LTE Cluster Optimization Report

LTE Cluster C08

2/4/2013

Mohammed Shashieh

2/12/2013

Cell Data and Cluster MapCluster No Total Planned Sites Sites integrated Sites on-airedCluster 08 8 5 5

eNodeB ID Site Name Cluster Cell ID TAC PCI

10026 LMU0026 LTE cluster C08 0 5 7510026 LMU0026 LTE cluster C08 1 5 7610026 LMU0026 LTE cluster C08 2 5 7710027 LMU0027 LTE cluster C08 0 5 7210027 LMU0027 LTE cluster C08 1 5 7310027 LMU0027 LTE cluster C08 2 5 7410037 LMU0037 LTE cluster C08 0 5 6610037 LMU0037 LTE cluster C08 1 5 6710037 LMU0037 LTE cluster C08 2 5 6810394 LMU0394 LTE cluster C08 0 5 7810394 LMU0394 LTE cluster C08 1 5 7910394 LMU0394 LTE cluster C08 2 5 8010731 LMU0731 LTE cluster C08 0 5 21910731 LMU0731 LTE cluster C08 1 5 22010731 LMU0731 LTE cluster C08 2 5 221

Cell Data and Cluster MapPercentage w.r.t total planned sites

62.50

DL EARFCN Bandwidth Azimuth Longitude Latitude Remark

1525 15M 60 23.629 58.501 commissioned1525 15M 180 23.629 58.501 commissioned1525 15M 300 23.629 58.501 commissioned1525 15M 80 23.6236 58.4927 commissioned1525 15M 160 23.6236 58.4927 commissioned1525 15M 300 23.6236 58.4927 commissioned1525 15M 60 23.6198 58.5023 commissioned1525 15M 180 23.6198 58.5023 commissioned1525 15M 300 23.6198 58.5023 commissioned1525 15M 60 23.6279 58.4865 commissioned1525 15M 180 23.6279 58.4865 commissioned1525 15M 320 23.6279 58.4865 commissioned1525 15M 60 23.63094 58.4935 commissioned1525 15M 180 23.63094 58.4935 commissioned1525 15M 300 23.63094 58.4935 commissioned

Drive Test Results - Distribution Graphs

Topic

Cluster PCI Distribution

Cluster DL RSRP Distribution

Cluster DL SINR Distribution

Cluster DL SINR Distribution

Drive Test Results - Distribution Graphs

Cluster Test Result

Quality Test

SINR

Sample Count %SINR => 17 30.3SINR= > 5 75.93SINR => -3 92.47

Throughput(SINR>0dB)

Max (aveg)36.963 96.773

Average (aveg)

LTE Inter RAT Redirection

0 IRAT Statistics:-Succea

No. Longitude Latitude1 58.131355 23.674022 58.131534 23.673943 58.130428 23.674744 58.131164 23.674225 58.125143 23.672326 58.125183 23.672467 58.128168 23.674578 58.12835 23.674599 58.146048 23.6585510 58.145595 23.6588911 58.141783 23.6365412 58.141706 23.6359413 58.16785 23.6547814 58.168189 23.6550215 58.157332 23.6671816 58.157044 23.6672917 58.139785 23.6790418 58.139785 23.6790719 58.130015 23.6777820 58.129817 23.6778321 58.104229 23.6822422 58.10428 23.6822323 58.119151 23.6493124 58.118983 23.6492425 58.114625 23.6365526 58.114572 23.636427 58.120279 23.6375428 58.120622 23.6375129 58.124323 23.6401830 58.124645 23.6400631 58.122315 23.6450532 58.122391 23.6450433 58.117056 23.6462734 58.116893 23.6463435 58.112164 23.645136 58.112318 23.6450337 58.110781 23.6451738 58.110742 23.6450939 58.105445 23.6581840 58.105254 23.6582541 58.100486 23.6570642 58.100488 23.6572143 58.10228 23.65433

Inter RAT Redirection Suc

44 58.10207 23.6544545 58.101878 23.6439546 58.1019 23.6434547 58.097281 23.6641848 58.09699 23.6642949 58.150081 23.6695850 58.150394 23.66944

LTE Inter RAT Redirection

IRAT Attempt:-

IRAT Success:-

LTE Inter RAT Redirection

Over Shoot Analysis

Events distributions

1

2

3

Issue Description and Analysis

1.Here the target area encouters a weak SINR and due to that it is jointion of several cell edges. 2 cells overshoots here, namely LMU0041A and LMU0230A. Need to down tilt down by 2 degrees and 4 degrees.And by launch, there will intergrate a new site LMU0004, which will improve the SINR.

