DATA PEKERJAAN GALIAN KM. 49+012 - 49+069,7PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
49+012
CL
49+029
49+038,7
49+043,2
49+069,7
2,00 4,00
1,50
3,00
2,70
2,00 3,30
4,00
1,50
3,00
2,00 4,00 2,00
1,202,30
0 (0/0) 1 (4,00/0)
3 (7,30/2,00)
5 (2,50/2,40)
2 (5,00/2,00)
4 (7,90/3,20)
2,40 Galian
Existing
0(0/0)
CELAH
2(5,30/4,00)
3(6,80/4,00)
4(8,30/7,00)
5(3,50/5,90)
0 (0/0) 1(4,00/0)
2(5.50/3,00)3(8,20/3,00)
4(8,95/4,50)5(2,50/3,50)
5,90
3,50
2,00 4,30 1,502,00
1,00
0 (0/0) 1(4,30/0)
2(5,05/1,50) 3(7,05/1,50)
4(8,05/2,50)5(2,00/2,00)2,00
2,00 3,503,00
2,002,00
0 (0/0) 1(3,50/0)
2(5,00/3,00)3(7,00/3,00)
4(8,00/5,00)5(3,00/4,00)
2,00
Galian
Existing
1 (3,30/0)
-
STA/KM
-
KM. 49+012 - 49+069,7PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+084,7 - 49+137,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
49+084,7
CL
49+096,1
49+114,1
49+137,1
2,00 4,403,00
3,00
1,50
0 (0/0) 1 (4,40/0)
3 (7,40/3,00)
5 (4,00/5,00)
2 (5,90/3,00)
4 (8,90/6,00)
5,00 Galian
Existing
0(0/0)
5,40
Galian
Existing
2,50
2,00
3,00
1,50
1 (5,40/0)
3 (8,65/2,50)
5 (2,70/3,00)
2 (6,65/2,50)
4 (9,40/4,00)
2,00
0(0/0)4,00
Galian
Existing 1,503,30
1,50
1 (5,40/0)
3 (8,65/2,50)
5 (2,80/3,30)
2 (6,65/2,50)
4 (9,40/4,00)
2,00 2,20
4,00
Galian
Existing
1 (4,00/0)
2,00
0(0/0)
2,00
2,00
1,50
2,00
1,50 2,00
2 (5,00/2,00)3 (6,50/2,00)
4 (7,50/4,00)5 (9,50/4,00)
6 (10,50/6,00)
8 (12,75/7,50)
10 (14,35/8,50)
11 (4,50/7,20)
-
STA/KM
-
KM. 49+084,7 - 49+137,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
1,10 1,00
1,50
5 (9,50/4,00)
6 (10,50/6,00) 7 (12,00/6,00)
8 (12,75/7,50) 9 (13,85/7,50)
10 (14,35/8,50)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+160,1 - 49+237,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
49+160,1
CL
49+183,1
49+216,1
49+237,1
4,40
CELAH / BLANG
3,50
Galian
Existing
1 (4,00/0)
2,00
0(0/0)
2,50
1,00
1,80
1,20
1,50
1,50 2,00
1,50
2 (5,00/2,00)3 (6,50/2,00)
4 (7,50/4,00)5 (9,50/4,00)
6 (10,50/6,00)
8 (12,75/7,50)
10 (14,35/8,50)11 (5,50/8,70)
4,00 2,00
2,002,50
2,00 2,00
1,50
Existing
1 (4,00/0)0(0/0)
2 (5,00/2,00)3 (7,00/2,00)
4 (8,25/4,50)5 (10,25/4,50)
6 (11,25/6,50)7 (12,75/6,50)
8 (13,25/7,50)
10 (14,75/8,50)
11 (4,50/7,40)
Galian
4,00
Existing
1 (4,00/0)
Galian
2,00
2,004,00
1,502,00
1,003,00
7 (4,70/8,00)
2 (6,00/4,00)3 (7,50/4,00)
4 (8,50/6,00)5 (9,50/6,00)
6 (11,00/9,00)
4,50
Existing2,00 1,50
1 (4,50/0)
2 (5,25/1,50)
3 (0,90/1,20)
-
STA/KM
-
