Analisa SNI 2015.

161

Click here to load reader

description

Analisa Harga Satuan SNI 2015

Transcript of Analisa SNI 2015.

Upah Bahan

DINAS PEKERJAAN UMUM42200KOTA PADANG PANJANG 42500tahun anggaran 201455781.2563750NO.URAIANSATUANHARGAKETERANGANA.UPAH11413.68421052631DriverOH7900052,500-2650038400600002Kepala TukangOH10300060,000-4300055781675003MandorOH10000060,000-40000675004PekerjaOH7500040,000-35000450005Pembantu DriverOH7500040,000-35000450006Pembantu TukangOH7500040,000-35000450007Penjaga MalamOH7500040,000-35000450008Tukang Masak AspalOH9500052,500-42500600009Tukang AnyamOH9500052,500-425006000010Tukang BatuOH9500052,500-425006000011Tukang BesiOH9500052,500-425006000012Tukang Besi KonstruksiOH9500052,500-425006000013Tukang CatOH9500052,500-425006000014Tukang GaliOH9500052,500-425006000015Tukang KayuOH9500052,500-425006000016Tukang LasOH9500052,500-425006000017Tukang Lebur AspalOH9500052,500-425006000018Tukang Masak AspalOH9500052,500-425006000019Tukang PeliturOH9500052,500-4250060000ERROR:#N/AERROR:#N/AB.BAHANERROR:#N/AERROR:#N/AI.SemenERROR:#N/AERROR:#N/A1PC WarnaKg22502,2500.02Semen (50 kg)zak6500050,000-150003Semen Abu-abuKg1300960-3404Semen MerahM31200000BJ (kg/m3) =1,2501,200,0000.05Semen Merah/Bata Merah TumbukKg23502,250-1006Semen NatKg50002,250-27507Semen PortlandKg13001,100-2008Semen PutihKg23502,250-1009Semen Putih (40 kg)zak9400090,000-400010Semen Tahan AsamKg23502,250-10011Semen WarnaKg50002,250-2750ERROR:#N/AERROR:#N/AII.Bahan Galian, Pasangan dan BetonERROR:#N/AERROR:#N/A1Abu Batu / Pasir SaringM39500095,0000.02AspalKg83007,800-5003Bata BeronggaBh18501,8500.04Bata KerawangBh62501,850-44005Bata MerahBh800575-2256Bata Pelapis DindingBh600575-257Bata Pelapis KlinkerBh5755750.08BatakoBh26001,850-7509Batu ApungKg10001,0000.010Batu BataBh800575-22511Batu Bata (M3)M3574919Vol 1 bh :0.0013915413,223-161696.01149838312Batu KaliM315750090,000-6750013Batu GranitoKg35000.0-350014Batu KerikilM314000087,500-5250015Batu KoralM310000097,500-250016Batu PalimananM28500095,0001000017Batu ParosBh7007000.018Batu Tempel HitamBh7007000.019Cincin SumuranBh270000Dia 1 M235,821-34179.461111111120Concrete Block (CB.10)Bh15001,5000.021Concrete Block (CB.15)Bh17501,7500.022Concrete Block (CB.20)Bh20002,0000.023Cyclopen Beton K 225 + 40% Batu KaliM3722545ERROR:#N/AERROR:#N/A24Formtie / Penjaga Jarak Bekisting / SpacerBh5005000.025Hollow Block (HB.10)Bh15001,5000.026Hollow Block (HB.15)Bh17001,7505027Hollow Block (HB.20)Bh20002,0000.028HollowbrickBh17001,7505029Kerikil BetonM315000087,500-6250030Kerikil SaringM312500090,000-3500031Kerikil TimbunanM39000082,500-750032Kolom Beton PracetakBtg350000350,0000.033Koral 2/3M3225000117,500-10750034Koral BetonM3150000BJ (kg/m3) =1,35085,000-6500035Kerikil Beton (kg)Kg11165-46.296296296336Panel Beton PracetakLbr3585197,117193532.02539046737Pasir BetonM3140000BJ (kg/m3) =1,40080,000-6000038Pasir Beton (kg)Kg10057-42.857142857139Pasir PasangM314000080,000-6000040Pasir SilikaKg93BJ (kg/m3) =1,50053-4041Pasir UrugM36500050,000-1500042Paving BlockBh20001,600-40043Pipa Beton Dia. 15 - 20 cmBh4000040,0000.044Pipa Beton Dia. 30 - 100 cmBh15000050,000-10000045Pipa Tanah Dia. 15 cmBh4000040,0000.046Pipa Tanah Dia. 20 cmBh5000050,0000.047Puzzdith - 100 x RLtrERROR:#NUM!ERROR:#NUM!ERROR:#NUM!48RapidrantGlnERROR:#NUM!ERROR:#NUM!ERROR:#NUM!49Roster/terawangBh500003,500-4650050SirtuM314000080,000-6000051Split 0,5 - 1M3237500BJ (kg/m3) =1,400135,000-10250052Split 0,5 - 1Kg170135,000134830.357142857135002530Stronox - 100Kg10000ERROR:#NUM!ERROR:#NUM!54Tanah LiatM33500035,0000.055TimbunanM36250027,500-35000ERROR:#N/AERROR:#N/AIII.Bahan Kayu dan TumbuhanERROR:#N/AERROR:#N/A1Alang-alangIkat25002,5000.02Bambu 6-8/600 cmBtg50005,0000.03Gebalan RumputM21325013,2500.04IjukKg1500015,0000.05Ijuk SaringanKg1500015,0000.06KayuM325000001,600,000-9000001,600,0007Kayu 2/3 Klas IVM31600000ERROR:#N/AERROR:#N/A1,600,0008Kayu 2/3 Klas IIM32500000ERROR:#N/AERROR:#N/A1,600,0009Kayu 3/4 Klas IVBtg12000ERROR:#N/AERROR:#N/A1,600,00010Kayu 3/4 Klas IIM32500000ERROR:#N/AERROR:#N/A1,900,00011Kayu 3/4 (Btg) Klas IIBtg12000ERROR:#N/AERROR:#N/A26,60012Kayu 5/7 Klas IVM31600000ERROR:#N/AERROR:#N/A1,600,00013Kayu 5/7 Klas IIM32500000ERROR:#N/AERROR:#N/A1,600,00014Kayu 5/7 (BTG) Klas IVBtg35000ERROR:#N/AERROR:#N/A4,000,00015Kayu ApiM34000001,600,00012000004,000,00016Kayu BakarM34000001,600,00012000002,000,00017Kayu Banio Klas IM344000004,000,000-4000002,000,00018Kayu BorneoM344000004,000,000-4000002,000,00019Kayu Borneo BalokM344000002,000,000-24000001,600,00020Kayu Borneo Damar Laut BalokM344000002,000,000-240000021Kayu Borneo PapanM344000002,000,000-240000022Kayu CetakanM316000001,600,0000.023Kayu Dolken 8-10/400 cmBtg2000016,800-320024Kayu Dolken -8 cm / 4 mBtg2000016,800-320025Kayu Dolken -8-10/4 m GalamBtg2000016,800-320026Kayu Dolken -8-4-10/4 m GalamBtg2000016,800-320027Kayu Jati BalokM340000004,000,0000.028Kayu Jati PapanM340000004,000,0000.029Kayu Klas I BalokM344000004,000,000-40000030Kayu Klas I Papan M344000004,000,000-40000031Kayu Klas II BalokM325000002,000,000-50000032Kayu Klas II Papan M330000002,000,000-100000033Kayu Klas III Papan M325000001,900,000-60000034Kayu Klas IVM318000001,600,000-20000035Kayu Marsawa Klas IIM330000002,000,000-100000036Kayu MerantihM325000002,000,000-50000037Kayu Merantih BalokM325000002,000,000-50000038Kayu Merantih PapanM325000002,000,000-50000039Kayu Perancah M318000001,600,000-20000040Kayu ProfilM137505,000125041Kayu Tiang PancangM166506,6500.042Kisi-kisiBtg500018,2401324043Les 1 x 4Btg75006,080-142044Les KacaM115201,5200.045List Kayu 2/4M330000002,000,000-100000046List Kayu ProfilM137504,56081047PohonBtg5000050,0000.0ERROR:#N/AERROR:#N/AIV.Bahan Allumunium, Baja, Besi dan KawatERROR:#N/AERROR:#N/A1Alluminium StripM12500025,0000.02Besi Angker PembukaKg75007,5000.03Besi BegolBh5005000.04Besi Beton (Polos / Ulir)Kg90007,600-14005Besi Beton PolosKg90007,600-14006Besi GotBtg5005000.07Besi Jaring Kawat BajaKg1000010,0000.08Besi Lis Kaca (1x1) cmM150005,0000.09Besi Plat BajaKg1140011,4000.010Besi Presstressed PolosKg1000010,0000.011Besi Profil IWFKg90009,0000.012Besi Scuare TubeM11000010,0000.013Besi Siku L.30.30.3Kg80001 btg = 4500010,000200014Besi Strip (0,2x2)cmKg800010,000200015Besi Strip 2 x 3M1175007,500-1000016Besi Strip Tebal 5 mmKg1500010,000-500017Kawat BetonKg1500012,000-300018Kawat BurungM21500015,0000.019Kawat DigalvanoKg2300023,0000.020Kawat DuriKg120001 rol =120,00012,0000.021Kawat HarmonikaM21800020,000200022Kawat KassaM21800010,000-800023Kawat LasKg2650015,000-1150024Kawat NyamukM2225009,000-1350025Kawat Seng PolosKg1500015,0000.026Paku 1 cm - 2,5 cmKg1450014,000-50027Paku 1,5"Kg1450014,000-50028Paku 10 cmKg1450013,000-150029Paku 12 cmKg1450013,000-150030Paku 2 - 5"Kg1450013,000-150031Paku 2 - 6"Kg1200013,000100032Paku 5 cm - 10 cmKg1200013,000100033Paku 5 cm - 12 cmKg1200013,000100034Paku 5 cm - 7 cmKg1300013,0000.035Paku Hak Panjang 15 cmKg1600016,0000.036Paku PancingKg1600016,0000.037Paku Pancing 60 x 230Kg1600016,0000.038Paku Pancing 60 x 230Bh1600016,0000.039Paku RRCKg220001 KTK27,500550040Paku Sekrup 1 cm - 2,5 cmBh1001 KTK8,0001000.041Paku Sekrup 3,5"Bh1001000.042Paku Sekrup 3,5" (Kg)Kg1600016,0000.043Paku Skrup 10 cmKg1600016,0000.044Paku TriplekKg140001 KTK16,00013,000-1000ERROR:#N/AERROR:#N/AV.Bahan Pelapis Dinding dan LantaiERROR:#N/AERROR:#N/A1Bondbeam 40 x 20 x 20 cmBhERROR:#NUM!ERROR:#NUM!ERROR:#NUM!2CarpetM21500050,000350003Carpet 80 % Wool, 20 % NylonM2200000200,0000.04Feltex Carpet 100 % Wool T-21M2ERROR:#NUM!ERROR:#NUM!ERROR:#NUM!5Floor Hardener FerrovaxKg1500015,0000.06GymfloorM23500035,0000.07Internal Cove (5 x 5 x 20) cmBh30003,0000.08Keramik 10 x 10 cm Plint ArtistikBh8008000.09Keramik 10 x 20Ktk58000isi (bh)5045,000-1300010Keramik 10 x 20 cmBh9009000.011Keramik 10 x 20 cm ArtistikBh900Luas (M2)0.029000.012Keramik 10 x 20 cm Plint ArtistikBh9009000.013Keramik 15 x 15 cmBh10001,0000.014Keramik 20 x 20 cmBh20001,800-20015Keramik 20 x 20 Motif TimbulKtk61000isi (bh)2547,000-140002,44016Keramik 20 x 20 PolosKtk6250045,000-1750017Keramik 20 x 25 MotifKtk63000isi (bh)2045,000-1800018Keramik 30 x 30 cm GranitoKtk95000isi (bh)1195,0000.019Keramik 30 x 30 cm MosaikBh40004,0000.020Keramik 30 x 30 MotifKtk46000isi (bh)1145,000-10000.9921Keramik 30 x 30 PolosKtk58000isi (bh)1137,000-2100022Keramik 40 x 40 PolosKtk63000isi (bh)6ERROR:#N/AERROR:#N/A23Keramik 60 x 60 cm GranitoBh583331 ktk175,000ERROR:#N/AERROR:#N/A24Keramik 5 x 20 cm ArtistikBh450Luas (M2)0.014500.025Keramik 5 x 20 cm Plint ArtistikBh4504500.026Mastercron "S"KgERROR:#NUM!ERROR:#NUM!ERROR:#NUM!27Parquet JatiM23500035,0000.028Porselin 10 x 20 cm WarnaBh850Luas (M2)0.028500.029Porselin 11 x 11 cmBh436Luas (M2)0.0124360.030Porselin 11 x 11 cm WarnaBh544Luas (M2)0.0125450.031Porselin 15 x 15 cm PutihBh810Luas (M2)0.0238100.032Porselin 15 x 15 cm WarnaBh1012Luas (M2)0.0231,0130.033Porselin 20 x 20 cm WarnaBh1800Luas (M2)0.0401,8000.034Tegel Biasa PlintBh4504500.035Teralux CorM3ERROR:#N/AERROR:#N/AERROR:#N/A36Teraso CorM3ERROR:#N/AERROR:#N/AERROR:#N/A37Ubin 10 x 10 cm Keramik ArtistikBhERROR:#N/ALuas (M2)0.010ERROR:#N/AERROR:#N/A38Ubin 10 x 20 cm Keramik ArtistikBhERROR:#N/AERROR:#N/AERROR:#N/A39Ubin 10 x 20 cm PC Warna PlintBhERROR:#N/AERROR:#N/AERROR:#N/A40Ubin 10 x 30 cm Granito PlintBhERROR:#N/AERROR:#N/AERROR:#N/A41Ubin 10 x 30 cm PC Warna PlintBhERROR:#N/AERROR:#N/AERROR:#N/A42Ubin 10 x 30 cm PlintBhERROR:#N/AERROR:#N/AERROR:#N/A43Ubin 10 x 30 cm Teralux Kerang PlintBhERROR:#N/AERROR:#N/AERROR:#N/A44Ubin 10 x 30 cm Teralux Marmer PlintBhERROR:#N/AERROR:#N/AERROR:#N/A45Ubin 10 x 30 cm Teraso PlintBhERROR:#N/AERROR:#N/AERROR:#N/A46Ubin 10 x 33 cm KeramikBhERROR:#N/AERROR:#N/AERROR:#N/A47Ubin 10 x 40 cm Granito PlintBhERROR:#N/AERROR:#N/AERROR:#N/A48Ubin 10 x 40 cm PC Warna PlintBhERROR:#N/AERROR:#N/AERROR:#N/A49Ubin 10 x 40 cm PlintBhERROR:#N/AERROR:#N/AERROR:#N/A50Ubin 10 x 40 cm Teralux Kerang PlintBhERROR:#N/AERROR:#N/AERROR:#N/A51Ubin 10 x 40 cm Teralux Marmer PlintBhERROR:#N/AERROR:#N/AERROR:#N/A52Ubin 10 x 40 cm Teraso PlintBhERROR:#N/AERROR:#N/AERROR:#N/A53Ubin 10 x 60 cm Teralux Marmer PlintBhERROR:#N/AERROR:#N/AERROR:#N/A54Ubin 100 x 100 cm Teralux MarmerBhERROR:#N/AERROR:#N/AERROR:#N/A55Ubin 15 x 15 cm KeramikBhERROR:#N/AERROR:#N/AERROR:#N/A56Ubin 15 x 20 cm KeramikBhERROR:#N/AERROR:#N/AERROR:#N/A57Ubin 15 x 20 cm PlintBhERROR:#N/AERROR:#N/AERROR:#N/A58Ubin 20 x 20 cm Abu-abuBh1500ERROR:#N/AERROR:#N/A59Ubin 20 x 20 cm KeramikBh1760Luas (M2)0.0401,7600.060Ubin 20 x 20 cm WarnaBhERROR:#N/AERROR:#N/AERROR:#N/A61Ubin 25 x 25 cm KeramikBh3125Luas (M2)0.0633,1250.062Ubin 30 x 30 cm Abu-abuBh60006,0000.063Ubin 30 x 30 cm GranitoBh87501 