 ANALISA HARGA SATUAN S.N.I NO. U R A I A N KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL h  A B C D E F G = ( C X E ) H = (C X F ) I = ( G + H I PEKERJAAN PERSIAPAN ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 0.00 38,691.56 38, Bahan Dolken Kayu Ø 8 - 10/400 cm 1.250 btg - Rp - Rp Semen Por tland 2.500 Kg - Rp - Rp Pasir Beton 0.005 m3 - Rp - Rp Koral Beton 0.009 m3 - Rp - Rp Kaso 5 / 7 ( albasiah ) 0.072 m3 - Rp - Rp Paku Biasa 2" - 5" 0.060 Kg - Rp - Rp Residu 0.400 Lt - Rp - Rp Tenaga Tukang Kayu 0.200 Oh 65,734.00 Rp 13,146.80 Rp Perkerja 0.400 Oh 55,798.00 Rp 22,319.20 Rp Kepala Tukang 0.020 Oh 75,671.00 Rp 1,513.42 Rp Mandor 0.020 Oh 85,607.00 Rp 1,712.14 Rp ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 0.00 38,691.56 38, Bahan Dolken Kayu Ø 8 - 10/400 cm 1.250 btg - Rp 0.00 Semen Por tland 2.500 Kg - Rp 0.00 Pasir Beton 1.200 m3 - Rp 0.00 Koral Beton 0.009 m3 - Rp 0.00 Kaso 5 / 7 ( albasiah ) 0.072 m3 - Rp 0.00 Paku Biasa 2" - 5" 0.060 Kg - Rp 0.00 Meni Besi 0.450 Lt - Rp 0.00 Tenaga Tukang Kayu 0.200 Oh 65,734.00 Rp 13,146.80 Rp Perkerja 0.400 Oh 55,798.00 Rp 22,319.20 Rp Kepala Tukang 0.020 Oh 75,671.00 Rp 1,513.42 Rp Mandor 0.020 Oh 85,607.00 Rp 1,712.14 Rp ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 0.00 33,111.76 33, Bahan Dolken Kayu Ø 8 - 10/400 cm 1.000 btg - Rp 0.00 Semen Por tland 2.000 Kg - Rp 0.00 Kawat Duri 25.000 Kg - Rp 0.00 Pasir Beton 0.005 m3 - Rp 0.00 Koral Beton 0.009 m3 - Rp 0.00 Paku Biasa 2" - 5" 0.060 Kg - Rp 0.00 Tenaga Tukang Kayu 0.200 Oh 65,734.00 Rp 13,147  Perkerja 0.300 Oh 55,798.00 Rp 16,739  Kepala Tukang 0.020 Oh 75,671.00 Rp 1,513  Mandor 0.020 Oh 85,607.00 Rp 1,712  ANALISA 004 1 m Pek. Pengukuran kembali (site) & Pemasangan Bowplank 0.00 13,337.95 13, Bahan Kayu Kaso 5 / 7 (borneo) 0.012 m3 - Rp 0.00 Paku Biasa 2" - 5" 0.020 Kg - Rp 0.00 Kayu Papan 3 / 20 borneo 0.007 m3 - Rp 0.00 Tenaga Tukang Kayu 0.100 Oh 65,734.00 Rp 6,573  Perkerja 0.100 Oh 55,798.00 Rp 5,580  Kepala Tukang 0.010 Oh 75,671.00 Rp 757  Mandor 0.005 Oh 85,607.00 Rp 428  ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 0.00 0.00 Bahan Dolken Kayu Ø 8 - 10/400 cm 1.250 btg - Rp 0.00 Kayu Balok Borneo 0.180 m3 - Rp 0.00 Paku 0.850 Kg - Rp 0.00 Besi Strip 1.100 Kg - Rp 0.00 Semen Por tland 35.000 Kg - Rp 0.00 Pasir Pasang 0.150 m3 - Rp 0.00 Pasir Beton 0.100 m3 - Rp 0.00 Koral Beton 0.150 m3 - Rp 0.00 Bata merah kelas I 30.000 bh - Rp 0.00 Seng Plat 0.250 lbr - Rp 0.00 Jendela Nako 2.000 bh - Rp 0.00 Kaca Polos 0.080 m2 - Rp 0.00 Kunci Tanam 0.150 bh - Rp 0.00 Plywood 4 mm 0.060 lbr - Rp 0.00 Tenaga Tukang Kayu 2.000 Oh - Rp -  Tukang Batu 1.000 Oh - Rp -  Perkerja 2.000 Oh - Rp -  Kepala Tukang 0.300 Oh - Rp -  Mandor 0.050 Oh - Rp -  ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 0.00 0.00 Bahan Dolken Kayu Ø 8 - 10/400 cm 1.700 btg - Rp 0.00 Kayu Balok Borneo 0.210 m3 - Rp 0.00 Paku 0.300 Kg - Rp 0.00 Semen Por tland 10.500 Kg - Rp 0.00 Pasir Beton 0.030 m3 Rp 0.00

Transcript of SNI-ANALISA

Page 1: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 1/37

 

ANALISA HARGA SATUAN S.N.I

NO. U R A I A N KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah

 A B C D E F G = ( C X E ) H = (C X F )

I PEKERJAAN PERSIAPAN

ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 0.00 38,691.56

Bahan

Dolken Kayu Ø 8 - 10/400 cm 1.250 btg -Rp  -Rp Semen Por tland 2.500 Kg -Rp  -Rp 

Pasir Beton 0.005 m3 -Rp  -Rp 

Koral Beton 0.009 m3 -Rp  -Rp 

Kaso 5 / 7 ( albasiah ) 0.072 m3 -Rp  -Rp 

Paku Biasa 2" - 5" 0.060 Kg -Rp  -Rp 

Residu 0.400 Lt -Rp  -Rp 

Tenaga

Tukang Kayu 0.200 Oh 65,734.00Rp  13,146.80Rp 

Perkerja 0.400 Oh 55,798.00Rp  22,319.20Rp 

KepalaT

ukang  0.020 Oh 75,671.00Rp  1,513.42Rp Mandor  0.020 Oh 85,607.00Rp  1,712.14Rp 

ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 0.00 38,691.56

Bahan

Dolken Kayu Ø 8 - 10/400 cm 1.250 btg -Rp  0.00

Semen Por tland 2.500 Kg -Rp  0.00

Pasir Beton 1.200 m3 -Rp  0.00

Koral Beton 0.009 m3 -Rp  0.00

Kaso 5 / 7 ( albasiah ) 0.072 m3 -Rp  0.00

Paku Biasa 2" - 5" 0.060 Kg -Rp  0.00

Meni Besi 0.450 Lt -Rp  0.00

Tenaga

Tukang Kayu 0.200 Oh 65,734.00Rp  13,146.80Rp 

Perkerja 0.400 Oh 55,798.00Rp  22,319.20Rp 

Kepala Tukang  0.020 Oh 75,671.00Rp  1,513.42Rp 

Mandor  0.020 Oh 85,607.00Rp  1,712.14Rp 

ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 0.00 33,111.76

Bahan

Dolken Kayu Ø 8 - 10/400 cm 1.000 btg -Rp  0.00

Semen Por tland 2.000 Kg -Rp  0.00

Kawat Duri 25.000 Kg -Rp  0.00

Pasir Beton 0.005 m3 -Rp  0.00

Koral Beton 0.009 m3 -Rp  0.00

Paku Biasa 2" - 5" 0.060 Kg -Rp  0.00

Tenaga

Tukang Kayu 0 200 Oh 65 734 00Rp 13 147

Page 2: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 2/37

 

Tenaga

Tukang Kayu 2.000 Oh 38,500.00 77,000 

Mandor  0.050 Oh 55,000.00 2,750 

ANALISA 011 1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 17,600.00 116,050.00

Bahan

BambuØ 6 - 8 / 600 cm 1.000 btg 13,200.00 13,200.00

Tali Ijuk 0.250 Kg 17,600.00 4,400.00

Tenaga

Tukang Kayu 2.000 Oh 38,500.00 77,000 

Perkerja 1.000 Oh 27,500.00 27,500 

Kepala Tukang  0.200 Oh 44,000.00 8,800 

Mandor  0.050 Oh 55,000.00 2,750 

ANALISA 012 1 m² Pembuatan Jalan Sementara 55,280.00 30,250.00

Bahan

Batu Belah 5 / 20 0.150 m3 209,000.00 31,350.00

Batu Belah 5 / 7 0.090 m3 242,000.00 21,780.00

Pasir Pasang  0.010 m3 215,000.00 2,150.00

Tenaga

Perkerja 1.000 Oh 27,500.00 27,500 Mandor  0.050 Oh 55,000.00 2,750 

ANALISA 013 1 m³ Bongkaran Beton Bertulang 0.00 201,657.50

Tenaga

Perkerja 6.667 Oh 27,500.00 183,343 

Mandor  0.333 Oh 55,000.00 18,315 

ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 185,157.50

Tenaga

Perkerja 6.667 Oh 27,500.00 183,343 Mandor  0.033 Oh 55,000.00 1,815 

II PEKERJAAN TANAH

ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 13,200.00

Tenaga

Perkerja 0.400 Oh 27,500.00 11,000 

Tukang Gali Oh 33,000.00 - 

Kepala Tukang  Oh 44,000.00 - 

Mandor  0.040 Oh 55,000.00 2,200 

ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 17,297.50

Tenaga

Perkerja 0.525 Oh 27,500.00 14,438 

Tukang Gali Oh 33,000.00 - 

Kepala Tukang  Oh 44,000.00 - 

Mandor  0.052 Oh 55,000.00 2,860 

Page 3: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 3/37

 

