PREFACE
Our thanks and gratitude to Almighty God for blessing us with health in our daily life
and activities.
This activity report details the evacuation simulation carried out according to the
Standard Operation Procedure (SOP) in the Banjir Bandang Early Warning System at
the Kalijompo Watershed. The simulation is organized by Yayasan Pengabdi Masyarakat
(YPM), Jember, East Java, Indonesia, in cooperation with Japan International
Cooperation Agency (JICA). The purpose is to train the community and stakeholders,
especially the PBP Satlak (Implementation Unit) in the Jember Regency, in the
implementation of the Kalijompo Watershed SOP. By learning to implement the SOP in
real life, the community also learns to mitigate the effects of banjir bandang.
YPM wishes to thank Japan International Cooperation Agency (JICA) for their trust in
YPM during the cooperation in organizing disaster management activities, especially in
the Jember Regency.
Jember, November 2011
Yayasan Pengabdi Masyarakat
Director,
Dr. Evita Soliha Hani
Halaman 3
TABLE OF CONTENTS
PREFACE .................................................................................................................................... 2
TABLE OF CONTENTS ............................................................................................................ 3
LIST OF TABLES ........................................................................................................................ 4
INTRODUCTION
Background ............................................................................................................................... 6
Objectives .................................................................................................................................. 7
Work Scope ............................................................................................................................. 7
IMPLEMENTATION METHODS
Activities ..................................................................................................................................... 8
Schedule .................................................................................................................................... 9
Plan Design ............................................................................................................................... 9
Scenario ..................................................................................................................................... 12
ACTIVITIES
Preparation ............................................................................................................................... 34
Opening Ceremony ................................................................................................................ 35
Simulation ................................................................................................................................. 38
EVALUATION
Evaluation by the Committee .............................................................................................. 42
Evaluation by Various Parties ............................................................................................... 42
RECOMMENDATION .............................................................................................................. 46
CONCLUSION .......................................................................................................................... 47
ATTACHMENTS
Attendance List
- Coordination Meeting, October 21, 2011 ..................................................................... 48
- Rehearsal, October 22, 2011 ............................................................................................. 50
- EWS Exercises and Evacuation Simulation, October 23, 2011 ................................. 52
Documentation of Activities ................................................................................................. 60
Halaman 4
LIST OF TABLES
Table Title Page
1. Work Schedule for the Early Warning System (EWS) Exercise and Evacuation
Simulation ............................................................................................................................ 9
2. Scenario for for the Early Warning System (EWS) Exercise and Evacuation Simulation
................................................................................................................................................ 10
3. Training Scenario for the Banjir Bandang Early Warning System and Evacuation
Simulation ............................................................................................................................ 12
Halaman 5
LIST OF FIGURES
Figure Title Page
1. Simulation Location Plan in the Klungkung Village Square ................................... 11
Halaman 6
INTRODUCTION
Background
An Early Warning System (EWS) is the obligation to provide information on
disaster threat predictions to the public prior to hazardous occurrences. The purpose of
EWS is to warn the public, thus alerting and enabling them to take the measures
appropriate to the condition, situation, and time. The main principle in EWS is to
provide applicable steps that are fast, accurate, effective, acceptable, understandable,
reliable, and sustainable. A well-implemented early warning system protects and saves
the public from the threat of banjir bandang.
The early warning system is an effective key step in reducing the effects of
disasters. The public should be aware of and familiar with the system and must be
informed of detection results, especially when they live in flood-prone areas. Therefore,
the warning system needs a standard operation procedure (SOP) in order to become
more effective.
An early warning system is effective when it is well understood by the public,
becomes a communal necessity, and raises the community's awareness of disasters.
Thus the SOP must be realistic and credible in nature, conforming to the community's
characteristics and needs.
The early warning system for the Kalijompo Watershed, Jember, is composed
through several stages. The SOP is jointly composed by representatives from the
Jember Satlak, Patrang Regency, Sukorambi Regency, Klungkung Village, Karang Pring
Village, Gebang Poreng Village, Slawu Village, as well as the residents and community
leaders, and the Kalijompo Plantation.
SOP implementation exercises are mandatory, and one of the forms of exercises
is simulation. In simulations, real issues, situations or processes are acted out in real life.
Simulations generally require conditions that represent the key characteristics or
behaviors of the chosen physical or abstract system. Simulations can be used to show
Halaman 7
the real-life effects of alternatives conditions and methods when the main system is out
of action, inacessible, risk-laden, unacceptable under certain circumstances, still being
designed and not yet established, or non-existent. Through simulations, the public will
gain a more comprehensive knowledge of the SOP and f irsthand experience of the way
the SOP works. Simulation trainings are a method to prepare the public against
disasters, as simulations are replications of emergency situations and used to gauge the
participants' reaction to real-life situations.
Objectives
The objectives of the early warning system training and evacuation simulation
are:
1. To provide estimations of the SOP implementation that are as close to the real
circumstances as possible;
2. To provide an alternative design for operating the SOP, in order to increase public
understanding of disaster management;
3. To facilitate the testing of SOP on disasters;
4. To provide facilities for studying the SOP in a shorter period and in more practical
terms.
Work Scope
Below are the activities in the evacuation simulation:
1. Creating a simulation scenario;
2. Coordinating the groups def ined in the Kalijompo Watershed SOP for their
involvement in the simulation;
3. Carrying out the simulation;
4. Documenting the simulation activities.
Halaman 8
IMPLEMENTATION METHODS
Activities
Below is the list of activities in the simulation:
1. Composing a simulation scenario based on the Banjir Bandang EWS SOP for the
Kalijompo Watershed;
2. Consulting with the staff at the Kalijompo Watershed;
3. Coordinating with the various groups to be involved in the simulation;
4. Brief ing and providing the training scenario for the groups to be involved in the
simulation;
5. Preparing the location and instruments for simulation;
6. Performing the initial training after the location and instruments have been
prepared;
7. Performing the f inal training before the simulation;
8. Organizing the simulation;
9. Evaluating the simulation.
Halaman 9
Schedule
The above steps will be completed according to the following schedule.
