NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material A Kabel, Penyambungan dan Pekerjaan Sipil 1.1345 1.1002
0
1 DC-OF-SM-12D meter 8,677 3,003 8,414
2 DC-OF-SM-24D Idem 24 core meter 11,107 3,003 10,771
3 DC-OF-SM-48D Idem 48 core meter 15,949 3,003 15,467
4 DC-OF-SM-96D Idem 96 core meter 26,956 3,003 26,141
5 DC-OF-SM-144D Idem 144 core meter 38,573 3,653 37,407
6 DC-OF-SM-264D Idem 264 core meter 66,505 3,653 64,494
7 DC-OF-SM-288D Idem 288 core meter 71,216 3,647 69,063
8 DC-OF-SM-432D Idem 432 core meter 187,189 4,054 181,530
9 DC-OF-SM-960D Idem 960 core meter 336,947 4,054 326,759
10 AC-OF-SM-12D meter 11,742 4,183 11,387
11 AC-OF-SM-24D Idem 24 core meter 13,950 4,152 13,528
12 AC-OF-SM-48D Idem 48 core meter 20,137 4,152 19,529
13 AC-OF-SM-96D Idem 96 core meter 30,178 4,152 29,265
14 DC-OF-SM-12C meter 11,681 3,003 11,328
15 DC-OF-SM-24C Idem 24 core meter 16,460 3,003 15,963
16 DC-OF-SM-48C Idem 48 core meter 26,648 3,003 25,843
17 DC-OF-SM-96C Idem 96 core meter 49,491 3,003 47,995
18 AC-OF-SM-12C meter 15,153 4,152 14,695
19 AC-OF-SM-24C Idem 24 core meter 20,534 4,152 19,914
20 AC-OF-SM-48C Idem 48 core meter 31,993 4,152 31,026
21 AC-OF-SM-96C Idem 96 core meter 55,863 4,152 54,174
22 DC-OF-SM-8-SC meter 11,232 3,003 10,892
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Page 2 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material23 DC-OF-SM-12-SC Idem 12 Core meter 13,927 3,003 13,506
24 DC-OF-SM-24-SC Idem 24 Core meter 18,757 3,003 18,190
25 AC-OF-SM-8-SC meter 13,478 4,152 13,070
26 AC-OF-SM-12-SC Idem 12 Core meter 17,018 4,152 16,503
27 AC-OF-SM-24-SC Idem 24 Core meter 21,224 4,152 20,583
28 SC-OF-SM-24 pcs 822,513 34,167 797,645
29 SC-OF-SM-48 Idem 12 - 48 core pcs 929,217 34,167 901,123
30 SC-OF-SM-96 Idem 12 - 96 core pcs 1,060,758 34,167 1,028,687
31 SC-OF-SM-144 Idem 12 - 144 core pcs 1,474,850 34,167 1,430,260
32 SC-OF-SM-288 Idem 12 - 288 core pcs 2,609,350 34,167 2,530,460
33 OS-SM-1 core - 58,753 -
34 AB-OF-SM-2D meter 2,165 2,412 2,099
35 AB-OF-SM-4D Idem 4 core meter 3,029 2,412 2,938
36 AB-OF-SM-8D Idem 8 core meter 5,626 2,412 5,456
37 AB-OF-SM-12D Idem 12 core meter 7,791 2,412 7,555
38 AB-OF-SM-24D Idem 24 core meter 11,097 3,417 10,761
39 AB-OF-SM-48D Idem 48 core meter 17,528 3,417 16,998
40 AB-OF-SM-72D Idem 72 core meter 28,132 3,417 27,282
41 AB-OF-SM-96D Idem 96 core meter 33,109 3,377 32,108
42 AB-OF-SM-144D Idem 144 core meter 51,071 3,859 49,527
43 AB-OF-SM-288D Idem 288 core meter 97,380 4,824 94,436
44 DC-OF-SM-1A meter 5,173 3,003 5,017
45 DC-OF-SM-2A idem 2 core meter 5,446 3,003 5,281
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Page 3 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material46 DC-OF-SM-1B meter 5,442 3,003 5,278
47 DC-OF-SM-2B idem 2 core meter 5,446 3,036 5,281
48 AC-OF-SM-1B meter 5,446 4,152 5,281
49 AC-OF-SM-2B idem 2 core meter 5,707 4,152 5,534
50 PC-APC-657-2 pcs 82,478 3,036 79,985
51 PC-APC-657-A1 additional per 1 meter pcs 5,173 1,503 5,017
52 PC-UPC-657-2 pcs 68,268 3,036 66,204
53 PC-UPC-657-A1 additional per 1 meter pcs 5,173 1,503 5,017
54 PC-APC-655-2 pcs 79,415 3,036 77,014
55 PC-APC-655-A1 additional per 1 meter pcs 5,173 1,503 5,017
56 PC-UPC-655-2 pcs 61,972 3,036 60,098
57 PC-UPC-655-A1 additional per 1 meter pcs 5,173 1,503 5,017
58 PC-APC-652-2 pcs 77,146 3,036 74,814
59 PC-APC-652-A1 additional per 1 meter pcs 5,173 1,503 5,017
60 PC-UPC-652-2 pcs 59,300 3,036 57,507
61 PC-UPC-652-A1 additional per 1 meter pcs 5,173 1,503 5,017
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Page 4 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material62 ODC-C-48 pcs 5,632,864 4,175,600 5,462,562
63 ODC-C-144 pcs 14,070,069 5,642,327 13,644,680
64 ODC-C-288 pcs 25,226,742 5,684,905 24,464,047
65 ODC-C-576 pcs 66,630,248 5,640,333 64,615,777
66 ODP-CA-8 pcs 1,327,365 136,669 1,287,234
67 ODP-CA-16 pcs 1,588,300 136,669 1,540,280
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Page 5 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material68 ODP-A-8 pcs 1,054,574 136,669 1,022,691
69 ODP-A-16 pcs 1,361,400 136,669 1,320,240
70 ODP-PB-8 pcs 1,021,050 136,427 990,180
71 ODP-PB-16 pcs 1,284,382 136,669 1,245,550
72 ODP-PL-8 pcs 2,376,514 136,669 2,304,664
73 ODP-PL-16 pcs 2,940,034 136,669 2,851,146
74 TC-SM-12 pcs 1,162,802 742,144 1,127,647
75 TC-SM-24 Idem 24 core pcs 1,634,750 1,484,288 1,585,325
76 TC-SM-48 Idem 48 core pcs 3,156,746 2,968,577 3,061,307
77 TC-SM-96 Idem 96 core pcs 5,442,197 5,937,154 5,277,659
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Page 6 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material78 FTB-SM-144SA pcs 11,912,250 525,686 11,552,100
79 TR-FTM-HIGH CAP pcs 16,393,570 525,686 15,897,934
80 RS-IN-SC-1P pcs 72,608 61,846 70,413
81 RS-IN-SC-2P idem 2 port pcs 106,643 125,053 103,419
82 PS-1-2-ODC pcs 299,006 34,000 289,966
83 PS-1-4-ODC Idem, 1 : 4 pcs 396,508 34,000 384,520
84 PS-1-8-ODP Idem, 1 : 8 pcs 631,826 34,000 612,723
85 PS-1-16-ODP Idem, 1 : 16 pcs 975,670 34,000 946,172
86 PS-2-2-ODC pcs 692,045 34,247 671,122
87 PS-2-4-ODC Idem, 2 : 4 pcs 816,840 34,247 792,144
88 SITAC Akuisisi Lahan SITAC ODC Node - 7,421,442 -
89 PU-S7.0-140 pcs 1,166,334 192,875 1,131,072
90 PU-S9.0-140 pcs 1,928,650 195,161 1,870,340
91 PU-C7.0-250 pcs 2,836,250 201,285 2,750,500
92 PU-C9.0-300 pcs 3,392,155 198,867 3,289,598
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Page 7 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs 526,175 60,713 510,267
94 PU-AS set 33,134 40,413 32,132
95 GB-G1 pcs 903,909 408,081 876,581
96 GB-G3 pcs 2,722,800 473,085 2,640,480
97 GB-G-INTG pcs 273,437 164,419 265,170
98 TC-02-ODC pcs 246,029 60,975 238,590
99 PP-OF-IN meter 27,001 4,041 26,185
100 PP-OF-OUT meter 26,680 4,041 25,873
101 DD-S3-1 meter 340,364 60,620 330,073
102 DD-S3-2 idem, 2 pipa meter 680,728 80,827 660,148
103 DD-S3-3 idem, 3 pipa meter 1,021,092 121,240 990,221
104 DD-V4-1 meter 64,761 60,620 62,803
105 DD-V4-2 Idem, 2 pipa meter 129,520 80,950 125,604
106 DD-V5-1 meter 62,619 60,620 60,726
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Page 8 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material107 DD-V5-2 Idem, 2 pipa meter 125,930 80,827 122,122
108 DD-DA-S1 meter 340,364 242,481 330,073
109 DD-DA-S2 idem, 2 pipa meter 680,728 484,962 660,148
110 DD-DA-S4 idem, 4 pipa meter 1,361,457 969,923 1,320,295
111 DD-BSS-S1 meter 438,484 242,481 425,227
112 DD-BSS-S2 Idem, 2 pipa meter 876,889 484,962 850,378
113 DD-BTS-S1 meter 436,783 242,481 423,577
114 DD-BTS-S2 idem, 2 pipa meter 873,565 484,962 847,154
115 DD-BTS-S4 idem, 4 pipa meter 1,736,900 735,171 1,684,387
116 HB-PS-1 meter 152,793 38,653 148,174
117 HB-PS-2 meter 314,514 46,384 305,005
118 HB-PS-4 meter 608,773 54,115 590,367
119 HB-PC-2 meter 517,332 46,384 501,691
120 HB-PC-4 meter 1,013,774 54,115 983,124
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Page 9 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material121 DD-BMR-1 track 1,021,092 22,264,326 990,221
122 DD-BMR-2 idem, 2 pipa track 2,042,185 33,396,489 1,980,443
123 DD-BMR-4 idem, 4 pipa track 4,084,369 44,528,653 3,960,884
124 DC-SD-28-1 meter 9,785 1,643 9,489
