ASSESSMENT AUTHORITY-TAMIL NADU
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of ASSESSMENT AUTHORITY-TAMIL NADU
I
1
I
:
MINUTES
44ft MEETING
STATE LEVEL ENVIRONMENT IMPACT
ASSESSMENT AUTHORITY-TAMIL NADU
Date: 22.04.2021
Agenda
No
Description File
No.
Minutes
a)
Confirmation of the minutes of the
440th meeting of the Authority held
on20.04.2021
The minutes of the 440th meeting of the
Authority held on 20.04.2021was confirmed.
b)
The Action taken on the decisions of
the 440th meeting of the Authority
held on 20.04.2021.
The Member Secretary tabled the action taken
report on the decisions of the 440th meeting and
discussed the details.
I To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone &
Gravel quarry lease over an extent of
1.68.0 Ha at S.F.Nos.
80/3,90/4,90/5,90/6,90 117 & g0/19 at
Melur Village, Kulathur Taluk,
pudukkottai District. Tamil Nadu by
Tvl.Sai Hridham Infraa (P) lrd
8294 After detailed discussions, the Authority noted
as follows.
l. The project proponent Tvl.Sai Hridham
Infraa (P) Ltd has submitted the proposal for
the grant of Terms of Reference with Public
Hearing Proposed Rough Stone & Gravel
quaruy lease over an extent of 1.68.0 Ha at
S.F.Nos. 80/3,80/4,80/5,80/6,80117 & 80/19
at Melur Village, Kulathur Taluk,
pudukkottai District.
In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommended the
proposal for the issue of the following Terms
of Reference along with public hearing for
the proposed project among others:
a. Restricting the maximum depth of
mining up to 41m (35mofRoughSone,
2 m of weatlrered rock & 4 m of Crrav{
considering the environmental
impacts due to the mining, safety ofthe working personnel and follo*iy
2.
CHAIMEMBER.leGro*"7'n --,
MEMBEfr-SEIAA.TN
MINUTTS OF THE 44I,t MEETING OF .tHE STATE LEVEL ENvIRONMENT IMPACT
ASSESSMENT AUTHORITY HELD ON 22.04.2021.
Page2 of37
\^
the principle of the sustairlable
mining and the same was accePted
by the proponent. Consequently the
maximum minable quantities of
117040 Cu.m of rough stone, 15680
Cu.m of weathered rock & 41292
Cum of gravel are permitted for
mining over five years and the EIA
may be prepared considering the
ultimate depth as 41 m.
b. The TOR is issued onlY for the
rectangular section excluding
remaining area on the eastem side
bearing SF. No.80/17. Hence, the
project proponent shall revise mining
plan, only for the rectangular section
excluding remaining area on the
eastern side bearing SF. No.80/17.
c. The project proponent shall furnish
revised proposal for green belt area
including said area on the eastem
side bearing SF. No.80/17.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the recommendation of SEAC and as
MEMBBR '"'[6OON
,ro@Page 3 of37
SE,IAA-TN
accepted by the proponent, the ultimate
depth of mining is restricted to 41m (35m of
RoWh stone,2 m of weatlrercd rock & 4 m of
Gmvel) considering the environmental
impacts due to the mining, safety of the
working personnel and following the
principle of the sustainable mining and the
same was accepted by the proponent.
Consequently the maximum minable
quantities of 117040 Cu.m of rough stone,
15680 Cu.m of weathered rock & 41292
Cum of gravel are permitted for mining over
five years and the EIA may be prepared
considering the ultimate depth as 4l m
As per the recommendation of SEAC, theI
TOR is issued only for the rectangular I
section excluding remaining area on ,n. I
I
eastern side bearing SF. No.80/17. Hence, I
the project proponent shall revise mining I
plan, only for the rectangular section I
I
excluding remaining area on the eastern side I
bearing SF. No.80/17. I
I
As per the MoEF& CC office memorandum I
F.No.22-65 12017-IA.Iil dated: 30.09.20201
and, 20.10.2020 the proponent shall fu-ish I
the detailed EMP, mentioning all the CER I
activities as committed and the .or".*. I
raised during public hearing meeting & the I
action plan to mitigate the concerns. I
2.
a
2. To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone &
8322 After detailed discussions, the Authority
unanimously accepts the recommendation ofSEAC and decided to grant Terms of Reference
MEMBER sBcf#anva'Yt ,
METUBE{ CHAISEIAA.TN
Page 4 of37
Gravel quarry lease over an extent
0.85.0 ha at S.F.Nos. 52
Ekkatatampalayam Village,
Perundurai Taluk, Erode District,
Tamil Nadu by Tmt.G.BanugoPal
(ToR) with Public Hearing under cluster for I
undertaking the combined Environment Impact I
Assessment Study and preparation of ,.nurut. I
Environment Management Plan subject to the I
conditions as recommended by SEAC & normal I
condition in addition to the following condition. I
I
1. As per the recommendation of SEAC I
I
and as accepted by the ProPonent, the ]
ultimate depth of mining is restricted to
37 m (Rough stone mining firom tlre exising
pitof 22m) considering the environmental
impacts due to the mining, safety of the
working personnel and following the
principle of the sustainable mining and
consequently the maximum minable
quantities of 49320 cu.m of Rougfr sone
are permitted for mining over five years.
I Z. As per the MoEF& CC officeII memorandum F.No.22-6512017-IA.IllII dated: 30.09.2020 and 20.10.2020 theI
I proponent shall furnish the detailed EMPI
| .teffi' mentioning all the CERI
I activities as committed and the concernsI
I raised during public hearing meeting &I
I the action plan to mitigate the concerns
of
at
J. To consider the proposal for the grant
of Terms of Reference with Public
Hearing for the Proposed Rough
Stone & Gravel Quarry lease over an
extent of 1.37.0Ha in
S.F.Nos.80/1E1, 80/182, 80llE4 of
Pachapalayam Village, sulur Taluk,
8297 After detailed discussions, the Authority noted
as follows.