Table 1 Work Schedule for the Early Warning System Exercise and Evacuation
Simulation
Activity Day Time Location
1. Composing a simulation
scenario
Monday,
October 17, 2011
- YPM
2. Consulting with the staff at
the Kalijompo Watershed
Tuesday,
October 18, 2011
08.00-end Bakesbang Linmas Jember,
Sukorambi Regency,
Klungkung Village,
Kalijompo Plantation
3. Coordinating with various
groups
Wednesday,
October 19, 2011
09.00-end Public Welfare Division,
Jember
Thursday,
October 20, 2011
09.00-end Klungkung, Karang Pring,
Slawu & Gebang Poreng
Villages; Sukorambi &
Patrang Regencies
4. Briefing and providing the
training scenario
Friday,
October 21, 2011
13.00-end Klungkung Village Hall
5. Preparing the location map
and instruments
Saturday,
October 22, 2011
08.00-12.00 Klungkung Village Square
6. Performing the initial
training
Saturday,
October 22, 2011
13.00-15.00 Klungkung Village Square
7. Performing the final training Saturday,
October 22, 2011
15.30-17.00 Klungkung Village Square
8. Organizing the simulation Sunday,
October 23, 2011
08.30-end
(See schedule in
Table 2 )
Klungkung Village Square
9. Evaluating the simulation Sunday,
October 23, 2011
At the end of
the simulation
Klungkung Village Square
Halaman 10
Table 2 Scenario for for the Early Warning System Exercise and Evacuation Simulation
Day Time Activity Location Persons in charge
Sunday,
October
23, 2011
08.30-09.00 Preparation/
Registration
Klungkung Village
Square
The committee
(YPM)
09.00-09.30 Opening
ceremony
Klungkung Village
Square
Preamble from
YPM Director
Klungkung Village
Square
Dr. Evita Soliha
Hani
Preamble from
JICA
Klungkung Village
Square
JICA Expert
Preamble from
Satlak PB
Klungkung Village
Square
Asistant II or
representative
09.30-12.30 Simulation
Klungkung Village
Square
Participants and
YPM
12.30-13.00 Evaluation of
simulation
Klungkung Village
Square
YPM and JICA
13.00-end Closing
ceremony
Klungkung Village
Square
The committee
Halaman 11
Location map
Figure 1 Simulation Location Plan in the Klungkung Village Square
Evacuatio
n Post
Upstream
Villages
Karang
Pring
Klungkung
Secretaria
t
Satlak PB
Jember
Kalijompo
Plantation
Down-
stream
Villages
Slawu
Gebang
Poreng
JICA
Guests
Regencie
s
Sukoramb
i
Patrang
Meeting
point for
upstream
villages
Meeting
point for
downstre
am
villages
Entrance
Men
's e
vacu
atio
n t
ents
Wo
men
's w
ash
roo
m
Men
's w
ash
roo
m
Wo
men
's e
vacu
atio
n t
ents
Logi
stic
s te
nt
Public
Kitchen
M
edic
ten
t
SCENARIO
A more detailed simulation scenario is shown on Table 3 below.
Table 3 Training Scenario for the Banjir Bandang Early Warning System and Evacuation Simulation
Condition Scene Setting Description Action Time Duration Notes
Normal-Alert
- Rain: 30
mm/day
- Water level:
100 cm
- Fissure: 0
1 Kalijompo
Plantation
Normal weather, a
little cloudy. A rainfall
gauge equipped with
a sensor to mark the
water level, water level
gauge, a fissure
gauge; and
communication
devices (cell phones
and walkie-talkies).
A drizzle falls and
turns into rain. Mr.
Agus observes that the
rainfall reaches 30
mm/day and water
level is 100 cm, thus
the status of the
Kalijompo Watershed
is at Level 1: Alert.
Mr. Agus monitors the weather
and checks whether all the
instruments function properly.
During rain, Mr. Agus monitors
changes in the gauge levels
more carefully and attentively
When the rainfall reaches 30
mm/day and water level 100
cm, Mr. Agus informs the
Satlak, heads of the Klungkung
and Karang Pring villages, the
Sukorambi Regent, and heads
of the Slawu and Gebang
Poreng sub-districts of the
Level 1: Alert status.
09.30-09.35 5 minutes PIC: Ebban
Instruments:
Rainfall gauge
Water level
gauge
Fissure gauge
Cell phones
Walkie-talkies
Halaman 13
2 Klungkung Village Hall
Normal condition, activities are carried out as usual.
The sky turns cloudy, a drizzle falls and turns into rain.
Village officials are on standby and on alert.
Village officials check the communication devices.
“Assalamualaikum, good morning to the head of the Klungkung village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the village,”Thank you, we copy. We will follow up on your information.”
09.35-09.40 5 minutes PIC: Djoko Devices: Cell phones Walkie-talkies
3 Karang Pring Village Hall (Upstream Village)
Normal condition, activities are carried out as usual.
The sky turns cloudy, a drizzle falls and turns into rain.
Village officials are on standby and on alert.
Village officials check the communication devices.
“Assalamualaikum, good morning to the head of the Karang Pring village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the village,”Thank you, we copy. We will follow up on your information.”
Idem 5 minutes PIC: The committee Devices: Cell phones Walkie-talkies
Condition Scene Setting Description Action Time Duration Notes
Normal-Alert 4 Sukorambi Normal condition, Village officials are on standby Idem 5 minutes PIC: The
Halaman 14
- Rain: 30
mm/day
- Water level:
100 cm
- Fissure: 0
District
activities are carried out as usual.
The sky turns cloudy, a
drizzle falls and turns
into rain.
and on alert. Village officials check the
communication devices. “Assalamualaikum, good
morning to the head of the Sukorambi village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the
district,”Thank you, we copy.
We will follow up on your
information.”
committee
Devices:
Cell phones
Walkie-talkies
5 Slawu Sub-District (Downstream Village)
Normal condition, activities are carried out as usual.
The sky turns cloudy, a drizzle falls and turns into rain.
Village officials are on standby and on alert.
Village officials check the communication devices.
“Assalamualaikum, good morning to the head of the Slawu village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the sub-district,”Thank you, we copy. We will follow up on your information.”
Idem 5 minutes PIC: The committee Devices: Cell phones Walkie-talkies
6 Gebang Poreng Sub-District
Normal condition, activities are carried out as usual.
Village officials are on standby and on alert.
Village officials check the
Idem 5 minutes PIC: The committee Devices:
Halaman 15
(Downstream Village)
The sky turns cloudy, a drizzle falls and turns into rain.
communication devices. “Assalamualaikum, good
morning to the head of the Gebang Poreng village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the sub-district,”Thank you, we copy. We will follow up on your information.”
Cell phones Walkie-talkies
7 Patrang District
Normal condition, activities are carried out as usual.
The sky turns cloudy, a drizzle falls and turns into rain.
Village officials are on standby and on alert.
Village officials check the communication devices.
“Assalamualaikum, good morning to the head of the Patrang village. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from head of the district,”Thank you, we copy. We will follow up on your information.”
Idem 5 minutes PIC: The committee Devices: Cell phones Walkie-talkies
8 Satlak PB Headquarters
Normal condition, activities are carried out as usual.
The sky turns cloudy, a drizzle falls and turns into rain.
Satlak PB is on standby and on alert.
Satlak PB checks the communication devices.
“Assalamualaikum, good morning to the Satlak PB
Idem 5 minutes PIC: The committee Devices: Cell phones Walkie-talkies
Halaman 16
headquarters. Agus from the Kalijompo Plantation speaking. The rainfall has reached 30 mm and water level in the Kalijompo River is 100 cm. The Kalijompo Watershed's status is banjir bandang alert. Thank you. Assalamualaikum.”
Reply from Satlak PB,”Thank you, we copy. We will follow up on your information.”
Condition Scene Setting Description Action Time Duration Notes
Status:
Standby
- Rain: 60
mm/day
- Water level:
120 cm
- Fissure: 0
9 Kalijompo
Plantation
The rain continues to
fall. Mr. Agus observes
that the rainfall
reaches 60 mm/day
and water level is 120
cm, thus the status of
the Kalijompo
Watershed is at Level
2: Standby.
