(Business Growth,
Productivity, Innovation +
Competitiveness)
Economic Value AtlasPort of Portland Commission Meeting - 6/12/2019
4
Exploring the Future of Our Regional Economy
Charting A New Approach To Land Use +
Planning For The New Economy
How are we using our land today and what do we expect our economy to look like?
How do disruptive economic trends change these expectations?
What can we test now? How can we advance a more strategic approach?
3
5
What’s the role of different areas in the region’s economy?
Workforce and client/customer movement
Supply chains and firm-to-firm relationships
Business climate + local markets
6
Economic Value Atlas
A collaborative project aligning planning and economic development to build agreement on investments to strengthen our regional economy.
http://evatool.oregonmetro.gov/
4
7
EVA Task Force + Technical Work Group
Economic Development: • US Economic Development Admin.• Greater Portland Inc.• Columbia River Economic
Development Council• Portland Business Alliance• Prosper Portland• Technology Association of Oregon
Workforce Development• Work Systems Inc.• Portland Community College
Ports: Portland, Vancouver
Research Institutions: Brookings, PSU
State: • Business Oregon• Oregon Employment Department• Dept. of Land Conservation +
Development
Counties: Clackamas, Washington
Cities: Beaverton, Gresham, Hillsboro, Portland, Tigard
Private Sector: • Backstage Capital• Interworks• Leland Consulting Group• Scale Up Partners
8
Shared Regional Values from Economic Value Atlas
Business: job activity, market connectivity, target industries, and labor access
People: diversity, inclusivity, and job access
Place: developability, livability, affordability, and market activity
5
Opportunities for Southern Nevada Define values1.
2.
3.
New data + performance measuresCohort experience
6
How could we use thisTransit & TOD investments
1.
2.
3.
Regional Project Coordination data
Identifying public investment, incentives
Overview of tool
Case Study A – Light rail expansion
Case Study B – Affordable Housing investment
Case Study C – Economic Development, site selection
Case Studies from Portland
14
27
Case Study C
Proposal for cooperative agreement
Support and commitment from partners
Questions?
What’s next?
1
SNS Opportunity Sites: Plan Review
Southern Nevada Strong Steering Committee
July 2019
Opportunity Sites• Boulder Highway at
Gibson/Broadbent• Downtown North Las Vegas
gateway site• Las Vegas Medical District• Maryland Parkway corridor
2
Big picture overview of last 5 years of planning activity
Individual agency interviews
Determine goals and scope for each site review
Draft project scope and prioritize workflow
Seek stakeholder input
Finalize project scope and deliverables (in progress)
Set expectations, goals & prioritize.
Phase I
5-yr Progress Report
Phase II:Research & data
gathering.
Phase III:Analysis &
recommendation.
Phase IV:Reporting &
deliverables.
5-yr Progress ReportPhase II: Research & data gatheringLiterature review; existing conditions; stakeholder interviews
Phase III: Analysis & recommendationUpdate implementation strategies; review accomplishments, milestones, challenges, & barriers; new research and case studies
Phase IV: Reporting & deliverablesComplete 5-yr Progress Report and all deliverables
• 5-yr Progress Report
• Site Specific Deliverables
• Update of SNS web page and resources
• Identify future projects and actions for SNS and partner agencies
Deliverables:
3
Preliminary review: • Re‐Imagine Boulder Highway street design underway
• Completed Henderson Strong and updating Henderson Development Code and RDA investment strategy
• New development adjacent to the Opportunity Site
Key deliverables: • Support the development of a Request for Redevelopment
Proposal and/or an informational packet for the site
• Support regional coordination around the redesign of Boulder Highway
• Support the City of Henderson (COH) with public outreach for new stakeholder engagement
• Research best practices for supporting public/private partnerships for TOD and developing neighborhood centers
Boulder Highway at Gibson/Broadbent
Downtown North Las VegasPreliminary review:
• Key planning studies and strategies
• Significant public investment and land acquisition
• New development in the downtown study area
• Communication barriers are still a significant obstacle
Key deliverables:
• Retool Implementation Strategies
• Support the development of marketing/promotional tools
• Provide new strategies and tools for overcoming language barriers and communication challenges
• Support continuing planning efforts within the study area and identify opportunities for districts and catalyst developments
4
Las Vegas Medical DistrictPreliminary review:
• Completed LVMD facilities master plan and update underway
• RDA expansion, Opportunity Zone designation, and adoption of Form Based Code
• Significant investment in public infrastructure including complete streets improvements and improved transit options
Key deliverables:
• Summarize the lessons learned during the LVMD planning and development process
• Explore new opportunities to connect to UNLV’s main campus and adjacent downtown districts
• Research best practices for retrofitting a car‐centric district
• Research creative examples of public/private partnerships
Maryland Parkway CorridorPreliminary review: • RDA expansion, Opportunity Zone designation, adoption of
the Midtown Maryland Parkway District overlay, and adoption of a Brownfield Revitalization Program
• Variety of transit and planning studies completed including an Environmental Assessment, Cultural Resources Survey, and a Land Use and Economic Development Evaluation
• TOD planning study underway
• New mixed‐use development near UNLV
Key deliverables: • Retool Implementation Strategies
• Engage key stakeholders along the corridor and identify ongoing challenges and barriers
• Research best practices for retrofitting a car‐centric district
5
TimelineDTNLV
now – May 2020
LVMD
Feb – Aug 2020
Boulder Highway
May – Nov 2020
Maryland Parkway
Aug – Feb 2021
• Finalizing Phase I now
• Project scheduled to kick-off this month
• Ready to move forward
• Finalizing Phase I now
• Project schedule dependent on timeline of Facilities Master Plan update
• Preliminary research to begin in Feb. 2020
• Finalizing Phase I now
• Phase II to begin in May 2020 after the completion of current planning studies
• Preliminary research could begin by Feb. 2020
• Phase I to be finalized Aug 2020 once TOD planning deliverables are complete
• Project schedule dependent on progress of TOD planning grants
Southern Nevada Strong Opportunity Sites Plan Review
Stakeholder input Additional feedback?
Metropolitan Planning SubcommitteePreliminary Discussion Draft: 12 Nov 2019 November 12, 2019
Item #11 — Backuo Material 1
RTC MPO 2020 Regional Planning Annual Work ProgramFor SNS Plan Administration Annual
(For Amendment into the RTC Unified Planning Work Program as non-PL funded activities)
Task 700: Regional Policy Plan AdministrationThese activities define the Core Administration functions for the Southern Nevada StrongRegional Plan, which the Regional Transportation Commission (RTC) agreed to assume uponadoption of the Plan in 2015. Administration consists of planning, coordinating, and eithermanaging or encouraging the implementation of the Regional Plan. Because implementation ofthe Regional Plan — or conforming to it — is voluntary, administering the plan without authorityto implement most (non-transportation) parts is a challenge for the administrator. The goals ofadministering the Regional Plan on behalf of the Southern Nevada Regional Planning Coalitionare two-fold:
First, perform the regional plan-related tasks identified in Nevada Revised Statutes tohelp advance the legislative intent of regional planning identified in NRS277.02521; and
Second, perform the “Building Capacity for Implementation” tasks identified in the SNSRegional Plan Implementation Matrix for the RTC to lead.
Regional Plan Administration will consist of the following sub-tasks:
Sub-Task 700-1000: Regional Plan Core Administration:UAs designated by the SNRPC in accordance with NRS 277.02528(4) to administer the RegionalPolicy Plan, the RTC MPO team will perform the NRS-identified tasks specifically related to theRegional Plan. These primarily include performing plan conformity review in accordance withNRS 277.02577.
