PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT) RUAS JALAN SEPUTIH BANYAK RUMBIA KABUPATEN LAMPUNG TENGAH PROVINSI LAMPUNG SKRIPSI OLEH DONI PRASETYO NPM. 15510008 TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH METRO 2020

Transcript of PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan...

Page 1: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT) RUAS JALAN SEPUTIH BANYAK – RUMBIA

KABUPATEN LAMPUNG TENGAH PROVINSI LAMPUNG

SKRIPSI

OLEH

DONI PRASETYO

NPM. 15510008

TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH METRO 2020

Page 2: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten
Page 3: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT) RUAS JALAN SEPUTIH BANYAK – RUMBIA

KABUPATEN LAMPUNG TENGAH PROVINSI LAMPUNG

SKRIPSI

Diajukan Untuk Memenuhi Salah Satu Persyaratan Dalam Menyelesaikan Program Sarjana Teknik Sipil

Universitas Muhammadiyah Metro

DONI PRASETYO

NPM. 15510008

TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH METRO 2020

Page 4: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

ABSTRAK

Prasetyo Doni. 2020. Perencanaan Struktur Perkerasan Kaku (Rigid Pavement) Ruas Jalan Seputih Banyak – Rumbia Kabupaten Lampung Tengah Provinsi Lampung. Skripsi. Program Studi Teknik Sipil, Fakultas Teknik.

Universitas Muhammadiyah Metro. Pembimbing (1) Leni Sriharyani, S.T., M.T, Pembimbing (2) Septyanto Kurniawan, S.T., M.T.

Kata Kunci : AASHTO 1993, Bina Marga 2017, Perkerasan Kaku.

Perencanaan peningkatan jalan merupakan salah satu upaya untuk

mengatasi permasalahan lalu lintas. Sehubungan dengan permasalahan lalu lintas, maka diperlukan penambahan kapasitas jalan yang tentu akan memerlukan metoda efektif dalam perancangan maupun perencanaan agar diperoleh hasil yang terbaik dan ekonomis, tetapi memenuhi unsur kenyamanan, keamanan dan keselamatan pengguna jalan.

Perencanaan struktur perkerasan kaku (rigid pavement) yang sesuai

dengan kebutuhan baik dari segi keamanan, dan kekuatan pada ruas jalan tersebut menggunakan Metode Bina Marga 2017 dan AASHTO 1993.

Langkah awal penelitian dilakukan dengan cara pengukuran panjang Jalan, Lebar Jalan, Bahu Jalan untuk mengetahui kondisi existing jalan tersebut, kemudian Survei Lalu Lintas (LHR) untuk mengetahui volume dan jenis kendaran dan survei pengambilan sampel tanah dengan menggunakan Alat Hand Bor selanjutnya dilakukan uji sampel tanah di laboratorium untuk mengetahui nilai CBR tanah dasar, kemudian data–data tersebut akan digunakan untuk ke proses perhitungan menggunakan Metode Bina Marga 2017 dan AASHTO 1993.

Tebal struktur perkerasan kaku ruas jalan seputih banyak – rumbia kabupaten lampung tengah provinsi lampung menggunakan metode bina marga 2017 diperoleh tebal plat beton sebesar 22 cm, tebal lantai kerja/lean mix concrete sebesar 12,5 cm, sedangkan menggunakan metode AASHTO 1993 diperoleh tebal plat beton sebesar 24 cm, tebal lantai kerja/lean mix concrete sebesar 12,7 cm.

Page 5: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

RINGKASAN

Prasetyo Doni. 2020. Perencanaan Struktur Perkerasan Kaku (Rigid Pavement) Ruas Jalan Seputih Banyak – Rumbia Kabupaten Lampung Tengah Provinsi Lampung. Skripsi. Program Studi Teknik Sipil, Fakultas Teknik.

Universitas Muhammadiyah Metro. Pembimbing (1) Leni Sriharyani, S.T., M.T, Pembimbing (2) Septyanto Kurniawan, S.T., M.T.

Kata Kunci : AASHTO 1993, Bina Marga 2017, CBR, Perkerasan Kaku..

