Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 1
Scope of Work –
Carrying out Traffic Surveys in Telangana (NH07) and Tamil Nadu
(NH4 & NH45): Pkg3
Scope of work, Submission and payment will be as follows:
1. Scope of Work:
Carrying out traffic surveys as described below in the Figure: Surveys location map and
Table: Traffic Surveys summary by adhering to the survey objectives, survey time period,
terms & conditions, payment schedule and checklist which are mentioned in detail in the
sections 2, 3, 4, 5 and 7. Submit the quotation as per the details mentioned in the section no.6
along with item rates for additional traffic surveys as per details mentioned in section 6.1. The
traffic survey forms and targeted sample of each traffic survey is provided in the annexure.
Study area and Location map:
The study area is in the states of Telangana and Tamil Nadu. Project corridor in Telangana
state is along NH07 (Old NH numbering) (Varanasi to Kanyakumari highway) consists of one
section from Kothakota bypass to Kurnool. Project corridor in Tamil Nadu state is along NH4
& NH45 (Old NH numbering) – Chennai bypass. The below mentioned table and picture
summarizes the highway corridors for the traffic study. The below pictures depicts the highway
stretches including Study area along with the traffic survey locations.
Table: Project Corridors for the Traffic study
S.no. Project/Corridor State Highway Length (in
kms)
No. of Toll
Plazas
1 Kothakota bypass to Kurnool Telangana NH07 (old)
75 1
2 Chennai Bypass Tamil Nadu NH4 & NH45 (old)
32 2
All Projects / Corridors Telangana and Tamil
Nadu 107 3
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 2
Figure 1: Kothakota bypass to Kurnool corridor (Old NH07) in the state of Telangana
Figure 2: Chennai bypass (Old NH4 & NH45) in the state of Tamil Nadu
Figure: Study Area and Survey Locations
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 3
In addition to the toll plaza locations, traffic surveys are also planned on the major adjacent
roads of these highway corridors. Some of the locations on the adjacent roads are planned
and mentioned in the table below along with traffic surveys and duration. In case of any
additional surveys required the survey agency needs to be carried out as per the objectives
and scope for which payment will be done on item rate basis. The entire traffic surveys are
planned for completion in the duration of fifteen (15) days including data coding and
processing.
Table: Traffic surveys – Toll Plaza Locations
S.no. Traffic survey Survey
duration (days & hours)
No. of Locations
Remarks
1 Traffic count – Video count
7 days X 24hr 3 Toll Plaza
Locations (refer previous table and
picture)
2 Origin – Destination survey
1 day X 24hr 3
3 Registration plate survey
1 day X 24hr 3
Table: Traffic surveys – Adjacent Roads / Project road
S.no. Traffic survey Survey
duration (days & hours)
No. of Locations
Remarks
1 Traffic count – Video count
3 days X 24hr 3 Alternate roads to Chennai Bypass
1. ORR 2. NH45 (Paranur TP) 3. NH45 (City)
2 Origin – Destination survey
1 day X 24hr 2
2. Survey Objectives:
a) Classified Vehicle Counts – Using Videography Method
Classified vehicle volume counts shall be conducted at identified locations for a period
specified in the survey plan using videography method. The output should present direction
wise and Category wise, hourly flow, 15 minute flow and daily variation. Care must be taken
on clear visibility should be ensured before the start of survey itself. The traffic count summary
Toll Plaza
Alternate Survey Location
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 4
for every day should be provided to client in soft copy (MS Excel) within 4 days of conclusion
of each traffic count survey. The filled-in survey formats (hard copy) along with Video data in
a hard disk should be submitted by the end of the corresponding week.
b) Origin-Destination (OD) Survey
Origin-destination surveys shall be conducted through roadside interviews at all the stretches
identified for a period of 24 continuous hours for the specified day. The information shall be
obtained by trained enumerators and experienced supervisors and include: type of vehicle,
origin, destination, frequency of passenger (additional query “purpose”) and goods vehicles
(additional query “commodity”). Based on the survey, travel desire pattern will be established.
The coded OD survey data should be provided to client in soft copy (MS Excel) within 4 days
of conclusion of the OD survey. The filled-in survey formats (hard copy) should be submitted
by the end of the corresponding week.
c) Registration plate Survey
Registration plate count survey has to be conducted for 1 day along with the Videographic
volume count survey for all the tollable commercial vehicles category to identify the Local
district commercial vehicles. The information shall be obtained by trained enumerators and
experienced supervisors. Based on the survey, percentage of national and non-national permit
vehicles will be established. The registration plate count summary for survey location should
be provided to client in soft copy (MS Excel) within 4 days of conclusion of the parking
accumulation (count) survey. The filled-in survey formats (hard copy) should be submitted by
the end of the corresponding week.
