Protects people and equipment from electrical accidents and minimizes trouble-shooting time
Life Protection X Life Protection ○ Life Protection ○
Device Protection X Device Protection △ Device Protection ○
Repair Time ↑↑ Repair Time ↑ Repair Time ↓
Standard Arc Proof SWGR Arc Eliminated SWGR
20
Safety & Convenience & Compact
▣ IEC 62271-200 LSC2B-PM Class Structure- Each device is isolated as compartment
- Each partition consists of grounded continuous metal
partition and shutter.
- Easy maintenance structure
▣ Various Interlock- VCB Input/Output, VCB Shutter, Earthing S/W etc.
▣ Internal Arc Protection Structure(IAC AFLR)- Structure that withstands arc explosion(up to 50kA/1s)
- Arc relief structure in Each Compartment
- Rear Door Type (No bolting) Internal Arc Protection structure
▣ Compact Design- Incoming and PT section are combined to 1 section
- Optimal design through insulation and temperature analysis
Install area
64% reduced
StandardSwitchgear(MESG)
IncomingVCB
MainPT
FeederVCB
1,200 1,200 1,200
2,3
50 Incoming
VCB+
PT
FeederVCB
800 800
2,3
50
MCSG
Metal Clad SwitchGear
Busbar Com.
C.B. Com.
Cable Com.
21
50 51 51G 50 51 51G
Feeder CB
Main CB
Feeder CB
CT
CB Open
CT
CT
Arc Eliminator
Closed time ≤ 3.5ms
OpticalSensor
OpticalSensor
CTRelay
CB
Arc Protection Relay
Time ≤ 1.5ms
51 51G
Arc current
Total arc quenching time
1.5(APR) + 3.5(AE) = 5ms
100 200 400 500 ms0
[ Arc Energy ]
[ Arcing Time ]
Copper Fire
Steel Fire
Pressure : 2·105
[Pa]
Temperature 20,000 [K]
Cable Fire
I2t [kA2·sec]
Max. at10~15ms
Pressure and Temp are UP Gas and Fire
Arc Protection System
22
Type Test▶
<Switchgear> <LV SWGR & M.C.C> <Bus duct>
Certificate : IBC 2003/2006, UBC 1997, IEEE 693-1997, IEC60068-3-3, UFC-3-310-01/04, ASCE 7-02, GR-63-Core,
Nch2369, AISC 325 & ASTM, IEEE 344 & IEEE 693, ASCE/SEI 7-05 etc.
Seismic Analysis Seismic Test (Vertical) Seismic Test (Horizontal)
23
Mold TRHumidity
Temperature
SWGR
UHF/VHF PD
[IR온도Sensor]
[Temp Sensor][HFCT][UHF PD Sensor]
[Thermal Sensor]
[Thermal Image]
[PD]
[Temp]
RS-485
Ethernet
RF
Measuring Sensor Configuration
24
Contacted Temp Sensor Thermal Imaging Camera CB attached Temp Sensor
IR Sensor
▼ Smart LV Software Monitoring
◀ Mobile AppMonitoring
25
Monitoring & ProtectionAS-IS Management & Preventive DiagnosisTO-BE
SCADA
Serial
MV Panel LV Panel Distribution Panel
SCADA Diagnosis. Sys. Operation Sys. Analy. Service
WebMonitoring
MobileMonitoring
Smart MV Panel Smart LV Panel
Ethernet Backbone
26
Customer Value
Maximize power availability, Life Protection
Predictive maintenance & facility condition diagnosis
Minimize Mean Time to Repair (MTTR)
• Real-time temperature monitoring inside the busbar and panel
• Power quality, harmonic monitoring and management• Breaker life diagnosis and prediction• Power event analysis and accident waveform storage• Mobile phone alarm when an event occurs• Minimize the range of arc accident damage
Engineering man-hour reduction
Improved maintenance convenience
Reduce maintenance cost
• Auto Discovery, Auto Time Sync. Function provided• Easy HMI & SW Engineering• Simplified power equipment setting: remote, batch setting,
etc.• Power system local and remote monitoring• Mobile device monitoring through Bluetooth/NFC• Convenient F/W update function
Safety
Convenient
Efficiency
Engineering man-hour reduction
Improved maintenance convenience
Reduce maintenance cost
• End-to-End Energy Monitoring• End-to-End Power Factor & Harmonic Monitoring• Active peak power management through breaker remote
control• Various energy analysis reports• Active energy management through energy demand
forecast• Diagnosis and improvement of energy efficiency of power
equipment
Smart Solution
27
GridSol CARE Operation & Maintenance SW (Smart LV/MV SW)
I-VCB
Sensor(PD, Temp)
X-GIPAM
ArcSensor
GIMAC-B
E-Collector
E-TAG(Energy Module)
MMP EMPR
G100
LV SWGR Distribution BoardM.C.CMV SWGR & TR
RemoteMonitoring
Site Monitoring
SmartDevice
Panel HMI (7” & 3.5”)
Web-server
Smart Viewe
r
MMP-HMI10 (10.2”)
Web-server
Web-server
Smart Viewer
PC manager SW
GIMAC-B MAIN (8”)
Web-server
Panel HMI (7”)
Diagnosis SW
DAU
GIPAM3000Arc relay
GIMAC-V
GIMAC-PQ
Thermal Image
BusbarSensor
IR Temp Sensor
Gateway/Data loggerSmart ACB
Smart MCCBMOP
(MCCB Control)
M-LINK(IO Module)
BusbarSensor
Smart MCCB
DMPi EMPR
GIMAC1000
M100 is7H100인버터
Smart MCCB GIMAC1000
MOP(MCB Control)
SCADA/PAS
28
It is composed of FEMS and integrated management system through connection with renewable energy monitoring (PMS) and
Smart Factory.
경 부하 최고부하
최고부하
평부하
평부하
S/W based on Web Monitoring
Status BoardGatewayMES Product Management
PV Module Battery
Peak Load
LowLoad
BaseLoad
Peak Load
BaseLoad
Factory Load before application
Photovoltaic Power
Factory Load after application
ESS Charge/Discharge Power