Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
I M/s Essar Oil Limited shall comply with new standards
/ norms for Oil Refinery Industry Under the
Environment Protection Rule 1986 vide GSR 186 (E)
dated 18th March 2008.
The design of refinery unit shall incorporate process
features and equipments to comply with the emission
and effluent standards for petroleum refinery.
Nayara Energy Limited (Formerly known as Essar Oil Limited) are in compliance with the
conditions given for Oil & Gas Industries in GSR 186 (E) dated 18th March, 2008. The detailed
compliance report is attached as Annexure 1.1.
The design of refinery units incorporates process features and equipment in such a manner to
comply with all the norms prescribed in GSR 186 (E) dated 18th March 2008.
Following features have been adapted at design stage to reduce air emission:
Low Temperature Shell Claus off Gas Treating Units (LT SCOT) at sulfur recovery unit.
Sulfur Recovery Unit having sulfur recovery efficiency 99.9%.
Multistage multiple Cyclones in Fluidized Catalytic Cracking & Regeneration unit for particulate
emission control.
Amine Absorbers - The fuel gas produced in the refinery contains H2S. This is removed in the
Amine absorber columns and the sweet gas is routed to Refinery fuel gas system.
Use of Low Sulfur Refinery fuel Gas and Fuel Oil in heaters / furnaces. Installed Low NOX burners
in all heaters / furnaces.
Floating roof tanks are provided for storage of class A products; this reduces HC vapor loss.
Double seal has been provided in order to minimize vapor leakage.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
All vent offs are connected to the flare to take care emergency releases from refinery plant.
As shown under Annexure 1.1 all parameters monitored to comply with the emission & effluent
standards for petroleum refinery as per GSR 186 (E) dated 18th March, 2008 are well below the
prescribed limits.
II The gaseous emissions (SO2, NOx, H2S, NH3, NMHC,
HC, VOC and Benzene) from various process units shall
confirm to the standards prescribed by the concerned
State Pollution Control Board.
All the measures detailed in the Environment
Management Plan (EMP) and response to the public
hearing shall be taken to control the point / stack and
fugitive gaseous emission from the proposed facilities
for ensuring that the ambient air quality around the
The gaseous emissions parameters as prescribed by Gujarat Pollution Board in Consolidated
Consent & Authorization (CC & A) from stacks attached to heaters / furnaces and to various
process units are being complied. It may kindly be noted that the CC&A specifies only SO2, NOx,
PM, CO, Ni+V, H2S gases and there is no gaseous emission source for NH3 & NMHC from process
units.
Regarding HC and VOC since refinery is operated in a closed loop hence VOC emission is
minimum. However, VOC are monitored as a part of LDAR programme as per GSR 186 (E) dated
18th March, 2008.
Gaseous emissions monitoring results for Mar’18 to Aug’18 are tabulated in Table no. : 01A, 01
B, 2A & 2B:
All the measures taken as detailed in Environmental Management Plan for mitigation of adverse
impacts on environment due to Refinery operations is as follows:
Air Pollution Prevention / Control Measures:
Air pollution prevention / Control measures adopted at site are as following:
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
refinery due to the expansion is maintained with in
prescribed limit under the EPA, 1986.
Installed Low Temperature Shell Claus off Gas Treating Units (LT SCOT) at sulfur recovery
unit.
Installed Multistage multiple Cyclones in Fluidized Catalytic Cracking & Regeneration
unit for particulate emission control.
Installed Amine Absorbers - The fuel gas produced in the refinery contains H2S. This is
removed in the Amine absorber columns and the sweet gas is routed to Refinery fuel
gas system.
Use of Low Sulfur Fuel - Refinery fuel Gas and Fuel Oil are used as fuel in heaters /
furnaces.
Installed Low NOX burners in all heaters / furnaces.
Installed Sulfur Recovery Unit having sulfur recovery efficiency 99.9%.
Floating roof tanks: Floating roof tanks are provided for storage of class A products; this
reduces HC vapor loss. Double seal has been provided in order to minimize vapor
leakage.
Good Flare Management- all vent offs are connected to the flare to take care emergency
releases from refinery plant.
Leak Detection and Repair Program (LDAR) has been implemented in the refinery.
No issues raised regarding control of the fugitive gaseous emission during the Public hearing.
However, Adequate control measures as mentioned above have been taken to ensure that
ambient air quality around the refinery is maintained within prescribed limit. The summary of
the ambient air quality monitoring for the period March’18 to August’18 are as shown in Table
no. 03A & 03B.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The summary of the stack monitoring for the period March’18 to August’18 are as shown in
Table no. 01 A,01 B 02 A & 02 B., all parameters are well below the limits prescribed by statutory
authority.
Manual monitoring result of stack emission for the month of Mar’18 to Aug’18 carried out by M/s Unistar Environment & Research Labs Pvt. Ltd.
(NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20):
(A) Emission through heater’s/furnace’s stacks (Table no. 01 A):
Sr.
No.
PLANT Parameters monitored
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Ni
(mg/Nm3)
Vanadium
(mg/Nm3)
Min-Max Min-Max Min-Max Min-Max Min-Max Min-Max
1 CDU/VDU 15-46 190-255 92-110 15-28 0.030 0.20
2 CDU - II 52-86 443-739 124-157 17-26 0.040 0.29
3 DHDT 7-14 11-41 56-82 5-13 NA NA
4 VGOHT 7-29 26-49 64-84 7-16 NA NA
GPCB Limit (for Sr. No. 1 to 4
above )
100 1700 450 200 5 5
5 NHT/CCR 5-7 11-29 54-80 6-15 NA NA
6 DHDS 4-8 8-12 58-82 6-10 NA NA
7 FCC Feed heater 5-8 12-22 43-108 5-11 NA NA
8 HMU – 1 4-8 22-41 31-82 6-18 NA NA
9 HMU-2 5-8 8-44 21-74 08-12 NA NA
10 DCU - 1 5-8 17-27 57-86 12-26 NA NA
11 DCU - 2 6-8 12-31 37-48 14-27 NA NA
12 DCU - 3 4-7 6-24 32-52 11-26 NA NA
GPCB Limit (for Sr. No. 5 to 12) 10 50 350 150 - -
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
(B) Emission through processes stacks (Table no. 02 A):
Sr. No. Plant Parameters monitored
Sulfur recovery (%) H2S (mg/Nm3) NOx (mg/Nm3) CO (mg/Nm3)
Min-Max Min-Max Min-Max
1 SRU 99.8 1 18-44 11-22
2 SRU - 1 99.7 1 32-51 10-16
GPCB Limit (for Sr. No. 1 & 2) 98.7 15 350 150
Sr. No. Plant Parameters monitored
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Ni (mg/Nm3) V (mg/Nm3)
Min-Max Min-Max Min-Max Min-Max Min-Max Min-Max
3 FCC
Regenerator
31-62 229-457 72-112 52-273 0.05-0.07 0.21-0.35
GPCB Limit (for Sr. No. 3) 100 1700 450 400 5 5
Legends:
CDU/VDU Crude Distillation Unit / Vacuum Distillation Unit
CDU - II Crude Distillation Unit - II
NHT/CCR Naphtha Hydro Treater/ Continuous Catalytic Reforming
DHDS Diesel Hydro de Sulfurization
FCCU Fluidized Catalytic Cracking Unit
HMU Hydrogen Manufacturing Unit
DHDT Diesel Hydro Treater
VGOHT VGO Hydro Treater
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
DCU Delayed Coker Unit
SRU Sulfur Recovery Unit
PM Particulate Matter
SO2 Sulfur Dioxide
NOx Oxides of Nitrogen
H2S Hydrogen Sulfide
CO Carbon Monoxide
Ni Nickel
V Vanadium
NA: Not Applicable
The Monitoring report by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239,
T-2240 valid till 14.09.20 is attached as Annexure 1.1.1.
Note: The Monitoring is carried out by NABL accredited third party, i.e. Unistar Laboratories Private Limited, Vapi. The NABL accreditation certificate are
shown below:
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Continuous Emission Monitoring system
Apart from this Continuous emission monitoring system is provided & hooked up with CPCB server for all stacks. Stack emission data for the month of
Mar’18 to Aug’18 are shown in table below:
(A) Emission through heater’s/furnace’s stacks (Table no. 01 B) :
Unit SO2 NOx CO PM
mg/Nm³ mg/Nm³ mg/Nm³ mg/Nm³
Min Max Min Max Min Max Min Max
CDU 77.6 539.08 1.07 137.05 1.16 162.41 2.49 69.21
VDU 59.8 551.73 44.26 98.97 14.72 91.36 3.95 29.13
CDU-II 97.9 1134.29 7.4 199.41 26.83 121.34 4.84 84.54
FCCR 312.3 690.2 112.75 306.75 198.58 373.68 22.82 43.26
NHT/CCR 3.2 37.41 49.01 61.07 7.77 21.15 Will be installed by
TA18* DHDS 7.7 45.68 4.36 67.77 7.74 16.9
FCCH 1.5 43.65 45.58 133.13 5.42 14.4
DHDT 36.4 187.8 11.36 193.55 14.05 145.11
VGOHT 1.3 80.58 3.28 177.39 1.04 177.71
HMU-1 1.3 24.55 0.49 37.28 Will be installed by
TA18 HMU-2 1.2 17.97 0.19 19.97
DCU-1 1.7 42.43 15.49 162.19 17.57 145.99
DCU-2 4.4 43.48 15.9 49.43 2.82 146.5
DCU-3 2.0 39.28 1.06 60.8 9.06 110.64
SRU Not in Consent 30.29 79.82 Will be installed by
TA18
Not in Consent
TA18* - Turn around 2018,Planned in November – December 2018
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
(B) Emission through processes stacks (Table no. 02 B):
Sr. No. Plant
NOx (mg/Nm3)
Min-Max
1 SRU 2-80
2 SRU - 1 6-21
GPCB Limit (for Sr. No. 1 & 2) 350
Sr. No. Plant
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Min-Max Min-Max Min-Max Min-Max
3 FCC
Regenerator
24-43 89-690 68-307 199-374
GPCB Limit (for Sr. No. 3) 100 1700 450 400
Legends:
NA: Not applicable
Note : Calibration detail for analyzers from SAP is shown below:
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
For CDU I :
Detailed calibration reports for analyzers are maintained in our SAP server. Screen shot of the same is attached as Annexure 1.1.2.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Calibration Schedule:
Detailed calibration schedule is attached herewith as Annexure 1.1.3.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Ambient Air Quality for Mar’18 to Aug’18 are shown in Table no. 03 A.
Manual Monitoring by Third Party, M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL accreditation no. for Chemical & Biological: TC-7753 in
lieu of T-2239, T-2240 valid till 14.09.20).
Table no. 03 A: Analysis results for Ambient Air Quality
Sr.
No
Particulars/
Parameters Unit
GPCB
CC&A
Limit
At 93 gate Refinery
main gate Labor Gate
PORT A
CAMP
Min Max Min Max Min Max Min Max
1
Wind
Direction
(From)
NW NW NW NW NW NW NW NW
2 PM10 μg/m3 100 61 88 56 78 61 88 54 88
3 PM2.5 μg/m3 60 16 28 16 26 17 28 14 28
4
Sulphur
Dioxide
(SO2)
μg/m3 80 12 28 14 26 12 26 16 27
5
Nitrogen
Oxides
(NO2)
μg/m3 80 16 32 18 29 16 28 19 32
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
6
Carbon
Monoxide
(CO)
mg/m3
4 <1 <1 <1 <1 <1 <1 <1 <1
7 Benzene μg/m3 5 <1 <1 <1 <1 <1 <1 <1 <1
8 Benzo(a) -
Pyrene μg/m3 1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
Online Monitoring for Ambient Air Quality (Table no. 03 B) :
Table no. 03 B: Analysis results for Ambient Air Quality
Sr.
No
Particulars/
Parameters Unit
GPCB CC&A
Limit AAQMS 1 AAQMS 2
Min Max Min Max
1 PM10 μg/m3 100 34 85 29 78
2 PM2.5 μg/m3 60 14 56 5 54
3 Sulphur Dioxide (SO2) μg/m3 80 1 52 1 64
4 Nitrogen Oxides (NO2) μg/m3 80 4 30 20 40
5 Carbon Monoxide
(CO) mg/m3 4 <1 2 <1 1
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
6 Benzene μg/m3 5 <1 <1 <1 <1
7 Benzo(a) - Pyrene μg/m3 1 <0.1 <0.1 <0.1 <0.1
III The company shall confirm to the process vent
standards for organic chemicals including non-VOCs
and all possible VOC i.e. TOCs standards and process
vent standards for top priority chemicals.
Regular monitoring shall be carried out for VOC and
HC and on–line monitors for VOC measurements may
be installed.
We confirm to the process vent standards for organic chemical including non VOCs and all
possible VOC. All process vents are connected to flare. The pilot burners on the flare are
continuously on and therefore there is no chance of unburned HC release to the atmosphere.
Regular monitoring is being carried out for VOC as under:
Manual monitoring for VOC are regularly carried out as per GSR 186 (E) dated 18th March, 2008
The company has well established procedure for leak detection and repair under which VOCs are
monitored in all the units manually though photo-ionization VOC meters since 2010. No leak has
been detected till date. The procedure in brief for LDAR (Leak Detection and Repair) is shown
below. (For detailed procedure please refer Annexure 1.2).
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Procedure for VOC monitoring :
- The VOC Meter should be assembled and started in open & clean atmosphere.
- The instrument should be calibrated as per recommendation of instrument supplier.
- Concentration of VOCs emitted by the leaking component should be checked at the
surface interface (e.g. at the interface between a valve stem and packing).
- The probe inlet should be placed at the surface of the component interface where there
is possibility of Leak. It should be moved along the periphery while observing the
instrument readings.
- The interface where leakage is indicated should be sampled slowly until the maximum
reading is obtained. If the maximum reading exceeds the defined concentration limit
then record the reading. Set the meter to zero reading and again take the maximum
reading for cross verification.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Apart from above, VOC emissions are manually monitored in the vicinity of potential sources of
VOC emissions. VOC emission monitoring results for the month of Mar’18 to Aug’18 are tabulated
in Table no. 04.
Table no. 04: VOC monitoring results
Sr.
No. VOC monitoring area / unit / plant Unit
VOC
Min-Max
1 Near Truck Gantry No. 5 (HC Truck Loading) Ppm 40-60
2 Primary Treatment Plant of Truck Dispatch Area ppm 38-104
3 Expansion ETP ppm 191-243
4 Hazardous waste storage sites ppm 0
5 Primary Treatment Unit of ISBL-1 process ppm 132-194
6 At Battery Limit in CDU/VDU ppm 2-5
7 At Battery Limit in CDU - II ppm 1-5
8 Downwind of equalization tank (Oil Separation
Basin Unit-8400) of base ETP ppm 263-292
9 Primary Treatment Plant of Crude Tank Storage
(COT) Area ppm 9.1-10.8
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The detection limit of the instrument used for measurement of VOC is 0 to 10,000 PPM.
Instrument are regularly calibrated. Calibration report is shown below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
IV The total SO2 emission load for 32 MMTPA refinery
capacity and petrochemical complex will be below
24.60 tons/ day and for III phase for 60 MMTPA
production petrochemicals shall not exceed 38.69
tons /day.
Regular record on sulfur emission shall be maintained
as part of the environmental data record.
SRU of 99% sulfur removal will be established and
efficiency will be monitored at regular intervals.
Presently, refinery is operating at 20 MMTPA capacity. Minimum SO2 emission load is 15.04
MT/day. Maximum SO2 emission load is 15.23 MT/day, which is within limit.
Regular record on sulfur emission are being maintained as a part of environmental data record.
Details are as shown below:
Table no.: 05 Sulfur emission records
Sulfur emission records based on the monitoring carried out
by NABL accredited laboratory are maintained as given
below.SO2 emission from Stacks, Tons/Day
Mar'18 Apr'18 May'18 Jun'18 Jul'18 Aug'18
15.05 15.03 15.04 15.06 15.23 15.18
SRU of 99% sulfur removal efficiency have been established and efficiency is being monitored at
regular interval as under:
Sulfur removal efficiency for SRUs are shown in table no 06 A, 06 B, 07 A & 07 B
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
For SRU Base (Table 06 A)
CA
SE
AA
G T
rain
I
Flo
w,
kg/h
r
AA
G T
rain
II
Flo
w,
kg/h
r
CR
U g
as
Flo
w,
kg/h
r H2S in Feed
Gas, wt %
H2S in Feed
Gas, kg/hr
S in Feed Gas,
kg/hr
Poten
tial
Sulph
ur,
TPD
Amine CRU Amine CRU Amine CRU
Actual 7342 6344 1464 94.38 93.25 12917 1365 12157 1285 322.6
For SRU Base (Table no. 06 B)
St
ack
Ga
s
Sox
wt%
H2
S w
t%
SOx in
Stack
gas,
kg/hr
H2S in
Stack
gas,
kg/hr
S in
Sox,
kg/hr
S in
H2S,
kg/hr
S in
Stack
Gas,
kg/hr
Total S
in Stack
gas, t/d
Potenti
al
Sulphur
, TPD
Sulph
ur
Recov
ery
Act
ua
l
73
41
7
0.0
41
1
0.0
01
30.20 0.73 15.10 0.69 15.79 0.3790 322.6 99.9%
For SRU Expansion (Table 07 A)
CA SE
Am
ine
Aci
SW S Aci H2S in Feed
Gas, wt %
H2S in Feed
Gas, kg/hr
S in Feed Gas,
kg/hr
Potentia
l
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Amine CRU Amine CRU Amine CRU
Sulphur,
TPD
Actual 26651 3867 94.99 47.0 25315 1818 23826 1711 612.9
For SRU Expansion (Table no. 07 B)
St
ack
Ga
s
Sox
wt%
H2
S w
t%
SOx in
Stack
gas,
kg/hr
H2S in
Stack
gas,
kg/hr
S in
Sox,
kg/hr
S in
H2S,
kg/hr
S in
Stack
Gas,
kg/hr
Total S
in Stack
gas, t/d
Potenti
al
Sulphur
, TPD
Sulph
ur
Recov
ery
Act
ua
l
10
53
07
0.0
34
4
0.0
01
36.20 1.05 18.10 0.99 19.09 0.4582 612.9 99.9%
Refinery has two units of SRU. One, base SRU which has been upgraded to 99.9% design
efficiency from 99.4 % by replacing Super Clause Process by LT-SCOT Process. Second, SRU
expansion which was installed during expansion of the base refinery; it is also based on LT- SCOT
Process designed to operate at 99.9% efficiency.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Performance evaluation will be done for all these
activities on annual basis to check adequacies and
improve on the deficiencies.
Performance evaluations of SRUs are done annually.
Presently, both SRUs are operating more than 99.7% sulfur recovery efficiency.
Following measures are adapted for maintaining the performance:
1. Process analyzer are monitored on daily basis for smooth running of plant.
2. And when there is any deviation in reading from the design limit then immediately
analyzer is attended.
3. Stack Analyzer is being attended every 3 month.
V On-line monitoring shall be carried out for stack
emission of SO2 & NOx contributed mainly from CDU,
VDU, SRU, etc and data shall be transferred to CPCB
and SPCB regularly.
Online monitoring is being carried out for stack emission of SO2 & NOx in all stacks including CDU,
VDU and SRU. Online data are being transmitted to CPCB server since June’ 2015. Earlier we have
contacted GPCB to upload the data on their server, but at that time GPCB server did not have
enough capacity. We have again approached GPCB office to suggest a way forward. Request
letter to GPCB for the same is as given below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The instruments used for ambient air quality
monitoring shall be calibrated regularly.
The monitoring protocol shall ensure continuous
monitoring of all the parameters.
The Instruments used for ambient air quality are periodically calibrated by M/s Chemtrol. The
calibration report is as given below.
Two stations of Continuous Ambient Air Quality monitoring have been installed in upwind and
downwind direction and on line data are being transmitted to CPCB server since March’2013.
One of our Environment Engineer is assigned to check continuous operation of online analysers,
in case of any abnormality the concerned department is immediately informed and prompt action
is being taken to rectify the problem.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Calibration report:
For AAQMS I : For AAQMS II :
VI The existing plant is using low NOx burners and the
same or the one which are more efficient than the
existing shall be used for the expansion of the projects
too in all furnaces/ heaters.
For the expansion of the project to 20 MMTPA low NOx burner has been provided in the existing
DCU heaters, DHDT, VGOMHC, which are similar to the burners installed in the preexisting unit
i.e. CDU, VDU, NHTCCR, FCCH,DHDS.
We confirm to use the same or the one which are more efficient than the existing, for the
expansion of the projects in all furnaces/ heaters.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
VII The company shall install Hydro desulphurization and
sulfur recovery unit with efficiency more than 99%
Hydro desulphurization & sulfur recovery unit with efficiency 99.9 %. were installed and
commissioned in November, 2006.
VIII For additional LPG storages, refrigerated storage or
mounded bullets shall be installed.
No additional LPG storages has been created after issuance of this EC & we confirm that For
additional LPG storages required in future , refrigerated storage or mounded bullets will be
installed.
IX Low sulfur internal fuel oil and fuel gas shall be fired in
process heaters.
Low sulfur Internal fuel gas is being fired in all the process heaters except CDU, VDU, CDU-II,
VGOHT and DHDT wherein mixture of low sulfur fuel oil and fuel gas is being fired.
Quality of fuel oil & fuel gas for the month of Mar’18 to Aug’18 is shown in table no. 08 A & 08
B.
Table no. 08 A Table no. 08 B
Sulphur Concentration in Wt% in Fuel Oil
Sr. No.
Month Monthly Average
1 Mar 0.74 2 Apr 0.84 3 May 0.77 4 Jun 0.59 5 Jul 0.44 6 Aug 0.57
H2S Concentration in mg/Nm3 in
Fuel Gas
Sr.
No. Month Monthly Average
1 Mar 32.5
2 Apr 21.9
3 May 14.3
4 Jun 11.8
5 Jul 16.8
6 Aug 19.4
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
X
Quarterly monitoring of fugitive emissions will be
carried out by Fugitive Emission Detectors (GMI Leak
Surveyor).
Guidelines of CPCB shall be followed for monitoring
fugitive emissions.
Quarterly Monitoring of fugitive emissions is being carried out as per GSR (186) E, 2008. (Detailed
compliance is covered under Annexure 1.1 GSR condition no.ii)
Guidelines of GSR (186) E, 2008 are being followed for monitoring fugitive emissions.
XI Floating roof double seal tanks will be provided to
reduce the VOC fugitives’ emission.
For management of fugitive emissions, all unsaturated
hydrocarbons will be routed to the flare systems. The
flare system shall be designed for smoke less burning.
Floating roof double seal tanks have been provided to reduce the VOC fugitives’ emission for all
Class-A & B Hydrocarbons (HC).
For management of fugitive emissions, all unsaturated hydrocarbons are being routed to the flare
system which is designed for smokeless burning with steam.
XII Flare Gas Recovery (FGR) system shall be installed for
reduction of hydrocarbon loss and emission of VOCs,
NOx, N2O, and SOx & CO2 to the environment.
At present flare losses are minimal therefore it is flared directly. However, we have already made
provision for installing Flare Gas Recovery System for reduction of hydrocarbon loss and emission
of VOCs, NOx, N2O and SOx & CO2 to the environment.
XIII FCC shall be provided with an ESP and other sources
of particulate will be controlled to meet E (P) Act
standards.
FCC has been provided with high efficiency cyclones so as to ensure that the particulate emissions
are within the limit. We are meeting the E (P) Act standards by installing cyclones. This is a general
practice to provide cyclones in FCC.
Monitoring report for the stack emission parameter for the period of Mar’18 to Aug’18 is as given
in Table no. 09 A & 09 B.
Monitoring results for FCC regenerator for the month of Mar’18 to Aug’18 carried out by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL
accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20) :
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 09 A
Sr. No. Plant Parameters monitored
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Ni (mg/Nm3) V (mg/Nm3)
Min-Max Min-Max Min-Max Min-Max Min-Max Min-Max
1 FCC
Regenerator
31-62 229-457 72-112 52-273 0.05-0.07 0.21-0.35
GPCB Limit (for Sr. No. 3) 100 1700 450 400 5 5
Continuous Emission Monitoring System
Table no. 09 B
Sr. No. Plant
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Min-Max Min-Max Min-Max Min-Max
1 FCC
Regenerator
22-43 313-690 113-307 199-374
GPCB Limit (for Sr. No. 3) 100 1700 450 400
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XIV Regular Ambient Air Quality Monitoring shall be
carried out.
The location and results of existing monitoring
stations will be reviewed in consultation with the
concerned State Pollution control Board based on the
occurrence of maximum ground level concentration
and downwind direction of wind.
Regular Ambient Air Quality Monitoring is being carried out at 4 nos. of Ambient air quality
sampling stations installed within the Refinery premises one in in up wind & one in down wind
direction and 2 nos in cross wind direction.
Ambient Air Quality Monitoring is being carried out once a week at 4 locations. Reports are
regularly submitted to GPCB.
Monitoring results for the month of Mar’18 to Aug’18 carried out by M/s Unistar Environment
& Research Labs Pvt. Ltd. (NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of
T-2239, T-2240 valid till 14.09.20) are as given in Table no. 10.
Table no. 10
Sr.
No
Particulars/
Parameters Unit
GPCB
CC&A
Limit
At 93 gate Refinery
main gate Labor Gate
PORT A
CAMP
Min Max Min Max Min Max Min Max
1
Wind
Direction
(From)
NW NW NW NW NW NW NW NW
2 PM10 μg/m3 100 61 88 56 78 61 88 54 88
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Additional stations shall be set up, if required, It will
be ensured that at least one monitoring station is set
up in up wind & in down wind direction along with
those in other direction.
3 PM2.5 μg/m3 60 16 28 16 26 17 28 14 28
4
Sulphur
Dioxide
(SO2)
μg/m3 80 12 28 14 26 12 26 16 27
5
Nitrogen
Oxides
(NO2)
μg/m3 80 16 32 18 29 16 28 19 32
6
Carbon
Monoxide
(CO)
mg/m3
4 <1 <1 <1 <1 <1 <1 <1 <1
7 Benzene μg/m3 5 <1 <1 <1 <1 <1 <1 <1 <1
8 Benzo(a) -
Pyrene μg/m3 1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
Apart from above sampling stations, 2 nos. of Continuous AAQM (One in upwind & one in
downwind) installed within the Refinery premises. Real time data of CAAQMS are transmitted to
CPCB through M/s Chemtrol server since March 2013.
Monitoring result of CAAQMS for the month of Mar’18 to Aug’18 are as given in Table no. 11
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 11: Monitoring result of CAAQMS
Sr.
No
Particulars/
Parameters Unit
GPCB CC&A
Limit AAQMS 1 AAQMS 2
Min Max Min Max
1 PM10 μg/m3 100 34 85 29 78
2 PM2.5 μg/m3 60 14 56 5 54
3 Sulphur Dioxide (SO2) μg/m3 80 1 52 1 64
4 Nitrogen Oxides (NO2) μg/m3 80 4 30 20 40
5 Carbon Monoxide
(CO) mg/m3 4 <1 2 <1 1
6 Benzene μg/m3 5 <1 <1 <1 <1
7 Benzo(a) - Pyrene μg/m3 1 <0.1 <0.1 <0.1 <0.1
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XV The practice of acoustic plant design shall be adopted
to limit noise exposure for personnel to an 8 hr time
weighted average of 90 dB (A).
The practice of acoustic plant design is being adapted., in refinery to limit noise exposure for
personnel to an 8 hr time weighted average of 90 db (A), All the equipment have been designed
and are operated with noise level of <90 dB (A).
The design of project is such that the sound level in the work area is not exceeding 90 dB (A).
Wherever practicable, attempts have been made to reduce the noise level below 90dB (A).
However the areas where it is not reasonably practicable to reduce the noise level below the
limit have been designated high noise area, where the movement is restricted and limited
exposure is allowed to the working personnel.
Following measures have been adapted to reduce the noise exposure:
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The major areas of concern for noise generation has been addressed by considering it
during procurement of the machinery from vendors, project implementation stage and
by giving correct specification during tender floating.
Periodic audiometric test is being conducted for employees working close to noise prone
areas, such as compressors, DG Sets, the loading and unloading sections.
PPE’s are provided to ensure for eardrum protection of the employees, workers as well
as visitors.
Acoustic barriers or acoustic enclosures and silencers are provided for the high noise
generating equipment.
Sound proofing / glass paneling have been provided at critical operating stations / control
rooms.
Further Periodical Monitoring of the exposure to the person working in high noise is being done.
Results of noise exposure for personnel to an 8 hr time weighted average is as shown in Table
no. 12.
The below result indicates that the personal working in the high noise area are not continuously
exposed to high noise.
Table no. 12 Results of Personal Noise dosimetry at Nayara Energy Limited, Vadinar, India.
Date of Project: 29-01-2018 to 7-02-2018
Calibrator: QUEST QC-10, Acoustic Calibrator, Serial No.: QIH010149 Date of Samplin
g
Instrument ID
Employee Name
Employee ID
Location/
Depa
Activity
Pre-calibratio
Post-calibratio
Shift
Duration of Sampling
Total Duratio
n
Total Durat
The Factories Act
(5 dB Comments
Observations
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
rtment
n (dB)
n (dB)
ion (min)
Exchange Rate)
& Recommendations
Start
Time
Stop Tim
e
Lavg (dBA)
TWA (dBA
)
To view additional details, please unhide the columns. Personal Noise sample at HMU-2
29/1/2018
EHM010022
Mr. Hardik Pobhoraniya
20045659
HMU-2
Routine operation in the
plant
114.0 114.0 B 14:1
3 21:4
2 7:29 449 76.6 76.1
The monitored employee took routine rounds in the plant for 2 hours and spent rest of the time in the porta cabin. None
30/1/2018
EHH050012
Mr. Rahul Paliwal
20044255
HMU-2
Routine operation in the
plant
114.1 114.0 B 15:0
2 22:2
7 7:25 445 74.8 74.2
The monitored employee spent 2 hours at the pump house area and rest of the time at the porta cabin.
Personal Noise sample at HMU-1
31/1/2018
ENS100709
Mr. Satish Yadav
20050197
HMU-1
Routine operation in the
plant
114.0 114.0 A 6:11 14:1
5 8:04 484 76.3 76.3 The monitored
employee spent three to four hours at the pump house area and rest of the time at the porta cabin.
None
1/2/2018 EHH05001
2
Mr. Tarun Dhameliya
2004232 HMU
-1
Routine operation in the
plant
114.0 113.9 A 6:22 13:5
6 7:34 454 82.7 82.4
Personal Noise sample at DHDT
29/1/2018
EHH050012
Mr. Arvind Kumar
20053295
DHDT
Routine operation in
114.0 114.1 B 14:5
5 22:5
6 8:01 481 77.7 77.8
The monitored employee spent four hours on routine rounds in the plant and spent
None
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
the plant
rest of the time in the porta cabin.
30/1/2018
EHH050012
Mr. Mustaq Vohra
20045664
DHDT
Routine operation in the
plant
114.0 114.0 A 6:15 13:4
0 7:25 445 77.9 77.1
The monitored employee spent four hours on routine rounds in the plant and spent rest of the time in the porta cabin.
Personal Noise sample at DHDS
30/1/2018
EHH050012
Mr. Parth Desai
20045662
DHDS
Routine operation in the
plant
114.0 113.8 B 14:1
0 21:5
0 7:40 460 79.5 79.2
The monitored employee spent four hours on routine rounds in the plant and spent rest of the time in the porta cabin.
31/1/2018
NXG080022
Mr. Sanjay Chawhan
20045052
DHDS
Routine operation in the
plant
114.0 113.9 A 6:40 14:1
0 7:30 450 80.6 79.9
The monitored employee spent four to five hours on routine rounds in the plant and spent rest of the time in the porta cabin.
Personal Noise sample at CDU/VDU
29/1/2018
NXG080033
Mr. Dipak Kumar Mantri
20049375
CDU/VDU
Routine operation in the
plant
114.0 113.9 B 15:4
0 21:5
0 6:10 370 79.1 77.3
The monitored employee took routine rounds in the plant for three hours. The rest of the time was spent at the porta cabin.
None
30/1/2018
ENS100709
Mr. Savan Vachhani
20053199
CDU/VDU
Routine operation in the
plant
114.0 113.7 B 14:5
5 21:4
4 6:49 409 83.8 83.1
The monitored employee was at the compressor area for three hours and took routine rounds in the plant for one hour. The
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
rest of the time was spent at the porta cabin.
31/1/2018
NXG080033
Mr. Viral Shah
20046190
CDU/VDU
Routine operation in the
plant
114.1 114.0 A 6:47 13:5
6 7:09 429 81.5 81.0
The monitored employee took routine rounds in the plant for two-three hour. The rest of the time was spent at the porta cabin.
XVI All the pumps and other equipment’s where is a
likelihood of HC leakages shall be provided with LEL
indicators and Hydrocarbon detectors.
Provision for immediate isolation of such equipment,
in case of a leakage will also be made.
All the pumps and other equipment where there is a likelihood of HC leakages are being provided
with hydrocarbon detectors with LEL indicators. Around 619 nos. of Hydrocarbon detectors have
been installed in all areas where there is a likelihood of HC leakages from pumps and other
equipment.
The range of detector is 0-100% LEL of the Hydrocarbon of respective area and Alarm value is L1:
20% LEL and L2: 40% LEL.
Standby pumps have been provided so that leaky pumps are immediately isolated and
maintained.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The company shall provide a well-defined Leak
Detection and Repair (LDAR) programme for
quantification and control of fugitive emissions. The
detector sensitivity will be in PPM levels.
The company has well established procedure for leak detection and repair as per GSR 186 (E)
dated 18th March, 2008 under which VOCs are monitored in all the units manually though photo-
ionization VOC meters since 2010. NO leak has been detected till date.
The detection limit of the instrument used for measurement of VOC is 0 to 10,000 PPM.
LDAR program summary for the month of Mar’18 to Aug’18 is shown in Table no. 13.
Table no. 13. LDAR PROGRAM SUMMARY- March’2018 to August’2018
Sr.
No Unit Dates
Total Component
Monitored
Min VOC
in PPM
Max VOC
in PPM
Leak
Observed
1 HMU-1 01/03/2018 to
14/03/2018 4238 0 224 Nil
2 HMU-2 15/03/2018 to
30/03/2018 2920 0 0 Nil
3 FCCU 01/04/2018 to
14/04/2018 7481 0 23 Nil
4 Utility-1 15/04/2018 to
29/04/2018 1027 0 61 Nil
5 Utility-2 01/05/2018 to
30/05/2018 491 0 285 Nil
6 DCU 01/06/2018 to
29/06/2018 9601 0.1 5 Nil
7 DHDS 01/07/2018 to
14/07/2018 3022 0 500 Nil
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
8 NHT/ CCR 15/07/2018 to
30/07/2018 5995 0 800 Nil
9 COT 15/08/2018 to
30/08/2018 281 0.1 16.2 Nil
Total 35055 components were monitored from Mar’18 to Aug’18.
XVII The product loading gantry shall be connected to the
product sphere in closed circuit through the vapor arm
connected to the tanker.
Data on fugitive emission from here shall be regularly
monitored and records will be maintained.
The LPG Loading gantry has been connected to the product sphere in closed circuit through the
vapor arm connected to the tanker.
Data on fugitive emission from product gantry & nearby area are tabulated in table no. 14.
Table no. 14
Sr.
No. VOC monitoring area / unit / plant Unit
VOC
Min-Max
1 Near Truck Gantry No. 5 (HC Truck Loading) ppm 0
2 Primary Treatment Plant of Truck Dispatch Area ppm 38-104
3 Expansion ETP ppm 191-243
4 Hazardous waste storage sites ppm 0
5 Primary Treatment Unit of ISBL-1 process ppm 132-194
6 At Battery Limit in CDU/VDU ppm 0
7 At Battery Limit in CDU – II ppm 0
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
8 Downwind of equalization tank (Oil Separation
Basin Unit-8400) of base ETP ppm 263-292
9 Primary Treatment Plant of Crude Tank Storage
(COT) Area ppm 9.1-10.8
XVIII The company shall ensure that no halogenated
organic is sent to the flares.
If any of the halogenated organic are present, then the
respective streams may be incinerated, if there are no
technically feasible or economically viable
reduction/recovery options.
Any stream containing organic carbon, other than
halogenated shall be connected to proper flaring
system, if not to a recovery device or an incinerator.
There is no halogenated organic presently handled at the Refinery.
In case same is required to be handled it will be ensured that no halogenated organic is sent to
the flares and suggested treatment will be implemented.
All other streams containing organic carbon stream are routed to flare system.
XIX Water requirement of the refinery and petrochemical
complex shall be met from sea water desalination and
no water shall be drawn either from the ground or
from the surface.
Water requirement of refinery is being met through existing sea water desalination plant and no
water is being drawn either from ground or from the surface.
Necessary approval like FCA (permission obtained vide letter no.8C/12/385/96-FCW dated 8th
December, 99), CRZ (permission obtained vide letter no.16011/22/2000-IA-III dated 3th
November, 2000) & WLPA (permission obtained vide letter no. FCA/WLP/29/1043-48/2003-04
dated 27th February, 2004) clearance was obtained for sea water intake and associated facilities.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XX No discharge of wastewater from sweet water ETP
shall be carried out. The quantity of wastewater
generation is 3726 m3/hr from the project.
This effluent after appropriate treatment will be
reused in process/ utilities or cooling or for green belt
development.
Wastewater from ETP is being reused in Fire Water, Service Water & Cooling Towers make up
and horticulture
The quantity of wastewater from ETP for the month of March’18 to August’18 is as shown in
Table no. 15:
Table no. 15 : Wastewater from ETP
Sr. No. Mar’18 Apr’18 May’18 June’18 July’18 Aug’18
01
Trade
effluent,
M3/hr*
698 596 588 631 627 621
*Note: The quantity shown for wastewater from ETP is for 20 MMTPA refinery.
The influent is being routed to Effluent Treatment Plant (ETP) for required treatment and the
entire Treated Effluent is then reused as Fire Water, Service Water & Cooling Towers and
horticulture and as RO feed. Permeate of Reverse osmosis plant is used as boiler feed water after
DM treatment.
Details of Effluent Treatment Plant(ETP):
All AOC (Accidental Oil Contamination) and COC (Continuous Oil Contamination) water from
plant sent to Primary Treatment unit (PTU) for removal of free oil and dirt by gravity separation
through Tilted Plate Interceptor and oil skimmer. In refinery five PTU is provided at different
location.(Process, PIT, RLCB,TLCB, COT). All the primary treated water are collected & equalized
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
in the oil separation basin. After that Physico chemical Treatment given which comprises of four
units like pH Adjustment Tank, Flash Mixer, Flocculator, and Dissolved Air Floatation Tank.
A two stage biological treatment is provided for biodegradation of organic matter for reduction
of BOD/COD. It comprises of Bio tower followed by extended aeration type activated sludge
process.
The treated effluent is then pumped to Dual Media Filter followed by Activated Carbon Filter
(ACF) for tertiary treatment.
Quality of treated waste water for the month of Mar’18 to Aug’18 is given in Table no 16 carried
out by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL accreditation no. for Chemical
& Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20):
Table no. 16: Quality of treated waste water for the month of Mar’18 to Aug’18
Pollutant Parameters Limiting value for concentration
(mg/l except for pH)
Quality of Treated Effluent
Min-Max
pH 6.0-8.5 7.35-7.51
Oil & Grease 5.0 <4
BOD (3 days, 27 ºC) 15.0 9.0 - 13.0
COD 125.0 29.40 - 45.700
Suspended Solids 20.0 10.0 - 16.0
Phenol (as C6H5OH) 0.35 <0.1
Sulphide (as S) 0.50 0.25 - 0.470
Cyanide (as CN) 0.2 <0.05
Ammonia as N 15 <5
TKN 40 <5
P 3 0.22 - 0.560
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Cr (Hexavalent) 0.1 <0.1
Cr (Total) 2 <0.001
Pb 0.1 <0.003
Hg 0.01 <0.002
Zn 5 0.04-0.067
Ni 1 0.08-0.123
Cu 1 0.04-0.085
V 0.2 <0.01
Benzene 0.1 <0.001
Benzo(a)- Pyrene 0.2 <0.001
ETP block diagram is shown below :
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Only brine from desalination plant and cooling tower
blow down will be discharged to sea through a well
designed diffuser at a location identified by National
Institute of Oceanography (NIO). The quantity of sea
water return is 26932 m3/hr.
Brine from desalination plants and cooling tower blow down is being discharged to sea through
well designed diffuser at a location identified by National Institute of Oceanography.
The quantity of sea water return to sea is monitored daily and is well below the stipulated limits
as shown in Table no. 17.
Table no. 17: Sea Water return quantity:
Mar’18 Apr’18 May’18 June’18 July’18 Aug’18
Sea water
return,
M3/hr
(Min-
Max)*
3456 - 4133 3531 - 4079 3663-4269 2783-4502 2896 -3516 2906-3618
*Note: The quantity shown for sea water return is for 20 MMTPA refinery.
XXI Regular monitoring of relevant parameters for the
underground water in the surrounding areas will be
undertaken and the results will be submitted to the
relevant States pollution Control Boards.
Monitoring of relevant parameters for the underground water in the surrounding areas is being
carried out six-monthly, recent was monitored in Aug’18, results given in Table no. 18.
Report submitted to State pollution Control Board six monthly along with EC compliance report.
Acknowledgement copy for letter submitted to GPCB, Gandhinagar is shown below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 18 Groundwater monitoring in surrounding villages
Parameters Unit Vadinar Timbdi Bharana Mithoi Kathi
Devaliya
Zakhar Singach Kajurada Sodha
Taragadi
pH --- 6.86 7.85 8.15 7.56 7.95 7.36 7.78 8.06 7.75
TDS mg/l 1840 1590 378 1720 1634 1650 1450 730 1040
Chloride mg/l 859 670 220 658 805 305 770 240 410
Sulphate mg/l 338 81 15 97 80 270 94 21 49
T-Hardness mg/l 515 130 200 540 310 505 450 490 385
O & G mg/l <4 <4 <4 <4 <4 <4 <4 <4 <4
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XXII All organic waste shall be sent to incinerator only. For
potential of heat recovery, the possibility of installing
incinerator at site shall be explored and plan may be
submitted to the SPCB.
Alternatively, it will be sent for use as fuel in the
cement Kiln.
All organic waste, i.e. Oily Sludge with high CV is being co-processed in DCU in refinery.
Data of oily sludge co-processed in DCU for the month of Mar’18 to Aug’18 is shown in Table
no.19:
Table no. 19
Refinery is also a member of GPCB approved TSDF facility of M/s SEPPL located at Gandhidham
& M/s Recycling Solution Pvt Ltd (RSPL), Panoli. Membership certificate is shown below, which
can be utilized if need be.
Sr.
No.
Organic
Waste Mar Apr May June July Aug
01
Oily
Sludge
(Dry
Basis
30%
moisture
)
Gen.(MT) 196 0 347 1686 1977 143
Co-
processed
(MT)
177 34 342 1580 1672 379
02
Oily
Sludge &
BSW
Gen.(MT) 400 0 0 0 0 250
Incinerati
on(MT) 12 190 74 62 0 11
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XXIII Solid waste generated as Pre-treater and Reformer
Catalysts, Sulphur guard absorbent and Alumina Balls
will be disposed off as the authorization from the State
Pollution Control Board.
The company has obtained authorization from GPCB vide order no.: AWH-81987 issued in 2016
and valid till 2022 for collection, treatment, storage and disposal of hazardous waste, and
conditions there under are being complied with.
Type of hazardous waste, their mode of disposal and permitted quantity mentioned in CC&A is
as given below in Table no. 20.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 20: Type of hazardous waste, their mode of disposal and permitted quantity
Sr.
No.
