MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/324 Jabalpur, dated:12.02.2021 To As per distribution list Sub: Minutes of 76 th meeting of Operation and Coordination Committee of MP. The Minutes of 76 th meeting of the Operation and Coordination Committee of MP held on 23 rd December 2020 has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. It is also to intimate that due to outbreak of Covid-19 and as per precautionary measures the 76 th OCC is being conducted through video conferencing. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Transcript of MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED ...

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/324 Jabalpur, dated:12.02.2021

To

As per distribution list

Sub: Minutes of 76th meeting of Operation and Coordination Committee of MP.

The Minutes of 76th meeting of the Operation and Coordination Committee of MP held on

23rd December 2020 has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and

can be downloaded. It is also to intimate that due to outbreak of Covid-19 and as per

precautionary measures the 76th OCC is being conducted through video conferencing.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected].  15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] [email protected]  21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected],    [email protected], M-

9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa

(MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP)

– 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551,

Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina-

470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],

26. The General Manager Operation Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt.

Hoshangabad, Email – [email protected] , [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

The 75th meeting of Operation & Coordination Committee of MP was held on 23rd DECEMBER 2020

at 11:00 AM through video conferencing. The list of participants is enclosed as Annexure -1.0.

Shri. R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM welcomed all the guests &

participants attending the 76th OCCM of MP. Member Secretary OCC stated that the demand of MP has

increased due to ongoing Rabi season and the high demand is being meet safely with the coordination and

cooperation of each entity the without any disturbance or constraint in the system.

Thereafter the agenda points were taken up, which are narrated here under: -

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 75TH meeting of Operation & Coordination Committee of MP held telephonically, on 06th October 2020 were forwarded to the committee members vide

No. 07-05/SG-9B-II/2057 Jabalpur dated 18.12.2020. No comments have been received. Committee confirms the minutes.

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS SEPTEMBER 2020 TO NOVEMBER 2020.

2.1. Frequency Particulars: The committee was apprised that during SEPTEMBER 2020 the system

frequency was below 49.90 Hz for 4.23% of time against 3.91% of time during OCTOBER 2020. The system

frequency was above 50.05 Hz for 11.54% of time during SEPTEMBER 2020 against 14.21% of time during

OCTOBER 2020. The system frequency was within the IEGC range of 49.90-50.05 Hz for 84.23% of the time

during SEPTEMBER 2020 against 81.87% of time during OCTOBER 2020. The average monthly frequency

was 50.00 Hz during month of SEPTEMBER 2020 and 50.00 Hz during month of OCTOBER 2020.

The detailed frequency particulars for the month of SEPTEMBER 2020 TO NOVEMBER 2020 are

enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:-

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

SEPTEMBER2020

50.00 Hz 49.79 Hz 50.09 Hz 49.64 Hz 50.20 Hz

OCTOBER 2020

50.00 Hz 49.81 Hz 50.11 Hz 49.70 Hz 50.27 Hz

NOVEMBER 2020

49.84 Hz  49.84 Hz 50.08 Hz  49.68 Hz  50.27 Hz

2.2 Operational Matters

2.2.1 Operational Discipline: The committee was apprised that System operated in terms of frequency

profile for the months SEPTEMBER 2020, OCTOBER 2020 & NOVEMBER 2020 is as given below for

discussion by the committee:

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50.05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

MINUTES FOR 76th MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 23rd DECEMBER 2020 AT 11:00 AM THROUGH VIDEO CONFERENCING.

Minutes of 76th OCCM of MP 1

SEPTEMBER 2020

4.23% 11.54% 84.23% 50.00 Hz

OCTOBER 2020

3.91% 14.21% 81.87% 50.01 Hz

NOVEMBER 2020

4.53% 15.65% 79.82% 50.01 Hz 

2.2.2 Voltage Profile: The committee was apprised about the maximum and minimum voltage as recorded at

important 400 KV s/s in MP Grid from SEPTEMBER 2020 to NOVEMBER 2020 is enclosed as Annexure –

2.2.2. Committee was informed that voltages at 400KV S/s Kirnapur was high and the issue of high

voltage at 400KV S/s Kirnapur shall be resolved after installation of reactor and the work shall be

expedited.

2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised about the

updated information of the status of capacitor banks in sub-transmission system as on 31th MARCH 2020 as

submitted by DISCOMs is detailed below:

Discoms were requested to identify the low voltage pockets and the future plan for addition of

capacitor bank to resolve the issue of low voltage.      

 

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The

committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in

EHV transmission system as on 30.11.2020 as submitted by MPPTCL is given below: -

Voltage

Class

Capacitor bank

installed as on

31.08.20(MVAR)

Capacity Added

after Last OCC

Meeting (MVAR)

TOTAL

CAPACITY AS

ON 30.11.2020

(MVAR)

Capacitor Bank

Installed but

defective & are not

repairable (No &

MVAR)

220 KV 100.00 0.00 100.00

All in Service

132 KV 1238.00 0.00 1238.00

33/36 KV 5695.00 72.00 5767.00

TOTAL 7009.00 0.00 7105.00

DIS

CO

M

Capacitor bank

installed in good

condition (No)

Capacitor

Banks healthy

but not in

service due to

control ckt

problem

Capacitor bank

installed but

defective & are

repairable (No)

Require

ment of

repair

against

each

unit (No)

Requiremen

t against

non-

repairable

capacitor

banks

Capacitor

banks already

covered under

ADB T-V

Balance

capacitor

banks to be

covered in

other

schemes

600

KVAR

1200

KVAR

1500

KVAR

1800

KVAR

600

KVA

R

1200

KVA

R

1500

KVA

R

600

KVAR

1200

KVAR

1500

KVAR

No of 100

KVAR

Units

required

600

KVAR

1200

KVAR

600

KVAR

1200

KVAR

600

KVAR

1500

KVAR

EZ 410 134 109 - 1 7 - 10 6 0 - 34 7 0 0 - 0

CZ 0 620 1032 63 - - - 0 0 0 NIL 0 0 0 0 0 0

WZ 601 511 750 - 1 7 4 19 30 60 438 09 19 0 0 - 0

Minutes of 76th OCCM of MP 2

The plan for installation of capacitor banks installed at EHV Transmission Substation is enclosed as Annexure-2.2.4.

2.2.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: The committee was apprised that the Frequency did not touch 49.20 Hz

from OCTOBER 2020 and NOVEMBER 2020. There was no df/dt operation during the same period.

MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation.

(ii) Defective u/f, df/dt Relays: The committee was apprised that MPPTCL has informed that All the df/dt

and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed

for under frequency operation. At 132KV S/S Chapda the df/dt protection is provided through df/dt feature

of DPR. All U/F stages are in good/ healthy & working condition.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33

KV feeders: (i) Details of DISCOM wise Power supply given to various domestic categories during the period

SEPTEMBER 2020 TO NOVEMBER 2020 is enclosed at Annexure 2.3(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised

about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV

substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details

of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups

to be allocated

01

EAST

Jabalpur 14

02 Sagar 00

03 Rewa 00

04 Total 14

05

WEST

Indore 05

06 Ujjain 04

07 Total 09

08

CENTRAL

Bhopal 13

09 Gwalior 00

10 Total 13

TOTAL Grand Total 36

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.

In view of the above it is requested that the order copy for which group have been allocated may

please be submitted to P&D, MPPTCL under intimation to SLDC.

ITEM NO. 3 : OPERATIONAL PLANNNING:

Minutes of 76th OCCM of MP 3

3.1 Generating Units under planned outage and proposed maintenance program: The latest status for

annual maintenance /outages of thermal generating units of MPPGCL for FY 2020-2021 as provided by

ED(O&M:Gen) for the month OCTOBER-2020 to NOVEMBER-2020.

Details regarding hydel unit outage has not been provided by CE (O&M:Hydel), MPPGCL.

[Committee May like to note]

3.2 Proposed shutdown program of Transmission lines / Transformers: The proposed shutdown of

transmission elements for the period 01.06.2021 to 31.03.2021 as submitted by T&C, MPPTCL is enclosed as

Annexure-3.2. [Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The committee was apprised about the

status submitted by MPPGCL /MPPTCL are given below:-

Sr.

No

Line/Transformer/ etc

under long Outage

Outage date Reason Response from Utility

1

40MVA  BHEL  make transformer  Sl.  No. 2038553  at  132KV  S/S Berasiya. 

05‐03‐20 H/T  due  to  oil parameters  are  beyond acceptable limits 

Transformer charged on 09.07.2020. 

2

160MVA BBL make transformer Sl. No.   5563-02 AT 220 KV S/S Datia 

20‐07‐20 

X’mer tripped Differential & Buchholz trip indications 

X’mer replaced by another 160MVA transformer on 28.10.2020 

3

160MVA  AREVA  make Transformer  ,Sl.  No.  B‐30239  at  220KV  S/S Jaitpura (Indore‐II). 

07.02.2020 Multiple feeder fault and DC problem 

Transformer  declared  failed  and replaced by 160MVA transformer on  Dtd‐30.09.2020. 

4

220/33KV 50MVA BBL make transformer Sl. No. 5685-03 at 400KV S/s Ashta

23‐08‐20 

X’mer tripped Differential & Buchholz trip indications

X’mer replaced by another 50MVA transformer on 24.10.2020.

5

40MVA, 132/33KV ANDREW YULE X’MER S.NO.1247 AT 132KV S/S SEHORE.

30.10.2020 X’mer hand tripped after Buchholz alarm indication.

MPPTCL informer that X’mer found defective in testing and replaced by another 50MVA X’mer on 01.12.2020.

6

20MVA 132/33KV GEC X’MER AT 220KV S/S TIKAMGARH S.NO. B-24042

09.11.2020 

X’mer tripped Differential & Buchholz trip indications

MPPTCL informed that transformer found defective in testing. X’mer charged on 12

7 50  MVAR  (Make  GE)  Line Reactor  at  400KV  Sarni‐Asta Ckt‐I. 

31.03.2018 

Under outage since 

31.03.18 due to 

concentration of 

Acetylene gas. DGA test 

of transformer oil of 

reactor was carried out 

M/s  GE(T&D)  India  (OEM)  deputed their  team  on  dtd‐30.10.2019  for internal  inspection  of  reactor.  After inspection  corona  ring  of  reactor found  damage.  Tender  opened  on 07.02.2020  &  correspondence  is going  on  with  the  firm.  Presently 

Minutes of 76th OCCM of MP 4

by M/s CPRI, Bhopal.  work  is  under  progress.  MPPGCL informed that X’mer will be in service by March‐2021. 

Any transmission element/ EHV element under outage, which has not been intimated/included under

aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same.

The utility may submit the latest status.

ITEM NO. 4 : OPERATIONAL STATISTICS FROM SEPTEMBER 2020 TO NOVEMBER 2020: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units.

Annex. 4.2 Power Supply Position(Energy Balance Sheet).

POWER SUPPLY POSITION FOR THE MONTH : Sep 20

All Fig in MW

Particulars

Max Dem Met on :

10-Sep-20 AT : 09-30

Average 01-10 Sep

Average 11-20 Sep

Average 21-30 Sep

Average Monthly

STATE PEAK DEMAND MET 10103 8581 9068 7716 8432

BREAKUP :-

STATE THERMAL (Actual Gen) 1940 1125 1998 1681 1601

STATE THERMAL (RSD) Total MW

0 1812 1520 1481 1604

STATE HYDEL 1941 1905 1945 1880 1910

IPP (STATE) 164 84 165 159 136

CENTRAL SECTOR (Schedule) 3701 4171 3683 3376 3743

CENTRAL SECTOR (Surrender) 2228 2050 1358 1421 1610

IPP (INTER STATE) 2502 2347 2230 2105 2227

RAILWAY 163 165 183 188 179

RENEWABLE ENERGY 815 495 563 617 560

OTHERS -277 -93 -158 -166 -139

BANKING / PURCHASE / SALE -962 -1269 -1240 -1230 -1247

DEVIATION 15 -21 -110 -109 -80

DEVIATION (AVERAGE) Between (-603 to 742)

Between (-714 to 534)

Between (-784 to 502)

Between (-784 to 742)

ENERGY SUPPLY STATE (LU) 2185.00

Minutes of 76th OCCM of MP 5

POWER SUPPLY POSITION FOR THE MONTH : Oct 20 All Fig in MW

Particulars

Max Dem Met on : 31-Oct-20 AT :

09-15

Average 01-10 Oct

Average 11-20 Oct

Average 21-30 Oct

AverageMonthly

STATE PEAK DEMAND MET 12546 8980 9877 10334 9750

BREAKUP :-

STATE THERMAL (Actual Gen) 2954 1567 2277 2631 2174

STATE THERMAL (RSD) Total MW

0 1458 708 129 745

STATE HYDEL 1139 947 888 668 829

IPP (STATE) 458 171 275 339 264

CENTRAL SECTOR (Schedule) 3538 3413 3525 3762 3573

CENTRAL SECTOR (Surrender) 682 1237 612 1000 951

IPP (INTER STATE) 2875 2400 2555 2512 2490

RAILWAY 211 192 188 202 194

RENEWABLE ENERGY 922 679 552 498 574

OTHERS -237 -163 -268 -284 -240

BANKING / PURCHASE / SALE 634 107 341 520 329

DEVIATION -24 -61 -79 -94 -78

DEVIATION (AVERAGE) Between (-578 to 385)

Between (-727 to 447)

Between (-986 to 753)

Between (-986 to 753)

ENERGY SUPPLY STATE (LU) 2572.15

POWER SUPPLY POSITION FOR THE MONTH : Nov 20 All Fig in MW

Particulars

Max Dem Met on : 30-Nov-20 AT :

08-45

Average 01-10 Nov

Average 11-20 Nov

Average 21-30 Nov

Average Monthly

STATE PEAK DEMAND MET 14234 11136 11207 10234 10839

BREAKUP :-

STATE THERMAL (Actual Gen) 2828 2848 2530 2468 2616

STATE THERMAL (RSD) Total MW

0 144 236 236 205

STATE HYDEL 1609 426 634 634 565

IPP (STATE) 481 342 335 337 338

CENTRAL SECTOR (Schedule) 3482 3902 3979 3622 3834

Minutes of 76th OCCM of MP 6

CENTRAL SECTOR (Surrender) 509 1177 870 1211 1086

IPP (INTER STATE) 2876 2442 2427 2425 2431

RAILWAY 233 220 228 236 228

RENEWABLE ENERGY 782 439 541 720 572

OTHERS -264 -293 -284 -300 -293

BANKING / PURCHASE / SALE 2124 1377 1421 1414 1404

DEVIATION 82 -115 -167 -127 -136

DEVIATION (AVERAGE) Between (-1295 to 742)

Between (-1380 to 382)

Between (-917 to 674)

Between (-1380 to 742)

ENERGY SUPPLY STATE (LU) 2729.61

Annex. 4.3 Hourly Average of Availability and Demand.

Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

ITEM NO. 5: SYSTEM DISTURBANCE IN MP FOR SEPTEMBER 2020: The Grid

Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF

REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and

commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR Implementi

ng Agency

Expected Date of Commissioning

as intimated in last OCC

1. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

Grant for the scheme for installation of 50MVAR line reactor at Sarni-ISP feeder of 400KV switchyard of Satpura has been sanctioned by MoP, GoI on 22.05.17. After extending the dates only single offer has been received which is under evaluation.

2. Bus Reactor at SSTPS 125 MVAR MPPGCL Charged on 21.12.2020.

The latest status may be submitted in the meeting.

6.2 COLLECTION OF DATA AND INFORMATION FOR DETERMINATION OF INTER-

STATE TRANSMISSION CHARGES AND LOSSES- PROCEDURE THEREOF:- The

Minutes of 76th OCCM of MP 7

committee was apprised that as per Regulation 23(1) of the Sharing Regulations 2020, the Implementing

Agency (IA) has published detailed procedures along with data formats for collection of data and information

from Designated ISTS Customers (DICs), ISTS Licensees, Regional Load Dispatch Centers (RLDCs), State

Load Dispatch Centers (SLDCs), Central Transmission Utility (CTU) and State Transmission Utility (STUs) /

non-ISTS licensees whose assets have been approved by CERC as being used for inter-State transmission,

for Implementation of the provisions of Sharing Regulations 2020 after stakeholder consultation.

‘DIC’ means the user of any transmission element(s) of the Inter-State Transmission System (ISTS) and

shall include generating station, State Transmission Utility (STU), distribution licensee including State

Electricity Board or its successor company, Electricity Department of State and any other entity directly

connected to the ISTS and shall include an intra-State entity or a trading licensee that has obtained

Medium Term Open Access or Long-Term Access to ISTS;

DATA AND INFORMATION TO BE SUBMITTED BY ALL DICS:

All DIC’s shall submit the following data to the Implementing Agency as well as to the respective RLDCs

by 7th day of each billing month in the prescribed formats enclosed with this procedure:

(i) Basic Network data along with the network connectivity diagram corresponding to peak block (an updated

geographical power map/ single line diagram, indicating the lines which are kept open from end and bus

split arrangement (if any).

(ii) Total actual injection and withdrawal (MW and MVAr) data at various nodes or group of nodes for the

notified peak block of the billing period.

(iii) Details of long-term access and medium-term open access along with details of buyers for the billing

period

The Basic Network shall comprise of the entire electricity system, electrical plants and/ or transmission

lines at voltage levels of 110 kv and above and all the generators connected up to 110KV level

corresponding to Peak Block identified and published by IA. In the States where voltage level next to

220kv/ 230kv system is 132 kv, data of entire network up to 132kv level is to be furnished. Power flow into

a lower voltage system from the voltage levels indicated in the definition of the Basic Network shall be

considered as load at that sub- station. Power flow from a lower voltage system into the electricity

systems at the voltage levels indicated in the definition of the Basic Network shall be considered as

generation at that sub-station

If any DIC fails to submit the data as required within the stipulated time frame, IA shall compute

transmission charges based on the data available from other alternate sources as per Regulation 24(5) of

Sharing Regulations 2020.

FOLLOWING IS PROCEDURE FOR PROVIDING DATA AS DESCRIBED IN REGULATION:

In case of drawal DIC’s, total drawal of a DIC shall be computed based on SEM data for the peak

block. Where SEM data is not available, SCADA data shall be used. DIC should provide node wise data

Minutes of 76th OCCM of MP 8

as per the Regulations. Where DIC shall not provide node wise data within stipulated time period,

apportionment of loads in different nodes of DIC shall be considered in proportion to the node wise data

submitted by DIC for the most recent TTC/ATC computation PSSE base case/ recently submitted updated

base case data by the states for peak scenario.

CONSIDERING THE PROVISIONS OF REGULATION FOLLOWING PROCEDURE SHALL BE

IMPLEMENTED FOR PROVIDING DATA TO IMPLEMENTING AGENCY:

1. SLDC shall provide node wise SEMS data which are available to SLDC till 5th of every month to

nodal officer for this purpose for providing data to implementing agency. For the

injection/withdrawal nodes, for which SEMs data are not available, SLDC SCADA data shall be

provided by SLDC

2. Further, Transco SCADA data for missing withdrawal nodes shall be provided by CE(P&D) in

coordination with CE(T&C). It is also to mention that if any data is not available at SLDC &

Transco SCADA then P&D shall obtain the data from CE(T&C). This arrangement shall continue

till, MPPTCL will make arrangement to provide/communicate SEMS data of all nodes to SLDC up

to 3rd of every month. The CE(T&C) shall take initiative in war footing to make SEMS data of all

withdrawal nodes make available to SLDC up to 3rd of every months. Similarly, all generators

shall also make such arrangement. Further MPPGCL is also requested to ensure to provide

SEMS data of the generating stations to SLDC by 3rd of every month.

3. Nodal officer o/o CE(P&D) shall communicate the consolidated data to implementing agency in

prescribed format till 7th of every month.

Representative from SLDC briefed the committee about the complete procedure. It was decided

in the meeting that an Officer not below Superintending Engineer rank shall be nominated each from

offices for ensuring that the data is made available to concern officers within stipulated time period.

6.3 FREQUENT ABNORMAL OPERATIONS OF RELAYS AT TONS HPS:- The

committee was apprised that on dated 27.10.20, around 11.59 hrs, 220kv Tons- Kotar Ckt 1 tripped with

following indications:

Kotar - B-ph, Z-1, 15.9 KM, 5 KAmps

Tons HPS- B-ph, Z-1, 21 KM (As reported ckt breaker not tripped)

During the time of tripping the Bus arrangement at Tons HPS was as mentioned below: -

Bus 1- Kotar ckt 1, Rewa ckt , Unit 1

Bus 2- Kotar ckt 2, Sirmour ckt , Unit 2, 20 MVA X-mer

As reported, Bus bar protection operated at Bus 2 at Tons HPS., but from the indications and

arrangements mentioned above, it may be seen that 220kv Tons- Kotar ckt 1 was on Bus 1 in which fault was

occurred, however it is not understood that how the element situated at Bus 1 creating bus fault on another

Minutes of 76th OCCM of MP 9

bus? There may be some mal operation of protection relays and also problem in relay coordination may not be

ruled out. Similarly at 14:12HRS. on dated 26/11/2020 Bus Bar Protection operated at TONS HPS and due to

this all connected element tripped from TONS PH end without any indication..

The issue of frequent abnormal operations of relays at Tons HPS was previously raised many times,

also in letter referred above, the false trippings at Tons end and relays at Tons end sensing the faults of far

end was brought into notice. But despite this, no concreate result on the matter observed till date and the

trappings are still persisting.

