Perhitungan Gempa Arah Melintang

download Perhitungan Gempa Arah Melintang

of 50

Transcript of Perhitungan Gempa Arah Melintang

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    1/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    TUGAS MATA KULIAH TEKNIK GEMPA

    140

    550

    550

    550

    550

    140

    140 550 250 550 140

    DENAH

    140 550 250 550 140

    q2 = 1,2

    25/50 25/45 25/50

    400 K2 =35/35 K2 K2 35/35 atapq1 = 2,2

    25/50 25/45 25/50400 K2 K2 K2 35/35

    lantai 4q1 = 2,2

    25/50 25/45 25/50

    400 K1=45/45 K1 K1 45/45lantai 3q1 2,2

    25/50 25/45 25/50400 K1 K1 K1 45/45

    lantai 2q1 = 2,2

    25/50 25/45 25/50K1=45/45 K1 K1 45/45

    lantai 1550 q1 = 2,2

    POTONGAN PORTAL MELINTANG

    Nuki Saeful/020191/S1 Teknik Sipil 1

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    2/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Peruntukan : Perkantoran

    Letak : Jakarta

    Keadaan tanah : Jelek

    Dinding : Partisi

    langit-langit : Eternit

    Penutup Lantai : Keramik

    Atap : Pelat beton ditutup aspal + pasir

    PENYELESAIAN :

    0.2 wilayah 3

    0.1

    0.07 lunakkeras

    0.05

    0.5 1 2 3Waktu getar

    Beton tanpa dinding getar

    T = 0,06 H 3/4

    = 0.06 (21,5)3/4 = 0,60

    Dari Grafik

    T = 0,60 C = 0,05

    Beton Bertulang, k = 1

    Cd= C . I .k

    = 0,05 .1 . 1 =0,05

    V = Cd . Wt

    = C . I .k . Wt

    KETERANGAN :

    Nuki Saeful/020191/S1 Teknik Sipil 2

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    3/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    l1

    (m)

    l2

    (m)

    l3

    (m)

    L2

    (m)

    h1

    (m)

    h2

    (m)

    q1

    kN/m2

    q2

    kN/m2

    b1

    (cm)

    b2

    (cm)

    k1

    (cm)

    k2

    (cm)

    1,4 5,5 2,5 5,5 5,5 4 2,2 1,2 25/50 25/45 45/45 35/35

    LANGKAH-LANGKAH PERHITUNGAN

    Perhitungan Pembebanan

    15

    35 50

    25

    15

    4530

    25

    1. Pelat Atap (tebal 15 cm)

    Berat Atap

    q1 = 24,8 m x 16,3 m x 0,15 m x 2400 kg/m3 =

    145526,4 kg

    Balok Melintang

    q2 = 10 x0,35 x0,25 x 5,5 x 2400 +5 x 0,30 x 0,25 x 2,5 x

    2400

    = 11550 + 2250 = 13800 kg

    Balok Memanjangq3 = 16 x 0,35 x 0,25 x 5,5 x 2400 =

    18480 kg

    Berat Langit-Langit dan Gantungan

    q4 = 22 x 13,5 x 18 = 5346 kg

    Penutup aspal + pasir ( + = 1 cm)

    q5 = 24,8 m x 16,3 m x 0,01 x 1400 =

    5659,36 kg

    Nuki Saeful/020191/S1 Teknik Sipil 3

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    4/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Berat air hujan tinggi 5 cmq6 = 24,8 m x 16,3 m x 0,05 x 1000 =

    20212 kg

    Beban hidup

    q7 = 24,8 m x 16,3 m x 120 x 0,3

    =14552,64 kg

    Total Q5 =223576,4kg

    18

    50

    32

    25

    1845

    27

    25

    2. lantai tingkat 4 (tebal 18 cm)

    Berat Pelatq1 = 24,8 m x 16,3 m x 0,18 x 2400 =

    174631,68 kg

    Berat Balok Melintang

    q2 = 10 x 0,25 x 0,32 x 5,5 x 2400 +5,5 x 0,25 x 0,27 x 2,5

    x 2400

    = 10560 + 2227,5 =

    12787,5 kg

    Nuki Saeful/020191/S1 Teknik Sipil 4

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    5/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Berat balok memanjang

    q3 = 16 x 0,25 x 0,27 x 5,5 x 2400 =14256 kg

    Berat plapond

    q4 = 22 x 13,5 x 18 = 5346 kg

    Keramik + adukan 5 cm

    q5 = 22 x 13,5 x 0,05 x 24 = 356,4 kg

    Total Q4=207377,58 kg

    Berat Kolom

    q6 = 20 x 0,35 x 0,35 x 4 x 2400 = 5880

    kg

    Beban hidup

    q7 = 22 x 13,5 x 220 x 0,3 = 19602 kg

    Total Q4 =

    232859,58 kg

    3. Lantai Tingkat 3

    Total Q3 = Total Q4 = 232859,58 kg

    4. Lantai Tingkat 2

    Q2 = Q4= 207377,58 kg

    Kolom

    q1 = 20 x 0,45 m x 0,45 m x 4 m x 2400 kg/m3= 38880 kg

    Beban hidup

    q2 = 22 x 13,5 x 220 x 0,3 = 19602 kg

    Total Q2 =

    265859,58kg

    5. Lantai Tingkat 1

    Nuki Saeful/020191/S1 Teknik Sipil 5

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    6/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Total Q1 = Q2 = 265859,58 kg

    6. Lantai Dasar

    Kolom

    q16 = 20 x 0,45 m x 0,45 m x 5,5 m x 2400 kg/m3 =

    53460 kg

    Total Q0 = 53460

    kg

    Lantai Wi hi (m) Wi.hi

    atap 223576,4kg 21,5 4806892,6

    4232859,58

    kg 17,5 4075042,65

    3232859,58

    kg 13,5 3143604,33

    2 265859,58kg 9,5 2525666,01

    1 265859,58kg 5,5 1462227,69

    0 53460 kg 0 0

    Wi = Wt=1274474,

    72 Wi.hi

    =16013433

    ,28

    Vt = Cd . Wt = 0,05 x 1274474,72= 63723,736 kg

    (Setiap portal menerima gaya V sebanyakn

    Vt, n = jumlah

    portal)

    Beban Horizontal terpusat pada masing-masing lantai,

    vhiWi

    hiWiFi

    .