Mr. Agus observes the
condition more attentively.
Mr. Agus sends information to
relevant locations by way of
walkie-talkies:
Attention, to head of the
Klungkung village, the rainfall
has reached 60 mm and water
level in the Kalijompo River is
120 cm. The Kalijompo
Watershed's status is standby
for banjir bandang. Thank you.
Assalamualaikum."
09.30-09.33 3 minutes PIC: Ebban
Devices:
Rainfall gauge
Water level
Fissure gauge
Cell phones
Walkie-talkies
10 Klungkung
Village Hall
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the village answers the
walkie-talkie.
Head of the village replies,
"Thank you, we will follow up
on the information."
Idem 3 minutes PIC: Djoko
Devices:
Cell phones
Walkie-talkies
11 Karang Pring
Village Hall
(Upstream
The rain continues
with no sign of
Head of the sub-district
answers the walkie-talkie.
Voice from the walkie-talkie:
09.33-09.36 3 minutes PIC: The
committee
Halaman 17
Status:
Standby
- Rain: 60
mm/day
- Water level:
120 cm
- Fissure: 0
Village) stopping.
The sky over the
Kalijompo Plantation
grows darker.
“Attention, to head of the Karang Pring village, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is standby for banjir bandang. Thank you. Assalamualaikum." Head of the village replies, "Thank you, we will follow up on the information."
Devices:
Cell phones
Walkie-talkies
12 Sukorambi District
The rain continues
with no sign of
stopping. The sky over the
Kalijompo Plantation grows darker.
Head of the district answers the
walkie-talkie. Voice from the walkie-talkie:
“Attention, to head of the Sukorambi District, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is standby for banjir bandang. Thank you. Assalamualaikum." Head of the district replies, "Thank you, we will follow up on the information.”
09.36-09.39 3 minutes PIC: The committee Devices: Cell phones Walkie-talkies
13 Slawu Sub-District (Downstream Village)
The rain continues
with no sign of
stopping. The sky over the
Kalijompo Plantation grows darker.
Head of the sub-district
answers the walkie-talkie. Voice from the walkie-talkie:
“Attention, to head of the Slawu Sub-District, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is standby for banjir bandang. Thank you. Assalamualaikum." Head of the sub-district replies, "Thank you, we will follow up on the information.”
09.39-09.41 3 minutes PIC: The committee Devices: Cell phones Walkie-talkies
Halaman 18
Status:
Standby
- Rain: 60
mm/day
- Water level:
120 cm
- Fissure: 0
14 Gebang Poreng Sub-District (Downstream Village)
The rain continues
with no sign of
stopping. The sky over the
Kalijompo Plantation grows darker.
Head of the sub-district
answers the walkie-talkie. Voice from the walkie-talkie:
“Attention, to head of the Gebang Poreng Sub-District, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is standby for banjir bandang. Thank you. Assalamualaikum." Head of the sub-district replies, "Thank you, we will follow up on the information.”
09.41-09.44 3 minutes PIC: The committee Devices: Cell phones Walkie-talkies
15 Patrang
District
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the district answers the
walkie-talkie. Voice from the walkie-talkie:
“Attention, to head of the Patrang District, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is standby for banjir bandang. Thank you. Assalamualaikum."
Head of the district replies, "Thank
you, we will follow up on the
information.”
09.44-09.47 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
16 Satlak PB
Headquarters,
Jember
Regency
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
HQ staff answers the walkie-
talkie.
Voice from the walkie-talkie:
“Attention, to the Satlak PB Headquarters, the rainfall has reached 60 mm and water level in the Kalijompo River is 120 cm. The Kalijompo Watershed's status is
09.47-09.50 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
Halaman 19
standby for banjir bandang. Thank you. Assalamualaikum."
Satlak HQ replies, "Thank you, we
will follow up on the information.”
Condition Scene Setting Description Action Time Duration Notes
Status:
Approaching
Banjir
Bandang
- Rain: 60
mm/day
- Water level:
120 cm
- Fissure: 0
17 Klungkung
Village Hall
The rain continues
with no sign of
stopping.
Head of the
Klungkung Village
relays information
from Mr. Agus to a
community leader (Mr.
Abdurrahman) and
asks him to
disseminate the
information.
Mr Husin relays the
information to the
head of the Sukorambi
District.
Head of the Klungkung Village
speaks to the walkie-talkie:
“Assalamualaikum, Mr.
Abdurrahman, head of the
Klungkung Village speaking. Mr.
Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is approaching
banjir bandang. Please inform
all residents, especially those
residing near the river, to
prepare for evacuation. Thank
you, assalamualaikum.”
“Assalamualaikum, to the head
of the District, head of the
Klungkung Village speaking. Mr.
Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is approaching
banjir bandang. Thank you,
assalamualaikum.”
Mr. Husin sounds the
kentongan four times in a row
09.50-09.53
09.53-09.56
09.56-09.58
3 minutes
3 minutes
PIC: Djoko
Devices:
Cell phones
Walkie-talkies
Kentongan
(bamboo/
wooden drum
for sounding
the alarm)
Halaman 20
Mr. Husin sounds the
kentongan to warn for
flood.
2 minutes
Condition Scene Setting Description Action Time Duration Notes
Status:
Approaching
Banjir
Bandang
- Rain: 60
mm/day
- Water level:
120 cm - Fissure: 0
18 Mosque/ Community Leader from Upstream
People are arriving at the mosque although it is not yet prayer time. There is an announcement from the loudspeaker.
Mr. Abdurrahman enters the mosque, turns on the microphone, and speaks: “Assalamualaikum warahmatullahi wabarakatuh. Attention, all residents, the status of the Kalijompo Watershed is approaching banjir bandang. To all residents, please prepare for evacuation."
09.56-10.00 4 minutes PIC: Mr. Imam Devices: Megaphone Microphone
19 Head of the Karang Pring village
The rain continues with no sign of stopping.
Head of the Karang Pring Village relays the information from Mr. Agus to community leaders (Rahmatullah/ Nuryanto) and asks them to disseminate the information.
Ms. Rita, head of the Karang Pring village,
Head of the Karang Pring Village speaks to the walkie-talkie: “Assalamualaikum, Mr. Rahmatullah/Nuryanto, head of the Klungkung Village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Please inform all residents, especially those residing near the river, to prepare for evacuation. Thank you, assalamualaikum.”
“Assalamualaikum, to the head of the District, head of the Karang Pring Village speaking. Mr. Agus from the Kalijompo
10.00-10.03
10.03-10.06
3 minutes
3 minutes
Halaman 21
relays the information to the head of the Sukorambi District.
Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Thank you, assalamualaikum.”
20 Karang Pring community leaders
Karang Pring community leaders enter the mosque, turn on the microphone, and speak: “Assalamualaikum warahmatullahi wabarakatuh. Attention, all residents, the status of the Kalijompo Watershed is approaching banjir bandang. To all residents, please prepare for evacuation.”
10.06-10.09 3 minutes
21 Head of the Slawu Sub-District
The rain continues with no sign of stopping.