Activities:(1) Develop a framework for collaborative, consistent, and clear conformity review [Note: it
is anticipated that conformity reports will be presented to the SNRPC Board for anypotential formal actions] (Timeline: 2-4 months);
(2) Work with the City of Las Vegas to conduct collaborative conformity review throughoutthe development of its Master Plan (Match timeline to City schedule);
(3) Collaborate with Clark County to establish the conformity review process for itsupcoming comprehensive plan update (Match timeline to County schedule); and
(4) Conduct conformity review for any plans or plan elements that local partners developduring the year. (Timeline: Continuous throughout year)
Sub-Task 700-1100: Regional Plan Updates:As needed, the RTC MPO will develop and propose to the SNRPC potential updates of the SNSRegional Plan, in accordance with NRS 277.02528.
Activities:(1) Complete current efforts to update the Opportunity Sites plans (Timeline: TBD);
1
Preliminary Discussion Draft: 12 Nov 2019
(2) Review the SNS Vision Map to assess whether new developments/plans including OnBoard and Access2O4O, Henderson Strong, the CLV Master Plan update, the upcomingClark County Master Plan update, as well as ground-truthing actual developments since2014, indicate necessary revisions. (Timeline: 4-6 months; complete by August 2020)
Sub-Task 700-1200: Indicator Tracking and Mapping:As the RTC has done from the start of its SNS Regional Plan administration activities, the MPOteam will track key indicators relating to elements of the SNS plan.
Activities(1) Update current SNS Indicators Dashboard (Annual ongoing activity; deadline TED);(2) Collaborate with the Brookings Institute to develop a Southern Nevada version of the
Economic Value Atlas (Timeline: TED).
Sub-Task 700-1300: Citizens’ Planning Academythe MPO team will work with local jurisdictions on developing a citizens’ planning academy. Inalternating years, the focus would shift between an academy focused on explaining planningissues to the general public, and one focused on providing briefing and trainings for localappointed board members.
Sub-Task 700-1400: Annual Southern Nevada Strong Implementation ReportThe MPO team will prepare a report summarizing activities related to SNS implementation bylocal agencies and other SNS stakeholders. This report would probably be released concurrentlywith the annual update of the indicators dashboard.
Task 800: Regional Planning and Research[NOTE: This section still under development; RTC staff-identified and recommended projects areidentified below; basic project descriptions and purposes are provided; additional information ispreliminary]
Sub-Task 800-1010: Future Housing Inventory and Needs AnalysisThis study will apply established methodology to examine current demographic trends andprojections to estimate future (10-20 years) housing needs for the region, then comparecurrent zoning and land use plans to assess the provision of housing. The resulting analysis mayidentify surpluses and gaps across the region.
[Staff Note: this type of study is being conducted by most major region MPOs, as theconnection between housing and workforce transportation is increasingly recognized as animportant transportation-related issue.]
Timeline: 9-12 months; start Jan-Feb 2020
2
Preliminary Discussion Draft: 12 Nov 2019
Sub-Task 800-1020: Extreme Heat Events Coordinated Response StudySouthern Nevada has been identified as one of the fastest warming regions in the country, andrecent research has indicated a substantial risk of heat-related deaths. In conversations with avariety of stakeholders (Health District, local agencies and NGOs, NV Energy, and RIC transit)RTC has learned that - although most agencies have responses in place for extreme heat events- there is little to no coordination. This study would be much like the Human ServicesCoordinated Transportation Plan that RTC is currently developing; identify all the resources,identify all the needs and risks, identify the gaps, and then try to ID ways to fill those gaps.
[Staff Note: Given all the recent data and trends, this study seems very relevant, timely, andimportant to the region.]
Timeline: 3-6 months; start ASAP; target completion before summer 2020
Sub-Task 800-1030: Inventory of Regional Sustainability Planning Tools and TechniquesThere has been substantial discussion about the need for sustainability planning in SouthernNevada. This would be a relatively quick review of how other large regions address this. Fromconversations with other MPOs, there appear to be two approaches: (1) each local agencycompletes their own plan, and then a regional agency pulls them together into some type ofconsolidated plan; or (2) the regional agency and local agencies all work together to producesimultaneous local and regional plans.
[Staff Note: this would be a fairly quick process but would probably lead to discussions withstakeholders during or immediately upon completion about whether and how to proceed witha subsequent project to implement one of the two approaches identified above.]
Timeline: 2-4 months; start TBD
Sub-Task 800-xxxx: Tree Canopy Social Equity Impacts Research Project(in coordination with SNWA) - The MPO team would work with SNWA on their planned
assessment of the regional tree canopy. Specifically, we would handle examination of the socialequity aspects of the region’s tree canopy, while they would study the actual coverage, types ofcanopy, future heat impacts, etc.
[Staff Note: Staff proposes to work further with SNWA to develop this project and betterunderstand the timeline and level of effort. Staff recommends listing it as a future project.Depending on timing of the SNWA project the RTC effort may start in 2020.]
Timeline: IBD; start and completion TBD
3
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: CAPITAL PROJECT TRACKING AND PROJECT ACTIVITY STATUS REPORTS PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA (RTC) RECEIVE NOTIFICATION THAT THE MONTHLY CAPITAL PROJECT TRACKING REPORT AND THE UNIFIED PLANNING WORK PROGRAM PROJECT ACTIVITY STATUS REPORT HAVE BEEN POSTED TO THE RTC’S WEBSITE (FOR POSSIBLE ACTION) GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL TRANSPORTATION SYSTEM
FISCAL IMPACT: None by this action BACKGROUND: Each month, two reports are prepared to document the progress made on the various tasks and studies currently underway by the Regional Transportation Commission of Southern Nevada (RTC). The Capital Project Tracking Report identifies capital projects under development by the RTC. The Project Activity Status Report identifies current planning studies as outlined in the Unified Planning Work Program (UPWP). Since member entities may be involved in these activities, the RTC Board of Commissioners is notified when these reports are available on the agency’s website. Both the Capital Project Tracking Report and the UPWP Project Activity Status Report have been posted to the Transportation Planning page of the RTC website, located at: http://www.rtcsnv.com/planning-engineering/transportation-planning/ Respectfully submitted, ________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #3
January 14, 2020
cr Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: 2017-2040 REGIONAL TRANSPORTATION PLAN AMENDMENT CLARK 19-27 PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE RECEIVE AN UPDATE ON AMENDMENT CLARK 19-27 TO THE 2017-2040 REGIONAL TRANSPORTATION PLAN (FOR POSSIBLE ACTION) GOAL: IMPROVE THE EFFICIENCY AND EFFECTIVENESS OF THE TRANSPORTATION SYSTEM AND AIR QUALITY BY MANAGING CONGESTION
FISCAL IMPACT: None by this action BACKGROUND: The Regional Transportation Commission of Southern Nevada (RTC) adopted the 2017-2040 Regional Transportation Plan (RTP) at its February 9, 2017 meeting. Federal regulations require the RTP to be amended when there are major adjustments to program elements. RTP Amendment Clark 19-27 adds regionally significant projects sponsored by the Nevada Department of Transportation and local entities. A 21-day public review and comment period has been tentatively scheduled to occur from February 13, 2020 to March 5, 2020, with a public meeting held on February 19, 2020. The comment period will be publicly noticed and details of Amendment Clark 19-27 will be made available on the RTC website. The RTC will coordinate with the Environmental Protection Agency to perform transportation and air quality modeling as part of the required air quality conformity determination process. Staff anticipates that the RTC Board of Commissioners will take action on RTP Amendment Clark 19-27 on April 9, 2020. Respectfully submitted, ___________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #4