ktk = 95,0008,550-20064Ubin 30 x 30 cm KeramikBh6000Luas (M2)0.0906,0000.065Ubin 30 x 30 cm Teralux KerangBh60006,0000.066Ubin 30 x 30 cm Teralux MarmerBh60006,0000.067Ubin 30 x 30 cm TerasoBh60006,0000.068Ubin 30 x 30 cm WarnaBh60006,0000.069Ubin 33 x 33 cm KeramikBh6000Luas (M2)0.0906,0000.070Ubin 33 x 33 cm Keramik Anti SlipBh60006,0000.071Ubin 40 x 40 cm Abu-abuBh22400Luas (M2)0.16021,600-80072Ubin 40 x 40 cm GranitoBh224001 ktk140,00021,600-80073Ubin 40 x 40 cm Teralux KerangBh22400isi (bh)621,600-80074Ubin 40 x 40 cm Teralux MarmerBh2240021,600-80075Ubin 40 x 40 cm TerasoBh2240021,600-80076Ubin 40 x 40 cm WarnaBh2240021,600-80077Ubin 5 x 20 cm Keramik ArtistikBh1066710,6670.078Ubin 60 x 60 cm GranitoBh437501 ktk175,000ERROR:#N/AERROR:#N/A79Ubin PCBh2000Luas (M2)0.0402,0000.080Ubin PorselenM25000050,0000.081Ubin Tahan AsamM25000050,0000.082Vinyil Karet 30 x 30 kwl IBh3000Luas (M2)0.0903,0000.083Vinyl Asbest 30 x 30 cmBh30003,0000.084Vinyl Karet 30 x 30 cm KL IBh30003,0000.085Vinyl Karet 30 x 30 cm KL IIBh30003,0000.086Vinyl Motif Kembang Ex DNBh30003,0000.087Vinyl Wall Covering, Lebar 50 cmBh1500015,0000.088Wall PaperM21250012,5000.0ERROR:#N/AERROR:#N/AVI.Bahan Pelapis PlafondERROR:#N/AERROR:#N/A1Akustik 30 x 30 cmLbr1500015,0000.02Akustik 30 x 60 cmLbr2000020,0000.03Akustik 60 x 120 cmLbr8000080,0000.04Akustik Arm Atrong 60 x 120 cmLbr8000080,0000.05Eternitlbr1600016,0000.06FormicaLbr5129951,2990.07Formica 4' x 3'Lbr5129951,2990.08Formica 4' x 8'Lbr120000120,0000.09Gypsum Board (120 x 240 x 9) mmLbr125000125,0000.010LamberseringLbr1750013,500-400011Plywood Tebal 4 mmLbr65000Luas (M2)2.9848,250-1675012Plywood Tebal 6 mmLbr8500067,500-1750013Plywood Tebal 9 mmLbr117500110,000-750014Plywood Ukuran 120 x 240 x 4 mmLbr7000070,0000.015Plywood Ukuran 90 x 220 x 4 mmLbr3788337,8830.016Ramset / Dina BoftBh1500015,0000.017Soft Board 4" x 8" x 4 mmLbr7000070,0000.018TadirM270007,0000.019TeackwoodM22638926,042-347.222222222220Teakwood Ukuran 120 x 240 x 4 mmLbr76000Luas (M2)2.8875,000-100021Teakwood Ukuran 90 x 220 x 4 mmLbr51562Luas (M2)1.9851,5630.022Triplek Tebal 4 mmLbr6600048,250-1775023Triplek Tebal 6 mmLbr8500067,500-1750024Underlyer Tebal 6 mm / Rubber CorrugatedM26750067,5000.0ERROR:#N/AERROR:#N/AVII.Bahan Pintu dan JendelaERROR:#N/AERROR:#N/A1Door CloseBh1000010,0000.02Door HolderBh1000010,0000.03Door StopBh500010,00050004Engsel AnginBh150007,750-72505Engsel JendelaBh1000010,0000.06Engsel PintuBh2400012,500-115007Jendela BesiM3ERROR:#NUM!ERROR:#NUM!ERROR:#NUM!8Jendela Besi Tahan ApiM3ERROR:#NUM!ERROR:#NUM!ERROR:#NUM!9Jendela NakoBh33003,3000.010Jendela Nako (Rangka + Kaca 5 mm)M27500075,0000.011Kaca Buram 12 mmM2100000100,0000.012Kaca Cermin 12 mmM2125000125,0000.013Kaca Cermin 6 mmM27000070,0000.014Kaca Cermin 8 mmM28500085,0000.015Kaca Patri 5 mmM25500055,0000.016Kaca Tebal 3 mmM25000045,000-500017Kaca Tebal 5 mmM28000055,000-2500018Kaca Wireglass 5 mmM26000060,0000.019Kait AnginBh100005,000-500020Kunci LemariBh120008,000-400021Kunci SelotBh1500015,0000.022Kunci SilinderBh80000140,0006000023Kunci Tanam AntikBh150000140,000-1000024Kunci Tanam BiasaBh5500090,0003500025Kunci Tanam Kamar MandiBh5000045,000-500026Kuzen AlumuniumM15500055,0000.027Pintu AlluminiumM2400000300,000-10000028Pintu Besi BajaM3ERROR:#NUM!ERROR:#NUM!ERROR:#NUM!29Pintu Gulung BesiM3200000200,0000.030Pintu LipatM2450000450,0000.031Profil AlluminiumM15500055,0000.032Profil KacaM150005,0000.033Rel Pintu DorongBh100000ERROR:#NUM!ERROR:#NUM!34Roll Door Tebal 5mmM2500000Folding GateERROR:#N/AERROR:#N/A35Roll Door Tebal 8mmM2800000ERROR:#N/AERROR:#N/A36Rolling Door AluminiumM2200000200,0000.037Spring KnipBh60000ERROR:#NUM!ERROR:#NUM!38Sunscreen AlluminiumM285000ERROR:#NUM!ERROR:#NUM!39Venetions BlindsM28500085,0000.040Vertikals BlindsM28500085,0000.0ERROR:#N/AERROR:#N/AVIII.Bahan AtapERROR:#N/AERROR:#N/A1Asbes 1.00 x 1.00 mLbr14146Luas (m2)1.0014,1460.02Asbes Bubungan Gelombang 0,92Lbr2450023,393-1107.14285714293Asbes Gelombang (1,50 x 1,05 m) x 4 mmLbr24500Luas (m2)1.5823,393-1107.14285714294Asbes Gelombang (1,80 x 0,92 m) x 5 mmLbr24500Luas (m2)1.6623,393-1107.14285714295Asbes Gelombang (1,80 x 1,08 m) x 6 mmLbr24000Luas (m2)1.9427,50035006Asbes Gelombang (2,00 x 0,92 m) x 5 mmLbr24000Luas (m2)1.8427,50035007Asbes Gelombang (2,10 x 1,05 m) x 4 mmLbr32750Luas (m2)2.2132,7500.08Asbes Gelombang (2,10 x 1,08 m) x 6 mmLbr32083Luas (m2)2.2732,0830.09Asbes Gelombang (2,25 x 0,92 m) x 5 mmLbr3208332,0830.010Asbes Gelombang (2,40 x 1,05 m) x 4 mmLbr36750Luas (m2)2.5236,7500.011Asbes Gelombang (2,40 x 1,08 m) x 6 mmLbr36667Luas (m2)2.5936,6670.012Asbes Gelombang (2,50 x 0,92 m) x 5 mmLbr3666736,6670.013Asbes Gelombang (2,70 x 1,05 m) x 4 mmLbr41250Luas (m2)2.8441,2500.014Asbes Gelombang (2,70 x 1,08 m) x 6 mmLbr41250Luas (m2)2.9241,2500.015Asbes Gelombang (3,00 x 1,05 m) x 4 mmLbr64000Luas (m2)3.1564,0000.016Asbes Gelombang (3,00 x 1,08 m) x 6 mmLbr45833Luas (m2)3.2445,8330.017Atap Alluminium Gelombang Tebal 0,55M255000ERROR:#NUM!ERROR:#NUM!18Atap Seng BJLS 20Lbr5500032,250-2275019Atap Seng BJLS 20 WarnaLbr5700040,000-1700020Atap Seng BJLS 30Lbr7000052,500-1750021Bubungan Gentang MetalLbr2000023,000300022Bubungan Seng BJLS 20Lbr1300023,0001000023Genteng AspalLbr9000050,750-3925024Genteng BetonBh5075050,7500.025Genteng Bubung KodokBh2300023,0000.026Genteng Bubung PalentongBh2300023,0000.027Genteng Decra BondBh5075050,7500.028Genteng KodokBh5075050,7500.029Genteng MetalM28000050,750-2925030Genteng PalentongBh5075050,7500.031Genteng Palentong SuperBh5075050,7500.032Genteng SirapBh5075050,7500.033Nok Genteng BetonBh2500023,000-200034Nok Paten 0,92 mLbr2300023,0000.035Nok Paten 1,05 mLbr2300023,0000.036Nok Paten 1,08 mLbr2300023,0000.037Nok Standar 40 cm 18, swg 22M22300023,0000.038Nok Stek Gelombang 1,05 mLbr2300023,0000.039Nok Stek Gelombang 1,08 mLbr2300023,0000.040Nok Stel Rata 0,92 mLbr2300023,0000.041Nok Stel Rata 1,05 mLbr2300023,0000.042Pelat Asbes Tebal 3,5 mmLbr2875028,7500.043Pelat Asbes Tebal 4 mmLbr3000030,0000.044Pelat Asbes Tebal 5 mmLbr3250032,5000.045Pelat Asbes Tebal 6 mmLbr3500035,0000.046Atap FiberLbr70625ERROR:#N/AERROR:#N/A47Atap Polycarbonatem2605001.350.000,00/lmbr, excellent48Seng Gelombang 3" x 5"Lbr4000040,0000.049Seng Gelombang 3" x 6" BJLS 20Lbr5500032,250-2275050Seng Gelombang BJLS 30Lbr4850050,000150051Seng PlatLbr4600034,500-1150052Seng Plat 3" x 6" BJLS 20Lbr4600034,500-1150053Seng Plat 3" x 6" BJLS 30Lbr6800052,500-1550054Seng Plat BJLS 20M24600034,500-1150055Sisalation / Alluminium foilM255000ERROR:#N/AERROR:#N/A56Waterproof BatacoteKg4500045,0000.057Reng / Topspan"1"01600058Baut/Srew 14/20Pcs65059Baut/Srew 16/16Pcs60060DynaboltPcs264056761Baja Ringan Profil C. 75. 100"1"0265009162Baja Ringan Profil C. 75. 0.75"1"02550065863Reng/Topspan"1"02300082.2564Baut/Screw 14/20Pcs7501555.532510629565Baut/Screw 16/16Pcs65066Talang"1"015000ERROR:#N/AERROR:#N/AIX. Bahan SanitasiERROR:#N/AERROR:#N/A1BadkipBh2500ERROR:#NUM!ERROR:#NUM!1Bak Cuci Stainles SteelBh170000177,50075002Bak Cuci TerasoBh210000210,0000.03Bak FiberglassBh335000175,000-1600004Bak TerasoBh210000210,0000.05Floor Drain PlastikBh10000ERROR:#N/AERROR:#N/A6Floor Drain Stainless SteelBh47500ERROR:#N/AERROR:#N/A7Kloset Duduk / MonoblokBh475000350,000-1250008Kloset Duduk / OtomatisBh1650000ERROR:#N/AERROR:#N/A9Kloset JongkokBh185000212,5002750010Kloset Jongkok PorselenBh185000212,5002750011Kloset Jongkok TerasoBh185000200,0001500012Kran Air (Plastik)Bh10000ERROR:#N/AERROR:#N/A13Kran Air (Stainless Steel)Bh25000ERROR:#N/AERROR:#N/A14Pipa Galvanis Dia. 0,5"M1108331 btg :65,00012,5001666.666666666715Pipa Galvanis Dia. 0,75"M1137501 btg :82,50015,000125016Pipa Galvanis Dia. 1"M1180001 btg :95,00025,000700018000017Pipa Galvanis Dia. 1,5"M1260001 btg :132,00032,500650018Pipa Galvanis Dia. 2"M1300001 btg :163,00041,5001150019Pipa Galvanis Dia. 3"M1465001 btg :279,00058,5001200020Pipa Galvanis Dia. 4"M1650001 btg :390,000116,5005150021Pipa Hawa Dia. 0,75 "M1137501,500-1225022Pipa Hawa Dia. 1,5 "M1260002,600-2340023Pipa Paralon Dia. 4 "M12125042,5002125024Pipa PVC Dia. 0,5"M142501 btg :17,0005,500125025Pipa PVC Dia. 0,75"M150001 btg :20,0006,250125026Pipa PVC Dia. 1"M160001 btg :24,0007,500150027Pipa PVC Dia. 1,5"M175001 btg :30,0008,750125028Pipa PVC Dia. 2"M195001 btg :38,00013,750425029Pipa PVC Dia. 2,5"M1125001 btg :50,00020,000750030Pipa PVC Dia. 3"M1163751 btg :65,50027,5001112531Pipa PVC Dia. 4"M1231251 btg :92,50042,5001937532Seal TapeBh20002,0000.033SealentTube1000025,0001500034UrinoirBh650000450,000-20000035WashtafelBh675000Lengkap600,000-7500036Water Drain + AsesoriesSet3500035,0000.037Waterstop Lebar 150 mmM1150000150,0000.038Waterstop Lebar 200 mmM1200000200,0000.039Waterstop Lebar 230 mmM1230000230,0000.040Waterstop Lebar 250 mmM1250000250,0000.041Waterstop Lebar 300 mmM1300000300,0000.042Waterstop Lebar 320 mmM1320000320,0000.0ERROR:#N/AERROR:#N/AX.Bahan PengecatanERROR:#N/AERROR:#N/A1Aluminium BKg3500035,0000.02Aluminium CKg3500035,0000.03AmpelasLbr40002,500-15004CatKg4500038,500-65005Cat AirKg2000018,000-20006Cat AntaraKg4200042,0000.07Cat DasarKg1800015,000-30008Cat MenieKg1900017,500-15009Cat Penutup (Cat Air)Kg2160018,000-360010Cat Penutup (Cat Minyak)Kg4500038,500-650011Cat Vinil / MatexKg1800038,5002050012Cat WarnaKg4500038,500-650013DempulKg1500035,0002000014Dempul JadiKg1500017,500250015Dempul Wall PutihKg1200017,500550016Flincote / Meni BesiKg1500015,0000.017KalkariumKg2000020,0000.018Kapur PadamM3125000125,0000.019Kapur PasangKg2812810.020Kapur SirihM3150000281-149718.7521Kapur SirihKg2812810.022KuasBh150008,000-700023Meni (Read Lead) AKg1750017,5000.024Meni (Read Lead) BKg2000020,0000.025Meni BesiKg2250014,000-850026Minyak BekistingLtr500020,0001500027Minyak CatKg1500038,0002300028Minyak PelumasLtr2000020,0000.029Pelumasltr2000020,0000.030PengencerLtr1200013,500150031Plamur TembokKg1500011,000-400032Plastic AeratorBh50005,0000.033PoliturLtr1500015,0000.034Politur JadiLtr4500030,000-1500035Polytur MelamideKg5000030,000-2000036ResiduKg1500015,0000.037ResiduLtr1000015,000500038Residu Atau TerLtr100009,000-100039SabunKg1000010,0000.040Soda ApiKg500005,000-4500041Solarltr46004,6000.042Spiritusltr1350013,5000.043Teak OilLtr2000020,0000.044VernisLtr1750017,5000.0ERROR:#N/AERROR:#N/AXI.Bahan LainERROR:#N/AERROR:#N/A1BBMLtr76004,600-30002Bilik BambuM280008,0000.03Kompresor, Blasting Pot, Selang Dan NozzleHari100000100,0000.04Lem KayuKg1500010,000-50005Lem VinylKg1500010,000-50006MenggilasHari9000090,0000.07Pagar kawat JaringLbr160000160,0000.08PerekatKg1000010,0000.09Sewa Alat KonsruksiJam4000040,0000.010Sewa Mesin & Spare PartHari9000090,0000.011Tali IjukKg1250012,5000.012Ongkos MematriM150005,0000.0