Head of the Slawu Village relays the information from Mr. Agus to community leaders (Fathor/Ali) and asks them to disseminate the information.
Head of the Slawu Sub-District relays the information to the head of the Patrang District.
Head of the Slawu Sub-District
speaks to the walkie-talkie: “Assalamualaikum, Mr. Fathor/Ali, head of the Slawu Village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Please inform all residents, especially those residing near the river, to prepare for evacuation. Thank you, assalamualaikum.”
“Assalamualaikum, to the head of the District, head of the Slawu Village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Thank you, assalamualaikum.”
`10.09-10.12
10.12-10.14.
3 minutes
2 minutes
Halaman 22
22 Slawu
community leader
Slawu community leaders enter the mosque, turn on the microphone, and speak: “Assalamualaikum warahmatullahi wabarakatuh. Attention, all residents, the status of the Kalijompo Watershed is approaching banjir bandang. To all residents, please prepare for evacuation.”
10.14-10.17 3 minutes
23 Head of the Gebang Poreng Sub-District
The rain continues with no sign of stopping.
Head of the Gebang Poreng Sub-District relays the information from Mr. Agus to community leaders (Heri/Joko) and asks them to disseminate the information.
- Head of the Gebang Poreng Sub-District relays the information to the head of the Patrang District.
Head of the Gebang Poreng
Sub-District speaks to the
walkie-talkie: “Assalamualaikum, Mr. Heri/Joko, head of the Gebang Poreng Village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Please inform all residents, especially those residing near the river, to prepare for evacuation. Thank you, assalamualaikum.”
“Assalamualaikum, to the head of the District, head of the Gebang Poreng Sub-District speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is approaching banjir bandang. Thank you, assalamualaikum.”
10.17.10.20
10.20-10.23
3 minutes
3 minutes
Condition Scene Setting Description Action Time Durastion Notes 24 Gebang
Poreng Gebang Poreng community
leaders enter the mosque, turn 10.23-10.26
3 minutes
Halaman 23
Community Leaders
on the microphone, and speak: “Assalamualaikum warahmatullahi wabarakatuh. Attention, all residents, the status of the Kalijompo Watershed is approaching banjir bandang. To all residents, please prepare for evacuation.”
Status: Evacuation
- Rain: 90
mm/day
- Water level:
140 cm - Fissure: 2
25 Kalijompo Plantation
The rain continues with no sign of stopping. Mr. Agus observes that the rainfall reaches 90 mm/day and water level is 120 cm. There is a fissure of 2 mm/hour.
The status of the Kalijompo Watershed is at Level 3: Evacuation.
Mr. Agus monitors the condition more attentively.
Mr. Agus asks Mr. Idih and Mr. Sukardi to lead the residents toward the temporary safe points at the evacuation site by sounding the kentongan. “Mr. Idih and Mr. Sukardi, please evacuate the residents and lead them to the safe points.”
Mr. Agus sends information to relevant parties via walkie-talkies: “Assalamualaikum, to the head of the Klungkung village, the rainfall has reached 90 mm and water level in the Kalijompo River is 140 cm, with a fissure of 2 mm/hour. The Kalijompo Watershed's status is evacuation from banjir bandang. Thank you.”
10.26-10.29 3 minutes PIC: Ebban Devices: Rainfall gauge Water level
gauge Fissure gauge Cell phones Walkie-talkies
Status: Evacuation
- Rain: 90
mm/day
- Water level:
140 cm
26 Klungkung
Village Hall
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the village answers the
walkie-talkie.
10.29-10.32 3 minutes PIC: Djoko
Device:
Cell phones
Walkie-talkies
27 Karang Pring The rain continues Head of the village answers the 10.32-10.35 3 minutes PIC: The
Halaman 24
- Fissure: 2
Village Hall
(Upstream
Village)
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
walkie-talkie.
Voice from the walkie-talkie:
“Assalamualaikum, to the head of
the Klungkung Village, the rainfall
has reached 90 mm and water level
in the Kalijompo River is 140 cm,
with a fissure of 2 mm/hour. The
Kalijompo Watershed's status is
evacuation from banjir bandang.
Thank you. Assalamualaikum.”
“Information received.”
committee
Device:
Cell phones
Walkie-talkies
28 Sukorambi
District
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the Sukorambi District
answers the walkie-talkie.
Voice from the walkie-talkie:
“Assalamualaikum, to the head of
the Sukorambi District, the rainfall
has reached 90 mm and water level
in the Kalijompo River is 140 cm,
with a fissure of 2 mm/hour. The
Kalijompo Watershed's status is
evacuation from banjir bandang.
Thank you. Assalamualaikum.”
10.35-10.38 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
Halaman 25
29 Slawu Sub-
District
(Downstream
Village)
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the sub-district
answers the walkie-talkie.
Voice from the walkie-talkie:
“Assalamualaikum, to the head of
the Slawu Sub-District, the rainfall
has reached 90 mm and water level
in the Kalijompo River is 140 cm,
with a fissure of 2 mm/hour. The
Kalijompo Watershed's status is
evacuation from banjir bandang.
Thank you. Assalamualaikum.”
10.38-10.41 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
Status: Evacuation
- Rain: 90
mm/day
- Water level:
140 cm
- Fissure: 2
30 Gebang
Poreng Sub-
District
(Downstream
Village)
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the sub-district
answers the walkie-talkie.
Voice from the walkie-talkie:
“Assalamualaikum, to the head of
the Gebang Poreng sub-district, the rainfall has reached 90 mm and
water level in the Kalijompo River is
140 cm, with a fissure of 2
mm/hour. The Kalijompo
Watershed's status is evacuation
from banjir bandang. Thank you.
Assalamualaikum.”
10.41-10.44 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
31 Patrang
District
The rain continues
with no sign of
stopping.
The sky over the
Kalijompo Plantation
grows darker.
Head of the district answers the
walkie-talkie.
Voice from the walkie-talkie:
“Assalamualaikum, to the head of
the Patrang District, the rainfall has
reached 90 mm and water level in
the Kalijompo River is 140 cm, with
a fissure of 2 mm/hour. The
Kalijompo Watershed's status is
10.44-10.47 3 minutes PIC: The
committee
Devices:
Cell phones
Walkie-talkies
Halaman 26
evacuation from banjir bandang.
Thank you. Assalamualaikum.” 32 Satlak PB
Headquarters, Jember Regency
The rain continues
with no sign of
stopping. The sky over the
Kalijompo Plantation grows darker.
HQ staff answers the walkie-
talkie.
Voice from the walkie-talkie: “Assalamualaikum, to the staff at the Satlak PB HQ, the rainfall has reached 90 mm and water level in the Kalijompo River is 140 cm, with a fissure of 2 mm/hour. The Kalijompo Watershed's status is evacuation from banjir bandang. Thank you. Assalamualaikum.”
10.47-10.50 3 minutes PIC: The committee
Devices:
Cell phones Walkie-talkies
Status: Evacuation
- Rain: 90
mm/day
- Water level:
140 cm
- Fissure: 2
33 Klungkung Village Hall
The rain continues with no sign of stopping.
