     ANAL ISA HARGA SATUAN S.N.I

    NO. U R A I A N KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga

     A B C D E F G= ( C X E ) H = (C X F ) I = ( G+ H )

    I PEKERJAAN PERSIAPAN

     ANALISA 00 1 1 m' Pag ar Semen tara d ari Ka yu t ing gi 2 m 0.00 38,691.56 38,691.56

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.250 btg -Rp -RpSemen Portland 2.500 Kg -Rp -Rp

    Pasir Beton 0.005 m3 -Rp -Rp

    Koral Beton 0.009 m3 -Rp -Rp

    Kaso 5 / 7 ( albasiah ) 0.072 m3 -Rp -Rp

    Paku Biasa 2" - 5" 0.060 Kg -Rp -Rp

    Residu 0.400 Lt -Rp -Rp

    Tenaga

    Tukang Kayu 0.200 Oh 65,734.00Rp 13,146.80Rp

    Perkerja 0.400 Oh 55,798.00Rp 22,319.20Rp

    Kepala Tukang 0.020 Oh 75,671.00Rp 1,513.42Rp

    Mandor 0.020 Oh 85,607.00Rp 1,712.14Rp

     ANALISA 00 2 1 m' Pag ar Sem entar a dar i Seng Gelom ban g ti ngg i 2 m 0.00 38,691.56 38,691.56

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.250 btg -Rp 0.00

    Semen Portland 2.500 Kg -Rp 0.00

    Pasir Beton 1.200 m3 -Rp 0.00

    Koral Beton 0.009 m3 -Rp 0.00

    Kaso 5 / 7 ( albasiah ) 0.072 m3 -Rp 0.00

    Paku Biasa 2" - 5" 0.060 Kg -Rp 0.00

    Meni Besi 0.450 Lt -Rp 0.00

    Tenaga

    Tukang Kayu 0.200 Oh 65,734.00Rp 13,146.80Rp

    Perkerja 0.400 Oh 55,798.00Rp 22,319.20Rp

    Kepala Tukang 0.020 Oh 75,671.00Rp 1,513.42Rp

    Mandor 0.020 Oh 85,607.00Rp 1,712.14Rp

     ANALISA 00 3 1 m' Pag ar Sem entar a dar i Kawat Duri tin ggi 1.8 m 0.00 33,111.76 33,111.76

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.000 btg -Rp 0.00

    Semen Portland 2.000 Kg -Rp 0.00

    Kawat Duri 25.000 Kg -Rp 0.00

    Pasir Beton 0.005 m3 -Rp 0.00

    Koral Beton 0.009 m3 -Rp 0.00

    Paku Biasa 2" - 5" 0.060 Kg -Rp 0.00

    Tenaga

    Tukang Kayu 0.200 Oh 65,734.00Rp 13,147 

    Perkerja 0.300 Oh 55,798.00Rp 16,739 

    Kepala Tukang 0.020 Oh 75,671.00Rp 1,513 

    Mandor 0.020 Oh 85,607.00Rp 1,712 

     ANALISA 00 4 1 m'  Pek. Pengukur an kembali (site) & Pemasangan Bowplank 0.00 13,337.95 13,337.95

    Bahan

    Kayu Kaso 5 / 7 (borneo) 0.012 m3 -Rp 0.00

    Paku Biasa 2" - 5" 0.020 Kg -Rp 0.00

    Kayu Papan 3 / 20 borneo 0.007 m3 -Rp 0.00

    Tenaga

    Tukang Kayu 0.100 Oh 65,734.00Rp 6,573 

    Perkerja 0.100 Oh 55,798.00Rp 5,580 

    Kepala Tukang 0.010 Oh 75,671.00Rp 757 

    Mandor 0.005 Oh 85,607.00Rp 428 

     ANALISA 00 5 1 m² Pek. Kantor Direksi Keet , dengan lantai plester an 0.00 0.00 0.00

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.250 btg -Rp 0.00

    Kayu Balok Borneo 0.180 m3 -Rp 0.00

    Paku 0.850 Kg -Rp 0.00

    Besi Strip 1.100 Kg -Rp 0.00

    Semen Portland 35.000 Kg -Rp 0.00

    Pasir Pasang 0.150 m3 -Rp 0.00

    Pasir Beton 0.100 m3 -Rp 0.00

    Koral Beton 0.150 m3 -Rp 0.00

    Bata merah kelas I 30.000 bh -Rp 0.00

    Seng Plat 0.250 lbr -Rp 0.00

    Jendela Nako 2.000 bh -Rp 0.00

    Kaca Polos 0.080 m2 -Rp 0.00

    Kunci Tanam 0.150 bh -Rp 0.00

    Plywood 4 mm 0.060 lbr -Rp 0.00

    Tenaga

    Tukang Kayu 2.000 Oh -Rp - 

    Tukang Batu 1.000 Oh -Rp - 

  • 8/17/2019 TUGAS TPIIP1.pdf

    2/62

    Perkerja 2.000 Oh -Rp - 

    Kepala Tukang 0.300 Oh -Rp - 

    Mandor 0.050 Oh -Rp - 

     ANALISA 00 6 1 m²  Pembuatan Gudang Semen dan Alat - alat 0.00 0.00 0.00

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.700 btg -Rp 0.00

    Kayu Balok Borneo 0.210 m3 -Rp 0.00

    Paku 0.300 Kg -Rp 0.00

    Semen Portland 10.500 Kg -Rp 0.00

    Pasir Beton 0.030 m3 -Rp 0.00Koral Beton 0.050 m3 -Rp 0.00

    Seng Gelombang BJLS 32 1.500 lbr -Rp 0.00

    Tenaga

    Tukang Kayu 2.000 Oh -Rp - 

    Perkerja 1.000 Oh -Rp - 

    Kepala Tukang 0.200 Oh -Rp - 

    Mandor 0.050 Oh -Rp - 

     ANALISA 00 7 1 m² Pemb uatan Rumah Jaga / Konstr uksi Kayu 0.00 0.00 0.00

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 3.000 btg -Rp 0.00

    Kayu Balok Borneo 0.276 m3 -Rp 0.00

    Paku 0.700 Kg -Rp 0.00

    Seng Gelombang BJLS 32 1.500 lbr -Rp 0.00

    Tenaga

    Tukang Kayu 1.500 Oh -Rp - 

    Perkerja 1.000 Oh -Rp - 

    Kepala Tukang 0.150 Oh -Rp - 

    Mandor 0.050 Oh -Rp - 

     ANALISA 00 8 Member sih kan L apan gan d an Per ataan 0.00 5,500.00 5,500.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 00 9 1 m²  Pembuatan Bedeng Buruh 547,485.00 116,050.00 663,535.00

    Bahan

    Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 8,800.00 11,000.00

    Kayu Balok Borneo 0.186 m3 1,815,000.00 337,590.00

    Paku 0.300 Kg 34,100.00 10,230.00

    Semen Portland 18.000 Kg 1,100.00 19,800.00

    Pasir Beton 0.030 m3 215,000.00 6,450.00

    Koral Beton 0.050 m3 275,000.00 13,750.00

    Seng Gelombang BJLS 32 1.500 lbr 60,500.00 90,750.00

    Plywood 4 mm 1.350 lbr 42,900.00 57,915.00

    Tenaga

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Perkerja 1.000 Oh 27,500.00 27,500 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 01 0 1 m²  Pembuatan Bak Aduk an ( 40 x 50 x 20 ) cm 2,331,670.00 79,750.00 2,411,420.00

    Bahan

    Kayu Terentang 0.186 m3 1,540,000.00 286,440.00

    Paku 0.300 Kg 34,100.00 10,230.00

    Kayu Kaso 5 / 7 (borneo) 1.000 btg 2,035,000.00 2,035,000.00

    Tenaga

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 01 1 1 m²  Pembuatan Stegger d ari Bambu, ( 40 x 50 x 20 ) cm 17,600.00 116,050.00 133,650.00

    Bahan

    Bambu Ø 6 - 8 / 600 cm 1.000 btg 13,200.00 13,200.00

    Tali Ijuk 0.250 Kg 17,600.00 4,400.00

    Tenaga

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Perkerja 1.000 Oh 27,500.00 27,500 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 01 2 1 m²  Pembuatan Jalan Sementara 55,280.00 30,250.00 85,530.00

    BahanBatu Belah 5 / 20 0.150 m3 209,000.00 31,350.00

    Batu Belah 5 / 7 0.090 m3 242,000.00 21,780.00

    Pasir Pasang 0.010 m3 215,000.00 2,150.00

    Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 01 3 1 m³  Bongkaran Beton Bertulang 0.00 201,657.50 201,657.50

    Tenaga

    Perkerja 6.667 Oh 27,500.00 183,343 

  • 8/17/2019 TUGAS TPIIP1.pdf

    3/62

    Mandor 0.333 Oh 55,000.00 18,315 

     ANALISA 01 4 1 m³  Bongkaran Dinding Tembok Bata Merah 0.00 185,157.50 185,157.50

    Tenaga

    Perkerja 6.667 Oh 27,500.00 183,343 

    Mandor 0.033 Oh 55,000.00 1,815 

    II PEKERJAAN TANAH

     ANALISA 01 5 1 m3 Pek. Ga lian Tanah Biasa Max Ked alaman 1 m' 0.00 13,200.00 13,200.00

    Tenaga

    Perkerja 0.400 Oh 27,500.00 11,000 Tukang Gali Oh 33,000.00 - 

    Kepala Tukang Oh 44,000.00 - 

    Mandor 0.040 Oh 55,000.00 2,200 

     ANALISA 01 6 1 m3 Pek. Ga lian Tanah Biasa Max Ked alaman 2 m' 0.00 17,297.50 17,297.50

    Tenaga

    Perkerja 0.525 Oh 27,500.00 14,438 

    Tukang Gali Oh 33,000.00 - 

    Kepala Tukang Oh 44,000.00 - 

    Mandor 0.052 Oh 55,000.00 2,860 

     ANALISA 01 7 1 m3 Pek. Ga lian Tanah Biasa Max Ked alaman 3 m' 0.00 24,997.50 24,997.50