These type of false trippings are dangerous to the system. It is requested to please look into the

matter and get the reason investigated, so that any mal operation can be rectified. It is also requested that

relay co-ordination may also be reviewed at Tons end and all relays at Tons HPS be tested properly.

Remedial action taken to prevent such multiple false trippings be informed to this office.

Representative from MPPGCL intimated that the process of protection coordination of EHV elements

(lines/transformers) at all Power houses is in process in coordination with CE(T&C). The matter was discussed

in the meeting.

6.4 ENABLING THE AUTO RE-CLOSURE FACILITY AT PGCIL SUBSTATION END

ON 220 KV LINES OF MPPTCL:- The committee was apprised that as per Regulation 43(4) (c) –

Schedule-V (1) (f) of CEA (Technical Standards for Construction of Electric Plants and Electric Lines),

Regulation-2010, availability and healthiness of Auto Re-closure feature must be ensured on 220 KV and

above EHV lines. However, there are 50 Nos of 220 KV lines of MPPTCL are drawing power through PGCIL

network for catering consumers load of MP, PGCIL has not enabled/ provided Auto Re-closure facility at their

end on 26 Nos of 220 KV lines. Whereas MPPTCL has provided Auto Re-closure facility on all the 26 Nos of

220 KV lines at MPPTCL end (list enclosed). As, MP is drawing 50% to 70% its requirement from the drawl

point located in PGCIL network. Non availability of Auto Re-closure facility at PGCIL end makes the State Grid

vulnerable.

This matter has already been discussed during 537th OCCM of WR. Representative of PGCIL has agreed to

provided Auto Re-closure facility at their end and requested to advice MPPTCL for pursuing the matter with

concern PGCIL substations for making arrangement for providing Auto Re-closure feature at PGCIL end &

ensured that PGCIL shall do needful in the issue. Considering the above, CE -T&C is requested to instruct

respective circles for taking up the matter with PGCIL Sub-Stations for enabling the Auto re-closure facility at

PGCIL substation end on 220 KV lines of MPPTCL.

In view of above Members of Sub -Committee has discussed the matter and representative of o/o

CE (T&C) was requested to peruse the matter with respective PGCIL substations so that Auto re-closure

facility may be enabled at PGCIL substation end on 220 KV lines of MPPTCL

CE(T&C) was requested to provide the updated status of the Auto Re-closure schemes within 15 days to

SLDC. The matter was discussed in the meeting.

Minutes of 76th OCCM of MP 10

6.5 ABSORPTION / INJECTION OF REACTIVE POWER BY GENERATORS: - The

committee was apprised that during the less system demand period the voltage profile is expected to be high.

The problem of high voltages becomes severe during night/off peak hours. It is therefore desired that

generating stations to ensure absorption of reactive power from grid with their capability curve to maintain

voltages within operational limit whenever the necessity arises. Similarly, voltage profile is expected to below

due to high system demand, it is desired that generating stations to ensure injection of reactive power from

grid with their capability curve. Similarly, reactors / capacitors shall be switched on/off as per requirement.

The matter was discussed in the meeting.

6.6 UPLOADING OF TRIPPING ON WRLDC TRIPPING PORTAL:- The committee was

apprised that as intimated by WRLDC in 529th WR-OCCM, that WRLDC has started a tripping portal from

01.06.2019 for uploading FIR, DR/EL and other details related to the tripping of all 400KV elements, important

grid elements, inter-state/inter-regional links and lines connected to PGCIL. Further details major Grid

Disturbance resulting in significant load loss/generation loss is also required to be uploaded on the WR-Portal

and as per IEGC 54.2(r), utilities need to submit the data within 24 hours of the event. The link

(https://portal.wrldc.in/Trippingnew/Account/Login.aspx), common user ID & password for the entities of MP

has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019.

As advised in 537th WR-OCCM, all Utilities are requested to use and submit the data through the

WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details

related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within

stipulated time.

The matter was discussed in the meeting.

6.7 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE

ELEMENTS:- The committee was apprised that in compliance to the IEGC & WRLDC operating procedure

the protection coordination of the existing elements & adjacent substations shall be prior to integration of new

intra state elements. All the concerned entities are requested to ensure/review the protection coordination of

adjacent substations/elements and confirm the same along with the first-time charging documents for intra

state elements also.

The matter was discussed in the meeting.

6.8 STATUS OF 125 MVAR SWITCHABLE BUS CUM LINE REACTOR AT 400 KV S/S

SAGAR: - The committee was apprised that the 125 MVAR switchable bus cum line reactor at 400 KV S/s

Sagar was commissioned and first test charge at 00:41Hrs. on 04.03.2020 as Bus reactor. Thereafter the

reactor was switched OFF at 01:23Hrs./04.03.3030 due to non-availability of requisite approval of Standing

Committee.

In the above matter it is to mention that during the summer/rainy season/low load season the voltage

of the system was high and during the prevailing high voltage at Sagar the proposal for taking the 125MVAR

Minutes of 76th OCCM of MP 11

reactor at 400KV S/s Sagar in service was sent to WRLDC. But due to non availability of requisite Standing

Committee approval the charging of the reactor was not permitted by WRLDC.

In view of the above P&D, MPPTCL is requested to provide the status of approval of standing

Committee for 125MVAR Bus cum line reactor so that the reactor may be taken in service as per the system

requirement. It is also requested to clarify that the reactor will be used as a bus reactor or line reactor or can

be used as both in accordance to the Standing Committee approval. Moreover, it may also be clarify when 125

MVAR reactor shall be used as Bus reactor, at the same time whether 400 kv Sagar -Satna line shall be

available or required to be kept off.

P&D informed that the matter is being taken up with CEA. Further SLDC stated that the issue shall be

resolved on priority basis.

6.9 ROSTERING OF IRRIGATION LOAD (PLAN FOR LOAD MANAGEMENT):‐  The

committee was apprised that for load management purpose and for providing quality supply to irrigation

consumer rostering of 11KV feeder are being done by Discom. In this context during this rabi season flexi plan

has been implemented by bifurcating irrigation load in 3 groups. The loading of few s/s has been recorded

significantly high in the range of 90% and above the details are enclosed as Annexure-6.9. Considering the

loading of the transformer discoms are requested to implement flexi plan such that loading of the transformer

remains within permissible limit.

Committee was informed that in Central Discom the loading of Bina & Gwalior area increases

abnormally after 16:00 Hrs. which is the ICT’s of Bina, Gwalior & Morena-Adani are overloaded. The CE (T&C)

has also shown concern regarding over loading of Transformer in few pockets.

Member Secretary OCC stated that if any Discoms is making any changes in supply plan then it shall

be done in coordination with transmission so as to avoid any overloading/disturbance in EHV network.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS:

Black Start mock drill of Hydel stations of MP:- The committee was apprised that during 2020-2021 Black

Start Mock Drill at Bargi HPS & Birsinghpur HPS has been conducted successfully on dtd- 15.12.2020 &

21.12.2020 respectively.

The proposed / tentative dates for conducting black start mock drill at various Hydel power station of

MP is detailed as mentioned below:-

S.NO. NAME OF HPS PROPOSED/TENTATIVE DATE

OF MOCK DRILL

1. PENCH HPS 24.12.2020

2. RAJGHAT HPS 05.01.2021

3. MADIKHEDA HPS 06.01.2021

4. TONS HPS 12.01.2021

5. ISP HPS DATES FOR MOCK DRILL MAY

Minutes of 76th OCCM of MP 12

6. OSP HPS

BE PROPOSED BY NHDC FOR

THE MONTH OF MARCH 2021.

COMMITTEE MAY LIKE TO

DISCUSS.

ITEM NO. 8: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 PROVIDING METER DATA TO NLDC FOR COMPUTATION OF INTER STATE

TRANSMISSION CHARGES & LOSSES:- SLDC representative informed that CERC has notified

(Sharing of Inter State Transmission Charges & Losses) Regulations, 2020 dated 04th May 2020 which has

come into force from 01st November 2020. In compliance of regulations, NLDC computes Inter State

transmission charges and losses every month for which node wise injection & drawal recorded in ABT meters

at a particular block in previous month is required to be provided by SLDC prior to 7th of every month. In

compliance of CERC regulations, all Intra State entities of MP are required to carry out folling activities-

1. All state entities shall ensure that at inter-face meters installed under their jurisdiction, AMR facility is

provided for data downloading at SLDC and should be functional at all the time. Any new Inter-face

meter installed in future, shall be capable of transmitting data to SLDC through AMR system installed at

SLDC.

2. In case of some of the meter’s data is not received through AMR, the state entity shall manually

download the data and send through e-mail [email protected] within one day on request of

SLDC.

3. All state entities shall furnish injection / drawal JMR data on 2nd day of every month through e-mail

[email protected] to SLDC for checking / verification / assessment of meter data.

4. All the Intra State entities are requested to instruct the nodal officers appointed for providing data to

SLDC to furnish the missing meter data within one day and JMR data by 2nd day of every month.

SLDC representative requested to MPPTCL, MPPGCL, Discoms, NHDC, IPPs and Railway to issue

necessary instructions to concerned officials for compliances of above regulatory provisions.

8.2 TESTING & CALIBRATION OF METERS AND TIME DRIFT IN ABT METERS

INSTALLED AT THE INTERFACE POINTS:-

1. SLDC representative requested CE(T&C) office to apprise about the status of testing / calibration of

interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of

meter) Regulation 2010 to the committee and request made by SLDC vide U.O. note no. 195 dated

11.11.2020. CE(T&C) office representative informed that first replacement of ABT meter which are older than

Minutes of 76th OCCM of MP 13

10 years shall be carried out and thereafter meters testing / calibration of balance interface meters shall be

carried out by MPPTCL.

2. SLDC representative informed that the list of ABT meters installed at the interface points of T-D having

time drift has been sent to CE(T&C) Office vide email dated 16.03.2020 & UO note no. 191 dated 29.10.2020

and requested to take up the matter with M/s Secure Meters Ltd. for time synchronization with GPS. However,

till date meters are not time synchronized with GPS. CE(T&C) office is requested to apprise the status of time

synchronization of meters. CE(T&C) office representative informed that letter No 04/04/TC-AMR/3985 dated

18.03.2020 is issued to M/s Secure Meters Ltd., Udaipur for time synchronization in ABT meters installed at

the interface points and CE(T&C) office is also issuing instructions to field offices for time synchronization in

coordination with M/s Secure Meters Ltd.

8.3 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM

AND JMR:- No representative of Railways has attended the meeting. SLDC representative requsted

CE(T&C) office to issue instructions to field offices for providing load survey data of 22 Nos. ABT meters

installed at TSS end which are not communicating with SLDC AMR system in coordination with Railways.

8.4 NON- RECEIPT OF ABT DATA OF ISP AND OSP THROUGH AMR SYSTEM:- SLDC

representative informed that ABT meter data of ISP & OSP HPS is not being received through AMR system

since last 3-4 months. ISP & OSP were requested to coordinate with M/s Secure Meters Ltd. (Contact Person

– Shri Abhishek Yadav M- 8120320576) for integrating the meters with AMR system of SLDC,however the

issues are not resolved so far. ISP & OSP representative informed that they will coordinate with M/s Secure

Meters Ltd. and SLDC for resolving the problems related with downloading of meter data through AMR system

of SLDC.

8.5 NON- RECEIPT OF JMR DATA OF JP BINA POWER HOUSE:- SLDC representative

requested to JP Bina TPP to furnish the JMR data in the format enclosed as Annexure-I of ABT meters

installed at GT-I & II, ST-I&II and outgoing feeders by 2nd day of every month for checking / verification of

meter data. JP Bina representative assured that JMR data in standard format shall be furnished to SLDC by

2nd day of every month.

8.6 PROVIDING AMR FACILITY AT GT-I & II, ST-I AND NON- RECEIPT OUTGOING

FEEDERS ABT DATA OF THROUGH AMR SYSTEM OF BLA POWER HOUSE:-No

representative from BLA Power Pvt. Ltd. has attended the meeting, therefore issue could not be discussed.

Minutes of 76th OCCM of MP 14

8.7 TESTING & CALIBRATION OF INTERFACE METERS AND MISMATCH IN

GENERATION OF OUTGOING FEEDERS AND GT &ST:-

1. SLDC representative informed that it was already requested in the previous OCCMs to MPPGCL to

conduct testing / calibration of main, check and standby meters installed at the interface points of power

stations as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of

meter) Regulation 2010. He requested MPPGCL to apprise the Committee about the status of Testing /

Calibration as per regulatory provisions and to ensure that meters installed at the interface points are

time synchronized with GPS. MPPGCL representative informed that Pench HPS testing / calibration of

main energy meter work is completed & Bargi HPS order is under process and assured to conduct the

testing / calibration of meters installed at other Hydel Power Stations and check meters of Thermal

Power Stations. MPPGCL informed that meters installed at the Thermal Power Stations has already

been tested / calibrated. Further, MPPGCL assured to conduct time synchronization of all meters with

GPS.

2. SLDC representative informed that meter installed at outgoing feeder of Birsinghpur, HPS do not record

correct generation due to incorrect measurement of current in one phase since April-2020. MPPGCL

representative informed that order has been placed for replacement CT and replacement shall be done

in next month.

8.8 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF WIND POWER

PROJECTS FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT:- SLDC

representative informed that the concerned SE(O&M)’s do not furnish the monthly injection data of the

following Wind / Solar Power Projects connected at 33KV level. However, SLDC is incorporating the injection

data recorded in ABT meter in SEA, but, verification of data could not be done.

i) 25MW Solar Power Project of M/s Walwahan solar MP connected at 132KV Ratangarh.

ii) 25MW Solar Power Project of M/s Deligentia Energy & Infra connected at 132KV Ratangarh.

iii) 15MW Wind Power Project of M/s Dhar Wind Power Projects Pvt. Ltd. connected at 33KV Dashera

Maidan.

iv) 15MW Wind Power Project of M/s Tirupati Dhar Renewable Power Pvt. Ltd. connected at 33KV Jaitpura

Dhar.

No representative of DCC, Indore has attended the meeting, therefore issue could not be discussed.

Further, SLDC representative inform that the JMR injection data of the following wind & solar

generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC

consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data

could not be done.

i) 49.5MW Wind Power Project of M/s Betul Wind Farm connected at 132KV Gudgaon.

ii) 46MW Wind Power Project of M/s Kukru Wind Farm Pvt. Ltd. connected at 132KV Gudgaon.

Minutes of 76th OCCM of MP 15

iii) 51MW Solar Power Project of M/s Renew Clean Energy P Ltd. connected at 132KV Kohtiya.

SLDC requested CE(T&C) office to issue necessary instructions to field offices for furnishing the JMR data

of the above RE Projects. CE(T&C) office have assured to issue instructions to field offices for furnishing the

JMR data of above mentioned RE Projects by 3rd or 4th of every month connected at 132KV level and above.

8.9 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND

AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC

representative stated that ABT meters installed at the following Pooling Stations of Wind and Solar Power

Project has time drift and thus not recording the correct data. SLDC has requested to QCA / Generators with

copy to concerned licensee vide letter no. 809 & 810 dated 03/06/2020 for time synchronization of the ABT

meters with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC.

Sr. No. FEEDER NAME SUBSTATION ABT METER ZONE

TIME DRIFT

(in minutes)

1 33 KV UJAAS 1 SUSNER 132 KV SUSNER XB571653 WZONE 225.00

2 33 KV SHANKHESWAR WIND

WORLD (DHAMNAR) 220KV S/s DALODA

XC525575

WZONE 180.00

3 33 KV SHANKHESWER WIND

WORLD(NAGRI) 220KV S/s DALODA

XC525573

WZONE 180.00

4 33 KVGIRIRAJ ENTERPRISES,

AFJALPUR 33/11KV S/s AFJALPUR

XC502289

WZONE 180.00

5 33 KV SUDHEER PROJECTS PVT

LTD, BERCHA 132KV S/S BERCHHA

XC529837

XC529839 WZONE 180.00

6 33 KV SUDHEER PROJECTS PVT

LTD MAXI 132KV S/S MAXI

XC529834

XC529832 WZONE 180.00

7 33 KV RENEW WIND ENERGY (MP

TWO) PVT LTD DALODA 220KV S/s DALODA XB593636

WZONE

54.00

8 132 KV GLOBUS STEEL_N_

POWER PVT LTD 132KV S/s SITAMOU

XC562469

WZONE

45.00

9 132 KV RENEW SOLAR ENERGY

(TN) PVT. LTD. 132KV S/S VIJAYPUR

MPC68357

WZONE

26.00

Minutes of 76th OCCM of MP 16

10 33 KV DELIGENTIA CKT-I 132KV S/S RATANGARH

MPC72366

WZONE

25.00

11 33 KV DELIGENTIA CKT-II 132KV S/S RATANGARH

MPC72365

WZONE

21.00

12 33 KV INOX WIND INFRA BETUL

132KV S/S GUDGAON

XB570699

CZONE

19.00

13 220KV INOX LAHORI FEEDER II 220KV S/S SHAJAPUR

MPC73530

WZONE

18.00

14 132 KV ORANGE BERCHA WIND

POWER PVT LTD 220KV S/S BARNAGAR

XC576471

WZONE

17.00

15 33 KV VIVAAN SOLAR -2 MAKDON

132KV S/S MAKDON

XC529587

WZONE

17.00

16 132 KV WIND WORLD (INDIA) LTD.,

RATADIA HILL AT BAGDI III 132 KV JAORA

MPE53467

WZONE

17.00

17 220KV MARUTSHAKTI FEEDER-I

220KV S/S NIPANIYA

MPC70479

WZONE

16.00

18 132KVGAMESA WIND

FATANPUR-II 220KV S/S DEWAS

XC548502

WZONE

14.00

19 132 KV M/s WAANEEP Solar Pvt. Ltd

132KV S/S ICHHAWAR

XC502683

WZONE

14.00

20 132KV GAMESA FEEDER I

220KV S/S SHAJAPUR

XB587800

WZONE

13.00

21 33 KV FINSURYA SOLAR ENERGY

(10MW) 132KV S/S MAKDON

XB581186

WZONE 12.00

22 220KV INOX_LAHORI FEEDER I

220KV S/S SHAJAPUR

MPC73532

WZONE 12.00

23 132KV GAMESA WIND

FATANPUR-I 220KV S/S DEWAS

XC548500

WZONE 12.00

24 220KV MARUTSHAKTI FEEDER-II

220KV S/S NIPANIYA

MPC70481

WZONE 11.00

25 33KV KSHEMA_BHERUGARH

FEEDER-I 132KV S/S BHERUGARH

XD500608

WZONE 10.00

Minutes of 76th OCCM of MP 17

26 33KV DHAR_WIND FEEDER

33/11KV S/S

_DUSSERA_DHAR XD500602

WZONE 10.00

27 33KV KSHEMA_BHERUGARH

FEEDER-II 132KV S/S BHERUGARH

Y0056943

WZONE 9.00

28

132 KV KUKRU WIND 132KV S/S GUDGAON

XC579525

CZONE 9.00

29 33 KV CHOKSI ENERGY & INFRA P

L RINGDOD 132 KV JAORA

Y0056961

WZONE

8.00

30 220 KV CLEAN WIND POWER

(RATLAM) PVT LTD 220KV S/S RAJGARH

MPC74061

WZONE

8.00

31 33KV TODAY CLEAN ENERGY

FEEDER-1 220KV S/S BAROD

Y0116481

WZONE

7.00

32 33KV CHOKSI ENERGY

MAMATHKHEDA

132KV S/S JAORA Y0056963 WZONE 6.05

33 BETUL WIND FARM

132KV S/S GUDGAON MPC62876 CZONE 5.53

34 UJAAS-2 RAJGARH (BIORA)

132KV S/S RAJGARH XC595281 CZONE 5.28

35 33KV DURGA KHANDSARI 132KV S/S PANSEMAL

XD520954 WZONE 5.15

36 132KV RAJKOT_GUJRAT

220KV S/S BAROD XD537568 WZONE 3.80

37 33KV AVP POWER INFRA

FEEDER-II _

132KV S/S SONKATCH

XD595994 WZONE 3.52

38 UJAAS-1 RAJGARH (BIORA) 220KV S/S RAJGARH

BIAORA Y0356649 CZONE 3.48

39 ACME SOLAR ENERGY PVT. LTD 132KV S/S KHILCHIPUR

MPC60957 WZONE 3.40

40 NTPC-1 220KV S/S RAJGARH

BIAORA XC510612 CZONE 3.32

41 NTPC-2 220KV S/S RAJGARH

BIAORA XC510614 CZONE 2.93

Minutes of 76th OCCM of MP 18

42 SKY POWER SOLAR INDIA PVT

LTD

400KV S/S CHHEGAON

MAKHAN Y0322111 WZONE 2.78

43 33 KV FREEWINGS POWER &

INFRA LTD

132KV S/S MAKDON

Y0505422 WZONE 2.57

44 BHARAT ELECTRONICS LTD OFI 220KV S/S ITARSI

Y0510858 CZONE 2.37

45 33KV RENEW_WIND AP4 FEEDER-I 132KV S/S KHACHROD

XD500612 WZONE 2.33

46 33KV RENEW_WIND AP4 FEEDER-

II

132KV S/S KHACHROD

XD500615 WZONE 2.27

47 33KV M P WIND FARM NAGDA HILL 220 KV DEWAS

XE525393 WZONE 2.07

48 FOCAL ENERGY SOLAR ONE INDIA

PVT LTD. (SECI)

