Networak Plan

25
Pekerjaan Persiapan Star : 01/07/09 Id : 1 Finish : 10/07/09 dur : 9 day Comp : % Pekerjaan Bongkaran Star : 01/07/09 Id : 2 Finish : 08/07/09 dur : 7 day Comp : % Pekerjaan Struktur Pekerjaan Struktur (lantai-4) Pekerjaan Struktur (lantai-5) Star : 08/07/09 Id : 3 Star : 08/07/09 Id : 4 Star : 15/08/09 Id : 5 Finish : 30/08/09 dur : 35 day Finish : 28/07/09 dur : 20 day Finish : 30/08/09 dur : 15 day Comp : % Comp : % Comp : % ekerjaan Exterior dan Interior (lantai-4 Pekerjaan Exterior Star : 30/08/09 Id : 6 Star : 30/08/09 Id : 7 Finish : 08/09/09 dur : 47 day Finish : 08/09/09 dur : 9 day Comp : % Comp : % Pekerjaan Interior Pekerjaan Partisi &dinding Pek.kusen daun pintu/jendela Pek.plafond Pek.Lantai Star : 04/09/09 Id : 8 Star : 15/09/09 Id : 9 Star : 22/09/09 Id : 10 Star : 30/09/09 Id : 11 Star : 09/10/09 Id : Finish : 13/09/09 dur : 9 day Finish : 27/09/09 dur : 12 day Finish : 01/10/09 dur : 9 day Finish : 08/10/09 dur : 8 day Finish : 27/10/09 dur : Comp : % Comp : % Comp : % Comp : % Comp : % Pek. Mekanikal dan elektrikal Kabel Utama Pekerjaan Elektrikal Pekerjaan Tata udara Pekerjaan Plumbing Pekerjaan Fire Ala Star : 21/10/09 Id : 14 Star : 19/10/09 Id : 15 Star : 24/10/09 Id : 16 Star ## 31/10/09 Id : 17 Star : 02/11/09 Id : 18 Star : 04/11/09 Id : Finish : 30/10/09 dur : 9 day Finish : 26/10/09 dur : 7 day Finish : 29/10/09 dur : 5 day Finish : 09/11/09 dur 5 9 day Finish : 11/11/09 dur : 9 day Finish : 09/11/09 dur : Comp : % Comp : % Comp : % Comp : % Comp : % Comp : % JAKARTA, 18 PT. WIJAYA PUTRA YENNY DIREKTUR NETWORK PLANNING PEKERJAAN LANJUTAN PENGEMBANGAN GEDUNG ASTA GATRA TAHAP III LEMHANNAS RI DI JL. MERDEKA SELATAN NO. 10 JAKARTA

description

rencana plan

Transcript of Networak Plan

Sheet1NETWORK PLANNING PEKERJAAN LANJUTAN PENGEMBANGAN GEDUNG ASTA GATRA TAHAP III LEMHANNAS RI DI JL. MERDEKA SELATAN NO. 10 JAKARTA

Pekerjaan PersiapanStar:01/07/09Id:1Finish:10/07/09dur:9dayComp: %Pekerjaan BongkaranStar:01/07/09Id:2Finish:08/07/09dur:7dayComp: %Pekerjaan StrukturPekerjaan Struktur (lantai-4)Pekerjaan Struktur (lantai-5)Star:08/07/09Id:3Star:08/07/09Id:4Star:15/08/09Id:5Finish:30/08/09dur:35dayFinish:28/07/09dur:20dayFinish:30/08/09dur:15dayComp: %Comp: %Comp: % Pekerjaan Exterior dan Interior (lantai-4)Pekerjaan ExteriorStar:30/08/09Id:6Star:30/08/09Id:7Finish:08/09/09dur:47dayFinish:08/09/09dur:9dayComp: %Comp: %Pekerjaan InteriorPekerjaan Partisi &dindingPek.kusen daun pintu/jendelaPek.plafondPek.LantaiPek. SanitairStar:04/09/09Id:8Star:15/09/09Id:9Star:22/09/09Id:10Star:30/09/09Id:11Star:09/10/09Id:12Star:16/10/09Id:13Finish:13/09/09dur:9dayFinish:27/09/09dur:12dayFinish:01/10/09dur:9dayFinish:08/10/09dur:8dayFinish:27/10/09dur:18dayFinish:26/10/09dur:10dayComp: %Comp: %Comp: %Comp: %Comp: %Comp: %Pek. Mekanikal dan elektrikalKabel UtamaPekerjaan ElektrikalPekerjaan Tata udaraPekerjaan PlumbingPekerjaan Fire AlarmPekerjaan sound systemStar:21/10/09Id:14Star:19/10/09Id:15Star:24/10/09Id:16Star31/10/0931/10/09Id:17Star:02/11/09Id:18Star:04/11/09Id:19Star:07/11/09Id:2Finish:30/10/09dur:9dayFinish:26/10/09dur:7dayFinish:29/10/09dur:5dayFinish:09/11/09dur59dayFinish:11/11/09dur:9dayFinish:09/11/09dur:5dayFinish:11/11/09dur:4dayComp: %Comp: %Comp: %Comp: %Comp: %Comp: %Comp: %JAKARTA, 18 Mei 2009