Description
of Wastes
Schedule
- I
Quantity
per Year
Mode of Handling & Disposal
1 Oily Sludge
from ETP
35.3 13000
MT
Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users / Co-processing in Delayed Coker Unit
(DCU)
2 Slop Oil 4.3 120000
MT
Collection, Storage and Recycle within the
Plant
3 Oily rags/ Oil
contaminate
d waste
5.2 5000 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users /
4 Used
Lubricating
Oil
5.1 300 MT Collection, storage, transportation and
siposal by selling it to registered re-refiner
units
5 Oily Sludge &
BSW
4.1 5000 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users / Co-processing in Delayed Coker Unit
(DCU)
6 Spent
Catalyst from
Various Units
4.2 8000 MT Collection, Storage, Transportation &
Disposal through actual users / TSDF/
Incineration
7 Contaminate
d cotton rags
or other
33.2 155 MT Collection, Storage, Transportation &
Disposal through actual users / TSDF/
Incineration
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
cleaning
materails
8 Discarded
Empty
Drums/
Containers
33.1 50000
Nos
Collection, Storage, Transportation &
Disposal through actual users
9 Spent Resin
Waste
35.2 15 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users
10 Insulated
copper wire
scrap/ copper
with PVC
sheathing
cable
IV/7 200 MT Collection, storage and disposal by selling it
to registered recycler, reprocessors/ actual
user
11 Lead Acid
Battery
Waste
- 10 MT Collection, Storage, Transportation &
Disposal through actual users
12 Expired
Hazardous
Chemicals
II/ E3 100 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users
13 Spent Carbon 36.2 200 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users/ incineration in power plant boilers
14 e- waste - 20 MT Collection, storage and disposal by through
actual user/ registered recycler
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
15 Waste Coke II- Class A-
70
100 MT Collection, storage and disposal by through
actual user
16 Spent
Catalysts and
Molecular
Sieves
1.6 100 MT Collection, Storage, Transportation and
disposal through TSDF/ Incineration / actual
users
The details of HW generated and disposed in Financial Year 2017-18 is shown in Table no. 21 A
& 21 B
The details of HW generated and disposed for the month of March’18 to August’18 is shown in
Table no. 21 C
Table no. 21 A Details of HW generated during the FY 2017-18.
Sr.
No.
Type of waste Schedule
Unit
Quantity
Generated
in FY 17-18
Method of Storage Mode of Disposal
1. Oily Sludge from
ETP (Semi- Solid) 35.3/I MT 3584
Oily sludge is stored in Reinforced Cement concrete
(RCC) pits lined with 1.5 mm thick HDPE liner &
connected to leachate collection sump which is
finally connected to ETP where leachate is treated.
Reprocessing at Delayed Coker Unit
of Refinery (In-house)/ Co-
processing in Cement Plant (M/s
Ultratech Cement, Kovaya)
2
Used Lubricating Oil
(Liquid)
5.1/I MT 51
The waste is packed in closed 200 Kg. MS drums and
storage facility having HDPE liner, Reinforced
Cement concrete (RCC) floor, covered at the top &
Leachate collection and treatment facility.
Sold to GPCB authorized Re-refiner
M/s Reliance Barrels Supply Co,
Ahmedabad
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
3 Oily sludge & BSW /
emulsion 4.1/I MT 400
The waste is packed in MS drums of 200 Kg and
storage facility having HDPE liner, Reinforced
Cement concrete (RCC) floor, covered at the top &
Leachate collection and treatment facility.
Sent to Pollution Control Board
authorized TSDF / Incineration
facility M/s Saurashtra Enviro
Projects Pvt. Ltd. (Bhachau)
4
Discarded Empty
Drums / Containers
(Solid)
33.1/I Nos. 14295
Stored in the storage facility having Reinforced
Cement concrete (RCC) floor and covered at the top.
Sold to GPCB authorized
Decontamination and
Reconditioning Facility M/s Reliance
Barrels Supply Co., Ahmedabad
5 Slop Oil (Liquid) 4.3/I MT 27272 Slop oil generated is collected in slop oil Tanks
having combined capacity of 6500 m3.
In-house recycling / reprocessing in
mfg. process.
6 Spent Resins waste 35.2/I MT 12.58
Packed in 200 lit MS Drums, closed from top with lid
& ring and then stored in the storage facility having
Reinforced Cement concrete (RCC) floor and
covered at the top.
Sent to Pollution Control Board
authorized recycling facility M/s
Recycling Solutions Pvt. Ltd
7 Heater Deposits II-Class, A70 MT 14.57
Stored in 1 MT jumbo bags at storage facility having
Reinforced Cement concrete (RCC) floor and
covered at the top.
Sent to Pollution Control Board
authorized recycling facility M/s
Recycling Solutions Pvt. Ltd
8
Spent Catalyst From
Various Units
(Solid)
4.2/I MT 180.23
Packed in 200 lit MS Drums, closed from top with lid
& ring and then stored in the storage facility having
Reinforced Cement concrete (RCC) floor and
covered at the top.
Sold to Pollution Control Board
authorized & registered recyclers
M/S Bravo Agrotech, M/s
Vyankatesh Metals and Alloys, M/s
Refracast Metallurgical Pvt. Ltd. and
M/s Rubamin Ltd.
9
Electronic and
Electric Waste
(Solid)
B-1110
GC010.18 MT 11.4
Stored in the storage facility having Reinforced
Cement concrete (RCC) floor and covered at the top.
Sold to Pollution Control Board
authorized recycler M/s Eco Green
Recycling, Valsad
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
10 Lead Acid Battery
Waste (Solid) 17/IV MT 10.15
Stored in the storage facility having HDPE liner,
Reinforced Cement concrete (RCC) floor, covered at
the top & Leachate collection and treatment facility.
Sold to Pollution Control Board
authorized & registered recycler M/S
S.K. Metal Industries, Rajkot & M/S
Mateshwari Metals, Surat
11 Spent Carbon
(Solid) 36.2/I MT 141.63
The waste is packed in closed MS drums of 200 Kg
stored in the storage facility having Reinforced
Cement concrete (RCC) floor and covered at the top.
Incineration in VPCL Boiler
12 Wastes or residues
containing oil 5.2 MT 20.5
Stored in the storage facility having HDPE liner,
Reinforced Cement concrete (RCC) floor, covered at
the top & Leachate collection and treatment facility.
Sent to Pollution Control Board
authorized TSDF/Incineration facility
M/s Saurashtra Enviro Projects Pvt.
Ltd. (Bhachau)
13
Insulated Copper
Cable with PVC
Sheathing (Solid)
7/IV MT 0.86
At Warehouse Sold to Pollution Control Board
authorized & registered recycler M/s
Rechotech E-waste Management.
Table no. 21 B: details of HW disposed during the FY 2017-18.
Type of Waste as
authorized in CC &A Date of Dispatch Unit
Quantity dispatched in
FY17
Recycler/Reprocessor/
Coprocessor details
Recycler/Reprocessor/
Coprocessor authorization details
Used Lubricating Oil
17.05.17
KG
7500
M/s Reliance Barrels Supply
Co, Ahmedabad AWH 61732 Valid till 12/02/2019
26.08.17 8680
31.08.17 7560
27.02.18 2320
Discarded Empty Drums Throughout the
Year Nos. 11380
M/s Reliance Barrels Supply
Co, Ahmedabad AWH 61732 Valid till 12/02/2019
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Spent Catalyst from
Various units (Spent Ni-Co-
Mo Catalyst)
Throughout the
Year MT
337 M/s Rubamin Ltd., Baroda AWH 66619 Valid till 02/11/2019
26 M/s, Vyankatesh Metals &
Alloys, Indore
MPPCB/INDORE/REG/NEW/12/B
Valid till 14/09/2019
98
M/s Refracast Metallurgical
(P) Ltd, Raipur
1962/RO/TS/CECB/2007 valid till
31/03/2018
Spent Catalyst from
Various units (Spent ZnO
Catalyst)
28.06.17
MT
52.56 M/s Bravo Agrotech,
Surendranagar AWH-89563 Valid till 19/09/2022
22.02.18 27.8
Spent Resins Waste 05.10.17 MT 12.58 M/s Recycling Solutions Pvt.
Ltd. Panoli, Ankleshwar AWH-83687, Valid till 31/12/2021
Lead Acid Batteries Throughout the
Year MT 17.68
M/s S.K. Metal Industries,
Rajkot & M/s Mateshwari
Metals Olpad (Surat)
AWH 48984 Valid till 07/05/2017
AWH 63034 valid till 09/03/2019
E waste 06.02.18
08.02.18 MT
8.7
M/s Eco Green Recycling,
Valsad
AWH-85342 valid till 11/01/2020
Heater Deposits 04.12.17 MT 14.57
M/s Recycling Solutions Pvt.
Ltd. Panoli, Ankleshwar AWH-83687, Valid till 31/12/2021
Spent Carbon 36.2/I MT 7.13 M/s Recycling Solutions Pvt.
Ltd. Panoli, Ankleshwar AWH-83687, Valid till 31/12/2021
Insulated Copper Cable
with PVC Sheathing 28.03.18 MT 15.45
M/s Rechotech E-waste
Management AWH 72839 Valid till 22/04/2020
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 21 C Details of HW generated & disposed for the Month of April’2018 to September’2018.
Type of Waste Opening Stock as
on 01.04.2018
Generation till
30.09.2018
Disposal till
30.09.2018
Closing Stock as
on 30.09.2018
Disposal Mode
Oily sludge from ETP 379.10 3975.30 4148.71 205.69 Inhouse reprocessing in DCU unit
Used Lubricating Oil 34.94 17.61 27.34 25.21 Sold to authorized recycler M/s Reliance Barrels
Discarded Empty
Drums
8443.00 7626.00 8747.00 7322.00 Sold to authorized recycler M/s Reliance Barrels
Slop Oil 0.00 14090.00 14090.00 0.00 Inhouse reprocessing
Spent Catalyst from
Various units (Spent Ni-
Co-Mo, Spent ZnO,
Spent Super Claus,
Spent TK250)
39.83 45.17 85.00 0.00 27.48 MT Spent ZnO Catalyst sent to authorized
recycler M/s Bravo Agrotech. 57.70 MT Spent Ni-
Mo Catalyst sent to authorized recycler M/s
Rubamin limited
Lead Acid Batteries 4.22 4.27 0.00 8.49 ─
E waste (SCRAP CFL) 3.67 19.30 0.00 22.97 ─
Oily Sludge and BSW 387.50 0.00 337.61 49.89 Sent to authorized Incineration facility M/s
Saurashtra Enviro Projects Pvt Ltd
Oily Cotton Rags/ Oil
Contaminated Waste
8.39 8.89 4.71 12.57 Sent for coprocessing to M/s Ultratech Cement
Spent Carbon 0.00 67.11 67.11 0.00 Resuing as fuel in Power Plant Boilers
Insulated Copper Cable
with PVC Sheathing
189.09 2.34 124.34 67.09 Sold to authorized recycler M/s Recotech
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Spent catalysts shall be regenerated and waste oil will
be sold to the registered recycler only.
Spent catalyst generated from refinery is being sold to actual users. Details for last six month is
shown in Table no. 22.
Table no. 22
Opening
Stock as on
01.04.2018
Generation
till
30.09.2018
Disposal
till
30.09.2018
Closing
Stock as on
30.09.2018
Disposal Mode
Spent Catalyst
from Various
units (Spent
Ni-Co-Mo,
Spent ZnO,
Spent Super
Claus, Spent
TK250)
39.83 45.17 85.00 0.00 27.48 MT Spent ZnO
Catalyst sent to
authorized recycler
M/s Bravo Agrotech.
57.70 MT Spent Ni-
Mo Catalyst sent to
authorized recycler
M/s Rubamin
limited
Used/spent oil generated from equipment is being sold to GPCB authorized recyclers as shown
in Table no. 23.
Table no. 23: Used Oil generated & disposed
Opening
Stock as on
01.04.2018
Generation
till
30.09.2018
Disposal
till
30.09.2018
Closing
Stock as on
30.09.2018
Disposal Mode
Used
Lubricating Oil 34.94 17.61 27.34 25.21 Sold to authorized
recycler M/s Reliance
Barrels
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Copy of work order with hazardous waste authorized recycler is attached as Annexure-1.3.
Manifest copies for the hazardous waste disposed is attached as Annexure-1.4.
Refinery is already a member of GPCB approved TSDF facility of M/s Saurashtra Enviro Projects
Pvt Ltd (SEPPL) located at Gandhidham and M/s Recycling Solution Pvt Ltd (RSPL), Panoli.
Membership certificate is shown below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XXIV Oily sludge shall be sent to melting pit treatment for
recovery of oil. The recovered oil shall be recycled into
the refinery system.
The residual sludge will be stored in HDPE lined pit for
disposal after treatment. The sludge will be
incinerated in the premises only.
Oily sludge is being co-processed in Delayed coker unit.
Oily sludge is being stored in sludge drying pit with HDPE liner & leachate collection facility and
is being sent to Delayed coker unit for co-processing in our refinery.
XXV The project authorities shall strictly comply with the
provisions made in Manufacture, Storage and Import
of Hazardous Chemicals rules, 1989 as amended in
2000 for handling of hazardous chemicals.
We are in compliance with all the applicable conditions under MSIHC Rules 1989.
The details of the compliance of the applicable conditions are as given in the Table no 24.
Table no. 24: compliance of the applicable conditions of MSIHC
Sr. No Condition Compliance Status
1 An occupier who has control of an industrial activity in
term of sub-rule (I) shall provide evidence to show that he
has,-
(a) identified the major accident hazards; and
a) Refinery has identified all the
hazards linked with all kinds
of operational,
administrative and technical
activities. Each department
and units have their Aspect
Impact Risk Register as per
the activities being carried
out which is being updated
timely.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
(b) taken adequate steps to -
(i) prevent such major accidents and limit their
consequences to persons and the environment;
(ii) Provide to the persons working on the site with the
information, training and equipment including antidotes
necessary to ensure their safely.
b)
(i) Refinery has well established
safety systems and procedures
in place. It also has Emergency
Response Disaster Management
Plan for prevention of major
accidents. Mock drills are carried
out timely as a part of
prevention plan.
(ii)Refinery has dedicated
training centre known as
Nalanda Knowledge Centre
wherein Induction training
including fire fighting, first
aider, safety system
awareness is being allotted to
all the employees and
contractors. In addition to this,
Emergency Response Disaster
Management Plan training,
first aider training and safety
refresher training is allotted
every three years to all the
personnel.
2 An occupier shall prepare and keep up-to-date an on-site
emergency plan detailing how major accidents will be
dealt with on the site on which the industrial activity is
Refinery has Emergency
Response Disaster Management
Plan in line with the industrial
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Necessary approvals from Chief controller of
explosives must be obtained before commissioning of
the expansion project.
Requisite On-site and off-site Disaster Management
plans will be prepared and implemented.
Regular mock drill shall be carried out for both On-Site
and Off-site plans.
carried on and that plan shall include the name of The
person who is responsible for safety on the site and the
names of those who are authorized to take action in
accordance with the plan in case of an emergency.
activity as well as crude handling
operations. The Plan is attached
herewith as Annexure 1.6.
3 The occupier shall ensure that the emergency plan
prepared in accordance with sub-rule (I) lakes into account
any modification made in the industrial activity and that
every person on the site who is affected by the plan-is
informed of its relevant provisions.
Refinery has Emergency
Response Disaster Management
Plan in line with the industrial
activity as well as crude handling
operations The Plan is attached
herewith as Annexure 1.6.
4 An occupier, who has control of an industrial activity in
term of sub-rule 1 of this rule, shall arrange to obtain or
develop information in the form of safety data sheet as
specified in Schedule 9. The information shall be accessible
upon request for reference.
Refinery has a separate portal
known as Process Safety
Management portal wherein all
the MSDS as well as chemical
database are available.
All necessary approvals from Chief Controller of Explosives have been obtained prior
commissioning of the expansion project.
Detailed approval from PESO are attached as Annexure 1.5.
Emergency Response Disaster Management Plan (ERDMP) for onsite and offsite has been
prepared and is attached herewith as Annexure 1.6.
Regular mock drills on ERDMP are conducted. Schedule of the Mock drill for the year 2018-19 is
as given in Table no. 25.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Table no. 25: Mock drill schedule for the year 2018-2019
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Mock drill carried out during the month of Mar’18 to Aug’18 is shown in Table no. 26 and
detailed reports are attached as Annexure-1.7.
Table no. 26: Mock Drill details
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Plant Date
NHT/CCR 15.06.2018
Laboratory 25.07.2018
FCCU 27.08.2018
XXVI Green belt shall be provided to mitigate the effects of
fugitive emissions all around the plant in a minimum
of 33% of the plant area in consultation with DFO as
per CPCB guidelines.
Green Belt has been developed in area of 410 Ha around the periphery and in vacant area*.
Apart from this we have also done voluantary mangrove aforestation in area of 175 Ha.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
*Note : currenltly 20 MMTPA refinery is established in 1171 Ha area out of total project
area of 2275 Ha. As per the current establishment, we have developed green belt in 410
Ha area which is 35.04 % of the plant area.
We confirm to develop the balance green belt area required for the 46 MMTPA refinery
to make minmimum 33% of total Plant area as green belt.
The layout map showing existing & proposed green belt is as attached herewith as
Annexure-1.8.
XXVII The company shall strictly follow all the
recommendations mentioned in the Charter on
Corporate Responsibility for Environmental Protection
(CREP).
CREP compliance report is attached as Annexure-1.9.
XXVIII The Company shall harvest surface as well as
rainwater from the rooftops of the buildings proposed
in the expansion project and storm water drains to
recharge the ground water and use the same water for
the various activities of the project to conserve fresh
water.
Four reservoirs / ponds have been created within refinery premises for storage and recharging of
ground water. Total capacity of these ponds is 3, 25,000 m3.
Four ground water recharge wells have been made within refinery.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XXIX Occupational Health Surveillance of the workers shall
be done on regular basis and records be maintained
as per the Factories Act.
Occupational health Surveillance of the worker is being done six monthly and records are
maintained at Occupational Health Centre (OHC) at refinery site as per Factory Act.
Some of the records are shown below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
XXX All the recommendations made in the EIA / EMP and
Risk Assessment Reports in respect of environmental
management and risk mitigation measures relating to
refinery and petrochemical complex shall be
implemented.
All recommendations made in the EIA / EMP and Risk Assessment Reports in respect of
environmental management and risk mitigation measures relating to refinery have been
implemented. Details are given below.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Following measures have been adapted as per Environmental Management Plan indicated in EIA for mitigation of adverse impacts on environment
due to Refinery operations:
Air Pollution Prevention / Control Measures:
Air pollution prevention / Control measures adapted at site are as following:
Installed Low Temperature Shell Claus off Gas Treating Units (LT SCOT) at sulfur recovery unit.
Installed Multistage multiple Cyclones in Fluidized Catalytic Cracking & Regeneration unit for particulate emission control.
Installed Amine Absorbers - The fuel gas produced in the refinery contains H2S. This is removed in the Amine absorber columns and the sweet
gas is routed to Refinery fuel gas system. Subsequently H2S is stripped out from rich amine in amine regeneration unit. Lean amine is reused
while H2S is sent to sulfur recovery unit.
Use of Low Sulfur Fuel - Refinery fuel Gas, Natural gas and Fuel Oil are used as fuel in heaters / furnaces.
Installed Low NOX burners in all heaters / furnaces.
Installed Sulfur Recovery Unit having sulfur recovery efficiency 99.9%.
Floating roof tanks: Floating roof tanks are provided for storage of class A products; this reduces HC vapor loss. Double seal has been provided
in order to minimize vapor leakage.
Good Flare Management- all vent offs are connected to the flare to take care emergency releases from refinery plant.
All access roads (internal as wells as external) which is being used are paved either with concrete or bitumen to suppress the dust generation
along the roads.
Air Environment:
The major sources of air emission is process emissions from FCCU, SRU and emissions from fuel burning in the different heaters / furnaces of refinery’s
plant operations. To minimize impacts, major steps taken are following:
Regular monitoring and record keeping of emission at refinery as part of environmental data records.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Monitoring the Performance of Sulfur Recovery Units (SRU) on monthly basis.
Energy conservation schemes have been launched, for instance, steam traps management variable speed control drive.
Leak Detection and Repair Program (LDAR) has been implemented in the refinery. The program includes leak detection of valves, flanges and
pumps etc. Total 35505 nos. of components were monitored during period of Mar’18 to Aug’18.
Stack Monitoring Facility (SMF) have been provided at proper location in all stacks.
Ambient air quality is being monitored simultaneously at 4 locations within refinery premises once a week.
Two Continuous On-line Ambient Air Quality Monitoring stations (CAAQMS) have been installed. The same has been hooked up with CPCB server
since March 2013.
Continuous Emission Monitoring has been hooked up with CPCB server since June 2015.
Noise Environment:
The design of project is such that the sound pressure level in the work area is not exceeding 90 dB (A). Restricted areas are those locations where it is
not reasonably practicable to reduce the noise level below the work area limit. Wherever practicable, attempts have been made to reduce the noise level
below 90 dB (A). The noise level is not exceeding 70 dB (A) during day time and 65 dB (A) during night time at the boundary of the project site. The
equipment have been chosen in such a way that the above noise limit is never exceeded. The noise levels at the nearest habitation after refinery expansion
is less than the stipulated standards of CPCB. Good Standard Operational Procedure, the following generic measures have been implemented in base
refinery and same will be implemented in addition to the existing green belt, in the future expansion of the project:
The major areas of concern for noise generation has been addressed by considering it during procurement of the machinery from vendors, project
implementation stage and by giving correct specification during tender floating.
Monitoring of job and location specific noise levels for compliance with HSE regulations by verifying acceptability of noise levels caused by the
project activities and comparison with noise criteria.
Periodic audiometric test is being conducted for employees working close to noise prone areas, such as compressors, DG Sets, the loading and
unloading sections.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
PPE’s are provided to ensure for eardrum protection of the employees, workers as well as visitors.
Acoustic barriers and silencers have been used in equipment wherever necessary.
Sound proofing / glass paneling have been provided at critical operating stations / control rooms.
Either acoustic barriers/ shelters shall be developed in noisy workplaces or acoustic enclosures are provided for the high noise generating
equipment
Monitoring of ambient noise levels is carried out regularly inside the refinery area.
Water & Waste water Environment:
Water: The main source of water requirement of refinery is sea water. Sea water is drawn from Gulf of Kutchh by a 44 inch pipeline laid from
Gulf of Kutchh to refinery site. Sea water is mainly used as cooling media in cooling towers and for producing sweet water by desalination plant.
Cooling Tower blow down, desalination plant reject and RO reject are sent back to sea via a 52 inch pipeline and diffuser system. Sweet water is
used for producing DM water, steam and potable water and in process / operation.
Wastewater: Main source of wastewater generation is refinery operations. Wastewater is treated in the wastewater treatment plant. Full
quantity of treated waste water, is reused / recycled for cooling towers, fire water make-up and feed to RO plant and green belt.
The quality of treated water is daily monitored to ensure that treated water quality is always in compliance with statutory limits.
Continuous Effluent Monitoring has been hooked up with CPCB server since November’2015.
Land Environment:
Soils in the adjoining areas are sandy loam to silty loam with moderate infiltration rates, amenable to groundwater pollution. Considering this
fact, every precaution have been taken
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
to avoid spillage of oils and other petroleum products on soils to protect groundwater contamination and to avoid any danger to other soil
microbial groups which are sensitive to oil pollution.
Green belt coverage inside the refinery is well maintained.
Adequate storage facility for temporary storage of hazardous and non-hazardous wastes with HDPE liner facility has been created within refinery
premises.
Green Belt Development:
Along the periphery of the Essar Oil’s Refinery at Vadinar, a large green belt has been developed.
410 Ha area is covered under thick Green Belt in refinery and associated facilities.
In respect of activities in the marine national park, the
recommendations of NIO shall be followed for
protection of marine national park.
In respect of activities in the marine national park, the recommendations of NIO have been
implemented for protection of marine national park. Details are given below.
Recommendations of NIO
NIO carried out Environment Impact Assessment (EIA) sequential studies for marine facilities of M/s Nayara Energy Limited (Formerly Known as Essar Oil
Ltd), Vadinar from 1994 onwards. The compliance status of the salient recommendations stipulated in those studies is given in Table no. 27.
Table no. 27: Compliance status of the salient recommendations given by NIO
Sr.no. NIO recommendations Compliance status
01 Diffuser for discharge of return sea water
into Gulf of Kutch
Diffuser has been installed as per the design and recommendations of NIO
02 Overall Risk Assessment of Marine Facility Risk assessment was carried out through the third party, viz. M/s Enviro-Software, Bangalore.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
03 Contingency plan for Oil Pollution Control Based on overall risk assessment, Oil Spill Disaster Contingency Plan has been prepared, vetted
by Indian Coast Guard and then implemented. Attached as Annexure-1.10.
04 Translocation of Corals Coral Translocation was carried out by NIO in consultation with Department of Forests,
Government of Gujarat
05 Periodic Monitoring of Corals and
Mangroves
Initially, monitoring were carried out on half yearly basis for couple of years and thereafter it
were undertaken on yearly basis as per NIO’s recommendation and GoG’s directives. Latest
comprehensive marine monitoring along with the monitoring of Corals & Mangroves was done
by NIO in April 2018.
06 Monitoring of Marine Environment Marine environment is being monitored for water and sediments quality every month by third
party – M/s Gujarat Institute of Desert Ecology (GUIDE), Bhuj from November’2010 onward
07 Erection and Installation of all Marine
Structures
was carried out as per the recommendation of CWPRS (Central Water Power Research Station)
and NIO
08 Periodic Inspection and Replacement of
Flexible Hoses
Periodic inspection and replacement of hoses are carried out as per schedule and maintained
as per OEM, OCIMF and requirements of our Class ABS. The flexible hoses were tested during
Nov’2017 for their integrity as per International norms and most of them were found
satisfactory after pressure test. The balance flexible hoses were replaced with new ones. The
safety breakaway coupling has been provided in the system.
XXXI The company shall undertake all relevant measures, as
indicated during the public Hearing for improving the
Socio-economic conditions of the surrounding area.
CSR activities will be undertaken by involving local
village and administration.
During public hearing following point has been discussed and the compliance of the same as
submitted in GPCB is as given in Table no. 28.
Table no. 28: Compliance status of Public Hearing points on Socio-economic & CSR activities.
Sr.
No
Public Queries PH coordinating Officer’s Reply
Shri Jitubahi Bhatt local villager, stated
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Apart from that we are committed to making positive impact in communities in surrounding
village of Vadinar. We are committed to maintaining the highest standards of CSR in its business
activities. The facilitates development initiatives in line with provisions under the Companies’ Act,
2013, and aligns its vision with Nayara’s philosophy of 4Ps – PEOPLE at the core, PROGRESS
towards aspirations, POWER of synergy, and PASSION with compassion.
1 Due to any Industrial activity people get
direct employment as well as indirect
employment. This company should
therefore keep local village people in direct
employment.
Skilled category people are being recruited
from outside the State. Company should
make necessary arrangement to see that
locals are made skilled and then recruited
these locally skilled people within the
company.
They are already complying with the GR
of Government of Gujarat regarding 85%
of local employment. Since the definition
of the local as stated earlier is restricted
to state of Gujarat as whole and so it is
not within the purview of this company to
change the definition of “locals”. The
company officials further informed that if
qualified persons are available from
nearby area the company is committed to
give top priority to them. List of
employees from nearby local area is
attached as Annexure 1.11.
Shri Dilipbahi Jadeja, Ex Sarpanch of Vadinar, stated
2 Each farmer whose land has been acquires
should be given employment within the
company.
At present no additional land is going to
be acquired. The present land was
acquired way back in 1993. Also that
preference would be given to people of
the nearby village as per their skills.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
3 Fodder for the cattle of nearby villages
should be provided by the company
Fodder distribution in nearby villages is
being done; Infrastructures - Gaushalas of
nearby area have been upgraded.
4 Pipelines for water supply in vadinar village
should be provided by the company.
Water supply Pipeline has been laid to 4
villages namely Mithoi, Zankhar, Singach
& Vadinar and rest 6 villages are provided
with drinking water by road tankers.
Gaushala Construction
Gaushala Renovation
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
The initiatives are strategically designed on the basis of community needs assessment, mapping,
participatory planning and considering local feasibility. In all locations, the local Government's
effort in development is supplemented with the company's resources and facilitation.
Shri Chandubhai Jadeja of village Vadinar, stated
5 The company should give preference in
employing people of nearby area so that
socio economic status of the nearby area
also as upgraded. He further added that
company should initiate for an ITI center in
coordination with Government, so that
youth of the nearby village can take
necessary advantage.
They welcome the suggestion for setting
up an ITI center and would try to support
such institute, if the government proposal
is this regard comes to it. Separate
budget is allocated for under CSR as
shown in table below.
Shri Kishorsinh Jadeje of Jankhar village, stated
6 The company should give employment to
people whose land has been acquired.
At present no additional land is going to
be acquired. The present land was
acquired way back in 1993. However
company has taken 300 people of nearby
area for greenbelt development purpose.
Shri Mahesh Pandya from Paryavaran Mitra, stated
7 Government GR of 85% local employment
should be implemented.
Government GR of 85% local
employment has been already
implemented.
8 Nearby villagers should be given
preference for new recruitment.
If qualified person are available nearby
area, company is giving priority to them.
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
According to this philosophy whatever amount is needed as a part of CSR is spent for surrounding
villagers.
Local people is being trained for technical skill required for plant operation and maintenance.
These local trained people are appointed in plant.
CSR activities undertaken during last five years are shown in Table no. 29:
Table no. 29 CSR activities undertaken during last five years.
CSR Expenditure in Crores
Essar Oil Limited (April 2014 to March 2018)*
Thematic Area 2014-15 2015-16 2016-17 2017-18
Healthcare & Swachh Bharat 1.20 1.48 1.22 2.68
Education, Sport Promotion, Art & Culture 2.37 2.78 1.11 2.06
Environment 0.33 1.33 0.16 3.60
Livelihood & Skill Development 2.86 1.29 1.32 1.61
Rural Development Projects 1.59 4.05 0.92 3.19
Total 8.36 10.92 4.73 13.14
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
* Now Nayara Energy Limited
CSR activities undertaken during Mar’18 to Aug’18 are shown in Table no. 30:
Table no. 30 Expenditure Nayara Energy limited (Mar’18 to Aug’18)
S.No Thematic Area as per companies’ act Sector Name of the Project Expenditure In Cr
1
Eradicating hunger, poverty and
malnutrition, promoting health care,
Sanitation & safe drinking water
Health Community Health Project (Curative and
Preventive) in Khambhaliya and Lalpur Block 0.86
Sanitation Solid waste Management project in 8 villages 0.25
Contribution to India Sanitation Coalition 0.25
2 Promotion of Education, Special
Education & vocational skill
School
Education
Rural Education Project (Gram Shiksha Project; ISA
British Council Project; Shala Pravehotsav) 0.55
3 Entrepreneurship and Startup
Social
Enterpreneu
rship
Building Social Entrepreneurs (Acumen Fund
partnership) 2.15
4 Skill Development
Skill
Developme
nt
ILABSS at ITI Khambhaliya 0.05
5
Ensuring environmental
sustainability, Ecological balance,
wildlife & natural resource
conservation
Livelihood
Agri and Livestock development Program
Livelihood program for women Livelihood program
for fishing community
0.56
Environmen
t (Water
Harvesting,
&
Water Resource Development 0.25
Annexure - 1
PART – II
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Promotion
of Clean
Energy)
Total 4.92
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
I The project authorities must strictly adhere to the
stipulations made by the concerned State pollution
Control Board (SPCB) and the State Government.
We are in compliance with the stipulations made by the concerned Gujarat pollution Control
Board (GPCB) and the State Government.
CCA compliance report is attached herewith as Annexure 1.12.
II No further expansion or modifications in the plant
shall be carried out without prior approval of the
Ministry of Environment and Forests.
We confirm that No further expansion or modifications in the plant will be carried out without
prior approval of the Ministry of Environment and Forests.
III At no time, the emissions should go beyond the
prescribed standards. In the event of failure any
pollution control system adopted by the units, the
respective until should be immediately put out of
operation and should not be restarted until the
desired efficiency has been achieved.
It is ensured that the emission does not go beyond the prescribed standard as per CCA. For the
same continuous emission monitoring of stacks (source of emissions) are provided with online
monitoring analyzers.
Alarm has been set in each stack for each parameter at the 90% value of emission standards
mentioned in CC&A to ensure corrective action in well advance. Operators are 24X7 watching
pollutants emission level of all stacks and immediately actions will be taken in case of failure of
any pollution control device/ system.
IV Adequate number of influent and effluent quality
monitoring stations shall be set up in consultation with
the SPCB.
All effluent from plants is being collected in effluent collection tanks provided & required
treatment is being given to achieve the norms prescribed in CCA for the Effluent Treatment Plant
(ETP). Influent / effluent’s quantities & qualities are being monitored on daily basis in the ETP.
Monitoring results are given below. Apart from this online effluent quality monitoring systems
have been established & hooked up with CPCB server.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Quality of treated waste water for the month of Mar’18 to Aug’18 is given in table no. 31
(carried out by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL accreditation no. for
Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20 ):
Table no. 31: Quality of treated wastewater
Pollutant Parameters Limiting value for concentration
(mg/l except for pH)
Quality of Treated Effluent(mg/l
except for pH)*
Min-Max
pH 6.0-8.5 7.35-7.51
Oil & Grease 5.0 <4
BOD (3 days, 27 ºC) 15.0 9.0 - 13.0
COD 125.0 29.40 - 45.7
Suspended Solids 20.0 10.0 - 16.0
Phenol (as C6H5OH) 0.35 <0.1
Sulphide (as S) 0.50 0.25 - 0.47
Cyanide (as CN) 0.2 <0.05
Ammonia as N 15 <5
TKN 40 <5
P 3 0.22 - 0.56
Cr (Hexavalent) 0.1 <0.1
Cr (Total) 2 <0.001
Pb 0.1 <0.003
Hg 0.01 <0.002
Zn 5 0.04-0.067
Ni 1 0.08-0.12
Cu 1 0.04-0.085
V 0.2 <0.01
Benzene 0.1 <0.001
Benzo(a)- Pyrene 0.2 <0.001
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Regular monitoring shall be carried out for relevant
parameters for both surface and ground water.
We have appointed third party consultant for monitoring of Marine area. Gujarat Institute of
Desert Ecology (GUIDE) engaged to carry out monthly monitoring of marine area to ensure that
marine life is not adversely affected. Apart from GUIDE, we have also appointed National Institute
of Oceanography (NIO) for Comprehensive Marine Monitoring of Marine Ecology off Vadinar on
yearly basis. Report of the GUIDE & NIO is shown below.
Ground water quality of the surrounding villages is monitored six-monthly which was monitored
in Aug’18, results given in Table no. 32.
Ground water quality of the surrounding villages for the month of Mar’18 to Aug’18:
Table no. 32: Ground water quality of the surrounding villages
Parameters Unit Vadinar Timbdi Bharana Mithoi Kathi
Devaliya
Zakhar Singach Kajurada Sodha
Taragadi
pH --- 6.86 7.85 8.15 7.56 7.95 7.36 7.78 8.06 7.75
TDS mg/l 1840 1590 378 1720 1634 1650 1450 730 1040
Chloride mg/l 859 670 220 658 805 305 770 240 410
Sulphate mg/l 338 81 15 97 80 270 94 21 49
T-Hardness mg/l 515 130 200 540 310 505 450 490 385
O & G mg/l <4 <4 <4 <4 <4 <4 <4 <4 <4
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Report of the GUIDE & NIO is shown below:
V Industrial wastewater shall be properly collected and
treated so to conform to the standards prescribed
under GSR 422 (E) dated 1st May 1993 and 31st
December, 1993 or as amended from time.
The treated wastewater shall be utilized for plantation
purpose.
Industrial wastewater is being collected at effluent treatment plant having primary, secondary and tertiary
treatment system for treatment of effluent to meet the standards prescribed. Effluent quality parameter
is within the prescribed limit mentioned in GSR 186 (E) dated 18th March, 2008
Treated water quality for the month of Mar’18 to Aug’18 is given in Table no. 33 A & 33 B.
The entire Treated Effluent is then reused as Fire Water, Service Water , Cooling Towers, horticulture,RO
feed and green belt.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
The results for treated effluent for the month of Mar’18 to Aug’18 (carried out by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL
accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20 ) table no. 33 A & 33 B
Table no 33 A: Quality of treated wastewater
Pollutant Parameters Limiting value for concentration (mg/l
except for pH)
Quality of Treated Effluent(mg/l except for
pH)Min-Max
pH 6.0-8.5 7.35-7.51
Oil & Grease 5.0 <4
BOD (3 days, 27 ºC) 15.0 9.0 - 13.0
COD 125.0 29.40 - 45.7
Suspended Solids 20.0 10.0 - 16.0
Phenol (as C6H5OH) 0.35 <0.1
Sulphide (as S) 0.50 0.25 - 0.47
Cyanide (as CN) 0.2 <0.05
Ammonia as N 15 <5
TKN 40 <5
P 3 0.22 - 0.56
Cr (Hexavalent) 0.1 <0.1
Cr (Total) 2 <0.001
Pb 0.1 <0.003
Hg 0.01 <0.002
Zn 5 0.04-0.067
Ni 1 0.08-0.12
Cu 1 0.04-0.085
V 0.2 <0.01
Benzene 0.1 <0.001
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Online Monitoring results for effluent quality for the period of Mar’18 to Aug’18:
Table no. 33 B: Online Monitoring results for effluent quality
Pollutant
Parameters
Limiting value for concentration
(mg/l except for pH)
Quality of Treated Effluent
Min-Max
pH 6.0-8.5 6.17-8.25
Oil & Grease 5.0 0.97-4.36
BOD 15.0 2.6-14.9
COD 125.0 29.7-90.8
Suspended Solids 20.0 5-16.9
Phenol 0.35 0.01-0.24
Ammonia 15 0.06-5.14
VI The overall noise levels in and around the plant area
shall be limited within the prescribed standards by
providing noise control measures including acoustic
hoods, silencers, enclosures etc. on all sources of noise
generation.
The design of project is such that the sound pressure level in the work area is not exceeding 90
dB (A). Restricted areas are those locations where it is not reasonably practicable to reduce the
noise level below the work area limit. Wherever practicable, attempts have been made to reduce
the noise level below 90 dB (A). The noise level is not exceeding 70 dB (A) during day time and 65
dB (A) during night time at the boundary of the project site. The equipment have been chosen in
such a way that the above noise limit is never exceeded.
The major areas of concern for noise generation has been addressed by considering it
during procurement of the machinery from vendors, project implementation stage and
by giving correct specification during tender floating.
Periodic audiometric test is being conducted for employees working close to noise prone
areas, such as compressors, DG Sets, the loading and unloading sections.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
The ambient noise level shall conform to the
standards prescribed under EPA Rules, 1989 viz. 75
dBA (day time) and 70 dBA (night time).
PPE’s are provided to ensure for eardrum protection of the employees, workers as well
as visitors.
Acoustic barriers or acoustic enclosures and silencers are provided for the high noise
generating equipment.
Sound proofing / glass paneling have been provided at critical operating stations / control
rooms.
The ambient noise level are monitored during day and night in the periphery of refinery and
found to be well within the prescribed standards. The reports of the same are being submitted
to GPCB regularly.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Monitoring results are as given in Table no. 34.
Frequency of monitoring: Monthly
Period: Mar’2018 to August’2018
Table no. 34: Ambient noise level in the periphery
Locations Noise Level, dB(A)
during Day Time
06:00 am to 10:00 pm
Noise Level, dB(A)
during Night
Time
10:00 pm to 06:00
am
Ambient Station at Port A Camp1 50 - 53 49 - 51
Ambient Station at Labour Gate1 52 - 53 50 - 52
Ambient Station at West side of Main Flare1 49 - 52 47 - 50
Nr. Batching Plant 52 - 53 51
Ambient Station at 93 Gate 50 - 52 49 - 51
Storm water drain outlet 51 - 54 50 - 52
Ambient Station at Refinery Main Gate1 51 - 52 49 - 51
Essar Petrol Pump (Near Delhi Darbar) 51 - 55 50 - 53
Ambient Station at Pet Coke Rail Loading
Yard
51 - 52 48 - 50
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Ambient Air Quality standards in terms of
Noise for industrial area
75 dB(A) 70 dB(A)
VII Authorization from the State Pollution Control Board
must be obtained for collection / treatment /storage
/disposal of Hazardous wastes.
Consolidated Consent & Authorization has been obtained from Gujarat Pollution Control Board
vide Ref. No AWH-81987 dated 13.10.2016 which is valid till 16.09.2022.
VIII The project authorities will provide RS. 3853.00 Crore
to implement the conditions stipulated by the Ministry
of Environment and Forests as well as the State
Government. Adequate funds for recurring
expenditure shall also be provided. The funds so
provided shall not be diverted for any other purposes.
Funds of Rs. 1089 Crores (The cost of 1089 Crores mentioned here as a part of EMP is for 20
MMTPA refinery against the earmarked cost of 3853 Crores for 60 MMTPA refinery.) have been
ear-marked and implemented for the identified actions as per the EMP. It will not to be diverted
for any other purposes. Details of Year wise expenditure is as given in Table no. 35 A & 35 B.
Table no. 35 A: Year Wise Expenditure incurred in Crores (CAPEX)
Environment Protection
Facilities
Year Wise Expenditure incurred in Crores (CAPEX)
2008-09 2011-12 2013-14 2018-19
Base ETP 53.53 - - -
Base SRU 443.34 - - -
Expansion ETP - 171.40 - -
RO Unit - 75.51 - -
Expansion SRU - 234.07 - -
Hazardous waste shed & Pit - 26.08 - -
Online Ambient Air Quality
Monitoring System - - 2.00 -
Online emission monitoring
analyzers - - - 2.00
Green Belt Development 0.6 5.4 3.9 7.9
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
TOTAL 497.47 513 5.9 9.9
Adequate funds for recurring expenditure are being provided and utilized as indicated below up
to 2017-18. Further for future years the funds will be provided and the same shall not be diverted
for any other purposes. The funds for recurring expenditure for the year 2018-19 will not be
diverted for any other purposes.
Table no. 35 B: Year Wise Expenditure incurred in Crores (OPEX)
Environment Protection
Facilities
Year Wise Expenditure incurred in Crores (OPEX)
2013-14 2014-15 2015-16 2016-17 2017-18
Opex - Environment Cost
Centre
1.01 0.19 0.89 1.23 0.81
O & M EXPANSION SRU 0.29 0.09 0.17 6.07 4.25
O & M OF BASE SRU 0.90 0.23 0.36 3.03 0.94
O & M OF EXPANSION WWTF
& RO
10.21 4.31 3.52 5.35 5.06
O & M OF BASE WWTF 0.62 0.20 0.15 0.16 2.05
Green Belt Development 6.6 1.72 1.74 1.5 -
TOTAL 19.63 6.74 6.83 17.34 13.11
IX The stipulated conditions will be monitored by the
concerned Regional Office of this Ministry / Central
pollution Control Board/State Pollution Control Board.
A six monthly compliance report and the monitored
Six monthly compliance and data monitoring report is regularly submitted to MoEF- Bhopal,
CPCB-New Delhi and GPCB - Gandhinagar. Last six monthly EC compliance report has been
submitted vide letter no. EOL/ENV/EC compliance report/2018/741 dated 17/05/2018 to The
Regional Office-MoEF&CC, Bhopal.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
data shall be submitted to them regularly. It will also
be displayed on the website of the Company.
Reports submitted during last three years are as given in Table no. 36:
Table no. 36: Details of EC compliance report submitted
Sr. No. Period for which EC compliance
submitted
Date of report
submitted
Letter reference
01 October’17 to March’18 17/05/2018 EOL/ENV/EC Compliance
Report/2018/741
02 April’17 to September’17 22/11/2017 EOL/ENV/EC Compliance
Report/2018/705
03 October’16 to March’17 06/05/2017 EOL/ENV/EC Compliance
Report/2018/674
04 April’16 to September’16 02/11/2016 EOL/ENV/EC Compliance
Report/2018/642
05 October’15 to March’16 02/05/2016 EOL/ENV/EC Compliance
Report/2018/595
06 October’14 to March’15 02/05/2015 EOL/ENV/EC Compliance
Report/2018/513
Report is also displayed on company website. (Link: https://www.nayaraenergy.com/corporate-
social-responsibility/sustainability)
X The date of financial Closure and final approval of the
project by the concerned authorities and the date of
commencing the land development work as well as
the commissioning of the project will be informed to
the Ministry and its regional Office.
The proposed expansion of 60 MMTPA is not yet complete. Presently we are operating our
refinery at 20 MMTPA. All the necessary approval for the same are in place.
The details of financial closure and final approval of the project at various stages was submitted
to the Ministry and its regional office vide letter no. EOL/ENV/EC refinery/2012/334,
Dated.25.10.2012.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
XI Proper House-keeping and adequate occupational
health program shall be taken up.
Regular Occupational Health Surveillance program for
the relevant diseases shall be carried out and the
records shall be maintained properly for at least 30-40
years.
We have implemented 5S work place management systems for continuous improvement in
workplace.
