Page 1: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU
Page 2: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

PT. ESTU ARTHA LANCARPT. ESTU ARTHA LANCARHEAD OFFICEHEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang,Jl. Bangka I no. 4A Lt.2, Pela Mampang,

J k t S l t I d i 12720J k t S l t I d i 12720

PT. ESTU ARTHA LANCARPT. ESTU ARTHA LANCAR

OPERATIONAL OFFICEOPERATIONAL OFFICE

Jakarta Selatan, Indonesia, 12720Jakarta Selatan, Indonesia, 12720

Jl. Ampera Raya No. 18 NKFJl. Ampera Raya No. 18 NKF--Building BBuilding BCilandak Jakarta Selatan IndonesiaCilandak Jakarta Selatan Indonesia

PHONEPHONE

Cilandak, Jakarta Selatan, IndonesiaCilandak, Jakarta Selatan, Indonesia

(62.21) 32151718(62.21) 32151718

FACSIMILEFACSIMILE (62.21) 788 38 541(62.21) 788 38 541

EMAILEMAIL [email protected]@[email protected]@gmail.com

Page 3: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENT

COMMISSIONERCOMMISSIONERUTORO WREKSOATMODJO, SEUTORO WREKSOATMODJO, SE

PRESIDENT DIRECTORPRESIDENT DIRECTORIR. EMIL JUDO RAHARDJOIR. EMIL JUDO RAHARDJO

DIRECTORDIRECTORNOVITA WREKSOATMODJO SENOVITA WREKSOATMODJO SENOVITA WREKSOATMODJO, SENOVITA WREKSOATMODJO, SE

Page 4: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

HUMAN RESOURCESHUMAN RESOURCESHUMAN RESOURCESHUMAN RESOURCES44PIPELINE, PIPING PIPELINE, PIPING AND MECHANICALAND MECHANICAL PERSONsPERSONs

22PROCESSPROCESS

22CIVILCIVIL

PERSONsPERSONs

PERSONsPERSONs

44ELECTRICAL & INSTRUMENTATION ELECTRICAL & INSTRUMENTATION

22CONTRACT ADMIN & PROGRESS CONTROLCONTRACT ADMIN & PROGRESS CONTROL

PERSONsPERSONs

PERSONsPERSONs22CONTRACT ADMIN & PROGRESS CONTROLCONTRACT ADMIN & PROGRESS CONTROL

22PROJECT ENGINEERPROJECT ENGINEER

PERSONsPERSONs

PERSONsPERSONs

11DESIGNERDESIGNER PERSONsPERSONs

77DRAFTERDRAFTER PERSONsPERSONs

Page 5: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

RESOURCESRESOURCESRESOURCESRESOURCES

PROCESSPROCESS

PIPING & MECHANICAL PIPING & MECHANICAL

HysisHysis

Caesar, PveliteCaesar, Pvelite

PIPELINE PIPELINE

CIVILCIVIL

Autocad PDMSAutocad PDMS

SAPSAPCIVIL CIVIL

ELECTRICAL & INSTRUMENTATION ELECTRICAL & INSTRUMENTATION

SAPSAP

Etap, InstruCalEtap, InstruCal

Page 6: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

(2006 (2006 –– 2007)2007) OFFSTAKE STATION INSTALLATIONOFFSTAKE STATION INSTALLATION

(2006 (2006 –– 2007)2007) PERUSAHAAN GAS NEGARA’s SOUTH SUMATRA PERUSAHAAN GAS NEGARA’s SOUTH SUMATRA ––WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJURAWA MAJURAWA MAJURAWA MAJU

(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1 GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1 GRESIK(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK

Page 7: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK

(200(200 2008)2008) EHTYLENE GAS RECEIVING SYSTEM PROJECT PTEHTYLENE GAS RECEIVING SYSTEM PROJECT PT(2007 (2007 –– 2008)2008) EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGONSTYRINDO MONO INDONESIA, CILEGON

(2007 (2007 –– 2009)2009) TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYAONSHORE PIPELINE, TUBAN TO SURABAYA

Page 8: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

(2008 (2008 –– 2009)2009) KAMBUNA ONSHORE PIPELINE AND MODULEKAMBUNA ONSHORE PIPELINE AND MODULE--1 1 ONSHORE RECEIVING FACILITIESONSHORE RECEIVING FACILITIES