January 14, 2020
ak Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
Regional Transportation Plan (RTP) Access 2040 Amendment 19-27
Project List
TIP IDLOCAL
IDTITLE PROJECT TYPE FUNDING TOTAL COST MODELED
LISTED in
RTPNETWORK DESCRIPTION
RTP/TIP
YEAR
PROJECT
OPENING YEAR
HORIZON
YEAR
CL20190055 N/A I-15 Northbound Truck Climbing Lane Road Improvement FEDERAL, STATE $8,000,000 No Yes Regionally Significant Outside Network 2022 N/A N/A
CL20190056 N/A I-15 Northbound Truck Climbing Lane
Sandhill Road
Road Improvement FEDERAL, STATE $6,000,000 No Yes Regionally Significant Outside Network 2021 N/A N/A
CL20190060 N/A I 15 North of Logandale/Overton
Interchange mill and extending Truck
parking spaced
3R (Rehabilitation) FEDERAL, STATE $42,660,000 No Yes Regionally Significant Exempt and Outside
Network
2020 2023 2020
CL20190061 N/A I 15, Expend to 256 Truck Parking Spaces
at MP 96 Package 2
Other FEDERAL, STATE $4,730,000 No Yes Regionally Significant Exempt and Outside
Network
2022 N/A N/A
CL20180049 N/A Downtown Access Project Road Expansion (NEPA) FEDERAL, STATE $100,000,000 No Yes Regionally Significant Exempt 2024 N/A N/A
Cl20180050 N/A Downtown Access Project Road Expansion FEDERAL, STATE $900,000,000 Yes Yes Regionally Significant Modeled 2027 2031 2040
CL20160086 N/A US 95 NW PHASE 3D, MP 88 AND CC215
FROM GRAND MONTECITO TO TENAYA,
MP CL 37-39 AND US 95 AT LONE
MOUNTAIN MP CL 89.43
Road/Interchange/Intersecti
on Improvement
FEDERAL, STATE $169,000,000 Yes Yes Regionally Significant Modeled 2020 2023 2030
CL20180070 N/A I 515, CLARK COUNTY, AT EASTERN
AVENUE AND DESERT INN ROAD; US 95,
CLARK COUNTY, MP CL 69.00 TO MP CL
74.00
Replace bridge structures
(Safety)
FEDERAL, STATE $14,650,000 No Yes Regionally Significant Exempt 2021 N/A N/A
TIP IDLOCAL
IDTITLE PROJECT TYPE FUNDING TOTAL COST MODELED
LISTED in
RTPNETWORK DESCRIPTION
RTP/TIP
YEAR
PROJECT
OPENING YEAR
HORIZON
YEAR
N/A N/A Rancho Drive - Sahara to Mesquite Complete Street project -
No Capacity Change
Local $9,650,000 No Yes Regionally Significant Exempt 2024 N/A N/A
N/A N/A Charleston Complete Street - Rancho to
MLK
Add bicycle lanes and widen
sidewalks. No Capacity
Change
Local $31,850,000 No Yes Regionally Significant Exempt 2024 N/A N/A
TIP IDLOCAL
IDTITLE PROJECT TYPE FUNDING TOTAL COST MODELED
LISTED in
RTPNETWORK DESCRIPTION
RTP/TIP
YEAR
PROJECT
OPENING YEAR
HORIZON
YEAR
N/A N/A North 5th St. - Cheyenne to Lone
Mountain
Widen from 4 to 6 lanes Local $11,500,000 Yes Yes Regionally Significant Modeled 2027 2028 2030
TIP IDLOCAL
IDTITLE PROJECT TYPE FUNDING TOTAL COST MODELED
LISTED in
RTPNETWORK DESCRIPTION
RTP/TIP
YEAR
PROJECT
OPENING YEAR
HORIZON
YEAR
N/A N/A Rainbow Blvd. Saw tooth Completion Local $11,360,000 Yes Yes Regionally Significant Modeled 2028 2030 2030
NDOT
LAS VEGAS
NORTH LAS VEGAS
CLARK COUNTY
Page 1 of 1 12/30/2019
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: 2017-2040 REGIONAL TRANSPORTATION PLAN AMENDMENT CLARK 19-29 PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE APPROVE REGIONAL TRANSPORTATION PLAN AMENDMENT CLARK 19-29 TO THE 2017-2040 REGIONAL TRANSPORTATION PLAN (FOR POSSIBLE ACTION) GOAL: IMPROVE THE EFFICIENCY AND EFFECTIVENESS OF THE TRANSPORTATION SYSTEM AND AIR QUALITY BY MANAGING CONGESTION
FISCAL IMPACT: None by this action BACKGROUND: The Regional Transportation Commission of Southern Nevada (RTC) adopted the 2017-2040 Regional Transportation Plan (RTP) at its February 9, 2017 meeting. Federal regulations require the RTP to be amended when there are major adjustments to program elements. Amendment Clark 19-29 adds funds in federal fiscal years 2020 – 2023 for the continued maintenance and operation of the RTC transit system. Project details are included in the agenda backup. A 21-day public review and comment period has been scheduled to occur from January 16, 2020 to February 5, 2020. The comment period has been publicly noticed and details of Amendment Clark 19-29 are available on the RTC website. This amendment to the RTP does not impact air quality and is consistent with the RTP. Respectfully submitted, ___________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #5
January 14, 2020
ak Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
REGIONAL TRANSPORTATION PLAN AMENDMENT 19-29FLEET REPLACEMENT$90,966,076 - Fixed-route bus replacement$23,658,662 - Paratransit fleet replacement
TRANSIT FACILITIES & OPERATIONS$30,250,000 - Maintenance, equipment, software$18,750,000 - Transit facilities acquisitions and improvements$ 7,651,269 - Enhancements, bus shelters$ 3,750,000 - Regional security system
TRAVEL DEMAND MANAGEMENT$ 1,443,314 - Club Ride
Funds in federal fiscal years 2020 - 2023
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 9) 19-29CL200308 STATUS In Progress - Programmed FEDERALTitle: Transportation Demand Management: Club Ride Program
Description: Transportation Demand Management: Club Ride Program in Las Vegas region
Project Type:
ClarkCounty:
AQ: Exempt NDOT: District 1TCM:NoTDM
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2019 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2020 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2020 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2021 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2021 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2022 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2022 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2023 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2023 RTC Sales Tax $0 $0 $0 $72,166 $72,166
<2019 Prior $0 $0 $0 $5,486,766 $5,486,766
2019-2023 TOTAL $7,216,570 $0 $0 $0 $7,216,570
ALL YEARS TOTAL $12,703,336 $0 $0 $0 $12,703,336
MPO RTC Southern NevadaLead Agency RTCSNV (210)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 1 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-12 RTCSNV
6 Projects Listed
Previously Approved Version
CL200308 (Ver 8) 19-12
Title: Transportation Demand Management: Club Ride Program
Description: Transportation Demand Management: Club Ride Program in Las Vegas region
Project Type:
ClarkCounty:
AQ: Exempt NDOT: District 1TCM:NoTDM
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2019 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2020 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2020 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2021 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2021 RTC Sales Tax $0 $0 $0 $72,166 $72,166
2022 CMAQ - Clark County $0 $0 $0 $1,371,148 $1,371,148
2022 RTC Sales Tax $0 $0 $0 $72,166 $72,166
<2019 Prior $0 $0 $0 $5,486,766 $5,486,766
2019-2023 TOTAL $5,773,256 $0 $0 $0 $5,773,256
ALL YEARS TOTAL $11,260,022 $0 $0 $0 $11,260,022
MPO RTC Southern NevadaLead Agency RTCSNV (210)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 2 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 13) 19-29CL20150037 STATUS In Progress - Programmed FEDERALTitle: RTC Transit Facilities Acquisitions & Improvements
Description: RTC Transit Facilities Land and Building Acquisitions & Improvements
Project Type:
ClarkCounty:
AQ: Exempt, Other - Advance land acquisitions. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,400,000 $2,400,000
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $3,158,776 $3,158,776
2019 RTC Sales Tax $0 $0 $0 $2,300,880 $2,300,880
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $10,000,000 $10,000,000
2020 RTC Sales Tax $0 $0 $0 $2,500,000 $2,500,000
2021 FTA 5307 Lrg Urb Capital $0 $0 $0 $5,000,000 $5,000,000
2021 RTC Sales Tax $0 $0 $0 $1,250,000 $1,250,000
2022 FTA 5307 Lrg Urb Capital $0 $0 $0 $5,000,000 $5,000,000
2022 RTC Sales Tax $0 $0 $0 $1,250,000 $1,250,000