1. The Project Proponent, Thiru.M.Ramasamy
has submitted the proposal for the grant of
Terms of Reference for the Proposed
Rough Stone & Gravel Quany lease over
MEMBER SECIMTARY7'" ---
nne nr6n c 19N
Page 5 of37
SEIAA.T
Coimbatore District, Tamil Nadu
by Thiru.M.Ramasamy| - extent of 1.37.0Ha in S.F.Nos.80/1E1,
I 80/1E2. 80llE4 of Pachapalayam Village,
I sulur Taluk. Coimbatore District.
lZ. In the 208'h meeting of SEAC held onI
| 24.03.2021, the SEAC has recommend the
I RroRosal for the issue of the following
I Terms of Reference along with public
I hearing among others:
I
| , Restricting the maximum depth of
| *ining up to 33m (30m of Rough
I rtone & 3m of Gravel) considering
| ,he environmental impacts due to the
I .ining, safety of the working
I nersonnel and following the principle
I of the sustainable mining and the
I rame was accepted by the proponentI
I .onsequently, the maximum minable
quantities of 20,955cu.m of Rough
stone & 2850cu.m of Gravel are
permitted for mining over five years.
3. On verifying the form-1 & approved mining
plan the maximum minable quantities for ]
the restricted ultimate depth of 33m is I
20,955cu.m of Rough stone & 6477 cu.m of I
Gravel whereas in the SEAC minutes the I
gravel quantity is typed inadvertentfy u. I
2850cu.m. I
In view of the above, the Authority unanimourf, I
accepts the recommendation of SEAC ana I
decided to grant Terms of Reference (ToR) |with Pubtic Hearing under cluster for I
undertaking the combined Environment ImRact I
MEMBER sBckanv 7?--ME[6ER ,rorM1
Page 6 of37SEIAA-TN
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
l. As per the recommendation of SEAC and as
accepted by the proponent. the ultimate
depth of mining is restricted to 33m (30m of
Rough stone & 3m of Gravel) considering
the environmental impacts due to the mining,
safety of the working personnel and
following the principle of the sustainable
mining and the same was accepted by the
proponent consequently, the maximum
minable quantities of 20,955cu.m of Rough
stone & 6477 cu.m of Gravel are permitted
for mining over five years.
2. As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.Ill dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
4. To consider the proposal for the grant
of Terms of Reference with public
hearing for the Proposed Rough
Stone Quany lease over an extent of
1.05.0Ha in S.F.Nos.50/2 of
Ekkattampalayam Village,
Perundurai Taluk, Erode District,
Tamil Nadu -bv
8313 After detailed discussions, the Authority
unanimously accepts the recommendation of
SEAC and decided to grant Terms of Reference
(ToR) with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
MEMBER'J6'O*'
Page 7 of37
,rm..5 ,/t'.2MEMBER
SEIAA-TN
5.
Thiru.P.VenkatachalamI condition in addition to the following condition.
I
I t. As per the recommendation of SEAC
I und as accepted by the proponent, theI
I ultimate depth of mining is restricted to
I l, m (Rough srcne mining fiom ttre CIdstingI
I pit of l0 m) considering the environmentalI
I i*pacts due to the mining, safety of the
working personnel and following the
principle of the sustainable mining and
consequently the maximum minable
quantities of 7\,7l6cu.m of Rough stone
are permitted for mining over five years.
2. As per the MoEF& CC office
memorandum F.No.22-6512017-IA.III
dated: 30.09.2020 and 20.10.2020 the
proponent shall furnish the detailed
EMP, mentioning all the CER activities
as committed and the concems raised
during public hearing meeting & the
action plan to mitigate the concerns.
To consider the proposal for the grant
of Terms of Reference with public
hearing for the Proposed Rough
Stone & Gravel Quany lease over an
extent of 2.99.5Ha in S.F.Nos.86/3 ofPonnamangalam Village,
Thirumangalam Taluk, Madurai
District, Tamil Nadu by
Thiru. S.Vishnuvarthan
832t After detailed discussions, the Authority
unanimously accepts the recommendation ofSEAC and decided to grant Terms of Reference
(ToR) with Pubtic Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
l. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
MEMBER s"cMon"-
^hMEIVf66 .,*MVSEIAA.TN
Page 8 of37
.ro'O#snMEMBER SE
Page 9 of37
depth of mining is restricted to 32 m (30rn of
RoWh stcne &2 m of Gravel) considering the
environmental impacts due to the mining,
safety of the working personnel and
following the principle of the sustainable
mining and consequently the maximum
minable quantities of 4, 92,4721w.m of
Rough stone &49,680cu.m of Gravel are
permitted for mining over five years.
As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.Ill dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
After detailed discussions,
as follows.
the Authority noted
'fhiru.M.Sengottuvel has submitted the
proposal for the grant of Terms of
Reference with public hearing for the
Proposed Multi Coloured Granite Quarry
lease over an extent of 2.285Ha in
S.F.Nos.503/1 of Sithampoondi Village,
Paramathivelur Taluk, Namakkal District,'
2. In the 208th meeting of SEAC held on
24.03.2021. the SEAC has recommend the
proposal fbr the issue of the following
Terms of Reference along with public
hearing among others:
a. Restricting the maximum depth of
8329To consider the proposal for the grant
of Terms of Reference with Public
hearing for the ProPosed Multi
Coloured Granite Quarry lease over
an extent of 2.28.5Ha in
S.F.Nos.503/1 of SithamPoondi
Village, Paramathivelur Taluk,
Namakkal District, Tamil Nadu -bY
Thiru.M.Sengottuvel
TARY MSEIAA.TN
Project ProPonent,
I
mining up to 33m (30m
multicoloured Granite, 2m weathered
rock & lm gravel) considering the
environmental impacts due to the
mining, safety of the working
personnel and following the principle
of the sustainable mining as well as
considering level of ground water
table and consequently the maximum
minable quantities of 16,986cu.m ofMulti - Coloud Granite, 4422cu.m ofWeathercd Rock & 2628cu.m of Gravel
are permitted for mining over five
years.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition. ]
l. As per the recommendation of SEAC urrO u, I
I
accepted by the proponent, the ultimate I
I
depth of mining is restricted to 33 m (30m I
multicoloured Granite, 2m weathered rock & I
I
lm gravel) considering the environmental I
I
impacts due to the mining, safety of the I,Iworking personnel and following the
I
I
principle of the sustainable mining as well as I
considering level of ground water table and I
consequently the maximum recovery of I
MEMBER spcJ4nv
Page l0 of37
Mn';EDffiffi
SEIAA-TN
2.
16,986 cu.m of Multi - Colotnred Granite is
(ROM-I8310 Cu.m & Granite waste 11324
Cu.m) permitted for mining over five years.
