Ghana - Project for the Creation of Sustainable Tsetse and ...

18
Multinational : Project for the Creation of Sustainable Tsetse and Trypanosomiasis Free Areas in East And West Africa - Ghana Component Project Completion Report (PCR)

Transcript of Ghana - Project for the Creation of Sustainable Tsetse and ...

Multinational : Project for the Creation

of Sustainable Tsetse and

Trypanosomiasis Free Areas in East And

West Africa - Ghana Component

Project Completion Report (PCR)

1

A. PROJECT DATA AND KEY DATES I. BASIC INFORMATION

Project Number=ADF 2100150009194

Project Name=MULTINATIONAL PROJECT FOR THE CREATION OF SUSTAINABLE TSETSE AND TRYPANOSOMIASIS FREE AREAS IN EAST AND WEST AFRICA-GHANA COMPONENT

Country (ies)=GHANA

Lending Instrument(s)=Loan No: 2100150009194; Grant No: 2100155003917

Sector = AGRICULTURE

Environmental Classification = Cat. 1

Original Commitment Amount = ADF LOAN=6,640,000.00 UA; ADF Grant=240,000.00 UA

Amount Cancelled = NIL Amount Disbursed = ADF LOAN=6,629,663.39 UA; ADF Grant=240,000.00 UA

Percent Disbursed = ADF LOAN=99.84%;

ADF Grant=100%

Borrower = GOVERNMENT OF GHANA

Executing Agency(ies) [List the main Ministries, Project Implementation Units, Agencies and civil society organizations responsible for implementing project activities.] = MINISTRY OF FOOD AND AGRICULTURE

Co-financers and other External Partners [List all other sources and amounts of financing, technical assistance or other resources used in this project] = Government of Ghana 1.17 UA Million

II. KEY DATES

Project Concept Note Cleared by Ops. Com. =

Appraisal Report Cleared = October, 2004

Board Approval = December, 2004

Restructuring(s) =

Original Date Actual Date

Difference in months [Actual-Original]

EFFECTIVENESS 23rd January, 2006 25th April, 2006 2

MID-TERM REVIEW April, 2008 February, 2009

9

CLOSING 31st December, 2011 31st December, 2011 0

III. RATINGS SUMMARY

All summary ratings are auto-generated by the computer from the relevant section in the PCR.

CRITERIA SUB-CRITERIA RATING

PROJECT OUTCOME

Achievement of Outputs 4

Achievement of Outcomes 3

Timeliness 4

OVERALL PROJECT OUTCOME 4

PROJECT COMPLETION REPORT (PCR)

2

BANK PERFORMANCE

Design and Readiness 4

Supervision 4

OVERALL BANK PERFORMANCE 4

BORROWER PERFORMANCE

Design and Readiness 3

Implementation 4

OVERALL BORROWER PERFORMANCE 4

IV. RESPONSIBLE BANK STAFF

POSITIONS AT APPROVAL AT COMPLETION

Regional Director F. BAKOUP, OIC, ORWA

Sector Director C. SPENCER A. BEILEH : Ag Director, OSAN

Task Manager L. TAWAH L. UMAR, OSAN.1

PCR Team Leader L. UMAR, OSAN.1

PCR Team Members

C. MOLOKWU (Consultant)

B. PROJECT CONTEXT

Summarize the rationale for Bank assistance. State: -what development challenge the project addresses, -the Borrower's overall strategy for addressing it, -Bank activities in this country (ies) and sector over the past year and how they performed, and -ongoing Bank and other externally financed activities that complement, overlap with or relate to this project. Please cite relevant sources. Comment on the strength and coherence of the rationale. [250 words maximum. Any additional narrative about the project's origins and history, if needed, must be placed in Annex 6: Project Narrative]

The Project Appraisal Report noted that T&T is a serious obstacle to poverty reduction and food security, so its removal is ideal. Once the tsetse has been removed and land management systems have been put in place, follow up investments in agriculture production and agro-processing would be sought. The projects aimed at creating sustainable tsetse-free areas in six countries in support of the eradication of tsetse and trypanosomiasis in sub-Saharan Africa. The borrower's overall strategy for addressing it is by integrating suppression, control and eradication approaches while ensuring the reclaimed areas are sustainably, equitably and economically exploited. The project components were: (A)Tsetse Suppression and Eradication Component, comprising four subcomponents of (i) community involvement, (ii) Baseline data collection and

