RAB JALAN TAHAP 1 12,523,100,000.00Rp
RAB JALAN TAHAP 2 14,928,100,000.00Rp
RAB JALAN TAHAP 3 2,673,900,000.00Rp
RAB GERBANG JALAN 696,100,000.00Rp
RAB RTH 4,217,500,000.00Rp
RAB PEDESTRIAN 2,693,400,000.00Rp
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PENYUSUNAN TATA BANGUNAN DAN LINGKUNGAN RTH
TAHUN ANGGARAN 2013
NO URAIAN PEKERJAAN TOTAL
JUMLAH 37,732,100,000.00Rp
PPN 10% 3,773,210,000.00Rp
GRAND TOTAL 41,505,310,000.00Rp
DIBULATKAN 41,505,300,000.00Rp
Terbilang : EMPAT PULUH SATU MILYAR LIMA RATUS LIMA JUTA TIGA RATUS RIBU RUPIAH
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
JALAN TYPE JL.01 P = 3,60 M , P = 40,00 M 222,171,478.83Rp
JALAN TYPE JL.02 L= 3.60 M, P = 40.22 M 223,393,421.97Rp
JALAN TYPE JL.KASUARI L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.03 L= 3.60 M, P = 40.26 M 223,615,593.45Rp
JALAN TYPE JL.04 L= 4.60 M, P = 40.29 M 262,802,978.73Rp
JALAN TYPE JL.05 L= 4,10 M, P = 40,28 M 98,854,951.44Rp
JALAN TYPE JL.06 L= 4,10 M, P = 40.20 M 242,749,132.19Rp
JALAN TYPE JL.07 L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.08 L= 4.20 M, P = 40.11 M 98,815,846.33Rp
JALAN TYPE JL.LORONG I L= 3.10 M, P = 40.36 M 95,246,640.60Rp
JALAN TYPE JL.09 L= 3.6 M, P = 40.00 M 222,171,478.83Rp
NO URAIAN PEKERJAAN TOTAL
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
JALAN TYPE JL.10 L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.11 L= 5,4 M, P = 40.16 M 293,070,898.39Rp
JALAN TYPE JL.JALUR 7 L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.12 L= 3.6 M, P = 41,45 M 230,225,194.94Rp
JALAN TYPE JL.13 L= 3.6 M, P = 882,81 M 5,347,789,283.17Rp
JALAN TYPE JL.14 L= 3.8 M, P = 191,26 M 1,099,359,885.20Rp
JALAN TYPE JL.15 L= 4,10 M, P = 304,00 M 1,835,714,830.47Rp
JUMLAH 11,384,667,529.89Rp
PPN 10% 1,138,466,752.99Rp
GRAND TOTAL 12,523,134,282.88Rp
DIBULATKAN 12,523,100,000.00Rp
Terbilang : DUA BELAS MILYAR LIMA RATUS DUA PULUH TIGA JUTA SERATUS RIBU RUPIAH
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4 5 6=(4x5)
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan dan pembersihan jalan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 185.01 19,000.00 3,515,228.00
I. 3,515,228.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.14 90,000.00 2,352,870.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.02 477,000.00 1,918,494.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.08 1,740,850.00 24,505,945.45 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.14 1,505,355.00 39,354,495.77 ▫ Waterproofing Drainase m2 85.27 167,320.00 14,266,774.05
II. 82,398,579.26 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.72 1,740,850.00 37,809,172.98 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.20 1,740,850.00 63,015,288.30 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.79 253,157.31 36,655,153.42
III. 137,479,614.70 223,393,421.97
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN
SUB JUMLAH TYPE JL.01
SUB JUMLAH TYPE JL.02
SUB JUMLAH TYPE JL.KASUARI
JALAN TYPE JL.02 L= 3.60 M, P = 40.22 M
JALAN TYPE JL.KASUARI L= 3.60 M, P = 40.00 M
JALAN TYPE JL.03 L= 3.60 M, P = 40.26 M
JALAN TYPE JL.01 L= 3.60 M, P = 40.00 M
2
RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
1 Pekerjaan Persiapan m2 185.20 19,000.00 3,518,724.00 I. 3,518,724.00
II. PEKERJAAN DRAINASE1 Pek. Galian Tanah Drainase m3 26.17 90,000.00 2,355,210.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.03 477,000.00 1,920,402.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.09 1,740,850.00 24,530,317.35 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.17 1,505,355.00 39,393,635.00 ▫ Waterproofing Drainase m2 85.35 167,320.00 14,280,962.78
II. 82,480,527.13 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.74 1,740,850.00 37,846,775.34 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.23 1,740,850.00 63,077,958.90 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.94 253,157.31 36,691,608.08
III. 137,616,342.32 223,615,593.45
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 225.62 19,000.00 4,286,856.00
I. 4,286,856.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.19 90,000.00 2,356,965.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.03 477,000.00 1,921,833.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.10 1,740,850.00 24,548,596.28 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.19 1,505,355.00 39,422,989.42 ▫ Waterproofing Drainase m2 85.41 167,320.00 14,291,604.34
II. 82,541,988.03 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 27.80 1,740,850.00 48,395,804.09 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 46.33 1,740,850.00 80,659,673.48 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 185.33 253,157.31 46,918,657.14
III. 175,974,134.70 262,802,978.73
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 205.43 19,000.00 3,903,132.00
I. 3,903,132.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.18 90,000.00 2,356,380.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.03 477,000.00 1,921,356.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.10 1,740,850.00 24,542,503.30 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.18 1,505,355.00 39,413,204.61 ▫ Waterproofing Drainase m2 85.39 167,320.00 14,288,057.15
II. 82,521,501.06 III. PEKERJAAN JALAN
1 Finishing Lapisan Rabatan Beton t = 5 cm m3 8.26 1,505,355.00 12,430,318.38 III. 12,430,318.38
98,854,951.44
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 205.02 19,000.00 3,895,380.00
I. 3,895,380.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.13 90,000.00 2,351,700.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.02 477,000.00 1,917,540.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.07 1,740,850.00 24,493,759.50 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.13 1,505,355.00 39,334,926.15 ▫ Waterproofing Drainase m2 85.22 167,320.00 14,259,679.68
II. 82,357,605.33 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 24.72 1,740,850.00 43,039,034.55 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 41.21 1,740,850.00 71,731,724.25 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 164.82 253,157.31 41,725,388.06
III. 156,496,146.86 242,749,132.19
SUB JUMLAH TYPE JL.03
SUB JUMLAH TYPE JL.04
SUB JUMLAH TYPE JL.05
SUB JUMLAH TYPE JL.06
JALAN TYPE JL.06 L= 4,10 M, P = 40.20 M
JALAN TYPE JL.07 L= 3.6 M, P = 40.00 M
JALAN TYPE JL.04 L= 4.60 M, P = 40.29 M
JALAN TYPE JL.05 L= 4,10 M, P = 40,28 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 208.57 19,000.00 3,962,868.00
I. 3,962,868.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.07 90,000.00 2,346,435.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.01 477,000.00 1,913,247.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.04 1,740,850.00 24,438,922.73 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.07 1,505,355.00 39,246,862.88 ▫ Waterproofing Drainase m2 85.03 167,320.00 14,227,755.02
II. 82,173,222.63 III. PEKERJAAN JALAN
1 Finishing Lapisan Rabatan Beton t = 5 cm m3 8.42 1,505,355.00 12,679,755.70 III. 12,679,755.70
98,815,846.33
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 165.48 19,000.00 3,144,044.00
I. 3,144,044.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.23 90,000.00 2,361,060.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.04 477,000.00 1,925,172.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.13 1,740,850.00 24,591,247.10 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.23 1,505,355.00 39,491,483.07 ▫ Waterproofing Drainase m2 85.56 167,320.00 14,316,434.62
II. 82,685,396.79 III. PEKERJAAN JALAN
1 Finishing Lapisan Rabatan Beton t = 5 cm m3 6.26 1,505,355.00 9,417,199.81 III. 9,417,199.81
95,246,640.60
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
JALAN TYPE JL.LORONG I L= 3.10 M, P = 40.36 M
SUB JUMLAH TYPE JL.LORONG I
JALAN TYPE JL.09 L= 3.6 M, P = 40.00 M
SUB JUMLAH TYPE JL.09
SUB JUMLAH TYPE JL.08
SUB JUMLAH TYPE JL.07
JALAN TYPE JL.08 L= 4.20 M, P = 40.11 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 257.02 19,000.00 4,883,456.00
I. 4,883,456.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.10 90,000.00 2,349,360.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.02 477,000.00 1,915,632.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.06 1,740,850.00 24,469,387.60 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.10 1,505,355.00 39,295,786.92 ▫ Waterproofing Drainase m2 85.14 167,320.00 14,245,490.94
