Gammon at 60: Looking back, looking ahead

45
金門印記 ISSUE 1 2018 P10 CIC recognises Gammon's commitment to nurturing talents with four Gold awards. 建造業議會頒贈四項金獎,嘉許金門積極培育人才 P12 Gammon celebrates 60 years of constructive partnership with Hong Kong with a firing of the iconic Noonday Gun. 午炮響徹維港 慶賀金門與香港同行60載 Gammon at 60: Looking back, looking ahead 回首豐盛 60 昂然邁進新世代

Transcript of Gammon at 60: Looking back, looking ahead

金門印記 ISSUE 1 2018

P10CIC recognises Gammon's commitment to nurturing talents with four Gold awards.建造業議會頒贈四項金獎,嘉許金門積極培育人才

P12Gammon celebrates 60 years of constructive partnership with Hong Kong with a firing of the iconic Noonday Gun.午炮響徹維港 慶賀金門與香港同行60載

Gammon at 60:Looking back, looking ahead

回首豐盛60載 昂然邁進新世代

Chief Executive’s Mes sage總裁的話

12

Issue 1/2018

CONTENTS 目錄

4 News 快訊

15 Health, Safety and Environment健康、安全及環保

This year marks an important anniversary for Gammon – 60 years of

collective innovation and efforts that have seen us grow with the city of

Hong Kong and become a leading construction company.

The past 60 years have seen Hong Kong and Gammon develop

together as one, and we are proud to have played a leading role in so

many landmark projects that play an important part in making Hong Kong

the international city it is today.

Key to that growth and our success has been our embrace of

innovative solutions as well as safety and sustainability to achieve the most

cost-efficient and effective outcomes.

Innovative technology will play a crucial role in shaping Gammon’s

business outlook . We endeavour to realise the concept of Integrated

Digital Project Delivery (IDPD). Cutting-edge technology such as robotics,

Building Information Modelling (BIM), 3D printing, virtual reality and

Design for Manufacture and Assembly (DfMA) can all serve to increase

productivity, ease heavy work and make workplaces safer under IDPD’s

umbrella.

Fatalities still occur in construction sites and accidents continue to

occur. Our goal will always continue to be Zero Harm, but we still have not

achieved it. For this reason, we need to develop new safety methodologies

such as promoting offsite work using modular construction that can be

moved to sites after completion in line with Gammon’s 2025 goal and

vision of a 25 per cent reduction of onsite activity.

Meanwhile, Gammon’s Sustainability Roadmap 2020, launched in

2012, promotes industry-wide environmental sustainability in keeping

with our commitment to “Use wisely, waste less and emit less” and to our

“Zero Waste Plan”. Our next step is to look to the future and formulate our

sustainability strategy for 2025 and beyond.

Here’s to another exciting 60 years!

金門慶祝成立60週年,標誌著我們與香港一起成長,憑藉創新和不斷努力,成

為業內首屈一指的建築公司。

在這60年間,金門和香港的發展互相緊扣。我們非常榮幸,能參與興建多

項具地標意義的建築項目,見證香港成為現代化的國際大

都會。

金門的成功,關鍵在於致力創新、注重安全和可

持續發展,取得最佳的工程效率和成本效益。創新

技術對金門未來的業務發展非常重要,我們會朝著

「綜合數碼建造方案」這嶄新概念建造項目,在這大

前提下採用先進技術如機械臂、建築信息模擬、三

維立體打印、虛擬實境和「簡化製造及裝配過程的設

計」等,配合施工,從而提升生產力、令重型工

作更加輕鬆、締造更安全的工作環境。

金門一直以「零傷害」為施工目

標,但工地裡仍不時發生傷亡事故和

意外,為此,我們積極推行嶄新的安

全措施,例如推廣模組建築法,在

工場建造建築組件,然後運送到

工地,以配合金門在2025年減少

地盤工作量25% 的目標。

我們早在2012年已訂定

「2020年可持續發展路線圖」,承諾

「善用、減耗、減排」原則,並推行

「惜物減廢計劃」,以推動整個建造業界

支持可持續發展的環保措施。然而,我

們未敢鬆懈,下一步就是放眼未來,制

定2025年及以後的可持續發展策略。

願金門同仁繼續攜手努力,一同

迎接未來更精彩光輝的歲月!

Thomas Ho 何安誠

The past 60 years have seen Hong Kong and Gammon develop together as one, and we are proud to have played a leading role in so many landmark projects that play an important part in making Hong Kong the international city it is today.”

金門的成功,關鍵在於致力創新、注重安全和可

持續發展,取得最佳的工程效率和成本效益。創新

技術對金門未來的業務發展非常重要,我們會朝著

「綜合數碼建造方案」這嶄新概念建造項目,在這大

前提下採用先進技術如機械臂、建築信息模擬、三

維立體打印、虛擬實境和「簡化製造及裝配過程的設

計」等,配合施工,從而提升生產力、令重型工

作更加輕鬆、締造更安全的工作環境。

金門一直以「零傷害」為施工目

標,但工地裡仍不時發生傷亡事故和

意外,為此,我們積極推行嶄新的安

全措施,例如推廣模組建築法,在

「2020年可持續發展路線圖」,承諾

「善用、減耗、減排」原則,並推行

「惜物減廢計劃」,以推動整個建造業界

支持可持續發展的環保措施。然而,我

們未敢鬆懈,下一步就是放眼未來,制

定2025年及以後的可持續發展策略。

願金門同仁繼續攜手努力,一同

何安誠

2 | The Record • Issue 1/2018

10

Executive Editor Edmond LaiEditor, English Chris TaylorEditor, Chinese Chloe TamDesign Manager Johnny Chan

執行總編 黎永覺 英文主編 Chris Taylor中文主編 譚婉儀 設計總監 陳錦源

From the Editor’s Desk 編輯的話

20 Focus Story and Milestones焦點特寫及發展里程碑

It started 60 years ago with a group of engineers who came to Hong Kong to work on the Kai Tak Runway Extension. Today, Gammon is proud to have developed into a leading construction company with 7,000 employees and an annual turnover of US$2.5 billion.

60年前,一群充滿熱誠的工程師初次踏足香港,為啟德機場跑

道進行擴建工程,繼而在香港扎根。今日的金門已打穩根基,

成為一家首屈一指、擁有7,000員工、每年營業額達25億美元

的建築公司。回顧這段發展旅程,金門引以為榮。

30 Awards 獎項

34 Corporate Social Responsibility企業社會責任

40 Major Current Contracts List工程合約一覽表

Your contributions are welcome. Please contactCandy Chan, Corporate Com mu ni ca tions Manager歡迎各位提供寶貴意見,請隨時聯絡企業傳訊經理陳敏碧

Tel +852 2516 8733 Fax +852 2516 6260E-mail [email protected]

www.gammonconstruction.com

When the 3Hs Click…“Talent development does not happen by chance. It requires synchronisation of the “Head” (detailed planning), the “Heart” (personal commitment) and the “Hands” (focus with actions). No single element alone will click.”

We proudly witnessed Gammon’s commitment to talent development when our team received four Gold Awards on stage for our training footprint in various arenas from the Construction Industry Council (CIC). We salute our trainers and colleagues for their relentless pursuit of this long-distance run!

In the face of the ever-changing business environment, upskilling has become the top priority for organisations striving to sustain their competitive edge. Gammon deeply values apprenticeship and continuous career and professional development for our people. Recently, we signed a Memorandum of Understanding with the Vocational Training Council to forge a collaboration in STEM (Science, Technology, Engineering and Mathematics) education of future talent.

Hong Kong is lacking 5,000 to 10,000 skilled workers to sustain its infrastructure and community development. Gammon has been working hand in hand with the CIC through the years to tackle this challenge. The result is 710 new bloods in 17 different trades trained up within a window of five years.

It is now very clear that Integrated Digital Project Delivery (IDPD) and Design for Manufacture and Assembly (DfMA) will provide ultimate solutions to address challenges of productivity, project performance and labour-intense work. That said, we still need highly skilled people to execute these solutions.

Happy reading!

同想、同心、同步…

「培育人才絕非易事,需要精明的頭腦訂定周詳計劃,用心承諾,以行動把計劃

付諸實行,思想、心、手同步,缺一不可。」

金門非常榮幸獲建造業議會頒贈四項金獎,嘉許我們在不同範疇積極培育

人才。同時,我們衷心感謝各位導師和同事,在人才培訓這長跑路上,努力不

懈,循循善誘地教導學員!

面對瞬息萬變的市場環境,企業必須不斷提升技術水平以維持競爭優勢。

金門非常重視學徒訓練,以及員工的事業和專業發

展。我們最近與職業訓練局簽訂了合作備忘錄,在

科學、科技、工程和數學四個範疇,攜手努力作

育英才。

香港現需要額外五千至一萬個技術工人,以

應付未來基建及社會設施的發展。面對挑戰,金

門多年來與建造業議會緊密合作,在這五年間,已

於17個工種中培訓了710位建造業生力軍。

在這數碼世代,「綜合數碼建造方案」和「簡

化製造及裝配過程的設計」能提供有效的建

造方案,以提升生產力及工程項目表現、

同時解決勞工密集工序帶來的挑戰。然

而,我們仍需要技術成熟的工人實踐工

程方案。

培育人才絕非易

事,需要思想、心、手同

步,互相配合,缺一不可。

請細閱今期的《金門印記》!

Edmond Lai 黎永覺Executive Director 執行董事

35

This publication is proudly managed and produced by製作及統籌機構Bamboo Business CommunicationsTel +852 2838 4553Fax +852 2873 3329

The Record • Issue 1/2018 | 3

News 快訊

The Gammon Cocktail Reception on 19 October 2017 at Exchange Square welcomed 500 guests to a glamorous evening, celebrating another fruitful year for Gammon of excelling in various technology-related activities, thanks to the unwavering support of its business partners and industry players.

The signature event was attended by Michael Wong, Secretary for Development, Dr WK Lo, Legislative Council Member. Chief Executive Thomas Ho took to the stage in power-assisted gear to highlight Gammon’s focus on technological change for a better future.

“The theme tonight – ‘A Reality by 2030’ – envisions the direction that we will be taking as we ride technology into a new era of construction,” said Thomas.

On this special occasion, the Gammon Way Awards was also in the limelight, recognising staff who best demonstrate

Gammon’s core values. The Grand Award winners went to the Lyric Theatre foundation team and the team innovating the software robot with AZ Gambot.

一年一度的金門酒會在2017年10月19日假交易廣場

隆重舉行,金門感謝出席的500多位業務夥伴和業界

翹楚鼎力支持,讓我們在業務中取得驕人成績,成就

豐盛的一年。

我們非常榮幸邀得發展局局長黃偉綸及立法會

議員盧偉國博士出席盛會。總裁何安誠在酒會中穿

上機械裝甲衣,親身展示金門決意以科技建造更美好

的將來。

他說:「酒會的主題『實踐2030願景』,充分展現

了金門的未來發展路向,我們決心以科技帶領建造業

開創新領域。」

我們又藉此盛會頒發「金門之道大獎」,表揚在工

作中展現金門核心價值的員工。西九文化區演藝劇場

地基工程團隊及研發金門人工智能軟件Gambot的團

隊光芒四射,一同奪得大獎。1

The Gammon Way Awards 2017 金門之道大獎

Teams 團隊 Awards 獎項

The foundation works for Lyric Theatre Complex西九文化區演藝劇場地基工程團隊

Grand Award & Category Winner (Excellence)金門之道大獎及共創卓越獎

Gambot Grand Award & Category Winner (Integrity)金門之道大獎及共鑄誠信獎

Pristine Metal Works 東莞原創金屬結構

Category Winner (Safety)共建安全獎

Togetherness and success, a night to remember舉杯同賀 共創新景象

The Cocktail was graced by Michael Wong, Secretary for Development.金門邀得發展局局長黃偉綸出席盛會。

4 | The Record • Issue 1/2018

快訊 News

This year’s Gammon Spring Dinner was even more joyous than usual because it celebrated Gammon’s 60th anniversary with the theme “Go Gammon”, which highlights our energy and growth.

Energetic taekwondo dancing and K-pop performances energised the atmosphere of the evening, which was a fitting tribute to Gammon’s can-do spirit. Best of the Year was

highlighted to recognise staff and business partners who dedicate to excellence services.

今年的春茗晚宴比以往更加精彩,晚宴以「勇往直

前」為主題,慶祝金門成立60週年,突顯公司的活力

和朝氣。

活力澎湃的K-POP跆拳道表演率先掀動全場氣

氛,展現金門的奮進精神。晚宴亦頒發「全年傑出成

就獎」,嘉許表現優秀的同事及合作夥伴。1

勇往直前

Best Business Partners AwardWai Hung Construction Engineering Co Ltd

最佳合作夥伴獎 偉雄建築工程有限公司

Construction Advisor Wong Ping Poung (Second Left) and General Foreman Chan Ho Kee (Third

Right) awarded with 45-year long-service awards.工程顧問黃秉鵬(左二)及高級總管陳浩基(右三)

獲得45年長期服務獎。

Best Worker Award Lee Kam Bo最佳工友獎 李金寶

Best Frontline Staff Award Law Choi Ying, Candy最佳前線員工獎 羅彩英

Best Site Agent Award Wong Chi Ming最佳地盤總管獎 黃志明

Best Quantity Surveyor AwardChan Wun Cheung, Karen

最佳工料測量師獎 陳煥章

Best Project Manager Award Cheng Ping Pui最佳項目經理獎 鄭炳培

Best Safety Sub-Contractor AwardRichwell Civil Engineering Ltd

最佳安全分判商獎 顯豐土木工程有限公司

The Record • Issue 1/2018 | 5

News 快訊News 快訊

Gammon is delighted to contribute to the development of the city’s infrastructure and facilities, with the winning of two public works contracts totalling HK$7.7 billion. They include a HK$6.2 billion contract by the Highways Department for the Kai Tak West Section of the Central Kowloon Route, and a HK$1.5 billion contract by the West Kowloon Cultural District Authority (WKCDA) to deliver the extended basement and public infrastructure works for the L1 Contract for Lyric Theatre Complex and Extended Basement at WKCD.

The Kai Tak West Section contract forms a vital part of the overall Central Kowloon Route, a 4.7km-long dual three-lane strategic trunk road in Central Kowloon that will relieve congestion in Central Kowloon’s road network. In delivering the project Gammon will be maximising the use of modularisation for elements of the works, while its patented piling technology will be used to construct the temporary wall for excavation works. Work is expected to be completed by 2025.

For the Lyric Theatre contract which forms part of the West Kowloon Cultural

District development, it is the third contract that Gammon has won with WKCDA, Gammon will employ innovations that improve safety and productivity in delivery of the works, including modular components, digital building information model, scanning and 3D printing. Work is expected to be completed by mid-2020.

金門非常榮幸贏得兩項總值77億港元的公共工程

合約,為香港的基建設施作出貢獻。兩個項目分

別為路政署批出價值62億港元的中九龍幹線 ─

啟德西工程合約,及西九文化區管理局批出價值

15億港元的西九龍文化區演藝綜合劇場地庫擴建

及公共設施工程。

啟德西工程路段是中九龍幹線的策略性重要

組成部分,該幹線全長4.7公里,雙程三線行車,

完成後將有助紓緩中九龍道路網的擠塞情況。金

門團隊會以最佳的方案完成工程,包括高度運用

模組技術,進行挖掘工程時用專利打樁技術為挖

掘工程建造臨時牆,預計工程於2025年完成。

演藝綜合劇場屬西九龍文化區發展項目的重要

部分,亦是金門第三度贏得西九文化區管理局的合

約。金門會以創新科技,包括採用預制組件、數碼

建築信息模擬、三維掃描和打印技術等,提高工程

的安全和生產力,預計在2020年中完成項目。1

Infrastructure contracts totalling HK$7.7 billion secured奪77億基建合約

“We are delighted to be working with the Highways Department and the WKCDA

again and to be able to utilise our considerable in-house capabilities to deliver

the works to the highest standards.我們非常高興能再度與路政署及西九文化區管理局合作。

金門會融合各部門的優勢,以最高質量完成工程。”Thomas Ho, Chief Executive of Gammon

金門總裁何安誠

The project team celebrates the commencement of the Lyric Theatre

Complex project at the Baisun Ceremony.西九龍文化區演藝綜合劇場地庫擴建工程的項目

團隊進行拜神儀式,慶祝工程啟動。

6 | The Record • Issue 1/2018

快訊 News

Gammon’s annual celebration of creative thinking, the Innovation Competition, was successfully held on 23 November 2017 at The Excelsior, Causeway Bay, and 100 entries were received.

