DRAFT ENVIRONMENTAL MANAGEMENT PLAN 930 MW KIRTHAI – II HYDRO ELECTRIC POWER PROJECT
Submitted By:
EQMS INDIA PVT. LTD. INDIA
304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower,
Community Centre, Karkardooma, Delhi – 110092
Phone: 011-30003200, 30003219; Fax: 011-22374775
Website: www.eqmsindia.com ; E-mail – [email protected]
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 1
Table of Contents
1. CATCHMENT AREA TREATMENT PLAN ............................................................... 6 1.1. Introduction ...................................................................................................... 6 1.2. OBJECTIVES .................................................................................................. 6 1.3. CATCHMENT AREA ....................................................................................... 7 1.4. TOPOGRAPHY ............................................................................................. 11 1.5. SOIL .............................................................................................................. 13 1.6. LANDUSE ..................................................................................................... 16 1.7. SLOPE .......................................................................................................... 20 1.8. METHODOLOGY USED FOR THE STUDY .................................................. 23 1.9. CATCHMENT AREA TREATMENT PLAN ..................................................... 28 1.10. Treatment of Individual Sub-Watershed ......................................................... 31 1.11. Cost Analysis Of Different Works Under Biological Measures ........................ 35 1.12. Cost Analysis of Different Works Under Soil And Water Conservation Measures 42 1.13. INSTITUTIONAL MECHANISM ........................ Error! Bookmark not defined. 1.14. SUMMARY OF COST OF WORKS .................. Error! Bookmark not defined. 1.15. Objectives ...................................................................................................... 50 1.16. Catchment Area ............................................................................................. 50 1.17. Topography ................................................................................................... 50 1.18. Soil ................................................................................................................ 50 1.19. Landuse......................................................................................................... 50 1.20. Slope ............................................................................................................. 50 1.21. Methodology Used for The Study................................................................... 50 1.22. Catchment Area Treatment Plan.................................................................... 50 1.23. Treatment of Individual Sub-Watershed ......................................................... 50 1.24. Cost Analysis Of Different Works Under Biological Measures ........................ 50 1.25. Cost Analysis of Different Works Under Soil And Water Conservation Measures 50 1.26. Treatment of Private Land ............................................................................. 50 1.27. Cost of Other Components of Cat Plan .......................................................... 50 1.28. Institutional Mechanism ................................................................................. 56 1.29. Summary of Cost of Works ............................................................................ 56
2. COMPENSATORY AFFORESTATION SCHEME .................................................. 58 2.1. General.......................................................................................................... 58 2.2. Methodology and Components ...................................................................... 60 2.3. Cost Estimates for Plantation Per Ha Land .................................................... 61 2.4. Payment of Net Present Value Of Land Transferred ...................................... 65 2.5. Cost Estimate of Compensatory Afforestation Works..................................... 65
3. WILDLIFE AND BIODIVERSITY MANAGEMENT PLAN ........................................ 67 3.1. Objective ....................................................................................................... 67 3.2. Kishtwar National Park .................................................................................. 68 3.3. Wildlife Management and Conservation......................................................... 68 3.4. Rural Infrastructure and Community Development ........................................ 71 3.5. Eco-Tourism and Environmental Awareness ................................................. 72 3.6. Capacity Building and Skill-Up Gradation ...................................................... 72 3.7. Research and Monitoring ............................................................................... 72
4. FISHERIES MANAGEMENT PLAN ....................................................................... 74 4.1. Introduction .................................................................................................... 74 4.2. River Chenab Morphology and Habitat Structures ......................................... 74 4.3. Fish Hatchery Development ........................................................................... 76 4.4. Cost Estimate for Hatchery Development ...................................................... 79
5. Resettlement and Rehabilitation Plan .................................................................... 81
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 2
5.1. Introduction .................................................................................................... 81 5.2. Social Impact Assessment Studies ................................................................ 81 5.3. Resettlement & Rehabilitation Principles ....................................................... 83 5.4. Compensation for Land Owners .................................................................... 88 5.5. Elements of Rehabilitation and Resettlement Entitlement for Affected Families89 5.6. Identification of Project Affected Families ...................................................... 98 5.7. Budget for R&R Benefits ................................................................................ 99 5.8. Infrastructure Facility Proposed in Resettlement Area ................................. 102 5.9. Preference of PAF in Terms of Compensation ............................................. 102 5.10. Compensation Disbursement ....................................................................... 102 5.11. Dispute Redressal Mechanism .................................................................... 102 5.12. Appointment of Ombudsman ....................................................................... 103 5.13. Summary of Cost ......................................................................................... 103
6. GREEN BELT DEVELOPMENT PLAN ................................................................ 104 6.1. Introduction .................................................................................................. 104 6.2. Development of Greenbelt ........................................................................... 104 6.3. Guidelines and Techniques For Green Belt Development ........................... 105 6.4. Green Belt Development ............................................................................. 107 6.5. Cost Estimate of Green Belt Development ................................................... 108
7. RESERVOIR RIM TREATMENT PLAN ............................................................... 109 7.1. Introduction .................................................................................................. 109 7.2. Causes of Land Slides / Slope Failures ....................................................... 110 7.3. Treatment Measures for Land Slides ........................................................... 114 7.4. Protection of Houses / Fields ....................................................................... 114 7.5. Treatment at The Mouth Of Streams Joining Reservoir ............................... 118 7.6. Overall Cost of Reservoir Rim Treatment .................................................... 118
8. MUCK MANAGEMENT PLAN .............................................................................. 119 8.1. General........................................................................................................ 119 8.2. Quantity of Muck Generated And Its Consumptive Use ............................... 121 8.3. Description on Muck Disposal Sites ............................................................. 123 8.4. Implementation of Engineering & Biological Measures ................................ 130 8.5. Species for Plantation .................................................................................. 132 8.6. Cost Estimate for Muck Disposal Plan ......................................................... 132 8.7. Cost Model for Plantation ............................................................................ 133
9. RESTORATION PLAN FOR QUARRY SITES ..................................................... 136 9.1. General........................................................................................................ 136 9.2. Details of Quarry Sites ................................................................................. 136 9.3. Environmental Impacts ................................................................................ 141 9.4. Treatment Measures for Restoration ........................................................... 142 9.5. Cost Estimate for Restoration Of Borrow Areas ........................................... 142 9.6. Landscape and Restoration Plan ................................................................. 143
10. DISASTER MANAGEMENT PLAN ...................................................................... 145 10.1. Introduction .................................................................................................. 145 10.2. MODEL FOR DAM BREAK ANALYSIS ....................................................... 145 10.3. METHODOLOGY ........................................................................................ 146 10.4. STATEMENT OF THE PROBLEM ............................................................... 148 10.5. AVAILABILITY OF DATA ............................................................................. 149 10.6. RESULT AND CONCLUSIONS ................................................................... 149 10.7. Disaster Management Plan.......................................................................... 152 10.8. Flood Forecasting ........................................................................................ 159 10.9. Cost Estimate .............................................................................................. 160
11. WATER, AIR AND NOISE MANAGEMENT PLAN ............................................... 162 11.1. Control of Air Pollution ................................................................................. 162 11.2. Impacts on Noise Levels .............................................................................. 164 11.3. Control of Water Pollution During Construction Phase ................................. 166
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 3
11.4. Cost Involved Towards Control of Water, Air & Noise Pollution ................... 166 12. PUBLIC HEALTH DELIVERY PLAN .................................................................... 167
12.1. Introduction .................................................................................................. 167 12.2. Likely Impacts on Human Health Due to The Project ................................... 168 12.3. Proposed Health Management Plan ............................................................ 168 12.4. Cost Estimate for Health Management Plan ................................................ 171
13. LABOUR MANAGEMENT PLAN FOR HEALTH AND SAFETY ........................... 172 13.1. Introduction .................................................................................................. 172 13.2. Legal Framework for Health and Safety Management ................................. 172 13.3. Health and management safety requirement ............................................... 172 13.4. Occupational Health Management Plan ....................................................... 176 13.5. Safe Working Procedure: ............................................................................. 179 13.6. Cost Estimate for Occupational Health and Safety Management During Construction ............................................................................................................ 190
14. SANITATION AND SOLID WASTE MANAGEMENT PLAN ................................. 191 14.1. Introduction .................................................................................................. 191 14.2. Responsibilities of Project Authority ............................................................. 191 14.3. Solid Waste from Labour Colony ................................................................. 194 14.4. Bio-Medical Wastes from Hospitals ............................................................. 195 14.5. Sewage Management in Nearby Villages .................................................... 196 14.6. Cost Estimate for Solid Waste Management ................................................ 196
15. LOCAL AREA DEVELOPMENT PLAN ................................................................ 198 15.1. Introduction .................................................................................................. 198 15.2. Local Area Development Committee ........................................................... 198 15.3. Preparation of Shelf of Schemes ................................................................. 200 15.4. Cost Under Human Resource and Local Area Development Plan ............... 203
16. ENVIRONMENTAL SAFEGUARDS DURING CONSTRUCTION ACTIVITIES INCLUDING ROAD CONSTRUCTION ....................................................................... 204
16.1. Introduction .................................................................................................. 204 16.2. Construction Related Impacts and consequent safeguards ......................... 204 16.3. Road Construction ....................................................................................... 206 16.4. Impacts Due to Construction of Roads ........................................................ 206 16.5. Management Measures ............................................................................... 206 16.6. Budget ......................................................................................................... 208
17. ENERGY CONSERVATION MEASURES ........................................................... 209 17.1. Introduction .................................................................................................. 209 17.2. Alternate to Fuelwood .................................................................................. 209 17.3. Scheme for Substitute Fuel To Labourers .................................................... 209 17.4. Debitable Cost of Providing Fuelwood Substitute ........................................ 210
18. ENVIRONMENTAL MONITORING PLAN ............................................................ 212 18.1. The Need ..................................................................................................... 212 18.2. Areas Of Concern ........................................................................................ 212 18.3. Environmental Monitoring ............................................................................ 212 18.4. Equipment Required for Monitoring ............................................................. 217 18.5. Monitoring of Erosion & Siltation .................................................................. 219 18.6. Environment Monitoring Through Remote Sensing Technology .................. 219 18.7. Ecosystem Studies ...................................................................................... 219 18.8. Monitoring of Muck Disposal. ....................................................................... 220 18.9. Monitoring of Socio-Economic Structure ...................................................... 220 18.10. Sharing of Monitoring Results ...................................................................... 220 18.11. Capacity Building ......................................................................................... 220 18.12. Cost of Environment Monitoring Programme ............................................... 228
19. SUMMARY OF COST .......................................................................................... 231 19.1. Summary of Cost ......................................................................................... 231
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 4
List of Tables
Table 1.1 : Basin Characteristics of Different Sub-watersheds ............................................. 50 Table 1.2 : Land use Details of Sub-watersheds in the Free Draining Catchment ................ 50 Table 1.3 : Slope Ranges showing the intensity of catchment area ...................................... 50 Table 1.4 : Slope Classes for Study Area ............................................................................. 50 Table 1.5 : Delivery Ratio (DR) Criteria Adopted for the Kirthai HEP, Stage-I Study ............ 50 Table 1.6 : SYI and Priority Rating as per Erosion Intensity ................................................. 50 Table 1.7 : Erosion Intensity & Weightages .......................................................................... 50 Table 1.8 : Erosion Intensity Categories in Sub-Watersheds ................................................ 50 Table 1.9 : Per Ha. Cost Norms for Model Plantation Works ................................................ 50 Table 1.10 : Cost Estimate for Afforestation Measures ......................................................... 50 Table 1.11 : Cost Analysis per ha. of Enrichment Plantation ................................................ 50 Table 1.12 : Cost Estimate for Enrichment Plantation .......................................................... 50 Table 1.13 : Cost Analysis per ha. of High Density Energy Plantation .................................. 50 Table 1.14 : Cost Estimate for High Density Energy Plantation ............................................ 50 Table 1.15 : Cost analysis of treatment of alpine pasture ..................................................... 50 Table 1.16 : Cost Estimate for Treatment of Alpine Pastures ............................................... 50 Table 1.17 : Cost Estimates for Implementing Nursery Support ........................................... 50 : Cost Analysis per ha of Bio-Engineering Works ................................................................ 50 Table 1.18 ............................................................................................................................ 50 Table 1.19 : Cost Estimate for Bio-Engineering Works ......................................................... 50 Table 1.20 : Cost Analyses of Structures ............................................................................. 50 Table 1.21 : Abstract of Works under Civil Structures .......................................................... 50 Table 1.22 : Cost of private land treatment ........................................................................... 50 Table 1.23 : Cost Estimate for Support Infrastructure ........................................................... 50 Table 1.24 : The Break-up of Cost under Different Non-conventional and Fuel Saving
Devices for Stake-holders ............................................................................................. 50 Table 1.25 : Cost Estimate of CAT Plan ............................................................................... 50 Table 2.1 : Land Requirement of Submergence and Project Component ............................. 58 Table 2.2 : List of Plant Species Identified for Afforestation .................................................. 58 Table 2.3 : Per Ha Cost Norm for Model Plantation Works ................................................... 58 Table 2.4 : Total Cost of Scheme ......................................................................................... 58 Table 3.1 : Financial Abstract for Activities under the plan ................................................... 73 Table 4.1 : Manpower required for hatchery operation ......................................................... 81 Table 4.2 : Cost Estimate for Setting up of Trout Hatchery ................................................... 81 Table 5.1 : Land Requirement of Submergence and Project Component ........................... 104 Table 5.2 : Financial aids required for 6 week Entrepreneurship training programme for a
group having 20 trainees ............................................................................................. 104 Table 5.3 : Community Development works around Machel & Gulabgarh ......................... 104 Table 5.4 : Development of Educational facilities ............................................................... 104 Table 5.5 : Cost estimates for community development ..................................................... 104 Table 6.1 : Suggested Plant Species for Green Belt Development ..................................... 107 Table 6.2 : Summary of Cost for Green Belt Development ................................................. 108 Table 7.1 : Details of Nadi / Nala into which the Reservoir Extends ................................... 110 Table 7.2 : Details of Proposed Engineering and Biological Control Measures................... 114 Table 7.3 : Village wise length of RCC Wall Protection ...................................................... 114 Table 7.4 : Cost of Protection Walls ................................................................................... 118 Table 7.5 : Cost Estimate of Mouth Treatment of Stream ................................................... 118 Table 7.6 : Total Cost of Reservoir Rim Treatment ............................................................ 118 Table 8.1 : Component Wise Details of the Muck Generated and its Management ............ 120 Table 8.2 : Muck Disposal Site Details ............................................................................... 123 Table 8.3 : Name of the Plant Species ............................................................................... 132 Table 8.4 : Cost Estimate for Muck Disposal Plan indicating Engineering, Biological, Bio-
Technological Measures and Maintenance ................................................................. 132
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 5
Table 8.5 : Cost Model for Plantation on Muck Dumping Sites (For One Hectare Area) ..... 133 Table 9.1 : Quantity of Various Materials............................................................................ 136 Table 9.2 : Cost estimates for restoration of borrow areas ................................................. 142 Table 9.3 : Cost Estimate for Landscaping Plan ................................................................. 144 Table 10.1 : Status of Emergency ...................................................................................... 145 Table 10.2 : Cost Estimate for Implementing DMP ............................................................. 145 Table 11.1 : Emission limits for DG sets prescribed by CPCB ............................................ 162 Table 11.2 : Maximum Exposure Periods specified by OSHA ............................................ 162 Table 11.3 : Schedule of Medical Check-up ....................................................................... 162 Table 11.4 : Cost Estimate ................................................................................................. 162 Table 11.5 : Cost of Mitigative Measures ........................................................................... 162 Table 12.1 : Existing Health Facilities in the Project Affected Area ..................................... 167 Table 12.2 : Summary of Diseases Prevalent in the Study Area ........................................ 167 Table 12.3 : Budget Estimate of Health Management Plan ............................................... 167 Table 14.1 : Solid Waste Generated from Project Colony (kg dry weight) ........................ 191 Table 14.2 : Cost Estimate for Solid Waste Management Plan .......................................... 191 Table 16.1 : Project Roads to the Different Work Sites ....................................................... 204 Table 16.2 Details of expenditure for implementation of measures for management of
Impacts due to construction of roads ........................................................................... 204 Table 17.1 : Cost of providing fuel wood substitute ............................................................ 211 Table 18.1 : National River Water Quality Standards for Different Uses* ........................... 214 Table 18.2 : Water Quality parameters to be monitored periodically ................................... 217 Table 18.3 : List of Equipments .......................................................................................... 218 Table 18.4 : Institutional Strengthening and Training ......................................................... 225 Table 18.5 : Scheduling and Reporting .............................................................................. 227 Table 18.6 : Summary of Environment Monitoring Programme .......................................... 229 Table 19.1 : Summary of Total Cost Estimate .................................................................... 231
List of Figures
Figure 1.1 : Free Draining Catchment of the Study Area ...................................................... 50 Figure 1.2 : Map Showing Location of Sub-watersheds ........................................................ 50 Figure 1.3 : Soil Map of the Free Draining Catchment .......................................................... 50 Figure 1.4 : Landuse Map of Free Draining Catchment Area................................................ 50 Figure 1.5 : Slope Map of Free Draining Catchment ............................................................ 50 Figure 1.6 : Erosion Intensity Map of Free Draining Catchment Area ................................... 50 Figure 4.1 : An example of a fish hatchery layout and grow-out facility in one building ......... 81 Figure 5.1 : Flow Line Diagram of R & R Process .............................................................. 104 Figure 6.1 : Schematic Arrangement of Greenbelt Plantation ............................................. 105 Figure 8.1 : Location of Dumping Site ................................................................................ 122 Figure 9.1 : Location Plan of the Quarry/Mining Sites......................................................... 138 Figure 9.2 : The General View of the Quarry Site Q-1 ........................................................ 139 Figure 9.3 : The General View of the Quarry Site Q-2 ........................................................ 140 Figure 9.4 : The General View of the Quarry Site Q-2 ........................................................ 140 Figure 9.5 : The General View of the Quarry Site Q-3 ........................................................ 141 Figure 10.1 : Flow Chart of Responsibilities ....................................................................... 145
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 6
1. CATCHMENT AREA TREATMENT PLAN
1.1. Introduction
The study of erosion and sediment yield from catchment is of utmost importance as
the deposition of sediment in reservoir reduces its capacity, thus affecting the water
available for the designated use. The eroded sediment from catchment when
deposited on streambeds and banks causes braiding of river reach. The removal of
top fertile soil from catchment also adversely affects the agricultural production.
Another important factor that adds to the sediment load and which contributes to soil
degradation is grazing pressure. A large number of cattle, sheep, and goats graze
the pastures continuously for about six months in a mountainous region.
The lack of proper vegetal cover is a factor to cause degradation and there by results
in severe run off/soil erosion, and subsequently premature siltation of the reservoir.
Thus, a well-designed Catchment Area Treatment (CAT) Plan is essential to
ameliorate the above-mentioned adverse cause and process of soil erosion. The
catchment area treatment involves the understanding of the erosion characteristics of
the terrain and suggesting remedial measures to reduce the erosion rate. For this
reason, the catchment of the directly draining rivers, streams, tributaries, etc. are
treated and the cost is included in the project cost.
The 1457 sqkm area catchment of “Kirthai HEP, Stage-II” consists of three
watersheds. The pre-requisite for a watershed management is the collection of
multipronged data e.g., geology, geomorphology, topography, soil, landuse/
landcover, climate, hydrology, drainage pattern, etc. The multi-pronged data
generated from various published sources and actual data collected from these
watersheds on the above-mentioned parameters forms the basis of the Action Plan
for Catchment Area Treatment is presented here.
Catchment Area Treatment (CAT) plans for the free draining catchment area of the
proposed ‘Kirthai HEP, Stage-II’ has been prepared for areas with high soil erosion
intensity. The CAT Plan targets towards overall improvement in the environmental
conditions of the region. All the activities are aimed at treating the degraded and
potential areas with severe soil erosion. The plan provides benefits due to biological
and engineering measures and its utility in maintaining the ecosystem health. The
plan with objectives addresses issues such as prevention of gully erosion, enhancing
the forest cover for increasing soil holding capacity; and arresting total sediment flow
in the reservoir and flowing waters.
1.2. Objectives
Integrated watershed management plan minimizes the sedimentation of reservoir.
The main aim of the Catchment Area Treatment Plan is to rejuvenate various
potential and degraded ecosystems in the catchment area for longevity of the
reservoir storage capacity. For this purpose, the action plan has been prepared with
the following objectives:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 7
1. To facilitate the hydrological functioning of the catchment and to augment the quality of water of the river and its tributaries.
2. Conservation of soil cover and to arrest the soil erosion, floods and siltation of the river along with its tributaries and consequent reduction of siltation in the reservoir of the project.
3. Demarcation of the priority of watersheds for treatment on the basis of soil erosion intensity in the catchment area.
4. Rehabilitation of degraded forest areas through afforestation and facilitating natural regeneration of plants.
5. Mitigation of landslide, landslip and rock falls.
6. Soil conservation through biological and engineering measures to reduce sediment load in river and tributaries, incidentally improving the quality of water.
7. Ecosystem conservation resulting from increased vegetal cover and water retaining properties of soil.
8. To meet the fuel and fodder requirements of local people.
9. Promotion of non-conventional energy device to reduce pressure on forest.
10. Employment generation through community participation and conservation.
1.3. Catchment Area
The Chenab emanates from Baralacha pass in the Lahul and Spiti part of the Zaskar
Range in Himachal Pradesh. Two small streams viz. the Chandra and the Bhaga
rising from the south-west and north-west faces of the pass respectively, from its
headwaters at about El 4890 masl. The Chandra, that flow south-east for initial 88
km, after traversing 125 km confluence with the other limb, the Bhaga, at Tandi. The
latter negotiates a total river course of 80 km with an average fall of about 24 m/km.
The united stream, called the Chandrabhaga or Gador, flowing northwesterly for 46
km is joined on its right bank by the Miyar Nala. The Chandrabhaga, after flowing in
general northwest direction almost parallel to the Pir Panjal range, crosses at El.
1838 masl the Pangi valley of Himachal Pradesh to enter Paddar block of newly
formed district Kishtwar of Jammu and Kashmir.
After entering the J & K, the Chadrabhaga continues to flow northwest for 56 km and
receive at Bhandalkot on its right bank, the Marusudar, one of its biggest tributary. In
this section, it also meets Bhut Nala on its right bank. Near Kishtwar, it cuts a deep
gorge, sometime 1000m deep. Flowing further downstream south wards for 34 km
upto Thathri and is joined by Niru Nala on its left flank. Thereafter flowing generally in
northwest direction for another 41 km it receives Bichleri, a right bank tributary, and
continues to flow westwards for about 50 km reach where it is joined by small
streams viz. Cheneni, Talsuen, Yabu and Ans on the right bank besides Katu Nala,
Mandial and Painthal Khad on the left bank. After the confluence with river Ans, the
Chenab changes its course to southerly direction for about 45 km and debouches
into plains near Akhnoor in Jammu and Kashmir. Thereafter it swings to the South-
West through the plains of Pakistan Punjab for a distance of 644 km to reach
Panchand where it joins the Satluj after receiving waters of the Jhelum and the Ravi.
The total length of the river from the confluence with the Chandra and Bhaga upto
Akhnoor is about 410 km whereas the total length upto the point of confluence with
the Satluj is 1108 km. the catchment area of the Chenab basin upto international
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 8
border with Pakistan is 29050 Sqkm out of which 6242 Sqkm area is under perpetual
snow.
1.3.1. Free Draining Catchment
The total catchment area of the Chenab upto the proposed Kirthai HEP, Stage-II is
9986.9 sqkm out of which the catchment area upto the next upstream project viz.
Kirthai HEP, Stage-I, is 8530 sqkm. Thus, the free draining catchment of the Chenab
extended to the next upstream proposed development is 1456.90 Sqkm. which is
largely contributed by Bhut Nadi, a right bank tributary of the Chenab which
confluences with the latter at Gulabgarh at El 1779 masl. The altitude in the free
draining catchment area varies from El 1620 masl, at dam site, to El 6722 masl. The
area above El …. masl which is predominantly covered under snow is approximately
…. Km. The average river bed slope in between the two stages of development is 10
m/km being gentle up to Kirthai and steeper thereafter.
As per nomenclature contained in Water Atlas of India, Edition 1993, the free
draining catchment under the study area lies in Water Resource Region-I (Indus);
basin 1D (Chenab), Catchment 1D! (Whole Chenab), sub-catchment 1D1D (Middle
Chenab from Marau confluence to Bhaga) and covered in parts under watershed
1D1D1 (left bank Chenab), 1D1D2 (Bhut nala) and 1D1D3 (Dharlang). The free
draining catchment has been further sub-divided into nine sub-watersheds. The basin
characteristics of different sub-watersheds are illustrated in Table 1.1 and the
satellite imagery of the free draining catchment is presented in Figure 1.1 and the
sub-watershed location is shown in Figure 1.2.
Table 1.1 : Basin Characteristics of Different Sub-watersheds
Sl.
No.
Name of
Watershed
Name of
Sub-
watershed
Sub-
watershed
Code
Area (ha) El of the
highest point in
sub-watershed
(m. above masl)
1. Left bank
Chenab
Kirthai IDIDI (1) 9105.90 5029
Total Watershed 9105.90
2. Bhut Nadi Ligri IDID2 (1) 6378.02 4711
Pilali IDID2 (2) 11457.83 6230
Machel IDID2 (3) 5099.53 6135
Gulabgarh IDID2 (4) 7238.01 6062
Total Watershed 30173.39
3. Dharlang Dharlang
Nala
IDID3 (1) 43763.50 6486.00
Bhuzas Nala IDID3 (2) 26840.23 6722.00
Bharaj Nala IDID3 (3) 12116.11 6240.00
Bhazun Nala IDID3 (4) 23702.87 5765.00
Total Watershed 106422.71
Grand Total 145702.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 9
Figure 1.1 : Free Draining Catchment of the Study Area
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 10
Figure 1.2 : Map Showing Location of Sub-watersheds
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 11
1.4. Topography
The free draining catchment area lies in grater and less Himalayas Himalayas. At the
project site, the river flows in a very deep gorge having mean elevation of 1650 masl.
The river bed at dam site is about 85 m wide and the abutments are steep sloping on
the left bank at angles of about 600 to 650 and on the right bank slope is 400 upto the
proposed dam top. The elevation of the study area varies from El. 1650 masl at dam
site to El. 6722 masl in the free draining catchment area covered under SWS, Bhujas
nadi. On the left bank of the Chenab River from Kirthai upto Gulabgarh very fertile
agriculture terraces exists in the Paddar valley. Fertile terraced fields in small chunks
have also been observed on both banks of Bhutnala upto Machel. The topography
map of the free draining catchment is shown in Figure 1.3.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 12
Figure 1.3 : Topographical Map of Free Draining Catchment Area
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 13
1.5. Soil
The soil resource map of J & K (NBSS Publication No 62) has been used in the
present study. The soil is predominantly fine to coarse loamy soil. The soil map
presented in Figure 1.4 reveals that the soil of the area belongs to those of great
Himalayas and lesser Himalayas having map units, 108, 107, 89, 90, 53, 52, 27, 36,
20, 21 and 22 being soil of side and reposed slopes and also lesser Himalayas in soil
of map units 53. The characteristics of these soils are described hear under:
Soils on fluvial valley Soil belonging to map unit 108 are soils on fluvial valley of Chenab river in project
area. These soils are deep somewhat excessively drained, fine loamy, calcareous
soil on moderate slopes with loamy surface, moderate erosion and slide stoniness
associated with coarse loamy surface moderate erosion and moderate stoniness.
Soil belonging to map unit 107 are soils on side / reposed slopes on right side of the
Bhutnala and right bank of Chenab River. These soils are medium deep well drained
fine loamy soils on gentle slopes with loamy surface and slight erosion; associated
with deep well drained fine loamy calcareous soil with loamy surface and slide to
moderate erosion.
Soil belonging to map unit 90 are soils on side / reposed slopes on left bank of
Chenab d/s of dam to power house site and further below. These soils are medium
deep excessively drained coarse loamy soil on steep slopes, severe erosion and
moderate stoniness; associated with deep well drained fine loamy soils with
moderate erosion.
Soil belonging to map unit 89 are soils on left bank of Chenab covering area of
Kirthai to Arthal u/s of dam. These soils are soils on side / reposed slope and are
shallow excessively drained, loamy soils on steep slopes, severe erosion and
moderate stoniness; associated with medium deep, excessively drained fine loamy
soils with severe erosion.
Soil belonging to map unit 86 are soils on left bank of Chenab covering area of the
upper portion of sub-watershed Kirthai. These are basically rock outcrops associated
with shallows, excessively drained, loamy soils on moderately step slopes with loamy
surface, moderate erosion and moderate stoniness.
Soil belonging to map unit 85 are soils on left bank of Chenab covering area of the
uppermost portion of sub-watershed Kirthai. These soils belong to thermic
temperature regime. These are deep, well drained, thermic, fine loamy, soils on
moderate slope with loamy surface, moderate erosion and slight stoniness
associated with fine loamy, moderate erosion and moderate stoniness.
Soils on Lower Predmont Plains Soil belonging to map unit 82 are soils on left bank of Chenab situated above the
extremity of soils of map units 89 and 90. These soils are deep, imperfectly drained,
fine silty soils on very gentle slopes with loamy surface, slight erosion and
moderately deep ground water.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 14
Soils on Glacio-fluvial Valleys and Morain Soils belonging to map unit 53 covers larger portion of Bhut Nala on either side.
These soils are deep, somewhat excessively drained, coarse loamy soil on moderate
slopes with loamy surface, moderate erosion and moderate stoniness associated
with well drained coarse loamy soils with moderate erosion.
Soils belonging to map unit 52 cover left bank of Bhut Nala from Machel. These soils
are deep, somewhat excessively drained, coarse loamy soil on gentle slopes with
loamy surface, moderate erosion and moderate stoniness associated with well
drained coarse loamy soils with moderate erosion.
Soils belonging to map unit 36 cover left bank of Bhut Nala from confluence with
Chenab to Machel and cover area above the mapping unit 53. These are soil on side
/ reposed slopes and are mainly rock out crops associated with deep excessively
drained, sandy skeletal soils on steep slopes with sandy surface with very severe
erosion and moderate stoniness.
Soils belonging to map unit 27 are soils on side / reposed slopes and are mainly rock
out crops associated with deep, excessively drained, mesic, loamy skeletal soils on
steep slopes with loamy surface with severe erosion and strong stoniness.
Soils belonging to map unit 22 are soils on side/reposed slopes and are mainly rock
out crops associated with medium deep, excessively drained, loamy skeletal soils on
very steep slopes with loamy surface with severe erosion and strong stoniness.
Soils belonging to map unit 21 are soils on side/reposed slopes and are dominantly
rocky landscape associated with very shallow, excessively drained, fragmented soils
on very steep slopes with loamy surface, very severe erosion and strong stoniness.
Soils on Mountain and Valley Glacier Soil belonging to map unit 20 pertains to dominantly glaciers and rock out crops
associated with medium deep, excessively drained, sandy skeletal, soils on very
steep slopes with sandy surface and moderate stoniness.
Soil belonging to map unit 19 pertains to dominantly glaciers and rock out crops
associated with shallow, excessively drained, sandy skeletal, soils on very steep
slopes with severely eroded sandy surface and moderate stoniness.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 15
Figure 1.4 : Soil Map of the Free Draining Catchment
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 16
1.6. Landuse
1.6.1. Land use-Land Cover Classification
Based on satellite data and toposheets, a land-use map has been prepared and will
be verified in detail during ground surveys i.e. cross checked with ground truths. The
Land use/ Land-cover map of the free draining catchment area is presented in
Figure 1.5 and its details in each sub-watershed under free draining catchment area
are presented in Table 1.2.
1.6.2. Land use Categories and Erosion
The erosion acts differently in different land-use types. It is important to understand
the nature of erosion in a particular land-use class to further plan for treatment.
1.6.2.1 Agricultural Land
Around 9873.45 ha area of the free-draining catchment constituting 6.78% of the total
free drainage catchment comes under this category. Well-planned and developed
terraces were seen at some places. Almost 50% of the terraces are properly
stabilized by using the stones which itself will manage to reduce the erosion. In
general, at places the sheet and rill type of soil erosion predominates with few gullies
in early stage of its development. Very few or no measures are taken to conserve soil
and tendency exists to interrupt the natural drainage due to faulty agricultural
practices. Runoff often exceeds the safe velocity on long slope lengths. It is
suggested to repair and better design the agricultural terraces, which follows the
faulty agricultural practices.
Temporary and semi-permanent soil conservation structures like brushing dams,
wiring woven and gabion check dams etc. be made for effective adaptive
management.
1.6.2.2 Glacial Deposits / Morains
Under the category about 18654.82 ha area constituting 12.80% of the free draining
catchment is present. This category denotes glaciated low lying areas surrounded by
high snow peaks. Morains deposits and scree material often under snow exists in this
zone. Waste land is characterized by highly degraded land surface and rock
outcrops. No vegetation cover exists. Due to high altitude, no plantation of any kind
of tree species is possible in this land use class.
1.6.2.3 Degraded Forest
Around 5834.98 ha area constituting 4.0% of the free draining catchment area is
classified under this land-use category. These areas are characterized by highly
degraded land surface. Very little and only seasonal vegetation cover exists. Huge
gullies, frequent land slips and high to extremely high erosion rates are other
prominent features. Stream bank protection works followed by well planned
afforestation are suggested for such land-use category. Silvi-pasture plantation and
natural regeneration can also be done.
1.6.2.4 Snow/Glacier
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 17
About 14239.94 ha area constituting about 6.37% of the free draining catchment is
present. The area cannot be given any type of treatment and, therefore, has been
excluded in computation of SYI values.
1.6.2.5 Open Forest Land
Under open forest category about 16088.8 ha, constituting 11.04% of the free
draining, is present catchment. Forest crown density ranges from 0-40% or on
average 20% crown density can be assumed to be present in the area. Soils have
relatively good water holding capacity, humus, nutrient content and moderate to
slight erosion rates on steeper slopes. Therefore, rill erosion predominates which in
due course leads to scrub land formation with gullies. Afforestation is suggested so
as increase the crown density by 20% in whole of the area to reduce erosion.
1.6.2.6 Dense Forest
Dense forest covers about 17981.45 ha area constituting 12.34% of the free draining
catchment with the forest crown density above 40%. Soils are very good in water
holding capacity, humus and nutrients with no erosion but due to steeper slopes
some area requires soil conservation measures.
1.6.2.7 Alpine Vegetation / Barren
Around 18587.19 ha area constituting 12.76% of the area draining catchment area is
classified under Alpine vegetation cover. Area at higher level should be left for
natural regeneration and the pasture development can be taken at lower levels.
1.6.2.8 Snow / River / Water body
Around 30353.91 ha area constituting 20.83% of the free draining catchment area is
classified under water bodies. The category needs no treatment except that the
unstable bank shall be provided stream bank stabilization through protection
measures whenever required.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 18
Table 1.2 : Land use Details of Sub-watersheds in the Free Draining Catchment
S.
No.
SWS
Code
Area (ha) Under Different Land Use Class
Dense
Forest
Open
Forest
Degraded
Forest
Scrub
Agriculture
&
Settlement
Glacial
deposits /
Morains
Alpine
Vegetation
/Barren
Glacial
Melts /
Water
body
Snow /
water
body
Area (ha) Percentage
of Total (%)
1 IDIDI(1) 2488.09 1974.34 799.50 650.00 1122.02 615.12 1050.40 406.43 9105.90 6.25
2 IDID2(1) 1181.68 1549.84 1092.58 1273.77 638.25 479.19 155.85 6.86 6378.02 4.38
3 IDID2(2) 758.38 1493.69 1273.88 1727.25 1109.68 1896.06 1722.62 1476.27 11457.83 7.86
4 IDID2(3) 2320.02 1096.60 69.85 265.63 275.96 236.45 476.51 358.51 5099.53 3.50
5 IDID2(4) 3089.97 1788.78 136.60 611.46 548.31 506.52 393.62 162.75 7238.01 4.97
6 IDID3(1) 3770.97 4019.90 599.57 1467.93 6986.37 6276.73 9466.05 11175.98 43763.50 30.04
7 IDID3(2) 2484.85 1695.30 645.01 1378.03 3159.30 3531.51 5879.82 8066.41 26840.23 18.42
8 IDID3(3) 925.13 816.86 465.72 1058.71 1586.31 2115.45 2221.87 2926.06 12116.11 8.32
9 IDID3(4) 962.36 1653.48 752.27 1440.67 3228.62 2930.16 6960.67 5774.64 23702.87 16.26
Total 17981.45 16088.8 5834.98 9873.45 18654.82 18587.19 28327.41 30353.91 145702
% of Total 12.34 11.04 4.00 6.78 12.80 12.76 19.44 20.84 100
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 19
Figure 1.5 : Landuse Map of Free Draining Catchment Area
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 20
1.7. Slope
The slope of a watershed plays an important role in controlling the soil and water
retention thereby affecting the land-use capability. The percentage of the slope in a
watershed determines the soil erosion susceptibility and forms the basis for
classifying different of the watershed into suitable classes for formulating effective
soil erosion conservation measures. Broadly, the following slope classes and ranges
(Table 1.3.) as per norms of All India Soil & Land Use Survey were adopted to
classify the slopes for the present study.
Table 1.3 : Slope Ranges showing the intensity of catchment area
Sr. No Slope Range (Degrees) Description
1. 0-20 Very Gentle Slope
2. 20-35 Gentle Slope
3. 35-45 Moderate Slope
4. 45-60 Steep Slope
5. 60-75 Very Steep Slope
6. Above 75 Extremely Steep Slope
The Slope map of the free draining catchment is presented in Figure 1.6 and slope
details are as presented under Table 1.4. The data shows that about 79.85% area
lies between very gentle to moderate category of slope and balance 20.15% falls
from steep to extremely steep slope category.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 21
Figure 1.6 : Slope Map of Free Draining Catchment
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 22
Table 1.4 : Slope Categories in Respective Sub-Watersheds / Micro-Watersheds of the Catchment area of Kirthai HEP, Stage-II
S.
No.
SWS
Code
Slope Total
Area % 00 - 200 200 - 350 350 - 450 450 - 600 600 - 750 >750
Area % Area % Area % Area % Area % Area %
1 IDIDI(1) 1850.96 20.33 5099.65 56.00 1509.98 16.58 418.46 4.60 220.15 2.42 6.70 0.07 9105.90
2 IDID2(1) 783.14 12.28 3094.22 48.51 1295.71 20.32 721.80 11.32 462.99 7.26 20.16 0.32 6378.02
3 IDID2(2) 1748.42 15.26 4386.25 38.28 2237.66 19.53 1735.17 15.14 1337.72 11.68 12.61 0.11 11457.83
4 IDID2(3) 481.06 9.43 1639.38 32.15 1567.12 30.73 1002.45 19.66 398.29 7.81 11.23 0.22 5099.53
5 IDID2(4) 944.97 13.06 3267.21 45.14 1789.79 24.73 719.28 9.94 501.65 6.93 15.11 0.21 7238.01
6 IDID3(1) 10737.57 24.54 14861.64 33.96 10150.56 23.19 6167.64 14.09 1826.76 4.17 19.33 0.04 43763.50
7 IDID3(2) 6341.33 23.63 7733.39 28.81 4997.97 18.62 4531.62 16.88 3193.06 11.90 42.86 0.16 26840.23
8 IDID3(3) 3835.86 31.66 4173.81 34.45 1835.17 15.15 1277.22 10.54 971.36 8.02 22.69 0.19 12116.11
9 IDID3(4) 7049.09 29.74 8908.94 37.59 4016.53 16.95 2189.76 9.24 1528.47 6.45 10.08 0.04 23702.87
Total 33772.40 23.18 53164.49 36.49 29400.49 20.18 18763.40 12.88 10440.45 7.16 160.77 0.11 145702.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 23
1.8. Methodology Used for The Study
Superimposing topography, slope, soil and land use data/maps, a tentative
estimation of erosion prone areas and landslides area in the catchment were been
made. The vulnerable and problematic areas were identified in different
physiographic zones.
These data sets were used for preparation of the thematic maps, calculation of
sediment yield index and Erosion Intensity Units.
24.1.1 Soil Loss Using Silt Yield Index (SYI) Method
The Silt Yield Index Model (SYI), considering sedimentation as product of
erosivity, erodibility and aerial extent was conceptualized in the All India Soil and
Land Use Survey (AISLUS) as early as 1969 and has been in operational use
since then to meet the requirements of prioritization of smaller hydrologic units
within river valley project catchment areas.
Methodology for the calculation of sediment yield index developed by All India
Soil & Land Use Survey (Development of Agriculture, Govt. of India) was followed
in this study.
(i) Erosion Intensity and Delivery Ratio
Determination of erosion intensity unit is primarily based upon the integrated
information on soil characters, physiography, slope, land-use/land-cover, litho
logy and structure. This is achieved through super-imposition of different thematic
map overlays. Based upon the field data collected during the field survey and
published data, weightage value and delivery ration were assigned to each
erosion intensity unit. The composite map for delineating different erosion
intensity units was prepared through superimposition of the maps showing soil
types, slope and land-use/land-cover. This thematic mapping of erosion intensity
for entire catchment was done using the overlay and union techniques. Based on
ground truth verification conducted during fieldwork and published data,
weightage and delivery ratio was assigned to each erosion intensity units. The
composite erosion intensity map was then superimposed on the drainage map
with sub-watershed boundaries to evolve CEIU for individual sub-watershed.
Each element of erosion intensity unit is assigned a weightage value. The
cumulative weightage values of the erosion intensity units represent
approximately the relative comparative erosion intensity within the watersheds. A
basic factor of K=10 was used in determining the cumulative weightage values.
The value of 10 indicated an equilibrium condition between erosion and
deposition. Any value of K (10+X) is suggestive of erosion intensity in an
ascending order whereas the value of K (10-X) is suggestive of deposition
intensity in descending order.
The delivery ratios were calculated for each composite erosion intensity unit. The
delivery ration suggests the percentage of eroded material that finally finds entry
into the reservoir or river/stream. Total area of different erosion intensity classes
(composite erosion intensity unit) in each watershed was then calculated.
The delivery ratio is generally governed by the type of material, soil erosion, relief
length ratio, cover conditions, distance from the nearest stream, etc. However, in
the present study the delivery rations to the erosion intensity units were assigned
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 24
upon their distance from the nearest stream (being the most important factor
responsible for delivery of the sediments) according to the following scheme. The
delivery ratio criteria adopted for the study is presented in Table 1.5.
Table 1.5 : Delivery Ratio (DR) Criteria Adopted for the Kirthai HEP, Stage-II Study
Nearest Stream Delivery Ratio (DR)
0-0.9 km 1.00
1.0-2.0 km 0.90
2.1-5.0 km 0.80
5.1-15.0 km 0.70
15.1-30.0 km 0.50
(ii) Sediment Yield Index & Prioritization of Sub-Watersheds
The erosivity determinates are the climatic factors and soil and land attributes
that have direct or reciprocal bearing on the units of the detached soil material.
The relationship can be expressed as:
Soil erosivity = f (Climate, physiography, slope, soil parameters land
use/land cover, soil management)
The Silt Yield Index (SYI) is defined as the Yield per unit area and SYI value for hydrologic unit is obtained by taking the weightage arithmetic mean of the products of the weightage value and delivery ratio over the entire area of the hydrologic unit by using suitable empirical equation.
Prioritization of smaller hydrological units within the vast catchments is based on the SYI of the smaller units. The boundary values of range of SYI values for different priority categories are arrived at by studying the frequency distribution of SYI values and locating the suitable breaking point. The watersheds/sub-watersheds is subsequently rated into various categories corresponding to their respective SYI values.
The application of SYI model for prioritization of sub-watersheds in the catchment areas involves the evaluation of: o Climatic factors comprising total precipitation, its frequency and intensity o Geomorphic factors comprising land forms, physiography, slope and drainage
characteristics o Surface cover factors governing the flow hydraulics o Management factors.
The data on climatic factors can be obtained for different locations in the catchment area from the meteorological stations whereas the field investigations are required for estimating the other attributes.
The various steps involved in the application of model are: o Preparation of a framework of sub-watershed through systematic delineation
o Rapid reconnaissance surveys on 1:50,000 scale leading to the generation of a map indicating erosion-intensity mapping units.
o Assignment of weightage values to various mapping units based on relative silt-yield potential.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 25
o Computing Silt Yield Index for individual watersheds/sub watersheds.
o Grading of watersheds/sub-watersheds into very high, high medium, low and very low priority categories.
The area of each of the mapping units is computed and silt yield indices of individual sub-watersheds are calculated using the following equations:
Silt Yield Index
SYI = (Ai x Wi x Di) x 100/Aw; where I = 1 to n
Where
Ai = Area of ith (EIMU)
Wi = Weightage value of ith mapping unit
Di = Delivery ratio
n = No. of mapping units
Aw = Total area of sub-watershed
The SYI values for classification of various categories of erosion intensity rates were
taken for the present study as:
Priority Category SYI Values
1. Very High >1300
2. High 1200-1299
3. Medium 1100-1199
4. Low 1000-1099
5. Very low <1000
Accordingly, after excluding the area under permanent snow/glaciers from the total
geographical area of sub-watershed, the sediment Yield Index shall be calculated for
09 sub-watersheds. The computation of SYI for each MWS is presented in Table 1.6.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 26
Table 1.6 : SYI and Priority Rating as per Erosion Intensity
SWS Code Erosion
Intensity Class Area, ha Weightage
Weightage x
Area DR
Grass Silt
(EXF) SYI Priority
A B C D E F G H I
IDIDI(1)
Slight 887.91 11 9767.01 1.0 9767.01
Moderate 2893.14 13 37610.82 1.0 37610.82
Servere 1718.56 18 30934.08 0.9 27840.67 1381 Very high
Very Severe 177.78 20 3555.60 0.9 3200.04
Total 5677.39 78418.54
IDID2(1)
Slight 1634.11 11 17975.21 1.0 17975.21
Moderate 1537.59 13 19988.67 0.9 17989.80
Servere 1492.63 18 26867.34 0.9 24180.61 1300 Very high
Very Severe 93.23 20 1864.60 0.9 1678.14
Total 4757.56 61823.76
IDID2(2)
Slight 2044.24 11 22486.64 1.0 22486.64
Moderate 1135.83 13 14765.79 0.9 13289.21
Servere 1365.86 18 24585.48 0.9 22126.93
Very Severe 66.32 20 0.9 1193.76 1281 High
Total 4612.25 59096.54
IDID2(3)
Slight 974.64 11 10721.04 1.0 10721.04
Moderate 1119.99 13 14559.87 1.0 14559.87
Servere 1201.63 18 21629.34 0.9 19466.41 1374 Very high
Very Severe 127.28 20 2545.60 0.9 2291.04
Total 3423.54 47038.36
IDID2(4)
Slight 1050.20 11 11552.20 1.0 11552.20
Moderate 2505.51 13 32571.63 0.9 29314.47 Very high
Servere 1556.42 18 28015.56 0.9 25214.00 1306
Very Severe 138.35 20 2767.00 0.9 2490.30
Total 5250.48 68570.97
IDID3(1)
Slight 4617.93 11 50797.23 0.9 45717.51
Moderate 3436.09 13 44669.17 0.9 40202.25
Servere 3405.49 18 61298.82 0.8 49039.06 1196 Medium
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 27
SWS Code Erosion
Intensity Class Area, ha Weightage
Weightage x
Area DR
Grass Silt
(EXF) SYI Priority
A B C D E F G H I
Very Severe 505.93 20 10118.60 0.8 8094.88
Total 11965.44 143053.70
IDID3(2)
Slight 2535.46 11 27890.06 0.9 25101.05
Moderate 1726.77 13 22448.01 0.8 17958.41
Servere 1924.82 18 34646.76 0.8 27717.41 1168 Medium
Very Severe 337.43 20 6748.60 0.8 5398.88
Total 6524.48 76175.75
IDID3(3)
Slight 1353.84 11 14892.24 0.9 13403.02
Moderate 647.30 13 8414.90 0.9 7573.41
Servere 748.33 18 13469.94 0.8 10775.95 1170 Medium
Very Severe 98.24 20 1964.80 0.8 1571.84
Total 2847.71 33324.22
IDID3(4)
Slight 1801.84 11 19820.24 1.0 19820.24
Moderate 1092.74 13 14205.62 0.9 12785.06
Servere 1325.41 18 23857.38 0.9 21471.64 1289 High
Very Severe 106.87 20 2137.40 0.8 1709.92
Total 4326.86 55786.86
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 28
1.9. Catchment Area Treatment Plan
It is known that there are mainly five categories of Land uses for which a proper
treatment plan should be developed. First is the Agricultural Land as this activity can
never be eliminated, because the faulty practice results in heavy loss of fertile soil.
Second, being open forest land for obvious conservation reasons. Third is scrub or
degraded land, which contributes heavily to the silt load and possibilities exist to
bring this area under pastures and other plantation to meet the local demand of fuel
and fodder and thus decreasing the biotic pressure on the forests and leading to
environment friendly approach of sustainable development. The fourth and most
important category is Barren land because with practically no vegetal cover, the area
produces huge amount of silt load. The fifth is dense forest land where in at few
places soil conservation measures are required. For treatment of catchment area, the
areas that require treatment have been delineated from the Composite Erosion
Intensity Unit Map. The sum of weightages was reclassified as per the Table 1.7
below to further subdivide the area as per the erosion intensity classes. The
weightages for Land use, Slope & Soil were summed to get the Erosion Intensity
Classes.
Table 1.7 : Erosion Intensity & Weightages
Erosion Intensity Class Sum of weightages
Very severe (E5) 12 to 14
Severe (E3) 9 to 11
Moderate (E3) 6 to 8
Low (E2) 4 to 5
Negligible (E1) 0 to 3
After exclusion of rocks and inaccessible terrain, only those areas which fall under
very severe and severe erosion intensity category would be taken up for
conservation treatment measures in very high priority category micro-watersheds,
whereas in the rest of micro-watersheds belonging to other priority categories, the
area falling under very severe erosion intensity class shall be taken for treatment with
biological and engineering measures under the CAT Plan.
Considering the topographic factors, soil type, climate, land-use/land-cover in the
catchment area following engineering and biological measures have been proposed
to be undertaken with the aim to check the soil erosion, prevent/check siltation of
reservoir and to maintain its storage capacity in the long run.
The Erosion Intensity Map of the free draining catchment has been generated on the
basis of SYI data and is presented in Figure 1.7 and the statistics are presented in
Table 1.8.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 29
Table 1.8 : Erosion Intensity Categories in Sub-Watersheds
S. No. SWS Code Area (ha) under different erosion intensity class
Snow/Glacier (ha) Total Area (ha) Slight Moderate Severe Very Severe
1 IDIDI(1) 887.91 2893.14 1718.56 177.78 3428.51 9105.90
2 IDID2(1) 1634.11 1537.59 1492.63 93.23 1620.46 6378.02
3 IDID2(2) 2044.24 1135.83 1365.86 66.32 6845.58 11457.83
4 IDID2(3) 974.64 1119.99 1201.63 127.28 1675.99 5099.53
5 IDID2(4) 1050.20 2505.51 1556.42 138.35 1987.53 7238.01
6 IDID3(1) 4617.93 3436.09 3405.49 505.93 31798.06 43763.50
7 IDID3(2) 2535.46 1726.77 1924.82 337.43 20315.75 26840.23
8 IDID3(3) 1353.84 647.30 748.33 98.24 9268.40 12116.11
9 IDID3(4) 1801.84 1092.74 1325.41 106.87 19376.01 23702.87
Total 16900.17 16094.96 14739.15 1651.43 96316.29 145702.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 30
Figure 1.7 : Erosion Intensity Map of Free Draining Catchment Area
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 31
1.10. Treatment of Individual Sub-Watershed
There are mainly five categories of land uses for which a proper treatment plan
should be developed. First is the agricultural land as this activity can never be
eliminated. And, agriculture activities, if faulty, result in heavy loss of fertile soil.
Second, is open forest land for conservation reasons Third is scrub or degraded land,
which contributes heavily to silt load. Possibilities exist to bring this area under
pastures and plantation to meet local demand of fuel and fodder and thus decreasing
the biotic pressure on the forests leading to environment friendly approach of
sustainable development. The fourth and most important category is barren land
because with practically no vegetal cover the area produces huge amount of silt load.
The fifth is dense forest land where a few places soil conservation measures are
required.
Areas falling under very severe and severe erosion intensity category would be taken
up for conservation treatment measures after excluding the percentage of area
above 500 slope from the area coming under very severe and severe erosion
intensity class falling under rocks and inaccessible terrain where no treatment is
feasible, the rest of area of very severe and severe categories is to be treated with
biological, bio-engineering and engineering measures under CAT Plan. In the
present case, an area of 4550 ha has been proposed to be treated under the CAT
plan. This area includes 4300 ha area of free draining catchment which shall be
treated by biological / engineering measures and 250 ha area under private land
treatment within the free draining catchment.