KM. 49+160,1 - 49+237,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
1,002,00
1,506 (10,50/6,00) 7 (12,00/6,00)
9 (13,85/7,50)
10 (14,35/8,50)
2,00
1,50 1,00
1,001,00
5 (10,25/4,50)
7 (12,75/6,50)
8 (13,25/7,50) 9 (14,25/7,50)
10 (14,75/8,50)
5 (9,50/6,00)
6 (11,00/9,00)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+244,1 - 49+290,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
49+244,1
49+253,1
49+290,1
3,00
3,00
GalianExisting
1 (3,00/0)
2,00
0(0/0)
7 (3,00/6,30)
4,00 2,50
2,50
2,00
1,50
Existing
1 (4,00/0)0(0/0)
2 (5,25/2,50)3 (6,75/2,50)
4 (8,00/5,00)5 (10,00/5,00)
6 (11,25/7,50)
8 (15,25/11,50)
11 (5,90/11,90)
Galian
4,50
ExistingGalian
2,00
2,002,20
2,50
2,501,50
1,502,00
3 (5,75/2,50)
5 (8,50/5,00)
6 (9,50/7,00)
4 (7,00/5,00)
2 (4,25/2,50)
2,50
2,00
2,00 1,50
1,00 1,50
2,00
1 (4,50/0)0(0/0)
2 (5,60/2,20)
4 (8,35/3,70)
6 (10,10/5,20)
8 (12,85/6,70)
11 (4,50/7,90)
3 (7,60/2,20)
5 (9,35/3,70)
7 (12,10/5,20)7,90
-
STA/KM
-
KM. 49+244,1 - 49+290,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
4,00
2,00
5 (10,00/5,00)
6 (11,25/7,50)7 (13,25/7,50)
8 (15,25/11,50)9 (17,25/11,50)
10 (18,25/13,50)
2,005 (8,50/5,00)
6 (9,50/7,00)
2,00
1,50
2,00 2,008 (12,85/6,70)
5 (9,35/3,70)
7 (12,10/5,20)
9 (14,85/6,70)
10 (15,85/8,70)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+314,1 - 49+398,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
49+314,1CL
49+335,1
49+376,1
49+383,1
49+398,1
7,00
CELAH
3,00GalianExisting
1 (7,00/0)
2,00
0(0/0)
3 (1,50/2,50)
8,00 2,50
Existing
1 (8,00/0)0(0/0)
2 (9,25/2,50)3 (10,25/2,50)
9 (5,50/6,80)
Galian
ExistingGalian
2,00
2,00
2 (8,50/7,00)
1 (4,00/0)0(0/0)
11 (4,50/6,40)
1,00 1,50
1,504 (11,00/4,00)
6 (13,50/6,00)
6,80
4,00 1,00
1,50 1,50
1,502,50
2,00
Existing2,00
3 (0,50/0,90)
6,40
3 (6,00/1,00)2 (4,50/1,00)
4 (6,75/2,50)5 (9,25/2,50)
6 (10,00/4,00)7 (12,00/4,00)
8 (13,00/6,00)
10 (15,00/7,00)
Existing
2,00
0(0/0)1,20
5,501 (5,50/0)
2 (6,10/1,20)
0,90
3 (0,50/2,00)
0(0/0)
3,006,00
1 (6,00/0)
2 (6,15/3,00)
0,90
-
STA/KM
-
KM. 49+314,1 - 49+398,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
2 (9,25/2,50)3 (10,25/2,50)
1,50 2,00
2,00 1,50
5 (12,50/4,00)
6 (13,50/6,00) 7 (15,50/6,00)
8 (16,25/7,50)
1,50
2,00
1,00
7 (12,00/4,00)
8 (13,00/6,00)9 (14,50/6,00)
10 (15,00/7,00)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+432,1 - 49+523,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
49+432,1
