Program RAB Jadwal Bansos Sarana Media Pembelajaran 2011

download Program RAB Jadwal Bansos Sarana Media Pembelajaran 2011

of 7

Transcript of Program RAB Jadwal Bansos Sarana Media Pembelajaran 2011

RENCANA KERJA BANSOS SARANA MEDIA PEMBELAJARAN TAHUN ANGGARAN 2011NAMA SEKOLAH ALAMAT/TELP KAB/KOTA PROVINSI : SMA ISLAM SUDIRMAN AMBARAWA : Jl. JEND.SUDIRMAN NO. 2A AMBARAWA, TELP. 0298-592479 : SEMARANG : JAWA TENGAHPELAKSANAAN (BULAN) NO PROGRAM INDIKATOR PENCAPAIAN/TARGET 7 I INFRASTRUKTUR PENDUKUNG/ PERANGKAT KERAS (HARDWARE) KOMPUTER SERVER : Platform Dual CPU Tower Server, Processor Type Multi-core Intel Xeon Processor (Nehalem-based), #1 Processor Onboard Intel Xeon Processor E5606 (8M Cache, 2.13 GHz, 4.80 GT/s Intel QPI), #2 Processor Onboard Optional, Chipset Intel 5520 Server Chipset, Standard Memory 4 GB (1 x 4GB) EEC DDR3-10600 RDIMM 1333MHz, Max. Memory 192 GB (12 DIMM), Video Type Integrated ATI ES1000 32 MB, Floppy Drive Optional, #1 Controller HP Smart Array P410i, RAID 0,1,10, #2 Controller Optional, #1 Hard Drive Optional, #2 Hard Drive Optional, #3 Hard Drive Optional, #1 Optical Drive Optional, #2 Optical Drive Optional, Standard Bays Six HP proprietary hot-plug drive bays, External Terlaksananya pembelian satu Bays Optional, Interface Provided 4x USB 2.0, Serial, VGA, 2x LAN, 2x Komputer Server untuk E-Learning PS/2, Slot Provided Data not available, Networking Integrated Two Gigabit Ethernet (10/100/1000 Mbps) ports, NC326i PCI Express Dual Port Gigabit Server Adapter System Fans / Coolers Manageable Cooling Fans, Chassis Form Factor Tower Chassis, Power Supply Type HP hot-plug 460w, Redudancy enabled, Keyboard Type HP Keyboard, Input Device Type HP Mouse Monitor Optional, O/S Provided Pre-sales Request Available, Validated System Windows, RHEL, SLES, NetWare, Oracle Enterprise Linux, VMware, and Citrix, Dimensions (W x H x D) 21.8 x 47 x 59.6 cm, Weight 31.8 kg (all hard drives, power supplies, and processors installed), LCD Monitor 15,6" a. Komputer Client : Procesor Intel Core Duo E 5500 (Box), MB Gigabyte, HD Seagete 320 GB, DDR Kingston 1GB, Casing Power Pro, DVD RW Samsung, Monitor LCD LG, Keyboard dan Mouse Optik Okaya, Speaker Okaya, Stabilizer Kasugawa/ Tamayasaki b. Pengadaan Meja Komputer Local Area Network (Intranet) a. Kabel UTP Belden USA Original 3 b. Switch D-Link 16 port c. Wireless Outdoor Akses Internet : 4 Pemasangan/ Instalasi layanan Internet Dedicated 1:1 5 6 Air Conditioner (AC) APLIKASI PENUNJANG/ SOFTWARE Terlaksannya pemasangan akses internet dedicated 1 Mbps Terlaksananya pembelian 1 unit AC untuk ruang Server/ Ruang Control 10,000,000.00 5,500,000.00 10,000,000.00 5,500,000.00 Terlaksananya pembelian 5 roll kabel UTP Belden USA Original Terlaksananya pembelian Switch DLink 16 port sebanyak 5 buah Terlaksananya pemasangan 1 buah wireless outdoor 6,000,000.00 3,000,000.00 8,000,000.00 6,000,000.00 3,000,000.00 8,000,000.00 Terlaksanya pembelian 15 unit komputer client sebagai pendukung media pembelajaran Terlaksanya pembelian 15 buah meja komputer sebagai pendukung media pembelajaran 8 9 10 11 12 1 2 3 4 5 6 PUSAT (APBN) LAINNYA JUMLAH/SUMBER DANA (Rp.) JUMLAH TOTAL