    .

    =

    Nuki Saeful/020191/S1 Teknik Sipil 6

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    7/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Fatap = kgx 512,19128736,63723816013433,2

    4806892,6=

    F4 = kgx 194,16216736,63723816013433,2

    4075042,65=

    F3 = kgx 635,12509736,63723816013433,2

    3143604,33=

    F2 = kgx 616,10050736,63723816013433,2

    2525666,01=

    F1 = kgx 778,5818736,63723816013433,2

    1462227,69=

    Gaya geser tingkat Qi

    F5 Q5

    Q5 = F5 = kg512,19128F4 Q4

    Q4 = F5 + F4 =35344,706

    F3

    Q3 Q3 = Q4 + F3 =47854,341kg

    F2

    Q2 Q2 = Q3 + F2 = 57904,957kg

    F1 Q1 Q1 = Q2 + F1 = 63723,735kg

    I. Portal Melintang

    1. Menghitung D Value

    Tingkat 1

    Nuki Saeful/020191/S1 Teknik Sipil 7

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    8/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Kolom Tepi

    k1

    kc

    EkcaDD

    k

    ka

    kc

    kk

    E

    E

    L

    EIkc

    E

    E

    L

    EIk

    1,1143E0,46.2485.4111

    0,460,82

    0,85,0

    2

    5,0

    8,0~76,01

    2485550

    )45.(45.12

    1.4

    4

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ====

    =+

    +=

    +

    +=

    ==

    ===

    ===

    Kolom tengah

    k1 k2

    kc

    Ekc

    E

    E

    L

    EIk

    Ek

    2485

    68,1380550

    )45.(25.12

    1.4

    42

    18931

    3

    =

    ===

    =

    Nuki Saeful/020191/S1 Teknik Sipil 8

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    9/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kgkgEEQ

    D

    DG

    E

    EQ

    D

    DG

    EEDi

    EkcaDD

    k

    ka

    kc

    kkk

    i

    65,3047735,63723.22862

    4,10931..11

    2121

    kg3047,65kg63723,735.22862

    4,10931.

    .11

    1111

    1lantaipinggirkolomsetiappadageserGaya

    228621,1143.201

    4,109324850,44..3121

    0,440,662

    0,665,0

    2

    5,0

    66,04970

    68,3273

    2

    21

    20

    1

    ====

    ===

    ==

    ====

    =+

    +=

    +

    +=

    ==+

    =

    =

    Tingkat 2

    Kolom Tepi

    k1

    kc

    k2

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    19,3417400

    )45.(45.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ===

    =

    ===

    EkcaDD

    k

    ka

    kc

    kkk

    95,785E3417,18.0,23..4212

    0,236,02

    0,6

    2

    6,0~55,038,6834

    3786

    2

    21

    ====

    =+

    =+

    =

    ==

    +

    =

    Kolom tengah

    k1 k2

    Nuki Saeful/020191/S1 Teknik Sipil 9

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    10/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kck3 k4

    Ekc

    Ek

    Ek

    EkEk

    19,3417

    68,13604

    18933

    68,1360218931

    =

    =

    =

    ==

    kgE

    EQ

    D

    DGG

    kgE

    EQ

    Di

    DGG

    EEEDi

    EkcaDDk

    ka

    kc

    kkkkk

    i

    02,3369975,57904.5,18794

    50,10932.

    .12

    223222

    539,242157904,957.18794,5

    95,7852.

    .2

    124212

    5,18794)50,109395,785.(102

    50,109319.E0,32.3417,..3222

    0,320,952

    0,95

    2

    95,06834,38

    36,6507

    2

    4321

    20

    1

    ====

    ===

    =+=

    ====

    =

    +

    =

    +

    =

    ==+++

    =

    =

    Tingkat 3

    Kolom Tepi

    k1

    kc

    k2

    E

    E

    L

    EIkc

    Ek

    E

    E

    LEIk

    19,3417400

    )45.(45.12

    1.4

    4

    18932

    1893550

    )50.(25.

    12

    1.4

    41

    3

    3

    ===

    =

    ===

    Nuki Saeful/020191/S1 Teknik Sipil 10

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    11/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    EkcaDD

    k

    ka

    kc

    kkk

    95,785E3417,18.0,23..4313

    0,236,02

    0,6

    2

    6,0~55,038,6834

    3786

    2

    21

    ====

    =+

    =+

    =

    ==+

    =

    Kolom tengah

    k1 k2

    kck3 k4

    Ekc

    Ek

    Ek

    Ek

    Ek

    19,3417

    68,13604

    18933

    68,13602

    18931

    =

    =

    =

    =

    =

    kgE

    EQD

    DGG

    kgE

    EQ

    D

    DGG

    EEEDi

    EkcaDD

    k

    ka

    kc

    kkkk

    k

    i

    257,2784341,47854.5,18794

    50,10933..13

    233323

    18,2001341,47854.18794,5

    95,7853.

    .13

    134313

    5,18794)50,109395,785.(103

    50,109319.E0,32.3417,..3222

    0,320,952

    0,95

    2

    95,06834,38

    36,6507

    2

    4321

    20

    1

    ====

    ===

    =+=

    ====

    =+

    =+

    =

    ==

    +++

    =

    =

    Tingkat 4

    Kolom Tepi

    k1

    kc

    Nuki Saeful/020191/S1 Teknik Sipil 11

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    12/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    k2

    EkcaDD

    k

    ka

    kc

    kkk

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    72,537E1250,52.0,43..4414

    0,435,12

    1,5

    2

    5,1~51,104,2501

    3786

    2

    21

    52,1250400

    )35.(35.12

    1.4

    4

    18932

    1893550

    )50.(25.121.4

    41

    3

    3

    ====

    =+

    =+

    =

    ==+

    =

    ===

    =

    ===

    Kolom tengah

    k1 k2

    kck3 k4

    52,125068,13604

    18933

    68,13602

    18931

    ==

    =

    =

    =

    KcEk

    Ek

    Ek

    Ek

    Nuki Saeful/020191/S1 Teknik Sipil 12

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    13/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kgE

    EQ

    D

    DGG

    kgE

    EQ

    D

    DGG

    EEDi

    EkcaDD

    k

    ka

    kc

    kkkkk

    i

    32,1999706,35344.12380

    29,7004.