132KV S/s SITAMOU

XA110207 WZONE 2.03

49 33KV G.I. POWER

220 KV DEWAS X1071843 WZONE 1.82

50 33KV RENEW WIND ENERGY (MP

TWO) DALODA 220 KV S/s DALODA XC522563 WZONE 1.82

51 AVENGERS SOLAR PVT LTD 132KV S/S SUWASARA

Y0357689 WZONE 2.12

52 132KV GAMESA FEEDER II 220KV S/S SHAJAPUR

XE565677 WZONE 2.12

53 SUNPHARMA POWER BLOCK-6 132KV S/S TARANA

Q0287970 WZONE 2.00

54 220KV DJ ENERGY FEEDER_I 220KV S/S DALODA

XB587788 WZONE 1.47

55 SIMCON FEEDER -2 132KV S/S GANJBASODA

Y0327309 CZONE 1.47

56 33KV UJAAS SAI SABURI 132KV S/S MAKDON

X0888531 WZONE 1.42

57 33KV DESIGNCO 132KV S/S ARNIAKALA

Y0351366 WZONE 1.42

Minutes of 76th OCCM of MP 19

58 33 KV UJAAS-1 BAROD

220KV S/S BAROD XE525398 WZONE 1.32

59 33 KV SUZLON INFRA BEHAPUR-1 220 KV S/s DALODA

XE479862 WZONE 1.32

60 33KV BHARAT ELECTRONICS LTD

VFJ JABALPUR 132KV S/S VFJ Q0238278 EZONE 1.32

61 33 KVBHARAT ELECTRONICS LTD

GCF 33KV SATPULA Q0289517 EZONE 1.30

62 SEI SUNSHINE FEEDER-1 220KV S/S SHIVPURI

Q0289279 CZONE 1.30

63 33 KV UJAAS-2 BAROD

220KV S/S BAROD XE525399 WZONE 1.27

64 SUZLON DEV 1 NAGDA HILL

DEWAS

220 KV DEWAS

XE479868 WZONE 1.20

65 SUNPHARMA POWER BLOCK-1

(Inter)

132KV S/S TARANA

Q0287966 WZONE 1.20

66 33 KV WELSPUN CKT-I 132KV S/S RATANGARH

Q0234478 WZONE 1.17

67 33 KV WIND WORLD-I AGAR

132KV S/S AGAR Q0287979 WZONE 1.17

68 220KV DJ ENERGY FEEDER_I 220KV S/S DALODA

XB587789 WZONE 1.15

69 SUNPHARMA POWER BLOCK-2

(Inter)

132KV S/S TARANA

Q0287960 WZONE 1.12

70 SUNPHARMA POWER BLOCK-4 132KV S/S TARANA

Q0287964 WZONE 1.10

71 SUNPHARMA POWER BLOCK-5 132KV S/S TARANA

Q0287968 WZONE 1.08

72 33 KV SUZLON IV RATLAM

132KV S/S JAORA XE479859 WZONE 1.02

73 33 KV SUZLON III SAILANA 14.1MW

132 KV SAILANA XE479855 WZONE 1.00

Minutes of 76th OCCM of MP 20

Further, SLDC representative informed that ABT meters installed at the following Wind and Solar

Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise

data do not match with midnight data. SLDC has requested to Generators with copy to concerned licensee

vide letter no. 2353 dated 31/08/2019, letter no. 2771,dated 16/10/2019 and letter no. 809 & 810 dated

03/06/2020 for immediate replacement of these ABT meters.

Sr.No. FEEDER NAME SUBSTATION ABT METER No. ZONE QCA NAME

1 33KV SUZLON-I

SAILANA 132 KV SAILANA

XE479853

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

2 33KV SUZLON-II

SAILANA 132 KV SAILANA

XE479854

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

3 33KV SUZLON-III

SAILANA 132 KV SAILANA

XE479855

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

4 33KV SUZLON-I

RATLAM 132KV S/S JAORA

XE479856

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

5 33KV SUZLON- IV

RATLAM 132KV S/S JAORA

XE479859

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

6 33KV SUZLON- V

RATLAM 132KV S/S JAORA

XE479860

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

7 33KV SUZLON-IV

AGAR 132KV S/S AGAR

XE479864

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

8 33KV SUZLON-V

(SUSNER-III) 132KV S/S SUSNER

XE479867

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

9 33KV SUZLON-III

(AGAR- I), 132KV S/S AGAR

XE479863

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

10 33KV SUZLON

BEHAPUR DALODA-I220 KV S/s DALODA

XE479862

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

11 33KV SUZLON

BEHPUR DALODA-II 220 KV S/s DALODA

XE479861

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

12 33KV SUZLON I

(SUSNER-I), 132KV S/S SUSNER

XE479866

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

Minutes of 76th OCCM of MP 21

13 33KV SUZLON I

(SUSNER-II), 132KV S/S SUSNER

XE479865

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

14 33 KV M P WIND

FARM NAGDA HILL 220 KV DEWAS XE525393

WZONE MANIKARAN

ANALYTICS LTD..

15 33 KV SUZLON

GUJRAT WIND PARK220 KV BAROD

XD595984

XD595980

WZONE MANIKARAN

ANALYTICS LTD...

16 33KV FREEWING

POWER PVT. LTD. 132KV S/s MAKDON Y0505422

WZONE FREEWING POWER

LTD.

17 33KV AVP POWER

PVT. LTD. 132 S/s SONKATCH

XD595991,

XD595994

WZONE MANIKARAN

ANALYTICS LTD..

18. 33KV BADONI PVT

LTD. 132KV S/s MAXI XD522128

WZONE MANIKARAN

ANALYTICS LTD..

19. 33KV GI POWER PVT.

LTD. 220KV S/s MAKDON X1071843

WZONE KREATE TECHNOLOGY

PVT LTD

20. 33KV SAI SABURI

MAKDON 132KV MAKDON X0888531

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

21. 33KV UJAAS-I

RAJGARH 220KV RAJGARH Y0356649

CZONE MANIKARAN

ANALYTICS LTD..

22. 33KV UJAAS –I

BAROD 220KV BAROD XE525398

WZONE MANIKARAN

ANALYTICS LTD..

23. 33KV UJAAS –II

BAROD 220KV BAROD XE525399

WZONE MANIKARAN

ANALYTICS LTD..

24. 33KV FRIEND SALT

SUSNER 132KV SUSNER

X0888530

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

25 SUZLON DEV 1

NAGDA HILL DEWAS

220 KV DEWAS

220 KV DEWASXE479868

WZONE RECONNECT ENERGY

SOLUTION PVT LTD

26. 33KV EASTMAN

INTERNATIONAL PVT.

LTD

132KV TARANA X1305766

X1305767

WZONE MANIKARAN

ANALYTICS LTD..

27. 33KV UJAAS-I

RAJGARH 220KV RAJGARH Y0356649

CZONE MANIKARAN

ANALYTICS LTD..

28. SIMCON FEEDER -2

220KV GANJBASODA

Y0327309

CZONE KREATE

TECHNOLOGIES LLP

Minutes of 76th OCCM of MP 22

SLDC representative requested to DDCs, Bhopal to take-up the issue with concerned officials for time

synchronization and replacement of ABT meters. DCCs Bhopal has informed that concerned nodal officer /

SE(O&M) / Commercial Section have been intimated for necessary action. No representative from DCC,

Indore has attended the meeting, therefore issue could not be discussed.

8.10 TESTING & CALLIBRATION OF INTERFACE METERS:- SLDC representative requested

to DCCs, Bhopal to take-up the matter with concerned officials for testing / calibration of meters installed at the

interface points of Renewable Energy Generators and Inter Discom feeders under their jurisdiction as per

Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010.

In response, DCC Bhopal representative informed that concerned officers have already been informed for

necessary action. DCC, Indore representative has not attended the meeting, therefore issue could not be

discussed.

8.11 INTRODUCTION OF G-TAM PRODUCT BY POWER EXCHANGE:- SLDC representative

apprise the Committee that the Green-Term Ahead Market (G-TAM) in electricity launched by Power

Exchange as a first step towards greening the Indian short term power market, it is an alternative

new model introduced for selling off the power by the renewable developers in the open market

without getting into long term PPAs.

Key features of GTAM:

1. Transactions through GTAM will be bilateral in nature with clear identification of

corresponding buyers and sellers, there will not be any difficulty in accounting for Renewable

Purchase Obligations (RPO).

2. GTAM contracts will be segregated into Solar RPO & Non-Solar RPO as RPO targets are

also segregated.

3. Daily & Weekly Contracts – Bidding will take place on MWh basis.

4. Price discovery will take place on a continuous basis, price time priority basis.

Subsequently, looking at the market conditions open auction can be introduced for daily &

weekly contracts.

5. Energy scheduled through GTAM contract shall be considered as deemed RPO compliance

of the buyer.

Significance and benefits of GTAM:

1. The introduction of GTAM platform would lessen the burden on RE-rich States and

incentivize them to develop RE capacity beyond their own RPO.

2. This would promote RE merchant capacity addition and help in achieving RE capacity

addition targets of the country.

Minutes of 76th OCCM of MP 23

3. GTAM platform will also lead to increase in number of participants in renewable energy

sector.

4. It will benefit buyers of RE through competitive prices and transparent and flexible

procurement.

5. It will also benefit RE sellers by providing access to pan- India market.

8.12 RPO OBLIGATION SETTLEMENT THROUGH RE-DSM POOL ACCOUNTS:- SLDC

representative apprise the Committee about the RPO Obligation Settlement as per MPERC (Forecasting,

Scheduling and Deviation Settlement Mechansim and related matters of Wind and Solar Generating Stations)

that “inter-state wheeling transactions of Wind and Solar Generating stations as State Entities, for balancing of

deemed renewable purchase obligation (RPO) compliance of buyers with respect to schedule, deviations by

all wind and solar generators which are state entities shall first be netted off for the entire pool on a monthly

basis and any remaining shortfall in renewable energy generation must be balanced through purchase of

equivalent solar and non-solar Renewable Energy Certificates (RECs ), as the case may be, by SLDC or

agency maintaining the pool account by utilizing funds from the Pool Account. For positive balance of

renewable energy generation, equivalent notional RECs shall be credited to the DSM Pool and carried forward

for settlement in future”.

ITEM NO. 9: SCADA and E&T RELATED ISSUES 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS &

132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR

HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS:- SLDC informed that the telemetry

integration of all the substations of MPPTCL planned to be integrated at SLDC has been successfully

completed.

SLDC further informed that telemetry of Birsinghpur HPS and Zinna HPS is not available and same

needs to be provided by MPPGCL. MPPGCL informed that telemetry integration of Birsinghpur HPS and Zinna

HPS will be completed by 1st March. In response SLDC, MPPTCL requested to expedite the commissioning

and arrange commissioning of telemetry on priority basis. SLDC also informed to MPPGCL that since

commissioning of all other HPS telemetry is completed, the commissioning of telemetry of Zinna and

Birsingpur may be taken up immediately and arrange to be completed by January end. Further, SLDC

requested MPPGCL to arrange for planning & testing of communication links before commissioning of

telemetry.

9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS:- SLDC informed that in substations having

DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This

results in wrong Bus Voltage in case of outage of transformer.

Minutes of 76th OCCM of MP 24

SLDC informed that extension of Bus Voltage through separate MFM is still pending for 400 KV

Badnawar, 400 KV Chhegaon, 400 KV Kirnapur, 400 Katni & 400 KV Pithampur.. MPPTCL informed that

earlier the issue was observed only at 400 KV S/s Badnawar as the panel commissioning work was not

completed & the telemetry of 400 KV Bus would also be available even during the outage in transformer

through which the telemetry has been extended. SLDC thus requested MPPTCL to arrange for testing of the

same in any one substation of MPPTCL. MPPTCL informed that they will arrange for testing in 400 KV

Badnawar S/s.

9.3 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED

VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS:- SLDC informed

that various telemetry discrepancies are pertaining to MPPTCL & MPPGCL are pending since long time & are

detailed below:-

(a) MPPGCL Generating Substations :-

1. Satpura TPS :-

2. SGTPS :-

3. Gandhi Sagar HPS :- Restoration of the telemetry of Gandhi Sager HPS through wideband

equipment: - SLDC informed that RTU replacement work at Gandhisagar HPS has been completed in the

Sr.No. Description Unit Pending

since

MPPGCL

response in

meeting

dtd.30.10.18

MPPGCL response in 75th OCCM

1 400 KV Satpura -

Itarsi

MW 10 months - SLDC informed that in last OCCM

meeting, it was informed by MPPGCL that

new transducer of higher accuracy class

i.e. 0.2 S are being purchased to rectify the

issues, however no progress in the matter

has been observed and the issues still

persist. SLDC requested MPPGCL to take

up the matter on highest priority. MPPGCL

informed that they will arrange for the

same at the earliest.

2 400 KV Satpura-

Koradi

MW 10 months -

3 400 KV Satpura-

Seoni

MW 10 months -

Sr.No. Description Unit Pending

since

MPPGCL response in meeting

dtd.30.10.18

MPPGCL response in

76th OCC

1 220/33 KV

Transformer

MW/MVA

R

More than

one year

MPPGCL informed that it shall be

provided within one month.

MPPGCL informed that it

will be rectified at the

earliest.

Minutes of 76th OCCM of MP 25

month of November 2020. However, CB of Gen No 5 and MW, MVAR of 33 KV feeder Kuakheda and

Bhanpura has still not been provided. MPPGCL informed that the cabling work is pending to be completed

& will be completed at the earliest.

(b) Transmission/ other Generating Substations :-

Sl

No. Name of Substation Name of feeders/transformers

01 400 ISP

SLDC informed that following issues pertaining to ISP

are pending to be completed :-

(i) Isolator of Transfer bus is still not available –

ISP informed that issue will be resolved at

the earliest.

(ii) MW of 400 KV Indore feeder 1 is showing

wrong value.- ISP informed that the issue will

be resolved after replacement of transducers

with higher accuracy class (0.2 S).

(iii) (iii) Telemetry of power plant is not updating

properly/update with time delay. The

Generation values stops updating properly and

while non updation, no non update tag is

appeared some time- ISP informed that issue

will be resolved at the earliest.

02 400 KV Julwaniya CB status of 132/33 KV Xmer is showing open.

This problem is persisting since last 8 months. No

action in the matter has been taken.

03 220 KV Nimrani Telemetry of 33 KV Maral is to be provided

04 220 KV Ratlam 220 KV TBC CB faulty

MPPTCL informed that telemetry discrepancies pertaining to MPPTCL S/s will be resolved at the

earliest.

9.4 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that

extension of RGMO/FGMO signal of following generating units is still pending:-

S.No. Name of Generating

Station

Unit.No. MPPGCL response in last OCC

Minutes of 76th OCCM of MP 26

1 SGTPS 1,2,3,4 SLDC informed that it was intimated by MPPGCL in

last three OCC meetings that integration work of

RGMO/FGMO signal is under tendering process &

telemetry integration of RGMO/FGMO signal shall be

completed within 3-4 months. However no progress in

the matter has been observed even after lapse of 1

year period. MPPGCL informed that it will be

completed at the earliest.

2 BARGI HPS 2 SLDC informed that integration of RGMO/FGMO

signal at Bargi HPS shall be done during AOH of units

in 2019. However no progress in the matter has been

observed. MPPGCL informed that the integration of

RGMO/FGMO signal will be done during the next

planned outage in unit within 25 days.

3. Singha ji Phase 2 3, 4 MPPGCL informed that matter has been taken up

with L&T to initiate the work at the earliest & the

integration work will be done when the units will be

taken on operation.

9.5 REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:- SLDC informed that

the RTUs installed at Thermal & Hydel power stations for providing real time data to SLDC has completed

their life and giving problems in expansion of telemetry & maintence of RTUs. As, replacement of RTUs

required sufficient time, the matter of replacement of RTUs at power stations was taken up by SLDC since

2018. The replacement of RTUs of hydel power stations is under progress. However, no progress regarding

replacement of RTUs of thermal power stations is observed.

The matter was taken up by SLDC in various OCCM meetings as well as in separate SCADA and

communication meetings held with power station officers. However, no progress is observed. In response it

was informed by MPPGCL representative that in place of arranging replacement of RTUs, MPPGCL is

exploring the possibility of integrating the telemetry of thermal Power Stations through existing SCADA system

at Power stations. SLDC enquired regarding availability of IEC 60870-5-101 gateway in SCADA and protocol

compatibility with SLDC.As no information is provided by MPPGCL, SLDC suggested MPPTCL to immediately

arrange testing for compatibility of SLDC SCAAD system with power station SCADA. MPPGCL informed that

they will arrange for the same within a month.

9.6 NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC

TO THERMAL/ HYDEL POWER STATIONS:- It is to inform that as per CERC communication

Minutes of 76th OCCM of MP 27

regulation 2017, availability of communication channel is required to be ensured more than 99.9%. However,

despite constant pursuance, presently most of the PLCC voice communication of various power stations to

SLDC is out since long time and detailed of non-availability as here under: -

Sr.No Name of

HPS/TPS

2 wire PLCC

channel

MPPGCL response in meeting

dtd.30.10.18

Remark

1.

Bansagar- IV

PLCC voice

communication is not

established

AE, Tons HPS informed that he will

visit Bansagar-IV for restoration of

voice communication of Bansagar-IV

at the earliest.

Restoration of PLCC

channel is still

pending.

2.

Madikheda

PLCC voice channel

is not working since

long time.

Restoration of PLCC

channel is still pending

.

3

Birsinghpur HPS

/TPS

PLCC voice channel

is not working since

long time due to faulty

PLCC exchange at

Birsinghpur.

AE Birsinghpur informed that

presently voice communication

between SLDC to thermal power

house is proper & the commissioning

of EPAX at site is under progress. AE

Birsinghpur assured that the voice

channel of Birsinghpur HPS shall be

restored within one month.

In last meeting it was

informed that the

restoration completed

by a month. However

restoration of voice

channel of Birsinghpur

HPS is still pending.

The matter regarding Non Availability/ Unreliable voice communication Between SLDC to Thermal/

Hydel Power Stations was discussed in various OCC meeting however 2 wire voice facility extension of

Singhaji 1 & 2 TPS, Madikheda HPS, is still pending.

9.7 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA:-

SLDC informed that out of 175 RTUs, SOE verification of 171 RTUs has been completed & SOE verification of

4 Sub – station i.e 400 KV Astha ,220 KV Gudgoan and 132 KV Khirkiya and Harda is still pending. MPPTCL

informed that SOE verification work of balance S/s will be completed at the earliest.

9.8 RECTIFICATION OF OPGW LINK BETWEEN 220 KV S/S SATNA –KATNI AND

400 KV BHOPAL -220 KV BHOPAL:- SLDC informed that Presently one link between 220 KV S/s

Satna –Katni is in working condition as Out of 8 fibre 3 fibre is in healthy condition hence only one link is

working and restoration of alternate/secondary link is still pending.

Minutes of 76th OCCM of MP 28

Further in 400 KV -220 KV Bhopal OPGW Link out of 24 Fiber 18 Fiber are found faulty. The

restoration of this fiber is requested. Hence both the link between 400 KV Bhopal -220 KV Bhopal are not in

working condition. As no representative from EHT was present, the matter could not be discussed.

9.9 TELEMETRY OF RAILWAY TSS SUB STATIONS :- The telemetry of existing 38 Nos

Railway Traction Sub Stations & upcoming 25 new Railways TSS is required to be provided by railway for

monitoring of drawl by each TSS and also monitoring of demand of railway in MP. Hence telemetry of 25 Nos

Railway Traction Sub Stations out of 63 has been commissioned and are reporting to SLDC, Jabalpur .

However telemetry availability of Railway TSS are very poor. Please provide the status of remaining 38 Nos

Railway Traction Sub Stations as well as ensure reliable telemetry of existing Railway TSS. As No

representatives from Railways were present in the meeting, the matter could not be discussed.

ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING:- It is proposed to hold 77th

Operation and Coordination Committee meeting of MP in 1st week of MARCH.