II. 82,275,657.46 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 32.53 1,740,850.00 56,629,154.16 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 54.22 1,740,850.00 94,381,923.60 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 216.86 253,157.31 54,900,707.17
III. 205,911,784.93 293,070,898.39
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 190.67 19,000.00 3,622,730.00
I. 3,622,730.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.94 90,000.00 2,424,825.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.15 477,000.00 1,977,165.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.51 1,740,850.00 25,255,381.38 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.94 1,505,355.00 40,558,027.09 ▫ Waterproofing Drainase m2 87.87 167,320.00 14,703,077.68
II. 84,918,476.14 III. PEKERJAAN JALAN
JALAN TYPE JL.12 L= 3.6 M, P = 41,45 M
SUB JUMLAH TYPE JL.10
JALAN TYPE JL.11 L= 5,4 M, P = 40.16 M
SUB JUMLAH TYPE JL.11
JALAN TYPE JL.JALUR 7 L= 3.6 M, P = 40.00 M
SUB JUMLAH TYPE JL.JALUR 7
JALAN TYPE JL.10 L= 3.6 M, P = 40.00 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 22.38 1,740,850.00 38,965,445.55 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 37.31 1,740,850.00 64,942,409.25 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 149.22 253,157.31 37,776,134.00
III. 141,683,988.80 230,225,194.94
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan dan pembersihan jalan m2 4,060.93 19,000.00 77,157,594.00
I. 77,157,594.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 573.83 90,000.00 51,644,385.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 88.28 477,000.00 42,110,037.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 308.98 1,740,850.00 537,893,925.98 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 573.83 1,505,355.00 863,812,590.91 ▫ Waterproofing Drainase m2 1,871.56 167,320.00 313,148,950.70
II. 1,808,609,889.59 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 476.72 1,740,850.00 829,893,485.79 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 794.53 1,740,850.00 1,383,155,809.65 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 3,178.12 253,157.31 804,563,301.72 4 Pekerjaan trotoar jalan dengan Paving Block m2 1,235.93 119,505.00 147,700,292.67 5 Pekerjaan Kanstin m 3,531.24 84,024.00 296,708,909.76
III. 3,462,021,799.59 5,347,789,283.17
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 918.05 19,000.00 17,442,912.00
I. 17,442,912.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 124.32 90,000.00 11,188,710.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 19.13 477,000.00 9,123,102.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 66.94 1,740,850.00 116,534,239.85 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 124.32 1,505,355.00 187,144,228.25 ▫ Waterproofing Drainase m2 405.47 167,320.00 67,843,441.18
II. 391,833,721.28 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 109.02 1,740,850.00 189,784,333.47 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 181.70 1,740,850.00 316,307,222.45 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 726.79 253,157.31 183,991,696.00
III. 690,083,251.92 1,099,359,885.20
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 1,550.40 19,000.00 29,457,600.00
I. 29,457,600.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 197.60 90,000.00 17,784,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 30.40 477,000.00 14,500,800.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 106.40 1,740,850.00 185,226,440.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 197.60 1,505,355.00 297,458,148.00 ▫ Waterproofing Drainase m2 644.48 167,320.00 107,834,393.60
II. 622,803,781.60 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 186.96 1,740,850.00 325,469,316.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 311.60 1,740,850.00 542,448,860.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 1,246.40 253,157.31 315,535,272.87
III. 1,183,453,448.87 1,835,714,830.47
SUB JUMLAH TYPE JL.12
SUB JUMLAH TYPE JL.15
JALAN TYPE JL.13 L= 3.6 M, P = 882,81 M
SUB JUMLAH TYPE JL.07
JALAN TYPE JL.14 L= 3.8 M, P = 191,26 M
SUB JUMLAH TYPE JL.14
JALAN TYPE JL.15 L= 4,10 M, P = 304,00 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
a b c
1 1 M2 MEMBERSIHKAN LAPANGAN 19,000.00 2 1 M3 GALIAN TANAH SEDALAM 1 M 90,000.00 3 1 M2 PENGASPALAN DENGAN HOTMIX tebal 5 CM 253,157.31 4 1 M3 URUGAN PASIR 477,000.00 5 1 M3 PASANGAN BATU KALI 1,740,850.00 6 11 M3 BETON READY MIX 1,505,355.00 7 1 M2 COATING WATERPROOFING 167,320.00 8 1 KG PEKERJAAN PEMBESIAN DENGAN BESI ULIR U-39 16,879.50 9 1 M2 PEKERJAAN PASANGAN PAVING BLOK 119,505.00
10 1 M2 PASANGAN KANSTIN 84,024.00
HARGA SATUAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
No. Jenis Pekerjaan Jumlah Harga Rp
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M2 PENGASPALAN DENGAN HOTMIX, tebal = 5 cm
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Asphal M2 1.2000 126,500.00 151,800.00 2 filter kg 0.0057 400,000.00 2,280.00 3 Agregat halus / Pasir Beton m3 0.0299 450,000.00 13,455.00 4 Kayu Bakar m3 0.0300 2,346,000.00 70,380.00 5 Alat Bantu ls 0.1069 23,791.50 2,543.31
TENAGA KERJA1 Pekerja oh 0.0876 115,000.00 10,074.00 2 Mandor oh 0.0175 150,000.00 2,625.00
SEWA ALAT1 Tandem Roller jam 0.0118
253,157.31
4 1M3 URUGAN PASIRNO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Pasir Urug m3 1.2000 367,500.00 441,000.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Mandor oh 0.0100 150,000.00 1,500.00 3 Tukang Gali oh -4 Kepala Tukang oh -
477,000.00
5 1M3 PASANGAN BATU KALINO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Batu Belah 15/20 m3 1.1000 620,000.00 682,000.00 2 Semen Portland zak 7.8400 85,000.00 666,400.00 3 Pasir Pasang m3 0.3140 400,000.00 125,600.00
TENAGA KERJA1 Pekerja oh 1.5000 115,000.00 172,500.00 2 Tukang Batu oh 0.6000 125,000.00 75,000.00 3 Kepala Tukang oh 0.0600 135,000.00 8,100.00 4 Mandor oh 0.0750 150,000.00 11,250.00
1,740,850.00 6 1M3 BETON READY MIX f'c = 25 Mpa
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
(SNI 28535:2008)
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
JUMLAH
JUMLAH
KEBUTUHAN
Analisa Harga Satuan Pekerjaan
(SNI 28535:2008)NO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00
TENAGA KERJA1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,355.00 7 1M2 COATING WATERPROOFING
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Waterproofing m3 1.6000 85,000.00 136,000.00 TENAGA KERJA
1 Pekerja oh 0.1200 115,000.00 13,800.00 2 Tukang Batu oh 0.1200 125,000.00 15,000.00 3 Kepala Tukang oh 0.0120 135,000.00 1,620.00 4 Mandor oh 0.0060 150,000.00 900.00
167,320.00 8 1KG PEKERJAAN PEMBESIAN DENGAN BESI BETON ULIR U-39
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi Beton Ulir U-39 kg 1.0500 14,000.00 14,700.00 2 Kawat Beton kg 0.0150 24,000.00 360.00
TENAGA KERJA1 Pekerja oh 0.0070 115,000.00 805.00 2 TukangBesi oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
16,879.50 9 1m2 PEKERJAAN PEMASANGAN PAVING STONE ( Blok ) Tbl. 8 CM ABU-ABU
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paving Stone Abu-abu persegi panjang tbl.8cm m2 1.0500 95,600.00 100,380.00 TENAGA KERJA
1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0250 150,000.00 3,750.00
119,505.00 10 1m PEKERJAAN PEMASANGAN KANSTIN TRAP UK. 15.25.40 cm K-175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen Portland kg 0.0454 85,000.00 3,859.00 2 Pasir Pasang kg 0.0054 400,000.00 2,160.00 3 Kanstin Trap uk. 15.25.40 cm kg 1.1000 56,800.00 62,480.00
TENAGA KERJA1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0010 150,000.00 150.00
84,024.00
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Kepala Tukang 135,000.00Rp Per oh6 Mandor 150,000.00Rp Per oh7 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Bata merah 750.00Rp per buah2 Batako 4,200.00Rp per buah3 Batu belah 620,000.00Rp per m³4 Batu split 1/2 1,000,000.00Rp per m³5 Batu split 2/3 1,000,000.00Rp per m³6 Batu split 3/5 850,000.00Rp per m³7 Glass block 20 x 20 cm 17,000.00Rp per kg8 Pasir batu/sirtu 300,000.00Rp per m³9 Pasir beton 450,000.00Rp per m³
10 Pasir pasang 400,000.00Rp per m³11 Pasir urug 367,500.00Rp per m³12 Rooster 12 X 11 X 24 cm 7,260.00Rp per buah13 Semen 1,700.00Rp per kg14 Semen Warna 3,571.45Rp per kg15 Waterproofing coating Elastomeric Acrylic/ Terpasang 52,500.00Rp per m²16 Waterproofing Membran/terpasang 75,000.00Rp per m²17 Griil tutup gutter 268,000.00Rp per m²18 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³19 Paving Block 95,600.00Rp per m220 Kanstin 56,800.00Rp per m1
