Oleh Perenia Carbon - Kadin Indonesia - CDM for EBT(Parenia... · EBT dan CDM di Indonesia Oleh...

21
July 2011 EBT dan CDM di Indonesia Oleh Perenia Carbon

Transcript of Oleh Perenia Carbon - Kadin Indonesia - CDM for EBT(Parenia... · EBT dan CDM di Indonesia Oleh...

July 2011

EBT dan CDM di IndonesiaOleh

Perenia Carbon

Latar Belakang Perenia

Overview

Perenia didirikan tahun 2008 sebagai joint venture antara SMEC dan Pacific Hydro, menggabungkan pengalamannya sejak tahun 2000.

Pada tahun 2009, Mitsui & Co, Ltd of Japan menjadi shareholder ketiga, yang merupakan pemain di carbon markets sejak 2003.

Di Australia Perenia bermarkas di Sydney dengan kantor cabang di Melbourne, Brisbane, Perth.

Perenia memiliki cakupan global dengan proyek dan kantor tersebar di Brazil, Chile, India, Pakistan, China, Vietnam, Thailand, Malaysia, Indonesia, PNG dan negara-negara lainnya berkat keberadaan para shareholder.

Perenia menawarkan jasa complete carbon solutions untuk memanage resiko karbon, identifikasi peluang karbon, dan merealisasikan peluang tersebut bersama klien kami.

11

2

Mitsui & Co., Ltd. is one of Japan's leading investment and trading housesMitsui is a global conglomerate with approximately 40,000 employees operating in over 67 countries around the worldMitsui & Co., Ltd provides Perenia with experience in the registration of Clean Development Mechanism projects as well as extensive capabilities in brokerage of carbon credits and financing

Pacific Hydro is Australia’s leading premier renewable energy company and one of the largest independent, specialist renewable energy businesses in the world

Pacific Hydro provides Perenia with experience in the development and operation of large scale energy projects

SMEC, or Snowy Mountains Engineering Corporation, is one of the world’s leading engineering and development consultancies With 4,000 employees and operations throughout Australia, Asia, Middle East and Africa

SMEC offers services to support Perenia with consulting services for the design and implementation of emission reduction projects through specialist expertise encompassing the power, water, civil infrastructure and environmental sectors

Shareholders

Cakupan Pasar Perenia3

4

Perenia provides expertise across the entire project cycle

Layanan

Carbon Management

Services

Sustainable Energy

Solutions

CDM/JI/VER Registration

Transaction Services

Project Development &

Delivery

Equipment / Technology Assessment & Supply

Complete

Carbon

Solutions

Daftar Proyek CDM Perenia - 15

Project Client Services Location Project Status

CDM Registration, Commercialisation and Off-take Agreement Projects

CDM Services for the 55MW Lihir Geothermal Power Project

Lihir Gold Limited Registration and Commercialisation

Papua New Guinea

Registered

CDM Services for 155MW La Higuera Hydroelectric Power Project

Hidroeléctrica La Higuera S.A

Registration and Commercialisation

Chile Registered

CDM Services for the Vaturu and Wainikasou Hydroelectric Power Projects

Sustainable Energy Limited

Registration and Commercialisation

Fiji Registered

CDM Services for the 4.8MW Birahi GangaHydroelectric Power Project

Birahi Ganga Hydro Power Ltd

Registration and Commercialisation

India Registered

CDM Services for 96MW Jorethang Loop Hydroelectric Power Project

DANS Energy Pvt. Ltd Registration India Registered

CDM Services for the 70MW Budhil Hydroelectric Power Project

Lanco Green Power Pvt. Ltd

Registration India Registered

CDM Services for large scale biogas project in Bidor, Perak

Cahaya Muda Palm Oil Mill S.B.

Registration Malaysia Registered

CDM Services for large scale biogas project in Sitiawan, Perak

Sungai Kerang Palm Oil Mill S.B.

Registration Malaysia Registered

CDM Services for large scale biogas projects in Kota Tinggi, Johor

Kim Loong Power S.B. Registration Malaysia Registered

CDM Services for the large scale biogas project in Keningau, Sabah

Kim Loong Sook S.B. Registration Malaysia Registered

Daftar Proyek CDM Perenia - 26

Project Client Services Location Project Status

CDM Registration, Commercialisation and Off-take Agreement Projects

CDM Services for the 4.5MW Manglad Small Hydroelectric Power Project

Shree Bhavani Power Projects

Registration and Commercialisation

India Registered

CDM Services for the 100MW Himachel Sorang Hydroelectric Power Project

Himachal Sorang Power Project

Registration and Commercialisation

India Registered

CDM Services for the SK Power Wastewater Project EDF Trading Registration Thailand Registered

CDM services for small scale biogas project in Tawau, Sabah

KDC Mill 1 and 2 Biogas Project

Registration Malaysia Registered

CDM Services for the 155MW La Confluencia Hydroelectric Power Project

Tinguiririca EnergiaRegistration and Commercialisation

Chile Registered

CDM Services for the JR One Wastewater Project EDF Trading Registration ThailandRequesting

