highways pfi outline business case (draft) - Isle of Wight Council
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of highways pfi outline business case (draft) - Isle of Wight Council
B - 25
Index
1. Executive Summary 1.1 Introduction 1.2 Background 1.3 Strategic Context 1.4 The Need 1.5 Scope 1.6 Benefits 1.7 Achieving Value for Money 1.8 Affordability 1.9 Programme Delivery 1.10 Member and Stakeholder Support 1.11 Conclusion 2. Strategic Case 2.1 Introduction 2.2 Pathfinder Project 2.3 Local Background 2.4 Strategic Policy Context 2.5 National Policy Context 2.6 Regional Policy Context 2.7 Local Community Strategy – Eco Island 2.8 The Isle of Wight Economic Strategy 2.9 Isle of Wight Council Corporate Plan – One Island 2.10 The Island Plan 2.11 Local Transport Plan 2006 – 2011 (LTP2) 2.12 Area of Outstanding Natural Beauty (AONB) Management Plan 2.13 Historic built environment 2.13.1 Public Realm 2.13.2 Archaeological Heritage 2.13.3 Natural Environment – Species and Habitats 2.13.4 Historic Environment Action Plan (HEAP) 2.14 Transport Asset Management Plan
B - 26
2.15 The Network 2.15.1 Asset Inventory, Condition and Survey Data 2.15.2 Road Pavement Condition 2.15.3 Street Lighting 2.15.4 Traffic Signals 2.15.5 CCTV 2.16 Current Service Delivery and Performance 2.16.1 Current Spending on Highways Services 2.17 Drivers for Change 2.17.1 The Service Gap 2.17.2 Carriageways 2.17.3 Footways 2.17.4 Bridges and Other Structures on the Highway Network 2.17.5 Street Lighting 2.17.6 Traffic Signals 2.17.7 CCTV 2.17.8 Drainage 2.17.9 Rural Rights of Way 2.17.10 On and Off Street Car Parking 2.17.11 Major Works – Bouldnor Road 2.18 Project Overview 2.19 Project Scope 2.19.1 Roads 2.19.2 Structures 2.19.3 Rural Rights of Way 2.19.4 Street Furniture 2.19.5 Footways and Footpaths 2.19.6 Traffic Signals 2.19.7 Street Lighting 2.19.8 CCTV 2.19.9 Grass Cutting and Street Cleansing 2.19.10 Floating Bridge 2.19.11 On and Off Street Car Parking
2.19.12 Bouldner Road Improvement 2.20 Standards of the Project 2.20.1 Core Investment Period 2.20.2 Post CIP
B - 27
2.21 Conclusion 3. Economic Case 3.1 Introduction 3.2 Options Appraisal 3.3 Service Improvements and Community Benefits
3.3.1 Time savings from higher traffic speeds as a result of better road conditions 3.3.2 Changes in travel times from changes in the volume of road works and road closures 3.3.3 Vehicle operating cost savings 3.3.4 Reduction in the number of accidents 3.3.5 Reduction in the Council’s public liability payments 3.3.6 Reduction in accidents and street crime as a result of improved street lighting 3.3.7 Time savings from the removal of weight and width restrictions 3.3.8 Efficiency gains from two sources – 1) the transfer from public to private sector management of the road network and 2) being able to undertake more effective maintenance measures because of the availability of more funds.
3.4 Value for Money Assessment (TQAT) 3.5 NATA 3.6 Assessment of Funding 3.7 Preferred Investment/Service Delivery Option 3.8 Conclusion 4. Commercial Case
4.1 Introduction 4.2 Procurement Appraisal for PFI
4.3 Procurement Process 4.4 Competitive Dialogue (CD) 4.4.1 Evaluation Criteria
4.5 Output Specification 4.5.1 Performance Requirements 4.6 Project Agreement 4.7 Payment Mechanism
B - 28
4.8 Derogations from SOPC4 4.9 Commercial Issues 4.9.1 Wharf Facilities 4.9.2 Isle of Wight Mineral Background 4.9.3 IWC Property Considerations 4.10 Market Soundings/Market Interest 4.11 Procurement Data
4.12 Encouragement of Competition 4.13 Bankability 4.14 TUPE 4.15 Summary 4.16 Conclusion 5. Financial Case 5.1 Introduction 5.2 Costs 5.2.1 Core Investment Period (CIP) 5.2.2 Lifecycle, Operations and Maintenance Costs 5.3 Shadow Bid Model 5.3.1 Shadow Bid Costs 5.4 PFI Credits and Calculation Methodology 5.4.1 Gapfunding 5.4.2 Revenue Abatement 5.4.3 Requirement 5.4.4 Sensitivities 5.5 Affordability 5.5.1 Budgetary Contribution 5.5.2 Cash flows from PFI Credits 5.5.3 Interest on cash balances 5.6 Preferred bidder debt funding competitions 5.7 Value for Money 5.7.1 Pre and Post Optimism Bias 5.7.2 Risk Transfer Costs 5.7.3 Qualitative Assessment 5.7.4 Quantitative Assessment 5.8 Initial View on Accounting Treatment
B - 29
6. Management Case 6.1 Introduction 6.2 Project Management and Project Governance Structure (Pre and Post OBC 6.2.1 Project Team Structure – to OBC 6.2.2 Project Team Structure – Post OBC 6.2.3 Contract Management Team – Post contract award 6.3 Expert External Advisors 6.4 Meetings 6.4.1 Internal 6.4.2 External 6.5 Project Delivery Plan and Timetable 6.6 Operational phase and contract monitoring 6.7 Project Interface and Dependencies 6.8 Stakeholder Consultations and Communications Strategy 6.8.1 Local Residents 6.8.2 Network users 6.8.3 All council staff 6.8.4 Statutory Undertakers 6.8.5 Local Suppliers 6.9 Sponsorship and Support 6.10 Risk Management 6.11 Data Management 6.12 Gateway Reviews/Independent Scrutiny 6.12.1 Gateway Reviews 6.12.2 Independent Scrutiny 6.13 Statutory processes 6.14 Readiness to Proceed to Procurement 6.15 Conclusion
B - 30
Appendix Number Appendix Name
1 Inventory and Condition Data 2 Technical Modelling Process 3 Core, Non‐Core and Retained Services 4 Traffic Modelling 5 Justification of CIP Duration 6 Non‐Financial Options Appraisal 7 Time Savings and Network Improvements 8 NATA 9 Estimated Costs of Required Work 10 OJEU 11 Key Aspects of the Output Specification 12 Derogations from SOPC4 13 PIN 14 Letters of Support from Soft Market Testing 15 A Basic Guide to TUPE 16 Admitted Body Status 17 Pension Rights 18 Monte Carlo Narrative 19 Qualitative and Quantities Assessment 20 TQAT 21 Letters of Support from External Advisors 22 Project Plan 23 Risk Management Strategy 24 Risk Register 25 Gateway Review Report
B - 32
1. Executive Summary 1.1 Introduction The Isle of Wight Council has developed a holistic approach to delivering the
Highways PFI, bringing in all aspects of highways services within the single
delivery PFI mechanism. The Highways PFI will upgrade the entire adopted
highway network between fence to fence and all associated assets and
streetscene and then maintain and operate throughout the life of the project.
The PFI project will raise the standard of the highway, offer a higher standard of
service, improving safety and enhance the street appearance.
1.2 Background The Department for Transport (DfT) selected the Isle of Wight Council (IWC) as
one of the three “pathfinder” Highways PFI Projects in March 2008. The Island’s
highway network has suffered from years of under investment and is badly in
need of significant investment to bring it to an acceptable standard. Without
such major investment, restrictions of the network will continue to grow to a
point that the highway network will not be operated in a safe manner. The
approval of the IWC’s Expression of Interest has therefore given the Council the
impetus needed to rehabilitate and operate a safe highway network.
1.3 Strategic Context The Council’s and its partner’s vision is to make the Island a world renowned
Eco Island with a thriving economy and a real sense of pride where residents
and visitors enjoy healthy lives, feel safe and are treated with respect. The
Island, despite being part of the more prosperous South East region suffers
from low productivity, low wages and low skill levels. We are determined to
improve the job opportunities and create a sustainable economy and it is
imperative that we address our failing transport infrastructure. The Highways
PFI has been developed to align itself with the national, regional and local
strategic objectives by placing sustainable development at the heart of Island’s
regeneration plans. The project, in addition to offering a higher standard of
highway services, will help to create a significant stimulus to the local economy,
offering an opportunity to regenerate parts of the Island and create highway
maintenance related industry on the Island. With an improved transport network
B - 33
and a lower wage based economy, the Island will also be better placed to
attract inward investment.
1.4 The Need The Island’s highway network has suffered from years of less than required
levels of investment. The condition of the roads, footways and street lighting
has reached a level where weight and width restrictions are now becoming a
regular feature. The Island’s roads condition has fallen to below the bottom
quartile of all the national highway condition indicators. The Island wide
customer survey indicates that the state of the roads is now the biggest concern
for the residents and visitors. The need to refurbish the Island’s highway
network is therefore overwhelming.
1.5 Scope The Council has adopted the “fence to fence” approach to defining the project in
order to achieve considerable synergies and efficiencies in the delivery of
highway related services. This approach also enables the Council to limit
contractual interfaces to the minimum to deliver a holistic service with single
point responsibility. The Highways PFI project will deliver the upgrading and
maintenance of the roads, bridges, retaining walls, footways, rural rights of
ways, street lighting, CCTV, traffic controls, on and off street car parking,
floating bridge, street furniture, grass cutting and street cleansing. The Council
has carried out soft market testing to ascertain the market appetite for the scope
and is pleased to receive considerable support for the approach being taken.
1.6 Benefits The Highways PFI project will upgrade the Island’s infrastructure and provide a
much improved highways service to Islanders and tourists alike. These direct
benefits will be derived from smoother carriageways and footways, better
lighting, better quality rights of ways for walking and riding and a more reliable
crossing between Cowes and East Cowes. The softer benefits of safer, clean,
well lit streets will have a major impact on building higher self esteem among
the local citizens and help to contribute towards shaping a community that is
proud to be part of a naturally beautiful island that has built a sustainable
economy around a major investment on its highways. The Council is working
with its local partners to develop the local industries to become ready to
become partners for delivering the works at sub contractor level; the Council is
B - 34
also developing its strategy to work with local schools, technical colleges and
universities to build the Island’s skills base to ensure there is enough capability
and capacity needed to support the Highways PFI over the 25 year period. This
Council believes developing the local industry and educational base can help to
regenerate the Island and retain a very high proportion of the PFI investment
within the Island, producing a multiplier growth effect for the local economy.
1.7 Achieving Value for Money The Council’s holistic approach to delivering highway related services will help
to achieve significant synergies and scale benefits. In addition, the Council will
be using carbon footprint to effectively manage the Island’s mineral resources
and use of energy; encourage the use of local labour; all of which will have a
significant impact on reducing the cost base. The Isle of Wight is determined to
produce a highway refurbishment solution that addresses some of the major
structural issues of the infrastructure but beyond that, it has taken a pragmatic
approach to raise the average condition by classification of road usage. At the
lowest level of usage, the level of upgrade is kept to a minimum to deliver a less
invasive treatment, while capitalising on adding strength to the surface.
The Council has demonstrated using the DfT’s New Approach to Appraisal
(NATA) that the project delivers sound economic benefit. In addition, there are a
number of non-quantifiable, qualitative benefits which have been captured in the
appraisal. The Council has developed a shadow bid model in line with the HM
Treasury methodology and compared it with the Public Sector Comparator to
demonstrate that this Project delivers value for money.
1.8 Affordability The Council has built up a robust inventory of all its assets and a
comprehensive database of its condition. Using this, it has built a Cost Model
which provided the basis for the PFI Shadow Bid Model. The Council has taken
the opportunity to model the current financial market uncertainty and taken the
worst market conditions at the beginning of this year to calculate the PFI Credit
requirements. On the basis of this conservative estimate, the Council is seeking
a PFI Credit of [£399.5million]. The Council has doubled its contribution from
previously allocated budgets to £11.15million per annum to deliver this Project.
B - 35
1.9 Programme Delivery The Council has put in place a robust governance structure, a dedicated
Programme Delivery team led by a very experienced Programme Director,
supported by in-house professional Engineers, Accountants and Lawyers to
bring together the necessary local highway background and experience.
Supporting the in-house team is a strong group of external advisors, who bring
a wealth of PFI experience. The Council has paid particular attention to building
a single “integrated project team”, setting up a dedicated office where advisors
and the Council officers work in a single team.
The Programme Director has developed a deliverable programme and a
procurement stage budget of £7.6million, which includes a contingency of
£0.5million, should the programme get extended due to external factors by up to
6 months. The Council has formally approved this programme and budget and
has made a strong commitment to making other shared corporate resources
available. The Council is increasing the full-time capacity of the in-house PFI
Team, post OBC submission to enter the procurement phase and has
developed the Contract Management structure post financial close. The post-
OBC structure will provide the foundation for building capability for the longer
term Contract Management team. Those who are involved in the competitive
dialogue phase will gain considerable insight into contract negotiations and the
final contractual terms agreed with the Service Provider.
The Council has built an excellent inventory and condition database and this will
be made available as part of the data room to bidders. This information will also
be available in GIS format and a video of the network. The Council now has a
very high degree of confidence in its data. The condition assessment will now
be repeated annually to maintain the robustness of the data.
With the combination of a strong governance framework, adequate resourcing,
experienced project leadership, deliverable time scales and an excellent asset
base, the Council now has all ingredients for successful Project delivery.
Moreover, it has a very high degree of confidence in delivering a Project with an
appropriate commercial package suitable for the Isle of Wight conditions.
B - 36
1.10 Member and Stakeholder Support The Highways PFI Project has strong all party support. The Project was initially
developed under Island First (a Liberal Democratic/Independent administration)
and has continued to progress under the Conservative administration. The
Project plays a vital role in supporting all party aims of creating sustainable
employment on the Island.
[Members have approved the scope (to be submitted to Cabinet on 11 August)]
of the Project, the procurement strategy, resources and the delivery timescales.
The Members have delegated appropriate authority to the Project Board and
the Project Sponsor to make all procurement decisions following the approval of
the OBC until the Preferred Bidder selection and appointment.
The Project has wide support among the Island’s stakeholders; the businesses,
community groups and partners are aware of the significant social, economic
and regeneration benefits the Project will bring to the Island. The council staff
who are likely to be affected by the Project are regularly briefed and the
Highway PFI Project intranet site provides the regular updates.
1.11 Conclusion The Council values and protects the pathfinder status it gained following the
successful submission of the Expression of Interest. It has now developed the
Project taking a practical and pragmatic approach to developing an attractive
but challenging package for the market, in a sensible timescale backed up by a
strong delivery team. The ethos of this team is “partnership working” and that
spirit will continue, even through the dialogue period with the ultimate aim of
delivering a “win-win” approach to this Project. The Council is now ready to
embark on the procurement stage of the Project, following approval of this
Outline Business Case.
B - 37
2. Strategic Case 2.1 Introduction The Isle of Wight Council and its strategic partners have grasped the
opportunity to address some of the major challenges that are fundamental for
the regeneration of the Island. The Council is leading the way by implementing
both challenging internal reform and modernisation, and external service
reforms in the education and highways maintenance sectors. These reforms
are driven by the Island’s strategy, the Eco Island Vision 2008-2020, for a
sustainable community that thrives amidst the natural beauty and surroundings.
The Highways PFI forms an integral part of the strategic reform to increase the
capability and capacity of the Island and improve its attractiveness for inward
investment. The Highways PFI is seen as the significant catalyst not just for
improving the condition of the highway network, but also to create a road
construction and maintenance industry and its supply chain, using local natural
and physical resources. The Council and its Strategic Partners are working
towards an economic regeneration programme, underpinned by the Eco Island
vision, to derive significant economic benefits, for example through a multiplier
effect from the Highways PFI investment over the 25 year life of the project.
External Drivers for change stem from National, Regional and Local Policy.
These in turn relate to National Planning Policy Guidance, the special policies in
the South East Plan relating to the Isle of Wight, which underpins the Isle of
Wight Community Strategy, the Isle of Wight Economic Strategy, and AONB
Management Plan formulated and agreed with local partner organisations.
Within this context Internal Drivers are identified from the strategies and policies
developed by and within the Isle of Wight Council, including the Isle of Wight
Development Plan and Local Transport Plan.
The Council has a clear vision for the Highways PFI which is:
B - 38
To create an efficient highway network and public realm, providing
sustainable, high quality, value for money service to residents and
visitors, whilst acting as a catalyst for social and economic regeneration
of the Island.
Based on this vision, the Council has set the following Project Objectives:
• To ensure the provision of a high standard, fit for purpose highway
network to meet the needs and aspirations of residents, business and
visitors for the movement of goods and people.
• To promote sustainable transport options and initiatives by ensuring
the availability and maintenance of the whole physical highway and
rights of way asset and appropriate traffic management.
• To provide a comprehensive and seamless service for all parts of the
highway, fence to fence, both in built up areas and the countryside
with appropriate standards and use of materials to reflect local
distinctiveness and character.
• To create a safe highway environment within the context of a well
managed public realm/whole street scene
• To create a highway maintenance industry that act as a stimulus for
the economy.
The Project will be developed to deliver these objectives by designing an
appropriate contract structure defining the project which can be achieved within
the affordability envelope.
The Isle of Wight Highways PFI is a unique Project. In an Island context,
surrounded by water, there are no overlapping local authority boundaries with
neighbours or trunk road network that come under Highways Agency
responsibility. The highway boundaries, ownership and responsibilities are
therefore clearer in comparison to any other local authority on the mainland. As
one of the three pathfinder schemes, it is also well placed to provide valuable
knowledge, direction and lessons for future tranches of maintenance PFI
programmes. In particular, the Council intends to explore new opportunities,
innovative approaches, and future proofing to introduce advances in technology
B - 39
during the life of the PFI. It also intends to build a locally based highway
industry with its partners in the education sector, industry and the PFI provider.
2.2 Pathfinder Project In technical terms, the highways on the Island are largely rural in nature, in an
area of outstanding natural beauty, with pockets of urban roads surrounding the
local towns. The pathfinder approach taken by the Council will provide a
number of opportunities to learn lessons for the future and share knowledge for
the benefit of the highway industry:
• The Council has built up a complete list of its highways inventory and
condition. Using this data, it is building a Condition Index using certain key
parameters. The Council is keen to reflect the island conditions in its
deterioration model and to ensure an affordable specification. Similarly it will
develop skid resistance policy and a road condition model. Standards
appropriate to the island needs will also be appropriate to rural and semi rural
communities elsewhere in the UK.
• The Council will develop an output specification for rural rights of ways and
this is likely to become a base document in future projects.
• The Council will record progress and key issues faced at each of the key
stages and to share solutions developed with DfT and the other pathfinder
authorities.
• The Council is setting in place the foundation for a collaborative framework
with schools, technical colleagues, local universities and other educational
institutions to build the technical capability and capacity needed to create an
Island based Highways Maintenance Industry. The Island is in a unique
position to use the investment on the roads over the 25 years project period
to regenerate the local economy through planned, strategic investment in the
educational sector.
• The Council intends to seek proposals from bidders for setting up training and
apprenticeship schemes in association with the educational sector.
• The Council aims to create an economic regeneration climate that delivers
visible improvements across the Island and for Islanders and which acts as
the trigger for major regeneration. The economic regeneration benefit of
investment in transport projects is usually very difficult to measure, but the
B - 40
Island context offers an ideal contained market place to measure investment
and economic growth.
• The Council is keen to work with other local authorities, universities, research
organisations and international highway authorities to share the benefits of
the experience for the PFI model maintenance procurement.
2.3 Local Background The Isle of Wight, a diamond shaped island, separated from the UK mainland
by the sinking of the Ancient River Solent during the Bronze Age to become an
Island in its own right. The Island, separated from the south coast by the Solent,
measures approximately 13 miles by 23 miles along its diagonals and covers an
area of 38,014 hectares.
The Island has a rich history dating back to the Duke of Warwick, the first King
of the Isle of Wight, to Charles the 1st being held as a prisoner in Carisbrooke
Castle, and Queen Victoria’s favourite home Osborne House, which still stands
proud on the Island. In 2009 however, the Island is now part of the England and
Wales Local Authority system and has Unitary Authority status.
The Island has a unique and important natural environment, which is protected
by national and local designation. A majority of the Island is rural in character
with isolated farms, hamlets and villages and with over half the area designated
as Areas of Outstanding Natural Beauty, (AONB). Much of the coastline is
defined Heritage Coast and the majority of the coast and some inland areas are
designated for European and/or International nature conservation of wildlife
species and habitats. There is a cluster of five areas designated as the Isle of
Wight AONB, 41 Sites of Special Scientific Interest (SSSI), 28 existing and 4
proposed Conservation areas and 34 kms of heritage coast. The Island has
over 2000 listed buildings of which 28 are Grade 1, including the historic
Osborne House and Carisbrooke Castle.
Travel to and from the Island is via privately operated and un-subsidised vehicle
and passenger ferry services. The vehicle ferry routes are between Lymington
and Yarmouth in the West, Southampton and East Cowes centrally and
Portsmouth and Fishbourne in the East, creating pulses of traffic generation
onto the highway network. High speed passenger boat services are from
B - 41
Southampton to Cowes, Portsmouth to Ryde and a hovercraft service runs from
Southsea to Ryde.
The main settlements are around the centrally located county town of Newport
with a primarily radial road network linking the other main settlement areas such
as Cowes, East Cowes, Ryde, Sandown, Shanklin and Ventnor, distributed
around the coast. There is a coastal road system, linked by the Floating Bridge
at Cowes, encircling the Island which is valued by tourists and Islanders alike.
The Island has an integrated public bus network, but services are not available
in some rural areas. Island Line, part of the Stagecoach South Western Trains
franchise, operate the eight and a half mile of passenger railway serving the
towns of Ryde, Brading, Sandown, Lake and Shanklin. A leisure steam railway
operates between Wootton and Smallbrook.
In the absence of a comprehensive public transport network, the largely rural
community relies heavily on private transport. The 2001 census data showed
that compared to England and Wales, the Islanders have slightly higher car
ownership; some 64,000 cars/vans were recorded in the census, some 0.49
cars/vans per person or 67 per km. In addition, there is the daily influx of
passenger and heavy goods traffic, to meet the day to day needs of the
Islanders.
The Island’s 803 km of road network has become the lifeline for the Islanders,
playing a vital role in the social, commercial and recreational life of the
community. However, the conditions of the roads have deteriorated over the
B - 42
years and many roads are no longer fit for the purpose. Currently seven roads
have weight restrictions whilst a large number have width restrictions. The
failing road network is considered to be one of the key factors contributing to a
slow down in the economic regeneration of the Island.
The 2001 census recorded an Island population of 132,000. The Island’s
population distribution is skewed towards the elderly in comparison to national
averages; over 28% of the population were aged 60 years or over, compared
with around 20% for England and Wales; at the other end of the scale, those
aged 16 years and under were significantly lower at around 18%. The skewed
age distribution reduces the available pool of economically active citizens,
impacting the economy of the Island.