BAHAN KAYU1 KAYU KELAS II 3,732,000.00Rp PER M³2 KAYU KELAS III 5 x 7 x 400 2,346,000.00Rp PER M³3 KAYU KELAS III 5 x 7 x 400 6,250.00Rp PER M
BAHAN PEMBESIAN1 BESI BJTD-39 14,000.00Rp PER KG2 BESI BJTP-24 12,500.00Rp PER KG
PER KGLAIN-LAIN
1 AIR 250.00Rp PER LTR2 TANAH URUG 133,500.00Rp PER M³3 PAKU 21,500.00Rp PER KG4 MUR 2,500.00Rp PER BH5 KUNCI GEMBOK 60,500.00Rp PER SET6 ENGSEL 42,000.00Rp PER PSG7 KACA NAKO + RANGKA 143,000.00Rp PER UNIT8 BILLBOARD UK. 80 X 120 CM 544,500.00Rp PER UNIT9 MINYAK BEGISTING 24,500.00Rp PER LTR
10 MENI 31,000.00Rp PER KG11 KAWAT LAS 26,900.00Rp PER KG12 SOLAR 5,000.00Rp PER LTR
NO
DAFTAR HARGA BAHAN DAN UPAHPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan
URAIAN HARGA BAHANNO SATUAN13 MINYAK PELUMAS 35,000.00Rp PER LTR14 WATER PROOFING BITHUTANE SHEET 3000 /TERPASANG 237,600.00Rp PER M215 LOS KERJA DAN GUDANG 16,200,000.00Rp PER ls16 SIGNAGE ROOM 86,000.00Rp PER LS17 EXCAVATOR 381,250.00Rp PER JAM18 BACKHOE kap. Bucket 1 m3 350,000.00Rp PER JAM19 BULDOZER 350,000.00Rp PER JAM20 DUMPTRUCK 6 TON 250,000.00Rp PER JAM21 Wheel Loader 542,928.57Rp PER JAM22 Dump truck 269,028.57Rp PER JAM23 Motor Grader 542,928.57Rp PER JAM24 Vibrator Roller 416,428.57Rp PER JAM25 Water Tanker 262,428.57Rp PER JAM26 Pneumatic Tire Roller 280,028.57Rp PER JAM27 MOBILISASI ALAT BERAT 100,000,000.00Rp LS28 LAPIS PENIGIKAT 11,000.00Rp PER M229 ASPAL HOTMIX (AC) 126,500.00Rp PER M2
Harga Upah dan Bahan
JALAN TYPE JL.16 L= 3.6 M, P = 757,96 M 4,209,927,352.43Rp
JALAN TYPE JL.17 L= 3.1 M, P = 225,62 M 1,143,902,044.67Rp
JALAN TYPE JL.18 L= 3.8 M, P = 159,60 M 1,031,403,596.11Rp
JALAN TYPE JL.19 L= 5.1 M, P = 488,78 M 3,424,897,559.38Rp
JALAN TYPE JL.KASUARI L= 4.1 M, P = 622,82 M 3,760,923,596.67Rp
JUMLAH 13,571,054,149.26Rp
PPN 10% 1,357,105,414.93Rp
GRAND TOTAL 14,928,159,564.19Rp
DIBULATKAN 14,928,100,000.00Rp
Terbilang : EMPAT BELAS MILYAR SEMBILAN RATUS DUA PULUH DELAPAN JUTA SERATUS RIBU RUPIAH
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
NO URAIAN PEKERJAAN TOTAL
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4 5 6=(4x5)
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 3,486.62 19,000.00 66,245,704.00
I. 66,245,704.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 492.67 90,000.00 44,340,660.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 75.80 477,000.00 36,154,692.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 265.29 1,740,850.00 461,823,133.10 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 492.67 1,505,355.00 741,649,269.27 ▫ Waterproofing Drainase m2 1,606.88 167,320.00 268,862,358.46
II. 1,552,830,112.83 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 409.30 1,740,850.00 712,527,119.64 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 682.16 1,740,850.00 1,187,545,199.40 3 Lapisan Aphalt ( Hotmix ) tebal 5 cm m2 2,728.66 253,157.31 690,779,216.56
III. 2,590,851,535.60 4,209,927,352.43
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 925.04 19,000.00 17,575,798.00
I. 17,575,798.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 146.65 90,000.00 13,198,770.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 22.56 477,000.00 10,762,074.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 78.97 1,740,850.00 137,469,701.95 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 146.65 1,505,355.00 220,764,826.82 ▫ Waterproofing Drainase m2 478.31 167,320.00 80,031,565.41
II. 462,226,938.17 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 104.91 1,740,850.00 182,638,318.31 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 174.86 1,740,850.00 304,397,197.18 3 Lapisan Aphalt ( Hotmix ) tebal 5 cm m2 699.42 253,157.31 177,063,793.02
III. 664,099,308.50 1,143,902,044.67
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 766.08 19,000.00 14,555,520.00
I. 14,555,520.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 103.74 90,000.00 9,336,600.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 15.96 477,000.00 7,612,920.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 55.74 1,740,850.00 97,036,719.85 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 103.74 1,505,355.00 156,165,527.70 ▫ Waterproofing Drainase m2 338.35 167,320.00 56,613,056.64
II. 326,764,824.19 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 109.02 1,740,850.00 189,784,333.47 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 181.70 1,740,850.00 316,307,222.45 3 Lapisan Aphalt ( Hotmix ) tebal 5 cm m2 726.79 253,157.31 183,991,696.00
2
RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
NO. URAIAN PEKERJAAN SATUAN VOLUME
SUB JUMLAH TYPE JL.16
JALAN TYPE JL.17 L= 3.1 M, P = 225,62 M
SUB JUMLAH TYPE JL.17
JALAN TYPE JL.18 L= 3.8 M, P = 159,60 M
JALAN TYPE JL.16 L= 3.6 M, P = 757,96 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
III. 690,083,251.92 1,031,403,596.11
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 2,981.56 19,000.00 56,649,602.00
I. 56,649,602.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 317.71 90,000.00 28,593,630.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 48.88 477,000.00 23,314,806.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 171.07 1,740,850.00 297,812,432.05 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 317.71 1,505,355.00 478,261,820.99 ▫ Waterproofing Drainase m2 1,036.21 167,320.00 173,379,259.55
II. 1,001,361,948.59 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 373.92 1,740,850.00 650,932,887.20 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 623.19 1,740,850.00 1,084,888,145.33 3 Lapisan Aphalt ( Hotmix ) tebal 5 cm m2 2,492.78 253,157.31 631,064,976.27
III. 2,366,886,008.79 3,424,897,559.38
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 3,176.38 19,000.00 60,351,258.00
I. 60,351,258.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 404.83 90,000.00 36,434,970.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 62.28 477,000.00 29,708,514.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 217.99 1,740,850.00 379,482,668.95 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 404.83 1,505,355.00 609,417,380.72 ▫ Waterproofing Drainase m2 1,320.40 167,320.00 220,928,551.64
II. 1,275,972,085.30 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 383.03 1,740,850.00 666,805,261.16 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 638.39 1,740,850.00 1,111,342,101.93 3 Lapisan Aphalt ( Hotmix ) tebal 5 cm m2 2,553.56 253,157.31 646,452,890.29
III. 2,424,600,253.37 3,760,923,596.67
SUB JUMLAH TYPE JL.14
JALAN TYPE JL.19 L= 5.1 M, P = 488,78 M
SUB JUMLAH TYPE JL.07
JALAN TYPE JL.KASUARI L= 4.1 M, P = 622,82 M
SUB JUMLAH TYPE JL.07
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
a b c
1 1 M2 MEMBERSIHKAN LAPANGAN 19,000.00 2 1 M3 GALIAN TANAH SEDALAM 1 M 90,000.00 3 1 M2 PENGASPALAN DENGAN HOTMIX tebal 5 CM 253,157.31 4 1 M3 URUGAN PASIR 477,000.00 5 1 M3 PASANGAN BATU KALI 1,740,850.00 6 11 M3 BETON READY MIX 1,505,355.00 7 1 M2 COATING WATERPROOFING 167,320.00 8 1 KG PEKERJAAN PEMBESIAN DENGAN BESI ULIR U-39 16,879.50 9 1 M2 PEKERJAAN PASANGAN PAVING BLOK 119,505.00 10 1 M2 PASANGAN KANSTIN 84,024.00
HARGA SATUAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
No. Jenis Pekerjaan Jumlah Harga Rp
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M2 PENGASPALAN DENGAN HOTMIX, tebal = 5 cm
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Asphal M2 1.2000 126,500.00 151,800.00 2 filter kg 0.0057 400,000.00 2,280.00 3 Agregat halus / Pasir Beton m3 0.0299 450,000.00 13,455.00 4 Kayu Bakar m3 0.0300 2,346,000.00 70,380.00 5 Alat Bantu ls 0.1069 23,791.50 2,543.31
TENAGA KERJA1 Pekerja oh 0.0876 115,000.00 10,074.00 2 Mandor oh 0.0175 150,000.00 2,625.00
SEWA ALAT1 Tandem Roller jam 0.0118
253,157.31
4 1M3 URUGAN PASIRNO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Pasir Urug m3 1.2000 367,500.00 441,000.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Mandor oh 0.0100 150,000.00 1,500.00 3 Tukang Gali oh -4 Kepala Tukang oh -
477,000.00
5 1M3 PASANGAN BATU KALINO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Batu Belah 15/20 m3 1.1000 620,000.00 682,000.00 2 Semen Portland zak 7.8400 85,000.00 666,400.00 3 Pasir Pasang m3 0.3140 400,000.00 125,600.00
TENAGA KERJA1 Pekerja oh 1.5000 115,000.00 172,500.00 2 Tukang Batu oh 0.6000 125,000.00 75,000.00 3 Kepala Tukang oh 0.0600 135,000.00 8,100.00 4 Mandor oh 0.0750 150,000.00 11,250.00
1,740,850.00 6 1M3 BETON READY MIX f'c = 25 Mpa