125 DC-SD-28-3 idem, 3 pipa meter 29,355 2,145 28,468
126 DC-SD-33-1 meter 10,517 1,643 10,199
127 DC-SD-33-2 idem, 2 pipa meter 21,334 2,136 20,689
128 DC-SD-43-1 meter 23,257 1,643 22,554
129 DC-SD-43-2 idem, 2 pipa meter 46,515 2,136 45,108
130 DCD-PVC-1 meter 14,358 1,623 13,924
131 DD-BM-100-1 meter 340,364 72,159 330,073
132 DD-BM-100-2 Idem, 2 pipa meter 680,728 74,837 660,148
133 DD-BM-50-1 meter 198,538 37,385 192,535
134 DD-BM-50-2 Idem, 2 pipa meter 394,500 37,385 382,573
135 DD-BM-HDPE-40-1 meter - 37,516 -
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter - 37,411 -
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Page 10 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material137 DD-BM-HDPE-50-1 meter - 37,516 -
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter - 37,385 -
139 DD-HDPE-40-1 meter 13,219 1,564 12,820
140 DD-HDPE-40-2 Idem 2 pipa meter 26,440 1,892 25,640
141 DD-HDPE-50-1 meter 22,463 1,564 21,784
142 DD-HDPE-50-2 Idem 2 pipa meter 44,926 1,892 43,568
143 DD-HDPE-40-1C meter 13,756 1,564 13,340
144 DD-HDPE-40-2C idem, 2 pipa meter 27,322 1,892 26,496
145 DD-ROD meter - 2,021 -
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter 39,762 80,827 38,560
147 DD-RV-CONCRETE m3 1,165,313 727,443 1,130,081
148 DD-DS-S1 meter 282,253 169,737 273,720
149 DD-DS-COD1-M meter 27,170 475,966 26,349
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Page 11 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material150 BC-TR-0.4 meter - 13,862 -
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter - 17,594 -
152 BC-TR-1 idem, kedalaman 1 meter meter - 26,390 -
153 BC-TR-2 idem, kedalaman 1,2 meter meter - 31,012 -
154 BC-TR-3 idem, kedalaman 1,3 meter meter - 32,987 -
155 BC-TR-4 idem, kedalaman 1,4 meter meter - 35,329 -
156 BC-TR-5 meter - 37,516 -
157 BCTR-ROCK meter - 214,660 -
158 BD-SK Titik 58,266 80,827 56,504
159 SMD-ABS-2A pcs 275,317 158,292 266,993
160 SMD-ABS-3A idem 3 cabang pcs 300,687 170,987 291,596
161 SMD-ABS-4A idem 4 cabang pcs 839,426 188,089 814,047
162 SMD-ABS-6A idem 6 cabang pcs 702,775 206,898 681,528
163 DD-MDSC-5/3.5 pcs 24,728 520 23,980
164 DD-MDSC-10/8 pcs 26,029 520 25,242
165 DD-MDSC-12/10 pcs 27,461 520 26,630
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Page 12 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material166 DD-MDDI-1A meter 5,928 1,861 5,749
167 DD-MDDI-2A Idem 2 way meter 8,062 2,450 7,818
168 DD-MDDI-4A Idem 4 way meter 12,742 2,805 12,357
169 DD-MDDI-7A Idem 7 way meter 18,073 2,828 17,527
170 DD-MDDI-12A Idem 12 way meter 27,174 3,251 26,353
171 DD-MDDI-19A Idem 19 way meter 37,870 3,785 36,725
172 DD-MDDI-24A Idem 24 way meter 46,271 4,320 44,872
173 DD-MDDI-1B meter 12,014 2,404 11,651
174 DD-MDDI-2B Idem 2 way meter 17,163 2,805 16,645
175 DD-MDDI-4B Idem 4 way meter 30,554 3,206 29,631
176 DD-MDDI-7B Idem 7 way meter 44,728 3,696 43,375
177 DD-MDDI-1C meter 14,198 3,028 13,768
178 DD-MDDI-2C Idem 2 way meter 20,461 3,473 19,842
179 DD-MDDI-4C Idem 4 way meter 36,666 4,321 35,557
180 DD-MDDI-7C Idem 7 way meter 53,959 4,631 52,327
181 DD-MDDB-1A meter 14,781 2,730 14,334
182 DD-MDDB-2A Idem 2 way meter 17,475 3,592 16,946
183 DD-MDDB-4A Idem 4 way meter 24,964 4,115 24,209
184 DD-MDDB-7A Idem 7 way meter 32,328 4,147 31,351
185 DD-MDDB-12A Idem 12 way meter 48,056 4,768 46,603
186 DD-MDDB-19A Idem 19 way meter 61,830 5,551 59,961
187 DD-MDDB-24A Idem 24 way meter 73,644 6,335 71,417
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Page 13 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2
Material Jasa Material188 DD-MDDB-1B meter 24,959 3,527 24,204
189 DD-MDDB-2B Idem 2 way meter 32,328 4,115 31,351
190 DD-MDDB-4B Idem 4 way meter 57,292 4,702 55,560
191 DD-MDDB-7B Idem 7 way meter 76,388 5,421 74,079
192 DD-MDDB-1C meter 29,109 4,441 28,229
193 DD-MDDB-2C Idem 2 way meter 38,069 5,095 36,918
194 DD-MDDB-4C Idem 4 way meter 67,777 6,287 65,727
195 DD-MDDB-7C Idem 7 way meter 90,867 6,792 88,120
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs 14,316 520 13,883
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs 14,316 520 13,883
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs 14,316 520 13,883
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs 6,580,100 2,714,357 6,381,160
200 MH-HH2 pcs 4,603,674 2,066,404 4,464,488
201 HH-PIT-P-HA pcs 867,461 183,294 841,235
202 HH-PIT-P-ODP pcs 2,836,250 273,403 2,750,500
203 HH-PIT-P-ODC pcs 10,755,060 515,884 10,429,896
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs 920,846 714,884 893,006
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core - 59,409 -
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Page 14 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
PENGADAAN KHS OSP-FO TAHUN 2014-2017
Paket 2 Paket 3
Jasa Material Jasa 1.1731
2,948 8,972 3,304
2,948 11,485 3,304
2,948 16,491 3,304
2,948 27,873 3,304
3,587 39,885 4,020
3,587 68,768 4,020
3,581 73,639 4,013
3,980 193,558 4,460
3,980 348,411 4,460
4,107 12,142 4,603
4,076 14,424 4,568
4,076 20,823 4,568
4,076 31,204 4,568
2,948 12,078 3,304
2,948 17,021 3,304
2,948 27,555 3,304
2,948 51,175 3,304
4,076 15,669 4,568
4,076 21,233 4,568
4,076 33,081 4,568
4,076 57,763 4,568
2,948 11,614 3,304
Page 15 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 2 Paket 3
Jasa Material Jasa 2,948 14,401 3,304
2,948 19,395 3,304
4,076 13,936 4,568
4,076 17,597 4,568
4,076 21,946 4,568
33,543 850,498 37,593
33,543 960,832 37,593
33,543 1,096,849 37,593
33,543 1,525,030 37,593
33,543 2,698,130 37,593
57,680 - 64,643
2,368 2,238 2,653
2,368 3,132 2,653
2,368 5,817 2,653
2,368 8,056 2,653
3,354 11,474 3,759
3,354 18,124 3,759
3,354 29,089 3,759
3,315 34,236 3,715
3,789 52,808 4,246
4,736 100,693 5,308
2,948 5,349 3,304
2,948 5,631 3,304
Page 16 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 2 Paket 3
Jasa Material Jasa 2,948 5,627 3,304
2,981 5,631 3,341
4,076 5,631 4,568
4,076 5,901 4,568
2,981 85,284 3,341
1,476 5,349 1,654
2,981 70,591 3,341
1,476 5,349 1,654
2,981 82,117 3,341
1,476 5,349 1,654
2,981 64,081 3,341
1,476 5,349 1,654
2,981 79,771 3,341
1,476 5,349 1,654
2,981 61,318 3,341
1,476 5,349 1,654
Page 17 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 2 Paket 3
Jasa Material Jasa 4,099,340 5,824,515 4,594,232
5,539,281 14,548,786 6,208,009
5,581,081 26,085,052 6,254,855
5,537,323 68,897,262 6,205,815
134,173 1,372,527 150,371
134,173 1,642,340 150,371
Page 18 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 2 Paket 3
Jasa Material Jasa 134,173 1,090,455 150,371
134,173 1,407,720 150,371
133,936 1,055,790 150,105
134,173 1,328,081 150,371
134,173 2,457,372 150,371
134,173 3,040,065 150,371
728,590 1,202,365 816,549
1,457,181 1,690,370 1,633,098
2,914,361 3,264,151 3,266,197
5,828,723 5,627,361 6,532,394
Page 19 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 2 Paket 3
Jasa Material Jasa 516,085 12,317,550 578,389
516,085 16,951,342 578,389
60,716 75,078 68,046
122,769 110,271 137,591
33,379 309,180 37,409
33,379 409,998 37,409
33,379 653,323 37,409
33,379 1,008,866 37,409
33,621 715,591 37,680
33,621 844,632 37,680
7,285,904 - 8,165,492
185,053 1,206,017 206,859
187,298 1,994,270 209,375
193,310 2,932,750 216,113
190,936 3,507,569 213,452
