MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]
Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in
No.07-05/SG-9B-II/324 Jabalpur, dated:12.02.2021
To
As per distribution list
Sub: Minutes of 76th meeting of Operation and Coordination Committee of MP.
…
The Minutes of 76th meeting of the Operation and Coordination Committee of MP held on
23rd December 2020 has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and
can be downloaded. It is also to intimate that due to outbreak of Covid-19 and as per
precautionary measures the 76th OCC is being conducted through video conferencing.
(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur
Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-
[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-
[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-
[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,
Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-
[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –
[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-
[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-
[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,
Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,
Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,
Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near
Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –
[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –
[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,
[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –
462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical
Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-
9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa
(MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP)
– 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].
24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551,
Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina-
470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],
26. The General Manager Operation Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt.
Hoshangabad, Email – [email protected] , [email protected] .
27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,
Email- [email protected], Indore – 452010, [email protected]
The 75th meeting of Operation & Coordination Committee of MP was held on 23rd DECEMBER 2020
at 11:00 AM through video conferencing. The list of participants is enclosed as Annexure -1.0.
Shri. R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM welcomed all the guests &
participants attending the 76th OCCM of MP. Member Secretary OCC stated that the demand of MP has
increased due to ongoing Rabi season and the high demand is being meet safely with the coordination and
cooperation of each entity the without any disturbance or constraint in the system.
Thereafter the agenda points were taken up, which are narrated here under: -
ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 75TH meeting of Operation & Coordination Committee of MP held telephonically, on 06th October 2020 were forwarded to the committee members vide
No. 07-05/SG-9B-II/2057 Jabalpur dated 18.12.2020. No comments have been received. Committee confirms the minutes.
ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS SEPTEMBER 2020 TO NOVEMBER 2020.
2.1. Frequency Particulars: The committee was apprised that during SEPTEMBER 2020 the system
frequency was below 49.90 Hz for 4.23% of time against 3.91% of time during OCTOBER 2020. The system
frequency was above 50.05 Hz for 11.54% of time during SEPTEMBER 2020 against 14.21% of time during
OCTOBER 2020. The system frequency was within the IEGC range of 49.90-50.05 Hz for 84.23% of the time
during SEPTEMBER 2020 against 81.87% of time during OCTOBER 2020. The average monthly frequency
was 50.00 Hz during month of SEPTEMBER 2020 and 50.00 Hz during month of OCTOBER 2020.
The detailed frequency particulars for the month of SEPTEMBER 2020 TO NOVEMBER 2020 are
enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:-
Month Average frequency
Minimum Integrated frequency over an hour
Maximum integrated frequency over an hour
Instantaneous Minimum Frequency
Instantaneous Maximum Frequency
SEPTEMBER2020
50.00 Hz 49.79 Hz 50.09 Hz 49.64 Hz 50.20 Hz
OCTOBER 2020
50.00 Hz 49.81 Hz 50.11 Hz 49.70 Hz 50.27 Hz
NOVEMBER 2020
49.84 Hz 49.84 Hz 50.08 Hz 49.68 Hz 50.27 Hz
2.2 Operational Matters
2.2.1 Operational Discipline: The committee was apprised that System operated in terms of frequency
profile for the months SEPTEMBER 2020, OCTOBER 2020 & NOVEMBER 2020 is as given below for
discussion by the committee:
Month % of time Frequency Below 49.90 Hz
% of time Frequency above 50.05 Hz
% of time frequency within the permissible range of 49.90-50.05 Hz.
Average monthly frequency
MINUTES FOR 76th MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 23rd DECEMBER 2020 AT 11:00 AM THROUGH VIDEO CONFERENCING.
Minutes of 76th OCCM of MP 1
SEPTEMBER 2020
4.23% 11.54% 84.23% 50.00 Hz
OCTOBER 2020
3.91% 14.21% 81.87% 50.01 Hz
NOVEMBER 2020
4.53% 15.65% 79.82% 50.01 Hz
2.2.2 Voltage Profile: The committee was apprised about the maximum and minimum voltage as recorded at
important 400 KV s/s in MP Grid from SEPTEMBER 2020 to NOVEMBER 2020 is enclosed as Annexure –
2.2.2. Committee was informed that voltages at 400KV S/s Kirnapur was high and the issue of high
voltage at 400KV S/s Kirnapur shall be resolved after installation of reactor and the work shall be
expedited.
2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised about the
updated information of the status of capacitor banks in sub-transmission system as on 31th MARCH 2020 as
submitted by DISCOMs is detailed below:
Discoms were requested to identify the low voltage pockets and the future plan for addition of
capacitor bank to resolve the issue of low voltage.
2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The
committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in
EHV transmission system as on 30.11.2020 as submitted by MPPTCL is given below: -
Voltage
Class
Capacitor bank
installed as on
31.08.20(MVAR)
Capacity Added
after Last OCC
Meeting (MVAR)
TOTAL
CAPACITY AS
ON 30.11.2020
(MVAR)
Capacitor Bank
Installed but
defective & are not
repairable (No &
MVAR)
220 KV 100.00 0.00 100.00
All in Service
132 KV 1238.00 0.00 1238.00
33/36 KV 5695.00 72.00 5767.00
TOTAL 7009.00 0.00 7105.00
DIS
CO
M
Capacitor bank
installed in good
condition (No)
Capacitor
Banks healthy
but not in
service due to
control ckt
problem
Capacitor bank
installed but
defective & are
repairable (No)
Require
ment of
repair
against
each
unit (No)
Requiremen
t against
non-
repairable
capacitor
banks
Capacitor
banks already
covered under
ADB T-V
Balance
capacitor
banks to be
covered in
other
schemes
600
KVAR
1200
KVAR
1500
KVAR
1800
KVAR
600
KVA
R
1200
KVA
R
1500
KVA
R
600
KVAR
1200
KVAR
1500
KVAR
No of 100
KVAR
Units
required
600
KVAR
1200
KVAR
600
KVAR
1200
KVAR
600
KVAR
1500
KVAR
EZ 410 134 109 - 1 7 - 10 6 0 - 34 7 0 0 - 0
CZ 0 620 1032 63 - - - 0 0 0 NIL 0 0 0 0 0 0
WZ 601 511 750 - 1 7 4 19 30 60 438 09 19 0 0 - 0
Minutes of 76th OCCM of MP 2
The plan for installation of capacitor banks installed at EHV Transmission Substation is enclosed as Annexure-2.2.4.
2.2.5 U/F and df/dt Relay Operation
(i) U/F and df/dt Relay Operation: The committee was apprised that the Frequency did not touch 49.20 Hz
from OCTOBER 2020 and NOVEMBER 2020. There was no df/dt operation during the same period.
MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation.
(ii) Defective u/f, df/dt Relays: The committee was apprised that MPPTCL has informed that All the df/dt
and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed
for under frequency operation. At 132KV S/S Chapda the df/dt protection is provided through df/dt feature
of DPR. All U/F stages are in good/ healthy & working condition.
2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33
KV feeders: (i) Details of DISCOM wise Power supply given to various domestic categories during the period
SEPTEMBER 2020 TO NOVEMBER 2020 is enclosed at Annexure 2.3(i).
(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised
about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV
substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details
of pending group allocation to 33 KV feeders is given below:-
SN DISCOM Region No of 33 KV feeders for which groups
to be allocated
01
EAST
Jabalpur 14
02 Sagar 00
03 Rewa 00
04 Total 14
05
WEST
Indore 05
06 Ujjain 04
07 Total 09
08
CENTRAL
Bhopal 13
09 Gwalior 00
10 Total 13
TOTAL Grand Total 36
Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.
In view of the above it is requested that the order copy for which group have been allocated may
please be submitted to P&D, MPPTCL under intimation to SLDC.
ITEM NO. 3 : OPERATIONAL PLANNNING:
Minutes of 76th OCCM of MP 3
3.1 Generating Units under planned outage and proposed maintenance program: The latest status for
annual maintenance /outages of thermal generating units of MPPGCL for FY 2020-2021 as provided by
ED(O&M:Gen) for the month OCTOBER-2020 to NOVEMBER-2020.
Details regarding hydel unit outage has not been provided by CE (O&M:Hydel), MPPGCL.
[Committee May like to note]
3.2 Proposed shutdown program of Transmission lines / Transformers: The proposed shutdown of
transmission elements for the period 01.06.2021 to 31.03.2021 as submitted by T&C, MPPTCL is enclosed as
Annexure-3.2. [Committee May like to discuss]
3.3 Long Outages of transmission elements and protections: The committee was apprised about the
status submitted by MPPGCL /MPPTCL are given below:-
Sr.
No
Line/Transformer/ etc
under long Outage
Outage date Reason Response from Utility
1
40MVA BHEL make transformer Sl. No. 2038553 at 132KV S/S Berasiya.
05‐03‐20 H/T due to oil parameters are beyond acceptable limits
Transformer charged on 09.07.2020.
2
160MVA BBL make transformer Sl. No. 5563-02 AT 220 KV S/S Datia
20‐07‐20
X’mer tripped Differential & Buchholz trip indications
X’mer replaced by another 160MVA transformer on 28.10.2020
3
160MVA AREVA make Transformer ,Sl. No. B‐30239 at 220KV S/S Jaitpura (Indore‐II).
07.02.2020 Multiple feeder fault and DC problem
Transformer declared failed and replaced by 160MVA transformer on Dtd‐30.09.2020.
4
220/33KV 50MVA BBL make transformer Sl. No. 5685-03 at 400KV S/s Ashta
23‐08‐20
X’mer tripped Differential & Buchholz trip indications
X’mer replaced by another 50MVA transformer on 24.10.2020.
5
40MVA, 132/33KV ANDREW YULE X’MER S.NO.1247 AT 132KV S/S SEHORE.
30.10.2020 X’mer hand tripped after Buchholz alarm indication.
MPPTCL informer that X’mer found defective in testing and replaced by another 50MVA X’mer on 01.12.2020.
6
20MVA 132/33KV GEC X’MER AT 220KV S/S TIKAMGARH S.NO. B-24042
09.11.2020
X’mer tripped Differential & Buchholz trip indications
MPPTCL informed that transformer found defective in testing. X’mer charged on 12
7 50 MVAR (Make GE) Line Reactor at 400KV Sarni‐Asta Ckt‐I.
31.03.2018
Under outage since
31.03.18 due to
concentration of
Acetylene gas. DGA test
of transformer oil of
reactor was carried out
M/s GE(T&D) India (OEM) deputed their team on dtd‐30.10.2019 for internal inspection of reactor. After inspection corona ring of reactor found damage. Tender opened on 07.02.2020 & correspondence is going on with the firm. Presently
Minutes of 76th OCCM of MP 4
by M/s CPRI, Bhopal. work is under progress. MPPGCL informed that X’mer will be in service by March‐2021.
Any transmission element/ EHV element under outage, which has not been intimated/included under
aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same.
The utility may submit the latest status.
ITEM NO. 4 : OPERATIONAL STATISTICS FROM SEPTEMBER 2020 TO NOVEMBER 2020: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of
MPPGCL & NHDC Hydel Units.
Annex. 4.2 Power Supply Position(Energy Balance Sheet).
POWER SUPPLY POSITION FOR THE MONTH : Sep 20
All Fig in MW
Particulars
Max Dem Met on :
10-Sep-20 AT : 09-30
Average 01-10 Sep
Average 11-20 Sep
Average 21-30 Sep
Average Monthly
STATE PEAK DEMAND MET 10103 8581 9068 7716 8432
BREAKUP :-
STATE THERMAL (Actual Gen) 1940 1125 1998 1681 1601
STATE THERMAL (RSD) Total MW
0 1812 1520 1481 1604
STATE HYDEL 1941 1905 1945 1880 1910
IPP (STATE) 164 84 165 159 136
CENTRAL SECTOR (Schedule) 3701 4171 3683 3376 3743
CENTRAL SECTOR (Surrender) 2228 2050 1358 1421 1610
IPP (INTER STATE) 2502 2347 2230 2105 2227
RAILWAY 163 165 183 188 179
RENEWABLE ENERGY 815 495 563 617 560
OTHERS -277 -93 -158 -166 -139
BANKING / PURCHASE / SALE -962 -1269 -1240 -1230 -1247
DEVIATION 15 -21 -110 -109 -80
DEVIATION (AVERAGE) Between (-603 to 742)
Between (-714 to 534)
Between (-784 to 502)
Between (-784 to 742)
ENERGY SUPPLY STATE (LU) 2185.00
Minutes of 76th OCCM of MP 5
POWER SUPPLY POSITION FOR THE MONTH : Oct 20 All Fig in MW
Particulars
Max Dem Met on : 31-Oct-20 AT :
09-15
Average 01-10 Oct
Average 11-20 Oct
Average 21-30 Oct
AverageMonthly
STATE PEAK DEMAND MET 12546 8980 9877 10334 9750
BREAKUP :-
STATE THERMAL (Actual Gen) 2954 1567 2277 2631 2174
STATE THERMAL (RSD) Total MW
0 1458 708 129 745
STATE HYDEL 1139 947 888 668 829
IPP (STATE) 458 171 275 339 264
CENTRAL SECTOR (Schedule) 3538 3413 3525 3762 3573
CENTRAL SECTOR (Surrender) 682 1237 612 1000 951
IPP (INTER STATE) 2875 2400 2555 2512 2490
RAILWAY 211 192 188 202 194
RENEWABLE ENERGY 922 679 552 498 574
OTHERS -237 -163 -268 -284 -240
BANKING / PURCHASE / SALE 634 107 341 520 329
DEVIATION -24 -61 -79 -94 -78
DEVIATION (AVERAGE) Between (-578 to 385)
Between (-727 to 447)
Between (-986 to 753)
Between (-986 to 753)
ENERGY SUPPLY STATE (LU) 2572.15
POWER SUPPLY POSITION FOR THE MONTH : Nov 20 All Fig in MW
Particulars
Max Dem Met on : 30-Nov-20 AT :
08-45
Average 01-10 Nov
Average 11-20 Nov
Average 21-30 Nov
Average Monthly
STATE PEAK DEMAND MET 14234 11136 11207 10234 10839
BREAKUP :-
STATE THERMAL (Actual Gen) 2828 2848 2530 2468 2616
STATE THERMAL (RSD) Total MW
0 144 236 236 205
STATE HYDEL 1609 426 634 634 565
IPP (STATE) 481 342 335 337 338
CENTRAL SECTOR (Schedule) 3482 3902 3979 3622 3834
Minutes of 76th OCCM of MP 6
CENTRAL SECTOR (Surrender) 509 1177 870 1211 1086
IPP (INTER STATE) 2876 2442 2427 2425 2431
RAILWAY 233 220 228 236 228
RENEWABLE ENERGY 782 439 541 720 572
OTHERS -264 -293 -284 -300 -293
BANKING / PURCHASE / SALE 2124 1377 1421 1414 1404
DEVIATION 82 -115 -167 -127 -136
DEVIATION (AVERAGE) Between (-1295 to 742)
Between (-1380 to 382)
Between (-917 to 674)
Between (-1380 to 742)
ENERGY SUPPLY STATE (LU) 2729.61
Annex. 4.3 Hourly Average of Availability and Demand.
Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.
ITEM NO. 5: SYSTEM DISTURBANCE IN MP FOR SEPTEMBER 2020: The Grid
Disturbances and Grid Incidents in MP during these months are given in Annexure 5.
ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-
6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF
REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and
commissioning of reactors / transmission elements is as below:-
S.No. 400 KV S/s Size MVAR Implementi
ng Agency
Expected Date of Commissioning
as intimated in last OCC
1. Line Reactor on 400 kV Satpura–ISP line at STPS
50 MVAR MPPGCL
Grant for the scheme for installation of 50MVAR line reactor at Sarni-ISP feeder of 400KV switchyard of Satpura has been sanctioned by MoP, GoI on 22.05.17. After extending the dates only single offer has been received which is under evaluation.
2. Bus Reactor at SSTPS 125 MVAR MPPGCL Charged on 21.12.2020.
The latest status may be submitted in the meeting.
6.2 COLLECTION OF DATA AND INFORMATION FOR DETERMINATION OF INTER-
STATE TRANSMISSION CHARGES AND LOSSES- PROCEDURE THEREOF:- The
Minutes of 76th OCCM of MP 7
committee was apprised that as per Regulation 23(1) of the Sharing Regulations 2020, the Implementing
Agency (IA) has published detailed procedures along with data formats for collection of data and information
from Designated ISTS Customers (DICs), ISTS Licensees, Regional Load Dispatch Centers (RLDCs), State
Load Dispatch Centers (SLDCs), Central Transmission Utility (CTU) and State Transmission Utility (STUs) /
non-ISTS licensees whose assets have been approved by CERC as being used for inter-State transmission,
for Implementation of the provisions of Sharing Regulations 2020 after stakeholder consultation.
‘DIC’ means the user of any transmission element(s) of the Inter-State Transmission System (ISTS) and
shall include generating station, State Transmission Utility (STU), distribution licensee including State
Electricity Board or its successor company, Electricity Department of State and any other entity directly
connected to the ISTS and shall include an intra-State entity or a trading licensee that has obtained
Medium Term Open Access or Long-Term Access to ISTS;
DATA AND INFORMATION TO BE SUBMITTED BY ALL DICS:
All DIC’s shall submit the following data to the Implementing Agency as well as to the respective RLDCs
by 7th day of each billing month in the prescribed formats enclosed with this procedure:
(i) Basic Network data along with the network connectivity diagram corresponding to peak block (an updated
geographical power map/ single line diagram, indicating the lines which are kept open from end and bus
split arrangement (if any).
(ii) Total actual injection and withdrawal (MW and MVAr) data at various nodes or group of nodes for the
notified peak block of the billing period.
(iii) Details of long-term access and medium-term open access along with details of buyers for the billing
period
The Basic Network shall comprise of the entire electricity system, electrical plants and/ or transmission
lines at voltage levels of 110 kv and above and all the generators connected up to 110KV level
corresponding to Peak Block identified and published by IA. In the States where voltage level next to
220kv/ 230kv system is 132 kv, data of entire network up to 132kv level is to be furnished. Power flow into
a lower voltage system from the voltage levels indicated in the definition of the Basic Network shall be
considered as load at that sub- station. Power flow from a lower voltage system into the electricity
systems at the voltage levels indicated in the definition of the Basic Network shall be considered as
generation at that sub-station
If any DIC fails to submit the data as required within the stipulated time frame, IA shall compute
transmission charges based on the data available from other alternate sources as per Regulation 24(5) of
Sharing Regulations 2020.
FOLLOWING IS PROCEDURE FOR PROVIDING DATA AS DESCRIBED IN REGULATION:
In case of drawal DIC’s, total drawal of a DIC shall be computed based on SEM data for the peak
block. Where SEM data is not available, SCADA data shall be used. DIC should provide node wise data
Minutes of 76th OCCM of MP 8
as per the Regulations. Where DIC shall not provide node wise data within stipulated time period,
apportionment of loads in different nodes of DIC shall be considered in proportion to the node wise data
submitted by DIC for the most recent TTC/ATC computation PSSE base case/ recently submitted updated
base case data by the states for peak scenario.
CONSIDERING THE PROVISIONS OF REGULATION FOLLOWING PROCEDURE SHALL BE
IMPLEMENTED FOR PROVIDING DATA TO IMPLEMENTING AGENCY:
1. SLDC shall provide node wise SEMS data which are available to SLDC till 5th of every month to
nodal officer for this purpose for providing data to implementing agency. For the
injection/withdrawal nodes, for which SEMs data are not available, SLDC SCADA data shall be
provided by SLDC
2. Further, Transco SCADA data for missing withdrawal nodes shall be provided by CE(P&D) in
coordination with CE(T&C). It is also to mention that if any data is not available at SLDC &
Transco SCADA then P&D shall obtain the data from CE(T&C). This arrangement shall continue
till, MPPTCL will make arrangement to provide/communicate SEMS data of all nodes to SLDC up
to 3rd of every month. The CE(T&C) shall take initiative in war footing to make SEMS data of all
withdrawal nodes make available to SLDC up to 3rd of every months. Similarly, all generators
shall also make such arrangement. Further MPPGCL is also requested to ensure to provide
SEMS data of the generating stations to SLDC by 3rd of every month.
3. Nodal officer o/o CE(P&D) shall communicate the consolidated data to implementing agency in
prescribed format till 7th of every month.
Representative from SLDC briefed the committee about the complete procedure. It was decided
in the meeting that an Officer not below Superintending Engineer rank shall be nominated each from
offices for ensuring that the data is made available to concern officers within stipulated time period.
6.3 FREQUENT ABNORMAL OPERATIONS OF RELAYS AT TONS HPS:- The
committee was apprised that on dated 27.10.20, around 11.59 hrs, 220kv Tons- Kotar Ckt 1 tripped with
following indications:
Kotar - B-ph, Z-1, 15.9 KM, 5 KAmps
Tons HPS- B-ph, Z-1, 21 KM (As reported ckt breaker not tripped)
During the time of tripping the Bus arrangement at Tons HPS was as mentioned below: -
Bus 1- Kotar ckt 1, Rewa ckt , Unit 1
Bus 2- Kotar ckt 2, Sirmour ckt , Unit 2, 20 MVA X-mer
As reported, Bus bar protection operated at Bus 2 at Tons HPS., but from the indications and
arrangements mentioned above, it may be seen that 220kv Tons- Kotar ckt 1 was on Bus 1 in which fault was
occurred, however it is not understood that how the element situated at Bus 1 creating bus fault on another
Minutes of 76th OCCM of MP 9
bus? There may be some mal operation of protection relays and also problem in relay coordination may not be
ruled out. Similarly at 14:12HRS. on dated 26/11/2020 Bus Bar Protection operated at TONS HPS and due to
this all connected element tripped from TONS PH end without any indication..
The issue of frequent abnormal operations of relays at Tons HPS was previously raised many times,
also in letter referred above, the false trippings at Tons end and relays at Tons end sensing the faults of far
end was brought into notice. But despite this, no concreate result on the matter observed till date and the
trappings are still persisting.