1

22,000,000.00

22,000,000.00

55,500,000.00

55,500,000.00

2

15,000,000.00

PELAKSANAAN (BULAN) NO PROGRAM INDIKATOR PENCAPAIAN/TARGET 7 SISTEM OPERASI : Layanan sebagai Proxy Server, (untuk mengatur bandwidth dan pembatasan situs-situs di internet), Layanan sebagai Mail Server (layanan email), Layanan sebagai File sharing Server (berbagi file), Layanan sebagai DNS Server, Layanan sebagai Web Server, Layanan 6.1 Terlaksananya instalasi sistem operasi sebagai Database Server, Server Cerdas berfungsi sebagai server hosting, Server Cerdas berfungsi sebagai server Radio Streaming, Server Cerdas berfungsi server Video Streaming, Joomla atau CMS lainnya,Virtual Desktop untuk mendukung operasionalisasi Thin Client Platform. 6.2 Learning Management Sistem (LMS) SUB TOTAL I II 1 SUMBER DAYA MANUSIA Pelatihan E-Learning SUB TOTAL II III KONTEN Terlaksananya pelatihan pembuatan materi 40 guru untuk 18 mapel yang bisa diakses oleh peserta didik yang terdaftar Terlaksananya pelatihan pembuatan soal 40 guru untuk 18 mapel yang dapat diakses berkali - kali oleh peserta didik Terlaksananya pelatihan E-Learning 40 guru selama 3 hari Terlaksanya instalasi dan pengaturan LMS Open Source 8 9 10 11 12 1 2 3 4 5 6

JUMLAH/SUMBER DANA (Rp.) JUMLAH TOTAL PUSAT (APBN) LAINNYA

8,000,000.00

8,000,000.00

1,000,000.00 134,000,000.00 0.00

1,000,000.00 134,000,000.00

5,000,000.00 5,000,000.00 0.00

5,000,000.00 5,000,000.00

2

Pelatihan pembuatan materi

5,000,000.00

5,000,000.00

3

Pelatihan pembuatan soal

5,000,000.00

5,000,000.00

SUB TOTAL III IV 1 PENGELOLAAN Pemeliharaan Infrastuktur Terlaksananya pemeliharan infrastruktur jaringan lokal, akses internet, dan komputer server

10,000,000.00

0.00

10,000,000.00

1,000,000.00

1,000,000.00

SUB TOTAL IV

1,000,000.00

0.00

1,000,000.00

TOTAL I - IV

150,000,000.00

0.00

150,000,000.00Bogor, 14 Oktober 2011

Dibuat Oleh Kepala Sekolah,

Riyanto

ANSOS SARANA MEDIA PEMBELAJARAN AHUN ANGGARAN 2011

PERSON IN CHARGED (Penanggung jawab)

KET

Panitia

Panitia

Panitia Panitia Panitia

Panitia

PERSON IN CHARGED (Penanggung jawab)

KET

Panitia

Panitia

Panitia

Panitia

Panitia

Panitia

Bogor, 14 Oktober 2011

RENCANA ANGGARAN BIAYA ( RAB )KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN : BANTUAN SOSIAL KEMENTERIAN PENDIDIKAN NASIONAL : BANSOS SARANA MEDIA PEMBELAJARAN : SMA ISLAM SUDIRMAN AMBARAWA KABUPATEN SEMARANG : 2011

No I

Uraian Pekerjaan INFRASTRUKTUR PENDUKUNG/ PERANGKAT KERAS (HARDWARE) KOMPUTER SERVER : Platform Dual CPU Tower Server,Processor Type Multi-core Intel Xeon Processor (Nehalembased), #1 Processor Onboard Intel Xeon Processor E5606 (8M Cache, 2.13 GHz, 4.80 GT/s Intel QPI), #2 Processor Onboard Optional, Chipset Intel 5520 Server Chipset, Standard Memory 4 GB (1 x 4GB) EEC DDR310600 RDIMM 1333MHz, Max. Memory 192 GB (12 DIMM), Video Type Integrated ATI ES1000 32 MB, Floppy Drive Optional, #1 Controller HP Smart Array P410i, RAID 0,1,10, #2 Controller Optional, #1 Hard Drive Optional, #2 Hard Drive Optional, #3 Hard Drive Optional, #1 Optical Drive Optional, #2 Optical Drive Optional, Standard Bays Six HP proprietary hot-plug drive bays, External Bays Optional, Interface Provided 4x USB 2.0, Serial, VGA, 2x LAN, 2x PS/2, Slot Provided Data not available, Networking Integrated Two Gigabit Ethernet (10/100/1000 Mbps) ports, NC326i PCI Express Dual Port Gigabit Server Adapter System Fans / Coolers Manageable Cooling Fans, Chassis Form Factor Tower Chassis, Power Supply Type HP hot-plug 460w, Redudancy enabled, Keyboard Type HP Keyboard, Input Device Type HP Mouse Monitor Optional, O/S Provided Pre-sales Request Available, Validated System Windows, RHEL, SLES, NetWare, Oracle Enterprise Linux, VMware, and Citrix, Dimensions (W x H x D) 21.8 x 47 x 59.6 cm, Weight 31.8 kg (all hard drives, power supplies, and processors installed), LCD Monitor 15,6"

