Page 1 HARGA SATUAN BAHAN MATERIAL, BAHAN MATERIAL TERPASANG UPAH TENAGA KERJA, UPAH TENAGA AHLI BERPENDIDIKAN S1/S2/S3 TAHUN ANGGARAN 2015 A. BAHAN MATERIAL / BAHAN MATERIAL TERPASANG NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN A. MATERIAL ALAM, BATU BATA 1 Pasir Urug 98,650.00 2 Tanah Urug 74,850.00 3 Pasir Pasang 221,200.00 3 Pasir Beton ex: Bengawan Solo 260,800.00 4 Pasir Beton ex: Brantas 276,450.00 5 Abu batu 162,700.00 6 Batu kali 162,700.00 7 Batu Belah 15/20 (Batu Quarry) 170,800.00 8 G r e v e l 286,900.00 9 Batu Pecah 5 - 7 cm 201,700.00 10 Batu Pecah 3 - 5 cm 224,500.00 11 Batu Pecah 2 - 3 cm (Mesin) 284,650.00 12 Batu Pecah 1 - 2 cm (Mesin) 292,750.00 13 Batu Pecah ½ - 1 cm (Mesin) 307,050.00 14 Sirtu 152,250.00 15 Bahan Agregat Base Kelas A 208,200.00 16 Bahan Agregat Base Kelas B 195,150.00 17 Bahan Agregat Base Kelas C 120,000.00 18 Agregat Kasar 227,700.00 19 Agregat Halus 247,200.00 20 Chipping ( kg ) 300.00 Kg 21 Batu Bata 1,000.00 Bj 22 Rooster Kerawangan 11 x 12 x 24 7,200.00 Bh 23 Rooster Kerawangan 11 x 22 x 22 5,900.00 Bh 24 Rooster Beton 11 x 20 x 20 10,450.00 Bh 25 Batu tempel kasar/marmo (hitam dan kuning) 149,650.00 26 Batu tempel halus (candi/hitam dan palimanan) 165,900.00 27 Batu sirih/alur (hitam dan kuning) 192,200.00 28 Batu alur andesit hitam 276,450.00 29 Batu muka/batu poros 29,100.00 30 List batu andesit p = 40 cm, lebar = 5 cm 200,500.00 m' 31 List batu candi p = 40 cm, lebar = 5 cm 131,350.00 m' 32 B a t a k o 10 x 20 x 40 cm 7,000.00 Bj 33 Glass Blok Kaca 20 x 20 cm 26,050.00 Bj 34 Beton cetak bergaris 89,950.00 35 Rumput lamur 5,600.00 36 Gebalan rumput 4,600.00 37 kapur pasang 246,100.00 B. S E M E N 1 Portland Cement : a. PC Gresik 50 kg 1,850.00 Kg b. PC Tiga Roda 50 kg 1,750.00 Kg c. PC Holcim 50 kg 1,400.00 Kg d. Filler (semen) 1,350.00 Kg 2 Semen Nat Warna 14,350.00 Kg 3 Semen Putih 2,125.00 Kg 4 Semen Merah 235,100.00 5 K a p u r 246,100.00 C. BESI / BAJA / MESH 1 Besi Beton Polos 11,500.00 Kg 2 Besi Beton Ulir 13,700.00 Kg

description

contoh perhitungan rab rumah

Transcript of RAB rumah

Page 1: RAB rumah

Page 1

HARGA SATUAN

BAHAN MATERIAL, BAHAN MATERIAL TERPASANG

UPAH TENAGA KERJA, UPAH TENAGA AHLI BERPENDIDIKAN S1/S2/S3

TAHUN ANGGARAN 2015

A. BAHAN MATERIAL / BAHAN MATERIAL TERPASANG

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

A. MATERIAL ALAM, BATU BATA

1 Pasir Urug 98,650.00 m³2 Tanah Urug 74,850.00 m³3 Pasir Pasang 221,200.00 m³3 Pasir Beton ex: Bengawan Solo 260,800.00 m³4 Pasir Beton ex: Brantas 276,450.00 m³5 Abu batu 162,700.00 m³6 Batu kali 162,700.00 m³7 Batu Belah 15/20 (Batu Quarry) 170,800.00 m³8 G r e v e l 286,900.00 m³9 Batu Pecah 5 - 7 cm 201,700.00 m³10 Batu Pecah 3 - 5 cm 224,500.00 m³11 Batu Pecah 2 - 3 cm (Mesin) 284,650.00 m³12 Batu Pecah 1 - 2 cm (Mesin) 292,750.00 m³13 Batu Pecah ½ - 1 cm (Mesin) 307,050.00 m³14 Sirtu 152,250.00 m³15 Bahan Agregat Base Kelas A 208,200.00 m³16 Bahan Agregat Base Kelas B 195,150.00 m³17 Bahan Agregat Base Kelas C 120,000.00 m³18 Agregat Kasar 227,700.00 m³19 Agregat Halus 247,200.00 m³20 Chipping ( kg ) 300.00 Kg21 Batu Bata 1,000.00 Bj22 Rooster Kerawangan 11 x 12 x 24 7,200.00 Bh23 Rooster Kerawangan 11 x 22 x 22 5,900.00 Bh24 Rooster Beton 11 x 20 x 20 10,450.00 Bh25 Batu tempel kasar/marmo (hitam dan kuning) 149,650.00 m²26 Batu tempel halus (candi/hitam dan palimanan) 165,900.00 m²27 Batu sirih/alur (hitam dan kuning) 192,200.00 m²28 Batu alur andesit hitam 276,450.00 m²29 Batu muka/batu poros 29,100.00 m²30 List batu andesit p = 40 cm, lebar = 5 cm 200,500.00 m'31 List batu candi p = 40 cm, lebar = 5 cm 131,350.00 m'32 B a t a k o 10 x 20 x 40 cm 7,000.00 Bj33 Glass Blok Kaca 20 x 20 cm 26,050.00 Bj34 Beton cetak bergaris 89,950.00 m²35 Rumput lamur 5,600.00 m²36 Gebalan rumput 4,600.00 m²37 kapur pasang 246,100.00 m³

B. S E M E N

1 Portland Cement : a. PC Gresik 50 kg 1,850.00 Kg b. PC Tiga Roda 50 kg 1,750.00 Kg c. PC Holcim 50 kg 1,400.00 Kg d. Filler (semen) 1,350.00 Kg

2 Semen Nat Warna 14,350.00 Kg3 Semen Putih 2,125.00 Kg4 Semen Merah 235,100.00 m³5 K a p u r 246,100.00 m³

C. BESI / BAJA / MESH

1 Besi Beton Polos 11,500.00 Kg2 Besi Beton Ulir 13,700.00 Kg3 Besi Profil WF 15,650.00 Kg

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 2: RAB rumah

Page 2

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

4 Besi Profil C 13,050.00 Kg5 Besi Profil Siku 13,700.00 Kg6 Besi Plat Strip 17,000.00 Kg7 Kawat / Tali Beton 10,500.00 Kg8 Kawat anyaman 28,550.00 Kg8 Kawat Harmonika 28,550.00 m²9 Kawat duri 7,000.00 m'10 Kawat ayam (ayakan) 21,550.00 m²11 Paku biasa 13,000.00 Kg12 Paku anti karat 25,400.00 Kg13 Paku kalsiboard 28,000.00 Kg14 Paku Keling 1,350.00 Bh15 Skrup Asbes / paku pancing 2,000.00 Bh16 Skrup/Kayu Besi 700.00 Bj17 Dinalbot 4,600.00 Bh18 Alat Bantu 118,750.00 Set19 Wire mesh 11,750.00 Kg20 Pagar baja ( BRC ) 240 x 120 374,750.00 m²21 Pagar baja ( BRC ) 240 x 150 431,300.00 m²

D. K A Y U

1 Kayu Bakar 242,400.00 m³2 Kayu Meranti 5,042,150.00 m³3 Kayu Kruing 7,572,350.00 m³4 Kayu Kamper 9,168,050.00 m³5 Kayu Jati Papan 28,234,850.00 m³6 Kayu Jati Usuk 8,765,000.00 m³7 Kayu Jati Reng 6,711,900.00 m³

Kayu Jati Lokal :

8 a. Kayu Jati Balok ( A1 ) 14,520,800.00 m³9 b. Kayu Jati Balok ( A2 ) 20,167,800.00 m³10 c. Kayu Jati Balok ( A3 ) 24,884,050.00 m³

Kayu Jati Perhutani :

11 a. Kayu Jati Balok ( A1 ) 20,167,800.00 m³12 b. Kayu Jati Balok ( A2 ) 24,201,350.00 m³13 c. Kayu Jati Balok ( A3 ) 36,974,550.00 m³14 Kayu Stoot 24,100.00 Btg15 B a m b u 21,550.00 Btg16 Tali ijuk 20,300.00 Kg17 Kayu Perancah 3,361,650.00 m³18 Kayu kelapa / glugu 3,630,600.00 m³19 Kayu jawa 3,697,600.00 m³20 Bambu anyam ( Gedeg ) 25,350.00 m²

E. PENUTUP ATAP

1 Genting Glazur 12,700.00 Bj2 Genting Bubungan Glazur 26,000.00 Bj3 Akhiran Genting Glazur 40,550.00 Bj4 Nok Glazur 2 Arah 67,750.00 Bj5 Nok Glazur 3 Arah 100,050.00 Bj6 Nok Glazur 4 Arah 229,100.00 Bj7 Genting Lokal 2,200.00 Bj8 Genting Bubungan Lokal 8,300.00 Bj9 Genting Kodokan (Gandusari) 2,550.00 Bj10 Genting Bubungan (Gandusari) 8,300.00 Bj11 Genting Kodokan KW I (Karangpilang) 5,500.00 Bj12 Genting Bubungan (Karangpilang) 20,900.00 Bj13 Genting Mantili 3,200.00 Bj14 Genting Bubungan Mantili 8,950.00 Bj15 Genting Beton Natural 12,700.00 Bj16 Genting Beton Finish Cat 14,600.00 Bj17 Genting Bubungan Beton 20,300.00 Bj18 Genting Kaca 27,250.00 Bj

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 3: RAB rumah

Page 3

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

19 Genting Metal ex. Multi Roof 0,77 m x 1,00 m 246,800.00 Bh20 Genting Metal ex. Surya Roof 0,77 m x 0,80 m 113,900.00 Bh21 Genting Metal pasir ex. kencana Roof 0,80 m x 0,80 m 49,450.00 Bh21 Nok Stel Metal 90 cm 67,750.00 Lbr22 Atap Sirap Kayu Ulin T = 4 mm, P = 58 cm, L = 8 cm 3,200.00 Bh23 Atap Zincalume T = 0,30 mm 47,500.00 m²24 Atap Zincalume T = 0,35 mm 74,700.00 m²25 Atap Zincalume T = 0,40 mm 85,450.00 m²26 Atap Zincalume T = 0,45 mm 96,200.00 m²27 Atap Zincalume T = 0,50 mm 106,350.00 m²28 Seng Gelombang BJLS 30 ( 0,80 x 3,00 ) m 123,400.00 Lbr29 Seng Gelombang BJLS 20 ( 0,80 x 1,80 ) m 68,400.00 Lbr30 Bondex T = 0,75 mm, L = 1,00 m 131,700.00 m²31 Bondex T = 0,65 mm, L = 1,00 m 121,550.00 m²31 Asbes Gelombang 0,35 x 180 x 80 64,150.00 Lbr32 Asbes Gelombang 0,35 x 240 x 80 86,200.00 Lbr33 Asbes Gelombang 0,40 x 210 x 103 93,850.00 Lbr34 Asbes Gelombang 0,40 x 300 x 103 113,150.00 Lbr35 Asbes Gelombang besar 0,50 x 200 x 105 112,050.00 Lbr36 Asbes Gelombang besar 0,50 x 300 x 105 141,800.00 Lbr37 Nok Stel Asbes Gelombang 41,150.00 Bh38 Fiber Glass Gelombang 0,80 x 3,00 m 123,400.00 Lbr39 Seng Talang 0,90 M ( BJLS 0,30) 46,900.00 m'40 Seng Talang 0,60 M ( BJLS 0,30) 29,150.00 m'41 Talang Karpet 0,90 M 20,300.00 m'42 Talang PVC U ( 4 m' ) 104,450.00 Lj 43 Aluminium foil single skie 10,800.00 m²44 Aluminium foil double skie 13,950.00 m²

F. PENUTUP LANGIT-LANGIT

1 Fiber semen rata ex Gresik Superata Exl 22,200.00 Lbr (1,00 X 1,00) t = 3 mm

2 Kalsiboard 1,00 x 1,00 m ex Gresik 19,700.00 Lbr3 Kalsiboard 1,20 x 2,40 m ex Gresik 66,500.00 Lbr4 Gypsum board 1,20 x 2,40 m ex Jayaboard 83,550.00 Lbr5 List kayu jati profil 30,450.00 m'6 List kayu pelipit meranti 8,300.00 m'7 Papan GRC t = 9 mm lebar = 20 cm 24,700.00 m'8 Papan GRC t = 9 mm lebar = 30 cm 29,800.00 m'

G. KAYU LAPIS

1 Multipleks t = 9 mm (1,20 x 2,40 ) m 126,000.00 Lbr2 Multipleks t = 12 mm (1,20 x 2,40 ) m 171,500.00 Lbr3 Tripleks 3 mm ( 2,40 x 1,20 ) m 47,500.00 Lbr4 Teaxwood t = 4 mm ( 2,40 x 1,20 ) m 102,500.00 Lbr5 Plywood Besar t = 4 mm ( 2,40 x 1,20 ) m 88,000.00 Lbr

H. K A C A

1 Kaca Bening 5 mm 120,300.00 m²2 Kaca Bening 3 mm 110,300.00 m²3 Kaca Rayband 5 mm 113,900.00 m²4 Kaca Rayband 3 mm 94,950.00 m²5 Kaca Es 5 mm 189,850.00 m²6 Kaca Es 3 mm 126,600.00 m²7 Kaca Tempered 8 mm 405,000.00 m²8 Kaca Tempered 10 mm 607,450.00 m²9 Kaca Tempered 12 mm 809,900.00 m²

I. PENGGANTUNG, PENGUNCI

1 Engsel Jendela nylon 22,800.00 Bh2 Engsel Pintu 32,550.00 Bh3 Kait / hak angin kuningan 45,600.00 Ps

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
H157
T K T B: Astrisco
I157
T K T B: Astrisco
Page 4: RAB rumah

Page 4

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

4 Grendel pintu kuningan 3" 17,000.00 Bh5 Grendel jendela kuningan 17,600.00 Bh6 Grendel tanam 70,950.00 Bh7 Handle pintu 201,050.00 Bh8 Handle jendela 17,600.00 Bh9 Kerangka Nako 121,000.00 m²10 Kunci Tanam setara " Yale " 186,750.00 Set11 Kunci Tanam setara " Beluci " 207,500.00 Set12 Sealant 41,700.00 Klg13 Rel pintu geser + acc 357,150.00 Unit14 Door closer 195,850.00 Unit15 Floorhang 864,500.00 Set

J. CAT MARKA JALAN

1 Cat Thermoplastic 31,650.00 Kg2 Cat Non Thermoplastic 25,350.00 Kg3 Glassbed Pottes 22,800.00 Kg

K. CAT KAYU / BESI / TEMBOK / GENTING

1 Cat Dempul / Plamir 34,200.00 Kg2 Cat Meni 30,450.00 Kg3 Cat Dasar Minyak 38,050.00 Kg4 Cat Water Proofing 58,250.00 Kg5 Coating batu alam 82,300.00 Kg6 Cat Kayu Halus :

a. Emco kg 67,100.00 Kaleng b. Altek kg 57,000.00 Kaleng

7 Lem Kayu 13,350.00 Ltr8 Meni Besi (Flincote) Kg 28,550.00 Kaleng9 Thinner / Minyak Cat :

a. Thinner A Biasa 1Kg 27,900.00 Kaleng b. Thinner A Spesial 1Kg 32,950.00 Kaleng c. Thinner B 1Kg 16,500.00 Kaleng