The public sector is one of major employers in the Island – namely, the Isle of
Wight Council, NHS, the Prison Service and the Police. The Island also
supports a number of specialist niche industries – wind turbine research and
development, Radar electronics/communications, yacht/boat building,
composite and resins, pollution control equipment, Royal National Lifeboat
Institution inshore lifeboats, cosmetics and fashion.
The Island’s economy is heavily dependent on the tourist industry and during
the summer months the Island’s population can double, with total numbers of
visitors reaching about 2.7 million each year. This can lead to traffic volumes
doubling during the summer month. The majority of the world’s leading
yachtsmen and women descend on the Island during Cowes week. The Island’s
Music Festivals and Walk the Wight are now nationally famous events attracting
many thousands from far a field. The Island is a paradise for walkers, cyclist
and horse riders. It has over 850km of Rural Rights of Ways traversing through
some of most beautiful parts of the Island.
B - 43
Whilst the Island sits geographically within the south-east of England it does not
benefit fully from the regions prosperity. The Island has pockets of deprivation
and five wards fall within the 20% most deprived areas in England. The rate of
unemployment has continued to reduce from the historical highs of 10% in the
mid 90’s to currently nearer 4% but much of the employment is seasonal, with
high dependency on the tourist industry. Recent economic changes have further
affected locally based industries causing an increase in the claimant count. The
Island has the second lowest average wage in the UK.
The image of an Island full of natural outstanding beauty, buzzing with an influx
of tourists in the summer, sits in stark contrast with the huge need for economic
regeneration, better employment opportunities, and improved standards of
living.
Isle of Wight Council works closely with the the South East Economic
Development Agency and stakeholders to support and develop the Island’s
economy through regeneration programmes, business critical infrastructure and
targeted business support. In recent years, the Island economy has grown
faster in both employment and GVA measures than the South East and UK
averages. The Island's economy is well placed to continue to grow, particularly
drawing on its environmental assets and strengths in growth sectors such as
renewables, aerospace, composites, tourism and marine related industry and
quality infrastructure/well maintained roads are critical to supporting this.
B - 44
2.4 Strategic Policy Context The Council’s vision of making the Island a great place to live, work and visit is
being achieved through an integrated series of underlying strategies and
policies consistent with regional and national policies. In this context, the
Highways Project has been developed in line with National and Regional
Strategies and driven by local strategy and polices as shown in the following
diagram.
National Policies
Transport
Economy
Planning
Regional Policies
South East Plan
Regional Economic Strategy
Local Policies
Eco Island
Island Plan
Economic Plan
Corporate Plan
IWC Highways PFISustainable Development, Economic Growth, Enhanced Social and Environmental Benefits
2.5 National Policy Context The Chancellor of the Exchequer, in his pre-budget statement in November
2008 set out the Government’s long-term economic goal - to secure and
maintain economic stability, in order to achieve its objective of a fair society
where there is security and opportunity for all. Its aim is to raise the rate of
sustainable growth, and achieve rising long term prosperity and a better quality
of life with economic and employment opportunities for all.
The 2004 Government White Paper “The Future of Transport, a network for
2030” sets out the Government’s vision for transport up to 2030. It recognises
the need for a transport network that can meet the challenges of a growing
economy and the increasing demand for travel, but a network that also achieves
environmental objectives. This strategy is built around three key pillars –
sustained investment, improvement in transport management, and planning
B - 45
ahead. This means coherent transport networks providing a more reliable and
free-flowing service for both personal travel and freight.
The Government’s Climate Change Bill introduces a legally binding target to cut
greenhouse gas emissions by at least 80 per cent by 2050, the most ambitious
in the G8, building on plans to deliver a one-third reduction in emissions from
1990 levels by 2020.
Against this back drop of the need for long term economic stability, supporting
increasing demand for travel whilst continuing to reduce greenhouse gas
emission, the Department of Transport announced a Highway Maintenance
Pathfinder Programme.
The Government ten-year Plan, Transport 2010, sets out the Strategy for
modernising the transport network nationally. The Plan sets several strategic
objectives including the elimination of the maintenance backlog on local roads,
bridges and street lighting. In addition, the July 2004 White Paper, The Future
of Transport - a network for 2030, reinforces the strategic importance of the
transport network in promoting sustainable, national and local economic growth
and in enhancing social and environmental well-being.
2.6 Regional Policy Context The South East is a major gateway to Europe and beyond and is the most
prosperous region in England. Even though the Island is part of the South East
Region, it does not share proportionately in the wealth of the Region. However,
the Island has a rich history of innovators and entrepreneurs who have made
valuable contributions to the South Eastern and the national economy.
However, sustaining inward private investment relies heavily on appropriate
regional and national strategies to support transport and other infrastructure
development.
The Regional Spatial Strategy (RSS) for the South East of England, known as
the South East Plan, published in May 2009, sets out the long term spatial
planning framework for the region over the next 20 years. The Plan is to
develop a healthier region by achieving more sustainable development,
protecting the environment and combating climate change.
B - 46
A healthier region means working to improve, among others things, the
provision of community transport facilities, sustainable transport links, a feeling
of security and an approach to a sharing the benefits of regeneration. The
South East Plan will deliver these through local policies which, in the case of
Isle of Wight, will focus on maintaining a high quality of life whilst increasing
prosperity and opportunities for the Islanders, at the same time nurturing and
enhancing the environmental assets, and promoting the efficient use of
resources.
The Regional vision is “By 2016 the South East will be a world class region
achieving sustainable prosperity.” The Region faces increasing challenges from:
• Globalisation – increasing competition but an opportunity to build on past
entrepreneurial culture,
• Smarter growth – higher levels of prosperity per head without increasing
ecological footprint,
• Sustainable Prosperity – innovating to provide economic prosperity within
environmental limits.
Investment in the Isle of Wight’s Highways PFI is aimed at strengthening the
highways network and transport across the Island to enhance its attractiveness
as a place for investment, thereby contributing to the success of the Region and
the Island. The Island has a relatively low cost base and an eco friendly
business environment which, with the support of SEEDA, is being revitalised
through economic regeneration. The Highways PFI is the key strand that runs
through this regionally supported regeneration and development.
2.7 Local Community Strategy - Eco Island The Island’s local strategic partnership is known as the Island Strategic
Partnership (ISP); the ISP is made up of leading organisations in the Island
including the Isle of Wight Council, the Health Authority, the Police, Voluntary
and Community Organisations, IW College, the Chamber of Commerce,
Business Community and Government Departments. The Community Strategy
“Eco Island” sets the vision for the next decade by aiming:
B - 47
“to be a world renowned Eco Island, with a thriving economy and a real
sense of pride, where residents and visitors enjoy healthy lives, feel safe
and are treated with respect”
The four main themes that underpin the strategic vision are:
• Thriving Island,
• Healthy and Supportive Island,
• Safe and Well-kept Island,
• Inspiring Island.
This Island Vision is being delivered through a series of prioritised policy
initiatives and the Highways PFI is one of the vital delivery mechanisms for
achieving this vision.
Through this vision the ISP is committed to protecting and enhancing the
Island’s natural beauty; creating wealth and reducing carbon footprint;
supporting economic development and regeneration; reducing crime and fear of
crime; and enhancing how our local area ‘looks’ and ‘feels’. The Highways PFI
is being developed to support each of these areas and is the cornerstone for the
final project options presented in this OBC. The ISP is now committed to
deliver, by 2020, the lowest carbon footprint in England and renewal of
infrastructure to the highest ecological standards.
2.8 The Isle of Wight Economic Strategy The Isle of Wight Economic Strategy supports ‘Investing in success to produce
a more mixed economy, creating opportunities for increased inward investment
and sustainable prosperity by prioritising quality of life.’ The strategy cites the
road infrastructure on the Island as one of the key weaknesses for attracting
inward investment and the Highways PFI is seen as vital to both cementing and
reinvigorating a fragmented highway maintenance industry on the island and
providing an attractive and fit for purpose road infrastructure.
B - 48
2.9 Isle of Wight Council Corporate Plan - One Island
The IWC Corporate Plan, known as “One Island,” provides the vehicle for
delivering the Eco Island through a number delivery strands.
Whilst focusing on the external delivery, the Council also has an internal
modernisation programme, known as “One Council”, equipping the Council with
the appropriate infrastructure, capacity and capability which is fundamental to
delivering the much wider vision.
The Highways PFI is an integral part of that transformation vision; the Council
has taken a strategic decision to bring in an experienced Programme Director
and build a team around him using the Council’s own internal staff and
experienced expert advisors to gain maximum skill transfer. The Highways PFI
programme is also setting the standards for all projects and programmes in the
Council and a Governance and scrutiny framework appropriate for major
complex projects is now in place. The Highways PFI also forms the cornerstone
of the Council’s contributions towards creating a sustainable, thriving economy
for the Island. Plans are already under development to engage with schools at
all levels to create interest in civil engineering and allied highway maintenance
industries, to set up technical study programmes and apprenticeship as part of
the PFI, and to build technical capability and a highway maintenance industry
on the Island. In addition, the Council, along with its strategic partners, are
working with the local industries, both those directly connected with highways
and the remaining supply chain to provide them with the best possible
opportunity to prepare for and engage with a future PFI provider. This has the
potential to reduce the cost for the future PFI provider and hence the cost of the
PFI for the public purse whilst creating the impetus needed to pump-prime the
Islands economy.
The Council, along with its strategic partners, is setting the key educational and
employment plans in place and will be working with educational institutions to
make this a reality over the next four years and to sustain engagement
throughout the 25 year project period. The aim is to create economic benefit
and legacy that will outlast the PFI programme and create wealth for the
Islanders and therefore the nation, significantly higher than the direct
investment made in the Island’s highways.
B - 49
The framework below shows the strategic link between the Eco Island Strategy,
One Island Plan and the Highways PFI programme.
2.10 The Island Plan The Local Development Plan, the Island Plan, is in the final stages of the
statutory approval process, but its Core Strategy is used to set the planning
vision for the Island through to 2026. Building and creating sustainable
communities is central to the Sustainable Community Strategy that is focused
on delivering the Eco Island vision.
Eco Islandthemes
A thrivingIsland
1 Protect and enhance our Island’s natural beauty.2 Create wealth and reduce our carbonfootprint at the same time.3 Produce as much of our energy aspossible from renewable sources.4 Support economic development andregeneration, enabling all to be able toshare in the Island’s economic success, through increasing the skills of the whole community.
Modernisingthe council
OneCouncil
An inspiringIsland
A safe andwell-kept
Island
A healthyand
supportiveIsland
9 Reduce crime and substance misuse.10 Reduce anti-social behaviour anddisorder.11 Reduce the fear of crime and increase public confidence.12 Enhance how our local areas look and feel, now and in the future.
1 Protect and enhance our Island’s natural beauty.2 Create wealth and reduce our carbon footprint at the same time.
4 Support economic development and regeneration, enabling all to be able to share in the Island’s economic success, through increasing the skills of the whole community.
16 Putting the customer first.17 Supporting staff.18 Improving performance and value for money.19 Reducing the council’s impact on the environment.20 Making our buildings fit for purpose.21 Improving our reputation with residents, visitors and local businesses.22 Establish, maintain and improveeffective partnership engagement.23 Organisational development and improvement.
13 Make sure our children achieve better than the national average at school and college.14 Reduce childhood inequalities, bytackling poverty, neglect and domesticviolence.15 Support families and carers to provide a safe and positive environment for our young people.
5 Reduce levels of obesity in all ages.6 Improve health, emotional wellbeingand life expectancy across the Island.7 Support vulnerable people to liveindependent lives.8 Ensure people of all ages have places to live and things to do in their local area.
16 Putting the customer first.17 Supporting staff.18 Improving performance and value for money.19 Reducing the council’s impact on the environment.
21 Improving our reputation with residents, visitors and local businesses.
23 Organisational development and improvement.
9 Reduce crime and substance misuse.10 Reduce anti-social behaviour anddisorder.11 Reduce the fear of crime and increase public confidence.12 Enhance how our local areas look and feel, now and in the future.
6 Improve health, emotional wellbeing and life expectancy across the Island.
Corporate Themes Corporate Priorities Highways PFI
B - 50
The Island sustainable travel plan supports a multi-modal transport strategy.
This relies on the highway network for public and private transport, whilst the
rural rights of way network provides the vital links for walking, cycling and riding;
the combination of the two provides a highly integrated interlinked transport
network across the Island. The public therefore rely on a good transport network
for people and goods to travel from wherever they are to destinations of their
choice, both on and off the Island, with safety, reliability, ease of access, and at
a convenient time. The Island is a renowned destination for walking and cycling,
not only through celebrated annual events, but as a real means to getting
around, delivering a healthy Island both in terms of benefits to the population
and the environment.
The strategy aims to achieve improved transport infrastructure, travel plans and
improved public transport provision and an increase in opportunities for walking
and cycling. The aim is to offer people more choice about the ways in which
they travel, whilst seeking not to penalise those for whom the car is the only
realistic solution.
Car ownership on the Island continues to remain relatively high, due in the main
to the rural nature of the Island, which places additional reliance on the car for
certain types of journey. However, during the summer season the traffic on the
Island, changes significantly with the influx of tourist traffic.
The ferry ports, both passenger and vehicle services, are important gateways to
the Island. The numbers crossing the Solent for business or pleasure have
increased steadily over time and this increase in cross-Solent traffic, coupled
with increased car ownership and use, has further added to the transport
challenges the Island faces.
A number of new and improved park and ride facilities are being promoted to
reduce congestion. Whilst the improvement, maintenance and management of
the highway network alone cannot deliver all of the aspirations set out in the
strategy, improved road and rights of way networks will make a significant
contribution to delivering the strategy. The PFI Project will provide a focused
and comprehensive means of injecting much needed resources to overcome
past backlog maintenance and, once appropriate standards have been met,
maintaining these over the longer term. As such, a high quality, fit for purpose
B - 51
highway network should become a consistent, reliable and integrated part of the
Island’s infrastructure to support implementation or other strategies and
policies.
2.11 Local Transport Plan 2006-2011 (LTP2)
The Local Transport Plan sets the policy framework for determining the
transport needs of the Island, and brings together the transport policies and
strategies in a cohesive manner. The statutory Isle of Wight Local Transport
Plan was adopted in March 2006 and sets out how transport will be improved
on the Island over the period 2006 -2011. The Plan was approved by the DfT
and developed through extensive consultation to achieve the following
objectives:
• To increase accessibility for all.
• To encourage and support economic prosperity and regeneration.
• To make Island roads safer.
• To improve local air quality and conserve and enhance the
environment.
• To tackle congestion.
• To ensure effective management of the highway network.
• To achieve value for money solutions.
The LTP supported the development of the PFI bid and acknowledged the key
role that the initiative would have in delivering the plan and in particular the road
maintenance and road safety targets set out in the Plan. The PFI will clearly be
instrumental in delivering a large part of the LTP strategy which is set out below
• The plan seeks to promote alternatives to the car and reduce
congestion and pollution
• Increased numbers of people will walk or cycle using improved
cycleways, urban paths and pavements.
• The Plan seeks to reduce traffic accidents through a range of
engineering solutions and hearts and minds initiatives.
• The road infrastructure on the Island will be maintained to good
standards, and will assist the public transport network using it.
B - 52
• Provide investment in a safe, well maintained road system, including a
network for buses, lorries and coaches, through for example the private
finance.
The 2006 LTP set a series of ambitious targets for achieving high quality
highways by 2010 - to have no overall deterioration in condition of the principal
road network and the unclassified road network, footway condition and reduce
death and injury on roads. Although 2010 is now recognised as an
unachievable date, the target standards will be achieved on completion of the
PFI project core investment period.
The LTP incorporates a Rights of Way Improvement Plan, the primary aim of
which is to ensure the most effective use of the rights of way network. The Plan
recognises the significant contribution that the Island’s 837 km of non-vehicular
highways make to sustainable transport on the Island. It also seeks to ensure
that the rights of way network continues to be managed as an important
component of the overall highway network. The Rights of Way Improvement
Plan is wholly concerned with improving facilities for walking and cycling of all
kinds away from road traffic and will therefore assist in delivering the quality of
life objectives of the LTP. Thus the PFI project allows achievement of strategies
which will improve quality of life through improving transport choices for
Islanders and visitors alike.
Whilst the current LTP2 does not cover the whole period of the PFI contract, the
5 year renewable plan will continue to build the Eco Island theme, consistent
with the Highways PFI.
Revised LTP guidance is expected in the summer of 2009 and whilst there may
be some changes from the original draft it is anticipated that the final guidance
will still require local authorities to produce a two part plan, including the overall
strategy and detailed delivery programme.
The draft guidance indicates that the plan should take account of the following
five key goals:
• Tackle climate change.
B - 53
• Support economic growth.
• Promote equality and diversity.
• Contribute to better safer, security and health.
• Improve quality of life.
The PFI Project will support these goals and will be a fundamental part of the
delivery programme.
2.12 Area of Outstanding Natural Beauty (AONB) Management Plan The Island has a unique and important natural environment, which is protected
by national and local designations covering both landscape and ecology to help
protect the character of the Island. The Isle of Wight AONB Partnership is a
broad based Independent organisation with representatives from many local,
regional and national organisations and individuals with a direct interest in the
AONB. It seeks to ensure a co-ordinated approach to the conservation and
enhancement of the AONB.
The rights of way network, and to some extent the minor and unclassified road
network, are often key features in the AONB landscape. Coastal roads, highway
verges and hedgerows that form the boundary define the contours of the
undulating landscape; the unclassified roads contain a number of historic signs
which form the rural character; lighting in rural areas is managed
sympathetically to prevent light pollution. The treatment of the rural rights of
ways and the coastal roads in particular will play a crucial part in preserving the
natural landscape and ecology. The management of the natural environment is
therefore an integral part of highway management. Both the investment
programme and the services of the PFI Project will need to be sensitive to areas
of outstanding natural beauty and the natural environment through carefully
designed output specification requirements.
The aims and objectives of the IWC Highways PFI programme are consistent
with the national economic, transport and environmental policies, enabling
these to be delivered at local level, in order to achieve the nationally set
objectives. The Isle of Wight Council Highways PFI is one of the three
Highways pathfinder projects and will provide a constructive model for
delivering highway maintenance and operations in a largely rural context. The
B - 54
uniqueness of the Island’s road network, characterised by the following,
provides a valuable benchmark for future policy and standards development:
• A largely rural road network and an extensive rights of way network
• a largely captured economy allowing
o correlation between transport investment and economic
regeneration
o a significant proportion of the investment and multiplier effects to
remain in the Island to regenerate its economy,
• an operational regime for delivering a comprehensive highways service
in an environmentally sensitive area.
This PFI project clearly meets national regional and local strategic objectives by
removing the backlog of highway and street lighting repairs, providing a long-
term service strategy to maintain assets at an acceptable and appropriate
standard, over a long period, by environmentally sympathetic and sustainable
means.
The IWC Highways PFI, together with the other two Highways pathfinder
projects, will provide the Department for Transport with an ability to develop
national standards to cover the full spectrum of highway network characteristics
across local authorities in England and Wales.
B - 55
2.13 Historic Built Environment 2.13.1 Public Realm The visual impact of highway works can significantly affect the quality and
appearance of the public realm. This is particularly important in designated
areas such as AONBs, conservation areas or directly affecting the setting of
listed buildings and historic assets. Traditional materials for surfacing, kerbs,
structures and other details should be maintained or replicated.
In addition there are some remaining traditional street lamps, railings, signs and
other structures which make an important contribution to the locally distinctive
character of towns and villages. Any historic street furniture will therefore be
recorded and retained.
The overall quality and appearance of the Island’s public realm is important to
residents and businesses and directly affects the tourist industry. The use of
appropriate design and materials should therefore be given prominence in the
output specification.
2.13.2 Archaeological Heritage The Island has in excess of 6500 known Archaeological Sites and Monuments.
In addition there are other Scheduled Monuments and Areas of High
Archaeological Potential. It is unlikely that the reconstruction and resurfacing of
carriageways will result in disruption of any archaeological site; however, the
Council will set out all know sites to prevent the PFI Provider unwittingly
trespassing into these areas. Where the refurbishment of the highway is likely to
encroach into an identified site, the PFI Provider will be required to carry out a
comprehensive assessment and develop appropriate mitigation measures.
2.13.3 Natural Environment - Species and Habitats The Island is home to a number of rare and endangered species and also to
significant and varied areas of sensitive habitats. Works within the boundary of
the highway and public rights of way land have the potential to adversely impact
on these or nearby species and habitats.
Whilst the highway surface itself does not form a natural habitat, verges,
hedges, banks, ditches and roadside trees contribute to the natural
B - 56
environment. Natural habitats are recognised through a hierarchy of
designations from those of local importance such as Sites of Importance to
Nature Conservation (SINC), national as Sites of Special Scientific Importance
(SSSI), through to European Special Protection Areas (SPA) and Special Areas
of Conservation (SAC) and wider international designation as Ramsar Site for
wetlands and wildfowl. Some species have specific protection under UK or
International legislation.
The PFI Provider will be expected to develop highway schemes that protect the
natural environment for these species. Good practice and protocols built into the
maintenance of highways and verges in rural environment will ensure that the
natural environment will be protected and enhanced throughout the PFI contract
period.
2.13.4 Historic Environment Action Plan (HEAP) The HEAP contains the historic roads, tracks and lanes and their associated
boundaries, hedgerows and earthworks. These are described in the "Historic
Routeways" HEAP report. The HEAP requires early liaison with the County
Archaeology Service, the Conservation and Design Team and the AONB Unit to
ensure that any work does not have an adverse effect on the historic
environment. These requirements will form part of the Output Specification and
the PFI Service Provider will be required to carry out the required consultations.
2.14 Transport Asset Management Plan A Transport Asset Management Plan (TAMP) was produced, in partnership with
Chris Britton Consultants, during 2006 to aid knowledge based decision making.
The highway inventory was initially prepared by John Reid Consultants. This
has now been updated to take into account the fact that the Isle of Wight
Council has been chosen as a pathfinder Highways Maintenance PFI authority.
The TAMP is the Council’s primary document for detailing the standards and
priorities applied to maintaining the Island’s transport network for all users. The
plan mirrors the proposed PFI since it covers all elements of the transport
infrastructure. The TAMP will serve as a baseline to the PFI Project.
B - 57
2.15 The Network Existing assets that will become the components of the project can be
summarised as follows:
• Highways (803km in length)
• The network of public rights of ways (PROW) for which the Council is
responsible is 827km in length, comprising 514km of footpaths, 266km of
bridleways and 47km of byways open to all traffic (BOATs), and which
together make up about half of the Island’s total highway mileage.
• Bridges and Structures
• Footways and Kerbs
• Drainage
• Safety Fencing
• Street Lighting
• Street Furniture
• CCTV
• Grass Cutting
• Car Parking
2.15.1 Asset Inventory, Condition and Survey Data The council has built an exceptionally thorough record of its assets and
repeatedly surveyed the network to improve the confidence level in related
condition data. The information is fully digitised and held in layers linked to an
in-house Geographic Information System (GIS) and will be available in the
project Data Room. The council will continue to survey assets and maintain
records up to the point at which responsibility is handed over to the PFI
Provider.
A full inventory of street lighting, illuminated signs, bollards and other electrical
apparatus (e.g. CCTV), linked to a GIS system and including substantial
column, lantern, control and supply data forms part of the commercial database,
together with annual assessments of condition of the entire stock.