49+448,1
49+507,1
49+523,1
3,50
Galian
Existing
1 (3,50/0)
2,00
0(0/0)
11 (6,50/9,90)
Existing
Galian
2,00
0(0/0)
6,00
2,90
Existing
2,00
0(0/0) 1 (6,50/0)
2,00
1,50 2,00
1,50 2,00
1,50
2 (4,50/2,00)3 (6,00/2,00)
4 (7,00/4,00)5 (8,50/4,00)
6 (9,50/6,00)7 (11,00/6,00)
9,90
7,502,00
1,50
1,50
1,50Galian
Existing
1 (7,50/0)
2,00
0(0/0)
7 (5,50/5,80)
2 (8,50/2,00) 3 (9,50/2,00)5,80
4 (10,25/3,50)
6 (13,00/6,00)
2,00
2,002,00
1 (7,50/0)
5 (2,50/2,90)
2 (8,50/2,00)3 (10,50/2,00)
4 (11,50/4,00)
6,50 2,10
1,80 1,50
1,50
3 (9,35/2,10)2 (7,55/2,10)
4 (10,10/3,60) 5 (11,60/3,60)
6 (12,10/4,60)
8 (14,60/6,60)
9 (3,50/4,90)
4,90
-
STA/KM
-
KM. 49+432,1 - 49+523,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
2,00
2,00
3,00
6 (9,50/6,00)7 (11,00/6,00)
8 (12,00/8,00)9 (14,00/8,00)
10 (15,50/11,00)
1,50
1,50
2,50
3 (9,50/2,00)
5 (11,75/3,50)
6 (13,00/6,00)
3 (10,50/2,00)
1,001,50 2,00
5 (11,60/3,60)
7 (13,60/4,60)
8 (14,60/6,60)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 49+571,1 - 49+620,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
49+571,1
49+577,1
49+620,1
CELAH / BLANG
8,50
Galian
Existing
1 (8,50/0)
2,00
0(0/0)
7 (5,50/7,00)
Existing
Galian
2,00
0(0/0)
4,00
5,00
2,002 (9,50/2,00)
7,504,00
Galian
Existing
1 (7,50/0)
2,00
0(0/0)
5 (5,00/5,80)
2,50
2,003,50
1 (4,00/0)
5 (3,50/5,00)
2 (5,25/2,50)3 (7,25/2,50)
4 (9,00/6,00)
1,50 1,503 (11,00/2,00)
4 (11,75/3,50)7,00
1,50
2 (9,50/4,00)3 (11,00/4,00)
4 (12,50/7,00)
5,80
-
STA/KM
-
KM. 49+571,1 - 49+620,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
2 (9,50/2,00)
1,50
1,50
4,70
3 (11,00/2,00)
5 (13,25/3,50)
6 (15,60/8,20)
3,00
2 (9,50/4,00)3 (11,00/4,00)
4 (12,50/7,00)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 50+620 - 50+701PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL50+620
50+641
50+701
5,50Galian
Existing
1 (5,50/0)
2,00
0(0/0)
2,602 (6,80/2,60)
3 (3,00/1,90)1,90
4,50Galian
Existing
1 (4,50/0)
2,00
0(0/0)
4,50
2 (6,75/4,50)3 (2,50/3,60)
3,60
3,00
Galian
Existing
1 (3,00/0)
2,00
0(0/0)
4,20
2 (5,10/4,20)3 (2,00/3,80)
3,80
-
STA/KM
-
KM. 50+620 - 50+701PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 51+885 - 51+941PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
51+885 CL
51+900
51+934
51+941
3,00Galian
1 (1,50/1,50)
2,00
0(0/0)
2,00
2 (4,00/2,00)
3 (3,00/0)
4,50
Galian
Existing
1 (4,50/6,90)
0(0/0)
2 (9,50/8,00)
5 (4,50/0)
1,50
2,00
5,00
3,001,003 (8,00/5,00)