10 Cat Tembok :

a. Decolith 5 Kg 117,250.00 Kaleng b. Paragon 5 Kg 107,600.00 Kaleng c. Catylac 5 Kg 131,050.00 Kaleng d. Aries 5 Kg 63,450.00 Kalenge. Dullux exterior 2,50 Ltr 347,550.00 Kalengf. Dullux dasar exterior 2,50 Ltr 200,000.00 Kalengg Dana paint exterior 2,50 Ltr 257,900.00 Kaleng

11 Cat Genting :

a. Multishield standar 5 Kg 170,900.00 Kaleng b. Multishield khusus 5 Kg 168,000.00 Kaleng c. Sanlex standar 5 Kg 170,900.00 Kaleng d. Sanlex khusus 5 Kg 238,750.00 Kaleng

12 Kuas besar 24,100.00 Bh13 Kuas kecil 10,200.00 Bh14 S p i r t u s 20,300.00 Ltr15 Kertas Gosok 5,100.00 Lbr16 Residu 7,300.00 Ltr17 Politur dasar 40,550.00 Ltr18 Politur Jadi ex Impra 74,050.00 Ltr19 Vernish Jadi 44,350.00 Ltr20 Batu apung 25,600.00 Kg

L. KERAMIK, UBIN

1 List keramik (Kuku Macan) p = 10 cm 1,000.00 Bh2 List keramik dinding t = 10 cm 23,450.00 m'3 Step Nosing 10x20 17,150.00 Bh4 Plint keramik 10x40 19,050.00 Bh5 Ubin Keramik 20 x 20 Wafel 60,800.00 m²6 Ubin Keramik 20 x 20 Polos 44,000.00 m²

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
H235
T K T B: 4"
I235
T K T B: 4"
H236
T K T B: 2"
I236
T K T B: 2"
Page 5: RAB rumah

Page 5

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

7 Ubin Keramik 20 x 25 Polos 55,500.00 m²8 Ubin Keramik 20 x 25 Motif 85,450.00 m²9 Ubin Keramik 30 x 30 Polos ex Mulia 40,000.00 m²10 Ubin Keramik 30 x 30 Motif ex Asia Tile 50,000.00 m²11 Ubin Keramik 40 x 40 Polos ex Mulia 45,000.00 m²12 Ubin Keramik 40 x 40 Motif ex Platinium 80,000.00 m²13 Tegel Abu - Abu 20 x 20 cm 27,250.00 m²14 Marmer Ujung Pandang

a. Marmer Brevia Premium / Marfil Lokal 739,700.00 m² b. Marmer cream malaga premium 396,800.00 m² c. Marmer cream malaga standart 403,750.00 m²

15 Marmer Tulung Agung

a. Marmer warna putih ex Tulung Agung 268,950.00 m²16 Marmer import

a. Trevertine Romeno Turkey Sleb ( Fillled ) 961,750.00 m² b. Trevertine Romeno Turkey Sleb ( Un Fillled ) 941,500.00 m² c. Bade Sabe China 60xPJG ( Poles ) 531,500.00 m²d. Blanco Sardo 60xPJG ( Poles ) 423,950.00 m²e. Black Galaxi SS Super India 60-80XPJG ( Poles ) 773,250.00 m²f. Black Galaxi India 60-Slab ( Poles ) 1,075,650.00 m²

17 Granit

a. Granit warna hitam / hijau ex Tulung Agung 336,700.00 m²18 Granito

a. Granito 30 x 30 cm Silver 208,850.00 m² b. Granito 30 x 30 cm Gold 222,150.00 m² c. Granito 40 x 40 cm type Salsa Unpolished 255,650.00 m²d. Granito 40 x 40 cm type Salsa Polished 289,200.00 m²e. Granito 40 x 40 cm type Palazzo Silver Polished 303,150.00 m²f. Granito 40 x 40 cm type Palazzo Gold Polished 327,150.00 m²g. Granito 40 x 40 cm type Rasello Silver Polished 229,100.00 m²h. Granito 40 x 40 cm type Rasello Gold Polished 249,350.00 m²i. Granito 60 x 60 cm type Salsa Ivori Unpolished 296,150.00 m²j. Granito 60 x 60 cm type Salsa Butterstone Unpolished 344,250.00 m²k. Granito 60 x 60 cm type Palazzo Silver Polished 347,400.00 m²l. Granito 60 x 60 cm type Palazzo Gold Polished 360,700.00 m²

19 Paving bata abu - abu 8 cm KW I ( K - 400 ) 94,950.00 m²20 Paving bata abu - abu 8 cm KW II ( K - 150 ) 78,500.00 m²21 Paving bata abu - abu 6 cm KW I ( K - 300 ) 69,050.00 m²22 Paving bata abu - abu 6 cm KW II ( K - 125 ) 60,800.00 m²23 Paving segi 6 abu - abu 8 cm KW I ( K - 400 ) 94,950.00 m²24 Paving segi 6 abu - abu 8 cm KW II ( K - 150 ) 78,500.00 m²25 Paving segi 6 abu - abu 6 cm KW I ( K - 300 ) 69,050.00 m²26 Paving segi 6 abu - abu 6 cm KW II ( K - 125 ) 60,800.00 m²27 Paving Variasi besar abu - abu 6 cm KW I ( K - 300 ) 69,050.00 m²28 Paving Uskup abu - abu 7 cm KW I 79,800.00 m²29 Kanstein 20 x 10 x 40 cm 12,050.00 Bj30 Kanstein 20 x 15 x 50 cm Profil 17,800.00 Bj31 Kanstein 35 x 15 x 50 cm Profil 31,050.00 Bj32 Kanstein 30 x 15 x 60 cm Profil 43,050.00 Bj33 Kanstein tanam 5,100.00 Bj34 Batako 10 x 20 x 40 cm 7,000.00 Bj35 Gress Block 10 x 36 x 53 cm 25,350.00 Bj

M. PIPA + ACCESSORIES

1 Knee GI 2" 28,750.00 Bh2 Tee GI 2" 37,500.00 Bh3 Pipa Besi 4" Galvanis (6 m' t = ± 2 mm) 694,650.00 Lj4 Pipa Besi 3" Galvanis (6 m' t = ± 2 mm) 527,150.00 Lj5 Pipa Besi 2 ½" Galvanis (6 m' t = ± 2 mm) 403,450.00 Lj6 Pipa Besi 2" Galvanis (6 m' t = ± 2 mm) 268,950.00 Lj7 Pipa Besi 1" Galvanis (6 m' t = ± 2 mm) 141,300.00 Lj8 Pipa Besi ¾" Galvanis (6 m' t = ± 2 mm) 134,650.02 Lj9 Pipa PVC AW 4" ( 4 m' ) Maspion 260,000.00 Lj

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 6: RAB rumah

Page 6

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

10 Pipa PVC AW 3" ( 4 m' ) Maspion 175,000.00 Lj11 Pipa PVC AW 2" ( 4 m' ) Maspion 115,250.00 Lj12 Pipa PVC AW 1 ½" ( 4 m' ) Maspion 81,100.00 Lj13 Pipa PVC AW 1" ( 4 m' ) Maspion 45,600.00 Lj14 Pipa PVC AW ¾" ( 4 m' ) Maspion 29,000.00 Lj15 Pipa PVC D 6" ( 4 m' ) Maspion 329,050.00 Lj16 Pipa PVC D 4" ( 4 m' ) Maspion 170,900.00 Lj17 Pipa PVC D 3" ( 4 m' ) Maspion 122,750.00 Lj18 Pipa PVC D 2½" ( 4 m' ) Maspion 83,550.00 Lj19 Pipa PVC D 2" ( 4 m' ) Maspion 58,300.00 Lj19 Pipa PVC D 1½" ( 4 m' ) Maspion 43,000.00 Lj20 Pipa PVC D 1¼" ( 4 m' ) Maspion 39,500.00 Lj20 Pipa PVC D 1" ( 4 m' ) Maspion 48,700.00 Lj21 Pipa PVC D ¾" ( 4 m' ) Maspion 33,000.00 Lj

N. BETON BUIS

1 Beton Buis Ø = 15 cm x 100 48,800.00 Bh

2 Beton Buis U = 15 cm x 100 24,700.00 Bh

3 Beton Buis Ø = 20 cm x 100 53,800.00 Bh4 Beton Buis U = 20 cm x 100 27,250.00 Bh5 Beton Buis Ø = 30 cm x 100 70,300.00 Bh6 Beton Buis U = 30 cm x 100 35,500.00 Bh7 Beton Buis Ø = 40 cm x 100 90,550.00 Bh8 Beton Buis Ø = 50 cm x 100 110,800.00 Bh9 Beton Buis Ø = 60 cm x 100 132,900.00 Bh10 Beton Buis Ø = 60 cm x 50 67,750.00 Bh11 Beton Buis Ø = 80 cm x 100 250,000.00 Bh12 Beton Buis Ø = 80 cm x 50 132,900.00 Bh13 Beton Buis Ø = 100 cm x 100 375,000.00 Bh14 Beton Buis Ø = 100 cm x 50 201,900.00 Bh

O. ASPAL, MINYAK DAN PELUMAS

1 Aspal drum pen 40/60 14,450.00 Kg2 Aspal 14,350.00 Kg3 Aspal Emulsi 17,000.00 Kg4 Minyak tanah industri/kerosin 9,000.00 Ltr5 Solar Subsidi 7,500.00 Ltr6 Solar Non Subsidi 12,450.00 Ltr7 Bensin Subsidi 8,500.00 Ltr8 Bensin Non Subsidi 12,450.00 Ltr9 Olie ( Minyak Pelumas ) 43,050.00 Ltr10 Gemuk / stenped 26,200.00 Kg11 Minyak Bekisting 5,100.00 Ltr12 L P G ( tabung 12 kg ) 121,550.00 Tabung

P. SANITAIR

1 Bak cuci piring 60 x 90 cm ex Metako 262,650.00 Bh2 Bak cuci ex Visa tebal 303,150.00 Bh3 Bak mandi fiber glass kotak 195,550.00 Bh4 Bak mandi fiber glass sudut 255,650.00 Bh5 Floor Drain plastik 19,050.00 Bh6 Floor Drain stainless steel 38,050.00 Bh7 Closed duduk (Ex TOTO) + watertank + klep 2,219,000.00 Unit8 Closed duduk Ex INA + accesoris 1,210,450.00 Unit9 Closed Jongkok Ex INA 151,900.00 Bh10 Closed Jongkok Ex TOTO 303,750.00 Bh11 Wastafel besar (Ex INA) 376,550.00 Bh12 Wastafel kecil (Ex INA) 279,050.00 Bh13 Urinoir Ex TOTO 2,017,150.00 Bh14 Kran air logam 41,150.00 Bh15 Seal Tape 3,850.00 Bh16 Shower standart 88,000.00 Bh

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 7: RAB rumah

Page 7

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

17 Tandon air 250 ltr Ex " Pura " 572,000.00 Bh18 Tandon air 320 ltr Ex " Pura " 639,100.00 Bh19 Tandon air 550 ltr Ex " Pura " 974,450.00 Bh20 Tandon air 700 ltr Ex " Pura " 1,008,600.00 Bh21 Tandon air 1.200 ltr Ex " Pura " 2,219,000.00 Bh22 Tandon air 2.000 ltr Ex " Pura " 3,092,750.00 Bh23 Pintu KM/WC PVC 200 x 70 cm 316,400.00 Unit24 Pintu Aluminium KM/WC 185 x 656 cm 296,150.00 Unit

O. PERALATAN LISTRIK

1 Lampu TL 20 watt ex Phillips 23,000.00 Unit2 Lampu TL 40 watt ex Phillips 28,750.00 Unit3 Lampu SL 8 watt ex Phillips 27,500.00 Unit4 Lampu SL 14 watt ex Phillips 36,600.00 Unit5 Lampu SL 18 watt ex Phillips 40,700.00 Unit6 Lampu SL 23 watt ex Phillips 45,450.00 Unit7 Lampu Dop (bolamp) ex Phillips 40 watt 7,500.00 Unit8 Downlight ex Phillips 4" 60,000.00 Bh9 Downlight ex Phillips 5" 68,750.00 Bh10 Downlight ex China 4" 34,350.00 Bh11 Downlight ex China 5" 38,750.00 Bh12 Saklar tunggal ex Brocco 13,750.00 Bh13 Saklar ganda ex Brocco 19,350.00 Bh14 Stop kontak 17,000.00 Bh15 Stop kontak AC 64,500.00 Bh16 Stop kontak outlet TV 50,000.00 Bh17 Stop kontak outlet Telephon 59,650.00 Bh18 Pas. instalasi listrik dalam non Saklar/stop kontak 133,900.00 Ttk19 Exhaust fan kecil "Maspion" 193,750.00 Bh20 Exhaust fan besar "Maspion" 365,250.00 Bh21 Lampu emergency 250,000.00 Bh

P. BAHAN / MATERIAL TERPASANG

1 Auning + rangka hollow 322,750.00 m²2 Polycarbonat exs twinlite rangka hollow 397,500.00 m²3 Polycarbonat exs twinlite rangka stainless 534,000.00 m²4 Kuda-kuda baja ringan dibawah 35º

a. bentang ≥ 6 meter ( ex : smartruss) 253,150.00 m² b. bentang 6 meter s/d 8 meter (ex: smartruss) 272,150.00 m² c. bentang 8 meter s/d 10 meter (ex: smartruss) 284,800.00 m² a. bentang ≥ 6 meter ( ex : kencana) 164,550.00 m² b. bentang 6 meter s/d 8 meter (ex: kencana) 170,900.00 m² c. bentang 8 meter s/d 10 meter (ex: kencana) 177,200.00 m²d. bentang 10 meter s/d 12 meter 210,000.00 m²e. bentang 12 meter s/d 14 meter 223,100.00 m²f. bentang 14 meter s/d 16 meter 232,800.00 m²g. bentang 16 meter s/d 18 meter 250,000.00 m²h. bentang ≥ 18 meter 257,200.00 m²

5 Kusen Alluminium 3" Putih ex alexindo 91,800.00 m'6 Kusen Alluminium 3" Warna ex alexindo 101,300.00 m'7 Kusen Alluminium 4" Putih ex alexindo 96,850.00 m'8 Kusen Alluminium 4" Warna ex alexindo 105,050.00 m'9 Kusen Alluminium 3" putih ex Indall 101,300.00 m'10 Kusen Alluminium 3" warna ex Indall 107,600.00 m'11 Kusen Alluminium 4" putih ex Indall 105,050.00 m'12 Kusen Alluminium 4" warna ex Indall 110,800.00 m'13 Jalusi aluminium 524,550.00 m²14 Alluminium composite panel 622,600.00 m²15 Plafond Gypsumboard rangka hollow galvanis 121,550.00 m²16 Plafond rangka hollow 101,300.00 m²17 Daun pintu + acc Alpha/ATT lengkap warna 774,100.00 m²18 Daun pintu + acc Alpha/ATT lengkap putih 739,650.00 m²19 Daun jendela Kaca + acc Alpha/ATT lengkap warna 511,950.00 m²

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 8: RAB rumah

Page 8

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

20 Daun jendela Kaca + acc Alpha/ATT lengkap putih 470,350.00 m²21 Pintu kaca 1cm +acc, lebar 1 m 3,455,900.00 unit22 Beton sikat 312,500.00 m²23 Water profing membran 113,150.00 m²24 Partisi rangka profil C + penutup 195,050.00 m²25 Wallpaper 84,800.00 m²26 Pintu harmonika ex Jombang 1,040,800.00 m²27 Rollingdoor 650,500.00 m²28 Pagar Hollow 4cm jarak 6cm 484,450.00 m²29 Cat melamin

a. Daun pintu doof 40,400.00 m² b. Daun pintu glos 36,400.00 m² c. Daun kusen / daun jendela doof 15,450.00 m²d. Daun kusen / daun jendela glos 58,950.00 m²

30 Cat duko

a. Daun pintu doof 466,650.00 m² b. Daun pintu glos 426,300.00 m² c. Daun kusen / daun jendela doof 100,900.00 m²d. Daun kusen / daun jendela glos 94,200.00 m²

31 Cat motif marmer / serat kayu

a. Dinding 235,350.00 m² b. Listplank 121,100.00 m² c. Pilar 342,950.00 m²

32 Cat dekoratif

a. Dinding 736,500.00 m² b. Listplank 88,650.00 m² c. Pilar 70,950.00 m²

33 List gypsum lebar 7 cm 14,600.00 m'34 List gypsum lebar 12 cm 17,800.00 m'35 List gypsum lebar 15 cm 25,350.00 m'36 Kaca patri / stain timah 1,307,200.00 m²37 Kaca patri / stain timah triple 1,633,700.00 m²38 Kaca stain kuningan triple 2,179,100.00 m²39 Kaca Painting 5 mm 470,750.00 m²40 Kaca Gravir warna 5 mm 606,200.00 m²41 Kaca Gravir polos 5 mm 673,300.00 m²42 Sewa skafolding 46,650.00 set/bulan43 Sewa bor pile 6,900.00 jam42 pasang reng usuk baja ringan 127,850.00 m243 Pasang Instalasi Listrik

a. Pas instalasi listrik indoor + fitting 127,200.00 Ttk Kbl NYA 2x1,5 mm2 (non saklar/stop kontak)

b. Pas titik stop kontak (reguler) Kbl NYA (2) 2,5 mm2 97,550.00 Ttk c. Pasang titik stop kontak (khusus/laboratorium) 123,000.00 Ttk

Kbl NYA (3) 2,5 mm2 d. Pasang titik stop kontak AC Kbl NYA (3) 4 mm2 106,000.00 Ttk

44 Mobilisasi peralatan dan testing pekerjaan Hotmix

a. Mobilisasi peralatan hotmix 1,950,000.00 Ls b. Testing pekerjaan hotmix 70,000.00 Ttk

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 9: RAB rumah

Page 9

NO. BAHAN / MATERIAL KODE HARGA SATUAN SATUAN KETERANGAN

B. UPAH TENAGA KERJA

NO. BAHAN / MATERIAL KODE SATUAN HARIAN (OH)

1 Pekerja 7,857.14 jam 55,000.00 2 T u k a n g 10,000.00 jam 70,000.00 3 M a n d o r 11,428.57 jam 80,000.00 4 Operator 12,142.86 jam 85,000.00 5 Pembantu Operator 10,000.00 jam 70,000.00 6 Sopir / Driver 9,285.71 jam 65,000.00 7 Pembantu Sopir / Driver 7,857.14 jam 55,000.00 8 Mekanik 12,142.86 jam 85,000.00 9 Pembantu Mekanik 7,857.14 jam 55,000.00 10 Kepala Tukang 10,714.29 jam 75,000.00

Asumsi : lama kerja dalam 1 hari adalah 7 jam efektif

I8
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
I492
T K T B: Survey By Dony Biyantoro Toko Besi Banjar Jl. Mayjend Sungkono
Page 10: RAB rumah

A Analisa biaya kontruksi pekerjaan persiapan dan tanah

1 1 m³ Bongkaran beton bertulang

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 6.6670 55,000.00 Mandor Oh 0.3330 80,000.00

DIBULATKAN

-

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m³ Bongkaran dinding tembok batu bata

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 2.0000 55,000.00 Mandor Oh 0.1000 80,000.00

DIBULATKAN

-

DIBULATKAN Pekerjaan Pada Lantai 2

3 1 m² Menurunkan genting, genting tidak dipakai lagi

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 0.0100 55,000.00 Mandor Oh 0.0050 80,000.00

DIBULATKAN

-

DIBULATKAN Pekerjaan Pada Lantai 2

4 1 m² Menurunkan rangka penutup atap (usuk+reng), bongkaran tidak dipakai lagi

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 0.1000 55,000.00 Mandor Oh 0.0500 80,000.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 11: RAB rumah

DIBULATKAN

-

DIBULATKAN Pekerjaan Pada Lantai 2

5 1 m³ Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran tidak dipakai lagi

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Tukang kayu Oh 4.0000 70,000.00 Kepala tukang Oh 0.4000 75,000.00

DIBULATKAN

-

DIBULATKAN Pekerjaan Pada Lantai 2

6 1 m² Pembuatan stegger bambu untuk andang

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Bambu Ø 6 - 8 cm/600 cm Btg 1.0000 21,550.00 21,550.00

Tali ijuk m² 0.2500 20,300.00 5,075.00 2 Tenaga

Tukang kayu Oh 0.0170 70,000.00 Pekerja Oh 0.2500 55,000.00 Kepala tukang Oh 0.0020 75,000.00 Mandor Oh 0.0130 80,000.00

26,625.00

DIBULATKAN

7 1 m³ Galian tanah biasa sedalam 1 meter

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 0.7500 55,000.00 Mandor Oh 0.0250 80,000.00

DIBULATKAN

8 1 m³ Urugan tanah kembali

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Tenaga

Pekerja Oh 0.2500 55,000.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 12: RAB rumah

Mandor Oh 0.0083 80,000.00

DIBULATKAN

9 1 m³ Urugan Tanah dipadatkan dengan Tenaga buruh

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Tanah urug m³ 1.2000 74,850.00 89,820.00 2 Tenaga

Pekerja Oh 0.8000 55,000.00 Mandor Oh 0.0600 80,000.00

89,820.00

DIBULATKAN

B Analisa biaya kontruksi Pekerjaan pondasi batu kali

1 1 m³ Pasang pondasi batu kali, 1 PC : 6 Ps

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Batu belah 15/20 cm m³ 1.2000 170,800.00 204,960.00 PC Kg 117.0000 1,400.00 163,800.00 Pasir pasang m³ 0.5610 221,200.00 124,093.20

2 Tenaga

Pekerja Oh 1.5000 55,000.00 Tukang batu Oh 0.7500 70,000.00 Kepala tukang Oh 0.0750 75,000.00 Mandor Oh 0.0750 80,000.00

492,853.20

DIBULATKAN

2 1 m³ Pasang pondasi batu kosong / Aanstampeng

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Batu belah 15/20 cm m³ 1.2000 170,800.00 204,960.00 Pasir urug m³ 0.4320 98,650.00 42,616.80

2 Tenaga

Pekerja Oh 0.7800 55,000.00 Tukang batu Oh 0.3900 70,000.00 Kepala tukang Oh 0.0390 75,000.00 Mandor Oh 0.0390 80,000.00

247,576.80

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 13: RAB rumah

DIBULATKAN

C Analisa biaya kontruksi Pekerjaan pasangan dinding

1 1 m² Pasangan Batu bata tebal ½ bata, 1 PC : 3 Ps

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Batu bata Bh 70.0000 1,000.00 70,000.00 PC Kg 14.3700 1,400.00 20,118.00 Pasir pasang m³ 0.0400 221,200.00 8,848.00

2 Tenaga

Pekerja Oh 0.3000 55,000.00 Tukang batu Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0150 80,000.00

98,966.00

DIBULATKAN

98,966.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m² Pasangan dinding roster/krawangan 11 x 15 x 22

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Roster beton 11x15x22 Bh 30.0000 8,000.00 240,000.00 PC Kg 14.0000 1,400.00 19,600.00 Pasir pasang m³ 0.0320 221,200.00 7,078.40

2 Tenaga

Pekerja Oh 0.3000 55,000.00 Tukang batu Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0150 80,000.00

266,678.40

DIBULATKAN

266,678.40

DIBULATKAN Pekerjaan Pada Lantai 2

D Analisa biaya kontruksi Pekerjaan plesteran

1 1 m² Plesteran 1PC : 3Ps tebal 15 mm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 14: RAB rumah

PC Kg 7.7760 1,400.00 10,886.40 Pasir pasang m³ 0.0230 221,200.00 5,087.60

2 Tenaga

Pekerja Oh 0.3000 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0150 80,000.00

15,974.00

DIBULATKAN

15,974.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m² Plesteran sekoning ( Benangan ) 1PC : 2Ps

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

PC Kg 0.5000 1,400.00 700.00 Pasir pasang m³ 0.0130 221,200.00 2,875.60

2 Tenaga

Pekerja Oh 0.0800 55,000.00 Tukang batu Oh 0.0400 70,000.00 Kepala tukang Oh 0.0400 75,000.00 Mandor Oh 0.0040 80,000.00

3,575.60

DIBULATKAN

3,575.60

DIBULATKAN Pekerjaan Pada Lantai 2

E Analisa biaya kontruksi Pekerjaan kayu

1 1 m³ Pasang Kusen Pintu dan Jendela Kayu Jati

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu jati balok A2 m³ 1.1000 20,167,800.00 22,184,580.00 Paku Kg 1.2500 13,000.00 16,250.00 Lem kayu Kg 1.0000 13,350.00 13,350.00

2 Tenaga

Pekerja Oh 7.0000 55,000.00 Tukang kayu Oh 21.0000 70,000.00 Kepala tukang Oh 2.1000 75,000.00 Mandor Oh 0.3500 80,000.00

22,214,180.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 15: RAB rumah

DIBULATKAN

22,214,180.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m² Pasang Daun Pintu Panel Kayu Jati

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu jati balok A2 m³ 0.0400 20,167,800.00 806,712.00 Lem kayu Kg 0.5000 13,350.00 6,675.00

2 Tenaga

Pekerja Oh 1.0000 55,000.00 Tukang kayu Oh 3.0000 70,000.00 Kepala tukang Oh 0.3000 75,000.00 Mandor Oh 0.0500 80,000.00

813,387.00

DIBULATKAN

813,387.00

DIBULATKAN Pekerjaan Pada Lantai 2

3 1 m² Pasang Daun Jendela Kayu Jati

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu jati balok A2 m³ 0.0240 20,167,800.00 484,027.20 Lem kayu Kg 0.3000 13,350.00 4,005.00

2 Tenaga

Pekerja Oh 0.8000 55,000.00 Tukang kayu Oh 2.4000 70,000.00 Kepala tukang Oh 0.2400 75,000.00 Mandor Oh 0.0400 80,000.00

488,032.20

DIBULATKAN

488,032.20

DIBULATKAN Pekerjaan Pada Lantai 2

4 1 m³ Pasang Kontruksi Kuda-Kuda Kayu jati

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu jati A2 m³ 1.1000 20,167,800.00 22,184,580.00 Besi strip Kg 15.0000 17,000.00 255,000.00 Paku biasa Kg 5.6000 13,000.00 72,800.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 16: RAB rumah

2 Tenaga

Pekerja Oh 4.0000 55,000.00 Tukang kayu Oh 12.0000 70,000.00 Kepala tukang Oh 1.2000 75,000.00 Mandor Oh 0.2000 80,000.00

22,512,380.00

DIBULATKAN

22,512,380.00

DIBULATKAN Pekerjaan Pada Lantai 2

5 1 m² Pasang kaso Jati 5/7 + reng Jati genteng keramik

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu Jati 5/7 m³ 0.0080 8,765,000.00 70,120.00 Kayu jati reng 3/5 m³ 0.0060 6,711,900.00 40,271.40 Paku biasa Kg 0.1500 13,000.00 1,950.00

2 Tenaga

Pekerja Oh 0.1000 55,000.00 Tukang kayu Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0050 80,000.00

112,341.40

DIBULATKAN

112,341.40

DIBULATKAN Pekerjaan Pada Lantai 2

6 1 m' Pasang lisplang GRC t = 9 mm, lebar 20 cm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Papan GRC 9 mm lebar 20 cm m' 1.0500 24,700.00 25,935.00 Reng pengaku 3/5 kruing m³ 0.0015 7,572,350.00 11,358.53 Paku biasa Kg 0.0500 13,000.00 650.00

2 Tenaga

Pekerja Oh 0.1100 55,000.00 Tukang batu Oh 0.2200 70,000.00 Kepala tukang Oh 0.0220 75,000.00 Mandor Oh 0.0050 80,000.00

37,943.53

DIBULATKAN

37,943.53

DIBULATKAN Pekerjaan Pada Lantai 2

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

B271
USER: KASO KAMPER DAN JATI INDEKSNYA SAMA
Page 17: RAB rumah

F Analisa biaya kontruksi Pekerjaan beton

1 1 m² Beton rabat

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

PC Kg 230.0000 1,400.00 322,000.00 Pasir beton m³ 0.6300 260,800.00 164,304.00 Batu pecah 2 - 3 m³ 0.7600 284,650.00 216,334.00

2 Tenaga

Pekerja Oh 1.2000 55,000.00 Tukang batu Oh 0.2000 70,000.00 Kepala tukang Oh 0.0200 75,000.00 Mandor Oh 0.0600 80,000.00

702,638.00 1 m² beton rabat tebal 5 cm 5 / 100 x

DIBULATKAN

1 m² beton rabat tebal 7 cm 7 / 100 x

DIBULATKAN

2 1 m³ Membuat beton bertulang camp 1pc : 2ps : 3 kr ( ex semen holcim )

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

PC Kg 326.0000 1,400.00 456,400.00 Pasir beton m³ 0.5400 260,800.00 140,832.00 Batu pecah 2 - 3 m³ 0.7600 284,650.00 216,334.00

2 Tenaga

Pekerja Oh 1.6500 55,000.00 Tukang batu Oh 0.2760 70,000.00 Kepala tukang Oh 0.0280 75,000.00 Mandor Oh 0.0830 80,000.00

813,566.00

DIBULATKAN

3 1 m³ Membuat beton bertulang dengan mutu K 225

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

PC Kg 371.0000 1,400.00 519,400.00 Pasir beton m³ 0.4980 260,800.00 129,878.40 Batu pecah 2 - 3 m³ 0.7760 284,650.00 220,888.40

2 Tenaga

Pekerja Oh 1.6500 55,000.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 18: RAB rumah

Tukang batu Oh 0.2750 70,000.00 Kepala tukang Oh 0.0280 75,000.00 Mandor Oh 0.0830 80,000.00

870,166.80

DIBULATKAN

4 1 Kg pembesian dengan besi polos

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Besi beton polos Kg 1.0500 11,500.00 12,075.00 Kawat beton Kg 0.0150 10,500.00 157.50

2 Tenaga

Pekerja Oh 0.0070 55,000.00 Tukang besi Oh 0.0070 70,000.00 Kepala tukang Oh 0.0007 75,000.00 Mandor Oh 0.0003 80,000.00

12,232.50

DIBULATKAN

5 1 m² Pasang begesting untuk pondasi

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0400 3,697,600.00 147,904.00 Paku biasa Kg 0.3000 13,000.00 3,900.00 Minyak begesting Lt 0.1000 5,100.00 510.00

2 Tenaga

Pekerja Oh 0.5200 55,000.00 Tukang kayu Oh 0.2600 70,000.00 Kepala tukang Oh 0.0260 75,000.00 Mandor Oh 0.0260 80,000.00

152,314.00

DIBULATKAN

dipakai 2x ( sewa )

6 1 m² Pasang begesting untuk sloof + struktur praktis

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0450 3,697,600.00 166,392.00 Paku biasa Kg 0.3000 13,000.00 3,900.00 Minyak begesting Lt 0.1000 5,100.00 510.00

2 Tenaga

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 19: RAB rumah

Pekerja Oh 0.5200 55,000.00 Tukang kayu Oh 0.2600 70,000.00 Kepala tukang Oh 0.0260 75,000.00 Mandor Oh 0.0260 80,000.00

170,802.00

DIBULATKAN

dipakai 2x ( sewa )

7 1 m² Pasang begesting untuk kolom

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0400 3,697,600.00 147,904.00 Paku biasa Kg 0.4000 13,000.00 5,200.00 Minyak begesting Lt 0.2000 5,100.00 1,020.00 Balok kayu lokal m³ 0.0150 3,697,600.00 55,464.00 Multipleks tebal 9 mm Lbr 0.3500 126,000.00 44,100.00 Kayu stoot Bt 2.0000 24,100.00 48,200.00

2 Tenaga

Pekerja Oh 0.6600 55,000.00 Tukang kayu Oh 0.3300 70,000.00 Kepala tukang Oh 0.0330 75,000.00 Mandor Oh 0.0330 80,000.00

301,888.00

DIBULATKAN

dipakai 2x ( sewa )

8 1 m² Pasang begesting untuk balok

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0400 3,697,600.00 147,904.00 Paku biasa Kg 0.4000 13,000.00 5,200.00 Minyak begesting Lt 0.2000 5,100.00 1,020.00 Balok kayu lokal m³ 0.0180 3,697,600.00 66,556.80 Multipleks tebal 9 mm Lbr 0.3500 126,000.00 44,100.00 Kayu stoot Bt 2.0000 24,100.00 48,200.00

2 Tenaga

Pekerja Oh 0.6600 55,000.00 Tukang kayu Oh 0.3300 70,000.00 Kepala tukang Oh 0.0330 75,000.00 Mandor Oh 0.0330 80,000.00

312,980.80

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 20: RAB rumah

DIBULATKAN

dipakai 2x ( sewa )

9 1 m² Pasang begesting untuk lantai

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0400 3,697,600.00 147,904.00 Paku biasa Kg 0.4000 13,000.00 5,200.00 Minyak begesting Lt 0.2000 5,100.00 1,020.00 Balok kayu lokal m³ 0.0150 3,697,600.00 55,464.00 Multipleks tebal 9 mm Lbr 0.3500 126,000.00 44,100.00 Kayu stoot Bt 6.0000 24,100.00 144,600.00

2 Tenaga

Pekerja Oh 0.6600 55,000.00 Tukang kayu Oh 0.3300 70,000.00 Kepala tukang Oh 0.0330 75,000.00 Mandor Oh 0.0330 80,000.00

398,288.00

DIBULATKAN

dipakai 2x ( sewa )

10 1 m² Pasang begesting untuk tangga

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kayu lokal m³ 0.0300 3,697,600.00 110,928.00 Paku biasa Kg 0.4000 13,000.00 5,200.00 Minyak begesting Lt 0.1500 5,100.00 765.00 Balok kayu lokal m³ 0.0150 3,697,600.00 55,464.00 Multipleks tebal 9 mm Lbr 0.3500 126,000.00 44,100.00 Kayu stoot Bt 2.0000 24,100.00 48,200.00

2 Tenaga

Pekerja Oh 0.6600 55,000.00 Tukang kayu Oh 0.3300 70,000.00

Kepala tukang Oh 0.0330 75,000.00

Mandor Oh 0.0330 80,000.00 264,657.00

DIBULATKAN

dipakai 2x ( sewa )

11 1 m³ Membuat Platpor 60/60/30

NO URAIAN SAT INDEKS JUMLAH ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 21: RAB rumah

NO URAIAN SAT INDEKS BAHAN

Beton bertulang mutu 225 m³ 1.0000 988,900.00 988,900.00 Besi polos Ø16 Kg 141.5800 13,150.00 1,861,777.00 Begesting ( 2 x pakai ) m2 0.1800 101,550.00 18,279.00

2,868,956.00

DIBULATKAN

12 1 m³ Membuat sloof 15/25

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00 Besi polos 6Ø12, 2Ø10, Ø8 - 150 Kg 194.6500 13,150.00 2,559,647.50 Begesting praktis m³ 4.4000 221,600.00 975,040.00

4,467,037.50

DIBULATKAN

13 1 m³ Membuat kolom praktis 11/11

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø10, Ø6 - 200 Kg 240.8500 13,150.00 3,167,177.50 Begesting praktis ( 2 x pakai ) m³ 7.2600 110,800.00 804,408.00

4,903,935.50

DIBULATKAN

14 1 m³ Membuat kolom 15/15

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø12, Ø6 - 200 Kg 182.2000 13,150.00 2,395,930.00 Begesting kolom ( 2 x pakai ) m³ 4.4000 183,200.00 806,080.00

4,134,360.00

DIBULATKAN

15 1 m³ Membuat kolom 15/25

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø12, Ø6 - 200 Kg 112.6200 13,150.00 1,480,953.00 Begesting praktis ( 2 x pakai ) m³ 2.9500 183,200.00 540,440.00

2,953,743.00

DIBULATKAN

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 22: RAB rumah

16 1 m³ Membuat kolom 15/30

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00 Besi polos 6 Ø12, Ø8 - 200 Kg 94.4000 13,150.00 1,241,360.00 Begesting kolom m³ 4.4400 366,400.00 1,626,816.00

3,800,526.00

DIBULATKAN

17 1 m³ Membuat ring balok praktis 12/15

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø10, Ø6 - 200 Kg 165.6220 13,150.00 2,177,929.30 Begesting praktis ( 2 x pakai ) m2 7.2700 221,600.00 1,611,032.00

4,721,311.30

DIBULATKAN

18 1 m³ Membuat beton balok 15/20

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø12, Ø6 - 120 Kg 107.2700 13,150.00 1,410,600.50 Begesting balok m2 5.3300 377,450.00 2,011,808.50

4,354,759.00

DIBULATKAN

19 1 m³ Membuat beton balok 15/25

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang m³ 1.0000 932,350.00 932,350.00 Besi polos 4 Ø12, Ø6 - 120 Kg 124.8800 13,150.00 1,642,172.00 Begesting balok m2 3.7800 377,450.00 1,426,761.00

4,001,283.00

DIBULATKAN

20 1 m³ Membuat beton balok 15/35

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 932,350.00 932,350.00

Besi polos 5 Ø 12, E 8 - 200 mm Kg 160.0900 13,150.00 2,105,183.50 Begesting balok m³ 2.0000 377,450.00 754,900.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 23: RAB rumah

3,792,433.50

DIBULATKAN

21 1 m³ Membuat beton Plat lantai t.12 cm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang mutu 225 m³ 1.0000 988,900.00 988,900.00

Besi polos Ø 10 - 15 mm Kg 144.6100 13,150.00 1,901,621.50

Bekisting lantai m2 2.7489 462,800.00 1,272,190.92 4,162,712.42

DIBULATKAN

22 1 m³ Membuat beton Plat atap t.8 cm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang praktis m³ 1.0000 988,900.00 988,900.00

Besi polos Ø 10 - 200 mm Kg 55.8400 13,150.00 734,296.00

Bekisting lantai m³ 3.1000 462,800.00 1,434,680.00 3,157,876.00

DIBULATKAN

23 1 m³ Membuat beton Plat tangga t.10 cm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

Beton bertulang mutu 225 m³ 1.0000 988,900.00 988,900.00

Besi polos Ø 10 - 200 mm Kg 57.8400 13,150.00 760,596.00

Bekisting plat tangga m³ 3.9667 329,150.00 1,305,628.33 3,055,124.33

DIBULATKAN

24 1 m² Pasang paving block

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Pavingstone abu-abu Kw II 8 cm ( K 150 ) m² 1.0500 78,500.00 82,425.00 Pasir urug m³ 0.0250 98,650.00 2,466.25

2 Tenaga

Pekerja Oh 0.0250 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0030 80,000.00 Jumlah bahan + upah paving Kw II 8 cm ( K 150 ) 84,891.25

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 24: RAB rumah

DIBULATKAN

G Analisa biaya kontruksi Pekerjaan penutup atap

1 1 m² Pasang atap genteng keramik / glazur

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Genteng keramik / glazur Bj 14.5000 9,000.00 130,500.00 2 Tenaga

Pekerja Oh 0.1500 55,000.00 Tukang batu Oh 0.0600 70,000.00 Kepala tukang Oh 0.0060 75,000.00 Mandor Oh 0.0080 80,000.00

130,500.00

DIBULATKAN

130,500.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m' Pasang genteng bubungan keramik / glazur

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Genteng bubungan keramik / glazur Bj 4.0000 20,000.00 80,000.00 PC Kg 8.0000 1,400.00 11,200.00 Pasir pasang m³ 0.0320 221,200.00 7,078.40

2 Tenaga

Pekerja Oh 0.4000 55,000.00 Tukang batu Oh 0.2000 70,000.00 Kepala tukang Oh 0.0200 75,000.00 Mandor Oh 0.0200 80,000.00

98,278.40

DIBULATKAN

98,278.40

DIBULATKAN Pekerjaan Pada Lantai 2

H Analisa biaya kontruksi Pekerjaan langit - langit borongan --> 110000 / m2

I Analisa biaya kontruksi Pekerjaan pipa dan sanitasi

1 Memasang closed duduk + acc ex INA

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 25: RAB rumah

Closed duduk + acc ex INA Lbr 1.0000 1,100,000.00 1,100,000.00 2 Tenaga

Pekerja Oh 0.3300 55,000.00 Tukang Oh 1.1000 70,000.00 Kepala tukang Oh 0.0010 75,000.00 Mandor Oh 0.1600 80,000.00

1,100,000.00

DIBULATKAN

1,100,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 Memasang wastafel kecil ex INA

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Wastafel kecil ex INA Bh 1.0000 800,000.00 800,000.00 pc kg 6.0000 1,400.00 8,400.00 pasir pasang m3 0.0100 221,200.00 2,212.00

2 Tenaga

Pekerja Oh 0.1000 55,000.00 Tukang Oh 1.1000 70,000.00 Kepala tukang Oh 0.1100 75,000.00 Mandor Oh 0.0100 80,000.00

810,612.00

DIBULATKAN

810,612.00

DIBULATKAN Pekerjaan Pada Lantai 2

3 Memasang kran diameter ½ atau ¾

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kran air Bh 1.0000 41,150.00 41,150.00 Seal tape Bh 0.0250 3,850.00 96.25

2 Tenaga

Pekerja Oh 0.0100 55,000.00 Tukang Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0050 80,000.00

41,246.25

DIBULATKAN

41,246.25

DIBULATKAN Pekerjaan Pada Lantai 2

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 26: RAB rumah

4 Memasang floor drain stainless stel

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Floor drain stainless stel Bh 1.0000 38,050.00 38,050.00 2 Tenaga

Pekerja Oh 0.0100 55,000.00 Tukang batu Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0050 80,000.00

38,050.00

DIBULATKAN

38,050.00

DIBULATKAN Pekerjaan Pada Lantai 2

5 Memasang 1 m' pipa PVC AW Ø 3/4"

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Pipa PVC AW Ø 3/4" m' 1.0500 7,250.00 7,612.50 Acecoris ( 35 % dari harga pipa ) Hrg 0.3500 7,250.00 2,537.50

2 Tenaga

Pekerja Oh 0.0360 55,000.00 Tukang batu Oh 0.0600 70,000.00 Kepala tukang Oh 0.0060 75,000.00 Mandor Oh 0.0018 80,000.00

10,150.00

DIBULATKAN

10,150.00

DIBULATKAN Pekerjaan Pada Lantai 2

6 Memasang 1 m' pipa PVC kelas AW Ø 3"

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Pipa kelas D Ø 3" m' 1.0500 43,750.00 45,937.50 Acecoris ( 35 % dari harga pipa ) Hrg 0.3500 43,750.00 15,312.50

2 Tenaga

Pekerja Oh 0.0810 55,000.00 Tukang batu Oh 0.1350 70,000.00 Kepala tukang Oh 0.0014 75,000.00 Mandor Oh 0.0410 80,000.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 27: RAB rumah

61,250.00

DIBULATKAN

61,250.00

DIBULATKAN Pekerjaan Pada Lantai 2

J Analisa biaya kontruksi Pekerjaan kunci dan kaca

1 1 buah pasang kunci tanam ex. Yale

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kuncin tanam ex Yale Bh 1.0000 186,750.00 186,750.00 2 Tenaga

Pekerja Oh 0.0100 55,000.00 Tukang batu Oh 0.5000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0050 80,000.00

186,750.00

DIBULATKAN

186,750.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 buah pasang engsel pintu

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Engsel pintu Bh 1.0000 65,000.00 65,000.00 2 Tenaga

Pekerja Oh 0.0150 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0008 80,000.00

65,000.00

DIBULATKAN

65,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

3 1 buah pasang engsel jendela

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Engsel jendela Bh 1.0000 22,800.00 22,800.00 2 Tenaga

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 28: RAB rumah

Pekerja Oh 0.0100 55,000.00 Tukang batu Oh 0.1000 70,000.00 Kepala tukang Oh 0.0100 75,000.00 Mandor Oh 0.0005 80,000.00

22,800.00

DIBULATKAN

22,800.00

DIBULATKAN Pekerjaan Pada Lantai 2

4 1 buah pasang Grendel Pintu

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Grendel Pintu Bh 1.0000 45,000.00 45,000.00 2 Tenaga

Pekerja Oh 0.0150 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0075 80,000.00

45,000.00

DIBULATKAN

45,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

5 1 buah pasang Grendel Jendela

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Grendel Jendela Bh 1.0000 30,000.00 30,000.00 2 Tenaga

Pekerja Oh 0.0150 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0075 80,000.00

30,000.00

DIBULATKAN

30,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

6 1 buah pasang Handel Pintu Utama

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 29: RAB rumah

Handel Pintu Bh 1.0000 150,000.00 150,000.00 2 Tenaga

Pekerja Oh 0.0150 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0075 80,000.00

150,000.00

DIBULATKAN

150,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

7 1 buah pasang kait angin

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kait angin Bh 1.0000 40,000.00 40,000.00 2 Tenaga

Pekerja Oh 0.0150 55,000.00 Tukang batu Oh 0.1500 70,000.00 Kepala tukang Oh 0.0150 75,000.00 Mandor Oh 0.0075 80,000.00

40,000.00

DIBULATKAN

40,000.00

DIBULATKAN Pekerjaan Pada Lantai 2

8 1 m² pasang kaca rayband, tebal 5 mm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Kaca rayband 5 mm m² 1.10000 113,900.00 125,290.00 2 Tenaga

Pekerja Oh 0.01500 55,000.00 Tukang batu Oh 0.15000 70,000.00 Kepala tukang Oh 0.01500 75,000.00 Mandor Oh 0.00075 80,000.00

125,290.00

DIBULATKAN

125,290.00

DIBULATKAN Pekerjaan Pada Lantai 2

K Analisa biaya kontruksi Pekerjaan Penutup lantai

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 30: RAB rumah

1 1 m² pasang lantai keramik 20 x 20 cm motif

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin keramik 20x20 cm motif m² 1.0500 60,800.00 63,840.00 PC Kg 10.4000 1,400.00 14,560.00 Pasir pasang m³ 0.0450 221,200.00 9,954.00 Semen warna Kg 0.1600 14,350.00 2,296.00

2 Tenaga

Pekerja Oh 0.2600 55,000.00 Tukang batu Oh 0.1250 70,000.00 Kepala tukang Oh 0.0125 75,000.00 Mandor Oh 0.0130 80,000.00

90,650.00

DIBULATKAN

90,650.00

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m² pasang lantai keramik 30 x 30 cm motif

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin keramik 30x30 cm motif m² 1.0500 50,000.00 52,500.00 PC Kg 10.0000 1,400.00 14,000.00 Pasir pasang m³ 0.0450 221,200.00 9,954.00 Semen warna Kg 0.1500 14,350.00 2,152.50

2 Tenaga

Pekerja Oh 0.2600 55,000.00 Tukang batu Oh 0.1300 70,000.00 Kepala tukang Oh 0.0130 75,000.00 Mandor Oh 0.0130 80,000.00

78,606.50

DIBULATKAN

78,606.50

DIBULATKAN Pekerjaan Pada Lantai 2

3 1 m² pasang lantai keramik 40 x 40 cm motif

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin keramik 40x40 cm motif m² 1.0500 80,000.00 84,000.00 PC Kg 9.8000 1,400.00 13,720.00 Pasir pasang m³ 0.0450 221,200.00 9,954.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 31: RAB rumah

Semen warna Kg 0.1500 14,350.00 2,152.50 2 Tenaga

Pekerja Oh 0.2500 55,000.00 Tukang batu Oh 0.1250 70,000.00 Kepala tukang Oh 0.0130 75,000.00 Mandor Oh 0.0130 80,000.00

109,826.50

DIBULATKAN

109,826.50

DIBULATKAN Pekerjaan Pada Lantai 2

4 1 m² pasang lantai ubin granit cream 60 x 60 cm ex Cina

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin granito 60x60 cm cream m² 1.0500 170,000.00 178,500.00 PC Kg 9.8000 1,400.00 13,720.00 Pasir pasang m³ 0.0450 221,200.00 9,954.00 Semen warna Kg 0.1300 14,350.00 1,865.50