JUMLAH
JUMLAH
KEBUTUHAN
(SNI 28535:2008)
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
(SNI 28535:2008)NO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00
TENAGA KERJA1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,355.00 7 1M2 COATING WATERPROOFING
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Waterproofing m3 1.6000 85,000.00 136,000.00 TENAGA KERJA
1 Pekerja oh 0.1200 115,000.00 13,800.00 2 Tukang Batu oh 0.1200 125,000.00 15,000.00 3 Kepala Tukang oh 0.0120 135,000.00 1,620.00 4 Mandor oh 0.0060 150,000.00 900.00
167,320.00 8 1KG PEKERJAAN PEMBESIAN DENGAN BESI BETON ULIR U-39
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi Beton Ulir U-39 kg 1.0500 14,000.00 14,700.00 2 Kawat Beton kg 0.0150 24,000.00 360.00
TENAGA KERJA1 Pekerja oh 0.0070 115,000.00 805.00 2 TukangBesi oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
16,879.50 9 1m2 PEKERJAAN PEMASANGAN PAVING STONE ( Blok ) Tbl. 8 CM ABU-ABU
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paving Stone Abu-abu persegi panjang tbl.8cm m2 1.0500 95,600.00 100,380.00 TENAGA KERJA
1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0250 150,000.00 3,750.00
119,505.00 10 1m PEKERJAAN PEMASANGAN KANSTIN TRAP UK. 15.25.40 cm K-175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen Portland kg 0.0454 85,000.00 3,859.00 2 Pasir Pasang kg 0.0054 400,000.00 2,160.00 3 Kanstin Trap uk. 15.25.40 cm kg 1.1000 56,800.00 62,480.00
TENAGA KERJA1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0010 150,000.00 150.00
84,024.00
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Kepala Tukang 135,000.00Rp Per oh6 Mandor 150,000.00Rp Per oh7 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Bata merah 750.00Rp per buah2 Batako 4,200.00Rp per buah3 Batu belah 620,000.00Rp per m³4 Batu split 1/2 1,000,000.00Rp per m³5 Batu split 2/3 1,000,000.00Rp per m³6 Batu split 3/5 850,000.00Rp per m³7 Glass block 20 x 20 cm 17,000.00Rp per kg8 Pasir batu/sirtu 300,000.00Rp per m³9 Pasir beton 450,000.00Rp per m³
10 Pasir pasang 400,000.00Rp per m³11 Pasir urug 367,500.00Rp per m³12 Rooster 12 X 11 X 24 cm 7,260.00Rp per buah13 Semen 1,700.00Rp per kg14 Semen Warna 3,571.45Rp per kg15 Waterproofing coating Elastomeric Acrylic/ Terpasang 52,500.00Rp per m²16 Waterproofing Membran/terpasang 75,000.00Rp per m²17 Griil tutup gutter 268,000.00Rp per m²18 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³19 Paving Block 95,600.00Rp per m220 Kanstin 56,800.00Rp per m1
BAHAN KAYU1 KAYU KELAS II 3,732,000.00Rp PER M³2 KAYU KELAS III 5 x 7 x 400 2,346,000.00Rp PER M³3 KAYU KELAS III 5 x 7 x 400 6,250.00Rp PER M
BAHAN PEMBESIAN1 BESI BJTD-39 14,000.00Rp PER KG2 BESI BJTP-24 12,500.00Rp PER KG
PER KGLAIN-LAIN
1 AIR 250.00Rp PER LTR2 TANAH URUG 133,500.00Rp PER M³3 PAKU 21,500.00Rp PER KG4 MUR 2,500.00Rp PER BH5 KUNCI GEMBOK 60,500.00Rp PER SET6 ENGSEL 42,000.00Rp PER PSG7 KACA NAKO + RANGKA 143,000.00Rp PER UNIT8 BILLBOARD UK. 80 X 120 CM 544,500.00Rp PER UNIT9 MINYAK BEGISTING 24,500.00Rp PER LTR
10 MENI 31,000.00Rp PER KG11 KAWAT LAS 26,900.00Rp PER KG12 SOLAR 5,000.00Rp PER LTR
NO
DAFTAR HARGA BAHAN DAN UPAHPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan
URAIAN HARGA BAHANNO SATUAN13 MINYAK PELUMAS 35,000.00Rp PER LTR14 WATER PROOFING BITHUTANE SHEET 3000 /TERPASANG 237,600.00Rp PER M215 LOS KERJA DAN GUDANG 16,200,000.00Rp PER ls16 SIGNAGE ROOM 86,000.00Rp PER LS17 EXCAVATOR 381,250.00Rp PER JAM18 BACKHOE kap. Bucket 1 m3 350,000.00Rp PER JAM19 BULDOZER 350,000.00Rp PER JAM20 DUMPTRUCK 6 TON 250,000.00Rp PER JAM21 Wheel Loader 542,928.57Rp PER JAM22 Dump truck 269,028.57Rp PER JAM23 Motor Grader 542,928.57Rp PER JAM24 Vibrator Roller 416,428.57Rp PER JAM25 Water Tanker 262,428.57Rp PER JAM26 Pneumatic Tire Roller 280,028.57Rp PER JAM27 MOBILISASI ALAT BERAT 100,000,000.00Rp LS28 LAPIS PENIGIKAT 11,000.00Rp PER M229 ASPAL HOTMIX (AC) 126,500.00Rp PER M2
Harga Upah dan Bahan
JALAN TYPE JL.01 P = 3,60 M , P = 40,00 M 222,171,478.83Rp
JALAN TYPE JL. B L= 4.10 M, P = 40.00 M 242,749,132.19Rp
JALAN TYPE JL. C L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.D L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.E L= 3.10 M, P = 40.00 M 188,612,796.61Rp
JALAN TYPE JL.F L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.G L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.H L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.I L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.Gg. ANGGUR L= 3.60 M, P = 40.00 M 222,171,478.83Rp
JALAN TYPE JL.Gg. DURIAN L= 3.6 M, P = 40.00 M 222,171,478.83Rp
JUMLAH 2,430,905,238.30Rp
PPN 10% 243,090,523.83Rp
GRAND TOTAL 2,673,995,762.13Rp
DIBULATKAN 2,673,900,000.00Rp TERBILANG
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
DUA MILYAR ENAM RATUS TUJUH PULUH TIGA JUTA SEMBILAN RATUS RIBU RUPIAH
NO URAIAN PEKERJAAN TOTAL
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4 5 6=(4x5)
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan dan pembersihan jalan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 205.02 19,000.00 3,895,380.00
I. 3,895,380.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.13 90,000.00 2,351,700.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.02 477,000.00 1,917,540.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.07 1,740,850.00 24,493,759.50 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.13 1,505,355.00 39,334,926.15 ▫ Waterproofing Drainase m2 85.22 167,320.00 14,259,679.68
II. 82,357,605.33 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 24.72 1,740,850.00 43,039,034.55 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 41.21 1,740,850.00 71,731,724.25 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 164.82 253,157.31 41,725,388.06
III. 156,496,146.86 242,749,132.19
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
JALAN TYPE JL. A L= 3.60 M, P = 40.00 M
2
RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
NO. URAIAN PEKERJAAN SATUAN VOLUME
SUB JUMLAH TYPE JL. A
SUB JUMLAH TYPE JL. B
SUB JUMLAH TYPE JL. C
JALAN TYPE JL. B L= 4.10 M, P = 40.00 M
JALAN TYPE JL. C L= 3.60 M, P = 40.00 M
JALAN TYPE JL.D L= 3.60 M, P = 40.00 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 164.00 19,000.00 3,116,000.00
I. 3,116,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 167,320.00 -
II. 67,759,130.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 18.60 1,740,850.00 32,379,810.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 31.00 1,740,850.00 53,966,350.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 124.00 253,157.31 31,391,506.61
III. 117,737,666.61 188,612,796.61
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00
JALAN TYPE JL.F L= 3.60 M, P = 40.00 M
SUB JUMLAH TYPE JL. D
SUB JUMLAH TYPE JL. E
SUB JUMLAH TYPE JL. F
SUB JUMLAH TYPE JL. G
JALAN TYPE JL.G L= 3.6 M, P = 40.00 M
JALAN TYPE JL.H L= 3.6 M, P = 40.00 M
JALAN TYPE JL.E L= 3.10 M, P = 40.00 M
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
II. PEKERJAAN DRAINASE1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan m2 184.00 19,000.00 3,496,000.00
I. 3,496,000.00 II. PEKERJAAN DRAINASE
1 Pek. Galian Tanah Drainase m3 26.00 90,000.00 2,340,000.00 2 Pek. Pasir Urug t = 10 cm Bawah Drainase m3 4.00 477,000.00 1,908,000.00 3 Pek. Pas. Batu Kali Kosong Bawah Drainase m3 14.00 1,740,850.00 24,371,900.00 4 Pek. Saluran Drainase▫ Beton F'c = 25 Mpa m3 26.00 1,505,355.00 39,139,230.00 ▫ Waterproofing Drainase m2 84.80 167,320.00 14,188,736.00
II. 81,947,866.00 III. PEKERJAAN JALAN
1 Lapisan Perkerasan atas ( LPA ) Pas. Batu Pecah m3 21.60 1,740,850.00 37,602,360.00 2 Lapisan Perksan Bawah ( LPB ) Pas. Batu Belah m3 36.00 1,740,850.00 62,670,600.00 3 Lapisan Asphalt ( Hotmix ) t = 5 cm m2 144.00 253,157.31 36,454,652.83
III. 136,727,612.83 222,171,478.83
SUB JUMLAH TYPE JL. I
SUB JUMLAH TYPE JL.H
JALAN TYPE JL.I L= 3.60 M, P = 40.00 M
JALAN TYPE JL.Gg. ANGGUR L= 3.60 M, P = 40.00 M
SUB JUMLAH TYPE JL. ANGGUR
JALAN TYPE JL.Gg. DURIAN L= 3.6 M, P = 40.00 M
SUB JUMLAH TYPE JL. DURIAN
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
a b c
1 1 M2 MEMBERSIHKAN LAPANGAN 19,000.00 2 1 M3 GALIAN TANAH SEDALAM 1 M 90,000.00 3 1 M2 PENGASPALAN DENGAN HOTMIX tebal 5 CM 253,157.31 4 1 M3 URUGAN PASIR 477,000.00 5 1 M3 PASANGAN BATU KALI 1,740,850.00 6 11 M3 BETON READY MIX 1,505,355.00 7 1 M2 COATING WATERPROOFING 167,320.00 8 1 KG PEKERJAAN PEMBESIAN DENGAN BESI ULIR U-39 16,879.50 9 1 M2 PEKERJAAN PASANGAN PAVING BLOK 119,505.00