PT. WIJAYA PUTRA PERKASA SELARAS

YENNY KWAN DIREKTUR UTAMA

Sheet2SCHEDULE PELAKSANAAN PEKERJAAN PENGEMBANGAN GEDUNG ASTA GATRA TAHAP III LEMHANNAS RIDI JL. MERDEKA SELATAN NO. 10 JAKARTA

NOURAIAN PEKERJAANM I N G G U KEIII III IVVVIVIIVIIIIXXXIXIIXIIIXIVXVXVIKET.134567891011121314151617181920

I.PEKERJAAN PERSIAPAN{}{}{}{}{}{}{}{}{}{}{}{} II.PEKERJAAN BONGKARAN (LANTAI-4)

III.PEKERJAAN STRUKTUR A.PEKERJAAN STRUKTUR (LANTAI-4) {}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}B.PEKERJAAN STRUKTUR (LANTAI-5) {}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}

IV.PEKERJAAN EXTERIOR & INTERIOR (LANTAI 4)IV.APEK. EXTERIOR{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}IV.BPEK. INTERIORIV.B.1PEK. PARTISI & DINDING{}{}{}{}{}{}{}{}{}{}{}{}IV.B.2PEK. KUSEN, DAUN PINTU/JENDELA{}{}{}{}{}{}{}{}IV.B.3PEK. PLAFOND{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}IV.B.4PEK. LANTAI{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}IV.B.5PEK. SANITAIR{}{}{}{}{}{}{}{}{}{}{}{}

V.PEKERJAAN MEKANIKAL DAN ELEKTRIKAL (LANTAI 4)V.AKABEL UTAMA{}{}{}{}{}{}{}{}{}{}{}{}V.BPEKERJAAN ELEKTRIKAL{}{}{}{}{}{}{}{}V.CPEKERJAAN TATA UDARA{}{}{}{}{}{}{}{}{}{}{}{}V.DPEKERJAAN PLUMBING{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}V.EPEKERJAAN FIRE ALARM{}{}{}{}{}{}{}{}V.FPEKERJAAN TELEPON{}{}{}{}{}{}{}{}{}{}{}{}V.HPEKERJAAN SOUND SYSTEM{}{}{}{}{}{}{}{}{}{}{}{}V.IPEKERJAAN SPRINKLER{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}

Jakarta, 18 Mei 2008

PT. WIJAYA PUTRA PERKASA SELARAS

YENNY KWAN DIREKTUR UTAMA

Sheet3JADWAL TENAGA KERJAPEKERJAAN LANJUTAN PENGEMBANGAN GEDUNG ASTA GATRA TAHAP IIILEMHANNAS RIJl. Merdeka Selatan Jakarta PusatJANGKA WAKTU PELAKSANAAN 120 HARI KALENDER

BULAN KE IBULAN KE IIBULAN KE IIIBULAN KE IV NO.URAIAN PEKERJAANMINGGU KE KET.12345678910111213141516

1Pekerja / Kenek================================================================================2Kepala Tukang Batu===========================================================================3Tukang Batu===========================================================================4Kepala Tukang Kayu================================================================================5Tukang Kayu================================================================================6Kepala Tukang Cat===================================7Tukang Cat===================================8Tukang Instalator=========================9Pembantu instalator=========================10Kepala Tukang Pasang Pipa=========================11Tukang Pasang Pipa=========================12Mandor / Pengawas================================================================================