Page 20 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 2 Paket 3
Jasa Material Jasa 59,604 544,078 66,799
39,675 34,262 44,465
400,628 934,664 448,994
464,445 2,815,440 520,515
161,416 282,741 180,903
59,862 254,400 67,089
3,967 27,920 4,446
3,967 27,588 4,446
59,513 351,944 66,698
79,351 703,889 88,931
119,026 1,055,833 133,395
59,513 66,964 66,698
79,472 133,927 89,066
59,513 64,749 66,698
Page 21 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 2 Paket 3
Jasa Material Jasa 79,351 130,214 88,931
238,053 351,944 266,792
476,105 703,889 533,582
952,209 1,407,779 1,067,164
238,053 453,403 266,792
476,105 906,724 533,582
238,053 451,644 266,792
476,105 903,287 533,582
721,744 1,795,996 808,877
37,947 157,992 42,528
45,537 325,215 51,035
53,126 629,485 59,540
45,537 534,934 51,035
53,126 1,048,267 59,540
Page 22 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 2 Paket 3
Jasa Material Jasa 21,857,711 1,055,833 24,496,477
32,786,566 2,111,668 36,744,715
43,715,421 4,223,335 48,992,954
1,613 10,118 1,808
2,105 30,354 2,360
1,613 10,875 1,808
2,097 22,060 2,350
1,613 24,049 1,808
2,097 48,097 2,350
1,594 14,847 1,786
69,122 351,944 77,253
71,751 703,889 80,199
34,982 205,293 38,991
34,982 407,922 38,991
35,111 - 39,136
35,008 - 39,020
Page 23 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 2 Paket 3
Jasa Material Jasa 35,111 - 39,136
34,982 - 38,991
1,536 13,669 1,721
1,858 27,339 2,082
1,536 23,227 1,721
1,858 46,455 2,082
1,536 14,224 1,721
1,858 28,252 2,082
1,984 - 2,223
79,351 41,115 88,931
714,157 1,204,961 800,374
166,637 291,857 186,754
467,273 28,095 523,684
Page 24 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 2 Paket 3
Jasa Material Jasa 11,889 - 13,110
15,553 - 17,217
24,188 - 26,895
28,726 - 31,980
30,665 - 34,153
32,964 - 36,730
35,111 - 39,136
209,020 - 234,040
79,351 60,248 88,931
155,401 284,684 174,162
167,864 310,917 188,129
184,654 867,986 206,946
203,119 726,686 227,641
511 25,569 573
511 26,914 573
511 28,395 573
Page 25 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 2 Paket 3
Jasa Material Jasa 1,827 6,130 2,047
2,405 8,336 2,695
2,754 13,175 3,086
2,776 18,688 3,112
3,191 28,099 3,577
3,716 39,158 4,164
4,241 47,845 4,753
2,360 12,423 2,645
2,754 17,747 3,086
3,148 31,594 3,528
3,629 46,250 4,067
2,972 14,681 3,331
3,410 21,157 3,822
4,242 37,913 4,754
4,546 55,794 5,095
2,680 15,284 3,004
3,527 18,069 3,952
4,040 25,813 4,527
4,072 33,428 4,563
4,681 49,691 5,246
5,449 63,934 6,107
6,219 76,149 6,970
Page 26 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 2 Paket 3
Jasa Material Jasa 3,463 25,808 3,881
4,040 33,428 4,527
4,617 59,242 5,174
5,322 78,987 5,964
4,360 30,100 4,886
5,002 39,364 5,605
6,172 70,083 6,917
6,668 93,959 7,473
511 14,803 573
511 14,803 573
511 14,803 573
2,664,784 6,803,980 2,986,490
2,028,665 4,760,308 2,273,575
179,947 896,976 201,671
268,410 2,932,750 300,814
506,463 11,120,988 567,605
701,828 952,177 786,556
58,324 - 65,365
Page 27 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
PENGADAAN KHS OSP-FO TAHUN 2014-2017
Paket 4 Paket 5
Material Jasa Material 1.0337
7,648 2,856 7,906
9,790 2,856 10,120
14,058 2,856 14,532
23,760 2,856 24,561
34,000 3,475 35,146
58,621 3,475 60,596
62,773 3,469 64,889
164,997 3,856 170,557
297,000 3,856 307,009
10,350 3,979 10,699
12,296 3,949 12,710
17,750 3,949 18,348
26,600 3,949 27,496
10,296 2,856 10,643
14,509 2,856 14,998
23,489 2,856 24,281
43,624 2,856 45,094
13,357 3,949 13,807
18,100 3,949 18,710
28,200 3,949 29,150
49,240 3,949 50,899
9,900 2,856 10,234
Page 28 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 4 Paket 5
Material Jasa Material 12,276 2,856 12,690
16,533 2,856 17,090
11,880 3,949 12,280
15,000 3,949 15,506
18,708 3,949 19,338
725,000 32,500 749,433
819,054 32,500 846,656
935,000 32,500 966,510
1,300,000 32,500 1,343,810
2,300,000 32,500 2,377,510
- 55,886 -
1,908 2,294 1,972
2,670 2,294 2,760
4,959 2,294 5,126
6,867 2,294 7,098
9,781 3,250 10,111
15,450 3,250 15,971
24,797 3,250 25,633
29,184 3,212 30,168
45,016 3,671 46,533
85,835 4,589 88,728
4,560 2,856 4,714
4,800 2,856 4,962
Page 29 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 4 Paket 5
Material Jasa Material 4,797 2,856 4,959
4,800 2,888 4,962
4,800 3,949 4,962
5,030 3,949 5,200
72,700 2,888 75,150
4,560 1,430 4,714
60,175 2,888 62,203
4,560 1,430 4,714
70,000 2,888 72,359
4,560 1,430 4,714
54,625 2,888 56,466
4,560 1,430 4,714
68,000 2,888 70,292
4,560 1,430 4,714
52,270 2,888 54,031
4,560 1,430 4,714
Page 30 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 4 Paket 5
Material Jasa Material 4,965,063 3,971,844 5,132,386
12,402,000 5,367,000 12,819,947
22,236,000 5,407,500 22,985,353
58,730,937 5,365,103 60,710,170
1,170,000 130,000 1,209,429
1,400,000 130,000 1,447,180
Page 31 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 4 Paket 5
Material Jasa Material 929,550 130,000 960,876
1,200,000 130,000 1,240,440
900,000 129,770 930,330
1,132,113 130,000 1,170,265
2,094,768 130,000 2,165,362
2,591,480 130,000 2,678,813
1,024,947 705,930 1,059,488
1,440,943 1,411,860 1,489,502
2,782,500 2,823,720 2,876,270
4,797,000 5,647,440 4,958,659
Page 32 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 4 Paket 5
Material Jasa Material 10,500,000 500,034 10,853,850
14,450,040 500,034 14,937,006
64,000 58,828 66,157
94,000 118,951 97,168
263,558 32,341 272,440
349,500 32,341 361,278
556,920 32,341 575,688
860,000 32,341 888,982
610,000 32,575 630,557
720,000 32,575 744,264
- 7,059,300 -
1,028,060 198,000 1,062,706
1,700,000 200,175 1,757,290
2,500,000 206,000 2,584,250
2,990,000 203,700 3,090,763
Page 33 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 4 Paket 5
Material Jasa Material 463,795 57,750 479,425
29,206 38,441 30,190
796,747 388,168 823,597
2,400,000 450,000 2,480,880
241,020 156,396 249,142
216,861 58,000 224,169
23,800 3,844 24,602
23,517 3,844 24,310
300,012 57,662 310,122
600,025 76,883 620,246
900,037 115,324 930,368
57,083 57,662 59,007
114,165 77,000 118,012
55,195 57,662 57,055
Page 34 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 4 Paket 5
Material Jasa Material 111,000 76,883 114,741
300,012 230,649 310,122
600,025 461,297 620,246
1,200,050 922,594 1,240,492
386,500 230,649 399,525
772,930 461,297 798,978
385,000 230,649 397,975
770,000 461,297 795,949
1,530,983 699,297 1,582,577
134,679 36,767 139,218
277,227 44,121 286,570
536,600 51,474 554,683
456,000 44,121 471,367
893,587 51,474 923,701
Page 35 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 4 Paket 5
Material Jasa Material 900,037 21,177,900 930,368
1,800,075 31,766,850 1,860,738
3,600,149 42,355,800 3,721,474
8,625 1,563 8,916
25,875 2,040 26,747
9,270 1,563 9,582
18,805 2,032 19,439
20,500 1,563 21,191
41,000 2,032 42,382
12,656 1,544 13,083
300,012 74,453 310,122
600,025 77,000 620,246
175,000 41,375 180,898
347,730 41,375 359,449
- 41,500 -
- 41,400 -
Page 36 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 4 Paket 5
Material Jasa Material - 41,500 -
- 41,375 -
11,652 1,488 12,045
23,305 1,800 24,090
19,800 1,488 20,467
39,600 1,800 40,935
12,125 1,488 12,534
24,083 1,800 24,895
- 1,922 -
35,048 76,883 36,229
1,027,160 691,946 1,061,775
248,791 161,454 257,175
23,949 452,740 24,756