    Tenaga

    Perkerja 0.735 Oh 27,500.00 20,213 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.073 Oh 55,000.00 4,015 

     ANALISA 01 8 1 m3 Pek. Gal ian T anah Keras Max Ked alama n 1 m' 0.00 22,577.50 22,577.50

    Tenaga

    Perkerja 0.625 Oh 27,500.00 17,188 Tukang Gali 0.020 Oh 33,000.00 660 

    Kepala Tukang 0.030 Oh 44,000.00 1,320 

    Mandor 0.062 Oh 55,000.00 3,410 

     ANALISA 01 9 1 m3 Pek. Gal ian T anah Cadas Max Kedal aman 1 m' 0.00 42,020.00 42,020.00

    Tenaga

    Perkerja 1.250 Oh 27,500.00 34,375 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.125 Oh 55,000.00 6,875 

     ANALISA 02 0 1 m3 Pek. Ga lian Tanah Lum pur Max Ked alaman 1 m' 0.00 27,967.50 27,967.50

    Tenaga

    Perkerja 0.823 Oh 27,500.00 22,633 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.083 Oh 55,000.00 4,565 

     ANALISA 02 1 1 m² Pek. Stripping 1 m 0.00 2,860.00 2,860.00

    Tenaga

    Perkerja 0.050 Oh 27,500.00 1,375 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.005 Oh 55,000.00 275 

     ANALISA 02 2 1 m³ Pemb uangan Tanah sejauh 150 m 0.00 9,416.00 9,416.00

    Tenaga

    Perkerja 0.192 Oh 27,500.00 5,280 

    Tukang Gali 0.002 Oh 33,000.00 66 

    Kepala Tukang 0.030 Oh 44,000.00 1,320 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 02 3 1 m3 Uru gan T anah Kemba li 0.00 16,115.00 16,115.00

    Tenaga

    Perkerja 0.192 Oh 27,500.00 5,280 

    Tukang Gali 0.030 Oh 33,000.00 990 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.019 Oh 55,000.00 1,045 

     ANALISA 02 4 1 m3 Pema datan tana h 0.00 17,402.00 17,402.00

    TenagaPerkerja 0.500 Oh 27,500.00 13,750 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.050 Oh 55,000.00 2,750 

     ANALISA 02 5 1 m3 Pek. Ur uga n Pasi r  105,600.00 9,702.00 115,302.00

    Bahan

    Pasir Urug 1.200 m3 88,000.00 105,600.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

  • 8/17/2019 TUGAS TPIIP1.pdf

    4/62

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 02 6 1 m3 Pema sang an La pis an ij uk 19,800.00 5,852.00 25,652.00

    Bahan

    Ijuk 1.200 m3 16,500.00 19,800.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Gali 0.010 Oh 33,000.00 330 

    Kepala Tukang 0.013 Oh 44,000.00 572 Mandor 0.015 Oh 55,000.00 825 

    III PEKERJAAN PONDASI

     ANALISA 02 7 1 m'  Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulan g 1,231,009.50 44,275.00 1,275,284.50

    Bahan

    Pasir Urug Darat 0.016 m3 35,750.00 572.00

    Pasir Beton 0.080 m3 215,000.00 17,200.00

    Koral Beton 0.125 m3 275,000.00 34,375.00

    Semen Portland 49.000 Kg 1,100.00 53,900.00

    Besi Beton 34.500 Kg 16,000.00 552,000.00

    Kawat Beton 0.700 Kg 21,450.00 15,015.00

    Kayu Kaso 5 / 7 (borneo) 0.270 m3 2,035,000.00 549,450.00

    Paku 0.120 Kg 34,100.00 4,092.00

    Minyak Bekisting 0.090 lt 4,950.00 445.50

    Plamuur Tembok 0.200 Kg 19,800.00 3,960.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Batu 0.500 Oh 35,750.00 17,875 

    Kepala Tukang 0.050 Oh 44,000.00 2,200 

    Mandor 0.040 Oh 55,000.00 2,200 

     ANALISA 02 8 1 m3 Pasa nga n Batu kali 1 Pc : 3Ps 710,460.00 69,465.00 779,925.00

    Bahan

    Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00

    Semen Portland 392.000 Kg 1,100.00 431,200.00

    Pasir Pasang 0.314 m3 215,000.00 67,510.00

    Tenaga

    Perkerja 1.500 Oh 27,500.00 41,250 

    Tukang Batu 0.600 Oh 35,750.00 21,450 

    Kepala Tukang 0.060 Oh 44,000.00 2,640 

    Mandor 0.075 Oh 55,000.00 4,125 

     ANALISA 02 9 1 m3 Pasa nga n Batu kali 1 Pc : 5Ps 478,310.00 69,465.00 547,775.00

    Bahan

    Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00

    Semen Portland 136.000 Kg 1,100.00 149,600.00

    Pasir Pasang 0.544 m3 215,000.00 116,960.00

    Tenaga

    Perkerja 1.500 Oh 27,500.00 41,250 

    Tukang Batu 0.600 Oh 35,750.00 21,450 

    Kepala Tukang 0.060 Oh 44,000.00 2,640 

    Mandor 0.075 Oh 55,000.00 4,125 

    IV PEKERJAAN DINDING

     ANALISA 03 0 1 m2 Pasa nga n Bata Merah 1Pc : 3Ps 1 Bata 140,510.00 27,555.00 168,065.00

    Bahan

    Bata merah kelas I 140.000 bh 605.00 84,700.00

    Semen Portland 32.950 Kg 1,100.00 36,245.00

    Pasir Pasang 0.091 m3 215,000.00 19,565.00

    Tenaga

    Perkerja 0.650 Oh 27,500.00 17,875 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.030 Oh 55,000.00 1,650 

     ANALISA 03 1 1 m2 Pasa nga n Bata Merah 1Pc : 5Ps 1 Bata 131,050.00 27,555.00 158,605.00

    Bahan

    Bata merah kelas I 140.000 bh 605.00 84,700.00

    Semen Portland 22.200 Kg 1,100.00 24,420.00

    Pasir Pasang 0.102 m3 215,000.00 21,930.00

    Tenaga

    Perkerja 0.650 Oh 27,500.00 17,875 Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.030 Oh 55,000.00 1,650 

     ANALISA 03 2 1 m2 Pasa ngan Bata Mer ah 1Pc : 3Ps 1/2 Bata 66,757.00 13,640.00 80,397.00

    Bahan

    Bata merah kelas I 70.000 bh 605.00 42,350.00

    Semen Portland 14.370 Kg 1,100.00 15,807.00

    Pasir Pasang 0.040 m3 215,000.00 8,600.00

    Tenaga

  • 8/17/2019 TUGAS TPIIP1.pdf

    5/62

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.100 Oh 35,750.00 3,575 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 03 3 1 m2 Pasa nga n Bata Merah 1Pc : 5Ps 1/2 Bata 62,673.00 13,640.00 76,313.00

    Bahan

    Bata merah kelas I 70.000 bh 605.00 42,350.00

    Semen Portland 9.680 Kg 1,100.00 10,648.00

    Pasir Pasang 0.045 m3 215,000.00 9,675.00

    TenagaPerkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.100 Oh 35,750.00 3,575 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.015 Oh 55,000.00 825 

    V PEKERJAAN PELESTERAN

     ANALISA 03 2 1 m2 Ples teran Dind ing 1Pc : 3Ps 11,213.00 12,072.50 23,285.50

    Bahan

    Semen Portland 6.480 Kg 1,100.00 7,128.00

    Pasir Pasang 0.019 m3 215,000.00 4,085.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 3 1 m2 Ples teran Dind ing 1Pc : 5Ps 9,482.00 12,072.50 21,554.50

    Bahan

    Semen Portland 4.320 Kg 1,100.00 4,752.00

    Pasir Pasang 0.022 m3 215,000.00 4,730.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 4 1 m2 Ples tera n Dind ing 1Pc : 0. 5K p : 3 Ps , teba l 15 mm 8,075.00 12,072.50 20,147.50

    Bahan

    Semen Portland 4.320 Kg 1,100.00 4,752.00

    Kapur Padam 0.003 m3 176,000.00 528.00

    Pasir Pasang 0.013 m3 215,000.00 2,795.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 5 1 m2 Ples tera n Dind ing 1Pc : 3K p : 10Ps , tebal 15 mm 6,090.00 12,072.50 18,162.50

    Bahan

    Semen Portland 1.840 Kg 1,100.00 2,024.00

    Kapur Padam 0.006 m3 176,000.00 1,056.00

    Pasir Pasang 0.014 m3 215,000.00 3,010.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 6 1 m2 Ples teran 0.5Pc : 1K p : 4Ps , tebal 15 mm 8,265.00 12,072.50 20,337.50

    Bahan

    Semen Portland 3.000 Kg 1,100.00 3,300.00

    Kapur Padam 0.005 m3 176,000.00 880.00

    Pasir Pasang 0.019 m3 215,000.00 4,085.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 7 1 m2 Ples tera n 1Kp : 1 Sm : 1Ps, t ebal 15 mm 3,529.89 12,072.50 15,602.39

    Bahan

    Semen Merah 0.009 Kg 1,210.00 10.89Kapur Padam 0.009 m3 176,000.00 1,584.00

    Pasir Pasang 0.009 m3 215,000.00 1,935.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Batu 0.150 Oh 35,750.00 5,363 

    Kepala Tukang 0.015 Oh 44,000.00 660 

    Mandor 0.010 Oh 55,000.00 550 

     ANALISA 03 8 1 m2 Ples teran 1Kp : 1 Sm : 2Ps, t ebal 15 mm 4,465.47 12,072.50 16,537.97