Five entries were shortlisted for judging Grand Award, presenting the judging panel with the challenge of weighing the various merits of this year’s excellent ideas. The winner was the innovative Clutch Pipe Pile, which like the runners up and category winners were all recommended for bringing safety, productivity and quality to the next level.

As a gesture of thanks to the judges and in support of the local construction society, Gammon donated HK$15,000 to The Lighthouse Club Hong Kong Benevolent Fund.

金門每年舉辦「創意大賽」嘉許創新思維,2017年的比賽

共收到超過100個創新意念,並於 11月23日假香港怡東酒

店舉行。

評判團以能夠提升安全、生產力及工程質素至更高層

次為評審準則,選出最後五個入圍項目、各組別的優勝者,

及「創意大獎」得主 – 連續式互扣式管樁。

此外,金門感謝評判團支持香港建造業持續發展,特

捐贈15,000港元予香港明建會慈善基金,以表謝意。1

Ideas 得獎項目 Awards 獎項

Clutch Pipe Pile 連續式互扣式管樁 Grand Award 大獎

GamBot First Runner up 亞軍

ROBOCOM Second Runner up 季軍

Indoor Air Quality Disinfection Robot 室內空氣消毒機械人 Finalist 入圍獎

Floatation Frame 漂浮架 Finalist 入圍獎

What is a Clutch Pipe Pile?什麼是連續式互扣式管樁?

The Clutch Pipe Pile comprises two major parts – the pipe pile casing, which acts as a main body to provide a structural frame for the lateral support system, and a tailor-made clutch welded on two sides of the pipe pile casing to provide an effective water cutoff. This innovation has been granted the Hong Kong Short Term Patent and China Patent of Clutch Pipe Pile construction.

連續式互扣式管樁由兩部分組成。首先是管樁的外

殻,它為側向支撐系統提供主要支架結構;另一部

分是度身訂造、焊接至外殻兩側的離合器,它能有

效阻截地下水滲入樁管。連續式互扣式管樁已成功

申請香港短期專利及中國專利。

2017 Innovation Competition創意大賽

The Record • Issue 1/2018 | 7

News 快訊News 快訊

Global Switch Singapore hosts BCA visit歡迎新加坡建設局到訪

On 5 April 2018, the Global Switch Woodlands Singapore (GSSW) project team hosted a delegation from the Singapore Building and Construction Authority (BCA) led by BCA Deputy CEO Neo Choon Keong.

The delegation also included

representatives from Ministry of Health Holdings, Changi Airport Group and JTC, whose field trip was conducted to inspect the GSSW use of MEP modular and integrated DfMA solutions – a first of its kind in terms of large-scale implementation in Singapore.

The delegation expressed their appreciation to the client and the Gammon team for hosting the visit, describing it as “a real eye opener”, adding that they felt certain that GSSW would “boost industry confidence in adopting prefabricated MEP systems for higher productivity and quality.

新加坡建設局副行政總裁 Neo Choon Keong在2018

年4月5日率領考察團到訪 Global Switch Woodlands

Singapore(GSSW)數據中心項目。

考察團成員包括新加坡衛生控股有限公司、

樟宜機場集團及裕廊集團的代表。他們主要參觀

GSSW項目使用的模組化機電設備,及首次在新加

坡大規模進行的綜合簡化製造及裝配過程設計建築

方案。

考察團成員均表示此行「大開眼界」,他們感謝

金門團隊及客戶的安排,並認同預鑄模組化機電設備

能提升生產力和建造質素,GSSW 項目增強業界對

模組化機電設備的信心。1

5 awards taken home at the Lighthouse Club 獲香港明建會頒發5個獎項

On 16 March 2018, Gammon and Lambeth Associates Ltd (‘Lambeth’), a subsidiary of Gammon, have collectively won five awards at the Lighthouse Club Health & Safety Awards, and earned acclaimed recognition from the industry.

2018年3月18日,金門及集團旗下的琳寶工程顧問有限公司(琳

寶)獲明建會頒贈共五項健康及安全建築殊榮,表揚金門團隊

對安全建築的貢獻。1

International Design for Safety Awards, Bronze 國際安全設計獎 – 銅獎

Leighton-Gammon Joint Venture Express Rail Link – West Kowloon Terminus Station North禮頓 - 金門聯營 高鐵西九龍總站(北)

International Design for Safety Awards, Highly Commended 國際安全設計獎 – 優異獎

Lambeth Tuen Mun – Chek Lap Kok Link – Southern Connection Viaduct Section琳寶 屯門至赤�角連接路 – 南面連接路高架道路段項目

Lambeth & Mott MacDonald Hong Kong Joint Venture Midfield Concourse Works琳寶及Mott MacDonald聯營 機場中場客運廊工程

Highly Commended Approach to Safety Leadership 高級安全領袖獎

Tony Small, Director of Gammon 金門董事薛東尼

Commended Approach to Safety Leadership Award 安全領袖獎

Lambeth 琳寶

8 | The Record • Issue 1/2018

Digital transformation is the way of the future for the construction industry, and the binding force among different stakeholders is the key to get the benefits from it. The Digital Construction Conference was organised to fulfil this purpose.

The Conference, on 28 November 2017, had the theme “Present to Future”. It highlighted exciting new ideas in the area of digital construction and featured a diverse blend of 13 speakers, consisting of overseas and local industry veterans as well as young talents, to exchange thoughts and views. The topics covered sensors, robotics, Building Information Modelling (BIM), cloud computing, Design for Manufacture and Assembly (DfMA) and AI.

Albert Wong, CEO of Hong Kong Science and Technology Parks Corporate and keynote speaker, encouraged the industry to seize vigorously opportunities to take the industry to a new era that would contribute to the technology innovation ecosystem of Hong Kong.

數碼轉型是建造業的未來發展路向,與業界

持分者緊密攜手,更是推動建造業長足發展

的關鍵,為此金門特意在2017年11月28日舉

行「數碼建築會議」,藉以與業界交流意見,

互為裨益。

會議以《邁向新世代》為題,探討數碼建

築中的嶄新意念。金門邀得13位不同範疇的

講者,包括香港及海外的業界專才和年青才

俊,就廣泛的議題分享心得,範圍涵蓋感應

器、機械設備、建築信息模擬、雲端運算、

簡化製造及裝配過程的設計、人工智能等。

香港科技園行政總裁黃克強更應邀為大

會作專題演說。他勉勵業界要積極抓緊機

遇,推動建造業邁進新里程,為香港的創新

科技作出貢獻。1

Embracing a digital future邁向數碼新世代

快訊 News

Albert Wong Hak Keung, Chief ExecutiveOfficer, Hong Kong Science andTechnology Parks Corporation香港科技園公司行政總裁黃克強

Prof Fabio Gramazio, Director of Studies,Department of Architecture,

ETH Zurich, Switzerland 瑞士蘇黎世聯邦理工學院建築學系

教學總監Fabio Gramazio教授

Tran Vo Phuong Duy, BIM Manager,COFICO, Vietnam

越南COFICO建築信息模擬經理

Tran Vo Phuong Duy

Prof Eric Tsui, Professor, Department ofIndustrial and System Engineering,

The Hong Kong Polytechnic University香港理工大學工業及系統工程學系

徐汝康教授

Terence Lui, Head of DigitalTransformation, Innovation, Gammon

金門創新部數碼轉型總監呂樂倫

Heba Bevan, CEO and Founder,UtterBerry, UK

英國UtterBerry創辦人及行政總裁

Heba Bevan

The Record • Issue 1/2018 | 9

Talent development recognised積極培育人才獲讚許Our endeavours in training and nurturing young practitioners for the industry was recognised at the Employers Luncheon and Appreciation Ceremony organised by the Construction Industry Council (CIC) on 20 April 2018 at the Zero Carbon Building. Executive Director Edmond Lai collected four Gold Awards on Gammon’s behalf. Two of our colleagues received the “Most Outstanding Trainers in Cooperative Training Scheme”Award.

Edmond exchanged views on talent development in the discussion session. “We are purpose driven to provide training opportunities for people to unleash their talents, so as a whole, we can bring the industry’s professionalism to new heights,” he said.

Conroy Tsang, now construction supervisor, was invited to share his experience of being a Gammon intern, and expressed his gratitude to his supervisors, who are so supportive and caring for youngsters. He said “I feel like I’m more privileged than my peers in being given opportunities to learn to use advanced technologies and gain construction expertise.”

The ceremony was held in recognition of employers who, in 2017, participated actively in CIC training and development programmes, helping to promote an outstanding training culture in the industry.

金門積極培育人才獲業界的肯定。建造業議會在2018年4月20日假零碳天地舉

行「僱主午餐會暨嘉許典禮」,執行董事黎永覺在典禮上代表金門接受四項金

獎,另兩位地盤總管獲贈「合作培訓計劃最優秀導師獎」 。

黎永覺在研討環節分享他對學徒培訓的經驗和心得時說:「金門重視人才,

積極為年青人提供學習機會,讓他們發展所長,同時協助提升整體建造業的專

業水平。」

曾文強由學徒升至工程主管,獲邀分享他作為金門實習學員時的體驗。他

表示衷心感受到導師的循循善誘、對所有學員的關懷和支持,並說:「我感到我

比其他同學更加幸運,有機會在金門學習先進科技和專業的建築技術。」

建造業議會特別舉辦這典禮,嘉許過去一年積極支持培訓工作的僱主,同

時向業界推廣優良的培訓文化。1

News 快訊News 快訊

Contractor Hiring the Most Number of Graduate Apprentices聘用最多畢業學員之承建商

Contractor Hiring the Most Number of Trades 聘用最多工種之承建商

Employer Signing the Most Number of Apprentice Contracts簽署學徒合約最多之僱主

Contractor Actively Participating in CooperativeTraining Schemes (Construction Craftsmen Training)

積極參與合作培訓計劃之承建商(培訓大工)

Most Outstanding Trainers in Cooperative Training SchemesSo Kam Yuen, Superintendent

Chung Hing Choy, Senior Construction Superintendent合作培訓計劃最優秀導師

總管蘇錦源及高級建造總管鍾慶財

AWARDSGOLD

10 | The Record • Issue 1/2018

Run for 60 • Run for Charity60誌慶慈善跑2018 marks the 60th birthday of Gammon, Gammon kicked off the celebrations with a good cause – “Run for 60 • Run for Charity” on 28 January. The Event was organised to raise funds for Construction Charity Fund, which provides support to families of the unfortunate members of our industry.

More than 100 Gammon staff, family members and business partners joined the event with loving and caring hearts, running the Gammon Construction China Coast Full/Half Marathon or 10km races to raise over HK$1.6 million!

On the same day in the Community Chest Run, Horace Chu (bottom left), Director of Gammon, won the Championship as the fastest Chief Executive.

Thanks to the contribution of our subcontractor partners and supplier partners as well as the support of our runners!

為慶祝金門成立60週年,在1月28日舉行的「金門建

築中國沿岸馬拉松及半馬拉松」及10公里慈善競跑活

動正好為60週年誌慶揭開序幕,同時為建造業關懷

基金籌款,支援業內因意外身故的工友家屬。

超過100位業務夥伴、員工和親友獻出關懷和愛

心,為慈善競跑籌得善款超過160萬港元。

金門董事朱凱威(左下)更在同日舉行的「公益慈

善馬拉松」中,奪得行政總裁組別的冠軍殊榮。

謹感謝我們的業務夥伴,包括分判商和供應商作

出的貢獻,更感謝金門健兒的支持和努力!1

快訊 News

The Record • Issue 1/2018 | 11

News 快訊News 快訊

On 18 May 2018, Hong Kong’s iconic noonday gun boomed over the harbour, celebrating Gammon’s 60th anniversary in Hong Kong. The memorable moment was presided over by Paul Chan, GBM, GBS, MH, JP, the Financial Secretary of the Hong Kong Special Administrative Region and Thomas Ho, Chief Executive of Gammon.

“Firing the noon day gun into the Victoria Harbour is my kind of opening ceremony… The Chinese Jia zi 甲子, the 60-year cycle, symbolises a full life span. That it also symbolises a new beginning, for Gammon, for Hong Kong, and in fact for all of us.” said Paul Chan.

Thomas offered thanks to all of Gammon’s business partners and friends, to the vision and generosity of Gammon’s founder John Gammon, to the support of shareholders Jardines and Balfour Beatty

and to the loyalty and hard work of all Gammon staff.

Thomas also presented a cheque for HK$1.6 million to Chow Luen Kiu, the Chairman of Hong Kong Construction Industry Employees General Union. The money was raised by the Construction Charity Fund with the support of 46 supplier and subcontractor partners that participated in the Gammon-organised “Run for 60, Run for Charity” event, which was held earlier in the year.

The business environment will be no less demanding than that of our first 60 years. Situations change, challenges remain!

Let’s get together and innovate to new heights!

2018年5月18日,位於銅鑼灣的午炮響徹維港。鳴

放午炮儀式由香港特別行政區財政司司長陳茂波及

Noonday gun booms in celebration of Gammon 60th anniversary同心同行60載 午炮響徹維港

總裁何安誠主持,慶祝金門成立60週年。

陳茂波對維港鳴放午炮這揭幕儀式表示非常欣

賞,他說:「中國傳統以60年一個甲子為一個完整週

期,這60週年誌慶象徵金門、香港以至我們的一個

新開始。」

何安誠感謝所有業務夥伴和摯友、創辦人John

Gammon遠大的目光、股東怡和集團及保富集團的

支持,以及全體員工的忠誠和努力。

何安誠並在典禮上致送160萬港元的支票予香

港建造業總工會理事長周聯僑。金門早前舉行「60

誌慶慈善跑」活動,得46家供應商及分判商支持,

為建造業關懷基金籌得善款。

展望未來,市場環境會比以往60年更具挑戰

性,時代不斷轉變,新挑戰亦不斷湧現!

讓我們一起攜手,為金門的業績再創新高!1

12 | The Record • Issue 1/2018

We are proud to highlight the innovative thinking of our hardworking and dedicated staff who were nominated for Innovator of the Month from January 2018 to April 2018. 金門的員工勤奮用心,我們謹此恭賀2018年1月至4月的「創意之星」。

Raymond Lee Chi-wai, Assistant Engineer

Idea: 3D modelling with an aerial camera

Description: Compiling the topographic graphs required by surveyors of construction sites is time-consuming and some areas may even be inaccessible, leading to inaccurate drawings. With the adoption of an aerial camera, we can reinvent the practices. After taking the aerial photos, we use photo-processing software to generate a 3D model of the real situation in excellent detail.

Benefits: Save surveyors having to spend time patrolling sites, thus eliminating risks of climbing and working at height. More accurate topographical readings of construction sites are also generated.

李智偉(助理工程師)

創新意念:航拍機照片製成三維模型

特點:測量師需耗用大量時間繪畫地盤的地形圖,甚至無法到達某些

範圍,以至影響繪圖的準確性。採用航拍相機後改變了整個運作模

式,測量師可以利用照片處理軟件,把空中拍得的相片製成仔細的三

維模型。

效益:節省測量師巡察地盤的時間,減少攀爬和高空工作的風險,並

能蒐集更準確的地形數據。

January 2018 2018年1月 February 2018 2018年2月

Kwok Wai-hung, Worker

Idea: Custom-made Zero-G Arm

Description: As the workforce continues to age, workers bear the burden of extensive drilling work, so in 2016 Gammon imported the ZeroG Arm, which requires mounting on a scissor platform. The Gammon Zero-G Arm features an innovative enhancement that allows the weight of the arm to be supported by hydraulics.