Considering the topographic factors, soil type, climate, land-use/land-cover in the
catchment area following measures have been proposed to be undertaken with aim
to check soil erosion, prevent/check siltation of reservoir and to maintain its storage
capacity in the long run.
1.10.1. Activities to be Undertaken
1.10.1.1 Normal Afforestation
In critically degraded areas, plantation of locally useful diverse and indigenous plant
species such as timber plantation species, fodder species, fuel wood species,
grasses, shrubs and legumes, medicinal and aromatic plants would be undertaken.
The forestation will include rising of multi-tier mixed vegetation of suitable local
species in the steep and sensitive catchment areas of rivers/streams with the
objective of keeping such areas under permanent vegetative cover. Furthermore,
degraded areas would also be brought under vegetation cover. Suitable trees of
economic value to local people shall be raised in the degraded forest areas near to
villages with the objective of supplementing income of the villagers.
With a view to conserve and augment the state’s rich medicinal plant resources in its
natural habitat through adaptive and participatory management of the local people,
cultivation of high priority medicinal plant species shall be undertaken. Thrust shall be
given to organic cultivation of medicinal plants.
Effective fencing would also be provided for protection of saplings. Before any new
area is taken up, eradication of weeds and unpalatable grass species is important. It
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 32
is, therefore, recommended that some parts of the pasture should be closed for
seeding purpose only.
1.10.1.2 Enrichment Plantation
There are a few locations within forest in the catchment area where the crown
density is poor and plantation can be done to increase the patch density of crop. In
such areas, plantation of 600 seedlings per hectare is likely to create dense forest.
1.10.1.3 High Density Energy Plantation
In order to reduce the biotic pressure on the forest areas near the villages, high
density energy plantation in forest areas and barren areas under the village can help
in long way to solve the ever-increasing problem of scarcity of fodder and fuel wood
in hilly areas. To overcome the problem of scarce availability of fodder and fuel it is
proposed to bring substantial area by planting 5000 trees/ha with suitable fast
growing species.
1.10.1.4 Treatment of Alpine Pasture
These are high altitude areas situated in alpine / sub-alpine zones. The flora is
herbaceous and the pastures have the potential to support regulated grazing. These
areas continuously remain under snow from late October to late March. Therefore,
they are in supine state for about six months. The restoration and management of
degraded alpine pasture is a vital objective, both to provide sufficient habitat for
spatial movement of the spill over species outside and within catchment area and to
provide biological resources to the local populace. The alpine pastures have their
own unique significance in the geophysical, environmental and socio-economic set-
up of the region. They are the prime and continual source of herbage for the wild
herbivores which are prey base for carnivores, cattle, sheep and goats. These
pastures are extensively grazed by the live stocks of the local people during
summers for 3-4 months and also frequented by large herds of goats and sheep
which are brought-in and encamped by the migratory grazers (Gadi) from plains. The
large scale and indiscriminate grazing of these pasture over a prolong time has left
these pastures ominously degraded. The palatable grasses are no more than a few
inches tall and the other related pasture species have also started showing signs of
stress. As a result of continuous and heavy pressure of grazing, barren patches have
developed over vast areas and soil erosion is rampant in these alpine pastures.
There is an imperative need to address this abysmal and alarming situation
immediately before these pastures are brought to such a condition, where, their
rejuvenation becomes impossible. Owning to traditional rights of the grazers, it is
difficult to restrict the number of animals grazing there. Thus the only alternative left
is to increase the productivity of these pastures to cope with the grazing pressures.
The situation warrants for a realistic survey and allied research in context of entire
grazing issues and formulation of an action plan for corrective measures within the
gambit of the state policy on the subject matter. Till such time the following
recommendations are made for the management of pastures.
Assessment of the carrying capacity of the pastures through surveys so as to ascertain allowable size of live stocks.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 33
Periodical field checking of the size of the herds mentioned in the permits so as to avoid misuse by some permit holders.
Public awareness.
Periodical closure of areas in pastures for the proliferation of seeds of desirable grass species.
Implementation of rotational deferred grazing system to derive the advantage of early nutritive growth and rest period during the growing season.
Interaction with the local people and the migrating grazers so that a sort of social fencing could be achieved.
Assessment of the carrying capacity of alpine pasture and grazing land in forests. Role of different categories of livestock and their grazing requirement needs to be investigated.
1.10.1.5 Nursery Support
In order the meet the huge requirement of saplings required under biological / bio-
engineering measures and reservoir rim treatment new nursery has to be developed
along with support to the existing nurseries which shall also augment the supply of
saplings for the works proposed.
1.10.1.6 Soil Bioengineering
Soil bio-engineering is state-of-the-art using the living vegetation, either alone or in
conjunction with non-living plant material and civil engineering structures, to stabilize
slopes and/or reduce erosion. Such measures utilize live plants and plant parts,
either alone or in conduction with non-living plant material and hand measures
usually referred to as civil engineering structures, where they provide additional
mechanical support to soil, present barriers to earth movement, function as hydraulic
drains, and act as hydraulic pumps. Soil bio-engineering system use live plant
cuttings, rooted plants, and plant stems that are placed in the ground, or in earthen or
other structures that commonly incorporate inert materials such as rock, wood, geo-
synthetics, geo-composites or other products.
Control of severe landslide or gully erosion usually requires engineering structures to
avoid slope failure and gully cutting. However, such measures involve exorbitant
investment and a high degree of technology. It has been experienced that lack of
timely and adequate maintenance has resulted in spectacular failure of measure
under taken and the resultant erosion is more serious than before the treatment.
The exclusive use of vegetative measures for control of major land slide and severe
gully erosion often results in failure. However, when vegetative measures are
combined with engineering measures, i.e. bio-engineering, the end result can be
effective stabilization of the area from mass movement and gully cutting, and
dramatic reduction of surface erosion, at relatively low cost and high sustainability
and with added benefit of fodder and fuel wood production for local people.
The successful results of bio-engineering techniques have been observed in gully
control, waste land reclamation and slope stabilization. By for these have been
observed to be economically desirable and most-effective for erosion control in
degraded area.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 34
Soil bio-engineering measures shall be adopted in landslide zones and area
degraded due to road excavation. The work shall involve fixing of brush wood check
dams, spraying of grass and legume seeds, plantation of trees @ 1100 trees/ha,
fencing of the area and maintenance for three years. The most common method of
hill and slope stabilization is the seeding of grass and herb mixture.
Dry Seeding is an easy method where seed (5 g/sq.m.) and organic fertilize (100
g/sq.m.) are scattered by hand or machine. It can be applied on flat slopes with rough
surfaces. It is also possible to use hay-flowers instead of common seeds.
On steeper slopes where it is necessary to cover the soil quality, a cover crop
seeding is used. Special types of rye (in fall) and barley (in spring) are spread in a
mixture of 5 gm/sq.m. and covered with soil. On the surface normal seed (5 g/sq.m.)
are spread.
On less steep slope with rough surface and no erosion problems tree and shrub
seeding can be spread. Seeds of trees and shrubs are mixed with sand in a ratio of
1:3 and spread as broadcast, pit oar row seeding.
1.10.1.7 Civil Structures
Brush wood Check Dams and Retaining Walls Brushes wood check dams are useful in arresting further erosion of depressions,
channels, and gullies on the denuded landslides. In addition, retaining walls of stone
masonry and RCC would be constructed to provide support at the base of threatened
slopes.
Slope Modification by Stepping or Terracing The slope stability increases considerably by grading it. The construction of steps or
terraces to reduce the slope gradient is one of the measures.
Bench Terracing The area under moderately steep slope i.e. between 100-150 slopes would be
subjected to bench terracing. The local people would be convinced to follow this type
of terracing for comparatively better yield and with minimum threat to erosion.
Moreover, in a number of habitations in the catchment such practices are already
visible. While making bench terraces, care will have to be taken not to disturb the
topsoil by spreading earth from the lower terraces to higher terraces. The vertical
intervals between terraces will not be more than 1.5m and cutting depth may be kept
at 50 cm. The minimum average width of the terrace would be kept from 4 to 5 m in
order to enable usage of prolong hinge. The shoulder bunds of 30 x 15 cm would
also be provided. Staggered channels will drain off the excess water from the
terraces.
Gully Control-Check Dams Gullies are mainly formed on account of physiographic, soil type, and heavy biotic
interference in an area. The scouring of streams at their peak flows and sediment-
laden run-off cause gullies. The gullies would be required to be treated with
engineering/mechanical as well as vegetative methods. Check dams would be
constructed in some of the areas to promote growth of vegetation that will
consequently lead to the stabilization of slopes/area and prevention of further
deepening of gullies and erosion. Different types of check dams would be required
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 35
for different conditions comprising of different materials depending upon the site
conditions and the easy availability of material (stones) at local level and transport
accessibility. Generally, brush wood check dams are recommended to control the
erosion in the first order basin/streams in upper reaches and dry random stone
masonry check dam shall be provided in the lower reaches where discharge is
higher. In such stream where discharge and velocity of flow are still higher gabion
structure shall be provided. Lower down the sub-watershed, i.e., in the third order
drainage silt retention dams in the form of gabion structure shall be provided.
Stream bank Protection Stream bank erosion is caused by variety of reasons such as destruction of
vegetative cover, mass movement on unstable bank slopes, undermining of top
portion of lower bank by turbulent flow and sliding of slopes when saturated with
water. The Stream Bank Protection would include wire crate boulder spurs in two to
three tiers depending upon the high flood level of the streams.
Contour Staggered Trenches Contour staggered trenches are mainly provided to trap the silt and runoff. This is
also done to prepare a fertile base for plantation, in moderately steep to very, very
steep slopes.
Landslide Control Rainfall pattern of the area and water seepage coupled with geological formation
results in landslides. Water plays an important role in triggering of landslides and
mass wasting processes along with other factors such as slope and nature of
soil/land-cover/land-use. However, most of the landslides are caused by human
negligence. Road construction, overgrazing of hill slopes, felling of trees for timber,
fuel, and fodder and upslope extension of cultivation are some of main causes of
landslides. Gabion structures shall be provided at the base of the land slide zones to
control the toe erosion by water.
Catch-water Drains Among the most effective, practical and least expensive measures of landslide
hazard management is construction of catch-water drains for run-off and surface
waters in the identified hazard-prone zone so that little or no water is able to infiltrate
into the ground. All the streams and minor water courses would be diverted around
the crown of the slide or the potentially hazardous area through catch water drains
with an adequate gradient. The catch water drain when provided avoids runoff to
pass over such vulnerable areas and water is guided through these drains provided
on foothill or along the katcha/pucca roads. The ground surface of threatened area is
leveled out to eliminate all depressions where water can accumulate
1.11. Cost Analysis of Different Works Under Biological Measures
1.11.1. Afforestation
Out of the total stock to be planted under afforestation, 20% species shall be tree
species having medicinal values and 10% of fruit bearing wild species useful to
wildlife shall also be planted. The cost analysis per hectare of afforestation, with
three strands barbed wire fencing stretched across creosoted wooden fence posts
reinforced with two layers of live hedge plants inclusive of maintenance for three
years has been worked out as Rs. 36,500/- ha as shown in Table 1.9.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 36
Plantation under normal afforestation component shall be carried through identified
user groups in catchment area. Plantations will be maintained for three years. For
mobilization of user group provision of funds has been made under the plan.
The cost of works under normal afforestation component encompassing the free
draining catchment area of the project has been assessed as Rs. 710.29 lac and is
shown in Table 1.10.
Table 1.9 : Per Ha. Cost Norms for Model Plantation Works
A] Plantation:
S. No. Name of Scheme Component With B/ Wire
A i) Afforestation ii) Re-afforestation of Scrub
Area (1100 plants per ha.)
Fencing cost
Planting cost
6396
12857
Sub-Total Wages 19253
Material cost
Other material cost
Cost of plants raised
(Rs. 3.50 / Plant)
3500
1100
3850
Total 27703
Say Rs. 28000
B] Maintenance:
S. No. Name of Scheme Component With B/ Wire
B Maintenance Cost
First Year Maintenance Maintenance cost 4300
Second Year Maintenance Maintenance cost 2800
Third Year Maintenance Maintenance cost 1400
Total Maintenance Rs. 8500
C Total Cost per Ha. for Afforestation including maintenance for
three years.
Rs. 36500
Table 1.10 : Cost Estimate for Afforestation Measures
SWS No. Name of SWS Area under
Afforestation (Ha.)
Cost @ Rs. 36500/- Ha. (Rs. in lac)
1D1D1(1) Kirthai 552 201.5
1D1D2(1) Ligri 460 167.9
1D1D2(2) Pilali 414 151.1
1D1D2(3) Machel 230 84.0
1D1D2(4) Gulabgarh 460 167.9
1D1D3(1) Dharlang 414 151.1
1D1D3(2) Bhuzah 276 100.7
1D1D3(3) Bharaj 104 37.8
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 37
1D1D3(4) Bhazun 104 37.8
3013 1099.7
1.11.2. Enrichment Plantation
The cost analysis of enrichment plantation per hectare with 600 plants and protection
of thorny bushes / twigs for individual plant, with no maintenance cost has been
assessed as Rs. 14500/ha as shown in Table 1.11. The cost of works under
enrichment plantation for the SWS encompassing the free draining catchment area of
the project has been assessed as Rs. 97.44 lac and is shown in Table 1.12.
Table 1.11 : Cost Analysis per ha. of Enrichment Plantation
Sl.
No.
Name of Scheme Component Cost (Rs.)
1 Enrichment plantation with
600 plants/ha and thorny
brush wood protection for
each plant with no
maintenance cost
Fencing – thorny brush wood
protection for individual plant
5250.00
Planting cost 7013.00
Sub Total-Wages 12263.00
Cost of 600 plants raised in P.
bags @ Rs. 3.50 /Plant
2100.00
Grand Total 14363.00
Or say 14500.00
Table 1.12 : Cost Estimate for Enrichment Plantation
SWS No. Name of SWS Area under
Afforestation (Ha.)
Cost @ Rs. 14500/- Ha. (Rs. in lac)
1D1D1(1) Kirthai 192 27.8
1D1D2(1) Ligri 160 23.2
1D1D2(2) Pilali 144 20.9
1D1D2(3) Machel 80 11.6
1D1D2(4) Gulabgarh 160 23.2
1D1D3(1) Dharlang 144 20.9
1D1D3(2) Bhuzah 96 13.9
1D1D3(3) Bharaj 36 5.2
1D1D3(4) Bhazun 36 5.2
1048 152.0
1.11.3. High Density Energy Plantation
The cost analysis of high density energy plantation per hectare with plantation of
5000 plants /ha, with five strand barbed wire fencing stretched across creosoted
wooden fence posts reinforced with two layers of live hedge plants, has been
assessed as Rs. 90,000/ha as shown in Table 1.13. The cost of works under high
density energy plantation for each of the SWS forest, encompassing the free draining
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 38
catchment area of the project, has been assessed as Rs. 730.80 lac and is shown in
Table 1.14.
Table 1.13 : Cost Analysis per ha. of High Density Energy Plantation
A. Plantation
Energy / High Density Plantation Cost Norms Per Ha.
(5000 plants per Ha. with Barbed wire Fencing)
Sl.
No.
Name of Scheme Component With B/ Wire
(Rs.)
1 Energy/ High Density
Plantations
Fencing Cost
Planting Cost
6400
58440
i. Sub Total-Wages 64840.00
Material Cost
Other Material Cost
6000
1600
(ii) Sub Total- M&S 7600.00
(iii) Cost of 5000 Plants raised in P.
bags @ Rs. 3.50 /Plant
17500.00
Total i+ii+iii 89940.00
Or Say 90000.00
Table 1.14 : Cost Estimate for High Density Energy Plantation
SWS No. Name of SWS Area under
Afforestation (Ha.)
Cost @ Rs. 90000/- Ha. (Rs. in lac)
1D1D1(1) Kirthai 228 205.2
1D1D2(1) Ligri 190 171.0
1D1D2(2) Pilali 171 153.9
1D1D2(3) Machel 95 85.5
1D1D2(4) Gulabgarh 190 171.0
1D1D3(1) Dharlang 171 153.9
1D1D3(2) Bhuzah 114 102.6
1D1D3(3) Bharaj 43 38.5
1D1D3(4) Bhazun 43 38.5
1245 1120.1
1.11.4. Pasture Reclamation
The cost analysis of pasture reclamation by rotational closure with live hedge
fencing, sodding with local grass and legume plants inclusive of maintenance has
been assessed as Rs. 65,000/ha is shown in Table 1.15. The cost of works under
treatment of alpine pastures for the SWS encompassing the free draining catchment
area of the project has been assessed as Rs. 263.90 lac and is shown in Table 1.16.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 39
Table 1.15 : Cost analysis of treatment of alpine pasture
Sl. No. Particulars of Works Quantity Rate Amount for non-
tribal area
A. Fencing Work
1. Survey and demarcation of plantation
area including making of sections, path
and preparation of map
1 ha 102/ha 102.00
2. Live hedge fencing 400 RM 13.25/RM 5300.00
Total fencing cost 5402.00
Or say 5400.00
B. Planting
1. Weeding of obnoxious weeds 1 job LS 4000.00
2. Preparation of patches 45 cm x 45 cm x
25 for sowing of legume plants
500 No. 490.75/% 2453.75
3. Sowing of seeds in patches 45 cm x 45
cm x 25 cm
500 No. 143.25/% 716.25
4. Digging of pits 30 cm x 30 cm x 25 cm 500 No. 477.25/% 2386.25
5. Filling of pits 30 cm x 30 cm x 25 cm 500 No. 272.75/% 1363.75
6. Carriage of plants from nursery to road
side by road including loading and
unloading over a distance of 10 km.
500 No. 1500/trip 1500.00
7. Carriage of plants from road side to
plantation site by manual labour over a
distance of 2 km.
500 No 436/% per 2
km
2180.00
8. Planting of plants 500 No. 184/% 920.00
9. Preparation of strips including sowing
along contour at 100 x 30 x 5 cm at
interval of 2 m for grass sowing
800 No. 920.25/% 7362.00
10. Application of vermin compost / organic
manure
01 job LS 800.00
11. Carriage of fertilized to work site over a
distance of 5 km by manual labour
0.5 Q 76.54/Q/km 191.35
12. Moisture retention intervention including
V-ditches
1 Job LS 8500
13. Cost of fertilizer seeds 1 Job LS 5500
Total B-Planting 37873.35
Grand Total (A + B) 43273.35
Or Say 43300.00
C. Second Year Maintenance Operation
1. Re-digging of pits 30 cm x 30 cm x 25
cm
125 No. 238.63/% 298.28
2. Filling of pits 30 cm x 30 cm x 25 cm 125 No. 272.75/% 340.94
3. Carriage of plants from nursery to road
side by road including loading and
unloading over a distance of 10 km.
125 No. 625/trip 625.00
4. Carriage of plants from road side to
plantation site by manual labour over a
distance of 2 km.
125 No. 436/%/2 km 545.00
5. Planting of plants 125 No. 184/% 230.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 40
Sl. No. Particulars of Works Quantity Rate Amount for non-
tribal area
6. Cost of plants 125 No. 3.50/No. 437.50
7. Re-preparation of strips including sowing
along contour at 100 x 30 x 5 cm at
interval of 2 m for grass sowing
200 No. 920/% 1840.50
8. Cost of fertilizer and seeds 1 job LS 4400.00
Total 8717.22
Or say 8700.00
D. Third Year Maintenance Operation
1. Re-digging of pits 30 cm x 30 cm x 25
cm
100 No. 238.63/% 238.63
2. Filling of pits 30 cm x 30 cm x 25 cm 100 No. 272.75/% 272.75
3. Carriage of plants from nursery to road
side by road including loading and
unloading over a distance of 10 km.
100 No. 500/trip 500.00
4. Carriage of plants from road side to
plantation site by manual labour over a
distance of 2 km.
100 No. 436/%/2 km 436.00
5. Planting of plants 100 No. 784/% 784.00
6. Cost of plants 100 No. 3.50/No. 350.00
7. Re-preparation of strips including sowing
along contour at 100 x 30 x 5 cm at
interval of 2 m for grass sowing
160 No. 920/% 1472.00
8. Cost of fertilizer and seeds 1 job LS 2450.00
Total 6503.38
Or say 6500.00
E. Fourth Year Maintenance Operation
1. Re-digging of pits 30 cm x 30 cm x 25
cm
100 No. 238.63/% 238.63
2. Filling of pits 30 cm x 30 cm x 25 cm 100 No. 272.75/% 272.75
3. Carriage of plants from nursery to road
side by road including loading and
unloading over a distance of 10 km.
100 No. 500/trip 500.00
4. Carriage of plants from road side to
plantation site by manual labour over a
distance of 2 km.
100 No. 436/%/2 km 436.00
5. Planting of plants 100 No. 784/% 784.00
6. Cost of plants 100 No. 3.50/No. 350.00
7. Re-preparation of strips including sowing
along contour at 100 x 30 x 5 cm at
interval of 2 m for grass sowing
160 No. 920/% 1472.00
8. Cost of fertilizer and seeds 1 job LS 2450.00
Total 6500.00
Or say 6500.00
Abstract
Sl. No. Particulars Cost
1. First year operation 43,300.00
2. Second year-maintenance operation 8,700.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 41
3. Third year-maintenance operation 6,500.00
4. Fourth year-maintenance operation 6,500.00
Total 65,000.00
Table 1.16 : Cost Estimate for Treatment of Alpine Pastures
SWS No. Name of SWS Total Area to
be treated Area under
Afforestation (Ha.)
Cost @ Rs. 65000/- Ha. (Rs. in
lac)
1D1D1(1) Kirthai 1200 114 74.1
1D1D2(1) Ligri 1000 95 61.8
1D1D2(2) Pilali 900 86 55.6
1D1D2(3) Machel 500 48 30.9
1D1D2(4) Gulabgarh 1000 95 61.8
1D1D3(1) Dharlang 900 86 55.6
1D1D3(2) Bhuzah 600 57 37.1
1D1D3(3) Bharaj 225 21 13.9
1D1D3(4) Bhazun 225 21 13.9
6550 622 404.5
1.11.5. Nursery Support
In the light of the fact that the CAT plan entails plantation over approximately 4550 ha
area, a huge requirement of saplings / plants is comprehended. Such requirement
shall have to be met out from the existing nurseries which are too inadequate to meet
the requirement. Being a mountainous area the suitable sites for developing new
nurseries are not too many. Besides, the free of cost saplings shall be distributed to
the JFM group for raising horticulture crops and private pasture development.
Availability of quality planting material well in time and in close proximity to the areas
where afforestation is to be undertaken, remains a major constraint in implementation
of large scale afforestation. The proposed large scale afforestation in the area due to
establishing of various hydroelectric projects, will certainly lead to establishment of
decentralized nurseries through credit support.
The Cost Estimates for Implementing Nursery Support is given in Table 1.17. The
overall cost under nursery support is reckoned as Rs. 80.0 lac.
Table 1.17 : Cost Estimates for Implementing Nursery Support
S. No. Item Amount (Rs.
in Lac)
1. Nursery equipment’s/ tools 8.00
2. Barbed wire fencing with RCC post/ repair of barbed-wire fencing in
existing nurseries.
5.00
3. Preparation of additional beds in existing nurseries, soil layering in
nurseries, establishment of Poly-house/ Poly-tunnels, soil working,
establishment of compost and vermin-compost units, strengthening of
irrigation facilities, providing insecticides, etc.
15.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 42
4. Establishment of two new nurseries @ Rs. 25.00 lacs/ha 50.00
5. Miscellaneous 2.00
Total 80.00
1.12. Cost Analysis of Different Works Under Soil And Water Conservation Measures
1.12.1. Bio-engineering Works
Bio-engineering works shall involve minor soil conservation works, fixing of brush
wood check dams, patch sowing of grass and legume seeds, plantation of bio-
engineering species of shrubs, herbs and trees i.e. @ 1400 shrubs and 500 trees/
ha., fencing of the area with live hedge and maintenance for 1 year of shrub species
and 2 years for tree species. The cost analysis per ha of bio-engineering works
comprising of plantation, seed spraying, brush wood check dams, 10 per hectare
keeping in view the severity of gullies, fencing cost and maintenance has been
assessed as Rs. 1,28,000/- and is given in Table-1.18. The cost of works under bio-
engineering measures for the SWS and encompassing the free draining catchment
area of the project has been assessed as Rs. 519.68 lac and is shown in Table-1.19.
Table 1.18 : Cost Analysis per ha of Bio-Engineering Works
Bio-Engineering Cost Norms for Degraded Forest Lands (Per Hectare) (Live Hedge
Fencing)
A] First Year Operations:
S. No. Detail of Works Quantity Rate
(Rs.)
Amount
(Rs.)
1 Survey and demarcation of plantation area, marking
of sections, path and preparation of map.
1 Hectare 102/
Hectare
102
2 Preparation of inspection path. 200 Rm 10.75/Rm 2150
3 Live hedge fencing with Agave, Ipomea, Dodonia,
etc.
300 Rm 13.25/Rm 3975
4 Preparation of gradonial trenches/ staggered
trenches (1 X 0.3 X 0.3 m)
700 Rm 13.50/Rm 9450
5 Digging of 1400 pits on mounds of trenches (2 pits
per mound) 20 X 20 X 20 cms.
1400 Nos. 170/%
Nos.
2380
6 Filling of pits 20 X 20 X 20 cms. 1400 Nos. 75/%
Nos.
1050
7 Planting of 1400 nos. plants (P Bags) on mounds (2
pits per mound) inclusive of carriage of plants.
1400 Nos. 218.25/%
Nos.
3056
8 Preparation of patches of grass/ legume sowing (0.3
X 0.3 X 0.3 m) inclusive of carriage of plants.
700 Nos. 327.13/%
Nos.
2290
9 Sowing of grass/legume seeds in patches 700 Nos. 95.38/%
Nos.
668
10 Cost of raising plants [P. bags (6”x4”)/Root trainers]in
the Nursery
1400 Nos. 3.5 per
plant
4900
11 Cost of grass/legume seed 15 Kg. 400/ Kg 6000
12 Minor / small soil conservation activities as small gully
plugging, brushwood check dams etc. (10 No./ha)
10 Nos. 3000 per
No.
30000
13. Large gully plugging by means of 5 m long, 2 m high 05 Nos. 2800 per 14000
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 43
S. No. Detail of Works Quantity Rate
(Rs.)
Amount
(Rs.)
are R.R Dry stone masonry No.
TOTAL 80,029
Or say 80,000
B] Second Year - Maintenance Operations:
S.
No.
Detail of Works Quantity Rate
(Rs.)
Amount
(Rs.)
1 Strengthening/ support to live-hedge fence
(approx. 30%).
300 Rm 13.25 per Rm 3975
2 Soil conservation activities as small gully
plugging, brushwood check dams etc.
03 Nos. 3000/ No. 9000
TOTAL 12,975
Or say 13,000
C] Third Year Operations, Planting of 500 Plants:
S. No. Detail of Works Quantity Rate (Rs.) Amount(Rs.)
1 Strengthening/ support to live-hedge fence
(approximately 20%).
60 Rm 13.5/ Rm 795
2 Digging of pits (60 X 60 X 60 cm) 500 Nos. 1745/
hundred
8725
3 Filling of pits (60 X 60 X 60 cm) 500 Nos. 354.38/
hundred
1771.90
4 Carriage of plants raised in Polythene Bags
(P Bags) of size 4”*6”, from nursery to
roadside by road including loading &
unloading over a distance of say 10 kms.
500 plants
(1 trips)
1500/- per
trip.
1500
5 Carriage of plants (P Bags) from roadside to
plantation site by manual labour over a
distance of 2 kms.
500 plants 436/%/ 2 Km 2180
6 Planting of P. Bags plants 500 Nos. 218.25/
hundred
1091.25
7 Cost of raising plants in P. Bags. 500 Nos. 3.50/ plant 1750
8 Minor small soil conservation activities as
Small gully plugging, brushwood check dams
etc.
02 3000/ Ha. 6000
TOTAL 22823.15
Or say 22,800.00
D] Fourth Year Maintenance Operations:
S.
No.
Detail of Works Quantity Rate
(Rs.)
Amount
(Rs.)
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 44
1 Re-digging of pits (60 X 60 X 60 cm) – 25%
mortality.
125 Nos. 1049.63/
hundred
1312.03
2 Filling of pits (60 X 60 X 60 cm) 125 Nos. 354.38/
hundred
442.98
3 Carriage of plants raised in Polythene Bags
(P Bags) of size 4”*6”, from nursery to
roadside by road including loading & unloading
over a distance of say 10 kms.
125 plants
625/- per trip. 625.00
4 Carriage of plants (P Bags) from roadside to
plantation site by manual labour over a
distance of 2 kms.
125 plants 436/%/ 2 Km 545.00
5 Planting of P. Bags plants 125 Nos. 218.25/
hundred
272.81
6 Cost of raising plants in P. Bags. 125 Nos. 3.50/ plant 437.50
7 Minor small soil conservation activities as
Small gully plugging, brushwood check dams
etc.
01 3000/ No.. 3000.00
TOTAL 6.635.32
Or say Rs. 6600
E] Fifth Year Maintenance Operations:
S.
No.
Detail of Works Quantity Rate
(Rs.)
Amount
(Rs.)
1 Re-digging of pits (60 X 60 X 60 cm) – 15%
mortality.
75 Nos. 1049.63/
hundred
787.22
2 Filling of pits (60 X 60 X 60 cm) 75 Nos. 354.38/
hundred
265.79
3 Carriage of plants raised in Polythene Bags (P
Bags) of size 4”*6”, from nursery to roadside
by road including loading & unloading over a
distance of say 10 kms.
75 plants
500/- per trip. 500
4 Carriage of plants (P Bags) from roadside to
plantation site by manual labour over a
distance of 2 kms.
75 plants 436/%/ 2 Km 327.00
5 Planting of P. Bags 75 Nos. 218.25/
hundred
163.69
6 Cost of raising plants in P. Bags. 75 Nos. 3.50/ plant 262.50
7 Minor small soil conservation activities as
Small gully plugging, brushwood check dams
etc.
01 3000/ No. 3000
TOTAL 5306.20
Or say Rs. 5300
ABSTRACT
Sl.
No.
Particular Amount
(Rs.)
1 First Year Operations 80,000.00
2 Second Year Maintenance Operations 13,000.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 45
3 Third Year Operations, Planting of 500 Plants 22,800.00
4 First year maintenance of plants planted in 3rd year 6,600.00
5 Second year maintenance of plants planted in 3rd year 5,300.00
Total Cost per Ha. 1,27,700
Or say Rs. 1,28,000
Table 1.19 : Cost Estimate for Bio-Engineering Works
SWS No. Name of SWS Total Area
to be treated
Area under Afforestation
(Ha.)
Cost @ Rs. 128000/- Ha. (Rs. in lac)
1D1D1(1) Kirthai 1200 114 145.9
1D1D2(1) Ligri 1000 95 121.6
1D1D2(2) Pilali 900 86 109.4
1D1D2(3) Machel 500 48 60.8
1D1D2(4) Gulabgarh 1000 95 121.6
1D1D3(1) Dharlang 900 86 109.4
1D1D3(2) Bhuzah 600 57 73.0
1D1D3(3) Bharaj 225 21 27.4
1D1D3(4) Bhazun 225 21 27.4
6550 622 796.5
1.12.2. Cost Analysis of Vegetative Structure, Civil Structures for Land Slide and Stream Bank Stabilization and Moisture Retention Operations
These structures are to be constructed as land slide control and stream bank
stabilization over visually active slides and eroded banks of the main river and its
tributaries falling under “Severe” and “Very Severe” erosion intensity areas to control
the sediment flow and further degradation of the free draining catchment areas.
Since these measures are to be carried out by construction of individual structure
such as wire crate spurs, check dams, contour staggered trenches, catch water
drains, retaining walls etc. on site specific basis, the cost of each of such structure
has to be analyzed on the basis of dimensions adopted. The analysis of rates of such
structures is presented in Table 1.20.
Table 1.20 : Cost Analyses of Structures
S. No. Item Quantity Unit Rate Amount
1. Dry Rubble Stone masonry (DRSM)
Check Dam
(a) Excavation in foundation with 50% soft
rock & 50% E & B involving peak and
jumper work in 5.60 m x 1.80 m x 0.50 m
= 5.04 cubic meter
5.04 Cum 224.88 1133.39
(b) Collection of boulder 23.52 Cum 175.25 4121.88
I-Step 5 x 1.5 x 1.25 = 9.38
II – Step 7 x 1.0 x 0.75 = 5.25
Wing Walls 2 x 3.75x 0.6 x 1.5 = 6.75
Total 21.38 x1.1= 23.52
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 46
(c) Carriage of boulder by manually beyond
initial 100 m lead up to 1 km
21.38 Cum 561.00 11994.18
(d) Labour charges for dry stone masonry with
outer face stone dressed & 100 m lead.
21.38 Cum 277.50 5932.95
Total 23182.40
Add 3% Contingencies 695.47
Grand Total Rs. 23877.87
Say Rs. 24000.00
2. Wire Crate Check Dam
(a) Excavation in foundation with 50% soft
rock & 50% E & B involving peak and
jumper work in 6.60 m x 2.30 m x 0.50 m =
7.59 cubic meter
7.59 Cum 224.88 1706.84
(b) Collection of boulder 35.24 Cum 175.25 6175.81
Foundation Step - 6.0 x 2.0 x 1.0 m = 12
cubic meter
I- Step - 6.0 m x 1.9m x 1.0m = 11.40
cubic meter
II- Step – 6.0 m x 1.8m x 0.8 m = 8.64
cubic meter
Total requirement of boulder = 32.04 x 1.1
= 35.24 cubic meter
(c) Carriage of boulder manually average lead
1 km
32.04 M3 561.00 17974.44
(d) Weaving of wire netting of GI wire mesh
size 15 cm x 15 cm
113.2 M2 21.75 2462.10
Foundation Step-2(6x2+6x1+2x1) = 40 m2
I- Step-2(6x1.9+6x1+2x1) = 38.8 m2
II- Step- 2(6x1.8 + 6x0.8 + 2x0.8) = 34.4
m2
Total = 113.2 m2
(e) Filling of boulder and hand packing in wire
crates
32.04 M3 144.25 4621.77
(f) Cost of GI wire 2.25 Qtl 8000 18000.00
(g) Carriage of GI wire manually to an
average lead of 1 km
2.25 Qtl 83.50 187.88
Total Rs. 51128.84
Add 3% Contingencies 1533.86
Grand Total Rs. 52662.70
Say Rs. 52700
3. Wire crate boulder spurs (large size) for
stream bank protection of main river
(a) Excavation in foundation with 50% soft
rock & 50% E & B
9.5 m x 3.0 m x 0.5m = 14.25 cubic meter 14.25 Cum 224.88 3204.54
(b) Collection of boulder
18.0 (2.25 m x 1.25 m x 1.25 m) = 63.28
cubic meter
63.25 Cum 175.25 11089.82
(c) Carriage of boulder manually for average
lead 1 km
63.28 Cum 561.00 35500.08
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 47
(d) Filling of boulder and hand packing in Wire
crates 2.25m x 1.25m x 1.25 in three tiers
i.e. 8 in first tier 6 and 4 each in second
and third tier respectively
63.28 Cum 144.25 9128.14
(e) Cost of G.1 wire crates
18 x 14.375 = 258.75 sq. m.
258.75 Sq. m . 165.00 42693.75
(f) Carriage of G.1. wire crate manually to an
average lead of 1 km
5 Qtl 83.50 417.50
Total 102033.8
3
Add 3% Contingencies 3061.01
Grand Total 105094.8
4
Say Rs. 105000.00
4. Double row brush wood check dam
(a) Cutting of conversion of vegetative posts 40 No. 1295.25/
%
518.00
(b) Carriage of vegetative posts to 5 km.
distance @ Rs. 207.95 per hundred
number per km.
40 No. 1817/%/
5 km
727.00
(c) Digging of holes for vegetative posts 40 No. 906.75/
%
363.00
(d) Fixing of vegetative posts 40 No. 696.13/
%
278.00
(e) Fixing of vegetative spurs double row 12 RM 58.38/R
M
700.00
(f) Filling of gaps between rows of brush
wood with the bundles of bushes and tied
with ropes of grass
01 Job LS 400.00
Total 2986.00
Or Say 3000.00
5. Catch water drain in cement stone
masonry per RM
a. Excavation in formulation with 50% soft
rock and 50% E & B
1 x 1.50 x 0.55 = 0.825 cubic meter
0.825 Cum 224.88 185.53
b. Foundation concrete (CC 1:3:6)
1 x 1.50 x 0.15 = 0.225 cubic meter
0.225 Cum 3125.00 703.13
c. RR stone masonry in cement mortar 1 : 6
2 x 0.4 x 0.4 = 0.32 cubic meter
0.32 Cum 2550 816.00
d. Flush cement pointing
2(0.4+0.4) = 1.6 sq.m.
1.60 Sq.
m.
70 112.00
Total 1816.60
Add 3% Contingencies 54.50
Grand Total 1871.10
Or Say 1870.00
6. RCC retaining wall 6 m high/RM
a. Excavation in soft rock
1 x 3.6 x 0.5 = 1.80 cubic meter
1.80 Cum 292.50 526.50
b. Concrete M:20 (CC 1:1.5:3)
Base = 1 x 3.60 x 0.4 = 1.44
3.29 Cum 4700 15463.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 48
Stem = 1 x 5.60 x 0.33 = 1.85
Total = 3.29 cubic meter
c. Steel reinforcement at 1% i.e. 40 kg/cubic
meter = 1.32 Qt
1.32 Qt 6000 7920.00
d. Shuttering / form work
Base = 2 x 3.60 = 7.20
Stem = 2 x 5.60 = 11.20
Total = 18.40 sq.m.
18.40 Sq.
m.
134 2465.60
Total 26374.50
Add 3% Contingencies 791.24
Grand Total 27165.74
Or say 27200.00
7. RR Dry stone masonry / RM
Average dimension = 5 m long, 2m high
and side slope 1:4
a. Excavation in foundation with 50% soft
rock and 50% E & B
5 x 1.10 x 0.3 = 1.65
1.65 Cum 224.88 371.05
b. RR stone masonry dry
5 x (1.10 + 0.60 / 2) x 2.0 = 8.5 cum
8.5 Cum 277.50 2358.75
Total 2729.80
Add 3% Contingencies 81.89
Grand Total 2811.69
Or say 2800.00
8 Bench terracing / ha excavation
a. Earth work 100 Cum 157.25 15725.00
Total 15725.00
9 Contour staggered trenches / ha
excavation
75 Cum 224.88 16866.00
Say 17000.00
1.12.3. Abstract of Works under Civil Structures
The Break-up of works under different sub-watersheds in respect of vegetative
structure, civil structures for land slide and stream bank stabilization and moisture
retention operations with their costs is shown in Table 1.21.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 49
Table 1.21 : Abstract of Works under Civil Structures
Code Name of
SWS
DRSM @ Rs. 0.24 lac each
Wire Crate Check Dam @ Rs. 0.53 lac
each
RR Dry Stone Masonry @ 0.028
lac/RM
Catch Water Drain @ 0.0187
lac/RM
Contour Staggered Trenches @
0.17/ha Total Cost (Rs. lac)
Number Cost Number Cost Number Cost RM Cost ha Cost
1D1D1(1) Kirthai 70 16.80 35 18.55 150 4.20 150 2.81 10 1.70 44.06
1D1D2(1) Ligri 60 14.40 30 15.90 130 3.64 200 3.74 15 2.55 40.23
1D1D2(2) Pilali 45 10.80 40 21.20 140 3.92 200 3.74 30 5.10 44.76
1D1D2(3) Machel 30 7.20 35 18.55 200 5.60 250 4.68 40 6.80 42.83
1D1D2(4) Gulabgarh 40 9.60 45 23.85 250 7.00 175 3.27 25 4.25 47.97
1D1D3(1) Dharlang 30 7.20 15 7.95 150 4.20 175 3.27 15 2.55 25.17
1D1D3(2) Bhuzah 35 8.40 25 13.25 200 5.60 250 4.68 20 3.40 35.33
1D1D3(3) Bharaj 20 4.80 20 10.60 160 4.48 150 2.81 25 4.25 26.94
1D1D3(4) Bhazun 20 4.80 20 10.60 140 3.92 150 2.81 25 4.25 26.38
Total 350 84 265 140.45 1520 42.56 1700 31.79 205 34.85 333.65
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 50
1.13. Treatment of Private Land
The silt contribution of private land holding is very significant because it interrupts the
natural drainage and contributes to heavy soil erosion as compared to the other land
use categories like dense forest/open forest. Therefore, better land management shall
help in reducing the sediment flow besides increasing the land productivity by way of
proposed soil cover to increase soil moisture content. Therefore, it is proposed to
provide treatment to private holdings for development of horticulture, agriculture and
private pasture development under SWS Kirthai, Ligri, Pilali, Gulabgarh and Machail..
An area of 60 ha and 20 ha have been earmarked to be undertaken for horticulture
and private pasture development respectively under this plan as a joint venture with
the owners of the land with their share of the cost being the cost of maintenance.
Besides this, terracing in 250 ha area along with some engineering measures to
control erosion/sliding witnessed in the agricultural land is also proposed. The cost of
works proposed under this head work out to Rs. 79.74 lac and is shown in Table
1.22.
Table 1.22 : Cost of private land treatment
S. No. Particular Quantity Unit Rate Amount (Rs
Lac)
(A) Biological Measures
1 Horticulture Development 60 ha 50000.00 30.00
2 Private Pasture
Development.
20 ha 60000.00 12.00
Sub Total (A) 42.00
(B) Soil Conservation &
Retention Measures
1 Bench Terracing 240 ha 15725.00 37.74
Sub Total (B) 37.74
Grand Total (A) + (B) 79.74
1.14. Cost of Other Components of Cat Plan
Apart from the forestry works and drainage line treatment in the catchment area there
are other aspects of the CAT Plan to be addressed and their cost included in the
overall cost estimate of the plan. The eco-restoration works, livelihood support works,
social mobilization, documentation and publication, monitoring and evaluation and
providing environmental services are some of the integral ingredients which have to
be considered and included while formulating the CAT plans.
1.14.1. Implementation of Support Infrastructure Cost
In order to execute the catchment area treatment plan, the forest department would
be requested to establish a catchment area treatment cell for which the executing
agency shall need necessary infrastructure support. Accordingly, provisions have
been made for purchase of office equipment and inspection vehicles with O & M
charges for ten years including maintenance period for plantation. For movement of
the field staff and labour, forest footpath and bridges/culvers would need construction
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 51
and repair. Besides, the forest staff shall have to camp nearby the site of work for
which the existing rest houses would require extension and improvements. The cost
of works proposed under the head works out to Rs. 70.0 lac and is shown in Table
1.23.
Table 1.23 : Cost Estimate for Support Infrastructure
S.
No.
Particular Quantity Unit Rate (Rs. in
Lac)
Amount
(Rs. in Lac)
(A) Officer Equipment’s
1 Purchase of Computers complete
with accessories and Laser printer
4 No. 0.50 2.00
2 Purchase of Photocopy Machine 2 No. 1.00 2.00
3 Purchase of Fax Machine 6 No. 0.10 0.60
4 Purchase of GPS and Survey
instruments
LS - - 3.40
5 Purchase of inspection vehicles 4 No. 8.00 32.00
6 O & M charges of inspection
vehicles
4x5 No. 1.5/yr 30.00
Total 70.00
1.14.2. Fuel Wood Saving Devices
In order to reduce the pressure in the forest particularly for fuel wood exerted by
villagers living near forest areas under the catchment, who are totally dependent upon
the fuel wood for cooking purpose some alternate source of energy, is to be provided.
It is proposed to provide LPG gas connection with cylinder at subsidized cost.
Beneficiary under this component shall be the weaker section of society; families
headed by women and scheduled caste households. The Principle for providing
subsidy and cost sharing by the beneficiaries shall be as follows;
i) For Women Headed Households : 100% subsidy
ii) For Schedule Cast Households : 90% subsidy and 10% cost sharing
Identification of women headed households and Schedule Cast households should
be backed by data available with Panchayat Secretary and with local NGOs. Besides
LPG, the stakeholders in the catchment shall be provided solar pressure cooker and
electricity saving device like LED with each household distributed 8 LED during the
project period. The break-up of cost under different non-conventional and fuel saving
devices is shown in Table 1.24. An amount of Rs. 47.0 lac is earmarked for this
activity under the CAT Plan.
Table 1.24 : The Break-up of Cost under Different Non-conventional and Fuel Saving Devices for Stake-holders
S.
No.
Item Quantity Rate (Rs.) Amount
(Rs. in lac)
1. LPG Gas connection
a. At 100% subsidy 500 3500.00 17.50
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 52
b. At 90% subsidy 500 3150.00 15.75
2. Solar cooker @ 50% subsidy 1000 1000.00 10.00
3. LED 1000 x 08 = 8000 no. @ 50%
subsidy
8000 50.00 4.00
Total 47.25
Say Rs. 47.00
1.14.3. Training and Extension Programme
There is a need to keep all members of the existing registered VFDCs and
committees to be constituted in other villages and NGOs involved in programme
implementation so that they can play an active role in implementation of the CAT plan
by associating with the development work in their areas. For this purpose, people
need to be trained in respect of different measures for habitat improvement by
afforestation techniques, nursery development, pasture development, soil
conservation and moisture retention works, horticulture development and agriculture
practices in respect of land under the CAT plan with special thrust to local technique
with the use of indigenous material without deteriorating ecology of the area. The
technique of river-training work needs to be explained properly so that desired results
are achieved. For this purpose, a training programme has to be properly devised and
carried out at range office for which a provision of Rs. 12.00 lac is being made.
1.14.4. Provision for Micro Plans
Based on the ground truth reality in each of the village forest department committee
or society under different sub-watersheds, comprehensive micro plan for execution of
the work has to be prepared as per norms. The micro plan for each beats of sub-
watershed shall be prepared in consultation with the members of concerned VFDCs
with due regards to the environmental functions and productive potential of the forests
and their carrying capacity. For this purpose, a provision of Rs. 15.00 lac is being
made.
1.14.5. Provision for Proper Documentation
Emphasis should be laid on the publicity of the work proposed under the plan and
work carried out on annual basis so that transparency is maintained and proper
documentation of the work is also carried out for future reference, and testing the
efficacy of the work in due course of time. On this count a provision of Rs. 5.00 lac is
proposed. The documentation would inter alia include implementation report,
progress reports, photography, videography etc. Publication of the work done may be
distributed to concerned panchayat and village Forest Development
Committees/Societies for wider dissemination.
1.14.6. Gender Support
By far women folk are more industrious than men in the hills. There is a need to keep
them in center stage in programme implementation so that they can play an active
role in preservation of the ecology as well as the socioeconomic development of the
area. Considering the immense potential and genuine needs for women’s
participation in JFM programme, proper training with respect to work related to NTFP
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 53
cultivation, animal husbandry, gardening and farm works etc. shall be imparted for
which a provision of Rs. 10.00 lac is being made.
1.14.7. Provision for Mobilizing User Groups
Based on the ground truth reality in each of the Village Forest Development
Committee or Society falling under the different sub-watersheds, mobilizing the user
groups will be of utmost importance so as to involve them in afforestation and other
agreed activities of the CAT Plan. For this purpose, a provision of Rs. 3.0 lac is being
made.
1.14.8. Funds for Educational Activities related to Medicinal Plant Sector
A provision of Rs. 10.00 lac is earmarked for various conservation and educational
activities related to medicinal plant sector.
1.14.9. Development of Eco-tourism
Trekking routes with camping facilities can help to boost eco-tourism in the area.
Concept of “Homesteads” can be promoted. Such host families who are enterprising
and having reasonable traditional accommodation in the village en-route to good eco-
treks can accommodate tourists on payment basis. Such financial support to rural
people can boost the activity. Involvement of local youths can provide self-
employment services like guides, porters, and making arrangements for boarding and
lodging of eco-tourists. The poor families can earn wages by portering or other small
works. Eco- tourism societies can be formulated under the overall control of the
special purpose vehicle (SPV) arrangement for anchoring the eco-tourism activities.
There exists scope for eco-tourism in the area where tourists can see its wild virgin
and pristine glory and catching the everlasting enthralling moments in their mind while
enjoying and learning the nature. Therefore, a provision of Rs 50.00 lac is made on
this.
1.14.10. Provision for Floristic Survey and Forestry Research
Though a provision has been made in environment monitoring plan for ecosystem
monitoring including environmental studies during construction and post
constructional stages respectively, an additional provision of Rs 10.0 lac is made for
carrying out floristic survey of the area after complete implementation of CAT Plan,
i.e., immediately after the fifth year of maintenance.
1.14.11. Provision for Monitoring and Evaluation
The success of implementation of a CAT Plan can be fathomed by increase in vegetal
cover on hill slopes and the enhancement. Various engineering and biological
measures have been aimed at treating degraded and potential areas of severe to very
severe soil erosion by increasing soil holding capacity and thus reducing sediment
flow in the water. Therefore, for recording soil and silt data at regular intervals one
small laboratory/observatory each shall be established at dam site on the Chenab and
at Gulabgarh, where the regular discharges of the streams and silt samples shall be
monitored twice a day for ten years.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 54
A close watch on annual basis shall be maintained in respect of such areas where
habitat improvement works have been carried out so as to verify the work executed
on site itself and also to ascertain the rate of survival of plants and / or any damage to
the new work. For monitoring of works under forestry operation, the use of remote
sensing technique by using digital satellite imagery of IRS P6 LISS-III with high
resolution (2.5 m x 2.5 m) should be made obligatory. The monitoring through satellite
scene should be done before commencement of works under CAT plan and in a block
of two years after completion of CAT plan. The work of monitoring of various works
under the CAT plan should be entrusted to an external agency which has long
experience of carrying out similar work on land use data and evaluating environment
impact.
A provision of Rs. 147.00 lac is being made for monitoring and evaluation activities
including the expenditure likely to be incurred on conducting meetings / seminar /
workshops at the head quarter and outside. This will include payments made to the
non-official members of the monitoring evaluation committee on accounts of their
expenditure on traveling and boarding etc. The payment to the external agencies shall
also be met out from this part.
1.14.12. Provision for Providing Environmental Services
A provision of Rs. 500.00 lac is being made under this sub-head for carrying out such
works which enhance the environmental status and also reduce the adverse impact
on the environment and ecology. Funds for identified and approved activities for
Payment for Environmental Services have also been provided under this component.
The scheme inter-alia includes construction of contour trenches, incentives for fire
protection on private as well as on government land/forests, provision of funds for live
hedge fence on private land and Payment for Environmental Services as per
approved J & K Forest Department activities and norms.
The silt contribution of private landholding is very significant. The agriculture land is
not developed properly and coupled with faulty agricultural practices, like interrupting
the natural drainage, contributes heavy soil erosion as compared to the other land
use categories like dense forest/ open forest. Therefore, better land management
shall help in reducing the sediment flow besides increasing the land productivity by
way of arresting the loss of soil cover and increased soil moisture content.
Accordingly, funds for the following activities on private lands will be made available:
1. Live hedge fencing of private lands - Payment shall be made as per schedule of rates of labour and works of respective Forest Circle, as applicable on the date of establishment of live hedge fence.
2. Contour trenches in private land – norms to be fixed in consultation with Agriculture Department.
3. Incentives for prevention of forest fires shall be provided village-wise.
Fire management and control plan expenditure for the catchment area will be done
under the PES Component. For success and survival of bio-engineering plantations,
protection against the fire will also be very important. In general protection against
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 55
forest fire hazards and incidents following indicative action points are proposed to
manage and control fire in the catchment area;
To prevent and tackle fire incidences awareness campaign against the fire hazards and involvement of local people in controlling and prevention of fire incidences to be ensured.
Identification of sensitive hot-spots on past record and accordingly increased patrolling by deploying of appropriate manpower during fire-season.
Maintenance of fire-lines as per the Working Plan.
Winter control burning to be ensured as per the Working Plan.
Strengthening of communication network to ensure timely and immediate response to tackle fire incidences.
Enforcing fire rules and regulations especially during the fire season.
Need based fire equipment be purchase and to be kept at appropriate places.
Fire watch towers and fire huts to house equipment and manpower during fire season be constructed based on requirement after getting approval from the Conservator of Forests.
For nomadic tribes, who migrate along with sheep and goats across the area,
necessary veterinary assistance by providing medicines and other support to maintain
hygiene and health of the animal stock based on the suggestions of local veterinary
office will be provided at pre-identified sites along with time schedule to be worked out
as per the migration period/ time. The cost of medicines and other assistance based
on realistic assessment and inputs from Veterinary Office/ Department will be charged
to PES.