    Bahan

  • 8/17/2019 TUGAS TPIIP1.pdf

    6/62

  • 8/17/2019 TUGAS TPIIP1.pdf

    7/62

    Pasir Pasang 0.035 m3 215,000.00 7,525.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.013 Oh 55,000.00 715 

     ANALISA 04 7 1 m2 Ple ster an 1Pc : 4Ps , tebal 25 mm 18,598.00 16,995.00 35,593.00

    Bahan

    Semen Portland 9.480 Kg 1,100.00 10,428.00

    Pasir Pasang 0.038 m3 215,000.00 8,170.00Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.013 Oh 55,000.00 715 

     ANALISA 04 8 1 m2 Ples teran 1Pc : 5Ps , tebal 25 mm 17,119.00 16,995.00 34,114.00

    Bahan

    Semen Portland 7.940 Kg 1,100.00 8,734.00

    Pasir Pasang 0.039 m3 215,000.00 8,385.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.013 Oh 55,000.00 715 

     ANALISA 04 9 1 m2 Ples teran 1Pc : 2Ps , tebal 30 mm 28,040.00 19,662.50 47,702.50

    Bahan

    Semen Portland 18.650 Kg 1,100.00 20,515.00

    Pasir Pasang 0.035 m3 215,000.00 7,525.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 05 0 1 m2 Ple ster an 1Pc : 3Ps , tebal 30 mm 23,950.00 19,662.50 43,612.50

    Bahan

    Semen Portland 14.150 Kg 1,100.00 15,565.00

    Pasir Pasang 0.039 m3 215,000.00 8,385.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 05 1 1 m2 Ple ster an 1Pc : 4Ps , tebal 30 mm 21,548.00 19,662.50 41,210.50

    Bahan

    Semen Portland 11.380 Kg 1,100.00 12,518.00

    Pasir Pasang 0.042 m3 215,000.00 9,030.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 05 2 1 m2 Ples teran 1Pc : 5Ps , tebal 30 mm 18,684.00 19,662.50 38,346.50

    Bahan

    Semen Portland 8.190 Kg 1,100.00 9,009.00

    Pasir Pasang 0.045 m3 215,000.00 9,675.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 05 3 1 m2 Berapen 1Pc : 3Ps, tebal 30 mm 12,292.00 7,375.50 19,667.50

    Bahan

    Semen Portland 7.070 Kg 1,100.00 7,777.00

    Pasir Pasang 0.021 m3 215,000.00 4,515.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 Tukang Batu 0.070 Oh 35,750.00 2,503 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.008 Oh 55,000.00 440 

     ANALISA 05 4 1 m2 Ber apen 1Pc : 5Ps , tebal 15 mm 11,182.00 7,375.50 18,557.50

    Bahan

    Semen Portland 5.670 Kg 1,100.00 6,237.00

    Pasir Pasang 0.023 m3 215,000.00 4,945.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

  • 8/17/2019 TUGAS TPIIP1.pdf

    8/62

    Tukang Batu 0.070 Oh 35,750.00 2,503 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.008 Oh 55,000.00 440 

     ANALISA 05 5 1 m2 Pel ester an Bet on 1P c : 2Ps, t ebal 15 mm 14,100.00 15,895.00 29,995.00

    Bahan

    Semen Portland 9.300 Kg 1,100.00 10,230.00

    Pasir Pasang 0.018 m3 215,000.00 3,870.00

    Tenaga

    Perkerja 0.260 Oh 27,500.00 7,150 

    Tukang Batu 0.200 Oh 35,750.00 7,150 Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.013 Oh 55,000.00 715 

     ANALISA 05 6 1 m2 Pele ster an Bet on 1P c : 3Ps, t ebal 15 mm 12,292.00 15,895.00 28,187.00

    Bahan

    Semen Portland 7.070 Kg 1,100.00 7,777.00

    Pasir Pasang 0.021 m3 215,000.00 4,515.00

    Tenaga

    Perkerja 0.260 Oh 27,500.00 7,150 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.013 Oh 55,000.00 715 

     ANALISA 05 7 1 m2 Pele ster an Sko rin g 1Pc : 2Ps 980.00 4,708.00 5,688.00

    Bahan

    Semen Portland 0.500 Kg 1,100.00 550.00

    Pasir Pasang 0.002 m3 215,000.00 430.00

    Tenaga

    Perkerja 0.057 Oh 27,500.00 1,568 

    Tukang Batu 0.038 Oh 35,750.00 1,359 

    Kepala Tukang 0.038 Oh 44,000.00 1,672 Mandor 0.002 Oh 55,000.00 110 

     ANALISA 05 8 1 m2 Pel ester an Gra nito 1Pc Warn a : 2 Gran ito , tebal 10 mm 330,190.08 2,453.00 332,643.08

    Bahan

    PC Warna 0.144 Kg 1,320.00 190.08

    Batu Granito 15.000 Kg 22,000.00 330,000.00

    Tenaga

    Perkerja 0.050 Oh 27,500.00 1,375 

    Tukang Batu 0.020 Oh 35,750.00 715 

    Kepala Tukang 0.002 Oh 44,000.00 88 

    Mandor 0.005 Oh 55,000.00 275 

     ANALISA 05 9 1 m2 Pel ester an Ter aso 1P c Warn a : 2 Bat u Ter aso, t ebal 1 0 mm 202,980.80 21,780.00 224,760.80

    Bahan

    PC Warna 0.440 Kg 1,320.00 580.80

    Batu Teraso 11.500 Kg 17,600.00 202,400.00

    Tenaga

    Perkerja 0.450 Oh 27,500.00 12,375 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.025 Oh 55,000.00 1,375 

     ANALISA 06 0 1 m2 Pele ster an Cip rat 1 Pc : 2 Ps 8,192.00 11,715.00 19,907.00

    Bahan

    Semen Portland 4.320 Kg 1,100.00 4,752.00

    Pasir Pasang 0.016 m3 215,000.00 3,440.00

    Tenaga

    Perkerja 0.250 Oh 27,500.00 6,875 

    Tukang Batu 0.100 Oh 35,750.00 3,575 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 06 1 1 m2 Pele ster an Sia r Ad ukan 1 Pc : 2 Ps 8,192.00 7,375.50 15,567.50

    Bahan

    Semen Portland 4.320 Kg 1,100.00 4,752.00

    Pasir Pasang 0.016 m3 215,000.00 3,440.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Batu 0.070 Oh 35,750.00 2,503 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.008 Oh 55,000.00 440 

     ANALISA 06 2 1 m2 Pel ester an Water fro of Bat acot e 3 lap is 59,260.00 17,105.00 76,365.00

    Bahan

    Semen Portland 0.500 Kg 1,100.00 550.00

    Batacote 2.900 Kg 19,800.00 57,420.00

    Pasir Pasang 0.006 m3 215,000.00 1,290.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Batu 0.200 Oh 35,750.00 7,150 

    Kepala Tukang 0.020 Oh 44,000.00 880 

  • 8/17/2019 TUGAS TPIIP1.pdf

    9/62

    Mandor 0.015 Oh 55,000.00 825 

     ANALISA 06 3 1 m2 Ple ster an Din din g 1 : 3 + A CIAN 14,390.00 12,519.38 26,909.38

    Bahan

    Semen Portland 8.0000 kg 1,100.00 8,800.00

    Pasir Pasang 0.0260 m3 215,000.00 5,590.00

    Tenaga

    Perkerja 0.2250 org 27,500.00 6,188  0.00

    Tukang Batu 0.1525 org 35,750.00 5,452  0.00

    Kepala Tukang 0.0100 org 44,000.00 440  0.00

    Mandor 0.0080 org 55,000.00 440  0.00

    1 m2 Plesteran Dinding 1 : 5 + ACIAN 11,960.00 12,519.38 24,479.38

    Bahan

    Semen Portland 5.4000 kg 1,100.00 5,940.00

    Pasir Pasang 0.0280 m3 215,000.00 6,020.00

    Tenaga

    Perkerja 0.2250 org 27,500.00 6,188  0.00

    Tukang Batu 0.1525 org 35,750.00 5,452  0.00

    Kepala Tukang 0.0100 org 44,000.00 440  0.00

    Mandor 0.0080 org 55,000.00 440  0.00

    III PEKERJAAN KAYU

    1m³ Pasang Kusen Pintu dan Jendela Kayu Jati 3 0,25 0,00 0.0 0 1 ,0 39 ,50 0.00 3 1,2 89 ,5 00.0 0

    Bahan

    Kayu Balok Jati 1.100 m3 27,500,000.00 30,250,000.00

    Tenaga

    Perkerja 6.000 Oh 27,500.00 165,000 

    Tukang Kayu 20.000 Oh 38,500.00 770,000 

    Kepala Tukang 2.000 Oh 44,000.00 88,000 

    Mandor 0.300 Oh 55,000.00 16,500 

    1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 2,178,000.00 962,500.00 3,140,500.00

    Bahan

    Kayu Balok Borneo 1.200 m3 1,815,000.00 2,178,000.00

    Tenaga

    Perkerja 6.000 Oh 27,500.00 165,000 

    Tukang Kayu 18.000 Oh 38,500.00 693,000 

    Kepala Tukang 2.000 Oh 44,000.00 88,000 

    Mandor 0.300 Oh 55,000.00 16,500 

    1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,442,000.00 962,500.00 3,404,500.00

    Bahan

    Kayu Balok Damar Laut 1.200 m3 2,035,000.00 2,442,000.00

    Tenaga

    Perkerja 6.000 Oh 27,500.00 165,000 

    Tukang Kayu 18.000 Oh 38,500.00 693,000 

    Kepala Tukang 2.000 Oh 44,000.00 88,000 

    Mandor 0.300 Oh 55,000.00 16,500 

    1m² Pasang Pintu Klamp Kayu Kamper  74,965.00 55,660.00 130,625.00

    Bahan

    Papan Kayu Kamper 0.036 m3 2,035,000.00 73,260.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.350 Oh 27,500.00 9,625 

