2PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
As a master data steward, I want to have a linked governance process while creating a material and its bill of material (BOM) in MDG.
Solution: There are different ways to support BOM creation when using MDG, according to these requirements:
1. SAP PLM and SAP Master Data Governance for Material
– Available as SAP consulting solution
2. Simple BOM in enhanced data model/process for MDG for Material
– How To Guide, How-To Guide for Side Panel, SAP Help Portal for Business Context Viewer (BCV)
3. Additional steps after activation in material change request (CR)
– SAP Note 2765664 and 2742813 starting from S/4HANA 1511 and MDG 8.0
4. Material change request triggers follow-up BOM change request
– How to Guide, available with SAP MDG, EAM extension by Utopia starting from S/4HANA 1909 SP01
5. BOM change request triggers change request for material
– SAP Help Portal for SAP MDG, EAM extension by Utopia, available with SAP MDG, EAM extension by Utopia starting from S/4HANA 1909 SP01
Solutions to Support Different RequirementsIn terms of function, scope, and governance process
3PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP PLM allows customers to manage their product data along the entire product life cycle from
idea through portfolio management, engineering, release processes, and costing to handover to
manufacturing and service.
SAP MDG provides central governance of master data material, supplier, customer, financial and
custom domains.
For many customers looking for a complete solution in the product space, both solutions are
needed.
▪ SAP PLM orchestrates the processes of managing product data
▪ MDG provides detailed governance, control and data quality over the creation and update of data
material data used in transactional, analytical and reporting systems.
1. SAP PLM and SAP Master Data Governance for Material (1 of 2)
Joint Value Proposition
4PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
In this solution, PLM integration scenarios are enabled:
– PLM Engineering Record
▫ Create new material
▫ Change existing material
▫ Check status change request
– CAD Desktop
▫ Create new material
▫ Change existing material
It is available as SAP Consulting solution and the concept is reusable for integration into other objects.
1. SAP PLM and SAP Master Data Governance for Material (2 of 2)
Process Integration Scenarios
PLM Engineering Record MDG-M CR PLM Engineering Record
5PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
In this solution, the data model “MM” is extended. This is only recommended for simple BOMs.
▪ Option 1: Entity type 1 and own access class
▪ Option 2: Entity type 4 using BAdI MDG_BS_MAT_API_SEGMENTS_EXT (How To Guide)
In addition, the side panel can be used to show additional BOM information (for example: structure
and quantity information of the sales BOM, validity of BOM, display BOM) in Master Data Governance
for Material processes. More information can be found here: How-To Guide and SAP Help Portal for
Business Context Viewer (BCV).
2. Simple BOM in Enhanced Data Model/Process for MDG for Material
CR Basic Data CR Component List CR Activation… BOM Creation…
6PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
In this solution, additional steps after the activation step
are defined. In other words, the workflow no longer has
to end after a CR has been activated successfully.
Instead, after a CR has been activated, further actions
can be performed to trigger additional dialog workflow
steps. A workflow item for these additional steps can
then be found in the workflow inbox of the user who has
been assigned accordingly. In this additional step a link
to the BOM maintenance UI can be shown on the UI
and the user can maintain the BOM and confirm this in
the CR.
This is available starting from S/4HANA 1511 and from
MDG 8.0 with SAP Note 2765664 and 2742813.
3. Additional Steps After Activation in Material Change Request
CR Basic Data CR Link to BOM TransactionCR Activation… CR Final Step
7PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP MDG, EAM extension by Utopia with S/4HANA 1909 SP01 can be used to request, approve, and execute changes for BOM objects as well as replicate those changes to decentralized systems.
In this solution scenario, the process starts in MDG for Material with a request for the creation of a material. The governance processes are being executed in MDG for Material until final activation of the material.
After activation, a follow-up change request is being created for the BOM of this material using SAP MDG, EAM extension by Utopia.
The governance process for the BOM continues in SAP MDG, EAM extension by Utopia until activation. This How to Guide describes the solution to automatically trigger a new material BOM change request after the activation of the material change request.
4. Material Change Request Triggers Follow-Up BOM Change Request
CR Material CR BOMCR Material Activation CR BOM Activation
8PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP MDG, EAM extension by Utopia with S/4HANA 1909 SP01 can be used to request,
approve, and execute changes for BOM objects as well as replicate those changes to
decentralized systems.
In this solution scenario the process starts in SAP MDG, EAM extension by Utopia with a
change request for a new BOM. The user can request new components using a material
change request if the components don’t exist in active area.
The BOM change request can be activated only after all the dependent material change
requests are approved. The BOM change request activation process will trigger the activation
of dependent material change requests. All approved material change requests will get
activated first and then BOM change request will get activated.
5. BOM Change Request Triggers Change Request for Material
CR BOM CR Material(s) CR Material(s) Approval CR BOM ActivationCR Material(s) Activation
9PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
BOM CR triggers CR for Material ->
available with SAP MDG, EAM extension by Utopia starting from S/4HANA
1909 SP01. SAP Help Portal for SAP MDG, EAM extension by Utopia.
Material CR triggers follow-up BOM CR ->
How to Guide, available with SAP MDG, EAM extension by Utopia starting
from S/4HANA 1909 SP01.
4./5. Integration of Material and BOM Governance Processes
Follow us:
Community: https://community.sap.com/topics/master-data-governance
Product: https://www.sap.com/products/master-data-governance/features.html
Roadmap: https://roadmaps.sap.com/board?PRODUCT=901B0ED1A0641EDA9FF75276E440C0EF&
SAP Help Portal MDG: https://help.sap.com/viewer/product/MASTER_DATA_GOVERNANCE/OVERVIEW/en-US
Thank you.
© 2021 SAP SE or an SAP aff iliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose w ithout the express permission of
SAP SE or an SAP aff iliate company.
The information contained herein may be changed w ithout prior notice. Some software products marketed by SAP SE and its
distributors contain proprietary software components of other software vendors. National product specif ications may vary.
These materials are provided by SAP SE or an SAP aff iliate company for informational purposes only, w ithout representation or
w arranty of any kind, and SAP or its aff iliated companies shall not be liable for errors or omissions w ith respect to the materials.
The only w arranties for SAP or SAP aff iliate company products and services are those that are set forth in the express warranty
statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional
w arranty.
In particular, SAP SE or its aff iliated companies have no obligation to pursue any course of business outlined in this document or
any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation,
and SAP SE’s or its aff iliated companies’ strategy and possible future developments, products, and/or platforms, directions, and
functionality are all subject to change and may be changed by SAP SE or its aff iliated companies at any time for any reason
w ithout notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forw ard-looking statements are subject to various risks and uncertainties that could cause actual results to differ
materially from expectations. Readers are cautioned not to place undue reliance on these forw ard-looking statements, and they
should not be relied upon in making purchasing decisions.
SAP and other SAP products and services mentioned herein as w ell as their respective logos are trademarks or registered
trademarks of SAP SE (or an SAP aff iliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies.
See www.sap.com/copyright for additional trademark information and notices.
www.sap.com/contactsap
Follow us