3

processing, (iii) Mass-rearing of tsetse flies, and (iv) Serial release of gamma-radiated sterile males aimed at suppressing approximately 20,000 km2 and eradicating about 20,000 km2 in the North West Region of Ghana. (B) Capacity Building Component, involving three subcomponents, namely, (i) An integrated data information system, (ii) Rehabilitation of sub-regional training facilities, and (iii) Strengthening of national and regional capacities. (C) Sustainable Land Management Component, comprising (i) Land use planning, and (ii) institutional strengthening.(D) Project Coordination and Management Component which involved setting up of a Project Coordination and Management Unit (PCMU) in Ghana; and establishment systems for information exchange and coordination between the national PCMUs, PATTEC “Focal Points” in Ghana and the AU/PATTEC Office in Addis Ababa, Ethiopia.The Onchocercosis and Rinderpest Programmes have succeeded as Pan-African efforts to control onchocercosis and rinderpest from the continent. The success of Africa’s major social and economic development initiatives currently underway, such as NEPAD, could be compromised in the absence of a lasting solution to the T&T problem. The design of the project has drawn on the lessons learned from implementing similar projects in Burkina Faso, Nigeria and Zanzibar as well as the intervention efforts of the affected countries and the donor community to control T&T in Africa over the past decades. Other AfDB financed project with the Ministry of Food and Agriculture in Ghana include: 1. Export Marketing and Quality Awareness Project started January, 2006. Will last 5 years 2. Afram Agricultural Development Project started November, 2006. Will last 5years 3. Cashew Development Project started October, 2006. Will last 5years 4. Northern Rural Growth Programme started June, 2008, Will last 6years. The Portfolio performance of project in Ghana is satisfactory and making significant impact to the development of the country.

C. PROJECT OBJECTIVES AND LOGICAL FRAMEWORK

1. State the Project Development Objective(s) (as set out in the appraisal report)

The objective of the project is to create sustainable tsetse-free areas in six countries in support of the eradication of tsetse and trypanosomiasis in sub-Saharan Africa by integrating suppression, control and eradication approaches while ensuring the reclaimed areas are sustainably, equitably and economically exploited.

2. Describe the major project components and indicate how each will contribute to achieving the Project Development Objective(s).

(A) Tsetse Suppression and Eradication Component, comprising four subcomponents of (i) community involvement, (ii)baseline data collection and processing, (iii) mass-rearing of tsetse flies, and (iv) serial release of gamma-radiated sterile males aimed at suppressing approximately 20,000 km2 and eradicating about 20,000 km2 in the North West Region of Ghana. (B) Capacity Building Component, involving three subcomponents, namely, (i) an integrated data information system, (ii) rehabilitation of sub-regional training facilities, and (iii) strengthening of national and regional capacities. (C) Sustainable Land Management Component, comprising (i) land use planning, and (ii) institutional strengthening.(D) Project Coordination and Management Component will involve setting up of a Project Coordination and Management Unit (PCMU) in Ghana; and establishment systems for information exchange and coordination between the national PCMUs, PATTEC “Focal Points” in Ghana and the AU/PATTEC Office in Addis Ababa, Ethiopia.

3. Provide a brief assessment (up to two sentences) of the project objectives along the following 3 dimensions. Insert a working score, using the scoring scale provided in Appendix 1.

PROJECT OBJECTIVES DIMENSIONS ASSESSMENT WORKING SCORE

RELEVANT a) Relevant to the country's development priorities

The project development objectives are consistent with the Ghana Food and Agriculture Sector Development Policy(FASDEP II) and the Medium Term Agriculture Sector Investment Plan (METASIP)

4

4

ACHIEVABLE b) Objectives could in principle be achieved with the project inputs and in the expected timeframe

The objectives could in principle be achieved with the project inputs and in the expected time frame

3

CONSISTENT

c) Consistent with the Bank's country or regional strategy

It is a regional initiative in the agriculture sector that is consistent with the Bank’s regional integration policy. 4

d) Consistent with the Bank's corporate priorities

The goal of the project which is poverty reduction is consistent with the Bank’s Vision Statement.

4

4. Summarize the log. frame. If a log. frame does not exist, complete the table below, indicating the overall project development objective, the major components of the project, the major activities of each component and their expected outputs, outcomes, and indicators for measuring the achievement of outcomes. Add aditional rows for components, activities, outputs or outcomes if needed.

COMPONENTS ACTIVITIES OUTPUTS EXPECTED OUTCOMES INDICATORS TO BE MEASURED

Component 1 = Tsetse Suppression and Eradication Component

Activity 1 = Community engagement.

Output 1 = Communities mobilized and involved in the suppression and eradication of tsetse flies

Outcome 1= Communities no longer at risk of sleeping sickness by PY6.

1.1 Prevalence of sleeping sickness in humans by py6

Activity 2 = Baseline data collection TORs prepared and commissioned: Household, Environmental, Land cover, Entomology and Parasitology surveys.

