PROSEDUR PURGING 1. Persiapan 1. Pastikan lokasi pekerjaan aman dan siap untuk pelaksanaan pekerjaan, dan beri pembatas pada area dengan garis pembatas (safety line). 2. Pastikan semua valve pada clossed dan skillet terpasang dengan benar 3. Informasikan kondisi kesiapan dilapangan ke PT. BBG 2. Proses N2 Purging Pertama Pastikan valve existing pada posisi clossed dan skillet terpasang dengan benar (sesuai prosedur venting PT. BBG). 1. Pasangkan N2 ke valve venting di upstream 2. Buka Valve venting, sambil mengukur kadar CH4/O2 di venting dengan gas detector. 3. Apabila kadar CH4/O2 terukur sudah mencapai 2% dan tekanan N2 mencapai 0.5 barg, tutup valve venting di upstream, dan valve venting di downstream. 3. N2 Purging Kedua 1. Pasangkan N2 ke valve venting di upstream 2. Buka Valve venting, sambil mengukur kadar O2 di venting dengan gas detector.

description

purging

Transcript of Prosedur Purging

Page 1: Prosedur Purging

PROSEDUR PURGING

1. Persiapan

1. Pastikan lokasi pekerjaan aman dan siap untuk pelaksanaan pekerjaan, dan beri pembatas pada area dengan garis pembatas (safety line).

2. Pastikan semua valve pada clossed dan skillet terpasang dengan benar3. Informasikan kondisi kesiapan dilapangan ke PT. BBG

2. Proses N2 Purging Pertama

Pastikan valve existing pada posisi clossed dan skillet terpasang dengan benar (sesuai prosedur venting PT. BBG).

1. Pasangkan N2 ke valve venting di upstream2. Buka Valve venting, sambil mengukur kadar CH4/O2 di venting dengan gas

detector.3. Apabila kadar CH4/O2 terukur sudah mencapai 2% dan tekanan N2 mencapai 0.5

barg, tutup valve venting di upstream, dan valve venting di downstream.

3. N2 Purging Kedua

1. Pasangkan N2 ke valve venting di upstream2. Buka Valve venting, sambil mengukur kadar O2 di venting dengan gas detector.3. Apabila kadar O2 terukur sudah mencapai 2% dan tekanan N2 mencapai 2 barg,

tutup valve venting di upstream, dan valve venting di downstream.

Page 2: Prosedur Purging

Lincoln Electric Fleetweld 5P, 1/8", 6010 Stick Welding Electrodes, 50 lb. Can

Fleetweld® 5P+ from Lincoln Electric is first choice for pipe welding, and vertical-up and overhead plate welding.

Ideal for steel that’s less than 100% clean. It’s a first choice for pipe

Item No. Model Desc. AWS Diameter (in.) Diameter (mm.) Package  

38-6827 ED010203 5P E6010 1/8" 3.2 50 lb. Easy Open Can

Details

Fleetweld® 5P+ from Lincoln Electric is first choice for pipe welding, and vertical-up and overhead plate welding.

Ideal for steel that’s less than 100% clean. It’s a first choice for pipe welding, and vertical-up and overhead plate welding. This electrode is a long-time favorite among operators who handle cross-country and in-plant pipe welding.

• All-position, particularly good for vertical and overhead.• Light slag with little slag interference for easy arc control.• Deep penetration with maximum admixture.• Capable of x-ray quality welds, out-of-position.• Manufactured under a quality system certified to ISO 9001 requirements.

Typical Application:

• Tolerates galvanized, plated, dirty, painted or greasy steel which cannot be completely cleaned.• Pipe welding -- cross country and in-plant.• Joints requiring deep penetration such as square edge butt welds.• Repair welding.

Conformance:

AWS A5.1: E6010ASME SFA-5.1: E6010

Page 3: Prosedur Purging

Lloyd’s: Grade 3MABS: E6010CSA W48: E4310

Model Numbers: LE ED010203 

Lincoln Electric Shield-Arc 85, 1/8", 7010-A1 Welding Stick Electrodes, 50 lb. CanNeed a reliable, all-position stick electrode? Here's your electrode! Shield-Arc 85 produces a 70,000 psi, 1/2% molybdenum weld deposit for use on 1/2% molybdenum pipe steels and API 5LX-42 through

Item No. Model AWS Diameter (in.) Diameter (mm.) Package  

38-6815 ED012885 E7010-A1 1/8" 3.2 50 lb. Easy Open Can

Details

Page 4: Prosedur Purging

Need a reliable, all-position stick electrode? Here's your electrode! Shield-Arc 85 produces a 70,000 psi, 1/2% molybdenum weld deposit for use on 1/2% molybdenum pipe steels and API 5LX-42 through X-56 line pipe.

• All position pipe welding low alloy steel stick electrode.• Light slag with little slag interference for easy arc control.• Deep penetration with maximum admixture.• Capable of x-ray quality welds, out-of-position.• Manufactured under a quality system certified to ISO 9001 requirements.

Typical Application:

• API 5LX-42 through X-56 grade pipe, and 1/2% moly steels.• Pipe welding -- cross country and in-plant.• Vertical and overhead plate welding.

Conformance:

AWS A5.5: E7010-A1ASME SFA-5.5: E7010-A1Military: MIL-E-22200/7; MIL-7010-A1CSA W48: E4910-A1