1.14.13. Provision for Forest Protection
The need for rigorous watch and ward of the forest covered under the catchment area
becomes more imperative in view of proposed new plantation under the CAT plan and
due to increased human activity in the form of labour, who shall be engaged for
forestry works. Thus, fire protection measures including construction and
maintenance of fire lines, construction of check-posts, watch towers have to be
undertaken. Besides these construction / repair of forest boundary pillars shall also be
carried out. The forest staff shall have to be properly equipped with modern utility
gadgets like walky-talky, GPS and fire-fighting equipment’s. For these a provision of
Rs. 50.00 lacs is being earmarked.
1.14.14. Capacity Building
Since the effectiveness of the biological and engineering measures and their proper
implementation will depend on the understanding and preparedness of the forest
staff. It is important that the Forest Department makes efforts to sensitize the staff on
implementation and management of plantation issues, soil conservation, flood
protection works and also provide guidance and encourage them to build requisite
capacities. Capacity building can be achieved through training programmes for which
a provision of Rs. 10.00 lacs has been made in the plan.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 56
1.15. Institutional Mechanism
1.15.1. Role of Project Proponent
The forest department would implement the Catchment Area Treatment Plan. A joint
inspection group is suggested that would include officers drawn from State Forest
Department of J & K. and officials from the Environment Cell of the J&K State Power
Development Corporation. The management will have liaison with the forest officials.
As far as the financial disbursement to undertake activity involvement of various stake
holders and collaborative public participation should be encouraged to have
transparency in the system.
1.15.2. CAT Implementation
The designated Environmental Officer of J&K State Power Development Corporation
would coordinate with the forest department for the implementation of the proposed
Plan. The Environment Officer would evaluate/monitor financial aspects. The
modalities of financial disbursement need to be worked out. The implementing agency
shall submit completion certificate in the light of guidelines fixed by the J & K Forest
Department. The implementation of CAT Plan should have enough flexibility and
should be subject to changes as per requirements of specific ecosystem and periodic
gains. A monitoring committee as per the MoEF guidelines such as Kirthai CAT Plan
Society with its headquarters at Kishtwar may be constituted for the project for
administrative guidance and smooth realization of targets.
1.15.3. Project Monitoring and Reporting Procedures
Meetings would be held every three months to resolve problems arising in plan
implementation. A Joint committee may be formed with the Environment Cell of J&K
State Power Development Corporation and State Forest Department; the team
members must ensure implementation and monitoring of the CAT works and review
the progress from time to time. Quarterly progress reports and completion certificates
would be submitted to J & k State Power Development Corporation for evaluation and
disbursement of finance. In addition, the work done should be published through
public awareness campaigns. Visual and print media may be used to gain maximum
benefit by beneficiaries. Such efforts would resolve conflicts which otherwise are
potential sources for project delays.
1.16. Summary of Cost of Works
The cost of all works proposed in the CAT plan is enumerated in Table 1.25.
Table 1.25 : Cost Estimate of CAT Plan
S. No. Particulars Amount
(Rs. In Lac)
1 Habitat treatment works under free draining catchment
(a) Normal afforestation (3013 ha @ Rs. 36500/- per ha) 1099.7
(b) Enrichment Plantation (1048 ha @ Rs. 14500/- per ha) 152
(c) High density energy plantation (1245 ha @ Rs. 90000/- per ha) 1120.1
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 57
(d) Pasture reclamation (622 ha @ Rs. 65000/- per ha) 404.5
(e) Nursery support 80
Sub- total (1) 2856.3
2 Soil and water conservation measures
(a) Bio-engineering measures (622 ha @ 128000/ha) 796.5
(b) DSRM check dam (350 no. @ 24000/ha each) 84.00
(c) Wire crate check dam (265 no. @ 52700/each) 140.45
(d) RR dry stone masonry (1520 RM @ 1870/RM) 42.56
(e) Catch water drain (1700 RM @ 1870/RM) 31.79
(f) Contour staggered trenches (205 ha @ 17000/ha) 34.85
Sub- total (2) 1130.15
3 Private land treatment
(a) Horticulture development (60 ha @ 50000/ha) 30
(b) Private pasture development (20 ha @ 60000/ha) 12
(c) Bench terracing (240 ha @ 15730/ha) 37.74
Sub- total (3) 79.74
4 Implementation of Support Infrastructure Cost 70
5 Fuel wood saving devices 47
6 Training and Extension Programme 12
7 Provision for Micro Plan 15
8 Documentation 5
9 Gender Support 10
10 Mobilizing user groups 3
11 Funds for Educational activities related to medicinal plant sector 10
12 Development of Eco-tourism 50
13 Provision for floristic survey and forestry research 10
14 Provision for Monitoring and Evaluation Activities 142
15 Provision for providing Environmental Services 500
16 Forest Protection 50
17 Capacity building 10
Sub-Total Sr. No. 4 to 17 934
Grand Total 5000.19
Say Rs. 5000
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 58
2. COMPENSATORY AFFORESTATION SCHEME
2.1. General
The compensatory afforestation scheme would be implemented through Forest
Department of Jammu & Kashmir as per integrated afforestation programme. This
includes activities like soil conservation works, fencing, protection, awareness,
monitoring and evaluation along with maintenance for a period of five years.
In hills, trees and other vegetation cover have an important role in the conservation of
ecosystem. Due to increase in the demand of fuel wood, fodder and grazing, the
pressure in the project area adds to the loss of forests due to project development.
The vacant land devoid of trees exists in the region. It is very essential to create more
resources for fuel wood to check further degradation in the area where most of the
human and livestock population stays. This shall provide vegetal cover to barren
slopes to check soil erosion and cater to the increasing demand of fuel wood and
fodder. The plan envisages afforestation on the following model of plantation scheme.
The plantation of vacant land would be carried out depending on plant species. Soil
binding species are proposed to be planted @ 1500 plants per ha. Similarly, broad –
leaved species meant mainly for their fodder and fuel wood utility shall be planted at
the rate of 1500 plants per ha. Fuel wood species will be planted with fodder species.
As there is great pressure of grazing, it is proposed to raise mixed plantation of fuel
wood and fodder together. Each plantation shall have at least 20-30 % of fodder
species and 40 – 50% fuel wood species including few timber species.
2.1.1. Land requirement of the Project
Overall land requirement of the project is 225.25 ha out of which 142.25 ha is forest
land, 43.00 ha is private land and 40.0 ha is revenue land. The project shall submerge
140.00 ha of land comprising of 70.00 forest land, 33.0 ha revenue land and 37.0 ha
private land. The breakup of land required including submergence area, land in
respect of different project components, colonies and offices, road, muck disposal
area and borrow / quarry area is given in Table 2.1.
Table 2.1 : Land Requirement of Submergence and Project Component
Sr.
No.
Component Area of Land, ha Total, ha
Forest Govt. Private
1 Submergence 70.00 33.00 37.00 140.00
2 Project Components 24.00 - - 24.00
3 Quarry Sites 18.40 - - 18.40
4 Muck Disposal Sites 12.85 - - 12.85
5 Colony area - 4.00 4.00 8.00
6 Batching plant/ store /
steel yard
2.00 3.00 1.00 6.00
7 Road / Access roads 15.00 - 1.00 16.00
Total 142.25 40.00 43.00 225.25
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 59
The total forest land requirement of 142.25 ha for the project falls under Kishtwar
Forest Division at Kishtwar. The J&K forest protection act, 1997 provides that in case
of diversion of forest land for non-forestry purposes, compensatory afforestation shall
be carried out, if non-forest land is unavailable, in double area of the degraded forest
land. As such, compensatory afforestation is proposed in lieu of 142.25 ha of forest
land, proposed to be diverted, in double of the degraded forest area i.e. 285 ha to be
carried out through the agency of forest department.
The scheme has been formulated to compensate for the loss of forest due to
construction of project and its appurtenant works, quarry site and aggregate crushing,
dumping areas, approach roads to adits, other amenities and infrastructure facilities.
The compensatory afforestation scheme has to be systematically implemented along
with other soil conservation measures and barbed wire fencing i.e. protection
measures to mitigate biotic interference. The species to be planted would be area
specific; to meet the basic needs of the people with respect to fuel wood, fodder, and
timber with an objective on ecological balance and conservation.
2.1.2. Plant species identified for afforestation
The following plant species (Table 2.2) have been identified based on soil and climate
conditions of the proposed compensatory afforestations areas.
Table 2.2 : List of Plant Species Identified for Afforestation
S. No. Trees Local name
1 Ulmus wallichiana Kashmir Elm
2 Populus nigra Populus
3 Morus alba Mulberry, Shehtoot, tuta
4 Pyrus pashia Indian wild pear
5 Prunus armenica Plumcot, Khubani
6 Pyrus malus Apple, Saib
7 Ailanthus excelsa Ardusi, Peeda
8 Aesculus indica Goo Green, Indian Horse Chestnut
9 Juglans regia Walnut, Akhrot
10 Robinia pseudoacacia Black Locust
11 Salix alba White Willow
12 Xanthoxylum armatum Winged prickly-ash
13 Alnus nitida Champ, Himalayan Alder
14 Celtis australialize Khirak
15 Prinsipia utilis Himalayan Cherry
Besides, the above tree species, the shrub species identified for plantations are;
Cotoneaster bacillaris, Colutea nepalensis, Elaeagnus umbellata, Spiraea canescens
and Rosa webbiana.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 60
2.2. Methodology and Components
The degraded forest land has large portion of barren hill slopes, and is devoid of trees
observed from field studies. Soil working and plantation along contours conserves soil
and enhances moisture regime and adverse effects of surface run – off is reduced
considerably. Pits along contour reduce velocity of water, increase moisture and
seepage of water in soil and reduce loss resulting in better growth of plants. Hence
soil works and plantation shall be strictly followed along the contours.
In afforestation areas for digging pits along the contours, it is necessary to first align
contour lines with the contour template and then pits should be dug along the contour
lines, Generally, 30 x 30 x 45 cm size pits are dug in 60% of the area and 45 m x 45
m x 45 m size in 40% of the area leaving a space of 1.5 m between two consecutive
pits or depending on the species to be planted. Then the soil is collected after
removing pebbles and weeds, the pit is half refilled with soil mixed with humus or
fertilizer. For digging 1500 pits per ha pits are dug 15 cm uphill from the contour. The
spacing of pits along contour trenches should not be closer than 1.5 m.
In afforestation areas working should be started in May and completed by September
in context of cold desert areas otherwise should be started in October and completed
by March. It is important that the filling of trenches should not be left to be done along
with plantation during rains to avoid soil wash. Extreme care should be taken in
transporting plants to avoid any damage. Plantation should be done well in time
during rains and few species that get leafless in winter can be planted during winter
rains. The plants in the pits near contour trenches get more moisture and grow fast.
Raising vegetative barrier of hedges has been found very useful not only for soil and
water conservation but also for fuel wood production.
2.2.1. Seedling Requirements
During the first year of the scheme implementation the seedling are to be obtained
from the existing nurseries of Forest Department and in due course of time some new
nurseries should be developed near the compensatory afforestation areas to meet the
requirement of plant seedlings for compensatory afforestation.
2.2.2. Nursery Development
Nurseries would be developed with 6 to 8 seedbeds each and 6-8 beds for potted
plants. On an average 2.5 ha of land is required for nursery development. Nursery
sapling would be developed for species identified for compensatory afforestation
scheme. The Nursery development works should be started from the first year so that
they can suffice the needs of supply of plant sapling from second year or so. The
Nursery area should be near to the road plantation areas and should have irrigation
facilities. It is also suggested that existing nursery at Gulabgarh under Paddar range
and another Nagsani range of Kisthwar forest department should be taken up for
remodeling under this scheme.
2.2.3. Fencing and Closure
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 61
A minimum block plantation in a compact area of 5 ha. or as available would be
undertaken by providing wooden post fencing including watch and ward for assuring
protection from biotic interference.
2.2.4. Beating Up
In case of longer spells of draught, sites with adverse natural conditions, some
mortality of plants is bound to occur requiring beating of dead. Considering the
mortality rate to vary from 30% to 10% after first year plantation to 5th year. Beating
up should be done as actually required. In southern slopes where moisture stress is
more the requirement of replacement may be more.
2.2.5. Delineation of Area for Compensatory Afforestation
The delineation of the area where compensatory afforestation is to be carried out
under the guidelines of the MoEF, is the prerogative of the State Forest Department
and depends upon the availability of the degraded forest land in any part of the state
preferentially in the district where the project is proposed but not necessarily in the
project area. Thus, at this juncture it is not feasible to indicate such area on a map.
However, some degraded forest area in Shirir forest on the left bank of the Chenab
under Atholi Forest Block and area above Sora and Shigilash Forest on the right bank
of the Chenab and Bhut Nala under Machel Forest Block can be brought under the
afforestation plan.
2.3. Cost Estimates for Plantation Per Ha Land
Based on average of 5 ha plot of 250 m x 200 m, per ha cost model for afforestation
of degraded forest land cost of compensatory afforestation per ha has been worked
out in Table-2.3.
Table 2.3 : Per Ha Cost Norm for Model Plantation Works (Under CAT / Compensatory Afforestation Works)
(1500 plants per ha with RCC fence posts)
S.
No.
Particulars of Work Quantity Rate
Amount
for Non-
Tribal Area
A. Fencing Work
1 Survey and demarcation of plantation
area including marking of sections, path
and preparation of map
1 ha 85.10/ha 85.10
2 Preparation / purchase of RCC fence
posts 2m long 60 Nos. 200/No. 12,000.00
3 Carriage of fence post upto 2 m long
over distance 2 kms. 60 Nos. 568.03/Km 681.63
4 Preparation / digging of holes 20-30 cm
dia and 50 cm deep 60 Nos. 755.50/hundred 453.30
5 Fixing of posts including strutting 60 Nos. 580.01/hundred 348.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 62
S.
No.
Particulars of Work Quantity Rate
Amount
for Non-
Tribal Area
6 Carriage of B/wire over average
distance of 2 km uphill 0.90 qtls 142.00/Qtl/Km 255.61
7 Stretching and fixing of barbed wire with
U-staples in each strand (4 stands) 720 Rmt 3.96/Rmt 2851.20
8 Preparation of inspection path 60 cm
wide 250 Rmt 8.96/Rmt 2240.00
9 Preparation of water retention mounds /
trenches LS - 2000.00
10 Interlacing of thorny bushes in B/wire
obtained from planting site 180 Rmt 3.33/Rmt 599.40
Total Fencing Works Cost 21,514.24
B-Planting
1 Digging of pits 45 cm x 45 cm x 45 cm
(40% of total) 600 Nos 795.19/hundred 4771.14
2 Digging of pits 30 cm x 30 cm x 30 cm
(60% of total) 900 Nos 397.64/hundred 3578.76
3 Filling of pits 45 cm x 45 cm x 45 cm 600 Nos 227.26/hundred 1363.56
4 Filling of pits 30 cm x 30 cm x 30 cm 900 Nos 158.93/hundred 1430.57
5 Carriage of naked root plants over
distance 2 Km uphills (BL as well as
conifers)
600 Nos 29.37/hundred/Km 352.44
6 Carriage of plants in P/bags over
distance 2 km up hills 900 Nos
181.64/hundred.K
m 3269.52
7
Planting of entire plants raised in P/bags 900 Nos 181.85/hundred 1636.65
8 Planting of naked root plants 600 Nos 153.31/hundred 918.60
9 Planting of grass tufts / preparation of
strips including sowing in strips 100 m x
30 m x 5 cm for grass sowing along
contour
500 strips 766.75/hundred 3833.75
Total Planting Cost 21,154.99
C-Material
1 Cost of barbed wire 0.9 Qtl 7000 per Qtl 6,300.00
Nursury Cost of Plants
1 Naked root plants 600 Nos 6.0/plant 3,600.00
2 Polythene bags plants 900 Nos 8.0/plant 7,200.00
Total Material Cost 17,100.00
Grand Total (A + B + C) 59,769.23
Or Say 60,000.00
D. Maintenance Cost
1st year maintenance 30% mortality
1 Re-digging of pits 45 cm x 45 cm x 45
cm 180 Nos 397.64/hundred 715.75
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 63
S.
No.
Particulars of Work Quantity Rate
Amount
for Non-
Tribal Area
2 Re-digging of pits 30 cm x 30 cm x 30
cm 270 Nos 198.82/hundred 536.81
3 Filling of pits 45 cm x 45 cm x 45 cm 180 Nos 227.26/hundred 409.07
4 Filling of pits 30 cm x 30 cm x 30 cm 270 Nos 158.93/hundred 429.11
5 Planting of polythene bags plants 270 Nos. 181.85/hundred 491.00
6 Planting of naked root plants 180 Nos 153.31/hundred 275.96
7 Planting of grass tufts / preparation of
strips including sowing in strips 100 m x
30 m x 5 cm for grass sowing
200 Nos 766.75/hundred 1533.50
8 Carriage of polythene bags plants over a
distance of 2 km uphill 270 Nos 181.64/hundred/km 980.86
9 Carriage of naked root plants over a
distance of 2 km uphill 180 Nos 29.37/hundred/km 105.73
10 Nursery cost of plants in polythene bags 270 Nos 8.00/plant 2160.00
11
Nursery cost of naked root plant 180 Nos 6/plant 1080.00
12 Repair of fence 180 Rmt 1.53/Rmt 275.40
13 Repair of inspection path L.S. L. S. 700.00
14
Moisture conservation works L.S. L.S. 1000.00
Total Maintenance Cost 10693.19
Or Say 10,700.00
2nd year maintenance 20% mortality
1 Re-digging of pits 45 cm x 45 cm x 45
cm 120 Nos 397.64/hundred 477.17
2 Re-digging of pits 30 cm x 30 cm x 30
cm 180 Nos 198.82/hundred 357.84
3 Filling of pits 45 cm x 45 cm x 45 cm 120 Nos 227.26/hundred 272.71
4 Filling of pits 30 cm x 30 cm x 30 cm 180 Nos 158.93/hundred 286.07
5 Planting of polythene bags plants 192 Nos 181.85/hundred 349.15
6 Planting of naked root plants 108 Nos 153.31/hundred 165.57
7 Carriage of polythene bags plants over a
distance of 2 km up hills 192 Nos 181.64/hundred 697.50
8 Carriage of naked root plants over a
distance of 2 km up hills 108 Nos 29.37/hundred/km 63.44
9
Nursery cost of plants in polythene bags 192 Nos 8/plant 1536.00
10 Nursery cost of naked root plant 108 Nos 6.00/plant 648.00
11 Repair of fence 180 Rmt 1.53/Rmt 275.40
12 Repair of inspection path L. S. 500.00
13
Moisture conservation works L. S. L. S. 800.00
Total 2nd Year Maintenance Cost 6428.85
Or Say 6400.00
3rd Year maintenance 10% mortality
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 64
S.
No.
Particulars of Work Quantity Rate
Amount
for Non-
Tribal Area
1
Redigging of pits 45 cm x 45 cm x 45 cm 60 No. 397.64/hundred 238.58
2
Redigging of pits 30 cm x 30 cm x 30 cm 90 No. 198.82/hundred 178.38
3 Filling of pits 45 cm x 45 cm x 45 cm 60 Nos. 227.26/hundred 136.36
4 Filling of pits 30 cm x 30 cm x 30 cm 90 No. 158.93/hundred 143.04
5 Planting of polythene bags plants 90 No. 181.85/hundred 163.67
6 Planting of naked root plants 60 No. 153.31/hundred 91.99
7 Carriage of polythene bags plants over a
distance of 2 km up hills 90 No.
181.64/hundred/K
m 326.95
8 Carriage of naked root plants over a
distance of 2 km up hills 60 No. 29.37/hundred/Km 35.24
9
Nursery cost of plants in polythene bag 90 No. 8/plant 720.00
10 Nursery cost of naked root plant 60 Nos. 6/plant 360.00
11 Repair of fence 200 Rmt 1.53/Rmt 306.00
12 Repair of inspection path L. S. - 400.00
13 Moisture conservation works L. S. 800.00
Total 3rd Year Maintenance Cost 3900.21
Or Say 3900.00
4th Year maintenance 10% mortality
1 Re-digging of pits 45 cm x 45 cm x 45
cm 60 Nos. 397.64/hundred 238.58
2 Re-digging of pits 30 cm x 30 cm x 30
cm 90 Nos 198.82/hundred 178.38
3 Filling of pits 45 cm x 45 cm x 45 cm 60 Nos. 227.26/hundred 136.36
4 Filling of pits 30 cm x 30 cm x 30 cm 90 Nos 158.93/hundred 143.04
5 Planting of polythene bags plants 90 Nos 181.85/hundred 163.67
6 Planting of naked root plants 60 Nos. 153.31 /hundred 91.99
7 Carriage of polythene bags plants over a
distance of 2 km up hills 90 Nos 181.64/hundred/km 326.95
8 Carriage of naked root plants over a
distance of 2 km up hills 60 Nos. 29.37/hundred/km 35.24
9
Nursery cost of plant in polythene bag 90 Nos 8/plant 720.00
10 Nursery cost of naked root plant 60 Nos. 6/plant 360.00
11 Repair of fence 200 Rmt 1.53/Rmt 306.00
12 Repair of inspection path L. S. 300.00
13
Moisture conservation works L. S. 700.00
Total 4th Year Maintenance Cost 3700.21
Or Say 3700.00
5th Year maintenance 10% mortality
1
Redigging of pits 45 cm x 45 cm x 45 cm 60 Nos. 397.64/hundred 238.58
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 65
S.
No.
Particulars of Work Quantity Rate
Amount
for Non-
Tribal Area
2
Redigging of pits 30 cm x 30 cm x 30 cm 90 Nos 198.82/hundred 178.38
3 Filling of pits 45 cm x 45 cm x 45 cm 60 Nos. 227.26/hundred 136.36
4 Filling of pits 30 cm x 30 cm x 30 cm 90 Nos 158.93/hundred 143.04
5 Planting of polythene bags plants 90 Nos 181.85/hundred 163.67
6 Planting of naked root plants 60 Nos. 153.31/hundred 91.99
7 Carriage of polythene bags plants over a
distance of 2 km up hills 90 Nos 181.64/hundred 326.95
8 Carriage of naked root plants over a
distance of 2 km up hills 60 Nos. 29.37/hundred 35.24
9
Nursery cost of plants in polythene bag 90 Nos 8/plant 720.00
10 Nursery cost of naked root plant 60 Nos. 6/plant 360.00
11 Repair of fence 200 Rmt 1.53/Rmt 306.00
12 Repair of inspection path L. S. 300.00
13 Repair of soil and moisture conservation
works L. S. 500.00
Total 5th Year Maintenance Cost 3500.21
Or Say 3500.00
Abstract
Amount (in
Rs.)
New plantation cost 60,000.00
I year maintenance cost 10,700.00
II-year maintenance cost 6400.00
III-year maintenance cost 3900.00
IV-year maintenance cost 3700.00
V-year maintenance cost 3500.00
Grand Total 88200.00
2.4. Payment of Net Present Value Of Land Transferred
In the wake of MoEF&CC New Delhi Circular F. No. 5-1 / 98-FC (Pt-II), dated 17/18
September,2003, in pursuant to the order issued by the Hon’ble Supreme Court of
India, the State Government shall have to charge from the user agency the Net
Present Value (NPV) of land to be converted for non-forestry purposes under the
Forest (Conservation) Act, 1997, depending upon the quantity / density and type of
species, within the range specified there in. In the present context, the value of NPV
of the forest land in question at Rs. 8.97 lac/ha (0.4 – 0.6 canopy density) has been
assessed as Rs. 1276.00 lacs.
2.5. Cost Estimate of Compensatory Afforestation Works
Based on per ha cost of Rs. 88,200.00 per ha for compensatory afforestation works
with maintenance cost for 5 years for an area of 285 ha proposed under the scheme
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 66
the cost works out to be Rs 251.37 lacs. Besides this the executing agency shall also
require infrastructure support incidental to the execution of works and upkeep of the
record etc. The project proponent shall also pay compensation for enumerated
standing trees in the forest land to be diverted. The overall cost including NPV of
forest land proposed to be diverted has been assessed as 1800.00 lacs as shown in
Table 2.4.
Table 2.4 : Total Cost of Scheme
Sl.
No.
Particulars Quantity Rate Amount
(Lakh)
1. Total area for compensatory afforestation 285 88,200/ha 251.37
2. Implementation of Support Infrastructure
Cost.
0
(a) Purchase of PC Complete with
accessories and laser printer.
4 50000/No. 2.00
(b) Purchase of Xerox machines. 4 1, 00000/No. 4.00
(c) Purchase of Fax machine. 4 15,000/No 0.60
(d) Purchase of Vehicle 3 10,00,000/No 30.00
(e) O & M of Vehicle for 7 years @ Rs 1.00 lac
per year per vehicle
3 x 7 1,00,000/Yr. 21.00
(f) Cost of Forest land (NPV) 142.25 8.97/ha 1276.00
3 Compensation for trees @ twice the
standard rate in current schedule
1 Job L.S. 130.00
4 Cost of transportation of saplings L.S. 1.00
5 Extraction and carriage of firewood to be
extracted from the enumerated trees
L.S. 24.00
6 Extraction of standing volume to be
extracted from the enumerated trees
L.S. 50.00
7 Miscellaneous expenses and cost
escalation for timber and firewood
extraction
L.S. 10.00
Grand Total 1799.97
Say (Rs.) 1800.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 67
3. WILDLIFE AND BIODIVERSITY MANAGEMENT PLAN
3.1. Objective
This plan envisages the conservation of biodiversity and sustenance of mountain livelihood
as long term goals. A plan for conserving the biodiversity of the area, ecological
rehabilitation of the tract by pasture development and enrichment, afforestation and land
stabilization measures, improving water regime, control of illicit poaching are some of the
steps to protect and conserve the biodiversity of the area.
Eco-development of the area in addition of aforementioned factors will include sustaining
mountain livelihoods, community development, eco-tourism promotion and protection of
cultural values. To achieve these goals, the objectives of the plan are as under:
i. To improve the habitat and protect the species found in the sanctuary.
ii. To support mammalian fauna including a number of rare and endangered species
found in Kishtwar National Park, J & K.
iii. Carrying out soil stabilization works in erosion prone areas by constructing bio-
engineering/engineering structures to consume and reduce soil erosion.
iv. Promotion of LPG and non-conventional energy to resources so as to reduce pressure
on natural resources.
v. To support livelihood enhancing components so as to reduce the dependence of the
local population on natural resources.
vi. To undertake rural infrastructure and community development works in the area so as to
get their involvement in biodiversity conservation.
vii. To promote eco-tourism and generate awareness regarding environmental values
among local masses especially school children.
viii. To build capacity and impart professional training to the sanctuary staff.
ix. To establish research and monitoring mechanism for effective implementation and
achievement of plan components
The priority will be to conserve and protect the biodiversity of the sanctuary. The eco-
development to promote and sustain the livelihood support systems, promotion of eco-
tourism and creating environmental awareness will be the other key areas requiring varied
management efforts to achieve the long-term goal. In order to achieve the above objectives,
activities under following components based on the objectives outlined above are required
to be implemented.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 68
3.2. Kishtwar National Park
Kishtwar National Park lies about 40 km. north-east of Kishtwar town. It is bounded to the
north by the Rinnay River, south by Kibar Nala catchment, east by main divide of great
Himalayas and to the west by Marwa River. The national park encompasses the catchment
of the Kiar, Nanth and Kibar nalas, all of which drain south-west into Marwa River which
joins the Chenab just about Kishtwar town. Based on revised classification of Champion and
Seth (1968), some thirteen vegetation types are represented.
3.3. Wildlife Management and Conservation
Himalayas representing very fragile ecosystems inhabits unique faunal and floral species.
The key stone species sustaining the critical natural food web require appropriate
management strategy and effective implementation of the plan. The tough rugged
mountains with harsh climatic conditions and less working season during the year, makes
the natural resource management more challenging. The management inputs have to be
appropriate so as to allow nature to function within natural parameters. The preference of
key stone species of the catchment area has to be analyzed for habitat manipulation and
management intervention. The following activities are proposed for the management and
conservation of biodiversity of the free draining catchment:
3.3.1. Habitat Improvement:
Pasture improvement and afforestation; Improvement of alpine pastures and planting of
indigenous useful species will be undertaken. Rotational grazing in alpine pastures and
stocking by genetically superior and improved varieties of grass involving stakeholders will
decrease overgrazing and pasture degradation. Alpine grass species like, Poa alpina, P.
versicolor, Chrysopogon echinulatum, Bothrochoea, Agrostis gigantea, Bromus gracillimus,
B. inermis and legumes such as Melilotus alba and Medicago falcata will be taken up for
pasture improvement. Weed control will also be factored in while carrying out pasture
improvement activities. As the area is mostly situated in alpine pasture zone, planting of
useful species i.e. Populus ciliata, Fraxinus xanthoxyloides, Pinus gerardiana, etc. will be
restricted to the lower end along moist portions.
Creation of water resources: Construction of water ponds and check- dams at
appropriate places will help in augmentation of the water regime. Diversion of water to
northern facing slopes and thereby
Soil conservation measures: Himalayas are prone to landslides due to precipitous terrain
and shallow soil depth. Construction of Bio-engineering/ engineering structures to arrest the
soil erosion and land degradation will help in stabilization of the strata. Soil conservation
along steep slopes improves water regime, which is conducive to support vegetation and
thereafter get stabilized.
Strengthening the protection mechanism: Wild populations are to be protected against
poaching for which support in the form of equipment and training will be required. Wildlife
health initiation by inoculating local cattle to minimize the spread of diseases to the wild
population required support.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 69
Soil Stabilization and Bio- engineering works; To arrest soil erosion for improvement of
moisture regime and productivity, construction of bio-engineering /engineering structures on
private land has to be carried out. Check-dams, spurs (preferably vegetative) and check
walls at appropriate places as per requirement will be constructed.
Promotion of Non-Conventional Energy Sources: Energy saving devices like improved
Chullahs/ Solar Cookers, Crematoriums, Solar Lanterns/ Lights, LPG, Gobar Gas Plants,
etc. will be introduced in the villages located within and outside the protected area to reduce
the requirement of fuel-wood and minimise over dependency of villagers on wood. The
activities will be demand driven and location specific.
Support to sustainable mountain livelihoods Himalayas are also referred to as Living Mountain due to high population concentration as
compared to other mountainous regions of the world. However, as the altitude rise and we
approach high Himalayan Ranges the density of population decreases whereas the
dependency on natural resources of the people increases. In this plan following issues will
help in sustaining the livelihoods of the local population.
Livestock and Fodder Improvement: The aim is to improve productive potential through
improvement of fodder, management practices and genetic upgrading of the livestock. It
will also contribute towards restoration of health, vigour and purity of the production
environment. As targeted support to nomadic groups, this subcomponent will include
implementation of Development Plans which are aimed at better flock management,
improved animal health care and promotion of income generating activities for the migratory
glazier’s. Special emphasis will be given on reducing man – animal conflict in the area and
due compensation will be paid to the farmers for loss of human and cattle life and
agriculture produce done by wild animals after identifying mutually agreeable criteria.
Livestock health will be improved by completing existing practices with additional support in
terms of medicines, de-worming, vaccination, veterinary, aid-kits and organizing veterinary
health camps on a regular basis making use of the existing veterinary facilities. Support will
also be provided for activities like nutritive food for rearing young calves by complementing
the existing system in place. Based on the need, support will be provided in terms of
facilities for artificial insemination as well as natural breeding by strengthening the existing
veterinary services already available in the area.
Fodder Production and Community Woodlots: Agro-forestry, silvi-pasture and alpine
pasture development in the degraded land will be encouraged. Mini-Kits will be provided to
facilitate quality fodder and fuel-wood production. Improved planting material of grass and
other local potential fodder crops will be encouraged on the field boundaries. Community
woodlots through panchayats will be created and managed on PFM principles on
community / forest lands. Existing community management practices in the region will be
supported in the natural resource management sector. Innovation in existing forestry and
wildlife management practices will be adopted and promoted. Fodder will be the main focus
in all forestry based plantations to attract the community participation. Stall feeding will be
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 70
encouraged by providing one-time subsidy/ support for (a) renovation of cattle shed (b)
construction of livestock sheds, only for the poorest of the poor and (c) chaff cutters.
Conservation and value addition of fodder will be encouraged through encouraging
practices of hay and silage making and quality will be improved by demonstrating and
encouraging Urea-Molasses treatment of crop residues.
Water Harvesting Structures: Depending on the local potential and suitable terrain, water
resources will be developed for livelihood enhancement in the surrounding of free draining
catchment. Depending on the physiographic and local conditions, the component will
include following indicative activities:
Developing new and improving existing water resources;
Construction of village ponds, tanks, check-dams;
Support and encouragement for roof water harvesting and irrigation;
Efficient use of water by improving conveyance systems, channels and kuhls, sprinkler
and drip irrigation.
The issue of developing new and improving existing water resources gain special
significance in cold areas to promote vegetation to produce soil. The catchment is to be
rehabilitated for recharging the natural water delivery mechanism. Efforts to conserve water
have to be taken well in time as there is no conceivable substitute for such natural services.
Agriculture and Allied Sector: Agriculture and allied activities are the main stay of the
mountain communities’ livelihoods. Strategic investments will be made to create on-farm
based livelihood opportunities and income generation through improved agriculture,
horticulture, forestry, poultry, bee-keeping, livestock and other farm based activities. Based
on local potential and demand, high value crops, aromatic and medicinal plants and
horticulture will be introduced and provision for its grading, processing, storage, branding,
packaging and marketing will be facilitated by the project and will co-finance private sector
entrepreneurs/NGOs (on a one-time subsidy basis). Activities that will be carried out under
this sub-component can be categorized into two focus area; (i) farming systems
development and extension support, and (ii) value addition and marketing.
Support to Farming System and Extension Support: Investments will be made to
enhance farm input services and extension, which includes appropriate technologies
generation and dissemination, provision for improved quality of seeds, integrated pest
management, vermin-composting, soil testing and support for introduction of high value
crops on market demand, medicinal and aromatic crops especially in locations where water
resources are created for supplemental irrigation. Finances from the project will be directed
towards introduction or further development of decentralized, collaborative technology
generation and dissemination activities in villages inside the sanctuary. The mobilization
will ensure greater farmer involvement in planning and implementation of extension and
adaptive programs. The implementation of this sub-component will tactically depend on the
nature of collaboration between the project and other line departments responsible for
agriculture and allied sectors; and public-private partnership with private sector and NGO
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 71
service providers. Introduction of innovative agricultural, livestock and poultry production
systems would be actively promoted.
Demonstration, field days, exposure visits, mass-media, development of local resource
persons and master trainers and wherever feasible information technology will be used as
extension tools. The precise nature of demonstrations, training programme and other
interventions will be detailed out in the project implementation plan. Substantial capacity
building and training of extension staff of line departments and farmers would be undertaken
to employer producers and link them with multi sources of information and markets.
Value Addition and Farming: Value addition and marketing is critical for ensuring
sustainable economic growth in the mountains. Providing private entrepreneurs with an
enabling environment, efforts will have made to create a congenial environment for
promoting private entities. Finances (on a one-time subsidy basis) will be made available to
assist potential entrepreneurs to establish sustainable backward linkages with producers
and producer groups, identify business opportunities, identify domestic and export markets
through market surveys, trade fairs, etc. prepare marketing and business plans, and also
access investment funds from GOI sponsored schemes and commercial banks. Basically,
the value-addition element will cover investment on product diversification, processing,
grading storage, packaging, branding, credit linkages and marketing.
3.4. Rural Infrastructure and Community Development
Infrastructure development; This sub-component covers construction of footpaths and
small bridges to improve the accessibility to market and other public institutions for small
and isolated habitations where conventional road construction is not feasible either due to
topographical or economic considerations. It will also contribute towards improvement in
the availability of potable water and rural health and sanitation. Public Health Centers and
Aganwadis will be strengthened.
The project will prepare plans showing paths, footbridges, and culverts required and
indicating how these provide access to each habitation to nearby roads or market centers.
These plans would be prepared in such a way that they complement the existing master
plans for rural roads prepared under the Prime Minister Gram Sadak Yojna (PMGSY). The
traditional bridle paths, existing in many areas, will also be included in the plans. These
plans will be finalized in consultation with the Panchayats and local communities. The
component will also include construction of ropeways in identified areas to transport
agriculture produce or other goods from the area of production to nearby roads (for onward
transport to the marketing centers).
Several of the roads in the project area require slope treatment and other improvements to
check soil erosion and environmental degradation. Soil conservation activities on the rural
infrastructure should be undertaken so that the main dam, roads as well as environment
could be saved from further degradation. Use of appropriate plantation and drainage
improvement would be promoted for this purpose. Ridge to valley approach will be adopted
for catchment treatment.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 72
Community development; Local institutions like, Panchayats, Self Help Groups, Yuvak
and Mahila Mandals will be strengthened. Exposure and study tours of local groups to
places and institutions, which demonstrate innovative ideas/ models to improve their living
standards, will be planned. This will widen their knowledge and enhance their understanding
of natural resources resulting in developing site specific solutions to sustain mountain
livelihood and retain cultural heritage.
3.5. Eco-Tourism and Environmental Awareness
Eco-tourism; Himalayas are well known for trekking and mountain expeditions. Sighting of
wildlife species i.e. as Blue-Sheep and Ibex along well defined trails inside the sanctuary
can boost the tourism in the area. Local youths can get employment by acting as local
Guides. Organizing trekking expeditions is another field having good adventure tourism
potential. Local youth will be imparted training in this field in places which are well-
developed having expertise in similar areas, like Leh (Jammu & Kashmir).
Environment Awareness Centre: Environmental Awareness Centre is proposed to be
established at appropriate place, preferably at district Headquarters, which is not far off from
the sanctuary, for general environmental awareness. With children as target group, centre
will act as knowledge center about environmental values. This will inculcate the sense of
belongingness among them helping in environmental protection and understanding the
biodiversity richness of the Himalayas. The centre will also develop publicity material;
organize environmental awareness meetings and workshops.
3.6. Capacity Building and Skill-Up Gradation
For quality management inputs, the capacity of the field staff deployed will be enhanced
with appropriate training inputs in relevant fields at regular intervals.
Exposure visits and on field study tours to the well managed protected areas like Kishtwar
National Park, High Altitude Hemis National Park in Ladakh and high altitude well managed
sanctuaries will be organized. Besides training in wildlife management field staff will also be
sent to human and social development management courses.
3.7. Research and Monitoring
As is well known that Himalayan biodiversity is not well studied at present. Research
parameters are to be prioritized to study the habitat preferences of the species found in the
sanctuary and accordingly devise and apply the management practices in the sanctuary.
Research and monitoring is an important part of natural resource management. It has
become more significant today as more species are being added to the endangered list. A
mechanism to monitor and evaluate the objectives proposed under the plan will be
established in the beginning for effective implementation. Monitoring wildlife population
trends, non-timber forest produce shall be taken up on priority. Research will also be
required to uplift the socioeconomic condition of the local population for harmony between
man and nature. An Implementation and monitoring committee is proposed to be constituted
for implementation, monitoring and evaluation of the project components under the
chairmanship of the divisional Forest Officer, wildlife Division Kishtwar. The committee shall
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 73
have local Panchayat Pradhan, two reputed NGOs, representatives of Mahila Mandals and
Youth clubs as members. The committee will meet once in each quarter in the sanctuary
area.
FINANCIAL ALLOCATION
The comprehensive biodiversity management plan requires a detailed biological diversity
assessment in the project area and in the downstream. The financial allocation is based on
the identified components under the plan. However, an amount of Rs. 110 lac has been
proposed, the break-up of which is shown in Table 3.1.
Table 3.1 : Financial Abstract for Activities under the plan
Sr. No.
Item Amount (Rs. Lac)
1 Awareness program for protection of Wildlife 15.00
2 Wildlife survey & research
a) Survey of wildlife & wildlife habitats 13.00
b) Survey for sensitive / unique wildlife habitats area
in the project
3.00
3 Development of habitat improvement measures in the degraded areas of the impact area d/s of barrage
a) Normal Plantation 8.00
b) Enrichment Plantation 30.00
c) Infrastructure/Vehicle support & rescue operation facility to watch the wildlife*
12.00
d) Construction of Watch Towers & drinking water ponds for wildlife
10.00
4 Linking community development with Wild Life conservation a) Providing pressure cooker / Gas connection / solar cooker/ Lantern /Water heating devices (Hammam) to 15 household for IRDP and assess their response and acceptance
5.00
b) The micro credit schemes in the area may be effective tool e.g. organic farming, education of girl child. Training to school teachers, use of LPG in place of fuel wood, Vermicompost etc.
4.00
c) Support to SHG,s to increase their income level. There may be a need for capacity building of staff and community for this purpose
5.00
d) Vaccination and Medical facilities to domestic cattle 5.00
Total 110.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 74
4. FISHERIES MANAGEMENT PLAN
4.1. Introduction
The construction of a dam on a river blocks or delay in the upstream fish migration
and contribute to the decline or even the extinction of species that depend on
longitudinal movements along the stream. Fish populations are highly dependent
upon the characteristics of their aquatic habitat, which supports all their biological
functions. Considering the migration of potamodromous fishes- whose entire life
cycle is completed within the inland waters requires different environments for
reproduction (Northcote, 1998). Possible fish passage/fish ladder/fish bypass to
provide migratory passage have been assessed to evolve effective conservation
strategies for sustainable management of aquatic biodiversity. However, these
passages have been found more effective in low head barrage/dam but for high
dams passage are not found viable due to immediate loss of habitats. In case of high
dams the development of fish lift has been tried in some instances. The Operation of
fish lift is not techno-economically feasible considering the low density of migratory
fishes at the project site.
In case of high dams, when there is numerous variability in terms of physical
environment as drastic changes to the habitat upstream or downstream due to
changes in water flow and water quality, and poorly-known fish species behavior,
their swimming abilities, migratory patter, population size and predation etc. are
limiting the significance of fish ways / passage. The other best option which has been
visualized for the present proposed project is captive culture through artificial
propagation of endemic and exotic snow trouts and restoration of remaining free flow
regime Bhut nalla which confluences with Chenab about 16 km u/s of the proposed
dam of Kirthai-II HEP.
The endemic fish snow trout-Schizothorax sp is under threat as blockage of
migratory routes due to cascade development of hydroelectric power projects such
as Salal, Swalikot, Baghliar and Dul-Hasti Hydroelectric projects. That clearly shows
the impact of blockage of river in downstream area as snow trout fish was earlier
present in the region supported by the secondary data. These projects have
impacted on aquatic ecology and fishery of river Chenab in the available free flow
water regime as no provision made for fish migration from downstream to upstream.
4.2. River Chenab Morphology and Habitat Structures
The river Chenab has torrent water flow (3-4 m sec-1) with frequent rapids and
cascade habitats, and few ever pools and runs in some places (Photo). The river
banks showed pocket pools, riffles and shallow water sites which are restricted to
bank sides. The substratum of river is dominated with small to large boulders and
rocks impregnated with fine sand. Cobbles and gravels were observed in lesser
amount. The side banks and flood prone area were predominated with large
boulders impregnated in sand and stable rock hill slopes with sparse vegetation. The
river banks and hill slopes showed sparse and thin vegetation in patches which is
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 75
dominated with trees as Cedrous sp. & Alanus spp. mainly followed by few ever
herbs and shrubs.
The morphology of the streams is different due to first order and receives glacial /
snowmelt water. Streams showed very high gradient or slope >10%, with large
boulders and rocky substratum. Cascades and falls form dominant habitat, leading to
formation of scour and step pools. The stream bed and banks are predominated with
rocks and boulder some places impregnated in sand.
The side hills of the project site experiences heavy snow fall during every winter. The
temperature, flow rate and volume of water decreases during winter. The river
discharge increases during April to September due to melting of snow. However, the
area has lesser rainfall or located in rain shadow zone with wet temperate climate.
The temperature of the river was observed during study period was ranged between
4.50C to 6.50 C, clearly indicating cold water flowing zone which supports the trout
fishery though distribution of endemic fishery is not significant in this region. The
presence of trout in river Chandra and Bhaga in uplands of Lahul & Spiti area is due
to its introduction by the Fisheries Department of state of Himachal Pradesh.
However no endemic and exotic trout was found present during study period in the
influential area of the proposed project. The rainbow trout is reared and cultured at
Mugal Maidan state trout hatchery near Chitoor, district Doda is being introduced
upstream and downstream area of Dul-Hasti project.
4.2.1. Anticipated Impact
The natural processes of fish congregation for breeding, development of fries and
fingerlings and the migration of the fishes would be completely affected due to the
construction of the dam (121 m high from river bed level). Almost all fish species will
find a barrier for their upstream migration with the construction of dam and river
resulting in massive failure of recruitment of the stock above the dam. With the
construction of proposed Kiru HEP Downstream the d/s migration will also be
hampered for migratory fish species, which will affect their spawning and feeding.
The only redeemable feature is the existence of free flowing Bhut Nalla which
confluences with Chenab about 16km u/s of the proposed dam of Kirthai-II HEP. For
migratory fishes, Bhut Nalla (Figure 4.1) shall provide a good flow regime for trout
propagation and declared as trout stream for future conservation and restoration.
Figure 4.1 : Bhut Nalla near Village Matti and confluence with the Chenab river
Chenab
Bhut Nala
Bhut Nala
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 76
4.2.2. Minimum Environmental Flow Requirement
The minimum stipulated flow for leanest month (December - March), which includes
the breeding period/spawning movement (December and March), has been worked
out on the basis of 20% of average flow in four consecutive leanest months i.e. from
December to March in 90% dependable year which is year 2000-01 for diversion
site. The computation of minimum flow requirement works out to 7.81 cumec, against
this minimum requirement, ecological flow release of 11.0 cumec through auxiliary
power house. During non-leanest and non-monsoon months of October, November,
April and May, which includes the breeding period/spawning movement (November -
March - April) has been worked out as 24.71 cumec and shall be partly made
through the auxiliary power house and TRT. During monsoon months (June-
September), has been worked out on the basis of 30% of the 10-daily flow of the
concerned period and shall be made available through the spillway.
4.2.3. Conservation
Development of fish ladder is not feasible in Kirthai-II HEP due to technical
constrains (Height of the dam). The alternative ways are development of fish lift and
development of fish hatchery. The former is not techno-economically feasible
considering the low density of migratory fishes and the best alternative is
development of a hatchery at the project site. Artificial hatching of fingerlings and
continuous restocking in the river and the reservoir is the best possible option to
sustain riverine fishery.
4.3. Fish Hatchery Development
Considering the importance of cold water fisheries, there is need to conserve the
Chenab River within the project area upstream and downstream to convert into a
trout stream through development of Trout Rearing Unit.
To breed and culture riverine fishes in controlled conditions, a fish hatchery is
proposed by the State Fishery Department. The Directorate of Fisheries,
Government of J&K, would manage the development of fish hatchery. Initially the
project authorities would provide the funds for the establishment and maintenance of
fish seed farm. Thereafter, it is assumed that the established facility would be taken
over by the Directorate of Fisheries, Government of J&K. It is assumed that the
project would be taken over by the Directorate of Fisheries, Government of J&K and
run interpedently.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 77
Figure 4.2 : Honser Stream near Kejai village
To maintain the fish biomass of water body by way of augmentation with fish seed
production of viable and commercially important species of fish, the development of
multidimensional fish farming project has been proposed where in the commercially
important species of fish existing in the area like Schizothorax, Mahseers and Carps
can be produced and reared for augmentation of the affected main river and its
tributaries/hill torrents by way of:
Rehabilitation of important fish fauna and affected species of fish especially
Schizothorax, Mahseer and Trout, the existing species of the river.
To raise the fish seed in the farm for stocking in natural water bodies affected to
compensate the possible loss caused by construction of various concrete
structures.
Establishment of fish farm where economically important species of fish are likely
to be reared, produced under the supervision of Fisheries experts.
To boost the fish farming in the private sector and to compensate the loss
occurring to the people dislodged and people who are involved in the fishery
trade because of construction of power projects.
To generate employment for the affected people as well other inhabitants of the
area by keeping seed of variety of fish available in the farm to help and
encourage them to earn their livelihood by taking fish farming as profession
(either part time or full time).
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 78
To keep quality fish available.
A project has been designed with the cooperation of J&K State Fisheries Department
which inter-alia encompasses the following components:
Land Acquisition: For establishing of the Hatchery unit about 10 Kanals (0.5 ha)
land has been identified in Kijai Village near the left bank of Honsar Nala.
Water Intake Channel: In order to cater to regular discharge to all raceways /
ponds, the water shall be taped from a perineal stream (Honsar Nalla) through
inlet channel of 18-inch internal diameter MS pipes to rapid filtration plant.
Thereafter supply shall be continued through cement concrete surface channel.
Desilting Chamber /Rapid Filtration Plant: The silt load of the inflowing
discharge can cause mortality by way of choking the gills of the fishes. Therefore,
construction of rapid filtration plant with walls and floor of either concrete or stone
masonry shall be undertaken.
American Type Raceways: Ten pairs of American type raceways (66 ft X 15 ft
X 4.5 ft) shall be constructed for rearing of the trout fingerlings. The walls and
floor of the raceways shall be constructed with M-20 grade reinforced cement
concrete (RCC). The raceway shall be provided with inlet and outlet channel.
Open Raceways: In order to rear the fish seed in bulk, so as to cater the
demand and to raise the brood stock efficiently, construction of four open
raceways is conceived. The walls and floor of the raceways shall be constructed
with M-20 grade reinforced cement concrete (RCC). The raceway shall be
provided with inlet and outlet channel.
Feed Store: In order to provide sufficient quantity of quality fish, feed to fishes
being reared, abundant quantity of feed needs to be stored within the pump
premises. For this a single storey hall type building with rolling shutter is
proposed.
Hatchery Unit: it is proposed to construct a hatchery unit within the farm
premises to produce quality fish seed / fingerlings. The hatchery shall have
separated breeding as well as preliminary nursery chamber with efficient
chamber of water supply.
Farm House and Guard Huts: For day to day administration, monitoring and
running of the fish farm an office complex with two rooms, one store and one
bathroom is proposed. To ensure efficient vision around the clock, guard house
(Single Storey Hut) having three rooms, one store / kitchen and one bathroom
will be constructed.
Laboratory Block: It is proposed to construct a laboratory block equipped with
modern equipments and material for monitoring important physico-chemical
parameters vital for efficient growth of fish.
Fish Landing: For development of the proposed reservoir fisheries a fish land
centre shall be required to be developed. Provision of clean and sanitary building
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 79
with ancillary facilities like portable water, ice, fly proofing arrangement and chill
storage at fishing harbours is an essential requirement to maintain quality and
safety requirement for the landed fish.
Motorboats: For control and management of reservoir fisheries, the requirement
of one motor boat for patrolling and other for rescue operation is essential.
Farm equipment/ Fishing Net / Life Saving Jacket: For execution of different
activities, different types of farm equipment nets like fishing net / shade net, dam
boards, screen trucks, trays and other accessories are required.
To ensure high productivity of fish from the initial stage of filing, obtaining a sustainable
yield of fish from the reservoir, to avoid wasting of fishery resources and also for
conserving the fish stocks, various rules and regulations under the Fisheries Act of the
J&K State are to be followed. The following recommendations are made for the
reservoir fisheries development.
I. Stringent measures are to be adopted on the size of the mesh of the fishing net
to be used and the fish to be caught to prevent the indiscriminate fishing in the
river. Fishing shall be done as per the norms of the Directorate of Fisheries,
Government of J&K.
II. Fishing should be prohibited during the breeding as well as stocking seasons.
III. In order to obtain the huge stocks of the fries of desirable fish, fishing should be
banned two years prior to filling and during the first year of reservoir formation.
IV. In order to ensure optimum fish diversity and density in the area of reservoir, it
is suggested that various tributaries of river Chenab viz. Kabban Nallah, Khoral
Nallah, Dudheri Nallah, Bhut Nallah, Honsar Nallah, Aphani Nallah, Lidder
nallah, Kulheg nallah, Kidur nallah, Kijai nallah etc. in the area should be
managed to ensure fish migration from river Chenab to these tributaries for
breeding and feeding and back to the main river.
V. Stocking of Tor tor and Tor putitora in the reservoir: Main reservoir can be
stocked with various species of Mahseer, which can migrate in the streams for
breeding and feeding. Even larvae and adult of Schizothoracinae from other
places can be introduced in the reservoir and various tributaries joining the
reservoir and upstream of river at various places.
VI. Hatchery should be used only to breed and culture various riverine fishes of
Schizothorax, Schizothorichthyes, Garra and Tor species.
VII. Exotic species like Cyprinus carpio and Hypophthalunichthyes molitrix should
not be introduced at any stage as these have harmful effects on local fishes.