2. Similar situation as abrove. And there is no domainate cell. LMU0394B needs tilting up from 8 degrees to 5 degrees.By launch, there is another new site LMU0393 at the marked place.

3.LMU0039A needs tilting down by 3 degrees and LMU0048C tilting down by 4 degrees.LMU0037 needs tilting up by 2 degrees.

3

4

5

6

3.LMU0039A needs tilting down by 3 degrees and LMU0048C tilting down by 4 degrees.LMU0037 needs tilting up by 2 degrees.

4.LMU0030A_PCI0 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

5.LMU0184A_PCI0 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

6.LMU0411A_PCI39 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

6

7

8

9

6.LMU0411A_PCI39 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

7.LMU0018A_PCI45 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

8.LMU0018B_PCI46 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

9.LMU0040A_PCI51 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

9

10

11

12

13

9.LMU0040A_PCI51 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

10.LMU0040A_PCI53 is overshooting all over cluster 08. suggested tilting down by 3 degrees.

11.LMU0029A_PCI54 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

12.LMU0029B_PCI55 is overshooting all over cluster 08. suggested tilting down by 3 degrees.

13.LMU0039A_PCI57 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

13

14

15

16

13.LMU0039A_PCI57 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

14.LMU0039C_PCI59 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

15.LMU0027C_PCI74 is overshooting all over nearby sites. suggested tilting down by 2 degrees.

16.LMU0026A_PCI75 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

16

17

18

19

16.LMU0026A_PCI75 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

17.LMU0026B_PCI76 is overshooting all over nearby sites. suggested tilting down by 4 degrees.

18.LMU0026C_PCI77 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

19.LMU0394A_PCI78 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

19

20

19.LMU0394A_PCI78 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

20.LMU0048C_PCI194 is overshooting all over nearby sites. suggested tilting down by 5 degrees.

Over Shoot Analysis

RemarkIssue Description and Analysis

Suggestions

1.Here the target area encouters a weak SINR and due to that it is jointion of several cell edges. 2 cells overshoots here, namely LMU0041A and LMU0230A. Need to down tilt down by 2 degrees and 4 degrees.And by launch, there will intergrate a new site LMU0004, which will improve the SINR.

as analysis

2. Similar situation as abrove. And there is no domainate cell. LMU0394B needs tilting up from 8 degrees to 5 degrees.By launch, there is another new site LMU0393 at the marked place.

as analysis

3.LMU0039A needs tilting down by 3 degrees and LMU0048C tilting down by 4 degrees.LMU0037 needs tilting up by 2 degrees.

as analysis

3.LMU0039A needs tilting down by 3 degrees and LMU0048C tilting down by 4 degrees.LMU0037 needs tilting up by 2 degrees.

as analysis

4.LMU0030A_PCI0 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

5.LMU0184A_PCI0 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

6.LMU0411A_PCI39 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

6.LMU0411A_PCI39 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

7.LMU0018A_PCI45 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

8.LMU0018B_PCI46 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

9.LMU0040A_PCI51 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

9.LMU0040A_PCI51 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

10.LMU0040A_PCI53 is overshooting all over cluster 08. suggested tilting down by 3 degrees.

as analysis

11.LMU0029A_PCI54 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

12.LMU0029B_PCI55 is overshooting all over cluster 08. suggested tilting down by 3 degrees.

as analysis

13.LMU0039A_PCI57 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

13.LMU0039A_PCI57 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

14.LMU0039C_PCI59 is overshooting all over cluster 08. suggested tilting down by 4 degrees.