Output 2 = Baseline data on Environmental, Entomological and Parasitological situation in the project collected

Outcome 2 = 122168 heads of cattle no longer at risk of trypanosomiasis by PY6.

1.2 Prevalence of trypanosomiasis in cattle by py6

Activity 3 = Monitoring of agreed entomological, parasitological and environmental indicators

Output 3 = Tsetse and Trypanosomiasis; and the Environment Monitored and Managed

Activity 4 = Rehabilitation of insectary buildings; Procurement and installation of Gamma radiation source, tsetse production units and other equipment; and Production of sterile male flies.

Output 4 = Insectaries rehabilitated, equipped and staffed; and mass rearing of tsetse fly colonies started.

Outcome 3 = 20,000 km2 cleared of tsetse flies by PY6.

1.3 Prevalence of tsetse flies in the cleared area by py6

5

Activity 5 = Procurement and deployment of traps, targets, pour-ons and SAT for suppression of tsetse; Sequential procurement and release of sterile male flies; Deployment of barriers where required around eradicated and suppressed areas

Output 5 = Suppression activities with traps and targets started; and ground and aerial spraying were conducted at selected locations; and sterile males released weekly over a period of 18 months.

Activity 6 = Early diagnosis and treatment of infected people; and Treatment of cattle

Output 6 = Diagnosis and Treatment of cases of trypanosomiasis; and Human Sleeping Sickness carried out.

Outcome 4 = Crop yield increased by 21% in the project area by PY6;

3.3 Percentage increase in crop yield in py6

Component 2 = Capacity Building Component

Activity 1 =Development and installation of database management system and GIS hardware and software; Acquisition, checking and incorporation of data

Output 7 = Integrated Data Information framework establishment

Activity 2= Rehabilitate, equip and Strengthen training centre; Conduct Training, workshops, “learning by doing” for tsetse and environmental staff.

Output 8 = National capacities Strengthened

Component 3 = Sustainable Land Management Component

Activity 1 = Commission land use planning exercise; writing of SLM Guidelines and supporting leaflets as training and reference material for technical and

Outcome 5 = Meat off take increased by 26% in the area covered by PY6;

3.2 Percentage increase in Meat off take in py6

Output 9 = Land use planning strategies developed

6

5. For each dimension of the log. frame, provide a brief assessment (up to two sentences) of the extent to which the log. frame achieved the following. Insert a working score, using the scoring scale provided in Appendix 1. If no log. frame exists, score this section as a 1 (one).

LOG. FRAME DIMENSIONS ASSESSMENT WORKING SCORE

LOGICAL

a) Presents a logical causal chain for achieving the project development objectives

The logical consistency, cause and effect relationship were quite evident. The statements were unambiguous (except for gender) .

4

MEASURABLE

b) Expresses objectives and outcomes in a way that is measurable and quantifiable

Objectives and outcomes are measurable and quantifiable but some may not be achieved within the projects scope and resources

3

THOROUGH c) States the risks and key assumptions

The assumptions/risks are comprehensive and monitorable

4

extension staff and local leaders.

Activity 2= Short training of local technical and extension staff; community selected village-level technicians/leaders (“paraprofessionals”); and Promotion of village and farm level land use planning and land husbandry.

Component 4 = Project Coordination and Management Component

Activity 1= Establish PCMU office with appropriate information technology and communication facilities.

Output 10 = Project Management structure established and operational

Outcome 6 = Milk off-take increased by 26% in the area covered by PY6

3.3 Percentage increase in Milk off take in py6

Activity 2:= Establish regular communication between all levels; periodic reporting and meeting schedules.

Output 11 = Monitoring and Evaluation Framework Established and Operational

7

D. OUTPUTS AND OUTCOMES I. ACHIEVEMENT OF OUTPUTS

In the table below, assess the achievement of actual vs. expected outputs for each major activity. Import the expected outputs from the log. frame in Section C. Score the extent to which the expected outputs were achieved. Weight the scores by the activities' approximate share of project costs. Weighted scores are auto-calculated by the computer. The overall output score will be auto-calculated as the sum of the weighted scores. Override the auto-calculated score, if desired, and provide justification.