Page 37 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 4 Paket 5
Material Jasa Material - 19,000 -
- 22,550 -
- 30,917 -
- 35,313 -
- 37,192 -
- 39,420 -
- 41,500 -
- 210,000 -
51,358 76,883 53,089
242,677 150,568 250,855
265,039 162,643 273,971
739,908 178,911 764,843
619,458 196,802 640,334
21,796 495 22,531
22,943 495 23,716
24,205 495 25,021
Page 38 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 4 Paket 5
Material Jasa Material 5,225 1,770 5,402
7,106 2,330 7,346
11,231 2,668 11,610
15,930 2,690 16,467
23,953 3,092 24,760
33,380 3,600 34,505
40,785 4,109 42,159
10,590 2,287 10,947
15,129 2,668 15,638
26,932 3,050 27,840
39,425 3,516 40,754
12,514 2,880 12,936
18,035 3,304 18,643
32,319 4,110 33,408
47,562 4,405 49,164
13,028 2,597 13,468
15,403 3,417 15,922
22,004 3,914 22,746
28,496 3,945 29,456
42,359 4,535 43,786
54,500 5,280 56,337
64,913 6,026 67,100
Page 39 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 4 Paket 5
Material Jasa Material 22,000 3,355 22,741
28,496 3,914 29,456
50,500 4,473 52,202
67,332 5,156 69,601
25,658 4,224 26,523
33,556 4,846 34,687
59,741 5,980 61,755
80,094 6,461 82,794
12,619 495 13,044
12,619 495 13,044
12,619 495 13,044
5,800,000 2,581,905 5,995,460
4,057,888 1,965,570 4,194,639
764,620 174,350 790,388
2,500,000 260,062 2,584,250
9,480,000 490,711 9,799,476
811,676 680,000 839,029
- 56,510 -
Page 40 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
PENGADAAN KHS OSP-FO TAHUN 2014-2017
Paket 5 Paket 6
Jasa Material Jasa 1.2369
2,700 9,460 3,376
2,700 12,109 3,376
2,700 17,388 3,376
2,700 29,389 3,376
3,285 42,055 4,108
3,285 72,508 4,108
3,280 77,644 4,102
3,645 204,085 4,559
3,645 367,359 4,559
3,762 12,802 4,704
3,733 15,209 4,669
3,733 21,955 4,669
3,733 32,902 4,669
2,700 12,735 3,376
2,700 17,946 3,376
2,700 29,054 3,376
2,700 53,959 3,376
3,733 16,521 4,669
3,733 22,388 4,669
3,733 34,881 4,669
3,733 60,905 4,669
2,700 12,245 3,376
Page 41 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 5 Paket 6
Jasa Material Jasa 2,700 15,184 3,376
2,700 20,450 3,376
3,733 14,694 4,669
3,733 18,554 4,669
3,733 23,140 4,669
30,726 896,753 38,422
30,726 1,013,088 38,422
30,726 1,156,502 38,422
30,726 1,607,970 38,422
30,726 2,844,870 38,422
52,835 - 66,068
2,169 2,360 2,712
2,169 3,303 2,712
2,169 6,134 2,712
2,169 8,494 2,712
3,073 12,098 3,842
3,073 19,110 3,842
3,073 30,671 3,842
3,037 36,098 3,797
3,471 55,680 4,340
4,338 106,169 5,425
2,700 5,640 3,376
2,700 5,937 3,376
Page 42 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 5 Paket 6
Jasa Material Jasa 2,700 5,933 3,376
2,730 5,937 3,414
3,733 5,937 4,669
3,733 6,222 4,669
2,730 89,923 3,414
1,352 5,640 1,691
2,730 74,430 3,414
1,352 5,640 1,691
2,730 86,583 3,414
1,352 5,640 1,691
2,730 67,566 3,414
1,352 5,640 1,691
2,730 84,109 3,414
1,352 5,640 1,691
2,730 64,653 3,414
1,352 5,640 1,691
Page 43 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 5 Paket 6
Jasa Material Jasa 3,754,981 6,141,286 4,695,514
5,073,962 15,340,034 6,344,867
5,112,251 27,503,708 6,392,747
5,072,168 72,644,296 6,342,625
122,902 1,447,173 153,686
122,902 1,731,660 153,686
Page 44 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 5 Paket 6
Jasa Material Jasa 122,902 1,149,760 153,686
122,902 1,484,280 153,686
122,685 1,113,210 153,414
122,902 1,400,310 153,686
122,902 2,591,019 153,686
122,902 3,205,402 153,686
667,386 1,267,757 834,550
1,334,772 1,782,302 1,669,101
2,669,545 3,441,674 3,338,202
5,339,090 5,933,409 6,676,404
Page 45 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 5 Paket 6
Jasa Material Jasa 472,732 12,987,450 591,140
472,732 17,873,254 591,140
55,616 79,162 69,546
112,456 116,269 140,624
30,575 325,995 38,234
30,575 432,297 38,234
30,575 688,854 38,234
30,575 1,063,734 38,234
30,797 754,509 38,511
30,797 890,568 38,511
6,673,862 - 8,345,504
172,387 1,271,607 210,771
174,443 2,102,730 213,342
179,950 3,092,250 220,228
177,775 3,698,331 217,509
Page 46 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 5 Paket 6
Jasa Material Jasa 54,597 573,668 68,272
36,342 36,125 45,445
366,974 985,496 458,892
425,430 2,968,560 531,990
147,857 298,118 184,891
54,833 268,235 68,568
3,634 29,438 4,544
3,634 29,088 4,544
54,514 371,085 68,168
72,685 742,171 90,891
109,027 1,113,256 136,336
54,514 70,606 68,168
72,796 141,211 91,029
54,514 68,271 68,168
Page 47 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 5 Paket 6
Jasa Material Jasa 72,685 137,296 90,891
218,056 371,085 272,673
436,110 742,171 545,345
872,220 1,484,342 1,090,691
218,056 478,062 272,673
436,110 956,037 545,345
218,056 476,207 272,673
436,110 952,413 545,345
661,115 1,893,673 826,709
34,760 166,584 43,466
41,712 342,902 52,160
48,664 663,721 60,853
41,712 564,026 52,160
48,664 1,105,278 60,853
Page 48 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 5 Paket 6
Jasa Material Jasa 20,021,587 1,113,256 25,036,513
30,032,380 2,226,513 37,554,770
40,043,173 4,453,024 50,073,027
1,478 10,668 1,848
1,929 32,005 2,412
1,478 11,466 1,848
1,921 23,260 2,402
1,478 25,356 1,848
1,921 50,713 2,402
1,460 15,654 1,825
64,467 371,085 78,696
66,875 742,171 81,707
33,195 216,458 39,592
33,195 430,107 39,592
33,313 - 39,739
33,219 - 39,621
Page 49 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 5 Paket 6
Jasa Material Jasa 33,313 - 39,739
33,195 - 39,592
1,407 14,412 1,759
1,702 28,826 2,128
1,407 24,491 1,759
1,702 48,981 2,128
1,407 14,997 1,759
1,702 29,788 2,128
1,817 - 2,272
72,685 43,351 90,891
654,166 1,270,494 818,019
152,639 307,730 190,871
428,020 29,623 535,229
Page 50 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 5 Paket 6
Jasa Material Jasa 12,042 - 13,140
15,398 - 17,337
23,308 - 27,228
27,464 - 32,426
29,240 - 34,646
31,347 - 37,280
33,313 - 39,739
192,613 - 238,940
72,685 63,525 90,891
142,347 300,167 178,001
153,763 327,827 192,277
169,142 915,192 211,509
186,057 766,208 232,659
468 26,959 585
468 28,378 585
468 29,939 585
Page 51 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 5 Paket 6
Jasa Material Jasa 1,673 6,463 2,092
2,203 8,790 2,755
2,522 13,892 3,154
2,543 19,704 3,180
2,923 29,627 3,655
3,403 41,288 4,256
3,885 50,447 4,858
2,162 13,098 2,704
2,522 18,713 3,154
2,883 33,312 3,606
3,324 48,765 4,157
2,723 15,479 3,405
3,124 22,308 3,906
3,886 39,975 4,859
4,164 58,829 5,208
2,455 16,115 3,070
3,230 19,052 4,040
3,700 27,217 4,627
3,730 35,246 4,664
4,287 52,393 5,361
4,992 67,411 6,242
5,697 80,291 7,124
Page 52 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 5 Paket 6
Jasa Material Jasa 3,172 27,212 3,966
3,700 35,246 4,627
4,229 62,464 5,288
4,874 83,283 6,095
3,993 31,737 4,994
4,581 41,505 5,729
5,653 73,894 7,070
6,108 99,069 7,638
468 15,608 585
468 15,608 585
468 15,608 585
2,440,933 7,174,020 3,052,328
1,858,250 5,019,202 2,323,697
164,830 945,758 206,117
245,863 3,092,250 307,445
463,918 11,725,812 580,119
642,872 1,003,962 803,896
53,425 - 66,806
Page 53 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Paket 7 Paket 8
Material Jasa Material 1.1503 1.3097
8,797 3,205 10,017
11,261 3,205 12,822
16,171 3,205 18,412
27,331 3,205 31,118
39,110 3,900 44,530
67,431 3,900 76,775
72,208 3,894 82,214
189,796 4,328 216,097
341,639 4,328 388,981
11,906 4,466 13,555
14,144 4,432 16,104
20,418 4,432 23,247