4.4. Cost Estimate for Hatchery Development
The Joint Director Fisheries Projects, Narwal, Jammu Division vide letter no.
JDF/P/2015/-16/990-93 dated 31-10-2015, has formulated a plan for development of
fisheries in the reservoir of Kirthai-I HEP, with an outlay of Rs. 720 lakh, as detailed in
Table 4.1.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 80
Table 4.1 : Abstract of Cost for Development of Trout Hatchery
S.
No.
Particular Quantity Units Rate
(Rs.
Lakh)
Total
Amount
(Rs. Lakh)
1 Acquisition of land and its development 10 Kanals 5.00 50.00
2 Construction of American type of Raceways 15 No. 10 150
3 Construction of Open Raceways 10 No. 4.00 40.00
4 Construction of Ponds 4 No. 12.00 48.00
5 Construction of Farm House 01 No. 40.00 40.00
6 Construction of Watch Hut 2 No. 30.00 60.00
7 Construction of Water Intake Channel 1 No. L.S. 30.00
8 Construction of Desilting Chamber / Rapid
Filtration Plant
1 No. L.S. 60.00
9 Construction of Feed Store 1 No. LS 10.00
10 Construction of Laboratory and Cost of Equipment 1 Job LS 40.00
11 Construction of Hatchery House and Provision of
equipments
1 Job LS 70.00
12 Purchase of Vehicles for transportation of seed
alongwith requisite gadgets.
1 Job LS 20.00
13 Development of fish landing center 5 No. 2.00 10.00
14 Motorboat with accessories for patrolling and one
rescue boat including allied taxes
2 No. 20.00 40.00
15 Farm Equipments/Fishing nets / Life Saving
Jackets etc.
1 Job LS 15.00
16 Development of Internal path and arboriculture 1 Job LS 40.00
17 Survey/Research and investigation including
eqipments/training /Awareness/Orientation etc.
1 Job LS 10.00
18 Extension Activities including purchase and
transportation of Fish Seed/Feed
1 Job LS 20.00
19 Administration Charges/Exigencies Office
Expenses/TA/POL/contingencies/consultancy/need
base expenses/cost of feed/chemicals and other
Misc charges.
1 Job LS 15.00
20 Fish Sale Outlet 1 Job LS 10.00
21 Installation / Provision of Power Supply 1 Job LS 10.00
Total 760.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 81
5. RESETTLEMENT AND REHABILITATION PLAN
5.1. Introduction
Like any other development / infrastructure project for the public purpose land (Public
and Private) invariably is to be acquired by the appropriate government either for its
own use or for a requiring body as the case may be. The total private land required
for the project is 43 ha which is spread over 7 villages in Paddar block of district
Kishtwar, J & K. Though the project has been conceived with the sole objective of
minimal displacement of people because their property in the project affected area,
the compulsory acquisition of land for public purpose has been necessitated.
5.2. Social Impact Assessment Studies
The Socio-economic survey of the project affected village (PAV) and project affected
Families (PAF) in the form of household survey was undertaken for gathering
baseline information on various socio-economic parameters which included the
following:
a. assessment as to whether the proposed acquisition serves public purpose.
b. estimation of project affected families including families likely to be displaced.
c. Extent of land (Public / Private), houses and other assets, to be affected by the
acquisition.
d. Feasibility of Acquisition at an alternative place.
e. Assessment of bare minimum extent of land needed for the project.
f. Study of social impact and mitigate cost in addressing these and its ramification
on the overall cost of the project vis-à-vis the benefits of the project.
5.2.1. Public Purpose
In the wake of the fact that the land to be acquired is within the territory of J&K State,
the State Government of J&K is the Appropriate Government intends to acquire the
land for construction of the infrastructure projects, in the preset case Kirthai – II HEP
(930 MW), essentially an energy generation project included in the Annexure-I of the
Notification of the Govt. of India, Department of Economic Affairs (Infrastructure
Section) No. 13/6/2009-INF dated 27 march 2012 and even no. amendment dated 1st
April 2013. Thus, the provisions of “The Right to Fair Compensation and
Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013”
applies in respect of all activities related to land acquisition for the project.
5.2.2. Village-wise Project Affected Families
The village-wise details of project affected families and total private land to be
acquired in the village is shown in Table 5.1. It is evident that there shall be 446
affected families (whose land or immovable property shall be acquired) of which
there shall be 5 displaced families (who on account of acquisition of land has to be
re-located and resettled from the affected area to the resettlement area).
Table 5.1 : Village-wise details of PAF
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 82
S. No. Name of Village Private Land (ha) No. of PAF
1 Layee 12.14 91
2 Kundal 15.12 177
3 Mati 1.69 33
4 Gulabgarh 7.00 31
5 Laddar 5.10 82
6 Atholi 1.39 30
7 Affani 0.56 2
Total 43.00 446
5.2.3. Extent of land (Public / Private), houses and other assets, to be affected by the
acquisition
For execution of the project 225.25 ha land, falling in Tehsil Paddar of District
Kishtwar, shall be required of which the apportionment between State, Private and
Reserved forest land shall be 40.00 ha, 43.00 ha, 142.25 ha respectively, Besides
the private land residential/non-residential houses, shops and cattle shed shall be
also acquired, the details of which is yet to be provided by the project proponent.
Besides this diversion of 142.25 ha forest land shall be involved. The village-wise
details of PAF is given in Table 5.2.
Table 5.2 : Village-wise details of PAF
S. No. Name of Village Private Land (ha) No. of PAF Houses Kothas (N.R.)
1 Layee 12.14 91 0 17
2 Kundal 15.12 177 3 21
3 Mati 1.69 33 0 5
4 Gulabgarh 7.00 31 0 8
5 Laddar 5.10 82 0 6
6 Atholi 1.39 30 0 1
7 Affani 0.56 2 0 1
Total 43.00 446 3 59
5.2.4. Feasibility of Acquisition at an alternative place.
Kirthai - II Hydro-Electric Project has been conceived as R-O-R scheme across river
Chenab in district Kishtwar. The proposed 165 m high dam (from deepest foundation
level) on the Chenab shall be located near Kidur about 16.5 km d/s of Gulabgarh at
longitude 760 4’ 37” E and latitude 330 18’ 41” N. One no. head race tunnel of 11.25m
diameter and 4.289km long shall be aligned on the left bank from intake structure
and 1 no. intake for auxiliary power house (90 MW) shall be located at the right bank.
The underground power house (140 X 6) shall be located on left bank of the Chenab
near ladrari nala neasr Raothak Khola.
The siting and alignment of the project components like diversion structure, intake
structure, underground conductor system and power house etc. is mainly based on
the geological condition of the rocks. During investigation and planning stage and
also at the time of preparation of DPR, detailed surface and sub-surface
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 83
investigations are carried out at different alternative sites and balance is struck in
favor of the best alternative.
The site, about 1 km d/s of the above site and 250 m u/s of Kidur Nallah is suitable
for a concrete dam as no suitable location is possible for locating a Chute /Side
Channel spillway. At the site the river gorge is deep and narrow and granitic genesis
is exposed on both banks. The diversion tunnel can be in the right bank and the
spillway can be in the middle portion of the concrete dam. The length of the power
tunnel, to be located on left bank, would be around 4.29 km..
Thus, it is abundantly clear that the proposed project is site specific. Thus it is clear
that land acquisition at any other alternative place for locating the project
components is not plausible by any stretch of imagination. The locations of quarry
and muck disposal site have also been considered in view of techno-economical
consideration. All the muck designated sites are near to the work components as
well as avoiding private land to the best possible extent. The rock-in-situ quarry sites
are mostly in forest land obviating private land. It is thus manifest that feasibility of
land acquisition at any other alternate site is not feasible in the least.
5.2.5. Assessment of bare minimum extent of land needed for the project.
The land requirement for various components of the project i.e. dam, intake structure
and underground works have been in sync with the dimensions determined on the
basis of detailed hydraulic as well as structural design. The land required for various
components of dam and spillway to pass the design flood discharge is based on as
per standard designed practices, IS:6966(Part-I). likewise, the tunnel diameter has
been finalized on the basis of economical diameter. The dimensions of penstocks,
power house, draft tube and TRT has been fixed on the basis of detailed design.
Some quantity of the muck generated has been proposed for consumptive use for
construction material thereby implying minimization of land required for muck
disposal site as well as quarry sites. Thus, to keep the land requirement to the
minimum, an all-out effort has been made.
5.3. Resettlement & Rehabilitation Principles
On the basis of the primary and secondary data collected in respect of the project
affected families a draft R & R Plan has been formulated in consonance with the
principles enunciated in “The Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013”, which has come into force
from 1-1-2014, notified by Government of India. Besides this meeting the mandatory
requirement, certain works relating to social welfare and community development are
also considered in consultation with local authorities and representatives of affected
families to make the R&R Plan for the proposed project so that a greater degree of
acceptability for implementation of the plan is achieved.
5.3.1. Definitions Followed in the Present R & R Plan
For this project, procedure and compensation will be as per the RFCT_LARR 2013
and following key definitions will be followed:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 84
(a) "Administrator" means an officer appointed for the purpose of rehabilitation
and resettlement of affected families under sub-section (l) of section 43;
(b) "affected area" means such area as may be notified by the appropriate
Government for the purposes of land acquisition; (c) 'affected family"
includes-
(i) a family whose land or other immovable property has been acquired;
(ii) a family which does not own any land but a member or members of such
family may be agricultural labourers, tenants including any form of tenancy
or holding of usufruct right, share-croppers or artisans or who may be
working in the affected area for three years prior to the acquisition of the
land, whose primary source of livelihood stand affected by the acquisition
of land;
(iii) the Scheduled Tribes and other traditional forest dwellers who have lost
any of their forest rights recognized under the Scheduled Tribes and Other
Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 due to
acquisition of land;
(iv) family whose primary source of livelihood for three years prior to the
acquisition of the land is dependent on forests or water bodies and
includes gatherers of forest produce, hunters, fisher folk and boatmen and
such livelihood is affected due to acquisition of land;
(v) a member of the family who has been assigned land by the State
Government or the Central Government under any of its schemes and
such land is under acquisition;
(vi) a family residing on any land in the urban areas for preceding three years
or more prior to the acquisition of the land or whose primary source of
livelihood for three years prior to the acquisition of the land is affected by
the acquisition of such land;
(d) "agricultural land" means land used for the purpose of--
(i) agriculture or horticulture;
(ii) dairy farming, poultry farming, pisciculture, sericulture, seed farming
breeding of livestock or nursery g rowing medicinal herbs;
(iii) raising of crops, trees, grass or garden produce; and
(iv) land used for the grazing of cattle;
(e) "appropriate Government" means, -
(i) in relation to acquisition of land situated within the territory of, a State, the
State Government:
(ii) in relation to acquisition of land situated within a Union territory (except
Puducherry), the Central Government;
(iii) in relation to acquisition of land situated within the Union territory of
Puducherry, the Government of Union territory of Puducherry;
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 85
(iv) in relation to acquisition of land for public purpose in more than one State,
the Central Government, in consultation with the concerned State
Governments or Union territories; and
(v) in relation to the acquisition of land for the purpose of the Union as may be
specified by notification, the Central Government:
Provided that in respect of a public purpose in a District for an area not
exceeding such as may be notified by the appropriate Government, the
Collector of such District shall be deemed to be the appropriate
Government;
(f) "Authority" means the Land Acquisition and Rehabilitation and Resettlement
Authority established under section 5l;
(g) "Collector" means the Collector of a revenue district, and includes a Deputy
Commissioner and any officer specially designated by the appropriate
Government to perform the functions of a Collector under this Act;
(h) "Commissioner'' means the Commissioner for Rehabilitation and Resettlement
appointed under sub-section (l) of section 44;
(i) "cost of acquisition" includes-
(i) amount of compensation which includes solatium, any enhanced
compensation ordered by the Land Acquisition and Rehabilitation and
Resettlement Authority or the Court and interest payable thereon and any
other amount determined as payable to the affected families by such
Authority or Court;
(ii) demurrage to be paid for damages caused lo the land and standing crops
in the process of acquisition;
(iii) cost of acquisition of land and building for settlement of displaced or
adversely affected families;
(iv) cost of development of infrastructure and amenities at the resettlement
areas;
(v) cost of rehabilitation and resettlement as determined in accordance with
the provisions of this Act:
(vi) administrative cost, -
(A) for acquisition of land, including both in the project site and out of
project area lands, not exceeding such percentage of the cost of
compensation as may be specified by the appropriate Government;
(B) for rehabilitation and resettlement of the owners of the land and
other affected families whose land has been acquired or proposed
to be acquired or other families affected by such acquisition;
(vii) cost of undertaking 'Social impact Assessment study'; (j) "company"
means-
(i) a company as defined in section 3 of the Companies Act, 1956. Other
than a Government company:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 86
(ii) a society registered under the Societies Registration Act, 1860 or under
any corresponding law for the time being in force in a State;
(k) "displaced family" means any family, who on account of acquisition of land has to
be relocated and resettled from the affected area to the resettlement area;
(l) "entitled to act" in relation to a person, shall be deemed to include the following
persons, namely:
(i) trustees for other persons beneficially interested with reference to any
such case, and that to the same extent as the person beneficially
interested could have acted if free from disability;
(ii) the guardians of minors and the committees or managers of lunatics to
the same extent as the minors, lunatics or other persons of unsound
mind themselves, if free from disability, could have acted:
Provided that the provisions of Order X XX II of the First Schedule to the
Code of Civil Procedure,
I908 shall, mutatis mutandis, apply in the case of persons interested
appearing before a Collector or Authority by a next friend, or by a guardian
for the case, in proceedings under this Act:
(m) "family" includes a person, his or her spouse, minor children, minor brothers and
minor sisters dependent on him:
Provided that widows. divorcees and women deserted by families shall be
considered separate families:
Explanation. -An adult of either gender with or without spouse or children or
dependents shall be considered as a separate fam ily for the purposes of this
Act.
(n) "holding of land" means the total land held by a person as an owner, occupant or
tenant or otherwise;
(o) "infrastructure project" shall include any one or more of the items specified in
clause (b) of subsection ( /) of section 2;
(p) "land" includes benefits to arise out of land, and things attached to the earth or
permanently fastened to anything attached to the earth:
(q) "landless" means such persons or class of persons who may be, -
(i) considered or specified as such under any State law for the time being in
force; or
(ii) in a case of landless not being specified under sub-clause (i), as may be
specified by the appropriate Government;
(r) "land owner" includes any person, -
(i) whose name is recorded as the owner of the land or building or part
thereof, in the records of the authority concerned; or
(ii) any person who is granted forest rights under the Scheduled Tribes and
Other Traditional Forest Dwellers (Recognition of Forest Rights) Act,
2006 or under any other law for the time being in force; or
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 87
(iii) who is entitled to be granted Patta rights on the land under any law of
the State including assigned lands: or
(iv) any person who has been declared as such by an order of the court or
Authority;
(s) "local authority" includes a town planning authority (by whatever name called) set
up under any Law for the time being in force, a Panchayat as defined in article
243 and a Municipality as defined in article 243P, of the Constitution;
(t) "marginal farmer" means a cultivator with an un-irrigated land holding up to one
hectare or irrigated land holding up to one-half hectare;
(u) "market value" means the value of land determined in accordance with section 26;
(v) "notification" means a notification published in the Gazette of lndia or, as the case
may be, the Gazette of a State and the expression "notify" shall be construed
accordingly;
(w) "patta" shall have the same meaning as assigned to it in the relevant Central or
Slate Acts or rules or regulations made thereunder; (x) "person interested"
means-
(i) all persons claiming an interest in compensation to be made on account
of the acquisition of land under this Act;
(ii) the Scheduled Tribes and other traditional forest dwellers, who have lost
any forest rights recognized under the Scheduled Tribes and Other
Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006;
(iii) a person interested in an easement affecting the land;
(iv) persons having tenancy rights under the relevant State laws including
share-croppers by whatever name they may be called; and
(v) any person whose primary source of livelihood is likely to be adversely
affected;
(y) "prescribed" means prescribed by rules made under this Act;
(z) "project" means a project for which land is being acquired, irrespective of the
number of persons affected;
(za) "public purpose" means the activities specified under sub-section (l) of
section 2;
(zb) "Requiring Body" means a company, a body corporate, an institution, or any
other organization or person for whom land is to be acquired by the
appropriate Government, and includes the appropriate Government, if the
acquisition of land is for such Government either for its own use or for
subsequent transfer of such land is for public purpose to a company, body
corporate, an institution, or any other organization, as the case may be,
under lease, license or through any other mode of transfer of land;
(zc) "Resettlement Area" means an area where the affected families who have
been displaced as a result of land acquisition are resettled by the
appropriate Government;
(zd) “Scheduled Areas, means the Scheduled Areas as defined in section 2 of the
Provisions of the Panchayats (Extension to the Scheduled Areas) Act, 1996;
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 88
(ze) “small farmer” means a cultivator with an un-irrigated land holding up to two
hectares or with an
(i) irrigated land holding up to one hectare, but more than the holding of a
marginal farmer.
5.4. Compensation for Land Owners
The project proponent, has neither yet acquired the land by negotiation nor initiated any land
acquisition process for private land and not even issued prelimnary notification under
Section-4 of the State J & K Land Acquisition Act, 1990 (1934 A.D). In case the State
Government notify to adopt the RFCTLARRA, 2013 then award under section 11 of the said
Land Acquisition Act shall be made. All provisions of the RFCTLARRA, 2013 related to the
determination of compensation shall apply. The project proponent shall have to move to the
appropriate government along with the details for the land to be acquired for causing
publication of preliminary notification as warranted under Chapter 4 (Section 11) of the Act.
After hearing of the objection under Section 15. The administrator for Rehabilitation and
Resettlement shall prepare a draft Rehabilitation & Resettlement Scheme for the review of
the Commissioner Rehabilitation.
The market value of land shall be determined by the Collector on the basis of the following
criteria:
a. The market value, if any, specified in the India Stamp Act, 1899 (2 of 1899)
for the registration of sale deeds or agreements to sell as the case may be, in
the area, where the land is situated; or
b. The average sale price for similar type of land situated in the nearest village
or nearest vicinity area; or
c. Consented amount of compensation as agreed upon under sub-section (2) of
section 2 in case of acquisition of lands for private companies or for public
private partnership projects.
whichever is higher:
Provided that the date of determination of market value shall be the date on which the
notification has been issued under section 11.
(2) the market value shall be calculated as per above shall be multiplied by a factor to be
specified in first schedule.
The First Schedule
[See section 31(2)]
The following components shall constitute the minimum compensation package to be given
to those whose land is acquired and to tenants referred to in clause (c) of Section 3 in a
proportion to be decided by the appropriate Government.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 89
S.
No.
Component of
compensation package in
respect of land acquired
under the Act
Manner of determination of value
1 Market value of land To be determined as provided under section 26.
2
Factor by which the market
value is to be multiplied in
the case of rural areas
1.00 (one) to 2.00 (Two) based on the distance of
project from urban area, as may be notified by the
appropriate Government
3
Factor by which the market
value is to be multiplied in
the case of urban areas
1 (One)
4 Value of assets attached to
land or building To be determined as provided under section 29
5 Solatium
Equivalent to one hundred per cent of the market value
of land mentioned against serial number 1 multiplied by
the factor specified against serial number 2 for rural
areas pot serial number 3 for urban areas plus value of
assets attached to land or building against serial
number 4 under column (2)
6 Final award in rural areas
Market value of land mentioned against serial number 1
multiplied by the factor specified against serial number 2
plus value of assets attached to land or building
mentioned against serial number 4 under column (2)
plus solatium mentioned against serial number 5 under
column (2).
7 Final award in urban areas
Market value of land mentioned against serial number 1
multiplied by the factor specified against serial number 3
plus value of assets attached to land or building
mentioned against serial number 4 under column (2)
plus solatium mentioned against serial number 5 under
column (2).
8 Other component, if any, to
be included
5.5. Elements of Rehabilitation and Resettlement Entitlement for Affected
Families
Under Chapter V Section 31, the collector has been empowered to pass the Rehabilitation
and Resettlement award for each affected family in terms of entitlement provided in the
Second Schedule.
The Second Schedule
[See section 31(2)]
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 90
Elements of Rehabilitation and Resettlement entitlements for all the affected families (both
land owners and the families whose livelihood is primarily dependent on land acquired) in
addition to those provided in the first schedule.
S.
No.
Elements of Rehabilitation and
Resettlement Entitlements
Entitlement/ provision
1. Provisions of housing units in
case of displacement
If a house is lost in rural areas, a constructed
house shall be provided as per the Indira Awas
Yojana specifications. If a house is lost in urban
areas, a constructed house shall be provided,
which will be not less than 50 sq. mtrs in plinth
area.
The benefits listed above shall also be
extended to any affected family which is without
homestead land and which has been residing in
the area continuously for a period of not less
than three years preceding the date of
notification of the affected area and which has
been involuntarily displaced from such area:
Provided that any such family in urban areas
which opts not to take the house offered, shall
get a onetime financial assistance for house
construction, which shall not be less than one
lakh fifty thousand rupees:
Provided further that if any affected family in
rural areas so prefers, the equivalent cost of the
house may be offered in lieu of the constructed
house:
Provided also that no family affected by
acquisition shall be given more than one house
under the provisions of this Act.
Explanation- The houses in urban areas may, if
necessary, be provided in multi-storied building
complexes.
2. Land for Land In the case of irrigation project, as far as
possible and in lieu of compensation to be paid
for the land acquired, each affected family
owning agricultural land in the affected area
and whose land has been acquired or lost, or
who has, as a consequence of the acquisition
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 91
or loss of land, been reduced to the status of a
marginal farmer or landless, shall be allotted,
in the name of each person included in the
records of rights with regard to the affected
family, a minim um of one acre of land in the
command area of the project for which the land
is acquired:
Provided that in every project those persons
losing land and belonging to the Scheduled
Castes or the Scheduled Tribes will be
provided land equivalent to land acquired or
two and a one-half acres, whichever is lower.
3 Offer for Developed Land In case the land is acquired for urbanization
purposes, twenty per cent of the developed
land will be reserved and offered to land owning
project affected families, in proportion to the
area of their land acquired and at a price equal
to the cost of acquisition and the cost of
development.
Provided that in case the land-owning project
affected family wishes to avail of this offer, an
equivalent amount will be deducted from the
land acquisition compensation package
payable to it.
4 Choice of Annuity or
Employment
The appropriate Government shall ensure
that the affected families are provided with
the following options:
(a) Where jobs are created through the
project, after providing suitable training and
skill development in the required field,
make provision for employment at a rate
not lower than the minim um wages
provided for in any other law for the time
being in force, to at least one member per
affected family in the project or arrange for
a job in such other project as may be
required; or
(b) One-time payment of 5 lakh rupees per
affected family; or
(c) Annuity policies that shall pay not less than
2000 rupees per month per family for 20
years, with appropriate indexation to the
consumer price index for agricultural
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 92
labourers
5 Subsistence grant for
displaced families for a period
of one year
Each affected family which is displace from the
land acquired shall be given a monthly
subsistence allowance equivalent to 3000
rupees per month for a period of one year from
the date of award.
In addition to this amount, the schedule castes
and the scheduled tribes displaced from
scheduled areas shall receive and amount
equivalent to 50000 rupees.
In cases of displacement from the scheduled
areas, as far as possible, the affected families
shall be relocated in a similar ecological zone,
so as to preserve the economic opportunities,
language, culture and community life of the
tribal com munities.
6 Transportation cost for displace
families
Each affected family which is displaced shall g
et a one-time financial assistance of 50000
rupees as transportation cost for shifting of the
family, building materials, belonging s and
cattle.
7 Cattle shed / Petty shops cost Each affected family having cattle or having a
petty shop shall get one-time financial
assistance of such amount as the appropriate
Government m ay, by notification, specify
subject to a minimum of 25000 rupees for
construction of cattle shed or petty shop as the
case may be.
8 One time grant to artisan, small
traders and certain others
Each affected family of an artisan, small traders
or self-employed person or an affected family
which owned non-agricultural land or
commercial, industrial or institutional structure
in the affected area, and which has been
involuntarily displaced from the affected area
due to land acquisition, shall get one time
assistance of such amount as the appropriate
Government may, by notification, specify
subject to a minimum of 25000 rupees
9 Fishing rights In cases of irrigation or hydel projects, the
affected families may be allowed fishing rights
in the reservoirs, in such manner as may be
prescribed by the appropriate Government
10 One-time Resettlement
Allowance
Each affected family shall be given a one-time
“Resettlement Allowance” of 50000 rupees only
11 Stamp duty and registration fee (1) The stamp duty and other fees payable for
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 93
registration of the land or house allotted to
the affected families shall be borne by the
Requiring Body.
(2) The land for house allotted to the affected
families shall be free from all
encumbrances.
(3) The land or house allotted may be in the
joint names of wife and husband of the
affected family.
5.5.1. Compensation for Houses
The compensation for a housing unit shall be determined as substitution/replacement
cost on the basis of latest consolidated Schedule of rate of Public Works Department
without consideration of any depreciation on cost. In case of acquisition of part
structure, the cost of ramanent structure shall be determined on the basis of
substitution/replacement cost in lieu of it considering the safety and practical aspect.
The cost of repair of partly affected structure shall be on the basis of 25% cost for
substitution of replacement reckoned on the basis of consolidated schedule of rate of
the PWD department. In case of “Katcha” structure the occupier / nominated person
shall be paid actual cost of structure subject to a minimum of Rs. 6000.
5.5.2. Compensation for Other Structures
The compensation for other structures shall be determined on the basis of latest
consolidated Schedule of rate of Public Works Department subject to a minimum of
Rs. 15000 per structure.
5.5.3. Compensation for Trees
The compensation for trees shall be payable on the basis of evaluation of cost by the
forest department
5.5.4. Compensation for Cattle shed
The families whose cattle shed has been acquired in the project area shall get one-
time financial assistance of Rs. 10,000/- subject to a maximum of Rs. 25000 per
family.
5.5.5. Resettlement Grant
(1) The PAF rendered small farmers on account of acquisition of land shall be shall
get one-time resettlement grant based on 750 days’ minimum wages besides this all
other PAF shall be paid resettlement grant equivalent to 500 days minimum wages
(2) Displaced shopkeepers will be given shops in allotment in the market complex of
the Project Township wherever the Project constructs such market places. In
addition, they will be entitled to one-time displacement grant of Rs. 20,000/-. The
commercial premises/shops allotted to such displaced shopkeepers shall be utilized
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 94
by them or their successors in interest for bonafide use only. In case the project is
unable to provide shops, displaced shopkeepers shall get financial assistance of Rs.
2,00,000/- cash.
(3) Infrastructure facilities in the Rehabilitation colony will include water supply,
sewage, drainage, electricity, streets community center, green area, park and
approach path/roads at the project cost. It shall be endeavored that the water supply
and other facilities shall be made available through Concerned Department / Nigam
such that O&M charges for these facilities are borne by the concerned department.
(4) Transportation at the project cost will be provided for physical movement of all the
PAFs and displaced shopkeepers and their houses hold good / shop goods, as soon
as the houses /shop get constructed in the rehabilitation colony or in some other
location chosen by the PAF or a sum of Rs 20000 in lump sum shall be paid, for
which option will be invited from the affected families’ /shop keepers.
(5) Transitional/Subsistence Allowance based on 25X12 days minimum wages to
each Project Affected family will be paid if the family has become houseless and has
to shift house or become landless and has to shift livelihood to a different location or
change livelihood or has been involuntarily displaced.
(6) Each PAF which is displaced and has Cattle will be given Rs. 20,000/- for
construction of cattle shed.
(7) Each PAF who is an artisan, small trader or self-employed person and has been
displaced shall get a one-time financial assistance of Rs. 50,000/- for construction of
working shed or shop.
(8) The families who have to shift house due to the project will be provided temporary
accommodation at project cost or shall be paid monthly rent @ Rs. 2500 per month
for 12 months.
5.5.6. Loss of income from Forest or Govt. Land:
The PAF‟s having rights over minor forest produce like herbs, chilgoza etc and the
acquisition of Govt/Forest land will deprive them of from income/benefit which they
were lawfully deriving from forest and pasture land shall be paid appropriate lump
sum ex-gratia amount. This lump sum amount shall be based on the income for one
year on the basis of the Schedule Rate of the concerned Forest Department or 25
days minimum agricultural wages for 12 months. If some portion of such land being
acquired and not being submerged or used for construction and kept as such or
maintained as a buffer zone around the reservoir or around the project, the PAF‟s
may be allowed to extract minor forest produce. The right to use forest produce
under this paragraph shall be subject to certification from no officer below the rank of
the DFO.
5.5.7. Employment
Direct Employment
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 95
One member of each project affected family rendered landless will be provided
employment by the project authority in the category of skilled/semiskilled/unskilled
workmen subject to fulfilling the requisite criteria/qualification. As and when any fresh
recruitment is done, the project authorities shall ensure that land oustees eligible for
employment, as mentioned above, are given first chance and outsider be considered
for recruitment only if none are eligible and/or not willing. However, persons who are
allotted shops shall not be eligible for benefit of employment and vice versa.
The following criteria will be adhered to by the Deputy Commissioner concerned for
providing of preference while sponsoring the names for employment to the Project
Authority.
i. Affected families whose entire land has been acquired.
ii. Affected families who have become landless on account of acquisition of land
by the project.
iii. If there are some families who have lost their source of livelihood completely
and do not have the capabilities or the financial strength to take any other occupation
or not provided alternate land, the project authorities may consider to provide direct
employment to the members of such families as a special case on the
recommendation from the Deputy Commissioner and after due verification of claims.
iv. The main PAF who are eligible for direct employment but have not been
provided employment will be given a special rehabilitation/employment grant
equivalent to 1000 days of minimum wage per family and the PAF‟s will be
considered for direct employment further.
v. Annuity Policy will be made for each vulnerable PAF [disabled, destitute,
orphans, widows, unmarried girls (with no financial support), abandoned women, or
poor persons above fifty years of age (who are unsupported)] who are not provided
or cannot immediately be provided with alternative livelihood and who are not
otherwise covered as part of a family will provided a pension of Rs. 1000/-PM for 5
years from the date of implementations of this plan and this will be continued for
lifetime. The Vulnerable PAF‟s will be those which are identified by the district
administrator based on the criteria identified.
5.5.8. Secondary Employment
The PAF’s will be provided help to get employment other than direct employment in
the project in the following manners: -
(1) Merit scholarship scheme for the wards of Project Affected Families (PAFs) and
other residents of project affected zone who may be pursuing vocational or
professional course will be introduced by the Project Authorities as per scheme to be
drafted by the Project Authority in consultation with Government of J&K. The Project
authorities will also consider getting some special seats in ITI’s for the project
affected families and other residents of the project affected zone. Some schemes to
provide apprenticeship or on the job training to increase the employability of the
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 96
residents of the project affected zone will also be started. Merit Scholarship scheme
for school going students of project affected zone will be started.
(2) The Project Authorities will also consider award of petty contracts to the
cooperatives of eligible families on preferential basis so that some may be engaged
in such jobs. Further, the Project Authorities will advise their contractor to engage
eligible persons from amongst effected families on a preferential basis wherever
possible during construction stage. Other employment opportunities like hiring
vehicles from PAF’s will also be made available. Normally all contracts upto a value
of Rs. 5 Lakh will be given to PAF’s and if PAF’s area not available to families living
in the project affected zone. All vehicles hired by the project will be from PAF’s and if
not available from PAF’s then from residents of Project Affected Zone. The new
vehicles hired from PAF’s may be hired for 3+1 years.
(3) The Project Affected Families will be assisted to start various suitable self-
employment occupations, which include dairy farming, poultry, weaving, bakery,
handicraft, cottage industries unit/shops and taxis, trucks, buses. The Project
Authority will provide a grant of Rs. 50,000/- per family toward seed capital. The
grant will be given once only.
“only those families who have not been provide with direct employment in the
Project or have not been allotted any shop will be eligible for this grant.”
Families residing in the project affected area other than PAF’s can also be
considered for this on merit and if they are needy.
Explanation:
The Deputy Commissioner, will certify the effect on source of livelihood in case of
rural artisans, small traders and self-employed persons for eligibility of the grant.
(4) The PAF’s and other fishermen having fishing rights in the river will also get
fishing rights in the reservoir.
(5) If any manpower is obtained by the project authorities through outsourcing at any
time during construction or running of the project for services like housekeeping,
gardening, typing, maintenance, computer work, office help etc. first opportunity will
be given to PAF’s as contractors and also as personal hired by contractor for their
jobs. If PAF’s are not willing, then other residents of project affected zone may be
considered.
5.5.9. Such tenants who have been residing in the project area for a period not less than 3
years preceding the date of Notification and duly verified by the district
administration shall be entitled for resettlement grant of Rs. 10000 only and a
lump sum amount equivalent to 500 days of minimum wages on account of loss
of livelihood.
5.5.10. Such occupiers who have been residing in any structure on Govt. land in the project
area for a period not less than 3 years preceding the date of Notification and duly
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 97
verified by the district administration shall be entitled under Section 4 of Land
Acquisition Act, 1894 for compensation for structure as assessed in the matter of
other matters. Besides a resettlement grant of Rs. 15000 only and a lump sum
amount equivalent to 500 days of minimum wages on account of loss of
livelihood.
5.5.11. In case of non-agriculture labour and project affected family of such labour, in
addition to the above-mentioned matters as applicable, shall be entitled for
amount equivalent to 500 days of minimum wages on account of loss of
livelihood.
5.5.12. Each PAF belonging to the category of ‘landless agricultural labour’, who has been
residing in the project area for a period not less than 3 years preceding the date
of Notification and who is not owner of the land but for livelihood works as
agriculture labour shall be provided a one-time financial assistance equivalent to
500 days of the minimum agricultural wages.
5.5.13. Each affected below poverty line family which is without homestead land and which
has been residing in the affected area continuously for a period of not less than
three years preceding the date of declaration of the affected area and which has
been involuntarily displaced from such area, shall be entitled to a house of
minimum one hundred square metre carpet area in rural areas, or fifty square
metre carpet area in urban areas (which may be offered, where applicable, in a
multi-storied building complex), as the case may be, in the resettlement area or
Rs. 4 lac in lieu of it.
5.5.14. R&R Benefits for PAFs belongings to ST & SC
1. In case of families loose access to forest due to projects a special plan will
be formulated for development of alternate fuel, fodder and no timber
forest produce.
2. Each PAF of ST followed by SC categories shall be given preference in
allotment of land if any land is available for allotment of PAF’s.
3. Each ST family will get an addition one-time financial assistance of 500
days minimum wages for labour for loss of customary right’s or usage of
forest produce.
4. ST. PAF’s will be resettled as far as possible in the same schedule area in
a compound block so that they can retain their ethnic, linguistic and cultural
identity.
5. The resettlement area prominently inhabited by S.T.s shall get 1000 Sqm.
land free of cost for community and religious gatherings or the community
shall be compensated for one time assistance of Rs. 2.5 lac.
6. The ST’s families resettled out of the district will get 25% higher
resettlement grant.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 98
7. Each PAF of SC and ST category shall get reward for the acquired land at
the circle rate prevalent in the nearest area as applicable for the general
category.
5.5.15. Other Benefits
1. Each PAF will be provided 100 units of electricity per month for a period of 10
years from the date of commissioning of the project. If the consumption of the
PAF is less than that then the difference will be compensated in cash.
2. Medical fund: A medical fund will be created for the PAF’s. This fund will be
provided for treatment to the member of PAF’s in hardship due to illness or in
extreme illness or accident cases. Medicines may also be provided to other
residents in the area.
3. Free medical treatment will be provided to PAF’s at the project medical facility.
4. Medical camps will be organized in various places in the project affected zone
from time to time.
5. In order to help the families living in the project affected zone and to improve
their skills in their occupation Agriculture, Horticulture and animal husbandry
training, small business, alternatives for self-employment and awareness
camps will be organized by the Project Authorities from time to time.
6. If it is felt that the fuel supply of the local residents is affected due to
construction of the project, a scheme will be formulated to provide alternative
fuel or fuel saving devices to the families whose fuel supply is affected.
7. Each PAF will be given an identity card which will have names of all the
members of PAF.
8. The project authorities will set up one or more Project Information Officer for
providing information and guidance to the local people particularly the PAF’s.
9. Project authorities will set up a cultural fund for providing grants for organizing
local fairs.
5.6. Identification of Project Affected Families
The details of the project affected families such as family member, livestock,
employment, land holdings, household assets and socio-cultural environment shall
be obtained through door to door survey at household levels and the details of land
likely to be acquired in different (project affected) villages shall be procured from the
concerned Revenue Authorities by Project Proponent for the actual identification of
PAF. Families shall be categorized into Large, Small, Marginal and Landless farmers
on the basis of their land holding capacity. The list of PAPs and their landholding and
other assets (house, shops, cattle sheds and trees) shall be finalized after the
verification from the concerned revenue department by project proponent. The
compensation package shall be accordingly formulated. It is evident from the
reconnaissance survey that total PAF from five villages shall be 640 of which none
shall be displaced due to acquisition of land.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 99
5.7. Budget for R&R Benefits
Budget for R&R benefits shall be prepared keeping in view the numbers of project
affected families losing houses, land, shops, water mills, cattle sheds, etc.
Categorization of Project Affected families, shall be prepared based on the
information provided by the project developer through Revenue Department and also
collected during socio economic survey shall be given in the format shown in Table
5.3.
Table 5.3 : Budget for various R&R benefits
Clause
No.
Provision as per “New LA, R&R Act, 2013” No. of
Eligible
nuclear
families /
persons
Rate as per
Act/Notification
Cost
(in Rs
lac.)
Rehabilitation & Resettlement package for affected families (as per RFCTLARR Act, 2013)
4 Choice of Annuity or employment
The appropriate government shall ensure that the
affected families are provided with the following
options:
a. Where jobs are created through the project,
after providing suitable training and skill
development in the required filed, make
provision for employment at a rate not lower
than the minimum wages provided for in any
other law for the time being in force, to at
least one member per affected family in the
project or arrange for job in such other
project as may be required; or
b. One-time payment of five lac rupees per
affected family; or
c. Annuity policies that shall pay not less than
two thousand rupees per month per family
for twenty years, with appropriate indexation
to the consumer price index for agricultural
labours
460
Rs. 5 lac per
affected family
(Option b)
2230
5 Subsistence grant for displaced families for a period of one year
Each affected family which is displaced from the
land acquired shall be given a monthly subsistence
allowance equivalent to three thousand rupees per
month for a period of one year from the date of
award.
In addition to this amount, the Scheduled Castes
and the Scheduled Tribes displaced from Scheduled
Areas shall receive an amount equivalent to fifty
5 Rs. 3000/- per
month per family for
one year from date
of award + Rs.
50000/- in addition
to the above
amount i.e. 86000
4.30
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 100
thousand rupees. per person
6 Transportation cost for displaced families
Each affected family which is displaced shall get a
one-time financial assistance of fifty thousand
rupees as transportation cost for shifting of the
family, building material, belongings and cattle
5 Rs. 50000 2.50
7 Cattle shed / petty shops cost
Each affected family having cattle or having a petty
shop shall get one time financial assistance of such
amount as the appropriate government may, by
notification specify subject to a minimum of twenty –
five thousand rupees for construction of cattle shed
or petty shop as the case may be.
59 Rs. 25000 14.75
8 One timer grant to artisan, small traders and certain others
Each affected family of an artisan, small traders or
self-employed person or an affected family which
owned non-agricultural land or commercial,
industrial or institutional structure in the affected
area, and which has been involuntarily displaced
from the affected area due to land acquisition, shall
get one time assistance of such amount as the
appropriate government may , by notification ,
specify subject to a minimum of 25000 rupees.
20 Rs 25000 5.00
10 One – time Resettlement Allowance
Each affected family shall be give a one-time
“Resettlement Allowance” of fifty thousand rupees
only.
5 Rs. 50000 2.50
Sub Total 2259.05
Rehabilitation & Resettlement package for Affected families
1 The PAF rendered small farmers on account of
acquisition of land shall be shall get one time
resettlement grant based on 750 days minimum
wages besides this all other PAF shall be paid
resettlement grant equivalent to 500 days minimum
wages
446 Rs 500 x 204 454.92
2 Displaced shopkeepers will be given shops in
allotment in the market complex of the Project
Township wherever the Project constructs such
market places. In addition, they will be entitled to
0 Rs. 200000 0.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 101
one-time displacement grant of Rs. 20,000/-. The
commercial premises/shops allotted to such
displaced shopkeepers shall be utilized by them or
their successors in interest for bonafide use only. In
case the project is unable to provide shops,
displaced shopkeepers shall get financial assistance
of Rs. 2,00,000/- cash
3 Transportation at the project cost will be provided for
physical movement of all the PAFs and displaced
shopkeepers and their houses hold good / shop
goods, as soon as the houses /shop get constructed
in the rehabilitation colony or in some other location
chosen by the PAF or a sum of Rs 20000 in lump
sum shall be paid , for which option will be invited
from the affected families /shop keepers
5 20000 1.00
4 Merit scholarship scheme for the wards of Project
Affected Families (PAFs) and other residents of
project affected zone who may be pursuing
vocational or professional course will be introduced
by the Project Authorities as per scheme to be
drafted by the Project Authority in consultation with
Government of J&K. The Project authorities will also
consider getting some special seats in ITI’s for the
project affected families and other residents of the
project affected zone. Some schemes to provide
apprenticeship or on the job training to increase the
employability of the residents of the project affected
zone will also be started. Merit Scholarship scheme
for school going students of project affected zone
will be started
100 2500 x 12 x 4 120.00
5 The Project Affected Families will be assisted to
start various suitable self-employment occupations,
which include dairy farming, poultry, weaving,
bakery, handicraft, cottage industries unit/shops and
taxis, trucks, buses. The Project Authority will
provide a grant of Rs. 50,000/- per family toward
seed capital. The grant will be given once only
100 Rs. 50000 50.00
6 Each ST family will get an addition one-time
financial assistance of 500 days minimum wages for
labour for loss of customary right’s or usage of forest
produce
100 Rs. 204 X 500 10.20
7 Assistance to villagers of project affected villages at
the village level for meeting the loss of firewood due
to acquisition of van panchayat land for a period of
five years
7 X 12 X 7 10000/month/village 58.80
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 102
Sub- Total 694.92
Grand Total 2953.97
Say 2954.00
5.8. Infrastructure Facility Proposed in Resettlement Area
The project as per DPR does not envisage provision for development of
Resettlement and Rehabilitation area as the project affected families shall be paid
compensation for their assets and land, apart from the R&R grant under the
RFCTLARR Act, 2013 and other benefits. As the displaced family, will settle at their
own there shall be no need for creating infrastructure facilities for the PAFs. In case
the displaced PAF wish to be resettled at a new resettlement colony, the new colony
shall be provided with minimum facilities infrastructure amenities/ facilities as
contained in Schedule 3 or the RFCTLARR Act, 2013. Appropriate rehabilitation plan
in consonance with the prevalent laws, at the time of acquisition of land and assets,
shall be implemented. For creating infrastructure facilities, the budgetary provision
has been incorporated in DPR.
5.9. Preference of PAF in Terms of Compensation
Most of the people interacted have shown their willingness to be compensated for
the acquired agriculture land but a few people expected the project proponent to
provide agriculture land. They also expect cash compensation for their houses and
other immovable assets like shops and cattle sheds. They have shown their
willingness to receive in cash other ex-gratia payments and landless grants,
transitional / subsistence allowance.
5.10. Compensation Disbursement
All the compensation related to land, property, infrastructure development should be
made transparent for which a suitable mechanism may be worked out in consultation
with district administration and preferably all the payments should be made through
bank drafts.
5.11. Dispute Redressal Mechanism
For ensuring the implementation of rehabilitation and resettlement scheme and
compliance under the agreed policy, during the implementation of the scheme and
thereafter monitoring and evaluation shall be carried out by departmental and
monitoring committee. The appropriate Govt., for implementing the rehabilitation and
resettlement scheme and monitoring and review of the progress thereof and
conducting social audit by Rehabilitation & Resettlement Administration, where it has
been so designated and where it has not been designated, in that scenario, shall
constitute a committee to be called as resettlement and rehabilitation committee
under Chairmanship of a Senior Government Officer.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 103
The Resettlement & Rehabilitation Committee constituted as above besides the
officers of J&K Govt. shall inter-alia include as one of its members: -
a. A representative of women residing in the affected zone;
b. A representative, each from of the Scheduled Castes and Scheduled Tribes
residing in the affected zone;
c. A representative from a voluntary organization;
d. A representative of the lead bank.
e. A representative of the land acquisition officer;
f. Chairman or his nominee from Panchayat Raj Institutions located in the affected
zone
g. MPs/MLAs of the area included in the affected zone.
h. Representative for Project Proponent.
5.12. Appointment of Ombudsman
For Timely Redressal of Grievances/Complaints touching and arising within the
framework of this policy, the Govt. of J&K shall appoint an ombudsman.
5.13. Summary of Cost
The cost on account of Rehabilitation Grant shall be worked out on the basis of the
actual information about the PAF and their other assets like house, shops, cattle
sheds and etc.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 104
6. GREEN BELT DEVELOPMENT PLAN
6.1. Introduction
While improving the aesthetic of the area the greenbelt though functioning as
pollutant sinks while scavenging pollutants, also incidentally help in developing
habitats for birds and animals. The plants in their function as scavenger of pollutants
are also prone to suffer toxicity of air pollutants like any other living organism. In
order to mitigate and minimize environmental impacts from air pollution, noise
pollution, soil erosion etc. arising due to construction of project, greenbelt
development around the project sites is a good option. Green canopy not only
absorbs some of these pollutants but also improves the environment. Therefore, a
“Green Belt Development Plan” by using the local species has been proposed
around the project area, colonies and the project roads.
6.2. Development of Greenbelt
The green belt is proposed to be developed within the project area along the network
of approach roads, residential areas, office complex, surge shaft site, power house
site, and other working areas like crushing and aggregate processing plant, batching
plant and workshops. The strategy worked out for development of green belt consists
of the following:
The species selected should be capable of growing fast,
The species should be wind firm and long lived.
Broad leaf trees growing above 10 m in height should be planted along the
roads, offices and infrastructure facilities.
The species should form a dense crown cover.
The species should form a litter in abundance on the plantation flow.
Generally local/indigenous fast growing trees shrubs should be planted.
The trees should be protected by plantation of non-palatable shrub species to
avoid browsing by animals.
Placement of tree guards (metal tree guard, pre-feb RCC tree guard, Fiber tree
guard etc.), should be provided to save avenue plantation.
For protection against biotic interference thorn fencing around the plantation,
circular trench around the planting pit and sown with fast growing thorny shrubs
on the ridge should be followed.
The schematic arrangement of greenbelt development proposed along the roads and
office/colony is presented in Figure 6.1. It is proposed that extensive plantation in
degraded forest land around the periphery of diversion barrage, area around power
house will be taken up besides road side plantation along approach/haul roads. In
areas wherever private land falls along the periphery of the project area the
plantation will be done by distributing saplings free of cost to villagers, so that they
are motivated to take up plantation in their land.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 105
Figure 6.1 : Schematic Arrangement of Greenbelt Plantation
6.3. Guidelines and Techniques for Green Belt Development
Extensive survey in the project area was undertaken to observe the vegetation types
and its density. Soil characteristics were also kept in mind. Based on the survey and
environmental conditions suitable plant species have been proposed for green belt
development. To meet the requirement of saplings for development of green belt, a
temporary nursery with following details is suggested:
6.3.1. Size of Nursery
The size of nursery depends upon the number and type of seedlings to be produced.
To produce 50,000 plants a nursery of about 0.5 ha area would be required.
6.3.2. Nursery Site Selection
A well-drained site near the areas where plantation is to be carried out is always
preferred. Light shading site for the nursery is important for the protection of the
young seedlings against sun, frost, hailstorms or heavy rains. Sites, which are prone
to water logging, should not be selected and sites shall be selected in consultation
with Forest Department preferably near the existing one. Modernization of existing
nursery may also be explored. In the present case the modernization of forest
nursery at Gulabgarh (2.50 ha) is proposed to meet and the demand of 50,000 trees
under the green belt development plan.
6.3.3. Transportation
The nursery should be readily accessible all the year round in order to facilitate
transportation of materials required in the nursery and dispatch of seedlings from the
nursery.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 106
6.3.4. Fertilizer Application
The organic fertilizer produced through domestic organic waste coupled with vermin
compost can be utilized for the nursery. Farmyard manure (FYM) can also be used
but chemical fertilizer should be avoided. The compost / vermin compost proposed to
be developed through solid waste management.
6.3.5. Soil and Soil Fertility
The best site for raising the nursery is the area, which has got a thick layer of humus.
The fertile and well-drained soil with sandy loam to loamy texture, pH varying from
5.5-7.5 should always the preferred for nursery sites.
6.3.6. Water Supply and Drainage
The site should have perennial water supply. The drainage of soil has important
bearing on the health of seedlings.
6.3.7. Species to be Planted
The choice of plant species for plantation in greenbelt is mainly governed by the
natural factors of bio-climate of the area. For efficacious removal of pollutants
(gasses / fugitive dust), It is essential that the plants developed in conditions
confirming to adequate supply of nutrition for their growth, availability of water to
avoid water stress i.e. to maintain openness of stomatal apertures and form of
epidermal structures. Besides the adequate exposure to sunlight and wind i.e.
without hindrance to free flow of air. In the project area, pollutants like SO2 and NOx
shall result from the operation of construction/excavation machinery and movement
of vehicles besides particulate matter mostly SPM/PM10 shall result as fugitive dust
emission from movement of vehicles on Kutcha Haul roads and also as primary
source from quarrying activities. It is suggested that spreading / round canopy
shaped trees should be planted nearby the construction site like stone crushers /
excavation sites and oblong and conical trees along the roadside. For absorption of
gases pollutants, it is necessary to plant such trees which have tolerance towards
pollutants at reasonable concentration; have longer foliage period and freely
exposed foliage besides large number of stomatal apertures. For removal of
suspended particulate matter high trees with good spread of crown with leaves firmly
supported on petioles and abundance of surface area on bark and foliage should be
planted. As per bio-climatic zone of India the study area lies in Western Himalayan
region in valley temperate sub-zone. A list of indigenous trees found suitable after
identification of species for raising in the nursery and for development of green belt
around the project area is given in Table 6.1.
Table 6.1 : Suggested Plant Species for Green Belt Development
S.No. Botanical Name Local Name
1 Aesculus indica Goo Green, Indian Horse Chestnut
2 Ailanthus excelsa Ardusi, Peeda
3 Alnus nitida Champ, Himalayan Alder
4 Juglans regia Walnut, Akhrot
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 107
5 Prunus armenica Plumcot, Khubani
6 Pyrus pashia Indian wild pear
7 Pyrus malus Apple, Saib
8 Robinia pseudoacacia Black Locust
9 Salix alba White Willow
10 Ulmus wallichiana Kashmir Elm
11 Celtis australis
Besides, the above tree species, the shrub species identified for plantations are;
Cotoneaster bacillaris, Colutea nepalensis, Elaeagnus umbellata, Spiraea canescens
and Rosa webbiana.
6.3.8. Precautions during Plantation
Some important precautions should be taken during the plantation, which are as
under:
Open grazing is practiced in general in the area; therefore, protection should be
provided in advance.
Polyculture should be practiced. Mixture by group should be preferred over
intimate mixture.
Species mentioned should be planted in sufficient numbers so as to increase
their population size in the area.
Multipurpose species should be planted in large numbers, so as to provide
direct benefit to people living around.
6.4. Green Belt Development
In order to raise the green belt around project areas and other components the total
requirement of different species of plants will be for 50,000 saplings. Since the green
belt is to be created over a period of five years the maintenance for a period of five
years of nursery and plantation works will be required. The beating up of mortality
may be done with the plant stocks proposed to be generated in the nursery over the
complete duration of the plan.
6.4.1. Road side plantation
Cost of the plantation has been calculated as per the existing schedule of rate,
material cost (plants, FYM, tree guard, etc.) and the total area of treatment. One row
each for tree, shrub and bio-fencing has been proposed with a spacing of 3 m x 3 m
for trees and 2 m x 2 m for shrubs (to take care of the mortality in the next season).
The pit size has been recommended as 45 x 45 x 45 cm for trees and 30 x 30 x 30
cm for shrubs. The cost of pit digging and filling is estimated at Rs. 10 per pit. Input
of FYM @ 2 kg/pit has been suggested costing around Rs.5/pit. Cost of plantation
including transport has been estimated at Rs. 10/plant making the total cost of
planting one tree as Rs. 25. For the protection of trees from the cattle and other
losses, thorny bushes guards are required. Along the approach roads of about 10 km
length plantation will be done on both sides where ever feasible as such plantation of
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 108
about 16660 saplings will be done. Plantation along roads must take into account
visibility aspects on curves so as to ensure safe driving.