2023 FTA 5307 Lrg Urb Capital $0 $0 $0 $5,000,000 $5,000,000
2023 RTC Sales Tax $0 $0 $0 $1,250,000 $1,250,000
<2019 Prior $0 $0 $3,400,000 $24,484,656 $27,884,656
2019-2023 TOTAL $39,109,656 $0 $0 $0 $39,109,656
ALL YEARS TOTAL $63,594,312 $0 $0 $3,400,000 $66,994,312
MPO RTC Southern NevadaLead Agency RTCSNV (6175)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 3 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-21 RTCSNV
6 Projects Listed
Previously Approved Version
CL20150037 (Ver 12) 19-21
Title: RTC Transit Facilities Acquisitions & Improvements
Description: RTC Transit Facilities Land and Building Acquisitions & Improvements
Project Type:
ClarkCounty:
AQ: Exempt, Other - Advance land acquisitions. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,400,000 $2,400,000
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $3,158,776 $3,158,776
2019 RTC Sales Tax $0 $0 $0 $2,300,880 $2,300,880
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $10,000,000 $10,000,000
2020 RTC Sales Tax $0 $0 $0 $2,500,000 $2,500,000
<2019 Prior $0 $0 $3,400,000 $24,484,656 $27,884,656
2019-2023 TOTAL $20,359,656 $0 $0 $0 $20,359,656
ALL YEARS TOTAL $44,844,312 $0 $0 $3,400,000 $48,244,312
MPO RTC Southern NevadaLead Agency RTCSNV (6175)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 4 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 11) 19-29NV20090267 STATUS In Progress - Programmed FEDERALTitle: RTC Paratransit Fleet
Description: Acquire (338) vehicles for paratransit fleet replacement program
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase new buses and rail cars to replace existing vehicles or minor expansions of fleet.NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $4,000,000 $4,000,000
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $1,500,000 $1,500,000
2019 RTC Sales Tax $0 $0 $0 $1,147,059 $1,147,059
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,943,351 $2,943,351
2020 FTA 5310 Elderly/Disabled Lrg Urb Capital $0 $0 $0 $3,300,000 $3,300,000
2020 RTC Sales Tax $0 $0 $0 $1,119,415 $1,119,415
2021 FTA 5307 Lrg Urb Capital $0 $0 $0 $6,533,651 $6,533,651
2021 RTC Sales Tax $0 $0 $0 $1,152,997 $1,152,997
2022 FTA 5307 Lrg Urb Capital $0 $0 $0 $3,329,661 $3,329,661
2022 FTA 5310 Elderly/Disabled Lrg Urb Capital $0 $0 $0 $3,300,000 $3,300,000
2022 RTC Sales Tax $0 $0 $0 $1,187,587 $1,187,587
2023 FTA 5307 Lrg Urb Capital $0 $0 $0 $6,931,551 $6,931,551
2023 RTC Sales Tax $0 $0 $0 $1,223,215 $1,223,215
<2019 Prior $0 $0 $0 $33,599,706 $33,599,706
2019-2023 TOTAL $37,668,487 $0 $0 $0 $37,668,487
ALL YEARS TOTAL $71,268,193 $0 $0 $0 $71,268,193
MPO RTC Southern NevadaLead Agency RTCSNV (2053)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 5 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-21 RTCSNV
6 Projects Listed
Previously Approved Version
NV20090267 (Ver 10) 19-21
Title: RTC Paratransit Fleet
Description: Acquire (338) vehicles for paratransit fleet replacement program
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase new buses and rail cars to replace existing vehicles or minor expansions of fleet.NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $4,000,000 $4,000,000
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $1,500,000 $1,500,000
2019 RTC Sales Tax $0 $0 $0 $1,147,059 $1,147,059
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,943,351 $2,943,351
2020 FTA 5310 Elderly/Disabled Lrg Urb Capital $0 $0 $0 $3,300,000 $3,300,000
2020 RTC Sales Tax $0 $0 $0 $1,119,415 $1,119,415
<2019 Prior $0 $0 $0 $33,599,706 $33,599,706
2019-2023 TOTAL $14,009,825 $0 $0 $0 $14,009,825
ALL YEARS TOTAL $47,609,531 $0 $0 $0 $47,609,531
MPO RTC Southern NevadaLead Agency RTCSNV (2053)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 6 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 11) 19-29NV20120095 STATUS In Progress - Programmed FEDERALTitle: Las Vegas Area Transit Enhancements - Bus Shelters
Description: Bus Shelters (Transit Enhancements)
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Construction of small passenger shelters and information kiosks. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $5,200,389 $5,200,389
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $1,144,000 $1,144,000
2019 RTC Sales Tax $0 $0 $0 $1,586,097 $1,586,097
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,000,000 $2,000,000
2020 RTC Sales Tax $0 $0 $0 $1,950,100 $1,950,100
2021 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,000,000 $2,000,000
2021 RTC Sales Tax $0 $0 $0 $1,072,400 $1,072,400
2022 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,659,488 $1,659,488
2022 RTC Sales Tax $0 $0 $0 $414,872 $414,872
2023 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,087,091 $2,087,091
2023 RTC Sales Tax $0 $0 $0 $417,418 $417,418
<2019 Prior $0 $0 $0 $20,637,814 $20,637,814
2019-2023 TOTAL $19,531,855 $0 $0 $0 $19,531,855
ALL YEARS TOTAL $40,169,669 $0 $0 $0 $40,169,669
MPO RTC Southern NevadaLead Agency RTCSNV (2120)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 7 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-21 RTCSNV
6 Projects Listed
Previously Approved Version
NV20120095 (Ver 10) 19-21
Title: Las Vegas Area Transit Enhancements - Bus Shelters
Description: Bus Shelters (Transit Enhancements)
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Construction of small passenger shelters and information kiosks. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $5,200,389 $5,200,389
2019 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $1,144,000 $1,144,000
2019 RTC Sales Tax $0 $0 $0 $1,586,097 $1,586,097
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $2,000,000 $2,000,000
2020 RTC Sales Tax $0 $0 $0 $1,950,100 $1,950,100
<2019 Prior $0 $0 $0 $20,637,814 $20,637,814
2019-2023 TOTAL $11,880,586 $0 $0 $0 $11,880,586
ALL YEARS TOTAL $32,518,400 $0 $0 $0 $32,518,400
MPO RTC Southern NevadaLead Agency RTCSNV (2120)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 8 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 5) 19-29XS20180021 STATUS In Progress - Programmed FEDERALTitle: RTC Transit Improvements, repairs & maintenance, equipment & software replacement & additions
Description: RTC Transit Improvements, repairs & maintenance, equipment & software replacement & additions
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase of vehicle operating equipment. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $18,000,000 $18,000,000
2019 RTC Sales Tax $0 $0 $0 $4,500,000 $4,500,000
2020 FTA 5307 Lrg Urb Capital $0 $0 $2,430,200 $1,569,800 $4,000,000
2020 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $1,950,000 $5,525,000 $7,475,000
2020 RTC Sales Tax $0 $0 $1,657,550 $3,367,450 $5,025,000
2021 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $3,000,000 $3,000,000
2021 RTC Sales Tax $0 $0 $0 $750,000 $750,000
2022 FTA 5307 Lrg Urb Capital $0 $0 $0 $6,000,000 $6,000,000
2022 RTC Sales Tax $0 $0 $0 $1,500,000 $1,500,000
2023 FTA 5339 Bus/Fac Lrg Urb Capital $0 $0 $0 $6,000,000 $6,000,000
2023 RTC Sales Tax $0 $0 $0 $1,500,000 $1,500,000
2019-2023 TOTAL $51,712,250 $6,037,750 $0 $0 $57,750,000
ALL YEARS TOTAL $51,712,250 $0 $0 $6,037,750 $57,750,000
MPO RTC Southern NevadaLead Agency RTCSNV (6241)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 9 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-21 RTCSNV
6 Projects Listed
Previously Approved Version
XS20180021 (Ver 4) 19-21
Title: RTC Transit Improvements, repairs & maintenance, equipment & software replacement & additions
Description: RTC Transit Improvements, repairs & maintenance, equipment & software replacement & additions
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase of vehicle operating equipment. NDOT: District 1TCM:NoTransit-Capital & Rehab
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $18,000,000 $18,000,000
2019 RTC Sales Tax $0 $0 $0 $4,500,000 $4,500,000
2020 FTA 5307 Lrg Urb Capital $0 $0 $2,430,200 $1,569,800 $4,000,000
2020 RTC Sales Tax $0 $0 $607,550 $392,450 $1,000,000
2019-2023 TOTAL $24,462,250 $3,037,750 $0 $0 $27,500,000
ALL YEARS TOTAL $24,462,250 $0 $0 $3,037,750 $27,500,000