***********

Minutes of 76th OCCM of MP 29

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.09 HzBetween 10.00 hrs & 11.00 Hrs on 13.09.20

50.11 HzBetween 09.00 hrs & 10.00 Hrs on 02.10.20

50.08 HzBetween 18.00 hrs & 19.00 Hrs on 14.11.20

1.2 Minimum Frequency 49.79 HzBetween 18.00 hrs & 19.00 Hrs on 19.09.20

49.81 HzBetween 07.00 hrs & 08.00 Hrs on 13.07.20

49.84 HzBetween 17.00 hrs & 18.00 Hrs on 05.11.20

1.3 Average Frequency 50 Hz 50 Hz 49.84 Hz

2

2.1 Maximum Frequency 50.2 HzAT 06.02.40 HRS ON 26.09.20

50.27 HzAT 10.05:20 HRS ON 12.10.20

50.27 HzAT 00.04:30 HRS ON 16.11.20

2.2 Minimum Frequency 49.64 HzAT 18:50:40 HRS ON 24.09.20

49.7 HzAT 18:14:20. HRS ON 28.10.20

49.68 HzAT 17:20:00. HRS ON 05.11.20

3 Percentage of time when frequency was :-

%age of time when frequency was Sep-20 Oct-20 Nov-20

3.1 Below 48.5 Hz 0.00 0 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0 0

3.6 Between 49.70 Hz and 49.9 Hz 4.23 3.91 4.53

3.7 Between 49.9 Hz and 50.05 Hz 84.23 81.87 79.82

3.8 Between 50.05 Hz AND 51.5 Hz 11.54 14.21 15.65

3.9 Above 51.5 Hz 0.00 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Sep-20 Oct-20 Nov-20

Minutes of 76th OCCM of MP 30

Annexure-3.2.2

Sr No

KV TIME DATE KV TIME DATE

1 414 2.00 1 Sep 20 401 10.00 9 Sep 20

2 416 4.00 24 Sep 20 400 10.40 5 Sep 20

3 418 2.00 1 Sep 20 405 11.00 2 Sep 20

4 426 2.00 1 Sep 20 410 10.00 9 Sep 20

5 423 3.00 3 Sep 20 405 2.00 29 Sep 20

6 415 4.00 24 Sep 20 397 10.20 9 Sep 20

7 418 4.00 20 Sep 20 404 11.00 2 Sep 20

8 423 2.00 1 Sep 20 407 10.00 9 Sep 20

9 424 20.00 20 Sep 20 406 9.00 2 Sep 20

10 435 18.00 20 Sep 20 419 19.00 24 Sep 20

11 423 2.00 21 Sep 20 409 10.00 9 Sep 20

12 3.30 4 Jun 20 15.30 25 Jun 20

13 18.00 10 Jun 20 7.00 22 Jun 20

14 18.00 14 Jun 20 13.53 1 Jun 20

15 18.03 19 Jun 20 13.53 1 Jun 20

16 18.00 11 Jun 20 11.00 9 Jun 20

17 18.00 14 Jun 20 23.00 2 Jun 20

18 18.00 14 Jun 20 21.00 8 Jun 20

Sep-20M A X I M U M M I N I M U M

Indore

Bhopal

Nagda

Isp

Katni

Sagar

Satpura

SGTPS Birsinghpur

Bina

Pithampur

Ashta

Julwania

Kirnapur

Badnawar

Name of Sub Station

Singaji

chhegaon

Itarsi

Gwalior

Minutes of 76th OCCM of MP 31

Sr No

KV TIME DATE KV TIME DATE

1 417 21.00 24 Oct 20 398 15.00 13 Oct 20

2 419 20.15 31 Oct 20 396 10.25 10 Oct 20

3 420 20.00 30 Oct 20 399 16.00 17 Oct 20

4 425 4.00 2 Oct 20 407 16.00 27 Oct 20

5 420 6.00 7 Oct 20 405 11.00 10 Oct 20

6 418 20.00 31 Oct 20 392 10.25 10 Oct 20

7 421 20.00 25 Oct 20 402 11.00 10 Oct 20

8 423 21.00 24 Oct 20 399 16.00 27 Oct 20

9 425 20.00 2 Oct 20 402 11.00 10 Oct 20

10 435 22.00 31 Oct 20 419 11.00 10 Oct 20

11 424 21.00 24 Oct 20 405 15.00 17 Oct 20

12 0.30 30 Aug 20 9.30 28 Aug 20

13 18.00 3 Aug 20 9.00 24 Aug 20

14 5.00 29 Aug 20 11.32 5 Aug 20

15 6.02 26 Aug 20 11.32 5 Aug 20

16 4.00 14 Aug 20 12.00 17 Aug 20

17 5.00 29 Aug 20 23.00 1 Aug 2018 18.00 3 Aug 20 21.00 17 Aug 20

Isp

KatniSagar

Kirnapur

Badnawar

Singaji

chhegaon

Itarsi

Gwalior

M I N I M U M

Indore

Bhopal

Nagda

Satpura

Name of Sub Station

SGTPS Birsinghpur

Bina

Pithampur

Oct-20

M A X I M U M

Ashta

Julwania

Minutes of 76th OCCM of MP 32

Sr NoKV TIME DATE KV TIME DATE

1 419 7.00 15 Nov 20 397 10.00 23 Nov 20

2 423 2.00 26 Nov 20 396 9.15 2 Nov 20

3 424 20.00 19 Nov 20 399 9.00 25 Nov 20

4 426 21.00 15 Nov 20 404 9.00 17 Nov 20

5 424 2.00 26 Nov 20 400 11.00 23 Nov 20

6 419 2.00 26 Nov 20 392 8.40 6 Nov 20

7 422 21.00 28 Nov 20 401 10.00 23 Nov 20

8 427 21.00 15 Nov 20 398 9.00 30 Nov 20

9 425 20.00 1 Nov 20 403 9.00 23 Nov 20

10 436 22.00 11 Nov 20 415 10.00 28 Nov 20

11 426 20.00 2 Nov 20 403 9.00 25 Nov 20

12 3.30 9 Jul 20 14.30 1 Jul 20

13 4.00 2 Jul 20 15.00 1 Jul 20

14 3.28 2 Jul 20 13.11 4 Jul 20

15 2.18 5 Jul 20 13.11 4 Jul 20

16 3.00 6 Jul 20 10.00 27 Jul 20

17 18.00 7 Jul 20 15.00 27 Jul 20

18 5.00 12 Jul 20 11.00 27 Jul 20

M I N I M U M Nov-20

Name of Sub Station M A X I M U M

Indore

Bhopal

Nagda

Satpura

SGTPS Birsinghpur

Bina

Julwania

Kirnapur

Badnawar

Sagar

Singaji

chhegaon

Itarsi

Gwalior

Isp

Katni

Pithampur

Ashta

Minutes of 76th OCCM of MP 33

Annexure‐.2.2.4

Sl.No.  Circle Capacitor Banks planned for 2020‐21 Remark

1 Jabalpur

1x12 MVAr at  132KV S/S Shahpura Patan, Vinoba Bhave, Gadarwara, Karapgaon, Mandla &  

Chichli 220, 2x12MVAr at 220KV S/S Narsinghpur & Shrinagar , Aug of 5MVAr bank with 

12MVAR at Narsinghpur 132

 ‐

2 Seoni  2x12MVAr at 132KV S/S Waraseoni   ‐

3 Satna1x12 MVAr bank at 132KV S/S  Deosar, 1x12MVAr at 220KV S/S Anooppur, Birsinghpur & 

132KV S/S Dongarital & Satna ‐

4 Sagar 1x12 MVAr bank at 132KV S/S  Hatta & 220KV S/s Tikamgarh  ‐

5 Bina 

2x12MVAR at  220KV S/S Ashoknagar & 132KV S/S Raghogarh  Bhonra, Existing 5MVAr to be 

upgraded by 12MVAr at 220KV S/S  Guna, 132KV S/S Aron , Addl 1x12MVAr bank at 132KV 

S/S  Ishagarh 

 ‐

6 Bhopal 1x12 MVAr bank at 132KV S/S  Bilquisganj,  IT Park  Badwai & Pilukhedi  ‐

7 Gwalior

 Mehgaon 220 *(2x5MVAr by 2x12MVAr), Bhind 132*(2x5MVAr by 2x12MVAr)  , Seondha 

132*(2x5MVAr by 2x12MVAr),  Dabra 132* (2x6MVAr by 2x12MVAr), Ambah 132*(2x5MVAr 

by 12MVAr), 1x12MVAr at Kolaras 132 , Karera 132 , Baroda 132 , Pichhor132 & Shivpuri 220 

*Augmentation of old bank

8 Khandwa

1x12MVAR  banks at  Badgaon, Bhikangaon, Pandhana, sanawad, kasrawad,Balwada, Andad, 

Talaqpura,Dhamnod, Sendhwa 132, Julwania & Nimrani 220  and  2x12MVAr at Bahadarpur & 

, 2x33MVAr at 400KV S/S Chhegaon & 1x33MVAr at 220KV S/S Nepanagar. Aug work of C 

Bank at C.Khargon & Pansemal 132

 ‐

9 Ujjain 

2x12MVAR at 220KV S/S Ujjain, Dewas & Badnagar , 1x12MVAr at 132KV S/S Bherugarh, 

Zarda, Tarana,Ujjain, Khategaon, Arniyakalan, Polaikalan & Panwadi & 6MVAR at Badnagar 

220

 ‐

10 Indore1x12MVAr at 132KV S/S  Rajgarh Dhar( 5to12), Petlawad , Meghnagar,  Depalpur132, Rau 

132, Simrol 132,  Rajgarh 220 & Alirajpur 132(12 to 24) ‐

11 Nagda2x5 to 1x12MVAR at Ratlam 220, 2x5 to 2x12MVAR at Ratlam 132, 1x5 to 1x12MVAr at Suwasra 132 & 

Mandsour 132, 1x12MVAr at 132KV S/S Tal,Manasa , Neemuch  & Bhanpura220, 2x12MVAr at 

Nagda220 & Khachrod 132

 ‐

Plan for installation of Capacitor Banks in 2020‐21

Minutes of 76th OCCM of MP 34

Annexure-2.3(i)

Sep-20 Oct-20 Nov-20 Sep-20 Oct-20 Nov-20

Commissinary HQ 23:53 23:50 23:56 23:50 23:50 23:47

District HQ 23:49 23:49 23:54 23:53 23:52 23:52

Tehsil HQ 23:39 23:42 23:46 23:43 23:45 23:46

Rural -Mixed 23:18 23:20 23:30 23:37 23:35 23:38

Rural -DLF 23:17 23:19 23:30 23:31 23:35 23:38

Rural -Irrigation 9:44 9:47 9:48 9:55 9:54 9:55

Sep-20 Oct-20 Nov-20 Sep-20 Oct-20 Nov-20

Commissinary HQ 23:54 23:55 23:56 23:52 23:51 23:53

District HQ 23:50 23:52 23:55 23:50 23:51 23:54

Tehsil HQ 23:47 23:49 23:53 23:43 23:45 23:48

Rural -3Phase 23:34 23:25 23:35 23:26 23:26 23:33

Rural -1Phase 23:40 23:41 23:47 23:28 23:31 23:37

Total Rural 9:46 9:50 9:53 9:48 9:50 9:52

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Minutes of 76th OCCM of MP 35

Annexure-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

JABALPUR REGION

Name of EHV Substation

Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission

-ing of feeder

220KV

220 KV Seoni 33 KV Karirat 21.08.2007 06.01.2016

132KV

132 KV Ponder 33 KV NSPL 19.01.2018 19.01.2018

132 KV Palohabada

33 KV Bilthari 33 KV Sadumar

01.04.2019 02.04.2019

01.04.2019 02.04.2019

132 KV Narsinghpur

33 KV Nagar Palika 28.02.2018

02.11.2018

132 KV Karapgaon

33 KV Karapgaon 33 KV Bansadehi 33 KV Kareli 33 KV Aamgaon

29.12.2017 29.12.2017 29.12.2017 29.12.2017

24.02.2018 27.01.2018 27.01.2018 28.01.2018

132 KV Nainpur 33 KV Keolari-II 22.01.2018 28.03.2018

132 KV Saori

33 KV Saori 33 KV Lawaghogri 33 KV Mujawar 33 KV Bhutai

05.10.2018 05.10.2018 06.11.2018 06.11.2018

12.11.2018 13.11.2018 12.11.2018 30.01.2019

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE

(For which group to be allocated) INDORE REGION

UJJAIN REGION

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of commissioning

of feeder

220KV 220KV Pithampur (Sec-III)

33KV SRF 03.09.2013 03.09.2013

132KV

132KV Chandrawatiganj

33KV Chandrawatiganj

27.04.2015

27.04.2015

132KV Electronic

33KV AKVN (Namkeen Cluster)

31.03.2016

31.03.2016

132KV Raukhedi

33KV DLF-I 33KV DLF-II

03.01.2014 03.01.2014

15.09.2018 15.09.2018

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of Charging of feeder

220KV 220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018

132KV

132KV Agar

33KV Agar Town-II

03.12.2012

24.05.2018

132KV Arniyakalan

33KV Designco Manufacture & Exporter (5MW Solar Power Plant)

01.05.2018

01.05.2018

132KV Agrod

33KV Madhopur 30.06.2018 26.07.2018

Minutes of 76th OCCM of MP 36

LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)

BHOPAL REGION

Name of EHV Substation

Name of 33KV feeder

Date of charging of feeder bay

Date of charging of feeder

220 KV 220 KV Pipariya 33 KV Food Park (AKVN)

19.06.2017 25.06.2017

132 KV

132 KV Tamot 33 KV Obedullaganj 33 KV AKVN-1 33 KV AKVN-2

05.05.2016 05.10.2016 05.10.2016

02.02.2017 05.10.2016 05.10.2016

132 KV Lateri 33 KV Anantpura

15.06.2017 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda

04.12.2017 04.12.2014

04.12.2017 04.12.2017

132 KV Udaipura 33 KV Thaladigawan 33 KV Boras 33 KV Udaipura

26.04.2018 04.06.2018 04.06.2018

04.06.2018 06.06.2018 07.01.2019

132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018

132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018

132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018

Minutes of 76th OCCM of MP 37

ANNEXURE-3.2

Date Time Date Time

1 400 315MVA X-mer-IV at 400KV S/S Nagda 22-Feb-21 08:00 23-Feb-21 17:00 Continue For maintenance and testing work.

2 400 315MVA -I Xmer at 400KV S/S Sagar 02-Feb-21 09:00 02-Feb-21 18:00 Daily For maintenance and testing work.3 400 315MVA -I Xmer at 400KV S/S Sagar 03-Feb-21 09:00 03-Feb-21 18:00 Daily For maintenance and testing work.

4 400 315MVA -II Xmer at 400KV S/S Sagar 05-Feb-21 09:00 05-Feb-21 18:00 Daily For maintenance and testing work.

5 400 315MVA -II Xmer at 400KV S/S Sagar 06-Feb-21 09:00 06-Feb-21 18:00 Daily For maintenance and testing work.

6 400 315MVA Transformer No.-01 at 400KV S/S Bhopal

16-Feb-21 09:00 16-Feb-21 22:00 Daily For maintenance and testing work.

7 400 315MVA Transformer No.-01 at 400KV S/S Bhopal

17-Feb-21 09:00 17-Feb-21 22:00 Daily For maintenance and testing work.

8 400 315MVA Transformer No.-03 at 400KV S/S Bhopal

22-Feb-21 09:00 22-Feb-21 22:00 Daily For maintenance and testing work.

9 400 315MVA Transformer No.-03 at 400KV S/S Bhopal

23-Feb-21 09:00 23-Feb-21 22:00 Daily For maintenance and testing work.

10 400 315MVA Transformer No.-04 at 400KV S/S Bhopal

25-Feb-21 09:00 25-Feb-21 22:00 Daily For maintenance and testing work.

11 400 315MVA Transformer No.-04 at 400KV S/S Bhopal

26-Feb-21 09:00 26-Feb-21 22:00 Daily For maintenance and testing work.

12 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha

04-Jan-21 08:00 05-Jan-21 18:00 Continue For maintenance and testing work.

13 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha

13-Jan-21 08:00 14-Jan-21 18:00 Continue For maintenance and testing work.

14 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha

02-Feb-21 08:00 03-Feb-21 18:00 Continue For maintenance and testing work.

15 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha

08-Feb-21 08:00 09-Feb-21 18:00 Continue For maintenance and testing work.

16 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha

02-Mar-21 08:00 03-Mar-21 18:00 Continue For maintenance and testing work.

17 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha

09-Mar-21 08:00 10-Mar-21 18:00 Continue For maintenance and testing work.

18 400 100MVA BHEL-I Xmer at 400KV Kirnapur 12-Mar-21 09:00 13-Mar-21 17:00 Continue For pre monsoon maintenance work

19 400 100MVA BHEL-II Xmer at 400KV Kirnapur

17-Mar-21 09:00 18-Mar-21 17:00 Continue For pre monsoon maintenance work

20 400 315MVA X-mer-I at 400kV S/s Chhegaon 15-Feb-21 10:00 16-Feb-21 18:00 Continue For pre monsoon maintenance work

5. PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD 01.01.21 TO 31.03.21

Sr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

A- 400 KV TRANSFORMERS

Minutes of 76th OCCM of MP 38

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

21 400 315MVA X-mer-II at 400kV S/s Chhegaon

18-Feb-21 10:00 19-Feb-21 18:00 Continue For pre monsoon maintenance work

22 400 315MVA X-mer -I at 400kV S/s Julwaniya 23-Feb-21 09:00 23-Feb-21 17:00 Daily For pre monsoon maintenance work

23 400 315MVA X-mer -I at 400kV S/s Julwaniya 24-Feb-21 09:00 24-Feb-21 17:00 Daily For pre monsoon maintenance work

24 400 315MVA X-mer -II at 400kV S/s Julwaniya

26-Feb-21 09:00 26-Feb-21 17:00 Daily For pre monsoon maintenance work

25 400 315MVA X-mer -II at 400kV S/s Julwaniya

27-Feb-21 09:00 27-Feb-21 17:00 Daily For pre monsoon maintenance work

26 400 315MVA ICT-I at 400KV S/s Indore 15-Feb-21 09:00 15-Feb-21 18:00 Daily For pre monsoon maintenance work27 400 315MVA ICT-I at 400KV S/s Indore 16-Feb-21 09:00 16-Feb-21 18:00 Daily For pre monsoon maintenance work28 400 315MVA ICT- II at 400KV S/s Indore 17-Feb-21 09:00 17-Feb-21 18:00 Daily For pre monsoon maintenance work29 400 315MVA ICT- II at 400KV S/s Indore 18-Feb-21 09:00 18-Feb-21 18:00 Daily For pre monsoon maintenance work30 400 315MVA ICT- III at 400KV S/s Indore 19-Feb-21 09:00 19-Feb-21 18:00 Daily For pre monsoon maintenance work31 400 315MVA ICT- III at 400KV S/s Indore 20-Feb-21 09:00 20-Feb-21 18:00 Daily For pre monsoon maintenance work32 400 315MVA ICT- IV at 400KV S/s Indore 22-Feb-21 09:00 22-Feb-21 18:00 Daily For pre monsoon maintenance work33 400 315MVA ICT- IV at 400KV S/s Indore 23-Feb-21 09:00 23-Feb-21 18:00 Daily For pre monsoon maintenance work

34 400 315MVA ICT-I at 400KV S/s Pithampur 15-Mar-21 08:00 16-Mar-21 17:00 Continue For pre monsoon maintenance work

35 400 315MVA ICT-II at 400KV S/s Pithampur 18-Mar-21 08:00 19-Mar-21 17:00 Continue For pre monsoon maintenance work

1 400 125Mvar Reactor at 400KV S/S Sagar 25-Mar-21 09:00 25-Mar-21 18:00 Daily For maintenance and testing work.

2 400 50MVAr Bus-reactor (At 400kV S/s Julwaniya)

08-Mar-21 09:00 08-Mar-21 17:00 Daily For pre monsoon maintenance work

3 400 400KV ISP-II 50MVAR Reactor at 400KV S/s Indore

24-Feb-21 09:00 24-Feb-21 18:00 Daily For pre monsoon maintenance work

4 400 400KV ISP-II 50MVAR Reactor at 400KV S/s Indore

25-Feb-21 09:00 25-Feb-21 18:00 Daily For pre monsoon maintenance work

5 400 2X50 MVAR Bus Reactor at 400KV S/s Pithampur

19-Mar-21 08:00 19-Mar-21 17:00 Daily For pre monsoon maintenance work

6 400 125MVAR Line Reactor (SSTPH-IV) at 400KV S/s Pithampur

20-Mar-21 08:00 20-Mar-21 17:00 Daily For pre monsoon maintenance work

7 400 125MVAR Line Reactor (SSTPH-III) at 400KV S/s Pithampur

22-Mar-21 08:00 22-Mar-21 17:00 Daily For pre monsoon maintenance work

8 400 400KV Pithampur-PGCIL-I 02-Mar-21 08:00 02-Mar-21 17:00 Daily For maintenance and testing work.9 400 400KV Pithampur-PGCIL-II 03-Mar-21 08:00 03-Mar-21 17:00 Daily For maintenance and testing work.10 400 400KV Pithampur-SSTPH-II 04-Mar-21 08:00 04-Mar-21 17:00 Daily For maintenance and testing work.11 400 400KV Pithampur-SSTPH-III 05-Mar-21 08:00 05-Mar-21 17:00 Daily For maintenance and testing work.12 400 400KV Pithampur-SSTPH-IV 06-Mar-21 08:00 06-Mar-21 17:00 Daily For maintenance and testing work.

B- 400 KV REACTORS

Minutes of 76th OCCM of MP 39

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

13 400 400KV Pithampur-Badnawar-I 07-Mar-21 08:00 07-Mar-21 17:00 Daily For maintenance and testing work.14 400 400KV Pithampur-Badnawar-II 09-Mar-21 08:00 09-Mar-21 17:00 Daily For maintenance and testing work.

Minutes of 76th OCCM of MP 40

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

1 400 400KV Nagda- Indore feeder at Nagda end

05-Jan-20 08:00 05-Jan-20 18:00 Daily For maintenance and testing work.

2 400 400KV Nagda- ISP feeder at Nagda end 24-Feb-21 08:00 24-Feb-21 18:00 Daily For maintenance and testing work.

3 400 400KV Nagda-Badnawar feeder-I at Nagda end

25-Feb-21 08:00 25-Feb-21 18:00 Daily For maintenance and testing work.

4 400 400KV MPPTCL Sagar-400KV PGCIL Satna

09-Feb-21 09:00 09-Feb-21 18:00 Daily For maintenance and testing work.

5 400 400KV MPPTCL Sagar-400KV PGCIL Bina 08-Feb-21 09:00 08-Feb-21 18:00 Daily For maintenance and testing work.

6 400 400KV Bus coupler at 400KV S/S Sagar 12-Feb-21 09:00 12-Feb-21 18:00 Daily For maintenance and testing work.