    .14

    243424

    18,153535344,706.12380

    72,5374.

    .14

    144414

    12380)29,70072,537.(104

    29,700E1250,520,56..3424

    0,562,602

    2,60

    2

    60,204,2501

    36,6507

    2

    4321

    1

    ====

    ====

    =+=

    ====

    =+

    =+

    =

    ==+++

    =

    =

    Tingkat 5

    Kolom Tepi

    k1

    kc

    k2

    EkcaDD

    k

    ka

    kc

    kkk

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    72,537E1250,52.0,43..4515

    0,435,12

    1,5

    2

    5,1~51,1

    04,2501

    3786

    2

    21

    52,1250400

    )35.(35.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ====

    =+

    =+

    =

    ==+

    =

    ===

    =

    ===

    Kolom tengah

    k1 k2

    Nuki Saeful/020191/S1 Teknik Sipil 13

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    14/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kck3 k4

    52,1250

    68,13604

    18933

    68,13602

    18931

    =

    =

    =

    =

    =

    Kc

    Ek

    Ek

    Ek

    Ek

    kgE

    EQD

    DGG

    kgE

    EQ

    D

    DGG

    EEDi

    EkcaDD

    k

    ka

    kc

    kkkk

    k

    i

    03,1082512,19128.12380

    29,7005..14

    243525

    84,830512,19128.12380

    72,5375.

    .14

    144515

    12380)29,70072,537.(105

    29,700E1250,520,56..3424

    0,562,602

    2,60

    2

    60,204,2501

    36,6507

    2

    4321

    1

    ====

    ====

    =+=

    ====

    =+

    =+

    =

    ==

    +++

    =

    =

    Kesimpulan

    Lantai G. geser kolom pinggir (kg) G. geser kolom tengah (kg)

    1

    2

    3

    4

    5

    3047,65

    2421,539

    2001,18

    1535,18

    830,84

    3047,65

    3369,02

    2784,257

    1999,32

    1082,03

    2. Menentukan Momen-Momen Ujung Kolom

    Nuki Saeful/020191/S1 Teknik Sipil 14

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    15/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    yh

    A

    B MB

    MA

    G AB h

    (1-y)h

    yh

    GAB bekerja pada titik balok AB y0 : ( tabel 1 ) k. muto

    MA = GAB ( 1-y ) h 1. jumlah tingkat bangunan

    MAB = GAB ( y. h ) 2. letak kolom

    Dimana y = y0 + y1 + y2 + y3 3. harga k

    Mencari y0bagian tingkat 5

    kkolom tepi Kolom tengah

    k- y0 k- y0

    1 0,8 0,65 0,66 0,70

    2 0,6 0,50 0,95 0,50

    3 0,6 0,45 0,95 0,45

    4 1,5 0,425 2,60 0,45

    5 1,5 0,375 2,60 0,375

    Y1 tergantung kekakuan balok atas + bawahnya ( tabel 2 )

    k1 k2 1 =43

    21

    kk

    kk

    +

    +terbawah y1 = 0

    kc 1 = 1 , y1 = 0

    k3 k4 jika ( k1 + k2) > ( k3 + k4 ) maka 1 =21

    43

    kk

    kk

    +

    +

    dan harga y1menjadi

    t kolom tepi Kolom tengah

    Nuki Saeful/020191/S1 Teknik Sipil 15

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    16/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    k k1+k2 k3+k4 a1 y1 k1+k2 k3+k4 a1 y1

    2 3786E 3786E 1 0 3253,68E 3253,68E 1 0

    3 3786E 3786E 1 0 3253,68E 3253,68E 1 04 3786E 3786E 1 0 3253,68E 3253,68E 1 0

    5 3786E 3786E 1 0 3253,68E 3253,68E 1 0

    harga y2, tergantung harga k

    ( table 3 )k. muto perbandigan tinggi kolom

    _ kolom teratas y1 = 0

    2 =h

    ha , ha = tinggi kolom di atasnya

    2 = 1, y2 = 0

    t

    kha h a2

    kolom tepi kolom tengah

    K y2 k- y2

    1 400 550 0,73 0,8

    -

    0,175 0,66 -0,25

    2 400 400 1 0,6 0 0,95 0

    3 400 400 1 0,6 0 0,95 0

    4 400 400 1 1,5 0 2,60 0

    Harga y3 - tergantung harga k

    ( table 3 ) - perbandingan tinggi kolom terhadap tinggi kolom bawah,

    3 =h

    hb

    - kolom terbawah y3 = 0

    - 3 = 1, y3 = 0

    t

    khb h a3

    kolom tepi kolom tengah

    k- Y3 k- Y3

    2 550 400 1,38 0,6 -0,05 0,95 --0,05

    3 400 400 1 0,6 0 0,95 0

    4 400 400 1 1,5 0 2,60 0

    5 400 400 1 1,5 0 2,60 0

    Nuki Saeful/020191/S1 Teknik Sipil 16

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    17/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Resume

    t

    k klm yo Y1 y2 y3 Y

    1 tp 0,65 0

    -

    0,175 0 0,475

    tgh 0,70 0 -0,25 0 0,45

    2 tp 0,50 0 0 -0,05 0,45tgh 0,50 0 0 -0,05 0,45

    3tp 0,45 0 0 0 0,45

    tgh 0,45 0 0 0 0,45

    4tp 0,425 0 0 0 0,425

    tgh 0,45 0 0 0 0,45

    5tp 0,375 0 0 0 0,375

    tgh 0,375 0 0 0 0,375

    3. Perhitungan Momen Di Ujung KolomTingkat 1

    h = 550 cm = 5,5 m

    a. Kolom tepi

    M bawah = G11 . y. h

    = kg3047,65 x 0,475 x 5,5

    = 7961,98 kg

    M atas = G11 . (1-y)h= kg3047,65 x (1 - 0475) x 5,5

    = 8800,09 kg

    b. Kolom tengah

    M bawah = G21 . y . h

    = kg65,3047 x 0,45 x 5,5

    = 7542,93 kg

    M atas = G21 . (1-y) .h

    Nuki Saeful/020191/S1 Teknik Sipil 17

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    18/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = kg65,3047 x (1 - 0,45) x 5,5