4 (7,00/5,00)6,90
6,50 2,001,50
3,00
3,50
2,50
1,00
Galian
Existing
1 (6,00/6,50)
0(0/0)
2 (14,25/7,50)
3 (13,00/5,00)4 (10,00/5,00)
5 (8,25/1,50) 6 (7,25/1,50)
7 (6,50/0)
6,50
6,002,00
1,502,00
1,501,20
2,50
2,00
1,50
Galian
Existing
1 (5,00/5,90)
0(0/0)
8 (7,00/2,00)
2 (14,35/7,70)
3 (13,10/5,20) 4 (11,60/5,20)
5 (11,00/4,00) 6 (9,50/4,00)
7 (8,50/2,00)
9 (6,00/0)
5,90
-
STA/KM
-
KM. 51+885 - 51+941PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 51+953 - 52+029PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
51+953
51+980
51+997
52+029
CELAH / BLANG
6,00
Galian
1 (5,50/5,90)
2,00
0(0/0)
2,00
2 (14,75/7,50)
1,50
1 (0,80/1,00)
2,00
2,00
1,501,50
2,00
Existing3 (13,75/5,50) 4 (12,25/5,50)
5 (11,50/4,00)6 (9,50/4,00)
7 (8,50/2,00) 8 (7,00/2,00)
9 (6,00/2,00)
6,00 2,001,00
1,502,00
1,502,50
1,401,50
Galian
1 (5,50/5,90)
0(0/0)
Existing3 (13,15/5,50) 4 (11,75/5,50)
5 (10,50/3,00)6 (9,00/3,00)
7 (8,00/1,00) 8 (6,50/1,00)
9 (6,00/0)
2 (13,90/7,00)
5,90
5,00 2,002,50
2,002,50
Galian
1 (3,50/3,90)
0(0/0)
Existing
2 (10,50/5,00)
3 (9,25/2,50)4 (7,25/2,50)
5 (6,00/0)
3,000(0/0)
5,90
3,90
1,002 (3,75/1,50)
3 (3,00/0)1,50
-
STA/KM
-
KM. 51+953 - 52+029PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 52+400 - 52+592PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
52+400
52+427G. Batu
52+454
52+491
52+521G. Batu
52+525,5
52+592
Galian
1 (2,50/2,90)
0(0/0)
2,00
1 (0,80/1,00)
Existing
0,800(0/0)
2,00
0(0/0)
3,500(0/0)
1,00
2 (4,25/1,50)
3 (3,50/0)
2 (5,50/4,00)
3 (3,50/0)3,50
4,00 2,90
Galian
1 (9,50/6,90)
0(0/0)
2,00
Existing
2 (7,50/8,00)
3 (3,50/0)
9,00
8,006,90
1 (1,00/0,80)2 (3,50/1,00)
3 (3,00/0)1,00 3,00
1 (0,90/1,90)
1,902 (4,75/2,50)
3 (3,50/0)
3,502,50
1,50
1 (0,80/1,00)
3,500(0/0)
1,00
2 (4,25/1,50)
3 (3,50/0)
1,50
1 (1,50/1,60)
0(0/0)
2 (5,25/2,50)
3 (4,00/0)4,00
2,50 1,60
-
STA/KM
-
KM. 52+400 - 52+592PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 52+607 - 52+732PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL52+607
52+644
52+663
52+691
52+703
52+732
BLANG
Galian
1 (2,50/1,90)
0(0/0)2,00
Existing2 (5,25/2,50)
3 (4,00/0)4,002,50
1,90
4,002,50
3,002,00
2,00G. Batu Lepas
1 (3,50/4,50)
0(0/0)
ExistingG. Biasa2 (8,75/5,50)
3 (7,25/2,50)4 (5,25/2,50)
5 (4,00/0)
4,50
4,00 2,00
1 (2,50/2,90)
0(0/0)
ExistingGalian3,30
2 (5,65/3,30)
3 (4,00/0)
2,90
3,001,00 2,00
0(0/0)3 (3,00/0)
2 (3,50/1,00) 1 (0,90/0,80)
4,00 2,003,50
0(0/0)3 (4,00/0)