10 1 M2 PASANGAN KANSTIN 84,024.00
HARGA SATUAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
No. Jenis Pekerjaan Jumlah Harga Rp
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M2 PENGASPALAN DENGAN HOTMIX, tebal = 5 cm
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Asphal M2 1.2000 126,500.00 151,800.00 2 filter kg 0.0057 400,000.00 2,280.00 3 Agregat halus / Pasir Beton m3 0.0299 450,000.00 13,455.00 4 Kayu Bakar m3 0.0300 2,346,000.00 70,380.00 5 Alat Bantu ls 0.1069 23,791.50 2,543.31
TENAGA KERJA1 Pekerja oh 0.0876 115,000.00 10,074.00 2 Mandor oh 0.0175 150,000.00 2,625.00
SEWA ALAT1 Tandem Roller jam 0.0118
253,157.31
4 1M3 URUGAN PASIRNO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Pasir Urug m3 1.2000 367,500.00 441,000.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Mandor oh 0.0100 150,000.00 1,500.00 3 Tukang Gali oh -4 Kepala Tukang oh -
477,000.00
5 1M3 PASANGAN BATU KALINO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Batu Belah 15/20 m3 1.1000 620,000.00 682,000.00 2 Semen Portland zak 7.8400 85,000.00 666,400.00 3 Pasir Pasang m3 0.3140 400,000.00 125,600.00
TENAGA KERJA1 Pekerja oh 1.5000 115,000.00 172,500.00 2 Tukang Batu oh 0.6000 125,000.00 75,000.00 3 Kepala Tukang oh 0.0600 135,000.00 8,100.00 4 Mandor oh 0.0750 150,000.00 11,250.00
1,740,850.00 6 1M3 BETON READY MIX f'c = 25 Mpa
JUMLAH
JUMLAH
KEBUTUHAN
(SNI 28535:2008)
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
(SNI 28535:2008)NO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00
TENAGA KERJA1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,355.00 7 1M2 COATING WATERPROOFING
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Waterproofing m3 1.6000 85,000.00 136,000.00 TENAGA KERJA
1 Pekerja oh 0.1200 115,000.00 13,800.00 2 Tukang Batu oh 0.1200 125,000.00 15,000.00 3 Kepala Tukang oh 0.0120 135,000.00 1,620.00 4 Mandor oh 0.0060 150,000.00 900.00
167,320.00 8 1KG PEKERJAAN PEMBESIAN DENGAN BESI BETON ULIR U-39
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi Beton Ulir U-39 kg 1.0500 14,000.00 14,700.00 2 Kawat Beton kg 0.0150 24,000.00 360.00
TENAGA KERJA1 Pekerja oh 0.0070 115,000.00 805.00 2 TukangBesi oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
16,879.50 9 1m2 PEKERJAAN PEMASANGAN PAVING STONE ( Blok ) Tbl. 8 CM ABU-ABU
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paving Stone Abu-abu persegi panjang tbl.8cm m2 1.0500 95,600.00 100,380.00 TENAGA KERJA
1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0250 150,000.00 3,750.00
119,505.00 10 1m PEKERJAAN PEMASANGAN KANSTIN TRAP UK. 15.25.40 cm K-175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen Portland kg 0.0454 85,000.00 3,859.00 2 Pasir Pasang kg 0.0054 400,000.00 2,160.00 3 Kanstin Trap uk. 15.25.40 cm kg 1.1000 56,800.00 62,480.00
TENAGA KERJA1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0010 150,000.00 150.00
84,024.00
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Kepala Tukang 135,000.00Rp Per oh6 Mandor 150,000.00Rp Per oh7 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Bata merah 750.00Rp per buah2 Batako 4,200.00Rp per buah3 Batu belah 620,000.00Rp per m³4 Batu split 1/2 1,000,000.00Rp per m³5 Batu split 2/3 1,000,000.00Rp per m³6 Batu split 3/5 850,000.00Rp per m³7 Glass block 20 x 20 cm 17,000.00Rp per kg8 Pasir batu/sirtu 300,000.00Rp per m³9 Pasir beton 450,000.00Rp per m³
10 Pasir pasang 400,000.00Rp per m³11 Pasir urug 367,500.00Rp per m³12 Rooster 12 X 11 X 24 cm 7,260.00Rp per buah13 Semen 1,700.00Rp per kg14 Semen Warna 3,571.45Rp per kg15 Waterproofing coating Elastomeric Acrylic/ Terpasang 52,500.00Rp per m²16 Waterproofing Membran/terpasang 75,000.00Rp per m²17 Griil tutup gutter 268,000.00Rp per m²18 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³19 Paving Block 95,600.00Rp per m220 Kanstin 56,800.00Rp per m1
BAHAN KAYU1 KAYU KELAS II 3,732,000.00Rp PER M³2 KAYU KELAS III 5 x 7 x 400 2,346,000.00Rp PER M³3 KAYU KELAS III 5 x 7 x 400 6,250.00Rp PER M
BAHAN PEMBESIAN1 BESI BJTD-39 14,000.00Rp PER KG2 BESI BJTP-24 12,500.00Rp PER KG
PER KGLAIN-LAIN
1 AIR 250.00Rp PER LTR2 TANAH URUG 133,500.00Rp PER M³3 PAKU 21,500.00Rp PER KG4 MUR 2,500.00Rp PER BH5 KUNCI GEMBOK 60,500.00Rp PER SET6 ENGSEL 42,000.00Rp PER PSG7 KACA NAKO + RANGKA 143,000.00Rp PER UNIT8 BILLBOARD UK. 80 X 120 CM 544,500.00Rp PER UNIT9 MINYAK BEGISTING 24,500.00Rp PER LTR
10 MENI 31,000.00Rp PER KG11 KAWAT LAS 26,900.00Rp PER KG12 SOLAR 5,000.00Rp PER LTR
NO
DAFTAR HARGA BAHAN DAN UPAHPEKERJAAN PERENCANAAN PERKERASAN DAN DRAINASE JALAN
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan
URAIAN HARGA BAHANNO SATUAN13 MINYAK PELUMAS 35,000.00Rp PER LTR14 WATER PROOFING BITHUTANE SHEET 3000 /TERPASANG 237,600.00Rp PER M215 LOS KERJA DAN GUDANG 16,200,000.00Rp PER ls16 SIGNAGE ROOM 86,000.00Rp PER LS17 EXCAVATOR 381,250.00Rp PER JAM18 BACKHOE kap. Bucket 1 m3 350,000.00Rp PER JAM19 BULDOZER 350,000.00Rp PER JAM20 DUMPTRUCK 6 TON 250,000.00Rp PER JAM21 Wheel Loader 542,928.57Rp PER JAM22 Dump truck 269,028.57Rp PER JAM23 Motor Grader 542,928.57Rp PER JAM24 Vibrator Roller 416,428.57Rp PER JAM25 Water Tanker 262,428.57Rp PER JAM26 Pneumatic Tire Roller 280,028.57Rp PER JAM27 MOBILISASI ALAT BERAT 100,000,000.00Rp LS28 LAPIS PENIGIKAT 11,000.00Rp PER M229 ASPAL HOTMIX (AC) 126,500.00Rp PER M2
Harga Upah dan Bahan
GAPURA JALAN 632,906,245.11Rp
JUMLAH 632,906,245.11Rp
PPN 10% 63,290,624.51Rp
GRAND TOTAL 696,196,869.62Rp
DIBULATKAN 696,100,000.00Rp
NO URAIAN PEKERJAAN TOTAL
Terbilang : ENAM RATUS SEMBILAN PULUH ENAM JUTA SERATUS RIBU RUPIAH
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN GAPURA JALAN
TAHUN ANGGARAN 2013
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4.00 5 6=(4x5)
1 PERSIAPANa Pembersihan m2 270.00 19,000.00 5,130,000.00 b Galian m3 43.32 90,000.00 3,898,800.00
2 GAPURAa Pondasi m3 13.62 1,505,355.00 20,502,935.10 b Kolom IWF kg 5,936.00 27,965.00 166,000,240.00 c Pasangan Bata m2 27.72 275,684.00 7,641,960.48 d Pasangan Batu Alam m2 27.72 275,684.00 7,641,960.48 e Beton Kolom m3 29.16 1,505,355.00 43,896,151.80 f Balok IWF kg 5,872.00 27,965.00 164,210,480.00
Plat Dak Kanopi tiang m3 3.00 1,680,095.71 5,040,287.14 g Pengecatan m2 378.90 164,570.00 62,355,573.00 h Rangka dan Penutup Ornamen (GRC) m2 21.93 198,683.40 4,357,126.96
Besi Penahan Ornamen m1 24.00 125,000.00 3,000,000.00 i Pasangan Huruf Metal ls 1.00 25,000,000.00 25,000,000.00 j Rangka Kuda-kuda kayu m3 5.76 8,366,600.00 48,191,616.00
Rangka Penutup Atap m2 321.8202 66,300.00 21,336,679.26 k Penutup Atap Genting Keramik m2 321.82 138,905.00 44,702,434.88
TOTAL 632,906,245.11
2
RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN GAPURA JALAN
TAHUN ANGGARAN 2013
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
a c
1 1M2 MEMBERSIHKAN LAPANGAN 19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M 90,000.00 3 1M3 BETON READY MIX f'c = 25 Mpa 1,505,355.00 4 1M3 BETON K175 1,680,095.71 5 1 KG PEKERJAAN BAJA IWF 27,965.00 6 1M2 PEKERJAAN PENUTUP ATAP GENTING KERAMIK 138,905.00 7 1M2 PEKERJAAN PASANGAN BATA 1:3 275,684.00 8 1M2 PEKERJAAN PENGECATAN 164,570.00 9 1M3 RANGKA KUDA-KUDA KAYU EXPOSE 8,366,600.00
10 1M3 RANGKA ATAP GENTENG KERAMIK 66,300.00 11 1M2 RANGKA HOLLOW 117,208.40 12 1M2 PEMASANGAN GRC 81,475.00
HARGA SATUAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAANPEKERJAAN GAPURA JALAN
TAHUN ANGGARAN 2013
No. Jumlah Harga Rp
Jenis Pekerjaan
b
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M3 BETON READY MIX f'c = 25 Mpa
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00 TENAGA KERJA
1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,355.00 4 1 KG PEKERJAAN BAJA IWF
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi IWF ex DN SII kg 1.1500 10,700.00 12,305.00 TENAGA KERJA
1 Pekerja oh 0.0600 115,000.00 6,900.00 2 Tukang Besi Profil oh 0.0600 125,000.00 7,500.00 3 Kepala Tukang Besi Profil oh 0.0060 135,000.00 810.00 4 Mandor oh 0.0030 150,000.00 450.00
27,965.00 5 1M2 PEKERJAAN PENUTUP ATAP GENTING KERAMIK
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Genting Keramik lbr 1.1000 100,000.00 110,000.00 TENAGA KERJA
1 Pekerja oh 0.1500 115,000.00 17,250.00 2 Tukang Besi Profil oh 0.0750 125,000.00 9,375.00 3 Kepala Tukang Besi Profil oh 0.0080 135,000.00 1,080.00 4 Mandor oh 0.0080 150,000.00 1,200.00
138,905.00 6 1M2 PEKERJAAN PASANGAN BATA 1:3
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Bata Merah buah 72.0000 2,400.00 172,800.00 2 Semen kg 0.4200 1,700.00 714.00 3 Pasir Pasang m3 0.0540 400,000.00 21,600.00