    = 9219,14 kgTingkat 2

    h = 400 cm =4 m

    a. Kolom tepi

    M bawah = G12 . y .h

    = kg539,2421 x 0,45 x 4

    = 4358,77

    M atas = G12 . (1-y). h

    = 2421,539 x (1 0,45) x 4

    = 5327,39

    b. Kolom tengah

    M bawah = G22 . y h

    = kg02,3369 x 0,45 x 4

    = 6064,24 kg

    M atas = G22 . (1-y) .h

    = kg02,3369 x (1 0,45) x 4

    = 7411,84

    Tingkat 3

    h = 400 cm = 4 m

    a. Kolom tepi

    M bawah = G13 . y . h

    = kg18,2001 x 0,45 x 4

    = 3602,12 kg

    M atas = G13 . (1-y) . h

    = 2001,18kg x (1 0,45) x 4

    = 4402,59 kg

    b. Kolom tengah

    M bawah = G23 . y . h

    = kg257,2784 x 0,45 x 4

    = 5011,66 kg

    Nuki Saeful/020191/S1 Teknik Sipil 18

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    19/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    M atas = G23 . (1-y) . h

    = 2784,257 x (1 0,45) x 4

    = 6125,36 kg

    Tingkat 4

    h = 400 cm = 4 m

    a. Kolom tepi

    M bawah = G14 . y . h

    = 18,1535 kg x 0,425 x 4

    = 2609,81 kg

    M atas = G14 . (1-y) .h

    = 1535,18 x (1 0,425) x 4

    = 3530,91

    b. Kolom tengah

    M bawah = G24 . y .h

    = kg32,1999 x 0,45 x 4

    = 3598,78 kg

    M atas = G24 . (1-y) . h

    = 1999,32 x (1 0,45) x 4

    = 4398,50 kg

    Tingkat 5

    h = 400 cm = 4 m

    a. Kolom tepi

    M bawah = G15 . y . h

    = kg84,830 x 0,375 x 4

    = 1246,26 kg

    M atas = G15 . (1-y) . h

    = 830,84 kg x (1 0,375) x 4

    = 2077,1 kg

    b. Kolom tengah

    M bawah = G25 . y . h

    = kg03,1082 x 0,375 x 4

    Nuki Saeful/020191/S1 Teknik Sipil 19

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    20/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = 1623,05 kg

    M atas = G25 . (1-y) . h

    = 1082,03 kg x ( 1- 0,375 ) x 4

    = 2705,08 kg

    4. Menentukan Momen Ujung Balok

    kolom

    kika

    kaka M

    kk

    kM

    += ; kolom

    kika

    kiki M

    kk

    kM

    += ; abKolom MMM +=

    Mb = Kolom Atas; Ma = Kolom Bawah

    Syarat Mij = 0

    Balok Tepi Balok Tengah

    i j = 0

    MKolomkkikka

    kkaMka

    +=

    MKolomkkakki

    kkiMkb

    +=

    1. Tingkat 1( satu )- balok tepi

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )4358,7709,8800.(1893

    1893+

    = 13158,86 Kg.M

    Mki = 0

    Nuki Saeful/020191/S1 Teknik Sipil

    Kki

    Mki

    Kka

    Mka

    20

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    21/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    - balok tengah

    Mka= Mkolomkk

    kkika

    ka +

    .

    = )6064,2414,9219.(189368,1380

    68,1380+

    +

    = 6445,79Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )6064,249219,14.(189368,1380

    1893

    ++

    = 8833,79 Kg.M

    2. Tingkat 2( dua )

    - balok tepi

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )3602,125327,39.(1893

    1893+

    = 8929,51 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )5011,667411,84.(

    189368,1380

    68,1380+

    +

    = 5292,41 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )5011,667411,84.(189368,1380

    1893+

    +

    = 7180,78 Kg.M

    3. Tingkat 3( tiga )

    Nuki Saeful/020191/S1 Teknik Sipil 21

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    22/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )2609,814402,59.(1893

    1893+

    = 8929,51 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )3598,786125,36.(189368,1380

    68,1380+

    +

    = 4142,48 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )3598,786125,36.(189368,1380

    1893+

    +

    = 5620,55Kg.M

    4. Tingkat 4( empat )

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )1246,263530,91.(1893

    1893+

    = 4777,17 Kg.M

    Mki = 0- balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )1623,054398,50.(189368,1380

    68,1380+

    +

    = 2565,18 Kg.M

    Nuki Saeful/020191/S1 Teknik Sipil 22

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    23/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = .189368,1380

    1893

    +)1623,054398,50( +

    =3480,46 Kg.M

    5. Tingkat 5( lima )

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )2077,1.(1893

    1893

    = 2077,1 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )2077,1.(

    189368,1380

    68,1380

    +

    = 884,84 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )1,2077.(189368,1380

    1893

    +

    = 1200,56 Kg.M

    Nuki Saeful/020191/S1 Teknik Sipil 23

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    24/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    5. Perhitungan Free Body Portal Melintang

    Tingkat 5

    Balok Tepi

    q = 120 kg/m

    A B

    5,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 330 + (-48,28) VB = 330 + 48,28

    = 281,72 kg = 378,28 kg

    Mx = VA . x qx2 Mx = 281,72(2,35) (120).(2,35)2

    = 662,04 331,35 = 330,69 kg.m

    mq

    VAx

    qxVAdx

    dMx

    35,2120

    72,281

    00

    ===

    ==

    Balok Tengah

    q = 120 kg/m

    A B

    3,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 210 + (-75,87) VB = 210 + 75,87

    = 134,13 kg = 285,87 kg

    Nuki Saeful/020191/S1 Teknik Sipil 24

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    25/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Mx = VA . x qx2 Mx = 134,13(1,12) (120).(1,12)2

    = 150,23 75,26 = 74,97 kg.m

    mq

    VAx

    qxVAdx

    dMx

    12,1120

    13,134

    00

    ===

    ==

    Tingkat 4

    Balok Tepi

    q = 220 kg/m

    A B

    5,5 m

    VA = ql -

    l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 605 + (-96,57) VB = 605 + 96,57