Occupational Health Center has been established which takes care of surveillance program and
maintain the records. Staff details is as shown below.
1) Details of Doctors and other Staffs
Doctors:
Dr. Maulesh Patel
Dr. Krutarth Agravat
DR H G SHAH
DR H M BADAMIA
DR NITIN VINZODA
DR ASHOK PATEL
DR PARAG DODIA
DR NICKY SAHOO
DR HARDIK POPAT
WE ARE HAVING VISITING PHYSAICIAN WITH TWICE A WEEK OPD SERVICES
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Nursing staff:
Akash Patel
Ashwin Ajmeriya
Dilip Hirapara
Harish Khatri
Hiren Damaniya
Imran Vadher
Jagadish Parnaliya
Jashu Bandhiya
Jyoti Patel
Mrs.Ramee Bhatiya
Mrs.Samju Mendpara
Prashant Punjani
Radhika Karangia
S.P.Singh
Radhika Karangia
Lab. Technician :
Deepak Lakkad
Divyasha Bhalodiya
Pharmacists:
Mr. R K Donga
2) Frequency of Medical Examination of Employees as well as Contract Staff
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Employees:
• Employees working in hazardous process – Once in six month
• Employees not working in hazardous process – >40 once in year, <40 once in two
year
Contract staff:
• Person working in hazardous process – Once in six month
• Person not working in hazardous process – once in year
3) Summary of the Tests Carried out in brief
Employees:
Once in six months
1. Physical Examination,
2. Vision examination
3. PFT,
4. Blood investigation {CBC, FBS, kidney profile, Liver profile}
5. Urine Routine.
Once in year above + ECG + lipid profile + X ray chest
Contractor staff:
Once in six months
1. Physical Examination,
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
2. Vision examination,
3. PFT,
4. Audiometry,
5. Blood investigation {CBC, RBS, S.Creat, SGPT} and Urine Routine
6. X- Ray chest (if required based on examination).
4) Total Employees in the refinery is – 1747 and Month wise Number of the Employees
and Contract Staff for whom the Medical Examination has been carried out (From
March’2018 to August’2018 is as given below
Month Employees Contract staff
March. 18 - 1517
April. 18 193 1574
May.18 230 1995
Jun. 18 292 1954
July. 18 298 1391
Aug. 18 126 1465
5) Sample of Test Report in last six months for both employees and Contractors is given
below:
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
Sufficient preventive measures shall be adopted to
avoid direct exposure to emission and other
Hydrocarbons etc.
Hydrocarbon and H2S detectors have been installed in strategic locations at all the units. Apart
from this it is mandatory to wear respiratory protective equipment when in the unit. Timely H2S
and hydrocarbon awareness training is being given to all the contract workman as well as
employees.
Annexure - 1
PART – II & III
COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE FOR EXPANSION OF REFINERY FROM 9 MMTPA TO 60 MMTPA AND PETROCHEMICAL COMPLEX AT
KHAMBHALIA, JAMNAGAR
EC No. : J-11011/320/2006-IA-II (I) dated 16th September, 2008
Sr. No. GENERAL CONDITIONS ACTION TAKEN REPORT
XII A separate environment management cell with full
fledge laboratory facilities to carry out various
management and monitoring functions shall be set
up under the control of Senior Executive.
The Environment Management Cell is in position, headed by senior executive and reports
directly to the Director. Technical qualification of staff is as shown in Table no.37.
Head HSEF Directly reports to Director Refinery.
Table no.37: Details Environment Management Cell
Sr. No. Name of the Person Designation Technical Qualification
1 P. R. Dixit VP & Head- HSEF M. Tech Environment
2 Asmita Patel Head Environment M. Tech Environment
3 Priya Ayengar Sr. Manager
Environment
B.E Electrical & PG Diploma in
Environment & Sustainability
4 Harshit Shah Manager
Environment
B.E Electrical & PG Diploma in
Environment & PG Diploma
Safety
5 Ravirajsinh Gohil Dy. Manager
Environment
M. Tech Environment
6 Nirav Patel Dy. Manager
Environment
M. Tech Chemical & PG
Diploma in Industrial Safety
We already have well equipped laboratory & with required technical staff. Details attached as
Annexure 1.13.
Annexure 1.1 GSR Compliance
Page 1 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
I Industry shall comply with new standards/ norms for Oil Refinery
Industry under the Environment Protection Rule 1986 vide GSR
186 (E) dated 18th March 2008
A. Effluent
We are in compliance with the various stipulations made for Oil & Gas Industries
in EPA Rules, 2008 by Ministry of Environment & Forest.
A) Effluent: ETP with primary, secondary & tertiary treatment units is
provided to treat the industrial effluent. The results for treated effluent for
last six month is tabulated below. All parameters are well below the
prescribed limits as shown in Table no. 01 A & 01 B.
Manual monitoring result of treated effluent for the month of Mar’18 to Aug’18 carried out by M/s Unistar Environment & Research Labs Pvt. Ltd.
(NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20:
Table no. 01 A: Manual monitoring result of treated effluent for the month of Mar’18 to Aug’18
Pollutant Parameters Limiting value for
concentration (mg/l
except for pH)
Quality of Treated Effluent
Min-Max
(mg/l except for pH)
pH 6.0-8.5 7.35-7.51
Oil & Grease 5.0 <4
BOD (3 days, 27 ºC) 15.0 9.0 - 13.0
COD 125.0 29.40 - 45.7
Suspended Solids 20.0 10.0 - 16.0
Phenol (as C6H5OH) 0.35 <0.1
Sulphide (as S) 0.50 0.25 - 0.47
Cyanide (as CN) 0.2 <0.05
Ammonia as N 15 <5
TKN 40 <5
P 3 0.22 - 0.56
Cr (Hexavalent) 0.1 <0.1
Cr (Total) 2 <0.001
Pb 0.1 <0.003
Annexure 1.1 GSR Compliance
Page 2 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Hg 0.01 <0.002
Zn 5 0.04-0.067
Ni 1 0.08-0.123
Cu 1 0.04-0.085
V 0.2 <0.01
Benzene 0.1 <0.001
Benzo(a)- Pyrene 0.2 <0.001
Online Monitoring results for effluent quality for the period of Mar’18 to Aug’18:
Table no. 01 B: Online Monitoring results for effluent quality for the period of Mar’18 to Aug’18
Pollutant
Parameters
Limiting value for concentration
(mg/l except for pH)
Quality of Treated Effluent*
Min-Max
(mg/l except for pH)
pH 6.0-8.5 6.17-8.2
Oil & Grease 5.0 0.97-4.4
BOD (3 days, 27 ºC) 15.0 2.60-15
COD 125.0 29.68-90.9
Suspended Solids 20.0 05-17
Phenol (as C6H5OH) 0.35 0.01-0.24
Ammonia as N 15 0.06-5.14
B. Emission B) Emissions: All flue gas & process gas stacks are provided with required
APCM to control the emission. The stack emission results for last six month
is shown in table below. All parameters are well below the prescribed limits
as shown in Table no. 02 A, 02 B 03 A & 03 B.
Annexure 1.1 GSR Compliance
Page 3 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Manual monitoring result of stack emission for the month of Mar’18 to Aug’18 carried out by M/s Unistar Environment & Research Labs Pvt. Ltd.
(NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of T-2239, T-2240 valid till 14.09.20):
(A) Emission through heater’s/furnace’s stacks (Table no. 02 A):
Sr.
No.
PLANT Parameters monitored
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Ni
(mg/Nm3)
Vanadium
(mg/Nm3)
Min-Max Min-Max Min-Max Min-Max Min-Max Min-Max
1 CDU/VDU 15-46 190-255 92-110 15-28 0.030 0.20
2 CDU - II 52-86 443-739 124-157 17-26 0.040 0.29
3 DHDT 7-14 11-41 56-82 5-13 NA NA
4 VGOHT 7-29 26-49 64-84 7-16 NA NA
GPCB Limit (for Sr. No. 1 to 4
above )
100 1700 450 200 5 5
5 NHT/CCR 5-7 11-29 54-80 6-15 NA NA
6 DHDS 4-8 8-12 58-82 6-10 NA NA
7 FCC Feed heater 5-8 12-22 43-108 5-11 NA NA
8 HMU – 1 4-8 22-41 31-82 6-18 NA NA
9 HMU-2 5-8 8-44 21-74 08-12 NA NA
10 DCU - 1 5-8 17-27 57-86 12-26 NA NA
11 DCU - 2 6-8 12-31 37-48 14-27 NA NA
12 DCU - 3 4-7 6-24 32-52 11-26 NA NA
GPCB Limit (for Sr. No. 5 to 12) 10 50 350 150 - -
(B) Emission through processes stacks (Table no. 03 A):
Sr. No. Plant Parameters monitored
Sulfur recovery (%) H2S (mg/Nm3) NOx (mg/Nm3) CO (mg/Nm3)
Min-Max Min-Max Min-Max
1 SRU 99.8 1 18-44 11-22
Annexure 1.1 GSR Compliance
Page 4 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
2 SRU - 1 99.7 1 32-51 10-16
GPCB Limit (for Sr. No. 1 & 2) 98.7 15 350 150
Sr. No. Plant Parameters monitored
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Ni (mg/Nm3) V (mg/Nm3)
Min-Max Min-Max Min-Max Min-Max Min-Max Min-Max
3 FCC
Regenerator
31-62 229-457 72-112 52-273 0.05-0.07 0.21-0.35
GPCB Limit (for Sr. No. 3) 100 1700 450 400 5 5
Legends:
CDU/VDU Crude Distillation Unit / Vacuum Distillation Unit
CDU - II Crude Distillation Unit - II
NHT/CCR Naphtha Hydro Treater/ Continuous Catalytic Reforming
DHDS Diesel Hydro de Sulfurization
FCCU Fluidized Catalytic Cracking Unit
HMU Hydrogen Manufacturing Unit
DHDT Diesel Hydro Treater
VGOHT VGO Hydro Treater
DCU Delayed Coker Unit
SRU Sulfur Recovery Unit
PM Particulate Matter
SO2 Sulfur Dioxide
NOx Oxides of Nitrogen
H2S Hydrogen Sulfide
CO Carbon Monoxide
Ni Nickel
V Vanadium
Annexure 1.1 GSR Compliance
Page 5 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
NA: Not Applicable
The Monitoring report by M/s Unistar Environment & Research Labs Pvt. Ltd. (NABL accreditation no. for Chemical & Biological: TC-7753 in lieu of T-
2239, T-2240 valid till 14.09.20 is attached as Annexure 1.1.1.
Note: The Monitoring is carried out by NABL accredited third party, i.e. Unistar Laboratories Private Limited, Vapi. The NABL accreditation certificate
are shown below:
Annexure 1.1 GSR Compliance
Page 7 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Continuous Emission Monitoring system
Apart from this Continuous emission monitoring system is provided & hooked up with CPCB server for all stacks. Stack emission data for the month of
Mar’18 to Aug’18 are shown in table below:
(A) Emission through heater’s/furnace’s stacks (Table no. 02 B) :
Unit SO2 NOx CO PM
mg/Nm³ mg/Nm³ mg/Nm³ mg/Nm³
Min Max Min Max Min Max Min Max
CDU 77.6 539.08 1.07 137.05 1.16 162.41 2.49 69.21
VDU 59.8 551.73 44.26 98.97 14.72 91.36 3.95 29.13
CDU-II 97.9 1134.29 7.4 199.41 26.83 121.34 4.84 84.54
FCCR 312.3 690.2 112.75 306.75 198.58 373.68 22.82 43.26
NHT/CCR 3.2 37.41 49.01 61.07 7.77 21.15 Will be installed by
TA18* DHDS 7.7 45.68 4.36 67.77 7.74 16.9
FCCH 1.5 43.65 45.58 133.13 5.42 14.4
DHDT 36.4 187.8 11.36 193.55 14.05 145.11
VGOHT 1.3 80.58 3.28 177.39 1.04 177.71
HMU-1 1.3 24.55 0.49 37.28 Will be installed by
TA18 HMU-2 1.2 17.97 0.19 19.97
DCU-1 1.7 42.43 15.49 162.19 17.57 145.99
DCU-2 4.4 43.48 15.9 49.43 2.82 146.5
DCU-3 2.0 39.28 1.06 60.8 9.06 110.64
SRU Not in Consent 30.29 79.82 Will be installed by
TA18
Not in Consent
TA18* - Turn around 2018,Planned in November – December 2018
Annexure 1.1 GSR Compliance
Page 8 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
(B) Emission through processes stacks (Table no. 03 B):
Sr. No. Plant
NOx (mg/Nm3)
Min-Max
1 SRU 2-80
2 SRU - 1 6-21
GPCB Limit (for Sr. No. 1 & 2) 350
Sr. No. Plant
PM
(mg/Nm3)
SO2
(mg/Nm3)
NOx
(mg/Nm3)
CO
(mg/Nm3)
Min-Max Min-Max Min-Max Min-Max
3 FCC
Regenerator
24-43 89-690 68-307 199-374
GPCB Limit (for Sr. No. 3) 100 1700 450 400
Legends:
NA: Not applicable
Note : Calibration detail for analyzers from SAP is shown below:
Annexure 1.1 GSR Compliance
Page 9 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
For CDU I :
Detailed calibration reports for analyzers are maintained in our SAP server. Screen shot of the same is attached as Annexure 1.1.2.
Calibration Schedule:
Annexure 1.1 GSR Compliance
Page 10 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Detailed calibration schedule is attached herewith as Annexure 1.1.3.
Annexure 1.1 GSR Compliance
Page 11 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
ii C-Fugitive Emission
Storage of volatile liquids : General Petroleum Products
1. Storage tanks with capacity between 4 to 75 M3 and total
vapour pressure (TVP) of more than 10 kpa should have Fixed
Roof Tank (FRT) with pressure valve vent.
2. Storage tanks with the capacity between 75 to 500 M3 and
total vapour pressure (TVP) of 10 to 746 kpa should have
Internal Floating Roof Tank (IFRT) or External Floating Roof
Tank (EFRT) of Fixed Roof Tank with vapour control or vapour
balancing system.
1. Not Applicable.
2. Storage tanks with capacity between 75 to 500 m3 and TVP between 10 to 76
kPa are having either External floating roof or Internal Floating roof. Storage
tanks details are shown in Table no.04
Table no.04: Storage Tank with capacity
Tank No Nominal Cap (m3)
161T-456 117
161T-457 395
77T-302 200
77T-201 500
77T-202 500
60T-201 150
80T-101 150
81-T-265 100
176T-102 500
Annexure 1.1 GSR Compliance
Page 12 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
3. Storage tanks with capacity of more than 500 M3 and total
vapour pressure (TVP) of 10 to 76 kpa should have Internal
Floating Roof Tank (IFRT) or External Floating Roof Tank (EFRT)
of Fixed Roof Tank with vapour control system.
3. Storage Tanks having capacity more than 500 m3 and total vapor pressure
between 10 to 76 kPa are having external floating roof (Both single deck and
double deck) and Internal Floating roof; Fixed Roof tanks contain have vapor
control system.
Tank No Nominal Cap
(m3)
61T-001A 16000
61T-001B 16000
61T-220A 15000
61T-220B 15000
61T-221A 15000
61T-221B 15000
61T-222A 6500
61T-222B 6500
61T-222C 6500
61T-250A 15000
61T-250B 15000
61T-250C 15000
61T-250D 15000
61T-250E 15000
61T-250F 15000
61-T-253 1000
61T-260A 30000
61T-260B 30000
61T-260C 30000
61T-260D 30000
61T-301 4000
61T-350A 10000
Annexure 1.1 GSR Compliance
Page 13 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
61T-350B 10000
61T-350C 10000
61T-350D 10000
61T-351A 10000
61T-351B 10000
61T-402 4000
61T-422A 3000
61T-422B 3000
61T-424A 30000
61T-424B 30000
61T-450A 50000
61T-450B 50000
61T-450C 50000
61T-450D 50000
61T-450E 50000
61T-450F 50000
61T-502 2500
61T-503A 20000
61T-503B 20000
61T-503C 20000
61T-503D 20000
61T-520A 10000
61T-520B 10000
61T-520C 10000
61T-550A 10000
61T-550B 10000
61T-560A 20000
61T-560B 20000
Annexure 1.1 GSR Compliance
Page 14 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
61T-560C 20000
61T-560D 20000
61T-552A 3000
61T-552B 3000
61T-552C 3000
61T-552D 3000
61T-620 1000
61T-622 5000
161T-222D 30000
161T-240A 10000
161T-240B 10000
161T-223C 30000
161T-223D 30000
161T-230A 10000
161T-220C 15000
161T-220D 15000
161T-223A 60000
161T-223B 60000
161T-424C 5000
161T-351C 30000
161T-351D 30000
161T-351E 30000
161T-351F 30000
161T-351G 30000
161T-351H 30000
161T-520D 30000
161T-520E 30000
Annexure 1.1 GSR Compliance
Page 15 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
161T-520F 30000
161T-520G 30000
161T-506A 60000
161T-506B 60000
161T-450G 60000
161T-450H 60000
161T-450I 60000
151T-001 30000
151T-002 30000
177T-302B 5000
177T-302C 5000
177T-500C 5000
177T-300A 5000
77T-502A 800
77T-502B 800
77T-500A 4000
77T-500B 4000
77T-501A 800
77T-501B 800
77-400A 10000
77-400B 10000
77-401A 3000
77-401B 3000
77T-301A 900
77T-301B 900
77T-200A 4000
77T-200B 4000
Annexure 1.1 GSR Compliance
Page 16 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
4. The tanks with the capacity of more than 75 M3 and total
vapour pressure of more than 76 kpa should have Fixed Roof
Tank with vapour control system.
77-T-701A 540
77-T-701B 628
60T-101 88000
60T-102 88000
60T-103 88000
60T-104 88000
60T-105 88000
60T-106 88000
60T-107 88000
60T-108 88000
60T-109 88000
60T-110 88000
160T-111 120000
160T-112 120000
260T-115 120000
330-T-001A 3343
331-T-001A 3343
81T-201AX 8640
81T-201-BX 8640
64T-101A 8640
64T-101B 8640
4. Not Applicable
Annexure 1.1 GSR Compliance
Page 17 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
5. Requirement for seals in Floating Roof Tanks:
1. (a) IFRT and EFRT shall be provided with double seals with
minimum vapour recovery of 96 %.
(b) Primary seal shall be liquid or shoe mounted for EFRT.
Maximum seal gap width will be 4 cm and maximum
gap area will be 200 cm2/m of tank diameter.
(c) Secondary seal shall be rim mounted. Maximum seal
gap width will be 1.3 cm and maximum gap area will be
20 cm2/m of tank diameter.
(d) Material of Seal and construction shall ensure high
performance and durability.
2. Fixed Roof Tanks shall be have vapour control efficiency of
95 % and vapour balancing efficiency of 90%.
3. Inspection and maintenance of storage tanks shall be
carried out under strict control. For the inspection, API RP
575 may be adopted. In-service inspection with regard
seal gap should be carried out once in every six months
and repair to be implemented in short time. In future,
possibility of on-stream repair of both seals shall be
examined.
5. Seals are provided in Floating Roof tanks:
1. (a) Double seals are available in both EFR and IFR tanks
(b) Primary seals are foam type seals
(c) Secondary seals are rim mounted and the conditions are met.
(d) High quality foam is used for seal to ensure high performance &
durability.
2. Not applicable
3. LDAR is carried out by operation department; Inspection on the condition
of Rim seal is carried out every year by inspection and repairs carried out
as and when required
Storage of Volatile Liquids: Benzene Storage
1. FRT with vapour to incineration with 99.9 % of removal
efficiency for volatile organic compounds (VOC) shall be
provided.
1. Not applicable
2. Not applicable
Annexure 1.1 GSR Compliance
Page 18 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
2. IFRT/EFRT with double seals, emission-reducing roof
fitting and fitted with fixed roof with vapour removal
efficiency of at least 99% shall be provided.
Solvents for Lube-Base oil production (Furfural, NMP,
MEK, Toluene and MIBK)
IFRT with double seals and inert gas blanketing with
vapour removal efficiency of at least 97% shall be
provided.
(Emission control for Road tank truck/ rail tank wagon loading)
Loading Volatile
Products
Gasoline and Naptha:
(i) VOC reduction, %
(ii) Emission, gm/m3
(i) 99.5
(ii) 5
Benzene:
(i) VOC reduction, %
(ii) Emission, gm/m3
(i) 99.99
(ii) 20
Toluene/xylene:
(i) VOC reduction, %
(ii) Emission, gm/m3
(i) 99.98
(ii) 150
Note:
(i) It shall be applicable for
Gasoline, Naptha, Benzene,
Toluene and xylene loading.
(ii) Road tank truck shall have
bottom loading and rail tank
wagon shall have top
submerged loading.
Annexure 1.1 GSR Compliance
Page 19 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
(iii) Annual leak testing for vapour
collection shall be done.
Standards for Equipment Leaks
1. Approach: Approach for controlling fugitive emissions from
equipment leaks shall have proper selection, installation and
maintenance of non-leaking or leak-tight equipment.
Following initial testing after commissioning, the monitoring
for leak detection is to be carried out as a permanent on-
going Leak Detection and Repair(LDAR) programme. Finally
detected leaks are to be repaired within allowable time
frame.
1. Refinery has designed its equipment as per the standards. Approach has been
provided to all kind of devices and equipment. There is a preventive
maintenance schedule for all the equipment. The testing of hydrocarbons
using detectors was done after commissioning. Radiography was also carried
out to ensure the fittings of all the valves, joints etc.
Refinery has documented management procedure for Leak Detection and
Repair (LDAR) Program. LDAR was carried out in phases. In the first phase the
points were identified by Lab India Instruments Pvt Ltd. In the second phase
the LDAR was carried out by Lab India Instruments Pvt Ltd. From the third
phase the LDAR is being carried in-house using Photoionization principle
through PhotoVac 2020 VOC Meter. Till date no leak has been identified. The
LDAR Report carried out till date has shown in Table no. 05
Table no. 05: LDAR programme for components for various plants
Sr.
No
Unit Dates Total
Component
Monitored
Min
VOC
in
PPM
Max
VOC
in
PPM
Leak
Observed
1 HMU-1 01/03/2018 to
14/03/2018
4238 0 224 Nil
2 HMU-2 15/03/2018 to
30/03/2018
2920 0 0 Nil
3 FCCU 01/04/2018 to
14/04/2018
7481 0 23 Nil
Annexure 1.1 GSR Compliance
Page 20 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
4 Utility-1 15/04/2018 to
29/04/2018
1027 0 61 Nil
5 Utility-2 01/05/2018 to
30/05/2018
491 0 285 Nil
6 DCU 01/06/2018 to
29/06/2018
9601 0.1 5 Nil
7 DHDS 01/07/2018 to
14/07/2018
3022 0 500 Nil
8 NHT/ CCR 15/07/2018 to
30/07/2018
5995 0 800 Nil
9 COT 15/08/2018 to
30/08/2018
281 0.1 16.2 Nil
Calibration report for the instrument used is shown below:
Annexure 1.1 GSR Compliance
Page 22 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
2. Components to be covered: Components that shall be
covered under LDAR programme include (i) Block valves; (ii)
Control valves; (iii) Pump seals; (iv) Compressor seals; (v)
Pressure relief valves; (vi) Flanges – Heat Exchangers; (vii)
Flanges - Piping; (viii) Connectors - Piping; (ix) Open ended
lines; and (x) Sampling connections. Equipment and line sizes
more than 1.875 cm or ¾ inch are to be covered.
2. All the components Valves, Flanges, Glands of the all the equipment are being
covered in the LDAR. The unit wise details of the components are given in
Table no. 06:
Table no. 06:unit wise details of components for LDAR programme
Sr.
No
Unit Valves Flanges Valve
Glands
Seals
1 CDU/VDU/SGU 4081 8786 0 0
2 CDU-II 897 541 0 0
3 NHT/ CCR 2718 1654 1591 32
4 DHDS 885 1754 0 0
5 SRU 697 1673 681 31
6 FCCU 1825 3807 1777 62
7 DHDT 1472 2785 580 15
8 VGOHT 757 1851 737 0
9 HMU-1 1072 2206 1068 0
10 HMU-2 640 2099 181 0
11 DCU 2687 6914 0 0
12 ISOM 1392 3507 0 0
13 COT (281
components)
Tanks – 12 Nos. Pumps – 13 Nos.
14 PIT 72
15 Utility- I 334 367 326 0
16 SRU-I 5170 2245 2007 58
17 Utility - 2 360 120
120 11 0
Annexure 1.1 GSR Compliance
Page 23 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
3. Applicability: LDAR programme would be applicable to
components (given at 2 above) for following
products/compounds: (i) hydrocarbon gases; (ii) Light liquid
with vapour pressure @ 20oC > 1.0 kpa; and (iii) Heavy liquid
with vapour pressure @ 20 oC between 0.3 to 1.0 kpa.
3. LDAR Programme is being carried out for all the components given in the point
2. The List of the Volatile Organic Compounds monitored in the program are
as under:-
4. For Heavy liquids the pipe, valve, flange and all the equipment are timely
checked and Preventive Maintenance is also done in order to avoid any kind
of Leak.
Annexure 1.1 GSR Compliance
Page 24 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
4. While LDAR will not be applicable for heavy liquids with
vapour pressure < 0.3 kpa, it will be desirable to check for
liquid dripping as indication of leak.
5. Definition of Leak; A leak is defined as the detection of VOC
concentration more than the values (in ppm) specified below
at the emission source using a hydrocarbon analyzer
according to measurement protocol (US EPA – 453/R-95-
017,1995 Protocol) for equipment leak emission estimates
may be referred to:
Component General Hydrocarbon
(ppm)
Benzene (ppm)
Till 31st
Dec. 2008
w.e.f.
January
01,2009
Till 31st
Dec. 2008
w.e.f.
January
01,2009
Pump/
Compressor
10000 5000 3000 2000
Valves/
Flanges
10000 3000 2000 1000
Other
components
10000 3000 2000 1000
5. The definition of leak according to the concentration has been incorporated
in the Leak Detection and Repair Program. The same is being followed in the
entire refinery to determine leak and take action accordingly. However, till
date no leak has been observed.
6. In case of any kind of leak noticed by sight, sound or smell it is attended and
repaired immediately. Refinery ensures zero leak.
Annexure 1.1 GSR Compliance
Page 25 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
6. In addition any component observed to be leaking by sight,
sound or smell regardless of concentration (liquid dripping,
visible vapour leak) or presence of bubbles using soap
solution should be considered as leak.
7. Monitoring requirements and repair schedule: Following
frequency of monitoring of leaks and schedule for repair of
leaks shall be followed:
Component Frequency of
monitoring
Repair Schedule
Quarterly (semiannual
after two consecutive
periods with < 2% leaks)
Repair will be
started within 5
working days and
shall be
completed within
15 working days
after detection of
leak for general
hydrocarbons. In
case of benzene,
the leak shall be
attended
immediately for
repair.
Pump Seals Quarterly
Compressor
Seals
Quarterly
7. Refinery has not observed any kind of leak till date. However, LDAR is carried
out in all the units. The detailed schedule for the year 2018-19 is as given in
Table no. 07:-
Table no. 07: Schedule for LDAR programme
Sr. No. Unit Dates
1 FCCU 01/04/18 to 30/04/18
2 Utility-1 01/05/18 to 31/05/18
3 Utility-2
Expansion
01/06/18 to 30/06/18
4 DCU 01/07/18 to 31/07/18
5 DHDS & SRU 01/08/18 to 31/08/18
6 COT, PIT &
NHT/CCR
01/09/18 to 30/09/18
7 DHDT &
VGOHT
01/10/18 to 31/10/18
8 ISOM & SRU-I 01/11/18 to 30/11/18
9 CDU/VDU &
Utility-1 Base
01/12/18 to 31/12/18
10 HMU-II 01/01/19 to 31/01/19
11 HMU I 01/02/19 to 28/02/19
12 CDU-II 01/03/19 to 20/03/19
Annexure 1.1 GSR Compliance
Page 26 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Pressure
relief devices
Quarterly
Pressure
relief devices
(after
venting)
Within 24 hours
Heat
Exchangers
Quarterly
Process
drains
Annually
Components
that are
difficult to
monitor
Annually
Pump seals
with visible
liquid
dripping
Immediately Immediately
Any
component
with visible
leaks
Immediately Immediately
Any
component
after
Within five days
8. No leak has been observed in the Refinery. However, the monitored details
of VOC for the month Mar’18 to Aug’18 is given in Table no. 8:
Annexure 1.1 GSR Compliance
Page 27 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
repair/replac
ement
8. The percentage leaking component should not be more than
2 % for any group of components, monitored excluding
pumps/compressors. In case of pumps/compressors, it
should be less than 10% of the total number of
pumps/compressors or three pumps and compressors,
whichever is greater.
Table no. 8: VOC monitoring details for the month of March’2018 to
August’18
Sr. No Unit Dates
Total
Component
Monitored
Min
VOC
in
PPM
Max
VOC
in
PPM
Leak
Observed
1 HMU-1 01/03/2018 to
14/03/2018 4238 0 0 Nil
2 HMU-2 15/03/2018 to
30/03/2018 2920 0 0 Nil
3 FCCU 01/04/2018 to
14/04/2018 7481 0 23 Nil
4 Utility-
1
15/04/2018 to
29/04/2018 1027 0 61 Nil
5
Utility-
2
Expansi
on
01/05/2018 to
30/05/2018 491 0 107 Nil
6 DCU 01/06/2018 to
29/06/2018 9601 0 5 Nil
7 DHDS 01/07/2018 to
14/07/2018 3022 0 43.6 Nil
8 NHT/
CCR
15/07/2018 to
30/07/2018 5995 0 32 Nil
9 COT 15/08/2018 to
30/08/2018 281 0 15 Nil
Annexure 1.1 GSR Compliance
Page 28 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
9. Emission inventory: Refinery shall prepare an inventory of
equipment components in the plant. After the instrumental
measurement of leaks, emission from the components will be
calculated using stratified emission factors (USEPA) or any
other superior factors. The total fugitive emission will be
established.
9. Refinery had engaged Lab India Instruments Pvt Ltd for identifying the
equipment components in the Phase-I of LDAR. The emissions are calculated
using OISD- GDN- 224 and shown in Table no 09.
Table no. 09.:The total fugitive emission from March’18 to August’18
Units Valves (Total
VOC in PPM)
Flanges
(Total VOC in
PPM)
Valve Glands
(Total VOC in
PPM)
Seals (Total
VOC in PPM)
HMU-1 0 0 0 0
HMU-2 0 0 0 0
FCCU 0 120.1 101.1 0
Utility-1 2.7 127.9 1.8 0
Utility-2
Expansion 1773 0 107 0
DCU 0.2 260 0.4 0
DHDS 2.8 26.2 550.5 0
NHT/ CCR 815.1 773.5 3093.9 0
COT 0 0 0 15
Total 2593.8 1307.7 3854.7 15
Emission
(kg/hr.)
(3.8 X 10^-5) X
(ppm)^0.74
(1.7 X 10^-5) X
(ppm)^0.82
(3.8 X 10^-5) X
(ppm)^0.74
(1.7 X 10^-5) X
(ppm)^0.82
0.0127 0.0061 0.01711 0.00014
Total Kg/
hr. 0.03605
Annexure 1.1 GSR Compliance
Page 29 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
10. Monitoring: Following types of monitoring methods may be
judiciously employed for detection of leaks: (i) Instrumental
method of measurement of leaks; (ii) Audio, visual and
olfactory (AVO) leak detection: and (iii) Soap bubble method.
11. Data on time of measurement and concentration value for
leak detection; time of repair of leak; and time of
measurement & concentration value after repair of leak
should be documented for all the components.
12. Pressure relief and blow down system should discharge to a
vapour collection and recovery system or to flare.
13. Open-ended lines should be closed by a blind flange or
plugged.
14. Totally closed-loop should be used in all routine samples.
10 Photoionization method is used to detect Volatile Organic Compounds
through PhtoVac 2020 combi Pro VOC meter.
11 The format for LDAR consists of date, time, responsible person, minimum
and maximum concentration, data after attending the leak. The same is
being documented. Please find below the format:-
12 Pressure relief systems of all units and blow down systems are connected
to common flare system via separate collection system.
13 All open ended flanged lines are blinded or plugged with seal weld.
14 All routine samples are closed loop and sample point flushing is done
through the same.
15 High quality packing material is used for valves to ensure low emissions.
16 High quality foam is used for seal to ensure high performance & durability.
Annexure 1.1 GSR Compliance
Page 30 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
15. Low emission packing should be used for valves.
16. High integrity sealing materials should be used for valves.
D. Emission Standards for VOC from wastewater collection and Treatment
Annexure 1.1 GSR Compliance
Page 31 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
1. All contaminated and odorous wastewater streams shall be
handled in closed systems from the source to the primary
treatment stages (oil-water separator and equalization
tanks).
2. The collection systems shall be covered with water
seals(traps) on sewers and drains and gas tight covers on
junction boxes.
3. Oil-water separators and equalization tanks shall be provided
with floating/fixed covers. The off-gas generated shall be
treated to remove at least 90% of VOC and eliminate odour.
The system design shall ensure safety (prevention of
formation of explosive mixture, possible detonation and
reduce the impact) by dilution with air/inert gas, installing LEL
detector including control devices, seal drums, detonation
arrestors, etc. The system shall be designed and operated for
safe maintenance of the collection and primary treatment
system.
4. Wastewater from aromatics plants (benzene and xylene
plants) shall be treated to remove benzene & total aromatics
to a level of 10, 20 ppm respectively before discharge to
effluent treatment system without dilution.
1. All AOC (Accidentally Oil Contaminated) and COC(Continuous Oil
Contaminated) of each plant are in closed system .wastewater from AOC
& COC sent to Primary Treatment unit (PTU) for removal of free oil and dirt
by gravity separation through Tilted Plate Interceptor and oil skimmer. In
refinery five PTU is provided at different location. (Process, PIT, RLCB, TLCB,
COT) All the primary treated water are collected & treated in effluent
treatment plant followed by reverse osmosis plant.
2. Collection tanks are covered with RCC top slab.
3. Oil water separator are covered.
4. Not Applicable
Annexure 1.1 GSR Compliance
Page 32 of 31
Compliance status report of the conditions stipulated in the notification published by Ministry of Environment and Forests, New Delhi dtd 18th March,2008
Sr. No. SPECIFIC CONDITIONS ACTION TAKEN REPORT
Quantum limit in Kg/1,000 tonne of crude processed
Parameter 1 Standard 2
Quantum limit in Kg/1,000 of
crude processed
1. Oil & Grease 2.0
2. BOD 3 days, 27oC 6.0
3. COD 50
4. Suspended Solids 8.0
5. Phenols 0.14
6. Sulphides 0.2
7. CN 0.08
8. Ammonia as N 6.0
9. TKN 16
10. P 1.2
11. Cr(Hexavalent) 0.04
12. Cr(Total) 0.8
13. Pb 0.04
14. Hg 0.004
15. Zn 2.0
16. Ni 0.4
17. Cu 0.4
18. V 0.8
19. Benzene 0.04
20. Benzo(a)-Pyrene 0.08
Quantum limit in Kg/1,000 tonne of crude processed for the Month of Mar’18 to
Aug’18 as shown Table no. 10:
Table no.10: Quantum limit in Kg/1,000 tonne of crude processed for the Month
of March’18 to August’18
Parameter 1 Standard 2
Quantum limit in Kg/1,000 of crude processed
1. Oil & Grease 0.05
2. BOD 3 days, 27oC 0.15
3. COD 0.50
4. Suspended Solids 0.18
5. Phenols 0.0013
6. Sulphides 0.0047
7. CN 0.00069
8. Ammonia as N 0.07
9. TKN 0.07
10. P 0.01
11. Cr(Hexavalent) 0.00137
12. Cr(Total) 0.0001
13. Pb 0.0004
14. Hg 0.00003
15. Zn 0.00068
16. Ni 0.00145
17. Cu 0.00090
18. V 0.0014
19. Benzene 0.00001
20. Benzo(a)-Pyrene 0.00001
EQUIPMENT ROOM AT ANALYSER APPLICATION FREQ Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
1000012900 OSA_CDU2 GAS NOX DUCT 3 MON 1000553465 1000570024
1000012901 OSA_CDU2 GAS SOX DUCT 3 MON 1000553466 1000570025
1000025024 OSA_DHDS GAS CO 40F001 HEATER 3 MON 1000527834 1000542858 1000559941
1000025028 OSA_DHDS GAS SOX 40F001 HEATER 3 MON 1000527833 1000542857 1000559940
1000034535 OSA_VDU1 GAS CO HEATER 3 MON 1000553457 1000570016
1000034536 OSA_VDU1 GAS NOX DUCT 3 MON 1000553458 1000570017
1000034541 OSA_CDU1 GAS SOX STACK 3 MON 1000553450 1000570009
1000034542 OSA_CDU1 GAS NOX STACK 3 MON 1000553451 1000570010
1000034545 OSA_VDU1 GAS CO HEATER 3 MON 1000553456 1000570015
1000034568 OSA_FCCU GAS CO STACK 3 MON 1000527910 1000542949 1000560037
1000036218 OSA_HMUM GAS SOX REFORMER STACK 3 MON 1000546331 1000564519
1000036219 OSA_HMUM GAS NOX REFORMER STACK 3 MON 1000546332 1000564520
1000043521 OSA_UTY1 LIQUID PH 197FX001A SERVICE O/L 3 MON 1000542742 1000559753 1000576247
1000044625 OSA_HMU1 GAS SOX REFORMER STACK 3 MON 1000532288 1000547207
1000044626 OSA_HMU1 GAS NOX REFORMER STACK 3 MON 1000532287 1000547206
1000064339 OSA_SRU1 GAS NOX STACK 3 MON 1000542589 1000559569 1000576121
1000064340 OSA_SRU1 GAS SOX STACK 3 MON 1000542590 1000559570 1000576122
1000068593 OSA_DCU GAS NOX 121F101 COKER HEATER STACK 3 MON 1000532300 1000547219
1000068628 OSA_DCU GAS SOX 121F103 COKER HEATER STACK 3 MON 1000532322 1000547241
1000070154 OSA_UTY2 LIQUID COD D/B SWT WATER PUMP 3 MON 1000554430 1000571071
1000070155 OSA_UTY2 LIQUID PHENOL D/B SWT WATER PUMP 3 MON 1000554431 1000571072
1000070156 OSA_UTY2 GAS NH3 D/B SWT/SALT WATER PUMP 3 MON 1000554432 1000571073
1000070164 OSA_UTY2 LIQUID PH RO TREATED EFFLUENT 3 MON 1000542919 1000559992 1000576547
1000071525 OSA_UTY2 LIQUID COD D/B SALT WATER PUMP 3 MON 1000554435 1000571076
1000071527 OSA_UTY2 LIQUID TSS AOC COC ACF COM DISCHARGE 3 MON 1000554418 1000571059
1000071534 OSA_UTY2 GAS NH3 SALT BIO TWR FEED PUMP 3 MON 1000554422 1000571063
1000071539 OSA_UTY2 LIQUID TSS SW ACF COM DISCHARGE 3 MON 1000554427 1000571068
1000071540 OSA_UTY2 LIQUID PHENOL D/B SALT WATER PUMP 3 MON 1000554437 1000571078
1000077394 OSA_AQMS GAS PM2.5 AMB AIR NEAR RLCB 3 MON 1000537719 1000554309
Annexure 1.1.3 Calibration Schedule
1000077395 OSA_AQMS GAS PM10 AMB AIR NEAR RLCB 3 MON 1000537720 1000554310
1000077396 OSA_AQMS GAS SOX AMB AIR NEAR RLCB 3 MON 1000537711 1000554301
1000077397 OSA_AQMS GAS NH3/NOX AMB AIR NEAR RLCB 3 MON 1000537712 1000554302
1000077398 OSA_AQMS GAS CO AMB AIR NEAR RLCB 3 MON 1000537713 1000554303
1000077400 OSA_AQMS GAS PM2.5 AMB AIR NEAR LABOUR GATE 3 MON 1000537721 1000554311
1000077401 OSA_AQMS GAS PM10 AMB AIR NEAR LABOUR GATE 3 MON 1000537722 1000554312
1000077402 OSA_AQMS GAS SOX AMB AIR NEAR LABOUR GATE 3 MON 1000537715 1000554305
1000077403 OSA_AQMS GAS NH3/NOX AMB AIR NEAR LABOUR GATE 3 MON 1000537716 1000554306
1000077404 OSA_AQMS GAS CO AMB AIR NEAR LABOUR GATE 3 MON 1000537717 1000554307
1000077442 OSA_FCCU GAS SOX FGD STACK 3 MON 1000527911 1000542950 1000560038
1000077443 OSA_FCCU GAS NOX FGD STACK 3 MON 1000527908 1000542947 1000560035
1000079434 OSA_HMU2 GAS SOX REFORMER STACK 3 MON 1000539392 1000567090
1000079435 OSA_HMU2 GAS NOX REFORMER STACK 3 MON 1000539393 1000567093
3000002430 OSA_FCCU GAS CO HEATER 3 MON 1000527915 1000542954 1000560042
3000002435 OSA_FCCU GAS NOX STACK 3 MON 1000527913 1000542952 1000560040
3000002436 OSA_FCCU GAS SOX STACK 3 MON 1000527912 1000542951 1000560039
3000004206 OSA_UTY1 LIQUID PH EFFLUENT PUMP DISCHARGEHARGE
HEADER
3 MON 1000554215 1000570823
3000005522 OSA_CCR GAS SOX DUCT 3 MON 1000546307 1000564499
3000005523 OSA_CCR GAS NOX DUCT 3 MON 1000546308 1000564500
1000084972 OSA_HMU1 GAS H2S NG COMPRESSOR (SAT GAS) PRVN
ABONDENDE
D ROA1000034482 PIT Sulphur HSD
1000077424 PIT DISTILLAITON HSD HEADER 2 BLENDING
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 1 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
Procedure for Leak Detection and Repair Program
Document Number NAYA-MGT-HSEF-ENV-01
Version / Revision 01 / 00
Date 28 / AUG / 2018
Prepared by System Coordinator
Reviewed by Head HSEF Head Technical
Approved by Director and Head of Refinery
Annexure 1.2 LDAR Procedure
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 2 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
AMENDMENT DETAILS
Amendment Discard Insert Notes on Amendments
No Date dd.mm.yyyy
Details RevNo. Details Rev No.
1 28.08.2018 Old Procedure EOL–
MGT–DP–TS–ENV-
001
03 Revised
Procedure
NAYA-MGT-
HSEF-ENV-01
01.00
2 28.08.2018 EOL ESSAR OIL Essar Logo ERIMS
03 NAYA (In Doc. Numbering) Nayara Energy Limited Nayara Logo RIMS
01.00 Organizational Change Requirement
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 3 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
Contents
AMENDMENT DETAILS ...........................................................................................................................................- 2 -
1. OBJECTIVE ......................................................................................................................................................- 4 -
2. SCOPE ............................................................................................................................................................- 4 -
3. DEFINITIONS: .................................................................................................................................................- 4 -
3.1. Volatile Organic Compounds (VOC): .....................................................................................................- 4 -
3.2. Fugitive Emission: ..................................................................................................................................- 4 -
3.3. Essential Equipment: .............................................................................................................................- 4 -
3.4. Leak: ......................................................................................................................................................- 5 -
4. PROCEDURE FOR MONITORING: ...................................................................................................................- 5 -
5. MONITORING REQUIREMENTS & REPAIR SCHEDULE: ..................................................................................- 6 -
6. PRECAUTIONS: ...............................................................................................................................................- 6 -
7. RESPONSIBILITY: ............................................................................................................................................- 7 -
7.1 Head Operations is responsible for: ......................................................................................................- 7 -
7.2 Head Environment is responsible for: ...................................................................................................- 7 -
7.3 Head Maintenance is responsible for: ..................................................................................................- 7 -
8. REFERENCES: .................................................................................................................................................- 7 -
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 4 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
1. OBJECTIVE
This procedure includes identification of fugitive emission sources, procedure for monitoring,
repair schedule, reporting and record keeping in a systematic manner.
2. SCOPE
This procedure is applicable for identification and control of fugitive VOC emissions from
process plants, Rail & Truck loading are, Crude oil tankage & Product intermediate tankage
area of Refinery.
Equipment or accessories which include pump seals, compressor seals, seal oil degassing
vents, flanges of heat exchangers, pipeline valves, flanges and other connections, pressure
relief devices, process drains, open-ended pipes, sampling connections etc. that could
potentially leak to emit VOCs into the atmosphere are the components covered under LDAR.
