ANALISA SATUAN PEKERJAAN BERDASARKAN SNI 2013 NO MACAM PEKERJAAN UPAH BAHAN 1 2 3 4 PEKERJAAN PERSIAPAN 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN A.2.2.1.9 1.0000 MEMBERSIHKAN LAPANGAN DAN PERALATAN SNI 2013 0.1000 L.01 OH Pekerja @ RP - 0.0500 L.15 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.2.1.16 1 M3 PENGGALIAN TANAH BIASA SEDALAM 1 M SNI 2013 0.7500 L.01 OH Pekerja @ RP - 0.0250 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.4 1 M3 PENGGALIAN TANAH KERAS SEDALAM 1 M SNI 2013 1.0000 L.01 OH Pekerja @ RP - 0.0320 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER SNI 2013 0.3300 L.01 OH Pekerja @ RP - 0.0100 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.9 1 M3 PENGURUGAN KEMBALI GALIAN TANAH SNI 2013 Dihitung dari 1/3 kali koefisen pekerjaan galian 0.5000 L.01 OH Pekerja @ RP - 0.5000 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.10 1 M2 PEMADATAN TANAH PER 20 CM SNI 2013 0.5000 L.01 OH Pekerja @ RP - 0.0500 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.11 1 M2 PENGURUGAN DENGAN PASIR URUG SNI 2013 0.3000 L.01 OH Pekerja @ RP - 0.0100 L.04 OH Mandor @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.13 1 M2 LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN SNI 2013 0.1500 L.01 OH Pekerja @ RP - 0.0150 L.04 OH Mandor @ RP - 6.0000 Ijuk @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.2.3.1.14 SNI 2013 0.2500 L.01 OH Pekerja @ RP - 0.0250 L.04 OH Mandor @ RP - 1.2000 Sirtu @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - A.3.1.2 SNI 2013 1.5000 L.01 OH Pekerja @ RP - 0.7500 L.02 OH Tukang Batu @ RP - 0.0750 L.03 OH Kepala Tukang @ RP - 0.0750 L.04 OH Mandor @ RP - 1.2000 Batu Belah @ RP - 163.0000 Kg Semen portland @ RP - 0.5200 M.08 Pasir pasang @ RP - Jumlah (Belum PPN) - - Jasa 10% - - Jumlah - - Dibulatkan - - M 2 M 3 1 M 2 PENGURUGAN SIRTU PADAT M 3 1 M 3 PEMASANGAN PONDASI BATU BELAH CAMPURAN 1:4 PP M 3 M 3

Embed Size (px)