2 (5,75/3,50)1 (2,00/2,50)
2,50
Existing
Galian
4,00
6,00
2,30
3,50
2,00
0(0/0)
2 (11,05/9,50)1 (5,30/7,90)
Existing
G. Batu Lepas
G. Biasa
3 (9,30/6,00)4 (7,00/6,00)
5 (4,00/0)
BLANG
7,90
-
STA/KM
-
KM. 52+607 - 52+732PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 52+833 - 52+951PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL52+833
52+851
52+895G. Batu
52+905G. Batu
52+951G. Batu
Galian
1 (1,50/2,20)
0(0/0)
2,00
Existing
2 (4,00/3,00)
3 (2,50/0)
2,503,00
2,20
2,003,00
1 (4,80/9,80)
0(0/0)
2 (8,50/11,00)
3 (3,00/0)
11,00 Galian9,80
2,002,503,50
1 (2,40/2,80)
0(0/0)3 (2,50/0)
2 (4,90/3,50)2,80
2,005,002,50
Existing
0(0/0)3 (5,00/0)
2 (6,25/2,50)1 (2,50/1,90)
1,90
BLANG
2,004,00
6,00
Existing
0(0/0)3 (4,00/0)
2 (6,00/6,00) 1 (4,10/4,60)
4,60
-
STA/KM
-
KM. 52+833 - 52+951PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 53+001 - 53+270PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
53+001
53+051
53+111
53+200
53+250
53+270
Galian
1 (4,00/6,90)
0(0/0)
2,00
Existing
2 (8,00/8,00)
3 (3,50/0)
6,90
4,00
8,00
3,503,00
0(0/0)
3 (4,00/0)
2 (5,00/3,00) 1 (1,50/1,90)
1,90Galian
Existing
2,502,00
3 (2,50/0) 0(0/0)
2 (3,50/2,00) 1 (1,50/1,50)1,50
BLANG
3,002,00
3 (3,00/0) 0(0/0)
2 (4,00/2,00) 1 (1,80/1,50)1,50
G. Batu Lepas
2,00 4,003 (4,00/0) 0(0/0)
2 (5,00/2,00)1 (1,50/1,40)
1,40
2,00 3,50
3 (3,50/0) 0(0/0)
2 (4,50/2,00)1 (1,20/1,40)
1,40
-
STA/KM
-
KM. 53+001 - 53+270PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 53+315 - 53+515PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
53+315
53+365
53+415
53+465
53+515
Galian
1 (2,00/1,90)
0(0/0)
Existing
2 (3,75/2,50)
3 (2,50/0)
2,502,50 1,90
3,003,00
0(0/0)3 (3,00/0)
2 (4,50/3,00)1 (1,90/2,20)
2,20
2,502,000(0/0)3 (2,50/0)
2 (3,50/2,00)1 (1,50/1,50)
1,50
3,00
0(0/0)3 (3,00/0)
2 (7,50/9,00)
1 (1,90/4,90)
9,00
4,90
2,00
2,50
6,00Galian
Existing
0(0/0)3 (2,50/0)
2 (5,50/6,00)1 (3,40/5,20)
5,20
-
STA/KM
-
KM. 53+315 - 53+515PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 53+565 - 53+750PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
53+565
53+615
53+679
53+696
53+719
53+750
Galian
1 (1,00/1,50)
0(0/0)2,00
Existing
2 (2,50/2,00)
3 (1,50/0)1,502,00
1,50
0(0/0)3 (1,50/0)2,50
3,00
2 (3,00/3,00) 1 (2,50/2,20)
2,002,20
3,003,50
0(0/0)3 (3,50/0)
2 (5,00/3,00)1 (2,20/2,10)
2,00
2,10
BLANG
1,501,50
2,50
0(0/0)5 (1,50/0)
2 (5,50/3,00)1 (2,20/2,20)
2,202,00
3 (4,75/1,50)4 (2,25/1,50)
1,50