ANALISA 028 1 m3 Pasangan Batu kali 1 Pc : 3Ps 710,460.00 69,465.00

Bahan

Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00

Semen Por tland 392.000 Kg 1,100.00 431,200.00

Pasir Pasang  0.314 m3 215,000.00 67,510.00

Tenaga

Perkerja 1.500 Oh 27,500.00 41,250 

Tukang Batu 0.600 Oh 35,750.00 21,450 

Kepala Tukang  0.060 Oh 44,000.00 2,640 

Mandor  0.075 Oh 55,000.00 4,125 

ANALISA 029 1 m3 Pasangan Batu kali 1 Pc : 5Ps 478,310.00 69,465.00

Bahan

Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00

Semen Por tland 136.000 Kg 1,100.00 149,600.00

Pasir Pasang  0.544 m3 215,000.00 116,960.00

Tenaga

Perkerja 1.500 Oh 27,500.00 41,250 

Tukang Batu 0.600 Oh 35,750.00 21,450 

Kepala Tukang  0.060 Oh 44,000.00 2,640 Mandor  0.075 Oh 55,000.00 4,125 

IV PEKERJAAN DINDING

ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata 140,510.00 27,555.00

Bahan

Bata merah kelas I 140.000 bh 605.00 84,700.00

Semen Por tland 32.950 Kg 1,100.00 36,245.00

Pasir Pasang  0.091 m3 215,000.00 19,565.00

Tenaga

Perkerja 0.650 Oh 27,500.00 17,875 Tukang Batu 0.200 Oh 35,750.00 7,150 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.030 Oh 55,000.00 1,650 

ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata 131,050.00 27,555.00

Bahan

Bata merah kelas I 140.000 bh 605.00 84,700.00

Semen Por tland 22.200 Kg 1,100.00 24,420.00

Pasir Pasang  0.102 m3 215,000.00 21,930.00

TenagaPerkerja 0.650 Oh 27,500.00 17,875 

Tukang Batu 0.200 Oh 35,750.00 7,150 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.030 Oh 55,000.00 1,650 

ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 66,757.00 13,640.00 

Page 4: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 4/37

Tukang Batu 0.150 Oh 35,750.00 5,363 

Kepala Tukang  0.015 Oh 44,000.00 660 

Mandor  0.010 Oh 55,000.00 550 

ANALISA 039 1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm 20,653.00 15,592.50

Bahan

Semen Por tland 14.280 Kg 1,100.00 15,708.00

Pasir Pasang  0.023 m3 215,000.00 4,945.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Batu 0.200 Oh 35,750.00 7,150 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.0125 Oh 55,000.00 688 

ANALISA 040 1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm 17,470.00 15,592.50

Bahan

Semen Por tland 10.800 Kg 1,100.00 11,880.00

Pasir Pasang  0.026 m3 215,000.00 5,590.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Batu 0.200 Oh 35,750.00 7,150 Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.0125 Oh 55,000.00 688 

ANALISA 041 1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm 15,568.00 15,592.50

Bahan

Semen Por tland 8.680 Kg 1,100.00 9,548.00

Pasir Pasang  0.028 m3 215,000.00 6,020.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Batu 0.200 Oh 35,750.00 7,150 Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.0125 Oh 55,000.00 688 

ANALISA 042 1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm 14,039.00 15,592.50

Bahan

7.29 Semen Por tland 7.290 Kg 1,100.00 8,019.00

Pasir Pasang  0.028 m3 215,000.00 6,020.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Batu 0.200 Oh 35,750.00 7,150 Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.0125 Oh 55,000.00 688 

ANALISA 043 1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm 13,314.00 15,592.50

Bahan

Semen Por tland 6.240 Kg 1,100.00 6,864.00 

P k j 0 320 Oh 27 500 00 8 800

Page 5: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 5/37

Perkerja 0.320 Oh 27,500.00 8,800 

Tukang Batu 0.250 Oh 35,750.00 8,938 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.015 Oh 55,000.00 825 

ANALISA 053 1 m2 Berapen 1Pc : 3Ps, tebal 30 mm 12,292.00 7,375.50

Bahan

Semen Por tland 7.070 Kg 1,100.00 7,777.00

Pasir Pasang  0.021 m3 215,000.00 4,515.00

Tenaga

Perkerja 0.150 Oh 27,500.00 4,125 

Tukang Batu 0.070 Oh 35,750.00 2,503 

Kepala Tukang  0.007 Oh 44,000.00 308 

Mandor  0.008 Oh 55,000.00 440 

ANALISA 054 1 m2 Berapen 1Pc : 5Ps, tebal 15 mm 11,182.00 7,375.50

Bahan

Semen Por tland 5.670 Kg 1,100.00 6,237.00

Pasir Pasang  0.023 m3 215,000.00 4,945.00

Tenaga

Perkerja 0.150 Oh 27,500.00 4,125 Tukang Batu 0.070 Oh 35,750.00 2,503 

Kepala Tukang  0.007 Oh 44,000.00 308 

Mandor  0.008 Oh 55,000.00 440 

ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 14,100.00 15,895.00

Bahan

Semen Por tland 9.300 Kg 1,100.00 10,230.00

Pasir Pasang  0.018 m3 215,000.00 3,870.00

Tenaga

Perkerja 0.260 Oh 27,500.00 7,150 Tukang Batu 0.200 Oh 35,750.00 7,150 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.013 Oh 55,000.00 715 

ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 12,292.00 15,895.00

Bahan

Semen Por tland 7.070 Kg 1,100.00 7,777.00

Pasir Pasang  0.021 m3 215,000.00 4,515.00

Tenaga

Perkerja 0.260 Oh 27,500.00 7,150 Tukang Batu 0.200 Oh 35,750.00 7,150 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.013 Oh 55,000.00 715 

ANALISA 057 1 m2 Pelesteran Skoring 1Pc : 2Ps 980.00 4,708.00

Bahan 

Perkerja 6 000 Oh 27 500 00 165 000

Page 6: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 6/37

Perkerja 6.000 Oh 27,500.00 165,000 

Tukang Kayu 18.000 Oh 38,500.00 693,000 

Kepala Tukang  2.000 Oh 44,000.00 88,000 

Mandor  0.300 Oh 55,000.00 16,500 

1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,442,000.00 962,500.00

Bahan

Kayu Balok Damar Laut 1.200 m3 2,035,000.00 2,442,000.00

Tenaga

Perkerja 6.000 Oh 27,500.00 165,000 

Tukang Kayu 18.000 Oh 38,500.00 693,000 

Kepala Tukang  2.000 Oh 44,000.00 88,000 

Mandor  0.300 Oh 55,000.00 16,500 

1m² Pasang Pintu Klamp Kayu Kamper 74,965.00 55,660.00

Bahan

Papan Kayu Kamper  0.036 m3 2,035,000.00 73,260.00

Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

Tenaga

Perkerja 0.350 Oh 27,500.00 9,625 

Tukang Kayu 1.050 Oh 38,500.00 40,425 Kepala Tukang  0.105 Oh 44,000.00 4,620 

Mandor  0.018 Oh 55,000.00 990 

1m² Pasang Pintu Klamp Kayu Borneo 74,965.00 55,660.00

Bahan

Papan Kayu Borneo 0.036 m3 2,035,000.00 73,260.00

Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

Tenaga

Perkerja 0.350 Oh 27,500.00 9,625 

Tukang Kayu 1.050 Oh 38,500.00 40,425 Kepala Tukang  0.105 Oh 44,000.00 4,620 

Mandor  0.018 Oh 55,000.00 990 

1m² Pasang Pintu Panel Kayu Jati 1,375,000.00 137,500.00

Bahan

Papan Kayu Jati 0.050 m3 27,500,000.00 1,375,000.00

Tenaga

Perkerja 1.000 Oh 27,500.00 27,500 

Tukang Kayu 2.500 Oh 38,500.00 96,250 

KepalaT

ukang  0.250 Oh 44,000.00 11,000 Mandor  0.050 Oh 55,000.00 2,750 

1m² Pasang Pintu Panel Kayu Kamper 81,400.00 137,500.00

Bahan

Papan Kayu Kamper  0.040 m3 2,035,000.00 81,400.00

Tenaga 

Page 7: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 7/37

1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 86,779.00 103,950.00

Bahan

Papan Kayu Borneo 0.0196 m3 2,035,000.00 39,886.00

Paku Biasa½" - 1" 0.030 Kg 34,100.00 1,023.00

Lem Kayu 0.300 Lt 9,900.00 2,970.00

Plywood 4 mm 1.000 lbr  42,900.00 42,900.00

Tenaga

Perkerja 0.600 Oh 27,500.00 16,500 

Tukang Kayu 2.000 Oh 38,500.00 77,000 

Kepala Tukang  0.200 Oh 44,000.00 8,800 

Mandor  0.030 Oh 55,000.00 1,650 

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 595,100.00 103,950.00

Bahan

Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

Paku Biasa½" - 1" 0.300 Kg 34,100.00 10,230.00

Lem Kayu 0.300 Lt 9,900.00 2,970.00

Plywood 4 mm 1.000 lbr  42,900.00 42,900.00

Tenaga

Perkerja 0.600 Oh 27,500.00 16,500 Tukang Kayu 2.000 Oh 38,500.00 77,000 

Kepala Tukang  0.200 Oh 44,000.00 8,800 

Mandor  0.030 Oh 55,000.00 1,650 

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 595,100.00 103,950.00

Bahan

Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

Paku Biasa½" - 1" 0.300 Kg 34,100.00 10,230.00

Lem Kayu 0.300 Lt 9,900.00 2,970.00

Plywood 4 mm 1.000 lbr  42,900.00 42,900.00Tenaga

Perkerja 0.600 Oh 27,500.00 16,500 

Tukang Kayu 2.000 Oh 38,500.00 77,000 

Kepala Tukang  0.200 Oh 44,000.00 8,800 

Mandor  0.030 Oh 55,000.00 1,650 

1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 633,050.00 131,450.00

Bahan

Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00

Paku Biasa½

" - 1" 0.300 Kg 34,100.00 10,230.00Lem Kayu 0.800 Lt 9,900.00 7,920.00

Plywood 4 mm 1.000 lbr  42,900.00 42,900.00

Formika 4' x 3' 0.500 lbr  66,000.00 33,000.00

Tenaga

Perkerja 0.800 Oh 27,500.00 22,000 

Tukang Kayu 2.500 Oh 38,500.00 96,250  

Besi Strip 15 000 Kg 11 550 00 173 250 00

Page 8: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 8/37

Besi Strip 15.000 Kg 11,550.00 173,250.00

Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

Tenaga

Perkerja 4.000 Oh 27,500.00 110,000 

Tukang Kayu 12.000 Oh 38,500.00 462,000 

Kepala Tukang  1.200 Oh 44,000.00 52,800 

Mandor  0.200 Oh 55,000.00 11,000 

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 1,834,030.00 635,800.00

Bahan

Balok Kayu Kruing 1.100 m3 1,485,000.00 1,633,500.00Besi Strip 15.000 Kg 11,550.00 173,250.00

Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00

Tenaga

Perkerja 4.000 Oh 27,500.00 110,000 

Tukang Kayu 12.000 Oh 38,500.00 462,000 

Kepala Tukang  1.200 Oh 44,000.00 52,800 

Mandor  0.200 Oh 55,000.00 11,000 

1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 24,915.00 7,315.00

BahanBalok Kayu Kamper  0.012 m3 1,650,000.00 19,800.00

Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.005 Oh 55,000.00 275 

1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 24,315.00 7,315.00

BahanBalok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00

Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.005 Oh 55,000.00 275 

1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 390,115.00 7,315.00

Bahan

Balok Kayu Jati 0.014 m3 27,500,000.00 385,000.00

Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440  

Bahan

Page 9: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 9/37

Bahan

Balok Kayu Kamper  0.023 m3 1,650,000.00 37,950.00

Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.200 Oh 27,500.00 5,500 

Tukang Kayu 0.300 Oh 38,500.00 11,550 

Kepala Tukang  0.030 Oh 44,000.00 1,320 

Mandor  0.010 Oh 55,000.00 550 

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 41,915.00 18,920.00

BahanBalok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00

Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.200 Oh 27,500.00 5,500 

Tukang Kayu 0.300 Oh 38,500.00 11,550 

Kepala Tukang  0.030 Oh 44,000.00 1,320 

Mandor  0.010 Oh 55,000.00 550 

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 749,320.00 22,577.50

BahanBalok Kayu Jati 0.027 m3 27,500,000.00 742,500.00

Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Kayu 0.350 Oh 38,500.00 13,475 

Kepala Tukang  0.035 Oh 44,000.00 1,540 

Mandor  0.0125 Oh 55,000.00 688 

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 51,370.00 22,577.50

BahanBalok Kayu Kamper  0.027 m3 1,650,000.00 44,550.00

Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Kayu 0.350 Oh 38,500.00 13,475 

Kepala Tukang  0.035 Oh 44,000.00 1,540 

Mandor  0.0125 Oh 55,000.00 688 

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 50,020.00 22,577.50

Bahan

Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00

Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Kayu 0.350 Oh 38,500.00 13,475 

Kepala Tukang  0.035 Oh 44,000.00 1,540  

Page 10: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 10/37

1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 49,830.00 27,555.00

Bahan

Balok Kayu Kamper  0.0195 m3 1,650,000.00 32,175.00

Papan Kayu Kamper  0.007 m3 2,035,000.00 14,245.00

Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

Tenaga

Perkerja 0.150 Oh 27,500.00 4,125 

Tukang Kayu 0.450 Oh 38,500.00 17,325 

Kepala Tukang  0.045 Oh 44,000.00 1,980 

Mandor  0.075 Oh 55,000.00 4,125 

1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 49,830.00 27,555.00

Bahan

Balok Kayu Kamper  0.0195 m3 1,650,000.00 32,175.00

Papan Kayu Kamper  0.007 m3 2,035,000.00 14,245.00

Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

Tenaga

Perkerja 0.150 Oh 27,500.00 4,125 

Tukang Kayu 0.450 Oh 38,500.00 17,325 

Kepala Tukang  0.045 Oh 44,000.00 1,980 Mandor  0.075 Oh 55,000.00 4,125 

1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 98,274.00 31,790.00

Bahan

Balok Kayu Kamper  0.0195 m3 1,650,000.00 32,175.00

Papan Kayu Kamper  0.007 m3 2,035,000.00 14,245.00

Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

Lem Kayu 0.560 lt 9,900.00 5,544.00

Plywood 4 mm 1.000 lbr  42,900.00 42,900.00

TenagaPerkerja 0.200 Oh 27,500.00 5,500 

Tukang Kayu 0.600 Oh 38,500.00 23,100 

Kepala Tukang  0.060 Oh 44,000.00 2,640 

Mandor  0.010 Oh 55,000.00 550 

1m² Pasang Dinding Lambriziring dari papan Kayu jati 201,025.00 95,370.00

Bahan

Papan Kayu Jati 0.007 m3 27,500,000.00 192,500.00

Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00

Paku Skrup 3.5"  0.150 Kg 34,100.00 5,115.00

Tenaga

Perkerja 0.600 Oh 27,500.00 16,500 

Tukang Kayu 1.800 Oh 38,500.00 69,300 

Kepala Tukang  0.180 Oh 44,000.00 7,920 

Mandor  0.030 Oh 55,000.00 1,650 

 

Perkerja 1.650 Oh 27,500.00 45,375 

Page 11: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 11/37

Tukang Batu 0.250 Oh 35,750.00 8,938 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.080 Oh 55,000.00 4,400 

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr 631,500.00 59,812.50

Bahan

Semen Por tland 357.000 Kg 1,100.00 392,700.00

Pasir Beton 0.420 m3 215,000.00 90,300.00

Koral Beton 0.540 m3 275,000.00 148,500.00

TenagaPerkerja 1.650 Oh 27,500.00 45,375 

Tukang Batu 0.250 Oh 35,750.00 8,938 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.080 Oh 55,000.00 4,400 

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr 740,150.00 59,812.50

Bahan

Semen Por tland 386.000 Kg 1,100.00 424,600.00

Pasir Beton 0.470 m3 215,000.00 101,050.00

Koral Beton 0.780 m3 275,000.00 214,500.00Tenaga

Perkerja 1.650 Oh 27,500.00 45,375 

Tukang Batu 0.250 Oh 35,750.00 8,938 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.080 Oh 55,000.00 4,400 

1 m³ Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr 809,950.00 59,812.50

Bahan

Semen Por tland 479.000 Kg 1,100.00 526,900.00

Pasir Beton 0.370 m3 215,000.00 79,550.00Koral Beton 0.740 m3 275,000.00 203,500.00

Tenaga

Perkerja 1.650 Oh 27,500.00 45,375 

Tukang Batu 0.250 Oh 35,750.00 8,938 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.080 Oh 55,000.00 4,400 

1 m³ Membuat Tiang Pancang Prestressed Beton 828,892.00 59,812.50

Bahan

Semen Por tland 479.000 Kg 1,100.00 526,900.00

Pasir Beton 0.370 m3 215,000.00 79,550.00

Koral Beton 0.740 m3 275,000.00 203,500.00

Rapidrant 2.460 gln 7,700.00 18,942.00

Tenaga

Perkerja 1.650 Oh 27,500.00 45,375 

Tukang Batu 0.250 Oh 35,750.00 8,938  

Tukang Batu 0.350 Oh 35,750.00 12,513 

Page 12: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 12/37

Mandor  0.003 Oh 55,000.00 165 

1 m' Memasang PVC Waterstop lebar 250 mm 47,355.00 27,802.50

Bahan

Waterstop lebar 250 mm 1.050 m' 45,100.00 47,355.00

Tenaga

Perkerja 0.550 Oh 27,500.00 15,125 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Mandor  0.003 Oh 55,000.00 165 

1 m' Memasang PVC Waterstop lebar 300 mm 53,130.00 27,802.50

Bahan

Waterstop lebar 300 mm 1.050 m' 50,600.00 53,130.00

Tenaga

Perkerja 0.550 Oh 27,500.00 15,125 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Mandor  0.003 Oh 55,000.00 165 

1 m' Memasang PVC Waterstop lebar 320 mm 75,075.00 27,802.50

BahanWaterstop lebar 320 mm 1.050 m' 71,500.00 75,075.00

Tenaga

Perkerja 0.550 Oh 27,500.00 15,125 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Mandor  0.003 Oh 55,000.00 165 

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 17,646.75 490.05

Bahan

Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00

Kawat Beton 0.015 Kg 21,450.00 321.75Tenaga

Perkerja 0.007 Oh 27,500.00 193 

Tukang Besi 0.007 Oh 35,750.00 250 

Kepala Tukang  0.0007 Oh 44,000.00 31 

Mandor  0.0003 Oh 55,000.00 17 

1 Kg Kabel Presstressed Polos / Strands 17,539.50 354.75

Bahan

Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00

Kawat Beton 0.010 Kg 21,450.00 214.50

Tenaga

Perkerja 0.005 Oh 27,500.00 138 

Tukang Besi 0.005 Oh 35,750.00 179 

Kepala Tukang  0.0005 Oh 44,000.00 22 

Mandor  0.0003 Oh 55,000.00 17 

 

Tukang Batu 0.330 Oh 35,750.00 11,798 

Page 13: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 13/37

Kepala Tukang  0.033 Oh 44,000.00 1,452 

Mandor  0.006 Oh 55,000.00 330 

1 m2 Pasang Bekisting untuk Dinding 449,755.00 23,287.00

Bahan

Kayu Terentang  0.040 m3 1,540,000.00 61,600.00

Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

Minyak Bekisting 0.200 Lt 4,950.00 990.00

Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

Plywood 9 mm 0.350 lbr  49,500.00 17,325.00Dolken Kayu GalamØ 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00