TENAGA KERJA1 Pekerja oh 0.4290 115,000.00 49,335.00 2 Tukang oh 0.2140 125,000.00 26,750.00 3 Kepala Tukang oh 0.0210 135,000.00 2,835.00 4 Mandor oh 0.0110 150,000.00 1,650.00
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPEKERJAAN GAPURA JALAN
TAHUN ANGGARAN 2013
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
JUMLAH
JUMLAH
KEBUTUHAN
SNI
7393
:200
8
JUMLAH
KEBUTUHAN
KEBUTUHAN
JUMLAH
Analisa Harga Satuan Pekerjaan
275,684.00 7 1M2 PEKERJAAN PENGECATAN
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Cat Dasar kg 0.2000 70,000.00 14,000.00 2 Cat Penutup kg 0.3000 150,000.00 45,000.00 3 Alat Bantu ls 1.0000 25,000.00 25,000.00
TENAGA KERJA1 Pekerja oh 0.4290 115,000.00 49,335.00 2 Tukang oh 0.2140 125,000.00 26,750.00 3 Kepala Tukang oh 0.0210 135,000.00 2,835.00 4 Mandor oh 0.0110 150,000.00 1,650.00
164,570.00 8 1M2 PEMASANGAN GRC
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paku Skrup kg 0.1100 70,000.00 7,700.00 2 GRC lbr 0.3640 150,000.00 54,600.00
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Tukang oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0050 135,000.00 675.00 4 Mandor oh 0.0050 150,000.00 750.00
81,475.00 9 1M3 RANGKA KUDA-KUDA KAYU EXPOSE
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Balok Kayu m3 1.2000 2,000,000.00 2,400,000.00 2 Besi Strip kg 15.0000 150,000.00 2,250,000.00 3 Paku kg 5.6000 20,000.00 112,000.00
TENAGA KERJA1 Pekerja oh 6.7000 115,000.00 770,500.00 2 Tukang oh 20.1000 125,000.00 2,512,500.00 3 Kepala Tukang oh 2.0100 135,000.00 271,350.00 4 Mandor oh 0.3350 150,000.00 50,250.00
8,366,600.00 10 1M3 RANGKA ATAP GENTENG KERAMIK
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Kaso m3 0.0140 2,000,000.00 28,000.00 2 Reng m3 0.0036 2,000,000.00 7,200.00 3 Paku kg 0.2500 20,000.00 5,000.00
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Tukang oh 0.1000 125,000.00 12,500.00 3 Kepala Tukang oh 0.0100 135,000.00 1,350.00 4 Mandor oh 0.0050 150,000.00 750.00
66,300.00 10 1M2 RANGKA HOLLOW
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi Hollow m1 4.7600 18,090.00 86,108.40 2 Pengelasan m1 0.2000 25,000.00 5,000.00
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Tukang oh 0.1000 125,000.00 12,500.00 3 Kepala Tukang oh 0.0100 135,000.00 1,350.00 4 Mandor oh 0.0050 150,000.00 750.00
117,208.40 11 1M3 BETON K175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen PC kg 326.0000 1,700.00 554,200.00 2 Pasir Beton kg 760.0000 321.43 244,285.71 3 Split kg 1,029.000 607.14 624,750.00
TENAGA KERJA
KEBUTUHAN
JUMLAH
KEBUTUHAN
4:20
08
KEBUTUHAN
JUMLAH
KEBUTUHAN
JUMLAH
KEBUTUHAN
JUMLAH
KEBUTUHAN
JUMLAH
JUMLAH
Analisa Harga Satuan Pekerjaan
1 Pekerja oh 1.6500 125,000.00 206,250.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 150,000.00 4,200.00 4 Mandor oh 0.0830 145,000.00 12,035.00
1,680,095.71 SN
I 73
94JUMLAH
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Kepala Tukang 135,000.00Rp Per oh6 Mandor 150,000.00Rp Per oh7 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Batu belah 620,000.00Rp per m³2 Batu split 1/2 1,000,000.00Rp per m³3 Batu split 2/3 1,000,000.00Rp per m³4 Batu split 3/5 850,000.00Rp per m³5 Pasir batu/sirtu 300,000.00Rp per m³6 Pasir beton 450,000.00Rp per m³7 Pasir pasang 400,000.00Rp per m³8 Pasir urug 367,500.00Rp per m³9 Semen 1,700.00Rp per kg
10 Semen Warna 3,571.45Rp per kg11 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³12 Pasangan rangka atap 145,000.00Rp per m2
BAHAN PEMBESIAN1 BESI BJTD-39 14,000.00Rp PER KG2 BESI BJTP-24 12,500.00Rp PER KG3 BAJA IWF 10,700.00Rp PER KG4 PIPA GIP 2" 500,000.00Rp PER BTG5 BESI HOLLOW 4/4 72,360.00Rp PER BTG
LAIN-LAIN1 AIR 250.00Rp PER LTR2 TANAH URUG 133,500.00Rp PER M³3 PAKU 20,000.00Rp PER KG4 paku skrup 20,000.00Rp PER KG5 GRC 110,000.00Rp PER LBR6 Genteng Keramik 85,000.00Rp PER LBR7 MUR 2,500.00Rp PER BH8 Balok Kayu kelas 2 2,000,000.00Rp PER M39 KAWAT LAS 26,900.00Rp PER KG
10 SOLAR 5,000.00Rp PER LTR11 MINYAK PELUMAS 35,000.00Rp PER LTR11 LOS KERJA DAN GUDANG 16,200,000.00Rp PER ls12 EXCAVATOR 381,250.00Rp PER JAM13 BACKHOE kap. Bucket 1 m3 350,000.00Rp PER JAM14 BULDOZER 350,000.00Rp PER JAM15 DUMPTRUCK 6 TON 250,000.00Rp PER JAM16 Wheel Loader 542,928.57Rp PER JAM17 Dump truck 269,028.57Rp PER JAM18 Motor Grader 542,928.57Rp PER JAM19 Vibrator Roller 416,428.57Rp PER JAM20 Water Tanker 262,428.57Rp PER JAM21 Pneumatic Tire Roller 280,028.57Rp PER JAM
NO
DAFTAR HARGA BAHAN DAN UPAHPEKERJAAN GAPURA JALAN
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan
URAIAN HARGA BAHANNO SATUAN22 MOBILISASI ALAT BERAT 100,000,000.00Rp LS
Harga Upah dan Bahan
JALAN PEDESTRIAN L= 1.5 M, P = 2,830M 2,448,566,940.00Rp
JUMLAH 2,448,566,940.00Rp
PPN 10% 244,856,694.00Rp
GRAND TOTAL 2,693,423,634.00Rp
DIBULATKAN 2,693,400,000.00Rp
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PERENCANAAN JALAN PEDESTRIAN
TAHUN ANGGARAN 2013
NO URAIAN PEKERJAAN TOTAL
Terbilang :DUA MILYAR ENAM RATUS SEMBILAN PULUH TIGA JUTA EMPAT RATUS RIBU RUPIAH
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4 5 6=(4x5)
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan dan pembersihan jalan m2 8,490.00 19,000.00 161,310,000.00
I. 161,310,000.00 III. PEKERJAAN JALAN
1 Pekerjaan Pasir Urug t = 10 cm m3 849.00 477,000.00 404,973,000.00 2 Pekerjaan Guiding Blok m2 1,698.00 189,855.00 322,373,790.00 3 Pekerjaan trotoar jalan dengan Paving Block m2 5,094.00 119,505.00 608,758,470.00 4 Pekerjaan Kanstin m 11,320.00 84,024.00 951,151,680.00
II. 2,287,256,940.00 2,448,566,940.00
JALAN PEDESTRIAN L= 1.5 M, P = 2,830M
SUB JUMLAH TYPE JL.07
2
RENCANA ANGGARAN BIAYA (RAB)PEKERJAAN PERENCANAAN JALAN PEDESTRIAN
TAHUN ANGGARAN 2013
NO. URAIAN PEKERJAAN SATUAN VOLUME
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
a b c
1 1 M2 MEMBERSIHKAN LAPANGAN 19,000.00 2 1 M3 GALIAN TANAH SEDALAM 1 M 90,000.00 3 1 M2 PENGASPALAN DENGAN HOTMIX tebal 5 CM 253,157.31 4 1 M3 URUGAN PASIR 477,000.00 5 1 M3 PASANGAN BATU KALI 1,740,850.00 6 11 M3 BETON READY MIX 1,505,355.00 7 1 M2 COATING WATERPROOFING 167,320.00 8 1 KG PEKERJAAN PEMBESIAN DENGAN BESI ULIR U-39 16,879.50 9 1 M2 PEKERJAAN PASANGAN PAVING BLOK 119,505.00
10 1 M2 PASANGAN KANSTIN 84,024.00 11 1 M2 PEK PASANGAN GUIDING BLOK 189,855.00
HARGA SATUAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAANPEKERJAAN PERENCANAAN JALAN PEDESTRIAN
TAHUN ANGGARAN 2013
No. Jenis Pekerjaan Jumlah Harga Rp
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M2 PENGASPALAN DENGAN HOTMIX, tebal = 5 cm
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Asphal M2 1.2000 126,500.00 151,800.00 2 filter kg 0.0057 400,000.00 2,280.00 3 Agregat halus / Pasir Beton m3 0.0299 450,000.00 13,455.00 4 Kayu Bakar m3 0.0300 2,346,000.00 70,380.00 5 Alat Bantu ls 0.1069 23,791.50 2,543.31
TENAGA KERJA1 Pekerja oh 0.0876 115,000.00 10,074.00 2 Mandor oh 0.0175 150,000.00 2,625.00
SEWA ALAT1 Tandem Roller jam 0.0118
253,157.31
4 1M3 URUGAN PASIRNO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Pasir Urug m3 1.2000 367,500.00 441,000.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Mandor oh 0.0100 150,000.00 1,500.00 3 Tukang Gali oh -4 Kepala Tukang oh -
477,000.00
5 1M3 PASANGAN BATU KALINO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Batu Belah 15/20 m3 1.1000 620,000.00 682,000.00 2 Semen Portland zak 7.8400 85,000.00 666,400.00 3 Pasir Pasang m3 0.3140 400,000.00 125,600.00
TENAGA KERJA1 Pekerja oh 1.5000 115,000.00 172,500.00 2 Tukang Batu oh 0.6000 125,000.00 75,000.00 3 Kepala Tukang oh 0.0600 135,000.00 8,100.00 4 Mandor oh 0.0750 150,000.00 11,250.00
1,740,850.00 6 1M3 BETON READY MIX f'c = 25 Mpa
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00
JUMLAH
JUMLAH
KEBUTUHAN
KEBUTUHAN
(SNI 28535:2008)
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPEKERJAAN PERENCANAAN JALAN PEDESTRIAN
TAHUN ANGGARAN 2013
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
(SNI 28535:2008)
TENAGA KERJA1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,355.00 7 1M2 COATING WATERPROOFING
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Waterproofing m3 1.6000 85,000.00 136,000.00 TENAGA KERJA
1 Pekerja oh 0.1200 115,000.00 13,800.00 2 Tukang Batu oh 0.1200 125,000.00 15,000.00 3 Kepala Tukang oh 0.0120 135,000.00 1,620.00 4 Mandor oh 0.0060 150,000.00 900.00
167,320.00 8 1KG PEKERJAAN PEMBESIAN DENGAN BESI BETON ULIR U-39