The scope excludes:-
Lines having diameter < 1 inch
Chemical compounds used or stored which has vapour pressure < 0.3 kPa at 20 oC
however to be checked for liquid dripping
Equipment under vacuum service
3. DEFINITIONS:
Volatile Organic Compounds (VOC): These are the organic compounds whose vapour pressure at 20oC exceeds 1.0 kPa (0.145
psi). As a result, these can easily become vapour or gas from the solid or liquid state.
Fugitive Emission: Also known as “equipment leaks”, the fugitive emissions are the result of leaks of volatile
organic compounds from components as above including the hydrocarbon transfer lines and
associated equipment.
Essential Equipment: Any equipment in the process whose outage from service will cause cut in unit throughput
by 33%.
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 5 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
Leak: Gaseous hydrocarbon emission found to be in excess of 5000 ppm, when measured by a
portable hydrocarbon detector at a distance of one (1) centimetre from the surface of
potential source with the instrument calibrated with methane. However, in case of Benzene,
which is highly carcinogenic, the leak is defined as the emission value measured in excess of
2000 ppm above the background concentration level.
Regardless of concentration, a leak is also identified by sight, sound or smell at a component
caused by liquid dripping or vapour leak, which is sometimes visible through bubbles in
presence of soap solution. The dripping of liquid VOCs at a rate of more than three (3) drops
per minutes can be construed as leak.
*AS PER MOEF NOTIFICATION DTD.18TH MARCH’2008, POINT NO.2 (C) 5
4. PROCEDURE FOR MONITORING:
The VOC Meter should be assembled and started in open & clean atmosphere.
The instrument should be calibrated as per recommendation of instrument supplier.
Concentration of VOCs emitted by the leaking component should be checked at the
surface interface (e.g. at the interface between a valve stem and packing).
The probe inlet should be placed at the surface of the component interface where there
is possibility of Leak. It should be moved along the periphery while observing the
instrument readings.
The interface where leakage is indicated should be sampled slowly until the maximum
reading is obtained. If the maximum reading exceeds the defined concentration limit then
record the reading. Set the meter to zero reading and again take the maximum reading for
cross verification.
Components Generated Hydro Carbon (ppm)* Benzene (ppm)*
Pump/compressor 5000 2000
Valves/flanges 3000 1000
Other
components 2000 1000
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 6 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
Record the readings of the identified points in a structured format given in the Annexure
– I
5. MONITORING REQUIREMENTS & REPAIR SCHEDULE:
Component Frequency of monitoring Repair schedule
Quarterly (semiannual after two consecutive periods with <2% leaks and annual after five periods with <2% leaks)
Repair will be started within 5 working days and shall be completed within 15 working days after detection of leak for general hydrocarbons. In case of benzene, the leak shall be attended immediately for repair.
Pump seals Quarterly
Compressor seals Quarterly
Pressure relief devices
Quarterly
Pressure relief devices (after venting)
Within 24 hours
Heat exchangers Quarterly
Process drains Annually
Components that are difficult to monitor
Annually
Pump seals with visible liquid dripping
Immediately Immediately
Any component with visible leaks
Immediately Immediately
Any component after repair/replacement
Within five days --
*AS PER MOEF NOTIFICATION DTD.18TH MARCH’2008, POINT NO.2 (C) 7
6. PRECAUTIONS:
The probe of the instrument should be about 1 cm from leaking interface, in upwind
direction from any component to be inspected.
Tip of the probe should not touch greasy areas. It should always remain clean and
thorough.
Monitoring activities may be avoided during rain to protect the analyzer from bad
weather.
LDAR training should be given to all the concern personnel monitoring VOC Concentration
at their unit.
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 7 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
7. RESPONSIBILITY:
7.1 Head Operations is responsible for: Identifying the points as per P & ID
Monitoring each component as mentioned in point no. G at regular interval.
Identifying the leaky points as per point no. E (5).
Coordinating with maintenance department for attending the leaks.
Compiling the leak survey report in a structured format given in the Annexure – I
Ensuring repeat survey after attending the leaks.
Submitting the records to Environment department.
The Leaks which cannot be repaired during operation must be tagged separately to
attend them during next shutdown of the facility.
Prepare a master list of equipment, components and the points which are to be
monitored in these components.
7.2 Head Environment is responsible for: Maintaining consolidated report of fugitive emissions in Overall Refinery in the format
as per Annexure II.
Ensuring that LDAR program running as per schedule.
7.3 Head Maintenance is responsible for: The repairing/replacing of the leaky equipment/joints in coordination with operation
8. REFERENCES:
Charter on Corporate Responsibility for Environmental Protection from the Central
Pollution Control Board.
MoEF notification dtd.18th March’2008
US-EPA Method 21, regarding Determination of Volatile Organic Compound Leaks.
OISD-Guidelines - 224, Monitoring and Control of Volatile Organic Compounds
emission.
Environment Clearance given by MoEF, vide letter no: J-11011/320/2006-IA-II (I),
dated 20 July-2007 amended on 16/09/2008 and 16/09/2018
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 8 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
ANNEXURE-I
VOC Monitoring Report
UNIT –
ANNEXURE – II
LDAR CONSOLIDATED REPORT
Sr.
No.
Units
monitored
Total nos. of
Components
monitored
Total nos. of
leaky points
found
Min TVOC
observed
(PPM)
Max TVOC
observed
(PPM)
Location
where Leak
found
VOC before
attending
leak (PPM)
VOC before
attending
leak (PPM)
Refinery Integrated Management System
NAYA-MGT-HSEF-ENV-01 Rev: 01.00 Dated: 28.08.2018 - 9 - of 9
Procedure for Leak Detection and Repair Program (LDAR)
LIST OF ANNEXURES
SR. NO. ANNEXURE DETAILS PAGE NO
1 ANNEXURE – I VOC MONITORING REPORT 8
2 ANNEXURE – II LDAR CONSOLIDATED REPORT 8
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A, Gandhinagar-382 021.Website: www.gpcb.gov.in
Bv R.P.A.D.
In exercise of the power conferred under section-25 of the Water (Prevention a;d Control ofPollution) Act-1974. under section-21 of the Air (Prevention and Control of Pollution)-1981 andAuthorisation under rule 3(c) & 5(5) of the Hazardous \\aste ('.lanagement and Handling)Rules" 1989& as amended up to year 2003 framed under the Environmental (Protection) Act-l986.
And whereas Board has received consolidated consent application lener dated 131021201-1forthe Consolidated Consent and Authorizatioo (CC & A) of this Board under the provisions rules of
the aforesaid Acts. Consents & Authorization are hereby granted as under:
CONSENTS AND AUTHORISATION:(under the provisions /rules of the aforesaid environmental acts)
To;MIS. RELIANCE BARREL SUPPLY CO,PLOT NO: 200/34, B/H. KASHIR TEXTILE MILL,NAROL-DlST,AHMEDABAD.
I. Consent Order No. AWH- 61732 dale of Issue: 18/04120142. The consents shall be valid up to 12102/2019 lor use of outlet lor the discharge of trade
effluent & em iss ion due to operation of industrial plant for manllt~lCtllre of the followingitems/products:
Sr.No. Product~-
Quantitv !
I Re-Cycled waste oil 600 KLiMonth2 Re-re.fined used oil 600 KLiMonth
De contamination, De toxic and Recyclers /-----_.
3. 8000 Nos.·Month
~ reconditionin!! of emotv barrels (MS & (llasticslL ____ . ____ ~ _
3. CONDITIONS UNDER THE WATER ACT:3.1 The quantity of trade eftluent from the factory shall nol exceed 7600 lits/day. Out of which
treated eftluent partly reused and other treated emuent shall be evaporation Incineration tomaintain zero discharge.
3.2 The quantity of Sewage eftluent trom the factory shall not exceed 800 lit/day.3.3. The directives issued by the Board frol11 time to time in vie\\' of direction issued bv the
Honorable High of Gujarat in the matter of S.C.A.770'95 and any other shall have io becomplies with.
4. CONDITIONS UNDER THE AIR ACT:
4.1 The :~~o:in ;~~::I be used as~ -"'Quantity l1 LDO 20. Iiters!hr
Wood Io.0J<:~~ __ ~_ .....J
4.2 The applicant shall install & operate air pollution control sy'stem in order to achieve normsprescribed below.
I
Clean GujaratGreen GujaratISO - 9001 - 2008 & ISO - 14001 - 2004 Certified Organisation
Annexure 1.3 Work Orders & CCA for Authorised HW recyclers
~,~U'
GPCB
GU]ARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A, Gandhinagar-382 021 .Website: www.gpcb.gov.in
4.2.1 The flue gas emission through stack attached to hoilerlurnaceiheater shall conform to thefollowing standards:
Stack Attached Stack Height InAir Pollution
Permissible IStackControl Parameter
No To Meter Limit IS\'Stem
I. Thermic Fluid --- Particulate Maner 150mgNmHeater
SO, 100 ppm
2.Furnace no. I
--- NO, 50 ppm&2
PM 50 mg/NW
30SO, 200 mg/NWNO, 400 mg/NW
captiveAlkali Scruhher
HCr, 50 mg/NM'3.
Incinerator CL, 09 mg/NM'HF 04 mg/NM'CO 100 mg/NM'
TOC 20 mg/NW4.2.2
5080408060100
Concentration in: Ambient air
Time WeightedAvera e
Annual24 Hours
Annual24 HoursAnnual24 Hours
Sulphur Dioxide (502), fig/m3
Nitrogen Dioxide (N02), fig/m3
Particulate Matter(Size less than 10 fun) OR PM I 0
/m3
Particulate Maner (Size less than 2.5 I ;(",lua-1 --- 40
mm) OR PM 2.5 m3 24 Hours 60
The applicant shall provide portholes, ladder, platform etc at chimney(s) for monitoring theair emissions and the same shall be open for inspection to/and for use of Board's staff. Thechimney(s) vents attached to various sources of emission shall be designed by numbers slichas 5-1, 5-2, etc. and these shall be painted/displayed to faei litate identification.The industry shall take adequate measures for control of noise levels from its own sourceswithin the premises so as to maintain ambient air quality standards in respect of noise to lessthan 75dB(a) during day time and70 dB (A) during night time. Daytime is reckoned inbetween6a.m. andlO p.m. and nighttime is reckoned between 10 p.m. and 6 a.m.The applicant shall provide proper ventilation and exhaust facilities so as to maintain healthyworking atmosphere within the factory premises.
4.
I.
2.
3.
4.4.
4.5
4.3.
55.1
GENERAL CONDITIONS:-
Any change in personnel, equipment or working conditions as mentioned in the consentsform/order should immediately be intimated to this Board.
2
Clean Gujarat Green GujaratISO - 9001 - 2008 & ISO - 14001 - 2004 Certified Organisation
~~,~U
GPCB6.
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A. Gandhinagar-382 021.Website: www.gpcb.gov.in
AUTHORISATION FOR THE MANAGEMENT & HANDLING OF HAZARDOUSWASTES Form-2 (See rule 3 (c) & 5 (5)
Fonn for grant of authorisation for occupier or operator handling hazardous "aste
6.1 Number or authorisation: AWH-61732 Date or issue: 1810412014.
6.1.1 MIS. RELIANCE BARREL SUPPLY CO., is hereby granted an authorisation to operatefacility for following hazardous wastes on the premises situated at PLOT NO: 200/34, B/H.KASHIR TEXTILE MILL,NAROL-DIST,AHMEDABAD.
Sr.No.
I.
4
6
Waste Quantity
ETP Waste 900 KG/Yr
Distillation Residue 1200 KLlYr
Spent clay 180 MTlYearContaining Oil
Filters & Filtering 1200 KGlYrmaterials
Incineration Ash 180 MT/Yr
Discarded Container 24000 Nos./Yr
Oily Sludge 72 KLlYr
Used Oil 600 KLiMonth
Waste Oil 600 KLiMonth
ProcessCate"orv34.3
4.4
4.5
35,1
36.2
33.3
4.1
5.1(Reception)
5.2(Reception)
Facility
Co!lection, Storage,Transporlolion, Disposal af
rSDF approved hy board.Co!lection, Storage.Transportation. Di~posal b)'incineration at CHWIF facilityapproved hy hoard and/or atOl-vn Incineration.Collection. Storage,Trampor/ulion, Dhposa/ byincineration at CHWIF(acili(l'approved by board and/or atown Incineration.('allee/ion, Storage,Transportation, Disposal atrSDF avvroved by board.,
Co!lection, Storage,Transportation, Disposal orrSDF aV{Jl'ovedby board.Coliection, Storage,Decan/amino/;on,Transportation, Disposal bysellin£ /0 aUlhorised recvclerCollection. Storage,Transportation. Disposal hyincineration at CHWIF(acili(l'approved by board and/or atown Incineration..(~()liectio;,-,--- Storage,
Revrocessin£ within oremises
Coliection. Storage,Revrocessin't!,wilhin [Jremises
6.1.2 The authorisation is granted to operate a facility for collection. storage. within Ihe facIOi'!'premises, transportation and ultimate disposal of Hazardous wastes as mentioned above,
3 G .Clean Gujarat Green uJarat
ISO - 9001 - 2008 & ISO - 14001 - 2004 Certified Organisation
GU]ARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-1 a-A, Gandhinagar-382 021.
Website: www.gpcb.gov.in
6.15a)
6.1.3 The authorisation shall be in force for a period of 12/02/2019 trom Ihe date of application.6.1.4 The authorisation is subject to the conditions stated belov·,. and such other conditions as lllay
be specified in the rules from time to time under the Environment (Protection) Act-1986.
TERMS AND CONDITIONS OF AUTHORISATIONThe applicant shall comply with the provisions of the Environment (Protection) Act - In6and the rules made there under.
b) The authorisation shall be produced for inspection at the request of an officer authorized b)the Gujarat Pollution Control Board.
e) The persons authorized shall not rent, lend, selL transfer of othenvisc transport the hazardouswastes without obtaining prior permission of the Gujarat Pollution Control Board.
d) Any unauthorized change in personnel, equipment or working conditions as mentioned in theauthorisation order by the persons authorized shall constitute a breach of this authorisation.
e) It is the duty of the authorised person to take prior permission of the Gujarat Pollution ControlBoard to close down the facility.
I) An application for the renewal of an authorisation shall be made as laid dO\\11 in rule 5 (6) Iii).g) Industry shall have to mange waste, oil, discarded containers etc as per Kulcs 2008.h) Industry shall submit annual report within 15 days and sub sequently by 31" Jmluary ever)
y'ear.
NO: PC/CCA/ABD/NL-119/1D-13367/ '2-'2);) ~::,
Issued to:·~M/S. RELIANCE BARREL SUPPLY CO.,
PLOT NO: 200/34, B/H. KASHIR TEXTILE MILL,NAROL-DIST,AHMEDABAD.
For and on behalf ofClljarat Pollution COlltrol Board
~.%tEnvironmental Engineer
J):\ t> 2.h~ 'ro1~
Copy to:I. The Regional Officer. G.P.C.Soard. Ahmedabad with a request to carry out monitoring
sampling and inspection under the provisions of the Water Act 1974. Air Act. 1981& EP /let1986.
o Unit-I.
ISO - 9001 -
4
Clean Gujarat Green Gujarat
2008 & ISO - 14001 - 2004 Certified Organisation
Req. No: Sale Contract No: 40000376
ESSAR OIL LIMITEDP.O.Box No.24, KHAMBHALIYA, DIST:- JAMNAGAR, PIN - 361 305.Ph: 02833-241444, FAX: 02833-662977TIN GST No. 24100800560. TIN CST No. 24600800560.GSTIN No. 24AAACE0890P1ZF
ESSAR OIL LIMITED (REFINERY DIVISION)
Date: 07.12.2017SCRAP CONTRACT NO: 40000376
BUYER:9999900029M/s.Reliance Barrel Supply Co,200/34 Behind Kashiram Textile Mill, Narol,,,Ahmedabad, ,382405,Gujarat.
GSTIN No: 24ACLPJ1362R1Z7
Validity: 21.12.2017 To 31.12.2018
CONSIGNEE9999900029M/s. Reliance Barrel Supply Co,200/34 Behind Kashiram Textile Mill, Narol,,,Ahmedabad,,382405,Gujarat
TIN: 24075000663 DT. 01.10.2005
Dear Sir,With reference to your offer ref DIRECT OFFER dated and subsequent discussion we had with you we here by issue ourScrap Sale Contract for lifting of above scrap material on "AS IS WHERE IS BASIS" from our site subject to followingterms & conditions.
1.PRICES, TAXES & DUTIES
Sr No. Material Code Item Description Unit Qty. Rate in Rs. Amount(Rs.)10 4001010226 DISCARDED EMPTY DRUM PLASTIC
25LTRHSN:
NOS2,000.000
23.00 46,000.00
CGST@9% 4,140.00
SGST@9% 4,140.00
20 4001010056 EMPTY CONTAMINATED DRUMPLASTIC 200 LTR
HSN: 3923
NOS5,000.000
370.00 1,850,000.00
CGST@9% 166,500.00
SGST@9% 166,500.00
30 4001010086 EMPTY CONTAMINATED DRUMPLASTIC 50 LTR
HSN: 3923
NOS10,000.000
38.00 380,000.00
CGST@9% 34,200.00
SGST@9% 34,200.00
40 4001010096 EMPTY CONTAMINATED DRUM MS200 LTR
HSN: 7310
NOS4,900.000
233.00 1,141,700.00
CGST@9% 102,753.00
SGST@9% 102,753.00
50 4001010106 EMPTY CONTAMIN DRUM PLASTIC35LTR SCRAP
HSN:
NOS10,000.000
32.00 320,000.00
CGST@9% 28,800.00
SGST@9% 28,800.00
60 4002070106 DRUM PAINT TIN SCRAPHSN: 7310
KG18,000.000
2.00 36,000.00
Regd. Office: Khambhalia Post, P.O. Box 24, Dist. Jamnagar, Gujarat - 361 305Tel. 02833 241444, Fax 02833 662977
Page1 of 3
CGST@9% 3,240.00
SGST@9% 3,240.00
70 4001020366 EMPTY CONTAMINATED DRUMPLASTIC 4 LTR
HSN: 3923
KG 200.000 2.00 400.00
CGST@9% 36.00
SGST@9% 36.00
80 4001010076 EMPTY CONTAMINATED DRUMPLASTIC 20 LTR
HSN: 3923
NOS1,000.000
18.00 18,000.00
CGST@9% 1,620.00
SGST@9% 1,620.00
90 4001010036 SCRAP EMPTY MDEA CONTAINERHSN: 7310
NOS 500.000 650.00 325,000.00
CGST@9% 29,250.00
SGST@9% 29,250.00
100 4001010266 EMPTY CONTAMINATED DRUMPLASTIC 100 LTR
HSN: 3923
NOS1,000.000
120.00 120,000.00
CGST@9% 10,800.00
SGST@9% 10,800.00
110 4001010276 EMPTY CONTAMINATED#DRUMPLASTIC 30 LTR
HSN: 3923
NOS2,000.000
28.00 56,000.00
CGST@9% 5,040.00
SGST@9% 5,040.00
120 4001140936 DAMAGED DISCARDED EMPTYDRUMS MS 200L
HSN:
MT 10.000 1,550.00 15,500.00
CGST@9% 1,395.00
SGST@9% 1,395.00
130 4001140946 DAMAGED DISCARD EMPTY DRUMSPLASTIC 200L
HSN:
MT 5.000 1,550.00 7,750.00
CGST@9% 698.00
SGST@9% 698.00
140 4001140956 DAMAGED DISCARD EMPTY DRUMSPLASTIC 50L
HSN:
MT 2.000 1,550.00 3,100.00
CGST@9% 279.00
SGST@9% 279.00
150 4001140966 DAMAGED DISCARDED EMPTYDRUMS < 50 LTR
HSN:
MT 5.000 1,550.00 7,750.00
CGST@9% 698.00
SGST@9% 698.00 Total Basic Value(Rs.)
4,327,200.00 Total value of taxes 778,898.00
TAX COLLECTED SOURCE 51,061.00 Total Value incl. Taxes(Rs.)
5,157,159.00
Regd. Office: Khambhalia Post, P.O. Box 24, Dist. Jamnagar, Gujarat - 361 305Tel. 02833 241444, Fax 02833 662977
Page2 of 3
2.PAYMENTS TERMS
ADVANCE AS PER ATTACHED ANNEXURE
3.SALE ORDER & INVOICES:
[1] FOR SALE ORDER : CONTACT PERSON : MR. VIPUL PANCHAL [M = 9925153654] [2] FOR PAYMENT / REFUND AND INVOICES : CONTACT PERSON : MR. SANJAY MEHTA [ACCOUNTS DEPT] [M = 9925150902]
4.DELIVERY ORDER & GATE PASS:
[1] FOR DELIVERY OF MATERIAL : CONTACT PERSON : MR. JATIN JOSHI [EOL-WAREHOUSE] [M = 9925206221] [2] MR. JOSEPH AUGASTIN [M # 9979891308]
5.Special Terms and Conditions
EOL also reserves the right to Cancel/Terminate/Modify the Contract at any time during the peroid with out assigning any reasonthereof.
You or a person duly authorized by you are requested to sign the duplicate copy of this letter in token of your acceptence to theabove terms & conditions and send it back to us.
For ESSAR OIL LIMITED
AUTHORIZED SIGNATORY
Thanking you,
Yours Sincerely,
Regd. Office: Khambhalia Post, P.O. Box 24, Dist. Jamnagar, Gujarat - 361 305Tel. 02833 241444, Fax 02833 662977
Page3 of 3
Req. No: Sale Contract No: 40000411
NAYARA ENERGY LIMITEDP.O.Box No.24, KHAMBHALIYA, DIST:- JAMNAGAR, PIN - 361 305.Ph: 02833-241444, FAX: 02833-662977TIN GST No. 24100800560. TIN CST No. 24600800560.GSTIN No. 24AAACE0890P1ZF
NAYARA ENERGY LIMITEDFormerly known as Essar Oil Limited
Date: 18.07.2018SCRAP CONTRACT NO: 40000411
BUYER:9999900052M/s.RUBAMIN LIMITED,23, Shree Industrial Estate, Vill. Dunia, Halol, Dist.Panchmahal, Gujarat.,,,HALOL, VADODARA, ,389350,Gujarat.Suresh K.R.GSTIN No:
Validity: 08.08.2018 To 15.09.2018
CONSIGNEE9999900052M/s. RUBAMIN LIMITED,23, Shree Industrial Estate, Vill. Dunia, Halol, Dist.Panchmahal, Gujarat.,,,HALOL, VADODARA,,389350,GujaratSuresh K.R.TIN: 241711100251
Dear Sir,With reference to your offer ref dated and subsequent discussion we had with you we here by issue our Scrap SaleContract for lifting of above scrap material on "AS IS WHERE IS BASIS" from our site subject to following terms &conditions.
1.PRICES, TAXES & DUTIES
Sr No. Material Code Item Description Unit Qty. Rate in Rs. Amount(Rs.)10 4001010176 SPENT NIMO CAT WITH ALUMINA
BALL IN DRUMHSN: 3815 90 00
KG67,000.000
79.00 5,293,000.00
CGST@9% 476,370.00
SGST@9% 476,370.00Total Basic Value(Rs.)
5,293,000.00 Total value of taxes 952,740.00
TAX COLLECTED SOURCE 62,457.00 Total Value incl. Taxes(Rs.)
6,308,197.00
2.PAYMENTS TERMS
ADVANCE AS PER ATTACHED ANNEXURE
3.SALE ORDER & INVOICES:
[1] FOR SALE ORDER : CONTACT PERSON : MR. VIPUL PANCHAL [M = 9925153654] [2] FOR PAYMENT / REFUND AND INVOICES : CONTACT PERSON : MR. SANJAY MEHTA [ACCOUNTS DEPT] [M = 9925150902]
4.DELIVERY ORDER & GATE PASS:
[1] FOR DELIVERY OF MATERIAL : CONTACT PERSON : MR. JATIN JOSHI [EOL-WAREHOUSE] [M = 9925206221]
Regd. Office: Khambhalia Post, P.O. Box 24, Dist. Jamnagar, Gujarat - 361 305Tel. 02833 241444, Fax 02833 662977
Page1 of *
All obligations/liabilities incurred prior to and which by their nature would continue beyond termination or expiration of this Order shall survive such termination or expiration.
<H>AMENDMENTS :</> Amendments, modifications or supplements to this order as agreed by the parties shall be effective only if made in writing and signed by authorized signatory/representative of the parties.
<H>JURISDICTION :</> All disputes arises relating to this Contract, if any, will be deemed to have arisen within the jurisdiction of the court at Jamnagar, Gujarat State.
<H>FORCE MAJEURE :</> Acts of Gods like floods, earthquakes and other occurrences such as war, riots etc., totally beyond the control of nayara energy/or BUYER shall only be considered as force majeure conditions.
Nayara Energy limited also reserves the right to Cancel/Terminate/Modify the Contract at any time during the peroid with outassigning any reason thereof.
You or a person duly authorized by you are requested to sign the duplicate copy of this letter in token of your acceptence to theabove terms & conditions and send it back to us.
For NAYARA ENERGY LIMITED
AUTHORIZED SIGNATORY
Thanking you,
Yours Sincerely,
Regd. Office: Khambhalia Post, P.O. Box 24, Dist. Jamnagar, Gujarat - 361 305Tel. 02833 241444, Fax 02833 662977
Page10 of 10
Sr Quantity Hazardous Waste Type1 11.030 5.1 - Used or Spent Oil
1
Registration No: AWH 81987 till 16.09.2022
Transporter's Name & Address : 2 Reliance Barrels Supply Co., AHMEDABAD Ph: 9824090021
Transporter's Registration No : 3 AWH61732 valid till 12.02.2019
Vehicle No & Type : 4 GJ27U0777 - EICHER TEMPO
Waste Description & Codes :
Total Quantity :
Consistency :
Waste Description :
8
9
10
11
5.111.030 Metric Tonne
Semi-SolidUSED OIL
Designated Facility Name & Site Add:
Facility's Reg No with PCB :
Waste Type :
5
6
7
IND:Reliance Barrel Supply Company
PLOT NO:S.NO. 62-66......,JAMNAGAR-OKHA HIGHWAY(SH-25), PO BOX NO:24,VILL: VADINAR - 361305DIST : Devbhoomi Dwarka, TAL : Khambhalia , GIDC : Not In Gidc
27398 - Essar Oil Ltd. (Refinery Division)
Containers: 60
Occupier's Name & Mailing Address:
Signature
Occupier's Certificate : I hereby declare that the contents of the consignment are fully and accurately decribed above by proper shipping name and are categorised, packed, marked, and labeled, and are in all respects in proper condition for transport by road according to applicable national government regulations.
12
Name & Stamp of Industry Signature
13 Transporter Acknowledgement of Receipt of Wastes
Stamp of: Signature
14 Discrepancy Note Space
15 Facility Owner or Operator's Certification of Receipt of Hazardous Waste
Stamp of:
IND:Reliance Barrel Supply Company( Hazardous Waste Manifest )
To be forwarded by the occupier to the State Pollution Control Board or Committee.
11/05/2018
Manifest No: 703863
Copy 1
Date :
Date:
Date :
-
11/05/2018
Reliance Barrels Supply Co. 11/05/2018 0:00
IND:Reliance Barrel Supply Company
Recylable Waste
N I C1 ( Through XGN )29/09/2018
Annexure 1.4 Manifest copies for HW disposed to authorised recyclers
Sr Quantity Hazardous Waste Type1 24.220 4.2 - Spent Catalyst
1
Registration No: AWH81987 VALID TILL 16/09/2022
Transporter's Name & Address : 2 Saurashtra Trasport, PANOLI Ph: 7622002232
Transporter's Registration No : 3 -
Vehicle No & Type : 4 GJ37T8651 - TRUCK
Waste Description & Codes :
Total Quantity :
Consistency :
Waste Description :
8
9
10
11
4.224.220 Metric Tonne
SolidSPENT NI-CO-MO CATALYST WITH CERAMIC BALLS
Designated Facility Name & Site Add:
Facility's Reg No with PCB :
Waste Type :
5
6
7
IND:REFRACAST METALLURGICALS PVT LTD
PLOT NO:S.NO. 62-66......,JAMNAGAR-OKHA HIGHWAY(SH-25), PO BOX NO:24,VILL: VADINAR - 361305DIST : Devbhoomi Dwarka, TAL : Khambhalia , GIDC : Not In Gidc
27398 - Essar Oil Ltd. (Refinery Division)
Containers: 145
Occupier's Name & Mailing Address:
Signature
Occupier's Certificate : I hereby declare that the contents of the consignment are fully and accurately decribed above by proper shipping name and are categorised, packed, marked, and labeled, and are in all respects in proper condition for transport by road according to applicable national government regulations.
12
Name & Stamp of Industry Signature
13 Transporter Acknowledgement of Receipt of Wastes
Stamp of: Signature
14 Discrepancy Note Space
15 Facility Owner or Operator's Certification of Receipt of Hazardous Waste
Stamp of:
IND:REFRACAST METALLURGICALS PVT LTD( Hazardous Waste Manifest )
To be forwarded by the occupier to the State Pollution Control Board or Committee.
16/04/2018
Manifest No: 691202
Copy 1
Date :
Date:
Date :
-
16/04/2018
Saurashtra Trasport 16/04/2018 0:00
IND:REFRACAST METALLURGICALS PVT LTD
Recylable Waste
N I C1 ( Through XGN )16/04/2018
Sr Quantity Hazardous Waste Type1 14.810 4.2 - Spent Catalyst
1
Registration No: AWH81987 VALID TILL 16/09/2022
Transporter's Name & Address : 2 Ambica Transport Services, Narol, A'BAD. Ph: 9824017404
Transporter's Registration No : 3 APPLIDE
Vehicle No & Type : 4 GJ12AU8579 - TRUCK
Waste Description & Codes :
Total Quantity :
Consistency :
Waste Description :
8
9
10
11
4.214.810 Metric Tonne
SolidSPENT NI-MO CATALYST WITH ALUMINA BALLS
Designated Facility Name & Site Add:
Facility's Reg No with PCB :
Waste Type :
5
6
7
IND:RUBAMIN LIMITED
PLOT NO:S.NO. 62-66......,JAMNAGAR-OKHA HIGHWAY(SH-25), PO BOX NO:24,VILL: VADINAR - 361305DIST : Devbhoomi Dwarka, TAL : Khambhalia , GIDC : Not In Gidc
27398 - Essar Oil Ltd. (Refinery Division)
Containers: 88
Occupier's Name & Mailing Address:
Signature
Occupier's Certificate : I hereby declare that the contents of the consignment are fully and accurately decribed above by proper shipping name and are categorised, packed, marked, and labeled, and are in all respects in proper condition for transport by road according to applicable national government regulations.
12
Name & Stamp of Industry Signature
13 Transporter Acknowledgement of Receipt of Wastes
Stamp of: Signature
14 Discrepancy Note Space
15 Facility Owner or Operator's Certification of Receipt of Hazardous Waste
Stamp of:
IND:RUBAMIN LIMITED( Hazardous Waste Manifest )
To be forwarded by the occupier to the State Pollution Control Board or Committee.
29/08/2018
Manifest No: 746520
Copy 1
Date :
Date:
Date :
-
29/08/2018
Ambica Transport Services 29/08/2018 0:00
IND:RUBAMIN LIMITED
Recylable Waste
N I C1 ( Through XGN )29/09/2018
Sr Quantity Hazardous Waste Type1 14.680 4.2 - Spent Catalyst
1
Registration No: AWH81987 VALID TILL 16/09/2022
Transporter's Name & Address : 2 Self, Surendranagar Ph: 7984396487
Transporter's Registration No : 3 SELF
Vehicle No & Type : 4 GJ12Y9806 - TRUCK
Waste Description & Codes :
Total Quantity :
Consistency :
Waste Description :
8
9
10
11
4.214.680 Metric Tonne
SolidSPENT ZnO CATALYST
Designated Facility Name & Site Add:
Facility's Reg No with PCB :
Waste Type :
5
6
7
IND:BRAVO AGROTECH
PLOT NO:S.NO. 62-66......,JAMNAGAR-OKHA HIGHWAY(SH-25), PO BOX NO:24,VILL: VADINAR - 361305DIST : Devbhoomi Dwarka, TAL : Khambhalia , GIDC : Not In Gidc
27398 - Essar Oil Ltd. (Refinery Division)
Containers: 50
Occupier's Name & Mailing Address:
Signature
Occupier's Certificate : I hereby declare that the contents of the consignment are fully and accurately decribed above by proper shipping name and are categorised, packed, marked, and labeled, and are in all respects in proper condition for transport by road according to applicable national government regulations.
12
Name & Stamp of Industry Signature
13 Transporter Acknowledgement of Receipt of Wastes
Stamp of: Signature
14 Discrepancy Note Space
15 Facility Owner or Operator's Certification of Receipt of Hazardous Waste
Stamp of:
IND:BRAVO AGROTECH( Hazardous Waste Manifest )
To be forwarded by the occupier to the State Pollution Control Board or Committee.
04/06/2018
Manifest No: 716117
Copy 1
Date :
Date:
Date :
-
04/06/2018
Self 04/06/2018 0:00
IND:BRAVO AGROTECH
Recylable Waste
N I C1 ( Through XGN )04/06/2018
I
I "~ 7 "I ~ nw c CJj , rrf17Tj'{
ITelegram 'EXPLOSIVES', NagpurWebs1(e d.!l1 { I' nu. 1
Email: pi .1\1,." .;.!..~~;~n.!9:-1_\". .J(l~, III
~'IfJf{/ Telephone: 0712-2510248
fiRF:f;/ rAX: 2510577
Cf17lffC141'1 Jtrq -$ ?1'ft
..,..",..,A- ''=f'1t' ~"4-'(";fUG ::I""" /qi(:q>/C;C/i 1'74";fC(} C(}
~ r} # ~ I:Ff$ rzrfiirrrrff7f11Y17lft1
All communications intendedfor this Office should be addressedto the 'Chief Con (roller ofExplosives' and NOT to hrm by
~~GOVl~RNMENTOF INDIA
tt~~~~eR:tI'l'1~=+1m.rr fct'Nl~cij)~m ~Petroleum and Explosives Safety Organisation
(jcf 7f11- f4i(:q>]c CJj fiNrTT)(Formerly- Department of Explosives)
"~" ~, ~ (ffi', ~ ~ qftm,"An Block. 5th Floor, CGO Complex,
Wft;rtt~, ~-440 006 (lfflJ.)Seminary Hills, Nagpur- 440006
~/No. P-5(2) 150IRefinery/IV/Expansion
~ ~ /Nagpur, dated 30110,2008.
To, '.Mis. Essar Oil Limited,P.O. Box No. 24, Head P.O. Khambhalia,Distt. Jamnagar 361 305 (Guj.).
Sub: Expansion of existing refinery capacity from 10.50 MMTPA to 34 MMTPA approval 0[.
Deer Sirs,
Reference your letter No. EOLIRefinery-Expn.lPhl & Ph2/2008 dated 07108/2008.
Overall key plan No. 0010011R-00, overall plot plan No. 0010081R-OB and overall plot plan forCOT area tankages bearing no. OOlOOllR-A submitted with your letter under reference showing theexpansion of existing refinery capacity to 34 MMTPA meets with the approval of this office with thefollowing conditions :-
1) A separate approval for laying of pipelings from Jetty to COT area and COT Area to refineryshould be taken on finalisation of detailed engineering and approval of 2nd SBM.All existing and operating process units and storage tanks of petroleum shall be dulyseparated from construction activity of incoming process units by providing screenwalls/barricading and gas free permit systems as per OISD 105 standard shall be strictlyobserved.All proposed floating roof tanks (8 Nos.) each of 120000 KL of COT .Areashal1 be providedlinear heat detection system for rim-seal fire on permitting height of dyke upto 2.75 meters asdesired and accepted under provision clause of condition 3(i) of licence in form XV.
2)
3)
A copy each of the drawing duly approved is forwarded herewith.Yo
( Ajai Nigan )Chief Controller ofExplosi es
Copy to :-
1) The Jt. Chief Controller of Explosives, West Circle, Mumbai.
2) The Dy. Chief Controller of Explosives, Baroda.
Chief Controller of Explosives
208
-
·.
t i
"Il
::u~!
ll III -< 0
~»
e~
(I)
om
%....
m~
m ~
~"I
l'"~
"'0
C>1l
l -<0 -n
§~ ~~
::u"'0
;00 ."
m (I) E Q r C I: =l m o
--I- ::u
"'0 ::uo ."
o
..
i>I
!... 0
•0 ill~, t
:II
It
_•
I~
c"
o•!
:::jz
;0r-
c:Z
r-:::
j0
iiim
'-z
•Im o
~....
;-
....
....
z •"'0
n0
-< I~~
lIIO ~~
,....c
,,!j;
I~
::!1
'11
0 z I'll ... 0 III
0 0
f-----
-o0 m
~"." ."
c:;0
~0 < ,.
Zr
Z c: II:
(')
CD
~m )I
lI/
)
01 '" '"... o ;;: '" ~ '"
)Il
fm <
I/) X m !!l o ."
o ~ m
.,
!>
IIs
•i,I o, t
21
it_ ~
!I-i
c:"
o••
3z
;ur-
i=i
0iii
c:m
t..
•I:
mz
o-i
•!
-i
!!:z • n ! II
l-n ,. s c S 0 z z c E
nCD
1!m ::a
<II .. 0 s: n ;: 0 s 0
1II
0 •m < ~ CD -< ~
<II
[nl:r m m -i w
i CD -<0 ."
~ -i m
.. ..
\
<II ::I:
m m ...
i i
'z I::!0
(lO'
(I) ~ ts <0. "'
Xx:
J: "'- 0"'" II
:
...-
-iii
I-
~ o "'."'X x:J: ~~ II
:
g~~2~
t-':-"'
!"~
~X
~o
~~.C
lIoN
N1
CQ
)0
~0
..........
0S;
!II:
U>U
>X
0m
..i:
~"
u._
:II
'Tl0
::00
."
(I)
..z o 1-
<..0
'"r
oC
.II:
§!" ~ ::0
'Tl0
::00
."
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 1 of 14
Date : 27.08.2018
Plant /Unit : FCCU
Location : Main Fractionator Column Area
Equipment : HCO Pump Around Pump 35 P 104 S
Scenario:-
Large leakage hot HCO from pump discharge immediate flange of HCO Pump Around Pump 35 P 104 S above auto ignition temperature of the fluid.
The first isolation valve MOV # 35 HZV 152 got stuck up and could be closed only about 90 %.
Subsequently, it catches fire as it is operating above AIT resulting in jet fire of about 25 mtrs. height flame is seen.
Process Conditions Temp- 320-330 ºC , Pressure – 9.0 – 10.0 Kg/Cm² , Flow – 450 M3 /Hr , Density – 950 Kg/ m3
Hold up volume - 100.0 m3 , Auto Ignition Temp- 260 ºC
Hold up that will leak before suitable action is taken (20 Min) – 0.5 m3
Composition - Heavy Cycle Oil
Casualty -01 One contract workmen who was working nearby got engulfed in the jet fire ,got major burn injuries, and collapsed on the ground.
Time of Initiation : 15:13:00 Hrs. Time of Alarm : 15:13:45 Hrs
Time of “All Clear” : 15:29:32 Hrs. Total Duration of Drill: 16 Min 32 Sec
Observers
S.N. Observer's location Name 1 Emergency Site - Site Incident Controller (SIC) Shri Mahesh Savaliya ,Head– Safety
2 Emergency Site- Operations & Maintenance Shri Krishnakumar S.,GM – Process
Annexure 1.7 Mock Drill
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 2 of 14
3 Refinery Fire Control Room Shri Sanjiv Kumar , JGM- Instrumentation
4 CCB Control Room-DCS -Panel Shri Vinod Sagar , DGM – Operations , DHDT 5 Emergency Site – Security / Medical Services Shri Amitrajit Sengupta ,JGM- HR 6 Emergency Site – Fire Services Shri Ramkrishna Paramhans ,JGM– Mechanical 7 Mock Drill – Co-Ordinator Shri Himanshu S. Mishra , DGM –HSEF
Emergency Management Team
Site Incident Controller : Shri Madhusudhan C., GM-Ops. & A M –NHT/CCR/CDU2
Refinery Shift Manager : Shri Rahul Wani
Area Manager : 1. Shri Nelakanthi Murthy , Area Manager
2. Shri Dipesh Modi , JGM- Operations 3.Albert S.–JGM -Operations
Shift –In-Charge (Operation) : 1. Shri Ramesh Chaudhary
Maintenance Manager : 1. Shri Rajnish Verma , Mechanical 2. Shri Chintan Patel – Mech
3. Shri Chinna Pillai , Instruments 4. Shri Anand Vijay Kumar , Electrical
Fire Officer : 1.Shri Ankit R. Kapupara,
Security Officer : 1. Shri Ramesh Bhonsle
Panel Officer : 1. Shri Rajnikant Patel 2. Shri Ranmal Modvadia
Field Engineer : 1. Shri Nikhil Chauhan , Main Fractionation Area
2.Shri Antu Savalia , RR Area , 3. Shri Nirmal Patel , MAB
4. Shri Pravin Kumar , Gascon -1 Area 5.Shri Ashwin Kumar – Gascon 2
Admin Co-ordinator :- 1. Major (Retd) Vikram Sinha
Auxiliary Fire Squad :- Shri Arpan Shah- Lab
Trained First Aider :- Shri Rahul Rakholiya –Lab
Injury, if any: - : 01 (Contract Workman)
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 3 of 14
Mock Drill Chronology
Time Actions 15:13:45 Hrs
Flame detector # 34 AT 311 got activated. Panel Officer Rajnikant Patel alerted Field Officer Shri Nikhil Chauhan, MF Area.
15:13:45 Hrs
MCP 34 HS 208 was activated by Shri Nikhil Chauhan , Field Officer, hooter and beacon activated, fire alarm received at FCCU Panel and the same got repeated at Refinery Fire Station.
15:13:45 Hrs Shri Rajnikant Patel , Panel Officer ,FCCU , informed fire control room about “ Large leakage and Fire in hot HCO from pump discharge immediate flange of HCO Pump Around Pump 35 P 104 S in MF Area.”on emergency number 1111.
15:13:45 Hrs
Shri Ranmal Modvadia ,Panel Officer, FCCU made announcement in Hindi / English/Gujarati “Large leakage of hot HCO from pump discharge immediate flange of HCO Pump Around Pump 35 P 104 S in MF Area , stop all jobs and evacuate .”
15:14:00 Hrs
Evacuation of all non - essential personnel from FCCU started. All occupants evacuated to Safe Assembly Point within two minutes.
15:14:00 Hrs Throughput for FCCU was decreased by Panel Officer. 15:14:00 Hrs HCO Pump around Pump 35 P 104 S stopped and isolated. 15:14:00 Hrs Feed to FCCU was stopped and safe shut down of the unit was taken. 15:14:02 Hrs
Foam Tender FT-04 with crew followed by Ambulance and Shift Fire Officer Shri Ankit R. Kapupara in Fire Jeep J6 ,turned out from Refinery Fire Station.
15:14:02 Hrs
Simultaneously, Dry Chemical Powder (DCPT-01) with crew turned out from Auxiliary Fire Station, CPP.
15:14:59 Hrs Foam Tender FT-02 with crew followed by Ambulance and Shift Fire Officer Shri Ankit R.Kapupara in Fire Jeep J6 arrived at incident site from Refinery Fire Station.
15:15:00 Hrs Water Spray System DV # 14 for hot pump area was operated by Shri Ranmal Modvadia ,Panel Officer from DCS.
15:15:00 Hrs
Shri Ramesh Chaudhary ,Shift In Charge - Operations arrived at incident site and took control of the situation.
15:15:00 Hrs The first isolation valve MOV # 35 HZV 152 was closed by the Panel Officer , but it got stuck up and could be closed only about 90 %.
15:15:00 Hrs
One contract worker- helper who was working nearby, got engulfed in jet fire, got severe burn injury and collapsed on the ground. He was spotted in MF Area and was shifted to a safe area by Mr. Antu Savalia and Mr. Albert S.
15:15:00 Hrs
Fire Crew donning SCBA sets and single layer inherent fire resistant (IFR) Nomex Suits carried out search and rescue.
15:15:00 Hrs Foam application by Foam Tender, over jet fire, by Fire Crew started . 15:15:00 Hrs
Security – Patrolling officer Shri Ramesh Bhonsle with QRT team -08 guards arrived at the incident site. Cordoned and evacuated the area. Regulated traffic.