3. Time Period of Completion
Surveys to be commenced from the date specified after the approval from the
approving authority and should be completed within 15 days from the date of start of
work this shall incude the data coding and processing.
Data Coding, Punching (converting it to soft copy) shall be carried out simultaneously
at site and in no case deliverables of the soft copies shall be beyond 5 days after the
completion of the respective survey.
Any suggestion/correction should be incorporated and submitted in 3 days’ time from the date
of issuing the work order.
4. Terms and Conditions
1) A trained and experienced Supervisor shall be present at all times at all the survey
locations.
2) As mentioned in the survey plan, the mentioned number of enumerators shall be
placed at all the survey locations for all the days of the surveys.
3) All the survey forms in hard copies for conducting all traffic surveys and stationery
items (pens, pads etc.) shall be procured by the traffic survey agency; the softcopy of
the survey format will be provided by the Client
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 5
4) All the necessary infrastructure required for smooth conduct of surveys such as safety
jackets, lighting (for night times or low light conditions), temporary seating
arrangements, tents, traffic cones, batons, etc. should be provided by the survey
agency and it is the responsibility of the survey agency to maintain the same for the
whole duration of the surveys.
5) All the traffic survey enumerators and supervisors should be well trained and
experienced before the start of each survey. The mandatory age of all the enumerators
shall be minimum as prescribed and applicable by the local laws.
6) Manpower deployment should be as per commitment. DIMTS reserves the right to
conduct checks at random, and in case of any discrepancy, you would have to repeat
that particular survey on the same day of the week and the cost of the repeated survey
will be borne by the survey agency.
7) Data Coding and punching in MS Excel has to be done for all the traffic surveys in the
English language only and submitted vide e-mail within the stipulated time agreed prior
to the commencement of survey.
8) In case DIMTS is not satisfied with the quality of either data collection or data coding,
you may be asked to repeat that particular survey on the same day of the week and
the cost of the repeated survey will be borne by the survey agency.
9) Termination: This agreement may be terminated at any point of time which can also
be due to the reasons beyond control of the client. If the reason for termination is due
to non-performance or non-adherence to the principles of the survey (data collection)
by the survey agency (vendor) then no payment shall be made to the survey agency.
10) If the work is not completed within the stipulated time frame, unless the reasons are
beyond control, a penalty of 0.5% of total fee will be levied on per day basis.
11) The cost of local conveyance (to and fro from survey locations), food and any other
daily allowance of all the Supervisors and enumerators shall be borne by the survey
agency.
12) Survey schedule and contact numbers of the deployed team should be communicated
to the Client (DIMTS) at least 24 hours prior to commencement of the survey.
13) Survey agency team should follow the checklist given below at all the time of the traffic
survey.
Apart from the above-mentioned terms and conditions, checklist provided as part of the work
order should also be strictly followed
5. Payment Schedule
The payment to the survey agency shall be made in Indian (INR) currency. Payment will be
made upon raising the invoice as per following schedule:
1. 30% mobilization fee.
2. 30% amount shall be released after completion of the surveys.
3. 40% amount shall be released after submission of all data in soft and hard copies and
incorporating all corrections/ suggestions, if any.
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 6
5.1. Penalty
If the work is not completed within the stipulated time frame, unless the reasons are beyond
control, a penalty of 0.5% of total fee will be levied on per day basis where the Final penalty
is limited to 10% of the Quote value.
6. Quotation
Submit the quotation under major heads mentioning the rates along with the total amount in
the Indian currency excluding taxes.
Table: Survey Quotation summary with fee rates and Quantity
S.no Traffic Survey Duration
of survey
Quantity (Survey
Locations)
Rate (per Unit)
Total Amount
Remarks
A B A * B
1 Traffic count – Video count
7 days X 24hr
3 Toll Plaza Locations on project corridors
2 Origin – Destination survey
1 day X 24hr
3
3 Registration plate survey
1 day X 24hr
3
4 Traffic count – Video count
3 days X 24hr
3 Adjacent roads / Project
road 5 Origin – Destination survey
1 day X 24hr
2
Total Amount in Rs. (Amount in Numbers)
Total Amount in Rs. (Amount in Words excluding taxes):
Taxes applicable (GST):
Total Amount in Rs. (Amount in Words including taxes):
6.1. Additional scope of work
Any additional surveys (including duration and type of surveys) beyond the surveys mentioned
in the scope of work will be paid on item rate which shall be paid as per the quotes provided
below.