The asset inventory information available in the Project Data Room is outlined
below;
B - 58
a. A detailed inventory of all bridges and retaining walls supported by six-
yearly Principal Inspections (PIs) and bi-annual General Inspections (GIs)
of all structures on the highway network. Complete data for the last three
rounds of both PIs and GIs will be kept in the Data Room. About 40
culverts are in the process of being re-classified as bridges, due to
redefining their span.
b. An independent sample site survey based on inspection of 272 lighting
points on the 32 streets selected at random across the network indicated
an error rate for the street lighting inventory of just 1%.
c. A drainage inventory made up of surface features, gullies and manholes,
has been completed and partial information is available on underground
features such as pipe locations and size. The sub-surface inventory is
about 60% complete but with an accuracy of 90+%. Some "poor"
condition drains have CCTV footage coverage to compliment visual
surveys.
d. A comprehensive rural rights of way inventory with fully completed
Definitive Map and Statement directly linked to a GIS system. Records of
one hundred percent condition surveys undertaken each year by trained
volunteers supervised by the Council's staff.
e. Car parking inventory data on the primary assets, including ticket
machines, the number of parking spaces (on and off-street), their
locations and type of surfacing. A Secondary asset and condition survey
is due for completion in Autumn 2009.
f. Full inventory data for all other assets including:
• Traffic signals (with age profile data)
• Road signs and street nameplates
• Street furniture (bollards, benches, bins, shelters, planters)
• Safety fencing
• Highway trees.
B - 59
A summary of the assets covered in the asset data base is set out below;
appendix 1 sets out the details.
Asset Item Type
Length/Number
PEDESTRIAN GUARDRAIL 13.1 km Safety Fencing SAFETY BARRIER 2.3 km GULLY 19626 no MANHOLE 8512 no LINEAR DRAINAGE CHANNEL 4.2 km CARRIER PIPE 370 km
Drainage
CULVERT 189 no CARRIAGEWAY - A ROAD 128.3 km CARRIAGEWAY - B ROAD 92.1 km CARRIAGEWAY - C ROAD 171.9 km CARRIAGEWAY - UNCLASSIFIED 410.4 km
Pavements
FOOTWAY - 1, 1a and 2 Footways FOOTWAY - 3 and 4
767.22 km
FOOTPATH 514 km BRIDLEWAY 266 km BOAT 47 km
Rights of Way
GREENWAY 31 km KERB 1031.2 km Kerbs and
Channels CHANNEL 145.6 km ROAD SIGN (NON-ILLUMINATED) 14815 no STREET NAMEPLATE 3501 no Road Signs
ROAD STUD 127.1 km
STREET LIGHT Electrical Items
ILLUMINATED SIGN OR BOLLARD
14327 no
B - 60
OTHER (CCTV, BEACON, ETC) TRAFFIC SIGNAL 79 sets BRIDGE 119 no Structures RETAINING WALL 599 no BOLLARD 3812 no HAZARD MARKER 4634 no SHELTER 241 no BIN 1046 no SEAT 1027 no
Street Furniture
PLANTER 219 no Landscape TREE 1715 no
TICKET MACHINE 142 no PAY-AND-DISPLAY ON-STREET PARKING SPACE 890 no
PAY-AND-DISPLAY OFF-STREET PARKING SPACE 4899 no
FREE OFF-STREET PARKING SPACE 1009 no
PAY-AND-DISPLAY ON-STREET PARKING ZONE 15 no
PAY-AND-DISPLAY OFF-STREET CAR PARK 52 no
Car Parking
FREE OFF-STREET CAR PARK 29 no
The following information on asset condition will also be available in the Project
Data Room;
1. A video of the entire network is available from SCANNER. This provides
additional information to the basic numerical data, and enables a view the
network without having to repeatedly drive it.
2. SCRIM for the A, B and C class roads measured annually.
3. Annual SCANNER data for all A, B and C class roads. This data has
recently been updated by mini-SCANNER survey of the unclassified roads.
4. Annual Coarse Visual Inspection (CVI) data for the unclassified road
network.
B - 61
5. 100% Detailed Visual Inspection ("DVI") data for all Category footways for
the last year.
6. Deflectograph data for all A class roads, together with those B and C class
roads that are subject to substantial HGV traffic.
7. A full inventory and condition data of kerbs, channels (solid and linear
drainage), edgings, street furniture, road signs, safety fencing and bollards.
2.15.2 Road Pavement Condition The Council, through its consultant WDM Ltd, commissioned a survey condition
assessment model to calculate the carriageway/footway backlog and on-going
life cycle requirements of the network incorporating suitable hand-back
provisions. Through the model, industry standard survey data is translated to an
output based performance measurement which is repeatable, transparent, and
accurately reflects asset condition at specified milestones during the project life.
The model operates at three levels; network hierarchy, condition banding, and
road section criteria.
An overall hierarchy based Network Condition Indicator (NCI) is generated to
reflect the specific needs of the network where differing target criteria are
applied depending on the road hierarchy to which it relates. Surface condition
(SCANNER) together with skid resistance (SCRIM) and residual life as a
measure of structural strength (Deflectograph) are used as survey inputs.
Individual thresholds are set to represent the required service levels. The use of
nationally recognised survey methods will give prospective Service Providers
confidence in the resulting information and allow future prediction based on the
trend analysis of previous annual data.
SCANNER surveys are be used for all Hierarchies 1-4. The DfT national
indicator, the Road Condition Indicator (RCI), allocates road lengths, or
networks, into three condition bands Red, Amber, and Green. “Red” indicates a
length of highway “where maintenance should be considered”. For Hierarchies
1 to 3 the prime NCI will be a maximum % of RCI by length; the value chosen
reflects the performance of good standard of service. As “Red” levels can be
B - 62
maintained or reduced by allowing the “Amber” band to increase at the expense
of the “Green” the NCI will be required to have default levels of Amber and
Green.
Previously, Coarse Visual Inspections (CVI) has been used as the basis for
Hierarchy 4 roads condition. In a move to embrace innovation, SCANNER
output has recently been developed nationally for unclassified roads and these
now form the basis from which IWC models Hierarchy 4 condition.
In order that an indicator cannot be influenced by visual assessment of the
surface alone the NCI for Hierarchies 1-2 will include an assessment of
“strength”, from Deflectograph. Safety must also influence the indicator; skid
resistance from CSC values will provide the necessary inputs. Upper threshold
of RCI, and/or intervention levels for individual parameters will act as trigger for
maintenance.
The national indicator for footways (Class 1 and 2) will form the Footway
Condition Index (FCI), based on the results of DVI surveys. A lower standard
FCI will apply to Class 3 and 4 footways to reflect an appropriate service level.
The detailed operational aspects of the technical modelling process are
discussed in further detail at appendix 2.
2.15.3 Street Lighting The table below provides an overview of the age and stock profile of the street
lighting asset.
B - 63
Age Steel Conc Alum Wood
Pole Other Total Profile
0-10 Years 3535 0 0 145 19 3699 30.65%
10-20 Years 3149 8 55 292 40 3544 29.37%
20-30 Years 429 259 1033 456 13 2190 18.15%
30-40 Years 235 468 1483 161 1 2348 19.46%
40-50 Years 39 61 103 36 48 287 2.38%
Total 7387 796 2674 1090 121 12068
Profile 61.21% 6.60% 22.16% 9.03% 1.00% 100.00%
Electrical Supply Network
Information within the Street Lighting and Illuminated Traffic Signs Inventory
indicates that between 2% and 5% of the electrical supply network consists of
private cable network. The remaining 95% to 98% of the electrical supply
network is provided by the Distribution Network Organisation (Southern
Electric).
2.15.4 Traffic Signals The council has assessed the condition of the Traffic Signals asset throughout
the Island to determine the level of refurbishment/upgrading required. The
assessment works have indicated that the asset is in very poor condition and
could result in electrical safety issues in the future.
Details, including age and stock profile of the Traffic Signals are provided
below:
B - 64
Age SitesSites
Profile
Signal
Points
Signal
Profile
0-10 Years 51 66% 304 76% 10-20 Years 24 31% 90 22% 20-30 Years 2 3% 6 2% 30-40 Years 0 0% 0 0 40-50 Years 0 0% 0 0
Total 77 100% 400 100%
2.15.5 CCTV The council has assessed the condition of the CCTV asset throughout the
Island to determine the level of refurbishment/upgrading required. This
assessment indicates that the asset is in poor condition The Council is
currently progressing a CCTV refurbishment scheme for which tenders were
returned in May 2009; the scope includes an increase in the number of
cameras, refurbishment of the control room and maintenance of the existing
stock.
2.16 Current Service Delivery and Performance The majority of the Council’s highways related services are managed from
Newport, with satellite stations at Ventnor, Ryde and Cowes. Most of the
professional, technical, administrative and financial functions are carried out in
house with only a small amount of backup from technical consultants.
In relation to works, the Council acts as a commissioning agent and, with the
exception of a 3 man team on the rural rights of way network, no longer has a
direct labour organisation. Construction and maintenance work is carried out
through annual or framework contracts. On and off street parking enforcement
is undertaken by the Council’s in house team, and revenues on the Floating
Bridge are collected by Council’s in house staff.
Performance is monitored by a combination of National and Local performance
indicators. Service performance is good regarding cyclical maintenance, such
as highway verge maintenance and street cleansing. However, national
B - 65
indicators show the Council is generally in the bottom quartile on asset
condition
2.16.1 Current Spending on Highways Services Following years of less than adequate investment in highway services, the rate
of deterioration has outstripped the rate of investment, resulting in continually
declining standards of service. Last year, the network condition had reached
such a low point, that the council had to find additional funding to prevent
further deterioration. The current levels of annual spend is:
2006/07 2007/08 2008/09
Capital £
1,254,691
332,490
2,073,049
Revenue £
1,658,866
1,490,700
1,837,900
2.17 Drivers for Change 2.17.1 The Service Gap The Council's statutory duty under the Highways Act 1980 to maintain the
highway network means that it will be necessary to provide a highway
maintenance service for the foreseeable future.
Paragraph 3.4.1 of "Well-maintained Highways - Code of Practice for Highway
Maintenance Management" published by the UK Roads Liaison Group of CSS
in 2005, declares that the purpose of highway maintenance is to maintain the
highway for the safe and convenient movement of people and goods. The core
objectives of highway maintenance are stated as the delivery of:
• Safety;
• Serviceability; and
• Sustainability.
The seven most significant elements of work on the Council's highway network
are:
1. Carriageways
2. Footways
B - 66
3. Bridges and other structures
4. Street lighting
5. Drainage
6. Public rights of way
7. Car parking
The differences between the current and desirable positions (the "Service Gap")
for each of the three core objectives in relation to the seven most significant
elements of work on the Council's highway network are described below.
2.17.2 Carriageways Safety
The safety of carriageways can be quantified by:
• Surface skid resistance;
• Number of carriageway Insurance Claims by third parties; and
• Number of urgent defects (ie. those treated within 24 hours)
Surface skid resistance - the skid resistance of A, B and C class roads on the
council's network is tested annually. The 2008 surveys indicated that 32 percent
of A roads, 22 percent of B roads and 31 percent of C roads are currently at or
below the Investigatory Level.
The number of third party insurance claims relating to carriageway defects
increased by a factor of three in the past five years, as shown in the chart
below.
Third Party Claims Relating to Carriageway Defects (June 2009 Data) 162
104
56 47 51
04/05 05/06 06/07 07/08 08/09Year
Num
ber o
f Cla
ims
B - 67
The number of instructions to attend highway emergencies due to urgent
carriageway defects, such as potholes, has increased by a factor of three in the
last three years, as shown in the chart below.
Carriageway Emergency Instructions Issued (2 hour response)
hese charts indicate an increasing number of events that are compromising
Serviceability
The serviceability of carriageways can be quantified by:
• Asset condition; and
• Ride quality (e.g. smooth, pothole free surface);
Asset Condition
T
the safety of the carriageway.
- Until recently, the general condition of carriageways was
measured and compared nationally using a series of BVPIs which indicate the
08 BVPI results for the Isle of Wight in
quartile thresholds for that year. The Isle of
bottom quartile for both unitary authorities and
uthorities.
1892
iden
ts
747581
No
of In
c
06/07 07/08 08/09Year
percentage of the network where structural maintenance should be considered.
The table below shows the 2007/
comparison with the top and bottom
Wight results mostly fall into the
all English a
B - 68
C
P
arriageway Condition Indicators 2007/08
erformance Indicator Unitary authorities All England
R07/08 quartile quartile quartile
quartile
ef Description
IWC Actual Top Bottom Top Bottom
BV223 % of the principal road
network where structural
maintenance should be
considered
9 3 7 3 7
BV224a % of the non –principal road
network where structural
maintenance should be
considered
10 4 11 5 10
BV224b % of the Unclassified road
network where structural
maintenance should be
considered.
38 7 15.5 8.5 18
Since 1 April 2008, national indicators NI168 and NI169 have replaced best
value performance indicators BV223 and BV224a. However the national
indicators are measured on the same basis as the 2008 best value performance
indicators. A comparison of the BV results and the available NI results are given
in the table below, which shows that carriageway condition continues to
deteriorate.
Carriageway Condition Indicators 2007/08 and 2008/09
IWC Actual Performance
2007/08 2008/09
Performance Indicator BV223 NI168
Percentage of the principal road
network where structural
maintenance should be considered
9 12
BV224a NI169
B - 69
P
road network where
structural maintenance should
c ere
ercentage of the non –principal
10 15
onsid d
c f a ategories of the council's carriageways falls
well sh he best performing, or even average performing,
authori an only be closed by a significant increase in
investment in the future.
Ride Q
In all ases, the condition o
ort of that achieved by t
ties and these gaps c
ll c
uality - Longitudinal R
. The latest 10m Pro
oad Profile has been used as a measure of ride
quality file and 3m Profile SCANNER results given in the
table below indicate the percentage of A, B and C class roads that have road
old c tained w UKPM
Percentage of network above the upper threshold
profiles worse than the upper thresh on ithin S.
Road Cla
10m Profile 3m Profile
ss
A 18 12
B 17 14
C 34 27
ling of carriageway material takes place at present, and some in-
situ recycling has been undertaken. There are no carriageways surfaced with
2.17.3 Footways
Safety
ays can be qua y:
nce claims by third parties; and
defects requiring treatment within 24 hours)
As shown in the chart below, the annual number of third party insurance claims
relating to footways defects is variable but has been on a generally upward
trend in recent years.
Sustainability
Some recyc
noise attenuating materials on the council's network.
The safety of the footw ntified b
• Number of footway insura
• Number of urgent
B - 70
Relating to Footway Defects (June 2009 Data)
dom annual
variation or indicative of the impact of a deteriorating network condition.
ergency Instructions Issued (2 hour response)
ion of footways, until recently, was measured and compared
lly using BVPI 187. The table below shows the 2007/08 BVPI result for
bottom quartile thresholds for
for both unitary
218
149 153
07/08 08/09
No
of In
cide
nts
Third Party Claims
30 28 27
04/05 05/06 06/07 07/08 08/09Year
Cla
im23 18
Num
ber o
fs
As shown in the chart below, the number of emergency instructions to attend to
urgent footway defects has also been on an upward trend but dramatically
increased in 2008/9. It remains to be seen whether that is a ran
Footway Em
06/07
Serviceability
Year
The general condit
nationa
the Isle of Wight in comparison with the top and
that year. The IOW performance falls into the bottom quartile
authorities and all English authorities.
B - 71
Footway Condition Indicator 2007/08
erformance Indicator Unitary authorities All England P
Ref Description
IWC Actual07/08
Top quartile
Bottom quartile
Top quartile
Bottom quartile
BVPI 187 Conditions
surface footway 46 12 30.3 14 29
Sustainability
Sustainability is not currently a significant factor in the maintenance of highway
2.17.4 Bridges and Other Structures on the Highway Network
Parapet risk assessments (PRAs) were undertaken in 2005 by OPUS and a
priority ranking for upgrade works was derived from its report. Three bridge
parapet upgrades are being carried out in 2009/10, and more will be undertaken
prior to commencement of the PFI contract.
This assessment of parapets did not include the 600 or so retaining walls which
are the Council's responsibility. It is anticipated that a substantial number of
these will not conform to modern standards.
erviceability
nce of regular routine maintenance)
Structural condition
pavements.
No recycling of footway material takes place at present.
Safety
S
From a user perspective the key requirements for structures are:
• Structural condition (i.e. safe for use and structurally sound);
• Adequate parapets (in terms of height and strength);
• Full access (no temporary weight restrictions or height limits); and
• Aesthetic appearance. (i.e. evide
– The Council calculates a Bridge Condition Score (BCS)
from its inspection data. This is an 'existing condition' score with a numerical
value between 1.0 and 5.0, but it does not recognise structurally sub-standard
B - 72
pet without significant defects would be
given a BCS score of "good", even though that parapet does not meet current
The current dis es w.
2009 Highway and Car Park e a lls
Good Poor Failure
elements. For example, a bridge para
containment standards. tribution of BCS valu is shown belo
s Bridg s and Ret ining Wa BCS Values
Very Good Fair Poor Very BCS Value
1.00 - 1.30 1.31 - 1.80 1.81 - 2.70 2.71 - 3.7s
0 3.71 - 4.70 4.71 - 5.00
No. 238 (33%) 306 (42%) 56 (8%) 6 (1%) Nil
structures 112 (16%)
Total Number of bridges and retaining walls for Highways Department / Car Parks = 718
t the majority
ndards.
orrosive
columns
due
to the combination of age and environmental conditions. Additionally it is
Structural assessments are undertaken on an intermittent basis bu
were carried out over 10 years ago and reviews are required to re-evaluate the
load-carrying assessment calculations.
The BCS figures demonstrate that the overall 'existing condition' of the bridge
stock is in fair to good condition, however, given the lack of progress on
structural assessment and as illustrated by the backlog of PRA’s significant
work may be required to upgrade to current sta
Sustainability
Sustainability is not currently a significant factor in the maintenance of highway
bridges.
2.17.5 Street lighting Safety
In common with many other local authorities the Isle of Wight has a history of
under investment in its lighting stock. This is compounded by the c
effect of the salt-air which accelerates the degradation of street lighting
and traffic sign posts. Consequently, a significant proportion of the IWC street
lighting and illuminated traffic signs asset is in seriously degraded condition
estimated that 50% of the existing lighting levels fall below current European
and British lighting standard requirements. As part of this Project, lighting levels
B - 73
erviceability
the
provision of a street lighting maintenance service with SEC Ltd. The contract is
operated under a traditional term contract arrangeme cured CE
el or ported
performance in rectifying street lighting faults against the BVPI performance
he table below, which details the term maintenance contractor’s self reported
faults against the performance
rs set by the IWC, indicates a performance which would be accepted as
will be reviewed and modifications made to provide a solution inline with
BS5489.
S
The Isle of Wight has a term maintenance contract arrangement for
nt pro using the I
model form of contract.
The table b ow, which shows the term maintenance contract ’s self re
indicators, indicates a performance levels consistently above target standards.
T
performance in rectifying street lighting
indicato
a high standard nationally, even though it falls below the very demanding local
target;
Performance Indicator
Definition Target IOW Actual Performance Ref
05/06 06/07 07/08
BV215a
Average no of days taken to repa
a street lighting fault which is
under the control of the local
authority
3 1.89 2.39 1.98
BV21
Average time taken to repair a
street lighting fault where
e is under the contr5b
response tim o
of a DNO
20 9.01 6.13 9.91
B - 74
PI Ref PI Definition Target Actual
05/06 06/07 07/08
LPI % Lights in Light 100 99 99 99
Sustainability
Sustainability is not currently a significant factor in the maintenance and
peration of highway lighting.
The maintenance regime for Traffic Signals is constrained by budget pressures
and the age and condition of a significant proportion of the asset. Reactive
maintenance and fault r ion tak ede the
budget is re s. In some cases pole corrosion is in such
an advanced state that the security of lantern and bracket to the pole cannot be
guaranteed.
Service
Siemens Traffic Controls maintains the traffic signal network through a term
mainten joint agreement with Portsmouth City Council.
reak llow for termination of the co
allow fo cement of a PFI contract.
o
2.17.6 Traffic Signals Safety
ectificat
quired for these purpose
es prec nce and a vast majority of
ability
ance contract which is a
clause has been negotiated t
r commen
A b o a ntract to
Functions specified within the contract include those activities detailed below:
B - 75
Sustainability
Sustainability is not currently a significant factor in the maintenance and
operation of the traffic control equipment.
2.17.7 CCTV Safety
In common with many other local authorities, the Isle of Wight has a history of
under investment in its CCTV stock. This issue is compounded by the corrosive
effect of the salt-air which is an important consideration in the delivery of the
Function F crequen y Electric ting o , loop detection, variabmessage signs and sch stallations Annual al tes f all Traffic Signals
ool warning signs inle
General Maintenance - Traffic signal poles, lanterns and brackets, push button controls, outstations, MOVA, monitoring and detection systems, electrical and communications infrastructure
Bi-annual
Numbering s and controller cabinets As required and renumbering of pole
Cleanin aintenance above): g only (additional to general m> Exterior of all road traffic, pedestrian and light rapid transit signal lenses, wait panels, box signs, variable message signs and school warnin
Bi-annual g signs
> Inter it panels, box signs and fibre-optics Annual ior of wa
Cleaning only (additional to above on ‘High Maintenance’ sites) > Extelenseswarning sig
rior of all road traffic, pedestrian and light rapid transit signal , wait panels, box signs, variable message signs and school
ns Quarterly
Bulk lamp changes
> Road traffic, wait, pedestrian and light rapid transit lanterns Bi-annual
> Box sign lanterns and School Warning Annual Respond to faults identified / reported – from inspections, vandalism,accident s > Priority one faults - emergency faults 2 Hours
> Priority one faults - urgent 4 Hours
> Prior 24 Hours ity two faults - normal
> Priority three faults - other 7 days
> Priority four faults - outstanding As agreed
B - 76
ervice - the sea air affects many of the CCTV masts and cameras.
Consequently a significant proportion of IWC’s CCTV asset is seriously
graded due to age and environmental conditions
rcent of the CCTV
p .
r in the maintenance and
og of renewals and
t being
han programmed preventative
maintenance. Whilst it is not possible to explicitly assess the effect that the poor
red that the presence of
es have safety implication. ally it is a
Serviceability
y or local indicators identifying the con highway
Sustainability is not currently a significant factor in the maintenance and
ghway drainage.
he rural rights of way play a significant role in the Eco Island vision through a
tiative to re-integrate the rights of way network with more
al forms of transport and thus support and promote sustainable
s
de
Asset condition surveys have confirmed that some 75 pe
apparatus is in an unsafe condition or suffers from degraded erformance
Sustainability
Sustainability is not currently a significant facto
operation of the CCTV equipment.
2.17.8 Drainage
Safety
Again due to budget constraints, there is a significant backl
improvements, which requires a substantial proportion of the budge
devoted to reactive maintenance rather t
condition of this asset has on safety, it can be conjectu
surface water and local flooding do Addition
recognised nuisance in streets with pedestrian movement.
There are no statutor dition of
drainage systems.