Benefits: The low-cost enhanced features not only improve productivity but allow workers to drill more safely.

郭偉雄(工友)

創新意念:度身訂製零重力機械臂

特點:面對工人老化,工人又需進行大量鑽鑿工作,金門在2016年

引進零重力機械臂,只要把它固定在剪式升降台上便能施工。同時,

為了令鑽鑿工作變得更加輕鬆,郭偉雄以先進的液壓裝置支撐整個機

械臂的重量。

效益:新增的先進功能成本低廉,不但能提升生產力,而且令鑽鑿工

作更加安全。

Innovator of the Month每月創意之星 快訊 News

The Record • Issue 1/2018 | 13

Innovator of the Month每月創意之星News 快訊

Ryan Liao Sheng-da, Assistant EngineerAlvin Yee Ka-wun, Building Engineer

Idea: Plant Coordinator

Description: Traditionally, it has been difficult to register plants because they are always moving from place to place. The automatic Plant Coordinator solves that problem through using Gambot (a software robot with AI) to input all relevant information for any plant and then to provide auto-reminds – such as for plant inspections – through Gambot via the GPS beacon.

Benefits: The Plant Coordinator automates a formerly complex and time-consuming process, and also makes it easier for plant inspectors to find plants.

廖勝達(助理工程師)

余嘉煥(建築工程師)

創新意念:機械設備協調技術

特點:工程團隊經常移動地盤的機械設備,追蹤它們的紀錄有一定的

挑戰性,因此團隊利用Gambot(金門自行研發的人工智能軟件機械人)

輸入有關設備的所有資料,然後透過Gambot的GPS定位信號系統,自

動作出適當提示,例如檢查設備。

效益:機械設備協調技術把從前複雜而費時的工序簡化,檢查員亦更

容易尋找指定的機械設備。

Tony Fan, Assistant Engineer

Idea: Measuring concrete workability by 3D scanning

Description: The top three workability tests for fresh concrete – slump, slump-flow and flow-table testing – are massively repetitive work for technicians, who have to perform the testing and write down results manually. The Structure Sensor® is a 3D sensor that makes all three tests possible using an iPad only.

Benefits: Improves testing accuracy and traceability, promotes technicians’ work efficiency and alleviates the work burden on workers.

范天苑(助理工程師)

創新意念:三維掃描技術量度混凝土和易性

特點:新拌混凝土出廠前須進行和易性測試,例如坍度、坍流度或流

動台測試,技術員每日須多次重複進行測試並以人手記錄結果。現在

利用Structure Sensor®三維掃描傳感器配合iPad平板電腦能令測試工

作更加便捷。該測試方法同樣適用於各地盤。

效益:改善測試的準確性和數據可追溯性,提升技術員的工作效率,

舒緩工人的工作負擔。

March 2018 2018年3月 April 2018 2018年4月

14 | The Record • Issue 1/2018

Gammon is proud to be the first company in Asia to be compliant with the ISO 20400 standards for sustainable procurement.

The assessment was conducted by third-party evaluators Action Sustainability, who played a leadership role in developing the standard for Australia, the UK and worldwide. ISO 20400 was developed by around 50 nations, in liaison with international organisations such as the United Nations and the Organisation for Economic Co-operation and Development through a four-year consultation process.

“With this new standard, you have access to a robust framework that covers

all areas of procurement and supply chain management, from strategic to operational,” says Action Sustainability’s Director Jean-Louis Haie.

金門非常高興成為亞洲首家符合國際可持續採購標

準評估ISO 20400的公司。

評估過程由獨立第三者Action Sustainability諮

詢公司進行。Action Sustainability在澳洲、英國,

以至全球的ISO 20400標準發展具舉足輕重的領導

地位。ISO 20400由大約50個國家共同開發,與多

個國際組織,如聯合國和經合組織等,經四年時間

磋商而成。

Action Sustainability總監Jean-Louis Haie表

示:「新標準涵蓋採購及供應鏈管理上所有環節,

能就企業的策略規劃至實際執行,提供一個完整

框架。」 1

Gammon recognised with CarbonCare® Label 榮獲低碳關懷標籤

Gammon Construction, along with 37 other major corporations, was awarded the CarbonCare® Label 2017 on 1 December 2017 at the Happy Valley Race Course.

The award is jointly organised by Carbon Care Asia and CarbonCare InnoLab, and this year’s theme was “From ESG to SDG: Sustainability in Action”, which explored how corporate actions can align with the United Nations global sustainable development goals (SDGs).

In 2017, Gammon made even greater strides in reducing its carbon footprint and was awarded the level 3 CarbonCare® label. Compared to the company’s baseline, a 41.3% reduction of carbon intensity has been achieved (excluding Joint Venture and Singapore Projects).

「低碳關懷標籤」頒授典禮於 2017年12月1日假跑馬

地馬場舉行,金門與其他37家企業同場接受嘉許。

頒授典禮由低碳亞洲及低碳想創坊合辦,

2017年的主題為「從ESG到SDG:永續發展 坐言

起行」,探討企業如何能配合聯合國訂定的全球可

持續發展目標。

金門努力減少碳足跡,在2017年錄得更好成

績,獲頒贈第三級「低碳關懷標籤」。相對最初參

與計劃時,金門已成功減少排放二氧化碳41.3%

(聯營項目及新加坡項目除外)。1

健康、安�及環保 Health, Safety and Environment

Annual Stand Down highlights worker safety反思會提升安全意識

Gammon’s 12th Stand Down, an important annual safety event, took place on 21 November 2017.

The latest Stand Down focused on the fact that safety, and in particular safety at heights, continues to be of crucial concern for the construction sector, which saw 31 fatalities in the preceding year.

Over the course of a play-and-stop video

presentation, Gammon employees discussed recorded accidents and what might have been done to prevent them.

The Stand Down discussions came up with concrete ways to avoid such accidents in future.

「安全反思會」是金門一年一度的重要活動,第12

屆會議已在2017年11月21日成功舉行。

這次會議特別聚焦於高空工作的安全,這亦

是業界一直關注的重要事項,在前一個年度曾發

生31宗有關的致命事故。

會議中播放了多段視頻簡介,參與的同事就

多個意外事故進行討論,並提出應及早採取的預

防措施。

與會者在「安全反思會」中總結了多項實質方

案,以防止類似的意外再度發生。1

The ISO 20400 sustainable procurement standard, an Asian first亞洲首家公司接受ISO 20400可持續發展採購標準評估

–41.3%reduction of carbon intensity achieved

成功減少排放二氧化碳41.3%

The Record • Issue 1/2018 | 15

Health, Safety and Environment 健康、安�及環保

from. With the theme, Together for Tomorrow, the Sustainability Month was four weeks of activities and events in Hong Kong, Shenzhen, and Singapore – all of them touching on the key themes of our sustainability framework: safety, environment, health and wellbeing, community engagement and innovation for a better, more sustainable business.

Fair TradeThe Fair Trade event, held on 8 November, with its market and products such as snacks, bakery goods, handicrafts, green tea, spices, and skincare and coconut products, was a huge success. Everybody loved learning more about improving equity in international trade and securing better trading conditions for marginalised workers through shopping and interacting with Fair Trade traders.

Held at Devon House, Quarry Bay, together with long-term Gammon partner charities, Hong Chi Association and the Tung Wah Group of Hospitals, the event was an opportunity to promote and sell the social enterprises handicraft and bakery products, arousing colleagues’ care and raising funds to help those less fortunate than ourselves.

Innovation LabThis Innovation Lab was held at the Jao Tsung – I Academy, a wonderful heritage restoration project near Mei Foo – the perfect spot to find inspiration, which is precisely what 12 bright young minds from across the business did, working together to develop solutions to two worker welfare-related challenges.

The first was a self-contained “pop-up” workers rest area with everything “built-in” that could be easily assembled but was robust enough to withstand more than a light rain shower. The second was a shelter for cut-and-bend areas to reduce the risk of heat stroke and improve working conditions. The results were a huge success in terms of innovation of new products and the young innovators enjoyed the event to the fullest.

Sustainability Strategy WorkshopOne of the highlights of Sustainability Month was bringing together over 40 staff from across the

November 2017 was Gammon Sustainability Month, which is an opportunity to demonstrate our leadership in sustainable construction and reaffirm our commitment to a better quality of life and living environment in a safe and sustainable manner.

The organising team planned a wide range of activities for everyone to enjoy, share and learn

Gammon Sustainability Month金門可持續發展月

16 | The Record • Issue 1/2018

健康、安�及環保 Health, Safety and Environment

business for a full-day workshop to consider how to build our strategy for sustainability (top right). A cross-section of staff from both project operations and support teams were invited, including both present, emerging and future leaders in the business, as well as the Next Generation Panel on Sustainability.

Creative juices flowed and there were some great outcomes from the workshop that will be used in the development of the new strategy for sustainability in the coming months.

金門把2017年11月定為「可持續發展月」,藉此展示有能力領導

可持續發展建築,並重申金門的承諾,要以「安全」和「可持續

發展」的態度,創造更優質的生活和環境。

統籌委員會在香港、深圳和新加坡安排了一連四星期的活

動,讓員工從參與中學習和分享。「可持續發展月」以「共創.

新天」為主題,所有活動均圍繞金門的可持續發展架構,包括

安全、環境、健康、員工的福祉、與社群的連繫,並以創新思

維營造更蓬勃和可持續發展的商機。

公平貿易

在11月8日舉行的「公平貿易市場」圓滿成功。當日銷售的產品

大受歡迎,有零食、烘焙食品、手工藝品、綠茶、香料、護膚

用品和椰子產品等。同事透過這次購物活動及與公平貿易商交

流,認識更多如何改善國際間的公平貿易,為被邊緣化的工人

爭取更佳的貿易條件。

「公平貿易市場」在�魚涌德宏大廈舉行,金門與長期合

作的慈善機構匡智會和東華三院再度攜手,推廣和銷售社會企

業的手工藝品和烘焙食品,喚起同事關懷弱勢社群,並為他們

籌募善款。

創新實驗室

饒宗頤文化館是鄰近美孚的一個文化保育項目,亦是舉行「創

新實驗室」,捕捉創意靈感的理想場地。當日12位來自不同業

務範疇的年青才俊聚首一堂,為兩項與工人福祉有關的挑戰項

目研究解決方案。

第一項是一個能自給自足的「快閃」休息站。站內預設所

需的設施,能快速組裝,足以在陰晴不定的天氣下提供休息屏

障。第二項是一個遮蓋鋼筋剪切和彎曲區的帳篷,用以減低工

人中暑的風險和改善工作環境。活動空前成功,不但順利創造

新產品,各位創新先鋒亦樂在其中。

可持續發展策略工作坊

「可持續發展月」的另一個重點項目,是組織40多位來自不同

業務範疇的同事出席一整天的工作坊,商討如何訂定未來的可

持續發展策略(右上)。出席的同事均是現任項目運作和支援部

門的領導,潛質優秀的才俊和未來的業務接班人,包括「新世

代可持續發展小組」成員。

工作坊中創意洋溢,取得多項具建設性的成果,將在未來

數月用以訂定全新的可持續發展策略。1

The idea of “Pop-up” worker rest area from young minds.年青才俊提出「快閃」休息站的創新意念。

The Record • Issue 1/2018 | 17

Health, Safety and Environment 健康、安�及環保

Construction Safety Conference looks to the future安全會議 放眼未來This year’s well-received Construction Safety Conference was successfully held on 1 February with around 900 guests in attendance.

The Conference embraced the theme of “Technology Adoption and Design for Safety”.

Albert Wong, Hong Kong Science and Technology Parks Corporation Chief Executive Officer, encouraged coordinated efforts among all industry players in order to propel the industry forward. Professor Goh from the University of Singapore talked next, sharing Singapore’s experience in Design for Manufacturing and Assembly, while Barry Davies from Britain’s Environmental Resources Management (ERM) talked on the subject of Human Factors, giving inspiration to human behaviours. Speakers from Gammon also shared an in-depth perspective on a range of topics to showcase how innovation and design creates positive impacted on safety.

In recognition of our colleagues, subcontractors and frontline workers’ efforts in exercising safety, the Zero Harm Awards Presentation was incor-porated into the conference. Congratulations to the Singapore Mayflower Station project and Gammon’s Dongguan Pristine Metal Works, which took this year’s honours in the Zero Harm Project - Grand Award.

「2018金門安全會議」於2月1日圓滿舉行,超過900名嘉賓應邀出席活動。

今年的會議以「善用新科技 設計重安全」為主題。

香港科技園行政總裁黃克強勉勵業界要群策群力,推動建造業邁步向前;新加坡

國立大學Yang Miang Goh 教授分享當地在「簡化製造及裝配過程的設計」方面的經驗

和效益;來自英國Environmental Resources Management的Barry Davies的講題為「設

計上的人為因素」;多位金門同事亦深入剖析不同的專業範疇,展現創意和設計如何推

動安全。

金門特別在會議上舉行「零傷害」頒獎典禮,表揚同事、分判商和前線員工實踐安

全施工。恭賀新加坡美華地鐵站項目及金門的原創金屬結構有限公司獲得今年的「零傷

害」工程項目的終極大獎!1

18 | The Record • Issue 1/2018

健康、安�及環保 Health, Safety and Environment

24th Considerate Contractors Site Award Scheme第24屆公德地盤嘉許計劃

Project 項目 Category 組別 Award 獎項

Ground Investigation – Urban and Surrounding Islands (Term Contract)場地勘探 – 市區及周圍島嶼(定期合約)

Public works – RMAA工務工程 – 維修、保養、 改建及加建工程

Gold AwardOEMPA* – Merit金獎傑出環境管理 – 優異獎

Foundations Works for Lyric Theatre Complex and Extended Basement in Zone 3B at the West Kowloon Cultural District 西九文化區演藝劇場地基工程

Non-Public works – New Works 非工務工程 – 新建工程

Gold AwardOEMPA – Silver金獎傑出環境管理 – 銀獎

Taikoo Place Phase 2A Development (One Taikoo Place)太古坊2A 發展項目(太古坊一座)

Non-public works – New Works 非工務工程 – 新建工程

Silver AwardOEMPA – Bronze銀獎傑出環境管理 – 銅獎

Development of Kwu Tung North and Fanling North New Development Areas – Advance Works and First Stage Works – Stage 2 Ground Investigation Works古洞北及粉嶺北新發展區前期及第一期工程 – 第二階段勘探工程

Public Works – New Works 工務工程 – 新建工程

Bronze Award銅獎

Construction Safety Week 建造業安全周

*OEMPA: Outstanding Environmental Management and Performance Award傑出環境管理理獎

Executive Director C C Wai (first right) shared Gammon’s experience on

enhancing safety performance.執行董事衛志忠(右一)分享金門在提升

安全表現的經驗和心得。

Gammon was in full support of the Construction Safety Week. This industry-wide safety promotion campaign, organised by the Development Bureau and the Construction Industry Council was a success, engaging all industry players.

Award Presentation CeremonyAt the Award Presentation Ceremony of the 24th Considerate Contractors Site Awards on 30 May 2018, eight projects from Gammon took home awards that recognised their tireless efforts in promoting community services, safety, health and environmental protection. Special congratulations to all the projects and frontline colleagues recognised for their safety performance!

Safety Video Competition Award 2018On 21 May, Safety Video Competition 2018 was held to encourage the industry's participation in promoting safety. Gammon was awarded a Silver Prize, three Bronze prizes and a Merit Prize. Innovative Safety Initiative Award 2018The project team of Taikoo Place Phase 2A Development (One Taikoo Place) won a Gold, Silver and Bronze at the Award Presentation Ceremony, with their innovations applied on-site.