Formtie / penjaga jarak bekisting 4.000 bh 71,500.00 286,000.00

Tenaga

Perkerja 0.320 Oh 27,500.00 8,800 

Tukang Kayu 0.330 Oh 38,500.00 12,705 

Kepala Tukang  0.033 Oh 44,000.00 1,452 

Mandor  0.006 Oh 55,000.00 330 

1 m2 Pasang Bekisting untuk Tangga 117,307.50 23,287.00

BahanKayu Terentang  0.030 m3 1,540,000.00 46,200.00

Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00

Minyak Bekisting 0.150 Lt 4,950.00 742.50

Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00

Plywood 9 mm 0.350 lbr  49,500.00 17,325.00

Dolken Kayu GalamØ 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00

Tenaga

Perkerja 0.320 Oh 27,500.00 8,800 

Tukang Kayu 0.330 Oh 38,500.00 12,705 

KepalaT

ukang  0.033 Oh 44,000.00 1,452 Mandor  0.006 Oh 55,000.00 330 

1 m³ Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting ) 3,490,992.50 217,195.00

Bahan

Kayu Terentang  0.200 m3 1,540,000.00 308,000.00

Paku Biasa 2" - 5" 1.500 Kg 34,100.00 51,150.00

Minyak Bekisting 0.400 Lt 4,950.00 1,980.00

Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00

Kawat Beton 2.250 Kg 21,450.00 48,262.50

Semen Por tland 323.000 Kg 1,100.00 355,300.00

Pasir Beton 0.520 m3 215,000.00 111,800.00

Koral Beton 0.780 m3 275,000.00 214,500.00

Tenaga

Perkerja 3.900 Oh 27,500.00 107,250 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Tukang Kayu 1.040 Oh 38,500.00 40,040  

Pasir Beton 0.520 m3 215,000.00 111,800.00

K l B t 0 780 3 275 000 00 214 500 00

Page 14: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 14/37

Koral Beton 0.780 m3 275,000.00 214,500.00

Kayu Balok Borneo 0.160 m3 1,815,000.00 290,400.00

Plywood 9 mm 2.800 lbr  49,500.00 138,600.00

DolkenØ 8 / 4 m 24.000 btg 8,800.00 211,200.00

Tenaga

Perkerja 5.600 Oh 27,500.00 154,000 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Tukang Kayu 2.640 Oh 38,500.00 101,640 

Tukang Besi 1.050 Oh 35,750.00 37,538 

Kepala Tukang  0.400 Oh 44,000.00 17,600 Mandor  0.193 Oh 55,000.00 10,615 

1 m³ Membuat Tangga Beton Bertulang ( 200 Kg + bekisting ) 4,876,715.00 334,042.50

Bahan

Kayu Terentang  0.250 m3 1,540,000.00 385,000.00

Paku Biasa 2" - 5" 3.000 Kg 34,100.00 102,300.00

Minyak Bekisting 1.200 Lt 4,950.00 5,940.00

Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00

Kawat Beton 3.000 Kg 21,450.00 64,350.00

Semen Por tland 323.000 Kg 1,100.00 355,300.00Pasir Beton 0.520 m3 215,000.00 111,800.00

Koral Beton 0.780 m3 275,000.00 214,500.00

Kayu Balok Borneo 0.105 m3 1,815,000.00 190,575.00

Plywood 9 mm 2.500 lbr  49,500.00 123,750.00

DolkenØ 8 / 4 m 14.000 btg 8,800.00 123,200.00

Tenaga

Perkerja 5.600 Oh 27,500.00 154,000 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Tukang Kayu 2.300 Oh 38,500.00 88,550 

Tukang Besi 1.400 Oh 35,750.00 50,050 Kepala Tukang  0.405 Oh 44,000.00 17,820 

Mandor  0.202 Oh 55,000.00 11,110 

1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 69,238.50 4,279.00

Bahan

Kayu Terentang  0.002 m3 1,540,000.00 3,080.00

Paku Biasa 2" - 5" 0.010 Kg 34,100.00 341.00

Besi Beton Polos 3.000 Kg 16,000.00 48,000.00

Kawat Beton 0.450 Kg 21,450.00 9,652.50

Semen Por tland 4.000 Kg 1,100.00 4,400.00

Pasir Beton 0.006 m3 215,000.00 1,290.00

Koral Beton 0.009 m3 275,000.00 2,475.00

Tenaga

Perkerja 0.060 Oh 27,500.00 1,650 

Tukang Batu 0.020 Oh 35,750.00 715 

Tukang Kayu 0.020 Oh 38,500.00 770  

Bahan

Asbes Gelombang 0 500 lbr 19 800 00 9 900 00

Page 15: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 15/37

 Asbes Gelombang 0.500 lbr  19,800.00 9,900.00

Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

Tenaga

Perkerja 0.140 Oh 27,500.00 3,850 

Tukang Kayu 0.075 Oh 38,500.00 2,888 

Kepala Tukang  0.008 Oh 44,000.00 352 

Mandor  0.008 Oh 55,000.00 440 

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 15,972.00 7,529.50

Bahan Asbes Gelombang 0.600 lbr  19,800.00 11,880.00

Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

Tenaga

Perkerja 0.140 Oh 27,500.00 3,850 

Tukang Kayu 0.075 Oh 38,500.00 2,888 

Kepala Tukang  0.008 Oh 44,000.00 352 

Mandor  0.008 Oh 55,000.00 440 

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 15,972.00 7,238.00

Bahan Asbes Gelombang 0.600 lbr  19,800.00 11,880.00

Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

Tenaga

Perkerja 0.140 Oh 27,500.00 3,850 

Tukang Kayu 0.070 Oh 38,500.00 2,695 

Kepala Tukang  0.007 Oh 44,000.00 308 

Mandor  0.007 Oh 55,000.00 385 

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 18,942.00 7,238.00

Bahan Asbes Gelombang 0.750 lbr  19,800.00 14,850.00

Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

Tenaga

Perkerja 0.140 Oh 27,500.00 3,850 

Tukang Kayu 0.070 Oh 38,500.00 2,695 

Kepala Tukang  0.007 Oh 44,000.00 308 

Mandor  0.007 Oh 55,000.00 385 

1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 11,022.00 7,238.00

Bahan

 Asbes Gelombang 0.350 lbr  19,800.00 6,930.00

Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00

Tenaga

Perkerja 0.140 Oh 27,500.00 3,850 

Tukang Kayu 0.070 Oh 38,500.00 2,695 

Kepala Tukang  0.007 Oh 44,000.00 308  

Bahan

Asbes Gelombang 2 400 lbr 19 800 00 47 520 00

Page 16: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 16/37

 Asbes Gelombang 2.400 lbr  19,800.00 47,520.00

Paku Pancing 60 x 230 6.000 Kg 34,100.00 204,600.00

Tenaga

Perkerja 0.084 Oh 27,500.00 2,310 

Tukang Kayu 0.125 Oh 38,500.00 4,813 

Kepala Tukang  0.013 Oh 44,000.00 572 

Mandor  0.004 Oh 55,000.00 220 

1m' Pasang Nok Stel Gelombang 0.92m 252,120.00 7,914.50

Bahan Asbes Gelombang 2.400 lbr  19,800.00 47,520.00

Paku Skrup 3.5"  6.000 bh 34,100.00 204,600.00

Tenaga

Perkerja 0.084 Oh 27,500.00 2,310 

Tukang Kayu 0.125 Oh 38,500.00 4,813 

Kepala Tukang  0.013 Oh 44,000.00 572 

Mandor  0.004 Oh 55,000.00 220 

1m' Pasang Nok Stel Gelombang 1.05m 246,180.00 7,914.50

Bahan Asbes Gelombang 2.100 lbr  19,800.00 41,580.00

Paku Skrup 3.5"  6.000 bh 34,100.00 204,600.00

Tenaga

Perkerja 0.084 Oh 27,500.00 2,310 

Tukang Kayu 0.125 Oh 38,500.00 4,813 

Kepala Tukang  0.013 Oh 44,000.00 572 

Mandor  0.004 Oh 55,000.00 220 

1m' Pasang Nok Stel Gelombang 1.08m 245,190.00 7,914.50

Bahan

 Asbes Gelombang 2.050 lbr  19,800.00 40,590.00

Paku Skrup 3.5"  6.000 bh 34,100.00 204,600.00

Tenaga

Perkerja 0.084 Oh 27,500.00 2,310 

Tukang Kayu 0.125 Oh 38,500.00 4,813 

Kepala Tukang  0.013 Oh 44,000.00 572 

Mandor  0.004 Oh 55,000.00 220 

1m' Pasang Nok Paten 0.92m 208,560.00 7,914.50

Bahan

Nok Paten 1.200 lbr 3,300.00 3,960.00

Paku Skrup 3.5"  6.000 bh 34,100.00 204,600.00

Tenaga

Perkerja 0.084 Oh 27,500.00 2,310 

Tukang Kayu 0.125 Oh 38,500.00 4,813 

Kepala Tukang  0.013 Oh 44,000.00 572  

Tukang Kayu 0.200 Oh 38,500.00 7,700 Kepala Tukang 0 020 Oh 44 000 00 880

Page 17: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 17/37

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.020 Oh 55,000.00 1,100 

1m' Pasang Nok Genteng Aspal 29,305.00 14,492.50

Bahan

Genteng Aspal 2.000 lbr  11,000.00 22,000.00

Paku Biasa½" - 1" 0.050 Kg 34,100.00 1,705.00

Balok Kayu Borneo 0.0035 Kg 1,600,000.00 5,600.00

Tenaga

Perkerja 0.125 Oh 27,500.00 3,438 Tukang Kayu 0.250 Oh 38,500.00 9,625 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.006 Oh 55,000.00 330 

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00

Bahan

Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00

Paku Biasa½" - 1" 0.050 Kg 34,100.00 1,705.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.015 Oh 44,000.00 660 

Mandor  0.013 Oh 55,000.00 715 

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00

Bahan

Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00

Paku Biasa½" - 1" 0.050 Kg 34,100.00 1,705.00

Tenaga

Perkerja 0.250 Oh 27,500.00 6,875 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.015 Oh 44,000.00 660 