Table: Item rates for Additional Traffic surveys
S.no. Additional Traffic Surveys
(Adjacent roads) Survey Duration
Rates (in Rs.) per Location
1 Traffic count - video TVC - 24h X 7d
Scope for
Traffic
Surveys
TRAFFIC SURVEYS FOR TOLL OPERATE
TRANSFER (TOT) Bundle 3: Package3,
TELANGANA & TAMILNADU
Page 7
S.no. Additional Traffic Surveys
(Adjacent roads) Survey Duration
Rates (in Rs.) per Location
2 Traffic count - video TVC - 24h X 3d
3 Traffic count survey-manual TVC - 24h X 3d
4 OD Survey - 24hr OD - 24h X 1d
7. Checklist:
For survey supervisors and enumerators
Checklist during Traffic Surveys
1 All survey supervisors and enumerators present at site should be wearing reflective jackets as safety precautions
2 Enumerators should be clearly briefed and tested about category of vehicle and its identification, that they are counting and interviewing (OD survey)
3 Mock survey of minimum of 30 min. at start of the day is ensured at all locations
4 Survey locations are set up on either side of the road to cater to each direction of traffic.
5 Enumerators for change of shift on day one are at site at least an hour before their slot and briefed and tested for category of vehicles
6 Survey is being carried out with relievers (already considered in the manpower requirement) at all locations - to cover during breaks/shifts
7 Enumerators are taking break for food/rest only if relievers (already considered in the manpower requirement) are taking their place
8 Surveys are continuously and thoroughly supervised;
9 Proper precautions shall be taken care of like the anticipation of rain which should not hamper the survey progress
10 Frequent checks are done to ensure that enumerators are completely aware of the category of vehicle that are counting
11 The responses for OD survey should be recorded in English language preferably and the coded and punched data shall be sent in English language only
ANNEXURE: Traffic Survey Forms
Survey Forms attached S.no Traffic Survey Survey Forms Remarks
1 TVC survey (video / manual)
Attached (Passenger & Goods traffic separate personnel per direction)
100% data
2 OD survey Attached Sample basis (40% to 50%)
3 Registration plate survey
Attached 100% data
Location: Chainage : Date: Shift: Day / Night
Direction: From To NH/SH/OTH No: Enumerator: Sheet:
Time* 2 Wheeler Passenger Auto Cars/Vans/ Jeep (Private )Cars/Vans/
Jeeps (Taxi )
Shared Vehicle (
Tata Magic etc.)Mini Buses
Buses (State
Roadways-
2axle)
Buses (Private-
2axle)
3axle Buses
(Govt & Pvt)
Govt. Cars/
Jeep/ Vans
Ambulance/Poli
ce, Army BusCycle
Cycle
Rickshaw
Animal/
Hand drawn
cart
(15 mins)
:00
to
:15
:15
to
:30
:30
to
:45
:45
to
:00
TOTAL
Conducted by : DIMTS Ltd. Delhi
Non-MotorizedPassenger Vehicles Toll Exempted
Classified Traffic Volume Count
TRAFFIC STUDY FOR TOT PROJECTS
PASSENGER VEHICLES
Delhi Integrated Multi Modal Transit System Limited, Delhi
Location: Chainage : Date:
Direction From: To: NH/SH/OTH No: Enumerator:
Type 1 (Mini LCV - Tata Ace,
Mahindra pickup)Type 2 (4 Tyre) Type 3 (6 Tyre)
(4-6 Axles)
/HCM/EME7 or more Axles
(15 mins) -------
:00
to
:15
:15
to
:30
:30
to
:45
:45
to
:00
Total
Note: HCM = Heavy Construction Machinery, EME = Earth Moving Equipment
Goods Vehicles
LCV's
TRAFFIC STUDY FOR TOT PROJECTSClassified Traffic Volume Count
GOODS VEHICLES
OthersTime* 2 - Axle Trucks
3 - Axle Trucks
(10 tyre)
MAV's
Army
trucks
Agriculture
Tractor-trailer
Toll Exempted Vehicle
Goods AutoAgriculture
Tractor
Delhi Integrated Multi Modal Transit System Limited, Delhi
Location & Ramp no : ___________________________ Date ___________________________ Shift ____________________
Direction : ___________________________ Time ___________________________ Sheet ___________________
Frequency Trips
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
1 Car Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D) 1 Office / Company Work 7 Hospital / Clinic
2 Taxi 2 Multiple Entry Weekly (W) 2 Business 8 Home
3 Shared Jeep NO 3 Monthly Pass Monthly (M) 3 Social (Marriage,Relation,etc.) 9 Shared Vehicle
4 Mini Bus (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O) 4 Education (College,School,Institute) ( Bus,Local Jeep)
5 Bus Not Relevant 5 Local Pass - Trucks 5 Tourism / Religious
6 Others 6 Shopping
Conducted by : Delhi Integrated Multi Modal Transit System Limited (DIMTS) Name & Signature of Supervisor :
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
TRAFFIC STUDY FOR TOT PROJECTSORIGIN DESTINATION SURVEY (PASSENGER VEHICLES)
Frequency (यातरा की आवतति)
Type of Toll Receipt[TICK MARK]
Trip PurposeTime
(समय)
Vehicle Type
(वाहन क परकार)Registration
Plate No.