as analysis

15.LMU0027C_PCI74 is overshooting all over nearby sites. suggested tilting down by 2 degrees.

as analysis

16.LMU0026A_PCI75 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

as analysis

16.LMU0026A_PCI75 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

as analysis

17.LMU0026B_PCI76 is overshooting all over nearby sites. suggested tilting down by 4 degrees.

as analysis

18.LMU0026C_PCI77 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

as analysis

19.LMU0394A_PCI78 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

as analysis

19.LMU0394A_PCI78 is overshooting all over nearby sites. suggested tilting down by 3 degrees.

as analysis

20.LMU0048C_PCI194 is overshooting all over nearby sites. suggested tilting down by 5 degrees.

as analysis

document.xlsx 文文文文

10/11/2022 文文文文文文,文文文文文文文文 文32文 文, 36文

Abnormal Events Analysis

No. Cata. Events distributions

Mobiltiy No Issue FoundAccessibilty No Issue FoundRetainability No Issue Found

document.xlsx 文文文文

10/11/2022 文文文文文文,文文文文文文文文 文33文 文, 36文

Abnormal Events Analysis

Issue Description and Analysis Suggestions Remark

document.xlsx 文文文文

10/11/2022 文文文文文文,文文文文文文文文 文34文 文, 36文

DriveTest KPIItem Target Value Optimization Result

Attach Failure Rate

Service Request Delay

E-RAB PS Drop Rate

Access RACH Latency

S1/X2 Handover Failure Rate

95.00% 100.00%

98.00% 100.00%

36.963mbps

RRC Connection Establishment Success Rate

Service Request Failure Rate

ERAB Establishment Success Rate

RLC ARQ/HARQ Retransmission Rate

S1/X2 Handover Interruption Time, intra-eNB(C-Plane)IRAT handover success rate

to 3G

Intra Frequency Handover Success Rate

C-Plane Latency Intra frequency HO

C-Plane Latency Intra frequency HO

IRAT handover success rate to 3G(If Availiable)DL Single User average

Throughput

document.xlsx 文文文文

10/11/2022 文文文文文文,文文文文文文文文 文35文 文, 36文

DriveTest KPIFormula

RRC Connection Establishment Success Rate = Number of RRC Connection Establishment Success / Number of RRC Connection Establishment

Attempt * 100%Attach failure Rate = 1- Number of LTE Attach Complete/ Number of

LTE Attach Request Service Request Failure Rate = 1-RRC setup success rate*ERAB setup

success rate(%)Service Request Delay = T(RRCRecfgComplete)-

T(RRCConnectionRequest);excluded the Service request failure delay*Exclude the unreasonable latency due to service request not

finished but reselect to other cellsERAB Establishment Success Rate = Number of ERAB Establishment

Success / Number of ERAB Establishment Attempt * 100%Call drop rate = Number of E-RAB Abnormal Release / Number of E-RAB

Setup Success * 100%DT Tool cannot measure this value as it is layer-2 measurement. But

this procedure included in idle to Active and Handover. Result evaluation: Average rudimental BLER recorded in Probe and

AssistantHandover Successful Rate = Number of Intra Freq Handover Success / (Number of Intra Freq Handover Success + Number of Intra Freq HO

Failure) * 100%;C-Plane Latency Intra frequency HO = T(handoff_complete)-

T(handoff_command)IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/ (LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail

Counter)*100%Handover Successful Rate = Number of Intra Freq Handover Success / (Number of Intra Freq Handover Success + Number of Intra Freq HO

Failure) * 100%;C-Plane Latency Intra frequency HO = T(handoff_complete)-

T(handoff_command)C-Plane Latency Intra frequency HO = T(handoff_complete)-

T(handoff_command)IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/ (LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail

Counter)*100%

EquipmentTest Equipment TypeLTE Terminal Huawei E392u-12

Data Collection Software Genex Probe V3.5Data Analysis Software Genex Assitant V3.5

Test SetupTest Type Long call