These type of false trippings are dangerous to the system. It is requested to please look into the
matter and get the reason investigated, so that any mal operation can be rectified. It is also requested that
relay co-ordination may also be reviewed at Tons end and all relays at Tons HPS be tested properly.
Remedial action taken to prevent such multiple false trippings be informed to this office.
Representative from MPPGCL intimated that the process of protection coordination of EHV elements
(lines/transformers) at all Power houses is in process in coordination with CE(T&C). The matter was discussed
in the meeting.
6.4 ENABLING THE AUTO RE-CLOSURE FACILITY AT PGCIL SUBSTATION END
ON 220 KV LINES OF MPPTCL:- The committee was apprised that as per Regulation 43(4) (c) –
Schedule-V (1) (f) of CEA (Technical Standards for Construction of Electric Plants and Electric Lines),
Regulation-2010, availability and healthiness of Auto Re-closure feature must be ensured on 220 KV and
above EHV lines. However, there are 50 Nos of 220 KV lines of MPPTCL are drawing power through PGCIL
network for catering consumers load of MP, PGCIL has not enabled/ provided Auto Re-closure facility at their
end on 26 Nos of 220 KV lines. Whereas MPPTCL has provided Auto Re-closure facility on all the 26 Nos of
220 KV lines at MPPTCL end (list enclosed). As, MP is drawing 50% to 70% its requirement from the drawl
point located in PGCIL network. Non availability of Auto Re-closure facility at PGCIL end makes the State Grid
vulnerable.
This matter has already been discussed during 537th OCCM of WR. Representative of PGCIL has agreed to
provided Auto Re-closure facility at their end and requested to advice MPPTCL for pursuing the matter with
concern PGCIL substations for making arrangement for providing Auto Re-closure feature at PGCIL end &
ensured that PGCIL shall do needful in the issue. Considering the above, CE -T&C is requested to instruct
respective circles for taking up the matter with PGCIL Sub-Stations for enabling the Auto re-closure facility at
PGCIL substation end on 220 KV lines of MPPTCL.
In view of above Members of Sub -Committee has discussed the matter and representative of o/o
CE (T&C) was requested to peruse the matter with respective PGCIL substations so that Auto re-closure
facility may be enabled at PGCIL substation end on 220 KV lines of MPPTCL
CE(T&C) was requested to provide the updated status of the Auto Re-closure schemes within 15 days to
SLDC. The matter was discussed in the meeting.
Minutes of 76th OCCM of MP 10
6.5 ABSORPTION / INJECTION OF REACTIVE POWER BY GENERATORS: - The
committee was apprised that during the less system demand period the voltage profile is expected to be high.
The problem of high voltages becomes severe during night/off peak hours. It is therefore desired that
generating stations to ensure absorption of reactive power from grid with their capability curve to maintain
voltages within operational limit whenever the necessity arises. Similarly, voltage profile is expected to below
due to high system demand, it is desired that generating stations to ensure injection of reactive power from
grid with their capability curve. Similarly, reactors / capacitors shall be switched on/off as per requirement.
The matter was discussed in the meeting.
6.6 UPLOADING OF TRIPPING ON WRLDC TRIPPING PORTAL:- The committee was
apprised that as intimated by WRLDC in 529th WR-OCCM, that WRLDC has started a tripping portal from
01.06.2019 for uploading FIR, DR/EL and other details related to the tripping of all 400KV elements, important
grid elements, inter-state/inter-regional links and lines connected to PGCIL. Further details major Grid
Disturbance resulting in significant load loss/generation loss is also required to be uploaded on the WR-Portal
and as per IEGC 54.2(r), utilities need to submit the data within 24 hours of the event. The link
(https://portal.wrldc.in/Trippingnew/Account/Login.aspx), common user ID & password for the entities of MP
has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019.
As advised in 537th WR-OCCM, all Utilities are requested to use and submit the data through the
WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details
related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within
stipulated time.
The matter was discussed in the meeting.
6.7 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE
ELEMENTS:- The committee was apprised that in compliance to the IEGC & WRLDC operating procedure
the protection coordination of the existing elements & adjacent substations shall be prior to integration of new
intra state elements. All the concerned entities are requested to ensure/review the protection coordination of
adjacent substations/elements and confirm the same along with the first-time charging documents for intra
state elements also.
The matter was discussed in the meeting.
6.8 STATUS OF 125 MVAR SWITCHABLE BUS CUM LINE REACTOR AT 400 KV S/S
SAGAR: - The committee was apprised that the 125 MVAR switchable bus cum line reactor at 400 KV S/s
Sagar was commissioned and first test charge at 00:41Hrs. on 04.03.2020 as Bus reactor. Thereafter the
reactor was switched OFF at 01:23Hrs./04.03.3030 due to non-availability of requisite approval of Standing
Committee.
In the above matter it is to mention that during the summer/rainy season/low load season the voltage
of the system was high and during the prevailing high voltage at Sagar the proposal for taking the 125MVAR
Minutes of 76th OCCM of MP 11
reactor at 400KV S/s Sagar in service was sent to WRLDC. But due to non availability of requisite Standing
Committee approval the charging of the reactor was not permitted by WRLDC.
In view of the above P&D, MPPTCL is requested to provide the status of approval of standing
Committee for 125MVAR Bus cum line reactor so that the reactor may be taken in service as per the system
requirement. It is also requested to clarify that the reactor will be used as a bus reactor or line reactor or can
be used as both in accordance to the Standing Committee approval. Moreover, it may also be clarify when 125
MVAR reactor shall be used as Bus reactor, at the same time whether 400 kv Sagar -Satna line shall be
available or required to be kept off.
P&D informed that the matter is being taken up with CEA. Further SLDC stated that the issue shall be
resolved on priority basis.
6.9 ROSTERING OF IRRIGATION LOAD (PLAN FOR LOAD MANAGEMENT):‐ The
committee was apprised that for load management purpose and for providing quality supply to irrigation
consumer rostering of 11KV feeder are being done by Discom. In this context during this rabi season flexi plan
has been implemented by bifurcating irrigation load in 3 groups. The loading of few s/s has been recorded
significantly high in the range of 90% and above the details are enclosed as Annexure-6.9. Considering the
loading of the transformer discoms are requested to implement flexi plan such that loading of the transformer
remains within permissible limit.
Committee was informed that in Central Discom the loading of Bina & Gwalior area increases
abnormally after 16:00 Hrs. which is the ICT’s of Bina, Gwalior & Morena-Adani are overloaded. The CE (T&C)
has also shown concern regarding over loading of Transformer in few pockets.
Member Secretary OCC stated that if any Discoms is making any changes in supply plan then it shall
be done in coordination with transmission so as to avoid any overloading/disturbance in EHV network.
ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS:
Black Start mock drill of Hydel stations of MP:- The committee was apprised that during 2020-2021 Black
Start Mock Drill at Bargi HPS & Birsinghpur HPS has been conducted successfully on dtd- 15.12.2020 &
21.12.2020 respectively.
The proposed / tentative dates for conducting black start mock drill at various Hydel power station of
MP is detailed as mentioned below:-
S.NO. NAME OF HPS PROPOSED/TENTATIVE DATE
OF MOCK DRILL
1. PENCH HPS 24.12.2020
2. RAJGHAT HPS 05.01.2021
3. MADIKHEDA HPS 06.01.2021
4. TONS HPS 12.01.2021
5. ISP HPS DATES FOR MOCK DRILL MAY
Minutes of 76th OCCM of MP 12
6. OSP HPS
BE PROPOSED BY NHDC FOR
THE MONTH OF MARCH 2021.
COMMITTEE MAY LIKE TO
DISCUSS.
ITEM NO. 8: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 PROVIDING METER DATA TO NLDC FOR COMPUTATION OF INTER STATE
TRANSMISSION CHARGES & LOSSES:- SLDC representative informed that CERC has notified
(Sharing of Inter State Transmission Charges & Losses) Regulations, 2020 dated 04th May 2020 which has
come into force from 01st November 2020. In compliance of regulations, NLDC computes Inter State
transmission charges and losses every month for which node wise injection & drawal recorded in ABT meters
at a particular block in previous month is required to be provided by SLDC prior to 7th of every month. In
compliance of CERC regulations, all Intra State entities of MP are required to carry out folling activities-
1. All state entities shall ensure that at inter-face meters installed under their jurisdiction, AMR facility is
provided for data downloading at SLDC and should be functional at all the time. Any new Inter-face
meter installed in future, shall be capable of transmitting data to SLDC through AMR system installed at
SLDC.
2. In case of some of the meter’s data is not received through AMR, the state entity shall manually
download the data and send through e-mail [email protected] within one day on request of
SLDC.
3. All state entities shall furnish injection / drawal JMR data on 2nd day of every month through e-mail
[email protected] to SLDC for checking / verification / assessment of meter data.
4. All the Intra State entities are requested to instruct the nodal officers appointed for providing data to
SLDC to furnish the missing meter data within one day and JMR data by 2nd day of every month.
SLDC representative requested to MPPTCL, MPPGCL, Discoms, NHDC, IPPs and Railway to issue
necessary instructions to concerned officials for compliances of above regulatory provisions.
8.2 TESTING & CALIBRATION OF METERS AND TIME DRIFT IN ABT METERS
INSTALLED AT THE INTERFACE POINTS:-
1. SLDC representative requested CE(T&C) office to apprise about the status of testing / calibration of
interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of
meter) Regulation 2010 to the committee and request made by SLDC vide U.O. note no. 195 dated
11.11.2020. CE(T&C) office representative informed that first replacement of ABT meter which are older than
Minutes of 76th OCCM of MP 13
10 years shall be carried out and thereafter meters testing / calibration of balance interface meters shall be
carried out by MPPTCL.
2. SLDC representative informed that the list of ABT meters installed at the interface points of T-D having
time drift has been sent to CE(T&C) Office vide email dated 16.03.2020 & UO note no. 191 dated 29.10.2020
and requested to take up the matter with M/s Secure Meters Ltd. for time synchronization with GPS. However,
till date meters are not time synchronized with GPS. CE(T&C) office is requested to apprise the status of time
synchronization of meters. CE(T&C) office representative informed that letter No 04/04/TC-AMR/3985 dated
18.03.2020 is issued to M/s Secure Meters Ltd., Udaipur for time synchronization in ABT meters installed at
the interface points and CE(T&C) office is also issuing instructions to field offices for time synchronization in
coordination with M/s Secure Meters Ltd.
8.3 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM
AND JMR:- No representative of Railways has attended the meeting. SLDC representative requsted
CE(T&C) office to issue instructions to field offices for providing load survey data of 22 Nos. ABT meters
installed at TSS end which are not communicating with SLDC AMR system in coordination with Railways.
8.4 NON- RECEIPT OF ABT DATA OF ISP AND OSP THROUGH AMR SYSTEM:- SLDC
representative informed that ABT meter data of ISP & OSP HPS is not being received through AMR system
since last 3-4 months. ISP & OSP were requested to coordinate with M/s Secure Meters Ltd. (Contact Person
– Shri Abhishek Yadav M- 8120320576) for integrating the meters with AMR system of SLDC,however the
issues are not resolved so far. ISP & OSP representative informed that they will coordinate with M/s Secure
Meters Ltd. and SLDC for resolving the problems related with downloading of meter data through AMR system
of SLDC.
8.5 NON- RECEIPT OF JMR DATA OF JP BINA POWER HOUSE:- SLDC representative
requested to JP Bina TPP to furnish the JMR data in the format enclosed as Annexure-I of ABT meters
installed at GT-I & II, ST-I&II and outgoing feeders by 2nd day of every month for checking / verification of
meter data. JP Bina representative assured that JMR data in standard format shall be furnished to SLDC by
2nd day of every month.
8.6 PROVIDING AMR FACILITY AT GT-I & II, ST-I AND NON- RECEIPT OUTGOING
FEEDERS ABT DATA OF THROUGH AMR SYSTEM OF BLA POWER HOUSE:-No
representative from BLA Power Pvt. Ltd. has attended the meeting, therefore issue could not be discussed.
Minutes of 76th OCCM of MP 14
8.7 TESTING & CALIBRATION OF INTERFACE METERS AND MISMATCH IN
GENERATION OF OUTGOING FEEDERS AND GT &ST:-
1. SLDC representative informed that it was already requested in the previous OCCMs to MPPGCL to
conduct testing / calibration of main, check and standby meters installed at the interface points of power
stations as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of
meter) Regulation 2010. He requested MPPGCL to apprise the Committee about the status of Testing /
Calibration as per regulatory provisions and to ensure that meters installed at the interface points are
time synchronized with GPS. MPPGCL representative informed that Pench HPS testing / calibration of
main energy meter work is completed & Bargi HPS order is under process and assured to conduct the
testing / calibration of meters installed at other Hydel Power Stations and check meters of Thermal
Power Stations. MPPGCL informed that meters installed at the Thermal Power Stations has already
been tested / calibrated. Further, MPPGCL assured to conduct time synchronization of all meters with
GPS.
2. SLDC representative informed that meter installed at outgoing feeder of Birsinghpur, HPS do not record
correct generation due to incorrect measurement of current in one phase since April-2020. MPPGCL
representative informed that order has been placed for replacement CT and replacement shall be done
in next month.
8.8 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF WIND POWER
PROJECTS FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT:- SLDC
representative informed that the concerned SE(O&M)’s do not furnish the monthly injection data of the
following Wind / Solar Power Projects connected at 33KV level. However, SLDC is incorporating the injection
data recorded in ABT meter in SEA, but, verification of data could not be done.
i) 25MW Solar Power Project of M/s Walwahan solar MP connected at 132KV Ratangarh.
ii) 25MW Solar Power Project of M/s Deligentia Energy & Infra connected at 132KV Ratangarh.
iii) 15MW Wind Power Project of M/s Dhar Wind Power Projects Pvt. Ltd. connected at 33KV Dashera
Maidan.
iv) 15MW Wind Power Project of M/s Tirupati Dhar Renewable Power Pvt. Ltd. connected at 33KV Jaitpura
Dhar.
No representative of DCC, Indore has attended the meeting, therefore issue could not be discussed.
Further, SLDC representative inform that the JMR injection data of the following wind & solar
generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC
consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data
could not be done.
i) 49.5MW Wind Power Project of M/s Betul Wind Farm connected at 132KV Gudgaon.
ii) 46MW Wind Power Project of M/s Kukru Wind Farm Pvt. Ltd. connected at 132KV Gudgaon.
Minutes of 76th OCCM of MP 15
iii) 51MW Solar Power Project of M/s Renew Clean Energy P Ltd. connected at 132KV Kohtiya.
SLDC requested CE(T&C) office to issue necessary instructions to field offices for furnishing the JMR data
of the above RE Projects. CE(T&C) office have assured to issue instructions to field offices for furnishing the
JMR data of above mentioned RE Projects by 3rd or 4th of every month connected at 132KV level and above.
8.9 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND
AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC
representative stated that ABT meters installed at the following Pooling Stations of Wind and Solar Power
Project has time drift and thus not recording the correct data. SLDC has requested to QCA / Generators with
copy to concerned licensee vide letter no. 809 & 810 dated 03/06/2020 for time synchronization of the ABT
meters with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC.
Sr. No. FEEDER NAME SUBSTATION ABT METER ZONE
TIME DRIFT
(in minutes)
1 33 KV UJAAS 1 SUSNER 132 KV SUSNER XB571653 WZONE 225.00
2 33 KV SHANKHESWAR WIND
WORLD (DHAMNAR) 220KV S/s DALODA
XC525575
WZONE 180.00
3 33 KV SHANKHESWER WIND
WORLD(NAGRI) 220KV S/s DALODA
XC525573
WZONE 180.00
4 33 KVGIRIRAJ ENTERPRISES,
AFJALPUR 33/11KV S/s AFJALPUR
XC502289
WZONE 180.00
5 33 KV SUDHEER PROJECTS PVT
LTD, BERCHA 132KV S/S BERCHHA
XC529837
XC529839 WZONE 180.00
6 33 KV SUDHEER PROJECTS PVT
LTD MAXI 132KV S/S MAXI
XC529834
XC529832 WZONE 180.00
7 33 KV RENEW WIND ENERGY (MP
TWO) PVT LTD DALODA 220KV S/s DALODA XB593636
WZONE
54.00
8 132 KV GLOBUS STEEL_N_
POWER PVT LTD 132KV S/s SITAMOU
XC562469
WZONE
45.00
9 132 KV RENEW SOLAR ENERGY
(TN) PVT. LTD. 132KV S/S VIJAYPUR
MPC68357
WZONE
26.00
Minutes of 76th OCCM of MP 16
10 33 KV DELIGENTIA CKT-I 132KV S/S RATANGARH
MPC72366
WZONE
25.00
11 33 KV DELIGENTIA CKT-II 132KV S/S RATANGARH
MPC72365
WZONE
21.00
12 33 KV INOX WIND INFRA BETUL
132KV S/S GUDGAON
XB570699
CZONE
19.00
13 220KV INOX LAHORI FEEDER II 220KV S/S SHAJAPUR
MPC73530
WZONE
18.00
14 132 KV ORANGE BERCHA WIND
POWER PVT LTD 220KV S/S BARNAGAR
XC576471
WZONE
17.00
15 33 KV VIVAAN SOLAR -2 MAKDON
132KV S/S MAKDON
XC529587
WZONE
17.00
16 132 KV WIND WORLD (INDIA) LTD.,
RATADIA HILL AT BAGDI III 132 KV JAORA
MPE53467
WZONE
17.00
17 220KV MARUTSHAKTI FEEDER-I
220KV S/S NIPANIYA
MPC70479
WZONE
16.00
18 132KVGAMESA WIND
FATANPUR-II 220KV S/S DEWAS
XC548502
WZONE
14.00
19 132 KV M/s WAANEEP Solar Pvt. Ltd
132KV S/S ICHHAWAR
XC502683
WZONE
14.00
20 132KV GAMESA FEEDER I
220KV S/S SHAJAPUR
XB587800
WZONE
13.00
21 33 KV FINSURYA SOLAR ENERGY
(10MW) 132KV S/S MAKDON
XB581186
WZONE 12.00
22 220KV INOX_LAHORI FEEDER I
220KV S/S SHAJAPUR
MPC73532
WZONE 12.00
23 132KV GAMESA WIND
FATANPUR-I 220KV S/S DEWAS
XC548500
WZONE 12.00
24 220KV MARUTSHAKTI FEEDER-II
220KV S/S NIPANIYA
MPC70481
WZONE 11.00
25 33KV KSHEMA_BHERUGARH
FEEDER-I 132KV S/S BHERUGARH
XD500608
WZONE 10.00
Minutes of 76th OCCM of MP 17
26 33KV DHAR_WIND FEEDER
33/11KV S/S
_DUSSERA_DHAR XD500602
WZONE 10.00
27 33KV KSHEMA_BHERUGARH
FEEDER-II 132KV S/S BHERUGARH
Y0056943
WZONE 9.00
28
132 KV KUKRU WIND 132KV S/S GUDGAON
XC579525
CZONE 9.00
29 33 KV CHOKSI ENERGY & INFRA P
L RINGDOD 132 KV JAORA
Y0056961
WZONE
8.00
30 220 KV CLEAN WIND POWER
(RATLAM) PVT LTD 220KV S/S RAJGARH
MPC74061
WZONE
8.00
31 33KV TODAY CLEAN ENERGY
FEEDER-1 220KV S/S BAROD
Y0116481
WZONE
7.00
32 33KV CHOKSI ENERGY
MAMATHKHEDA
132KV S/S JAORA Y0056963 WZONE 6.05
33 BETUL WIND FARM
132KV S/S GUDGAON MPC62876 CZONE 5.53
34 UJAAS-2 RAJGARH (BIORA)
132KV S/S RAJGARH XC595281 CZONE 5.28
35 33KV DURGA KHANDSARI 132KV S/S PANSEMAL
XD520954 WZONE 5.15
36 132KV RAJKOT_GUJRAT
220KV S/S BAROD XD537568 WZONE 3.80
37 33KV AVP POWER INFRA
FEEDER-II _
132KV S/S SONKATCH
XD595994 WZONE 3.52
38 UJAAS-1 RAJGARH (BIORA) 220KV S/S RAJGARH
BIAORA Y0356649 CZONE 3.48
39 ACME SOLAR ENERGY PVT. LTD 132KV S/S KHILCHIPUR
MPC60957 WZONE 3.40
40 NTPC-1 220KV S/S RAJGARH
BIAORA XC510612 CZONE 3.32
41 NTPC-2 220KV S/S RAJGARH
BIAORA XC510614 CZONE 2.93
Minutes of 76th OCCM of MP 18
42 SKY POWER SOLAR INDIA PVT
LTD
400KV S/S CHHEGAON
MAKHAN Y0322111 WZONE 2.78
43 33 KV FREEWINGS POWER &
INFRA LTD
132KV S/S MAKDON
Y0505422 WZONE 2.57
44 BHARAT ELECTRONICS LTD OFI 220KV S/S ITARSI
Y0510858 CZONE 2.37
45 33KV RENEW_WIND AP4 FEEDER-I 132KV S/S KHACHROD
XD500612 WZONE 2.33
46 33KV RENEW_WIND AP4 FEEDER-
II
132KV S/S KHACHROD
XD500615 WZONE 2.27
47 33KV M P WIND FARM NAGDA HILL 220 KV DEWAS
XE525393 WZONE 2.07
48 FOCAL ENERGY SOLAR ONE INDIA
PVT LTD. (SECI)
132KV S/s SITAMOU
XA110207 WZONE 2.03
49 33KV G.I. POWER
220 KV DEWAS X1071843 WZONE 1.82
50 33KV RENEW WIND ENERGY (MP
TWO) DALODA 220 KV S/s DALODA XC522563 WZONE 1.82
51 AVENGERS SOLAR PVT LTD 132KV S/S SUWASARA
Y0357689 WZONE 2.12
52 132KV GAMESA FEEDER II 220KV S/S SHAJAPUR
XE565677 WZONE 2.12
53 SUNPHARMA POWER BLOCK-6 132KV S/S TARANA
Q0287970 WZONE 2.00
54 220KV DJ ENERGY FEEDER_I 220KV S/S DALODA
XB587788 WZONE 1.47
55 SIMCON FEEDER -2 132KV S/S GANJBASODA
Y0327309 CZONE 1.47
56 33KV UJAAS SAI SABURI 132KV S/S MAKDON
X0888531 WZONE 1.42
57 33KV DESIGNCO 132KV S/S ARNIAKALA
Y0351366 WZONE 1.42
Minutes of 76th OCCM of MP 19
58 33 KV UJAAS-1 BAROD
220KV S/S BAROD XE525398 WZONE 1.32
59 33 KV SUZLON INFRA BEHAPUR-1 220 KV S/s DALODA
XE479862 WZONE 1.32
60 33KV BHARAT ELECTRONICS LTD
VFJ JABALPUR 132KV S/S VFJ Q0238278 EZONE 1.32
61 33 KVBHARAT ELECTRONICS LTD
GCF 33KV SATPULA Q0289517 EZONE 1.30
62 SEI SUNSHINE FEEDER-1 220KV S/S SHIVPURI
Q0289279 CZONE 1.30
63 33 KV UJAAS-2 BAROD
220KV S/S BAROD XE525399 WZONE 1.27
64 SUZLON DEV 1 NAGDA HILL
DEWAS
220 KV DEWAS
XE479868 WZONE 1.20
65 SUNPHARMA POWER BLOCK-1
(Inter)
132KV S/S TARANA
Q0287966 WZONE 1.20
66 33 KV WELSPUN CKT-I 132KV S/S RATANGARH
Q0234478 WZONE 1.17
67 33 KV WIND WORLD-I AGAR
132KV S/S AGAR Q0287979 WZONE 1.17
68 220KV DJ ENERGY FEEDER_I 220KV S/S DALODA
XB587789 WZONE 1.15
69 SUNPHARMA POWER BLOCK-2
(Inter)
132KV S/S TARANA
Q0287960 WZONE 1.12
70 SUNPHARMA POWER BLOCK-4 132KV S/S TARANA
Q0287964 WZONE 1.10
71 SUNPHARMA POWER BLOCK-5 132KV S/S TARANA
Q0287968 WZONE 1.08
72 33 KV SUZLON IV RATLAM
132KV S/S JAORA XE479859 WZONE 1.02
73 33 KV SUZLON III SAILANA 14.1MW
132 KV SAILANA XE479855 WZONE 1.00
Minutes of 76th OCCM of MP 20
Further, SLDC representative informed that ABT meters installed at the following Wind and Solar
Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise
data do not match with midnight data. SLDC has requested to Generators with copy to concerned licensee
vide letter no. 2353 dated 31/08/2019, letter no. 2771,dated 16/10/2019 and letter no. 809 & 810 dated
03/06/2020 for immediate replacement of these ABT meters.