Volume

Harga Satuan

Jumlah Harga

1

1

buah Rp

22,000,000.00

Rp

22,000,000.00

2

3

4 5 III

a. Komputer Client : Procesor Intel Core Duo E 5500 (Box), MB Gigabyte, HD Seagete 320 GB, DDR Kingston 1GB, VGA Card 512 Mb, Casing Power Pro, DVD RW Samsung, Monitor LCD, Keyboard dan Mouse Optik Okaya, Speaker Okaya, Stabilizer Kasugawa/ Tamayasaki b. Pengadaan Meja Komputer Local Area Network (Intranet) a. Kabel UTP Belden USA Original b. Switch D-Link 16 port c. Wireless Outdoor Akses Internet : Pemasangan/ Instalasi layanan Internet Dedicated 1:1 .Air Condisioner ( AC ) ruang server APLIKASI PENUNJANG/ SOFTWARE

15

unit

Rp

3,700,000.00

Rp

55,500,000.00

15 5 5 1 1 1

buah Rp roll Rp buah Rp unit Rp paket Rp unit Rp

1,000,000.00 1,200,000.00 600,000.00 8,000,000.00 10,000,000.00 5,500,000.00

Rp Rp Rp Rp Rp Rp

15,000,000.00 6,000,000.00 3,000,000.00 8,000,000.00 10,000,000.00 5,500,000.00

No

Uraian Pekerjaan SISTEM OPERASI : Layanan sebagai Proxy Server, (untukmengatur bandwidth dan pembatasan situs-situs di internet), Layanan sebagai Mail Server (layanan email), Layanan sebagai File sharing Server (berbagi file), Layanan sebagai DNS Server, Layanan sebagai Web Server, Layanan sebagai Database Server, Server Cerdas berfungsi sebagai server hosting, Server Cerdas berfungsi sebagai server Radio Streaming, Server Cerdas berfungsi server Video Streaming, Joomla atau CMS lainnya,Virtual Desktop untuk mendukung operasionalisasi Thin Client Platform.

Volume

Harga Satuan

Jumlah Harga

1

1

paket Rp

8,000,000.00

Rp

8,000,000.00

2 II 1 III 2 3 IV 1

Learning Management Sistem (LMS) SUB TOTAL I SUMBER DAYA MANUSIA Pelatihan E-Learning SUB TOTAL II KONTEN Pengadaan materi online Pengadaan latihan soal online dan soal tes online SUB TOTAL III PENGELOLAAN Pemeliharaan Infrastuktur SUB TOTAL IV

1

paket Rp

1,000,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,000,000.00 134,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 10,000,000.00 1,000,000.00 1,000,000.00

1

keg

Rp

5,000,000.00

1 1

paket Rp paket Rp

5,000,000.00 5,000,000.00

1

keg

Rp

1,000,000.00

TOTAL I - IV

Rp

150,000,000.00

Bogor, 14 Oktober 2011 Dibuat Oleh Kepala Sekolah,

Riyanto

JADWAL RENCANA KEGIATAN BANTUAN SOSIAL SARANA MEDIA PEMBELAJARAN SMA ISLAM SUDIRMAN AMBARAWA TAHUN ANGGARAN 2011NO 1 URAIAN KEGIATAN 2 TANGGAL 3 Oktober 2011 2011 Juli 4 Agustus 5 September 6 Oktober 7 November 8 Desember 9

1 Penyusunan Proposal

2 Pengumpulan Proposal Seleksi dan Verifikasi Proposal oleh Tim Sosialisasi Kegiatan di Tingkat Sekolah

Oktober 2011

4

November 2011

5

November 2011

6 Penyaluran Dana Blog Grant November 2011

7 Pelaksanaan Kegiatan

Nov - Des 2011

8 Monitoring dan Evaluasi

Desember 2011

9 Pelaporan

Desember 2011

Bogor, 14 Oktober 2011 Dibuat Oleh Kepala Sekolah,