Padang Panjang, Januari 2014

DisetujuiDibuat olehKabid. Perencanaan dan Pengawasan TeknisKasi Perencanaan KeciptakaryaanDinas Pekerjaan Umum Kota Padang PanjangBidang Perencanaan dan Pengawasan TeknisDinas Pekerjaan Umum Kota Padang Panjang

HENDRA PUTRA, SST, MTHENDRI YANI, ST, MT, MScNIP. 19700107 199003 1 003NIP. 19780708 200212 2 005

DiketahuiKepala Dinas Pekerjaan UmumKota Padang Panjang

DEFRIAL, STNIP. 19561206 198103 1 009

PekerjaanDAFTAR HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNANDINAS PEKERJAAN UMUMKOTA PADANG PANJANG tahun anggaran 2014

NOURAIANSATHARGA SATUANKETERANGANAAnalisa Biaya Konstruksi Pekerjaan Persiapan1Pagar Sementara Dari Kayu (T. 2M)"1"022580010.0197,418(28,382.50)2Pagar Sementara Dari Seng Gelombang (T.2M)"1"028310020.0245,718(37,382.50)3Pagar Sementara Dari Kawat Duri (T.1,8M)"1"040800030.0345,868(62,132.50)4Pengukuran dan Pemasangan Bouwplank"1"06100040.046,510(14,490.00)5Pembuatan Kantor Sementara dengan Lantai Plesteran"1"0124980050.0714,445(535,355.00)6Pembuatan Gudang Semen dan Alat-alat"1"0104640060.0621,785(424,615.00)7Pembuatan Rumah Jaga / Konstruksi Kayu"1"0117600070.0706,850(469,150.00)8Membersihkan Lapangan dan Peralatan"1"01370080.07,000(6,700.00)9Pembuatan Bedeng Buruh"1"0107770090.0649,213(428,487.50)10Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm"1"0170000100.0115,480(54,520.00)11Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm"1"032900110.019,918(12,982.50)12Pembuatan Jalan Sementara"1"0131100120.065,400(65,700.00)13Bongkaran Beton Bertulang"1"0586600130.0286,660(299,940.00)14Bongkaran Dinding Tembok Batu Bata"1"0550300140.0266,860(283,440.00)15Bongkaran Lantai BetonM29300150.04,600(4,700.00)16Mengupas Plesteran LamaM244000160.021,500(22,500.00)17Menurunkan Atap Genteng/SirapM217600170.08,600(9,000.00)18Bongkaran Atap SengM25600180.02,825(2,775.00)19Bongkaran Rangka AtapM211600190.05,763(5,837.50)20Bongkaran Loteng PapanM224500200.012,110(12,390.00)21Bongkaran Kayu Kuda-KudaM31046900210.0523,000(523,900.00)22Bongkaran Lantai KeramikM217600220.08,600(9,000.00)23Bongkaran PondasiM3374000230.0184,000(190,000.00)24Bongkaran KuzenM224500240.012,110(12,390.00)25Bongkaran JalanM2374000250.0184,000(190,000.00)26Pasang pagar kawat Jaring Galvanis (Tinggi 1 M)"1"084900260.073,685(11,215.00)27Pasang Pagar Beton Pracetak (5 x 50 x 213) cm"1"0365300270.0467,805102,505.07

BAnalisa Biaya Konstruksi Pekerjaan Tanah28Galian Tanah Biasa Sedalam 1 meter"1"064600280.031,500(33,100.00)29Galian Tanah Biasa Sedalam 2 meter"1"079200290.038,700(40,500.00)30Galian Tanah Biasa Sedalam 3 meter"1"093900300.046,020(47,880.00)31Galian Tanah Keras Sedalam 1 meter"1"086000310.041,920(44,080.00)32Galian Tanah Cadas Sedalam 1 meter"1"0130300320.063,600(66,700.00)33Galian Tanah Lumpur Sedalam 1 meter"1"0103900330.050,700(53,200.00)34Pekerjaan Stripping Tebing Setinggi 1 M"1"04600340.02,300(2,300.00)35Pembuangan Tanah Sejauh 30 meter"1"028300350.013,800(14,500.00)36Urugan Kembali"1"017900360.08,820(9,080.00)37Pemadatan Tanah (per 20 cm)"1"046700370.023,000(23,700.00)38Urugan Pasir"1"0111600380.072,600(39,000.00)39Lapisan Pudel campuran 1 Kp : 3 Ps : 7 TL"1"0204700390.0130,255(74,445.00)40Lapisan Pudel Campuran 1 Kp : 5 TL"1"0203200400.0134,880(68,320.00)41Pemasangan Lapisan Ijuk Tebal 10 cm"1"0113000410.096,900(16,100.00)42Urugan Sirtu Padat untuk peninggian lantai bangunan"1"0208100420.0107,500(100,600.00)

CAnalisa Biaya Konstruksi Pekerjaan Pondasi43Pasang Pondasi Batu Kali, 1 Pc : 3 Ps"1"0772900430.0468,600(304,300.00)44Pasang Pondasi Batu Kali, 1 Pc : 4 Ps"1"0722500440.0428,500(294,000.00)45Pasang Pondasi Batu Kali, 1 Pc : 5 Ps"1"0687600450.0400,720(286,880.00)46Pasang Pondasi Batu Kali, 1 Pc : 6 Ps"1"0663100460.0381,180(281,920.00)47Pasang Pondasi Batu Kali, 1 Pc : 8 Ps"1"0625900470.0352,580(273,320.00)48Pasang Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps"1"0686200480.0438,848(247,352.19)49Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps"1"0572400490.0314,101(258,298.66)50Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps"1"0548600500.0294,577(254,023.16)51Pasang Pondasi Batu Kosong (Aanstampang)"1"0352600510.0185,955(166,645.00)52Pasang Pondasi Siklop 60 % Beton 1PC : 2PB : 3KR"1"02042200520.01,437,235(604,965.00)53Pasang Pondasi Sumuran Diameter 100 cm"1"0720500530.0437,360(283,140.00)54Pekerjaan Cincin Sumuran Dia. 1 m'BH349600540.0235,821(113,779.46)55Pekerjaan Cincin Sumuran Dia. 1,2 m'BH464600550.0308,342(156,258.31)56Menurunkan Cincin Sumuran Sedalam 1 MBH138600560.068,625(69,975.00)57Menurunkan Cincin Sumuran Sedalam 2 MBH154800570.076,500(78,300.00)58Menurunkan Cincin Sumuran Sedalam 3 MBH187100580.092,250(94,850.00)59Campuran Batu Kali + Stamp Beton 1:2:3M3618400590.0379,325(239,075.05)60Cyclopen Beton 1:2:3 + 40 % Batu KaliM3794800600.0513,497(281,303.43)61Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1 MTTK1112100610.0707,539(404,561.18)62Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2 MTTK2101800620.01,354,331(747,469.30)63Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3 MTTK3107600630.02,008,996(1,098,603.95)64Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 1 MTTK1501600640.0957,423(544,176.79)65Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 2 MTTK2880800650.01,854,096(1,026,703.57)66Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 3 MTTK4276200660.02,758,645(1,517,555.36)

DAnalisa Biaya Konstruksi Pekerjaan Beton67Pekerjaan Beton K 100"1"0748000670.0473,205(274,795.36)68Pekerjaan Beton K 125"1"0786600680.0503,604(282,995.62)69Pekerjaan Beton K 150"1"0816900690.0527,571(289,328.69)70Pekerjaan Beton K 100 Lantai Kerja"1"0681400700.0433,893(247,506.61)71Pekerjaan Beton K 175"1"0852700710.0456,821(395,879.48)72Pekerjaan Beton K 200"1"0886900720.0582,893(304,007.00)73Pekerjaan Beton K 225"1"0912400730.0602,944(309,455.67)74Pekerjaan Beton K 250"1"0929300740.0616,383(312,917.05)75Pekerjaan Beton K 275"1"0958300750.0639,283(319,016.79)76Pekerjaan Beton K 300"1"0967400760.0646,488(320,912.29)77Pekerjaan Beton K 325"1"01049700770.0697,164(352,535.58)78Pekerjaan Beton K 350"1"01049700780.0697,164(352,535.58)79Membuat Beton Kedap Air Dengan Stronox - 100"1"01016400790.0ERROR:#NUM!ERROR:#NUM!80Memasang PVC Waterstop Lebar 150 mm"1"0182000800.0161,835(20,165.00)81Memasang PVC Waterstop Lebar 200 mm"1"0241600810.0215,298(26,302.50)82Memasang PVC Waterstop Lebar 230 mm - 320 mm"1"0277300820.0247,280(30,020.00)83Pembesian Dengan Besi Polos Atau Besi UlirKg12000830.08,874(3,126.50)84Kabel Presstressed Polos / StrandsKg12700840.011,131(1,569.50)85Jaring Kawat Baja / Wire MeshKg12000850.010,647(1,352.75)86Pasang Bekisting untuk Pondasi"1"0146300860.0119,470(26,830.00)87Pasang Bekisting Untuk Sloof"1"0154600870.0128,970(25,630.00)88Pasang Bekisting Untuk Kolom"1"0233900880.0234,9851,085.0089Pasang Bekisting Untuk Balok"1"0238000890.0240,9852,985.0090Pasang Bekisting Untuk Lantai"1"0431100900.0302,185(128,915.00)91Pasang Bekisting Untuk Dinding"1"0237500910.0244,7857,285.0092Pasang Bekisting Untuk Tangga"1"0315300920.0214,985(100,315.00)93Pasangan Jembatan Pengecoran Beton"1"0110500930.075,765(34,735.00)94Membuat Pondasi Beton Bertulang (150 Kg Besi + Bekisting)"1"03636400940.02,496,788(1,139,612.50)95Membuat Sloof Beton Bertulang (200 Kg Besi + Bekisting)"1"04469000950.03,098,473(1,370,527.50)96Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting)"1"07445400960.05,343,348(2,102,052.50)97Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting)"1"05799700970.04,121,698(1,678,002.50)98Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting)"1"05391300980.03,856,488(1,534,812.50)99Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting)"1"05105000990.03,649,908(1,455,092.50)100Membuat Tangga Beton Bertulang (200 Kg Besi + Bekisting)"1"053512001000.03,806,073(1,545,127.50)101Membuat Kolom Penguat Beton Bertulang (11 x 11) cm"1"0736001010.049,048(24,552.50)102Membuat Ring Balok Beton Bertulang (10 x 15) cm"1"0943001020.060,580(33,720.00)