Sr.No. FEEDER NAME SUBSTATION ABT METER No. ZONE QCA NAME
1 33KV SUZLON-I
SAILANA 132 KV SAILANA
XE479853
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
2 33KV SUZLON-II
SAILANA 132 KV SAILANA
XE479854
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
3 33KV SUZLON-III
SAILANA 132 KV SAILANA
XE479855
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
4 33KV SUZLON-I
RATLAM 132KV S/S JAORA
XE479856
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
5 33KV SUZLON- IV
RATLAM 132KV S/S JAORA
XE479859
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
6 33KV SUZLON- V
RATLAM 132KV S/S JAORA
XE479860
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
7 33KV SUZLON-IV
AGAR 132KV S/S AGAR
XE479864
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
8 33KV SUZLON-V
(SUSNER-III) 132KV S/S SUSNER
XE479867
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
9 33KV SUZLON-III
(AGAR- I), 132KV S/S AGAR
XE479863
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
10 33KV SUZLON
BEHAPUR DALODA-I220 KV S/s DALODA
XE479862
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
11 33KV SUZLON
BEHPUR DALODA-II 220 KV S/s DALODA
XE479861
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
12 33KV SUZLON I
(SUSNER-I), 132KV S/S SUSNER
XE479866
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
Minutes of 76th OCCM of MP 21
13 33KV SUZLON I
(SUSNER-II), 132KV S/S SUSNER
XE479865
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
14 33 KV M P WIND
FARM NAGDA HILL 220 KV DEWAS XE525393
WZONE MANIKARAN
ANALYTICS LTD..
15 33 KV SUZLON
GUJRAT WIND PARK220 KV BAROD
XD595984
XD595980
WZONE MANIKARAN
ANALYTICS LTD...
16 33KV FREEWING
POWER PVT. LTD. 132KV S/s MAKDON Y0505422
WZONE FREEWING POWER
LTD.
17 33KV AVP POWER
PVT. LTD. 132 S/s SONKATCH
XD595991,
XD595994
WZONE MANIKARAN
ANALYTICS LTD..
18. 33KV BADONI PVT
LTD. 132KV S/s MAXI XD522128
WZONE MANIKARAN
ANALYTICS LTD..
19. 33KV GI POWER PVT.
LTD. 220KV S/s MAKDON X1071843
WZONE KREATE TECHNOLOGY
PVT LTD
20. 33KV SAI SABURI
MAKDON 132KV MAKDON X0888531
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
21. 33KV UJAAS-I
RAJGARH 220KV RAJGARH Y0356649
CZONE MANIKARAN
ANALYTICS LTD..
22. 33KV UJAAS –I
BAROD 220KV BAROD XE525398
WZONE MANIKARAN
ANALYTICS LTD..
23. 33KV UJAAS –II
BAROD 220KV BAROD XE525399
WZONE MANIKARAN
ANALYTICS LTD..
24. 33KV FRIEND SALT
SUSNER 132KV SUSNER
X0888530
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
25 SUZLON DEV 1
NAGDA HILL DEWAS
220 KV DEWAS
220 KV DEWASXE479868
WZONE RECONNECT ENERGY
SOLUTION PVT LTD
26. 33KV EASTMAN
INTERNATIONAL PVT.
LTD
132KV TARANA X1305766
X1305767
WZONE MANIKARAN
ANALYTICS LTD..
27. 33KV UJAAS-I
RAJGARH 220KV RAJGARH Y0356649
CZONE MANIKARAN
ANALYTICS LTD..
28. SIMCON FEEDER -2
220KV GANJBASODA
Y0327309
CZONE KREATE
TECHNOLOGIES LLP
Minutes of 76th OCCM of MP 22
SLDC representative requested to DDCs, Bhopal to take-up the issue with concerned officials for time
synchronization and replacement of ABT meters. DCCs Bhopal has informed that concerned nodal officer /
SE(O&M) / Commercial Section have been intimated for necessary action. No representative from DCC,
Indore has attended the meeting, therefore issue could not be discussed.
8.10 TESTING & CALLIBRATION OF INTERFACE METERS:- SLDC representative requested
to DCCs, Bhopal to take-up the matter with concerned officials for testing / calibration of meters installed at the
interface points of Renewable Energy Generators and Inter Discom feeders under their jurisdiction as per
Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010.
In response, DCC Bhopal representative informed that concerned officers have already been informed for
necessary action. DCC, Indore representative has not attended the meeting, therefore issue could not be
discussed.
8.11 INTRODUCTION OF G-TAM PRODUCT BY POWER EXCHANGE:- SLDC representative
apprise the Committee that the Green-Term Ahead Market (G-TAM) in electricity launched by Power
Exchange as a first step towards greening the Indian short term power market, it is an alternative
new model introduced for selling off the power by the renewable developers in the open market
without getting into long term PPAs.
Key features of GTAM:
1. Transactions through GTAM will be bilateral in nature with clear identification of
corresponding buyers and sellers, there will not be any difficulty in accounting for Renewable
Purchase Obligations (RPO).
2. GTAM contracts will be segregated into Solar RPO & Non-Solar RPO as RPO targets are
also segregated.
3. Daily & Weekly Contracts – Bidding will take place on MWh basis.
4. Price discovery will take place on a continuous basis, price time priority basis.
Subsequently, looking at the market conditions open auction can be introduced for daily &
weekly contracts.
5. Energy scheduled through GTAM contract shall be considered as deemed RPO compliance
of the buyer.
Significance and benefits of GTAM:
1. The introduction of GTAM platform would lessen the burden on RE-rich States and
incentivize them to develop RE capacity beyond their own RPO.
2. This would promote RE merchant capacity addition and help in achieving RE capacity
addition targets of the country.
Minutes of 76th OCCM of MP 23
3. GTAM platform will also lead to increase in number of participants in renewable energy
sector.
4. It will benefit buyers of RE through competitive prices and transparent and flexible
procurement.
5. It will also benefit RE sellers by providing access to pan- India market.
8.12 RPO OBLIGATION SETTLEMENT THROUGH RE-DSM POOL ACCOUNTS:- SLDC
representative apprise the Committee about the RPO Obligation Settlement as per MPERC (Forecasting,
Scheduling and Deviation Settlement Mechansim and related matters of Wind and Solar Generating Stations)
that “inter-state wheeling transactions of Wind and Solar Generating stations as State Entities, for balancing of
deemed renewable purchase obligation (RPO) compliance of buyers with respect to schedule, deviations by
all wind and solar generators which are state entities shall first be netted off for the entire pool on a monthly
basis and any remaining shortfall in renewable energy generation must be balanced through purchase of
equivalent solar and non-solar Renewable Energy Certificates (RECs ), as the case may be, by SLDC or
agency maintaining the pool account by utilizing funds from the Pool Account. For positive balance of
renewable energy generation, equivalent notional RECs shall be credited to the DSM Pool and carried forward
for settlement in future”.
ITEM NO. 9: SCADA and E&T RELATED ISSUES 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS &
132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR
HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS:- SLDC informed that the telemetry
integration of all the substations of MPPTCL planned to be integrated at SLDC has been successfully
completed.
SLDC further informed that telemetry of Birsinghpur HPS and Zinna HPS is not available and same
needs to be provided by MPPGCL. MPPGCL informed that telemetry integration of Birsinghpur HPS and Zinna
HPS will be completed by 1st March. In response SLDC, MPPTCL requested to expedite the commissioning
and arrange commissioning of telemetry on priority basis. SLDC also informed to MPPGCL that since
commissioning of all other HPS telemetry is completed, the commissioning of telemetry of Zinna and
Birsingpur may be taken up immediately and arrange to be completed by January end. Further, SLDC
requested MPPGCL to arrange for planning & testing of communication links before commissioning of
telemetry.
9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS:- SLDC informed that in substations having
DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This
results in wrong Bus Voltage in case of outage of transformer.
Minutes of 76th OCCM of MP 24
SLDC informed that extension of Bus Voltage through separate MFM is still pending for 400 KV
Badnawar, 400 KV Chhegaon, 400 KV Kirnapur, 400 Katni & 400 KV Pithampur.. MPPTCL informed that
earlier the issue was observed only at 400 KV S/s Badnawar as the panel commissioning work was not
completed & the telemetry of 400 KV Bus would also be available even during the outage in transformer
through which the telemetry has been extended. SLDC thus requested MPPTCL to arrange for testing of the
same in any one substation of MPPTCL. MPPTCL informed that they will arrange for testing in 400 KV
Badnawar S/s.
9.3 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED
VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS:- SLDC informed
that various telemetry discrepancies are pertaining to MPPTCL & MPPGCL are pending since long time & are
detailed below:-
(a) MPPGCL Generating Substations :-
1. Satpura TPS :-
2. SGTPS :-
3. Gandhi Sagar HPS :- Restoration of the telemetry of Gandhi Sager HPS through wideband
equipment: - SLDC informed that RTU replacement work at Gandhisagar HPS has been completed in the
Sr.No. Description Unit Pending
since
MPPGCL
response in
meeting
dtd.30.10.18
MPPGCL response in 75th OCCM
1 400 KV Satpura -
Itarsi
MW 10 months - SLDC informed that in last OCCM
meeting, it was informed by MPPGCL that
new transducer of higher accuracy class
i.e. 0.2 S are being purchased to rectify the
issues, however no progress in the matter
has been observed and the issues still
persist. SLDC requested MPPGCL to take
up the matter on highest priority. MPPGCL
informed that they will arrange for the
same at the earliest.
2 400 KV Satpura-
Koradi
MW 10 months -
3 400 KV Satpura-
Seoni
MW 10 months -
Sr.No. Description Unit Pending
since
MPPGCL response in meeting
dtd.30.10.18
MPPGCL response in
76th OCC
1 220/33 KV
Transformer
MW/MVA
R
More than
one year
MPPGCL informed that it shall be
provided within one month.
MPPGCL informed that it
will be rectified at the
earliest.
Minutes of 76th OCCM of MP 25
month of November 2020. However, CB of Gen No 5 and MW, MVAR of 33 KV feeder Kuakheda and
Bhanpura has still not been provided. MPPGCL informed that the cabling work is pending to be completed
& will be completed at the earliest.
(b) Transmission/ other Generating Substations :-
Sl
No. Name of Substation Name of feeders/transformers
01 400 ISP
SLDC informed that following issues pertaining to ISP
are pending to be completed :-
(i) Isolator of Transfer bus is still not available –
ISP informed that issue will be resolved at
the earliest.
(ii) MW of 400 KV Indore feeder 1 is showing
wrong value.- ISP informed that the issue will
be resolved after replacement of transducers
with higher accuracy class (0.2 S).
(iii) (iii) Telemetry of power plant is not updating
properly/update with time delay. The
Generation values stops updating properly and
while non updation, no non update tag is
appeared some time- ISP informed that issue
will be resolved at the earliest.
02 400 KV Julwaniya CB status of 132/33 KV Xmer is showing open.
This problem is persisting since last 8 months. No
action in the matter has been taken.
03 220 KV Nimrani Telemetry of 33 KV Maral is to be provided
04 220 KV Ratlam 220 KV TBC CB faulty
MPPTCL informed that telemetry discrepancies pertaining to MPPTCL S/s will be resolved at the
earliest.
9.4 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that
extension of RGMO/FGMO signal of following generating units is still pending:-
S.No. Name of Generating
Station
Unit.No. MPPGCL response in last OCC
Minutes of 76th OCCM of MP 26
1 SGTPS 1,2,3,4 SLDC informed that it was intimated by MPPGCL in
last three OCC meetings that integration work of
RGMO/FGMO signal is under tendering process &
telemetry integration of RGMO/FGMO signal shall be
completed within 3-4 months. However no progress in
the matter has been observed even after lapse of 1
year period. MPPGCL informed that it will be
completed at the earliest.
2 BARGI HPS 2 SLDC informed that integration of RGMO/FGMO
signal at Bargi HPS shall be done during AOH of units
in 2019. However no progress in the matter has been
observed. MPPGCL informed that the integration of
RGMO/FGMO signal will be done during the next
planned outage in unit within 25 days.
3. Singha ji Phase 2 3, 4 MPPGCL informed that matter has been taken up
with L&T to initiate the work at the earliest & the
integration work will be done when the units will be
taken on operation.
9.5 REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:- SLDC informed that
the RTUs installed at Thermal & Hydel power stations for providing real time data to SLDC has completed
their life and giving problems in expansion of telemetry & maintence of RTUs. As, replacement of RTUs
required sufficient time, the matter of replacement of RTUs at power stations was taken up by SLDC since
2018. The replacement of RTUs of hydel power stations is under progress. However, no progress regarding
replacement of RTUs of thermal power stations is observed.
The matter was taken up by SLDC in various OCCM meetings as well as in separate SCADA and
communication meetings held with power station officers. However, no progress is observed. In response it
was informed by MPPGCL representative that in place of arranging replacement of RTUs, MPPGCL is
exploring the possibility of integrating the telemetry of thermal Power Stations through existing SCADA system
at Power stations. SLDC enquired regarding availability of IEC 60870-5-101 gateway in SCADA and protocol
compatibility with SLDC.As no information is provided by MPPGCL, SLDC suggested MPPTCL to immediately
arrange testing for compatibility of SLDC SCAAD system with power station SCADA. MPPGCL informed that
they will arrange for the same within a month.
9.6 NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC
TO THERMAL/ HYDEL POWER STATIONS:- It is to inform that as per CERC communication
Minutes of 76th OCCM of MP 27
regulation 2017, availability of communication channel is required to be ensured more than 99.9%. However,
despite constant pursuance, presently most of the PLCC voice communication of various power stations to
SLDC is out since long time and detailed of non-availability as here under: -
Sr.No Name of
HPS/TPS
2 wire PLCC
channel
MPPGCL response in meeting
dtd.30.10.18
Remark
1.
Bansagar- IV
PLCC voice
communication is not
established
AE, Tons HPS informed that he will
visit Bansagar-IV for restoration of
voice communication of Bansagar-IV
at the earliest.
Restoration of PLCC
channel is still
pending.
2.
Madikheda
PLCC voice channel
is not working since
long time.
Restoration of PLCC
channel is still pending
.
3
Birsinghpur HPS
/TPS
PLCC voice channel
is not working since
long time due to faulty
PLCC exchange at
Birsinghpur.
AE Birsinghpur informed that
presently voice communication
between SLDC to thermal power
house is proper & the commissioning
of EPAX at site is under progress. AE
Birsinghpur assured that the voice
channel of Birsinghpur HPS shall be
restored within one month.
In last meeting it was
informed that the
restoration completed
by a month. However
restoration of voice
channel of Birsinghpur
HPS is still pending.
The matter regarding Non Availability/ Unreliable voice communication Between SLDC to Thermal/
Hydel Power Stations was discussed in various OCC meeting however 2 wire voice facility extension of
Singhaji 1 & 2 TPS, Madikheda HPS, is still pending.
9.7 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA:-
SLDC informed that out of 175 RTUs, SOE verification of 171 RTUs has been completed & SOE verification of
4 Sub – station i.e 400 KV Astha ,220 KV Gudgoan and 132 KV Khirkiya and Harda is still pending. MPPTCL
informed that SOE verification work of balance S/s will be completed at the earliest.
9.8 RECTIFICATION OF OPGW LINK BETWEEN 220 KV S/S SATNA –KATNI AND
400 KV BHOPAL -220 KV BHOPAL:- SLDC informed that Presently one link between 220 KV S/s
Satna –Katni is in working condition as Out of 8 fibre 3 fibre is in healthy condition hence only one link is
working and restoration of alternate/secondary link is still pending.
Minutes of 76th OCCM of MP 28
Further in 400 KV -220 KV Bhopal OPGW Link out of 24 Fiber 18 Fiber are found faulty. The
restoration of this fiber is requested. Hence both the link between 400 KV Bhopal -220 KV Bhopal are not in
working condition. As no representative from EHT was present, the matter could not be discussed.
9.9 TELEMETRY OF RAILWAY TSS SUB STATIONS :- The telemetry of existing 38 Nos
Railway Traction Sub Stations & upcoming 25 new Railways TSS is required to be provided by railway for
monitoring of drawl by each TSS and also monitoring of demand of railway in MP. Hence telemetry of 25 Nos
Railway Traction Sub Stations out of 63 has been commissioned and are reporting to SLDC, Jabalpur .
However telemetry availability of Railway TSS are very poor. Please provide the status of remaining 38 Nos
Railway Traction Sub Stations as well as ensure reliable telemetry of existing Railway TSS. As No
representatives from Railways were present in the meeting, the matter could not be discussed.
ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING:- It is proposed to hold 77th
Operation and Coordination Committee meeting of MP in 1st week of MARCH.
