Perhitungan Tiang Pancang Group Pile

15
Diketahui data tanah dan hasil uji triaxial seperti gambar di bawah ini. N = 600 ton L = 25 D real = 0.4 m D equiv= 0.45 m ML = 80 tm MB = 60 tm 4D = 1.6 1. Menghitung ukuran pile cape s l = 2D = 0.9 m s b = 2D = 0.9 m Lg = = 5.8 Bg = = 2.2 Ukuran poer L = Lg + 2D = 6.6 m Ukuran poer B = Bg + 2D = 3m kontrol taling n1 = 3 n2 = 7 kontrol taling= 0.606305 group pile 2. Menghitung beban yang dipikul masing2 tiang pancang n = 21 MB = 60 ML = 80 N = 600 N = n = ML = s x ƩX² = MB = 1 600 21 80 3 2.7 29 60 2 600 21 80 2 1.8 29 60 3 600 21 80 1 0.9 29 60 4 600 21 80 0 0 29 60 5 600 21 80 1 0.9 29 60 6 600 21 80 2 1.8 29 60 7 600 21 80 3 2.7 29 60 Ʃs + 1 D Ʃs + 1 D

description

Perhitungan Tiang Pancang Group Pile

Transcript of Perhitungan Tiang Pancang Group Pile

Page 1: Perhitungan Tiang Pancang Group Pile

Diketahui data tanah dan hasil uji triaxial seperti gambar di bawah ini.

N = 600 ton L = 25D real = 0.4 mD equiv= 0.45 mML = 80 tmMB = 60 tm4D = 1.6

1. Menghitung ukuran pile cape

s l = 2 D = 0.9 ms b = 2 D = 0.9 m

Lg = = 5.8

Bg = = 2.2

Ukuran poer L = Lg + 2D

= 6.6 mUkuran poer B = Bg + 2D

= 3 m

kontrol talingn1 = 3n2 = 7kontrol taling= 0.606305 group pile

2. Menghitung beban yang dipikul masing2 tiang pancangn = 21MB = 60ML = 80N = 600

N = n = ML = s x ƩX² = MB =1 600 21 80 3 2.7 29 602 600 21 80 2 1.8 29 603 600 21 80 1 0.9 29 604 600 21 80 0 0 29 605 600 21 80 1 0.9 29 606 600 21 80 2 1.8 29 607 600 21 80 3 2.7 29 60

Ʃs + 1 D

Ʃs + 1 D

Page 2: Perhitungan Tiang Pancang Group Pile

8 600 21 80 3 2.7 29 609 600 21 80 2 1.8 29 60

10 600 21 80 1 0.9 29 6011 600 21 80 0 0 29 6012 600 21 80 1 0.9 29 6013 600 21 80 2 1.8 29 6014 600 21 80 3 2.7 29 6015 600 21 80 3 2.7 29 6016 600 21 80 2 1.8 29 6017 600 21 80 1 0.9 29 6018 600 21 80 0 0 29 6019 600 21 80 1 0.9 29 6020 600 21 80 2 1.8 29 6021 600 21 80 3 2.7 29 60

Q MAKS = 40.30542Q MIN = 16.83744

3. Menghitung daya dukung keseimbangan (Qg)n = 21f = --------> c = 7.5 75 = 4.725 t/m²

0 ° -----> Nc = 5.14Depth/Kedlman = 25 mBg = 2.2Lg = 5.8

Qg = ((2D x (Bg + Lg) x f) + (1,3 x c x Nc x Bg x Lg) 2529.467 Ton

Sf = 3Qgs = 843.1558 > Q=N = 600 AMAN

4. Kapasitas /kekuatan satu tiang pancangQ ult = Q frict + Q tip

Q frict = = 166.9106

Q tip = C x Nc x A tip = 6.168 ton

Q ult = Q frict + Q tip = 173.0786

α c t/m² =

Ø =

f x ( π . D ) X L

Page 3: Perhitungan Tiang Pancang Group Pile

Q is = Q ult / SF = 57.69288 Jadi Qis = 57.69288 > Q maks = 40.30542

5 kontrol efisiensiefisiensi group Eg=

arc tan d/s = 26.33 °n1= 3n2= 7

Eg= 55 %

Q all = Q is x Eg x n = 671.4425 ton > Q =N 600

prosentase selisih antara Q all dan N (10 s/d 20%)

prosentase = 11.90708 %

L Pile = 25 m0.75

2/3 L = 16.66667

Hmat = 3 1.986667 m z1 = 0.993333h2 = 6.933333 1.986667 m z2 = 2.98H = 9.933333 1.986667 m z3 = 4.966667

1.986667 m Z4 = 6.9533331.986667 m z5 = 8.94

b. Menghitung tegangan efektig tanah

= 13.245

σv1 + (ϒd x (z2-z1)) = 14.735

= 16.225

σv3 + (ϒd x (z4-z3)) = 17.715

σv4 + (ϒd x (z5-z4)) = 19.205

Ø =

ϒd =

Δh1 =

Δh2 =

Δh3 =

Δh4 =

Δh5 =

σv1 = (ϒd x 2/3L) + (ϒd x z1)

σv2 =

σv3 = σv3 + ((ϒd x (z3-z2))

σv4 =

σv4 =

1−Ø ( −1 + −1 )/(90 )(� )� � (� )� � � � �

1−Ø ( −1 + −1 )/(90 )=(� )� � (� )� � � � �

Page 4: Perhitungan Tiang Pancang Group Pile

A1 = 21.69338A2 = 45.4804A3 = 77.16111A4 = 116.7355A5 = 164.2036

27.6582113.1925

7.7759385.139824

3.6543.4.3 Menhitung tegangan angka pori

Cc = 0.82

0.4015580.2276990.1394360.0907220.0620270.921443

3.4.4 Menghitung Sce = 2.65

0.2185650.1239350.0758940.0493790.0337610.501534 m = 50.1534 cm

3.4.5 Menghitung waktu penurunanCv = 0.00015 cm/detiku = 0.9Tv = 0.848H = 993.3333 cmt1 = 176.8838t2 = 53.06513total = 229.9489

3.4.6 menghitung settlement of immediateE lempung sedang = 90

0.5Lg/ Bg = 2.636364 → Ip = 0.73

Si = 0.539421 m - 53.94209 cm

3.4.7 menghitung Ss

c. Menghitung penyebaran tegangan tanah (Δp)

Δp1 =Δp2 =Δp3 =Δp4 =Δp5 =

Δe1 =Δe2 =Δe3 =Δe4 =Δe5 =Ʃδe =

ΔSc 1 =

ΔSc 2 =

ΔSc 3 =

ΔSc 4 =

ΔSc 5 =

ƩSc =

µ lempung jenuh =

Page 5: Perhitungan Tiang Pancang Group Pile

H = 9.933333 mep = 2.375

-1.762249Ss = 2.711999

3.4.8 menghitung S totalS total = 3.752954 m

Cα =

Page 6: Perhitungan Tiang Pancang Group Pile

s Y ƩY² = Arah ML Arah MB1 0.9 12.6 1 - +1 0.9 12.6 2 - +1 0.9 12.6 3 - +1 0.9 12.6 4 + +1 0.9 12.6 5 + +1 0.9 12.6 6 + +1 0.9 12.6 7 + +

Page 7: Perhitungan Tiang Pancang Group Pile

0 0 12.6 8 - +0 0 12.6 9 - +0 0 12.6 10 - +0 0 12.6 11 + +0 0 12.6 12 + +0 0 12.6 13 + +0 0 12.6 14 + +1 0.9 12.6 15 - -1 0.9 12.6 16 - -1 0.9 12.6 17 - -1 0.9 12.6 18 + -1 0.9 12.6 19 + -1 0.9 12.6 20 + -1 0.9 12.6 21 + -

alfa 0.63

selisih = 40.52597

KN/m²

Page 8: Perhitungan Tiang Pancang Group Pile

ton ----> aman

Page 9: Perhitungan Tiang Pancang Group Pile
Page 10: Perhitungan Tiang Pancang Group Pile
Page 11: Perhitungan Tiang Pancang Group Pile

Q x y25.450 43.74 11.3427.892 19.4430.374 4.8632.857 68.0435.34037.82340.305

Page 12: Perhitungan Tiang Pancang Group Pile

21.12323.60626.08928.57131.05433.53736.02016.83719.32021.80324.28626.76829.25131.734

Page 13: Perhitungan Tiang Pancang Group Pile
Page 14: Perhitungan Tiang Pancang Group Pile
Page 15: Perhitungan Tiang Pancang Group Pile