Mandor  0.013 Oh 55,000.00 715 

1m' Pasang Nok Sirap 27,291.00 14,492.50

Bahan

Seng Plat 3" x 6" BJLS 28 0.400 Lbr 38,500.00 15,400.00

Paku Biasa½" - 1" 0.060 Kg 34,100.00 2,046.00

Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00

Papan Kayu Borneo tebal 3cm 0.004 m3 2,035,000.00 8,140.00

Tenaga

Perkerja 0.125 Oh 27,500.00 3,438 

Tukang Kayu 0.250 Oh 38,500.00 9,625 

Kepala Tukang  0.025 Oh 44,000.00 1,100 

Mandor  0.006 Oh 55,000.00 330 

 

Paku 0.050 Kg 34,100.00 1,705.00Tenaga

Page 18: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 18/37

g

Perkerja 0.060 Oh 27,500.00 1,650 

Tukang Kayu 0.120 Oh 38,500.00 4,620 

Kepala Tukang  0.012 Oh 44,000.00 528 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Langit - langit Akustik ( 30 x 60 )cm 314,325.00 6,105.00

Bahan

 Akustik 30 x 60 cm 5.800 lbr  53,900.00 312,620.00

Paku 0.050 Kg 34,100.00 1,705.00Tenaga

Perkerja 0.060 Oh 27,500.00 1,650 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Langit - langit Akustik ( 60 x 120 )cm 100,705.00 6,105.00

Bahan

 Akustik Arm Strong Ukuran 30 x 120 cm 1.500 lbr  66,000.00 99,000.00

Paku 0.050 Kg 34,100.00 1,705.00Tenaga

Perkerja 0.060 Oh 27,500.00 1,650 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm 16,467.00 6,407.50

Bahan

Plywood 4 mm 0.360 lbr  42,900.00 15,444.00

Paku 0.030 Kg 34,100.00 1,023.00

Tenaga

Perkerja 0.070 Oh 27,500.00 1,925 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0035 Oh 55,000.00 193 

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm 16,467.00 6,407.50

Bahan

Plywood 4 mm 0.360 lbr  42,900.00 15,444.00

Paku 0.030 Kg 34,100.00 1,023.00

Tenaga

Perkerja 0.070 Oh 27,500.00 1,925 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0035 Oh 55,000.00 193 

 

1 m² Langit - langit Akustik 60 x 120 cm + rangka Alluminium 379,885.00 25,987.50Bahan

Page 19: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 19/37

Profil Alluminium " T " 3.600 m' 71,500.00 257,400.00

Kawat seng polos 0.150 Kg 20,900.00 3,135.00

Ramset / Dinabolt 1.000 bh 12,100.00 12,100.00

 Akustik Armstrom 60 x 120cm 1.500 lbr 71,500.00 107,250.00

Tenaga

Perkerja 0.150 Oh 27,500.00 4,125 

Tukang Kayu 0.500 Oh 38,500.00 19,250 

Kepala Tukang  0.050 Oh 44,000.00 2,200 

Mandor  0.0075 Oh 55,000.00 413 

1 m² List Langit - langit Kayu Profil 16,071.00 3,685.00

Bahan

List Kayu Profil 1.100 m' 14,300.00 15,730.00

Paku 0.010 Kg 34,100.00 341.00

Tenaga

Perkerja 0.050 Oh 27,500.00 1,375 

Tukang Kayu 0.050 Oh 38,500.00 1,925 

Kepala Tukang  0.005 Oh 44,000.00 220 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Langit - langit Plywood 4 mm + RangkaKayu Borneo 55,577.00 25,327.50

Bahan

Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00

Paku 0.060 Kg 34,100.00 2,046.00

Plywood 4 mm 0.390 lbr  42,900.00 16,731.00

Tenaga

Perkerja 0.270 Oh 27,500.00 7,425 

Tukang Kayu 0.400 Oh 38,500.00 15,400 

Kepala Tukang  0.040 Oh 44,000.00 1,760 

Mandor  0.0135 Oh 55,000.00 743 

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo 43,026.00 19,173.00

Bahan

Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00

Paku 0.060 Kg 34,100.00 2,046.00

 Asbes 1.100 lbr  19,800.00 21,780.00

Tenaga

Perkerja 0.180 Oh 27,500.00 4,950 

Tukang Kayu 0.320 Oh 38,500.00 12,320 

Kepala Tukang  0.032 Oh 44,000.00 1,408 

Mandor  0.0090 Oh 55,000.00 495 

1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo 351,466.00 25,025.00

Bahan

Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00 

Perkerja 1.800 Oh 27,500.00 49,500 Tukang Batu 2.700 Oh 35,750.00 96,525 

Page 20: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 20/37

Kepala Tukang  0.540 Oh 44,000.00 23,760 

Mandor  0.1100 Oh 55,000.00 6,050 

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ 420,284.00 301,950.00

Bahan

Bata merah kelas I 0.400 m3 605.00 242.00

Semen Por tland 120.000 Kg 1,100.00 132,000.00

Pasir Pasang  0.300 m3 215,000.00 64,500.00

Porselen ( 11 x 11 ) cm 360.000 bh 598.95 215,622.00Semen Nat 6.000 Kg 1,320.00 7,920.00

Tenaga

Perkerja 6.000 Oh 27,500.00 165,000 

Tukang Batu 3.000 Oh 35,750.00 107,250 

Kepala Tukang  0.300 Oh 44,000.00 13,200 

Mandor  0.3000 Oh 55,000.00 16,500 

Memasang 1 buah Badkip Porselen 858,000.00 #V ALUE!

Bahan

Badkip 1.000 bh 715,000.00 715,000.00Perlengkapan 143,000.00 143,000.00

Tenaga

Perkerja - Oh 27,500.00 #V ALUE!

Tukang Batu 0.075 Oh 35,750.00 2,681 

Kepala Tukang  0.750 Oh 44,000.00 33,000 

Mandor  0.2500 Oh 55,000.00 13,750 

Memasang 1 buah Bak Fiberglass volume 1 m³ air  221,760.00 332,475.00

Bahan

Bak Fiber glass 1.000 bh 198,000.00 198,000.00

Perlengkapan 23,760.00

Tenaga

Perkerja 3.000 Oh 27,500.00 82,500 

Tukang Batu 4.500 Oh 35,750.00 160,875 

Kepala Tukang  0.900 Oh 44,000.00 39,600 

Mandor  0.9000 Oh 55,000.00 49,500 

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa TanahØ15 cm 154,111.00 2,992.00

Bahan

Pipa Tanah 1.600 bh 93,500.00 149,600.00

Semen Por tland 0.680 Kg 1,100.00 748.00

Pasir Pasang  0.013 m3 215,000.00 2,795.00

Pasir Urug 0.011 m3 88,000.00 968.00

Tenaga

Perkerja 0.060 Oh 27,500.00 1,650 

20% har ga Badkip

12% Har ga Bak

 

Mandor  0.0270 Oh 55,000.00 1,485 

Page 21: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 21/37

Memasang 1 m' Pipa GalvanisØ ¾" 201,500.00 6,583.50

Bahan

Pipa Galvanis 1.200 m' 130,000.00 156,000.00

Perlengkapan 45,500.00 45,500.00

Tenaga

Perkerja 0.054 Oh 27,500.00 1,485 

Tukang Batu 0.090 Oh 35,750.00 3,218 

Kepala Tukang  0.0090 Oh 44,000.00 396 

Mandor  0.0270 Oh 55,000.00 1,485 

Memasang 1 m' Pipa GalvanisØ 1" 201,500.00 6,583.50

Bahan

Pipa Galvanis 1.200 m' 130,000.00 156,000.00

Perlengkapan 45,500.00 45,500.00

Tenaga

Perkerja 0.054 Oh 27,500.00 1,485 

Tukang Batu 0.090 Oh 35,750.00 3,218 

Kepala Tukang  0.0090 Oh 44,000.00 396 

Mandor  0.0270 Oh 55,000.00 1,485 

Memasang 1 m' Pipa GalvanisØ 1½" 201,500.00 10,494.00

Bahan

Pipa Galvanis 1.200 m' 130,000.00 156,000.00

Perlengkapan 45,500.00 45,500.00

Tenaga

Perkerja 0.108 Oh 27,500.00 2,970 

Tukang Batu 0.180 Oh 35,750.00 6,435 

Kepala Tukang  0.0180 Oh 44,000.00 792 

Mandor  0.0054 Oh 55,000.00 297 

Memasang 1 m' Pipa GalvanisØ 3" #V ALUE! 10,494.00

Bahan

Pipa Galvanis 1.200 m' 130,000.00 156,000.00

Perlengkapan 45,500.00 #V ALUE!