Head of the Klungkung Village relays information from Mr. Agus to a community leader (Mr. Abdurrahman) and asks him to announce to the residents that the evacuation has begun.
Mr. Husin relays the information to the head of the Sukorambi District.
Head of the Klungkung Village speaks to the walkie-talkie:
“Assalamualaikum, Mr. Abdurrahman, the head of the Klungkung village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is evacuation from banjir bandang. Please inform all residents, especially those residing near the river, to start evacuating toward the meeting point and leave together for the evacuation site. Thank you." “Assalamualaikum, to the head of the District, head of the Klungkung Village speaking. Mr. Agus from the Kalijompo Plantation informed me that the status of the Kalijompo Watershed is evacuation from banjir bandang. Thank you, assalamualaikum.”
Mr. Husin sounds the
10.50-10.55
10.55-10.58
5 minutes
3 minutes
PIC: Djoko
Devices:
Cell phones Walkie-talkies Kentongan
Halaman 27
Mr. Husin sounds the kentongan to warn for flood
kentongan four times in a row. 10.58-11.00
2 minutes
Condition Scene Setting Description Action Time Duration Notes
Status: Evacuation
- Rain: 90
mm/day
- Water level:
140 cm
- Fissure: 2
34 Mosque/ Community Leader from Upstream
People are arriving at the mosque although it is not yet prayer time. There is an announcement from the loudspeaker.
Mr. Abdurrahman is still at the
mosque. He speaks into the
microphone: “Assalamualaikum
warahmatullahi wabarakatuh.
Attention, all residents, the
status of the Kalijompo
Watershed is evacuation from
banjir bandang. Please inform
all residents, especially those
residing near the river, to start
evacuating toward the meeting
point and leave together for the
evacuation site. Thank you,
assalamualaikum.”
11.00-11.04 4 minutes PIC: Mr. Imam
Devices:
Megaphone
Microphone
35 Karang Pring
Village Hall
The rain continues
with no sign of
stopping.
Head of the Karang
Pring Village relays
information from Mr.
Agus to a community
leader (Mr.
Abdurrahman) and
Head of the Karang Pring
village speaks to the walkie-
talkie:
“Assalamualaikum, head of the
Karang Pring village speaking.
Mr. Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is evacuation from
11.04-11.08 4 minutes
Halaman 28
asks him to ask the
residents to start
evacuating.
Ms. Rita, head of the
Karang Pring village,
relays the information
to the head of the
Sukorambi District.
banjir bandang. Please inform
all residents, especially those
residing near the river, to start
evacuating toward the meeting
point and leave together for the
evacuation site. Thank you,
assalamualaikum.”
“Assalamualaikum, to the head
of the District, head of the
Karang Pring Village speaking.
Mr. Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is evacuation from
banjir bandang. Thank you,
assalamualaikum.”
36 Slawu Village
Hall
The rain continues
with no sign of
stopping.
Head of the Slawu
Sub-District relays
information from Mr.
Agus to community
leaders and asks them
to ask the residents to
start evacuating.
Head of the Slawu Village
speaks to the walkie-talkie:
“Assalamualaikum, the head of
the Slawu village speaking. Mr.
Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is evacuation from
banjir bandang. Please inform
all residents, especially those
residing near the river, to start
evacuating toward the meeting
point and leave together for the
evacuation site. Thank you,
assalamualaikum.”
“Assalamualaikum, to the head
11.08-11.12 4 minutes
Halaman 29
Head of the Slawu
Sub-District relays the
information to the
head of the Patrang
District.
of the District, head of the
Slawu Sub-District speaking. Mr.
Agus from the Kalijompo
Plantation informed me that the
status of the Kalijompo
Watershed is evacuation from
banjir bandang. Thank you,
assalamualaikum.”
37 Gebang
Poreng Village
Hall
The rain continues with no sign of stopping.
Head of the Gebang
Poreng Sub-District
relays information
from Mr. Agus to
community leaders
and asks them to ask
the residents to start
evacuating.
Head of the Gebang
Poreng Sub-District
relays the information
Head of the Gebang Poreng
Sub-District speaks to the
walkie-talkie:
“Assalamualaikum, head of the
Gebang Poreng village
speaking. Mr. Agus from the
Kalijompo Plantation informed
me that the status of the
Kalijompo Watershed is
evacuation from banjir
bandang. Please inform all
residents, especially those
residing near the river, to start
evacuating toward the meeting
point and leave together for the
evacuation site. Thank you,
assalamualaikum.”
“Assalamualaikum, to the head
of the District, head of the
Gebang Poreng Sub-District
speaking. Mr. Agus from the
Kalijompo Plantation informed
me that the status of the
Kalijompo Watershed is
11.12-11.16 4 minutes
Halaman 30
to the head of the
Patrang District.
evacuation from banjir
bandang. Thank you,
assalamualaikum.”
38 Satlak PB
Command
Posts at the
villages
Satlak PB from the
district and regency
arrive at the Satlak PB
Command Posts at the
villages to coordinate
with and assist the
residents in
evacuating.
Satlak personnels divide tasks to
assist the residents in
evacuating.
11.16-11.20 4 minutes
39 Meeting point Village residents arrive
from all directions,
carrying survival kits
for their stay at the
shelters. Senior
citizens, pregnant
women, and the sick
are supported as they
walk or transported on
stretchers. Adults carry
small children in their
arms.
- The residents gather at the
meeting point.
11.20-11.25 5 minutes
40 At the
evacuation site
The tents have been
erected:
1. Evacuation
command post
2. Tents for men
3. Tents for women
4. Tent for medics
5. Logistics tent
6. Public kitchen tent
Activities at each tent 11.25-11.35 10 minutes
Halaman 31
7. Washroom for
men
8. Washroom for
women
- The shelter is under
Satlak's centralized
command. Satlak gives
out orders to gather
data, make a list of the
refugees' needs,
provide medical care,
and so forth.
Condition Scene Setting Description Action Time Duration Notes
Status:
Critical-
Dangerous
- Rainfall: 120
-150
mm/day
- Water level:
180 cm
- Fissure: 9
41 Kalijompo
Plantation
- Heavy rain is still
falling; landslides and
debris flow begin.
- Kalijompo plantation
residents are secure at
the shelter and the
evacuation of the
Kalijompo residents is
complete.
- The number and types
of the refugees' needs
are listed.
Kalijompo informs Satlak and
the district that there are
[number of] refugees at the
safe points and they are in need
of [types of needs]. They may
be relocated to another
evacuation point.
11.35-11.40 5 minutes
42 Klungkung
Village
- Heavy rain is still
falling; landslides and
debris flow begin.
- Refugees move from
the meeting point to
the evacuation point.
- Heads of villages and
community leaders lead the
refugees from the meeting
point to the evacuation point,
with the help of Satlak (Babinsa,
etc)
11.40-11.45 5 minutes Kentongan,
megaphone
43 Karang Pring - Heavy rain is still - Heads of villages and 11.45-11.50 5 minutes Kentongan,
Halaman 32
Village falling; landslides and
debris flow begin.