    Tukang Kayu 1.050 Oh 38,500.00 40,425 

    Kepala Tukang 0.105 Oh 44,000.00 4,620 

    Mandor 0.018 Oh 55,000.00 990 

    1m² Pasang Pintu Klamp Kayu Borneo 74,965.00 55,660.00 130,625.00

    Bahan

    Papan Kayu Borneo 0.036 m3 2,035,000.00 73,260.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.350 Oh 27,500.00 9,625 

    Tukang Kayu 1.050 Oh 38,500.00 40,425 

    Kepala Tukang 0.105 Oh 44,000.00 4,620 

    Mandor 0.018 Oh 55,000.00 990 

    1m² Pasang Pintu Panel Kayu Jati 1,375,000.00 137,500.00 1,512,500.00

    Bahan

    Papan Kayu Jati 0.050 m3 27,500,000.00 1,375,000.00Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m² Pasang Pintu Panel Kayu Kamper  81,400.00 137,500.00 218,900.00

    Bahan

    Papan Kayu Kamper 0.040 m3 2,035,000.00 81,400.00

    Tenaga

  • 8/17/2019 TUGAS TPIIP1.pdf

    10/62

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m² Pasang Pintu dan Jendela Kaca Kayu Jati 962,500.00 110,000.00 1,072,500.00

    Bahan

    Papan Kayu Jati 0.035 m3 27,500,000.00 962,500.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu dan Jendela Kaca Kayu Kamper  71,225.00 110,000.00 181,225.00

    Bahan

    Papan Kayu Kamper 0.035 m3 2,035,000.00 71,225.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 71,225.00 110,000.00 181,225.00

    Bahan

    Papan Kayu Borneo 0.035 m3 2,035,000.00 71,225.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 130,240.00 172,700.00 302,940.00

    Bahan

    Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00

    Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 3.000 Oh 38,500.00 115,500 

    Kepala Tukang 0.300 Oh 44,000.00 13,200 

    Mandor 0.300 Oh 55,000.00 16,500 

    1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper  130,240.00 183,700.00 313,940.00

    Bahan

    Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00

    Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 3.000 Oh 38,500.00 115,500 

    Kepala Tukang 0.300 Oh 44,000.00 13,200 

    Mandor 0.500 Oh 55,000.00 27,500 

    1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 585,893.00 103,950.00 689,843.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00

    LemKayu 0.300 Lt 9,900.00 2,970.00

    Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper  585,893.00 103,950.00 689,843.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00

    LemKayu 0.300 Lt 9,900.00 2,970.00

    Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Jalusi Mati Kusen Kayu Jati 1,655,115.00 100,925.00 1,756,040.00

    Bahan

    Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00

    Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.500 Oh 27,500.00 13,750 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.025 Oh 55,000.00 1,375 

  • 8/17/2019 TUGAS TPIIP1.pdf

    11/62

    1m² Pasang Jalusi Mati Kusen Kayu Kamper  1,655,115.00 100,925.00 1,756,040.00

    Bahan

    Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00

    Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.500 Oh 27,500.00 13,750 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.025 Oh 55,000.00 1,375 

    1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 86,779.00 103,950.00 190,729.00

    Bahan

    Papan Kayu Borneo 0.0196 m3 2,035,000.00 39,886.00

    Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00

    LemKayu 0.300 Lt 9,900.00 2,970.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 595,100.00 103,950.00 699,050.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.300 Lt 9,900.00 2,970.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper  595,100.00 103,950.00 699,050.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.300 Lt 9,900.00 2,970.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 2.000 Oh 38,500.00 77,000 

    Kepala Tukang 0.200 Oh 44,000.00 8,800 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.800 Lt 9,900.00 7,920.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper  133,936.00 131,450.00 265,386.00

    Bahan

    Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.800 Lt 9,900.00 7,920.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.800 Lt 9,900.00 7,920.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00

    Tenaga

    Perkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

  • 8/17/2019 TUGAS TPIIP1.pdf

    12/62

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis ) 611,600.00 131,450.00 743,050.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 0.800 Lt 9,900.00 7,920.00

    Plywood 4 mm 0.500 lbr 42,900.00 21,450.00

    Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00

    TenagaPerkerja 0.800 Oh 27,500.00 22,000 

    Tukang Kayu 2.500 Oh 38,500.00 96,250 

    Kepala Tukang 0.250 Oh 44,000.00 11,000 

    Mandor 0.040 Oh 55,000.00 2,200 

    1m² Pasang Pintu Formika Double, rangka Kayu Jati 670,010.00 141,790.00 811,800.00

    Bahan

    Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

    Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 1.200 Lt 9,900.00 11,880.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00

    Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 2.600 Oh 38,500.00 100,100 

    Kepala Tukang 0.260 Oh 44,000.00 11,440 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m² Pasang Pintu Formika Double, rangka Kayu Kamper  170,896.00 141,790.00 312,686.00

    Bahan

    Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00

    LemKayu 1.200 Lt 9,900.00 11,880.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00

    Tenaga

    Perkerja 1.000 Oh 27,500.00 27,500 

    Tukang Kayu 2.600 Oh 38,500.00 100,100 

    Kepala Tukang 0.260 Oh 44,000.00 11,440 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m3 Pasang Konstruksi Kuda - kuda Kayu Jati 30,450,530.00 635,800.00 31,086,330.00

    Bahan

    Balok Kayu Jati 1.100 m3 27,500,000.00 30,250,000.00

    Besi Strip 15.000 11,550.00 173,250.00

    Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

    Tenaga

    Perkerja 4.000 Oh 27,500.00 110,000 

    Tukang Kayu 12.000 Oh 38,500.00 462,000 

    Kepala Tukang 1.200 Oh 44,000.00 52,800 

    Mandor 0.200 Oh 55,000.00 11,000 

    1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper  2,015,530.00 635,800.00 2,651,330.00

    Bahan

    Balok Kayu Kamper 1.100 m3 1,650,000.00 1,815,000.00

    Besi Strip 15.000 Kg 11,550.00 173,250.00

    Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

    Tenaga

    Perkerja 4.000 Oh 27,500.00 110,000 

    Tukang Kayu 12.000 Oh 38,500.00 462,000 

    Kepala Tukang 1.200 Oh 44,000.00 52,800 

    Mandor 0.200 Oh 55,000.00 11,000 

    1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo 1,960,530.00 635,800.00 2,596,330.00

    Bahan

    Balok Kayu Borneo 1.100 m3 1,600,000.00 1,760,000.00

    Besi Strip 15.000 Kg 11,550.00 173,250.00

    Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

    Tenaga

    Perkerja 4.000 Oh 27,500.00 110,000 

    Tukang Kayu 12.000 Oh 38,500.00 462,000 

    Kepala Tukang 1.200 Oh 44,000.00 52,800 Mandor 0.200 Oh 55,000.00 11,000 

    1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 1,834,030.00 635,800.00 2,469,830.00

    Bahan

    Balok Kayu Kruing 1.100 m3 1,485,000.00 1,633,500.00

    Besi Strip 15.000 Kg 11,550.00 173,250.00

    Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

    Tenaga

    Perkerja 4.000 Oh 27,500.00 110,000 

    Tukang Kayu 12.000 Oh 38,500.00 462,000 

  • 8/17/2019 TUGAS TPIIP1.pdf

    13/62

    Kepala Tukang 1.200 Oh 44,000.00 52,800 

    Mandor 0.200 Oh 55,000.00 11,000 

    1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper  24,915.00 7,315.00 32,230.00

    Bahan

    Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 24,315.00 7,315.00 31,630.00

    Bahan

    Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 390,115.00 7,315.00 397,430.00

    Bahan

    Balok Kayu Jati 0.014 m3 27,500,000.00 385,000.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper  28,215.00 7,315.00 35,530.00

    Bahan

    Balok Kayu Kamper 0.014 m3 1,650,000.00 23,100.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 27,515.00 7,315.00 34,830.00

    Bahan

    Balok Kayu Borneo 0.014 m3 1,600,000.00 22,400.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper  279,070.00 8,778.00 287,848.00

    Bahan

    Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.120 Oh 27,500.00 3,300 

    Tukang Kayu 0.120 Oh 38,500.00 4,620 

    Kepala Tukang 0.012 Oh 44,000.00 528 

    Mandor 0.006 Oh 55,000.00 330 

    1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 279,070.00 8,778.00 287,848.00

    Bahan

    Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.120 Oh 27,500.00 3,300 

    Tukang Kayu 0.120 Oh 38,500.00 4,620 

    Kepala Tukang 0.012 Oh 44,000.00 528 

    Mandor 0.006 Oh 55,000.00 330 

    1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 333,410.00 18,975.00 352,385.00

    Bahan

    Balok Kayu Jati 0.012 m3 27,500,000.00 330,000.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.075 Oh 55,000.00 4,125 

  • 8/17/2019 TUGAS TPIIP1.pdf

    14/62

    1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 16,357.00 11,825.00 28,182.00

    Bahan

    Kayu Papan 3 / 20 borneo 0.0072 m3 2,035,000.00 14,652.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.005 Oh 55,000.00 275 

    1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 23,210.00 18,975.00 42,185.00

    Bahan

    Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 23,210.00 18,975.00 42,185.00

    Bahan

    Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 637,615.00 18,920.00 656,535.00

    Bahan

    Balok Kayu Jati 0.023 m3 27,500,000.00 632,500.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.300 Oh 38,500.00 11,550 

    Kepala Tukang 0.030 Oh 44,000.00 1,320 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper  43,065.00 18,920.00 61,985.00

    Bahan

    Balok Kayu Kamper 0.023 m3 1,650,000.00 37,950.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.300 Oh 38,500.00 11,550 

    Kepala Tukang 0.030 Oh 44,000.00 1,320 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 41,915.00 18,920.00 60,835.00

    Bahan

    Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00

    Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.300 Oh 38,500.00 11,550 

    Kepala Tukang 0.030 Oh 44,000.00 1,320 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 749,320.00 22,577.50 771,897.50