EAnalisa Biaya Konstruksi Pekerjaan Dinding103Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 Ps"1"02736001030.0172,250(101,350.00)104Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Ps"1"02602001040.0161,525(98,675.00)105Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 4 Ps"1"02514001050.0154,645(96,755.00)106Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 5 Ps"1"02466001060.0150,580(96,020.00)107Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 6 Ps"1"02444001070.0148,110(96,290.00)108Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps"1"02278001080.0136,496(91,304.27)109Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps"1"01325001090.082,885(49,615.00)110Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Ps"1"01262001100.078,007(48,193.00)111Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 4 Ps"1"01226001110.075,090(47,510.00)112Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 5 Ps"1"01203001120.073,248(47,052.00)113Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 Ps"1"01190001130.072,072(46,928.00)114Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 8 Ps"1"01165001140.070,150(46,350.00)115Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps"1"01157001150.069,825(45,875.00)116Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps"1"01285001160.084,290(44,210.00)117Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps"1"01058001170.063,005(42,794.60)118Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP"1"02054001180.0121,893(83,507.00)119Pasangan Dinding Hollowblock (HB.20), 1PC : 4PP"1"02279001190.0137,513(90,387.00)120Pasangan Dinding Hollowblock (HB.15), 1PC : 3PP"1"01889001200.0115,517(73,383.00)121Pasangan Dinding Hollowblock (HB.15), 1PC : 4PS"1"01873001210.0113,083(74,217.00)122Pasangan Dinding Hollowblock (HB.10), 1PC : 3PS"1"01391001220.085,424(53,676.00)123Pasangan Dinding Hollowblock (HB.10), 1PC : 4PS"1"01372001230.083,371(53,829.00)124Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 3PP"1"020416001240.0161,630(1,879,970.00)125Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 4PP"1"017091001250.0138,650(1,570,450.00)126Pasang Bata Berongga Ukuran (5 x 11 x 24) cm, 1PC : 3PP"1"02111001260.0169,135(41,965.00)127Pasang Dinding PartisiM21946001270.0124,615(69,984.58)128Pasang Dinding Partisi DoubleM23625001280.0214,331(148,169.17)129Pasang Dinding Partisi TeakwoodM22006001290.0136,415(64,185.00)130Pasang Dinding Partisi Teakwood DoubleM23745001300.0237,930(136,570.00)131Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I"1"04852001310.0306,383(178,817.50)132Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II"1"05410001320.0316,282(224,717.79)133Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Klas II"1"01445001330.090,755(53,745.00)134Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II"1"02243001340.0159,575(64,725.00)135Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II"1"02324001350.0161,850(70,550.00)136Pasang Dinding Lambrizing Dari Papan Kayu Klas I"1"02991001360.0162,800(136,300.00)137Pasang Dinding Lambrizing Dari Plywood (120 x 240) cm"1"0424001370.034,166(8,234.50)138Pasang Dinding Bilik Rangka Kayu Klas III"1"0525001380.045,890(6,610.00)

FAnalisa Biaya Konstruksi Pekerjaan Plesteran139Plesteran 1 Pc : 1 Ps, Tebal 15 mm"1"0596001390.035,709(23,890.60)140Plesteran 1 Pc : 2 Ps, Tebal 15 mm"1"0526001400.030,221(22,378.60)141Plesteran 1 Pc : 3 Ps, Tebal 15 mm"1"0496001410.027,769(21,831.40)142Plesteran 1 Pc : 4 Ps, Tebal 15 mm"1"0475001420.026,159(21,341.00)143Plesteran 1 Pc : 5 Ps, Tebal 15 mm"1"0463001430.025,157(21,142.60)144Plesteran 1 Pc : 6 Ps, Tebal 15 mm"1"0454001440.024,393(21,007.40)145Plesteran 1 Pc : 7 Ps, Tebal 15 mm"1"0449001450.023,945(20,955.40)146Plesteran 1 Pc : 8 Ps, Tebal 15 mm"1"0443001460.023,497(20,803.40)147Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm"1"0439001470.024,231(19,669.00)148Plesteran 1 Pc : 2 Kp : 8 Ps, Tebal 15 mm"1"0413001480.022,005(19,295.00)149Plesteran 1 Pc : 1 Kp : 1 Ps, Tebal 15 mm"1"0358001490.018,335(17,465.10)150Plesteran 1 Pc : 1 Kp : 2 Ps, Tebal 15 mm"1"0365001500.018,563(17,937.30)151Plesteran 1 Pc : 2 Ps, Tebal 20 mm"1"0696001510.040,035(29,564.80)152Plesteran 1 Pc : 3 Ps, Tebal 20 mm"1"0656001520.036,765(28,835.20)153Plesteran 1 Pc : 4 Ps, Tebal 20 mm"1"0628001530.034,592(28,208.00)154Plesteran 1 Pc : 5 Ps, Tebal 20 mm"1"0613001540.033,283(28,016.80)155Plesteran 1 Pc : 6 Ps, Tebal 20 mm"1"0600001550.032,237(27,763.20)156Plesteran 1 Pc : 1 Sm : 2 Ps, Tebal 20 mm"1"0665001560.038,515(27,985.00)157Plesteran Berapen 1 Pc : 5 Ps, Tebal 15 mm"1"0327001570.018,357(14,342.60)158Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm"1"0517001580.026,280(25,420.00)159Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm"1"01040001590.033,170(70,830.00)160Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm"1"01455001600.053,700(91,800.00)161Plesteran Ciprat, 1 Pc : 2 Ps"1"0407001610.021,862(18,838.00)162Plesteran Siar Dinding Batu Bata 20 m'"1"0281001620.015,194(12,906.20)163Plesteran Siar Dinding Conblock 8 m'"1"0130001630.07,078(5,922.50)164Plesteran Siar Pasangan Batu Kali, 1PC : 2PP"1"0535001640.029,024(24,476.00)165Acian"1"0294001650.0ERROR:#N/AERROR:#N/A

GAnalisa Biaya Konstruksi Kuzen, Pintu dan Jendela166Pasang Kusen Pintu dan Jendela Kayu Klas I"1"082050001660.05,854,250(2,350,750.00)167Pasang Kusen Pintu dan Jendela Kayu Klas II"1"059720001670.03,749,250(2,222,750.00)168Pasang Pintu Klamp Standar Kayu Klas II"1"02851001680.0157,155(127,945.00)169Pasang Pintu Klamp Sederhana Kayu Klas III"1"02631001690.0153,155(109,945.00)170Pasang Daun Pintu Panel Kayu Klas II"1"05260001700.0279,250(246,750.00)171Pasang Pintu dan Jendela Kaca Kayu Klas II"1"03862001710.0202,400(183,800.00)172Pasang Pintu dan Jendela Jalusi Kayu Klas II"1"06549001720.0351,500(303,400.00)173Pasang Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm)"1"03995001730.0225,303(174,197.35)174Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas II"1"04369001740.0245,903(190,997.35)175Pasang Jalusi Kusen Kayu Klas II"1"03440001750.0180,600(163,400.00)176Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku"1"07587001760.0631,215(127,485.00)177Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm"1"02656001770.0171,895(93,705.00)178Pasang Rolling Door"1"011186001780.0618,560(500,040.00)179Pasang Pintu Lipat (Folding Door)"1"05846001790.0494,660(89,940.00)180Pasang Pintu Sunscreen Alluminium"1"01773001800.0ERROR:#NUM!ERROR:#NUM!181Pasang Pintu Rolling Door Alluminium"1"04238001810.0301,500(122,300.00)182Pasang Kusen Pintu Alluminium"1"01077001820.0109,3621,661.50183Pasang Pintu Alluminium Strip Lebar 8 cm"1"06850001830.0615,625(69,375.50)184Pasang Pintu Kaca Rangka Alluminium"1"03111001840.0279,833(31,267.50)185Pasang Venetions Blinds"1"01631001850.0119,580(43,520.00)186Pasang Vertikals Blinds"1"01631001860.0119,580(43,520.00)187Pasang Terali Besi Strip (2x3) cm"1"05350001870.0264,194(270,805.54)188Pasang Kawat Nyamuk"1"0471001880.019,834(27,266.26)189Pasang Jendela Nako & Tralis"1"02663001890.0155,760(110,540.00)

HAnalisa Biaya Konstruksi Pekerjaan Kunci Dan Kaca190 Pasang Kunci Tanam AntikBh2397001900.0177,680(62,020.00)191 Pasang Kunci Tanam BiasaBh1145001910.0117,1902,690.00192 Pasang Kunci Tanam amar MandiBh1085001920.071,900(36,600.00)193Pasang Kunci SilinderBh1415001930.0166,90025,400.00194Pasang Engsel PintuBh450001940.021,920(23,080.00)195Pasang Engsel Jendela Kupu-kupuBh234001950.016,280(7,120.00)196Pasang Engsel AnginBh424001960.020,850(21,550.00)197Pasang Spring KnipBh846001970.0ERROR:#NUM!ERROR:#NUM!198Pasang Kait AnginBh296001980.014,420(15,180.00)199Pasang Door CloserBh733001990.041,400(31,900.00)200Pasang Kunci SelotBh414002000.027,560(13,840.00)201Pasang Pegangan Pintu / Door HolderBh733002010.041,400(31,900.00)202Pasang Door StopBh179002020.016,280(1,620.00)203Pasang Rel Pintu dorongBh1847002030.0ERROR:#NUM!ERROR:#NUM!204Pasang Kunci LemariBh443002040.023,700(20,600.00)205Pasang Kaca, Tebal 3 mm"1"0791002050.058,920(20,180.00)206Pasang Kaca, Tebal 5 mm"1"01154002060.069,920(45,480.00)207Pasang Kaca Buram, Tebal 12 mm"1"01527002070.0126,950(25,750.00)208Pasang Kaca Cermin, Tebal 12 mm"1"01699002080.0146,920(22,980.00)209Pasang Kaca Cermin, Tebal 6 mm"1"01033002090.086,420(16,880.00)210Pasang Kaca Cermin, Tebal 8 mm"1"01234002100.0103,858(19,542.50)211Pasang Kaca "Wireglass", Tebal 5 mm"1"0931002110.076,358(16,742.50)212Pasang Kaca Patri, Tebal 5 mm"1"0871002120.070,858(16,242.50)

IAnalisa Biaya Konstruksi Pekerjaan Atap213Pasang Rangka Kuda-kuda Baja IWFKg176002130.013,443(4,157.00)214Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II"1"051037002140.03,296,800(1,806,900.00)215Pasang Konstruksi Kuda-kuda Expose Kayu Klas I"1"074604002150.05,525,800(1,934,600.00)216Pasang Konstruksi Gording Kayu Klas II"1"043655002160.02,913,400(1,452,100.00)217Pasang Rangka Atap Genteng Keramik Kayu Klas II"1"01611002170.097,600(63,500.00)218Pasang Rangka Atap Genteng Beton Kayu Klas II"1"02189002180.0131,200(87,700.00)219Pasang Rangka Atap Sirap Kayu Klas II"1"04808002190.0344,780(136,020.00)220Pasangan Rangka Atap SengM2316002200.017,500(14,100.00)221Pasang Atap Genteng Palentong Kecil"1"014176002210.01,279,648(137,952.50)222Pasang Atap Genteng Kodok / Glazzur"1"014176002220.01,279,648(137,952.50)223Pasang Atap Genteng Palentong Super / Besar"1"06918002230.0619,898(71,902.50)224Pasang Genteng Bubung Palentong"1"01972002240.0153,100(44,100.00)225Pasang Bubung Genteng Kodok Glazzur"1"01972002250.0153,100(44,100.00)226Pasang Bubung Genteng Palentong Besar"1"01719002260.0130,100(41,800.00)227Pasang Atap Fiber (180 x 90) cm"1"0660002270.0ERROR:#N/AERROR:#N/A228Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm"1"0434002280.030,751(12,649.17)229Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm"1"0444002290.031,668(12,732.50)230Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm"1"0383002300.028,535(9,765.00)231Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm"1"0427002310.029,580(13,120.36)232Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm"1"0471002320.034,435(12,665.00)233Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm"1"0415002330.029,360(12,140.00)234Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm"1"0400002340.028,048(11,952.50)235Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm"1"0405002350.028,580(11,920.00)236Pasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm"1"0437002360.030,592(13,108.21)237Pasang Atap Asbes Gelombang (3,00 x 1,08m) x 6 mm"1"0408002370.028,836(11,964.17)238Pasang Atap Asbes Gelombang (2,70 x 1,08m) x 6 mm"1"0394002380.027,553(11,847.50)239Pasang Atap Asbes Gelombang (2,4 x 1,08m) x 6 mm"1"0400002390.028,744(11,255.83)240Pasang Atap Asbes Gelombang (2,1 x 1,08m) x 6 mm"1"0395002400.027,598(11,901.67)241Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm"1"0372002410.027,553(9,647.50)242Pasang Bubung Stel Gelombang 0,92"1"0872002420.067,685(19,514.64)243Pasang Non Stek Gelombang 1,05 m"1"0756002430.059,843(15,757.50)244Pasang Non Stek Gelombang 1,08 m"1"0744002440.058,693(15,707.50)245Pasang Nok Paten 0,92 m"1"0529002450.039,143(13,757.50)246Pasang Nok Paten 1,05 m"1"0529002460.039,143(13,757.50)247Pasang Nok Paten 1,08 m"1"0529002470.039,143(13,757.50)248Pasang Nok Stel Rata 0,92 m"1"0543002480.038,795(15,505.00)249Pasang Nok Stel Rata 1,05 m"1"0503002490.036,843(13,457.50)250Pasang Atap Genteng Beton"1"06436002500.0573,090(70,510.00)251Pasang Atap Genteng Aspal"1"07482002510.0391,170(357,030.00)252Pasang Atap Genteng Metal"1"01218002520.068,815(52,985.00)253Pasang Atap Sirap"1"033962002530.03,069,545(326,655.00)254Pasang Nok Genteng Beton"1"01812002540.0125,228(55,972.00)255Pasang Nok Genteng Aspal"1"02556002550.0129,185(126,415.00)256Pasang Nok Genteng Metal"1"01016002560.076,080(25,520.00)257Pasang Nok Sirap"1"0908002570.050,475(40,325.00)258Pasang Atap Seng Gelombang"1"0601002580.031,525(28,575.00)259Pasang Atap Nok Seng"1"0440002590.026,545(17,455.00)260Pasang Atap Alluminium"1"01561002600.0ERROR:#NUM!ERROR:#NUM!261Pasang Nok Alluminium"1"01460002610.085,940(60,060.00)262Pasang Alluminium Foll / Sisalation"1"0825002620.0ERROR:#NUM!ERROR:#NUM!263Pasang Lesplank Ukuran (3 x 20) cm, Kayu Klas II"1"0696002630.039,200(30,400.00)264Pasang Lesplank Ukuran (3 x 30) cm, Kayu Klas II"1"0689002640.038,650(30,250.00)265Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm"1"02037002650.0124,435(79,265.00)266Pasang Talang Lingkaran D15 cmSeng Bjls 30 Lebar 45 cm"1"01309002660.084,235(46,665.00)267Pasang Talang Miring, Seng Bjls 28"1"01533002670.093,135(60,165.00)268Memasang Rangka Atap Baja Ringan"1"0232291269Memasang Rangka Atap Konsul Baja Ringan"1"0163846268