15:15:10 Hrs Dynamic Blast Call (Group 4) – phone activated by Fire Control Room operator to
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 4 of 14
inform all primary responders. 15:15:50 Hrs
DCP Tender DCPT-01 with crew arrived at incident site from Auxiliary Fire Station- CPP and took position on south side of FCCU.
15:16:00 Hrs
Shri Rahul Wani , Refinery Shift Manager (RSM), arrived at incident site and supported the Site Incident Controller (SIC).
15:17:28 Hrs
Dynamic Blast Call (Group 1) – phone activated by Fire Control Room operator to inform all primary responders.
15:18:00 Hrs The casualty was shifted to OHC by Ambulance and was accompanied by an employee.
15:19:00 Hrs Incident Site Area was effectively barricaded by Operations team. 15:20:00 Hrs One DCP 9 Kgs Stored Pressure type fire extinguisher was operated by Shri Nikhil
Chauhan, Field Officer. 15:20:00 Hrs
Shri Nelakanti Murthy , Area Manager – FCCU arrived at incident site and took control of the situation.
15:20:00 Hrs Shri Madhusudhan C. , GM – Operations and Area Manager – NHT/CCR /CDU-2 arrived the incident site and took charge as Site Incident Controller (SIC).
15:20:00 Hrs Mechanical Maintenance Team with Shri Chintan Patel , Rajnish Verma along with Riggers -02 and Supervisor -01 arrived at incident Site with flame proof tool kit.
15:20:00 Hrs Instrument Maintenance Team with Shri C. Pillai along with one Instrument Technician arrived at incident Site with tool kit.
15:20:00 Hrs Electrical Maintenance Team with Shri Anand Vijaykumar along with one Electrical Technician arrived at incident Site with tool kit.
15:22:00 Hrs
Shri Dipesh Modi , JGM-Operations arrived at incident site and took control of the situation.
15:22:00 Hrs
Auxiliary Fire Squad - Shri Arpan Shah- Lab and Trained First Aider Shri Rahul Rakholiya –Lab, arrived at incident site and reported to Shift Fire Officer. Later they helped in emergency handling.
15:23:00 Hrs MOV # 35 HZV 152 was isolated with the help of Maintenance Team. 15:24:00 Hrs Second Ambulance arrived at Incident Site. 15:25:00 Hrs Site Incident Controller took feedback about the injured person from OHC. 15:26:00 Hrs Fire under control. Water spray application continued for structural cooling. 15:26:00 Hrs Fire crew searched the area once again for any more casualty. 15:28:00 Hrs Head Count report given by Security Officer Shri Ramesh Bhonsle – at Assembly
Point and incident site – Contract workmen- 40 , Employees – 16 , Casualty -01(Contract Workman ) ,Visitor – Nil , Total- 57 personnel.
15:28:32 Hrs Fire extinguished completely. 15:29:00 Hrs LEL checked by Fire Crew and Operations team as well – Nil. 15:29:32 Hrs All Clear – declared by Shri T.Chandrashekhar Site Incident Controller (SIC) 15:30:00 Hrs Knock Off and make up ordered for Fire Crew. 15:33:42 Hrs Dynamic Blast Call (All Clear ) – phone activated by Fire Control Room operator to
inform all key personnel. It worked well.
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 5 of 14
15:45:00 Hrs Debriefing Session was held at FCCU Check & Change Room Pantry. 24 employees participated.
Head Count
Personnel Reported for Duty on the day / shift
Actual head count at incident site
Head count Safe Assembly
Points
Total head count
Employees 16 10 06 16 Contract Workmen 41 05 35 40 Casualty / Injured Nil 01 Nil 01 Visitors Nil Nil Nil Nil Total 57 16 41 57
41
16
0
0
57
40
16
1
0
57
0 10 20 30 40 50 60
CONTRACT WORKMEN
EMPLOYEES
Casualty / Injured
VISITORS
TOTAL
HEAD COUNT TALLY - FCCU - 27.08.2018
Actual head count during incident Present on date
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 6 of 14
Evaluation Sheet # 1
Location :- Refinery Fire Station Control Room
Observer :-– Shri Sanjiv Kumar , JGM - Instrumentation
The observers assessment was based on the following Actions Events
Fire Control Room Events Time & Date of call : 15:13:45 Hrs on 27.08.2018 Mode of call ( Incident Information received ) :- MCP/Gas Detector/ Toxic gas detector/Heat/Smoke
Flame Detector – 34 AT 1311 MCP # 34 HS 208
Telephone / Hotline/ Landline/ CUG/wireless/Messenger/
From 1711 to 1111
Record Name of Caller: Shri Rajnikant Patel , PO-FCCU Information to :- (All below information to be conveyed within 3 minutes time.) Information to Yes / No Marks (max) Evaluation Remarks
Shift Fire Officer Yes 1 1 Turnout crew / Turn out bell Yes 2 2 Dynamic Blast Call – (Primary Responders/Secondary Responders & Key Personnel as per level of Emergency ; All Clear) First Turn Out – Group 4 Yes 4.5 4.5
Level1 Yes 5 5
Level2 ------ ------ ------ Not required L1
All Clear Yes 2 2
Panel Officer of affected unit Yes 1 1 In case of failure of Dynamic Blast Call Inform all key personnel of Group-4 as per Dynamic Call Blast annexure. ------ ------ ------ Not required
Inform affected Plant/Unit Panel Officer to communicate all key personnel of Operations & Maintenance for help.
------ ------ ------ Not required
Inform Head – Laboratory to mobilise Auxiliary Fire Squad and Trained First Aiders ------ ------ ------ Not required
In case of declaration of level 2 and higher emergency level Emergency Siren actuation ( As per direction of SFO)
Level 2 Level 3 All Clear ------ ------ ------ Not required L1
Mutual Aid Members ( As per direction of SFO) ------ ------ ------ Not required L1
Total- 15.5 15.5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 7 of 14
Evaluation Sheet # 2
Location :- Respective Plant / Unit Process Central Control Building (CCB)
Observer :-– Shri Vinod Sagar , DGM – Operations (DHDT)
Respective Plant / Unit Process CCB Control Room Events Events Time & date of call 15:13:45 Hrs on 27.08.2018 Mode of call ( Incident Information received ) :- MCP/Gas Detector/ Toxic gas detector/Smoke detector
Flame Detector – 34 AT 1311 MCP # 34 HS 208
Telephone: Landline/ CUG/wireless/In person
Walkie Talkie
Record Name of Caller from whom information received :
Shri Nikhil Chauhan , Field Officer , MF Area
Information to :- (All below information to be conveyed within 3 minutes time.)
Information to Yes / No Marks (max) Evaluation Remarks Shift In Charge - Operation Yes 1 1
Refinery Fire Station ( Hot Line / Ext -1111) Yes 2 2 Announcement on PA system in three languages ( Hindi, English, Gujarati ) for stopping all the jobs & evacuation
Yes 1 1
Area Manager Yes 1 1 WWTF ( Utility ) Yes 1 1 Emergency Control Actions :- Execution of Emergency Control actions on DCS.
Yes 2 2
Information to upstream / downstream / neighboring units / other stake holders Yes 1 1
Announcement on PA system in three languages ( Hindi, English, Gujarati )- All Clear
Yes 1 1
Total- 10 10
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 8 of 14
Evaluation Sheet # 3
Location :- Incident Site – FCCU
Observer :-– Shri Krishnakumar S., GM – Process
Actions by Operations team at Incident Site Events Yes / No Marks (max) Evaluation Remarks Call Initiation – MCP / Emergency No. Yes 2 2
Sounding of Local Siren / Hooter Yes 1 1 Alert other people around in nearby units/ facilities – as per emergency conditions Yes 1 1
Stop Hot /cold jobs Yes 1 1
Casualty search and initial handling by operation team /AFS Yes 1 0.5
Casualty handling not proper
Equipment isolation, valve closing as per SOPs Yes 2 2
DCS control, instruction issued to Field Yes 1 1 Fire & Gas detection system available & their performance Yes 2 2
Fire Extinguishers available & used. Their performance Yes 2 2
DCP-09 Kgs -01 Operated.
Hydrant/Monitor used and their performance Yes 2 2
Deluge System (DV) / Water spray and their performance Ok 4 4
Tower mounted Elevated Long Range Monitor and its performance Ok 4 4
Did not operate as per site evaluation
Assemble at Safe Assembly Point. Yes 1 1
Direction to Fire Services / Emergency Responders and necessary information Yes 1 0
Fire Crew was not directed towards casualty.
SCBA set / BA Trolleys used & their performance Yes 1 1
Environment related actions – Information to WWTF / Environment Yes 1 1
Communication by Shift Incharge - Operations to all concerned as per Incident Communication Protocol – RSM , SFO
Yes 1 1
Communication by Area manager to all concerned as per Incident Communication Protocol- Head – ISBL, Head- EPS , Lead – Maintenance- Mech,Elect, Inst,Civil
Yes 2 1
PPE's Helmet/Safety shoes/ gloves/ goggles / Earplugs Yes 1 1
Total 31 29.5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 9 of 14
Evaluation Sheet # 3A
Location :- Incident Site – FCCU
Observer :-– Shri Krishnakumar S., GM – Process
Actions of Maintenance Team at Incident Site
Timely response of Maintenance Team with tools & tackles & manpower(Max- 8 Min for Base Refinery, 12 Minutes for Train -1 units and off sites , 20 Minutes for COT)
06 Min 15 Sec
2 2
Use of proper tools & tackles – flame proof / precautions/ PPEs as per TBRA Yes 2 2
Mechanical Maintenance Team with flame proof /Adequate Tool Kit and Manpower Yes 2 2
Two Engineers Sup-01 Riggers-02
Electrical Maintenance Team with flame proof /Adequate Tool Kit and Manpower Yes 2 2 One Engineer
One Technician Instruments Maintenance Team with flame proof /Adequate Tool Kit and Manpower Yes 2 2 One Engineer
One Technician Civil Maintenance Team with flame proof /Adequate Tool Kit and Manpower No NR NR Not required as per
site evaluation Inspection Team with adequate tool kit / manpower
No NR NR Not required as per site evaluation
Special PPE's – HR Suits , SCBA sets , BA Trolley Yes 2 2
TOTAL 12 12
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 10 of 14
Evaluation Sheet # 4
Location :- Incident Site – FCCU , Observer :-– Shri Mahesh Savalia ,Head- Safety
Actions by SITE INCIDENT CONTROLLER (SIC) Events Yes / No Marks (max) Evaluation Remarks Response Time (Max- 4 Min for Base Refinery, 6 Minutes for Train -1 units and off sites/VPCL, 20 Minutes for COT)
02 Minutes 15 Sec 3 3
RSM – 02 min 15 Sec SIC – 06 Min 15 Sec
Co-Ordination with Emergency Responders :- Fire Coordinator – Fire & rescue operations , Special Services
Yes 2 2
Security & Evacuation Co-Ordinator : Head Count / Traffic Control / Mob Control Yes 2 2
Medical Team- Casualty shifting and handling at OHC , further actions Yes 2 2
Emergency Support Co-Ordinator – Mobilisation of Auxiliary Fire Squad(AFS) ,Trained First Aiders (TFA)
Yes 1 1 AFS -01 TFA-01
Unit /Plant Operations – Fuel / Energy/Toxic isolation, Safe Shut Down, Emergency Control Actions / Environment related actions.
Yes 4 4
Maintenance Team – Leak Sealing, Insulation removal , Power Isolation , Heavy Equipment Mobilization, Lighting, Dewatering , hot bolting etc.
Yes 2 2
Utility Team – Fire Pump Operation , Hydrant System Pressure , Water Make Up , Steam , Nitrogen , Plant Air etc.
Yes 1 0 Did not communicate
Incident Command & Control :- Sizing up the situation – Overall effective emergency response & control actions Yes 3 3
Communication - with Fire /Security/Operation / Maintenance Yes 3 3
Overall Incident Command and control skill Yes 3 3
Declaration of "All Clear" (in consultation with other Emergency Responders & CIC , after final Search & Rescue , LEL / Toxic Gas Check.)
Yes 1 1
Jacket & PPE's including SCBA / Escape set (ELSA) Yes 1 1
Communication :- Communication by Refinery Shift Manager as per Incident Communication Protocol – Head- Operations/Head –Technical Services/Head-HSEF/Head-Maintenance/Head- CPP &U.
Yes 2 2
Communication by Site Incident Controller as per Incident Communication Protocol – Head- Technical
Yes 1 1 Debriefing at Safe Assembly Point -of all employees, Contract Workmen and Visitors
Yes 2 0 Did not communicate
Total- 33 30
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 11 of 14
Evaluation Sheet # 5 Location :- Incident Site – FCCU
Observer :-– Shri Ramkrishna Paramhans , JGM - Mechanical
Actions by FIRE CREW
Events Yes / No Marks (max) Evaluation Remarks
Response Time (Max- 3 Min for Base Refinery, 6 Minutes for Train -1 units and off sites , 20 Minutes for COT from RFS)
01 Minutes
14 Seconds 3 3
FT-02 DCPT-01 J6
Proper approach and Parking of Fire tender Yes 1 1
Utilization of Auxiliary Fire Squad & Trained First Aiders Yes 2 2
Fire Extinguishing Media application & its effectiveness Yes 2 2
Search and Rescue Yes 3 2 The casualty was left unattended for some time.
Help to Operations / Maintenance personnel for closing /opening the valves for isolation etc.
Yes 1 1
Command & Control of the Fire crew and fire-fighting/ Emergency operations
Yes 2 1 Needs improvement
Method and speed of Action Yes 2 2
Co-ordination with SIC/ Shift In Charge /RSM by Fire coordinator. Yes 1 1
Feedback by Fire Coordinator to Refinery Fire Control room. Yes 1
1
Fire Fighter appropriate PPE's used - Fire Suits / Chemical Suits / SCBA / Gum Boot etc.
Yes 4 4
Mobilisation of additional resources – Fire Tenders , Manpower , Special equipments , SCBA sets , Trailer Mounted HVLRMS etc.
Yes
5 5
27 25
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 12 of 14
Evaluation Sheet # 6
Location :- Incident Site – FCCU
Observer :-– Shri Amitrajit Sengupta , JGM – HR
Actions by Security team
Events Yes / No Marks (max) Evaluation Remarks
Response Time (Max- 6 Min for Base Refinery, 10 Minutes for Train -1 units and off sites/ VPCL , 20 Minutes for COT from Refinery)
01 Minutes 15
Sec 2 2
Road Clearing/Barriers clearing. Yes 0.5 0.5
Proper approach, cordoning off area Yes 1 1
Report to SIC/RSM/Shift- In-Charge -Operation Yes 0.5 0.5
Facilitate Evacuation of Non- Essential Personnel Yes 1 1
Head count Done 2 2
Traffic Control at entry and exit points Yes 1 1
Removal of unwanted vehicles Yes 0.5 0.5 Help in Controlling Emergency Yes 0.5 0.5
PPE's Helmet/Safety shoes/gloves/goggles/Earplugs /SCBA etc
Yes 1 1
Total- 10 10
Actions by OHC - Medical team Response Time (Max- 3 Min for Base Refinery, 6 Minutes for Train -1 units and off sites/VPCL , 20 Minutes for COT )
01 Minutes 14
Seconds 1 1
Parking Ok 1 1 Casualty Shifting Ok 2 2 Mobilizing other Ambulances and treatment at OHC Ok 1 1
Total- 5 5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 13 of 14
Emergency Responders Performance Rating
Sr. No. Emergency Responder
Marks obtained Full Marks
Marks obtained %
Rating
1 FIRE SERVICES 40.5 42.5 95.29% Excellent
2 OPERATION 39.5 41 96.34% Excellent
3 MAINTENANCE 12 12 100.00% Excellent
4 OCCUPATIONAL HEALTH SERVICES
5 5 100.00% Excellent
5 SECURITY 10 10 100.00% Excellent
6 SITE INCIDENT CONTROLLER (SIC)
30 33 90.91% Very Good
TOTAL 137 143.5 95.47 %
Overall Rating 95.47 % EXCELLENT
Rating Criteria 95 to 100 % Excellent 75 to 84.99 % Good Less Than 70% Needs improvement 85 to 94.99 % Very Good 70 to 74.99 % Average
95.29%96.34%
100.00% 100.00% 100.00%
90.91%
FIRE SERVICES OPERATION MAINTENANCE OCCUPATIONAL HEALTH SERVICES
SECURITY SITE INCIDENT CONTROLLER (SIC)
OVERALL RATING -95.47 %
PERFORMANCE OF EMERGENCY RESPONDERS , MOCK DRILL ,LEVEL-1 , FCCU , 27.08.2018
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/07
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-02.00 19.09.2018 Page 14 of 14
Some of the good points / strengths observed
1. All Communication was done as per new procedure for Incident Communication. 2. Fire protection systems- Fire Extinguishers / Fire Hydrants / Water Monitors/ Water
Spray Systems were actually operated and they worked well. 3. Refinery Shift Manager and Site Incident Controller were very active and had very good
incident command & control. 4. All Fire crew were donning SCBA sets and three layer Inherent Fire Resistant (IFR)
Nomex Suits.
Discussion Points
1. The casualty was left unattended for some time and Fire Crew was not informed to rescue the casualty initially,
2. Site Incident Controller did not address employees and Contract Workmen assembled at Safe Assembly Point and did not appraised them of the incident.
3. Identification for different Emergency Responders viz Maintenance Team.
Areas for Improvement
Sr. No.
Observation Recommendation Responsibility Target Date
1. Nil Nil Nil Nil
This report shall be discussed in next Area Safety Committee Meeting.
……………………..END OF REPORT……………………….
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 1 of 14
Date : 25.07.2018
Plant /Unit : LABORATORY
Location : ELECTRICAL ROOM
Equipment : Distribution Board LAB NP-5614 A/B
Scenario:-
Fire in Distribution Board of Electrical Room in the Laboratory, causing dense smoke; which is suck by the HVAC inlet and the smoke spreads all over the Laboratory through HVAC duct. This warrants immediate evacuation of the Laboratory Building.
Building Description
Laboratory Building consists of GC Lab , R&D Lab , Expansion Lab , Water Lab , Petroleum Section Lab , Sample Retention Room , Sample Bottle Washing Area , Electrical Room , ATF Lab, TBP Engine Room Floor Area of the Building ( Approx) - 2500 Square Mtrs.
Nos. of Occupants ( Approx) – 50
Occupant Density (Approx.) – 50 Sq. Mtrs / Person
Nos. of Exits – 5
Casualty -01 One Lab Chemist in the nearby Petro Lab got exposed to toxic smoke and collapsed on the ground.
Time of Initiation : 11:46:00 Hrs. Time of Alarm : 11:46:18 Hrs
Time of “All Clear” : 12:00:15 Hrs. Total Duration of Drill: 14 Min 15 Sec
Observers
S.N. Observer's location Name 1 Emergency Site - Site Incident
Controller (SIC) Shri Anil Vishwambharan, Head– CRG
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 2 of 14
2 Emergency Site- Operations & Maintenance
Shri Ashish Kumar Sen, JGM-Security
3 Refinery Fire Control Room Shri Amit Kumar Parmar, Sr. Manager – Instrumentation
4 Laboratory Shift Incharge Room Shri Himanshu S. Mishra , DGM –HSEF
5 Emergency Site – Security / Medical Services
Shri IVN Raju, DGM- Operations , Utility 2 Base
6 Emergency Site – Fire Services Shri Sudhir Ingle , Head -Fire 7 Mock Drill – Co-Ordinator Shri Himanshu S. Mishra , DGM –HSEF
Emergency Management Team
Site Incident Controller : Major Vikram Sinha , Head- Administration
Refinery Shift Manager : Shri Samir Bhowmick
Area Manager : 1. Dr. Pradeep Prabhu, Area Manager
2. Shri Dhiraj Gondalia , JGM- Technical Services
Shift –In-Charge (Operation) : 1. Shri Divyesh Desai
Maintenance Manager : 1. Md. Amir Khan , Electrical
Fire Officer : 1.Shri Y.B.Zala 2. Shri Karthik M.I. , 3. Shri Shivam Tripathi
Security Officer : 1. Shri Virender Singh
Lab Chemist ( Communication) : 1. Shri Bhowmick Kaneria
Lab Chemist : 1. Shri Rajesh Butani, 2. Milan Nathwani
3. Mahesh Jesadia
Auxiliary Fire Squad : 1. Shri Sanjay Prajapati , FCCU
Injury, if any: - : 01 (Employee) Shri Chintan Patel
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 3 of 14
Mock Drill Chronology
Time Actions 11:46:00 Hrs Emergency Scenario activated by Laboratory team after the scenario was
explained to the Lab Chemist Shri Mahesh Jesadia by Observers. 11:46:18 Hrs
MCP 57 HS 1003 was activated by Shri Mahesh Jesadia , Lab Chemist, hooter and beacon activated and the same got repeated at Refinery Fire Station.
11:46:18 Hrs Shri Bhowmick Kaneria , Lab Chemist , informed fire control room about “ Fire in Electrical Room ” on emergency number 1111.
11:46:18 Hrs
Evacuation of all non - essential personnel from Laboratory started. All occupants evacuated to Safe Assembly Point within two minutes.
11:46:40 Hrs
Multi Purpose Fire Tender (MPFT) with crew followed by Ambulance and Shift Fire Officer Shri Y.B.Zala in Fire Jeep J6 ,turned out from Refinery Fire Station.
11:46:58 Hrs
Simultaneously, Dry Chemical Powder (DCPT-01) with crew turned out from Auxiliary Fire Station, CPP.
11:47:00 Hrs One CO2 9 Kgs fire extinguisher was operated by Shri Ashish Dhamsania , Lab Chemist.
11:47:15 Hrs
Dynamic Blast Call (Group 4) – phone activated by Fire Control Room operator to inform all primary responders. It worked well.
11:47:30 Hrs
Shri Divyesh Desai ,Shift In Charge – Laboratory arrived at incident site and took control of the situation.
11:48:20 Hrs Multi Purpose Fire Tender MPFT with crew followed by Ambulance and Shift Fire Officer Shri Y.B.Zala in Fire Jeep J6 arrived at incident site from Refinery Fire Station.
11:49:00 Hrs
Fire Crew donning SCBA sets and single layer inherent fire resistant (IFR) Nomex Suits carried out search and rescue.
11:49:00 Hrs
Shri Samir Bhowmick , Refinery Shift Manager (RSM), arrived at incident site and supported Site Incident Controller (SIC).
11:49:10 Hrs
One Lab Chemist in the nearby Petro Lab got exposed to toxic smoke and collapsed on the ground. He was rescued by Laboratory personnel, given safety shower and taken to OHC by Ambulance with the help of Fire Operators.
11:49:53 Hrs
DCP Tender DCPT-01with crew arrived at incident site from Auxiliary Fire Station- CPP and took position on east side of Lab.
11:50:00 Hrs
Security – Patrolling officer Shri Virendra Singh with QRT team -06 guards arrived at the incident site. Cordoned and evacuated the area. Regulated traffic.
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 4 of 14
11:52:00 Hrs
Level-1 declared & Dynamic Blast Call (Group 1) – phone activated by Fire Control Room operator to inform all primary responders. It failed.
11:52:00 Hrs Major (Retd.) Vikram Sinha arrived at incident site and took charge as Site Incident Controller(SIC).
11:54:00 Hrs Site Incident Controller took feedback about the injured person from OHC. 11:54:00 Hrs Electrical Maintenance Team with Shri Amir Khan along with two Electrical
Technician arrived at incident Site with tool kit and carried out electrical isolation from nearby Sub Station ES - 53
11:56:00 Hrs Fire under control. 11:56:00 Hrs Fire crew searched entire laboratory area including terrace once again for any
more casualty. No more casualty found. 11:58:00 Hrs Fire extinguished completely. 11:58:00 Hrs Head Count report given by Security Officer Shri Virendra Singh – at
Assembly Point and incident site – Contract workmen- 16 , Employees – 59 , Casualty -01(Employee ) ,Visitor – 02 , Total- 78 personnel.
12:00:15 Hrs All Clear – declared by Major (Retd.) Vikram Sinha ,Site Incident Controller (SIC)
12:01:00 Hrs Knock Off and make up ordered for Fire Crew. 12:02:18 Hrs Dynamic Blast Call (All Clear ) – phone activated by Fire Control Room
operator to inform all key personnel. It worked well. 12:03:00 Hrs Site Incident Controller Major (Retd.) Vikram Sinha addressed the employees
and Contract Workmen assembled at Safe Assembly Point and appraised them of the incident and the emergency control measures and that it was safe to go back to work now.
12:10:00 Hrs Debriefing Session was held at LAB – Pantry Room.28 employees participated.
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 5 of 14
Head Count
Personnel Reported for Duty on the day / shift
Actual head count at incident site
Head count Safe Assembly
Points
Total head count
Employees 59 03 55 58 Contract Workmen 17 00 17 17 Casualty / Injured Nil 01 Nil 01 Visitors 02 Nil 02 02 Total 78 04 74 78
17
59
0
2
78
16
59
1
2
78
0 10 20 30 40 50 60 70 80 90
CONTRACT WORKMEN
EMPLOYEES
Casualty / Injured
VISITORS
TOTAL
HEAD COUNT TALLY - LAB - 25.07.2018
Actual head count during incident Present on date
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 6 of 14
Evaluation Sheet # 1
Location :- Refinery Fire Station Control Room
Observer :-– Shri Amit Kumar Parmar , Sr. Manager – Instrumentation.
The observers assessment was based on the following Actions Events
Fire Control Room Events Time & Date of call : 11:46:18 Hrs on 25.07.2018 Mode of call ( Incident Information received ) :- MCP/Gas Detector/ Toxic gas detector/Heat/Smoke
MCP # 57 HS 1003
Telephone / Hotline/ Landline/ CUG/wireless/Messenger/
From 1727 to 1111
Record Name of Caller: Shri Bhowmick Kaneria , Lab –Chemist.
Information to :- (All below information to be conveyed within 3 minutes time.) Information to Yes / No Marks (max) Evaluation Remarks
Shift Fire Officer Yes 1 1 Turnout crew / Turn out bell Yes 2 2 Dynamic Blast Call – (Primary Responders/Secondary Responders & Key Personnel as per level of Emergency ; All Clear)
First Turn Out – Group 4 Yes 4.5 4.5 Blast call failed 5 times.
Level1 Yes 5 5
Level2 ------ ------ ------ Not required L1
All Clear Yes 2 2
Panel Officer of affected unit Yes 1 1 In case of failure of Dynamic Blast Call Inform all key personnel of Group-4 as per Dynamic Call Blast annexure. ------ ------ ------ Not required
Inform affected Plant/Unit Panel Officer to communicate all key personnel of Operations & Maintenance for help.
------ ------ ------ Not required
Inform Head – Laboratory to mobilise Auxiliary Fire Squad and Trained First Aiders ------ ------ ------ Not required
In case of declaration of level 2 and higher emergency level Emergency Siren actuation ( As per direction of SFO)
Level 2 Level 3 All Clear ------ ------ ------ Not required L1
Mutual Aid Members ( As per direction of SFO) ------ ------ ------ Not required L1
Total- 15.5 15.5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 7 of 14
Evaluation Sheet # 2
Location :- Respective Plant / Unit Process
Observer :-– Shri Himanshu S. Mishra , DGM – HSEF
Respective Plant / Unit Process Control Room Events ( Laboratory ) Events Time & date of call 16:02:58 Hrs on 21.07.2018 Mode of call ( Incident Information received ) :- MCP/Gas Detector/ Toxic gas detector/Smoke detector
MCP # 20 HS 811
Telephone: Landline/ CUG/wireless/In person
In person by shouting – “Fire ! Fire!! Fire !!!”
Record Name of Caller from whom information received :
Shri Mahesh Jesadia , Lab Chemist
Information to :- (All below information to be conveyed within 3 minutes time.)
Information to Yes / No Marks (max) Evaluation Remarks Shift In Charge - Laboratory Yes 1 1
Refinery Fire Station ( Hot Line / Ext -1111) Yes 2 2 Announcement on PA system in three languages ( Hindi, English, Gujarati ) for stopping all the jobs & evacuation
NA NA NA
Refinery Shift Manager (RSM) Yes 1 1
Site Incident Controller (SIC) Yes 1 1
Area Manager Yes 1 1 Asstt. Area Manager Yes 1 1 Maintenance Manager – Shift I/C Yes 1 1
Head – Technical Services Yes 1 1 WWTF ( Utility ) NR NR NR Emergency Control Actions :- Execution of Emergency Control actions Yes 2 2
Information to upstream / downstream / neighboring units / other stake holders Yes 1 1
Announcement on PA system in three languages ( Hindi, English, Gujarati )- All Clear
NA NA NA
Total- 12 12
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 8 of 14
Evaluation Sheet # 3
Location :- Incident Site – LABORATORY
Observer :-– Shri Ashish Kumar Sen , JGM – Security
Actions by Operations team at Incident Site Events Yes / No Marks (max) Evaluation Remarks Call Initiation – MCP / Emergency No. Yes 2 1 MCP # 57 HS 007 did not
activate.
Sounding of Local Siren / Hooter Yes 1 1 Alert other people around in nearby units/ facilities – as per emergency conditions Yes 1 1
Stop Hot /cold jobs Yes 1 1
Casualty search and initial handling by operation team /AFS Yes 1 1
Equipment isolation, valve closing as per SOPs Yes 2 2
DCS control, instruction issued to Field Yes 1 1 Fire & Gas detection system available & their performance Yes 2 2
Fire Extinguishers available & used. Their performance Yes 2 2
CO2 -09 Kgs -01 operated.
Hydrant/Monitor used and their performance Yes 2 2
Assemble at Safe Assembly Point. Yes 1 1
Direction to Fire Services / Emergency Responders and necessary information Yes 1 1
SCBA set / BA Trolleys used & their performance Yes 1 1
PPE's Helmet/Safety shoes/ gloves/ goggles / Earplugs Yes 1 1
19 18
Actions of Maintenance Team at Incident Site
Timely response of Maintenance Team with tools & tackles & manpower(Max- 8 Min for Base Refinery, 12 Minutes for Train -1 units and off sites , 20 Minutes for COT)
07 Min 42 Sec
3 3
Use of proper tools & tackles – flame proof / precautions/ PPEs as per TBRA Yes 2 1.5
Electrical Technician without proper PPEs
Special PPE's – HR Suits , SCBA sets , BA Trolley
Yes 1 1
6 5.5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 9 of 14
Evaluation Sheet # 4
Location :- Incident Site – LABORATORY
Observer :-– Shri Anil Vishwambharan , JGM and Head-CRG
Actions by SITE INCIDENT CONTROLLER (SIC) Events Yes / No Marks (max) Evaluation Remarks Response Time (Max- 4 Min for Base Refinery, 6 Minutes for Train -1 units and off sites/VPCL, 20 Minutes for COT)
02 Minutes 42 Sec 3 3
RSM-02 Min 42 Sec SIC – 05 Min 42 Sec
Co-Ordination with Emergency Responders :- Fire Coordinator – Fire & rescue operations , Special Services Yes 2 2
Security & Evacuation Co-Ordinator : Head Count / Traffic Control / Mob Control Yes 2 2
Medical Team- Casualty shifting and handling at OHC , further actions Yes 2 2
Emergency Support Co-Ordinator – Mobilisation of Auxiliary Fire Squad ,Trained First Aiders
Yes 2 2
Unit /Plant Operations – Fuel / Energy/Toxic isolation, Safe Shut Down, Emergency Control Actions / Environment related actions.
Yes 4 4
Maintenance Team – Leak Sealing, Insulation removal , Power Isolation , Heavy Equipment Mobilization, Lighting, Dewatering , hot bolting etc.
Yes 2 2
Utility Team – Fire Pump Operation , Hydrant System Pressure , Water Make Up , Steam , Nitrogen , Plant Air etc.
Yes 2 1.5 Did not talk to Utility Team even though checked hydrant press.
Incident Command & Control :- Sizing up the situation – Overall effective emergency response & control actions Yes 3 3
Declaration of Level2 emergency in consultation with CIC ---------- -------- --------
Two way Communication with Emergency Control Centre ---------- -------- --------
Communication - with Fire /Security/Operation / Maintenance Yes 3 3
Overall Incident Command and control skill Yes 3 3
Declaration of "All Clear" (in consultation with other Emergency Responders & CIC , after final Search & Rescue , LEL / Toxic Gas Check.)
Yes 1 1
Jacket & PPE's including SCBA / Escape set (ELSA) Yes 1 1
Total- 30 29.5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 10 of 14
Evaluation Sheet # 5 Location :- Incident Site – LABORATORY
Observer :-– Shri Sudhir Ingle, Head- Fire
Actions by FIRE CREW
Events Yes / No Marks (max) Evaluation Remarks
Response Time (Max- 3 Min for Base Refinery, 6 Minutes for Train -1 units and off sites , 20 Minutes for COT from RFS)
02 Minutes
52 Seconds 3 3
MPFT DCPT-02 J5 J6
Proper approach and Parking of Fire tender Yes 1 1
Mobilization and utilization of Auxiliary Fire Squad & Trained First Aiders
Yes 2 2
Fire Extinguishing Media application & its effectiveness Yes 2 2
Search and Rescue Yes 3 3
Help to Operations / Maintenance personnel for closing /opening the valves for isolation etc.
Yes 1 1
Command & Control of the Fire crew and fire-fighting/ Emergency operations
Yes 2 1
Method and speed of Action Yes 2 2
Co-ordination with SIC/ Shift In Charge /RSM by Fire coordinator. Yes 1 1
Feedback by Fire Coordinator to Refinery Fire Control room. Yes 1
1
Fire Fighter appropriate PPE's used - Fire Suits / Chemical Suits / SCBA / Gum Boot etc.
Yes 4 4
Mobilisation of additional resources – Fire Tenders , Manpower , Special equipments , SCBA sets , Trailer Mounted HVLRMS etc.
Yes
5 5
27 27
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 11 of 14
Evaluation Sheet # 6
Location :- Incident Site – Laboratory
Observer :-– Shri IVN Raju, DGM – Operations , Utility 2 Base
Actions by Security team
Events Yes / No Marks (max) Evaluation Remarks
Response Time (Max- 6 Min for Base Refinery, 10 Minutes for Train -1 units and off sites/ VPCL , 20 Minutes for COT from Refinery)
03 Minutes 42
Sec 2 2
Road Clearing/Barriers clearing. Yes 0.5 0.5
Proper approach, cordoning off area Yes 1 1
Report to SIC/RSM/Shift- In-Charge -Operation Yes 0.5 0.5
Facilitate Evacuation of Non- Essential Personnel Yes 1 1
Head count Done 2 2
Traffic Control at entry and exit points Yes 1 1
Removal of unwanted vehicles Yes 0.5 0.5 Help in Controlling Emergency Yes 0.5 0.5
PPE's Helmet/Safety shoes/gloves/goggles/Earplugs /SCBA etc
Yes 1 1
Total- 10 10
Actions by OHC - Medical team Response Time (Max- 3 Min for Base Refinery, 6 Minutes for Train -1 units and off sites/VPCL , 20 Minutes for COT )
02 Minutes 52
Seconds 1 1
Parking Ok 1 1 Casualty Shifting Ok 2 2 Mobilizing other Ambulances and treatment at OHC Ok 1 1
Total- 5 5
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 12 of 14
Emergency Responders Performance Rating
Sr. No. Emergency Responder
Marks obtained Full Marks
Marks obtained %
Rating
1 FIRE SERVICES 42.5 42.5 100 % Excellent
2 LABORATORY 30 31 96.77 % Excellent
3 MAINTENANCE 5.5 6 91.67 % Very Good
4 OCCUPATIONAL HEALTH SERVICES
5 5 100.00 % Excellent
5 SECURITY 10 10 100.00 % Excellent
6 SITE INCIDENT CONTROLLER (SIC)
29.5 30 98.33 % Excellent
TOTAL 122.5 124.5 82.39 %
Overall Rating 98.39 % Excellent
Rating Criteria 95 to 100 % Excellent 75 to 84.99 % Good Less Than 70% Needs improvement 85 to 94.99 % Very Good 70 to 74.99 % Average
100.00%
96.77%
91.67%
100.00% 100.00%
98.33%
FIRE SERVICES LABORATORY MAINTENANCE OCCUPATIONAL HEALTH SERVICES
SECURITY SITE INCIDENT CONTROLLER (SIC)
OVERALL RATING -98.39 %
PERFORMANCE OF EMERGENCY RESPONDERS , MOCK DRILL ,LEVEL-1 , LAB, 25.07.2018
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 13 of 14
Some of the good points / strengths observed
1. Entire laboratory was evacuated within 90 Seconds. 2. Good casualty handling by laboratory personnel and safety shower given. 3. Good communication between Emergency Responders and to all key personnel.
Discussion Points
1. Portable Loud phone to be used by Site Incident Controller to addressed employees and Contract Workmen assembled at Safe Assembly Point. It is available with Security.
2. Refinery Shift Manager Vehicle is not properly identified and needs to have placard or some clear identification. It should be properly identified like fire vehicle.
3. HVAC air inlet should not be through Electrical Room and should be from fresh air source.
4. Wardens for different floor areas / sections of Laboratory to be appointed and to given identification with fluorescent jackets.
5. Head- Laboratory and JGM- Laboratory immediately evacuated and did not participate in emergency handling.
6. Paramedics are not available in Ambulance and only a transport driver handles the casualty , who remains unattended during transit from incident site to OHC – point raised by SIC.
Areas for Improvement
Sr. No.
Observation Recommendation Responsibility Target Date
1. Glass doors of electrical room not properly marked (Exit/ Entrance) and need to be identified.
Glass doors of electrical room not properly marked (Exit/ Entrance) and need to be identified.
Dr. Pradip Prabhu 31.09.2018
2. Laboratory Chemist broke three manual call points (MCPs) but none of them activated.
All MCPs in the Laboratory to be checked for reliability and training to be given to all Laboratory Personnel to activate MCP properly.
Shri Sudhir Ingle 12.08.2018
MOCK DRILL REPORT(LEVEL-1)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/06
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 14 of 14
3. HVAC suction is through Electrical Room and is directly connected with HVAC Room , thus enabling smoke suction by HVAC during fire and its fast spread into all areas of Laboratory.
Fire doors to be provided at Electrical Room to not to allow smoke suction by HVAC and its fast ingress into all areas of Laboratory – after a review of passive fire protection.
Dr. Pradip Prabhu 31.03.2019
4. Cable Trenches in Electrical Room not covered properly, posing fall hazard.
Cable Trenches in Electrical Room to be covered properly.
Dr. Pradip Prabhu 12.08.2018
5. Stair Case Area for terrace is blocked with Cup Boards, broken chairs , obsolete furniture etc. The same blocks the exit. The same to be cleared as soon as possible.
Stair Case Area for terrace to be cleared of Cup Boards , broken chairs , obsolete furniture etc.
Dr. Pradip Prabhu 12.08.2018
This report shall be discussed in next Area Safety Committee Meeting.
……………………..END OF REPORT……………………….
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 1 of 11
Date : 15.06.2018
Plant /Unit : NHT/CCR
Location : Pump Area
Equipment : Stripper Column 32 C-001
Scenario:-
1. Large leak from Stripper Column 32 C-001, bottom line 20” flange, due to gasket failure at an
elevation of about 3 Mtrs. 2. Large Vapor cloud of naptha is formed and toxic release of Hydrogen Sulphide takes place
affecting all the nearby units. 3. Subsequently, it catches fire from unknown source, resulting in Vapor Cloud Explosion and
major fire. 4. This results into full bore rupture of the line and further escalation of fire and toxic release.
Process Condition
Temp- 180-190 ºC, Pressure – 10.5 – 11.0 Kg/Cm², Column volume - 160 m3
Hold up that will leak before suitable action is taken (20 Min) – 55 MT.
Composition - Naphtha (C1-C-4 in off gas, H2S – 4-5 % in off gas, rest naphtha at the bottom)
Casualty - 02
1. One contract workmen (Civil - Insulator) who was working nearby got exposed to toxic release and felt unconsciousness.
2. Later, one field officer got engulfed in the pool fire, got major burn injuries, toxic exposure and collapsed on the ground.
Time of Initiation : 15:09:00 Hrs. Time of Alarm : 15:09:25 Hrs
Time of “All Clear” : 15:36:52 Hrs. Total Duration of Drill: 27 Min 52 Sec
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 2 of 11
Observers
S.N. Observer's location Name 1 Emergency Site - Site Incident
Controller (SIC) Shri Sanjay Kulwal , GM –Operations and Area Manager – DHDS/ARU/SRU
2 Emergency Site- Operations & Maintenance
Shri Dipal Phukan , GM –Operations and Area Manager – HMU-2
3 Refinery Fire Control Room Shri Jilesh Lalani , DGM – Operations ,CPP 4 CCB Control Room-DCS -Panel Shri Chetan Popat , JGM – Operations , PIT
5 Emergency Site – Security / Medical Services
Shri Amarjitsinh Jadeja , DGM- Administration
6 Emergency Site – Fire Services Mr. Omprakash Luhana ,DGM- Operations,CDU1 7 ECC 1, Security Command Centre Mr. Samirkumar Dave ,Head –Operations -CPP 8 Fire Pump House Shri Jigar Parikh, DGM – Mechanical Maintenance 9 Occupational Health Centre(OHC) Shri Rajendra Arya ,JGM- Operations ,Utility 1
base 10 Refinery Main Gate Shri Jatin Joshi ,DGM – Warehouse 11 Mock Drill – Co-Ordinator Shri Himanshu S. Mishra , DGM –HSEF
Mock Drill Chronology
Time Actions 15:09:25 Hrs Emergency Scenario activated after H2S Gas detector # 30 AT 130 was
activated by Instrumentation Team. 15:09:50 Hrs MCP # 30HS 224 was activated by Shri Mehul Goswami, Pump Area, Field
Officer; hooter and beacon started, fire alarm received at RFS and NHT/CCR Panel.
15:09:50 Hrs
Shri Manoj Vora , Panel Officer, NHT/CCR informed Refinery Fire Control Room on Emergency Number -1111 about leakage of Naptha and H2S in Pump Area of NHT/CCR.
15:09:50 Hrs Evacuation of all non - essential personnel from NHT/CCR area started. All occupants evacuated to Safe Assembly Point within two minutes.
15:10:00 Hrs
Shri Manoj Vora, Panel Officer, NHT/CCR made announcement in Hindi, English and Gujarati “Leakge of H2S in Pump area. Stop all jobs and evacuate”.
15:10:05 Hrs Multipurpose Foam Tender (MPFT) with crew followed by Ambulance and Shift Fire Officer Shri Mahesh A. Patel by Fire Jeep J6 turned out from
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 3 of 11
Refinery Fire Station. 15:10:05 Hrs DCP Tender DCPT-02 with crew turned out from Auxiliary Fire Station ,CPP 15:11:00 Hrs Shri Mehul Goswami, Field Officer after donning SCBA set, located a
contract workmen (Civil - Insulator) who was working nearby got exposed to toxic release and felt unconsciousness. He shifted him to a safer location.
15:11:00 Hrs Water Spray System of NHT/CCR process area was operated by Field Officer. DV Nos. 8,9,10,14,15 activated.
15:11:30 Hrs High Volume Long Range Monitors (HVLRMs) on west and east side of the NHT/CCR units were operated.
15:11:46 Hrs Dynamic Blast Call (Group 4) – phone activated by Fire Control Room operator to inform all primary responders. It worked well.
15:12:00 Hrs Shri Kirit Patel, Shift In Charge - Operations arrived at incident site and took control of the situation.
15:13:47 Hrs
Multipurpose Foam Tender (MPFT) with crew followed by Ambulance and Shift Fire Officer Shri Mahesh A. Patel by Fire Jeep J6 reached at spot.
15:13:47 Hrs DCP Tender DCPT-02 arrived at incident site at NHT/CCR from Auxiliary Fire Station.
15:14:00 Hrs Shri Madhusudhan C. (Area Manager) and Shri Yogeshkumar Patel (Astt Area Manager) - Operations, NHT/CCR arrived at site and took control of the emergency situation.
15:14:15 Hrs Sh T. Chandrashekhar, Refinery Shift Manager (RSM) arrived at site and took control of the emergency situation.
15:14:50 Hrs Dynamic Blast Call (Level-1) – phone activated by Fire Control Room operator to inform all key personnel It worked well.