Ruas jalan dari Jalan Seputih Banyak menuju ke arah Rumbia yang

terletak di Kabupaten Lampung Tengah Provinsi Lampung, adalah ruas jalan yang banyak dilalui oleh kendaraan truk serta fuso dengan kapasitas tonase berat yang mengangkut hasil panen Singkong, Karet, udang dari tambak bratasena dan lain - lain yang akan di kirimkan ke luar daerah, serta barang dagangan baik berupa truk-truk besar dan mobil pick up yang akan menuju ke pasar rumbia, gaya baru, dan penyebrangan ke bratasena untuk berdagang, di samping itu juga banyak mobil pribadi dan bus para penumpang daerah yang sering keluar masuk lewat wilayah tersebut, serta seringnya badan jalan wilayah tersebut tergenang oleh air hujan pada saat musim penghujan karena faktor topografi wilayah tersebut.

Tujuan dari penelitian ini adalah untuk Mengetahui nilai CBR tanah asli pada lokasi penelitian berdasarkan pengujian CBR Laboratorium untuk mendapatkan nilai Daya Dukung Tanah pada jalan tersebut, mendapatkan hasil perencanaan struktur perkerasan kaku (rigid pavement) yang sesuai dengan

kebutuhan baik dari segi keamanan, dan kekuatan pada ruas jalan tersebut menggunakan Metode Bina Marga 2017 dan AASHTO 1993 dan Mengetahui hasil perbandingkan biaya antara Metode Bina Marga 2017 dan AASHTO 1993

Metode penelitian yang dilakukan dengan cara pengukuran panjang Jalan, Lebar Jalan, Bahu Jalan untuk mengetahui kondisi existing jalan tersebut, kemudian Survei Lalu Lintas (LHR) untuk mengetahui volume dan jenis kendaran dan survei pengambilan sampel tanah dengan menggunakan Alat Hand Bor selanjutnya dilakukan uji sampel tanah di laboratorium untuk mengetahui nilai CBR tanah dasar, kemudian data–data tersebut akan digunakan untuk ke proses perhitungan menggunakan Metode Bina Marga 2017 dan AASHTO 1993.

Hasil analisis dan perhitungan Tebal struktur perkerasan kaku ruas jalan seputih banyak – rumbia kabupaten lampung tengah provinsi lampung menggunakan metode bina marga 2017 diperoleh tebal plat beton sebesar 22 cm, tebal lantai kerja/lean mix concrete sebesar 12,5 cm, sedangkan menggunakan metode AASHTO 1993 diperoleh tebal plat beton sebesar 24 cm, tebal lantai kerja/lean mix concrete sebesar 12,7 cm. Biaya kontruksi metode

bina marga 2017 dengan panjang jalan 1000 m dan lebar jalan 6 m adalah sebesar : Rp. 5.263.061.000,00 sedangkan Biaya kontruksi metode AASHTO 1993 dengan panjang jalan 1000 m dan lebar jalan 6 m adalah sebesar : Rp. 5.665.834.000,00.

Page 6: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PERSETUJUAN

Skripsi oleh DONI PRASETYO ini,

Telah diperbaiki dan disetujui untuk diuji

Metro, 18 Agustus 2020

Pembimbing I

;:iembimbing II

Page 7: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PENGESAHAN

Skripsi oleh DONI PRASETYO ini,

Telah dipertahankan di depan Tim Penguji

Pada tanggal '18 Agustus 2020

, Penguji II

- �0'2.fJ ...

Tim Penguj'

----!--1---+--------' Penguji I

Leni S�:r· • ., M.T.

4-��::1!111�

Page 8: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

MOTTO

~Balas Dendam Terbaik Adalah Menjadikan Dirimu Lebik Baik~

Ali Bin Abi Thalib

~Hidup Adalah Pilihan, Jika Kau Tidak Memilih, Maka Itu Pilihanmu~

Monkey D Luffy

~Cita – Cita Atau Kesuksesan Tidak Memandang Usia~

Deddy Corbuzier

~Seduh Kopimu Nikmati Hidupmu~

Doni Prasetyo

Page 9: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PERSEMBAHAN

Dengan mengucap syukur alhamdulilah kepada ALLAH SWT yang selalu

memberikan Rahmad dan Hidayah_Nya. Sehingga skripsi ini selesai dengan

berkah dan akan aku persembahkan maha karya ini kepada :

1. Kedua orang tua ku, yang sangat ku sayangi yang telah membimbing

dan selalu mendoakan untuk keberhasilan dan kesuksesan anak

nakalmu ini.

2. Saudaraku, kakak dan adikku yang senantiasa selalu memberikan

motifasi walau hanya sekedar ocehan tapi aku sayang kalian.