As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.II dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
7. Note to Consider for the proposal 18195
seeking environmental clearance lor I
After detailed discussion, the Authority I
unanimously accepts the recommendation of I
I
SEAC and decided to grant Environmental I
Clearance subject to the conditions * |
recommended by SEAC & normal condition in I
addition to the following condition. I
I
1. The proponent shall ensure that the treated I
sewage should not be disposed directlV or I
indirectly to the nearby water bodies under I
any circumstances I
I
2. As per the MoEF& CC office memorandum I
F.No.22-65l2oll-lA.III dated: 30.09.2020 I
and 20. 1O.2O2O the proponent shall fumish I
the detailed EMP t@, mentioning I
CER activities for Rs. 167 lakhs as
committed and the CER activities shall be
I .urri.a out before obtaining CTo fromI
I TNPCB.I
I I The proponent has to submit the details of
I ar* Activities to be carried out with actionI
I ntun while submitting application for CTE
Construction of proposed
Construction of High Raise
Residential Building by M/S.
Baashyaam Constructions Pvt Ltd at
Old No. 277(part) New T.S.No.l4l7,
Block No.7l of Kodambakkam
Village, Mambalam Taluk, Chennai
District by M/S. Baashyaam
Constructions Pvt Ltd - Sl. No 8(a) of
the Schedule - Building and
Construction Projects- as per EIA
Notification 2006 As Amended.
MEMBER.,}6,o*"
Page Ll of37
.ro'Q6Y.vlt/
MEMBERSEIAA-TN
from TNPCB
8. To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone &
Gravel quarry lease over an extent of2.02.3 Ha at S.F.Nos. 176/tA,
17615A, 176/6A of Marapparai
Village and S.F.No. 316128.2 of
Paruthipalli Village-, Tiruchengode
Taluk, Namakkal District, Tamil
Nadu by Thiru. S.Rangasamy
83 12
I
After detailed discussions, the Authority
unanimously accepts the recommendation ofSEAC and decided to grant Terms of Reference
(ToR) with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
depth of mining is restricted to 37m (35 m ofRough stone &2 m of Gravel) considering
the environmental impacts due to the mining,
safety of the working personnel and
following the principle of the sustainable
mining and the same was accepted by the
proponent. Consequently, the maximum
minable quantities of 70750 Cu.m of Rough
stone & 8050 cu.m of Gravel ure pe.-itted I
I
for mining over five years. I
2. As per the MoEF& CC office *"rnorundr. I
F.No.22-65 12017-IA.III dated: 3O.Og.2l2ol
and,20.10.2020 the proponent shall furni.h I
the detailed EMP, mentioning all the CER I
I
activities as committed and the conce*s I
raised during public hearing meeting & the I
action plan to mitigate the concern, r*ib Ie.I
MEMBBR sBcL(nvv-; s
ME6 "^offihPage 12 of 37
SEIAA-TN
After detailed discussions, the
as follows.
1. The Project
Authority noted
Proponent.
Thiru.P.Adhimoolam has applied for Terms
of Reference for the proposed Rough Stone
qualry lease over an extent of 4.00.0 Ha at
S.F.Nos. 135 Part -7 at Iyukunam Village,
Kilpennathur Taluk, Thiruvannamalai
District.
2. In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommend the
proposal for the issue of the following
Terms of Reference along with public
hearing among others:
a. The complaint letter indicating some
allegations may be discussed in the
Public-hearing meeting
b. Restricting the maximum depth of
mining up to 35 m (AGL) of rough
stone considering the environmental
impacts due to the mining, safetY of
I the working Personnel and
following the principle of the
sustainable mining and
consequently the maximum minable
quantities of 5,29,180 cu.m of
rough stone are Permitted for
mining over five years.
c. The project proponent shall furnish
revised mining Plan maximum
depth of mining uP to 35 m (AGL)
8335To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone
quarry lease over an extent of 4.00.0
Ha at S.F.Nos. 135 Part - 7 at
Iyukunam Village, Kilpennathur
Taluk, Thiruvannamalai District,
Tamil Nadu by Thiru. P.Adhimoolam
't{7"roffi9MEMBER SECRETARY
Page 13 of37
MEMBERSEIAA-TN
ofrough stone over five years.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As recommended by SEAC, the complaint
letter indicating some allegations may be
discussed in the Public-hearing meeting
2. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
depth of mining is restricted to 35m AGL
(From top) considering the environmental
impacts due to the mining, safety of the
working personnel and following the
principle of the sustainable mining and the
same was accepted by the proponent.
Consequently, the maximum minable
quantities of 529180 Cu.m of Rough stone is
permiued for mining over five years.
3. As recommended by SEAC, the project
proponent shall fumish revised mining plan
for ultimate depth of mining of 35 m (AGL)
ofrough stone over five years.
4. As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.IIL dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
MEMBER SECL{RY aro,Page 14 of 37
SEIAA.TN
aror*ffi'
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns
After detailed discussions, the Authority noted
as follows.
l. The Project Proponent, Thiru.K.Govardhan
Chowdari has aPPlied for Terms of
Reference for the proposed Rough Stone
quarry lease over an extent of 2.00'0 Ha at
S.F.Nos. 303 (Part-1) Athimugam Village,
Shoolagiri Taluk, Krishnagiri District,
Tamil Nadu.
2. In the 208th meeting of SEAC held on
I z+.01.2021, the sEAc has recommend the
proposal for the issue of the following
Terms of Reference along with public
hearing among others:
a. Restricting the maximum depth of
mining uP to 40 m [l8m (AGL) +
21m (BGL) of Rough stone & 1 m
of toPsoill considering the
environmental imPacts due to the
mining, safetY of the working
personnel and following the
principle of the sustainable mining
and consequentlY the maximum
minable quantities of 4, 51,126
cu.m of Rough stone &16,100 cu'm
of Gravel are Permitted for mining
over five Years.
3. On verifying the approved mining plan,
Form-l and other documents fumished by
8340To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone
qualry lease over an extent of 2.00.0
Ha at S.F.Nos. 303(Part-l)
Athimugam Village, Shoolagiri
Taluk, Krishnagiri District, Tamil
Nadu by Thiru.K.Govardhan
Chowdari
MEMBER
Page 15 of37
TARYSEIAA.TN
I
I
the proponent, it was noticed that the
maximum minable quantity of rough stone
for the restricted depth of 40m is 454076
Cu.m of rough stone & 16,100 cu.m of Top
soil which is typed inadvertently as 451126
cu.m of Rough stone &16,100 cu.m ofGravel and also the survey number is typed
inadvertently as S.F.No. 303 (Part) instead
of S.F.No. 303 (Part-l) in the minutes of208th meeting of SEAC held on
24.03.2021
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
depth of mining is restricted to 40 m [lgm(AGL) + 2lm (BGL) of Rough stone & I m of
topsoil] considering the environmental
impacts due to the mining, safety of the
working personnel and following the
principle of the sustainable mining and the
same was accepted by the proponent.