MAJOR ACTIVITIES Working Score

Share of Project Costs in percentage

(as stated in Appraisal Report)

Weighted Score (auto-calculated) Expected Outputs Actual Outputs

Output 1 = 600 Communities mobilized and involved in the suppression and eradication of tsetse flies

Output 1 = 621 Communities mobilized, trained and cooperated in the suppression and eradication of tsetse flies

4 8 0,32

Output 2 = Baseline data on Environmental, Entomological and Parasitological situation in the project collected

Output 2 = Baseline data on Environmental, Entomological and Parasitological situation in the project collected

3 8 0,24

Output 3 = Tsetse and Trypanosomiasis; and the Environment Monitored and Managed (Continuous)

Output 3 = Tsetse and Trypanosomiasis; and the Environment Monitored and Managed. (Continuous)

4 8 0,32

Output 4 = 1 Insectary Laboratory rehabilitated, equipped and staffed; and mass rearing of tsetse fly colonies started

Output 4 =1No. Insectary Laboratory rehabilitated, equipped and staffed; and mass rearing of tsetse fly colonies started

4 16 0,64

Output 5 = Suppression activities with traps and targets started; and ground and aerial spraying were conducted at selected locations; and sterile males released weekly over a period of 18 months.

Output 5 = Continuous Suppression activities with 30,000 traps and targets started; and ground and aerial spraying were conducted at selected locations; and sterile males released weekly over a period of 18 months.

4 32 1,28

Output 6 = Diagnosis and Treatment of cases of trypanosomiasis; and Human Sleeping Sickness carried out.

Output 6 = Up to 13,000 people in communities along the catchment area were screened. Drugs were available on request from WHO. No case detected. Zero burden of Human African Trypanosomiasis (HAT) in Ghana was established with certainty.No record of any person that was adversely affected due to the spraying activities.

4 8 0,32

8

Output 7= Integrated Data Information framework establishment

Output 7= Integrated Data Information framework establishment

4 3 0,12

Output 8 = National capacities Strengthened

Output 8 =National capacities Strengthened: 41 Technical staff comprising of 34 males and 7 females; 71 Extension staff; About 508 contact farmers; About 49 Community animal health workers and 37 extension volunteers; were trained in skills needed for tsetse suppression.

3 3 0,09

Output 9 = Land use planning strategies developed

Output 9 = Land use planning strategies developed: Produced land use plans and land cover maps; 11 pastures have been established as demonstration plots in selected communities in the project area. More 20,000 km2 of land now available for cultivation leading to higher production and food security.

3 2 0,06

Output 10 = Project Management structure established and operational

Output 10 = Project Management structure established and operational; PCMU office with appropriate information technology and communication facilities were established and are functional.

4 8 0,32

Output 11 = Monitoring and Evaluation Framework Established and Operational

Output 11 = Monitoring and Evaluation Framework Established and Operational; Periodic reporting and meeting schedules established.

4 3 0,12

OVERAL OUTPUT SCORE [Score is calculated as the sum of weighted scores]

4

Check here to override the auto-calculated score

Provide justification for over-riding the auto-calculated score

Insert the new score or re-enter the autocalculated score 4

9

II. ACHIEVEMENT OF OUTCOMES

1. Using available monitoring data, assess the achievement of expected outcomes. Import the expected outcomes from the log. frame in Section C. Score the extent to which the expected outcomes were achieved. The overall outcome score will be auto-calculated as an average of the working scores. Override the auto-calculated score, if desired, and provide justification.

OUTCOMES Working Score Expected Actual

Outcome 1= Communities no longer at risk of sleeping sickness by PY6

Outcome 1= Communities in the project area are no longer at risk of sleeping sickness

4

Outcome 2 = 122168 heads of cattle no longer at risk of trypanosomiasis by PY6

Outcome 2 = 122168 heads of cattle no longer at risk of trypanosomiasis

4

Outcome 3 = 20,000 km2 cleared of tsetse flies by PY6

Outcome 3 = 20,000 km2 cleared of tsetse flies 4

Outcome 4 = Crop yield increased by 21% in the project area by PY6

Outcome 4 = Crop yield increased: 6% for maize; 21% for millet and 24% for sorghum in the project area

3

Outcome 5 = Meat off take increased by 26% in the area covered by PY6

Outcome 5 = Livestock population increased as follows: Cattle=7%; sheep=17% and goats=24% in the area

3

Outcome 6 = Milk off-take increased by 26% in the area covered by PY6

Outcome 6 = No information on milk production 1

OVERALL OUTCOME SCORE [Score is calculated as an average of the working scores]

3

Check here to override the auto-calculated score

Provide justification for over-riding the auto-calculated score

Insert the new score or re-enter the autocalculated score 3

2. Additional outcomes. Comment on the project's additional outcomes not captured in the log. frame, including cross-cutting issues (e.g., gender).

Zero Burden in Ghana for Human African Trypanasomiasis (HAT) was established with certainty. Employment was created for rural youths who were trained in the use of knapsack sprayers.

3. Risks to sustained achievement of outcomes. State the factors that affect, or could affect, the long-run or sustained achievement of project outcomes. Indicate if any new activity or institutional change is recommended to help sustain outcomes. The analysis should draw upon the sensitivity analysis in Annex 3, where appropriate.