2 Tenaga

Pekerja Oh 0.2500 55,000.00 Tukang batu Oh 0.1250 70,000.00 Kepala tukang Oh 0.0130 75,000.00 Mandor Oh 0.0130 80,000.00

204,039.50

DIBULATKAN

204,039.50

DIBULATKAN Pekerjaan Pada Lantai 2

5 1 m² pasang dinding keramik 20 x 25 cm polos

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin keramik 20x25 cm polos m² 1.0500 55,500.00 58,275.00 PC Kg 9.3000 1,400.00 13,020.00 Pasir pasang m³ 0.0180 221,200.00 3,981.60 Semen warna Kg 0.2500 14,350.00 3,587.50

2 Tenaga

Pekerja Oh 0.3900 55,000.00 Tukang batu Oh 0.1875 70,000.00 Kepala tukang Oh 0.0188 75,000.00 Mandor Oh 0.0195 80,000.00

78,864.10

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 32: RAB rumah

DIBULATKAN

78,864.10

DIBULATKAN Pekerjaan Pada Lantai 2

6 1 m² pasang dinding keramik 20 x 25 cm motif

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Ubin keramik 20x25 cm motif m² 1.0500 85,450.00 89,722.50 PC Kg 9.3000 1,400.00 13,020.00 Pasir pasang m³ 0.0180 221,200.00 3,981.60 Semen warna Kg 0.2500 14,350.00 3,587.50

2 Tenaga

Pekerja Oh 0.3900 55,000.00 Tukang batu Oh 0.1875 70,000.00 Kepala tukang Oh 0.0188 75,000.00 Mandor Oh 0.0195 80,000.00

110,311.60

DIBULATKAN

110,311.60

DIBULATKAN Pekerjaan Pada Lantai 2

7 1 m' pasang list keramik dinding t = 10 m

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

List keramik dinding t=10 cm m' 1.0500 23,450.00 24,622.50 PC Kg 1.6500 1,400.00 2,310.00 Pasir pasang m³ 0.0320 221,200.00 7,078.40 Semen warna Kg 0.1000 14,350.00 1,435.00

2 Tenaga

Pekerja Oh 0.1500 55,000.00 Tukang batu Oh 0.0500 70,000.00 Kepala tukang Oh 0.0250 75,000.00 Mandor Oh 0.0250 80,000.00

35,445.90

DIBULATKAN

35,445.90

DIBULATKAN Pekerjaan Pada Lantai 2

8 1 m' pasang list kuku macan p = 10 cm

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 33: RAB rumah

1 Bahan

Kuku macan p = 10 cm m' 10.0000 1,200.00 12,000.00 PC Kg 1.6500 1,400.00 2,310.00 Pasir pasang m³ 0.0320 221,200.00 7,078.40 Semen warna Kg 0.1000 14,350.00 1,435.00

2 Tenaga

Pekerja Oh 0.1500 55,000.00 Tukang batu Oh 0.0500 70,000.00 Kepala tukang Oh 0.0250 75,000.00 Mandor Oh 0.0250 80,000.00

22,823.40

DIBULATKAN

22,823.40

DIBULATKAN Pekerjaan Pada Lantai 2

9 1 m² pasang dinding Granit warna hitam / hijau ex Tulung Agung

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Granit warna hitam / hijau ex Tulung Agung m² 1.0200 336,700.00 343,434.00 PC Kg 12.4400 1,400.00 17,416.00 Pasir pasang m³ 0.0250 221,200.00 5,530.00 Semen warna Kg 0.2500 14,350.00 3,587.50

2 Tenaga

Pekerja Oh 0.7200 55,000.00 Tukang batu Oh 0.6500 70,000.00 Kepala tukang Oh 0.0650 75,000.00 Mandor Oh 0.0350 80,000.00

369,967.50

DIBULATKAN

369,967.50

DIBULATKAN Pekerjaan Pada Lantai 2

10 1 m² pasang dinding batu sirih / alur ( hitam dan kuning )

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Batu sirih / alur m² 1.0500 192,200.00 201,810.00 PC Kg 11.7500 1,400.00 16,450.00 Pasir pasang m³ 0.0350 221,200.00 7,742.00

2 Tenaga

Pekerja Oh 0.6200 55,000.00 Tukang batu Oh 0.3500 70,000.00 Kepala tukang Oh 0.0350 75,000.00

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 34: RAB rumah

Mandor Oh 0.0300 80,000.00 226,002.00

DIBULATKAN

226,002.00

DIBULATKAN Pekerjaan Pada Lantai 2

L Analisa biaya kontruksi Pekerjaan pengecatan

1 1 m² pengecatan tembok baru ex catylac

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Plamir Kg 0.1000 34,200.00 3,420.00 Cat dasar Kg 0.5000 26,210.00 13,105.00 Cat penutup 2 kali Kg 0.2600 26,210.00 6,814.60

2 Tenaga

Pekerja Oh 0.0200 55,000.00 Tukang cat Oh 0.0630 70,000.00 Kepala tukang Oh 0.0063 75,000.00 Mandor Oh 0.0025 80,000.00

23,339.60

DIBULATKAN

23,339.60

DIBULATKAN Pekerjaan Pada Lantai 2

2 1 m² pengecatan permukaan baja dengan cat besi

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Cat besi Kg 0.2000 67,100.00 13,420.00 minyak cat/thinner Kg 0.1000 16,500.00 1,650.00

2 Tenaga

Pekerja Oh 0.0700 55,000.00 Tukang cat Oh 0.0750 70,000.00 Kepala tukang Oh 0.0075 75,000.00 Mandor Oh 0.0025 80,000.00

15,070.00 DIBULATKAN

15,070.00 DIBULATKAN Pekerjaan Pada Lantai 2

3 1 m² pelaburan bidang kayu baru dengan politur

NO URAIAN SAT INDEKS JUMLAH ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 35: RAB rumah

NO URAIAN SAT INDEKS BAHAN

1 Bahan

Plitur ex imra Kg 0.5220 74,050.00 38,654.10 Kertas gosok Lbr 2.0000 5,100.00 10,200.00

2 Tenaga

Tukang cat Oh 0.0600 70,000.00 Kepala tukang Oh 0.0160 75,000.00 Mandor Oh 0.0025 80,000.00

48,854.10 DIBULATKAN

48,854.10

DIBULATKAN Pekerjaan Pada Lantai 2

4 1 m² pengecatan water proof

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Cat water proof Kg 0.3000 58,250.00 17,475.00 2 Tenaga

Pekerja Oh 0.0280 55,000.00 Tukang batu Oh 0.0420 70,000.00 Kepala tukang Oh 0.0042 75,000.00 Mandor Oh 0.0025 80,000.00

17,475.00 DIBULATKAN

17,475.00

DIBULATKAN Pekerjaan Pada Lantai 2

5 1 m² pengecatan dinding exterior

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Cat dinding exterior Kg 0.3000 139,020.00 41,706.00 Cat dasar exterior Kg 0.2000 80,000.00 16,000.00 Kertas gosok Lbr 0.1000 5,100.00 510.00

2 Tenaga

Pekerja Oh 0.0200 55,000.00 Tukang batu Oh 0.0630 70,000.00 Kepala tukang Oh 0.0063 75,000.00 Mandor Oh 0.0025 80,000.00

58,216.00 DIBULATKAN

58,216.00

DIBULATKAN Pekerjaan Pada Lantai 2

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

HARGA SATUAN ( Rp )

Page 36: RAB rumah

6 1 m² Coating Dof

NO URAIAN SAT INDEKS JUMLAH ( Rp )

BAHAN

1 Bahan

Coating dof Kg 0.3000 58,250.00 17,475.00 2 Tenaga

Pekerja Oh 0.0200 55,000.00 Tukang batu Oh 0.0630 70,000.00 Kepala tukang Oh 0.0063 75,000.00 Mandor Oh 0.0025 80,000.00

17,475.00 DIBULATKAN

17,475.00

DIBULATKAN Pekerjaan Pada Lantai 2

HARGA SATUAN ( Rp )

Page 37: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

366,685.00 26,640.00 393,325.00 393,325.00

393,300.00

471,990.00 471,990.00

471,950.00

Kode :

JUMLAH ( Rp )

UPAH

110,000.00 8,000.00 118,000.00 118,000.00

118,000.00

141,600.00 141,600.00

141,600.00

Kode :

JUMLAH ( Rp )

UPAH

550.00 400.00 950.00 950.00

950.00

1,140.00 1,140.00

1,100.00

Kode :

JUMLAH ( Rp )

UPAH

5,500.00 4,000.00 9,500.00 9,500.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 38: RAB rumah

9,500.00

11,400.00 11,400.00

11,400.00

Kode :

JUMLAH ( Rp )

UPAH

280,000.00 30,000.00 310,000.00 310,000.00

310,000.00

372,000.00 372,000.00

372,000.00

Kode :

JUMLAH ( Rp )

UPAH

1,190.00 13,750.00 150.00 1,040.00 16,130.00 42,755.00

42,750.00

Kode :

JUMLAH ( Rp )

UPAH

41,250.00 2,000.00 43,250.00 43,250.00

43,250.00

Kode :

JUMLAH ( Rp )

UPAH

13,750.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 39: RAB rumah

666.67 14,416.67 14,416.67

14,400.00

Kode :

JUMLAH ( Rp )

UPAH

44,000.00 4,800.00 48,800.00 138,620.00

138,600.00

Kode :

JUMLAH ( Rp )

UPAH

82,500.00 52,500.00 5,625.00 6,000.00 146,625.00 639,478.20

639,450.00

Kode :

JUMLAH ( Rp )

UPAH

42,900.00 27,300.00 2,925.00 3,120.00 76,245.00 323,821.80

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 40: RAB rumah

323,800.00

Kode :

JUMLAH ( Rp )

UPAH

16,500.00 7,000.00 750.00 1,200.00 25,450.00 124,416.00

124,400.00

30,540.00 129,506.00

129,500.00

Kode :

JUMLAH ( Rp )

UPAH

16,500.00 7,000.00 750.00 1,200.00 25,450.00 292,128.40

292,100.00

30,540.00 297,218.40

297,200.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 41: RAB rumah

16,500.00 10,500.00 1,125.00 1,200.00 29,325.00 45,299.00

45,250.00

35,190.00 51,164.00

51,150.00

Kode :

JUMLAH ( Rp )

UPAH

4,400.00 2,800.00 3,000.00 320.00 10,520.00 14,095.60

14,050.00

12,624.00 16,199.60

16,150.00

Kode :

JUMLAH ( Rp )

UPAH

385,000.00 1,470,000.00 157,500.00 28,000.00 2,040,500.00 24,254,680.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 42: RAB rumah

24,254,650.00

2,448,600.00 24,662,780.00

24,662,750.00

Kode :

JUMLAH ( Rp )

UPAH

55,000.00 210,000.00 22,500.00 4,000.00 291,500.00 1,104,887.00

1,104,850.00

349,800.00 1,163,187.00

1,163,150.00

Kode :

JUMLAH ( Rp )

UPAH

44,000.00 168,000.00 18,000.00 3,200.00 233,200.00 721,232.20

721,200.00

279,840.00 767,872.20

767,850.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 43: RAB rumah

220,000.00 840,000.00 90,000.00 16,000.00 1,166,000.00 23,678,380.00

23,678,350.00

1,399,200.00 23,911,580.00

23,911,550.00

Kode :

JUMLAH ( Rp )

UPAH

5,500.00 7,000.00 750.00 400.00 13,650.00 125,991.40

125,950.00

16,380.00 128,721.40

128,700.00

Kode :

JUMLAH ( Rp )

UPAH

6,050.00 15,400.00 1,650.00 400.00 23,500.00 61,443.53

61,400.00

28,200.00 66,143.53

66,100.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 44: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

66,000.00 14,000.00 1,500.00 4,800.00 86,300.00 788,938.00 788,938.00 39,446.90

39,400.00

39,400.00 55,225.66

55,200.00

Kode :

JUMLAH ( Rp )

UPAH

90,750.00 19,320.00 2,100.00 6,640.00 118,810.00 932,376.00

932,350.00

Kode :

JUMLAH ( Rp )

UPAH

90,750.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 45: RAB rumah

19,250.00 2,100.00 6,640.00 118,740.00 988,906.80

988,900.00

Kode :

JUMLAH ( Rp )

UPAH

385.00 490.00 52.50 24.00 951.50 13,184.00

13,150.00

Kode :

JUMLAH ( Rp )

UPAH

28,600.00 18,200.00 1,950.00 2,080.00 50,830.00 203,144.00

203,100.00

101,550.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 46: RAB rumah

28,600.00 18,200.00 1,950.00 2,080.00 50,830.00 221,632.00

221,600.00

110,800.00

Kode :

JUMLAH ( Rp )

UPAH

36,300.00 23,100.00 2,475.00 2,640.00 64,515.00 366,403.00

366,400.00

183,200.00

Kode :

JUMLAH ( Rp )

UPAH

36,300.00 23,100.00 2,475.00 2,640.00 64,515.00 377,495.80

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 47: RAB rumah

377,450.00

188,725.00

Kode :

JUMLAH ( Rp )

UPAH

36,300.00 23,100.00 2,475.00 2,640.00 64,515.00 462,803.00

462,800.00

231,400.00

Kode :

JUMLAH ( Rp )

UPAH

36,300.00 23,100.00

2,475.00

2,640.00 64,515.00 329,172.00

329,150.00

164,575.00

Kode :

JUMLAH ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 48: RAB rumah

UPAH

2,868,956.00

2,868,950.00

Kode :

JUMLAH ( Rp )

UPAH

4,467,037.50

4,467,000.00

Kode :

JUMLAH ( Rp )

UPAH

- 4,903,935.50

4,903,900.00

Kode :

JUMLAH ( Rp )

UPAH

- 4,134,360.00

4,134,350.00

Kode :

JUMLAH ( Rp )

UPAH

- 2,953,743.00

2,953,700.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 49: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

- 3,800,526.00

3,800,500.00

Kode :

JUMLAH ( Rp )

UPAH

- 4,721,311.30

4,721,300.00

Kode :

JUMLAH ( Rp )

UPAH

- 4,354,759.00 33.333 0.31 4,354,750.00 26.667 8.29

22.222 6.91 Kode :

JUMLAH ( Rp )

UPAH

- 4,001,283.00

4,001,250.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 50: RAB rumah

- 3,792,433.50

3,792,400.00

Kode :

JUMLAH ( Rp )

UPAH

- 4,162,712.42

4,162,700.00

Kode :

JUMLAH ( Rp )

UPAH

- 3,157,876.00

3,157,850.00

Kode :

JUMLAH ( Rp )

UPAH

- 3,055,124.33

3,055,100.00

Kode :

JUMLAH ( Rp )

UPAH

1,375.00 10,500.00 750.00 240.00 12,865.00 97,756.25

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 51: RAB rumah

97,750.00

Kode :

JUMLAH ( Rp )

UPAH

8,250.00 4,200.00 450.00 640.00 13,540.00 144,040.00

144,000.00

16,248.00 146,748.00

146,700.00

Kode :

JUMLAH ( Rp )

UPAH

22,000.00 14,000.00 1,500.00 1,600.00 39,100.00 137,378.40

137,350.00

46,920.00 145,198.40

145,150.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 52: RAB rumah

18,150.00 77,000.00 75.00 12,800.00 108,025.00 1,208,025.00

1,208,000.00

129,630.00 1,229,630.00

1,229,600.00

Kode :

JUMLAH ( Rp )

UPAH

5,500.00 77,000.00 8,250.00 800.00 91,550.00 902,162.00

902,150.00

109,860.00 920,472.00

920,450.00

Kode :

JUMLAH ( Rp )

UPAH

550.00 7,000.00 750.00 400.00 8,700.00 49,946.25

49,900.00

10,440.00 51,686.25

51,650.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 53: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

550.00 7,000.00 750.00 400.00 8,700.00 46,750.00

46,750.00

10,440.00 48,490.00

48,450.00

Kode : 5 Memasang 1 m' pipa PVC AW Ø 1/2"

JUMLAH ( Rp ) NO URAIAN SAT

UPAH

1 Bahan

Pipa PVC AW Ø 1/2" m' Acecoris ( 35 % dari harga pipa ) Hrg

2 Tenaga

1,980.00 Pekerja Oh 4,200.00 Tukang batu Oh 450.00 Kepala tukang Oh 144.00 Mandor Oh 6,774.00 16,924.00

16,900.00 DIBULATKAN

8,128.80 18,278.80

18,250.00 DIBULATKAN Pekerjaan Pada Lantai 2

Kode : 6 Memasang 1 m' pipa PVC kelas AW Ø 4"

JUMLAH ( Rp ) NO URAIAN SAT

UPAH

1 Bahan

Pipa kelas D Ø 4" m' Acecoris ( 35 % dari harga pipa ) Hrg

2 Tenaga

4,455.00 Pekerja Oh 9,450.00 Tukang batu Oh 105.00 Kepala tukang Oh 3,280.00 Mandor Oh

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 54: RAB rumah

17,290.00 78,540.00

78,500.00 DIBULATKAN

20,748.00 81,998.00

81,950.00 DIBULATKAN Pekerjaan Pada Lantai 2

Kode :

JUMLAH ( Rp )

UPAH

550.00 35,000.00 750.00 400.00 36,700.00 223,450.00

223,450.00

44,040.00 230,790.00

230,750.00

Kode : 2 1 buah pasang engsel pivot pintu

JUMLAH ( Rp ) NO URAIAN SAT

UPAH

1 Bahan

Engsel pivot Bh 2 Tenaga

825.00 Pekerja Oh 10,500.00 Tukang batu Oh 1,125.00 Kepala tukang Oh 64.00 Mandor Oh 12,514.00 77,514.00

77,500.00 DIBULATKAN

15,016.80 80,016.80

80,000.00 DIBULATKAN Pekerjaan Pada Lantai 2

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 55: RAB rumah

550.00 7,000.00 750.00 40.00 8,340.00 31,140.00

31,100.00

10,008.00 32,808.00

32,800.00

Kode :

JUMLAH ( Rp )

UPAH

825.00 10,500.00 1,125.00 600.00 13,050.00 58,050.00

58,050.00

15,660.00 60,660.00

60,650.00

Kode :

JUMLAH ( Rp )

UPAH

825.00 10,500.00 1,125.00 600.00 13,050.00 43,050.00

43,050.00

15,660.00 45,660.00

45,650.00

Kode : 6 1 buah pasang Handel Pintu Biasa

JUMLAH ( Rp ) NO URAIAN SAT

UPAH

1 Bahan

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 56: RAB rumah

Handel Pintu Bh 2 Tenaga

825.00 Pekerja Oh 10,500.00 Tukang batu Oh 1,125.00 Kepala tukang Oh 600.00 Mandor Oh 13,050.00 163,050.00

163,050.00 DIBULATKAN

15,660.00 165,660.00

165,650.00 DIBULATKAN Pekerjaan Pada Lantai 2

Kode :

JUMLAH ( Rp ) 6 1 buah pasang Handel Tanam

UPAH NO URAIAN SAT

1 Bahan

Handel Pintu Bh 825.00 2 Tenaga

10,500.00 Pekerja Oh 1,125.00 Tukang batu Oh 600.00 Kepala tukang Oh 13,050.00 53,050.00 Mandor Oh

53,050.00

15,660.00 55,660.00 DIBULATKAN

55,650.00

DIBULATKAN Pekerjaan Pada Lantai 2

Kode :

JUMLAH ( Rp )

UPAH

825.00 10,500.00 1,125.00 60.00 12,510.00 137,800.00

137,800.00

15,012.00 140,302.00

140,300.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 57: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

14,300.00 8,750.00 937.50 1,040.00 25,027.50 115,677.50

115,650.00

30,033.00 120,683.00

120,650.00

Kode :

JUMLAH ( Rp )

UPAH

14,300.00 9,100.00 975.00 1,040.00 25,415.00 104,021.50

104,000.00

30,498.00 109,104.50

109,100.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 58: RAB rumah

13,750.00 8,750.00 975.00 1,040.00 24,515.00 134,341.50

134,300.00

29,418.00 139,244.50

139,200.00

Kode :

JUMLAH ( Rp )

UPAH

13,750.00 8,750.00 975.00 1,040.00 24,515.00 228,554.50

228,550.00

29,418.00 233,457.50

233,450.00

Kode :

JUMLAH ( Rp )

UPAH

21,450.00 13,125.00 1,406.25 1,560.00 37,541.25 116,405.35

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 59: RAB rumah

116,400.00

45,049.50 123,913.60

123,900.00

Kode :

JUMLAH ( Rp )

UPAH

21,450.00 13,125.00 1,406.25 1,560.00 37,541.25 147,852.85

147,850.00

45,049.50 155,361.10

155,350.00

Kode :

JUMLAH ( Rp )

UPAH

8,250.00 3,500.00 1,875.00 2,000.00 15,625.00 51,070.90

51,050.00

18,750.00 54,195.90

54,150.00

Kode :

JUMLAH ( Rp )

UPAH

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 60: RAB rumah

8,250.00 3,500.00 1,875.00 2,000.00 15,625.00 38,448.40

38,400.00

18,750.00 41,573.40

41,550.00

Kode :

JUMLAH ( Rp )

UPAH

39,600.00 45,500.00 4,875.00 2,800.00 92,775.00 462,742.50

462,700.00

111,330.00 481,297.50

481,250.00

Kode :

JUMLAH ( Rp )

UPAH

34,100.00 24,500.00 2,625.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 61: RAB rumah

2,400.00 63,625.00 289,627.00

289,600.00

76,350.00 302,352.00

302,350.00

Kode :

JUMLAH ( Rp )

UPAH

1,100.00 4,410.00 472.50 200.00 6,182.50 29,522.10

29,500.00

7,419.00 30,758.60

30,750.00

Kode : JUMLAH ( Rp )

UPAH

3,850.00 5,250.00 562.50 200.00 9,862.50 24,932.50

24,900.00

11,835.00 26,905.00 26,900.00

Kode :

JUMLAH ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 62: RAB rumah

UPAH

4,200.00 1,200.00 200.00 5,600.00 54,454.10

54,450.00

6,720.00 55,574.10

55,550.00

Kode :

JUMLAH ( Rp )

UPAH

1,540.00 2,940.00 315.00 200.00 4,995.00 22,470.00

22,450.00

5,994.00 23,469.00

23,450.00

Kode :

JUMLAH ( Rp )

UPAH

1,100.00 4,410.00 472.50 200.00 6,182.50 64,398.50

64,350.00

7,419.00 65,635.00

65,600.00

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

JUMLAH TOTAL ( Rp )

Page 63: RAB rumah

Kode :

JUMLAH ( Rp )

UPAH

1,100.00 4,410.00 472.50 200.00 6,182.50 23,657.50

23,650.00

7,419.00 24,894.00

24,850.00

JUMLAH TOTAL ( Rp )

Page 64: RAB rumah

Kode :

INDEKS JUMLAH ( Rp )

BAHAN UPAH

1.0500 6,000.00 6,300.00 0.3500 6,000.00 2,100.00

0.0360 55,000.00 1,980.00 0.0600 70,000.00 4,200.00 0.0060 75,000.00 450.00 0.0018 80,000.00 144.00

8,400.00 6,774.00 15,174.00

15,150.00

8,400.00 8,128.80 16,528.80

DIBULATKAN Pekerjaan Pada Lantai 2 16,500.00

Kode :

INDEKS JUMLAH ( Rp )

BAHAN UPAH

1.0500 65,000.00 68,250.00 0.3500 65,000.00 22,750.00

0.0810 55,000.00 4,455.00 0.1350 70,000.00 9,450.00 0.0014 75,000.00 105.00 0.0410 80,000.00 3,280.00

HARGA SATUAN

( Rp ) JUMLAH TOTAL

( Rp )

HARGA SATUAN

( Rp ) JUMLAH TOTAL

( Rp )

Page 65: RAB rumah

91,000.00 17,290.00 108,290.00

108,250.00

91,000.00 20,748.00 111,748.00

DIBULATKAN Pekerjaan Pada Lantai 2 111,700.00

Kode :

INDEKS JUMLAH ( Rp )

BAHAN UPAH

1.0000 75,000.00 75,000.00

0.0150 55,000.00 825.00 0.1500 70,000.00 10,500.00 0.0150 75,000.00 1,125.00 0.0008 80,000.00 64.00

75,000.00 12,514.00 87,514.00

87,500.00

75,000.00 15,016.80 90,016.80

DIBULATKAN Pekerjaan Pada Lantai 2 90,000.00

HARGA SATUAN

( Rp ) JUMLAH TOTAL

( Rp )

Page 66: RAB rumah

Kode :

INDEKS JUMLAH ( Rp )

BAHAN UPAH

HARGA SATUAN

( Rp ) JUMLAH TOTAL

( Rp )

Page 67: RAB rumah

1.0000 80,000.00 80,000.00

0.0150 55,000.00 825.00 0.1500 70,000.00 10,500.00 0.0150 75,000.00 1,125.00 0.0075 80,000.00 600.00

80,000.00 13,050.00 93,050.00

93,050.00

80,000.00 15,660.00 95,660.00

DIBULATKAN Pekerjaan Pada Lantai 2 95,650.00

Kode :

INDEKS JUMLAH ( Rp )

BAHAN UPAH

1.0000 55,000.00 55,000.00

0.0150 70,000.00 1,050.00 0.1500 75,000.00 11,250.00 0.0150 80,000.00 1,200.00 0.0075 - -

55,000.00 13,500.00 68,500.00

68,500.00

55,000.00 16,200.00 71,200.00

DIBULATKAN Pekerjaan Pada Lantai 2 71,200.00

HARGA SATUAN

( Rp ) JUMLAH TOTAL

( Rp )

Page 68: RAB rumah

VOLUME PEKERJAAN

A Analisa biaya kontruksi pekerjaan persiapan dan tanah

1 m³ Bongkaran beton bertulangkolombalokgunungan

2 m³ Bongkaran dinding tembok batu bata3 m² Menurunkan genting, genting tidak dipakai lagi4 m² Menurunkan rangka penutup atap (usuk+reng), bongkaran tidak dipakai lagi 5 m³ Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran tidak dipakai lagi 6 m² Pembuatan stegger bambu untuk andang7 m³ Galian tanah biasa sedalam 1 meter8 m³ Urugan tanah kembali9 m³ Urugan Tanah dipadatkan dengan Tenaga buruh

B Analisa biaya kontruksi Pekerjaan pondasi

1 m³ Pasang pondasi batu kali, 1 PC : 6 Ps P5 =P6 =P7 =P8 =

2 m³ Pasang pondasi batu kosong / Aanstampeng P5 =P6 =P7 =P8 =P9 =

C Analisa biaya kontruksi Pekerjaan pasangan dinding

1 m² Pasangan Batu bata tebal ½ bata, 1 PC : 3 Ps

2 m² Pasangan dinding roster/krawangan 11 x 15 x 22

D Analisa biaya kontruksi Pekerjaan plesteran

1 m² Plesteran 1PC : 3Ps tebal 15 mm

2 m² Plesteran sekoning ( Benangan ) 1PC : 2Ps

E Analisa biaya kontruksi Pekerjaan kayu

Page 69: RAB rumah

1 m³ Pasang Kusen Pintu dan Jendela Kayu Jati

2 m² Pasang Daun Pintu Panel Kayu Jati

3 m² Pasang Daun Jendela Kaca Kayu Jati

4 m³ Pasang Kontruksi Kuda-Kuda Kayu jati

5 m² Pasang kaso Jati 5/7 + reng Jati genteng keramik 6 m' Pasang lisplang GRC t = 9 mm, lebar 20 cm

F Analisa biaya kontruksi Pekerjaan beton

1 m² Beton rabat2 m³ Membuat Platpor 60/60/30

3 m³ Membuat sloof 15/254 m³ Membuat kolom praktis 11/11

5 m³ Membuat kolom 15/15

6 m³ Membuat kolom 15/25

7 m³ Membuat kolom 15/30

8 m³ Membuat ring balok praktis 12/15

9 m³ Membuat beton balok 15/159 m³ Membuat beton balok 15/20

10 m³ Membuat beton balok 15/25

Page 70: RAB rumah

11 m³ Membuat beton balok 15/3512 m³ Membuat beton Plat lantai t.12 cm

13 m³ Membuat beton Plat atap t.8 cm

14 m³ Membuat beton Plat tangga t.10 cm15 m² Pasang paving block

G Analisa biaya kontruksi Pekerjaan penutup atap

1 m² Pasang atap genteng keramik / glazur2 m' Pasang genteng bubungan keramik / glazur

H Analisa biaya kontruksi Pekerjaan langit - langit

1 m² Pasang plafond gypsum

I Analisa biaya kontruksi Pekerjaan pipa dan sanitasi

1 Memasang closed duduk + acc ex INA

2 Memasang wastafel kecil ex INA

3 Memasang kran diameter ½ atau ¾

4 Memasang floor drain stainless stel

5 Memasang 1 m' pipa PVC AW Ø 3/4"

6 Memasang 1 m' pipa PVC kelas AW Ø 3"

7 Memasang shower

8 Memasang shower box

J Analisa biaya kontruksi Pekerjaan Penutup lantai

1 m² pasang lantai keramik 20 x 20 cm motif

2 m² pasang lantai keramik 30 x 30 cm motif

3 m² pasang lantai keramik 40 x 40 cm motif

4 m² pasang lantai ubin granit cream 60 x 60 cm ex Cina

5 m² pasang dinding keramik 20 x 25 cm polos

Page 71: RAB rumah

6 m² pasang dinding keramik 20 x 25 cm motif

7 m' pasang list keramik dinding t = 10 m

8 m' pasang list kuku macan p = 10 cm

9 m² pasang dinding Granit warna hitam / hijau ex Tulung Agung

10 m² pasang dinding batu sirih / alur ( hitam dan kuning )

K Analisa biaya kontruksi Pekerjaan pengecatan

1 m² pengecatan tembok baru ex catylac

2 m² pengecatan permukaan baja dengan cat besi

3 m² pelaburan bidang kayu baru dengan politur

4 m² pengecatan water proof

5 m² pengecatan dinding exterior

6 m² Coating Dof

L Analisa biaya kontruksi Pekerjaan kunci dan kaca

1 Pasang kunci tanam ex. Yale

2 Pasang engsel pintu

3 Pasang engsel jendela

4 Pasang Grendel Pintu

5 Pasang Handel Pintu

6 Pasang kait angin

7 m² pasang kaca rayband, tebal 5 mm

8 Kusen Alluminium 4" Putih ex alexindo9 Pagar Hollow 4cm jarak 6cm

L Analisa biaya elektrikal

1 Pasang fitting

Page 72: RAB rumah

2 Pasang stop kontak

3 Pasang saklar

4 Pasang meteran

5 Pasang MCB

6 Pasang stop kontak AC

7 Pasang Kabel NYA (3)

Page 73: RAB rumah

VOLUME PEKERJAAN

1.01251.2375

1.1253.375

12 m³78

46.80.0875 m³

4.78.064 m³2.016 m³

13.5 m³

bh1/2 x ((0.23+0.4)*0.65 = 0.20475 x 0.6 = 0.12285 x 10 = 1.2285 m³1/2 x ((0.3+0.65)*0.65 = 0.30875 x 0.6 = 0.18525 x 4 = 0.741 m³1/2 x ((0.23+0.4)*0.65 = 0.20475 x 0.4 = 0.0819 x 7 = 0.5733 m³1/2 x ((0.83+1.18)*0.65 = 0.65325 x 0.4 = 0.2613 x 1 = 0.2613 m³

2.8041 m³

0.4 x 0.2 x 0.65 = 0.052 x 10 = 0.52 m³0.65 x 0.2 x 0.65 = 0.0845 x 4 = 0.338 m³0.4 x 0.2 x 0.4 = 0.032 x 7 = 0.224 m³1.18 x 0.2 x 0.65 = 0.1534 x 1 = 0.1534 m³0.95 x 0.5 x 0.3 = 0.1425 m³

1.3779 m³

Lt. 1 = 229.65Lt. 2 = 182.41Lt. 1 = 17 bh =Lt. 2 = 22 bh =

Lt. 1 301.43Lt. 2 318.17Lt. 1 6.5565Lt. 2 6.3435

m²m²

m²m²

Page 74: RAB rumah

Lt. 1 0.16116Lt. 2 0.132Lt. 1 9.72Lt. 2 1.47Lt. 1 0.6Lt. 2 1.7Lt. 2 Kuda2 17.3 0.16608 x 4 0.664 m³ 0.574848

1/2 Kuda2 0.08304 x 2 0.166 m³ 0.1620480.83 m³ 0.736896

Lt. 2 67.5Lt. 2

P1 0.102 x 2 = 0.204P2 0.102 x 6 = 0.612P3 0.217 x 4 = 0.867P4 0.102 x 2 = 0.204P9 0.076 x 1 = 0.076

1.96377.58 m x 0.0375 = 2.909

Lt. 1 = 0.135Lt. 2 = 0.234

0.369Lt. 1 = 1.002 t = 3.71 m

0.560 t = 3.11 m0.128 t = 1.9 m

Lt. 2 = 0.581 t = 3.23 m0.050 t = 1.1 m0.020 t = 0.45 m0.074 t = 0.3 m2.415

Lt. 1 = 1.391 t = 3.71 mLt. 2 = 0.969 t = 3.23 m

2.360Lt. 1 = 0.334 t = 3.71 mLt. 2 = 0.291 t = 3.23 m

0.625Lt. 1 = 1.008Lt. 2 = 0.597

1.605Lt. 2 = 1.020Lt. 1 = 1.483Lt. 2 = 1.268

2.751Lt. 1 = 0.214

Page 75: RAB rumah

Lt. 1 = 0.2395.0232 t = 12 cm

0.75 t = 10 cm5.77322.0424 t = 8 cm0.0792 t = 6 cm2.1216

0.445

Lt. 2Lt. 2

Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 2

Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1

Page 76: RAB rumah

Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2

Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2

Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2Lt. 1Lt. 2

Lt. 1

Page 77: RAB rumah

Lt. 2 k2 k3Lt. 1 Lt. Atas 3.1 1.2 Lt. BawahLt. 2 3.9 16.1Lt. 1 2.6 19.2Lt. 2 2.5 36.5Lt. 1 0.9Lt. 2 2Lt. 1 4.3Lt. 2 3.6Lt. 1 14.4Lt. 2 37.3Lt. 1Lt. 2

Page 78: RAB rumah

Pintu Utama = 2.32 Jendela kmr = 0.19

Page 79: RAB rumah

Pintu Garasi = 5.08Atas

Pintu belakang = 2.4 Jendela Balkon = 0.389.99 Jendela Kamar = 1.32

1.7

Pintu Utama = 0.07488 Jendela kmr = 0.0264Bv 0.01188

AtasPintu belakang = 0.048 Jendela Balkon = 0.0528

0.16116 Jendela Kamar = 0.07920.132

Page 80: RAB rumah

k2 k310.5

0

10.5

Page 81: RAB rumah

Rencana Anggaran Biaya Rumah

Perencanaan & Perancangan Rumah MinimalisIbu Nur Syamsiah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalA Pekerjaan Persiapan dan Tanah

1 Bongkaran beton bertulang 3.38 m³ 393,300.00 1,327,387.50

2 Bongkaran dinding tembok bata 12.00 m³ 118,000.00 1,416,000.00

3 Menurunkan genting, tidak dipakai lagi 78 m² 950.00 74,100.00

4 Membongkar usuk+reng, tidak dipakai lagi 46.8 m² 9,500.00 444,600.00

5 Membongkar kuda - kuda, tidak dipakai lagi 0.0875 m³ 310,000.00 27,125.00

6 Pembuatan stegger bambu untuk andang 4.7 m² 42,750.00 200,925.00

7 Galian tanah untuk pondasi sedalam 1 m 8.06 m³ 43,250.00 348,768.00

8 Urugan kembali bekas galian 2.02 m³ 14,400.00 29,030.40

9 Urugan Tanah dipadatkan dengan Tenaga buruh 13.50 m³ 138,600.00 1,871,100.00

Sub total 5,739,035.90 5,739,000.00

B Pekerjaan Pondasi Batu Kali

1 Pasang pondasi batu kali, 1 PC : 6 Ps 2.80 m³ 639,450.00 1,793,081.74

2 Pasang pondasi batu kosong / Aanstampeng 1.38 m³ 323,800.00 446,164.02

Sub total 2,239,245.76 2,239,200.00

C Pekerjaan Pasangan Dinding

1 Pasangan batu bata tebal ½ bata, 1 PC : 3 Ps Lt. 1 229.65 m² 124,400.00 28,568,460.00

Lt. 2 182.41 m² 129,500.00 23,622,095.00

Sub total 52,190,555.00 52,190,550.00

D Pekerjaan Plesteran

1 Plesteran 1PC : 3Ps tebal 15 mm Lt. 1 301.43 m² 45,250.00 13,639,707.50

Lt. 2 318.17 m² 51,150.00 16,274,395.50

2 Plesteran sekoning ( Benangan ) 1PC : 2Ps Lt. 1 6.56 m² 14,050.00 92,118.83

Lt. 2 6.34 m² 16,150.00 102,447.53

Sub total 30,108,669.35 30,108,650.00

E Pekerjaan Kayu

1 Pasang loster kayu 20 x 30 x 20 Lt. 1 17.00 bh 25,000.00 425,000.00

Lt. 2 22.00 bh 25,600.00 563,200.00

2 Pasang Kusen Pintu dan Jendela Kayu Jati Lt. 1 0.16 m³ 24,254,650.00 3,908,879.39

Lt. 2 0.13 m³ 24,662,750.00 3,255,483.00

3 Pasang Daun Pintu Panel Kayu Jati Lt. 1 9.99 m² 1,104,850.00 11,037,451.50

4 Pasang Daun Jendela Kayu Jati Lt. 1 0.19 m² 721,200.00 137,028.00

Lt. 2 1.70 m² 767,850.00 1,305,345.00

5 Pasang Kontruksi Kuda-Kuda Kayu jati Lt. 2 0.74 m³ 23,911,550.00 17,620,325.55

6 Pasang kaso Jati 5/7 + reng Jati 3/5 genteng keramik Lt. 2 67.50 m² 128,700.00 8,687,250.00

Sub total 46,939,962.44 46,939,950.00

F Pekerjaan Beton

1 Beton rabat t=5 cm 11.40 m² 39,400.00 449,160.00

2 Membuat Platpor 60/60/30 1.96 m³ 2,868,950.00 5,631,748.85

3 Membuat sloof 15/25 2.91 m³ 4,467,000.00 12,995,619.75

4 Membuat kolom praktis 11/11 0.37 m³ 4,903,900.00 1,810,377.67

5 Membuat kolom 15/15 2.42 m³ 4,134,350.00 9,985,075.40

6 Membuat kolom 15/25 2.36 m³ 2,953,700.00 6,971,470.42

7 Membuat kolom 15/30 0.62 m³ 3,800,500.00 2,373,792.30

8 Membuat ring balok praktis 12/15 1.61 m³ 4,721,300.00 7,578,819.61

9 Membuat beton balok 15/15 1.02 m³ 4,538,025.00 4,628,445.15

10 Membuat beton balok 15/20 2.75 m³ 4,354,750.00 11,978,610.83

11 Membuat beton balok 15/25 0.21 m³ 4,001,250.00 855,267.19

12 Membuat beton balok 15/35 0.24 m³ 3,792,400.00 905,909.55

13 Membuat beton Plat lantai t.12 cm 5.77 m³ 4,162,700.00 24,032,099.64

14 Membuat beton Plat atap t.8 cm 2.12 m³ 3,157,850.00 6,699,694.56

15 Membuat beton Plat tangga t.10 cm 0.445 m³ 3,055,100.00 1,359,519.50

16 Pasang paving block 3 m² 97,750.00 293,250.00

Sub total 98,548,860.42 98,548,850.00

G Pekerjaan Penutup Atap

1 Pasang atap genteng keramik / glazur 67.50 m² 146,700.00 9,902,250.00

2 Pasang genteng bubungan keramik / glazur 23.00 m 145,150.00 3,338,450.00

Sub total 13,240,700.00 13,240,700.00

H Pekerjaan Pipa dan Sanitasi

1 Memasang closed duduk + acc Lt. 1 1.00 bh 1,208,000.00 1,208,000.00

Lt. 2 2.00 bh 1,229,600.00 2,459,200.00

2 Memasang wastafel Lt. 1 1.00 bh 902,150.00 902,150.00

Lt. 2 1.00 bh 920,450.00 920,450.00

3 Memasang kran minimalis diameter ½ Lt. 1 3.00 bh 43,750.00 131,250.00

kran biasa diameter ½ Lt. 1 2.00 bh 31,250.00 62,500.00

kran wastafel diameter ½ 1.00 bh 100,000.00 100,000.00

kran cuci piring diameter ½ 1.00 bh 100,000.00 100,000.00

kran minimalis diameter ½ Lt. 2 6.00 bh 44,450.00 266,700.00

Page 82: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah Total kran wastafel diameter ½ 1.00 bh 101,600.00 101,600.00

4 Memasang stop kran Lt 2 2.00 bh 31,750.00 63,500.00

5 Memasang floor drain stainless stel Lt. 1 1.00 bh 46,750.00 46,750.00

Lt. 2 3.00 bh 48,450.00 145,350.00

6 Memasang 1 m' pipa PVC AW Ø 1/2" Lt. 1 9.65 m 15,150.00 146,197.50

Lt. 2 10.45 m 16,500.00 172,425.00

7 Memasang 1 m' pipa PVC AW Ø 3/4" Lt. 1 26.85 m 16,900.00 453,765.00

Lt. 2 7.50 m 18,250.00 136,875.00

8 Memasang 1 m' pipa PVC AW Ø 3" (Air Talang & Air Kotor) Lt. 1 79.50 m 78,500.00 6,240,750.00

Lt. 2 28.00 m 81,950.00 2,294,600.00

9 Memasang 1 m' pipa PVC AW Ø 4" (Air Tinja) Lt. 1 15.50 m 108,250.00 1,677,875.00

Lt. 2 6.35 m 111,700.00 709,295.00

10 Memasang shower Lt. 1 1.00 bh 100,000.00 100,000.00

KM Dalam 1.00 bh 225,000.00 225,000.00

Lt. 2 1.00 bh 101,600.00 101,600.00

11 Memasang shower box Lt. 2 1.00 bh 3,800,000.00 3,800,000.00

12 Memasang tandon air stainless steel 1200 L Lt. 2 1.00 bh 3,750,000.00 3,750,000.00

13 Memasang pintu PVC Lt. 1 1.00 bh 155,000.00 155,000.00

Lt. 2 2.00 bh 165,000.00 330,000.00

Sub total 26,800,832.50 26,800,800.00

I Pekerjaan Penutup Lantai

1 Pasang lantai keramik 20 x 20 cm motif Lt. 1 3.43 m² 115,650.00 396,679.50

Lt. 2 5.67 m² 120,650.00 684,085.50

2 Pasang lantai keramik 30 x 30 cm motif Lt. 1 12.02 m² 104,000.00 1,250,080.00

Lt. 2 2.21 m² 109,100.00 241,111.00

3 Pasang lantai keramik 40 x 40 cm motif Lt. 1 19.10 m² 134,300.00 2,565,130.00

Lt. 2 34.70 m² 139,200.00 4,830,240.00

4 Pasang lantai ubin granit cream 60 x 60 cm ex Cina Lt. 1 39.60 m² 228,550.00 9,050,580.00

Lt. 2 11.90 m² 233,450.00 2,778,055.00

5 Pasang dinding keramik 20 x 25 cm polos Lt. 1 8.22 m² 116,400.00 956,808.00

Lt. 2 10.28 m² 123,900.00 1,273,692.00

6 Pasang dinding keramik 20 x 25 cm motif Lt. 1 6.79 m² 147,850.00 1,004,640.75

Lt. 2 11.86 m² 155,350.00 1,842,451.00

7 Pasang list keramik dinding t = 10 m Lt. 1 8.50 m² 51,050.00 433,925.00

Lt. 2 6.00 m² 54,150.00 324,900.00

8 Pasang list kuku macan p = 10 cm Lt. 1 13.70 m 38,400.00 526,080.00

Lt. 2 2.21 m 41,550.00 91,825.50

9 Pasang dinding Granit warna hitam (wastafel) Lt. 2 0.56 m² 481,250.00 269,500.00

10 Pasang dinding batu sirih / alur ( hitam dan kuning ) Lt. 1 1.35 m² 289,600.00 390,960.00

Lt. 2 0.48 m² 302,350.00 145,128.00

Sub total 29,055,871.25 29,055,850.00

J Analisa biaya kontruksi Pekerjaan pengecatan

1 Pengecatan tembok baru ex catylac Lt. 1 238.05 m² 29,500.00 7,022,475.00

Lt. 2 286.39 m² 30,750.00 8,806,492.50

2 Pengecatan permukaan baja dengan cat besi Lt. 1 15.03 m² 24,900.00 374,197.20

Lt. 2 8.37 m² 26,900.00 225,206.80

3 Pelaburan bidang kayu baru dengan politur Lt. 1 31.17 m² 54,450.00 1,697,206.50

Lt. 2 m² 55,550.00 0.00

4 Pengecatan water proof Lt. 2 22.75 m² 23,450.00 533,487.50

5 Pengecatan dinding exterior Lt. 1 63.38 m² 64,350.00 4,078,503.00

Lt. 2 31.78 m² 65,600.00 2,084,768.00

6 Coating Dof Lt. 1 1.35 m² 23,650.00 31,927.50

Lt. 2 0.48 m² 24,850.00 11,928.00

Sub total 24,866,192.00 24,866,150.00

K Pekerjaan langit – langit / plafon

1 Pasang plafond gypsum rangka hollow+list 108.63 m² 120,000.00 13,035,600.00

Sub total 13,035,600.00 13,035,600.00

L Pekerjaan Kunci dan Kaca

1 Pasang engsel pintu Lt. 1 20.00 bh 77,500.00 1,550,000.00

Lt. 2 6.00 bh 80,000.00 480,000.00

2 Pasang engsel pivot 4.00 bh 87,500.00 350,000.00

3 Pasang rail pintu geser 1.00 bh 528,000.00 528,000.00

4 Pasang engsel jendela Lt. 1 2.00 bh 31,100.00 62,200.00

Lt. 2 12.00 bh 32,800.00 393,600.00

5 Pasang grendel pintu 12.00 bh 58,050.00 696,600.00

6 Pasang handel pintu utama 6.00 bh 163,050.00 978,300.00

7 Pasang handel pintu biasa Lt. 1 1.00 bh 93,050.00 93,050.00

Lt. 2 3.00 bh 95,650.00 286,950.00

8 Pasang handel tanam pintu geser 1.00 bh 48,000.00 48,000.00

9 Pasang kait angin Lt. 1 1.00 bh 53,050.00 53,050.00

Lt. 2 6.00 bh 55,650.00 333,900.00

10 Pasang kaca rayband, tebal 5 mm Lt. 1 4.33 m² 137,800.00 596,674.00

Lt. 2 3.96 m² 140,300.00 556,008.90

11 Kusen Alluminium 4" Putih ex alexindo 9.84 m 75,000.00 738,000.00

12 Pagar Hollow 4x4 cm, Jari-jari 2x4 cm 16.08 m² 325,000.00 5,226,000.00

Page 83: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalSub total 12,970,332.90 12,970,300.00

Page 84: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalM Pekerjaan Elektrikal