MPO RTC Southern NevadaLead Agency RTCSNV (6241)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 10 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-29 RTCSNV
6 Projects Listed
(Ver 9) 19-29NV20090276 STATUS In Progress - Programmed FEDERALTitle: Regional Transit System Security Systems
Description: Security systems for regional transit system
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase of vehicle operating equipment. NDOT: District 1TCM:NoTransit - Other
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $800,000 $800,000
2019 RTC Sales Tax $0 $0 $0 $200,000 $200,000
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,000,000 $1,000,000
2020 RTC Sales Tax $0 $0 $0 $250,000 $250,000
2021 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,000,000 $1,000,000
2021 RTC Sales Tax $0 $0 $0 $250,000 $250,000
2022 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,000,000 $1,000,000
2022 RTC Sales Tax $0 $0 $0 $250,000 $250,000
2023 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,000,000 $1,000,000
2023 RTC Sales Tax $0 $0 $0 $250,000 $250,000
<2019 Prior $0 $0 $0 $2,062,500 $2,062,500
2019-2023 TOTAL $6,000,000 $0 $0 $0 $6,000,000
ALL YEARS TOTAL $8,062,500 $0 $0 $0 $8,062,500
MPO RTC Southern NevadaLead Agency RTCSNV (2601)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 11 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-13 RTCSNV
6 Projects Listed
Previously Approved Version
NV20090276 (Ver 8) 19-13
Title: Regional Transit System Security Systems
Description: Security systems for regional transit system
Project Type:
ClarkCounty:
AQ: Exempt, Mass Transit - Purchase of vehicle operating equipment. NDOT: District 1TCM:NoTransit - Other
Not Location SpecificLimits:
OTHERCONROWPERevenue SourceFED FY TOTAL
2019 FTA 5307 Lrg Urb Capital $0 $0 $0 $800,000 $800,000
2019 RTC Sales Tax $0 $0 $0 $200,000 $200,000
2020 FTA 5307 Lrg Urb Capital $0 $0 $0 $1,000,000 $1,000,000
2020 RTC Sales Tax $0 $0 $0 $250,000 $250,000
<2019 Prior $0 $0 $0 $2,062,500 $2,062,500
2019-2023 TOTAL $2,250,000 $0 $0 $0 $2,250,000
ALL YEARS TOTAL $4,312,500 $0 $0 $0 $4,312,500
MPO RTC Southern NevadaLead Agency RTCSNV (2601)
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 12 of 13
Transportation Improvement Program Fiscal Year 2019-2022Amendment 19-13 RTCSNV
6 Projects Listed
RTCSNV Project Listing
Printed on Tuesday, December 31, 2019Page 13 of 13
RTP project # 2050 Add funds in the amount of $90,966,076 in local and federal funds for FFY 2021, 2022, and 2023 to purchase buses for fixed-route bus replacement program- As this project already going under an amendment not allowing to generate eSTIP change sheet. See detail of the changes below.
STIP PROJECT CHANGES PROJECT # 2050 TO 19-29 AMENDMENT FFY2020 FFY2021 FFY2022 FFY2023
LOCAL ID FUNDING SOURCE Description
19-00 Current
19-29 Amendment
19-29 Amendment
19-29 Amendment
#2050 - RTC Transit Fleet CNG Buses
#2050 - RTC Transit Fleet CNG Buses
CMAQ CMAQ 5307 Urbanized Area - -
5307 5307 Urbanized Area 34,549,761
41,447,441
12,771,264
13,154,405
5337 5337 State of Good Repair Formula
-
9,486,159 -
5339 5339 Bus and Bus Facilities Formula
9,600,000 -
RTC RTC Sales Tax 10,113,897
9,621,688
2,253,753
2,231,366
TOTAL #2050 - RTC Transit Fleet CNG Buses
54,263,658
60,555,288
15,025,017
15,385,771
Page 1 of 1
Public Notice
Notice of Comment Period for a 2017-2040 Regional Transportation Plan Amendment
The Regional Transportation Commission of Southern Nevada (RTC) is seeking public comment on the 2017 - 2040 Regional Transportation Plan (RTP) Amendment, number 19-29. The RTP amendment adds funds to the federal fiscal years from 2020 - 2023 for the continued maintenance and operation of the RTC transit system in Southern Nevada. The following changes are requested:
RTP Project # 2601: Add funds in the amount of $3,750,000 million for the regional transit security system
RTP Project # 6241: Add funds in the amount $30,250,000 for transit improvements including maintenance, equipment, and software replacement
RTP Project # 2120: Add funds in the amount $7,651,269 for transit enhancements, and bus shelters
RTP Project # 2053: Add funds in the amount of $23,658,662 for paratransit fleet replacement program
RTP Project # 6175: Add funds in the amount of $18,750,000 for transit facilities acquisitions and improvements
RTP project # 2050: Add funds in the amount of $90,966,076 to purchase buses for fixed-route bus replacement program
RTP project # 210: Add funds in the amount of $1,443,314 for Club Ride, a program that promotes greener commutes
This amendment to the RTP does not impact air quality and is consistent with the RTP. Project details will be available at the RTC Administration Building and on rtcsnv.com during a 21-day public comment period from January 16, 2020 to February 5, 2020. Submit comments/questions by 5 p.m. February 5, 2020: Attn: Karen Castro Email: [email protected] Phone: 702-676-1698 TDD: 702-676-1834 Mail to: RTC of Southern Nevada 600 S. Grand Central Parkway Las Vegas, NV 89106 For more information visit: www.rtcsnv.com
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [ X ] Transit [ ] Administration and Finance [ ] SUBJECT: ON BOARD MOBILITY PLAN
PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE RECEIVE AN UPDATE ON DEVELOPMENT OF ON BOARD, THE REGIONAL MOBILITY PLAN (FOR POSSIBLE ACTION) GOAL: ENHANCE MOBILITY BY IMPROVING TRANSPORTATION CHOICES AND FACILITATING MULTI-MODAL CONNECTIVITY
FISCAL IMPACT: None by this action BACKGROUND: The Regional Transportation Commission of Southern Nevada (RTC), as the designated Metropolitan Planning Organization (MPO) and designated recipient of planning funding from the Federal Transit Administration (FTA), is currently developing a Regional Mobility Plan called On Board. On Board has gathered substantial community and stakeholder input to identify needs and recommended alternatives for high-capacity transit, traditional transit, mobility competitiveness, mobility strategies, and emerging transit technologies and understanding their economic impacts. The RTC and a team of national mobility experts began developing On Board in the spring of 2017. Staff will present the On Board Preliminary Recommendations consisting of eight primary strategies and 65 implementing projects. A three-month public engagement process will start in January 2020, and the final plan is anticipated to be adopted by the RTC Board of Commissioners in spring 2020. Staff will provide an update on the status, content, and current efforts to present On Board to the public and complete the plan. The public and stakeholders are invited to rate the eight primary strategies and provide feedback at: https://onboardsnv.com/ Respectfully submitted, ____________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #6
January 14, 2020
ak Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
REGIONAL TRANSPORTATION COMMISSION OF
SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: SOUTHERN NEVADA STRONG REGIONAL IMPLEMENTATION ACTIVITY PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE RECEIVE AN UPDATE ON IMPLEMENTATION ACTIVITY OF THE REGIONAL PLAN GOAL: SUPPORT REGIONAL PLANNING EFFORTS TO IMPROVE ECONOMIC VITALITY AND EDUCATION AND INVEST IN COMPLETE COMMUNITIES FISCAL IMPACT: None BACKGROUND: As administrator of the Southern Nevada Strong (SNS) Regional Plan, the Regional Transportation Commission of Southern Nevada (RTC) Metropolitan Planning Organization regional planning staff is tasked with tracking and reporting activity and progress on implementation the SNS plan by regional stakeholders. Staff have annually compiled an implementation activity graphic to display ongoing activity for all 302 strategies identified in the plan and implementation matrix. Staff will present the 2019 implementation results and compare implementation progress over the past three years. Staff will also present upcoming work projects that will support future activity to implement the Regional Plan. Respectfully submitted, __________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #7
January 14, 2020