Re-invasion of flies due i) lack of continuity in the mobilization of communities in the project area to continue putting the targets; pour-on and carrying out ground spraying periodically; ii) Failure to secure funding to continue with the implementation of the programme in other parts of the country and iii) for supporting the sterile insect technology.

E. PROJECT DESIGN AND READINESS FOR IMPLEMENTATION

1. State the extent to which the Bank and the Borrower ensured the project was commensurate with the Borrower’s capacity to implement by designing the project appropriately and by putting in place the necessary implementation arrangements. Consider all major design aspects, such as extent to which project design took into account lessons learned from previous PCRs in the sector or the country (please cite key PCRs); whether the project was informed by robust analytical work (please cite key documents); how well Bank and Borrower assessed the capacity of the implementing agencies and/or Project Implementation Unit; scope of consultations and partnerships; economic rationale of project; and provisions made for technical assistance. [200 words maximum. Any additional narrative about implementation should be included at Annex 6: Project Narrative]

10

In line with Paris Declaration, staff to implement the project were drawn from the ministry, trained and provided with necessary IT equipment and information system to ensure sustainability. The government provided its contribution by annual budget allocations. The design of the project drew on the lessons learned from implementing similar projects in Burkina Faso, Nigeria and Zanzibar as well as the intervention efforts of the affected countries and the donor community to control T&T in Africa over the past decades. The project drew from experiences and lessons of community involvement in the RTTCP, FITCA and several individual country tsetse control programmes.The communities were trained to carry out ground spraying; deployment of targets; administration of “pour-ons”; treatment of livestock and report any invasion to the paravet trained for the purpose. The insectary laboratory at Ghana Atomic Energy Commission was rehabilitated and equipped for the production and dissemination of sterile tsetse males to check reinvasion of the flies and ensure the sustainability of the success attained by the project.National capacities of both men and women for co-ordinated eradication of tsetse flies and trypanosomiasis will be strengthened through focused training of key staff, workshops and above all by “learning by doing”: A number of institutions with the required capability were used and contacted during the implementation to ensure available, current technologies to ensure success (ILRI, KETRI, ICIPE, Universities, CIRDES, ELAT). Representatives of the donor community contacted (American State department, European Union, World Bank, DFID, FAO, IAEA, KFW, German development agency) during project implementation which supported the achievement of project objectives.

2. For each dimension of project design and readiness for implementation, provide a brief assessment (up to two sentences). Insert a working score, using the scoring scale provided in Appendix 1.

PROJECT DESIGN AND READINESS FOR IMPLEMENTATION DIMENSIONS

ASSESSMENT WORKING

SCORE

REALISM a) Project complexity is matched with country capacity and political commitment.

The project complexity was matched with Ghana capacity of diligent and seasoned PCMU staff as well as the political commitment of the GoG expressed in FASDEP II and METASIP

4

RISK ASSESSMENT AND MITIGATION

b) Project design includes adequate risk analysis.

From the Appraisal Report the project in Ghana was rated category 1. Accordingly a comprehensive Environmental and Social Impact Assessment (ESIA) was carried out. The ESIA Summary was distributed to Board members on 28 July 2004. Consultants (8 person/month) were recruited to prepare indicators and protocol and to monitor regularly the activities of the project. Community empowerment in Tsetse suppression will ensure continuity and prevent reinfestation. Government is now, annually, budgeting for suppression and have a well trained unit and staff.

4

USE OF COUNTRY SYSTEMS

c) Project procurement, financial management, monitoring and/or other systems are based on those already in use by government and/or other partners.

The PCMU namely: the Project Coordinator (PC), Entomologist, Geographic Information Systems (GIS) Expert, Monitoring & Evaluation Specialist and Project Accountant were seasoned and experienced civil servants seconded to the project from the relevant ministries. This contributed to the high performance and no turnover of PCMU staff during implementation

4

For the following dimensions, provide separate working scores for Bank performance and Borrower performance: WORKING

SCORE

Bank

CLARITY d) Responsibilities for project implementation were clearly defined.

The responsibilities were clearly defined and understandable in the appraisal document.

4

11

PROCUREMENT READINESS

e) Necessary implementation documents (e.g. specifications, design, procurement documents) were ready at appraisal.

There were Appraisal documents. Standard bidding documents/Bank contracts were ready. The project's work plan with budgelines was available.

3

MONITORING READINESS

f) Monitoring indicators and monitoring plan were agreed upon before project launch.

The Overall project Result Based Logical frame work was available at appraisal and was agreed upon before project launch. This was domesticated to the Ghana Project Area. There was Ghana implementation and monitoring plan.

3

BASELINE DATA h) Baseline data were available or are were collected during project design.