Jakarta, 18 Mei 2008 PT. WIJAYA PUTRA PERKASA SELARAS YENNY KWAN DIREKTUR UTAMA

Sheet4JADWAL PENGGUNAAN /PENGADAAN MATERIALPEKERJAAN PENGEMBANGAN LANJUTAN GEDUNG ASTA GATRA TAHAP IIILEMHANNAS RIJL. MERDEKA SELATAN NO. 10 JAKARTA

BULAN KE IBULAN KE IIBULAN KE IIIBULAN KE IV No.Jenis Bahan Bangunan SatuanMINGGU KE KET.12345678910111213141516

1AC Split WALL 1 PK/ unit{}{}{}{}{}{}2AC Split WALL 1,5 PK/ unit{}{}{}{}{}{}3AC Split WALL 2 PK/ unit{}{}{}{}{}{}4Acrylic susu tebal = 5mm/ lbr{}{}{}{}{}{}5Gypsum tile 600mm x 120mm/ lbr6Akustik Panel 600mm x 120mm/ lbr{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}7AM grout : AM 50 Coloured Ceramic Grout pengisi celah nat ubin/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}8Bata merah/ bh{}{}{}{}{}{}{}{}{}{}{}{}9Bekesting berat pada plat beton bertulang (bahan DKI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}10Bekesting beton jepit, sloof, ringbalk (bahan DKI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}11Bekesting balok beton bertulang, exposed tripleks tebal 15mm (bahan DKI) / m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}12Beton Readymix K.350/ m3{}{}{}{}{}{}13Beton dengan koral beton, adukan 1PC : 2psr : 3krl (rata-rata harga DKI dengan SNI)/ m3{}{}{}14Cat Tembok Luar 3 lapis dengan sealer (bahan rata-rata DKI & SNI)/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}15Conduit Corugated (pipa kabel) 20mm2/ btg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}16Cornice adhesive @20kg/ zak{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}17Ceiling Speaker 6W biege/ set{}{}{}{}{}{}{}{}{}18Clamp, lasdop, saddle, fitting, paku, dll (untuk instalasi penerangan)/ ls{}{}{}{}{}{}19Closet duduk CW 867 NJ (Colour)lengkap aceesories/ set{}{}{}{}{}{}20Direksi Keet uk. 4m x 6m = 24m2 atap seng gelombang, tebal 0,25mm, kaca nako lengkap 1 set kursi/meubel sederhana/ m2{}{}{}{}{}{}21Double tape kaca/ roll{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}22Engsel pintu nylon 3" x 4"/ bh23Floor drain TX1BV1 / TX1BN/ bh{}{}{}{}{}{}24Foto proyek tiga phase color (36 asa 200)/ set{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}25Fisher + sekrup/ bh{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}26Frame pintu/jendela aluminium natural/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}27Grendel Tanam 6"/ bh{}{}{}{}{}{}28Grendel Tanam 12"/ bh{}{}{}29Gypsumboard 4' x 8' x 9mm/ Lbr{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}30Head Sprinkler/ bh{}{}{}{}{}{}31Hollow 40x40x0,4mm @400 dimeni/ btg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}32Hollow 20x40x0,4mm @400 dimeni/ btg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}33Junction box 3 ways/ bh{}{}{}{}{}{}{}{}{}34Kabel NYM 2 x 1,5mm2 ; SNI 04-02699/SPLN 42-2 IEC ; 300/500V{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}35Kabel NYM 3 x 2,5mm2 ; SNI 04-02699/SPLN 42-2 IEC ; 300/500V/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}36Kabel NYM 3 x 4mm2 ; SNI 04-02699/SPLN 42-2 IEC ; 300/500V/ m137Kabel NYFGbY 4 x 150mm2; SNI 04-02700/SPLN 43-2 IEC 60502-1; 0,6kV/1kV/ m1{}{}{}{}{}{}{}{}{}38Kabel NYY 4 x 6mm2; SNI 04-02701/SPLN 43-1 IEC 60502-1; 0,6kV/1kV/ m1{}{}{}{}{}{}{}{}{}39Kabel NYY 4 x 10mm2; SNI 04-02701/SPLN 43-1 IEC 60502-1; 0,6kV/1kV/ m1{}{}{}{}{}{}{}{}{}40Kabel NYA 2 x 