rl Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: FY 2020-2021 UNIFIED PLANNING WORK PROGRAM – AMENDMENT TWO PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE APPROVE THE FISCAL YEARS 2020-2021 UNIFIED PLANNING WORK PROGRAM – AMENDMENT TWO (FOR POSSIBLE ACTION) GOAL: ENHANCE MOBILITY BY IMPROVING TRANSPORTATION CHOICES AND FACILITATING MULTI-MODAL CONNECTIVITY FISCAL IMPACT: This amendment increases Federal Highway Administration (FHWA) reimbursable funding by $797,703.00 for studies identified in the Fiscal Years (FY) 2020 and 2021 Unified Planning Work Program (UPWP). BACKGROUND: The UPWP is prepared by the Regional Transportation Commission of Southern Nevada (RTC) Metropolitan Planning Organization and identifies upcoming work tasks in five different categories – Planning Administration, Coordination, Outreach; Data Collection; Long Range Transportation Planning; Multimodal Transportation Studies; and Intelligent Transportation Studies. The current FYs 2020-2021 UPWP was approved by the RTC Board of Commissioners on May 23, 2019, and the FHWA on June 3, 2019. The 2020-2021 UPWP – Amendment One was approved by the RTC Board of Commissioners on December 12, 2019. The UPWP is typically amended to reflect project funding changes and emerging planning needs. This amendment includes adding funding for Planning Administration, and a new study to conduct transportation and land use scenario planning. Additionally, tasks related to regional planning and administering the Southern Nevada Strong Regional Plan are included in this amendment. Staff recommends approval. Respectfully submitted, __________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #8
January 14, 2020
ak Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
1
Unified Planning Work Program
• Federally required planning document.
• Establishes core activities and studies for the MPO.
• Covers a two-year planning period.
• Amended for project funding changes and emerging
planning needs.
2020-2021 UPWP AMENDMENT TWO
• Adds funding for the General Outreach task to conduct surveys that gather
public opinions and attitudes about transportation-related issues.
• Amends the Planning Administration task to clarify RTC membership in
national membership organizations, and adds funding to support the full range
of activities required for multimodal transportation planning.
• Adds additional software programs under the Miscellaneous task as potential
programs to be utilized to enhance transportation planning.
• Adds a new project to perform land use and transportation scenario planning
to inform regional planning efforts.
2
2020-2021 UPWP AMENDMENT TWO
• Adds new regional planning tasks to ensure RTC’s administration of the
Southern Nevada Strong Regional Plan are consistent with agency planning
activities, and clarify reimbursement using federal planning funds.
• Adds Task 501: Regional Policy Plan Administration• Regional Plan Core Administration
• Regional Plan Updates
• Indicator Tracking and Mapping
• Community Planning Academy
• Outreach and Communications
• Annual SNS Implementation Report
• Adds Task 601: Regional Planning and Research• Future Housing Inventory and Needs Analysis
• Extreme Heat Events Coordinated Response Study
• Inventory of Regional Sustainability Planning Tools and Techniques
• Tree Canopy Social Equity Impacts Research Project
• Total funding changes resulting from Amendment Two is an
increase of $797,703 in Fiscal Years 2020 and 2021 to be
reimbursed by the Federal Highway Administration.
• Funding increase is within the budgeted amount projected to be
available through Fiscal Year 2021.
2020-2021 UPWP AMENDMENT TWO
1/2/2020 1
FY2020-2021 Unified Planning Work Program
Amendment Two: Summary of Changes
Sub-Task 101-1500-20 General Outreach
Adds language specifically allowing the RTC to conduct representative surveys (recurring or
special) to gather public opinions and attitudes about general transportation-related issues.
Surveys related to individual projects or tasks are not included in this sub-task. (Fiscal Impact:
increases FY2020 funding by $60,000 to support anticipated survey in Spring 2020)
Sub-Task 101-2310-20 Planning Administration
Clarifies travel to meetings, workshops, and conferences is a function of planning administration
(No Fiscal Impact)
Clarifies agency membership in national membership organizations (e.g., Association of
Metropolitan Planning Organizations, National Association of Regional Councils, etc.) is a
function of planning administration (No Fiscal Impact)
Adds language allowing the use of contracted professional services to enhance RTC’s planning
services across multiple UPWP tasks or services. (Fiscal Impact: Adds $225,000 total; $77,500 in
FY2020 and $147,500 in FY2021)
Sub-Task 101-3600-20 Miscellaneous
Adds additional software programs to list of potential applications for enhancing transportation
planning. Specifies Stata, Sugar Access, and Community Remarks as potential programs for
planning-related uses. (No Fiscal Impact)
Sub-Task 201-9215-19 Land Use and Transportation Scenario Planning
NEW SUB-TASK (Fiscal Impact: Adds $225,000 total; $77,500 in FY2020 and $147,500 in FY2021)
Adds Consultant support to perform land use and transportation scenario planning, perform
other quantitative analysis, and provide additional planning support as needed.
1/2/2020 2
New Regional Planning Tasks
The following Tasks and Sub-Tasks are added to the UPWP to make the RTC’s administration of the
Southern Nevada Strong Regional Plan consistent with other agency planning activities. This addition will
also clarify that a portion of these regional planning activities have a transportation nexus and are
eligible for reimbursement using federal planning funds. (Fiscal Impact: adds approximately $600,000 of
total project costs over FY2020 and FY2021. Approximately $375,000 would be reimbursable from
federal planning funds.)
Task 501: Regional Policy Plan Administration
Specific Sub-Tasks are:
501-1000-20: Regional Plan Core Administration
501-1010-20: Regional Plan Updates
501-1050-20: Indicator Tracking and Mapping
501-1100-20: Community Planning Academy
501-1150-20: Outreach and Communications
501-1160-20: Annual Southern Nevada Strong Implementation Report
Task 601: Regional Planning and Research
Specific Sub-Tasks are:
601-1010-20: Future Housing Inventory and Needs Analysis
601-1020-20: Extreme Heat Events Coordinated Response Study
601-1030-20: Inventory of Regional Sustainability Planning Tools and Techniques
601-1040-20: Tree Canopy Social Equity Impacts Research Project
1 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Task 501: Regional Policy Plan Administration The following work activities will be conducted by the Regional Transportation Commission of Southern Nevada, as the region’s designated Metropolitan Planning Organization, to administer the Southern Nevada Strong Regional Plan. In completing these activities the MPO will follow established best practices for conducting a continuous, cooperative, and comprehensive planning process, and – to the maximum extent possible – conform to the metropolitan transportation planning procedures described in 23 CFR 450 (“Statewide and Nonmetropolitan Transportation Planning and Metropolitan Transportation Planning”). Task 501 and relevant sub-tasks define the Core Administration functions for the Southern Nevada Strong Regional Plan, which the Regional Transportation Commission (RTC) agreed to assume upon adoption of the Plan in 2015. Administration consists of planning, coordinating, and either managing or encouraging the implementation of the Regional Plan. Because implementation of the Regional Plan – or conforming to it – is voluntary, administering the plan without authority to implement most (non-transportation) parts requires focusing efforts on supporting local governments and stakeholders as they implement the Regional Plan. The goals of administering the Regional Plan on behalf of the Southern Nevada Regional Planning Coalition are two-fold:
First, perform the regional plan-related tasks identified in Nevada Revised Statutes to help advance the legislative intent of regional planning identified in NRS 277.02521; and Second, perform the “Building Capacity for Implementation” tasks identified in the SNS Regional Plan Implementation Matrix for the RTC to lead.
