Integration of Material and BOM Maintenancein MDG, Central Governance

2PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

As a master data steward, I want to have a linked governance process while creating a material and its bill of material (BOM) in MDG.

Solution: There are different ways to support BOM creation when using MDG, according to these requirements:

1. SAP PLM and SAP Master Data Governance for Material

– Available as SAP consulting solution

2. Simple BOM in enhanced data model/process for MDG for Material

– How To Guide, How-To Guide for Side Panel, SAP Help Portal for Business Context Viewer (BCV)

3. Additional steps after activation in material change request (CR)

– SAP Note 2765664 and 2742813 starting from S/4HANA 1511 and MDG 8.0

4. Material change request triggers follow-up BOM change request

– How to Guide, available with SAP MDG, EAM extension by Utopia starting from S/4HANA 1909 SP01

5. BOM change request triggers change request for material

– SAP Help Portal for SAP MDG, EAM extension by Utopia, available with SAP MDG, EAM extension by Utopia starting from S/4HANA 1909 SP01

Solutions to Support Different RequirementsIn terms of function, scope, and governance process

3PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

SAP PLM allows customers to manage their product data along the entire product life cycle from

idea through portfolio management, engineering, release processes, and costing to handover to

manufacturing and service.

SAP MDG provides central governance of master data material, supplier, customer, financial and

custom domains.

For many customers looking for a complete solution in the product space, both solutions are

needed.

▪ SAP PLM orchestrates the processes of managing product data

▪ MDG provides detailed governance, control and data quality over the creation and update of data

material data used in transactional, analytical and reporting systems.

1. SAP PLM and SAP Master Data Governance for Material (1 of 2)

Joint Value Proposition

4PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

In this solution, PLM integration scenarios are enabled:

– PLM Engineering Record

▫ Create new material

▫ Change existing material

▫ Check status change request

– CAD Desktop

▫ Create new material

▫ Change existing material

It is available as SAP Consulting solution and the concept is reusable for integration into other objects.

1. SAP PLM and SAP Master Data Governance for Material (2 of 2)

Process Integration Scenarios

PLM Engineering Record MDG-M CR PLM Engineering Record

5PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

In this solution, the data model “MM” is extended. This is only recommended for simple BOMs.

▪ Option 1: Entity type 1 and own access class

▪ Option 2: Entity type 4 using BAdI MDG_BS_MAT_API_SEGMENTS_EXT (How To Guide)

In addition, the side panel can be used to show additional BOM information (for example: structure

and quantity information of the sales BOM, validity of BOM, display BOM) in Master Data Governance

for Material processes. More information can be found here: How-To Guide and SAP Help Portal for

Business Context Viewer (BCV).

2. Simple BOM in Enhanced Data Model/Process for MDG for Material

CR Basic Data CR Component List CR Activation… BOM Creation…

6PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

In this solution, additional steps after the activation step

are defined. In other words, the workflow no longer has

to end after a CR has been activated successfully.

Instead, after a CR has been activated, further actions

can be performed to trigger additional dialog workflow

steps. A workflow item for these additional steps can

then be found in the workflow inbox of the user who has

been assigned accordingly. In this additional step a link

to the BOM maintenance UI can be shown on the UI

and the user can maintain the BOM and confirm this in

the CR.

This is available starting from S/4HANA 1511 and from

MDG 8.0 with SAP Note 2765664 and 2742813.

3. Additional Steps After Activation in Material Change Request

CR Basic Data CR Link to BOM TransactionCR Activation… CR Final Step

7PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

SAP MDG, EAM extension by Utopia with S/4HANA 1909 SP01 can be used to request, approve, and execute changes for BOM objects as well as replicate those changes to decentralized systems.

In this solution scenario, the process starts in MDG for Material with a request for the creation of a material. The governance processes are being executed in MDG for Material until final activation of the material.

After activation, a follow-up change request is being created for the BOM of this material using SAP MDG, EAM extension by Utopia.

The governance process for the BOM continues in SAP MDG, EAM extension by Utopia until activation. This How to Guide describes the solution to automatically trigger a new material BOM change request after the activation of the material change request.

4. Material Change Request Triggers Follow-Up BOM Change Request

CR Material CR BOMCR Material Activation CR BOM Activation

8PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

SAP MDG, EAM extension by Utopia with S/4HANA 1909 SP01 can be used to request,

approve, and execute changes for BOM objects as well as replicate those changes to

decentralized systems.

In this solution scenario the process starts in SAP MDG, EAM extension by Utopia with a

change request for a new BOM. The user can request new components using a material

change request if the components don’t exist in active area.

The BOM change request can be activated only after all the dependent material change

requests are approved. The BOM change request activation process will trigger the activation

of dependent material change requests. All approved material change requests will get

activated first and then BOM change request will get activated.

5. BOM Change Request Triggers Change Request for Material

CR BOM CR Material(s) CR Material(s) Approval CR BOM ActivationCR Material(s) Activation

9PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ

BOM CR triggers CR for Material ->

available with SAP MDG, EAM extension by Utopia starting from S/4HANA

1909 SP01. SAP Help Portal for SAP MDG, EAM extension by Utopia.

Material CR triggers follow-up BOM CR ->

How to Guide, available with SAP MDG, EAM extension by Utopia starting

from S/4HANA 1909 SP01.

4./5. Integration of Material and BOM Governance Processes

Follow us:

Community: https://community.sap.com/topics/master-data-governance

Product: https://www.sap.com/products/master-data-governance/features.html

Roadmap: https://roadmaps.sap.com/board?PRODUCT=901B0ED1A0641EDA9FF75276E440C0EF&

SAP Help Portal MDG: https://help.sap.com/viewer/product/MASTER_DATA_GOVERNANCE/OVERVIEW/en-US

Thank you.

© 2021 SAP SE or an SAP aff iliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose w ithout the express permission of

SAP SE or an SAP aff iliate company.

The information contained herein may be changed w ithout prior notice. Some software products marketed by SAP SE and its

distributors contain proprietary software components of other software vendors. National product specif ications may vary.

These materials are provided by SAP SE or an SAP aff iliate company for informational purposes only, w ithout representation or

w arranty of any kind, and SAP or its aff iliated companies shall not be liable for errors or omissions w ith respect to the materials.

The only w arranties for SAP or SAP aff iliate company products and services are those that are set forth in the express warranty

statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional

w arranty.

In particular, SAP SE or its aff iliated companies have no obligation to pursue any course of business outlined in this document or

any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation,

and SAP SE’s or its aff iliated companies’ strategy and possible future developments, products, and/or platforms, directions, and

functionality are all subject to change and may be changed by SAP SE or its aff iliated companies at any time for any reason

w ithout notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forw ard-looking statements are subject to various risks and uncertainties that could cause actual results to differ

materially from expectations. Readers are cautioned not to place undue reliance on these forw ard-looking statements, and they

should not be relied upon in making purchasing decisions.

SAP and other SAP products and services mentioned herein as w ell as their respective logos are trademarks or registered

trademarks of SAP SE (or an SAP aff iliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies.

See www.sap.com/copyright for additional trademark information and notices.

www.sap.com/contactsap

Follow us