金門全力支持「建造業安全周」。這是一項由發展局及建造業議會合辦的

安全推廣活動,業界積極參與,使活動取得成功。

頒獎典禮

「第24屆公德地盤嘉許計劃」頒獎典禮在2018年5月30日盛大舉行,金門

一共有八個工程項目奪得獎項,多位前線同事亦獲得嘉許,肯定了團隊在

推廣社區服務、安全、健康及環保各方面的努力。謹恭賀各個得獎項目!

最受歡迎安全短片比賽2018

頒獎典禮於5月21日舉行,目的是推動業界加強安全表現。金門獲得一

銀、三銅及一個優異獎。

2018 創意工程安全獎

於頒獎典禮中,太古坊2A發展項目(太古坊一座)工程團隊憑�創新技

術,囊括一金, 一銀及一銅的驕人成績。1

The Record • Issue 1/2018 | 19

Gammon at 60: Looking back, looking ahead回首豐盛60載 昂然邁進新世代

Sixty years ago, a group of engineers who had come to Hong Kong to work on the Kai Tak runway extension established a local presence. Since then, Gammon has

grown together with the people of Hong Kong, providing the infrastructure and facilities that have enabled the city to prosper. During the shared journey, the city has transformed from the unrest of the 1960s into the renowned international hub it is today, and we are proud to have developed into a leading construction company with 8,000 employees and an annual turnover of US$2.5 billion.

What we’ve achievedGammon’s accomplishments have been notable in several areas, but especially in relation to the use of innovative technology, sustainable construction and worker health and safety.

Advances in technology From the beginning, Gammon has pioneered the use of technology in its projects to achieve more efficient and cost-effective outcomes. These include cutting-edge technologies such as robotics, Building Iinformation Modelling (BIM), Design for Manufacture and Assembly (DfMA), 3D printing, virtual reality, sensors and RFID tags and many others.

One of the greatest game-changers, has been BIM. This technology has revolutionised the construction industry by making projects more buildable and reducing wastage.

Gammon has been promoting BIM by hosting conferences held in 2015 and 2017. During these events, advocates of BIM from Gammon, government and the client side came from Hong Kong, the US, Singapore and other countries to share their insights on the power of BIM for wider adoption of the technology.

When it comes to robotics, Gammon has introduced the first curtain-wall installation

焦點特寫 FOCUS STORY

robot in Hong Kong in order to encourage automation. We also signed a Memorandum of Understanding with ATOUN Inc., a subsidiary of Panasonic, and Shun Hing Systems Integration Company Limited on the use and development of new exoskeleton technology to further improve construction safety, efficiency and productivity. In Singapore, we used a Rectangular Tunnel Boring Machine – or RTBM – for the first time in the city to construct Havelock Station on the Thomson-East Coast Line. This technology was chosen to avoid disrupting the busy neighbourhood overhead. It also meant that about 30 per cent fewer man hours were required to build the station than the traditional cut-and-cover method.

Worker safety and healthWorker safety and health are particularly important to Gammon, which introduced the Zero Harm programme in 2009. Gammon later introduced its Zero Harm Bold Commitments, which pledged to embed Zero Harm into every aspect of the Company’s work and supply chain, while extending it to the industry at large.

A major feature of Gammon’s approach to safety is its company-wide safety event – Stand Down – which is held every year to gather around 15,000 of our people and frontline workers, subcontractors, union representatives and clients and business partners to cultivate a positive safety culture – Prove it Safe.

To protect the health of workers, in August 2011 Gammon pioneered the deployment of nurses on-site. The programme has nurses making regular visits to the Company’s Hong Kong project sites to provide free health checks.

Another first in the local construction

The Record • Issue 1/2018 | 21

Gammon has pioneered the use of BIM.

金門率先引用建築信息模擬。

Gammon pledges to embed zero harm into its business.金門承諾把零傷害融入

日常業務運作之中。

FOCUS STORY 焦點特寫

industry was our Virtual Reality Safety Training programme (top left). Using virtual reality to simulate a construction-site environment in 2D and 3D, this approach allows trainees to experience different scenarios from a first-person perspective, a much more effective training method than classroom lectures.

Environmental initiativesWe uphold sustainable construction, with the approach – use wisely, waste less and emit less. This is another area where Gammon has excelled.

According to the Company’s Sustainability Roadmap 2020, launched in 2012, Gammon strives to manage all projects using methods and materials that minimise impact on the environment. To promote sustainability across the industry, Gammon has held two industry-wide sustainability conferences.

Sustainable procurement has played a major role in this quest to build more environmentally-friendly projects. Gammon is the first and only construction company in Hong Kong to use B5 biodiesel in 100% of our owned plant and equipment on our solo project sites, the first to introduce recyclable

HDPE (high-density polyethylene) barriers, and we use over 95 per cent FSC/PEFC certified sustainable timber and plywood for formwork. In addition to buying greener construction materials, Gammon has been creating new markets for sustainably-sourced materials that benefit suppliers selling not only to Gammon but to the industry as a whole.

The programme – Green & Caring Site Commitment – is designed to promote good sustainability practices, commending sites that have reduced environmental impacts, innovated for better performance and demonstrated a concern for worker welfare. As a result of this programme, Gammon has fostered a stronger culture of safety, corporate social responsibility and greening the environment.

Developing our peopleSince 2012, we have been addressing the labour shortage in construction by making a career in the industry more viable and attractive. One of the key approaches in this effort is to provide young people with marketable skills through on-the-job training programmes, such as the Construction Industry

22 | The Record • Issue 1/2018

Certified sustainable timber is used for100% of Gammon’s own formwork.

由金門進行的模板工序均選用認證的可持續木材。

Council (CIC) Contractor Training Scheme and Advanced Construction Manpower Training Scheme.

Also offered is the Contractor Cooperative Training Scheme (CCTS) organised by CIC. From 2011 to 2017, Gammon has trained 756 workers in 17 trades under the scheme. In 2017, we added a new master apprenticeship scheme in coordination with the Vocational Training Council that provides training in plastering, brick-laying and tiling, as well as façade design.

As a result of these training programmes and our efforts to humanise the construction workplace, we were recognised as one of the most attractive employers in Hong Kong by Universum, a global leader in employer attractiveness research. For our work under the CCTS, we received the Hong Kong Institute of Human Resource Management’s Grand Award of the Year and Excellent Business Partner

Award. Gammon was awarded four Gold awards at the Employers Luncheon and Appreciation Ceremony 2018 organised by CIC.

Where we are headedIn recent years, a number of important themes have emerged that will shape the direction Gammon will take in years to come. Foremost among these is innovation, which is critical for delivering value to clients and thriving in an increasingly competitive construction market.

Going digital, breaking boundaries Gammon has earned a well-deserved reputation for innovation through the adoption of technologies such as BIM. But BIM is only part of the story. To fully capitalise on the efficiencies made possible by these technologies, Gammon needs to bring them together under a single digital umbrella.

This is happening through Gammon’s innovation strategy, covering DfMA and Integrated Digital Project Delivery (IDPD), with BIM as the chief driver.

In the construction industry, DfMA integrates construction plans through BIM, allowing production and prefabrication to be undertaken off-site and streamlining installation processes on-site, thus enhancing safety and efficiency. Off-site prefabrication of construction components, such as the steel beams and trusses can be manufactured at Gammon’s Pristine Metal Works facility.

IDPD, on the other hand, is the approach taken for managing construction projects by integrating all processes and supply chain in the construction lifecycle. The key to this approach is advanced information communications and smart technologies,

焦點特寫 FOCUS STORY

The Record • Issue 1/2018 | 27

I have a great sense

of belonging at Gammon. Compared to 45 years ago, Gammon has created a new outlook in construction services, with a commitment to cultivate talents.”Wong Ping Poung, Construction Advisor

Gammon is very people-oriented. It

cares for its staff and puts people’s safety first. Taking a leading role in the industry, it provides training for staff on safety and skills and technology. It is a corporate that is responsible toward society.”Chan Ho Kee, Sr General Foreman

FOCUS STORY 焦點特寫

60年前,一群充滿熱誠的工程師

初次踏足香港,為啟德機場跑

道進行擴建工程,繼而在這城

市扎根。自此,金門為香港建

造基建項目和設施,與這城市

及香港人一起成長。1960年代的香港仍有待發展,至今

已是享譽全球的國際樞紐,金門亦已打穩根基,成為一

家首屈一指、擁有8,000員工、每年營業額達25億美元的

建築公司。回顧這段發展旅程,金門引以為榮。

成就非凡60年的努力,奠定了金門的非凡成就,其中我們尤其注

重創新科技的應用、可持續發展、工人的健康和安全。

卓越技術金門率先引用先進科技建造項目,以提升效率和取得

更佳的成本效益,包括採用機械臂、建築信息模擬

(BIM)、簡化製造及裝配過程的設計(DfMA)、三維立

體打印、虛擬實境、傳感器及無線射頻辨識標籤等等。

BIM是一項革命性的建造技術,它改變了整個建造

業,增強項目的建築效益,同時減少消耗。

金門一直積極推廣BIM的效益,在2015年及2017

年已分別舉辦兩個BIM大型會議,邀請香港、美國、新

加坡等地倡導BIM 技術的專家,與金門、政府、客戶

代表等聚首一堂,分享對BIM技術的真知灼見,期望更

廣泛利用這項建築科技。

應用機械臂方面,金門率先在香港採用機械臂安裝

幕牆,推動自動化。我們已經與Panasonic的附屬公司

ATOUN Inc.及信興系統工程有限公司,就使用和發展

連身機械裝甲衣科技簽署諒解備忘錄,藉以提升工程

的安全、效率及生產力。在新加坡,我們首次採用矩

形隧道鑽挖機建造湯申–東海岸�的合樂地鐵站,代

替明挖回填的建造方法,這不但避免影響地面繁忙的

社區,同時節省工時約30% 。

工人安全及健康工人的安全和健康對金門重中之重。金門在2009年推

出「零傷害」計劃,並逐步推行該承諾,強調要把「零傷

28 | The Record • Issue 1/2018

Across the region, Gammon is exploring new business opportunities through its shareholder interest in Vietnam contractor COFICO, particularly in that country’s home market of Vietnam, but also in other countries across Southeast Asia. Gammon has shown its steadfast commitment towards sustainability development, and this commitment remains as strong as ever. In our Sustainability Report 2017 we have reflected on our progress in achieving the objectives of our Sustainability Roadmap 2020 before we embark on the next stage of our sustainability journey. in 2018 we will release a new framework looking towards 2025 and beyond.

With a 60-year record of successes and its continuing commitment to people, to environment and technological innovation, Gammon can look back with pride on all that it has achieved during this period and look forward with confidence to a future of even greater success.

Application of DfMA in data centre projects.於數據中心工程項目採用簡化製造及裝配過程的設計。

Sensors to track plant status. 利用傳感器掌握機器的狀況。

underpinned by BIM. The concept is being realised by all Gammon’s divisions to strength innovation development and enhance productivity.

Working in parallel with the business units, Gammon has established a new entity, Digital G, for exploiting the commercial potential of the innovations produced in-house as well as the new wave of digital and smart construction technologies around the world. This will not only serve Gammon’s own projects but also those outside Gammon in Hong Kong and other parts of Southeast Asia.

Another example is the façade division, Entasis Limited. Its team of professionals have used DfMA by removing tedious manual operations through digitalisation, automation and AI technology. Together with its library of curtain-wall systems, Entasis can save clients around 20-30 per cent of the time needed for a typical design cycle.

On the other hand, Into G, which was established by Gammon, is the first of a new breed of interior fit-out specialists in Asia, specialising in high-quality fit-out solutions for hospitality, residential, retail and office projects.

焦點特寫 FOCUS STORY

The Record • Issue 1/2018 | 29

害」理念注入公司每一個範疇和供應鏈,繼而推廣至整

個建造業。

安全方面,「反思會」是一項重要的安全推廣活動,

每年約15,000人出席,包括員工、前線工人、分判商、

工會代表、客戶及業務合作夥伴,一同為金門營造正面

的安全文化 –「謹慎驗證·以策安全」。

為保障工人的健康,金門在2011年8月派護士定期探

訪地盤,為工人提供免費的健康檢查,開創業界的先河。

另一項創新措施,是率先在香港建築界推行虛擬實

境訓練課程。金門用虛擬實境技術模擬二維及三維地盤

環境,讓學員以第一身角度體驗不同景況,比在課堂教

學更加靈活有效。

環保措施 金門持守可持續建築,強調「善用、減耗、減排」原則,

是另一個表現出色的範疇。

我們在2012年推出《2020可持續發展路線圖》,致

力以最環保的方法和物料建造項目,並已舉行兩次「可

持續發展會議」,推動整個建造業界邁向可持續發展。

要建造環保項目,可持續發展的採購方針非常重

要。金門成為香港首家在其業務運作中應用B5生化柴

油的承建商,採用可循環再造的高密度聚乙烯製造屏障

及超過95%森林管理委員會/森林驗證認可計劃(FSC/

PEFC)認證的可持續發展木材和三夾板。除了選購更環

保的建材,金門更為可持續發展的原材料創造新市場,

讓供應商受惠,他們不但可售予金門,更可供應整個建

造業界。

「環保與關愛承諾」是為推廣優良的可持續發展措施而

設的計劃,嘉許有效減少對環境的影響、以創意提升工程

表現,以及關懷工友福祉的工程項目。這計劃成功強化金

門的安全文化、推動企業社會責任和綠化環境。

培育人才我們正視建造業勞工短缺的情況,自2012年起採取措

施,致力令建造行業更富生氣和更具吸引力,包括透過

在職培訓計劃,如建造業議會的「建造技工合作培訓計

劃」及「進階工藝培訓計劃」,為年青人提供具市場價值

的技能訓練。

我們又參與建造業議會舉辦的「承建商合作培訓計

劃」,在2011至 2017年間,已透過這計劃培育17 個工

種共756名工人。在2017年,我們與職業訓練局合作舉

辦全新的學徒訓練計劃,提供批盪、砌磚和砌瓦,以至

幕牆設計的培訓。

我們致力培育人才,以及為建造業工友創造更佳的

工作環境,獲全球僱主吸引力調查機構Universum嘉許

為香港最具吸引力的僱主之一。在今年的「僱主午餐會

暨嘉許典禮」,更榮獲四項金獎。

邁步向前金門已訂定一系列規劃未來發展方向的題案,引領業務

繼續邁步向前,當中首重「創新」。因為市場競爭日趨劇

烈,創新能為客戶提供更具價值的建築項目,推動金門

的業務繼續欣欣向榮。

數碼管理 突破疆界金門率先在業界引用BIM等先進建築科技,贏得創新的

美譽。但BIM只是眾多新技術之一,要從科技領域中取

得最佳效益,金門必須把這些新技術融匯貫通,以數碼

方式整合和管理。

我們主要以BIM掀頭,驅動「簡化製造及裝配過程的

設計」(DfMA)和「綜合數碼建造方案」(IDPD)。

在建造過程中,BIM可以配合DfMA整合施工計劃,

在工廠進行生產和預鑄,簡化在工地的安裝程序,從而

提升安全和效率,例如在金門的原創金屬結構廠預製鋼

樑和桁架等建築組件。

另一方面IDPD能整合建築生命週期中所有流程和持

分者,妥善管理整個建築項目。關鍵是以BIM為基礎,

輔以先進的資訊流通和智能科技。金門各業務正逐步實

踐相關措施,強化這項創新的研究,以及提高整體的生

產力。

我們已成立一家新公司Digital G,與其他業務單位

互相配合,開發內部研發的創新項目、它們的商業潛

力,及全球新一浪的數碼及智能建築技術。Digital G不

僅為金門的項目提供服務,更可惠及全港以至東南亞地

區的其他建築項目。

主理幕牆的大師有限公司(Entasis Limited)是另一

個成功例子。專業團隊採用 DfMA技術,以數碼化、自

動化和人工智能科技,取代繁瑣的人手操作。配合公司

的幕牆系統庫,能為客戶節省20%至30%傳統設計週期

所需的時間。

另一方面,金門成立的Into G是亞洲第一家能提供

另類室內裝修的專家,特別為酒店、住宅、零售及辦公

室項目提供高質素的裝修方案。

亞洲區業務方面,金門與越南承建商COFICO簽署

合作,並會積極發掘當地,以至東南亞地區新的業務契

機。金門承諾推動可持續發展,多年來未曾鬆懈。我們

曾在《2017年可持續發展報告》中闡述下一階段的發展

旅程,即2020年可持續發展路線圖的目標及取得的成

效。在2018年,我們會啟動一個全新架構,推動2025

年及以後的可持續發展。

過去驕人的業績,加上持守對員工、環境及創新科

技的承諾,金門對60年來取得的成就引以為傲,並有信

心繼往開來,在未來的歲月爭取更佳成績。1

2006The Gammon-Skanska-MBEC Joint Venture successfully completes the Hong Kong-Shenzhen Western Corridor, a symbol of strengthening ties between the Hong Kong Special Administrative Region and the government of Guangdong Province.金門-Skanska-中鐵大橋局聯營順利完成香港-深圳西部通道,