Sustainability
operation of hi
2.17.9 Rural Rights of Way T
pioneering ini
tradition
transport, health and tourism.
B - 77
ct to the highway bridge
spection regime. Thus, whilst there are no reported safety concerns, this
sured the percentage
of the total length of rights of way that are easy to use by the general public,.
e council has completed a 100% survey of its PROW using
volunteers supervised by its own staff, This information, together with
Wight was the only authority to attain the
overnment’s national target for bringing its public rights of way network into
the largest walking festival in the country based
ell-used by residents.
70%60%
10%0%
2002 2003 2004 2005 2005 2007 2008
Eas
y to
Safety
There are a number of bridges on the network which do not currently form part
of the road network bridges and are not subje
in
position is based on visual inspection rather than comprehensive inspection by
professional engineers.
Serviceability
The condition of Public Rights of Way (PROW) was reported using BVPI 178
until 2008. Based on a 5% annual sample, BVPI 178 mea
For some years, th
trained
regular reports of problems from many user groups, has allowed the council to
maintain its PROW network in a good condition, as shown by the consistently
high percentage in ‘easy to use’ condition shown below.
100%90%80% U
se
50%40%30%20%
% o
f PR
OW
Ten years ago the Isle of
Year
g
usable condition. It now hosts
around a major charity walk and also holds a cycling festival. In 2008, the
walking festival attracted over 24,000 participants (see table below) and thus
the PROW network is a key element for the Island’s tourist economy, as well as
an amenity highly valued and w
B - 78
Sustainability is not currently a significant factor in the maintenance and
operation of the PROW network although by its nature it tends to be
managed in line with sustainability principles.
2.17.10 On and Off-Street Car Parking The Council currently manages both on-street and off-street parking as a co-
ordinated whole via a Civil Enforcement Area. Both on-street and off-street
car parking are key elements in meeting the Council's aims for community
safety and congestion reduction.
Serviceability
onsidered to be generally
fair to good but with some exceptions which fall into the category of poor.
5,000
25,000
20,000
15,000
10,000Pa
rtic
ipan
ts
0
Participation in the IOW Walking Festival 1999 to 2008
The Council has produced a statutory Rights of Way Improvement Plan
(ROWIP) as part of the Local Transport Plan. The Highways PFI Project will
enable the Council to deliver the aspirations contained within the ROWIP.
Sustainability
1999 2003 2004 2005 2006 2007 2008Year
Since 2007, the Council has operated a Civil Enforcement Area, the
objectives of which are to contribute to the effective delivery of wider
transport objectives.
The Council is responsible for 15 chargeable on-street parking zones, 52
pay-and-display off-street car parks and 29 free off-street car parks/lay-bys.
The condition on the surface on the cark parks is c
B - 79
However the ambience of many of them is not commensurate with an area of
high tourist demand.
The Council formally inspects its off-street car parks quarterly and
encourages its Civil Enforcement Officers to report defects during their daily
visits.
Sustainability
The Council currently operates a proportion of solar powered ticket machines
a f its air pollution
control measures. Otherwise Sustainability is not currently a significant factor
he A3054 Bouldnor Road is the coastal road in the far north west of the
ajor access route to the car and passenger ferry terminal in
ad above it. This is considered
be both unsafe and unserviceable.
Island’s Strategic aims for sustainable
evelopment and the council’s ambitions for providing a transport network
prove the condition of the highway and act as a stimulus for
f maintenance sustain the network at a steady state
and part of a holistic approach including operation and maintenance to
managed and monitored effectively.
nd provides free parking for low emission vehicles, as part o
in the maintenance and operation of car parks.
2.17.11 Major Works - Bouldnor Road
T
Island and a m
Yarmouth harbour. The road runs along the top of a shallow cliff or
embankment, supported by a sea wall at its base. Movement of the sea wall
is threatening the safety and stability of the ro
to
2.18 Project Description/Overview
The IWC Highways PFI Project follows the “fence to fence” concept to
develop a holistic approach to highway maintenance. The Project provides
the best strategic fit with the
d
that will both im
the Island’s economy. The Project focuses on the key elements of the
highway with an intention to improve the current network condition to a level
where normal levels o
create synergies and avoid contractual boundaries with third parties within
the fence to fence boundary. The focus is on ensuring that the PFI provider
can be charged with an output based specification that has minimum conflict
with Council retained services thereby enabling the PFI contract to be
B - 80
2.1The high-level summary of the Highways PFI scope is described below;
ap
se
2.19.1 Roads The Island’s 803 km of rural and urban roads that are currently being managed
pu
cla
ref
ma footways, such that the
development of category 1 defects is arrested and the general condition of the
ne t’s highway network at the median
lev
Sk
for
10
cy
remainder of the 25 year period. Roads that are currently privately maintained
will not form part of the PFI scope.
2.19.2 Structures It is intended that, on c
tonne capacity. Currently, 10 struct
However
number will be kept
include tho
Full access
9 Project Scope
pendix 3 sets out the details of the PFI scope and the council retained
rvices.
blicly, will form part of the PFI network. These would include the A, B and C
ssified roads and the unclassified roads. The scope will include
urbishment of a significant proportion of all classifications of publicly
intained road network including kerbs and
twork is raised to position the Isle of Wigh
el of Local Authorities when assessed in accordance with National Indicators.
idding resistance of the network will be brought above the investigatory level
the relevant hierarchy. The highway drainage system will be brought to
0% operational capacity. Throughout the PFI period there will be on-going life
cle, routine and winter maintenance and operation of these roads for the
ompletion of the CIP, works all structures will have a 40
ures require works to achieve this position.
works are currently programmed for some of these structures and the
under review throughout the PFI tender period to only
se not already treated.
- There are currently 8 structures on the network with a temporary
of these structures belongs to Network Rail. The non-
s will be strengthened as part of the PFI Project and the
s removed. There are currently two bridges with height restrictions on
gs to Network Rail (as above) and one to the privately
Steam Railway. There are no plans to remove these
weight restriction. One
Network Rail structure
restriction
the network. One belon
owned Isle of Wight
restrictions
B - 81
As part of the PFI Project, the assessment and provision of containment in line
97/07 to parapets, piers and soffits for bridges, retaining
and follow-up repairs will be undertaken to ensure their continued
tegrity and functionality. Parapet work will only be considered on retaining
an 1m high. While parapets on Network Rail bridges will not be
.19.3 Rural Rights of Ways of rural rights of way interlink with the road network and
project will also require upgrading of the
urfacing, bridges, stiles and signage and the on-going maintenance of these
roads contain compulsory, directional and tourist signs, roadside
eating, bus shelters and roadside pot plants. During the CIP, signage will be
with TD19/06 and IAN
walls and other structures will be undertaken and implemented during the core
investment period. Thus, safety deficient parapets will be upgraded and regular
inspections
in
walls greater th
included, since they are not the responsibility of the council, the PFI Project will
include undertaking risk assessments and carrying out any necessary safety
fence works on the approaches to Network Rail bridges, in order to minimise
the risk of errant vehicles encroaching onto the railway.
Aesthetic appearance is not seen as a major issue, and routine painting and
graffiti removal is currently undertaken as required as part of routine
maintenance. The Council consults with the local community where large-scale
works are undertaken within the AONB to ensure that new or improved
structures are visually acceptable. This will continue under the Project.
The PFI contract will include the normal annual maintenance and life cycle
replacement works to all structures.
2The Island’s 827 km
form part of the Island’s highway network. The rural rights of ways will form part
of the PFI network. During the CIP, they will be upgraded to provide an
acceptable level of surface quality providing unimpeded access. Subsequently
an appropriate level of life cycle maintenance such that the asset is fit for
purpose will be implemented. The
s
assets and the adjoining hedgerows. There will be a degree of synergy between
road maintenance and rural rights of ways; if acceptable planings from the
roads are able to be used as the main source for upgrading the rights of way
surface.
2.19.4 Street Furniture The Island’s
s
B - 82
reduce the risk of third
arty claims. The combination of footpath renewal with the carriageway renewal
at some
f the major junctions. The Traffic Signal associated assets are in very poor
intended that all traffic signal installations
re upgraded to comply with the relevant standards, reduce the risk of failure
ology to reduce lamp changes and power
n, through a low carbon footprint based output specification. The PFI
ontractor will then maintain the whole system for the PFI contract period.
refurbished such that visibility is compliant with current standards. As
appropriate, other assets will be available for use, clearly visible and in a good
state of repair. Again, the upgraded assets will be maintained at the refurbished
standard throughout the PFI contract period. It is intended that the
refurbishment and maintenance of street furniture, coupled with carriageway
and footpaths will uplift the Island’s street scene.
2.19.5 Footways and footpaths The urban roads and town centres have an extensive network of footways. As
part of the CIP works the footways will be upgraded to provide an acceptable
structure and surface, minimising the current defects to
p
offers the opportunity to have a single upgrade programme, which will resolve
utility diversions and address drainage issues all at the same time.
2.19.6 Traffic Signals The Island has 79 sets of traffic signals that help to control traffic flows
o
condition and have been identified as a safety hazard. In addition, the
technology is now out of date. It is
a
and adopt the latest techn
consumption in line with the carbon reduction aims of government.
2.19.7 Street Lighting The 12,068 lighting columns on the Island fall well below the current standard
for lighting. It is assumed that all lighting columns over 20 years old will be
renewed during the CIP. All remaining columns will be renewed if necessary
due to structural condition and by default at year 20 of their life; such that the
whole stock will have been replaced by the end of the contract. The
specification will be to current codes of practice and will require the application
of modern technology, such as remote switching and energy saving equipment
and desig
c
B - 83
mounted on special masts or
ghting columns, both of which fall within the project’s “fence to fence” boundary
e project availability regime. Additionally, the
.19.9 Grass Cutting and Street Cleansing roach allows all services that need to be carried out on
t scope and
racticality of delivering these intertwined services using different delivery
ced the council that they should be part of the wider
d by
e council and is tolled for all vehicular traffic, and free for foot passengers. It is
tended that the Floating Bridge will be renewed as part of the CIP works.
2.19.8 CCTV The existing CCTV unit and control room are in poor condition and the council is
currently undertaking a renewal programme. Consequently, the next round of
life cycle renewal in 10 years time will be at the end of the proposed 7 year core
investment period. However, CCTV cameras are
li
and replacement would disrupt th
power required for CCTV is likely to come off lighting columns where
appropriate and synergies in the maintenance of the CCTV and street lighting
are likely to result in operational cost savings. CCTV is therefore included within
the Project scope assuming replacement of all cameras after a ten year life and
full transfer of responsibility for operational performance and structural integrity
2The fence to fence app
and adjacent to the highway to be synchronised, deriving maximum efficiency in
service delivery. This integrated approach enables grass cutting to be followed
by street cleansing and drain cleansing to meet the output specification
requirements.
Street cleansing was excluded from the scope at the Expression of Interest
(EOI) revision in 2007. However, the detailed analysis of the contrac
p
mechanisms has convin
Highways PFI Project. In addition, following detailed analysis and soft market
testing, the council has decided to include all grass cutting, including parks and
gardens, within the PFI scope to gain the financial benefits of economies of
scale.
2.19.10 Floating Bridge The coastal road network provides the vital circulatory route around the Island.
The Floating Bridge linking Cowes and East Cowes provides a link which is vital
to completion of the coastal route. The Floating Bridge is currently operate
th
in
B - 84
he Expression of Interest did not include the Floating Bridge in the scope;
g a more strategic approach to delivering the PFI, the Council is
cket machines are utilised in both locations and tariffs are inter-linked. It
on and off street car parking as a
fs will remain with the council.
capital funding to address the stability of the highway and it was
xpected that the refurbishment would have been completed ahead of the
wever, based on the latest timescales, funding for the
T
however, takin
convinced that its inclusion is vital for the success of the PFI. Soft market
testing confirms that the industry’s appetite for managing the tolled crossing
offers considerable scope for commercial innovation. The crossing tariff will be
set by the council and future tariff increases will be limited to an index linked
formula.
2.19.11 On and Off Street Car parking On-street car parking is considered to be an integral part of the carriageway and
is included in scope to avoid a risk mitigation strategy on the part of prospective
service providers by manipulation of an inessential interface. Off-street car
parking is currently managed by the same officers as on-street parking, similar
ti
therefore makes immense sense to keep both
single package within the PFI scope to prevent conflict with service delivery and
thereby gain significant benefit from operational synergies. The revenues from
the car parks will be a council income, collected by the PFI provider, and will be
offset against the Council’s Unitary Charge contributions. The powers to change
car parking tarif
2.19.12 Bouldnor Road Improvement The Council identified a major road reconstruction project on Bouldner Road
along the coastal road between Cowes and Yarmouth. This section of the road
has shown signs of significant movements over a period of time and the Council
developed plans for a major refurbishment of this section in 2006. This stretch
of the coastal road is strategically important for the Island and closure would not
be a practical option. The council made an application for Integrated Transport
scheme
e
Highways PFI Project. Ho
stability work is unlikely to be available before the PFI works commence in April
2013. Given the strategic importance of this road for the Island, the council has
decided that it should form part of the Highways PFI Project. This scheme was
not included at Expression of Interest stage.
B - 85
nd physical requirements of the Output Specification. The latter will
e developed to meet the standards of the Design Manual for Roads and
the requirements of Well Maintained
7 year CIP.
urist trade for economic survival. Cost
ll Lit Highways.
2.20 Standards of the Project
2.20.1 Core Investment Period (CIP) The works carried out during the Core Investment Period will be assessed by
the PFI contractor from the survey data provided by Isle of Wight Council. The
quantum of the works will be assessed by the PFI contractor to meet the
lifecycle a
b
Bridges and to achieve compliance with
Highways, Management of Structures and Well Lit Highways.
The Island’s highway network stands alone and does not allow traffic to divert
across boundaries into another authority’s area. Because of this, the successful
completion of the infrastructure renewal must be very carefully undertaken to
prevent the Island’s traffic coming to a halt. To minimise disruption a traffic
model, see appendix 4, has been produced, which will be made available to the
contractor so that the effect of road closures and the use of temporary traffic
control can be analysed prior to any road being attended. A seven year CIP
has also been chosen to allow the major works to be spread over a longer
period. appendix 5 gives the rationale behind a
The Isle of Wight relies heavily on the to
models for the CIP and also for whole life cycle maintenance include an
allowance for night time working on major traffic routes. Using the traffic model
for guidance it will be necessary to build, within the contract documentation,
constraints on times of working during the peak holiday periods and, in
particular, to avoid traffic delays in the vicinity of major events such as Cowes
Week and the two music festivals.
2.20.2 Post CIP The Output Specification for the post CIP period will be developed to require
steady state maintenance of all assets at the condition achieved by the CIP
investment. The operations and maintenance elements of the specification will
be developed to achieve compliance with the requirements of Well Maintained
Highways, Management of Structures and We
B - 87
se 3.1 Introduction The Economic Case identifies possible options for the Highways PFI, building
on the business need described in the Strategic Case. The Options analysis
takes the Do Minimum option and compares that with seven other possible
options, using a weighted scoring based on the Island’s and the Council’s
strategic priorities. The preferred option is taken forward for the Economic Case
using a NATA style appraisal. The net cost of the preferred option in present
value terms is compared against the present value of benefits to give a Benefit
to Cost ratio
3.2 Options Appraisal There was an initial appraisal of eight options, a Do Minimum and seven
alternative Do Something options, which are briefly described in the table
below.
Option Description
3. Economic Ca
1 Do Minimum: continue with current levels of expenditure and small
amounts of capital investment to maintain the network in its current
condition
2 Strategic network PFI including on-going maintenance but no capital
works on the unclassified network
3 Full network PFI including on-going maintenance and street cleansing
but excluding on/off street car parking services
4 Full network PFI including on-going maintenance but excluding street
cleansing and on/off street car parking services
5 Full network PFI including on-going maintenance, street cleansing and
on street car parking services but excluding off street car parking
services
6 Full network PFI including on-going maintenance, street cleansing and
on/off street car parking services
7 Full network PFI including on-going maintenance and street cleansing
but excluding public rights of way and on/off street car parking services
8 Full network PFI including street cleansing but excluding any life cycle
capital replacement and on/off street car parking services
B - 88
n appraisal system was developed which drew heavily on the Island’s strategic
Criteria were taken from the Eco Island Vision 2008-2020,
Overall
weighting
A
policy documents.
and the Island’s Local Transport Plan 2006-2011 (LTP2), the Island’s Highways
PFI Expression of Interested submitted to the Department for Transport
supplemented by a number of other criteria. Around 80 criteria and objectives
were defined from the different sources and assembled under 12 sub-headings.
Weightings were applied to the different criteria, based on the strategic
importance, to give a 200 point scoring system as follows;
Ec lthy and Supportive, Safe, Well-Kept
an
30 o Island: A Thriving; Hea
d Inspiring Island.
EoI and LTP2 25
Sustainability 20
Political acceptability 15
Affo cost 20 rdability and
Val ue for money 15
Com mercial appetite 10
Env l 15 ironmenta
Project deliverability 15
Man 10 agement of risk
Innovation and improvement 10
Sta 15 keholder impact
Total 200
T by the
p The scores
ascribed to the different options are summarised below, full detail is in appendix
6
he appraisal was carried in a series of workshop sessions and reviewed
roject team. Policy experts were used to challenge assumptions.
.
B - 89
Option
Description Score Risk Evaluation
1
royed ’s
in the risk profile of the
Do Minimum: continue with current levels of expenditure and small amounts of capital investment to maintain network in its current condition
0 Substantial sunk costs (project costs) with no benefit. Significant reputational impact as the expectation which has been built is destand leading to questioning of the councilability to deliver on strategic projects. No improvement network.
2 Strategic network PFI including on-going maintenance but no capital
75 Continuing deterioration of the lower status routes and pathways.
pec ons not met)
Failure to maximise opportunity to regenerate tourism.
works on the unclassified network
Reputation impact (ex
tati
3 k PFI including nce and
king
134 Increased congestion. Potential for conflict between Parking Services and/or the enforcement contractor and the PFI contractor. Loss of potential cost savings (maintenance of car park surfaces coulundertaken at marginal rather than full cost).
Full networon-going maintenastreet cleansing but excluding on/off street car parservices
d have been
4 cluding nce but
king
107 Increased congestion. Potential for conflict between Parking Services and/or the enforcement contractor and the PFI contractor. Potential for conflict between street cleansing operation and PFI contractor (bin provision,
nce
undertaken at marginal rather than full cost).
Full network PFI inon-going maintenaexcluding street cleansing and on/off street car parservices
street/gully cleansing) Loss of potential cost savings (maintenaof car park surfaces could have been
5 Full network PFI including on-going maintenance, street cleansing and on street car parking services but excluding off street car parking services
127 Potential for competition for parking revenue between PFI contractor and off-street parking operation. Risk of loss of potential redevelopment opportunities presented by off-street car parks.
B - 90
Full network PFI including intenance, street d on/off street
163
n the Council finding a
6on-going macleansing ancar parking services
Option is reliant ocapable PFI partner to deliver the full scope.
7
uding
et car parking services
116 Increased congestion.
ce
n at marginal rather than full cost).
n ays.
of way maintenance
Full network PFI including on-going maintenance and
clstreet cleansing but exts of way andpublic righ
on/off stre
Potential for conflict between Parking Services and/or the enforcement contractor and the PFI contractor. Loss of potential cost savings (maintenanof car park surfaces could have been
ndertakeu Differential standard of maintenance betweerights of way and highw Risk of further deterioration of the rights of way network which would impact other strategic objectives (health and well-being etc.). Increased cost of rightsas a stand-alone operation. Lack of clarity of definition between an urbanpath and a rural right of way
8 Full network PFI including street cleansing but excluding any life cycle
46
orcement contractor
ather than full cost)
capital replacement and on/off street car parking services
Increased congestion. Potential for conflict between Parking Services and/or the enfand the PFI contractor. Loss of potential cost savings (maintenance of car park surfaces could have been undertaken at marginal r Risk of deterioration following the rehabilitation phase and poor standard of network on handback. Reputation impact as the condition of the highways deteriorates back towards the pre-existing standard.
B - 91
we prais d relative to the Do Minimum, which
. Option 6
hest score. Optio
st s, ex on or off street
hts of way.
FI with a full ran fore identified
ferred option.
The Economic Case for the preferred opt
makes use of standard DfT approaches a
The Economic Case presents a mix of
derivation of which is described below
Appraisal Summary Table.
3.3 Service Improvements and CommuThe table below relates different serv
benefits they will generate. The princip ng from
ad faces esistance and
g. The principal im acts flowing from the PFI will be time
ces, savings in
levels of street crime and disorder and
fficiency gains.
Benefit item Better road
improved s
resistance
The Do Something options re ap e
, a full network PFI with a full range of
ns 3, 5 and 7, which all had similar
therefore has a minimum score
services, had the hig
scores and were the next be option cluded combinations of
parking services or public rig
Option 6, a full network P
as the pre
ge of services, was there
ion follows a NATA style appraisal and
nd values where possible.
quantified and qualitative impacts, the
with the findings summarised in an
nity Benefits ice improvements to the community
al service improvements flowi
the PFI will be better ro sur with better skidding r
p
vehicle operating costs, reductions in
improved street lightin
savings from several sour
the number of accidents, reduced
general e
surfaces and
kidding
Improved street lighting
Time savings from higher
traffic speeds
Time savings from fewer
road works and road
closures
Vehicle operating cost
savings
Reduced numbers of
B - 92
accidents
Reduced public liability
payments
Reduced street crime and
disorder
Time savings from
removal of weight and
width restrictions
Efficiency savings from private sector involvement
Efficiency savings from undertaking the right
options
h benefit item is set out below and full detail is in
ppendix 7.
applied for the remaining 18 years. This profile is
taken into account in the estimates made below in the assumptions about the
‘ramp-up’ of benefits through
closures over the CIP and the
In i of the Island’s road network has been
de e highway condition model operated for the Isle of Wight
Co tify the schemes needed to bring the Island’s
roa o standard and the costs of those schemes. A recent
run of the model has shown that maintaining expenditure at around current
lev itio f the road network is broadly maintained at
today’s level. We are therefore adopting this model run as representing our Do
Mi
The basis for estimating eac
a
The Isle of Wight Highways PFI is expected to be a 25-year concession starting
in early 2013, so benefits are calculated over the 25-year period from 2013 to
2037 inclusive.
Over the first seven of the 25 years there will be a 7-year Core Investment
Period (CIP) to get the network up to a defined standard, with life-cycle
maintenance then being
the CIP and the volume o
following 18 years.
f road works and road
recent years the cond
teriorating. Th
tion
uncil allows the council to
ds and footways up t
iden
els will mean the cond n o
nimum.
B - 93
3.3.1 Time savings from higher traffic speeds as a result of better road co
Ru highway condition model have been undertaken for the Do
Mi Do Something. The sc es needed to get
fro Minimum to a Do Something are phased over seven years – with
the worst NI score road sections being undertaken first.
It is generally believed that traffic speeds are constrained on sections of road
wit As se sections of road are improved from the Do
Mi , speeds and journey reliability will improve and
time savings will be generated. Our central estimate assumes that speeds
thr roads of poor quality will increase by 2 mph (3.2 kph).
