budget memorandum 2012-2013 volume ii - BEAMS

149
P1 BUDGET MEMORANDUM 2012-2013 VOLUME II H 4129—A

Transcript of budget memorandum 2012-2013 volume ii - BEAMS

P1

BUDGET MEMORANDUM2012-2013

VOLUME II

H 4129—A

P2

H 4129—1

PLAN—SECTION-INEW ITEM FOR 2012-2013

P3

CONTENTS

Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

GENERAL ADMINISTRATION DEPARTMENT2075, Miscellaneous General Services

1 Provision for expenditure for Birth Centenary … 1,00,00,00 1,00,00,00 P9Celebrations of Late Shri Yeshwantrao Chavan.

Major Head 2075 Total … … 1,00,00,00 1,00,00,00

Total General Administration Department … … 1,00,00,00 1,00,00,00

AGRICULTURE, ANIMAL HUSBANDRY,DAIRY DEVELOPMENT AND FISHERIESDEPARTMENT2415, Agriculture Research and Education

2 Provision for Grant in Aid to Dr Balasaheb Sawant 1,00,00 1,50,00 2,50,00 P13Konkan Krishi Vidyapeeth for Horticulture College.

3 Provision for Grant in Aid to Dr Balasaheb Sawant 1,30,00 2,70,00 4,00,00 P14Konkan Krishi Vidyapeeth for post harvestManagement College.

Major Head 2415 Total … 2,30,00 4,20,00 6,50,00

Total Agriculture, Animal Husbandry, Dairy … 2,30,00 4,20,00 6,50,00

Development and Fisheries Department

SCHOOL EDUCATION AND SPORTS DEPARTMENT2202, General Education

4 Grant in aid to two divisions of Higher Secondary 1 … 1 P19School in the Non TSP area.

Major Head 2202 Total … 1 … 1

Total–School Education and Sport Department … 1 … 1

PUBLIC WORKS DEPARTMENT3054, Roads and Bridges

5 Provision of road construction under BOT. ... 3,00,00 3,00,00 P23

Major Head 3054 Total … ... 3,00,00 3,00,00

4059, Public Works

6 Provision for construction of court buildings ... 5,61,84 5,61,84 P24

7 Provision for various works at Rajbhavan ... 36,80 36,80 P25

8 Provision for sales tax office buildings ... 5,00,00 5,00,00 P26

9 Provision for construction of various revenue buildings ... 9,75,87 9,75,87 P27

10 Provision for construction of Dep. RTO building ... 4,05,00 4,05,00 P28

11 Provision for construction of Treasury offices ... 1,65,52 1,65,52 P29

12 Provision for construction of Inspection Bunglow ... 3,74,90 3,74,90 P30and rest houses.

13 Provision for construction of administrative buildings ... 9,58,98 9,58,98 P30

Major Head 4059 Total … … 39,78,91 39,78,91

H 4129—1a

P4

CONTENTS

Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

4202, Capital Outlay on Education, Sports, Arts and Culture

14 Provision for construction of Government Polytechnics ... 13,04,63 13,04,63 P31

15 Provision for construction of Girls hostels in ...5,70,00 5,70,00 P32Government polytechnics.

16 Provision for construction of new Government ... 1,34,19 1,34,19 P33Polytechnics

17 Provision for construction of Government Engineering ... 4,50,30 4,50,30 P34and Pharmacy Colleges.

18 Provision for construction of girls hostel in Government ... 1,00,00 1,00,00 P34Engineering and Pharmacy College.

19 Provision for construction of various works in Government ... 6,39,20 6,39,20 P35Polytechnics under backlog.

Major Head 4202 Total … … 31,98,32 31,98,32

4210, Capital Outlaly on Medical and Public Health

20 Provision for construction of urban hospitals ... 22,63,04 22,63,04 P36

21 Provision for construction of of Rural hospitals ... 10,30,40 10,30,40 P38

22 Provision for construction of rural hospitals under ... 15,81,26 15,81,26 P39backlog

Major Head 4210 Total … … 48,74,70 48,74,70

4216, Capital Outlaly on Housing

23 Provision for Government residential buildings ... 7,76,25 7,76,25 P41

24 Provision for Construction of Judicial officers/ ... 12,19,00 12,19,00 P42staff quarters

Major Head 4216 Total … … 19,95,25 19,95,25

5054, Capital Outlaly on Roads and Bridges

25 Provision for construction of Road and Bridges ... 1,00,00,00 1,00,00,00 P44umder NABARD Loan

Major Head 5054 Total … … 1,00,00,00 1,00,00,00

Total—Public Works Department … ... 2,43,47,18 2,43,47,18

WATER RESOURCES DEPARTMENT4402, Capital Outlay on Soil and Water Conseration

26 Taking up 13 New Kharland Schemes in Thane, 1 … 1 P75Raigad,Ratnagiri&Sindhudurg District.

Major Head 4402 Total … 1 … 1

P5

4701, Capital Outlay on Major andMedium Irrigation.

27 Administrative approval for Kotgal Barrage Project. 1 … 1 P7528 Administrative approval for Extension and 3 … 3 P76

Improvement works of Various projects.

Major Head 4701 Total … 4 … 4

4702, Capital Outlay on Minor Irrigation.29 Administrative approval for Extension and 4 … 4 P78

Improvement works of Various minorirrigation projects.

Major Head 4702 Total … 4 … 4

Total–Water Resources Department … 9 … 9

RURAL DEVELOPMENT AND WATERCONSERVATION DEPARTMENT2501, Special Programmes for Rural Development

30 Provision for subsidy to Non Scheduled Castes / 4,00,00 … 4,00,00 P81Scheduled Tribes Beneficiaries of MaharashtraState Rural Livelihood Mission.

Major Head 2501 Total … 4,00,00 … 4,00,00

Total Rural Development and … 4,00,00 … 4,00,00Water Conservation Department

SOCIAL JUSTICE AND SPECIALASSISTANCE DEPARTMENT2235, Social Security and Welfare

31 Provision for Indira Gandhi National Handicapped 30,00,00 … 30,00,00 P85Pension scheme launched by Government of India.

32 Provision for Indira Gandhi National Widow Pension 24,00,00 … 24,00,00 P85scheme launched by Government of India.

Major Head 2235 Total … 54,00,00 … 54,00,00

Total Social Justice and Special … 54,00,00 … 54,00,00Assistance Department

HIGHER AND TECHNICAL EDUCATIONDEPARTMENT2230, Labour and Employment

33 Provision to cover the expenses of providing … 45,51,12 45,51,12 P89Machinery, Equipments and Digital facilities to ITI .

34 Provision to cover the expenses of Maharashtra 5,20,75 5,08,00 10,28,75 P89State Skill Development Society.

35 Provision to cover the expenses of “Huner se Rozgar” … 76,13 76,13 P89scheme of Central Government’sTourism Department.

Major Head 2230 Total … 5,20,75 51,35,25 56,56,00

Total Higher And Techinical … 5,20,75 51,35,25 56,56,00Education Department

Grand Total … 65,50,85 10,22,02,43 10,87,53,28

CONTENTS

Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

P6

P7

GENERAL ADMINISTRATION DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—2

P8

P9

2075, MISCELLANEOUS GENERAL SERVICES

800, Other Expenditure

(00)(06) Birth Centenary Celebrations of Late Shri Yeshwantrao Chavan (20750688) (Voted)

50, Other Expenditure

Item No. 1. Provision for expenditure for Birth Centenary Celebrations of Late Shri YeshwantraoChavan.

Recurrent .. Rs. Nil Non-Recurrent .. Rs. 100,00,00,000

Total .. Rs. 100,00,00,000 Ultimate Annual Recurrent .. Rs. Nil

Remarks.— Government has decided to celebrate Birth Centenary year of Late Shri Yeshwantrao Chavanfrom 13th March 2012 to 12th March 2013.Different programmes are to be arranged by various departmentsfor which an outlay of Rs.100,00,00,000 is to be budgeted for financial year 2012-2013.

Accordingly, a provision of Rs.100,00,00,000 is proposed to be made in the Budget Estimates 2012-13 byway of Section I “ New Item”.

———————

GENERAL ADMINISTRATION DEPARTMENT

H 4129—2a

P10

P11

AGRICULTURE, ANIMAL HUSBANDRY, DAIRY DEVELOPMENT ANDFISHERIES DEPARTMENT

PLAN — SECTION-INEW ITEM FOR – 2012-2013

P12

P13

2415, AGRICULTURE RESEARCH AND EDUCATION01, Crop Husbandry

120, Assitance to other Institutions(00)(07), Grant in aid to Dr Balasaheb

Sawant Konkan Krishi Vidyapeeth(24150081)(Plan)(Voted)Rs

31, Grant in Aid (Non-Salary) … 1,50,00,000 36, Grant in Aid (Salary) … 1,00,00,000

Item No. 2. Provision for Grant in Aid to Dr Balasaheb Sawant Konkan Krishi Vidyapeeth.

Recurrent .. Rs. 1,00,00,000 Non-Recurrent .. Rs. 1,50,00,000

Total .. Rs. 1,50,00,000

Total .. Rs. 1,00,00,000 Ultimate Annual Recurrent .. Rs. 1,00,00,000

Remarks.—The Government vide its resolution No. •úÖê•éú×¾Ö-2011/434/¯ÖÏ •Îú 98/7 †ê פü 3 •ÖÖ-Öê¾ÖÖ¸ß 2012 has takendecision to establish Horticulture College at Mulde, Tal.Kudal. Dist.Sindhudurga within the jurisdiction ofDr.Balasaheb Sawant Konkan Krishi Vidyapeeth. Accordingly it has been decided to provide Grant in Aidfor the above purpose.

Agriculture, Animal Husbandry, Diary Development and Fisheries Department has created 49 posts (30-Non-Teaching & 19-Teaching) for proposed Horticulture College on the establishment of Dr Balasaheb SawantKonkan Krishi Vidyapeeth.Details of posts are given below :—

Sr. Designation Pay Structure Number No. ofNo. Pay Band Grade Pay Post(1) (2) (3) (4) (5)

1 Professor (Horticulture) 37400-67000 10000 12 Associate Professor 37400-67000 9000 53 Assistant Professor 15600-39100 6000 134 Agriculture Officer 9300-34800 4400 15 Agriculture Supervisor 9300-34800 4200 26 Agriculture Assistant 5200-20200 2400 47 Gardener 4440-7400 1300 28 Assistant Registrar 9300-34800 4600 19 Assistant Supdt 9300-34800 4300 1

10 Senior Clerk 5200-20200 2400 111 Junior Clerk + Typist + Cashier 5200-20200 1900 212 Store Keeper 5200-20200 1900 113 Security Officer 9300-34800 4600 114 Assistant Labrarian 15600-39100 6000 115 Bus Driver 5200-20200 1900 116 Tractor Driver 5200-20200 1900 117 Lab Assistant 4440-7440 1300 618 Peon 4440-7440 1300 319 Sweeper 4440-7440 1300 120 Electrician 5200-20200 2400 1

Total Post . . 49

Total recurrent and Non-recurrent expenditure for the year 2012-13 is expected to be Rs.1,00,00,000and Rs.1,50,00,000 respectively.Therefore total provision of Rs.2,50,00,000 is proposed to be included in theBudget Estimates 2012-13 by way of Section.I “New Item”.

Accordingly, a provision of Rs.2,50,00,000 is, proposed to be included in the Budget Estimates, 2012-2013 by way of Section-I “New Item”.

——————

AGRICULTURE, ANIMAL HUSBANDRY, DAIRY DEVELOPMENTAND FISHERIES DEPARTMENT

P14

2415, AGRICULTURE RESEARCH AND EDUCATION

01, Crop Husbandry

120, Assitance to other Institutions

(00)(07), Grant in aid to Dr Balasaheb

Sawant Konkan Krishi Vidyapeeth(24150081)(Plan)(Voted)

Rs

31, Grant in Aid (Non-Salary) … 2,70,00,000

36, Grant in Aid (Salary) … 1,30,00,000

Item No. 3. Provision for Grant in Aid to Dr Balasaheb Sawant Konkan Krishi Vidyapeeth.

Recurrent .. Rs. 1,30,00,000 Non-Recurrent .. Rs. 2,70,00,000

Total .. Rs. 2,70,00,000

Total .. Rs. 1,30,00,000 Ultimate Annual Recurrent .. Rs. 1,30,00,000

Remarks.—The Government vide resolution No.•úÖê•éú×¾Ö-2011/434/¯ÖÏ •Îú 120/7 †ê פü 18.10.2011 has taken decisionto establish Post Harvest management college at Taluka Roha Dist Raigad within the jurisdiction of Dr.BalasahebSawant Konkan Krishi Vidyapeeth.Accordingly it has been decided to provide Grant in Aid for the abovepurpose.

Agriculture, Animal Husbandry, Diary Development and Fisheries Department has created 52 posts (32-Non-Teaching & 20-Teaching) for proposed Post Harvest management college on the establishment of DrBalasaheb Sawant Konkan Krishi Vidyapeeth.Details of posts are given below.

Sr. Designation Pay Structure No. ofNo. Pay Band Grade Pay Post(1) (2) (3) (4) (5)

A) Teaching Staff :-

1 Associate Dean 37400-6700 10000 1

2 Professor 37400-6700 10000 53 Associate Professor 37400-6700 9000 7

4 Assistant Professor 15600-39100 6000 7

B) Non Teaching Staff :-

5 Assistant Librarian 15600-39100 6000 16 Issue Assistant (Library) 5200-20200 2000 17 Senior Research Assistant 9300-34800 4400 38 Laboratory Assistant 5200-20200 2000 39 Peon 4440-7440 1300 3

10 Instrument Mechanic 5200-20200 2800 111 Cold storage operator 5200-20200 2400 112 Assistant Security Officer 5200-20200 2800 113 Laboratory Boy 4440-7440 1300 114 Computer Operator 5200-20200 2400 115 Driver 5200-20200 1900 216 Assistant Engineer (Civil) 9300-34800 5400 117 Junior Engineer (Civil) 5200-20200 2800 118 Junior Engineer (Electrical) 5200-20200 2800 119 Mestri 5200-20200 1900 120 Tracer 5200-20200 2000 1

21 Plumber 5200-20200 2400 1

AGRICULTURE, ANIMAL HUSBANDRY, DAIRY DEVELOPMENTAND FISHERIES DEPARTMENT

P15

22 Assistant Registrar 9300-34800 4600 1

23 Assistant Comptroller 9300-34800 4600 1

24 Office Superintendent 9300-34800 4400 1

25 Senior Clerk 5200-20200 2400 1

26 Junior Clerk 5200-20200 1900 1

27 Stenographer (lower grade) 9300-34800 4300 1

28 Cashier 5200-20200 2400 1

29 Senior Store Keeper 5200-20200 2400 1

Total Post 52

Total recurrent and Non-recurrent expenditure for the year 2012-13 is expected to be Rs.1,30,00,000andRs.2,70,00,000 respectively.Therefore total provision of Rs.4,00,00,000 is proposed to be included in the BudgetEstimates 2012-13 by way of Section.I “New Item”

Accordingly, a provision of Rs.4,00,00,000 is, proposed to be included in the Budget Estimates, 2012-2013 by way of Section-I “New Item”.

——————

(1) (2) (3) (4) (5)

P16

P17

SCHOOL EDUCATION AND SPORTS DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—3

P18

P19

2202, GENERAL EDUCATION

02, Secondary Education

110, Assistance to Non-Government Secondary Schools

Schemes in the Five-Year Plan

(00)(07) Grants to Non-Government Junior Colleges (2202 0511)

36, Grant-in-Aid (Salary)

Item No. 4. Provision to cover the expenses of 2 Divisions of Higher Secondary Schools brought under100 % Grant-in-Aid.

Recurrent ... Rs.1000 Non-Recurrent .. .. Nil

Total ... Rs.1000 Ultimate Annual Recurrent .. .. Rs.12,00,000

Remarks.- The Government has decided to sanction two divisions of Higher Secondary Schools on100% grant-in-aid,for which 4 post of fulltime teachers in the pay scale of Rs. 9300-34800 + 4600 Gradepay,are required. Accordingly, the recurrent expenditure for the purpose is expected to be Rs.12,00,000.As the entire expenditure can be accommodated within the sanctioned grants of the financial year 2012-2013.

Accordingly, a token provision of Rs. 1000 is proposed to be made in the Budget Estimates 2012-2013 by way of Section - I “New Item”.

——————

SCHOOL EDUCATION AND SPORTS DEPARTMENT

H 4129—3la

P20

P21

PUBLIC WORKS DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

PUBLIC WORKS DEPARTMENT/ƺÉÉ´ÉÇVÉÊxÉEò ¤ÉÉÆvÉEòÉ¨É Ê´É¦ÉÉMÉ

3054, Roads and bridges

80, Ordinary

190, Public Sector and other activities assistance Rs.

(00)(03) B.O.T. works through privatisation -ViabilityGap Funding ( 3054 081 9)

3,00,00,000

Item no. - 5. Provision for construction of new road and bridge works

Recurrent --Rs. Nil Non Recurrent -- Rs. 3,00,00,000--

Total- -- Rs. 3,00,00,000-- Altimate Annual Recurrent- Nil

Remarks - It has been decided to make available funds for the construction of new road and bridge works

The details of works are shown as under : -

Serial No.

Location Name of the Work Estimated Cost

No & Date of AdministrativeApproval

Budget Estimates 2012-2013 +lÉǺÉÆEò±{É 2012-2013

Remarks

1 2 3 4 5 6 7

1 Maharashtra State

COMMON ITEMPayment of fee to Independant Engineer

100000 JÉÉIÉäºÉ-2012/ |É.Gò.26 (|É.¨É.1)/®úºiÉä-9 ÊnùxÉÉÆEò 02.03.2012

20000 Urgent Work

2 Maharashtra State

COMMON ITEMPayment arising out of Arbitration /Court matter

50000 JÉÉIÉäºÉ-2012/ |É.Gò.26 (|É.¨É.1)/®úºiÉä-9 ÊnùxÉÉÆEò 02.03.2012

10000 Urgent Work

Total -(00)(03) B.O.T. works through privatisation -Viability Gap Funding ( 3054 081 9)

30000

3054,Roads & BridgesSchemes in Five Year Plan

(Rs. in thousands)

Accordingly, a provision of Rs. 3,00,00,000 is, therefore, proposed to be included in the Budget Estimate 2012-2013 by the way of Section I"New -Item"

_______________________________________________________________________________________________________________________________________________________________________________

Rs.(03) (01) (4059 0672) Major Works 4,88,56,000(03) (02) (4059 0681) Establishment Charges 67,91,000(03) (03) (4059 0692) Tool and Plant Charges 5,37,000

State Share Total Rs. In Thousand 5,61,84,000

Recurrent - Nil Non-Recurrent - Rs.5,61,84,000/-

Total - Rs.5,61,84,000/- Ultimate Annual Recurrent - Nil

Item No. 6.

Sr. No. Name of Works Estimated Cost (Rupees in Thousand)

No. & Date of Administrative Approval

Provision for 2012-13 (Rupees

in Thousand)1 2 3 4 51 Increasing hight of the

surrounding compound wall & fitting security grills to High Court Bldg. at Mumbai.

6822 No. CCB-2011/983/C.R. 211/D-13, Dt. 09.02.2012.

1000

2 Construction of Civil and Session Court building (Ground+ first floor) at Patur, Dist. Akola.

37710 No.CCB-2011/544/ C.R.126/D-13, Date- 25.01.2012.

4000

3 Construction of witness room in the premises of Civil and Session Court building at Akole, Dist.Ahemednagar.

360 No.CCB-1009/842/ C.R.122/D-13, Date- 08.01.2010.

36

4 Construction of Court building at Kalmeshwar, Dist. Nagpur.

39159 No.CCB-2011/1165/ C.R.235/ D-13, Date- 24.02.2012.

4000

5 Construction of New Court building at the existing Court Bldg. at Kalamb, Dist. Usmanabad

17251 No.CCB-2609/1051/ C.R.226/ D-13, Date- 24.02.2012.

2000

6 Construction of Additional three Court Hall's ( two at first floor & one at second floor ) in the existing Court building at Kurla, Mumbai.

1233 No.CCB-2011/943/C.R.226/ D-13, Date- 24.02.2012.

120

7 Construction of Court building at Sonpeth, Dist. Parbhani.

38299 No.CCB-2010/949/C.R.295 /D-13, Date- 24.02.2012

3800

8 Construction of Court building at Dharngaon, Dist. Jalgaon.

35171 No.CCB-2011/944/C.R.228/ D-13, Date- 24.02.2012

3500

9 Construction of Court building at Phulambri, Dist. Aurangabad.

37406 No.CCB-2011/325/C.R.91/ D-13, Date- 24.02.2012

3700

10 Construction of Court building at Ambajogai, Dist. Beed.

37455 No.CCB-2010/781/C.R.252/ D-13, Date- 24.02.2012

3700

11 Construction of Court building for Civil & Session Judge at Medha, Dist. Satara.

37557 No.CCB-3109/840/C.R.112/D-13, Date 19.03.2012

4000

12 Construction of new Court Building at Dhule.

89805 No.CCB-1809/C.R.83/D-13, Date 19.03. 2012

9000

13 Construction of Court Building at Majalgaon, Dist. Beed.

58796 No.CCB-2011/666/C.R.161/D-13, Date 19.03.2012

6000

14 Construction of Court Building at Manmad, Dist. Nashik

39186 No.CCB-2010/C.R.264/D-13, Date 19.03.2012

4000

Construction of Court Building (New Item) Demand No. H-84059-Capital Outlay on Public Works01, Office Building, 051, Consturction 03- Administration of Justice (Plan)

Scheme in the Five Year PlanCentrally Sponsored Scheme

It has been decided to make available funds for construction of Court Buildings & related other works.

4

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13

(Rs.Thousand)1 2 3 4 51 Renotion of conference Hall by

replacement of eletricity equipment, Air canditin, Audio vision facility in Jal Bhushan Bungalow at Rajbhavan Mumbai

4032 BDG2012/C.R.61/BLD-3 Date- 29/2/2012

300

2 Renotion of Lounge in Jal Bhushan Bungalow at Raj bhavan Mumbai

1115 BDG2012/C.R.58/BLD-3 Date- 29/2/2012

300

3 Prepration new lawn by replacing old lawn backside of Jalbhushan Bungalow at Rajbhavan Mumbai

956 BDG2012/C.R.51/BLD-3 Date- 28/2/2012

300

4 Renotion of Lounge by providing laminated wooden flooring in Jalbhushan Bungalow at Rajbhavan Mumbai

2073 BDG2012/C.R.60/BLD-3 Date- 28/2/2012

300

5 Renotion of conferences Hall in Jalbhushan Bungalow at Rajbhavan Mumbai

2573 BDG2012/C.R.59/BLD-3 Date- 28/2/2012

300

6 External water supply arrangement for VVIP Building through ESR at Rajbhavan Mumbai

12040 BDG2012/C.R.45/BLD-3 Date- 28/2/2012

400

7 Construction of Isolation wall near Secretariat office at Rajbhavan Mumbai

2518 BDG2012/C.R.46/BLD-3 Date- 29/2/2012

300

8 Replacement of Lift at Jal Bhushan Bungalow at Rajbhavan Mumbai

3129 BDG2012/C.R.62/BLD-3 Date- 14/2/2012

1000

(4059 0645) 32,00(4059 0654) 4,45(4059 0663) 35

36,80

4059, CAPITAL OUTLAY ON PUBLIC WORKS01, Office Buildings051, Construction

(02) Governor (Charged) (Plan)(02) (01) 4059 0645 Major Works Rs. 32,00,000(02) (02) 4059 0654 Establishment Charges 4,45,000(02) (03) 4059 0663 Tools and Plant Charges 35,000

Total 36,80,000Item No. 7. It has been decided to make Provision for various works at Rajbhavan Mumbai.

Recurrent: Nil Non Recurrent : Rs.36,80,000/- Total Rs.36,80,000/- Ultimate Annual Recurrent : Nil

4059 Capital Outlay on public works , Governor (Plan)

5

Sales Tax (Plan)

Sales Tax (Plan) (Rs.In thousands)

(04) (01) 4059 0707 Major Works 43479(04) (02) 4059 0716 Establishment Charges 6043(04) (03) 4059 0725 Tools and Plants Charges 478

Total 50000

(Rs.In thousands)

Recurrent Non recurrent 50000

Total 50000 Ultimate Annual Recurrent Nil

S.No. Name oF Work Estimate Cost Administrative Approval no. and date

Budgeted Amount for the Year 2012-13 (Rs.in thousands)

1 Construction of Rest House in Sales Tax Office area At Nagpur

1,05,92G.R.Vikavi 1410/ C.R.247/ Vi.Pra-4,Dt.17.2.2012 9217

2 Construction of Sales Tax Office At Parbhani. 1,56,93 G.R.Vikavi 1410/ C.R.71/

Vi.Pra-4,Dt.17.2.2012 9652

3 Construction of New Sales Tax Office Building At Sangali 5,25,57

G.R.Vikavi 1408/C.R.252/ Vi.Pra-4,Dt.15/9/2011 24610

4059 capital,outlay on Public Works 01,Office Building053,Construction

Item No. 8. It has been decided to make provision for Sales tax office Buildings at Nagpur Parbhani and pune

6

(01)(01) Major Works (40590799) Rs. 8,48,59,000(01) (02) Establishment Charges (4059 0805) 1,17,95,000(01)(03) Tools and Plant Charges(4059 0814) 9,33,000

Recurrent - Nil Non-Recurrent Rs. 9,75,87,000/-Total - Rs. 9,57,87,000/-

Ultimate Annual RecurrentNil

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 20012-

13 ( Rs.Thousand)

1 2 3 4 5

01- Office Building

53- Major Works1 Construction of 10 Talathi

Office cum accommodation at Tahasil Ambegaon, Dist.Pune

11550 BLD-3411/C.R.206/E-8, dt. 31/12/2011

3465

2 Construction of 1 Circle Officer and 15 Talathi Office cum accommodation at Tahasil Daund, Dist.Pune

33402 BLD-3411/C.R.351/E-8, dt. 6/3/2012

10021

3 Construction of Tahasil and Sub-Divisional Office at Katol, Dist.Nagpur

33563 BLD-3911/C.R.62/E-8, dt. 31/12/2011

10069

4 Construction of New Tahasil Office at Ausa, Dist.Latur

41981 BLD-43 A 11/C.R.64/E-8, dt. 28/2/2012

12594

5 Construction of New Administrative Building at Sangamner, Dist.Ahmadnagar

64182 BLD-3311/C.R.297/E-8, dt. 9/2/2012

19255

6 Construction of Administrative Building for Panvel Tahasil Office, Dist. Raigad

98180 BLD-2812/C.R.57/E-8, dt. 6/3/2012

29455

Item No. 9. It has been decided to make provision for construction of various revenue buildings.

H-(8)-REVENUE AND FOREST DEPARTMENT (New Works01- Office Building051 - Constructions

(01) (01) Major Constructions

4059- Capital Outlay on Public Works

051-Constraction(07) District Administration-Plan(01)(01) Major Works (40590799)

7

Sr.No. Name of the work Estimated cost Administrative Approval G.R.no.& date

Provision for 2012-13 (Rs.Thousand)

1 2 3 4 51 Construction of office building

of Deputy Regional Transport Office, Pimpri-Chinchawad

81041 No.MVD 1211/C.R.453 /TRA 4, dated .2.1.2012

35218

Major Works 35218Esatablishment Charges 4895Tools & Plant Charges 387Total - 40500

Total Rs..4,05,00,000/- Ultimate Annual Recurrent : Nil Recurrent: Nil Non Recurrent : Rs.4,05,00,000/-

(08) (02) 4059 0832 Establishment Charges 48,95,000(08) (03) 4059 0841Tools and Plant Charges 3,87,000

4059, CAPITAL OUTLAY ON PUBLIC WORKS

(08) (01) 4059 0823 Major Works Rs. 3,52,18,000

Total 4,05,00,000Item No. 10. It has been decided to make provision for Construction of Deputy R.T.O. Building.

08, Transport53, Major Works

(08) (01) Major Works (Plan)

8

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13

(Rs.Thousand)1 2 3 4 5

1 Sub-Treasury Telhara,Dt.Akola office building Repairing

401 KOIBA1010/CR.71/ Tre-Adm-4, dt.31/3/2011

401

2 Construction of cycle stand at Treasury Amaravati

179 KOIBA1011/CR.51/ Tre-Adm-4, dt.10/6/2011

179

3 Construction of office building of subtreasury Aheri, Dt.Gadchiroli

5566 KOIBA1011/CR.61/ Tre-Adm-4, dt.30/7/2011

400

4 Construction of office building of Treasury Bhandara

20631 KOIBA2010/CR.45/ Tre-Adm-4, dt.5/11/2011

500

5 Construction of office building of Treasury Washim

14532 KOIBA2011/CR.42/ Tre-Adm-4, dt.15/11/2011

500

6 Construction of Strong room at Sub-treasury Shegaon, Dt.Buldhana

1442 KOIBA1011/CR.86/ Tre-Adm-4, dt.17/1/2012

400

7 Building Repairing & construction of compound wall at subtreasury Motala

2192 KOIBA1011/CR.87/ Tre-Adm-4, dt.17/1/2011

449

8 Construction of Strong room at Treasury-Gondia

471 No.MSS/2007/Ko.Gondiya/Suraksha Kaksh darvaja/upsa(Bha.pa)31/1739Dt.25/03/2008

471

9 Buldhana Treasury construction of compound wall of record room & Ladies toilet

2195 KOIBA1011/CR.102/ Tre-Adm-4, dt.31/1/2012

400

10 Sub-treasury Babhulgaon, Dt.Yavatmal- Construction of new office building

2565 KOIBA1011/CR.103/ Tre-Adm-4, dt.31/1/2012

400

11 Construction of new building at Hingoli Treasury

27008 KOIBA2010/CR.98/ Tre-Adm-4, dt.13/4/2011

6500

12 Sub-treasury Pen, Dt.Raigad- Construction of new building

2096 KOIBA1011/CR.69/ Tre-Adm-4, dt.30/7/2011

2096

13 Sub-treasury Indapur, Dt.Pune, strengthening of strong room.

185 KOIBA2010/CR.108/ Tre-Adm-4, dt.22/12/2011

185

14 Sub-treasury Radhanagari, Dt.Kolhapur Construction of Strong room

150 KOIBA2010/CR.110/ Tre-Adm-4, dt.28/12/2011

150

15 Sub-treasury Kavthe mahakal Dt.Sangli- Building repairing

1268 KOIBA1011/CR.80/ Tre-Adm-4, dt.18/1/2012

1268

16 Sub-treasury Mohol, Dt.Solapur Repairing of strong room

95 KOIBA1011/CR.87/ Tre-Adm-4, dt.17/1/2012

95

Majaor Work (4059 0852) 1,43,94 Establishment Charges (4059 0861) 20,00 Tools and Plant Charges (4059 0879) 1,58

Total 1,65,52

4059, CAPITAL OUTLAY ON PUBLIC WORKS01, Office Buildings051, Construction

(09) Treasury and Account Administration (Plan)(09) (01) 4059 0852 Major Works Rs. 1,43,94,000(09) (02) 4059 0861 Establishment Charges 20,00,000(09) (03) 4059 0879 Tools and Plant Charges 1,58,000

Total 1,65,52,000Item No.11. It has been decided to make Provision for Construction of Treasury Offices.

Recurrent: Nil Non Recurrent : Rs.1,65,52,000/- Total Rs.1,65,52,000/- Ultimate Annual Recurrent : Nil

4059 Capital Outlay on public works ,(09)Treasury (Plan)

9

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13

(Rs.Thousand)1 2 3 4 51 Renovation of MLA rooms at

new Amdar nivas Manora Mumbai

142800 BDG2011/C.R.85/BLD-3 Date- 29/2/2012

3000

2 Renovation of cerket house & construction of meeting hall at Karad Dist. Satara.

202234 BDG2011/C.R.471/BLD-3 Date- 13/3/2012

29600

Majaor Work (4059 0941) 32600 Establishment Charges (4059 0959) 4531 Tools and Plant Charges (4059 0968) 359

Total 37490

Sr. No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13

(Rs.Thousand)1 2 3 4 5

1 Construction of Admn. Bldg. at Kamgav , Dist.Buldhana.

42101 BDG2011/1003/C.R.300/BLD-3 Date- 27 /2/2012

10000

2 Construction of Building for public work sub Division office at Mehekar , Dist. Buldhana

4890 BDG2012/C.R.81/BLD-3 Date- 28 /2/2012

4890

3 Construction of Admn. Bldg. at Tivsa , Dist. Amravati

67637 BDG2012/C.R.80/BLD-3 Date- 29 /2/2012

10000

4 Construction of Admn. Bldg. at Devli , Dist. Vardha

56392 BDG2012/C.R.77/BLD-3 Date- 27 /2/2012

10000

5 Construction of Building for public work Division office and sub Division office at Hingoli

34364 BDG2012/C.R.48/BLD-3 Date-27 /2/2012

5000

6 Making Modular Seating Arrangement for the officers and staff of Public work Department at Mantralaya Building Mumbai

20133 BDG2011/C.R.321/BLD-3 Date-19 /9/2011

3000

4059, CAPITAL OUTLAY ON PUBLIC WORKS01, Office Buildings051, Construction

(12) Inspection Bunglow, Rest Houses (Plan)(12) (01) 4059 0941 Major Works Rs. 3 ,26,00,000(12) (02) 4059 0959 Establishment Charges 45,31,000(12) (03) 4059 0968 Tools and Plant Charges 3,59,,000

Total 3,74,90,000Item No.12. It has been decided to make Provision for Construction of Inspection Bunglow,

Rest Houses. Recurrent: Nil Non Recurrent : Rs.3,74,90,000/- Total Rs.3,74,90,000/- Ultimate Annual Recurrent : Nil

4059 Capital Outlay on public works , Inspection Bunglow,rest houses

4059, CAPITAL OUTLAY ON PUBLIC WORKS01, Office Buildings051, Construction

13 , Office Building(Plan)(13) (01) 4059 0977 Major Works Rs. 8,33,90,000(13) (02) 4059 0986 Establishment Charges 1,15,91,000(13) (03) 4059 0995 Tools and Plant Charges 9,17,000

Total 9,58,98,000Item No.13. It has been decided to make Provision for Construction of Administrative buildings. Recurrent: Nil Non Recurrent : Rs.9,58,98,000/- Total Rs.9,58,98,000/- Ultimate Annual Recurrent : Nil

4059 Capital Outlay on public works , (01) Office Building

10

7 Providing Sandwith type Horizontal & Vertical Busduct & Rising mains system & Electrical Switch gears at Electrical Services in main & Annexe Building at Mantralaya & Taking Services from BEST.

264339 BDG2011/C.R.360/BLD-3 Date-29 /2/2012

6000

8 Renovation of Toilet Blocks from Ground Floor to 7 th fioor of Mantralaya Main & Annex Building Mumbai.

76290 BDG2010/1107/C.R.457/BLD-3 Date-24 /2/2012

7000

9 Renovation of modular seating Arrangement for officers & Staff with was newely shifted to Bandkam Bhavan Marjban Road Mumbai & also provide Storge facility , landsacping of Histrorical Building etc.

50000 BDG2012/C.R.88/BLD-3 Date- 29/2/2012

2000

10 Strengthening & Structural repairs to New Administrative building at Mumbai.

152200 BDG2012/C.R.82/BLD-3 Date- 29/2/2012

3500

11 Construction of Admn. Bldg. at Saswad , Dist.Pune.

75418 BDG2011/850/C.R.296/BLD-3 Date-26 /8/2011

3500

12 Construction of Admn. Bldg. at Daund , Dist. Pune.

81928 BDG2011/314/C.R.293/BLD-3 Date- 26/8/2011

3500

13 Construction of Admn. Bldg. at Sirala , Dist.Sangli.

85089 BDG2012/C.R.72/BLD-3 Date-29 /2/2012

4000

14 Construction of Admn. Bldg. at Ajra , Dist.Kholapur.

59394 BDG2011/279/C.R.231/BLD-3 Date-27 /2/2012

3000

15 Construction of Admn. Bldg. at Devla , Dist.Nashik.

75371 BDG2012/C.R.74/BLD-3 Date-29 /2/2012

4000

16 Construction of Admn. Bldg. At Siner , Dist.Nashik.

55000 BDG2012/C.R.53 /BLD-3 Date-29 /2/2012

4000

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13 (Rs. In Thousand`)

1 2 3 4 51 Construction of computer

Engineering Buildings at Govt. Polytechnic Osmanabad

28487 No.AA/2009(80/09)/TE-3 ,Date 12.08.2009

17000

2 Construction of Girls Hostel Buildings for intake capacity 96 at Govt. Polytechnic Osmanabad

42277 No.PSM/2009(90/09)/TE-3 ,Date 12.08.2009

17000

3 Construcution of Adminstrative Building at P.L.G. Polytechnic, Latur

269685 No.PSM-2011/(71/11)/TE-3, Dtd-29/2/2012

26350

4 Construcution of Boys Hostel Building for intake capacity 180 at P.L.G. Polytechnic, Latur

63286 No.PSM-2012/(19/12)/TE-3, Dtd-29/2/2012

10370

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION State Plan Schemes -Buildings 104,Polytechnics - Major Works

Rs.Thousand(00) (01) 4202 0678 Major Works 110894(00) (02) 4202 0687 Establishment Charges 18134(00) (03) 4202 0696 Tools and Plant Charges 1435

Total 130463

Item No. 14. It has been decided to make Provision for Construction of Buildings for Government Poytechnics.