標誌著香港特別行政區與廣東省兩地政府的緊密聯繫。

1958Establishes a permanent presence in Hong Kong.金門扎根香港。

1969Completes the China Light and Power Tsing Yi power station, which serves the community’s increasingly intensive electricity needs.中華電力青衣發電廠落成啟用,配合香港社會不斷增長的

電力需求。

1972Completes the Connaught Centre (now named Jardine House). At the time of its completion, it is the tallest building in Hong Kong and in Asia.康樂大廈(今怡和大廈)落成,成為當時香港及亞洲最高建

築物。

1982Receives the contract awards of Exchange Square, which commands some of the highest rentals in Central nowadays. 獲得建造中環交易廣場合約。現時它是中環最具租賃價值

的寫字樓之一。

2000Completes One Raffles Link, Singapore, which was designed by world-renowned New York architect Kohn Pedersen Fox.享譽全球的紐約建築師Kohn Pedersen Fox設計的新加坡One

Raffles Link順利落成。

2009Introduction of the Zero Harm programme.推出「零傷害」計劃 。

1979Completes the first of nine MTR stations for the modified initial system.完成地鐵早期修正系統首九個地鐵站。

2015The Shatin Central Link Contract no. 1111: Hung Hom North Approach Tunnels project wins the Gold Award in Construction Industry category, marking the fifth time Gammon has won the Gold Award in this category.沙田至中環合約 1111紅磡站鐵路隧道建造工程奪「香港環

保卓越計劃 - 建造業組別金獎」,這是金門第五度獲此殊榮。

Takes the industry lead with its launch of VR Training. 推出虛擬實境訓練,創業界先河。

2013Works with fuel supplier to launch the use of B5 biodiesel in our plant and with our equipment, and becomes the first and only construction company in Hong Kong to use B5 biodiesel in 100 per cent of our owned plant and equipment on our solo project sites.與燃油供應商合作,成為香港首家,亦是唯一一家建築公司,在

自己的項目地盤,所有機械設備和器材全部採用B5 生物柴油。

Wins a HK$8.66 billion contract for the construction of the Tuen Mun-Chek Lap Kok Link – Southern Connection Viaduct Section in Hong Kong, the largest solo contract ever awarded to Gammon Construction.奪屯門至赤角連接路-南面連接路高架道路項目,合約總值

86.6億港元,是金門歷來最大的單一合約。

MILESTONES 發展里程碑

1978 1988 1998 2008 2018

2016Gammon and Balfour Beatty are among the six contractors who are the first to achieve the Kitemark for BIM by the business standards company, BSI.金門及保富集團憑建築信息模擬

成為全球首六間獲得英國標準學

會BSI Kitemark標誌的承建商。

With Singapore’s first Rectangular Tunnel Boring Machine adopted in construction of Havelock Station, Gammon brings the latest railway expertise to Asia. Second contract for the Thomson Line awarded to Gammon by Land Transport Authority.首次引入矩形隧道鑽挖機進行新加坡合樂地鐵站工程,把

最新的鐵路建造技術帶到亞洲。該工程為金門第二次奪得

由新加坡陸路交通管理局批出的湯申合約。

19681958

1994Excellent coordination work and project management at the Peninsula Hotel Extension project wins us Hong Kong’s 1996 Building Manager of the Year Gold Award.半島酒店擴建工程展現傑出的統籌及項目管理,

奪「1996香港傑出建造經理金獎」。

2003Publishes the local industry’s first Sustainability Report.出版香港建造業界第一份《可持續發展報告》。

2018Express Rail Link West Kowloon Terminus Station North (Leighton-Gammon Joint Venture) will be completed.廣深港高速鐵路香港段九龍總站北(禮頓-金門聯營)將於年內竣工。

2017Becomes the first Asian construction company to be assessed for the ISO 20400 standard on sustainable procurement. 成為首家接受國際可持續採購標準ISO 20400評估的亞洲建

築公司。

The first in Hong Kong to be awarded the Structural Steel CE Mark EN 1090 with the highest Execution Class, Class 4. 成為香港首家獲結構鋼材CE Mark EN 1090最高第四評級的

公司。

Introduces the magically invisible chair – Chairless Chair Exoskeleton – and becomes the first construction company in the world to apply this exoskeleton in construction. 推出神奇「無形」雙腳外骨骼

機械人,成為全球首家在建築

工程中採用外骨骼技術的建築

公司。

Innovates Gambot, an in-house software robot with AI and a smart conversational user interface. Gambot captures, analyses and categorises site information automatically, and is applied across the business. Gambot是一個由內部研發、具有人工智能和聊天介面的智

能軟件,能自動收集、分析和分類工地資料,已在金門業務

中廣泛應用。

2012Acquires shareholding interests in COFICO.成功取得COFICO股權。

Completes the Zero Carbon Building, the first of its kind in Hong Kong, as well as Opus Hong Kong, the first residential project in Asia designed by Pritzker prize-winning architect Frank Gehry. 零碳天地落成,成為香港首幢零碳建築;完成傲璇(Opus Hong

Kong)項目,這是Pritzker Prize得獎建築師Frank Gehry首個亞

洲住宅項目。

2011Green & Caring Site Commitment is launched to promote good sustainability practices.推出「環保與關愛承諾」計劃,

推廣優良的可持續發展措施。

Pioneers the deployment of nurses on-site.派遣護士進駐地盤,創業界先河。

Completes the world-class Government Headquarters of the Hong Kong Special Administrative Region, a showcase of sustainable construction and environmental design, winning more than 20 awards.世界級的香港特別行政區政府總部落成,展現可持續建築和環保

設計,贏得超過20個獎項。

2005Appoints Major Trade Contractor with Mei Cheong Construction Company Ltd as its Macau Partner to construct the HK$3 billion Venetian Macao-Resort-Hotel tower in Cotai, Macao.夥拍澳門夥伴美昌建築有限公司,獲委任為主要工種承建商,

興建總值30億港元的金光大道威尼斯人度假村酒店大樓。

2008 Completes the One Island East project, making it the first contractor in Hong Kong to use the new technology BIM.港島東中心項目落成,成

為香港首家採用建築信息

模擬這項嶄新技術建造項

目的承建商。

Establishes the Virtual Design & Construction Department to enforce the adoption of BIM.成立虛擬設計與建造部,強化BIM技術的應用。

Hong Kong Sustainability Award recognises Gammon榮獲「香港可持續發展大獎」

On 16 November 2017, Gammon beat off stiff competition to win the Grand Award and the Hong Kong Sustainability Award at the Award Presentation Ceremony of the inaugural Hong Kong Sustainability Award 2016/17.

Gammon Director, Tony Small expressed his delight in his acceptance speech, “I would like to thank all of my colleagues at Gammon as well as our many partners for this award as we would not be successful without their combined efforts in striving for a more sustainable business.” Gammon’s commitment is showcased by being the first construction company in Hong Kong to introduce the use of B5 biodiesel to our operations, introducing modular fabrication and creating platforms to promoting sustainability, such as the Sustainability Conference and Sustainability Month.

In being awarded a Grand Award, Gammon is proud to be recognised to have always followed the principles of good use of energy, reduced consumption and reduced emissions to promote sustainable development.

金門在2017年11月16日首屆「香港可持續發展獎2016/17」頒獎典禮中光芒四射,

從眾多競爭對手中脫穎而出,奪得「香港可持續發展獎」及整個項目的「大獎」。

董事薛東尼接受獎項時欣然說:「衷心感謝所有員工和業務夥伴,如果沒有

Awards 獎項

Young project engineer wins Silver for safety improvements 年青項目工程師奪銀獎

Project Engineer Martin Man was recognised with a Silver Award (Management category of Organisation/Company) at the Outstanding Hong Kong Employees in Occupational Safety and Health Award Scheme.

The award scheme is organised by the Occupational Safety and Health Council, Labour Department, members of the Labour Functional Constituency of the Legislative Council and employee representatives of the Labour Advisory Board to appreciate employees across the industries who make significant contributions to improving occupational safety and health systems or work environments.

項目工程師文智�奪得「第十屆全港傑出職安健員工嘉許計劃」機構/企業–管理層組別銀

獎。

這嘉許計劃由職業安全健康局、勞工處、立法會勞工界議員、勞工顧問委員會僱員代表

合辦,表揚致力推動職安健系統和改善工作環境的優秀員工。1

他們的支持,金門不可能在可持續發展的業務旅程中取得豐碩成果。」金門是

香港首間在日常運作中採用B5生物柴油的建築公司,在建築過程中採用預製模

組,舉行「可持續發展會議」和「可持續發展月」等,突顯金門推廣可持續發展的

決心和承諾。

是次獲獎,肯定了金門一向依循「善用、減耗、減排」的原則,推動可持續

發展。1

“As an engineer, we must help solve the frontline workers’ problems, and provide safe solutions to ensure

that works can be carried out safely.”Martin Man, Project Engineer

“作為項目工程師,我們的責任就是協助前線解決問題,安�地進行施工。”項目工程師文智�

30 | The Record • Issue 1/2018

獎項 Awards

Gammon shone at the Construction Industry Council (CIC) Innovation Award, sharing a first prize in the category of Construction Safety with its business partners and taking a second prize for Construction Productivity.

Held on 14 December 2017, the award recognises industry players that have spearheaded the development of innovative concepts and practical applications in construction.

金門在「建造業議會創新獎」大放異彩,與業務夥伴合作研發的項目在建造安全組別勇

奪第一殊榮,另獲建造生產力第二名。

頒獎典禮於2017年12月14日舉行,嘉許業界開發創新的工程意念,並在建造項目

中付諸實行。1

Prize for Construction Safety建造安全第一名

Prize for Construction Productivity建造生產力第二名

Awardees得獎者

The Hong Kong Polytechnic University and Gammon 香港理工大學及金門

Ted Lawton, Senior Engineering Development Manager 高級工程發展經理Ted Lawton

Innovation創新項目

Bio-Inspired Anti-Vibration Exoskeleton仿生物抗振結構

K-Frame for the erection of segmental bridges K字形架橋機

Benefits效益

A remarkable reduction of hand-arm vibration by 90% was demonstrated由工具傳送至手臂的振動力

減少達九成

A new range of machines to enhance cost efficiency, productivity and sustainability一系列新型架橋機,有效降低成

本,提高生產力,達至可持續發展

CIC awards 2 Innovation Award prizes

奪兩項創新獎項

The annual Institution of Mechanical Engineers Hong Kong Branch Annual Dinner was held on 16 May 2018 to celebrate excellence. Gammon was honoured to be awarded Winner of the 4th Year Best Project Award for expertise of Design for Manufacture and Assembly (DfMA) in Construction. The cutting-edge approach is exemplified by the Steelwork projects for West Kowloon Cultural District.

The award was a recognition of the efforts of Gammon’s Steel Fabrication Department, the team of which has long endeavoured to provide steelwork services from pre-construction and design to fabrication and installation in ever safer, more environmentally friendly, efficient and cost-effective ways. For example, at the M+ Museum project (right), DfMA was also adopted for fabrication of the truss, saving 50 per cent in terms of resources and in the time required to undertake the work.

英國機械工程師學會香港分部在2018年5月16日舉行週年晚宴,並嘉許

表現卓越的項目。金門以「簡化製造及裝配過程的設計」這先進方案建造

西九龍文化區的鋼鐵工程項目(右圖),展現專業建造才能,獲大會頒贈

「第四屆最佳項目獎」。

這獎項肯定了金門鋼結構部的努力。該團隊多年來致力提供全面的

專業鋼結構服務,由建造的前期工作、設計,以至鑄造和裝嵌一應俱

全,並採取安全、環保、高效率和具成本效益的方法施工。在M+博物館

項目,金門以「簡化製造及裝配過程的設計」鑄造鋼架,成功節省資源及

工期50%。1

DfMA contributions honoured 「簡化製造及裝配過程的設計」獲嘉許

The Record • Issue 1/2018 | 31

Awards 獎項

Formwork Hoist System receives accolades 模板升降台系統獲優異獎

Gammon is pleased to have been honoured at the Hong Kong Awards for Industries (HKAI) Ceremony on 18 December 2017, at which The Hon Mrs Carrie Lam Cheng Yuet-ngor, the Chief Executive of the Hong Kong Special Administrative Region officiated.

The HKAI received a total of 233 entries in 2017 and Gammon’s contribution was recognised with an Equipment and Machinery Design Certificate of Merit for the Formwork Hoist System.

The annual awards aim to recognise the outstanding achievements of Hong Kong enterprises in pursuit of high technology and high value-added activities, and to commend excellence in various aspects of their performance.

香港特別行政區行政長官林鄭月娥在2017年12月18日為「香港

工商業獎」主持頒獎典禮,金門欣喜在典禮中獲嘉許。

「2017香港工商業獎」共收到233項參賽項目,金門的模板

升降台系統獲贈「設備及機器設計優異證書」。

一年一度的「香港工商業獎」旨在表揚香港企業在邁向高

科技、高增值的過程中取得的成就,以及在不同範疇的傑出

表現。1

Formwork Hoist System模板升降台系統The formwork hoist adopts rack and pinion technology. With a self-climbing system, the need to use a tower crane to relocate the track from upper floors is eliminated. The formwork hoist boosts productivity, enhances safety and results in a 50 per cent reduction in costs.

這模板升降台系統採用齒輪及齒條驅動技術,備有自行爬升功能,毋須使用塔式起重機從上

層移動軌道。它有效提升生產力和安�,並大幅節省生產成本高達五成。

In December 2017, Gammon was invited by Singapore Environmental Council (SEC) to receive the Project Eco-Office Certification Award at a special appreciation lunch graced by Singapore’s Minister of Environment and Water Resources, Masagos Zulkifli.

The Project Eco-Office award is given based on environmentally friendly practices in office spaces, and Gammon has been following the Green Site Office Checklist for many years when building site offices. In fact, Gammon built the first temporary construction site office that was certified by the SEC in the 2012 Project Eco-Office Awards. Gammon has continued to certify its site offices through the scheme in the years since.

2017年12月,金門獲新加坡環境委員會邀請,出

席由新加坡環境及水源部部長Masagos Zulkifli 主

持的午餐會,接受「環保地盤辦公室」證書。

「環保地盤辦公室大獎」嘉許辦公室內環境

友善的措施。金門多年來按照《綠色地盤辦公室

檢查清單》的要求設置地盤辦公室,事實上,早

在2012年設置第一個臨時地盤辦公室時已獲此證

書,自此多個地盤均獲嘉許。1

Singapore awards'eco-office' certification

獲贈「環保地盤辦公室」證書

32 | The Record • Issue 1/2018

獎項 Awards

In a ceremony held on 4 May 2018 at the Hong Kong Convention and Exhibition Centre, Gammon took away a slew of awards at the Hong Kong Awards for Environmental Excellence (HKAEE).