6.4.2. Green Belt around Diversion Dam/Reservoir / MAT to Power House
Plantation at the intake site, reservoir rim in 10 m width along 9.5 km length on either
banks i.e. in about 19 ha and 1.0 ha in respect of Dam and power house MAT sites
totaling about 20 ha has been proposed for control of erosion and siltation of the
stream and aesthetic importance. The total cost for planting in 20 ha area @ Rs.
88,200/ ha including establishment charges works out to be Rs. 17.64 lacs.
6.4.3. Green Belt around Residential Area and Office Complex
Plantation around the office complexes is proposed to be done so that greenery is
developed. Precaution should be exercised by not planting large size trees around
buildings and other similar structures as during winter the sun rays are obstructed by
them invariably and much wanted sunshine is impaired. Besides this, it is also
proposed to develop green belt around the working areas for trapping the dust and
noise. Plantation of avenue, ornamental and fruit trees is proposed in these areas
along with the area around office complex. The ornamental, fruit plants will be
procured from the local market while the avenue plants will be raised in the project
nursery. For providing green belt around dam, residential areas and office complex
a provision of Rs.38.00 lac has already been made under head M-Plantation in the
DPR.
6.5. Cost Estimate of Green Belt Development
Table 6.2 : Summary of Cost for Green Belt Development
Sl.
No.
Component Cost (in Lacs)
1. Development of 0.5 ha nursery @ Rs. 20.0 lac / ha 10.00
2. Maintenance of nursery @ 2.0 lacs/each year for 5 years 10.00
3. Cost of planting of saplings around dam, intake and power house
MAT site for 15 ha @ Rs. 88200/ha
13.28
4. Maintenance cost for 5 years – 2 chowkidars @ Rs. 8000/- per
month
9.60
5. Thorny brush wood protection guard for 6600 saplings along road
side @ 7.20/No.
0.48
6. Live hedge fencing on either side of the approach and haul road.
(10km) on either side@ Rs. 12/RM
2.40
7. Cost of planting 6600 saplings along road side @ Rs. 25/- each 1.65
8. Plantation around colonies and office complex 40.00
9. Contingency 2.00
Total 89.41
Less provision under sub-head “M-plantation” as per DPR 60.90
Net debitable under green belt development plan 28.51
Say Rs. 29.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 109
7. RESERVOIR RIM TREATMENT PLAN
7.1. Introduction
The impounding reservoir behind the proposed 146 m high dam, top El 1766 masl,
having FRL and MDDL respectively at 1764 masl and 1750.75 masl, shall extend at
FRL to a distance of 8.75 km in river Chenab and live storage of 17 MCM at FRL
(1764 masl) and diurnal storage 8.5 MCM respectively. The reservoir shall
submerge 331 ha of land. The reservoir shall also extend into eight nadi/nala details
of which are given in Table 13.1. The overall river bed slope in the reservoir area is
about 16.5 m/km which suggests that in the reservoir area the river flows in steep
slopes/rapid. Due to the project a sudden change shall be brought about in the
existing riverine scenario to lacustrine condition. The toe of steep hills towering over
the river bed shall be subjected to elevated water surface level, due to the reservoir.
The rock mass which had not experienced the flow of river before shall be subjected
to hydraulic conditions apart from many other direct and indirect factors responsible
for instability of land masses. All such factors that facilitate sliding in one way or the
other can be grouped into two headings i.e. internal and external factors.
The internal factors include such cause which tends to reduce the shearing strength
of the rocks, the water content of the rock masses, their mineralogical composition
and metrological character, structural features and the state of stress are important
internal factors. External factors include mainly vibrations either naturally by an
earthquake or artificial due to heavy traffic and rock blasting. Besides these, removal
of support at the foot of the slope i.e. toe failure by high velocity of flow is another
cause. Water charging of soil strata due to water storage reduces coefficient of
friction causing land slide or slope failures. Therefore, an assessment of geological
conditions and geo-technical evaluation of the reservoir area gives adequate
information of the behavior of reservoir.
In the stretch of the river where the reservoir shall be formed, it runs through a
narrow defile between very steep cliffs for about 4 km and then before opening out to
comparatively wider vale, Paddar valley. Therefore, most of the area drains directly
into the river. The project area is well interspersed by a system of rivers and
tributaries which are prone to flash floods. It represents a typical steep – sided young
valley with overlapping spurs. The stretch is an area of high energetic relief where
the river is in its active down cutting stage and flows more or less in a straight course
westward. The submergence map with location of five land slide, two on right bank
near village Laie and three on the left bank is shown in Figure 7.1 through 7.5.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 110
Table 7.1 : Details of Nadi / Nala into which the Reservoir Extends
S. No. Name of Nadi / Nala Bank
1 Sungala Right
2 Kichar Right
3 Karna Left
4 Mutha Left
5 Alphani Left
6 Honser Left
7 Punch Left
8 Kundal Left
7.2. Causes of Land Slides / Slope Failures
Identification of causes attributing a landslide is helpful in assessment of appropriate
restoration / protection measures. A few causes responsible for the rampant slides
and other mass movement in the area are:-
Lithological and structural condition of bed rocks Poor structural state of slates and quartzite and their lithological characteristics
are the passive cause of incidence of landslides in the area.
Meteorological Factors The reservoir area receives very nominal annual rainfall. The downpour over
geologically and structurally deformed rocks like shales and phyllite causes slope
failure. During rainy season abundant percolation through joints of
quartzites/slates causes rise in pore water pressure and thus the movement of
grain.
Denudation Deforestation brought about by illegal and indiscriminate felling of trees, removal
of vegetal cover by people aggravated by the forest fire and the construction of
roads through susceptible zones cause denudation of slope surface and
activates the slides.
Toe-Erosion Just like the base failure of any structure caused by eccentric loading condition,
the fast-flowing currents attack the toe material of weaker zones and the erosion
process of the river on outer banks promotes the toe.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 111
HACHOT FOREST
Dhurk
ui
Shirir N
Chanas
Chauki
Open Scurb
RutanaKuheg N
KUGON FOREST
Phulin
SHIMPAN
SHASHO R H
Pan N
ar
SHIRIR FOREST
SHIRIRki
dur
N
KIDURIamur Puhali
Dense mixed jungle
K a
t s
a r
D
h a
rL idre
r N
Rel G
ad
DANDWAR FOREST
Talatun Puholi
Sen PuhaliK
ara
na N
a
CHANDRA BHAGA OR GADOR R
BODARBAN FOREST
Sunga
la N
WUCHIR FOREST
Dense mixed jungle
Dense mixed jungle
Dense mixed jungle
Rotdhar Puhali
KOL
Charwas Puhali
Diaban PuhaliSungul
SORA FOREST
Kahot Puhali
Somot Puhali
Nagariun
GulabgarMat
Arthal
Kundal
P OHugai
Lauj
LAUJ FOREST
kota
rur
Rawhar Puhali
BHETAL BUZAR FOREST
Aphani N
Hahswa
Kijai
Aphani
KirthaiZar
Kadhel
Muth
a Na
Rope Bridge
Laie
Nalhoran
Her Pass
Khatasar Puhali
Gwardhar Puhali
DAM SITE
N
L-1L-2
L-3
L-4
L-5
0 1 2KM
LOCATION MAP OF LAND SLIDE
Scale
CONTOUR
RIVER
ROADLEGEND
DAM SITE
VILLAGE
Figure 7.1 : Location Map of Land Slide
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 112
Figure 7.2 : Pictorial View of Landslide L-1
Figure 7.3 : Pictorial View of Landslide L-2
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 113
Figure 7.4 : Pictorial View of Landslide L-3
Figure 7.5 : Pictorial View of Landslide L-5
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 114
7.3. Treatment Measures for Land Slides
The minor slides observed on hill slopes just in the vicinity of the proposed reservoir
area and the places where mass movement has been distinctly noted and which are
said to be existing for sufficient long time, need corrective or control measures before
water level changes are brought about by the impounding of proposed reservoir.
A control method for landslides is based on either strengthening earth materials
(increasing resisting force) or reducing the mass weight within potential sliding mass
(decreasing driving force) or both. For a sliding mass, the control methods require
halting or reversing those factors that worsen its stability. The conventional methods
are best suited to these slides which are already in their critical stage. The measure
includes profile modifications, adequate surface drainage to avoid saturation of
water, stabilization of landslide by vegetation, “hard” remedial treatment as retaining
or restraining structures and ground anchors etc. The biological measures are
proposed for non-submergence zone and include such mean which render
stabilization of surface of land slide by vegetation such as plantation of grass,
shrubs, trees. Along moist drainage line is suggested. Contours hedge with
extremely dense planting of cutting of perennial shrubs / bushes shall be resorted to.
The details of proposed measures engineering / biological in respect of each of the
land slide with cost are shown in Table 7.2.
Table 7.2 : Details of Proposed Engineering and Biological Control Measures
Land
Slide
No.
Description of Measures Quantity Unit Rate Amount
(INR Lac)
L-1 Retaining wall of stone masonry
in cement mortar 1:6
2x100x4x1.4
1120 m3 1782.00 19.96
Retaining wall of dry stone
masonry
2x100x3x1.3
780 m3 996.00 7.77
RCC retaining wall 6m high 100 RM 26505 26.51
Shrub plantation 40000 No. 5.00 2.00
Seed spray 10 Kg. 5000.00 0.50
Sub-Total for L-1 56.74
L-2 Retaining wall of stone masonry
in cement mortar
2x250x4x1.4
2800 m3 1782.00 49.90
RCC retaining wall 6m high 250 RM 26505.00 66.27
Shrub plantation 80000 No. 5.00 4.00
Seed spray 20 kg 5000.00 1.00
Sub-Total for L-2 121.17
L-3 Retaining wall of stone masonry
in cement mortar
1680 m3 178200 29.94
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 115
Land
Slide
No.
Description of Measures Quantity Unit Rate Amount
(INR Lac)
300x4x1.4
Retaining wall of dry stone
masonry
3x300x3x1.3
3510 m3 996.00 34.96
RCC retaining wall
4x50
200 RM 26505.00 53.10
Gabian wall
50x10x2x1.5
1500 m3 1240 18.60
Shrub plantation 20000 No. 5.00 1.00
Seed spray 10 Kg 5000 0.50
Tree plantation 400 No. 50 0.20
Sub-Total for L-3 138.3
L-4 Retaining wall of stone masonry
in cm 300x4x1.4
1680 m3 1782.00 29.94
Retaining wall of dry stone
masonry
300x3x1.3
1170 m3 996.00 11.65
RCC retaining wall 6m high 150 RM 26505.00 39.76
Gabion wall
30x10x2x1.5
900 m3 1240.00 11.16
Shrub plantation 20000 No. 5.00 1.00
Tree plantation 200 No. 50 0.10
Sub-Total for L-4 93.61
L-5 Retaining wall of stone masonry
in cement mortar
2x300x4x1.4
3360 m3 1782.00 59.88
Retaining wall of dry stone
masonry
2x300x3x1.3
2340 m3 996.00 23.31
RCC retaining wall
4x50
200 RM 26505.00 53.10
Gabion wall
40x10x2x1.5
1200 m3 1240.00 14.88
Shrub plantation 100000 No. 5.00 5.0
Seed spray 40 Kg 5000 2.0
Sub-Total for L-5 158.17
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 116
Land
Slide
No.
Description of Measures Quantity Unit Rate Amount
(INR Lac)
Grand Total L-1 to L-5 567.99
7.4. Protection Of Houses / Fields
The human settlements and agricultural fields at some villages are very close to FRL
of reservoir. Therefore, such places need protection for their land and houses for
which it is proposed to construct concrete retaining wall along the stretch of reservoir
at potentially vulnerable places having a combined length of about 0.6 km as
depicted in Table 7.3. The cost of protection walls of 6 m height has been assessed
as Rs. 160.36 lac and is shown in Table 7.4.
Table 7.3 : Village wise length of RCC Wall Protection
S. No. Name of Village Length (km)
1. Lai 0.40
2. Kirthai 0.20
Total 0.60
Table 7.4 : Cost of Protection Walls
S.
No
Particulars Quantity Unit Rate Amount
1. CC M: 20 for RCC wall
Base = 600 x 3.6 x 0.4 =
864
Stem = 600 x 5.6 x 0.33 =
1109
= 1973
1973 m3 6511 128.46
2. Cost of steel
reinforcement
40 MT 56000 22.40
3. Centering and shuttering
2x600x0.4 = 480
2x600x5.6 = 6720
= 7200
7200 m2 132.00 9.50
Total 160.36
7.5. Treatment At The Mouth Of Streams Joining Reservoir
The hill torrents / rivulet have steep gradient and during rains very high discharges
flow in them with high velocity. Wherever these torrents meet main rivers there is a
large difference in their bed levels. Such torrents are also potential carrier of highly
sediment concentrated flows resulting from high velocities attained by them during
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 117
flash floods which some time becomes as high as 10m/sec. loose deposits or shoal
are therefore often witnessed just upstream of confluence point of such streams with
main river. The mouths of these streams have a tendency of sliding and widening
basically because of following reasons:
These are subjected to change in hydraulic conditions depending upon the fluctuation of water level of the main river during different period of the year and abrupt water level changes brought about during monsoon. The changed gradient of ground water affects the pore water pressure of the soil mass of banks at the mouthing and reduces the shear strength of the rock-mass which disintegrates.
The sediment load carried by the hill streams get deposited at the mouth and thus obstruct the high flow during monsoon there by increasing the flow velocity near banks which cause toe-erosion.
Due to the changes in flow conditions at the mouth of streams, from super critical to sub critical the energy dissipation takes place and the bank material faces the onslaught.
The FRL of the reservoir has to vary between El. 1764 masl to 1750.75 masl i.e. 13.25 m though the variation is to take effect over a considerable long period/duration, there are no chances of sudden draw down of water in the reservoir, yet due to looseness of strata at the mouths sliding cannot be ruled out.
The mouth of the streams are generally constituted of riverine material usually shingle, pebbles, boulder and fine sediments like clay, silt and sand which have lower shear strength. Swelling caused due to hydration of clay is the main cause of mass movement.
Therefore, the mouth of these streams directly draining into reservoir need to be
protected against toe-erosion at the level of FRL of reservoir by RCC retaining wall in
the immediate length of either bank followed by gabion walls. The sediment load
transported by the streams can be minimized by making check dam size 10 m x 1.5
m x 3.0 m, 20 each in respect of 8 Nadi / Nala meeting the reservoir. The cost of
these works has been assessed as Rs. 100.00 lac.
Table 7.5 : Cost Estimate of Mouth Treatment of Stream
S. No.
Measures Quantity Unit Rate Amount (Rs. in Lac)
1. RCC retaining wall 6m high in 40m length each on both bank of a nala at the mouth i.e. in 320 m length for all 8 drains
320 RM 26505 84.82
2. Gabion wall approx. 50m length on each banks of Khad in continuation of RCC retaining wall in total length 400m Total
1200 m3 1240.00 14.88
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 118
S. No.
Measures Quantity Unit Rate Amount (Rs. in Lac)
quantity
= 400x 2x 1.5
Total 99.70
Say 100.00
7.6. Overall Cost Of Reservoir Rim Treatment
The summed-up cost of various activities involved in the comprehensive reservoir
rim treatment plan is Rs. 828.00 lac as enumerated in Table 7.6.
Table 7.6 : Total Cost of Reservoir Rim Treatment
S.
No. Measures to be adopted Amount
(INR in Lac)
1. Treatment of landslides 567.99
2. Protection of houses / fields 160.36
3. Treatment of the mouth of the major streams/khad
joining reservoir directly
100.00
Grand Total 828.35
Say 828.00
:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 119
8. MUCK MANAGEMENT PLAN
8.1. General
For construction of different components of the project substantial surface and
underground excavation in over burden and rock for Dam intake structure, intake
tunnel, desilting chambers, flushing duct, headrace tunnel, tank and tail race and
powerhouse etc. would be required. The excavation shall result in large quantity of
excavated material i.e. muck which shall have to be evacuated, disposed off and
roller compacted or laid on mild slopes pari-passu with the excavation work, to such
designated areas where the muck piles do not substantially interfere with either
environment / ecology or the river flow regime and cause turbidity impairing the
quality of water. The disposal of muck has to be scientifically planned keeping in
view the pecuniary aspects necessitating nearness to the generating component of
work, which understandably reduce the travel time of dumpers, interference to
surface flow and ground water aquifer, and disposition of habitation. In the present
case, the total quantity of muck / debris, to be generated due to the project, shall be
3025921 cum which with swell factor shall amount to 4296808 cum, out of which
3,007,765 cum shall be consumed on project work leaving 1289042 cum to be
dumped at designated sites. It is, therefore, proposed to utilize about 70% of the
excavated material on the project activities. The balance 30% shall have to be
disposed off away from sites so as to make available the clear site for construction
activities. The balance muck shall be properly stacked and roller compacted or
dumped on slopes and treated to mix and match with the surrounding environ with
least change in landscape.
Based on the quantities of surface and underground excavation including 10% over
break a muck management plan, therefore, has been formulated to manage the
disposal of muck and restore such areas from further degradation of the
environment. During construction of the project, huge quantities of excavation will be
carried out from the underground and open air components and shall be either roller
compacted to provide stable terraces for erection of labour camps, job facilities and
storage area, or dumped in designated areas to provide stable slopes as per details
given in Table 8.1.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 120
Table 8.1 : Component Wise Details of the Muck Generated and its Management
Sr. No.
Project Component
Excavation in earth and
boulder and riverbed
Rock Excavation
Quantity of Muck/Debris
generated
Total Quantity of Muck/Debris
including swell factor
Estimated Quantity of Muck/Debris proposed to be
utilized (including swell factor)
Estimated Quantity of
Muck/Debris proposed to be
dumped
1 2 3 4 5 6 7
1 U/s and d/s coffer dam
3746 33718 37464 53199 37,239 15960
2 Diversion tunnel 9843 155779 165622 235183 164,628 70555
3 Main Dam 26470 238231 264701 375875 263,113 112763
4 Intake 5095 236579 241674 343177 240,224 102953
5 Desilting Chamber 0 454360 454360 645191 451,634 193557
6 HRT 0 622197 622197 883520 618,464 265056
7 Surge Shaft 0 97430 97430 138351 96,845 41505
8 Pressure Shaft, BV Chamber and Penstock
0 118710
118710 168568 117,998 50570
9 U/G Power house complex 0 361506 361506 513339 359,337 154002
10 TRT 0 44227 44227 62802 43,962 18841
11 Power House (Dam Toe) 22890 206010 228900 325038 227,527 97511
12 TRC (Dam Toe) 38913 350217 389130 552565 386,795 165769
Total 106957 2918964 3025921 4296808 3,007,765 1289042
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 121
8.2. Quantity of Muck Generated and Its Consumptive Use
It is eloquent from Table 8.1 that 3025921 cum of muck, which amounts to 4296808
cum on swell basis, will be generated due to excavation, out of which 3,007,765 cum
is proposed to be re-utilized as construction material for consumptive use in non-
wearing surface like back fill, shotcreting and plum concrete in construction of water
conductor system like HRT, surge shaft, pressure shaft, MAT, TRT, other adits and in
development works. Thus, the remaining 1289042 cum quantity shall be disposed off
at designated sites. The disposed muck at these shall be roller compacted to develop
terraces for erecting labour camps, site offices, storage yards and other job facilities.
Both dumping locations shall be well supported at base and at also at higher
elevation by suitable retaining structures. Subsequently all the spoil tips (muck
disposal sites) will be developed by taking up plantation through bio-technological
method to generate a thick forest canopy over them. The location of the dumping
sites is depicted in Figure 8.1.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 122
HACHOT FOREST
Dhurku
iS
hirir N
Chanas
Chauki
Open Scurb
RutanaKuheg N
KUGON FOREST
Phulin
SHIMPAN
SHASHO R H
Pan N
ar
SHIRIR FOREST
SHIRIR
kidur
N
KIDURIamur Puhali
Dense mixed jungle
K a
t s
a r
D
h a
rL id
rer
N
Rel G
ad
DANDWAR FOREST
Talatun Puholi
Sen Puhali
Kara
na N
a
CHANDRA BHAGA OR GADOR R
BODARBAN FOREST
Sunga
la N
WUCHIR FOREST
Dense mixed jungle
Dense mixed jungle
Dense mixed jungle
Rotdhar Puhali
KOL
Charwas Puhali
Diaban PuhaliSungul
SORA FOREST
Kahot Puhali
Somot Puhali
Nagariun
GulabgarMat
Arthal
Kundal
P OHuga
Lauj
LAUJ FOREST
kota
rur
Rawhar Puhali
BHETAL BUZAR FOREST
Aphani N
Hahswa
Kijai
Aphani
KirthaiZar
Kadhel
Muth
a Na
Rope Bridge
Laie
Nalhoran
Her Pass
Khatasar Puhali
Gwardhar Puhali
DAM SITE
N
LOCATION MAP OF MUCK DISPOSAL SITE
M-7M-6 M-5
M-4
M-3
M-2
M-1
0 1 2KMScale
CONTOUR
RIVER
ROADLEGEND
DAM SITE
VILLAGE
Figure 8.1 : Location of Dumping Site
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 123
The selection of muck disposal sites was carried out considering the quantity of the
muck, landscape, cost effectiveness, nearness to source of generation, absence of
ground and surface water, relief and scope for afforestation works. The details of
dumping sites along with their total capacity and amount of muck to be disposed are
enumerated in Table 8.2.
Table 8.2 : Muck Disposal Site Details
Sl.
No.
Location of Dumping Site Area in
Ha
Capacity
in cum
Remarks
1. D-1, located about 600m d/s of
dam
0.45 45000 The dumped muck shall not
be roller compacted. The
quantity is on swell basis.
2. D-2, located about 500 m v/s of
Pan Nar Nala
1.00 40000 The dumped muck shall be
roller compacted to provide
raised platform for labour
camps.
3. D-3, located about 600m d/s of
Pan Nar Nala
3.15 160000 The dumped muck shall be
roller compacted to provide
raised platform for labour
camps.
4. D-4. located near RD 47km on
Kishtwar –Gulabgarh Road
3.00 270000 The dumped muck shall be
roller compacted to provide
raised platform for labour
camps.
5. D-5, located about 300m v/s of
Shirir Nala
1.20 130000 The dumped muck shall not
be roller compacted. The
quantity is on swell basis.
6. D-6, located about 200m d/s of
Shirir Nala
1.60 150000 The dumped muck shall not
be roller compacted. The
quantity is on swell basis.
7. D-7, located about 250m d/s of
Lidrer Nala
2.45 540000 The dumped muck shall not
be roller compacted.
The quantity is on swell
Basis.
Total
12.85 1335000
8.3. Description on Muck Disposal Sites
8.3.1. Muck Disposal Site D-1
The proposed muck disposal site is located about 600 m d/s of dam axis on left bank
of Chenab on Kishtwar - Gulagarh road. The average dimension of the site is 300 m
x 15 m and with 10 m average height it is capable of holding 45,000 cum of muck
against which 30,000 cum quantity, to be obtained from excavation of dam is
proposed to be dumped. The plan area of the site is 0.45 ha. The general view of the
site is shown in Figure 8.2 and 8.3
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 124
Figure 8.2 : General View of Dumping Site D-1
Figure 8.3 : General View of Dumping Site D-1
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 125
8.3.2. Muck Disposal Site D-2
The proposed muck disposal site is located about 500 m u/s of Pan Nar Nala on left
bank of the Chenab on Kishtwar – Gulabgarh road. The average dimension of the
site is 500 m x 10 m and with 8 m average height it is capable of holding 40,000 cum
of muck against which 35,000 cum, to be obtained from the excavation of dam is
proposed to be dumped and properly roller compacted to provide raised platform for
contactor’s camp. The plan area of the site is 1.00 ha. The general view of the site is
shown in Figure 8.4.
Figure 8.4 : General View of Dumping Site D-2
8.3.3. Muck Disposal Site D-3
The proposed muck disposal site is located about 600 m d/s of Pan Nar Nala on L/B
of the Chenab on Kishtwar – Gulabgarh road. The average dimension of the site is
800 m x 20 m and with 10 m average height it is capable of holding 160,000 cum of
muck against which 1,50,000 cum, to be obtained of dam and intake shall be
dumped and properly roller compacted to provide platform for temporary colony. The
plan area of the site is 3.15 ha. The general view of the site is shown in Figure 8.5
and 8.6
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 126
Figure 8.5 : General View of Dumping Site D-3
Figure 8.6 : General View of Dumping Site D-3
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 127
8.3.4. Muck Disposal Site D-4
The proposed muck disposal site is located on left bank of the Chenab, RD 47 km on
Kishtwar – Gulabgarh road. The average dimension of the site is 600 m x 30 m and
with 15 m average height it is capable of holding 2,70,000 cum of muck against
which 2,60,000 cum, to be obtained of dam and intake shall be dumped and properly
roller compacted to provide platform for temporary colony. The plan area of the site
is 3.0 ha. The general view of the site is shown in Figure 8.7 and 8.8
Figure 8.7 : General View of Dumping Site D-4
Figure 8.8 : General View of Dumping Site D-4
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 128
8.3.5. Muck Disposal Site D-5
The proposed muck disposal site is located about 300 m u/s of Shirir Nala on left
bank of Chenab on Kishtwar - Gulagarh road. The average dimension of the site is
400 m x 30 m and with 15 m average height it is capable of holding 1,30,000 cum of
muck against which 1,10,000 cum quantity, to be obtained from part excavation of
HRT is proposed to be dumped. The plan area of the site is 1.2 ha. The general view
of the site is shown in Figure 8.9.
Figure 8.9 : General View of Dumping Site D-5
8.3.6. Muck Disposal Site D-6
The proposed muck disposal site is located about 200 m d/s of Shirir Nala on left
bank of Chenab on Kishtwar - Gulagarh road. The average dimension of the site is
500 m x 20 m and with 15 m average height it is capable of holding 1,50,000 cum of
muck against which 1,40,000 cum quantity, to be obtained from part excavation of
HRT is proposed to be dumped. The plan area of the site is 1.6 ha. The general view
of the site is shown in Figure 8.10.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 129
Figure 8.10 : General View of Dumping Site D-6
8.3.7. Muck Disposal Site D-7
The proposed muck disposal site is located about 250 m u/s of Lidrer Nala on left
bank of Chenab on Kishtwar - Gulagarh road. The average dimension of the site is
1000 m x 20 m and with 27 m average height it is capable of holding 5,40,000 cum of
muck against which 5,00,494 cum quantity, to be obtained from adits, surge tank,
powerhouse cavern and tail race tunnel is proposed to be dumped. The plan area of
the site is 2.45 ha. The general view of the site is shown in Figure 8.11.
Figure 8.11 : General View of Dumping Site D-7
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 130
8.4. Implementation of Engineering & Biological Measures
As already explained engineering measures like providing of GI wire crates and
retaining walls and compaction of muck will provide stability to the profile of muck
piles.
8.4.1. Engineering Measures
It has been observed that after excavation the disposal of muck creates problem as it
is susceptible to scattering unless the muck disposal yards are supported with
engineering measures such as retaining structures, crate walls and gabions. All the
dumping sites need proper handling to avoid spilling of muck into the river water
while dumping and in the post dumping stages. The muck disposal sites have to be
developed from below the ground level either by providing stone masonry or RCC
retaining wall in height of 6 m on water facing side and 4 m on lateral sides for dump
sites. Proper weep holes with inverted filter behind shall be provided at a spacing of
1.5 m c/c. It is proposed to develop dumping sites into terraces for erecting labour
camps and after completion of work shall be rehabilitated by afforestation. The cost
of engineering measures has however been worked out on the basis of RCC
retaining wall. Besides retaining wall four tiers of inter mediatory boulder wire crates
of 8 SWG wire with 10 cm x 10 cm mesh size and in dimension 2.25 m x 1.25 m x
1.25 m shall be provided with 0.4 m berm width. After placing of first tier of crates at
the toe of muck disposal site, the muck brought in dumpers shall be dumped and
manually spread behind the crates in such a manner that rock mass is properly
stacked behind the crates with minimum of voids.
8.4.2. Biological Measures
Biological measures, however, require special efforts as the muck disposed in
disposal yards will in general be devoid of nutrients and soil contents to support
vegetation. The selection of soil for spreading over such an area would require
nutrient profiling of soil for different base elements. Suitable ad mixture of nutrients
would be done before placing the soil on the top surface of muck disposal areas to
have administered growth of forest canopy.
8.4.2.1 Plantation Technique
In view of the peculiar site conditions particularly the soil conditions, the planting
technique for all the categories of the plants has to be very site specific and suited to
the stress conditions as anticipated and discussed above. The planting substrates
would need to be considerably improved to support the plants in their initial stages of
establishment. The moisture retention capability, availability of nutrients and soil
aeration, permeability and porosity would require intervention and assistance.
Multistoried and multipurpose plantations are proposed to be raised on the muck
dumping sites as also in road side strips using grasses, shrubs and bushes in the
under storey and trees in the upper storey. Nursery raised grass slips, seedlings of
shrubs & bushes and tree species would be planted in the area combined with grass
sowing in patches. In addition, cuttings of bushes and shrubs can also be planted to
supplement the nursery raised stock but this would substitute requirement of raising
the nursery of these species. Intimate mixture of species would be avoided right at
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 131
the planning stage and would be strictly followed during planting. Each patch should
contain maximum of two species. Grasses would be mixed by groups in rows, shrubs
and bushes by group again in rows.
Grass slip planting and grass seed sowing would be done in strips at 0.10 m x 0.10
m spacing in the prepared staggered patches of 1 m x 0.5 m with a depth of 0.30 m.
Soil mixture would be used while filling the patches. Balance dug up soil/muck will be
stacked along the patch on the downhill side for rain water tapping and enhanced
percolation in the patch. Number of such patches in each hectare is proposed at 500.
Shrubs and bushes would be planted in elongated strips of 1.5 m x 0.5 m with a
depth of 0.45m. Soil mixture would be used while filling the patches. Balance dug up
soil/muck will be stacked along the patch on the downhill side for water tapping and
better percolation in the patch. These would be staggered throughout the area
numbering 500 per hectare. Each patch would have two rows of planting with
staggered spacing between plants in a row as 15 cm and distance between rows as
15 cm.
Planting of trees would be done in contour staggered pits of 0.60 m x 0.60 m x 0.60
m size numbering 800 per hectare. Out of these 800 plants, about 200 plants per
hectare are meant for planting along the periphery of the area. If the periphery gets
filled up with lesser numbers, the remainder would be planted in the core/main area.
Soil mixture would be used while filling the pits. Balance dug up soil/muck will be
stacked on downhill side of the pit for trapping the rain water and allowing it to
percolate in the pit.
It is proposed to use soil mixture in the pits & patches consisting of soil imported
from nearby areas mixed with compost or human or vermin-compost or all of these.
The ratio for the mix would be 5 parts: Compost/manure 2 parts: Sand 2 part: and
humus or vermin-compost 1 part. This will make nutrients really available for the
plants in the preliminary stages and also help increase soil aeration, porosity &
permeability and improved moisture available for the plants.
The stabilization sites from the time of execution of biological measures would be
protected with barbed wire fencing on 2m high RCC posts and provided with
inspection paths. Since the muck dumping sites are being provided with either RCC
walls or the wire crate (gabion) wall on the valley side (towards river) which is not
negotiable by animals and human beings, fencing would not be required along the
entire perimeter. Hence, it would be done on the vulnerable sections i.e. towards the
hillside only.
The proposed costs include nursery costs for initial planting and also for mortality
replacement.
The biological measures shall be taken up towards the end of construction. The
plantations would be maintained for a period of 5 years by irrigating the plantation
during dry seasons, mortality replacement and repair of fencing & inspection paths
within the area. The task of irrigation would be performed by the watch & ward
provided in the cost estimate.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 132
Although the sites would be either leveled or finished in a grade, yet due to rains and
sliding etc, they tend to develop rills and gulley causing acceleration in the rate of
erosion. As such, while carrying out plantation; suitable soil conservation measures
would also be taken.
8.5. Species for Plantation
Afforestation with suitable plant species of high ecological and economic value and
adaptable to local conditions will be undertaken at the rate of 800 plants per hectare
in accordance with canopy cover requirement. The major plant species which can be
used in the area are given in Table 8.3.
Table 8.3 : Name of the Plant Species
Botanical Name Local Name
Alnus nitida Kosh, Kunish, Nyun
Betula utilis Bhojpatra, Pad
Cedrus deodara Kelo, Diar, Kialmang
Cupressus torulosa Devidiar
Juniperus macropoda Guggal, Dhup, Shur
Pinus gerardiana Neoza, Chilagoza, Ri
Prunus armeniaca Chuli, Chul
Juglans regia Akhrot
Prunus cornuta Krun, Birdcherry
Pinus wallichiana Kail
Fraxinus xanthoxyloides Thumb
Populus ciliata Kramal
Salix alba Shon
Besides, the above tree species, the shrub species identified for plantations are;
Cotoneaster bacillaris, Colutea nepalensis, Elaeagnus umbellata, Spiraea canescens
and Rosa webbiana.
8.6. Cost Estimate for Muck Disposal Plan
The cost estimate for muck disposal plan indicating engineering, biological, bio-
technological measures and maintenance is provided in Table 8.4.
Table 8.4 : Cost Estimate for Muck Disposal Plan indicating Engineering, Biological, Bio-Technological Measures and Maintenance
Sl.
No.
Particulars Quantity Unit Rate
(Rs.)
Amount
(Rs. In lac)
A. Engineering Measures
1(a)
(i)
RCC retaining wall 6m height for retaining
muck at disposal site D-1, D-2, D-3, D-4, D-
5, D-6 and D-7 in total length of 3600m
Cement Concrete M:20
Base:3600x0.40x3.60=5184
Stem:3600x5.6x0.33=6653
11837
Cu. M
6136
726.32
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 133
Cost of Steel reinforcement
465
Mt
53499
248.77
1(b)
(i)
(ii)
RCC retaining wall 4m height for retaining
muck at side of disposal sits D-1, D-2, D-3,
D-4, D-5, D-6 and D-7 in total length 2
(15+20+45+50+30+40+35) i.e. 470 RM
Cement Concentrate M:20
Base: 470x0.3x2.50=352.50
stam: 470x3.7x0.26=452.14
Cost of Steel reinforcement
805
32
Cu. M
Mt
4000
55000
49.40
17.12
2 Supplying and placing in position GI wire
crate 8 SWG, 10 cm as inter mediatory
support in 4 tiers of crates (2.25m x 1.25 m x
1.25m) on dumping site D-3, D-4 and D-7 in
540, 790 and 770 i.e. total 3740numbers
3740
No.
3000
112.20
Subtotal (A) 1153.81
B. Biological Measures
1. Plantation of muck disposal sites 12.85 Ha 485432 62.37
2. Barbed wire fencing on 2m high RCC posts 12.85 Ha 30000 3.86
3. Cost of portable pump with accessories 3 No. 150000 4.50
4. Cost of sprinkler system of irrigation 12.85 Ha 25000 3.21
5. Watch and ward 3 no. @ Rs. 6000 p.m. for 5
years
180 Man
month
6000 10.80
Subtotal (B) 84.74
Grand Total (A) + (B) 1238.55
say Rs.
1239.00
Lac
8.7. Cost Model for Plantation
The cost model for plantation on muck dumping sites is given in Table 8.5.
Table 8.5 : Cost Model for Plantation on Muck Dumping Sites (For One Hectare Area)
S. No.
Particular Qty. Unit Rate (Rs.)
Amount (Rs.)
A. PALANTATION:
(1) GRASS SLIP PLANTING AND GRASS SEED SOWING:
1 Preparation of soil mixture (soil, sand, humus & compost) including digging, purchase, carriage to the site of work and mixing at site.
75.00 Cum. 850.00 63750
2 Digging of staggered patches 1 m x 0.50 m x 0.30 m @ 500 patches/ha.
75.00 Cum. 50.00 3750
3 Filling of staggered patches with imported soil mixture.
75.00 Cum. 15.00 1125
4 Extraction of grass slips from nursery beds @ 50 slips per patch.
25000 Per Slip 0.12 3000
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 134
5 Carriage of grass slips from nursery to work site.
25000 Per Slip 0.15 3750
6 Planting of the extracted grass slips in above patches @ 50 slips per patch.
25000 Per Slip 0.18 4500
7 Cost of grass slips (in nursery). 25000 Per Slip 0.5 12500
8 Purchase of grass seeds @ 5 gm. Per patch.
2.50 Kg. 115.00 288
9 Sowing of grass seeds in furrows in each patch.
500 Patch. 2.50 1250
TOTAL 93913
(II) SHRUBS AND BUSHES PLANTATION:
1 Preparation of soil mixture (soil, sand, humus & compost) including digging, purchase, carriage to the site of work and mixing at site.
168.75 Cum. 850.00 143438
2 Digging of elongated patches 1.5 x 0.50 m x 0.45 m @ 500 patches/ha.
168.75 Cum. 50.00 8438
3 Filling of elongated patches with imported soil mixture.
168.75 Cum. 15.00 2531
4 Extraction of shrubs & bushes from nursery beds @ 50 per patch.
25000 Per plant 0.15 3750
5 Carriage of shrubs & bushes from nursery to work site.
25000 Per plant 0.15 3750
6 Planting of the extracted shrubs & bushes un above patches @ 50 per patch.
25000 Per plant 0.20 5000
7 Cost of shrubs & bushes (in nursery). 25000 Per plant 1.00 25000
TOATL 191906
(III) FOUR LINE STRIP PLANTATION (TREE SPECIES):
1 Preparation of soil mixture (soil, sand, humus & compost) including digging, purchase, carriage to the site of work and mixing at site.
18.225 Cum. 850.00 15491
2 Digging of pits (45cm x 45cm x 45cm) in periphery of area.
200 No. 4.45 890
3 Filling of pits (45cm x 45cm x 45 cm) with imported soil mixture.
200 No. 1.27 254
4 Extracted of plants from nursery beds. 200 No. 0.25 50
5 Carriage of plants from nursery to the work site over average distance of 10 km uphill carriage.
200 Nos. per Km.
0.17 340
6 Planting of extracted plants in above pits including ramming.
200 No. 0.86 172
7 Mulching of plants with grass. 200 No. 0.28 56
8 Cost of plants (in nursery). 200 No. 1.00 200
TOTAL 17453
(IV) PLANTATION OF TREE SPECIES IN BLANK AREA:
1 Preparation of soil mixture (soil, sand, humus & compost) including digging, purchase, carriage to the site of work and mixing at site
54.675. Cum. 850.00 46474
2 Digging of pits (45cm x 45cm x 45cm) for B/L plantation.
600 No. 4.45 2670
3 Filling of pits (45cm x 45cm x 45cm) for B/L plantation with imported soil mixture.
600 No. 1.27 762
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 135
4 Extraction of plants from nursery beds. 600 No. 0.25 150
5 Carriage of plants from nursery to the work site over an average distance of 10 Km uphill carriage.
600 No. per Km. 0.17 1020
6 Planting of B/L plants in pits including ramming.
600 No. 0.86 516
7 Mulching of B/L plants with grass. 600 No. 0.28 168
8 Cost of plants (in nursery). 600 No. 4.00 2400
TOTAL 54160
(V) MAINTENANCE:
1 1st year maintenance. 1 Ha. 4000 4000
2 2nd year maintenance. 1 Ha. 3600 3600
3 3rd year maintenance. 1 Ha. 3200 3200
4 4th year maintenance. 1 Ha. 2800 2800
5 5th year maintenance. 1 Ha. 2000 2000
6 Watch and ward of plantation for 5 years (60 months @ 1000/=) including irrigation during lean seasons.
1 Ha. 1000 60000
TOTAL 78000
B. SOIL CONSERVATION:
1. Construction of gulley plugs, small check walls/dams etc. LUMP-SUM
50000
TOTAL (A) + (B)
GRAND TOTAL 4,85,432
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 136
9. RESTORATION PLAN FOR QUARRY SITES
9.1. General
The Kirthai HEP, Stage-II mainly involves construction of diversion dam, intake
structure, inlet tunnels, desilting chamber, flushing ducts, head race tunnel,
underground and auxiliary powerhouse and transformer hall, main access tunnel, tail
race tunnel and other adits and tunnels. For the construction of such components
huge quantities of concrete work, structural steel work, shotcreting and grouting and
fixing of pre-cast lagging is involved for which construction materials like coarse and
fine aggregates, boulders, stones and earth for backfilling are required besides
cement, structural steel and reinforcement steel. The quantities of construction
material like fine aggregate, single or coarse aggregate filter material, backfill earth
for various uses and their potential quarry/mining sites are mentioned in Table 9.1.
Table 9.1 : Quantity of Various Materials
S. No
Material Quantity (lac m3)
Quarry/ Mining Sites
1 Fine aggregate for c.c 10.38 In situ Rock quarry sites Q-1 & Q-2 after crushing of rock mass.
2 Coarse aggregate 20.76 In situ Rock quarry sites Q-1 & Q-2 and from excavation of under ground works.
3. Rock fill material 1.64 From excavation of diversion tunnel and bank stripping of dam.
4. Graded filter material for coffer dam
0.22 River shoal deposits, Q-3.
5. Impervious material 0.30 Borrow area in Atholi Village.
Total 33.30
Excavation of construction material entails land acquisition and management of
quarry areas at a later date to maintain the environment in its natural state.
Therefore, during material survey/investigation it was realized that the quarry areas
may be identified in river plain as far as possible and also the material excavated
from different components be utilized. In view of this, one site d/s of dam for filter
material and two in-situ rock quarries have been identified.
9.2. Details of Quarry Sites
In construction of the project, about 33.30 lac cum material comprising of
aggregate/stone, filter material and rock fill material and clay, shall be required. To
meet this demand stream/river bed shoals in and around River Chenab were
investigated. It is also proposed that the excavated material derived from the
underground and open surface works will be utilized and about 3,007,765 cum
excavated material will therefore, be used out of the total quantity of 4296808 cum
excavated material. The coarse aggregate obtained through crushing of excavated
muck shall be utilized in non-wearing concrete works like back fill concrete in water
conductor system like HRT, pressure shaft, MAT, TRT and other adits and also in
shotcreting and grouting works. The lining and structural concrete shall be made from
aggregates obtained from in-situ rock quarry located u/s of Lidrari Nala and also from
in-situ rock quarry located between 2.2 to 2.6 km d/s of Kirthai HEP Stage - II dam on
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 137
Kishtwar Gulabgarh road. Assuming the total losses (30%) to be accounted for in the
quantity estimation of raw material from quarry site to aggregate processing plant for
producing aggregates, the total quantity of raw material works out to be 26.99 lac
cum and that for production of crushed sand about 13.49 lac cum. Thus, in case of
use of crushed sand the total raw material requirement comes to 40.38 lac cum
which shall be met from utilization of 30.08 cum of muck and balance 10.30 lac cum
from in-situ rock quarries. The location plan of the quarry/mining sites is depicted in
Figure 9.1 and details of different kind of material and quarry areas are described
below.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 138
HACHOT FOREST
Dhurku
iS
hurku
i N
Chanas
Chauki
Open Scurb
RutanaKuheg N
KUGON FOREST
Phulin
SHIMPAN
SHASHO R H
Pan N
ar
SHIRIR FOREST
SHIRIR
kidur
N
KIDURIamur Puhali
Dense mixed jungle
K a
t s
a r
D
h a
rL id
rer
N
Rel G
ad
DANDWAR FOREST
Talatun Puholi
Sen Puhali
Kara
na N
a
CHANDRA BHAGA OR GADOR R
BODARBAN FOREST
Sunga
la N
WUCHIR FOREST
Dense mixed jungle
Dense mixed jungle
Dense mixed jungle
Rotdhar Puhali
KOL
Charwas Puhali
Diaban PuhaliSungul
SORA FOREST
Kahot Puhali
Somot Puhali
Nagariun
GulabgarMat
Arthal
Kundal
P OHuga
Lauj
LAUJ FOREST
kota
rur
Rawhar Puhali
BHETAL BUZAR FOREST
Aphani N
Hahswa
Kijai
Aphani
KirthaiZar
Kadhel
Muth
a Na
Rope Bridge
Laie
Nalhoran
Her Pass
Khatasar Puhali
Gwardhar Puhali
DAM SITE
N
Q-2
Q-1
Q-3
LOCATION MAP OF QUARRY SITE
0 1 2KMScale
CONTOUR
RIVER
ROADLEGEND
DAM SITE
VILLAGE
Figure 9.1 : Location Plan of the Quarry/Mining Sites
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 139
9.2.2. Quarry Site, Q-1
It is in situ rock quarry located on left bank of Chenab and Left bank of Lidrer Nala
d/s of bridge on Lidrari Nala, on Kisthwar - Gulabgarh road. The quarry lies in forest
and about 6 km d/s of dam site. Assuming the proposed quarry dimension of 250 m x
95 m and with 30 m height of excavation on a hill slope of 600, the quarry shall yield
about 6 lac cum of blasted material which is mainly gneiss. The CSMRS, New Delhi
who have conducted field and laboratory investigations for samples from the site
have found the rocks from the quarry suitable for use as coarse aggregate as well as
crushed fine aggregate in concrete for non-wearing surface. The plan area required
for quarry shall be 2.5 ha. The general view of the site is shown in Figure 9.2.
Figure 9.2 : The General View of the Quarry Site Q-1
9.2.3. Quarry Site, Q-2
It is in situ rock quarry located on left bank of Chenab about 2.2 km d/s of dam site
and is located on Kisthwar - Gulabgarh road. Assuming the proposed quarry
dimension of 300 m x 75 m and with 30 m height of excavation on a hill slope of 600,
the quarry shall yield about 6 lac cum of blasted material which is mainly gneiss. The
CSMRS, New Delhi who have conducted field and laboratory investigations for
samples from the site have found the rocks from the quarry suitable for use as
coarse aggregate as well as crushed fine aggregate in concrete for non-wearing
surface. The plan area required for quarry shall be 2.5 ha and it shall be near to the
dam site. The general view of the site is shown in Figure 9.3 and Figure 9.4.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 140
Figure 9.3 : The General View of the Quarry Site Q-2
Figure 9.4 : The General View of the Quarry Site Q-2
9.2.4. Quarry Site, Q-3
The quarry site is a shoal deposit in the Chenab, located about 6.8 km from
Gulabgarh on left bank of Chenab. The site is closed to Aphani Nala. The quarry
area involves 1.0 ha Government land. Assuming average mining in 3.0 m depth, it
shall yield about 0.3 lac cum material involving boulder, shingle and sand of different
grades which can meet the requirement of graded filter material required in the core
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 141
and bottom of the two coffer dams. The general view of the quarry is presented in
Figure 9.5.
Figure 9.5 : The General View of the Quarry Site Q-3
9.2.5. Clay Borrow Area
For meeting the requirement of 0.3 lac cum of the clay core material, some borrow
area is to be delineated by the project proponent on the basis of the analysis of
samples to be taken from pits to be made in agriculture area under Atholi villages.
9.3. Environmental Impacts
The environmental impacts of excavation of construction materials such as rock
mass/boulder and sand for construction of hydroelectric projects depend on
excavation process, local hydrological conditions, climate, rock types, size and type
of operations and topography. Impacts also vary with stage of development at quarry
sites e.g. development of working platforms has a less impact compared to the
excavation of aggregates and sand. Physical changes in the soil, water and air
associated with environment impacts would be due to excavation and degradation of
land around the quarry and on biota around it. About 70% excavated material from
surface and the proposed underground works shall be utilized together with river bed
materials obtained from 1 river bed quarry and two other rock quarries. The rock face
areas of rock quarries do not require any major restoration measures. However,
keeping in view the fact that due to blasting etc. the rock features along the joint
surfaces may get weak or disturbed, for overcoming which some rock bolting and
shotcrete measures along the exposed face are proposed. The river shoal area fall in
the river bed/plain, as such no restoration measures are proposed for them. The river
shoal quarry sites will be restored during the flood season as this fall within the river
course of River Chenab. Therefore, the river bed quarry activity shall not lead to any
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 142
negative impact either during the functioning of the quarry or at a later date. Quarry
site No. 3 shall be submerged in the pond and thus need no restoration. Blasting
shall not be allowed in the river bed. Copious use of sprinkler shall be resorted to
stock piles of aggregate and the washing of the aggregate shall be first allowed to
settle in the setting tanks before disposing into river. As a dust arrester G.C sheet
shield shall be erected on the valley side of portion of Kishtwar – Gulabgarh road.
9.4. Treatment Measures for Restoration
The biological and engineering measures are proposed to be implemented for
restoration of rock quarry Q-1 & Q-2.
9.4.1. Biological Measures
Under the biological measures, plantation over an area of 12 ha as per the suitability
of the area will be conducted to bring the diverted area under rock quarry No. 1 & 2
under forest cover after these are no more needed. In addition to plantation, seeding
of local plant species will also be done to enhance natural regeneration. The
plantation technique and the rate of plantation shall be as in the case of biological
treatment of muck disposal sites.
9.4.2. Barbed Wire Fencing
The area of rock quarry site will be fenced first to ward off animals from entering the
quarry area and later to protect the plantation from grazing and to enhance natural
regeneration.
9.4.3. Engineering Measures
For the reclamation of the quarry sites, the following engineering measures are
proposed.
9.4.3.1 Protective Shield
Along 2000 m length of the Kirthai - Gulabgarh road near quarry site Q-1, Q-2 & Q-3
proper G. C. Sheet Shielding shall be erected to safeguard against fugitive dust
particles.
9.5. Cost Estimate for Restoration of Borrow Areas
The details of the expenditure likely to be incurred on the implementation of
biological and engineering measures to be adopted are placed in Table 9.2.
Table 9.2 : Cost estimates for restoration of borrow areas
SI.
No.
Item of Work Qty. Unit Rate
(Rs.)
Amount
(Rs. in
lac)
1 Stone masonry (1:6) in
retaining wall of 4 m height
in 75 m
300 Cum 3000 9.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 143
SI.
No.
Item of Work Qty. Unit Rate
(Rs.)
Amount
(Rs. in
lac)
2 Plantation in 5 ha. Including
maintenance for 5 years.
5.0 ha 250000 12.50
3 Watch and ward 3 No
Chowkiders @ Rs 10000
p.m for 5 years
180 months 10000 18.00
4 Provision for Settling Tanks Job LS 5.50
5 Providing G.C. Sheet shield in
500 m length.
500 Rm 2000 10.00
6 For execution of eco-
friendly management plan
for 3 nos. quarry area
Job LS 30.00
Total 85.00
9.6. Landscape and Restoration Plan
Kirthai HEP, Stage-I encompassing a diversion dam, underground water conductor
system and powerhouse is located in the interior area of Paddar block of District
Kishtwar. Being in remote interior and at a detour from District Headquarter,
Kishtwar, the dam site on rock outcrop provides a limited site for landscaping
besides being in deep gorge too. The water conductor system, the powerhouse and
appurtenant works are all underground structures and thus their landscaping is not
warranted. Considering this the landscape plan is restrictive in nature being limited to
dam site, residential and office complex areas. Provision in DPR, for development of
garden, parks and lawns in the residential areas/office complexes under the head M-
Plantation should be earmarked in the DPR. It is proposed to provide landscaping for
the area around dam complex. The financial provision of landscape works is
presented in Table 9.3.
Table 9.3 : Cost Estimate for Landscaping Plan
S. No Particular Quantity Amount
(Rs in lac)
1 Providing two view points on Kishtwar-Pangi road, one near
exit point of Tail race and the other at a suitable location on
road.
LS 5.00
2 Providing Channel fencing along approach road to dam LS 10.00
3 Providing ornamental, avenue and flowering plants and
flower beds near left bank of dam
LS 4.00
4 Providing rest benches LS 1.00
5 Providing for lighting arrangements to enhance the night
effect
LS 5.00
6 Watch and ward LS 5.00
7 Provision for recurring cost on maintenance of item 1 through
5 @ 2.5% of cost per year for 5 years
LS 1.25
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 144
8 Provision for meeting electricity Charges @ Rs 1.5 lacs per
year for 5 years.
LS 7.50
9 Contingencies LS 1.00
Total 39.75
Say 40.00
Therefore, the overall cost of Restoration of Quarry area and landscaping plan is Rs. 85
lakh + Rs. 40 Lakh = Rs. 125 lakh
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 145
10. DISASTER MANAGEMENT PLAN
10.1. Introduction
Any hydroelectric project if not designed on the sound principles of design after detail
investigations in respect of hydrology, geology, seismicity etc., could spell a large-
scale calamity. Thus, these are inherent risk to the project like improper
investigation, planning, designing and construction which ultimately lead to human
catastrophe. Though through detailed field investigations it has been ensured that
the dam is founded on firm foundation, designed for suitable seismic design
parameters and the spillway has been designed for passing 9600 cumecs discharge,
yet in view of that uncertain element of “Force majeure” the eventuality of a disaster
cannot be ignored but a rescue plan must be devised for confronting such an
exigency without being caught in the vast realm of unpreparedness.