1 Pemasangan MCB+kotak 2.00 bh 85,000.00 170,000.00

2 Instalasi pipa kabel pvc 1/2" 168.50 m 3,250.00 547,625.00

3 Kabel NYM - HY 2 " GOAL " 1 roll = 50m 4.00 roll 85,000.00 340,000.00

4 Lampu SL 8 watt 4.00 bh 27,500.00 110,000.00

5 Lampu SL 14 watt 5.00 bh 36,600.00 183,000.00

6 Lampu SL 18 watt 2.00 bh 40,700.00 81,400.00

7 Lampu SL 5 watt 12.00 bh 25,000.00 300,000.00

8 Lampu hias 30 watt 1.00 bh 150,000.00 150,000.00

9 Lampu Dop (bolamp) 5 watt 10.00 bh 1,500.00 15,000.00

10 Lampu taman 25 watt 2.00 bh 65,000.00 130,000.00

11 Downlight ex China 5" 15.00 bh 38,750.00 581,250.00 12 Fitting lampu 16.00 bh 25,000.00 400,000.00 13 Saklar tunggal ex Brocco 5.00 bh 13,750.00 68,750.00 14 Saklar ganda ex Brocco 10.00 bh 19,350.00 193,500.00 15 Stop kontak 13.00 bh 17,000.00 221,000.00 16 Stop kontak AC 3.00 bh 64,500.00 193,500.00 17 Tenaga ME listrik pasang MCB 2.00 titik 50,000.00 100,000.00 18 Tenaga ME listrik pasang fitting lampu 33.00 titik 15,000.00 495,000.00 19 Tenaga ME listrik pasang stop kontak 16.00 titik 25,000.00 400,000.00 20 Tenaga ME listrik pasang saklar 15.00 titik 25,000.00 375,000.00

Sub total 5,055,025.00 5,055,000.00 TOTAL 360,790,600.00

Dibulatkan 360,790,000.00

Terbilang : Tiga Ratus Tujuh Puluh Sembilan Juta Empat Ratus Lima Puluh Tiga Ribu Rupiah

Page 85: RAB rumah

Rencana Anggaran Biaya Rumah

Perencanaan & Perancangan Rumah MinimalisIbu Nur Syamsiah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalA Pekerjaan Persiapan dan Tanah

1 Bongkaran beton bertulang 3.00 m³ 393,300.00 1,179,900.00

2 Bongkaran dinding tembok bata 10.00 m³ 118,000.00 1,180,000.00

3 Menurunkan genting, tidak dipakai lagi 70 m² 950.00 66,500.00

4 Membongkar usuk+reng, tidak dipakai lagi 40 m² 9,500.00 380,000.00

5 Membongkar kuda - kuda, tidak dipakai lagi 0.08 m³ 310,000.00 24,800.00

6 Pembuatan stegger bambu untuk andang 4 m² 42,750.00 171,000.00

7 Galian tanah untuk pondasi sedalam 1 m 8.06 m³ 43,250.00 348,768.00

8 Urugan kembali bekas galian 2.02 m³ 14,400.00 29,030.40

9 Urugan Tanah dipadatkan dengan Tenaga buruh 12.00 m³ 138,600.00 1,663,200.00

Sub total 5,043,198.40 5,043,150.00

B Pekerjaan Pondasi Batu Kali

1 Pasang pondasi batu kali, 1 PC : 6 Ps 2.80 m³ 639,450.00 1,793,081.74

2 Pasang pondasi batu kosong / Aanstampeng 1.38 m³ 323,800.00 446,164.02

Sub total 2,239,245.76 2,239,200.00

C Pekerjaan Pasangan Dinding

1 Pasangan batu bata tebal ½ bata, 1 PC : 3 Ps Lt. 1 229.65 m² 124,400.00 28,568,460.00

Lt. 2 182.41 m² 129,500.00 23,622,095.00

Sub total 52,190,555.00 52,190,550.00

D Pekerjaan Plesteran

1 Plesteran 1PC : 3Ps tebal 15 mm Lt. 1 301.43 m² 45,250.00 13,639,707.50

Lt. 2 318.17 m² 51,150.00 16,274,395.50

2 Plesteran sekoning ( Benangan ) 1PC : 2Ps Lt. 1 6.56 m² 14,050.00 92,118.83

Lt. 2 6.34 m² 16,150.00 102,447.53

Sub total 30,108,669.35 30,108,650.00

E Pekerjaan Kayu

1 Pasang loster kayu 20 x 30 x 20 Lt. 1 17.00 bh 25,000.00 425,000.00

Lt. 2 22.00 bh 25,600.00 563,200.00

2 Pasang Kusen Pintu dan Jendela Kayu Jati Lt. 1 0.16 m³ 24,254,650.00 3,908,879.39

Lt. 2 0.13 m³ 24,662,750.00 3,255,483.00

3 Pasang Daun Pintu Panel Kayu Jati Lt. 1 9.99 m² 1,104,850.00 11,037,451.50

4 Pasang Daun Jendela Kayu Jati Lt. 1 0.19 m² 721,200.00 137,028.00

Lt. 2 1.70 m² 767,850.00 1,305,345.00

5 Pasang Kontruksi Atap Baja Ringan Lt. 2 67.50 m³ 220,000.00 14,850,000.00

Sub total 35,482,386.89 35,482,350.00

F Pekerjaan Beton

1 Beton rabat t=5 cm 11.40 m² 39,400.00 449,160.00

2 Membuat Platpor 60/60/30 1.96 m³ 2,868,950.00 5,631,748.85

3 Membuat sloof 15/25 2.91 m³ 4,467,000.00 12,995,619.75

4 Membuat kolom praktis 11/11 0.37 m³ 4,903,900.00 1,810,377.67

5 Membuat kolom 15/15 2.42 m³ 4,134,350.00 9,985,075.40

6 Membuat kolom 15/25 2.36 m³ 2,953,700.00 6,971,470.42

7 Membuat kolom 15/30 0.62 m³ 3,800,500.00 2,373,792.30

8 Membuat ring balok praktis 12/15 1.61 m³ 4,721,300.00 7,578,819.61

9 Membuat beton balok 15/15 1.02 m³ 4,538,025.00 4,628,445.15

10 Membuat beton balok 15/20 2.75 m³ 4,354,750.00 11,978,610.83

11 Membuat beton balok 15/25 0.21 m³ 4,001,250.00 855,267.19

12 Membuat beton balok 15/35 0.24 m³ 3,792,400.00 905,909.55

13 Membuat beton Plat lantai t.12 cm 5.77 m³ 4,162,700.00 24,032,099.64

14 Membuat beton Plat atap t.8 cm 2.12 m³ 3,157,850.00 6,699,694.56

15 Membuat beton Plat tangga t.10 cm 0.445 m³ 3,055,100.00 1,359,519.50

16 Pasang paving block 3 m² 97,750.00 293,250.00

Sub total 98,548,860.42 98,548,850.00

G Pekerjaan Penutup Atap

1 Pasang atap genteng keramik / glazur 67.50 m² 146,700.00 9,902,250.00

2 Pasang genteng bubungan keramik / glazur 23.00 m 145,150.00 3,338,450.00

Sub total 13,240,700.00 13,240,700.00

H Pekerjaan Pipa dan Sanitasi

1 Memasang closed duduk + acc Lt. 1 1.00 bh 1,208,000.00 1,208,000.00

Lt. 2 2.00 bh 1,229,600.00 2,459,200.00

2 Memasang wastafel Lt. 1 1.00 bh 902,150.00 902,150.00

Lt. 2 1.00 bh 920,450.00 920,450.00

3 Memasang kran minimalis diameter ½ Lt. 1 3.00 bh 43,750.00 131,250.00

kran biasa diameter ½ Lt. 1 2.00 bh 31,250.00 62,500.00

kran wastafel diameter ½ 1.00 bh 100,000.00 100,000.00

kran cuci piring diameter ½ 1.00 bh 100,000.00 100,000.00

kran minimalis diameter ½ Lt. 2 6.00 bh 44,450.00 266,700.00

Page 86: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah Total kran wastafel diameter ½ 1.00 bh 101,600.00 101,600.00

4 Memasang stop kran Lt 2 2.00 bh 31,750.00 63,500.00

5 Memasang floor drain stainless stel Lt. 1 1.00 bh 46,750.00 46,750.00

Lt. 2 3.00 bh 48,450.00 145,350.00

6 Memasang 1 m' pipa PVC AW Ø 1/2" Lt. 1 9.65 m 15,150.00 146,197.50

Lt. 2 10.45 m 16,500.00 172,425.00

7 Memasang 1 m' pipa PVC AW Ø 3/4" Lt. 1 26.85 m 16,900.00 453,765.00

Lt. 2 7.50 m 18,250.00 136,875.00

8 Memasang 1 m' pipa PVC AW Ø 3" (Air Talang & Air Kotor) Lt. 1 79.50 m 78,500.00 6,240,750.00

Lt. 2 28.00 m 81,950.00 2,294,600.00

9 Memasang 1 m' pipa PVC AW Ø 4" (Air Tinja) Lt. 1 15.50 m 108,250.00 1,677,875.00

Lt. 2 6.35 m 111,700.00 709,295.00

10 Memasang shower Lt. 1 1.00 bh 100,000.00 100,000.00

KM Dalam 1.00 bh 225,000.00 225,000.00

Lt. 2 1.00 bh 101,600.00 101,600.00

11 Memasang shower box Lt. 2 1.00 bh 3,800,000.00 3,800,000.00

12 Memasang tandon air stainless steel 1200 L Lt. 2 1.00 bh 3,750,000.00 3,750,000.00

13 Memasang pintu PVC Lt. 1 1.00 bh 155,000.00 155,000.00

Lt. 2 2.00 bh 165,000.00 330,000.00

Sub total 26,800,832.50 26,800,800.00

I Pekerjaan Penutup Lantai

1 Pasang lantai keramik 20 x 20 cm motif Lt. 1 3.43 m² 115,650.00 396,679.50

Lt. 2 5.67 m² 120,650.00 684,085.50

2 Pasang lantai keramik 30 x 30 cm motif Lt. 1 12.02 m² 104,000.00 1,250,080.00

Lt. 2 2.21 m² 109,100.00 241,111.00

3 Pasang lantai keramik 40 x 40 cm motif Lt. 1 19.10 m² 134,300.00 2,565,130.00

Lt. 2 34.70 m² 139,200.00 4,830,240.00

4 Pasang lantai ubin granit cream 60 x 60 cm ex Cina Lt. 1 39.60 m² 228,550.00 9,050,580.00

Lt. 2 11.90 m² 233,450.00 2,778,055.00

5 Pasang dinding keramik 20 x 25 cm polos Lt. 1 8.22 m² 116,400.00 956,808.00

Lt. 2 10.28 m² 123,900.00 1,273,692.00

6 Pasang dinding keramik 20 x 25 cm motif Lt. 1 6.79 m² 147,850.00 1,004,640.75

Lt. 2 11.86 m² 155,350.00 1,842,451.00

7 Pasang list keramik dinding t = 10 m Lt. 1 8.50 m² 51,050.00 433,925.00

Lt. 2 6.00 m² 54,150.00 324,900.00

8 Pasang list kuku macan p = 10 cm Lt. 1 13.70 m 38,400.00 526,080.00

Lt. 2 2.21 m 41,550.00 91,825.50

9 Pasang dinding Granit warna hitam (wastafel) Lt. 2 0.56 m² 481,250.00 269,500.00

10 Pasang dinding batu sirih / alur ( hitam dan kuning ) Lt. 1 1.35 m² 289,600.00 390,960.00

Lt. 2 0.48 m² 302,350.00 145,128.00

Sub total 29,055,871.25 29,055,850.00

J Analisa biaya kontruksi Pekerjaan pengecatan

1 Pengecatan tembok baru ex catylac Lt. 1 238.05 m² 29,500.00 7,022,475.00

Lt. 2 286.39 m² 30,750.00 8,806,492.50

2 Pengecatan permukaan baja dengan cat besi Lt. 1 15.03 m² 24,900.00 374,197.20

Lt. 2 8.37 m² 26,900.00 225,206.80

3 Pelaburan bidang kayu baru dengan politur Lt. 1 31.17 m² 54,450.00 1,697,206.50

Lt. 2 m² 55,550.00 0.00

4 Pengecatan water proof Lt. 2 22.75 m² 23,450.00 533,487.50

5 Pengecatan dinding exterior Lt. 1 63.38 m² 64,350.00 4,078,503.00

Lt. 2 31.78 m² 65,600.00 2,084,768.00

6 Coating Dof Lt. 1 1.35 m² 23,650.00 31,927.50

Lt. 2 0.48 m² 24,850.00 11,928.00

Sub total 24,866,192.00 24,866,150.00

K Pekerjaan langit – langit / plafon

1 Pasang plafond gypsum rangka hollow+list 108.63 m² 120,000.00 13,035,600.00

Sub total 13,035,600.00 13,035,600.00

L Pekerjaan Kunci dan Kaca

1 Pasang engsel pintu Lt. 1 20.00 bh 77,500.00 1,550,000.00

Lt. 2 6.00 bh 80,000.00 480,000.00

2 Pasang engsel pivot 4.00 bh 87,500.00 350,000.00

3 Pasang rail pintu geser 1.00 bh 528,000.00 528,000.00

4 Pasang engsel jendela Lt. 1 2.00 bh 31,100.00 62,200.00

Lt. 2 12.00 bh 32,800.00 393,600.00

5 Pasang grendel pintu 12.00 bh 58,050.00 696,600.00

6 Pasang handel pintu utama 6.00 bh 163,050.00 978,300.00

7 Pasang handel pintu biasa Lt. 1 1.00 bh 93,050.00 93,050.00

Lt. 2 3.00 bh 95,650.00 286,950.00

8 Pasang handel tanam pintu geser 1.00 bh 48,000.00 48,000.00

9 Pasang kait angin Lt. 1 1.00 bh 53,050.00 53,050.00

Lt. 2 6.00 bh 55,650.00 333,900.00

10 Pasang kaca rayband, tebal 5 mm Lt. 1 4.33 m² 137,800.00 596,674.00

Lt. 2 3.96 m² 140,300.00 556,008.90

11 Kusen Alluminium 4" Putih ex alexindo 9.84 m 75,000.00 738,000.00

12 Pagar Hollow 4x4 cm, Jari-jari 2x4 cm 16.08 m² 325,000.00 5,226,000.00

Page 87: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalSub total 12,970,332.90 12,970,300.00

Page 88: RAB rumah

No Jenis Pekerjaan Volume Satuan Harga Satuan Jumlah TotalM Pekerjaan Elektrikal

1 Pemasangan MCB+kotak 2.00 bh 85,000.00 170,000.00

2 Instalasi pipa kabel pvc 1/8" 168.50 m 2,000.00 337,000.00

3 Kabel NYA - 1 x 2.5 "Eterna" 1 roll = 100m 6.00 roll 230,000.00 1,380,000.00

4 Lampu SL 8 watt 4.00 bh 27,500.00 110,000.00

5 Lampu SL 14 watt 5.00 bh 36,600.00 183,000.00

6 Lampu SL 18 watt 2.00 bh 40,700.00 81,400.00

7 Lampu SL 5 watt 12.00 bh 25,000.00 300,000.00

8 Lampu hias 30 watt 1.00 bh 150,000.00 150,000.00

9 Lampu Dop (bolamp) 5 watt 10.00 bh 1,500.00 15,000.00

10 Lampu taman 25 watt 2.00 bh 65,000.00 130,000.00

11 Downlight ex China 5" 15.00 bh 38,750.00 581,250.00 12 Fitting lampu 16.00 bh 25,000.00 400,000.00 13 Saklar tunggal ex Brocco 5.00 bh 13,750.00 68,750.00 14 Saklar ganda ex Brocco 10.00 bh 19,350.00 193,500.00 15 Stop kontak 13.00 bh 17,000.00 221,000.00 16 Stop kontak AC 3.00 bh 64,500.00 193,500.00 17 Tenaga ME listrik pasang MCB 2.00 titik 50,000.00 100,000.00 18 Tenaga ME listrik pasang fitting lampu 33.00 titik 15,000.00 495,000.00 19 Tenaga ME listrik pasang stop kontak 16.00 titik 25,000.00 400,000.00 20 Tenaga ME listrik pasang saklar 15.00 titik 25,000.00 375,000.00

Sub total 5,884,400.00 5,884,400.00 TOTAL 349,466,550.00

Dibulatkan 349,466,000.00

Terbilang : Tiga Ratus Tujuh Puluh Sembilan Juta Empat Ratus Lima Puluh Tiga Ribu Rupiah