    = 508,43 kg = 701,57 kg

    Mx = VA . x qx2 Mx = 508,43(2,31) (220).(2,31)2

    = 1174,47 586,97 = 587,50 kg.m

    mq

    VAx

    qxVAdx

    dMx

    31,2220

    43,508

    00

    ===

    ==

    Nuki Saeful/020191/S1 Teknik Sipil 25

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    26/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Balok Tengah

    q = 220 kg/m

    A B

    3,5 m

    VA = ql - l

    MBMA +

    VB = ql - l

    MBMA +

    VA = 385 + (-151,75) VB = 385 + 151,75

    = 233,25 kg = 536,75 kg

    Mx = VA . x qx2 Mx = 233,25(1,06) (220).(1,06)2

    = 247,24 123,60 = 123,64 kg.m

    mq

    VAx

    qxVAdx

    dMx

    06,1220

    25,233

    00

    ===

    ==

    Tingkat 3

    Balok Tepi

    q = 220 kg/m

    A B

    5,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 605 + (-156,03) VB = 605 + 156,03

    = 448,97 kg = 761,03 kg

    Nuki Saeful/020191/S1 Teknik Sipil 26

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    27/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Mx = VA . x qx2 Mx = 448,97(2,04) (220).(2,04)2

    = 915,50 457,78 = 458,12 kg.m

    mq

    VAx

    qxVAdx

    dMx

    04,2220

    97,448

    00

    ===

    ==

    Balok Tengah

    q = 220 kg/m

    A B

    3,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 385 + (-245,19) VB = 385 + 245,19

    = 139,81 kg = 630,19 kg

    Mx = VA . x qx2 Mx = 139,81(0,64) (220).(0,64)2

    = 89,48 45,06 = 44,42 kg.m

    mq

    VAx

    qxVAdx

    dMx

    64,0220

    81,139

    00

    ===

    ==

    Tingkat 2

    Balok Tepi

    q = 220 kg/m

    A B

    5,5 m

    Nuki Saeful/020191/S1 Teknik Sipil 27

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    28/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 605 + (-215,49) VB = 605 + 215,49

    = 389,51 kg = 820,49 kg

    Mx = VA . x qx2 Mx = 389,51(1,77) (220).(1,77)2

    = 521,49 278,091 = 243,40 kg.m

    m

    q

    VAx

    qxVAdx

    dMx

    77,1

    220

    51,389

    00

    ===

    ==

    Balok Tengah

    q = 220 kg/m

    A B

    3,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 385 + (-338,63) VB = 385 + 338,63

    = 46,37 kg = 723,63 kg

    Mx = VA . x qx2 Mx = 46,37(0,22) (220).(0,22)2

    = 10,20 5,32 = 4,8 kg.m

    mq

    VAx

    qxVAdx

    dMx

    22,0220

    37,46

    00

    ===

    ==

    Nuki Saeful/020191/S1 Teknik Sipil 28

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    29/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Tingkat 1

    Balok Tepi

    q = 220 kg/m

    A B

    5,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 605 + (-183,17) VB = 605 + 183,17

    = 421,83 kg = 788,17 kg

    Mx = VA . x qx2 Mx = 421,83(1,92) (220).(1,92)2

    = 809,91 405,50 = 404,41 kg.m

    mq

    VA

    x

    qxVAdx

    dMx

    92,1220

    83,421

    00

    ===

    ==

    Balok Tengah

    q = 220 kg/m

    A B

    3,5 m

    VA = ql -l

    MBMA +VB = ql -

    l

    MBMA +

    VA = 385 + (-287,84) VB = 385 + 287,84

    = 97,16 kg = 672,84 kg

    Mx = VA . x qx2 Mx = 97,16(0,44) (220).(0,44)2

    = 42,75 21,30 = 21,45 kg.m

    Nuki Saeful/020191/S1 Teknik Sipil 29

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    30/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    mq

    VAx

    qxVAdx

    dMx

    44,0220

    16,97

    00

    ===

    ==

    Resume Free Body Portal Melintang

    Balok Tepi Balok Tengah Kantilever

    Tingkat VA VB xMx

    (kg.m) VA VB xMx

    (kg.m) kg.m

    5 281.72 378.28 2.35 330.69 134.13 285.87 1.12 74.97 72

    4 508.43 701.57 2.31 587.5 223.25 536.75 1.06 123.64 132

    3 448.97 761.03 2.04 458.12 139.81 630.19 0.64 44.42 132

    2 389.51 820.49 1.77 243.4 46.37 723.63 0.22 4.8 132

    1 421.83 788.17 1.92 404.41 97.16 672.84 0.44 21.45 132

    I. Portal Melintang

    Nuki Saeful/020191/S1 Teknik Sipil 30

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    31/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    1. Menghitung D Value

    Tingkat 1

    Kolom Tepi

    k1

    kc

    EkcaDD

    k

    ka

    kc

    kk

    E

    E

    L

    EIkc

    E

    E

    L

    EIk

    1,1143E0,46.2485.5111

    0,460,82

    0,85,0

    2

    5,0

    8,0~76,01

    2485550

    )45.(45.12

    1.4

    4

    1893

    550

    )50.(25.12

    1.4

    41

    3

    3

    ====

    =+

    +=

    +

    +=

    ==

    ===

    ===

    Kolom tengah

    k1 k2

    kc

    Ekc

    Ek

    Ek

    2485

    18932

    18931

    =

    =

    =

    Nuki Saeful/020191/S1 Teknik Sipil 31

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    32/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kgkgEEQ

    DDGGG

    E

    EQ

    D

    DGG

    EDi

    EkcaDDD

    k

    ka

    kc

    kkk

    i

    38,3115735,63723.22365

    4,10931..11

    21413121

    kg99,3256kg63723,735.22365

    1,11431.