A disaster is an unwarranted, untoward and emergent situation that culminates into
heavy toll of life and property and is a calamity sometimes caused by “force majeure”
and by human error. The identification of all types of disaster in any proposed project
scenario involves the critical review of the project vis-à-vis the study of historical past
incidents/disasters in the similar situations. The evolution of disaster management
plan dwells on various aspects such as provision of evacuation paths, setting up of
alarms and warning systems, establishing communicating system besides
delineating an Emergency Response Organization with an Effective Response
System. Keeping in view the grievous affects a disaster can cause on human or
animal population, loss of property and environment in and around the areas of
impact. Therefore, it is essential to assess the possibility of such failures in context to
the present project and formulate a contingent plan.
The proposed diversion dam of Kirthai HEP, Stage-II on the Chenab. The 219.8 m
long dam comprises of 126.8 m non-overflow section and 93 m overflow section. The
crest elevation of spillway has been kept at El. 1712.5 masl, while FRL is at El. 1764
masl and the dam foundation level (lowest) shall be kept at 1650 masl. The FRL and
MDDL have been fixed at El. 1764 masl and 1750.75 masl respectively.
The project is R-O-R scheme and thus has very small live storage of 17.0 MCM only.
The pond level shall fluctuate according to peak power generation. On the u/s of the
project, Kirthai I HEP, has also been conceived and on the d/s of the project Kiru
HEP is proposed. Therefore, a comprehensive monitoring network system has to be
established to combat jointly the threat due to failure of any of these schemes. For
accomplishing this full proof “no communication failure” system has to be evolved.
10.2. Model For Dam Break Analysis
For reasons of simplicity, generally, wide applicability and the uncertainty in the
actual mechanism, the BOSS DAMBRK model has been used. The model uses
failure time interval, terminal size and shape of the breach as the inputs. The
possible shapes of the breach that can be accomplished by the model are
rectangular, triangular and trapezoidal. The model can adopt either storage routing
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 146
or dynamic routing methods for routing floods through reservoirs depending on the
nature of flood wave movement in reservoirs at the time failure.
The dynamic wave method based on the complete equations of unsteady flow is the
appropriate technique to route the flood hydrograph through the downstream valley.
The method is derived from the original equations developed by St. Venant. The
model uses St. Venant’s equations for routing dam break floods in channels.
10.3. Methodology
The National Weather Service’s DAMBRK model developed by Dr. L. Fread has
been used in the study. This model simulates the failure of dam, computes the
resultant outflow hydrograph and simulates movement of the dam break flood wave
through the downstream river valley. The model is built around three major
capabilities, which are reservoir routing, breach simulation and river routing.
However, it does no rainfall-runoff analysis and storm inflow hydrographs to the
upstream of reservoir must be developed external to the model. A brief description of
the capabilities of the model is described in the following paragraphs
Reservoir Routing
The storage routing is based on the law of conservation given as:
I –Q = dS/dt …………………….….. (1) in which, I is reservoir inflow. Q is the total reservoir outflow which includes the flow
spillway, breach, overtopping flow and head independent discharge, and rate of
change of reservoir storage volume. Equation (1) can be expressed in finite
difference form as:
(1 + I’ ) 2 - (Q + Q’ )/2 = ∆ S/∆t -.-----(2)
in which the prime (‘ ) superscript denotes the values at the time t - ∆t and the
notation approximates the differential. The term ∆S may be expressed as:
∆S = (As +A’s) (h-h’)/2 ……………… (3)
In which, As is the reservoir surface area coincidental with the elevation (h) and is a
function of h. The discharge Q which is to be evaluated from equation (2) is a
function of h and this known h is evaluated using Newton–Raphsoniteration
technique and thus the estimation of discharge corresponding to h.
Dynamic Routing
The hydrologic storage routing technique, expressed by equation (2) implies that the
water surface elevation within the reservoir is horizontal. This assumption is quite
adequate for gradually occurring breaches with no substantial reservoir inflow
hydrographs. However, when the breach is specified to form almost instantaneously
to produce a negative wave within the reservoir, and/or the reservoir inflow
hydrograph is significant enough to produce a positive wave progressing through the
reservoir, a routing option which simulates the negative and /or positive wave
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 147
occurring within the reservoir may be used in DAMBRK model. Such a technique is
referred to as dynamic routing. The routing principle is same as dynamic routing in
river reaches and it is performed using St. Venant’s equation. The movement of the
dam break flood wave through the downstream river channel is simulated using the
complete unsteady flow equations for one dimensional open channel flow,
alternatively known as St. Venant’s equations. These equations consist of the
continuity equation
∂Q ∂(A +A0)
___+ _______ = q ………………………………… (4)
∂t ∂t
and the conservation of momentum equation:
∂Q ∂(A2/ +A) ∂h
___+ _______ + g A ( ---- + Sf +S e) + Lc = 0 ……(5)
∂t ∂t ∂t
where,
A = active cross – sectional flow area
A0 = inactive (off-channel storage) cross – sectional area
X = distance the channel
q = lateral inflow or outflow per unit distance along the channel
g = acceleration due to gravity
Q = discharge
H = water surface elevation
Ss = friction slope
Se = expansion – contraction loss slope
Lc = lateral inflow/outflow momentum effect due to assumed flow path of
inflow being perpendicular to the main flow
The friction slope and expansion – contraction loss slope are evaluated by the
following equation
n3 Q2
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 148
Sf = --------------- ……………………….…….(6)
2.21 A2 R¾
and,
K∆(Q/A)2
Se = -------------------- ……………………………….……. (7)
2g ∆ X
where,
n = Manning’s roughness coefficient
R = A/B where B is the top width of the active portion of the channel
K = Expansion – contraction coefficient varying from 0.1 to 0.3 for
contraction and 0.5 to – 1.0 expansion ‘
∆(Q/A)2 = Difference in (Q/A)2 for cross sections at their end of a reach
The non-linear partial differential equations (4) and (5) are represented by a
corresponding set of non-linear finite difference algebraic equations and they are
solved by the Newton – Raphson method using weighted four-point implicit scheme
to evaluate Q and h. The initial conditions are given by known steady discharge at
the dam, for which steady state non-uniform boundary flow equation are used. The
outflow hydrograph from the reservoir is the upstream boundary condition for the
channel routing and the model can deal with fully supercritical flow or fully
supercritical flow in the reach or the upstream reach having supercritical flow and
downstream reach having subs critical flow. There is a choice of downstream
boundary conditions such as internally calculated loop rating curve, user provided
single valued rating curve, user provided time dependent water surface elevation,
critical depth and dam which may pass flow via spillways, overtopping and/ or
breaching.
10.4. Statement Of The Problem
The computation of flood wave resulting from a dam breach basically involves two
scenarios which can be considered jointly or separately: (1) the outflow hydrograph
from the pond (2) the routing of the flood wave downstream from the breached dam
along the river valley and the flood plain. If breach outflow is independent of
downstream conditions, or if their effect can be neglected, the reservoir outflow
hydrograph is referred to as the free outflow hydrograph. In this case, the
computation of the flood characteristics is divided into two distinct phases: (a) the
determination of outflow hydrograph with or without the routing of the negative wave
the reservoir, and (b) the routing of flood wave downstream from the breached dam.
In this study the problem of simulating the failure of “Dam” and computing the free
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 149
outflow hydrograph from the breached section using storage routing technique’ with
the aim of reproducing the maximum water level marks reached during the passage
of flood wave is considered. The information regarding inflow hydrograph into the
pond due to the storm at the time of failure, the structural and the hydraulic
characteristics details of the dam, the time of failure, the channel cross sections
details, the maximum water level marks reached in the reservoir at the time of failure
and those observed in the downstream reach of the dam to the passage of flood
wave etc. are available for the study.
10.5. Availability Of Data
The input data required for the U.S. National Weather Service’s BOSS DAMBRK
model can be categorized into two groups. The first data group pertains to the dam
and inflow hydrograph into the reservoir and the second group pertains to the routing
of the outflow hydrograph through the downstream valley. These are described in the
following paragraphs.
First Data Group Regarding the data group pertaining to the dam, the information on reservoir
elevation-volume relationship, spillway details, elevation of bottom and top of Dam,
elevation of water surface in the reservoir at the beginning of analysis and at the time
of failure, breach description data are required. The particulars of the data used
under each of the above-mentioned categories are given in Annexure-I. In the
present case breach formation time, has been assumed as 0.5 hour.
Second Data Group The second group of data pertaining to the routing of the outflow hydrograph through
the downstream valley consists of a description of cross-sections, hydraulic
resistance coefficients of the reach, steady state flow in the river at the beginning of
the simulation and downstream boundary condition. The cross section is specified by
location mileage, and tables of top width and corresponding elevation. In this study,
five cross sectionals have been used. 3 cross-sections are located at 0, 5 and 15km
respectively from the Dam.
10.6. Result And Conclusions
The maximum stage elevation and maximum flow at different cross-section at
various distances downstream of the Dam is shown in Table 14.1.
Table 14.1: Flood Crest Summary
Cross Section
Location (km)
Maximum Stage
Elevation (m MSL)
Maximum Flow
(cms)
Time To Maximum
Stage (hr)
Maximum Flow
Velocity (m/sec)
0.00 1766.52 56772 0.03 5.75
5.00 1631.21 56772 0.50 19.79
5.50 1620.19 55838 0.50 17.62
6.00 1609.32 54871 0.50 17.74
6.50 1598.49 53894 0.50 17.81
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 150
7.00 1587.88 53068 0.53 17.85
7.50 1577.25 52800 0.53 17.88
8.00 1566.60 52390 0.53 17.89
8.50 1555.94 51870 0.53 17.92
9.00 1545.36 51270 0.55 17.96
9.50 1534.80 51113 0.55 17.99
10.00 1524.22 50847 0.55 18.01
10.50 1513.62 50486 0.55 18.05
11.00 1503.07 50044 0.58 18.09
11.50 1492.55 49868 0.58 18.13
12.00 1482.02 49680 0.58 18.15
12.50 1471.47 49412 0.58 18.20
13.00 1460.93 49071 0.60 18.24
13.50 1450.45 48860 0.60 18.28
14.00 1439.95 48727 0.60 18.31
14.50 1429.44 48524 0.60 18.36
15.00 1418.92 48257 0.60 18.41
It can be inferred from the result that maximum flow 56772 cumec corresponding to
maximum stage elevation 1766.52 masl has been achieved due to breach at km.
0.00 d/s of Dam and thereafter the maximum flow has gradually attenuated to 48257
cumec at Km 15 corresponding to maximum stage 1418.92. This is because for
reaches further downstream from Dam axis, the flow wave characteristics may be
predominantly influenced by channel geometry. The combined outflow hydrograph
and stage elevation plot curve due the simulation of Dam Break are shown in Figure
14.1 and 14.2
The Dam break study has been carried out if the 35-m width of the spill way gets
washed away with breach bottom EL at 1650 masl, The failure is also assumed to
occur when the Dam receives design flood of 9600 cumec.
The following conclusions could be drawn:
1. Failure of the diversion Dam like the proposed Kirthai - I Dam, which is designed to
the present technical standards and built with adequate quality control, is a very-very
remote possibility
2. Failure of the diversion Dam like the proposed Kirthai - I Dam, which is designed to
the present technical standards and built with adequate quality control, is a very-very
remote possibility.
3. The assumed condition that bays of spillway get washed away is only Hypothetical.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 151
Figure 10.1 Combined Discharge Outflow hydrograph
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 152
Figure 10.2 Combined Stage Hydrograph
10.7. Disaster Management Plan
The emergency planning for dam break scenario is devised on the basis of results of
dam break analysis mainly the travel time of flood wave to various locations in the
downstream stretch of the river. It is inferred form the analysis that in case of main
dam failure the flood peak discharge as it prorogates through valley shall inundate
downstream stretch of five km within 30 minutes but in this reach no settlement shall
be affected due to crash flood from dam due to its breaking. In view of the fact that
even upto 15 km d/s of the dam, no settlement is very near to the river there is no
risk of flooding of the settlements. Thus, due to the breaking of the dam the major
risk shall be to the persons who have for some reason or the other has entered the
river bed / plain. The plan is, therefore, based on such measures, which are purely
preventive in nature.
The flood period during monsoon generally is reckoned from June with the onset of
monsoon and ends with withdrawal of south-west monsoon by the end of
September. Before the onset of monsoon all hydro-mechanical equipments,
electrical gadgets, captive power plant and public announcement and communication
system should be kept in perfect readiness. The degree of alertness has to enhance
during high stage of river manifested with sharp increase in discharge. Though there
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 153
cannot be very sharp edge demarcation between different levels of emergency yet
the following flood conditions have been contemplated and the preventive measures
suggested against each as given in Table 10.1.
Table 10.1 : Status of Emergency
S.
No.
Status of
emergency Water Level Preventive measures
1. Normal Flood Below FRL i.e. EL 1764
masl and flood discharge
below 9600 Cumecs
Utmost vigil observed in regulation of
spillway gates
2. Level –1
Emergency
Rises above EL 1764
masl but below EL 1766
masl
(1) All gates fully operational
(2) All the official should attend dam
site. Local officials informed and
warning system be kept on alert.
Communication & public announcement
system should be put into operation and
flood warning issued to people
3. Level –3
Emergency
Top of dam i.e. EL 1766
masl
(1) All staff from dam site, power house
& TRT outlets alerted to move to safer
places
(2) Possibility of dam failure should be
flashed to District Administration.
4. Disaster Rising above EL 1766
masl and the breach
appears in any form
District Administration and Project
authorities be intimated and only life
saving measures should be resorted too
10.7.2. Dam Safety and Maintenance Manual
Based on standard recommended guidelines for the safety inspection of dams a
manual should be prepared by the project proponents in respect of dam safety
surveillance and monitoring aspects. This should be updated with the availability of
instrumentation data and observation data with periodical review. The need for
greater vigil has to be emphasized during first reservoir impoundment and first few
years of operation. The manual should also delve on the routine maintenance
schedule of all hydro-mechanical and electrical instruments. It should be eloquent in
respect of quantum of specific construction material needed for emergency repair
along with delineation of the suitable locations for its stocking and also identify the
much-needed machinery and equipment for executing emergency repair work and
for accomplishing the evacuation plan.
10.7.3. Emergency Action Plan (EAP)
Dam safety programme as indicated above includes the formation of an Emergency
Action Plan for the dam. An emergency is defined as a condition of serious nature
which develops unexpectedly and endangers downstream property and human life
and required immediate attention. Emergency Action Plan should include all potential
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 154
indicators of likely failure of the dam, since the primary concern is for timely and
reliable identification and evaluation of existing of potential emergency.
This EAP presents warning and notification procedures to follow during the monsoon
season in case of failure or potential failure of the dam. The objective is to provide
timely warning to nearby residents and alert key personnel responsible for taking
action in case of emergency.
10.7.4. Administration and Procedural Aspects
The administrative and procedural aspects of the Emergency Action Plan consist of
flow chart depicting the names and addresses of the responsible officials. In order of
hierarchy, the following system will usually be appropriate. In the event that the
failure is imminent or the failure has occurred or a potential emergency conditions is
developing, the observer at the site is required to report it to the Junior Engineer /
Assistant Engineer who will report to the Executive Engineer / Superintending
Engineer for their reporting to the Chief Engineer through a wireless system or by
any available fastest communication system. The Engineer-in-Charge is usually
responsible for making cognizant with the developing situation to the Civil
Administration viz. District Magistrate. Each personnel is to acknowledge his/her
responsibilities under the EAP in an appropriate format at a priority.
The technical aspects of the EAP consist of preventive action to be taken with
regards to the structural safety of the dam. The EAP is drawn at a priority for the
regular inspection of the dam. For this purpose, providing an adequate and easy
access to the dam site is a necessity. The dam, its sluices, overflows and non-
overflow sections should be properly illuminated for effective operations during night
time. Whenever sinkholes, boils, increased leakages, movement of masonry rock,
gate failure, rapid rise or fall of the level in the reservoir, rise in the level of reservoir
beyond the maximum working level, or wave overrun of the dam crest are observed,
the personnel on patrol is required to inform immediately to the Junior Engineer
(JE)/Assistant Engineer (AE) for initiation of the execution of EAP. They are required
to inform the Engineer-in-Charge and the local administrative authorities. It is
desirable if the downstream inhabitants are warned using siren, if available, so as to
make them aware the likely imminent danger.
The other preventive measures may include availability of sufficient number of
sandbags at several selected downstream locations and logs (for holding and
sandbags) and at the dam site, one tractor, two motor boats, gas lanterns, Manila
ropes and life jackets. Areas from where the labour can be mobilized should be
chalked out at a priority. In addition to these, public participation in the process of
execution of the EAP may further help in amelioration of the adverse impacts of the
likely disaster. For this, it is necessary that the public should be made aware of its
responsibilities.
10.7.5. Preventive Action
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 155
Once the likelihood of an emergency situation is suspected, action has to be initiated
to prevent a failure. The point at which each situation reaches an emergency status
shall be specified and at that stage the vigilance and surveillance shall be upgraded
both in respect of time and level. At this stage a thorough inspection of the dam
should be carried out to locate any visible sign(s) of distress.
Engineers responsible for preventive action should identify sources of equipment
needed for repair, materials, labour and expertise for use during an emergency. The
amount and type of material required for emergency repairs should be determined
for dam, depending upon its characteristics, design, construction history and past
behavior. It is desirable to stockpile suitable construction materials at appropriate
sites. The anticipated need of equipment should be evaluated and if these are not
available at the dam site, the exact location and availability of these equipments
should be determined and specified. The sources/agencies must have necessary
instructions for assistance during emergency. Due to the inherent uncertainties about
their effectiveness, preventive actions should usually be carried out simultaneously
with the appropriate notification on alert situation or a warning situation. The flow
chart of the responsibilities of Project Proponent and Civil Administration, District
Kishtwar is shown in Figure 10.3.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 156
Figure 10.3 : Flow Chart of Responsibilities
Project
Proponent
DIST.
ADMINISTRATION
Preparing of Dam Safety
and
Maintenance Manual
Watch on Status of
Emergency
Setting-up of Control
Room, Communication &
Alert Systems
Running of
disaster/district
flood control room
Preparation of
evacuation
plan and team
Public awareness
and mock drills
Formation of Emergency
Action Plan in conjunction
with Dist. Authority
Preparing of Dam Safety
and
Maintenance Manual
To pass information
about emergency
situation to higher officers
SE/Head of emergency
core group to take
stock of disaster
situation and pass
message to DM
D. M., To relocate people to place at
higher altitude and to provide
temporary shelters and deployment
of transport vehicle
S. P.
To maintain
Law & order
C.M.O. To provide
medical relief &
tackle morbidity
of affected
persons
To arrange relief material and
distribution to the affected
persons and animals
Assessment of loss to human
life and animals and the assets /
property
Arrangement of
construction
material and machinery for
emergency repair
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 157
10.7.6. Communication System
An effective communication system and a downstream warning system are
absolutely essential for the success of an emergency preparedness plan. The
difference between a high flood and dam-break situation must be made lucidly clear
to the downstream population.
10.7.7. Evacuations Plans
Emergency Action Plan includes evacuation plans and procedures for
implementation based on local needs. These could be:
- Demarcation / prioritization of areas to be evacuated. - Notification procedures and evacuation instructions. - Safe routes, transport and traffic control. - Safe areas/shelters. - Functions and responsibilities of members of evacuation team.
Any precarious situation during floods will be communicated either by an alert
situation or by an alert situation followed by a warning situation. An alert situation
would indicate that although failure of flooding is not imminent, a more serious
situation could occur unless conditions improve. A warning situation would indicate
that flooding is imminent as a result of an impending failure of the dam. It would
normally include an order for evacuation of delineated inundation areas.
10.7.8. Evacuation Team
It will comprise of following official / Representative:
- District Magistrate (D. M.)/his Nominated officer (To peacefully relocate the people to places at higher elevation with state administration).
- Engineer in charge of the project (Team Leader)
- Superintendent of Police (S. P.)/Nominated Police Officer (To maintain law and order)
- Chief Medical Officer (C. M. O.) of the area (To tackle morbidity of affected people)
- Sarpanch/Affected village Representative to execute the resettlement operation with the aid of state machinery and project proponents.
- Sub committees at village level
The Engineer-in-Charge will be responsible for the entire operation including prompt
determination of the flood situation time to time. Once the red alert is declared the
whole state machinery will come into swing and will start evacuating people in the
inundation areas delineated in the inundation maps. For successful execution,
annually demo exercise will be done. D. M. is to monitor the entire operation.
10.7.9. Public Awareness for Disaster Mitigation
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 158
In addition, guidelines that have to be followed by the inhabitants of flood prone
areas, in the event of flood resulting from dam failure, which form part of public
awareness for disaster mitigation may also include following:
1. Listen to the radio for advance information and advice.
2. Disconnect all electrical appliances and move all valuable personal and household goods beyond the reach of floodwater, if one is warned or if one suspects that flood waters may enter the house.
3. Move vehicles, farm animals and movables goods to the higher place nearby.
4. Keep sources of water pollution i.e. insecticides out of the reach of water.
5. Turn off electricity and LPG gas before one has to leave the house.
6. Lock all outside doors and windows if one has to leave the house.
7. Do not enter floodwaters.
8. Never wander around a flood area.
10.7.10. Notifications
Notification procedures are an integral part of any emergency action plan. Separate
procedures should be established for slowly and rapidly developing situations and
failure. Notifications would include communication of either an alert situation or an
alert situation followed by a warning situation. An alert situation would indicate that
although failure or flooding is not imminent, a more serious situation could occur
unless conditions improve. A warning situation would indicate that flooding is
imminent as a result of an impending failure of the dam. It would normally include an
order for evacuation of delineated inundation areas.
10.7.11. Notification Procedures
Copies of the EAP that also include the above described inundation map are
displayed at prominent locations, in the rooms and locations of the personnel named
in the notification chart. For a regular watch on the flood level situation, it is
necessary that the flood cells be manned by two or more people so that an
alternative person is always available for notification round the clock. For speedy and
unhindered communication, a wireless system is a preferable mode of
communication. Telephones may be kept for back up, wherever available. It is also
preferred that the entire flood cells, if more that one, are tuned in the same wireless
channel. It will ensure communication from the dam site to the control rooms. The
communication can be established by messenger service in the absence of such
modes of communication.
10.7.12. Management after receding of Flood Water
It is to be accepted that in the event of dam break, even with maximum efforts, the
loss of human lives, livestock and property would be inevitable. Under such a
scenario, a massive effort would be used by various government agencies to provide
various relief measures to the evacuees. Formulation of a plan delineating such
measures is beyond the scope of work of this document. However, some of the
measures which need to be implemented are listed as below: -
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 159
Provision of various food items and shelter to the evacuees.
Provision of fuel for various evacuees.
Provision of adequate fodder supply.
Arrangements for potable water supply.
Commissioning of low cost sewage treatment and sanitation facilities, and disposal of treatment sewage.
Expeditious disposal of dead bodies human and livestock.
Immunization programmes for prevention of outbreak of epidemics of various water related diseases.
Adequate stocks of medicines of various diseases, especially water-related diseases.
10.7.13. Communication between Different Projects
Two other HEP, viz. Kirthai Stage-I HEP and Kiru HEP have been proposed on u/s
and d/s of the proposed Kirthai HEP, Stage-II. These projects shall run in tandem.
Therefore, a comprehensive monitoring network system has to be established to
combat jointly the threat due to failure of any of these schemes. For accomplishing
these, a full poof “no communication failure” system has to be evolved.
10.8. Flood Forecasting
The importance of flood forecasting is paramount in a dam break scenario, by
overtopping, when little or no reaction time is left for the people to evacuate to safe
places. Effective and accurate flood warning can facilitate the evacuation of people
living in flood zone, their property and livestock, opportune maintenance and early
alerting of emergency services besides exercising legitimate control by adjusting
downstream releases from reservoir / ponds or achieving the balance pond. An
advance warning of approaching flood allows suitable reservoir operation for
moderating its intensity / peak and also helps in ensuring full storage and for flood
relief purposes.
The catchment of the Chenab, upto the proposed dam site, extends approximately
9987 Sq Km in area. River flows are constituted of two main natural components viz.,
run-off resulting from precipitation and base flow derived from spring flows. Due to
mountains topography, the excessive bed slope causes rapid run-off from the
contributing hill torrents to the main river. There is no extensive network of
meteorological station, rain gauge; snow-gauge; gauge and discharge sites in the
catchment area. Many of the sub-watersheds within the catchment are un-gauged.
Currently flood warning relies on issuing of alerts when the river level at a few
location reaches are within a few meter below the high flood levels observed in the
past. Sometime these warnings may be accurate but due to very little lead time
between the HFL being very fast approached and the commencement of flooding.
Due to the existence of fertile agricultural land and its expansion along the river
banks and concentration of population in the region of submergence area, there is a
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 160
need for developing an operational flood forecasting system as a part of
preparedness strategies for disastrous flood events by providing advance warning
several days ahead such that the public and the district authorities have adequate
time at their disposal without being panicky.
Due to morphological characteristics, the flood plains and the area near to the river /
stream banks, classified under land use class agriculture and settlement, are more
prone to the flood hazards. In such areas delineation of flood zone and its height
besides detecting the characteristics of floods in different return periods is most
significant. Thus flood zonation is not only essential in respect of various
development activities in the likely inundation area, but also for study of ecological
and environment impacts. For the study of flood zonation, within the likely inundation
area, for different time periods of 2, 5, 10, 25, 50 and 100 years, topography maps at
1:1000 scale shall have to be developed.
All forms of flood forecasting use some type of trigger mechanism to anticipate when
the water level of the river at the flood risk area shall exceed the threshold. When the
trigger reaches a predetermined level that is less than the threshold, a warning is
triggered. In case of a small river, a rainfall-runoff based model may be adequate
within reasonable limits of accuracy. In case of large rivers, like Chenab, forecasting
of discharge by upstream stages, with a high degree of sophistication is involved.
The main aim is to assess the future output at different time as accurately as
possible, i.e. within narrow error bonds, starting with measurements of present and
past input quantities. Interaction between a comprehensive hydrological model and
geographical information system (GIS) technique provides a better forecasting tool.
The main requirement of a hydrological model is description of flow channel
characteristics and land surface as input data to the watershed model. The flood
zonation is actualize, development and perfection of the applied engineering
hydrology and its aim is to acquire a real time rainfall data and river flow by short
wave, radio and satellite network, and using them tin rainfall runoff models to
forecast.
For enabling GIS based flood forecasting using hydrological model, a network of
meteorological station, rainfall and snowfall gauges, gauge and discharge sites
equipped with latest state-of-the-art gadgets, meteorological radar shall have to be
established. Survey of inundation area at 1:1000 scales with 1.0 meter shall have to
be conducted. On these counts, a sum of Rs. 15 Lac is being earmarked.
10.9. Cost Estimate
The budget for different activities required to be carried out for mitigation and prevention of dam break hazard exclusively from the dam is given in Table 10.2.
Table 10.2 : Cost Estimate for Implementing DMP
S. No Particular Cost (Rs. Lac)
1. Installation of alert system in control room and at
Dam Site
3.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 161
S. No Particular Cost (Rs. Lac)
2. Setting up of communication system between u/s
and d/s of project
5.00
3. Setting up of communication system between dam
and d/s settlements
10.00
4. Public information system 2.00
5. Setting up of a seismic observatory at dam site 15.00
6. Flood forecasting 15.00
6. Training and miscellaneous 5.00
Total 55.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 162
11. WATER, AIR AND NOISE MANAGEMENT PLAN
11.1. Control of Air Pollution
11.1.1. Impacts on Air Quality
In a water resources project, air pollution occurs mainly during project construction
phase. The major sources of air pollution during construction phase are:
Fuel combustion in various construction equipments, e.g. heavy earth movers,
loaders, drillers, rock bolters, diesel generating sets, compressors etc.
Fugitive emissions from stone aggregate crushers.
Impacts due to vehicular movement
a. Pollution due to fuel combustion in various equipments
The running operation of various construction equipments involves combustion of
fossil fuel for running the engine. Normally, diesel is used in such equipment. The
major pollutant, which gets emitted because of diesel combustion, is SO2. The PM10
emissions are minimal due to low ash content. Based on experience in similar
projects, PM10 and SO2 are not expected to increase significantly. Thus, in the
proposed project, no significant impact on ambient air quality is expected because of
operation of various construction equipments.
b. Emissions from various crushers
The operation of crushers (500 and 200 tph) during the construction phase is likely to
generate fugitive emissions, which can move even up to 1 km in predominant wind
direction. During crushing operations, fugitive emissions comprising of the
suspended particulate matter will be generated. There could be marginal impacts to
settlements close to the site at which crushers are commissioned. However, based
on experience, adverse impacts on this account are not anticipated. The labour
camps, colonies, etc. shall be located outside the impact zone (about 1.5 to 2 km) of
the crusher plant.
c. Impacts due to vehicular movement
During construction phase, there will be increased vehicular movement for
transportation of various construction materials to the project site. Large quantity of
dust is likely to be entrained due to the movement of trucks and other heavy
vehicles. However, such ground level emissions do not travel for long distances.
Thus, no major adverse impacts are anticipated on this account.
11.1.2. Mitigation Measures
a) Control of Emissions
Minor air quality impacts will be caused by emissions from construction vehicles,
equipment and DG sets, and emissions from transportation traffic. Frequent truck
trips will be required during the construction period for removal of excavated material
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 163
and delivery of concrete mix and other equipment and materials. The following
measures are recommended to control air pollution:
The contractor will be responsible for maintaining properly functioning
construction equipment to minimize exhaust.
Construction equipment and vehicles will be switched off when not used for
extended periods of time.
Unnecessary idle running of construction vehicles to be prohibited.
Effective traffic management to be undertaken to avoid significant delays in and
around the project area.
Road damage caused by sub-project activities will be promptly attended to with
proper road repair and maintenance work.
b) Air Pollution control due to DG sets
The Central Pollution Control Board (CPCB) has issued emission limits for
generators up to 800 KW. The same are outlined in Table 11.1, and are
recommended to be followed.
Table 11.1 : Emission limits for DG sets prescribed by CPCB
Parameter Emission limits (gm/kwh)
NOx 9.2
HC 1.3
CO 2.5
PM 0.3
Smoke limit* 0.7
Note: * Light absorption coefficient at full load (m-1)
The above standards need to be followed by the contractor operating the DG sets.
c) Dust Control
The project authorities will work in close association with representatives from the
community living near project area to identify areas of concern and to mitigate dust-
related impacts effectively (e.g., through direct meetings, utilization of construction
management and inspection program, and/or through the complaint response
program). To minimize issues related to the generation of dust during the
construction phase of the project, the following measures have been identified:
Identification of construction limits (minimal area required for construction
activities).
When practical, excavated spoils will be removed as the contractor proceeds
along the length of the activity.
When necessary, stockpiling of excavated material will be covered or staged
offsite location with muck being delivered as needed during the course of
construction.
Excessive soil on paved areas will be sprayed (wet) and/or swept and unpaved
areas will be sprayed and/or mulched. The use of petroleum products or similar
products for such activities will be strictly prohibited.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 164
Contractors will be required to cover stockpiled soils and trucks hauling soil,
sand, and other loose materials (or require trucks to maintain at least two feet of
freeboard).
Contractor shall ensure that there is effective traffic management at site. The
number of trucks/vehicles to move at various construction sites to be fixed.
Dust sweeping - The construction area and vicinity (access roads, and working
areas) shall be swept daily or as necessary to ensure there is no visible dust.
Kutcha surface / earthen roads shall be sprinkled with water twice a day.
Dust mufflers shall be provided at batching plants and stone aggregate crushers.
11.1.3. Implementing Agency
Various management measures required for control of air pollution need to be
included in the Tender Document for the Contractor involved in construction
activities. The same shall be monitored on a regular basis by the project proponents.
Considering an expenditure of Rs. 2000/day for 240 working days annually
(excluding rainy season of 4 months), a sum of Rs. 26.40 lac has to be earmarked
under air pollution control measures for copious sprinkling on roads for dust
suppression.
11.2. Impacts on Noise Levels
In a water resource project, the impacts on ambient air noise levels are expected
only during the project construction phase, due to operation of heavy earth moving
machinery, etc. Likewise, noise due to quarrying, blasting, vehicular movement will
have some adverse impact on the ambient noise levels in the area.
11.2.1. Mitigation Measures
The contractors will be required to maintain proper functioning of equipment and
comply with occupational safety and health standards. The construction equipment
will be equipped with noise suppression devices and properly maintained mufflers.
Vehicles to be equipped with mufflers recommended by the vehicle
manufacturer.
Staging of construction equipment and unnecessary idling of equipment within
noise sensitive areas to be strictly avoided.
Use of temporary sound fences or barriers with acoustic material at sensitive
locations
Notification shall be provided at a conspicuous place close to residential areas
within 100 meter of major noise generating activities. The notification will
describe the noise abatement measures that will be implemented.
Monitoring of noise levels will be conducted during the construction phase of the
project. In case of exceeding of pre-determined acceptable noise levels by the
machinery will require the contractor(s) to halt work and remedy the situation
prior to continuing construction.
The following Noise Standards for DG sets are recommended for the running of DG
sets during the construction:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 165
The maximum permissible sound pressure level for new diesel generator sets
with rated capacity upto 1000 KVA shall be 75 dB(A) at 1 m from the enclosure
surface.
Noise from the DG set should be controlled by providing an acoustic enclosure or
by treating the enclosure acoustically
The Acoustic Enclosure should be made of CRCA sheets of appropriate
thickness and structural/ sheet metal base. The walls of the enclosure should be
insulated with fire retardant foam to comply with the 75 dB(A) at 1m sound levels
specified by CPCB, Ministry of Environment & Forests.
The acoustic enclosure/acoustic treatment of the room should be designed for
minimum 25 dB(A) insertion loss or for meeting the ambient noise standards,
whichever is on the higher side.
The DG set should also be provided with proper exhaust muffler with insertion
loss of minimum 25 dB(A).
Proper efforts to be made to bring down the noise levels due to the DG set,
outside its premises, within the ambient air noise requirements by proper placing
and control measures.
A proper routine and preventive maintenance procedure for the DG set should be
set and followed in consultation with the DG set manufacturer which would help
prevent noise levels of the DG set from deteriorating with use.
Based on literature review, noise generated by crushers is in the range of 79-80
dB(A) at 80 m from the crusher. Thus, noise level at 160 m from the crusher shall
be of the order of 74 dB(A). The exposure to labour operating in such high noise
areas shall be restricted up to 30 minutes daily. Alternatively, the workers need to
be provided with ear muffs or plugs, to attenuate the noise level near the crusher
by at least 15 dB(A). The exposure to noise level in such a scenario is limited up
to 4 hours per day.
It is known that continuous exposure to noise levels above 90 dB(A) affects the
hearing of the workers/operators and hence has to be avoided. Other
physiological and psychological effects have also been reported in literature, but
the effect on hearing has been specially stressed. To prevent these effects, it
has been recommended by international specialist organizations that the
exposure period of affected persons be limited as specified in Table 11.2.
Table 11.2 : Maximum Exposure Periods specified by OSHA
-----------------------------------------------------------------------------------------------------------------
------
Maximum equivalent continuous Unprotected exposure
noise level dB(A) period per day for 8
hrs/day and 5 days/week
-----------------------------------------------------------------------------------------------------------------
------
90 8
95 4
100 2
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 166
105 1
110 1/2
115 1/4
120 No exposure permitted at or
above this level
-----------------------------------------------------------------------------------------------------------------
The workers deployed at such locations where the noise levels are high shall be
provided with earplugs. The cost of earplugs including its replacement during 5 years
shall be Rs. 3.6 lakh.
11.3. Control of Water Pollution During Construction Phase
During project construction phase, sufficient measures need to be implemented to
control the problem of water pollution from various sources. The sewage generated
from various labour camps is proposed to be treated in an oxidation ditch, prior to its
disposal. However, efforts shall be made to discharge the treated effluent only in
these water bodies, which are not used for meeting domestic water requirements. It
is proposed to provide adequate capacity STP for project colony and labour colony
for which an amount of Rs 60 lac has been earmarked.
The construction activities would require a crusher to crush large lumps of rocks to
the requisite size for coarse as well as fine aggregates. The effluent generated from
these crushers will have high-suspended solids. The effluent needs to be treated
before disposal. Settling tanks of appropriate size for treatment of effluent from
various crushers should be provided.
During tunneling work the ground water flows into the tunnel along with construction
water, which is used for various works like drilling, shortcreting, etc. The effluent thus
generated in the tunnel contains high suspended solids. Normally, water is collected
in the side drains and drained off into the nearest water body without treatment. It is
recommended to construct a settling tank of adequate size to settle the suspended
impurities. Effluents are expected to be generated from adit locations. The sludge
from the various settling tanks can be collected once in 15 days and disposed at the
site designed for disposal of municipal solid wastes from the labour camps. The
sludge after drying could also be used as cover material for landfill disposal site. An
amount of Rs. 5.00 lac has been earmarked for construction of various settling
tanks.
11.4. Cost Involved Towards Control of Water, Air & Noise Pollution
The cost of mitigative measures suggested for control of water, air and noise is given
in Table 11.3.
Table 11.3 : Cost of Mitigative Measures
S. No. Particulars Amount (Rs. Lac)
1. Control of air pollution 26.40
2. Control of noise pollution 3.60
3. Control of water pollution 65.00
Total 95.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 167
12. 12. 12. 12. PUBLIC HEALTH DELIVERY PLAN
12.1. Introduction
The project area lies in Paddar Block of district Kishtwar and the project affected
villages are situated on both banks of the Chenab. These villages are located
between elevation 1780 masl to 1900 masl. The data on the health status, prevailing
diseases and other information on health and hygiene were collected from the
existing PHC at Atholi and from the health workers of the area.
From the information collected, it has been revealed that no ethnic disease is
associated with people of the region but acute dysentery, gastrointestinal problems,
acute respiratory infection are common endemic diseases prevalent in the area. The
incidence of hypothyroidism has reduced with the mandatory sale of iodized salt in
the area. The incidence of Malaria is not there. The status of existing health facilities
available in the affected area and its near vicinity are given in Table 12.1.
Table 12.1 : Existing Health Facilities in the Project Affected Area
S. No. Name of
Village /
Town
Available
Medical
Facilities
Types of Diseases prevailing in the
area
Distance
from project
(km)
1 Atholi PHC Respiratory Diseases, Dysentery,
Diarrhoea
12
2 Massu PHC Tuberculosis, Heart Problems &
Respiratory disease
20
3 Keeru PHC Tuberculosis, dysentery, diarrhea &
Respiratory disease
42
4 Sohal Ayurvedic
Dispensary
Dysentery, Diarrhoea, Tuberculosis,
Respiratory disease
24
The annual statement for year 2009 showing institutional cases due to
communicable and non-communicable diseases obtained from SMO, PHC Atholi is
summarized in Table 12.2.
It is inferred from the table that lung diseases, diarrhea, bacillary dysentery, and
respiratory diseases are common diseases prevalent in the area. Acute bacterial and
viral respiratory infections are affecting large number of the people in this zone,
which requires advanced medical treatments to reduce the number of incidences.
The prevalent diseases observed by the health centers among the local inhabitants
of the area are acute respiratory infection, fever, Reproductory tract infection (RTI),
scabies, worm disease, ENT, skin diseases, common cold, diarrhea, leuchoria, back
pain, accidental cases and eye infection etc. Initial health assessment reveals that
there is no specific health hazard in study area.
Table 12.2 : Summary of Diseases Prevalent in the Study Area
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 168
Sl. No. Name of diseases Total
1. Acute diarrhea diseases including gastrointestinal etc. 2305
2. Ascarises 426
3. Viral fever 1250
4. Conjunctivitis 293
5. Acute respiratory infection including influenza but excluding
pneumonia
1440
6. Pneumonia 380
7. Hypertension 390
8. All other diseases 9675
Total 16159
12.2. Likely Impacts on Human Health Due to The Project
Construction of the proposed project may cause the following impacts on health of
local residents and the work force:-
Fuel and dust emission may cause respiratory problems like asthma for which
mitigating measures like wet excavation of exposed surfaces, battery operated muck
cars in underground excavation shall be deployed. Frequent water sprinkling at least
thrice a day shall be carried out on haul roads in the project activity area. All
approach roads to site shall be metaled.
The scheme involves a diversion dam, where the flowing discharge, is made to
impound upstream of the dam to be diverted through underground conveyance
system for continuous generation of power including peaking demand. Thus the
pond level shall be subjected to fluctuation and the chances of water surface being
still are not there. However, localized stagnation in borrow pit areas is expected
during construction in some of the areas, which may require sprinkling of anti-
bacterial/insecticides to control propagation of bacteria related disease.
The influx of labour-force during construction warrants proper sanitation and hygiene
facilities to avoid diseases related to sewage pollutants such as Typhoid, Cholera &
Gastroenteritis.
12.3. Proposed Health Management Plan
Based on the impact evaluation following mitigation measures are proposed to be
adopted for management of health environment: -
12.3.1. Awareness Programme
The project authorities should undertake through “Hospital Kalyan Samiti“, Atholi,
various awareness programmes by organizing camps and poster presentation etc. in
the directly affected areas to bring about awareness on prevention and control of
various diseases such as Malaria, Dengue, Cholera, Gastroenteritis, STD, AIDS,
Cancer etc. Special emphasis should also be given to provide awareness on Family
Planning to the local people. Special awareness programmes should be undertaken
to explain to people about diseases like Tuberculosis (TB) and Asthma.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 169
12.3.1.1 Asthma
Asthma is a long-term (chronic) disease of the airways which are involved in carrying
air in and out of the lungs. Its symptoms are caused by inflammation, which makes
the airways red, swollen, narrower and extra sensitive to irritants. This leads to
recurrent attacks of wheezing, breathlessness, chest tightness and coughing.
Asthma does not stay the same, but changes over time and every person with
asthma has a good and bad days. However, if asthma is properly treated, one can
enjoy long periods without symptoms or attacks. The causes of asthma are not fully
understood. Asthma is usually caused by a mixture of hereditary (which a person is
born with) and environmental factors.
Allergens from house dust mites and pets are the most common causes, but many
other allergens, such as pollen and moulds, can cause asthma. Some patients with
asthma have no obvious allergies.
Treatment of asthma requires two types of medicines, preventers and relievers.
Preventers are medicines that prevent asthma attacks from starting. The most
effective and most commonly used preventer medicines are inhaled
glucocorticosteroids. Reliever medicines, like inhaled salbuamol, salmeterol etc,
provide rapid relief from an asthma attack by quickly opening the narrowed airways
(dilating the bronchi).
12.3.1.2 Tuberculosis (TB)
It is a communicable, but curable bacterial infection caused by Mycobacterium
tuberculosis. The lungs are primarily involved, but the infection can spread to other
organs.
TB is spread through the air when a person with TB in the lungs or throat coughs or
sneezes, sending TB germs in the air. When other people breathe in these germs
they may become infected. The primary stage of the infection is usually
asymptomatic (without symptoms). Pulmonary TB develops in the minority of people
whose immune systems do not successfully contain the primary infection. In this
case, the disease may occur within weeks after the primary infection. TB may also lie
dormant for years and reappear after the initial infection is contained.
This TB infection becomes ‘disease’ when the body’s defenses are weakened, due
to aging, a serious illness, stressful event, drug or alcohol abuse, HIV infection (the
virus that causes AIDS) or other conditions. When inactive TB germs become active,
they multiply and damage the lungs or other parts of the body and the disease
develops. Only about 10% of people infected with TB germs develop TB disease.
12.3.1.3 Malaria
Once adult mosquitoes have emerged, the ambient temperature, humidity and rains
will determine their chances of survival. To transmit malaria successfully female
anopheles must survive long enough after they have become infected (through a
blood meal on an infected human) to allow the parasite they now harbour to
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 170
complete their growth cycle. That cycle takes 9-21 days @ 250 C. Below a minimum
ambient temperature (150 C for plasmodium vivax, 200 C for P falciparium) the cycle
cannot be completed and malaria cannot be transmitted. In the study area, the
average maximum temperature during month of May to September is near 270C,
thus chances for transmission of malaria from an infected person cannot be ruled
out.
12.3.2. Establishment of Project Hospital
In the wake of the fact that the proposed site of Kirthai, Stage-I & II is very near being
16 km from each, the project proponent shall develop and maintain a common and
full-fledged hospital within the project area, which shall have trained staff,
equipments and medicines besides manning a mobile health van which will render
on-site medical assistance to the local folk of the project affected villages with a
frequency of twice a month for 5 years. However, onsite medical facility should also
be provided in the labour colonies/camps along with first aid facilities at all the
working sites. The capital cost of establishing and development hospital at the
project site shall be covered under sub head “K-building” in the DPR. The hospital
facilities would be available to the staff, workers and local people. Free medicines
should be distributed to the identified project affected families who shall be provided
with identity cards and to the locals. Provision for ambulances, which will function
around the clock, should be made in the DPR, under sub head “Q-spl T & P”. Free
facilities of ambulance shall be made available to the project affected families (PAFs)
and project labourers and for the people meeting accident on the state highway
/district roads. Under subhead “O-Miscellaneous” provision shall be earmarked for O
& M charges for ambulances and therefore, additional O & M charges for mobile
health van have been included in the plan. The cost of providing free veterinary
health services in the project affected villages shall also be provided in the plan.
Provision should be provided in DPR for arranging medical equipment for hospital.
The project authorities should undertake various health care programmes in
consultation with State Health Department such as providing vaccination and other
primary health care facilities. Provision of Rs 10.0 lac shall have to be made for
providing medical assistance like free medicines for labourers, PAF and local people.
It is also proposed to provide aid for purchase of medical equipment for PHC at
Atholi which is the nearest PHC under the project area but inadequately provided
and thus need to be strengthened. One time financial aid for strengthening PHC for
Massu is also envisaged under the plan.
12.3.3. Malaria Control and Vaccination Programme
The borrow pits caused during construction activities provide habitat ground for
mosquito population increase and develop the risk of malaria & elephantiasis during
rains. However, proper arrangements should be made and implemented for
maintaining hygienic conditions in the area. Besides these, arrangements are
proposed to distribute medicines and anti-malarial drugs as and when required.
Various vaccination programmes shall be arranged periodically as and when
required for the locals of the project area.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 171
12.4. Cost Estimate for Health Management Plan
The details of the expenditure likely to be incurred on the implementation of the Health Management Plan other than the project hospital are given in Table 12.3.
Table 12.3 : Budget Estimate of Health Management Plan
S.
No.
Particulars Amount
(Rs. in lac)
1. Free medicines for labourers, PAF, local people @ Rs. 5.0 lac each
dispensary per year for 5 years
25.0
2. Provision mobile health service for 5 years @ Rs. 2.00 lac/ year 10.00
3. Capital cost of mobile heath van with accessories 9.00
4. O & M charges of mobile heath van @ Rs 1.6 lac/year for 5 years 8.00
5. Spraying of insecticide @ Rs. 2 lac/year for 5 years 10.00
6. Health awareness / vaccination camps @ Rs. 1.4 lac/year for 5
years through District Hospital, Kishtwar
7.00
7. Financial aid for purchasing medical equipment/ instruments etc. for
PHC Atholi and Massu @ Rs. 15.0 lac each
30.00
8. Cost of one incinerator to be provided at project hospital 20.00
9. O & M charges for incinerator @ Rs. 1.20 lac/ year for 5 years 6.00
10. Providing Veterinary health service for 5 years @ Rs 1.0 lac/year. 5.00
11. Provision for chlorination of drinking water in project affected
villages
30.00
Total 160.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 172
13. LABOUR MANAGEMENT PLAN FOR HEALTH AND SAFETY
13.1. Introduction
Construction projects, which invariably engaged large number of contract workers,
are highly prone to hazards pertaining to site activities. Generally, the workers come
from the rural areas and agricultural background and do not have adequate training
in construction safety and some time workers from varied trades are also drawn into
construction activities. Thus, workers are exposed to various risks and occupational
diseases and health hazards which sometimes cause grave injuries and prolong
illness. Therefore, it is incumbent upon the project proponent to have certain safety
guidelines for site activities and create awareness among the workers, supervisors
and engineers.
A hydroelectric construction project like any other construction project has significant
impact on health and safety during project execution and its operational stage which
need to be managed systematically since the project inception. In hydroelectric
project the risk is involved to the labour in various activities like excavation on hill
slope, underground excavation, quarrying operation, works related to Electrical and
Mechanical components, various activities in workshop and machine halls. The
project envisages deployment of workforce to the tune of 1800 mainly comprising of
skilled/semi-skilled/unskilled workers at the peak construction stage.
13.2. Legal Framework for Health and Safety Management
The following Indian standard listed below contain provision for managing
Occupational health and Safety Management.
S. No IS No Title
1 15793:2007 Managing Environment, Occupation Health and Safety Legal Compliance – Requirement of good practices.
2 15883 (part-I) :2009 Guidelines for construction project management.
3 18001:2007 Occupational Health and Safety Management System
4 IS 15883 (Part 5) Guidelines for construction project Management-Health and Safety Management
As per general requirement under OH&S management system the organization
(project proponent) shall establish, document, implement, maintain and continually
improve an OH&S management system, in accordance with the requirement of this
standard. The organization shall define and document the scope of its OH&S
management system.
13.3. Health and management safety requirement
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 173
The project proponent shall have a written statement prescribing the health and
safety policy of the organization. The policy shall convey the management
commitment and its intent towards health and safety, its implementing organization
and arrangement to ensure that the set objectives are met. It shall also provide a
framework for establishing, maintaining and periodically reviewing health and safety
objectives and targets. The salient aspects which will be covered in the project health
and safety plan are:
Project specific health and safety objectives, targets and programmes in line with health and safety policy;
Hazard identification and risk assessment;
Health and safety organization;
Resources, roles, responsibility and authority;
General health and safety rules;
Health and safety requirements to be followed by sub-contractors;
Operation control procedure;
Activities requiring work permit system and its procedure;
Management of traffic safety inside the project;
Access control of employees;
Safety of visitors;
Management of critical activities such as work a height, material handling and working with plant and machinery;
Ensuring the competency and awareness of the workmen;
Fire prevention and firefighting plan;
Emergency preparedness and response plan;
Traffic management plan;
Training matrix; and
Personal Protective Equipment Matrix.
Health and safety performance monitoring measures such as Inspection, Audit Incident reporting and investigation procedure
13.3.1. Resource, Roles, Responsibility and Authority
Project manager shall define, document and communicate the roles, responsibilities
and authorities of all personnel like health and safety officer and supervisor who
manage, perform and verify activities having an effect on health and safety risks.
The line management personnel who are responsible for execution of activities are
directly responsible for health and safety in the work under their control.
Health and safety officers shall administratively report to the project manager and
functionally report to the senior health and safety representative of the organization.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 174
Health and safety supervisors shall be engaged to assist the health and safety
officers in performing their duties.
Management shall provide adequate resources essential to effectively manage the
health and safety management system requirements of the project. The resources
shall include human resources, organizational infrastructure, technology and
financial resources.
13.3.2. Competence, Training and Awareness
It shall be ensured that all employees are competent to perform the assigned work
safely on the basis of appropriate education, training or experience. Training needs
of the different category of employees shall be identified at the beginning of the
project and a training matrix and training plan shall be prepared for implementation.
The objective of health and safety Training shall be
to equip the employee with necessary knowledge and skill to perform the work assigned to him in a safe manner;
to foster continual improvement; and
to imbibe safety culture.
After completion of training due procedure shall be followed for obtaining the
feedback from the participants on the effectiveness of the training.
13.3.3. Health and Safety Reporting
Procedures shall be established for timely recording and reporting of information
required for continual improvement of health and safety performance. Reporting
procedures shall cover:
Incident reporting
Non-conformance reporting
Health and safety performance reporting
Hazard Identification reporting
Statutory reporting requirements
Stakeholder reporting
The recording of reporting of health and safety performance shall be
clearly documented in the project health and safety plan
13.3.4. Permit to Work Systems
Activities requiring permit to work shall be decided before starting the construction
and shall be suitably documented in the project health and safety plan. Some of the
activities which may require permit to work are:
Excavation
Entry into confined spaces
Electrical work (HV/LV)
Opening manholes, covers and grills
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 175
Blasting operation
Hot work
Work on plant, machinery and other power driven equipment.
