Cover Letter
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of Cover Letter
Yuwana Nugraha
Jalan Ciledug Raya No.99 Apartemen Pakubuwono Terrace Tower North 17th Floor – Unit B1
Jakarta Indonesia 12230 Tel: +62 21 22770406
Cell: +62 878 29751805 [email protected]
Date: 5th of June 2018
Attn:
HUMAN RESOURCE DEPARTMENT
Dear Sir/Madam,
I am writing this letter to introduce myself to you as Project Engineer at my current work, as feel my background in developing as Engineering Departement will be interest to you.
Hardworking, fast learning and responsible are the best description about me. I have an experience in subsea project for engineering and installation with DSV vessel (ROV, Air diving and Saturation diving). My current work allowed me to develop and strengthen my technical skills especially at Project Engineer. Working experience really taught me to understanding and capable to use related software such as Autocad 2D and 3D, Staad Pro and Ansys very well.
I am impressed by the reputation and fast growth of your company, it would be great to be part of your team. My enclosed CV will elaborate more about my skill and experience. I believe that my qualification will surely meet your needs
I would be grateful if you could give me an opportunity for an interview at your earliest convenience. Thank you for your time and interest and I look forward to hearing from you. You can email me at [email protected] or contact me at +62 878 29751805.
Sincerely,
Yuwana Nugraha
Enclosures:
Curiculum Vitae
Certificate
Cover Letter
The undersigned hereby certifies that all information given in this document is true and correct.The undersigned hereby certifies that all information given in this document is true and correct.
Yuwana Nugraha Age : 27 years old Jalan Ciledug Raya No. 99, Apartemen Pakubuwono Terrace Tower North 17th Floor – Unit B1, Jakarta Indonesia 12230 Tel: +62 21 22770406 Cell: +62 878 29751805 [email protected]
Objective To obtain a responsible position as a Project Engineer where that is my especiallytechnical skills.
Education 2013 ‐ 2016 Mercu Buana University
B.Sc.Eng. (Bachelor of Science in Civil Engineering) with GPA: 3.14 2007 ‐ 2010 Polytechnic of Bandung (POLBAN)
Dipl Eng. (Diploma in Civil Engineering) with GPA: 2.7
Skills Computer Skills Competent for drawing design software :
‐ AutoCAD 2D and 3D ‐PDMS Competent for Structure software : ‐ Staad Pro – finite elements program, for structure design, had been used for basicstatic and dynamic analysis and design. Competent for engineering software : ‐ Mathsoft MathCAD 14. Competent for another related software : ‐ Microsoft Office computer programs (WORD, EXCEL, POWERPOINT, OUTLOOK)
Other Skills ‐ Have experience with API, ASME, and DNV codes, standards, and recommended
practices. ‐ Knowledge of installation of pipeline systems. ‐ Excellent communication and interpersonal skills. ‐ Effective leadership and headship ability. ‐ Superb associational and organizational skills.
Curriculum Vitae
Work Experience
Aug 2009 – Aug 2010 PT. Waskita Karya (Bandung, West Java Indonesia) Position: Civil Engineer Project Title: High Rise Building STT II Telkom Bandung, West Java Indonesia ‐ Survey coordinate calculation ‐ Cut and filled earthworks ‐ Foundation analysis and design (Bore Pile) ‐ Bore pile construction and installation ‐ Structure (Beam and Column) analysis and design
Sep 2010 ‐ Mar 2011 PT. Basuki Pratama Engineering
Position: Civil/Structure Engineer Project Title: Boiler 20ton Construction and Installation at PT.Yamaha, PT.Mitsubishi and PT. Dragon ‐ Structure analysis for manufacture equipment, such as boiler, tank, ducting
(elbow, reducer, transition and round ducting), thermal oil, economizer andevaporator.
‐ Structure installation with program CADCAM connected to NC plasma DAMA.
Mar 2011‐ Mar 2012
PT. Lintech Duta Pratama Position: Civil/Project Engineer Project Title: (2011) Jetty Construction 10.000 DWT at PT. Lintech Seaside Facility, Paciran EastJava Indonesia ‐ Survey coordinate calculation ‐ Reclamation of earthworks ‐ Cut and filled of earthworks ‐ Foundation analysis and design (Sheet Pile) ‐ Sheet pile construction and installation ‐ Structure (Beam and Column) analysis and design ‐ Break water analysis and design (2012) Foundation Analysis and Design for Whinch (Air Tugger) and Shelter ofConveyor at PT. KPC (Kalimantan Prima Coal), Sangatta Indonesia ‐ Foundation analysis and design for dynamic load (Foot Plate) ‐ Foot plate and reinforcement bar construction and installation
Curriculum Vitae
Mar 2012‐ Present
(2012) Infrastructure Works (Workshop, Portal Crane, Blasting and Painting Roomat PT. Lintech Seaside Facility, Paciran East Java Indonesia ‐ Survey coordinate calculation ‐ Cut and filled of earthworks ‐ Foundation analysis and design (Foot Plate) ‐ Foot plate construction and installation ‐ Structure (Beam and Column) analysis and design ‐ Structure construction and installation PT. Marine Engineering Services Position: Project Engineer Project Title: (2012) PCP‐PF Subsea Power Cable Installation at PT. PHE ONWJ ‐ DSV deck arrangement for install reel, tensioner and chute on deck ‐ DSV proposed location ‐ As found survey the cable route by ROV ‐ Subsea power cable installation ‐ Mattress installation for support crossing cable and pipeline ‐ As built survey new cable route by ROV (2012) Umbilical Installation at PT. Star Energy ‐ DSV deck arrangement for install reel, tensioner and chute on deck ‐ DSV proposed location ‐ As found survey the umbilical route by ROV ‐ Umbilical installation ‐ Mattress installation for support crossing umbilical and pipeline ‐ As built survey new umbilical route by ROV (2012) Develop Procedure for Diving Campaign Work Package Inspection 2012‐2014 at PT. PHE ONWJ ‐ Structure Underwater Inspection ‐ Structure Maintenance and Repair ‐ Pipeline Inspection ‐ SPM Inspection ‐ CP Retrofit Installation