    .11

    115111

    1lantaipinggirkolomsetiappadageserGaya

    22365)4,1093(10)1,1143.(101

    4,109324850,44..413121

    0,440,662

    0,665,0

    2

    5,0

    66,04970

    68,3273

    2

    21

    20

    1

    ======

    ====

    =+=

    =====

    =+

    +=

    +

    +=

    ==+

    =

    =

    Tingkat 2

    Kolom Tepi

    k1

    kc

    k2

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    19,3417400

    )45.(45.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ===

    =

    ===

    EkcaDD

    k

    ka

    kc

    kkk

    95,785E3417,18.0,23..5212

    0,236,02

    0,6

    2

    6,0~55,038,6834

    3786

    2

    21

    ====

    =+

    =+

    =

    ==

    +

    =

    Nuki Saeful/020191/S1 Teknik Sipil 32

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    33/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Kolom tengah

    k1 k2

    kck3 k4

    Ekc

    Ek

    Ek

    Ek

    Ek

    19,3417

    18934

    18933

    18932

    18931

    =

    =

    =

    =

    =

    kgE

    EQ

    D

    DGGG

    kgE

    EQ

    Di

    DGG

    EDi

    EkcaDDD

    k

    ka

    kc

    kkkkk

    i

    43,3355975,57904.84,20639

    02,11962.

    .12

    22423222

    98,2204975,57904.20639,84

    95,7852.

    .2

    125212

    84,20639)02,1196(12)95,785(82

    02,119619.E0,35.3417,..423222

    0,351,102

    1,10

    2

    10,16834

    7572

    2

    4321

    20

    1

    =====

    ===

    =+=

    =====

    =+

    =+

    =

    ==+++

    =

    =

    Tingkat 3

    Kolom Tepi

    k1

    kc

    k2

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    19,3417400

    )45.(45.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ===

    =

    ===

    Nuki Saeful/020191/S1 Teknik Sipil 33

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    34/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    EkcaDD

    k

    ka

    kc

    kkk

    95,785E3417,18.0,23..5313

    0,236,02

    0,6

    2

    6,0~55,038,6834

    3786

    2

    21

    ====

    =+

    =+

    =

    ==+

    =

    Kolom tengah

    k1 k2

    kck3 k4

    Ekc

    Ek

    Ek

    Ek

    Ek

    19,3417

    18934

    18933

    18932

    18931

    =

    =

    =

    =

    =

    kgE

    EQD

    DGGG

    kgE

    EQ

    D

    DGG

    Di

    EkcaDDD

    k

    ka

    kc

    kkkk

    k

    i

    02,2773341,47854.84,20639

    02,11963..13

    23433323

    23,1822341,47854.20639,84

    95,7853.

    .13

    135313

    84,20639)02,1196.(12)95,785.(83

    02,119619.E0,35.3417,..433222

    0,351,102

    1,10

    2

    10,16834,38

    7572

    2

    4321

    20

    1

    =====

    ===

    =+=

    =====

    =+

    =+

    =

    ==

    +++

    =

    =

    Tingkat 4

    Nuki Saeful/020191/S1 Teknik Sipil 34

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    35/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Kolom Tepi

    k1

    kc

    k2

    EkcaDD

    k

    ka

    kc

    kkk

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    72,537E1250,52.0,43..4414

    0,435,12

    1,5

    2

    5,1~51,104,2501

    3786

    2

    21

    52,1250400

    )35.(35.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ====

    =+

    =+

    =

    ==+

    =

    ===

    =

    ===

    Kolom tengah

    k1 k2

    kck3 k4

    52,1250

    18934

    18933

    18932

    18931

    =

    =

    =

    =

    =

    Kc

    Ek

    Ek

    Ek

    Ek

    Nuki Saeful/020191/S1 Teknik Sipil 35

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    36/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    kgE

    EQ

    D

    DGGG

    kgE

    EQ

    D

    DGG

    EEDi

    EkcaDDD

    k

    ka

    kc

    kkkkk

    i

    13,1993706,35344.48,13305

    31,7504.

    .14

    24443424

    40,142835344,706.48,13305

    72,5374.

    .14

    145414

    48,13305)31,750.(12)72,537.(84

    31,750E1250,520,60..443424

    0,603,032

    3,03

    2

    03,304,2501

    7572

    2

    4321

    1

    =====

    ====

    =+=

    =====

    =+

    =+

    =

    ==+++

    =

    =

    Tingkat 5

    Kolom Tepi

    k1

    kc

    k2

    EkcaDD

    k

    ka

    kc

    kkk

    E

    E

    L

    EIkc

    Ek

    E

    E

    L

    EIk

    72,537E1250,52.0,43..4515

    0,435,12

    1,5

    2

    5,1~51,1

    04,2501

    3786

    2

    21

    52,1250400

    )35.(35.12

    1.4

    4

    18932

    1893550

    )50.(25.12

    1.4

    41

    3

    3

    ====

    =+

    =+

    =

    ==+

    =

    ===

    =

    ===

    Nuki Saeful/020191/S1 Teknik Sipil 36

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    37/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Kolom tengah

    k1 k2

    kck3 k4

    52,1250

    18934

    18933

    18932

    18931

    =

    =

    =

    =

    =

    Kc

    Ek

    Ek

    Ek

    Ek

    kgE

    EQ

    D

    DGGG

    kgE

    E

    QD

    D

    GG

    EEDi

    EkcaDDD

    k

    ka

    kc

    kkkkk

    i

    68,1078512,19128.48,13305

    31,7505.

    .14

    24453525

    05,773512,19128.48,13305

    72,537

    5..14

    14

    4515

    48,13305)31,750.(12)72,537.(85

    31,750E1250,520,60..453424

    60,03,032

    3,03

    2

    03,304,2501

    7572

    2

    4321

    1

    =====

    ====

    =+=

    =====

    =+

    =+

    =

    ==+++

    =

    =

    Kesimpulan

    Lantai G. geser kolom pinggir (kg) G. geser kolom tengah (kg)

    1

    2

    3

    4

    5

    3256,99

    2204,98

    1822,23

    1428,40

    773,05

    3115,38

    3355,43

    2773,02

    1993,13

    1078,68

    2. Menentukan Momen-Momen Ujung Kolom

    Nuki Saeful/020191/S1 Teknik Sipil 37

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    38/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    yh

    A

    B MB

    MA

    G AB h

    (1-y)h

    yh

    GAB bekerja pada titik balok AB y0 : ( tabel 1 ) k. muto

    MA = GAB ( 1-y ) h 1. jumlah tingkat bangunan

    MAB = GAB ( y. h ) 2. letak kolom

    Dimana y = y0 + y1 + y2 + y3 3. harga k

    Mencari y0bagian tingkat 5

    kkolom tepi Kolom tengah

    k- y0 k- y0

    1 0,8 0,65 0,66 0,70

    2 0,6 0,50 1,10 0,50

    3 0,6 0,45 1,10 0,455

    4 1,5 0,425 3,03 0,452

    5 1,5 0,375 3,03 0,45

    Y1 tergantung kekakuan balok atas + bawahnya ( tabel 2 )

    k1 k2 1 =43

    21

    kk

    kk

    +

    +terbawah y1 = 0

    kc 1 = 1 , y1 = 0

    k3 k4 jika ( k1 + k2) > ( k3 + k4 ) maka 1 =21

    43

    kk

    kk

    +

    +

    dan harga y1menjadi

    t

    k

    kolom tepi Kolom tengah

    k1+k2 k3+k4 a1 y1 k1+k2 k3+k4 a1 y1

    2 3786 3786 1 0 3786 3786 1 0

    Nuki Saeful/020191/S1 Teknik Sipil 38

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    39/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    3 3786 3786 1 0 3786 3786 1 0

    4 3786 3786 1 0 3786 3786 1 0

    5 3786 3786 1 0 3786 3786 1 0

    harga y2, tergantung harga k

    ( table 3 )k. muto perbandigan tinggi kolom

    _ kolom teratas y1 = 0

    2 =h

    ha , ha = tinggi kolom di atasnya

    2 = 1, y2 = 0

    t

    kha h a2

    kolom tepi kolom tengah

    K y2 k- Y2

    1 400 550 0,73 0,8

    -

    0,175 0,66 -0,5

    2 400 400 1 0,6 0 1,10 0

    3 400 400 1 0,6 0 1,10 0

    4 400 400 1 1,5 0 3,03 0

    Harga y3 - tergantung harga k

    ( table 3 ) - perbandingan tinggi kolom terhadap tinggi kolom bawah,

    3 =h

    hb

    - kolom terbawah y3 = 0

    - 3 = 1, y3 = 0

    t

    khb h a3

    kolom tepi kolom tengah

    k- Y3 k- Y3

    2 550 400 1,38 0,6 -0,05 1,10 0

    3 400 400 1 0,6 0 1,10 0

    4 400 400 1 1,5 0 3,03 0

    5 400 400 1 1,5 0 3,03 0

    Resume

    Nuki Saeful/020191/S1 Teknik Sipil 39

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    40/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    t

    k klm yo Y1 y2 y3 Y

    1 tp 0,65 0

    -

    0,175 0 0,475

    tgh 0,70 0 -0,5 0 0,20

    2tp 0,50 0 0 -0,05 0,45

    tgh 0,50 0 0 0 0,50

    3tp 0,45 0 0 0 0,45

    tgh 0,455 0 0 0 0,455

    4tp 0,425 0 0 0 0,425

    tgh 0,452 0 0 0 0,452

    5tp 0,375 0 0 0 0,375

    tgh 0,45 0 0 0 0,45

    3. Perhitungan Momen Di Ujung Kolom

    Tingkat 1

    h = 550 cm = 5,5 m

    a. Kolom tepi

    M bawah = G11 . y. h

    = kg99,3256 x 0,475 x 5,5

    = 8508,89 kg.m

    M atas = G11 . (1-y). h

    = kg99,3256 x (1 0,475) x 5,5

    = 9404,56 kg.m

    b. Kolom tengah

    M bawah = G21 . y . h

    = kg38,3115 x 0,20x 5,5

    = 3426,92 kg.m

    M atas = G21 . (1-y) .h

    = kg38,3115 x (1 - 0,20) x 5,5

    = 13707,67 kg.m

    Tingkat 2

    h = 400 cm =4 m

    a. Kolom tepi

    M bawah = G12 . y .h

    Nuki Saeful/020191/S1 Teknik Sipil 40

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    41/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = kg98,2204 x 0,45 x 4

    = 3968,96 kg.mM atas = G12 . (1-y). h

    = kg98,2204 x (1 0,45) x 4

    = 4850,96 kg.m

    b. Kolom tengah

    M bawah = G22 . y h

    = kg43,3355 x 0,50 x 4

    = 6710,86 kg.mM atas = G22 . (1-y) .h

    = kg43,3355 x (1 0,50) x 4

    = 6710,86 kg.m

    Tingkat 3

    h = 400 cm = 4 m

    a. Kolom tepiM bawah = G13 . y . h

    = kg23,1822 x 0,45 x 4

    = 3280,01 kg.m

    M atas = G13 . (1-y) . h

    = kg23,1822 x (1 0,45) x 4

    = 4008,91

    b. Kolom tengah

    M bawah = G23 . y . h

    = kg02,2773 x 0,455 x 4

    = 5046,89 kg.m

    M atas = G23 . (1-y) . h

    = kg02,2773 x (1 0,455) x 4

    = 6045,18 kg.m

    Nuki Saeful/020191/S1 Teknik Sipil 41

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    42/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Tingkat 4

    h = 400 cm = 4 m

    a. Kolom tepi

    M bawah = G14 . y . h

    = kg40,1428 x 0,425 x 4

    = 2428,28 kg.m

    M atas = G14 . (1-y) .h

    = kg40,1428 x (1 0,425) x 4

    = 3285,32 kg.m

    b. Kolom tengah

    M bawah = G24 . y .h

    = kg13,1993 x 0,452 x 4

    = 3603,58 kg.m

    M atas = G24 . (1-y) . h

    = kg13,1993 x (1 0,452) x 4

    = 4368,94 kg.m

    Tingkat 5

    h = 400 cm = 4 m

    a. Kolom tepi

    M bawah = G15 . y . h

    = kg05,773 x 0,375 x 4

    = 1159,58 kg.m

    M atas = G15 . (1-y) . h

    = kg05,773 x (1 0,375) x 4

    = 1932,62 kg.m

    b. Kolom tengah

    M bawah = G25 . y . h

    = kg68,1078 x 0,45 x 4

    = 1941,62 kg.m

    M atas = G25 . (1-y) . h

    Nuki Saeful/020191/S1 Teknik Sipil 42

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    43/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = kg68,1078 x ( 1- 0,45 ) x 4

    = 2373,31 kg.m

    E. MENENTUKAN MOMEN UJUNG BALOK

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    Mki= Mkolomkk

    k

    kika

    ki +

    .