In particular, Gammon was honoured with a 10th Anniversary Special Award, which was awarded this year in recognition of companies and organisations that have provided continued support to the HKAEE over the past decade.

The awards ceremony was presided over by the Chief Executive of the Hong Kong Special Administrative Region The Hon Mrs Carrie Lam, Secretary for the Environment Wong Kam-sing and Chairman of the Environmental Campaign Committee Lam Chiu-ying, among other honourable officiating guests and industry leaders and representatives.

The HKAEE and the Hong Kong Green Innovations Awards aim to encourage local companies, regardless of their size, to improve and implement green strategies and improve overall environmental standards in the construction industry. This year’s HKAEE saw a record high number of entries at 1,614, four times more than in 2008, when the awards were first launched.

金門在2018年5月4日假香港會議展覽中心舉行的「香港環境卓

越大獎」頒獎典禮中奪多項殊榮。

我們更在典禮中榮獲「十周年特別大獎」。大會今年特別頒

贈這獎項感謝過去十年一直支持「香港環境卓越大獎」的機構。

頒獎典禮由香港特別行政區行政長官林鄭月娥、環境局局

長黃錦星及環境運動委員會主席林超英主持,並邀得多位業界

翹楚和合辦機構的代表出席。

「香港環境卓越大獎」及「香港綠色創新大獎」鼓勵業界以

嶄新的綠色方案締造更佳的環境效益。參與今年「香港環境卓

越大獎」的機構達1,614家,創歷年新高,較2008年推出該獎項

時增加四倍。1

Awardee得獎

Award獎項

Gammon Construction金門建築

10th Anniversary Special Award – Certificate十周年特別大獎 — 證書

Proposed Commercial Development at NKIL No.6512 Kwun Tong, Hong Kong新九龍內地段第6512號商業發展項目

Construction Sector Award – Silver

Outstanding Green Leadership Award

建造業 — 銀獎

傑出綠色領導大獎

Foundation Works for Ting Wing Stop Development at Tin Shui Wai天水圍天榮站地基工程

Construction Sector Award – MeritOutstanding Green Leadership Award建造業 — 優異獎

傑出綠色領導大獎

Concrete Technology Department混凝土技術部

Hong Kong Green Organization– Certificate香港綠色機構 — 證書

Hong Kong Awards for Environmental Excellence yield winners

奪多項香港環境卓越大獎

The Record • Issue 1/2018 | 33

Corporate Social Responsibility 企業社會責任

Volunteer caring project brings joy to community樂於助人 服務社群

The Tuen Mun – Chek Lap Kok Link project team has spared no efforts in upholding corporate social responsibility.

Typhoon Pakhar and Typhoon Hato struck Hong Kong in August 2017 just before the school term started, causing unprecedented damage to Tung Wan Mok Law Shui Wah School and the Island Hostel, Lantau. A threat to the safety of the students and teachers, some affected areas and facilities were immediately closed and some academic activities were affected as a result.

In consideration of the students’ needs, the project team proactively formed a volunteer team to assist with post-typhoon repair work for the school. The repair work for the campus and the hostel was finally completed in early November. The Hong Kong Student Aid Society recognised the project team’s volunteer community efforts with an Outstanding Award for corporate social responsibility.

On 9 December, along with members of the Tung Wah Group of Hospitals (TWGHs) and the Sha Tau Kok District Rural Committee, the Tuen Mun – Chek Lap Kok Link project team travelled to the villages of Sai Lau Kong and Kat O on an island in northeast Hong Kong. There they engaged in a caring programme that aims to improve the quality of life for seniors by carrying out renovation work on flats and the surrounding

environment. The team was rewarded by happy smiles on the elderly villagers’ faces.

In 28 March 2018, the closing ceremony of “Outreach Community Support Services for Rural Areas” Programme was officiated by Mr Yam Mun-ho, District Social Welfare Officer (Tai Po/North), Social Welfare Department. Over 200 elderly and guests attended the event to share the happiness. The Sha Tau Kok District Rural Committee expressed their appreciation for Gammon volunteers' contributions and support by presenting souvenirs and with a thank-you letter.

屯門至赤臘角連接路項目團隊竭力履行企業社會責任。

颱風帕卡和天鴿在2017年8月臨近開學之際接

連吹襲香港,大嶼山東灣莫羅瑞華學校和石壁宿舍

在颱風吹襲下嚴重受災,部分損毀的校舍和設施威

脅師生的安全,須即時關閉,因而影響教學活動。

為顧及學生的學習需要,項目團隊自發組成義

工隊協助學校修葺校園和宿舍。去年 11 月初,所

有復修工程經已完成。香港學生輔助會特意頒贈

「傑出企業社會責任獎」,以表揚項目團隊為社區作

出貢獻。

此外,項目團隊又參與關愛社群活動,在12月9

日聯同東華三院及沙頭角區鄉事委員會的成員探訪

位於香港東北的西流江和吉澳漁村,為當地長者修

葺房屋和附近環境,藉此改善他們的生活質素。村

民臉上的笑容,就是金門義工隊的最佳回報。

2018年3月28日,社會福利署大埔及北區福利

專員任滿河為「固鄉情鄉郊長者支援服務計劃」主持

閉幕典禮,超過200位長者及嘉賓出席。沙頭角區

鄉事委員會在典禮中致贈紀念品和謝函,感謝金門

義工長期的支持和貢獻。1

34 | The Record • Issue 1/2018

企業社會責任 Corporate Social Responsibility

Gammon shinesin 49-floor Walk Up

攀登怡廈 健步如飛On Sunday, 18 March 2018, Gammon’s relay team

won 1st runner up in the Walk Up Jardine Housefundraising event, reaching the top of 49 floors

– 974 steps – at a speed of 4’04”.This year marks the 33rd anniversary of the eventand raised a total of HK$3.3 million for MINDSET,

a Jardine Group philanthropic initiative that promotes mental health in the community and aims to reduce

the stigma of suffering from mental-health issues.

金門健兒在2018年3月18日舉行的「齊步上怡廈」慈善競跑活動中

光芒四射,以4’04” 跑上974級樓梯,抵達怡和大廈49樓,

勇奪男女子混合接力賽亞軍。

怡和集團成立的慈善機構「思健」每年舉辦「齊步上怡廈」,今年

的活動踏入33週年,籌得善款330萬港元,用作宣揚精神健康的

訊息,並減少社會大眾對精神病患者的偏見。1

Gammon employees participated in the Jardine Sports Association Long Distance Run held on 15 Apri 2018, crossing the finishing line at the Main Dam, Plover Cove Reservoir.

Frankie Ho, General Manager of Construction Services Department was there to cheer the runners on, a gesture of support appreciated by the runners, who took home a number of awards.

Congratulations go out to everybody who was part of a day of fun and exertion.

怡和體育會在2018年4月15日舉行長跑比賽,金門健兒在船灣淡水湖的賽道

疾步如飛,到達大美督主霸的終點時光芒四射。

建築服務部總經理何兆良親身到場為金門健兒吶喊助威,我們的跑手亦

全情投入,奪得多個獎項。1

Runners shine atlong-distance event長跑好手光芒四射

The Record • Issue 1/2018 | 35

Corporate Social Responsibility 企業社會責任

Myanmar youth equipped with computer literacy裝備緬甸年青人學習電腦知識“We felt like a lottery winner when we heard the news!” Studer Trust, a Myanmar organisation that aims to provide education facilities and other community development projects, said in excitement when Gammon donated 90 desktop computers for youth in Myanmar.

Studer Trust undertakes charitable work for students, while Gammon is committed to helping young people achieve their dreams, a shared vision that is fostering a collaboration that is equipping young people with computer literacy.

The large numbers of donated computers will be used at newly established computer centres under Studer Trust.

金門捐贈90台桌上電腦予緬甸慈善組織Studer Trust,他們表示:「我們

收到消息時,興奮的心情恍如中獎!」Studer Trust主要為當地提供教育設

施及進行社區發展項目。

Studer Trust為莘莘學子提供慈善服務,金門致力幫助年青人成就夢

想,兩家機構志同道合,合作為當地年青人提供電腦硬件,幫助他們學

習電腦知識。

今次捐贈的電腦大部分在Studer Trust新落成的電腦中心使用。1

Ceremony kicks off Guangzhou

Walkathon行路上廣州

The 8th Gammon Walkathon to Guangzhou kicked off on 1 December 2017 to raise funds for Hong Chi Association’s daily operation expenses, so as to help people with intellectual disability. Thanks to the support of colleagues, sub-contractors and suppliers, they successfull raised HK$285,270. A total of around HK$2 million has been raise since 2010.

Around 20 participants took part in the event, including Gammon colleagues,

Hong Chi tutors and students, who walked a three-day, two-night tour to Guangzhou.

第八屆「金門滿愛心 行路上廣州」慈善步行在2017

年12月1日舉行,為匡智會籌募經費,並為智障

人士提供服務。感謝同事、分判商和供應商的支

持,籌得善款285,270港元。自2010年舉辦這步

行活動以來,累計籌得善款近200萬港元。

當日約20位參加者,包括金門同事、匡智會

的導師及學員,一同參與這三日兩夜步行上廣州

的旅程。1

36 | The Record • Issue 1/2018

企業社會責任 Corporate Social Responsibility

Awards and a workout全情投入運動與競賽

On 7 January, the Construction Industry Council (CIC) held its Happy Long Run at the Tai Po Training Ground. Together with all the other participants, 20 Gammon staff demonstrated their strong spirit by bracing the freezing rain and cold. All of Gammon’s enrolment fees were donated to the Construction Charity Fund to support those in the construction industry who are in need.

At the same occasion, the Construction Plant Operation Competition Awards Presentation was held. Gammon won the Champion Award in the Crawler Crane Category, Best Operator in the Individual Crawler Crane Category and 1st Runner Up in the Gantry Crane category at the Awards Presentation.

建造業議會在1月7日假大埔訓練場舉行「2018建造業開心跑暨嘉年華」。二十位金

門精英與其他參加者無懼大雨寒風,全情投入競跑,展現過人毅力。金門參與是

次活動的報名費,全數捐贈予「建造業關懷基金」,惠澤業界有需要的人士。

議會亦於活動中舉行

「建造業機械操作比賽」頒

獎典禮。金門勇奪「履帶式

起重機操作」 冠軍及「龍門

式起重機操作」亞軍 。1

議會亦於活動中舉行

「建造業機械操作比賽」頒

獎典禮。金門勇奪「履帶式

起重機操作」 冠軍及「龍門

1

Gammon took great pleasure in sponsoring the Lap Dog Challenge 2017, organised by the Lighthouse Club on 4 November 2017. The event raised around HK$1.2 million for the Lighthouse Club Hong Kong Benevolent Fund.

Gammon athletes, including Executive Director CC Wai, contributed to the event’s total of 3,685 laps, or a total of 1,474 kilometres.

Lap DogChallenge 2017跑圈王者挑戰賽

金門贊助明建會在2017年11月4日舉行的

「2017明建會跑圈王者挑戰賽」,活動為明

建會慈善基金籌得善款約120萬港元。

衷心感謝金門健兒包括執行董事衛志忠

的參與。活動健兒一共競跑3,685個圈,合共

1,474公里!1

The Record • Issue 1/2018 | 37

Corporate Social Responsibility 企業社會責任

On 21 April 2018, Gammon’s Central Kowloon Route–Kai Tak West project team organised an environmentally friendly tree-planting day at the project’s Community Liaison Centre in Ma Tau Kok.

The Plantation Day event involved not only the project team staff, but also key stakeholders including Kowloon City District Council Member Mr Lai Kwong Wai, students and teachers from SKH Holy Carpenter Primary School and resident site staff.

“Plantation Day not only strives to uplift the quality of the nearby living environment, but also promotes the awareness of tree conservation to our young generation,” Alan Yan, Gammon’s Contracts

Manager said at the opening speech.To make Ma Tau Kok a greener

place, participants promised to contribute their time and effort for the growth of the saplings.

中九龍幹線-啟德西項目團隊在2018年4月21

日假馬頭角社區聯絡中心舉行環保植樹日。

植樹活動得金門同事和項目的主要持分者

鼎力支持,包括九龍城區議員黎廣偉、聖公會

聖匠小學的師生及駐地盤工作人員。

合約經理殷偉明為活動致開幕辭時表示:

「金門舉辦這植樹日不單為改善附近的環境質

素,更期望喚起年青一代關注保育樹木。」

參加者承諾會身體力行照顧幼樹,以營造

更翠綠的社區環境。1

Plantation Day promotes green living植樹日推廣綠色生活

On 21 April 2018, Gammon’s Central Kowloon Route–Kai Tak West project team organised an environmentally friendly tree-planting day at the project’s Community Liaison Centre in Ma Tau Kok.

The Plantation Day event involved not only the project team staff, but also key stakeholders including Kowloon City District Council Member Mr Lai Kwong Wai, students and teachers from SKH Holy Carpenter Primary School and resident site staff.

“Plantation Day not only strives to uplift the quality of the nearby living environment, but also promotes the awareness of tree conservation to our young generation,” Alan Yan, Gammon’s Contracts

Plantation Day promotes green living植樹日推廣綠色生活

Project WeCan prepares students for the future協助學生規劃錦繡前途

Gammon is throwing its weight behind Project WeCan, a business-in-community initiative to assist students to seize learning opportunities and be better prepared for their future careers.

On 21 April 2018, Gammon assisted with the Career Exploration Day organised by Project WeCan. The event featured interactive “job tasters” for the students that were designed to be interesting and engage the students. Gilbert Tsang, Executive Director attended the opening ceremony, which was graced by Paul Chan, the Financial Secretary.

Project WeCan representatives described the event as an unqualified success, saying: “Feedback was very positive from students, principals, teachers and parents!”

金門鼎力支持「學校起動」計劃,體現社企共勉精神,並鼓勵學生努力爭取學習

機會,為日後升學及就業做好準備。

「學校起動」計劃在2018年4月21日舉辦「生涯規劃日」,讓同學透過與在

職人士互動交流,親身體驗與自己職業性向匹配的行業或職位。啟動典禮由

財政司司長陳茂波主持,金門積極參與活動,執行董事曾慶祥並出席典禮,

以示支持。

「學校起動」計劃的代表形容活動十分成功:「我們收到大量學生、校長、

老師和家長正面的回應,感到非常鼓舞。」1

Plantation Day promotes green living

38 | The Record • Issue 1/2018

A day of family fun 同樂享天倫

Striking a balance between work, fun, exercise and family life is critical for one’s well-being. The annual Gammon Family Fun Day is the perfect example of that spirit.

The event, held on 3 December 2017 at the Sheung Shui Community Sports and TWGHs Ms Tso Lung Campsite, saw 4,500 participants come together for a day of games, a soccer competition, virtual reality experiences, a lucky draw, wall climbing, a rope-class challenge, war games and a lot more.

With the theme of “One Flip Big Leap”, Gammon’s Chief Executive Thomas Ho explained “In today’s rapidly changing society, we need to keep abreast of the times, abandon our ingrained patterns of thinking, embrace change and find joy.”

With thanks for the engagement of a number of NGOs, the Fun Day has become a thrilling occasion for Gammon families.