Recurrent: Nil Non Recurrent : Rs.13,04,63,000/- Total Rs.13,04,63,000/- Altimate Annual Recurrent : Nil

11

5 Construction of Extention of main Building at Govt. Ploytechnic, Ratnagiri

30077 No.PSM/2009(129/09)/TE-3 ,Date 28.10.2009

12750

6 Extention of main Workshop Building at Govt. Polytechnic, Miraj

12431 No.PSM/2010(38/10)/TE-3 ,Date 13.4.2010

5270

7 Construction of Extention of 1st Fioor on main Building at Govt. Ploytechnic, Gadchiroli

36310 No.PSM/2009(97/09)/TE-3 ,Date 27.08.2009

14323

8 Construction of New Administrative and Education Building (A) at Govt. Polytechnic, Aurangabad

14037 No.PSM/2009(88/09)/TE-3 ,Date 12.08.2009

4250

9 Renovation of Gymkhana Hall at Govt. Polytechnic, Aurangabad

1191 No.PSM/2011/(11/2011)/TE-3, Dtd, 23/3/2011

1012

10 Contruction work at girls Hostel,Govt.Polytechnic, Nagpur regarding Provision of Facility for physically handicap candidates

556 9(1)/DTE/GPN/2012/34 dt. 4.2.2012

473

11 Contruction work at the Office of the joint Director in the campus of ,Govt.Polytechnic, Nagpur regarding Provision of Facility for phisycali handicap candidates

521 9(1)/DTE/GPN/2012/41 dt. 2.2.2012

443

12 Contruction work at main Building of Govt. Polytechnic, Nagpur regarding Provision of Facility for physically handicap candidates

883 9(1)/DTE/GPN/2012/35 dt. 2.2.2012

751

13 Contruction work at boys Hostel,Govt.Polytechnic, nagpur regarding Provision of Facility for phisycali handicap candidates

513 9(1)/DTE/GPN/2012/37 dt. 2.2.2012

436

14 Contruction work at Annex Building of Govt. Polytechnic, Nagpur regarding Provision of Facility for phisycali handicap candidates

548 9(1)/DTE/GPN/2012/36 dt. 2.2.2012

466

110894 Majaor Work (4202 0678) 110894 Establishment Charges (4202 0687) 18134Tools and Plant Charges (4202 0696) 1,435

130463

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION

Scheme in the Five Year Plan , State Plan Schemes Schemes for Removal of Regional Imbalance - Buildings

Rs.Thousand(00) (04) 42025992 Major Works 48450(00) (05) 42026003 Establishment Charges 7923(00) (06) 42026012 Tools and Plant Charges 627

Total 57000

Item No. 15. It has been decided to make Provision for Construction of Girls Hostels in Government

Polytechnics

Recurrent: Nil Non Recurrent : Rs.5,70,00,000/- Total Rs.5,70,00,000/- Ultimate Annual Recurrent : Nil 12

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13 (Rs.In Thousand)

1 2 3 4 51 Contruction of 2nd Floor on

Existing Girls Hostel Building at Govt. Polytechnic, Ahmadnagar

15581 No.PSM/2009(114/9)/TE-3 , Date 20.08.2009

4675

2 Contruction of girls hostel Capacity 180 at Govt. Polytechnic Ratnagiri

52981 No.PSM/2009(130/9)/TE-3 , Date 15.02.2009

8500

3 Contruction of girls hostel intake Capacity 54 at Govt. Polytechnic Solapur

10906 No.PSM/2011(45/11)/TE-3 , Date 30.05.2011

935

4 Contruction of girls hostel intake Capacity 28 at Govt. Polytechnic,Jalgaon

9442 No.PSM/2010(21/2010)/TE-3 , Date 23.04.2010

1700

5 Contruction of girls hostel intake Capacity 54 at Govt. Polytechnic,Beed

10000 No.PSM/2011(98/119)/TE-3 , Date 03.11.2011

850

6 Contruction of Extention of 1st Floor on girls hostel at Govt. Polytechnic,jalna

19719 No.PSM/2010(48/10)/TE-3 , Date 21.05.2011

8245

7 Construction of Extention of 1st Fioor on Existing Girls Hostel Building at Govt. Ploytechnic, Pune

10000 No.PSM/2010(171/10)/TE-3 , Date 29.11.2010

850

8 Contruction of girls hostel Phase -2 at Govt. Polytechnic,Arvi

19623 No.PSM/2010(15/2010)/ TE-3 , Date 27.04.2010

4250

9 Contruction of 1st floor on girls hostel Building intake Capacity 48 at Govt. Polytechnic,Gadchiroli

18333 No.PSM/2009(95/09)/ TE-3 , Date 27.08.2009

7055

10 Contruction of girls hostel intake Capacity 48 at Govt. Polytechnic,Amaravati

12170 No.PSM/2011(78/11)/ TE-3 , Date 09.08.2011

1785

11 Contruction of girls hostel intake Capacity 50 at Govt. Polytechnic,Yavatmal

10575 No.PSM/2010(87/10)/TE-3 , Date 27.04.2010

1020

12 Contruction of girls hostel intake Capacity 34 at Govt. Polytechnic,Aurangabad

11276 No.PSM/2011(06/11)/TE-3 , Date 22.03.2011

1020

13 Contruction of girls hostel intake Capacity 68 at Govt.Residential Womans Polytechnic,Latur

26162 No.PSM/2011(90/11)/TE-3 , Date 1.10.2011

4250

14 Contruction of girls hostel intake Capacity 56 at Govt. Polytechnic,Ambad

13963 No.PSM/2011(88/11)/TE-3 , Date 29.12.2011

3315

48450 Majaor Work (4202 5992) 48450 Establishment Charges (4202 6003) 7923Tools and Plant Charges (4202 6012) 627Total 57000

(00) (08) 4202 6032 Establishment Charges 1865/-(00) (09) 4202 6041 Tools and Plant Charges 148/-

Total 13419/-

(00) (07) 4202 6021 Major Works 11406/-

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION

State Plan Schemes - Buildings104, Polytechnics

Establishment of New Govt. Polytechnics Rs.Thousand

Item No. 16. It has been decided to make Provision for various works in New Government Polytechnics

Recurrent: Nil Non Recurrent : Rs.1,34,19,000/- Total Rs.Rs.1,34,19,000/- Ultimate Annual Recurrent : Nil

13

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13 (Rs.In Thousand)

1 2 3 4 51 Construction of Multipurpose

Hall and Rest House Building at Govt. Poly. Avsari.

72313 No.PSM/2010(85/10)/TE-3 , Date 17.03.2011

11406

Majaor Work (4202 6021) 11406 Establishment Charges (4202 6032) 1865Tools and Plant Charges (4202 6041) 148

Total 13419

Rs.Thousand

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13(Rs.InThousand)

1 2 3 4 51 Construction of boys hostel

building capacity 180 at Govt. Pharmacy College Karad.

26436 No.GEC/2008/(409/08)/TE-1 , Date 30.09.2008

12,750

2 Renovation of Mulripurpose Hall at Govt. College of Engineering Aurangabad

18874 GEC-2009/36/09/TE-1 Dt.12.03.2009

12,776

3 Construction of Water tank at Goct. College of Engg. Amravati

5016 No.PSM/2011(144/11)/TE-3 , Date 14.02.2012

4,250

4 Construction of boys hostel building capacity 180 at Govt. College of Engineering Amravati.

42997 No.GEC/2009(74/09)/TE-1 , Date 02.05.2009

8,500

38,276Majaor Work (4202 0702) 38276Establishment Charges (4202 0711) 6259Tools and Plant Charges (4202 0722 ) 495

Total 45030

Rs.Thousand

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION

Scheme in the Five Year Plan , Buildings 105, Engineering /Technical Colleges and Institutions

(00) (01) 4202 0702 Major Works 38276(00) (02) 4202 0711 Establishment Charges 6259(00) (03) 4202 0722 Tools and Plant Charges 495

Total 45030

Item No. 17. It has been decided to make Provision for Construction of Various Buildings in Govt. Engineering

and Pharmacy College .

Recurrent: Nil Non Recurrent : Rs.4,50,30,000/- Total Rs.4,50,30,000/- Ultimate Annual Recurrent : Nil

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION

Scheme in the Five Year Plan , Buildings 105, Engineering /Technical Colleges and Institutions

(00) (04) 4202 6059 Major Works 8500(00) (05) 4202 6066 Establishment Charges 1390

Total Rs.1,00,00,000/- Ultimate Annual Recurrent : Nil

(00) (06) 4202 6077 Tools and Plant Charges 110Total 10000

Item No. 18. It has been decided to make Provision for Construction of Girls Hostels in Govt. Engineering andPharmacy Colleges.

Recurrent: Nil Non Recurrent : Rs.1,00,00,000/-

14

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13 (Rs. In Thousand`)

1 2 3 4 51 Construction of Girls hostel

building capacity 54 at Govt. College of Pharmacy Aurangabad

14797 No.PSM/2009(116/09)/TE-3 , Date 12.08.2009

8500

Total 8500

Majaor Work (4202 6059) 8500Establishment Charges (4202 6066) 1390Tools and Plant Charges (4202 6077) 110

Total 10000

4202, CAPITAL OUTLAY ON EDUCATION,SPORTS,ARTS AND CULTURE02,TECHNICAL EDUCATION

Scheme in the Five Year Plan , State Plan Schemes

Rs.Thousand(00) (01) 4202 0328 Major Works 55582

Schemes for Removal of Regional Imbalance - Buildings

(00) (02) 4202 0337 Establishment Charges 7727(00) (03) 4202 0346 Tools and Plant Charges 611

Total 63920

Item No. 19. Provision for Construction of Various Works in Govt. Polytechnics Under Backlog

Recurrent: Nil Non Recurrent : Rs.6,39,20,000/- Total Rs.6,39,20,000/- Ultimate Annual Recurrent : Nil

15

S.No. Name of Work Estimate Cost (Rs. In Thousand`)

Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13 (Rs.In Thousand)

1 2 3 4 51 Contruction of Separate

Building for Ciivil Engineering / Appiled Machanic / Science Department at at Govt. Polytechnic, Dhule

24398 No.PSM/2009(92/09)/TE-3 , Date 06.02.2009

11050

2 Construction of Extention Building at Govt. Polytechnic Jalna

25388 No.PSM/2009(1/09)/TE-3 , Date 30.05.2009

9913

3 Construction of Boys Hostel Building capacity 176 at Govt Polytechnic, Nanded

45248 No.PSM/2010(14/10)/TE-3 , Date 23.04.2010

10625

4 Construction of Workshop Extention Building at Govt. Polytechnic,Nanded

6070 PSM-2010-(17/2010)TE-3, Dt.20/03/2010

5100

5 Construction of main Road with Drainage line at Govt. Plytechnic Nanded

6282 No.PSM/2012(48/12)/TE-3 , Date 13.03.2012

5400

6 Construction of Residential Quarters for Principal, H.O.D.,Lecturer and Staff at Govt Polytechnic Gondia

36418 No.PSM/2012(23/12)/TE-3 , Date 06.03.2012

8500

7 Construction of Compound wall to Boys Hostel Building and CC Road (part 1&2) at Govt. Polytechnic Beed

2900 9(1)/Construction/GPBeed/2011-12/578 dt. 18.10.2011

2465

8 Construction of Cycle Stand , plin Protection and CC Drainage at Govt Polytechnic Beed

485 9/DTE/Planing/2011/254 dt. 04.03.2011

412

9 Construction of Electrical and Communication lab at Govt. Politechnic Beed

494 9/DTE/Planing/2011/255 dt. 04.03.2011

420

10Construction of Repairing Work of main Building 1st Floor at Govt Polytechinc Beed

496 9/DTE/Planing/2011/256 dt. 04.03.2011

422

11Construction of Machanical and Serving lab at main Building at Govt.Polytechinc Beed

500 9/DTE/Planing/2011/314 dt. 08.03.2011

425

12 Construction of Repairing work of Boys Hostel Building at Govt. Polytechnic Beed

500 9/DTE/Planing/2011/316 dt. 04.03.2011

425

13 Construction of Press to Autocad in main Building at Govt. Polytechnic Beed

500 9/DTE/Planing/2011/317 dt. 08.03.2011

425

55582

Majaor Work (4202 0328) 55582Establishment Charges (4202 0337 ) 7727Tools and Plant Charges (4202 0346) 611

Total 63920

H-(8)-PUBLIC WORKS DEPARTMENT (New Works)Major Head, Minor Head, Sub-Head, Detailed

4210- Capital Outlay on Medical & Public Health01- Urban Health Services (Medical Relief)

110- Hospital & Dispensaries(01) Schemes in the Five Year Plan- Buildings

(01)(01) Major Works (4210 0014)53- Major Works

Recurrent - Nil Non-Recurrent Rs. 22,63,04,000/-Total - Rs. 22,63,04,000/- Ultimate Annual Recurrent - NilItem No. 20. It has been decided to make available funds for Sub-District Hospitals, Trauma care units etc.. Details are given below

Proposals of construction of various Health Institutes of Public Health Department.

16

Sr.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 20011-12

(Rs. In thousand)

1 Construction of Main building of Trauma Care Unit at Sub District Hospital, Gokunda, Dist. Nanded.

15543 TCU 2011/CR 225/HEALTH 4, dt. 21.1.2012

5000

2 Construction of Main building of Trauma Care Unit at Rural Hospital, Naigaon, Dist. Nanded.

15834 TCU 2011/CR 224/HEALTH 4, dt. 4.2.2012

5000

3 Construction of Residential Building and Dharmshala Building in the compound of Late Sau. Venutai Chavan Sub District Hospital, Dist. Karad

79020 PRAMA 2011/CR 231/HEALTH 4, dt. 10.2.2012

20000

4 Construction of Main building of Additional 100 beded Civil Hospital, Hingoli.

107170 SARUHI 2011/CR 192/HEALTH 4, dt. 10.2.2012

17500

5 Construction of Residential Building at Sub District Hospital, Indapur, Dist. Pune.

60473 URUP 2011/CR 436/HEALTH 3A, dt. 6.2.2012

7500

6 Construction of Residential Building at Sub District Hospital, Deglur, Dist. Nanded

26222 TCU 2012/CR 3/HEALTH 4, dt. 3.3.2012

5000

7 Construction of Truma Care unit Main Building at Sub District Hospital, Deglur, Dist. Nanded

17044 TCU 2012/CR 2/HEALTH 4, dt. 3.3.2012

5000

8 Repairing works of Women Hospital, Latur.

1998 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 22559-82/ 11, dt. 21.9.2011

1500

9 Internal construction works of Civil Hospital, Wardha

133703 PRSHAMA 2012/CR 98/HEALTH 3, dt. 19.3.2012

20000

10 Construction of Extention building of Service Hospital at Kasbabawada, Dist. Kolhapur.

39046 SERUBA 2012/CR 6/HEALTH 4, dt. 3.3.2012

10000

11 Installation of Air condition in Operation theater in District Hospital, Aundh, Dist. Pune.

12757 JIRUP 2012/CR 60/HEALTH 3A, dt. 13.3.2012

12000

12 Repairing works of Dr.Bandorwala Lapresy Hospital, Pune.

5676 MIS 2011/CR 345/HEALTH 3A, dt. 6.2.2012

5000

13 Various Construction works of District Hospital, Osmanabad

2531 JIRUU 2011/CR 202/HEALTH 4, dt. 3.3.2012

2400

14 Installation of New lift for District Hospital, Satara

2386 UJIBA 2012/CR 3/HEALTH 4, dt. 3.3.2012

2386

15 Renewation of Administrative Building & Hostel of Health & Family Welfare Center, Aurangabad & other internal works

5132 PRAKEBA 2012/CR 61/HEALTH 4, dt. 3.3.2012

2500

16 Renewation of Sub District Hospital, Karad, Dist. Satara

7300 UJIBA 2012/CR 64/HEALTH 3A, dt. 3.3.2012

5000

17 Construction of Nursing Training Center & Hostel building at 200 beded Civil Hospital Malegaon, Dist.Nashik approved under the Nashik Development Programme, 2009.

77746 NAVIKA 1810/CR 109/HEALTH 3, dt. 18.1.2012

10000

17

18 Construction of Geratric & Mental Health Center at Ambajogai, Dist. Beed.

100000 BANDHKAM 2012/CR 63/HEALTH 4, dt. 15.3.2012

11000

19 Additional Construction for Sub District Hospital, Manchar, Dist. Pune.

20000 PRASHAMA 2012/CR /HEALTH 3A, dt. 16.3.2012.

5000

20 Construction of Sub District Hospital, Kalamnuri, Dist. Hingoli.

410019 GRARUBA 2012/CR 41/HEALTH 4, dt. 15.3.2012.

45000

Total 1139600 196786196786273532165

226304

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 20011-12

(Rs. In thousand)

1 Construction of Main building of Sub District Hospital, Mangaon, Dist. Raigad.

23647 URURA 2011/CR 354/HEALTH 3A, dt. 22.11.2011

9500

2 Construction of Residential Quarters of Rural Hospital, Kandhar, Dist. Nanded.

8735 GRARUBA 2012/CR 5/HEALTH 4, dt. 3.3.2012

5000

3 Repairing works of Rural Hospital, Pachod, Dist. Aurangabad.

2474 GRAMIRU 2011/CR 168/HEALTH 4, dt. 1.3.2012

500

4 Repairing works (Part-1) of Rural Hospital, Chinchwan, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30195-97/ 11, dt. 25.12.2011

800

5 Repairing works (Part-2) of Rural Hospital, Chinchwan, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30199-202/ 11, dt. 29.12.2011

800

6 Internal Repairing works of Rural Hospital, Chinchwan, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30190-94/ 11, dt. 29.12.2011

800

7 Repairing works of residential quarters of Rural Hospital, Chinchwan, Dist. Beed.

400 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30203-06/ 11, dt. 29.12.2011

300

8 Repairing works of residentail quarters of Rural Hospital, Talkhed, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30215-18/ 11, dt. 29.12.2011

800

9 Repairing works of Rural Hospital, Talkhed, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30207-10/ 11, dt. 29.12.2011

800

Total

H-(8)-PUBLIC WORKS DEPARTMENT (New Works)Major Head, Minor Head, Sub-Head, Detailed

Establishment Charges (13.90%)Tools and Plant Charges (1.10%)

4210- Capital Outlay on Medical & Public Health

04- Public Health104- Community Health Centers(00)(01) Major Works (4210 0391)

53- Major WorksRecurrent - Nil Non-Recurrent Rs. 10,30,40,000/-Total - Rs. 10,30,40,000/- Ultimate Annual Recurrent - NilItem No. 21. It has been decided to make available funds for Rural Hospitals. Details are given below

Proposals of Constructions of Rural Hospitals in Non R.I. Area

Majaor Work

18

10 Construction of internal roads of Rural Hospital, Talkhed, Dist. Beed.

1000 Dy. Director, Health Services, Latur Circle's Order No. USANAASE/ NIYOJAN/ 30211-14/ 11, dt. 29.12.2011

800

11 Repairing works of Rural Hospital, Khultabad, Dist. Aurangabad.

4458 GRAMIRU 2011/CR 201/HEALTH 4, dt. 23.2.2012

4000

12 Internal construction works of Rural Hospital, Karanja, Dist. Wardha

37772 PRSHAMA 2012/CR 108/HEALTH 3, dt. 17.3.2012

7500

13 Construction of Residential Quarters of Rural Hospital, Devli, Dist. Wardha.

38167 PRSHAMA 2012/CR 109/HEALTH 3, dt. 17.3.2012

5000

14 Construction of Compound wall of Rural Hospital at Chinchni wangi, Dist. Sangli

2330 GRARUBA 2012/CR 7/HEALTH 4, dt. 3.3.2012

2000

15 Construction of O.P.D. of Rural Hospital, Pulgaon, Dist. Wardha.

11758 PRSHAMA 2012/CR 107/HEALTH 3, dt. 17.3.2012

5000

16 Repairing & Renewation of Main building of Rural Hospital, Wambori, Tal. Rahuri, Dist. Ahmednagar.

10774 PRASHAMA 2012/CR 156/HEALTH 3, dt. 14.3.2012

8000

17 Repairing & Renewation of Main building of Rural Hospital, Satana, Tal.Satana, Dist.Nashik.

10295 PRASHAMA 2012/CR 161/HEALTH 3, dt. 14.3.2012

8000

18 Repairing & Renewation of Main building of Rural Hospital, Pathardi, Dist.Ahmednagar.

8621 PRASHAMA 2012/CR 154/HEALTH 3, dt. 14.3.2012

7500

19 Repairing & Renewation of Main building of Rural Hospital, Shevgaon, Dist.Ahmednagar.

9914 PRASHAMA 2012/CR 155/HEALTH 3, dt. 14.3.2012

8000

20 Repairing & Renewation of Main building of Rural Hospital, Dabhadi, Tal.Malegaon, Dist.Nashik.

9984 PRASHAMA 2012/CR 158/HEALTH 3, dt. 14.3.2012

8000

21 Repairing & Renewation of Main building of Rural Hospital, Zodga, Tal.Malegaon, Dist.Nashik.

7334 PRASHAMA 2012/CR 159/HEALTH 3, dt. 14.3.2012

6500

Total 192663 896008960012454

986103040

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 20011-12

(Rs. In thousand)

1 Construction of Residential Building at Rural Hospital, Junnar, Dist. Pune.

24356 GRARUP 2011/CR 435/HEALTH 3A, dt. 15.2.2012

10000

Major Head, Minor Head, Sub-Head, Detailed

Majaor Work Establishment Charges (13.90%)

Item No. 22. It has been decided to make available funds for Rural Hospitals. Details are given belowProposals of Constructions of Rural Hospitals in R.I. Area

53- Major WorksRecurrent - Nil Non-Recurrent Rs. 15,81,25,000/-Total - Rs. 15,81,25,000/- Ultimate Annual Recurrent - Nil

4210- Capital Outlay on Medical & Public Health04- Public Health

200- Other Programme, Five Year Plan(00)(01) Major Works (4210 0141)

Tools and Plant Charges (1.10%)Total

H-(9)-PUBLIC WORKS DEPARTMENT (New Works)

19

2 Construction of Residential Building at Rural Hospital, Deaiganj wadsa, Dist. Gadchiroli.

15412 PRSHAMA 2012/CR 42/HEALTH 3, dt.15.2.2012

7500

3 Construction of Residential Building at Rural Hospital, Selu, Dist. Wardha.

34915 PRSHAMA 2011/CR 403/HEALTH 3, dt. 2.12.2011

12500

4 Construction of Main Building at Rural Hospital, Palandur, Tal. Lakhni, Dist. Bhandara.

15488 GRARUP 2011/CR 349/HEALTH 3, dt. 2.12.2011

7500

5 Construction & Internal works at Rural Hospital, Srirampur (Shirasgaon), Tal.Srirampur, Dist. Ahmednagar.

6486 GRARUP 2012/CR 91/ HEALTH 3A 14/03/2012

2500

6 Construction of Residential quarters at Rural Hospital, Chakan, Dist. Pune.

36235 GRARUP 2012/CR 92/ HEALTH 3A, dt. 17.3.2012

12500

7 Construction of Rural Hospital Nhavare, Dist. Pune

14195 GRARUPU 2012/CR 70/ HEALTH 3A, dt. 14.3.2012

7500

8 Construction of Rural Hospital Shikrapur, Dist. Pune

40122 GRARUPU 2012/CR 83/ HEALTH 3A, dt. 13.3.2012

20000

9 Construction of Rural Hospital Aalandi, Dist. Pune

39659 GRARUPU 2012/CR 84/ HEALTH 3A, dt. 14.3.2012

15000

10 Construction of Residential building at Rural Hospital Aalandi, Dist. Pune

29932 GRARUPU 2012/CR 84/ HEALTH 3A, dt. 14.3.2012

10000

11 Construction of building at Rural Hospital Jejuri, Dist. Pune

47017 GRARUPU 2012/CR 71/ HEALTH 3A 17/03/2012

15000

12 Construction of Residential quarters at Rural Hospital, Purna, Dist. Parbhani.

24963 GRARUBA 2012/CR 47/HEALTH 4, dt. 3.3.2012

3000

13 Construction of Main Building of Rural Hospital, Bodhegaon, Dist. Ahmednagar

10444 PRASHAMA 2012/CR 142/HEALTH 3, dt. 9.3.2012

2500

14 Construction of Main building & Residential quarters at Rural Hospital, Rajur, Dist. Jalna.

51296 GRARUBA 2012/CR 37/HEALTH 4, dt. 3.3.2012

6000

15 Repairing & Renewation of Main building of Rural Hospital, Nampur, Tal. Satana, Dist. Nashik.

7725 PRASHAMA 2012/CR 160/HEALTH 3, dt. 14.3.2012

6000

Total 398245 137500137500191131513

158125Total

Majaor Work Establishment Charges (13.90%)Tools and Plant Charges (1.10%)

20

Demand No. H-7

S.No. Name of Work Estimate Cost Adminishtrative Approval No, Date

Budgeted Amount for the Year 2012-13

(Rs.Thousand)1 2 3 4 51 Structural repairs of D wing of

Sagar Building Mumbai25974 BDG2011/C.R.87/BLD-3

Date-16/3/20112000

2 Redevelepment of servant Quarters around government Varsha Bunglow & also Renovation of garden, ground, kitchan , internal roods, gate etc.

44318 BDG2011/C.R.85/BLD-3 Date-16/3/2011

3000

3

Renovation of Hon. C. M. Govt Bunglow & also Varsha & Torna Bunglows bt extantion & internal changes.

38442 BDG2011/C.R.86/BLD-3 Date-16/3/2011

5000

4

Strantning & Renovation for security purpose at Torna serounded area Malbarhill.

250000 BDG2012/C.R.104/BLD-3 Date-13/3/2011

57500

Majaor Work (4216 0262) 6,75,00 Establishment Charges (4216 0271) 93,83 Tools and Plant Charges (4216 0282) 7,42

Total 7,76,25

(00) (01) 4216 0262 Major Works Rs. 6,75,00,000(00) (02) 4216 0271 Establishment Charges 93,83,000(00) (03) 4216 0282 Tools and Plant Charges 7,42,000

Total 7,76,25,000Item No. 23. It has been decided to make Provision for Government Residential

Buildings. Recurrent: Nil Non Recurrent : Rs.7,76,25,000/-

106, General Pool Accommodation

4216, CAPITAL OUTLAY ON HOUSING01, Government Residential Buildings (Scheme in the Five-Year Plan)

Total Rs.7,76,25,000/- Ultimate Annual Recurrent : Nil 4216 Capital Outlay on Housing, Government Residential Buildings, General Pool Accommodation

1

Rs.(01) (01) (4216 0291) Major Works 4,33,00,000(01) (02) (4216 0306) Establishment Charges 60,19,000(01) (03) (4216 0315) Tool and Plant Charges 4,76,000

State Share 4,97,95,000

(03) (04) (4216 0522) Major Works 6,27,00,000(03) (05) (4216 0531) Establishment Charges 87,15,,000(03) (06) (4216 0549) Tool and Plant Charges 6,90,000

Central Share 7,21,05,000

Central + State Share 12,19,00,000

Recurrent - Nil Non-Recurrent - Rs.12,19,00,000/-Total - Rs.12,19,00,000/- Ultimate Annual Recurrent -

Nil

Sr. No. Name of Works Estimated Cost (Rs.

Thousand)

No. & Date of Administrative Approval

Provision for 2012-13

(Rs.Thousand)1 2 3 4 51 Construction of Residential

Quarters for Civil Judge (J.D.) at Savali, Dist. Chandrapur

2247 No. CRQ-2010/790/ C.R.261/ D-13, Date-5.10.2011

2200

2 Construction of Residential Quarters for Civil Judge (S.D.) at Dist. Satara.

3195 No.CRQ-3109/871/ C.R.143/D-13, Date-10.02.2011

3100

3 Construction of Residential Quarters for Judicial Officers at Badnapur, Dist. Jalna.

2264 No.CRQ-3603/ 1321/C.R.106/D-13,Date-5.01.2008

2200

4 Construction of Residential Quarters for Civil Judge (J.D.) at Babhulgaon, Dist. Yavatmal.

1768 No.CRQ-2010/ C.R.221/D-13, Date-5.10.2011

1700

5 Construction of Residential Quarters for Civil Judge (J.D.) at Ambad, Dist. Jalna.

1876 No.CRQ-2010/C.R.158/D-13, Date-5.10.2011

1800

6 Construction of Residential Quarters for Civil Judge (J.D.)and J.M.F.C. at Junnar, Dist. Pune.

1971 No.CRQ-2011/111/ C.R.64/D-13,Date-16.09.2011

1900

7 Construction of Residential Quarters for Civil Judge (J.D.) at Amlaner, Dist. Jalgaon

1251 No.CRQ-1210/C.R.164/D-13,Date-16.09.2011

1200

8 Construction of two Residential Quarters for Civil Judge (J.D.) at Vashi, Dist. Osmanabad.

4194 No.CRQ-2609/C.R.76/D-13,Date-16.09.2011

4100

9 Construction of One Residential Quarter for Civil Judge (J.D.) at Medha, Taluk Jawali, Dist. Satara.

1549 No.CRQ-3108/1546/ C.R.164/D-13, Date-11.08.2011

1500

Scheme in the Five Year PlanCentrally Sponsored Scheme

01, Government Residencial Building, 700, Other Housing01- Administration of Justice (Plan)

Construction of Residential Quarters (New Item) Demand No. H-74216-Capital Outlay on Housing

Item No. 24. It has been decided to make available funds for construction of Judicial officers / Staffs Quarter Buildings.

2

10 Construction of Residential Quarters for Civil Judge (J.D.) at Chandwad, Dist. Nashik.

1808 No.CRQ-2509/1030/ C.R.221/D-13, Date-25.07.2011

1800

11 Construction of two Residential Quarters for Civil Judge (S.D.) and two Residential Quarters for Joint Civil Judge (S.D.) at Dist. Nanded.

13864 No.CRQ-2409/1054/ C.R.(6/10)/D-13, Date- 7.07.2010

13800

12 Construction of two Residential Quarters for Civil Judge at Pavani, Dist. Bhandara.

3716 No.CRQ-2010/C.R. 155/D-13, Date- 29.11.2011

3700

13 Construction of two Residential Quarters for Civil Judge (J.D.) at Rajura, Dist. Chandrapur.

4398 No.CRQ-1709/ C.R.87/D-13, Date- 28.11.2011

4300

14 Construction of two Residential Quarters for Civil Judge (J.D.) and J.M.F.C. at Chakur, Dist. Latur.

5024 No.CRQ-3909/216/ C.R.23/D-13, Date-10.02.2011

5000

15 Construction of two Residential Quarters for Civil Judge (J.D.) at Paranda, Dist. Osmanabad.

3204 No.CRQ-2010/ CR.206/D-13, Date- 25.01.2012.

3200

16 Construction of two Residential Quarters for Additional District & Seesion Judge & two Residential Quarters for Civil Judge (J.D.) at Achalapur, Dist. Amaravati.

11633 No.CRQ-1209/793/ C.R.108/D-13, Date- 25.01.2012.

11600

17 Construction of One Residential Quarters for Civil Judge (J.D.) at Pombhurna, Dist. Chandrapur.

4000 No.CRQ-1710/259/ C.R.65/D-13, Date- 25.01.2012.

4000

18 Construction of Residential Quarters for Civil Judge (J.D.) & J.M.F.C. at Mantha, Dist. Jalna.

1929 No.CRQ-2010/785/ C.R.249/D-13, Date- 25.01.2012.

1900

19 Construction of one Residential Quarters for Civil Judge (J.D.) at Zari-Jamni, Dist. Yavatmal.

2425 No.CRQ-2011/ C.R75/D-13, Date- 25.01.2012.

2400

20 Construction of two Residential Quarters for Civil Judge (J.D.) at Kaij, Dist. Beed.

3575 No.CRQ-2010/550/ C.R.153/D-13, Date- 25.01.2012.

3500

21 Construction of three Residential Quarters for Civil Judge (J.D.) at Varud, Dist. Amaravati.

6438 No.CRQ-2011/ C.R.105/D-13, Date- 25.01.2012.

6400

22 Construction of one Residential Quarters for Civil Judge (J.D.) at Mohadi, Dist. Bhandara.

1936 No.CRQ-2012/ C.R.154/D-13, Date- 24.02.2012.

1900

23 Construction of five Residential Quarters for Judicial Officers at Gadhinglaj, Dist. Kolhapur.

11424 No.CRQ-2209/ C.R.174/D-13, Date- 19.10.2010.

11400

24 Construction of Residential Quarters for Civil Judge (J.D.) & J.M.F.C. at Sinnar, Dist. Nashik.

1542 No.CRQ-2509/900/ C.R.191/D-13, Date- 30.10.2010.

1500

25 Construction of two Residential Quarters for Civil Judge (J.D.) at Kalmeshwar, Dist. Nagpur.

5096 No.CRQ-2011/1165/ C.R.236/D-13, Date- 24.02.2012.

5000

26 Construction of three Residential Quarters for Civil Judge (J.D.) at Chandur Bazar, Dist. Amaravati.

4951 No.CCB-1209/869/ C.R.175/D-13, Date- 24.02.2012.

4900

* Note - The provision for the work of Sr. No. 14 to 26 is a Central Share.

3

PUBLIC WORKS DEPARTMENT

Rs. (04)(01) Works executed through NABARD loan

Assistance (5054 075 2)99,65,00,000

Item no. - 25. Provision for construction of new road and bridge works

Recurrent --Rs. Nil Non Recurrent -- Rs. 99,65,00,000--

Total- -- Rs. 99,65,00,000-- Altimate Annual Recurrent- Nil

Remarks - It has been decided to make available funds for the construction of new road and bridge worksThe details of works are shown as under : -

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 75054 Capital Outlay on Roads & Bridges(04)(01) Works executed through NABARD loanAssistance

1 Kolhapur Gargoti Vengrul Bashyachamola Mani Patgaon MDR 58Km 0/00 to 1/00 Tal- Bhudargad Dist.- Kolhapur

3656 No.NBD2011/C.R.1/ Pln-3Dt.14/12/2011

583 Urgent Work

2 Pune Improvement to Shikrapur to Malathan Road MDR-51km 12/0 to 13/00 Tal:-Shirur

3080 No.NBD2011/C.R.2/ Pln-3Dt.14/12/2011

491 Urgent Work

3 Raigad Construction of Major Bridge across Kaleshri Creek onCostal Highway MSH-4 in Taluka Pen, District Raigad

390769 No.NBD2011/C.R.3/ Pln-3Dt.14/12/2011

10090 Urgent Work

4 Sangli Morale to Gauragaon MDR 30 Km. 15/00 to 16/500 Tal.Tasgaon Dist. Sangli

3848 No.NBD2011/C.R.4/ Pln-3Dt.14/12/2011

613 Urgent Work

5 Satara Improvements to Pusegaon Vaduj Katarkhatav KaledhonPimpari road. MDR 43 Section- SH 10 to Palasgaon. Km28/00 to 29/450 Tal- Khatav Dist. Satara

2622 No.NBD2011/C.R.5/ Pln-3Dt.14/12/2011

418 Urgent Work

6 Solapur Improvements to Shindewadi to Deshmukhwadi RoadMDR 84 Km 7/300 to 10/800 Tal- Malshiras Dist-Solapur

5700 No.NBD2011/C.R.6/ Pln-3Dt.14/12/2011

909 Urgent Work

7 Pune Baramati Kalamb Bawada Narsingpur Road MDR.72 km20/850 to 23/300 Tal.Indapur Dist-Pune.

10160 No.NBD2011/C.R.7/ Pln-3Dt.14/12/2011

1619 Urgent Work

8 Kolhapur ST & BT to Amba Vishalgad road MDR-8 Km 14/00 to15/650 (Sec :- Kemburnewadi to Wani Peth Gajapur)Tal.Shahuwadi Dist.Kolhapur

3824 No.NBD2011/C.R.8/ Pln-3Dt.14/12/2011

610 Urgent Work

9 Pune Strengthening and Black Topping to Veer ValhaWagadharwadi Road MDR-50 Km 13/00 to 14/500 Tal-Purandhar Dist-Pune

3114 No.NBD2011/C.R.9/ Pln-3Dt.14/12/2011

496 Urgent Work

10 Raigad Construction of Major Bridge across Dharmtar Creekbetween Ghoda Bandar & Bahirichapada on CostalHighway MSH-4 in Taluka Alibag, District Raigad.

2320316 No.NBD2011/C.R.10/ Pln-3Dt.14/12/2011

59910 Urgent Work

11 Sangli Improvements to Sagaon Mangale Chikurde KundalwadiTandulwadi road MDR 3 Km 36/350 to 38/00

6652 No.NBD2011/C.R.11/ Pln-3Dt.14/12/2011

1060 Urgent Work

12 Satara Improvement to Bhor Atit Khandala Lonand Road MDR3 Km 24/00 to 25/00 Sec.Khadala to Mhavshi Tal-Khanadala, Dist. Satara

2679 No.NBD2011/C.R.12/ Pln-3Dt.14/12/2011

427 Urgent Work

13 Solapur Improvement to Dayati to chicholi road MDR-73,Km.21/000 to 24/00, Taluka-Sangola,Dist.solapur

6000 No.NBD2011/C.R.13/ Pln-3Dt.14/12/2011

956 Urgent Work

14 Pune Improvement to Jejuri Rajuri khor Bhandgaon to NH-9MDR-64 km 27/00 to 30/800 Tal:-Daund

10835 No.NBD2011/C.R.14/ Pln-3Dt.14/12/2011

1727 Urgent Work

15 Kolhapur Improvement to road from Donawade Pati KhupireYavaluz Majanal Bajarbhogaon Kolik Padasali roadMDR-23 Km 29/00 to 31/250 Tal.Panhala Dist.Koplhapur

4000 No.NBD2011/C.R.15/ Pln-3Dt.14/12/2011

638 Urgent Work

16 Pune Improvement to Nimgaon Dude Takal- Haji Road MDR-51 km 25/0 to 26/00 Tal:-Shirur

3205 No.NBD2011/C.R.16/ Pln-3Dt.14/12/2011

511 Urgent Work

17 Sangli Construction of Bridge on Nerle Kapuskhed road ODR22 Km 3/500 Tal Walwa Dist Sangli

6662 No.NBD2011/C.R.17/ Pln-3Dt.14/12/2011

1062 Urgent Work

18 Satara Improvements to Malawadi Parkhandi Todale BijwadiPachawad Thadale road. MDR 42 Section- Parkhandi toPartawadi phata. Km 5/150 to 6/00 Tal- Man, Dist.Satara

2907 No.NBD2011/C.R.18/ Pln-3Dt.14/12/2011

463 Urgent Work

5054 Capital Outlay on Roads & Bridges

Schemes in Five Year Plan

(Rs. in thousands)

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

19 Solapur Improvement to Nazare Kole Pachegaon road MDR-78,Km.9/000 to 12/00,Taluka-Sangola,Dist.solapur (Actual. Km.9/00 to 12/00)

6000 No.NBD2011/C.R.19/ Pln-3Dt.14/12/2011

956 Urgent Work

20 Pune Improvement to Karla bhaje to Lohgad MDR 25 K. M.6/200 to 10/00Tal Maval

11863 No.NBD2011/C.R.20/ Pln-3Dt.14/12/2011

1891 Urgent Work

21 Kolhapur Improvement to Donoli Charan Saidapur ThergaonSawarde Satve Mohare Kodoli road MDR-7 Km 19/800to 21/600 Tal.Panhala Dist. Kolhapur

4336 No.NBD2011/C.R.21/ Pln-3Dt.14/12/2011

691 Urgent Work

22 Pune Improvement to Kopre Mandve Udapur DolwadiPimpalwadi road MDR 4 KM 42/00 to 43/00.TalJunnar

3324 No.NBD2011/C.R.22/ Pln-3Dt.14/12/2011

530 Urgent Work

23 Sangli Improvements to Mangrul Sagaon Mangle ChikurdeTandulwadi Dudhgaon road MDR-3 Km 33/700 to36/350

6741 No.NBD2011/C.R.23/ Pln-3Dt.14/12/2011

1074 Urgent Work

24 Satara Improvements to Phaltan Pusegaon Aundh Nimsod road. MDR 20 Section- Palshi to Bhushangad road. Ch. 74/00to75/00 Tal- Khatav Dist. Satara

2907 No.NBD2011/C.R.24/ Pln-3Dt.14/12/2011

463 Urgent Work

25 Solapur Construction of Minor Bridge on Patkal - NadeshwarRoad MDR-65 at Ch. 6/200 near village Khadaki,Tal:Mangalwedha, Dist:Solapur

6023 No.NBD2011/C.R.25/ Pln-3Dt.14/12/2011

960 Urgent Work

26 Pune Improvement to Mandavgan farata to Tandali (MDR 100)Km. 50/00 to 52/00 Tal- Shirur

12000 No.NBD2011/C.R.26/ Pln-3Dt.14/12/2011

1913 Urgent Work

27 Kolhapur Construction of Bridge on Kappoorwadi to MincheLatwade Bhadole ODR 38 road @ Km 2/600

5177 No.NBD2011/C.R.27/ Pln-3Dt.14/12/2011

825 Urgent Work

28 Pune Improvement to Ganegaon to Ranjangaon Ganpati Km20/00 to 21/00 MDR 52 Tal Shirur

3475 No.NBD2011/C.R.28/ Pln-3Dt.14/12/2011

554 Urgent Work

29 Sangli Bastavade to S.H. 136 MDR 35 Km. 21/500 to 23/200Tal. Tasgaon Dist. Sangli

6907 No.NBD2011/C.R.29/ Pln-3Dt.14/12/2011

1101 Urgent Work

30 Satara Widening of carriageway of Jor Wai Pachwad Medharoad MDR-11 Km.20/00 to 22/00 Section - Nahalewadito Boriv Tal.Wai Dist.Satara

3000 No.NBD2011/C.R.30/ Pln-3Dt.14/12/2011

478 Urgent Work

31 Solapur Improvements to SH 70 to Nimagaon Road MDR 79 Km12/800 to 15/500 Tal- Malshiras Dist- Solapur.

6735 No.NBD2011/C.R.31/ Pln-3Dt.14/12/2011

1074 Urgent Work

32 Pune Improvements to Hadapsar Manjari Road MDR 56 Km3/500 to 5/00 Tal.Haveli Dist. Pune

12000 No.NBD2011/C.R.32/ Pln-3Dt.14/12/2011

1913 Urgent Work

33 Kolhapur Construction of Bridge on Tardal Khotwadi ODR 47road @ Km 5/800

5255 No.NBD2011/C.R.33/ Pln-3Dt.14/12/2011

838 Urgent Work

34 Pune Improvement to Kavate to Phakate Km 28/800 to29/800 MDR 23 Tal Shirur

3600 No.NBD2011/C.R.34/ Pln-3Dt.14/12/2011

574 Urgent Work

35 Sangli Improments to Shamgaon Shalgaon KadegaonChinchani (Wangi) Takari Road MDR 18 Km.10/500 to12/500, Sect. Shivaji nagar to Kadegaon Tal.KadegaonDist.Sangli.