(2008 (2008 –– 2009)2009) GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECTPROJECT

(2009)(2009) FEED DOCUMENT(s) OF PT. SUMBER PETRINDO FEED DOCUMENT(s) OF PT. SUMBER PETRINDO PERKASA’s GAS SUPPLY TO PLTGU TAMBAK LOROKPERKASA’s GAS SUPPLY TO PLTGU TAMBAK LOROKPERKASA s GAS SUPPLY TO PLTGU TAMBAK LOROK PERKASA s GAS SUPPLY TO PLTGU TAMBAK LOROK PROJECTPROJECT

Page 9: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

(2009)(2009) PEKERJAAN JASA PEMBORONGAN PEMBUATAN PEKERJAAN JASA PEMBORONGAN PEMBUATAN DOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGAN DOKUMEN (RKS) DAN PERKIRAAN PENGHITUNGAN BIAYA (RAB) UNTUK PIPANISASI GASBIAYA (RAB) UNTUK PIPANISASI GAS

(2010)(2010) AS BUILT DRAWING AS BUILT DRAWING --as part ofas part of-- SOUTH SUMATRA SOUTH SUMATRA ––WEST JAVA GAS PIPELINE PROJECT PHASE IIWEST JAVA GAS PIPELINE PROJECT PHASE II --WEST JAVA GAS PIPELINE PROJECT PHASE II WEST JAVA GAS PIPELINE PROJECT PHASE II ONSHOREONSHORE

(2010) (2010) PENGADAAN JASA KONSULTAN DESAIN INSTALASI PENGADAAN JASA KONSULTAN DESAIN INSTALASI KALIBRATOR WARUKALIBRATOR WARU

Page 10: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

(2010(2010)) SOUTH SUMATERA NGL PROJECTSOUTH SUMATERA NGL PROJECT

(2010 (2010 –– 2011)2011) STUDI PENGGANTIAN CROSS COUNTRY PIPELINESSTUDI PENGGANTIAN CROSS COUNTRY PIPELINES(1 JALUR PIPA IFO/IDF 24”) DAN STUDY PEMINDAHAN (1 JALUR PIPA IFO/IDF 24”) DAN STUDY PEMINDAHAN JALUR PIPA DAN JALUR KABEL UNTUK AREA JALUR PIPA DAN JALUR KABEL UNTUK AREA PENYEBERANGAN KALIYASAPENYEBERANGAN KALIYASA

((20102010 2011)2011) UPGRADING / MODIFIKASI FASILITAS INJEKSI AIRUPGRADING / MODIFIKASI FASILITAS INJEKSI AIR((2010 2010 –– 2011)2011) UPGRADING / MODIFIKASI FASILITAS INJEKSI AIR UPGRADING / MODIFIKASI FASILITAS INJEKSI AIR PILOT WATERFLOOD LAPANGAN RANTAU PILOT WATERFLOOD LAPANGAN RANTAU –– REGION REGION SUMATRASUMATRA

Page 11: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE PMC & ENG.PMC & ENG.EXPERIENCEEXPERIENCE

((20112011 t)t) GASGAS SUPPLY TO TAMBAK LOROK POWER PLANTSUPPLY TO TAMBAK LOROK POWER PLANT

((2011)2011) UPGRADING MUARA BEKASI RECEIVING STATION UPGRADING MUARA BEKASI RECEIVING STATION

((20112011 –– recent)recent) GAS GAS SUPPLY TO TAMBAK LOROK POWER PLANT SUPPLY TO TAMBAK LOROK POWER PLANT AND PIPELINE AND PIPELINE TRANSMISSION CONSTRUCTION TRANSMISSION CONSTRUCTION RANDU BLATUNG RANDU BLATUNG –– TAMBAK LOROKTAMBAK LOROK

((2012 2012 –– recent)recent) SSWJ SSWJ CIKANDE BITUNG DISTRIBUTION PIPELINE CP CIKANDE BITUNG DISTRIBUTION PIPELINE CP 3B3B

((2012 2012 –– recent)recent) TERBANGGI BESAR GAS BOOSTER STATIONTERBANGGI BESAR GAS BOOSTER STATION

Page 12: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE VARIOUSVARIOUSEXPERIENCEEXPERIENCE

CONSTRUCTIONCONSTRUCTION

(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK

CONSTRUCTIONCONSTRUCTION

(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1 GRESIKLPG TANK & LOADING SYSTEM PHASE 1 GRESIK(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK

(2007)(2007) PROJECT MANAGEMENT PROJECT MANAGEMENT -- TTU TUBANTTU TUBAN

HUMAN RESOURCESHUMAN RESOURCES

(2007)(2007) PROJECT MANAGEMENT PROJECT MANAGEMENT –– JAMBI MERANG PIPELINEJAMBI MERANG PIPELINE

Page 13: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EXPERIENCEEXPERIENCE VARIOUSVARIOUSEXPERIENCEEXPERIENCE

SUPPLYSUPPLY

(2007)(2007) LPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIKLPG PLANT FLOW LINE SYSTEM PHASE 1, GRESIK

SUPPLYSUPPLY

(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1 GRESIKLPG TANK & LOADING SYSTEM PHASE 1 GRESIK(2007)(2007) LPG TANK & LOADING SYSTEM PHASE 1, GRESIKLPG TANK & LOADING SYSTEM PHASE 1, GRESIK

(2008)(2008) PT. STYRINDO MONO INDONESIAPT. STYRINDO MONO INDONESIA

Page 14: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

OFFSTAKE STATION INSTALLATIONOFFSTAKE STATION INSTALLATIONPROJECT DETAILPROJECT DETAIL

•• Project ManagementProject Management•• Detailed DesignDetailed Design

SERVICESSERVICESTheThe custodycustody transfertransfer stationstation forfor gasgassuppliessupplies fromfrom TGITGI (Transgasindo)(Transgasindo) intointo

PROFILEPROFILE

gg•• ConstructionConstruction•• CommissioningCommissioning•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation

pppp ( g )( g )PGNPGN NaturalNatural GasGas RiauRiau DistributionDistributionNetworkNetwork.. TheThe CapacityCapacity isis UpUp toto 150150MMSCFDMMSCFD

FiscalFiscal MeteringMetering StationStation includedincluded ::FirstFirst Filtration,Filtration, InletInlet Filters,Filters, MetersMeters(Ultrasonic),(Ultrasonic), Chromatographs,Chromatographs,Analyzers,Analyzers, ControlControl Valves,Valves, Regulators,Regulators,y ,y , ,, g ,g ,Odorize,Odorize, CorrosionCorrosion Inhibitor,Inhibitor, ProcessProcessPipePipe work,work, VentingVenting PipePipe work,work,InstrumentationInstrumentation andand Controls,Controls, Scada,Scada,Switchboards,Switchboards, DieselDiesel Generators,Generators, andand

PT. YUAN SEJATIPT. YUAN SEJATI

CLIENTCLIENT

,, ,,TransformersTransformers..

BuildingsBuildings includedincluded ::Administration,Administration, ControlControl Room,Room, FireFire,, ,,Station,Station, Utilities,Utilities, MeteringMetering Shelter,Shelter,AnalyzerAnalyzer ShelterShelter andand GuardGuard HouseHouse..

Page 15: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

SOUTH SUMATRA SOUTH SUMATRA –– WEST JAVA PIPELINE ONSHOREWEST JAVA PIPELINE ONSHOREPROJECT DETAILPROJECT DETAIL

•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance

SERVICESSERVICESPGN’sPGN’s SouthSouth SumatraSumatra –– WestWest JavaJava 44PipelinePipeline OnshoreOnshore Project,Project, 3232 KMKM 2424””

PROFILEPROFILE

•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation

pp j ,j ,GasGas OnshoreOnshore Pipeline,Pipeline, MuaraMuara BekasiBekasi totoRawaRawa MajuMaju withwith capasitycapasity upup toto 400400MMSCFDMMSCFD

PipelinePipeline includedincluded ::PipelinePipeline DetailedDetailed EngineeringEngineering consistsconsistsofof:: 44 BlockBlock ValveValve Station,Station, RiverRiver andandRoadRoad Crossings,Crossings, AnchorAnchor Blocks,Blocks,g ,g , ,,CathodicCathodic ProtectionProtection SystemSystem

PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. Perusahaan Gas Negara (Tbk.)PT. Perusahaan Gas Negara (Tbk.)