- Refugees move from
the meeting point to
the evacuation point.
community leaders lead the
refugees from the meeting
point to the evacuation point,
with the help of Satlak (Babinsa,
etc).
megaphone
44 Slawu Village - Heavy rain is still
falling; landslides and
debris flow begin.
- Refugees move from
the meeting point to
the evacuation point.
- Heads of villages and
community leaders lead the
refugees from the meeting
point to the evacuation point,
with the help of Satlak (Babinsa,
etc).
11.50.11.55 5 minutes Kentongan,
megaphone
45 Gebang
Poreng Village
- Heavy rain is still
falling; landslides and
debris flow begin.
Refugees move from
the meeting point to
the evacuation point.
- Heads of villages and
community leaders lead the
refugees from the meeting
point to the evacuation point,
with the help of Satlak (Babinsa,
etc).
11.55-12.00 5 minutes Kentongan,
megaphone
Condition Scene Setting Description Action Time Duration Notes
Status:
Critical-
Dangerous
- Rainfall: 120
-150
mm/day
- Water level:
180 cm
- Fissure: 9
46 Sukorambi
and Patrang
Districts
- Leaders arrive at the
evacuation point to
check on the refugees.
- Leaders report to the
Regency Satlak.
- Heads of villages and
community leaders lead the
refugees from the meeting
point to the evacuation point,
with the help of Satlak (Babinsa,
etc).
12.05-12.10 5 minutes Kentongan,
megaphone
47 Regency
Satlak
- Leaders assist in the
move from point to
point, assisting the
refugees, coordinating
with each other.
- Leaders provide solace
for the refugees until
the situation is safe.
- Leaders give instructions to the
refugees in the evacuation site.
Speech from Satlak leader/vice-
leader, "Ladies and gentlemen,
we from Satlak... You can all
return to your homes after the
situation is confirmed to be
safe. Currently our personnels
12.10-12.20 10 minutes Megaphone
Halaman 34
ACTIVITIES
Preparation
Activity preparation starts with the composition of the simulation scenario, and
the activities start after the JICA and YPS cooperation is agreed upon. On October 17,
2011, the simulation scenario is drafted based on the SOP for the Kalijompo Watershed.
The banjir bandang statuses, key participants, and instruments are written in reference
to the SOP.
The following day, on October 18, 2011, YPM consulted with the key staff at the
Kalijompo Watershed: Bakesbang Limnas (National Unity, Political and Public Protection
Board) in Jember, Sukorambi District, Klungkung Village, and Kalijompo Plantation.
They discussed activity plans and YPM invited the key staff to participate in the activities.
During the next two days, October 19-20, 2011, YPM coordinated with all the
parties involved in the activities. YPM presented a report on the consultation and
discussion of the previous day, and handed out invitations in cooperation with the
Public Welfare Division of the Jember Regency. All invitations were delivered to the
relevant off ices, and heads of villages deliver the invitations to the communities and
community leaders. Village and district off icials, as well as community representatives,
are also invited to attend the brief ing and simulation training on October 21, and the
simulation on October 23.
On Friday, October 21, 2011, YPM held the brief ing and simulation training with
27 attendees (attendance list attached): Klungkung Village off icials, community
representatives from Krajan and Gendir Hamlets, the Kalijompo Plantation
administration staff and community representatives, JICA, and YPM. Activity
mechanisms and simulation scenario were discussed in the meeting, which went well
and in which all attendees actively participated. Many of the questions and feedback
contribute to a better arranged activity preparation.
Halaman 35
On the following day, Saturday, October 22, 2011, YPM conducted the f inal
preparation with 30 attendees (attendance list attached): Klungkung Village off icials,
community representatives from Krajan and Gendir Hamlets, the Kalijompo Plantation
administration staff and community representatives, JICA, and YPM. Three plans were
made during the meeting: for preparing the location map and instruments in the
morning, for the initial training during the day, and for the f inal training in the late
afternoon. However, the location map and instruments were not yet prepared in the
morning; after the guests arrived, instruments and scene simulations in the scenario
were inspected. During the day, tents were set up to represent locations at the
Kalijompo Watershed and relevant administrative off ices in accordance with the
location map. The simulation preparation had been completed at this meeting.
Participants understand what they must do during the simulation on the following day,
and they were willing to take part in a pre-simulation rehearsal. In the afternoon, the
location and instruments were ready for use.
The f inal simulation preparation was held on Sunday morning, October 23,
2011, and the location and instruments were inspected. The rehearsal was supposed to
start at 7.30 a.m. However, none of the participants were present at that hour, therefore
the rehearsal was cancelled.
As the f inal preparation, YPM as the committee made a list of the participants
and guests before they entered the simulation location at the Klungkung village square.
The purpose is to conf irm that all participants and guests were present and accounted
for, and to organize them into the tents as specif ied in the location map. The
preparation started at 8.30 and ended at 9.30, and the opening ceremony began.
Opening Ceremony
The opening ceremony started at 9.30 a.m. with Ms. Rokhani as the master of
ceremony. The scheduled activities for the opening ceremony were then announced.
1. Opening
Halaman 36
2. Preamble from the Director of YPM (Dr. Evita Soliha Hani)
3. Preamble from the Ministry of Public Works (Mr. Haryono Utomo)
4. Preamble from JICA (Mr. Ueno Toshiyasu)
5. Preamble from the Head of Bakesbangpol Linmas Jember (Drs. Edy Budi Susilo,
M.Si) which signals the start of the simulation training.
Preamble from Ms. Rokhani as the MC
The evacuation training based on the SOP for the Kalijompo Watershed in the
Klungkung Village is organized by YPM, JICA, and the Jember Regency government,
and conducted in the Klungkung Village on Sunday, October 23, 2011. The training will
begin shortly. May we present Dr. Evita Soliha Hani, the Director of YPM.
Preamble from the Director of YPM, Dr. Evita Soliha Hani.
Assalamualaikum Warahmatullahi Wabarakatuh.
Good morning and may God's blessings be upon us all. Our thanks and gratitude to
the Almighty God for blessing us and our activities here today. The SOP for the
Kalijompo Watershed is the blueprint for restorations in other watersheds in Jember,
the f inal objective of which is banjir bandang management.
Preamble from the Ministry of Public Works, delivered by Mr. Haryono Utomo
Assalamualaikum Warahmatullahi Wabarakatuh.
Good residents of the Klungkung Village, good morning. I see that you are all in good
health and ready for the evacuation simulation. An evacuation simulation is a training
session or game to prepare us in managing banjir bandang at all times. Trainings
prepare us for floods, and with preparations we'll be able to avoid disasters like the
ones in 2006, in Panti and the Dinoyo River. If we are prepared, we will be able to
survive banjir bandang, God willing.
Halaman 37
I request that you cooperate with the government in preparing for and against banjir
bandang. Please keep the currently available facilities well-maintained and functioning
properly. If you see any damage in the facilities, please report to the nearest sub-dictrict
and district off icials. Let us pray that today's training will go as planned, God willing.
The purpose of the simulation is to establish a system or work procedure in preparation
of and against banjir bandang,
Thank you, and let us start the training.