    Bahan

    Balok Kayu Jati 0.027 m3 27,500,000.00 742,500.00

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.250 Oh 27,500.00 6,875 

    Tukang Kayu 0.350 Oh 38,500.00 13,475 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 0.0125 Oh 55,000.00 688 

    1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper  51,370.00 22,577.50 73,947.50

    Bahan

    Balok Kayu Kamper 0.027 m3 1,650,000.00 44,550.00Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.250 Oh 27,500.00 6,875 

    Tukang Kayu 0.350 Oh 38,500.00 13,475 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 0.0125 Oh 55,000.00 688 

    1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 50,020.00 22,577.50 72,597.50

    Bahan

    Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00

  • 8/17/2019 TUGAS TPIIP1.pdf

    15/62

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.250 Oh 27,500.00 6,875 

    Tukang Kayu 0.350 Oh 38,500.00 13,475 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 0.0125 Oh 55,000.00 688 

    1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati 199,705.00 11,825.00 211,530.00

    Bahan

    Papan Kayu Jati 0.0072 m3 27,500,000.00 198,000.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.005 Oh 55,000.00 275 

    1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper 16,357.00 11,825.00 28,182.00

    Bahan

    Papan Kayu Kamper 0.0072 m3 2,035,000.00 14,652.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.005 Oh 55,000.00 275 

    1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati 304,205.00 12,738.00 316,943.00

    Bahan

    Papan Kayu Jati 0.0110 m3 27,500,000.00 302,500.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.110 Oh 27,500.00 3,025 

    Tukang Kayu 0.220 Oh 38,500.00 8,470 

    Kepala Tukang 0.022 Oh 44,000.00 968 

    Mandor 0.005 Oh 55,000.00 275 

    1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper 24,090.00 12,738.00 36,828.00

    Bahan

    Papan Kayu Kamper 0.0110 m3 2,035,000.00 22,385.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.110 Oh 27,500.00 3,025 

    Tukang Kayu 0.220 Oh 38,500.00 8,470 

    Kepala Tukang 0.022 Oh 44,000.00 968 

    Mandor 0.005 Oh 55,000.00 275 

    1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper 31,553.50 18,975.00 50,528.50

    Bahan

    Papan Kayu Kamper 0.0145 m3 2,035,000.00 29,507.50

    Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper 19,547.00 9,790.00 29,337.00

    Bahan

    Papan Kayu Kamper 0.0086 m3 2,035,000.00 17,501.00

    Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo 19,954.00 9,790.00 29,744.00

    Bahan

    Papan Kayu Borneo 0.0088 m3 2,035,000.00 17,908.00

    Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.050 Oh 55,000.00 2,750 

    1m² Pasang Rangka Dinding Pemisah Kayu Kamper  49,830.00 27,555.00 77,385.00

    Bahan

    Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00

    Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Tenaga

  • 8/17/2019 TUGAS TPIIP1.pdf

    16/62

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.450 Oh 38,500.00 17,325 

    Kepala Tukang 0.045 Oh 44,000.00 1,980 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Rangka Dinding Pemisah Kayu Borneo 48,855.00 27,555.00 76,410.00

    Bahan

    Balok Kayu Borneo 0.0195 m3 1,600,000.00 31,200.00

    Papan Kayu Borneo 0.007 m3 2,035,000.00 14,245.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    TenagaPerkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.450 Oh 38,500.00 17,325 

    Kepala Tukang 0.045 Oh 44,000.00 1,980 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper  49,830.00 27,555.00 77,385.00

    Bahan

    Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00

    Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.450 Oh 38,500.00 17,325 

    Kepala Tukang 0.045 Oh 44,000.00 1,980 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper  49,830.00 27,555.00 77,385.00

    Bahan

    Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00

    Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.450 Oh 38,500.00 17,325 

    Kepala Tukang 0.045 Oh 44,000.00 1,980 

    Mandor 0.075 Oh 55,000.00 4,125 

    1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper  98,274.00 31,790.00 130,064.00

    Bahan

    Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00

    Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    LemKayu 0.560 lt 9,900.00 5,544.00

    Plywood 4 mm 1.000 lbr 42,900.00 42,900.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.600 Oh 38,500.00 23,100 

    Kepala Tukang 0.060 Oh 44,000.00 2,640 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Dinding Lambriziring dari papan Kayu jati 201,025.00 95,370.00 296,395.00

    Bahan

    Papan Kayu Jati 0.007 m3 27,500,000.00 192,500.00

    Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

    Paku Skrup 3.5" 0.150 Kg 34,100.00 5,115.00

    Tenaga

    Perkerja 0.600 Oh 27,500.00 16,500 

    Tukang Kayu 1.800 Oh 38,500.00 69,300 

    Kepala Tukang 0.180 Oh 44,000.00 7,920 

    Mandor 0.030 Oh 55,000.00 1,650 

    1m² Pasang Plywood tebal 4mm, untuk dinding 18,865.00 3,976.50 22,841.50

    Bahan

    Plywood 4 mm 0.400 lbr 42,900.00 17,160.00

    Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.025 Oh 27,500.00 688 

    Tukang Kayu 0.075 Oh 38,500.00 2,888 

    Kepala Tukang 0.0075 Oh 44,000.00 330 

    Mandor 0.0013 Oh 55,000.00 72 

    1m² Pasang List Plafond Kayu Profil 18,480.00 1,529.00 20,009.00Bahan

    Kayu Profil 1.050 m' 17,600.00 18,480.00

    Tenaga

    Perkerja 0.021 Oh 27,500.00 578 

    Tukang Kayu 0.021 Oh 38,500.00 809 

    Kepala Tukang 0.0020 Oh 44,000.00 88 

    Mandor 0.0010 Oh 55,000.00 55 

    PEKERJAAN BETON

    1 m2 Membuat Lantai Kerja Beton Tu mbuk 1 Pc : 3 Ps : 5 Kr  28,690.00 32,758.00 61,448.00

  • 8/17/2019 TUGAS TPIIP1.pdf

    17/62

    Bahan

    Semen Portland 10.000 Kg 1,100.00 11,000.00

    Pasir Beton 0.026 m3 215,000.00 5,590.00

    Koral Beton 0.044 m3 275,000.00 12,100.00

    Tenaga

    Perkerja 1.150 Oh 27,500.00 31,625 

    Tukang Batu 0.020 Oh 35,750.00 715 

    Kepala Tukang 0.002 Oh 44,000.00 88 

    Mandor 0.006 Oh 55,000.00 330 

    1 m³ Membuat Beton Tumbu k 1 Pc : 3 Ps : 5 Kr 590,850.00 59,812.50 650,662.50

    Bahan

    Semen Portland 218.000 Kg 1,100.00 239,800.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.870 m3 275,000.00 239,250.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Tumbu k 1 Pc : 3 Ps : 6 Kr  576,250.00 59,812.50 636,062.50

    Bahan

    Semen Portland 197.000 Kg 1,100.00 216,700.00

    Pasir Beton 0.470 m3 215,000.00 101,050.00

    Koral Beton 0.940 m3 275,000.00 258,500.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Tumbu k 1 Pc : 4 Ps : 6 Kr  552,100.00 59,812.50 611,912.50

    Bahan

    Semen Portland 173.000 Kg 1,100.00 190,300.00

    Pasir Beton 0.570 m3 215,000.00 122,550.00

    Koral Beton 0.870 m3 275,000.00 239,250.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr  581,500.00 59,812.50 641,312.50

    Bahan

    Semen Portland 232.000 Kg 1,100.00 255,200.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertul ang 1 Pc : 2 Ps : 4 Kr  652,250.00 59,812.50 712,062.50

    Bahan

    Semen Portland 280.000 Kg 1,100.00 308,000.00

    Pasir Beton 0.450 m3 215,000.00 96,750.00

    Koral Beton 0.900 m3 275,000.00 247,500.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertul ang 1 Pc : 2 Ps : 2.5 Kr  700,100.00 59,812.50 759,912.50

    Bahan

    Semen Portland 352.000 Kg 1,100.00 387,200.00

    Pasir Beton 0.560 m3 215,000.00 120,400.00

    Koral Beton 0.700 m3 275,000.00 192,500.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertul ang 1 Pc : 1.5 Ps : 3Kr  631,500.00 59,812.50 691,312.50

    Bahan

    Semen Portland 357.000 Kg 1,100.00 392,700.00

    Pasir Beton 0.420 m3 215,000.00 90,300.00

    Koral Beton 0.540 m3 275,000.00 148,500.00

    Tenaga

  • 8/17/2019 TUGAS TPIIP1.pdf

    18/62

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertul ang 1 Pc : 1.5 Ps : 2.5Kr  740,150.00 59,812.50 799,962.50

    Bahan

    Semen Portland 386.000 Kg 1,100.00 424,600.00

    Pasir Beton 0.470 m3 215,000.00 101,050.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    TenagaPerkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertul ang 1 Pc : 1 Ps : 2Kr  809,950.00 59,812.50 869,762.50

    Bahan

    Semen Portland 479.000 Kg 1,100.00 526,900.00

    Pasir Beton 0.370 m3 215,000.00 79,550.00

    Koral Beton 0.740 m3 275,000.00 203,500.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Tiang Pancang Prestressed Beton 828,892.00 59,812.50 888,704.50

    Bahan

    Semen Portland 479.000 Kg 1,100.00 526,900.00

    Pasir Beton 0.370 m3 215,000.00 79,550.00

    Koral Beton 0.740 m3 275,000.00 203,500.00Rapidrant 2.460 gln 7,700.00 18,942.00

    Tenaga

    Perkerja 1.650 Oh 27,500.00 45,375 

    Tukang Batu 0.250 Oh 35,750.00 8,938 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.080 Oh 55,000.00 4,400 

    1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 708,450.00 124,052.50 832,502.50

    Bahan

    Semen Portland 336.000 Kg 1,100.00 369,600.00

    Pasir Beton 0.540 m3 215,000.00 116,100.00

    Koral Beton 0.810 m3 275,000.00 222,750.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

