PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

16
PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN PENGEDOKAN BARGE 300 FEET DI INDONESIA TIMUR (SIDANGOLI GAM) SKRIPSI ALIEFAH ALENASARI SHILMA 1710313010 UNIVERSITAS PEMBANGUNAN NASIONAL VETERAN JAKARTA FAKULTAS TEKNIK PROGRAM STUDI S1 TEKNIK PERKAPALAN 2021

Transcript of PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

Page 1: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

PERENCANAAN GALANGAN UNTUK PEMBANGUNAN

DAN PENGEDOKAN BARGE 300 FEET DI INDONESIA

TIMUR (SIDANGOLI GAM)

SKRIPSI

ALIEFAH ALENASARI SHILMA

1710313010

UNIVERSITAS PEMBANGUNAN NASIONAL VETERAN JAKARTA

FAKULTAS TEKNIK

PROGRAM STUDI S1 TEKNIK PERKAPALAN

2021

Page 2: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

i

PERENCANAAN GALANGAN UNTUK PEMBANGUNAN

DAN PENGEDOKAN BARGE 300 FEET DI INDONESIA

TIMUR (SIDANGOLI GAM)

SKRIPSI

Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar

Sarjana Teknik

ALIEFAH ALENASARI SHILMA

1710313010

HALAMAN JUDUL

UNIVERSITAS PEMBANGUNAN NASIONAL VETERAN JAKARTA

FAKULTAS TEKNIK

PROGRAM STUDI S1 TEKNIK PERKAPALAN

2021

Page 3: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …
Page 4: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …
Page 5: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …
Page 6: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …
Page 7: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

vi

PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN

PENGEDOKAN BARGE 300 FEET DI INDONESIA TIMUR

(SIDANGOLI GAM)

Aliefah Alenasari Shilma

ABSTRAK

Indonesia bagian timur khususnya Maluku Utara merupakan kawasan

pertambangan nikel terbesar di Indonesia sehingga, permintaan akan transportasi

untuk pengangkutan hasil tambangnya yaitu barge akan mengalami peningkatan

yang cukup pesat. Industri galangan pada daerah tersebut hingga saat ini belum

terealisasikan yang artinya barge produksi serta reparasinya masih dilakukan di

pulau Jawa. Pembangunan galangan baru pada daerah tersebut merupakan suatu

inovasi yang bertujuan untuk meningkatkan produktivitas pengangkutan hasil

tambangnya. Akan tetapi, investasi lahan merupakan suatu hal yang selalu

dipertimbangkan pada tahap awal suatu perencanaan. Oleh sebab itu pemilihan

lahan yang jauh dari pemukiman seperti pada desa Sidangoli Gam, Kecamatan

Jailolo Selatan, Kabupaten Halmahera Barat, Maluku Utara merupakan pilihan

yang tepat. Perencanaan galangan ini hanya diperuntukan untuk barge dengan

panjang 300 feet dan kapal tundanya. Morowali, Sulawesi Tengah terdapat PT.

Indonesia Guang Ching Nickel and Stainless Steel Industry, PT. Tsingshan Steel

Indonesia dan beberapa lainnya yang dapat menjadi pemasok untuk material baja

yang diperlukan pada reparasi atau bangunan baru. Pada daerah dengan perairan

dangkal airbag sistem lebih cocok sebagai media docking ataupun peluncurannya

dan juga tidak tergantung dari pasang surut perairan sehingga dapat dilakukan kapan

saja. Perencanaan galangan ini untuk memberikan kemudahan pelayanan jasa

pembangunan dan perawatan barge di lokasi pertambangan serta untuk menarik

investor agar dapat melakukan pengembangan galangan pada daerah tersebut.

Kata kunci: Barge, Galangan, Layout, Airbag.

Page 8: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

vii

GALLERY PLANNING FOR THE DEVELOPMENT AND

SUPPLY OF A 300 FEET BARGE IN EAST INDONESIA

(SIDANGOLI GAM)

Aliefah Alenasari Shilma

ABSTRACT

Eastern Indonesia, especially North Maluku, is the largest nickel mining area in

Indonesia, so the demand transportation for the transportation of its mines, namely

barges, will increase quite rapidly. Until now, the shipyard industry in this area has

not been realized, which means that barge production and repair are still being

carried out on the island of Java. The construction of a new shipyard in the area is

an innovation aimed at increasing the productivity of the transportation of its mining

products. However, investing in land is something that is always considered at an

early stage of planning. Therefore, choosing land that is far from residential areas

such as in the village of Sidangoli Gam, South Jailolo District, West Halmahera

Regency, North Maluku is the right choice. This shipyard plan is only intended for

the 300 feet long barge and tugboats. Morowali, Central Sulawesi where there is

PT. Nickel and Stainless Steel Industry Guang Ching Indonesia, PT. Tsingshan

Steel Indonesia and several others who can become suppliers for steel materials

required for repair or new buildings. In areas with shallow waters the air bag system

is more suitable as a media docking or independent from the tides so that it can be

done at any time. This shipyard planning is to provide construction and maintenance

services for barges at mining sites and to attract investors to be able to develop

shipyards in the area.

Keyword: Barge, Shipyard, Layout, Airbag.

Page 9: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

viii

KATA PENGANTAR

Assalamualaikum Warohmatuwlohi Wabarokatu

Puji syukur khadirat Tuhan Yang Maha Esa yang telah memberikan kesehatan baik

jasmani dan rohani sehingga penulis dapat menyelesaikan skripsi yang berjudul

“Perencanaan Galangan Pembangunan dan Pengedokan Barge 300 feet di Indonesia

Timur (Sidangoli Gam)”. Penulisan skripsi ini dimaksudkan untuk memenuhi syarat

kelulusan sarjana Teknik Perkapalan Universitas Pembangunan Nasional Veteran

Jakarta. Penulis menyampaikan terimakasih kepada pihak yang membantu dalam

penyelesaian proposal ini yaitu:

1. Bapak Dr. Ir Reda Rizal, M.Si, B. Sc. selaku Dekan Fakultas Teknik

Universitas Pembangunan Nasional Veteran Jakarta.

2. Ibu Dr.Wiwin Sulistiyawati, ST, M.T. selaku Kepala Program Studi Teknik

Perkapalan Fakultas Teknik Universitas Pembangunan Nasional Veteran

Jakarta

3. Kepada dosen pembimbing 1 bapak Ir. Amir Marasabessy, M.T, IPM. dan

dosen pembimbing 2 bapak Drs. Bambang Sudjasta, ST, M.T. Yang telah

mengajarkan dan membimbing, sehingga saya dapat menentukan arah

penelitian saya.

4. Ibu Perili Yashinta selaku ibunda tercinta yang telah memberikan dukungan

lahir dan batin kepada penulis

5. Bapak Jefri Latupeirissa selaku ayahanda yang telah memberikan semangat

dan motivasi selama pengerjaan skripsi ini.

6. Kepada Fejri Raihan Albi Latupeirissa selaku abang tercinta yang selalu

memberikan dukungan dan motivasi kepada penulis.

7. Kepada Chantika Permata Sari dan Andieni Rahmawati selaku teman

tercinta yang selalu memberikan dukungan serta pertolongan selama penulis

mengerjakan skripsi ini.

8. Kepada Mba Nita Aviyanti selaku senior MARITIM 2015 yang telah

memberikan banyak bantuan kepada penulis, sehingga skripsi ini dapat

diselesaikan dengan baik.

Page 10: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

ix

9. Kepada Mba Firdania Amelia Riyanto selaku senior MARITIM 2016 yang

telah memberikan ilmu serta membantu selama penulisan skripsi ini.

10. Teman-teman teknik perkapalan 2017 yang telah memberikan dan

membagikan ilmu yang di milikinya serta membantu dalam penulisan

skripsi ini.

11. Kepada senior-senior MARITIM yang telah membantu penulis hingga

skripsi ini dapat diselesaikan dengan baik.

12. Dan kepada seluruh pihak yang tidak dapat saya sebutkan satu persatu.

Penulis berharap penulisan skripsi ini dapat menjadi rujukan atau pembelajaran

untuk dikembangkan dikemudian hari. Penulis menyadari tidak ada sesuatu yang

sempurna, oleh sebab itu kritik dan saran sangat diperlukan untuk menjadi

pembelajaran kedepannya.

Wassalamualaikum Warohmatuwlohi Wabarokatu.

Jakarta, 08 Februari 2020

Penulis

Page 11: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

x

DAFTAR ISI

DAFTAR ISI

HALAMAN JUDUL .............................................................................................. i

PENGESAHAN ..................................................................................................... ii

PENGESAHAN PEMBIMBING ........................................................................ iii

PERNYATAAN ORISINALITAS ...................................................................... iv

PERNYATAAN PERSETUJUAN PUBLIKASI ................................................. v

ABSTRAK ............................................................................................................ vi

ABSTRACT ......................................................................................................... vii

KATA PENGANTAR ........................................................................................ viii

DAFTAR ISI ........................................................................................................... x

DAFTAR GAMBAR ........................................................................................... xii

DAFTAR TABEL .............................................................................................. xiv

BAB 1 PENDAHULUAN ...................................................................................... 1

1.1. Latar Belakang ..................................................................................................... 1

1.2. Perumusan Masalah............................................................................................ 2

1.3. Batasan Masalah ................................................................................................. 2

1.4. Tujuan Penelitian ................................................................................................ 3

1.5. Manfaat Penelitian .............................................................................................. 3

1.6. Sistematika Penulisan ......................................................................................... 3

BAB 2 TINJAUAN PUSTAKA ............................................................................. 4

2.1. Galangan Kapal ................................................................................................... 4

2.2. Barge ................................................................................................................... 4

2.3. Building Berth...................................................................................................... 7

2.4. Airbag Docking System ........................................................................................ 7

2.5. Jetty ..................................................................................................................... 9

2.6. Fasilitas Galangan.............................................................................................. 10

2.7. Layout Galangan ............................................................................................... 12

BAB 3 METODE PENELITIAN ........................................................................ 15

3.1. Diagram Alir Penelitian ..................................................................................... 15

3.2. Lokasi Penelitian ............................................................................................... 17