Wassalamualaikum Warahmatullahi Wabarakatuh.
Preamble from JICA, delivered by Mr. Ueno Toshiyasu
Good morning.
I am an expert in banjir bandang mitigation from JICA. Last year JICA installed a rainfall
gauge and water level gauge at the Kalijompo Watershed through a Table Top Exercise
(TTE) simulation in order to manage banjir bandang. Simulations and TTE in Kalijompo
resulted in a Standard Operating Procedure (SOP) for the Kalijompo Watershed that will
be used in banjir bandang management in Kalijompo. The purpose of today's training,
which takes place in the Klungkung Village, Sukorambi District, is to train residents in
implementing the banjir bandang early warning system. The reason is that early
warnings are crucial and can save lives. It is JICA's hope that, after this training,
residents will understand how to evacuate during banjir bandang.
Preamble from the Head of Bakesbangpol Linmas Jember, Drs. Edy Budi Susilo, M.Si.
Assalamualaikum Warahmatullahi Wabarakatuh.
To my esteemed colleagues, Mr. Haryono Utomo, JICA, YPM, Muspika members from
the Sukorambi, Patrang, and Slawu Districts, and fellow residents. It is a blessing that we
are gathered here this morning. We are likewise blessed with an abundance of water,
and as part of our faith we must preserve the water and prepare ourselves for water-
related disasters. Therefore it is our hope that, through this simulation, we will become
Halaman 38
more familiar with the preparations for disaster. We should know who to report to and
which we should evacuate f irst, ourselves or our property. The government wishes for
the residents to understand what to do during banjir bandang and what the risks are.
During the simulation, please carry out the steps as if there is a real flood happening
right now. It is important to know who and where to report to during banjir bandang.
Then, during the training, you shall be able to inform your relatives, families, and
neighbors about banjir bandang management. The training is a follow-up on the FGD
(focused group discussion) and TTE that led to the SOP which will be recommended to
other watersheds in the Jember Regency.
We wish to thank Mr. Yoshida and Mr. Ueda for their research during the past three
years in banjir bandang preparations in order to operate the current instruments in
banjir bandang control. Let us all continue and pray for God's blessings, and start the
training.
Wassalamualaikum warahmatullahi wabarakatuh
Simulation
The simulation began at 10 a.m. Rokhani, SP, M.Si from YPM will recite the
schedule and supervise the activities. Below is the list of key participants for each post
at the Kalijompo Watershed:
1. Monitoring Kalijompo Upstream Mr. Agus (administrator of
the Kalijompo Plantation)
2. Kalijompo Community Leaders 1. Idih Mulyono
2. Sukardi
.3. Klungkung Vilage Off icial (Upstream Village) Joko Mahsono (village
secretary)
4. Klungkung Village Community Leader Abdurrahman
5. Karang Pring Village Off icial (Upstream Village) Atik Kusmiati (Facilitator from
YPM)
Halaman 39
6. Karang Pring Community Leader (Upstream
Village)
Rahmatullah
7. Slawu Village Off icial (Downstream Village) Imam Syaf i’i (Facilitator from
YPM)
8. Slawu Community Leader (Downstream Village) Fathorrozi
9. Gebang Poreng Village Off icial (Downstream
Village)
Imam S.
10. Gebang Poreng Community Leader
(Downstream Village)
Hamim
11. Sukorambi District Haidori (head of the district)
12. Patrang District Bambang Irawan (Military
Resor Command)
13 Regency Satlak Heri Setiawan (head of the
Limnas division in Bakesbang)
Overall, the simulation went well with no communication problems. All
participants did their job correctly, especially key participants from the Kalijompo
Plantation, Klungkung Village, Karang Pring Village, Slawu Sub-District, Gebang Sub-
District, Sukorambi District, Patrang District, and Satlak PBP from the Jember Regency.
The communication progressed according to the scenario based on the SOP for the
Kalijompo Watershed.
Most of the residents taking part in the simulation came from the Klungkung
Village, where the simulation took place. There were also representatives from the
Karang Pring Village, Slawu District, and Gebang District. The simulation also serves as
a means of communication between upstream and downstream villages, in order to
Halaman 40
create better coordination and communication in the future, especially during
landslides and banjir bandang.
The instruments used functioned in accordance with the SOP for the Kalijompo
Watershed. The early warning system instruments installed at the Kalijompo Plantation,
the water level sensor and rainfall sensor, were also installed at the simulation location.
Using these instruments, the community can receive information on and detect the
signs of banjir bandang. The early warning system communication devices that were
also used in the simulation are walkie-talkies in place of cell phones, megaphones in
place of loudspeakers, and kentongan.
The constraints encountered during the simulation are:
a. Limited preparation time (one week) results in inadequate planning and
coordination. The key participants from four villages located in two districts required
more time for preparation.
b. Not all activity plans could be carried out because not all participants were present.
The brief ing and simulation training on Friday, October 21, 2011, should have been
attended by representatives from all villages. Instead, only participants from the
Klungkung Village and Kalijompo Plantation were present. The initial training was
also attended only by participants from two locations, although in greater number.
c. The participants had no strong commitment to the evacuation simulation, despite
the maximum amount of coordination. Invitations were sent to all the parties
included in the SOP for the Kalijompo Watershed, both by mail and via personal
delivery by the committee. Village and district off icials were sent special invitations
in order to ensure their presence. Nevertheless, only some of them were present on
the simulation day. This indicates their lack of commitment to be involved in banjir
bandang management at the Kalijompo Watershed.
Halaman 41
However, the abovementioned constraints did not hinder the activities from
going according to plan. Participants carry out the following steps as stated in the
scenario:
1. Scene 1 was carried out correctly. Mr. Agus (Kaljompo Plantation) informed
everyone of the condition in the upstream Kalijompo River.
2. Scene2 to scene 16 were carried out correctly. Village off icials from the Klungkung
and Karang Pring Villages, Sukorambi and Patrang District, and Satlak PBP from the
Jember Regency received and responded to information from Mr. Agus correctly.
3. Scene 17 was initially carried out correctly. Later, however, the irregular yet
persistent sound of kentongan incited panic among the participants, and they
evacuated when the status was still standby.
4. Scene 18 to scene 24 were bypassed because participants had already evacuated,
and the next scene was evacuation.
5. Scene 25 to scene 40, evacuation, were carried out correctly.
6. Scene 41 to scene 48, critical-dangerous, were carried out correctly.
EVALUATION
Evaluation by the Committee
The committee has noted the following from the simulation:
a. The preparation is inadequate due to limited time, which also results in a lack of
coordination among the parties whose commitment is not very strong to begin
with.
b. The simulation is not intensive enough because there was only one brief ing (on
October 21, 2011) and one rehearsal (on October 22, 2011). The brief ing at the
beginning of the simulation did not result in a proper simulation.
Halaman 42
c. Not all participants, especially those who participated in the TTE (Table Top Exercise),
were present. The key participants were absent when they could have taken charge
of the activities. The lack of rehearsal and human resources are among the several
constraints in the simulation.
d. One of the early warning system instruments, kentongan, is ineffective. Although it
is a traditional and useful warning instrument, the time and place of use should be
reconsidered because it is not entirely suitable for evacuation purposes.