***********
Minutes of 76th OCCM of MP 29
Annexure-2.1
S. No. Particulars
1
1.1 Maximum Frequency 50.09 HzBetween 10.00 hrs & 11.00 Hrs on 13.09.20
50.11 HzBetween 09.00 hrs & 10.00 Hrs on 02.10.20
50.08 HzBetween 18.00 hrs & 19.00 Hrs on 14.11.20
1.2 Minimum Frequency 49.79 HzBetween 18.00 hrs & 19.00 Hrs on 19.09.20
49.81 HzBetween 07.00 hrs & 08.00 Hrs on 13.07.20
49.84 HzBetween 17.00 hrs & 18.00 Hrs on 05.11.20
1.3 Average Frequency 50 Hz 50 Hz 49.84 Hz
2
2.1 Maximum Frequency 50.2 HzAT 06.02.40 HRS ON 26.09.20
50.27 HzAT 10.05:20 HRS ON 12.10.20
50.27 HzAT 00.04:30 HRS ON 16.11.20
2.2 Minimum Frequency 49.64 HzAT 18:50:40 HRS ON 24.09.20
49.7 HzAT 18:14:20. HRS ON 28.10.20
49.68 HzAT 17:20:00. HRS ON 05.11.20
3 Percentage of time when frequency was :-
%age of time when frequency was Sep-20 Oct-20 Nov-20
3.1 Below 48.5 Hz 0.00 0 0
3.2 Between 48.50 Hz and 48.8 Hz 0.00 0 0
3.3 Between 48.80 Hz and 49.2 Hz 0.00 0 0
3.4 Between 49.20 Hz and 49.5 Hz 0.00 0 0
3.5 Between 49.50 Hz and 49.7 Hz 0.00 0 0
3.6 Between 49.70 Hz and 49.9 Hz 4.23 3.91 4.53
3.7 Between 49.9 Hz and 50.05 Hz 84.23 81.87 79.82
3.8 Between 50.05 Hz AND 51.5 Hz 11.54 14.21 15.65
3.9 Above 51.5 Hz 0.00 0.00 0.00
4 No. of times frquency touched 48.80 Hz 0 0 0
4.1 No. of times frquency touched 48.60 Hz 0 0 0
4.2 No. of times frquency touched 51.0 Hz 0 0 0
FREQUENCY PARTICULARS
INTEGRATED OVER AN-HOUR
INSTANTANEOUS FREQUENCY
Sep-20 Oct-20 Nov-20
Minutes of 76th OCCM of MP 30
Annexure-3.2.2
Sr No
KV TIME DATE KV TIME DATE
1 414 2.00 1 Sep 20 401 10.00 9 Sep 20
2 416 4.00 24 Sep 20 400 10.40 5 Sep 20
3 418 2.00 1 Sep 20 405 11.00 2 Sep 20
4 426 2.00 1 Sep 20 410 10.00 9 Sep 20
5 423 3.00 3 Sep 20 405 2.00 29 Sep 20
6 415 4.00 24 Sep 20 397 10.20 9 Sep 20
7 418 4.00 20 Sep 20 404 11.00 2 Sep 20
8 423 2.00 1 Sep 20 407 10.00 9 Sep 20
9 424 20.00 20 Sep 20 406 9.00 2 Sep 20
10 435 18.00 20 Sep 20 419 19.00 24 Sep 20
11 423 2.00 21 Sep 20 409 10.00 9 Sep 20
12 3.30 4 Jun 20 15.30 25 Jun 20
13 18.00 10 Jun 20 7.00 22 Jun 20
14 18.00 14 Jun 20 13.53 1 Jun 20
15 18.03 19 Jun 20 13.53 1 Jun 20
16 18.00 11 Jun 20 11.00 9 Jun 20
17 18.00 14 Jun 20 23.00 2 Jun 20
18 18.00 14 Jun 20 21.00 8 Jun 20
Sep-20M A X I M U M M I N I M U M
Indore
Bhopal
Nagda
Isp
Katni
Sagar
Satpura
SGTPS Birsinghpur
Bina
Pithampur
Ashta
Julwania
Kirnapur
Badnawar
Name of Sub Station
Singaji
chhegaon
Itarsi
Gwalior
Minutes of 76th OCCM of MP 31
Sr No
KV TIME DATE KV TIME DATE
1 417 21.00 24 Oct 20 398 15.00 13 Oct 20
2 419 20.15 31 Oct 20 396 10.25 10 Oct 20
3 420 20.00 30 Oct 20 399 16.00 17 Oct 20
4 425 4.00 2 Oct 20 407 16.00 27 Oct 20
5 420 6.00 7 Oct 20 405 11.00 10 Oct 20
6 418 20.00 31 Oct 20 392 10.25 10 Oct 20
7 421 20.00 25 Oct 20 402 11.00 10 Oct 20
8 423 21.00 24 Oct 20 399 16.00 27 Oct 20
9 425 20.00 2 Oct 20 402 11.00 10 Oct 20
10 435 22.00 31 Oct 20 419 11.00 10 Oct 20
11 424 21.00 24 Oct 20 405 15.00 17 Oct 20
12 0.30 30 Aug 20 9.30 28 Aug 20
13 18.00 3 Aug 20 9.00 24 Aug 20
14 5.00 29 Aug 20 11.32 5 Aug 20
15 6.02 26 Aug 20 11.32 5 Aug 20
16 4.00 14 Aug 20 12.00 17 Aug 20
17 5.00 29 Aug 20 23.00 1 Aug 2018 18.00 3 Aug 20 21.00 17 Aug 20
Isp
KatniSagar
Kirnapur
Badnawar
Singaji
chhegaon
Itarsi
Gwalior
M I N I M U M
Indore
Bhopal
Nagda
Satpura
Name of Sub Station
SGTPS Birsinghpur
Bina
Pithampur
Oct-20
M A X I M U M
Ashta
Julwania
Minutes of 76th OCCM of MP 32
Sr NoKV TIME DATE KV TIME DATE
1 419 7.00 15 Nov 20 397 10.00 23 Nov 20
2 423 2.00 26 Nov 20 396 9.15 2 Nov 20
3 424 20.00 19 Nov 20 399 9.00 25 Nov 20
4 426 21.00 15 Nov 20 404 9.00 17 Nov 20
5 424 2.00 26 Nov 20 400 11.00 23 Nov 20
6 419 2.00 26 Nov 20 392 8.40 6 Nov 20
7 422 21.00 28 Nov 20 401 10.00 23 Nov 20
8 427 21.00 15 Nov 20 398 9.00 30 Nov 20
9 425 20.00 1 Nov 20 403 9.00 23 Nov 20
10 436 22.00 11 Nov 20 415 10.00 28 Nov 20
11 426 20.00 2 Nov 20 403 9.00 25 Nov 20
12 3.30 9 Jul 20 14.30 1 Jul 20
13 4.00 2 Jul 20 15.00 1 Jul 20
14 3.28 2 Jul 20 13.11 4 Jul 20
15 2.18 5 Jul 20 13.11 4 Jul 20
16 3.00 6 Jul 20 10.00 27 Jul 20
17 18.00 7 Jul 20 15.00 27 Jul 20
18 5.00 12 Jul 20 11.00 27 Jul 20
M I N I M U M Nov-20
Name of Sub Station M A X I M U M
Indore
Bhopal
Nagda
Satpura
SGTPS Birsinghpur
Bina
Julwania
Kirnapur
Badnawar
Sagar
Singaji
chhegaon
Itarsi
Gwalior
Isp
Katni
Pithampur
Ashta
Minutes of 76th OCCM of MP 33
Annexure‐.2.2.4
Sl.No. Circle Capacitor Banks planned for 2020‐21 Remark
1 Jabalpur
1x12 MVAr at 132KV S/S Shahpura Patan, Vinoba Bhave, Gadarwara, Karapgaon, Mandla &
Chichli 220, 2x12MVAr at 220KV S/S Narsinghpur & Shrinagar , Aug of 5MVAr bank with
12MVAR at Narsinghpur 132
‐
2 Seoni 2x12MVAr at 132KV S/S Waraseoni ‐
3 Satna1x12 MVAr bank at 132KV S/S Deosar, 1x12MVAr at 220KV S/S Anooppur, Birsinghpur &
132KV S/S Dongarital & Satna ‐
4 Sagar 1x12 MVAr bank at 132KV S/S Hatta & 220KV S/s Tikamgarh ‐
5 Bina
2x12MVAR at 220KV S/S Ashoknagar & 132KV S/S Raghogarh Bhonra, Existing 5MVAr to be
upgraded by 12MVAr at 220KV S/S Guna, 132KV S/S Aron , Addl 1x12MVAr bank at 132KV
S/S Ishagarh
‐
6 Bhopal 1x12 MVAr bank at 132KV S/S Bilquisganj, IT Park Badwai & Pilukhedi ‐
7 Gwalior
Mehgaon 220 *(2x5MVAr by 2x12MVAr), Bhind 132*(2x5MVAr by 2x12MVAr) , Seondha
132*(2x5MVAr by 2x12MVAr), Dabra 132* (2x6MVAr by 2x12MVAr), Ambah 132*(2x5MVAr
by 12MVAr), 1x12MVAr at Kolaras 132 , Karera 132 , Baroda 132 , Pichhor132 & Shivpuri 220
*Augmentation of old bank
8 Khandwa
1x12MVAR banks at Badgaon, Bhikangaon, Pandhana, sanawad, kasrawad,Balwada, Andad,
Talaqpura,Dhamnod, Sendhwa 132, Julwania & Nimrani 220 and 2x12MVAr at Bahadarpur &
, 2x33MVAr at 400KV S/S Chhegaon & 1x33MVAr at 220KV S/S Nepanagar. Aug work of C
Bank at C.Khargon & Pansemal 132
‐
9 Ujjain
2x12MVAR at 220KV S/S Ujjain, Dewas & Badnagar , 1x12MVAr at 132KV S/S Bherugarh,
Zarda, Tarana,Ujjain, Khategaon, Arniyakalan, Polaikalan & Panwadi & 6MVAR at Badnagar
220
‐
10 Indore1x12MVAr at 132KV S/S Rajgarh Dhar( 5to12), Petlawad , Meghnagar, Depalpur132, Rau
132, Simrol 132, Rajgarh 220 & Alirajpur 132(12 to 24) ‐
11 Nagda2x5 to 1x12MVAR at Ratlam 220, 2x5 to 2x12MVAR at Ratlam 132, 1x5 to 1x12MVAr at Suwasra 132 &
Mandsour 132, 1x12MVAr at 132KV S/S Tal,Manasa , Neemuch & Bhanpura220, 2x12MVAr at
Nagda220 & Khachrod 132
‐
Plan for installation of Capacitor Banks in 2020‐21
Minutes of 76th OCCM of MP 34
Annexure-2.3(i)
Sep-20 Oct-20 Nov-20 Sep-20 Oct-20 Nov-20
Commissinary HQ 23:53 23:50 23:56 23:50 23:50 23:47
District HQ 23:49 23:49 23:54 23:53 23:52 23:52
Tehsil HQ 23:39 23:42 23:46 23:43 23:45 23:46
Rural -Mixed 23:18 23:20 23:30 23:37 23:35 23:38
Rural -DLF 23:17 23:19 23:30 23:31 23:35 23:38
Rural -Irrigation 9:44 9:47 9:48 9:55 9:54 9:55
Sep-20 Oct-20 Nov-20 Sep-20 Oct-20 Nov-20
Commissinary HQ 23:54 23:55 23:56 23:52 23:51 23:53
District HQ 23:50 23:52 23:55 23:50 23:51 23:54
Tehsil HQ 23:47 23:49 23:53 23:43 23:45 23:48
Rural -3Phase 23:34 23:25 23:35 23:26 23:26 23:33
Rural -1Phase 23:40 23:41 23:47 23:28 23:31 23:37
Total Rural 9:46 9:50 9:53 9:48 9:50 9:52
Discoms wise Average Supply Hours
PARTICULARS
PARTICULARS
West Zone MP
East Zone Central Zone
Minutes of 76th OCCM of MP 35
Annexure-2.3.ii
LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)
JABALPUR REGION
Name of EHV Substation
Name of 33KV feeder
Date of commission-ing of feeder
bay
Date of commission
-ing of feeder
220KV
220 KV Seoni 33 KV Karirat 21.08.2007 06.01.2016
132KV
132 KV Ponder 33 KV NSPL 19.01.2018 19.01.2018
132 KV Palohabada
33 KV Bilthari 33 KV Sadumar
01.04.2019 02.04.2019
01.04.2019 02.04.2019
132 KV Narsinghpur
33 KV Nagar Palika 28.02.2018
02.11.2018
132 KV Karapgaon
33 KV Karapgaon 33 KV Bansadehi 33 KV Kareli 33 KV Aamgaon
29.12.2017 29.12.2017 29.12.2017 29.12.2017
24.02.2018 27.01.2018 27.01.2018 28.01.2018
132 KV Nainpur 33 KV Keolari-II 22.01.2018 28.03.2018
132 KV Saori
33 KV Saori 33 KV Lawaghogri 33 KV Mujawar 33 KV Bhutai
05.10.2018 05.10.2018 06.11.2018 06.11.2018
12.11.2018 13.11.2018 12.11.2018 30.01.2019
LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE
(For which group to be allocated) INDORE REGION
UJJAIN REGION
Name of EHV Substation
Name of 33KV feeder Date of commissioning of feeder bay
Date of commissioning
of feeder
220KV 220KV Pithampur (Sec-III)
33KV SRF 03.09.2013 03.09.2013
132KV
132KV Chandrawatiganj
33KV Chandrawatiganj
27.04.2015
27.04.2015
132KV Electronic
33KV AKVN (Namkeen Cluster)
31.03.2016
31.03.2016
132KV Raukhedi
33KV DLF-I 33KV DLF-II
03.01.2014 03.01.2014
15.09.2018 15.09.2018
Name of EHV Substation
Name of 33KV feeder Date of commissioning of feeder bay
Date of Charging of feeder
220KV 220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018
132KV
132KV Agar
33KV Agar Town-II
03.12.2012
24.05.2018
132KV Arniyakalan
33KV Designco Manufacture & Exporter (5MW Solar Power Plant)
01.05.2018
01.05.2018
132KV Agrod
33KV Madhopur 30.06.2018 26.07.2018
Minutes of 76th OCCM of MP 36
LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)
BHOPAL REGION
Name of EHV Substation
Name of 33KV feeder
Date of charging of feeder bay
Date of charging of feeder
220 KV 220 KV Pipariya 33 KV Food Park (AKVN)
19.06.2017 25.06.2017
132 KV
132 KV Tamot 33 KV Obedullaganj 33 KV AKVN-1 33 KV AKVN-2
05.05.2016 05.10.2016 05.10.2016
02.02.2017 05.10.2016 05.10.2016
132 KV Lateri 33 KV Anantpura
15.06.2017 22.05.2018
132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda
04.12.2017 04.12.2014
04.12.2017 04.12.2017
132 KV Udaipura 33 KV Thaladigawan 33 KV Boras 33 KV Udaipura
26.04.2018 04.06.2018 04.06.2018
04.06.2018 06.06.2018 07.01.2019
132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018
132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018
132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018
Minutes of 76th OCCM of MP 37
ANNEXURE-3.2
Date Time Date Time
1 400 315MVA X-mer-IV at 400KV S/S Nagda 22-Feb-21 08:00 23-Feb-21 17:00 Continue For maintenance and testing work.
2 400 315MVA -I Xmer at 400KV S/S Sagar 02-Feb-21 09:00 02-Feb-21 18:00 Daily For maintenance and testing work.3 400 315MVA -I Xmer at 400KV S/S Sagar 03-Feb-21 09:00 03-Feb-21 18:00 Daily For maintenance and testing work.
4 400 315MVA -II Xmer at 400KV S/S Sagar 05-Feb-21 09:00 05-Feb-21 18:00 Daily For maintenance and testing work.
5 400 315MVA -II Xmer at 400KV S/S Sagar 06-Feb-21 09:00 06-Feb-21 18:00 Daily For maintenance and testing work.
6 400 315MVA Transformer No.-01 at 400KV S/S Bhopal
16-Feb-21 09:00 16-Feb-21 22:00 Daily For maintenance and testing work.
7 400 315MVA Transformer No.-01 at 400KV S/S Bhopal
17-Feb-21 09:00 17-Feb-21 22:00 Daily For maintenance and testing work.
8 400 315MVA Transformer No.-03 at 400KV S/S Bhopal
22-Feb-21 09:00 22-Feb-21 22:00 Daily For maintenance and testing work.
9 400 315MVA Transformer No.-03 at 400KV S/S Bhopal
23-Feb-21 09:00 23-Feb-21 22:00 Daily For maintenance and testing work.
10 400 315MVA Transformer No.-04 at 400KV S/S Bhopal
25-Feb-21 09:00 25-Feb-21 22:00 Daily For maintenance and testing work.
11 400 315MVA Transformer No.-04 at 400KV S/S Bhopal
26-Feb-21 09:00 26-Feb-21 22:00 Daily For maintenance and testing work.
12 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha
04-Jan-21 08:00 05-Jan-21 18:00 Continue For maintenance and testing work.
13 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha
13-Jan-21 08:00 14-Jan-21 18:00 Continue For maintenance and testing work.
14 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha
02-Feb-21 08:00 03-Feb-21 18:00 Continue For maintenance and testing work.
15 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha
08-Feb-21 08:00 09-Feb-21 18:00 Continue For maintenance and testing work.
16 400 315MVA 220KV Side ICT-I at 220KV S/S Sukha
02-Mar-21 08:00 03-Mar-21 18:00 Continue For maintenance and testing work.
17 400 315MVA 220KV Side ICT-II at 220KV S/S Sukha
09-Mar-21 08:00 10-Mar-21 18:00 Continue For maintenance and testing work.
18 400 100MVA BHEL-I Xmer at 400KV Kirnapur 12-Mar-21 09:00 13-Mar-21 17:00 Continue For pre monsoon maintenance work
19 400 100MVA BHEL-II Xmer at 400KV Kirnapur
17-Mar-21 09:00 18-Mar-21 17:00 Continue For pre monsoon maintenance work
20 400 315MVA X-mer-I at 400kV S/s Chhegaon 15-Feb-21 10:00 16-Feb-21 18:00 Continue For pre monsoon maintenance work
5. PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD 01.01.21 TO 31.03.21
Sr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
A- 400 KV TRANSFORMERS
Minutes of 76th OCCM of MP 38
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
21 400 315MVA X-mer-II at 400kV S/s Chhegaon
18-Feb-21 10:00 19-Feb-21 18:00 Continue For pre monsoon maintenance work
22 400 315MVA X-mer -I at 400kV S/s Julwaniya 23-Feb-21 09:00 23-Feb-21 17:00 Daily For pre monsoon maintenance work
23 400 315MVA X-mer -I at 400kV S/s Julwaniya 24-Feb-21 09:00 24-Feb-21 17:00 Daily For pre monsoon maintenance work
24 400 315MVA X-mer -II at 400kV S/s Julwaniya
26-Feb-21 09:00 26-Feb-21 17:00 Daily For pre monsoon maintenance work
25 400 315MVA X-mer -II at 400kV S/s Julwaniya
27-Feb-21 09:00 27-Feb-21 17:00 Daily For pre monsoon maintenance work
26 400 315MVA ICT-I at 400KV S/s Indore 15-Feb-21 09:00 15-Feb-21 18:00 Daily For pre monsoon maintenance work27 400 315MVA ICT-I at 400KV S/s Indore 16-Feb-21 09:00 16-Feb-21 18:00 Daily For pre monsoon maintenance work28 400 315MVA ICT- II at 400KV S/s Indore 17-Feb-21 09:00 17-Feb-21 18:00 Daily For pre monsoon maintenance work29 400 315MVA ICT- II at 400KV S/s Indore 18-Feb-21 09:00 18-Feb-21 18:00 Daily For pre monsoon maintenance work30 400 315MVA ICT- III at 400KV S/s Indore 19-Feb-21 09:00 19-Feb-21 18:00 Daily For pre monsoon maintenance work31 400 315MVA ICT- III at 400KV S/s Indore 20-Feb-21 09:00 20-Feb-21 18:00 Daily For pre monsoon maintenance work32 400 315MVA ICT- IV at 400KV S/s Indore 22-Feb-21 09:00 22-Feb-21 18:00 Daily For pre monsoon maintenance work33 400 315MVA ICT- IV at 400KV S/s Indore 23-Feb-21 09:00 23-Feb-21 18:00 Daily For pre monsoon maintenance work
34 400 315MVA ICT-I at 400KV S/s Pithampur 15-Mar-21 08:00 16-Mar-21 17:00 Continue For pre monsoon maintenance work
35 400 315MVA ICT-II at 400KV S/s Pithampur 18-Mar-21 08:00 19-Mar-21 17:00 Continue For pre monsoon maintenance work
1 400 125Mvar Reactor at 400KV S/S Sagar 25-Mar-21 09:00 25-Mar-21 18:00 Daily For maintenance and testing work.
2 400 50MVAr Bus-reactor (At 400kV S/s Julwaniya)
08-Mar-21 09:00 08-Mar-21 17:00 Daily For pre monsoon maintenance work
3 400 400KV ISP-II 50MVAR Reactor at 400KV S/s Indore
24-Feb-21 09:00 24-Feb-21 18:00 Daily For pre monsoon maintenance work
4 400 400KV ISP-II 50MVAR Reactor at 400KV S/s Indore
25-Feb-21 09:00 25-Feb-21 18:00 Daily For pre monsoon maintenance work
5 400 2X50 MVAR Bus Reactor at 400KV S/s Pithampur
19-Mar-21 08:00 19-Mar-21 17:00 Daily For pre monsoon maintenance work
6 400 125MVAR Line Reactor (SSTPH-IV) at 400KV S/s Pithampur
20-Mar-21 08:00 20-Mar-21 17:00 Daily For pre monsoon maintenance work
7 400 125MVAR Line Reactor (SSTPH-III) at 400KV S/s Pithampur
22-Mar-21 08:00 22-Mar-21 17:00 Daily For pre monsoon maintenance work
8 400 400KV Pithampur-PGCIL-I 02-Mar-21 08:00 02-Mar-21 17:00 Daily For maintenance and testing work.9 400 400KV Pithampur-PGCIL-II 03-Mar-21 08:00 03-Mar-21 17:00 Daily For maintenance and testing work.10 400 400KV Pithampur-SSTPH-II 04-Mar-21 08:00 04-Mar-21 17:00 Daily For maintenance and testing work.11 400 400KV Pithampur-SSTPH-III 05-Mar-21 08:00 05-Mar-21 17:00 Daily For maintenance and testing work.12 400 400KV Pithampur-SSTPH-IV 06-Mar-21 08:00 06-Mar-21 17:00 Daily For maintenance and testing work.
B- 400 KV REACTORS
Minutes of 76th OCCM of MP 39
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
13 400 400KV Pithampur-Badnawar-I 07-Mar-21 08:00 07-Mar-21 17:00 Daily For maintenance and testing work.14 400 400KV Pithampur-Badnawar-II 09-Mar-21 08:00 09-Mar-21 17:00 Daily For maintenance and testing work.
Minutes of 76th OCCM of MP 40
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
1 400 400KV Nagda- Indore feeder at Nagda end
05-Jan-20 08:00 05-Jan-20 18:00 Daily For maintenance and testing work.
2 400 400KV Nagda- ISP feeder at Nagda end 24-Feb-21 08:00 24-Feb-21 18:00 Daily For maintenance and testing work.
3 400 400KV Nagda-Badnawar feeder-I at Nagda end
25-Feb-21 08:00 25-Feb-21 18:00 Daily For maintenance and testing work.
4 400 400KV MPPTCL Sagar-400KV PGCIL Satna
09-Feb-21 09:00 09-Feb-21 18:00 Daily For maintenance and testing work.
5 400 400KV MPPTCL Sagar-400KV PGCIL Bina 08-Feb-21 09:00 08-Feb-21 18:00 Daily For maintenance and testing work.
6 400 400KV Bus coupler at 400KV S/S Sagar 12-Feb-21 09:00 12-Feb-21 18:00 Daily For maintenance and testing work.