Tenaga

Perkerja 0.108 Oh 27,500.00 2,970 

Tukang Batu 0.180 Oh 35,750.00 6,435 

Kepala Tukang  0.0180 Oh 44,000.00 792 

Mandor  0.0054 Oh 55,000.00 297 

Memasang 1 m' Pipa GalvanisØ 4" 28,416.67 13,120.25

Bahan

Pipa Galvanis D 4" 1.200 m' 18,333.33 22,000.00

Perlengkapan 6,416.67 6,416.67

Tenaga

35% Har ga Pipa

35% Har ga Pipa

35% Har ga Pipa

35% Har ga Pipa

35% Har ga Pipa

 

Mandor  0.0015 Oh 55,000.00 83 

M 1 bh B k C i Pi i T 489 250 00 21 587 50

Page 22: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 22/37

Memasang 1 bh Bak Cuci Piring Teraso 489,250.00 21,587.50

Bahan

Bak cuci Teraso 1.000 bh 385,000.00 385,000.00

Water Drain + Asesories 1.000 set 71,500.00 71,500.00

Semen Por tland 20.000 Kg 1,100.00 22,000.00

Pasir Pasang  0.050 m3 215,000.00 10,750.00

Tenaga

Perkerja 0.050 Oh 27,500.00 1,375 

Tukang Batu 0.500 Oh 35,750.00 17,875 Kepala Tukang  0.0500 Oh 44,000.00 2,200 

Mandor  0.0025 Oh 55,000.00 138 

Memasang 1 bh KranØ ¾" atau½" 33,123.75 4,565.00

Bahan

Kran Air  1.000 bh 33,000.00 33,000.00

Seal tape 0.025 bh 4,950.00 123.75

Tenaga

Perkerja 0.010 Oh 27,500.00 275 

Tukang Batu 0.100 Oh 35,750.00 3,575 Kepala Tukang  0.0100 Oh 44,000.00 440 

Mandor  0.0050 Oh 55,000.00 275 

Memasang 1 bh Floor Drain 33,000.00 4,565.00

Bahan

Kran Air  1.000 bh 33,000.00 33,000.00

Tenaga

Perkerja 0.010 Oh 27,500.00 275 

Tukang Batu 0.100 Oh 35,750.00 3,575 

Kepala Tukang  0.0100 Oh 44,000.00 440 

Mandor  0.0050 Oh 55,000.00 275 

VII PEKERJAAN BESI DAN ALLUMINIUM

1 Kg Pasang Rangka Atap Baja 23,100.00 2,590.50

Bahan

Besi Profil WF 1.100 Kg 19,800.00 21,780.00

Meni Besi 0.080 Kg 16,500.00 1,320.00

Tenaga

Perkerja 0.006 Oh 27,500.00 165 

Tukang Besi 0.060 Oh 35,750.00 2,145 

Kepala Tukang  0.0060 Oh 44,000.00 264 Mandor  0.0003 Oh 55,000.00 17 

1 m² Pasang Pintu Besi Baja 495,000.00 47,520.00

Bahan

Pintu Besi Baja 1.000 m2 495,000.00 495,000.00 

Kepala Tukang  0.012 Oh 44,000.00 528 Mandor  0.0006 Oh 55,000.00 33 

Page 23: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 23/37

1 m² Pasang Kawat Harmonika 197,945.00 7,067.50

Bahan

Kawat Harmonika 1.100 m2 176,000.00 193,600.00

Paku Biasa½" - 1" 0.020 Kg 34,100.00 682.00

Papan Kayu Kamper  0.0018 m3 2,035,000.00 3,663.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0005 Oh 55,000.00 28 

1 m² Pasang Kawat Nyamuk 52,745.00 7,067.50

Bahan

Kawat Nyamuk 1.100 m2 44,000.00 48,400.00

Paku Biasa½" - 1" 0.020 Kg 34,100.00 682.00

Papan Kayu Kamper  0.0018 m3 2,035,000.00 3,663.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0005 Oh 55,000.00 28 

1 m² Pasang Kawat Kassa 76,945.00 7,067.50

Bahan

Kawat Kassa 1.100 m2 66,000.00 72,600.00

Paku Biasa½" - 1" 0.020 Kg 34,100.00 682.00

Papan Kayu Kamper  0.0018 m3 2,035,000.00 3,663.00

Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0005 Oh 55,000.00 28 

1 m² Pasang Kawat Burung 46,695.00 7,067.50

Bahan

Kawat Burung 1.100 m2 38,500.00 42,350.00

Paku Biasa½" - 1" 0.020 Kg 34,100.00 682.00

Papan Kayu Kamper  0.0018 m3 2,035,000.00 3,663.00Tenaga

Perkerja 0.100 Oh 27,500.00 2,750 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.0005 Oh 55,000.00 28  

Tukang Kayu 0.500 Oh 38,500.00 19,250 Kepala Tukang  0.005 Oh 44,000.00 220 

Mandor 0 00025 Oh 55 000 00 14

Page 24: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 24/37

Mandor  0.00025 Oh 55,000.00 14 

1 Buah Pasang Engsel Pintu 30,250.00 6,888.75

Bahan

Engsel Pintu 1.000 Bh 30,250.00 30,250.00

Tenaga

Perkerja 0.015 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.015 Oh 44,000.00 660 Mandor  0.00075 Oh 55,000.00 41 

1 Buah Pasang Engsel Jendela Kupu - kupu 27,500.00 4,592.50

Bahan

Engsel Jendela 1.000 Bh 27,500.00 27,500.00

Tenaga

Perkerja 0.010 Oh 27,500.00 275 

Tukang Kayu 0.100 Oh 38,500.00 3,850 

Kepala Tukang  0.010 Oh 44,000.00 440 

Mandor  0.00050 Oh 55,000.00 28 

1 Buah Pasang Engsel Angin 33,000.00 9,680.00

Bahan

Engsel Angin 1.000 Bh 33,000.00 33,000.00

Tenaga

Perkerja 0.020 Oh 27,500.00 550 

Tukang Kayu 0.200 Oh 38,500.00 7,700 

Kepala Tukang  0.020 Oh 44,000.00 880 

Mandor  0.01000 Oh 55,000.00 550 

1 Buah Pasang Spring Knip 3,850.00 6,888.75

Bahan

Spring Knip 1.000 Bh 3,850.00 3,850.00

Tenaga

Perkerja 0.015 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.015 Oh 44,000.00 660 

Mandor  0.00075 Oh 55,000.00 41 

1 Buah Pasang Kait angin 38,500.00 6,888.75

BahanKait Angin 1.000 Bh 38,500.00 38,500.00

Tenaga

Perkerja 0.015 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.015 Oh 44,000.00 660  

BahanKaca Cermin 1.100 m2 88,000.00 96,800.00

Tenaga

Page 25: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 25/37

Tenaga

Perkerja 0.0150 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.0150 Oh 44,000.00 660 

Mandor  0.00075 Oh 55,000.00 41 

1 Buah Pasang Kaca Cermin tebal 6 mm 96,800.00 6,888.75

Bahan

Kaca Cermin 1.100 m2 88,000.00 96,800.00Tenaga

Perkerja 0.0150 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.0150 Oh 44,000.00 660 

Mandor  0.00075 Oh 55,000.00 41 

1 Buah Pasang Kaca Cermin tebal 8 mm 96,800.00 7,576.25

Bahan

Kaca Cermin 1.100 m2 88,000.00 96,800.00

Tenaga

Perkerja 0.0165 Oh 27,500.00 454 

Tukang Kayu 0.165 Oh 38,500.00 6,353 

Kepala Tukang  0.0165 Oh 44,000.00 726 

Mandor  0.00080 Oh 55,000.00 44 

1 Buah Pasang Kaca Wireglass tebal 5 mm 145,200.00 6,888.75

Bahan

Kaca Wireglass 1.100 m2 132,000.00 145,200.00

Tenaga

Perkerja 0.0150 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.0150 Oh 44,000.00 660 

Mandor  0.00075 Oh 55,000.00 41 

1 Buah Pasang Kaca Patri tebal 5 mm 423,500.00 6,888.75

Bahan

Kaca Patri 1.100 m2 385,000.00 423,500.00

Tenaga

Perkerja 0.0150 Oh 27,500.00 413 

Tukang Kayu 0.150 Oh 38,500.00 5,775 

Kepala Tukang  0.0150 Oh 44,000.00 660 Mandor  0.00075 Oh 55,000.00 41 

VI PEKERJAAN PENUTUP LANTAI DAN DINDING

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm 56,243.30 12,380.50

Bahan 

TenagaPerkerja 0.2600 Oh 27,500.00 7,150 

Tukang Batu 0.125 Oh 35,750.00 4,469

Page 26: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 26/37

g , ,

Kepala Tukang  0.0125 Oh 44,000.00 550 

Mandor  0.0130 Oh 55,000.00 715 

1 m² Pasang Lantai Ubin Granito ukuran 40 x 40 cm 224,464.10 12,402.50

Bahan

Ubin Granito 40 x 40 cm 6.930 bh 29,920.00 207,345.60

Semen Por tland 9.800 Kg 1,100.00 10,780.00

Pasir Pasang  0.0215 m3 215,000.00 4,622.50Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga

Perkerja 0.2500 Oh 27,500.00 6,875 

Tukang Batu 0.120 Oh 35,750.00 4,290 

Kepala Tukang  0.0125 Oh 44,000.00 550 

Mandor  0.0125 Oh 55,000.00 688 

1 m² Pasang Lantai Ubin Granito ukuran 30 x 30 cm 217,374.60 12,883.75

Bahan

Ubin Granito 30 x 30 cm 11.870 bh 16,830.00 199,772.10

Semen Por tland 10.000 Kg 1,100.00 11,000.00

Pasir Pasang  0.0215 m3 215,000.00 4,622.50

Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.2600 Oh 27,500.00 7,150 

Tukang Batu 0.125 Oh 35,750.00 4,469 

Kepala Tukang  0.0125 Oh 44,000.00 550 

Mandor  0.0130 Oh 55,000.00 715 

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm 98,518.50 12,380.50

Bahan

Ubin Teralux Kerang 40 x 40 cm 6.250 bh 13,200.00 82,500.00

Semen Por tland 8.800 Kg 1,100.00 9,680.00

Pasir Pasang  0.0215 m3 215,000.00 4,622.50

Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga

Perkerja 0.2500 Oh 27,500.00 6,875 

Tukang Batu 0.120 Oh 35,750.00 4,290 Kepala Tukang  0.0120 Oh 44,000.00 528 

Mandor  0.0125 Oh 55,000.00 688 

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm 104,774.48 12,380.50

Bahan 

TenagaPerkerja 0.0600 Oh 27,500.00 1,650 

Tukang Batu 0.030 Oh 35,750.00 1,073 

Page 27: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 27/37

g

Kepala Tukang  0.0030 Oh 44,000.00 132 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm 7,030.60 3,019.50

Bahan

Plint Ubin PC Warna 10 x 30 cm 3.330 bh 1,320.00 4,395.60

Semen Por tland 1.650 Kg 1,100.00 1,815.00

Pasir Pasang  0.0032 m3 215,000.00 688.00Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga

Perkerja 0.0600 Oh 27,500.00 1,650 

Tukang Batu 0.030 Oh 35,750.00 1,073 

Kepala Tukang  0.0030 Oh 44,000.00 132 

Mandor  0.0030 Oh 55,000.00 165 

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 40 cm 6,761.00 4,026.00

Bahan

Plint Ubin PC Warna 10 x 40 cm 2.650 bh 1,760.00 4,664.00

Semen Por tland 1.200 Kg 1,100.00 1,320.00

Pasir Pasang  0.0030 m3 215,000.00 645.00

Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga

Perkerja 0.0800 Oh 27,500.00 2,200 

Tukang Batu 0.040 Oh 35,750.00 1,430 

Kepala Tukang  0.0040 Oh 44,000.00 176 

Mandor  0.0040 Oh 55,000.00 220 

1 m² Pasang Plint Ubin Teraso ukuran 10 x 30 cm 6,688.95 4,026.00

Bahan

Plint Ubin Teraso 10 x 30 cm 3.530 bh 1,155.00 4,077.15

Semen Por tland 1.560 Kg 1,100.00 1,716.00

Pasir Pasang  0.0030 m3 215,000.00 645.00

Semen Warna 0.1900 Kg 1,320.00 250.80

Tenaga

Perkerja 0.0800 Oh 27,500.00 2,200 

Tukang Batu 0.040 Oh 35,750.00 1,430 Kepala Tukang  0.0040 Oh 44,000.00 176 

Mandor  0.0040 Oh 55,000.00 220 

1 m² Pasang Plint Ubin Teraso ukuran 10 x 40 cm 6,178.00 4,026.00

Bahan 

Pasir Pasang  0.0032 m3 215,000.00 688.00Semen Warna 0.1000 Kg 1,320.00 132.00

Page 28: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 28/37

Tenaga

Perkerja 0.9000 Oh 27,500.00 24,750 

Tukang Batu 0.090 Oh 35,750.00 3,218 

Kepala Tukang  0.0090 Oh 44,000.00 396 

Mandor  0.0045 Oh 55,000.00 248 

1 m² Pasang Teraso Cor ditempat 118.80 28,611.00

BahanBahan Teraso Cor  0.0036 m3 33,000.00 118.80

Tenaga

Perkerja 0.9000 Oh 27,500.00 24,750 

Tukang Batu 0.090 Oh 35,750.00 3,218 

Kepala Tukang  0.0090 Oh 44,000.00 396 

Mandor  0.0045 Oh 55,000.00 248 

1 m² Pasang Teralux Cor ditempat, tebal 3 cm 118.80 28,611.00

Bahan

Bahan Teraso Cor  0.0036 m3 33,000.00 118.80

Tenaga

Perkerja 0.9000 Oh 27,500.00 24,750 

Tukang Batu 0.090 Oh 35,750.00 3,218 

Kepala Tukang  0.0090 Oh 44,000.00 396 

Mandor  0.0045 Oh 55,000.00 248 

1 m² Pasang Ubin Tahan Asam 178,970.20 14,190.00

Bahan

Ubin Tahan Asam 1.0500 m2 143,000.00 150,150.00

Semen Tanam Asam 14.1400 Kg 1,430.00 20,220.20

Pasir Pasang  0.0400 m3 215,000.00 8,600.00

Tenaga

Perkerja 0.2700 Oh 27,500.00 7,425 

Tukang Batu 0.150 Oh 35,750.00 5,363 

Kepala Tukang  0.0150 Oh 44,000.00 660 

Mandor  0.0135 Oh 55,000.00 743 

1 m² Pasang Lantai Keramik Artistik 10 x 20 cm 32,108.00 32,752.50Bahan

Ubin Keramik Ar tistik 10 x 20 cm 5.0000 bh 1,716.00 8,580.00

Semen Por tland 11.3800 Kg 1,100.00 12,518.00

Pasir Pasang  0.0420 m3 215,000.00 9,030.00

Semen Warna 1.5000 Kg 1,320.00 1,980.00 

Tukang Batu 0.350 Oh 35,750.00 12,513 Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0300 Oh 55,000.00 1,650 

Page 29: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 29/37

1 m² Pasang Lantai Keramik 25 x 25 cm 73,028.00 32,752.50

Bahan

Ubin Keramik 25 x 25 cm 16.000 bh 3,093.75 49,500.00

Semen Por tland 11.380 Kg 1,100.00 12,518.00

Pasir Pasang  0.042 m3 215,000.00 9,030.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Lantai Keramik 15 x 20 cm 75,503.00 32,752.50

Bahan

Ubin Keramik 15 x 20 cm 35.000 bh 1,485.00 51,975.00

Semen Por tland 11.380 Kg 1,100.00 12,518.00

Pasir Pasang  0.042 m3 215,000.00 9,030.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Lantai Keramik 33 x 33 cm 77,433.50 32,752.50

Bahan

Ubin Keramik 33 x 33 cm 10.000 bh 5,390.55 53,905.50

Semen Por tland 11.380 Kg 1,100.00 12,518.00

Pasir Pasang  0.042 m3 215,000.00 9,030.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Lantai Keramik 33 x 33 cm anti slip 89,412.50 32,752.50

Bahan

Ubin Keramik 33 x 33 cm anti slip 10.000 bh 6,588.45 65,884.50

Semen Por tland 11.380 Kg 1,100.00 12,518.00 

Parquet Jati 1.050 m2 176,000.00 184,800.00Lem Vinyl 0.600 Kg 99,000.00 59,400.00

T

Page 30: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 30/37

Tenaga

Perkerja 0.6500 Oh 27,500.00 17,875 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0325 Oh 55,000.00 1,788 

1 m²

Pasang Dinding Porselen 11 x 11 cm, putih 57,165.00 38,775.00Bahan

Porselen 11 x 11 cm putih 83.000 Bh 495.00 41,085.00

Semen Abu -abu 9.300 Kg 1,100.00 10,230.00

Pasir Pasang  0.018 m3 215,000.00 3,870.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.500 Oh 35,750.00 17,875 

Kepala Tukang  0.0500 Oh 44,000.00 2,200 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Porselen 11 x 11 cm, warna 66,295.00 38,775.00

Bahan

Porselen 11 x 11 cm warna 83.000 Bh 605.00 50,215.00

Semen Abu -abu 9.300 Kg 1,100.00 10,230.00

Pasir Pasang  0.018 m3 215,000.00 3,870.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.500 Oh 35,750.00 17,875 

Kepala Tukang  0.0500 Oh 44,000.00 2,200 Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Porselen 15 x 15 cm, putih 66,198.75 36,217.50

Bahan

Porselen 15 x 15 cm putih 45.000 Bh 1,113.75 50,118.75

Semen Abu -abu 9.300 Kg 1,100.00 10,230.00

Pasir Pasang  0.018 m3 215,000.00 3,870.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6000 Oh 27,500.00 16,500 Tukang Batu 0.450 Oh 35,750.00 16,088 

Kepala Tukang  0.0450 Oh 44,000.00 1,980 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Porselen 15 x 15 cm, warna 77,336.25 36,217.50 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Keramik 10 x 20 cm 208,580.00 23,168.75

B h

Page 31: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 31/37

Bahan

Keramik 10 x 20 cm 50.000 Bh 3,850.00 192,500.00

Semen Abu -abu 9.300 Kg 1,100.00 10,230.00

Pasir Pasang  0.018 m3 215,000.00 3,870.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.6000 Oh 27,500.00 16,500 

Tukang Batu 0.125 Oh 35,750.00 4,469 Kepala Tukang  0.0125 Oh 44,000.00 550 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Marmer  166,899.00 47,822.50

Bahan

Marmer  1.020 M2 143,000.00 145,860.00

Semen Abu -abu 12.440 Kg 1,100.00 13,684.00

Pasir Pasang  0.025 m3 215,000.00 5,375.00

Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga

Perkerja 0.7200 Oh 27,500.00 19,800 

Tukang Batu 0.650 Oh 35,750.00 23,238 

Kepala Tukang  0.0650 Oh 44,000.00 2,860 

Mandor  0.0350 Oh 55,000.00 1,925 

1 m² Pasang Dinding Bata Klinker 5 x 5 x 24 cm 107,059.00 32,752.50

Bahan

Bata Pelapis Klinker  80.000 Bh 1,100.00 88,000.00

Semen Abu -abu 12.440 Kg 1,100.00 13,684.00

Pasir Pasang  0.025 m3 215,000.00 5,375.00Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540 

Mandor  0.0300 Oh 55,000.00 1,650 

1 m² Pasang Dinding Batu Paros 309,200.00 32,752.50

Bahan

Batu Paros 1.050 Bh 275,000.00 288,750.00

Semen Abu -abu 11.750 Kg 1,100.00 12,925.00Pasir Pasang  0.035 m3 215,000.00 7,525.00

Tenaga

Perkerja 0.6200 Oh 27,500.00 17,050 

Tukang Batu 0.350 Oh 35,750.00 12,513 

Kepala Tukang  0.0350 Oh 44,000.00 1,540  

BahanSoda Api 0.050 Kg 7,150.00 357.50

Tenaga

Perkerja 0 1500 Oh 27 500 00 4 125

Page 32: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 32/37

Perkerja 0.1500 Oh 27,500.00 4,125 

Tukang Cat - Oh 33,000.00 #V ALUE!

Kepala Tukang  - Oh 44,000.00 #V ALUE!

Mandor  0.0025 Oh 55,000.00 138 

1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat 192.50 #V ALUE!

Bahan

Sabun 0.050 Kg 3,850.00 192.50Tenaga

Perkerja 0.1500 Oh 27,500.00 4,125 

Tukang Cat - Oh 33,000.00 #V ALUE!

Kepala Tukang  - Oh 44,000.00 #V ALUE!

Mandor  0.0025 Oh 55,000.00 138 

1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 192.50 #V ALUE!

Bahan

Sabun 0.050 Kg 3,850.00 192.50

Tenaga

Perkerja 0.1500 Oh 27,500.00 4,125 

Tukang Cat - Oh 33,000.00 #V ALUE!