Working at height
Working at night
The project team may establish a permit to work system for any other hazardous
activity which they feel need to be controlled administratively for safe execution
13.3.5. Certification of Plant and Machinery, Lifting
Tools and Tackles Lifting appliance such as crane, hoist, derrick, winch, gin pole,
sheer legs, jack, pulley block and other equipment used for lifting materials, objects
or building worker; lifting gear such as ropes, chains, hooks and slings; and other
accessories of a lifting appliance shall be tested and examined by a competent
person for the first time. These shall thereafter be tested and examined by a
competent person once every year as per the provision of Building and other
Construction Workers (Regulation of Employment and Conditions of Service) Act,
1996 and other relevant central and state rules and regulations. Apart from the
above statutory testing and examination, project specific procedures shall be
established to ensure the fitness of machinery and equipments being deployed at the
project for the first time. Regular Inspections shall be carried out to ensure that
machinery and equipments continue to be in safe condition.
13.3.6. Fire Prevention and Control
Fire prevention measures such as controlling the ignition source and segregation of
flammable materials shall be implemented to prevent fire.
Adequate firefighting facilities such as portable first aid fire extinguishers, fire buckets
filled with water and sand, water pipelines and hoses shall be established and
maintained regularly.
Firefighting arrangements provided shall be suitable to fight the possible type of fire
that may occur depending on the type of flammable material. Fire facilities shall be
placed strategically such that they are accessible from any location of the site without
travelling for long distances. Employees shall be trained on fire prevention and
firefighting measures on a regular basis.
13.3.7. Access Control
It is advisable to establish access control measures at the construction project to
control movement of workmen and visitors. Access control may be achieved by entry
pass, bar-coded cards and biometric systems or other suitable means.
13.3.8. Safety of Visitors
Visitors for the project shall be given health and safety induction before they are
allowed in to the construction project. It shall include the minimum PPE to be used,
hazards and risks at the work area, restricted areas of entry, emergency response
arrangements, etc.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 176
13.3.9. Traffic and Logistics Management
Traffic management plan shall be prepared as a part of the project health and safety
plan at the initial stage of the project to manage the traffic inside the project site.
Traffic management plan shall include:
Measures for segregating pedestrian and vehicle traffic;
Establish project specific traffic rules such as speed limit and one way etc;
Managing the flow of traffic such that blind zones and hazardous junctions are not present;
Managing the flow of traffic such that reversing can be avoided as far as possible; and
Use of traffic control devices such as road humps, convex mirrors, delineators traffic signals and barriers.
It shall be planned to deploy flag man, security personnel and traffic marshals at
critical areas to regulate traffic.
13.4. Occupational Health Management Plan
The process of surface and underground excavation / quarrying leads to some health
hazards. The most significant occupational health impacts are Noise Induced
Hearing Loss (NIHL) and Occupational Lung Disease (OLD) due to inhalation of
dust. Medical examination of employees at the initial stage and periodically, shall be
done by a team of qualified medical officers provided by the project proponent.
Regular medical check-up camps shall also be arranged for detection of
occupational diseases and minor disease in the nearby rural population. Free check-
up and medicine for treatment for their acute and chronic illness shall be provided.
13.4.1. Occupational Health and Safety Management Plan
13.4.1.1 Potential Risk of Sand Project Activities
The surface and underground excavation for the project, by the nature of the
activities involved, are accompanied with risk of medium to high degree involving
blasting. The risks associated with the project are not hazardous, but if any, they are
only accidents and incidents, associated with construction machinery or
transportation activity, if adequate controls or safety systems are not adopted. The
rock excavation by deploying excavators / JCB/loaders/ rock-breakers besides
drilling and blasting and loading on to the trucks by Backhoe can have risks of
accidents if human failure or errors are not taken care of. The Accidents, if any, may
not be fatal, but are potential to cause temporary or permanent disabilities. Thus, the
need for adequate safety at work places is needed. Some minor incidents like
exhaustion, sun-strokes, or other health related incidents may take place, which can
be avoided with adequate safety regulations and measures. Transportation of
construction material, excavated muck for disposal and crushed stone aggregates to
various construction sites are some of the activates associated with accidents on
road and at the project site. However, with effective safety measures the accidents
can be avoided and prevented.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 177
13.4.2. Safety of Machine Use at Project Site
The major machinery to be deployed at site shall be excavators/JCB, Backhoe and
loaders which can excavate earth mix with boulders / rock mass and load on to
vehicles. The area where machinery shall be operated will be under supervision of
trained operators and helpers besides technically qualified foreman to ensure that
the machinery is operated as per specified design parameters of the manufacturer.
Before the work is initiated every day, the routine check-up especially with regard to
its hydraulic systems, mechanical conditions, and other operating systems shall be
performed. The movement of trucks/trippers/tractors for loading /transportation of
material within the project area and haul road area shall be regulated by a trained
supervisor who shall be responsible for the safety of vehicle movement and
prevention of accidents or incidents associated with the vehicular movement. All staff
working with the construction machinery shall be trained in first-aid and other safety
measures, accident or incident prevention and reporting and communication
mechanisms.
13.4.3. Occupational Health & Safety (OHS)
The excavated material and construction material does not contain any toxic
element. Therefore, the likelihood of any health hazard does not arise due to their
handling per se. However, the process of excavation / quarrying leads to some
health hazards. The dust generated due to excavation loading and movement on
Katcha/riverbed haul road creates air borne dust which has silica contents. The dust
is the main pollutant of concern for the workers engaged in the mining activities. The
most significant occupational health impacts are Noise Induced Hearing Loss (NIHL)
and Occupational Lung Disease (OLD) like allergic rhinitis and asthma due to
inhalation of dust. Working in open during summer can expose workers to the direct
sun rays causing heat strokes, cramps and burns besides leading to exhaustion. In
extreme windy conditions the dust particles forcing way into the eyes can create
itching as well as allergic conjunctivitis of eye. Medical examination of employees at
the initial stage and periodically, shall be done by a team of qualified medical officers
provided by the project proponent.
The initial medical examination of every person employed in the mine within a period
of five years of the date so notified and the said examination shall be so arranged
over a period of five years that one fifth of the persons employed at the mine
undergo the examination every year. The periodical medical examination thereafter
of every person employed in the mine shall be conducted at intervals of not more
than five years. In the present case since the lease is only for five years. It is
suggested that the initial medical examination for all workers must be arranged
during the first year of appointment and the periodical check-up during fourth and
fifth year after the appointment.
Regular medical check-up camps shall also be arranged for detection of
occupational diseases and minor disease in the nearby rural population. Free check-
up and medicine for treatment for their acute and chronic illness shall be provided.
The medical examination schedule is provided in Table 13.1.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 178
Table 13.1 : Schedule of Medical Check-up
S.
No. Particular
1st
Year
2nd
Year
3rd
Year
4th
Year
5th
Year
6th
Year Total
1
Initial medical check-up of
employees for lung function,
audiometric test, tuberculosis
and pulmonary disease at the
time of appointment 1050 1050 - - - - 2100
2
Periodical Medical Check-up of
the employees (Audiometric
Test, Eye – Check-up, Lung
function and respiratory test) - - - 700 700 700 2100
13.4.4. Occupational Health & Safety Measures to Control Dust Inhalation
Providing a working environment that is conducive to safety and health.
The management of occupational safety and health is the prime responsibility of
mine management.
Employee involvement and commitment in the implementation of health and
safety guidelines.
Periodical health checkups
Implementing safety and health management system and assessing the
effectiveness through periodic audits.
Monitoring the effects of mining activities on safety and health and conducting
regular performance reviews.
Provision of necessary personal protective equipments.
Establishing and maintaining a system of medical surveillance for employees
Ensuring employees at all levels receive appropriate training and are competent
to carry out their duties and responsibilities.
All the above precautions would be adopted to prevent dust generation at site and to
be dispersed in the outside environment. However, for the safety of workers at site,
engaged at strategic locations / dust generation points like loading and unloading
points, screening sieve, dust masks would be provided. Dust masks would prevent
inhalation of PM10/PM2.5 thereby reducing the risk of lung diseases and other
respiratory disorders. Regular health monitoring of workers will be carried out.
13.4.5. Noise Induced Hearing Loss (NIHL)
Blasting causes intermittent high level of noises whereas the continuous running of
construction machinery / compressors / wagon drills / rock breakers lead to high
noise level in the immediate vicinity of the point of noise emission. Hearing
conservation programmes exists at all operations. Baseline audiogram forms the
basis for future assessment of employees in terms of hearing loss.
Using engineering initiatives to reduce noise at source is the priority management
tool. The hearing conservation programme includes the provision of Hearing
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 179
Protection Devises (HPDs) and annual audiometry examination of all employees.
Apart from provision of HPDs emphasis is also laid on training the employees’
responsibility to protect his / her hearing.
13.4.6. Occupational Lung Diseases (OLD)
There will be regular health camps for all the workers and nearby rural people. Lung
function tests, chest X-rays etc. shall be carried out and any health disorders will be
evaluated. The budget shall be earmarked for the necessary protective devices and
training needs by the project proponent.
13.4.7. Cost Estimate
For initial and periodical medical check-up of employee of the mines, who are
engaged at the active construction site, budgetary provision of Rs. 1000
employee/year shall be made. The provision at this stage is being made for 1200
skilled/semi-skilled / unskilled workers. The cost estimate is provided in Table 13.2.
Table 13.2 : Cost Estimate
S.
No.
Particular Quantity Unit Rate Amount
(Rs. lacs)
1. Initial medical check-up for all workers 2100 Man 1000 21.00
2. Periodical check-up for all workers 2100 Man 1000 21.00
3. Provision for free medicines for all
workers @ Rs. 500/year
2100 Man 500 10.50
4. Provision for personal protection
equipment like helmets, ear plug, dust
mask, shoes, goggles etc., for workers
2100 No. 1000 21.00
Total 73.50
Say 74.00
13.5. Safe Working Procedure:
13.5.1. Demolition:
Before any demolition work is commenced and also during the progress of the work:
Appropriate warning signs shall be displayed for cautioning persons approaching
the demolition area. The area shall be cordoned off properly.
Before demolition operations begin, the Contractor shall ensure that the power
on all electric service lines is shut off and the lines are cut or disconnected at or
outside the demolition site. If it is necessary to maintain electric power during
demolition operation, the required service lines shall be adequately protected
against damage.
Persons handling heavy materials /equipments shall wear safety shoes.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 180
13.5.2. Earthwork in excavation and backfilling:
The Contractor shall take all safety precautions during the execution of awarded
work and shall maintain and leave the site safe at all times.
The Contractor shall ensure the stability and safety of the excavation, adjacent
structures, existing services and the works of other agencies.
Open excavations shall be cordoned off by suitable railing/barricading and
photo‐luminescent warning signals installed so as to prevent persons slipping or
falling into the excavations. Warning signals shall be visible at night also and the
area shall be well illuminated during the work.
All blasting operations, if permitted by Engineer‐in‐charge, shall be carried out on
the basis of procedures approved by Inspector of Explosives. All works in this
connection shall be carried out as per I.S Code of Practice. Barricades,
photo‐luminescent warning signs, etc. shall be placed on the roads/open area.
Prior approval of such operation shall be obtained from Safety
Officer/Engineer‐In‐Charge of Works.
Contractor shall arrange adequate and efficient mechanical dewatering system
as recommended by Engineer‐in‐charge. These pumps shall be inspected and
maintained in proper working condition. The electrically operated pumps shall be
connected to ELCB of proper rating for safety of the person operating/shifting
them.
Contractor shall wash the wheels, of the transport vehicles carrying excavated
soil, with water jet before moving out of the site premises so that there is no spill
over of soil on the existing roads. In case there is any such spill over on the
roads, the same shall be cleaned by the contractor by manual / mechanical
means immediately at no extra cost.
13.5.3. Reinforcement and Concrete works:
13.5.3.1 Concreting:
Proper exhaust ventilation shall be available at the cement store and during
casting work in confined places. PPE for protection of workers viz. respirators,
hand gloves, gumboots, etc. shall be provided by the contractor to the workers
handling cement bags and concrete manually.
The contractor shall provide ear‐muffs to the operator / worker exposed to
continuous high‐level of noise and ear‐plugs to all workers involved in the
concreting work.
Wheels of concrete pump / concrete mixer shall be placed on firm ground /
platform. Pump accessories shall be checked for its safe working pressure
considering maximum pipe line height. A pressure release valve shall be
attached to the pump to release the excess pressure.
The pipeline for transporting the concrete shall have the shortest route with
minimum bends and shall be installed on firm supports at suitable intervals.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 181
Pipeline shall be properly joined with clamps and securely tied to nearby support
and checked in advance before starting the concreting. Pipe segments shall be
cleaned in advance to avoid choking of concrete during casting.
All mechanical equipment/tools used in concreting activity like batching
plant/concrete mixer, concrete pumps, vibrators, etc. shall be operated by trained
person only.
13.5.3.2 Reinforcement:
Bar bending and cutting yard shall be properly cordoned / barricaded and entry
shall be restricted.
Re‐bar bending and cutting machines shall be handled by trained operator /
skilled workers.
Shifting of cut re‐bars shall be done by mechanical means as far as possible.
When re-bars are shifted manually, it shall be done with proper care and proper
balance shall be maintained. Clear access shall be provided for shifting of
re‐bars.
Proper support shall be given to the column bars by means of rings / props
against undesirable sway.
Free ends of the binding wires shall be bent inside to avoid injuries.
Proper PPE viz. leather / cotton hand gloves, goggles, etc., for the people
handling / shifting and cutting / tying of re‐bar, shall be used for protection from
injury and other occupational diseases.
13.5.3.3 Formwork for concreting:
Shuttering and supporting members viz. props, tie rods, etc. shall be of adequate
strength to support the load / pressure of concrete and the formwork scheme
shall be approved by Engineer‐In‐Charge in advance. The procedure approved
by Engineer‐In‐
Charge shall be followed for mixing, transporting and pouring of concrete.
While removing formwork from vertical surfaces, the shuttering board shall be
adequately supported by props, in order to prevent the same from toppling /
slipping, until it is lowered on ground safely. Same support with props shall be
provided during erection of formwork too until the plywood is secured in desired
place with tie rods.
13.5.4. Scaffolding and Working at Height:
13.5.4.1 General:
All the workers, supervisors and engineers of the contractor, who will work at
height, shall have valid height passes issued by the Safety Officer.
The scaffold to be erected for working at height shall be designed for the
estimated load.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 182
The erected scaffold shall be inspected and cleared by the safety officer of the
contractor.
The scaffold shall be checked for its condition i.e. it shall be free from bends,
cuts, rust, etc. All vertical members shall be in plumb and correctly spaced. The
joints of vertical and horizontal members shall be properly connected with
couplers, lock pins, etc. The scaffold shall be securely tied with permanent
structure as per the requirement of IS:3696 – 1991 (Part 1) (Reaffirmed in 2002).
The working platform and the access to the scaffold shall be free from all debris
and loose materials.
Contractor shall provide necessary PPEs as per relevant I.S. Codes for the
workers working at height viz. full harness safety belt, fall arrestor, kinetic shock
absorber, safety helmet, gloves, etc.
13.5.4.2 Working platform:
The quality of wooden planks or MS grill plates for decking of working platform
shall be made of good quality material and free from any defects, etc. The load
carrying capacity of the working platform shall be designed in consultation with
Engineer‐in‐charge. Working platform, gangways and stairways shall be so
constructed that they shall not sag unduly or unequally.
All working platforms shall have guard rails at 1.0 m height with middle rails at
0.5 m height from the platform and 15 cm high toe boards securely tied with the
vertical posts.
The spacing of vertical posts shall not exceed 2.0 m Centre to Centre.
The contractor shall provide grab rope / life line all around the working
platform/level, at height, which will provide tying / anchoring facility for the safety
belt / fall arrestor.
Contractor shall provide safety net under all working platform/level at height to
protect fall of men and materials from above and such safety nets shall conform
to IS:11057‐1984.
Adequate precautions shall be taken to prevent danger from electrical lines and
equipment. Scaffolding, ladder, working platform, gangways, etc. shall not exist
within 5m of any un‐insulated electric wire. Whenever electric power and lighting
cables are required to run through (pass on) the scaffolding or electrical
equipments are used, such scaffolding structures shall have minimum two earth
connections with earth continuity conforming to relevant IS Code of Practice.
13.5.4.3 Ladder:
Safe means of access shall be provided to all working platforms and other
elevated working places with the help of ladders.
Ladder shall be placed in an inclination not steeper than 1 in 4 (1horizontal and 4
vertical).
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 183
Every ladder shall be securely fixed at bottom from sliding/slipping.
13.5.5. Construction machinery and Tools:
The operation and maintenance of any construction machinery shall be as per manufacturer’s guidelines & checklists and by trained personnel only.
13.5.5.1 Earth moving machinery:
The contractor shall ensure the stability of the equipment, while working, depending on the load bearing capacity of the ground; which may reduce due to presence of moisture and due to vibration effect. The contractor shall provide bearing plates, packing, etc. to strengthen the ground below outriggers or wheel or crawler of the equipment. All earth moving equipment shall have Roll Over Protective Structures, sound suppressers, seat belts, reverse alarms, warning horns, windshield wipers and easily approachable control and lever for brake system and emergency stop. They shall be checked at the time of delivery and they shall be properly maintained. Contractor shall display warning sign for keeping away from the moving parts of such equipment and the area of operation of such machinery shall be properly cordoned. The shovel / bucket of the earth moving equipment shall be rested on ground when the equipment is not working. Operation of such equipment shall always be carried out by trained operator accompanied by the designated helper.
Bulldozers: The blade of Bulldozer shall be inspected at least once in a week. The blade shall not be used as a brake except in emergency. The position of the blade shall be adjusted while travelling up or down the gradient. The Bulldozer shall be parked on levelled ground, by applying hand brakes and by lowering blade.
13.5.5.2 Lifting and hoisting machinery:
Lifting machines and tackles shall be of good mechanical construction, sound material and adequate strength and free from any defects and shall be kept in good repair and in good working condition. Every rope used in hoisting or lowering materials or as the means of suspension shall be as per manufacturer’s guidelines, of good quality and adequate strength and dimension and free from any defect. Test certificates of such ropes,
D‐shackles, etc. shall be submitted in advance by the contractor.
Every crane operator or lifting appliance operator shall be properly qualified. No person under the age of 18 years shall be in charge of any hoisting machine or to give signal to operator of such machine.
The base of such hoisting equipment shall be kept in perfect horizontal condition since any tilt would reduce the load carrying capacity of the equipment. The foundation shall be firm enough to support the equipment. The level shall be checked every day before starting the work in case of mobile hoisting equipment.
Thorough inspection and load testing of lifting machines and tackles shall be done by a third party, at least once in every 12 months and the records of such inspection and testing shall be maintained and a copy shall be submitted by the contractor to the departmental representative at site. Motors, transmission, couplings, belts, chain drives and other moving
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 184
parts of hoisting appliances shall be provided with adequate safeguards. Hoisting appliances shall be provided with such means as it shall minimize the risk of any part of a suspended load becoming accidentally displaced or lowered.
13.5.5.2.1 Tower Cranes: Erection & Commissioning
The type of the tower crane to be used shall be selected based on the load to be lifted, the reach of the boom and the height at which the material is to be shifted. The contractor shall follow all the safety instructions given in the manufacturer’s manual for erection, dismantling or extension (jumping) of tower cranes. The contractor shall submit the operation manual, provided by the manufacturer, to the departmental representative before erection of the same at site. For both movable and fixed tower cranes, the adequacy of the counterweight shall be ensured. The base of the tower crane shall be in perfect horizontal level. Base shall be capable of bearing the loads during the operation of tower crane.
Operation – The crane shall never be used to pick the loads which are out of the crane’s reach or to do skew pulls of any sort. The load (to be lifted by the crane) shall be free from any sticky characteristic which may cause sudden jerk while lifting. No worker / person shall be lifted by tower crane. Any kind of swinging of lifted load, to put them out of crane’s reach, shall not be tried. The operator shall not reverse the motor in order to achieve quicker stop to save time. He shall execute one operation at a time only and shall never combine horizontal movement of trolley with vertical movement of lifting hook. Tower crane shall be protected from sway due to wind load, etc. during operation. Precautions in high wind load shall be taken as per manufacturer’s guide. Various components and parts of the tower crane like wire ropes, pulleys, structural members of the tower and boom, etc. shall be periodically checked and properly maintained by the mechanical engineer of the contractor. Proper lighting arrangement with the boom and the tower of the crane shall be provided as safety arrangements for clear visibility during night. The tower crane shall be provided with the siren / horn facility in order to caution the workers in vicinity during operation of the crane. The operator shall take “START” and “HOISTING” signal from the designated helper / supervisor only; however, “STOP” signal can be taken from anyone.
Maintenance ‐ The balancing rope, trolley rope, hoisting rope and erection rope shall be checked as per maintenance guidelines given by the manufacturer and they shall be replaced immediately as and when required. For regular maintenance, the manufacturer’s manual shall be followed.
13.5.5.2.2 Mobile Cranes:
The contractor shall take care that, the engine of the crane shall be kept running with the gear engaged and maintain a slow speed, while moving down the hill. While travelling uphill or downhill, the boom shall always be kept downhill in order to prevent the boom from falling back. The soil of working area, movement area and parking area of the mobile crane shall be well compacted and shall have proper drainage arrangement. The area shall be dry, levelled and firm enough to hold the load of the mobile crane. The lifting hook shall be tied / anchored while the crane is moving or not operational. Before starting operation at the beginning of day’s work, the capacity load shall be picked up to 0.3 m above the ground to test the drift, if any, due to faulty brakes. The brakes shall be ‘ON’ when a rubber tyre crane is operated. The operator shall always avoid any jerky start or a fast
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 185
swing during operation of the crane since it increases the risk of overturning of the crane. The pressure in the pneumatic tyre shall be maintained correctly in all wheeled machines.
13.5.5.3 Transporting Machinery:
Trucks, tippers, dumpers used in transportation of excavated earth or other materials; which are loaded with mechanical excavators, shovels / loaders shall have strong canopies over the driver’s cabin to protect them from injuries while loading. The driver’s cabin for all the vehicles at construction site shall have a system of sound and vibration suppression, seat belts, reverse horn/alarm, rear view mirror, wide windshield, triplex glass, wiper, sun visor, etc. Brakes and control shall be designed so as to get locked when the vehicle is parked. While going down the gradient, the speed of the vehicle should be controlled. Hydraulic retarder shall be used for big dumpers. Persons holding valid driving licenses for heavy motor vehicle shall be engaged as drivers of the respective type of vehicles. Every dumper, tipper, truck, etc. shall be accompanied by helper and driver shall take all signals from his helper only. The access road of such transport vehicle shall be firm and levelled as far as practicable and shall be free from any obstacle.
13.5.5.4 Batching plants:
The batching plants shall be calibrated by the contractor at least once in a month and such records shall be made available to the departmental staff for record.
The installation, operation, maintenance and decommissioning of batching plant shall be done as per manufacturer’s guidelines and manuals. All electrical works and connections shall be done by a licensed electrician under supervision of electrical engineer of the contractor. The DG requirement (in case of power cuts) shall be of at least 150% of the overload capacity. The operations of hopper, scrapper and pan mixer shall be smooth and periodic inspection shall be done as per manufacturer’s guidelines. The material bins shall be checked periodically for presence of any boulders, lumps, etc. which may choke in the hopper causing disruption of operation of the batching plant. Proper care shall be taken during feeding cement silo from the bulker for any loose joints in the feeder pipe and pump of the silo. The silo shall have a guarded monkey ladder for access to the top. The person accessing the top of silo shall seek work permit in advance and shall use proper PPE while climbing. The outer surface of the silo shall be properly painted and maintained against weathering effects. The contractor shall make available at least one fire extinguisher near the operator cabin of the batching plant and the same shall be maintained in good condition at all times. The operator cabin and the scrapper cabin shall be well ventilated and dust proof. The underground water tank/Vat of the batching plant shall be covered with suitable protective cover and shall be cordoned all around.
13.5.5.5 Hydraulic machines:
Hydraulic operated machines like mechanical excavators, jacks, or any other hydraulically operated parts, etc. shall be handled carefully. The pressure relief valves mounted on the Hydraulic construction equipment shall not be tampered. These machines shall be equipped with the foam based fire extinguisher. These machines shall be maintained at regular intervals as per the manufacturer’s manual, to avoid failure of brakes, hydraulic system, etc. Regular checking shall be done for such equipment for any leakage, condition of the hoses and
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 186
connections, etc. Contractor shall give proper training to the operator, mechanic, etc. before they handle the equipment.
13.5.6. Dewatering pumps, Concrete pumps, Boom placer pumps:
The rotating parts of the dewatering pump shall be well guarded. Only authorized operator / mechanic shall operate the pump on requirement. He shall not wear any loose clothes while operating the pump. The exhaust of the smoke shall be away from the workers working in the surrounding area. The pump shall be operated and maintained as per the manufacturer’s guidelines.
For electrically operated dewatering pumps including submersible pumps, special care shall be taken while operating them. Such pumps shall be fitted with ELCB of proper rating. The power shall be put off before shifting or removal of the submersible pumps.
Only authorized operator / electrician shall be allowed to operate the same.
13.5.6.1 Stationery Concrete Pumps and Boom Placer pumps:
The commissioning, operation and maintenance of concrete pumps (both stationery and boom placer type) shall be done as per manufacturer’s guidelines or manual provided along with the equipment. The safety procedure and tips as mentioned in these guidelines shall not be violated. A copy of such manuals shall be submitted to the department before installing the equipment at site. Apart from manufacturer’s manual, the following guidelines shall be followed for operation and maintenance of the concrete pumps:
The operation, maintenance and signalling of concrete pumps shall be done by trained and authorized personnel having minimum 18 years of age.
Place of work shall be so selected that the visibility of batching plant operator/transit mixer driver, concrete pump operator, signal man/supervisor and hose man (at the pouring point) is ensured all at a time. In case such visibility between all the above people cannot be ensured, then at least the pump operator shall be able to see the batching plant operator and signal man separately. The pump operator shall play most important role in pouring and he shall be properly trained by the safety officer/site Engineer of the contractor to understand the signalling process properly in order to ensure smooth concreting activity at site.
When the concrete is being placed in the hopper of the pump (either from batching plant chute or transit mixer chute), no person shall climb on the hopper of the pump.
The danger zones (within working area) like hose end position, beneath the placing boom, moving parts of the concrete pump and its hopper, its support legs and the area of the concrete pipe line, etc. shall be identified by the safety officer/ mechanical engineer in advance. Accordingly these areas shall be cordoned and restricted movement shall be ensured as practicable as possible.
The concrete pipeline (delivery system) for stationary pumps shall be checked by the mechanical engineer before he seeks work permit for concreting activity, for proper clamping of the pipe joints, supports for pipe line, etc. The pipe line shall have minimum number of bends and shall be straight as far as possible. In case pipe line needs to change the direction, then there shall be at least 5 m straight
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 187
portion just after the concrete pump. The bends in the pipe line shall be as smooth as possible.
Inspection interval shall be decided based on manufacturer’s guide line, age of the concrete pump, quantity of the operating hours and output of concrete.
Personal protective equipments like helmet, safety shoes, ear defenders (ear muff/ ear plug), protective gloves and goggles, face mask/respiratory protector, etc. shall be arranged by the contractor for all the workers working on concrete pump.
Concrete pump shall have suitable pressure relief valve, set at a predetermined pressure level, in order to ensure safety of the workers as well as the pump.
13.5.7. Structural Steel Fabrication:
13.5.7.1 Welding and Gas Cutting:
Welding and gas cutting operations shall be done only by qualified and authorized persons and as per IS: 818‐1968 (Reaffirmed in 2008). No hot job shall be done without approved work permit.
Welding and gas cutting shall not be carried out in places where flammable/any materials such as combustible/flammable chemicals, dyes, hessian cloth, wooden pieces, cylinders, etc. are kept within 10 m from the spot of fabrication or gas cutting.
13.5.7.2 Electric Arc Welding:
For Electric Arc welding the following additional safety precautions shall be taken:
All power connections shall be routed through ELCB of proper rating and machine connections shall be through MCB. Double earthing shall be provided to the welding machine. A provision of a separate return path shall be ensured. ii) The cable to be used shall be of adequate capacity corresponding to output of the welding transformer / generator and shall be routed through dry isolated path. Welding cable terminals shall be provided with lugs and connected properly. Proper insulation of cable with insulation tape of approved quality shall be ensured and only double insulated cable shall be used. Extension of welding cables shall be done using standard connectors. iii) Pipe lines carrying flammables shall not be used as part of earth conductor, but a separate earth conductor shall be connected to the machine directly from the job. Painting and Dye Penetration testing shall not be done near electric arc welding. iv) Personal contact with the electrode or other live parts of electric welding equipment shall be avoided. Wires and cables shall not be hung from any metal hook.
Accidental contact of electrodes with ground shall be prevented.
The welding cables shall not be allowed to get entangled with power cables. It shall be ensured that the cables are not damaged by movement of materials. Dragging and coiling of cable shall be avoided. vii) For Dye Penetration test, necessary care shall be taken so that there is no hot job going on nearby. Place of the test shall be well ventilated.
13.5.7.3 Erection:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 188
Only trained operators and workers shall be engaged for the erection of structural fabricated members. For erection by mechanical means, the safety procedures shall be followed in addition to the following guidelines:
The heavy materials shall not be manually handled. They shall be handled and shifted by mechanical means like crane, hydra, trolley, etc. of adequate capacity.
All mechanical transport devices and erection equipment shall be operated with the assistance of a helper / supervisor exclusively for proper signalling.
While erecting fabricated members, suitable guy rope arrangement shall be made to avoid sudden toppling of derrick.
Chain pulley block, D‐shackles and wire ropes (lifting appliances) shall be of rated capacity at least 2.0 times more than the maximum desired load to be lifted. Hooks, jigs and fixtures used shall be marked with their capacities.
Two or more slings shall be used for lifting the loads and they shall be tied as per the centre of gravity of the load to be lifted.
13.5.8. Electrical Safety:
Guide lines for providing temporary power supply at the site and general safety procedures for using electricity are given as under. Following safety requirements shall be complied with before the Contractor uses the power supply.
The Contractor shall submit a list of licensed electrical staff to be posted at site. It shall be the responsibility of the Contractor to provide and maintain complete installation on the load side of the supply point about the safety requirements at site. All cabling and installation shall comply with the appropriate statutory requirements given below and shall be subject to approval of the Departmental Engineer‐in‐charge/ Electrical Engineer.
The Electricity Act, 1910 (as amended in 2003)
Electricity (Supply) Act, 1948
Indian Electricity Rules, 1956 (as amended in 2005)
National Electric Code 1985 (as amended in 2005)
Other relevant rules of Local Bodies and Electricity Boards
13.5.9. Fire Safety:
The contractor shall take all necessary precautions to prevent outbreak of fires at the construction site. Adequate provisions shall be made to extinguish fires should they still break out.
Quantities of combustible materials like timber, coal, paints, etc. shall be the minimum required in order to avoid unnecessary accumulation of combustibles at site.
Containers of paints, thinners and allied materials shall be stored in a separate room which shall be well ventilated and free from excessive heat, sparks, flame or direct rays of the sun. The containers of paint shall be kept covered or properly fitted with lid and shall not be kept open except while using.
Fire extinguishers suitable for the different classes of fire such as Class A, B, C &
D as per IS: 2190‐1992 (Reaffirmed in 2010) shall be made available at the appropriate places in the construction site. The date of last maintenance of fire
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 189
extinguisher shall be displayed properly on the same by using maintenance tag. The fire extinguishers shall be sent for maintenance/refilling at least once in 6 months or whenever exhausted. The safety officer shall inspect the condition of the plunger, safety pin, switch grip, hose tube, etc. at least once in a month and
report shall be submitted to the departmental representative as per the format enclosed as Annexure 14.
Adequate number of contractor’s workmen and supervisors shall be given training in fire fighting and extinguishing methods.
The safety officer of the contractor shall plan for site evacuation in fire emergency in order to facilitate to easy and safe exits for entire site work force and supervisory staff. He shall identify and train the designated staff or supervisor for specific role in site evacuation plan.
The telephone number of the nearest fire station shall be displayed at suitable locations (near telephone, main entrance of the site, first aid centre, stores, etc.) in bold distinct font.
13.5.9.1 Housekeeping:
The Contractor shall promote and upkeep the practice of good housekeeping throughout the contact period in order to create a safe and hygienic working environment at site. The contractor shall maintain a separate housekeeping team of workers and supervisors who shall maintain the hygienic conditions at site. He shall at all times, keep his work spot, site office, labour toilets and surroundings and roads clean and tidy from rubbish, scrap, surplus materials and unwanted materials, tools and equipment. The contractor shall follow the recommendation of IS: 4082‐1996 (Reaffirmed in 2003) for stacking and storage of construction materials and components at site.
After the completion of the work, the contractor shall have removed from the work premises all scaffoldings, surplus materials, scrap, rubbish and all temporary structures, huts and sanitary arrangements used/installed for his workmen at site. The contractor shall stack all undesirable materials and debris to the designated area at his own cost, as directed by Engineer‐in‐charge.
13.5.9.2 Common Hazards:
Barricading and Sign Boards: All work areas around excavated pits, trenches, openings, scaffolding, vehicle movement areas, etc. shall be well cordoned / barricaded with the help of railing, safety tapes (photo luminescent), etc. Photo luminescent sign boards and warnings shall be displayed at required locations and they shall be clearly visible from a distance even at low or no illumination.
Noise: Suitable ear protection (ear muff) shall be provided to the workers, who are exposed to high noise levels (85dBA and above), e.g. concrete pump operator, vibrator operator, batching plant operator, air compressor operator, grinding machine operator, breaking rocks with pavement breaker, etc. The exposure duration in case of these workers shall be restricted. Other workers and staff who are in the close vicinity of high noise level such as unskilled worker engaged in concreting works, etc. shall be provided with ear plugs.
Area Illumination: Adequate lighting facilities such as flood lights, halogen lamps, hand lights and area lighting shall be provided by the contractor at the site of work, storage area of materials and equipment and temporary access roads
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 190
within his working area. The intensity of illumination shall depend on the nature of work and the same shall be planned by the contractor in advance based on the recommendations of Hand Book on Functional Requirements of Industrial Buildings (Lighting & Ventilation: SP32‐1986).
Dust and fumes: Confined areas like main access tunnel (MAT), adit to different underground components of the project like HRT, Surge Shaft, etc. shall be
under forced ventilation (using blowers) for at least 3‐7 air changes per hour depending on presence of dust and fumes generated from grinding, gas cutting, welding, etc. Adequate measure like dust extractor/arresters shall be available for use to prevent spread of dust to nearby areas during open area operations. Workers shall be rested for sufficient time after every one hour of continuous working in dust. The same worker shall not be engaged for many days continuously and they shall be engaged/kept on job rotation. All necessary PPEs like dust respirators, safety goggles, hand gloves, ear plugs, protective clothes, etc. shall be provided. Any illness due to continuous work in dust or fume shall be immediately reported to the First Aid Centre.
The cost components for ensuring certain measures for safety of labour during construction has been enumerated in Table 13.3.
Table 13.3 : Cost Estimate
S. No. Particular Amount
(Rs. lakh)
1. Cost of Barricading work areas around excavated pits, quarry
area/muck disposal sites
10.00
2. Cost of Caution and Sign Boards 2.00
3. Cost of Fire extinguishers 3.00
4. Implements for housekeeping in site offices and work site 2.00
5. Illumination facilities in work area 5.00
Total 22.00
13.6. Cost Estimate for Occupational Health and Safety Management During Construction
The cost components for ensuring occupational health and measures for safety of labour during construction has been enumerated in Table 13.4.
Table 13.4 : Cost Estimate
S. No. Particular Amount
(Rs. lakh)
1. Cost estimate for Occupational Health Management (Table
13.2)
74.00
2. Cost of Safety management during construction (Table 13.3) 22.00
Total 96.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 191
14. SANITATION AND SOLID WASTE MANAGEMENT PLAN 14.1.
14.1. Introduction
During the construction phase of the project, there will be an influx of technical staff,
laborers and other service providers into the project area. The proposed project has
also envisaged four colonies to house project employees including personnel for
other utility services with their families. Sewage and solid waste will be generated
from the colonies. It is very essential that from the planning stage, sewerage
management and solid waste disposal facilities should be conceptualized to maintain
the health of the people and the environment. The main sources of wastes in case of
the proposed project can be divided into following categories:
Municipal waste from residential areas
Solid wastes from labour camps
Bio-medical wastes from Dispensary
Since most of the dam operations shall be automated or mechanized, very few
people shall be staying in the project during the operation phase. The solid waste is
primary problem during the construction phase of the project. Solid waste generated
from temporary and permanent colonies in construction as well as operation phase
requires special management to dispose off as warranted under the Municipal Solid
Wastes (Management and Handling) Rules, 2000.
14.2. Responsibilities of Project Authority
The project authority shall, within the territorial area of the project complex/ colony,
be responsible for the implementation of the provisions of Municipal Solid Wastes
(Management and Handling) Rules, 2000 issued by MOEF vide so 908 (E) dated 25,
September, 2000, and for any infrastructure development for collection, storage,
segregation, transportation, processing and disposal of municipal solid wastes.
Any municipal solid waste generated in the project complex/ project colony/ labour
colony, shall be managed and handled in accordance with the compliance criteria
and the procedure laid down in Schedule –II under rules 6 (1) and (3), 7 (1) of the
Notification dated 25 September, 2000. The management plan has, therefore, been
framed taking into consideration compliance criteria against each parameter as set
out under Schedule-II, some of which are described in the foregoing paragraphs.
14.2.1. Collection of Municipal Solid Wastes
The project authorities shall prohibit littering of solid wastes in the area under their
control by resorting to following: -
Organizing house-to-house collection of solid waste on regular pre-informed timing and scheduling through any of the methods, like community bin collection (Central bin).
Devising collection of wastes from office complexes, hotels and commercial areas.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 192
Avoiding mixing of Bio-medical wastes with municipal solid wastes.
Collected waste from residential areas shall be transferred to community bin by hand-driven containerized carts or other small vehicle. Horticulture and construction / demolition wastes or debris shall be separately collected and disposed off.
Waste like dry leaves shall not be burnt.
Collection of wastes from vegetable and fruit shops and meat shops and also dry leaves collected from avenues/ parks, which are biodegradable in nature to be finally disposed off through aerobic composting in composting units of size 8 m x 2.5 m built from bricks. The compost thus obtained shall be used for development of flower beds and avenue plantation around colonies and office areas and also in biological measures to be adopted in respect of soil tips
developed at muck disposal sites.
14.2.2. Segregation of Municipal Solid Wastes
The project authority shall organize awareness programmes to encourage the generators of wastes and to ensure community participation in waste segregation. For this purpose regular meeting at quarterly intervals shall be arranged with
representatives of resident of colonies.
14.2.3. Storage of Municipal Solid Wastes
The project authority shall establish and maintain storage facilities in such a manner as they do not create unhygienic and insanitary conditions around it. Following criteria shall be taken into account while establishing and maintaining storage facilities. Storage facilities of bins shall have ‘easy to operate ‘design for handling, transfer
and transportation of waste. Bins for storage of bio-degradable wastes shall be painted green, those for storage of recyclable wastes shall be painted white and those for storage of other wastes shall be painted black.
Manual handling of waste shall be prohibited. If unavoidable due to constraints, manual handling shall be carried out under proper precaution with due care for
safety of workers.
14.2.4. Transportation of Municipal Solid Wastes
Vehicles used for transportation of wastes shall be covered. Wastes should not be visible to public, nor exposed to open environment preventing their scattering. Transportation vehicles shall be so designed that multiple handling of waste, prior to
final disposal, is avoided.
14.2.5. Processing of Solid Wastes
The project authorities shall adopt suitable technology or combination of such technologies to make use of wastes so as to minimize burden on landfill. Following criteria shall be adopted: -
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 193
The biodegradable wastes shall be processed by composting, vermi-composting, anaerobic digestion for stabilization of wastes.
Mixed waste containing recoverable resources shall follow the route to recycling. Incineration can also be used for processing wastes.
14.2.6. Disposal of Municipal Solid Wastes
Land filling shall be restricted to non-biodegradable inert waste and other waste that are not suitable for recycling or for biological processing. Three landfill sites, one on the d/s of the dam near km below Kishtwar-Gulabgarh road and one is on the u/s of the dam near village Kadhel and Atholi will suffice.
14.2.7. Municipal Waste from Residential Areas
The permanent and temporary project colonies for staff shall be created. The colonies will have family accommodations, bachelor’s accommodation besides accommodations for floating population. The total expected population in the project colony will be 1200 persons. In the colony, use of plastic bags be discouraged and use of biodegradable cotton and jute bags be encouraged. The average solid waste generated in the colony has been assumed to be approx 0.75 kg [dry-weight]/ per person/day. Thus, the solid waste generated by 1200 persons in the project colony on average daily, weekly, monthly and annual basis is given in the Table 14.1.
All households need to be instructed to sort their wastes and store the food, biodegradable and non-biodegradable wastes viz. bottles, cans etc in separate containers. Two numbers of doorstep waste collectors per house will be arranged and given to each family. A handcart shall be deployed to collect the wastes from the doorsteps daily.
Table 14.1 : Solid Waste Generated from Project Colony (kg dry weight)
Garbage Generation Per Day(kg) Per Week(kg) Per Month(kg) Per Year(kg)
Per Person 0.75 5.25 22.5 270.00
By 1200 persons 900 6300 27000 2268000
The collected biodegradable wastes will be disposed off at a suitable landfill site, to be developed. The area will be properly fenced to avoid animals to feed on the wastes. The organic waste collected will be suitably processed to form compost. The compost thus produced shall be utilized in parks and plantation area around colony. The recyclable (non- biodegradable) wastes can be collected at a place and can be incinerated at regular interval of time. Apart from this, there will be provision for cleaning the streets of the colony to keep the surrounding area clean.
Considering water requirement of about 70 liter / head / day in hilly areas and on an average a person generates about 50 lit. of sewage per day and therefore, about 60,000 lit. /day of domestic sewage along with other waste are expected to be
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 194
generated from the colony. In the light of the fact that conventional septic tank system, which is too expensive and requires a large volume of water for flushing and is also riddled with problems like periodic cleaning and disposal of sludge, flush compost toilet which requires only 1.5-2.0 liters of water for flushing as against 12 to 14 liters in case of former shall be resorted to. Flush toilet is eco-friendly, technically appropriate, socio-culturally acceptable and economically affordable. Flush compost toilet shall be adopted in residential area. For inspection houses / office areas Thermophillic Aerobic Composter which requires only 6 to 10 days to make compost from any biodegradable waste, without any manual handing during composting shall be adopted. Adequate provision shall have to be earmarked under the sub-head “O-Miscellaneous” as the capital cost of sewerage disposal and storm water drainage
and O & M charges respectively.
14.3. Solid Waste from Labour Colony
The executing agency shall ensure employment to bona fide Kashmiries in all the
unskilled / skilled and other non-executive categories of staff with the contractors and
sub-contractors as may be required for implementation of the project. If it is not
possible to recruit 100% staff from local populace for justifiable reasons, then not
less than 50% of the total employees from bona fide residents’ shall be adhered to.
About 2100 workers (labour and staff) would be engaged temporarily during peak
construction period. It is expected that 50% of the total work force shall be locally
available from adjacent areas and thus labour colony shall be designed to house
1050 workforces.
The labour colonies shall be located at nine different sites in the project area. Around 175 labourers are expected to reside in the labour colonies with their families and 875 numbers in bachelor accommodation at any given time, during the peak construction phase of the project. Proper care has to be taken to manage the solid waste generated from the labour colony for a population of 1300 residential persons and 50 floating population i.e. for 1350 persons. It is estimated that total solid waste generation per day by labour population residing in the labour colony would be approximately 1170 kg dry weight. This would be to 35100 kg dry weight, and 421200 kg dry weight per month and per annum respectively. For maintaining the cleanliness of the labour colony and to restrict from disposing the solid waste into the river, this solid waste management plan has been formulated. No dumping of solid waste should be allowed near any water body or nalla. For solid waste collection 12 iron storage vats, each of 5 cum capacity, will be located at convenient dumping locations in the colonies. Each vat will have the capacity of holding 500 kg dry weight of garbage, which will be emptied at regular time intervals and the biodegradable waste will be transported to the landfill sites. Use of plastic bags need to be totally banned in the labour colony. Periodical awareness should also be provided in order to avoid use of plastic bags. Proper sanitary facilities would also be provided at the labour colonies. The standard municipal designs for community sanitation facilities in hill areas have been taken into consideration while formulating the sanitation scheme for the labour colony. Flush compost toilets shall be provided for 175 residence of workforce besides eight
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 195
community latrines of five-seated unit each with three bathrooms constructed at appropriate locations at a cost of Rs. 15.0 lac per unit having a total cost of Rs. 120.00 lac. The financial provision for this purpose has been provided in cost estimate for solid waste management in Table 14.2. Generally, from landfill, there is little risk for generation of methane, due to the decay of vegetable matters, as it slowly diffuses at low concentration through the covering material. The most serious risk from sanitary landfill is that of pollution from leachates. Hence, the bed of the disposal sites should be covered with an impervious material to ensure that leachate does not lead to soil and water pollution. During long dry periods the surface of a sanitary landfill can become dusty, causing discomfort to locals in and around such sites. Covering of the disposed material would prevent entrainment of fugitive emissions as well. Paper and other material also flies off the landfill area due to wind currents. This often creates a nuisance in the immediate vicinity of the landfill site. The landfill site, therefore, needs to be skirted with wire fence of about 3 m high with paper catchers to avoid fly of papers. Once the landfill operation is complete, the entire landfill site is to be suitably capped by an impervious material like clay. To ward off entries of dogs and monkeys, the landfill site shall have welded wire fencing all around. Proper provision for water storage in sufficient quantities will be needed to maintain hygienic environment. Septic tanks of appropriate size be constructed and care be taken to avoid mixing of wastewater and sewage with local water body especially during rainy season. Apart from the municipal solid waste in labour colony of project area, a lot of waste is expected to be generated on account of construction activities mainly consisting of cement bags, iron scrap, packing material, etc. It is expected that most of the iron scrap and packing material would be recycled since it has reuse value apart from monetary values and hence, it is proposed that stipulations should be imposed on suppliers and contractors to take away the scrap and packing materials. Apart from above, substantial cement will be required for constructional works. Since cement is supplied in 50 Kg plastic bags, a large number of plastic bags would require proper disposal through annual public auction with a provision of monthly disposal of such bags. Iron scraps have a resale value and therefore these shall be auctioned to steel re-rollers.
14.4. Bio-Medical Wastes from Hospitals
In view of proposed hospital to be located at proposed permanent colony in the project area, the hospital waste management should be considered a priority. All kinds of hospital waste are considered as hazardous waste. Hospital waste is generated during the diagnosis, treatment or immunization of human beings. It may include waste like scrap, anatomical waste, culture media, discarded medicines, chemical waste, syringes, swabs, bandages, body fluids, human excreta, etc. This waste is highly infectious and can be serious threat to human health if not managed in a scientific and discriminate manner. It is expected that generation of such hazardous waste will be very less. For management, special type of collection container and incinerator should be placed near the hospital for proper collection and disposal of hospital waste. Hospital waste should be incinerated or buried at isolated, identified sites, strictly in accordance with the provisions of the BMW Rules. Any kind of hospital waste should not be either recycled or reused. Incinerator/Autoclave is also a legal requirement for hospital waste management so that the non-
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 196
biodegradable waste generated from colony as well as hospital can be scientifically disposed. One incinerator must be installed at suitable site in permanent colony for reduction of total volume of non-biodegradable solid waste.
14.5. Sewage Management in Nearby Villages
Sewage Treatment Plants shall be provided for Sohal, Gulabgarh, Dhundhi, Mati, Kol and Arthal villages where the untreated sewage is being discharged directly into the
Chenab through local nalas.
14.6. Cost Estimate for Solid Waste Management
The overall cost estimates for the management plan is shown in Table 14.2.
Table 14.2 : Cost Estimate for Solid Waste Management Plan
S.
No.
Description Qty. Unit Rate
(Rs lac)
Amount
(Rs. in lac)
1. Flush composite toilets for labour colony 175 No 0.20 35.00
2. Community toilet with 5 seats with
Effluent Treatment system
8 No 15.00 120.00
3. Cleaning worker for 5 years (15 x 12 x
5)
900 Man
months
0.08 72.00
4. Door step plastic dustbin 40 liter
capacity @ 2 No/family including one
time replacement
3000 No 0.004 12.00
5. Waste collection handcarts including
one time replacement
80 No 0.03 2.40
6. Landfill R&M LS 30.00
7. Implements such as. Brooms, spade etc
and R&M
LS 1.00
8. Anti malarial and anti insecticides
equipments & spraying material
LS 2.00
9. Iron storage vat (3.1 m x 1.25 m x 1.25
m)
12 No 1.0 12.00
10. Maintenance of 2 Trucks @ Rs 0.30 /
month for 60 months
120 Truck
Months
0.65 78.00
11. O & M charges of incinerator @ Rs. 1.0
lac / year for 5 years for one incinerator
5 No. 1.40 7.00
12. Developing simple composting unit with
size 7.5 m x 2.2 m, three chambered
build from brick
1 No. 1.50 1.50
13. Solid waste management in villages 5 No. 20.00 100.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 197
S.
No.
Description Qty. Unit Rate
(Rs lac)
Amount
(Rs. in lac)
14. Capital cost of one incinerator 1 No. 20.00 20.00
15. Contingency LS 7.00
Total 499.9
Say Rs 500.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 198
15. LOCAL AREA DEVELOPMENT PLAN
15.1. Introduction
The project developer would aim at the improvement in the living standards of
inhabitants in the project area not only by being a catalyst for development but also
by developing infrastructure in the area. The infrastructure development will be in
addition to the rightful compensation to the project affected families. Besides meeting
the mandatory requirement, certain works relating to social welfare and community
development are also considered in consultation with local authorities and
representatives of Gram Panchayat of project affected area where in the project area
is covered, so that more acceptability for implementation of the plan is achieved. A
provision of 0.5% of the capital cost of project shall be made for local area
development activities to be financed by the project developer as corporate social
initiative.
As large scale investment is being made in the area by way of construction of
hydropower project, benefits should reach to the local population so that there is
remarkable improvement in their quality of life. Provisions will be made by the project
proponent for the infrastructure development programme in the project area as per
the needs of the local population. Thus, the proposed Local Area Development
strategy should be formulated by keeping in view the existing facilities and giving due
consideration to the views of the local people.
15.2. Local Area Development Committee
The entire contribution towards Local Area Development Activities to be maintained
in the shape of Local Area Development Fund (LADF) which will be administered by
a committee called Local Area Development Committee (LADC) comprising of
various stakeholders including Government departments, project developers and
local members from project affected areas.
15.2.1. Aims & Objectives
A special provision of Local Area Development Fund (LADF) under the State Policy
has been made to carry out Local Development Activities to ensure that while the
projects are developed in the State, the local communities in the project area also
benefit in the process by way of enhanced development at project cost. Further
allocation of such resources also needs to be based on pre-determined objective
parameters. The people of the affected area should be aware of the allocations
likely to flow to them so that on the one hand gainful infrastructure and local
development activities can be planned well in advance and on the other hand local
communities develop an interest in expeditious completion of projects.
15.2.2. Institutional Arrangement for Administration of Fund
The fund will be administered by a committee called Local Area Development
Committee (LADC) which will be constituted as under: -
1. Deputy Commissioner Concerned Distt. Chairman
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 199
2. Chairman, Zila Parishad -do- Member
3. Representative of the Project Concerned Project Member
Developers
4. District level officers of PWD, Irrigation, Concerned Area Members
Forest, Rural Dev. Departments
5. Representatives of Block Samiti Concerned Blocks -do-
6. Pradhan(s) of all affected -do- -do-
Panchayat(s)
7. Additional Divisional Magistrate -do- Member
Secretary
15.2.3. Functions and Responsibilities of LADC
The LADC is entrusted with, but not limited to, the following activities in its jurisdiction
and will be subject to directions of State Government from time to time: -
a) Realization of contributions to LADF from project promoters as per norms
b) fixed by the State Government.
c) Overall management, control and administration of LADF including
documentation and maintenance of accounts.
d) Approval of shelves of schemes and finalization of Annual Action Plan in
respect of each HEP, allotment of funds to executing agencies.
e) Monitoring and supervision of implementation of schemes under LADC.
f) Review the progress of all administrative and statutory clearances and
removal of local hurdles, if any, settlement of local issues to facilitate timely
execution of the power projects.
15.2.4. Execution and Monitoring
The schemes sanctioned shall be executed by Gram Panchayat concerned or by
Government Department or by project authorities. LADC may also decide the agency
for the execution of schemes. Govt. departments executing the works will not levy
Departmental Charges if such scheme is mandated to be executed in normal course
and LADF should be treated as one of the source of funding. The funds for
sanctioned schemes would be released to the executing agency in instalments. The
Executing Agency shall furnish accounts along with Utilization Certificate and
Completion Certificate to the LADC which after consolidating the details will submit
the Certificates to Project Developer as well as to Director Energy to Govt. of HP.