Gender disaggregated baseline data were collected In PY2; Environmental, Parasitological and Enttomological Baseline data were available in PY2

4

F. IMPLEMENTATION

1. State the major characteristics of project implementation with reference to: adherence to schedules, quality of construction or other work, performance of consultants, effectiveness of Bank supervision, and effectiveness of Borrower oversight. Assess how well the Bank and the Borrower ensured compliance with safeguards. [200 words maximum. [Any additional narrative about implementation should be included at Annex 6: Project Narrative.]

All activities scheduled in the appraisal document were carried out. Resource mobilization was on schedule: all the project key personnel were timely appointed; and orientation workshops and staff capacity building were adequately implemented. Contractors and consultants delivered effectively and timely. The Bank (AfDB) undertook 7 supervisory missions, whilst PATTEC embarked on 3 review mission. Other missions included, 4 internal audit mission, 1 portfolio enhancement mission, 1 mid-term review mission and 1 monitoring mission during the 6 years. The recommendations of the aide-memoires were adequately implemented. The frequent missions and skill mix ensured proper guidance for effective project implementation. Most of the critical project outputs were delivered in satisfactory conditions. All planned equipments were purchased and confirmed adequate and arrived on time. The expenditures were adequately justified. Relevant supporting documents (invoices, expenditure request memos, receipts etc.) were properly recorded and filed. Adequate prudence, transparency and accountability were exercised in all purchases made and the annual audited accounts of the project were duly transmitted on schedule to relevant stakeholders. Project implementation followed the best practice approach within the reach of the implementing agency. Project outputs were delivered at competitive prices. The PMCU proposed and modified some aspects of the project strategies: the purchase and introduction of sterile male flies Sterile Insect Technonolgy (SIT) approach was not practicable consequently, with due approval from the Bank, the PMCU adopted the practicable, time saving and more cost effective Sequential Aerosol Technique (SAT) strategy. Implementation records included mandatory quarterly, annual and mission reports as well as copious data collection and record keeping to track key project indicators (KPI) during the implementation. There were annual work and monitoring plans; and periodic progress reports. The Bank and borrower to a large extent ensured compliance with the safeguards especially environmental and human health during the project implementation. Consultants (8 person/month) were recruited to prepare indicators and protocol and to monitor regularly the activities of the project.

2. Comment on the role of other partners (e.g. donors, NGOs, contractors, etc.). Assess the effectiveness of co-financing arrangements and of donor coordination, if applicable.

The only co-finacer is the GoG. No other NGOs or donors contributed funds. However, Ghana Health Service, Disease Control Division supported by WHO provided technical support to the health team to carry out the Sleeping Sickness Surveys. The Environmental Protection Agency (EPA) of Ghana provided guidelines on pesticide use. FAO, Animal Health Division, Rome, provided 10 man-days technical support to develop the database design.

12

3. Harmonization. State whether the Bank made explicit efforts to harmonize instruments, systems and/or approaches with other partners.

No other partner was involved in the project. Ghana Health Service, Disease Control Division; Environmental Protection Agency (EPA) of Ghana; and the FAO, Animal Health Division, Rome, provided complimentary support/assistance to the project. They were neither partnering nor implementing a similar project.

4. For each dimension of project implementation, assess the extent to which the project achieved the following. Provide a brief assessment (up to two sentences) and insert a working score, using the scoring scale provided in Appendix 1.

PROJECT IMPLEMENTATION DIMENSIONS ASSESSMENT WORKING

SCORE

TIMELINESS

a) Extent of project adherence to the original closing date. If the number on the right is: below 12, score 4 between 12.1 to 24, score 3 between 24.1 to 36, score 2 beyond 36.1, score 1

Difference in months between original closing date and actual closing date or date of 98% disb. rate.

4

0

BANK PERFORMANCE

b) Bank complied with:

Environmental Safeguards Consultants prepared indicators, monitored and adhered to

4

Fiduciary Requirements Funds were timely disbursed and modifications were carried out when due

4

Project Covenants Complied timely with the covenants 4

c) Bank provided quality supervision in the form of skills mix and practicality of solutions

AfDB undertook 7 supervisory missions, PATTEC took 3 review mission. Other missions included, 4 internal audit mission =4; portfolio enhancement mission=1; mid-term review mission=1 and monitoring mission=1, during the 6 years.

3

d) Bank provided quality management oversight

Bank provided quality result oriented management oversight

4

BORROWER PERFORMANCE

e) Borrower complied with:

Environmental Safeguards Following the appraisal report, Consultants prepared indicators, monitored and adhered to environmental safeguards

4

Fiduciary Requirements

In addition to the loan/grant funds, the government contribution was timely and adequate. It is now an annual practice to provide funds for tsetse suppression and eradication. Funds were judiciously used. Cost efficient and effective implementation was carried out. Audit and all reports were regular and satisfactory.