7 400 400Kv Bhopal- Bina-1 Bay 18-Jan-21 09:00 18-Jan-21 22:00 Daily For maintenance and testing work.8 400 400Kv Bhopal -Bina-2 Bay 19-Jan-21 09:00 19-Jan-21 22:00 Daily For maintenance and testing work.9 400 400Kv Bhopal -Itarsi-2 Bay 09-Mar-21 09:00 09-Mar-21 22:00 Daily For maintenance and testing work.10 400 400Kv Bhopal -Itarsi-1 Bay 16-Mar-21 09:00 16-Mar-21 22:00 Daily For maintenance and testing work.11 400 400Kv Bhopal -BDTCL-01 Bay 19-Mar-21 09:00 19-Mar-21 22:00 Daily For maintenance and testing work.12 400 400Kv Bhopal -Bdtcl-2 Bay 24-Mar-21 09:00 24-Mar-21 22:00 Daily For maintenance and testing work.13 400 400KV Kirnapur -Seoni PGCIL 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.14 400 400KV Kirnapur -Bhilai 22-Jan-21 09:00 22-Jan-21 17:00 Daily For maintenance and testing work.15 400 400KV Kirnapur -Seoni PGCIL 03-Mar-21 09:00 03-Mar-21 17:00 Daily For pre monsoon maintenance work16 400 400KV Kirnapur -Bhilai 05-Mar-21 09:00 05-Mar-21 17:00 Daily For pre monsoon maintenance work

17 400 400KV Chhegaon-Malwa at 400kV S/s Chhegaon

22-Feb-21 10:00 22-Feb-21 18:00 Daily For pre monsoon maintenance work

18 400 400KV Chhegaon-Julwaniya at 400kV S/s Chhegaon

24-Feb-21 10:00 24-Feb-21 18:00 Daily For pre monsoon maintenance work

19 400 400KV Julwania-SSTPS ta 400kV S/s Julwaniya

10-Mar-21 09:00 10-Mar-21 17:00 Daily For pre monsoon maintenance work

20 400 400KV Julwania-Chhegoan at 400kV S/s Julwaniya

12-Mar-21 09:00 12-Mar-21 17:00 Daily For pre monsoon maintenance work

21 400 400KV TBC Bay at 400kV S/s Julwaniya 15-Mar-21 09:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work

1 400 440KV Badnawar-Pithampur-I at 400KV S/S Badnawar

07-Feb-21 10:00 07-Feb-21 17:00 Daily For pre monsoon maintenance work

2 400 440KV Badnawar-Pithampur-II at 400KV S/S Badnawar

03-Mar-21 10:10 03-Mar-21 17:00 Daily For pre monsoon maintenance work

1 400 400KV Indore-ISP-I 26-Feb-21 09:00 26-Feb-21 18:00 Daily For pre monsoon maintenance work2 400 400KV Indore-ISP-II 27-Feb-21 09:00 27-Feb-21 18:00 Daily For pre monsoon maintenance work

3 400 400KV Bus Transfer at 400KV S/s Indore 04-Jan-21 09:00 04-Jan-21 18:00 Daily For pre monsoon maintenance work

4 400 400KV Indore-Nagda 02-Mar-21 09:00 02-Mar-21 18:00 Daily For pre monsoon maintenance work

C- 400 KV FEEDER & BAYS

Minutes of 76th OCCM of MP 41

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

5 400 400KV TBC at 400KV S/s Indore 03-Mar-21 09:00 03-Mar-21 18:00 Daily For pre monsoon maintenance work

6 400 400KV Bus Coupler at 400KV S/s Indore 04-Mar-21 09:00 04-Mar-21 18:00 Daily For pre monsoon maintenance work

1 220 160MVA X-mer-I At 220KV s/s Mehgaon 04-Jan-21 09:00 04-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

2 220 160MVA X-mer-II At 220KV s/s Mehgaon 04-Jan-21 09:00 04-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

3 220 160MVA X-mer-I At 220KV s/s Mehgaon 05-Jan-21 09:00 05-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

4 220 160MVA X-mer-II At 220KV s/s Mehgaon 05-Jan-21 09:00 05-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

5 220 160MVA X-Mer-I at 220KV S/S Datia 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.6 220 160MVA X-Mer-II at 220KV S/S Datia 19-Jan-21 09:00 19-Jan-21 17:00 Daily For maintenance and testing work.

7 220 160MVA X-mer-I At 220KV s/s Mehgaon 08-Feb-21 09:00 08-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

8 220 160MVA X-mer-II At 220KV s/s Mehgaon 08-Feb-21 09:00 08-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

9 220 160MVA X-mer-I At 220KV s/s Mehgaon 09-Feb-21 09:00 09-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

10 220 160MVA X-mer-II At 220KV s/s Mehgaon 09-Feb-21 09:00 09-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

11 220 160MVA X-Mer-I at 220KV S/S Datia 22-Feb-21 09:00 22-Feb-21 17:00 Daily For maintenance and testing work.12 220 160MVA X-Mer-II at 220KV S/S Datia 23-Feb-21 09:00 23-Feb-21 17:00 Daily For maintenance and testing work.

13 220 160MVA X-mer-I At 220KV s/s Mehgaon 04-Mar-21 09:00 04-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

14 220 160MVA X-mer-II At 220KV s/s Mehgaon 04-Mar-21 09:00 04-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

15 220 160MVA X-mer-I At 220KV s/s Mehgaon 05-Mar-21 09:00 05-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

D- 220 KV TRANSFORMERS

Minutes of 76th OCCM of MP 42

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

16 220 160MVA X-mer-II At 220KV s/s Mehgaon 05-Mar-21 09:00 05-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

17 220 160MVA X-Mer-I at 220KV S/S Datia 22-Mar-21 09:00 22-Mar-21 17:00 Daily For maintenance and testing work.18 220 160MVA X-Mer-II at 220KV S/S Datia 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.19 220 160MVA-I EMCO at 220KV Shivpuri 13-Mar-21 10:00 13-Mar-21 17:00 Daily For maintenance and testing work.20 220 160MVA-II BHEL at 220KV Shivpuri 16-Mar-21 10:00 16-Mar-21 17:00 Daily For maintenance and testing work.21 220 160VA BBL-I Xmer at 220KV Sheopur 06-Mar-21 10:00 06-Mar-21 17:00 Daily For maintenance and testing work.

22 220 160MVA BBL-II Xmer at 220KV Sheopur 09-Mar-21 10:00 09-Mar-21 17:00 Daily For maintenance and testing work.

23 220 160MVA BHEL Xmer at 220KV S/S Damoh

15-Mar-21 09:00 15-Mar-21 18:00 Daily For maintenance and testing work.

24 220 160MVA AREVA Xmer at 220KV S/s Damoh

16-Mar-21 09:00 16-Mar-21 18:00 Daily For maintenance and testing work.

25 220 160MVA AREVA Xmer at 400KV S/s Sagar

18-Mar-21 09:00 18-Mar-21 18:00 Daily For maintenance and testing work.

26 220 160MVA AREVA Xmer at 400KV S/s Sagar

19-Mar-21 09:00 19-Mar-21 18:00 Daily For maintenance and testing work.

27 220 160MVA AREVA Xmer at 220KV S/s Chhindwara

15-Mar-21 10:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work

28 220 160MVA BHEL Xmer at 220KV S/s Chhindwara

18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work

29 220 160MVA CGL Xmer at 220KV S/s Pandhurna

24-Mar-21 09:00 24-Mar-21 17:00 Daily For pre monsoon maintenance work

30 220 160MVA BBL Xmer at 220KV S/s Pandhurna

27-Mar-21 10:00 27-Mar-21 17:00 Daily For pre monsoon maintenance work

31 220 160MVA BBL Xmer at 220KV S/s Seoni 15-Mar-21 09:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work32 220 160MVA CGL Xmer at 220KV S/s Seoni 18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work

33 220 160MVA X-mer-I at 400KV S/s Julwania 14-Mar-21 09:00 14-Mar-21 17:00 Daily For pre monsoon maintenance work

34 220 160MVA X-mer-II at 400KV S/s Julwania 18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work

35 220 160MVA AREVA X-mer at 220kV S/s Julwaniya

28-Mar-21 09:00 28-Mar-21 17:00 Daily For pre monsoon maintenance work

1 220 220KV Malanpur-PGCIL-I CKT 04-Jan-21 09:00 04-Jan-21 17:00 Daily For maintenance and testing work.2 220 220KV Malanpur-PGCIL-II CKT 05-Jan-21 09:00 05-Jan-21 17:00 Daily For maintenance and testing work.3 220 220KV Malanpur-Adani CKT 06-Jan-21 09:00 06-Jan-21 17:00 Daily For maintenance and testing work.4 220 220KV Malanpur-Auraiya CKT 07-Jan-21 09:00 07-Jan-21 17:00 Daily For maintenance and testing work.5 220 220KV Malanpur-Morena-I CKT 11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance and testing work.6 220 220KV Malanpur-Morena-II CKT 12-Jan-21 09:00 12-Jan-21 17:00 Daily For maintenance and testing work.7 220 220KV Mahalgaon PGCIL-I Ckt 08-Jan-21 10:00 08-Jan-21 17:00 Daily For maintenance and testing work.

E- 220 KV FEEDER & BAYS-

Minutes of 76th OCCM of MP 43

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

8 220 220KV Mahalgaon PGCIL-II Ckt 09-Jan-21 10:00 09-Jan-21 17:00 Daily For maintenance and testing work.9 220 220KV Mahalgaon-Bina Ckt 15-Jan-21 10:00 15-Jan-21 17:00 Daily For maintenance and testing work.10 220 220KV Mahalgaon-Datia Ckt 16-Jan-21 10:00 16-Jan-21 17:00 Daily For maintenance and testing work.11 220 220KV Malanpur-PGCIL-I CKT 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.12 220 220KV Malanpur-PGCIL-II CKT 18-Feb-21 09:00 18-Feb-21 17:00 Daily For maintenance and testing work.13 220 220KV Malanpur-Adani CKT 06-Feb-21 09:00 06-Feb-21 17:00 Daily For maintenance and testing work.14 220 220KV Malanpur-Auraiya CKT 05-Feb-21 09:00 05-Feb-21 17:00 Daily For maintenance and testing work.15 220 220KV Malanpur-Morena-I CKT 07-Feb-21 09:00 07-Feb-21 17:00 Daily For maintenance and testing work.16 220 220KV Malanpur-Morena-II CKT 08-Feb-21 09:00 08-Feb-21 17:00 Daily For maintenance and testing work.17 220 220KV Mahalgaon PGCIL-I Ckt 09-Feb-21 10:00 09-Feb-21 17:00 Daily For maintenance and testing work.18 220 220KV Mahalgaon PGCIL-II Ckt 11-Feb-21 10:00 11-Feb-21 17:00 Daily For maintenance and testing work.19 220 220KV Mahalgaon-Bina Ckt 15-Feb-21 10:00 15-Feb-21 17:00 Daily For maintenance and testing work.20 220 220KV Mahalgaon-Datia Ckt 17-Feb-21 10:00 17-Feb-21 17:00 Daily For maintenance and testing work.21 220 220KV Gwalior II-PGCIL-I CKT 16-Mar-21 09:00 16-Mar-21 17:00 Daily For maintenance and testing work.22 220 220KV Gwalior II-PGCIL-II CKT 17-Mar-21 09:00 17-Mar-21 17:00 Daily For maintenance and testing work.23 220 220KV Malanpur-PGCIL-I CKT 22-Mar-21 09:00 22-Mar-21 17:00 Daily For maintenance and testing work.24 220 220KV Malanpur-PGCIL-II CKT 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.25 220 220KV Malanpur-Adani CKT 25-Mar-21 09:00 25-Mar-21 17:00 Daily For maintenance and testing work.26 220 220KV Malanpur-Auraiya CKT 26-Mar-21 09:00 26-Mar-21 17:00 Daily For maintenance and testing work.27 220 220KV Malanpur-Morena-I CKT 30-Mar-21 09:00 30-Mar-21 17:00 Daily For maintenance and testing work.28 220 220KV Malanpur-Morena-II CKT 31-Mar-21 09:00 31-Mar-21 17:00 Daily For maintenance and testing work.29 220 220KV Mahalgaon PGCIL-I Ckt 03-Mar-21 10:00 03-Mar-21 17:00 Daily For maintenance and testing work.30 220 220KV Mahalgaon PGCIL-II Ckt 05-Mar-21 10:00 05-Mar-21 17:00 Daily For maintenance and testing work.31 220 220KV Mahalgaon-Bina Ckt 18-Mar-21 10:00 18-Mar-21 17:00 Daily For maintenance and testing work.32 220 220KV Mahalgaon-Datia Ckt 19-Mar-21 10:00 19-Mar-21 17:00 Daily For maintenance and testing work.

33 220 220KV Mehgaon -Adani 04-Jan-21 09:00 04-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

34 220 220KV Mehgaon-Auraiya 04-Jan-21 09:00 04-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

35 220 220KV Mehgaon -Adani 05-Jan-21 09:00 05-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

36 220 220KV Mehgaon-Auraiya 05-Jan-21 09:00 05-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

37 220 220KV Datia- Bina 13-Jan-21 09:00 13-Jan-21 17:00 Daily For maintenance and testing work.38 220 220KV Datia- Gwalior 14-Jan-21 09:00 14-Jan-21 17:00 Daily For maintenance and testing work.

39 220 220KV Mehgaon -Adani 08-Feb-21 09:00 08-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

Minutes of 76th OCCM of MP 44

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

40 220 220KV Mehgaon-Auraiya 08-Feb-21 09:00 08-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

41 220 220KV Mehgaon -Adani 09-Feb-21 09:00 09-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

42 220 220KV Mehgaon-Auraiya 09-Feb-21 09:00 09-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

43 220 220KV Datia- Bina 15-Feb-21 09:00 15-Feb-21 17:00 Daily For maintenance and testing work.44 220 220KV Datia- Gwalior 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.

45 220 220KV Mehgaon -Adani 04-Mar-21 09:00 04-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

46 220 220KV Mehgaon-Auraiya 04-Mar-21 09:00 04-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

47 220 220KV Mehgaon -Adani 05-Mar-21 09:00 05-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

48 220 220KV Mehgaon-Auraiya 05-Mar-21 09:00 05-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon

49 220 220KV Datia- Bina 15-Mar-21 09:00 15-Mar-21 17:00 Daily For maintenance and testing work.50 220 220KV Datia- Gwalior 16-Mar-21 09:00 16-Mar-21 17:00 Daily For maintenance and testing work.51 220 220KV Bus Tie at 220KV Shivpuri 11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance and testing work.52 220 220KV Shivpuri Main Bus-II 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.53 220 220KV Shivpuri - Bina PGCIL 12-Feb-21 09:00 12-Feb-21 17:00 Daily For maintenance and testing work.54 220 220KV Shivpuri - Bina MPPTCL 15-Feb-21 09:00 15-Feb-21 17:00 Daily For maintenance and testing work.55 220 220KV Sheopur - Sabalgarh I 10-Mar-21 09:00 10-Mar-21 17:00 Daily For maintenance and testing work.56 220 220KV Sheopur - Sabalgarh II 12-Mar-21 09:00 12-Mar-21 17:00 Daily For maintenance and testing work.57 220 220KV Sagar-Bina I 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.58 220 220KV Sagar-Bina II 06-Jan-21 09:00 06-Jan-21 18:00 Daily For maintenance and testing work.59 220 220KV Sagar- PGCIL Damoh -I 08-Jan-21 09:00 08-Jan-21 18:00 Daily For maintenance and testing work.60 220 220KV Sagar- PGCIL Damoh -II 12-Jan-21 09:00 12-Jan-21 18:00 Daily For maintenance and testing work.61 220 220KV Sagar- PGCIL Damoh -I 16-Jan-21 09:00 16-Jan-21 18:00 Daily For maintenance and testing work.62 220 220KV Sagar- PGCIL Damoh -II 18-Jan-21 09:00 18-Jan-21 18:00 Daily For maintenance and testing work.63 220 220KV Damoh-PGCIL-I 20-Jan-21 09:00 20-Jan-21 18:00 Daily For maintenance and testing work.64 220 220KV Damoh-PGCIL-II 23-Jan-21 09:00 23-Jan-21 18:00 Daily For maintenance and testing work.65 220 220KV Sagar- PGCIL Damoh -I 11-Feb-21 09:00 11-Feb-21 18:00 Daily For maintenance and testing work.66 220 220KV Sagar- PGCIL Damoh -II 15-Feb-21 09:00 15-Feb-21 18:00 Daily For maintenance and testing work.67 220 220KV Sagar- PGCIL Damoh -II 19-Feb-21 09:00 19-Feb-21 18:00 Daily For maintenance and testing work.

Minutes of 76th OCCM of MP 45

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

68 220 220KV Vidisha-Bhopal Line 15-Mar-21 10:00 15-Mar-21 17:00 Daily For maintenance and testing work.69 220 220KV Vidisha-Bina Line 17-Mar-21 10:00 17-Mar-21 17:00 Daily For maintenance and testing work.70 220 220KV Ganjbasoda-Bhopal Line 19-Mar-21 10:00 19-Mar-21 17:00 Daily For maintenance and testing work.71 220 220KV Ganjbasoda-Bina Line 22-Mar-21 10:00 22-Mar-21 17:00 Daily For maintenance and testing work.72 220 220KV Pandhurna-Kamleshwar 19-Jan-21 10:00 19-Jan-21 17:00 Daily For maintenance and testing work.73 220 220KV Pandhurna-Betul PGCIL 12-Jan-21 09:00 12-Jan-21 17:00 Daily For maintenance and testing work.74 220 220KV Pandhurna-Kamleshwar 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.75 220 220KV Pandhurna-Betul PGCIL 09-Feb-21 10:00 09-Feb-21 17:00 Daily For maintenance and testing work.76 220 220KV Pandhurna-Kamleshwar 10-Mar-21 10:00 10-Mar-21 17:00 Daily For maintenance and testing work.77 220 220KV Pandhurna-Betul PGCIL 17-Mar-21 09:00 17-Mar-21 17:00 Daily For maintenance and testing work.78 220 220KV Chhindwara-PGCIL-I 08-Mar-21 10:00 08-Mar-21 17:00 Daily For maintenance and testing work.79 220 220KV Chhindwara-PGCIL-II 09-Mar-21 10:00 09-Mar-21 17:00 Daily For maintenance and testing work.80 220 220KV Seoni-PGCIL-I 13-Jan-21 09:00 13-Jan-21 17:00 Daily For maintenance and testing work.81 220 220KV Seoni-PGCIL-II 15-Jan-21 09:00 15-Jan-21 17:00 Daily For maintenance and testing work.82 220 220KV Seoni-PGCIL-I 09-Feb-21 09:00 09-Feb-21 17:00 Daily For maintenance and testing work.83 220 220KV Seoni-PGCIL-II 12-Feb-21 09:00 12-Feb-21 17:00 Daily For maintenance and testing work.84 220 220KV Seoni-PGCIL-I 08-Mar-21 09:00 08-Mar-21 17:00 Daily For maintenance and testing work.85 220 220KV Seoni-PGCIL-II 10-Mar-21 09:00 10-Mar-21 17:00 Daily For maintenance and testing work.

86 220220KV Chhegaon-Khandwa (PGCIL)-I at 400kV S/s Chhegaon 08-Mar-21 10:00 08-Mar-21 18:00 Daily For maintenance and testing work.

87 220220KV Chhegaon-Khandwa (PGCIL)-II at 400kV S/s Chhegaon 10-Mar-21 10:00 10-Mar-21 18:00 Daily For maintenance and testing work.

88 220220KV Nepanagar-Khandwa (PGCIL) at 400kV S/s Nepanagar 12-Mar-21 10:00 12-Mar-21 18:00 Daily For maintenance and testing work.

89 220220KV Barwaha-Nimrani Tap Omkareshwar at 220KV S/s Barwaha 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.

90 220220KV Nimrani-Barwaha Tap Omkareshwar at 220KV S/s Nimrani 06-Jan-21 09:00 06-Jan-21 17:00 Daily For maintenance and testing work.

91 220220KV Barwaha-Indore-I at 220KV S/s Barwaha 05-Feb-21 09:00 05-Feb-21 18:00 Daily For maintenance and testing work.

92 220220KV Nimrani-Maheshwar-I at 220KV S/s Nimrani 06-Feb-21 09:00 06-Feb-21 17:00 Daily For maintenance and testing work.

93 220220KV Barwaha-Handiya at 220KV S/s Barwaha 05-Mar-21 09:00 05-Mar-21 18:00 Daily For maintenance and testing work.

94 220220KV Nimrani-Julwaniya at 220KV S/s Nimrani 06-Mar-21 09:00 06-Mar-21 17:00 Daily For maintenance and testing work.

95 220220KV Julwania-Omkareshwar at 220kV S/s Julwaniya 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.

96 220 220KV Indore East at 400KV S/s Indore 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.

97 220 220KV South Zone- I at 400KV S/s Indore

06-Jan-21 09:00 06-Jan-21 18:00 Daily For maintenance and testing work.

Minutes of 76th OCCM of MP 46

Date Time Date TimeSr- No

KV Line / Transformer / Reactor / BayFrom To Basis

(Daily/Continue)

Reason

98 220 220KV Pithampur at 400KV S/s Indore 07-Jan-21 09:00 07-Jan-21 18:00 Daily For 220KV R-Phase LA replacement99 220 220KV Barwaha I at 400KV S/s Indore 08-Jan-21 09:00 08-Jan-21 18:00 Daily For maintenance and testing work.100 220 220KV TBC at 400KV S/s Indore 11-Jan-21 09:00 11-Jan-21 18:00 Daily For maintenance and testing work.101 220 220KV Pithampur at 400KV S/s Indore 05-Mar-21 09:00 05-Mar-21 18:00 Daily For maintenance and testing work.102 220 220KV Badnagar at 400KV S/s Indore 06-Mar-21 09:00 06-Mar-21 18:00 Daily For maintenance and testing work.