Consequently, the maximum minable
quantity of 454076 Cu.m of rough stone is
permitted for mining over five years.
MEMBER srcjPdanvh,r .rffih
Page 16 of37
MEIyfBET*SEIAA-TN
2. As per the MoEF& CC office memorafldum
F.No.22-65 12017 -lAjll dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concems.
ll To consider the proposal for the grant 18412
of Terms of Reference with Public I
Hearing Proposed Rough Stone & |
Gravel quarry lease over an extent of I
4.27.4 Ha at SF. No.469llB tol
46916B,476ll to 47614, O, I
Nadanoor Village. Alangulam Taluk. I
Tenkasi District by Thiru. K. I
Rajkumar I
After detailed discussions, the Authority noted
as follows.
l. The Project Proponent, Thiru. K. Rajkumar
has applied for Terms of Reference for the
proposed Rough Stone & Gravel quarry
lease over an extent of 4.27.4 Ha at SF.
No.469l lB to 46916B.,47611 to 47614, A.P
Nadanoor Village, Alangulam Taluk,
Tenkasi District.
2. In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommend the
proposal for the issue of the following
Terms of Reference along with public
hearing among others:
a. Restricting the maximum depth of
mining up to 37m (35 m of Rough
I stone &2 m of Gravel) consideringI
I the environmental imPacts due toI
I the mining, safety of the workingI
I personnel and following theI
I principle of the sustainable miningI
I und the same was accepted bY the
I
I nroponent. ConsequentlY, the
I maximum minable quantities of
677435 cu.m of Rough stone &
MEMBERT[ro*" .ro1*ffi\4SBIAA-TN
PagelT of37
%7MEMBER
70302 cu.m of Gravel are permitted
for mining over five years.
3. On verifying the approved mining plan, the
maximum minable quantity of rough stone
for the restricted depth of 37m is 677425
Cu.m which is typed inadvertently as
677435 cu.m of Rough stone in the minutes
of 208th meeting of SEAC held on
24.03.2021
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
depth of mining is restricted to 37m (35 m ofRough stone &2 m of Gravel) considering
the environmental impacts due to the mining,
safety of the working personnel and
following the principle of the sustainable
mining and the same was accepted by the
proponent. Consequently, the maximum
minable quantities of 677425 Cu.m of Rough
stone & 70302cu.m of Gravel are permitted
for mining over five years..
2. As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.Iil dated: 30.09.2020
MEMBER src{zlnv7";
MEMdR--
Page 18 of37SEIAA.TN
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
12. To consider the proposal for the grant
of Terms of Reference with Public
Hearing Proposed Rough Stone
quarry lease over an extent of 1.16.0
Ha at S.F.Nos. 313A2,31382,313C2,
313E2 & 3l3G at Palaiyur Village,
Pollachi Taluk, Coimbatore District,
Tamil Nadu
A.Thirumalaisamy
by Thiru.
833 I Afier detailed discussions, the Authority
unanimously accepts the recommendation of
SEAC and decided to grant Terms of Reference
(ToR) with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the MoEF& CC office memorandum
Ir.No.22-65 12017-lA.lll dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
13. Note to Consider for the issue of
Environmental Clearance for the
Proposed Construction of
Warehouse/Lo gistics/Storage
Building Project M/s. SHIRINA
Industrial & Logistics Park Pvt. Ltd.,
SECURA Logistics Park Pvt. Ltd.,
ERPL Industrial & Logistics Park
P\4. Ltd.,in Survey No: 98/2, 100,
101, l02ll, t02/2, 10213, 103/14.,
7650 After detailed discussions, the Authority
unanimously accepts the recommendation of
SEAC and decided to grant Environmental
Clearance subject to the conditions as
recommended by SEAC & normal condition in
addition to the following condition.
1. The proponent shall ensure that the industrial
park shall be utilized only for
Warehouse/Logistics /Industrial Storage
/Light & Heavy engineering & assembling of
MF],MBF],R S ARYt\'n-.
rvrrrtrBn CH^MNSEIAA-TN
Page 19 of37
103/18, 10312, 106, 10713, 10714,
10715, t0gl2, l17llA, lt7llBl,tt7lIB2, 155/lA, 15512, t5513,
15611, 160ll, t6012, 16111, 16U2,
t6ll3A, 161/38, 162, r63ltA,163llB, 164ll, 16412, 165ll, 165/2,
16611, 16612, 16613, 167, 769, 169,
170, 171 of Vishnuvakkam Village
&. 27711. 277/2, 27gllc, 27912,
27 8l I A, 27 g/ lB, 27 g I l, 279 12, 27 g 13,
280, 2gl, 292, 29413, 2g5l1A,
285/tB, 2g5llc, 2g5ltD, 295/lE,
285ltF, 29512, 29513, 2g6llA,
286ltB, 29612, 28613A, 2g613P.,
28614A, 286/48 of Karikalavakkam
Village, Tiruvallur Taluk, Tiruvallur
District-For Environmental
Clearance - Category 82 - 8(a) ofthe Schedule - Building and
Construction Projects As per The
EIA Notification 2006 As Amended
Components - IT Hardware, Packaging
Material, e-corlmerce FMCG Retail
Products, Pharmaceutical Products, Fabric,
Apparel's, Fiber Glass; Ready to assemble
furniture, fixtures, Appliances, Engineering
Products, Automobiles Accessories,
Electronic Goods, Non Agricultural Raw
produce storage; Storage of only non-
flammable Chemicals within threshold limits
as per Schedule II & m of Manufacture,
storage and import of hazardous chemical
rules, 1989 as amended.
The proponent shall ensure that there shall
not be any Storage of non-flammable
Chemicals more than the threshold limits as
committed within the said Industrial park as
per Schedule II & III of Manufacture,
storage and import of hazardous chemical
rules, 1989 as amended.
As recommended by SEAC and as accepted
by the proponent, the project proponent shall
provide green belt of 20yo excluding OSR
area all along the periphery of the proposed
industrial and logistic park.
As recommended by SEAC and as acceRted ]
by the proponent, the percentage of *.u I
allotment to the individual
sector/commodities shall be as follows
2.
4.
a. FMCG/Consumer
Apparel's :40o/o
b. Electronic and
Durables/
IT hardware
MEMBERTTk^.t
Page 20 of37
a,)1'huffi. "r^rM\M
SEIAA.TN
c.