description

Hansat

Transcript of Analisa Harga Satuan Edit Sni

ANALISA kosong hargaANALISA SATUAN PEKERJAAN BERDASARKAN SNI 2013NOMACAM PEKERJAANUPAHBAHANALATJUMLAH123456PEKERJAAN PERSIAPAN1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANA.2.2.1.91.0000M2MEMBERSIHKAN LAPANGAN DAN PERALATANSNI [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.2.1.161 M3 PENGGALIAN TANAH BIASA SEDALAM 1 MSNI [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.41 M3 PENGGALIAN TANAH KERAS SEDALAM 1 MSNI [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.81 M3 PEMBUANGAN TANAH SEJAUH 30 METERSNI [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.91 M3 PENGURUGAN KEMBALI GALIAN TANAHSNI 2013Dihitung dari 1/3 kali koefisen pekerjaan [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.101 M2 PEMADATAN TANAH PER 20 CMSNI [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.111 M2 PENGURUGAN DENGAN PASIR URUGSNI [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.131 M2 LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPANSNI [email protected] [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.2.3.1.141 M2 PENGURUGAN SIRTU PADATSNI [email protected] [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.3.1.21 M3 PEMASANGAN PONDASI BATU BELAH CAMPURAN 1:4 PPSNI [email protected] RP0.00.00.7500L.02OHTukang [email protected] RP0.00.00.0750L.03OHKepala [email protected] [email protected] RP0.00.01.2000M3Batu [email protected] RP0.00.0163.0000KgSemen [email protected] RP0.00.00.5200M.08M3Pasir [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0A.3.2.1.91 M3 PASANGAN BATU KOSONGSNI 20131.0000M3Pasangan batu mortar (batu kali) 1 Pc : 5 [email protected] RP0.00.3900L.04OHTukang [email protected] RP0.00.0390L.03OHKepala Tukang [email protected] [email protected] RP0.01.2000M.11M3Batu [email protected] RP0.00.4320M.18M3Pasing [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0559,990.00A.4.1.1.11 M3 BETON UNTUK LANTAI KERJASNI 20131.0000M3Membuat Beton Campuran 1 PC : 2 PSR : 5 [email protected] RP0.00.2750L.02OHTukang [email protected] RP0.00.0280L.03OHKepala Tukang [email protected] [email protected] RP0.0247.0000M.18kgSemen [email protected] RP0.00.5753M.09M3Pasir [email protected] RP0.00.6890M3Kerikil [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0755,000.00A.4.1.1.41 M3 BETON UNTUK LANTAI KERJASNI 20131.0000M3Membuat Beton Campuran 1 PC : 2 PSR : 5 [email protected] RP0.00.2000L.02OHTukang [email protected] RP0.00.0200L.03OHKepala Tukang [email protected] [email protected] RP0.0230.0000M.18kgSemen [email protected] RP0.00.5799M.09M3Pasir [email protected] RP0.00.7083M3Kerikil [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0755,000.00A.4.1.1.51 M3 BETONSNI 20131.0000M3Membuat Beton Campuran 1 PC : 2 PSR : 5 [email protected] RP0.00.2750L.02OHTukang [email protected] RP0.00.0280L.03OHKepala Tukang [email protected] [email protected] RP0.0326.0000M.18kgSemen [email protected] RP0.00.4935M.09M3Pasir [email protected] RP0.00.7097M3Kerikil [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0755,000.00A.4.1.1.51 M3 BETONSNI 20131.0000M3Membuat Beton Campuran 1 PC : 2 PSR : 5 [email protected] RP0.00.2750L.02OHTukang [email protected] RP0.00.0280L.03OHKepala Tukang [email protected] [email protected] RP0.0326.0000M.18kgSemen [email protected] RP0.00.4935M.09M3Pasir [email protected] RP0.00.7097M3Kerikil [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0755,000.00A.4.1.1.1710 KG PEMBESIAN BESI POLOS ATAU BESI ULIRSNI 20131.0000M3Membuat Beton Campuran 1 PC : 2 PSR : 5 [email protected] RP0.00.0700L.02OHTukang [email protected] RP0.00.0007L.03OHKepala Tukang [email protected] [email protected] RP0.010.5000M.18kgBesi beton (polos/ulir)@ RP0.00.1500M.09kgKawat [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0755,000.00Pembesian besi polos 1 kg0.00.00.00.0755,000.00A.4.1.1.201 M2 MEMBUAT BEKISTING FONDASI (2X Pemakaian)SNI [email