7 400 400Kv Bhopal- Bina-1 Bay 18-Jan-21 09:00 18-Jan-21 22:00 Daily For maintenance and testing work.8 400 400Kv Bhopal -Bina-2 Bay 19-Jan-21 09:00 19-Jan-21 22:00 Daily For maintenance and testing work.9 400 400Kv Bhopal -Itarsi-2 Bay 09-Mar-21 09:00 09-Mar-21 22:00 Daily For maintenance and testing work.10 400 400Kv Bhopal -Itarsi-1 Bay 16-Mar-21 09:00 16-Mar-21 22:00 Daily For maintenance and testing work.11 400 400Kv Bhopal -BDTCL-01 Bay 19-Mar-21 09:00 19-Mar-21 22:00 Daily For maintenance and testing work.12 400 400Kv Bhopal -Bdtcl-2 Bay 24-Mar-21 09:00 24-Mar-21 22:00 Daily For maintenance and testing work.13 400 400KV Kirnapur -Seoni PGCIL 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.14 400 400KV Kirnapur -Bhilai 22-Jan-21 09:00 22-Jan-21 17:00 Daily For maintenance and testing work.15 400 400KV Kirnapur -Seoni PGCIL 03-Mar-21 09:00 03-Mar-21 17:00 Daily For pre monsoon maintenance work16 400 400KV Kirnapur -Bhilai 05-Mar-21 09:00 05-Mar-21 17:00 Daily For pre monsoon maintenance work
17 400 400KV Chhegaon-Malwa at 400kV S/s Chhegaon
22-Feb-21 10:00 22-Feb-21 18:00 Daily For pre monsoon maintenance work
18 400 400KV Chhegaon-Julwaniya at 400kV S/s Chhegaon
24-Feb-21 10:00 24-Feb-21 18:00 Daily For pre monsoon maintenance work
19 400 400KV Julwania-SSTPS ta 400kV S/s Julwaniya
10-Mar-21 09:00 10-Mar-21 17:00 Daily For pre monsoon maintenance work
20 400 400KV Julwania-Chhegoan at 400kV S/s Julwaniya
12-Mar-21 09:00 12-Mar-21 17:00 Daily For pre monsoon maintenance work
21 400 400KV TBC Bay at 400kV S/s Julwaniya 15-Mar-21 09:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work
1 400 440KV Badnawar-Pithampur-I at 400KV S/S Badnawar
07-Feb-21 10:00 07-Feb-21 17:00 Daily For pre monsoon maintenance work
2 400 440KV Badnawar-Pithampur-II at 400KV S/S Badnawar
03-Mar-21 10:10 03-Mar-21 17:00 Daily For pre monsoon maintenance work
1 400 400KV Indore-ISP-I 26-Feb-21 09:00 26-Feb-21 18:00 Daily For pre monsoon maintenance work2 400 400KV Indore-ISP-II 27-Feb-21 09:00 27-Feb-21 18:00 Daily For pre monsoon maintenance work
3 400 400KV Bus Transfer at 400KV S/s Indore 04-Jan-21 09:00 04-Jan-21 18:00 Daily For pre monsoon maintenance work
4 400 400KV Indore-Nagda 02-Mar-21 09:00 02-Mar-21 18:00 Daily For pre monsoon maintenance work
C- 400 KV FEEDER & BAYS
Minutes of 76th OCCM of MP 41
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
5 400 400KV TBC at 400KV S/s Indore 03-Mar-21 09:00 03-Mar-21 18:00 Daily For pre monsoon maintenance work
6 400 400KV Bus Coupler at 400KV S/s Indore 04-Mar-21 09:00 04-Mar-21 18:00 Daily For pre monsoon maintenance work
1 220 160MVA X-mer-I At 220KV s/s Mehgaon 04-Jan-21 09:00 04-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
2 220 160MVA X-mer-II At 220KV s/s Mehgaon 04-Jan-21 09:00 04-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
3 220 160MVA X-mer-I At 220KV s/s Mehgaon 05-Jan-21 09:00 05-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
4 220 160MVA X-mer-II At 220KV s/s Mehgaon 05-Jan-21 09:00 05-Jan-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
5 220 160MVA X-Mer-I at 220KV S/S Datia 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.6 220 160MVA X-Mer-II at 220KV S/S Datia 19-Jan-21 09:00 19-Jan-21 17:00 Daily For maintenance and testing work.
7 220 160MVA X-mer-I At 220KV s/s Mehgaon 08-Feb-21 09:00 08-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
8 220 160MVA X-mer-II At 220KV s/s Mehgaon 08-Feb-21 09:00 08-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
9 220 160MVA X-mer-I At 220KV s/s Mehgaon 09-Feb-21 09:00 09-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
10 220 160MVA X-mer-II At 220KV s/s Mehgaon 09-Feb-21 09:00 09-Feb-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
11 220 160MVA X-Mer-I at 220KV S/S Datia 22-Feb-21 09:00 22-Feb-21 17:00 Daily For maintenance and testing work.12 220 160MVA X-Mer-II at 220KV S/S Datia 23-Feb-21 09:00 23-Feb-21 17:00 Daily For maintenance and testing work.
13 220 160MVA X-mer-I At 220KV s/s Mehgaon 04-Mar-21 09:00 04-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
14 220 160MVA X-mer-II At 220KV s/s Mehgaon 04-Mar-21 09:00 04-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
15 220 160MVA X-mer-I At 220KV s/s Mehgaon 05-Mar-21 09:00 05-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
D- 220 KV TRANSFORMERS
Minutes of 76th OCCM of MP 42
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
16 220 160MVA X-mer-II At 220KV s/s Mehgaon 05-Mar-21 09:00 05-Mar-21 17:00 Daily220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
17 220 160MVA X-Mer-I at 220KV S/S Datia 22-Mar-21 09:00 22-Mar-21 17:00 Daily For maintenance and testing work.18 220 160MVA X-Mer-II at 220KV S/S Datia 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.19 220 160MVA-I EMCO at 220KV Shivpuri 13-Mar-21 10:00 13-Mar-21 17:00 Daily For maintenance and testing work.20 220 160MVA-II BHEL at 220KV Shivpuri 16-Mar-21 10:00 16-Mar-21 17:00 Daily For maintenance and testing work.21 220 160VA BBL-I Xmer at 220KV Sheopur 06-Mar-21 10:00 06-Mar-21 17:00 Daily For maintenance and testing work.
22 220 160MVA BBL-II Xmer at 220KV Sheopur 09-Mar-21 10:00 09-Mar-21 17:00 Daily For maintenance and testing work.
23 220 160MVA BHEL Xmer at 220KV S/S Damoh
15-Mar-21 09:00 15-Mar-21 18:00 Daily For maintenance and testing work.
24 220 160MVA AREVA Xmer at 220KV S/s Damoh
16-Mar-21 09:00 16-Mar-21 18:00 Daily For maintenance and testing work.
25 220 160MVA AREVA Xmer at 400KV S/s Sagar
18-Mar-21 09:00 18-Mar-21 18:00 Daily For maintenance and testing work.
26 220 160MVA AREVA Xmer at 400KV S/s Sagar
19-Mar-21 09:00 19-Mar-21 18:00 Daily For maintenance and testing work.
27 220 160MVA AREVA Xmer at 220KV S/s Chhindwara
15-Mar-21 10:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work
28 220 160MVA BHEL Xmer at 220KV S/s Chhindwara
18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work
29 220 160MVA CGL Xmer at 220KV S/s Pandhurna
24-Mar-21 09:00 24-Mar-21 17:00 Daily For pre monsoon maintenance work
30 220 160MVA BBL Xmer at 220KV S/s Pandhurna
27-Mar-21 10:00 27-Mar-21 17:00 Daily For pre monsoon maintenance work
31 220 160MVA BBL Xmer at 220KV S/s Seoni 15-Mar-21 09:00 15-Mar-21 17:00 Daily For pre monsoon maintenance work32 220 160MVA CGL Xmer at 220KV S/s Seoni 18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work
33 220 160MVA X-mer-I at 400KV S/s Julwania 14-Mar-21 09:00 14-Mar-21 17:00 Daily For pre monsoon maintenance work
34 220 160MVA X-mer-II at 400KV S/s Julwania 18-Mar-21 09:00 18-Mar-21 17:00 Daily For pre monsoon maintenance work
35 220 160MVA AREVA X-mer at 220kV S/s Julwaniya
28-Mar-21 09:00 28-Mar-21 17:00 Daily For pre monsoon maintenance work
1 220 220KV Malanpur-PGCIL-I CKT 04-Jan-21 09:00 04-Jan-21 17:00 Daily For maintenance and testing work.2 220 220KV Malanpur-PGCIL-II CKT 05-Jan-21 09:00 05-Jan-21 17:00 Daily For maintenance and testing work.3 220 220KV Malanpur-Adani CKT 06-Jan-21 09:00 06-Jan-21 17:00 Daily For maintenance and testing work.4 220 220KV Malanpur-Auraiya CKT 07-Jan-21 09:00 07-Jan-21 17:00 Daily For maintenance and testing work.5 220 220KV Malanpur-Morena-I CKT 11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance and testing work.6 220 220KV Malanpur-Morena-II CKT 12-Jan-21 09:00 12-Jan-21 17:00 Daily For maintenance and testing work.7 220 220KV Mahalgaon PGCIL-I Ckt 08-Jan-21 10:00 08-Jan-21 17:00 Daily For maintenance and testing work.
E- 220 KV FEEDER & BAYS-
Minutes of 76th OCCM of MP 43
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
8 220 220KV Mahalgaon PGCIL-II Ckt 09-Jan-21 10:00 09-Jan-21 17:00 Daily For maintenance and testing work.9 220 220KV Mahalgaon-Bina Ckt 15-Jan-21 10:00 15-Jan-21 17:00 Daily For maintenance and testing work.10 220 220KV Mahalgaon-Datia Ckt 16-Jan-21 10:00 16-Jan-21 17:00 Daily For maintenance and testing work.11 220 220KV Malanpur-PGCIL-I CKT 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.12 220 220KV Malanpur-PGCIL-II CKT 18-Feb-21 09:00 18-Feb-21 17:00 Daily For maintenance and testing work.13 220 220KV Malanpur-Adani CKT 06-Feb-21 09:00 06-Feb-21 17:00 Daily For maintenance and testing work.14 220 220KV Malanpur-Auraiya CKT 05-Feb-21 09:00 05-Feb-21 17:00 Daily For maintenance and testing work.15 220 220KV Malanpur-Morena-I CKT 07-Feb-21 09:00 07-Feb-21 17:00 Daily For maintenance and testing work.16 220 220KV Malanpur-Morena-II CKT 08-Feb-21 09:00 08-Feb-21 17:00 Daily For maintenance and testing work.17 220 220KV Mahalgaon PGCIL-I Ckt 09-Feb-21 10:00 09-Feb-21 17:00 Daily For maintenance and testing work.18 220 220KV Mahalgaon PGCIL-II Ckt 11-Feb-21 10:00 11-Feb-21 17:00 Daily For maintenance and testing work.19 220 220KV Mahalgaon-Bina Ckt 15-Feb-21 10:00 15-Feb-21 17:00 Daily For maintenance and testing work.20 220 220KV Mahalgaon-Datia Ckt 17-Feb-21 10:00 17-Feb-21 17:00 Daily For maintenance and testing work.21 220 220KV Gwalior II-PGCIL-I CKT 16-Mar-21 09:00 16-Mar-21 17:00 Daily For maintenance and testing work.22 220 220KV Gwalior II-PGCIL-II CKT 17-Mar-21 09:00 17-Mar-21 17:00 Daily For maintenance and testing work.23 220 220KV Malanpur-PGCIL-I CKT 22-Mar-21 09:00 22-Mar-21 17:00 Daily For maintenance and testing work.24 220 220KV Malanpur-PGCIL-II CKT 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.25 220 220KV Malanpur-Adani CKT 25-Mar-21 09:00 25-Mar-21 17:00 Daily For maintenance and testing work.26 220 220KV Malanpur-Auraiya CKT 26-Mar-21 09:00 26-Mar-21 17:00 Daily For maintenance and testing work.27 220 220KV Malanpur-Morena-I CKT 30-Mar-21 09:00 30-Mar-21 17:00 Daily For maintenance and testing work.28 220 220KV Malanpur-Morena-II CKT 31-Mar-21 09:00 31-Mar-21 17:00 Daily For maintenance and testing work.29 220 220KV Mahalgaon PGCIL-I Ckt 03-Mar-21 10:00 03-Mar-21 17:00 Daily For maintenance and testing work.30 220 220KV Mahalgaon PGCIL-II Ckt 05-Mar-21 10:00 05-Mar-21 17:00 Daily For maintenance and testing work.31 220 220KV Mahalgaon-Bina Ckt 18-Mar-21 10:00 18-Mar-21 17:00 Daily For maintenance and testing work.32 220 220KV Mahalgaon-Datia Ckt 19-Mar-21 10:00 19-Mar-21 17:00 Daily For maintenance and testing work.
33 220 220KV Mehgaon -Adani 04-Jan-21 09:00 04-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
34 220 220KV Mehgaon-Auraiya 04-Jan-21 09:00 04-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
35 220 220KV Mehgaon -Adani 05-Jan-21 09:00 05-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
36 220 220KV Mehgaon-Auraiya 05-Jan-21 09:00 05-Jan-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
37 220 220KV Datia- Bina 13-Jan-21 09:00 13-Jan-21 17:00 Daily For maintenance and testing work.38 220 220KV Datia- Gwalior 14-Jan-21 09:00 14-Jan-21 17:00 Daily For maintenance and testing work.
39 220 220KV Mehgaon -Adani 08-Feb-21 09:00 08-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
Minutes of 76th OCCM of MP 44
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
40 220 220KV Mehgaon-Auraiya 08-Feb-21 09:00 08-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
41 220 220KV Mehgaon -Adani 09-Feb-21 09:00 09-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
42 220 220KV Mehgaon-Auraiya 09-Feb-21 09:00 09-Feb-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
43 220 220KV Datia- Bina 15-Feb-21 09:00 15-Feb-21 17:00 Daily For maintenance and testing work.44 220 220KV Datia- Gwalior 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.
45 220 220KV Mehgaon -Adani 04-Mar-21 09:00 04-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
46 220 220KV Mehgaon-Auraiya 04-Mar-21 09:00 04-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
47 220 220KV Mehgaon -Adani 05-Mar-21 09:00 05-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
48 220 220KV Mehgaon-Auraiya 05-Mar-21 09:00 05-Mar-21 17:00 Daily 220KV Main Bus shutdown for fire wedge connector installation work on 220KV S/s Mehgaon
49 220 220KV Datia- Bina 15-Mar-21 09:00 15-Mar-21 17:00 Daily For maintenance and testing work.50 220 220KV Datia- Gwalior 16-Mar-21 09:00 16-Mar-21 17:00 Daily For maintenance and testing work.51 220 220KV Bus Tie at 220KV Shivpuri 11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance and testing work.52 220 220KV Shivpuri Main Bus-II 18-Jan-21 09:00 18-Jan-21 17:00 Daily For maintenance and testing work.53 220 220KV Shivpuri - Bina PGCIL 12-Feb-21 09:00 12-Feb-21 17:00 Daily For maintenance and testing work.54 220 220KV Shivpuri - Bina MPPTCL 15-Feb-21 09:00 15-Feb-21 17:00 Daily For maintenance and testing work.55 220 220KV Sheopur - Sabalgarh I 10-Mar-21 09:00 10-Mar-21 17:00 Daily For maintenance and testing work.56 220 220KV Sheopur - Sabalgarh II 12-Mar-21 09:00 12-Mar-21 17:00 Daily For maintenance and testing work.57 220 220KV Sagar-Bina I 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.58 220 220KV Sagar-Bina II 06-Jan-21 09:00 06-Jan-21 18:00 Daily For maintenance and testing work.59 220 220KV Sagar- PGCIL Damoh -I 08-Jan-21 09:00 08-Jan-21 18:00 Daily For maintenance and testing work.60 220 220KV Sagar- PGCIL Damoh -II 12-Jan-21 09:00 12-Jan-21 18:00 Daily For maintenance and testing work.61 220 220KV Sagar- PGCIL Damoh -I 16-Jan-21 09:00 16-Jan-21 18:00 Daily For maintenance and testing work.62 220 220KV Sagar- PGCIL Damoh -II 18-Jan-21 09:00 18-Jan-21 18:00 Daily For maintenance and testing work.63 220 220KV Damoh-PGCIL-I 20-Jan-21 09:00 20-Jan-21 18:00 Daily For maintenance and testing work.64 220 220KV Damoh-PGCIL-II 23-Jan-21 09:00 23-Jan-21 18:00 Daily For maintenance and testing work.65 220 220KV Sagar- PGCIL Damoh -I 11-Feb-21 09:00 11-Feb-21 18:00 Daily For maintenance and testing work.66 220 220KV Sagar- PGCIL Damoh -II 15-Feb-21 09:00 15-Feb-21 18:00 Daily For maintenance and testing work.67 220 220KV Sagar- PGCIL Damoh -II 19-Feb-21 09:00 19-Feb-21 18:00 Daily For maintenance and testing work.
Minutes of 76th OCCM of MP 45
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
68 220 220KV Vidisha-Bhopal Line 15-Mar-21 10:00 15-Mar-21 17:00 Daily For maintenance and testing work.69 220 220KV Vidisha-Bina Line 17-Mar-21 10:00 17-Mar-21 17:00 Daily For maintenance and testing work.70 220 220KV Ganjbasoda-Bhopal Line 19-Mar-21 10:00 19-Mar-21 17:00 Daily For maintenance and testing work.71 220 220KV Ganjbasoda-Bina Line 22-Mar-21 10:00 22-Mar-21 17:00 Daily For maintenance and testing work.72 220 220KV Pandhurna-Kamleshwar 19-Jan-21 10:00 19-Jan-21 17:00 Daily For maintenance and testing work.73 220 220KV Pandhurna-Betul PGCIL 12-Jan-21 09:00 12-Jan-21 17:00 Daily For maintenance and testing work.74 220 220KV Pandhurna-Kamleshwar 16-Feb-21 09:00 16-Feb-21 17:00 Daily For maintenance and testing work.75 220 220KV Pandhurna-Betul PGCIL 09-Feb-21 10:00 09-Feb-21 17:00 Daily For maintenance and testing work.76 220 220KV Pandhurna-Kamleshwar 10-Mar-21 10:00 10-Mar-21 17:00 Daily For maintenance and testing work.77 220 220KV Pandhurna-Betul PGCIL 17-Mar-21 09:00 17-Mar-21 17:00 Daily For maintenance and testing work.78 220 220KV Chhindwara-PGCIL-I 08-Mar-21 10:00 08-Mar-21 17:00 Daily For maintenance and testing work.79 220 220KV Chhindwara-PGCIL-II 09-Mar-21 10:00 09-Mar-21 17:00 Daily For maintenance and testing work.80 220 220KV Seoni-PGCIL-I 13-Jan-21 09:00 13-Jan-21 17:00 Daily For maintenance and testing work.81 220 220KV Seoni-PGCIL-II 15-Jan-21 09:00 15-Jan-21 17:00 Daily For maintenance and testing work.82 220 220KV Seoni-PGCIL-I 09-Feb-21 09:00 09-Feb-21 17:00 Daily For maintenance and testing work.83 220 220KV Seoni-PGCIL-II 12-Feb-21 09:00 12-Feb-21 17:00 Daily For maintenance and testing work.84 220 220KV Seoni-PGCIL-I 08-Mar-21 09:00 08-Mar-21 17:00 Daily For maintenance and testing work.85 220 220KV Seoni-PGCIL-II 10-Mar-21 09:00 10-Mar-21 17:00 Daily For maintenance and testing work.
86 220220KV Chhegaon-Khandwa (PGCIL)-I at 400kV S/s Chhegaon 08-Mar-21 10:00 08-Mar-21 18:00 Daily For maintenance and testing work.
87 220220KV Chhegaon-Khandwa (PGCIL)-II at 400kV S/s Chhegaon 10-Mar-21 10:00 10-Mar-21 18:00 Daily For maintenance and testing work.
88 220220KV Nepanagar-Khandwa (PGCIL) at 400kV S/s Nepanagar 12-Mar-21 10:00 12-Mar-21 18:00 Daily For maintenance and testing work.
89 220220KV Barwaha-Nimrani Tap Omkareshwar at 220KV S/s Barwaha 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.
90 220220KV Nimrani-Barwaha Tap Omkareshwar at 220KV S/s Nimrani 06-Jan-21 09:00 06-Jan-21 17:00 Daily For maintenance and testing work.
91 220220KV Barwaha-Indore-I at 220KV S/s Barwaha 05-Feb-21 09:00 05-Feb-21 18:00 Daily For maintenance and testing work.
92 220220KV Nimrani-Maheshwar-I at 220KV S/s Nimrani 06-Feb-21 09:00 06-Feb-21 17:00 Daily For maintenance and testing work.
93 220220KV Barwaha-Handiya at 220KV S/s Barwaha 05-Mar-21 09:00 05-Mar-21 18:00 Daily For maintenance and testing work.
94 220220KV Nimrani-Julwaniya at 220KV S/s Nimrani 06-Mar-21 09:00 06-Mar-21 17:00 Daily For maintenance and testing work.
95 220220KV Julwania-Omkareshwar at 220kV S/s Julwaniya 23-Mar-21 09:00 23-Mar-21 17:00 Daily For maintenance and testing work.
96 220 220KV Indore East at 400KV S/s Indore 05-Jan-21 09:00 05-Jan-21 18:00 Daily For maintenance and testing work.
97 220 220KV South Zone- I at 400KV S/s Indore
06-Jan-21 09:00 06-Jan-21 18:00 Daily For maintenance and testing work.