Evaluation by Various Parties
1. Evaluation by the Director of YPM (Dr. Evita Soliha Hani)
Assalamualaikum warahmatullahi wabarakaatuh,
We would like to thank everyone, especially the community, for their
participation in the simulation. Despite the shortcomings, we expect further
accomplishments in the next simulation. Thank you for your wholehearted participation
and being willing to pretend to run, even the elderly. We hope today's evacuation
simulation will be useful in mitigating disaster risks.
Wabillahi tauf iq wal hidayah wassalamua’alaikum warahmatullahi wabarakaatuh.
2. Evaluation by JICA (Mr. Uchida Yoshida)
We would like to thank everyone for your hard work. Our assessment is that the
evacuation simulation went too fast. In real life, an evacuation takes a very long time.
The logistics during banjir bandang would also take a very long time; transporting
supplies to evacuation sites takes much longer because the roads are harder to travel
across. In a real evacuation, refugees may not receive food on the same day,
particularly when there are obstacles on the roads. JICA would like to remind everyone
to be prepared to rescue and sustain themselves during disasters. Everyone must be
safe and the death rate must be kept at zero. Thank you.
Halaman 43
3. Evaluation by Satlak PBP (Drs. Edy Budi Susilo, M.Si.)
Assalamualaikum warahmatullahi wabarakaatuh,
We would like to thank everyone for your participation. Our assessment is that
the simulation went quite well. The community and participants - Satlak, the district
off icials, military resor command, police department, village off icials, and the plantation
- have carried out the simulation properly. However, the following should be improved:
1. Communication devices
The communication devices are inadequate. Satlak and Muspika must establish
better and more effective communication methods.
2. Different understandings of information
The sounding of the kentongan should not confuse the evacuees. For instance,
they think that sounding the kentongan twice means flood, and yet it means theft or
f ire. Do not sound the kentongan repeatedly like you would a musical instrument.
There must be a mutual agreement about how the kentongan is sounded to indicate
natural disasters such as flood.
3. SOP
The head of the district issued a decree on Kader Masyarakat Siaga (Vigilant
Community Cadre). The cadre will develop and disseminate information on the SOP in
public meetings to familiarize the public with the banjir bandang early warning system.
The key sentence in this activity is: we do not hope for disaster, thus the SOP for
the banjir bandang early warning system must be publicly understood and put into
practice. For instance, evacuate the people f irst instead of the cattle, because we must
prioritize human lives. The activities involve all stakeholders, and all parties must
participate in them and cooperate.
JICA and YPM will provide guidance only for a limited time. In the end, disaster
management depends on Satlak PB from the Jember Regency and the community; the
lessons they have learned thus far must be improved. After receiving the decree from
the head of the district, the cadre must start working. If not, they must be replaced with
Halaman 44
a new cadre. Off icials must be vigilant and aware of the information route for the banjir
bandang early warning system at the Kalijompo Watershed. This includes the names,
addresses, and contact details of the persons who relay the information. Off icials must
also be familiar with evacuation meeting points and evacuation sites, as well as with the
implementation of evacuation methods. The point is that comprehensive knowledge
and constant exercises are obligatory. Similar activities are also required in other
locations, such as the Silo District.
5. Evaluation by the Ministry of Public Works (Haryono Utomo)
Assalamualaikum warahmatullahi wabarakaatuh,
Trainings are useful in familiarizing the public with the technicalities of
evacuation, and should be conducted at the beginning of the rain season. The public
should not depend on YPM, JICA, or the local government, but conduct the trainings
independently, thus preparing for disasters through their own efforts.
A single map detailing evacuation routes is required, and copies of it must be
distributed to public places such as schools, sub-district off ices, and neighborhood
association/council off ices, to familiarize the public with disaster management. Sleman
provides a good example, in that evacuation maps are available in public places. These
maps show the meeting points, evacuation sites, and safe areas. The locations are
marked with flags tied on high poles or on tall trees. During a flood, evacuees will
quickly see which locations are safe and which should be avoided. Yellow flags, for
instance, indicate safe areas, white flags indicate the f inal evacuation site, and red flags
indicate disaster-prone areas.
Simulation activities should be made as similar to the real situation as possible.
When banjir bandang strikes, participants must act fast and choose succinct words to
relay information, in order to avoid different interpretations and create quick and
integrated understanding among evacuees. Since the purpose of simulation is to test
and examine the SOP, all parties may make suggestions and review the SOP as
Halaman 45
participants. The SOP will become a prototype for other locations while taking local
conditions into account.
Previous experience shows that it is easy to determine safe and easily accessible
locations in mountain slopes. But during the simulation, ladies wearing jarik (traditional
cloth for covering the lower body) could not move too freely, which we did not
anticipate. The public must work on a mutual understanding of good and continuous
disaster management, rather than wait for initiatives from the government. Thank you.
Wassalamualaikum warahmatullahi wabarakatuh.
6. Written evaluation from Mr. Lesto Kusumo (Ministry of Public Works)
a. The terminology in the SOP must be explained. More than a schema with names
attached to it, the SOP must also detail the meeting points, evacuation points,
overview of the region, and vital points.
b. Instead of the word Alert, use Vigilant, Ready, and Standby/Evacuation.
c. In the event of a real disaster, change the disaster’s name or add “banjir bandang”
to it.
d. Evacuation route and points should be in locations with strong infrastructures, so
that they will be easily accessible to the evacuees during banjir bandang.
RECCOMENDATION
The following recommendations are made based on the evaluation of the
simulation:
1. The following need to be revised in the SOP for the banjir bandang early warning
system at the Kalijompo Watershed:
a. Use kentongan only during evacuation. Use loudspeakers or megaphones
when the status is standby.
Halaman 46
b. Make an evacuation map that clearly shows the evacuation route, meeting
points, and evacuation sites.
c. The SOP must be updated regularly, especially the contact details of key
participants, since people have a habit of changing cell phone numbers. Key
participants who are not active, and therefore lacking in commitment, should
be replaced.
2. There needs to be a Kalijompo Watershed forum to improve and maintain general
and individual commitment. Through this forum, all key participants will be made
more active in implementing the SOP for the banjir bandang early warning system
at the Kalijompo Watershed, and discuss issues related to the Kalijompo Watershed.
3. Trainings and simulations should be held regularly, in order to improve public
knowledge of the SOP for the banjir bandang early warning system at the
Kalijompo Watershed and keep them alert.
CONCLUSION
The report of the training and evacuation simulation for the banjir bandang
early warning system in the Klungkung Village provides an overview and explanation of
the implementation. We would like to thank all parties who have assisted in the
activities. It is our hope that the public will gain further knowledge, awareness and skills
in disaster management and risk mitigation.
Halaman 61
Registration/Preparation for Evacuation Training in SOP for Kalijompo Watershed
Evacuation Training in SOP for Kalijompo Watershed: Opening Ceremony
Halaman 62
A Scene at the Banjir Bandang Early Warning System Training
Banjir Bandang Evacuation Training