7250 No.NBD2011/C.R.35/ Pln-3Dt.14/12/2011

1156 Urgent Work

36 Satara Improvement to Tasgaon Varne Nagthane Road, MDR34 Km 3/00 to 5/00,Sect- Tasgaon to Angapur Tal-Satara , Dist. Satara

3433 No.NBD2011/C.R.36/ Pln-3Dt.14/12/2011

547 Urgent Work

37 Solapur Improvements to Morwad To Pimpalwadi Road MDR 3Km. 7/000 To 9/500 Tal- Karmala, Dist- Solapur

7832 No.NBD2011/C.R.37/ Pln-3Dt.14/12/2011

1248 Urgent Work

38 Pune Improvement toBaramati Kalamb Bawada NarsingpurRoad MDR.72 Km.65/500 to 67/600 Tal:-IndapurDist.Pune.

14312 No.NBD2011/C.R.38/ Pln-3Dt.14/12/2011

2281 Urgent Work

39 Kolhapur Improvements to Lingnoor Kapshi Madhyal MDR 57road Km 4/600 to 6/400

5484 No.NBD2011/C.R.39/ Pln-3Dt.14/12/2011

874 Urgent Work

40 Pune Improvement to Midgulwadi to Kavathe Road MDR-23km 20/0 to 21/500 Tal:-Shirur

3770 No.NBD2011/C.R.40/ Pln-3Dt.14/12/2011

601 Urgent Work

41 Sangli Anjani to Wadgaon MDR 72 Km. 2/00 to 4/00 TalTasgaon Dist Sangli

7332 No.NBD2011/C.R.41/ Pln-3Dt.14/12/2011

1169 Urgent Work

42 Satara Improvements to Falani to Bamnoli Road MDR 25 Km.37/500 to 39/300 Tal. Jawali

3460 No.NBD2011/C.R.42/ Pln-3Dt.14/12/2011

552 Urgent Work

43 Solapur Improvement to Gopalpur-Mudhewadi-Chale-Ambheroad MDR-94 Km 3/800 to 5/800 Tal:Pandharpur, Dist:Solapur

7873 No.NBD2011/C.R.43/ Pln-3Dt.14/12/2011

1255 Urgent Work

44 Pune Improvement to Jejuri Murali Mudhale Dhakale MedadRoad km.41/000 to 46/000

14691 No.NBD2011/C.R.44/ Pln-3Dt.14/12/2011

2342 Urgent Work

45 Kolhapur Improvements to Bidri Kenwade Bastawade MDR 52road Km 12/400 to 14/400

5812 No.NBD2011/C.R.45/ Pln-3Dt.14/12/2011

926 Urgent Work

46 Pune Improvements to Pune Khadakwasala Donje KhanapurRoad MDR 35 Km 21/00 to 21/500 & 22/600 to23/200 Tal. Haveli Dist. Pune

3879 No.NBD2011/C.R.46/ Pln-3Dt.14/12/2011

618 Urgent Work

47 Sangli Rajapur Turchi Nimani MDR 34 Km. 15/500 to 17/500 7541 No.NBD2011/C.R.47/ Pln-3Dt.14/12/2011

1202 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

48 Satara Improvements to Dare to Aalewadi Road MDR 11Km.51/600 to 53/700 Tal. Jawali

3500 No.NBD2011/C.R.48/ Pln-3Dt.14/12/2011

558 Urgent Work

49 Solapur Improvements to Tulshi Chambharvihir road MDR 88Km 3/400 to 6/700 Tal- Madha, Dist- Solapur

8260 No.NBD2011/C.R.49/ Pln-3Dt.14/12/2011

1317 Urgent Work

50 Pune Widening & Strengthening of Baramati Malad MekhaliRoad Km.1/00 to 5/00

17383 No.NBD2011/C.R.50/ Pln-3Dt.14/12/2011

2771 Urgent Work

51 Kolhapur Improvement to Andur Mandukali Mandur ShindewadiVetwade to Balewadi road MDR-30 Km 9/00 to 12/500Tal.Gaganbavada Dist. Koplhapur

5976 No.NBD2011/C.R.51/ Pln-3Dt.14/12/2011

953 Urgent Work

52 Pune Improvement to Kalamb Khadki Nirgudsar Loni roadKM 37/500 to 38/500.. Tal Ambegaon

4196 No.NBD2011/C.R.52/ Pln-3Dt.14/12/2011

669 Urgent Work

53 Sangli Improvement to Nerle Kapuskhed Islampur road ODR22 Km 4/200 to 8/00 Tal Walwa Dist Sangli

7610 No.NBD2011/C.R.53/ Pln-3Dt.14/12/2011

1213 Urgent Work

54 Satara Improvement to Pusegaon Vaduj KatharKhatav Road,MDR43 Km 5/00 to 6/400,Sect- Katakarwadi to KhatavTal- Khatav , Dist. Satara

3820 No.NBD2011/C.R.54/ Pln-3Dt.14/12/2011

609 Urgent Work

55 Solapur Improvements to Arjunnagar Mirgavan Road MDR 9Km. 2/00 To 6/000 Tal- Karmala, Dist- Solapur

8625 No.NBD2011/C.R.55/ Pln-3Dt.14/12/2011

1375 Urgent Work

56 Pune Construction of Major Bridge across Bhima river onRahu Walaki to Ranjangaon Sandas road ODR-98 Tal.Daund

79313 No.NBD2011/C.R.56/ Pln-3Dt.14/12/2011

3966 Urgent Work

57 Kolhapur Improvements to Sambhapur Tasgaon SawardeNarande MDR 12 road 12/00 to 14/00

6000 No.NBD2011/C.R.57/ Pln-3Dt.14/12/2011

956 Urgent Work

58 Pune Widening and Strethening of Bhamboli chakan KalujTawadi road MDR 20 K. M. 6/000 to 8/00. Tal Khed

4410 No.NBD2011/C.R.58/ Pln-3Dt.14/12/2011

703 Urgent Work

59 Sangli Construction of Bridge on Vategaon Takave Wakurde(Bk.) MDR 5 at Km 0/500 Tal Walwa Dist Sangli

8747 No.NBD2011/C.R.59/ Pln-3Dt.14/12/2011

1394 Urgent Work

60 Satara Improvements to Jinti Phaltan Malawadi Nidhal DarjaiDaruj Bhurkawadi Kuroli Aundh road. MDR 17 Section-Varud to Siddheshwar Kuroli MDR 17 Km 70/00 to71/950 Tal- Khatav Dist. Satara

3884 No.NBD2011/C.R.60/ Pln-3Dt.14/12/2011

619 Urgent Work

61 Solapur Improvements to Garwad to Nimagaon Road MDR 86Km 32/00 to 37/500 Tal- Malshiras Dist- Solapur

9695 No.NBD2011/C.R.61/ Pln-3Dt.14/12/2011

1545 Urgent Work

62 Pune Construction of Major Bridge across Bhima river NearVillage Darekar on Deulgaon rage- Wadgaon DarekarPedgaon Road MDR-85 Tal. Daund.

129088 No.NBD2011/C.R.62/ Pln-3Dt.14/12/2011

6454 Urgent Work

63 Kolhapur Improvement to Porle Majgaon road MDR-22 Km.0/00to 2/500 Tal.Panhala Dist. Koplhapur

6106 No.NBD2011/C.R.63/ Pln-3Dt.14/12/2011

973 Urgent Work

64 Pune S.T.B.T.Talegaon Station to Karanjevihire Pait KadujKhed Gulani Vaphgaon Loni road MDR 15 KM 46/000to 48/000 Tal Khed.

4500 No.NBD2011/C.R.64/ Pln-3Dt.14/12/2011

717 Urgent Work

65 Sangli Improvements to Wakurde Bk. To Antri Bk. Road MDR 1in Tal.Shirala, Dist.Sangli. Km. 33/00 to 37/000.

9566 No.NBD2011/C.R.65/ Pln-3Dt.14/12/2011

1525 Urgent Work

66 Satara Improvements to Malawadi Parkhandi Todale BijwadiPachawad Thadale road. MDR 42 Section- Hastinapur toThadale Km 31/200 to 32/600 Tal- Man Dist. Satara

3927 No.NBD2011/C.R.66/ Pln-3Dt.14/12/2011

626 Urgent Work

67 Solapur Improvements to Podhawadi To Vihal Road MDR 5 Km8/800 To 12/000 Tal- Karmala, Dist- Solapur

9998 No.NBD2011/C.R.67/ Pln-3Dt.14/12/2011

1594 Urgent Work

68 Pune Improvements to Wagholi Manjari Road MDR 56 Km2/00 to 4/100 Tal. Haveli, Dist. Pune

20000 No.NBD2011/C.R.68/ Pln-3Dt.14/12/2011

3188 Urgent Work

69 Kolhapur Improvements to Kabnoor Ganganagar Shahapur MDR37 road Km 0/500 to 3/00

6113 No.NBD2011/C.R.69/ Pln-3Dt.14/12/2011

974 Urgent Work

70 Pune Improvements to Donaje Sinhagad Kondanrpur RoadMDR 36 Km 11/400 to 13/000 Tal.Haveli Dist. Pune

4561 No.NBD2011/C.R.70/ Pln-3Dt.14/12/2011

727 Urgent Work

71 Sangli Improvements to Fakirwadi to Mangale road MDR 8 inTal. Shirala, Dist. Sangli. Km. 6/00 to 9/00

10850 No.NBD2011/C.R.71/ Pln-3Dt.14/12/2011

1729 Urgent Work

72 Satara Improvement to Vaduth Satararoad to AmbawadeKinahi Road, MDR 28 Km 8/500 to 10/500,Sect- KhedPhata to Kinhai Tal- Koregoan , Dist. Satara

4310 No.NBD2011/C.R.72/ Pln-3Dt.14/12/2011

687 Urgent Work

73 Solapur Improvement of Nimboni to Shiddhenkeri Road MDR-53Km 38/400 to 43/300 Tal:Mangalwedha,Dist :Solapur

11893 No.NBD2011/C.R.73/ Pln-3Dt.14/12/2011

1896 Urgent Work

74 Kolhapur Construction of Bridge on Herle Mouje Wadgaon ODR40 road @ Km 1/200

6119 No.NBD2011/C.R.74/ Pln-3Dt.14/12/2011

975 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

75 Pune Improvement to SH-62 to Khutbav Pimpalgaonkhamgaon road km 4/00 to 5/500 (Part - Tollnaka toKhutbav ) Tal:-Daund

4761 No.NBD2011/C.R.75/ Pln-3Dt.14/12/2011

759 Urgent Work

76 Sangli Const. Of Submersible Bridge on Kanegaon ShigaonDhudhagaon Road across Sarali Bet Nalla ODR-38 inTal. Miraj Dist. Sangli

24359 No.NBD2011/C.R.76/ Pln-3Dt.14/12/2011

3883 Urgent Work

77 Satara Improvement to Ambawade Arabwadi Banwadi GaneshKhind Road, MDR 27 Km 8/00 to 10/00,Sect-SH 75 toGanesh Khind Tal- Koregoan , Dist. Satara

4402 No.NBD2011/C.R.77/ Pln-3Dt.14/12/2011

702 Urgent Work

78 Solapur Improvements to Malvandi Manegon Road MDR 21 Km.26/00 to 31/00 Tal- Madha, Dist- Solapur

12323 No.NBD2011/C.R.78/ Pln-3Dt.14/12/2011

1964 Urgent Work

79 Kolhapur ST & BT to road from SH 130 to Kadgaon MamadapurNavale Deokandgaon Pernoli Salgaon to Join SH 134,MDR 65 Section - Taluka Border to Koriwade phata Km10/500 to 12/500, Tal- Ajara, Dist.- Kolhapur

8267 No.NBD2011/C.R.79/ Pln-3Dt.14/12/2011

1318 Urgent Work

80 Pune Strengthening and Black Topping to Jejuri KolvihareMurti Road MDR-66 Km 1/600 to 3/850 Tal-PurandharDist-Pune

4858 No.NBD2011/C.R.80/ Pln-3Dt.14/12/2011

774 Urgent Work

81 Sangli Impts to Bhambarde to Bhud MDR 25 Km. 6/00 to18/00

26447 No.NBD2011/C.R.81/ Pln-3Dt.14/12/2011

4215 Urgent Work

82 Satara Improvement to Jinti Phaltan Nirgudi girvi Road MDR15 Km 12/00 to 14/00 Sec. Girvi Naka to Sai MandirTal- Phaltan, Dist. Satara

4444 No.NBD2011/C.R.82/ Pln-3Dt.14/12/2011

708 Urgent Work

83 Solapur Improvement to Lotewadi Achakdani waki HaldahiwadiKhardi road MDR-72, Km.9/200 to 16/400,Taluka-Sangola, Dist.solapur

13950 No.NBD2011/C.R.83/ Pln-3Dt.14/12/2011

2224 Urgent Work

84 Kolhapur Construcation of Minor Bridge on ShahunakaShantiniketan Pachgaon S.H. 128 at 0/950 includingappoaches

8655 No.NBD2011/C.R.84/ Pln-3Dt.14/12/2011

1380 Urgent Work

85 Pune Improvements to Khanapur Panshet Road MDR 37 Km1/400 to 3/000 Tal.Haveli Dist. Pune

4867 No.NBD2011/C.R.85/ Pln-3Dt.14/12/2011

776 Urgent Work

86 Sangli Construction of Minor Bridges on Vita Tasgaon RoadS.H.-10 @ Km. 144/300, 144/400, 144/500 Tal.Khanapur , Dist. Sangli

28103 No.NBD2011/C.R.86/ Pln-3Dt.14/12/2011

4479 Urgent Work

87 Satara Improvement to MDR 25 to Songaon Kumthe AsangaonRoad MDR 37 Km 4/500 to 6/00 Sec. Shivajinagar toSherewadi Tal- Satara , Dist. Satara

4454 No.NBD2011/C.R.87/ Pln-3Dt.14/12/2011

710 Urgent Work

88 Solapur Improvements to Ropale Tungat Suste Puluj Road MDR67 Km. 10/00 to 14/00 Part Tarapur Junction to Vite(Part Tarapur Junction to Kharsoli Km 10/00 to 14/400) Tal. Pandharpur Dist- Solapur

14418 No.NBD2011/C.R.88/ Pln-3Dt.14/12/2011

2298 Urgent Work

89 Kolhapur Widening to road start from Chennekupi Nool BasargeHalkarni up to State Border road MDR 64 Km 0/00 to2/500, Tal- Gadhinglaj, Dist.- Kolhapur

9045 No.NBD2011/C.R.89/ Pln-3Dt.14/12/2011

1442 Urgent Work

90 Pune Improvement to Kanhur Mesai Midgulwadi Road Km15/400 to 16/500 MDR 23 Tal Shirur

4934 No.NBD2011/C.R.90/ Pln-3Dt.14/12/2011

786 Urgent Work

91 Sangli Improvements to Karoli (m) Yogewadi Malangaon KuchiNagole Ankale Baj Kuchi MDR-57 Sect. Khandsari toKanthi Km. 32/00 to 33/500 Tal.Jath Dist-Sangli

3417 No.NBD2011/C.R.91/ Pln-3Dt.14/12/2011

545 Urgent Work

92 Satara Improvement to Koregaon Bhadale Chilewadi Road,MDR 30 Km 8/00 to 10/00,Sect- Chachali Phata toShendurjane Tal- Koregoan , Dist. Satara

4546 No.NBD2011/C.R.92/ Pln-3Dt.14/12/2011

725 Urgent Work

93 Solapur Improvement to Paithan pandharpur palkhi marg MDR-133, Part-Aran Madha taluka border to Karkambnematwadi phata road Km.48/00 to 53/800,Taluka-pandharpur, Dist.solapur (Actual km.48/00 to 53/800.)

18299 No.NBD2011/C.R.93/ Pln-3Dt.14/12/2011

2917 Urgent Work

94 Kolhapur Improvements to Gadhinglaj Hadalge Titta Belewadi (Ka)Km 15/00 to 18/800

9254 No.NBD2011/C.R.94/ Pln-3Dt.14/12/2011

1475 Urgent Work

95 Pune Strengthening and Black Topping to Bhor PasurePangare Road MDR-44 Km 22/600 to 24/225 (Part -Pangari to Kodgaon) Tal-Bhor Dist-Pune

5010 No.NBD2011/C.R.95/ Pln-3Dt.14/12/2011

799 Urgent Work

96 Sangli Improvements to road from MSH-3 to Mhaisal MDR-40Sect Subhashnagar to Vijaynagar Km 4/800 to 6/00 inTal. Miraj Dist-Sangli

4084 No.NBD2011/C.R.96/ Pln-3Dt.14/12/2011

651 Urgent Work

97 Satara Improvement to Shendre Satara Kas Bamnoli Road MDR 25 Km 14/300 to 16/200 Sec. Yewteshwar to AnawaleTal- Satara , Dist. Satara

4573 No.NBD2011/C.R.97/ Pln-3Dt.14/12/2011

729 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

98 Solapur Improvements to SH 70 (Pirachi Koroli Phata ) toBhalavani Road MDR 69 Km 0/00 to 6/00 Tal-Pandharpur Dist-Solapur

18779 No.NBD2011/C.R.98/ Pln-3Dt.14/12/2011

2993 Urgent Work

99 Kolhapur Gargoti Vengrul Bashyachamola Mani Patgaon MDR 58Km 36/00 to 37/500 Tal- Bhudargad Dist.- Kolhapur

10504 No.NBD2011/C.R.99/ Pln-3Dt.14/12/2011

1674 Urgent Work

100 Pune Strengthening and Black Topping to Malwadi HarnasMale Bhutonde Road MDR-43 Km 38/00 to 39/700(Part -Sutarwadi to Dhare) Tal-Bhor Dist-Pune

5046 No.NBD2011/C.R.100/ Pln-3Dt.14/12/2011

804 Urgent Work

101 Sangli Improvements to Shiganhalli Walekindi Chorochi DorliDeshing Kumathe MDR-54 Sect. Beunur to talukaBorder Km. 13/00 to 15/00 Tal.Jath Dist-Sangli

6085 No.NBD2011/C.R.101/ Pln-3Dt.14/12/2011

970 Urgent Work

102 Satara Improvement to Surur Vahagaon Randullabad NandwalPadali Nibodi Lonand Road MDR 9 Km 26/500 to28/500 Sec. Nibodi gat Vasti to Lonand

4765 No.NBD2011/C.R.102/ Pln-3Dt.14/12/2011

760 Urgent Work

103 Solapur Improvements to Najik Pimpari shejababulgaon AnkoliIchgaon Road MDR 56 km 3/00 to 10/00 Taluka MoholDist-Solapur

19090 No.NBD2011/C.R.103/ Pln-3Dt.14/12/2011

3043 Urgent Work

104 Kolhapur Impts to Bridge on Nile Karngale Pusarle Bhendwaderoad (MDR-2) Sec :- Altur Harujanwadi Pusarle @Ch.4/00 Tal.Shahuwadi Dist.Kolhapur

10937 No.NBD2011/C.R.104/ Pln-3Dt.14/12/2011

1743 Urgent Work

105 Pune Improvements to Pune Kondhawa Saswad Road MDR-60Km 4/700 to 6/300 Tal-Haveli Dist-Pune

5153 No.NBD2011/C.R.105/ Pln-3Dt.14/12/2011

821 Urgent Work

106 Sangli Improvements to KavatheMahankal KhanderajuriMalgaon Miraj MDR-52 Sect. Malgaon to SubhashnagarKm 57/500 to 60/500 in Tal. Miraj Dist-Sangli

6923 No.NBD2011/C.R.106/ Pln-3Dt.14/12/2011

1103 Urgent Work

107 Satara Improvements to SH 69 to Gursale Shirswadi NimsodMasurne to SH 76, MDR 50 Section- Umbarde. ToGursale Km 2/00 to 4/500 Tal- Khatav Dist. Satara

4852 No.NBD2011/C.R.107/ Pln-3Dt.14/12/2011

773 Urgent Work

108 Solapur Improvements to Vairag Hingani Malegaon ChikhardeRoad MDR 27 Km 0/00 to 9/00 Tal-Barsi Dist-Solapur

20000 No.NBD2011/C.R.108/ Pln-3Dt.14/12/2011

3188 Urgent Work

109 Kolhapur Improvements to I.T.I. Pachgaon Girgaon NandgaonMDR 35 road Km 7/00 to 11/00

10953 No.NBD2011/C.R.109/ Pln-3Dt.14/12/2011

1746 Urgent Work

110 Pune Improvement to Narayangaon Manjarwadi Shirur roadMDR 12 KM 1/000 to 3/000.Tal Junnar

5475 No.NBD2011/C.R.110/ Pln-3Dt.14/12/2011

873 Urgent Work

111 Sangli Const. of Nandre Mouje Digraj road VR-6 Km. 2/00 to3/500.

6932 No.NBD2011/C.R.111/ Pln-3Dt.14/12/2011

1105 Urgent Work

112 Satara Construction of Bridge on Vele to solshi Road MDR.8At. Km. 22/00, Near Shanimandir Taluka :- Koregaon.District - Satara.

5239 No.NBD2011/C.R.112/ Pln-3Dt.14/12/2011

835 Urgent Work

113 Solapur Improvements to Solapur Hotgi Auj Ingalgi Road MDR-39 Km. 16/00 to 17/700 Tal. South Solapur Dist-Solapur

5000 No.NBD2011/C.R.113/ Pln-3Dt.14/12/2011

797 Urgent Work

114 Kolhapur Improvements to S.H 115 to Balinga Arale GhanwadeMDR 34 road 11/800 to 14/800 Sect II Savarwadi toSavarde Dumala

11735 No.NBD2011/C.R.114/ Pln-3Dt.14/12/2011

1870 Urgent Work

115 Pune Improvement to Loni Savindane road (Loni to TalukaBorder) KM 40/000 to 42/500. . Tal Ambegaon

5498 No.NBD2011/C.R.115/ Pln-3Dt.14/12/2011

876 Urgent Work

116 Sangli Improvements to Tung-Kasabe Digraj-Sangliwadi RoadODR-106 Km. 9/300 to 11/400. (Km. 9/300 to 11/400)

7775 No.NBD2011/C.R.116/ Pln-3Dt.14/12/2011

1239 Urgent Work

117 Satara Reconstruction of Bridgeon Patan Mandure Jalav Taraleroad MDR-51 at Km 9/250 Tal.Patan Dist.Satara

5337 No.NBD2011/C.R.117/ Pln-3Dt.14/12/2011

851 Urgent Work

118 Solapur Improvements to Mandrup Malkavthe SadepurAnandnagar Bhandarkavthe Road MDR- 55 Km 18/500to 21/00 Tal. South Solapur Dist- Solapur

9000 No.NBD2011/C.R.118/ Pln-3Dt.14/12/2011

1435 Urgent Work

119 Kolhapur Construction of Bridge on Bubnal to Allas ODR 57 road@ Bubnal Km 2/250

15334 No.NBD2011/C.R.119/ Pln-3Dt.14/12/2011

2444 Urgent Work

120 Pune Widening and Strethening Talegaon Station toKaranjevihire Pait Kaduj Khed Gulani Vaphgaon Loniroad MDR 15 KM 40/000 to 42/400.Tal Khed

5500 No.NBD2011/C.R.120/ Pln-3Dt.14/12/2011

877 Urgent Work

121 Sangli Improvements to Yelari Jath Umarni Kakmari to StateBordar MDR-60 Sect. Jath to Umarani Km. 30/00 to33/500 Tal. Jath Dist-Sangli

8779 No.NBD2011/C.R.121/ Pln-3Dt.14/12/2011

1399 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

122 Satara Improvemets to Jambhali Wai road MDR-10 Km.5/700to 8/500 Section - Renawale to Asre Tal.Wai Dist.Satara

5500 No.NBD2011/C.R.122/ Pln-3Dt.14/12/2011

877 Urgent Work

123 Solapur Improvements to Solapur Dongaon Telgaon Road MDR35 Km 0/00 to 1/500 and 4/500 to 7/00 Tal. NorthSolapur Dist- Solapur

9675 No.NBD2011/C.R.123/ Pln-3Dt.14/12/2011

1542 Urgent Work

124 Kolhapur Construction of Bridge on Udgaon ChinchwadArjunwad MDR 17 @ Km 7/00

17959 No.NBD2011/C.R.124/ Pln-3Dt.14/12/2011

2863 Urgent Work

125 Pune Improvement to Baramati Tandulwadi Katfal RoadKm.4/00 to 6/00

5634 No.NBD2011/C.R.125/ Pln-3Dt.14/12/2011

898 Urgent Work

126 Sangli Imp. To Bastwade Sawalaj Dongarsoni KundalapurWagholi Arewadi Dhalagaon Nimaj Ghorpadi Road MDR-37 Km.28/600 to 30/00 Tal K.Mahankal Dist. Sangli

9960 No.NBD2011/C.R.126/ Pln-3Dt.14/12/2011

1588 Urgent Work

127 Satara Improvement to Nisare Marul Gudhe Kalgaon roadMDR-58 Km. 27/575 to 30/00 (Section - Supugadewadito Dhamni) Tal.Patan Dist.Satara

5609 No.NBD2011/C.R.127/ Pln-3Dt.14/12/2011

894 Urgent Work

128 Solapur Improvements to Satan Dudhani to Udgi MDR-45 Km.8/400 to 13/400 Tal. AkkalkotDist- Solapur

10000 No.NBD2011/C.R.128/ Pln-3Dt.14/12/2011

1594 Urgent Work

129 Kolhapur Constn. of Major Bridge across Kumbhi river on roadfrom SH-115 to Margewadi Mandur road (VR-10 )Tal.Gaganbavada Dist. Kolhapur

52782 No.NBD2011/C.R.129/ Pln-3Dt.14/12/2011

2639 Urgent Work

130 Pune Improvements to Malwadi Harnas Male Bhutonde PasaliVaroti Harpud Road MDR 43Km 60/00 to 61/500 Tal.Velhe, Dist. Pune

5792 No.NBD2011/C.R.130/ Pln-3Dt.14/12/2011

923 Urgent Work

131 Sangli Improvements to road Sangli Kupwad Tanag MalgaonMDR-42 Km.7/200 to 8/400 & 9/400 to 12/500 in Tal.Miraj Dist-Sangli

10496 No.NBD2011/C.R.131/ Pln-3Dt.14/12/2011

1673 Urgent Work

132 Satara Nagthane Tarale Patan road MDR-34 Km.7/740 to10/200 (Section -Dhutalwadi to Tarale) Tal.PatanDist.Satara

5699 No.NBD2011/C.R.132/ Pln-3Dt.14/12/2011

908 Urgent Work

133 Solapur Improvements to Mangrul to Tadwal Road MDR.- 43Km. 23/00 to 28/00 Tal. Akkalkot Dist- Solapur

10003 No.NBD2011/C.R.133/ Pln-3Dt.14/12/2011

1594 Urgent Work

134 Kolhapur Constn. of Major Bridge across Warna river near villageSavarde on Savarde Kande road (MDR-6) to connectKolhapur & Sangli Dist. Tal.Panhala

98480 No.NBD2011/C.R.134/ Pln-3Dt.14/12/2011

4924 Urgent Work

135 Pune Improvements to Kasurdi Hatve Tambhad Velhe DhanepPanshet Road MDR 42 Km 48/00 to 50/00 Tal. Velhe,Dist. Pune

5818 No.NBD2011/C.R.135/ Pln-3Dt.14/12/2011

927 Urgent Work

136 Sangli Improments to Palus Amnapur MDR-16 Km. 1/00 to5/00 Tal. Palus Dist.Sangli.

15000 No.NBD2011/C.R.136/ Pln-3Dt.14/12/2011

2391 Urgent Work

137 Satara Improvement to Phaltan Asu Road MDR 14 Km 15/600to 17/600 Sec. Khatke Vsti to Gawli Nagar Tal- Phaltan,Dist. Satara

5751 No.NBD2011/C.R.137/ Pln-3Dt.14/12/2011

917 Urgent Work

138 Solapur Improvements to Shelgi Dahitane BakshihippargeRoad ODR 77 Km. 0/00 to 3/00 Tal. North SolapurDist- Solapur

10237 No.NBD2011/C.R.138/ Pln-3Dt.14/12/2011

1632 Urgent Work

139 Kolhapur Rajgoli Khurd to Kudnur road MDR 73 Km 14/500 to15/800 Tal- Radhanagari Dist.- Kolhapur

3964 No.NBD2011/C.R.139/ Pln-3Dt.14/12/2011

632 Urgent Work

140 Pune Improvement to Manchar chandoli road KM 0/000 to2/000. . Tal Ambegaon

5999 No.NBD2011/C.R.140/ Pln-3Dt.14/12/2011

956 Urgent Work

141 Satara Improvement to Dicholi Navaja Morgiri Garawade Sajurroad MDR-56 Km. 36/00 to 38/400 (Section - Lendhorito Zakade) Tal.Patan Dist.Satara

5788 No.NBD2011/C.R.141/ Pln-3Dt.14/12/2011

923 Urgent Work

142 Kolhapur Improvements to SH 131 to Isapur road Km 0/00 to3/00 Tal- Chandgad Dist.- Kolhapur

7659 No.NBD2011/C.R.142/ Pln-3Dt.14/12/2011

1221 Urgent Work

143 Pune Improvement to Junnar Bankar phata road MDR 12 KM10/00 to 13/00.Tal Junnar

6000 No.NBD2011/C.R.143/ Pln-3Dt.14/12/2011

956 Urgent Work

144 Satara Improvemets to Kumbhroshi Kalamgaon Tapola roadMDR-21 Km.15/00 to 18/00 Section - Dhuelgaon toDevali Tal.Mahabaleshwar Dist.Satara

5800 No.NBD2011/C.R.144/ Pln-3Dt.14/12/2011

924 Urgent Work

145 Kolhapur Improvement to Mangewadi Aknur Khindi VharawadeTarale road MDR 47 Km 5/400 to 10/00 Tal-Radhanagari Dist.- Kolhapur

12762 No.NBD2011/C.R.145/ Pln-3Dt.14/12/2011

2034 Urgent Work

146 Pune Strengthening and Black Topping to Jejuri MorgaonRoad MDR-65 Km 0/00 to 1/450 Tal-Purandhar Dist-Pune

6295 No.NBD2011/C.R.146/ Pln-3Dt.14/12/2011

1003 Urgent Work

147 Satara Construction of bridge on Venna river on SH-73 toBhamghar Road V.R. 112 Tal. Jawali

5833 No.NBD2011/C.R.147/ Pln-3Dt.14/12/2011

930 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

148 Pune Improvement to Awsari Nirgudsar Pargaon road KM6/000 to 9/000 (Awsari to Mengadewadi). Tal Ambegaon

6498 No.NBD2011/C.R.148/ Pln-3Dt.14/12/2011

1036 Urgent Work

149 Satara Construction of Minor bridge on Khubi to Rethare roadat 1/400 near village Khubi Tal.Karad Dist.Satara.

6042 No.NBD2011/C.R.149/ Pln-3Dt.14/12/2011

963 Urgent Work

150 Pune Improvement to Vaishakhare Naneghat Junner roadMDR1 km 30/300 to 36/00 Tal Junnar

6500 No.NBD2011/C.R.150/ Pln-3Dt.14/12/2011

1036 Urgent Work

151 Satara Improvements to Manewadi Kumbhargaon galmewadiYevati Ond road MDR-61 Km. 25/00 to 27/900Sec.Savade to UndalePhata Tal.Karad Dist.Satara

6877 No.NBD2011/C.R.151/ Pln-3Dt.14/12/2011

1096 Urgent Work

152 Pune Improvements to Pune Khadakwasala Donje KhanapurRoad MDR 35 Km 25/600 to 27/750 Tal. Haveli Dist.Pune

6630 No.NBD2011/C.R.152/ Pln-3Dt.14/12/2011

1057 Urgent Work

153 Satara Widening to Koregaon Bhadale Chilewadi Road, MDR 30Km 2/00 to 4/00,Sect- SH 74 to Kumathe Phata Tal-Koregoan , Dist. Satara

7201 No.NBD2011/C.R.153/ Pln-3Dt.14/12/2011

1148 Urgent Work

154 Pune Improvement to Wadhaghoda Junnar road KM 12/000to 14/400 (From Ghodegaon towards to Wada).. TalAmbegaon

7393 No.NBD2011/C.R.154/ Pln-3Dt.14/12/2011

1178 Urgent Work

155 Satara Improvements to kolewadi Tulsan Undale Jinti roadMDR-62 Km. 21/500 to 23/700 Sec. Undale toSalshirambe Tal.Karad Dist.Satara

7700 No.NBD2011/C.R.155/ Pln-3Dt.14/12/2011

1227 Urgent Work

156 Pune Improvement to Baramati Tandulwadi RavangaonBoribel Deulgaonraje road MDR-80 km 29/00 to 31/00Tal:-Daund

7440 No.NBD2011/C.R.156/ Pln-3Dt.14/12/2011

1186 Urgent Work

157 Satara Construction of minor Bridge on Helgaon Padali SurliRahimatpur Road MDR.40 At. Km. 15/625, Taluka :-Koregaon. District - Satara.

9394 No.NBD2011/C.R.157/ Pln-3Dt.14/12/2011

1497 Urgent Work

158 Pune Construction of major bridge on MancharBhimashankar road SH 53 at KM 12/700.(Near RuralHospital Ghodegaon) . Tal Ambegaon

7500 No.NBD2011/C.R.158/ Pln-3Dt.14/12/2011

1195 Urgent Work

159 Satara Construction of Minor bridge on Umbraj Indoli PalVadgaon road MDR-52 at Km. 7/300 Near VillageVadgaon Tal.Karad Dist.Satara

10148 No.NBD2011/C.R.159/ Pln-3Dt.14/12/2011

1618 Urgent Work

160 Pune S.T.B.T. Chakan Gadad Vandre road MDR 17 KM17/000 to 19/500.Tal Khed

7665 No.NBD2011/C.R.160/ Pln-3Dt.14/12/2011

1222 Urgent Work

161 Satara Improvements to Healgaon Padali Surli Rahimatpurroad MDR 40 Km 18/500 to 19/500 (GradeImprovement) Tal- Koregaon , Dist. Satara

11500 No.NBD2011/C.R.161/ Pln-3Dt.14/12/2011

1833 Urgent Work

162 Pune Improvement to Shingave Pimparkhed Jambhut Km22/800 to 26/00 MDR 14 Tal Shirur

7759 No.NBD2011/C.R.162/ Pln-3Dt.14/12/2011

1237 Urgent Work

163 Satara Improvement to Higangaon to Kaphshi Road MDR 5 Km11/00 to 15/00 Sec. Higangaon to Kaphshi Tal-Phaltan, Dist. Satara

11900 No.NBD2011/C.R.163/ Pln-3Dt.14/12/2011

1897 Urgent Work

164 Pune Improvements to NH-9 to Kunjirwadi Alandi MhatobachiTarde Shindawane road MDR 58 Km 8/00 to10/500Tal. Haveli, Dist. Pune

8000 No.NBD2011/C.R.164/ Pln-3Dt.14/12/2011

1275 Urgent Work

165 Satara Improvement to Kumbhroshi Shirwadi To Kasrud Hatlotto Dist.Ratnagiri Road MDR-68 Km.0/00 to 7/00Tal.M'war

13525 No.NBD2011/C.R.165/ Pln-3Dt.14/12/2011

2156 Urgent Work

166 Pune Improvements to Mundava Manjari Road MDR 34 Km4/00 to 5/00 Tal.Haveli Dist. Pune

8000 No.NBD2011/C.R.166/ Pln-3Dt.14/12/2011

1275 Urgent Work

167 Solapur Construction of Causeway on Mamdabad -Bobalad roadVR-250 at Ch. 0/200 near village Mamdabad,Tal:Mangalwedha, Dist:Solapur

2379 No.CE-Pune-NBD-2012/2/Dt.14/12/2012

379 Urgent Work

168 Akola Const. of Minor bridge over Nala on Dahigaon RamgaonMaisang MDR-13 Km 4/00 Tq Akola Distt Akola

3977 No-NBD 2012/C.R.1/ Pln-3Dt.02/01/2012

620 Urgent Work

169 Amravati Constn. Of Minor Bridge & C.C. Drain at ch. 153/950on Amravati Badnera road SH 242 A in Amravati city.(Malviya square) Tq. Amravati Distt. Amravati

8897 No-NBD 2012/C.R.2/ Pln-3Dt.02/01/2012

1387 Urgent Work

170 Bhandara Construction of Minor Bridge on Kondha Bhawad BelatiRoad MDR-21 in Km. 10/800

5824 No-NBD 2012/C.R.3/ Pln-3Dt.02/01/2012

908 Urgent Work

171 Buldhana Construction of 2 bridges on Warwat Ringanwadi roadVR 30 at 0/400 & 0/600 Tq.Sangrampur Dist Buldana

6500 No-NBD 2012/C.R.4/ Pln-3Dt.02/01/2012

1013 Urgent Work

172 Chandrapur Construction of 8 Nos of C. D. Works on ChiroliKawadpeth Chichala road in Km 0/00 to 8/00 (ODR 67)Tal.Mul, distt. Chandrapur

4242 No-NBD 2012/C.R.5/ Pln-3Dt.02/01/2012

661 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

173 Gadchiroli Construction of Major Bridge On Subhasnagar ApapalliGomani Road ( VR 4 ) At Ch. 11/600. Tahsil - Aheri ,District - Gadchiroli

15584 No-NBD 2012/C.R.6/ Pln-3Dt.02/01/2012

2429 Urgent Work

174 Gondia Construction of Major bridge on Asoli Nawegaon Road inkm 2/500 (VR-87) in Tah-Gondia

18700 No-NBD 2012/C.R.7/ Pln-3Dt.02/01/2012

2914 Urgent Work

175 Nagpur Widening & S.T. B.T. to Bokhara Lonara Gumthala roadKm. 0/00 to 3/00 (MDR-32)

16207 No-NBD 2012/C.R.8/ Pln-3Dt.02/01/2012

2526 Urgent Work

176 Wardha Improvement of Seldoh Sindhi Kandhali Road (MDR-17)in Km. 0/0 to 2/0

10642 No-NBD 2012/C.R.9/ Pln-3Dt.02/01/2012

1658 Urgent Work

177 Washim Improvement to Belkhed Maslapen Mangul zanak roadMDR-52 km.16/00 to 17/500 in Washim District.

7155 No-NBD 2012/C.R.10/ Pln-3Dt.02/01/2012

1115 Urgent Work

178 Yavatmal Construction of minor bridge on Gawandi approachroad to join State Highway 237 at chainage 3/400including approaches Taluka Babhulgaon DistrictYavatmal.

7696 No-NBD 2012/C.R.11/ Pln-3Dt.02/01/2012

1199 Urgent Work

179 Akola Improvement To Akola Goregoan Hingna Mazod RoadMDR-27 Km 8/00 to 10/00 Tq Akola Distt Akola

9017 No-NBD 2012/C.R.12/ Pln-3Dt.02/01/2012

1405 Urgent Work

180 Amravati Constn. of minor Bridge @ Ch.3/800 with approacheson Amravati Mini bye pass Road.SH 242 Tq. AmravatiDistt. Amravati

9996 No-NBD 2012/C.R.13/ Pln-3Dt.02/01/2012

1558 Urgent Work

181 Bhandara Improvement to Adyal Tirri Kesalwada road MDR 10Km,4/00 to 6/00

9500 No-NBD 2012/C.R.14/ Pln-3Dt.02/01/2012

1481 Urgent Work

182 Buldhana Const.Of Minor Bridge Sawarkhed Tejan HanwatkhedWaghora Road @ 1/800 ODR-80

5928 No-NBD 2012/C.R.15/ Pln-3Dt.02/01/2012

924 Urgent Work

183 Chandrapur C/o Minor Bridge at Baradkinhi Armori Road Km0/200 in Taluka Bramhapuri VR-144 distt. Chandrapur

8845 No-NBD 2012/C.R.16/ Pln-3Dt.02/01/2012

1378 Urgent Work

184 Gadchiroli Construction of one Minor Bridge on Armori AntaranjiRoad ODR-1 in Km.3/00 in . Gadchiroli Distt.TalukaArmori .