Minutes of 76th OCCM of MP 46
Date Time Date TimeSr- No
KV Line / Transformer / Reactor / BayFrom To Basis
(Daily/Continue)
Reason
98 220 220KV Pithampur at 400KV S/s Indore 07-Jan-21 09:00 07-Jan-21 18:00 Daily For 220KV R-Phase LA replacement99 220 220KV Barwaha I at 400KV S/s Indore 08-Jan-21 09:00 08-Jan-21 18:00 Daily For maintenance and testing work.100 220 220KV TBC at 400KV S/s Indore 11-Jan-21 09:00 11-Jan-21 18:00 Daily For maintenance and testing work.101 220 220KV Pithampur at 400KV S/s Indore 05-Mar-21 09:00 05-Mar-21 18:00 Daily For maintenance and testing work.102 220 220KV Badnagar at 400KV S/s Indore 06-Mar-21 09:00 06-Mar-21 18:00 Daily For maintenance and testing work.
103 220 220KV South Zone -I at 400KV S/s Indore
08-Mar-21 09:00 08-Mar-21 18:00 Daily For maintenance and testing work.
104 220 220KV South Zone -II at 400KV S/s Indore
09-Mar-21 09:00 09-Mar-21 18:00 Daily For maintenance and testing work.
105 220 220KV Jetpura at 400KV S/s Indore 10-Mar-21 09:00 10-Mar-21 18:00 Daily For maintenance and testing work.106 220 220KV Mangliya at 400KV S/s Indore 11-Mar-21 09:00 11-Mar-21 18:00 Daily For maintenance and testing work.107 220 220KV Dewas at 400KV S/s Indore 15-Mar-21 09:00 15-Mar-21 18:00 Daily For maintenance and testing work.
108 220 220KV Barwaha -I at 400KV S/s Indore 16-Mar-21 09:00 16-Mar-21 18:00 Daily For maintenance and testing work.
109 220 220KV Barwaha -II at 400KV S/s Indore 17-Mar-21 09:00 17-Mar-21 18:00 Daily For maintenance and testing work.
110 220 220KV Indore- East at 400KV S/s Indore 22-Mar-21 10:00 26-Mar-21 18:00 Continue Breaker Over hauling (Load on TBC )
111 220 220KV Interconnecter-I at 400KV S/s Pithampur
19-Mar-21 08:00 19-Mar-21 17:00 Daily For maintenance and testing work.
112 220 220KV Interconnecter-II at 400KV S/s Pithampur
20-Mar-21 08:00 20-Mar-21 17:00 Daily For maintenance and testing work.
113 220 220KV Pithampur Sector-I at 400KV S/s Pithampur
21-Mar-21 08:00 21-Mar-21 17:00 Daily For maintenance and testing work.
114 220 220KV Badnagar at 400KV S/s Pithampur 23-Mar-21 08:00 23-Mar-21 17:00 Daily For maintenance and testing work.
115 220 220KV Depalpur at 400KV S/s Pithampur 24-Mar-21 08:00 24-Mar-21 17:00 Daily For maintenance and testing work.
116 220 220KV Shujalpur-PGCIL-I at 220KV S/s Shujalpur
08-Jan-21 09:00 08-Jan-21 17:00 Daily For maintenance and testing work.
117 220 220KV Shujalpur-PGCIL-II at 220KV S/s Shujalpur
09-Jan-21 09:00 09-Jan-21 17:00 Daily For maintenance and testing work.
118 220 220KV Ujjain-PGCIL-I at 220KV S/S Ujjain
04-Jan-21 09:00 04-Jan-21 17:00 Daily For maintenance & Panel replacement work
119 220 220KV Ujjain-PGCIL-II at 220KV S/S Ujjain
11-Jan-21 09:00 11-Jan-21 17:00 Daily For maintenance & Panel replacement work
Minutes of 76th OCCM of MP 47
Annexure-4.1
A. ThermalStn. Name UNIT No.
CapacityMW Sep-20 Oct-20 Nov-20
5 210 147.37 156.50 149.15
PH III 210 147.37 156.50 149.15
TOT 210 147.37 156.50 149.15
6 200 0.00 12.49 15.12
7 210 0.00 40.45 92.73
PH II 410 0.00 52.94 107.85
8 210 0.00 0.00 0.00
9 210 0.00 0.00 0.00
PH III 420 0.00 0.00 0.00
10 250 73.52 179.83 147.49
11 250 153.30 176.41 173.51
PH IV 500 226.81 356.25 321.00
TOT 1330 226.81 409.19 428.85
1 210 79.56 128.88 109.82
2 210 89.88 100.44 122.67
PH I 420 169.44 229.32 232.49
3 210 0.02 51.87 122.34
4 210 108.73 108.23 123.25
PH II 420 108.75 160.09 245.59
5 500 226.27 331.92 354.85
PH III 500 226.27 331.92 354.85
TOT 1340 504.45 721.34 832.93
1 600 204.96 296.91 359.07
2 600 66.06 164.64 266.46
PH1 1200 271.02 461.55 625.53
3 660 0.00 0.00 0.00
4 660 94.65 0.00 0.00
PH II 1320 94.65 0.00 0.00
TOT 1860 365.67 461.55 625.53
4740 1244.30 1748.58 2036.46
B. HydelCapacity
MWSep-20 Oct-20 Nov-20
115.0 6.73 12.16 22.91172.0 0.00 0.00 0.00
99.0 14.13 23.42 42.75386.0 20.86 35.58 65.66193.0 10.43 17.79 32.83160.0 108.73 48.67 10.33107.0 72.49 32.45 6.89
90.0 54.13 40.87 18.20315.0 92.84 135.83 111.48
20.0 12.03 3.77 0.6260.0 25.81 30.08 0.0030.0 9.76 12.24 11.2845.0 28.48 7.87 15.9722.5 17.00 4.70 9.5320.0 12.09 12.60 14.1860.0 17.88 16.85 14.13
1186.0 382.61 344.35 261.85915.0 368.48 320.93 219.10917.5 324.45 307.16 219.14
CapacityMW
Sep-20 Oct-20 Nov-20
Indira Sagar Hydel Project 1000 706.20 211.68 120.21Omkareshwar Hydel Project 520 338.45 98.85 64.90
C. NHDC (Ex-Bus)Station Name
M.P.RAJGHATB.SGR(JINHA)MADIKHEDATOTAL HYDELMPPGCL HydelMPSEB HYDEL Share
BARGITONSBIRSINGHPURB.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHAT
R.P.SAGARJ.SAGARCHAMBALM.P.CHAMBAL
PENCHM.P.PENCH
MPPGCL THERMAL
Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.
Station Name
GANDHISAGAR
Unitwise / Stationwise Genration in MU
AM
AR
KA
NT
AK
SA
TP
UR
AS
AN
JA
Y G
AN
DH
IS
ST
PS
Ann 4.1
Minutes of 76th OCCM of MP 48
S No. Source Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Total
30 31 30 31 31 30 31 30 0 0 0 0 244
A.
1 Thermal 1154.07 1517.47 935.53 1895.85 1212.59 1146.01 1638.86 1903.36 0.00 0.00 0.00 0.00 11403.73
2 Hydel 161.23 169.23 170.62 200.93 264.08 321.29 302.49 216.60 0.00 0.00 0.00 0.00 1806.48
3 Total 1315.30 1686.70 1106.15 2096.78 1476.67 1467.30 1941.36 2119.96 0.00 0.00 0.00 0.00 13210.21
B.1 Indira Sagar 181.07 162.15 292.16 67.96 214.73 703.15 210.21 119.07 0.00 0.00 0.00 0.00 1950.49
2 Omkareshwar 93.20 89.67 186.06 47.31 107.47 338.45 98.85 64.90 0.00 0.00 0.00 0.00 1025.90
3 MPPMCL Schedule from Central Sector of WR 1676.81 1838.12 1587.89 2294.03 2137.08 1952.62 2166.13 2355.25 0.00 0.00 0.00 0.00 16007.95
4 MPPMCL Schedule from Central Sector ER 29.03 31.12 17.37 40.16 15.78 22.41 29.06 19.26 0.00 0.00 0.00 0.00 204.18
5 Total MPPMCL Schedule from Central Sector (WR+ER) 1705.84 1869.24 1605.26 2334.20 2152.86 1975.03 2195.19 2374.51 0.00 0.00 0.00 0.00 16212.13
6 Deviation Energy of (WR+ER) -26.49 -44.04 -67.05 -38.75 -79.00 -26.75 -52.06 -50.77 0.00 0.00 0.00 0.00 -384.90
7 NET NR ISGS POWER SCH to MP 33.77 36.02 23.24 67.10 23.39 44.42 14.24 12.51 0.00 0.00 0.00 0.00 254.70
8 RUMS SOLAR REWA (Scheduled Energy) 139.14 145.59 102.04 105.61 97.41 85.47 86.71 79.56 0.00 0.00 0.00 0.00 841.54
9 Schedule From Sugen 0.00 0.00 0.00 0.28 0.00 1.16 0.09 0.00 0.00 0.00 0.00 0.00 1.54
10 LANCO Amk 160.37 190.54 161.97 200.92 182.70 191.83 202.42 158.74 0.00 0.00 0.00 0.00 1449.50
11 SASAN 962.99 988.26 973.27 980.47 974.32 945.16 1018.85 979.38 0.00 0.00 0.00 0.00 7822.70
12 ESSAR (STOA against LTA) 0.00 0.00 0.00 0.00 0.00 0.61 2.57 6.66 0.00 0.00 0.00 0.00 9.84
13 J P Nigri 154.17 277.07 292.51 326.75 325.70 304.48 301.59 323.58 0.00 0.00 0.00 0.00 2305.85
14 MB Power 124.33 138.82 58.09 241.18 135.53 156.67 267.23 240.72 0.00 0.00 0.00 0.00 1362.56
15 JHABUA Power 1.79 53.37 40.84 124.91 60.13 55.74 115.77 109.93 0.00 0.00 0.00 0.00 562.49
16 Other Open Access Schedule other than MPPMCL Incl. Seci 25.21 -44.39 -102.81 -7.50 25.12 -95.92 -171.34 -200.92 0.00 0.00 0.00 0.00 -572.55
17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Schedule from Sardar Sarovar 102.42 72.63 257.75 89.98 87.10 491.79 104.97 61.60 0.00 0.00 0.00 0.00 1268.26
20 SCH to Railway from RGPPL_ebid 96.87 107.46 119.40 125.83 120.80 133.31 149.32 171.20 0.00 0.00 0.00 0.00 1024.19
21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 Schedule from Rihand+Matatila 4.80 9.82 10.95 13.54 15.98 19.05 20.11 9.64 0.00 0.00 0.00 0.00 103.89
23 MTOA / STOA FROM RAJASTHAN 0.00 0.00 0.00 0.00 0.00 41.76 43.15 41.76 0.00 0.00 0.00 0.00 126.67
24 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26 Additional Power Purchase 0.00 0.00 0.02 0.00 0.00 22.57 160.77 130.72 0.00 0.00 0.00 0.00 314.09
27 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28 Banking of Energy -218.38 -374.78 -480.43 -765.09 -622.52 -838.24 121.31 915.12 0.00 0.00 0.00 0.00 -2263.01
29 Sale of Power -1.88 -11.53 -65.88 -19.06 -75.75 -85.61 -38.16 -27.55 0.00 0.00 0.00 0.00 -325.43
30 Total MP Schedule (Including Railway) 3291.44 3458.12 2996.23 3819.12 3502.76 3449.30 4594.79 5387.18 0.00 0.00 0.00 0.00 30498.94
31 Total MP Drawal (Including Railway) 3264.95 3414.08 2929.18 3780.38 3423.76 3422.54 4542.73 5336.41 0.00 0.00 0.00 0.00 30114.04
32 Wheeled Energy of Tawa HEG 3.71 1.25 0.00 0.00 3.38 11.03 5.10 10.38 0.00 0.00 0.00 0.00 34.85
33 Wheeled Energy of Wind Farm 13.67 21.16 13.60 9.19 18.88 6.78 7.28 7.18 0.00 0.00 0.00 0.00 97.75
34 Wheeled Energy of Solar Plant 86.82 91.71 70.89 73.37 51.64 75.20 83.54 80.29 0.00 0.00 0.00 0.00 613.46
35 Wheeled Energy of Bio-Mass + Baggase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 0.99 1.33 1.11 1.65 4.77 4.27 2.15 1.07 0.00 0.00 0.00 0.00 17.33
37 Export to MSEB (Nepa-Dharni) Wheeling -11.95 -9.07 -4.83 -5.69 -5.24 -5.33 -5.96 -10.85 0.00 0.00 0.00 0.00 -58.90
38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -19.99 -24.47 -3.48 -36.39 -14.73 -13.28 -29.74 -19.35 0.00 0.00 0.00 0.00 -161.41
39 Energy Purchased by MP from Wind Farm 333.95 584.35 437.00 322.77 503.22 210.19 207.99 203.56 0.00 0.00 0.00 0.00 2803.03
40 Energy Purchased by MP from Solar Plant 156.85 167.48 128.20 131.57 92.58 127.61 140.11 132.62 0.00 0.00 0.00 0.00 1077.03
41 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP
0.00 39.66 116.67 15.73 13.66 91.34 174.71 193.89 0.00 0.00 0.00 0.00 645.66
42
Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW
2.45 3.22 2.60 3.22 2.62 2.40 3.40 3.59 0.00 0.00 0.00 0.00 23.51
43 Deviation Energy of ISP 1.16 1.59 2.17 1.40 1.57 3.05 1.48 1.14 0.00 0.00 0.00 0.00 13.56
44 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 1.13 0.22 0.65 0.15 0.56 0.00 0.00 0.00 0.00 2.70
45 Schedule Energy of JP BINA Power against LTOA 0.00 0.00 0.00 0.00 0.00 4.87 20.87 48.43 0.00 0.00 0.00 0.00 74.17
46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.00 0.00 -0.01 1.93 3.30 3.49 4.08 4.79 0.00 0.00 0.00 0.00 17.59
47 Chambal Complex Excess / less Overshare by MP -1.75 -2.02 -1.62 -4.41 -11.30 -3.85 -5.88 -10.51 0.00 0.00 0.00 0.00 -41.34
48 Rajghat Hydel Power Station Excess / Less Overshare by MP 0.89 0.23 -0.05 -0.04 1.27 4.46 0.75 2.67 0.00 0.00 0.00 0.00 10.17
49 State Supply (Ex-Power stn. Bus) 5421.33 6229.01 5275.82 6507.87 5888.47 6454.33 7403.16 8289.80 0.00 0.00 0.00 0.00 51469.79
50 AVERAGE DAILY (Ex-Bus) 180.71 200.94 175.86 209.93 189.95 215.14 238.81 276.33 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 210.94
51 MINIMUM DAILY (MP Periphery) 159.83 169.76 139.30 178.76 154.91 186.18 211.29 252.39 0.00 0.00 0.00 0.00 139.30
52 MAXIMUM DAILY (MP Periphery) 185.15 216.01 195.88 226.79 220.56 225.38 257.70 281.33 0.00 0.00 0.00 0.00 281.33
53 State Supply (Ex-Power st. Bus):- YEAR : 2019-20 6144.12 6714.64 6193.49 5839.82 5497.58 5154.90 5348.44 6699.76 7477.06 7430.43 7614.52 6043.82 47592.76
54 Year ((20-21)-(19-20))*100/Year (19-20) -11.76 -7.23 -14.82 11.44 7.11 25.21 38.42 23.73 -100.00 -100.00 -100.00 -100.00 8.15
55 Unshedule L/S : Year-2020-21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56 Frequency Correction 1.40 2.06 1.48 2.93 2.40 2.53 2.57 3.05 0.00 0.00 0.00 0.00 18.43
57 Restricted Requirement : Year-2020-21 5422.73 6231.07 5277.31 6510.80 5890.87 6456.86 7405.73 8292.85 0.00 0.00 0.00 0.00 51488.22
58 Shedule L/S : Year-2020-21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59 Un-Restricted Requirement : Year-2020-21 5422.73 6231.07 5277.31 6510.80 5890.87 6456.86 7405.73 8292.85 0.00 0.00 0.00 0.00 51488.22
ENERGY BALANCE SHEETYear : 2020 -21
All figures in Million Unit
M.P. Availability
Exchange with other States / Systems
29
Minutes of 76th OCCM of MP 49
S.NO. Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Yr 20-21
C.1 DEMAND MET 9000 10003 8940 10112 9774 10103 12546 14234 0 0 0 0 14234
2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
D.1 DEMAND MET 7562 8833 8048 9514 9012 9670 10741 12424 0 0 0 0 12424
2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
F. REGISTERED MAXIMUM 9000 10003 8940 10112 9774 10103 12546 14234 0 0 0 0 14234
G. COMPUTED MAXIMUM DEMAND 9008 10003 8940 10139 9774 10103 12546 14234 0 0 0 0 14234
H. UNRESTRICTED MAXIMUM DEMAND 9008 10003 8940 10139 9774 10103 12546 14234 0 0 0 0 14234
I.1. Div. Head Quarters 23:55 23:45 23:52 23:53 23:51 23:52 0:00 0:00 0:00 0:00 0:00 0:00 17:53
2. District Head Quarters 23:52 23:48 23:47 23:53 23:52 23:50 0:00 0:00 0:00 0:00 0:00 0:00 17:53
3. Tahsil Head Quarters 23:53 23:44 23:46 23:50 23:47 23:43 0:00 0:00 0:00 0:00 0:00 0:00 17:50
4. Rural -Mixed 23:47 23:35 23:38 23:41 23:33 23:26 0:00 0:00 0:00 0:00 0:00 0:00 17:42
5. Rural -DLF 23:48 23:34 23:34 23:40 23:34 23:28 0:00 0:00 0:00 0:00 0:00 0:00 17:42
6. Rural -Irrigation 9:55 9:50 9:49 9:54 9:50 9:48 0:00 0:00 0:00 0:00 0:00 0:00 7:23
J LOAD FACTOR % 83.66 83.70 81.96 86.50 80.98 88.73 79.31 80.89 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 83.22
S.N PARTICULARS Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Yr 20-21
A. INTGRATED FREQUENCY1 MAXIMUM 50.15 50.14 50.19 50.26 50.10 50.09 0.00 0.00 0.00 0.00 0.00 0.00 50.26
2 MINIMUM 49.87 49.86 49.86 49.81 49.77 49.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.30 50.29 50.31 50.39 50.23 50.20 0.00 0.00 0.00 0.00 0.00 0.00 50.39
2 MINIMUM 49.61 49.57 49.63 49.62 49.60 49.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C. AVG FREQUENCY 50.01 50.01 50.01 50.00 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 37.50
D. % TIME WHEN FREQUENCY WAS1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 50.05 TO 51.5 Hz 19.78 19.10 18.58 15.13 13.00 11.54 0.00 0.00 0.00 0.00 0.00 0.00 12.14
3 49.9 TO 50.05 Hz 75.13 76.67 76.91 78.16 80.92 84.23 0.00 0.00 0.00 0.00 0.00 0.00 59.00
4 49.7 TO 49.9 Hz 5.09 4.23 4.51 6.71 6.08 4.23 0.00 0.00 0.00 0.00 0.00 0.00 3.86
5 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2020 -21
MORNING PEAK (MAX)
EVENING PEAK (MAX)
Average Power Supply per day to
FREQUENCY ANALYSIS YEAR 2020-21
29
Minutes of 76th OCCM of MP 50
THER.Incl Aux
THER. Excl Aux
HYD. ISP OSP
Total IPPs
Injection
Total CPPs Injectio
n
Total CSSNet
NR to MP
Sugen
Lanco SasanEssa
rJP
Nigri
RUMS (SOLA
R) REWA TO
MPPMCL
MB Power
Jhabua
Power
SSP
SCH to
Railway
SEZ Banking Sale PurSTO
A
Rihand+
Matatila-
Rajghat
MTOA / STOA FROM RAJASTHAN
Total SCHUN
SCHTOTAL
1:00 50.01 1903 1765 494 981 476 138 383 4237 2974 79 2 264 1266 3 417 0 337 124 661 179 0 -1903 -7 80 -73 17 56 4476 8713 4496 21 -8 8726 0 0 0 8727 8727
2:00 50.01 1889 1753 486 979 477 140 392 4227 2979 76 7 264 1266 2 400 0 321 124 641 180 0 -1903 -10 80 -75 17 56 4425 8652 4344 -82 -8 8562 0 0 0 8563 8563
3:00 50.01 1892 1756 484 981 477 139 398 4234 2964 79 7 264 1268 1 398 0 308 118 642 177 0 -1903 -5 71 -76 17 56 4385 8619 4380 -5 -8 8607 0 0 0 8609 8609
4:00 50.01 1902 1765 483 978 475 134 393 4228 2945 68 7 264 1260 0 392 0 316 118 642 180 0 -1903 -8 71 -76 17 56 4349 8577 4364 15 -8 8584 0 0 0 8585 8585
5:00 49.99 1864 1729 478 978 475 134 391 4187 2909 66 5 264 1267 0 392 0 290 112 642 180 0 -1775 -21 71 -76 17 56 4398 8584 4436 38 -8 8615 0 0 0 8620 8620
6:00 50.00 1823 1692 465 978 478 133 373 4119 2781 48 0 264 1266 0 395 2 263 90 631 181 0 -1111 -32 12 -79 17 56 4785 8904 4701 -83 -8 8812 0 0 0 8815 8815
7:00 50.02 1836 1703 470 979 478 133 412 4175 2814 57 0 260 1259 0 402 40 304 104 634 181 0 -960 -7 18 -88 17 56 5091 9266 5024 -67 -8 9191 0 0 0 9192 9192
8:00 50.03 1742 1615 463 976 479 132 549 4215 2700 25 0 260 1262 0 402 134 239 78 634 180 0 -960 -6 6 -131 17 56 4897 9113 4724 -174 -8 8931 0 0 0 8932 8932
9:00 50.02 1653 1533 457 980 477 136 811 4395 2602 24 0 260 1269 0 402 265 160 63 636 177 0 -960 -10 0 -188 17 56 4773 9168 4730 -44 -7 9117 0 0 0 9119 9119
10:00 50.02 1546 1434 454 970 473 137 1007 4475 2468 18 0 260 1277 0 404 370 117 21 637 178 0 -960 -2 0 -225 17 56 4635 9111 4517 -118 -7 8986 0 0 0 8987 8987
11:00 50.01 1446 1341 446 963 474 137 1086 4447 2351 18 0 244 1280 0 402 418 56 19 656 181 0 -960 -30 0 -247 17 56 4461 8908 4369 -92 -6 8810 0 0 0 8812 8812
12:00 50.00 1430 1326 446 964 470 137 1102 4445 2139 18 0 233 1260 0 402 428 29 10 673 175 0 -960 -132 0 -254 16 56 4095 8540 3998 -97 -6 8436 0 0 0 8441 8441
13:00 50.00 1457 1352 440 963 462 137 1056 4409 2219 18 0 237 1270 0 403 390 39 12 675 170 0 -960 -142 0 -252 16 56 4151 8560 4140 -11 -6 8544 0 0 0 8548 8548
14:00 49.99 1484 1377 442 963 460 132 968 4342 2249 19 0 237 1275 0 403 333 58 12 681 170 0 -960 -115 0 -232 16 56 4204 8546 4182 -22 -6 8517 0 0 0 8523 8523
15:00 50.00 1527 1417 451 960 459 132 885 4304 2341 19 0 244 1281 0 411 254 80 19 681 168 0 -960 -109 0 -203 16 56 4300 8604 4228 -71 -6 8527 0 0 0 8531 8531
16:00 49.98 1573 1459 448 962 457 132 718 4175 2491 20 0 256 1289 0 417 153 108 25 682 176 0 -960 -105 0 -166 16 56 4459 8634 4257 -202 -6 8426 0 0 0 8432 8432
17:00 49.97 1633 1514 450 958 455 132 530 4039 2526 18 0 260 1290 0 417 53 146 36 682 180 0 -960 -102 0 -129 16 56 4488 8526 4406 -82 -6 8438 0 0 0 8447 8447
18:00 49.96 1675 1553 453 958 464 127 348 3903 2517 18 0 264 1286 0 418 6 171 50 688 177 0 -960 -79 0 -90 16 56 4539 8442 4394 -145 -7 8291 0 0 0 8301 8301
19:00 49.96 1913 1774 462 970 473 140 308 4127 2859 37 0 264 1288 4 425 0 319 132 706 177 0 -960 -284 80 -91 16 56 5029 9156 4896 -133 -8 9015 0 0 0 9028 9028
20:00 50.03 1945 1806 466 975 476 139 330 4192 2844 25 2 264 1279 4 428 0 324 134 703 185 0 -960 -465 80 -84 16 56 4836 9028 4678 -158 -8 8861 0 0 0 8863 8863
21:00 50.00 1806 1676 464 977 472 137 366 4093 2778 22 0 264 1278 4 428 0 298 129 703 184 0 -960 -492 74 -84 16 56 4699 8791 4523 -175 -8 8608 0 0 0 8612 8612
22:00 50.03 1792 1662 488 971 480 142 365 4106 2715 21 0 264 1264 2 428 0 262 95 702 184 0 -960 -497 65 -84 16 56 4535 8641 4470 -65 -9 8567 0 0 0 8568 8568
23:00 50.02 1832 1699 495 974 487 138 360 4154 2758 22 2 264 1266 1 428 0 265 93 700 186 0 -960 -163 41 -82 16 56 4895 9049 4902 7 -8 9047 0 0 0 9048 9048
24:00 50.03 1864 1729 495 978 487 138 366 4194 2736 21 2 264 1266 1 428 0 237 80 689 183 0 -960 -113 41 -78 16 56 4870 9064 4699 -171 -8 8884 0 0 0 8885 8885
Avg. 50.00 1726 1601 466 972 472 136 579 4226 2653 35 2 258 1272 1 410 119 210 75 667 179 0 -1157 -122 33 -132 16 56 4574 8800 4494 -80 -7 8713 0 0 0 8716 8716