3. Seseorang paling istimewa yang menemaniku dari awal hingga saat

ini, terimakasih banyak.

4. Kepada saudaraku Teknik Sipil Universitas Muhammadiyah Metro,

Moh. Harizalsyah, Ega Armanda, Trio Zatmiko, Sigit Sugiarto, Iwan

Permadi, Galih Ramdhani, Sarifudin Ardi W, Dumeh Sa’adim, dan

teman-teman yang lainnya yang memberikan dorongan semangat

sampai selelsainya skripsi ini.

5. Kepada seniorku Teknik Sipil Universitas Muhammadiyah Metro :

Armian Barry, M. Tauhid, Nanang Bayu S, Fitriono, Ismu Prayitno,

Eko Wahu Hidayat, M. Holid, Suismail. Yang telah membantu secara

lahir dan batin penulis untuk menyelesaikan skripsi ini.

6. Kontrakan Club tempat biasa berbagi rasa dikala penulis merasa

gundah gulana, stres, kurang cairan, kurang darah, kurang asupan

nutrisi, kurang tidur dalam menyelesaikan maha karya ini.

7. Almamater Fakultas Teknik Universitas Muhammadiyah Metro.

Page 10: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xi

KATA PENGANTAR

Puji syukur penulis panjatkan kehadirat allah SWT. Yang telah

melimpahkan rahmat dan karunianya sehingga penulis dapat menyelesaikan

skripsi ini yang berjudul “Perencanaan Struktur Perkerasan Kaku (Rigid

Pavement) Ruas Jalan Seputih Banyak – Rumbia Kabupaten Lampung

Tengah Provinsi Lampung”

Dalam menyelesaikan penyusunan skripsi ini, penulis banyak menerima

saran, bimbingan dan bantuan dari berbagai pihak, karena itu pada kesempatan

ini penulis akan menyampaikan ucapan terimakasih kepada :

1. KMS. Ridhuan, S.T., M.Eng. selaku Dekan Fakultas Teknik Universitas

Muhamadiyah Metro.

2. Leni Sriharyani, S.T., M.T. selaku Ketua Prodi Teknik Sipil Universitas

Muhamadiyah Metro. Serta Selaku Dosen Pembimbing I

3. Septyanto Kurniawan., S.T, M.T. Selaku Dosen Pembimbing II

4. Seluruh dosen Fakultas Teknik yang telah memberikan ilmunya kepada

penulis selama di bangku perkulihan.

5. Teman-teman seperjuangan Teknik Sipil Angkatan 2015 yang telah

memberikan motivasi dan bantuan kepada penulis.

6. Semua pihak yang telah membantu penulis selama penyusunan skripsi

ini.

Dengan adanya skripsi ini, penulis berharap skripsi ini dapat bermanfa’at

bagi rekan – rekan maupun pihak – pihak lain yang membutuhkan khususnya

dalam bidang Teknik Sipil.

Metro, 2020 Penyusun, Doni Prasetyo Npm : 15510008

Page 11: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

PERNYATAAN TIDAK PLAGIAT

Saya yang bertanda tanqan di bawah ini :

Nama Lengkap : Doni Prasetyo

NPM : 12510027

XII

Metro, 27 Juli 2020

,

: Teknik

: Teknik Sipil

l)oni Prasetyo NPM. 15510008

Fakultas I Jurusan

Prodi

Menyatakan dengan sebenarnya bahwa skripsi saya yang berjudul :

Perencanaan Struktur Perkerasan Kaku (Rigid Pavement) Ruas Jalan

Seputih Banyak - Rumbia Kabupaten Lampung Tengah Provinsi Lampung,

Adalah benar - benar hasil karya sendiri, kecuali kutipan yang sudah saya

sebutkan sumbernya, dan belum pernah diajukan pada institusi mana pun, serta

o ikan jiplakan. Saya bertanggung jawab atas keabsahan dan kebenaran isinya

ca sesuai dengan sikap ilmiah yang harus dijunjung tinggi. Demikian

:rnyataan ini saya buat dengan sebenarnya, tanpa ada tekanan dan paksaan

- · pihak mana pun serta bersedia mendapat sanksi akademik jika ternyata

ernudian hari pernyataan ini tidak benar

Page 12: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

Judul:

Nomor: 1359 /ll.3.AU/F/UPI-UK/2020

'

Met , 27 Juli 2020 it,

Nama : DONI PRASETYO NPM : 15510008 Jenis Dokumen : SKRIPSI

SURAT KETERANGAN UJI KESAMAAN (SIMILARITY CHECK)

Unit Publikasi llmiah Universitas Muhammadiyah Metro dengan ini menerangkan bahwa:

PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT) RUAS JALAN SEPUTIH BANYAK-RUMBIA KABUPATEN LAMPUNG TENGAH PROVINS! LAMPUNG

Demikian kami sampaikan untuk digunakan sebagaimana mestinya.