8,00 2,00
2,50
4,00
4,00
0(0/0)5 (8,00/0)
2 (14,50/8,00)
1 (9,50/6,90)
3 (12,50/4,00)4 (10,00/4,00)
6,90
G. Batu
G. Biasa
10,00 2,00
5,00
2,00
4,00
G. Batu
G. Biasa
2 (16,50/9,00)
1 (10,00/7,10)
3 (14,50/5,00) 4 (12,50/5,00)
7,10
1' (5,40/3,90)
2' (10,00/4,00)
3' (8,00/0)
1' (6,90/4,90)
2' (12,50/5,00)
3' (10,00/0)
-
STA/KM0(0/0)5 (10,00/0)
-
KM. 53+565 - 53+750PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 53+765 - 54+015PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
53+765
53+791G. Batu
53+860
53+932G. Batu
53+975G. Batu
54+015
1 (10,00/5,10)
0(0/0)
2,00
2 (15,00/6,00)
5 (10,00/0)
5,10
10,00 2,00
2,50
3,50
3 (13,75/3,50)4 (11,75/3,50)
G. Batu
G. Biasa
0(0/0)3 (10,00/0)
10,00 2,00G. Batu
Existing1 (9,00/3,80)2 (12,25/4,50)
4,503,80
5,00
2,500(0/0)3 (2,50/0)
1 (3,00/4,20)2 (5,00/5,00)
4,20Galian
Existing
2,00
BLANG
4,50 2,00
4,00
0(0/0)3 (4,50/0)
1 (4,00/3,20)2 (6,50/4,00)
3,20
2,50 2,002,50
0(0/0)3 (2,50/0)
1 (1,80/1,90)2 (3,75/2,50)1,90
2,50 2,002,001,50
0(0/0)3 (2,50/0)
1 (1,80/1,50)2 (3,50/2,00)
1' (6,50/3,20)2' (11,75/3,50)
3' (10,00/0)
-
STA/KM
-
KM. 53+765 - 54+015PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 54+065 - 54+263PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
54+065
54+115
54+125
54+146
54+171
54+263G. Batu
Galian
1 (2,50/2,90)
0(0/0)
2,00
Existing2 (4,25/3,50)
3 (2,50/0)2,50
3,50 2,90
2,002,50
5,00
0(0/0)
2 (5,00/5,00)
3 (2,50/0)
Galian
1 (3,00/4,10)
Existing4,10
2,502,00
1,50
4,00
0(0/0)5 (2,50/0)
GalianExisting
2,00
2 (7,00/6,00) 1 (4,00/4,90)
3 (5,00/2,00)4 (3,50/2,00)
4,90
3,50 2,004,00
1,50
0(0/0)5 (3,50/0)
2 (8,00/6,00)
3 (7,00/4,00)4 (5,50/4,00)
2,00
Galian
Existing
1 (4,50/5,10)
5,10
3,50 1,002,00
0(0/0)3 (3,50/0)
2 (4,50/2,00) 1 (0,80/1,00)Existing
BLANG
2,00 2,003,00
2 (3,50/3,00) 1 (0,90/2,10)
-
STA/KM0(0/0)3 (2,00/0)
-
KM. 54+065 - 54+263PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 54+318 - 54+495PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
54+318
54+336
54+357G. Batu
54+403
54+489
54+495
1 (3,30/5,20)
0(0/0)2,00
Existing
2 (5,00/6,00)
3 (2,00/0)2,00
6,00 5,20
2,002,000(0/0)
2 (3,00/2,00)
3 (2,00/0)
1 (1,80/1,80)
BLANG
Galian
2,001,80
0(0/0)2,009,50
6,00
2 (12,50/6,00)
3 (9,50/0)
1 (8,00/5,10)
5,10
2,000(0/0)3 (2,00/0)
2 (3,50/3,00) 1 (1,60/2,10)
2,003,00 2,10
4,503,00
3 (4,50/0) 0(0/0)
2 (6,00/3,00) 1 (3,10/2,60)
2,602,00
4,502,00
3 (4,50/0) 0(0/0)
2 (5,50/2,00)1 (2,50/1,70)