00 TO 06 HRS.
50.01 1879 1743 482 979 476 137 388 4205 2925 69 5 264 1266 1 399 0 306 114 643 179 0 -1750 -14 64 -76 17 56 4470 8675 4454 -16 -8 8651 0 0 0 8653 8653
06 TO 12 HRS.
50.01 1609 1492 456 972 475 135 828 4359 2512 27 0 253 1268 0 402 276 151 49 645 179 0 -960 -31 4 -189 17 56 4659 9017 4560 -99 -7 8912 0 0 0 8914 8914
12 TO 18 HRS.
49.99 1558 1445 447 960 459 132 751 4195 2391 18 0 250 1282 0 411 198 100 26 681 174 0 -960 -109 0 -179 16 56 4357 8552 4268 -89 -6 8457 0 0 0 8464 8464
06TO 18 HRS.
50.00 1584 1469 452 966 467 134 789 4277 2452 23 0 251 1275 0 407 237 126 37 663 176 0 -960 -70 2 -184 16 56 4508 8785 4414 -94 -7 8684 0 0 0 8689 8689
18 TO 24 HRS.
50.01 1859 1724 478 974 479 139 349 4144 2782 25 1 264 1274 3 427 0 284 110 700 183 0 -960 -336 64 -84 16 56 4811 8955 4694 -116 -8 8830 0 0 0 8834 8834
Devia -tion
Export to MS
DEMAND MET
Load Shedding
REST. DEMAN
D
UNREST.
DEMAND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2020
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
TotAvl.
Act.Drl
Minutes of 76th OCCM of MP 51
THER.Incl Aux
THER. Excl Aux
HYD. ISP OSP
Total IPPs
Injection
Total CPPs
Injection
Total CSSNet
NR to MP
Sugen
Lanco
Sasan
Essar
JP Nigri
RUMS (SOLAR)
REWA TO
MPPMCL
MB Power
Jhabua
Power
SSP
SCH to
Railway
SEZ
Banking Sale PurSTO
A
Rihand+
Matatila-
Rajghat
MTOA / STOA FROM RAJASTHAN
Total SCHUN
SCHTOTAL
1:00 50.01 2308 2138 431 299 137 248 390 3644 2818 16 0 265 1333 0 395 0 356 169 153 198 0 141 0 217 -185 23 56 5957 9601 5899 -58 -8 9534 0 0 0 9536 9536
2:00 50.01 2310 2139 400 245 121 254 360 3519 2697 15 0 265 1328 0 385 0 356 136 153 202 0 141 -6 211 -190 23 56 5773 9292 5604 -170 -8 9115 0 0 0 9116 9116
3:00 50.01 2324 2152 398 224 108 254 341 3477 2736 15 0 265 1325 0 384 0 356 152 153 194 0 141 -8 211 -190 23 56 5814 9292 5825 11 -8 9294 0 0 0 9296 9296
4:00 50.02 2361 2188 398 248 117 254 332 3536 2800 14 0 265 1318 0 378 0 356 163 153 200 0 141 -9 211 -190 23 56 5880 9416 5853 -27 -8 9381 0 0 0 9382 9382
5:00 49.98 2365 2192 400 247 117 254 326 3536 2856 15 0 265 1321 1 378 0 356 169 153 199 0 141 -8 220 -190 23 56 5954 9490 5902 -52 -8 9430 0 0 0 9437 9437
6:00 50.00 2377 2202 410 262 127 254 322 3577 2938 15 0 265 1324 2 385 2 356 169 153 198 0 141 -5 226 -191 23 56 6056 9633 5962 -94 -8 9530 0 0 0 9535 9535
7:00 50.01 2412 2235 467 398 186 294 375 3955 3261 32 0 265 1325 9 387 16 367 175 150 199 0 141 0 249 -174 23 56 6481 10436 6526 45 -9 10472 0 0 0 10475 10475
8:00 50.04 2398 2222 475 432 211 305 615 4260 3122 30 0 265 1327 10 388 103 360 175 150 199 0 189 -5 249 -204 23 56 6439 10699 6204 -235 -9 10455 0 0 0 10455 10455
9:00 50.03 2382 2208 455 362 179 289 803 4295 3056 33 2 265 1327 5 389 263 360 175 149 188 0 189 -13 223 -267 23 56 6423 10718 6399 -24 -8 10686 0 0 0 10687 10687
10:00 50.03 2345 2172 428 321 160 268 1022 4371 2843 18 0 261 1332 3 388 387 360 158 148 189 0 189 -7 223 -326 23 56 6246 10616 6145 -101 -8 10508 0 0 0 10508 10508
11:00 50.00 2252 2086 387 268 135 251 1174 4301 2702 16 0 261 1333 2 388 452 348 135 132 192 0 189 -12 211 -375 23 56 6054 10355 6004 -50 -7 10297 0 0 0 10300 10300
12:00 50.01 2179 2017 388 258 122 251 1222 4258 2493 15 0 257 1333 0 389 456 292 84 126 177 0 189 -17 158 -383 23 56 5649 9907 5401 -248 -7 9652 0 0 0 9654 9654
13:00 49.99 2277 2109 372 222 114 251 1162 4231 2637 14 0 261 1333 1 389 417 327 118 124 180 0 189 -5 170 -377 23 56 5858 10088 5897 40 -7 10121 0 0 0 10127 10127
14:00 50.00 2349 2177 377 243 118 252 1038 4205 2738 15 0 261 1333 2 392 350 355 144 126 182 0 189 0 202 -355 23 56 6014 10218 6080 67 -7 10278 0 0 0 10283 10283
15:00 49.99 2417 2242 384 269 118 260 868 4141 2915 14 0 265 1333 3 399 233 360 165 126 182 0 189 -3 229 -299 23 56 6190 10331 6237 47 -7 10371 0 0 0 10378 10378
16:00 49.99 2455 2277 395 280 117 281 629 3978 3129 15 0 265 1333 5 402 103 360 175 125 192 0 189 0 229 -254 23 56 6345 10323 6319 -26 -7 10291 0 0 0 10297 10297
17:00 49.96 2463 2285 391 303 126 301 343 3749 3230 15 0 265 1333 8 408 14 360 175 124 185 0 189 -5 237 -196 23 56 6422 10170 6491 69 -7 10232 0 0 0 10245 10245
18:00 49.97 2464 2286 405 325 147 288 233 3684 3031 18 0 265 1333 8 412 3 360 175 129 197 0 189 -114 234 -158 23 56 6160 9844 5819 -341 -9 9495 0 0 0 9507 9507
19:00 50.02 2439 2262 393 285 137 275 285 3637 3103 24 0 265 1335 10 413 1 380 175 133 201 0 141 -487 255 -132 23 56 5897 9534 5680 -217 -9 9308 0 0 0 9309 9309
20:00 50.04 2258 2092 396 240 121 255 351 3454 2732 22 0 265 1338 5 403 0 342 105 142 197 0 141 -251 237 -177 23 56 5580 9035 5328 -252 -9 8773 0 0 0 8773 8773
21:00 50.01 2158 1997 406 211 108 252 392 3366 2522 19 0 265 1336 1 403 0 264 89 144 202 0 141 -197 155 -187 23 56 5237 8603 5126 -111 -9 8482 0 0 0 8484 8484
22:00 50.04 2187 2024 412 225 113 252 404 3430 2470 20 0 265 1333 1 402 0 280 73 144 206 0 141 -57 155 -189 23 56 5323 8753 5230 -94 -9 8651 0 0 0 8651 8651
23:00 50.03 2392 2217 443 301 140 251 397 3749 2920 21 0 265 1333 5 401 0 369 171 141 199 0 141 -7 243 -191 23 56 6091 9840 6139 48 -8 9880 0 0 0 9880 9880
24:00 50.02 2427 2251 454 339 142 249 395 3829 2862 18 0 265 1333 5 401 0 369 181 126 204 0 141 -1 243 -189 23 56 6037 9866 5936 -101 -8 9757 0 0 0 9759 9759
Avg. 50.01 2346 2174 411 284 134 264 574 3841 2859 19 0 264 1331 4 394 117 348 150 140 194 0 163 -51 216 -232 23 56 5995 9836 5917 -78 -8 9750 0 0 0 9753 9753
00 TO 06 HRS.
50.00 2341 2168 406 254 121 253 345 3548 2807 15 0 265 1325 1 384 0 356 159 153 199 0 141 -6 216 -189 23 56 5906 9454 5841 -65 -8 9381 0 0 0 9384 9384
06 TO 12 HRS.
50.02 2328 2157 433 340 165 276 869 4240 2913 24 0 262 1330 5 388 280 348 150 143 191 0 181 -9 219 -288 23 56 6215 10455 6113 -102 -8 10345 0 0 0 10347 10347
12 TO 18 HRS.
49.98 2404 2229 387 274 123 272 712 3998 2947 15 0 263 1333 4 400 187 353 158 126 186 0 189 -21 217 -273 23 56 6165 10163 6141 -24 -7 10131 0 0 0 10139 10139
06TO 18 HRS.
50.00 2366 2193 410 307 144 274 790 4119 2930 20 0 263 1331 5 394 233 351 154 134 188 0 185 -15 218 -281 23 56 6190 10309 6127 -63 -8 10238 0 0 0 10243 10243
18 TO 24 HRS.
50.03 2310 2140 417 267 127 256 371 3577 2768 21 0 265 1335 4 404 0 334 132 138 202 0 141 -167 215 -178 23 56 5694 9272 5573 -121 -9 9142 0 0 0 9143 9143
TotAvl.
Act.Drl
Devia -tion
Export to MS
DEMAND MET
Load Shedding
REST. DEMAN
D
UNREST.
DEMAND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2020
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
Minutes of 76th OCCM of MP 52
THER.Incl Aux
THER. Excl Aux
HYD. ISP OSP
Total IPPs
Injection
Total CPPs Injectio
n
Total CSSNet
NR to MP
Sugen
Lanco SasanEssa
rJP
Nigri
RUMS (SOLA
R) REWA TO
MPPMCL
MB Power
Jhabua
Power
SSP
SCH to
Railway
SEZ Banking Sale PurSTO
A
Rihand+
Matatila-
Rajghat
MTOA / STOA FROM RAJASTHAN
Total SCHUN
SCHTOTAL
1:00 48.38 2623 2430 233 77 42 297 485 3564 2788 13 0 200 1276 7 411 0 312 120 84 224 0 610 0 147 -249 8 54 6006 9569 5797 -209 -13 9348 0 0 0 9358 9358
2:00 48.39 2445 2262 224 43 23 297 463 3313 2690 13 0 192 1272 7 410 0 233 82 85 224 0 610 0 147 -249 8 54 5780 9093 5535 -245 -12 8836 0 0 0 8838 8838
3:00 48.39 2490 2303 217 43 19 297 464 3344 2720 13 0 192 1272 7 410 0 254 91 84 225 0 610 0 146 -251 8 54 5836 9181 5801 -36 -12 9133 0 0 0 9136 9136
4:00 48.38 2530 2341 218 43 19 298 427 3347 2800 13 0 205 1272 7 410 0 281 121 84 223 0 610 0 163 -250 8 54 6002 9348 5927 -75 -12 9262 0 0 0 9267 9267
5:00 48.37 2630 2436 225 67 46 298 402 3474 2826 14 0 208 1274 7 410 0 310 132 84 223 0 610 0 171 -251 8 54 6081 9555 5999 -82 -12 9462 0 0 0 9469 9469
6:00 48.40 2780 2577 266 99 101 298 398 3738 3055 18 0 204 1277 7 413 1 338 161 83 224 0 610 0 176 -251 8 54 6379 10117 6364 -14 -13 10090 0 0 0 10092 10092
7:00 48.38 2860 2652 352 173 122 359 404 4063 3474 34 0 204 1280 8 418 11 342 172 83 222 0 1562 0 202 -190 8 54 7884 11947 8093 209 -15 12141 0 0 0 12148 12148
8:00 48.41 2880 2671 429 321 169 408 621 4619 3589 23 0 204 1280 12 421 64 342 173 83 222 0 1884 0 212 -172 8 54 8399 13018 8173 -227 -15 12776 0 0 0 12778 12778
9:00 48.38 2889 2680 409 283 153 380 826 4731 3575 20 0 204 1280 13 423 216 342 173 83 219 0 1884 -3 202 -234 8 54 8459 13190 8358 -101 -15 13074 0 0 0 13080 13080
10:00 48.40 2874 2665 371 246 132 333 959 4706 3394 15 0 204 1280 14 423 343 342 173 82 216 0 1884 -5 202 -297 8 54 8332 13038 8206 -126 -16 12896 0 0 0 12898 12898
11:00 48.40 2834 2628 351 292 146 299 1092 4807 3168 13 0 204 1280 9 423 417 342 168 82 218 0 1884 -4 190 -440 8 54 8016 12823 7807 -209 -15 12599 0 0 0 12602 12602
12:00 48.40 2785 2581 302 238 130 297 1123 4671 2754 12 0 212 1276 8 423 438 307 141 82 214 0 1884 -10 148 -460 8 54 7491 12162 7137 -353 -15 11793 0 0 0 11795 11795
13:00 48.38 2828 2622 250 154 92 300 1083 4502 3064 12 0 212 1268 7 423 417 342 157 76 214 0 1884 -3 173 -449 8 54 7858 12360 7873 15 -15 12360 0 0 0 12368 12368
14:00 48.39 2844 2638 268 170 94 303 976 4448 3149 12 0 212 1256 7 423 343 342 173 73 215 0 1884 -8 187 -416 8 54 7916 12365 7918 1 -15 12351 0 0 0 12355 12355
15:00 48.38 2882 2674 280 172 90 331 790 4338 3406 15 0 212 1254 7 429 224 342 179 74 214 0 1884 -3 196 -364 8 54 8131 12469 8127 -5 -16 12448 0 0 0 12456 12456
16:00 48.37 2883 2675 314 225 110 390 489 4204 3547 15 0 212 1254 11 430 75 348 179 80 217 0 1884 -15 198 -239 8 54 8259 12463 8288 30 -16 12477 0 0 0 12485 12485
17:00 48.37 2886 2678 352 353 159 422 188 4151 3566 19 0 212 1254 12 430 14 348 179 80 218 0 1884 -20 198 -144 8 54 8313 12464 8253 -60 -15 12388 0 0 0 12400 12400
18:00 48.38 2883 2675 336 290 143 418 162 4024 3523 23 0 212 1253 12 430 2 348 179 84 223 0 1698 -180 198 -114 8 54 7952 11976 7276 -676 -17 11283 0 0 0 11291 11291
19:00 48.42 2831 2626 313 202 96 342 251 3829 3283 22 0 212 1256 12 424 0 348 166 84 221 0 610 -299 191 -195 8 54 6396 10225 6166 -230 -16 9979 0 0 0 9979 9979
20:00 48.41 2644 2450 283 153 69 303 330 3588 2698 19 0 208 1262 9 422 0 293 131 83 223 0 610 -294 159 -244 8 54 5643 9231 5471 -172 -17 9042 0 0 0 9042 9042
21:00 48.39 2445 2263 264 59 38 297 386 3306 2465 15 0 198 1264 8 417 0 170 18 84 224 0 610 -118 118 -243 8 54 5293 8599 5100 -193 -17 8390 0 0 0 8392 8392
22:00 48.42 2417 2236 254 70 36 296 437 3329 2496 13 0 196 1264 7 413 0 169 15 84 223 0 610 -66 115 -245 8 54 5358 8687 5162 -196 -15 8476 0 0 0 8476 8476
23:00 48.40 2678 2482 253 90 50 297 470 3642 2958 14 0 204 1265 7 412 0 326 161 84 224 0 610 0 192 -250 8 54 6268 9911 6218 -51 -14 9846 0 0 0 9847 9847
24:00 48.42 2700 2502 247 107 59 296 489 3701 2868 13 0 204 1268 7 411 0 327 145 86 223 0 610 0 183 -249 8 54 6158 9859 5997 -160 -13 9685 0 0 0 9685 9685
Avg. 48.39 2731 2531 292 165 89 327 572 3977 3077 16 0 205 1268 9 419 107 310 141 82 221 0 1226 -43 176 -269 8 54 7009 10985 6877 -132 -15 10839 0 0 0 10843 10843
00 TO 06 HRS.
48.38 2583 2392 230 62 42 297 440 3463 2813 14 0 200 1274 7 410 0 288 118 84 224 0 610 0 158 -250 8 54 6014 9477 5904 -110 -12 9355 0 0 0 9360 9360
06 TO 12 HRS.
48.39 2854 2646 369 259 142 346 838 4599 3326 20 0 205 1279 11 422 248 336 167 83 219 0 1831 -4 193 -299 8 54 8097 12696 7962 -135 -15 12546 0 0 0 12550 12550
12 TO 18 HRS.
48.38 2868 2660 300 227 115 361 615 4278 3376 16 0 212 1256 10 427 179 345 174 78 217 0 1853 -38 191 -288 8 54 8072 12350 7956 -116 -16 12218 0 0 0 12226 12226
06TO 18 HRS.
48.39 2861 2653 335 243 128 353 726 4439 3351 18 0 209 1268 10 424 214 341 171 80 218 0 1842 -21 192 -293 8 54 8084 12523 7959 -125 -16 12382 0 0 0 12388 12388
18 TO 24 HRS.
48.41 2619 2426 269 113 58 305 394 3566 2795 16 0 204 1263 8 417 0 272 106 84 223 0 610 -130 160 -237 8 54 5853 9419 5686 -167 -15 9236 0 0 0 9237 9237
TotAvl.
Act.Drl
Devia -tion
Export to MS
DEMAND MET
Load Shedding
REST. DEMAN
D
UNREST.