Telah dilakukan validasi berupa Uji Kesamaan (Similarity Check) dengan menggunakan aplikasi Turnitin. Dokumen yang telah diperiksa dinyatakan telah memenuhi syarat bebas uji kesamaan (similarity check} dengan persentase kesamaan � 20%. Hasil pemeriksaan uji kesamaan terlampir.

Page 13: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xiv

DAFTAR ISI

HALAMAN SAMPUL ...................................................................................... i

HALAMAN LOGO ........................................................................................... ii

HALAMAN JUDUL .......................................................................................... iii

ABSTRAK ........................................................................................................ iv

RINGKASAN.................................................................................................... vi

HALAMAN PERSETUJUAN ........................................................................... vii

HALAMAN PENGESAHAN ............................................................................ viii

HALAMAN MOTTO ......................................................................................... ix

HALAMAN PERSEMBAHAN ......................................................................... x

KATA PENGANTAR ....................................................................................... xi

PERNYATAAN TIDAK PLAGIAT ................................................................... xii

SURAT KETERANGAN UJI KESAMAAN (Similarity Check) ..................... xiii

DAFTAR ISI ..................................................................................................... xiv

DAFTAR LAMPIRAN ...................................................................................... xviii

DAFTAR TABEL ............................................................................................. xix

DAFTAR GAMBAR ......................................................................................... xxi

DAFTAR NOTASI ........................................................................................... xxiii

DAFTAR SINGKATAN .................................................................................... xxv

BAB I PENDAHULUAN

A. Latar Belakang Masalah ........................................................................... 1

B. Rumusan Masalah .................................................................................. 2

C. Tujuan Penelitian ..................................................................................... 2

D. Kegunaan Penelitian ................................................................................ 3

E. Ruang Lingkup Penelitian ........................................................................ 3

F. Lokasi Penelitian ....................................................................................... 4

BAB II KAJIAN LITERATUR

A. Kajian Literatur Yang Mendukung Variabel Terkait Dan Bebas ............. 5

1. Definisi Perkerasan Jalan Raya ........................................................ 5

2. Lapisan – Lapisan Struktur Perkerasan Jalan .................................. 5

a. Tanah Dasar (Subgrade) ............................................................ 5

b. Lapis Pondasi Bawah (Sub Base) .............................................. 5

Page 14: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xv

c. Lapis Pondasi Atas (Base) ......................................................... 5

d. Lapis Permukaan (Surface) ........................................................ 6

3. Jenis Perkerasan Jalan ..................................................................... 6

a. Perkerasan Lentur (Flexible Pavement) ..................................... 6

b. Lapisan Perkerasan Kaku (Riged Pavement) ............................ 7

c. Jenis Perkerasan Komposit ........................................................ 7

4. Perkerasan Kaku ............................................................................... 8

a. Lapis Perkerasan Kaku............................................................... 9

b. Jenis Perkerasan Kaku .............................................................. 10

c. Komponen Perkerasan Kaku ...................................................... 12

5. Perencanaan Struktur Perkerasan Kaku Metode Bina Marga 2017 15

a. Tanah Dasar ............................................................................... 15

b. Pondasi Bawah ........................................................................... 15

c. Beton Semen .............................................................................. 18

d. Lalu lintas Rencana untuk Perkerasan Kaku ............................. 18

e. Lajur Rencana dan Koefisien Distribusi (C) ............................... 19

f. Umur Rencana ............................................................................ 19

g. Pertumbuhan Lalu Lintas ............................................................ 20

h. Lalu Lintas Rencana ................................................................... 20

i. Faktor Keamanan Beban ............................................................ 20

j. Perencanaan tulangan................................................................ 21

k. Perkerasan Beton Semen Bersambung Tanpa Tulangan ......... 21

l. Perkerasan Beton Semen Bersambung dengan Tulangan ....... 21

m. Perkerasan Beton Semen Menerus dengan Tulangan .............. 24

n. Sambungan ................................................................................. 25