JAnalisa Biaya Konstruksi Pekerjaan Langit-langit 270Pasang Rangka Langit-langit (50 x 100) cm, Kayu Klas II"1"094500269(1)56,985(37,515.00)271Pasang Rangka Langit-langit (60 x 60) cm, Kayu Klas II"1"0100400270(1)60,370(40,030.00)272Langit-langit Asbes Tebal 6 mm"1"053300271(1)44,045(9,255.00)273Langit-langit Asbes Tebal 5 mm"1"050200272(1)41,295(8,905.00)274Langit-langit Asbes Tebal 4 mm"1"053300273(1)44,045(9,255.00)275Langit-langit Akustik (30 x 30) cm"1"0217900274(1)190,250(27,650.00)276Langit-langit Akustik (30 x 60) cm"1"0135800275(1)120,355(15,445.00)277Langit-langit Akustik (60 x 120) cm"1"0140200276(1)124,355(15,845.00)278Langit-langit Plywood (120 x 240) cm, Tebal 4 mm"1"047100277(1)35,530(11,570.00)279Langit-langit Lamberziring Kayu, Tebal 9 mm"1"0192100278(1)101,110(90,990.00)280Langit-langit Gypsum Board (120 x 240), Tebal 9 mm"1"066500279(1)54,485(12,015.00)281Langit-langit Akustik (60 x 120) cm Rangka Allumunium"1"0463000280(1)387,480(75,520.00)282Langit-langit Kayu Profil"1"015200281(1)10,323(4,877.00)

KAnalisa Biaya Konstruksi Pekerjaan Sanitasi 283Memasang Kloset Duduk / MonoblokBh958700282(1)570,410(388,290.00)284Memasang Kloset Duduk OtomatisBh2328800283(1)ERROR:#N/AERROR:#N/A285Memasang Kloset Jongkok PorselenBh640400284(1)438,250(202,150.00)286Memasang Kloset Jongkok TerasoBh505100285(1)354,775(150,325.00)287Memasang UrinoirBh1148900286(1)696,900(452,000.00)288Memasang WastafelBh1120200287(1)817,685(302,515.00)289Memasang Bak Mandi Teraso Volume 0,30 m3Bh512700288(1)217,400(295,300.00)290Memasang Bak Mandi Fiberglass Volume 0,30 m3Bh938700289(1)459,250(479,450.00)291Memasang Bak Mandi Batu Bata Volume 0,30 m3Bh1551700290(1)925,105(626,594.74)292Memasang Badkip PorselenBh123100291(1)ERROR:#NUM!ERROR:#NUM!293Memasang Bak Fiberglass Volume 1 m3 AirBh1291600292(1)660,250(631,350.00)294Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm"1"082800293(1)70,643(12,157.00)295Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm"1"0104400294(1)88,737(15,663.00)296Memasang Pipa Beton, Diameter 15 - 20 cmBh101800295(1)75,264(26,535.98)297Memasang Pipa Beton, Diameter 30 - 100 cmBh613800296(1)329,388(284,412.27)298Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cmBh573200297(1)319,340(253,860.14)299Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cmBh510600298(1)315,828(194,771.71)300Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cmBh780000299(1)483,353(296,646.71)301Memasang Pipa Galvanis Diameter 1/2""1"037100300(1)29,295(7,805.00)302Memasang Pipa Galvanis Diameter 3/4""1"042300301(1)33,345(8,955.00)303Memasang Pipa Galvanis Diameter 1""1"049900302(1)49,545(355.00)304Memasang Pipa Galvanis Diameter 1 1/2""1"076600303(1)67,824(8,776.00)305Memasang Pipa Galvanis Diameter 3""1"0113200304(1)109,944(3,256.00)306Memasang Pipa Galvanis Diameter 4""1"0153700305(1)207,70154,000.50307Memasang Pipa PVC Tipe AW Diameter 1/2""1"017600306(1)13,968(3,632.00)308Memasang Pipa PVC Tipe AW Diameter 3/4""1"019000307(1)15,183(3,817.00)309Memasang Pipa PVC Tipe AW Diameter 1""1"020800308(1)17,208(3,592.00)310Memasang Pipa PVC Tipe AW Diameter 1 1/2""1"023400309(1)19,233(4,167.00)311Memasang Pipa PVC Tipe AW Diameter 2""1"032100310(1)29,862(2,238.00)312Memasang Pipa PVC Tipe AW Diameter 2 1/2""1"032300311(1)37,4585,158.00313Memasang Pipa PVC Tipe AW Diameter 3""1"051900312(1)55,9344,033.50314Memasang Pipa PVC Tipe AW Diameter 4""1"063900313(1)80,23416,333.50315Memasang Bak Cuci Piring Stainles SteelBh262800314(1)231,340(31,460.00)316Memasang Bak Cuci Piring TerasoBh368100315(1)302,400(65,700.00)317Memasang Kran Diameter 3/4" Atau 1/2"Bh40500316(1)16,600(23,900.00)318Memasang Floor DrainBh65200317(1)16,550(48,650.00)319Bak KontrolBH844900318(1)525,127(319,773.35)320Pekerjaan Septictank Kap. 50 OrangBH9699000319(1)946,250(8,752,750.00)321Pekerjaan Septictank Kap. 25 OrangBH6573400320(1)901,250(5,672,150.00)322Pekerjaan Septictank Kap. 15 OrangBH3296300321(1)751,250(2,545,050.00)

LAnalisa Biaya Konstruksi Pekerjaan Besi323Pasang Besi ProfilKg17600322(1)13,443(4,157.00)324Pekerjaan PerakitanKg72900323(1)581(72,319.30)325Pengelasan Dengan ListrikCM2800324(1)1,787(1,013.00)326Pasang Kawat Harmonika"1"046900325(1)35,760(11,140.00)327Pasang Kawat Kassa"1"046900326(1)24,760(22,140.00)328Pasang Kawat Burung"1"043300327(1)30,260(13,040.00)

MAnalisa Biaya Konstruksi Pekerjaan Penutup Dinding dan Lantai329Pasang Lantai Paving BlockM2105100328(1)69,950(35,150.00)330Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm"1"0220200329(1)175,388(44,812.00)331Pasang Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm"1"0136900330(1)104,343(32,557.50)332Pasang Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm"1"099500331(1)ERROR:#N/AERROR:#N/A333Pasang Lantai Ubin Warna Ukuran 40 x 40 cm"1"0227400332(1)178,313(49,087.00)334Pasang Lantai Ubin Warna Ukuran 30 x 30 cm"1"0145200333(1)107,718(37,482.50)335Pasang Lantai Ubin Warna Ukuran 20 x 20 cm"1"0ERROR:#N/A334(1)ERROR:#N/AERROR:#N/A336Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm"1"0227400335(1)178,313(49,087.00)337Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm"1"0145200336(1)107,718(37,482.50)338Pasang Lantai Ubin Granito Ukuran 40 x 40 cm"1"0227400337(1)178,313(49,087.00)339Pasang Lantai Ubin Granito Ukuran 30 x 30 cm"1"0181100338(1)137,986(43,114.00)340Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm"1"0227500339(1)178,373(49,127.00)341Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm"1"0145200340(1)107,718(37,482.50)342Pasang Lantai Keramik Ukuran 60 x 60 cm Granito"1"0263700341(1)ERROR:#N/AERROR:#N/A343Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm"1"0227400342(1)178,313(49,087.00)344Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm"1"0145200343(1)107,718(37,482.50)345Pasang Plint Ubin PC Abu-abu Ukuran 15 x 20 cm"1"0ERROR:#N/A344(1)ERROR:#N/AERROR:#N/A346Pasang Plint Ubin PC Abu-abu Ukuran 10 x 30 cm"1"0ERROR:#N/A345(1)ERROR:#N/AERROR:#N/A347Pasang Plint Ubin PC Abu-abu Ukuran 10 x 40 cm"1"0ERROR:#N/A346(1)ERROR:#N/AERROR:#N/A348Pasang Plint Ubin PC Warna Ukuran 10 x 20 cm"1"0ERROR:#N/A347(1)ERROR:#N/AERROR:#N/A349Pasang Plint Ubin PC Warna Ukuran 10 x 30 cm"1"0ERROR:#N/A348(1)ERROR:#N/AERROR:#N/A350Pasang Plint Ubin PC Warna Ukuran 10 x 40 cm"1"0ERROR:#N/A349(1)ERROR:#N/AERROR:#N/A351Pasang Plint Ubin Teraso Ukuran 10 x 30 cm"1"0ERROR:#N/A350(1)ERROR:#N/AERROR:#N/A352Pasang Plint Ubin Teraso Ukuran 10 x 40 cm"1"0ERROR:#N/A351(1)ERROR:#N/AERROR:#N/A353Pasang Plint Ubin Granito Ukuran 10 x 40 cm"1"0ERROR:#N/A352(1)ERROR:#N/AERROR:#N/A354Pasang Plint Ubin Granito Ukuran 10 x 30 cm"1"0ERROR:#N/A353(1)ERROR:#N/AERROR:#N/A355Pasang Plint Ubin Teralux Kerang Ukuran 10 x 40 cm"1"0ERROR:#N/A354(1)ERROR:#N/AERROR:#N/A356Pasang Plint Ubin Teralux Kerang Ukuran 10 x 30 cm"1"0ERROR:#N/A355(1)ERROR:#N/AERROR:#N/A357Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm"1"0ERROR:#N/A356(1)ERROR:#N/AERROR:#N/A358Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm"1"0ERROR:#N/A357(1)ERROR:#N/AERROR:#N/A359Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm"1"0ERROR:#N/A358(1)ERROR:#N/AERROR:#N/A360Pasang Teraso Cor Ditempat Tebal 3 cm"1"0ERROR:#N/A359(1)ERROR:#N/AERROR:#N/A361Pasang Lantai Keramik Artistik 10 x 20 cm"1"0ERROR:#N/A360(1)ERROR:#N/AERROR:#N/A362Pasang Lantai Keramik Artistik 10 x 10 cm"1"0ERROR:#N/A361(1)ERROR:#N/AERROR:#N/A363Pasang Lantai Keramik Artistik 5 x 20 cm"1"0183700362(1)1,197,5511,013,850.67364Pasang Lantai Keramik 33 x 33 cm"1"0188500363(1)123,329(65,171.00)365Pasang Lantai Keramik 30 x 30 cm"1"0193300364(1)104,577(88,722.90)366Pasang Lantai Keramik 40 x 40 cm"1"0200200365(1)ERROR:#N/AERROR:#N/A367Pasang Lantai Keramik 20 x 20 cm"1"0184000366(1)112,400(71,600.00)368Pasang Lantai Keramik 10 x 33 cm, variasi/border"1"0ERROR:#N/A367(1)ERROR:#N/AERROR:#N/A369Pasang Lantai Mosaik 30 x 30 cm, Camp. 1PC : 3PP"1"0184400368(1)117,740(66,660.00)370Pasang Plint Keramik Artistik 10 x 20 cm"1"025800369(1)15,485(10,314.75)371Pasang Plint Keramik Artistik 10 x 10 cm"1"030000370(1)19,252(10,748.50)372Pasang Plint Keramik Artistik 5 x 20 cm"1"022100371(1)12,326(9,773.75)373Internal Cove Artistik (5 x 5 x 20) cm"1"0138300372(1)76,224(62,076.00)374Pasang Lantai Marmer (100 x 100) cm"1"0ERROR:#N/A373(1)ERROR:#N/AERROR:#N/A375Pasang Lantai Karpet"1"057800374(1)73,28515,485.00376Pasang Underlyer, Tebal 6 mm"1"0108100375(1)86,555(21,545.00)377Pasang Lantai Parquet"1"0148100376(1)91,205(56,895.00)378Pasang Lantai Kayu (Gymfloor)"1"0149300377(1)91,805(57,495.00)379Pasang Dinding Porselin 11 x 11 cm"1"0177800378(1)108,357(69,443.40)380Pasang Dinding Porselin 10 x 20 cm"1"0185600379(1)115,033(70,567.50)381Pasang Dinding Porselin 20 x 20 cm"1"0184100380(1)115,860(68,240.00)382Pasang Dinding Keramik Artistik 10 x 20 cm"1"0188500381(1)116,381(72,119.50)383Pasang Dinding Keramik Artistik 5 x 20 cm"1"0189400382(1)116,718(72,682.00)384Pasang Dinding Keramik 10 x 20 cm"1"0188500383(1)116,381(72,119.50)385Pasang Dinding Keramik 20 x 20 cm"1"0189900384(1)114,558(75,342.00)386Pasang Dinding Marmer 100 x 100 cm"1"0ERROR:#N/A385(1)ERROR:#N/AERROR:#N/A387Pasang Dinding Bata Pelapis 7 x 3 x 24 cm"1"0207000386(1)113,405(93,595.10)388Pasang Dinding Batu Paros "1"0118000387(1)61,925(56,075.00)389Pasang Dinding Batu Tempel Hitam"1"0118000388(1)61,925(56,075.00)390Pasang Lantai Vinyl Karet 30 x 30 cm Klas I"1"075500389(1)54,365(21,135.00)391Pasang Wallpaper Lebar 50 cm"1"0137600390(1)81,525(56,075.00)392Floor Hardener"1"0106900391(1)87,180(19,720.00)393Pasang Lantai Vinyl Karet 30 x 30 cm dengan lem"1"023400392(1)14,200(9,200.00)394Pasang Plint Kayu Klas II Ukuran 2 x 10 cm"1"034300393(1)18,185(16,115.00)395Pasang Lantai Vinyl Motif Kembang 30 x 30 cm"1"072800394(1)51,875(20,925.00)

NAnalisa Biaya Konstruksi Pekerjaan Pengecatan396Mengikis / Mengorek Permukaan Cat Tembok Lama"1"015400395(1)6,400(9,000.00)397Mencuci Bidang Permukaan Tembok Yang Pernah Di Cat"1"013200396(1)6,650(6,550.00)398Mengorek Karat Cat Lama Permukaan Baja Dengan Cara Manual"1"013200397(1)6,650(6,550.00)399Menyabun Permukaan Tembok Lama"1"013200398(1)6,650(6,550.00)400Mengorek Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir (Sanblasting) Dengan ingkat Kebersihan sa 2 1/2 "1"0491800399(1)262,633(229,166.67)401Mendempul Dan Menggosok Kayu"1"09800400(1)6,260(3,540.00)402Pengecatan Bidang Kayu Lama"1"028900401(1)18,083(10,817.50)403Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup"1"037600402(1)25,048(12,552.50)404Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup"1"044800403(1)29,878(14,922.50)405Pelaburan Bidang Kayu Dengan Teak Oil"1"025200404(1)16,038(9,162.50)406Pelaburan Bidang Kayu Dengan Politur"1"038000405(1)22,670(15,330.00)407Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter"1"012700406(1)7,510(5,190.00)408Pelaburan Bidang Kayu dengan Vernis"1"036300407(1)20,615(15,685.00)409Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)"1"019000408(1)11,916(7,084.50)410Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)"1"014100409(1)8,767(5,333.00)411Melabur Tembok Dengan Kalkarium"1"09600410(1)5,727(3,873.00)412Melabur Tembok Dengan Kapur Sirih"1"042600411(1)10,326(32,274.31)413Melabur Tembok Lama Dengan Kapur Sirih (Untuk Pemeliharaan)"1"057600412(1)5,327(52,273.13)414Pemasangan Wall Paper"1"041700413(1)28,570(13,130.00)415Pengecatan Permukaan Baja Dengan Meni Besi"1"028500414(1)14,580(13,920.00)416Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah"1"054100415(1)28,293(25,807.50)417Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 Lapis Cat Konvensional Dengan Tebal 200 um"1"015700416(1)12,240(3,460.00)418Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um"1"023600417(1)16,020(7,580.00)419Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 Lapis Cat Konvensional Dengan Tebal 200 um"1"0207400418(1)113,620(93,780.00)420Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Dengan Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um"1"0156700419(1)81,250(75,450.00)