The progress of LAD activities shall be monitored regularly by LADC.
15.2.5. Management of Fund and Utilization of Interest Amount
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 200
The interest earned on the funds deposited in LADF will become Part of LADF. The
interest earned may be used by LADC to cover cost for organizing LADC meetings,
monitoring, office expenses, audit, hiring experts/technical staff to check LADF works
or hire services of experts for quality assurance, dispute resolution etc. without any
obligation on the State Government. The assets created under LADF shall belong to
the institutions for which they are constructed or to Panchayat as the case may be.
The funds of LADF would be kept in a joint account in Post Office or nationalized
bank. The deposits will be managed efficiently to secure best interest income. The
account of LADC shall be operated jointly by the hairman and Member Secretary of
the concerned LADC. The LADF would be subject to Audit and instructions of State
Government as issued from time to time.
15.3. Preparation of Shelf of Schemes
The Member Secretary, LADC will inform the concerned Panchayat about the
tentative amount that will be available for each project affected Panchayats.
A comprehensive shelf of projects for the entire amount would then be prepared by
Panchayat and approved by the Gram Sabha along with a yearly plan. The annual
plan may be again discussed in Gram Sabha/Gram Panchayat every year and
altered if required. The shelf as approved by Gram Sabha would then be sent to the
Member Secretary of concerned LADC.
While preparing the shelf of schemes preference may be given in the following order
a. Income generating activities/assets - First Priority
b. Renovation/special repairs/maintenance of existing infrastructure – Second
Priority.
c. New Infrastructural Schemes – Third Priority.
Note: Purchase of vehicle shall not be included in any schemes.
The shelves given by the various Project Affected Panchayats would be placed
before the LADC in its full meeting. The LADC will discuss and approve the
schemes. LADC, however, shall not change the Gram Sabha Priorities. The shelves
of schemes for beyond Panchayat level category shall be prepared by Block
Samities or Zila Parishad in consultation with Project Developers and the same shall
be approved by LADC. The LADC shall be the final authority to determine the
Category of a scheme and allocation of funds. While preparing the shelf, the
Panchayat will follow the following:
Priorities: -
a. New Infrastructural Schemes: - Drinking water/irrigation/school buildings/health
centres/pucca roads/pucca paths, markets, bus stand, solid waste disposal,
sanitation, Community Centers, MM Bhawan, Panchayat Bhawan, sanitation
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 201
waste disposal, Creation of income generating assets for Panchayat, Creation of
community places of worship, cremation/burial – First Priority.
b. Renovation/special repairs/maintenance of existing infrastructure i.e. buildings
like school/health sub centres/community halls/roads/paths/water supply and
irrigation schemes/places of worship, shops/other income generating assets of
Panchayats, Panchayat Bhawan, MM Bhawan – Second Priority.
Soil – conservation / watershed / landscaping / parks / playgrounds / kacha-paths /
flood protection works and retaining walls – 3rd Priority.
Following activities are proposed under the local area development plan, however
exact schemes will be formulated by LADC.
A. HUMAN RESOURCE DEVELOPMENT:
a) Training Courses:
The willing and eligible youth from project affected families shall be imparted
education and training through technical institutes conducting Diploma courses and
ITI certificates with a view to absorb them in the project construction and operation.
b) Tailoring, Knitting& Embroidery Training Centers:
To create sustainable and long term job opportunities & generate income levels
among the project affected and other local families; tailoring, knitting and embroidery
centers shall be opened in consultation with the local panchayats. Necessary
equipment/kit, sewing machines along with raw material and instructors shall be
made available at subsidized rate. Arrangements shall be made through government
agencies to sell the products to J&K Handloom Department and other private/ state
agencies involved in the trade.
c) Computer Courses:
Computer training center at Gulabgarh or any other appropriate place in consultation
with local panchayats shall be opened to train eligible candidates from either sex to
help them to avail job opportunities within and outside the project. Infrastructure and
equipment for training courses along with instructor shall be provided.
d) Income Generating Activities/Projects
Capacity building programmes would be implemented for the development of skills in
dairy farming, horticulture and host of other income generating activities.
e) Vocational Training
Creating institutions to impart vocational training for acquiring and upgrading
technical skills with a view to enhance employability. Establishing partnerships with
District Administration and various Non-Governmental Organizations to assist gainful
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 202
self-employment schemes for the unemployed youth in the area, such programs
would include:
Organization of training programs in driving of 4 Wheelers,
Welding and fabrication,
Repair of TVs, Radio and other electronic gadgets.
B. INFRASTRUCTURE DEVELOPMENT AND PUBLIC UTILITIES
a) Community Centers:
To facilitate project affected people to organize marriages/ other social functions
community centers at places selected by the locals shall be constructed & provided
with required furniture, tent house facilities and watchman.
b) Hospital Facilities:
The project Hospital facilities shall be extended to the project affected persons free
of cost. Ambulance and provision of life support system shall be made to meet
emergencies.
c) Sports and other activities:
The project proponent will endeavor to promote sports activities in affected
Panchayats. For promotion of sports, the corporation will go by the collective
decision of all power producers in Chamoli district. Facilities for different games shall
be provided to inculcate interest for sports amongst the youths.
d) Setting up of Recreation Facilities
There is a need to set up recreation facilities like development of gym, parks, etc.
near the project area.
e) Assistance to Schools:
The Schools in the project affected villages shall be provided with computers,
furniture, library etc. to develop these Institutions as model Institutions.
f) Development of concrete paths from Village to Road heads &drainage system:
The affected villages shall be connected with the roads through concrete paths,
wherever required. Effective drainage system shall be developed in the villages.
g) Community Toilets:
Community toilets shall be constructed in the project affected villages in association
with panchayats and proper maintenance shall be ensured.
h) Enhancing Medicare in Govt. hospital:
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 203
The Govt. Medicare system at PHC Atholi shall be improved by providing the latest
equipments in consultation with hospital authorities.
i) Development of Graveyard/Cremation Center
On the request of PAF development of cremation center shall be carried out at
suitable location in consultation with the gram Panchayat / district authority.
C. SOCIAL SERVICES
a) Widow Grant:
One-time financial grant of Rs. 10000.00 shall be given to the widows, under BPL
category in the project affected villages, in the presence of Panchayat Sarpanches
and Panches.
b) Assistance to Physically Handicap:
One-time financial assistance of Rs. 10000.00 in cash shall be provided to the
physically handicapped in the project affected Villages in presence of Panchayat
Sarpanches and Panches.
c) Assistance for female marriages:
An amount of Rs. 10000.00 shall be provided to the project affected family under
BPL category, for the marriage of female in the family.
d) Medical Camps:
Medical Camps shall be organized every three months in the project affected
Villages and free medicines shall be provided to the patients.
e) Assistance to Critically ill:
As a goodwill gesture assistance of Rs. 10,000.00 shall be made available to the
critically ill persons in the project affected Villages.
15.4. Cost Under Human Resource and Local Area Development Plan
A fund under the name, LADF, will be created for development of infrastructure in the
project area. The project authorities will contribute a total of 0.5% of the direct and
indirect charges of project cost (Rs. 226998.74 lac) towards this fund i.e. Rs.
1135.00 lac towards creation of local area development fund to undertake works
under corporate social responsibility.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 204
16. ENVIRONMENTAL SAFEGUARDS DURING CONSTRUCTION ACTIVITIES INCLUDING ROAD CONSTRUCTION
16.1. Introduction
The state is endowed with bounty of natural environmental assets such as forests,
wildlife, clean air, fertile land, mineral reserves and human resource etc. The
construction of hydro power project entails a wanton use of natural resources and
cause their degradation and depletion. Due to large – scale anthropogenic
intervention in construction projects, the pollution gets accumulated in the eco-
system and deplete the environmental stock. Therefore, it is imperative that the
project proponent need to manage the flow of environmental services and minimize
the depreciation of the environmental attributes to remain sustainable in the long run.
This can be accomplished efficiently if the identified adverse impacts are mitigated
pari-passu with the construction stage. On this count, it is legitimate to follow the
environmental safeguards during construction.
16.2. Construction Related Impacts and consequent safeguards
Management of construction-related impacts would be the responsibility of the
project proponent (through its contractors, as and where relevant, and as described
in the EMP). The plans for managing the construction site impacts include plans and
guidelines for managing and restoring the muck disposal sites (including advance
protection measures for the sites, before muck is disposed in these sites),
management and reinstatements for the quarries, management of effluent discharge,
management of safety and health issues, and a chance find procedure for
conservation of cultural properties. These measures are described in detail in the
EMP, and in the supporting environmental documents. Supervision and monitoring
will be essential to ensure full implementation of the detailed plans. These
arrangements have been described as part of the EMP.
16.2.1. Safeguard from Pollution from Labour Camps during Construction Phase:
The aggregation of large labour population and technical staff during construction
phase is likely to put significant stress because of discharge of sewage, solid wastes
and other pollutants. The total population due to congregation of work force and their
families during construction phase is expected to increase the local population
significantly. This is likely to affect the existing infrastructure. Thus, the EMP has
identified several measures to be implemented to maintain the facilities in labour
camps, sanitation and sewage treatment facilities, solid waste management, and
provision of community kitchen.
16.2.2. Safeguard from Land Degradation and Pollution from Road Construction:
In hilly terrain, road construction often generates significant quantity of wastes
(muck) due to the stripping of the rocks to make way for the roads. The stripped
muck is generally cleared by dumping the material along the slopes. These dumped
materials finally flow down to the valleys and ultimately finds its way in to the river.
The EMP includes measures so that the stripped material would be collected and
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 205
dumped in the designated muck disposal areas, protection against erosion, and bio-
engineering measures to protect the road slopes
16.2.3. Safeguard related to Muck Disposal:
For managing huge quantity of muck to be generated by the project, a muck disposal
plan has been prepared. The plan includes, over and above reuse of part of the
muck as construction material for the project, site protection and rehabilitation
measures which includes civil works, vegetative measures, fencing and planting. As
dumping areas are located closed to river Chenab, there are chances of rolling down
of muck/ loose material leading to blockage in river flow or contamination of water
due to silting. To avoid this, retaining walls of adequate height are to be developed at
30m from the point of intersection of HFL with the river bank.
16.2.4. Safeguard and control of air pollution, noise pollution and water pollution.
Due to excavation as well as stone crushing activities, there shall be increase in the
ground level concentration of the Ambient Air Quality particularly PM10. There will be
temporary increase in the noise levels at the project site. But the noise level will be
largely attenuated due to presence of thick canopy of vegetal cover of the forests.
Besides this the human settlement is far away from the project site. All crushers will
have cyclone, and particulate filters. Workers would be provided with effective
personal protective gears such as masks, ear muffs or ear plugs. Equipment and
machinery should be maintained regularly to keep the noise generation at the design
level. Silencers and mufflers of the individual machinery are to be regularly checked.
The sewage generated from various labour camps shall be treated in septic tanks
before disposal by discharging into the river. The septic tanks shall be located so as
not to pollute the drinking water sources. During tunneling work, the ground water
flows into the tunnel along with construction water, which is used for various works
like drilling, shortcreting, etc. Settling tanks of adequate size to settle the suspended
impurities will be constructed. The sludge from the various settling tanks can be
collected once in 15 days and disposed at the site designed for disposal of municipal
solid wastes from the labour camps. During construction stage periodical
environmental monitoring of ambient air quality and noise and water quality from
different sources has been planned and incorporated in the relevant management
plan.
16.2.5. Impacts on Physical Cultural Resources
The project area does not have known archaeological or historical sites or remains.
This has been confirmed by a field based archaeological examination of the project
area.
16.2.6. Safeguard for involuntary land acquisition
For construction of project private land shall have to be acquired. The land
requirement for various components of the project i.e. diversion structure, intake
structure and underground works have been in sync with the dimensions determined
on the basis of detailed hydraulic as well as structural design. Some quantity of the
muck generated has been proposed for consumptive use for construction material
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 206
thereby implying minimization of land required for muck disposal site as well as
quarry sites. Thus, to keep the land requirement to the minimum, an all-out effort has
been made. On the basis of the primary and secondary data collected in respect of
the project affected families a draft R & R Plan has been formulated in consonance
with the principles enunciated in “The Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013”, which has come into
force from 1-1-2014, notified by Government of India.
16.2.7. Impacts Due to Loss of Forests
Due to diversion of forest land for the project purpose there will be loss to the
existing flora coming within the submergence area as well as other project
components. As a safeguard measure, compensatory afforestation has been
formulated as per the statutory requirement.
16.3. Road Construction
The project construction would entail significant vehicular movement for
transportation of construction machinery, construction material, Muck Disposal.
Some of the existing roads in the project area would require widening. To execute
the various civil works, roads would be made for linking the work site to other sites
and to job facility areas. Most of the access roads connecting to the project
components shall be black topped while the temporary roads for the river quarry
shall be WBM roads. As per DPR, the length of the road to the dam site and other
project areas including widening of road shall be 15km while the length of roads to
quarry and muck site shall be 5km.
16.4. Impacts Due to Construction of Roads
The construction of roads can lead to the following impacts:
The topography of the project area has steep to precipitous slope, which
descends rapidly into valleys. The conditions can give rise to erosion hazards
due to net downhill movement of soil aggregates.
Construction of new roads increases the accessibility of a hitherto undisturbed
areas resulting in greater human interferences and subsequent adverse impacts
on the ecosystem.
Increased air pollution during construction phase.
16.5. Management Measures
The approach roads will have to be constructed as a part of the access to the
construction site. Road construction may result in loosening of soil/rock at places and
give rise to landslides particularly due to seepage water.
Landslides on steeply sloping bank can largely be controlled by provision of suitable
drainage. The basic principle is to intercept and divert as much water as possible,
before it arrives at a point, where it becomes a nuisance. The other erosion hazard is
that of surface erosion of the bank, which is best controlled by vegetation. For such
terrain of the project area which does not support vegetation, engineering solutions
such as surface drainage, sub-surface drainage, toe protection and rock bolting can
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 207
be used. The overall budget for construction of roads and bridges has been
earmarked under sub-head “R-Communications” in the DPR.
Road construction will generate muck due to the stripping / blasting of the rocks. The
stripped material would be collected (to the maximum extent) and dumped in the
designated muck disposal area, which will have retaining wall to prevent the muck to
flow down into the river. After disposal operation is complete at the dumpsite, the
dump yard shall be stabilized by terracing and overlain with geo-textile and seeded
with suitable grass species.
The various aspects to be considered while making the project roads are briefly
described in the following paragraphs.
16.5.1. Construction
The clearing area shall be properly demarcated. Where erosion is likely to be a
problem, operations shall be so scheduled and performed that grading
operations and permanent erosion control of features can follow immediately
thereafter, if the project conditions permit; otherwise temporary erosion control
measures shall be provided between successive construction stages.
The method of balanced cut and fill formation shall be adopted to avoid large
difference in cut and fill quantities.
The cut slopes shall be suitably protected by breast walls, provision of flat stable
slopes, construction of catch water and intercepting drains, treatment of slopes and
unstable areas above and underneath the road, etc.
Excavated material shall not be thrown haphazardly but dumped at designated
dumping sites which shall be stabilized by terracing and overlain with geo-textile and
seeded with suitable grass species.
The access roads leading to power house, surge shaft, intake and dam shall be
black topped while the roads in the river quarry site and muck disposal sites shall be
katcha roads.
16.5.2. Drainage
All artificial drains shall be linked with the existing natural drainage system.
Surface drains shall have gentle slopes. Where falls in levels are to be
negotiated, check dams with silting basins shall be constructed and that soil is
not eroded and carried away by high velocity flows.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 208
Location and alignment of culverts shall also be so chosen as to avoid severe
erosion at outlets and siltation at inlets.
16.5.3. Grassing and Planting
Tree felling for road construction/works shall be avoided wherever possible.
However, compensatory afforestation shall be carried out for forest land used for
the purpose.
Afforestation with suitable species will be attempted and sustained along the
roadside to a sufficient distance on either side of the road.
16.5.4. Other measures
Water will be sprayed regularly during construction phase of the roads to prevent
entrainment of dust.
Regular compaction of temporary roads shall also be carried out
16.6. Budget
An amount of Rs 40.00 lac has been earmarked for implementation of measures to
mitigate adverse impacts due to construction of roads. The details are given in Table
16.1.
Table 16.1 Details of expenditure for implementation of measures for management of
Impacts due to construction of roads
S. No. Item Cost
(Rs lac)
1. Vacuum Clearing and grubbing @ Rs.0.20 lac /km/year for 5
km
5.00
2. Provision of water for spray @ Rs. 500/tanker for 2 tankers
per day for a construction period of 240 days/year for 5.0
years
12.00
3. Providing Revetments and Breast walls 23.00
Total 40.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 209
17. ENERGY CONSERVATION MEASURES
17.1. Introduction
The execution of Kirthai HEP, Stage-I and appurtenant works there under have been
proposed to be carried out contractually to be completed in 84 months’ time.
Infrastructure facilities shall be developed pari passu with the construction activities.
With the commencement of construction activities the deployment of labour force
comprising of skilled/semi-skilled/unskilled will take place and at a given point of time
2100 workforce shall be engaged. It is expected that 50% of the total work force
shall be locally available and manpower to the tune of 1050 persons shall be
imported from other parts of the country. The temporary labour camps will be
established at suitable location in the project area. The fuel need of the labourers/
workers has to be attended in an organized manner otherwise the labour may resort
to indiscriminate felling of trees and shrubs owing to their cost free and easy
availability at leisure. Consequent deforestation if continued shall adversely affect the
ecosystem; therefore, pre-emptive action plan has to be devised to meet the fuel
needs of workers especially those residing in the labour camps. These objects can
be best accomplished by mandatory banning of the use of fuel wood in the labour
camps besides complying with the following obligatory steps:
In every contract document, mandatory clause should be made for the
contractors to provide community kitchen facilities to labourers who reside
without family and also to ensure supply of LPG fuel to the labourers living with
families in camps failing which the contractor shall solely be held responsible and
liable for penalty and or remedial action.
Establishing a LPG go-down and a state-owned kerosene oil depot within the
township of project complex.
Providing free electricity for domestic purpose to the labourers residing in labour
camps.
17.2. Alternate to Fuelwood
The fuel shall be required by the labour for cooking purpose, warming the rooms
during cold months and also for warming water. In natural course, if the workforce is
allowed to manage these at their will, the first choice shall be the free and readily
available natural and conventional resources i.e. fuel wood. Thus pressure due to
immigrating labour using fuel-wood extracted free from the local forest shall increase
in alarming proportion which may lead to complete denudation of forest in nearby
pockets. Therefore, to avoid immediate pressure for fuel-wood in the adjoining forest
and consequential increased production of carbon emission it is proposed to use
LPG for cooking and electricity for heating in the camps and kerosene stoves at site.
17.3. Scheme for Substitute Fuel To Labourers
Under this scheme a practical work plan has been prepared for implementing the
subsidized fuel scheme for the work force of the project. It is proposed to provide
LPG connection for cooking, kerosene and electricity for heating purposes.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 210
17.3.1. Provision for LPG
It is proposed to establish a gas agency within the premises of project Head Quarters
at Pilli village, which will cater to the requirement of gas for cooking purposes of the
employees and workmen/ labourer. Each workman family can refill 1 (one) cylinder
after every 30 or more days depending on actual consumption. About 2100 work
force (skilled/unskilled) would be engaged temporarily during peak construction
period, out of which 50% shall be from bona fide residents of J & K. It is expected
that 50% of the work force belonging to resident Kashmiries shall be locally available
from the adjacent areas and shall manage to work at site by making to and fro
journey from their home. Thus, out of balance 1050 numbers, about 175 workmen
shall reside in colonies with their families and rest 875 in bachelor accommodations
like dormitories/ field camps. The requirement of gas cylinder per month has been
worked out on the basis of one cylinder per month for workmen living in family
accommodations and one cylinder for a group of 3 workers living in dormitories/
labour camps. The total requirement of LPG cylinders for stipulated 5 year project
period @ 467 cylinder / month works to 28020 numbers.
17.3.2. Provision for Kerosene
Kerosene is an easily available fuel having less operational hazards. With the help of
the state Government, a kerosene depot shall be opened for the distribution of
kerosene oil to labourers. The requirement of Kerosene has been worked out @ 0.25
l/family/day as 43.8 liters /day for 175 labour family, who shall reside in family
accommodation and@ 0.15 l/labour/day as 131.5 liters/day for 875 labours, who
shall reside in bachelor accommodation. Thus the total requirement shall be to the
tune of 5250 liters / month or 315000 liters for the entire project execution period.
17.3.3. Provision for Electricity
Electricity supply should be arranged for lighting purpose to the tune of two 100 W
bulbs per family and provision of street light should be made in the labour colony at
the contractors cost. However, use of CFL should be encouraged from the
consideration of saving of power and economy. The electricity for heating purposes
shall be provided at one (01) unit/day for each of 875 workers residing in bachelor’s
accommodation and two (02) unit/day for each of 175 workers residing in family
accommodations. Thus, the total consumption per day on this count shall be 1225
units and the overall consumption during 60 month shall be 2205000 units.
17.3.4. Energy Conservation Devices
With a view to conserve electrical energy, wherever possible, it is proposed to resort
to solar lighting system for street lighting / park lighting etc. Besides this the workers
shall be discouraged for using conventional electric bulb/florescent tube lights which
consume more wattage. For this the workers shall be encouraged to use energy
saving lighting devices like CFL/LED Bulbs which shall be provided at subsidized
rates to the workers.
17.4. Debitable Cost of Providing Fuelwood Substitute
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 211
The difference in cost of using fuel wood and other suggested substitutes which the
contractors shall be loading in their tendered rates and which finally shall be debited
to the cost of project has been assessed to the tune of Rs. 340 lac as is shown in
Table 17.1.
Table 17.1 : Cost of providing fuel wood substitute
S.
No
Item Unit Estimated Consumption Rate
(Rs.)
Cost
(Rs. in
lac)
Per
day
Per
month
Project
period
A Conventional Fuel
wood @ 1.5
kg/person/day
Quintal 21 630 37800 500 189.00
B Alternate fuel
1 LPG Cylinder 15.6 467 28020 1300 364.30
2 Kerosene stoves. Liter 175 5250 315000 15 47.25
3 Electricity (heating)
Unit 1225 36750 2205000 5 110.25
Sub Total (B) 521.80
C Difference between
conventional and
alternate cost
- - - - - 323.50
D Providing CFL/LED
Bulbs at 80%
subsidy to workers
- - - - - 7.50
E Providing Solar
Street Lighting
(SL7- 15 Watts
Solar Street Light)
in snow bound
areas
Nos. - - 50 30000 15.00
Total 346.00
It is thus eloquent from the table that the additional cost due to application of
alternate fuel to fuel wood due to environmental constraint shall be attributed to the
environment management of the project under provision for substituted fuel. The cost
is inconsequential when compared to the loss of 3500 trees which would have been
cut for meeting the fuel wood requirement. The assessment is based on very
conservative approach by adopting conversion factor of 3.6 Qtl/cum and the cubical
content of a tree as 3 cum. per tree. This implies that on the assumed average stock
density of 200 trees per ha, in all 17.5 ha forest area would have to be sacrificed for
this purpose.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 212
18. ENVIRONMENTAL MONITORING PLAN
18.1. The Need
Sustainability of water resource project depends on continuous monitoring.
Monitoring is an integral part of any environmental assessment process. Water
resource development project creates a new environment with complex inter-
relationships between people and natural resources. The magnitude of changes
being created due to alteration of landscape, water, air and noise quality and other
environmental parameters can be quantified and evaluated only by carrying out
monitoring of various parameters during different phases of project construction and
operation.
The monitoring and evaluation of environmental parameters indicates potential
changes occurring in the environment which paves way for implementation of
rectifying measures wherever required to maintain the status of the natural
environment. Evaluation is also a very effective tool to judge the effectiveness or
deficiency of the measures adopted and provides insight for future corrections.
18.2. Areas of Concern
In case of hydro power projects, the changes relating to water, aquatic biota, air,
noise, biodiversity of the area and compensatory afforestation programmes need
special attention from monitoring point of view during project construction as well
post construction stages to judge the efficacy of measures implemented for
conservation of environment.
18.3. Environmental Monitoring
The overall impact assessment of the proposed project was carried out and
monitoring plans have been framed based on the severity of impacts in different
areas. During the EIA study, it has been observed that the air quality and water
quality are not going to be affected significantly and only, temporary changes in
these parameters are expected. The preventive/ curative measures to reduce the ill
effects of construction activities on these parameters have been suggested under
various plans. A holistic approach has been adapted for monitoring of air, noise and
water related factors under different heads with suitable financial provisions for their
implementation.
18.3.1. Air Quality Monitoring and Management
Pollutant which may be generated during the construction phase of the project will
alter the local environment temporally and shall subside once the major
constructional activities are over. During the construction phase of the project, the
ground level concentration of the pollutant like SO2, NOx and PM10 are likely to
increase but shall be within the threshold limit especially in surface excavation areas
but may exceed the threshold limit for underground work areas which is to be
controlled by use of ventilator fans. It should be made mandatory on the part of the
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 213
contractors that they use the required equipment for monitoring gaseous pollutants in
and around the project and submit a detailed report every fortnight to the project
authorities for evaluation and monitoring purposes. The air quality in and around the
project area can be improved by the application of following practices/ methods.
Excavation work may be carried out by pre-splitting and controlled blasting techniques
Control blasting be carried out as far as possible and use of explosive also be bare minimum.
The type of explosive used in blasting may be selected as per the requirement.
To settle down the dust in project area especially around crushing plants, excessive use of water sprinklers is the best method.
The work of Air Quality Monitoring may be assigned to either J & K Pollution Control
Board or any other agency approved by MOEF. For this a lump-sum provision of Rs.
9.00 Lac & 3.60 Lac for 5 & 2 years during construction and operation phases
respectively shall be sufficient to cater to the quarterly monitoring of air quality
parameters such as SO2, NOx, CO and PM10. The monitoring site should be
Dam site
Near Quarry Site-II
Muck dumping area d/s of dam
Muck dumping area of MAT & TRT in between Lidrer and Shirir Nala.
The total financial implication of this plan stands as Rs 12.60 Lac.
18.3.2. Noise Quality Monitoring and Management
The level of noise will definitely rise above threshold level in the project area due to
different types of construction activities: blasting for tunnels, powerhouse, dam etc,
movement of heavy and small vehicles and the crushing plants. All these activities
will generate high noise and vibrations which can cause health hazards among the
labours, local inhabitants and wildlife present in the area. Therefore, it would be most
appropriate if following measures are rigorously applied during construction phase of
the project.
Continuous monitoring of sound level within the project area.
Extensive plantation to be carried out in the project area as plants absorb
sound and make a barrier for its travel to long distances.
Pre-split and controlled blasting.
Provision of Air muffs to workers working in underground excavation works.
Compulsory Periodic Maintenance of high earth movers, batching and
crushing plants.
Monitoring and measuring the sound level can be again assigned to either J & K
Pollution Control Board or any other external agency. The financial implication for
monitoring of noise pollution is proposed for every three months during construction
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 214
phase of five years and post construction phase for two years. The total financial
implication for construction and post-construction phase works out to Rs. 4.00 lac.
The noise shall be monitored at the following locations:-
o Near dam site o Quarry Site-II o Near village Kadail o Power House Site
18.3.3. Water Quality Monitoring and Management
Water is one of most precious natural resources. Human beings are highly
dependent on water for various purposes such as domestic needs, sanitation
irrigation, industry, and disposal of wastes etc. The catchment of the Chenab and its
tributaries upto the power house site does not host any industry. Thus, the stream
water is almost free from major industrial chemical pollutants. Besides this, the
catchment is sparsely populated with small chunks of agricultural fields. Therefore,
the water of river bears some load of silt mainly from glacier melt i.e. moraine deposit
and domestic wastes. Further, due to congregation of labourers during the
construction phase, the water quality in this stretch may get deteriorated if proper
sanitation facilities are not provided to them. The probable water pollutants which
may cause pollution during the construction phase of this project are:
Suspended solids Biodegradable organic matters Pathogens and vectors Nutrients Dissolved inorganic solids
The Government of India has prescribed clear cut guidelines for the maintenance of
water quality standards which are given in Table 18.1.
Table 18.1 : National River Water Quality Standards for Different Uses*
Sl.
No.
Characteristics Tolerance Limit
Drinking
water
source
with
conventi
onal
treatmen
t
Outdoo
r
bathing
Drinking
water
source
with
convention
al
treatment
but after
disinfectio
n
Fish
culture
and
wildlife
propagat
ion
Irrigatio
n
industri
al
cooling
or
controll
ed
water
disposal
A B C D E
1. pH value 6.5-8.5 6.5-8.5 6.5-8.5 6.5-8.5 6.5-8.5
2. Dissolved Oxygen (mg/l),
min
6 5 4 4 -
3. BOD (5-days at 200 C, 2 3 3 - -
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 215
mg/l, min
4. Total Coliform Organism,
MPN/100, max
50 500 5000 - -
5. Colour, Hazen units, max 10 300 300 - -
6. Odour 10 300 300 - -
7. Taste Tasteless - - - -
8. Total Dissolved Solids,
mg/l, max
500 - 1500 - 2100
9. Total Hardness (as
CaCO3),mg/l, max.
300 - - - -
10. Calcium Hardness (as
CaCO3), mg/l, max
200 - - - -
11. Magnesium Hardness (as
CaCO3), mg/l, max
100 - - - -
12. Copper (as Cu), mg/l,
max
1.5 - 1.5 - -
13. Iron (as Fe), mg/l, max 0.3 - 0.5 - -
14. Manganese (as Mn),
mg/l, max
0.5 - - -
15. Chloride (as Cl), mg/l,
max
250 - 600 - 600
16. Sulphates (as SO4), mg/l,
max
400 - 400 - 1000
17. Nitrates (as NO3), mg/l,
max
20 - 50 - -
18. Fluorides (as F), mg/l,
max
1.5 1.5 1.5 - -
19. Phenolic Compounds (as
C6H5OH), mg/l, max
0.002 0.005 0.005 - -
20. Mercury (as Hg), mg/l,
max
0.001 - - - -
21. Cadmium (as CD), mg/l,
max
0.01 - 0.01 - -
22. Selenium (as Se), mg/l,
max
0.01 - 0.05 - -
23. Arsenic (as As), mg/l,
max
0.05 0.2 0.2 - -
24. Cyanide (as CN), mg/l,
max
0.05 0.05 0.05 - -
25. Lead (as Pb), mg/l, max 0.1 - 0.1 - -
26. Zinc (as Zn), mg/l, max 15 - 15 - -
27. Chromium (as Cr6+), mg/l,
max
0.05 - 0.05 - -
28. Anionic Detergents (as
MBAS), mg/l, max.
0.2 1 1 - -
29. Polynuclear Aromatic
Hydrocarbons (as PAH)
0.2 - - - -
30. Mineral Oil, mg/l, max 0.01 - 0.1 0.1 -
31. Barium (as Ba), mg/l, 1 - - - -
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 216
max
32. Silver (as Ag), mg/l, max 0.05 - - - -
33. Pesticides Absent - - - -
34. Alpha emitters, uC/ml,
max
10-9 10-9 10-9 - -
35. Beta emitters, uC/ml,
max
10-8 10-8 10-8 10-8 10-8
36. Free Ammonia (as N),
mg/l, max
- - - 1.2
37. Electrical Conductance at
250C, mhos, max
- - - 1000 x 10-6 2250 x 10-
6
38. Free Carbon dioxide (as
CO), mg/l, max
- - - 61
39. Sodium absorption ratio - - - - 26
40. Boron (as B), mg/l, max - - - - -
41. Percent sodium, max - - - - -
* IS: 2296-1982
The water quality in and around the project area may, therefore, be monitored
regularly, and certain necessary corrective measures be introduced accordingly to
maintain it. The project proponent shall also ensure Environmental flow of water
immediately below the barrage at all times including lean seasons.
Proposed Water Quality Monitoring Plan
It is anticipated that during the construction period of the project the generation of
waste water from construction sites, residential colonies and labour camps may
increase and facilitate transport of sediment laden waters to the river. Pollutants
resulting from the sewage waste would definitely degrade river water quality further.
The following measures are, therefore, proposed for water quality management:
Sufficient water should be supplied to the labour camps and residential colonies
Water should be treated before use to prevent pathogenic and coli form organisms
Sewage waste be released in river only after proper treatment
It is proposed that the sediment laden water from different project components may
be collected in sedimentation tanks/water tanks to dislodge the sediments before
releasing the sediment free water to river/streams.
Adequate solid waste management practices be adopted in colonies and labour
camps as suggested in solid waste management plan. It would be eco-friendly if
sewage water after disposal of solid waste may be used in watering of parks and
gardens. In addition to this, periodical monitoring of water for its physico-chemical
and bacteriological parameters may be conducted quarterly at under mentioned
sites.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 217
Rive Chenab dam site River Chenab near aggregate crushing and batching plant Honsar Nala Rive Chenab d/s of project colony
The financial provision of Rs 12.00 lac and 4.80 Lac is made for the period of five
years from the date of project execution and for 2-year post-construction
respectively. The water quality parameters to be monitored quarterly are shown in
Table 18.2.
Table 18.2 : Water Quality parameters to be monitored periodically
pH DO Phosphates
Electrical Conductivity BOD Nitrates
Turbidity COD Sulphates
Water Temperature Free CO2 Fluorides
TDS Alkalinity Iron
Total hardness Chlorides Manganese
Magnesium Total Coliform
Calcium E-Coli
Monitoring of Incidences of Water-Related Diseases
Identification of water related diseases, adequacy of local vector control and curative
measures, status of public health are some of the parameters which need close
monitoring. The monitoring of water related vectors may be executed in collaboration
with State Health Department and data so generated may also be preserved by them
for future reference. For monitoring twice a year for 5 years during construction and
two years post-construction a provision of Rs. 6.50 lac and Rs 2.50 has been made.
18.4. Equipment Required for Monitoring
The project proponent shall create an environmental monitoring cell under qualified
environmental manager to be assisted by environmental engineer and supervisor.
Besides this, the project proponent shall also establish a proper laboratory. Field and
laboratory instruments required for taking grab samples of water and soil including
their analysis in the laboratory and monitoring of air and noise required have been
presented in Table 18.3. The cost of equipment shall be met from the provision
under subhead ‘Q-Equipment’.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 218
Table 18.3 : List of Equipments
Sl. No. Name of Equipment and Model No.
1. Aquarium
2. Arsenic Assemblies
3. Atomic Absorption Spectrophotometer
4. Autoclave
5. Automatic Gas Analyzer Multi-log 2000 (Data Logger)
6. Bacteriological Incubator
7. BOD Incubator,6
8. Centrifuge (700-3500 rpm)
9. COD Digestion Assembly flask with fume duct
10. COD Digester
11. Conductivity Meter
12. Digital spectrophotometer, GS-5700B, 113-546
13. Electronic weighing scale, AG-285 (120150210)
14. Electronic weighing scale, RI- Model-0 to 14 pH
15. Flame Photometer, CL-220
16. Gas Chromatography
17. Glass Water Distillation Kit
18. Hot Plate
19. HVS
20. Inoculation Chamber
21. Jar Test Apparatus
22. Kjeldhal Distillation Assembly (Nitrogen)
23. Laminar Flow
24. Magnetic Stirrer and Teflon Stirrer
25. Membrane Filter Holder (47 mm)
26. Mercury Analyzer
27. Meteorological station, WM-251
28. Monocular Microscope
29. Muffle Furnace (9000C)
30. Multigas Analyzer
31. Noise Level Meter (Automatic with Data Logger)
32. NOX Assembly
33. Organic Vapor Sampler (APM 480)
34. Orsat
35. Hot Air Oven
36. pH meter (No. 2), LI-127, 101/353
37. Refrigerator GNF-220X (Non CFC)
38. Respirable Dust Sampler x 2 (Envirotech APM-451/460)
39. Flash Shaker
40. Stack Monitoring Kit
41. Turbidity Meter, R-211, 032/1382
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 219
Sl. No. Name of Equipment and Model No.
42. Vacuum Rotary Evaporator
43. Vacuum Pump
44. Velocity Kit
45. Water Bath
18.5. Monitoring of Erosion & Siltation
During the construction period, the project proponent shall monitor daily the
suspended silt load of the Chenab at dam site. Besides this, the stability of river
banks shall be closely monitored. After Completion of the project, the project
proponent shall monitor the daily suspended silt load of the Chenab and work out
yearly silt load in Ha.m/year/100 sq km of the catchment area and keep a record of it.
On these counts a financial provision of Rs 5.0 lac for monitoring during construction
alone is being made as the post construction daily monitoring of silt load is the
requirement for running the machines and the responsibility anyway rests with the
project proponent.
18.6. Environment Monitoring Through Remote Sensing Technology
The use of remote sensing technology can be aptly made for monitoring of the
progress of the works proposed under catchment area treatment, compensatory
afforestation, and green belt. This can be achieved by the periodically study of digital
satellite data IRS P6 LISS-III for the specific site and evaluated on ERDAS imagine
software. The standard False Colour Composite (FCC) generated by assigning blue,
green and red colours to visible green, visible red and near infrared bands
respectively. Expressing image pixel addresses in terms of a map coordinate base is
often referred to as geo-coding. As various thematic layers are to be overlaid for this
project, all the layers shall be geo-referenced to real world coordinates. The
comparative study of change in land use pattern, the change in extent of forest
areas, the growth of new plantation, the development of new land slide zones can be
established by periodical study of the scene obtained from the satellite. The
technique can also be made use of in establishing the expanse of sedimentation in
the reservoir by comparing the scene obtained from remote sensing after every three
years or so.
18.7. Ecosystem Studies
Efficacy of conservation measures implemented in catchment area treatment plan
such as afforestation and soil conservation measures, and their effects on flora,
terrestrial fauna, aquatic fauna (fish migration) are the aspects which should be
evaluated and monitored under the head monitoring of ecosystem. The findings of
this study should be made available to authority implementing CAT plan, restoration
of muck disposal and quarry areas, reservoir rim treatment on periodic basis so as to
make necessary change if need arise and the implementation more meaningful
during construction and operation phase of the project. Since, the study is subject
specific, services of expert agencies will be required to carry out the same.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 220
Therefore, the financial provisions of Rs. 5.0 Lac has been made and provided in the
final cost estimate of environmental monitoring plan. This fund will also take care of
the expenditure for other studies which are required by the regulatory authority from
time to time and also cater to the needs of expenditures to be incurred on public
awareness programmes for environmental conservation.
18.8. Monitoring of Muck Disposal.
It has already been made eloquent in the relevant muck management plan that the
excavated material shall be evacuated from site with suitable usable muck to be
utilized in project works by the project proponents and also allowed to be used by
private users and the non-usable muck is to be disposed of on designated areas so
as not be interfere with either environment/ecology or the river flow regime. Thus
these is an imperative need to monitor regularly the quantum of muck generated and
its disposal for which purpose the project proponent shall furnish monthly statement
of muck/debris disposal to project proponent and J & K Pollution Control Board.
18.9. Monitoring of Socio-Economic Structure
The baseline socio-economic structure of the project affected zone / area and the
project affected villages shall be monitored after the area involved for project
components and the submergence area are demarcated by setting-up of FRL pillars
in the reservoir area and demarcation of land required for different project
components, colonies, muck disposal sites and borrow areas etc. The detailed study
of socio-economic structure of the project affected families can be authentically
carried out after the property survey in the submergence zone conducted by the
project proponent, which should be taken up before a comprehensive EIA study is
undertaken.
During transfer phase of the affected property / assets, the monitoring should be
carried out to assess changes and discrepancies in respect of number of PF and
their aspects as evaluated before the statutory deadline fixed by the government.
Besides this, monitoring of implantation of various community development schemes
/ programmes needs to be carried out every quarter so that the benefits from these
schemes accrue expeditiously. The monitoring needs to be carried out pari-pasu with
the implementation of R & R plans and social development works and also two years
after completion of these plans in order to assess the socio-economic changes
brought about due to establishment of the project.
18.10. Sharing of Monitoring Results
The results of monitoring of various environment attributes either during or post
construction would be shared by the monitoring agency, whosoever including State
Pollution Control Board, with the project proponents and other agencies of the
Government as and when required. Monitoring agency may disseminate the results
in any other forms.
18.11. Capacity Building
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 221
Since the effectiveness of Environmental Assessment & implementation depends
considerably on the understanding and preparedness of their Engineers and in
particular their Environmental Team (Consisting of Environmental Officer, EO &
Forest Officer, FO). It is important that project proponent makes effort to sensitize the
Engineers and Environmental Team on management of environmental issues,
provides guidance, and encourages them to build requisite capacities. Capacity
building can be achieved by two prong strategy.
training programme for existing staff
Technical Assistance: Recruitment of additional staff /knowledge sharing with consultants, having requisite expertise.
18.11.1. Training Programme
Purpose of training
All the issues discussed in the comprehensive EIA/EMP report, will at some stage
require a certain element of training in the process of developing capacity within the
project proponent. A number of the identified issues will be new to the existing
environmental team and their staff members. It is therefore vital that a major
programme of training is developed and implemented by project proponent.
Before commencing any training, there are a number of activities which needs to be
completed. The first step is to ensure that all procedures in the environmental
management system have been properly worked out. As part of this process, there is
a need to closely evaluate the existing organizations both at central and local level in
relation to their suitability and current capacity to take on the new responsibilities.
This exercise needs to clearly identify the performance requirements of the various
officials involved. Duties and responsibilities need to be clearly defined for the
institutions as a whole and individually for each category of staff. It is only on this
basis that the new staff performance requirements can be established, and the
training required for existing and new staff can be determined.
When developing a training programme of this nature, it is important to acknowledge
that this is not a one-time event. It is rather the start of a long-term training service
which not only strengthens capacity, but also contributes to sustain this capacity
within the organization.
Training Strategy
A key concept in training programmes for project proponent / any organization is to
provide training through a combination of formal classroom training and practical on-
the-job sessions. Technical assistance should be made available to provide training,
guidance and advisory support in all aspects of works implementation in order that
the key players (Environmental as well as technical team) become fully conversant
with, and capable of carrying out their respective duties.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 222
Training for the various categories of staff need to be carried out with varying
duration and through different approaches, such as on-site and classroom training,
workshops, seminars and practical on-the-job training.
Concept of Training
Training is always an effective up-front quality assurance measure. Experience
shows that there is a great demand for training in technical subjects for the
government staff in charge of work supervision. Effective training programmes
involve both the introduction of new technology as well as in-depth studies of the
particular skills required in each position in the works organization. As the training
content for these reasons relate to practical hands-on skills, the training often
consists of dissemination of best practices and work methods which have been
proved most effective in projects with similar tasks and working conditions (i.e.
neighboring provinces, pilot projects, etc.).
Training Methods
The most effective way of addressing such training needs is by carrying out the
training in an environment which to the extent possible resembles the real situation in
which the trainees will eventually operate.
Classroom Sessions although training needs to focus on practical skills, which are
the best, taught in the field, there is always a demand for a certain theoretical
foundation on which the practical skills are placed. For example, experience shows
that it is useful to review basic methodology and regulations, which in turn is
explained in the context of environmental management system in railway works. Also
for technical subjects such as impact categorization, selection of mitigation
measures, EMP as part of bidding document and others, there is a demand for an
introduction to the subjects in a class-room environment, during which (i) the theory
is reviewed, and (ii) a general briefing of the field exercises is conducted, before the
field sessions commence.
After the initial classroom training and skills development sessions, further practical
training should be carried out in a full-scale demonstration situation. This includes
establishing training/demonstration sites fully equipped with the same type of tools
and equipment that contractors will be using.
On-the-job Training It has been proved that on-the-job training is the most effective
method of training most categories of government staff. This involves the extensive
use of practical demonstrations and skill training at full-scale training sites. This
approach is very effective for the training of managers, engineers and supervisors
with the on-site training being supported by classroom components tailored for the
various categories of staff.
Short Courses and Workshops Intensive refresher courses for periods of one to
three days are useful for addressing specific problem areas. Such courses or
workshops are organized to supplement on-the-job training for some of the technical
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 223
and administrative staff. Short courses can either be arranged through the provision
of technical assistance, an in-house training facility, or by contracting other training
institutions within the country.
Seminars- Seminars are useful as a means for disseminating data and information,
in particular for senior government officials at central and local level, as well as
representatives of other government agencies. Seminars can be an effective
platform for policy makers, planners and administrators to review the importance of a
Environmental Management System. Equally important, this type of seminar is
important in terms of creating awareness of the potential of utilizing new
organizational arrangements, work methods, and involvement of the private sector,
beyond the boundaries of a particular programme.
Training Module Details
A comprehensive training programme should be planned for the project by the
Project Implementation Unit (PIU) intended to address all components of the project.
Developing a comprehensive idea about the Environmental requirements, project
proponent /PIU will fix the role/responsibility to effectively manage the environment
components involved. In general, the training programme is proposed by planning
consultant, during the design stage of project.
The programme should be intended for all Contractors, Construction Supervision
Consultants (if any). As and when found necessary PIU in consultation with EMU will
select appropriate modules for the training of contractors and for the training of
engineers responsible for supervision and maintenance work. List of appropriate
training modules and their time frames is discussed in subsequent paragraphs
The training components may be broadly divided into the following categories:
Principles and policies for (natural and social) environmental mitigation in
development projects;
Legal and institutional aspects; project mandates;
Probable (natural and social) environmental impacts and losses in establishing
hydro-electric projects;
The EMP in project proponent consisting of
i) The construction stage environmental concerns;
ii) The environmental designs and implementation plans;
iii) The project entitlement framework;
iv) Types and aspects of vulnerability of the EPs;
v) Counseling and grievance redressal methods and mechanisms and
vi) Financial control mechanisms;
Monitoring, evaluation and reporting methods and mechanisms and,
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 224
Inter-sectoral and inter-agency collaboration, etc.
The institutional strengthening and the training programme with training components
have been provided in Table 18.4. The schedule of training and strengthening
programme is shown in Table 18.5. The cost of training and strengthening
programmes shall be made through the provision made under sub-head “A-
Preliminary” of the cost estimate under DPR.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 225
Table 18.4 : Institutional Strengthening and Training
I Strengthening
Activity
Position
(Responsibilities)
Strengthening Programme Schedule Cost
Mitigation
measures
(covered under
EMP)
All personnel of PIU
engaged in
construction activities
Principles and policies for environmental mitigation in development projects
Basic features of the EMP
Environmental clauses in contract and their implications
7 days 3.0
Monitoring
measures
(covered under
Env.
Monitoring)
All officers of
environmental cell Monitoring requirements, monitoring techniques
Laws and other statutes associated with proposed project and various pollution control acts, environment (protection) act, mining act, hazardous material (handling) act, forest (conservation) act
Natural rehabilitation and resettlement policy
Environmental elevation techniques
Reporting requirement and mechanism
10 days 5.0
Total 8.0
II Training
Activity
Participants Course Content Schedule Cost
EMP
implementation
Re-design
conflict
resolution
All PIU engaged in
construction activity
and personnel of
environmental cell
Construction stage
environmental concern Construction stage environmental
concern including hot spot mitigation matrix
Environmental design and implementation plan
Grievance redressal methods and mechanism
7 days 3.0
Environmental
Process,
methods and
equipment
All personnel of
environmental cell
Comprehensive course
for environmental
surveys and statutory
requirement for
environmental and
forestry clearance
Environmental surveys including ambient air, noise, biological and water quality surveys.
Social surveys, survey questionnaire design, sampling techniques
Contract documents and incorporation of environmental clauses
Community consultation and
10 days 6.0
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 226
participatory technology generation methods
Legal or statutory requirement for environmental, social and forestry clearance of developmental projects
Environmental
policies and
programmes
All newly appointed
member of PIU,
apprentice, contractors
and NGO
Basic course Basic features of EIA & EMP
Principles and policies for environmental mitigation in development projects
Introduction to the designs, implementation schedule
Laws and other statues associated with proposed project and various pollution contracts
7 days 3.0
Total 12.0
Grand Total 20.0
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 227
Table 18.5 : Scheduling and Reporting
Sl.
No.
Activity Year 1 Year 2 Year 3 Year 4 Year 5
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Mitigation Measures
1. Catchment area treatment
2. Compensatory afforestation - - - - - - - -
3. Green belt development - - - - - - - -
4. Muck disposal
5. Borrow area treatment - - - - - - - -
6. Subsidized fuel arrangement
7. Solid waste management
8. Biodiversity management - - - - - - - -
9. Health management
10. R & R Plan - - - - - - - -
Monitoring
1. Environment monitoring
2. Muck disposal (monthly)
3. Erosion and siltation
4. CAT plan - - - - - - - - - -
Institutional Strengthening
1. Personnel of PIU - - - - - - - - - - - - - - - - -
2. Personnel of env. cell - - - - - - - - - - - - - - - - -
Training
1. EMP Implementation - - - - - - - - - - - - - - - - -
2. Environmental process,
methods and equipment
- - - - - - - - - - - - - - - - -
3. Environmental policies and
programmes
- - - - - - - - - - - - - - - - -
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 228
18.12. Cost of Environment Monitoring Programme
The total cost of environment monitoring plan works out to Rs 82.00 lac and is given
in Table 18.6.
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 229
Table 18.6 : Summary of Environment Monitoring Programme Sl.
No.
Aspect Parameters to
be monitored
Frequency
Location
Cost Estimates
(Rs. lac)
Implementing and
Pursuing Agency
During
Construction
During
Operation
During
Construction
During
Operation
Total
1 Air Quality
monitoring
SO2, NO
X, PM10
Quarterly for
5 years
Quarterly
for 2 years
4 locations as already
specified 9 3.6 12.6
J & K Pollution Control
Board or any approved
agency of MOEF
2 Noise Quality
Monitoring
Noise level Quarterly for
5 years
Quarterly
for 2 years
4 locations as already
specified 3 1 4
J & K Pollution Control
Board or any approved
agency of MOEF
3 Water quality
Monitoring
All parameters
given in water
quality
Quarterly for
5 years
Quarterly
for 2 years
4 locations as already
specified 12 4.8 16.8
J & K Pollution Control
Board or any approved
agency of MOEF
4 Water-related diseases Identification of
water-related
diseases, adequacy
of local vector
control and curative
measures etc.
Half yearly for
5 years
Half yearly
for 2 years
Villages adjacent to project
sites & labour colonies
6.5 2.5 9 C. M. O. (Kishtwar)
5. Erosion and Siltation Soil erosion rates,
Stability of banks
summer and
post
monsoon for
5 years
Daily Silt
observation
Dam site
5 0 5 Project Proponent as a
routine monitoring
6. Study on ecological flow
and research on endemic
fish fauna
- - - -
6 0 6 Cold Water Fisheries
Department through P.P.
7. Ecosystem
monitoring :
- Terrestrial & Aquatic
fauna
- Environmental studies
- Public awareness
programme
Wild life census,
field surveys
Once Once Free draining catchment
area of the project 9 0 9 J & K Forest Deptt. or WII
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 230
8. Celebration of Environment Day & Other Awareness raising programmes
Yearly for 5 years
- At village Gulabgarh 4 0 4 J & K Forest Deptt.
9. Miscellaneous like
payment to JKPCB for
fees in regard to consent
to establish the project
etc.
15.5 0 15.5 Project proponent
Total 70.00 11.90 81.90
Say 82.00
Environmental Management Plan Report for 930MW Kirthai-II Hydro Electric Power Project, District Kishtwar, Jammu & Kashmir
EQMS INDIA PVT. LTD. 231
19. SUMMARY OF COST
19.1. Summary of Cost
The summary of cost estimate of various environment management plans as contained
in this report is enumerated below in Table-19.1.
Table 19.1 : Summary of Total Cost Estimate
S. No. Plans Cost (Rs. In Lac)
1. Catchment Area Treatment Plan 5000
2. Compensatory Afforestation Scheme 1800.00
3. Wildlife and Bio-diversity Management plan 110.00
4. Fisheries Management Plan 760.00
5. Resettlement & Rehabilitation Plan (for community development
works alone)
2954.00
6. Green Belt Development Plan 29.00
7. Reservoir Rim Treatment Plan 828.00
8. Muck Management Plan 1239.00
9. Restoration Plan for Quarry Sites Landscape and Restoration Plan 125.00
10. Disaster Management Plan 55.00
11. Water, Air and Noise Management Plan 95.00
12. Public Health Delivery Plan 160.00
13. Labour Management Plan 96.00
14. Sanitation and Solid Waste Management Plan 500.00
15. Local Area Management Plan 1135.00
16. Environmental Safeguards During Construction Activities Including
Road Construction
40.00
17. Energy Conservation Measures 346.00
18. Environmental Monitoring Plan 82.00
Grand Total 15354.00