RENCANA KERJA TAHUNAN (RKT) TA. 2016 BAGIAN...

2
1. E/ PENYUSUNAN PROGRAM, ANGGARAN DAN RENCANA KERJA / 521119/ RAKERNIS 1 PKT X 2. AB/ PENGKAJIAN DAN ANLISIS REFORMASI BIROKRASI/521119/RBP 1 PKT X X X X 3. BX/PENGADAAN PERALATAN KANTOR POLRES /521811/BIAYA KEPERLUAN PERKANTORAN 12 OT X X X X X X X X X X X X 4. BX/PENGADAAN PERALATAN KANTOR POLRES /521811/BIAYA PENGGANTIAN INVENTARIS LAMA DAN / ATAU PEMBELIAN INVENTARIS PERS BARU 3 OT X X X 5. AF/PENYUSUNAN PROGRAM DAN ANGGARAN/521219/PENYUSUNAN PROGRAM DAN ANGGARAN POLRES 1 PKT X X X X I GEDE MAHARTA, SH KOMPOL NRP 68120260 4.800.000 Rp AGUST SEP KEPOLISIAN NEGARA REPUBLIK INDONESIA DAERAH NUSA TENGGARA BARAT RESORT SUMBAWA BARAT 10.000.000 Rp 24.280.000 Rp BAGIAN PERENCANAAN 18.240.000 Rp 48.500.000 Rp JUMLAH ANGGARAN 105.820.000 Rp Taliwang, 10 Januari 2016 KEPALA BAGIAN PERENCANAAN OKT NOP RENCANA KERJA TAHUNAN (RKT) TA. 2016 VOLUME ANGGARAN KOMPONEN / SUB KOMPONEN /AKUN / DETAIL NO BULAN JAN FEB MAR APR MEI JUN DES JUL

Transcript of RENCANA KERJA TAHUNAN (RKT) TA. 2016 BAGIAN...

1. E/ PENYUSUNAN PROGRAM, ANGGARAN DAN

RENCANA KERJA / 521119/ RAKERNIS 1 PKT X

2.AB/ PENGKAJIAN DAN ANLISIS REFORMASI

BIROKRASI/521119/RBP1 PKT X X X X

3.BX/PENGADAAN PERALATAN KANTOR POLRES

/521811/BIAYA KEPERLUAN PERKANTORAN 12 OT X X X X X X X X X X X X

4.BX/PENGADAAN PERALATAN KANTOR POLRES

/521811/BIAYA PENGGANTIAN INVENTARIS LAMA

DAN / ATAU PEMBELIAN INVENTARIS PERS BARU

3 OT X X X

5.

AF/PENYUSUNAN PROGRAM DAN

ANGGARAN/521219/PENYUSUNAN PROGRAM DAN

ANGGARAN POLRES

1 PKT X X X X

I GEDE MAHARTA, SH

KOMPOL NRP 68120260

4.800.000Rp

AGUST SEP

KEPOLISIAN NEGARA REPUBLIK INDONESIA

DAERAH NUSA TENGGARA BARAT

RESORT SUMBAWA BARAT

10.000.000Rp

24.280.000Rp

BAGIAN PERENCANAAN

18.240.000Rp

48.500.000Rp

JUMLAH ANGGARAN 105.820.000Rp

Taliwang, 10 Januari 2016

KEPALA BAGIAN PERENCANAAN

OKT NOP

RENCANA KERJA TAHUNAN (RKT) TA. 2016

VOLUME ANGGARANKOMPONEN / SUB KOMPONEN /AKUN / DETAIL NO

BULAN

JAN FEB MAR APR MEI JUN DESJUL