    1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt 676,900.00 124,052.50 800,952.50

    Bahan

    Semen Portland 291.000 Kg 1,100.00 320,100.00

    Pasir Beton 0.470 m3 215,000.00 101,050.00

    Koral Beton 0.930 m3 275,000.00 255,750.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

    1 m³ Membuat Beton Bertul ang 1 Pc : 1.5Ps : 3 Splt 740,300.00 124,052.50 864,352.50

    Bahan

    Semen Portland 367.000 Kg 1,100.00 403,700.00

    Pasir Beton 0.440 m3 215,000.00 94,600.00

    Koral Beton 0.880 m3 275,000.00 242,000.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

    1 m³ Membuat Beton Bertul ang 1 Pc : 1.5Ps : 2.5 Splt 763,200.00 124,052.50 887,252.50Bahan

    Semen Portland 400.000 Kg 1,100.00 440,000.00

    Pasir Beton 0.480 m3 215,000.00 103,200.00

    Koral Beton 0.800 m3 275,000.00 220,000.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

  • 8/17/2019 TUGAS TPIIP1.pdf

    19/62

    1 m³ Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt 931,300.00 124,052.50 1,055,352.50

    Bahan

    Semen Portland 615.000 Kg 1,100.00 676,500.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.520 m3 275,000.00 143,000.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

    1 m³ Membuat Beton Kedap Air dengan Strorox - 100 769,140.00 124,052.50 893,192.50

    Bahan

    Semen Portland 400.000 Kg 1,100.00 440,000.00

    Pasir Beton 0.480 m3 215,000.00 103,200.00

    Koral Beton 0.800 m3 275,000.00 220,000.00

    Strorox - 100 1.200 Kg 4,950.00 5,940.00

    Tenaga

    Perkerja 2.000 Oh 27,500.00 55,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Kepala Tukang 0.035 Oh 44,000.00 1,540 

    Mandor 1.000 Oh 55,000.00 55,000 

    1 m' Memasang PVC Waterstop lebar 150 mm 36,960.00 2,689.50 39,649.50

    Bahan

    Waterstop lebar 150 mm 1.050 m' 35,200.00 36,960.00

    Tenaga

    Perkerja 0.050 Oh 27,500.00 1,375 

    Tukang Batu 0.030 Oh 35,750.00 1,073 

    Kepala Tukang 0.003 Oh 44,000.00 132 

    Mandor 0.002 Oh 55,000.00 110 

    1 m' Memasang PVC Waterstop lebar 200 mm 40,425.00 2,711.50 43,136.50

    Bahan

    Waterstop lebar 200 mm 1.050 m' 38,500.00 40,425.00

    Tenaga

    Perkerja 0.050 Oh 27,500.00 1,375 

    Tukang Batu 0.030 Oh 35,750.00 1,073 

    Kepala Tukang 0.0035 Oh 44,000.00 154 

    Mandor 0.002 Oh 55,000.00 110 

    1 m' Memasang PVC Waterstop lebar 230 mm 42,735.00 27,802.50 70,537.50

    Bahan

    Waterstop lebar 230 mm 1.050 m' 40,700.00 42,735.00

    Tenaga

    Perkerja 0.550 Oh 27,500.00 15,125 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Mandor 0.003 Oh 55,000.00 165 

    1 m' Memasang PVC Waterstop lebar 250 mm 47,355.00 27,802.50 75,157.50

    Bahan

    Waterstop lebar 250 mm 1.050 m' 45,100.00 47,355.00

    Tenaga

    Perkerja 0.550 Oh 27,500.00 15,125 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Mandor 0.003 Oh 55,000.00 165 

    1 m' Memasang PVC Waterstop lebar 300 mm 53,130.00 27,802.50 80,932.50

    Bahan

    Waterstop lebar 300 mm 1.050 m' 50,600.00 53,130.00

    Tenaga

    Perkerja 0.550 Oh 27,500.00 15,125 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Mandor 0.003 Oh 55,000.00 165 

    1 m' Memasang PVC Waterstop lebar 320 mm 75,075.00 27,802.50 102,877.50

    Bahan

    Waterstop lebar 320 mm 1.050 m' 71,500.00 75,075.00

    Tenaga

    Perkerja 0.550 Oh 27,500.00 15,125 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Mandor 0.003 Oh 55,000.00 165 

    1 Kg Pembesian dengan Besi Polos atau Besi Ulir 17,646.75 490.05 18,136.80

    Bahan

    Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00

    Kawat Beton 0.015 Kg 21,450.00 321.75

    Tenaga

    Perkerja 0.007 Oh 27,500.00 193 

    Tukang Besi 0.007 Oh 35,750.00 250 

    Kepala Tukang 0.0007 Oh 44,000.00 31 

    Mandor 0.0003 Oh 55,000.00 17 

  • 8/17/2019 TUGAS TPIIP1.pdf

    20/62

    1 Kg Kabel Presstressed Polos / Strands 17,539.50 354.75 17,894.25

    Bahan

    Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00

    Kawat Beton 0.010 Kg 21,450.00 214.50

    Tenaga

    Perkerja 0.005 Oh 27,500.00 138 

    Tukang Besi 0.005 Oh 35,750.00 179 

    Kepala Tukang 0.0005 Oh 44,000.00 22 

    Mandor 0.0003 Oh 55,000.00 17 

    1 Kg Jaring Kawat Baja 39,707.25 1,773.75 41,481.00Bahan

    Besi Jaring Kawat Baja 1.020 Kg 22,000.00 22,440.00

    Kawat Beton 0.805 Kg 21,450.00 17,267.25

    Tenaga

    Perkerja 0.025 Oh 27,500.00 688 

    Tukang Besi 0.025 Oh 35,750.00 894 

    Kepala Tukang 0.0025 Oh 44,000.00 110 

    Mandor 0.0015 Oh 55,000.00 83 

    1 m2 Pasang Bekisting 108,955.00 22,737.00 131,692.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

    Minyak Bekisting 0.200 Lt 4,950.00 990.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Kayu 0.330 Oh 38,500.00 12,705 

    Kepala Tukang 0.0330 Oh 44,000.00 1,452 

    Mandor 0.0060 Oh 55,000.00 330 

    1 m2 Pasan gan St oo t Wer k 196,537.00 21,560.00 218,097.00

    Bahan

    Kayu Kaso 5 / 7 (borneo) 0.0882 m3 2,035,000.00 179,487.00

    Paku 0.5000 kg 34,100.00 17,050.00

    Tenaga

    Perkerja 0.1500 org 27,500.00 4,125 

    Tukang Kayu 0.2000 org 38,500.00 7,700 

    Kepala Tukang 0.2000 org 44,000.00 8,800 

    Mandor 0.0170 org 55,000.00 935 

    1 m2 Pasang Bekisting untuk Pondasi 72,325.00 19,679.00 92,004.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00

    Minyak Bekisting 0.100 Lt 4,950.00 495.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Kayu 0.260 Oh 38,500.00 10,010 

    Kepala Tukang 0.0260 Oh 44,000.00 1,144 

    Mandor 0.0050 Oh 55,000.00 275 

    1 m2 Pasang Bekisting untuk Sloof  72,325.00 19,679.00 92,004.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00

    Minyak Bekisting 0.100 Lt 4,950.00 495.00

    Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Kayu 0.260 Oh 38,500.00 10,010 

    Kepala Tukang 0.0260 Oh 44,000.00 1,144 

    Mandor 0.0050 Oh 55,000.00 275 

    1 m2 Pasang Bekisting untuk Kolom 132,955.00 22,737.00 155,692.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

    Minyak Bekisting 0.200 Lt 4,950.00 990.00

    Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00Tenaga

    Perkerja 0.300 Oh 27,500.00 8,250 

    Tukang Kayu 0.330 Oh 38,500.00 12,705 

    Kepala Tukang 0.0330 Oh 44,000.00 1,452 

    Mandor 0.0060 Oh 55,000.00 330 

    1 m2 Pasang Bekisting untuk Balok 137,755.00 23,287.00 161,042.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

  • 8/17/2019 TUGAS TPIIP1.pdf

    21/62

    Minyak Bekisting 0.200 Lt 4,950.00 990.00

    Balok Kayu Borneo 0.018 m3 1,600,000.00 28,800.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Kayu 0.330 Oh 38,500.00 12,705 

    Kepala Tukang 0.0330 Oh 44,000.00 1,452 

    Mandor 0.0060 Oh 55,000.00 330 

    1 m2 Pasang Bekisting untuk Lantai 163,755.00 22,379.50 186,134.50Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

    Minyak Bekisting 0.200 Lt 4,950.00 990.00

    Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Batu 0.330 Oh 35,750.00 11,798 

    Kepala Tukang 0.033 Oh 44,000.00 1,452 

    Mandor 0.006 Oh 55,000.00 330 

    1 m2 Pasang Bekisting untuk Dinding 449,755.00 23,287.00 473,042.00

    Bahan

    Kayu Terentang 0.040 m3 1,540,000.00 61,600.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

    Minyak Bekisting 0.200 Lt 4,950.00 990.00

    Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00Formtie / penjaga jarak bekisting 4.000 bh 71,500.00 286,000.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Kayu 0.330 Oh 38,500.00 12,705 

    Kepala Tukang 0.033 Oh 44,000.00 1,452 

    Mandor 0.006 Oh 55,000.00 330 

    1 m2 Pasang Bekisting untuk Tangga 117,307.50 23,287.00 140,594.50

    Bahan

    Kayu Terentang 0.030 m3 1,540,000.00 46,200.00

    Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

    Minyak Bekisting 0.150 Lt 4,950.00 742.50

    Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

    Plywood 9 mm 0.350 lbr 49,500.00 17,325.00

    Dolken Kayu GalamØ 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00

    Tenaga

    Perkerja 0.320 Oh 27,500.00 8,800 

    Tukang Kayu 0.330 Oh 38,500.00 12,705 

    Kepala Tukang 0.033 Oh 44,000.00 1,452 

    Mandor 0.006 Oh 55,000.00 330 

    1 m³ Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting ) 3,490,992.50 217,195.00 3,708,187.50