30,598 4,432 34,838
11,843 3,205 13,485
16,690 3,205 19,002
27,020 3,205 30,764
50,181 3,205 57,134
15,364 4,432 17,494
20,820 4,432 23,706
32,438 4,432 36,934
56,641 4,432 64,490
11,388 3,205 12,966
Page 54 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 7 Paket 8
Material Jasa Material 14,121 3,205 16,078
19,018 3,205 21,653
13,666 4,432 15,559
17,255 4,432 19,646
21,520 4,432 24,502
833,968 36,475 949,533
942,158 36,475 1,072,715
1,075,531 36,475 1,224,570
1,495,390 36,475 1,702,610
2,645,690 36,475 3,012,310
- 62,721 -
2,195 2,575 2,499
3,071 2,575 3,497
5,704 2,575 6,495
7,899 2,575 8,994
11,251 3,647 12,810
17,772 3,647 20,235
28,524 3,647 32,477
33,570 3,605 38,222
51,782 4,120 58,957
98,736 5,150 112,418
5,245 3,205 5,972
5,521 3,205 6,287
Page 55 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 7 Paket 8
Material Jasa Material 5,518 3,205 6,283
5,521 3,241 6,287
5,521 4,432 6,287
5,786 4,432 6,588
83,627 3,241 95,215
5,245 1,605 5,972
69,219 3,241 78,811
5,245 1,605 5,972
80,521 3,241 91,679
5,245 1,605 5,972
62,835 3,241 71,542
5,245 1,605 5,972
78,220 3,241 89,060
5,245 1,605 5,972
60,126 3,241 68,458
5,245 1,605 5,972
Page 56 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 7 Paket 8
Material Jasa Material 5,711,312 4,457,601 6,502,743
14,266,021 6,023,384 16,242,899
25,578,071 6,068,837 29,122,489
67,558,197 6,021,255 76,919,908
1,345,851 145,899 1,532,349
1,610,420 145,899 1,833,580
Page 57 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 7 Paket 8
Material Jasa Material 1,069,261 145,899 1,217,432
1,380,360 145,899 1,571,640
1,035,270 145,641 1,178,730
1,302,269 145,899 1,482,728
2,409,612 145,899 2,743,518
2,980,979 145,899 3,394,061
1,178,997 792,265 1,342,373
1,657,516 1,584,530 1,887,203
3,200,710 3,169,061 3,644,240
5,517,989 6,338,122 6,282,631
Page 58 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 7 Paket 8
Material Jasa Material 12,078,150 561,188 13,751,850
16,621,881 561,188 18,925,217
73,619 66,023 83,821
108,128 133,499 123,112
303,171 36,296 345,182
402,030 36,296 457,740
640,625 36,296 729,398
989,258 36,296 1,126,342
701,683 36,559 798,917
828,216 36,559 942,984
- 7,922,652 -
1,182,577 198,908 1,346,450
1,955,510 201,349 2,226,490
2,875,750 207,886 3,274,250
3,439,397 205,305 3,916,003
Page 59 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 7 Paket 8
Material Jasa Material 533,503 64,813 607,432
33,596 43,142 38,251
916,498 435,641 1,043,500
2,760,720 505,035 3,143,280
277,245 175,523 315,664
249,455 65,093 284,023
27,377 4,314 31,171
27,052 4,314 30,800
345,104 64,714 392,926
690,209 86,286 785,853
1,035,313 129,428 1,178,778
65,663 64,714 74,762
131,324 86,417 149,522
63,491 64,714 72,289
Page 60 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 7 Paket 8
Material Jasa Material 127,683 86,286 145,377
345,104 258,857 392,926
690,209 517,714 785,853
1,380,418 1,035,427 1,571,705
444,591 258,857 506,199
889,101 517,714 1,012,306
442,866 258,857 504,235
885,731 517,714 1,008,469
1,761,090 784,821 2,005,128
154,921 41,264 176,389
318,894 49,517 363,084
617,251 57,769 702,785
524,537 49,517 597,223
1,027,893 57,769 1,170,331
Page 61 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 7 Paket 8
Material Jasa Material 1,035,313 23,767,957 1,178,778
2,070,626 35,651,936 2,357,558
4,141,251 47,535,914 4,715,115
9,921 1,754 11,296
29,764 2,289 33,888
10,663 1,754 12,141
21,631 2,281 24,629
23,581 1,754 26,849
47,162 2,281 53,698
14,558 1,733 16,576
345,104 74,236 392,926
690,209 77,094 785,853
201,303 37,112 229,198
399,994 37,112 455,422
- 37,252 -
- 37,140 -
Page 62 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 7 Paket 8
Material Jasa Material - 37,252 -
- 37,112 -
13,403 1,670 15,261
26,808 2,020 30,523
22,776 1,670 25,932
45,552 2,020 51,864
13,947 1,670 15,880
27,703 2,020 31,542
- 2,157 -
40,316 86,286 45,902
1,181,542 776,571 1,345,271
286,184 181,200 325,842
27,549 508,110 31,366
Page 63 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 7 Paket 8
Material Jasa Material - 12,001 -
- 15,985 -
- 25,375 -
- 30,309 -
- 32,418 -
- 34,918 -
- 37,252 -
- 226,360 -
59,077 86,286 67,264
279,151 168,982 317,834
304,874 182,534 347,122
851,116 200,792 969,058
712,563 220,871 811,304
25,072 556 28,546
26,391 556 30,048
27,843 556 31,701
Page 64 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 7 Paket 8
Material Jasa Material 6,011 1,986 6,844
8,174 2,615 9,307
12,919 2,994 14,710
18,325 3,019 20,864
27,553 3,470 31,371
38,397 4,040 43,718
46,915 4,612 53,416
12,181 2,567 13,869
17,402 2,994 19,814
30,980 3,423 35,273
45,351 3,946 51,635
14,395 3,232 16,390
20,746 3,708 23,621
37,176 4,613 42,328
54,710 4,944 62,291
14,987 2,915 17,063
17,718 3,835 20,173
25,312 4,393 28,819
32,779 4,427 37,321
48,725 5,090 55,477
62,691 5,926 71,379
74,669 6,763 85,016
Page 65 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 7 Paket 8
Material Jasa Material 25,307 3,765 28,813
32,779 4,393 37,321
58,090 5,020 66,140
77,452 5,787 88,185
29,515 4,741 33,604
38,599 5,439 43,948
68,721 6,711 78,243
92,133 7,251 104,900
14,516 556 16,527
14,516 556 16,527
14,516 556 16,527
6,671,740 2,897,672 7,596,260
4,667,789 2,205,959 5,314,616
879,542 195,673 1,001,423
2,875,750 291,868 3,274,250
10,904,844 550,725 12,415,956
933,671 763,164 1,063,052
- 63,421 -
Page 66 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Paket 8 Paket 9
Jasa Material Jasa 1.3045
3,331 9,977 3,180
3,331 12,771 3,180
3,331 18,339 3,180
3,331 30,995 3,180
4,053 44,353 3,869
4,053 76,471 3,869
4,046 81,888 3,863
4,497 215,239 4,293
4,497 387,437 4,293
4,641 13,502 4,430
4,606 16,040 4,397
4,606 23,155 4,397
4,606 34,700 4,397
3,331 13,431 3,180
3,331 18,927 3,180
3,331 30,642 3,180
3,331 56,908 3,180
4,606 17,424 4,397
4,606 23,611 4,397
4,606 36,787 4,397
4,606 64,234 4,397
3,331 12,915 3,180
Page 67 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 8 Paket 9
Jasa Material Jasa 3,331 16,014 3,180
3,331 21,567 3,180
4,606 15,497 4,397
4,606 19,568 4,397
4,606 24,405 4,397
37,905 945,763 36,186
37,905 1,068,456 36,186
37,905 1,219,708 36,186
37,905 1,695,850 36,186
37,905 3,000,350 36,186
65,180 - 62,223
2,675 2,489 2,554
2,675 3,483 2,554
2,675 6,469 2,554
2,675 8,958 2,554
3,790 12,759 3,619
3,790 20,155 3,619
3,790 32,348 3,619
3,746 38,071 3,576
4,281 58,723 4,087
5,352 111,972 5,109
3,331 5,949 3,180
3,331 6,262 3,180
Page 68 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 8 Paket 9
Jasa Material Jasa 3,331 6,258 3,180
3,368 6,262 3,215
4,606 6,262 4,397
4,606 6,562 4,397
3,368 94,837 3,215
1,668 5,949 1,592
3,368 78,498 3,215
1,668 5,949 1,592
3,368 91,315 3,215
1,668 5,949 1,592
3,368 71,258 3,215
1,668 5,949 1,592
3,368 88,706 3,215
1,668 5,949 1,592
3,368 68,186 3,215
1,668 5,949 1,592
Page 69 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 8 Paket 9
Jasa Material Jasa 4,632,362 6,476,925 4,422,251
6,259,532 16,178,409 5,975,618
6,306,767 29,006,862 6,020,711
6,257,320 76,614,507 5,973,506
151,619 1,526,265 144,742
151,619 1,826,300 144,742
Page 70 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 8 Paket 9
Jasa Material Jasa 151,619 1,212,598 144,742
151,619 1,565,400 144,742
151,351 1,174,050 144,486
151,619 1,476,841 144,742
151,619 2,732,625 144,742