4

Project Covenants

The borrower complied with the covenants and where there was need for modification, duly sought and obtained no objection and support from the Bank

4

13

f) Borrower was responsive to Bank supervision findings and recommendations

Bank recommendations were implemented timely

3

g) Borrower collected and used monitoring information for decision making

Monitoring information were collected and were effective for project steering

4

G. COMPLETION

1. IS THE PCR DELIVERED ON A TIMELY BASIS, IN COMPLIANCE WITH BANK POLICY?

Date project reached 98% disb. Rate (or closing date if applicable)

Date PCR was sent to [email protected] Difference in months

WORKING SCORE (auto-calculated) if the difference is 6 months or less, a 4 is scored. If the difference is 6.1 or more, a 1 is scored

0 4

2. Briefly describe the PCR Process. Describe the Borrower’s and co-financers' involvement in producing the document. Highlight any major differences of opinion concerning the assessments made in this PCR. Describe the team composition and confirm whether a site visit was undertaken. Mention any major collaboration from other development partners. State the extent of field office involvement in producing the report. Indicate whether comments from Peer Reviewers were received on time (provide names and positions of Peer Reviwers). [100 words maximum]

The borrower prepared an Internal PCR and submitted it to the Bank. An African Development Bank Group PCR team, led by a Development Economist (Team Leader) visited Accra, Tamale and Wa in the Upper West Region of Ghana from 21st November to 5th December, 2011. The Mission visited the project headquarters at Pong Tamale and held several meetings with Dr.Charles Mahama, (Project Coordinator) and his team. The mission visited the Ministry of Food and Agriculture, Accra, Ghana and had discussions with the Director of Veterinary Services Directorate Dr. Mark-Hansen; the Ghana Field Office of the African Development Bank; the insectary at Ghana Atomic Energy Commission and met Dr. A Yawson and his technical team; the Disease Control and Prevention Department of the Ministry of health, Ghana and had discussion with the Director Dr. KyeiFaried; met with other development partners including: Mrs. Azara Ali Mamshie, the National Coordinator of West Africa Agricultural Productivity Programme (WAAPP)-Ghana; The mission visited Jamboso community in the Wa West District and held meeting with Chief, Dare Soyare, and members of the village community of which in attendance was 23 men, 4 women and 2 children. The mission visited the 2.5Ha fodder bank of “cajanus cajan” which was one of the outputs of the Sustainable land Management component. The community reported that the eradication has made it possible for them to sit under the shade of trees and carry out off-farm activities; that it had positive effect on the health of livestock and humans; that they have not observed any adverse side effect; that with the assistance of the local Paravets, they are fully mobilized to combat the tsetse flies. The project is contributory unit to the Food and Agriculture Sector Development Policy (FASDEPII) which feeds into the Ghana Medium Term Agriculture Sector Investment Plan (METASIP 2011-2015). The production and dissemination of sterile tsetse males from the insectary at Ghana Atomic Energy Commission laboratory will ensure the sustainability of the success attained by the project. The Disease Control and Prevention Department of the Ministry of health, informed the mission that it fully participated in the Tsetse Control and Eradication Project. At the end of CATT screening exercise Zero burden of Human African Trypanosomiasis (HAT) in Ghana was established with certainty. There was no record of any person that was adversely affected due to the spraying activities. The Human Health Department received excellent support from the tsetse project; He emphatically indicated that the project was a clear demonstration that good working relationship could exist between Human and Animal Health in Ghana which was achieved through advocacy and collaborative arrangements of the tsetse project coordinator.

14

H. LESSONS LEARNED

Summarize key lessons for the Bank and the Borrower suggested by the project’s outcomes [250 words maximum. Any additional narrative about lessons learned, if needed, must be placed in Annex 6: Project Narrative]

1) There was only one logical framework (design) for the 7 countries involved in the project. In a multi-national project; it would have been proper to articulate the Logframe for individual countries thereafter consolidate them into the whole project Logframe. 2) There was no inbuilt counterpart contribution in kind for the communities in the project areas to buy into the project subsequently sustain the project benefits even after the funding life of the project. 3) Members of the communities should have been organized into Economic Interest Groups that would be locally registered as cooperating unit; conduct regular meetings; share ideas and information on the project; and make some regular contributions to enable them operate group fodder bank farms; buy insecticides; “pour on”; targets or seek paravet assistance (if the need arose); systematically contribute labour when necessary (counterpart funding in kind) to ensure project sustainability even after the funding period. 4) Appropriate and capable leadership for the project: the project was a clear demonstration that good working relationship could exist between Human and Animal Health in Ghana which was achieved through advocacy and collaborative arrangements of the project coordinator. 5) Timely recognition that reliance on the application of SIT in Ghana would not lead to the achievement of the project objectives, consequently, the timely switch over to integrated strategy including the adoption of SAT which was more cost effective, timely and efficient in delivering the project objectives. 6) The flexible and result oriented management of the Bank: the Bank demonstrated its emphasis on results in timely approval of moving funds from the purchase of sterile insects to aerial spray. 7) At the End of CATT screening exercise, Zero burden in Ghana was established with certainty and there was no record of any person that was adversely affected due to the spraying activities.