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi Beton Ulir U-39 kg 1.0500 14,000.00 14,700.00 2 Kawat Beton kg 0.0150 24,000.00 360.00
TENAGA KERJA1 Pekerja oh 0.0070 115,000.00 805.00 2 TukangBesi oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
16,879.50 9 1m2 PEKERJAAN PEMASANGAN PAVING STONE ( Blok ) Tbl. 8 CM ABU-ABU
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paving Stone Abu-abu persegi panjang tbl.8cm m2 1.0500 95,600.00 100,380.00 TENAGA KERJA
1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0250 150,000.00 3,750.00
119,505.00 10 1m PEKERJAAN PEMASANGAN KANSTIN TRAP UK. 15.25.40 cm K-175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen Portland kg 0.0454 85,000.00 3,859.00 2 Pasir Pasang kg 0.0054 400,000.00 2,160.00 3 Kanstin Trap uk. 15.25.40 cm kg 1.1000 56,800.00 62,480.00
TENAGA KERJA1 Pekerja oh 0.0500 115,000.00 5,750.00 2 Tukang Batu oh 0.0500 125,000.00 6,250.00 3 Kepala Tukang oh 0.0250 135,000.00 3,375.00 4 Mandor oh 0.0010 150,000.00 150.00
84,024.00 11 1M2 PEKERJAAN GUIDING BLOCK
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Guiding Block m2 1.0500 100,000.00 105,000.00 2 Semen kg 10.0000 1,700.00 17,000.00 3 Pasir Pasang m3 0.0450 400,000.00 18,000.00
TENAGA KERJA1 Pekerja oh 0.2600 115,000.00 29,900.00 2 Tukang Batu oh 0.1300 125,000.00 16,250.00 3 Kepala Tukang oh 0.0130 135,000.00 1,755.00 4 Mandor oh 0.0130 150,000.00 1,950.00
189,855.00
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Kepala Tukang 135,000.00Rp Per oh6 Mandor 150,000.00Rp Per oh7 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Bata merah 750.00Rp per buah2 Batako 4,200.00Rp per buah3 Batu belah 620,000.00Rp per m³4 Batu split 1/2 1,000,000.00Rp per m³5 Batu split 2/3 1,000,000.00Rp per m³6 Batu split 3/5 850,000.00Rp per m³7 Glass block 20 x 20 cm 17,000.00Rp per kg8 Pasir batu/sirtu 300,000.00Rp per m³9 Pasir beton 450,000.00Rp per m³
10 Pasir pasang 400,000.00Rp per m³11 Pasir urug 367,500.00Rp per m³12 Rooster 12 X 11 X 24 cm 7,260.00Rp per buah13 Semen 1,700.00Rp per kg14 Semen Warna 3,571.45Rp per kg15 Waterproofing coating Elastomeric Acrylic/ Terpasang 52,500.00Rp per m²16 Waterproofing Membran/terpasang 75,000.00Rp per m²17 Griil tutup gutter 268,000.00Rp per m²18 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³19 Paving Block 95,600.00Rp per m220 Kanstin 56,800.00Rp per m1
BAHAN KAYU1 KAYU KELAS II 3,732,000.00Rp PER M³2 KAYU KELAS III 5 x 7 x 400 2,346,000.00Rp PER M³3 KAYU KELAS III 5 x 7 x 400 6,250.00Rp PER M
BAHAN PEMBESIAN1 BESI BJTD-39 14,000.00Rp PER KG2 BESI BJTP-24 12,500.00Rp PER KG
PER KGLAIN-LAIN
1 AIR 250.00Rp PER LTR2 TANAH URUG 133,500.00Rp PER M³3 PAKU 21,500.00Rp PER KG4 MUR 2,500.00Rp PER BH5 KUNCI GEMBOK 60,500.00Rp PER SET6 ENGSEL 42,000.00Rp PER PSG7 KACA NAKO + RANGKA 143,000.00Rp PER UNIT8 BILLBOARD UK. 80 X 120 CM 544,500.00Rp PER UNIT9 MINYAK BEGISTING 24,500.00Rp PER LTR
10 MENI 31,000.00Rp PER KG11 KAWAT LAS 26,900.00Rp PER KG12 SOLAR 5,000.00Rp PER LTR
NO
DAFTAR HARGA BAHAN DAN UPAHPEKERJAAN PERENCANAAN JALAN PEDESTRIAN
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan
URAIAN HARGA BAHANNO SATUAN13 MINYAK PELUMAS 35,000.00Rp PER LTR14 WATER PROOFING BITHUTANE SHEET 3000 /TERPASANG 237,600.00Rp PER M215 LOS KERJA DAN GUDANG 16,200,000.00Rp PER ls16 SIGNAGE ROOM 86,000.00Rp PER LS17 EXCAVATOR 381,250.00Rp PER JAM18 BACKHOE kap. Bucket 1 m3 350,000.00Rp PER JAM19 BULDOZER 350,000.00Rp PER JAM20 DUMPTRUCK 6 TON 250,000.00Rp PER JAM21 Wheel Loader 542,928.57Rp PER JAM22 Dump truck 269,028.57Rp PER JAM23 Motor Grader 542,928.57Rp PER JAM24 Vibrator Roller 416,428.57Rp PER JAM25 Water Tanker 262,428.57Rp PER JAM26 Pneumatic Tire Roller 280,028.57Rp PER JAM27 MOBILISASI ALAT BERAT 100,000,000.00Rp LS28 LAPIS PENIGIKAT 11,000.00Rp PER M229 ASPAL HOTMIX (AC) 126,500.00Rp PER M2
Harga Upah dan Bahan
Pekerjaan Persiapan 102,372,000.00Rp
Pek. Galian Tanah RTH 121,230,000.00Rp
Pek. Pasir Urug t = 10 cm Bawah RTH 257,007,600.00Rp
Pek. Pas. Paving Block 100,719,446.84Rp
Pek Pas Guiding Blok 29,898,745.11Rp
Pek. Pas. Rumput Jepang 74,361,691.50Rp
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PENYUSUNAN TATA BANGUNAN DAN LINGKUNGAN RTH
TAHUN ANGGARAN 2013
NO URAIAN PEKERJAAN TOTAL
Pek. Pas. Rumput Gajah 65,006,344.50Rp
Pek. Pas. Lampu Taman Double 36,000,000.00Rp
Pek. Pas. Bangku Taman 254,888,714.88Rp
Pek. Pas. Pohon Peneduh 1,784,480.00Rp
Pek. Pas. Tempat Sampah 1,305,000.00Rp
Pek Plaza 2,181,005,940.32Rp
Pek Pas Tifa Kecil 174,766,106.29Rp
Pek Sumur Resapan dan Saluran 222,786,973.96Rp
Pek. Pos Jaga 211,009,056.80Rp
JUMLAH 3,834,142,100.20Rp
PPN 10% 383,414,210.02Rp
GRAND TOTAL 4,217,556,310.22Rp
DIBULATKAN 4,217,500,000.00Rp
Terbilang : EMPAT MILYAR DUA RATUS TUJUH BELAS JUTA LIMA RATUS RIBU RUPIAH
Rekapitulasi RAB Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3 4 5 6=(4x5)
I. PEKERJAAN PERSIAPAN1 Pekerjaan Persiapan dan pembersihan laha m2 5,388.00 19,000.00 102,372,000.00
I. 102,372,000.00 II. PEKERJAAN RUANG TERBUKA HIJAU
1 Pek. Galian Tanah RTH m3 1,347.00 90,000.00 121,230,000.00 2 Pek. Pasir Urug t = 10 cm Bawah RTH m3 538.80 477,000.00 257,007,600.00 3 Pek. Pas. Paving Block m2 985.52 102,199.50 100,719,446.84 4 Pek. Pas. Rumput Jepang m2 1,697.00 43,819.50 74,361,691.50 5 Pek. Pas. Rumput Gajah m2 1,951.00 33,319.50 65,006,344.50 7 Pek. Pas. Lampu Taman Double buah 16.00 2,250,000.00 36,000,000.00 8 Pek. Pas. Bangku Taman buah 38.00 6,707,597.76 254,888,714.88 9 Pek. Pas. Pohon Peneduh titik 19.00 93,920.00 1,784,480.00 10 Pek. Pas. Tempat Sampah buah 9.00 145,000.00 1,305,000.00 11 Pek Pas. Guiding Block m2 157.482 189,855.00 29,898,745.11
942,202,022.83 III. PEKERJAAN SCULPTURE TIFA
1 Baja Iwf kg 1,075.80 27,965.00 30,084,747.00 2 Beton K 175 m3 2.61 1,663,590.71 4,341,971.76 3 Rangka Besi m2 229.00 6,250.00 1,431,250.00 4 Finishing Alumunium Composite m2 108.20 207,000.00 22,397,400.00
58,255,368.76 TOTAL 3 SCULPTURE 174,766,106.29
IV. PEKERJAAN PLAZA1 Pek Pondasi Batu Kali m3 1,344.00 1,569,025.00 2,108,769,600.00 2 Pek Pasir Urug m3 9.60 477,000.00 4,579,200.00 3 Pek Tanah Urug m2 129.96 200,000.00 25,992,000.00 4 Pek Pas Batu Bata m2 129.00 275,684.00 35,563,236.00 5 Pek Plesteran m2 14.40 76,737.80 1,105,024.32 6 Pek Pas Besi Siku m1 84.00 41,666.67 3,500,000.00 7 Pek Pas Ram Kawat m2 36.00 41,580.00 1,496,880.00
2,181,005,940.32
V. PEKERJAAN SUMUR RESAPAN DAN SALURANPek Pas Batu Bata m2 88.80 275,684.00 24,480,739.20 Pas Kerikil Kali m3 4.74 450,000.00 2,133,000.00 Pas Ijuk m3 9.48 10,000.00 94,800.00 Pipa PVC m1 143.05 18,750.00 2,682,187.50 Beton K 175 m3 1.58 1,663,590.71 2,635,127.69
32,025,854.39
Pek Pas Batu Bata m2 508.61 275,684.00 140,215,087.87 Pek Plesteran 1 : 5 m2 508.61 76,737.80 39,029,458.98 Beton K 175 m3 6.92 1,663,590.71 11,516,572.71
190,761,119.56
222,786,973.96
VI. PEKERJAAN POS JAGAA PEKERJAAN DINDING
A.1 Pek. Dinding bata merah Spesi 1 : 5, M2 187.92 176,700.00 33,205,464.00 A.2 Pek. Dinding bata merah Spesi 1 : 3, M2 45.45 275,684.00 12,529,837.80 A.3 Pek. Plesteran dinding bata merah Spesi 1 : 5, M2 187.92 45,600.00 8,569,152.00 A.4 Pek. Plesteran dinding bata merah Spesi 1 : 3, M2 90.90 88,800.00 8,071,920.00 A.5 M2 64.00 49,200.00 3,148,800.00 A.6 M2 90.90 85,900.00 7,808,310.00 A.7 M2 12.50 122,100.00 1,526,250.00
JUMLAH A 74,859,733.80 B PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
B.1 Pek. Kusen pintu (P1) rangka kayu M1 5.23 6,033,600.00 31,555,728.00 B.2 M2 1.61 12,900.00 20,769.00 B.3 M1 4.40 6,033,600.00 26,547,840.00 B.4 M1 4.20 6,033,600.00 25,341,120.00 B.5 M1 5.80 6,033,600.00 34,994,880.00 B.6 Pek. Daun pintu P1 M2 1.48 731,300.00 1,082,324.00 B.7 Pas. Engsel pintu 4" Bh 2.00 47,000.00 94,000.00 B.8 Pas. Lever Handle Plate Bh 1.00 42,300.00 42,300.00 B.9 Pas. Swing Lockase Bh 1.00 42,300.00 42,300.00 B.10 Pas. Kaca 5 mm M2 2.23 109,000.00 243,070.00
JUMLAH B 119,964,331.00 C PEKERJAAN LANTAI
C.1 Pek. Urugan pasir dibawah Lantai, t = 10 cm M3 3.04 242,200.00 736,288.00 C.2 Pek. Lantai kerja t=3 cm, bawah lantai M3 0.91 261,600.00 238,056.00 C.3 Pek. Lantai Keramik 30 x 30 cm putih, Sek. Roman M2 21.00 122,100.00 2,564,100.00 C.4 Pek. Lantai Keramik 20 x 20 cm putih, Sek. Roman M2 9.44 125,100.00 1,180,944.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
2
RENCANA ANGGARAN BIAYA (RAB)PENYUSUNAN TATA BANGUNAN DAN LINGKUNGAN RTH
TAHUN ANGGARAN 2013
III SUB JUMLAH TOTAL SCULPTURE
IV SUB JUMLAH TOTAL PLAZA
V SUB JUMLAH TOTAL SUMUR & SALURAN
Ruang Terbuka Hijau