151,619 3,380,586 144,742
823,326 1,337,043 785,982
1,646,652 1,879,710 1,571,965
3,293,305 3,629,771 3,143,930
6,586,609 6,257,687 6,287,860
Page 71 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 8 Paket 9
Jasa Material Jasa 583,190 13,697,250 556,738
583,190 18,850,077 556,738
68,611 83,488 65,499
138,733 122,623 132,440
37,719 343,811 36,008
37,719 455,923 36,008
37,719 726,502 36,008
37,719 1,121,870 36,008
37,993 795,745 36,269
37,993 939,240 36,269
8,233,262 - 7,859,825
209,270 1,341,104 198,618
211,807 2,217,650 201,040
218,600 3,261,250 207,525
215,918 3,900,455 204,965
Page 72 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 8 Paket 9
Jasa Material Jasa 67,354 605,021 64,299
44,834 38,099 42,800
452,720 1,039,356 432,186
524,835 3,130,800 501,030
182,405 314,411 174,131
67,645 282,895 64,577
4,483 31,047 4,280
4,483 30,678 4,280
67,251 391,366 64,201
89,669 782,733 85,602
134,502 1,174,098 128,402
67,251 74,465 64,201
89,805 148,928 85,732
67,251 72,002 64,201
Page 73 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 8 Paket 9
Jasa Material Jasa 89,669 144,800 85,602
269,006 391,366 256,805
538,011 782,733 513,608
1,076,021 1,565,465 1,027,216
269,006 504,189 256,805
538,011 1,008,287 513,608
269,006 502,233 256,805
538,011 1,004,465 513,608
815,590 1,997,167 778,597
42,881 175,689 40,936
51,458 361,643 49,124
60,034 699,995 57,311
51,458 594,852 49,124
60,034 1,165,684 57,311
Page 74 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 8 Paket 9
Jasa Material Jasa 24,699,785 1,174,098 23,579,474
37,049,677 2,348,198 35,369,211
49,399,570 4,696,394 47,158,948
1,823 11,251 1,740
2,379 33,754 2,271
1,823 12,093 1,740
2,370 24,531 2,262
1,823 26,742 1,740
2,370 53,485 2,262
1,801 16,510 1,719
78,172 391,366 74,162
81,142 782,733 76,998
39,593 228,288 37,333
39,593 453,614 37,333
39,738 - 37,472
39,622 - 37,361
Page 75 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 8 Paket 9
Jasa Material Jasa 39,738 - 37,472
39,593 - 37,333
1,735 15,200 1,657
2,099 30,401 2,004
1,735 25,829 1,657
2,099 51,658 2,004
1,735 15,817 1,657
2,099 31,416 2,004
2,242 - 2,140
89,669 45,720 85,602
807,017 1,339,930 770,413
188,304 324,548 179,763
528,031 31,241 504,081
Page 76 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 8 Paket 9
Jasa Material Jasa 13,497 - 12,421
17,637 - 16,373
27,395 - 25,689
32,523 - 30,584
34,714 - 32,676
37,313 - 35,156
39,738 - 37,472
236,260 - 225,080
89,669 66,997 85,602
175,607 316,572 167,642
189,691 345,743 181,087
208,664 965,210 199,200
229,530 808,083 219,119
577 28,433 551
577 29,929 551
577 31,575 551
Page 77 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 8 Paket 9
Jasa Material Jasa 2,064 6,817 1,971
2,717 9,270 2,594
3,112 14,651 2,971
3,137 20,781 2,995
3,606 31,246 3,443
4,199 43,544 4,008
4,792 53,204 4,575
2,667 13,814 2,546
3,112 19,735 2,971
3,557 35,133 3,396
4,101 51,430 3,915
3,359 16,325 3,207
3,853 23,527 3,679
4,793 42,160 4,576
5,138 62,044 4,905
3,029 16,996 2,891
3,985 20,093 3,804
4,565 28,705 4,358
4,601 37,173 4,392
5,289 55,257 5,049
6,158 71,095 5,879
7,028 84,679 6,709
Page 78 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 8 Paket 9
Jasa Material Jasa 3,913 28,699 3,735
4,565 37,173 4,358
5,217 65,878 4,980
6,013 87,835 5,741
4,926 33,471 4,703
5,652 43,774 5,396
6,974 77,933 6,658
7,535 104,483 7,194
577 16,461 551
577 16,461 551
577 16,461 551
3,011,276 7,566,100 2,874,693
2,292,444 5,293,515 2,188,466
203,344 997,447 194,121
303,310 3,261,250 289,553
572,316 12,366,660 546,358
793,084 1,058,831 757,112
65,908 - 62,918
Page 79 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Paket 10 Paket 11
Material Jasa Material 1.1549 1.3587
8,833 2,897 10,391
11,306 2,897 13,302
16,236 2,897 19,101
27,440 2,897 32,283
39,267 3,525 46,196
67,701 3,525 79,648
72,497 3,520 85,290
190,555 3,912 224,181
343,005 3,912 403,534
11,953 4,037 14,063
14,200 4,006 16,706
20,499 4,006 24,117
30,720 4,006 36,141
11,891 2,897 13,989
16,756 2,897 19,713
27,128 2,897 31,915
50,381 2,897 59,272
15,426 4,006 18,148
20,904 4,006 24,592
32,568 4,006 38,315
56,867 4,006 66,902
11,434 2,897 13,451
Page 80 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 10 Paket 11
Material Jasa Material 14,178 2,897 16,679
19,094 2,897 22,463
13,720 4,006 16,141
17,324 4,006 20,381
21,606 4,006 25,419
837,303 32,971 985,058
945,925 32,971 1,112,849
1,079,832 32,971 1,270,385
1,501,370 32,971 1,766,310
2,656,270 32,971 3,125,010
- 56,696 -
2,204 2,327 2,592
3,084 2,327 3,628
5,727 2,327 6,738
7,931 2,327 9,330
11,296 3,297 13,289
17,843 3,297 20,992
28,638 3,297 33,692
33,705 3,259 39,652
51,989 3,724 61,163
99,131 4,656 116,624
5,266 2,897 6,196
5,544 2,897 6,522
Page 81 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 10 Paket 11
Material Jasa Material 5,540 2,897 6,518
5,544 2,930 6,522
5,544 4,006 6,522
5,809 4,006 6,834
83,961 2,930 98,777
5,266 1,451 6,196
69,496 2,930 81,760
5,266 1,451 6,196
80,843 2,930 95,109
5,266 1,451 6,196
63,086 2,930 74,219
5,266 1,451 6,196
78,533 2,930 92,392
5,266 1,451 6,196
60,367 2,930 71,019
5,266 1,451 6,196
Page 82 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 10 Paket 11
Material Jasa Material 5,734,151 4,029,436 6,746,031
14,323,070 5,444,822 16,850,597
25,680,356 5,485,909 30,212,053
67,828,359 5,442,897 79,797,724
1,351,233 131,885 1,589,679
1,616,860 131,885 1,902,180
Page 83 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 10 Paket 11
Material Jasa Material 1,073,537 131,885 1,262,980
1,385,880 131,885 1,630,440
1,039,410 131,652 1,222,830
1,307,477 131,885 1,538,201
2,419,248 131,885 2,846,161
2,992,900 131,885 3,521,044
1,183,711 716,166 1,392,595
1,664,145 1,432,332 1,957,809
3,213,509 2,864,664 3,780,583
5,540,055 5,729,328 6,517,684
Page 84 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 10 Paket 11
Material Jasa Material 12,126,450 507,284 14,266,350
16,688,351 507,284 19,633,269
73,914 59,681 86,957
108,561 120,676 127,718
304,383 32,810 358,096
403,638 32,810 474,866
643,187 32,810 756,687
993,214 32,810 1,168,482
704,489 33,048 828,807
831,528 33,048 978,264
- 7,161,660 -
1,187,306 187,009 1,396,825
1,963,330 189,215 2,309,790
2,887,250 195,125 3,396,750
3,453,151 192,791 4,062,513
Page 85 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 10 Paket 11
Material Jasa Material 535,637 58,587 630,158
33,730 38,998 39,682
920,163 393,796 1,082,540
2,771,760 456,525 3,260,880
278,354 158,664 327,474
250,453 58,841 294,649
27,487 3,900 32,337
27,160 3,900 31,953
346,484 58,498 407,626
692,969 77,998 815,254
1,039,453 116,996 1,222,880
65,925 58,498 77,559
131,849 78,117 155,116
63,745 58,498 74,993
Page 86 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 10 Paket 11
Material Jasa Material 128,194 77,998 150,816
346,484 233,993 407,626
692,969 467,986 815,254
1,385,938 935,972 1,630,508
446,369 233,993 525,138
892,657 467,986 1,050,180
444,637 233,993 523,100
889,273 467,986 1,046,199
1,768,132 709,437 2,080,147
155,541 37,300 182,988
320,169 44,761 376,668
619,719 52,220 729,078
526,634 44,761 619,567
1,032,004 52,220 1,214,117
Page 87 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 10 Paket 11
Material Jasa Material 1,039,453 21,484,980 1,222,880