    Bahan

    Kayu Terentang 0.200 m3 1,540,000.00 308,000.00

    Paku Biasa 2" - 5" 1.500 Kg 34,100.00 51,150.00

    Minyak Bekisting 0.400 Lt 4,950.00 1,980.00

    Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00

    Kawat Beton 2.250 Kg 21,450.00 48,262.50

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Tenaga

    Perkerja 3.900 Oh 27,500.00 107,250 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 1.040 Oh 38,500.00 40,040 

    Tukang Besi 1.050 Oh 35,750.00 37,538 

    Kepala Tukang 0.245 Oh 44,000.00 10,780 

    Mandor 0.165 Oh 55,000.00 9,075 

    1 m³ Membuat Sloof Beton Bertulang ( 200 Kg + bekisting ) 4,432,920.00 279,911.50 4,712,831.50

    BahanKayu Terentang 0.270 m3 1,540,000.00 415,800.00

    Paku Biasa 2" - 5" 2.000 Kg 34,100.00 68,200.00

    Minyak Bekisting 0.600 Lt 4,950.00 2,970.00

    Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00

    Kawat Beton 3.000 Kg 21,450.00 64,350.00

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Tenaga

    Perkerja 4.850 Oh 27,500.00 133,375 

  • 8/17/2019 TUGAS TPIIP1.pdf

    22/62

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 1.560 Oh 38,500.00 60,060 

    Tukang Besi 1.400 Oh 35,750.00 50,050 

    Kepala Tukang 0.331 Oh 44,000.00 14,564 

    Mandor 0.170 Oh 55,000.00 9,350 

    1 m³ Membuat Kolom Beton Bertulang ( 300 Kg + bekisting ) 6,961,925.00 454,217.50 7,416,142.50

    Bahan

    Kayu Terentang 0.400 m3 1,540,000.00 616,000.00

    Paku Biasa 2" - 5" 4.000 Kg 34,100.00 136,400.00

    Minyak Bekisting 2.000 Lt 4,950.00 9,900.00Besi Beton Polos 300.000 Kg 16,000.00 4,800,000.00

    Kawat Beton 4.500 Kg 21,450.00 96,525.00

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Kayu Balok Borneo 0.150 m3 1,815,000.00 272,250.00

    Plywood 9 mm 3.500 lbr 49,500.00 173,250.00

    Dolken Ø 8 / 4 m 20.000 btg 8,800.00 176,000.00

    Tenaga

    Perkerja 7.300 Oh 27,500.00 200,750 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 3.300 Oh 38,500.00 127,050 

    Tukang Besi 2.100 Oh 35,750.00 75,075 

    Kepala Tukang 0.570 Oh 44,000.00 25,080 

    Mandor 0.250 Oh 55,000.00 13,750 

    1 m³ Membuat Balok Beton Bertulang ( 200 Kg + bekisting ) 5,089,290.00 365,722.50 5,455,012.50

    Bahan

    Kayu Terentang 0.320 m3 1,540,000.00 492,800.00

    Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00

    Minyak Bekisting 1.600 Lt 4,950.00 7,920.00Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00

    Kawat Beton 3.000 Kg 21,450.00 64,350.00

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Kayu Balok Borneo 0.140 m3 1,815,000.00 254,100.00

    Plywood 9 mm 2.800 lbr 49,500.00 138,600.00

    Dolken Ø 8 / 4 m 16.000 btg 8,800.00 140,800.00

    Tenaga

    Perkerja 5.960 Oh 27,500.00 163,900 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 2.800 Oh 38,500.00 107,800 

    Tukang Besi 1.400 Oh 35,750.00 50,050 

    Kepala Tukang 0.455 Oh 44,000.00 20,020 

    Mandor 0.208 Oh 55,000.00 11,440 

    1 m³ Membuat Balok Beton Bertulang ( 150 Kg + bekisting ) 4,377,702.50 346,005.00 4,723,707.50

    Bahan

    Kayu Terentang 0.320 m3 1,540,000.00 492,800.00

    Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00

    Minyak Bekisting 1.600 Lt 4,950.00 7,920.00

    Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00

    Kawat Beton 2.250 Kg 21,450.00 48,262.50

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Kayu Balok Borneo 0.120 m3 1,815,000.00 217,800.00

    Plywood 9 mm 2.800 lbr 49,500.00 138,600.00

    Dolken Ø 8 / 4 m 32.000 btg 8,800.00 281,600.00

    Tenaga

    Perkerja 5.800 Oh 27,500.00 159,500 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 2.800 Oh 38,500.00 107,800 

    Tukang Besi 1.050 Oh 35,750.00 37,538 

    Kepala Tukang 0.420 Oh 44,000.00 18,480 

    Mandor 0.185 Oh 55,000.00 10,175 

    1 m³ Membuat Dinding Beton Bertulang ( 150 Kg + bekisting ) 4,256,702.50 333,905.00 4,590,607.50

    Bahan

    Kayu Terentang 0.240 m3 1,540,000.00 369,600.00

    Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00Minyak Bekisting 1.600 Lt 4,950.00 7,920.00

    Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00

    Kawat Beton 2.250 Kg 21,450.00 48,262.50

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Kayu Balok Borneo 0.160 m3 1,815,000.00 290,400.00

    Plywood 9 mm 2.800 lbr 49,500.00 138,600.00

    Dolken Ø 8 / 4 m 24.000 btg 8,800.00 211,200.00

    Tenaga

  • 8/17/2019 TUGAS TPIIP1.pdf

    23/62

    Perkerja 5.600 Oh 27,500.00 154,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 2.640 Oh 38,500.00 101,640 

    Tukang Besi 1.050 Oh 35,750.00 37,538 

    Kepala Tukang 0.400 Oh 44,000.00 17,600 

    Mandor 0.193 Oh 55,000.00 10,615 

    1 m³ Membuat Tangga Beton Bertulang ( 200 Kg + bekisting ) 4,876,715.00 334,042.50 5,210,757.50

    Bahan

    Kayu Terentang 0.250 m3 1,540,000.00 385,000.00

    Paku Biasa 2" - 5" 3.000 Kg 34,100.00 102,300.00Minyak Bekisting 1.200 Lt 4,950.00 5,940.00

    Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00

    Kawat Beton 3.000 Kg 21,450.00 64,350.00

    Semen Portland 323.000 Kg 1,100.00 355,300.00

    Pasir Beton 0.520 m3 215,000.00 111,800.00

    Koral Beton 0.780 m3 275,000.00 214,500.00

    Kayu Balok Borneo 0.105 m3 1,815,000.00 190,575.00

    Plywood 9 mm 2.500 lbr 49,500.00 123,750.00

    Dolken Ø 8 / 4 m 14.000 btg 8,800.00 123,200.00

    Tenaga

    Perkerja 5.600 Oh 27,500.00 154,000 

    Tukang Batu 0.350 Oh 35,750.00 12,513 

    Tukang Kayu 2.300 Oh 38,500.00 88,550 

    Tukang Besi 1.400 Oh 35,750.00 50,050 

    Kepala Tukang 0.405 Oh 44,000.00 17,820 

    Mandor 0.202 Oh 55,000.00 11,110 

    1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 69,238.50 4,279.00 73,517.50

    Bahan

    Kayu Terentang 0.002 m3 1,540,000.00 3,080.00

    Paku Biasa 2" - 5" 0.010 Kg 34,100.00 341.00Besi Beton Polos 3.000 Kg 16,000.00 48,000.00

    Kawat Beton 0.450 Kg 21,450.00 9,652.50

    Semen Portland 4.000 Kg 1,100.00 4,400.00

    Pasir Beton 0.006 m3 215,000.00 1,290.00

    Koral Beton 0.009 m3 275,000.00 2,475.00

    Tenaga

    Perkerja 0.060 Oh 27,500.00 1,650 

    Tukang Batu 0.020 Oh 35,750.00 715 

    Tukang Kayu 0.020 Oh 38,500.00 770 

    Tukang Besi 0.020 Oh 35,750.00 715 

    Kepala Tukang 0.006 Oh 44,000.00 264 

    Mandor 0.003 Oh 55,000.00 165 

    1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 79,087.50 17,712.75 96,800.25

    Bahan

    Kayu Albasiah 0.003 m3 495,000.00 1,485.00

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Besi Beton Polos 3.600 Kg 16,000.00 57,600.00

    Kawat Beton 0.050 Kg 21,450.00 1,072.50

    Semen Portland 5.500 Kg 1,100.00 6,050.00

    Pasir Beton 0.009 m3 215,000.00 1,935.00

    Koral Beton 0.015 m3 275,000.00 4,125.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Batu 0.330 Oh 35,750.00 11,798 

    Tukang Kayu 0.033 Oh 38,500.00 1,271 

    Tukang Besi 0.033 Oh 35,750.00 1,180 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.005 Oh 55,000.00 275 

    V PEKERJAAN PENTUP ATAP

    1m² Pasang Atap Genteng Palentong Kecil 41,250.00 7,804.50 49,054.50

    Bahan

    Genteng Palentong 25.000 bh 1,650.00 41,250.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.075 Oh 38,500.00 2,888 

    Kepala Tukang 0.008 Oh 44,000.00 352 

    Mandor 0.008 Oh 55,000.00 440 

    1m² Pasang Atap Genteng Kodok / Glazzur  126,500.00 7,804.50 134,304.50Bahan

    Genteng Kodok 25.000 bh 5,060.00 126,500.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.075 Oh 38,500.00 2,888 