Pek, Plesteran beton dan aci , spesi 1 :3Pek. Dinding keramik 20x25 cm Sek. RomanPek. Dinding keramik 10x20 cm, sek. Roman
Pek. Kusen pintu (P2), PVCPek. Kusen Jendela (J1), rangka kayuPek. Kusen Jendela (J2), rangka kayuPek. Kusen Jendela (BV1), rangka kayu
II SUB JUMLAH TOTAL POS JAGA
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
C.5 Pek. Lantai Keramik 20 x 20 cm putih, Sek. Roman M1 2.00 122,100.00 244,200.00 JUMLAH C 4,963,588.00
D PEKERJAAN PLAFONDD.1 Pas. Rangka plafond Besi Hollow 4x4 M2 30.01 39,200.00 1,176,392.00 D.2 Pas. Penutup palfond Gypsum Board t =9mm M2 20.58 81,200.00 1,671,096.00 D.3 Pas. Penutup palfond GRC Board t =4mm M2 9.44 96,000.00 906,240.00 D.4 Pas. List givsum 7 cm M1 31.34 35,200.00 1,103,168.00
JUMLAH D 4,856,896.00 E PEKERJAAN PENGECATAN
E.1 Pengecatan dinding Sek. "VINILEX" M2 278.82 19,100.00 5,325,462.00 E.2 Pengecatan Plafond Sek. "VINILEX" M2 30.02 19,100.00 573,382.00 E.3 Pengecatan kayu,sek. "AVIAN" M2 10.88 42,800.00 465,664.00
JUMLAH E 6,364,508.00
211,009,056.80 VI SUB JUMLAH TOTAL POS JAGA
Rencana Anggaran Biaya Pekerjaan Perencanaan Perkerasan Jalan dan Drainase
1 1M2 MEMBERSIHKAN LAPANGANNO SATUAN INDEKS HARGA SATUAN JUMLAH
TENAGA KERJA1 Pekerja oh 0.1000 115,000.00 11,500.00 2 Mandor oh 0.0500 150,000.00 7,500.00
19,000.00 2 1M3 GALIAN TANAH SEDALAM 1 M
NO SATUAN INDEKS HARGA SATUAN JUMLAHTENAGA KERJA
1 Pekerja oh 0.7500 115,000.00 86,250.00 2 Mandor oh 0.0250 150,000.00 3,750.00
90,000.00 3 1M3 URUGAN PASIR
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Pasir Urug m3 1.2000 367,500.00 441,000.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Mandor oh 0.0100 150,000.00 1,500.00 3 Tukang Gali oh -4 Kepala Tukang oh -
477,000.00 4 1M2 PEKERJAAN PEMASANGAN RUMPUT GAJAH
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 RUMPUT GAJAH m2 1.0500 30,000.00 31,500.00 TENAGA KERJA
1 Pekerja oh 0.0070 115,000.00 805.00 2 Tukang Rumput oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
33,319.50 5 1M2 PEKERJAAN PEMASANGAN RUMPUT JEPANG
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 RUMPUT JEPANG m2 1.0500 40,000.00 42,000.00 TENAGA KERJA
1 Pekerja oh 0.0070 115,000.00 805.00 2 Tukang Rumput oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
43,819.50 6 1TTK PEKERJAAN PENANAMAN TANAMAN PENEDUH
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Waterproofing Membran/terpasang bh 1.0000 75,000.00 75,000.00 TENAGA KERJA
1 Pekerja oh 0.0730 115,000.00 8,395.00 2 Tukang Rumput oh 0.0730 125,000.00 9,125.00 3 Kepala Tukang oh 0.0070 125,000.00 875.00 4 Mandor oh 0.0035 150,000.00 525.00
ANALISA HARGA SATUAN SNI 2008 DAN PENDEKATAN LAPANGANPENYUSUNAN RENCANA TATA BANGUNAN DAN LINGKUNGAN ( RTH )
TAHUN ANGGARAN 2013
JUMLAH
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
KEBUTUHAN
NO
KEBUTUHAN
JUMLAH
KEBUTUHAN
JUMLAH
KEBUTUHAN
Analisa Harga Satuan Pekerjaan
93,920.00 7 1M2 PEKERJAAN PAVING BLOCK
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Paving Block m2 1.0500 95,600.00 100,380.00 TENAGA KERJA
1 Pekerja oh 0.0070 115,000.00 805.00 2 Tukang Batu oh 0.0070 125,000.00 875.00 3 Kepala Tukang oh 0.0007 135,000.00 94.50 4 Mandor oh 0.0003 150,000.00 45.00
102,199.50 8 1M2 PEKERJAAN GUIDING BLOCK
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Guiding Block m2 1.0500 100,000.00 105,000.00 2 Semen kg 10.0000 1,700.00 17,000.00 3 Pasir Pasang m3 0.0450 400,000.00 18,000.00
TENAGA KERJA1 Pekerja oh 0.2600 115,000.00 29,900.00 2 Tukang Batu oh 0.1300 125,000.00 16,250.00 3 Kepala Tukang oh 0.0130 135,000.00 1,755.00 4 Mandor oh 0.0130 150,000.00 1,950.00
189,855.00 8 1M3 BETON READY MIX f'c = 25 Mpa
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Ready Mix f'c = 25 Mpa m3 1.1000 1,150,000.00 1,265,000.00 TENAGA KERJA
1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 125,000.00 3,500.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,505,075.00 9 1BH KURSI TAMAN
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Beton K175 m3 4.0320 1,663,590.71 6,707,597.76
6,707,597.76 10 1M3 BETON K175
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen PC kg 326.0000 1,700.00 554,200.00 2 Pasir Beton kg 760.0000 321.43 244,285.71 3 Split kg 1,029.0000 607.14 624,750.00
TENAGA KERJA1 Pekerja oh 1.6500 115,000.00 189,750.00 2 Tukang Batu oh 0.2750 125,000.00 34,375.00 3 Kepala Tukang oh 0.0280 135,000.00 3,780.00 4 Mandor oh 0.0830 150,000.00 12,450.00
1,663,590.71 11 1M2 PEKERJAAN PASANGAN BATA 1:3
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Bata Merah buah 72.0000 2,400.00 172,800.00 2 Semen kg 0.4200 1,700.00 714.00 3 Pasir Pasang m3 0.0540 400,000.00 21,600.00
TENAGA KERJA1 Pekerja oh 0.4290 115,000.00 49,335.00 2 Tukang oh 0.2140 125,000.00 26,750.00 3 Kepala Tukang oh 0.0210 135,000.00 2,835.00 4 Mandor oh 0.0110 150,000.00 1,650.00
275,684.00
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
KEBUTUHAN
JUMLAH
KEBUTUHANSN
I 73
94:2
008
JUMLAH
JUMLAH
KEBUTUHAN
SNI
7394
:200
8
JUMLAH
Analisa Harga Satuan Pekerjaan
12 1M2 PEKERJAAN PENGECATANNO SATUAN INDEKS HARGA SATUAN JUMLAH
BAHAN1 Cat Dasar kg 0.2000 70,000.00 14,000.00 2 Cat Penutup kg 0.3000 150,000.00 45,000.00 3 Alat Bantu ls 1.0000 25,000.00 25,000.00
TENAGA KERJA1 Pekerja oh 0.4290 115,000.00 49,335.00 2 Tukang oh 0.2140 125,000.00 26,750.00 3 Kepala Tukang oh 0.0210 135,000.00 2,835.00 4 Mandor oh 0.0110 150,000.00 1,650.00
164,570.00 13 1 KG PEKERJAAN BAJA IWF
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Besi IWF ex DN SII kg 1.1500 10,700.00 12,305.00 TENAGA KERJA
1 Pekerja oh 0.0600 115,000.00 6,900.00 2 Tukang Besi Profil oh 0.0600 125,000.00 7,500.00 3 Kepala Tukang Besi Profil oh 0.0060 135,000.00 810.00 4 Mandor oh 0.0030 150,000.00 450.00
27,965.00 14 1M2 PEKERJAAN PLESTERAN 1 : 5
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Semen kg 5.1840 1,700.00 8,812.80 2 Pasir Pasang m3 0.0260 400,000.00 10,400.00
TENAGA KERJA1 Pekerja oh 0.3000 115,000.00 34,500.00 2 Tukang oh 0.1500 125,000.00 18,750.00 3 Kepala Tukang oh 0.0150 135,000.00 2,025.00 4 Mandor oh 0.0150 150,000.00 2,250.00
76,737.80 15 1M2 PEKERJAAN PONDASI BATU BELAH 1 : 3
NO SATUAN INDEKS HARGA SATUAN JUMLAHBAHAN
1 Batu Belah m3 1.2000 620,000.00 744,000.00 2 Semen kg 202.0000 1,700.00 343,400.00 3 Pasir Pasang m3 0.4850 400,000.00 194,000.00
TENAGA KERJA1 Pekerja oh 1.5000 115,000.00 172,500.00 2 Tukang oh 0.7500 125,000.00 93,750.00 3 Kepala Tukang oh 0.0750 135,000.00 10,125.00 4 Mandor oh 0.0750 150,000.00 11,250.00
1,569,025.00
KEBUTUHAN
SNI
7393
:200
8
JUMLAH
KEBUTUHAN
SNI
7393
:200
8
JUMLAH
KEBUTUHAN
SNI
7393
:200
8
JUMLAH
KEBUTUHAN
JUMLAH
Analisa Harga Satuan Pekerjaan
URAIAN HARGA BAHANTENAGA KERJA
1 Pekerja 115,000.00Rp Per oh2 Tukang Batu 125,000.00Rp Per oh3 Tukang Kayu 125,000.00Rp Per oh4 Tukang Besi 125,000.00Rp Per oh5 Tukang Rumput 125,000.00Rp Per oh6 Tukang Listrik 125,000.00Rp Per oh7 Kepala Tukang 135,000.00Rp Per oh8 Mandor 150,000.00Rp Per oh9 Operator alat berat 145,000.00Rp Per oh
BAHAN PASANGAN1 Bata merah 750.00Rp per buah2 Batako 4,200.00Rp per buah3 Kerikil Kali 450,000.00Rp per m³4 Batu belah 620,000.00Rp per m³5 Batu split 1/2 1,000,000.00Rp per m³6 Batu split 2/3 1,000,000.00Rp per m³7 Batu split 3/5 850,000.00Rp per m³8 Glass block 20 x 20 cm 17,000.00Rp per kg9 Pasir batu/sirtu 300,000.00Rp per m³
10 Pasir beton 450,000.00Rp per m³11 Pasir pasang 400,000.00Rp per m³12 Pasir urug 367,500.00Rp per m³13 Tanah Urug 200,000.00Rp per m³14 Rooster 12 X 11 X 24 cm 7,260.00Rp per buah15 Semen 1,700.00Rp per kg16 Semen Warna 3,571.45Rp per kg17 Waterproofing coating Elastomeric Acrylic/ Terpasang 52,500.00Rp per m²18 Waterproofing Membran/terpasang 75,000.00Rp per m²19 Griil tutup gutter 268,000.00Rp per m²20 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp per m³21 Besi Baja IWF 10,700.00Rp per kg22 Besi Ø 10 75,000.00Rp per btg23 Besi Siku 50/50 250,000.00Rp per btg24 Ram Kawat 41,580.00Rp per m225 Alumunium Composite Panel 4 mm 207,000.00Rp per m226 Paving Block 95,600.00Rp per m227 Kanstin 56,800.00Rp per m128 Pipa PVC 2" 18,750.00Rp per m129 Pasangan rangka atap 145,000.00Rp per m2
RUMPUT1 RUMPUT GAJAH 30,000.00Rp PER m²2 RUMPUT JEPANG 40,000.00Rp PER m²
BAHAN PERKERASAN1 Beton Ready Mix f'c = 25 MPa 1,150,000.00Rp PER m³2 Batu split 3/5 850,000.00Rp PER m³3 Pasir beton 450,000.00Rp PER m³4 Pasir pasang 400,000.00Rp PER m³5 Pasir urug 367,500.00Rp PER m³6 Semen PC 1,700.00Rp PER kg
NO
DAFTAR HARGA BAHAN DAN UPAHPENYUSUNAN RENCANA TATA BANGUNAN DAN LINGKUNGAN ( RTH )
TAHUN ANGGARAN 2013
SATUAN
Harga Upah dan Bahan