The Island’s road network has been divided into four categories of road based
fit from an improved road surface on roads
in each category:
nditions
ns of the
nimum and for the preferre
m the Do
d hem
h poor surface quality.
nimum to the Do Something
the
ough these sections of
on traffic flow, as follows. These values have been used in estimating the
numbers of vehicles which will bene
Category Vehicles per day, AADT
1 >10,000
2 5,000 – 10,000
3 2,000 – 5,000
4 <2,000
s from all the schemes to be
plemented during the CIP are assumed to be built up evenly over the seven
sumed to be slowed down by two minutes – at, say, temporary
traffic lights or in taking a longer, alternative route.
These flows are combined with the kilometres of road in each category to have
improved road surfaces and the central assumed speed change of 3.2 kph to
give estimates of time savings. The time saving
im
years of the CIP then maintained over the remaining 18 years of the
concession.
3.3.2 Changes in travel times from changes in the volume of road works and road closures
Currently there are around 5,000 job tickets for road works on the Island each
year. The average duration of road works is estimated at half a day and
vehicles are as
B - 94
IP, the number of road works might be expected to increase,
or the Do Minimum, the current situation of around 5,000 job tickets per year
chemes would impose an average delay of five minutes on each vehicle
3 e operatiThere is some eviden ularly from the USA, that the poor condition of
roads can substantial operating and maintenance costs. Work
b RIP (The Road I gramme) has indicated that roads in poor
condition can cause additional vehicle costs, from accelerated vehicle
deterioration, additional maintenance needs and higher fuel consumption, of
claims that potholes cost UK road users £320m per year and
since there are 32.4 million registered vehicles in GB this works out at an
he Isle of Wight would mean that the cost on the Island
During the C
adding to delay. From years eight onwards, however, there should be a
substantial reduction in road works and a consequent benefit from reduced
delays.
F
was assumed to continue.
For the Do Something, the modelling of the road network indicated that there
would be some 235 major schemes, with an average duration of three weeks,
undertaken during the core investment period. It was assumed that these
s
affected. It was assumed that the number of job tickets issued for smaller items
of road works would decline steadily over the Core Investment Period and from
year 8 onwards there would be some 500 job tickets issued per year, one tenth
of the current rate.
.3.3 Vehicl ng cost savings ce, partic
ly add to vehicle
y T nformation Pro
around $200-300 per vehicle per year.
The USA is different from the UK in the types of cars that people drive, the
condition of the road network and the extent to which they use their cars, so the
values generated by a USA lobby group may not apply in the UK. In the UK,
Potholes.co.uk
average of around £10 per vehicle per year. We assume that the relatively poor
quality of roads on t
would be higher than the average and have assumed a central estimate of an
additional £20 per vehicle per year.
B - 95
he number of vehicles owned by the Island’s households is recorded as
ced vehicle operating costs.
reases in the summer months. Traffic count data
cross a number of the Island’s roads indicated that summer traffic flows were
T
63,874 cars and vans in the 2001 census. Allowing for growth since 2001 and
the cars, vans, HGVs and buses owned by the public sector, the utilities, the
private sector, bus operators, etc we assume that 75,000 vehicles could benefit
from redu
Common experience, supported by an analysis of traffic counts, indicates that
the Island’s vehicle fleet inc
a
on average around 11% higher than flows in neutral months. This increased
vehicle flow, for a period of four months in the summer, was also assumed to
benefit from a saving in vehicle operating costs.
Summer increase…
3.3.4 Reduction in the number of accidents
he Island’s road accident data for previous years – the three years from mid
to identify the accidents in which poor
ll allow at least a proportion of these and
ther non-fatal accidents to be avoided, depending on the relative contribution
ility payments average around
500,000 per year, though there is considerable variation from year to year. A
major claim, in relation to a fatality for example could push the claim in any year
T
2005 to mid 2008 has been analysed
road conditions might have been a major factor. Over this three year period,
there were 13 fatalities from accidents involving wet shunts and loss of control
where a road’s poor skid resistance might have been a contributory factor.
Over the PFI’s seven year core investment period the skid resistance of the
road network will be improved which wi
o
of poor skid resistance and other factors to these accidents. The council’s
general experience is that the implementation of a road safety measure can
normally lead to a reduction of around one third in the number of relevant
accidents, so we assume that in the completed Do Something option one-third
of these accidents could be saved. Standard DfT accident values are then
applied to the estimates of the reduction in the number of accidents.
3.3.5 Reduction in the Council’s public liability payments The council’s current road-related public liab
£
B - 96
urrent levels of public liability payments
ould be maintained and that this risk will be transferred in the Do Something.
(of the order of 15%-
25%). There might also be an increase in night-time pedestrian and social
ts as a result of increased perceptions of safety and the
ality of life more generally.
g will be improved to new EU
ccidents during the hours of darkness are assumed to be reduced by one-third
considerably higher than this. The council would not be liable for any such
payments if it maintained its proper schedule of road inspections, as we assume
it would in the Do Something.
For the Do Minimum we assume that c
w
3.3.6 Reduction in accidents and street crime as a result of improved street lighting The 4Ps guidance on the estimation of benefits from enhanced street lighting
indicates that benefits might arise from a reduction in night-time accidents (of
the order of 15%-35%) and night-time crime and disorder
activity on well-lit stree
qu
We assume that under the PFI street lightin
standards in the Island’s towns and that some villages currently with limited
street lighting would have street lights replaced to the relevant appropriate
standard under the PFI and that accidents and street crime/disorder will be
reduced as a result.
A
in line with the normal impact of the Council’s road safety-related measures.
Street crime and disorder
3.3.7 Time savings from the removal of weight and width restrictions The removal of weight and primarily width restrictions will benefit heavy goods
vehicle movements. The number of restrictions to be removed from each
category of road is combined with the average traffic flow on each category of
road and the following proportions of HGV in the traffic flow by category of road.
ach affected HGV is assumed to save 5 minutes from being able to take a E
more direct route as a result of the removal of a restriction.
B - 97
Category HGVs as % of traffic flow
1 6%
2 7.5%
3 7%
4 4%
3.3.8 Efficiency gains from two sources – 1) the transfer from public to
re effective maintenance measures because of the
that this efficiency gain is worth 15% of the
xpenditure under the PFI.
fective, higher cost measure with an overall saving in life
ycle costs.
ted
inor repairs have been made to sections of road when the cost effective
a more major road reconstruction which would have
moved the need for future repairs. At Appleford Road, Chale, for example,
d at
private sector management of the road network and 2) being able to undertake moavailability of more funds.
Better value for money can be expected from two different sources under the
PFI. The first source of efficiency gain has been identified generally from
previous PFIs and is generally attributed to the greater incentivisation and
efficiency of the private sector in doing what the public sector had previously
been doing. We assume
e
The second source of efficiency gain arises from the availability of more funding
under the PFI which means that more efficient measures can be undertaken. In
effect, the repeated application of lower cost, less effective measures can be
replaced by a more ef
c
The Isle of Wight Council is able to point to a number of cases where repea
m
solution would have been
re
some £4,300 has been spent on abortive work since January 2007 an
Calbourne Road, Calbourne some £26,000 has been spent since June 2006.
These sums exclude additional money spent on infilling potholes where the
records do not allow the location of the work to be identified.
We assume that such efficiency savings could be worth a further 5% of the
expenditure under the PFI.
B - 98
3.4 Value for Money Assessment (TQAT) The Value for Money assessment is fully described in the financial case, section
5. A detailed public sector comparator and a shadow bid model have been
constructed. Comparing the PFI shadow bid with the Public Sector comparator,
the PFI option is found to 2.3% value for money over the PSC option.
be 1
3.5 NATA The NATA-style Appraisal Summary Table, attached at appendix 8,
summarises a wider-ranging appraisal, covering the economy, safety, the
environment, accessibility and integration.
£ million present
values, 2009 price
The principal quantified benefit estimates are summarised in the table below,
calculated over the 25-years of the concession period and expressed as
Present Values in 2009 prices.
Benefit Item
s
Time savings as a result of better road surfaces 225.9
Time savings from changes in road works and road closures 44.1
Vehicle operating cost savings 23.0
Accident savings from improved skid resistance 26.0
Public liability payment savings 76.0
Accident savings as a result of improved street lighting 74.6
Street crime reduction as a result of improved street lighting [xx]
Time savings from the removal of width and weight
restrictions
23.0
Efficiency savings from private sector involvement 49.8
Efficiency savings from improved road maintenance
measures
16.6
Total £ [559] million
he costs of the Preferred Scheme are detailed in appendix 9 and are
Figures removed for commercial purposes
T
described more fully in the Financial Case. They include un-inflated (2009/10)
costs as follows:
B - 99
£ million
Capital costs over Core Investment Period Figures removed for commercial reasons
Life cycle replacement costs Figures removed for commercial reasons
Operation & Maintenance costs over 25 years Figures removed for commercial reasons
Contract Management Costs over 25 years Figures removed for commercial reasons
Total £588.8 million
Present Value £[365.7] million
The un-inflated costs of the Do Minimum, of maintaining the hi
in
£ million
ghways network
its current condition, are as follows.
Capital costs over Core Investment Period Figures removed for commercial reasons
Life cycle replacement costs Figures removed
for commercial reasons
Operation & Maintenance costs over 25 years1 Figures removed or com al reasons
f merci
Total £374 million
Present Value £216 million
lue terms is [£149.4] million; the benefits
re [£544] million and the Benefit: Cost ratio is [3:3:1].
1 Includes the costs identified as Contract Management Costs in the Preferred Option
The net cost of the PFI in present va
a
B - 100
3.6 Assessment of Funding The PFI credit will make funding available which is not available through
ma e council is currently fu lion
of capital expenditure per year (so around £35 million ov
Period) but capital funding of around £44 million over this period would be
ne dition uld
be needed to bring the network into an acceptable con
make this funding available.
Good value for money would be obtained from this add
the benefit:cost ratio around [3.3:1].
as far the highest scoring option when
appraised against a set of criteria and objectives which draw heavily on the
Island’s strategy as set out in Eco Island Vision 2008-2020 and in its Local
Tra network
cleansing and on and off street parking services.
Th halt the decline in the Island’s roads and to
ensure that the Island’s roads, footways and public rig
part in contributing to the Island vision will only be available through the PFI, our
pre es rce to
do this itself.
3.8 Conclusions
instream council funding. Th nding around £5 mil
er the Core Investment
eded to maintain the network in its current con and £192 million wo
dition. The PFI would
itional expenditure, with
3.7 Preferred Investment / Service Delivery Option The Preferred Option 6 emerged by
nsport Plan. The Preferred Option is a full PFI which includes street
e level of funding needed to
hts of way can play their
ferred service delivery option as the council do not have the resou
B - 101
Commercial Case
al for PFI ublic sector procurement is governed by legislation set by the European Union
otential bidders
• Non-discrimination
Transparency
uality, best value public
r the open advertisement of all opportunities exceeding the published value
n of a PFI service provider.
ommission published Directive 2004/18/EC in the spring of
2004, introducing the Competitive Dialogue (CD) procedure. This mechanism
has been introduced as an alternative to the negotiated procedure for complex
procurements such as the letting of a PFI contract.
4
4.1 Introduction The Commercial Case focuses on the key areas of the procurement strategy
and process, commercial considerations, soft market testing and the human
resources implications of the project. Risk has been considered within the
context of the Commercial Case although this is dealt with in more detail within
the Management Case. 4.2 Procurement AppraisP
mandating three core principles:
• Equality of treatment between all p
•
Effective procurement is crucial in securing high q
services and the Government has highlighted that the development of a clear
procurement strategy is a key step towards achieving Value for Money and
delivering the demanding efficiency targets.
The process requires use of the Official Journal of the European Union (OJEU)
fo
thresholds as will be the case in this project.
It is mandatory for the council to comply with these regulations and also council
Standing orders; therefore a compliant procurement mechanism will be utilised
for the selectio
The European C
B - 102
taking OJEU procurements:
• The Open Procedure – whereby any organisation expressing an interest is
ull contract documentation and invited to tender. This
•
ontract negotiation using this mechanism.
• The Competitive Negotiated Procedure – which allows the Council to pre-
to negotiate over the required service
the Council pre-qualifies
reate a shortlist of those who are invited to participate
rocess, affording them opportunity to discuss and refine the
required solutions. Once the solution has been confirmed the dialogue is
x contracts” (ref: Regulation 18 -
ublic Contracts Regulations 2006).
ct can be classified as a “particularly
omplex contract”. The Council is not able to objectively define the technical
4.3 Procurement Process The Council will follow the following procurement process and timescales:
Four regulated mechanisms exist for under
provided with the f
method does not include any opportunity for short-listing or contract
negotiation.
The Restricted Procedure – which allows a pre-qualification stage to be
performed to short list the suppliers that will be invited to tender. Again no
opportunity exists for c
qualify suppliers that will be invited
provision. There is no formal end to the negotiations prior to the contract
signature.
• The Competitive Dialogue Procedure – whereby
service providers to c
in the dialogue p
brought to a halt through formal notification to all participants and final
tenders are invited. After the Call for Final Tender has been issued only
limited discussion and clarification is allowed – there is no provision for
further negotiation at this stage.
Guidance states that the Competitive Negotiated Procedure should now only be
used in exceptional circumstances, whilst the Competitive Dialogue procedure
should only be used for “particularly comple
P
Under the Public Procurement Directive (2004/18/EC) and the Public Contracts
Regulations 2006, the proposed PFI contra
c
means capable of satisfying its needs or objectives and therefore the
Competitive Dialogue procedure is the mandated process.
B - 103
The key stages of the Procedure can be defined as below; [The OBC
submission is 2 months ahead of scheduled and is likely the timescales
below will be brought forward by 2 months, subject to DfT and HM
Treasury approval.]
a. Post OBC to Pre Dialogue (September 2009 to May 2010)
• Planning and initial preparation (pre OJEU notice) – commencing
following submission of OBC.
• OJEU contract notice (see draft attached at appendix 10) for short-
listing of bidders through the use of a Prequalification questionnaire
loutions.
luate outline solution
• Invite detailed solution and evaluate
efine solution
• Selection of bidders and preparation for the dialogue stage – agree a
shortlist.
b. Dialogue Phase (June 2010 – October 2011)
• The dialogue – issue invitation to submit outline so
• Eva
• Invite final dialogue and r
• Close CD.
B - 104
c. Post-dialogue Phase (October 2011 to November 2012)
• Submission of Final Tenders and Bid Evaluation
• Bid Clarification
• Preferred Bidder to Contract Close
• Final Business Case to DfT and HMT.
• Cabinet Approval
• Financial Close
4.4 Competitive Dialogue (CD) The CD process is likely to be longer than the negotiated route and more
resource intensive. The council is keen to minimise bid costs and will keep this
in focus when drawing the Project Agreement and will work with bidders to
achieve this. The council itself has made considerable investment in assembling
a post-OBC team structure described in the Management section of this OBC,
including full time Legal and Procurement support. In addition, the Programme
Director will be able to draw on the wider Advisor team, also identified in the
mana
The c
and ground rules to facilitate an orderly conduct of the dialogue. The process
will be co-ordinated and managed centrally.
w session followed by dialogue conducted
E e
Post ISDS through to CFT, the same methodology will be used except that
l, Financial and Legal.
uration of
necessary to undertake this
nd the financial commitment necessary to bid and the
likely investment in time necessary to bring a successful conclusion to the
gement section.
ouncil will design detailed CD process and announce a set of protocols
The council expects the early dialogue up to ISDS to be conducted on a two
eekly rotation, with a plenary opening
by two teams – one leading on technical and the other on commercial/legal.
ach dialogue team will have a back room support team to help with th
effective management of the overall process.
three dialogue teams will be set up – leading on Technica
Each dialogue team will also have a back room support for the full d
the dialogue.
Experienced bidders of the size and shape
Contract will understa
B - 105
procu s that the
fully appreciative of
on minimising bid costs.
ets the authority is approaching
ng full account of the opportunities for innovation
hich are available from working with others in the
public tary sectors. Importantly, this strategy seeks to balance
Evaluation Criteria for each of the
tages with the full scoring methodology before commencing CD. The Council
• Financial
rement process. The Council’s soft market testing indicate
market is fully aware of the resource implications but will be
any client body that focuses
In order to achieve best value and efficiency targ
the competition positively, taki
and genuine partnerships w
, private and volun
two priorities:
• delivering efficiencies and quality
• sustainable procurement, engaging with local and regional suppliers
to promote the local economy taking into account the social and
environmental impact of spending decisions
4.4.1 Evaluation Criteria
The council will determine the detailed Evaluation Criteria once the full
specification is developed. It will publish the
s
intends to publish an affordability NPV envelope for bidders to use as a guide to
prevent abortive work being undertaken. The following may be included when
forming the basis of the Evaluation criteria:
• Technical
• Legal
• Payment Mechanism
• Staffing
• Resourcing
Detailed Evaluation Criteria will be determined through a series of project
workshops and will be tested for robustness before formally adopting them for
evaluation.
B - 106
sis of a workable scheme
pecifically adapted to particular local needs. The council’s service
set out in appendix 11. These standards have been tested for
appropriateness for Isle of Wight conditions and affordability. In costing the
e activities under an output based
practices,
• Existing output specifications on other highway and lighting PFI projects
• Current best practice across other Local Authorities
• Well-maintained Highways – Code of Practice for Highway Maintenance
Management
way Structures – Code of Practice, UK Bridges
will necessarily be closely aligned with
ds for litter and detritus grading will be set at the
rd, and for graffiti and flyposting at grade A. The
Service Provider will be required to co-ordinate and programme its works with
e council, that this requirement is being met. It is expected that
4.5 Output Specification The council has drawn on the experience of other Authorities that have
procured Highways PFI projects in formulating the ba
s
requirements will be set out in detail in the output specification based on 4ps
guidance – the first draft of this document is being prepared at present.
The council has set a number of standards for each highway asset category,
and these are
effects of delivering operation and maintenanc
PFI specification, the Council has taken account of meeting the standards,
and obligations, contained in the following documentation:
• Management of High
Board
• Well Lit Highways – Code of Practice for Highway Lighting Management
• Code of Practice on Litter and Refuse, Defra
• DfT design manuals
• Highways Act 1980
• The New Roads and Street Works Act
• Traffic Management Act
• IWC internal Policies
Core services relating to highway assets
industry standards. Standar
COPLR intermediate B+ standa
any contractor with responsibilities for waste collection management on the
Project Network and shall be able to demonstrate from time to time, at the
request of th
B - 107
within the normal scope of the service providers
B.4 –
ighting Classes for Subsidiary Roads (pedestrians and cyclists)).
this interface will be well
current duties on other Networks.
The lighting requirements for lighting on subsidiary roads and associated areas,
footpaths and cycle tracks will be determined based on crime figures, traffic flow
and environmental criteria as set out within BS5489-1: 2003 (Table
L
Lighting Class Crime Rate
Ra value Area ID Area ID Area ID
Low traffic flowa
Normal traffic flowb
High traffic flowc
E1/E2d E3/E4d E1/E2d E3/E4d E1/E2d E3/E4dLow Ra<60 S5 S4 S4 S3 S3 S2 Ra≥60 S6 S5 S5 S4 S4 S3 Moderate Ra<60 S4 S3 S3 S2 - S1
Ra≥60 S5 S4 S4 S3 - S2 High Ra<60 S2 S2 S2 S1 - S1 Ra≥60 S3 S3 S3 S2 - S2
Lighting Classes for Subsidiary Roads (pedestrians and cyclists).
The lighting class appropriate for each type of traffic route within the IW shall be
fic flow and environmental
out within BS5489-1:2003, Table B.2 – Lighting
d Traffic routes and Table B.3 – Lighting Classes for
ion the appropriate lighting class for each
town/district centre within the IW shall be determined based on usage, traffic
Type of Traffic
determined in accordance with the road type, traf
criteria selection process set
Classes for Motorways an
Conflict Zones.
Within the Output Specificat
flow and environmental criteria as set out within BS5489-1: 2003.
Lighting Class
Normal Traffic
Flow High Traffic
Flow
E3 E4 E3 E4
Pedestrian only CE3 CE2 CE2 CE1 Mixed vehicle and pedestrian with CE2 CE1 CE1 CE1
B - 108
separate footways Mixed vehicle and pedestrian on same
rface CE2 CE1 CE1 CE1
su
L
ach car park
ithin the Isle of Wight shall be determined based on usage and traffic flow
set out within BS5489-1: 2003
ighting levels for town centre areas as extracted from BS5489
Within the Output Specification the appropriate lighting class for e
w
criteria as
.
Lighting lev car pa 9
ontrolle
nd the output specification will contain a standard whereby no traffic signal
h Standards, NJUG guidelines, local authority best practice,
nd trade association recommendations.
• The high level requirements of the council for each aspect of the Service
ed Outcomes’
• The performance requirements of the er gainst
the Service Delivery Outputs and their correspon Performance
Targets
the Payment Mechanism and Service Performance
els for outdoor rks as extracted from BS548
The Council has accurate installation dates for its traffic signal c r assets
a
controller shall be more than 10 years old after the core investment period and
no more than 8 years old at Handback.
Arboriculture and grounds maintenance standards will employ relevant statutory
legislation, Britis
a
Each component of the detailed Output Specification will be drafted to provide:
as ‘Requir
Service Provid , measured a
ding
• Clear “Clause” links to
Schedules
B - 109
sm by which the Output Specification shall be measured in
P ure t o th ject
reement
he Technical and Financial modelling has applied market rates to the costs of
elivering these standards of service and taken account of scale, continuity and
he council’s Highways PFI Contract will be an output based service contract
designed raise the standard of service through efficiency gains in the delivery.
Service payments will be based on either meeting milestones or Output
Specification requirements and hence the contract documents will have detailed
outcomes and key performance indicators for each aspect of service delivery.
The council will adopt the model standard form framework but will devise its
d specific issues,
y, carbon footprint, night working and restrictions on refurbishing
l dates for tourism. The council
Period
– PS1(b) Life cycle
PS3 Environmental Maintenance Service
PS5 Emergency Responsiveness
– Traffic Management, Network Integrity Inspection, UTC,
ct Management and Customer Interface
• The mechani
accordance with the Monitoring
Ag
roced s se ut in e Pro
T
d
private sector operating efficiencies. 4.5.1 Performance Requirements T
own detailed specification, post OBC. This will include Islan
sustainabilit
certain parts of the network during certain critica
will follow the following Performance Standards (PS) model form as a guide:
PS1 Network and Infrastructure Condition
– PS1(a) Core Investment
– Series of Milestone Targets
PS2 Network Performance
– Operation & Maintenance
PS4 Winter Maintenance Service Operations
– Civil & Highway Emergency
PS6 Safety Performance
– On-going Improvements
PS7 Network Management
Fault Management
PS8 Contra
B - 110
ic Assistance
– Strategic reporting responsibilities, Best Value Duty in the
– Compliance with Authority's Working Practices, Codes of
luntary Codes
of
the Project Agreement include: the Streetlighting Model Contract (due to the
numb ntenance PFI projects already
dealt with in this Model Contract); the Standardisation of PFI Contracts versions
4 ("SoPC ement Procurement Pack issued earlier
this year tracts.