protected] RP0.00.1300L.02OHTukang [email protected] RP0.00.0130L.03OHKepala tukang [email protected] [email protected] RP0.00.0200M3Kayu kelas [email protected] RP0.0176,000.000.1500M.77kgPaku 5 cm -10 [email protected] RP0.00.0500M.95LMinyak [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.01379.4Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0152,550.00A.4.1.1.211 M2 MEMBUAT BEKISTING SLOOFSNI [email protected] RP0.00.2600L.02OHTukang [email protected] RP0.00.0260L.03OHKepala tukang [email protected] [email protected] RP0.00.0450M3Kayu kelas [email protected] RP0.0176,000.000.3000M.77kgPaku 5 cm -10 [email protected] RP0.00.1000M.95LMinyak [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.01379.4Jumlah0.00.00.00.0Dibulatkan0.00.00.00.00.0A.4.1.1.241 M2 PEMASANGAN 1 M2 BEKISTING UNTUK LANTAISNI [email protected] RP0.00.3300L.02OHTukang [email protected] RP0.00.0330L.03OHKepala tukang [email protected] [email protected] RP0.00.0400M3Kayu kelas [email protected] RP0.0176,000.000.4000M.77kgPaku 5 cm -12 [email protected] RP0.00.2000M.95LMinyak [email protected] RP0.00.0150M3Balok kayu kelas [email protected] RP0.00.3500LbrPlywood tebal 9 mm0.06.0000BatangDolken kayu galam 8-10 panjang 4 m0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.01379.4Jumlah0.00.00.00.0Dibulatkan0.00.00.00.00.0A.5.1.1 32.1 M1 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"SNI 2013M3Urugan Pasir1.2000M3PIPA [email protected] RP0.00.3500Hrg [email protected] [email protected] RP0.00.1350ohTukang [email protected] RP0.00.0135L.02ohKepala [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0DihitungDOKUMENTASI DAN AS BUILT DRAWING0.10001.0000lsCetak kalkir [email protected] RP0.00.01.0000lsCetak (potocopy)@ [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0L.041 BH PASANG PAPAN NAMA PROYEKSNI 20121.0000M.lbrMultiplek tebal 12 [email protected] RP0.00.00.2500M.77kgPaku biasa [email protected] RP0.00.01.0000M.kgCat [email protected] RP0.00.00.5000L.01ohTukang [email protected] RP0.00.00.0500l.05ohKepala Tukang [email protected] [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0400,000.00T.07.c1 M3 MENGANGKUT HASIL GALIAN KETEMPAT PEMBUANGAN DENGAN JARAK ANGKUT LEBIH BESARSNI 20123M SAMPAI LEBIH KECIL ATAU SAMA DENGAN 10 M TERMASUK PERATAAN DAN [email protected] [email protected] RP0.00.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0Dihitung1 M2 PASANGAN PAVING BLOCK BETON 6 CM1.0000M2Pasangan Pavingblock Beton Warna Khusus 6 cm1.0000M2Paving block Warna Khusus 6 [email protected] RP0.00.00.100M3Pasir Beton DipadatkanTebal 5 [email protected] RP0.00.00.018M3Abu [email protected] RP0.01.0000LSAlat [email protected] [email protected] RP0.00.0900L.04OHTukang [email protected] RP0.00.0090L.03OHKepala tukang [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0198,250.00Dihitung1 M2 PASANGAN PAVING BLOCK BETON 8 CM1.0000M2Pasangan Pavingblock Beton Warna Khusus 8 cm1.0000M2Paving block Warna Khusus 8 [email protected] RP0.00.00.110M3Pasir Beton DipadatkanTebal 5 [email protected] RP0.00.00.018M3Abu [email protected] RP0.01.0000LSAlat [email protected] [email protected] RP0.00.0900L.04OHTukang [email protected] RP0.00.0090L.03OHKepala tukang [email protected] [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.00.01 M2 PASANGAN PLASTIK BETONSNI 20121.0000M2PASANGAN PLASTIK [email protected] [email protected] RP0.00.0010L.04OHTukang [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.00.01 M3 LAPISAN BATU KERIKILSNI 20121.0000M2PASANGAN PLASTIK BETON1.1000M2Batu [email protected] [email protected] RP0.00.0200L.04OHTukang [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0127,600.001 M3 LAPISAN BATU BELAH DAN KERIKILSNI 20121.1000M2Batu belah dan [email protected] [email protected] RP0.00.1500L.04OHTukang [email protected] RP0.0Jumlah (Belum PPN)0.00.00.00.0Jasa 10%0.00.00.00.0Jumlah0.00.00.00.0Dibulatkan0.00.00.00.0180,250.00P.111 M1 BUIS BETON DIANGKUT