Meisseniers, Sint Petersmannen en buitenpoorters in het land van Breda
2nd Public Meeting Simpson Bay - Government of Sint Maarten
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of 2nd Public Meeting Simpson Bay - Government of Sint Maarten
From Starting Points to Development Plan Simpson Bay, September 2012
2nd Public Meeting Simpson Bay
From Starting Points to Development Plan
September 2012
From Starting Points to Development Plan Simpson Bay, September 2012
Welcome by the initiator of this meeting
Dep. Prime Minister
William V. Marlin:
Ministry of Public Housing,
Spatial Planning, Environment
and Infrastructure
On behalf of Mr. William V.
Marlin we welcome you at this
meeting to discuss the outline
of the preliminary draft
development plan of the
Simpson Bay area
From Starting Points to Development Plan Simpson Bay, September 2012
Welcome by the hosts of this meeting
o Louis Brown: Secretary General VROMI
o Cedric Peterson: Moderator
o Hans Sellink: Dept. Head VROM
o Thijs Sommers: Project Leader
o Gerard Willemsen: Process Manager
From Starting Points to Development Plan Simpson Bay, September 2012
Tonight’s meeting
o Purpose of the Development Plan
o How does the Development Plan work
o Back to the first public meeting March 2012
o From Starting Points to the Development Plan
From Starting Points to Development Plan Simpson Bay, September 2012
o Legal framework for possible future development
o To designate and/or reserve land for desired use
o To prevent undisered development
o To offer legal security to residents about future development
It’s not an ‘Action Plan’; it’s a framework plan
And, we will make it in consultation with you
Purpose of the Development Plan
From Starting Points to Development Plan Simpson Bay, September 2012
How does it work
a ter plaatse van de aanduiding ‘luchtvaartverkeerzone - 1’ mag de bouwhoogte niet meer dan 47 m bedragen;
b ter plaatse van de aanduiding ‘luchtvaartverkeerzone - 2’ mag de bouwhoogte niet meer dan 43 m bedragen;
c ter plaatse van de aanduiding ‘luchtvaartverkeerzone - 3’ mag de bouwhoogte niet meer dan 39 m bedragen;
d ter plaatse van de aanduiding ‘luchtvaartverkeerzone - 4’ mag de bouwhoogte niet meer dan 35 m bedragen;
e ter plaatse van de aanduiding ‘luchtvaartverkeerzoen - 5’ mag de bouwhoogte niet meer dan 31 m bedragen;
ter plaatse van de aanduiding ‘luchtvaartverkeerzone - 6’ is bouwen niet toegestaan
The Development Plan contains:
A map: What’s allowed where ?
Regulations: Size ? Height ?
Elucidation: What, Why and How
From Starting Points to Development Plan Simpson Bay, September 2012
How it is made
The plan was drawn up in steps:
Present situation
What’s going on
What problems
Your and our starting points
On tonight’s agenda:
o What solutions
o How to implement in Development
Plan: Reserve space and set rules
From Starting Points to Development Plan Simpson Bay, September 2012 Sentry Hill seen from L van Beethoven Road
The first meeting in March 2012
1st public meeting: March 2012
2nd public meeting: tonight
PPT Available on website
From Starting Points to Development Plan Simpson Bay, September 2012
Some issues and ideas mentioned:
o Tackle the congestion on Airport Road
o Forget the Causeway, it won’t work
o Take care of the Lagoon
o Space for small boats in the Lagoon
o Focus on nature and water quality
o Keep Simpson Bay Village as it is
What did we do with it?
During this presentation we will provide
the answers
The first meeting in March 2012
From Starting Points to Development Plan Simpson Bay, September 2012
o Traffic
o Princess Juliana International Airport
o Tourism and Recreation
o Commercial, Industrial and Public Functions
o Residential neighborhoods
o Nature and Landscape
o Cultural Heritage and Archaeology
Themes
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation
- Congestion on main roads
- No space for pedestrians / cycling / jogging
- Water on the roads / bad pavement and sidewalks
o What’s going on?
- Traffic keeps on growing
- Lejuez Drawbridge needs replacement
Traffic
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for the congestion?
- Make more main roads: reserve space for new roads: links 8 + 9
- Why link 9/‘Causeway’: part of the entire road network
Traffic
From Starting Points to Development Plan Simpson Bay, September 2012
o Solutions for the Airport Road (congestion, lack of walking
space):
- Set rules for reprofiling Airport Road: space for:
- Sidewalk / cycling
- Parking
- Landscaping
- Separation of traffic in transit and service road(s)
- Gutter for run-off water
Traffic
From Starting Points to Development Plan Simpson Bay, September 2012
Traffic
Present situation Airport Road:
From Starting Points to Development Plan Simpson Bay, September 2012
Traffic
Suggestion for the Airport Road:
o Main road for trough traffic
o Space for landscaping
o Parking on parallel road (1 or 2 sides, if space if available)
o Space for sidewalks
From Starting Points to Development Plan Simpson Bay, September 2012
Traffic
Another suggestion for the
Airport Road:
Create extra center lane in the
middle for left turning traffic
only
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for Lejuez bridge?
- Reserve space for improvement of bridge or tunnel
Traffic
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation
- Airport is vital for SXM economy
- Need for space for future growth
- Unsafe: buildings in obstacle-free zone
- Unsafe: too tall buildings + masts in zone with height regulation
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o What’s going on?
- Extension plan for the airport (taxi way)
- Enforcement of international regulations for obstacle-free
zone and zone with height regulation
- Need for airport-related commercial space close to the Airport
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for extension?
- Implement extension area (e.g. for a taxi way)
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for need for Airport-related commercial space?