1,702,00
-
STA/KM
-
KM. 54+318 - 54+495PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 54+515 - 54+553PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
54+515 CL
54+553
1 (4,00/4,50)
0(0/0)
2,00
Existing
2 (8,00/5,00)
5 (4,00/0)4,00
3,00
4,50
2,003,000(0/0)
2 (4,25/2,50)
3 (3,00/0)
1 (2,00/1,90)
BLANG
Galian2,501,90
G. Batu
G. Biasa2,001,503 (7,00/3,00)
4 (5,50/3,00)
BLANG
1' (2,70/2,90)2' (5,50/3,00)
3' (4,00/0)
-
STA/KM
-
KM. 54+515 - 54+553PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 54+650 - 54+985PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL54+650G. Batu
54+675
54+950
54+963
54+985
2,00
Galian
Existing
1 (2,00/0)0(0/0)
2,50
3 (1,50/2,10)2 (3,25/2,50)
5,00
1 (5,00/0)
2,00
0(0/0)
1,50
2 (6,75/3,50)BLANG
2,102,00
3,001 (3,00/0)0(0/0)
3 (1,80/2,10) 2 (4,50/3,00)2,10
2,003,00
3,503,50
1 (3,50/0)0(0/0)
3 (2,00/2,80) 2 (5,25/3,50)
2,00
2,80
2,00
3,50
2,00
5,003,00
2,002,50
1,50
Galian
Existing
3 (8,75/3,50)
4 (9,50/5,00)
6 (13,50/9,00)
7 (4,80/7,90)
1 (5,00/0)0(0/0)
2 (6,50/3,00)
2,00
3 (8,50/3,00)
4 (9,75/5,50)5 (11,25/5,50)
6 (12,25/7,50)
8 (15,50/10,00)
Galian
Existing
7,90
9 (5,10/8,80)
-
STA/KM
-
KM. 54+650 - 54+985PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
4,00
2,00
2,002,50
3 (8,75/3,50)
5 (11,50/5,00)
6 (13,50/9,00)
4 (9,75/5,50)5 (11,25/5,50)
7 (14,25/7,50)
8 (15,50/10,00)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 55+008 - 55+062PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
55+008
55+062
6,00
1 (6,00/0)
2,00
0(0/0)
1,50
2 (7,75/3,50)
2,00
3,50
2,00
Galian
Existing
3 (9,75/3,50)
4 (10,50/5,00)
6 (13,75/7,5)
7 (3,90/6,00)
6,00
5,00
1 (5,00/0)
2,00
0(0/0)
1,50
2 (6,75/3,50)
2,00
3,50
2,00
GalianExisting
3 (8,75/3,50)
4 (9,50/5,00)
6 (12,75/7,50)
7 (3,50/5,90)
7,90
-
STA/KM
-
KM. 55+008 - 55+062PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
2,002,50
3 (9,75/3,50)
5 (12,50/5,00)
6 (13,75/7,5)
2,50
3 (8,75/3,50)
5 (11,50/5,00)
6 (12,75/7,50)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 55+062 - 55+081PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
55+062
55+081
8,00
1 (8,00/0)
2,000(0/0)
1,502 (9,40/2,80)
2,80
2,90
1,60Galian
Existing
3 (10,90/2,80)
4 (12,35/5,70)5 (13,95/5,70)
6 (15,50/8,80)
9,20
2,00
Galian
Existing
3,10
9 (7,50/9,20)8 (17,95/10,70)
7,003,60
2,003,10
1,70
3,60
1 (7,00/0)0(0/0)
2 (8,80/3,60)3 (10,80/3,60)
4 (12,35/6,70)5 (14,05/6,70)
6 (15,85/10,30)
8 (18,50/12,00)