Assembling :20o/o
Auto ancillary assembling and Allied
storage : l5%o
Light and Heavy Engineering l5%o
Logistics Services (3PL/4PL) :10oh
d.
{. As recommended by S and as accepted
by the proponent
consume fresh w of 180 KLD and it must
be sourced the Bore well located at
project si with prior approval from the
t Authority.
6.
by the proponent, the proponent shall
provide the Grey water treatment plant of
capacity of 100 KLD to treat grey water
generation of 97 KLD and shall be operated
& maintained effectively and continuously'
7. As recommended by SEAC and as accepted
by the proponent, the proponent shall
provide the Sewage treatment plant of
capacity 70 KLD to treat the Black water
generation of 56 KLD and shall be operated
& maintained effectively and continuously'
As recommended by SEAC and as accepted
by the proponent, the proponent shall operate
and maintain the Sewage Treatment Plant &
Grey Water Treatment Plant efficiently and
8.
continuously to bring the quality of treated
sewage to satisfy the discharge standards
prescribed by the CPCB at all times.
g. As recommended by SEAC and as accepted
MEMBER
Page2l of37
RETARY%'\ c'a66Y
SBIAA-TN
the project shall
by the proponent, the proponent shall recycle
and reuse the Treated Sewage of 147 KLD
for toilet flushing (43.5 KLD) and for Green
belt development (103.5 KLD) on land
within the premises.
10. The proponent shall ensure that there shall
not be any trade effluent generation within
the premises of said Industrial park as
committed.
11. As per the MoEF& CC office memorandum
F.No.22-65 12017-IAJil dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed below with
the action plan to mitigate the concerns
while applying for CTE from TNpCB. The
CER activities shall be carried out before
obtaining CTO from TNPCB.
S.
NOCER
ActivityCost ofCER
inLakhs
Description Name of Selected Village(Within 5 Km from project
site)
1 Infrastructurecreation fordrinkingwater supply
10 The amount will be dividedand spent One time forthese villages based on therequirement. Building ofOverhead tanks, Pipelinesupply & Hand pumps etc.,will be carried out.
VishnuvakkamKarikalavakkamVilapakkam
I2J
2. Health campsalong withfree medicinedistribution
5 Health camps will beconducted once a year forscreening of diseases andproviding medicines free ofcost.
l. Vishnuvakkam2. Karikalavakkam3. Vilapakkam4. Veeraragavapuram5. Kilanur
J. Electrificationincludingsolar power
10 The areas requiringelectrification such aspublic road, Schools andCommon areas will be
VishnuvakkamVeeraragavapuramKilanur
I2J
MEMBER sncfu(nv h^;MEA,4BE'R-- crl^k:fu
Page22 of37SEIAA.TN
selected. Solar poweredlamps will be installed.
4. TreePlantation invillages
6 Trees will be planted alongroads for providing shade
over a period of 7 years.
Public area such as schools,Hospitals, temples will also
be selected for tree planting.
l. Vishnuvakkam2. Karikalavakkam
3. Vilapakkam
Total 31 Lakhs
14. Note to Consider for the issue of 17592
Environmental Clearance for tne I
proposed construction of M/s. Vels I
Medical College and Hospital " I
S.F.Nos. l17lLD, 11712. l1713,l
ttll4A, tt7l4B, llTllc. l17B.l
1 l8/lA, 1 18/18, l18l2.l l8/3. I l8/4. I
I 18/5A, I l8/5B,1 18/6.1 18/7. I l8/8. I
118/9 At Natham Village, Ponneri I
Taluk, S.No l2l1, 2,3,4,5 & 6, 13, I
14, 17, l42llB, 14212, 143, l44llA2,l
t44ltB3B, t4412,14413, l44l4,l
14415, 144/6A, l5l/1A, l5l/lBl,l15UlB2, 15112P.,151/3, 152, 153/1.
I
15312, l54ll, 15412, 158/2B, I
158/3A2over an extent of f S.S0S ha I
Let Uaniakaranai Village. Uthukottai I
Itduk, S.No 327nA. 327tB.ltl1327128,
At Bandikavnur Villaee, I
I Ponneri Taluk, Thiruvallur District. I
I ramil Nadu by Vels Institute of
I
I Science, Technology & Advanced I
| ,,r0,., (VISTAS) - Category 82 - I
lrtul o, the Schedule - Buildirg *a I
lconstruction Projects As e.. rn.
I
I EIA Notification 2006 As Amended I
After detailed discussions, the AuthoritV I
unanimously accepts the recommendation of I
SEAC and decided to grant Environmental I
Clearance subject to the conditions ^ |
recommended by SEAC & normal condition in I
addition to the following condition. I
I
l. As recommended by SEAC and ut I
accepted by the proponent, the proposed I
project shall be constructed only fo. I,I
Phase -1 of total Built up area of 54,360 |
Sq.m in l8 blocks; the proposed Rroject I
shall have a plot coverage of 21.80 % of
total plot area of 1,55,050 Sq.m.
2. As recommended by SEAC & as Per the
planning permission obtained from
deputy Director, DTCP vide
Na.Ka.No. 55012020lTiruvallur-2 dated
21.09.2020, the total built-up area is
restricted 54360.68 sq.m with GroundI
I floor & First floor in a plot area of
I rs5o5o Sq.m.I
I
I 3. As recommended by SEAC and as
I u.cepted by the proponent, the parkingI
I of 11.7 o , Roads coverage of 16.03 %o,
I
I creen belt of 33o/o, OSR of l0o/o and
area o{' 7.44 o of the total plotvacant
RE,R SMRETARY
o/\'r ,.' /MEMtrfR CHAIMEMBE
Page23 of37
SEIAA-TN
,tl
4.
area shall be maintained for the Phase -lconstruction activity.
As recommended by SEAC and as
accepted by the proponent, the project
proponent shall ensure that the 33Yo ofgreen belt developed shall be maintained
properly and within the premises and at
the periphery of the site and the land area
statement shall be as follows
5. As recommended by SEAC and as
accepted by the proponent, the total
water required for Phase - I activity shall
be 358 KLD out of which 20KLD is for
Stream-A (Lab, Animal House, OT,
Gynae ward) & 338 KLD is for Steam-B
(P/OP/Visitors/Hostels, Students,
7.
Quarters, Staff & Laundry).
As recommended by SEAC and as
accepted by the proponent, the
freshwater drawl of 243 KLD shall be
taken from external sources and treated
water of I I5KLD shall be recycled for
flushing purpose.