AnalisaDAFTAR ANALISA HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNANDINAS PEKERJAAN UMUMKOTA PADANG PANJANG tahun anggaran 2014

NOURAIANH. SATUANUPAHBAHANPEKERJAANAAnalisa Biaya Konstruksi Pekerjaan Persiapan11"1"0Pagar Sementara Dari Kayu (T. 2M)Dibulatkan2258000.0200OHMandor10000020000.0200OHKepala Tukang10300020600.2000OHTukang Kayu95000190000.4000OHPekerja75000300001.2500BtgKayu Dolken 8-10/400 cm20000250002.5000KgSemen Portland130032500.0050M3Pasir Beton1400007000.0090M3Kerikil Beton15000013500.0720M3Kayu 5/7 Klas IV16000001152000.0600KgPaku 5 cm - 10 cm120007200.4000KgResidu15000600053060152220205280Overhead 10 % ..20528Jumlah ..22580821"1"0Pagar Sementara Dari Seng Gelombang (T.2M)Dibulatkan2831000.0200OHMandor10000020000.0200OHKepala Tukang10300020600.2000OHTukang Kayu95000190000.4000OHPekerja75000300001.2500BtgKayu Dolken 8-10/400 cm20000250002.5000KgSemen Portland130032501.2000LbrSeng Gelombang 3" x 5"40000480000.0050M3Pasir Beton1400007000.0090M3Kerikil Beton15000013500.0720M3Kayu 5/7 Klas IV16000001152000.0600KgPaku 5 cm - 10 cm120007200.4500KgMeni Besi225001012553060204345257405Overhead 10 % ..25740Jumlah ..28314631"1"0Pagar Sementara Dari Kawat Duri (T.1,8M)Dibulatkan4080000.0200OHMandor10000020000.0200OHKepala Tukang10300020600.2000OHTukang Kayu95000190000.3000OHPekerja75000225001.0000BtgKayu Dolken 8-10/400 cm20000200002.0000KgSemen Portland1300260025.0000KgKawat Duri120003000000.0050M3Pasir Beton1400007000.0090M3Kerikil Beton15000013500.0600KgPaku 5 cm - 10 cm1200072045560325370370930Overhead 10 % ..37093Jumlah ..40802341"1"0Pengukuran dan Pemasangan BouwplankDibulatkan610000.0050OHMandor1000005000.0100OHKepala Tukang10300010300.1000OHTukang Kayu9500095000.1000OHPekerja7500075000.0120M3Kayu 5/7 Klas IV1600000192000.0200KgPaku 5 cm - 10 cm120002400.0070M3Kayu Klas III Papan 250000017500185303694055470Overhead 10 % ..5547Jumlah ..6101751"1"0Pembuatan Kantor Sementara dengan Lantai PlesteranDibulatkan12498000.0500OHMandor10000050000.3000OHKepala Tukang103000309002.0000OHTukang Kayu950001900001.0000OHTukang Batu95000950002.0000OHPekerja750001500001.2500BtgKayu Dolken 8-10/400 cm20000250000.1800M3Kayu25000004500000.8500KgPaku 5 cm - 10 cm12000102001.1000KgBesi Strip Tebal 5 mm150001650035.0000KgSemen Portland1300455000.1500M3Pasir Pasang140000210000.1000M3Pasir Beton140000140000.1500M3Kerikil Beton1500002250030.0000BhBatu Bata800240000.2500LbrSeng Plat46000115002.0000BhJendela Nako330066000.0800M2Kaca Tebal 5 mm8000064000.1500BhKunci Tanam Biasa5500082500.0600LbrPlywood Tebal 4 mm6500039004709006653501136250Overhead 10 % ..113625Jumlah ..124987561"1"0Pembuatan Gudang Semen dan Alat-alatDibulatkan10464000.0500OHMandor10000050000.2000OHKepala Tukang103000206002.0000OHTukang Kayu950001900001.0000OHPekerja75000750001.7000BtgKayu Dolken 8-10/400 cm20000340000.2100M3Kayu25000005250000.3000KgPaku 5 cm - 10 cm12000360010.5000KgSemen Portland1300136500.0300M3Pasir Beton14000042000.0500M3Kerikil Beton15000075001.5000LbrSeng Gelombang BJLS 304850072750290600660700951300Overhead 10 % ..95130Jumlah ..104643071"1"0Pembuatan Rumah Jaga / Konstruksi KayuDibulatkan11760000.0500OHMandor10000050000.1500OHKepala Tukang103000154501.5000OHTukang Kayu950001425001.0000OHPekerja75000750003.0000BtgKayu Dolken 8-10/400 cm20000600000.2760M3Kayu25000006900000.7000KgPaku 5 cm - 10 cm1200084001.5000LbrSeng Gelombang BJLS 3048500727502379508311501069100Overhead 10 % ..106910Jumlah ..117601081"1"0Membersihkan Lapangan dan PeralatanDibulatkan137000.0500OHMandor10000050000.1000OHPekerja750007500125000.012500Overhead 10 % ..1250Jumlah ..1375091"1"0Pembuatan Bedeng Buruh10777000.0500OHMandor10000050000.2000OHKepala Tukang103000206002.0000OHTukang Kayu950001900001.0000OHPekerja75000750001.2500BtgKayu Dolken 8-10/400 cm20000250000.1860M3Kayu25000004650000.3000KgPaku 5 cm - 10 cm12000360018.0000KgSemen Portland1300234000.0300M3Pasir Beton14000042000.0500M3Kerikil Beton15000075001.5000LbrSeng Gelombang BJLS 3048500727501.3500LbrPlywood Tebal 4 mm6500087750290600689200979800Overhead 10 % ..97980Jumlah ..1077780101"1"0Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cmDibulatkan1700000.0015OHMandor1000001500.3000OHTukang Kayu95000285000.0360M3Kayu Merantih2500000900000.0800KgPaku 5 cm - 10 cm120009601.0000BtgKayu 5/7 (btg) Klas IV350003500028650125960154610Overhead 10 % ..15461Jumlah ..170071111"1"0Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cmDibulatkan329000.0130OHMandor10000013000.0020OHKepala Tukang1030002060.0170OHTukang Kayu9500016150.2500OHPekerja75000187501.0000BtgBambu 6-8/600 cm500050000.2500KgTali Ijuk12500312521871812529996Overhead 10 % ..3000Jumlah ..32996121"1"0Pembuatan Jalan SementaraDibulatkan1311000.0500OHMandor10000050001.0000OHPekerja75000750000.1500M3Batu Kali157500236250.0900M3Batu Kali157500141750.0100M3Pasir Pasang14000014008000039200119200Overhead 10 % ..11920Jumlah ..131120131"1"0Bongkaran Beton Bertulang5866000.3330OHMandor100000333006.6670OHPekerja750005000255333250.0533325Overhead 10 % ..53332Jumlah ..586658141"1"0Bongkaran Dinding Tembok Batu BataDibulatkan5503000.0030OHMandor1000003006.6670OHPekerja750005000255003250.0500325Overhead 10 % ..50032Jumlah ..550358151M2Bongkaran Lantai BetonDibulatkan93000.1000OHPekerja7500075000.0100OHMandor100000100085000.08500Overhead 10 % ..850Jumlah ..9350161M2Mengupas Plesteran LamaDibulatkan440000.5000OHPekerja75000375000.0250OHMandor1000002500400000.040000Overhead 10 % ..4000Jumlah ..44000171M2Menurunkan Atap Genteng/SirapDibulatkan176000.2000OHPekerja75000150000.0100OHMandor1000001000160000.016000Overhead 10 % ..1600Jumlah ..17600181M2Bongkaran Atap SengDibulatkan56000.0500OHTukang Besi9500047500.0050OHPekerja7500037551250.05125Overhead 10 % ..512Jumlah ..5638191M2Bongkaran Rangka AtapDibulatkan116000.1000OHPekerja7500075000.0050OHMandor1000005000.0250OHTukang Kayu9500023750.0025OHKepala Tukang103000258106320.010632Overhead 10 % ..1063Jumlah ..11696201M2Bongkaran Loteng PapanDibulatkan245000.2000OHPekerja75000150000.0100OHMandor10000010000.0600OHTukang Kayu9500057000.0060OHKepala Tukang103000618223180.022318Overhead 10 % ..2232Jumlah ..24550211M3Bongkaran Kayu Kuda-KudaDibulatkan10469004.0000OHPekerja750003000000.2000OHMandor100000200006.0000OHTukang Kayu950005700000.6000OHKepala Tukang103000618009518000.0951800Overhead 10 % ..95180Jumlah ..1046980221M2Bongkaran Lantai KeramikDibulatkan176000.2000OHPekerja75000150000.0100OHMandor1000001000160000.016000Overhead 10 % ..1600Jumlah ..17600231M3Bongkaran PondasiDibulatkan3740004.0000OHPekerja750003000000.4000OHMandor100000400003400000.0340000Overhead 10 % ..34000Jumlah ..374000241M2Bongkaran KuzenDibulatkan245000.0600OHTukang Kayu9500057000.0060OHKepala Tukang1030006180.2000OHPekerja75000150000.0100OHMandor1000001000223180.022318Overhead 10 % ..2232Jumlah ..24550251M2Bongkaran JalanDibulatkan3740004.0000OHPekerja750003000000.4000OHMandor100000400003400000.0340000Overhead 10 % ..34000Jumlah ..374000261"1"0Pasang pagar kawat Jaring Galvanis (Tinggi 1 M)Dibulatkan849000.0020OHMandor1000002000.0040OHKepala Tukang1030004120.0420OHTukang Kayu9500039900.0420OHPekerja7500031500.4340LbrPagar kawat Jaring1600006944077526944077192Overhead 10 % ..7719Jumlah ..84911271"1"0Pasang Pagar Beton Pracetak (5 x 50 x 213) cmDibulatkan365300Luas1.065m20.0190OHMandor10000019000.0120OHKepala Tukang10300012360.1250OHTukang Batu95000118750.3750OHPekerja75000281250.9860LbrPanel Beton Pracetak358535351.08010.05400.5250BtgKolom Beton Pracetak3500001837500.0740M3Pasir Beton140000103600.1460M3Koral 2/32250003285045.0000KgSemen Abu-abu13005850043136288995332131Overhead 10 % ..33213Jumlah ..365344BAnalisa Biaya Konstruksi Pekerjaan Tanah281"1"0Galian Tanah Biasa Sedalam 1 meterDibulatkan646000.0250OHMandor10000025000.0250.02750.7500OHPekerja75000562500.750.8250587500.058750Overhead 10 % ..5875Jumlah ..64625291"1"0Galian Tanah Biasa Sedalam 2 meterDibulatkan792000.0450OHMandor10000045000.9000OHPekerja7500067500720000.072000Overhead 10 % ..7200Jumlah ..79200301"1"0Galian Tanah Biasa Sedalam 3 meterDibulatkan939000.0670OHMandor10000067001.0500OHPekerja7500078750854500.085450Overhead 10 % ..8545Jumlah ..93995311"1"0Galian Tanah Keras Sedalam 1 meterDibulatkan860000.0320OHMandor10000032001.0000OHPekerja7500075000782000.078200Overhead 10 % ..7820Jumlah ..86020321"1"0Galian Tanah Cadas Sedalam 1 meterDibulatkan1303000.0600OHMandor10000060001.5000OHPekerja750001125001185000.0118500Overhead 10 % ..11850Jumlah ..130350331"1"0Galian Tanah Lumpur Sedalam 1 meterDibulatkan1039000.0450OHMandor10000045001.2000OHPekerja7500090000945000.094500Overhead 10 % ..9450Jumlah ..103950341"1"0Pekerjaan Stripping Tebing Setinggi 1 MDibulatkan46000.0050OHMandor1000005000.0500OHPekerja75000375042500.04250Overhead 10 % ..425Jumlah ..4675351"1"0Pembuangan Tanah Sejauh 30 meterDibulatkan283000.0100OHMandor10000010000.3300OHPekerja7500024750257500.025750Overhead 10 % ..2575Jumlah ..28325361"1"0Urugan KembaliDibulatkan179000.0190OHMandor10000019000.1920OHPekerja7500014400163000.016300Overhead 10 % ..1630Jumlah ..17930371"1"0Pemadatan Tanah (per 20 cm)Dibulatkan467000.0500OHMandor10000050000.5000OHPekerja7500037500425000.042500Overhead 10 % ..4250Jumlah ..46750381"1"0Urugan PasirDibulatkan1116000.0100OHMandor10000010000.3000OHPekerja75000225001.2000M3Pasir Urug65000780002350078000101500Overhead 10 % ..10150Jumlah ..111650391"1"0Lapisan Pudel campuran 1 Kp : 3 Ps : 7 TLDibulatkan2047000.0800OHMandor10000080000.0400OHKepala Tukang10300041200.4000OHTukang Batu95000380000.8000OHPekerja75000600000.4000M3Pasir Urug65000260000.1350M3Kapur Padam125000168750.9480M3Tanah Liat350003318011012076055186175Overhead 10 % ..18618Jumlah ..204792401"1"0Lapisan Pudel Campuran 1 Kp : 5 TLDibulatkan2032000.0800OHMandor10000080000.0400OHKepala Tukang10300041200.4000OHTukang Batu95000380000.8000OHPekerja75000600000.2480M3Kapur Padam125000310001.2480M3Tanah Liat350004368011012074680184800Overhead 10 % ..18480Jumlah ..203280411"1"0Pemasangan Lapisan Ijuk Tebal 10 cmDibulatkan1130000.0150OHMandor10000015000.1500OHPekerja75000112506.0000KgIjuk15000900001275090000102750Overhead 10 % ..10275Jumlah ..113025421"1"0Urugan Sirtu Padat untuk peninggian lantai bangunanDibulatkan2081000.0250OHMandor10000025000.2500OHPekerja75000187501.2000M3Sirtu14000016800021250168000189250Overhead 10 % ..18925Jumlah ..208175CAnalisa Biaya Konstruksi Pekerjaan Pondasi431"1"0Pasang Pondasi Batu Kali, 1 Pc : 3 PsDibulatkan7729000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali157500189000202.0000KgSemen Portland13002626000.4850M3Pasir Pasang14000067900SNI 10%BOW183180519500702680Overhead 10 % ..70268Jumlah ..772948441"1"0Pasang Pondasi Batu Kali, 1 Pc : 4 PsDibulatkan7225002014985210707225684143604738508882100.0750OHMandor10000075000.18orgMandor0.0825(0.0975)1000008250180000.0600OHKepala Tukang10300061800.12orgKepala Tukang Batu0.0660(0.0540)1030006798123600.6000OHTukang Batu95000570001.2orgTukang Batu0.6600(0.5400)95000627001140001.5000OHPekerja750001125003.6orgPekerja1.6500(1.9500)750001237502700001.2000M3Batu Kali1575001890001.2m3Batu Kali1.32000.1200157500207900189000163.0000KgSemen Portland1300211900162.9kgSemen (50 kg)179.300016.400013002330902117700.5200M3Pasir Pasang140000728000.522m3Pasir Pasang0.57200.05001400008008073080183180473700656880Overhead 10 % ..65688Jumlah ..722568451"1"0Pasang Pondasi Batu Kali, 1 Pc : 5 PsDibulatkan6876007563600.