15:14:59 Hrs Ambulance left for OHC with casualty. 15:15:00 Hrs Smt Priya Ayengar (Environment) arrived at site. 15:15:00 Hrs One DCP -9 Kgs Fire Extinguishers were operated by field officer. Fire crew
provided water curtain on west side of Stripper Column 32 C 001. 15:15:00 Hrs Security Officers Shri Surendrasinh Jam , Patrolling Officer followed by Shri
T.Cherian with Quick Response Team of Security personnel arrived at incident site from upwind direction, after cordoning the area and ensuring safe evacuation of non- essential personnel at Safe Assembly Point .
15:15:00 Hrs Shri Amar Kumar arrived at site and took control of the emergency situation as Site Incident Controller (SIC).
15:15:00 Hrs Shri Jayesh Gajjar, Head – ISBL1 arrived at site and took control of Plant –Operations.
15:15:00 Hrs Sh Sudhir Ingle, Head - Fire arrived at site by Fire Jeep J3 and took command of firefighting and rescue operations.
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 4 of 11
15:15:00 Hrs DCP tender-2 , vessel No- 1 was charged and started DCP application 15:15:30 Hrs Mechanical Maintenance Team with Shri Darshan Thanki ,
One Supervisor and one two mechanical technician with spark proof tools and Tool Box arrived at the incident site.
15:16:00 Hrs Electrical Maintenance Team with Shri Vishnu Prajapati arrived at the incident site with two electrical technicians.
15:16:00 Hrs 2 I/C Security Officer Mr. A.K.Sen arrived at Site and took control of the situation
15:17:00 Hrs Instrumentation Maintenance Team with Shri Darshit Dholakia arrived at the incident site with one instrument technician.
15:17:39 Hrs Combined Fire Tender CFT with Shift Fire Officer Shri Sudhir Singh turned out from Refinery Fire Station to NHT/CCR.
15:18:00 Hrs Fire situation escalated and engulfed the entire area of NHT/CCR – Unconfined Vapour Cloud Explosion (UVCE) takes place.
15:18:40 Hrs Level 2 Emergency declared by SIC Shri Amar Kumar 15:19:00 Hrs Sh Vinay Kumar, Field officer NHT/CCR got injured and collapsed on the
ground. He was rescued by Fire crew & sent for treatment at OHC. 15:20:00 Hrs 2nd Ambulance reported at site 15:20:32 Hrs Dynamic Blast Call (Level-2) – phone activated by Fire Control Room
operator to inform all key personnel It worked well. 15:20:32 Hrs Emergency Siren of ISBL-1 was blown to declare level 2 emergency in the
Refinery Complex. 15:20:33 Hrs Combined Fire Tender CFT reached at site and took position from east side,
starting foam application from Medium Expansion Foam Generator. 15:22:04 Hrs Mutual Aid Scheme assistance requisitioned by Head- Fire and the same
was communicated to MAS control Room, Jamnagar from Refinery Fire Control Room.
15:25:00 Hrs Shri Jimeet Patel, with Team Administration arrived at ISBL 1 Gate with food & beverages along with 5 service boys. But, they could not deliver the same to Emergency Responders.
15:25:00 Hrs Emergency Support Co-Ordinator Shri Dhiraj Gondalia with Auxiliary Fire Squad (AFS) -02 personnel and Trained First Aider -03 Personnel arrived at the incident site and reported to Head- Fire for help.
15:25:00 Hrs NHT/CCR Unit safe shut down and depressurization started. 15:25:15 Hrs One transport bus reported at Incident Site for evacuation purpose. 15:26:00 Hrs Chief Medical Officer Dr. Maulesh Patel called OHCs of RIL, EPGL for
Mutual Aid Assistance. 15:30:00 Hrs Inspection team reported at site
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 5 of 11
15:30:33 Hrs Fire under control – message by Head -Fire 15:31:00 Hrs Maintenance team started leak sealing activities. 15:36:00 Hrs Site Incident Controller checked casualty status, they had been referred to
Jamnagar for further treatment by Chief Medical Officer. 15:36:00 Hrs Head Count report given by JGM -Security Shri A.K.Sen – at Assembly Point
and incident site – Contract workmen- 138 including 6 women, Employees – 05 , Casualty -2, Visitor – Nil, Total- 145 personnel.
15:36:00 Hrs Fire Crews carry out search & rescue for any more casualties including the upper floors of the unit.No more casualty found.
15:36:50 Hrs Duty Doctor from OHC informed PO that injured personnel were referred to Jamnagar for further treatment- feedback
15:36:50 Hrs Operation personnel and Fire Personnel checked LEL and H2S in the area. It was nil.
15:36:52 Hrs All Clear – declared by Site Incident Controller (SIC), Shri Amar Kumar. 15:37:00 Hrs All Clear announcement by Panel Officer in Hindi,English,Gujarati. 15:37:15 Hrs Emergency Siren of ISBL-1 was blown in All Clear mode. 15:38:00 Hrs Dynamic Blast Call (All Clear) – phone activated by Fire Control Room
operator to inform all key personnel. It worked well. 15:38:00 Hrs 3rd time Ambulance reported at site 15:40:00 Hrs Shri Amar Kumar, Site Incident Controller (SIC) addressed employees and
Contract Workmen assembled at Safe Assembly Point and appraised them of the incident.
15:45:13 Hrs Mutual Aid Scheme team of RIL, Motikhavdi with Foam Tender and Ambulance reported at Site.
15:45:46 Hrs Mutual Aid Scheme team of BORL, Vadinar with Foam Tender and Fire Crew reported at Site.
15:55:00 Hrs Mutual Aid Scheme team of IOCL, Vadinar with Foam Tender and CISF -Fire Crew reported at Site.
15:57:00 Hrs Mutual Aid Scheme team of GSFC, Sikka with Foam Tender and CISF -Fire Crew reported at Site.
16:00:00 Hrs Debriefing Session was held at Emergency Control Centre 1, Security Command Centre - 28 Employees participated.
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 6 of 11
Some of the good points / strengths observed
1. Very good co-ordination between all Emergency responders including Operations, Maintenance, Fire Services, OHC, Utility etc.
2. Seamless communication between incident site, Emergency Control Centre and between Chief Incident Controller and Site Incident Controller.
3. Fire protection systems- Fire Extinguishers / Fire Hydrants / Water Monitors/ Water Spray Systems were actually operated and they worked well.
4. Fire Pumps in Refinery Fire Pump House started in sequence in Auto Mode as per fire water demand and water make up was done.
5. All Fire crew were donning SCBA sets and three layer inherently Fire Resistant Nomex Suits.
6. Auxiliary Fire Squad (AFS) and Trained First Aiders (TFA) were mobilized by Emergency Support Coordinator at incident Site very promptly.
7. All communication systems were operated and worked well including –Dynamic Call Blast System, Wireless Communication – VHF, Tetra and BSNL phone.
8. The whole incident was being monitored by CCTV from Emergency Control Centre. 9. Transport Bus was mobilized to evacuate the area effectively. 10. Mutual Aid Scheme members viz. IOCL, BORL, RIL, GSFC responded very promptly
with Fire Tender /Crew and Ambulance also.
Discussion Points
1. Refinery Complex level Emergency Sirens for ISBL 1 was blown and it worked well. Employees / Workmen / Community personnel responded well to the same. However, the same was not audible at Refinery Pump House.
2. CCTV Camera was being viewed by Chief Incident Controller and Team at Emergency Control Centre – in a TV monitor which could be made available on a larger screen with the help of OHP Projector.
3. Economic Planning & Scheduling (EPS) department was not informed about the NHT/CCR unit shut down.
4. Affected Area at Incident Site was not barricaded to warn about the leakage/ fire. 5. Food and Beverages for Emergency Response Team was mobilized by Team
Administration, but the same could not be delivered to the destination, as the catering team kept waiting at Safe Assembly Point rather than finding proper route of delivery.
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 7 of 11
Areas for Improvement
Sr. No.
Observation Recommendation Responsibility Target Date
1. There was no alternative power supply for Emergency Control Centre in case of total / partial black out / power failure. UPS back up is only for some systems and that too for one hour.
Reliable UPS power back up for Emergency Control Centre to be reviewed and provided.
Atul Koranne 31.08.2018
2. Several spray nozzles of water spray system ( Deluge System) were found choked for DV # 8,9,10,14,15
All the Deluge Water Spray Systems in NHT/CCR to be checked for spray nozzle choking and to be rectified.
Madhusudhan C. 31.07.2018
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 8 of 11
Some Snaps of the Mock Drill Level-2 at NHT/CCR
Chief Incident Controller (CIC) and Secondary Emergency Responders in action at Emergency Control Centre,
Security Command Centre.
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 9 of 11
Site Incident Controller (SIC) in action at Incident Site. After all clear , he is addressing the contract workmen
and employees.
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 10 of 11
Operations and Maintenance Team in action at Incident Site.
Right - Debriefing at Emergency Control Centre after All Clear. Left – Mutual Aid Scheme Fire Crews
MOCK DRILL REPORT (LEVEL-2)
Refinery Integrated Management System
NAYARA ENERGY LIMITED , VADINAR
REPORT NO- ERDMP/MD/2018-19/04
Doc. No. - NAYA/HSEF/FIRE/R/032 Rev-01.00 30.06.2018 Page 11 of 11
Note: This report shall be discussed in next Area Safety Committee Meeting.
……………………..END OF REPORT……………………….
Fire Services Team in action at Incident Site. Auxiliary Fire Squad and Trained First Aiders reporting to Head –
Fire Services.
Annexure 1.9: CREP compliance
CHARTER ON CORPORATE RESPONSIBILITY FOR ENVIRONMENTAL PROTECTION Sector: Petroleum Crude Oil Refineries
Name of Industry: Nayara Energy Limited (Formerly known as ESSAR OIL LIMITED), (Refinery Division)
Address: Nayara Energy Limited, Post Box 24 PO: Khambhalia, Jamnagar – Okha
Code: 09 Highway, Dev bhumi Dwarka-361005
Sr. No./ Activity code
No Action Point (in brief) Action Taken Report
A AIR POLLUTION MANAGEMENT
1. All the refineries located in the critically polluted areas, identified by CPCB, will submit an action plan (within six months) for phase wise reduction of SO2 emission from the present level
Not Applicable:(Our refinery is neither identified by CPCB nor located in critically polluted area, hence condition is not applicable to us)
2. Future refineries will have Sulphur Recovery Unit (SRU) with minimum 99% efficiency
SRU is operated at more than 99.7% efficiency.
3. To enhance the efficiency of SRUs in the existing refineries, an expert committee will be constituted to look into various aspects and suggest a road map within six months.
Refinery SRU are always being at efficiency more than 99.7 %.
4. With regard to NOx emission, the new refineries/process units will install low NOx burners. For retrofitting of low NOx burners in existing units, the expert committee will suggest the strategies and action plan within six months including NOx standard.
All Heaters / boilers are equipped with Low NOx burners.
5. The flare losses will be minimized and monitored regularly
Flare loss is being estimated based on material balance and immediate actions are being taken to minimize losses.
6. Refineries will install continuous emission monitoring systems for SOx and NOx in major stacks with proper calibration facilities. Action plan for this will be submitted within six months
Stacks are already provided with continuous on-line emission monitoring systems for parameters SO2 and NOx since start-up of refinery in 2006. Coninuous Emission Monitoring data has been sent to CPCB server since June 2015. Regular calibration is being carried out for analyzers & calibration report & schedule given in Annexure-1.1.2 & 1.1.3
Sr. No./ Activity code
No Action Point (in brief) Action Taken Report
7. Refineries will also monitor total HC and Benzene in the premises (particularly at loading / un-loading operations and ETP). The status and action plan will be submitted within six months.
VOC monitoring is carried out in the viscinity of all potential sources of HC emission such as Primary ETP, Secondary ETP, Truck Loading Gantry, and Rail Loading Gantry. This is being done on monthly basis. VOC emission monitoring results for the month of Mar’18 to Aug’18 are shown below.
Sr. No.
VOC monitoring area / unit / plant
Unit VOC
Min-Max
1 Near Truck Gantry No. 5 (HC Truck Loading)
ppm 0
2 Primary Treatment Plant of Truck Dispatch Area
ppm 38-104
3 Expansion ETP ppm 191-243
4 Hazardous waste storage sites
ppm 0
5 Primary Treatment Unit of ISBL-1 process
ppm 132-194
6 At Battery Limit in CDU/VDU
ppm 0
7 At Battery Limit in CDU - II ppm 0
8 Downwind of equalization tank (Oil Separation Basin Unit-8400) of base ETP
ppm 263-292
9 Primary Treatment Plant of Crude Tank Storage (COT) Area
ppm 9.1-10.8
The detection limit of the instrument used for measurement of VOC is 0 to 10,000 PPM.
8.
The expert committee will also suggest an action plan, within six months, for control and monitoring of hydrocarbon loss & VOC emissions, leak detection and repair (LDAR) program and vapor recovery systems (for loading & unloading operations within refineries only.
We have established LDAR program. Under this program, total 35055 components have been monitored in period of Mar’18 to Aug’18.
B
WASTE WATER MANAGEMENT
1. Refineries will prepare action plan for conservation of water resources and maximizing reuse/ recycling of treated effluent within six months. The treated effluent discharge quantity (excluding once through cooling water) will be limited to 0.4 m3/per Ton (for 90% of time) except for the monsoon season.
Treated effleunt was reused / recycled with in refinery for the fire water make up, service water and feed to cooling tower make up,as a RO feed.
Sr. No./ Activity code
No Action Point (in brief) Action Taken Report
2. Oil spill response facilities at coastal refineries will be in position within two years. To facilitate this, MoEF will coordinate with Coast Guards, Port Trust and other departments
Oil Spill Disaster Contingency Plan Tier-1 response has been approved by Indian Coast Guard (ICG). Regular Oil spill mock drills (once in 6 month Tier-1 mock drill) are conducted with ICG & Deendayal Port Trust(DPT).
C
SOLID WASTE MANAGEMENT`
1. Refineries will explore new technologies for reduction in the generation of oily sludge. Strategy and action plan for liquidation of existing sludge will be submitted within six months
Oily sludge is co-processed in Delayed Coker Unit(DCU)
2. The petroleum coke having high sulphur content will only be sold to/ reused by organized industries (having consent from SPCBs), which have systems to control SO2 emissions. This will be ensured by June 2003.
Pet coke is sold to reputed Cement Manufactures such as ACC, Ambuja, Shree Cement, JK Cement,Ultratech, Diamond cement,Manglam Cement,Orient Cement etc.
NEW ACTION POINTS AS PER FIRST MEETING ON REVISED NATIONAL TASK FORCE HELD ON OCTOBER 09, 2009
1 Refineries will carry out monitoring and survey to assess HC loss and concentration of VOC in Ambient Air/ Wastewater treatment plant. (Action plan was to be submitted by Jan 2010)
We have established LDAR program. Under this program, total 35055 components have been monitored in period of Mar’18 to Aug’18.
2 Refineries will assess the quantity of flare gas. (Install the measurement system if the same is not possible) (Action plan was to be submitted by March 2010)
The flare loss is being asssed on mohtly basis and for last six months avg. flare loss is 0.21% of crude processed.
3 Assessment of Potential leakages from petroleum storage tanks. (Action plan was to be submitted by Jan 2010)
All tanks are above grounds. The highly volatile products / crudes are stored in floating roof tanks which are monitored regularly; so far we did not find any leakages from these tanks.
4 Cleaner Technology options and information to be provided to CPCB. (to be submitted by Feb 2010)
Low sulfur FO and FG, we are being used in heaters / furnaces.
Abbreviations: FO: Fuel Oil FG: Fuel Gas LDAR: Leak Detection & Repair VOC: Volatile Organic Compounds DPT: Deendayal Port Trust SPCB: State Pollution Control Board CPCB: Central Pollution Control Board
Vadinar Power Company Limited Domicile Detail of Employee as on 31.12.2016
Sr.
No.
Employee
CodeEmployee Name Level
Date Of
JoiningDept Supervisor Name Domicile
1 20000498 Suresh Intwala M-6 01.07.1993 Electrical Kishor Makadia Gujarat
2 20002161 Manish Desai M-8 14.06.2004 Mechanical Rakesh Kanani Gujarat
3 20003374 Samirkumar Dave M-4 19.04.2005 Operation Snehal Pandya Gujarat
4 20004035 Isaac Abraham M-7 29.08.2005 Operation Samirkumar Dave Other
5 20004095 Kishor Makadia M-2 14.09.2005 Head-VPCL Kalakota Reddy Gujarat
6 20004209 Snehal Pandya M-4 03.11.2005 Head-O&M Kishor Makadia Gujarat
7 20004238 Meval Das Mahant M-8 14.11.2005 Electrical Ashit Gothi Other
8 20004780 Manoj Mishra M-5 18.02.2006 C&I Sanjay Kumar Gupta Other
9 20005190 Ajay Kuvad M-8 24.05.2004 Electrical Vijay H Chauhan Gujarat
10 20005427 Krunal Patel M-6 07.04.2006 Operation Samirkumar Dave Gujarat
11 20006659 Udaysingh Solanki M-8 01.04.2006 Procurement Nilesh Dave Gujarat
12 20007464 Kantilal Makwana M-8 19.09.2006 IT Bhavesh Champaneri Gujarat
13 20009434 Manoj Kundu M-8 03.03.2007 Operation Ashok Chandna Other
14 20009523 Alok Ranjan M-8 15.03.2007 Operation Dipak Soni Other
15 20010605 RahulVardhan Sharma M-7 15.06.2007 Procurement Nilesh Dave Gujarat
16 20011247 Sanjaykumar Shah M-5 05.07.2007 Technical Services Kishor Makadia Gujarat
17 20011530 Rupak Patel M-6 16.07.2007 Operation Samirkumar Dave Gujarat
18 20011901 Girish Patel M-8 30.07.2007 C&I Manoj Mishra Gujarat
19 20011998 Sunil Desai M-8 12.07.2007 Technical Services Sanjaykumar Shah Gujarat
20 20012481 Manoj Makadia M-8 18.08.2007 C&I Manoj Mishra Gujarat
21 20012741 sandeep verma M-8 05.09.2007 C&I Manoj Mishra Gujarat
22 20013041 Sandeep Parmar M-8 01.07.2007 Civil Jayanti Kachhadiya Gujarat
23 20013478 Alpeshkumar Dhamsania M-8 24.10.2007 Electrical Lalitkumar Jethwa Gujarat
24 20015188 Vasant Chavda M-9 01.01.2008 HR Admin Santosh Tanwar Gujarat
25 20015901 Rahul Mudgil M-8 21.01.2008 C&I Manoj Mishra Other
26 20015909 Chandrakant Dehariya M-9 21.01.2008 Electrical Alpeshkumar Dhamsania Other
27 20015917 Robin singh M-9 21.01.2008 Electrical Alpeshkumar Dhamsania Other
28 20015924 Ketankumar Pancholi M-7 24.01.2008 C&I Manoj Mishra Gujarat
29 20017145 Sanjay Kumar Gupta M-4 05.04.2008 Head-Maintenance Snehal Pandya Other
30 20017754 Vipul Vaghasiya M-7 01.05.2008 Electrical Lalitkumar Jethwa Gujarat
31 20019970 Jayantilal Ramoliya M-8 03.07.2008 Electrical Vipul Vaghasiya Gujarat
32 20020004 Mitesh Bhatia M-7 07.07.2008 Operation Krunal Patel Gujarat
33 20020065 Sandeep Sudhakaran M-8 05.07.2008 Procurement Nilesh Dave Other
34 20020068 Avikal Sharma M-8 05.07.2008 Mechanical Hitesh Patel Other
35 20021190 Ajay Kumar Pal M-7 24.07.2008 Mechanical Hitesh Patel Other
36 20021529 Jayesh Vora M-8 07.08.2008 Electrical Amit Kumar Kansagara Gujarat
37 20022225 Neerav Nayak M-7 11.09.2008 Operation Rupak Patel Gujarat
38 20022893 Sanghesh Khobragade M-8 06.09.2008 Mechanical Hitesh Patel Other
39 20022894 Shyam Kumar Beshra M-8 06.09.2008 Mechanical Dinesh Prajapati Other
40 20022895 Giridharan Damodharan M-8 06.09.2008 Mechanical Jayanti Kachhadiya Gujarat
41 20022928 Amit Morzaria M-7 30.09.2008 Mechanical Sanjay Kumar Gupta Gujarat
42 20023382 Amit Kumar Kansagara M-7 06.10.2008 Electrical Lalitkumar Jethwa Gujarat
43 20023510 Ashish Kumar Godhani M-8 07.10.2008 C&I Manoj Mishra Gujarat
44 20023861 Ashit Gothi M-7 25.10.2008 Electrical Lalitkumar Jethwa Gujarat
45 20024062 Samir Patel M-7 06.11.2008 Power Commercial Kishor Makadia Gujarat
46 20024351 Anirudh Patel M-8 14.11.2008 Electrical Ashit Gothi Gujarat
47 20024384 Brijeshkumar Lalani M-9 17.11.2008 C&I Ketankumar Pancholi Gujarat
48 20024392 Sandeep Mandle M-10 05.11.2008 C&I Janak Pansuria Other
49 20024413 Vishwanath Khandare M-9 05.11.2008 Operation Rupak Patel Other
Annexure 1.11 Local Employee List
Vadinar Power Company Limited Domicile Detail of Employee as on 31.12.2016
Sr.
No.
Employee
CodeEmployee Name Level
Date Of
JoiningDept Supervisor Name Domicile
50 20024414 Naveen S Choudapurkar M-9 05.11.2008 Operation Rupak Patel Other
51 20024416 Bishwanath Naik M-9 05.11.2008 Electrical Ashit Gothi Other
52 20024418 Pravin Mankar M-10 05.11.2008 Mechanical Hitesh Patel Other
53 20024421 Dipak Choudhury M-9 05.11.2008 Operation Rakesh Kharat Other
54 20024478 Jaydeep Trivedi M-8 24.11.2008 Operation Krunal Patel Gujarat
55 20024479 Dhirajlal Chavda M-8 24.11.2008 Operation Rakesh Kharat Gujarat
56 20024484 Vijay H Chauhan M-7 28.11.2008 Electrical Lalitkumar Jethwa Gujarat
57 20024501 Mritunjay Kumar Gupta M-8 01.12.2008 C&I Manoj Mishra Other
58 20024578 Amit Vithalani M-8 08.12.2008 Electrical Vijay H Chauhan Gujarat
59 20024799 Vasantkumar Patel M-7 18.12.2008 Mechanical Jayanti Kachhadiya Gujarat
60 20024801 Janak Pansuria M-6 25.12.2008 C&I Manoj Mishra Gujarat
61 20024802 Bhavin Parmar M-8 29.12.2008 C&I Manoj Mishra Gujarat
62 20026133 Ajay Kumar M-10 20.07.2009 Electrical Alpeshkumar Dhamsania Other
63 20026326 Bela Bhatt M-8 15.07.2009 C&I Janak Pansuria Gujarat
64 20027333 bhavesh madhavi M-8 19.08.2009 HSE SUDHIR KUMAR SINGH Gujarat
65 20027641 Harshal Langaliya M-8 21.09.2009 Electrical Ashit Gothi Gujarat
66 20027642 Harshit Shah M-8 21.09.2009 HSE SUDHIR KUMAR SINGH Gujarat
67 20027646 Alpesh Pithwa M-8 21.09.2009 Mechanical Vasantkumar Patel Gujarat
68 20027758 Jerry Alexander M-8 05.10.2009 Operation Rohit Patel Other
69 20027764 Devkant Lande M-8 05.10.2009 Operation Suresh Kalaskar Other
70 20027938 Jemish Ladani M-8 15.10.2009 Operation Krunal Patel Gujarat
71 20027939 Santosh Thakur M-9 15.10.2009 Mechanical Hitesh Patel Other
72 20027940 Kartik Hingrajiya M-8 16.10.2009 Operation Ashok Chandna Gujarat
73 20028134 Manoj Khatri M-8 03.11.2009 Operation Ashok Chandna Gujarat
74 20028136 Jilesh Lalani M-7 04.11.2009 Operation Samirkumar Dave Gujarat
75 20028659 Vikesh Nigam M-8 20.11.2009 Operation Suresh Kalaskar Other
76 20028667 DIGVIJAYSINH Zala M-8 20.11.2009 Operation Rupak Patel Gujarat
77 20028802 Mahendra Chhatrola M-8 16.12.2009 Electrical Ashit Gothi Gujarat
78 20029165 Ravindra Patel M-7 04.01.2010 C&I Manoj Mishra Gujarat
79 20029660 Dinesh Prajapati M-7 11.01.2010 Mechanical Jayanti Kachhadiya Gujarat
80 20029661 Ashish Jani M-9 11.01.2010 Electrical Vijay H Chauhan Gujarat
81 20029801 Bhavik Shah M-8 18.01.2010 Operation Jilesh Lalani Gujarat
82 20031020 Ritesh Vyas M-7 12.04.2010 Operation Krunal Patel Gujarat
83 20031104 Rakesh Kanani M-6 19.04.2010 Mechanical Jayanti Kachhadiya Gujarat
84 20031201 Saurabh Vyas M-7 21.04.2010 Mechanical Hitesh Patel Gujarat
85 20031277 Sandip Patel M-7 27.04.2010 Mechanical Hitesh Patel Gujarat
86 20031588 Chirag Machchhar M-9 17.05.2010 Operation Rupak Patel Gujarat
87 20031852 Hrishikesh Bhatt M-9 31.05.2010 Operation Suresh Kalaskar Gujarat
88 20032052 Vimal Solanki M-9 14.06.2010 Operation Rupak Patel Gujarat
89 20032172 Hiren Undhad M-8 21.06.2010 Operation Krunal Patel Gujarat
90 20032323 Chetan Ghodasara M-8 05.07.2010 Operation Ashok Chandna Gujarat
91 20032431 Hitesh Patel M-6 12.07.2010 Mechanical Jayanti Kachhadiya Gujarat
92 20032504 Ashish Sharma M-9 15.06.2010 Operation Ashok Chandna Other
93 20032510 Shashank Shekhar M-9 15.06.2010 Operation Dipak Soni Other
94 20032624 Prahlad Sharma M-9 19.07.2010 Operation Ashok Chandna Other
95 20032625 Lalitkumar Jethwa M-5 19.07.2010 Electrical Sanjay Kumar Gupta Gujarat
96 20032947 Mahesh Paradava M-9 05.07.2010 Mechanical Rakesh Kanani Gujarat
97 20032948 Chintan Kavar M-9 05.07.2010 C&I Janak Pansuria Gujarat
98 20032956 Nikhil Vachhani M-8 02.08.2010 Power Commercial Samir Patel Gujarat
Vadinar Power Company Limited Domicile Detail of Employee as on 31.12.2016
Sr.
No.
Employee
CodeEmployee Name Level
Date Of
JoiningDept Supervisor Name Domicile
99 20033166 Apurva Tare M-8 22.07.2010 Mechanical Hitesh Patel Gujarat
100 20033183 Surbhi Chaturvedi M-9 22.07.2010 Electrical Vijay H Chauhan Other
101 20033200 Krishnakant Shah M-8 22.07.2010 Procurement Nilesh Dave Gujarat
102 20033359 Hiren Bhuva M-8 22.07.2010 Mechanical Vasantkumar Patel Gujarat
103 20033365 Madhurendra Tiwari M-8 15.07.2010 Technical Services Sanjaykumar Shah Other
104 20033597 Yuvraj Sahu M-10 05.07.2010 Operation Krunal Patel Other
105 20033627 Ashok Chandna M-7 23.08.2010 Operation Samirkumar Dave Gujarat
106 20033650 Sagar Kumar Kanjariya M-10 09.08.2010 Mechanical Hitesh Patel Gujarat
107 20033651 Jaysukh Kumar Sonagra M-10 09.08.2010 Mechanical Dinesh Prajapati Gujarat
108 20033654 Naresh Kumar Mandaliya M-10 09.08.2010 Mechanical Jayanti Kachhadiya Gujarat
109 20033655 Sagar Parmar M-10 09.08.2010 Operation Krunal Patel Gujarat
110 20033656 Kamlesh Tirthani M-10 09.08.2010 Electrical Alpeshkumar Dhamsania Gujarat
111 20033657 Jignesh Kumar Parmar M-10 09.08.2010 Operation Rohit Patel Gujarat
112 20033658 Haresh Dharajiya M-10 09.08.2010 Mechanical Rakesh Kanani Gujarat
113 20033661 Dhiral Pandya M-10 09.08.2010 Operation Jilesh Lalani Gujarat
114 20033664 Nikunj Solanki M-10 09.08.2010 Operation Rakesh Kharat Gujarat
115 20033667 Hardik Gosai M-10 09.08.2010 Operation Dipak Soni Gujarat
116 20033668 Pradip Kumar Savaliya M-10 09.08.2010 Mechanical Vasantkumar Patel Gujarat
117 20033669 Hardik Koria M-10 09.08.2010 Electrical Alpeshkumar Dhamsania Gujarat
118 20033671 Dhruvrajsinh Parmar M-10 09.08.2010 Operation Rakesh Kharat Gujarat
119 20033672 Yogesh Dave M-10 09.08.2010 Operation Jilesh Lalani Gujarat
120 20033675 Paras Bataviya M-8 09.08.2010 Mechanical Rakesh Kanani Gujarat
121 20033677 Narendra Sinh Jadeja M-10 09.08.2010 Mechanical Dinesh Prajapati Gujarat
122 20033678 Vijay Somani M-10 09.08.2010 Operation Jilesh Lalani Gujarat
123 20033679 Upendra Rathod M-10 09.08.2010 Operation Rohit Patel Gujarat
124 20033680 Kishan Anadkat M-10 09.08.2010 C&I Ketankumar Pancholi Gujarat
125 20033681 Mitesh Chavda M-10 09.08.2010 Electrical Vijay H Chauhan Gujarat
126 20034161 Chirag Prajapati M-8 20.09.2010 Operation Rakesh Kharat Gujarat
127 20034162 Jagdish Kavar M-8 20.09.2010 Electrical Vijay H Chauhan Gujarat
128 20034349 Jayanti Kachhadiya M-5 27.09.2010 Mechanical Sanjay Kumar Gupta Gujarat
129 20034350 Nilesh Motivaras M-8 27.09.2010 Electrical Ashit Gothi Gujarat
130 20034351 Nainesh Kumar Kharva M-9 27.09.2010 Mechanical Vasantkumar Patel Gujarat
131 20034372 Piyush Kukadia M-9 23.08.2010 C&I Ketankumar Pancholi Gujarat
132 20034419 Jatin Dattani M-8 23.08.2010 C&I Janak Pansuria Gujarat
133 20034782 Prafulla Kumar Mahto M-10 13.09.2010 Operation Jilesh Lalani Other
134 20034809 Anil Dabhi M-8 18.10.2010 Mechanical Dinesh Prajapati Gujarat
135 20035008 Vijay Parmar M-10 01.10.2010 IT Kantilal Makwana Gujarat
136 20035023 Ashish Kataria M-10 01.10.2010 IT Bhavesh Champaneri Gujarat
137 20035073 Mahesh Lakhatariya M-8 21.10.2010 Operation Dipak Soni Gujarat
138 20035327 Suresh Bharadwa M-8 15.11.2010 Electrical Vijay H Chauhan Gujarat
139 20035537 Rajendra Parmar M-8 13.12.2010 Mechanical Dinesh Prajapati Gujarat
140 20035949 Rohit Patel M-7 17.01.2011 Operation Samirkumar Dave Gujarat
141 20038609 Venkataraman Nagarajan M-8 11.07.2011 Technical Services Sanjaykumar Shah Other
142 20038614 Suchit Changela M-9 15.06.2011 Mechanical Hitesh Patel Gujarat
143 20038954 Prashanta Naik M-9 18.07.2011 Mechanical Rakesh Kanani Other
144 20038955 Anupam Xess M-9 18.07.2011 Mechanical Rakesh Kanani Other
145 20040875 Basant Ojha M-9 20.09.2011 Operation Rakesh Kharat Other
146 20041097 Ansar Inamdar M-10 24.09.2011 Operation Suresh Kalaskar Other
147 20041101 Bavbhai Faga M-10 24.09.2011 Operation Ashok Chandna Gujarat
Vadinar Power Company Limited Domicile Detail of Employee as on 31.12.2016
Sr.
No.
Employee
CodeEmployee Name Level
Date Of
JoiningDept Supervisor Name Domicile
148 20041105 Dilip Kidecha M-10 24.09.2011 Operation Dipak Soni Gujarat
149 20041111 Haresh Kachhela M-10 24.09.2011 Operation Jilesh Lalani Gujarat
150 20041113 Jaydip Ganatra M-10 24.09.2011 Mechanical Vasantkumar Patel Gujarat
151 20041114 Ketan Mori M-10 24.09.2011 Operation Ashok Chandna Gujarat
152 20041115 Laxman Behera M-10 24.09.2011 Operation Krunal Patel Other
153 20041117 Mahantesh Magadum M-10 24.09.2011 Mechanical Amit Morzaria Other
154 20041118 Mehul Oza M-10 24.09.2011 Operation Krunal Patel Gujarat
155 20041120 Milan Mori M-10 24.09.2011 Operation Krunal Patel Gujarat
156 20041123 Nikunj Kariya M-10 24.09.2011 Operation Jilesh Lalani Gujarat
157 20041125 Prashant Barot M-10 24.09.2011 Operation Dipak Soni Gujarat
158 20041128 Rakesh Dave M-10 24.09.2011 Operation Krunal Patel Gujarat
159 20041132 Sharad Dharasandiya M-10 24.09.2011 Mechanical Dinesh Prajapati Gujarat
160 20041141 Yogesh Tiwari M-10 24.09.2011 Mechanical Hitesh Patel Gujarat
161 20041267 Mayur Mehta M-10 15.11.2011 Mechanical Amit Morzaria Gujarat
162 20041936 Virendra Singh M-8 30.01.2012 Mechanical Dinesh Prajapati Other
163 20042095 Gurutej Nittala M-9 13.02.2012 Operation Krunal Patel Other
164 20042096 Rajendra Dadhich M-8 16.02.2012 Operation Krunal Patel Other
165 20042283 Dipak Soni M-7 01.03.2012 Operation Samirkumar Dave Gujarat
166 20042284 Rakesh Kharat M-7 01.03.2012 Operation Samirkumar Dave Gujarat
167 20042285 Suresh Kalaskar M-7 01.03.2012 Operation Samirkumar Dave Other
168 20042286 Manish Ranjan M-9 01.03.2012 Operation Jilesh Lalani Other
169 20042347 Rajendra Yadav M-8 12.03.2012 Operation Rohit Patel Other
170 20042395 Amit Prasad M-10 17.03.2012 C&I Janak Pansuria Other
171 20042544 Sreedhar Govardhanam M-9 10.04.2012 Operation Dipak Soni Other
172 20042545 Arunprasad Arivazhagan M-9 10.04.2012 Operation Rohit Patel Other
173 20045542 Shubham Suneja M-10 29.05.2013 Operation Dipak Soni Gujarat
174 20046162 Satyam Kumar M-10 02.09.2013 C&I Manoj Mishra Other
175 20046411 Shivangi Patel M-10 17.10.2013 C&I Ketankumar Pancholi Gujarat
176 20046669 SUDHIR KUMAR SINGH M-6 16.12.2013 HSE Kishor Makadia Other
177 20048619 Pranav Shukla M-11 25.09.2014 Operation Rupak Patel Gujarat
178 20048621 Ajit Sharma M-11 25.09.2014 Operation Rupak Patel Other
179 20049407 Santosh Tanwar M-8 16.02.2015 HR Admin Kishor Makadia Other
180 20049946 RajKumar Kakkad M-10 26.05.2015 Mechanical Dinesh Prajapati Gujarat
181 20049977 Hitesh Mavjibhai Dori M-11 05.06.2015 C&I Manoj Makadia Gujarat
182 20050189 Rajnish Faldu M-11 15.07.2015 Mechanical Rakesh Kanani Gujarat
183 20050377 Hardik Trivedi M-10 10.08.2015 Operation Jilesh Lalani Gujarat
184 20050621 Vipin Nigam M-9 16.09.2015 Operation Krunal Patel Gujarat
185 20051197 Asha Nimavat M-11 02.01.2016 Operation Ashok Chandna Gujarat
186 20051198 Dharmraj Dave M-7 02.01.2016 CRG Anil Vishwambharan Gujarat
187 20052811 Sasank Loya M-10 02.12.2016 Procurement Rahulvardhan Sharma Other
188 20052799 Brijesh Kachhadia M-11 28.11.2016 Operation Rohit Patel Gujarat
189 20052791 Pinak Bhalodia M-10 21.11.2016 Power Commercial Samir Patel Gujarat
190 20052797 Dolatsinh Jadeja M-11 21.11.2016 Safety Bhavesh Madhavi Gujarat
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F "
27-333G3HI333333333333333333333333333333333333-./01.2340536728 01.53508 067/3333333333333333333333333333JKLKMKNKKKOKKKP/.673G3QRSTUHVU
4WX3YZWXX3/W[R[\] 3_ S\WSa]Sbc3dXRS
�
�
�
�
�
�
�
e��fge���hefif�jk�l m�emnjmlo�g�im�p fhlgq�
����������������� �
-./01.2340536728 01.53508 067/���� � ��
rsstuvwtxyzx{|}x~�|}}x�|����twx��s�|�ts��x�}�sx{~���
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F +
������������
�����������������������������������������������������������������������������������������������������������������
�������������������������f������ �g¡�¢��¢£�����k�¤¥¦¢¤��g¡�¢§�
�����¤������ �¥¡�¢���������������������������������������������������������� �����©�������������ª�©���������������������������©������������������©��������������������«�������©�����������������ª©����������������������������������������©����������������������������������©��������������©������
�������¤¥¦¢¤��¥¡�¢���������������������������������� ������������������������������������������������������������©������������������������������ª����©���������������������ª�����������������©�����������������������������������ª����©������������������������������������������������������������������������������¬����©����������������� �����������������©����������������������������©����©�����������������������������������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F *
�h l®jm��f�i�f�
� �
�
Y 1`
Y]b\WS31`Y\R\°[
/R\] 2]±W[WS31` �� ²³´���µ �¶� ��� ²³´���µ �¶ · ��· ²³´���µ �¶ ¸ �� ²³´���µ �¶ ¹ ��¹ ²³´���µ �¶ µ ��µ ²³´���µ �¶ º ��º ²³´���µ �¶ » ��» ²³´���µ �¶ ¶ ��¶ ²³´���µ �¶ � �� ²³´���µ �¶ � ²³´���µ �¶ �� ²³´���µ �¶ � ��� ²³´���µ �¶ · ���� ²³´���µ �¶ ¸ ���· ²³´���µ �¶ ¹ ��� ²³´���µ �¶ µ ���¹ ²³´���µ �¶ º ���µ ²³´���µ �¶ » ���º ²³´���µ �¶ ¶ ·�� ²³´���µ �¶ �� ·��� ²³´���µ �¶ � ·��· ²³´���µ �¶ �� ·�� ²³´���µ �¶ �· ¸�� ²³´���µ �¶ �¸ ¸��� ²³´���µ �¶ �¹ ¸��· ²³´���µ �¶ �µ ¹�� ²³´���µ �¶ �º ¹��� ²³´���µ �¶ �» ¹��· ²³´���µ �¶ �¶ ¹�� ²³´���µ �¶ ·� ¹��¹ ²³´���µ �¶ · ¹��µ ²³´���µ �¶ ·� ¹��º ²³´���µ �¶ ·· ¹��» ²³´���µ �¶ ·¸ ¹��¶ ²³´���µ �¶ ·¹ µ�� ²³´���µ �¶ ·µ µ��� ²³´���µ �¶ ·º µ��· ²³´���µ �¶
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¼
h l®jm��f�i�f�
�
�
��� ����������´��
���������� ½� ������ ��
·» º�� ²³´���µ �¶ ·¶ º��� ²³´���µ �¶ ¸� º��· ²³´���µ �¶ ¸ º�� ²³´���µ �¶ ¸� º��¹ ²³´���µ �¶ ¸· »�� ²³´���µ �¶ ¸¸ »��� ²³´���µ �¶ ¸¹ »��· ²³´���µ �¶ ¸µ »�� ²³´���µ �¶ ¸º »��¹ ²³´���µ �¶ ¸» »��µ ²³´���µ �¶ ¸¶ »��º ²³´���µ �¶ ¹� ¶�� ²³´���µ �¶ ¹ ¶��� ²³´���µ �¶ ¹� ¶��· ²³´���µ �¶ ¹· ¶�� ²³´���µ �¶ ¹¸ ¶��¹ ²³´���µ �¶ ¹¹ ¶��µ ²³´���µ �¶ ¹µ ¶��º ²³´���µ �¶ ¹º ¶��» ²³´���µ �¶ ¹» ��� ²³´���µ �¶ ¹¶ ���� ²³´���µ �¶ µ� ���· ²³´���µ �¶ µ ��� ²³´���µ �¶ µ� ���¹ ²³´���µ �¶ µ· �� ²³´���µ �¶ µ¸ ��� ²³´���µ �¶ µ¹ ��· ²³´���µ �¶ µµ �� ²³´���µ �¶ µº ��¹ ²³´���µ �¶ µ» ��µ ²³´���µ �¶ µ¶ ��º ²³´���µ �¶ ¾" ��» ²³´���µ �¶
¾+ ��¶ ²³´���µ �¶
¾* ��� ²³´���µ �¶
¾¼ ���� ²³´���µ �¶
¾¿ ���· ²³´���µ �¶
¾À ��� ²³´���µ �¶
¾, ���¹ ²³´���µ �¶
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¿
�iÁ�j� Â�l m�jm��
ginj�m § fjl�e m
l m�jm� à e¢��¦£ÄÅ�Ʀ¢��¢£�gÄ�¥¦¤�
�� �������� ��� ���������������¸ ��· ����������������µ �� ½����������������º ��¹ �����������������» ��µ ³���� ������¶ ��º ������������������������� ��» ³�������������������������������©�����������������������· ��¶ ������������«���������©����� ��������������¸ �� ¬������������������¹ � �������½����������������������������������µ �� �����������������������������������������º gik�ÇeÈ�f�ki�jno» É g��Å�ÆÊ�£� Æ¡�f¥Æ¡¡��Ƥˤ» ��� �����������������������������������ª�» ���� �� ��������������������������������· ���· ���������������ª������������������· ��� �����������������������������· ���¹ Ì������Í�������¹� ���µ� ����³���������������·� ���º �����������������������������·� ���» ���������������������������· Î f¥Æ¡¡���¤¥¦¢¤��¤������ · ·�� �����������������Ï������·� ·��� ��������������� ���������������·� ·��· ����������������������Ð����·¹ ·�� ���������������������Ñ�������������������������·º Ò jÓÄÆ¥Ô �¢��դĥ¥¡Æ�¤��¢£�¤��ÊÆÅ�¤·º ¸�� ���Ñ����������������«�������·¶ ¸��� �����������©�����������������������·¶ ¸��· �����������«��������©��������������������¸� Ö ®�¢���Ô �¢��ÕÔ �¢¥¦×����¢£����ƢƢ�¸� ¹�� ����������������������������������������¸� ¹��� ���������������Ð�����������¸� ¹��· ½����������������������������������������� ����������������¸¹ ¹�� �������½��������������������������������������¬����¸¶ ¹��¹ �����Ñ���� �������������������¸¶ ¹��µ ³ ���������������������������Ñ������������¸¶ ¹��º ³� ���������������������¹� ¹��» ��������¹� ¹��¶ �������ÍØ�������¹ Ù l¦Ô Ô Ä¢ÆÅ��Ʀ¢¤��¢£�Ŧ¢��¦¡¹ µ�� ������������������������������������¹� µ��� Ì���������������������«�������� ¹� µ��· ½������©��������©�����©�������������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F À
�iÁ�j� Â�l m�jm��
ginj�m § fjl�e m
l m�jm�¹· gik�ÇeeÈ�il�e mf�Ú� gjki�e mf¹¸ Û iÅ�Ʀ¢¤��¢£� ¥����Ʀ¢¤¹¸ º�� ½�����������������©��������������������������������������¹µ º��� ´���������ª�������������������������������¹µ º��· Í�������������������������������������¹µ º�� ����������������������
��¹º�µ� ³������Ø�����µ º��¹ Í����������������������ªµ¹ Ü ¥����Ʀ¢�¥¡�¢¢Æ¢���¢£�Ô ¦ÝÆ¡ÆÞ��Ʀ¢�¥�¦Å�£Ä��¤µ¹ »�� ³����������������������������µµ »��� ���������������������������������������Ð������������������������µº »��· ���������������������������������µ» »�� ��������������� ����������������µ» »��¹ ��������������������������������������������µ» »��µ ������Ð��������������������������������������«�����µ» »��º Í�������������������������������������������������µ¶ ß l¦¢��¦¡�¦à�¦¥����Ʀ¢¤µ¶ ¶�� Í������������������������������Ñ�����Ø������������ �����µ¶ ¶��� á�������������������µ¶ ¶��· ½� ��Ñ���������������������������µ¶ ¶�� ����������������������«��������©������������������Ñ��µ¶ ¶��¹ ���������������������������������������������������µ¶ ¶��µ ����������������������������������������������������µ¶ ¶��º ���������������������������������������������������µ¶ ¶��» â�������������������� �����������������
������º� Ãã ���Ô Æ¢��Ʀ¢�¦à�¦¥����Ʀ¢¤º� ��� ����������������������������� ���������������������º� ���� �����������Ñ���«��������©���������©������������©���������º� ���· ��������������������������������º� ��� �� �����������º� ���¹ ½� ��Ñ��������������������������������������������º �� ä�������������������º» ��� Í� ���������������������������������º¶ ��· ½�����������������������»� �� ³�����������������������»· ��¹ ���������������������������»µ ��µ ��������������������������¶µ ��º ��������� �������������������������������¶º ��» ������������������������¶» ÃÉ ��������������������������¶¶ ��� �����������������¶¶ ���� ������������������������������� ���· �������������������� ��� ���������������������· ���¹ ½���������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ,
�������´�����
´������������³��������������� ��
��������������
�����������
���������������������
�����º ����¹� ·���¸����º �·��µ����º �����������������������º ����µ� ·���¸����º �·��µ����º ³���� �������ä��Ì�·����º ������ ·���¸����º �·��µ����º �������ä�����������Ì����������¸����º ·����·�©··©· � ·���¸����º �·��µ����º ����¹���³������������©�ä���������������������©�
ä����������������������¹����º ������ �� ·���¸����º �·��µ����º �������³������������µ����º ������¹·� ·���¸����º �·��µ����º Ì��Ñ�������������������������������������������º����º �������µ»©µ¶� ·���¸����º �·��µ����º ���������������»����º ����¹� �¸��µ����º �¸��µ����º ������������������¶����º ��������µ»� �¸��µ����º �¸��µ����º ������������������º ·�������¹�©µµ�
��µº�¸��¶����º ¸��¶����º �����¹�åá����������������©������µµå����������
��������������������������������¬�������¬�������µºå�³�����������������������
����º
³��������
�������º
�������º
������������������������������ ��������������������������������������������������������������������������������������������������������������������������������������
�����» ³�������� �������» �������» Í�����������������·����» ���������¶� �������» �������» ���������������������������¸����» ��������¸� �������» �������» �������������������������������¹����» ��������º� �������» �������» �����������������������������������������������
�������µ����» ��������� � �������» �������» ����������������Ð�����������º����» ��������� �� �������» �������» ³���������������������»����» ¸�������æ�
¸¸© ¹© »© ¶��������» �������» �äÌ������������������������������������
����µ�������µº�¶����» ���������ºº� �������» �������» ��������������½��������Í«��������á������������» �������æ�
º»©º¶��������» �������» �������������á������
�����¶ �������¶� �������¶ �������¶ ���������������������������������¶ �������� �������¶ �������¶ â�����³�����â�����������·����¶ ������ � �������¶ �������¶ ������Ð���������������������¸����¶ ·������¹����º»�
��º¶��������¶ �������¶ �������� ��á�������
�¹��� ³�������� ²����� ²����� ç�������� ��Ñ����������µ���� ³�������� ²������ ²������ ç�������� ��Ñ����������º���· ³�������� ²�����· ²�����· ��ç�������� ��Ñ���������èéêèëìí �������¶� ²�����· ²�����· ���������������������������
èîêèëìïðñòóìíôìõöñ÷øèëìï öñ÷øèëìï ùóñúûüýóþÿó���÷��ú��úñ�ó��òúóóó÷��ÿ��ñÿú÷�÷�ÿññ��ú��úÿñ�óûü�
íëêèëìõ ðñòóì��ìé�ôèïöñ÷øèëìõ öñ÷øèëìõ J ����K���N�ø����úó�óú�ô���ú�ÿ÷ñ�ó���óú�óÿþó�úÿ���ô�ÿû�ûÿ��ñ��óúñ÷�óôÿ�����ó�
�kjl kh� �l�imnjf�
��������������������������������������������������������������������������������������������������������������������������������������������� ��������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¾
�
�
����½�âá���´�������
��� � ´��� ������Ð�������������� �����������ª������� � ������ÍØ��������������©������ �������������� �Í����ÍØ���������������©�Í�����������
��������· ���������������� ��������©�Í��©���������¸ ������������������������½���� ���â�Í�����²�������������½����¹ ����������������� ������������������������������������µ ������������������ �������������¬������������©��������º ����¬���½�� ���©������������» �������������ª���� ��������������������Ì�����¶ ������������ �� ½���������������©�¬��â
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F �
iÁÁkj�ei�e mf��
��
�����½�������� ��Í���Í���Ì�³�ä��Ì�ä�ÍÌ���¬����������Ì����³�����Í�³�
������Ì�����â������ä�������������������������������������� ��³�
�������������ª��������������½��������������������������������������� ��������������Í�����������������Í���������������Ñ��Ì��������� ���������³���ä�����©����������Ì����ä�����©�������©�Í� ����� ������Ì�����������������¬�����������������������������������������������������ª����Ñ���������������Ì�����������������������������³����������³������������������������������������������������Í� �����������������������³����������������������������������Ì����������������������������������â����������������������������������������ä��������������������������������������������������������������ª�Ì��������������������������������������������������������������������������������������������������������������������������������������� ��������������������³���
Annexure 1.12: CCA compliance
CCA Compliance Report of Nayara Energy Limited AWH-81987 dtd 13/10/2016 and amended on 27/05/2017 valid till 16/09/2022
Sr No. CONDITIONS PRESENT STATUS
Specific Conditions:
Industry shall have to comply with all the conditions stipulated in the Environment Clearance, CRZ clearance and approval of Wild Life Board.
