Apex founded in 2015 , pioneers of the airspace development market
• 2016 – Carried the most comprehensive research in to London’s Rooftops - £54bn
market
• 2017 – Invited to No.10 to roundtable discussions with the PM and the Housing Minister
• 2017 – won the World Architectural News Award for Innovation
• 2018 – influenced national planning policy with inclusion of the term ‘airspace’ in the
National Planning Policy Framework
• 2018 - Apex feature on BBC1 prime time programme on homes and innovation
• 2018 – BGF invests first part of £9.25m into Apex
• 2019 – Homes England invests £9m into Apex
• 2019 – Greater London Authority invests £10m into Apex
• 2019 - Apex featured in international documentary on how world cities are responding to
using space creatively
• 2019 – Apex named ‘Best Newcomer’ in Property Week Resi 2019 Awards
• Shortlisted in Evening Standard Business Awards ( 28th June)
• Shortlisted in Estates Gazette ‘Residential Innovator of The year (Oct 19)
What do we do?
We build on top of existing assets to create new
homes: private sale and affordable
Key benefits
• Produces new value from existing assets
• Create new homes
• Generates balance sheet leverage
• Reduces costs of maintenance
• Innovation
• Reduced service costs
• Ground rent income
• Improvements to the building kerb appeal
Airspace as a solution
• New form of land supply- 180,000 homes -£54bn• Re purposing of assets/ sweating of assets• Reduction of planned maintenance expenditure• Political –– supported by MHCLG and GLA• Opportunity to create funding and new homes• Creation of balance sheet leverage• Innovation – embracing offsite construction
Our Review process
5
✓ Optimal value/return
✓ Good planning chance
✓ Implementable
✓ Good return✓ Some challenges but
do-able
✓ Low value return✓ Range of construction
and legal hurdles✓ Planning difficult
Gold
Silver
Bronze
•What are legal hurdles?
• Can scheme be
developed?
• Legal documentation/
contract
• Rights of leaseholders/
neighbours
• Legal View
• Conduct full scheme
financial appraisal
•What is preferred
construction process?
•What surveys are
required to progress?
• Specific construction
constraints?
• Project Delivery plan
• Views of professional
team
•What are key planning
policy considerations?
•Optimising design value
• Impact of CIL and 106
on costs
• Potential areas of
objections
•What is likely impact on
project delivery time?
Planning
• Massing/ Density
• Parking
• Tenure
• Rights of Light
• Listed buildings
• Skyline
• Whole site or partial ?
Apex influencing direction
• 2016 – DCLG/Major of London joint consultation
• 2017 – Housing White Paper• 2018 - Draft London Housing
Strategy/ London Plan• July 2018 – First mention in NPPF• October 2018 – new consultation on
PD rights for airspace?• 2019 PD rights Autumn
Funding airspace
• New market
• New risks
• New approach/ modular
• New processes – monitoring role
• Apex have £60m capability
Buildings /construction
• Structural integrity
• Typologies
• Access issues and lifts
• Services capacity
• Nature and scope of works
• Type of contract
• Costs
Apex has developed a comprehensive delivery platform with an experienced in-
house team that is complimented with strategic partnerships in the supply chain,
and an extended team of ‘ best in class’property professionals.
Apex’s focus on offsite manufacture reduces reliance on an over stretched
construction labour market whilst enhancing the overall speed of delivery, process and
quality/consistency of airspace development.
Apex believes that scale is critical in creating the most efficient delivery of the product.
Apex has agreed partnerships with three manufacturers who have a combined output
of 100 complete homes a week. End to end design, delivery and installation period
is 24 weeks. This results in a total typical delivery timeline for Apex schemes of 53
weeks from start to finish.
To optimise the delivery chain, Apex has established a robust framework of architects
and consultants who are experienced in offsite manufacturing, design and installation
APEX DELIVERY Timeline
CASE STUDY
ANTONY & RODERICK
• Scheme with Lambeth & Southwark HA
• Pitched Roof would need replacement over next 3 years at cost of £400k
• New scheme will provide a total of 30 additional apartments for affordable
housing - in effect doubling the density
• Two storey extension to the existing blocks, with two book end developments of
six apartments each
• Improvements to the elevations, and amenities of the buildings, including a new
lift for the benefit of all residents
• Scheme will offer balance sheet leverage of some £5m to a small housing
association to fund more new housing supply
• Scheme to be approved
• Scheme is planning policy compliant
CASE STUDY 3 : London
Borough
• New scheme will provide a total of 12 or 24 additional apartments for affordable
housing
• One or two storey extension to the existing blocks,
• association to fund more new housing supply
• Scheme designed by Studio Partington architects
CASE STUDY – South London
• Scheme proposal with G15 player
• New scheme will provide a total of between 24 & 48 additional apartments
for range of affordable housing tenures
• One or two storey extension to the existing blocks,
• Balance sheet leverage of some £6m
• Significant improvements to the existing blocks
CASE STUDY : Housing Association
site London
• We can deliver the units as either 100% affordable, a Capital Receipt or a
mix of both. Apex will finance the whole scheme from feasibility to
completion and take all of the project risks.
• Apex will design the scheme with the agreement of the organisation and
residents, liaising throughout the process and incorporating a ‘Planning for
Real’ approach.
• Use offsite modular constructed units to enhance speed of delivery, and
minimise disruption, whilst delivering a product that will be NHBC (or similar)
warranty backed with high levels of energy efficiency and consistent with
the London Design Guide.
• ‘Open Book’ approach working in true partnership.
• Indicative viability assessment of options c.£200-220k per unit TSC,
however, we would anticipate that costs will reduce once technical due
diligence has been concluded: