rabRENCANA ANGGARAN BIAYA

HARGA JUMLAHNO.URAIAN PEKERJAANVOLUMESTNANALISASATUANHARGA(Rp.)(Rp.)1234567IPEKERJAAN PERSIAPAN1Pembersihan Lapangan/Pembongkaran Bangunan Lama 1.000LsTaksir5,000,000.005,000,000.002Pengukuran dan Pemasangan Bowplank 1.000LsTaksir800,000.00800,000.003Direksikeet/Pondok Kerja (Sewa) 1.000LsTaksir2,500,000.002,500,000.004Papan Nama Proyek1.000LsTaksir550,000.00550,000.00Sub Jumlah8,850,000.00IIPEKERJAAN STRUKTUR BAWAH APEKERJAAN TANAH DAN PONDASI1Pondasi Tapak Type K1 = 13 Unit- Galian Tanah Pondasi 58.800m3SNI-2835-2008-6.247,700.002,804,760.00- Urugan Kembali Bekas Galian 14.700m3SNI-2835-2008-6.912,998.00191,070.60- Urugan Pasir Alas Pondasi t = 5 cm 0.980m3SNI-2835-2008-6.11129,600.00127,008.00- Pasangan Batu Kosong t = 10 cm 1.960m3SNI-2836-2008-6.9268,605.00526,465.80- Beton Bertulang Cincin Sumuran T = 8 cm 11.394m3SNI-7394-2008-a3,600,981.0041,031,133.14- Beton Cyclopen Pengisi Sumuran 12.736m3SNI-2836-2008-6.10431,506.005,495,591.38- Plat Pondasi Tapak Ukuran 120 x 120 cm 4.320m3SNI-7394-2008-b3,193,751.0013,797,004.32- Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof 1.740m3SNI-7394-2008-c4,983,766.008,671,752.842Pondasi Tapak Type P2 = 8 Unit- Galian Tanah Pondasi 47.040m3SNI-2835-2008-6.247,700.002,243,808.00- Urugan Kembali Bekas Galian 11.760m3SNI-2835-2008-6.912,998.00152,856.48- Urugan Pasir Alas Pondasi t = 5 cm 0.784m3SNI-2835-2008-6.11129,600.00101,606.40- Pasangan Batu Kosong t = 10 cm 1.568m3SNI-2836-2008-6.9268,605.00421,172.64- Beton Bertulang Cincin Sumuran T = 8 cm 1.266m3SNI-7394-2008-a3,600,981.004,559,014.79- Beton Cyclopen Pengisi Sumuran 10.189m3SNI-2836-2008-6.10431,506.004,396,473.10- Plat Pondasi Tapak Ukuran 120 x 120 cm 3.456m3SNI-7394-2008-b3,193,751.0011,037,603.46- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof 1.044m3SNI-7394-2008-d5,475,610.005,716,536.843Pondasi Tapak Type PT3 = 11 Unit- Galian Tanah Pondasi 32.340m3SNI-2835-2008-6.247,700.001,542,618.00- Urugan Kembali Bekas Galian 8.085m3SNI-2835-2008-6.912,998.00105,088.83- Urugan Pasir Alas Pondasi t = 5 cm 1.078m3SNI-2835-2008-6.11129,600.00139,708.80- Pasangan Batu Kosong t = 10 cm 2.156m3SNI-2836-2008-6.9268,605.00579,112.38- Plat Pondasi Tapak Ukuran 120 x 120 cm 4.752m3SNI-7394-2008-b3,193,751.0015,176,704.75- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof 2.393m3SNI-7394-2008-c4,983,766.0011,923,660.164Pondasi Menerus (sloof 25/40 cm)- Galian Tanah Pondasi Menerus26.208m3SNI-2835-2008-6.139,000.001,022,112.00- Urugan Kembali Bekas Galian 6.552m3SNI-2835-2008-6.9RpERROR:#VALUE!- Urugan Pasir Alas Pondasi T = 5 cm 2.417m3SNI-2835-2008-6.11129,600.00313,178.40- Pasangan Batu Kosong Pondasi T =10 cm 4.833m3SNI-2836-2008-6.9268,605.001,298,167.97- Pasangan Batu Gunung 1 : 4 17.721m3SNI-2836-2008-6.3552,665.009,793,776.475Sloof Gantung (Sloof 25/40 cm) - Galian Tanah Pondasi Menerus0.540m3SNI-2835-2008-6.139,000.0021,060.00- Urugan Kembali Bekas Galian 0.135m3SNI-2835-2008-6.9RpERROR:#VALUE!- Urugan Pasir Alas Pondasi T = 5 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.00- Pasangan Batu Kosong Pondasi T =10 cm 0.360m3SNI-2836-2008-6.9268,605.0096,697.80Sub JumlahERROR:#VALUE!IIIPEKERJAAN LANTAI IAPEKERJAAN SELASAR DAN TRAP TANGGAPekerjaan Selasar Depan 1Galian Tanah Pondasi Menerus5.544m3SNI-2835-2008-6.139,000.00216,216.002Urugan Kembali Bekas Galian 1.386m3SNI-2835-2008-6.9RpERROR:#VALUE!3Urugan Pasir Alas Pondasi T = 5 cm 0.846m3SNI-2835-2008-6.11129,600.00109,641.604Pasangan Batu Kosong Pondasi T =10 cm 1.692m3SNI-2836-2008-6.9268,605.00454,479.665Pasangan Batu Gunung 1 : 4 6.204m3SNI-2836-2008-6.3552,665.003,428,733.666Pasangan Trasram Bata 1 : 2 8.460m2SNI-6897-2008-6.795,026.00803,919.967Plesteran 1 : 214.060m2SNI-2837-2008-6.242,234.00593,810.04Pekerjaan Trap Tangga Pada Selasar 2 Unit1Galian Tanah 0.840m3SNI-2835-2008-6.139,000.0032,760.002Urugan Kembali Bekas Galian 0.210m3SNI-2835-2008-6.9RpERROR:#VALUE!3Urugan Pasir Alas Pondasi t = 5 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.004Pasangan Batu Kosong Pondasi T =10 cm 0.360m3SNI-2836-2008-6.9268,605.0096,697.805Pasangan Trasram Bata 1 : 24.000m2SNI-6897-2008-6.795,026.00380,104.006Plesteran Bata 1 : 24.000m2SNI-2837-2008-6.242,234.00168,936.00Sub JumlahERROR:#VALUE!BPEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Trasram Bata 1 : 2 dibawah Lantai 29.535m2SNI-6897-2008-6.795,026.002,806,592.912Plesteran Trasram Bata 1 : 2 dibawah Lantai 59.070m2SNI-2837-2008-6.242,234.002,494,762.383Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm 10.200m2SNI-6897-2008-6.795,026.00969,265.204Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm 20.400m2SNI-2837-2008-6.242,234.00861,573.605Pasangan Dinding Bata 1 : 4121.864m2SNI-6897-2008-6.986,696.0010,565,086.676Plesteran Dinding Bata 1 : 4257.507m2SNI-2837-2008-6.437,941.009,770,080.687Pasangan Dinding Bata 1 : 4 (diatas balok 15/18)7.252m2SNI-6897-2008-6.986,696.00628,719.398Plesteran Dinding Bata 1 : 4 (diatas balok 15/18)14.504m2SNI-2837-2008-6.437,941.00550,296.269Plesteran 1 : 3 (Kolom dan Balok)143.530m2SNI-2837-2008-6.339,662.005,692,686.86Sub Jumlah34,339,063.95CPEKERJAAN BETON BERTULANG 1Sloof Beton 25/40 cm (Pondasi Menerus) p = 57 m5.700m3SNI-7394-2008-e3,862,619.0022,016,928.302Sloof Beton 25/40 cm (Sloof Gantung) P = 20 m2.000m3SNI-7394-2008-e3,862,619.007,725,238.003Sloof Beton 25/40 cm (Selasar Depan) P = 20 m2.000m3SNI-7394-2008-e3,862,619.007,725,238.004Kolom Beton 30/40 cm = 10 Kolom 5.340m3SNI-7394-2008-g4,983,766.0026,613,310.445Kolom Beton 30/30 cm = 8 Kolom 3.204m3SNI-7394-2008-h5,475,610.0017,543,854.446Balok Lantai 25/40 cm P = 99 m9.100m30.00RpERROR:#VALUE!7Balok Lantai 30/60 cm p = 14 m2.520m3SNI-7394-2008-l4,497,955.0011,334,846.608Plat Lantai T = 12 cm 13.890m3SNI-7394-2008-m4,247,801.0059,001,955.899Balok Diatas Kosen 13/13 cm p = 32 m0.541m3SNI-7394-2008-i5,789,270.003,130,837.2210Balok Pinggang 13/13 cm p = 21 m0.355m3SNI-7394-2008-i5,789,270.002,054,611.92 Sub JumlahERROR:#VALUE!DPEKERJAAN RAMP/TANJAKAN PLAT BETON1Galian Tanah 38.220m3SNI-2835-2008-6.136,937.501,411,751.252Urugan Kembali Bekas Galian 9.555m3SNI-2835-2008-6.9ERROR:#REF!ERROR:#REF!3Urugan Pasir Alas Pondasi T = 5 cm 12.740m3SNI-2835-2008-6.11150,375.001,915,777.504Pasangan Batu Kosong Pondasi T =10 cm 2.548m3SNI-2836-2008-6.9294,869.00751,326.215Plat Pondasi Tapak Ukuran 120 x 120 cm 5.616m3SNI-7394-2008-b3,193,751.0017,936,105.626Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof 2.246m3SNI-7394-2008-c4,983,766.0011,195,531.947Kolom 30/40 cm 3.888m3SNI-7394-2008-g4,983,766.0019,376,882.218Balok Beton 30/50 cm 2.925m3SNI-7394-2008-l4,497,955.0013,156,518.389Plat Lantai Tebal 12 cm 7.817m3SNI-7394-2008-m4,247,801.0033,202,936.5210Realling Besi Hollow 42.300m2Taksir420,000.0017,766,000.00 Sub JumlahERROR:#REF!

EPEKERJAAN LANTAI Ruangan 1Timbunan Tanah Bawah Lantai T = 80 cm 89.600m3SNI. 2835 : 2008. 6.1082,000.007,347,200.002Timbunan Pasir Bawah Lantai T = 10 cm 11.200m3SNI-2835-2008-6.11129,600.001,451,520.003Beton Tumbuk Dibawah Lantai Keramik = 5 cm 5.600m3SNI-7394-2008-6.4528,699.002,960,714.404Lantai Keramik 40 x 40 cm (Polished)112.000m2SNI-7395-2008-6.34139,449.0015,618,288.00Selasar Depan 1Timbunan Tanah Bawah Lantai T = 75 cm 24.000m3SNI. 2835 : 2008. 6.1082,000.001,968,000.002Timbunan Pasir Bawah Lantai T = 10 cm 3.200m3SNI-2835-2008-6.11129,600.00414,720.003Timbunan Pasir Bawah Lantai bawah Ramp T = 10 cm 6.270m3SNI-2835-2008-6.11129,600.00812,592.004Beton Tumbuk Dibawah Lantai Keramik = 5 cm 1.600m3SNI-7394-2008-6.4528,699.00845,918.405Beton Tumbuk Dibawah Ramp = 7 cm 13.167m3SNI-7394-2008-6.4528,699.006,961,379.736Lantai Keramik 40 x 40 cm (Unpolished)32.000m2SNI-7395-2008-6.34a140,509.004,496,288.007Lantai Keramik 40 x 40 cm (Unpolished) Dibawah Ramp62.700m2SNI-7395-2008-6.34a140,509.008,809,914.30Trap Tangga1Timbunan Pasir T = 10 cm 0.180m3SNI-2835-2008-6.11129,600.0023,328.002Beton Tumbuk Dibawah Lantai Keramik = 5 cm 0.180m3SNI-7394-2008-6.4528,699.0095,165.823Lantai Keramik 40 x 40 cm (Unpolished)6.600m2SNI-7395-2008-6.34a140,509.00927,359.40 Sub Jumlah52,732,388.05FPEKERJAAN KOSEN PINTU DAN JENDELA KOSEN1Kosen Pintu/Ventilasi Type P1 (2 UNIT)0.134m3SNI-3434-2008-6.2RpERROR:#VALUE!2Kosen Jendela Type J1 (6 UNIT)0.738m3SNI-3434-2008-6.2RpERROR:#VALUE!DAUN PINTU DAN JENDELA1Pintu Type P1 (3 Unit)- Daun Pintu Panel Ukuran 55 x 210 cm 4.000UnitTaksir700,000.002,800,000.00- Pasangan Jalusi Papan 1.872m2Taksir100,000.00187,200.002Jendela Type J1 (6 Unit)- Daun Jendela Kaca 5 mm Ukuran 60 x 80 cm 24.000UnitTaksir280,000.006,720,000.00- Pasangan Jalusi Papan 9.734m2Taksir100,000.00973,440.00 Sub JumlahERROR:#VALUE!GPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag 2.000BhTaksirRp.ERROR:#VALUE!2Engsel Pintu 4 Inchi 12.000BhTaksirRp.ERROR:#VALUE!3Engsel Jendela 3 Inchi 48.000BhTaksirRp.ERROR:#VALUE!4Grendel Jendela48.000BhTaksirRp.ERROR:#VALUE!5Hak Angin Jendela48.000BhTaksirRp.ERROR:#VALUE!6Tarikan/Pegangan Jendela24.000BhTaksirRp.ERROR:#VALUE!7Kunci Pacok Untuk Pintu Double (Atas & Bawah)2.000BhTaksir22,000.0044,000.00 Sub JumlahERROR:#VALUE!HPEKERJAAN PENGECATAN 1Cat Tembok 3 x (L/D)557.805M2SNI-03-Cat-6.14.N17,183.009,584,759.882Cat Langit- Langit Plat Beton 115.750M2SNI-03-Cat-6.14a.N14,188.001,642,261.003Cat Mengkilat Kosen Pintu/Jendela0.218M2SNI-03-Cat-6.8.N24,720.005,388.964Cat Mengkilat Daun Pintu/Jendela/Jalusi 44.707M2SNI-03-Cat-6.8.N24,720.001,105,161.98 Sub Jumlah12,337,571.82IPEKERJAAN INSTALASI LISTRIK1Box Zekering/Panel MCB 1.000UnitTaksir110,000.00110,000.002Armatur- Lampu SL 18 Watt Setara Philips (Komplit)10.000BhTaksirRp.ERROR:#VALUE!3Instalasi titik penerangan, instalasi termasuk 10.000TtkTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC fitting lampu dan kelengkapan instalasi terpasang.4Instalasi titik kontak, instalasi termasuk 2.000BhTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC, kotak kontak dan kelengkapan instalasi terpasang.5Saklar Tunggal 1.000BhTaksirRp.ERROR:#VALUE!6Saklar Ganda2.000BhTaksirRp.ERROR:#VALUE! Sub JumlahERROR:#VALUE!IVPEKERJAAN LANTAI 2APEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Dinding Bata 1 : 4136.554m2SNI-6897-2008-6.986,696.0011,838,650.912Plesteran Dinding Bata 1 : 4300.667m2SNI-2837-2008-6.437,941.0011,407,614.243Pasangan Realling Dinding Pengaman Selasar Bata 1 : 49.752m2SNI-6897-2008-6.986,696.00845,442.054Plesteran Realling Dinding Pengaman Bata 1 : 419.504m2SNI-2837-2008-6.437,941.00739,986.095Realling Besi Galvanis 2"17.000m'Taksir70,000.001,190,000.006Pasangan Dinding 1/2 Bata 1Pc : 4Ps Tombak Layar 17.998m2SNI-6897-2008-6.986,696.001,560,354.617Plesteran Dinding Bata 1Pc : 4Ps Tombak Layar 17.998m2SNI-2837-2008-6.437,941.00682,862.128Plesteran 1 : 3 (Kolom dan Ringbalk)51.300m2SNI-2837-2008-6.339,662.002,034,660.60 Sub Jumlah30,299,570.61BPEKERJAAN BETON BERTULANG 1Kolom Beton 30/40 cm = 10 Unit4.560m3SNI-7394-2008-g4,983,766.0022,725,972.962Kolom Beton 30/30 cm Tinggi 380 cm = 3 Unit1.026m3SNI-7394-2008-h5,475,610.005,617,975.863Kolom Beton 30/30 cm Tinggi 270 cm = 5 Unit1.202m3SNI-7394-2008-h5,475,610.006,578,945.423Balok Diatas Kosen 13/13 cm P =32 m0.541m3SNI-7394-2008-i5,789,270.003,130,837.224Balok Pinggang 13/13 cm P = 40 m0.355m3SNI-7394-2008-i5,789,270.002,054,611.925Ring balok 18/30 cm P = 79 m4.266m3SNI-7394-2008-o4,797,954.0020,468,071.766Balok Praktis 13/13 cm pada Realling Pengaman Selasar 0.303m3SNI-7394-2008-i5,789,270.001,751,312.077Balok Top Gevel 15/25 cm 0.810m30.00RpERROR:#VALUE! Sub JumlahERROR:#VALUE!CPEKERJAAN LANTAI 1Pasangan Lantai Keramik 40 x 40 cm (Ruangan)112.000m2SNI-7395-2008-6.34139,449.0015,618,288.002Pasangan Lantai Keramik 40 x 40 cm (Selasar)32.000m2SNI-7395-2008-6.34a140,509.004,496,288.00 Sub Jumlah20,114,576.00DPEKERJAAN RANGKA ATAP 1Perkayuan Konstruksi Kuda-kuda 3.362m3SNI 03-3434-2002 (6.28)6,435,600.0021,638,103.822Gording Kayu 5/10 cm 1.380m3SNI 03-3434-2002 (6.28)6,435,600.008,881,128.003Lesplang Reuter Papan Seumanthok 2,5/25 cm 15.675m2SNI-3434-2008-6.21190,500.002,986,087.50 Sub Jumlah33,505,319.32EPEKERJAAN PENUTUP ATAP1Penutup Atap Seng Spandec Warna Cat Pabrik 0.30 238.280m2SNI-03-3436-6.32.Ha87,550.0020,861,414.002Rabung Seng Spandec Warna 0.35 Cat Pabrik 18.400m'SNI-03-3436-6.36.Ha60,305.001,109,612.00 Sub Jumlah21,971,026.00FPEKERJAAN LANGIT-LANGIT1Rangka Plafond193.264m2SNI-3434-2008-6.2077,700.0015,016,612.802Plafond Plywood T = 4 mm (Ruangan)112.000m2SNI-2839-2008-6.539,840.004,462,080.003Plafond Plywood T = 4 mm (Selasar)32.000m2SNI-2839-2008-6.539,840.001,274,880.004Plafond Plywood T= 4 mm (Piasan Atap) 49.264m2SNI-2839-2008-6.539,840.001,962,677.765List Profil212.600m'TaksirRp.ERROR:#VALUE! Sub JumlahERROR:#VALUE!GPEKERJAAN KOSEN PINTU DAN JENDELA KOSEN1Kosen Pintu/Ventilasi Type P1 (2 UNIT)0.134m3SNI-3434-2008-6.2RpERROR:#VALUE!2Kosen Jendela Type J1 (6 UNIT)0.738m3SNI-3434-2008-6.2RpERROR:#VALUE!DAUN PINTU DAN JENDELA1Pintu Type P1 (3 Unit)- Daun Pintu Panel Ukuran 55 x 210 cm 4.000UnitTaksir700,000.002,800,000.00- Pasangan Jalusi Papan 1.872m2Taksir100,000.00187,200.002Jendela Type J1 (6 Unit)- Daun Jendela Kaca 5 mm Ukuran 60 x 80 cm 24.000UnitTaksir280,000.006,720,000.00- Pasangan Jalusi Papan 9.734m2Taksir100,000.00973,440.003Ventilasi Atap4.000UnitTaksir150,000.00600,000.00 Sub JumlahERROR:#VALUE!HPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag 2.000BhTaksirRp.ERROR:#VALUE!2Engsel Pintu 4 Inchi 12.000BhTaksirRp.ERROR:#VALUE!3Engsel Jendela 3 Inchi 48.000BhTaksirRp.ERROR:#VALUE!4Grendel Jendela48.000BhTaksirRp.ERROR:#VALUE!5Hak Angin Jendela48.000BhTaksirRp.ERROR:#VALUE!6Tarikan/Pegangan Jendela24.000BhTaksirRp.ERROR:#VALUE!7Kunci Pacok Untuk Pintu Double (Atas & Bawah)2.000BhTaksir22,000.0044,000.00 Sub JumlahERROR:#VALUE!IPEKERJAAN PENGECATAN 1Cat Tembok 3 x (L/D)389.469m2SNI-03-Cat-6.14.N17,183.006,692,242.392Cat Plafond Plywood dan List Plafond 193.264m2SNI-03-Cat-6.14a.N14,188.002,742,029.633Cat Mengkilat Lesplang Kayu 31.350m2SNI-03-Cat-6.8.N24,720.00774,972.004Cat Mengkilat Kosen Pintu/Jendela27.930m2SNI-03-Cat-6.8.N24,720.00690,429.605Cat Mengkilat Daun Pintu/Jendela/Ventilasi 44.707m2SNI-03-Cat-6.8.N24,720.001,105,161.986Residu Kap Atap1.000PktTaksirRp.ERROR:#VALUE! Sub JumlahERROR:#VALUE!JPEKERJAAN INSTALASI LISTRIK1Box Zekering/Panel MCB 1.000UnitTaksir110,000.00110,000.002Armatur- Lampu SL 18 Watt Setara Philips (Komplit)10.000BhTaksirRp.ERROR:#VALUE!3Instalasi titik penerangan, instalasi termasuk 10.000TtkTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC fitting lampu dan kelengkapan instalasi terpasang.4Instalasi titik kontak, instalasi termasuk 2.000BhTaksirRp.ERROR:#VALUE!kabel NYA 2,5 mm dalam pipa PVC, kotak kontak dan kelengkapan instalasi terpasang.5Saklar Tunggal1.000BhTaksirRp.ERROR:#VALUE!6Saklar Ganda2.000BhTaksirRp.ERROR:#VALUE! Sub JumlahERROR:#VALUE!KPEKERJAAN LAIN-LAIN 1Pekerjaan Atap Canopy - Kuda-kuda Canopy 5/10 cm Diketam Halus0.08m3SNI 03-3434-2002 (6.28)6,435,600.00498,759.00- Gording Kayu 5/10 cm diketam Halus0.16m3SNI 03-3434-2002 (6.28)6,435,600.001,029,696.00- Lesplang Papan Reuter 2,5/25 cm 4.70m2SNI-3434-2008-6.21190,500.00895,350.00- Penutup Atap Seng Spandec Cat Pabrik 0.30 22.40m2SNI-03-3436-6.32.Ha87,550.001,961,120.00- Cat Mengkilat Lesplang Kayu dan Canopy 9.40m2SNI-03-Cat-6.8.N24,720.00232,368.00 Sub Jumlah4,617,293.00

taking off 1NoUraian PekerjaanSatuanDimensiKuantitatifPanjangLebarTinggi/tebalUnit/Luasabcd12345678

A.Pekerjaan Persipaan1Mobilisasi dan demobilisasiLs1.002Admistrasi dan DokumentasiLs4.003Pembersihan Lapanganm226.0016.00416.004Pasang Blowplankm'24.0014.002.0076.005Air KerjaLs1,000.006Listrik KerjaLs4.007P3k SosialLs4.008Direksi Keetm25.003.0015.009Barak Kerjam26.004.0024.00

B.Pekerjaan Tanah dan Galian1Galian Tanah Pondasim3242.9162Urugan Tanah Kembalim3242.9160.2560.7293Urugan Tanah Timbunm3266.2266.24Urugan Pasir Urugm3

C. Pekerjaan Beton Bertulang1Cor Lantai Kerjam3ERROR:#REF!ERROR:#REF!2Pasangan Batu Gunungm3242.916ERROR:#REF!3Cor Pondasi Tapak Uk.180x180 cmm34Cor Pondasi Tapak Uk.140x140 cmm35Cor Sloof Uk.15x20 cmm36Cor Balok Uk.20x45 cmm37Cor Balok Uk.20x35 cmm38Cor Ring Balok Uk. 15x20 cmm39Cor Kolom Uk. 60x40 cmm310Cor Kolom Uk. 50x30 cmm311Cor Kolom Praktis Uk. 50x30 cmm312Cor Plat Beton tanggam313Cor Plat Level beton tebal 12 cmm314Cor Plat Lantai beton Bertulang 1:2:3m3

D.Pekerjaan Pasangan Bata / Plasteran1Pasangan Batu bata ad. 1 : 2m32Pasangan dinding bata ad 1 : 4m33Plasteran Dinding ad. 1 : 2 + Acianm34Plasteran Dinding ad. 1 : 4 + Acianm3

E. Pekerjaan Lantai / Dinding Keramik1Pasangan Lantai beton cor 1:3:6 tebal 6 mmm22Pasangan Lantai Keramik Uk.40x40 cmm23Pasangan Lantai Keramik Uk.20x20 cmm24Pasangan Plint Keramik Uk.10x40 cmm'5Pasangan Plint Keramik Uk.20x20 cmm2

F.Pekerjaan Kusen Pintu, Jendela dan Kaca1Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood bh3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm2Kusen Alumunium + Pintu PVC uk.70 x 215 cmbh3Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood bh43 cm dan kaca 5 mm Bingkai Alumunium Uk.80 x 215 cmbh5Kusen Jendela Alumunium 3" + Plywood tebal 3 cm Uk. 177 x 180 cmbh6Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 50 x 270 cmbh7Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 50 x 190 cmbh8Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 347 x 457 cmbh

H.Pekerjaan Kunci / Alat Penggantung1Pasang Kunci tanahm biasabh2Pasang engsel pintu ( tiap pintu 3 engsel )bh3Pasang Engsel Jendela (tiap jendela 2 engsel)bh4Pasang grandel tanam pintu (panjang 16-30 cm)bh

IPekerjaan Plafond1Pasang plafond gypsum tebal 9 mmm22Frame Ceilingm23Pasang Cornice gypsumm'

JPekerjaan Atap1Pasang Rangka Bajam22Pasang Penutup atap genteng metal + insulation anti bocor daan panasm23Pasang Rebung Genteng Metalm'4Pasang Lisplank GRCm'

KPekerjaan Pengecatan1Cat Tembok 3 Lapis + diplamirm22Cat Plafond 3 lapis + diplamirm23Cat Lisplank + pintu panel 3 lapism2

LPekerjaan Instalasi ListrikL1Panel Listrik1Box panelUnit2MCBSet3Volt Meter & Selector switchUnit4Ampere Meter & Selector switchUnit5Grounding unit panelUnit6Kabel NYA 10 mm2m'7Wiring panel and accessoriesLsL2Armature, saklar, dan Stop Kontak1Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitorbh2Lampu TL bulat 20 W dilengkapi kapasitorbh3Lampu TL Bulat 20 Wbh4Saklar double, setara brocobh5Stop Kontak, setara brocobh6Instalasi dengan kabel NYM 4 x 2,5 mmTtk7Testing and komisioningLs

MPekerjaan Instalasi Plumbing1Instalasi Airbh202Kran Airbh83Kran Washtafelbh44Pemasangan Pengeriing air bak mandibh85Memasang floor drainbh86memasang tempat sabun keramikbh87memasang closet jongkokbh88Memeasang pipa air besih type AW dia. 1 " + Accessoriesm'95.222+2(4+2+1+0,6+0,6+1,8+1,8)+(1+0,5+0,5)47.69Memeasang pipa buangan air kotor type AW dia. 3" + Accessoriesm'95.210Memeasang pipa buangan air kotor type AW dia. 4" + Accessoriesm'6822+4+4+2+23411Urinoirm'1812Bak Cuci Tangan / Washtafel keramikbh413Showerbh8

NPekerjaan Septictank1Pekerjaan Galian tanah m32Pekerjaan timbunan kembali lubang galianm33Cor Plat Lantai Beton Bertulang 1 : 2 : 3m34Cor beton 1:2:3m35Pekerjaan Pasir Urugm36Pasangan Bata 1:2m37Plasteran 1 : 2m28IjukKg9Pipa PVC 4"m310Kerikilm311Pipa Hawam'

perhitungan Vol. lt.1PEKERJAAN PASANGAN DAN PLESTERAN A.PEKERJAAN TANAH DAN PONDASIPEKERJAAN LANTAI PEKERJAAN BETON BERTULANG PEKERJAAN LANGIT-LANGITGalian tanah pondasiUrugan Tanah TimbunPEKERJAAN LANTAI IPekerjaan Rollag Tangga Pada Selasar 1. Pasangan Trasram Bata 1 : 2 dibawah Lantai Ruangan1Sloof Beton 15/25 cm (Pondasi Menerus) p = 119,9 m1Pasang plafond gypsum tebal 9 mmPEKERJAAN TANAH DAN PONDASIPEKERJAAN RAMP/TANJAKAN TANGGA1.Pondasi MenerusIIIPEKERJAAN SELASAR DAN TRAP TANGGADepanTinggi0.5m1. Timbunan Tanah Bawah Lantai T = 60 cm Panjang sloof119.9mNamaLuas1.Galian Tanahsumbu tegaksumbu datarDibawah Lantai :Pekerjaan Selasar Depan dan BelakangGalian Tanah Panjang = panjang seluruh sloof119.9mRuanganPenampang sloof0,15x0,250.0375m2Selasar Depan(1,7 x 20) 34m21- Stik Kolom 40/60 cm dari Pondasi Tapak ke sloof Panjang1.48mSumbu Panjang (as-as)P. RilSumbu Panjang (as-as)P.RilSelasar Depan(1,7 x 20) + ( 1,5 x 20)64m2sumbu tegaksumbu datar1panjang1,03+1,032.06mLuas59.95m2R.Istirahat Dosen5x4,321.5m2Volume sloof119,9x0,033.597m3Selasar Dalam(4 x 8,3)+(4,3 x 7 )63.3m2Lebar1.5mA-R8.35.6M-A2014.6Selasar Dalam(4 x 8,3)+(4,3 x 7 )63.3m2Sumbu PanjangP. RiltrasramSumbu PanjangP.Riltrasramtinggi1mR.Sie Keuangan8x4,334.4m2R.istirahat4,3 x 521.5m2A. Pondasi TapakTinggi2.1mC-P44N-A6.26.2R.istirahat4,3 x 521.5m2A-R1.70.81.1R-A1611.414.6Lebar galian atas = 1+(2x0,2)1.4m2.Plesteran Trasram Bata 1 : 2 dibawah Lantai R.Sie Akademik8x432m22Sloof Beton 15/25 cm (Selasar Depan,belakang) P = 53,46 mPantry4 x 520m2Panjang1.8mVolume1,48x1,5x2,14.662M3D-P44J-A3.23.2Pantry4 x 520m2F-T32.12.4Tambahan2.062.062.06Luas Penampang = (1+1,4)/2*0,91.08m2Luas119.9m2Pantri5x420m2Panjang sloof53.46mTangga3 x 412m2Lebar1.8mE-Q8.35.6P-A139.4Tangga3 x 412m2G-T32.12.4Volume = 1.08m3107.9m2Penampang sloof0,15x0,250.0375m2R.Sie Keuangan8 x 4,334.4m2Tinggi0.2m2. Anak TanggaF-T8.35.6Q-A2020R.Sie Keuangan8 x 4,334.4m2K-R1.70.81.13. Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm Volume ruangan107,9x0,664.74m3Volume sloof53,46x0,032.00475m3R.Sie Akademik8 x 432m2Volume0.648m3Jumlah 21BuahG-T8.36.5R.Sie Akademik8 x 432m2Pengurangan volume kamar mandi4x(0,8x1,35x0,05)0.216m3Teras7 x 214m2Panjang1.8mLebar1.425mH-P44Teras7 x 214m2Selasar belakang2Urugan Pasir Alas Pondasi t = 5 cm sumbu tegak3Kolom Beton 40/60 cm = 13 Kolom 5 x 15m2Lebar1.8mPanjang0.29mI-P445 x 15m2Sumbu PanjangP. RiltrasramSumbu PanjangP.Riltrasrampanjang1,03+1,032.06mSumbu PanjangJ.LuasL.BetonBidang KusenTembok 1:2Tembok 1:4Penambahan volume kamar mandi4x(0,65x1,35x0,05)0.1755m3Jumlah kolom13BuahVolume236.2m2Tinggi0.1mTinggi0.2mK-R8.35.6Volume Tanah Timbun266.2m2B-M1.51.51.5K-A2018.619.4tinggi0.052.06mA-O8.3029.884.865.095.5114.42Panjang3.6mVolume0.108m3Volume1/2x21x1,425x0,29x0,20.867825M3JUMLAH57.544.962.453.4F-M1.50.81.2lebar1mB-M3.0010.801.084.285.45Volume total 64.6995m3Penampang kolom0,4x0,60.24m2Total Panjang (as-as)119.9m(Sloof)Pondasi Batu KaliG-M1.50.81.2volume0.103m3C-L2.509.000.543.644.82Volume Kolom0,24x3,6x,1311.232m32Pasang Cornice gypsumB. Stik Kolom Total Panjang Ril98.3mJ-M1.51.51.5D-N8.3029.885.405.562.5316.392.Timbunan Pasir Bawah Lantai T = 10 cm Selasar Depan2x(1,7+20)43.4m2Panjang0.4mPanjang98.3E-M4.0014.404.863.645.90Volume107,9x0,110.79m34Kolom Beton 30/50 cm = 4 Kolom Selasar Dalam(2x(4+8,3))+(2x(4,3+7))47.2m2Lebar0.6m4. Stik Kolom cm dari Pondasi Tapak ke sloof Lebar Pondasi K11.8mPenampang(0,6+0,3)/2x0,80.36Jumlah15.410.412.438.0632.0636.063Lantai Kerja Plat Beton 60 x 60 cm F-N8.3029.883.248.301.5116.83Jumlah kolom4BuahR.istirahat2x(4,3+5)18.6m2Tinggi2.15ma.Stik kolomLebar 1/2 Pondasi K10.9mpanjang1,03+1,032.06mG-M3.0010.800.540.776.893. Beton Tumbuk Dibawah Lantai Keramik = 5 cm Panjang3.6mPantry2x(4+5)18m2Volume0.516m3Panjang1.5mLebar Pondasi K21.4mVolume35.388Total Panjang53.46mtinggi0.1mH-M3.0010.801.084.285.45Volume107,9x0,055.395m3Penampang kolom0,3x0,50.15m2Tangga2x(3+4)14m2Lebar0.3mLebar 1/2 Pondasi K20.7mTotal Panjang Ril42.46mlebar0.6mI-O8.3029.884.865.095.5114.42Volume Kolom0,15x3,6x,42.16m3R.Sie Keuangan2x(8+4,3)24.6m2Jumlah13BuahTinggi1.25mTotal Trasram48.46mvolume0.1236m3Total175.3226.4624.0431.6690.574. Lantai Keramik 40 x 40 cm (Polished)R.Sie Akademik2x(8+4)24m2Volume Total16.54m3Volume1,48x1,5x2,10.5625M3Penampang Galian 1 : 5Luas Seluruh Ruangan107.9m25Kolom PraktisTeras(2x(7+2))+(2x(5+1))30m2tinggi galian = 1 mLebar Kolom K10.6m0.44Pasangan Trasram Bata 1 : 2UraianLuas Kamar Mandi4x1,6x1,59.6m2Jumlah kolom17Buahb. Pondasix = 0,2 meterLebar Kolom K20.5m0.3Panjang (1,2+1,2)+2,35+410.35m3.1 A-O = I-O3.2 B-M = H-M98.3m2Panjang3.6mVolume219.8m22- Stik Kolom 30/50 cm dari Pondasi Tapak ke sloof Panjang1.5mLebar bagian bawah 1 meterLebar Pondasi K11.8mtinggi0.4mA. Luas DindingA. Luas Dinding5. Lantai Keramik 20 x 20 cm (Polished)Penampang kolom0,15x0,150.0225m2Lebar1.18mLebar 1/2 Pondasi K10.9mLuas8.28m2Panjang 8.3mPanjang 3mLuas kamar mandi(4x1,6x1,5)+(1,5x3)14.1m2Volume Kolom1.377m3A. Pondasi TapakTinggi0.35mLebar Pondasi K21.4mtinggi3.6mtinggi3.6mPanjang1.4mVolume1,48x1,5x2,10.75225M3Lebar galian atas = 1+(2x0,2)1.4mLebar 1/2 Pondasi K20.7mLuas8,3x3,629.88m2Luas3x3,610.8m26Balok Lantai B1 25/45 cm Lebar1.4mLuas Penampang = (1+1,4)/2*11.08m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang Betonsumbu tegaksumbu datarTinggi0.2mVolume total1.31475m3Volume = 106.164m3Penampang Galian 1 : 5Tinggi3.6mTinggi3.6mSelasar Sumbu PanjangSumbu PanjangVolume0.392m3tinggi galian = 90 cmLebar0,6+0,3+(3x0,15)1.35mLebar2x0,150.3m1. Timbunan Tanah Bawah Lantai T = 60 cm A-Q10L-A20Panjang1.4m2.Pondasi Setempatx = 0,2 meterLuas4.86m2Luas1.08m2Selasar Depan1,7x2034m2D-R10.5O-A20Lebar1.4mLebar bagian bawah 1 meterC.Luas Kusen (JKM dan J4)C. Luas Tembok 1:2Selasar Tengah(7x8,3)-(1,5X3)53.6m2E-T13Q-A20Tinggi0.1mPondasi K1Luas3x(0,52x0,54)+(2,36x1,8)5.0904m2Luas(2,85x1,5)4.275m2Selasar Belakang1,5x2030m2F-T13Volume0.0653333333m3Lebar Pondasi K11.8mD. Luas Tembok 1:2D.Luas Pasangan Tembok 1:4117.6m2L-Q10jumlah13mLebar galian atas = 1+(2x0,2)1.4mLuas(3,1x1,5)+(0,2x4,3)5.51m2LuasA-(B+C+D)5.445m2Volume117,6x0,670.56m3Total56.560B. Stik Kolom tinggi galian 2.8mLuas Penampang = (1+1,4)/2*0,91.08m2E.Luas Pasangan Tembok 1:4Panjang0.3mVolume = 45.8568m3LuasA-(B+C+D)14.4196m22.Timbunan Pasir Bawah Lantai T = 10 cm Panjang116.5mLebar0.5mVolume117,6x0,111.76m3Penampang Balok0.09m2Tinggi1.8mVolume13x2,8x1,8x1,8117.936m3Transram 1:2 selasar3.3 C-L3.4 D-NVolume Balok10.485m3Volume0.27m3Tebal 0.2mA. Luas DindingA. Luas Dinding3. Beton Tumbuk Dibawah Lantai Keramik = 5 cm Pondasi K2Panjang 48.46m2Panjang 2.5mPanjang 8.3mVolume117,6x0,055.88m3Jumlah4Buahtinggi galian 2.4mLuas Trasram 1 : 2 9.692m2tinggi3.6mtinggi3.6m7Balok Lantai B2 20/35 cm Volume Total2.91m3Lebar Pondasi K21.4mLuas3x3,69m2Luas8,3x3,629.88m24. Lantai Keramik 40 x 40 cm (Polished)sumbu tegaksumbu datarjumlah4mB. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonLuas Seluruh Selasar117.6m2Sumbu PanjangSumbu PanjangTinggi3.6mTinggi3.6mLuas Kamar Mandi3x1,54.5m2C-N3M-A4.4Volume18.816m3Lebar1x0,150.15mLebar0,6+0,6+(2x0,15)1.5m113.1m2G-Q6N-A5Luas0.54m2Luas5.4m2H-O13P-A20Volume Total Galian242.916m3C. Luas Tembok 1:2C.Luas Kusen (PJ1)I-M10Luas(2,425x1,5)3.6375m2Luas2x(0,36x2,3)+(1,5x2,6)5.556m2Rollag TanggaSelasar(14x0,45)+19+4,8+(2x0,8)+(2x6)+(2x2)+(2x1,2)+3,6D.Luas Pasangan Tembok 1:4D. Luas Tembok 1:21. Timbunan Tanah Bawah Lantai T = 60 cm LuasA-(B+C+D)4.8225m2Luas(0,9x1,5)+(0,2x5,9)2.53m2Luas (7x2)+(0,6*5)17m2E.Luas Pasangan Tembok 1:4Volume14x0,610.2m353.7LuasA-(B+C+D)16.394m2Total85.729.42.Timbunan Pasir Bawah Lantai T = 10 cm Panjang115.1mVolume10,2x0,11.7m3Penampang Balok0.07m23.5 E-M3.6 F-NVolume Balok8.057m3A. Luas DindingA. Luas Dinding3. Beton Tumbuk Dibawah Lantai Keramik = 5 cm Panjang 4mPanjang 8.3mVolume10,2x0,050.85m3tinggi3.6mtinggi3.6m8Plat Lantai T = 10 cm Luas4x3,614.4m2Luas8,3x3,629.88m24. Lantai Keramik 40 x 40 cm (Polished)Teba;0.1mB. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonLuas Seluruh rolag tangga17-(0,8x2,35)15.12m2Luas I4x520m2Tinggi3.6mTinggi3.6mLuas II6x530m2Lebar0,6+0,6+0,151.35mLebar0,6+(2x0,15)0.9mLuas III3x4,714.1m2Luas4.86m2Luas3.24m2Luas IV12x448m2C. Luas Tembok 1:2C.Luas Kusen (J3B dan PJ1)Luas V12x672m2Luas(0,9x1,5)+(0,2x2,5)3.6375m2Luas((2x0,36x2,3)+(1,5x2,6))+((2x0,4x1,45)+(1,22x1,3))8.302m2Luas VI(6,75x2)+(4,8x1,2)19.26m2D.Luas Pasangan Tembok 1:4D. Luas Tembok 1:2Total203.36m2LuasA-(B+C+D)5.9025m2Luas(0,2x7,55)1.51m2E.Luas Pasangan Tembok 1:4Volume20.336m3LuasA-(B+C+D)16.828m23.7 G-MA. Luas DindingPanjang 3mtinggi3.6mLuas3x3,610.8m2B. Luas Dinding Tiang BetonTinggi3.6mLebar0.150.15mLuas0.54m2C.Luas Kusen (P1B)Luas1x2,62.6m2D. Luas Tembok 1:2Luas0,2x3,850.77m2E.Luas Pasangan Tembok 1:4LuasA-(B+C+D)6.89m2sumbu DatarSumbu PanjangJ.LuasL.BetonBidang KusenTembok 1:2Tembok 1:4J-A16.0057.607.0214.496.8429.26K-A6.2022.321.625.046.419.25L-A3.2011.520.543.361.805.82M-A13.0046.800.597.805.1333.28N-A13.0046.800.5416.562.5426.62Total185.0410.3147.2522.71104.23Volume Total360.3636.7771.2954.37194.79Sumbu Tegak+Lurus3.1 J-A3.2 K-AA. Luas DindingA. Luas DindingPanjang 16mPanjang 6.2mtinggi3.6mtinggi3.6mLuas16x3,657.6m2Luas6,2x3,622.32m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonTinggi3.6mTinggi3.6mLebar0,4+0,4+0,4+(5x0,15)1.95mLebar(3x0,15)0.45mLuas7.02m2Luas1.62m2C.Luas Kusen (J2B,P1B,JKM2)C.Luas Kusen (PKM.PKMB)Luas(4x1,2x1,8)+(2x1x2,6)+(1,2x0,54)14.488m2Luas(2X0,8x2,10)+(0,8x2,10)5.04m2D. Luas Tembok 1:2D. Luas Tembok 1:2Luas(3,65x1,5)+(0,2x(1,75+5,05))6.835m2Luas(1,5x4,275)6.4125m2E.Luas Pasangan Tembok 1:4E.Luas Pasangan Tembok 1:4LuasA-(B+C+D)29.257m2LuasA-(B+C+D)9.2475m23.3 L-A3.4 M-AA. Luas DindingA. Luas DindingPanjang 3.2mPanjang 13mtinggi3.6mtinggi3.6mLuas1,5x3,611.52m2Luas13x3,646.8m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonTinggi3.6Tinggi3.6mLebar(1x0,15)0.15Lebar(0,4+0,4+0,15+0,15)x0,150.165mLuas0.54m2Luas0.594m2C.Luas Kusen (PKM.PKMB)C.Luas Kusen (P1)Luas(2X0,8x2,10)3.36m2Luas(3x1x2,6)7.8m2D. Luas Tembok 1:2D. Luas Tembok 1:2Luas(1,5x1,2)1.8m2Luas(2x1,325x1,5)+(5,75x0,2)5.125m2E.Luas Pasangan Tembok 1:4E.Luas Pasangan Tembok 1:4LuasA-(B+C+D)5.82m2LuasA-(B+C+D)33.281m23.5 N-AA. Luas DindingPanjang 13mtinggi3.6mLuas13x3,646.8m2B. Luas Dinding Tiang BetonTinggi3.6mLebar2x0,150.3mLuas1.08m2C.Luas Kusen (J2)Luas(6x1,2x2,3)16.56m2D. Luas Tembok 1:2Luas0,2x(13-0,3)2.54m2E.Luas Pasangan Tembok 1:4LuasA-(B+C+D)26.62m2Dinding Keramik 30x60 kamar mandiPanjang Kamar mandiPanjang K.mandi 11,45+1,35+0,653.45m'Panjang K.Mandi 23+0,85++1,55.35m'8.8m'tinggi1.8m'Luas15.84m2Westafel 11.35m'Westafel 10.85m'`2.2m'tinggi0.90.765m2Luas Total16.605m2

perhitungan vol.Lt2

PEKERJAAN PASANGAN DAN PLESTERAN PEKERJAAN BETON BERTULANG PEKERJAAN LANTAI PEKERJAAN LANGIT-LANGITPEKERJAAN SEPTICTANKPEKERJAAN BETON TAK BERTULANG 1Pasangan Dinding Bata 1 : 41Pasangan Lantai Keramik 40 x 40 cm (Ruangan)1Pasang plafond gypsum tebal 9 mm1Pekerjaan Galian tanah 1Kolom Beton 40/60 cm = 11 Kolom RuanganLuasNamaLuasA. Main Hole1Beton Cor pada Selasar Belakang sumbu tegakJumlah kolom11BuahR. Rektor(3,4x11)+(1,6x9)51.8m2R. Rektor5x1155m2Panjang 0.5mA.KolomSumbu PanjangJ.LuasL.BetonBidang KusenTembok 1:2Tembok 1:4Panjang3.6mR.Tunggu3,5x8,4329.505m2R.Tunggu3,5x8,4329.505m2Lebar0.5mTinggi4mA-P10.437.44.96.43.822.5Penampang kolom0,4x0,60.24m21,5x6,8610.29m21,5x6,8610.29m2tinggi0.4mLebar0.15mB-L2.48.60.33.64.8Volume Kolom0,24x3,6x,119.504m31x4,84.8m21x4,84.8m2Volume0.1m3Panjang0.3mC-P10.437.42.75.629.93x39m2(3x3)+(4,5x3)22.5m2Jumlah 6BuahD-Q2.09.00.58.52Kolom Beton 40/60 cm Tinggi 570 cm = 2 UnitR.Sie Keperetawatan3x412m2R.Sie Keperetawatan3x412m2B.Septic TankVolume1.08m3E-R8.432.62.729.9Jumlah kolom2BuahR.Tamu(4x4,5)+(1,5x8)30m2R.Tamu(4x4,5)+(1,5x8)30m2Panjang 2.4mF-R7.027.62.225.4Panjang5.7mR.Admistrasi(6,5x6,58)+(1,5x3)47.27m2R.Admistrasi(6,5x6,58)+(1,5x3)47.27m2Lebar1m2Beton Cor Pada Selasar BelakangG-R7.528.41.66.520.3Penampang kolom0,4x0,60.24m2R.Sie Analisis2,5x2,56.25m2R.Sie Analisis2,5x2,56.25m2tinggi2mTinggi1.5mH-N4.415.81.12.612.2Volume Kolom0,24x3,6x,112.736m3R.Sie Keuangan2.5x2,562.5m2R.Sie Keuangan2.5x2,562.5m2Volume4.8m3Lebar0.3mI-L1.98.60.33.64.8Luas Total263.415m2K.mandi1,5x1,82.7Panjang4,8+1+16.8mJ-P10.437.44.96.43.822.53Kolom PraktisLuas Total282.815m2C. Filter BedVolume3.06m3Total243.021.127.414.7180.7Jumlah kolom26Buah2Pasangan Lantai Keramik 20 x 20 cm (Ruangan)Panjang 1.5mPanjang3.6mK.Mandi(2x2,8)+(1,6x2)8.8m22Pasang Cornice gypsumLebar1mPenampang kolom0,15x0,150.015m2R. Rektor2(5+11)32m'tinggi1.5mUraianVolume Kolom1.404m3R.Tunggu2x2(1,03+5)24.12m'Volume2.25m33.1 A-P = J-P3.2 B-L = I-L2(4,8+5,85)21.3m'A. Luas DindingA. Luas Dinding4Ring balok 15/20 cm P = 79 m2(1,57+11)25.14m'Total7.15m3Panjang 10.4mPanjang 2.4msumbu tegaksumbu datar2(1,03+7)16.06m'tinggi3.6mtinggi3.6mSumbu PanjangSumbu PanjangR.Sie Keperetawatan2(3+4)14m'Luas10,4x3,637.44m2Luas2,4x3,68.64m2A-R10+0,510.5K-A20-0,5-0,519R.Tamu2(4+4,5)+2(1,5+8)36m'3Cor Plat Lantai 1 : 2 : 3B. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonB-M1,5+0,52L-A20R.Admistrasi2(6,5+6,58)+(1,5+3)30.66m'main hole 0,05x0,5x0,50.0125m3Tinggi3.6mTinggi3.6mC-R10+0,510.5M-A1,6+1,2+1,64.4R.Sie Analisis2(2,5+2,5)10m'septic tank0,1x(0,8+0,3+0,1+1,6)x10.28m3Lebar(0,6x2)+0,151.35mLebar0,5x0,150.075mD-S5N-A5+16R.Sie Keuangan2(2,5+2,5)10m'filterbed0,1x1,5x10.15m3Luas4.86m2Luas0.27m2E-T6,75+5,85+0,513.1O-F5,2+1,2+1,68K.mandi2(1,5+1,8)6.6total0.4425m3C.Luas Kusen (J4, J1 dan JKM)C. Luas Tembok 1:2F-T3+5,858.85P-D1,03+4,8+1,036.86Luas(0,52x0,54)+(2,36x1,8)+(2x0,4x2,3)6.3688m2Luas(2,4x1,5)3.6m2G-S5Q-A2(6,08+0,5)13.16Luas Total225.88m'4Cor Beton Bertulang 1:2:3D. Luas Tembok 1:2D.Luas Pasangan Tembok 1:4H-R4+0,54.5R-A2x6,0812.16main hole 0,05x0,4x0,50.125m3Luas(2,5x1,5)3.75m2LuasA-(B+C+D)4.77m2I-M1,5+0,52S-T1,03+1,032.06septic tank(0,1x2,4x1,5)+(0,1x1,125x0,9)0.46125m3E.Luas Pasangan Tembok 1:4J-R10+0,5+0,511T-E4.83Plafond Calcyboardtotal0.58625m4LuasA-(B+C+D)22.4612m2Total72.4596.44keliling Bangunan20+(0,5+0,5)21m'10+0,5+0,511m'5Pekerjaan Pasir UrugPanjang168.89m10+0,5+0,511m'main hole 0,15x1,5x10.225m3Penampang Balok0.03m2(0,5+5+1,57+1,5+1,03)9.6m'3.3 C-P3.4 D-QVolume Balok5.0667m3(0,5+5+1,57+1,5+1,03)9.6m'A. Luas DindingA. Luas Dinding62.2m'6Pasangan Bata 1:2Panjang 10.4mPanjang 2mLebar0.5main hole (0,35+0,35)0,40.28m2tinggi3.6mtinggi4.5mLuasn Total31.1m2septic tank(2+1,62)0,93.258m2Luas10,4x3,637.44m2Luas2x4,59m2filterbed(1,5+1,5)0,852.55m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang Betontotal6.088m2Tinggi3.6mTinggi3.6mLebar(2x0,3)+0,150.75mLebar1x0,150.15mLuas2.7m2Luas0.54m2C.Luas Kusen (PJ1)C.Luas Pasangan Tembok 1:4Luas(2x0,36x2,3)+(1,5x2,6)5.556m2LuasA-B8.46m2D.Luas Pasangan Tembok 1:4LuasA-(B+C+D)29.184m23.5 E-R3.6 F-RA. Luas DindingA. Luas DindingPanjang 7,4 dan 1mPanjang 6 dan 1mtinggi3,6 dan 6mtinggi3,6 dan 6mLuas(7,4x3,6)+(1x6)32.64m2Luas(6x3,6)+(1x6)27.6m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonTinggi3.6mTinggi3.6mLebar(2x0,3)+0,150.75mLebar0,3+(2x0,15)0.6mLuas2.7m2Luas2.16m2C.Luas Pasangan Tembok 1:4C.Luas Pasangan Tembok 1:4LuasA-B29.94m2LuasA-B25.44m2

3.7 G-R3.8 H-NA. Luas DindingA. Luas DindingPanjang 6 dan 1,5mPanjang 4.4mtinggi3,6 dan 4,5mtinggi3.6mLuas(6x3,6)+(1,5x4,5)28.35m2Luas4,4x3,615.84m2B. Luas Dinding Tiang BetonB. Luas Dinding Tiang BetonTinggi3.6mTinggi3.6mLebar3x0,150.45mLebar2x0,150.3mLuas1.62m2Luas1.08m2C.Luas Kusen (PJ1 dan J1)C.Luas Kusen (P1)Luas(2x0,36x2,3)+(1,5x2,6)+(0,4x2,3)6.476m2Luas1x2,62.6m2D.Luas Pasangan Tembok 1:4D.Luas Pasangan Tembok 1:4LuasA-(B+C)20.254m2LuasA-(B+C)12.16m2sumbu DatarSumbu PanjangJ.LuasL.BetonBidang KusenTembok 1:2Tembok 1:4K-A20.072.004.1417.386.6043.88L-A4.415.840.812.667.33M-A4.014.405.418.99N-F6.523.401.2622.14O-E5.018.001.082.6014.32P-A13.147.301.269.2036.48Q-D2.19.271.351.846.08R-E4.828.801.206.5321.08Total229.0116.5137.549.26160.31Volume Total472.0437.5764.9123.96340.96

3.1 K-AA. Luas Dinding3.2 L-APanjang 20mA. Luas Dindingtinggi3.6mPanjang 4.4mLuas20x3,672m2tinggi3.6mB. Luas Dinding Tiang BetonLuas4,4x3,615.84m2Tinggi3.6mB. Luas Dinding Tiang BetonLebar0,4+(5x0,15)1.15mTinggi3.6mLuas4.14m2Lebar1,5x0,150.225mC.Luas Kusen (J1 dan J6)Luas0.81m2Luas(12x0,4x2,3)+(3,52x1,8)17.376m2C. Luas Tembok 1:2D. Luas Tembok 1:2Luas(1,775x1,5)2.6625m2Luas(1,5x4,4)6.6m2D.Luas Kusen (PKM)E.Luas Pasangan Tembok 1:4Luas(3x0,8x2,1)5.04m2LuasA-(B+C+D)43.884m2E.Luas Pasangan Tembok 1:4LuasA-(B+C+D)7.3275m2

3.3 M-AA. Luas Dinding3.4 N-FPanjang 4mA. Luas Dindingtinggi3.6mPanjang 6.5mLuas4x3,614.4m2tinggi3.6mB. Luas Dinding Tiang BetonLuas6,5x3,623.4m2Tinggi3.6mB. Luas Dinding Tiang BetonLebar1,5x0,151.5015mTinggi3.6mLuas5.4054m2Lebar0,2+0,150.35mC.Luas Pasangan Tembok 1:4Luas1.26m2LuasA-B8.9946m2C.Luas Pasangan Tembok 1:4LuasA-B22.14m23.5 O-EA. Luas Dinding3.6 P-APanjang 5mA. Luas Dindingtinggi3.6mPanjang 13.14mLuas5x3,618m2tinggi3.6mB. Luas Dinding Tiang BetonLuas13,14x3,647.304m2Tinggi3.6mB. Luas Dinding Tiang BetonLebar2x0,150.3mTinggi3.6mLuas1.08m2Lebar3x0,150.45mC.Luas Kusen (P1)Luas1.62m2Luas1x2,62.6m2C.Luas Kusen (J1)D.Luas Pasangan Tembok 1:4Luas(10x0,4x2,3)9.2m2LuasA-(B+C)14.32m2D.Luas Pasangan Tembok 1:4LuasA-(B+C)36.484m23.7 Q-DA. Luas Dinding3.8 R-EPanjang 2.06mA. Luas Dindingtinggi4.5mPanjang 4.8mLuas2,06x4,59.27m2tinggi6mB. Luas Dinding Tiang BetonLuas4,8x628.8m2Tinggi4.5mB. Luas Dinding Tiang BetonLebar2x0,150.3mTinggi6mLuas1.35m2Lebar0.20.2mC.Luas Kusen (J1)Luas1.2m2Luas(2x0,4x2,3)1.84m2C.Luas Kusen (J3)D.Luas Pasangan Tembok 1:4Luas2,25x2,96.525m2LuasA-(B+C)6.08m2D.Luas Pasangan Tembok 1:4LuasA-(B+C)21.075m2

pembesian Lt I1Sloof Beton 15/20 cm (Pondasi Menerus) =Harus DiisiTulangan bajaDiameter nimonal (mm)Luas nominal (cm2)Berat nominal (Kg/m)=Jangan DigangguPolosDeform=HasilP6D660.2830.222Panjang=46.8mP8D880.5030.395B=0.6mP9D990.6360.499H=0.4mP10D10100.7850.617Jumlah Tulangan Utama=18mP12D12121.1310.888Ukuran Tulangan Utama=20mmP13D13131.3271.040Ukuran Sengkang=10mmP14D14141.5401.210Jarak Antar Sengkang=0.15mP16D16162.0111.580P18D18182.5452.000Volume Beton=11.232m3P19D19192.8352.300Panjang Total Tulangan Utama=842.400mP20D20203.1422.470Panjang Besi /Sengkang=1.780m/SengkangP22D22223.8012.980Jumlah Sengkang=312.000BuahP25D25254.9093.850panjang Total Sengkang=555.360mD28286.1574.830Berat Tulangan Utama=2.470Kg/m'D29296.6055.190Berat Sengkang=0.617Kg/m'P32D32328.0436.310Berat Total Tulangan Utama=2080.728KgD363610.1797.990Berat Total Sengkang =342.657KgD404012.5659.870Berat Tulangan=2423.385KgD505019.63515.400Persentase Penambahan Berat=0.000%Penambahan 0 %=0.000KgTotal Berat Tulangan=2423.385KgBerat Tulangan Dalam 1 M3=215.757kg/m3

taking off 2NoUraian PekerjaanSatuanDimensiKuantitatifPanjangLebarTinggi/tebalUnit/Luasabcd12345678IPEKERJAAN PERSIAPAN1Mobilisasi dan demobilisasiLs1.002Admistrasi dan DokumentasiLs4.003Pembersihan Lapanganm226.0016.00416.004Pasang Blowplankm'24.0014.002.0076.005Air KerjaLs1000.006Listrik KerjaLs4.007P3k SosialLs4.008Direksi Keetm25.003.0015.009Barak Kerjam26.004.0024.00

IIPEKERJAAN STRUKTUR BAWAH APEKERJAAN TANAH DAN PONDASI1Pondasi Tapak Type P1 = 13 Unit- Galian Tanah Pondasi m31.801.802.8013.00117.94- Urugan Kembali Bekas Galian m3117.940.2529.48- Urugan Pasir Alas Pondasi t = 5 cm m31.801.800.0513.002.11- Lantai Kerja Plat Beton 180 x 180 cm m31.801.800.1013.004.21- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm m313.0016.54dari Pondasi Tapak ke sloof 2Pondasi Tapak Type P2 = 4 Unit- Galian Tanah Pondasi m31.401.402.404.0018.82- Urugan Kembali Bekas Galian m318.820.254.70- Urugan Pasir Alas Pondasi t = 5 cm m31.401.400.054.000.39- Lantai Kerja Plat Beton 140 x 140 cm m31.401.400.104.000.78- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm m34.002.91dari Pondasi Tapak ke sloof 3Pondasi Menerus (sloof 15/25 cm)- Galian Tanah Pondasi Menerusm3106.16- Urugan Kembali Bekas Galian m3106.160.2526.54- Urugan Pasir Alas Pondasi t = 5 cm m398.301.000.054.0019.66- Lantai Kerja Plat Beton 60 x 60 cm m398.300.600.105.90- Pasangan Batu Gunung 1 : 4 m398.300.3635.39

IIIPEKERJAAN LANTAI IAPEKERJAAN SELASAR DAN TRAP TANGGAPekerjaan Selasar Depan dan Belakang1Galian Tanah Pondasi Menerusm345.862Urugan Kembali Bekas Galian m345.860.2511.463Urugan Pasir Alas Pondasi t = 5 cm m342.461.000.052.124Lantai Kerja Plat Beton m342.460.600.102.555Pasangan Batu Gunung 1 : 4 m342.460.3615.296Pasangan Trasram Bata 1 : 2 m348.460.209.697Plesteran 1 : 2m39.692.0019.38Pekerjaan Rollag Tangga Pada Selasar 1Galian Tanah m31.082Urugan Kembali Bekas Galian m30.250.273Urugan Pasir Alas Pondasi t = 5 cm m36.094Lantai Kerja Plat Beton 60 x 60 cm m36.095Pasangan Trasram Bata 1 : 2m28.286Plesteran Bata 1 : 2m22.0016.56

BPEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Trasram Bata 1 : 2 dibawah Lantai m259.952Plesteran Trasram Bata 1 : 2 dibawah Lantai m2119.903Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm m254.374Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm m254.372.00108.745Pasangan Dinding Bata 1 : 4m2194.796Plesteran Dinding Bata 1 : 4m2194.792.00389.587Dinding Keramik 30x60 kamar mandim216.618Plesteran 1 : 3 (Kolom dan Balok)m226.462.0052.92

CPEKERJAAN BETON BERTULANG 1Sloof Beton 15/25 cm (Pondasi Menerus) m33.602Sloof Beton 15/25 cm (Selasar Depan,belakang) m32.003Kolom Beton 40/60 cm = 13 Kolom m311.234Kolom Beton 30/50 cm = 4 Kolom m32.165Kolom Praktism31.386Balok Lantai 20/45 cm m310.497Balok Lantai 20/35 cm m38.068Plat Lantai T = 10 cm m320.34

DPEKERJAAN RAMP/TANJAKAN TANGGA1Galian Tanah m31.481.502.104.662Urugan Kembali Bekas Galian m34.660.251.173Urugan Pasir Alas Pondasi t = 5 cm m31.481.500.050.114Lantai Kerja Plat Beton 150 x 150 cm m31.481.480.100.226Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof m31.317Bordesm31.503.000.100.458Anak Tanggam31.430.190.2921.000.829Plat Lantai Tebal 6 cm m33.251.430.062.000.5610Realling Besi Hollow m245.0011Keramik + Spesim21.430.3021.008.98EPEKERJAAN LANTAI Ruangan 1Timbunan Tanah Bawah Lantai T = 60 cm m364.702Timbunan Pasir Bawah Lantai T = 10 cm m310.793Beton Tumbuk Dibawah Lantai Keramik = 5 cm m35.404Lantai Keramik 40 x 40 cm (Polished)m298.305Lantai Keramik 20 x 20 cm (Polished) kamar mandim214.10Selasar 1Timbunan Tanah Bawah Lantai T = 60 cm m370.562Timbunan Pasir Bawah Lantai T = 10 cm m311.763Beton Tumbuk Dibawah Lantai Keramik = 5 cm m35.884Lantai Keramik 40 x 40 cm (polished)m2113.10Rollag Tangga1Timbunan Tanah Bawah Lantai T = 60 cm m310.202Timbunan Pasir T = 10 cm m31.703Beton Tumbuk Dibawah Lantai Keramik = 5 cm m30.854Lantai Keramik 40 x 40 cm (Polished)m215.12

FPEKERJAAN KOSEN PINTU DAN JENDELA 1Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood bh2.003 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)2Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )bh6.003Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)bh6.004Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh6.00 dan Bingkai Alumunium Uk. 120 x 230 cm (J2)5Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh4.00 dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)6Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)bh1.007Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh1.00 dan Bingkai Alumunium Uk. 180 x 236 cm (J4)8Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh6.00 dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)9Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh1.00 dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2)

GPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag bh14.002Engsel Pintu 4 Inchi bh30.003Engsel Jendela 3 Inchi bh68.004Grendel Jendelabh24.005Hak Angin Jendelabh48.00(3x2)+(2x6)+(2x6)6Tarikan/Pegangan Jendelabh24.00(6x2x2)+(4x2x2)+(2x2)+(4x2)+(6x2)+(2x2)6+4+2+4+6+2HPEKERJAAN LANGIT-LANGIT1Pasang plafond gypsum tebal 9 mm m2236.202Frame rangka plafondm2236.203Pasang Cornice gypsumm'219.80

IPEKERJAAN INSTALASI LISTRIKI1Panel Listrik1Box panelUnit1.002MCBSet7.003Volt Meter & Selector switchUnit1.004Ampere Meter & Selector switchUnit1.005Grounding unit panelUnit1.006Kabel NYA 10 mm2m'80.007Wiring panel and accessoriesLs1.00I2Armature, saklar, dan Stop Kontak1Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitorbh15.002Lampu TL bulat 20 W dilengkapi kapasitorbh18.003Lampu TL Bulat 20 Wbh12.004Saklar double, setara brocobh6.005Stop Kontak, setara brocobh10.006Instalasi dengan kabel NYM 4 x 2,5 mmTtk45.007Testing and komisioningLs1.00

HPEKERJAAN PENGECATAN 1Cat Tembok 3 Lapis + diplamirm2289.072.00578.152Cat Plafond 3 lapis + diplamirm2236.20

IVPEKERJAAN LANTAI 2APEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Dinding Bata 1 : 4m2340.962Plesteran Dinding Bata 1 : 4m22.00681.923Plesteran 1 : 3 (Kolom dan Ringbalk)m221.062.0042.12

BPEKERJAAN BETON BERTULANG 1Kolom Beton 40/60 cm = 11 Kolom m39.502Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unitm32.743Kolom Praktis = 26 kolomm31.404Ring balok 15/20 cmm35.07

CPEKERJAAN BETON TAK BERTULANG 1Kolom Cor pada Bagian Belakang Gedungm31.082Beton Cor Pada Selasar Belakangm33.06

DPEKERJAAN LANTAI 1Pasangan Lantai Keramik 40 x 40 cm (Ruangan)m2263.422Pasangan Lantai Keramik 20 x 20 cm (Kamar Mandi)m28.80

EPEKERJAAN RANGKA ATAP 1Pasang Rangka Bajam2475.122Pasang Penutup atap genteng metal + insulation anti bocor daan panasm2475.123Pasang Rebung Genteng Metalm'40.804Pasang Lisplank GRCm'307.50

FPEKERJAAN LANGIT-LANGIT1Pasang plafond gypsum tebal 9 mm m2282.822Frame rangka plafondm2282.823Pasang Cornice gypsumm2225.884Plafond Calcyboardm231.10

GPEKERJAAN INSTALASI LISTRIKArmature, saklar, dan Stop Kontak1Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitorbh22.002Lampu TL bulat 20 W dilengkapi kapasitorbh12.003Lampu TL Bulat 20 Wbh5.004Saklar double, setara brocobh6.005Stop Kontak, setara brocobh10.006Instalasi dengan kabel NYM 4 x 2,5 mmTtk39.007Testing and komisioningLs1.00

HPEKERJAAN KOSEN PINTU DAN JENDELA KOSEN1Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood bh2.003 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)2Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM)bh3.003Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)bh2.004Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh30.00 dan Bingkai Alumunium Uk. 40 x 230 cm (J1)5Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh2.00 dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)6Kusen Jendela Alumunium 3" + Kaca polos 5 mm 225 x 290 cm (J3)bh1.007Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh2.00 dan Bingkai Alumunium Uk. 180 x 236 cm (J4)8Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm bh1.00 dan Bingkai Alumunium Uk. 180 x 352 cm (J6)

IPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag bh14.00(3x2)+(3x2)+(2x2)2Engsel Pintu 4 Inchi bh16.00(30x2)+(2x1x2)+(2x4x2)+(6x2)3Engsel Jendela 3 Inchi bh92.0030+2+4+64Grendel Jendelabh42.005Hak Angin Jendelabh84.006Tarikan/Pegangan Jendelabh42.00

JPEKERJAAN PENGECATAN 1Cat Tembok 3 Lapis + diplamirm2407.132.00814.272Cat Plafond 3 lapis + diplamirm2282.82

VPEKERJAAN INSTALASI PLUMBING1Instalasi Airbh20.002Kran Airbh8.003Kran Washtafelbh4.004Pemasangan Pengeriing air bak mandibh8.005Memasang floor drainbh8.006memasang tempat sabun keramikbh8.007memasang closet jongkokbh8.0022+2(4+2+1+0,6+0,6+1,8+1,8)+(1+0,5+0,5)47.68Memasang pipa air besih type AW dia. 1 " + Accessoriesm'95.209Memasang pipa buangan air kotor type AW dia. 3" + Accessoriesm'95.2022+4+4+2+23410Memasang pipa buangan air kotor type AW dia. 4" + Accessoriesm'68.0011Urinoirbh18.0012Bak Cuci Tangan / Washtafel keramikbh4.0013Shower8.00

VIPEKERJAAN SEPTICTANK1Pekerjaan Galian tanah m37.152Pekerjaan timbunan kembali lubang galianm30.251.793Cor Plat Lantai kerja 1 : 2 : 3m30.444Cor Beton Bertulang 1:2:3m30.595Pekerjaan Pasir Urugm30.236Pasangan Bata 1:2m26.097Plasteran 1 : 2m26.092.0012.188IjukKg50.009Pipa PVC 4"m'16.0010Kerikilm31.000.900.400.3611Pipa Hawabh1.00

Take Off PembesianLAMPIRAN C123

Tabel C.4.2 Quantity Take Off Gedung RKB SDN 89

No.Uraian PekerjaanDimensiJumlahVolumeUnitGambar SketpltL(1)(2)(3)(4)(5)(6)(7)I.PEKERJAAN PERSIAPAN1.Pembersihan Lapangan32.009.00288.000m2L = 32 m x 9 m = 288 m2

2.Pemasangan dan Pengukuran Bouwplank34.0011.002.0090.000m1P = 2 x ( 34,00 m + 11 m ) = 90,000 m1

II.PEKERJAAN TANAH1.Galian Tanah Pondasi- Galian pondasi menerus127.001.000.651.2090.805m3V = 127 m x [(( 1 m x 1,2 m )/2 ) x 0,65 m ] = 90,805 m3

- Galian pondasi tapak P11.701.700.9526.0071.383m3V = 1,7 m x 1,7 m x 0,95 m x 26 Unit = 71,383 m3

- Galian pondasi tapak P21.201.200.2510.003.600m3V = 1,2 m x 1,2 m x 0,25 m x 10 Unit = 3,6 m3

Total Volume galian pondasi tapak =74.983m32.Urugan kembali galian pondasi30.268m3- Urugan kembali galian pondasi menerusV = 1/3 x 90,805 m3 = 30,268 m3

23.794m3- Urugan kembali galian pondasi tapak P1V = 1/3 x 23,794 m3 = 23,794 m3

1.200m3- Urugan kembali galian pondasi tapak P2V = 1/3 x 1,2 m3 = 1,2 m3

Total Volume Urugan Kembali tanah pondasi=55.263m33.Urugan Tanah Bawah Lantai - Teras depan pintu luar / serambi depan (+ 0,40)32.002.000.6038.400m3V = 32 m x 2 m x 0,6 m = 38,4 m3

- Ruangan dalam (+ 0,40)32.009.000.65187.200m3V = 32 m x 9 m x 0,65 m = 187,2 m3

Total Volume Urugan Tanah Bawah Lantai =225.600m34.Urugan Pasir Bawah Lantai- Urugan pasir bawah lantai serambi muka32.002.000.053.200m3V = 32 m x 2 m x 0,05 m = 3,2 m3

- Urugan pasir bawah lantai ruangan dalam32.009.000.0514.400m3V = 32 m x 9 m x 0,05 m = 14,4 m3

Total Volume Urugan pasir Bawah Lantai =17.600m35.Urugan Pasir pondasi- Urugan pasir pondasi menerus127.000.800.055.080m3V = 127 m x 0,8 m x 0,05 m = 5,08 m3

- Urugan pasir pondasi tapak P11.701.700.1026.007.514m3V = 1,7 m x 1,7 m x 0,1 m x 26 Unit = 7,514 m3

- Urugan pasir pondasi tapak P21.201.200.0510.000.720m3V = 1,2 m x 1,2 m x 0,05 m x 10 Unit = 0,72 m3

Total Volume Urugan Pasir Pondasi =13.314m3

LAMPIRAN C124

III.PEKERJAAN PONDASI DAN PASANGAN BATU1.Lantai Kerja Cor 1 : 3 : 5- Lantai cor bawah lantai serambi muka32.002.000.053.200m3V = 32 m x 2 m x 0,05 m = 3,2 m3

- Lantai cor bawah lantai ruangan dalam32.009.000.0514.400m3V = 32 m x 9 m x 0,05 m = 14,4 m3

Total Volume Beton Cor Bawah Lantai =17.600m3

- Lantai cor bawah Pondasi tapak P11.701.700.1026.007.514m3V = 1,7 m x 1,7 m x 0,1 m = 7,514 m3

- Lantai cor bawah Pondasi tapak P21.201.200.0510.000.720m3V = 1,2 m x 1,2 m x 0,05 m = 0,72 m3

Total Volume Beton Cor Bawah pondasi tapak =8.234m32.Pondasi Batu Gunung127.000.800.800.3558.420m3V = 127 m x [(( 0,8 m x 0,35 m )/2 ) x 0,8 m ] = 58,42 m3

3.Pasangan Batu Kosong- Pasangan batu kosong pondasi batu gunung127.001.000.1012.700m3V = 127 m x 1 m x 0,1 m = 12,7 m3

IV.PEKERJAAN BETON BERTULANG1.Pondasi Tapak P1 150x1501.501.500.4026.0023.400m3V = 1,5 m x 1,5 m x 0,4 m x 26 Unit = 23,4 m3

2.Pondasi Tapak P2 100x1001.001.000.3010.003.000m3V = 1 m x 1 m x 0,3 m x 10 Unit = 3 m3

3.Sloof Beton 30/40127.000.300.4015.240m3V = 127 m x 0,3 m x 0,4 m = 15,24 m3

4.Sloof Beton 18/2535.000.180.251.575m3V = 35 m x 0,18 m x 0,25 m = 1,575 m3

5.Kolom Pondasi P2 25 / 25 Teras0.900.250.2510.000.563m3V = 0,9 m x 0,25 m x 0,25 m x 10 Unit = 0,562 m3

6.Kolom 25 / 25 Teras Lantai 13.250.250.2510.002.031m3V = 3,25 m x 0,25 m x 0,25 m x 10 Unit = 2,031 m3

7.Kolom 25 / 25 Teras Lantai 23.200.250.2510.002.000m3V = 3,2 m x 0,25 m x 0,25 m x 10 Unit = 2 m3

8.Kolom Pondasi 30 / 30 1.400.300.3026.003.276m3V = 1,4 m x 0,3 m x 0,3 m x 26 Unit = 3,276 m3

9.Kolom 30 / 30 Lantai 13.250.300.3026.007.605m3V = 3,25 m x 0,3 m x 0,3 m x 26 Unit = 7,605 m3

10.Kolom 30 / 30 Lantai 23.200.300.3026.007.488m3V = 3,2 m x 0,3 m x 0,3 m x 26 Unit = 7,488 m3

11.Balok Latai 13 / 15125.000.130.152.438m3V = 125 m x 0,13 m x 0,15 m = 2,437 m3

12.Ring Balok atap 20 / 30173.000.200.3010.380m3V = 173 m x 0,2 m x 0,3 m = 10,38 m3

13.Ring Balok 25/40 plat Lantai 2138.000.250.4013.800m3V = 138 m x 0,25 m x 0,4 m = 13,8 m3

14.Ring Balok 25/50 plat Lantai 228.000.250.503.500m3V = 28 m x 0,25 m x 0,5 m = 3,5 m3

15.Ring Balok 25/35 plat Lantai 2 beranda/balkon52.000.250.354.550m3V = 52 m x 0,25 m x 0,35 m = 4,55 m3

16.Top Geuvel 10 / 13D = 5,18 m x 0,1 m x 0,13 m x 4= 0,269 m35.180.100.134.000.269m3V = 2,66 m x 0,1 m x 0,13 m x 2 Unit = 0,069 m32.660.100.132.000.069m3Vtot = 0,269 m3 + 0,069m3 = 0,339 m30.339m3

17.plat Lantai 232.009.000.1028.800m3V = 32 m x 9 m x 0,1 m = 28,8 m3

LAMPIRAN C125

Tabel C.4.2 Quantity Take Off Gedung RKB SDN 89 ( lanjutan 3/5 )

V.PEKERJAAN PASANGAN DAN PLESTERAN1.Pasangan Bata 1 : 2- Pasangan bata rolag serambi muka32.000.6520.800m2

- Pasangan bata 1 : 2 Bangunan T = 4078.000.4031.200m2

2.Pasangan Bata 1 : 4- Luas kotor dinding 1 : 4 lantai 194.003.10291.400m2- Luas kotor dinding 1 : 4 Lantai 2101.003.50353.500m2- Luas bidang pintu D12.501.622.008.100m2- Luas bidang pintu D22.500.924.009.200m2- Luas bidang pintu D42.500.824.008.200m2- Luas bidang pintu jendela D,W32.022.251.004.265m2- Luas bidang jendela W11.581.9417.0052.108m2- Luas bidang jendela W21.581.3811.0023.984m2- Luas bidang jendela W31.580.722.002.275m2- Luas bidang Ventilasi0.550.603.000.990m2- Luas balok latai 13/15125.000.1518.750m2Luas bersih dinding 1 : 4 =548.227m23.Plesteran 1 : 220.802.0041.600m2

4.Plesteran 1 : 4548.232.001,096.454m2

5.Relief tiang teras2.002.000Bh

VI.PEKERJAAN ATAP DAN PLAFOND1.Rangka Atap Kuda - Kuda- Kuda - Kuda34.006.532.00444.040m2

2.Atap Seng Gelombang BJLS 30 cat pabrik- Atap Seng Gelombang BJLS 30 cat pabrik34.006.532.00444.040m2

3.Rabung Atap Seng Gelombang BJLS 30 cat pabrik34.0034.000m1

4.Listplank Kayu94.1294.120m1

5.Pasangan Plafond Plywood- Pladfond bagian dalam32.007.00224.000m2- Pladfond bagian samping kanan luar1.009.009.000m2- Pladfond bagian samping kiri luar1.009.009.000m2- Pladfond bagian teras depan32.002.0064.000m2- Pladfond teras belakang32.001.0032.000m3Volume Total Pladfond =338.000m27.List Profil 268.000m1

VII.PEKERJAAN LANTAI1.Pasangan Keramik Lantai 40 x 40 cm- ruangan lantai 1 L = 32 m x 7 m = 224 m232.007.00224.000m2- ruangan lantai 2 L = 32 m x 7 m = 224 m232.007.00224.000m2- Lantai teras lantai 1, L = 32 m x 2 m = 64 m232.002.0064.000m2- Lantai teras lantai 2, L = 32 m x 2 m = 64 m232.002.0064.000m2

Volume Total Keramik 40/40 =576.000m21.Speci ikatan keramik lantai 2 tebal = 3 cm- ruangan lantai 2 L = 32 m x 7 m = 6,72 m332.007.000.036.720m3- Lantai teras lantai 2, L = 32 m x 2 m = 1,92 m332.002.000.031.920m3

Volume Total speci8.640m24.Pasangan Bon-bon Keramik85.0085.000m1VIII.PEKERJAAN KUSEN, PINTU DAN JENDELA1.Volume Kusen Pintu, Jendela dan VentilasiTotal Volume Kusen3.146m3- Luas bidang pintu D18.200.060.132.000.128m3- Luas bidang pintu D26.800.060.134.000.212m3- Luas bidang pintu D46.600.060.134.000.206m3- Luas bidang pintu jendela D,W313.930.060.131.000.109m3- Luas bidang jendela W112.140.060.1317.001.610m3- Luas bidang jendela W28.880.060.1311.000.762m3- Luas bidang jendela W35.320.060.132.000.083m3- Luas bidang Ventilasi1.560.060.133.000.0372.Pintu Panel Tipe D12.002.000UnitLuas Pintu Panel D12.501.624.052.008.100m2

3.Pintu Panel Tipe D24.004.000UnitLuas Pintu Panel D22.500.922.304.009.200m2

4.Pintu Panel Tipe D44.004.000UnitLuas Pintu Panel D42.500.822.054.008.200m2

5.Pintu jendela D,W31.001.000UnitLuas Pintu jendela D,W32.022.254.531.004.534m2

6.Jendela Tipe W117.0017.000UnitLuas Jendela Panel W11.581.943.0717.0052.108m2

7.Jendela Tipe W211.0011.000UnitLuas Jendela Panel W21.581.382.1811.0023.984m2

8.Jendela Tipe W32.002.000UnitLuas Jendela Panel W31.580.721.142.002.275m2

9.Ventilasi3.003.000UnitLuas Ventilasi0.550.600.333.000.990m2

IX.PEKERJAAN PENGUNCI DAN PENGANTUNG1.Engsel Pintu26.0026.000buah

2.Kunci Pintu11.0011.000buah

3.Engsel Jendela154.00154.000buah

4.Hak Angin Jendela29.0029.000buah

5.Grendel/Pacok Pintu dan Jendela81.0081.000buah

X.PEKERJAAN PENGECATAN1.Cat Kayu Kusen63.430.060.1312.052m2

1.Cat Kayu Daun pintu dan jendela109.392.00218.784m2

2.Cat Dinding Tembok1,096.451,096.454m2

3.Cat Plafond338.00338.000m2

4.Cat Listplank Kayu94.120.3028.236m2

XI.PEKERJAAN ELEKTRIKAL DAN SANITASIA.PEKERJAAN ELEKTRIKAL1.Pemasangan Box Zakering1.001.000Unit

2.Pemasangan Lampu Down Ligth 23 Watt19.0019.000Unit

3.Pemasangan Lampu TL 20 Watt31.0031.000Unit

4.Pemasangan Stop Kontak7.007.000Unit

5.Pemasangan Saklar Tunggal12.0012.000Unit

6.Pemasangan Saklar Ganda9.009.000Unit

7.Pekerjaan Instalasi Listrik15.0015.000Ttk

LAMPIRAN C127

Tabel C.4.2 Quantity Take Off Gedung RKB SDN 89 ( lanjutan 5/5 )

XII.PEKERJAAN PEMBESIAN1.Pondasi Tapak 180x180 dan stik kolom 40/60 1.801.800.3013.0012.64m3Tulangan Pondasi tapak MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 1,8 m x 0,3 m ) x 23.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Besi14.40BuahJ = m / 0,125 m = 14,4 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi745.06m'P = 3,98 m'/Sngkng x 14,4 Buah = 745,056 m'W = 0,617 Kg/m' x 745,056 m' = 459,7 Kg459.700Kg36.38Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 1,8 m x 0,3 m ) x 23.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang14.40BuahJ = 1,8 m / 0,125 m = 14,4 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi745.06m'P = 3,98 m'/Sngkng x 14,4 Buah = 745,056 m'W = 0,617 Kg/m' x 745,056 m' = 459,7 Kg459.700Kg36.38Kg/m3

Stik Kolom 40/60 2.150.600.4013.006.71m3Jumlah Tulangan Utama dia. 20 mm18.00BtngUkuran Tulangan Utama20.00mmL = 2,15 m x 18 Btng x 13 Buah = 503,1 m'503.10m'W = 2,47 Kg/m' x 503,1 m' = 1242,657 Kg1,242.66KgBerat Tulangan Utama Permeter Kubik185.25Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,6 m x 0,4 m ) x 21.78m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah186.33BuahJ = 2,15 m / 0,15 m = 186,333 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang331.67m'P = 1,78 m'/Sngkng x 186,333 Buah = 331,673 m'W = 0,617 Kg/m' x 331,673 m' = 204,642 Kg204.642Kg30.51Kg/m3Total Berat Kebutuhan Besi2,366.70KgTotal Berat Tiap Kubik288.52Kg2.Pondasi Tapak 140x140 dan stik kolom 30/50 1.401.400.304.002.35m3Tulangan Pondasi tapak MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 1,4 m x 0,3 m ) x 23.18m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Besi11.20BuahJ = m / 0,125 m = 11,2 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi142.46m'P = 3,18 m'/Sngkng x 11,2 Buah = 142,464 m'W = 0,617 Kg/m' x 142,464 m' = 87,9 Kg87.900Kg37.37Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 1,4 m x 0,3 m ) x 23.18m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang11.20BuahJ = 1,4 m / 0,125 m = 11,2 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi142.46m'P = 3,18 m'/Sngkng x 11,2 Buah = 142,464 m'W = 0,617 Kg/m' x 142,464 m' = 87,9 Kg87.900Kg37.37Kg/m3

Stik Kolom 30/50 1.800.500.304.001.08m3Jumlah Tulangan Utama dia. 20 mm14.00BtngUkuran Tulangan Utama20.00mmL = 1,8 m x 14 Btng x 4 Buah = 100,8 m'100.80m'W = 2,47 Kg/m' x 100,8 m' = 248,976 Kg248.98KgBerat Tulangan Utama Permeter Kubik230.53Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,5 m x 0,3 m ) x 21.38m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah48.00BuahJ = 1,8 m / 0,15 m = 48 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang66.24m'P = 1,38 m'/Sngkng x 48 Buah = 66,24 m'W = 0,617 Kg/m' x 66,24 m' = 40,87 Kg40.870Kg37.84Kg/m3Total Berat Kebutuhan Besi465.65KgTotal Berat Tiap Kubik343.12Kg3.Pondasi Tapak dan stik kolom 30/50 Ramp Tangga1.501.180.451.000.80m3Tulangan Pondasi tapak MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 1,5 m x 0,45 m ) x 23.68m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi12.00BuahJ = m / 0,125 m = 12 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi44.16m'P = 3,68 m'/Sngkng x 12 Buah = 44,16 m'W = 0,617 Kg/m' x 44,16 m' = 27,247 Kg27.247Kg34.21Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 1,18 m x 0,45 m ) x 23.04m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang9.44BuahJ = 1,5 m / 0,125 m = 9,44 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi28.70m'P = 3,04 m'/Sngkng x 9,44 Buah = 28,698 m'W = 0,617 Kg/m' x 28,698 m' = 17,706 Kg17.706Kg22.23Kg/m3

Stik Kolom 1.501.250.301.000.56m3Tulangan Pondasi tapak MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 1,5 m x 0,3 m ) x 23.38m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi10.00BuahJ = m / 0,15 m = 10 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi33.80m'P = 3,38 m'/Sngkng x 10 Buah = 33,8 m'W = 0,617 Kg/m' x 33,8 m' = 20,855 Kg20.855Kg37.07Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 1,25 m x 0,3 m ) x 22.88m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah10.00BuahJ = 1,5 m / 0,15 m = 10 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang28.80m'P = 2,88 m'/Sngkng x 10 Buah = 28,8 m'W = 0,617 Kg/m' x 28,8 m' = 17,77 Kg17.770Kg31.59Kg/m3Total Berat Kebutuhan Besi62.72KgTotal Berat Tiap Kubik88.03Kg4.Sloof Beton 15/25 (Pondasi Menerus)119.900.150.254.50m3Jumlah Tulangan Utama dia. 14 mm6.00BtngUkuran Tulangan Utama14.00mmL = 119,9 m x 6 Btng = 719,4 m'719.40m'W = 1,21 Kg/m' x 719,4 m' = 870,474 Kg870.47KgBerat Tulangan Utama Permeter Kubik193.60Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,15 m + 0,25 m ) x 20.58m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sloof799.33BuahJ = 119,9 m / 0,15 m = 799,333 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang463.61m'P = 0,58 m'/Sngkng x 799,333 Buah = 463,613 m'W = 0,617 Kg/m' x 463,613 m' = 286,049 Kg286.049Kg63.62Kg/m3Total Berat Kebutuhan Besi1,156.52KgTotal Berat Tiap Kubik257.22Kg5.Sloof Beton 15/25 (Selasar Depan Dan Belakang )53.460.150.201.60m3Jumlah Tulangan Utama dia. 14 mm6.00BtngUkuran Tulangan Utama14.00mmL = 53,46 m x 6 Btng = 320,76 m'320.76m'W = 1,21 Kg/m' x 320,76 m' = 388,12 Kg388.12KgBerat Tulangan Utama Permeter Kubik242.00Kg/m3Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,15 m x 0,2 m ) x 20.48m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sengkang356.40BuahJ = 53,46 m / 0,15 m = 356,4 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang171.07m'P = 0,48 m'/Sngkng x 356,4 Buah = 171,072 m'W = 0,617 Kg/m' x 171,072 m' = 105,551 Kg105.551Kg65.81Kg/m3Total Berat Kebutuhan Besi493.67KgTotal Berat Tiap Kubik307.81Kg6.Kolom 40/60 ( Lantai 1 )3.600.600.4013.0011.23m3Jumlah Tulangan Utama dia. 20 mm18.00BtngUkuran Tulangan Utama20.00mmL = 3,6 m x 18 Btng x 13 Buah = 842,4 m'842.40m'W = 2,47 Kg/m' x 842,4 m' = 2080,728 Kg2,080.73KgBerat Tulangan Utama Permeter Kubik185.25Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,6 m x 0,4 m ) x 21.78m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah312.00BuahJ = 3,6 m / 0,15 m = 312 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang555.36m'P = 1,78 m'/Sngkng x 312 Buah = 555,36 m'W = 0,617 Kg/m' x 555,36 m' = 342,657 Kg342.657Kg30.51Kg/m3Total Berat Kebutuhan Besi2,423.39KgTotal Berat Tiap Kubik215.76Kg7.Kolom 30/50 (Lantai !)3.600.500.304.002.16m3Jumlah Tulangan Utama dia. 20 mm14.00BtngUkuran Tulangan Utama20.00mmL = 3,6 m x 14 Btng x 4 Buah = 201,6 m'201.60m'W = 2,47 Kg/m' x 201,6 m' = 497,952 Kg497.95KgBerat Tulangan Utama Permeter Kubik230.53Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,5 m x 0,3 m ) x 21.38m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah96.00BuahJ = 3,6 m / 0,15 m = 96 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang132.48m'P = 1,38 m'/Sngkng x 96 Buah = 132,48 m'W = 0,617 Kg/m' x 132,48 m' = 81,74 Kg81.740Kg37.84Kg/m3Total Berat Kebutuhan Besi579.69KgTotal Berat Tiap Kubik268.38Kg8.Kolom 40/60 ( Lantai 2 )3.600.600.4011.009.50m3Jumlah Tulangan Utama dia. 20 mm18.00BtngUkuran Tulangan Utama20.00mmL = 3,6 m x 18 Btng x 11 Buah = 712,8 m'712.80m'W = 2,47 Kg/m' x 712,8 m' = 1760,616 Kg1,760.62KgBerat Tulangan Utama Permeter Kubik185.25Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,6 m x 0,4 m ) x 21.78m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah264.00BuahJ = 3,6 m / 0,15 m = 264 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang469.92m'P = 1,78 m'/Sngkng x 264 Buah = 469,92 m'W = 0,617 Kg/m' x 469,92 m' = 289,941 Kg289.941Kg30.51Kg/m3Total Berat Kebutuhan Besi2,050.56KgTotal Berat Tiap Kubik215.76Kg9.Kolom 40/60 (Lantai 2)5.700.400.602.002.74m3Jumlah Tulangan Utama dia. 20 mm18.00BtngUkuran Tulangan Utama20.00mmL = 5,7 m x 18 Btng x 2 Buah = 205,2 m'205.20m'W = 2,47 Kg/m' x 205,2 m' = 506,844 Kg506.84KgBerat Tulangan Utama Permeter Kubik185.25Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,4 m x 0,6 m ) x 21.78m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah76.00BuahJ = 5,7 m / 0,15 m = 76 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang135.28m'P = 1,78 m'/Sngkng x 76 Buah = 135,28 m'W = 0,617 Kg/m' x 135,28 m' = 83,468 Kg83.468Kg30.51Kg/m3Total Berat Kebutuhan Besi590.31KgTotal Berat Tiap Kubik215.76Kg10.Balok Lantai 20 / 45116.500.200.4510.49m3Jumlah Tulangan Utama dia. 20 mm10.00BtngUkuran Tulangan Utama20.00mmL = 116,5 m x 10 Btng = 1165 m'1,165.00m'W = 2,47 Kg/m' x 1165 m' = 2877,55 Kg2,877.55KgBerat Tulangan Utama Permeter Kubik274.44Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.20mPanjang SengkangL = ( 0,2 m x 0,45 m ) x 21.08m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sengkang582.50BuahJ = 116,5 m / 0,2 m = 582,5 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang629.10m'P = 1,08 m'/Sngkng x 582,5 Buah = 629,1 m'W = 0,617 Kg/m' x 629,1 m' = 388,155 Kg388.155Kg37.02Kg/m3Total Berat Kebutuhan Besi3,265.70KgTotal Berat Tiap Kubik311.46Kg11.Balok Lantai 20/35115.100.200.358.06m3Jumlah Tulangan Utama dia. 20 mm7.00BtngUkuran Tulangan Utama20.00mmL = 115,1 m x 7 Btng = 805,7 m'805.70m'W = 2,47 Kg/m' x 805,7 m' = 1990,079 Kg1,990.08KgBerat Tulangan Utama Permeter Kubik247.00Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.20mPanjang SengkangL = ( 0,2 m x 0,35 m ) x 20.88m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sengkang575.50BuahJ = 115,1 m / 0,2 m = 575,5 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang506.44m'P = 0,88 m'/Sngkng x 575,5 Buah = 506,44 m'W = 0,617 Kg/m' x 506,44 m' = 312,473 Kg312.473Kg38.78Kg/m3Total Berat Kebutuhan Besi2,302.55KgTotal Berat Tiap Kubik285.78Kg9.Ring Balk 15/20168.890.150.205.07m3Jumlah Tulangan Utama dia. 14 mm5.00BtngUkuran Tulangan Utama14.00mmL = 168,89 m x 5 Btng = 844,45 m'844.45m'W = 1,21 Kg/m' x 844,45 m' = 1021,785 Kg1,021.78KgBerat Tulangan Utama Permeter Kubik201.67Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,15 m x 0,2 m ) x 20.48m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sengkang1,125.93BuahJ = 168,89 m / 0,15 m = 1125,933 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang540.45m'P = 0,48 m'/Sngkng x 1125,933 Buah = 540,448 m'W = 0,617 Kg/m' x 540,448 m' = 333,456 Kg333.456Kg65.81Kg/m3Total Berat Kebutuhan Besi1,355.24KgTotal Berat Tiap Kubik267.48Kg12.Kolom Praktis 15/153.600.150.1526.002.11m3Jumlah Tulangan Utama dia. 10 mm4.00BtngUkuran Tulangan Utama10.00mmL = 3,6 m x 4 Btng x 26 Buah = 374,4 m'374.40m'W = 0,617 Kg/m' x 374,4 m' = 231,005 Kg231.00KgBerat Tulangan Utama Permeter Kubik109.69Kg/m3

Tulangan SengkangUkuran Sengkang8.00mmJarak Rata-rata Antar Sengkang0.15mPanjang SengkangL = ( 0,15 m x 0,15 m ) x 20.38m'/SngkngJumlah Sengkang = (panjang kolom / Jarak Antar Sengkang) x Jumlah624.00BuahJ = 3,6 m / 0,15 m = 624 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang237.12m'P = 0,38 m'/Sngkng x 624 Buah = 237,12 m'W = 0,395 Kg/m' x 237,12 m' = 93,662 Kg93.662Kg44.47Kg/m3Total Berat Kebutuhan Besi324.67KgTotal Berat Tiap Kubik154.16Kg13.A. Plat Lantai 10 cm (Luas I)4.005.000.102.00m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 4 m x 0,1 m ) x 27.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi26.67BuahJ = m / 0,15 m = 26,667 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi212.80m'P = 7,98 m'/Sngkng x 26,667 Buah = 212,8 m'W = 0,617 Kg/m' x 212,8 m' = 131,298 Kg131.298Kg65.65Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 5 m x 0,1 m ) x 29.98m'/SngkngJumlah Besi Melintang = panjang Plat / Jarak Antar Besi Melintang33.33BuahJ = 4 m / 0,15 m = 33,333 BuahPanjang Total Besi = Panjang Besix Jumlah Besi332.67m'P = 9,98 m'/Sngkng x 33,333 Buah = 332,667 m'W = 0,617 Kg/m' x 332,667 m' = 205,255 Kg205.255Kg102.63Kg/m3

B Plat Lantai 10 cm (Luas II)6.005.000.103.00m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 6 m x 0,1 m ) x 211.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi40.00BuahJ = m / 0,15 m = 40 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi479.20m'P = 11,98 m'/Sngkng x 40 Buah = 479,2 m'W = 0,617 Kg/m' x 479,2 m' = 295,666 Kg295.666Kg98.56Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 5 m x 0,1 m ) x 29.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang33.33BuahJ = 6 m / 0,15 m = 33,333 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi332.67m'P = 9,98 m'/Sngkng x 33,333 Buah = 332,667 m'W = 0,617 Kg/m' x 332,667 m' = 205,255 Kg205.255Kg68.42Kg/m3

C Plat Lantai 10 cm (Luas III)3.004.700.101.41m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 3 m x 0,1 m ) x 25.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi20.00BuahJ = m / 0,15 m = 20 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi119.60m'P = 5,98 m'/Sngkng x 20 Buah = 119,6 m'W = 0,617 Kg/m' x 119,6 m' = 73,793 Kg73.793Kg52.34Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 4,7 m x 0,1 m ) x 29.38m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang31.33BuahJ = 3 m / 0,15 m = 31,333 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi293.91m'P = 9,38 m'/Sngkng x 31,333 Buah = 293,907 m'W = 0,617 Kg/m' x 293,907 m' = 181,34 Kg181.340Kg128.61Kg/m3

D Plat Lantai 10 cm (Luas IV)12.004.000.104.80m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 12 m x 0,1 m ) x 223.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi80.00BuahJ = m / 0,15 m = 80 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi1,918.40m'P = 23,98 m'/Sngkng x 80 Buah = 1918,4 m'W = 0,617 Kg/m' x 1918,4 m' = 1183,653 Kg1,183.653Kg246.59Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 4 m x 0,1 m ) x 27.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang26.67BuahJ = 12 m / 0,15 m = 26,667 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi212.80m'P = 7,98 m'/Sngkng x 26,667 Buah = 212,8 m'W = 0,617 Kg/m' x 212,8 m' = 131,298 Kg131.298Kg27.35Kg/m3

E. Plat Lantai 10 cm (Luas V)12.006.000.107.20m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 12 m x 0,1 m ) x 223.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi80.00BuahJ = 12 m / 0,15 m = 80 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi1,918.40m'P = 23,98 m'/Sngkng x 80 Buah = 1918,4 m'W = 0,617 Kg/m' x 1918,4 m' = 1183,653 Kg1,183.653Kg164.40Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 6 m x 0,1 m ) x 211.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang40.00BuahJ = 12 m / 0,15 m = 40 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi479.20m'P = 11,98 m'/Sngkng x 40 Buah = 479,2 m'W = 0,617 Kg/m' x 479,2 m' = 295,666 Kg295.666Kg41.06Kg/m3

F. Plat Lantai 10 cm (Luas VI)6.752.000.101.35m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 6,75 m x 0,1 m ) x 213.48m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi45.00BuahJ = m / 0,15 m = 45 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi606.60m'P = 13,48 m'/Sngkng x 45 Buah = 606,6 m'W = 0,617 Kg/m' x 606,6 m' = 374,272 Kg374.272Kg277.24Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 2 m x 0,1 m ) x 23.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang13.33BuahJ = 6,75 m / 0,15 m = 13,333 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi53.07m'P = 3,98 m'/Sngkng x 13,333 Buah = 53,067 m'W = 0,617 Kg/m' x 53,067 m' = 32,742 Kg32.742Kg24.25Kg/m3

G. Plat Lantai 10 cm (Luas VII)4.801.200.100.58m3Tulangan Plat Lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.150mPanjang BesiL = ( 4,8 m x 0,1 m ) x 29.58m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi32.00BuahJ = m / 0,15 m = 32 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi306.56m'P = 9,58 m'/Sngkng x 32 Buah = 306,56 m'W = 0,617 Kg/m' x 306,56 m' = 189,148 Kg189.148Kg328.38Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.150mPanjang Besi MelintangL = ( 1,2 m x 0,1 m ) x 22.38m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang8.00BuahJ = 4,8 m / 0,15 m = 8 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi19.04m'P = 2,38 m'/Sngkng x 8 Buah = 19,04 m'W = 0,617 Kg/m' x 19,04 m' = 11,748 Kg11.748Kg20.40Kg/m3

Total Berat Kebutuhan Besi4,494.79KgTotal Berat Tiap Kubik1,645.87Kg14.Plat Bordes tebal 10 cm1.503.000.100.45m3Tulangan Plat Bordes lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 1,5 m x 0,1 m ) x 22.98m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi12.00BuahJ = 1,5 m / 0,125 m = 12 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi35.76m'P = 2,98 m'/Sngkng x 12 Buah = 35,76 m'W = 0,617 Kg/m' x 35,76 m' = 22,064 Kg22.064Kg49.03Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 3 m x 0,1 m ) x 25.98m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang24.00BuahJ = 1,5 m / 0,125 m = 24 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi143.52m'P = 5,98 m'/Sngkng x 24 Buah = 143,52 m'W = 0,617 Kg/m' x 143,52 m' = 88,552 Kg88.552Kg196.78Kg/m3Total Berat Kebutuhan Besi110.62KgTotal Berat Tiap Kubik245.81Kg15.Plat Tanjakan tangga tebal 6 cm3.251.430.062.000.56m3Tulangan Plat Bordes lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 3,25 m x 0,06 m ) x 26.40m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi26.00BuahJ = m / 0,125 m = 26 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi166.40m'P = 6,4 m'/Sngkng x 26 Buah = 166,4 m'W = 0,617 Kg/m' x 166,4 m' = 102,669 Kg102.669Kg184.74Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 1,425 m x 0,06 m ) x 22.75m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang11.40BuahJ = 3,25 m / 0,125 m = 11,4 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi31.35m'P = 2,75 m'/Sngkng x 11,4 Buah = 31,35 m'W = 0,617 Kg/m' x 31,35 m' = 19,343 Kg19.343Kg34.81Kg/m3Total Berat Kebutuhan Besi122.01KgTotal Berat Tiap Kubik219.54Kg16.Pembesian Septic Tank tebal 10 cm3.300.900.102.000.59m3Tulangan Plat Bordes lantai MemanjangUkuran Besi10.00mmJarak Rata-rata Antar Besi0.125mPanjang BesiL = ( 3,3 m x 0,1 m ) x 23.18m'/SngkngJumlah Besi = panjang Plat / Jarak Antar Brsi26.40BuahJ = m / 0,125 m = 26,4 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi83.95m'P = 3,18 m'/Sngkng x 26,4 Buah = 83,952 m'W = 0,617 Kg/m' x 83,952 m' = 51,798 Kg51.798Kg87.20Kg/m3Tulangan Besi MelintangUkuran Besi Melintang10.00mmJarak Rata-rata Antar Besi Melintang0.125mPanjang Besi MelintangL = ( 0,9 m x 0,1 m ) x 20.78m'/SngkngJumlah Besi Melintang = panjang plat / Jarak Antar Besi Melintang7.20BuahJ = 3,3 m / 0,125 m = 7,2 BuahPanjang Total Besi = Panjang Besi x Jumlah Besi5.62m'P = 0,78 m'/Sngkng x 7,2 Buah = 5,616 m'W = 0,617 Kg/m' x 5,616 m' = 3,465 Kg3.465Kg5.83Kg/m3Total Berat Kebutuhan Besi55.26KgTotal Berat Tiap Kubik93.04Kg17.Ring Balok Lantai 15 / 20168.890.150.123.04m3Jumlah Tulangan Utama dia. 14 mm5.00BtngUkuran Tulangan Utama14.00mmL = 168,89 m x 5 Btng = 844,45 m'844.45m'W = 1,21 Kg/m' x 844,45 m' = 1021,785 Kg1,021.78KgBerat Tulangan Utama Permeter Kubik336.11Kg/m3

Tulangan SengkangUkuran Sengkang10.00mmJarak Rata-rata Antar Sengkang150.00mPanjang SengkangL = ( 0,15 m x 0,12 m ) x 20.32m'/SngkngJumlah Sengkang = panjang sloof / Jarak Antar Sengkang1.13BuahJ = 168,89 m / 150 m = 1,126 BuahPanjang Total Sengkang = Panjang Persengkang x Jumlah Sengkang0.36m'P = 0,32 m'/Sngkng x 1,126 Buah = 0,36 m'W = 0,617 Kg/m' x 0,36 m' = 0,222 Kg0.222Kg0.07Kg/m3Total Berat Kebutuhan Besi1,022.01KgTotal Berat Tiap Kubik336.18Kgs

REKAP

REKAPITULASI BIAYAGEDUNG REKTORAT UPTD PENDIDIKAN KESEHATAN ACEH

TOTAL NOURAIAN PEKERJAANJUMLAH(Rp)123.0

IPEKERJAAN PERSIAPANRp.27,458,000.00IIPEKERJAAN STRUKTUR BAWAH APEKERJAAN TANAH DAN PONDASIRp.129,278,322.47IIIPEKERJAAN LANTAI IAPEKERJAAN SELASAR DAN TRAP TANGGARp.20,162,251.19BPEKERJAAN PASANGAN DAN PLESTERAN Rp.58,718,105.52CPEKERJAAN BETON BERTULANG Rp.356,834,784.36DPEKERJAAN RAMP/TANJAKAN PLAT BETONRp.34,207,423.21EPEKERJAAN LANTAI Rp.58,217,469.83FPEKERJAAN KOSEN PINTU DAN JENDELA Rp.54,300,000.00GPEKERJAAN PENGUNCI DAN PENGGANTUNGRp.4,152,000.00HPEKERJAAN LANGIT-LANGIT Rp.16,871,688.80IPEKERJAAN INSTALASI LISTRIKRp.12,932,000.00JPEKERJAAN PENGECATAN Rp.13,740,714.83SUB TOTAL I +II+III Rp.786,872,760.21IVPEKERJAAN LANTAI 2APEKERJAAN PASANGAN DAN PLESTERAN Rp.60,461,456.56BPEKERJAAN BETON BERTULANG Rp.100,138,661.26CPEKERJAAN BETON TAK BERTULANGRp.3,084,552.54DPEKERJAAN LANTAI Rp.40,432,619.64FPEKERJAAN RANGKA ATAP Rp.185,907,344.00GPEKERJAAN LANGIT-LANGITRp.20,947,967.96HPEKERJAAN INSTALASI LISTRIKRp.7,510,000.001IPEKERJAAN KOSEN PINTU DAN JENDELA Rp.72,100,000.00JPEKERJAAN PENGUNCI DAN PENGGANTUNGRp.5,098,000.00IPEKERJAAN PENGECATAN Rp.18,617,394.37V PEKERJAAN INSTALASI PLUMBINGRp.22,438,000.00VIPEKERJAAN SEPTICTANKRp.6,290,326.64SUB TOTAL IV+V+VI Rp.543,026,322.96JUMLAH I + II + III + IV + V + VIRp.1,329,899,083.18PaguPPN 10 %Rp.132,989,908.32997,721,000.00-46.62TOTAL BIAYA Rp.1,462,888,991.50-465,167,000.00DIBULATKAN Rp.1,462,888,000.00Terbilang :Satu Milyar Empat Ratus Enam Puluh Dua Juta Delapan Ratus Delapan Puluh Delapan Ribu Rupiah

Mengetahui :

KEPALA SEKOLAH MIN MEUREDUE

Terjemahan kedalam kalimat

1,462,888,000.001satu dua tiga empat lima enam tujuh delapan sembilan sepuluh@ ribu juta milyar triliyun @001462888000@ @@@@@@ basic @0001@ perhitungan @0 @angka @sepuluh @ @0@ @0 @ @@ @@ @@ @@ @8882@ @8delapan puluh @luas bangunan 1263,500,000.00441,000,000.00 @delapan ratusdelapan belas @luas bangunan 1263,500,000.00441,000,000.00 @8delapan @selasar361,750,000.0063,000,000.00 @8delapan puluh delapan @selasar361,750,000.0063,000,000.00 @delapan puluh delapan delapan puluh delapan @1,008,000,000.00 @delapan ratus delapan puluh delapan ribu @ @@454,888,000.00 @@ @4623@ @4enam puluh @ @empat ratusdua belas @ @6dua @ @2enam puluh dua @ @enam puluh dua enam puluh dua @ @empat ratus enam puluh dua juta @ @@ @@ @0014@ @0 @ @sebelas @ @0satu @ @1 satu @ @satu satu @ @ satu milyar @ @@ @0001@ @0 @ @sepuluh @ @0@

@0 @ @@ @@ @*** @ @9100 @satu milyar empat ratus enam puluh dua juta delapan ratus delapan puluh delapan ribu rupiahsatu milyar empat ratus enam puluh dua juta delapan ratus delapan puluh delapan ribu rupiah @satu milyar empat ratus enam puluh dua juta delapan ratus delapan puluh delapan ribu rupiah @Satu milyar empat ratus enam puluh dua juta delapan ratus delapan puluh delapan ribu rupiah

RAB RENCANA ANGGARAN BIAYAGEDUNG REKTORAT UPTD PENDIDIKAN KESEHATAN ACEH

HARGA JUMLAHNO.URAIAN PEKERJAANVOLUMESTNANALISASATUANHARGA(Rp.)(Rp.)1234567IPEKERJAAN PERSIAPAN1Mobilisasi dan demobilisasi1.000LsTaksir2,500,000.002,500,000.002Admistrasi dan Dokumentasi4.000LsTaksir400,000.001,600,000.003Pembersihan Lapangan416.000m2Taksir3,000.001,248,000.00917,352,337.024Pasang Blowplank76.000m'Taksir15,000.001,140,000.005Air Kerja1,000.000LsTaksir2,500.002,500,000.0027,458,000.006Listrik Kerja4.000LsTaksir350,000.001,400,000.007P3k Sosial4.000LsTaksir60,000.00240,000.008Direksi Keet15.000m2Taksir450,000.006,750,000.009Barak Kerja24.000m2Taksir420,000.0010,080,000.00Sub Jumlah27,458,000.00IIPEKERJAAN STRUKTUR BAWAH APEKERJAAN TANAH DAN PONDASI1Pondasi Tapak Type P1 = 13 Unit- Galian Tanah Pondasi 117.936m3SNI-2835-2008-6.367,355.007,943,579.28- Urugan Kembali Bekas Galian 29.484m3SNI-2835-2008-6.915,542.00458,240.33- Urugan Pasir Alas Pondasi t = 5 cm 2.106m3SNI-2835-2008-6.11132,650.00279,360.90- Lantai Kerja Plat Beton 180 x 180 cm 4.212m3SNI-7394-2008-6.4542,099.002,283,320.99- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm 16.536m3SNI-7394-2008-A5,008,957.0082,828,112.95dari Pondasi Tapak ke sloof 2Pondasi Tapak Type P2 = 4 Unit- Galian Tanah Pondasi 18.816m3SNI-2835-2008-6.367,355.001,267,351.68- Urugan Kembali Bekas Galian 4.704m3SNI-2835-2008-6.915,542.0073,109.57- Urugan Pasir Alas Pondasi t = 5 cm 0.392m3SNI-2835-2008-6.11132,650.0051,998.80- Lantai Kerja Plat Beton 140 x 140 cm 0.784m3SNI-7394-2008-6.4542,099.00425,005.62- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm 2.909m3SNI-7394-2008-A6,581,626.0019,148,143.91dari Pondasi Tapak ke sloof 3Pondasi Menerus (sloof 15/25 cm)- Galian Tanah Pondasi Menerus106.164m3SNI-2835-2008-6.146,625.004,949,896.50- Urugan Kembali Bekas Galian 26.541m3SNI-2835-2008-6.915,541.67412,491.38- Urugan Pasir Alas Pondasi t = 5 cm 19.660m3SNI-2835-2008-6.11132,650.002,607,899.00- Lantai Kerja Plat Beton 60 x 60 cm 5.898m3SNI-7394-2008-6.4542,099.003,197,299.90- Pasangan Batu Gunung 1 : 4 35.388m3SNI-2836-2008-6.3568,415.003,352,511.67Sub Jumlah129,278,322.47IIIPEKERJAAN LANTAI IAPEKERJAAN SELASAR DAN TRAP TANGGAPekerjaan Selasar Depan dan Belakang 1Galian Tanah Pondasi Menerus45.857m3SNI-2835-2008-6.146,625.002,138,073.302Urugan Kembali Bekas Galian 11.464m3SNI-2835-2008-6.915,541.67178,172.783Urugan Pasir Alas Pondasi t = 5 cm 2.123m3SNI-2835-2008-6.11132,650.00281,615.954Lantai Kerja Plat Beton 2.548m3SNI-7394-2008-6.4542,099.001,381,051.415Pasangan Batu Gunung 1 : 4 15.286m3SNI-2836-2008-6.3568,415.008,688,564.326Pasangan Trasram Bata 1 : 2 9.692m2SNI-6897-2008-6.793,151.00902,819.497Plesteran 1 : 219.384m2SNI-2837-2008-6.246,134.00894,261.46Pekerjaan Trap Tangga Pada Selasar 2 Unit129,278,322.471Galian Tanah 1.080m3SNI-2835-2008-6.146,625.0050,355.002Urugan Kembali Bekas Galian 0.270m3SNI-2835-2008-6.915,541.674,196.253Urugan Pasir Alas Pondasi t = 5 cm 6.088m3SNI-2835-2008-6.11132,650.00807,573.204Lantai Kerja Plat Beton 60 x 60 cm 6.088m3SNI-7394-2008-6.4542,099.003,300,298.715Pasangan Trasram Bata 1 : 28.280m2SNI-6897-2008-6.793,151.00771,290.286Plesteran 1 : 216.560m2SNI-2837-2008-6.246,134.00763,979.04Sub Jumlah20,162,251.19BPEKERJAAN PASANGAN DAN PLESTERAN 1Pasangan Trasram Bata 1 : 2 dibawah Lantai 59.950m2SNI-6897-2008-6.793,151.005,584,402.452Plesteran Trasram Bata 1 : 2 dibawah Lantai 119.900m2SNI-2837-2008-6.246,134.005,531,466.603Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm 54.368m2SNI-6897-2008-6.793,151.005,064,386.994Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm 108.735m2SNI-2837-2008-6.246,134.005,016,380.495Pasangan Dinding Bata 1 : 4194.792m2SNI-6897-2008-6.984,821.0016,522,426.796Plesteran Dinding Bata 1 : 4389.583m2SNI-2837-2008-6.441,841.0016,300,559.047Dinding Keramik 30x60 kamar mandi16.605m2SNI-7395-2008-6.34a149,609.002,484,257.458Plesteran 1 : 3 (Kolom dan Balok)52.920m2SNI-2837-2008-6.341,841.002,214,225.72

Sub Jumlah58,718,105.5220,162,251.19CPEKERJAAN BETON BERTULANG 1Sloof Beton 15/25 cm (Pondasi Menerus) 3.597m3SNI-7394-2008-C4,679,742.0016,833,031.972Sloof Beton 15/25 cm (Selasar Depan,belakang) 2.005m3SNI-7394-2008-D5,302,400.0010,629,986.403Kolom Beton 40/60 cm = 13 Kolom 11.232m3SNI-7394-2008-E4,622,725.0051,922,447.204Kolom Beton 30/50 cm = 4 Kolom 2.160m3SNI-7394-2008-F5,270,304.0011,383,856.645Kolom Praktis1.377m3SNI-7394-2008-G3,864,685.005,321,671.256Balok Lantai 20/45 cm 10.485m3SNI-7394-2008-H7,221,478.0075,717,196.837Balok Lantai 20/35 cm 8.057m3SNI-7394-2008-I6,680,161.0053,822,057.188Plat Lantai T = 10 cm 20.336m3SNI-7394-2008-J6,451,836.00131,204,536.90

58,718,105.52 Sub Jumlah356,834,784.36DPEKERJAAN RAMP/TANJAKAN PLAT BETON1Galian Tanah 4.662m3SNI-2835-2008-6.367,355.00314,009.012Urugan Kembali Bekas Galian 1.166m3SNI-2835-2008-6.922,451.6726,167.423Urugan Pasir Alas Pondasi t = 5 cm 0.111m3SNI-2835-2008-6.11132,650.0014,724.154Lantai Kerja Plat Beton 150 x 150 cm 0.219m3SNI-7394-2008-6.4542,099.00118,741.365Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof 1.315m3SNI-7394-2008-K2,772,586.003,645,257.446Bordes0.450m3SNI-7394-2008-L5,829,878.002,623,445.107Anak Tangga0.824m3SNI-7394-2008-6.8745,061.00614,253.438Plat Lantai Tebal 6 cm 0.556m3SNI-7394-2008-M5,437,637.003,021,966.769Realling Besi Hollow 45.000m'Taksir500,000.0022,500,000.0010Keramik + Spesi8.978m2SNI-7395-2008-6.36148,021.001,328,858.53356,834,784.36 Sub Jumlah34,207,423.21

EPEKERJAAN LANTAI Ruangan 1Timbunan Tanah Bawah Lantai T = 60 cm 64.700m3SNI-2835 : 2008. 6.1087,250.005,645,031.382Timbunan Pasir Bawah Lantai T = 10 cm 10.790m3SNI-2835-2008-6.11132,650.001,431,293.503Beton Tumbuk Dibawah Lantai Keramik = 5 cm 5.395m3SNI-7394-2008-6.4a542,099.002,924,624.114Lantai Keramik 40 x 40 cm (Polished)98.300m2SNI-7395-2008-6.34148,549.0014,602,366.705Lantai Keramik 20 x 20 cm (Polished) kamar mandi14.100m2SNI-7395-2008-6.36148,021.002,087,096.10Selasar 1Timbunan Tanah Bawah Lantai T = 60 cm 70.560m3SNI-2835 : 2008. 6.1087,250.006,156,360.002Timbunan Pasir Bawah Lantai T = 10 cm 11.760m3SNI-2835-2008-6.11132,650.001,559,964.003Beton Tumbuk Dibawah Lantai Keramik = 5 cm 5.880m3SNI-7394-2008-6.4a542,099.003,187,542.124Lantai Keramik 40 x 40 cm (polished)113.100m2SNI-7395-2008-6.34148,549.0016,800,891.90Rollag Tangga1Timbunan Tanah Bawah Lantai T = 60 cm 10.200m3SNI-2835 : 2008. 6.1087,250.00889,950.002Timbunan Pasir T = 10 cm 1.700m3SNI-2835-2008-6.11132,650.00225,505.003Beton Tumbuk Dibawah Lantai Keramik = 5 cm 0.850m3SNI-7394-2008-6.4a542,099.00460,784.154Lantai Keramik 40 x 40 cm (Polished)15.120m2SNI-7395-2008-6.34148,549.002,246,060.88 Sub Jumlah58,217,469.83FPEKERJAAN KOSEN PINTU DAN JENDELA 1Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood 2.000BhTaksir3,000,000.006,000,000.003 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)2Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )6.000BhTaksir800,000.004,800,000.003Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)6.000BhTaksir2,000,000.0012,000,000.004Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm 6.000BhTaksir2,600,000.0015,600,000.00 dan Bingkai Alumunium Uk. 120 x 230 cm (J2)5Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm 4.000BhTaksir1,500,000.006,000,000.00 dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)6Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)1.000BhTaksir2,500,000.002,500,000.007Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm 1.000BhTaksir5,200,000.005,200,000.00 dan Bingkai Alumunium Uk. 180 x 236 cm (J4)58,217,469.838Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm 6.000BhTaksir300,000.001,800,000.00 dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)9Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm 1.000BhTaksir400,000.00400,000.00 dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2) Sub Jumlah54,300,000.00GPEKERJAAN PENGUNCI DAN PENGGANTUNG1Kunci Tanam 2 Slaag 14.000BhTaksir120,000.001,680,000.002Engsel Pintu 4 Inchi 30.000BhTaksir16,000.00480,000.003Engsel Jendela 3 Inchi 68.000BhTaksir12,000.00816,000.004Grendel Jendela24.000BhTaksir11,000.00264,000.005Hak Angin Jendela48.000BhTaksir12,000.00576,000.006Tarikan/Pegangan Jendela24.000BhTaksir14,000.00336,000.0054,300,000.00 Sub Jumlah4,152,000.00HPEKERJAAN LANGIT-LANGIT1Pasang plafond gypsum tebal 9 mm 236.200m2SNI-2839-2008-6.735,999.008,502,963.802Frame rangka plafond236.200m2Anl. Taksir (a)26,125.006,170,725.003Pasang Cornice gypsum219.800m'Taksir10,000.002,198,000.00 Sub Jumlah16,871,688.80IPEKERJAAN INSTALASI LISTRIKI1Panel Listrik1Box panel1.000UnitTaksir230,000.00230,000.004,152,000.002MCB7.000SetTaksir46,000.00322,000.003Volt Meter & Selector switch1.000UnitTaksir100,000.00100,000.004Ampere Meter & Selector switch1.000UnitTaksir1,900,000.001,900,000.005Grounding unit panel1.000UnitTaksir150,000.00150,000.006Kabel NYA 10 mm280.000m'Taksir21,500.001,720,000.007Wiring panel and accessories1.000LsTaksir400,000.00400,000.00ERROR:#REF!Armature, saklar, dan Stop Kontak1Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor15.000bhTaksir70,000.001,050,000.002Lampu TL bulat 20 W dilengkapi kapasitor18.000bhTaksir45,000.00810,000.003Lampu TL Bulat 20 W12.000bhTaksir40,000.00480,000.004Saklar double, setara broco6.000bhTaksir20,000.00120,000.005Stop Kontak, setara broco10.000bhTaksir120,000.001,200,