(First 4 Digits)
Origin (उतपतति) Destination (मतिल)
Due to Bridge
construction at
Vasai creek,
are you
travelling on this
route
Location & Ramp no : ___________________________ Date ________________ Shift ___________________
Direction : ___________________________ Time ________________ Sheet __________________
Frequency Trips
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
1 Mini LCV Area (ग ाव / शहर) Area (ग ाव / शहर) YES 1 Single Entry Daily (D)
2 LCV 2 Multiple Entry Weekly (W)
3 2-Axle NO 3 Monthly Pass Monthly (M)
4 3-Axle (जिल )/ (र जय) (जिल )/ (र जय) 4 Local Pass - Cars Occassionally (O)
5 MAV(4-6 axle) Not Relevant 5 Local Pass - Trucks
6 MAV(>6 axle) 6 Others
Conducted by : Delhi Integrated Multi Modal Transit System Limited (DIMTS) Name & Signature of Supervisor :
Due to Bridge
construction at
Vasai creek, are
you travelling on
this route
TRAFFIC STUDY FOR TOT PROJECTSORIGIN DESTINATION SURVEY (GOODS VEHICLES)
District
/State
District
/State
District
/State
Time
(समय)
Frequency (यातरा की आवतति)
Commodity Carried
(वसि क परकार)Vehicle Type
(वाहन क परकार)Registration
Plate No.
(First 4 Digits)
Origin (उतपतति) Destination (मतिल) Type of Toll Receipt[TICK MARK]
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
District
/State
Location & Ramp No : Chainage: Sheet no:
Direction : To: Enumerator: Date:
Vehicle Registration No: MH - 04
STATE PERMITNATIONAL
PERMITSTATE PERMIT Other STATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMIT
:00
to
:15
TOTAL
:15
to
:30
TOTAL
:30
to
:45
TOTAL
:45
to
:00
TOTAL
Local District Vehicles Count - Passenger Commercial Vehicles
Time*
Passenger Vehicles
Bus (STU)
TRAFFIC STUDY FOR TOT PROJECTS
TaxiShared Vehicle (Tata Magic, Jeep
etc.)Bus (Private)Mini Bus
Delhi Integrated Multi Modal Transit System Limited, Delhi
Location & Ramp No: Chainage: Sheet no:
Direction : To: Enumerator: Date:
Vehicle Registration No: MH - 04
(15 mins) STATE PERMITNATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMITSTATE PERMIT
NATIONAL
PERMIT
:00
to
:15
TOTAL
:15
to
:30
TOTAL
:30
to
:45
TOTAL
:45
to
:00
TOTAL
Note: HCM = Heavy Construction Machinery, EME = Earth Moving Equipment
Mini LCVs (Tata Ace, Mahindra
Pickup etc.)
TRAFFIC STUDY FOR TOT PROJECTS
Local District Vehicles Count - Goods Vehicles
Time* 2 - Axle Trucks 3 - Axle Trucks
MAV's
Type 1 (4-6 Axles) and HCM/EME
Light Commercial Vehicles
(LCVs)
Goods Vehicles
Type 2 (7 or more Axles)
Delhi Integrated Multi Modal Transit System Limited, Delhi