Initial legal Piper and WSP (the Council's
technical ad s on certain key issues
for inclu
sector from t ct and the Sheffield
Highways Maintenance ke advantage of this
knowledge he sector.
The Co to adhering to the drafting
conta r, there are likely to be a number of sector-
specific
in the main, nce project rather than a design and
build e advantage of the
– Annual Service Reports, MIS, Inventory, Customer
Services
PS9 Strateg
delivery of the Service, Gershon efficiency, Audits, LTP
assistance, Service Improvement Plans
PS10 Working Practices
Practice and Vo
The Output Specification and Performance Requirements will link to the
Payment Mechanism detailed at 4.7 and all three documents are dependent on
one another in determining the PFI contractor’s performance and payment. The
Project Agreement will also be fully cross referenced to the Output Specification
and Payment Mechanism ensuring a cohesive suite of Contract Documentation.
4.6 Project Agreement The Council is currently developing a draft Project Agreement with its external
legal advisers, DLA Piper. The precedents being used to inform the drafting
er of analogous issues relating to the mai
4"); the draft Highway Manag
by 4Ps; and other relevant highways con
meetings have been held with DLA
visers) to discuss and reach agreed position
sion in the Project Agreement. As DLA Piper has experience of this
he Birmingham City Council Highways PFI proje
PFI project the council is able to ta
on all key issues within t
uncil is committed, wherever possible,
ined within SoPC4. Howeve
derogations for which approval will be sought. These derogations arise,
because this is a maintena
project. The Council will, wherever possible, tak
B - 111
lessons lear
and Sheffield project any derogations it proposes to SoPC4 drafting.
The C list of derogations from SoPC4 which it will
frequent
confirm the
of legal mee el summary of the
derog it currently expects to seek on the project which
is set out a
The drafting of the Project Agreement will be completed prior to the start of the
payments to the contractor will vary according to agreed standards, measured
es.
nt on any sector-specific derogations approved in the Birmingham
s to inform
ouncil will keep a running
ly review as the drafting of the Project Agreement is developed to
necessity of any such derogations. Following on from the initial set
tings, the council has provided an initial high lev
ations from SoPC4 which
t appendix 12.
procurement process and will be made available to bidders at the
commencement of procurement.
4.7 Payment Mechanism It is presently envisaged that the payment mechanism will be based on a
Unitary Charge for the delivery of the key elements of the Highway service,
in accordance with pre-set rul
The Council will develop the Payment Mechanism to:
• Incentivise the contractor to deliver to required standards, timetable and
project objectives
• Encourage the contractor to extend asset lifecycle through the use of
innovative design and new technology
• Be bankable
• Be objective, clear, simple, cost effective and capable of measurement.
The approach will build on the experience of the previous projects in the
highway maintenance sector and from key guidance from the 4Ps and HM
Treasury.
In keeping with practice on earlier projects, performance during the CIP will be
measured through achievement of milestones. The initial level of Unitary
Charge will reflect the total contract value less the value of core investment
works. As each milestone is achieved, the Unitary Charge will step up in
B - 112
PS1A of the standard form relates to the CIP, the performance of which is
astructure Condition-PS1(b) Life cycle
eness
mance
• S8 Contract Management and Customer Interface
ctices
us projects in the sector included
gainst each service delivery criterion of the performance
k
position, but considers that there will be some merit in exploring the benefit of a
part from simplifying the application and monitoring of the payment
service delivery criteria.
increments set to make the Unitary Charge reflective of the total contract value
on completion of the CIP.
It is intended that Service Provider performance will be measured against the
service delivery requirements of the Output Specification for each of the
performance standards of the model standard form. These will be appropriately
modified to reflect the service and network conditions of the Island.
monitored and paid for through the milestone mechanic outlined above. The
following performance standards will be monitored against service delivery.
• PS1 Network and Infr
• PS2 Operation & Maintenance
• PS3 Environmental Maintenance Service
• PS4 Winter Maintenance Service Operations
• PS5 Emergency Responsiv
• PS6 Safety Perfor
• PS7 Network Management
P
• PS9 Strategic Assistance
• PS10 Working Pra
Some payment mechanisms used on previo
bespoke deductions a
standard, albeit with some banding. The Council will retain this as a fallbac
simple hierarchy of deductions related to the impact of the performance failure
which would apply to all service delivery criteria.
A
mechanism, the common hierarchy approach may allow the introduction of a
small set of Key Performance Indicators into the Payment Mechanism. These
would allow the Council to include some overarching aggregate performance
requirements in addition to the disaggregate requirements of the individual
B - 113
nce will be largely self monitored with a requirement
r independent review and approval by third party on a random sample of
he interface with other contractual remedies will also be carefully considered.
that
all three documents are dependent on one another, when determining the PFI
12. The Council will update
intends to work with DfT and PUK
re that the approval for derogations can be
4.9.1 Wharf facilities
orts of gravel, aggregates and
ther bulk cargos. Medina Wharf has direct road access on to the main highway
Service Provider performa
fo
indicators. The approach to be adopted will be based on irregular and random
sampling but, to incentivise accurate self monitoring, payment deductions for
inaccurate or false reporting will be high.
T
The Payment Mechanism will be closely integrated and calibrated in line with
the Output Specification and Performance Monitoring Regime, to the extent
Contractor’s performance and payment.
4.8 Derogations from SOPC4 An initial derogations table is attached at appendix
the table as and when necessary and
throughout the procurement to ensu
obtained in a timely manner.
4.9 Commercial Issues
There are three operating commercial wharfs on the Island, all on the Medina
estuary off the Solent.
The main wharfs are Medina Wharf in Cowes, and Kingston Wharf in East
Cowes, both of which currently accept regular imp
o
network via a specially constructed link road. Kingston Wharf is due to have
access to the main road network via a new road link through a proposed
employment development area, due for completion at the end of 2009. On
average (between 2003 and 2008) 72,500 tonnes of stone and 102,000 tonnes
of shingle and ballast per annum were imported to the Island through Cowes
Harbour.
B - 114
he smallest wharf, Blackhouse Quay, is in the built up heart of Newport.
4.9.2 - Isle of Wight Mineral Background
halk, and 1 limestone (producing crushed rock). These are distributed across
ut the Island, with the main centre for
rocessing being located just to the south east of the capital town, Newport.
e arry out some form of material recycling.
signated for their (European, national, or local)
ignificance for nature conservation interests (i.e. wildlife and habitats). Other
ccess, existing development and allocations.
ating to the Island Plan and Mineral Planning Authority
ill be held in the Project Data Room.
onsiderations ntil the Highways PFI Provider is identified IWC will not be in a position to
cil has developed an in-depth understanding of the potential service
providers through both the completion and planning of tasks including;
T
Although road access is restricted adjacent to the site, and leads onto an
industrial estate road before reaching the main road network, the wharf still
accepts occasional cargos of gravel for local distribution, but access by sea is
limited by a narrow tidal window and relatively shallow waters.
The Island has a number of currently active quarries: 5 sand and gravel, 3
c
the Island on a predominately east/west axis orientation, following the
geological occurrence of economically significant reserves. The locations of all
of these quarries can be considered rural (i.e. outside development envelope
boundaries) and they are spread througho
p
Ther are currently 3 quarries that c
There are a number of environmental constraints to mineral operations, bearing
in mind that extraction is limited to resource occurrence including major chalk
aquifers, AONB, and sites de
s
physical constraints include a
Further information rel
w
4.9.3 - IWC Property CU
determine which, if any, of the currently held highways related Isle of Wight
council sites might be of interest to that Provider, and how they might be
transferred. However, in order to ensure that all prospective Providers are able
to consider the issue of council held properties a schedule of such properties
will be held in the Project Data Room.
4.10 Market Soundings/Market Interest The Coun
B - 115
d the Council to
potential service providers, encouraging interest and participation.
e
otential service providers to the Isle of Wight and our project. The Industry
with
e Council. As well as presentations giving information about the Isle of Wight,
eo to provide an overview of the Island,
e highways condition and give a flavour of some of the residents and visitors’
sual demonstration of some of the good
be a world-leading company in its field,
and also that the Isle of Wight is a place where potential bidders can do, and
ill want to do, business.
• Market research
• Market warming on both formal and informal mechanisms including face-
to-face meetings and the publication of a Prior Information Notice in the OJEU
(see appendix 13)
• A series of industry days to “sell” both the project an
Soft market testing was undertaken as part of the EOI process and this has
continued to date (see appendix 14). There has been a great deal of interest
shown by the Industry and suggestions from regular meetings have helped
shape the scope outlined in the OBC.
An Industry Day on the Isle of Wight will be held on 3 September 2009 at the
Royal Yacht Squadron, Cowes, Isle of Wight. The results of this will be
appended to the OBC in due course. The Industry Day is intended to introduc
p
Day will be led by the Leader of the Council and the Chief Executive. The
Programme Director will outline the scope and approach the Council will take in
seeking a PFI partner for the Council. The Technical Manager and the
Commercial Manager will cover detail aspects of the Project and there will be
an opportunity for prospective bidders to raise issues on a one to one basis
th
our challenges, our vision for the project and the process through to contract
commencement, there will a short vid
th
views about Island roads, including a vi
and bad areas. This will be supplemented by a bus tour of some of the roads
and assets around the Island to further illustrate the rural nature of the Island,
the current state of our network and the logistics of what the project entails.
Additionally, the Council intends to demonstrate that it is a partner capable of
doing business with what will inevitably
w
4.11 Procurement Data
B - 116
ss once it receives the formal approval to proceed from DfT
shed on the
ouncil’s website.
through the procurement process. The
ouncil has comprehensive records of our Inventory and asset condition. These
ise
e need for bidders to travel to the Isle of Wight. Bidders will however be
In preparing both the EOI and OBC the following key assumptions have been
The Council will continue the soft market testing process beyond the Industry
Day to ensure any queries raised are addressed. The Council will enter the
Procurement proce
and the HM Treasury Project Review Group. A draft copy of the OJEU Contract
Notice is attached at appendix 10. A copy will also be publi
C
The Council will set up an extranet system to support the procurement phase of
the Project. The extranet system will act as the virtual data room and will
provide information to the Bidders
C
will be available to the bidders through the extranet. The Council also has
digitised maps in the GIS format; these will be made available on the extranet.
All documents that are on the extranet will also be available in the Project Data
Room. There some old construction drawings, paper maps and other historic
records; these will be listed on the extranet but available for review in the
Project Data Room.
4.12 Encouragement of Competition In order to ensure a sufficient number of bidders to achieve a successful
Competitive Dialogue process, we have included as broad a scope as we feel is
relevant to the Isle of Wight project, although this can be refined as the
Competitive Dialogue progresses and dictates.
In order to minimise early bidder costs and thereby have a reasonable number
of initial bidders, the Council have aimed to set a realistic timetable for
achieving the various stages of the CD process (see 6.5.1) and intend to hold
meetings in London, or other mainland locations where appropriate, to minim
th
encouraged to come to the Island to verify the nature of the assets for
themselves and discuss other matters as they require.
4.13 Bankability
made:
B - 117
The project will attract bidders. The Council is taking measures to ensure that
vide the finance for PFI projects to go ahead, has provided
degree of confidence that money will be available for projects that are
•
this is the case as evidenced above. In addition, the market research
undertaken to date, evidenced at 4.10 indicates a strong commercial interest in
this project.
• Availability of bank funding. The Treasury statement that, if necessary the
Government will pro
a
currently in or near to commencing procurement. In addition, with a Contract
Close for this project not due until late 2012, it is likely that there will be a very
different economic climate at that time and IWC has been encouraged by recent
projects closing without the need of funding from HM Treasury. Further
discussion on this is covered in the Financial Case.
4.14 TUPE
Given the current scope of the project, we anticipate the transfer of XXX staff
which amounts to a release of a payroll obligation of £*******.
tain a core group of staff who will take
ill be offered the opportunity to enter into a service level
nt or transitional basis to ensure continuity for transferring staff is
aintained.
The Isle of Wight Council proposes to re
responsibility for the management and oversight of the contract and maintain
the residual functions. This will ensure that the Isle of Wight Council can monitor
delivery, services and outputs. Further detail on the management of the contract
is set out in the following section.
The transfer of staff will take place in accordance with the Transfer of
Undertakings (Protection of Employment) Regulations 2006 (“TUPE”)
The council is committed to open and transparent communications with staff
and unions ensuring a good working relationship and therefore has produced “A
Basic Guide to TUPE” which will be shared with all staff who are eligible to
transfer. A copy of this guide is attached as appendix 15.
The new provider w
agreement with IWC’s Payroll, HR and Legal departments either on a
permane
m
B - 118
e Council's position and the process for such a situation can be
und in the document marked at appendix 16.
tment whose principles are
et out in “Assessment of broad comparability of pension rights, Statement of
practice by the Government Actuary, May 1999” which is attached at appendix
intaining a list of
urrent contractors to monitor any legal implications that the PFI will have on
schools
s to develop skills.
he Council is committed to ensuring that Equality and Diversity and Health and
the organisations practice.
The Council's pension fund administrator has considered the position should a
bidder choose to apply for admitted body status in the LGPS. A detailed
account of th
fo
However, in the event that the successful bidder does not enter the LGPS,
under the terms of TUPE they will be required to offer a pension broadly
comparable to the council’s Local Government Pension Scheme.
Broad comparability relates to the protection of transferring employees’ future
pension rights. Assessment of whether a scheme is “broadly comparable” falls
within the remit of the Government’s Actuary Depar
s
17.
As well as the council’s staff considerations the Council is ma
c
these and to ensure that businesses are notified of any implications on them
upon which they will need to seek independent advice. In addition, where
potential TUPE implications arise, the council will facilitate contact between
contractors and the successful bidder for the PFI to ensure a smooth transition
is guaranteed.
The bidder will be required to demonstrate a commitment to developing
apprenticeship opportunities through joint working with Island-based
and college
The Council has successfully conducted TUPE transfers in the past with no
ongoing obligations.
T
Safety issues are paramount in its own and its partner’s practices. As part of the
council’s pre-qualification process, we thoroughly check all bidders’ diversity
and health and safety policies and ensure that these are in place and
embedded in
B - 120
Financial Case
5.1 Introduction The purpose of the Financial Case is to establish the financial justification for
the project. It provides the basis for building the base costs; the assumptions
and the methodology for calculating PFI credits and Unitary Charge; the
Council’s own affordability position and the calculation of the Public Sector
Comparator. Finally, it sets out the case for proceeding with the PFI
procurement by demonstrating Value for Money.
5.2 Costs The key cost elements for the project to deliver the services that are required
can be classified under Core Investment Period (CIP) costs, Lifecycle
replacement costs, Operational and Maintenance costs, and Contract
Management costs. The scope of services and the approach to determining
costs reflects an integrated service delivery across the Island that would form
the basis of the Output Specification when going out to tender.
WDM, our engineering consultants, have undertaken Condition Surveys to
estimate the backlog of repairs required to bring the Isle of Wight network up to
current acceptable standards. The detail of their cost modelling exercise is
provided at appendix 2).
IWC staff, who are specialists in their own area, have considered the
requirements to bring other project assets up to acceptable standards and these
costs, together with the WDM costs above, have been fed in to the Technical
model appendix 9 for verification and then submission to the Financial Advisers
for financial modelling.
The base costs (real, un-indexed) over a 25 year period are:
• Core Investment Period (7 years) Figures removed for
commercial reasons
• Lifecycle costs (18 years) Figures removed for commercial reasons
5
B - 121
nance (25 years) Figures removed for
commercial reasons
• Contract Management Costs (25 years) Figures removed for reasons
ificant disruption to Island
residents and also tourists and others that visit the Island. The detailed rationale
is supported by the results of Council’s Island-wide traffic model, the
• Operation and Mainte
commercial
5.2.1 Core Investment Period (CIP) IWC tested the CIP costs for a 5 and 7 year period and concluded that, from the
Island’s perspective, a 7 year CIP was optimum to facilitate a smooth
rehabilitation programme without causing sign
behind this
results of which are in appendix 4 and is supported through the traffic model
analysis described.
A summary of the CIP costs is provided below:
Figures removed for commercial reasons
Capital - Core Investment - Scenario 1 Hierarchy 1 Network Hierarchy 2 Network Hierarchy 3 Network Hierarchy 4 Network Scrim Treatments Kerbs/Channels - Costed Separately Footway Network Street Lighting, Signs, Bollards Street Furniture - Non-Illuminated Signs etc. Safety Fencing Drainage Traffic Signal Rehabilitation Bridges & Structures Rural Rights of way including associated Cycleways Environmental Measures Major Capital Works (Bouldnor) Cowes Ferry Replacement Wharfage Costs Car Park Resurfacing CCTV Annual Total 155,863,067 5.2.2 Lifecycle, and Operations and Maintenance Costs
B - 122
:
A summary of the Lifecycle (18 year) and Operation and Maintenance (25
years) costs is provided below
Figures removed for commercial reasons Life Cycle Replacement - Scenario 1Hierarchy 1 NetworkHi rarchy 2 & H3 Network - Combined
archy 4 Network - Halcrow Highlight Note
r Parking Meters
185,250,937
eHierHierarchy 1-4 ResurfacingScrim Treatments - Inclusive on H1-4 Resurfacing?Kerbs/Channels - Costed SeparatelyFootway NetworkStreet Lighting, Signs, BollardsStreet Furniture - Non-Illuminated Signs etc.Safety FencingDrainageTraffic Signal RehabilitationBridges & StructuresRural Rights of way including associated CyclewaysEnvironmental Measures
r Park ResurfacingCaCaCCTV RenewalsAnnual Total
sons
Figures removed for commercial rea
Operation & Maintenanceaintenance
Walls/Embankments To be provided by IWC
cerass Cutting / Environmental works
o. To be provided by
nanceiated Cycleways
- provided by IWC167,641,050
Carriageway Routine MStructures/RetainingStreet Cleansing - Pending Further Info.
itching, quartering)Drainage (gullies, dTraffic Signs / Plates Traffic Signals MaintenanceStreet Lighting MaintenanceWinter MaintenanHighway GInspectionsCondition SurveysOn/Off Street Car Parks - Expenditure pending futher infIWCCowes Ferry - Operations & Mainte
assocRural Rights of way including etered EnergyMetered & Non-M
Annual Total
.3 Shadow Bid Model
e cost of that work
meet the council’s required standards, under a PFI delivery model. The
model seeks to replicate the cost that the council and its technical advisors
5
The Shadow Bid model estimates the work required, and th
to
B - 123
of the project and the proposed risk allocation
account the current state of the
economy and its impact on funding markets.
The key output of the Shadow Bid model is the Unitary Charge calculation,
which is then used for estimating the project’s affordability. The Unitary Charge
(UC) is based on a base case assumption of tighter market conditions being
prevalent at the time of financial close, as opposed to what has been extant in
the past few years, and also takes in to account the commercial terms that
equity providers will want to see.
UC for Affordability
Calculations First Full Year Year 8 Year 25
believe would be proposed in a commercial bid from potential bidders for this
project, given the requirements
developed to date. The model takes into
£22.7m £42.7m £61.35m
the best estimates on information
available, sensitivities have been undertaken to determine the impact of
changes in the funding market; these are discussed in a 5.4.4.
5.3.1 Shadow Bid Costs The Shadow Bid costs, which are the key technical inputs into the Shadow Bid
Model, have been developed to take into consideration efficiency factors
associated with a long-term integrated services delivery contract delivered
through the private sector. The efficiencies have been applied as reductions to
the Public Sector Comparator (PSC) base costs to determine the PFI base
costs as follows:
• CIP 7% • Lifecycle 7% • O&M 5%
een built in to the PFI Model to take account of a PFI
ontractor’s ability to achieve economies of scale, procurement savings, long-
Whilst the base case assumptions represent
These efficiencies have b
c
term contract security, integrated service delivery through effective coordination
and reduction in duplication, and the ability to bring about innovation.
B - 124
Advisor and IWC:
CIP 11.1%
The commercial risk pricing that a PFI service provider would typically use for
pricing has been determined through a series of risk workshops and is
discussed in more detail under VfM 5.7. The following uplifts were agreed
between the Technical Advisor, the Financial
Lifecycle 6.5%
O&M 2.5%
5.4 PFI Credits and Calculation Methodology PFI credit calculations have been undertaken through both the ‘Revenue
Abatement’ and ‘Gap Funding’ approaches. IWC’s credit requirement is based
on the ‘Gap Funding’ method, however the ‘Revenue Abatement’ method was
nstrate C is s I
support the capital elements of the Project.
5.4.1 Gap Funding Method Based on the cost of works calculated by the Shadow Bid model and IWC
t Method
echnical Advisors. The PFI credit requirement using the
Revenue Abatement method is £399.5m.
used in line with CLG guidan
credits only to
ce and to demo that IW eeking PF
budget contribution to the project, the required funding to meet the project costs
is calculated using the Affordability Model. The PFI credit requirement using the
Gap Funding Method is £400.3m.
5.4.2 Revenue AbatemenThe Revenue Abatement method used is in line with CLG guidance and
calculates the overall project costs, making abatement in respect of the revenue
component. For this project, the split between Capital and Revenue spend
based on detailed costing is assumed as 65:35. The classification of costs into
capital and revenue has been based on discussions with the council’s technical
team and our T
5.4.3 PFI Credit Requirement The council’s credit requirement is based on the ‘Gap Funding’ method as
discussed above. Credits have been calculated for an integrated highways
maintenance service that has the potential for greater efficiency and economies
of scale, details of which are discussed under Shadow Bid Costs 5.3.1. Funding
7 when themarket conditions have changed significantly since 2006/0 original
B - 125
impact of a
worsening base points, and a series of improving
conditions. sitiviti discussed at 5.4.4.
The council has revisited the PFI Project Scope since the Expression of Interest
nergies between the various
e negative impact of
e financial markets.
g factor of 1.0 to be used in the calculation of
FI Credits as specified in CLG’s Local Government PFI Project Support Guide
EOI was submitted and the PFI credit requirements set out in this document
reflect current financial market conditions.
The council has also carried out sensitivities to assess the
credit market by a further 50
These sen es are
stage and this has helped to gain greater sy
highway related services and achieve greater efficiencies. Although the Council
has increased its financial contribution from £5.5m per annum to £11.15m per
annum, the PFI credit requirement has increased from that set out at the EOI
stage. This is due to increased capital requirements, and the increase in
Council contributions has helped to reduce the effects of th
th
The different PFI credit calculation methodologies indicate a PFI Credit
requirement of £400.3m (Gap Funding) and £399.5m (Revenue Abatement).
Both methodologies assume a discount rate of 5.4%, for projects endorsed in
2009-10 and 2010-11, and a scalin
P
(2008-09) p1.
The following table shows the base case Unitary Charge and PFI Credit
requirement:
£’m NPV Revenue Abatement
Gap Funding UC in first full year
OBC Base Case 399.5 400.3 Figures removed for commercial reasons
A
m
r
t the EoI stage, the PFI Credit requirement was £325m (Gap Funding
ethod) or £391m (“Capital Costs” method). At that time PFI Credit
equirement under Revenue Abatement was not calculated.