As recommended by SEAC and as
S.No Description Area
(Sq.m)
Percentage
(%)
IBuildingcoverage
33846.17 21.80
2. Parking r8130.00 11.70
J. Roads 24861.00 16.03
4. Green Belt 5l 166.50 33.00
5. OSR 15s05.00 10.00
6. Vacant area I1541.33 7.44
Totalp ot Area 1s5050.00 r 00.00
MEMBER.Tk o*">1'b-
ME}4BE[-- cmtffiPage 24 of 37
SEIAA-TN
accepted by the proponent, trade Effluent
of ISKLD generated from Stream-A
shall be treated in the Effluent treatment
plant of capacity 50KLD as proposed.
8. As recommended by SEAC and as
accepted by the proponent,, sewage of
112 KLD & grey water of 193 KLD
generated from Stream-B shall be treated
in Sewage Treatment Plant of capacity
300 KLD & Grey Water Treatment Plant
of capacity 400 KLD respectively as
proposed
9, As recommended by SEAC and as
accepted by the proponent,, the
proponent shall operate and maintain the
Sewage Treatment Plant, GreY water
Treatment Plant & Effluent Treatment
Plant efficiently and continuously to
bring the quality of treated
sewage/treated trade effluent to satisfu
the discharge standards prescribed by the
CPCB at all times.
10. As recommended by SEAC and as
accepted by the proponent,, the
proponent shall ensure that the treated
water of I 15 KLD shall be recYcled
within the system for flushing purpose,
treated water of 179.2 KLD shall be
utilized for Green belt development and
treated water of ll.8 KLD shall be used
for firefighting /road washing as per
requirement basis.
MEMBER
Page 25 of37
aror#qSEIAA-TN
I l. As recommended by SEAC and as
accepted by the proponent, the proponent
shall ensure that the total treated water of306 KLD from ETP, GWTP & STp
shall be recycled, reused within the
premises and will not be discharged
anywhere outside the campus.
12. As recommended by SEAC and as
accepted by the proponent, the project
proponent shall ensure that the Solid
waste generated in the hospital and
college shall be collected in colour-
coded bins as per Bio Medical Waste
Management Rule 2016 norms and taken
to BM waste storage area. Solid waste
generated in hostel, quarters shall be
segregated as biodegradable/non-
biodegradable waste generation
calculated as per CPHEEO Manual onl
MSW Management, 2000 Chapter 7. I
I
13. As recommended by SEAC and as I
accepted by the proponent, the project
proponent shall ensure that the
biomedical waste of quantity
approximately 154 Kglday shall be
disposed to authorized CBWTF.
14. As recommended by SEAC and as
accepted by the proponent, the project
proponent shall ensure that the
Biodegradable food waste; garden waste
of approximately 537 Kg/day & STp
sludge of 100Kg/day shall be processed
in Biomethanization plant and the
MEMBER
Page26 of37
cHA/ffii\'^>1'r1EN4BTR
SEIAA-TN
compost shall be used as manure for the
green belt development. Non-
Biodegradable paper, Plastics,
containers, cartons etc., approximately of
797 Kglday shall be disPosed to
authorized recycler.
15. As recommended by SEAC and as
accepted by the proponent, the project
proponent shall ensure that the ETP
sludge of 2 Kglday shall be disposed to
authorized TSDF. The Hazardous waste
generation of 0.5 Tlyear used/spent oil
from the DG shall be collected stored
and disposed to authorized recycler.
16. As per the MoEF& CC office
memorandum F.No.22-6512017-IAJII
dated: 30.09.2020 and 20.10.2020, the
proponent shall furnish the detailed EMP
as proposed for Rs.400 Lakh, which
includes CER activities of Rs.50 Lakhs
to TNPCB, mentioning all the CER
activities as committed below with the
action plan to mitigate the concerns
while applying for CTE from TNPCB.
The CER activities shall be carried out
before obtaining CTO from TNPCB.
S.No CER Activity Cost[Rs.Lakhs
Description Name of theIdentifiedVillases
i Solid wasteManagementfacility
5 Installation of Dustbins for waste
segregation. Providing Gloves,Mask and other safety measure,transport of solid waste.
ManjankaranaiBandikavanorNathamKannigaipairThatchoor
MEMBER.r"Mto*t .ror*Q6"r
Page27 of37
#kSEIAA-TN
VettipalayamJanappanchatramPanchety
2. Infrastructuredevelopmentlaying roadsand busshelters.
l5 Roads will be laid in interior ofvillages for easy traffic. Busshelters will be built near schooland hospital bus stops as priority.
ManjankaranaiBandikavanorNathamKannigaipair
3. Infrastructuredevelopment -RWHstructures(ponds, drainsetc.)
l0 To recharge ground aquifers,Rainwater ponds will bedeveloped in area adjoining thehospital campus. In villagesdesilting of ponds will be carriedout.
ManjankaranaiBandikavanorNathamJanappanchatramPanchety
4. skillDevelopment& Training forwomen
5 Training recharge groundaquifers, Rain water ponds willbe developed in area adjoiningthe hospital campus. In villagesdesilting of ponds will be carriedout.
ManjankaranaiBandikavanorNathamKannigaipairThatchoorVettipalayamJanappanchatramPanchety
5. Tree Plantation l0 Shade providing trees such asNeem, Poovarasu, Mango treeswill be planted along roadside, inpublic places over a period of 7years.
ManjankaranaiBandikavanorNathamKannigaipairThatchoorPanchety
6. Health campsalong with freemedicinedistribution
5 Health camps and eye check upcamps will be conducted once ina year in mobile vans by hospitalstaff . Medicines will be providedfree of cost.
ManjankaranaiBandikavanorNathamThatchoorVettipalayamJanaooanchatram
Total Cost (Rs.) 50 Lakhs
To consider the proposal for the grant
of Environmental Clearance for the
Proposed Sand quarry lease over an
extent of 12.00.0 Ha at
S.F.Nos.495ll (Part), Agaraelathur
Village, Sirkazhi Taluk,
Nagapattinam District, Tamil Nadu
by M/s.The Executive Engineer
Public Works Department
After detailed discussions, the Authority noted
as follows.
l. The Project Proponent, M/s. The Executive
Engineer Public Works Department has
applied seeking Environmental Clearance for
the Proposed Sand quany lease over an
extent of 12.00.0 Ha at S.F.Nos. 49511
(Part), Agaraelathur Village, Sirkazhi Taluk,
Myladuthurai District.