- Reserve space for (Airport-related) commercial activities
close to the airport
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for (too tall) buildings in obstacle-free zone?
- Short term + for new development: strictly follow the regulations
- Long term (20 – 30 years): Clearance of obstacle-free zone
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for (too tall) buildings in zone with height regulations?
- Short term + for new development: strictly follow the regulations
- Long term (20 – 30 years): reconstruction of relevant areas
Princess Juliana International Airport
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation -
- Appeal of SXM: pristine and accessible beaches
- Appeal of Simpson Bay Lagoon
- The Caribbean Sea: cruises
- Hotels and resorts in attractive locations
- Pleasant atmosphere Simpson Bay Village
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What’s going on?
- Urban development, particularly along the coastal zone
- Growth of Marinas in the Lagoon
- Increasing number of large yachts in the Lagoon
- Poor accessibility of the Lagoon
- No mooring for cruise ships
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for the development pressure along the beach?
- Limit the location, height, width and size of the new buildings
along the beach
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for the vast increase of Marinas?
- Existing Marinas: Maintain present size
- New Marinas: limit in number and size: they can only be
developed within certain designated areas
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for the lack of mooring space for small boats?
- Reserve space for public jetties
- Mooring regulations not regulated in the Development Plan, but
monitored by the Simpson Bay Lagoon Authority
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for the accessibility of the Lagoon?
- Reserve space for a boardwalk next to the Lagoon
- Make footpaths from the Airport Road towards the new
Boardwalk and beach
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for the growing demand for mooring space for mega
yachts / small cruise ships?
- Reserve space for an additional pier, outside the Lagoon
- Set extra rules for height, size and quality of architecture on the
pier?
Tourism and Recreation
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation
- Important commercial areas:
- PJIA, Commercial / Restaurant strip along Airport Road and
Marina’s
- Airport Road important entrance of SXM
- Cluster of public functions in Simpson Bay Village
o What’s going on?
- Limited space for growth along Airport Road
Commercial, Industrial, and Public Functions
PM foto restaurantjes Airport Road, Frank / Urban
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for the limited space for development along the Airport
Road?
- Together with the Boardwalk, create space for (re) development
of the area between Airport Road and the Lagoon
Commercial, Industrial, and Public Functions
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation
- Character of Simpson Bay Village
- But already some larger scale apartment buildings along the
beach
o What’s going on?
- Development pressure might pose a threat to Simpson Bay
Village
- Nuisance from nightlife
Residential neighbourhoods
From Starting Points to Development Plan Simpson Bay, September 2012
o Zoning solutions Simpson Bay and Beacon Hill:
- Maintain housing as the primary function
- Cluster commercial and tourist functions along the Airport Road
and the existing resort in Beacon Hill
Residential neighborhoods
From Starting Points to Development Plan Simpson Bay, September 2012
o How to maintain the character of Simpson Bay Village:
- Set regulations for the architecture of new buildings:
- height,
- width,
- slope of roof,
- alignment
- ….
Residential neighborhoods
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for nuisance of tourist resorts and bars/discos?
- Limit the area of tourist resorts to the present locations
- Limit the opening hours of the discos (not in the Development
plan, but in operational permits)
Residential neighbourhoods
From Starting Points to Development Plan Simpson Bay, September 2012
o Maintain the cluster of public facilities
- Reserve space for public facilities such as schools, cemetery,
playground etc.
Residential neighborhoods
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation -
- Nature value focus in Lagoon, Mullet Pond and on Little Key
- Special features:
- Beach + Caribbean Sea
- Lagoon
Green Hills of SXM in the
background
Nature and Landscape
From Starting Points to Development Plan Simpson Bay, September 2012
o What is going on?
- More Marinas conflict with nature value of the Lagoon shores
- Bad water quality in the Lagoon, especially in the southern point
Nature and Landscape
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions to preserve nature in Mullet Pond and on Little
key?
- Reduce human activities by designating these areas as
‘nature’ and/ or minimal use only
Nature and Landscape
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for the bad water quality of the Lagoon and the
reduction of mangroves?
- Reserve space for sewage treatment plant in the southern
point of the Lagoon
- Stimulate water circulation, e.g. by installing windmills
- Increase mangrove area
Nature and Landscape
Present situation: Suggestion:
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions to maintain the beach?
- Designate the setback line of the beach on the development
plan map
- No buildings or structures allowed
- Recreational and nature function
Nature and Landscape
From Starting Points to Development Plan Simpson Bay, September 2012
o Present situation
- Perceived authentic atmosphere in Simpson Bay Village
because of:
- the many monuments
- drives
o What’s going on?
- Degradation of (some) monuments
- Threat of drives being overbuilt
Cultural Heritage and Archaeology
From Starting Points to Development Plan Simpson Bay, September 2012
o What solutions for maintaining the monuments?
- Protect the monuments via the Monument Ordinance
- Use them, so revenue can be generated to finance the
maintenance
- Possible functions: home, small shop, cafe, depends on
location / situation
Cultural Heritage and Archaeology
From Starting Points to Development Plan Simpson Bay, September 2012
o What solution for maintaining the drives?
- Keep them open by designating them as ‘traffic zone’
Cultural Heritage and Archaeology
From Starting Points to Development Plan Simpson Bay, September 2012 Sentry Hill seen from L van Beethoven Road
What is next?
o Public hearing Preliminary draft
development plan (art 4 EROP):
o Map / ‘Plankaart’
o Regulations / ‘Voorschriften’
o Elucidation / ‘Toelichting’
From Starting Points to Development Plan Simpson Bay, September 2012 Sentry Hill seen from L van Beethoven Road
Thank you for your attention This presentation is also open to discussion via our e-mail: [email protected]