7486 No-NBD 2012/C.R.17/ Pln-3Dt.02/01/2012

1167 Urgent Work

185 Gondia Construction of Minor bridge on Karandali Dinkar NagarRoad in km 2/500 (ODR-151) in Tah-Arjuni/Mor

7762 No-NBD 2012/C.R.18/ Pln-3Dt.02/01/2012

1210 Urgent Work

186 Nagpur Construction of Minor Bridge on Khondali MasodDhotiwada Road( M.D.R. -9 ) in CH 10/700.

5000 No-NBD 2012/C.R.19/ Pln-3Dt.02/01/2012

779 Urgent Work

187 Wardha Improvement of Seldoh Sindhi Kandhali Road (MDR-17)in Km. 2/0 to 4/0

10710 No-NBD 2012/C.R.20/ Pln-3Dt.02/01/2012

1669 Urgent Work

188 Washim Improvement to Dhanora Shendurjana Waigaul roadkm.16/800 to 18/250 & 28/500 to 30/00 in WashimDistrict.MDR-41

11241 No-NBD 2012/C.R.21/ Pln-3Dt.02/01/2012

1752 Urgent Work

189 Yavatmal Construction of Minor Bridge in Km. 0/200 on SawangiKarmala Road Tq. Darwha Distt. Yavatmal

8744 No-NBD 2012/C.R.22/ Pln-3Dt.02/01/2012

1363 Urgent Work

190 Akola Improvement to Akola Mazod Babulgaon Ambashi RoadMDR-27 Km 23/00 to 26/00 Tq. Patur Distt. Akola

6614 No-NBD 2012/C.R.23/ Pln-3Dt.02/01/2012

1031 Urgent Work

191 Amravati Constn. of Submersible Bridge @ ch. 3/00 on PawaniWadala Road VR-12 (Clear Carriageway width 5.50m)Tq.Warud Distt. Amravati

4905 No-NBD 2012/C.R.24/ Pln-3Dt.02/01/2012

764 Urgent Work

192 Bhandara Improvement to Manegaon Palandur road MDR 20Km.5/300 to.7/350

10000 No-NBD 2012/C.R.25/ Pln-3Dt.02/01/2012

1558 Urgent Work

193 Buldhana Const.Of Minor Bridge on Motala Wadgaon Pophali roadMDR-14 @ Ch 3/200, 3/700,4/900,10/800, & 12/00

8000 No-NBD 2012/C.R.26/ Pln-3Dt.02/01/2012

1247 Urgent Work

194 Chandrapur Construction of minor bridge in Km 7/00 on VyahadKeroda Jamb (Bk) Pethgaon road ODR 67 Tal.Saoli,distt. Chandrapur

3884 No-NBD 2012/C.R.27/ Pln-3Dt.02/01/2012

605 Urgent Work

195 Gadchiroli Construction of one Minor Bridge on BhadbhidiHaladwahi Makepalli Made amgaon Road MDR No.18 inKm.No.12/800 in . Gadchiroli Distt.Taluka Chamorshi

13316 No-NBD 2012/C.R.28/ Pln-3Dt.02/01/2012

2075 Urgent Work

196 Gondia Construction of Minor bridge on Katangi Temani Roadin km 3/600 (ODR-88) in Tah-Gondia

6973 No-NBD 2012/C.R.29/ Pln-3Dt.02/01/2012

1087 Urgent Work

197 Nagpur Construction of Minor Bridge on Khondali MasodDhotiwada Road( M.D.R. -9 ) in CH 7/000.

5000 No-NBD 2012/C.R.30/ Pln-3Dt.02/01/2012

779 Urgent Work

198 Wardha Improvement to Ratnapur Adegaon Giroli Road inKm.15/0 to 16/900 (MDR-13)

12178 No-NBD 2012/C.R.31/ Pln-3Dt.02/01/2012

1898 Urgent Work

199 Washim Improvement to Kuksa Mangul zanak road km.3/00 to4/350 in Washim District.

6897 No-NBD 2012/C.R.32/ Pln-3Dt.02/01/2012

1075 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

200 Yavatmal Construction of Minor Bridge in Km. 2/00 to JawalaUmari Pathar Road Tq. Arni Distt. Yavatmal MDR-8

3718 No-NBD 2012/C.R.33/ Pln-3Dt.02/01/2012

579 Urgent Work

201 Akola Imp. To Choutta Karodi Jaulkhed Thokbardi road MDR-9 Km 9/00 to 11/100 Tq Akot Distt Akola

9618 No-NBD 2012/C.R.34/ Pln-3Dt.02/01/2012

1499 Urgent Work

202 Amravati Construction Minor Bridge in Km 3/800 on KholapurBorkhedi Aalangaon Kund road MDR-22 Tq. BhatkuliDistt. Amravati

6000 No-NBD 2012/C.R.35/ Pln-3Dt.02/01/2012

935 Urgent Work

203 Bhandara Improvement to Mohadi Andhalgaon Jamb road MDR 4Km.8/700 to 11/00

14513 No-NBD 2012/C.R.36/ Pln-3Dt.02/01/2012

2262 Urgent Work

204 Buldhana Improvement to Amdapur Janephal RoadMDR-22 In Ch11/200 to 12/800

6772 No-NBD 2012/C.R.37/ Pln-3Dt.02/01/2012

1055 Urgent Work

205 Chandrapur Construction of two RCW on Chikhali Bhadurna road(VR 11) at Ch 0/700 and 1/000 (Actual 1/700) Tah Mul

2907 No-NBD 2012/C.R.38/ Pln-3Dt.02/01/2012

453 Urgent Work

206 Gadchiroli Construction of one Minor Bridge on Wairagad KuradiPisewadadha Road ODR-5 in Km.13/200 in . GadchiroliDistt,Taluka Armori .

7531 No-NBD 2012/C.R.39/ Pln-3Dt.02/01/2012

1174 Urgent Work

207 Gondia Construction of Minor bridge on Kawalewada IsatolaSaharvani Road in km 3/200 (ODR-105) in Tah-Goregaon

6567 No-NBD 2012/C.R.40/ Pln-3Dt.02/01/2012

1023 Urgent Work

208 Nagpur Construction of Major Submerssible bridge across Nandriver on Sonegaon Bela Sirsi road MDR-29 in Km. 16/00Near village Pipra in Taluka Umred Distt. Nagpur.

31140 No-NBD 2012/C.R.41/ Pln-3Dt.02/01/2012

4853 Urgent Work

209 Wardha Improvement to Ratnapur Adegaon Giroli Road inKm.4/0 to 8/0 (MDR-13)

24987 No-NBD 2012/C.R.42/ Pln-3Dt.02/01/2012

3894 Urgent Work

210 Washim Improvement to Poti Mohari Khadi Dhamni roadkm.16/00 to 19/400 in Washim District.MDR-37

7349 No-NBD 2012/C.R.43/ Pln-3Dt.02/01/2012

1145 Urgent Work

211 Yavatmal Improvement to Umarkhed Dhanki road MDR-44 Km11/00 to 12/900 Tq.Umarkhed Dist.Yavatmal

5500 No-NBD 2012/C.R.44/ Pln-3Dt.02/01/2012

857 Urgent Work

212 Akola Improvement to Jamthi to Karli Road MDR-16 Km5/00 to 7/00 Tq. Murtizapur Distt. Akola

6433 No-NBD 2012/C.R.45/ Pln-3Dt.02/01/2012

1003 Urgent Work

213 Amravati Imp. To Achalpur Rasegaon Kolha road MDR 19 Km13/400 to 15/00 Tq- Achalpur Dist- Amravati

6148 No-NBD 2012/C.R.46/ Pln-3Dt.02/01/2012

958 Urgent Work

214 Bhandara Improvement Sihora Gobarwahi road MDR 16 km.6/800to 9/00

9789 No-NBD 2012/C.R.47/ Pln-3Dt.02/01/2012

1526 Urgent Work

215 Buldhana Improvement to Dongaon Madani Road MDR-44 In Ch0/00 to 2/700

10737 No-NBD 2012/C.R.48/ Pln-3Dt.02/01/2012

1673 Urgent Work

216 Chandrapur Construction of minor bridge in Km. 12/200 and14/400. on Tadali Yerur Shengaon Sonegaon road.Tal &distt. Chandrapur MDR-12

13492 No-NBD 2012/C.R.49/ Pln-3Dt.02/01/2012

2103 Urgent Work

217 Gadchiroli ST.& BT. to Bhadbhidi Haladwahi MakepalliMadeamgaon Road (MDR-18) in km. 9/400 to 14/00 inGadchiroli Distt.,Taluka Chamorshi

17188 No-NBD 2012/C.R.50/ Pln-3Dt.02/01/2012

2679 Urgent Work

218 Gondia Construction of Minor bridge on Kidangipar PangadiNilagondhi Sonekhari Road in km 22/200 (MDR-28) inTah-Gondia

6000 No-NBD 2012/C.R.51/ Pln-3Dt.02/01/2012

935 Urgent Work

219 Nagpur Construction of Major bridge across Krishna River onGumgaon Salaidhaba Takalghat road (S.H. 260 B) nearTakalghat village in Km. 31/500 Taluka Higna Distt.Nagpur.

23286 No-NBD 2012/C.R.52/ Pln-3Dt.02/01/2012

3629 Urgent Work

220 Wardha Improvement. to Hinganghat Kutki Arvi KachangaonRoad in Km.7/0 to 9/0 (MDR-30)

6147 No-NBD 2012/C.R.53/ Pln-3Dt.02/01/2012

958 Urgent Work

221 Washim Improvement to Rajgaon Ansing Ilkhi road km.23/00 to26/00 in Washim District.MDR-46

6300 No-NBD 2012/C.R.54/ Pln-3Dt.02/01/2012

982 Urgent Work

222 Yavatmal Construction of minor bridge on Hiwari Nakapardi Loniroad at chainage 4/400 MDR 12 Taluka - YavatmalDistrict - Yavatmal.

4570 No-NBD 2012/C.R.55/ Pln-3Dt.02/01/2012

712 Urgent Work

223 Akola Imp. To Kanheri Degaon Wadegaon Road MDR-29 Km3/00 to 5/500 Tq Patur Distt Akola

5029 No-NBD 2012/C.R.56/ Pln-3Dt.02/01/2012

784 Urgent Work

224 Amravati Imp. To Achalpur Rasegaon Kolha road MDR 19 Km0/00 to 3/400 Tq- Achalpur Dist- Amravati

10000 No-NBD 2012/C.R.57/ Pln-3Dt.02/01/2012

1558 Urgent Work

225 Bhandara Improvement to Shiindhpuri Shivnala Virli (kh)Chparala MDR 22 km.25/500 to 27/00

4347 No-NBD 2012/C.R.58/ Pln-3Dt.02/01/2012

677 Urgent Work

226 Buldhana Improvement to Adgaon Balapur road MDR 20 Km8/400 to 11/400

10000 No-NBD 2012/C.R.59/ Pln-3Dt.02/01/2012

1558 Urgent Work

227 Chandrapur Construction of High level submersible minor bridge inKm. 0/800 on Pawana Borda Warora Madheli road. TalWarora distt. Chandrapur MDR-2

5053 No-NBD 2012/C.R.60/ Pln-3Dt.02/01/2012

787 Urgent Work

228 Gondia Construction of Minor bridge on Morwahi GudamaRoad in km 2/00 (ODR-95) in Tah-Gondia

8860 No-NBD 2012/C.R.61/ Pln-3Dt.02/01/2012

1381 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

229 Nagpur Construction of Minor bridges on Sonegaon MohagaonKawatha road in Km. 3/00 Taluka Distt. Nagpur.

12000 No-NBD 2012/C.R.62/ Pln-3Dt.02/01/2012

1870 Urgent Work

230 Wardha Improvement. to Hinganghat Satefal Ladki Road inKm.5/0 to 7/0 (MDR-24)

10537 No-NBD 2012/C.R.63/ Pln-3Dt.02/01/2012

1642 Urgent Work

231 Washim Improvement to Rajgaon Ansing Ilkhi road km.5/00 to7/00 in Washim District.MDR-46

4125 No-NBD 2012/C.R.64/ Pln-3Dt.02/01/2012

643 Urgent Work

232 Yavatmal Construction of minor bridge in km. 28/00 on MardiMaregaon Nawargaon Rohapat road Tq. Maregaon Dist.Yavatmal.MDR-19

3141 No-NBD 2012/C.R.65/ Pln-3Dt.02/01/2012

490 Urgent Work

233 Akola Imp. To Khirkund Ruikhed Panaj Sawara Road MDR-6Km 16/000 to 18/00 Tq Akot Distt Akola

4792 No-NBD 2012/C.R.66/ Pln-3Dt.02/01/2012

747 Urgent Work

234 Amravati Imp. To Kharpi Sarfapur Brahmanwada (Thadi)Ghatladki Ashtagoan road MDR 29 Km 15/500 to18/600 Tq- Chandur Bazar Dist- Amravati

15467 No-NBD 2012/C.R.67/ Pln-3Dt.02/01/2012

2410 Urgent Work

235 Bhandara STBT to Paladi Koka Kardi road MDR 8 Km. 16/00to.18/500

6278 No-NBD 2012/C.R.68/ Pln-3Dt.02/01/2012

978 Urgent Work

236 Buldhana Improvement to Chikhali Khandala Ekalara BhorsaBhorsi Road MDR-31 In Ch 8/00 to 10/300

4986 No-NBD 2012/C.R.69/ Pln-3Dt.02/01/2012

777 Urgent Work

237 Chandrapur Construction of minor bridge in Km. 8/00 on TadaliYerur Shengaon Sonegaon road.Tal & distt. ChandrapurMDR-12

4399 No-NBD 2012/C.R.70/ Pln-3Dt.02/01/2012

686 Urgent Work

238 Gondia Construction of Minor bridge on Nawegaon (Kh) to IrriRoad in km 1/800 (VR-92) in Tah-Gondia

8690 No-NBD 2012/C.R.71/ Pln-3Dt.02/01/2012

1354 Urgent Work

239 Nagpur Improvement to B.T. Kamptee-Ghorpad-Lihigaon-Mahalgaon Road (MDR-19) in k.m. 2/100 to 3/705

8500 No-NBD 2012/C.R.72/ Pln-3Dt.02/01/2012

1325 Urgent Work

240 Wardha S.T.B.T. to Samudrapur Waigaon (Gond) DhamangaonRoad in Km. 10/0 to 12/0 (MDR-32)

6580 No-NBD 2012/C.R.73/ Pln-3Dt.02/01/2012

1025 Urgent Work

241 Washim Improvement to Washim Kata Kinhiraja roadkm.18/500 to 20/250 in Washim District. MDR-44

7378 No-NBD 2012/C.R.74/ Pln-3Dt.02/01/2012

1150 Urgent Work

242 Yavatmal Construction of Minor Bridge on Umari SawargaonChincholi Road at Ch. 2/00 Tq. Kalamb Distt. YavatmalMDR-14

6000 No-NBD 2012/C.R.75/ Pln-3Dt.02/01/2012

935 Urgent Work

243 Akola Imp. To Malegaon Danapur Soundala road MDR-1 Km3/00 to 5/00 Tq. Telhara Distt Akola

5052 No-NBD 2012/C.R.76/ Pln-3Dt.02/01/2012

787 Urgent Work

244 Amravati Improvement to Bhatkuli Nimboli Road MDR 36 Km5/00 to 8/00 Tq. Dhamangaon Rly Distt. Amravati

6610 No-NBD 2012/C.R.77/ Pln-3Dt.02/01/2012

1030 Urgent Work

245 Buldhana Improvement to Chikhali Sakegaon Road MDR-29 In Ch22/500 to 26/00

7156 No-NBD 2012/C.R.78/ Pln-3Dt.02/01/2012

1115 Urgent Work

246 Chandrapur Construction of minor bridge on Madheli Nagri road tojoin Chikani Khemjai Shegaon Ashta Chandankhedaroad near Kharwada village. Tal Warora distt.Chandrapur MDR-5

4046 No-NBD 2012/C.R.79/ Pln-3Dt.02/01/2012

631 Urgent Work

247 Gondia Construction of Minor bridge on Nawegaon Kholi Roadin km 0/100 (VR-116) in Tah-Arjuni/Mor

6157 No-NBD 2012/C.R.80/ Pln-3Dt.02/01/2012

960 Urgent Work

248 Nagpur Improvement to B.T. Kamptee-Kalmana Road(MDR-21)in k.m. 4/00 to 5/450

6500 No-NBD 2012/C.R.81/ Pln-3Dt.02/01/2012

1013 Urgent Work

249 Wardha S.T.B.T. to Seldoh Sindi Kandhali Road in Km. 12/0 to15/0 (MDR-17)

8046 No-NBD 2012/C.R.82/ Pln-3Dt.02/01/2012

1254 Urgent Work

250 Washim Improvement to Washim Kata Kinhiraja road km.7/800to 9/500 in Washim District.MDR-44

7500 No-NBD 2012/C.R.83/ Pln-3Dt.02/01/2012

1169 Urgent Work

251 Yavatmal Improvement to Borgaon Shivar Bhandari Belora roadVR-34 Km. 1/400 to 4/700 Tq. Arni. Distt. Yavatmal

9620 No-NBD 2012/C.R.84/ Pln-3Dt.02/01/2012

1499 Urgent Work

252 Akola Improvement to Mohada Amboda Akoli JahagirMahagaon Road MDR-5 Km 0/00 to 3/00 Tq. AkotDistt. Akoal

7245 No-NBD 2012/C.R.85/ Pln-3Dt.02/01/2012

1129 Urgent Work

253 Amravati Improvement to Bramhanwada thadi Sayawada AmbadaAshtgaon Road. MDR 29 Km 21/00 to 22/00 Tq.Morshi Distt. Amravati

5273 No-NBD 2012/C.R.86/ Pln-3Dt.02/01/2012

822 Urgent Work

254 Buldhana Improvement to Datala Dabhadi Padali Road InCh 2/470 to 5/00

5033 No-NBD 2012/C.R.87/ Pln-3Dt.02/01/2012

784 Urgent Work

255 Chandrapur Construction of minor bridge on Nagri KhambadaSakhari Pardi Sawari Khangaon to join State Highway233 in Km. 22/00 and 26/00. Tal Warora distt.Chandrapur

5959 No-NBD 2012/C.R.88/ Pln-3Dt.02/01/2012

929 Urgent Work

256 Gondia Construction of Minor bridge on Pangadi Chutiya MurriRoad in km 11/400 (MDR-27) in Tah-Gondia

4497 No-NBD 2012/C.R.89/ Pln-3Dt.02/01/2012

701 Urgent Work

257 Nagpur Improvement to Bhishnur Siganrkheda-Khandala-Sawargaon Pipla-Nanda Gomukha(MDR-7) Km. 7/00 to 10/00

5000 No-NBD 2012/C.R.90/ Pln-3Dt.02/01/2012

779 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

258 Wardha S.T.B.T. to Wardha Barbadi Goji Road in Km. 8/0 to12/0 & 14/500 to 16/0 (MDR-21)

16038 No-NBD 2012/C.R.91/ Pln-3Dt.02/01/2012

2499 Urgent Work

259 Yavatmal Improvement to Moha Madni Naigaon Road MDR-11Km. 3/800 to 6/400 District - Yavatmal.

9559 No-NBD 2012/C.R.92/ Pln-3Dt.02/01/2012

1490 Urgent Work

260 Akola Imp. To Nimkarda Hatrun Borgaon Vairale road MDR-10 Km 22/00 to 25/00 Tq. Balapur Distt Akola

9092 No-NBD 2012/C.R.93/ Pln-3Dt.02/01/2012

1417 Urgent Work

261 Amravati Improvement to Chandur Baggi Rajura Road MDR 50Km. 3/500 to 6/00 in Amravati District

6482 No-NBD 2012/C.R.94/ Pln-3Dt.02/01/2012

1010 Urgent Work

262 Buldhana Improvement to Datala Umali Warkhed Tarwadi roadMDR 11 km.18/00 to 20/500 Tq.Malkapur DistBuldana

10000 No-NBD 2012/C.R.95/ Pln-3Dt.02/01/2012

1558 Urgent Work

263 Chandrapur Construction of two minor bridge on Rajura MhatraGauri Pawani road in Km. 9/300 and 9/900. Tal Rajuradistt. ChandrapurMDR-15

7031 No-NBD 2012/C.R.96/ Pln-3Dt.02/01/2012

1096 Urgent Work

264 Gondia Improvement to Wadegaon Satlwada Bopabodi SoundadRoad in km 34/400 to 35/400 (MDR-31) Tah-SadakArjuni

6178 No-NBD 2012/C.R.97/ Pln-3Dt.02/01/2012

963 Urgent Work

265 Nagpur Improvement to Kuhi Pandegaon Rajola Road MDR-26Km. 5/00 to 9/00 Taluka Kuhi ,Distt. Nagpur

12080 No-NBD 2012/C.R.98/ Pln-3Dt.02/01/2012

1883 Urgent Work

266 Wardha S.T.B.T. to Wardha Waifad Rasulabad Sorta Road inKm. 2/500 to 6/500 (MDR-10) Taluka Wardha DistWardha

22058 No-NBD 2012/C.R.99/ Pln-3Dt.02/01/2012

3438 Urgent Work

267 Yavatmal Improvement to Gawandi approach road to joinS.H.Way No.237 Km. 0/0 to 3/00 MDR-14 Taluka -Babulgaon District - Yavatmal.

9104 No-NBD 2012/C.R.100/ Pln-3 Dt.02/01/2012

1419 Urgent Work

268 Akola Widening and Strengthing to Murtizapur BallarkhedRoad MDR-15 Km 7/00 to 9/650 Tq. BarshitakliDistt. Akola

13025 No-NBD 2012/C.R.101/ Pln-3 Dt.02/01/2012

2030 Urgent Work

269 Amravati Improvement to Dhanora Gurao Papal Tighara PhataRoad MDR26 Km 10/00 to 12/00 Tq. Nandgaon Kh.Distt. Amravati

5970 No-NBD 2012/C.R.102/ Pln-3 Dt.02/01/2012

930 Urgent Work

270 Buldhana Improvement to Dhad Chandol Irala Road MDR-25 InCh 8/000 to 11/500

7476 No-NBD 2012/C.R.103/ Pln-3 Dt.02/01/2012

1165 Urgent Work

271 Chandrapur Improvement of Tadali Yerur Shegaon Usegaon Dhanorain Km. 26/500 to 27/500 (MDR-12) Tal & distt.Chandrapur

2882 No-NBD 2012/C.R.104/ Pln-3 Dt.02/01/2012

449 Urgent Work

272 Gondia Improvement to Kamtha Amgaon Road in km 16/00 to20/00 (MDR-42) Tah-Amgaon

24050 No-NBD 2012/C.R.105/ Pln-3 Dt.02/01/2012

3748 Urgent Work

273 Nagpur Improvement to Makardhokada Hevti Udasa Road MDR-27 Km. 36/100 to 38/100 in Umred Taluka Distt.Nagpur.

8971 No-NBD 2012/C.R.106/ Pln-3 Dt.02/01/2012

1398 Urgent Work

274 Wardha Widening & S.T.B.T. to Umari Digras Mandwa (MDR-34)Km. 10/0 to 11/500 Taluka Wardha Dist Wardha

11898 No-NBD 2012/C.R.107/ Pln-3 Dt.02/01/2012

1854 Urgent Work

275 Yavatmal Improvement to Ghonsa Jamani Patan road km. 19/00to 21/00 MDR-24 Tq. Zari Jamani Dist.Yavatmal.

9728 No-NBD 2012/C.R.108/ Pln-3 Dt.02/01/2012

1516 Urgent Work

276 Amravati Improvement to Dharni Dakana Selu road MDR 9 Km4/00 to 7/00 Tq- Dharni Distt. - Amravati

7303 No-NBD 2012/C.R.109/ Pln-3 Dt.02/01/2012

1138 Urgent Work

277 Buldhana Improvement to Khandvi Bhendwal Paturda Ukali roadMDR 2 km 12/400 to 14/00 Tq.Jalgaon J Distt Buldana

5000 No-NBD 2012/C.R.110/ Pln-3 Dt.02/01/2012

779 Urgent Work

278 Chandrapur Improvement of Madheli Nagri road to join ChikaniTembhurda Khemjai Shegaon Ashta Chandankhedaroad.Section- Kharwad to Ukharda in Km. 6/00 to8/00. MDR-1 Tal Warora distt. Chandrapur

4000 No-NBD 2012/C.R.111/ Pln-3 Dt.02/01/2012

623 Urgent Work

279 Gondia Improvement to Kudawa Hiwara Ratnara DhapewadaRoad in km 7/00 to 8/500 in (MDR-26) Tah-Gondia

10045 No-NBD 2012/C.R.112/ Pln-3 Dt.02/01/2012

1565 Urgent Work

280 Nagpur Improvement to Narkhed-Ghubadmeth Nagpur road(MDR-6) Km. 15/00 to 18/00

5000 No-NBD 2012/C.R.113/ Pln-3 Dt.02/01/2012

779 Urgent Work

281 Wardha Widening & S.T.B.T. to Wardha Waifad Rasulabad Sorta(MDR-10) Km. 11/800 to 13/00 & 18/00 to 19/00Taluka Wardha Dist Wardha

15649 No-NBD 2012/C.R.114/ Pln-3 Dt.02/01/2012

2439 Urgent Work

282 Yavatmal Improvement to Ghonsara Hiwalani road MDR-30 Km5/00 to 9/00 Tq.Mahagaon Dist.Yavatmal

9000 No-NBD 2012/C.R.115/ Pln-3 Dt.02/01/2012

1403 Urgent Work

283 Amravati Improvement to Kakada kasbegavhan Kamalpur roadMDR-16 km 18/00 to 20/00 Tq. Anjangaon Distt.Amravati

7734 No-NBD 2012/C.R.116/ Pln-3 Dt.02/01/2012

1205 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

284 Buldhana Improvement to Lonar Kingaon Jattu Road MDR-47 InCh 0/00 to 1/00 , 2/00 to 3/00

4347 No-NBD 2012/C.R.117/ Pln-3 Dt.02/01/2012

677 Urgent Work

285 Chandrapur Improvement to Dewai Approach road (ODR 99) Km4/500 to 6/500 Tah Ballarpur Distt. Chandrapur

8538 No-NBD 2012/C.R.118/ Pln-3 Dt.02/01/2012

1331 Urgent Work

286 Gondia Improvement to Tirora Bodalkasa Goregaon Road in km15/800 to 18/00 (MDR-30) Tah-Tirora

13500 No-NBD 2012/C.R.119/ Pln-3 Dt.02/01/2012

2104 Urgent Work

287 Nagpur Improvement to Narkhed-Ghubadmeth Nagpur road(MDR-6) Km. 4/00 to 7/00

6000 No-NBD 2012/C.R.120/ Pln-3 Dt.02/01/2012

935 Urgent Work

288 Yavatmal Improvement to Khadki Dhanora Sawangi Yeoti roadMDR-16 km. 3/00 to 4/600 Tq. Ralegaon Dist.Yavatmal.

6870 No-NBD 2012/C.R.121/ Pln-3 Dt.02/01/2012

1071 Urgent Work

289 Amravati Improvement to Morchud Fata to Udapur Chandas RoadMDR 48 in Km 3/400 to 5/400 Tq.Warud Distt.Amravati

8675 No-NBD 2012/C.R.122/ Pln-3 Dt.02/01/2012

1352 Urgent Work

290 Buldhana Improvement to Motala Kothali Warwand Road MDR-16In Ch 7/00 to 9/00

5000 No-NBD 2012/C.R.123/ Pln-3 Dt.02/01/2012

779 Urgent Work

291 Chandrapur Improvement to Kolsa Ajaypur Chichapalli JunonaChandrapur road (MDR 21) in Km 35/00 to 40/00(propose 38/00 to 40/00) Tal & distt. Chandrapur

7565 No-NBD 2012/C.R.124/ Pln-3 Dt.02/01/2012

1179 Urgent Work

292 Nagpur S.T.B.T. to Jamgaion Thadipaoni Nagpur road (MDR-1)Km. 8/00 to 10/00

4000 No-NBD 2012/C.R.125/ Pln-3 Dt.02/01/2012

623 Urgent Work

293 Yavatmal Improvement to Khairy Kumbha Karanwadi road km.0/0 to 2/00 Tq. Maregaon Dist.Yavatmal.

5000 No-NBD 2012/C.R.126/ Pln-3 Dt.02/01/2012

779 Urgent Work

294 Amravati Improvement to Nerpingalai to Satargaon road VR-165km 0/00 to 2/300 Tq. Morshi Distt. Amravati

5000 No-NBD 2012/C.R.127/ Pln-3 Dt.02/01/2012

779 Urgent Work

295 Buldhana Improvement to Nimgaon Narkhed road MDR 8km.46/500 to 50/500 Tq.Nandura Dist Buldana

9042 No-NBD 2012/C.R.128/ Pln-3 Dt.02/01/2012

1409 Urgent Work

296 Chandrapur Improvement with Widening to Gadchandur Naukariroad (MDR-13) in Km. 0/0 to 3/00. Tal Korpana distt.Chandrapur

6687 No-NBD 2012/C.R.129/ Pln-3 Dt.02/01/2012

1042 Urgent Work

297 Nagpur STBT to Khapa Badegaon Sironji Nagalwadi RoadMDR 17, from Km. 18/00 to 21/500 In Taluka Saoner, District Nagpur.

9135 No-NBD 2012/C.R.130/ Pln-3 Dt.02/01/2012

1424 Urgent Work

298 Yavatmal Improvement to Ner Dolhari road MDR-5 Km. 19/00 to22/00 Tq. Darwha Distt. Yavatmal

9351 No-NBD 2012/C.R.131/ Pln-3 Dt.02/01/2012

1457 Urgent Work

299 Amravati Improvement to Purna Nagar Nirul Wathoda Kholapurroad MDR-20 km 0/00 to 1/500 Tq. Bhatkuli Distt.Amravati

5810 No-NBD 2012/C.R.132/ Pln-3 Dt.02/01/2012

905 Urgent Work

300 Buldhana Improvement to Pimpalgaon Raja Kalgaon Bhalegaonroad MDR 18 km 10/0 to 12/700 Tq.Khamgaon DisttBuldana

10000 No-NBD 2012/C.R.133/ Pln-3 Dt.02/01/2012

1558 Urgent Work

301 Chandrapur STBT to Kinhi - Jugnala - Jawarabodi Mendki Road(ODR - 91) KM 7/00 to 10/00 Tal.Bramhapuri, distt.Chandrapur

6088 No-NBD 2012/C.R.134/ Pln-3 Dt.02/01/2012

949 Urgent Work

302 Nagpur STBT to Sawali-palsad-Kem Road Km. 7/00 to 8/00MDR-19

4219 No-NBD 2012/C.R.135/ Pln-3 Dt.02/01/2012

658 Urgent Work

303 Yavatmal Improvement to Sawanga Chirkuta Netajinagar roadMDR-8 Km 10/800 to 13/200 Tq.Digras Dist.Yavatmal

7000 No-NBD 2012/C.R.136/ Pln-3 Dt.02/01/2012

1091 Urgent Work

304 Amravati Improvement to Purna Nagar Nirul WathodaRunmochan road MDR-20 km 31/00 to 32/600 Tq.Bhatkuli Distt. Amravati

7038 No-NBD 2012/C.R.137/ Pln-3 Dt.02/01/2012

1097 Urgent Work

305 Buldhana Improvement to Sakherda Mera Andhera Road. MDR-34 Km 0/700 to 4/400

8575 No-NBD 2012/C.R.138/ Pln-3 Dt.02/01/2012

1336 Urgent Work

306 Nagpur STBT to Sawargaon Pipla Nandagomukh UmariKelwad Road MDR 7, from Km. 31/300 to 33/300 &34/900 to 38/00 in Taluka Saoner, District Nagpur.

11995 No-NBD 2012/C.R.139/ Pln-3 Dt.02/01/2012

1869 Urgent Work

307 Yavatmal Improvement to Umari Sawargaon Chincholi road MDR-14 Km. 7/00 10/00 Tq. Kalamb Distt. Yavatmal

12556 No-NBD 2012/C.R.140/ Pln-3 Dt.02/01/2012

1957 Urgent Work

308 Amravati Improvement to Rahatgaon Ramgaon road V.R. 104Km. 1/500 to 2/600 Tq. Amravati Dist. Amravati

4143 No-NBD 2012/C.R.141/ Pln-3 Dt.02/01/2012

646 Urgent Work

309 Buldhana Improvement to Shendurjan - Daregaon - MeraRoad.MDR-37 Km 22/100 to 24/500

7387 No-NBD 2012/C.R.142/ Pln-3 Dt.02/01/2012

1151 Urgent Work

310 Nagpur Wideneing to B.T. to Mouda Lapka Dhamangaon Road(MDR- 37) in km. 0/0 to 2/00

6231 No-NBD 2012/C.R.143/ Pln-3 Dt.02/01/2012

971 Urgent Work

311 Yavatmal Construction of minor bridge in km. 12/00 on SurdapurMatharjun Sibla road Tq. Zari Jamani Dist. YavatmalMDR-19

2682 No-NBD 2012/C.R.144/ Pln-3 Dt.02/01/2012

418 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

312 Amravati Improvement to Talni Rajurwadi Road MDR 41 in Km1/00 to 3/00 Tq. Morshi Distt. Amravati

7473 No-NBD 2012/C.R.145/ Pln-3 Dt.02/01/2012

1165 Urgent Work

313 Buldhana Widening & BT to Asalgaon Palshi Supo road MDR 4 km0/00 to 2/00

8592 No-NBD 2012/C.R.146/ Pln-3 Dt.02/01/2012

1339 Urgent Work

314 Nagpur Widening & B.T. to Parshiwani-Nawegaon-Khiri Road(MDR-18) in k.m. 6/500 to 7/850

10000 No-NBD 2012/C.R.147/ Pln-3 Dt.02/01/2012

1558 Urgent Work

315 Yavatmal Improvement to Yelgunda Malkheda(Bk) PimpariChikani road MDR-4 Km 6/700 to 8/000 Tq.NerDist.Yavatmal

4543 No-NBD 2012/C.R.148/ Pln-3 Dt.02/01/2012

708 Urgent Work

316 Amravati Improvement to Warkhed Marda Anjansingi road MDR-39 Km 13/00 to 16/500 Tq.Teosa Distt. Amravati

7000 No-NBD 2012/C.R.149/ Pln-3 Dt.02/01/2012

1091 Urgent Work

317 Nagpur Widening & B.T. to Ramtek-Musewadi Road in k.m.0/00 to 1/550 MDR-22

5999 No-NBD 2012/C.R.150/ Pln-3 Dt.02/01/2012

935 Urgent Work

318 Yavatmal Widening & Improvement to Gaul Mudana Dharmoharoad MDR-38 Km 19/00 to 20/700 Tq.MahagaonDist.Yavatmal

7500 No-NBD 2012/C.R.151/ Pln-3 Dt.02/01/2012

1169 Urgent Work

319 Amravati Improvement to Asara Jasapur Khalkoni Advi Hartalaroad MDR-4 km 6/800 to 8/800 Tq. Bhatkuli Distt.Amravati

6393 No-NBD 2012/C.R.152/ Pln-3 Dt.02/01/2012

996 Urgent Work

320 Nagpur Wideneing to S.T.B.T. to Nerala-Dudhala Road ( MDR-38) in km. 1/600 to 2/700

6144 No-NBD 2012/C.R.153/ Pln-3 Dt.02/01/2012

958 Urgent Work

321 Yavatmal Widening & Improvement to Khandala Deothana Palsiroad MDR-36 Km 19/00 to 21/600 Tq.PusadDist.Yavatmal

11000 No-NBD 2012/C.R.154/ Pln-3 Dt.02/01/2012

1714 Urgent Work

322 Amravati Improvement to Daryapur Ramtirth karatkhedaMhaisang road MDR-13 km 0/00 to 1/00 & 8/500 to10/00 Tq. Daryapur Distt. Amravati

8340 No-NBD 2012/C.R.155/ Pln-3 Dt.02/01/2012

1300 Urgent Work

323 Nagpur Widening and Stregthening to Butibori TakalghatKanholibara Adegaon Bazargaon Road MDR 33Km7/300 to 9/0 in Hingna Taluka, Distt- Nagpur.

11077 No-NBD 2012/C.R.156/ Pln-3 Dt.02/01/2012

1726 Urgent Work

324 Yavatmal Widening & Improvement to Mulawa Shembalpimpriroad MDR-37 Km 5/500 to 7/500 Tq.UmarkhedDist.Yavatmal

7500 No-NBD 2012/C.R.157/ Pln-3 Dt.02/01/2012

1169 Urgent Work

325 Amravati Constn. Of High level causeway in Km 32/200 onDharni Diya Bairagad Rangubeli road MDR 3 in Tq.-Dharni Distt. - Amravati

2332 C.E.P.W.R. AMT LTR NOD2(1)/AA/AMT/NAB 17 /115 / DT 7.01.2012

363 Urgent Work

326 Chandrapur Construction of minor bridge on Madheli Nagri road tojoin Chikani Tembhurda Khemjai Shegaon AshtaChandankheda road in Km. 29/200. Tal Warora distt.Chandrapur MDR-5

2099 No.CE-Nagpur-NBD-2012/4/Dt.02/01/2012

327 Urgent Work

327 Ahmednagar STBT to Kashti Kharatwadi Anandwadi Pedgaon MDR77 km 9/00 to 13/00 Taluka- Shrigonda

8217 No.NBD-2012/C.R.158/ Pln-3 Dt. 22/02/2012

1310 Urgent Work

328 Aurangabad Improvement to SH-60 to Kaigaon - Galnimb -Bhivdhnora km 0/0 to 3/700 Road ODR-75

8500 No.NBD-2012/C.R.159/ Pln-3 Dt. 22/02/2012

1633 Urgent Work

329 Beed Improvement to Waki Kada Dongargan DadegaonDeolali MDR-5 Km. 29/00 to 32/200 Tq. AshtiDist.Beed

6000 No.NBD-2012/C.R.160/ Pln-3 Dt. 22/02/2012

1153 Urgent Work

330 Dhule Improvement to SH-13 Kudashi Bopkhel ChivatibariRoad MDR-73 Km. 8/00 to 10/00 Tal.Sakri, Dist.Dhule

4716 No.NBD-2012/C.R.161/ Pln-3 Dt. 22/02/2012

752 Urgent Work

331 Hingoli Imp. to Jaipur Veltura Road MDR-75, Km.17/800 to18/300 Tq.Sengaon Dist.Hingoli

2814 No.NBD-2012/C.R.162/ Pln-3 Dt. 22/02/2012

541 Urgent Work

332 Jalgaon Improvement with widening to Amalner Dheku roadM.D.R.-49 km. 11/300 to 14/00 Tal Amalner Dist.Jalgaon

7192 No.NBD-2012/C.R.163/ Pln-3 Dt. 22/02/2012

1146 Urgent Work

333 Jalna Improvement to Deothana Uswad Mantha Idoli Patodato Dist. border road MDR-13 km 41/600 to 44/00 Dist.Jalna

5119 No.NBD-2012/C.R.164/ Pln-3 Dt. 22/02/2012

983 Urgent Work

334 Latur Improvement to Kumtha -Shivankhed road MDR-40 km10/00 to 12/500 in Ahmedpur Taluka and Dist.Latur

7192 No.NBD-2012/C.R.165/ Pln-3 Dt. 22/02/2012

1382 Urgent Work

335 Nanded Improvements to Markhel-Takali- Malegaon MDR- 65Dist Nanded Tq DegloorKm 3/00 to 4/500(3/00 to5/000)

7081 No.NBD-2012/C.R.166/ Pln-3 Dt. 22/02/2012

1360 Urgent Work

336 Nandurbar Improvement to Mahalkadu to Bhardu Road MDR 65Km 16/00 to 20/200 Tal Navapur Dist. Nandurbar

7374 No.NBD-2012/C.R.167/ Pln-3 Dt. 22/02/2012

1175 Urgent Work

337 Nashik Improvement to Borgaon Chankapur-Abhona -KolhapurPhata Road MDR-7(Section 22/00 to 24/00Dattanagarto Abhona)

4000 No.NBD-2012/C.R.168/ Pln-3 Dt. 22/02/2012

638 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

338 Nashik Improvements to Ahurli to Shevgedang road MDR-59Km.16/400 to 17/400 Tal-Igatpuri Dist-Nashik

5248 No.NBD-2012/C.R.169/ Pln-3 Dt. 22/02/2012

836 Urgent Work

339 Osmanabad Imp.to New SH to Khed Khamgaon Road MDR-15 Km8/00 to 10/00 Tq. Dist. Osmanabad.

4091 No.NBD-2012/C.R.170/ Pln-3 Dt. 22/02/2012

786 Urgent Work

340 Parbhani Improvement to Pachlegaon Niwali Walur Rajwadi toSelu Road MDR-70 km 20/0-22/00 Dist.Parbhani

8791 No.NBD-2012/C.R.171/ Pln-3 Dt. 22/02/2012

1689 Urgent Work

341 Raigad Improvements to Roha to Tambadi road, ODR-61, Km.0/0 to 4/850, Tal. Roha, Dist. Raigad.

8000 No.NBD-2012/C.R.172/ Pln-3 Dt. 22/02/2012

1275 Urgent Work

342 Ratnagiri Improvement to Hativale Juvwathi Upale Road Km1/700 to 3/000 MDR-63 Taluka Rajapur DistrictRatnagiri.

3573 No.NBD-2012/C.R.173/ Pln-3 Dt. 22/02/2012

570 Urgent Work

343 Sindhudurg Reconstruction of Minor Bridge in place of weak andNarrow submersible slab drain on Sangave NardaveRoad MDR - 16 in Km 4/045 Tal Kankavli, Dist.Sindhudurg.