103 220 220KV South Zone -I at 400KV S/s Indore

08-Mar-21 09:00 08-Mar-21 18:00 Daily For maintenance and testing work.

104 220 220KV South Zone -II at 400KV S/s Indore

09-Mar-21 09:00 09-Mar-21 18:00 Daily For maintenance and testing work.

105 220 220KV Jetpura at 400KV S/s Indore 10-Mar-21 09:00 10-Mar-21 18:00 Daily For maintenance and testing work.106 220 220KV Mangliya at 400KV S/s Indore 11-Mar-21 09:00 11-Mar-21 18:00 Daily For maintenance and testing work.107 220 220KV Dewas at 400KV S/s Indore 15-Mar-21 09:00 15-Mar-21 18:00 Daily For maintenance and testing work.

108 220 220KV Barwaha -I at 400KV S/s Indore 16-Mar-21 09:00 16-Mar-21 18:00 Daily For maintenance and testing work.

109 220 220KV Barwaha -II at 400KV S/s Indore 17-Mar-21 09:00 17-Mar-21 18:00 Daily For maintenance and testing work.

110 220 220KV Indore- East at 400KV S/s Indore 22-Mar-21 10:00 26-Mar-21 18:00 Continue Breaker Over hauling (Load on TBC )

111 220 220KV Interconnecter-I at 400KV S/s Pithampur

19-Mar-21 08:00 19-Mar-21 17:00 Daily For maintenance and testing work.

112 220 220KV Interconnecter-II at 400KV S/s Pithampur

20-Mar-21 08:00 20-Mar-21 17:00 Daily For maintenance and testing work.

113 220 220KV Pithampur Sector-I at 400KV S/s Pithampur

21-Mar-21 08:00 21-Mar-21 17:00 Daily For maintenance and testing work.

114 220 220KV Badnagar at 400KV S/s Pithampur 23-Mar-21 08:00 23-Mar-21 17:00 Daily For maintenance and testing work.

115 220 220KV Depalpur at 400KV S/s Pithampur 24-Mar-21 08:00 24-Mar-21 17:00 Daily For maintenance and testing work.

116 220 220KV Shujalpur-PGCIL-I at 220KV S/s Shujalpur

08-Jan-21 09:00 08-Jan-21 17:00 Daily For maintenance and testing work.

117 220 220KV Shujalpur-PGCIL-II at 220KV S/s Shujalpur

09-Jan-21 09:00 09-Jan-21 17:00 Daily For maintenance and testing work.

118 220 220KV Ujjain-PGCIL-I at 220KV S/S Ujjain

04-Jan-21 09:00 04-Jan-21 17:00 Daily For maintenance & Panel replacement work

119 220 220KV Ujjain-PGCIL-II at 220KV S/S Ujjain

11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance & Panel replacement work

Minutes of 76th OCCM of MP 47

Annexure-4.1

A. ThermalStn. Name UNIT No.

CapacityMW Sep-20 Oct-20 Nov-20

5 210 147.37 156.50 149.15

PH III 210 147.37 156.50 149.15

TOT 210 147.37 156.50 149.15

6 200 0.00 12.49 15.12

7 210 0.00 40.45 92.73

PH II 410 0.00 52.94 107.85

8 210 0.00 0.00 0.00

9 210 0.00 0.00 0.00

PH III 420 0.00 0.00 0.00

10 250 73.52 179.83 147.49

11 250 153.30 176.41 173.51

PH IV 500 226.81 356.25 321.00

TOT 1330 226.81 409.19 428.85

1 210 79.56 128.88 109.82

2 210 89.88 100.44 122.67

PH I 420 169.44 229.32 232.49

3 210 0.02 51.87 122.34

4 210 108.73 108.23 123.25

PH II 420 108.75 160.09 245.59

5 500 226.27 331.92 354.85

PH III 500 226.27 331.92 354.85

TOT 1340 504.45 721.34 832.93

1 600 204.96 296.91 359.07

2 600 66.06 164.64 266.46

PH1 1200 271.02 461.55 625.53

3 660 0.00 0.00 0.00

4 660 94.65 0.00 0.00

PH II 1320 94.65 0.00 0.00

TOT 1860 365.67 461.55 625.53

4740 1244.30 1748.58 2036.46

B. HydelCapacity

MWSep-20 Oct-20 Nov-20

115.0 6.73 12.16 22.91172.0 0.00 0.00 0.00

99.0 14.13 23.42 42.75386.0 20.86 35.58 65.66193.0 10.43 17.79 32.83160.0 108.73 48.67 10.33107.0 72.49 32.45 6.89

90.0 54.13 40.87 18.20315.0 92.84 135.83 111.48

20.0 12.03 3.77 0.6260.0 25.81 30.08 0.0030.0 9.76 12.24 11.2845.0 28.48 7.87 15.9722.5 17.00 4.70 9.5320.0 12.09 12.60 14.1860.0 17.88 16.85 14.13

1186.0 382.61 344.35 261.85915.0 368.48 320.93 219.10917.5 324.45 307.16 219.14

CapacityMW

Sep-20 Oct-20 Nov-20

Indira Sagar Hydel Project 1000 706.20 211.68 120.21Omkareshwar Hydel Project 520 338.45 98.85 64.90

C. NHDC (Ex-Bus)Station Name

M.P.RAJGHATB.SGR(JINHA)MADIKHEDATOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

BARGITONSBIRSINGHPURB.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHAT

R.P.SAGARJ.SAGARCHAMBALM.P.CHAMBAL

PENCHM.P.PENCH

MPPGCL THERMAL

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

Station Name

GANDHISAGAR

Unitwise / Stationwise Genration in MU

AM

AR

KA

NT

AK

SA

TP

UR

AS

AN

JA

Y G

AN

DH

IS

ST

PS

Ann 4.1

Minutes of 76th OCCM of MP 48

S No. Source Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Total

30 31 30 31 31 30 31 30 0 0 0 0 244

A.

1 Thermal 1154.07 1517.47 935.53 1895.85 1212.59 1146.01 1638.86 1903.36 0.00 0.00 0.00 0.00 11403.73

2 Hydel 161.23 169.23 170.62 200.93 264.08 321.29 302.49 216.60 0.00 0.00 0.00 0.00 1806.48

3 Total 1315.30 1686.70 1106.15 2096.78 1476.67 1467.30 1941.36 2119.96 0.00 0.00 0.00 0.00 13210.21

B.1 Indira Sagar 181.07 162.15 292.16 67.96 214.73 703.15 210.21 119.07 0.00 0.00 0.00 0.00 1950.49

2 Omkareshwar 93.20 89.67 186.06 47.31 107.47 338.45 98.85 64.90 0.00 0.00 0.00 0.00 1025.90

3 MPPMCL Schedule from Central Sector of WR 1676.81 1838.12 1587.89 2294.03 2137.08 1952.62 2166.13 2355.25 0.00 0.00 0.00 0.00 16007.95

4 MPPMCL Schedule from Central Sector ER 29.03 31.12 17.37 40.16 15.78 22.41 29.06 19.26 0.00 0.00 0.00 0.00 204.18

5 Total MPPMCL Schedule from Central Sector (WR+ER) 1705.84 1869.24 1605.26 2334.20 2152.86 1975.03 2195.19 2374.51 0.00 0.00 0.00 0.00 16212.13

6 Deviation Energy of (WR+ER) -26.49 -44.04 -67.05 -38.75 -79.00 -26.75 -52.06 -50.77 0.00 0.00 0.00 0.00 -384.90

7 NET NR ISGS POWER SCH to MP 33.77 36.02 23.24 67.10 23.39 44.42 14.24 12.51 0.00 0.00 0.00 0.00 254.70

8 RUMS SOLAR REWA (Scheduled Energy) 139.14 145.59 102.04 105.61 97.41 85.47 86.71 79.56 0.00 0.00 0.00 0.00 841.54

9 Schedule From Sugen 0.00 0.00 0.00 0.28 0.00 1.16 0.09 0.00 0.00 0.00 0.00 0.00 1.54

10 LANCO Amk 160.37 190.54 161.97 200.92 182.70 191.83 202.42 158.74 0.00 0.00 0.00 0.00 1449.50

11 SASAN 962.99 988.26 973.27 980.47 974.32 945.16 1018.85 979.38 0.00 0.00 0.00 0.00 7822.70

12 ESSAR (STOA against LTA) 0.00 0.00 0.00 0.00 0.00 0.61 2.57 6.66 0.00 0.00 0.00 0.00 9.84

13 J P Nigri 154.17 277.07 292.51 326.75 325.70 304.48 301.59 323.58 0.00 0.00 0.00 0.00 2305.85

14 MB Power 124.33 138.82 58.09 241.18 135.53 156.67 267.23 240.72 0.00 0.00 0.00 0.00 1362.56

15 JHABUA Power 1.79 53.37 40.84 124.91 60.13 55.74 115.77 109.93 0.00 0.00 0.00 0.00 562.49

16 Other Open Access Schedule other than MPPMCL Incl. Seci 25.21 -44.39 -102.81 -7.50 25.12 -95.92 -171.34 -200.92 0.00 0.00 0.00 0.00 -572.55

17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19 Schedule from Sardar Sarovar 102.42 72.63 257.75 89.98 87.10 491.79 104.97 61.60 0.00 0.00 0.00 0.00 1268.26

20 SCH to Railway from RGPPL_ebid 96.87 107.46 119.40 125.83 120.80 133.31 149.32 171.20 0.00 0.00 0.00 0.00 1024.19

21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 Schedule from Rihand+Matatila 4.80 9.82 10.95 13.54 15.98 19.05 20.11 9.64 0.00 0.00 0.00 0.00 103.89

23 MTOA / STOA FROM RAJASTHAN 0.00 0.00 0.00 0.00 0.00 41.76 43.15 41.76 0.00 0.00 0.00 0.00 126.67

24 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 Additional Power Purchase 0.00 0.00 0.02 0.00 0.00 22.57 160.77 130.72 0.00 0.00 0.00 0.00 314.09

27 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

28 Banking of Energy -218.38 -374.78 -480.43 -765.09 -622.52 -838.24 121.31 915.12 0.00 0.00 0.00 0.00 -2263.01

29 Sale of Power -1.88 -11.53 -65.88 -19.06 -75.75 -85.61 -38.16 -27.55 0.00 0.00 0.00 0.00 -325.43

30 Total MP Schedule (Including Railway) 3291.44 3458.12 2996.23 3819.12 3502.76 3449.30 4594.79 5387.18 0.00 0.00 0.00 0.00 30498.94

31 Total MP Drawal (Including Railway) 3264.95 3414.08 2929.18 3780.38 3423.76 3422.54 4542.73 5336.41 0.00 0.00 0.00 0.00 30114.04

32 Wheeled Energy of Tawa HEG 3.71 1.25 0.00 0.00 3.38 11.03 5.10 10.38 0.00 0.00 0.00 0.00 34.85

33 Wheeled Energy of Wind Farm 13.67 21.16 13.60 9.19 18.88 6.78 7.28 7.18 0.00 0.00 0.00 0.00 97.75

34 Wheeled Energy of Solar Plant 86.82 91.71 70.89 73.37 51.64 75.20 83.54 80.29 0.00 0.00 0.00 0.00 613.46

35 Wheeled Energy of Bio-Mass + Baggase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 0.99 1.33 1.11 1.65 4.77 4.27 2.15 1.07 0.00 0.00 0.00 0.00 17.33

37 Export to MSEB (Nepa-Dharni) Wheeling -11.95 -9.07 -4.83 -5.69 -5.24 -5.33 -5.96 -10.85 0.00 0.00 0.00 0.00 -58.90

38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -19.99 -24.47 -3.48 -36.39 -14.73 -13.28 -29.74 -19.35 0.00 0.00 0.00 0.00 -161.41

39 Energy Purchased by MP from Wind Farm 333.95 584.35 437.00 322.77 503.22 210.19 207.99 203.56 0.00 0.00 0.00 0.00 2803.03

40 Energy Purchased by MP from Solar Plant 156.85 167.48 128.20 131.57 92.58 127.61 140.11 132.62 0.00 0.00 0.00 0.00 1077.03

41 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

0.00 39.66 116.67 15.73 13.66 91.34 174.71 193.89 0.00 0.00 0.00 0.00 645.66

42

Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

2.45 3.22 2.60 3.22 2.62 2.40 3.40 3.59 0.00 0.00 0.00 0.00 23.51

43 Deviation Energy of ISP 1.16 1.59 2.17 1.40 1.57 3.05 1.48 1.14 0.00 0.00 0.00 0.00 13.56

44 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 1.13 0.22 0.65 0.15 0.56 0.00 0.00 0.00 0.00 2.70

45 Schedule Energy of JP BINA Power against LTOA 0.00 0.00 0.00 0.00 0.00 4.87 20.87 48.43 0.00 0.00 0.00 0.00 74.17

46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.00 0.00 -0.01 1.93 3.30 3.49 4.08 4.79 0.00 0.00 0.00 0.00 17.59

47 Chambal Complex Excess / less Overshare by MP -1.75 -2.02 -1.62 -4.41 -11.30 -3.85 -5.88 -10.51 0.00 0.00 0.00 0.00 -41.34

48 Rajghat Hydel Power Station Excess / Less Overshare by MP 0.89 0.23 -0.05 -0.04 1.27 4.46 0.75 2.67 0.00 0.00 0.00 0.00 10.17

49 State Supply (Ex-Power stn. Bus) 5421.33 6229.01 5275.82 6507.87 5888.47 6454.33 7403.16 8289.80 0.00 0.00 0.00 0.00 51469.79

50 AVERAGE DAILY (Ex-Bus) 180.71 200.94 175.86 209.93 189.95 215.14 238.81 276.33 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 210.94

51 MINIMUM DAILY (MP Periphery) 159.83 169.76 139.30 178.76 154.91 186.18 211.29 252.39 0.00 0.00 0.00 0.00 139.30

52 MAXIMUM DAILY (MP Periphery) 185.15 216.01 195.88 226.79 220.56 225.38 257.70 281.33 0.00 0.00 0.00 0.00 281.33

53 State Supply (Ex-Power st. Bus):- YEAR : 2019-20 6144.12 6714.64 6193.49 5839.82 5497.58 5154.90 5348.44 6699.76 7477.06 7430.43 7614.52 6043.82 47592.76

54 Year ((20-21)-(19-20))*100/Year (19-20) -11.76 -7.23 -14.82 11.44 7.11 25.21 38.42 23.73 -100.00 -100.00 -100.00 -100.00 8.15

55 Unshedule L/S : Year-2020-21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56 Frequency Correction 1.40 2.06 1.48 2.93 2.40 2.53 2.57 3.05 0.00 0.00 0.00 0.00 18.43

57 Restricted Requirement : Year-2020-21 5422.73 6231.07 5277.31 6510.80 5890.87 6456.86 7405.73 8292.85 0.00 0.00 0.00 0.00 51488.22

58 Shedule L/S : Year-2020-21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

59 Un-Restricted Requirement : Year-2020-21 5422.73 6231.07 5277.31 6510.80 5890.87 6456.86 7405.73 8292.85 0.00 0.00 0.00 0.00 51488.22

ENERGY BALANCE SHEETYear : 2020 -21

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

29

Minutes of 76th OCCM of MP 49

S.NO. Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Yr 20-21

C.1 DEMAND MET 9000 10003 8940 10112 9774 10103 12546 14234 0 0 0 0 14234

2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0

3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0

D.1 DEMAND MET 7562 8833 8048 9514 9012 9670 10741 12424 0 0 0 0 12424

2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0

3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0

F. REGISTERED MAXIMUM 9000 10003 8940 10112 9774 10103 12546 14234 0 0 0 0 14234

G. COMPUTED MAXIMUM DEMAND 9008 10003 8940 10139 9774 10103 12546 14234 0 0 0 0 14234

H. UNRESTRICTED MAXIMUM DEMAND 9008 10003 8940 10139 9774 10103 12546 14234 0 0 0 0 14234

I.1. Div. Head Quarters 23:55 23:45 23:52 23:53 23:51 23:52 0:00 0:00 0:00 0:00 0:00 0:00 17:53

2. District Head Quarters 23:52 23:48 23:47 23:53 23:52 23:50 0:00 0:00 0:00 0:00 0:00 0:00 17:53

3. Tahsil Head Quarters 23:53 23:44 23:46 23:50 23:47 23:43 0:00 0:00 0:00 0:00 0:00 0:00 17:50

4. Rural -Mixed 23:47 23:35 23:38 23:41 23:33 23:26 0:00 0:00 0:00 0:00 0:00 0:00 17:42

5. Rural -DLF 23:48 23:34 23:34 23:40 23:34 23:28 0:00 0:00 0:00 0:00 0:00 0:00 17:42

6. Rural -Irrigation 9:55 9:50 9:49 9:54 9:50 9:48 0:00 0:00 0:00 0:00 0:00 0:00 7:23

J LOAD FACTOR % 83.66 83.70 81.96 86.50 80.98 88.73 79.31 80.89 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 83.22

S.N PARTICULARS Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Yr 20-21

A. INTGRATED FREQUENCY1 MAXIMUM 50.15 50.14 50.19 50.26 50.10 50.09 0.00 0.00 0.00 0.00 0.00 0.00 50.26

2 MINIMUM 49.87 49.86 49.86 49.81 49.77 49.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.30 50.29 50.31 50.39 50.23 50.20 0.00 0.00 0.00 0.00 0.00 0.00 50.39

2 MINIMUM 49.61 49.57 49.63 49.62 49.60 49.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. AVG FREQUENCY 50.01 50.01 50.01 50.00 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 37.50

D. % TIME WHEN FREQUENCY WAS1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 50.05 TO 51.5 Hz 19.78 19.10 18.58 15.13 13.00 11.54 0.00 0.00 0.00 0.00 0.00 0.00 12.14

3 49.9 TO 50.05 Hz 75.13 76.67 76.91 78.16 80.92 84.23 0.00 0.00 0.00 0.00 0.00 0.00 59.00

4 49.7 TO 49.9 Hz 5.09 4.23 4.51 6.71 6.08 4.23 0.00 0.00 0.00 0.00 0.00 0.00 3.86

5 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2020 -21

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2020-21

29

Minutes of 76th OCCM of MP 50

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSSNet

NR to MP

Sugen

Lanco SasanEssa

rJP

Nigri

RUMS (SOLA

R) REWA TO

MPPMCL

MB Power

Jhabua

Power

SSP

SCH to

Railway

SEZ Banking Sale PurSTO

A

Rihand+

Matatila-

Rajghat

MTOA / STOA FROM RAJASTHAN

Total SCHUN

SCHTOTAL

1:00 50.01 1903 1765 494 981 476 138 383 4237 2974 79 2 264 1266 3 417 0 337 124 661 179 0 -1903 -7 80 -73 17 56 4476 8713 4496 21 -8 8726 0 0 0 8727 8727

2:00 50.01 1889 1753 486 979 477 140 392 4227 2979 76 7 264 1266 2 400 0 321 124 641 180 0 -1903 -10 80 -75 17 56 4425 8652 4344 -82 -8 8562 0 0 0 8563 8563

3:00 50.01 1892 1756 484 981 477 139 398 4234 2964 79 7 264 1268 1 398 0 308 118 642 177 0 -1903 -5 71 -76 17 56 4385 8619 4380 -5 -8 8607 0 0 0 8609 8609

4:00 50.01 1902 1765 483 978 475 134 393 4228 2945 68 7 264 1260 0 392 0 316 118 642 180 0 -1903 -8 71 -76 17 56 4349 8577 4364 15 -8 8584 0 0 0 8585 8585

5:00 49.99 1864 1729 478 978 475 134 391 4187 2909 66 5 264 1267 0 392 0 290 112 642 180 0 -1775 -21 71 -76 17 56 4398 8584 4436 38 -8 8615 0 0 0 8620 8620

6:00 50.00 1823 1692 465 978 478 133 373 4119 2781 48 0 264 1266 0 395 2 263 90 631 181 0 -1111 -32 12 -79 17 56 4785 8904 4701 -83 -8 8812 0 0 0 8815 8815

7:00 50.02 1836 1703 470 979 478 133 412 4175 2814 57 0 260 1259 0 402 40 304 104 634 181 0 -960 -7 18 -88 17 56 5091 9266 5024 -67 -8 9191 0 0 0 9192 9192

8:00 50.03 1742 1615 463 976 479 132 549 4215 2700 25 0 260 1262 0 402 134 239 78 634 180 0 -960 -6 6 -131 17 56 4897 9113 4724 -174 -8 8931 0 0 0 8932 8932

9:00 50.02 1653 1533 457 980 477 136 811 4395 2602 24 0 260 1269 0 402 265 160 63 636 177 0 -960 -10 0 -188 17 56 4773 9168 4730 -44 -7 9117 0 0 0 9119 9119

10:00 50.02 1546 1434 454 970 473 137 1007 4475 2468 18 0 260 1277 0 404 370 117 21 637 178 0 -960 -2 0 -225 17 56 4635 9111 4517 -118 -7 8986 0 0 0 8987 8987