CLIENTCLIENT

g ( )g ( )

Page 16: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

LPG PLANT FLOW LINE SYSTEM PHASE 1LPG PLANT FLOW LINE SYSTEM PHASE 1PROJECT DETAILPROJECT DETAIL

•• Project ManagementProject Management•• Detailed DesignDetailed Design

SERVICESSERVICESTheThe NetworkNetwork withwith capacitycapacity UpUp toto 4040MMSCFDMMSCFD

PROFILEPROFILE

gg•• Hand over DocumentationHand over Documentation

Including in this project :Including in this project :•• Procurement / Material SuppliesProcurement / Material Supplies

FiscalFiscal MeteringMetering StationStation includedincluded ::FirstFirst Filtration,Filtration, InletInlet Filters,Filters, MetersMeters(Orifice),(Orifice), Chromatographs,Chromatographs, Analyzers,Analyzers, pppp

•• Construction, Commissioning & AsConstruction, Commissioning & As--builtbuilt

( ),( ), g p ,g p , y ,y ,ControlControl Valves,Valves, Regulators,Regulators, ProcessProcessPipePipe work,work, VentingVenting PipePipe work,work,InstrumentationInstrumentation andand ControlsControls

PT. MEDIA KARYA SENTOSA (Media PT. MEDIA KARYA SENTOSA (Media Energy)Energy)

CLIENTCLIENT

gy)gy)

Page 17: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

LPG TANK & LOADING SYSTEM PHASE 1LPG TANK & LOADING SYSTEM PHASE 1PROJECT DETAILPROJECT DETAIL

SERVICESSERVICESTheThe NetworkNetwork withwith capacitycapacity UpUp toto 4040MMSCFDMMSCFD

PROFILEPROFILE•• Project ManagementProject Management•• Detailed DesignDetailed Design

FiscalFiscal MeteringMetering StationStation includedincluded ::TankTank System,System, FlareFlare HeaderHeader SystemSystemincludingincluding FlareFlare SubSub--system,system, LoiadingLoiading

gg•• Hand over DocumentationHand over Documentation

Including in this project :Including in this project :•• Procurement / Material SuppliesProcurement / Material Suppliesgg y ,y , gg

Facilities,Facilities, FlareFlare Stack,Stack, TankTank gauginggaugingSystem,System, PumpPump Syatem,Syatem, InstrumentationInstrumentationandand ControlControl SystemSystem

pppp•• Construction, Commissioning & AsConstruction, Commissioning & As--

builtbuilt

PT. MEDIA KARYA SENTOSA (Media PT. MEDIA KARYA SENTOSA (Media Energy)Energy)

CLIENTCLIENT

gy)gy)

Page 18: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

EHTYLENE GAS RECEIVING SYSTEMEHTYLENE GAS RECEIVING SYSTEMPROJECT DETAILPROJECT DETAIL

•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance

SERVICESSERVICESEhtyleneEhtylene GasGas ReceivingReceiving SystemSystem ProjectProjectofof PTPT.. StyrindoStyrindo MonoMono IndonesiaIndonesia hashas

PROFILEPROFILE

•• Construction EngineeringConstruction Engineering•• CommissioningCommissioning•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation

yycapacitycapacity UpUp toto 4545 PsiPsi ofof EthyleneEthylene GasGas

CompressorCompressor includedincluded ::ComppressorComppressor Units,Units, FirstFirst Filtration,Filtration, InletInlet

•• Fitting Supplies (Variation Order)Fitting Supplies (Variation Order)pppp ,, ,,

Filters,Filters, CoriolisCoriolis Meters,Meters,Chromatographs,Chromatographs, Analyzers,Analyzers, ControlControlValves,Valves, Regulators,Regulators, ProcessProcess PipePipe work,work,VentingVenting PipePipe work,work, InstrumentationInstrumentation andandgg pp ,,ControlsControls..

PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. Styrindo Mono Indonesia, CilegonPT. Styrindo Mono Indonesia, Cilegon

CLIENTCLIENT

y gy g

Page 19: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

TTU TUBAN PERTAMINA PROJECTTTU TUBAN PERTAMINA PROJECTPROJECT DETAILPROJECT DETAIL

•• Detailed DesignDetailed Design•• Project ManagementProject Management

SERVICESSERVICESTTUTTU TubanTuban PERTAMINAPERTAMINA ProjectProject ofof 136136KMKM 1616”” FuelFuel OnshoreOnshore PipelinePipeline TubanTuban toto

PROFILEPROFILE

j gj g•• Procurement AssistanceProcurement Assistance•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation

ppSurabayaSurabaya withwith capacitycapacity ofof 1515,,000000 barrelbarrelperper--dayday

PipelinePipeline includedincluded ::ppPipelinePipeline DetailedDetailed DesignDesign consistsconsists ofof:: 22HDD,HDD, 1313 BlockBlock Valve,Valve, RoadRoad andand RiverRiverCrossings,Crossings, SwampSwamp Area,Area, AnchorAnchor Blocks,Blocks,CathodicCathodic protectionprotection SystemSystempp yy

PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. PERTAMINA (Persero)PT. PERTAMINA (Persero)

CLIENTCLIENT

( )( )

Page 20: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

KAMBUNA PIPELINE & RECEIVING FACILITIESKAMBUNA PIPELINE & RECEIVING FACILITIESPROJECT DETAILPROJECT DETAIL

•• Electrical and Instrumentation Electrical and Instrumentation Detailed DesignDetailed Design

SERVICESSERVICES5757 KMKM OffshoreOffshore toto OnshoreOnshore PipelinePipeline andandModuleModule--11 OnshoreOnshore ReceivingReceiving FacilitiesFacilities

PROFILEPROFILE

gg•• Hand over DocumentationHand over Documentation

ggGelagahGelagah KambunaKambuna

ElectricalElectrical andand InsturmentationInsturmentation includedincluded ::PressurePressure Transmitter,Transmitter, PressurePressure,,Indicator,Indicator, TemperatureTemperature Transmitter,Transmitter,TemperatureTemperature Indicator,Indicator, PressurePressure ControlControlValve,Valve, SilenoidSilenoid Valve,Valve, PressurePressure SafetySafetyValve,Valve, CorrosionCorrosion Coupon,Coupon, CorrosionCorrosion,, p ,p ,Probe,Probe, PigPig Signal,Signal, ElectricalElectrical Grounding,Grounding,ElectricalElectrical Lighting,Lighting, TubingTubing LayoutLayout..

PT. CITRA PANJI MANUNGGAL for Asia PT. CITRA PANJI MANUNGGAL for Asia Petroleum DevelopmentPetroleum Development

CLIENTCLIENT

pp

Page 21: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

GUNUNG MEGANG SINGA GAS BOOSTER PIPELINEGUNUNG MEGANG SINGA GAS BOOSTER PIPELINEPROJECT DETAILPROJECT DETAIL

•• Detailed DesignDetailed Design•• Procurement AssistanceProcurement Assistance

SERVICESSERVICES1717,,55 KMKM OnshoreOnshore GunungGunung MegangMegangSingaSinga GasGas BoosterBooster PipelinePipeline ProjectProject..

PROFILEPROFILE

•• Construction EngineeringConstruction Engineering•• AsAs--builtbuilt•• Hand over DocumentationHand over Documentation

gg pp jj

CompressorCompressor andand PipelinePipeline includedincluded ::ComppressorComppressor Units,Units, ControlControl Valves,Valves,Process,Process, PipelinePipeline DetailedDetailed Design,Design,,, pp g ,g ,InstrumentationInstrumentation andand Controls,Controls, ElectricalElectricalandand CivilCivil WorksWorks..

PT. CITRA PANJI MANUNGGAL for PT. CITRA PANJI MANUNGGAL for Medco EnergyMedco Energy

CLIENTCLIENT

gygy

Page 22: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

FEED OF GAS SUPPLY TO PLTGU TAMBAK LOROKFEED OF GAS SUPPLY TO PLTGU TAMBAK LOROKPROJECT DETAILPROJECT DETAIL

•• FEED DocumentsFEED Documents

SERVICESSERVICESFEEDFEED DocumentsDocuments ofof PTPT.. SUMBERSUMBERPETRINDOPETRINDO PERKASAPERKASA (SPP)’s(SPP)’s GasGas

PROFILEPROFILE

( )( )SupplySupply toto PLTGUPLTGU TambakTambak LorokLorok ProjectProject

135135 KMKM –– 2020inchinch PipelinePipeline withwith 22 UnitUnitBoosterBooster CompressorCompressor Package,Package,pp g ,g ,ReceivingReceiving StationStation andand GasGas TransferTransferStationStation