2,078,907 32,227,469 2,445,762
4,157,812 42,969,959 4,891,522
9,961 1,586 11,719
29,883 2,070 35,156
10,706 1,586 12,595
21,718 2,061 25,550
23,675 1,586 27,853
47,351 2,061 55,707
14,616 1,566 17,196
346,484 69,988 407,626
692,969 72,572 815,254
202,108 36,430 237,773
401,593 36,430 472,461
- 36,557 -
- 36,455 -
Page 88 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 10 Paket 11
Material Jasa Material - 36,557 -
- 36,430 -
13,457 1,510 15,832
26,915 1,826 31,665
22,867 1,510 26,902
45,734 1,826 53,805
14,003 1,510 16,474
27,813 1,826 32,722
- 1,950 -
40,477 77,998 47,620
1,186,267 701,979 1,395,602
287,329 163,795 338,032
27,659 459,305 32,540
Page 89 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 10 Paket 11
Material Jasa Material - 13,731 -
- 17,332 -
- 25,820 -
- 30,280 -
- 32,186 -
- 34,447 -
- 36,557 -
- 207,500 -
59,313 77,998 69,780
280,268 152,751 329,725
306,094 165,001 360,108
854,520 181,505 1,005,313
715,412 199,656 841,658
25,172 502 29,614
26,497 502 31,173
27,954 502 32,887
Page 90 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 10 Paket 11
Material Jasa Material 6,035 1,796 7,100
8,207 2,364 9,655
12,971 2,707 15,260
18,398 2,729 21,645
27,663 3,137 32,544
38,551 3,652 45,353
47,103 4,169 55,415
12,230 2,320 14,388
17,472 2,707 20,555
31,104 3,094 36,593
45,532 3,567 53,567
14,453 2,922 17,003
20,829 3,352 24,505
37,325 4,170 43,911
54,929 4,469 64,622
15,047 2,635 17,702
17,789 3,467 20,928
25,413 3,971 29,897
32,910 4,002 38,717
48,920 4,601 57,553
62,942 5,357 74,049
74,968 6,113 88,197
Page 91 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 10 Paket 11
Material Jasa Material 25,408 3,404 29,891
32,910 3,971 38,717
58,323 4,538 68,615
77,762 5,231 91,484
29,633 4,285 34,862
38,754 4,916 45,592
68,995 6,067 81,171
92,501 6,555 108,824
14,574 502 17,145
14,574 502 17,145
14,574 502 17,145
6,698,420 2,619,343 7,880,460
4,686,455 1,994,071 5,513,452
883,060 176,878 1,038,889
2,887,250 263,833 3,396,750
10,948,452 497,826 12,880,476
937,405 689,860 1,102,824
- 57,329 -
Page 92 of 104
PENGADAAN KHS OSP-FO TAHUN 2014-2017
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
A Kabel, Penyambungan dan Pekerjaan Sipil
0
1 DC-OF-SM-12D meter
2 DC-OF-SM-24D Idem 24 core meter
3 DC-OF-SM-48D Idem 48 core meter
4 DC-OF-SM-96D Idem 96 core meter
5 DC-OF-SM-144D Idem 144 core meter
6 DC-OF-SM-264D Idem 264 core meter
7 DC-OF-SM-288D Idem 288 core meter
8 DC-OF-SM-432D Idem 432 core meter
9 DC-OF-SM-960D Idem 960 core meter
10 AC-OF-SM-12D meter
11 AC-OF-SM-24D Idem 24 core meter
12 AC-OF-SM-48D Idem 48 core meter
13 AC-OF-SM-96D Idem 96 core meter
14 DC-OF-SM-12C meter
15 DC-OF-SM-24C Idem 24 core meter
16 DC-OF-SM-48C Idem 48 core meter
17 DC-OF-SM-96C Idem 96 core meter
18 AC-OF-SM-12C meter
19 AC-OF-SM-24C Idem 24 core meter
20 AC-OF-SM-48C Idem 48 core meter
21 AC-OF-SM-96C Idem 96 core meter
22 DC-OF-SM-8-SC meter
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Paket 11 Paket 12
Jasa Material Jasa 1.4263
3,525 10,908 4,257
3,525 13,963 4,257
3,525 20,051 4,257
3,525 33,889 4,257
4,290 48,494 5,180
4,290 83,611 5,180
4,283 89,533 5,171
4,760 235,335 5,748
4,760 423,611 5,748
4,912 14,762 5,931
4,875 17,537 5,886
4,875 25,317 5,886
4,875 37,940 5,886
3,525 14,685 4,257
3,525 20,694 4,257
3,525 33,503 4,257
3,525 62,221 4,257
4,875 19,051 5,886
4,875 25,816 5,886
4,875 40,222 5,886
4,875 70,231 5,886
3,525 14,120 4,257
Page 93 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
23 DC-OF-SM-12-SC Idem 12 Core meter
24 DC-OF-SM-24-SC Idem 24 Core meter
25 AC-OF-SM-8-SC meter
26 AC-OF-SM-12-SC Idem 12 Core meter
27 AC-OF-SM-24-SC Idem 24 Core meter
28 SC-OF-SM-24 pcs
29 SC-OF-SM-48 Idem 12 - 48 core pcs
30 SC-OF-SM-96 Idem 12 - 96 core pcs
31 SC-OF-SM-144 Idem 12 - 144 core pcs
32 SC-OF-SM-288 Idem 12 - 288 core pcs
33 OS-SM-1 core
34 AB-OF-SM-2D meter
35 AB-OF-SM-4D Idem 4 core meter
36 AB-OF-SM-8D Idem 8 core meter
37 AB-OF-SM-12D Idem 12 core meter
38 AB-OF-SM-24D Idem 24 core meter
39 AB-OF-SM-48D Idem 48 core meter
40 AB-OF-SM-72D Idem 72 core meter
41 AB-OF-SM-96D Idem 96 core meter
42 AB-OF-SM-144D Idem 144 core meter
43 AB-OF-SM-288D Idem 288 core meter
44 DC-OF-SM-1A meter
45 DC-OF-SM-2A idem 2 core meter
Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
Paket 11 Paket 12
Jasa Material Jasa 3,525 17,509 4,257
3,525 23,581 4,257
4,875 16,944 5,886
4,875 21,395 5,886
4,875 26,683 5,886
40,118 1,034,068 48,445
40,118 1,168,217 48,445
40,118 1,333,591 48,445
40,118 1,854,190 48,445
40,118 3,280,490 48,445
68,986 - 83,304
2,832 2,721 3,419
2,832 3,808 3,419
2,832 7,073 3,419
2,832 9,794 3,419
4,012 13,951 4,844
4,012 22,036 4,844
4,012 35,368 4,844
3,965 41,625 4,788
4,531 64,206 5,472
5,665 122,426 6,840
3,525 6,504 4,257
3,525 6,846 4,257
Page 94 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
46 DC-OF-SM-1B meter
47 DC-OF-SM-2B idem 2 core meter
48 AC-OF-SM-1B meter
49 AC-OF-SM-2B idem 2 core meter
50 PC-APC-657-2 pcs
51 PC-APC-657-A1 additional per 1 meter pcs
52 PC-UPC-657-2 pcs
53 PC-UPC-657-A1 additional per 1 meter pcs
54 PC-APC-655-2 pcs
55 PC-APC-655-A1 additional per 1 meter pcs
56 PC-UPC-655-2 pcs
57 PC-UPC-655-A1 additional per 1 meter pcs
58 PC-APC-652-2 pcs
59 PC-APC-652-A1 additional per 1 meter pcs
60 PC-UPC-652-2 pcs
61 PC-UPC-652-A1 additional per 1 meter pcs
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
Paket 11 Paket 12
Jasa Material Jasa 3,525 6,842 4,257
3,565 6,846 4,305
4,875 6,846 5,886
4,875 7,174 5,886
3,565 103,692 4,305
1,765 6,504 2,132
3,565 85,827 4,305
1,765 6,504 2,132
3,565 99,841 4,305
1,765 6,504 2,132
3,565 77,912 4,305
1,765 6,504 2,132
3,565 96,988 4,305
1,765 6,504 2,132
3,565 74,553 4,305
1,765 6,504 2,132
Page 95 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
62 ODC-C-48 pcs
63 ODC-C-144 pcs
64 ODC-C-288 pcs
65 ODC-C-576 pcs
66 ODP-CA-8 pcs
67 ODP-CA-16 pcs
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Paket 11 Paket 12
Jasa Material Jasa 4,902,844 7,081,669 5,920,431
6,625,025 17,688,973 8,000,050
6,675,018 31,715,207 8,060,420
6,622,683 83,767,935 7,997,223
160,472 1,668,771 193,778
160,472 1,996,820 193,778
Page 96 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
68 ODP-A-8 pcs
69 ODP-A-16 pcs
70 ODP-PB-8 pcs
71 ODP-PB-16 pcs
72 ODP-PL-8 pcs
73 ODP-PL-16 pcs
74 TC-SM-12 pcs
75 TC-SM-24 Idem 24 core pcs
76 TC-SM-48 Idem 48 core pcs
77 TC-SM-96 Idem 96 core pcs
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
Paket 11 Paket 12
Jasa Material Jasa 160,472 1,325,817 193,778
160,472 1,711,560 193,778
160,188 1,283,670 193,435
160,472 1,614,732 193,778
160,472 2,987,768 193,778
160,472 3,696,228 193,778
871,400 1,461,882 1,052,259
1,742,800 2,055,217 2,104,519
3,485,600 3,968,680 4,209,037
6,971,200 6,841,961 8,418,074
Page 97 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
78 FTB-SM-144SA pcs
79 TR-FTM-HIGH CAP pcs
80 RS-IN-SC-1P pcs
81 RS-IN-SC-2P idem 2 port pcs
82 PS-1-2-ODC pcs
83 PS-1-4-ODC Idem, 1 : 4 pcs
84 PS-1-8-ODP Idem, 1 : 8 pcs
85 PS-1-16-ODP Idem, 1 : 16 pcs
86 PS-2-2-ODC pcs
87 PS-2-4-ODC Idem, 2 : 4 pcs
88 SITAC Akuisisi Lahan SITAC ODC Node
89 PU-S7.0-140 pcs
90 PU-S9.0-140 pcs
91 PU-C7.0-250 pcs
92 PU-C9.0-300 pcs
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