7012 No.NBD-2012/C.R.174/ Pln-3 Dt. 22/02/2012

1118 Urgent Work

344 Thane Widening nd Strengthening and Black topping to KalyanHajimalang Road MDR 62 km.0/600 to 13/300(Km.11/800 to 13/300) in Ambernath Tal., Dist Thane

13580 No.NBD-2012/C.R.175/ Pln-3 Dt. 22/02/2012

2165 Urgent Work

345 Ahmednagar Improvements to Bavi Nannaj road MDR 84 km 13/200to 17/100 ( Actual km 13/200 to 14/490) Tal Jamkhed

2599 No.NBD-2012/C.R.176/ Pln-3 Dt. 22/02/2012

414 Urgent Work

346 Ahmednagar STBT to Khandke Koudgaon Pargaon Bhatodi MandvaShiradhon road MDR 57 km 24/800 to 26/600 ( Actualkm 24/800 to 26/200)Tal Nagar

3625 No.NBD-2012/C.R.177/ Pln-3 Dt. 22/02/2012

578 Urgent Work

347 Aurangabad Improvement to SH-16 to Lakhni - Mandki Road 0/0 to1/500 MDR-66 Tq. Vaijapur Dist. Aurangabad

6394 No.NBD-2012/C.R.178/ Pln-3 Dt. 22/02/2012

1228 Urgent Work

348 Beed Imp to Waghal Dhanora Akola Road Km 8/00 to 10/200MDR-47 Tq.Ambajogai Dist.Beed

4000 No.NBD-2012/C.R.179/ Pln-3 Dt. 22/02/2012

768 Urgent Work

349 Dhule Improvement to Kondaibari Pinjarzadi Valhave VitaveRoad MDR-60 Km. 12/500 to 15/00 Tal. Sakri,Dist.Dhule

5468 No.NBD-2012/C.R.180/ Pln-3 Dt. 22/02/2012

872 Urgent Work

350 Hingoli Imp. to Jambharun Tanda to Jambharun Andha MDR-74 Km.1/500 to 2/500 including Minor Bridge nearPusegaon village at ch. 11/200 Tq.Sengaon Dist. Hingoli

11558 No.NBD-2012/C.R.181/ Pln-3 Dt. 22/02/2012

2220 Urgent Work

351 Jalgaon Improvement including widening to Parola RajwadDharangaon road MDR-47 km. 12/00 to 14/00 TalParola

5567 No.NBD-2012/C.R.182/ Pln-3 Dt. 22/02/2012

887 Urgent Work

352 Jalna Improvement to Rani Unchegaon ChapadgaonKaradgaon Ranjani Rly. Stn. road MDR-25 km 12/00 to14/00 Dist. Jalna

5378 No.NBD-2012/C.R.183/ Pln-3 Dt. 22/02/2012

1033 Urgent Work

353 Latur Improvement to Kingaon -Karepur Road MDR -19 Km11/00 to 13/00 MDR-19 in Ahmedpur Taluka andDist.Latur

4910 No.NBD-2012/C.R.184/ Pln-3 Dt. 22/02/2012

943 Urgent Work

354 Nanded Improvements to kharab-khandgaon-Chandola-Mandalapur-pala-jahur thana road Dist Nanded TqMukhed MDR- 61 Km 2/00 to 4/00

11446 No.NBD-2012/C.R.185/ Pln-3 Dt. 22/02/2012

2199 Urgent Work

355 Nandurbar Improvement to Navapur to Gadad Road MDR 67 Km.2/00 to 4/00 Tal Navapur Dist. Nandurbar.

5913 No.NBD-2012/C.R.186/ Pln-3 Dt. 22/02/2012

942 Urgent Work

356 Nashik Improvement to Kanashi-Mohbari Pimple Road MDR-6( 0/00 to 2/00 Tal-Kalwan Dist-Nashik Section Kanashito Gopalkhadi)

4000 No.NBD-2012/C.R.187/ Pln-3 Dt. 22/02/2012

638 Urgent Work

357 Nashik Constructing S.H.21 Indore Ambewadi KurungwadiJamunde Govode Bhauli Igatpuro Road Km 26/00 to31/00 MDR-56 Tal. Igatpuri Dist. Nashik.

6000 No.NBD-2012/C.R.188/ Pln-3 Dt. 22/02/2012

956 Urgent Work

358 Osmanabad Imp. to NH-211 to Yedshi Sonegaon Bhansagaon RoadMDR-31 Km 7/00 to 9/00 Tq. Dist. Osmanabad.

4062 No.NBD-2012/C.R.189/ Pln-3 Dt. 22/02/2012

780 Urgent Work

359 Parbhani Improvement to Pedgaon Aland Road MDR-62 km21/600- 22/900 Dist.Parbhani

6604 No.NBD-2012/C.R.190/ Pln-3 Dt. 22/02/2012

1269 Urgent Work

360 Raigad Widening & strengthening to Shedung Belavali RoadMDR-8 Km. 6/500 to 7/500

5000 No.NBD-2012/C.R.191/ Pln-3 Dt. 22/02/2012

797 Urgent Work

361 Ratnagiri Improvement to Watul Kondtiware Soundal AdwaliFufere Angale Road MDR-59 Km 14/300 to 17/000Taluka Rajapur District Ratnagiri.

5550 No.NBD-2012/C.R.192/ Pln-3 Dt. 22/02/2012

885 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

362 Sindhudurg Improvements and Black topping to KharepatanKunkavan Velgive Shiragaon road M.D.R. 6 Km 24/250to 27/250 Tal Deogad Dist- Sindhudurg

5991 No.NBD-2012/C.R.193/ Pln-3 Dt. 22/02/2012

955 Urgent Work

363 Thane Strengthening and Black topping to Hajimalang wadi toKumbharli Road MDR 62 km.13/300 to 16/000 (Part14/500 to 16/00) in Ambernath Tal., Dist Thane

12900 No.NBD-2012/C.R.194/ Pln-3 Dt. 22/02/2012

2056 Urgent Work

364 Aurangabad Improvements to Chittepimpalgaon Pimpri Raja AdgaonKawadgaon Road MDR-53 Km 8/400 to 10/00 and12/400 to 13/250 Tq and Dist Aurangabad

7531 No.NBD-2012/C.R.195/ Pln-3 Dt. 22/02/2012

1447 Urgent Work

365 Beed Imp to Bardapur Hatola Road Km 0/00 to 2/00 MDR-46Tq.Ambajogai Dist.Beed

4000 No.NBD-2012/C.R.196/ Pln-3 Dt. 22/02/2012

768 Urgent Work

366 Dhule Widening of Dhule Vadjai Saundane Babhulwadi RoadMDR-42 Km. 8/00 to 9/700 and Construction of MinorBridge @ Ch. 8/200 Tal. & Dist. Dhule

4997 No.NBD-2012/C.R.197/ Pln-3 Dt. 22/02/2012

796 Urgent Work

367 Hingoli Imp. to Parli to Bori Sawant MDR-36 km. 3/00 to 5/00with C.D.work Tq.Basmath Dist.Hingoli

10000 No.NBD-2012/C.R.198/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

368 Jalgaon Improvements to Mundane Shirasmani ChorwadAnchalgaon road MDR-36 km. 2/00 to 3/500 Tal Parola

3677 No.NBD-2012/C.R.199/ Pln-3 Dt. 22/02/2012

586 Urgent Work

369 Jalna STBT Banegaon Rui SH-174 to SH-30 to Gangachincholi MDR-24 11\00 to 13\400

6371 No.NBD-2012/C.R.200/ Pln-3 Dt. 22/02/2012

1224 Urgent Work

370 Latur Improvement to Atola -Ujlamb-Rohina- Her road MDR-46 km 6/500 to 10/800 in Chakur taluka and Dist.Latur

9570 No.NBD-2012/C.R.201/ Pln-3 Dt. 22/02/2012

1838 Urgent Work

371 Nanded Improvements to Kurla Daithna Pokharni Goul AmbulgaBori Kalka Mangnali Pethwadaj Gonar Yellur MasalgaNarnalli up to state Border MDR- 44 Km 25/500 to26/00 and 28/00 to 30/00 Dist Nanded Tq Kandhar(29/700 to 32/500)

8706 No.NBD-2012/C.R.202/ Pln-3 Dt. 22/02/2012

1672 Urgent Work

372 Nandurbar Improvement to Khandbara Natavad Pimplod Road MDR61 Km. 18/00 to 20/00 Tal & Dist. Nandurbar

6045 No.NBD-2012/C.R.203/ Pln-3 Dt. 22/02/2012

964 Urgent Work

373 Nashik Improvement to Kalwan Otur Mulanebari Road ( MDR-4K.M.47/00 to 48/00 Tal-Kalwan Dist-Nashik )

3470 No.NBD-2012/C.R.204/ Pln-3 Dt. 22/02/2012

553 Urgent Work

374 Nashik Improvement to Sawali Sakheda Road MDR 49, Km20/00 to 23/00 & 27/00 to 29/00 Tal Niphad DistNashik

10000 No.NBD-2012/C.R.205/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

375 Osmanabad Imp. to Kakarmba Honala Murta Horti Kialj MDR-36 Km16/00 to 1800 Tq. Tuljapur Dist. Osmanabad.

4000 No.NBD-2012/C.R.206/ Pln-3 Dt. 22/02/2012

768 Urgent Work

376 Parbhani Imp.to Dharasur Mairalsawangi Khali toSH-217 RoadMDR-57 km 6/400 to 8/700 Dist.Parbhani

11000 No.NBD-2012/C.R.207/ Pln-3 Dt. 22/02/2012

2113 Urgent Work

377 Raigad Widening & strengthening to Shedung Belavali RoadMDR-8 Km. 7/500 to 9/00

7500 No.NBD-2012/C.R.208/ Pln-3 Dt. 22/02/2012

1195 Urgent Work

378 Ratnagiri Improvements and B.T. to Lanja Majal Jawade IsawaliPanore Road MDR-54 Km 12/300 to 14/600 TalukaLanja District Ratnagiri.

5471 No.NBD-2012/C.R.209/ Pln-3 Dt. 22/02/2012

872 Urgent Work

379 Sindhudurg Improvements and Black topping to Wagde HalwalKalsuli Road M.D.R. 45, Km 0/00 to 0/650 & 7/500 to9/300 Tal Kankavali

3747 No.NBD-2012/C.R.210/ Pln-3 Dt. 22/02/2012

597 Urgent Work

380 Thane S.T.B.T. & Widening to Badlapur Boradpada Road,MDR 59 km.15/500 to 17/500in Ambernath Tal., DistThane

9508 No.NBD-2012/C.R.211/ Pln-3 Dt. 22/02/2012

1516 Urgent Work

381 Ahmednagar Improvements to Karjat Chapadgaon Dighi road MDR82 km 52/00 to 56/700 ( Actual km 53/00 to56/700)Tal Karjat

5545 No.NBD-2012/C.R.212/ Pln-3 Dt. 22/02/2012

884 Urgent Work

382 Aurangabad Improvements Bharadi Wadodchath Gondegaon AmbhaiRoad MDR-5 Km 6/500 to 9/000 Tq Sillod DistAurangabad

5250 No.NBD-2012/C.R.213/ Pln-3 Dt. 22/02/2012

1009 Urgent Work

383 Beed Impto Dharur Asrdoha Morphali Road Km 0/00 to2/500 MDR-44 Tq.Dharur Dist.Beed

5323 No.NBD-2012/C.R.214/ Pln-3 Dt. 22/02/2012

1023 Urgent Work

384 Dhule Improvement to Kapadane Kauthal Road MDR-40 Km.7/00 to 10/00 Tal. & Dist.Dhule

7851 No.NBD-2012/C.R.215/ Pln-3 Dt. 22/02/2012

1251 Urgent Work

385 Hingoli Imp. to Kurunda to Sukali MDR-35 km. 0/00 to 2/00Wtih Minor Bridge Tq.Basmath

10000 No.NBD-2012/C.R.216/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

386 Jalna Imprvement to Chinchkhed to Jamkhed road MDR-44km 0/00 to 4/00

8133 No.NBD-2012/C.R.217/ Pln-3 Dt. 22/02/2012

1562 Urgent Work

387 Latur Improvement to Dhanora-Dighol-Poharegaon-DarjiBorgaon-Aarajkheda-Sai-Latur road MDR-4 km28/800 to 30/700 Tq. Latur and Dist.Latur

5630 No.NBD-2012/C.R.218/ Pln-3 Dt. 22/02/2012

1082 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

388 Nanded Imp. to Alegaon Khandi Datala Dahikalamba road, MDR-36,Dist. Nanded, Tq. Kandhar, Km. 35/00 to 37/00(Datala to Dahikalamba)

8265 No.NBD-2012/C.R.219/ Pln-3 Dt. 22/02/2012

1588 Urgent Work

389 Nandurbar Improvement Kolda Koparli Road (MDR- 54) Km. 14/00to 17/00 Tal & Dist. Nandurbar.

9173 No.NBD-2012/C.R.220/ Pln-3 Dt. 22/02/2012

1462 Urgent Work

390 Nashik Improvement to Slher Kelzar Tatani DangsaundaneRoad MDR-4 ( Km 6/900 to 9/00 Tal-Satana Dist-Nashik )

4000 No.NBD-2012/C.R.221/ Pln-3 Dt. 22/02/2012

638 Urgent Work

391 Nashik Improvement to Nandur Shingote Marhal road MDR-47Km 2/500 to 5/500 Tal Sinnar Dist Nashik

10000 No.NBD-2012/C.R.222/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

392 Osmanabad Imp. to Chivari Andoor Kudhawadi Shahapur NilegaonRoad MDR-38 Km 22/00 to 24/00 in Tq. Tuljapur Dist.Osmanabad.

4076 No.NBD-2012/C.R.223/ Pln-3 Dt. 22/02/2012

783 Urgent Work

393 Parbhani Improvement to Mudgal to Vita Road MDR-53 km15/200- 16/700 Dist.Parbhani

7818 No.NBD-2012/C.R.224/ Pln-3 Dt. 22/02/2012

1502 Urgent Work

394 Raigad Improvements to Poladpur Devpur Golegani KshetrapalKudpan road, MDR-51, Km. 25/300 to 27/00, Tal.Poladpur, Dist. Raigad.

5800 No.NBD-2012/C.R.225/ Pln-3 Dt. 22/02/2012

924 Urgent Work

395 Ratnagiri Improvement and B.T. to Hedavi Umarath Shir PabhareRampur Road MDR- 29 Km 22/000 to 24/000 Tal.Guhagar Dist Ratnagiri

5492 No.NBD-2012/C.R.226/ Pln-3 Dt. 22/02/2012

875 Urgent Work

396 Sindhudurg Improvements and Black topping to Otavane SarmaleBhalawal Tamboli Asaniye Zolambe Talkat Ugade roadM.D.R. 35 Km. 18/00 to Km. 22/00 and Km. 27/500 to28/500 Taluka Dodamarg, District Sindhudurg

9195 No.NBD-2012/C.R.227/ Pln-3 Dt. 22/02/2012

1466 Urgent Work

397 Thane S.T.B.T. & Widening to Badlapur Boradpada Road,MDR 59 km.17/500 to 19/500in Ambernath Tal., DistThane

8066 No.NBD-2012/C.R.228/ Pln-3 Dt. 22/02/2012

1286 Urgent Work

398 Ahmednagar Improvements to Dighi Halgaon Bavi road MDR 82 km60/00 to 62/800 Tal Jamkhed

5010 No.NBD-2012/C.R.229/ Pln-3 Dt. 22/02/2012

799 Urgent Work

399 Aurangabad Improvement to Dhoregaon Savkheda Road MDR-49 km2/00 to 4/00

5084 No.NBD-2012/C.R.230/ Pln-3 Dt. 22/02/2012

977 Urgent Work

400 Beed Imp to Hiwara Patoda Dhanora Road Km 8/00 to 10/00MDR-42 Tq.Ambajogai Dist.Beed

4000 No.NBD-2012/C.R.231/ Pln-3 Dt. 22/02/2012

768 Urgent Work

401 Dhule Improvement to Nyahalod to Kauthal Road MDR-37 Km.31/200 to 33/330 Tal. & Dist.Dhule

5000 No.NBD-2012/C.R.232/ Pln-3 Dt. 22/02/2012

797 Urgent Work

402 Hingoli STBT to Hivra Lakh Nawkha MDR-17 km.8/800 to10/950 with CD work Tq.Aundha Dist.Hingoli

10606 No.NBD-2012/C.R.233/ Pln-3 Dt. 22/02/2012

2037 Urgent Work

403 Jalgaon Improvement to Bhusawal Khadka Kinhi KhandalaMondala shindi Shelwad road MDR-22 Km 1/500 to3/200 & Km 6/00 to 8/00 Tal-Bhusawal Dist-Jalgaon.

10000 No.NBD-2012/C.R.234/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

404 Jalna Improvement to Hadadi to Kandhari road MDR-48 km17/500 to 19/00

5149 No.NBD-2012/C.R.235/ Pln-3 Dt. 22/02/2012

989 Urgent Work

405 Latur Ganjur Bhadi Mamdapur Bori Bindgihal Road MDR-20km.36/300 to 39/050 MDR-20 Tq. Latur and Dist.Latur

6151 No.NBD-2012/C.R.236/ Pln-3 Dt. 22/02/2012

1182 Urgent Work

406 Nanded Improvements to Ghungrala Rui Balegaon Road MDR-33 Dist Nanded Tq Naigaon Km 3/00 to 5/00

8222 No.NBD-2012/C.R.237/ Pln-3 Dt. 22/02/2012

1579 Urgent Work

407 Nandurbar Improvement to Vavad Vaindane Road MDR 57 Km3/00 to 6/00 Tal & Dist. Nandurbar

8328 No.NBD-2012/C.R.238/ Pln-3 Dt. 22/02/2012

1327 Urgent Work

408 Nashik Improvement to Lohane Vithewadi Kalwan Road MDR-11( Km 31/00 to 34/700 Tal-Deola Dist-Nashik )

4000 No.NBD-2012/C.R.239/ Pln-3 Dt. 22/02/2012

638 Urgent Work

409 Nashik Improvement to Somthane Panchale Pangri road MDR-45 Km 21/600 to 24/600 Tal Sinnar Dist Nashik

10000 No.NBD-2012/C.R.240/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

410 Osmanabad Imp. to NH-211 to Upala Road MDR-24 Km 0/00 to2/00 Tq. Dist. Osmanabad.

5227 No.NBD-2012/C.R.241/ Pln-3 Dt. 22/02/2012

1004 Urgent Work

411 Parbhani Imp. to Vandan - Narwadi Sonpeth Road. MDR-51.km17/00-18/500 Dist.Parbhani .

7000 No.NBD-2012/C.R.242/ Pln-3 Dt. 22/02/2012

1345 Urgent Work

412 Raigad Improvements to Poladpur Devpur Golegani KshetrapalKudpan road, MDR-51, Km. 14/00 to 16/600, Tal.Poladpur, Dist. Raigad.

7499 No.NBD-2012/C.R.243/ Pln-3 Dt. 22/02/2012

1195 Urgent Work

413 Ratnagiri Improvement and B.T. to Chikhali Karul Pangari RoadMDR No. 24 Km 9/400 to 12/000 Tal. Guhagar DistRatnagiri

6000 No.NBD-2012/C.R.244/ Pln-3 Dt. 22/02/2012

956 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

414 Sindhudurg Improvements and Black topping to Danoli SatuliVilavade Banda Road M.D.R. 34 Km. 8/300 to 9/300Taluka Sawantwadi, District Sindhudurg

3140 No.NBD-2012/C.R.245/ Pln-3 Dt. 22/02/2012

500 Urgent Work

415 Thane STBT to Amane Nandkar Road MDR 58 km.0/00 to1/00 in Tal.Bhiwandi

4896 No.NBD-2012/C.R.246/ Pln-3 Dt. 22/02/2012

780 Urgent Work

416 Ahmednagar Improvements to Ghogargaon Kombhali Walwad KarjatKarmala road MDR 80 km 20/500 to 21/500 & 24/00to 25/00 Tal Karjat

3294 No.NBD-2012/C.R.247/ Pln-3 Dt. 22/02/2012

525 Urgent Work

417 Aurangabad Improvements to Warthan Gondegaon upto Dist BoarderRoad MDR-45 Km 6/000 to 9/050 Tq Soygaon DistAurangabad

7393 No.NBD-2012/C.R.248/ Pln-3 Dt. 22/02/2012

1420 Urgent Work

418 Beed Imp to Bodhegaon to Sonhiwara Road Km 1/500 to3/500 MDR-40 Tq.Parali Dist.Beed

4793 No.NBD-2012/C.R.249/ Pln-3 Dt. 22/02/2012

921 Urgent Work

419 Dhule STBT to War Gondur Road MDR-51 Km. 0/00 to 1/500with Protection wall Tal. Dist. Dhule

6589 No.NBD-2012/C.R.250/ Pln-3 Dt. 22/02/2012

1050 Urgent Work

420 Hingoli Imp. to Pedgaon Pati Chincholi Pati Khanapur PatiTakali Nandapur MDR-17 Km. 15/00 to 17/00Tq.Hingoli Dist.Hingoli

9811 No.NBD-2012/C.R.251/ Pln-3 Dt. 22/02/2012

1885 Urgent Work

421 Jalgaon Widening & STBT to Shindi Manmodi Surwade ShelwadJamathi road MDR-22 Km 27/00 to 29/500 Tal:-Bodwad Dist:- Jalgaon

7415 No.NBD-2012/C.R.252/ Pln-3 Dt. 22/02/2012

1182 Urgent Work

422 Jalna Improvement SH-173 to Ghonsi tanda to SakalgaonYenura to SH 178 km 2/200 to 5/500 MDR-28

8358 No.NBD-2012/C.R.253/ Pln-3 Dt. 22/02/2012

1606 Urgent Work

423 Latur Naigaon Matephal Shirala Chincholi Gategaon Road km.11/200 to 13/00 MDR-07 Tq. Latur and Dist.Latur

4306 No.NBD-2012/C.R.254/ Pln-3 Dt. 22/02/2012

827 Urgent Work

424 Nanded Improvement to Musalmanwadi Markand PimpalgoanBetsangvi Shewadi Shivani Jamga Borgoan (A)Subhashnagar road MDR-26 Dist Nanded tq loha km 0/00 to2/600 &14/00 to 16/00

17342 No.NBD-2012/C.R.255/ Pln-3 Dt. 22/02/2012

3331 Urgent Work

425 Nandurbar Improvement to Taloda Kothar Road MDR 7 Km. 0/400to 3/400 Tal Taloda Dist. Nandurbar

6247 No.NBD-2012/C.R.256/ Pln-3 Dt. 22/02/2012

996 Urgent Work

426 Nashik Improvement to Ranwad Khadakjam Road MDR 41 Km11/300 to 14/300 Tal Niphad Dist Nashik

5000 No.NBD-2012/C.R.257/ Pln-3 Dt. 22/02/2012

797 Urgent Work

427 Nashik Construcationn of Major bridge on S.H.30Masobamatha Dharangaon Sarolethadi SomathaneRoad at Ch. 14/200 on Godavari river Tal. Niphad Dist.Nashik

51000 No.NBD-2012/C.R.258/ Pln-3 Dt. 22/02/2012

2550 Urgent Work

428 Osmanabad Imp. to Ter Ramewadi Bhandarwadi Road MDR-29 Km12/00 to 13/850 Tq. Dist. Osmanabad.

3499 No.NBD-2012/C.R.259/ Pln-3 Dt. 22/02/2012

672 Urgent Work

429 Parbhani Imp. to Ranisawargaon Dampuri SH-217 to PimpaldariAnterweli Road MDR-47 km 10/800-12/500Dist.Parbhani

9665 No.NBD-2012/C.R.260/ Pln-3 Dt. 22/02/2012

1857 Urgent Work

430 Raigad Improvement to Dastan Dighoda Road MDR-5 Km.3/300 to 6/800, Tal.Uran, Dist. Raigad.

14000 No.NBD-2012/C.R.261/ Pln-3 Dt. 22/02/2012

2232 Urgent Work

431 Ratnagiri Construction of Major Bridge across Jagbudi River onMhalunge Humbari Road VR-27 at Km. 1/600 TalukaKhed District Ratnagiri.

21186 No.NBD-2012/C.R.262/ Pln-3 Dt. 22/02/2012

3377 Urgent Work

432 Sindhudurg Improvements and Black topping to Niravade NhaveliKondura Talawane Aronda road M.D.R. 31 Km. 6/400to 8/400 Taluka Sawantwadi

3625 No.NBD-2012/C.R.263/ Pln-3 Dt. 22/02/2012

578 Urgent Work

433 Thane S.T.B.T. to Rayta Dahagaon Road, MDR 58 km.0/00 to1/00 in Kalyan Tal., Dist Thane

3016 No.NBD-2012/C.R.264/ Pln-3 Dt. 22/02/2012

481 Urgent Work

434 Ahmednagar STBT to Shrgionda Limpangaon Ajunj road MDR 76 km2/400 to 6/00 Tal Shrigonda

7060 No.NBD-2012/C.R.265/ Pln-3 Dt. 22/02/2012

1125 Urgent Work

435 Aurangabad Improvements to District Border Ektuni BramhagaonParundi Balanagar Road MDR-41 Km 0/000 to 2/00Tq. Paithan Dist Aurangabad

6561 No.NBD-2012/C.R.266/ Pln-3 Dt. 22/02/2012

1260 Urgent Work

436 Beed Imp to Parali Malkapur Mandwa Mandekhel Road Km4/00 to 6/00 MDR-39 Tq.Parali Dist.Beed

4000 No.NBD-2012/C.R.267/ Pln-3 Dt. 22/02/2012

768 Urgent Work

437 Dhule STBT & Widening NH-6 to Khandlay Shirdhane SaitaleRoad MDR-50 Km. 15/00 to 17/885 Tal. Dist. Dhule(Actual km.15/00 to 17/400).

9495 No.NBD-2012/C.R.268/ Pln-3 Dt. 22/02/2012

1513 Urgent Work

438 Hingoli Imp. to Goregaon Kadoli Bhagwati Tapowan Road MDR-13 km. 0/00 to 1/00 Tq.Sengaon Dist.Hingoli

3947 No.NBD-2012/C.R.269/ Pln-3 Dt. 22/02/2012

758 Urgent Work

439 Jalgaon Widening & STBT to Anturli Narwel Belaswadi Naigaonroad MDR-19 Km 14/00 to 16/00 Tal:- MuktainagarDist:- Jalgaon

7254 No.NBD-2012/C.R.270/ Pln-3 Dt. 22/02/2012

1156 Urgent Work

440 Jalna Improvement to Bodkha to Ekrukha MDR-47 km 0/0 to3/00

9590 No.NBD-2012/C.R.271/ Pln-3 Dt. 22/02/2012

1842 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

441 Latur Imp to Bokramba Motegaon Raiwadi Road MDR-3 Km10/670 to 12/800 & 13/830 to 14/550 in RenapurTaluka and Dist.Latur

5961 No.NBD-2012/C.R.272/ Pln-3 Dt. 22/02/2012

1145 Urgent Work

442 Nanded Improvement to Nanded -Sugaon-Naleshwar roadMDR23 Dist Nanded Tq Nanded km 0/00 to 2/00

25634 No.NBD-2012/C.R.273/ Pln-3 Dt. 22/02/2012

4924 Urgent Work

443 Nandurbar Improvement to Amlad Mod Borad MDR 15 Km. 0/00 to3/00 Tal Taloda Dist. Nandurbar

6502 No.NBD-2012/C.R.274/ Pln-3 Dt. 22/02/2012

1036 Urgent Work

444 Nashik Improvement to Sakore Kokangaon Wadali PimpriRoad MDR 4 Km 13/00 to 17/00 & 18/800 to 20/00Tal Niphad Dist Nashik

10000 No.NBD-2012/C.R.275/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

445 Nashik Constracting Major Bridge A/C kadwa river onpimplagoan Jopul Dindori Road (MDR- 38) atCh.14/150 Near Palkhed Village Tal - Dindori Dist-Nashik

42421 No.NBD-2012/C.R.276/ Pln-3 Dt. 22/02/2012

6763 Urgent Work

446 Osmanabad Imp. to Nandgaon Ashta Kasar Murum Omerga RoadMDR-40 Km 30/00 to 35/00 in Tq. Omerga Dist.Osmanabad.

10087 No.NBD-2012/C.R.277/ Pln-3 Dt. 22/02/2012

1938 Urgent Work

447 Parbhani Improvement to Parbhani Dhar Mangangaon Road MDR-07 km 12/500-16/00 Dist.Parbhani

18151 No.NBD-2012/C.R.278/ Pln-3 Dt. 22/02/2012

3487 Urgent Work

448 Raigad Improvements to Kharavaliphata to Kharavali road,MDR-41, Km. 0/0 to 4/00, Tal. Mangaon, Dist. Raigad.

8500 No.NBD-2012/C.R.279/ Pln-3 Dt. 22/02/2012

1355 Urgent Work

449 Ratnagiri Construction of Minor Brige on Velneshwar Bhati toAdur Borya Karul Road VR-19 at km 1/000 TalukaGuhagar District Ratnagiri.

4705 No.NBD-2012/C.R.280/ Pln-3 Dt. 22/02/2012

750 Urgent Work

450 Sindhudurg Improvements and Black topping to Adeli VajaratTalawade Ajagaon Road M.D.R. 30 Km. 0/00 to 1/00and 10/00 to 11/00 Taluka Vengurla , DistrictSindhudurg

3729 No.NBD-2012/C.R.281/ Pln-3 Dt. 22/02/2012

594 Urgent Work

451 Thane Improvement to Titwala Runde Falegaon Vasind Road,MDR 57 km.6/00 to 7/00in Kalyan Tal., Dist Thane

6300 No.NBD-2012/C.R.282/ Pln-3 Dt. 22/02/2012

1004 Urgent Work

452 Ahmednagar Improvements to Wadegavhan, Padali Ranjangaon toKadus road (MDR-67) Km 1/00 to 2/00 and 14/00 to16/00 Taluka- Parner

5217 No.NBD-2012/C.R.283/ Pln-3 Dt. 22/02/2012

832 Urgent Work

453 Aurangabad SH-30 to Girner tanda Bokudjalgaon Road MDR-37 Km1/000 to 3/500 Tq and Dist Aurangabad

6780 No.NBD-2012/C.R.284/ Pln-3 Dt. 22/02/2012

1302 Urgent Work

454 Beed Imp to Tandalwadi Undri Hol Road Km 8/00 to 9/700MDR-37 Tq.Kaij Dist.Beed

3019 No.NBD-2012/C.R.285/ Pln-3 Dt. 22/02/2012

580 Urgent Work

455 Dhule STBT & Widening of Dhule Chitod Raver Road MDR-46Km. 9/00 to 13/500 Tal. Dist. Dhule (Proposedkm.9/00 to 13/00)

13240 No.NBD-2012/C.R.286/ Pln-3 Dt. 22/02/2012

2110 Urgent Work

456 Jalgaon Improvement to Chorwad Ajnad Morgaon road MDR-17Km 4/500 to 7/200 Tal:- Raver Dist:- Jalgaon

7858 No.NBD-2012/C.R.287/ Pln-3 Dt. 22/02/2012

1253 Urgent Work

457 Jalna Improvement Kumbhar Pimpalgaon to SH 173 to Gunjto Sawargaon to Sankanpuri to Loni Phata to SH 174-AMDR-31 Km 15/00 to 18/400.

7421 No.NBD-2012/C.R.288/ Pln-3 Dt. 22/02/2012

1426 Urgent Work

458 Latur Imp to Dhanora Dighol Poheregaon Dargi BorgaonAarajkheda Latur Road km 0/00 to 3/00 MDR-4 inRenapur Taluka and Dist.Latur

6532 No.NBD-2012/C.R.289/ Pln-3 Dt. 22/02/2012

1255 Urgent Work

459 Nanded Imp. to Taluka Border Sonkhed Kalambar- BarulWaravant Pethwadaj road, MDR- 20, Dist. Nanded, Tq.Kandhar, Km. 66/400 to 69/00 (Barul to Rahati)

10094 No.NBD-2012/C.R.290/ Pln-3 Dt. 22/02/2012

1939 Urgent Work

460 Nandurbar STBT to Kheddigar Mubarkpur Ranipur road MDR-20Km. 0/00 to 3/00 Tal.Shahada, Dist.Nandurbar

5847 No.NBD-2012/C.R.291/ Pln-3 Dt. 22/02/2012

932 Urgent Work

461 Nashik Construction of causway across kanoli river on bhilkotpalasdare road @ ch 0/100 ODR-29 Tal- Malegaon. Dist.-Nasik.

4500 No.NBD-2012/C.R.292/ Pln-3 Dt. 22/02/2012

717 Urgent Work

462 Nashik Improvement to SH-21 to Adharwad Taked RoadKm.0/000 to 11/500 Tal. Igatpuri Dist. Nashik

12491 No.NBD-2012/C.R.293/ Pln-3 Dt. 22/02/2012

1991 Urgent Work

463 Osmanabad Imp. to SH-162 to Belamb Kothali Khasgi Road MDR-50Km 10/00 to 12/00 in Tq. Omerga Dist. Osmanabad.

4196 No.NBD-2012/C.R.294/ Pln-3 Dt. 22/02/2012

806 Urgent Work

464 Parbhani Imp.to Shewdi Bhosi Dahegaon Kawada Wazur RoadMDR-4 km 19/800-22/800 Dist.Parbhani

12071 No.NBD-2012/C.R.295/ Pln-3 Dt. 22/02/2012

2319 Urgent Work

465 Raigad Improvements to Kawalthe to Tambadi road, MDR-32,Km. 20/200 to 21/500, Tal. Roha, Dist. Raigad.

4000 No.NBD-2012/C.R.296/ Pln-3 Dt. 22/02/2012

638 Urgent Work

466 Ratnagiri Construction of Minor bridge on Are Ram Mandir RoadVR-260 at Km. 0/200 Taluka Guhagar DistrictRatnagiri.

4598 No.NBD-2012/C.R.297/ Pln-3 Dt. 22/02/2012

733 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

467 Sindhudurg Improvements and Black topping to Akeri VadosDukanwad Vasoli Shivapur road M.D.R. 27 Km. 14/00to 17/00 Taluka Kudal, District Sindhudurg

9342 No.NBD-2012/C.R.298/ Pln-3 Dt. 22/02/2012

1489 Urgent Work

468 Thane S.T.B.T. to Khadavali Nadgaon Falegaon Road, MDR 56km.6/000 to 7/800 in Kalyan Tal., Dist Thane

6000 No.NBD-2012/C.R.299/ Pln-3 Dt. 22/02/2012

956 Urgent Work

469 Ahmednagar Improvements to Taluka boundary to RanjangaonMashid to MDR- 66 road (MDR-57) Km 47/000 to49/300 Tal.Parner.

6701 No.NBD-2012/C.R.300/ Pln-3 Dt. 22/02/2012

1068 Urgent Work

470 Aurangabad Improvements to SH-30 Georai Bokud Jalgaon NilajgaonRoad MDR-37 Km 3/500 to 7/000 Tq. Paithan DistAurangabad

9091 No.NBD-2012/C.R.301/ Pln-3 Dt. 22/02/2012

1746 Urgent Work

471 Beed Imp to Nanadur Phata to Nandurghat Road Km 6/00 to8/200 MDR-36 Tq.Kaij Dist.Beed

4000 No.NBD-2012/C.R.302/ Pln-3 Dt. 22/02/2012

768 Urgent Work

472 Jalgaon Improvement to Savda to savda Railway Station HatnurKathora Varangaon road MDR-15 Km 15/950 to 19/00including CD Works. Tal-Bhusawal Dist-Jalgaon.

10187 No.NBD-2012/C.R.303/ Pln-3 Dt. 22/02/2012

1624 Urgent Work

473 Latur Ausa Nagarsoga Jawalga (P.) Limbala (D.) Killari roadkm 3/800 to 9/00 MDR-18 in Taluka Ausa andDist.Latur.

10046 No.NBD-2012/C.R.304/ Pln-3 Dt. 22/02/2012

1930 Urgent Work

474 Nanded Improvement to Barad-Ambegaon--Lahan-Cabhra roadMDR-16 Dist Nanded Tq Ardhapur km 19/00 to21/500

10190 No.NBD-2012/C.R.305/ Pln-3 Dt. 22/02/2012

1957 Urgent Work

475 Nandurbar Improvement to Sarangkheda Aslod Bramhanpuri roadMDR-23 Km. 18/00 to 19/500 Tal.Shahada,Dist.Nandurbar

2663 No.NBD-2012/C.R.306/ Pln-3 Dt. 22/02/2012

424 Urgent Work

476 Nashik Construction of causway across kanoli river on SayneCh-0/100 khurd to Manke road @ ch-2/500 VR-136 Tal-Malegaon. Dist.-Nasik.

4500 No.NBD-2012/C.R.307/ Pln-3 Dt. 22/02/2012

717 Urgent Work

477 Nashik Improvement to Khangaon Khadakamlagaon Road MDR44 Km 12/800 to 16/00 Tal Niphad Dist Nashik

11000 No.NBD-2012/C.R.308/ Pln-3 Dt. 22/02/2012

1753 Urgent Work

478 Osmanabad Imp. to Hipparga (Rava) Lohara Bhatangali Road MDR-35 Km 45/400 to 47/400 Tq. Lohara Dist. Osmanabad.

4323 No.NBD-2012/C.R.309/ Pln-3 Dt. 22/02/2012

830 Urgent Work

479 Raigad Improvements to Kawale to Mahagaon road, MDR-30,Km. 11/300 to 15/100, Tal. Sudhagad, Dist. Raigad.

9384 No.NBD-2012/C.R.310/ Pln-3 Dt. 22/02/2012

1496 Urgent Work

480 Ratnagiri Construction of Major Brige on Tambi River on PosareBoudhwadi to Gondhale Bramhanwadi Road VR-118Tal.Chiplun,Dist-Ratnagiri.