11:00 50.01 1446 1341 446 963 474 137 1086 4447 2351 18 0 244 1280 0 402 418 56 19 656 181 0 -960 -30 0 -247 17 56 4461 8908 4369 -92 -6 8810 0 0 0 8812 8812

12:00 50.00 1430 1326 446 964 470 137 1102 4445 2139 18 0 233 1260 0 402 428 29 10 673 175 0 -960 -132 0 -254 16 56 4095 8540 3998 -97 -6 8436 0 0 0 8441 8441

13:00 50.00 1457 1352 440 963 462 137 1056 4409 2219 18 0 237 1270 0 403 390 39 12 675 170 0 -960 -142 0 -252 16 56 4151 8560 4140 -11 -6 8544 0 0 0 8548 8548

14:00 49.99 1484 1377 442 963 460 132 968 4342 2249 19 0 237 1275 0 403 333 58 12 681 170 0 -960 -115 0 -232 16 56 4204 8546 4182 -22 -6 8517 0 0 0 8523 8523

15:00 50.00 1527 1417 451 960 459 132 885 4304 2341 19 0 244 1281 0 411 254 80 19 681 168 0 -960 -109 0 -203 16 56 4300 8604 4228 -71 -6 8527 0 0 0 8531 8531

16:00 49.98 1573 1459 448 962 457 132 718 4175 2491 20 0 256 1289 0 417 153 108 25 682 176 0 -960 -105 0 -166 16 56 4459 8634 4257 -202 -6 8426 0 0 0 8432 8432

17:00 49.97 1633 1514 450 958 455 132 530 4039 2526 18 0 260 1290 0 417 53 146 36 682 180 0 -960 -102 0 -129 16 56 4488 8526 4406 -82 -6 8438 0 0 0 8447 8447

18:00 49.96 1675 1553 453 958 464 127 348 3903 2517 18 0 264 1286 0 418 6 171 50 688 177 0 -960 -79 0 -90 16 56 4539 8442 4394 -145 -7 8291 0 0 0 8301 8301

19:00 49.96 1913 1774 462 970 473 140 308 4127 2859 37 0 264 1288 4 425 0 319 132 706 177 0 -960 -284 80 -91 16 56 5029 9156 4896 -133 -8 9015 0 0 0 9028 9028

20:00 50.03 1945 1806 466 975 476 139 330 4192 2844 25 2 264 1279 4 428 0 324 134 703 185 0 -960 -465 80 -84 16 56 4836 9028 4678 -158 -8 8861 0 0 0 8863 8863

21:00 50.00 1806 1676 464 977 472 137 366 4093 2778 22 0 264 1278 4 428 0 298 129 703 184 0 -960 -492 74 -84 16 56 4699 8791 4523 -175 -8 8608 0 0 0 8612 8612

22:00 50.03 1792 1662 488 971 480 142 365 4106 2715 21 0 264 1264 2 428 0 262 95 702 184 0 -960 -497 65 -84 16 56 4535 8641 4470 -65 -9 8567 0 0 0 8568 8568

23:00 50.02 1832 1699 495 974 487 138 360 4154 2758 22 2 264 1266 1 428 0 265 93 700 186 0 -960 -163 41 -82 16 56 4895 9049 4902 7 -8 9047 0 0 0 9048 9048

24:00 50.03 1864 1729 495 978 487 138 366 4194 2736 21 2 264 1266 1 428 0 237 80 689 183 0 -960 -113 41 -78 16 56 4870 9064 4699 -171 -8 8884 0 0 0 8885 8885

Avg. 50.00 1726 1601 466 972 472 136 579 4226 2653 35 2 258 1272 1 410 119 210 75 667 179 0 -1157 -122 33 -132 16 56 4574 8800 4494 -80 -7 8713 0 0 0 8716 8716

00 TO 06 HRS.

50.01 1879 1743 482 979 476 137 388 4205 2925 69 5 264 1266 1 399 0 306 114 643 179 0 -1750 -14 64 -76 17 56 4470 8675 4454 -16 -8 8651 0 0 0 8653 8653

06 TO 12 HRS.

50.01 1609 1492 456 972 475 135 828 4359 2512 27 0 253 1268 0 402 276 151 49 645 179 0 -960 -31 4 -189 17 56 4659 9017 4560 -99 -7 8912 0 0 0 8914 8914

12 TO 18 HRS.

49.99 1558 1445 447 960 459 132 751 4195 2391 18 0 250 1282 0 411 198 100 26 681 174 0 -960 -109 0 -179 16 56 4357 8552 4268 -89 -6 8457 0 0 0 8464 8464

06TO 18 HRS.

50.00 1584 1469 452 966 467 134 789 4277 2452 23 0 251 1275 0 407 237 126 37 663 176 0 -960 -70 2 -184 16 56 4508 8785 4414 -94 -7 8684 0 0 0 8689 8689

18 TO 24 HRS.

50.01 1859 1724 478 974 479 139 349 4144 2782 25 1 264 1274 3 427 0 284 110 700 183 0 -960 -336 64 -84 16 56 4811 8955 4694 -116 -8 8830 0 0 0 8834 8834

Devia -tion

Export to MS

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2020

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Minutes of 76th OCCM of MP 51

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen

Lanco

Sasan

Essar

JP Nigri

RUMS (SOLAR)

REWA TO

MPPMCL

MB Power

Jhabua

Power

SSP

SCH to

Railway

SEZ

Banking Sale PurSTO

A

Rihand+

Matatila-

Rajghat

MTOA / STOA FROM RAJASTHAN

Total SCHUN

SCHTOTAL

1:00 50.01 2308 2138 431 299 137 248 390 3644 2818 16 0 265 1333 0 395 0 356 169 153 198 0 141 0 217 -185 23 56 5957 9601 5899 -58 -8 9534 0 0 0 9536 9536

2:00 50.01 2310 2139 400 245 121 254 360 3519 2697 15 0 265 1328 0 385 0 356 136 153 202 0 141 -6 211 -190 23 56 5773 9292 5604 -170 -8 9115 0 0 0 9116 9116

3:00 50.01 2324 2152 398 224 108 254 341 3477 2736 15 0 265 1325 0 384 0 356 152 153 194 0 141 -8 211 -190 23 56 5814 9292 5825 11 -8 9294 0 0 0 9296 9296

4:00 50.02 2361 2188 398 248 117 254 332 3536 2800 14 0 265 1318 0 378 0 356 163 153 200 0 141 -9 211 -190 23 56 5880 9416 5853 -27 -8 9381 0 0 0 9382 9382

5:00 49.98 2365 2192 400 247 117 254 326 3536 2856 15 0 265 1321 1 378 0 356 169 153 199 0 141 -8 220 -190 23 56 5954 9490 5902 -52 -8 9430 0 0 0 9437 9437

6:00 50.00 2377 2202 410 262 127 254 322 3577 2938 15 0 265 1324 2 385 2 356 169 153 198 0 141 -5 226 -191 23 56 6056 9633 5962 -94 -8 9530 0 0 0 9535 9535

7:00 50.01 2412 2235 467 398 186 294 375 3955 3261 32 0 265 1325 9 387 16 367 175 150 199 0 141 0 249 -174 23 56 6481 10436 6526 45 -9 10472 0 0 0 10475 10475

8:00 50.04 2398 2222 475 432 211 305 615 4260 3122 30 0 265 1327 10 388 103 360 175 150 199 0 189 -5 249 -204 23 56 6439 10699 6204 -235 -9 10455 0 0 0 10455 10455

9:00 50.03 2382 2208 455 362 179 289 803 4295 3056 33 2 265 1327 5 389 263 360 175 149 188 0 189 -13 223 -267 23 56 6423 10718 6399 -24 -8 10686 0 0 0 10687 10687

10:00 50.03 2345 2172 428 321 160 268 1022 4371 2843 18 0 261 1332 3 388 387 360 158 148 189 0 189 -7 223 -326 23 56 6246 10616 6145 -101 -8 10508 0 0 0 10508 10508

11:00 50.00 2252 2086 387 268 135 251 1174 4301 2702 16 0 261 1333 2 388 452 348 135 132 192 0 189 -12 211 -375 23 56 6054 10355 6004 -50 -7 10297 0 0 0 10300 10300

12:00 50.01 2179 2017 388 258 122 251 1222 4258 2493 15 0 257 1333 0 389 456 292 84 126 177 0 189 -17 158 -383 23 56 5649 9907 5401 -248 -7 9652 0 0 0 9654 9654

13:00 49.99 2277 2109 372 222 114 251 1162 4231 2637 14 0 261 1333 1 389 417 327 118 124 180 0 189 -5 170 -377 23 56 5858 10088 5897 40 -7 10121 0 0 0 10127 10127

14:00 50.00 2349 2177 377 243 118 252 1038 4205 2738 15 0 261 1333 2 392 350 355 144 126 182 0 189 0 202 -355 23 56 6014 10218 6080 67 -7 10278 0 0 0 10283 10283

15:00 49.99 2417 2242 384 269 118 260 868 4141 2915 14 0 265 1333 3 399 233 360 165 126 182 0 189 -3 229 -299 23 56 6190 10331 6237 47 -7 10371 0 0 0 10378 10378

16:00 49.99 2455 2277 395 280 117 281 629 3978 3129 15 0 265 1333 5 402 103 360 175 125 192 0 189 0 229 -254 23 56 6345 10323 6319 -26 -7 10291 0 0 0 10297 10297

17:00 49.96 2463 2285 391 303 126 301 343 3749 3230 15 0 265 1333 8 408 14 360 175 124 185 0 189 -5 237 -196 23 56 6422 10170 6491 69 -7 10232 0 0 0 10245 10245

18:00 49.97 2464 2286 405 325 147 288 233 3684 3031 18 0 265 1333 8 412 3 360 175 129 197 0 189 -114 234 -158 23 56 6160 9844 5819 -341 -9 9495 0 0 0 9507 9507

19:00 50.02 2439 2262 393 285 137 275 285 3637 3103 24 0 265 1335 10 413 1 380 175 133 201 0 141 -487 255 -132 23 56 5897 9534 5680 -217 -9 9308 0 0 0 9309 9309

20:00 50.04 2258 2092 396 240 121 255 351 3454 2732 22 0 265 1338 5 403 0 342 105 142 197 0 141 -251 237 -177 23 56 5580 9035 5328 -252 -9 8773 0 0 0 8773 8773

21:00 50.01 2158 1997 406 211 108 252 392 3366 2522 19 0 265 1336 1 403 0 264 89 144 202 0 141 -197 155 -187 23 56 5237 8603 5126 -111 -9 8482 0 0 0 8484 8484

22:00 50.04 2187 2024 412 225 113 252 404 3430 2470 20 0 265 1333 1 402 0 280 73 144 206 0 141 -57 155 -189 23 56 5323 8753 5230 -94 -9 8651 0 0 0 8651 8651

23:00 50.03 2392 2217 443 301 140 251 397 3749 2920 21 0 265 1333 5 401 0 369 171 141 199 0 141 -7 243 -191 23 56 6091 9840 6139 48 -8 9880 0 0 0 9880 9880

24:00 50.02 2427 2251 454 339 142 249 395 3829 2862 18 0 265 1333 5 401 0 369 181 126 204 0 141 -1 243 -189 23 56 6037 9866 5936 -101 -8 9757 0 0 0 9759 9759

Avg. 50.01 2346 2174 411 284 134 264 574 3841 2859 19 0 264 1331 4 394 117 348 150 140 194 0 163 -51 216 -232 23 56 5995 9836 5917 -78 -8 9750 0 0 0 9753 9753

00 TO 06 HRS.

50.00 2341 2168 406 254 121 253 345 3548 2807 15 0 265 1325 1 384 0 356 159 153 199 0 141 -6 216 -189 23 56 5906 9454 5841 -65 -8 9381 0 0 0 9384 9384

06 TO 12 HRS.

50.02 2328 2157 433 340 165 276 869 4240 2913 24 0 262 1330 5 388 280 348 150 143 191 0 181 -9 219 -288 23 56 6215 10455 6113 -102 -8 10345 0 0 0 10347 10347

12 TO 18 HRS.

49.98 2404 2229 387 274 123 272 712 3998 2947 15 0 263 1333 4 400 187 353 158 126 186 0 189 -21 217 -273 23 56 6165 10163 6141 -24 -7 10131 0 0 0 10139 10139

06TO 18 HRS.

50.00 2366 2193 410 307 144 274 790 4119 2930 20 0 263 1331 5 394 233 351 154 134 188 0 185 -15 218 -281 23 56 6190 10309 6127 -63 -8 10238 0 0 0 10243 10243

18 TO 24 HRS.

50.03 2310 2140 417 267 127 256 371 3577 2768 21 0 265 1335 4 404 0 334 132 138 202 0 141 -167 215 -178 23 56 5694 9272 5573 -121 -9 9142 0 0 0 9143 9143

TotAvl.

Act.Drl

Devia -tion

Export to MS

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2020

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Minutes of 76th OCCM of MP 52

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSSNet

NR to MP

Sugen

Lanco SasanEssa

rJP

Nigri

RUMS (SOLA

R) REWA TO

MPPMCL

MB Power

Jhabua

Power

SSP

SCH to

Railway

SEZ Banking Sale PurSTO

A

Rihand+

Matatila-

Rajghat

MTOA / STOA FROM RAJASTHAN

Total SCHUN

SCHTOTAL

1:00 48.38 2623 2430 233 77 42 297 485 3564 2788 13 0 200 1276 7 411 0 312 120 84 224 0 610 0 147 -249 8 54 6006 9569 5797 -209 -13 9348 0 0 0 9358 9358

2:00 48.39 2445 2262 224 43 23 297 463 3313 2690 13 0 192 1272 7 410 0 233 82 85 224 0 610 0 147 -249 8 54 5780 9093 5535 -245 -12 8836 0 0 0 8838 8838

3:00 48.39 2490 2303 217 43 19 297 464 3344 2720 13 0 192 1272 7 410 0 254 91 84 225 0 610 0 146 -251 8 54 5836 9181 5801 -36 -12 9133 0 0 0 9136 9136

4:00 48.38 2530 2341 218 43 19 298 427 3347 2800 13 0 205 1272 7 410 0 281 121 84 223 0 610 0 163 -250 8 54 6002 9348 5927 -75 -12 9262 0 0 0 9267 9267

5:00 48.37 2630 2436 225 67 46 298 402 3474 2826 14 0 208 1274 7 410 0 310 132 84 223 0 610 0 171 -251 8 54 6081 9555 5999 -82 -12 9462 0 0 0 9469 9469

6:00 48.40 2780 2577 266 99 101 298 398 3738 3055 18 0 204 1277 7 413 1 338 161 83 224 0 610 0 176 -251 8 54 6379 10117 6364 -14 -13 10090 0 0 0 10092 10092

7:00 48.38 2860 2652 352 173 122 359 404 4063 3474 34 0 204 1280 8 418 11 342 172 83 222 0 1562 0 202 -190 8 54 7884 11947 8093 209 -15 12141 0 0 0 12148 12148

8:00 48.41 2880 2671 429 321 169 408 621 4619 3589 23 0 204 1280 12 421 64 342 173 83 222 0 1884 0 212 -172 8 54 8399 13018 8173 -227 -15 12776 0 0 0 12778 12778

9:00 48.38 2889 2680 409 283 153 380 826 4731 3575 20 0 204 1280 13 423 216 342 173 83 219 0 1884 -3 202 -234 8 54 8459 13190 8358 -101 -15 13074 0 0 0 13080 13080

10:00 48.40 2874 2665 371 246 132 333 959 4706 3394 15 0 204 1280 14 423 343 342 173 82 216 0 1884 -5 202 -297 8 54 8332 13038 8206 -126 -16 12896 0 0 0 12898 12898

11:00 48.40 2834 2628 351 292 146 299 1092 4807 3168 13 0 204 1280 9 423 417 342 168 82 218 0 1884 -4 190 -440 8 54 8016 12823 7807 -209 -15 12599 0 0 0 12602 12602

12:00 48.40 2785 2581 302 238 130 297 1123 4671 2754 12 0 212 1276 8 423 438 307 141 82 214 0 1884 -10 148 -460 8 54 7491 12162 7137 -353 -15 11793 0 0 0 11795 11795

13:00 48.38 2828 2622 250 154 92 300 1083 4502 3064 12 0 212 1268 7 423 417 342 157 76 214 0 1884 -3 173 -449 8 54 7858 12360 7873 15 -15 12360 0 0 0 12368 12368

14:00 48.39 2844 2638 268 170 94 303 976 4448 3149 12 0 212 1256 7 423 343 342 173 73 215 0 1884 -8 187 -416 8 54 7916 12365 7918 1 -15 12351 0 0 0 12355 12355

15:00 48.38 2882 2674 280 172 90 331 790 4338 3406 15 0 212 1254 7 429 224 342 179 74 214 0 1884 -3 196 -364 8 54 8131 12469 8127 -5 -16 12448 0 0 0 12456 12456

16:00 48.37 2883 2675 314 225 110 390 489 4204 3547 15 0 212 1254 11 430 75 348 179 80 217 0 1884 -15 198 -239 8 54 8259 12463 8288 30 -16 12477 0 0 0 12485 12485

17:00 48.37 2886 2678 352 353 159 422 188 4151 3566 19 0 212 1254 12 430 14 348 179 80 218 0 1884 -20 198 -144 8 54 8313 12464 8253 -60 -15 12388 0 0 0 12400 12400

18:00 48.38 2883 2675 336 290 143 418 162 4024 3523 23 0 212 1253 12 430 2 348 179 84 223 0 1698 -180 198 -114 8 54 7952 11976 7276 -676 -17 11283 0 0 0 11291 11291

19:00 48.42 2831 2626 313 202 96 342 251 3829 3283 22 0 212 1256 12 424 0 348 166 84 221 0 610 -299 191 -195 8 54 6396 10225 6166 -230 -16 9979 0 0 0 9979 9979

20:00 48.41 2644 2450 283 153 69 303 330 3588 2698 19 0 208 1262 9 422 0 293 131 83 223 0 610 -294 159 -244 8 54 5643 9231 5471 -172 -17 9042 0 0 0 9042 9042

21:00 48.39 2445 2263 264 59 38 297 386 3306 2465 15 0 198 1264 8 417 0 170 18 84 224 0 610 -118 118 -243 8 54 5293 8599 5100 -193 -17 8390 0 0 0 8392 8392

22:00 48.42 2417 2236 254 70 36 296 437 3329 2496 13 0 196 1264 7 413 0 169 15 84 223 0 610 -66 115 -245 8 54 5358 8687 5162 -196 -15 8476 0 0 0 8476 8476

23:00 48.40 2678 2482 253 90 50 297 470 3642 2958 14 0 204 1265 7 412 0 326 161 84 224 0 610 0 192 -250 8 54 6268 9911 6218 -51 -14 9846 0 0 0 9847 9847

24:00 48.42 2700 2502 247 107 59 296 489 3701 2868 13 0 204 1268 7 411 0 327 145 86 223 0 610 0 183 -249 8 54 6158 9859 5997 -160 -13 9685 0 0 0 9685 9685

Avg. 48.39 2731 2531 292 165 89 327 572 3977 3077 16 0 205 1268 9 419 107 310 141 82 221 0 1226 -43 176 -269 8 54 7009 10985 6877 -132 -15 10839 0 0 0 10843 10843

00 TO 06 HRS.

48.38 2583 2392 230 62 42 297 440 3463 2813 14 0 200 1274 7 410 0 288 118 84 224 0 610 0 158 -250 8 54 6014 9477 5904 -110 -12 9355 0 0 0 9360 9360

06 TO 12 HRS.

48.39 2854 2646 369 259 142 346 838 4599 3326 20 0 205 1279 11 422 248 336 167 83 219 0 1831 -4 193 -299 8 54 8097 12696 7962 -135 -15 12546 0 0 0 12550 12550

12 TO 18 HRS.

48.38 2868 2660 300 227 115 361 615 4278 3376 16 0 212 1256 10 427 179 345 174 78 217 0 1853 -38 191 -288 8 54 8072 12350 7956 -116 -16 12218 0 0 0 12226 12226

06TO 18 HRS.

48.39 2861 2653 335 243 128 353 726 4439 3351 18 0 209 1268 10 424 214 341 171 80 218 0 1842 -21 192 -293 8 54 8084 12523 7959 -125 -16 12382 0 0 0 12388 12388

18 TO 24 HRS.

48.41 2619 2426 269 113 58 305 394 3566 2795 16 0 204 1263 8 417 0 272 106 84 223 0 610 -130 160 -237 8 54 5853 9419 5686 -167 -15 9236 0 0 0 9237 9237

TotAvl.