6. Perencanaan Struktur Perkerasan Kaku Metode AASHTO 1993 .... 27

a. Vehicle Damage Factor (VDF) Desain ....................................... 27

b. Traffic Design .............................................................................. 28

c. Lalu Lintas ................................................................................... 29

d. CBR (California Bearing Ratio)................................................... 30

e. Reliability ..................................................................................... 30

f. Serviceability ............................................................................... 31

g. Modulus Reaksi Tanah Dasar .................................................... 32

h. Modulus Elastilitas Beton dan Flexural Strength ....................... 33

i. Koefesian Drainase .................................................................... 33

Page 15: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xvi

j. Koefisien Transfer Beban (J) ...................................................... 35

k. Penentuan Tebal Pelat Beton (D) Dengan Formuasi ................ 36

l. Penentuan Tebal Pelat Beton(D) dengan Nomogram ............... 37

m. Penulangan ................................................................................. 38

7. Rencana Anggaran Biaya (RAB) ....................................................... 40

a. Pengertian Rencana Anggaran Biaya ........................................ 40

b. Tujuan Rencana Anggaran Biaya .............................................. 40

c. Fungsi Rencana Anggaran Biaya ............................................... 41

d. Komponen Rencana Anggaran Biaya ........................................ 41

B. Penelitian Relevan .................................................................................... 43

C. Kerangka Pemikiran .................................................................................. 45

BAB III METODE PENELITIAN

A. Desain Penelitian ...................................................................................... 47

1. Waktu dan Tempat Penelitian ........................................................... 47

2. Diagram Alir Penelitian ...................................................................... 48

B. Tahapan Penelitian ................................................................................... 49

1. Teknik Sampling ................................................................................ 49

2. Tahapan ............................................................................................. 49

a. Pengambilan sampel tanah ........................................................ 49

b. Pengambilan Sampel Lalu Lintas (LHR) .................................... 50

C. Definisi Oprasional Variabel ..................................................................... 50

1. Variabel Bebas ................................................................................... 50

2. Variabel Terkait .................................................................................. 51

D. Teknik Pengumpulan Data ....................................................................... 51

1. Data Primer ........................................................................................ 51

2. Data Sekunder ................................................................................... 51

E. Instrumen Penelitian ................................................................................. 51

1. Pengujian Sampel Tanah .................................................................. 51

a. Pengujian Berat Jenis ................................................................. 52

b. Pengujian Kadar Air .................................................................... 52

c. Pengujian Pemadatan Tanah (proctor) ...................................... 54

d. Pengujian CBR Soeked Swelling test ........................................ 55

2. Survey Lalu Lintas (LHR) ................................................................... 58

a. Persiapan .................................................................................... 58

Page 16: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xvii

b. Peralatan Yang Digunakan ......................................................... 58

c. Penentuan Waktu Penelitian ...................................................... 58

d. Metode Inventaris Data............................................................... 59

e. Teknik Survey ............................................................................. 59

F. Teknik Analisa Data .................................................................................. 60

BAB IV HASIL PENELITIAN DAN PEMBAHASAN

A. Gambaran Umum ..................................................................................... 61

B. Hasil Penelitian ......................................................................................... 61

1. Deskripsi Data .................................................................................... 61

a. Data Pengujian Tanah Dasar ..................................................... 61

b. Data Lalu Lintas Harian Rata – rata (LHR) ................................ 64

2. Analisis Data ...................................................................................... 68

a. Perhitungan Perkerasan Kaku Metode Bina Marga 2017 ......... 68

b. Perhitungan Perkerasan Kaku Metode AASHTO 1993 ............. 81

c. Rencana Anggaran Biaya (RAB) ................................................ 95