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali157500189000136.0000KgSemen Portland13001768000.5440M3Pasir Pasang14000076160183180441960625140Overhead 10 % ..62514Jumlah ..687654461"1"0Pasang Pondasi Batu Kali, 1 Pc : 6 PsDibulatkan6631000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali157500189000117.0000KgSemen Portland13001521000.5610M3Pasir Pasang14000078540183180419640602820Overhead 10 % ..60282Jumlah ..663102471"1"0Pasang Pondasi Batu Kali, 1 Pc : 8 PsDibulatkan6259000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali15750018900091.0000KgSemen Portland13001183000.5610M3Pasir Pasang14000078540183180385840569020Overhead 10 % ..56902Jumlah ..625922481"1"0Pasang Pondasi Batu Kali, 1 Kp : 1 Sm : 2 PsDibulatkan6862000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali1575001890000.1700KgKapur Pasang281480.1700M3Semen Merah12000002040000.3400M3Pasir Pasang14000047600183180440648623828Overhead 10 % ..62383Jumlah ..686211491"1"0Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PsDibulatkan5724000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali15750018900061.0000KgSemen Portland1300793000.1470KgKapur Pasang281410.4920M3Pasir Pasang14000068880183180337221520401Overhead 10 % ..52040Jumlah ..572441501"1"0Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 PsDibulatkan5486000.0750OHMandor10000075000.0600OHKepala Tukang10300061800.6000OHTukang Batu95000570001.5000OHPekerja750001125001.2000M3Batu Kali15750018900041.0000KgSemen Portland1300533000.1310KgKapur Pasang281370.5230M3Pasir Pasang14000073220183180315557498737Overhead 10 % ..49874Jumlah ..548611511"1"0Pasang Pondasi Batu Kosong (Aanstampang)Dibulatkan3526000.0390OHMandor10000039000.0390OHKepala Tukang10300040170.3900OHTukang Batu95000370500.7800OHPekerja75000585001.2000M3Batu Kali1575001890000.4320M3Pasir Urug6500028080103467217080320547Overhead 10 % ..32055Jumlah ..352602521"1"0Pasang Pondasi Siklop 60 % Beton 1PC : 2PB : 3KRDibulatkan20422000.1500OHMandor100000150000.0850OHKepala Tukang10300087550.8500OHTukang Batu95000807503.0000OHPekerja75000225000126.0000KgBesi Beton Polos90001134000194.0000KgSemen Portland13002522000.3120M3Pasir Beton140000436800.4680M3Kerikil Beton150000702001.8000KgKawat Beton150002700032950515270801856585Overhead 10 % ..185658Jumlah ..2042244531"1"0Pasang Pondasi Sumuran Diameter 100 cmDibulatkan7205000.0800OHMandor10000080000.0300OHKepala Tukang10300030900.3000OHTukang Batu95000285002.3800OHPekerja750001785000.4500M3Batu Kali15750070875194.0000KgSemen Portland13002522000.3120M3Pasir Beton140000436800.4680M3Kerikil Beton15000070200218090436955655045Overhead 10 % ..65504Jumlah ..720550541BHPekerjaan Cincin Sumuran Dia. 1 m'Dibulatkan3496000.3500"1"0Pekerjaan Beton K 2258294552903090.2075"1"0Pasang Bekisting untuk Pondasi133000275980.0317907317907Overhead 10 % ..31791Jumlah ..349697551BHPekerjaan Cincin Sumuran Dia. 1,2 m'Dibulatkan4646000.5000"1"0Pekerjaan Beton K 2258294554147270.0575"1"0Pasang Bekisting untuk Pondasi13300076480.0422375422375Overhead 10 % ..42237Jumlah ..464612561BHMenurunkan Cincin Sumuran Sedalam 1 MDibulatkan1386000.7500OHPekerja1.250x75000703120.0250OHMandor1.250x10000031250.5000OHTukang Batu95000475000.0500OHKepala Tukang10300051501260880.0126088Overhead 10 % ..12609Jumlah ..138696571BHMenurunkan Cincin Sumuran Sedalam 2 MDibulatkan1548000.7500OHPekerja1.500x75000843750.0250OHMandor1.500x10000037500.5000OHTukang Batu95000475000.0500OHKepala Tukang10300051501407750.0140775Overhead 10 % ..14078Jumlah ..154852581BHMenurunkan Cincin Sumuran Sedalam 3 MDibulatkan1871000.7500OHPekerja2.000x750001125000.0250OHMandor2.000x10000050000.5000OHTukang Batu95000475000.0500OHKepala Tukang10300051501701500.0170150Overhead 10 % ..17015Jumlah ..187165591M3Campuran Batu Kali + Stamp Beton 1:2:3Dibulatkan6184001.2000M3Batu Kali1575001890000.4500"1"0Pekerjaan Beton K 2258294553732550.0562255562255Overhead 10 % ..56225Jumlah ..618480601M3Cyclopen Beton 1:2:3 + 40 % Batu KaliDibulatkan7948000.6000"1"0Pekerjaan Beton K 2258294554976730.4000M3Campuran Batu Kali + Stamp Beton 1:2:35621822248730.0722545722545Overhead 10 % ..72255Jumlah ..794800611TTKPekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1 MDibulatkan11121001.0000BHPekerjaan Cincin Sumuran Dia. 1 m'3178183178181.0000BHMenurunkan Cincin Sumuran Sedalam 1 M1260001260000.7850M3Cyclopen Beton 1:2:3 + 40 % Batu Kali7225455671961260008850141011014Overhead 10 % ..101101Jumlah ..1112116621TTKPekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2 MDibulatkan21018002.0000BHPekerjaan Cincin Sumuran Dia. 1 m'3178186356361.0000BHMenurunkan Cincin Sumuran Sedalam 2 M1407271407271.5700M3Cyclopen Beton 1:2:3 + 40 % Batu Kali722545113439614072717700331910760Overhead 10 % ..191076Jumlah ..2101836631TTKPekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3 MDibulatkan31076003.0000BHPekerjaan Cincin Sumuran Dia. 1 m'3178189534551.0000BHMenurunkan Cincin Sumuran Sedalam 3 M1700911700912.3550M3Cyclopen Beton 1:2:3 + 40 % Batu Kali722545170159517009126550492825140Overhead 10 % ..282514Jumlah ..3107654641TTKPekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 1 MDibulatkan15016001.0000BHPekerjaan Cincin Sumuran Dia. 1,2 m'4223644223641.0000BHMenurunkan Cincin Sumuran Sedalam 1 M1260001260001.1304M3Cyclopen Beton 1:2:3 + 40 % Batu Kali72254581676512600012391291365129Overhead 10 % ..136513Jumlah ..1501642651TTKPekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 2 MDibulatkan28808002.0000BHPekerjaan Cincin Sumuran Dia. 1,2 m'4223648447271.0000BHMenurunkan Cincin Sumuran Sedalam 2 M1407271407272.2608M3Cyclopen Beton 1:2:3 + 40 % Batu Kali722545163353114072724782582618985Overhead 10 % ..261899Jumlah ..2880884661TTKPekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 3 MDibulatkan42762003.0000BHPekerjaan Cincin Sumuran Dia. 1,2 m'42236412670911.0000BHMenurunkan Cincin Sumuran Sedalam 3 M1700911700913.3912M3Cyclopen Beton 1:2:3 + 40 % Batu Kali722545245029617009137173873887478Overhead 10 % ..388748Jumlah ..4276226DAnalisa Biaya Konstruksi Pekerjaan Beton671"1"0Pekerjaan Beton K 100Dibulatkan7480000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750247.0000KgSemen Portland1300321100869.0000KgPasir Beton (kg)10086900999.0000KgKerikil Beton (kg)111111000161059519000680059Overhead 10 % ..68006Jumlah ..748065681"1"0Pekerjaan Beton K 125Dibulatkan7866000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750276.0000KgSemen Portland1300358800828.0000KgPasir Beton (kg)100828001,012.0000KgKerikil Beton (kg)111112444161059554044715103Overhead 10 % ..71510Jumlah ..786614691"1"0Pekerjaan Beton K 150Dibulatkan8169000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750299.0000KgSemen Portland1300388700799.0000KgPasir Beton (kg)100799001,017.0000KgKerikil Beton (kg)111113000161059581600742659Overhead 10 % ..74266Jumlah ..816925701"1"0Pekerjaan Beton K 100 Lantai KerjaDibulatkan6814000.0600OHMandor10000060000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190001.2000OHPekerja7500090000230.0000KgSemen Portland1300299000893.0000KgPasir Beton (kg)100893001,027.0000KgKerikil Beton (kg)111114111117060502411619471Overhead 10 % ..61947Jumlah ..681418711"1"0Pekerjaan Beton K 175Dibulatkan8527000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750326.0000KgSemen Portland1300423800760.0000KgPasir Beton (kg)100760001,029.0000KgKerikil Beton (kg)111114333161059614133775192Overhead 10 % ..77519Jumlah ..852712721"1"0Pekerjaan Beton K 200Dibulatkan8869000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750352.0000KgSemen Portland1300457600731.0000KgPasir Beton (kg)100731001,031.0000KgKerikil Beton (kg)111114556161059645256806315Overhead 10 % ..80631Jumlah ..886946731"1"0Pekerjaan Beton K 225Dibulatkan9124000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750371.0000KgSemen Portland1300482300698.0000KgPasir Beton (kg)100698001,047.0000KgKerikil Beton (kg)111116333161059668433829492Overhead 10 % ..82949Jumlah ..912442741"1"0Pekerjaan Beton K 250Dibulatkan9293000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750384.0000KgSemen Portland1300499200692.0000KgPasir Beton (kg)100692001,039.0000KgKerikil Beton (kg)111115444161059683844844903Overhead 10 % ..84490Jumlah ..929394751"1"0Pekerjaan Beton K 275Dibulatkan9583000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750406.0000KgSemen Portland1300527800684.0000KgPasir Beton (kg)100684001,026.0000KgKerikil Beton (kg)111114000161059710200871259Overhead 10 % ..87126Jumlah ..958385761"1"0Pekerjaan Beton K 300Dibulatkan9674000.0830OHMandor10000083000.0280OHKepala Tukang10300028840.2750OHTukang Batu95000261251.6500OHPekerja75000123750413.0000KgSemen Portland1300536900681.0000KgPasir Beton (kg)100681001,021.0000KgKerikil Beton (kg)111113444161059718444879503Overhead 10 % ..87950Jumlah ..967454771"1"0Pekerjaan Beton K 325Dibulatkan10497000.1050OHMandor100000105000.0350OHKepala Tukang10300036050.3500OHTukang Batu95000332502.1000OHPekerja75000157500439.0000KgSemen Portland1300570700670.0000KgPasir Beton (kg)100670001,006.0000KgKerikil Beton (kg)111111778204855749478954333Overhead 10 % ..95433Jumlah ..1049766781"1"0Pekerjaan Beton K 350Dibulatkan10497000.1050OHMandor100000105000.0350OHKepala Tukang10300036050.3500OHTukang Batu95000332502.1000OHPekerja75000157500439.0000KgSemen Portland1300570700670.0000KgPasir Beton (kg)100670001,006.0000KgKerikil Beton (kg)111111778204855749478954333Overhead 10 % ..95433Jumlah ..1049766791"1"0Membuat Beton Kedap Air Dengan Stronox - 100Dibulatkan10164000.1050OHMandor100000105000.0350OHKepala Tukang10300036050.3500OHTukang Batu95000332502.1000OHPekerja75000157500400.0000KgSemen Portland13005200000.4800M3Pasir Beton140000672000.8000M3Kerikil Beton1500001200001.2000KgStronox - 1001000012000204855719200924055Overhead 10 % ..92406Jumlah ..1016460801"1"0Memasang PVC Waterstop Lebar 150 mmDibulatkan1820000.0030OHMandor1000003000.0030OHKepala Tukang1030003090.0300OHTukang Batu9500028500.0600OHPekerja7500045001.0500M1Waterstop Lebar 150 mm1500001575007959157500165459Overhead 10 % ..16546Jumlah ..182005811"1"0Memasang PVC Waterstop Lebar 200 mmDibulatkan2416000.0070OHMandor1000007000.0040OHKepala Tukang1030004120.0350OHTukang Batu9500033250.0700OHPekerja7500052501.0500M1Waterstop Lebar 200 mm2000002100009687210000219687Overhead 10 % ..21969Jumlah ..241656821"1"0Memasang PVC Waterstop Lebar 230 mm - 320 mmDibulatkan2773000.0040OHMandor1000004000.0040OHKepala Tukang1030004120.0400OHTukang Batu9500038000.0800OHPekerja7500060001.0500M1Waterstop Lebar 230 mm23000024150010612241500252112Overhead 10 % ..25211Jumlah ..277323831KgPembesian Dengan Besi Polos Atau Besi UlirDibulatkan120000.0004OHMandor100000400.0007OHKepala Tukang103000720.0070OHTukang Besi950006650.0070OHPekerja750005251.0500KgBesi Beton (Polos / Ulir)900094500.0150KgKawat Beton150002251302967510977Overhead 10 % ..1098Jumlah ..12075841KgKabel Presstressed Polos / StrandsDibulatkan127000.0003OHMandor100000300.0005OHKepala Tukang103000520.0050OHTukang Besi950004750.0050OHPekerja750003751.0500KgBesi Presstressed Polos10000105000.0100KgKawat Beton150001509321065011582Overhead 10 % ..1158Jumlah ..12740851KgJaring Kawat Baja / Wire MeshDibulatkan120000.0001OHMandor100000100.0025OHKepala Tukang1030002580.0025OHTukang Besi950002380.0025OHPekerja750001881.0200KgBesi Jaring Kawat Baja10000102000.0050KgKawat Beton15000756921027510968Overhead 10 % ..1097Jumlah ..12064861"1"0Pasang Bekisting untuk PondasiDibulatkan1463000.0260OHMandor10000026000.0260OHKepala Tukang10300026780.2600OHTukang Besi95000247000.5200OHPekerja75000390000.0400M3Kayu Klas II Papan 3000000120000600000.3000KgPaku 5 cm - 10 cm12000360036000.1000LtrMinyak Bekisting500050050068978124100Untuk kayu digunakan 2 X pakai64100133078Overhead 10 % ..13308Jumlah ..146386871"1"0Pasang Bekisting Untuk SloofDibulatkan1546000.0260OHMandor10000026000.0260OHKepala Tukang10300026780.2600OHTukang Besi95000247000.5200OHPekerja75000390000.0450M3Kayu Klas II Papan 3000000135000675000.3000KgPaku 