7253
MEMBER TffiTo*n ."o##-u"\'Page 28 of37
kSEIAA-TN
15.
2. In the 208th meeting of SEAC hetd on
24.03.2021, the SEAC has recommended the
proposal for grant of Environmental
Clearance subject to the following conditions
among others:
a. Permitted ultimate depth of mining
is restricted to theoretical bed level.
Hence the quantity that shall be
mined up to theoretical bed level as
per the approved mining plan is
1,98,175m3.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Environmental Clearance
subject to the conditions as recommended by
SEAC & normal condition in addition to the
following condition.
l. As per the recommendation of SEAC, the
Permitted ultimate depth of mining is
restricted to theoretical bed level. Hence the
quantity of sand that shall be mined up to
theoretical bed level as per the approved
mining plan is l. 98,1 75m3.
2. As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.Ill dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed with action
plan while applying for CTE from TNPCB.
The CER activity shall be carried out before
obtaining CTO from TNPCB
V. MEMBER SECRETARY
Page29 of37
.,,MVSEIAA-TN
AK
16.Tb consider the proposal for the grant
of Environmental Clearance for the
Proposed Sand Quarry over an extent
of 20.00 Ha in Coleroon River at
S.F.No: 32lll (Part) of Vadarangam
Village, Sirkazhi Taluk,
Mayladuthurai District, Tamil Nadu
7254 After detailed discussions, the Authority noted
as follows.
I 1. The Project Proponent, M/s.The ExecutiveI
I Eneineer Public Works Department has
I applied seeking Environmental Clearance forI
I the Proposed Sand quarry lease over an
I extent of 20.00.0 Ha at S.F.Nos. 32t/tI
| (Part), Vadarangam Village, Sirkazhi Taluk,
I Myladuthurai Disrrict.
2. In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommended the
proposal for grant of Environmental
Clearance subject to the following conditions
among others:
a. Permitted ultimate depth of mining is
restricted to theoretical bed level. Hence
the quantity that shall be mined up to
theoretical bed level as per the approved
mining plan is 2,79,364m3.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Environmental Clearance
subject to the conditions as recommended by
SEAC & normal condition in addition to the
following condition. ]
l
1. As per the recommendation of SEAC, the I
Permitted ultimate depth of mining ir l
restricted to theoretical bed level. Hence the I
I
quantity of sand that shall be mined up to I
theoretical bed level as per the approved I
mining plan is 2,79,364m3. I
I
2. As per the MoEF& CC office memorandum I
MEMBER ARYh. r,'
ME*{BtrR ,,^MVSEIAA.TN
Page 30 of37
\\^
F.No.22-65 12017 -l{.Iil dated: 30.09:2020
and 20.10.2020 the proponent shall fumish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed with action
plan while applying for CTE from TNPCB.
The CER activity shall be carried out before
obtaining CTO from TNPCB.
17. To consider the proposal for the grant
of Environmental Clearance for the
Proposed Sand quarry lease over an
extent of 20.00.0 Ha at
S.F.Nos.78211 (Part), Methirivellur
Village, Sirkazhi Taluk,
Mayladuthurai District, Tamil Nadu
by M/s.The Executive Engineer
Public Works Department
7066 After detailed discussions, the Authority noted I
as follows. I
I
1. The Project Proponent, M/s. The Executive I
Engineer Public Works Department has I
applied seeking Environmental Clearance for ]
the Proposed Sand quarry lease over an
extent of 20.00.0 Ha at S.F.Nos. 78211
(Part), Methirivelur Village, Sirkazhi Taluk,
Myladuthurai District.
2. In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommended the
proposal for grant of Environmental
Clearance subject to the following conditions
among others:
a. Permitted ultimate depth of mining is
restricted to theoretical bed level. Hence the
quantity that shall be mined up to theoretical
bed level as per the approved mining plan is
2,53,991m3.I
I
I ln view of the above, the Authority unanimouslyI
I accepts the recommendation of SEAC andI
I decided to grant Environmental ClearanceI
I subject to the conditions as recommended byI
ISEaC & normal condition in addition to the
t
MEMBER srccKanvT>
MEMBER cH^'#ffi\dP
Page 31 of37SEIAA-TN
following condition.
l. As per the recommendation of SEAC, the
Permitted ultimate depth of mining is
restricted to theoretical bed level. Hence the
quantity of sand that shall be mined up to
theoretical bed level as per the approved
mining plan is 2,53,991m3.
2. As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.III dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed with action
plan while applying for CTE from TNPCB.
The CER activity shall be carried out before
obtaining CTO from TNPCB.
18. To consider the proposal for the grant
of Environmental Clearance (EC)
Proposed Rough stone quarry lease
over an extent of 1.05.0ha at S.F.Nos.
l92ll & 19212 of Sathiyamangalam
Village, Kulathur Taluk, Pudukottai
District, Tamil Nadu by M/s. Veeram
Stone P\4 Ltd
8239 After detailed discussions, the Authority
unanimously accepts the recommendation of
SEAC and decided to grant Environmental
Clearance subject to the conditions as
recommended by SEAC & normal condition in
addition to the following condition.
1. As per the MoEF& CC office memorandum
F.No.22-6512017-IA.lil dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed with action
plan while applying for CTE from TNPCB.
The CER activity shall be carried out before
obtaining CTO from TNPCB.
19. To consider the proposal for the grant
of Environmental Clearance (EC)
8136 After detailed discussions, the Authority noted
MEMBER ARY arorffilSEIAA.TN
Page 32 of37
h),
MEMBER
Page 33 of37
as follows.
l. The Proponent, Executive Engineer,
PWD/WRD, has applied for Environmental
Clearance for the proposed Sand quarry over
an extent of 4.90Ha in Palar river bed in
S.F.No. 242(P) in Arumparuthi Village,
Katpadi Taluk, Vellore District.
2. In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommended the
proposal for grant of Environmental
Clearance subject to the following conditions
among others:
a. Permitted ultimate depth of mining is
restricted to theoretical bed level.
Hence the quantitY that shall be
mined up to theoretical bed level as
per the approved mining Plan is
51297m3.
b. Manual Mining shall be carried out
using Bullock carts only restricting
up to 198 Nos. of bullock carts Per
day.