Curriculum Vitae
(2013) 8in MGL LLA‐LLB Riser and Pipeline Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new pipeline ‐ As built survey by ROV (2013) SPM#4 Subsea Hose Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing subsea hose by ROV ‐ Static rigging installation under SMP#4 ‐ Static rigging installation at PLEM ‐ Subsea hose replacement ‐ As build survey the new subsea hose by ROV (2013) 24in APND Tee Encapsulated Clamp Installation at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Install Tee Encapsulated Clamp ‐ As built survey by ROV (2014) 8in MGL ZUD Riser Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing riser by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new riser ‐ As built survey by ROV
Curriculum Vitae
(2014) 12in MGL LC‐LPRO Riser and Pipeline Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new pipeline ‐ As built survey by ROV (2014) SSTB Buoy and X‐Mas Tree Riser Replacement at PT. ConocoPhillips (Belida)‐ DSV proposed location ‐ As found survey the existing SSTB and X‐Mas Tree Riser by ROV ‐ Static rigging installation at SSTB ‐ SSTB buoy and X‐mas tree riser replacement ‐ As build survey the new SSTB and X‐Mas Tree Riser by ROV (2014) Subsea Control (SCM and EDB) Replacement at PT. ConocoPhillips (KerisiHiu) ‐ DSV proposed location ‐ As found survey the existing SCM and EDB by ROV ‐ Static rigging installation (Sky Hook) at PLEM ‐ Subsea control SCM and EDB replacement ‐ As build survey the SCM and EDB by ROV (2015) Develop Procedure for Diving Campaign Work Package Inspection 2015‐2017 at PT. PHE ONWJ ‐ Structure Underwater Inspection ‐ Structure Maintenance and Repair ‐ Pipeline Inspection ‐ SPM Inspection ‐ CP Retrofit Installation (2015) ZUB, ZUE and ZUF Subsea Power Cable Installation at PT. PHE ONWJ ‐ DSV deck arrangement for install reel, tensioner and chute on deck ‐ DSV proposed location ‐ As found survey the cable route by ROV ‐ Subsea power cable installation ‐ Mattress installation for support crossing cable and pipeline ‐ As built survey new cable route by ROV
Curriculum Vitae
(2016) SPM#3 Subsea Hose and Valve Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing subsea hose and valve by ROV ‐ Remove Floating hose at SPM#3 ‐ Static rigging installation under SMP#3 ‐ Static rigging installation at PLEM1 and PLEM2 ‐ Subsea hose and valve replacement ‐ Re‐install floating hose at SPM#3 ‐ As build survey the new subsea hose and valve by ROV (2016) 8in MGL FWB‐FWA Riser and Pipeline Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new pipeline ‐ As built survey by ROV (2016) 24in MGL APNA‐MMC Pipeline Hot Tap and Replacement at PT. PHE ONWJ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Install tapping machine on location ‐ Install stopple machine on location ‐ Install by pass gas pipeline ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new pipeline ‐ Recover by pass gas pipeline ‐ Install lock o ring ‐ Recover stopple ‐ As built survey by ROV (2016) CP Retrofit Installation at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the propose location by ROV ‐ Cleaning VDM ‐ Install anode pod at proposed location ‐ As built survey by ROV
Curriculum Vitae
(2016) Pipeline Leak Rectification at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the leak location by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Clamp installation ‐ As built survey by ROV (2017) 8in MGL YA‐B1C Riser and Pipeline Replacement at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install new pipeline ‐ As built survey by ROV (2017) CP Retrofit Installation at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the propose location by ROV ‐ Cleaning VDM ‐ Install anode pod at proposed location ‐ As built survey by ROV (2017) Pipeline Leak Rectification at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the leak location by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Clamp installation ‐ As built survey by ROV (2017) 8in 3Phase FWB‐FWA Flexible Pipeline Installation at PT. PHE ONWJ ‐ DSV proposed location ‐ As found survey the existing pipeline by ROV ‐ Seabed preparation (excavation) ‐ Pipeline Preparation (Coating removal, Cleaning, CVI, UT and Ovality) ‐ Cutting Pipe ‐ Install Mechanical connector / flange connector ‐ Metrology ‐ Install / laying new flexible pipeline ‐ As built survey by ROV
Curriculum Vitae
Course & Seminars
Course ‐ CSWIP, 3.4u Inspection, September 2017 ‐ Oil Institute, PDMS design (Structural, Pipeline and Equipment), March 2011 ‐ UPT Gambar POLBAN, Autocad 2D and 3D, April 2010
Seminars Reference
‐ Civil Engineering, Geotechnical of Scientific, November 2010
Roger Dennerley
Offshore Construction Manager (Offshore Saturation Diving Specialist)
Curriculum Vitae
crea
ted
with
Fact
ory
trial
ver
sion
ww
w.pd
ffact
ory.
com