Detail Compliance reports of EC, CRZ and Wild Life clearance are submitted separately to MoEF & CC/CPCB/GPCB. Recent EC compliance has been submitted vide our letter EOL/ENV/EC compliance Report/2018/741 dated 17/05/2018. Recent CRZ and Wild Life clearance compliance has been submitted vide our letter no. Nayara Energy/ENV/Compliance report 2017-18/2018/751 dated 7th June 2018.
Applicant shall have to submit copy of approval of chief controller of explosives for storage & handling: up dated disaster management plan along with onsite & off site Emergency plans as well as periodical compliance report for 'CREP' action in respect of petroleum refinery & other guidelines/directives issued/ being issued / CPCB / DOEF / Hon’ble court from time to time.
Approval of chief controller of explosives for storage & handling have been obtained. Copy attached herewith as Annexure 1.5. Nayara Refinery Disaster Management Plan has been prepared along with onsite and offsite emergency plan. Updated ERDMP is attached herewith as Annexure 1.6. CREP compliance report is submitted 6 monthly to MoEF & CC/CPCB/GPCB. Copy attached herewith as Annexure 1.9.
Applicant shall have to carry out mock drill both onsite and offsite for all the possible eventualities at regular interval of time. For any of the disastrous situations. Escape route shall have to be predefined, properly marked and shall be brought to the knowledge of the concerned.
Mock drills are carried out as per schedule every month. Mock drill report has been attached herewith as Annexure 1.7.
Applicant shall have to obtain the ISO 14001: 2004 and ISO 18001 certification and shall have to implement the Suggestion/recommendations of the same.
We have implemented our own Refinery Integrated Management Systems (RIMS) comprising of ISO 9001 (Quality), ISO 14001 (Environment), ISO 45001(Occupational Health & Safety) & ISO 50001.
Applicant shall to prepare and implement the special oil spill contingency plan.
Oil Spill contingency plan prepared. Attached herewith as Annexure 1.11.1.
Applicant shall have to carry out the regular health check up of employee as well as of the nearby villages. For the medical services to all. 'Mobile van with medical facilities shall be provided.
Six monthly health check-up of all the employees working in hazardous area. Records shown below. Mobile Van with medical facilities has been provided to surrounding villages.
Annexure 1.12: CCA compliance
Applicant shall have to utilize low sulfur fuel as much as possible & also to install adequate storage facilities in order to minimize fugitive & air emission.
Low sulphur fuel (<1% S) - Oil and Fuel Gas is utilized within plant. Quality of Fuel Oil & Fuel Gas for the last six month is shown Table no. 01 & 02. Table no. 01: Sulphur Concentration in Wt% in Fuel Oil
Sulphur Concentration in Wt% in Fuel Oil
Sr. No.
Month Monthly Average
1 Mar 0.94 2 Apr 0.84 3 May 0.77 4 Jun 0.59 5 Jul 0.44 6 Aug 0.57
Table no. 02: H2S Concentration in mg/Nm3 in Fuel Gas.
H2S Concentration in mg/Nm3 in Fuel Gas
Sr. No.
Month Monthly Average
1 Mar 32.5
Annexure 1.12: CCA compliance
2 Apr 21.9
3 May 14.3
4 Jun 11.8
5 Jul 16.8
6 Aug 19.4
Applicant shall have to provide continuous on line monitoring facilities for the monitoring of the different pollutants.
Two Nos. of Continuous ambient air monitoring stations, Continuous emission monitoring systems in all the stacks and Continuous effluent monitoring system for treated effluent installed and hooked up with CPCB Server.
Applicant shall comply with provision of the Forest (conservation Act-1980 and Rule- 1981. The Petroleum and Minerals (pipeline acquisition of right of user land) Act-1962. CRZ notification and all Environmental Acts/Rules/Notifications and their amendments from time to time.
Refinery is complying with Forest (conservation Act-1980 and Rule- 1981 and submit 6 monthly compliance report for the Forest Clearance given vide No.8C/12/385/96 FCW, dated. 08.12.1999
Agreed.
Applicant is also required to comply with the Manufacturing, storage and Import of Hazardous Chemicals rules- 1989 framed under the Environment (protection) Act-1986.
All legal requirements of MSIHC rules are being taken
care off as per integrated management system
requirements. (Detailed compliance covered under
specific condition no. xxv in comprehensive
compliance report.)
GPCB reserves the right to stipulate additional conditions if found necNayaray. The company will implement these conditions in a time bound manner.
Agreed.
1
The Consolidated Consent and Authorization shall be valid up to 16.09.2022 for use of outlet of the discharge of the trade effluent & emission due to operation of industrial plant for Crude processing capacity 21 MMTPA for the following items/products
Complied with Production data for last six month are shown in Table no. 03:
1. LPG: 3.4 – 5.4 %Yield
2. Kero + ATF: 0 – 8.6%Yield
3. Naphtha/ MS/ Gasoline: 16.0 – 24.6 %Yield
4. HSD: 48.6 – 52.9 %Yield
5. Furnace Oil/VGO: 0 – 22.9 % Yield
6. Sulfur: 1.4 – 1.7 % Yield
7. Bitumen: 0.0 – 3.4 % Yield
8. Fuel & Loss (Refinery) 7.8 – 8.7 % Yield
9. Pet Coke 9.1 – 12.9 % yield
Annexure 1.12: CCA compliance
Table no.03: Production Data for the month of March’18 to August’18
Type of product Unit
Mar'18 Apr’18 May'18 Jun'18 Jul'18 Aug'18
LPG % Yield 4.6 4.8 4.8 4.3 4.7 4.5
% Yield % Yield 2.8 3.1 3.0 2.7 4.2 6.0
% Yield % Yield 16.8 15.9 16.6 16.8 15.9 15.7
% Yield % Yield 4.5 3.8 3.5 3.6 5.2 4.1
% Yield % Yield 52.7 53.8 52.9 51.6 52.3 50.8
% Yield % Yield 0.0 3.1 1.7 2.4 2.6 1.3
% Yield % Yield 0.0 0.0 0.0 0.0 0.0 0.0
% Yield % Yield 1.6 1.4 0.3 1.2 0.0 0.8
% Yield % Yield 1.6 1.6 1.6 1.5 1.6 1.6
% Yield % Yield 10.3 11.2 11.1 10.4 11.7 11.2
Total Production
MT/Month 95 99 95 95 98 96
Total crude Processed
MT/Month 1785294
1729837 1789717 1723994 1787021 1781148
2 CONDITIONS UNDER THE WATER ACT:
2.1 The Quantity of trade effluent from factory shall not exceed 25400 m³ / day
Actual Qty is monitored on hourly basis which is in the range of 18000 - 19000 m3/day. The Quantity of trade effluent from factory for last six month is shown in Table no. 04.
Table no. 04: The Quantity of trade effluent from factory
Sr. No. Mar’18 Apr’18 May’18 June’18 July’18 Aug’18
01
Trade
effluent,
M3/Day
16752 17872 18235 18939 19430 19266
2.2 The Quantity of sewage from factory shall not exceed 405 m³ / day
Actual Qty., 200-250 m3/day
2.3 TRADE EFFLUENT:
2.3.1 The quality of treated effluent as per GPCB norms mentioned below:
Effluent monitoring is done on daily basis. All parameters are well within limit.
Annexure 1.12: CCA compliance
Quantum limit in Kg/1,000 tonne of crude processed
for the Month of Mar’18 to Aug’18 is shown in Table
no.05:
Table no.05: Quantum limit in Kg/1,000 tonne of
crude processed
Parameter 1 Standard 2
Quantum limit in
Kg/1,000 of crude
processed
1. Oil & Grease
0.05
2. BOD 3 days, 27oC
0.15
3. COD 0.50
4. Suspended Solids
0.18
5. Phenols 0.0013
6. Sulphides 0.0047
7. CN 0.00069
8. Ammonia as N
0.07
9. TKN 0.07
10. P 0.01
11. Cr(Hexavalent)
0.00137
12. Cr(Total) 0.0001
13. Pb 0.0004
14. Hg 0.00003
15. Zn 0.00068
16. Ni 0.00145
Sr No. Parameters Limit
Kg/ MT of
crude
processed
1 pH 6-8.5
2 SS 20 mg/l 8
3 O&G 5 mg/l 2
4 Phenol 0.35 mg/l 0.14
5 Sulphides 0.5 mg/l 0.2
6 BOD (5days 20) 15 mg/l 6
7 COD 125 mg/l 50
8 Cyanides (as CN) 0.2 mg/l 0.08
9 Ammonia (as N) 15 mg/l 6
10 TKN 40 mg/l 16
11 P 3 mg/l 1.2
12 Cr(Hexavalent) 0.1 mg/l 0.04
13 Cr(Total) 2 mg/l 0.8
14 Pb 0.1 mg/l 0.04
15 Hg 0.01 mg/l 0.004
16 Zn 5 mg/l 2
17 Ni 1 mg/l 0.4
18 Cu 1 mg/l 0.4
19 V 0.2 mg/l 0.8
20 Benzene 0.1 mg/l 0.04
21Benzo (a)-
Pyrene0.2 mg/l 0.08
Annexure 1.12: CCA compliance
17. Cu 0.00090
18. V 0.0014
19. Benzene 0.00001
20. Benzo(a)-Pyrene
0.00001
2.3.2
The Refinery effluent conforming to the above standards shall be utilized for fresh water Cooling Tower and Sea Water cooling tower make - up and remaining quantity shall be used for fire water make – up, horticulture, dust suppression so as to achieve 100% recycle. The Quality of trade effluent shall not exceed 25400 kl/day
Full quantity of treated water is utilized with in refinery as fire water make - up, service water & in cooling tower make – up and Green belt.
2.3.3
The total quantity of treated waste water, R.O. Reject and Desalination plant reject of 206496 kl/day shall be returned to sea via pipeline and shall be released through diffuser at a point 220 29’ 39’’ N; 690 39’ 54” E and in a manner recommended by NIO vide their letter bearing no. NIO/B-2007/NAYARA (Salaya) dt. 31/05/2007.
Cooling tower blow down and desalination reject is discharged to sea through diffuser system designed as per NIO recommendation.
2.3.4
All the effluent treatment units shall be operated and maintained efficiently so that the treated effluent always conforms to the specifications referred in condition no. 2.3.1 above.
ETP is performing well. Stream wise analysis is done daily and is confirming to the specifications to ensure efficiency of ETP.
2.3.5
Domestic effluent generated from part of refinery shall be treated in the biological sections of ETP. Domestic effluent from Jetty shall be treated separately to conform to the standard and discharged into the Jetty.
Sewage is treated with trade effluent in secondary treatment plant meeting to GPCB limits.
BOD (5 days 20°C) <20 mg/l
SS <30 mg/l
Residual Chlorine Minimum 0.5 ppm
3 CONDITIONS UNDER THE AIR ACT:
3.1 The following shall be used as fuel: Complied Fuel quantity for last six month is shown below.
Fuel consumption, MT/hr
Mar’18
Apr’18
May’18
June'18
July'18
Aug'18
LCO/ GT FUEL/ IFO/
75.45
74.37
75.40
73.65
75.91
75.93
Fuel Type Fuel Consumption Rate
Liquid Fuel (LCO/ GT FUEL/ IFO/ HSD/ 101 MT/ Hr. LDO) / Fuel Gas
Annexure 1.12: CCA compliance
HSD/ LDO) / Fuel Gas
3.2 The applicant shall install and operate air pollution control system in order to achieve norms prescribed below:
Cyclone separator, Low NOx burners are installed to control emission
3.2.1 (a) The flue gas emission through stacks attached to Boiler/ Furnace/ Heater/ plant shall conform to the following standards:
Manual monitoring is carried out by NABL accredited third party M/s Unistar Environment and Research Labs, Vapi every month and monthly report is submitted to GPCB. Continuous Emissions monitoring analysers installed in stacks and hooked up with CPCB server
M
3.2.1
(b) The following stacks attached to boiler/ furnace/ heater shall conform to the standards referred in conditions no. 4.2.1(a)
Sr. No Stacks attached to
Stack dia. meters
Stack Height meters
1 CDU/VDU 5.7 130
2 CDU-II 3.5 100
3 NHT/CCR 5.7 130
4 DHDS 2.4 70
5 FCC Feed Heater
3.7 110
6 HMU Furnace
1.1 60
7 HMU I & II 4.7 45
8 DCU Heater I, II & III
2.5 65
9 DHDT 2.8 60
10 VGOHT 3.1 60
3.2.2 Industry shall have to vent flammable gases through the following flares
Flammable gases are vented through flare.
Sr No. Stacks Limits
Gas - 50 mg/ Nm³
Liquid - 1700 mg/ Nm³
Gas - 350 mg/ Nm³
Liquid - 450 mg/ Nm³
Gas - 10 mg/ Nm³
Liquid - 100 mg/ Nm³
Gas - 150 mg/ Nm³
Liquid - 200 mg/ Nm³
5 Nickel & Vanadium(Ni + V) Liquid - 5 mg/ Nm³
6Hydrogen Sulphide (H2S) in
Fuel GasGas - 150 mg/ Nm³
7Sulphur Content in Liquid
Fuel weight %Liquid – 1
1
2
3
4
Sulphur Dioxide (SO2)
Nitrogen Oxide(NOx)
Particulate Matter (PM)
Carbon Monoxide (CO)
Annexure 1.12: CCA compliance
Sr. No
Type of Flare
No of flare stack
Flare stack height in m
1 Hydrocarbon Base Flare
1 100
2 Hydrocarbon Expansion Flare
1 150
3 H2S Flare 1 100
4 H2S Expansion Flare
1 150
5 LPG Flare 1 65
3.2.3 (a)
(a) The process emission through various stacks / vents of reactors, process, vessel shall conform to the following standards: FCC Regenerator
Sr No.
Parameters Hydroprocess Feed (mg/Nm³)
Other than Hydroprocess feed (mg/Nm³)
1 Sulphur Dioxide
500 1700
2 Nitrogen Oxide
400 450
3 Particulate Matter
100 100
4 Carbon Monoxide
400 400
5 Ni+V 2 5 6 Opacity 30% 30%
Manual monitoring is carried out by NABL accredited third party M/s Unistar Environment and Research Labs, Vapi every month AND monthly report is submitted to GPCB Continuous Emissions monitoring analysers installed in stacks and hooked up with CPCB server
3.2.3 (b)
(b) Sulphur Recovery Units Sr. No
Parameter Permissible Limit
1 Sulphur recovery 98.7% 2 H2S 15 mg/ Nm3
3 Nitrogen Oxide 350 mg/ Nm3 4 Carbon Monoxide 150 mg/ Nm3
(c)
Manual monitoring is carried out by NABL accredited third party M/s Unistar Environment and Research Labs, Vapi every month AND monthly report is submitted to GPCB.
Continuous Emissions monitoring analysers installed in stacks and hooked up with CPCB server
Annexure 1.12: CCA compliance
3.2.4
(b) The following emission stacks/ vent of reactors, process and vessel shall conform to the standards referred in condition no. 3.2.3 (a)
Sr No. Stack attached to Height (mt)
1 FCC Regenerator 110
2 SRU 80
Noted and agreed
3.2.5
The concentration of the parameters in the ambient air within the premises of the industry shall not exceed the limits specified in NATIONAL AMBIENT AIR QUALITY STANDARDS – E(P)A Seventh Amendment Rules – 2009 , as mentioned below,
Manual monitoring is carried out by NABL accredited third party M/s Unistar Environment and Research Labs, Vapi weekly once at four locations upwind, downwind and two cross winds and monthly report is submitted to GPCB. Two Continuous ambient air quality monitoring stations set up and hooked up with CPCB server
3.2.6 For all combustion processes either sulphur free or desulfurized fuel shall be used.
Desulphurized fuel is being used.
3.2.7
Low NOx burners and/or De NOx system shall be incorporated for controlling NO2 into atmosphere. The residual NOx emission shall be in such a way that it will be dispersed effectively before reaching ground level.
Low NOx Burners are installed in all stacks
3.3
The application shall provide portholes, ladder, platform etc at chimney(s) for monitoring the air emissions and the same shall be open for inspection to/and for use of Board’s staff. The chimney(s) vents attached to various sources of emission shall be designed by numbers such S-1, S-2 etc. and these shall be painted/displayed to facilitate identification.
Portholes, ladder, platform etc at chimney(s) for monitoring the air emissions is provided. The chimney(s) vents attached to various sources of emission has been designed by numbers such S-1, S-2 etc. and these are painted/displayed to facilitate identification.
3.4
The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75 B (A) during day time and 70 dB (A) during night time. Daytime is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.
The industry has taken adequate measures for control of noise levels source within the premises so as to maintain ambient air quality standards.
However to ensure compliance with the standard
noise levels are monitored during day and night in the
Sr.
NoPollutant
Time
weighted
average
Concentration
in ambient air
Annual 50
24 Hrs 80
Annual 40
24 Hrs 80
Annual 60
24 Hrs 100
Annual 40
24 Hrs 60
8 Hrs 2
1 Hr 4
6 Benzene (C6H6) µg/m³ Annual 5
7Banzo (a) Pyrene (BaP) particulate
phase only, µg/m³Annual 1
5 Carbon Monoxide (CO) mg/Nm³
Nitrogen Dioxide( NO2)µg/m³
1 Sulphur Dioxide( SO2) µg/m³
2
3Particulate matter(size less than
10 ppm) or PM 10 µg/m³
4Particulate matter(size less than
2.5 ppm) or PM 2.5 µg/m³
Annexure 1.12: CCA compliance
periphery of refinery. Monitoring results are as given
below.
Period: Mar’18 to Aug’18
Locations
Noise Level, dB(A)
during Day Time
06:00 am to 10:00 pm
Noise Level, dB(A) during Night
Time
10:00 pm to 06:00 am
Ambient Station at Port A Camp1 50 - 53 49 - 51
Ambient Station at Labour Gate1 52 - 53 50 - 52
Ambient Station at West side of Main Flare1 49 - 52 47 - 50
Nr. Batching Plant 52 - 53 51
Ambient Station at 93 Gate 50 - 52 49 - 51
Storm water drain outlet 51 - 54 50 - 52
Ambient Station at Refinery Main Gate1 51 - 52 49 - 51
Nayara Petrol Pump (Near Delhi Darbar) 51 - 55 50 - 53
Ambient Station at Pet Coke Rail Loading
Yard
51 - 52 48 - 50
Ambient Air Quality standards in terms of
Noise for industrial area
75 dB(A) 70 dB(A)
3.5
Industry shall have to comply with EIA Notification No – SO 1533(E) dated 14th Sept – 2006 and its amendment issued from time to time by Ministry of Environment and Forest Govt. of India, New Delhi. Industry shall comply all the conditions stipulated in obtained Environmental Clearance
We are complying with EIA Notification, dated 14th Sept – 2006 and its amendment issued from time to time by Ministry of Environment and Forest.
3.6
The industry shall comply all conditions issued by Ministry of Environment and Forest, GOI, New Delhi in their environmental clearance issued time to time and any directions issued from time to time. Regular compliance of it shall be submitted half yearly to this Board.
6 monthly compliance report of conditions given in the clearance is submitted 6 monthly to MoEF &CC, CPCB and GPCB.
Annexure 1.12: CCA compliance
3.7
The applicant shall also comply with all standards/ notes etc. mentioned under GSR 186(E) dt. 18/03/2008 issued viz. notes for effluent, emissions, FCC Regenerators, Sulfur Recovery Units as wells as standards/guidelines etc. under part c entitled fugitive emission, storage of volatile liquid: Benzene storage, solvent for lube-base oil production (furfural, MEK, Toluene and MIBK); standards for equipment leaks; emission standards for VOC from waste water collection and treatment. You are directed to comply these conditions judiciously and send reports about the action taken regularly to this office.
We are complying with GSR 186(E) dt. 18/03/2008 for effluent, emissions, FCC Regenerators, Sulphur Recovery Units as wells as standards/guidelines. Detailed compliance is given as Annexure-4.
4 CONDITIONS UNDER THE HAZARDOUS & OTHER WASTES (MANAGEMENT AND TRANSBOUNDARY MOVEMENT) RULES, 2016
4.1
The authorization is granted for the following hazardous waste, its quantity and mode of handling & disposal:
Sr. No.
Description of Wastes
Schedule - I
Quantity per Year
Mode of Handling & Disposal
1 Oily Sludge from ETP
35.3 13000 MT
Collection, Storage, Transportation and disposal through TSDF/ Incineration / actual users / Co-processing in Delayed Coker Unit (DCU)
2 Slop Oil 4.3 120000 MT
Collection, Storage and Recycle within the Plant
3 Oily rags/ Oil
5.2 5000 MT Collection, Storage, Transportation and
The hazardous wastes authorized for generation in the unit are well within the authorized quantity and disposed as per the mode in CC&A.
Annexure 1.12: CCA compliance
contaminated waste
disposal through TSDF/ Incineration / actual users /
4 Used Lubricating Oil
5.1 300 MT Collection, storage, transportation and siposal by selling it to registered re-refiner units
5 Oily Sludge & BSW
4.1 5000 MT Collection, Storage, Transportation and disposal through TSDF/ Incineration / actual users / Co-processing in Delayed Coker Unit (DCU)
6 Spent Catalyst from Various Units
4.2 8000 MT Collection, Storage, Transportation & Disposal through actual users / TSDF/ Incineration
7 Contaminated cotton rags or other
33.2 155 MT Collection, Storage, Transportation &
Annexure 1.12: CCA compliance
cleaning materails
Disposal through actual users / TSDF/ Incineration
8 Discarded Empty Drums/ Containers
33.1 50000 Nos
Collection, Storage, Transportation & Disposal through actual users
9 Spent Resin Waste
35.2 15 MT Collection, Storage, Transportation and disposal through TSDF/ Incineration / actual users
10 Insulated copper wire scrap/ copper with PVC sheathing cable
IV/7 200 MT Collection, storage and disposal by selling it to registered recycler, reprocessor/ actual user
11 Lead Acid Battery Waste
- 10 MT Collection, Storage, Transportation & Disposal through actual users
Annexure 1.12: CCA compliance
12 Expired Hazardous Chemicals
II/ E3 100 MT Collection, Storage, Transportation and disposal through TSDF/ Incineration / actual users
13 Spent Carbon
36.2 200 MT Collection, Storage, Transportation and disposal through TSDF/ Incineration / actual users/ incineration in power plant boilers
14 e- waste - 20 MT Collection, storage and disposal by through actual user/ registered recycler
15 Waste Coke II- Class A-70
100 MT Collection, storage and disposal by through actual user
16 Spent Catalysts and Molecular Sieves
1.6 100 MT Collection, Storage, Transportation and disposal
Annexure 1.12: CCA compliance
through TSDF/ Incineration / actual users
4.2 You shall keep complete records of the types, quantities and characteristics of hazardous waste and its management from collection to ultimate disposal.
Inventory management sheet having the details of hazardous wastes generated in the Refinery is maintained and also uploaded in the monthly patrak of GPCB XGN site.
4.3
Storage site will be prepared and maintained as follows:-
a. Storage site will have sufficient capacity for storage of solid hazardous waste impervious lining having four- side adequate boundary protection.
Two nos. of Hazardous waste storage shed with 11600 m2 area with HDPE linear facility and have dedicated 3 no. of sludge drying pit with 3000 m3 capacity each
b. A Leachate collection and drainage line at all storage sites shall be provided and connected to the inlet of Effluent treatment plant for treatment.
Leachate collection system has been provided in all sludge storage pits, which is connected to Expansion ETP for sending Leachate for treatment.
c. Additional precautions shall be taken to prevent surface runoff through waste body during monsoon.
Additional precautions has been taken to prevent surface runoff during monsoon.
4.4 Unit shall explore the possibilities of waste minimization, avoidance, reuse, recycling etc. and submit the complete plan for approval of GPCB.
Unit has succeeded in projects like reusing Spent Carbon and Oily Sludge inside the Refinery. Also we have applied and received consent for reusing Spent Carbon in Power Plant Boilers. Reprocessing Oily Sludge in DCU.
4.5 The waste generator shall be totally responsible for collection, storage, transportation and ultimate disposal of the wastes generated
We have a dedicated Waste Management Procedure which is strictly followed in our Refinery for proper management of wastes.
4.6
Waste after required treatment shall be stored with due care that in no case any waste shall be released from this site into Environment causing surface water or underground water or soil pollution.
No waste is being treated in Refinery. All the wastes are reused, sold to SPCB authorized recyclers or sent to GPCB authorized TSDF Site.
4.7 In no case waste shall be disposed off on land, within or outside factory premises, sold out to traders/dealers or transferred, without prior approval of the Board.
All the wastes are reused, sold to SPCB authorized recyclers or sent to GPCB authorized TSDF Site.
4.8 At the storage site, “Hazardous Waste Storage Site” & “Danger” signboards shall be provided with all safety devices.
Boards have been provided with danger sign as well as with the details of the wastes stored in the site at the Hazardous Waste storage sheds and Pits.
4.9 Each type of waste shall be stored in a separate storage cell. In no case more than one waste shall be stored in one cell.
All the wastes generated are stored in separate dedicated cells provided at Hazardous Waste Storage Site.
4.10 Post storage monitoring shall be regularly carried out and report of the same shall be submitted to GPCB
It is not applicable as NAYARA’s is not TSDF Site.
Annexure 1.12: CCA compliance
4.11
The occupier may store the hazardous waste for a period not exceeding 90 days and shall maintain the records of sale, transfer, storage, recycling and reprocessing of such waste and make these records available for inspection. GPCB may extend the said period under certain conditions specified in the Hazardous and other Wastes( Management, and Transboundary Movement ) Rules - 2016
Noted
4.12 The storage area shall have appropriate containment system as described in Guideline prepared by M.O.E.F. Government of India.
It is not applicable as NAYARA’s is not TSDF Site.
4.13 During all above activities, due care shall be taken to avoid any leakage or release of hazardous waste into environment.
It is not applicable as NAYARA’s is not TSDF Site.
4.14 Preparation of containers it’s total No. Map of storage site nearby activity etc. shall be maintained and submitted to GPCB.
It is not applicable as NAYARA’s is not TSDF Site.
4.15 Emergency plan shall be prepared for storage site of Hazardous waste and submitted to GPCB, Gandhinagar.
It is not applicable as NAYARA’s is not TSDF Site.
4.16 The generator shall not offer his hazardous waste to transportation and to disposal facilities that have not been authorized by Gujarat Pollution Control Board.
All the wastes are reused, sold to SPCB authorized recyclers or sent to GPCB authorized TSDF Site.
4.17
The generator, occupier, transporter and operator of the TSDF facility shall comply with the directives specified by MOEF, Govt. of India, under the Hazardous and other Wastes( Management, and Transboundary Movement ) Rules - 2016
It is not applicable as NAYARA’s is not TSDF Site.
4.18
For transportation of waste the generator & transporter shall ensure that the hazardous wastes are collected and packed separately as per characteristic wise category wise in such type of suitable container that it does not react with the wastes.
Reactivity of the wastes is studied and then it is properly packed and sent in suitable packaging material to SPCB authorized recyclers or sent to GPCB authorized TSDF Site.
4.19 During transportation container shall be closed from all the sides except at the time of removal of wastes.
While transportation all the trucks are covered with tarpaulin to ensure no spillage of wastes
4.20 Hazardous waste shall be packaged and labelled as per guidelines issued by Central Pollution Control Board from time to time.
All the wastes except oily sludge are packed in drums/ jumbo bags and labelled as per the guidelines.
4.21 Sludge shall be dewatered before packing into containers. Oily Sludge from ETP is being sent for reprocessing to DCU. Oily Sludge and BSW from the storage tanks are dewatered and then stored in Containers.
4.22 Each container shall be inspected at least once in a week for any leakages or spillage problem
Each container/ bags are inspected regularly
4.23 The transporter shall be given relevant information in Form -9 (TREMCARD).
Complied with :TREMCARD is being provided to transporter during the time of disposal
4.24 Transporter driver and person handling Hazardous waste shall be trained and drivers shall be educated/ trained properly.
Tool Box Talk given to persons and drivers handling hazardous wastes
Annexure 1.12: CCA compliance
4.25 A copy of TREMCARD shall be forwarded before operation carried out to the Gujarat Pollution Control Board, Gandhinagar
It is not applicable as NAYARA is not the transporter
4.26 Transporter shall be given all safety devices like goggles, gloves, mask, fire extinguisher, gumboots etc.
It is not applicable as NAYARA is not the transporter
4.27 Vehicles, which are proposed to be used for transportation, shall be registered under Motor Vehicle Act.
It is not applicable as NAYARA is not the transporter
4.28
During transportation activity packing material and containers shall be such that there shall be no significant chemical and galvanic reaction among any of the material in package.
Each container/ bags is inspected and ensured that there will not be any reaction or leakage while transporting
4.29 Labelling and marking on containers of the Hazardous waste and whole transportation operation shall be as per Motor Vehicles Rules’89.
It is not applicable as NAYARA is not the transporter
4.30 Due care shall be taken during transportation to avoid leakages or spillage.
It is not applicable as NAYARA is not the transporter
4.31 Emergency plan shall be prepared for transportation activity.
It is not applicable as NAYARA is not the transporter
4.32 Source of waste generation and final destination of disposal place shall be informed to GPCB, Regional Office in that Area.
Manifest is prepared and sent yearly, also monthly patrak is filled monthly to make aware of the generation and disposal of wastes
4.33 Transporter shall dispose Hazardous waste only at authorized cell of notified disposal facility located at your own secured landfill site.
It is not applicable as NAYARA is not the transporter
4.34 The transporter shall be responsible for taking appropriate steps to clean up spillage, which may occur during transit as specified in TREMCARD
It is not applicable as NAYARA is not the transporter
4.35 In case, of an accident or spillage of hazardous waste during transit report in Form-11 shall be made to GPCB, Gandhinagar with a copy to Regional Office.
Till date there has not been any incident while transportation of wastes. However, in case of any incident we will give the report in Form- 11 to GPCB, Gandhinagar as well as Regional Office
4.36 A contingency plan shall be prepared and made known to the transporter for emergency action.
TREM CARD provided to transporter to handle any emergency situation
4.37
The generator/occupier or operator of facility or transporter shall prepare a manifest and shall forward copy to each other and also to the Regional office of GPCB in such a way that one can assure that Hazardous Waste is properly transported and disposed.
Manifest is prepared and procedure is followed while disposal and transportation of wastes
4.38 The generator/an occupier/ operator of the facility or transporter shall prepare a manifest, which shall consist of six copies in different colors.
Six copies of manifest are prepared and given to concern facility while transport and disposal of wastes
4.39 The color codes and the movement of the manifest shall be as per the guidelines prepared by MOEF, Government of India
Manifest prepared and given to the concern as per the guidelines issued by MoEF&CC
Annexure 1.12: CCA compliance
4.40
In case of any change in process, product, mode of management of any waste generated other than specified in the application and correspondence, the applicant shall approach to the board with fresh application and requisite fee.
Noted
4.41 The fresh application shall be made in Form 1 before expiry of authorization validity period.
Noted.
4.42 Records of waste generation and its management shall be maintained in Form – 3 and annual return shall be submitted to GPCB in Form – 4.
Form -4 is submitted every year to GPCB before 30th June. Records of waste are maintained in Form-3 format.
4.43 In case of any accident, details of the same shall be submitted in Form – 11 to GPCB
Till date there has not been any incident while transportation of wastes. However, in case of any incident we will give the report in Form- 11 to GPCB, Gandhinagar as well as Regional Office
4.44 As per “Public liability Insurance Act – 91” company shall get Insurance policy, if applicable.
We have PLI policy vide letter No. OG-18-1919-3304-00000033,dated.21.09.2018,which is valid till 21.09.2019
4.45
Empty drums and containers of toxic and hazards material shall be treated as per guideline published for “management & handling of discarded containers”. Records of the same shall be maintained and forwarded to GPCB regularly.
Empty contaminated drums are being sold to GPCB approved recycler.
4.46 In no case any kind of solid waste shall be imported without prior approval of appropriate authority.
No wastes have been imported or exported till date at our site and same will be complied in future.
5.00 GENERAL CONDITIONS
5.1 Any change in personnel, equipment or working conditions as mentioned in the consents form/ order should immediately be intimated to this Board.
Noted
5.2 Applicants shall also comply with the general conditions given in Annexure – I
We are complying with the conditions given in Annexure-I
5.3
Industry shall have to display the relevant information with regard to Hazardous waste as indicated in the Hon’ble Supreme court order in W.P. No.657 of 1995 dated 14th October 2003.
Noted
5.4
Industry shall have to display on-line data outside the main factory gate with regard to quantity and nature of hazardous chemicals being handled in the plant, including waste water and air emissions and solid hazardous waste generated within the factory premises.
Noted
5.5
The applicant shall have at his cost get samples of emission collected and analyzed from an approved laboratory once in a month for the parameters indicated in condition 3 and 4 and shall submit in duplicate the report there of to the Board by the 10th of the succeeding month. The applicant shall also maintain records of the analytical results properly and shall keep these records/ charts open for inspection.
Third party M/s Unistar Environment and Research Labs, Vapi accredited by NABL has been given contract for this year for monitoring and the monthly monitoring report is submitted to GPCB.