Specific Sub-Tasks are: 501-1000-20: Regional Plan Core Administration 501-1010-20: Regional Plan Updates 501-1050-20: Indicator Tracking and Mapping 501-1100-20: Community Planning Academy 501-1150-20: Outreach and Communications 501-1160-20: Annual Southern Nevada Strong Implementation Report Task 501, 20202-2021 Budget The following costs are included in Task 501:
FY 2020 FY 2021
RTC Staff Costs
Professional Services Costs
Combined Costs
The source of funds for Task 501 is
Consolidated Planning Grant
Local Funds
2 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1000-20: Regional Plan Core Administration Purpose: As designated by the SNRPC in accordance with NRS 277.02528(4) to administer the Regional Policy Plan, the RTC MPO team will perform the NRS-identified tasks specifically related to the Regional Plan. These primarily include performing plan conformity review in accordance with NRS 277.02577, but may include other activities necessary to administer the Plan. Previous Work:
Regional Planning team has been tasked with administration since 2015 Methodology:
Develop a framework for collaborative, consistent, and clear conformity review
Work with the City of Las Vegas to conduct collaborative conformity review throughout the development of its Master Plan
Collaborate with Clark County to establish the conformity review process for its upcoming comprehensive plan update
Conduct conformity review for any plans or plan elements that local partners develop during the year
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Clark County School District, Southern Nevada Regional Planning Coalition
Budget: [~250-400 hours; potential 20% PL Reimbursable]
Schedule and Deliverables:
Conformity review memo upon Master/Comprehensive plan adoption
Ongoing activity
Sub-Task 501-1000-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
3 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1010-20: Regional Plan Updates Purpose: As needed, the RTC MPO will develop and propose to the SNRPC potential updates of the SNS Regional Plan, in accordance with NRS 277.02528. Previous Work: Methodology:
Complete current efforts to update the Opportunity Sites strategies of each Site: Downtown North Las Vegas, Las Vegas Medical District, Maryland Parkway, and Boulder Highway at Broadbent/Gibson
Review the SNS Vision Map to assess whether new developments/plans including On Board and Access2040, Henderson Strong, the CLV Master Plan update, the upcoming Clark County Master Plan update, as well as ground-truthing actual developments since 2014, indicate necessary revisions
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Clark County School District, Southern Nevada Regional Planning Coalition
Budget: [~500-1000 hours; potential 25-50% PL Reimbursable]
Schedule and Deliverables:
Downtown North Las Vegas Opportunity Site Review complete in FY 2020
Las Vegas Medical District, Maryland Parkway, and Boulder Highway at Broadbent/Gibson Opportunity Site Review complete in FY 2021
Vision map proposal presented to SNRPC in August 2020
Sub-Task 501-1010-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
4 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1050-20: Indicator Tracking and Mapping Purpose: As the RTC has done from the start of its SNS Regional Plan administration activities, the MPO team will track key indicators relating to elements of the SNS plan. Tracking includes updating up to 30 regional indicators that provide overarching metrics for progress on the goals within the Regional Plan including educational attainment, housing costs, median income, volunteer rates, and health insurance coverage rates. Indicators have also been translated into narrative analysis on the digital platform “Live Stories” found on the SNS website. For several years, the MPO team has created multiple mapping resources to assist partners to understand spatial relations of demographics and/or the regional metrics. In FY 2020, the team will begin developing a new map resource that will develop values to capture the complex, inter-dependent relationship between transportation infrastructure, land use planning, and economic activity. Previous Work:
Annual report (2017, 2018)
Development of Live Stories (2019)
Project Analysis Tool (2016)
Equity Map (updated 2019)
Community Engagement Map (2018)
Methodology:
Update current SNS Indicators Dashboard
Collaborate with the Brookings Institute to develop a Southern Nevada version of the Economic Value Atlas
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Clark County School District, Southern Nevada Regional Planning Coalition
Southern Nevada Health District, University of Nevada Las Vegas, Las Vegas Global Economic Alliance, Brookings DC, Nevada Department of Transportation, Urban Lands Institute, Southern Nevada Water Authority
Budget: [~500-750 hours; potential 50% PL Reimbursable]
5 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1050-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
Schedule and Deliverables:
Indicator update annual ongoing activity
Published indicator dashboard Jan 2021
Value atlas initiation in FY20, ongoing through FY21
6 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1100-20: Community Planning Academy Purpose: The MPO team will work with local jurisdictions and the Nevada APA chapter on developing a community planning academy. In alternating years, the focus would shift between an academy focused on explaining planning issues to the general public, and one focused on providing briefing and trainings for local appointed board members. The long-term goal for the academy is to increase the local understanding of planning issues and process. Previous Work: Methodology:
Research existing programs held throughout the country
Contextualize content for Southern Nevada and current issues
Host academy weekly across 6 weeks with expert speakers Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite
Nevada American Planning Association Budget: [~250-400 hours; potential 50-100% PL Reimbursable depending on content]
Schedule and Deliverables:
Ongoing
Academy will be held annually in late spring or early summer
Sub-Task 501-1100-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
7 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1150-20: Outreach and Communications Purpose: The MPO team will perform outreach and communications-related elements in the “Building Capacity for Implementation” portion of the Southern Nevada Strong Regional Plan Implementation Matrix. Specific ongoing activities include production of the SNS quarterly newsletter, maintenance of the regional planning contacts list, providing social media content, etc. Included this task will also be continued coordination and participation with regional coalitions and work groups related to goals within the regional plan. Stakeholder outreach and coordination allows the MPO Team to identify current issues and regional progress. Previous Work:
Quarterly newsletter published 2016, 2017, 2018, 2019 Methodology:
Support partnership with local agencies and key stakeholders to identify progress and local issues
Participation in meetings, workshops, coalitions that carry out work related to the regional plan goals
Draft, finalize and publish quarterly newsletters
Amplify and share news related to progress on the regional plan via social media
Additional communications related activities are performed by the MPO, RTC Government Affairs, Media and Marketing, and Executive Management
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite
Budget: [~500 hours; probably not PL Reimbursable]
Sub-Task 501-1150-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
8 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Schedule and Deliverables:
Ongoing
Efforts focused on quarterly production of SNS newsletter to be published in January, April, July, and October annually
9 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 501-1160-20: Annual Southern Nevada Strong Implementation Report Purpose: On an annual basis, staff at the RTC, the agency responsible for administration of the Regional Plan, create a summary of implementation progress to show the cumulative progress the region makes on each strategy. This report would be released concurrently with the annual update of the indicators dashboard. While the primary stakeholder involved in regional plan coordination tends to be agency staff within the planning department, regional implementation encompasses every department within local government as well as state government, nonprofit organizations, and private business. A full and comprehensive review of strategy progress relies on staff responsiveness and assistance on research. Previous Work:
Annual report (2017, 2018) Methodology:
Distribution of implementation strategies by “lead responsible agency” for stakeholder review
MPO staff review of all strategies
Follow-up inquiries distributed to all partners, connect with additional partners and communications teams
Continue to inquire of progress
Draft annual report for review Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Clark County School District, Southern Nevada Regional Planning Coalition
Southern Nevada Health District, University of Nevada Las Vegas, Las Vegas Global Economic Alliance, Nevada Department of Transportation, Urban Lands Institute, Southern Nevada Water Authority