3.3. Metode Perencanaan Layout ............................................................................ 18

BAB 4 PEMBAHASAN ....................................................................................... 20

4.1. Analisi Potensi Wilayah ..................................................................................... 20

Page 12: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

xi

4.2. Analisi Layout Galangan .................................................................................... 20

4.3. Analisis Fasilitas Galangan ................................................................................ 29

BAB 5 KESIMPULAN ........................................................................................ 45

5.1. Kesimpulan ........................................................................................................ 45

5.2. Saran ................................................................................................................. 46

DAFTAR PUSTAKA

RIWAYAT HIDUP

LAMPIRAN

Page 13: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

xii

DAFTAR GAMBAR

Gambar 2. 1 Liquid Cargo Barge ............................................................................. 5

Gambar 2. 2 Tongkang Batu bara ............................................................................ 6

Gambar 2. 3 Tongkang Peti Kemas ......................................................................... 6

Gambar 2. 4 Airbag Docking System ...................................................................... 8

Gambar 2. 5 Bagian Komponen Airbag ................................................................... 8

Gambar 2. 6 Tipe peletakkan airbag ........................................................................ 9

Gambar 2. 7 Jetty Semipermanen .......................................................................... 10

Gambar 2. 8 Mould loft .......................................................................................... 12

Gambar 2. 9 Contoh Layout Galangan Kapal ....................................................... 14

Gambar 4. 1 Layout Gudang Penimbunan Plat ...................................................... 22

Gambar 4. 2 Layout Gudang Penimbunan pipa, pompa dan generator ................. 22

Gambar 4. 3 Lintasan Forklift A dan B.................................................................. 23

Gambar 4. 4 Lintasan Forklift C ............................................................................ 23

Gambar 4. 5 Layout Ruang Kantor Gudang Penimbunan ..................................... 24

Gambar 4. 6 Layout Bengkel Konstruksi ............................................................... 25

Gambar 4. 7 Layout Area Blok .............................................................................. 25

Gambar 4. 8 Layout Ruang kantor bengkel konstruksi.......................................... 26

Gambar 4. 9 Panjang Permukaan sentuh antara airbag dengan alas kapal ............ 27

Gambar 4. 10 Layout Ruang Enginering ............................................................... 30

Gambar 4. 11 Layout Ruang Arsip, IT, TU dan Personalia ................................... 31

Gambar 4. 12 Layout Ruang General Manager dan Rapat Utama ........................ 32

Gambar 4. 13 Layout Ruang Pimpro ..................................................................... 33

Gambar 4. 14 Layout Ruang K3 ............................................................................ 34

Gambar 4. 15 Layout Ruang QC............................................................................ 34

Gambar 4. 16 Layout Ruang OS dan Class............................................................ 35

Gambar 4. 17 Layout Bengkel SARFAS ............................................................... 35

Gambar 4. 18 Layout Kantor SARFAS ................................................................. 36

Gambar 4. 19 Gergaji Belah................................................................................... 36

Gambar 4. 20 Gergaji Potong ................................................................................ 37

Page 14: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

xiii

Gambar 4. 21 wood planer ..................................................................................... 37

Gambar 4. 22 Layout Bengkel Pipa dan Outfitting................................................ 38

Gambar 4. 23 Layout Ruang Kantor Pipa .............................................................. 39

Gambar 4. 24 Layout Ruang Kantor Outfitting ..................................................... 39

Gambar 4. 25 Layout Bengkel Listrik.................................................................... 40

Gambar 4. 26 Layout Kantor Bengkel Listrik ....................................................... 40

Gambar 4. 27 Mesin Bubut Kecil .......................................................................... 41

Gambar 4. 28 Mesin Drill ...................................................................................... 42

Gambar 4. 29 mesin frais ....................................................................................... 42

Gambar 4. 30 Mesin Sekrap ................................................................................... 43

Gambar 4. 31 Layout Bengkel Mesin .................................................................... 43

Gambar 4. 32 Layout Ruang Kantor Bagian Mesin ............................................... 44

Page 15: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

xiv

DAFTAR TABEL

Tabel 4. 1 Kebutuhan plat dan profil SPOB BOJONEGORO – VII CAP 500 T .. 21

Tabel 4. 2 Ukuran Utama Barge ............................................................................ 27

Tabel 4. 3 Nilai Penentuan R ................................................................................. 27

Tabel 4. 4 Nilai Penentuan Ld................................................................................ 28

Tabel 4. 5 Spesifikasi Gergaji Belah ...................................................................... 37

Tabel 4. 6 Spesifikasi Mesin Serut ......................................................................... 38

Tabel 4. 7 Spesifikasi Mesin Bubut ....................................................................... 41

Tabel 4. 8 Spesifikasi mesin drill ........................................................................... 42

Page 16: PERENCANAAN GALANGAN UNTUK PEMBANGUNAN DAN …

xv

DAFTAR LAMPIRAN

Lampiran 1. Kontur Tanah

Lampiran 2. Layout Galangan

Lampiran 3. Layout Galangan dengan detail

Lampiran 4. Docking Plan