B - 126
£’m NPV Capital Costs Revenue Gap Funding UC in first full Abatement year
E
removed for commercial
OI Case 391 - 325 Figures
reasons
5
In requirement, a number of sensitivities on financial
terms and scope have been undertaken. The results of these sensitivities are
p
.4.4 Sensitivities
calculating the credit
resented below:
£’m NPV Revenue Abatement Gap Funding UC in first year
OBC Base Case £399.5m £400.3 Figures removed for commercial reasons
Improved terms
ase TBC TBC TBC
C
Im terms-
higher margins
Case
TBC proved TBC TBC
5.5 Affordability The affordability model calculates IWC credit requirement based on the Gap
Funding method, after considering all sources of funds available for the project.
The main sources for funding available for the project are:
B - 127
5.5.1 Budgetary Contribution The current highways budget contribution and additional resources approved by
cil is Project
indexed annually at RPIX). At the EoI stage IWC committed £5.5m p.a. (real
oug the life of the contract but has now been able to more than
double this budget through increasing the scope of the servic
additional funds for client monitoring.
Annual spend
as at 23/7/09 £mHighways 2.300Design 0.430
0.160treet lighting 0.390
0.490Parking 1.700Rights of Way 0.350
.11.40.490
CCTV 0.280Central Services 0.690Additional contribution agreed EOI 0.500
10.450
the Coun £281m over the life of the in nominal terms (£11.15m p.a.,
terms) thr hout
e and committing
Structures SEnergy 0.500Traffic 0.480Network Management 0.160Cowes Ferry
Support 0 30Street Cleansing Public Realm
00
Client side monitorin
g 0.7
5.5.2 Cash flows from PFI Credits PFI credits have been assumed as payable on an annuity basis from the point
encement in accordance with CLG guidance (Local
00
of service comm
Government PFI support guide (2008-2009). The annuity grant receipts are
£743.9m (in nominal terms) over the life of the project.
B - 128
s 5.5.3 Interest on cash balanceInterest on cash balances calculated @ 3.5% arising from the project cash
flows is £50.5m in nominal terms over the life of the project.
5.6 Preferred bidder debt funding competitions Since late 2007 there has been a substantial deterioration in the market for
lending to PFI projects as a result of d
ecreased liquidity in the financial markets.
here is considerable illiquidity among commercial lenders which has resulted
in a reduced availability and increased cost of funds and put a strain on the
enors.
on the Council’s current estim costs, it is expected that the
FI will be looking to raise between £130m and £150m of senior
rrent market, it is unlikel here would be sufficient market
for this amount to be raised effectively through a funding competition,
s of market improvements in the last quarter:
onths there have been signs of a limited improvement
rket, demonstrated throug igh profile M25 deal closing;
There have been some 15 other projects that have closed in the
and
he project is not expected ch financial close until late 2012,
e the market may have substantially recovered.
Council and its Financial Advisors w inually monitor the lending
arket in order to determine the optimum financing strategy at each stage of
e project, and consider possible opportunities for competition in the future.
.7.1 Pre and Post Optimism Bias
eries of risk workshops
have been undertaken to determine the OB levels to be included in the PFI
Financial Model.
T
length of PFI t
Based ated
Highways P
debt. In the cu y that t
interest
however there are sign
• In recent m
in the ma h the h
•
last quarter;
• T to rea
by which tim
he T ill cont
m
th
5.7 Value for Money 5
Optimism Bias (OB) has been calculated in accordance with CLG guidance
note, “Adjusting for Optimism Bias in FRS PFI projects”. The main strategies for
reducing OB, including stakeholder consultation, accurate costing and project
and risk management, have been undertaken and a s
B - 129
le
Expenditure Category OB Pre OB Post
The figures that have been applied for optimism bias are set out in the tab
below;
Initial capex 5% 37.7% Lifecycle 7% 8.0% Opex 5% 12.9% Public sector transaction costs 5% 10.0%
ges added to the PSC costs and set out in the table
bove were agreed at the risk workshops and also include a 5% residual risk
t cover all
of the risks is wrong.
The Council
has used a number of precedents in determining the risk register and had
m
ve
to
quantify them separately.
f risks may be wrong is clearly real;
quantification is essentially a series of informed judgements. However, in the
The OB post percenta
a
allowance. The PSC ‘residual risk’ was considered to be 5% in total and was
allocated to the CIP, Lifecycle and Operation & Maintenance cost categories
pro-rata to their contribution to the overall risk total.
However, the quantification arising from the risk workshops does no
possible risks; it focuses on the quantification of the top 14 risks. There is
therefore a possibility that
• A significant risk has been missed; and/or
• The quantification
The risk of missing something significant out is very small indeed.
significant input from all our advisers, bringing in a wealth of experience fro
similar PFI projects. Risks not within the top 14 are covered by qualitati
analysis which indicates that they have minimal value and it is not necessary
The risk that the quantification o
Council’s view, the risk is just as likely to be on the upside as the downside, and
therefore its expected value is zero.
On the basis of these factors, the Council has taken a judgement to add a
"residual" optimism bias figure of 5% to the numbers arising from the detailed
risk workshops.
B - 130
.7.2 Risk Transfer costs
, to identify all risks relevant to the project including those that will be
t are likely to transfer to the PFI Service P he
identified the key capita cycle and operating risk e:
ificant in impact or likelihood or both; and
ate se service provider.
ms and provide a basis for
sk adjustment to be made to the Public Sector Comparator as part of the
5IWC has conducted a series of robust risk workshops, including our expert
advisors
retained and those tha rovider. T
risk workshop l, life s that ar
a) sign
b) can be transferred to the priv ctor
The commercial value of each of the risk elements was assessed based on
their underlying technical costs, and scenarios for their minimum and maximum
likelihood were defined. The outputs of this process were used as inputs to run
a Monte Carlo simulation to quantify the key risks. Monte Carlo simulations
allow the calculation of risks in net present value ter
ri
Value for Money assessment. The table below presents the NPV of risks as
derived from the Monte Carlo simulations and the risk adjustment as a
percentage of costs.
B - 131
£'m NPV of costs NPV of risk Risk adjustment % of cost
CIP
Figures
reasons
Figures
reasons
Figures removed for commercial reasons
removed for removed for commercial commercial
Lifecycle
Figures removed for commercial reasons
Figures removed for commercial reasons
Figures removed for commercial reasons
O commercial reasons
commercial reasons
commercial reasons
&M
Figures removed for
Figures removed for
Figures removed for
Total
Figures removed for commercial reasons
Figures removed for commercial reasons
Figures removed for commercial reasons
appendix 18 provides the detailed narrative of the risks and the outputs of the
Monte Carlo simulation.
5.7.3 Qualitative Assessment Full detail as to the Qualitative Assessment is in appendix 19.
5.7.4 Quantitative Assessment IWC has followed the HM Treasury guidance in demonstrating Value for Money
(VfM) from the PFI option as compared to the PSC option (also referred to as
the Conventional Procurement ‘CP’ option in the Treasury guidance). IWC
adopted the following process in order to quantitatively assess Value for Money.
B - 132
A series of risk workshops were held to identify and quantify
s. A long list of poten ev onsi en to
whether the risk would be retained, transferred, or shared under the PFI, and
whether there were any actions the council could take to mitigate the risks. The
likely impact of each risk
council may take to mitiga
t ap
A Monte Carlo analysis of the outputs from the risk workshops for the CIP,
Lifecycle and O&M phase rried out to determine the Post Financial
Close Optimism Bias. The
ent.
PSC (Post-OB) PFI (Post-OB) Pre-OB
the key contract
deration givrisk tial risks was d eloped and c
was scored, both before and after any action the
te the risk. The
pendix 19.
resulting risk matrix which was
developed is attached a
s was ca
following table provides a summary of the Risk/OB
assessm
CIP 37.7% 11.1% 5% Lifecycle 8.0%% 6.5% 7% O&M 12.9%% 2.5% 5%
The results of this exercise ere used as inp sury VfM model and
the PFI option was found t % agains option. The details of
this exercise and the detaile
5.8 Initial view on Accounting Treatment Communities and Local Government issued the following “Accounting opinion
(as set out in CLG’s Local
) is that local authorities should produce
te No 1
inly not going to produce information which
w uts to the Trea
o be 12.3
d assumptions she
t the PSC
et are attached at appendix 20.
.
requirements for PFI credits” on 18 November 2008:
for PFI credit support“A current pre-requisite
Government PFI Project Support Guide
an initial accounting view, following the methodology in Technical No
nt for PFI transactions. Central government recognises (Revised) How to accou
that this requirement is almost certa
will still be current when the contract is actually signed, give the change in
accounting arrangements made in April 2009.
B - 133
iven this, the accounting view criterion will be changed for local authorities G
with immediate effect. Local authorities should now include in their Outline
Business Case their best view of the likely accounting position assuming that
available draft IFRS guidance (www.cipfa.org.uk/pt/download/
LAA_SORP_2009_ITC_exposure_draft.pdf) is put in place for 2009/10. At the
same time, authorities should continue to include risk registers showing the
likely risk profile of the contract”.
Paragraph 2 of the above guidance states that the accounting treatment set out
ownership, beneficial entitlement or otherwise - any significant
sidual interest in the property at the end of the term of the arrangement.
re these co sts are met, this Appendix applies to all property
constru nhanced b perator for urpose of the PFI
gement, inc erty to w e local autho ives the operator
access.
l
thority. A related liability shall also be recognised at the same time. The
asset shall be recognised in accordance with FRS 15 .....”. Paragraph 6 further
rty. FRS 15 requires
as relevant.
The Council has discussed this likely accounting treatment with our external
auditors and we will continue to maintain dialogue with them, as well as other
within it shall apply where the local authority controls:
(a) or regulates what services the operator must provide with the property, to
whom it must provide them, and at what price; and
(b) through
re
Whe ntrol te
acquired, cted or e y the o the p
arran luding prop hich th rity g
In addition, paragraph 5 of the above guidance says that “Property used in a
PFI arrangement shall be recognised as an asset or assets of the loca
au
says that “Where the operator enhances property already recognised on the
balance sheet of the local authority, the local authority shall recognise the fair
rying value of the propevalue of the enhancement in the car
the different components of an asset to be accounted for separately if they have
a different useful life, and this approach shall be adopted where appropriate”.
In accordance with the above, our best view of the likely accounting treatment
when the Highways PFI project commences in April 2013 is that it is likely
assets within this project will remain ‘on authority balance sheet’ and
component accounting/fair value accounting will be adopted
B - 134
interested parties, during the procurement process issuing further opinions on
Accounting Treatment as relevant through to Financial Close.
B - 135
.1 Introduction
The Management Case sets out the governance arrangements regarding the
project including differentiating between decision making and operational
activities. It outlines current structures and structures post OBC, and describes
the experience and contribution of the advisors we have appointed to assist us
with this project. It sets out our delivery plan and discusses our approaches
during both the operational and contract monitoring phases. Our approach to
stakeholder management is detailed, together with risk and data management
considerations. We have considered statutory process issues and finally our
readiness to proceed to procurement.
6.2 Project Management and Project Governance Structure (Pre and Post OBC)
The Council’s Highways PFI organisation structure is shown in the diagram
below:
6 Management Case
6
B - 136
ull Council is responsible for adopting various plans and strategies and also
ng financial resources. Reports, e.g. progress reports or
quests for approvals, about this project are made to Full Council as
ly Member Panel)
er Review Board (MRB) for this project consists of the Portfolio
s,
an of the Scrutiny Panel for the Economy, Environment & Transport,
r.
ead of Highways and Transport is an observer member. The MRB meets
on a bi monthly basis to update members on progress and maintain dialogue
between Members and the Project Team.
• Project Board
The Project Board has delegated authority to make relevant decisions affecting
the procurement of the Highways PFI project and, as such, is the main decision
making body for the project. It has approved the scope of the project and
approved the Outline Business Case before submission to the Cabinet.
Although day-to-day responsibility for managing the project has been delegated
to the PFI Programme Director, the Project Board acts as the final arbiter for
issues referred upwards by the Programme Director, either because they fall
outside the remit of the Programme Director, or because he is unable to resolve
a given issue internally.
The Project Board, chaired by the Senior Responsible Owner and including the
Programme Director, the Head of Highways and Transportation, the Section
151 Officer, the Legal Team Leader, and DfT representative, meets at least
• Full Council
F
identifying and allocati
re
appropriate.
• Cabinet
Cabinet consists of the Leader and a number of other councillors, with
portfolios, nominated by the Leader. The Cabinet carries out all of the local
authority's functions which are not the responsibility of any other part of the local
authority, whether by law or under the Constitution. This includes approving
documents such as this OBC.
• Member Review Board (formal
The Memb
Holder for Environment and Transport, the Portfolio Holder for Major Project
the Chairm
the Senior Responsible Owner, and the Highways PFI Programme Directo
The H
B - 137
more frequently by agreement when more immediate
Throughout the project:
sources are allocated including human, physical and
fM and Risk are identified, monitored and
• To report to the Council on the Project’s progress, referring appropriate
oject until it enters procurement:
• To agree the objectives and scope of this project
To agree the procurement plan.
e; Output Specification; Project Agreement; Payment
echanism.
once a month, or
decisions are required.
The specific responsibilities of the Project Board are:
• To ensure sufficient re
financial resources
• To review the Project’s progress against its Project plan.
• To monitor the Project’s budget.
• To ensure a robust quality management process is in place
• To ensure Affordability, V
managed:
issues to Cabinet or Full Council, for approval as required.
• To appoint external advisors as required.
• To champion excellent design, ensuring that it features as a priority in the
selection criteria developed as part of the procurement process.
• To act as ambassadors for this project, and the procurement and delivery of
the facilities thus provided.
From the start of the pr
• To sign off the Outline Business Case before submission to Cabinet
From the start of procurement until contract commencement:
•
• To oversee the progress of the procurement process including the timing of
the OJEU notice; short-listing of bidders; the timing of the ISOS and ISDS;
selection of the Preferred Bidder.
• To agree the contents of key procurement and contractual documents
including the OJEU notic
M
• To ensure that a pre-contract risk review is completed.
• To sign off the Final Business Case.
• To recommend the award of contract.
B - 138
le Officer (SRO)
s the Senior Responsible
fficer and, therefore, the lead officer ultimately responsible for the project
organised with key
stream.
• Senior Responsib
The Director of Environment and Neighbourhoods i
O
6.2.1 Project Team Structure – to OBC
The diagram below illustrates how the current project team
responsibilities shown for each work
untant; FCMA, MICE, MIAustE, BSc Civil
and international levels and considerable highways and PFI
– Chartered Civil Engineer, Member
mber of the Institution of Highways
and Transportation, Prince 2 Practitioner. 37 years Highway experience
The full-time core project team consists of:
• Programme Director, Jay Jayasundara – Chartered Civil Engineer and
Chartered Management Acco
Engineering, MSc Construction Management; Prince2 Practitioner;
significant experience in delivering major complex projects at local,
national
project delivery experience.
• Technical Manager, Malcolm Smith
of the Institute of Civil Engineers, Me
B - 139
including 17 years heading up the Highway Maintenance Section of the
• Commercial Manager, Tracy Ringer – FCCA, BSc Applied Accounting,
Programme Office Manager, Anthony Hiscock – BA Business
er, MSP Practitioner.
This team is dedicated to the project and there are no demands upon it with
regard to other projects. They are supported, as appropriate, by specialists
drawn from other relevant disciplines within the IWC including Property, Planning,
Stakeholder Management, Risk, Legal, Procurement, HR. Whilst these resources
are part-time with regard to the project, their relevant departments are aware of
the strategic importance of this project and have committed to supporting it as
appropriate. Programme Directors from strategic projects meet each other
regularly to discuss progress on their projects, for example since the council is
running a major reorganisation of the Island’s school system at the same time as
the Highways PFI Project, regular meetings are scheduled between the
Programme Director and senior staff associated with the schools project. This
interaction ensures that programmes are compared so that there is no conflict
around specialist skills, material supplies or the necessity for traffic diversions.
Additionally, the Strategic Projects team is responsible for co-ordinating and
monitoring progress on major projects and has synchronized the resourcing
needs on a priority basis to further assist programme planning.
there are a number of specialists, drawn
th
e,
,
t,
e
mitted to the project and understand their role
at
Isle of Wight Council.
BA Humanities with English Language. 7 years Local Authority
accounting experience.
•
Management and Economics, Prince 2 Practition
• PA, Sarah – Louise Foley
• Project Administrator, Maureen Graham
With regard to the technical workstream
from the Environment and Neighbourhoods Directorate, each assisting wi
information around the relevant assets/services including Highways Maintenanc
Highways Renewal Programme, Traffic Management, Structures, Street Lighting
Rural Rights of Way, Parking Services, Contracts and Waste, Environmen
Cowes Ferry and CCTV. Although these staff are part-time with regard to th
Highways PFI project, they are com
within it. There is currently, or foreseen, no other relevant major project th
would conflict on their resource availability.
B - 140
st
l,
two additional technical resources joining the team
y from the Council.
w:
6.2.2 Project Team Structure – Post OBC
The Council is planning to increase the full time resources of the PFI team, po
OBC to support the procurement phase. There will be full time lega
procurement specialists and
during this phase. The legal resource will join the team in September and the
procurement resource and data manager recruitments have commenced. The
Technical Support for the dialogue will be recruited internall
The proposed team structure for the next phase is show belo
6.2.3. Contract Management Team – Post Contract Award
The Council is determined to put in place a strong contract management
structure to establish effective contract management from day one. It has
agreed a provisional structure for the on-going management of the PFI
Contract, post award. It is intended that the post-OBC staff, who are involved in
the CD process, would have built up the vital expertise needed to manage the
contract and will transfer to the on-going Contract Management Team. The
Council will ensure that there is continuity between the procurement and
B - 141
urces with appropriate skills. The
proposed Contract Management Team structure is show below:
contract management phases selecting reso
Contract Manager
PFI Director
Manager:Roads, Footways &
Structures
Manager:Environment, Rural Rights of
Ways
Manager:Car parking, Street Lighting
Manager:Street cleansing, Street Furniture, Public Realm
Manager:Finance
Contractual paymentsCertification
Performance monitoringLegal
Assistant:Roads, Footways &
Structures
Assistant:Environment, Rural Rights of
Ways
Assistant:Car parking, Street Lighting
Assistant:Street cleansing, Street Furniture, Public Realm
Assistant:Finance, Contract & Legal
PA
Director Environment & Neighbourhoods
It is recommended that the proposed Contract Management Team structure
is reviewed after the first two years of operations.
6.3 Expert External Advisors IWC has appointed a number of expert external advisors to assist it with
ensuring a robust project methodology right through to contract commencement
and beyond. These external advisors are described below and letters of
support from them are attached at appendix 20.
• DLA Piper, appointed September 2008, are providing legal advice to the
project, right through to contract commencement and into the early days of the
contract. The key lawyers appointed to this commission include Allison Page,
l have significant
experience of PFI projects and are currently supporting Birmingham City
Descriptive document, the ISOS/ISDS/ISRS/CFT documentation and the
Natasha Luther-Jones, Steven Johns, Lee Dixon. These al
Council and Sheffield City Council on their highways maintenance PFI projects.
DLA Piper will be primarily involved in the production of the project agreement
and relevant schedules and annexures. They have also provided assistance in
respect of the risk register and production of the OBC and going forward they
will be providing assistance with competitive dialogue training, producing
evaluation criteria across work streams, assisting with the production of the
necessary procurement documentation such as the OJEU, the PQQ, the
B - 142
ncial close, in
producing a guide to the project agreement for the council's retained staff who
will be managing the project
• PricewaterhouseCoopers LLP (PWC), appointed October 2008, are
providing financial advice to the project from Outline Business Case through to
contract commencement. The key personnel supporting this project include
Paul Davies, John Carr, Sukhy Duggal, Manisha Misri, Ian Shore, Jonathon
Muga, all of whom have significant experience of PFI projects including
Transport PFI projects. For example, this team includes individuals that have
supported the Portsmouth Highways Maintenance PFI project, the M25
widening project as well as numerous Street Lighting PFI projects across the
country. PwC are also providing support on other highways maintenance PFI
projects including client side support on the Sheffield project and bid side
ith the financial modelling to
establish the cost of the PSC and the PFI project, the level of credits required
tion of the Council. They have also provided
requested of them including
preferred bidder letter. They will continue to attend the monthly project team
meetings. They will also assist, once the project reaches fina
support on the Birmingham project.
PwC’s main tasks so far have included assisting w
and the resultant affordability posi
key assistance in understanding the procurement and contract risks associated
with the project and, where appropriate, quantifying these for the purposes of
the risk analysis to be included in the OBC. Additionally, they offer support on
commercial, financial and procurement issues
providing advice in terms of the latest positions given the current funding
climate.
Going forward, PwC will provide key financial/commercial support at all stages
of the Competitive Dialogue process, from OJEU to financial close, and support
the Council’s project team in procuring the project as well as developing the
capabilities of this team to manage the contract that arises from the project.
The technical advisor (TA) appointment was divided into two phases – pre OBC
that required detailed knowledge of assets, asset condition, economic analysis,
cost modelling and PFI costs and post OBC the longer term technical advisor
appointment went through the OJEU procurement route and evaluation criteria
reflected the expertise needed in the next phase, availability of the key
B - 143
uary 2009, have assisted with options appraisal,
economic modelling, and verification of asset conditions and costs of
PFI projects and are currently working with
M Limited have nearly 40 years experience in undertaking highway
condition surveys and providing asset management consultancy and software
n
ata from the 2008/09 surveys they have predicted the carriageway and
resources and strength of the project management capability. Halcrows were
appointed as the TA to OBC submission with WSP appointed post OBC.
• Halcrow, appointed Jan
rectification and maintenance. They are currently finalising their work for the
OBC and in the process of handing over to WSP Ltd who will continue technical
advice.
• WSP appointed in July 2009, are providing technical advice to the project
from the outset of the procurement process through to the early delivery stages
of the Contract. The key staff appointed to this commission include Steve
O’Donnell (project manager), Gordon Lewis (highways and structures), Robin
Cathcart (PFI contract and paymech), Ian Townhill (street lighting) and they will
be further supported by colleagues within the relevant disciplines. All of these
staff have significant experience of
other clients, including Local Authorities, across a range of sectors. Their main
task is assisting in the development of the Output Specification and Payment
Mechanism. They will also assist in providing technical input to the Project
Agreement and support on technical issues across the project as required.
In addition to these advisors we have also had specialist support for particular
aspects of our project development:
• WD
to highway authorities throughout the UK. They have undertaken annual
SCRIM, Scanner, Deflectograph, Carriageway CVI and Footway DVI surveys
for the Isle of Wight Council for the last 20 years. In addition they maintain and
operate the Council’s Pavement Management System (PMS). Using conditio
d
footway costs for the PFI using the latest modelling techniques developed over
the last 9 years in conjunction with the DfT, Transport for Scotland and highway
authorities. Two of their very experienced Directors and several Pavement
Engineers have been involved in the project.
B - 144
years.
orking closely with the Council's appointed Technical and Economic Advisors
JLT as the Council’s appointed insurance broker have provided specialist
one (also perceived as a training/learning
pportunity) with day two being a working day addressing the issues from day
eir
d
s
these.
also
, as appropriate.