企業社會責任 Corporate Social Responsibility

工作、娛樂、運動、家庭各方面取得平衡,才能活出

健康人生。一年一度的「金門家庭同樂日」讓員工與親

友樂聚一堂,正好展現這工作生活平衡的精神。

同樂日在2017年12月3日於上水展能運動村及東

華三院馬草壟營地舉行,約4,500位金門員工和親友

出席,參與當日特設的遊戲活動、足球比賽、虛擬實

境體驗、大抽獎、攀石、跳大繩、野戰等節目,樂也

融融。

同樂日以「一轉念·非常掂」為主題,金門總裁何安

誠解釋說:「現今社會瞬息萬變,我們要與時並進,摒

棄固有思維,學習從改變中尋找樂趣。」

我們更衷心感謝所有參與這同樂日的慈善機構,

為金門大家庭的成員送上這愉快難忘的一天!1

The Record • Issue 1/2018 | 39

BUILDING

13416 Central Police Station Conservation and Revitalisation Project Central Police Station Compound, Central

13568 West Rail Tsuen Wan West Station TW5 Cityside Property Development Chinachem Group

13613 Main Contract Works for Harmony Redevelopment at Hysan Avenue, Hoi Ping Road Hysan Development Co Ltd and Sunning Road, Causeway Bay, Hong Kong

13616 Exteral Façade Sub-contract Works for West Rail Tsuen Wan West Station, Chinachem Group TW5 Cityside Property Development

13618 Main Contract for the Proposed Residential and Commercial Development at TKOTL Wheelock Properties No. 126, Area 68B2, Tseung Kwan O, New Territories

13620 Exteral Façade Sub-contract Works for Harmony Redevelopment at Hysan Avenue, Hysan Development Co Ltd Hoi Ping Road & Sunning Road, Causeway Bay

13628 Main Contract for Redevelopment of Somerset House in Taikoo Place Taikoo Place Holdings Ltd

13632 Nominated Sub-Contract for Design, Supply and Installation of Façade System for Chinachem Group Proposed Office Development at No. 1 Hennessy Road, Hong Kong

13633 Main Contract Works for Property Development at Tseung Kwan O Town Lot Chinachem Group No. 93, Hong Kong

13638 Main Contract for Proposed Commercial Development at NKIL No. 6512 Kwun Tong Link & Nan Fung Group

13668 Main Contract Works for URA Project TKW/1/002 Urban Renewal Authority – Ma Tau Wai Road / Chun Tin Street, Kowloon

13683 Main Contract for the Proposed Residential Development at TPTL 214 at Fo Yin Road, Great Eagle Holdings Ltd Pak Shek Kok, Tai Po, New Territories

13693 No. 1 Plantation Road, Hong Kong The Wharf (Holdings) Ltd

13698 Main Contract for Proposed Residential Development TPTL 226 Pak Shek Kok, K. Wah International Holdings Ltd Tai Po, New Territories

13699 The Fullerton Ocean Park Hotel Hong Kong Site Formation, Foundation and Parkland (Hong Kong) Ltd Superstructure Main Contract

13704 Hang Seng Bank Headquarter Glass Curtain Wall Strengthening Works Hang Seng Bank Ltd

13708 Proposed Residential Development (LOHAS Park Package 9) at Site J of the Remaining Wheelock Properties Portion of TKO Town Lot No. 70, Tseung Kwan O Area 86, Tseung Kwan O, New Territories

13720 How Ming Street Defect Rectification Work at Proposed Hotel Development Glorious Sun Group 97 How Ming Street, KTIL 805, Kwun Tong

16615 Kam Fung Overseas Chinatown Phase II Guang Dong Kam Fung Real Estate Investment

Co Ltd

CIVIL

13295 West Island Line, Contract No. 705 – KET Station & Overrun Tunnel MTR Corporation

13337 West Island Line, Contract C704 MTR Corporation Sai Ying Pun and HK University Stations and Sai Ying Pun to Kennedy Town Tunnels (Gammon-Nishimatsu WIL Joint Venture)

13428 Contract no. 3/WSD/11 HKSAR Water Supplies Dept Construction of Pressure Management and District Metering Installations in Western, Central, Eastern, Sai Wan, Kowloon West and Tsuen Wan East Major Fresh Water Supply Zones

13468 Contract P533 Midfield Concourse Works Airport Authority Hong Kong

13518 Contract No. HY/2012/07 HKSAR Highways Dept Tuen Mun-Chek Lap Kok Link – Southern Connection Viaduct Section

13662 Ocean Park Tai Shue Wan Water World Project, Contract No. TSW-C006 – Waterpark Ocean Park Corporation – Main Building Works

13703 L1 Contract for Lyric Theatre Complex and Extended Basement Project West Kowloon Cultural District Authority

Job no. Title Client

MAJOR CURRENT CONTRACTS LIST

40 | The Record • Issue 1/2018

MAJOR CURRENT CONTRACTS LIST

Job no. Title Client

13718 Central Kowloon Route – Kai Tak West HKSAR Highways Dept

13728 TMCLK Northern Connection Tunnel Buildings, Electrical and Mechanical Works HKSAR Highways Dept

15205 Express Rail Link, Contract 811B MTR Corporation West Kowloon MTR Terminus Approach Tunnel (South) (Gammon-Leighton Joint Venture)

15207 Express Rail Link, Contract 810A MTR Corporation West Kowloon Terminus Station North (Leighton-Gammon Joint Venture)

15208 Shatin to Central Link Contract No. 1111 MTR Corporation Hung Hom North Approach Tunnels (Gammon-Kaden Joint Venture)

15211 Contract No. 05/HY/2012 HKSAR Highways Dept Management and Maintenance of High Speed Roads in New Territories East and HK Island (2013-2019) (Gammon-Welcome Joint Venture)

15230 The Sai Sha Road Widening Works for the Comprehensive Development Sun Hung Kai Properties at Shap Sz Heung, Sai Kung North, Hong Kong

CONSTRUCTION SERVICES

15635 Steelwork & Noise Barrier for Shatin to Central Link 1111 Gammon-Kaden JV – Main Contractor

15643 Tuen Mun-Chek Lap Kok Link – L3 Parapet HKSAR Highways Dept

15652 Express Rail Link, Contract 811B – Canopy Steelworks MTR Corporation

15655 Structural Steelwork for Harbourfront Hotel Extension Hutchison Whampoa Properties (Management & Agency) Ltd

15665 Steelwork for M+ Museum Hsin Chong Construction Co. Ltd

15666 The Hong Kong Polytechnic University - Footbridge Linking Phase 8 Rider Levett Bucknall Ltd

15672 Taikoo Place 2A Superstructure and Footbridge Gammon – Main Contractor

15675 Tai Wai Station – Structural Steelwork Build King Holdings Ltd

15677 MOL Viaduct Enclosure for Tai Wai Station Property Development Build King Holdings Ltd

15678 Main Contract for Construction of Connecting Bridge between Nexxus Building Mutual Capital Ltd and Hang Seng Bank Headquarter

15680 Taikoo Place Phase 2B Steelwork Project – Fabrication & Erection of Steelworks Gammon – Main Contractor

15681 Property Development at West Rail Nam Cheong Station NKIL 6333 – Footbridge Sun Hung Kai Properties

15682 HKSH Eastern District Advanced Medical Centre - Structural Steel Column for Yau Lee Building Construction & Decoration Stage 1 and Exo-skeleton for Stage 2 Co Ltd

15683 Goldin – Strengthen Plate Gammon – Main Contractor

15684 Ocean Park Skylight Gammon – Main Contractor

15685 Clutch Pipe Pile for Lyric Theatre Gammon – Main Contractor

15687 Lyric Theatre L1 Works Gammon – Main Contractor

E&M

13519 HyD Contract HY/2012/07 Tuen Mun – Chek Lap Kok Link – Southern Connection Gammon – Main Contractor Viaduct – E&M Works

13538 MTR SCL Contract 1165 – Building Services for Hin Keng Station, Ma Chai Hang MTR Corporation Ventilation Building and Fung Tak Emergency Access

13553 MTR SCL Contract 1164 – Building Services for Diamond Hill Station MTR Corporation

13641 MVAC, Electrical and Plumbing & Drainage Installation for Proposed Office Hip Hing Construction Ltd – Main Contractor Development at 8-10 Wong Chuk Hang Road, Hong Kong

13642 Electrical Installation NSC for Proposed Office Development at 1 Hennessy Road, CR Construction Co Ltd – Main Contractor Wanchai, Hong Kong

13646 MVAC Installation NSC for Proposed Office Development at 1 Hennessy Road, CR Construction Co Ltd – Main Contractor Wanchai, Hong Kong

13647 Ocean Park Tai Shue Wan Water World Project – E&M Ocean Park Corporation

The Record • Issue 1/2018 | 41

13655 Electrical & ELV Installation NSC for Proposed Commercial Development at Gammon – Main Contractor NKIL 6512 Kwun Tong

13663 MTR Contract K1847-16E(B) Replacement of Air-Cooled Chillers at MTR Stations MTR Corporation and Depots

13666 MTR SCL Contract 1164B – Building Services for SCL Hong Kong Island Section MTR Corporation

13671 M&E Installation Nominated Sub-Contract for Happy Valley Clubhouse Extension Hip Hing Construction Co Ltd – Main Contractor (Ref. CTR/2016/81)

13678 QRC Project Bridge III – Main MEP Contract at GCR Main Building Hong Kong The Hongkong and Shanghai Banking Corporation (CW932872)

13680 Main Contract at Hang Seng Bank Headquarter, 83 Des Voeux Road, Central, Hong Kong Hang Seng Bank Limited

FOUNDATIONS

13472 Shatin to Central Link Contract 1111 Hung Hom North Approach Tunnel Gammon-Kaden JV – Main Contractor (Instrumentation Work)

13534 Contract No HY/2012/07 Gammon – Main Contractor Tuen Mun-Chek Lap Kok Link – Southern Connection Viaduct Section – Geotechnical Instrumentation and Monitoring

13565 Contract C1469-14C Tunnel Improvement Works at TKL MTR Corporation

13590 Contract No DC/2015/01 HKSAR Drainage Services Dept Relocation of Sha Tin Sewage Treatment Works to Caverns – Ground Investigation

13609 Foundation Works for Lyric Theatre Complex and the Extended Basement in Zone 3B West Kowloon Cultural District Authority at West Kowloon

13625 Automatic Deformation Monitoring System (ADMS) for Monitoring of West Rail Line Sun Hung Kai Architects and Engineers Ltd Viaduct Piers U277 to U280 in Yuen Long, N.T.

13629 Contract No. NE/2015/08 Development of Kwu Tung North and Fanling North New HKSAR Civil Eng & Dev Dept Development Areas – Advance Works and First Stage Works – Stage 2 Ground Investigation Works

13637 Contract No. GE/2016/03 Marine Ground Investigation and Geophysical Surveys HKSAR Civil Eng & Dev Dept (Term Contract)

13639 Demolition and Associated A&A Works for Taikoo Place 2B Development Swire Properties

13658 Shatin to Central Link Contract 1123 – Exhibition Station and Western Approach Leighton-China State JV – Main Contractor Tunnel Subcontract Agreement No. 1123/SC108 – Strain Gauge Installation and Monitoring for ELS Work

13659 Contract No. GE/2017/34 HKSAR Civil Eng & Dev Dept Provision of Soil and Rock Testing for Public Works Laboratories – Marine

13660 Foundation Works for Tin Wing Light Rail Stop Property Development at Best Vision Development Ltd TSWTL No. 23, Area 33 Tin Shui Wai, New Territories

13661 Contract No. GE/2017/06 HKSAR Civil Eng & Dev Dept Ground Investigation – Urban and Surrounding Islands (Term Contract)

13665 Foundation, Pipe Pile and Sheet Piling Works for West Rail Yuen Long Station Property Sun Hung Kai Properties Development, Yuen Long Town Lot No. 510 New Territories

13669 Site Formation and Foundation Works for Proposed Residential Development at Goldin Financial Holdings Ltd KIL No. 11257 Sheung Shing Street, Homantin, Kowloon

13675 Foundation and Sheet Piling Works for Proposed Residential Development at Gammon – Main Contractor TPTL No 214, Fo Yin Road, Pak Shek Kok

13679 Site Formation, Foundation & Superstructure Main Contract for The Fullerton Hotel Gammon – Main Contractor at Ocean Park, Area B, Ocean Park, Tai Shue Wan - Subcontract for Foundation Works

13685 Development of IE2.0 Project A at Tseung Kwan O Industrial Estate, New Territories Hong Kong Science and Technology Parks Corporation

13692 Design and Construction of Foundation and ELS Piling Works for the Proposed Sun Hung Kai Properties Residential Development at STTL 609 To Shek Street, Shatin, New Territories

13697 Proposed Office Development at 2 Murray Road Central, Survey and Henderson Land Development Co. Ltd Tunnel Monitoring Works

MAJOR CURRENT CONTRACTS LIST

Job no. Title Client

42 | The Record • Issue 1/2018

MAJOR CURRENT CONTRACTS LIST

13702 Contract No HY/2014/09 Nishimatsu Construction Co Ltd – Main Contractor Central Kowloon Route – Ho Man Tin Access Shaft, Ground Investigation Fieldworks including Horizontal Directional Coring, Instrumentation and Drilling Works for the Diaphragm Wall

13705 Ground Investigation Works for Sai Sha Road Widening, Sai Sha Comprehensive Sun Hung Kai Properties Development, Shap Sz Heung, Sai Kung North, NT

13706 Central Kowloon Route, Kai Tak West, Subcontract for Foundation Works Gammon – Main Contractor – Highways Department (Contract No. HY/2014/07)

13709 Contract No. GE/2017/41 HKSAR Civil Eng & Dev Dept Provision of Soil and Rock Testing for Public Works Laboratories – NT East

13710 Foundation Works for The Hong Kong Palace Museum for the West Kowloon Cultural West Kowloon Cultural District Authority District Authority (Contract No CC/2017/04/057)

13712 Design and Construction of Pipe Pile Wall and Foundation Works for Commercial Sun Hung Kai Properties Development at KTIL 240, 98 How Ming Street, Kwun Tong, Kowloon

13714 Contract No. GE/2018/22 HKSAR Civil Eng & Dev Dept Provision of Soil and Rock Testing for Public Works Laboratories – Urban

13715 Excavation and Lateral Support and Foundation Works for Proposed Commercial Nan Fung Group Development at New Kowloon Inland Lot No 6556, Kai Tak Area 1F Site 2, Kai Tak, Kowloon

13716 Foundation, Pile Caps and ELS Works for the Proposed Residential & Commercial Shanghai Commercial Bank Development at 33-47 Catchick Street, Kennedy Town, Hong Kong

13719 Main Contract for Proposed Demolition Works Subsection 3 of Section P of Hong Kong Science and Technology Parks Tseung Kwan O Town Lot No. 39 and Extensions Thereto Corporation

13722 Design and Construction of Foundation Works for Development of IE 2.0 Project C Hong Kong Science and Technology Parks Advanced Manufacturing Centre at Tseung Kwan O Industrial Estate, New Territories, Corporation Contract No PD/WC/200

SINGAPORE

14267 Contract No. QX13-032 – Supply and Replacement of Turnout Bearers / Sleepers in SMRT Trains Ltd the North / South and East / West Line of existing SMRT Network

14268 Contract T210 – Design and Construction of Mayflower Station for Land Transport Authority Thomson East Coast Line

14271 Contract T271 – Construction of Havelock Station for Thomson Line Land Transport Authority

14278 Track System Replacement Involving Installation of Concrete Sleepers on East West Line SMRT Trains Ltd

14279 Contract T273A Supply & Installation of Mechanical Services for Mandai Depot and Land Transport Authority Bus Depot

14280 Contract T275A Supply & Installation of Electrical for Mandai Depot Land Transport Authority

14287 Design, Supply, Installation of North South Transmission Cable Tunnel NS1 Samsung C&T

14292 Global Switch Suite C7 Upgrading Works 250kw Global Switch

14295 Bored Piling Works for 6-storey Data Centre with Basement at Woodlands Global Switch

14297 Supply and Installation of Mechanical Services for the Additional Works at Land Transport Authority Permanent Way and Locomotive Workshop Building