    Kepala Tukang 0.008 Oh 44,000.00 352 

    Mandor 0.008 Oh 55,000.00 440 

    1m² Pasang Atap Genteng Palentong Super / Besar  29,040.00 7,139.00 36,179.00

    Bahan

  • 8/17/2019 TUGAS TPIIP1.pdf

    24/62

    Genteng Palentong Super 12.000 bh 2,420.00 29,040.00

    Tenaga

    Perkerja 0.150 Oh 27,500.00 4,125 

    Tukang Kayu 0.060 Oh 38,500.00 2,310 

    Kepala Tukang 0.006 Oh 44,000.00 264 

    Mandor 0.008 Oh 55,000.00 440 

    1m' Pas an g Gen ten g B ub un g Palen to ng 40,430.00 19,690.00 60,120.00

    Bahan

    Genteng Bubung Palentong 5.000 bh 4,950.00 24,750.00

    Semen Portland 8.000 Kg 1,100.00 8,800.00Pasir Pasang 0.032 m3 215,000.00 6,880.00

    Tenaga

    Perkerja 0.400 Oh 27,500.00 11,000 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.002 Oh 55,000.00 110 

    1m' Pasang Genteng Bubung Kodok Glazzur  54,180.00 19,690.00 73,870.00

    Bahan

    Genteng Bubung Kodok 5.000 bh 7,700.00 38,500.00

    Semen Portland 8.000 Kg 1,100.00 8,800.00

    Pasir Pasang 0.032 m3 215,000.00 6,880.00

    Tenaga

    Perkerja 0.400 Oh 27,500.00 11,000 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.002 Oh 55,000.00 110 

    1m' Pasang Genteng Bubung Palentong Besar  35,480.00 19,690.00 55,170.00

    Bahan

    Genteng Bubung Palentong 4.000 bh 4,950.00 19,800.00Semen Portland 8.000 Kg 1,100.00 8,800.00

    Pasir Pasang 0.032 m3 215,000.00 6,880.00

    Tenaga

    Perkerja 0.400 Oh 27,500.00 11,000 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.002 Oh 55,000.00 110 

    1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm 232,705.00 7,122.50 239,827.50

    Bahan

    Roof Light Fiberglass 0.600 lbr 385,000.00 231,000.00

    Paku 0.050 Kg 34,100.00 1,705.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 13,992.00 7,529.50 21,521.50

    Bahan

     Asbes Gelombang 0.500 lbr 19,800.00 9,900.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.075 Oh 38,500.00 2,888 

    Kepala Tukang 0.008 Oh 44,000.00 352 

    Mandor 0.008 Oh 55,000.00 440 

    1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 15,972.00 7,529.50 23,501.50

    Bahan

     Asbes Gelombang 0.600 lbr 19,800.00 11,880.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.075 Oh 38,500.00 2,888 

    Kepala Tukang 0.008 Oh 44,000.00 352 

    Mandor 0.008 Oh 55,000.00 440 

    1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 15,972.00 7,238.00 23,210.00

    Bahan

     Asbes Gelombang 0.600 lbr 19,800.00 11,880.00Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.070 Oh 38,500.00 2,695 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 18,942.00 7,238.00 26,180.00

    Bahan

     Asbes Gelombang 0.750 lbr 19,800.00 14,850.00

  • 8/17/2019 TUGAS TPIIP1.pdf

    25/62

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.070 Oh 38,500.00 2,695 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 11,022.00 7,238.00 18,260.00

    Bahan

     Asbes Gelombang 0.350 lbr 19,800.00 6,930.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.070 Oh 38,500.00 2,695 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 12,408.00 7,238.00 19,646.00

    Bahan

     Asbes Gelombang 0.420 lbr 19,800.00 8,316.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.070 Oh 38,500.00 2,695 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 12,804.00 7,122.50 19,926.50

    Bahan

     Asbes Gelombang 0.440 lbr 19,800.00 8,712.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 14,190.00 7,122.50 21,312.50

    Bahan

     Asbes Gelombang 0.510 lbr 19,800.00 10,098.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 19,932.00 7,122.50 27,054.50

    Bahan

     Asbes Gelombang 0.800 lbr 19,800.00 15,840.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 11,418.00 7,122.50 18,540.50

    Bahan

     Asbes Gelombang 0.370 lbr 19,800.00 7,326.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 11,616.00 7,122.50 18,738.50

    Bahan

     Asbes Gelombang 0.380 lbr 19,800.00 7,524.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 13,200.00 7,122.50 20,322.50

    Bahan

     Asbes Gelombang 0.460 lbr 19,800.00 9,108.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

  • 8/17/2019 TUGAS TPIIP1.pdf

    26/62

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 13,794.00 7,122.50 20,916.50

    Bahan

     Asbes Gelombang 0.490 lbr 19,800.00 9,702.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 15,378.00 7,122.50 22,500.50

    Bahan

     Asbes Gelombang 0.570 lbr 19,800.00 11,286.00

    Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

    Tenaga

    Perkerja 0.140 Oh 27,500.00 3,850 

    Tukang Kayu 0.067 Oh 38,500.00 2,580 

    Kepala Tukang 0.007 Oh 44,000.00 308 

    Mandor 0.007 Oh 55,000.00 385 

    1m' Pasang Bubung Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50

    Bahan

     Asbes Gelombang 2.400 lbr 19,800.00 47,520.00

    Paku Pancing 60 x 230 6.000 Kg 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50

    Bahan

     Asbes Gelombang 2.400 lbr 19,800.00 47,520.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Stel Gelombang 1.05m 246,180.00 7,914.50 254,094.50

    Bahan

     Asbes Gelombang 2.100 lbr 19,800.00 41,580.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Stel Gelombang 1.08m 245,190.00 7,914.50 253,104.50

    Bahan

     Asbes Gelombang 2.050 lbr 19,800.00 40,590.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Paten 0.92m 208,560.00 7,914.50 216,474.50

    Bahan

    Nok Paten 1.200 lbr 3,300.00 3,960.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Paten 1.05m 208,560.00 7,914.50 216,474.50

    Bahan

    Nok Paten 1.200 lbr 3,300.00 3,960.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

  • 8/17/2019 TUGAS TPIIP1.pdf

    27/62

    1m' Pasang Nok Paten 1.08m 208,560.00 7,914.50 216,474.50

    Bahan

    Nok Paten 1.200 lbr 3,300.00 3,960.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Stel rata 0.92m 209,440.00 9,317.00 218,757.00

    Bahan

    Nok Stel rata 1.100 lbr 4,400.00 4,840.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.100 Oh 27,500.00 2,750 

    Tukang Kayu 0.150 Oh 38,500.00 5,775 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m' Pasang Nok Stel rata 1.05m 209,440.00 7,914.50 217,354.50

    Bahan

    Nok Stel rata 1.100 lbr 4,400.00 4,840.00

    Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00

    Tenaga

    Perkerja 0.084 Oh 27,500.00 2,310 

    Tukang Kayu 0.125 Oh 38,500.00 4,813 

    Kepala Tukang 0.013 Oh 44,000.00 572 

    Mandor 0.004 Oh 55,000.00 220 

    1m² Pasang Atap Genteng Beton 92,983.00 10,340.00 103,323.00Bahan

    Genteng Beton 11.000 lbr 8,360.00 91,960.00

    Paku Biasa 2" - 5" 0.030 bh 34,100.00 1,023.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Atap Genteng Aspal 92,378.00 17,732.00 110,110.00

    Bahan

    Genteng Aspal 6.900 lbr 11,000.00 75,900.00

    Plywood 4 mm 0.350 lbr 42,900.00 15,015.00

    Paku Biasa 1/2" - 1" 0.030 Kg 34,100.00 1,023.00

    Plastic Aerator 0.500 Bh 880.00 440.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.300 Oh 38,500.00 11,550 

    Kepala Tukang 0.003 Oh 44,000.00 132 

    Mandor 0.010 Oh 55,000.00 550 

    1m² Pasang Atap Genteng Metal 51,475.60 9,845.00 61,320.60

    Bahan

    Genteng Metal 1.020 lbr 43,780.00 44,655.60

    Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.200 Oh 27,500.00 5,500 

    Tukang Kayu 0.100 Oh 38,500.00 3,850 

    Kepala Tukang 0.010 Oh 44,000.00 440 

    Mandor 0.001 Oh 55,000.00 55 

    1m² Pasang Atap Sirap 34,320.00 15,730.00 50,050.00

    Bahan

    Genteng Sirap 60.000 lbr 458.33 27,500.00

    Paku Biasa ½" - 1" 0.200 Kg 34,100.00 6,820.00

    Tenaga

    Perkerja 0.166 Oh 27,500.00 4,565 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 

    Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.008 Oh 55,000.00 440 

    1m' Pasang Nok Genteng Beton 51,045.00 20,680.00 71,725.00

    Bahan

    Genteng Beton 3.500 lbr 8,360.00 29,260.00

    Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

    Semen abu -abu 10.800 Kg 1,100.00 11,880.00

    Pasir Pasang 0.032 m3 215,000.00 6,880.00

    Semen Warna 1.000 Kg 1,320.00 1,320.00

    Tenaga

    Perkerja 0.400 Oh 27,500.00 11,000 

    Tukang Kayu 0.200 Oh 38,500.00 7,700 

  • 8/17/2019 TUGAS TPIIP1.pdf

    28/62

    Kepala Tukang 0.020 Oh 44,000.00 880 

    Mandor 0.020 Oh 55,000.00 1,100 

    1m' Pasang Nok Genteng Aspal 29,305.00 14,492.50 43,797.50

    Bahan

    Genteng Aspal 2.000 lbr 11,000.00 22,000.00

    Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00

    Balok Kayu Borneo 0.0035 Kg 1,600,000.00 5,600.00

    Tenaga

    Perkerja 0.125 Oh 27,500.00 3,438 

    Tukang Kayu 0.250 Oh 38,500.00 9,625 Kepala Tukang 0.025 Oh 44,000.00 1,100 

    Mandor 0.006 Oh 55,000.00 330 

    1m' Pasang Nok Genteng Metal 44,055.00 14,025.00 58,080.00

    Bahan

    Genteng Decra Bond 1.100 lbr 38,500.00 42,350.0