    1. Tingkat 1( satu )

    - balok tepi

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )56,396856,9404.(1893

    1893+

    = 13373,12 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )86,671062,13707.(18931893

    1893+

    +

    = 10209,24 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    Nuki Saeful/020191/S1 Teknik Sipil 43

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    44/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = )86,671062,13707.(18931893

    1893+

    +

    = 10209,24 Kg.M

    2. Tingkat 2( dua )

    - balok tepi

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )01,328096,4850.(1893

    1893+

    = 8130,97 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )89,504686,6710.(

    18931893

    1893+

    += 5878,87Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )89,504686,6710.(18931893

    1893+

    +

    = 5878,87 Kg.M

    3. Tingkat 3( tiga )

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )28,482891,4008.(1893

    1893+

    = 8867,19 Kg.M

    Nuki Saeful/020191/S1 Teknik Sipil 44

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    45/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )58,360318,6045.(18931893

    1893+

    +

    = 4824,38 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki

    + .

    = )58,360318,6045.(18931893

    1893+

    +

    = 4824,38 Kg.M

    4. Tingkat 4( empat )

    Mka= Mkolom

    kk

    k

    kika

    ka

    +

    .

    = )58,115932,3285.(1893

    1893+

    = 4444,9 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    kkika

    ka +

    .

    = )62,194194,4368.(18931893

    1893+

    +

    = 3155,28 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    Nuki Saeful/020191/S1 Teknik Sipil 45

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    46/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    = )62,194194,4368.(18931893

    1893+

    +

    = 3155,28 Kg.M

    5. Tingkat 5( lima )

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )2077,1.(

    1893

    1893

    = 2077,1 Kg.M

    Mki = 0

    - balok tengah

    Mka= Mkolomkk

    k

    kika

    ka +

    .

    = )2077,1.(189368,1380

    68,1380

    +

    = 884,84 Kg.M

    Mki = Mkolomkk

    k

    kika

    ki +

    .

    = )1,2077.(189368,1380

    1893

    +

    = 1200,56 Kg.M

    0.028 0.06 0.009 0.071 0.071 0.0090.062 0.028

    17 18 1920

    0.166 0.035 0.044 0.153 0.153 0.044

    0.035 0.166

    Nuki Saeful/020191/S1 Teknik Sipil 46

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    47/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    13 14 1516

    1.991 0.049 0.043 0.151 0.151 0.0430.049 0.199 9 1011 12

    0.199 0.036 0.043 0.151 0.151 0.0430.036 0.199

    5 6 7 8

    0.23 0.049 0.059 0.21 0.21 0.0590.049 0.23

    1 2 34

    F. MENENTUKAN MOMENT MAX

    1.MOMENT MAX BALOK TEPI (Tingkat 1)

    Ma = -7102 Mb = 9268.9

    A B

    Ra 5,5 m Rb

    MB = 0

    Nuki Saeful/020191/S1 Teknik Sipil 47

    q = 220 kg

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    48/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    L

    MbMaql

    Ra

    MbMaqlLRa

    +

    =

    =+

    2

    2

    2

    1

    02

    1

    .

    5,5

    9,926871025,5.2202

    1 2+

    =Ra = 211 Kg

    MV = 0

    Ra + Rb (q.L) = 0Rb = (q.L) Ra

    Rb = 1210 211 = 999 kg

    mq

    Rax

    xqRa

    dx

    dMx

    qxxRa

    96.0220211

    0.

    0

    02

    1. 2

    ===

    =

    =

    =

    x = 0.96 m maka,

    Kgm

    qxxRaM

    2,10196,0.220.2

    196,0.211

    2

    1.max

    2

    2

    =

    =

    2.MOMENT MAX BALOK TENGAH (Tingkat 1)

    MB = 0

    Nuki Saeful/020191/S1 Teknik Sipil

    q = 220 kg

    3,5

    48

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    49/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    L

    MbMaql

    Ra

    MbMaqlLRa

    +

    =

    =+

    2

    2

    2

    1

    02

    1.

    5,3

    5,80915,80915,3.2202

    1 2+

    =Ra = 385 Kg

    MV = 0

    Ra + Rb (q.L) = 0

    Rb = (q.L) Ra

    Rb = 770 385 = 385 kg

    mq

    Ra

    x

    xqRa

    dx

    dMx

    qxxRa

    75,1220

    385

    0.

    0

    02

    1. 2

    ===

    =

    =

    =

    x = 1,75 m maka,

    Kgm

    qxxRaM

    9,33675,1.385.2

    175,1.385

    2

    1.max

    2

    2

    =

    =

    Dengan perhitungan yang sama Moment maksimun didapat, pada table ini :

    FREE BODY

    tingkat BALOKM balok

    q L q.L

    Gayavertikal x M max

    ki ka RA RB

    1tepi -7102 9268.9 220 5.5 1210 211 999 0.96 101.2

    tengah -8091.5 8091.5 220 3.5 770 385 385 1.75 336.9

    2tepi -4394.2 9108.3 220 5.5 1210 -252 1462 -1.15 144.5

    tengah -7951.3 7951.3 220 3.5 770 385 385 1.75 336.9

    3tepi -3650 7505.8 220 5.5 1210 -96 1306 -0.44 21

    tengah -6604.7 6604.7 220 3.5 770 385 385 1.75 336.9

    4tepi

    -2704.9 5364 220 5.5 1210 122 1088 0.55 33.6tengah -4692.6 4692.6 220 3.5 770 385 385 1.75 336.9

    Nuki Saeful/020191/S1 Teknik Sipil 49

  • 8/2/2019 Perhitungan Gempa Arah Melintang

    50/50

    Dosen : Drs.Budi Kudwadi

    Tugas Terstuktur Teknik Gempa

    5tepi 1505.4 1612.1 120 5.5 660 -237 897 -1.97 233.7

    tengah -2289 2289 120 3.5 420 210 210 1.75 183.8