Registration

CDM Services for the 13.2MW Rishi Ganga Hydroelectric Power Project

Rishi Ganga Power Corporation

Registration and Commercialisation

India Under validation

CDM Services for the 27MW Nam La Hydroelectric Power Project

EDF Trading Registration Vietnam Under validation

CDM Services for the Papop Biogas and Renewable Energy Project

EDF Trading Registration Thailand Under validation

Daftar Proyek CDM Perenia - 37

Project Client Services Location Project Status

CDM Registration, Commercialisation and Off-take Agreement Projects

CDM Services for the 111MW Chacayes Hydroelectric Power Project

Pacific Hydro Chile Registration and Commercialisation

Chile Under validation

CDM Services for Iron and Steel Works Waste Gas Power Generation Project

Confidential Client Registration China Under validation

CDM Services for Waste heat recovery captive power

project at a sponge iron and Steel power plant in

Madhya Pradesh

Confidential Client Registration India Under validation

CDM Services for 21MW bundled wind power project

in Tamil Nadu

Confidential Client Registration India Under validation

CDM Services for 23.75MW wind power project in

Tamil Nadu

Confidential Client Registration India Under validation

CDM Services for 16.25MW wind power project in

Tamil Nadu

Confidential Client Registration India Under validation

CDM Services for 99MW Ting Ting Hydroelectric Project

TT Energy Pvt. Ltd.Registration and

CommercialisationIndia

PDD in

Preparation

CDM Services for 96MW NAFRA Hydroelectric projectSEW Nafra Power Corporation Ltd

Registration and

CommercialisationIndia

PDD in

Preparation

Daftar Proyek CDM Perenia - 48

Project Client Services Location Project Status

CDM Registration, Commercialisation and Off-take Agreement Projects

CDM Services for the 96MW Rogni Chu Hydroelectric Power Project

Madhya Bharat Power Corporation Limited

Registration and

CommercialisationIndia At validation

CDM Services for the 41MW Chu Linh – Coc San Hydroelectric Power Project

Colben EnergyRegistration and

CommercialisationVietnam

PDD in

Preparation

CDM Services for 11.5MW Waste Heat Recovery Project

Hoang Thach CementRegistration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 34MW Hydroelectric Power Project Sapa Hydro JSCRegistration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 8MW Hydroelectric Power Project Anpha Inv Hydro JSCRegistration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 10MW Hydroelectric Power Project Nam Mo Hydro JSCRegistration and Off-take Agreement

Vietnam At validation

CDM Services for 100MW Hydroelectric Power Project Confidential Client Registration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 64MW Hydroelectric Power Project Buon Don Hydro JSCRegistration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 96MW Tashiding Hydroelectric Project

Shiga Energy Pvt. Ltd.Registration and

CommercialisationIndia

PDD in

Preparation

CDM Services for 21MW Kamlang Hydroelectric Project

Sai KrishnodayaIndustries Ltd

Registration and

CommercialisationIndia

PDD in Preparation

Daftar Proyek CDM Perenia - 59

Project Client Services Location Project Status

CDM Registration, Commercialisation and Off-take Agreement Projects

CDM Services for multiple hydropower projectsPakistan Water and Power Development Authority

Registration and

CommercialisationPakistan

PDD in

Preparation

CDM Services for 24MW Hydroelectric Power ProjectESACO Nam Luc Hydro

JSC

Registration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for 100MW Hydroelectric Power Project Confidential ClientRegistration and Off-take Agreement

VietnamPDD in Preparation

CDM Services for the Umas Palm Oil Mill Biogas Project FELDA Registration MalaysiaPDD in Preparation

CDM Services for the Sungai Tengi Palm Oil Mill Biogas Project

FELDA Registration MalaysiaPDD in Preparation

CDM Services for the Tengarog Palm Oil Mill Biogas Project

FELDA Registration MalaysiaPDD in Preparation

CDM Services for the Keratong 9 Palm Oil Mill Biogas Project

FELDA Registration MalaysiaPDD in Preparation

CDM Services for the 9MW True Energy Biomass Project

EDF Trading Registration ThailandPDD in Preparation

CDM Services for the 26MW Hanil Cement Waste Heat Recovery Project

Hanil Cement RegistrationRepublic of Korea

At validation

CDM Services for the Dumai Biogas ProjectMeridian Sejati Surya Plantation

Registration and Off-take Agreement

IndonesiaPDD in Preparation

Daftar Proyek CDM Perenia - 610

Project Client Services Location Project Status

Advisory Services, Due Diligence and Other Projects

Methane Capture from POME for Electricity

Generation project Bell Eco Power

Monitoring and

Verification Support Malaysia At verification

Assessment of CDM Opportunities in Fiji and Samoa

NZ Ministry for the Environment

Advisory Services Fiji and Samoa Complete

CDM Eligibility Assessment of the Energy Supply and Efficiency Improvement Projects