11717 No.NBD-2012/C.R.311/ Pln-3 Dt. 22/02/2012

1868 Urgent Work

481 Sindhudurg Improvements and Black topping to Kudal PawashiGhavanale Amberi Road M.D.R. 21 Km. 4/300 to 6/00Taluka Kudal, District Sindhudurg

5705 No.NBD-2012/C.R.312/ Pln-3 Dt. 22/02/2012

909 Urgent Work

482 Thane S.T.B.T. to Vasa Karajgaon Road MDR-5 Km. 0/00 to3/00 Tal-Dahanu

5560 No.NBD-2012/C.R.313/ Pln-3 Dt. 22/02/2012

886 Urgent Work

483 Ahmednagar Improvements to Parner Jamgaon Bhalwani road MDR62 km 8/00 to 9/00 & 18/00 to 18/600 Taluka- Parner

3355 No.NBD-2012/C.R.314/ Pln-3 Dt. 22/02/2012

535 Urgent Work

484 Aurangabad Improvement to SH-179 To Manjari Wahegaon RoadMDR-33 km 2/000 to 3/850 Dist. Aurangabad Tq.Gangapur

4000 No.NBD-2012/C.R.315/ Pln-3 Dt. 22/02/2012

768 Urgent Work

485 Beed Imp to Kannapur Bodhegaon Tokwadi Road Km 21/00to 23/00 MDR-34 Tq.Parali Dist.Beed

4521 No.NBD-2012/C.R.316/ Pln-3 Dt. 22/02/2012

868 Urgent Work

486 Jalgaon Widening & STBT to Raver Utkheda Khiroda Nhavi roadMDR-13 Km 9/600 to 13/00 Tal - Raver (Savda Sub-division)

10671 No.NBD-2012/C.R.317/ Pln-3 Dt. 22/02/2012

1701 Urgent Work

487 Jalna Improvements to Dawargaon Somthana road MDR-8 km8/00 to 12/00 Tq. Badnaur Dist. Jalna

9752 No.NBD-2012/C.R.318/ Pln-3 Dt. 22/02/2012

1873 Urgent Work

488 Latur Imp to SH-167 to Badoor Kasar Balkunda to SH 163Road Km 10/500 to 13/500 in taluka Nilanga andDist.Latur

10000 No.NBD-2012/C.R.319/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

489 Nanded Imp. to Kudala Tanda to Matul MDR-30 Dist. Nanded TqBhokar. Km. 7/400 to 10/800

10188 No.NBD-2012/C.R.320/ Pln-3 Dt. 22/02/2012

1957 Urgent Work

490 Nandurbar Improvement to Sarangkheda Tembha road MDR-27Km. 25/00 to 27/00 Tal.Shahada, Dist.Nandurbar

3356 No.NBD-2012/C.R.321/ Pln-3 Dt. 22/02/2012

535 Urgent Work

491 Nashik Constructing Minor bridge @ch 12/400 & 12/700 nearvillage Kolipada on Satana Dodheshwar Kotbel Goraneroad MDR-5 Tal-Satana Dist-Nashik

3670 No.NBD-2012/C.R.322/ Pln-3 Dt. 22/02/2012

585 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

492 Nashik Imrovemtnts to Saikheda Vadangali Vavi Road MRR-43Km.37/00 TO 40/00 Tal.Sinner Dist Nashik .

10000 No.NBD-2012/C.R.323/ Pln-3 Dt. 22/02/2012

1594 Urgent Work

493 Osmanabad Imp. to SH-162 to Dhanori Harali Toramba Road MDR-44 Km 7/00 to 9/00 Tq. Lohara Dist. Osmanabad.

4196 No.NBD-2012/C.R.324/ Pln-3 Dt. 22/02/2012

806 Urgent Work

494 Raigad Widening to 3.70 to 5.50 Varsoli Thal Chalmala RoadMDR-23 Km. 2/00 to 4/00 Tal. Alibag, Dist.Raigad.

7000 No.NBD-2012/C.R.325/ Pln-3 Dt. 22/02/2012

1116 Urgent Work

495 Ratnagiri Reonstruction of Minor Bridges on Pimpali NandivaseRoad MDR 21 in Km 11/805 and 11/890 TalukaChiplun Dist-Ratnagiri.Chainage 11/805 & 11/890

6084 No.NBD-2012/C.R.326/ Pln-3 Dt. 22/02/2012

970 Urgent Work

496 Thane Widening and Strengthening to Khambala WashindRoad MDR 45 in km.3/00 to 5/00 Tal.Bhiwandi

14000 No.NBD-2012/C.R.327/ Pln-3 Dt. 22/02/2012

2232 Urgent Work

497 Ahmednagar STBT Gawalwada to Khed road MDR 59 km 92/00 to94/100 Tal Karjat

4206 No.NBD-2012/C.R.328/ Pln-3 Dt. 22/02/2012

670 Urgent Work

498 Aurangabad Improvement to Talwada - Nagwadi Road km 0/0 to2/00 MDR-25 Dist. Aurangabad

6545 No.NBD-2012/C.R.329/ Pln-3 Dt. 22/02/2012

1257 Urgent Work

499 Beed Imp to Pawarwadi to Mogra Road Km 12/00 to 14/00MDR-32 Tq.Majalgaon Dist.Beed

5599 No.NBD-2012/C.R.330/ Pln-3 Dt. 22/02/2012

1076 Urgent Work

500 Jalgaon ST.BT to Mandal Mudi Bhilali Shahapur Nim Road.MDR-55 Km. 11/500 to 15/500 Tal. Amalner.

7040 No.NBD-2012/C.R.331/ Pln-3 Dt. 22/02/2012

1122 Urgent Work

501 Jalna Improvement to Baranjala Sabale Jawkheda JanephalBharaj Warud road MDR-5 Km 34/640 to 39/500Tq.Jafrabad Dist. Jalna

12037 No.NBD-2012/C.R.332/ Pln-3 Dt. 22/02/2012

2312 Urgent Work

502 Latur Imp to SH-167 to Nilanga Ansarwada SawariTagarkheda Road Km 20/00 to 24/800 MDR-32 inNilanga taluka and Dist.Latur

10000 No.NBD-2012/C.R.333/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

503 Nanded Imp. to Ghoti Phata to Malkapur (kd) MDR-6 DistNanded Tq Kinwat Km. 55/00 to 56/00

4807 No.NBD-2012/C.R.334/ Pln-3 Dt. 22/02/2012

923 Urgent Work

504 Nandurbar Improvement to Aslod Mandana Shahane Malkatar roadMDR-24 Km. 15/300 to 17/500 Tal.Shahada,Dist.Nandurbar

5205 No.NBD-2012/C.R.335/ Pln-3 Dt. 22/02/2012

830 Urgent Work

505 Nashik Constructing Minor bridge @ 2/200 on Karhe Ratirroad ODR- 8 Km.(Karhe Ratir.)Tal: Satana. Dist :Nashik.

6000 No.NBD-2012/C.R.336/ Pln-3 Dt. 22/02/2012

956 Urgent Work

506 Nashik Improvement to Barhe Nanashi Golshi AmbegaonDhondegaon to SH-26, Km 55/00 to 59/500 Tal NashiikDist Nashik

9400 No.NBD-2012/C.R.337/ Pln-3 Dt. 22/02/2012

1498 Urgent Work

507 Osmanabad Imp. to Takli Jawala Bhandgaon Road MDR-6 Km.14/400 to 17/500. in Tq. Paranda Dist. Osmanabad.

9462 No.NBD-2012/C.R.338/ Pln-3 Dt. 22/02/2012

1818 Urgent Work

508 Raigad Widening to 3.70 to 5.50 Awasphata Sasavane RoadMDR-22 Km. 4/00 to 6/00 Tal. Alibag, Dist.Raigad.

7000 No.NBD-2012/C.R.339/ Pln-3 Dt. 22/02/2012

1116 Urgent Work

509 Sindhudurg Improvements and B.T. Kotakamte Khudi BudhwaleMath ( BK ) Kalmath Road M.D.R. 15 , Km.16/900 to17/900, Taluka Malvan

3565 No.NBD-2012/C.R.340/ Pln-3 Dt. 22/02/2012

568 Urgent Work

510 Thane S.T.B.T. to Desai Tilsa Sonale Road MDR-36 Km. 9/00to 12/00 Tal-Wada

10365 No.NBD-2012/C.R.341/ Pln-3 Dt. 22/02/2012

1652 Urgent Work

511 Ahmednagar Improvements to Shendi Wambori road MDR 56 km9/00 to 13/800 Tal Nagar

10125 No.NBD-2012/C.R.342/ Pln-3 Dt. 22/02/2012

1614 Urgent Work

512 Aurangabad Improvement to SH-47 To Bhaigaon km 0/0 to 2/00MDR-25 Dist. Aurangabad Tq. Vaijapur

6000 No.NBD-2012/C.R.343/ Pln-3 Dt. 22/02/2012

1153 Urgent Work

513 Beed Improvement to Mahinda Doithan Ashti Khadkat RoadMDR-3 Km. 50/00 to 53/00 Tq. Ashti

6067 No.NBD-2012/C.R.344/ Pln-3 Dt. 22/02/2012

1165 Urgent Work

514 Dhule Improvement to Manjare Nimgul Road MDR-53km.16/00 to 17/00 Tal.Shindkheda Dist.Dhule.

2545 No.NBD-2012/C.R.345/ Pln-3 Dt. 22/02/2012

406 Urgent Work

515 Jalgaon Widening & Black topping to Amalner Fafora BahadapurMondhale Road. MDR- 50 km 3/00 to 4/100 Tal.Amalner.

3221 No.NBD-2012/C.R.346/ Pln-3 Dt. 22/02/2012

513 Urgent Work

516 Jalna Imp. to Bhokardan Wakadi Anwa road MDR-4 km10/00 to 15/00 Tq. Bhokardan Dist. Jalna

12953 No.NBD-2012/C.R.347/ Pln-3 Dt. 22/02/2012

2488 Urgent Work

517 Latur Imp to Yeroll Sokal Walandi Road Km 28/00 to 33/00MDR-45 in Shrur (A.) Taluka and Dist.Latur

10000 No.NBD-2012/C.R.348/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

518 Nanded Imp. to Kothari to pardi MDR-8 Dist nanded Tq. KinwatKm.0/00 to 4/00

12690 No.NBD-2012/C.R.349/ Pln-3 Dt. 22/02/2012

2438 Urgent Work

519 Nandurbar Improvement to Dhadgaon Roshmal Kh. Domkhedi roadMDR-11 Km. 3/00 to 6/00 Tal.Dhadgaon,Dist.Nandurbar

5730 No.NBD-2012/C.R.350/ Pln-3 Dt. 22/02/2012

913 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

520 Nashik Improvement to NH-3 to Adgaon sayeedpimpri Sukeneroad Km 6/00 to9/00 Tal Nashik Dist Nashik

5491 No.NBD-2012/C.R.351/ Pln-3 Dt. 22/02/2012

875 Urgent Work

521 Nashik Improvement to pardhadi Pimpri Hovli Higan dehereRoad VR-92 Tal NandgaonI)

6500 No.NBD-2012/C.R.352/ Pln-3 Dt. 22/02/2012

1036 Urgent Work

522 Osmanabad Imp. to Sonari Kaudgaon Donja Tandulwadi Road MDR-4 Km. 20/00 to 22/00.in Tq. Paranda Dist. Osmanabad.

4042 No.NBD-2012/C.R.353/ Pln-3 Dt. 22/02/2012

776 Urgent Work

523 Raigad Widening of Vakrul Varvane Tilore Road MDR-17 Km.0/00 to 2/500 Tal.Pen

7815 No.NBD-2012/C.R.354/ Pln-3 Dt. 22/02/2012

1246 Urgent Work

524 Sindhudurg Improvements and B.T Kharepatan Korle MutatWaghotan Road road M.D.R. 1Km 12/400 to 15/400,,Taluka Devgad

5994 No.NBD-2012/C.R.355/ Pln-3 Dt. 22/02/2012

955 Urgent Work

525 Thane S.T.B.T. to Gates Khanivali Palsai Asnas KelthanDakivali Road MDR-35 Km. 20/00 to 22/500 Tal-Wada

8690 No.NBD-2012/C.R.356/ Pln-3 Dt. 22/02/2012

1385 Urgent Work

526 Ahmednagar Improvement to Chincholi Gurav ChourKhauthe RoadMDR-5 Km 17/00 to 20/00 Tal .Sangamner, Dist.Ahmednagar

6119 No.NBD-2012/C.R.357/ Pln-3 Dt. 22/02/2012

975 Urgent Work

527 Aurangabad Improvement to Chikalthan Loni Bodkha Road MDR-21km 23/00 to 24/200

3231 No.NBD-2012/C.R.358/ Pln-3 Dt. 22/02/2012

621 Urgent Work

528 Beed Imp to Vida to Pimpalgaon Road Km 20/00 to 22/200MDR-29 Tq.Kaij Dist.Beed

4000 No.NBD-2012/C.R.359/ Pln-3 Dt. 22/02/2012

768 Urgent Work

529 Dhule Improvement to Gorane Waghoda Road MDR-37km.13/500 to 15/00 Tal.Shindkheda Dist.Dhule.

3760 No.NBD-2012/C.R.360/ Pln-3 Dt. 22/02/2012

599 Urgent Work

530 Jalgaon Widening of Parola Dharangaon Sonvad Paldhi RoadM.D.R. 47 km 34/500 to 40/00 (Part Sonvad to Paldhi) Tal Dharangaon.

14700 No.NBD-2012/C.R.361/ Pln-3 Dt. 22/02/2012

2343 Urgent Work

531 Latur Imp to Wadhona Beslangvi Kohoor Road Km 23/00 to28/00 in Udgir Taluka and Dist.Latur

10000 No.NBD-2012/C.R.362/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

532 Nanded Imp. to Inchegaon to Talni MDR-11 Dist Nanded TqHadgaon Km. 55/00 to 58/00

9794 No.NBD-2012/C.R.363/ Pln-3 Dt. 22/02/2012

1881 Urgent Work

533 Nandurbar Improvement to Taloda Kothar Dhadgaon road MDR-7Km. 11/750 to 13/250 Tal.Dhadgaon, Dist.Nandurbar

2922 No.NBD-2012/C.R.364/ Pln-3 Dt. 22/02/2012

466 Urgent Work

534 Nashik Improvement to Jategaon Anjenari Km 11/500 to13/800 MDR-60 (Actual Ch. 19/600 to 21/600)TAL.Nashik DIST.NASHIK.

5458 No.NBD-2012/C.R.365/ Pln-3 Dt. 22/02/2012

870 Urgent Work

535 Nashik Improvement to SH-30 to Chichondi road VR-158 Tal-Yeola

6400 No.NBD-2012/C.R.366/ Pln-3 Dt. 22/02/2012

1020 Urgent Work

536 Osmanabad Imp. to Murud Padoli Shiradhon Road MDR-21 Km.12/00 to 14/00.Tq. Kallam Dist. Osmanabad.

4047 No.NBD-2012/C.R.367/ Pln-3 Dt. 22/02/2012

777 Urgent Work

537 Raigad Widening and Strengthening & Black Topping to UkrulChandai Kadav Jambivali Road MDR-13 Km. 3/700 to5/565, Tal. Karjat

7600 No.NBD-2012/C.R.368/ Pln-3 Dt. 22/02/2012

1211 Urgent Work

538 Ratnagiri Construction of Major bridge on MDR-30 to KasabaKumbharwadi Road VR-179 at Ch. 0/100 on ShastriRiver Taluka Sangameshwar District Ratnagiri.

14997 No.NBD-2012/C.R.369/ Pln-3 Dt. 22/02/2012

2390 Urgent Work

539 Thane S.T.B.T. to Gates Khanivali Palsai Asnas KelthanDakivali Road MDR-35 Km. 34/00 to 35/00 Tal-Wada

3009 No.NBD-2012/C.R.370/ Pln-3 Dt. 22/02/2012

480 Urgent Work

540 Ahmednagar Improvement to Nimon Paregaon road MDR-5 Km 7/00to 10/00 Tal .Sangamner, Dist. Ahmednagar

6259 No.NBD-2012/C.R.371/ Pln-3 Dt. 22/02/2012

998 Urgent Work

541 Beed Improvement to SH-157 to Borkhed Anjanwati RoadMDR-25 Km. 7/00 to 12/00 Tq. Beed

9991 No.NBD-2012/C.R.373/ Pln-3 Dt. 22/02/2012

1919 Urgent Work

542 Dhule Improvement to Shindkheda Warshi Songir Road MDR-36 km.4/00 to 6/00 Tal.Shindkheda Dist.Dhule.

4940 No.NBD-2012/C.R.374/ Pln-3 Dt. 22/02/2012

787 Urgent Work

543 Jalgaon Widening of Chopda Adgaon Virwade Road MDR-4Km.4/400 To 7/00 Tal .Chopda Dist. Jalgaon

7582 No.NBD-2012/C.R.375/ Pln-3 Dt. 22/02/2012

1209 Urgent Work

544 Aurangabad Improvement to Kannad Chikalthan Bazarswangi RoadMDR-21 km 0/00 to 4/00

13059 No.NBD-2012/C.R.372/ Pln-3 Dt. 22/02/2012

2509 Urgent Work

545 Latur Imp.to Udgir Somnathpur Dongershilki Road km 28/00to 33/00 MDR-46 in Udgir Taluka and Dist.Latur.

10000 No.NBD-2012/C.R.376/ Pln-3 Dt. 22/02/2012

1921 Urgent Work

546 Nanded Imp to Bhategaon to Hadgaon MDR-14 Dist Nanded TqHadgaon Km.7/00 to 10/00

11784 No.NBD-2012/C.R.377/ Pln-3 Dt. 22/02/2012

2264 Urgent Work

547 Nandurbar Improvement to Taloda Kothar Dhadgaon road MDR-7Km. 40/00 to 41/500 Tal.Dhadgaon, Dist.Nandurbar

2755 No.NBD-2012/C.R.378/ Pln-3 Dt. 22/02/2012

439 Urgent Work

548 Nashik Improvement Dhhegaon Wadali Road Km 0/00 to 4/00ODR-37 Tal Nandgaon

4998 No.NBD-2012/C.R.379/ Pln-3 Dt. 22/02/2012

797 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

549 Osmanabad Imp. to SH-159-Mangrool Khamaswadi Road MDR-17Km. 6/00 to 8/00.Tq. Kallam Dist. Osmanabad.

4416 No.NBD-2012/C.R.380/ Pln-3 Dt. 22/02/2012

848 Urgent Work

550 Raigad Widening of Kashele Khandas Ganpatighat Road MDR-11 Km. 9/00 to 10/00 Tal. Karjat, Dist. Raigad.

5543 No.NBD-2012/C.R.381/ Pln-3 Dt. 22/02/2012

884 Urgent Work

551 Ratnagiri Construction of bridge on Bhambed Ambevan KudewadiRoad VR-68 at Km. 0/100 Taluka Lanja DistrictRatnagiri.

4697 No.NBD-2012/C.R.382/ Pln-3 Dt. 22/02/2012

749 Urgent Work

552 Thane S.T.B.T. to Kudus Kanchad Road MDR-34 Km. 0/00 to2/00 Tal-Wada

6029 No.NBD-2012/C.R.383/ Pln-3 Dt. 22/02/2012

961 Urgent Work

553 Ahmednagar Improvement to MDR-30 to Kharshinde Road MDR-31 Km 2/00 to 5/00 Tal .Sangamner, Dist.Ahmednagar

6397 No.NBD-2012/C.R.384/ Pln-3 Dt. 22/02/2012

1020 Urgent Work

554 Aurangabad Improvements to Shirodi Kh Pimpalgaon Adgaon bk Palto Wakod Road MDR-21 Km 0/000 to 2/500 TqPhulamri Dist Aurangabad

9866 No.NBD-2012/C.R.385/ Pln-3 Dt. 22/02/2012

1895 Urgent Work

555 Beed Imp to Talkhed Pungni Road Km 8/00 to 11/00 MDR-24Tq.Majagaon Dist.Beed

6325 No.NBD-2012/C.R.386/ Pln-3 Dt. 22/02/2012

1215 Urgent Work

556 Jalgaon Improvement to Yawal Virawali Haripura road MDR-10Km 5/00 to 8/00 Tal:- Yawal Dist:- Jalgaon

10780 No.NBD-2012/C.R.387/ Pln-3 Dt. 22/02/2012

1718 Urgent Work

557 Nanded Imp to SH-44 to Karkheli Vilegaon MDR-12 Dist NandedTq Dharmabad Km.0/00 to 3/00

12600 No.NBD-2012/C.R.388/ Pln-3 Dt. 22/02/2012

2420 Urgent Work

558 Nandurbar Improvement to SH-3 to Thanyavihir Alivihir road MDR-6 Km. 4/400 to 5/600 Tal.Akkalkuwa, Dist.Nandurbar

5440 No.NBD-2012/C.R.389/ Pln-3 Dt. 22/02/2012

867 Urgent Work

559 Nashik Imporovement to Saygaon to Andarsul road Km 56/00to 58/00 MDR -22 Tal Yeola

4000 No.NBD-2012/C.R.390/ Pln-3 Dt. 22/02/2012

638 Urgent Work

560 Osmanabad Imp. to Hasegaon Ieetkur Para Road MDR-14 Km. 6/00to 8/00.Tq. Kallam Dist. Osmanabad.

6833 No.NBD-2012/C.R.391/ Pln-3 Dt. 22/02/2012

1313 Urgent Work

561 Raigad Strengthening and Black Topping to Neral Kalamb RoadMDR-10 Km.2/00 to 3/500 Tal. Karjat

5000 No.NBD-2012/C.R.392/ Pln-3 Dt. 22/02/2012

797 Urgent Work

562 Ratnagiri Construction of bridge near Karbude DhanawadewadiHigh School on Karbude Dhanawadewadi KajarekondRoad at Km. 1/030 Taluka and District Ratnagiri.

4415 No.NBD-2012/C.R.393/ Pln-3 Dt. 22/02/2012

704 Urgent Work

563 Thane Widening and strengthening of Agarwadi EdwanDatiware Road, MDR 31 km.3/300 to 4/300 Tal.PalgharDist.Thane

5121 No.NBD-2012/C.R.394/ Pln-3 Dt. 22/02/2012

816 Urgent Work

564 Ahmednagar Improvement to Jambut Nandur Khandermal road MDR-26 Km 8/00 to 10/00 Tal .Sangamner, Dist.Ahmednagar

4070 No.NBD-2012/C.R.395/ Pln-3 Dt. 22/02/2012

649 Urgent Work

565 Aurangabad Improvements Aurangabad Palashi Anjandoh Road MDR-19 Km 11/500 to 13/500 Tq Dist Aurangabad

5131 No.NBD-2012/C.R.396/ Pln-3 Dt. 22/02/2012

986 Urgent Work

566 Beed Improvement to Kawadgaon Salimba Wadwani RoadMDR-20 Km. 58/500 to 62/00 Tq. Wadwani Dist.Beed

6946 No.NBD-2012/C.R.397/ Pln-3 Dt. 22/02/2012

1334 Urgent Work

567 Dhule Widening to Shirpur Adhe Thalner Holnanthe Road(MDR-34) km.19/00 to 21/600 Tal.Shirpur Dist.Dhule

7505 No.NBD-2012/C.R.398/ Pln-3 Dt. 22/02/2012

1196 Urgent Work

568 Jalgaon Improvement to Bhokar Bhadali Kinod DhanoraIdgaon Road MDR-7 K.M. 15/00 to 16/00 ( Part-Ridhur to Idgaon ) Tal.Jalgaon

4559 No.NBD-2012/C.R.399/ Pln-3 Dt. 22/02/2012

727 Urgent Work

569 Nanded Imp to Biloli to Laghul MDR-53 Dist Nanded Tq BiloliKm. 8/00 to 10/00

9648 No.NBD-2012/C.R.400/ Pln-3 Dt. 22/02/2012

1853 Urgent Work

570 Nandurbar Improvement to Gavhali Kalwan Kundi Horafali roadMDR-1 Km. 9/750 to 12/250 Tal.Akkalkuwa,Dist.Nandurbar

6603 No.NBD-2012/C.R.401/ Pln-3 Dt. 22/02/2012

1052 Urgent Work

571 Nashik Inprovements to Murumdari to dighyachibari to MangdeRoad (ODR 135) in Km 0/00 to 2/00 Tal - Surgana Dist-Nashik

6744 No.NBD-2012/C.R.402/ Pln-3 Dt. 22/02/2012

1075 Urgent Work

572 Nashik Improvement to Bhram Rahadi Road Km 6/00 to 9/00MDR -32 Tal Yeola Dist Nashik

5000 No.NBD-2012/C.R.403/ Pln-3 Dt. 22/02/2012

797 Urgent Work

573 Raigad Improvement to Chandanikond to Adistephata road,MDR-47, Km. 3/00 to 4/900, Tal. Mahad, Dist. Raigad.

4000 No.NBD-2012/C.R.404/ Pln-3 Dt. 22/02/2012

638 Urgent Work

574 Ratnagiri Construction of Minor bridge on Pawas NakhareSapuchetale Road at Km. 4/000 VR-49 Taluka andDistrict Ratnagiri.

4588 No.NBD-2012/C.R.405/ Pln-3 Dt. 22/02/2012

731 Urgent Work

575 Thane Widening and strengthening to Mahagaon AkkegaonBarahnpur Road, MDR 22 km.4/800 to 6/500Tal.Palghar Dist.Thane

5935 No.NBD-2012/C.R.406/ Pln-3 Dt. 22/02/2012

946 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

576 Ahmednagar Improvement to Rajur Tolarkhind road (MDR-20) km.0/200 to 2/200 and 8/000 to 10/000 Tal. Akole,Dist.A'Nagar.

6683 No.NBD-2012/C.R.407/ Pln-3 Dt. 22/02/2012

1065 Urgent Work

577 Aurangabad Improvements Chouka Ladsawangi Road MDR-18 Km22/400 to 25/150 MDR-18 Tq Dist Aurangabad

6491 No.NBD-2012/C.R.408/ Pln-3 Dt. 22/02/2012

1247 Urgent Work

578 Beed Improvement to Rohital to Thakar Adgaon Road MDR-18Km. 11/400 to 16/400 Tq. Georai Dist.Beed

9032 No.NBD-2012/C.R.409/ Pln-3 Dt. 22/02/2012

1735 Urgent Work

579 Dhule Improvement to Sawalde Karwand Lauki Road MDR-31km.5/00 to 7/00 Tal.Shirpur Dist.Dhule

4881 No.NBD-2012/C.R.410/ Pln-3 Dt. 22/02/2012

778 Urgent Work

580 Jalgaon Improvement to Kajgaon Gondgaon Kolgaon RoadMDR-46 K.M. 5/00 to 10/500 Tal.Bhadgaon

16749 No.NBD-2012/C.R.411/ Pln-3 Dt. 22/02/2012

2670 Urgent Work

581 Nashik Inprovements to MDR -74 to Rahude Deorgaon Road(ODR 135) in Km 0/00 to 0/500 & 1/500 to 2/500 Tal -Surgana Dist- Nashik

2646 No.NBD-2012/C.R.412/ Pln-3 Dt. 22/02/2012

422 Urgent Work

582 Nashik M.B.On Vadgaon Balhe to SH-25 Road (VR-62)@ 1/000Tal Yeola

3030 No.NBD-2012/C.R.413/ Pln-3 Dt. 22/02/2012

483 Urgent Work

583 Raigad Improvement to Gogawalewadi to Padajichakond road,MDR-46, Km. 16/800 to 17/00, & 20/800 to 23/00,Tal. Mahad, Dist. Raigad.

5990 No.NBD-2012/C.R.414/ Pln-3 Dt. 22/02/2012

955 Urgent Work

584 Ratnagiri Construction of Minor Brige on GaonkhadiNanarkarwadi Road VR-134 at km 1/800 Taluka andDistrict Ratnagiri.

2994 No.NBD-2012/C.R.415/ Pln-3 Dt. 22/02/2012

477 Urgent Work

585 Thane S.T.B.T. to Sanjan Amgaon Road MDR-2 Km. 4/500 to5/500 Tal-Dahanu

3036 No.NBD-2012/C.R.416/ Pln-3 Dt. 22/02/2012

484 Urgent Work

586 Aurangabad Improvements to MSH-8 to Wadodbajar Adgaon Kh toPirbawada Road MDR-16 Km 10/000 to 11/500 TqPhulamri Dist Aurangabad

4051 No.NBD-2012/C.R.417/ Pln-3 Dt. 22/02/2012

778 Urgent Work

587 Beed Improvement to NH-211 to Rajpimpri Road MDR-18 Km.0/00 to 6/200 Tq. Georai Dist.Beed

11041 No.NBD-2012/C.R.418/ Pln-3 Dt. 22/02/2012

2121 Urgent Work

588 Dhule Improvement to Sawalde Karwand Lauki Road MDR-31km.18/00 to 20/00 Tal.Shirpur Dist.Dhule

4958 No.NBD-2012/C.R.419/ Pln-3 Dt. 22/02/2012

790 Urgent Work

589 Jalgaon Improvement to Dahivad Karmadu Kunzar RoadMDR-43 K.M. 1/500 to 5/00 Tal.Chalisgaon

6500 No.NBD-2012/C.R.420/ Pln-3 Dt. 22/02/2012

1036 Urgent Work

590 Nashik Inprovements to Karnjkhed Bhanvad Road (MDR 72)in Km 6/00 to 8/00 Tal - Didori Dist- Nashik

4712 No.NBD-2012/C.R.421/ Pln-3 Dt. 22/02/2012

751 Urgent Work

591 Nashik Constructing Minor Bridge on Mangrul Nimgavan Roadat Ch3/300 VR-101 Tal Chandwad

4000 No.NBD-2012/C.R.422/ Pln-3 Dt. 22/02/2012

638 Urgent Work

592 Raigad Improvement to Belsai to Nagshet Road M.D.R. 32 km.2/00 to 4/00, Tal-Murud, Dist-Raigad.

6000 No.NBD-2012/C.R.423/ Pln-3 Dt. 22/02/2012

956 Urgent Work

593 Thane S.T.B.T. to Vangaon Asangaon Chandigaon Road MDR-14 Km. 1/00 to 3/00 Tal-Dahanu

3890 No.NBD-2012/C.R.424/ Pln-3 Dt. 22/02/2012

620 Urgent Work

594 Ahmednagar S.T.B.T. Shirdi Pimpalwadi Puntamba Road (MDR.9)Km.25/600 to 28/00 Tal- Rahata, Dist- Ahmednagar(Actual Km. 25/600 to 27/375)

6000 No.NBD-2012/C.R.425/ Pln-3 Dt. 22/02/2012

956 Urgent Work

595 Aurangabad Improvements to Shirodi Dongargaon Nidhona BabraRoad MDR-15 Km 5/000 to 8/000 Tq Phulamri DistAurangabad

8151 No.NBD-2012/C.R.426/ Pln-3 Dt. 22/02/2012

1566 Urgent Work

596 Beed Improvement to Beed Palwan Pimpalwadi Road MDR-13Km. 6/00 to 10/200 Tq. Beed Dist.Beed

7929 No.NBD-2012/C.R.427/ Pln-3 Dt. 22/02/2012

1523 Urgent Work

597 Dhule Improvement to Waghadi Balde Gidhade Road MDR-24km.59/370 to 60/350 & 62/300 to 63/800 Tal.ShirpurDist.Dhule

6000 No.NBD-2012/C.R.428/ Pln-3 Dt. 22/02/2012

956 Urgent Work

598 Jalgaon Improvement to Chinch gavan Londhe DaregaonRoad MDR-42 K.M. 3/00 to 7/00 Tal.Chalisgaon

6845 No.NBD-2012/C.R.429/ Pln-3 Dt. 22/02/2012

1091 Urgent Work

599 Nashik Improvements to Mhasrul Shivnai Janori Road (MDR62) in Km 12/00 to 14/00 Tal - Didori Dist- Nashik

3700 No.NBD-2012/C.R.430/ Pln-3 Dt. 22/02/2012

590 Urgent Work

600 Nashik Constructing Minor Bridge on Shelu to puri road atshle river Ch 0/400 (ODR-54) Tal chandwad

3680 No.NBD-2012/C.R.431/ Pln-3 Dt. 22/02/2012

587 Urgent Work

601 Raigad Reconstruction of existing minor bridge at Ch 8/400 onPanvel Wavanje road MDR-6 Tal. Panvel Dist. Raigad.

7500 No.NBD-2012/C.R.432/ Pln-3 Dt. 22/02/2012

1195 Urgent Work

602 Thane S.T.B.T. to Uplat Kochai Borimal Road MDR-1 Km. 3/00to 5/00 Tal-Dahanu

4209 No.NBD-2012/C.R.433/ Pln-3 Dt. 22/02/2012

671 Urgent Work

603 Ahmednagar S.T.B.T. Rahata Lohare Nimgaonjali Road (MDR.30) Km.4/00 to 7/200 Tal- Rahata, Dist- Ahmednagar (ActualKm.4/00 to 6/700)

6359 No.NBD-2012/C.R.434/ Pln-3 Dt. 22/02/2012

1014 Urgent Work

604 Aurangabad Improvements to Jamathi Titavi Sawalladbara uptoDistrict Border Road MDR-1 Km 14/000 to 15/000 ,Tq Soygaon Dist Aurangabad

4432 No.NBD-2012/C.R.435/ Pln-3 Dt. 22/02/2012

851 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

605 Beed Improvement to Shirur Rupur Gomalwada Road MDR-11 Km. 1/00 to 5/500 Tq. Shirur Dist.Beed

8584 No.NBD-2012/C.R.436/ Pln-3 Dt. 22/02/2012

1649 Urgent Work

606 Dhule Constructing Minor Bridge on Sukwad ShindkhedaDusane Road SH-11 Km. 44/200 (Actual Ch. 45/200)

3175 No.NBD-2012/C.R.437/ Pln-3 Dt. 22/02/2012

506 Urgent Work

607 Jalgaon Improvement to Chalisgaon Tarvade Tekvade RoadMDR-39 K.M. 6/00 to 9/00 Tal.Chalisgaon

12095 No.NBD-2012/C.R.438/ Pln-3 Dt. 22/02/2012

1928 Urgent Work

608 Nashik Improvements to Kulwandi Deorgaon Road (MDR -61)in Km 4/200 to 6/00 Tal - Peth Dist- Nashik

4921 No.NBD-2012/C.R.439/ Pln-3 Dt. 22/02/2012

784 Urgent Work

609 Nashik Constructing Minor Bridge on Kasari Jategaon Londhriroad at Ch.11/200 MDR-26 Tal Nnadgaon

3500 No.NBD-2012/C.R.440/ Pln-3 Dt. 22/02/2012

558 Urgent Work

610 Raigad Strengthening and Black Topping to Halphata to DhekuRoad MDR-15 Km. 1/500 to 3/00 Tal. Khalapur

5000 No.NBD-2012/C.R.441/ Pln-3 Dt. 22/02/2012

797 Urgent Work

611 Thane S.T.B.T. to Rayta Dahagaon Dapivali Yeranjad Road,MDR 58 km.22/070 to 24/000 in Ambernath Tal., DistThane

9072 No.NBD-2012/C.R.442/ Pln-3 Dt. 22/02/2012

1446 Urgent Work

612 Ahmednagar S.T.B.T. Sangamner Shiblapur Guha Road (MDR.29)Km. 24/00 to 28/00 Tal- Sangamner, Dist- Ahmednagar

7490 No.NBD-2012/C.R.443/ Pln-3 Dt. 22/02/2012

1194 Urgent Work

613 Aurangabad Improvements to Aurangabad Sindhon BhindonKachner Road MDR-38 Km 1/000 to 3/000 , 13/200 to15/500 , 18/00 to 19/000

16445 No.NBD-2012/C.R.444/ Pln-3 Dt. 22/02/2012

3159 Urgent Work

614 Dhule Constructing Minor Bridge on Deshashirwade DegaonDighave Chhail Road MDR-76 Km. 10/200 (Actual Ch.10/600)

3255 No.NBD-2012/C.R.445/ Pln-3 Dt. 22/02/2012

519 Urgent Work

615 Jalgaon Improvement to Pachora Anturli Balad NagardeolaRoad MDR-37 K.M. 11/00 to 15/500 Tal.Pachora

14151 No.NBD-2012/C.R.446/ Pln-3 Dt. 22/02/2012

2256 Urgent Work

616 Nashik Inprovements to Otur Babapur Mulane Rajapur Road(MDR-4) in Km72/00 to 73/500 Tal - Didori Dist-Nashik

3245 No.NBD-2012/C.R.447/ Pln-3 Dt. 22/02/2012

517 Urgent Work

617 Nashik Construcitng Minor Bridge Kasari to Kasabkhada road@ 3/00 ODR-37

3000 No.NBD-2012/C.R.448/ Pln-3 Dt. 22/02/2012

478 Urgent Work

618 Thane S.T.B.T. to Vasa Karajgaon Road MDR-5 Km. 3/00 to5/00 Tal-Dahanu

3991 No.NBD-2012/C.R.449/ Pln-3 Dt. 22/02/2012

636 Urgent Work

619 Ahmednagar S.T.B.T. to Belapur Rahuri Factory road MDR-7Km.46/00 to 50/00 Tal.Shrirampur (Actual Km.46/00to 49/300)

12554 No.NBD-2012/C.R.450/ Pln-3 Dt. 22/02/2012

2001 Urgent Work

620 Dhule Constructing Minor Bridge on Ner Mhasadi DhamnarRoad MDR-48 Km. 7/500

2732 No.NBD-2012/C.R.451/ Pln-3 Dt. 22/02/2012

435 Urgent Work

621 Jalgaon Improvement to Jalgaon Kanalda Road MDR-31 K.M.14/500 to 17/00 Tal.Jalgaon

7579 No.NBD-2012/C.R.452/ Pln-3 Dt. 22/02/2012

1208 Urgent Work

622 Nashik Inprovements to Pheth Torangan Hrsul Road (MDR 66)in Km 29/00 to 32/00 Tal - Trimbakeshwar Dist- Nashik

7523 No.NBD-2012/C.R.453/ Pln-3 Dt. 22/02/2012

1199 Urgent Work

623 Nashik Construction of Bridge on Yeola Patoda Lasalgaon roadMDR-34 , Km.7/800 ,Tal-Yeola, Dist - Nashik

4500 No.NBD-2012/C.R.454/ Pln-3 Dt. 22/02/2012

717 Urgent Work

624 Thane S.T.B.T. to Vadavali Kogda Akre Talavali VikramgadRoad MDR-19 Km. 17/500 to 19/500 Tal-Jawhar

5337 No.NBD-2012/C.R.455/ Pln-3 Dt. 22/02/2012

851 Urgent Work

625 Ahmednagar STBT SH 60 Jeur Chinchondi Sakegaon road (MDR 53)Km. 20/00 to 23/00 Tal. Pathardi

7656 No.NBD-2012/C.R.456/ Pln-3 Dt. 22/02/2012

1220 Urgent Work

626 Dhule Constructing Minor bridge@ ch.46/200 on WalkhedaSongir Road MDR-36 Tal.Shindkheda Dist.Dhule.

2547 No.NBD-2012/C.R.457/ Pln-3 Dt. 22/02/2012

406 Urgent Work

627 Jalgaon Improvement to Jalgaon Kanalda Road MDR-31 K.M.2/500 to 4/00 and 8/250 to 10/00 Tal.Jalgaon

10095 No.NBD-2012/C.R.458/ Pln-3 Dt. 22/02/2012

1609 Urgent Work

628 Nashik Inprovements to Ozarkhed Mulvad Rayte Bhagohal Road(MDR 65) in Km 0/00 to 3/500 Tal - Trimbakeshwar Dist- Nashik

7025 No.NBD-2012/C.R.459/ Pln-3 Dt. 22/02/2012

1120 Urgent Work

629 Nashik Construction of Bridge on Mukhed to Jalgaon neur roadVR-132, Km.3/100, 2/650,Tal-Yeola, Dist - Nashik

9500 No.NBD-2012/C.R.460/ Pln-3 Dt. 22/02/2012

1514 Urgent Work

630 Thane Reconstruction of minor bridge on Talwada VikramgadRoad SH 29 @km 71/0 Tal. Vikramgad

6471 No.NBD-2012/C.R.461/ Pln-3 Dt. 22/02/2012

1031 Urgent Work

631 Ahmednagar STBT. Amrapur Samangaon Bhatkudgaon road (MDR51) Km.8/500 to 10/300 Tal. Shevgaon

5438 No.NBD-2012/C.R.462/ Pln-3 Dt. 22/02/2012

867 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

632 Dhule Constructing Minor bridge @ ch.6/200 on ShindkhedaVarshi Road MDR-36 Tal.Shindkheda Dist.Dhule.

5674 No.NBD-2012/C.R.463/ Pln-3 Dt. 22/02/2012

904 Urgent Work

633 Jalgaon Improvement to Nashirabad Umale PalaskhedaLohara to Distt Border Road MDR-29 K.M. 46/00 to48/00 Tal.Jamner

6637 No.NBD-2012/C.R.464/ Pln-3 Dt. 22/02/2012

1058 Urgent Work

634 Nashik Improvements to Shendurni to Padalde Road MDR 18km 5/200 to 7/500 Tal Malegaon, Dist - Nashik.

3500 No.NBD-2012/C.R.465/ Pln-3 Dt. 22/02/2012

558 Urgent Work

635 Nashik Construction of Bridge on Neurgaon to Earndgaon roadVR-6, Km.0/100,Tal-Yeola, Dist - Nashik

6400 No.NBD-2012/C.R.466/ Pln-3 Dt. 22/02/2012

1020 Urgent Work

636 Thane Reconstruction of minor bridge on Zai Bordi RevasReddy Road M SH 4 @km 31/800 Tal. Dahanu

3027 No.NBD-2012/C.R.467/ Pln-3 Dt. 22/02/2012

482 Urgent Work

637 Ahmednagar Improvement to Pathardi Bodhegaon road (MDR 47)Km. 23/00 to 25/00 Tal. Shevgaon

4975 No.NBD-2012/C.R.468/ Pln-3 Dt. 22/02/2012

793 Urgent Work

638 Jalgaon Improvement to Nashirabad Umale PalaskhedaLohara to Distt Border Road MDR-29 K.M. 48/00 to50/100 Tal.Jamner

7501 No.NBD-2012/C.R.469/ Pln-3 Dt. 22/02/2012

1196 Urgent Work

639 Nashik Improvements to Malegaon Yesgaon Malgaon Road MDR20, km 4/00 to 8/00 Tal Malegaon, Dist -Nashik.(Madaki Mahadev to Yesgaon)