PT. CITRA PANJI MANUNGGAL forPT. CITRA PANJI MANUNGGAL forPT. Sumber Petrindo PerkasaPT. Sumber Petrindo Perkasa

CLIENTCLIENT

Page 23: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

DOKUMEN RKS DAN RAB UNTUK PIPANISASI GASDOKUMEN RKS DAN RAB UNTUK PIPANISASI GASPROJECT DETAILPROJECT DETAIL

•• Detailed DesignDetailed Design•• Cost EstimationCost Estimation

SERVICESSERVICESEngineeringEngineering andand CostCost EstimationEstimation forforGasGas PipelinePipeline ofof PTPT.. PerusahaanPerusahaan ListrikListrik

PROFILEPROFILE

ppNegaraNegara (PLN),(PLN), CilegonCilegon -- BantenBanten

PipelinePipeline includedincluded ::ControlControl Valves,Valves, Process,Process, PipelinePipeline,, ,, ppDetailedDetailed Design,Design, InstrumentationInstrumentation andandControls,Controls, ElectricalElectrical andand CivilCivil WorksWorks..

PT. PERUSAHAAN LISTRIK NEGARAPT. PERUSAHAAN LISTRIK NEGARA

CLIENTCLIENT

Page 24: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

SOUTH SUMATRA WEST JAVA GAS PIPELINE PhaseSOUTH SUMATRA WEST JAVA GAS PIPELINE Phase--IIIIPROJECT DETAILPROJECT DETAIL

•• AsAs--Built Drawing (Alignment Sheet)Built Drawing (Alignment Sheet)

SERVICESSERVICESPGN’sPGN’s SouthSouth SumatraSumatra –– WestWest JavaJavaPhasePhase--IIII PipelinePipeline Project,Project, 195195 KMKM 3636””

PROFILEPROFILE

pp j ,j ,GasGas PipelinePipeline

Joint Operation of PT. CITRA PANJI Joint Operation of PT. CITRA PANJI MANUNGGAL, PT. Remaja Bangun MANUNGGAL, PT. Remaja Bangun

CLIENTCLIENT

j gj gKencana Kontraktor, PT. Winatek Widita Kencana Kontraktor, PT. Winatek Widita (CRW Joint Operation) for(CRW Joint Operation) forPT. Perusahaan Gas Negara (Tbk)PT. Perusahaan Gas Negara (Tbk)

Page 25: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

KONSULTAN DESAIN INSTALASI KALIBRATOR WARUKONSULTAN DESAIN INSTALASI KALIBRATOR WARUPROJECT DETAILPROJECT DETAIL

•• Detailed Engineering DesignDetailed Engineering Design•• Cost EstimationCost Estimation

SERVICESSERVICESWaruWaru CalibratorCalibrator MachineMachine DesignDesign andandProjectProject ManagementManagement Consultancy,Consultancy,

PROFILEPROFILE

•• Project Management ConsultantProject Management Consultant•• Procurement Assistance and Procurement Assistance and

SupervisorySupervisory•• Construction SupervisoryConstruction Supervisory

jj gg y,y,SurabayaSurabaya

DesainDesain InstalasiInstalasi KalibratorKalibrator WaruWaruincludedincluded :: p yp y

•• Hand over DocumentationHand over DocumentationDetailDetail DesignDesign ofof CalibratorCalibrator Unit,Unit,ElectricalElectrical andand CivilCivil WorksWorks;; andand ProjectProjectManagementManagement ConsultantConsultant forfor CalibratorCalibratorInstallationInstallation..

PT. Perusahaan Gas Negara (Persero) PT. Perusahaan Gas Negara (Persero) Tbk, SurabayaTbk, Surabaya

CLIENTCLIENT

yy

Page 26: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

SOUTH SUMATERA NGL PROJECTSOUTH SUMATERA NGL PROJECTPROJECT DETAILPROJECT DETAIL

•• Topography Survey and Soil Topography Survey and Soil InvestigationInvestigation

SERVICESSERVICESOneOne ((11)) 88 inchinch NominalNominal DiameterDiameter singlesingleNGLNGL PipelinePipeline -- SouthSouth SumatraSumatra NGLNGL

PROFILEPROFILE

gg•• Detailed Engineering DesignDetailed Engineering Design•• Project Management ConsultantProject Management Consultant•• Procurement Assistance and Procurement Assistance and