11 (10,10/13,70)
13,70
-
STA/KM
-
KM. 55+062 - 55+081PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
5 (13,95/5,70)
6 (15,50/8,80)7 (17,00/8,80)
3,10
1,50 1,90
8 (17,95/10,70)
3,60
1,80 1,70
1,003,50
5 (14,05/6,70)
7 (17,65/10,30)
8 (18,50/12,00) 9 (19,50/12,00)
10 (21,25/15,50)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 55+094 - 55+115PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
55+094
55+115
6,50
1 (6,50/0)
2,00
0(0/0)
1,50
2 (9,25/5,50)
5,50
2,60
Galian
Existing
3 (10,75/5,50)
4 (12,05/8,10)5 (13,55/8,10)
6 (15,10/11,20)7 (16,60/11,20)
17,90
2,00
Galian
Existing
3,10
1,50
11 (10,70/17,90)
7,00
1 (7,00/0)0(0/0)
15,70
1,50
5,00
8 (19,10/16,20)
3,60
2,402,20
1,602,60
2,50
3,40
1,40
2 (8,80/3,60)3 (11,20/3,60)
4 (12,30/5,80) 5 (13,90/5,80)
6 (15,20/8,40) 7 (17,70/8,40)
8 (19,40/11,80) 9 (20,80/11,80)
10 (22,30/14,80)
13 (10,20/15,70)
-
STA/KM
-
KM. 55+094 - 55+115PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
7 (16,60/11,20)
5,00
2,00
4,00
9 (21,10/16,20)
10 (23,10/20,20)
1,403,00
1,403,50
7 (17,70/8,40)
9 (20,80/11,80)
10 (22,30/14,80)11 (23,70/14,80)
12 (25,45/18,30)
-
ELEVASI
-
DATA PEKERJAAN GALIAN KM. 55+167 - 55+206,5PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
55+167
55+206,5
5,00
1 (5,00/0)
2,00
0(0/0)
Galian
Existing
4,80
1,103,00
2,00
2 (7,40/4,80)3 (8,50/4,80)
4 (10,00/7,80)
6 (13,90/11,60)7 (6,40/10,50)
10,50
5,00
1 (5,00/0)
2,00
0(0/0)
Galian
Existing
4,80
1,103,00
2,00
2 (7,40/4,80)3 (8,50/4,80)
4 (10,00/7,80)
6 (13,90/11,60)7 (6,40/10,50)
10,50
-
STA/KM
-
KM. 55+167 - 55+206,5PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
3,80
3 (8,50/4,80)
4 (10,00/7,80)5 (12,00/7,80)
6 (13,90/11,60)
3,80
3 (8,50/4,80)
4 (10,00/7,80)5 (12,00/7,80)
6 (13,90/11,60)
-
ELEVASI
-
DATA PEKERJAAN GALIANPAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
STA/KM
CL
5 Galian
1 (2,50/2,90)
0(0/0)
2,00
Existing2 (5,50/4,00)
3 (3,50/0)3,50
4,00 2,90
-
STA/KM
52+521G. Batu
-
KM. 54+318 - 54+PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I
ELEVASI
CELAH / BLANG
-
ELEVASI
-
49012-49069,749084-49137,149160,1-49237,149244,1-49290,149314,1 - 49398,149432,1 - 49523,149571,1 - 49620,150620 - 5070151885 - 5194151953 - 5202952400 - 5259252607 - 5273252833 - 5295153001 - 5327053315 - 5351553565 - 5375053765 - 5401554065 - 5426354318 - 5449554515 - 5455354650 - 5498555008 - 5506255062 - 5508155094 - 5511555167 - 55206,55