Annexure 1.13: Details of Laboratories with employee list
List of Laboratory Instruments
Sr. No. Instrument Details Make
1 Analytical Balance Shimadzu
2 Auto Titrators Mettler
3 BOD Incubator HACH
4 BOD Track HACH
5 COD Reactor (Duel block) HACH
6 Conductivity Meter HACH
7 DO meter HACH
8 IC (Ion Chromatography) Dionex
9 Microwave Furnace CEM
10 Millipore system Millipore
11 Oven Bio Tech India Ltd.
12 pH meter Thermo Scientific
13 TOC Analyser Shimadzu
14 Turbidity Meter HACH
15 UV VIS Spectrophotometer Perkin Elmer/Shimadzu
16 Visible spectrophotometer HACH
17 Atomic Absorbtion Spectrophotometer
Perkin Elmer
18 GC - (RGA) Perkin Elmer
19 GC - DHA (PAC) Agilent
20 GC - Hi Speed RGA Agilent
21 GC - Low Oxygenates Perkin Elmer
22 GC - Methaniser Perkin Elmer
23 GC - PIONA - Reformulyzer Agilent
24 GC - Simdist Perkin Elmer
25 GC-ASTM 4420 Agilent
26 GC-ASTM 5580 Agilent
27 GC-MS for Lo-oxigenates & FEM Agilent
28 GC-SCD (Sulfur Chemiluminance detector
Agilent
29 HPLC Perkin Elmer
30 ICP Analyser Perkin Elmer
31 ICP-MS Analyser THERMO FISHER SCINTIFIC
32 Mercury analyzer ( PE-1 ) NIC
33 Spectroil Q_100 Spectro Scientific
Annexure 1.13: Details of Laboratories with employee list
List of Employees:
St No
Emp Code
Emp Name Cadre / Level
Qualification
1 20008207 Pradeep Prabhu M-3 PHD 2 20004678 Ketankumar Patel M-5 BSc 3 20004967 Dhiraj Gondaliya M-5 MSc 4 20005391 Narhar Deshpande M-5 MSc 5 20010321 Anil Patil M-5 PHD 6 20001404 Hitesh Sojitra M-6 MSc 7 20004549 Harish Lalani M-7 MSc 8 20008156 Shailesh Chhatrala M-7 MSc 9 20009741 Mohan Satyadev M-7 MSc
10 20021910 Atul Dave M-7 MSc 11 20002295 Divyesh Desai M-8 BSc 12 20004818 Hiren Dave M-8 MSc
13 20007702 Ambrishkumar
Kachhia M-8
MSc 14 20021240 Girish Thanki M-8 MSc 15 20021963 Brijesh Bhuva M-8 MSc 16 20005906 Padmesh Shah M-9 MSc 17 20006936 Mithun Dave M-9 MSc 18 20007775 Manish Joshi M-9 Diploma, bsc 19 20009567 Ashok Maghodiya M-9 BSc 20 20011782 Ashish Dhamsania M-9 MSc 21 20012043 Rajesh Butani M-9 MSc 22 20012055 Satish Bhalodia M-9 BSc 23 20012150 Paresh Rana M-9 BSc 24 20013886 Jasmin Vora M-9 MSc 25 20014100 Shailesh Gadhvi M-9 MSc 26 20014455 Gajera Naresh M-9 MSc 27 20032157 Bhaumik Kaneria M-9 MSc 28 20032158 Tushar Patel M-9 MSc 29 20033981 Kaushikkumar Patel M-9 BSc 30 20035533 Kinjal Patel M-9 BSc 31 20053551 Harshal Modi M-9 MSc 32 20021369 Mayur Joshi M-10 BSc 33 20032964 Milan Nathwani M-10 MSc 34 20033431 Hardik Trivedi M-10 BSc 35 20033705 Gunvanti Panchal M-10 BSc
36
20033879 Arpan Shah M-10 Post Diploma Course-2000,BSc-2000,
37 20033982 Mayur Talpara M-10 MSc 38 20033983 Mahesh Jesadiya M-10 MSc 39 20033984 Girish Trala M-10 MSc 40 20033985 Pankaj Tilva M-10 MSc 41 20033986 Jayesh Kamani M-10 MSc 42 20034806 Dharmesh Bhuva M-10 MSc 43 20035142 Rahul Rakholiya M-10 MSc
Annexure 1.13: Details of Laboratories with employee list
44 20053151 Angrej Singh M-10 BSc 45 20053157 Tejas Trivedi M-10 MSc 46 20053150 Paresh Bhatt M-11 MSc 47 20053152 Gautam Rana M-11 BSc 48 20053153 Kishan Kapuriya M-11 MSc 49 20053156 Chintan Patel M-11 MSc 50 20053232 Rahul Patel M-11 MSc 51 20053268 Chetan Busa M-11 MSc 52 20053411 Suresh Modhavadiya M-11 MSc
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F "
27-333G3HI333333333333333333333333333333333333-./01.2340536728 01.53508 067/3333333333333333333333333333JKLKMKNKKKOKKKP/.673G3QRSTUHVU
4WX3YZWXX3/W[R[\] 3_ S\WSa]Sbc3dXRS
�
�
�
�
�
�
�
e��fge���hefif�jk�l m�emnjmlo�g�im�p fhlgq�
����������������� �
-./01.2340536728 01.53508 067/���� � ��
Annexure 1.14 Oil Spill Contigency Plan
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F +
������������
�����������������������������������������������������������������������������������������������������������������
�������������������������f������ �g¡�¢��¢£�����k�¤¥¦¢¤��g¡�¢§�
�����¤������ �¥¡�¢���������������������������������������������������������� �����©�������������ª�©���������������������������©������������������©��������������������«�������©�����������������ª©����������������������������������������©����������������������������������©��������������©������
�������¤¥¦¢¤��¥¡�¢���������������������������������� ������������������������������������������������������������©������������������������������ª����©���������������������ª�����������������©�����������������������������������ª����©������������������������������������������������������������������������������¬����©����������������� �����������������©����������������������������©����©�����������������������������������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F *
�h l®jm��f�i�f�
� �
�
Y 1`
Y]b\WS31`Y\R\°[
/R\] 2]±W[WS31` �� ²³´���µ �¶� ��� ²³´���µ �¶ · ��· ²³´���µ �¶ ¸ �� ²³´���µ �¶ ¹ ��¹ ²³´���µ �¶ µ ��µ ²³´���µ �¶ º ��º ²³´���µ �¶ » ��» ²³´���µ �¶ ¶ ��¶ ²³´���µ �¶ � �� ²³´���µ �¶ � ²³´���µ �¶ �� ²³´���µ �¶ � ��� ²³´���µ �¶ · ���� ²³´���µ �¶ ¸ ���· ²³´���µ �¶ ¹ ��� ²³´���µ �¶ µ ���¹ ²³´���µ �¶ º ���µ ²³´���µ �¶ » ���º ²³´���µ �¶ ¶ ·�� ²³´���µ �¶ �� ·��� ²³´���µ �¶ � ·��· ²³´���µ �¶ �� ·�� ²³´���µ �¶ �· ¸�� ²³´���µ �¶ �¸ ¸��� ²³´���µ �¶ �¹ ¸��· ²³´���µ �¶ �µ ¹�� ²³´���µ �¶ �º ¹��� ²³´���µ �¶ �» ¹��· ²³´���µ �¶ �¶ ¹�� ²³´���µ �¶ ·� ¹��¹ ²³´���µ �¶ · ¹��µ ²³´���µ �¶ ·� ¹��º ²³´���µ �¶ ·· ¹��» ²³´���µ �¶ ·¸ ¹��¶ ²³´���µ �¶ ·¹ µ�� ²³´���µ �¶ ·µ µ��� ²³´���µ �¶ ·º µ��· ²³´���µ �¶
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¼
h l®jm��f�i�f�
�
�
��� ����������´��
���������� ½� ������ ��
·» º�� ²³´���µ �¶ ·¶ º��� ²³´���µ �¶ ¸� º��· ²³´���µ �¶ ¸ º�� ²³´���µ �¶ ¸� º��¹ ²³´���µ �¶ ¸· »�� ²³´���µ �¶ ¸¸ »��� ²³´���µ �¶ ¸¹ »��· ²³´���µ �¶ ¸µ »�� ²³´���µ �¶ ¸º »��¹ ²³´���µ �¶ ¸» »��µ ²³´���µ �¶ ¸¶ »��º ²³´���µ �¶ ¹� ¶�� ²³´���µ �¶ ¹ ¶��� ²³´���µ �¶ ¹� ¶��· ²³´���µ �¶ ¹· ¶�� ²³´���µ �¶ ¹¸ ¶��¹ ²³´���µ �¶ ¹¹ ¶��µ ²³´���µ �¶ ¹µ ¶��º ²³´���µ �¶ ¹º ¶��» ²³´���µ �¶ ¹» ��� ²³´���µ �¶ ¹¶ ���� ²³´���µ �¶ µ� ���· ²³´���µ �¶ µ ��� ²³´���µ �¶ µ� ���¹ ²³´���µ �¶ µ· �� ²³´���µ �¶ µ¸ ��� ²³´���µ �¶ µ¹ ��· ²³´���µ �¶ µµ �� ²³´���µ �¶ µº ��¹ ²³´���µ �¶ µ» ��µ ²³´���µ �¶ µ¶ ��º ²³´���µ �¶ ¾" ��» ²³´���µ �¶
¾+ ��¶ ²³´���µ �¶
¾* ��� ²³´���µ �¶
¾¼ ���� ²³´���µ �¶
¾¿ ���· ²³´���µ �¶
¾À ��� ²³´���µ �¶
¾, ���¹ ²³´���µ �¶
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¿
�iÁ�j� Â�l m�jm��
ginj�m § fjl�e m
l m�jm� à e¢��¦£ÄÅ�Ʀ¢��¢£�gÄ�¥¦¤�
�� �������� ��� ���������������¸ ��· ����������������µ �� ½����������������º ��¹ �����������������» ��µ ³���� ������¶ ��º ������������������������� ��» ³�������������������������������©�����������������������· ��¶ ������������«���������©����� ��������������¸ �� ¬������������������¹ � �������½����������������������������������µ �� �����������������������������������������º gik�ÇeÈ�f�ki�jno» É g��Å�ÆÊ�£� Æ¡�f¥Æ¡¡��Ƥˤ» ��� �����������������������������������ª�» ���� �� ��������������������������������· ���· ���������������ª������������������· ��� �����������������������������· ���¹ Ì������Í�������¹� ���µ� ����³���������������·� ���º �����������������������������·� ���» ���������������������������· Î f¥Æ¡¡���¤¥¦¢¤��¤������ · ·�� �����������������Ï������·� ·��� ��������������� ���������������·� ·��· ����������������������Ð����·¹ ·�� ���������������������Ñ�������������������������·º Ò jÓÄÆ¥Ô �¢��դĥ¥¡Æ�¤��¢£�¤��ÊÆÅ�¤·º ¸�� ���Ñ����������������«�������·¶ ¸��� �����������©�����������������������·¶ ¸��· �����������«��������©��������������������¸� Ö ®�¢���Ô �¢��ÕÔ �¢¥¦×����¢£����ƢƢ�¸� ¹�� ����������������������������������������¸� ¹��� ���������������Ð�����������¸� ¹��· ½����������������������������������������� ����������������¸¹ ¹�� �������½��������������������������������������¬����¸¶ ¹��¹ �����Ñ���� �������������������¸¶ ¹��µ ³ ���������������������������Ñ������������¸¶ ¹��º ³� ���������������������¹� ¹��» ��������¹� ¹��¶ �������ÍØ�������¹ Ù l¦Ô Ô Ä¢ÆÅ��Ʀ¢¤��¢£�Ŧ¢��¦¡¹ µ�� ������������������������������������¹� µ��� Ì���������������������«�������� ¹� µ��· ½������©��������©�����©�������������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F À
�iÁ�j� Â�l m�jm��
ginj�m § fjl�e m
l m�jm�¹· gik�ÇeeÈ�il�e mf�Ú� gjki�e mf¹¸ Û iÅ�Ʀ¢¤��¢£� ¥����Ʀ¢¤¹¸ º�� ½�����������������©��������������������������������������¹µ º��� ´���������ª�������������������������������¹µ º��· Í�������������������������������������¹µ º�� ����������������������
��¹º�µ� ³������Ø�����µ º��¹ Í����������������������ªµ¹ Ü ¥����Ʀ¢�¥¡�¢¢Æ¢���¢£�Ô ¦ÝÆ¡ÆÞ��Ʀ¢�¥�¦Å�£Ä��¤µ¹ »�� ³����������������������������µµ »��� ���������������������������������������Ð������������������������µº »��· ���������������������������������µ» »�� ��������������� ����������������µ» »��¹ ��������������������������������������������µ» »��µ ������Ð��������������������������������������«�����µ» »��º Í�������������������������������������������������µ¶ ß l¦¢��¦¡�¦à�¦¥����Ʀ¢¤µ¶ ¶�� Í������������������������������Ñ�����Ø������������ �����µ¶ ¶��� á�������������������µ¶ ¶��· ½� ��Ñ���������������������������µ¶ ¶�� ����������������������«��������©������������������Ñ��µ¶ ¶��¹ ���������������������������������������������������µ¶ ¶��µ ����������������������������������������������������µ¶ ¶��º ���������������������������������������������������µ¶ ¶��» â�������������������� �����������������
������º� Ãã ���Ô Æ¢��Ʀ¢�¦à�¦¥����Ʀ¢¤º� ��� ����������������������������� ���������������������º� ���� �����������Ñ���«��������©���������©������������©���������º� ���· ��������������������������������º� ��� �� �����������º� ���¹ ½� ��Ñ��������������������������������������������º �� ä�������������������º» ��� Í� ���������������������������������º¶ ��· ½�����������������������»� �� ³�����������������������»· ��¹ ���������������������������»µ ��µ ��������������������������¶µ ��º ��������� �������������������������������¶º ��» ������������������������¶» ÃÉ ��������������������������¶¶ ��� �����������������¶¶ ���� ������������������������������� ���· �������������������� ��� ���������������������· ���¹ ½���������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ,
�������´�����
´������������³��������������� ��
��������������
�����������
���������������������
�����º ����¹� ·���¸����º �·��µ����º �����������������������º ����µ� ·���¸����º �·��µ����º ³���� �������ä��Ì�·����º ������ ·���¸����º �·��µ����º �������ä�����������Ì����������¸����º ·����·�©··©· � ·���¸����º �·��µ����º ����¹���³������������©�ä���������������������©�
ä����������������������¹����º ������ �� ·���¸����º �·��µ����º �������³������������µ����º ������¹·� ·���¸����º �·��µ����º Ì��Ñ�������������������������������������������º����º �������µ»©µ¶� ·���¸����º �·��µ����º ���������������»����º ����¹� �¸��µ����º �¸��µ����º ������������������¶����º ��������µ»� �¸��µ����º �¸��µ����º ������������������º ·�������¹�©µµ�
��µº�¸��¶����º ¸��¶����º �����¹�åá����������������©������µµå����������
��������������������������������¬�������¬�������µºå�³�����������������������
����º
³��������
�������º
�������º
������������������������������ ��������������������������������������������������������������������������������������������������������������������������������������
�����» ³�������� �������» �������» Í�����������������·����» ���������¶� �������» �������» ���������������������������¸����» ��������¸� �������» �������» �������������������������������¹����» ��������º� �������» �������» �����������������������������������������������
�������µ����» ��������� � �������» �������» ����������������Ð�����������º����» ��������� �� �������» �������» ³���������������������»����» ¸�������æ�
¸¸© ¹© »© ¶��������» �������» �äÌ������������������������������������
����µ�������µº�¶����» ���������ºº� �������» �������» ��������������½��������Í«��������á������������» �������æ�
º»©º¶��������» �������» �������������á������
�����¶ �������¶� �������¶ �������¶ ���������������������������������¶ �������� �������¶ �������¶ â�����³�����â�����������·����¶ ������ � �������¶ �������¶ ������Ð���������������������¸����¶ ·������¹����º»�
��º¶��������¶ �������¶ �������� ��á�������
�¹��� ³�������� ²����� ²����� ç�������� ��Ñ����������µ���� ³�������� ²������ ²������ ç�������� ��Ñ����������º���· ³�������� ²�����· ²�����· ��ç�������� ��Ñ���������èéêèëìí �������¶� ²�����· ²�����· ���������������������������
èîêèëìïðñòóìíôìõöñ÷øèëìï öñ÷øèëìï ùóñúûüýóþÿó���÷��ú��úñ�ó��òúóóó÷��ÿ��ñÿú÷�÷�ÿññ��ú��úÿñ�óûü�
íëêèëìõ ðñòóì��ìé�ôèïöñ÷øèëìõ öñ÷øèëìõ J ����K���N�ø����úó�óú�ô���ú�ÿ÷ñ�ó���óú�óÿþó�úÿ���ô�ÿû�ûÿ��ñ��óúñ÷�óôÿ�����ó�
�kjl kh� �l�imnjf�
��������������������������������������������������������������������������������������������������������������������������������������������� ��������������������
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F ¾
�
�
����½�âá���´�������
��� � ´��� ������Ð�������������� �����������ª������� � ������ÍØ��������������©������ �������������� �Í����ÍØ���������������©�Í�����������
��������· ���������������� ��������©�Í��©���������¸ ������������������������½���� ���â�Í�����²�������������½����¹ ����������������� ������������������������������������µ ������������������ �������������¬������������©��������º ����¬���½�� ���©������������» �������������ª���� ��������������������Ì�����¶ ������������ �� ½���������������©�¬��â
� �����������
�� ���
�������������������������������������
��� ! "# $%&� ! '%( ) *"+,
-./01.2340536728 01.53508 067/39:; <=:;; $:>%>&�? @A(&:(B�(CD E;%(
E%B� F �
iÁÁkj�ei�e mf��
��
�����½�������� ��Í���Í���Ì�³�ä��Ì�ä�ÍÌ���¬����������Ì����³�����Í�³�
������Ì�����â������ä�������������������������������������� ��³�
�������������ª��������������½��������������������������������������� ��������������Í�����������������Í���������������Ñ��Ì��������� ���������³���ä�����©����������Ì����ä�����©�������©�Í� ����� ������Ì�����������������¬�����������������������������������������������������ª����Ñ���������������Ì�����������������������������³����������³������������������������������������������������Í� �����������������������³����������������������������������Ì����������������������������������â����������������������������������������ä��������������������������������������������������������������ª�Ì��������������������������������������������������������������������������������������������������������������������������������������� ��������������������³���
GUJARAT POLLUTION CONTROL BOARD Parvavaran Bhavan
.#
Sector - l0.-A,Gandhinagar - 382 O l 0. Fax : (079) 23232'156
Website : w & ~ . ~ ~ e ; b . ~ o v . i n
Consent to Establish (NOC)
PNO: PCICCA-JMN -3661 5 '30
To, MIS. ESSAR d LTD.
(Refinery division) PO BOX NO:24,Village: Vadinar, Post: Khambhalia, Dist:Jamnagar Pin:361 350
SUB: Consent to Establishment (IVOC) under Section of Water and Section 21 of Air Act 1981.
REF: Your Application no: nil dated:2310612007 and consecutive Correspondence with this office.
Sir,
Without prejudice to the powers of this Board under the Water (Prevention and Control of Pollution) Act-1974, the Air Act-1981 and the Environment (Protection) Act- 1986 and without reducing your responsibilities under the said Acts in any way, this is to inform you that this Board grants Consent to Establish (NOC) for propose enhacement of crude refining capacity from present 9WIMTA Capacity to 60 MMTA for the products tabulated below by a way of Debottlenecking and capacity maximization of the existing process units and augmentation with the new primary,secondary and the balancing processing units of integrated refinery cum petrochemical complex at survey no:62- 66,7712,88,97,286-297,299-310,312-323,363-366,368-377,378 p 1 &2,379-381,534,56- 61 etc of village Zankhar, Survey number 96 p,112-148,150-156,159 of village Timbdi,survey number 187-196,199-214,338,197,198,215-227,336 of village Kathi,Devalia, Survey number J-14,19,42,71,72 p,7-6p, 16-1 8 etc of village Sodhani Targadhi,dist: Jamnagar in phase mmanner. The total cost of the project is 54918 crore and out of that 3125 crore are earmarked for EMS and total Area is 2330 Hector.
PRODUCT PROFILE FOR REFINERY& PETROCHEMICAL COMPLEX
I Sr. I Product I Quantity 1 Quantity I Quantity (REFIENERY) (10.5MMTPA) (32MMTPA) (GOMMTPA)
PHASE-I PHASE-II PHASE-Ill1 1 1 LPG 0.65 MMTPA 2.16 MMTPA 2.77MMTPA 2 ATF 0.4 MMTPA 2.50 MMTPA 3.70 MMTPA 3 HSD 4.81 MMTPA 17.15MMTPA 20.98WIMTPA 4 PC NAPTHA 0.27 IVIIVITPA 1.49 WIMTPA 2.67 MMTPA 5 GASOLINE 1.85 MMTPA 9.75MMTPA 19.5 MMTPA 6 SULPUR 0.03 MMTPA 0.75 MMTPA 0.84 MMTPA
ANNEXURE - 2 CTE &CCA
GUJARAT POLLUTION CONTROL BOARD
Sector-1 0-A, Gandhinagar - 382 01 0. Fax : (079) 232321 56
Website : www.gpcb.gov.in
PRODUCT PROFILE FOR PETROCHEMICAL
14 1 IPA 1 75 1
SR NO 1 2 3
15 I
I LLDPE-HDPEIHDPE 1 4001400
PRODUCT OX0 ALCOHOLS
ppp
Phenol/Acetone/Bisphenol-A PROPOLEIIE
112 1 Ethvl BenzeneIStvrene 1 500
CAPACITY In KTA 137+150 20011 2011 50 1000
I Butadiene 1 180
160+80 8001600 200
7 8 9
Acrylic acid Para xylene1PTA LAB
SUBJECT TO THE FOLLOWING CONDITIONS:
15 16
The validity period of the order will be Five years from the date of issue
SPECIFIC CONDITIONS (* If the proposed project attracts EIA Notification &I CRZ Rules):
Butene-I -- MEG
1. Applicant shall not start any construction activities without getting Environment Clearance Certificate from SElAAl MoEF under EIA Notification dated 14/09/2006.
2. Applicant shall comply with the all conditions stipulated by SElAAl MoEF in the order of Environment Clearance as and when issued.
3 Applicant shall obtain CRZ clearance from competent authority under CRZ Rules and all conditions of the same shall be complied with.
4 Applicant shall obtain The permission under FCA-1980 for the forest land from GO1
5 CTE of the board will get effect after the permission is accorded under FCA- 1980 from GOI.
55 700
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A, Gandhinagar 382010Phone (079)23222425
(079) 23232152Fax (079)23232156
Website. www.gpcb.gov.in
NO: PC/CCA-JMN-366 (17)/ID-27398/TO,M/s. ESSAR OIL LTD. (REFINERY DIVISTON) (27398),PLOT NO: S.NO, 62-66 ,JAMNAGAR-OKHA HIGHWAY (SH-25), PO BOX NO: 24,VILL: VADINAR - 361305TAL: KHAMBHALIA,DIST: DEVBHOOMI DWARKA,
Date:
Sir,
SUB: Correction in renewal of the consolidated consent & Authorization of the Hoard.REF: Your letter reference no: EOLlE"\lV 117398/CC&A Amcndmentl20 16/646, 07112/2016.
With reference w the above suhject and reference letter, typographic correction in consolidatedconsent and Authorization order no. AWH-81987 date ofIssue: 13/1012016 is as under.
The said CCA order is further Correction as below:
First paragraph is corrected as below:In exercise of the power conferred under section-25 of the Water (Prevention and Control of
Pollution) Act-1974, lUlder section-21 of the Air (Prevention and Control of Pollution)-1981 amiAuthorization under rule 3(c) & 5(5) of the Hazardous and other Waste (Management, Trans boundaryVlovement) Rules'2016 framed under the Environment (Protection) Act-1986.
1. Condition No-l of the said CCA order is read as below:
Consolidated Consent and Authorization order No.: AWH-81987 date oflssue: 13/1012016.The c{)nsents shall be valid up to 16/0912022 for use of outlet for the discharge of tradc effluent & emissiondue to operation of industrial plant for crude processing capacity 21 MMTPA for the tollo\\-ingitems/products.
Sr. NO. ; Product i%y;"q21MMTPA
LPG 3.4-5.4
Kero+ATF 0-8.6Naphtha/ MSJ Gasoline 16-24.6
HSD 48.6-52.9Furnace Oil I V.G.O. 0-22.9
Sulfur 1.4-1.7
Bitumen 0-3.4
Fuel & Loss 7.8-8.7, Pet Coke 9.1-12.9
Condition No-2 of the saId CCA order IS read as below.2. CONDITIONS UNDER THE WATER ACT:
2.1. The Quantity of trade effluent from factory shall not exceed 25400 m' i Day.
2.2. The Quantity of sewage from factory shall not exceed 405 m' i Day.
Condition No-3 of the said CCA order is read as below:
3. CONDITIONS VNDER THE AIR ACT:
Fuel Consumption rate (Tihr.)iOlMTiHr
3.2.J(b) The following stacks attached to boileri furnacei heater shall eonfonn to the standards referred in
CO"dHiO;;;~~~aratGreen GujaratISO-9001-2008 & ISO-14001 - 2004 Certified OrganisatIOn
Outward No:413519,26/05/2017
Stack attacbed to Stack Dia. Meters Stack Hei1!bt. MetersCDUI VOU Heaters 5.7 130 ==1COU II Heaters 3.5 10ONIH,' CCR Heaters 5.7 130DllDSHcaters 2.4 70FCC Feed Heater 3.7 11OHMlJ Furnace 1.1 30HMU1&Il 4.7 45OCU Heater I, II & lU 2.5 65DHDT 2.8 60 -----jVGOHT 3.1 60
Sr. No.
103.2.2 Industrv shall have to vent t1ammahlc gases throu h the followin flares:
~,r·~t~~~-----L. :=-,'Offl""tack J:Em Stack h'iglrt~
h -1--.!::!ldrocarbon Base flare _,~__ ,100 m " "ih-=--. I 1Tydrocarbon~Tonfure--W-----=----=----=-~--=-_~ ~_----=-_---:-~--=-lrT.-_:::JH2Sfl'-"-----H- - --j-'"O-"' --1tL-Th~~~~~_=_--=-~~_=__=____=__=__=_J~~,~~~~~_=____j
4. CONDITIONS UNDER THE HAZARDOUS AND OTHER WASTE (MANAGEMENTTRi\NSBOlINDARY MOVEMENT) RULES, 2016:
4.1 The authorization is granted for the following hazardous waste, its quantity and mode ofhandlin & dis osal:
Sr. No .
. 2
Disposal
regi~tcred decontamination Ifacihlyiactual user only
Spent I Collection, St~rage, transportation and!
~_~I_w_as_"__ ~ ~ ~:-",~~::;","lto lSDF'I",in'mtiOW"ct~
Outward No:413519,26/05/2017
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector-10-A, Gandhinagar 382010Phone (079)23222425
(079) 23232152Fax (079)23232156
Website. www.gpcb.gov.in
Battery waste
liiClassE-3 I JOOMT
I
12 ExpiredHazardous
I chemicals(Li uid/Solid)
14 E- Waste 1-- 2QMT
15 Waste Coke U-C\ass,A 70 lOOMT
16 Spent Catal)'st 1.6and MolecularSieves
13 Spent Carbon I 36.2, (Solid) I 1200MT
4.11 The occupier may store the hazardous waste tor a period not exceeding 90 days and shall maintainthe records of sale, transfer, storage, recycling and reprocessing of such wa~te and make theserecords available for inspection. GPCB may extend the said period under certain conditions specifiedin the Hazardous and other Wastes( Management and Transboundary Movement) Rules - 2016.
4.17 rhe generator, occupier, transporter and operator of the rSDF tacility shall comply with thedirectives specified by MOEI-", Govt. of India, under the Hazardous and other Wastes( Managementand Transboundary Movement) Rules - 2016.
4.23 The transporter shall be given relevant information in Form -9(TREMCARD).4.35 In case, of an accident or spillage of hazardous waste during transit report in Form-II shall be made
to GPCB, Gandhinagar with a copy to Regional Office.4.43 In case of any accident, details ofthe same shall be submitted in Form - II to GPCB.
2. The rest ofthe conditions of the above referred CCA order shall remain unchanged You an: directed tocomply with these conditions judiciously.
For and on behalf of
Guj."" Ponution con"o~
(R.V. Patel)
Senior Environmental Engineer
Clean Gujarat Green GujaratISO-9001-2008 & ISO-14001 - 2004 Certified OrganisationOu
tward No:413519,26/05/2017
GuJarat Pollutlon Control BoardPery.v.r.n Bh.v.n5ect0l- to-A. GANOHINAGAR-382043Phone: 22756. 22095, ~ Gram: CLEANWATERFax: 02712·32156
8l" L;l C.~18ail.tl ~"'l'l "'l'loj "-''l it. "-"''' oil0'" e-(L (il'l",il ($<fi",,,,1.'<:1\e.,(."-" ..,(.5'-". "''l''''''-''''Wl
~l0'q("-""-'H~). >it 01\", .,(.••. 'll'l-'US\"'''-3S''O~. ell."'(>UC-{\~l.~}q"lli\ """ 6"0 6~h
'iC{l<U",. "'~ ",<fie"", ~v(['" $'1C-Ioj6,'llc'" ,;; rn
'Wl' o1\s"'l ",ro."iloilo"l "'l'l"'l "-''l o{\ell1S/O,llO\~"'l 0'" ,W, 'iC-I"lelc-{\Q",'''' "'l'loj "-''l
,,<1M"'~lla" ",6\"'~ o{\a'i",,,,o{\e<l?coilit'll 'l<n"
y "'l'l"'l "-''l ml "" b05C-{\"'"0'SC{l0'",oil'{"ell ",b,u" ''t "" ",.n.y "'l'l"'l "-''l om H,S 'lle oil",C-ll0'",>i\o{\eil'l 0.l<'l 'is'' ",.n.y "'l'l"'l "-''l om e.; ,l>! (q"''''li (;\~>llel"'l'l' ~qloj 'l,o{\eil" 'Nl'li "'lq1 ",.n
6'10"" (q'lrll ~ \<tl~ "O~ "'l'lo{\ "lil. "ql ",I\l(;\~'l \CG\ bout"'l'lo{\ "lil. 'l'LC{lS'l '" C'\qlct""'''' 6l'~lc'\' oilt\" 'llOqql'li "'lq " el'" 6'10"" "'l"'el '{"ell ,il "'~ "" 6l<1ql6\o{\"'~l lI."'-~'ll€.Mla~ ':\.<lClL ~uu 5:(clL "l:l'~LlClcUl{i ~Lq~, 'it ctl{ 5:(cUl-li 8t:!<cU (~~il<it u{tS \l..m ~clL ~(u'R2.lJ.t'tc;('t
bout""i! 6l<1ql6\"ql'li "'lqit.
JJ"ls'<lrt 'Y-s.'I:::l.~l ra:t4?lt;l &.ltS <1l o1.lH Ol.~ qctl
:_YlllllIIHlfm!i<nM't'\·H!!" Ui_ltl @5:1l!1.JtWIIIIII~
(w(.cll,1.t2.c-{1 iq\}'6'Pfu!?'lqN;" __ ;;
\lGl.
it. "-"''' oil's" c-{\.(~,l"'{[ ($<fi",,,,).
'<:1\e.,(."-"'.,(.51-". "''l''''l.1-oilWl ~l0'q("-""-'H~).1.U vUs-M a1..<'ll', :lLLl{-cuSlotL(63S'l.3011.
rll."'(>UC-{\~l.~.Eq"lli\ Ol16l.
"1.5:(1 (cllatL:-
\) \llEr.t, ",ro.61il..n,'J.\l.R.o1\S,\llEr.t,,ai!, "''l''''''.
- 6'10"" "'l",<l "'l'l"'lw,1ll <it"" 6l<1ql6\"ql ",if .
• )<i"'<l'w,,.
'-<tv'_J'@;r'"",\lrO
utward No:418919,31/07/2017
ANNEXURE- 3 GPCB SCN
Annexure-II
Coal Handling Guideline
Page 1 of 4
Compliance Status as on 15/05/2017
SR. No.
Instruction EOL Compliance Status
1 Coal handling unit/Agency shall not use any agriculture land and shall be located at a minimum 250 meters away from the surrounding agricultural land.
Location is within refinery premises
2 Government waste land not suitable for any agricultural purpose meeting with requisite siting / distance criteria shall be preferred for establishing coal handling units.
Location is within refinery premises
3 Coal handling unit/Agency shall be minimum 500 meters away from the residential area, school/colleges, Historical Monuments, Religious Places, Ecological sensitive area as well as forests area.
Complied. Pet coke storage location is far from the residential area, school/colleges, Historical Monuments, Religious Places, Ecological sensitive area as well as forests area.
4 Coal handling unit/Agency shall be located at a minimum 500 meters away from the Railway line, Express ways, National Highways, State ways and District Roads and from water bodies like River, Nala, Canal, Pond etc.
Complied. Pet coke storage location is far from Railway line, Express ways, National Highways, State ways and District Roads and from water bodies like River, Nala, Canal, Pond etc.
5 In case of coal handling activities at the ports and jetties or extension thereof, the distance and land use criteria may be relaxed and compensated by advanced/sophisticated pollution control measures and mechanization & thick plantation, however all such ports & jetties, where coal handling is carried out, shall provide closed conveyor belt and mechanization for handling of coal.
Not Applicable
6 Coal handling unit/Agency shall store coal in such a way that coal heap should not be higher than 5 meter and clear distance between two adjoining heaps at G.L should be 5 meters, so that in case of fire approach is available.
Pet coke heap height is maintained below 2.5-3.0 meter and distance between two adjoining heaps at G.L is maintained more than 5 meter.
7 There should be mechanized loading/ unloading system from the loading /unloading area to the stacking yards and in to the vehicles.
Automatic truck loading system is provided for pet coke loading from Silo. Front end loader used when lifting from yard.
8 Coal handling unit/Agency shall take all corrective steps to resolve the issue of air pollution at permitted coal storage/handling area where coal is being stored.
We have taken all preventive measures to resolve the issue of air pollution at permitted coke storage/handling area where coke is being stored.
9 Coal handling unit/Agency shall ensure that all trucks before leaving the storage yard shall be showered with water with adequate system, Shall be covered with tarpaulin or any other effective measure/device completely and also that trucks are not over loaded as well as there is no spillage
Truck / dumpers are covered with Tarpaulin while they are plying on the road from one location to other.
Wagons are loaded by pay-loader and loaded wagons are covered with tarpaulin
The company had been issued two direction from CPCB regarding online monitoring. Details are as
below:
Sr. No. Direction Issued Points given in direction Present Status
01 Implementation of dynamic emission limit for OCMES for oil refineries vide letter no. B-29016/04/06/PCI-I/16243 dated 10th January, 2018.
Implement the dynamic emission limit and submit the documentary evidence of implementation of limits where mixed fuel is used in the stacks for all the parameters.
Dynamic emission limit has been implemented in all the four stacks using mixed fuel (FO & FG) attached to CDU/VDU, CDU II, DHDT & VGOHT for all the parameters. Continuous data for dynamic emission limit is being uploaded on CPCB server.
02 Direction under section 5 of the Environment (Protection) Act, 1986-notice thereof. Vide letter B-29016/04/06/IPC-I/ dated 06.06.2018.
1. In FCC-R unit the measured CO value was BDL, but the OCEMS value was 320.37 mg/ Nm³, the value is within the GPCB prescribed limit of 400 mg/ Nm³
1. M/s Nayara Energy Limited has carried out recalibration of the OCEMS in FCCR unit immediately as per your suggestions during your visit to our site on 02.05.2018. The calibration of each analyzer is conducted on quarterly basis as per the schedule & the instrumentation team is strictly following the calibration schedule.
2. In DCU- 1 & 3 the measured CO Value was BDL, but the OCEMS values in DCU-H1 576.65 mg/ Nm³, DCU- H3 240.27 mg/ Nm³ are exceeding the GPCB prescribed limit of 150 mg/ Nm³
2. The OCEMS is showing
erroneous value due to
calibration issue. M/s
Nayara Energy Limited has
carried out recalibration of
the OCEMS in DCU
immediately as per your
suggestions during your visit
to our site on 02.05.2018.
The calibration of each
analyzer is conducted on
quarterly basis as per the
schedule & M/s Nayara
Energy Limited is strictly
following the calibration
schedule.
ANNEXURE- 4 DIRECTION OF CPCB regarding Online Monitoring
3. The Unit has not provided OCEMS for the measurement of PM and SOX in the stacks attached to SRU unit as per inspection report and CPCB , IT division report dated May 28, 2018
3. The Consolidated Consent
and Authorization
(enclosed as Annexure- I)
received from Gujarat
Pollution Control Board
has not prescribed limit for
PM and SOX in SRU stacks.
Hence, M/s Nayara Energy
Limited has not installed
PM and SOX analyzers in
SRU Unit.
4. The unit has not installed online PM analysers in 13 stacks out of 17 stacks except CDU, VDU and FCCR unit as per IT division report dated May 28, 2018
4. M/s Nayara Energy Ltd. has already installed SOX, NOX, and CO in all the units and have hooked up the same with CPCB server since 2015. PM analyzers have been installed earlier in four units CDU, VDU, CDU-II and FCCR units.
The Consolidated Consent and Authorization CC&A received from Gujarat Pollution Control Board has not prescribed any limit for PM in SRU & SRU-1 stacks. Mini HMU unit is not in operation.
For remaining 10 units,
orders have been placed
for accessories of PM
analyzers. Quotations have
been received which are
under Technical
Evaluation. PM analyzers in
all remaining 10 stacks will
be installed in the
forthcoming turn around in
November 2018. We
would like to mention that
ANNEXURE- 4 DIRECTION OF CPCB regarding Online Monitoring
we burn Fuel Gas in these
heaters.
5. The unit shall take appropriate measures and calibrate the OCEMS system to reflect the correct value of CO emissions in the stacks attached to FCCR, DCU-1 & DCU-3.
5. M/s Nayara Energy Limited
has carried out
recalibration of the OCEMS
in FCCR, DCU-1 & DCU-3
units immediately to
reflect the correct value of
CO emissions as per your
suggestions during your
visit to our site on
02.05.2018. The
calibration of each
analyzer is conducted on
quarterly basis as per the
schedule & M/s Nayara
Energy Limited is strictly
following the calibration
schedule.
6. The unit shall provide OCEMS in all stacks for the measurement of SOx, NOx, PM and CO.
6. M/s Nayara Energy Ltd. has already installed SOX, NOX, and CO in all the units and have hooked up the same with CPCB server since 2015. PM analyzers have been installed earlier in four units CDU, VDU, CDU-II and FCCR as these units are Furnace Oil based units.
The Consolidated Consent and Authorization CC&A received from Gujarat Pollution Control Board has not prescribed any limit for PM in SRU & SRU-1 stacks. Mini HMU unit is not in operation.
For remaining 10 units,
orders have been placed
for accessories of PM
ANNEXURE- 4 DIRECTION OF CPCB regarding Online Monitoring
analyzers. Quotations have
been received which are
under Technical
Evaluation. PM analyzers in
all remaining 10 stacks will
be installed in the
forthcoming turn around in
November 2018. We
would like to mention that
we burn Fuel Gas in these
heaters.
ANNEXURE- 4 DIRECTION OF CPCB regarding Online Monitoring
Annexure - 5
Monitoring the Implementation of Environmental Safeguards
Ministry of Environment, Forest & Climate Change
Western Region, Regional Office, Bhopal
MONITORING REPORT
PART-1
DATA SHEET
EC No. : F No. J-11011/320/2006-IA-II (I) dated 16th September, 2008
1. Project type: River- valley / Mining/ Industry /
Thermal / Nuclear / Other (Specify)
: Crude Oil refinery with Petro-chemical complex
2. Name of the project : M/s Nayara Energy Limited. Dist. – Devbhumi
Dwarka, Gujarat.
3. Clearance Letter (s) OM No. & date : F No. J-11011/320/2006-IA-II (I) dated 16th
September, 2008
4. Location
A) District (s)
B) State (s)
C) Location Latitude/ Longitude
:
:
:
Refinery Site, 39 KM, Jamnagar-Okha Highway, Vadinar
361305, Gujarat, India
Devbhumi Dwarka
Gujarat
5. Address for correspondence
A) Address of the concerned Chief Engineer
(With Pin Code & telephone/ telefax/ fax
numbers)
B) Address of the executive Project Engineer/
Manager (With Pin Code & telephone/
telefax/ fax numbers)
:
:
Mr. Prabhanjan Dixit
Refinery Site, 39 KM, Jamnagar-Okha Highway, Vadinar
361305, Gujarat, India
Mobile no. : + 91 2833662017
Ms. Asmita Patel
Refinery Site, 39 KM, Jamnagar-Okha Highway, Vadinar
361305, Gujarat, India
Mobile no. : + 91 2833662506
6. Salient Features
A) of the Project
B) of the environmental management plans
:
:
(A) Project Features: Refinery is currently operating
at 20 MMTPA capacity. It is now proposed to
expand the refining capacity to 46 MMTPA along
with Petrochemical Project.
The expansion project will be within the existing
premises & shall be interlinked with the existing
unit.
(B) Environmental Management Plans (EMP) :
Environment Management Plan (EMP) was
prepared based on the baseline data collected by
NEERI and impact prediction were done using
mathematical models and superimposition of
those impacts on the baseline. EMP includes
provision of state of the art Effluent Treatment
Plant and Air Pollution control equipment, solid
waste management and Green Belt development.
Regular environment monitoring is also a part of
EMP. Major points implemented as per EMP e.g.
1. Use of Low Sulfur Refinery fuel Gas and fuel oil are
used as fuel in heaters / furnaces.
2. Installed Amine Absorbers - The fuel gas produced
in the refinery contains H2S. This is removed in the
Amine Absorber Columns and the sweet gas is
routed to Refinery fuel gas system.
3. Installed Low NOX burners in all heaters / furnaces.
4. Installed Low Temperature Shell Claus off Gas
Treating Units (LT SCOT) at Sulfur Recovery Unit
having sulfur recovery efficiency more than
99.7%.
5. Leak Detection and Repair Program (LDAR) has
been implemented in the refinery.
6. Continuous Emission Monitoring System,
Continuous effluent monitoring system and
continuous Ambient Air Quality Monitoring
system have been installed. The same has been
hooked up with CPCB server. Request has already
been made to SPCB for connecting to their server.
Earlier request has been declined due to
insufficient capacity of SPCB server.
7. State of art waste water treatment plant installed
with sufficient capacity. The entire Treated
Effluent is then reused as Fire Water, Service
Water & Cooling Towers and green belt.
8. Hazardous waste (HW) management procedure is
in place for effective waste management. HW is
being disposed to GPCB authorized actual users.
Details of type of hazardous waste and their mode
of disposal is as given below.
Type of hazardous waste and their mode of disposal is as given below.
Sr. No.
Type of waste Method of disposal
1. Oily Sludge from ETP (Semi- Solid) Reprocessing at Delayed Coker Unit (In-house)/co-processing in cement industries.
2 Used Lubricating Oil (Liquid) Sold to authorized actual users 3 Discarded Empty Drums /
Containers (Solid) Sold to authorized actual users
4 Slop Oil(Liquid) In-house recycling / reprocessing
5 Oily Rags/ Oil Contaminated Cotton Waste (Solid)
Sold to authorized actual users / incineration facility
6 Spent Catalyst From Various Units (Solid)
Sold to authorized actual users
7 Electronic and Electric Waste (Solid)
Sold to authorized actual users
8 Lead Acid Battery Waste (Solid) Sold to authorized actual users 9 Spent Carbon (Solid) Incineration in VPCL Boiler
10 Insulated Copper Cable with PVC Sheathing (Solid)
Sold to authorized actual users
11 Oily Sludge & BSW Sent to Pollution control board authorized TSDF / Incineration facility
12 Spent Resin Waste Sent to Pollution Control Board authorized recycling facility.
7. Break-up of the project area
A) Submerged Area : Forest and non-forest
B) Others
:
:
Total Area : 2275 Ha
Green Belt Area : 410 Ha
Currenltly 20 MMTPA refinery is established in
1171 Ha area out of total project area of 2275
Ha. As per the current establishment, we have
developed green belt in 410 Ha area which is
35.04 % of the plant area.
A) Submerged Area: 15.49 Ha of forest land is used for
laying of pipelines & construction of jetty.
Permission was granted vide letter no.:
8C/12/385/96-FCW dated 08/12/1999. (For
detailed letter please refer Annexure 5.1)
8. Break-up of the project affected population with
enumeration of those losing house/dwelling units
only, agricultural land only, both dwelling units &
agricultural land & landless labourers/ artisans:
a) SC, ST/Adivasi
b) Others
(Please indicate whether these figures are based in
any specific survey carried out or only provisional
figures, if a survey is carried out, give details & year
of survey)
: Not applicable, as the project does not require
additional land as the proposed project will be
established in the existing refinery complex.
9. Financial details
:
A) Project Cost as originally planned and
subsequent revised estimates and the year
of price reference:
B) Allocation made for environmental
management plans with item wise & year
wise break-up.
C) Benefit cost ratio/ internal rate of return
and year of assessment
D) Whether it includes the cost of
environmental management as shown in
the above
E) Actual expenditure incurred on the project
so far
F) Actual expenditure incurred on the
environmental management plans so far
:
:
:
:
:
A) Cost of Project was Rs.78,730 Crore (For 60
MMTPA) as originally planned in 2006.
B) Allocation made for environment protection
measures with item wise & year wise break up
is given below.
C) Since the refinery project is very large and
entails a very long period & also get affected by
international crude prices & fluctuations. At
present it is not possible to provide such
details.
D) Yes.
E) Actual cost of project as on date is 51000 Crore
(For 20 MMTPA).
F) Actual expenditure incurred on the
environmental management plans from 2008-
09 to 2018-19 is as given below.
Allocation made for environment protection measures:
Environment Protection
Facilities
Year Wise Expenditure incurred in Crores (CAPEX)
2008-09 2011-12 2013-14 2018-19
Base ETP 53.53 - - -
Base SRU 443.34 - - -
Expansion ETP - 171.40 - -
RO Unit - 75.51 - -
Expansion SRU - 234.07 - -
Hazardous waste shed & Pit - 26.08 - -
Online Ambient Air Quality
Monitoring System - - 2.00 -
Online emission monitoring
analyzers - - - 2.00
Green Belt Development 0.6 5.4 3.9 7.9
TOTAL 497.47 513 5.9 9.9
Environment Protection
Facilities
Year Wise Expenditure incurred in Crores (OPEX)
2013-14 2014-15 2015-16 2016-17 2017-18
Opex - Environment Cost
Centre
1.01 0.19 0.89 1.23 0.81
O & M EXPANSION SRU 0.29 0.09 0.17 6.07 4.25
O & M OF BASE SRU 0.90 0.23 0.36 3.03 0.94
O & M OF EXPANSION
WWTF & RO
10.21 4.31 3.52 5.35 5.06
O & M OF BASE WWTF 0.62 0.20 0.15 0.16 2.05
Green Belt Development 6.6 1.72 1.74 1.5 -
TOTAL 19.63 6.74 6.83 17.34 13.11
10. Forest Land requirement
A) The status of approval for diversion of forest
land for non-forestry use
B) The status of cleaning felling
C) The status of compensatory afforestation, if
any
D) Comments on the viability & sustainability of
compensatory afforestation program in the
light actual field experience so far.
:
A) 15.49 Ha of forest land is used for laying of
pipelines & construction of jetty. Permission has
been granted vide letter no.: 8C/12/385/96-
FCW dated 08/12/1999 is given below. (For
detailed letter please refer Annexure 5.1).
B) Not major cleaning felling is required. However,
compensatory afforestation was done in 9.6 Ha
area against the damaged 3.2 Ha area. Detail of
the same is covered under point (C) below.
Apart from this we have also done voluentary
mangrove aforestation in area of 175 Ha.
Details are attached as Annexure 5.2).
C) Rs.14,03,168 were paid vide cheque
no.1158348 dated 7.1.1998 toward the
payment of compensatory afforestation. Copy
of letter No. LFS/OP/MNP-801,dated.7.1.1998
sent to CCF (MNP) is as given below (For
detailed letter please refer Annexure 5.3).
D) Equivalent Non Forest Land handed over to
forest department for compensatory
afforestation & afforestation program is done &
monitored by forest department themselves.
11. The status of clear felling in non-forest areas (such
as submergence area or reservoir, approach roads),
if any with quantitative information required
: There was no clear felling in forest area for the project.
12 Status of construction (Actual or planned)
A) Date of commencement (Actual or
planned)
B) Date of completion (Actual or planned)
: The construction activity for 14 MMTPA refinery was
completed & commissioned during 2010. Then
expansion for achieving 20 MMTPA in the year 2012.
13 Reason for delay if the project is yet to start : Company is operating at 20MMTPA capacity in refinery
complex at Vadinar.
However, owing to the business requirement the plan
for further expansion up to 60 MMTPA could not be
implemented as planned.
14 Dates of site visits
a. The dates on which the project was
monitored by the RO in the previous
occasions, if any.
b. Date of site visits for this monitoring report
:
a. Project was monitored by Director (S) dated
28.08.2008
b. The site visit for above monitoring report was
carried out on 30/08/2018
15 Details of correspondence with PA for obtaining
action plans/information on status of compliance
to safeguards other than the routine letters for
logistic support for site visits.
:
Date & No. Letter from RO Date & No. Letter/ Reply from PA
23/06/2018 Letter No. : Nayara Energy/ENV/EC
Compliance Certificate/2018/758 Request
letter along with EC compliance status for
seeking certified compliance report.
25/07/2018 Letter no. File no.5-26/2008(Env)/285
dated 25/07/2018 from MoEF& CC,
Regional Office, Bhopal.
08/08/2018 Mail from MoEF&CC for certified
compliance report to be uploaded on
portal
30/08/2018 Visit by MoEF&CC officials (Scientist D) for
certification of EC compliance