SupervisorySupervisory

ppProject,Project, 8989..6060 KilometersKilometers fromfromPrabumulihPrabumulih BaratBarat StationStation toto PulauPulauLayangLayang -- Palembang,Palembang, SouthSouth SumatraSumatra..

p yp y•• Hand over DocumentationHand over Documentation

PT. KELSRI and PT. TRIPATRA PT. KELSRI and PT. TRIPATRA forforPT E1PT E1--PertagasPertagas

CLIENTCLIENT

PT. E1PT. E1 PertagasPertagas

Page 27: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

STUDI PENGGANTIAN CROSS COUNTRY PIPELINESSTUDI PENGGANTIAN CROSS COUNTRY PIPELINESPROJECT DETAILPROJECT DETAIL

•• Topography Survey and Soil Topography Survey and Soil InvestigationInvestigation

SERVICESSERVICES2424 inchinch DiameterDiameter PipelinePipeline ReplacementReplacement–– PertaminaPertamina RefineryRefinery UnitUnit IVIV Project,Project,

PROFILEPROFILE

gg•• Detailed Engineering DesignDetailed Engineering Design•• Cost EstimationCost Estimation•• Hand over DocumentationHand over Documentation

yy j ,j ,77,,0000 KilometersKilometers fromfrom PertaminaPertamina RURU IVIVtoto AreaArea 7070,, CilacapCilacap..

PT. Pertamina Refinery Unit IV CilacapPT. Pertamina Refinery Unit IV Cilacap

CLIENTCLIENT

Page 28: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

UPGRADING FASILITAS AIR PILOT WATERFLOODUPGRADING FASILITAS AIR PILOT WATERFLOODPROJECT DETAILPROJECT DETAIL

•• Detailed Engineering DesignDetailed Engineering Design•• Procurement Assistance and Procurement Assistance and

SERVICESSERVICESUpgradingUpgrading // ModifikasiModifikasi FasilitasFasilitas InjeksiInjeksiAirAir PilotPilot WaterfloodWaterflood LapanganLapangan RantauRantau ––

PROFILEPROFILE

SupervisorySupervisory•• Hand over DocumentationHand over Documentation

p gp gRegionRegion SumatraSumatra consistconsist ofof RevitalizationRevitalizationofof WaterWater TreatmentTreatment PlanPlan atat AlurAlurBamban,Bamban, InstallationInstallation ofof NewNew WaterWaterInjectionInjection PlanPlan atat PPPPPP -- Rantau,Rantau,jj ,,RehabilitationRehabilitation ofof 33,,55 KMKM –– 1212””Pipeline,Pipeline, InstallationInstallation ofof 33,,55 KMKM –– 88”,”,33 KMKM –– 66”,”, 1313KMKM –– 22”” PipelinesPipelines

PT. Citra Panji Manunggal PT. Citra Panji Manunggal forforPT Pertamina EPPT Pertamina EP

CLIENTCLIENT

PT. Pertamina EPPT. Pertamina EP

Page 29: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

GAS SUPPLY TO TAMBAK LOROK POWER PLANTGAS SUPPLY TO TAMBAK LOROK POWER PLANTPROJECT DETAILPROJECT DETAIL

•• MappingMapping•• GeotechGeotech and and HidrologyHidrology SurveySurvey

SERVICESSERVICESGasGas PipelinePipeline TransmissionTransmission ConstructionConstructionRanduRandu BlatungBlatung –– TambakTambak LorokLorok consistconsist

PROFILEPROFILE

gygy yy•• Detailed Engineering DesignDetailed Engineering Design•• Procurement Assistance and Procurement Assistance and

SupervisorySupervisory•• Construction EngineeringConstruction Engineering

ggofof 5050 MMSCFD,MMSCFD, 130130 KM,KM, 2020 InchInchPipeline,Pipeline, GasGas Booster/Booster/ CompressorCompressorStationStation andand GasGas ReceivingReceiving StationStation fromfromCPPCPP PertaminaPertamina atat RanduRandu BlatungBlatung,, g gg g

•• Hand Hand over Documentationover Documentation•• As Build DrawingAs Build Drawing

gg,,CentralCentral JavaJava toto PTPT.. IndonesiaIndonesia Power,Power,TambakTambak LorokLorok,, Semarang,Semarang, CentralCentral JavaJava..