DEMAND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2020
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
Minutes of 76th OCCM of MP 53
SCHDemand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
Demand
Total Sch
Total Drawal
1:00 50.01 2956 2963 6 0 0 2963 2963 3373 3378 5 0 0 3378 3378 2205 2210 5 0 0 2211 2211 179 175
2:00 50.01 2890 2860 -29 0 0 2861 2861 3369 3334 -35 0 0 3334 3334 2214 2192 -22 0 0 2193 2193 180 176
3:00 50.01 2939 2937 -3 0 0 2937 2937 3300 3296 -4 0 0 3297 3297 2203 2202 -2 0 0 2202 2202 177 173
4:00 50.01 2925 2929 4 0 0 2930 2930 3274 3277 3 0 0 3277 3277 2198 2202 4 0 0 2202 2202 180 176
5:00 49.99 2879 2891 13 0 0 2893 2893 3267 3279 13 0 0 3281 3281 2259 2268 9 0 0 2269 2269 180 176
6:00 50.00 2815 2786 -28 0 0 2787 2787 3398 3363 -34 0 0 3364 3364 2510 2485 -25 0 0 2486 2486 181 178
7:00 50.02 2878 2856 -22 0 0 2856 2856 3464 3437 -27 0 0 3437 3437 2743 2721 -22 0 0 2721 2721 181 178
8:00 50.03 2821 2764 -57 0 0 2764 2764 3252 3187 -65 0 0 3188 3188 2859 2803 -56 0 0 2803 2803 180 177
9:00 50.02 2766 2752 -14 0 0 2752 2752 3456 3438 -18 0 0 3438 3438 2769 2754 -15 0 0 2755 2755 177 173
10:00 50.02 2784 2746 -38 0 0 2747 2747 3453 3406 -47 0 0 3407 3407 2696 2659 -36 0 0 2660 2660 178 174
11:00 50.01 2770 2741 -29 0 0 2741 2741 3362 3326 -36 0 0 3327 3327 2595 2566 -29 0 0 2567 2567 181 177
12:00 50.00 2619 2587 -31 0 0 2589 2589 3264 3226 -38 0 0 3227 3227 2482 2453 -29 0 0 2454 2454 175 170
13:00 50.00 2678 2674 -4 0 0 2675 2675 3229 3222 -7 0 0 3224 3224 2483 2478 -5 0 0 2479 2479 170 170
14:00 49.99 2647 2639 -8 0 0 2641 2641 3218 3207 -11 0 0 3209 3209 2510 2501 -9 0 0 2503 2503 170 170
15:00 50.00 2659 2634 -25 0 0 2636 2636 3243 3215 -28 0 0 3217 3217 2533 2510 -24 0 0 2511 2511 168 167
16:00 49.98 2657 2592 -65 0 0 2594 2594 3256 3176 -80 0 0 3178 3178 2545 2483 -62 0 0 2485 2485 176 175
17:00 49.97 2567 2541 -27 0 0 2543 2543 3224 3191 -33 0 0 3194 3194 2555 2529 -26 0 0 2532 2532 180 178
18:00 49.96 2588 2540 -48 0 0 2543 2543 3106 3048 -58 0 0 3052 3052 2572 2525 -47 0 0 2528 2528 177 178
19:00 49.96 3057 3007 -50 0 0 3011 3011 3204 3153 -52 0 0 3157 3157 2718 2675 -43 0 0 2680 2680 177 180
20:00 50.03 3093 3035 -57 0 0 3036 3036 3177 3117 -60 0 0 3118 3118 2573 2525 -48 0 0 2525 2525 185 184
21:00 50.00 3064 3001 -64 0 0 3002 3002 3115 3049 -67 0 0 3050 3050 2428 2376 -52 0 0 2377 2377 184 182
22:00 50.03 3030 3004 -26 0 0 3004 3004 3063 3036 -27 0 0 3036 3036 2365 2345 -20 0 0 2345 2345 184 182
23:00 50.02 3073 3073 1 0 0 3074 3074 3465 3465 0 0 0 3465 3465 2325 2325 1 0 0 2325 2325 186 184
24:00 50.03 3087 3026 -61 0 0 3026 3026 3484 3414 -70 0 0 3414 3414 2309 2263 -45 0 0 2264 2264 183 181
Avg. 50.00 2843 2816 -28 0 0 2817 2817 3292 3260 -32 0 0 3261 3261 2485 2460 -25 0 0 2461 2461 179 176
00 TO 06 HRS.
50.01 2901 2894 -6 0 0 2895 2895 3330 3321 -9 0 0 3322 3322 2265 2260 -5 0 0 2260 2260 179 176
06 TO 12 HRS.
50.01 2773 2741 -32 0 0 2742 2742 3375 3337 -39 0 0 3337 3337 2691 2659 -31 0 0 2660 2660 179 175
12 TO 18 HRS.
49.99 2633 2603 -29 0 0 2605 2605 3213 3177 -36 0 0 3179 3179 2533 2504 -29 0 0 2506 2506 174 173
06TO 18 HRS.
50.00 2703 2672 -31 0 0 2674 2674 3294 3257 -37 0 0 3258 3258 2612 2582 -30 0 0 2583 2583 176 174
18 TO 24 HRS.
50.01 3067 3024 -43 0 0 3026 3026 3252 3206 -46 0 0 3207 3207 2453 2418 -35 0 0 2419 2419 183 182
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2020
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Minutes of 76th OCCM of MP 54
SCHDemand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
Demand
Total Sch
Total Drawal
1:00 50.01 2895 2875 -19 0 0 2876 2876 3501 3478 -24 0 0 3478 3478 3006 2986 -20 0 0 2987 2987 198 195
2:00 50.01 2782 2730 -52 0 0 2730 2730 3405 3340 -65 0 0 3341 3341 2904 2845 -59 0 0 2845 2845 202 199
3:00 50.01 2790 2793 2 0 0 2793 2793 3329 3331 2 0 0 3332 3332 2978 2978 1 0 0 2979 2979 194 192
4:00 50.02 2799 2790 -10 0 0 2790 2790 3338 3327 -11 0 0 3327 3327 3078 3067 -11 0 0 3067 3067 200 198
5:00 49.98 2777 2760 -17 0 0 2762 2762 3385 3364 -21 0 0 3367 3367 3128 3109 -20 0 0 3111 3111 199 197
6:00 50.00 2704 2675 -28 0 0 2677 2677 3505 3468 -37 0 0 3470 3470 3226 3192 -35 0 0 3193 3193 198 195
7:00 50.01 2873 2883 10 0 0 2884 2884 3674 3688 13 0 0 3689 3689 3690 3705 14 0 0 3706 3706 199 196
8:00 50.04 2892 2825 -67 0 0 2825 2825 3510 3430 -81 0 0 3430 3430 4097 4003 -94 0 0 4003 4003 199 197
9:00 50.03 2808 2800 -8 0 0 2801 2801 3743 3732 -10 0 0 3732 3732 3979 3968 -11 0 0 3968 3968 188 186
10:00 50.03 2793 2765 -28 0 0 2765 2765 3719 3682 -38 0 0 3682 3682 3915 3876 -39 0 0 3876 3876 189 186
11:00 50.00 2774 2759 -15 0 0 2759 2759 3607 3588 -20 0 0 3589 3589 3782 3762 -20 0 0 3763 3763 192 189
12:00 50.01 2608 2542 -66 0 0 2542 2542 3463 3375 -88 0 0 3376 3376 3659 3561 -97 0 0 3562 3562 177 174
13:00 49.99 2643 2653 10 0 0 2655 2655 3402 3414 12 0 0 3416 3416 3863 3877 14 0 0 3879 3879 180 177
14:00 50.00 2601 2617 17 0 0 2618 2618 3406 3428 21 0 0 3429 3429 4030 4055 25 0 0 4057 4057 182 179
15:00 49.99 2635 2647 12 0 0 2649 2649 3430 3445 15 0 0 3447 3447 4084 4100 16 0 0 4103 4103 182 179
16:00 49.99 2634 2626 -9 0 0 2627 2627 3457 3446 -11 0 0 3448 3448 4040 4030 -11 0 0 4032 4032 192 190
17:00 49.96 2627 2644 17 0 0 2647 2647 3494 3518 23 0 0 3522 3522 3864 3888 24 0 0 3893 3893 185 182
18:00 49.97 2847 2745 -101 0 0 2748 2748 3414 3292 -122 0 0 3296 3296 3388 3265 -123 0 0 3269 3269 197 194
19:00 50.02 3101 3027 -74 0 0 3027 3027 3233 3156 -77 0 0 3156 3156 2999 2927 -72 0 0 2928 2928 201 198
20:00 50.04 3028 2940 -88 0 0 2940 2940 3070 2980 -90 0 0 2980 2980 2739 2659 -81 0 0 2659 2659 197 195
21:00 50.01 2922 2882 -40 0 0 2882 2882 2898 2858 -41 0 0 2858 2858 2580 2544 -37 0 0 2544 2544 202 199
22:00 50.04 2865 2831 -34 0 0 2831 2831 2861 2827 -34 0 0 2827 2827 2821 2789 -32 0 0 2789 2789 206 203
23:00 50.03 2949 2961 13 0 0 2961 2961 3529 3544 15 0 0 3544 3544 3163 3178 15 0 0 3178 3178 199 196
24:00 50.02 2947 2914 -32 0 0 2915 2915 3545 3506 -39 0 0 3507 3507 3171 3136 -35 0 0 3137 3137 204 201
Avg. 50.01 2804 2779 -25 0 0 2779 2779 3413 3384 -29 0 0 3385 3385 3424 3396 -29 0 0 3397 3397 194 191
00 TO 06 HRS.
50.00 2791 2771 -21 0 0 2771 2771 3411 3385 -26 0 0 3386 3386 3053 3029 -24 0 0 3031 3031 199 196
06 TO 12 HRS.
50.02 2791 2762 -29 0 0 2763 2763 3620 3582 -37 0 0 3583 3583 3854 3813 -41 0 0 3813 3813 191 188
12 TO 18 HRS.
49.98 2665 2655 -9 0 0 2657 2657 3434 3424 -10 0 0 3426 3426 3878 3869 -9 0 0 3872 3872 186 183
06TO 18 HRS.
50.00 2728 2709 -19 0 0 2710 2710 3527 3503 -24 0 0 3505 3505 3866 3841 -25 0 0 3843 3843 188 186
18 TO 24 HRS.
50.03 2969 2926 -43 0 0 2926 2926 3189 3145 -44 0 0 3145 3145 2912 2872 -40 0 0 2872 2872 202 199
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- October 2020
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Minutes of 76th OCCM of MP 55
SCHDemand
MetO/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
DemandSCH
Demand Met
O/U DRL
SCH LS
Unsch LS
Restricted
Demand
Unrestricted
Demand
Total Sch
Total Drawal
1:00 49.99 2814 2747 -66 0 0 2749 2749 3316 3239 -77 0 0 3241 3241 3523 3441 -82 0 0 3443 3443 231 228
2:00 50.00 2581 2508 -73 0 0 2509 2509 3076 2986 -90 0 0 2987 2987 3507 3407 -100 0 0 3408 3408 232 229
3:00 50.00 2621 2608 -13 0 0 2609 2609 3196 3180 -16 0 0 3181 3181 3437 3420 -18 0 0 3421 3421 232 229
4:00 50.00 2611 2587 -24 0 0 2588 2588 3233 3204 -29 0 0 3205 3205 3585 3553 -32 0 0 3554 3554 231 228
5:00 49.98 2630 2603 -27 0 0 2605 2605 3267 3236 -31 0 0 3238 3238 3746 3711 -35 0 0 3714 3714 231 227
6:00 50.01 2650 2644 -6 0 0 2644 2644 3424 3415 -9 0 0 3416 3416 4148 4138 -10 0 0 4139 4139 232 228
7:00 49.99 3189 3242 53 0 0 3244 3244 4050 4118 68 0 0 4121 4121 4877 4959 82 0 0 4962 4962 230 226
8:00 50.02 3414 3350 -64 0 0 3351 3351 4214 4135 -79 0 0 4136 4136 5594 5490 -104 0 0 5491 5491 230 226
9:00 50.00 3461 3431 -30 0 0 3433 3433 4354 4317 -37 0 0 4319 4319 5588 5538 -50 0 0 5541 5541 226 223
10:00 50.01 3428 3390 -37 0 0 3391 3391 4319 4272 -47 0 0 4272 4272 5502 5444 -59 0 0 5444 5444 223 220
11:00 50.01 3501 3439 -62 0 0 3439 3439 4264 4190 -74 0 0 4191 4191 5261 5169 -92 0 0 5170 5170 225 222
12:00 50.01 3129 3033 -96 0 0 3033 3033 3972 3850 -121 0 0 3851 3851 5245 5085 -160 0 0 5086 5086 221 218
13:00 49.99 3191 3192 1 0 0 3194 3194 4157 4158 1 0 0 4161 4161 5204 5204 0 0 0 5208 5208 221 218
14:00 50.00 3115 3112 -3 0 0 3113 3113 4099 4095 -3 0 0 4097 4097 5341 5336 -5 0 0 5338 5338 223 219
15:00 49.99 3144 3139 -5 0 0 3141 3141 4059 4054 -6 0 0 4056 4056 5461 5453 -8 0 0 5456 5456 221 218
16:00 49.98 3149 3153 4 0 0 3155 3155 4102 4107 6 0 0 4110 4110 5404 5411 8 0 0 5415 5415 224 221
17:00 49.98 3254 3234 -19 0 0 3237 3237 4244 4218 -25 0 0 4222 4222 5157 5127 -30 0 0 5132 5132 225 222
18:00 49.99 3545 3337 -208 0 0 3339 3339 4063 3823 -239 0 0 3826 3826 4537 4272 -265 0 0 4275 4275 230 227
19:00 50.03 3503 3418 -85 0 0 3418 3418 3620 3532 -88 0 0 3532 3532 3215 3137 -78 0 0 3137 3137 228 225
20:00 50.03 3314 3245 -69 0 0 3245 3245 3227 3160 -67 0 0 3161 3161 2767 2710 -57 0 0 2710 2710 231 227
21:00 50.01 3152 3074 -78 0 0 3075 3075 2908 2836 -72 0 0 2837 2837 2594 2531 -63 0 0 2532 2532 231 228
22:00 50.04 2852 2783 -70 0 0 2783 2783 2787 2718 -69 0 0 2718 2718 3107 3031 -76 0 0 3031 3031 231 227
23:00 50.02 2913 2894 -19 0 0 2895 2895 3441 3420 -21 0 0 3421 3421 3655 3632 -23 0 0 3632 3632 232 228
24:00 50.03 2854 2800 -54 0 0 2800 2800 3417 3359 -58 0 0 3359 3359 3685 3622 -63 0 0 3622 3622 231 227
Avg. 50.00 3084 3040 -44 0 0 3041 3041 3700 3651 -49 0 0 3652 3652 4339 4284 -55 0 0 4286 4286 228 225
00 TO 06 HRS.
50.00 2651 2616 -35 0 0 2617 2617 3252 3210 -42 0 0 3211 3211 3658 3612 -46 0 0 3613 3613 231 228
06 TO 12 HRS.
50.01 3353 3314 -39 0 0 3315 3315 4195 4147 -48 0 0 4148 4148 5345 5281 -64 0 0 5282 5282 226 223
12 TO 18 HRS.
49.99 3233 3195 -38 0 0 3197 3197 4120 4076 -44 0 0 4079 4079 5184 5134 -50 0 0 5137 5137 224 221
06TO 18 HRS.
50.00 3293 3254 -39 0 0 3256 3256 4158 4112 -46 0 0 4113 4113 5264 5207 -57 0 0 5210 5210 225 222
18 TO 24 HRS.
50.02 3098 3036 -62 0 0 3036 3036 3234 3171 -63 0 0 3171 3171 3171 3110 -60 0 0 3111 3111 230 227
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- November 2020
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Minutes of 76th OCCM of MP 56
ANNEXURE-5
System Disturbance / System Incidence
1. System Disturbance on 09.09.2020 at 220kv s/s Sukha: On dated 09.09.20 at 01.10hrs, MP system was normaland frequency of National Grid was 49.97 Hz. At 01.14hrs, B-ph PT of 220kv Main Bus- 2 burst at 220kv s/s Sukha, leading to the operation of Bus bar protection of Main bus 2, in whichfollowing elements tripped – 220KV Sukha- Jabalpur ckt-2, 220KV Sukha- Panagar ckt-2, 220KV Sukha- Narsinghpur ckt-2, 220KV Bus Tie 400/220 KV ICT -2 at Sukha(PG) There was no generation loss andno load loss. As per the report received, faulty element replaced by new one. Supply restoration started at 02.22Hrs andthereby remaining elements got normalized.
2. System Disturbance on 17.09.20at 220kv s/s Satna: On dated 17.09.20 at around 00.50hrs, MP system was normal and frequency of National Grid was 49.99 Hz . At 00.56hrs, B-ph CVT of 220kv Satna(PG)-Satna(MP)-2 burst at 220kv s/s Satna. In this event following elements tripped – 220kv Satna(PG)-Satna(MP) ckt-1, 220kv Satna(PG)-Satna(MP) ckt -2 220kv Satna(PG)-Satna(MP) ckt-3, 220kv Satna(PG)-Maiharckt 220kv Satna(MP)-Chattarpurckt, 220kv Satna(MP)- Kotarckt 132kv Satna-Maiharckt, 132kv Satna-Ucchehrackt There was no generation loss andload loss of around 529 MW .Interruption occurred at 220kv s/s Satna and nearby132kv s/s. 220kv Supply restored by charging220kv Satna(MP)- Kotarckt and 132kv Satna-Maiharcktand thereby remaining elements normalized. *********
Minutes of 76th OCCM of MP 57
Annexure‐6.9
MVA Date & Time
1 EAST DINDORI DINDORI 132 132KV 40 20+20 38.41 03/12/2020 18:55:00 96% 108 62 -2X Replacement 20-50MVA, Approved in REC-II in BOD , Estimate not sanctioned.
-
2 EAST SINGROULI DONGRITAL 132 132KV 20 1x20 18.34 06/12/2020 10:05:00 92% 9 0 -Replacement 20-50MVA, Approved in REC-II in BOD , Estimate not sanctioned.
-
3 CENTRAL SHIVPURI BAIRAD 132 132KV 40 1x40 39.50 15/11/2020 14:50:00 99% 81 3 - - -
4 WEST RATLAM BILPANK 132 132kV 40 1x40 35.91 13/11/2020 07:45:00 90% 7 0 - - -
5 CENTRAL RAJGARH B KHILCHIPUR 132 132KV 70 50+20 64.94 22/11/2020 10:45:00 93% 40 1 - - -
6 CENTRAL RAJGARH B KHUJNER 132 132KV 50 1x50 46.84 20/11/2020 13:10:00 94% 3 0 - - -
7 CENTRAL SHIVPURI MADA 132 132KV 50 1x50 46.18 10/11/2020 19:35:00 92% 23 1 - - -
8 CENTRAL RAJGARH B PACHORE 132 132KV 80 40+40 75.38 14/11/2020 13:10:00 94% 23 1 - - -
9 CENTRAL BHIND PRATAPPURA 132 132KV 40 1x40 38.06 11/11/2020 15:25:00 95% 14 0 - - -
10 EAST SIDHI SIDHI 132 132KV 60 40+20 59.31 16/11/2020 17:30:00 99% 51 21 - - -
11 EAST SEONI LAKHANADON 132 132KV 80 40+40 72.14 04/12/2020 16:20:00 90% 3 0 - - -
12 CENTRAL ASHOKNAGAR ASHOK NAGAR 220 132KV 120 40+40+40 109.49 06/12/2020 12:55:00 91% 11 0 - - -
13 CENTRAL GUNA GUNA 220 132KV 143 63+40+40 137.57 10/12/2020 12:15:00 96% 13 2 - - -
14 CENTRAL SHIVPURI 220KV SHIVPURI 220KV 320 290.08 290.08 17/12/2020 18:15:00 91% 10 0
15 EAST SAGAR RAHATGARH 132 132KV 40 1x40 36.82 05/12/2020 11:20:00 92% 5 0 - - -
16 CENTRAL GUNA KAPASI 132 132KV 50 1x50 46.00 30/10/2020 07:20:00 92% 1 0 - - -
Sub‐Stations, where more than 90% load recorded in Rabi Season 2020‐21 (Upto 17‐12‐20), but not approved
S.No. DISCOM District Name of Substation Tr.
Voltage Class
Installed CapacityMVA
November + December 20 Cumulative % Load Hours in Nov & Dec
20 Proposal Submitted
(vide A), MVA
REC-II(vide B), MVA
As per 106th BOD, 28.10.20Simultaneous Maximum % of
S.Max.Load
80% to 90% 90% to 100%
Minutes of 76th OCCM of MP 58
Meter Accuracy Acc. Acc. Reading M.F. Modem No
Cat Class Class Class Unit for MWH12345678
Note -Meter master updated on 30.09.2020
Annexure-8.6
S.No.
ENERGY METER Meter Sr. No.
Make Type
DETAILS OF ABT ENERGY METERS INSTALLED AT ..….THERMAL POWER STATION
LocationC.T.Ratio
SIM No. Particulars
C.T. Details P.T.RatioMeter Equipment Details
P.T.RatioDate ofComi. Ratio Ratio
Minutes of 76th OCCM of MP 59
PAGE-1
TIME
MF (FRACTION) MF (DECIMAL)NET ENERGY IMPORT (+) / EXPORT (-) [KWH)
IMPORT EXPORT IMPORT EXPORT IMPORT EXPORT IMPORT EXPORT KWH KWH IMPORT EXPORT
1 GENMAIN
CHECKMAIN
CHECK
2 BY UATsMAIN
CHECK ``MAIN
CHECK
3 BY STsMAIN
CHECKMAIN
CHECK
4 INTERFACE FEEDERS SENT OUTMAIN
CHECKMAIN
CHECK
Annexure-8.6
MONTHLY ABT METER READING DETAILS OF ………..THERMAL POWER STATION FOR THE MONTH OF …. 2020
DETAILS
DE
VIA
TIO
N C
HE
CK
M
ET
ER
METER CATEGORY
ENERGY METER NO.
AUX. CONSUMPTION BY STATION XMERS
NET ENERGYLAST MONTH'S READING
GENERATION UNIT NO.5
I
II
PRESENT METER READING
Thermal Power Station
I
24=00 HrsREADING DATE
AUX. CONSUMPTION BY UATs
II
I
III
I
II
SL NO.
11/30/2020ADJUSTMENT FOR
TESTING & CALIBRATION( IN MWh)
DIFFERENCE
Minutes of 76th OCCM of MP 60