2,5mm2/ m1{}{}{}{}{}{}41Kaca cermin 5mm/ m2{}{}{}{}{}{}42Kaca clear 5mm/ m2{}{}{}43Kaca clear 6mm warna/ m2{}{}{}44Kalsiboard Panel 1200mm x 2400mm / lbr{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}45Karet List/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}46Kayu BORNEO Basah 4cm x 6cm x 400cm/ m3{}{}{}{}{}{}{}{}{}{}{}{}47Kayu BORNEO Kering 4cm x 6cm x 400cm/ m3{}{}{}{}{}{}{}{}{}{}{}{}48Kayu KAMPER SAMARINDA Oven/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}49Keramik Lantai 40cm x 40cm (harga rata-rata bahan sesuai DKI & SNI)/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}50Keramik Lantai 30cm x 60cm (1 duz = 6keping)/ bh{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}51Keramik Lantai 30cm x 30cm (harga rata-rata bahan sesuai DKI & SNI)/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}52Keramik Lantai 30cm x 60cm (1 duz = 6keping)/ bh{}{}{}{}{}{}{}{}{}{}{}{}53Keramik Lantai 8cm x 30cm/ bh{}{}{}{}{}{}54Kran tembok kepala besi T 23 B 13/ bh{}{}{}{}{}{}{}{}{}{}{}{}55Kusen Aluminium natural 3" x 1 1/2"/ m1{}{}{}{}{}{}{}{}{}{}{}{}56Lampu RM.2 - 300 ; 2 x 36watt/ set{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}57Lampu Downlght RD 150 E27 + PLE 18watt/ set{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}58Lampu Baret Square 20watt/ set59Lampu TL-balok 1x36watt/ set60Lem/perekat Putih/ kg{}{}{}61Lem/perekat Kuning/ kg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}62List W 24x10x19x3050 (mm)/ btg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}63Lockset/ set{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}64Main Tee 360cm/ btg{}{}{}{}{}{}{}{}{}{}{}{}65Cross Tee 120cm/ btg{}{}{}{}{}{}66Cross Tee 60cm/ btg{}{}{}{}{}{}{}{}{}{}{}{}67MCCB 3 phase ; 125-160A ; 36kA (NS160N) MG/ bh{}{}{}{}{}{}{}{}{}{}{}{}68MCCB 3 phase ; 200-250A ; 36kA (NS250N)/ bh{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}69MCB 1 phase ; 10A ; 8kA (NC45N)/ bh{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}70MCB 1 phase ; 6A ; 8kA (NC45N)/ bh{}{}{}{}{}{}71MCB 1 phase ; 16A ; 8kA (NC45N)/ bh{}{}{}{}{}{}72Melaminto uk. 4' x 8' x 3mm - doff/ lbr{}{}{}73Melamic kusen pintu/jendela/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}74Melamic edging 2cm x 3cm/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}75Melamic daun pintu/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}76Melamic parapet l=20cm/ m1{}{}{}{}{}{}{}{}{}77Melapis meni pada permukaan baja/besi/ m2{}{}{}78Pagar sementara seng gelombang tebal 0,20mm tinggi 180cm, pondasi ukuran 40cm x 40cm x 40cm adukan 1PC : 3psr : 5krl/ m1{}{}{}{}{}{}{}{}{}{}{}{}79Paku segala ukuran (rata-rata)/ kg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}80Paku biasa uk. 5, 7, & 10cm / kg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}81Papan nama proyek bahan multiplek 8mm uk. 240cm x 120cm/ buah{}{}{}84Pasir Pasang/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}85Pembesian untuk 1 m3 beton dengan berat 75kg besi polos (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}86Pembesian untuk 1 m3 beton dengan berat 125kg besi polos (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}87Pembesian untuk 1 m3 beton dengan berat 250kg besi polos (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}88Pembesian untuk 1 m3 beton dengan berat 150kg besL ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}89Pembesian untuk 1 m3 beton dengan berat 200kg besi ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}90Pembesian untuk 1 m3 beton dengan berat 225kg besi ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}91Pembesian untuk 1 m3 beton dengan berat 250kg besi ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}92Pembesian untuk 1 m3 beton dengan berat 300kg besi ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}93Pembesian untuk 1 m3 beton dengan berat 325kg besi ULIR (rata-rata harga DKI dengan SNI)/ m3{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}94Pengukuran dan pemasangan bouwplank/ m1{}{}{}{}{}{}{}{}{}95Penyekat Urinal type A100 (W & PIV) lengkap acessories/ set{}{}{}{}{}{}{}{}{}96Pintu teakwood & formika rangka kayu kamper samarinda/ m2{}{}{}{}{}{}{}{}{}97Pintu double tripleks lapis formika rangka kayu kamper singkil/ m2{}{}{}{}{}{}{}{}{}98Pipa HITAM medium dia. 1"/ btg{}{}{}{}{}{}99Pipa PUTIH medium dia. 1"/ btg{}{}{}100Pipa PUTIH medium dia. 3/4"/ btg{}{}{}101Pipa PUTIH medium dia. 1/2"/ btg{}{}{}{}{}{}102Pipa PVC-AW dia. 6"/ btg{}{}{}103Pipa PVC-AW dia. 4"/ btg{}{}{}104Pipa PVC-AW dia. 3"/ btg{}{}{}105Pipa PVC-AW dia. 2"/ btg{}{}{}{}{}{}{}{}{}106Plakban/Isolasi untuk protektsi lantai existing/ roll{}{}{}{}{}{}{}{}{}107Plint aluminium natural t=10cm/ m1{}{}{}{}{}{}{}{}{}108Prestressed balok beton PC-1/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}109Prestressed balok beton PC-2 / CP-3/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}110Rangka komposite panel/cladding/curtainwall ; hollow/frame aluminium berikut bracket dan accessories lainnya/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}111Rod penggantung plafond berikut ajuster dan mur/ btg{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}112Saklar Engkel ex. Lokal/ bh113Saklar Series ex. Lokal/ bh114Screeding (= plesteran tebal 3cm) adukan 1PC : 5psr/ m2{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}115Sealant/ m1{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}116Seal Tape/ bh{}{}{}{}{}{}{}{}{}{}{}{}117Sekrup gypsum/ bh{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}118Semen PC @50kg/ zak{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}{}119Sticker Film/ m2{}{}{}{}{}{}{}{}{}{}{}{}120Stop Kontak ex. Lokal/ bh{}{}{}{}{}{}{}{}{}121Stop Kontak AC/ bh{}{}{}{}{}{}{}{}{}122Teakwood uk. 4' x 8' x 3mm/ lbr{}{}{}123Tempat Tissue/Kertas/ bh{}{}{}{}{}{}{}{}{}124Textile Tape @90m (plester)/ roll125Tripleks ukuran 120cm x 240cm x 4mm/ lbr{}{}{}{}{}{}{}{}{}126Tripleks ukuran 4' x 8' x 9mm/ lbr{}{}{}{}{}{}127Tripleks ukuran 3' x 7' x 12mm/ lbr{}{}{}{}{}{}128Tripleks ukuran 4' x 8' x 12mm/ lbr{}{}{}129Tripleks ukuran 4' x 8' x 15mm/ lbr{}{}{}130Tripleks ukuran 4' x 8' x 18mm/ lbr{}{}{}131Urinal U 57 M (W & PIV) lengkap acessories/ set{}{}{}{}{}{}

132Horizontal blind/ m2{}{}{}{}{}{}133Wallpaper kualitas standard/lokal/ m2{}{}{}{}{}{}{}{}{}134Wallpaper kualitas sedang/import/ m2{}{}{}{}{}{}135Wall washer TGB 500 AZRV20/ unit{}{}{}136Wastafel LW860CJ lengkap acessories/ set{}{}{}137Waterproofing Cementinous (cairan+serbuk) 3 kali coating/ m2{}{}{}{}{}{}138Indicator lamp (lengkap acessories)/ buah{}{}{}

Jakarta, 18 Mei 2008 PT. WIJAYA PUTRA PERKASA SELARAS YENNY KWAN DIREKTUR UTAMA