I. PROJECT RATINGS SUMMARY All working scores and ratings are auto-generated by the computer from the relevant section in the PCR.

CRITERIA SUB-CRITERIA WORKING

SCORE

PROJECT OUTCOME

Achievement of outputs 4

Achievement of outcomes 3

Timeliness 4

OVERALL PROJECT OUTCOME SCORE 4

BANK PERFORMANCE

Design and Readiness

Project Objectives were relevant to country development priorities. 4

Project Objectives could in principle be achieved with the project inputs and in the expected time frame.

3

Project Objectives were consistent with the Bank’s country or regional strategy 4

Project Objectives were consistent with the Bank’s corporate priorities 4

The log frame presents a logical causal chain for achieving the project development objectives. 4

The log frame expresses objectives and outcomes in a way that is measurable and quantifiable. 3

The log frame states the risks and key assumptions. 4

15

Project complexity was matched with country capacity and political commitment. 4

Project design includes adequate risk analysis. 4

Project procurement, financial management, monitoring and/or other systems were based on those already in use by government and/or other partners. 4

Responsibilities for project implementation were clearly defined. 4

Necessary implementation documents (e.g. specifications, design, procurement documents) were ready at appraisal. 3

Monitoring indicators and monitoring plan were agreed upon during design. 3

Baseline data were available or were collected during design. 4

PROJECT DESIGN AND READINESS SUB-SCORE 4

Supervision:

Bank complied with:

Environmental Safeguards 4

Fiduciary Requirements 4

Project Covenants 4

Bank provided quality supervision in the form of skills mix provided and practicality of solutions.

3

Bank provided quality management oversight. 4

PCR was delivered on a timely basis 4

SUPERVISION SUB-SCORE 4

OVERALL BANK PERFORMANCE SCORE 4

BORROWER PERFORMANCE

Design and Readiness

Responsibilities for project implementation are clearly defined. 4

Necessary implementation documents (e.g. specifications, design, procurement documents) are ready at appraisal.

3

Monitoring indicators and monitoring plan are agreed upon and baseline data are available or are being collected

4

PROJECT DESIGN AND READINESS SCORE 4

Implementation

Borrower complied with:

Environmental Safeguards 4

Fiduciary Requirements 4

Project Covenants 4

Borrower was responsive to Bank supervision findings and recommendations. 3

Borrower collected and used of monitoring information for decision-making. 4

IMPLEMENTATION SUB-SCORE 4

OVERALL BORROWER PERFORMANCE SCORE 4

J. PROCESSING

STEP SIGNATURE AND COMMENTS DATE

Sector Manager Clearance

Regional Director Clearance

Sector Director Approval

16

APPENDIX 1 Scale for Working Scores and Ratings

SCORE EXPLANATION

4 Very Good- Fully achieved with no shortcomings

3 Good- Mostly achieved despite a few shortcomings

2 Fair- Partially achieved. Shortcomings and achievements are roughly balanced

1 Poor- Very limited achievement with extensive shortcomings

NA Non Applicable

Note: The formulas round up or down for decimal points. Only whole numbers are computed.

17

LIST OF ANNEXES

Mandatory 1. Project Costs and Financing a. Project costs by component b. Financing by sources of funds

2. Bank Inputs. List the key team members, and their specialties, during preparation and supervision. Provide a consolidated list of Preparation, Supervision and Completion Missions in chronological order. Provide the date and ratings of the last supervision report.

3. Economic Analysis (ERR) and Financial Analysis, if appropriate Re-estimate the economic rates of return based on costs and benefits at completion, and compare with appraisal estimates. Break down by components as appropriate. Analyze the sensitivity of the ERR to key assumptions. Present a financial analysis for project beneficiary entities.

4. Procurement Plan. Please attached the most recent Procurement Plan

5. List of Supporting Documents

Optional

6. Project Narrative. Key factors not covered in the main template that affected the design and implementation of the project. Such factors, both positive and negative, could include: climate and weather, political changes, contractual or personnel matters, technical issues, procurement processes, and interactions with other partners. If any of these factors is significant enough to affect the evaluation ratings, it should be noted in the template with a reference to this annex.