5 cm - 10 cm12000360036000.1000LtrMinyak Bekisting500050050068978139100Untuk kayu digunakan 2 X pakai71600140578Overhead 10 % ..14058Jumlah ..154636881"1"0Pasang Bekisting Untuk KolomDibulatkan2339000.0330OHMandor10000033000.0330OHKepala Tukang10300033990.3300OHTukang Kayu95000313500.6600OHPekerja75000495000.0400M3Kayu Klas II Papan 3000000120000600000.4000KgPaku 5 cm - 10 cm12000480048000.2000LtrMinyak Bekisting5000100010000.0150M3Kayu Klas II Balok250000037500187500.3500LbrPlywood Tebal 9 mm11750041125205622.0000BtgKayu Dolken -8-10/4 m Galam20000400002000087549244425125112Untuk kayu digunakan 2 X pakai125112212662Overhead 10 % ..21266Jumlah ..233928891"1"0Pasang Bekisting Untuk BalokDibulatkan2380000.0330OHMandor10000033000.0330OHKepala Tukang10300033990.3300OHTukang Kayu95000313500.6600OHPekerja75000495000.0400M3Kayu Klas II Papan 3000000120000600000.4000KgPaku 5 cm - 10 cm12000480048000.2000LtrMinyak Bekisting5000100010000.0180M3Kayu Klas II Balok250000045000225000.3500LbrPlywood Tebal 9 mm11750041125205622.0000BtgKayu Dolken -8-10/4 m Galam20000400002000087549211925Untuk kayu digunakan 2 X pakai128862216412Overhead 10 % ..21641Jumlah ..238053901"1"0Pasang Bekisting Untuk LantaiDibulatkan4311000.0330OHMandor10000033000.0330OHKepala Tukang10300033990.3300OHTukang Kayu95000313500.6600OHPekerja75000495000.0400M3Kayu Klas III Papan 25000001000000.4000KgPaku 5 cm - 10 cm1200048000.2000LtrMinyak Bekisting500010000.0150M3Kayu Klas II Balok2500000375000.3500LbrPlywood Tebal 9 mm117500411256.0000BtgKayu Dolken -8-10/4 m Galam2000012000087549304425391974Overhead 10 % ..39197Jumlah ..431171911"1"0Pasang Bekisting Untuk DindingDibulatkan2375000.0330OHMandor10000033000.0330OHKepala Tukang10300033990.3300OHTukang Kayu95000313500.6600OHPekerja75000495000.0300M3Kayu Klas II Papan 300000090000450000.4000KgPaku 5 cm - 10 cm12000480048000.2000LtrMinyak Bekisting5000100010000.0200M3Kayu Klas II Balok250000050000250000.3500LbrPlywood Tebal 9 mm11750041125205623.0000BtgKayu Dolken -8-10/4 m Galam2000060000300004.0000BhFormtie / Penjaga Jarak Bekisting / Spacer5002000200087549248925Untuk kayu digunakan 2 X pakai128362215912Overhead 10 % ..21591Jumlah ..237503921"1"0Pasang Bekisting Untuk TanggaDibulatkan3153000.0330OHMandor10000033000.0330OHKepala Tukang10300033990.3300OHTukang Kayu95000313500.6600OHPekerja75000495000.0300M3Kayu Klas III Papan 2500000750000.4000KgPaku 5 cm - 10 cm1200048000.1500LtrMinyak Bekisting50007500.0150M3Kayu Klas II Balok2500000375000.3500LbrPlywood Tebal 9 mm117500411252.0000BtgKayu Dolken -8-10/4 m Galam200004000087549199175286724Overhead 10 % ..28672Jumlah ..315396931"1"0Pasangan Jembatan Pengecoran BetonDibulatkan1105000.0080OHMandor1000008000.0050OHKepala Tukang1030005150.0500OHTukang Kayu9500047500.1500OHPekerja75000112500.0264M3Kayu Klas III Papan 2500000660000.6000KgPaku 5 cm - 12 cm1200072000.5000BtgKayu Dolken -8-10/4 m Galam20000100001731583200100515Overhead 10 % ..10052Jumlah ..110566941"1"0Membuat Pondasi Beton Bertulang (150 Kg Besi + Bekisting)Dibulatkan36364000.2650OHMandor100000265000.2650OHKepala Tukang103000272951.0500OHTukang Besi95000997500.2750OHTukang Batu95000261251.3000OHTukang Kayu950001235005.3000OHPekerja750003975000.2000M3Kayu Klas III Papan 25000005000001.5000KgPaku 5 cm - 12 cm12000180000.4000LtrMinyak Bekisting50002000157.5000KgBesi Beton Polos900014175002.2500KgKawat Beton1500033750336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton15000012150070067026051503305820Overhead 10 % ..330582Jumlah ..3636402951"1"0Membuat Sloof Beton Bertulang (200 Kg Besi + Bekisting)Dibulatkan44690000.2830OHMandor100000283000.3230OHKepala Tukang103000332691.4000OHTukang Besi950001330000.2750OHTukang Batu95000261251.5600OHTukang Kayu950001482005.6400OHPekerja750004230000.2700M3Kayu Klas III Papan 25000006750002.0000KgPaku 5 cm - 12 cm12000240000.6000LtrMinyak Bekisting50003000210.0000KgBesi Beton Polos900018900003.0000KgKawat Beton1500045000336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton15000012150079189432709004062794Overhead 10 % ..406279Jumlah ..4469073961"1"0Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting)Dibulatkan74454000.3530OHMandor100000353000.4030OHKepala Tukang103000415092.1000OHTukang Besi950001995000.2750OHTukang Batu95000261251.6500OHTukang Kayu950001567507.0500OHPekerja750005287500.4000M3Kayu Klas III Papan 250000010000004.0000KgPaku 5 cm - 12 cm12000480002.0000LtrMinyak Bekisting500010000315.0000KgBesi Beton Polos900028350004.5000KgKawat Beton1500067500336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton1500001215000.1500M3Kayu Klas II Balok25000003750003.5000LbrPlywood Tebal 9 mm11750041125020.0000BtgKayu Dolken -8 cm / 4 m2000040000098793457806506768584Overhead 10 % ..676858Jumlah ..7445442971"1"0Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting)Dibulatkan57997000.3180OHMandor100000318000.3330OHKepala Tukang103000342991.4000OHTukang Besi950001330000.2750OHTukang Batu95000261251.6500OHTukang Kayu950001567506.3500OHPekerja750004762500.3200M3Kayu Klas III Papan 25000008000003.2000KgPaku 5 cm - 12 cm12000384001.6000LtrMinyak Bekisting50008000210.0000KgBesi Beton Polos900018900003.0000KgKawat Beton1500045000336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton1500001215000.1400M3Kayu Klas II Balok25000003500002.8000LbrPlywood Tebal 9 mm11750032900016.0000BtgKayu Dolken -8 cm / 4 m2000032000085822444143005272524Overhead 10 % ..527252Jumlah ..5799776981"1"0Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting)Dibulatkan53913000.2650OHMandor100000265000.2650OHKepala Tukang103000272951.0500OHTukang Besi95000997500.2750OHTukang Batu95000261251.3000OHTukang Kayu950001235005.3000OHPekerja750003975000.3200M3Kayu Klas III Papan 25000008000003.2000KgPaku 5 cm - 12 cm12000384001.6000LtrMinyak Bekisting50008000157.5000KgBesi Beton Polos900014175002.2500KgKawat Beton1500033750336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton1500001215000.1200M3Kayu Klas II Balok25000003000002.8000LbrPlywood Tebal 9 mm11750032900032.0000BtgKayu Dolken -8 cm / 4 m2000064000070067042005504901220Overhead 10 % ..490122Jumlah ..5391342991"1"0Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting)Dibulatkan51050000.2650OHMandor100000265000.2620OHKepala Tukang103000269861.0500OHTukang Besi95000997500.2750OHTukang Batu95000261251.3000OHTukang Kayu950001235005.3000OHPekerja750003975000.2400M3Kayu Klas III Papan 25000006000003.2000KgPaku 5 cm - 12 cm12000384001.6000LtrMinyak Bekisting50008000157.5000KgBesi Beton Polos900014175002.2500KgKawat Beton1500033750336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton1500001215000.1600M3Kayu Klas II Balok25000004000002.8000LbrPlywood Tebal 9 mm11750032900024.0000BtgKayu Dolken -8 cm / 4 m2000048000070036139405504640911Overhead 10 % ..464091Jumlah ..51050021001"1"0Membuat Tangga Beton Bertulang (200 Kg Besi + Bekisting)Dibulatkan53512000.2830OHMandor100000283000.3230OHKepala Tukang103000332691.4000OHTukang Besi950001330000.2750OHTukang Batu95000261251.5600OHTukang Kayu950001482005.6500OHPekerja750004237500.2500M3Kayu Klas III Papan 25000006250003.0000KgPaku 5 cm - 12 cm12000360001.2000LtrMinyak Bekisting50006000210.0000KgBesi Beton Polos900018900003.0000KgKawat Beton1500045000336.0000KgSemen Portland13004368000.5400M3Pasir Beton140000756000.8100M3Kerikil Beton1500001215000.1050M3Kayu Klas II Balok25000002625002.5000LbrPlywood Tebal 9 mm11750029375014.0000BtgKayu Dolken -8 cm / 4 m2000028000079264440721504864794Overhead 10 % ..486479Jumlah ..53512731011"1"0Membuat Kolom Penguat Beton Bertulang (11 x 11) cmDibulatkan736000.0090OHMandor1000009000.0060OHKepala Tukang1030006180.0200OHTukang Besi9500019000.0200OHTukang Batu9500019000.0200OHTukang Kayu9500019000.1800OHPekerja75000135000.0020M3Kayu Klas III Papan 250000050000.0100KgPaku 5 cm - 12 cm120001203.0000KgBesi Beton Polos9000270000.4500KgKawat Beton1500067504.0000KgSemen Portland130052000.0060M3Pasir Beton1400008400.0090M3Kerikil Beton1500001350207184626066978Overhead 10 % ..6698Jumlah ..736761021"1"0Membuat Ring Balok Beton Bertulang (10 x 15) cmDibulatkan943000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.0330OHTukang Besi9500031350.0330OHTukang Batu9500031350.0330OHTukang Kayu9500031350.2970OHPekerja75000222750.0030M3Kayu Klas III Papan 250000075000.0200KgPaku 5 cm - 12 cm120002403.6000KgBesi Beton Polos9000324000.0500KgKawat Beton150007505.5000KgSemen Portland130071500.0090M3Pasir Beton14000012600.0150M3Kerikil Beton1500002250342105155085760Overhead 10 % ..8576Jumlah ..94336EAnalisa Biaya Konstruksi Pekerjaan Dinding1031"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 PsDibulatkan2736000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200043.5000KgSemen Portland1300565500.0800M3Pasir Pasang1400001120069060179750248810Overhead 10 % ..24881Jumlah ..2736911041"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 PsDibulatkan2602000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200032.9500KgSemen Portland1300428350.0910M3Pasir Pasang1400001274069060167575236635Overhead 10 % ..23664Jumlah ..2602981051"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 4 PsDibulatkan2514000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200026.5500KgSemen Portland1300345150.0930M3Pasir Pasang1400001302069060159535228595Overhead 10 % ..22860Jumlah ..2514541061"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 5 PsDibulatkan2466000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200022.2000KgSemen Portland1300288600.1020M3Pasir Pasang1400001428069060155140224200Overhead 10 % ..22420Jumlah ..2466201071"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 6 PsDibulatkan2444000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200018.5000KgSemen Portland1300240500.1220M3Pasir Pasang1400001708069060153130222190Overhead 10 % ..22219Jumlah ..2444091081"1"0Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Kp : 10 PsDibulatkan2278000.0300OHMandor10000030000.0200OHKepala Tukang10300020600.2000OHTukang Batu95000190000.6000OHPekerja7500045000140.0000BhBatu Bata80011200010.0800KgSemen Portland1300131040.0925M3Pasir Pasang140000129500.0275KgKapur Pasang281869060138062207122Overhead 10 % ..20712Jumlah ..2278341091"1"0Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 PsDibulatkan1325000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.1000OHTukang Batu9500095000.3000OHPekerja750002250070.0000BhBatu Bata8005600018.9500KgSemen Portland1300246350.0380M3Pasir Pasang14000053203453085955120485Overhead 10 % ..12048Jumlah ..1325341101"1"0Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 PsDibulatkan1262000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.1000OHTukang Batu9500095000.3000OHPekerja750002250070.0000BhBatu Bata8005600014.3700KgSemen Portland1300186810.0400M3Pasir Pasang14000056003453080281114811Overhead 10 % ..11481Jumlah ..1262921111"1"0Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 4 PsDibulatkan1226000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.1000OHTukang Batu9500095000.3000OHPekerja750002250070.0000BhBatu Bata8005600011.5000KgSemen Portland1300149500.0430M3Pasir Pasang14000060203453076970111500Overhead 10 % ..11150Jumlah ..1226501121"1"0Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 5 PsDibulatkan1203000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.1000OHTukang Batu9500095000.3000OHPekerja750002250070.0000BhBatu Bata800560009.6800KgSemen Portland1300125840.0450M3Pasir Pasang14000063003453074884109414Overhead 10 % ..10941Jumlah ..1203551131"1"0Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 PsDibulatkan1190000.0150OHMandor10000015000.0100OHKepala Tukang10300010300.1000OHTukang Batu9500095000.3000OHPe