C. Pembahasan ............................................................................................. 98

BAB V PENUTUP

A. Simpulan ................................................................................................... 102

B. Saran ......................................................................................................... 103

DAFTAR LITERATUR

LAMPIRAN

Page 17: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xviii

DAFTAR LAMPIRAN

Lampiran Halaman

1. Data Pengujian Kadar Air ......................................................................... 106

2. Data Pengujian Berat Jenis Tanah Asli .................................................... 111

3. Data Pengujian CBR ................................................................................. 115

4. Data Pengujian Pemadatan Tanah (Proctor Test) ................................... 131

5. Data Pertumbuhan Lalu Lintas Tahun 2011-2017 ................................... 135

6. Data Survey Volume Lalu Lintas Tahun 2020 .......................................... 137

7. Data Hari Hujan Tahun 2010-2017........................................................... 145

8. Data Perhitungan Vehicle Damage Factor (VDF) .................................... 147

9. Rencana Anggaran Biaya (RAB) Metode Bina Marga 2017 .................... 149

10. Rencana Anggaran Biaya (RAB) Metode AASHTO 1993 ....................... 154

11. Harga Satuan Pekerjaan .......................................................................... 159

12. Harga Satuan Alat ..................................................................................... 163

13. Analisa Harga Satuan Pekerjaan ............................................................. 166

14. Gambar Rencana Metode Bina Marga 2017 ........................................... 184

15. Gambar Rencana Metode AAHTHO 1993 ............................................... 196

16. Formulir Pengajuan Judul ......................................................................... 208

17. Surat Keputusan Pembimbing .................................................................. 210

18. Surat Izin Penelitian .................................................................................. 212

19. Surat Balasan Izin Penelitian .................................................................... 214

20. Foto Dokumentasi ..................................................................................... 216

21. Transkip Nilai ............................................................................................ 237

22. Kartu Bimbingan ....................................................................................... 239

23. Riwayat Hidup ........................................................................................... 241

Page 18: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xix

DAFTAR TABEL

Tabel Halaman

1. Perbedaan Antara Perkerasan dan Perkerasan Lentur .............................. 8

2. Lebar Lajur dan bahu Jalan ......................................................................... 8

3. Alasan Digunakan dan Tidak Digunakannya Subbase ............................... 9

4. Jumlah Lajur Berdasarkan Lebar Perkerasan ............................................. 19

5. Faktor Keamanan Beban (FKB) .................................................................. 21

6. Ukuran dan Berat Tulangan Polos Anyaman Las ....................................... 22

7. Luas Penampang Tulangan Baja Per Meter Panjang Plat ......................... 23

8. Diameter Ruji (Dowel) .................................................................................. 27

9. Vehicle Damage Factor (VDF) Desain ........................................................ 28

10. Faktor Distribusi Lajur (DL) .......................................................................... 29

11. Reliability (R) disarankan ............................................................................. 31

12. Penetapan Standard Normal deviation (ZR) ............................................... 31

13. Terminal Serviceability index (Pt) ................................................................ 32

14. Loss of Support Factors (LS) ....................................................................... 32

15. Mutu Drainase .............................................................................................. 34

16. koefesian pengaliran C ................................................................................ 35

17. Drainage coefficient (Cd) .............................................................................. 35

18. Koefisien transfer beban (J)......................................................................... 36

19. Penentuan Ukuran Tie Bar .......................................................................... 38

20. Ketentuan dimensi dan Jarak pemasangan Dowel ..................................... 39

21. Satuan .......................................................................................................... 41

22. Pengujian Kadar Air ..................................................................................... 61

23. Pengujian Berat Jenis Tanah Asli ................................................................ 62

24. Pengujian CBR............................................................................................. 62

25. Hasil Pengujian CBR ................................................................................... 62

26. Pengujian Percobaan Pemadatan (Proctor Test) ....................................... 63

27. Pertumbuhan Jumlah Kendaraan Tahun 2011 – 2017 ............................... 64

28. Data Lalu Lintas Harian Rata - Rata Tahun 2020 ....................................... 65

29. Data Volume Lalu Lintas Yang Ditinjau ....................................................... 66

30. Pada Hari Senin, 23 maret 2020 ................................................................. 66

31. Jumlah Hari Hujan Tahun 2010 – 2017 ....................................................... 67

32. Perhitungan Jumlah Sumbu Berdasarkan Jenis dan Bebannya ................ 68

Page 19: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xx

33. Jumlah lajur berdasarkan lebar perkerasan dan koefisien ......................... 69

34. Perhitungan repetisi sumbu rencana ........................................................... 70

35. Faktor Keamanan Beban ............................................................................. 70

36. Analisa Fatik dan Erosi (Tebal = 22 cm) ..................................................... 73

37. Tegangan Ekivalen dan Faktor Erosi Perkerasan Tanpa Bahu Beton ........ 74

38. Ukuran dan jarak batang dowel (ruji) yang disarankan ............................... 77

38. Data Lalu Lintas Berdasarkan Jenis Kendaraan ......................................... 81

40. Vehicle Damage Factor (VDF) Golongan Kendaraan ................................. 82

41. Faktor Distribusi Lajur (DL)........................................................................... 82

42. Perhitungan ESAL ....................................................................................... 83

43. Reliability (R) disarankan ............................................................................. 83

44. Standard Normal deviation (ZR) ................................................................... 84

45. Terminal Serviceability index (Pt) ................................................................ 84

46. Loss of Support Factors (LS) ....................................................................... 85

47. Jumlah Hari Hujan Per Tahun ..................................................................... 87

48. koefesian pengaliran C ................................................................................ 87