Act.Drl

Devia -tion

Export to MS

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2020

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Minutes of 76th OCCM of MP 53

SCHDemand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

Total Sch

Total Drawal

1:00 50.01 2956 2963 6 0 0 2963 2963 3373 3378 5 0 0 3378 3378 2205 2210 5 0 0 2211 2211 179 175

2:00 50.01 2890 2860 -29 0 0 2861 2861 3369 3334 -35 0 0 3334 3334 2214 2192 -22 0 0 2193 2193 180 176

3:00 50.01 2939 2937 -3 0 0 2937 2937 3300 3296 -4 0 0 3297 3297 2203 2202 -2 0 0 2202 2202 177 173

4:00 50.01 2925 2929 4 0 0 2930 2930 3274 3277 3 0 0 3277 3277 2198 2202 4 0 0 2202 2202 180 176

5:00 49.99 2879 2891 13 0 0 2893 2893 3267 3279 13 0 0 3281 3281 2259 2268 9 0 0 2269 2269 180 176

6:00 50.00 2815 2786 -28 0 0 2787 2787 3398 3363 -34 0 0 3364 3364 2510 2485 -25 0 0 2486 2486 181 178

7:00 50.02 2878 2856 -22 0 0 2856 2856 3464 3437 -27 0 0 3437 3437 2743 2721 -22 0 0 2721 2721 181 178

8:00 50.03 2821 2764 -57 0 0 2764 2764 3252 3187 -65 0 0 3188 3188 2859 2803 -56 0 0 2803 2803 180 177

9:00 50.02 2766 2752 -14 0 0 2752 2752 3456 3438 -18 0 0 3438 3438 2769 2754 -15 0 0 2755 2755 177 173

10:00 50.02 2784 2746 -38 0 0 2747 2747 3453 3406 -47 0 0 3407 3407 2696 2659 -36 0 0 2660 2660 178 174

11:00 50.01 2770 2741 -29 0 0 2741 2741 3362 3326 -36 0 0 3327 3327 2595 2566 -29 0 0 2567 2567 181 177

12:00 50.00 2619 2587 -31 0 0 2589 2589 3264 3226 -38 0 0 3227 3227 2482 2453 -29 0 0 2454 2454 175 170

13:00 50.00 2678 2674 -4 0 0 2675 2675 3229 3222 -7 0 0 3224 3224 2483 2478 -5 0 0 2479 2479 170 170

14:00 49.99 2647 2639 -8 0 0 2641 2641 3218 3207 -11 0 0 3209 3209 2510 2501 -9 0 0 2503 2503 170 170

15:00 50.00 2659 2634 -25 0 0 2636 2636 3243 3215 -28 0 0 3217 3217 2533 2510 -24 0 0 2511 2511 168 167

16:00 49.98 2657 2592 -65 0 0 2594 2594 3256 3176 -80 0 0 3178 3178 2545 2483 -62 0 0 2485 2485 176 175

17:00 49.97 2567 2541 -27 0 0 2543 2543 3224 3191 -33 0 0 3194 3194 2555 2529 -26 0 0 2532 2532 180 178

18:00 49.96 2588 2540 -48 0 0 2543 2543 3106 3048 -58 0 0 3052 3052 2572 2525 -47 0 0 2528 2528 177 178

19:00 49.96 3057 3007 -50 0 0 3011 3011 3204 3153 -52 0 0 3157 3157 2718 2675 -43 0 0 2680 2680 177 180

20:00 50.03 3093 3035 -57 0 0 3036 3036 3177 3117 -60 0 0 3118 3118 2573 2525 -48 0 0 2525 2525 185 184

21:00 50.00 3064 3001 -64 0 0 3002 3002 3115 3049 -67 0 0 3050 3050 2428 2376 -52 0 0 2377 2377 184 182

22:00 50.03 3030 3004 -26 0 0 3004 3004 3063 3036 -27 0 0 3036 3036 2365 2345 -20 0 0 2345 2345 184 182

23:00 50.02 3073 3073 1 0 0 3074 3074 3465 3465 0 0 0 3465 3465 2325 2325 1 0 0 2325 2325 186 184

24:00 50.03 3087 3026 -61 0 0 3026 3026 3484 3414 -70 0 0 3414 3414 2309 2263 -45 0 0 2264 2264 183 181

Avg. 50.00 2843 2816 -28 0 0 2817 2817 3292 3260 -32 0 0 3261 3261 2485 2460 -25 0 0 2461 2461 179 176

00 TO 06 HRS.

50.01 2901 2894 -6 0 0 2895 2895 3330 3321 -9 0 0 3322 3322 2265 2260 -5 0 0 2260 2260 179 176

06 TO 12 HRS.

50.01 2773 2741 -32 0 0 2742 2742 3375 3337 -39 0 0 3337 3337 2691 2659 -31 0 0 2660 2660 179 175

12 TO 18 HRS.

49.99 2633 2603 -29 0 0 2605 2605 3213 3177 -36 0 0 3179 3179 2533 2504 -29 0 0 2506 2506 174 173

06TO 18 HRS.

50.00 2703 2672 -31 0 0 2674 2674 3294 3257 -37 0 0 3258 3258 2612 2582 -30 0 0 2583 2583 176 174

18 TO 24 HRS.

50.01 3067 3024 -43 0 0 3026 3026 3252 3206 -46 0 0 3207 3207 2453 2418 -35 0 0 2419 2419 183 182

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2020

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 76th OCCM of MP 54

SCHDemand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

Total Sch

Total Drawal

1:00 50.01 2895 2875 -19 0 0 2876 2876 3501 3478 -24 0 0 3478 3478 3006 2986 -20 0 0 2987 2987 198 195

2:00 50.01 2782 2730 -52 0 0 2730 2730 3405 3340 -65 0 0 3341 3341 2904 2845 -59 0 0 2845 2845 202 199

3:00 50.01 2790 2793 2 0 0 2793 2793 3329 3331 2 0 0 3332 3332 2978 2978 1 0 0 2979 2979 194 192

4:00 50.02 2799 2790 -10 0 0 2790 2790 3338 3327 -11 0 0 3327 3327 3078 3067 -11 0 0 3067 3067 200 198

5:00 49.98 2777 2760 -17 0 0 2762 2762 3385 3364 -21 0 0 3367 3367 3128 3109 -20 0 0 3111 3111 199 197

6:00 50.00 2704 2675 -28 0 0 2677 2677 3505 3468 -37 0 0 3470 3470 3226 3192 -35 0 0 3193 3193 198 195

7:00 50.01 2873 2883 10 0 0 2884 2884 3674 3688 13 0 0 3689 3689 3690 3705 14 0 0 3706 3706 199 196

8:00 50.04 2892 2825 -67 0 0 2825 2825 3510 3430 -81 0 0 3430 3430 4097 4003 -94 0 0 4003 4003 199 197

9:00 50.03 2808 2800 -8 0 0 2801 2801 3743 3732 -10 0 0 3732 3732 3979 3968 -11 0 0 3968 3968 188 186

10:00 50.03 2793 2765 -28 0 0 2765 2765 3719 3682 -38 0 0 3682 3682 3915 3876 -39 0 0 3876 3876 189 186

11:00 50.00 2774 2759 -15 0 0 2759 2759 3607 3588 -20 0 0 3589 3589 3782 3762 -20 0 0 3763 3763 192 189

12:00 50.01 2608 2542 -66 0 0 2542 2542 3463 3375 -88 0 0 3376 3376 3659 3561 -97 0 0 3562 3562 177 174

13:00 49.99 2643 2653 10 0 0 2655 2655 3402 3414 12 0 0 3416 3416 3863 3877 14 0 0 3879 3879 180 177

14:00 50.00 2601 2617 17 0 0 2618 2618 3406 3428 21 0 0 3429 3429 4030 4055 25 0 0 4057 4057 182 179

15:00 49.99 2635 2647 12 0 0 2649 2649 3430 3445 15 0 0 3447 3447 4084 4100 16 0 0 4103 4103 182 179

16:00 49.99 2634 2626 -9 0 0 2627 2627 3457 3446 -11 0 0 3448 3448 4040 4030 -11 0 0 4032 4032 192 190

17:00 49.96 2627 2644 17 0 0 2647 2647 3494 3518 23 0 0 3522 3522 3864 3888 24 0 0 3893 3893 185 182

18:00 49.97 2847 2745 -101 0 0 2748 2748 3414 3292 -122 0 0 3296 3296 3388 3265 -123 0 0 3269 3269 197 194

19:00 50.02 3101 3027 -74 0 0 3027 3027 3233 3156 -77 0 0 3156 3156 2999 2927 -72 0 0 2928 2928 201 198

20:00 50.04 3028 2940 -88 0 0 2940 2940 3070 2980 -90 0 0 2980 2980 2739 2659 -81 0 0 2659 2659 197 195

21:00 50.01 2922 2882 -40 0 0 2882 2882 2898 2858 -41 0 0 2858 2858 2580 2544 -37 0 0 2544 2544 202 199

22:00 50.04 2865 2831 -34 0 0 2831 2831 2861 2827 -34 0 0 2827 2827 2821 2789 -32 0 0 2789 2789 206 203

23:00 50.03 2949 2961 13 0 0 2961 2961 3529 3544 15 0 0 3544 3544 3163 3178 15 0 0 3178 3178 199 196

24:00 50.02 2947 2914 -32 0 0 2915 2915 3545 3506 -39 0 0 3507 3507 3171 3136 -35 0 0 3137 3137 204 201

Avg. 50.01 2804 2779 -25 0 0 2779 2779 3413 3384 -29 0 0 3385 3385 3424 3396 -29 0 0 3397 3397 194 191

00 TO 06 HRS.

50.00 2791 2771 -21 0 0 2771 2771 3411 3385 -26 0 0 3386 3386 3053 3029 -24 0 0 3031 3031 199 196

06 TO 12 HRS.

50.02 2791 2762 -29 0 0 2763 2763 3620 3582 -37 0 0 3583 3583 3854 3813 -41 0 0 3813 3813 191 188

12 TO 18 HRS.

49.98 2665 2655 -9 0 0 2657 2657 3434 3424 -10 0 0 3426 3426 3878 3869 -9 0 0 3872 3872 186 183

06TO 18 HRS.

50.00 2728 2709 -19 0 0 2710 2710 3527 3503 -24 0 0 3505 3505 3866 3841 -25 0 0 3843 3843 188 186

18 TO 24 HRS.

50.03 2969 2926 -43 0 0 2926 2926 3189 3145 -44 0 0 3145 3145 2912 2872 -40 0 0 2872 2872 202 199

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- October 2020

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 76th OCCM of MP 55

SCHDemand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH

Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

Total Sch

Total Drawal

1:00 49.99 2814 2747 -66 0 0 2749 2749 3316 3239 -77 0 0 3241 3241 3523 3441 -82 0 0 3443 3443 231 228

2:00 50.00 2581 2508 -73 0 0 2509 2509 3076 2986 -90 0 0 2987 2987 3507 3407 -100 0 0 3408 3408 232 229

3:00 50.00 2621 2608 -13 0 0 2609 2609 3196 3180 -16 0 0 3181 3181 3437 3420 -18 0 0 3421 3421 232 229

4:00 50.00 2611 2587 -24 0 0 2588 2588 3233 3204 -29 0 0 3205 3205 3585 3553 -32 0 0 3554 3554 231 228

5:00 49.98 2630 2603 -27 0 0 2605 2605 3267 3236 -31 0 0 3238 3238 3746 3711 -35 0 0 3714 3714 231 227

6:00 50.01 2650 2644 -6 0 0 2644 2644 3424 3415 -9 0 0 3416 3416 4148 4138 -10 0 0 4139 4139 232 228

7:00 49.99 3189 3242 53 0 0 3244 3244 4050 4118 68 0 0 4121 4121 4877 4959 82 0 0 4962 4962 230 226

8:00 50.02 3414 3350 -64 0 0 3351 3351 4214 4135 -79 0 0 4136 4136 5594 5490 -104 0 0 5491 5491 230 226

9:00 50.00 3461 3431 -30 0 0 3433 3433 4354 4317 -37 0 0 4319 4319 5588 5538 -50 0 0 5541 5541 226 223

10:00 50.01 3428 3390 -37 0 0 3391 3391 4319 4272 -47 0 0 4272 4272 5502 5444 -59 0 0 5444 5444 223 220

11:00 50.01 3501 3439 -62 0 0 3439 3439 4264 4190 -74 0 0 4191 4191 5261 5169 -92 0 0 5170 5170 225 222

12:00 50.01 3129 3033 -96 0 0 3033 3033 3972 3850 -121 0 0 3851 3851 5245 5085 -160 0 0 5086 5086 221 218

13:00 49.99 3191 3192 1 0 0 3194 3194 4157 4158 1 0 0 4161 4161 5204 5204 0 0 0 5208 5208 221 218

14:00 50.00 3115 3112 -3 0 0 3113 3113 4099 4095 -3 0 0 4097 4097 5341 5336 -5 0 0 5338 5338 223 219

15:00 49.99 3144 3139 -5 0 0 3141 3141 4059 4054 -6 0 0 4056 4056 5461 5453 -8 0 0 5456 5456 221 218

16:00 49.98 3149 3153 4 0 0 3155 3155 4102 4107 6 0 0 4110 4110 5404 5411 8 0 0 5415 5415 224 221

17:00 49.98 3254 3234 -19 0 0 3237 3237 4244 4218 -25 0 0 4222 4222 5157 5127 -30 0 0 5132 5132 225 222

18:00 49.99 3545 3337 -208 0 0 3339 3339 4063 3823 -239 0 0 3826 3826 4537 4272 -265 0 0 4275 4275 230 227

19:00 50.03 3503 3418 -85 0 0 3418 3418 3620 3532 -88 0 0 3532 3532 3215 3137 -78 0 0 3137 3137 228 225

20:00 50.03 3314 3245 -69 0 0 3245 3245 3227 3160 -67 0 0 3161 3161 2767 2710 -57 0 0 2710 2710 231 227

21:00 50.01 3152 3074 -78 0 0 3075 3075 2908 2836 -72 0 0 2837 2837 2594 2531 -63 0 0 2532 2532 231 228

22:00 50.04 2852 2783 -70 0 0 2783 2783 2787 2718 -69 0 0 2718 2718 3107 3031 -76 0 0 3031 3031 231 227

23:00 50.02 2913 2894 -19 0 0 2895 2895 3441 3420 -21 0 0 3421 3421 3655 3632 -23 0 0 3632 3632 232 228

24:00 50.03 2854 2800 -54 0 0 2800 2800 3417 3359 -58 0 0 3359 3359 3685 3622 -63 0 0 3622 3622 231 227

Avg. 50.00 3084 3040 -44 0 0 3041 3041 3700 3651 -49 0 0 3652 3652 4339 4284 -55 0 0 4286 4286 228 225

00 TO 06 HRS.

50.00 2651 2616 -35 0 0 2617 2617 3252 3210 -42 0 0 3211 3211 3658 3612 -46 0 0 3613 3613 231 228

06 TO 12 HRS.

50.01 3353 3314 -39 0 0 3315 3315 4195 4147 -48 0 0 4148 4148 5345 5281 -64 0 0 5282 5282 226 223

12 TO 18 HRS.

49.99 3233 3195 -38 0 0 3197 3197 4120 4076 -44 0 0 4079 4079 5184 5134 -50 0 0 5137 5137 224 221

06TO 18 HRS.

50.00 3293 3254 -39 0 0 3256 3256 4158 4112 -46 0 0 4113 4113 5264 5207 -57 0 0 5210 5210 225 222

18 TO 24 HRS.

50.02 3098 3036 -62 0 0 3036 3036 3234 3171 -63 0 0 3171 3171 3171 3110 -60 0 0 3111 3111 230 227

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- November 2020

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 76th OCCM of MP 56

ANNEXURE-5

System Disturbance / System Incidence

1. System Disturbance on 09.09.2020 at 220kv s/s Sukha: On dated 09.09.20 at 01.10hrs, MP system was normaland frequency of National Grid was 49.97 Hz. At 01.14hrs, B-ph PT of 220kv Main Bus- 2 burst at 220kv s/s Sukha, leading to the operation of Bus bar protection of Main bus 2, in whichfollowing elements tripped – 220KV Sukha- Jabalpur ckt-2, 220KV Sukha- Panagar ckt-2, 220KV Sukha- Narsinghpur ckt-2, 220KV Bus Tie 400/220 KV ICT -2 at Sukha(PG) There was no generation loss andno load loss. As per the report received, faulty element replaced by new one. Supply restoration started at 02.22Hrs andthereby remaining elements got normalized.

2. System Disturbance on 17.09.20at 220kv s/s Satna: On dated 17.09.20 at around 00.50hrs, MP system was normal and frequency of National Grid was 49.99 Hz . At 00.56hrs, B-ph CVT of 220kv Satna(PG)-Satna(MP)-2 burst at 220kv s/s Satna. In this event following elements tripped – 220kv Satna(PG)-Satna(MP) ckt-1, 220kv Satna(PG)-Satna(MP) ckt -2 220kv Satna(PG)-Satna(MP) ckt-3, 220kv Satna(PG)-Maiharckt 220kv Satna(MP)-Chattarpurckt, 220kv Satna(MP)- Kotarckt 132kv Satna-Maiharckt, 132kv Satna-Ucchehrackt There was no generation loss andload loss of around 529 MW .Interruption occurred at 220kv s/s Satna and nearby132kv s/s. 220kv Supply restored by charging220kv Satna(MP)- Kotarckt and 132kv Satna-Maiharcktand thereby remaining elements normalized. *********

Minutes of 76th OCCM of MP 57

Annexure‐6.9

MVA Date & Time

1 EAST DINDORI DINDORI 132 132KV 40 20+20 38.41 03/12/2020 18:55:00 96% 108 62 -2X Replacement 20-50MVA, Approved in REC-II in BOD , Estimate not sanctioned.

-

2 EAST SINGROULI DONGRITAL 132 132KV 20 1x20 18.34 06/12/2020 10:05:00 92% 9 0 -Replacement 20-50MVA, Approved in REC-II in BOD , Estimate not sanctioned.

-

3 CENTRAL SHIVPURI BAIRAD 132 132KV 40 1x40 39.50 15/11/2020 14:50:00 99% 81 3 - - -

4 WEST RATLAM BILPANK 132 132kV 40 1x40 35.91 13/11/2020 07:45:00 90% 7 0 - - -

5 CENTRAL RAJGARH B KHILCHIPUR 132 132KV 70 50+20 64.94 22/11/2020 10:45:00 93% 40 1 - - -

6 CENTRAL RAJGARH B KHUJNER 132 132KV 50 1x50 46.84 20/11/2020 13:10:00 94% 3 0 - - -

7 CENTRAL SHIVPURI MADA 132 132KV 50 1x50 46.18 10/11/2020 19:35:00 92% 23 1 - - -

8 CENTRAL RAJGARH B PACHORE 132 132KV 80 40+40 75.38 14/11/2020 13:10:00 94% 23 1 - - -

9 CENTRAL BHIND PRATAPPURA 132 132KV 40 1x40 38.06 11/11/2020 15:25:00 95% 14 0 - - -

10 EAST SIDHI SIDHI 132 132KV 60 40+20 59.31 16/11/2020 17:30:00 99% 51 21 - - -

11 EAST SEONI LAKHANADON 132 132KV 80 40+40 72.14 04/12/2020 16:20:00 90% 3 0 - - -

12 CENTRAL ASHOKNAGAR ASHOK NAGAR 220 132KV 120 40+40+40 109.49 06/12/2020 12:55:00 91% 11 0 - - -

13 CENTRAL GUNA GUNA 220 132KV 143 63+40+40 137.57 10/12/2020 12:15:00 96% 13 2 - - -

14 CENTRAL SHIVPURI 220KV SHIVPURI 220KV 320 290.08 290.08 17/12/2020 18:15:00 91% 10 0

15 EAST SAGAR RAHATGARH 132 132KV 40 1x40 36.82 05/12/2020 11:20:00 92% 5 0 - - -

16 CENTRAL GUNA KAPASI 132 132KV 50 1x50 46.00 30/10/2020 07:20:00 92% 1 0 - - -

Sub‐Stations, where more than 90% load recorded in Rabi Season 2020‐21 (Upto 17‐12‐20), but not approved

S.No. DISCOM District Name of Substation Tr.

Voltage Class

Installed CapacityMVA

November + December 20 Cumulative % Load  Hours  in Nov & Dec 

20 Proposal Submitted

(vide A), MVA

REC-II(vide B), MVA

As per 106th BOD, 28.10.20Simultaneous Maximum % of

S.Max.Load

80% to 90% 90% to 100%

Minutes of 76th OCCM of MP 58

Meter Accuracy Acc. Acc. Reading M.F. Modem No

Cat Class Class Class Unit for MWH12345678

Note -Meter master updated on 30.09.2020

Annexure-8.6

S.No.

ENERGY METER Meter Sr. No.

Make Type

DETAILS OF ABT ENERGY METERS INSTALLED AT ..….THERMAL POWER STATION

LocationC.T.Ratio

SIM No. Particulars

C.T. Details P.T.RatioMeter Equipment Details

P.T.RatioDate ofComi. Ratio Ratio

Minutes of 76th OCCM of MP 59

PAGE-1

TIME

MF (FRACTION) MF (DECIMAL)NET ENERGY IMPORT (+) / EXPORT (-) [KWH)

IMPORT EXPORT IMPORT EXPORT IMPORT EXPORT IMPORT EXPORT KWH KWH IMPORT EXPORT

1 GENMAIN

CHECKMAIN

CHECK

2 BY UATsMAIN

CHECK ``MAIN

CHECK

3 BY STsMAIN

CHECKMAIN

CHECK

4 INTERFACE FEEDERS SENT OUTMAIN

CHECKMAIN

CHECK

Annexure-8.6

MONTHLY ABT METER READING DETAILS OF ………..THERMAL POWER STATION FOR THE MONTH OF …. 2020

DETAILS

DE

VIA

TIO

N C

HE

CK

M

ET

ER

METER CATEGORY

ENERGY METER NO.

AUX. CONSUMPTION BY STATION XMERS

NET ENERGYLAST MONTH'S READING

GENERATION UNIT NO.5

I

II

PRESENT METER READING

Thermal Power Station

I

24=00 HrsREADING DATE

AUX. CONSUMPTION BY UATs

II

I

III

I

II

SL NO.

11/30/2020ADJUSTMENT FOR

TESTING & CALIBRATION( IN MWh)

DIFFERENCE

Minutes of 76th OCCM of MP 60