Kenya Power and Lighting Company Limited

Advisory Services Kenya Complete

Workshop on the Kyoto Protocol and the CDMWorld Bank and Fundo de Energia (FUNAE),

Advisory Services Mozambique Complete

Baseline Study on Opportunities Under the CDMPacific Islands Forum Secretariat

Advisory Services14 Pacific Island Countries

Complete

Assessment of CDM Eligibility of Power Projects PNG Sustainable Energy Limited

Advisory Services Papua New Guinea Complete

CDM Due Diligence of a 780MW Grid Connected Natural Gas Combined Cycle Power Plant Project

Confidential Client Due Diligence China Complete

CDM Due Diligence Services for a range of greenhouse gas emission reduction projects across the iron and steel, cement, petrochemical, waste management and renewable energy generation sectors

Confidential Client Due Diligence China Complete

Emisi GRK Indonesia10

diproyeksikan akan meningkat dari 2,1 menjadi 3,3 Giga tonCO2e antara tahun 2005 sampai 2030

Sumber: Indonesia Cost Curve Abatement, NCCC

CDM sebagai peluang finansial10

• Penurunan emisi pada negara maju pada tahun 2008 – 2012 sebesarLima persen dari level emisi kolektif pada tahun 1990.

• Dapat dilakukan secara domestik atau berkolaborasi dengan negara lain.

• Bila dengan berkolaborasi dengan negara lain :

– Emissions Trading;

– Joint Implementation;

– Clean Development Mechanism;

Protokol Kyoto

CDM sebagai peluang finansial10

1990 emissions

Average emissions in

2008 – 2012Emission reduction

commitment

-5 percent below

1990 levels

(Assigned Amount)

Emission reduction

commitment

Domestic reduction

Business as Usual

Emissions

Reduction from CDM

“Certified” Emission

Reduction (CER)CER

Penurunan Emisi harus

Measurable, Reportable, Verifiable

dan additional

Negara maju Negara berkembang

Konsep dan istilah penting10

• Additionality: Pembuktian yangmenyatakan bahwa proyekpenurunan emisi ini hanyadapat dilaksanakan semata-mata karena adanya tambahanpemasukan dari CDM

• Baseline: Emisi yang terjaditanpa adanya proyek CDM

• CERs: Certified EmissionsReduction, penurunan satu tonemisi yang setara dengan satuton CO2

Tanpa proyek CDM (Baseline)

Dengan adanya proyek CDM

CER

Kredit Karbon10

adalah sebuah produk output tambahan dari modifikasi suatu “Business As Usual” menjadi

bisnis yang menghasilkan penurunan emisi

RpPendapatan

dari produksi dan

penghematan (efisiensi)

Pengembangan

Kredit Karbon Pendapatan dari

Kredit Karbon

$

Modifikasi BAU

RpPendapatan

dari produksi

“BAU”

Cara Lama

Cara CDM

Pendapatan dari CDM10

Kapasitas Terpasang EBT 10 MW

Hari Operasional 345 Hari/Tahun

Jam Operasional 24 Jam/Hari

Load Factor 75%

Pembangkitan Listrik 62,100 MWh/tahun

Faktor Emisi Grid 0.901 tCO2/MWh

Harga Jual per kWh 656 IDR/kWh

Omset Pembangkitan Listrik Rp 40,7 M /tahun

Penurunan Emisi 55,950 tCO2/tahun

Tambahan Omset dari CDM Eur 559,500 per tahun(Rp. 8 Milyar)

Sumber Daya dan Kapasitas Terpasang10

Sumber: MESDM – DJLPE 2011

• Limbah Cair

• Tandan Kosong

• Cangkang

• Fiber

Di Pabrik Kelapa Sawit10

Dahulu:

• Kolam Limbah

• Ditaruh dekat pohon

• Memadatkan jalan

Sekarang:

• Biogas

• Composting

• Biomasa

Neraca Massa :

65%

23%

7%

15%

CDM di Asia10

China51.2%

India32.2%

Vietnam3.6%

Malaysia2.8%

Thailand2.7%

Indonesia2.3%

South Korea1.7% Philippine

s1.6%

Pakistan0.6% Sri Lanka

0.5%

Others0.9%

CDM projects in Asia

0

50

100

150

200

250

300

350

400

Q1-0

4

Q3-0

4

Q1-0

5

Q3-0

5

Q1-0

6

Q3-0

6

Q1-0

7

Q3-0

7

Q1-0

8

Q3-0

8

Q1-0

9

Q3-0

9

Q1-1

0

Q3-1

0

Q1-1

1

Pro

jects

New project in Asia in the pipeline each quarter

Asia & Pacific

India

China

Contact details:

Tara F Khaira | Country Representative

Perenia Carbon - complete carbon solutionsLevel 2, NHB Building, Jalan Melawai Raya No 14, Kebayoran BaruJakarta Selatan, 12160, Indonesia

mobile +62 811 8797871email [email protected] | web www.pereniacarbon.com

Terima Kasih, ada pertanyaan?10