11000 No.NBD-2012/C.R.470/ Pln-3 Dt. 22/02/2012

1753 Urgent Work

640 Nashik Construction of Bridge on Nilkhede to Adgaonrepal roadVR-53, Km.4/250,Tal-Yeola, Dist - Nashik

4140 No.NBD-2012/C.R.471/ Pln-3 Dt. 22/02/2012

660 Urgent Work

641 Thane Reconstruction of minor bridge on Chinchani VangaonAshagad Ambesari Road SH 31 @km 43/300 Tal.Dahanu

2759 No.NBD-2012/C.R.472/ Pln-3 Dt. 22/02/2012

440 Urgent Work

642 Ahmednagar STBT Shevgaon Akhedgaon Koradgaon road (MDR 46)Km. 15/500 to 17/00 Tal. Pathardi (Actual Km.16/00 to17.00)

2988 No.NBD-2012/C.R.473/ Pln-3 Dt. 22/02/2012

476 Urgent Work

643 Jalgaon Widening & STBT to Shindi Manmodi Surwade ShelwadJamathi road MDR-22 Km 29/500 to 31/500 Tal:-Bodwad Dist:- Jalgaon

6759 No.NBD-2012/C.R.474/ Pln-3 Dt. 22/02/2012

1077 Urgent Work

644 Nashik Improvements to Varhane to Mehune Road VR 117 km0/00 to 2/700 Tal Malegaon, Dist - Nashik.

6250 No.NBD-2012/C.R.475/ Pln-3 Dt. 22/02/2012

996 Urgent Work

645 Nashik Construction of Bridge on Pimpalgaon Lep to Patodaroad VR-95, Km.0/100,Tal-Yeola, Dist - Nashik

6730 No.NBD-2012/C.R.476/ Pln-3 Dt. 22/02/2012

1073 Urgent Work

646 Thane Construction of Minor Bridge on Boisar MahagaonAkkegaon Road MDR 22 at km.22/250 Tal.PalgharDist.Thane

2996 No.NBD-2012/C.R.477/ Pln-3 Dt. 22/02/2012

478 Urgent Work

647 Ahmednagar STBT Amrampur susare Sonthane road (MDR 45) Km.4/00 to 5/00 & 9/00 to 10/00 Tal. Pathardi

6573 No.NBD-2012/C.R.478/ Pln-3 Dt. 22/02/2012

1048 Urgent Work

648 Jalgaon Widening & STBT to Anturli Narwel Belaswadi Naigaonroad MDR-19 Km 4/00 to 10/300 Tal:- MuktainagarDist:- Jalgaon

22267 No.NBD-2012/C.R.479/ Pln-3 Dt. 22/02/2012

3549 Urgent Work

649 Nashik Improvements to N.H.No.3 Patane Nimbola LohanerKalwan Rd. MDR-11 Km 27/700 to 29/700 Tal.Deola

4000 No.NBD-2012/C.R.480/ Pln-3 Dt. 22/02/2012

638 Urgent Work

650 Thane Reconstruction of Minor Bridge on Vangaon RanshetRoad MDR-17 Km. 1/450 Tal-Dahanu

3016 No.NBD-2012/C.R.481/ Pln-3 Dt. 22/02/2012

481 Urgent Work

651 Ahmednagar STBT Khedale Sonai Ghodegaon road (MDR 40) Km.1/300 to 3/300 Tal. Newasa

5446 No.NBD-2012/C.R.482/ Pln-3 Dt. 22/02/2012

868 Urgent Work

652 Jalgaon Improvement & widening to Chorwad Ajnad MorgaonMDR-17 Km. 13/00 to 16/500 Tal. Raver, Dist. Jalgaon

9953 No.NBD-2012/C.R.483/ Pln-3 Dt. 22/02/2012

1586 Urgent Work

653 Thane Reconstruction of Minor Bridge on Chinchani VangaonAshagad Ambesari Road SH-31 Km. 44/00 Tal-Dahanu

4982 No.NBD-2012/C.R.484/ Pln-3 Dt. 22/02/2012

794 Urgent Work

654 Jalgaon Improvement to Savda to Savda Railway Station Hatnurroad MDR-15 Km. 7/00 to 8/600 Tal. Raver (Savda SubDivsion)

7000 No.NBD-2012/C.R.485/ Pln-3 Dt. 22/02/2012

1116 Urgent Work

655 Ahmednagar STBT Morechinchore to Soani road (MDR 38) Km.8/00to 10/00 Tal. Newasa (Actual Km.9/00 to 10/00)

5157 No.NBD-2012/C.R.486/ Pln-3 Dt. 22/02/2012

822 Urgent Work

656 Jalgaon Constructing Minor bridge on Parola RajwadDharangaon road MDR-47 Near village Rajwad at ch.12/800 Tal. Parola

3471 No.NBD-2012/C.R.487/ Pln-3 Dt. 22/02/2012

553 Urgent Work

657 Ahmednagar STBT Khamgaon Dahigaon Bhatkudgaon to Dhorjalgaonroad (MDR 35) Km. 51/00 to 54/00 Tal. Shevgaon(Actual 52/00 to 54/00)

4364 No.NBD-2012/C.R.488/ Pln-3 Dt. 22/02/2012

696 Urgent Work

658 Jalgaon Constructing Minor bridge in km. 25/00 on KajgaonParola road MDR-46 Tal. Parola

3381 No.NBD-2012/C.R.489/ Pln-3 Dt. 22/02/2012

539 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

659 Nashik Improvements to Dahikute to Manke road Km 0/00 to1/000 (Km 0/00 -1/00) Tal: Malegaon.Dist : Nashik.

3215 No.NBD-2012/C.R.490/ Pln-3 Dt. 22/02/2012

512 Urgent Work

660 Ahmednagar S.T.B.T. to .Kolhar Belapur road MDR-34 Km.65/00 to70/00 Tal.Shrirampurur (Actual Km.65/00 to 69/00)

7572 No.NBD-2012/C.R.491/ Pln-3 Dt. 22/02/2012

1207 Urgent Work

661 Nashik Improvements to Kajavade Galane Chinchave RoadMDR 15, km 15/00 to 17/00 Tal Malegaon, Dist -Nashik.

4089 No.NBD-2012/C.R.492/ Pln-3 Dt. 22/02/2012

652 Urgent Work

662 Ahmednagar STBT Rahuri Manjari Khupati Newasa road (MDR 33)Km. 30/00 to 32/00 Tal. Newasa

4987 No.NBD-2012/C.R.493/ Pln-3 Dt. 22/02/2012

795 Urgent Work

663 Ahmednagar Improvements to Rahuri to Manjri road (MDR 33) Km.6/00 to 7/00 & 8/00 to 9/00 Tal. Rahuri.

4700 No.NBD-2012/C.R.494/ Pln-3 Dt. 22/02/2012

749 Urgent Work

664 Nashik Improvements to Dhud Dairy to C section road Km0/000 to 2/000 Tal: Malegaon.Dist : Nashik.

2660 No.NBD-2012/C.R.495/ Pln-3 Dt. 22/02/2012

424 Urgent Work

665 Ahmednagar STBT to Khandke Koudgaon Pargaon Bhatodi MandvaShiradhon road MDR 57 Part Walki to Shiradhon km28/500 to 30/00 Tal Nagar

5784 No.NBD-2012/C.R.496/ Pln-3 Dt. 22/02/2012

922 Urgent Work

666 Ahmednagar Improvement of Kopargaon Dharangaon KumbhariKolpewadi Road MDR 3 Km.0/00 to 7/00 TalKopargaon Dist Ahmadnagar (Actual 0/00 to 3/00)

8319 No.NBD-2012/C.R.497/ Pln-3 Dt. 22/02/2012

1326 Urgent Work

667 Nashik Improvements to Malegaon to Bhaygaon Road ODR 27,km 0/00 to 2/00 Tal Malegaon, Dist - Nashik.

3600 No.NBD-2012/C.R.498/ Pln-3 Dt. 22/02/2012

574 Urgent Work

668 Ahmednagar Improvement of Kopargaon Dharangaon KumbhariKolpewadi Road MDR 3 Km.8/00 to 15/00 TalKopargaon (Actual Km.11/500 to 15/00)

9838 No.NBD-2012/C.R.499/ Pln-3 Dt. 22/02/2012

1568 Urgent Work

669 Nashik Improvements to Vajirkhede to SH 10 Road ODR 27, km6/00 to 7/500 Tal Malegaon, Dist - Nashik.

2700 No.NBD-2012/C.R.500/ Pln-3 Dt. 22/02/2012

430 Urgent Work

670 Ahmednagar Improvement to Ghargaon Kauthe Pimpaldari Road(MDR-26) Km 30/00 to 33/00 Tal - Akole

6400 No.NBD-2012/C.R.501/ Pln-3 Dt. 22/02/2012

1020 Urgent Work

671 Ahmednagar S.T.B.T. Akole Deothan Road Km. 0/00 to 1/500.M.D.R.22 Tal- Akole ,Dist- Ahmednagar

5118 No.NBD-2012/C.R.502/ Pln-3 Dt. 22/02/2012

816 Urgent Work

672 Nashik Improvements to SH-19 to Ajmer Saundane Road MDR-10 Km no.0/000 to 1/8000 (Satana to Dudhmal) Tal:Satana.Dist : Nashik.

4700 No.NBD-2012/C.R.503/ Pln-3 Dt. 22/02/2012

749 Urgent Work

673 Ahmednagar STBT Gohad wasti to Daithnegunjal road VR 331 km0/00 to 1/00 Tal Nagar

2878 No.NBD-2012/C.R.504/ Pln-3 Dt. 22/02/2012

459 Urgent Work

674 Nashik Improvements to Nampur Utrane Waghale Askheda roadMDR 16Km no 3/200 to 4/800. .(Nampur to Utrane)Tal: Satana. Dist : Nashik.

4300 No.NBD-2012/C.R.505/ Pln-3 Dt. 22/02/2012

685 Urgent Work

675 Ahmednagar STBT HiwareBazar to Jakhangaon road VR 42 km 0/00to 2/00 Tal Nagar

2911 No.NBD-2012/C.R.506/ Pln-3 Dt. 22/02/2012

464 Urgent Work

676 Ahmednagar Construction of Minar bridge on Rahuri to Sonai road(MDR 37) at Ch. 13/900 Tal. Rahuri, Dist.Ahmednagar.

3255 No.NBD-2012/C.R.507/ Pln-3 Dt. 22/02/2012

519 Urgent Work

677 Nashik Improvements to Vadgaon to Kukane Road VR 18, km0/00 to 1/500 Tal Malegaon, Dist - Nashik.

2250 No.CE-Nashik-NBD-2012/22/Dt. 22/02/2012

359 Urgent Work

678 Ahmednagar STBT Rahuri Manjari Khupati Newasa road (MDR 33)Km. 27/00 to 28/00 Tal. Newasa

2283 No.CE-Nashik-NBD-2012/3/Dt. 22/02/2012

364 Urgent Work

679 Ahmednagar STBT Khedale Sonai Ghodegaon road (MDR 40) Km.11/400 to 12/400 Tal. Newasa

2498 No.CE-Nashik-NBD-2012/4/Dt. 22/02/2012

398 Urgent Work

680 Nashik Constructing missing CD works on Kersane Mulher road MDR 2 @ Ch.25/750,27/200,27/400,28/200,29/200,29/500,29/600,29/800,32/800,33/850,34/000,34/300,34/800, 35/200 Tal;-Satana.Dist:- Nashik.

2500 No.CE-Nashik-NBD-2012/25/Dt. 22/02/2012

398 Urgent Work

681 Ahmednagar Improvement and Construction of CD works toBhandardara Ratanwadi road (MDR-19) km. 11/00 to12/00 Tal. Akole, Dist.A'Nagar.

2256 No.CE-Nashik-NBD-2012/2/Dt. 22/02/2012

360 Urgent Work

682 Nashik Improvements to Satana Dodheshwar Kolipada GoraneAnandpur Jaikheda road MDR-5 Km no.26/100 to26/450 and 27/800 to 28/600 (Anandpur to Jaikheda)Tal: Satana.Dist : Nashik.

2500 No.CE-Nashik-NBD-2012/24/Dt. 22/02/2012

398 Urgent Work

683 Dhule Improvement to MDR-34 to Piloda Road MDR-35km.0/00 to 1/00 Tal.Shirpur Dist.Dhule

2000 No.CE-Nashik-NBD-2012/5/Dt. 22/02/2012

319 Urgent Work

684 Nashik Improvements to Himmatnagar Bridge to AjandebabaMandir to Duddairy Road VR 112, km 0/00 to 1/500Tal Malegaon, Dist - Nashik.

2250 No.CE-Nashik-NBD-2012/21/Dt. 22/02/2012

359 Urgent Work

685 Dhule Improvement to Manjare Nimgul Road MDR-53km.14/00 to 15/175 Tal.Shindkheda Dist.Dhule.

2500 No.CE-Nashik-NBD-2012/8/Dt. 22/02/2012

398 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

686 Nashik Improvements to Ajang to Pimpalgaon Road VR 189, km0/00 to 1/500 Tal Malegaon, Dist - Nashik.

2099 No.CE-Nashik-NBD-2012/18/Dt. 22/02/2012

335 Urgent Work

687 Nashik Constrcting Minor Bridge on Chandora to Pimpkhadaroad @ ch3/400 ODR-32 Tal Nandgaon

2000 No.CE-Nashik-NBD-2012/27/Dt. 22/02/2012

319 Urgent Work

688 Dhule Improvement to Manjare Nimgul Road MDR-53km.12/00 to 13/185 Tal.Shindkheda Dist.Dhule.

2500 No.CE-Nashik-NBD-2012/7/Dt. 22/02/2012

398 Urgent Work

689 Nashik Improvements to Aghar (kh) to Nandgaon road VR-172Km no.1/400 to 2/900 Tal: Malegaon .Dist : Nashik.

2290 No.CE-Nashik-NBD-2012/23/Dt. 22/02/2012

365 Urgent Work

690 Dhule Improvement to Manjare Nimgul Road MDR-53km.10/00 to 11/190 Tal.Shindkheda Dist.Dhule.

2500 No.CE-Nashik-NBD-2012/6/Dt. 22/02/2012

398 Urgent Work

691 Hingoli Imp. to Malhiwara Chondi Goregaon Kendra Haral MDR-11 Km. 13/00 to 13/500 Tq.Sengaon Dist.Hingoli

2056 No.CE-A'Bad-NBD-2012/1/Dt. 22/02/2012

395 Urgent Work

692 Nashik Improvements to Khadki to Hatane Road VR 115, km0/00 to 1/500 Tal Malegaon, Dist - Nashik.

2250 No.CE-Nashik-NBD-2012/19/Dt. 22/02/2012

359 Urgent Work

693 Jalgaon Improvement including widening to Parola MangarulDhulpimpri Kasoda road MDR-34 (Morfal to Mangrul)km. 8/700 to 9/500 Tal. Parola

2102 No.CE-Nashik-NBD-2012/10/Dt. 22/02/2012

335 Urgent Work

694 Nashik Constrcating Minor Bridge on Vadlibhoi Vanerbhairor to Khedgaon Road @ 11/050MDR 69 Tal Chandwad

2500 No.CE-Nashik-NBD-2012/29/Dt. 22/02/2012

398 Urgent Work

695 Jalna Improvement to SH 148 to Bramnwadi to Dist. borderMDR 30 km 0/0 to 1/00

2200 No.CE-A'Bad-NBD-2012/2/Dt. 22/02/2012

423 Urgent Work

696 Nashik Improvements to Vanpat to Kusumba Road ODR 6, km0/00 to 1/500 Tal Malegaon, Dist - Nashik.

2000 No.CE-Nashik-NBD-2012/17/Dt. 22/02/2012

319 Urgent Work

697 Sindhudurg Improvements and B.T. Kotakamte Khudi BudhwaleMath ( BK ) Kalmath Road M.D.R. 15 , Km.23/250 to24/00, Taluka Kankavali

2031 No.CE-Mumbai-NBD-2012/3/Dt. 22/02/2012

324 Urgent Work

698 Nashik Improvements to Nagzari to Galne 0/00 1/500 Tal:Malegaon.Dist : Nashik.

2250 No.CE-Nashik-NBD-2012/20/Dt. 22/02/2012

359 Urgent Work

699 Nashik Constructing Minor bridge on Angulgaon to rendaleroad at Ch.1/500 ODR-40 Tal Yeola

2300 No.CE-Nashik-NBD-2012/28/Dt. 22/02/2012

367 Urgent Work

700 Amravati Construction of Major High Level bridge across Tapiriver on Dharni Diya Bairagad Kutanga Harda road (MDR 3) in Taluka Dharni Dist. Amravati @ ch. 34/400

130552 No.NBD-2012/C.R. 508/ Pln-3 Dt. 14/03/2012

6532 Urgent Work

701 Aurangabad Construction of two VHP (Bridges) at Dheku River on SH-16 to Lakhani Mandki -Rahegaon Road MDR-66 in Km10/00 & 11/200 Tal Vaijapur Dist. Aurangabad.

30109 No.NBD-2012/C.R. 509/ Pln-3 Dt. 14/03/2012

5790 Urgent Work

702 Chandrapur Improvement to Major Bridge in Km. 52/200 on KothariTohagaon Dhaba Gondpipari road MDR 18 Near Dhabavillage

15500 No.NBD-2012/C.R. 510/ Pln-3 Dt. 14/03/2012

2416 Urgent Work

703 Jalna Improvement to SH-177 to Navha Bajiumrad PathrudSeoli Road MDR-10 km 30/00 to 36/00 Tal Jalna DistJalna

12289 No.NBD-2012/C.R. 511/ Pln-3 Dt. 14/03/2012

2361 Urgent Work

704 Nagpur Construction of Major Bridge across Sur river on KhatPimplagaon road (ODR-69) Tah.Mouda Dist.Nagpur

31746 No.NBD-2012/C.R. 512/ Pln-3 Dt. 14/03/2012

4947 Urgent Work

705 Nanded Improvements to Pethwadaj Devyachiwadi NippaniSawargaon Diggras Guntur up to taluka border MDR-48Dist Nanded Tq kandhar km 0/00 to 1/100 (Lengthvillege portion )

4810 No.NBD-2012/C.R. 513/ Pln-3 Dt. 14/03/2012

924 Urgent Work

706 Pune Construction of Major Bridge on Moii Chikhali road atKM 0/700 across Indrayani river Tal. Khed, Dist. Pune

82500 No.NBD-2012/C.R. 514/ Pln-3 Dt. 14/03/2012

4125 Urgent Work

707 Sangli Improvements to Vita Dhavaleshwar Wangi ChinchaniSonkire Bichud Borgaon road MDR 22, Km.27/00 tokm.30/00, Sec Chinchani to Sonkire in Tal-KadegaonDist.Sangl

7321 No.NBD-2012/C.R. 515/ Pln-3 Dt. 14/03/2012

1167 Urgent Work

708 Satara Construction of Minor bridge on ManewadiKumbhargaon Galmewadi Yeoti Ond road MDR-61Km.2/800 Tal.Patan Dist.Satara.

5639 No.NBD-2012/C.R. 516/ Pln-3 Dt. 14/03/2012

899 Urgent Work

709 Solapur Construction Of Minor Bridge on MalharpethPandharpur Road SH-76 near Mahud Ch @Km.128/700,At.Mahud village, Taluka-Sangola,Dist.Solapur.

7155 No.NBD-2012/C.R. 517/ Pln-3 Dt. 14/03/2012

1140 Urgent Work

710 Thane Improvement with protection work and raising of CDworks of Usagon Bhatane Road VR 101 Tal. Vasai, Dist.Thane (Near Tansa River)

26001 No.NBD-2012/C.R. 518/ Pln-3 Dt. 14/03/2012

4144 Urgent Work

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PUBLIC WORKS DEPARTMENT

Serial No.

Location Name of the Work Estimated Cost

No & Date of Administrative Approval

Budget Estimates 2012-2013

Remarks

1 2 3 4 5 6 7

(Rs. in thousands)

711 Wardha Construction of Minor Bridge on Suklibai BangdapurRoad MDR-7 @ Ch. 18/500 in Ta. Karanja (Gh.), Dist.Wardha

5907 No.NBD-2012/C.R. 519/ Pln-3 Dt. 14/03/2012

921 Urgent Work

712 Washim Construction of minor bridge across Arunavati River onWaroli to Sewadas Nagar raod ODR 84 in WashimDistrict.

9811 No.NBD-2012/C.R. 520/ Pln-3 Dt. 14/03/2012

1529 Urgent Work

713 Chandrapur C/o Minor Bridge at Neri Mhasali Road VR 117Taluka Chimur Km 1/450

27360 No.NBD-2012/C.R. 521/ Pln-3 Dt. 14/03/2012

4264 Urgent Work

714 Jalna Improvement to Bhatepuri Sawargaon Hadap RamnagarRoad MDR-11 km 7/600 to 10/00 Tal Jalna Dist Jalna

7155 No.NBD-2012/C.R. 522/ Pln-3 Dt. 14/03/2012

1374 Urgent Work

715 Nagpur Construction of Major Bridge accross Sand riverChacher Barshi Road VR-105 Tah.Mouda Dist.Nagpur

13489 No.NBD-2012/C.R. 523/ Pln-3 Dt. 14/03/2012

2102 Urgent Work

716 Nanded Construction of road from Nila Junction to Nanded -Railway Division office NH-222 MDR- 134(Taroda Canalroad) Dist Nanded Tq Nanded km 3/00 to 5/200. 6lane road

67500 No.NBD-2012/C.R. 524/ Pln-3 Dt. 14/03/2012

6750 Urgent Work

717 Sangli Imp. To Bastwade Sawalaj Dongarsoni KundalapurWagholi Arewadi Dhalagaon Nimaj Ghorpadi Road MDR-37 Km.35/00 to 39/200 Tal K.Mahankal Dist. Sangli

20000 No.NBD-2012/C.R. 525/ Pln-3 Dt. 14/03/2012

3188 Urgent Work

718 Satara Construction of Major Bridge at Perale on (SH-75 toKharade Perale Shirgaon road to MDR 51 road )ODR-112 on Krishna river near village Perale, Tal.Karad,Dist.Satara

101207 No.NBD-2012/C.R. 526/ Pln-3 Dt. 14/03/2012

5060 Urgent Work

719 Solapur Construction of Cause way on Hatid Jawala Gherdi roadMDR- 62, At.Ch.19/800 on korda nalla.Tal-Sangola,Dist.solapur

12100 No.NBD-2012/C.R. 527/ Pln-3 Dt. 14/03/2012

1929 Urgent Work

720 Wardha Construction of Minor Bridge on Suklibai BangdapurRoad MDR-7 @ Ch. 31/150 in Ta. Karanja(Gh.), Dist.Wardha

6937 No.NBD-2012/C.R. 528/ Pln-3 Dt. 14/03/2012

1081 Urgent Work

721 Nagpur Construction of Major Submerssible bridge at Km 1/0on Valetur Channa Kujba road (VR-84) Tal- Kuhi Dist-Nagpur..

27580 No.NBD-2012/C.R. 529/ Pln-3 Dt. 14/03/2012

4298 Urgent Work

722 Wardha Construction of Minor Bridge on Suklibai BangdapurRoad MDR-7 @ Ch. 35/250 in Ta.Karanja(Gh.), Dist.Wardha

6169 No.NBD-2012/C.R. 530/ Pln-3 Dt. 14/03/2012

961 Urgent Work

723 Sangli Imp. To Girgaon Morabagi Bhivargi Sankh DaribadachiDarikonur Muchandi Balegiri Basaragi Road MDR-66Part- Darikonur to Muchandi Km.32/400 to 38/400Tal Jath Dist. Sangli

11100 No.NBD-2012/C.R. 531/ Pln-3 Dt. 14/03/2012

1769 Urgent Work

724 Wardha Re-Construction of Major Bridge on Deoli Andori RoadMDR-12 in Km. 9/400 Tq. Deoli, Dist. Wardha

14986 No.NBD-2012/C.R. 532/ Pln-3 Dt. 14/03/2012

2335 Urgent Work

725 Solapur Construction of Major Bridge near Ozewadi village onGopalpur Ranzni Ozewadi Road MDR 67 Km 15/800Across Man River Tal Pandharpur Dist Solapur

99290 No.NBD-2012/C.R. 533/ Pln-3 Dt. 14/03/2012

4965 Urgent Work

726 Wardha Construction of Major Bridge on Thadi PawaniTarasawanga Sawanga Salora ODR-3 in Ta. Ashti Dist.Wardha

34995 No.NBD-2012/C.R. 534/ Pln-3 Dt. 14/03/2012

5454 Urgent Work

Total (04)(01) Works executed through NABARD loanAssistance ( 5054 075 2)

996500

Accordingly, a provision of Rs. 99,65,00,000 is, therefore, proposed to be included in the Budget Estimate 2012-2013 by the way of Section I "New-Item"

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P72

P73

WATER RESOURCES DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—10

P74

P75

4402, CAPITAL OUTLAY ON SOIL AND WATER CONSERVATION(102), Soil Conservation

(01) Kharland Schemes(44020384)27, Minor Works

Item No. 26. Taking up 13 New Kharland Schemes in Thane,Raigad,Ratnagiri&Sindhudurg District.

Recurrent . . Rs. Nil Non-Recurrent . . Rs. 10,61,20,000Total . . Rs. 1000 Ultimate Annual Recerrent Rs. 1000

Remarks.—It is proposed to take up an execution of following 13 new Kharland Schemes during thefinancial year 2012-13.

(Rs. in Thousand)

Serial Name of the Project District / Taluka Administrative ProposedNo Estimated Cost Provision

1 Donger Masuri Thane/Vasai 188,66,0002 Mulgaon Killa Thane/Vasai 42,80,0003 Varathi Chimbave Bebalghar Raigad / Mahad 131,03,0004 Aaware Raigad / Uran 156,02,0005 Koleti Raigad / Pen 111,60,0006 Murugwadi Ratnagiri / Ratnagiri 34,29,000 10007 Dewood Ratnagiri / Ratnagiri 48,68,0008 Wesavi Kate Ratnagiri/Mandangad 55,73,0009 Pedhe Parshuram Ratnagiri/Chiplun 65,22,000

10 Chiveli Ratnagiri/Chiplun 45,94,00011 Kumbhavde Ratnagiri/Rajapur 88,60,00012 Shirvane Dadhil Ratnagiri/Dapoli 43,52,00013 Varche Ansur Sindhudurg/Vengurla 49,11,000

Total 10,61,20,000

Accordingly a provision Rs.1,000 is,therefore,presented to bring the administrative approval to thenotice of the Legislature, by way of Section-I “New Item.”

——————————

4701, CAPITAL OUTLAY ON MAJOR & MEDIUM IRRIGATION190, Investment in Public Sector and Other Undertakings

(02), Plan (Share Capital Contribution)(02) (02) Share Capital Contribution to

Vidarbha Irrigation Development Corporation (4701 H 665)54, Investments

Item No. 27. Administrative approval for Kotgal Barrage Project.

Recurrent . . Rs. 365,71,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 1000 Ultimate Annual Recerrent Rs. 1000

Remarks.—It has been decided to take up the work of Kotgal Barrage Project, Dist Gadchiroli duringthe year 2012-13 as detailed below:—

(Rs. in Thousand)

Seria Name of the Project District / Administratively Project Provision ProposedNo Taluka Approved Estimate Potentia for the year 2012-13

Cost (Rs) (in Hector) (Rs)(1) (2) (3) (4) (5) (6)

1 Kotgal Barrage Gadchiroli/ 365,71,00,000 6620 5,00,000Project Gadchiroli

Accordingly a provision Rs.1,000 is,therefore,presented to bring the administrative approval to thenotice of the Legislature, by way of Section-I “New Item.”

——————————

WATER RESOURCES DEPARTMENT

H 4129—10a

P76

Rs.

(10)(02)Share Capital Contribution to Godavari Marathwada (4701 J 149) 1000

Irrigation Development Corporation

(11)(01) Share Capital Contribution to Vidarbha Irrigation (4701 J 158) 1000

Development Corporation

(12)(04)Share Capital Contribution to Godavari Marathwada (4701 J 194) 1000

54, Investments

Item No. 28. Administrative approval for Extension and Improvement works of Various projects.

Recurrent . . Rs. 131955000 Non-Recurrent . . Rs. Nil

Total . . Rs. 3000 Ultimate Annual Recerrent Rs. 3000

Remarks.—It has been decided to take up Extension and Improvement works during the year 2012-13as detailed below:—

Serial Name of Project District/Taluka Administratively ProvisionNo. Approved Proposed

Estimated Cost for the year2012-13

(1) (2) (3) (4) (5)

Marathwada Region

Godavari Marathwada Irrigation Development Corporation (4701 J 149)

1 Special Repairs of Right Canal Chain no Beed/Patoda 5516000 55160007500 to 15000 mt of MahasangviMediumproject

2 Special Repairs of Various water gates of Hingoli/Sengaon 22171000 22171000Yeldari Project (Mechanical Works)

3 Special Repairs of Various water gates of Hingoli/ 22452000 22452000

Siddheshwari Project (Mechanical Aundha NagnathWorks)

Vidarbha Region

Vidarbha Irrigation Development Corporation (4701 J 158)

1 Special repairs of damaged spillover of Gondia 32056000 32056000kalisarar Medium Project Salekasa

Rest of Maharashtra Region

Godavari Marathwada Irrigation Development Corporation (4701 J 194)

1 Strengthing of Musalwadi tank on pravara Ahamadnagar 11286000 11286000

Right bank canal and Special Repairs of Rahuriother related works.

2 Strengthing of Bhandardara Dum and Ahamadnagar 38474000 38474Special Repairs of other related works Akole

Total . . 131955000

Accordingly a provision of Rs. 3000 is, proposed to be made to bring the administrative approval to thenotice of the Legislature, by way of Section-I “New Item”.

WATER RESOURCES DEPARTMENT

P77

4702, CAPITAL OUTLAY ON MINOR IRRIGATION

190, Investment in Public Sector and Other Undertakings

00, Investment in Public Sector and Other Undertakings Rs.

(00)(16)Share Capital Contribution to Konkan (4702 7461) 1000

Irrigation Development Corporation

(00)(18) Share Capital Contribution to Godavari Marathwada (4702 7481) 1000

Irrigation Development Corporation

(00)(19) Share Capital Contribution to Vidharbha (4702 7443) 1000

Irrigation Development Corporation

(00)(19)Share Capital Contribution to Vidharbha (4702 7499) 1000

Irrigation Development Corporation

54, InvestmentsItem No. 29. Administrative approval for Extension and Improvement works of Various minor

irrigation projects.

Recurrent . . Rs. 69217000 Non-Recurrent . . Rs. Nil

Total . . Rs. 4000 Ultimate Annual Recerrent Rs. 4000

Remarks.—It has been decided to take up Extension and Improvement works of Minor Irrigation Projectunder various Irrigation Development Corporations as detailed below:—

(Rs. in Lakhs)

Sr Name of the Name of the District/ Administrative ProposedNo Corporation Project Taluka Extimated cost Provision

for 2012-13

A Rest of Maharashtra

1 Konkan Irrigation Warandh Raigad/Mahad 82.51 82.51 Development Corporation M.I (4702 7461)

2 Godavari Marathwada Otur M.I Nashik/ Kalwan 712.44 200.00Irrigation Development Punatgaon Ahmadnagar 43.56 43.56Corporation M.I /Newasa(4702 7481)

B Marathwada Region

1 Godavari Marathwada kurla M.I. Beed/Beed 198.20 100.00Irrigation DevelopmentCorporation (4702 7443)

C Vidarbha Region

1 Vidarbha Irrigation Khandezari Nagpur/ 145.88 145.88Development Corporation M.I. Bhivapur(4702 7499) Jalka Jagtap Amravati/ 120.22 120.22

ChandurM.I. Railway

Total 692.17

Accordingly a provision of Rs. 4000 is, proposed to be made to bring the administrative approval to thenotice of the Legislature, by way of Section-I “New Item”.

——————————

WATER RESOURCES DEPARTMENT

P78

P79

RURAL DEVELOPMENT AND WATER CONSERVATION DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

P80

P81RURAL DEVELOPMENT AND WATER CONSERVATION DEPARTMENT

2501, SPECIAL PROGRAMMES FOR RURAL DEVELOPMENT

06, Swayamrojgar Programme

101, Swarmajayanti Gram Swayamrojgar Scheme

(01)(05) Subsidy by Maharashtra State Rural Livelihood Mission for Non

Scheduled Castes/ Scheduled Tribes Beneficiaries (2501 2775)

33, Subsidy

Item No. 30. Provision for subsidy to Non Scheduled Castes / Scheduled Tribes Beneficiaries ofMaharashtra State Rural Livelihood Mission.

Recurrent .. .. Rs.4,00,00,000 Non-Recurrent .. .. Nil

Total .. .. Rs.4,00,00,000 Ultimate Annual Recurrent .. .. Nil

Remarks.— It has been decided to make available provision of Rs.4,00,00,000 for Non Scheduled Castes/Scheduled Tribes Beneficiaries of Maharashtra State Rural Livelihood Mission in the year 2012-13..

Hence a provision of Rs..4,00,00,000 is proposed to be made in the Budget Estimates 2012-13 by wayof Section I “ New Item”.

———————

H 4129—11

P82

P83

SOCIAL JUSTICE AND SPECIAL ASSISTANCE DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—11a

P84

P85SOCIAL JUSTICE AND SPECIAL ASSISTANCE DEPARTMENT

2235, SOCIAL SECURITY AND WELFARE

02, Social Welfare

104 Welfare of Aged Infirm and Destituts

(08)(11) Indira Gandhi National Handicapped Pension Scheme (2235 B 049)

50, Other Charges

Item No. 31. Provision for Indira Gandhi National Handicapped Pension scheme launched by Government of India.

Recurrent . . Rs. 30,00,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 30,00,00,000 Ultimate Annual Recerrent Rs. 30,00,00,000

Remarks. . As per the guidelines issued by Central Government it has been decided to implement“Indira Gandhi National Handicapped Pension Scheme” for physically handicapped persons in age groupof 18-64 years and belonging to Below Poverty line families. Rs.200 per month will be given to eachbeneficiary under this scheme.

Accordingly a provision of Rs. 30,00,00,000 is therefore proposed to be made in the Budget Estimate 2012-13 by way of Section-I “New Item”.

——————

(08)(12) Indira Gandhi National Widow Pension Scheme (2235 B 031)

50, Other Charges

Item No. 32. Provision for Indira Gandhi National Widow Pension scheme launched by Government of India.

Recurrent . . Rs. 24,00,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 24,00,00,000 Ultimate Annual Recerrent Rs. 24,00,00,000

Remarks. . As per the guidelines of Central Government it has been decided to implement “IndiraGandhi National Widow Pension Scheme” for the women in the age group of 40-64 years and belongingto Below Poverty line families. Rs.200 per month will be given to each beneficiary under this scheme.

Accordingly a provision of Rs. 24,00,00,000 is therefore proposed to be made in the Budget Estimate 2012-13 by way of Section-I “New Item”.

——————

P86

P87

HIGHER AND TECHINCAL EDUCATION DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

P88

P89HIGHER AND TECHNICAL EDUCATION DEPARTMENT

2230, LABOUR AND EMPLOYMENT03, Training

003, Training of Craftsmen and Supervisors

(02)(36) Strengthening of Industrial Training Istitute under 13th Finance Commission(2230 5873)

52, Machinery and Equipment

Item No. 33. Provision to cover the expenses of providing Machinery, Equipments and Digital facilitiesto ITI .

Recurrent . . Rs Nil Non-Recurrent . . Rs. 45,51,12,000Total . . Rs. 45,51,12,000 Ultimate Annual Recurrent Rs. Nil

Remarks.- The Government has taken a decision to provide Machinery, Equipments and Digital facilitiesto Industrial Training Institute for their strengthening as recomended by 13th Finance Commission.The totalnon recurrent expenditure for the purpose is expected to be Rs.45,51,12,000.

Accordingly, a provision of Rs. 45,51,12,000. is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

———————199, Assistance to other Government Institutions

(01) Skill Development Programme(01) State Management Committee for skill Development (2230 5855)

31 Grant-in-aid

Item No. 34. Provision to cover the expenses of Maharashtra State Skill Development Society.

Recurrent . . Rs 5,20,75,000l Non-Recurrent . . Rs. 5,08,00,000Total . . Rs. 10,28,75,000 Ultimate Annual Recurrent Rs. 5,20,75,000

Remarks.- The Government has taken a decision to establish Maharashtra State Skill DevelopmentSociety for create 4.5 crore Skill manpower under the scheme of Skill Development Programme up to year2022 in the state. The total expenditure for this Society is expected to be Rs.10,28,75,000.

Accordingly, a provision of Rs. 10,28,75,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

———————(01) State Management Committee for skill Development (2230 5855)

31 Grant-in-aid

Item No. 35. Provision to cover the expenses of “Huner se Rozgar” scheme of Central Government’sTourism Department.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 76,13,000Total . . Rs. 76,13,000 Ultimate Annual Recurrent Rs. Nil

Remarks.- The Ministry of Tourism, Government of India has launched a Training Programme to impartemployable skills in hospitality sector.Under this scheme the Government has taken a decision to start 2courses in six regions of the state. The total expenditure involved in the proposal is Rs 76,12,560 sanctionedand released by Government of India which is now required to budgeted.

Accordingly, a provision of Rs. 76,13,000 is proposed to be made in the Budget Estimates 2012-2013 byway of Section - I “New Item”.

H 4129—12

P90

NP90

NP91

H 4129—12a

NON-PLAN—SECTION-INEW ITEM FOR 2012-2013

NP92

NP93

CONTENTS

Non–Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

GENERAL ADMINISTRATION DEPARTMENT

2051, Public Service Commission

1 Provision for expenditure for creation of new posts 10,35 1 10,36 NP99

to control P.L.A of M.P.S.C.

Major Head 2051 Total … 10,35 1 10,36

2070, Other Administrative Services

2 Provision for purchasing two new vehicles for … 20,00 20,00 NP99

Maharashtra Administrative Tribunal.

Major Head 2070 Total … … 20,00 20,00

Total–General Administration Department … 10,35 20,01 30,36

HOME DEPARTMENT

2039, State Excise

3 Provision for online Computerisation of State 11,91,00 … 11,91,00 NP103

Excise Department.

Major Head 2039 Total … 11,91,00 … 11,91,00

2055, Police

4 Provision to control and regularise the traffic in 5,00 … 5,00 NP103

Mumbai city.

5 Provision to Increase Performance of GSM and Fix ... 1,85,15 1,85,15 NP103

Network Lawful Interception Solution for CP. Mumbai.

Major Head 2055 Total … 5,00 1,85,15 1,90,15

7475, Loans For Other General Economic Services

6 Provision for sanctioned subsidised loan to … 2,00,00,00 2,00,00,00 NP103

Maharahstra State Road Transport Corporation.

Major Head 7475 Total … … 2,00,00,00 2,00,00,00

Total–Home Department … 11,96,00 2,01,85,15 2,13,81,15 …

REVENUE AND FORESTS DEPARTMENT

2029, Land Acquisition Establishment

7 Provision for MPLS VPN connectivity to initiate on 20,00,00 … 20,00,00 NP107

line mutation process.

Major Head 2029 Total … 20,00,00 … 20,00,00

2052, General Administration Department

8 Provision for advertisement and publicity of Suvarn 1,50,00 … 1,50,00 NP107

Jayanti Rajaswa Abhiyan.

Major Head 2052 Total … 1,50,00 … 1,50,00

NP94

CONTENTS

Non–Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

2053, General Establishment9 Provision for Advertisement and Publicity of Suvarn 4,50,00 … 4,50,00 NP108

Jayanti Rajaswa Abhiyan.10 Provision for purchase of 150 Electronic Digital Franking … 1,71,20 1,71,20 NP108

Machines for the field Officers under theRevenue Department.

Major Head 2053 Total … 4,50,00 1,71,20 6,21,20

Total–Revenue and Forests Department … 26,00,00 1,71,20 27,71,20

FINANCE DEPARTMENT2040, Sales Tax

11 Provision to cover the expenses of Training to Officers 2,50,00 … 2,50,00 NP111and Employee of the Sales Tax Department.

12 Provision to cover the expenses of Extablishment of 5,00,00 … 5,00,00 NP111of Karprabodhini institute at Karjat, District Raigad.

Major Head 2040 Total … 7,50,00 … 7,50,00

2052, Secretariate General Services13 Provision to cover the expenses of Training to 35,00 … 35,00 NP111

Officers and Employees of the Finance Department.

Major Head 2052 Total … 35,00 … 35,00

2054, Treasury and Accounts Administration14 Provision to cover the expenses of Training to 2,01,11 … 2,01,11 NP111

Officers and Employees of the Directorate ofAccount and Treasuries.