Kepala Tukang  - Oh 44,000.00 #V ALUE!

Mandor  0.0025 Oh 55,000.00 138 

1 m² Menyabun Permukaan Tembok Lama 192.50 #V ALUE!

Bahan

Sabun 0.050 Kg 3,850.00 192.50

Tenaga

Perkerja 0.1500 Oh 27,500.00 4,125 

Tukang Cat - Oh 33,000.00 #V ALUE!Kepala Tukang  - Oh 44,000.00 #V ALUE!

Mandor  0.0025 Oh 55,000.00 138 

1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. 577,500.00 159,500.00

Bahan

Pasir Silika 40.000 Kg 13,200.00 528,000.00

BBM 10.000 Ltr  4,950.00 49,500.00

Peralatan

Kompresor , Blasting Pot , Selang Dan Nozzle

TenagaPerkerja 1.6000 Oh 27,500.00 44,000 

Tukang Cat 1.600 Oh 33,000.00 52,800 

Kepala Tukang  0.8000 Oh 44,000.00 35,200 

Mandor  0.5000 Oh 55,000.00 27,500 

sewa / Hr 

 

Dempul 0.050 Kg 23,100.00 1,155.00 Ampelas 0.100 Lbr  5,500.00 550.00

Kuas 0.010 Bh 7,700.00 77.00

Tenaga

Page 33: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 33/37

Tenaga

Perkerja 0.1600 Oh 27,500.00 4,400 

Tukang Cat 0.160 Oh 33,000.00 5,280 

Kepala Tukang  0.0160 Oh 44,000.00 704 

Mandor  0.0025 Oh 55,000.00 138 

1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 6,512.00 3,043.70

Bahan

Plamir  0.100 Kg 19,800.00 1,980.00

Cat Dasar  0.100 Kg 11,000.00 1,100.00

Cat  Tembok vinilex 0.260 Kg 13,200.00 3,432.00

Tenaga

Perkerja 0.0200 Oh 27,500.00 550 

Tukang Cat 0.063 Oh 33,000.00 2,079 

Kepala Tukang  0.0063 Oh 44,000.00 277 

Mandor  0.0025 Oh 55,000.00 138 

1 m² Melabur Tembok dengan Kapur Sirih 5,302.00 4,299.90

Bahan

 Ampelas 0.100 Lbr  5,500.00 550.00

 Alang - alang 0.250 ikat 6,600.00 1,650.00

Perancah Kayu 0.002 m3 1,485,000.00 2,970.00

Kapur Sirih 0.150 Kg 880.00 132.00

Tenaga

Perkerja 0.1500 Oh 27,500.00 4,125 

Tukang Cat 0.001 Oh 33,000.00 33 

Kepala Tukang  0.0001 Oh 44,000.00 4 

Mandor  0.0025 Oh 55,000.00 138 

1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 3,234.00 1,424.50

Bahan

Perancah Kayu 0.002 m3 1,485,000.00 2,970.00

Kapur Sirih 0.300 Kg 880.00 264.00

Tenaga

Perkerja 0.0400 Oh 27,500.00 1,100 

Tukang Cat 0.005 Oh 33,000.00 165 

Kepala Tukang  0.0005 Oh 44,000.00 22 

Mandor  0.0025 Oh 55,000.00 138 

1 m² Pemasangan Wall Paper  47,960.00 7,375.50

Bahan

Wall Paper  1.200 m3 38,500.00 46,200.00

Perekat 0.200 Kg 8,800.00 1,760.00

Tenaga 

NO JENIS UPAH SPESIFIKASI harga real SATUAN

Page 34: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 34/37

Pekerja / knek 55,798.00Rp Oh

Tukang gali 65,734.00Rp Oh

Kepala tukang batu 75,671.00Rp Oh

Tukang batu 65,734.00Rp Oh

Kepala tukang kayu 75,671.00Rp Oh

Tukang kayu 65,734.00Rp Oh

Kepala tukang besi 75,671.00Rp Oh

Tukang besi 65,718.00Rp Oh

Kepala tukang cat 75,671.00Rp Oh

Tukang Cat 65,734.00Rp Oh

Tukang aspalt 65,734.00Rp Oh

Mandor/ pengawas 85,607.00Rp Oh

Instalator  75,671.00Rp Oh

Pembantu instalator  65,718.00Rp Oh

Tukang babat r umput 55,798.00Rp Oh

Tukang taman 65,734.00Rp Oh

Kepala tukang pasang pipa 65,734.00Rp Oh

Tukang pasang pipa 55,798.00Rp OhOperator alat besar  85,607.00Rp Oh

Pembantu operator alat besar  65,734.00Rp Oh

Tukang las 65,734.00Rp Oh

NO JENIS BAHAN SPESIFIKASI harga real SATUAN

 

Flincote / Meni Besi-

Rp KgFloor Hardener Ferrovax -Rp Kg

Formika 4' x 3' -Rp lbr

Page 35: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 35/37

Formika 4 x 3 Rp lbr 

Formtie / penjaga jarak bekisting -Rp bh

Genteng  Aspal -Rp lbr 

Genteng Beton -Rp lbr 

Genteng Bubung Kodok -Rp bh

Genteng Bubung Palentong-

Rp bhGenteng Decra Bond -Rp lbr 

Genteng Kodok -Rp bh

Genteng Metal -Rp lbr 

Genteng Palentong -Rp bh

Genteng Palentong Super  -Rp bh

Genteng Sirap -Rp lbr 

Gypsu

m-

Rp lbr Ijuk -Rp m3

Jendela Besi -Rp m2

Jendela Besi Tahan  Api -Rp m2

Jendela Nako -Rp bh

Kaca Buram -Rp m2

Kaca Cermin -Rp m2

Kaca Patri -Rp m2

Kaca Polos -Rp m2

Kaca Wireglass -Rp m2

Kait  Angin -Rp Bh

Kapur Padam -Rp m3

Kapur Sirih -Rp Kg

Kaso 5 / 7 ( albasiah ) -Rp m3

Kawat Beton -Rp Kg

Kawat Bur ung-

Rp m2

Kawat Duri -Rp Kg

Kawat Harmonika -Rp m2

Kawat Kassa -Rp m2 

Pasir Ur ug-

Rp m3Pasir Ur ug Darat -Rp m3

PC Warna -Rp Kg

Page 36: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 36/37

p g

Pelat  Asbes tebal 4 mm -Rp lbr 

Pelat  Asbes tebal 5 mm -Rp lbr 

Pelitur  -Rp Ltr 

Pelitur Jadi -Rp Ltr 

Pengencer -

Rp Ltr Perancah Kayu -Rp m3

Perekat -Rp Kg

Pintu  Allumunium -Rp m2

Pintu Besi Baja -Rp m2

Pintu gulung besi -Rp m2

Pintu Lipat -Rp m2

Pipa Beton-

Rp bhPipa Galvanis -Rp m'

Pipa Tanah -Rp bh

Plamir  -Rp Kg

Plamuur Tembok -Rp Kg

Plastic  Aerator  -Rp Bh

Plint Keramik  Artistik 10 x 10 cm -Rp bh

Plint Keramik  Artistik 10 x 20 cm -Rp bh

Plint Keramik  Artistik 5 x 20 cm -Rp bh

Plint Ubin PC  Abu - abu 10 x 40 cm -Rp bh

Plint Ubin Granito 10 x 30 cm -Rp bh

Plint Ubin Granito 10 x 40 cm -Rp bh

Plint Ubin PC  Abu - abu 15 x 20 cm -Rp bh

Plint Ubin PC  Abu -abu 10 x 30 cm -Rp bh

Plint Ubin PC Warna 10 x 20 cm -Rp bh

Plint Ubin PC Warna 10 x 30 cm-

Rp bh

Plint Ubin PC Warna 10 x 40 cm -Rp bh

Plint Ubin Teralux Kerang 10 x 30 cm -Rp bh

Plint Ubin Teralux Kerang 10 x 40 cm -Rp bh 

Ubin Teralux Marmer 40 x 40 cm-

Rp bhUbin Teralux Marmer 60 x 60 cm -Rp bh

Ubin Teraso 30 x 30 cm -Rp bh

Page 37: SNI-ANALISA

5/12/2018 SNI-ANALISA - slidepdf.com

http://slidepdf.com/reader/full/sni-analisa 37/37

p

Ubin Teraso 40 x 40 cm -Rp bh

Ubin Warna 20 x 20 cm -Rp bh

Ubin Warna 30 x 30 cm -Rp bh

Ubin Warna 40 x 40 cm -Rp bh

Underlyer, tebal 6 mm / Rubber Corr ugated-

Rp m2Urinoir  -Rp bh

Venetions Blinds -Rp m2

Vernis -Rp Ltr 

Vinyl  Asbes 30 x 30 cm -Rp Bh

Vinyl Karet 30 x 30 cm KL I -Rp Bh

Vinyl Karet 30 x 30 cm KL II -Rp Bh

Vinyl Motif Kembang ex DN-

Rp BhVinyl Wall Covering lebar 50 cm -Rp m2

Wall Paper  -Rp m3

Water Drain +  Asesories -Rp set

Waterstop lebar 150 mm -Rp m'

Waterstop lebar 200 mm -Rp m'

Waterstop lebar 230 mm -Rp m'

Waterstop lebar 250 mm -Rp m'

Waterstop lebar 300 mm -Rp m'

Waterstop lebar 320 mm -Rp m'

Pipa Galvanis D 4" -Rp m'

Pipa PVC D 1/2" -Rp m'

Pipa PVC tipe  AW Ø ¾" -Rp m'

Pipa PVC tipe  AW Ø 1½" -Rp m'

Pipa PVC tipe  AW Ø 1" -Rp m'

Pipa PVC tipe  AW Ø 2"-

Rp m'

Pipa PVC tipe  AW Ø 2½" -Rp m'

Pipa PVC tipe  AW Ø 3" -Rp m'

Pipa PVC tipe  AW Ø 4" -Rp m'