Proyek Jl. Suli 85

2
 NO. PEMASANGAN JUMLAH HARGA SATUAN TOTAL 1 PASANG CLOSET DUDUK 2 175,000 Rp 350,000 Rp 2 WASTAFEL 1 175,000 Rp 175,000 Rp 3 BAK SINK 1 150,000 Rp 150,000 Rp 4 FLOOR DRAIN 2 25,000 Rp 50,000 Rp 5 SHOWER 1 100,000 Rp 100,000 Rp 6 KRAN 4 20,000 Rp 80,000 Rp 905,000 Rp MENGETAHUI ( P. MISDI ) PROYEK JL. SULI NO. 85 DENPASAR II. SANITARY JUMLAH TOTAL

description

Rab pemasangan pipa proyek jalan suli denpasar...

Transcript of Proyek Jl. Suli 85

Page 1: Proyek Jl. Suli 85

7/18/2019 Proyek Jl. Suli 85

http://slidepdf.com/reader/full/proyek-jl-suli-85 1/1

NO. PEMASANGAN JUMLAH HARGA SATUAN TOTAL

1 PASANG CLOSET DUDUK 2 175,000Rp 350,000Rp

2 WASTAFEL 1 175,000Rp 175,000Rp

3 BAK SINK 1 150,000Rp 150,000Rp4 FLOOR DRAIN 2 25,000Rp 50,000Rp

5 SHOWER 1 100,000Rp 100,000Rp

6 KRAN 4 20,000Rp 80,000Rp

905,000Rp

MENGETAHUI

( P. MISDI )

PROYEK JL. SULI NO. 85 DENPASAR

II. SANITARY

JUMLAH TOTAL