Major Head 2054 Total … 2,01,11 … 2,01,11

2075, Miscellaneous General Services15 Provision to cover the expenditure of creation of 1,00,15 … 1,00,15 NP112

posts under Directorate of Lotteries.

Major Head 2075 Total … 1,00,15 … 1,00,15

Total–Finance Department … 10,86,26 … 10,86,26

PUBLIC WORKS DEPARTMENT4059, (1) Purchase of Helicopter

16 It has been decided to make provision for construction … 5,00,00 5,00,00 NP115of new building for sales tax office a Pune (Phase-I)

Major Head 4059 Total … … 5,00,00 5,00,00

7475, Other Expenditure17 Provision for loans to NSRDC … 1,79,02,00 1,79,02,00 NP115

Major Head 7475 Total … … 1,79,02,00 1,79,02,00

Total–Public Works Department … … 1,84,02,00 1,84,02,00

NP95

WATER RESOURCES DEPARTMENT2701, Major and Medium Irrigation

18 Grant for Repairs and Maintenance Minor Irrigation 4 … 4 NP119project for Upper Wardha Project Circle, Amaravati.

Major Head 2701 Total … 4 … 4

2702, Minor Irrigation19 Grant for Repairs and Maintenance for Minor Irrigation 5 … 5 NP120

project for Upper Wardha, Project Circle, Amaravati.

Major Head 2702 Total … 5 … 5

Total–Water Resources Department … 9 … 9

LAW AND JUDICIARY DEPARTMENT2014, Administration of Justice

20 Creation of posts of Registrar on the Establishment 1 … 1 NP123of Hight Court (Appellate Side).

21 Installation of Video Conferencing Units at 9,07 23,23 32,30 NP124Law and Juciciary Department, Mantralaya.

22 Creation of 5 New Posts in the Cadre of Peon (Group D) 1 … 1 NP124on the Establishment of GovernmentPleader Officer, High Court (Appellate Side), Mumbai.

23 To provide Express feder Line to the court at 10 District … 13,21,00 13,21,00 NP125Head Quarter.

24 To purchase Disel Generator in the District Court. … 11,00,00 11,00,00 NP125

Major Head 2014 Total … 9,09 24,44,23 24,53,32

Total–Law and Judiciary Department … 9,09 24,44,23 24,53,32

RURAL DEVELOPMENT AND WATERCONSERVATION DEPARTMENT3054, Roads and Bridges

25 Provision for maintenance and repairs of roads 5,68,00,02 … 5,68,00,02 NP129constructed under Zilla Parishad andPradhan Mantri Gram Sadak Yojana.

Major Head 3054 Total … 5,68,00,02 … 5,68,00,02

Total–Rural Development and Water … 5,68,00,02 … 5,68,00,02 Conservation Department

HOUSING DEPARTMENT2216, Housing

26 Provision for Estabishment of Housing Regulatory 1,00,00 25,01 1,25,01 NP133Authority under Maharashtra Housing Act, 2011.

27 Provision for Establishment of Housing Appelate 1,00,00 25,01 1,25,01 NP133Tribunal under Maharashtra Housing Act, 2011.

Major Head 2216 Total … 2,00,00 50,02, 2,50,02

CONTENTS

Non–Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

NP96

MEDICAL EDUCATION AND DRUG DEPARTMENT

2210, Medical and Public Health

28 Creation of new 1488 post of Nurse for various 33,79 42,03,44 42,37,23 NP137

Government Hospitals.

29 Creation of new post in MRI Department at 35,51 … 35,51 NP137

Government Medical College and Hospital, Aurangabad.

Major Head 2210 Total … 69,30 42,03,44 42,72,74

Total–Medical Education and Drug Department … 69,30 42,03,44 42,72,74

HIGHER AND TECHNICALEDCUATION DEPARTMENT

2202, General Education

30 Provision to cover the expenses of 12 colleges brought 1 … 1 NP141

under 100% grant.

Major Head 2202 Total … 1 … 1

2230, Labour and Employment

31 Provision to cover the expenses of instruments for … 54,00 54,00 NP141

disable employee.

Major Head 2230 Total … … 54,00 54,00

Total–Higher and Technical Education … 1 54,00 54,01. Department.

MAHARASHTRA LEGISLATURE SECRETARIAT

2011, Parliament/State/UnionTerritory Legislatures

32 Provision to cover the expenses of Birth Century … 2,00,00 2,00,00 NP145

of Late. Yashwantrao Chavan.

33 Provision to cover the expenses of renewal of four … 1,66,77 1,66,77 NP145

elevators in Vidhan Bhawan, Mumbai.

Major Head 2011 Total … … 3,66,77 3,66,77

Total–Maharashtra Legislature Secretariat … … 3,66,77 3,66,77

TOURISM AND CULTURAL DEPARTMENT2251, Secretarist-Social Services

34 Creation of 3 newly post of Establishment of Tourism 13,50 … 13,50 NP149and Culture Affairs Department.

Major Head 2251 Total … 13,50 … 13,50

Total–Tourism And Cultural Department … 13,50 … 13,50

Total–Grand Total … 6,19,84,62 4,58,96,82 10,78,81,44

CONTENTS

Non–Plan Section I—New Items

(Rs. in thousands)

Item Major Head and Description of Amount PageNo. New Item Recurrent Non- Total No.

Recurrent(1) (2) (3) (4) (5) (6)

NP97

GENERAL ADMINISTRATION DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—13

NP98

NP99

2051, PUBLIC SERVICE COMMISSION

102, State Public Service Commission

(00)(01) Maharashtra Service Public Commission (20510013) (Charged)

01, Salaries

Item No. 1. Provision for expenditure for creation of new posts to control P.L.A of M.P.S.C.

Recurrent .. .. Rs.10,35,000 Non-Recurrent .. .. Rs.1000

Total .. .. Rs.10,35,000 Ultimate Annual Recurrent .. .. Rs.10,35,000

Remarks.— Government has decided to create 3 new posts of Chief Accounts and Finance Officers,Assistant Accounts Officer and Deputy Accountant on the establishment of M.P.S.C. vide G.R. Dt-28/12/2011.Asper details given below

Sr Designation Pay Structure No.of post AnnualNo. Pay Band+Grade Pay Expenditure

on Salary(1) (2) (3) (4) (5)

1 Chief Accounts & Finance Officer 15600-39100+6600 1 4,66,200

2 Assistant Accounts Officer 9300-34800+4300 1 2,85,6003 Deputy Accountant 9300-34800+4200 1 2,83,500

Total 3 10,35,000

The estimated recurrent expenditure for salary of these 3 posts is Rs.10,35,000.As this is a new itemof expenditure,accordingly,a provision of Rs. 10,36,000 is proposed to be made in the Budget Estimates 2012-13 by way of Section I “ New Item”.

———————2070, OTHER ADMINISTRATIVE SERVICES

104, Vigilance(00)(02) Maharashtra Administrative Tribunal (20700693)

13, Office ExpensesItem No. 2. Provision for purchasing two new vehicles for Maharashtra Administrative Tribunal.

Recurrent .. .. Nil Non-Recurrent .. .. Rs.20,00,000

Total .. .. Rs.20,00,000 Ultimate Annual Recurrent .. .. Nil

Remarks.— As per approval given by State Level Vehicle Policy Committee, Government has decidedto purchase two new vehicles for the use of Hon’ble members of M.A.T.

Accordingly,a provision of Rs. Rs.20,00,000 is proposed to be made in the Budget Estimates 2012-13 byway of Section II “ New Item”.

———————

GENERAL ADMINISTRATION DEPARTMENT

H 4129—13a

NP100

NP101

HOME DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP102

NP103 HOME DEPARTMENT

2039, STATE EXCISE

(00)(001), Direction and Administration01, Commissioner’s Office

(01)(01) Commissioner’s Office Establishment (2039 0014)17, Computer Expenses

Item No. 3. Provision for online Computerisation of State Excise Department.

Recurrent . . Rs 11,91,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 11,91,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to implement the online computerisation of State Excise Department byappointing M/S. Ernst and Young Private Ltd. has consultant.The project will be implemented in fourphases.The phase I will be carried out during the year 2012-13 at a cost of Rs.11,91,00,000.

A Provision of Rs.11,91,00,000 is,therefore, proposed to be made in the Budget Estimates,2012-13 by wayof Section-1 “New Item”.

———————

Item No. 4. Provision to control and regularise the traffic in Mumbai city.

Recurrent . . Rs 5,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 5,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to make available provision of Rs.5,00,000 for Controlling and Regularisingthe traffic and training of road safety patrol to the school students in Mumbai.

Provision of Rs.5,00,000 is,therefore, proposed to be made in the Budget Estimate,2012-13 by way ofSection-1 “New Item”.

———————108, State Head Quarters Police

(02), City Police(02)(01) City Police Establishment (2055 0097)

Item No. 5. Provision for upgradation of G.S.M. and Fix Network Lawful Interception Solution System.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 1,85,15,000

Total . . Rs. 1,85,15,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to make available fund of Rs.1,85,15,000 for upgradation of G.S.M andFix Networks Lawful Interception Solution System of Criminal Investigation Department and Crime Preventionof Commissioner of Police,Brihanmumbai.

A Provision of Rs.1,85,15,000 is,therefore, proposed to be made in the Budget Estimates,2012-13 by wayof Section-1 “New Item”.

———————

7475, LOANS FOR OTHER GENERAL ECONOMIC SERVICES(00)(800), Other Loans

(00)(01) Loans to Maharahstra State Road Transport Corporation(7475 0172)55, Loans and Advances

Item No. 6. Provision for sanctioned subsidised loan to Maharahstra State Road Transport Corporation

Recurrent . . Rs Nil Non-Recurrent . . Rs. 200,00,00,000

Total . . Rs. 200,00,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to provide subsidised loan of Rs.200,00,00,000 to Maharahstra State RoadTransport Corporation.

A Provision of Rs.200,00,00,000 is,therefore, proposed to be made in the Budget Estimates,2012-13 byway of Section-1 “New Item”.

NP104 HOME DEPARTMENT

NP105

REVENUE AND FOREST DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—14

NP106

NP107

2029, LAND REVENUE(00)(103), Land Records

(02) District Land Records

(02)(01) Director of Land Records (20290422)17, Computer Expenses

Item No. 7. Provision for MPLS VPN connectivity to initiate on line mutation process.

Recurrent .. .. Rs.20,00,00,000 Non-Recurrent .. .. Nil

Total .. .. Rs.20,00,00,000 Ultimate Annual Recurrent .. .. Rs.20,00,00,000

Remarks.— It has been decided to initiate on line mutation process for regular updation of Record ofRight (7/12),it requires MPLS VPN connectivity to connect taluka level revenue offices of the state with StateData centre.The total recurrent expenditure for the said purpose is expected to be Rs.20,00,00,000.

Accordingly,a provision of Rs.20,00,00,000 is proposed to be made in the Budget Estimates 2012-13 byway of Section I “ New Item”.

———————

2052, SECRETARIAT GENERAL SERVICES(00)(090), Secretariat

(00)(01) Revenue and Forest Department (20520212)

26, Advertising and Publicity

Item No. 8. Provision for advertisement and publicity of Suvarn Jayanti Rajaswa Abhiyan.

Recurrent .. .. Rs.150,00,000 Non-Recurrent .. .. Nil

Total .. .. Rs.150,00,000 Ultimate Annual Recurrent .. .. Rs.150,00,000

Remarks.— Suvarn Jayanti Rajaswa Abhiyan is being implemented in the state since 1st May 2011.Ithas been decided to give statewide Audio video publicity to this Abhiyan.The total recurrent expenditure forthe said purpose is expected to be Rs. 150,00,000.

Accordingly,a provision of Rs. 150,00,000 is proposed to be made in the Budget Estimates 2012-13 byway of Section I “ New Item”.

———————

2053, DISTRICT ADMINISTRATION(00)(093), District Establishment

(01) General EstablishmentRs

(01)(01), Commissioner, Konkan (20530028)26, Advertising & Publicity 75,00,000

(01)(02) Commissioner, Nashik (20530046)26, Advertising & Publicity 75,00,000

(01)(03) Commissioner, Pune (20530064)26, Advertising & Publicity 75,00,000

(01)(04), Commissioner, Amravati (20530082)26, Advertising & Publicity 75,00,000

(01)(05) Commissioner, Nagpur (20530108)26, Advertising & Publicity 75,00,000

(01)(06) Commissioner, Aurangabad (20530126)26, Advertising & Publicity 75,00,000

——————————Total 4,50,00,000

——————————

REVENUE AND FOREST DEPARTMENT

H 4129—14a

NP108

Item No. 9. Provision for Advertisement and Publicity of Suvarn Jayanti Rajswa Abhiyan.

Recurrent .. .. Rs.4,50,00,000 Non-Recurrent .. .. Nil

Total .. .. Rs.4,50,00,000 Ultimate Annual Recurrent .. .. Rs.4,50,00,000

Remarks.— Suvarn Jayanti Rajaswa Abhiyan is being implemented in the state since 1st may 2011.Ithas been decided to give statewide Audio-Video publicity to this Abhiyan.The total recurrent expenditure forthe said purpose is expected to be Rs. 4,50,00,000.

Accordingly a provision of Rs. 450,00,000 is proposed to be made in the Budget Estimates 2012-13 byway of Section-I “New Item”

———————

2053, DISTRICT ADMINISTRATION

(00)(093), District Establishment

(01) General Establishment

Rs

(01)(01), Commissioner, Konkan (20530028)

13, Office Expenses 26,25,000

(01)(02) Commissioner, Nashik (20530046)

13, Office Expenses 27,39,000

(01)(03) Commissioner, Pune (20530064)

13, Office Expenses 17,12,000

(01)(04), Commissioner, Amravati (20530082)

13, Office Expenses 19,40,000

(01)(05) Commissioner, Nagpur (20530108)

13, Office Expenses 39,95,000

(01)(06) Commissioner, Aurangabad (20530126)

13, Office Expenses 41,09,000

—————————Total . . 171,20,000

—————————

Item No. 10. Provision for purchase of 150 Electronic Digital Franking Machines for the field Officersunder the Revenue Department.

Recurrent .. .. Nil Non-Recurrent .. .. Rs.171,20,000

Total .. .. Rs.171,20,000 Ultimate Annual Recurrent .. .. Nil

Remarks.— As per the instructions from Central Government,Remotaly Managed Franking Machinesare required to be used instead of earlier machines.It is necessary to sanction provision for purchasing firstconsignment of 150 franking machines out of total demand of 297 franking machines for 6 Revenue Divisionsin the state.The total non-recurrent expenditure for the said purpose is expected to be Rs.171,20,000.

Accordingly a provision of Rs.171,20,000. is proposed to be made in the Budget Estimates 2012-13 byway of Section I “New Item”

———————

REVENUE AND FOREST DEPARTMENT

NP109

FINANCE DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP110

NP111FINANCE DEPARTMENT

2040, TAXES ON SALES, TRADE ETC.(00) 001, Direction and Administration

(00)(01) Sales Tax Commissioner (2040 0042)13, Office Expenses

Item No. 11. Provision to cover the expences of Training to Officers and Employees of the Sales TaxDepartment.

Recurrent . . Rs 2,50,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 2,50,00,000 Ultimate Annual Recurrent Rs. 2,50,00,000

Remarks.- It has been decided to conduct various training programmes for Officers and Employees ofthe Sales Tax Department. The recurrent expenditure for the said purpose is expected to be Rs. 2,50,00,000.

Accordingly, a provision of Rs. 2,50,00,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

————————

2040, TAXES ON SALES, TRADE ETC.(00) 001, Direction and Administration

(00)(03) Establishment of Karprabodhini (2040 0178)13, Office Expenses

Item No. 12. Provision to cover the expences of Establishment of Karprabodhini Institute at Karjat,District Raigad.

Recurrent . . Rs 5,00,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 5,00,00,000 Ultimate Annual Recurrent Rs. 5,00,00,000

Remarks.- It has been decided to establish Karprabodhini Institute at Karjat, District Raigad. Therecurrent expenditure for the said purpose is expected to be Rs. 5,00,00,000.

Accordingly, a provision of Rs. 5,00,00,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

——————

2052, SECRETARIAT-GENERAL SERVICES(00) 090, Secretariat

(00)(01) Finance Department (2052 0232)13, Office Expenses

Item No. 13. Provision to cover the expences of Training to Officers and Employees of the FinanceDepartment.

Recurrent . . Rs 35,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 35,00,000 Ultimate Annual Recurrent Rs. 35,00,000

Remarks.- It has been decided to conduct various training programmes for Officers and Employees ofthe Finance Department. The recurrent expenditure for the said purpose is expected to be Rs. 35,00,000.

Accordingly, a provision of Rs. 35,00,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

————————

2054, TREASURY AND ACCOUNTS ADMINISTRATION(00) 095, Directorate of Accounts and Treasuries

(00)(01) Directorate of Accounts and Treasuries (2054 0031)13, Office Expenses

Item No. 14. Provision to cover the expences of Training to Officers and Employees of the Directorateof Accounts and Treasuries.

Recurrent . . Rs 2,01,11,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 2,01,11,000 Ultimate Annual Recurrent Rs. 2,01,11,000

Remarks.- It has been decided to conduct various training programmes for Officers and Employees ofthe Directorate of Accounts and Treasuries. The total recurrent expenditure of Rs. 201.11 lakhs includes Rs.103.15 lakhs for technical training and Rs. 97.96 lakhs for administrative training.

Accordingly, a provision of Rs. 2,01,11,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

NP112

2075, MISCELLANEOUS GENERAL SERVICES

(00) 103, State Lotteries - Directorate of Lotteries

(00)(01) Main Lottery (2075 0472)

01, Salaries

Item No. 15. Provision to cover the expenditure of creation of posts under Directorate of Lotteries.

Recurrent . . Rs 1,00,15,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 1,00,15,000 Ultimate Annual Recurrent Rs. 1,00,15,000

Remarks.- The following posts have been transferred on the establishment of Directorate of Lotteries.

Sr. No Post Pay Scale+Grade Pay Total Posts (1) (2) (3) (4)

1 Deputy Director 15600-39100 G.P.-6600 1

2 Account Officer 9300-34800 G.P.-4400 2

3 Assistant Account Officer 9300-34800 G.P.-4300 6

4 Deputy Accountant 9300-34800 G.P.-4200 12

5 Junior Clerk 5200-20200 G.P.-1900 3

6 Peon 4440-7440 G.P.-1300 6

Total … 30

The recurrent expenditure for the said purpose is expected to be Rs. 1,00,15,000.

Accordingly, a provision of Rs. 1,00,15,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

———————

FINANCE DEPARTMENT

NP113

PUBLIC WORKS DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—15

NP114

NP115PUBLIC WORKS DEPARTMENT

4059,CAPITAL OUTLAY ON PUBLIC WORKS01, Office Building

053, ConstructionRs in Thousands

(05)(01) 4059 0734 Major Works … 6043(05)(02) 4059 0743 Establishment Charges … 478

(05)(03) 4059 0752 Tools and Plants Charges … 50000

Item No. 16. It has been decided to make provision for construction of new building for Sales tax officeat Pune.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 5,00,00,000

Total . . Rs. 5,00,00,000 Ultimate Annual Recurrent Rs. Nil

Sr.No Name of Work Estimate Cost Administrative Approval no Budgetedand date Amount for the

year 2012-13

(Rs in thousands)

1 Construction of new building Rs.46,49,43,578 G.R.NoVikavi-1411/C.R.377/ 43479for Sales tax office at Pune Vi.Pra-4/ Dt.7.3.2012(Phase I Work)

7475, LOANS FOR OTHER GENERAL ECONOMIC SERVICES00, Loans for Other General Economic Services

800, Other Loans

55,Loans and Advances

Item No. 17. It has been decided to make provision for loans to Maharashtra State Road DevelopmentCorporation.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 179,02,00,000

Total . . Rs. 179,02,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to make provision for loans to be given to Maharashtra State RoadDevelopment Corporation.

Provision of Rs.179,02,00,000 is,therefore, proposed to be made in the Budget Estimate,2012-13 by wayof Section-1 “New Item”.

———————

H 4129—15a

NP116

NP117

WATER RESOURCES DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP118

NP119WATER RESOURCES DEPARTMENT

2701, MAJOR & MEDIUM IRRIGATION

03, Medium Irrigation

(02) Expenditure transfered for CRT/Permanent Establishment

by way of book adjustment

Proposed Rs.Estimates

for 2012-13

(02)(12) Superitending Engineer, (2701 B 592) 50,00,000

Upper Wardha Project Circle,Amaravati

63 Inter Account Transfer

80, General

800, Other Expenditure

(02)Collection made on account of Local Cess on Water Chargesand paid to Z.P.

(02)(16) Superitending Engineer, (2701 B 609) 4,00,000

Upper Wardha Project Circle,Amaravati, 1000

50 Other Charges

(04)Maintenance and Repairs—Administrative buldings

(04)(24)Superitending Engineer, (2701 B 618) 30,00,000

Upper Wardha Project Circle,Amaravati,

27 Minor Works

(05)Maintenance and Repairs—Residential buildings

(05)(24) Superitending Engineer, (2701 B 583) 25,00,000

Upper Wardha Project Circle,Amaravati,

27 Minor Works

Item No. 18. Grant for Repairs and Maintenance of Medium Irrigation project for Upper Wardha ProjectCircle,Amaravati. .

Recurrent . . Rs 109,00,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 4000 Ultimate Annual Recurrent Rs. 4000

Remarks : Amaravati Irrigation Division,Amaravati with 5 Sub-divisions under Akola Irrigation Circleis transfered to the Upper Wardha Project Circle,Amaravati vide Government Resolution dated 20/01/2012,for Administrative convenience.

It has been decided to make budgetary provision for this new office. Accordingly a provision of Rs.4000is, proposed to be made to bring the expenditure to the notice of the Legislature,by way of Section-I “NewItem”.

———————

NP120

2702, MINOR IRRIGATION01, Surface Water

800, Other Expenditure

Proposed Rs.Estimates

for 2012-13

(06) Maintenance and Repairs—(Above 250 hectares M.I.Scheme )(06)(16) Superitending Engineer, (2702 8482) 150,00,000Upper Wardha Project Circle,Amaravati,

27 Minor Works(07)Maintenance and Repairs—(Below 250 hectares M.I.Scheme)(07)(15) Superitending Engineer, (2702 8491) 50,00,000Upper Wardha Project Circle,Amaravati,

27 Minor Works(08)Expenditure transferd for CRT/Permanent Establishment

by way of book adjustment(08)(12) Superitending Engineer, (2702 8517) 50,00,000 1000

Upper Wardha Project Circle,Amaravati,63 Inter Account Transfer

(13)Collection made on account of Local Cess onWater Charges and paid to Z.P.

(13)(16) Superitending Engineer, (2702 8508) 5,00,000

Upper Wardha Project Circle,Amaravati,50 Other Charges

(18)Grant to Co-operative Water User Societies.(18)(16) Superitending Engineer, (2702 8526 ) 1,000

Upper Wardha Project Circle,Amaravati,27 Minor Works

Item No. 19. Grant for Repairs and Maintenance of Minor Irrigation project for Upper Wardha ProjectCircle,Amaravati.

Recurrent . . Rs 255,01,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 5000 Ultimate Annual Recurrent Rs. 5000

Remarks : Amaravati Irrigation Division,Amaravati with 5 Sub-divisions under Akola Irrigation Circleis transfered to the Upper Wardha Project Circle,Amaravati vide Government Resolution dated 20/01/2012,for Administrative convenience.

It has been decided to make budgetary provision for this new office.Accordingly a provision of Rs.5000is, proposed to be made to bring the expenditure to the notice of the Legislature,by way of Section-I “NewItem”.

————————

WATER RESOURCES DEPARTMENT

NP121

LAW AND JUDICIARY DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—16

NP122

NP123LAW AND JUDICIARY DEPARTMENT

2014, ADMINISTRATION OF JUSTICE102, High Courts

(03)(01) Registrar Appellate side (20140092)01, Salaries

Item No. 20. Provision for newly created posts on the establishment of High Courts (Appellate Side).

Recurrent . . Rs 1000 Non-Recurrent . . Rs. Nil

Total . . Rs. 1000 Ultimate Annual Recurrent Rs. 1000

Remarks.—Sanction to create 441 new posts of various cadres on the Establishment of High Courts(AppellateSide) Mumbai, Aurangabad and Nagpur Bench of the Bombay High Court has been issued vide G.R.No.Padani-2011/C.R.134/Four,dated 9th Sept 2011.The details of posts are given below.

Sr. Designation Pay Structure Grade Pay No of PostsNo. Pay Band(1) (2) (3) (4) (5)

1 Assistant Registrar 15600-39100 6600 10

2 Associate / Shirastedar/ 15600-39100/ 6600/ 3

Section Officer 9300-34800 4400

3 Private Secretary 15600-39100 6600 3

4 Personal Assistant 15600-39100 5400 3

5 Section Officer 9300-34800 4400 64

6 Deputy Chief Translator 15600-39100 6600 1

7 Senior Translator 9300-34800 4400 1

8 Junior Translator 9300-34800 4200 2

9 Stenographer(Higher Grade) 9300-34800 4400 9

10 Stenographer(Lower Grade) 9300-34800 4300 16

11 Assistant 9300-34800 4300 90

12 Clerk 5200-20200 1900 169

13 Havaldar 5200-20200 1900 2

14 Naik 4440-7440 1600 2

15 Peon 4440-7440 1300 45

16 Chopdar 5200-20200 1900 6

17 Driver 5200-20200 1900 3

18 Binder 5200-20200 1900 6

19 Filer 5200-20200 1900 2

20 Hamal 4440-7440 1300 1

21 Farash 4440-7440 1300 1

22 Cook 4440-7440 1300 1

23 Watchman 4440-7440 1300 1

Total Post . . 441

The annual recurrent expenditure of Rs. 10,47,00,000 for the said purpose is to be met from thesanctioned grants for the year 2012-13.

Accordingly a token demand Rs.1000 is,therefore, proposed in the Budget Estimates,2012-13 by way ofSection-1 “New Item”.H 4129—16a

NP124 LAW AND JUDICIARY DEPARTMENT

2014 ADMINISTRATION OF JUSTICE

114 Legal Advisers and Counsels

(00)(01) Legal Advisors & Counsels-City Officers(20140299)

Rs

06 Telephone,Electricity & Water Charges 9,07,000

13,Office Expenses 20,34,000

2052 SECRETARIAT GENERAL SERVICES

090 Secretariat

(00)(01), Law and Judiciary Department (20520259)

13, Office Expenses 2,89,000

—————Total . . 32,30,000

—————

Item No. 21. Provision for Installation of Video Conferencing units at Law and Judiciary Department.

Recurrent .. .. Rs. 9,07,000 Non-Recurrent .. .. Rs. 32,23,000

Total .. .. Rs. 32,30,000 Ultimate Annual Recurrent .. .. Rs. Nil

Remarks.— To provide and Install Video Conferencing units at Law and Judiciary Department,Mantralaya and its allied offices of Government Pleaders at Bombay High Court (Appeal,Original and WritCell) and its benches at Aurangabad,Nagpur and Government Pleader office,Supreme Court, New Delhi.

Accordingly a provision of Rs. 32,30,000 is, therefore proposed to be made in the Budget Estimates,2012-13 by way of Section—1 “New Item”.

———————

01, Salaries

Item No. 22. Provision for 5 new posts of Peon (Group D) on the establishment of Government PleaderOffice,High Court(Appellate Side)Mumbai.

Recurrent .. .. Rs. 1000 Non-Recurrent .. .. Rs. Nil

Total .. .. Rs. 1000 Ultimate Annual Recurrent .. .. Rs. 1000

Remarks.— Sanction to create 5 new posts in the cadre of peon on the establishment of GovernmentPleader Office,High Court(Appellate Side)Mumbai has been accorded as per the approval of High PowerCommitte meeting dated-22/11/2011. The details of the posts are given below :—

Sr. Designation Pay Structure Grade Pay No of PostsNo. Pay Band(1) (2) (3) (4) (5)

1 Peon 4440-7440 1300 5

Total Post . . 5

The annual expenditure of Rs.6,66,960 is proposed be met from the sanctioned grants for the year2012-13.

Accordingly a token demand of Rs. 1000 is, therefore proposed to be made in the Budget Estimates,2012-13 by way of Section—1 “New Item”.

NP125LAW AND JUDICIARY DEPARTMENT

105 Civil and Sessions Courts

(02) District and Sessions Judges

(02)(01) District and Sessions Judges (2014 0172)

13, Office Expenses

Item No. 23. Provision for Express Feeder.

Recurrent .. .. Rs. Nil Non-Recurrent .. .. Rs. 13,21,00,000

Total .. .. Rs. 13,21,00,000 Ultimate Annual Recurrent .. .. Rs. Nil

Remarks.— To provide Express Feeder Line to the Courts at 10 District Head Quarters where thereis accute load shedding.

Accordingly a provision of Rs. 13,21,00,000 is, therefore proposed to be made in the Budget Estimates,2012-13 by way of Section—1 “New Item”.

———————

13, Office Expenses

Item No. 24. Provision for Diesel Generators.

Recurrent .. .. Rs. Nil Non-Recurrent .. .. Rs. 11,00,00,000

Total .. .. Rs. 11,00,00,000 Ultimate Annual Recurrent .. .. Rs. Nil

Remarks.— To provide Diesel Generators for uninterupted electric supply to the courts at 22 districtswhere Diesel Generators Facility is required.

Accordingly a provision of Rs. 11,00,00,000 is, therefore proposed to be made in the Budget Estimates,2012-13 by way of Section—1 “New Item”.

———————

NP126

NP127

RURAL DEVELOPMENT AND WATER CONSERVATION DEPARTMENTPLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP128

NP129

3054, ROAD AND BRIDGES

04, District and Other Roads

105, Maintenance and Repairs

(00)(01) Maintenance of Roads constructed under

Pradhan Mantri Gram Sadak Yojana(3054 2375)

(00)(02) Maintenance of Repairs-purposive grants to Zilla Parishads

under section 182 of the Maharashtra Zilla Parishads and

Panchayat Samitis Act 1961 for Repairs to communications (3054 2393)

27, Minor Works

800 Other Expenditure

(00)(01) Maintenance of the roads under

Pradhan Mantri Gram Sadak Yojana from 13th Finance Commission grants (3054 2384)

(00)(02) Mainentance and repairs of Zilla Parishads

under 13th Finance Commissions grants(3054 2401)

31 Grant in aid

Item No. 25. Provision for maintenance and repairs of roads constructed under Zilla Parishad andPradhan Mantri Gram Sadak Yojana.

Recurrent .. .. Rs.568,00,02,000 Non-Recurrent .. .. Nil

Total .. .. Rs.568,00,02,000 Ultimate Annual Recurrent .. .. Nil

Remarks.— It has been decided to make available provision of Rs.5,68,0002,000 for maintenance andrepairs of roads constructed under Zilla Parishad and Pradhan Mantri Gram Sadak Yojana in the year 2012-13.

Hence a provision of Rs.568,00,02,000 is proposed to be made in the Budget Estimates 2012-13 by wayof Section I “ New Item”.

———————

RURAL DEVELOPMENT AND WATER CONSERVATION DEPARTMENT

H 4129—17

NP130

NP131

HOUSING DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

H 4129—17a

NP132

NP133HOUSING DEPARTMENT

2216, HOUSING

80, General

800, Other Expenditure

(04) Protection of Consumers Interest

(04)(02) Under Maharashtra Housing Act 2011

Housing Appellate Tribunal (Voted)(22162673)

Item No. 26. Provision for Establishment of Housing Appellate Tribunal under Maharashtra HousingAct 2011.

Recurrent . . Rs 1,00,00,000 Non-Recurrent . . Rs. 25,01,000

Total . . Rs. 1,25,01,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to make available provision of Rs.1,25,01,000 for Establishment of HousingAppellate Tribunal.

Hence Provision of Rs.1,25,01,000 is,proposed to be made in the Budget Estimate,2012-13 by way ofSection-1 “New Item”.

———————

(04)(01) Under Maharashtra Housing Act 2011

Housing Appellate Tribunal (Voted)(22162664)

Item No. 27. Provision for Establishment of Housing Regulatory Authority under Maharashtra HousingAct 2011.

Recurrent . . Rs 1,00,00,000 Non-Recurrent . . Rs. 25,01,000

Total . . Rs. 1,25,01,000 Ultimate Annual Recurrent Rs. Nil

Remarks.—It has been decided to make available provision of Rs.1,25,01,000 for Establishment of HousingRegulatory Authority.

Hence Provision of Rs.1,25,01,000 is,proposed to be made in the Budget Estimate,2012-13 by way ofSection-1 “New Item”.

———————

NP134

NP135

MEDICAL EDUCATION AND DRUGS DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP136

NP137

2210, MEDICAL AND PUBLIC HEALTH(00)(01) Director of Medical Education and Research (2210 3314)

Item No. 28. Provision for newly created 1488 post.

Recurrent . . Rs 42,37,23,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 42,37,23,000 Ultimate Annual Recurrent Rs. 42,37,23,000

Remarks.—It has been decided to create the following posts for Medical Colleges and Hospitals underDirectorate of Medical Education and Research.The details of the posts are as follows :—

Sr. Designation Pay Structure No.of postNo. Pay Band+Grade Pay(1) (2) (3) (4)

1 Matron (Class-2 Grade 1) 9300-34800+4600 22 Matron (Class-2 Grade 2) 9300-34800+4600 23 Assistant Matron 9300-34800+4400 414 Divisional Sister Incharge 9300-34800+4300 1875 Sister Incharge 9300-34800+4300 3606 Staff Nurse 9300-34800+4200 8357 Public Health Nurse 9300-34800+4200 148 Paediatric Nurse 9300-34800+4200 89 Psychiatric Nurse 9300-34800+4200 39

Total 1488

A Provision of Rs.42,37,23,000 is,therefore, proposed to be made in the Budget Estimates,2012-13 by wayof Section-1 “New Item”.

———————

2210, MEDICAL AND PUBLIC HEALTH01 Urban Health Services - Allopathy

110 Hospitals and Dispensaries(02)(03) Medical College and Hospital, Aurangabad (2210 1652)

Item No. 29. Provision for creation of new posts in MRI Department in Government Medical Collegeand Hospital Aurangabad.

Recurrent . . Rs 1000 Non-Recurrent . . Rs. Nil

Total . . Rs. 1000 Ultimate Annual Recurrent Rs. 1000

Remarks.—It has been decided to create the following posts for MRI Department in Government MedicalCollege & Hospital Aurangabad.As the entire annual recurrent expenditure of Rs.35,51,000 can be accomodatedfrom the sanctioned grant,a token New Item of Rs.1000 is proposed.The details of the posts are as follows:-

Sr. Designation Pay Structure No.of postNo. Pay Band+Grade Pay(1) (2) (3) (4)

1 Lecturer (Radiology) 15600-39100+6000 22 Staff Nurse 9300-34800+4200 23 M.R.I Technician 9300-34800+4200 44 Junior Clerk 5200-20200+1900 2

Total 10

A Provision of Rs.1000 is,therefore, proposed to be made in the Budget Estimates,2012-13 by way ofSection-1 “New Item”.

MEDICAL EDUCATION AND DRUGS DEPARTMENT

H 4129—18

NP138

NP139

HIGHER AND TECHNICAL EDUCATION DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP140

NP141

2202, GENERAL EDUCATION

03, Universities and Higher Education

104, Assistance to Non-Government Colleges and Institutes

(01) Assistance to Non-Government Colleges

(01)(01) Grants to Non-Government Arts, Science,

Commerce and Law Colleges (2202 0872)

36, Grant-in-Aid (Salary)

Item No. 30. Provision to cover the expenses of 8 colleges brought under 100 % Grant-in-Aid.

Recurrent . . Rs 1000 Non-Recurrent . . Rs. Nil

Total . . Rs. 1000 Ultimate Annual Recurrent Rs. 5,50,01,000

Remarks.- Government has taken a decision to sanction 8 unaided Non-Government Colleges and 26additional divisions/subjects on 100% grant-in-aid, which fulfill the criteria required for the purpose. Accordingly,the 8 colleges and 26 additional divisions/subjects are eligible for 100% grant in aid. The recurrent expenditurefor the purpose is expected to be Rs.5,50,01,000. As the entire expenditure can be accommodated within thesanctioned grants of the financial year 2012-2013.

Accordingly, a token provision of Rs. 1000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

———————

2230, LABOUR AND EMPLOYMENT

03, Training

003, Training of Craftsmen and Supervisors

(02)(01) Technical and Vocational Training of Craftsmen (2230 0316)

13 Office expenses

Item No. 31. Provision to cover the expenses of instruments for disable employees.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 54,00,000

Total . . Rs. 54,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.- The Government has taken a decision to provide instruments for disable employees underthe Directorate of Vocational Education and Training as per directions of Hon’ble High Court, Mumbai. Thetotal non recurrent expenditure for the purpose is expected to be Rs.54,00,000.

Accordingly, a provision of Rs. 54,00,000 is proposed to be made in the Budget Estimates 2012-2013 byway of Section - I “New Item”.

———————

HIGHER AND TECHNICAL EDUCATION DEPARTMENT

H 4129—19

NP142

NP143

MAHARASHTRA LEGISLATURE SECRETARIAT

NON-PLAN — SECTION I

NEW ITEM FOR – 2012-2013

(G.C.P.) H 4129—20 (2210---3-2012)

NP144

NP145MAHARASHTRA LEGISLATURE SECRETARIAT

2011, PARLIAMENT/STATE/UNION TERRITORY LEGISLATURES

02, State/Union Territory Legislatures

103, Legislative Secretariat

(00)(01) Maharashtra Legislature Secretariat (2011 0076)

13, Office Expenses

Item No. 32. Provision to cover the expences of Birth Centenary of Late Yashwantrao Chavan.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 2,00,00,000

Total . . Rs. 2,00,00,000 Ultimate Annual Recurrent Rs. Nil

Remarks.- The Birth Centenary year of Late Yashwantrao Chavan will be celebrated throughout the State.The Non-Recurrent expenditure for the various programmes to be arranged for the same is expected to beRs. 2,00,00,000.

Accordingly, a provision of Rs. 2,00,00,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

———————

2011, PARLIAMENT/STATE/UNION TERRITORY LEGISLATURES

02, State/Union Territory Legislatures

103, Legislative Secretariat

(00)(03) Infrastructure Development of Maharashtra Legislative Secretariat (2011 0129)

27, Minor Works

Item No. 33. Provision to cover the expences of replacing elevators at Vidhan Bhavan Mumbai.

Recurrent . . Rs Nil Non-Recurrent . . Rs. 1,66,77,000

Total . . Rs. 1,66,77,000 Ultimate Annual Recurrent Rs. Nil

Remarks.- It has been decided to replace the old elevators at Vidhan Bhavan Mumbai.The total Non-Recurrent expenditure required for the same is expected to be Rs. 1.6677 cr.

Accordingly, a provision of Rs. 1,66,77,000 is proposed to be made in the Budget Estimates 2012-2013by way of Section - I “New Item”.

————————

H 4129—20a

NP146

NP147

TOURISM AND CULTURAL AFFAIRS DEPARTMENTNON-PLAN — SECTION-I

NEW ITEM FOR – 2012-2013

NP148

NP149 TOURISM AND CULTURAL AFFAIRS DEPARTMENT

2251 SECRETARIAT-SOCIAL SERVICES

090 Secretariat

(01)(01) Tourism and Cultural Affairs Department(2251 0632)

01, Salaries

Item No. 34. Provision for 3 new posts on the Establishment Tourism and Cultural Affairs Department.

Recurrent . . Rs 13,50,000 Non-Recurrent . . Rs. Nil

Total . . Rs. 13,50,000 Ultimate Annual Recurrent Rs. 13,50,000

Remarks.—Sanction to create of 3 new posts on Establishment of Tourism and Cultural Affairs Departmenthas been issued vide G.R.No.Misc2011/C.R.536/Est, Dt-17/12/2011.The post details are given below :—

Sr. Designation Pay Structure No.of post AnnualNo. Pay Band+Grade Pay Expenditure

on Salary(1) (2) (3) (4) (5)

1 Deputy Secretary 15600-39100+7600 1 7,00,000

2 Stenographer (H.G.) 9300-34800+4400 1 5,00,000

3 Peon 4440-7440+1300 1 1,50,000

Total . . 3 13,50,000

A Provision of Rs.13,50,000 is,therefore, proposed to be made in the Budget Estimates,2012-13 by wayof Section-1 “New Item”.

———————

Government Central Press, Mumbai