10 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Budget: [~250 hours; potential 20% PL Reimbursable]
Schedule and Deliverables:
Completed annually by December, published in January
Sub-Task 501-1160-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
11 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Task 601: Regional Planning and Research Based on stakeholder request and input, the MPO Regional planning staff identified the following projects to support and promote progress of the regional plan. Following years of staff assistance on tracking and communications, the team will now work to provide technical assistance in research and planning so that individual agencies and local governments can carry out their tasked strategies within the regional plan. To best support the forward movement and progress of these strategies, the MPO team will provide specific research and analysis that can inform implementation. Progress on all regional plan strategies are voluntary and based on current needs, available resources, and motivation on the part of those responsible for each strategy. Specific Sub-Tasks are: 601-1010-20: Future Housing Inventory and Needs Analysis 601-1020-20: Extreme Heat Events Coordinated Response Study 601-1030-20: Inventory of Regional Sustainability Planning Tools and Techniques 601-1040-20: Tree Canopy Social Equity Impacts Research Project Task 601, 2020-2021 Budget The following costs are included in Task 601:
FY 2020 FY 2021
RTC Staff Costs
Professional Services Costs
Combined Costs
The source of funds for Task 601 is
Consolidated Planning Grant
Local Funds
12 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 601-1010-20: Future Housing Inventory and Needs Analysis Purpose: This study will apply established methodology to examine current demographic trends and projections to estimate current housing needs and future trends in housing for the region, then compare current zoning and land use plans to assess the provision of housing. The resulting analysis may identify surpluses and gaps across the region. Previous Work: Methodology:
Compile existing residential zoning information including area and average density
Analyze population forecast for demographic shifts
Research trends in housing demand based on demographic
Publish findings to inform local policy Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Southern Nevada Regional Planning Coalition
Budget: [~2000 hours; 100% PL Reimbursable]
Sub-Task 601-1010-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
Schedule and Deliverables:
9-12 months; start Jan-Feb 2020
13 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 601-1020-20: Extreme Heat Events Coordinated Response Study Purpose: Southern Nevada has been identified as one of the fastest warming regions in the country, and recent research has indicated a substantial risk of heat-related deaths from an increasing number and duration of extreme heat events in the region. In conversations with a variety of stakeholders, RTC has learned that - although many local agencies have responses in place for extreme heat events - there is no consolidated assessment of vulnerability risk, no current inventory of related resources, and little coordination of responses and services. This study will look at the emergency response system and analyze its ability to respond to extreme heat incidents and other concerns. Previous Work: Methodology:
Identify existing services, systems, and resources
Identify all the gaps, needs, and risks Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Southern Nevada Regional Planning Coalition
Southern Nevada Health District, NV Energy, Southern Nevada Water Authority Budget: [~1000-1200 hours; likely 100% PL Reimbursable]
Sub-Task 601-1020-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
Schedule and Deliverables:
3-6 months; target completion before summer 2020
14 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 601-1030-20: Inventory of Regional Sustainability Planning Tools and Techniques Purpose: There has been substantial discussion about the need for sustainability planning in Southern Nevada. Prior to this full undertaking, the MPO staff will perform a quick review of how other large regions address sustainability. Learning from other MPOs, there appear to be two approaches: (1) each local agency completes their own plan, and then a regional agency pulls them together into some type of consolidated plan; or (2) the regional agency and local agencies all work together to simultaneously produce regional goals, and local and regional sustainability plans. Through research and interviews, the MPO staff will create a report that identifies specific practices and methodologies of sustainability planning to share with the public agencies within Southern Nevada. This work will be used to plan and develop a future sustainability plan following the recommendation from local agencies. Previous Work: Methodology:
Identifying existing sustainability plans at agency and community level
Preparing report about scale, scope, outreach, methods, and other relevant processes
Present findings to RTC working groups to obtain recommendation on future work program
Participating Agencies:
Regional Transportation Commission of Southern Nevada
Budget: [~250 hours; potential 100% PL Reimbursable]
Sub-Task 601-1030-20 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
Schedule and Deliverables:
2-4 months; starting early 2020
15 FISCAL YEARS 2020 – 2021 UNIFIED PLANNING WORK PROGRAM
REGIONAL WORK PROGRAM
Sub-Task 601-1040-20: Tree Canopy Social Equity Impacts Research Project Purpose: The MPO team will work with the Southern Nevada Water Authority (SNWA) on their planned assessment of the regional tree canopy. Specifically, SNWA would study the actual coverage, types of canopy, future heat impacts, etc., while the RTC would handle examination of the social equity aspects of the region’s tree canopy, and identify examples and resources to respond to inequity issues related to the tree canopy. Previous Work: Methodology:
Following the tree canopy study, staff will analyze spatial distribution in combination with demographic and economic indicators
Study will identify specific vulnerable neighborhoods or potential risk areas that could be targets for intervention or future investment
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of Boulder City, City of Mesquite, Southern Nevada Regional Planning Coalition
Southern Nevada Water Authority Budget: [~1000 hours; potential 25-50% PL Reimbursable]
Sub-Task 601-1040-02 FY 2020 FY 2021
Total Project Cost
RTC Staff Costs
Professional Services Costs
Funding Sources
Consolidated Planning Grant
Local Funds
Schedule and Deliverables:
TBD, based on SNWA timeline
Final report to include maps and risk factors
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: REGIONAL STAFF UPDATES PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE RECEIVE REGIONAL STAFF UPDATES GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL TRANSPORTATION SYSTEM
FISCAL IMPACT: None by this action BACKGROUND: In 2003, the Metropolitan Planning Subcommittee (MPS or Subcommittee) requested that a standing item be established to receive information, in an informal manner, from staff about regional activities in Southern Nevada. This item covers the following areas of interest:
1) Regional Transportation Planning – Regional Transportation Commission of Southern Nevada; 2) Regional Land Use Planning and coordination with the Southern Nevada Regional Planning
Coalition; 3) Air Quality – Clark County Department of Air Quality, and; 4) Regional bicycle, pedestrian, transportation safety and complete streets planning.
In addition, all members of the Subcommittee may share information on matters of common interest. While no action may be taken on the subjects discussed, this item provides opportunity for the exchange of information and may serve as the forum to recommend future MPS agenda items. Respectfully submitted, ___________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #9
January 14, 2020 cr Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E
REGIONAL TRANSPORTATION COMMISSION
OF SOUTHERN NEVADA
AGENDA ITEM
Metropolitan Planning Organization [ ] Transit [ ] Administration and Finance [X] SUBJECT: CITIZENS PARTICIPATION PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE METROPOLITAN PLANNING SUBCOMMITTEE CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL TRANSPORTATION SYSTEM
FISCAL IMPACT: None BACKGROUND: In accordance with State of Nevada Open Meeting Law, the Regional Transportation Commission of Southern Nevada (RTC) Metropolitan Planning Subcommittee (Subcommittee) shall invite interested persons to make comments. For the initial Citizens Participation, the public should address items on the current agenda. For the final Citizens Participation, interested persons may make comments on matters within the Subcommittee’s jurisdiction, but not necessarily on the current agenda. No action can be taken on any matter discussed under this item, although the Subcommittee can direct that it be placed on a future agenda. Respectfully submitted, ____________________________ CRAIG RABORN Director of Metropolitan Planning Organization MPS Item #10
January 14, 2020 mld Non-Consent
DocuSign Envelope ID: 83D53271-9B8B-4791-BAF2-04D94CF54E4E