• Colin Buchanan are developing a high level SATURN traffic model of the
Island for the purpose of establishing future traffic flows over the next 25
W
for the Highways PFI project, the model will be used to accurately determine
current and future traffic volumes and assist bidders for the Highways PFI in
their submission. The model will also be used to assess the impact of
developments and changes to the network including for planning control.
•
advice as required in support of the preparation of the OBC.
All of our advisors have significant experience in their field and we meet
regularly with them either on the IW or at their offices and ensure that there is
relevant discussion between them on cross-over topics.
6.4 Meetings 6.4.1 Internal The core project team, and specialist internal staff, meet on a weekly basis to
discuss progress and issues dependent on others in the team.
On a monthly basis we hold a full two day workshop that addresses various
issues relevant to the project on day
o
one. The expert advisors join us for these two days, which also include th
monthly progress update meetings with the Programme Director an
appropriate PFI team member.
6.4.2 External The DfT set up a monthly network meeting with the three pathfinder Highway
authorities, and the Project Director and Technical Manager attend
Additionally they attend the well established Street Lighting Network meeting,
as street lighting is within the scope of this project. We have utilised the DfT
appointed Transactor in developing our project and this OBC, and have
had discussions with other relevant authorities
B - 145
6.5 Project Delivery Plan and Timetable
The project delivery plan has been formulated in Microsoft Project and has been
produced incorporating modified Prince2 methodologies. The project plan is
attached at appendix 22.
Below is a summary of the key milestones.
Activity Scheduled Completion
Submission of OBC 29 October 09 DfT/PRG Approval 23 Feb 10 Issue OJEU 26 Mar 10 Issue ISOS 14 July 10 Issue ISDS 18 Jan 11 Issue CFT 29 Oct 11 Select PB 27 April 12 Financial Close 30 Nov 12 Commence rehabilitation 17 Apr 13
Progress against delivery plans is being measured weekly to ensure that the
programme schedule remains viable. Workshops, containing the IWC internal
will be held every six months to review the
ll Council staff associated with the project have received training on Microsoft
as been used to develop the project plan. The Programme
.6 Operational phase and contract monitoring
team and the external advisors,
programme. These reviews will enable the team to plan in detail the specific
resource requirements and activities that will need to be completed within the
next six months. Further, the workshop gives the project team the chance to
identify any potential issues they may have with the timescales and the ability to
put in place a plan to resolve them.
A
Project which h
Director, Technical Manager and the Programme Office Manager are all Prince2
practitioner qualified and the Programme Office Manager is also a Managing
Successful Programmes practitioner. Both of these methodologies will be used to
manage the programme and form a robust and efficient programme office.
6
B - 146
the successful service provider, the
council will implement a robust mechanism by which the agreement will be
t
ability envelope.
in place to carry out the contract
management activities, including both the direct contract management team and
the wider stakeholders across the organis gion. As detailed
elsewhere, going contra place as
early in ess as possible so that potential bidders can establish
the qua ources we will have available them on the long-
term co aving the intended Isle of Wight contract management team
in plac the dialogue process they will b liar with the project
agreement and key requirements of it and we hope elationships will be
built up ders, particularly with the ultima l bidder.
The Isl aware of particula tinent to the Isle of
. The Council is prepared to vary its contract
been
ompleted.
.7 Project Interface and Dependencies
Once the contract has been awarded to
managed. It is proposed that the principles outlined by the Office of Governmen
Commerce will be adopted, utilising the key areas as a means to ensure delivery
of the best solution within the afford
IWC will ensure that the right people are
ation and re
we intend to have the on ct management team in
to the dialogue proc
lity of the res to work with
ntract. By h
e early on in e fully fami
that good r
with all bid te successfu
e of Wight team is already r issues per
Wight where the PFI provider can be encouraged to address local needs. We are
already working with local learning establishments and residents to highlight
where local skills can be developed to assist with the Project. By utilising local
resources within this service, the Service Provider will have a readily available
solution to ensuring service performance.
For such a complex service provision as is envisaged by the Highways PFI
project it is likely that contract management considerations will require a long
period of development and transition
management quite significantly over the term of the agreement. The overarching
theme must be one which is both robust and flexible enough to handle any
changes; the early stages of transition and mobilisation will require a completely
different set of skills and methods to the long term delivery stage. Performance
management, contract development and supplier relationship management will
become the key elements once the initial stages of the agreement have
c
6
B - 147
r transport operators. Where
ppropriate, the Project Agreement will contain provision to ensure no adverse
lders and
associated communications relating to the project. This document lays out the
s.
nstraints).
Managing stakeholders to keep, or get, them on board for the duration of
The Project has identified a number of interfaces and dependencies that may
affect it, and will attempt to manage these to ensure no detriment to the project in
the long-term. These interfaces and dependencies include fence to fence issues,
utilities, local events, Rights of Way land owners, Network Rail, Havenstreet
Steam Railway, Environment Agency, ferry and othe
a
impact to the project will occur from these.
6.8 Stakeholder Consultations and Communications Strategy
With an anticipated project duration of 25 years, the Isle of Wight Council
Highways PFI Project Team recognises the need to put in place a strategic
framework for the management of stakeholders and communications generally.
This document is the Stakeholder Management Strategic Framework for the Isle
of Wight Highways PFI Project. It defines the strategic framework employed by
the Council’s Highways PFI Team for the management of all stakeho
structures, processes, tools, and human resources typically required to manage
the stakeholder and communication elements of a major project through to
successful completion, with regard to the high level objective of supporting the
successful delivery of the Highways PFI project through the structured and
systematic identification, analysis, and management of Stakeholders, and the
implementation of effective communication
This document does not engage in the specific detail for the execution of the
various stages of the Highways PFI Project. Such plans will be developed and
recorded at a later stage, specifically tailored to meet the needs of the project and
its stakeholder audiences, including
• Identifying and mapping stakeholders in order to understand their influence
on the project and support the decision making process.
• Providing accurate, timely, and relevant information (communications) to
stakeholders using the most appropriate communication channels (within
budgetary co
•
the project.
B - 148
act a large number of people and
rganisations (stakeholders) in a multitude of ways. Therefore, the Highways PFI
h the right
he IWC Highways PFI Project Team will ensure an appropriate framework is in
ication & stakeholder management.
they will be the main beneficiaries of
reement for the service
oviders, delivery drivers and tourists. Additionally interest groups
• Keeping the project team appraised of the general and specific nature of
stakeholder opinion/support/risk (informing ongoing project management
decisions or mitigation planning).
• Providing a communication and engagement audit trail to evidence best
practice and to support a learning/improvement culture within the IWC. The IWC Highways PFI Project will imp
o
Team recognises the need to put in place an appropriate framework wit
structure, tools, processes, and people in order to effectively manage and
communicate with stakeholders from the outset.
T
place that will provide the necessary:
• Structure – Team make up, and how the team is organised.
• Processes – What is done, when, and how.
• Tools – Providing the analytical and data storage backbone of the project
• People (resources) – The human element that reaches and connects with
stakeholders
These four areas make up the core elements of the framework that the Council’s
Highways PFI Project will employ for commun
6.8.1 Local residents The condition of the Isle of Wight roads is one of the major concerns for local
residents. The Residents Surveys have highlighted this as a concern repeatedly.
Hence residents recognise that
improvements, although they will suffer some disruption, particularly during the
Core Investment Period. We aim to keep them informed of the projects’
progress, and provision will be made within the project ag
provider to continue with this precedent.
6.8.2 Network users As well as residents, the Island’s highway network is used by others such as
transport pr
B - 149
project and regular information meetings are
Transport
artnership, while local media are used to keep local residents in the picture as
taff likely to be affected by the PFI have been invited to meetings whereby the
re attending individual team meetings to
cilitate a platform for discussion at every level. Information is being shared with
h
roach can be adopted. Union representatives are also encouraged
raise additional issues as and when they arise.
cludes details of all employees currently in-scope. This system will record all
munications and will ensure that all staff who have been
addition to the above, once the preferred bidder has been selected, the council
ication and meetings between trade union and staff
such as the Ramblers Association and land owners have an interest in the Rights
of Way network. Ensuring wider local stakeholder support has been seen to be a
priority since the inception of the
held with Town and Parish Councillors along with other local interest groups.
Transport operators are kept informed through the council’s Quality
P
to progress. Once the PFI is in the operational phase then the successful
contractor will be required to keep stakeholders updated as to the programme of
works.
6.8.3 All Council staff S
process has been fully outlined and explained. In addition to that, senior
members of the PFI project team a
fa
staff at the earliest opportunity.
The Council has also established regular bi-monthly consultative meetings wit
the local trade union to ensure that continuous consultation occurs to ensure that
an agreed app
to
The Council has created a strategic stakeholder management plan which
in
individual and group com
identified as falling within the scope are kept informed at all stages.
Once we have reached the “Call for final tender” stage, all employees in -scope
for transfer will be provided with the opportunity to meet with Human Resources
advisors and trade union representatives. In addition, meetings with pension staff
will be arranged in the event that the successful bidder does not enter the LGPS.
In
will facilitate commun
representatives and the transferee to enable consultation under TUPE to take
place.
B - 150
advance of the PFI. However, it is anticipated that there may be
ontracts still extant which may give rise to a further TUPE implication. Through
r communication mechanisms, all current
ue to the separation by sea, it will be essential that local contractors and
present
ing from external risks that are outside the control of the
m. Project progress is, and will continue to be, monitored regularly to
6.8.4 Statutory Undertakers
Co-ordinating the highway network refurbishment with the statutory undertakers
will be essential to the success of the project. Initial talks have been held and
there will need to be an on-going dialogue to ensure that their works dovetail with
that of the PFI contractor.
6.8.5 Local suppliers The Council has a co-terminus date for as many of the external contracts as
possible in
c
the Local Industry Day and othe
contractors and the bidders will be advised to seek independent legal advice in
relation to TUPE, and bidders will be provided with contact information to
facilitate direct communication with current contractors on the TUPE implications
ensuring a smooth transition for any non-council TUPE transfers.
D
material suppliers have an opportunity to participate in the project and, whether
TUPE applies or not, the selected bidder will be encouraged to demonstrate a
commitment to utilising local companies and workforce throughout the term of the
contract.
6.9 Sponsorship and Support
6Ever since the idea of using a PFI project to rejuvenate the Isle of Wight’s
highway network was suggested in 2004, there has been cross-party political
litical control has changed during that period but thesupport. Po
controlling Conservative group have had no hesitation in setting aside a £7.6
million budget to see the PFI through to contact commencement. This budget is
considered to be sufficient for the necessary costs including internal staffing,
external advisors, accommodation costs, project networking, training, resources
(ICT) and communications and stakeholder management until April 2013.
The procurement budget of £7.6m contains £0.5m contingency, £0.5m sunk
costs from EoI stage. The contingency has been set aside to deal with delays or
other impacts result
Project Tea
B - 151
s or delays are likely to occur. Should this be the
at local organisations including the Island Strategic
dustry Day for
rospective PFI Bidders.
lose. This will help inform the risk consideration within the council’s
ngoing contract management arrangements for the PFI contract from financial
t appendix 23.
Identify and assess the main risks including an initial allocation and proposal
could impact the project (in the development, procurement and close-out
identify whether any overspend
case then remedial action, as necessary, will be undertaken. Therefore we
expect that, should, for instance, a 6 month delay in commencement of the
project occur, this will be foreseen well in advance and actions to address it
implemented.
We have ensured th
Partnership, the Isle of Wight Economic Partnership, the Quality Transport
Partnership, the Chamber of Commerce, AONB, the Environment Agency, and
other environmental organisations, have been informed about the project’s
intentions and all are supportive of the project.
We have carried out soft market testing as described in the Commercial Case
section to ensure interest in the Project is maintained. We will be holding a local
Industry Day to inform existing contractors and a wider national In
p
6.10 Risk Management A risk management strategy has been developed for the project designed to
manage those risks which could impact the project between the OBC stage and
financial c
o
close. The strategy is attached a
To support the implementation of the risk management strategy, a number of
risk workshops have been held facilitated by the Risk Workstream Lead and
attended by the project team (including the external advisers) in order to:-
• Agree a common approach to risk within the project (in accordance with the
risk management strategy)
•
of a risk action plan for each material risk exposure.
The key outcome of these workshops was the establishment of the risk register
for the PFI Project (see appendix 23). The register records those risks which
B - 152
d, for each material exposure, a target exposure level and risk
ction plan detailing countermeasures in progress or planned to achieve that
ouncil’s corporate objectives. As
consequence of this, the potential failure of the project is a risk captured
following the OBC leading to a direct impact on road
Project risk register. The most
ignificant risks within the Project risk register are reported monthly to the
phases) including both risks which impact the council’s current highways
operations and risks which could impact the anticipated (post-implementation)
business model. For each risk, the register records the nature and potential
impact of the risk exposure identified, its significance in terms of both likelihood
and impact an
a
target level. The register is divided into the key phases of the project –
procurement and award, capital rehabilitation, financial and commercial.
The successful completion of the Highways PFI project represents a major
investment and is key to achievement of the C
a
within the council’s strategic risk register. This, in common with the council’s
other strategic risks, is reported to and monitored by the council’s Directors
Team and Cabinet. This risk is defined in the Council’s strategic risk register
as:-
Failure of the PFI process
infrastructure, economic regeneration and development and on the ability of the
council to maintain a safe highway infrastructure for all users.
This risk summarises, at the highest level, the risk profile of the project
reflecting the more detailed risks within the PFI
s
Project Board. As part of their standing agenda, the Project Board considers
these and any shift in the project risk profile. The current status of risks at this
level is detailed in the table below:-
B - 153
Risk Area Risk Description Impact Proximity
Impa
ct
Prob
abili
ty
Ass
essm
ent
Impa
ct
Prob
abili
ty
Ass
essm
ent
Failure to meet agreed timeline through procurement process to financial close as a result of delays in establishing a dedicated project team supported by external advisors. The consequent delay in commencement of operations will increase internal and advisor costs.
Immediate 4 3 High
(12)
3 1 Low
(3)
Failure to provide dedicated, resourced and experienced personnel to support the project from the internal corporate and technical teams. This will lead to delays and, in extremis, withdrawal of DfT support due to lack of appropriate resource.
Immediate 4 3 High
(12)
2 1 Low
(2)
Risk that approvals required from DfT for financial close are not obtained resulting in project delays, potential project failure and
Medium Term 4 3 High 2 1 Low
reputational impact. (12) (2)
Shortage of materials and/or labour result in higher rehabilitation and maintenance costs
Long Term 4 3 High
(12)
2 2 Low
(4)Increases in Landfill Tax resulting in additional disposal costs. Medium Term 4 3 High
(12)
2 4 Medium
(8)
Costs are higher than expected based on current highway condition surveys and bridge inspections leading to increased lifecycle costs.
Immediate to Long Term 4 3 High
(12)
2 3 Medium
(6)RPI increases greater than projected. Medium to Long Term 4 3 High
(12)
2 2 Low
(4)
Unknown or undisclosed existing environmental contamination resdel
Medium to Long Term 4 3 High 2 3 Mediumulting from inadequate records leads to additional cost and ay. (12) (6)
Availability of funding on reasonable terms during procurement impacting affordability and possible delay
Medium Term 4 4 High
(16)
3 3 Medium
(9)Opportunity for refinancing - risk of refinancing being forced through shorter funding periods in future resulting in sub-optimal outcomes and reduced opportunity for positive impact on affordability.
Medium to Long Term 4 3 High
(12)
3 1 Low
(3)
Risk that required land is not available for depot (plant and material storage) and maintenance yards resulting in delayed commencement.
Immediate to Medium Term
4 3 High
(12)
2 2 Low
(4)Service interfaces with other service providers (waste disposal etc.) not properly identified amnd accommodated leading to
Long Term 4 3 High
delay and service disruption. (12)
2 3
Funding
Other Low
(4)
Project Manageand Resources
Cost and Afford
ment
Target Risk ScoreCurrent Risk Score
ability
have then been combined into a
single overall assessment of each risk at the current level and at a target level
(taking account of the actions planned to mitigate that risk). The assessment
process uses a scale of 1 to 4 (1 being low and 4 being high) for likelihood and
impact and these are combined to give an overall assessment for each risk on a
1 to 16 scale:-
At a more detailed level, using a risk management methodology based on the
council’s risk management practices, each risk has then been assessed on the
basis of both likelihood and potential impact (including, among others, both
financial and reputational impacts). These
B - 154
V
Likely
4
4
Low
8
Medium
12
High
16
High
Likely
3
3
Low
6
Medium
9
Medium
12
High
Unlikel
y
2
2
Very Low
4
Low
6
Medium
8
Medium
Like
lihoo
d/Pr
obab
ility
Remot
e
1
1
Very Low
2
Very
Low
3
Low
4
Low
Scale
Low 1
Medium
2
High 3
Major 4
For each risk, a risk action plan has been drawn up in conjunction with the
workstream leader (i.e. the owner of that risk) and this represents the process to
be followed to reduce the risk exposure to the target level. Progress is tracked
A
th
been allocated to the party deemed best able to manage each
risk at the lowest cost. Clearly those risk allocation decisions will be
reappraised and informed through the procurement phases of the project.
against the risk action plans particularly in respect of the high level risks.
n allocation decision has then been recorded against each risk with one of
e following three markers;
Retained by the council
Shared
To be transferred to the successful bidder.
The risks have
B - 155
These risk identification, assessment and allocation decisions have been
validate rough
The operation of a series of risk workshops and other risk
considerations undertaken by the internal project team, and
v idation revie by the uncil’s external professional
advisors to the proje
expertise and previous experience in the PFI field
A the isk wo s co ed to he ents for each
risk earmarked for potential transfer in order to arrive at an agreed price for that
risk. The initial risk allocation and pricing decisions determined at this stage are
s ct m on or chang hrough the competitive dialogue stage of the
p re nt pro risk ng pr and o e is detailed in
appendix 18.
This process identified key risk exposures potentially impacting:-
• Bidders,
• The PFI contractor
• The council.
or
commercially confidential information, procurement timetables and the costs
reement. Plans are in place to mitigate these
nfidence with the bidders by meeting programmed dates
• Making all data readily available to the bidders via the Project Data
• Development of protocols to ensure IP is protected for all the bidders
• Setting a tight but realistic timetable and keeping to it;
d th :-
o
o A al w co
ct who have significant commercial
fur
ubje
rocu
r r rkshop wa nduct identify t cost elem
to confir
me
ati e t
cess. The prici ocess utcom
A key risk which has been considered relates to the position of the bidders.
Naturally, potential service providers will have concern over a number of
factors including bid costs, protection of intellectual property and/
associated with the early involvement of funders and the due diligence
associated with the PFI ag
through:-
• Building co
for the key stages
Room
• Working openly with the bidders to minimise all costs such as
unproductive or unnecessary meetings
B - 156
• Providing other information to bidders(in an appropriate format), at the
• er,
nal);
o Preparing all necessary collateral on the areas of
ring ways to reduce the costs associated with due diligence.
ement
ses the need for two main areas of data management .
d
re
t
e
s begun formulating a Project Data Room and is in the process of
al
and virtual data will be available to bidders
e
an appointment will have to be
a
heir own unique log-in. The virtual
be
ments. Bidders will
• Supplying information gathered via condition and other surveys at an
early stage;
earliest possible stage;
Undertaking the procurement in an efficient and effective mann
including:
o Ensuring sufficient capacity and capability in the
procurement team (both internal and exter
dialogue in advance of the dialogue sessions so that
bidders have sufficient time for analysis and to develop
their responses;
• Ensuring that the approval process is completed at the appropriate
stage and within appropriate timescales;
• Conside
6.11 Data Manag
The Council recogni
Firstly there is data sharing of key project documents between IWC an
relevant external advisors, with appropriate version control, so that all are awa
of the content of the latest versions of the Project Agreement, Outpu
Specification, Performance Requirements and Payment Mechanism.
Secondly there is the issue of sharing information with potential bidders. Th
project ha
recruiting a Data Manager. This Project Data Room will incorporate physic
and virtual data. Both the physical
on the project, although only one bidder at a time will be allowed to view th
physical material in the Project Data Room and
made prior to viewing any documents. Virtual data will be available through
secure online portal with each bidder having t
data room will have to apply document security in order for the files not to
forwarded on to third parties and to limit printing of the docu
B - 157
new
documents have been produced. A record will be kept to monitor who has seen
y
eviews
Gateway Re il
2003. The principle dependent
individuals, d
in project de re
any actions/a s.
The benefit of using independent individuals is to use people who are able to
d
view.
The Council had the first Gateway review, number 0, carried out in June 2005.
The Gateway 0 highlighted staff resources as being the main area of concern
livery. This has now been fully addressed and is
emonstrated in other sections of this OBC; we have a core team in place,
iate
xperience. Following discussions with the 4P’s, to recommence the Gateway
ttached at
ppendix 25 to the OBC. The Project has been given an amber/green delivery
relevant, about the project.
be notified when new versions of documents have been released or
which document, when they viewed the document and for how long.
6.12 Gateway Reviews / Independent Scrutin
6.12.1 Gateway Rviews were launched in the local government sector by 4ps in Apr
s behind the review process are for a team of in
with experience in project delivery to speak to key players involve
livery and with other stakeholders to consider whether there a
ctivities that could enhance the project’s probability of succes
think about issues without having been party to earlier decisions an
consequently see things from a different point of
for successful project de
d
supported by other specialist staff and external advisors with appropr
e
process it was agreed that Gateway 0 did not require a refresh but that we
would continue with Gateway 1.
This took place on the 21st, 22nd and 23rd July 2009 and the report is a
a
confidence assessment (successful delivery appears probable however
constant attention will be needed to ensure risks do not materialise into major
issues threatening delivery) and we already are aware of the risks identified and
have plans to mitigate them where possible.
6.12.2 Independent Scrutiny To ensure independent scrutiny within IWC, the Chairman of the Scrutiny Panel
for the Economy, Environment & Transport contributes to the Member Review
Board and the chair of IWC’s Overview and Scrutiny Committee was
interviewed by the Gateway Review team and will continue to be informed, as
B - 158
will be
nd Contracting Out
rry out the services, or whether the service provider
n the powers if they are
elegated, the likelihood of any delegated power ceasing to be able to be
ocurement C believe that, upon approval of the OBC, we are ready to proceed to
6.15 Conclusion
6.13 Statutory processes
The Project Team is currently considering whether statutory powers
delegated to the service provider under the Deregulation a
Act 1994 to enable it to ca
will be required to provide the services as an agent of the council under section
1(1) of the Local Government (Contracts) Act 1997.
Discussions have focussed on the precise scope of services required from the
service provider, the services currently able to be delegated under the
Contracting Out (Highways Functions) Order 2009 (including powers able to be
delegated under the New Roads and Street Works Act 1991 and the Traffic
Management Act 2004) together with any restrictions o
d
delegated, and whether any powers that are currently not delegated are likely to
become delegated prior to the of the project agreement.
The final decision regarding the statutory process to be adopted will be made
following consultations between the Project Team and the Project Board.
6.14 Readiness to Proceed to PrIW
procurement. Our delivery plan remains relevant and we have considered what
needs to happen in the forthcoming stages of the project. We have a draft
OJEU notice, work has commenced on the Output Specification, Payment
Mechanism and Project Agreement, and we have considered the resources and
approaches needed to ensure a successful procurement process.