3. On verifying the Form-I, Precise atea
communication letter and Mining Plan
approval letter, it was noticed that the extent
of sand quarry is 4.90 Ha whereas in the
SEAC minute, the extent of sand quarry is
typed inadvertently as 4.94 Ha
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Environmental Clearance for
the proposed Sand quarry over an extent of
4.90Ha in Palar river bed in S.F.No. 242(P) in
Proposed Sand qualry in Palar
riverbed over an extent of 4.90.0 ha
at S.F.No. 242(P) in ArumParuthi
Village, Katpadi Taluk, Vellore
District, Tamil Nadu bY the
Executive Engineer, PWD/WRD
MEMBER CHAIffi\,YISEIAA-TN
Arumparuthi Village, Katpadi Taluk, Vellore
District subject to the conditions as
recommended by SEAC & normal condition in
addition to the following condition.
1. As per the recommendation of SEAC, the
Permitted ultimate depth of mining is
restricted to theoretical bed level. Hence the
quantity that shall be mined up to theoretical
bed level as per the approved mining plan is
51297m3.
As per the recommendation of SEAC,
Manual Mining shall be carried out using
Bullock carts only restricting up to 198 Nos.
ol'bullock carts per day.
As per the MoEF& CC office memorandum
F.No.22-65 12017-IA.Iil dated: 30.09.2020
and 20.10.2020 the proponent shall furnish
the detailed EMP to TNPCB, mentioning all
the CER activities as committed with action
plan while applying for CTE from TNPCB.
The CER activity shall be carried out before
obtaining CTO from TNPCB.
2.
20. To consider the proposal for the grant
of Environmental Clearance for the
Existing Multi Colour Granite
Quany over an extent of 16.12.0 Ha
at S.F. No.516/l , 51814 & 534,
Arasiramani Village, Sankari Taluk,
Salem District by M/s. Tamil Nadu
Minerals Limited
4396 After detailed discussion, the Authority
unanimously accepts the recommendation ofSEAC and decided to request the Member
Secretary, SEIAA to obtain the following details
from the proponent as recommended by SEAC
and place the proposal in the ensuing Authority
meeting for further course of Action.
1. The SEAC has prescribed the amounts for
Ecological remediation (Rs. 6.448 lakhs),
MEMBER snckrnv
Page 34 of37
CH^Ml'4\'SEIAA-TN
VtFMEI\,IBE-R-_
2.
natural resource augmentation (Rs. '8.06 |
lakhs) & community resource augmentation I
(Rs. I 1.284lakhs), totaling Rs. 25J921
Lakhs. Hence the project proponent has to I
I
remit the amount of Rs. 25.792 Lakhs in the I
form of bank guarantee to Tamil Nadu I
Pollution Control Board and submit the I
acknowledgement of the same to SEIAA- |
I
TN. The funds shall be utilized for the I
remediation plan, Natural resource I
augmentation plan & Commurity ..rou... I
I
augmentation plan as indicated in tf,e I
EIA/EMP report. I
The amount committed by the Project
proponent for CER (Rs.6.448 Lakhs) shall
be remitted in the form of DD to the
beneficiary for the activities committed by
the proponent. A copy of receipt from the
beneficiary shall be submitted to SEIAA-TN
The project proponent shall submit the proof
for the action taken bY the state
Government/TNPcB against project
proponent under the provisions ofSection 19
of the Environment (Protection) Ac, 1986 as
per the EIA Notification dated: 14.03.2017
and amended 08.03.201 8.
The project shall fumish the revised letter
obtained from Assistant Director, Deparment
of Geology & Mining.
J.
4.
2t. To consider the proposal for the grant
of Terms of Reference with Public
8303 After detailed discussions, the Authority noted
as follows.
\
MEMBER SBCKaNV
Page 35 of37
%.r/MEMBER
ryA.NCHAIRIIAN
SEIAA-TN
Hearing Proposed Red Gravel &
Ordinary Stone quarry lease over an
extent of 4.55.0 Ha at S.F.Nos.
295/2A, 2g5l2B, 2g5l2D, 23glt,
295 I 4C, 23813 A, 23812 and 238138 at
Keelaramanadhi Village, Kamuthi
Taluk, Ramanathapuram District,
Tamil Nadu by Thiru.M.Karthik
The Project Proponent, Thiru.M.Karthik
has applied for Terms of Reference for the
proposed Red Gravel & Ordinary Stone
quarry lease over an extent of of 4.55.0 Ha
at S.F.Nos. 29512A, 295128, 29512D,
23811, 29514C, 23813A, 23812 and 238/38
at Keelaramanadhi Village, Kamuthi Taluk,
Ramanathapuram District.
In the 208th meeting of SEAC held on
24.03.2021, the SEAC has recommend the
proposal for the issue of the following
Terms of Reference along with public
hearing among others:
a. Restricting the maximum depth
of mining up to l4m (12 m of
Ordinay strrne & 2 m of Gravel)
considering the environmental
impacts due to the mining, safety
of the working personnel and
following the principle of the ]
I
sustainable mining and I
consequently the maximum
minable quantities of 3, 19,531
cu.m of Orldinary stone &68,840cu.m of Gravel are
permitted for mining over five
years.
3. On verifying the Form-l & approved
mining plan the maximum minable
quantities for the restricted ultimate
depth of 14m is 349421 cu.m of
ordinary stone & 68840 cu.m of
Gravel whereas in the SEAC minutes
l.
2.
MEMBER srcffiv"roiM\rVr
Page 36 of37SEIAA.TN
the Ordinary stone quantity is ty
inadvertently as 3119,531 cu.m.
In view of the above, the Authority unanimously
accepts the recommendation of SEAC and
decided to grant Terms of Reference (ToR)
with Public Hearing under cluster for
undertaking the combined Environment Impact
Assessment Study and preparation of separate
Environment Management Plan subject to the
conditions as recommended by SEAC & normal
condition in addition to the following condition.
1. As per the recommendation of SEAC and as
accepted by the proponent, the ultimate
depth of mining is restricted to l4m (12 m of
Ordinaly strrne & 2 m of GmvO considering the
environmental impacts due to the mining,
safety of the working personnel and
following the principle of the sustainable
mining and consequently the maximum
minable quantities of 349421 cu.m of
Ordinary stone & 68,840cu.m of Gravel are
permitted for mining over five years.
2. As per the MoEF& CC office memorandum
F.No.22-65 12017 -IA.lIl dated: 30.09.2020
and 20.10.2020 the proponent shall fumish
the detailed EMP, mentioning all the CER
activities as committed and the concerns
raised during public hearing meeting & the
action plan to mitigate the concerns.
ry-MEMBER a"or H
MEMBER S
Page 37 of37
SEIAA-TN
--\