14298 Contract T3152, Supply, Installation and Monitoring of Instruments for Contract T315 Land Transport Authority

14299 Condenser Water Upgrade Works – Riser 4 Replacement and Filtration Systems Global Switch

14300 Proposed 6-Storey Data Centre with Underground Fuel Storage Tanks at Global Switch Woodlands Avenue 12

14302 Sub Contract Works – Secant Bored Piling Works at Location 2 (Jacking and Ed Zublin Receiving Shafts) and Location7 (Jacking Shaft only) For Contact No:C170026T00 – Construction of Service Tunnels, Access Shafts and Ancillary Works in Jurong Island

Job no. Title Client

The Record • Issue 1/2018 | 43

樓宇建築

13416 中區警署保育及活化計劃 中區警署建築群

13568 西鐵荃灣西站五區城畔物業發展項目 華懋集團

13613 銅鑼灣位於希慎道、開平道和新寧道利園三期項目主要工程合約 希慎興業有限公司

13616 西鐵荃灣西站五區城畔 住宅發展項目外牆裝飾分判工程 華懋集團

13618 新界將軍澳68B2區126號地段 住宅及商業發展項目主要工程合約 會德豐地產

13620 銅鑼灣位於希慎道、開平道和新寧道利園三期項目外牆裝飾分判工程 希慎興業有限公司

13628 太古坊常盛大廈重建項目主要工程合約 太古坊控股有限公司

13632 香港軒尼詩道1號辦公室發展項目 華懋集團

設計、供應及安裝外牆裝飾系統的指定分判商

13633 將軍澳第93號地段物業發展項目主要工程合約 華懋集團

13638 觀塘NKIL No. 6512地段商業發展項目主要工程合約 領展及南豐集團

13668 市區重建局項目TKW/1/002主要工程合約 – 九龍馬頭圍道/春田街 市區重建局

13683 新界大埔白石角科研路地段214號住宅發展項目主要合約 鷹君集團有限公司

13693 香港種植道一號 九龍倉集團有限公司

13698 新界大埔白石角地段226號住宅發展項目主要合約 嘉華國際集團有限公司

13699 香港富麗敦海洋公園酒店 聯(香港)有限公司

地盤平整、地基及上層結構工程主要合約

13704 �生銀行總行玻璃幕牆強化工程 �生銀行有限公司

13708 新界將軍澳86區第70號地段J地盤餘下位置(日出康城第九期)住宅發展項目 會德豐地產

13720 觀塘805號地段巧明街97號酒店發展項目執漏工程 旭日集團

16615 錦峰華僑城二期 廣東錦峰地產投資有限公司

土木

13295 西港島合約705 – 堅尼地城站及越位隧道 港鐵公司

13337 西港島合約704 – 西營盤及香港大學站,以及西營盤至堅尼地城隧道(金門 - 西松西港島聯營) 港鐵公司

13428 合約編號3/WSD/11主要食水供應區的水壓管理及區域監測裝置建造工程 – 包括西區、中區、東區、西環、 香港特區政府水務署

九龍西及荃灣東

13468 合約P533機場中場客運廊工程 香港機場管理局

13518 合約編號HY/2012/07屯門至赤�角連接路 – 南面連接路高架道路段 香港特區政府路政署

13662 海洋公園大樹灣水上樂園項目 合約編號TSW-C006 – 水上樂園 – 主樓建築工程 海洋公園

13703 L1合約 – 西九文化區演藝綜合劇場及擴建地庫項目 西九文化區管理局

13718 中九龍幹線 – 啟德西工程 香港特區政府路政署

編號 項目 客戶

主要工程合約一覽表

44 | The Record • Issue 1/2018

主要工程合約一覽表

編號 項目 客戶

13728 屯門至赤�角連接路 – 北面連接路隧道大樓及機電工程 香港特區政府路政署

15205 廣深港高速鐵路香港段,合約811B – 西九龍總站隧道(南)(金門 - 禮頓聯營) 港鐵公司

15207 廣深港高速鐵路香港段,合約810A – 西九龍總站(北)(禮頓 - 金門聯營) 港鐵公司

15208 沙中合約編號1111 – 紅磡站鐵路隧道建造工程(金門 – 基利聯營) 港鐵公司

15211 合約編號05/HY/2012 新界東及香港島快速公路之管理及維修(2013-2019)(金門 - 偉金聯營) 香港特區政府路政署

15230 西貢北十四鄉綜合發展計劃 – 西沙路擴闊工程 新鴻基地產

建築服務

15635 沙中合約1111鋼鐵工程及隔音屏障 金門 - 基利聯營 – 總承建商

15643 屯門至赤�角連接路 – L3圍欄 香港特區政府路政署

15652 廣深港高速鐵路,合約811B – 遮篷鋼鐵工程 港鐵公司

15655 海灣軒海景酒店擴建 – 鋼鐵結構工程 和黃地產代理有限公司

15665 M+視覺文化博物館 – 鋼鐵工程 新昌營造有限公司

15666 香港理工大學 – 連接第八期校園之行人天橋 利比有限公司

15672 太古坊第2期A發展項目上層結構及行人天橋 金門 – 總承建商

15675 大圍站 – 鋼結構工程 利基控股有限公司

15677 大圍站物業發展項目 – 馬鞍山高架軌道隔音設施 利基控股有限公司

15678 盈智大廈至生銀行總行連接橋主要合約 盈本有限公司

15680 太古坊2B期鋼鐵工程 – 鑄造及架設鋼鐵工程 金門 – 總承建商

15681 西鐵南昌站NKIL 6333物業發展項目 – 行人天橋 新鴻基地產

15682 養和東區醫療中心 – 第一期工程的結構鋼柱及第二期的外骨架工程 有利承造裝修有限公司

15683 高銀 – 強化板塊工程 金門 – 總承建商

15684 海洋公園天幕工程 金門 – 總承建商

15685 演藝綜合劇場離合器管樁工程 金門 – 總承建商

15687 演藝綜合劇場L1工程 金門 – 總承建商

機電

13519 合約編號HY/2012/07屯門至赤�角連接路 – 南面連接路高架道路段 – 機電工程 金門 – 總承建商

13538 港鐵沙中合約1165 – 顯徑站、馬仔坑通風樓及鳳德緊急救援樓之樓宇設備系統 港鐵公司

13553 港鐵沙中合約1164 – 鑽石山站之樓宇設備系統 港鐵公司

13641 香港黃竹坑道8至10號辦公室發展項目 – 通風及空調系統、電氣、水管及排水設施安裝工程 協興建築有限公司 – 總承建商

13642 灣仔軒尼詩道1號商業中心發展項目 – 電氣工程 華營建築有限公司 – 總承建商

13646 灣仔軒尼詩道1號商業中心發展項目 – 空調系統工程 華營建築有限公司 – 總承建商

The Record • Issue 1/2018 | 45

主要工程合約一覽表

編號 項目 客戶

13647 海洋公園大樹灣水上樂園 – 機電工程 海洋公園公司

13655 觀塘NKIL 6512商業發展項目 – 電力裝置及特低壓系統安裝工程指定分包合約 金門 – 總承建商

13663 港鐵合約K1847-16E(B)港鐵站及車廠更換氣冷式製冷機工程 港鐵公司

13666 沙田至中環合約1164B – 沙中港島段之屋宇設備工程 港鐵公司

13671 跑馬地會所擴建工程(Ref. CTR/2016/81)機電安裝工程指定分包合約 協興建築有限公司 – 總承建商

13678 香港豐銀行總行大廈機電改善工程第三期 (CW932872) 香港上海匯豐銀行有限公司

13680 香港中環德輔道中83號�生銀行總行大廈主要合約 �生銀行有限公司

地基

13472 沙中合約編號1111 – 紅磡站北面接引隧道(裝設儀器工程) 金門-基利聯營 – 總承建商

13534 合約編號 HY/2012/07屯門至赤�角連接路 – 南面連接路高架道路段 – 岩土工程監測 金門 – 總承建商

13565 合約C1469-14C將軍澳隧道改善工程 港鐵公司

13590 合約編號DC/2015/01搬遷沙田污水處理廠往岩洞 – 土地勘測 香港特區政府渠務署

13609 西九3B區演藝綜合劇場及延伸地庫地基工程 西九文化區管理局

13625 自動變形監測系統 新鴻基建築設計有限公司

監控新界元朗西鐵高架橋U277至U280橋墩

13629 合約編號NE/2015/08 香港特區政府土木工程拓展署

古洞北及粉嶺北新發展區前期及第一期工程 – 第二階段勘探工程

13637 合約編號GE/2016/03海上勘探工程及地球物理測量(定期合約) 香港特區政府土木工程拓展署

13639 太古坊2B發展項目 – 清拆及相關的改建及加建工程 太古地產

13658 沙中合約1123 – 會展站及西面連接隧道分判工程合約編號1123/SC108 禮頓 – 中建聯營

– 應變計安裝、挖掘及橫撐監督工程 – 總承建商

13659 合約編號GE/2017/34 提供給工務試驗所的土壤及岩石試驗服務 – 香港水域 土木工程拓展署

13660 新界天水圍33區地段第23號天榮輕鐵站物業發展項目地基工程 邦信發展有限公司

13661 合約編號GE/2017/06 香港特區政府土木工程拓展署

土地勘探 – 市區及周圍島嶼(定期合約)

13665 新界元朗市地段第510號西鐵元朗站物業發展項目 – 地基、鋼管樁及鋼板樁工程 新鴻基地產

13669 九龍何文田常盛街九龍內地段第11257號住宅發展項目 – 平整地盤及地基工程 高銀金融(集團)有限公司

13675 白石角科研路地段214號住宅發展項目 – 地基及閘板樁工程 金門 – 總承建商

13679 大樹灣海洋公園B區富麗敦海洋公園酒店 金門 – 總承建商

地盤平整、地基及上層結構工程主要合約 – 地基工程分判合約

13685 新界將軍澳工業IE2.0發展項目A 香港科技園公司

13692 新界沙田地段第609號多石街住宅發展項目 新鴻基地產

設計及建造地基、挖掘及橫向支撐樁柱工程

46 | The Record • Issue 1/2018

主要工程合約一覽表

編號 項目 客戶

13697 中環美利道2號寫字樓發展項目 – 測量及隧道監控工程 �基兆業地產有限公司

13702 合約編號HY/2014/09 西松建設株式會社 – 總承建商

中九龍幹線 – 何文田豎井通道及地質勘測,包括在護土牆進行水平鑽取土芯、使用儀表及鑽探工程

13705 新界西貢北十四鄉西沙綜合發展計劃 – 擴闊西沙路土地勘測工程 新鴻基地產

13706 中九龍幹線啟德西 – 地基分判工程(路政署合約編號HY/2014/07) 金門 – 總承建商

13709 合約編號 GE/2017/41提供給工務試驗所的土壤及岩石試驗服務 – 新界東 土木工程拓展署

13710 合約編號CC/2017/04/057 – 西九文化區管理局香港故宮文化博物館地基工程 西九文化區管理局

13712 觀塘巧明街98號240號地段商業發展項目 – 設計及建造鋼管樁牆及地基工程 新鴻基地產

13714 合約編號GE/2018/22提供給工務試驗所的土壤及岩石試驗服務 – 市區 土木工程拓展署

13715 九龍啟德第1F區2號地盤新九龍內地段第6556號商業發展項目 – 挖掘及橫向支撐及地基工程 南豐集團

13716 香港堅尼地城吉席街33至47號住宅及商業發展項目 – 地基、樁帽、挖掘及橫向支撐工程 上海商業銀行

13719 將軍澳市地段第39號及增批部分 香港科技園公司

P段第3分段拆卸工程主要合約

13722 合約編號PD/WC/200 – 新界將軍澳工業IE2.0發展項目C 香港科技園公司

先進製造業中心設計及地基建造工程

新加坡

14267 合約編號QX13 -032 – 供應及更換現時地鐵網絡的南北及東西道岔承托/軌枕木 SMRT企業

14268 合約T210 – 設計及建造湯申東海岸線美華地鐵站 新加坡陸路交通管理局

14271 合約T271 – 建造湯申合樂地鐵站 新加坡陸路交通管理局

14278 更換地鐵軌道系統,為東西安裝混凝土軌枕 SMRT企業

14279 合約T273A為萬禮補給站及巴士車廠供應及安裝機械裝備 新加坡陸路交通管理局

14280 合約T275A為萬禮補給站供應及安裝電氣裝備 新加坡陸路交通管理局

14287 設計、供應及安裝南北電纜隧道NS1 三星C&T

14292 Global Switch C7機房設備250kw升級工程 Global Switch

14295 新加坡兀蘭六層高數據中心連地庫的鑽孔樁工程 Global Switch

14297 路軌及汽車工場大樓加建工程 – 供應及機械設施安裝工程 新加坡陸路交通管理局

14298 合約T3152 - 供應、安裝及監控T315合約之儀器 新加坡陸路交通管理局

14299 冷卻水改善工程 – 4號立管置換及過濾系統 Global Switch

14300 兀蘭12道六層高數據中心連地下燃油儲存缸工程 Global Switch

14302 合約編號C170026T00的分判工程 – 裕廊島上建造工作隧道、豎井及輔助工程 - 第二區(駁井及接井) Ed Zublin

及第七區(駁井)進行鑽孔咬合樁

The Record • Issue 1/2018 | 47

MAINLAND CHINAGammon Construction (Shanghai) LimitedRoom Osaka, Level 12 Platinum233 Tai Cang RoadShanghai, 200020People’s Republic of ChinaTel: 86 21 5175 1533Fax: 86 21 5175 1519

Shenzhen8/F, Tower A, Sunhope E Metro7018 Caitian Road, Futian DistrictShenzhen 518035People’s Republic of ChinaTel: 86 755 8869 7878Fax: 86 755 8869 7800

SINGAPOREGammon Pte LimitedCo Reg No: 198001094M29 International Business Park #06-05Acer Building, Tower BSingapore 609923Tel: 65 6722 3600Fax: 65 6722 3601

HONG KONGHeadquartersGammon Construction Limited28/F, Devon HouseTaiKoo Place, 979 King’s RoadHong KongTel: 852 2516 8823Fax: 852 2516 6260

Gammon E&M Limited28/F, Devon HouseTaiKoo Place, 979 King’s RoadHong KongTel: 852 2516 8823Fax: 852 2562 3790

Lambeth Associates Limited28/F, Devon HouseTaiKoo Place, 979 King’s RoadHong KongTel: 852 2516 8823Fax: 852 2516 6352

MACAUGammon Building Construction (Macau) LimitedMacau P.O. Box 6623

VIETNAMGammon Construction Limited5th Floor, 2Bis-4-6 Le Thanh Ton,Ben Nghe Ward, District 1Ho Chi Minh CityVietnam

Jointly owned by Jardines and Balfour Beatty

香港特別行政區

總公司金門建築有限公司

香港英皇道979號太古坊德宏大廈廿八樓電話:852 2516 8823傳真:852 2516 6260

金門機電工程有限公司

香港英皇道979號太古坊德宏大廈廿八樓電話:852 2516 8823傳真:852 2562 3790

琳寶工程顧問有限公司

香港英皇道979號太古坊德宏大廈廿八樓電話:852 2516 8823傳真:852 2516 6352

澳門

金門建築(澳門)有限公司

澳門郵政信箱6623

越南

金門建築有限公司

越南胡志明市 第一郡 濱義坊黎宗聖路 2Bis-4-6 五樓

中國大陸

金門斯堪雅(上海)有限公司

上海市黃浦區太倉路233號新茂大廈12樓Osaka室電話:86 21 5175 1533傳真:86 21 5175 1519

深圳 深圳市福田區彩田路7018號新浩壹都A座8樓郵編:518035 電話:86 755 8869 7878傳真:86 755 8869 7800

新加坡

Gammon Pte LimitedCo Reg No: 198001094M 29 International Business Park #06-05 Acer Building, Tower B Singapore 609923電話:65 6722 3600傳真:65 6722 3601