PT. Citra Panji Manunggal PT. Citra Panji Manunggal forforPT Sumber Petrindo PerkasaPT Sumber Petrindo Perkasa

CLIENTCLIENT

PT. Sumber Petrindo PerkasaPT. Sumber Petrindo Perkasa

Page 30: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

UPGRADING MUARA BEKASI RECEIVING STATIONUPGRADING MUARA BEKASI RECEIVING STATIONPROJECT DETAILPROJECT DETAIL

•• Topography SurveyTopography Survey•• Detailed Engineering DesignDetailed Engineering Design

SERVICESSERVICESUpgradingUpgrading MuaraMuara BekasiBekasi ReceivingReceivingStationStation fromfrom 440440 MMSCFDMMSCFD toto 880880

PROFILEPROFILE

g g gg g g•• Procurement Assistance and Procurement Assistance and

SupervisorySupervisory•• Hand over DocumentationHand over Documentation•• As Build DrawingAs Build Drawing

MMSCFDMMSCFD andand futurefuture connectionconnection..

gg

PT. ELNUSA PT. ELNUSA forforPT. Perusahaan Gas Negara (Persero)PT. Perusahaan Gas Negara (Persero)

CLIENTCLIENT

g ( )g ( )

Page 31: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

SSWJ CIKANDE BITUNG DISTR. PIPELINE CP 3BSSWJ CIKANDE BITUNG DISTR. PIPELINE CP 3BPROJECT DETAILPROJECT DETAIL

•• Detailed Detailed Engineering DesignEngineering Design•• Procurement Assistance and Procurement Assistance and

SERVICESSERVICESOneOne ((11)) 3131 km,km, 2424 inchinch NominalNominalDiameterDiameter singlesingle OnshoreOnshore PipelinePipeline fromfrom

PROFILEPROFILE

SupervisorySupervisory•• Construction EngineeringConstruction Engineering•• Hand over DocumentationHand over Documentation•• As Build DrawingAs Build Drawing

gg ppCikandeCikande StationStation toto BitungBitung Station,Station,..

gg

PT. PT. PromatkonPromatkon TepatTepat GunaGuna forforPT. Perusahaan Gas Negara (Persero)PT. Perusahaan Gas Negara (Persero)

CLIENTCLIENT

g ( )g ( )

Page 32: PT. ESTU ARTHA LANCARestuarthalancar.com/style/Company Profile Estu.pdf · PT. ESTU ARTHA LANCAR HEAD OFFICE Jl. Bangka I no. 4A Lt.2, Pela Mampang, J k t S l t I d i 12720 PT. ESTU

REGISTRATIONREGISTRATION•• Establishment DeedEstablishment Deed No. No. 102, 102, 16 April 199316 April 1993

((Ny SP Henny Shidky SH)Ny SP Henny Shidky SH)

REGISTRATIONREGISTRATION

((Ny. SP Henny Shidky SH)Ny. SP Henny Shidky SH)

•• Latest Alteration DeedLatest Alteration Deed No. 1, 1 Oktober 2009No. 1, 1 Oktober 2009(Hj. Suzie FH. Tadjoedin SH)(Hj. Suzie FH. Tadjoedin SH)

•• Legalization of Latest Legalization of Latest Alteration DeedAlteration Deed

No. AHUNo. AHU--04684.AH.01.02 04684.AH.01.02 –– th 2009, 12 Februari 2009th 2009, 12 Februari 2009(Minister of Justice)(Minister of Justice)

•• Company Register Number Company Register Number (TDP)(TDP)

No. 09.03.1.51.57058No. 09.03.1.51.57058(P k t Ad J k t S l t S k Di P i d )(P k t Ad J k t S l t S k Di P i d )(TDP)(TDP) (Pemkot Adm. Jakarta Selatan, Suku Dinas Perindag) (Pemkot Adm. Jakarta Selatan, Suku Dinas Perindag)

•• Nomor Pokok Wajib PajakNomor Pokok Wajib Pajak(NPWP)(NPWP)

01.620.462.001.620.462.0--014.000014.000

•• Inauguration date ofInauguration date ofPengusaha Kena PajakPengusaha Kena Pajak (PKP)(PKP)

9 January 20089 January 2008

•• Domicilie ReferenceDomicilie Reference No. 857/1.824No. 857/1.824(Pemda DKI, Kelurahan Pela Mampang)(Pemda DKI, Kelurahan Pela Mampang)