49. Drainage coefficient (Cd) .............................................................................. 88

50. Load Transfer Coeffecient (J) ...................................................................... 89

51. Penentuan Ukuran Tie Bars ........................................................................ 91

52. Ketentuan dimensi dan Jarak pemasangan Dowel ..................................... 92

53. Perhitungan Volume Pekerjaan ................................................................... 95

54. Analisa Harga Satuan Pekerjaan ................................................................ 95

55. Analisa Biaya Kontruksi Pekerjaan.............................................................. 96

56. Perhitungan Volume Pekerjaan ................................................................... 97

57. Analisa Harga Satuan Pekerjaan ................................................................ 97

58. Analisa Biaya Kontruksi Pekerjaan.............................................................. 98

59. Perbandingan tebal beton dan anggaran biaya masing-masing metode ... 99

60. Perbandingan parameten input masing-masing metode ............................ 99

Page 20: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xxi

DAFTAR GAMBAR

Gambar Halaman

1. Struktur Lapis Perkerasan Lentur ................................................................ 6

2. Struktur Lapis Perkerasan Kaku .................................................................. 7

3. Struktur Lapis Perkerasan Komposit ........................................................... 7

4. Perkerasan Beton Bersambung Tanpa Tulangan (BBTT) .......................... 10

5. Perkerasan Beton Bersambung Dengan Tulangan (BBDT) ....................... 11

6. Perkerasan Beton Menerus Dengan Tulangan (BMDT) ............................. 11

7. Perkerasan Beton Prategang (PCP) ........................................................... 12

8. Ilustrasi Penyaluran Beban .......................................................................... 12

9. Ruji pada Sambungan Melintang ................................................................ 13

10. Batang Pengikat pada Sambungan Memanjang......................................... 13

11. Sambungan Memanjang dengan Pengunci ................................................ 13

12. Tebal Minimum Pondasi Bawah .................................................................. 16

13. CBR Tanah Dasar Efektif ............................................................................ 17

14. Diagram untuk menentukan Modulus reaksi subgrade (k) ......................... 33

15. Penentuan Tebal Pelat dengan Nomogram ................................................ 37

16. Sambungan Tie Bar ..................................................................................... 39

17. Sambungan Melintang Dowel ...................................................................... 40

18. Skema Kerangka Pemikiran ........................................................................ 46

19. Peta Lokasi Penelitian ................................................................................. 47

20. Site Plan Lokasi Penelitian .......................................................................... 47

21. Bagan Alir Penelitian (flow chart) ................................................................ 48

22. Grafik CBR ................................................................................................... 63

23. Grafik Rekapitulasi Arus Lalu lintas ............................................................. 67

24. CBR tanah dasar efektif dan tebal pondasi bawah ..................................... 71

25. Grafik Perencanaan ..................................................................................... 72

26. Analisis fatik dan beban repetisi ijin berdasarkan rasio tegangan,

dengan /tanpa bahu beton ................................................................... 75

27. Analisa erosi dan jumlah repetisi beban ijin, berdasarkan faktor erosi,

tanpa bahu beton ................................................................................. 76

28. Denah Lokasi Penelitian ...................................................................... 79

29. Potongan Melintang Jalan .................................................................... 79

30. Potongan A – A .................................................................................... 79

Page 21: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xxii

31. Denah Potongan Rigid Pavement Persegmen .................................... 79

32. Detail Pembesian Rigid Pavement Per Segmen .................................. 80

33. Detail Potongan A – A Batang Pengikat (Tie Bars) .............................. 80

34. Detail Potongan B – B Ruji (Dowel Bars) ............................................. 80

35. Diagram untuk menentukan Modulus reaksi subgrade (k) ......................... 86

36. Nomogram Perkerasan Kaku ...................................................................... 90

37. Denah Lokasi Penelitian ...................................................................... 93

38. Potongan Melintang Jalan .................................................................... 93

39. Potongan A – A .................................................................................... 93

40. Denah Potongan Rigid Pavement Persegmen .................................... 93

41. Detail Pembesian Rigid Pavement Per Segmen .................................. 94

42. Detail Potongan A – A Batang Pengikat (Tie Bars) .............................. 94

43. Detail Potongan B – B Ruji (Dowel Bars) ............................................. 94

Page 22: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xxiii

DAFTAR NOTASI

μ = Koefisien gesek antara pelat beton dan pondasi bawah.

