Tugas Modul IV Nur Lailatul Fitriyah (11521092)

5
LAPORAN SEMENTARA PRAKTIKUM KOMPUTASI PROSES MODUL IV RUANG KAPILER DALAM BENANG Oleh: Nama : Nur Lailatul Fitriyah Nim : 11521092 Hari Praktikum : Selasa, April 2014 Waktu Praktikum : 15.30 – 17.00 WIB Mengetahui, Kalab. Komputasi Proses (Ir. Dalyono M., MSI, CText ATI) Asisten Pembimbing (Nur Khamidah)

description

Tugas Modul IV komputasi Proses

Transcript of Tugas Modul IV Nur Lailatul Fitriyah (11521092)

Page 1: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

LAPORAN SEMENTARA

PRAKTIKUM KOMPUTASI PROSES

MODUL IV

RUANG KAPILER DALAM BENANG

Oleh:Nama : Nur Lailatul FitriyahNim : 11521092Hari Praktikum : Selasa, April 2014Waktu Praktikum : 15.30 – 17.00 WIB

Mengetahui,Kalab. Komputasi Proses

(Ir. Dalyono M., MSI, CText ATI)

Asisten Pembimbing

(Nur Khamidah)

LABORATORIUM KOMPUTASI PROSESJURUSAN TEKNIK KIMIA

KONSENTRASI TEKNIK TEKSTILFAKULTAS TEKNOLOGI INDUSTRIUNIVERSITAS ISLAM INDONESIA

YOGYAKARTA2014

Page 2: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

A B C D E F G H1 Jumlah serat 19 37 61 91 127 169 2172 Total pori-pori serat 24 54 96 150 216 294 3843 Jumlah serat 92            4 -3.055555556 -0.7381 -0.0139 0.32407 0.51333 0.63131 -0.079  5 -1.291666667 -0.0185 0.38889 0.58333 0.69444 4.05556 0.82524  6 -0.033333333 0.5303 0.71296 0.80128 1.7381 2.29167 -3.8615  7 0.972222222 0.98718 0.99206 1.01389 1.01852 1.03333 152.403  8 1.833333333 1.38889 0.67593 0.61111 0.4697 0.02778 2.96413  9 2.604166667 0.48667 0.41667 0.28704 0.01282 -0.8333 -0.4761  10 0.368686869 0.30556 0.19872 0.00794 -0.3889 -1.6042 0.04256  11           Jumlah pori-pori 151.818  

Page 3: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

A B C D E F G H1 Jumlah serat 19 37 61 91 127 169 2172 Total pori-pori

serat24 54 96 150 216 294 384

3 Jumlah serat 92            4

(92-37)/(19-37) (92-61)/(19-61) (92-91)/(19-91)(92-127)/(19-127)

(92-169)/(19-169)

(92-217)/(19-217)

-0.079  

5(92-61)/(37-61) (92-91)/(37-91)

(92-127)/(37-127)

(92-169)/(37-169)

(92-217)/(37-217)

(92-19)/(37-19) 0.82524  

6(92-91)/(61-91)

(92-127)/(61-127)

(92-169)/(61-169)

(92-217)/(61-217)

(92-19)/(61-19) (92-37)/(61-37) -3.8615  

7 (92-127)/(91-127)

(92-169)/(91-169)

(92-217)/(91-217)

(92-19)/(91-19) (92-37)/(91-37) (92-61)/(91-61) 152.403  

8 (92-169)/(127-169)

(92-217)/(127-217)

(92-19)/(127-19)

(92-37)/(127-37)

(92-61)/(127-61) (92-91)/(127-91) 2.96413  

9 (92-217)/(169-217)

(92-19)/(169-19)

(92-37)/(169-37)

(92-61)/(169-61)

(92-91)/(169-91)(92-127)/(169-127)

-0.4761  

10 (92-19)/(217-19)

(92-37)/(217-37)

(92-61)/(217-61)

(92-91)/(217-91)

(92-127)/(217-127)

(92-169)/(217-169)

0.04256  

11           Jumlah pori-pori 151.818