Pengadaan dan Pemasangan Close Rack FTM High Capacity
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
Paket 11 Paket 12
Jasa Material Jasa 617,242 14,976,150 745,351
617,242 20,610,092 745,351
72,617 91,283 87,689
146,833 134,072 177,308
39,922 375,912 48,207
39,922 498,492 48,207
39,922 794,335 48,207
39,922 1,226,618 48,207
40,211 870,043 48,557
40,211 1,026,936 48,557
8,714,000 - 10,522,593
219,301 1,466,322 283,124
221,986 2,424,710 286,366
229,176 3,565,750 295,049
226,337 4,264,637 291,620
Page 98 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs
94 PU-AS set
95 GB-G1 pcs
96 GB-G3 pcs
97 GB-G-INTG pcs
98 TC-02-ODC pcs
99 PP-OF-IN meter
100 PP-OF-OUT meter
101 DD-S3-1 meter
102 DD-S3-2 idem, 2 pipa meter
103 DD-S3-3 idem, 3 pipa meter
104 DD-V4-1 meter
105 DD-V4-2 Idem, 2 pipa meter
106 DD-V5-1 meter
Pengadaan dan Pemasangan Asesoris tiang eksisting
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
Paket 11 Paket 12
Jasa Material Jasa 71,287 661,511 86,082
47,452 41,657 57,300
479,155 1,136,400 578,603
555,480 3,423,120 670,770
193,055 343,767 233,124
71,595 309,309 86,455
4,745 33,946 5,730
4,745 33,542 5,730
71,178 427,907 85,951
94,904 855,816 114,602
142,356 1,283,723 171,902
71,178 81,417 85,951
95,049 162,834 114,776
71,178 78,725 85,951
Page 99 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
107 DD-V5-2 Idem, 2 pipa meter
108 DD-DA-S1 meter
109 DD-DA-S2 idem, 2 pipa meter
110 DD-DA-S4 idem, 4 pipa meter
111 DD-BSS-S1 meter
112 DD-BSS-S2 Idem, 2 pipa meter
113 DD-BTS-S1 meter
114 DD-BTS-S2 idem, 2 pipa meter
115 DD-BTS-S4 idem, 4 pipa meter
116 HB-PS-1 meter
117 HB-PS-2 meter
118 HB-PS-4 meter
119 HB-PC-2 meter
120 HB-PC-4 meter
Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
Paket 11 Paket 12
Jasa Material Jasa 94,904 158,319 114,602
284,713 427,907 343,805
569,425 855,816 687,609
1,138,850 1,711,631 1,375,219
284,713 551,265 343,805
569,425 1,102,430 687,609
284,713 549,126 343,805
569,425 1,098,251 687,609
863,212 2,183,641 1,042,372
45,385 192,093 54,805
54,463 395,409 65,767
63,540 765,353 76,727
54,463 650,393 65,767
63,540 1,274,523 76,727
Page 100 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
121 DD-BMR-1 track
122 DD-BMR-2 idem, 2 pipa track
123 DD-BMR-4 idem, 4 pipa track
124 DC-SD-28-1 meter
125 DC-SD-28-3 idem, 3 pipa meter
126 DC-SD-33-1 meter
127 DC-SD-33-2 idem, 2 pipa meter
128 DC-SD-43-1 meter
129 DC-SD-43-2 idem, 2 pipa meter
130 DCD-PVC-1 meter
131 DD-BM-100-1 meter
132 DD-BM-100-2 Idem, 2 pipa meter
133 DD-BM-50-1 meter
134 DD-BM-50-2 Idem, 2 pipa meter
135 DD-BM-HDPE-40-1 meter
136 DD-BM-HDPE-40-2 Idem, 2 pipa meter
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Paket 11 Paket 12
Jasa Material Jasa 26,142,000 1,283,723 31,567,778
39,213,000 2,567,447 47,351,667
52,284,000 5,134,893 63,135,555
1,929 12,302 2,330
2,518 36,906 3,041
1,929 13,222 2,330
2,508 26,822 3,029
1,929 29,239 2,330
2,508 58,478 3,029
1,906 18,051 2,301
81,861 427,907 106,174
85,005 855,816 109,970
41,029 249,603 56,868
41,029 495,967 56,868
41,184 - 57,054
41,060 - 56,905
Page 101 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
137 DD-BM-HDPE-50-1 meter
138 DD-BM-HDPE-50-2 Idem, 2 pipa meter
139 DD-HDPE-40-1 meter
140 DD-HDPE-40-2 Idem 2 pipa meter
141 DD-HDPE-50-1 meter
142 DD-HDPE-50-2 Idem 2 pipa meter
143 DD-HDPE-40-1C meter
144 DD-HDPE-40-2C idem, 2 pipa meter
145 DD-ROD meter
146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter
147 DD-RV-CONCRETE m3
148 DD-DS-S1 meter
149 DD-DS-COD1-M meter
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
Paket 11 Paket 12
Jasa Material Jasa 41,184 - 57,054
41,029 - 56,868
1,837 16,619 2,218
2,222 33,240 2,683
1,837 28,241 2,218
2,222 56,481 2,683
1,837 17,294 2,218
2,222 34,350 2,683
2,373 - 2,865
94,904 49,989 114,602
854,138 1,465,038 1,031,415
199,299 354,851 240,663
558,862 34,158 674,854
Page 102 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
150 BC-TR-0.4 meter
151 BC-TR-0.6 idem, kedalaman 0,6 meter meter
152 BC-TR-1 idem, kedalaman 1 meter meter
153 BC-TR-2 idem, kedalaman 1,2 meter meter
154 BC-TR-3 idem, kedalaman 1,3 meter meter
155 BC-TR-4 idem, kedalaman 1,4 meter meter
156 BC-TR-5 meter
157 BCTR-ROCK meter
158 BD-SK Titik
159 SMD-ABS-2A pcs
160 SMD-ABS-3A idem 3 cabang pcs
161 SMD-ABS-4A idem 4 cabang pcs
162 SMD-ABS-6A idem 6 cabang pcs
163 DD-MDSC-5/3.5 pcs
164 DD-MDSC-10/8 pcs
165 DD-MDSC-12/10 pcs
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
Pengadaan dan Pemasangan Straight Connector 10/8 mm
Pengadaan dan Pemasangan Straight Connector 12/10 mm
Paket 11 Paket 12
Jasa Material Jasa 13,410 - 23,515
17,792 - 28,807
28,120 - 41,279
33,547 - 47,832
35,866 - 50,632
38,616 - 53,953
41,184 - 57,054
249,180 - 308,220
94,904 73,252 114,602
185,861 346,130 224,437
200,767 378,025 242,436
220,848 1,055,331 266,685
242,932 883,533 293,353
611 31,088 738
611 32,724 738
611 34,524 738
Page 103 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
166 DD-MDDI-1A meter
167 DD-MDDI-2A Idem 2 way meter
168 DD-MDDI-4A Idem 4 way meter
169 DD-MDDI-7A Idem 7 way meter
170 DD-MDDI-12A Idem 12 way meter
171 DD-MDDI-19A Idem 19 way meter
172 DD-MDDI-24A Idem 24 way meter
173 DD-MDDI-1B meter
174 DD-MDDI-2B Idem 2 way meter
175 DD-MDDI-4B Idem 4 way meter
176 DD-MDDI-7B Idem 7 way meter
177 DD-MDDI-1C meter
178 DD-MDDI-2C Idem 2 way meter
179 DD-MDDI-4C Idem 4 way meter
180 DD-MDDI-7C Idem 7 way meter
181 DD-MDDB-1A meter
182 DD-MDDB-2A Idem 2 way meter
183 DD-MDDB-4A Idem 4 way meter
184 DD-MDDB-7A Idem 7 way meter
185 DD-MDDB-12A Idem 12 way meter
186 DD-MDDB-19A Idem 19 way meter
187 DD-MDDB-24A Idem 24 way meter
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Paket 11 Paket 12
Jasa Material Jasa 2,185 7,453 2,638
2,876 10,136 3,473
3,293 16,019 3,977
3,321 22,721 4,010
3,817 34,164 4,609
4,444 47,610 5,366
5,072 58,172 6,125
2,823 15,104 3,409
3,293 21,578 3,977
3,765 38,413 4,546
4,340 56,232 5,241
3,555 17,849 4,293
4,078 25,724 4,925
5,073 46,096 6,126
5,438 67,837 6,566
3,206 18,582 3,871
4,218 21,969 5,093
4,831 31,385 5,834
4,870 40,643 5,880
5,598 60,416 6,760
6,518 77,733 7,870
7,438 92,585 8,982
Page 104 of 104
NO DESIGNATOR URAIAN PEKERJAAN SATUAN
188 DD-MDDB-1B meter
189 DD-MDDB-2B Idem 2 way meter
190 DD-MDDB-4B Idem 4 way meter
191 DD-MDDB-7B Idem 7 way meter
192 DD-MDDB-1C meter
193 DD-MDDB-2C Idem 2 way meter
194 DD-MDDB-4C Idem 4 way meter
195 DD-MDDB-7C Idem 7 way meter
196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs
197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs
198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs
B Manhole, Perbaikan dan Modifikasi
199 MH-HH1 pcs
200 MH-HH2 pcs
201 HH-PIT-P-HA pcs
202 HH-PIT-P-ODP pcs
203 HH-PIT-P-ODC pcs
204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs
205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
Paket 11 Paket 12
Jasa Material Jasa 4,141 31,379 5,001
4,831 40,643 5,834
5,521 72,028 6,667
6,365 96,036 7,686
5,214 36,596 6,296
5,982 47,861 7,223
7,382 85,209 8,914
7,975 114,239 9,631
611 17,998 738
611 17,998 738
611 17,998 738
3,187,104 8,272,540 3,848,588
2,426,300 5,787,766 2,929,879
215,218 1,090,578 259,886
321,021 3,565,750 387,648
605,734 13,521,324 731,454
839,392 1,157,693 1,013,608