φ = Diameter batang pengikat.

εs = Koefisien susut beton.

b = Jarak terkecil antar sambungan atau jarak sambungan dengan tepi

perkerasan

C = Koefisien distribusi lajur kendaraan

Cd = Drainage coefficient

Cs = Koefisien yang menyatakan kondisi pelat lama

D = Tebal perkerasan

Ec = Modulus elastisitas beton

Es = Modulus elastisitas baja

fc’ = Kuat tekan beton karakteristik 28 hari.

Fcf = Kuat tarik lentur beton 28 hari

fcs = Kuat tarik tidak langsung beton 28 hari

Fct = Kuat tarik langsung beton

FE = Faktor Erosi

Fk = Faktor konversi lapisan perkerasan lama (yang ada).

FKB = Faktor keamanan beban.

FRT = Faktor Rasio Tegangan.

g = Gravitasi

h = Tebal pelat beton

i = Laju pertumbuhan lalu-lintas per tahun

J = Load Transfer Coeffecient

K = Konstanta, koefisien antara kuat tekan dan kuat tarik lentur beton

L = Jarak antara sambungan yang tidak diikat dan/atau tepi bebas pelat

l = Panjang batang pengikat.

Lp = Lebar perkerasan

Lcr = Jarak teoritis antara retakan

M = Berat pelat beton per satuan volume

n = Angka ekivalensi antara baja dan beton.

nl = Jumlah lajur

Ps = Persentase luas tulangan memanjang yang dibutuhkan terhadap luas

penampang beton

Page 23: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xxiv

Pt = Terminal Serviceability index

R = Faktor pertumbuhan kumulatif yang besarnya tergantung dari

pertumbuhan lalu lintas tahunan dan umur rencana

Tr = Tebal lapis tambahan berdasarkan beban rencana dan daya dukung

tanah dasar dan atau lapis pondasi bawah dari jalan lama

T0 = Tebal pelat yang ada

Te = Tebal efektif perkerasan lama

TE = Tegangan Ekivalen

T = Tebal perlu berdasarkan beban rencana dan atau daya dukung tanah

dasar dan atau lapis pondasi bawah dari jalan lama

ZR = Standard Normal deviation

Page 24: PERENCANAAN STRUKTUR PERKERASAN KAKU (RIGID PAVEMENT RUAS JALAN … · 2021. 1. 7. · perencanaan struktur perkerasan kaku (rigid pavement) ruas jalan seputih banyak – rumbia kabupaten

xxv

DAFTAR SINGKATAN

AASHTO = American Association of State Highway and Transportation

Officials

BBDT = Beton Bersambung Dengan Tulangan

BBTT = Beton Bersambung Tanpa Tulangan

BJTP = Baja Tulangan Polos

BJTU = Baja Tulangan Ulir

BMDT = Beton Menerus Dengan Tulangan

BP = Bahan Pengikat

CBK = Campuran Beton Kurus

CBR = California Bearing Ratio

ESAL = Equivalent Single Axle Load

FE = Faktor Erosi

FRT = Faktor Rasio Tegangan

JSKN = Jumlah Sumbu Kendaraan Niaga

JSKNH = Jumlah Sumbu Kendaraan Niaga Harian

LHR = Lalu Lintas Harian Rata – Rata

RAB = Rencana Anggaran Biaya

SNI = Standar Nasional Indonesia

STdRG = Sumbu Tandem Roda Ganda

STRG = Sumbu Tunggal Roda Ganda

STrRG = Sumbu Tridem Roda Ganda

STRT = Sumbu Tungga Roda Tunggal

TE = Tegangan Ekivalen

TT = Tak terbatas

UR = Umur Rencana

URm = Waktu tertentu dalam tahun sebelum umur rencana

VDF = Vehicle Damage Factor